Sample records for waste pipeline unplugging

  1. Design Improvements and Analysis of Innovative High-Level Waste Pipeline Unplugging Technologies - 12171

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pribanic, Tomas; Awwad, Amer; Crespo, Jairo

    2012-07-01

    Transferring high-level waste (HLW) between storage tanks or to treatment facilities is a common practice performed at the Department of Energy (DoE) sites. Changes in the chemical and/or physical properties of the HLW slurry during the transfer process may lead to the formation of blockages inside the pipelines resulting in schedule delays and increased costs. To improve DoE's capabilities in the event of a pipeline plugging incident, FIU has continued to develop two novel unplugging technologies: an asynchronous pulsing system and a peristaltic crawler. The asynchronous pulsing system uses a hydraulic pulse generator to create pressure disturbances at two oppositemore » inlet locations of the pipeline to dislodge blockages by attacking the plug from both sides remotely. The peristaltic crawler is a pneumatic/hydraulic operated crawler that propels itself by a sequence of pressurization/depressurization of cavities (inner tubes). The crawler includes a frontal attachment that has a hydraulically powered unplugging tool. In this paper, details of the asynchronous pulsing system's ability to unplug a pipeline on a small-scale test-bed and results from the experimental testing of the second generation peristaltic crawler are provided. The paper concludes with future improvements for the third generation crawler and a recommended path forward for the asynchronous pulsing testing. (authors)« less

  2. Design Optimization of Innovative High-Level Waste Pipeline Unplugging Technologies - 13341

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pribanic, T.; Awwad, A.; Varona, J.

    2013-07-01

    Florida International University (FIU) is currently working on the development and optimization of two innovative pipeline unplugging methods: the asynchronous pulsing system (APS) and the peristaltic crawler system (PCS). Experiments were conducted on the APS to determine how air in the pipeline influences the system's performance as well as determine the effectiveness of air mitigation techniques in a pipeline. The results obtained during the experimental phase of the project, including data from pipeline pressure pulse tests along with air bubble compression tests are presented. Single-cycle pulse amplification caused by a fast-acting cylinder piston pump in 21.8, 30.5, and 43.6 mmore » pipelines were evaluated. Experiments were conducted on fully flooded pipelines as well as pipelines that contained various amounts of air to evaluate the system's performance when air is present in the pipeline. Also presented are details of the improvements implemented to the third generation crawler system (PCS). The improvements include the redesign of the rims of the unit to accommodate a camera system that provides visual feedback of the conditions inside the pipeline. Visual feedback allows the crawler to be used as a pipeline unplugging and inspection tool. Tests conducted previously demonstrated a significant reduction of the crawler speed with increasing length of tether. Current improvements include the positioning of a pneumatic valve manifold system that is located in close proximity to the crawler, rendering tether length independent of crawler speed. Additional improvements to increase the crawler's speed were also investigated and presented. Descriptions of the test beds, which were designed to emulate possible scenarios present on the Department of Energy (DOE) pipelines, are presented. Finally, conclusions and recommendations for the systems are provided. (authors)« less

  3. Improved third generation peristaltic crawler for removal of high-level waste plugs in United States department of energy Hanford site pipelines

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vazquez, Gabriela; Pribanic, Tomas

    2013-07-01

    There are approximately 56 million gallons (212 km{sup 3}) of high level waste (HLW) at the U.S. Department of Energy (DOE) Hanford Site. It is scheduled that by the year 2040, the HLW is to be completely transferred to secure double-shell tanks (DST) from the leaking single-tanks (SST) via transfer pipeline system. Blockages have formed inside the pipes during transport because of the variety in composition and characteristics of the waste. These full and partial plugs delay waste transfers and require manual intervention to repair, therefore are extremely expensive, consuming millions of dollars and further threatening the environment. To successfullymore » continue the transfer of waste through the pipelines, DOE site engineers are in need of a technology that can accurately locate the blockages and unplug the pipelines. In this study, the proposed solution to remediate blockages formed in pipelines is the use of a peristaltic crawler: a pneumatically/hydraulically operated device that propels itself in a worm-like motion through sequential fluctuations of pressure in its air cavities. The crawler is also equipped with a high-pressure water nozzle used to clear blockages inside the pipelines. The crawler is now in its third generation. Previous generations showed limitations in its durability, speed, and maneuverability. Latest improvements include an automation of sequence that prevents kickback, a front-mounted inspection camera for visual feedback, and a thinner wall outer bellow for improved maneuverability. Different experimental tests were conducted to evaluate the improvements of crawler relative to its predecessors using a pipeline test-bed assembly. Anchor force tests, unplugging tests, and fatigue testing for both the bellow and rubber rims have yet to be conducted and thus results are not presented in this research. Experiments tested bellow force and response, cornering maneuverability, and straight line navigational speed. The design concept and experimental test results are reported. (authors)« less

  4. HEMISPHERIC CENTER FOR ENVIRONMENTAL TECHNOLOGY

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    M.A. Ebadian

    1999-07-31

    FIU-HCET personnel visited the Special Technologies Laboratory (STL) for discussions with the Principal Investigator (PI) of Laser Induced Fluorescence Imaging (LIFI) and for training in LIFI. Mr. Peter Gibbons, Tanks Retrieval Technology Integration Manager, visited FIU-HCET on July 20, 1999. Mr. Gibbons inspected the pipeline unplugging experimental facility at the HCET testing field. The detailed test bed construction, testing plan, and plugging material specifications were discussed.

  5. 24 CFR 3280.612 - Tests and inspection.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... leaks. Then the system shall be unplugged and emptied. The waste piping above the level of the water... water and checking for leaks and retarded flow while they are being emptied. (d) Shower compartments... and inspection. (a) Water system. All water piping in the water distribution system shall be subjected...

  6. Oil and Gas Wells and Pipelines on U.S. Wildlife Refuges: Challenges for Managers

    PubMed Central

    2015-01-01

    The increased demand for oil and gas places a burden on lands set aside for natural resource conservation. Oil and gas development alters the environment locally and on a much broader spatial scale depending on the intensity and extent of mineral resource extraction. The current increase in oil and gas exploration and production in the United States prompted an update of the number of pipelines and wells associated with oil and gas production on National Wildlife Refuge System (NWRS) lands. We obtained geospatial data on the location of oil and gas wells and pipelines within and close to the boundaries of NWRS lands (units) acquired as fee simple (i.e. absolute title to the surface land) by the U.S. Fish and Wildlife Service. We found that 5,002 wells are located in 107 NWRS units and 595 pipelines transect 149 of the 599 NWRS units. Almost half of the wells (2,196) were inactive, one-third (1,665) were active, and the remainder of the wells were either plugged and abandoned or the status was unknown. Pipelines crossed a total of 2,155 kilometers (1,339 miles) of NWRS fee simple lands. The high level of oil and gas activity warrants follow up assessments for wells lacking information on production type or well status with emphasis on verifying the well status and identifying abandoned and unplugged wells. NWRS fee simple lands should also be assessed for impacts from brine, oil and other hydrocarbon spills, as well as habitat alteration associated with oil and gas, including the identification of abandoned oil and gas facilities requiring equipment removal and site restoration. PMID:25915417

  7. "Unplugged": A New European School Programme against Substance Abuse

    ERIC Educational Resources Information Center

    Kreeft, Peer Van Der; Wiborg, Gudrun; Galanti, Maria Rosaria; Siliquini, Roberta; Bohrn, Karl; Scatigna, Maria; Lindahl, Ann-Marie; Melero, Juan Carlos; Vassara, Maro; Faggiano, Fabrizio

    2009-01-01

    This paper presents the rationale, development and application of "Unplugged', a new school programme for the prevention of substance abuse, which is based on the comprehensive social influence approach (CSI). The programme was developed, implemented and evaluated by a cross-disciplinary group of experts in the frame of a multi-centre study…

  8. CS Unplugged and Middle-School Students' Views, Attitudes, and Intentions regarding CS

    ERIC Educational Resources Information Center

    Taub, Rivka; Armoni, Michal; Ben-Ari, Mordechai

    2012-01-01

    Many students hold incorrect ideas and negative attitudes about computer science (CS). In order to address these difficulties, a series of learning activities called Computer Science Unplugged was developed by Tim Bell and his colleagues. These activities expose young people to central concepts in CS in an entertaining way without requiring a…

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Washenfelder, D. J.; Girardot, C. L.; Wilson, E. R.

    The twenty-eight double-shell underground radioactive waste storage tanks at the U. S. Department of Energy’s Hanford Site near Richland, WA are interconnected by the Waste Transfer System network of buried steel encased pipelines and pipe jumpers in below-grade pits. The pipeline material is stainless steel or carbon steel in 51 mm to 152 mm (2 in. to 6 in.) sizes. The pipelines carry slurries ranging up to 20 volume percent solids and supernatants with less than one volume percent solids at velocities necessary to prevent settling. The pipelines, installed between 1976 and 2011, were originally intended to last until themore » 2028 completion of the double-shell tank storage mission. The mission has been subsequently extended. In 2010 the Tank Operating Contractor began a systematic evaluation of the Waste Transfer System pipeline conditions applying guidelines from API 579-1/ASME FFS-1 (2007), Fitness-For-Service. Between 2010 and 2014 Fitness-for-Service examinations of the Waste Transfer System pipeline materials, sizes, and components were completed. In parallel, waste throughput histories were prepared allowing side-by-side pipeline wall thinning rate comparisons between carbon and stainless steel, slurries and supernatants and throughput volumes. The work showed that for transfer volumes up to 6.1E+05 m 3 (161 million gallons), the highest throughput of any pipeline segment examined, there has been no detectable wall thinning in either stainless or carbon steel pipeline material regardless of waste fluid characteristics or throughput. The paper describes the field and laboratory evaluation methods used for the Fitness-for-Service examinations, the results of the examinations, and the data reduction methodologies used to support Hanford Waste Transfer System pipeline wall thinning conclusions.« less

  10. "Unplugged," a European School-Based Program for Substance Use Prevention among Adolescents: Overview of Results from the EU-Dap Trial

    ERIC Educational Resources Information Center

    Vigna-Taglianti, Federica D.; Galanti, Maria Rosaria; Burkhart, Gregor; Caria, Maria Paola; Vadrucci, Serena; Faggiano, Fabrizio

    2014-01-01

    The EU-Dap study aimed to develop and evaluate a school-based curriculum for the prevention of substance use among young people. The school curriculum, "Unplugged," is based on social influence approach and addresses social and personal skills, knowledge, and normative beliefs. It consists of 12 one-hour interactive sessions delivered by…

  11. Laboratory tests for assessing adaptability and stickiness of dental composites.

    PubMed

    Rosentritt, Martin; Buczovsky, Sebastian; Behr, Michael; Preis, Verena

    2014-09-01

    Handling (stickiness, adaptability) of a dental composite does strongly influence quality and success of a dental restoration. The purpose was to develop an in vitro test, which allows for evaluating adaptability and stickiness. 15 dentists were asked for providing individual assessment (school scores 1-6) of five dental composites addressing adaptability and stickiness. Composites were applied with a dental plugger (d=1.8 mm) in a class I cavity (human tooth 17). The tooth was fixed on a force gauge for simultaneous determination of application forces with varying storage (6/25°C) and application temperatures (6/25°C). On basis of these data tensile tests were performed with a dental plugger (application force 1N/2N; v=35 mm/min) on PMMA- or human tooth plates. Composite was dosed onto the tip of the plugger and applied. Application and unplugging was performed once and unplugging forces (UF) and length of the adhesive flags (LAF) were determined at different storage (6/25°C) and application temperatures (25/37°C). Unplugging work (UW) was calculated from area of UF and LAF data. The individual assessment revealed significantly different temperature-dependent application forces between 0.58 N and 2.23 N. Adaptability was assessed between 2.1 and 2.8 school scores. Stickiness varied significantly between the materials (scores: 2-3.2). UW differed significantly between the materials with values between 3.20 N mm and 37.83 N mm. Between PMMA substrate or tooth slides and between 1N or 2N application force only small UW differences were found. The presented in vitro unplugging work allows for an in vitro estimation of the handling parameters adaptability and stickiness. Copyright © 2014 Academy of Dental Materials. Published by Elsevier Ltd. All rights reserved.

  12. Feasibility Studies on Pipeline Disposal of Concentrated Copper Tailings Slurry for Waste Minimization

    NASA Astrophysics Data System (ADS)

    Senapati, Pradipta Kumar; Mishra, Barada Kanta

    2017-06-01

    The conventional lean phase copper tailings slurry disposal systems create pollution all around the disposal area through seepage and flooding of waste slurry water. In order to reduce water consumption and minimize pollution, the pipeline disposal of these waste slurries at high solids concentrations may be considered as a viable option. The paper presents the rheological and pipeline flow characteristics of copper tailings samples in the solids concentration range of 65-72 % by weight. The tailings slurry indicated non-Newtonian behaviour at these solids concentrations and the rheological data were best fitted by Bingham plastic model. The influence of solids concentration on yield stress and plastic viscosity for the copper tailings samples were discussed. Using a high concentration test loop, pipeline experiments were conducted in a 50 mm nominal bore (NB) pipe by varying the pipe flow velocity from 1.5 to 3.5 m/s. A non-Newtonian Bingham plastic pressure drop model predicted the experimental data reasonably well for the concentrated tailings slurry. The pressure drop model was used for higher size pipes and the operating conditions for pipeline disposal of concentrated copper tailings slurry in a 200 mm NB pipe with respect to specific power consumption were discussed.

  13. Remaining Sites Verification Package for the 100-F-26:12, 1.8-m (72-in.) Main Process Sewer Pipeline, Waste Site Reclassification Form 2007-034

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    J. M. Capron

    2008-04-29

    The 100-F-26:12 waste site was an approximately 308-m-long, 1.8-m-diameter east-west-trending reinforced concrete pipe that joined the North Process Sewer Pipelines (100-F-26:1) and the South Process Pipelines (100-F-26:4) with the 1.8-m reactor cooling water effluent pipeline (100-F-19). In accordance with this evaluation, the verification sampling results support a reclassification of this site to Interim Closed Out. The results of verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River.

  14. Remaining Sites Verification Package for the 100-F-44:2, Discovery Pipeline Near 108-F Building, Waste Site Reclassification Form 2007-006

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    J. M. Capron

    2008-05-30

    The 100-F-44:2 waste site is a steel pipeline that was discovered in a junction box during confirmatory sampling of the 100-F-26:4 pipeline from December 2004 through January 2005. The 100-F-44:2 pipeline feeds into the 100-F-26:4 subsite vitrified clay pipe (VCP) process sewer pipeline from the 108-F Biology Laboratory at the junction box. In accordance with this evaluation, the confirmatory sampling results support a reclassification of this site to No Action. The current site conditions achieve the remedial action objectives and the corresponding remedial action goals established in the Remaining Sites ROD. The results of confirmatory sampling show that residual contaminantmore » concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River.« less

  15. Pipeline transport and simultaneous saccharification of corn stover.

    PubMed

    Kumar, Amit; Cameron, Jay B; Flynn, Peter C

    2005-05-01

    Pipeline transport of corn stover delivered by truck from the field is evaluated against a range of truck transport costs. Corn stover transported by pipeline at 20% solids concentration (wet basis) or higher could directly enter an ethanol fermentation plant, and hence the investment in the pipeline inlet end processing facilities displaces comparable investment in the plant. At 20% solids, pipeline transport of corn stover costs less than trucking at capacities in excess of 1.4 M drytonnes/yr when compared to a mid range of truck transport cost (excluding any credit for economies of scale achieved in the ethanol fermentation plant from larger scale due to multiple pipelines). Pipelining of corn stover gives the opportunity to conduct simultaneous transport and saccharification (STS). If current enzymes are used, this would require elevated temperature. Heating of the slurry for STS, which in a fermentation plant is achieved from waste heat, is a significant cost element (more than 5 cents/l of ethanol) if done at the pipeline inlet unless waste heat is available, for example from an electric power plant located adjacent to the pipeline inlet. Heat loss in a 1.26 m pipeline carrying 2 M drytonnes/yr is about 5 degrees C at a distance of 400 km in typical prairie clay soils, and would not likely require insulation; smaller pipelines or different soil conditions might require insulation for STS. Saccharification in the pipeline would reduce the need for investment in the fermentation plant, saving about 0.2 cents/l of ethanol. Transport of corn stover in multiple pipelines offers the opportunity to develop a large ethanol fermentation plant, avoiding some of the diseconomies of scale that arise from smaller plants whose capacities are limited by issues of truck congestion.

  16. Remaining Sites Verification Package for the 100-F-26:13, 108-F Drain Pipelines, Waste Site Reclassification Form 2005-011

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    L. M. Dittmer

    2008-03-03

    The 100-F-26:13 waste site is the network of process sewer pipelines that received effluent from the 108-F Biological Laboratory and discharged it to the 188-F Ash Disposal Area (126-F-1 waste site). The pipelines included one 0.15-m (6-in.)-, two 0.2-m (8-in.)-, and one 0.31-m (12-in.)-diameter vitrified clay pipe segments encased in concrete. In accordance with this evaluation, the verification sampling results support a reclassification of this site to Interim Closed Out. The results of verification sampling demonstrated that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also showed thatmore » residual contaminant concentrations are protective of groundwater and the Columbia River.« less

  17. Standby Power

    Science.gov Websites

    being unplugged. These products draw power 24 hours a day, often without the knowledge of the consumer Define & Measure Data Reports & Links Archives Contact © Building Technology and Urban Systems

  18. Remaining Sites Verification Package for the 100-F-26:15 Miscellaneous Pipelines Associated with the 132-F-6, 1608-F Waste Water Pumping Station, Waste Site Reclassification Form 2007-031

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    L. M. Dittmer

    2008-03-18

    The 100-F-26:15 waste site consisted of the remnant portions of underground process effluent and floor drain pipelines that originated at the 105-F Reactor. In accordance with this evaluation, the verification sampling results support a reclassification of this site to Interim Closed Out. The results of verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River.

  19. Baby unplugged: a novel, market-based approach to reducing screen time and promoting healthy alternatives.

    PubMed

    Hutton, John S

    2013-01-01

    The issue of electronic media use by young children is increasingly important in pediatrics, a major risk factor for numerous chronic conditions. Despite guidelines in place since 1999, screen time is on the rise, aided by new formats removing practically all barriers of use. Key drivers are technological allure, confusion about developmental readiness, and perception of educational value, fueled by potent marketing. This article describes the development of Baby Unplugged, a series of children's board books celebrating "old-school," screen-free childhood. Written by a pediatrician who also owns a children's bookstore, the books were inspired and informed by advocacy projects in the areas of media use and early literacy as a pediatric resident. They reinforce AAP Electronic Media Guidelines, notably discouraging screen-based media under 2 years old, largely by encouraging healthy, fun alternatives. Examples include Pets, Book, and Yard. Multi-sensorial exploration and parent-child engagement are emphasized in a non-prescriptive way, featuring gender and ethnic diversity and activities that are accessible and inexpensive. The author describes challenges faced by pediatricians providing anticipatory guidance for media use, given limited time and resources and the perception that we are out of touch. This is heightened by oft-deceptive marketing of screen-based products more likely to be perceived as "cool." Reach Out and Read is cited as an example of a successful, "cool" intervention, though limited to select populations. Baby Unplugged takes advocacy to the marketplace, where the screen time battle is being lost.

  20. The application of magnetic gradiometry and electromagnetic induction at a former radioactive waste disposal site.

    PubMed

    Rucker, Dale Franklin

    2010-04-01

    A former radioactive waste disposal site is surveyed with two non-intrusive geophysical techniques, including magnetic gradiometry and electromagnetic induction. Data were gathered over the site by towing the geophysical equipment mounted to a non-electrically conductive and non-magnetic fibre-glass cart. Magnetic gradiometry, which detects the location of ferromagnetic material, including iron and steel, was used to map the existence of a previously unknown buried pipeline formerly used in the delivery of liquid waste to a number of surface disposal trenches and concrete vaults. The existence of a possible pipeline is reinforced by historical engineering drawing and photographs. The electromagnetic induction (EMI) technique was used to map areas of high and low electrical conductivity, which coincide with the magnetic gradiometry data. The EMI also provided information on areas of high electrical conductivity unrelated to a pipeline network. Both data sets demonstrate the usefulness of surface geophysical surveillance techniques to minimize the risk of exposure in the event of future remediation efforts.

  1. A Comparison between the Decimated Padé Approximant and Decimated Signal Diagonalization Methods for Leak Detection in Pipelines Equipped with Pressure Sensors.

    PubMed

    Lay-Ekuakille, Aimé; Fabbiano, Laura; Vacca, Gaetano; Kitoko, Joël Kidiamboko; Kulapa, Patrice Bibala; Telesca, Vito

    2018-06-04

    Pipelines conveying fluids are considered strategic infrastructures to be protected and maintained. They generally serve for transportation of important fluids such as drinkable water, waste water, oil, gas, chemicals, etc. Monitoring and continuous testing, especially on-line, are necessary to assess the condition of pipelines. The paper presents findings related to a comparison between two spectral response algorithms based on the decimated signal diagonalization (DSD) and decimated Padé approximant (DPA) techniques that allow to one to process signals delivered by pressure sensors mounted on an experimental pipeline.

  2. Beyond Web-Based Training: Learning Unplugged.

    ERIC Educational Resources Information Center

    Gayeski, Diane M.

    2002-01-01

    Discussion of corporate training focuses on the Internet, Web-based training, and the latest trend toward wireless technology. Topics include the emerging workplace, including continuous learning and collaboration and aiding performance; mobile delivery systems for corporate instructional designers; and types of mobile devices, including PDAs…

  3. 49 CFR 172.205 - Hazardous waste manifest.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Hazardous waste manifest. 172.205 Section 172.205 Transportation Other Regulations Relating to Transportation PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION HAZARDOUS MATERIALS REGULATIONS HAZARDOUS MATERIALS TABLE, SPECIAL PROVISIONS, HAZARDOUS MATERIALS...

  4. Music Education Unplugged

    ERIC Educational Resources Information Center

    Bates, Vincent C.

    2013-01-01

    The author of this article proposes an agrarian vision of music education that underscores fundamental, "down-to-earth" principles for human actions and interactions. An agrarian world-view encourages mass participation ("y'all come")--"musicing" is free and available to all and it is not treated as a…

  5. The theoretical model of the school-based prevention programme Unplugged.

    PubMed

    Vadrucci, Serena; Vigna-Taglianti, Federica D; van der Kreeft, Peer; Vassara, Maro; Scatigna, Maria; Faggiano, Fabrizio; Burkhart, Gregor

    2016-12-01

    Unplugged is a school-based prevention programme designed and tested in the EU-Dap trial. The programme consists of 12 units delivered by class teachers to adolescents 12-14 years old. It is a strongly interactive programme including a training of personal and social skills with a specific focus on normative beliefs. The aim of this work is to define the theoretical model of the program, the contribution of the theories to the units, and the targeted mediators. The programme integrates several theories: Social Learning, Social Norms, Health Belief, theory of Reasoned Action-Attitude, and Problem Behaviour theory. Every theory contributes to the development of the units' contents, with specific weights. Knowledge, risk perception, attitudes towards drugs, normative beliefs, critical and creative thinking, relationship skills, communication skills, assertiveness, refusal skills, ability to manage emotions and to cope with stress, empathy, problem solving and decision making skills are the targeted mediators of the program. © The Author(s) 2015.

  6. Flavor Crystals as Brain Food: Unplug TV Commercials in School.

    ERIC Educational Resources Information Center

    Fox, Roy F.

    1997-01-01

    Classic propaganda techniques (repetition, testimonials, transfers of one quality to another, and painstaking imagery) work best in "closed" environments--exactly the situation advertisers have in Channel-One classrooms. Private, vulnerable, and sacred, the human psyche is not a commodity to be sold. Yet, such commerce will continue…

  7. The new idea of transporting tailings-logs in tailings slurry pipeline and the innovation of technology of mining waste-fill method

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lin Yu; Wang Fuji; Tao Yan

    2000-07-01

    This paper introduced a new idea of transporting mine tailings-logs in mine tailings-slurry pipeline and a new technology of mine cemented filing of tailings-logs with tailings-slurry. The hydraulic principles, the compaction of tailings-logs and the mechanic function of fillbody of tailings-logs cemented by tailings-slurry have been discussed.

  8. Learning Unplugged: Using Mobile Technologies for Organizational Training and Performance Improvement.

    ERIC Educational Resources Information Center

    Gayeski, Diane

    This book, which is written by a training consultant, is intended to help organizations determine whether specific readily available mobile technologies make sense for their particular learning and performance needs. Chapter 1 discusses the mobile revolution in learning and performance, with special attention to the new work and learning…

  9. Speleothems and Sand Castles

    ERIC Educational Resources Information Center

    Hance, Trevor; Befus, Kevin

    2015-01-01

    The idea of building sand castles evokes images of lazy summer days at the beach, listening to waves crash, enjoying salty breezes, and just unplugging for a while to let our inner child explore the wonderful natural toys beneath our feet. The idea of exploring caves might evoke feelings and images of claustrophobia or pioneers and Native…

  10. The visual and radiological inspection of a pipeline using a teleoperated pipe crawler

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fogle, R.F.; Kuelske, K.; Kellner, R.A.

    1996-07-01

    In the 1950s the Savannah River Site built an open, unlined retention basin for temporary storage of potentially radionuclide-contaminated cooling water form a chemical separations process and storm water drainage from a nearby waste management facility which stored large quantities of nuclear fission by-products in carbon steel tanks. An underground process pipeline lead to the basin. Once the closure of the basin in 1972, further assessment has been required. A visual and radiological inspection of the pipeline was necessary to aid in the decision about further remediation. This article describes the inspection using a teleoperated pipe crawler. 5 figs.

  11. Comte Unplugged: Using a "Technology Fast" to Teach Sociological Theory

    ERIC Educational Resources Information Center

    Hoop, Katrina C.

    2012-01-01

    Sociology majors learn that sociological theory is foundational to our field; it frames the way we look at the world and provides guiding questions for our social inquiry. But sociology instructors know that teaching theory is a challenge. A number of activities have been created to engage students in sociological theory courses. This note…

  12. The Quick Quiz: An Unplugged Assessment for the Math Educator's Toolbox

    ERIC Educational Resources Information Center

    Jones, Julie P.; Bradley, Gary; Love, Sarah

    2018-01-01

    When implemented correctly, feedback from assessments can result in students reflecting and rethinking their mathematics, while increasing their effort and motivation. This article explores a formative assessment technique for use in the first few minutes of each class. Readers will find out how they can use the QuickQuiz (QQ) to drive…

  13. Robot vs. Human Teacher: Instruction in the Digital Age for ESL Learners

    ERIC Educational Resources Information Center

    Kwok, Virginia H. Y.

    2015-01-01

    Living in the twenty-first century, life unplugged seems impossible without the Internet, mobile phones, i-products or other types of electronic gadgets for long. While language educators are overwhelmingly occupied with investigating the impact of computers and mobile learning, here is a call to address the value of face-to-face instruction in…

  14. Games Unplugged! "Dolanan Anak," Traditional Javanese Children's Singing Games in the 21st-Century General Music Classroom

    ERIC Educational Resources Information Center

    Wang, Jui-Ching

    2015-01-01

    Educated in a digital world, millennial children lack social interaction and actual hands-on activities involving tactile and kinesthetic training. To counteract this educational trend, traditional singing games that allow children to explore and make sense of their world physically can be valuable. This article introduces the traditional Javanese…

  15. The "Unplugged" Project

    ERIC Educational Resources Information Center

    Bjorklund, Wendy L.; Rehling, Diana L.; Tompkins, Paula S.; Strom, Renee E.

    2012-01-01

    Most of today's college students live in a world in which they are connected "24/7" (i.e. 24 hours a day, 7 days a week). Unlike their professors, students are true "digital natives." Young Americans spend more than seven and a half hours a day with some sort of electronic device, and because most of them are multitasking with those devices, "they…

  16. High-Level Waste System Process Interface Description

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    d'Entremont, P.D.

    1999-01-14

    The High-Level Waste System is a set of six different processes interconnected by pipelines. These processes function as one large treatment plant that receives, stores, and treats high-level wastes from various generators at SRS and converts them into forms suitable for final disposal. The three major forms are borosilicate glass, which will be eventually disposed of in a Federal Repository, Saltstone to be buried on site, and treated water effluent that is released to the environment.

  17. 125. ARAI Contaminated waste storage tank (ARA729). Shows location of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    125. ARA-I Contaminated waste storage tank (ARA-729). Shows location of tank on the ARA-I site, section views, connecting pipeline, and other details. Norman Engineering Company 961-area/SF-301-3. Date: January 1959. Ineel index code no. 068-0301-00-613-102711. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID

  18. Renewable Natural Gas Clean-up Challenges and Applications

    DTIC Science & Technology

    2011-01-13

    produced from digesters ─ Animal manure (dairy cows, swine) ─ Waste water treatment facilities > Methane from Landfills > RNG produced from...AGR used in process • Two stage + trim methanation reactor • Dehydration to achieve gas pipeline specifications ~ 70% conversion efficiency 21... digestion of agricultural waste for on-site electricity generation ─Altamont Landfill—Landfill gas (LFG) cleanup for production of liquefied natural gas

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carter, E.E.; Welty, B.D.

    Molten wax shows considerable promise as a fixative and dust control agent in demolition of radioactively contaminated facilities. Sticky molten wax, modified with special surfactants and wetting agents, is capable of not only coating materials but also penetrating into friable or dusty materials and making them incapable of becoming airborne during demolition. Wax also shows significant promise for stabilization of waste residuals that may be contained in buildings undergoing demolition. Some of the building materials that have been tested to date include concrete, wood, sheet rock, fiber insulation, lime, rock, and paper. Protective clothing, clay, sand, sulfur, and bentonite claymore » have been tested as surrogates for certain waste materials that may be encountered during building demolition. The paper describes several potential applications of molten wax for dust control in demolition of radioactive contaminated facilities. As a case-study, this paper describes a research test performed for a pipeline closure project being completed by the Idaho Cleanup Project at the Idaho National Laboratory. The project plans to excavate and remove a section of buried Duriron drain piping containing highly radioactive and friable and 'flighty' waste residuals. A full-scale pipeline mockup containing simulated waste was buried in sand to simulate the direct buried subsurface condition of the subject piping. The pipeline was pre-heated by drawing hot air through the line with a HEPA vacuum blower unit. Molten wax was pumped into the line and allowed to cool. The line was then broken apart in various places to evaluate the permeation performance of the wax. The wax fully permeated all the surrogate materials rendering them non-friable with a consistency similar to modeling clay. Based on the performance during the mockup, it is anticipated that the wax will be highly effective in controlling the spread of radiological contamination during pipe demolition activities. (authors)« less

  20. Unplugged Cybersecurity: An Approach for Bringing Computer Science into the Classroom

    ERIC Educational Resources Information Center

    Fees, Rachel E.; da Rosa, Jennifer A.; Durkin, Sarah S.; Murray, Mark M.; Moran, Angela L.

    2018-01-01

    The United States Naval Academy (USNA) STEM Center for Education and Outreach addresses an urgent Navy and national need for more young people to pursue careers in STEM fields through world-wide outreach to 17,000 students and 900 teachers per year. To achieve this mission, the STEM Center has developed a hands-on and inquiry-based methodology to…

  1. Student Use of Technology in Class: Engaged or Unplugged?

    ERIC Educational Resources Information Center

    La Roche, Claire R.; Flanigan, Mary A.

    2013-01-01

    In recent years, there has been a great deal of discussion about the need for student engagement and a meaningful connection in the classroom. With the advent of cell phones, computers and the Internet, students are more connected to, and, at the same time, more disconnected from each other than ever before. We are living in the age of exponential…

  2. Connecting for High Potential... "Here Comes Summer." CHP Issue 27

    ERIC Educational Resources Information Center

    Danielian, Jeff; Nilles, Kathleen

    2015-01-01

    Summer vacation is right around the corner! However, just as quickly as summer approaches, it also passes in the blink of an eye. This time of year, both parents and teachers face the same dilemma: Should high-ability kids stay busy with summer projects, courses, sports, camps, and travel...or should they be allowed to completely unplug with no…

  3. Debunking the Myth-tery: How the New AASL Standards Unplugged Mythology

    ERIC Educational Resources Information Center

    Hubbard, Erin E.

    2009-01-01

    Though few students realize it, many things in today's culture exist because of mythology. This article argues that library media specialists and teachers can teach mythology but it must be applied to the 21st century and shown its relevance in today's world. The article demonstrates that mythology studies are alive and well when the new AASL…

  4. U-PLANT GEOGRAPHIC ZONE CLEANUP PROTOTYPE

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ROMINE, L.D.

    2006-02-01

    The U Plant geographic zone (UPZ) occupies 0.83 square kilometers on the Hanford Site Central Plateau (200 Area). It encompasses the U Plant canyon (221-U Facility), ancillary facilities that supported the canyon, soil waste sites, and underground pipelines. The UPZ cleanup initiative coordinates the cleanup of the major facilities, ancillary facilities, waste sites, and contaminated pipelines (collectively identified as ''cleanup items'') within the geographic zone. The UPZ was selected as a geographic cleanup zone prototype for resolving regulatory, technical, and stakeholder issues and demonstrating cleanup methods for several reasons: most of the area is inactive, sufficient characterization information is availablemore » to support decisions, cleanup of the high-risk waste sites will help protect the groundwater, and the zone contains a representative cross-section of the types of cleanup actions that will be required in other geographic zones. The UPZ cleanup demonstrates the first of 22 integrated zone cleanup actions on the Hanford Site Central Plateau to address threats to groundwater, the environment, and human health. The UPZ contains more than 100 individual cleanup items. Cleanup actions in the zone will be undertaken using multiple regulatory processes and decision documents. Cleanup actions will include building demolition, waste site and pipeline excavation, and the construction of multiple, large engineered barriers. In some cases, different cleanup actions may be taken at item locations that are immediately adjacent to each other. The cleanup planning and field activities for each cleanup item must be undertaken in a coordinated and cohesive manner to ensure effective execution of the UPZ cleanup initiative. The UPZ zone cleanup implementation plan (ZCIP) was developed to address the need for a fundamental integration tool for UPZ cleanup. As UPZ cleanup planning and implementation moves forward, the ZCIP is intended to be a living document that will provide a focal point for integrating UPZ actions, including field cleanup activities, waste staging and handling, and post-cleanup monitoring and institutional controls.« less

  5. Composition and Properties of Deposits Formed on the Internal Surface of Oil Pipelines

    NASA Astrophysics Data System (ADS)

    Gulieva, N. K.; Mustafaev, I. I.; Sabzaliev, A. A.; Garibov, R. G.

    2018-03-01

    The composition and physicochemical properties of oil deposits formed in pipelines during the transport of oil from Azerbaijani fields were studied by atomic absorption, chromatography-mass spectrometry, gamma spectrometry, and scanning electron microscopy methods. Up to 20% of the deposits were shown to be composed of paraffins, tars, and other heavy oil fractions, while asphaltenes and mechanical impurities (iron, sulfur, manganese, calcium, and silicon compounds) comprise about 80%. The contents of polycyclic aromatic hydrocarbons and radionuclides are within permissible levels, while the content of some heavy metals exceeds the permissible level by a factor of 1000. These data should be used in the management of waste products in petroleum pipelines.

  6. Leak detection in gas pipeline by acoustic and signal processing - A review

    NASA Astrophysics Data System (ADS)

    Adnan, N. F.; Ghazali, M. F.; Amin, M. M.; Hamat, A. M. A.

    2015-12-01

    The pipeline system is the most important part in media transport in order to deliver fluid to another station. The weak maintenance and poor safety will contribute to financial losses in term of fluid waste and environmental impacts. There are many classifications of techniques to make it easier to show their specific method and application. This paper's discussion about gas leak detection in pipeline system using acoustic method will be presented in this paper. The wave propagation in the pipeline is a key parameter in acoustic method when the leak occurs and the pressure balance of the pipe will generated by the friction between wall in the pipe. The signal processing is used to decompose the raw signal and show in time- frequency. Findings based on the acoustic method can be used for comparative study in the future. Acoustic signal and HHT is the best method to detect leak in gas pipelines. More experiments and simulation need to be carried out to get the fast result of leaking and estimation of their location.

  7. "Unplugging" as Real and Metaphoric: Emancipatory Dimensions to "The Matrix" Film Trilogy. Technical Paper No. 33

    ERIC Educational Resources Information Center

    Fisher, R. Michael

    2009-01-01

    This paper is a reflection, on the 10th anniversary of a great work of art. After reviewing some of the global impacts of the Wachowski brothers' highly acclaimed action sci-fi film "The Matrix" (1999-2003), I present a case for the use of the film in critical theory and pedagogy and it's apparent un-interest to such theorists and pedagogues.…

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carter, E.E.

    Molten wax shows considerable promise as a fixative and dust control agent in demolition of radioactively contaminated facilities. Sticky molten wax, modified with special surfactants and wetting agents, is capable of not only coating materials but also penetrating into friable or dusty materials and making them incapable of becoming airborne during demolition. Wax also shows significant promise for stabilization of waste residuals that may be contained in buildings undergoing demolition. Some of the building materials that have been tested to date include concrete, wood, sheet-rock, fiber insulation, lime, rock, and paper. Protective clothing, clay, sand, sulfur, and bentonite clay havemore » been tested as surrogates for certain waste materials that may be encountered during building demolition. The paper describes several potential applications of molten wax for dust control in demolition of radioactive contaminated facilities. As a case-study, this paper describes a research test performed for a pipeline closure project being completed by the Idaho Cleanup Project at the Idaho National Laboratory. The project plans to excavate and remove a section of buried Duriron drain piping containing highly radioactive and friable and 'flighty' waste residuals. A full-scale pipeline mockup containing simulated waste was buried in sand to simulate the direct-buried subsurface condition of the subject piping. The pipeline was pre-heated by drawing hot air through the line with a HEPA vacuum blower unit. Molten wax was pumped into the line and allowed to cool. The line was then broken apart in various places to evaluate the permeation performance of the wax. The wax fully permeated all the surrogate materials rendering them non-friable with a consistency similar to modeling clay. Based on the performance during the mockup, it is anticipated that the wax will be highly effective in controlling the spread of radiological contamination during pipe demolition activities. A larger test was completed this year to simulate the work in more realistic conditions. (authors)« less

  9. Hydraulic accumulator-compressor for geopressured enhanced oil recovery

    DOEpatents

    Goldsberry, Fred L.

    1988-01-01

    A hydraulic accumulator-compressor vessel using geothermal brine under pressure as a piston to compress waste (CO.sub.2 rich) gas is used in a system having a plurality of gas separators in tandem to recover pipeline quality gas from geothermal brine. A first high pressure separator feeds gas to a membrance separator which separates low pressure waste gas from high pressure quality gas. A second separator produces low pressure waste gas. Waste gas from both separators is combined and fed into the vessel through a port at the top as the vessel is drained for another compression cycle. High pressure brine is then admitted into the vessel through a port at the bottom of the vessel. Check valves control the flow of low pressure waste gas into the vessel and high pressure waste gas out of the vessel.

  10. The visual and radiological inspection of a pipeline using a teleoperated pipe crawler

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fogle, R.F.; Kuelske, K.; Kellner, R.

    1995-01-01

    In the 1950s, the Savannah River Site built an open, unlined retention basin to temporarily store potentially radionuclide contaminated cooling water from a chemical separations process and storm water drainage from a nearby waste management facility that stored large quantities of nuclear fission byproducts in carbon steel tanks. The retention basin was retired from service in 1972 when a new, lined basin was completed. In 1978, the old retention basin was excavated, backfilled with uncontaminated dirt, and covered with grass. At the same time, much of the underground process pipeline leading to the basin was abandoned. Since the closure ofmore » the retention basin, new environmental regulations require that the basin undergo further assessment to determine whether additional remediation is required. A visual and radiological inspection of the pipeline was necessary to aid in the remediation decision making process for the retention basin system. A teleoperated pipe crawler inspection system was developed to survey the abandoned sections of underground pipelines leading to the retired retention basin. This paper will describe the background to this project, the scope of the investigation, the equipment requirements, and the results of the pipeline inspection.« less

  11. The inspection of a radiologically contaminated pipeline using a teleoperated pipe crawler

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fogle, R.F.; Kuelske, K.; Kellner, R.A.

    1995-08-01

    In the 1950s, the Savannah River Site built an open, unlined retention basin to temporarily store potentially radionuclide contaminated cooling water from a chemical separations process and storm water drainage from a nearby waste management facility that stored large quantities of nuclear fission byproducts in carbon steel tanks. The retention basin was retired from service in 1972 when a new, lined basin was completed. In 1978, the old retention basin was excavated, backfilled with uncontaminated dirt, and covered with grass. At the same time, much of the underground process pipeline leading to the basin was abandoned. Since the closure ofmore » the retention basin, new environmental regulations require that the basin undergo further assessment to determine whether additional remediation is required. A visual and radiological inspection of the pipeline was necessary to aid in the remediation decision making process for the retention basin system. A teleoperated pipe crawler inspection system was developed to survey the abandoned sections of underground pipelines leading to the retired retention basin. This paper will describe the background to this project, the scope of the investigation, the equipment requirements, and the results of the pipeline inspection.« less

  12. Herbivore-induced callose deposition on the sieve plates of rice: an important mechanism for host resistance.

    PubMed

    Hao, Peiying; Liu, Caixiang; Wang, Yuanyuan; Chen, Rongzhi; Tang, Ming; Du, Bo; Zhu, Lili; He, Guangcun

    2008-04-01

    The brown planthopper (Nilaparvata lugens Stål; BPH) is a specialist herbivore on rice (Oryza sativa) that ingests phloem sap from the plant through its stylet mouthparts. Electronic penetration graphs revealed that BPH insects spent more time wandering over plants carrying the resistance genes Bph14 and Bph15, but less time ingesting phloem than they did on susceptible plants. They also showed that their feeding was frequently interrupted. Tests with [(14)C]sucrose showed that insects ingested much less phloem sap from the resistant than the susceptible plants. BPH feeding up-regulated callose synthase genes and induced callose deposition in the sieve tubes at the point where the stylet was inserted. The compact callose remained intact in the resistant plants, but genes encoding beta-1,3-glucanases were activated, causing unplugging of the sieve tube occlusions in susceptible plants. Continuing ingestion led to a remarkable reduction in the susceptible plants' sucrose content and activation of the RAmy3D gene, leading to starch hydrolysis and ultimately carbohydrate deprivation in the plants. Our results demonstrate that BPH feeding induces the deposition of callose on sieve plates in rice and that this is an important defense mechanism that prevents insects from ingesting phloem sap. In response, however, the BPH can unplug sieve tube occlusions by activating beta-1,3-glucanase genes in rice plants.

  13. Construction integrity assessment report (ETN-98-0005) S-Farm overground transfer (OGT) system valve pit 241-S-B to valve pit 241-S-D

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    HICKS, D.F.

    1999-08-12

    The S-Farm overground transfer (OGT) line will bypass the existing line(s), between valve pits 241-S-B and 241-S-D that no longer meet system requirements. The new OGT line will provide a waste transfer pipeline between these valve pits in support of saltwell pumping activities. The length of the OGT line is approximately 180 ft from pit to pit. The primary pipe is nominal 1-in. diameter stainless steel (SST) braided Ethylene-propylene Diene Monomer (EPDM) hose. The encasement pipe is a nominal 3-in., flanged, SST pipe made up of several different length pipe spool pieces (drawing H-2-829564, sh. 1 and sh. 2). Themore » OGT line slopes from valve pit 241-S-B toward valve pit 241-S-D. At each end, the primary and encasement pipe connect to a pit entry spool piece. The pit entry spool pieces are constructed of prefabricated SST materials. These spool pieces allow for the separation of the primary and encasement pipelines after the pipes have entered the valve pits (drawing H-2-818280, sh. 2). The pit entry spool pieces also allow for leak detection of the encasement pipe at each end (drawing H-2-829564, sh. 2). The OGT encasement pipeline is supported above ground by adjustable height unistrut brackets and precast concrete bases (drawing H-2-829654, sh. 1). The pipeline is heat-traced and insulated. The heat tracing and insulation supply and retain latent heat that prevents waste solidification during transfers and provides freeze protection. The total length of the pipeline is above ground, thereby negating the need for cathodic corrosion protection. This Construction Integrity Assessment Report (CIAR) is prepared by Fluor Daniel Northwest for Numatec Hanford Corporation/Lockheed Martin Hanford Corporation, the operations contractor, and the U. S. Department of Energy, the system owner. The CIAR is intended to verify that construction was performed in accordance with the provisions of Washington Administrative Code, WAC-173-303-640 (3) (c), (e), (f) and (h).« less

  14. 78 FR 41853 - Safety Advisory Guidance: Heating Rail Tank Cars To Prepare Hazardous Material for Unloading or...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-12

    ... rail tank car due to chemical self-reaction and expansion of the toluene diisocyanate matter wastes. On...: Cheryl West Freeman, Division of Engineering and Research, Pipeline and Hazardous Materials Safety... catastrophically ruptured at a transfer station at the BASF Corporation chemical facility in Freeport, Texas. The...

  15. Environmental Support Specialist, Blocks VI & VII, 17-7. Military Curriculum Materials for Vocational and Technical Education.

    ERIC Educational Resources Information Center

    Ohio State Univ., Columbus. National Center for Research in Vocational Education.

    This military-developed text contains the final section of a four-part course to train environmental support specialists. Covered in the individual course blocks are maintenance of water and waste processing system components (external corrosion control, cathodic protection, drive equipment, pipelines and valves, meters and recorders, chemical…

  16. Alternative Fuels Data Center: Hydrogenation-Derived Renewable Diesel

    Science.gov Websites

    rapeseed oil; animal tallow; vegetable oil waste or brown trap grease; and other fats and vegetable oils new pipelines, storage tanks, or retail station pumps), can be produced using existing oil refinery manufacturers-including ConocoPhillips, Neste Oil, Petrobras, REG, and UOP-are developing and testing HDRD

  17. Short-term mediating factors of a school-based intervention to prevent youth substance use in Europe.

    PubMed

    Giannotta, Fabrizia; Vigna-Taglianti, Federica; Rosaria Galanti, Maria; Scatigna, Maria; Faggiano, Fabrizio

    2014-05-01

    To investigate factors mediating the effects of a European school-based intervention (Unplugged) based on a social influence approach to youths' substance use. Schools in seven European countries (n = 143, including 7,079 pupils) were randomly assigned to an experimental condition (Unplugged curriculum) or a control condition (usual health education). Data were collected before (pretest) and 3 months after the end of the program (posttest). Multilevel multiple mediation models were applied to the study of effect mediation separately for tobacco, alcohol, and cannabis use. Analyses were conducted on the whole sample, and separately on baseline users and nonusers of each substance. Compared with the control group, participants in the program endorsed less positive attitudes toward drugs; positive beliefs about cigarettes, alcohol, and cannabis; and the normative perception of peers using tobacco and cannabis. They also increased in knowledge about all substances and refusal skills toward tobacco. Decreased positive attitudes toward drugs, increase in refusal skills, and reappraisal of norms about peer using tobacco and cannabis appeared to mediate the effects of the program on the use of substances. However, mediating effects were generally weak and some of them were only marginally significant. This study lends some support to the notion that school-based programs based on a social influence model may prevent juvenile substance use through the modification of attitudes, refusal skills, and normative perceptions. Copyright © 2014 Society for Adolescent Health and Medicine. Published by Elsevier Inc. All rights reserved.

  18. Geophysical investigation of 216-U-8 clay vitrified pipe transfer line, 200 West Area

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bergstrom, K.A.

    1994-12-05

    Two geophysical surveys were conducted over a vitrified clay pipeline (VCP) that was used to transfer liquid radioactive waste from the 224-U Building to the 216-U-8 and 216-U-12 cribs. The objectives of the surveys were to locate the VCP in the northern site, locate the bends in the VCP in the southern site, and locate possible utilities or pipelines at both sites. Ground-penetrating radar (GPR) was the method chosen for the surveys. Electromagnetic induction (EMI) was also used at the southern site to map the extent of a possible pipeline. It is very difficult to detect most VCPs with GPR,more » however, excavation boundaries for the pipeline are often discernible. The VCP was not identified in the GPR data at the northern site. Its anticipated depth was 10--12 ft. The VCP at the southern site appears to be much shallower. The data suggest it may be 5 ft or less below the surface in places. The edges of the excavation from N100 to N190 are between E120 and E135 and were quite distinct in the data. However, the excavation boundaries weren`t apparent north of N190, suggesting that the VCP bends to the north near N200. Several profiles were extended beyond N200. These profiles detected a linear, with the characteristic signature of a pipeline, approximately 3 ft below the surface. There was no previous knowledge of the pipeline. The linear was traced across the entire surface contamination area with an EMI geophysical tool.« less

  19. Wasting Talent: Using Counter-Storytelling to Narrate Dismal Educational Outcomes

    ERIC Educational Resources Information Center

    Gonzalez, Martín Alberto

    2018-01-01

    A recent study illustrated that the educational attainment of Latina/o students has been dismal during the past decade and that many Latinas/os continue to "fall through the cracks" of the educational pipeline. Through storytelling, I juxtapose my educational trajectory as a high school graduate with that of my third-oldest brother, who…

  20. Assessment of Tank 241-S-112 Liquid Waste Mixing in Tank 241-SY-101

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Onishi, Yasuo; Trent, Donald S.; Wells, Beric E.

    The objectives of this study were to evaluate mixing of liquid waste from Tank 241-S-112 with waste in Tank 241-SY-101 and to determine the properties of the resulting waste for the cross-site transfer to avoid potential double-shell tank corrosion and pipeline plugging. We applied the time-varying, three-dimensional computer code TEMPEST to Tank SY-101 as it received the S-112 liquid waste. The model predicts that temperature variations in Tank SY-101 generate a natural convection flow that is very slow, varying from about 7 x 10{sup -5} to 1 x 10{sup -3} ft/sec (0.3 to about 4 ft/hr) in most areas. Thus,more » natural convection would eventually mix the liquid waste in SY-101 but would be very slow to achieve nearly complete mixing. These simulations indicate that the mixing of S-112 and SY-101 wastes in Tank SY-101 is a very slow process, and the density difference between the two wastes would further limit mixing. It is expected to take days or weeks to achieve relatively complete mixing in Tank SY-101.« less

  1. Remedial Investigation Report on the Abandoned Nitric Acid Pipeline at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Energy Systems Environmental Restoration Program; Y-12 Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-02-01

    Upper East Fork Poplar Creek Operable Unit 2 consists of the Abandoned Nitric Acid pipeline (ANAP). This pipeline was installed in 1951 to transport liquid wastes {approximately}4800 ft from Buildings 9212, 9215, and 9206 to the S-3 Ponds. Materials known to have been discharged through the pipeline include nitric acid, depleted and enriched uranium, various metal nitrates, salts, and lead skimmings. During the mid-1980s, sections of the pipeline were removed during various construction projects. A total of 19 locations were chosen to be investigated along the pipeline for the first phase of this Remedial Investigation. Sampling consisted of drilling downmore » to obtain a soil sample at a depth immediately below the pipeline. Additional samples were obtained deeper in the subsurface depending upon the depth of the pipeline, the depth of the water table, and the point of auger refusal. The 19 samples collected below the pipeline were analyzed by the Oak Ridge Y-12 Plant`s laboratory for metals, nitrate/nitrite, and isotopic uranium. Samples collected from three boreholes were also analyzed for volatile organic compounds because these samples produced a response with organic vapor monitoring equipment. Uranium activities in the soil samples ranged from 0.53 to 13.0 pCi/g for {sup 238}U, from 0.075 to 0.75 pCi/g for {sup 235}U, and from 0.71 to 5.0 pCi/g for {sup 238}U. Maximum total values for lead, chromium, and nickel were 75.1 mg/kg, 56.3 mg/kg, and 53.0 mg/kg, respectively. The maximum nitrate/nitrite value detected was 32.0 mg-N/kg. One sample obtained adjacent to a sewer line contained various organic compounds, at least some of which were tentatively identified as fragrance chemicals commonly associated with soaps and cleaning solutions. The results of the baseline human health risk assessment for the ANAP contaminants of potential concern show no unacceptable risks to human health.« less

  2. Healthcare waste management research: A structured analysis and review (2005-2014).

    PubMed

    Thakur, Vikas; Ramesh, A

    2015-10-01

    The importance of healthcare waste management in preserving the environment and protecting the public cannot be denied. Past research has dealt with various issues in healthcare waste management and disposal, which spreads over various journals, pipeline research disciplines and research communities. Hence, this article analyses this scattered knowledge in a systematic manner, considering the period between January 2005 and July 2014. The purpose of this study is to: (i) identify the trends in healthcare waste management literature regarding journals published; (ii) main topics of research in healthcare waste management; (iii) methodologies used in healthcare waste management research; (iv) areas most frequently researched by researchers; and (v) determine the scope of future research in healthcare waste management. To this end, the authors conducted a systematic review of 176 articles on healthcare waste management taken from the following eight esteemed journals: International Journal of Environmental Health Research, International Journal of Healthcare Quality Assurance, Journal of Environmental Management, Journal of Hazardous Material, Journal of Material Cycles and Waste Management, Resources, Conservations and Recycling, Waste Management, and Waste Management & Research. The authors have applied both quantitative and qualitative approaches for analysis, and results will be useful in the following ways: (i) results will show importance of healthcare waste management in healthcare operations; (ii) findings will give a comparative view of the various publications; (c) study will shed light on future research areas. © The Author(s) 2015.

  3. Remaining Sites Verification Package for the 100-F-26:10, 1607-F3 Sanitary Sewer Pipelines (182-F, 183-F, and 151-F Sanitary Sewer Lines), Waste Site Reclassification Form 2007-028

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    L. M. Dittmer

    2007-12-03

    The 100-F-26:10 waste site includes sanitary sewer lines that serviced the former 182-F, 183-F, and 151-F Buildings. In accordance with this evaluation, the verification sampling results support a reclassification of this site to Interim Closed Out. The results of verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River.

  4. Emerald oil field on production in North Sea

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-08-31

    This paper reports that Midland and Scottish Energy Ltd. (MSE) has placed Emerald oil field on stream in the U.K. North Sea with a floating production unit. Initial production, from two satellite wells, will be used to commission facilities. Three water injection wells have been unplugged and are ready for start-up. MSE will place a central cluster of wells-five producers and one water injector-on stream during the next few weeks. Production will build to an expected 25,000 b/d from 35 million bbl of reserves. Field development has undergone an unusually large number of setbacks and changes.

  5. Public Water Supply, Red River Parish, Louisiana.

    DTIC Science & Technology

    1981-03-01

    overpumpage with resultant salt Infiltration. Health officials in the parish have com- plained about the poor quality of well water. (See letter from Dr...However, the effect of solid waste and sewage resulting from Grand Bayou Reservoir user activities can be minimized through State Board of Health ...quality and the associated public health hazards. (1-b) Possible complaints from land owners against land acquisition for pipeline right-of-way. (1-c

  6. The impact of changes in the rheological parameters of fine-grained hydromixtures on the efficiency of a selected industrial gravitational hydraulic transport system

    NASA Astrophysics Data System (ADS)

    Popczyk, Marcin

    2017-11-01

    Polish hard coal mines commonly use hydromixtures in their fire prevention practices. The mixtures are usually prepared based on mass-produced power production wastes, namely the ashes resulting from power production [1]. Such hydromixtures are introduced to the caving area which is formed due to the advancement of a longwall. The first part of the article presents theoretical fundamentals of determining the parameters of gravitational hydraulic transport of water and ash hydromixtures used in the mining pipeline systems. Each hydromixture produced based on fine-grained wastes is characterized by specified rheological parameters that have a direct impact on the future flow parameters of a given pipeline system. Additionally, the gravitational character of the hydraulic transport generates certain limitations concerning the so-called correct hydraulic profile of the system in relation to the applied hydromixture characterized by required rheological parameters that should ensure safe flow at a correct efficiency [2]. The paper includes an example of a gravitational hydraulic transport system and an assessment of the correctness of its hydraulic profile as well as the assessment of the impact of rheological parameters of fine-grained hydromixtures (water and ash) produced based on laboratory tests, depending on the specified flow parameters (efficiency) of the hydromixture in the analyzed system.

  7. Electromagnetic pulse (EMP), Part II: Field-expedient ways to minimize its effects on field medical treatment facilities.

    PubMed

    Vandre, R H; Klebers, J; Tesche, F M; Blanchard, J P

    1993-05-01

    Part I of this paper showed that a field commander can expect approximately 65% of his unprotected electronic medical equipment to be damaged by the electromagnetic pulse (EMP) from a single nuclear detonation as far as 2200 km away. Using computer modeling, field-expedient ways to minimize the effects of EMP were studied. The results were: (1) keep wiring near the ground, (2) keep wiring short, (3) unplug unused equipment, (4) run power cabling and tents in a magnetic north-south direction (avoid running power cabling in the east-west direction), and (5) place sensitive equipment in International Organization for Standardization shelters.

  8. A comparative study on per capita waste generation according to a waste collecting system in Korea.

    PubMed

    Oh, Jung Hwan; Lee, Eui-Jong; Oh, Jeong Ik; Kim, Jong-Oh; Jang, Am

    2016-04-01

    As cities are becoming increasingly aware of problems related to conventional mobile collection systems, automated pipeline-based vacuum collection (AVAC) systems have been introduced in some densely populated urban areas. The reasons are that in addition to cost savings, AVAC systems can be efficient, hygienic, and environmentally friendly. Despite difficulties in making direct comparisons of municipal waste between a conventional mobile collection system and an AVAC system, it is meaningful to measure the quantities in each of these collection methods either in total or on a per capita generation of waste (PCGW, g/(day*capita)) basis. Thus, the aim of this study was to assess the difference in per capita generation of household waste according to the different waste collection methods in Korea. Observations on household waste show that there were considerable differences according to waste collection methods. The value of per capita generation of food waste (PCGF) indicates that a person in a city using AVAC produces 60 % of PCGF (109.58 g/(day*capita)), on average, compared with that of a truck system (173.10 g/(day*capita)) as well as 23 %p less moisture component than that with trucks. The value of per capita generation of general waste (PCGG) in a city with an AVAC system showed 147.73 g/(day*capita), which is 20 % less than that with trucks delivered (185 g/(day*capita)). However, general waste sampled from AVAC showed a 35 %p increased moisture content versus truck delivery.

  9. Engineering study of 50 miscellaneous inactive underground radioactive waste tanks located at the Hanford Site, Washington

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Freeman-Pollard, J.R.

    1994-03-02

    This engineering study addresses 50 inactive underground radioactive waste tanks. The tanks were formerly used for the following functions associated with plutonium and uranium separations and waste management activities in the 200 East and 200 West Areas of the Hanford Site: settling solids prior to disposal of supernatant in cribs and a reverse well; neutralizing acidic process wastes prior to crib disposal; receipt and processing of single-shell tank (SST) waste for uranium recovery operations; catch tanks to collect water that intruded into diversion boxes and transfer pipeline encasements and any leakage that occurred during waste transfer operations; and waste handlingmore » and process experimentation. Most of these tanks have not been in use for many years. Several projects have, been planned and implemented since the 1970`s and through 1985 to remove waste and interim isolate or interim stabilize many of the tanks. Some tanks have been filled with grout within the past several years. Responsibility for final closure and/or remediation of these tanks is currently assigned to several programs including Tank Waste Remediation Systems (TWRS), Environmental Restoration and Remedial Action (ERRA), and Decommissioning and Resource Conservation and Recovery Act (RCRA) Closure (D&RCP). Some are under facility landlord responsibility for maintenance and surveillance (i.e. Plutonium Uranium Extraction [PUREX]). However, most of the tanks are not currently included in any active monitoring or surveillance program.« less

  10. Evaluating the Air Quality, Climate and Economic Impacts of ...

    EPA Pesticide Factsheets

    Anaerobic digestion is a natural biological process in which microorganisms break down organic materials in the absence of oxygen. When anaerobic microbes metabolize organic waste – i.e., the carbon-based remains of plants, animals and their waste products, e.g. animal manure, sewage sludge and food waste – they produce biogas. Biogas consists mainly of methane and carbon dioxide and can be used as a renewable energy fuel in a variety of applications. The impacts of biogas generation and utilization processes differ, depending on the source material (e.g., sewage, manure, food processing waste, municipal solid waste) and end uses (e.g., on-site electricity generation, conversion to a vehicle fuel, injection into the natural gas pipeline, etc.). Organic waste managers and regulators alike lack sufficient information about the overall environmental and economic performance of available biogas management technologies. A more complete understanding of the environmental and economic performance of biogas-to-energy technologies will assist state and local governments, regulators, and potential project developers in identifying geographically appropriate and cost-effective biogas management options.The backdrop for this research was California. The state has unique air quality challenges due to the combination of meteorology and topography, population growth and the pollution burden associated with mobile sources. However, with the strengthening of National Ambient

  11. The artificial water cycle: emergy analysis of waste water treatment.

    PubMed

    Bastianoni, Simone; Fugaro, Laura; Principi, Ilaria; Rosini, Marco

    2003-04-01

    The artificial water cycle can be divided into the phases of water capture from the environment, potabilisation, distribution, waste water collection, waste water treatment and discharge back into the environment. The terminal phase of this cycle, from waste water collection to discharge into the environment, was assessed by emergy analysis. Emergy is the quantity of solar energy needed directly or indirectly to provide a product or energy flow in a given process. The emergy flow attributed to a process is therefore an index of the past and present environmental cost to support it. Six municipalities on the western side of the province of Bologna were analysed. Waste water collection is managed by the municipal councils and treatment is carried out in plants managed by a service company. Waste water collection was analysed by compiling a mass balance of the sewer system serving the six municipalities, including construction materials and sand for laying the pipelines. Emergy analysis of the water treatment plants was also carried out. The results show that the great quantity of emergy required to treat a gram of water is largely due to input of non renewable fossil fuels. As found in our previous analysis of the first part of the cycle, treatment is likewise characterised by high expenditure of non renewable resources, indicating a correlation with energy flows.

  12. High altitude mine waste remediation -- Implementation of the Idarado remedial action plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hardy, A.J.; Redmond, J.V.; River, R.A.

    1999-07-01

    The Idarado Mine in Colorado's San Juan Mountains includes 11 tailing areas, numerous waste rock dumps, and a large number of underground openings connected by over 100 miles of raises and drifts. The tailings and mine wastes were generated from different mining and milling operations between 1975 and 1978. the Idarado Remedial Action Plan (RAP) was an innovative 5-year program developed for remediating the impacts of historic mining activities in the San Miguel River and Red Mountain Creek drainages. The challenges during implementation included seasonal access limitations due to the high altitude construction areas, high volumes of runoff during snowmore » melt, numerous abandoned underground openings and stopped-out veins, and high profile sites adjacent to busy jeep trails and a major ski resort town. Implementation of the RAP has included pioneering efforts in engineering design and construction of remedial measures. Innovative engineering designs included direct revegetation techniques for the stabilization of tailings piles, concrete cutoff walls and French drains to control subsurface flows, underground water controls that included pipelines, weeplines, and portal collection systems, and various underground structures to collect and divert subsurface flows often exceeding 2,000 gpm. Remote work locations have also required the use of innovative construction techniques such as heavy lift helicopters to move construction materials to mines above 10,000 feet. This paper describes the 5-year implementation program which has included over 1,000,000 cubic yards of tailing regrading, application of 5,000 tons of manure and 26,000 tons of limestone, and construction of over 10,000 feet of pipeline and approximately 45,000 feet of diversion channel.« less

  13. Combined Natural Gas and Solar Technologies for Heating and Cooling in the City of NIS in Serbia

    NASA Astrophysics Data System (ADS)

    Stefanović, Velimir P.; Bojić, Milorad Lj.

    2010-06-01

    The use of conventional systems for heat and electricity production in Niš and Serbia means a constant waste of energy, and money. This problem is present in both industrial and public sector. Using conventional systems, means not only low-energy efficient systems, and technologies, but also using very "dirty" technologies, which cause heavy environment pollution. The lack of electricity in our country, and region is also present. The gas pipeline in Niš was finished not long ago, and second gas pipeline is about to be made in the next couple of years. This opens a door for implementing new technologies and the use of new methods for production of heat and electricity, while preserving our environment. This paper reports discussion of this technology with management of public institutions, which use both heat and electricity.

  14. Food Service and Nutritional Needs

    NASA Technical Reports Server (NTRS)

    Kerwin, J.

    1985-01-01

    The difficulty is that as we go into the Space Station world, the cost, effort, hardware, food trash, and food waste that the food service system will generate (which is quite tolerable on a 7 day mission), probably will be intolerable on a 90 day Space Station mission. The challenge in the food service supply is not so much packaging but systems engineering. The big constraints are in the supply pipeline. Those constraints and the possible tradeoffs are discussed.

  15. Electricity unplugged

    NASA Astrophysics Data System (ADS)

    Karalis, Aristeidis

    2009-02-01

    The judge was driving back late one cold winter night. Entering the garage, the battery-charging indicator in his wirelessly powered electric car came on. "Home at last," crossed his mind. He swiped his personal smartcard on the front-door detector to be let in. He heard a "charging" beep from his mobile phone. The blinking cursor on the half-finished e-mail on the laptop had been waiting all day on the side table. He picked the computer up and walked towards his desk. "Good evening, your honour. Your wirelessly heated robe," said the butler-robot as it approached from the kitchen. Putting on the electric garment, he sat on the medical desk chair. His artificial heart was now beating faster.

  16. Social Media: Challenges and Concerns for Families.

    PubMed

    O'Keeffe, Gwenn Schurgin

    2016-10-01

    This article explores the impact of social media on child development and family health. Why do we allow our children to use social media sites before their privacy policies allow? Why do we let them lie about their ages to use these sites? What is it about technology that lets us bend these rules in a way we would never do in the unplugged world? Gaining insight into the answers to these questions and what is positive and negative about social media and the digital world allows us to talk to families about this world, allay their concerns, and keep children of all age safe when using social media. Copyright © 2016 Elsevier Inc. All rights reserved.

  17. Investigation of the motion processes of wastewater in sewerage of high-rise buildings

    NASA Astrophysics Data System (ADS)

    Pomogaeva, Valentina; Metechko, Lyudmila; Prokofiev, Dmitry; Narezhnaya, Tamara

    2018-03-01

    When designing, constructing and operating sewage pipelines in high-rise buildings, issues of failure-free operation of a network arise. Investigation of the processes of wastewater moving allows identifying problem areas during operation, assessing the possibility of obstructions and breakdowns of plumbing traps on the gravity drainage sections of the pipeline. The article performs the schemes of the water outflow from the floor sewer into the riser, including the places where the riser is bent, of air delivery to the working riser under the change of the direction of drain movement with the dropout line set-up, with the installation of an automatic anti-vacuum valve, with the installation of the ventilation pipeline. Investigations of the process of sewage waste flow in a sewage riser were carried out, in order to select the appropriate structure. The authors consider structure features of some sections of sewerage in high-rise buildings. The exhaustion value in the riser is determined from the rarefactions that occur below the compressed cross-section of the riser and the loss of the air flow pressure coming from the atmosphere into the riser during the deflooding of the liquid. Preventing the formation of obstructions and breakdowns of plumbing traps is an integral part of sewage networks.

  18. Optimizing the Logistics of Anaerobic Digestion of Manure

    NASA Astrophysics Data System (ADS)

    Ghafoori, Emad; Flynn, Peter C.

    Electrical power production from the combustion of biogas from anaerobic digestion (AD) of manure is a means of recovering energy from animal waste. We evaluate the lowest cost method of moving material to and from centralized AD plants serving multiple confined feeding operations. Two areas are modeled, Lethbridge County, Alberta, Canada, an area of concentrated beef cattle feedlots, and Red Deer County, Alberta, a mixed-farming area with hog, dairy, chicken and beef cattle farms, and feedlots. We evaluate two types of AD plant: ones that return digestate to the source confined feeding operation for land spreading (current technology), and ones that process digestate to produce solid fertilizer and a dischargeable water stream (technology under development). We evaluate manure and digestate trucking, trucking of manure with return of digestate by pipelines, and pipelining of manure plus digestate. We compare the overall cost of power from these scenarios to farm or feedlot-based AD units. For a centralized AD plant with digestate return for land spreading the most economical transport option for manure plus digestate is by truck for the mixed-farming area and by pipelines for the concentrated feedlot area. For a centralized AD plant with digestate processing, the most economical transport option is trucking of manure for both cases.

  19. Comparison of costs for three hypothetical alternative kitchen waste management systems.

    PubMed

    Schiettecatte, Wim; Tize, Ronald; De Wever, Heleen

    2014-11-01

    Urban water and waste management continues to be a major challenge, with the Earth's population projected to rise to 9 billion by 2050, with 70% of this population expected to live in cities. A combined treatment of wastewater and the organic fraction of municipal solid waste offers opportunities for improved environmental protection and energy recovery, but the collection and transport of organic wastes must be cost effective. This study compares three alternative kitchen waste collection and transportation systems for a virtual modern urban area with 300,000 residents and a population density of 10,000 persons per square kilometre. Door-to-door collection, being the standard practice in modern urban centres, remains the most economically advantageous at a cost of 263 euros per tonne of kitchen waste. Important drawbacks are the difficult logistics, increased city traffic, air and noise pollution. The quieter, cleaner and more hygienic vacuum transport of kitchen waste comes with a higher cost of 367 euros per tonne, mainly resulting from a higher initial investment cost for the system installation. The third option includes the well-known use of under-sink food waste disposers (often called garbage grinders) that are connected to the kitchen's wastewater piping system, with a total yearly cost of 392 euros per tonne. Important advantages with this system are the clean operation and the current availability of a city-wide sewage conveyance pipeline system. Further research is recommended, for instance the application of a life cycle assessment approach, to more fully compare the advantages and disadvantages of each option. © The Author(s) 2014.

  20. Landfill site selection using geographic information system and analytical hierarchy process: A case study Al-Hillah Qadhaa, Babylon, Iraq.

    PubMed

    Chabuk, Ali; Al-Ansari, Nadhir; Hussain, Hussain Musa; Knutsson, Sven; Pusch, Roland

    2016-05-01

    Al-Hillah Qadhaa is located in the central part of Iraq. It covers an area of 908 km(2) with a total population of 856,804 inhabitants. This Qadhaa is the capital of Babylon Governorate. Presently, no landfill site exists in that area based on scientific site selection criteria. For this reason, an attempt has been carried out to find the best locations for landfills. A total of 15 variables were considered in this process (groundwater depth, rivers, soil types, agricultural land use, land use, elevation, slope, gas pipelines, oil pipelines, power lines, roads, railways, urban centres, villages and archaeological sites) using a geographic information system. In addition, an analytical hierarchy process was used to identify the weight for each variable. Two suitable candidate landfill sites were determined that fulfil the requirements with an area of 9.153 km(2) and 8.204 km(2) These sites can accommodate solid waste till 2030. © The Author(s) 2016.

  1. Use of high-resolution geophysical and geotechnical techniques for artificial reef site selection, west Cameron planning area, offshore Louisiana

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pope, D.L.; Wagner, J.B.

    1988-09-01

    Before siting oil and gas platforms on the sea floor as artificial reefs offshore Louisiana, potentially hazardous and unstable geologic conditions must be identified and evaluated to assess their possible impacts on platform stability. Geologic and man-made features can be identified and assessed from high-resolution geophysical techniques (3.5-7.0 kHz echograms, single-channel seismic, and side-scan sonar). Such features include faults, diapirs, scarps, channels, gas seeps, irregular sea floor topography, mass wasting deposits (slumps, slides, and debris flows), pipelines, and other subsea marine equipment. Geotechnical techniques are utilized to determine lithologic and physical properties of the sediments for correlation with the geophysicalmore » data. These techniques are used to develop a series of geologic maps, cross sections, and pipeline and platform-location maps. Construction of echo-character maps from 3.5-kHz data provides an analysis of near-bottom sedimentation processes (turbidity currents and debris flows).« less

  2. Performance analysis of a counter-rotating tubular type micro-turbine by experiment and CFD

    NASA Astrophysics Data System (ADS)

    Lee, N. J.; Choi, J. W.; Hwang, Y. H.; Kim, Y. T.; Lee, Y. H.

    2012-11-01

    Micro hydraulic turbines have a growing interest because of its small and simple structure, as well as a high possibility of using in micro and small hydropower applications. The differential pressure existing in city water pipelines can be used efficiently to generate electricity in a way similar to that of energy being generated through gravitational potential energy in dams. The pressure energy in the city pipelines is often wasted by using pressure reducing valves at the inlet of water cleaning centers. Instead of using the pressure reducing valves, a micro counter-rotating hydraulic turbine can be used to make use of the pressure energy. In the present paper, a counter-rotating tubular type micro-turbine is studied, with the front runner connected to the generator stator and the rear runner connected to the generator rotor. The performance of the turbine is investigated experimentally and numerically. A commercial ANSYS CFD code was used for numerical analysis.

  3. Hydraulic Mineral Waste Transport and Storage

    NASA Astrophysics Data System (ADS)

    Pullum, Lionel; Boger, David V.; Sofra, Fiona

    2018-01-01

    Conventional mineral waste disposal involves pumping dilute concentration suspensions of tailings to large catchment areas, where the solids settle to form a consolidated base while the excess water is evaporated. Unfortunately, this often takes years, if ever, to occur, and the interim period poses a severe threat to the surrounding countryside and water table. A worldwide movement to increase the concentration of these tailings to pastes for disposal above and below ground, obviating some of these issues, has led to the development of new technologies. Increasing the solids concentrations invariably produces non-Newtonian effects that can mask the underlying nature of the suspension mechanics, resulting in the use of poor pipeline and disposal methods. Combining rheological characterization and analysis with non-Newtonian suspension fluid mechanics provides insight into these flows, both laminar and turbulent. These findings provide the necessary basis for successful engineering designs.

  4. Supplement B to compilation of air pollutant emission factors, volume 1. Stationary point and area sources

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This document contains emission factors and process information for more than 200 air pollution source categories. This Supplement to AP-42 addresses pollutant-generating activity from Bituminous And Subbituminous Coal Combustion, Anthracite Coal Combustion, Fuel Oil Combustion, Natural Gas Combustion, Liquefied Petroleum Gas Combustion, Wood Waste Combustion In Boilers, Lignite Combustion, Bagasse Combustion In Sugar Mills, Residential Fireplaces, Residential Wood Stoves, Waste Oil Combustion, Stationary Gas Turbines For Electricity Generation, Heavy-duty Natural Gas-fired Pipeline Compressor Engines And Turbines, Gasoline and Diesel Industrial Engines, Large Stationary Diesel And All Stationary Dual-fuel Engines, Adipic Acid, Cotton Ginning, Alfafalfa Dehydrating, Malt Beverages, Ceramic Products Manufacturing,more » Electroplating, Wildfires And Prescribed Burning, Emissions From Soils-Greenhouse Gases, Termites-Greenhouse Gases, and Lightning Emissions-Greenhouse Gases.« less

  5. Supplement a to compilation of air pollutant emission factors. Volume 1. Stationary point and area sources. Fifth edition

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-02-01

    This Supplement to AP-42 addresses pollutant-generating activity from Bituminous and Subbituminous Coal Combustion; Anthracite Coal Combustion; Fuel Oil Combustion; Natural Gas Combustion; Wood Waste Combustion in Boilers; Lignite Combustion; Waste Oil Combustion: Stationary Gas Turbines for Electricity Generation; Heavy-duty Natural Gas-fired Pipeline Compressor Engines; Large Stationary Diesel and all Stationary Dual-fuel engines; Natural Gas Processing; Organic Liquid Storage Tanks; Meat Smokehouses; Meat Rendering Plants; Canned Fruits and Vegetables; Dehydrated Fruits and Vegetables; Pickles, Sauces and Salad Dressing; Grain Elevators and Processes; Cereal Breakfast Foods; Pasta Manufacturing; Vegetable Oil Processing; Wines and Brandy; Coffee Roasting; Charcoal; Coal Cleaning; Frit Manufacturing; Sandmore » and Gravel Processing; Diatomite Processing; Talc Processing; Vermiculite Processing; paved Roads; and Unpaved Roads. Also included is information on Generalized Particle Size Distributions.« less

  6. Unplugging the callose plug from sieve pores.

    PubMed

    Xie, Bo; Hong, Zonglie

    2011-04-01

    The presence of callose in sieve plates has been known for a long time, but how this polysaccharide plug is synthesized has remained unsolved. Two independent laboratories have recently reported the identification of callose synthase 7 (CalS7), also known as glucan synthase-like 7 (GSL7), as the enzyme responsible for callose deposition in sieve plates. Mutant plants defective in this enzyme failed to synthesize callose in developing sieve plates during phloem formation and were unable to accumulate callose in sieve pores in response to stress treatments. The mutant plants developed less open pores per sieve plate and the pores were smaller in diameter. As a result, phloem conductivity was reduced significantly and the mutant plants were shorter and set fewer seeds.

  7. Macromolecular crystal growing system

    NASA Technical Reports Server (NTRS)

    Snyder, Robert S. (Inventor); Herren, Blair J. (Inventor); Carter, Daniel C. (Inventor); Yost, Vaughn H. (Inventor); Bugg, Charles E. (Inventor); Delucas, Lawrence J. (Inventor); Suddath, Fred L. (Inventor)

    1991-01-01

    A macromolecular crystal growing system especially designed for growing crystals in the low gravity of space as well as the gravity of earth includes at least one tray assembly, a carrier assembly which receives the tray, and a refrigeration-incubation module in which the carrier assembly is received. The tray assembly includes a plurality of sealed chambers with a plastic syringe and a plug means for the double tip of the syringe provided therein. Ganging mechanisms operate the syringes and plugs simultaneously in a precise and smooth operation. Preferably, the tray assemblies are mounted on ball bearing slides for smooth operation in inserting and removing the tray assemblies into the carrier assembly. The plugging mechanism also includes a loading control mechanism. A mechanism for leaving a syringe unplugged is also provided.

  8. Unplugging the callose plug from sieve pores

    PubMed Central

    Xie, Bo

    2011-01-01

    The presence of callose in sieve plates has been known for a long time, but how this polysaccharide plug is synthesized has remained unsolved. Two independent laboratories have recently reported the identification of callose synthase 7 (CalS7), also known as glucan synthase-like 7 (GSL7), as the enzyme responsible for callose deposition in sieve plates. Mutant plants defective in this enzyme failed to synthesize callose in developing sieve plates during phloem formation and were unable to accumulate callose in sieve pores in response to stress treatments. The mutant plants developed less open pores per sieve plate and the pores were smaller in diameter. As a result, phloem conductivity was reduced significantly and the mutant plants were shorter and set fewer seeds. PMID:21386663

  9. INTEGRATED POWER GENERATION SYSTEMS FOR COAL MINE WASTE METHANE UTILIZATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peet M. Soot; Dale R. Jesse; Michael E. Smith

    2005-08-01

    An integrated system to utilize the waste coal mine methane (CMM) at the Federal No. 2 Coal Mine in West Virginia was designed and built. The system includes power generation, using internal combustion engines, along with gas processing equipment to upgrade sub-quality waste methane to pipeline quality standards. The power generation has a nominal capacity of 1,200 kw and the gas processing system can treat about 1 million cubic feet per day (1 MMCFD) of gas. The gas processing is based on the Northwest Fuel Development, Inc. (NW Fuel) proprietary continuous pressure swing adsorption (CPSA) process that can remove nitrogenmore » from CMM streams. The two major components of the integrated system are synergistic. The byproduct gas stream from the gas processing equipment can be used as fuel for the power generating equipment. In return, the power generating equipment provides the nominal power requirements of the gas processing equipment. This Phase III effort followed Phase I, which was comprised of a feasibility study for the project, and Phase II, where the final design for the commercial-scale demonstration was completed. The fact that NW Fuel is desirous of continuing to operate the equipment on a commercial basis provides the validation for having advanced the project through all of these phases. The limitation experienced by the project during Phase III was that the CMM available to operate the CPSA system on a commercial basis was not of sufficiently high quality. NW Fuel's CPSA process is limited in its applicability, requiring a relatively high quality of gas as the feed to the process. The CPSA process was demonstrated during Phase III for a limited time, during which the processing capabilities met the expected results, but the process was never capable of providing pipeline quality gas from the available low quality CMM. The NW Fuel CPSA process is a low-cost ''polishing unit'' capable of removing a few percent nitrogen. It was never intended to process CMM streams containing high levels of nitrogen, as is now the case at the Federal No.2 Mine. Even lacking the CPSA pipeline delivery demonstration, the project was successful in laying the groundwork for future commercial applications of the integrated system. This operation can still provide a guide for other coal mines which need options for utilization of their methane resources. The designed system can be used as a complete template, or individual components of the system can be segregated and utilized separately at other mines. The use of the CMM not only provides an energy fuel from an otherwise wasted resource, but it also yields an environmental benefit by reducing greenhouse gas emissions. The methane has twenty times the greenhouse effect as compared to carbon dioxide, which the combustion of the methane generates. The net greenhouse gas emission mitigation is substantial.« less

  10. Pipeline bottoming cycle study. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1980-06-01

    The technical and economic feasibility of applying bottoming cycles to the prime movers that drive the compressors of natural gas pipelines was studied. These bottoming cycles convert some of the waste heat from the exhaust gas of the prime movers into shaft power and conserve gas. Three typical compressor station sites were selected, each on a different pipeline. Although the prime movers were different, they were similar enough in exhaust gas flow rate and temperature that a single bottoming cycle system could be designed, with some modifications, for all three sites. Preliminary design included selection of the bottoming cycle workingmore » fluid, optimization of the cycle, and design of the components, such as turbine, vapor generator and condensers. Installation drawings were made and hardware and installation costs were estimated. The results of the economic assessment of retrofitting bottoming cycle systems on the three selected sites indicated that profitability was strongly dependent upon the site-specific installation costs, how the energy was used and the yearly utilization of the apparatus. The study indicated that the bottoming cycles are a competitive investment alternative for certain applications for the pipeline industry. Bottoming cycles are technically feasible. It was concluded that proper design and operating practices would reduce the environmental and safety hazards to acceptable levels. The amount of gas that could be saved through the year 2000 by the adoption of bottoming cycles for two different supply projections was estimated as from 0.296 trillion ft/sup 3/ for a low supply projection to 0.734 trillion ft/sup 3/ for a high supply projection. The potential market for bottoming cycle equipment for the two supply projections varied from 170 to 500 units of varying size. Finally, a demonstration program plan was developed.« less

  11. Landfill site selection by using geographic information systems

    NASA Astrophysics Data System (ADS)

    Şener, Başak; Süzen, M. Lütfi; Doyuran, Vedat

    2006-01-01

    One of the serious and growing potential problems in most large urban areas is the shortage of land for waste disposal. Although there are some efforts to reduce and recover the waste, disposal in landfills is still the most common method for waste destination. An inappropriate landfill site may have negative environmental, economic and ecological impacts. Therefore, it should be selected carefully by considering both regulations and constraints on other sources. In this study, candidate sites for an appropriate landfill area in the vicinity of Ankara are determined by using the integration of geographic information systems and multicriteria decision analysis (MCDA). For this purpose, 16 input map layers including topography, settlements (urban centers and villages), roads (Highway E90 and village roads), railways, airport, wetlands, infrastructures (pipelines and power lines), slope, geology, land use, floodplains, aquifers and surface water are prepared and two different MCDA methods (simple additive weighting and analytic hierarchy process) are implemented to a geographical information system. Comparison of the maps produced by these two different methods shows that both methods yield conformable results. Field checks also confirm that the candidate sites agree well with the selected criteria.

  12. Hydrocarbon-soluble low-melting corrosion inhibitor TAL-3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nesterenko, S.A.; Sorokin, V.I.; Naumenko, O.V.

    1987-03-01

    The inhibitor TAL-3 is intended for the corrosion protection of metals that come into contact with two-phase systems of the hydrocarbon-water type. It is applicable to the service conditions of equipment and pipelines of the petroleum and petroleum refining industries. The purpose of this paper was to electrochemically assess its solubility in such systems and its inhibitory properties on samples of 08kp steel toward the effects of refinery and oil field waste water and process emulsions both on the laboratory scale and in field tests.

  13. WTP Pretreatment Facility Potential Design Deficiencies--Sliding Bed and Sliding Bed Erosion Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, E. K.

    2015-05-06

    This assessment is based on readily available literature and discusses both Newtonian and non-Newtonian slurries with respect to sliding beds and erosion due to sliding beds. This report does not quantify the size of the sliding beds or erosion rates due to sliding beds, but only assesses if they could be present. This assessment addresses process pipelines in the Pretreatment (PT) facility and the high level waste (HLW) transfer lines leaving the PT facility to the HLW vitrification facility concentrate receipt vessel.

  14. Enhanced oil recovery system

    DOEpatents

    Goldsberry, Fred L.

    1989-01-01

    All energy resources available from a geopressured geothermal reservoir are used for the production of pipeline quality gas using a high pressure separator/heat exchanger and a membrane separator, and recovering waste gas from both the membrane separator and a low pressure separator in tandem with the high pressure separator for use in enhanced oil recovery, or in powering a gas engine and turbine set. Liquid hydrocarbons are skimmed off the top of geothermal brine in the low pressure separator. High pressure brine from the geothermal well is used to drive a turbine/generator set before recovering waste gas in the first separator. Another turbine/generator set is provided in a supercritical binary power plant that uses propane as a working fluid in a closed cycle, and uses exhaust heat from the combustion engine and geothermal energy of the brine in the separator/heat exchanger to heat the propane.

  15. Remaining Sites Verification Package for the 100-F-46, 119-F Stack Sampling French Drain, Waste Site Reclassification Form 2008-021

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    J. M. Capron

    2008-08-08

    The 100-F-46 french drain consisted of a 1.5 to 3 m long, vertically buried, gravel-filled pipe that was approximately 1 m in diameter. Also included in this waste site was a 5 cm cast-iron pipeline that drained condensate from the 119-F Stack Sampling Building into the 100-F-46 french drain. In accordance with this evaluation, the confirmatory sampling results support a reclassification of this site to No Action. The current site conditions achieve the remedial action objectives and the corresponding remedial action goals established in the Remaining Sites ROD. The results of confirmatory sampling show that residual contaminant concentrations do notmore » preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River.« less

  16. OVERVIEW OF CYANIDE PLANT REMAINS, TAILINGS PILES, PARKING LOT, AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    OVERVIEW OF CYANIDE PLANT REMAINS, TAILINGS PILES, PARKING LOT, AND MINE MANAGER'S HOME, LOOKING SOUTH SOUTHEAST. RIGHT, TAILINGS PILES ARE AT CENTER WITH CYANIDE PLANT FOUNDATIONS TO THE LEFT OF THE PILES. PARKING LOT IS AT UPPER LEFT. THE AREA BETWEEN THE COLLAPSED TANK AT CENTER LEFT AND THE REMAINS OF THE MANAGER'S HOUSE AT LOWER RIGHT IS A TAILINGS HOLDING AREA. TAILINGS FROM THE MILL WERE HELD HERE. THE LARGE SETTLING TANKS WERE CHARGED FROM THIS HOLDING AREA BY A TRAM ON RAILS AND BY A SLUICEWAY SEEN AS THE DARK SPOT ON THE CENTER LEFT EDGE OF THE FRAME. AFTER THE TAILINGS WERE LEACHED, THEY WERE DEPOSITED ON THE LARGE WASTE PILE AT CENTER RIGHT. THE TANK AT CENTER RIGHT EDGE IS WHERE THE WATER PIPELINE ENTERED THE WORKS. A STRAIGHT LINE OF POSTS IN THE GROUND GO ACROSS THE CENTER FROM LEFT TO RIGHT, WHICH ORIGINALLY SUSPENDED THE WATER PIPELINE GOING FROM THE WATER HOLDING TANK AT RIGHT UP TO THE SECONDARY WATER TANKS ABOVE THE MILL. - Keane Wonder Mine, Park Route 4 (Daylight Pass Cutoff), Death Valley Junction, Inyo County, CA

  17. Monitoring underground water leakage pattern by ground penetrating radar (GPR) using 800 MHz antenna frequency

    NASA Astrophysics Data System (ADS)

    Amran, T. S. T.; Ismail, M. P.; Ahmad, M. R.; Amin, M. S. M.; Ismail, M. A.; Sani, S.; Masenwat, N. A.; Basri, N. S. M.

    2018-01-01

    Water is the most treasure natural resources, however, a huge amount of water are lost during its distribution that leads to water leakage problem. The leaks meant the waste of money and created more economic loss to treat and fix the damaged pipe. Researchers and engineers have put tremendous attempts and effort, to solve the water leakage problem especially in water leakage of buried pipeline. An advanced technology of ground penetrating radar (GPR) has been established as one of the non-destructive testing (NDT) method to detect the underground water pipe leaking. This paper focuses on the ability of GPR in water utility field especially on detection of water leaks in the underground pipeline distribution. A series of laboratory experiments were carried out using 800-MHz antenna, where the performance of GPR on detecting underground pipeline and locating water leakage was investigated and validated. A prototype to recreate water-leaking system was constructed using a 4-inch PVC pipe. Different diameter of holes, i.e. ¼ inch, ½ inch, and ¾ inch, were drilled into the pipe to simulate the water leaking. The PVC pipe was buried at the depth of 60 cm into the test bed that was filled with dry sand. 15 litres of water was injected into the PVC pipe. The water leakage patterns in term of radargram data were gathered. The effectiveness of the GPR in locating the underground water leakage was ascertained, after the results were collected and verified.

  18. Greening coal: breakthroughs and challenges in carbon capture and storage.

    PubMed

    Stauffer, Philip H; Keating, Gordon N; Middleton, Richard S; Viswanathan, Hari S; Berchtold, Kathryn A; Singh, Rajinder P; Pawar, Rajesh J; Mancino, Anthony

    2011-10-15

    Like it or not, coal is here to stay, for the next few decades at least. Continued use of coal in this age of growing greenhouse gas controls will require removing carbon dioxide from the coal waste stream. We already remove toxicants such as sulfur dioxide and mercury, and the removal of CO₂ is the next step in reducing the environmental impacts of using coal as an energy source (i.e., greening coal). This paper outlines some of the complexities encountered in capturing CO₂ from coal, transporting it large distances through pipelines, and storing it safely underground.

  19. Remaining Sites Verification Package for the 1607-B1 Septic System, Waste Site Reclassification Form 2007-015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    L. M. Dittmer

    2007-08-30

    The 1607-B1 Septic System includes a septic tank, drain field, and associated connecting pipelines and influent sanitary sewer lines. This septic system serviced the former 1701-B Badgehouse, 1720-B Patrol Building/Change Room, and the 1709-B Fire Headquarters. The 1607-B1 waste site received unknown amounts of nonhazardous, nonradioactive sanitary sewage from these facilities during its operational history from 1944 to approximately 1970. In accordance with this evaluation, the confirmatory sampling results support a reclassification of this site to No Action. The current site conditions achieve the remedial action objectives and the corresponding remedial action goals established in the Remaining Sites ROD. Themore » results of confirmatory sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River.« less

  20. [Progress and prospect of bio-jet fuels industry in domestic and overseas].

    PubMed

    Qiao, Kai; Fu, Jie; Zhou, Feng; Ma, Huixia

    2016-10-25

    We reviewed the progress of the bio-jet fuels industry in recent years and systematically analyzed the technical routes that have been approved or in the pipeline for approval by ASTM D7566. In addition, we highlighted a novel pathway to produce drop-in fuel by near-critical hydrolysis of waste cooking oils or algal oils followed by catalytic decarboxylation. Also, we introduced the source of oils and fats feedstock and the domestic bio-jet fuel industry status during the 12th Five-Year-Plan period. Based on our own research, we discussed the prospect of the bio-jet fuel industry and future research needs.

  1. Methane enrichment digestion experiments at the anaerobic experimental test unit at Walt Disney World. Final report, March 1989-August 1990

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Srivastava, V.J.; Hill, A.H.

    1993-06-01

    The goal of the project was to determine the technical feasibility of utilizing a novel concept in anaerobic digestion, in-situ methane enrichment digestion or MED for producing utility-grade gas from a pilot-scale anaerobic digester. MED tests conducted during this program consistently achieved digester product gas with a methane (CH4) content of greater than 90% (on a dry-, nitrogen-free basis). The MED concept, because it requires relatively simple equipment and modest energy input, has the potential to simplify gas cleanup requirements and substantially reduce the cost of converting wastes and biomass to pipeline quality gas.

  2. An Observer's View of the ORAC System at UKIRT

    NASA Astrophysics Data System (ADS)

    Wright, G. S.; Bridger, A. B.; Pickup, D. A.; Tan, M.; Folger, M.; Economou, F.; Adamson, A. J.; Currie, M. J.; Rees, N. P.; Purves, M.; Kackley, R. D.

    The Observatory Reduction and Acquisition Control system (ORAC) was commissioned with its first instrument at the UK Infrared Telescope (UKIRT) in October 1999, and with all of the other UKIRT instrumentation this year. ORAC's advance preparation Observing Tool makes it simpler to prepare and carry out observations. Its Observing Manager gives observers excellent feedback on their observing as it goes along, reducing wasted time. The ORAC pipelined Data Reduction system produces near-publication quality reduced data at the telescope. ORAC is now in use for all observing at UKIRT, including flexibly scheduled nights and service observing. This paper provides an observer's perspective of the system and its performance.

  3. Conceptual design assessment for the co-firing of bio-refinery supplied lignin project. Quarterly report, July 1--September 30, 2000

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berglund, T.; Ranney, J.T.; Babb, C.L.

    2000-10-01

    The initial design criteria of the MSW to ethanol facility have been completed along with preliminary site identification and layouts for the processing facility. These items are the first step in evaluating the feasibility of this co-located facility. Pilot facility design and modification are underway for the production and dewatering of the lignin fuel. Major process equipment identification has been completed and several key unit operations will be accomplished on rental equipment. Equipment not available for rental or at TVA has been ordered and facility modification and shakedown will begin in October. The study of the interface and resulting impactsmore » on the TVA Colbert facility are underway. The TVA Colbert fossil plant is fully capable of providing a reliable steam supply for the proposed Masada waste processing facility. The preferred supply location in the Colbert steam cycle has been identified as have possible steam pipeline routes to the Colbert boundary. Additional analysis is underway to fully predict the impact of the steam supply on Colbert plant performance and to select a final steam pipeline route.« less

  4. Research of Cemented Paste Backfill in Offshore Environments

    NASA Astrophysics Data System (ADS)

    Wang, Kun; Yang, Peng; Lyu, Wensheng; Lin, Zhixiang

    2018-01-01

    To promote comprehensive utilization of mine waste tailings and control ground pressure, filling mine stopes with cement paste backfill (CPB) is becoming the most widely used and applicable method in contemporary underground mining. However, many urgent new problems have arisen during the exploitation in offshore mines owing to the complex geohydrology conditions. A series of rheological, settling and mechanical tests were carried out to study the influences of bittern ions on CPB properties in offshore mining. The results showed that: (1) the bittern ion compositions and concentrations of backfill water sampled in mine filling station were similar to seawater. Backfill water mixed CPB slurry with its higher viscosity coefficient was adverse to pipeline gravity transporting; (2) Bleeding rate of backfill water mixed slurry was lower than that prepared with tap water at each cement-tailings ratio; (3) The UCS values of backfill water mixed samples were higher at early curing ages (3d, 7d) and then became lower after longer curing time at 14d and 28d. Therefore, for mine production practice, the offshore environments can have adverse effects on the pipeline gravity transporting and have positive effects on stope dewatering process and early-age strength growth.

  5. Mass wasting triggered by the 5 March 1987 Ecuador earthquakes

    USGS Publications Warehouse

    Schuster, R.L.; Nieto, A.S.; O'Rourke, T. D.; Crespo, E.; Plaza-Nieto, G.

    1996-01-01

    On 5 March 1987, two earthquakes (Ms=6.1 and Ms=6.9) occurred about 25 km north of Reventador Volcano, along the eastern slopes of the Andes Mountains in northeastern Ecuador. Although the shaking damaged structures in towns and villages near the epicentral area, the economic and social losses directly due to earthquake shaking were small compared to the effects of catastrophic earthquake-triggered mass wasting and flooding. About 600 mm of rain fell in the region in the month preceding the earthquakes; thus, the surficial soils had high moisture contents. Slope failures commonly started as thin slides, which rapidly turned into fluid debris avalanches and debris flows. The surficial soils and thick vegetation covering them flowed down the slopes into minor tributaries and then were carried into major rivers. Rock and earth slides, debris avalanches, debris and mud flows, and resulting floods destroyed about 40 km of the Trans-Ecuadorian oil pipeline and the only highway from Quito to Ecuador's northeastern rain forests and oil fields. Estimates of total volume of earthquake-induced mass wastage ranged from 75-110 million m3. Economic losses were about US$ 1 billion. Nearly all of the approximately 1000 deaths from the earthquakes were a consequence of mass wasting and/ or flooding.

  6. Estimating Residual Solids Volume In Underground Storage Tanks

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clark, Jason L.; Worthy, S. Jason; Martin, Bruce A.

    2014-01-08

    The Savannah River Site liquid waste system consists of multiple facilities to safely receive and store legacy radioactive waste, treat, and permanently dispose waste. The large underground storage tanks and associated equipment, known as the 'tank farms', include a complex interconnected transfer system which includes underground transfer pipelines and ancillary equipment to direct the flow of waste. The waste in the tanks is present in three forms: supernatant, sludge, and salt. The supernatant is a multi-component aqueous mixture, while sludge is a gel-like substance which consists of insoluble solids and entrapped supernatant. The waste from these tanks is retrieved andmore » treated as sludge or salt. The high level (radioactive) fraction of the waste is vitrified into a glass waste form, while the low-level waste is immobilized in a cementitious grout waste form called saltstone. Once the waste is retrieved and processed, the tanks are closed via removing the bulk of the waste, chemical cleaning, heel removal, stabilizing remaining residuals with tailored grout formulations and severing/sealing external penetrations. The comprehensive liquid waste disposition system, currently managed by Savannah River Remediation, consists of 1) safe storage and retrieval of the waste as it is prepared for permanent disposition; (2) definition of the waste processing techniques utilized to separate the high-level waste fraction/low-level waste fraction; (3) disposition of LLW in saltstone; (4) disposition of the HLW in glass; and (5) closure state of the facilities, including tanks. This paper focuses on determining the effectiveness of waste removal campaigns through monitoring the volume of residual solids in the waste tanks. Volume estimates of the residual solids are performed by creating a map of the residual solids on the waste tank bottom using video and still digital images. The map is then used to calculate the volume of solids remaining in the waste tank. The ability to accurately determine a volume is a function of the quantity and quality of the waste tank images. Currently, mapping is performed remotely with closed circuit video cameras and still photograph cameras due to the hazardous environment. There are two methods that can be used to create a solids volume map. These methods are: liquid transfer mapping / post transfer mapping and final residual solids mapping. The task is performed during a transfer because the liquid level (which is a known value determined by a level measurement device) is used as a landmark to indicate solids accumulation heights. The post transfer method is primarily utilized after the majority of waste has been removed. This method relies on video and still digital images of the waste tank after the liquid transfer is complete to obtain the relative height of solids across a waste tank in relation to known and usable landmarks within the waste tank (cooling coils, column base plates, etc.). In order to accurately monitor solids over time across various cleaning campaigns, and provide a technical basis to support final waste tank closure, a consistent methodology for volume determination has been developed and implemented at SRS.« less

  7. 77 FR 70543 - Pipeline Safety: Meeting of the Gas Pipeline Advisory Committee and the Liquid Pipeline Advisory...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-26

    .... PHMSA-2009-0203] Pipeline Safety: Meeting of the Gas Pipeline Advisory Committee and the Liquid Pipeline..., and safety policies for natural gas pipelines and for hazardous liquid pipelines. Both committees were...: Notice of advisory committee meeting. SUMMARY: This notice announces a public meeting of the Gas Pipeline...

  8. Independent Review of Elemental Phosphorus Remediation at the Eastern Michaud Flats FMC Operable Unit near Pocatello, Idaho

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Martino, L. E.; Jerden, J. J.; Kimmell, T. A.

    2016-01-01

    If, despite risks to workers and these potential impacts, stakeholders decide that P4 wastes need to be excavated and treated, the Review Team determined that a number of the ETTs examined warrant further consideration for the treatment of P4 waste that has been characterized (for example, P4 waste present in the historical ponds). Nevertheless, concerns about the health and safety of site investigation workers using then-available investigation approaches prevented the collection of subsurface samples containing P4 from large areas of the site (e.g., the railroad swale, the vadose zone beneath the Furnace Building, and the abandoned railcars), As a result,more » the contaminant CSM in those particular areas was not refined enough to allow the Review Team to draw conclusions about using some of the ETTs to treat P4 waste in those areas. The readiness of an ETT for implementation varies depending on many factors, including stakeholder input, permitting, and remedial action construction requirements. Technologies that could be ready for use in the near term (within 1 year) include the following: mechanical excavation, containment technologies, off-site incineration, and drying and mechanical mixing under a tent structure. Technologies that could be ready for use in the mid-term (1 to 2 years) include cutter suction dredging, thermal-hydraulic dredging, and underground pipeline cleaning technologies. Technologies requiring a longer lead time (2 to 5 years) include on-site incineration, a land disposal restriction waste treatment system, an Albright & Wilson batch mud still, post-treatment on-site disposal, and post-treatment off-site disposal.« less

  9. 78 FR 70623 - Pipeline Safety: Meeting of the Gas Pipeline Advisory Committee and the Liquid Pipeline Advisory...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-26

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2009-0203] Pipeline Safety: Meeting of the Gas Pipeline Advisory Committee and the Liquid Pipeline Advisory Committee AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. [[Page...

  10. Chernobyl NPP: Completion of LRW Treatment Plant and LRW Management on Site - 12568

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fedorov, Denis; Adamovich, Dmitry; Klimenko, I.

    2012-07-01

    Since a beginning of ChNPP operation, and after a tragedy in 1986, a few thousands m3 of LRW have been collected in a storage tanks. In 2004 ChNPP started the new project on creation of LRW treatment plant (LRWTP) financed from EBRD fund. But it was stopped in 2008 because of financial and contract problems. In 2010 SIA RADON jointly with Ukrainian partners has won a tender on completion of LRWTP, in particular I and C system. The purpose of LRTP is to process liquid rad-wastes from SSE 'Chernobyl NPP' site and those liquids stored in the LRWS and SLRWSmore » tanks as well as the would-be wastes after ChNPP Power Units 1, 2 and 3 decommissioning. The LRTP design lifetime - 20 years. Currently, the LRTP is getting ready to perform the following activities: 1. retrieval of waste from tanks stored at ChNPP LWS using waste retrieval system with existing equipment involved; 2. transfer of retrieved waste into LRTP reception tanks with partial use of existing transfer pipelines; 3. laboratory chemical and radiochemical analysis of reception tanks contest to define the full spectrum of characteristics before processing, to acknowledge the necessity of preliminary processing and to select end product recipe; 4. preliminary processing of the waste to meet the requirements for further stages of the process; 5. shrinkage (concentrating) of preliminary processed waste; 6. solidification of preliminary processed waste with concrete to make a solid-state (end product) and load of concrete compound into 200-l drums; 7. curing of end product drums in LRTP curing hall; 8. radiologic monitoring of end product drums and their loading into special overpacks; 9. overpack radiological monitoring; 10. send for disposal (ICSRM Lot 3); The current technical decisions allow to control and return to ChNPP of process media and supporting systems outputs until they satisfy the following quality norms: salt content: < 100 g/l; pH: 1 - 11; anionic surface-active agent: < 25 mg/l; oil dissipated in the liquid: < 2 mg/l; overall gamma-activity: < 3,7 x10{sup 5} Bq/l. (authors)« less

  11. 75 FR 24655 - Order Finding That the ICE Waha Financial Basis Contract Traded on the IntercontinentalExchange...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-05

    ... Texas. Pipelines include El Paso Natural Gas, Transwestern Pipeline, Natural Gas Pipeline Co. of America, Northern Natural Gas, Delhi Pipeline, Oasis Pipeline, EPGT Texas and Lone Star Pipeline. The Platt's [[Page... pipelines. These pipelines bring in natural gas from fields in the Gulf Coast region and ship it to major...

  12. A road damage and life-cycle greenhouse gas comparison of trucking and pipeline water delivery systems for hydraulically fractured oil and gas field development in Colorado

    PubMed Central

    Duthu, Ray C.

    2017-01-01

    The process of hydraulic fracturing for recovery of oil and natural gas uses large amounts of fresh water and produces a comparable amount of wastewater, much of which is typically transported by truck. Truck transport of water is an expensive and energy-intensive process with significant external costs including roads damages, and pollution. The integrated development plan (IDP) is the industry nomenclature for an integrated oil and gas infrastructure system incorporating pipeline-based transport of water and wastewater, centralized water treatment, and high rates of wastewater recycling. These IDP have been proposed as an alternative to truck transport systems so as to mitigate many of the economic and environmental problems associated with natural gas production, but the economic and environmental performance of these systems have not been analyzed to date. This study presents a quantification of lifecycle greenhouse gas (GHG) emissions and road damages of a generic oil and gas field, and of an oil and gas development sited in the Denver-Julesburg basin in the northern Colorado region of the US. Results demonstrate that a reduction in economic and environmental externalities can be derived from the development of these IDP-based pipeline water transportation systems. IDPs have marginal utility in reducing GHG emissions and road damage when they are used to replace in-field water transport, but can reduce GHG emissions and road damage by factors of as much as 6 and 7 respectively, when used to replace fresh water transport and waste-disposal routes for exemplar Northern Colorado oil and gas fields. PMID:28686682

  13. A road damage and life-cycle greenhouse gas comparison of trucking and pipeline water delivery systems for hydraulically fractured oil and gas field development in Colorado.

    PubMed

    Duthu, Ray C; Bradley, Thomas H

    2017-01-01

    The process of hydraulic fracturing for recovery of oil and natural gas uses large amounts of fresh water and produces a comparable amount of wastewater, much of which is typically transported by truck. Truck transport of water is an expensive and energy-intensive process with significant external costs including roads damages, and pollution. The integrated development plan (IDP) is the industry nomenclature for an integrated oil and gas infrastructure system incorporating pipeline-based transport of water and wastewater, centralized water treatment, and high rates of wastewater recycling. These IDP have been proposed as an alternative to truck transport systems so as to mitigate many of the economic and environmental problems associated with natural gas production, but the economic and environmental performance of these systems have not been analyzed to date. This study presents a quantification of lifecycle greenhouse gas (GHG) emissions and road damages of a generic oil and gas field, and of an oil and gas development sited in the Denver-Julesburg basin in the northern Colorado region of the US. Results demonstrate that a reduction in economic and environmental externalities can be derived from the development of these IDP-based pipeline water transportation systems. IDPs have marginal utility in reducing GHG emissions and road damage when they are used to replace in-field water transport, but can reduce GHG emissions and road damage by factors of as much as 6 and 7 respectively, when used to replace fresh water transport and waste-disposal routes for exemplar Northern Colorado oil and gas fields.

  14. Catalog of selected heavy duty transport energy management models

    NASA Technical Reports Server (NTRS)

    Colello, R. G.; Boghani, A. B.; Gardella, N. C.; Gott, P. G.; Lee, W. D.; Pollak, E. C.; Teagan, W. P.; Thomas, R. G.; Snyder, C. M.; Wilson, R. P., Jr.

    1983-01-01

    A catalog of energy management models for heavy duty transport systems powered by diesel engines is presented. The catalog results from a literature survey, supplemented by telephone interviews and mailed questionnaires to discover the major computer models currently used in the transportation industry in the following categories: heavy duty transport systems, which consist of highway (vehicle simulation), marine (ship simulation), rail (locomotive simulation), and pipeline (pumping station simulation); and heavy duty diesel engines, which involve models that match the intake/exhaust system to the engine, fuel efficiency, emissions, combustion chamber shape, fuel injection system, heat transfer, intake/exhaust system, operating performance, and waste heat utilization devices, i.e., turbocharger, bottoming cycle.

  15. 76 FR 29333 - Pipeline Safety: Meetings of the Technical Pipeline Safety Standards Committee and the Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-20

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... Technical Hazardous Liquid Pipeline Safety Standards Committee AGENCY: Pipeline and Hazardous Materials... for natural gas pipelines and for hazardous liquid pipelines. Both committees were established under...

  16. 77 FR 34123 - Pipeline Safety: Public Meeting on Integrity Management of Gas Distribution Pipelines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-08

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2012-0100] Pipeline Safety: Public Meeting on Integrity Management of Gas Distribution Pipelines AGENCY: Office of Pipeline Safety, Pipeline and Hazardous Materials Safety Administration, DOT. ACTION...

  17. 76 FR 43743 - Pipeline Safety: Meetings of the Technical Pipeline Safety Standards Committee and the Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-21

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2011-0127] Pipeline Safety: Meetings of the Technical Pipeline Safety Standards Committee and the Technical Hazardous Liquid Pipeline Safety Standards Committee AGENCY: Pipeline and Hazardous Materials...

  18. 77 FR 16471 - Pipeline Safety: Implementation of the National Registry of Pipeline and Liquefied Natural Gas...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-21

    ... Registry of Pipeline and Liquefied Natural Gas Operators AGENCY: Pipeline and Hazardous Materials Safety... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Parts... Register (75 FR 72878) titled: ``Pipeline Safety: Updates to Pipeline and Liquefied Natural Gas Reporting...

  19. Managing water and salinity with desalination, conveyance, conservation, waste-water treatment and reuse to counteract climate variability in Gaza

    NASA Astrophysics Data System (ADS)

    Rosenberg, D. E.; Aljuaidi, A. E.; Kaluarachchi, J. J.

    2009-12-01

    We include demands for water of different salinity concentrations as input parameters and decision variables in a regional hydro-economic optimization model. This specification includes separate demand functions for saline water. We then use stochastic non-linear programming to jointly identify the benefit maximizing set of infrastructure expansions, operational allocations, and use of different water quality types under climate variability. We present a detailed application for the Gaza Strip. The application considers building desalination and waste-water treatment plants and conveyance pipelines, initiating water conservation and leak reduction programs, plus allocating and transferring water of different qualities among agricultural, industrial, and urban sectors and among districts. Results show how to integrate a mix of supply enhancement, conservation, water quality improvement, and water quality management actions into a portfolio that can economically and efficiently respond to changes and uncertainties in surface and groundwater availability due to climate variability. We also show how to put drawn-down and saline Gaza aquifer water to more sustainable and economical use.

  20. Towards a carbon-negative sustainable bio-based economy.

    PubMed

    Vanholme, Bartel; Desmet, Tom; Ronsse, Frederik; Rabaey, Korneel; Van Breusegem, Frank; De Mey, Marjan; Soetaert, Wim; Boerjan, Wout

    2013-01-01

    The bio-based economy relies on sustainable, plant-derived resources for fuels, chemicals, materials, food and feed rather than on the evanescent usage of fossil resources. The cornerstone of this economy is the biorefinery, in which renewable resources are intelligently converted to a plethora of products, maximizing the valorization of the feedstocks. Innovation is a prerequisite to move a fossil-based economy toward sustainable alternatives, and the viability of the bio-based economy depends on the integration between plant (green) and industrial (white) biotechnology. Green biotechnology deals with primary production through the improvement of biomass crops, while white biotechnology deals with the conversion of biomass into products and energy. Waste streams are minimized during these processes or partly converted to biogas, which can be used to power the processing pipeline. The sustainability of this economy is guaranteed by a third technology pillar that uses thermochemical conversion to valorize waste streams and fix residual carbon as biochar in the soil, hence creating a carbon-negative cycle. These three different multidisciplinary pillars interact through the value chain of the bio-based economy.

  1. Water and wastewater minimization plan in food industries.

    PubMed

    Ganjidoust, H; Ayati, B

    2002-01-01

    Iran is one of the countries located in a dry and semi-dry area. Many provinces like Tehran are facing problems in recent years because of less precipitation. For reduction in wastewater treatment cost and water consumption, many research works have been carried out. One of them concerns food industries group, which consumes a great amount of water in different units. For example, in beverage industries, washing of glass bottles seven times requires large amounts of water but use of plastic bottles can reduce water consumption. Another problem is leakage from pipelines, valves, etc. Their repair plays an important role in the wastage of water. The non-polluted wasted water can be used in washing halls, watering green yards, recycling to the process or reusing in cooling towers. In this paper, after a short review of waste minimization plans in food industries, problems concerning water consuming and wastewater producing units in three Iranian food industries have been investigated. At the end, some suggestions have been given for implementing the water and wastewater minimization plan in the companies.

  2. Towards a carbon-negative sustainable bio-based economy

    PubMed Central

    Vanholme, Bartel; Desmet, Tom; Ronsse, Frederik; Rabaey, Korneel; Breusegem, Frank Van; Mey, Marjan De; Soetaert, Wim; Boerjan, Wout

    2013-01-01

    The bio-based economy relies on sustainable, plant-derived resources for fuels, chemicals, materials, food and feed rather than on the evanescent usage of fossil resources. The cornerstone of this economy is the biorefinery, in which renewable resources are intelligently converted to a plethora of products, maximizing the valorization of the feedstocks. Innovation is a prerequisite to move a fossil-based economy toward sustainable alternatives, and the viability of the bio-based economy depends on the integration between plant (green) and industrial (white) biotechnology. Green biotechnology deals with primary production through the improvement of biomass crops, while white biotechnology deals with the conversion of biomass into products and energy. Waste streams are minimized during these processes or partly converted to biogas, which can be used to power the processing pipeline. The sustainability of this economy is guaranteed by a third technology pillar that uses thermochemical conversion to valorize waste streams and fix residual carbon as biochar in the soil, hence creating a carbon-negative cycle. These three different multidisciplinary pillars interact through the value chain of the bio-based economy. PMID:23761802

  3. 75 FR 13644 - TORP Terminal LP, Bienville Offshore Energy Terminal Liquefied Natural Gas Deepwater Port License...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-22

    ... interconnect pipelines to four existing offshore pipelines (Dauphin Natural Gas Pipeline, Williams Natural Gas Pipeline, Destin Natural Gas Pipeline, and Viosca Knoll Gathering System [VKGS] Gas Pipeline) that connect to the onshore natural gas transmission pipeline system. Natural gas would be delivered to customers...

  4. Freight pipelines: Current status and anticipated future use

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-07-01

    This report is issued by the Task Committee on Freight Pipelines, Pipeline Division, ASCE. Freight pipelines of various types (including slurry pipeline, pneumatic pipeline, and capsule pipeline) have been used throughout the world for over a century for transporting solid and sometimes even package products. Recent advancements in pipeline technology, aided by advanced computer control systems and trenchless technologies, have greatly facilitated the transportation of solids by pipelines. Today, in many situations, freight pipelines are not only the most economical and practical means for transporting solids, they are also the most reliable, safest and most environmentally friendly transportation mode. Increasedmore » use of underground pipelines to transport freight is anticipated in the future, especially as the technology continues to improve and surface transportation modes such as highways become more congested. This paper describes the state of the art and expected future uses of various types of freight pipelines. Obstacles hindering the development and use of the most advanced freight pipeline systems, such as the pneumatic capsule pipeline for interstate transport of freight, are discussed.« less

  5. 77 FR 37661 - Amended Notice of Intent To Prepare the Environmental Impact Statement for a Proposed Federal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-22

    ... natural gas pipelines, the Midwestern Gas Transmission line (3 miles distant) and/or the ANR Pipeline (4.5... Pipeline, Boardwalk/Texas Gas Pipeline, Shell/Capline Oil Pipeline, Panhandle/Trunkline Gas Pipeline, and... Rockport, IN, and CO 2 Pipeline; Conduct Additional Public Scoping Meetings; and Issue a Notice of...

  6. Capsule injection system for a hydraulic capsule pipelining system

    DOEpatents

    Liu, Henry

    1982-01-01

    An injection system for injecting capsules into a hydraulic capsule pipelining system, the pipelining system comprising a pipeline adapted for flow of a carrier liquid therethrough, and capsules adapted to be transported through the pipeline by the carrier liquid flowing through the pipeline. The injection system comprises a reservoir of carrier liquid, the pipeline extending within the reservoir and extending downstream out of the reservoir, and a magazine in the reservoir for holding capsules in a series, one above another, for injection into the pipeline in the reservoir. The magazine has a lower end in communication with the pipeline in the reservoir for delivery of capsules from the magazine into the pipeline.

  7. Observational Approach to Chromium Site Remediation - 13266

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Scott Myers, R.

    2013-07-01

    Production reactors at the U.S. Department of Energy's (DOE) Hanford Site in Richland, Washington, required massive quantities of water for reactor cooling and material processing. To reduce corrosion and the build-up of scale in pipelines and cooling systems, sodium dichromate was added to the water feedstock. Spills and other releases at the makeup facilities, as well as leaks from miles of pipelines, have led to numerous areas with chromium-contaminated soil and groundwater, threatening fish populations in the nearby Columbia River. Pump-and-treat systems have been installed to remove chromium from the groundwater, but significant contamination remain in the soil column andmore » poses a continuing threat to groundwater and the Columbia River. Washington Closure Hanford, DOE, and regulators are working on a team approach that implements the observational approach, a strategy for effectively dealing with the uncertainties inherent in subsurface conditions. Remediation of large, complex waste sites at a federal facility is a daunting effort. It is particularly difficult to perform the work in an environment of rapid response to changing field and contamination conditions. The observational approach, developed by geotechnical engineers to accommodate the inherent uncertainties in subsurface conditions, is a powerful and appropriate method for site remediation. It offers a structured means of quickly moving into full remediation and responding to the variations and changing conditions inherent in waste site cleanups. A number of significant factors, however, complicate the application of the observational approach for chromium site remediation. Conceptual models of contamination and site conditions are difficult to establish and get consensus on. Mid-stream revisions to the design of large excavations are time-consuming and costly. And regulatory constraints and contract performance incentives can be impediments to the flexible responses required under the observational approach. The WCH project team is working closely with stakeholders and taking a number of steps to meet these challenges in a continuing effort to remediate chromium contaminated soil in an efficient and cost-effective manner. (authors)« less

  8. Turning community wastes into sustainable geothermal energy: The S.E. Geysers effluent pipeline project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dellinger, M.; Allen, E.

    A unique public/private partnership of local, state, federal, and corporate stakeholders are constructing the world`s first wastewater-to-electricity system at The Geysers. A rare example of a genuinely {open_quotes}sustainable{close_quote} energy system, three Lake County communities will recycle their treated wastewater effluent through the southeast portion of The Geysers steamfield to produce approximately 625,000 MWh annually from six existing geothermal power plants. In effect, the communities` effluent will produce enough power to indefinitely sustain their electric needs, along with enough extra power for thousands of other California consumers. Because of the project`s unique sponsorship, function, and environmental impacts, its implementation has required:more » (1) preparation of a consolidated state environmental impact report (EIR) and federal environmental impact statement (EIS), and seven related environmental agreements and management plans; (2) acquisition of 25 local, state, and federal permits; (3) negotiation of six federal and state financial assistance agreements; (4) negotiation of six participant agreements on construction, operation, and financing of the project; and (5) acquisition of 163 easements from private land owners for pipeline construction access and ongoing maintenance. The project`s success in efficiently and economically completing these requirements is a model for geothermal innovation and partnering throughout the Pacific Rim and elsewhere internationally.« less

  9. Heat Pipe-Assisted Thermoelectric Power Generation Technology for Waste Heat Recovery

    NASA Astrophysics Data System (ADS)

    Jang, Ju-Chan; Chi, Ri-Guang; Rhi, Seok-Ho; Lee, Kye-Bock; Hwang, Hyun-Chang; Lee, Ji-Su; Lee, Wook-Hyun

    2015-06-01

    Currently, large amounts of thermal energy dissipated from automobiles are emitted through hot exhaust pipes. This has resulted in the need for a new efficient recycling method to recover energy from waste hot exhaust gas. The present experimental study investigated how to improve the power output of a thermoelectric generator (TEG) system assisted by a wickless loop heat pipe (loop thermosyphon) under the limited space of the exhaust gas pipeline. The present study shows a novel loop-type heat pipe-assisted TEG concept to be applied to hybrid vehicles. The operating temperature of a TEG's hot side surface should be as high as possible to maximize the Seebeck effect. The present study shows a novel TEG concept of transferring heat from the source to the sink. This technology can transfer waste heat to any local place with a loop-type heat pipe. The present TEG system with a heat pipe can transfer heat and generate an electromotive force power of around 1.3 V in the case of 170°C hot exhaust gas. Two thermoelectric modules (TEMs) for a conductive block model and four Bi2Te3 TEMs with a heat pipe-assisted model were installed in the condenser section. Heat flows to the condenser section from the evaporator section connected to the exhaust pipe. This novel TEG system with a heat pipe can be placed in any location on an automobile.

  10. Mineral dissolution and secondary precipitation on quartz sand in simulated Hanford tank solutions affecting subsurface porosity

    NASA Astrophysics Data System (ADS)

    Wang, Guohui; Um, Wooyong

    2012-11-01

    Highly alkaline nuclear waste solutions have been released from underground nuclear waste storage tanks and pipelines into the vadose zone at the US Department of Energy's Hanford Site in Washington, causing mineral dissolution and re-precipitation upon contact with subsurface sediments. High pH caustic NaNO3 solutions with and without dissolved Al were reacted with quartz sand through flow-through columns stepwise at 45, 51, and 89 °C to simulate possible reactions between leaked nuclear waste solution and primary subsurface mineral. Upon reaction, Si was released from the dissolution of quartz sand, and nitrate-cancrinite [Na8Si6Al6O24(NO3)2] precipitated on the quartz surface as a secondary mineral phase. Both steady-state dissolution and precipitation kinetics were quantified, and quartz dissolution apparent activation energy was determined. Mineral alteration through dissolution and precipitation processes results in pore volume and structure changes in the subsurface porous media. In this study, the column porosity increased up to 40.3% in the pure dissolution column when no dissolved Al was present in the leachate, whereas up to a 26.5% porosity decrease was found in columns where both dissolution and precipitation were observed because of the presence of Al in the input solution. The porosity change was also confirmed by calculation using the dissolution and precipitation rates and mineral volume changes.

  11. 76 FR 73570 - Pipeline Safety: Miscellaneous Changes to Pipeline Safety Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... pipeline facilities to facilitate the removal of liquids and other materials from the gas stream. These... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Parts... Changes to Pipeline Safety Regulations AGENCY: Pipeline and Hazardous Materials Safety Administration...

  12. Development and Applications of Pipeline Steel in Long-Distance Gas Pipeline of China

    NASA Astrophysics Data System (ADS)

    Chunyong, Huo; Yang, Li; Lingkang, Ji

    In past decades, with widely utilizing of Microalloying and Thermal Mechanical Control Processing (TMCP) technology, the good matching of strength, toughness, plasticity and weldability on pipeline steel has been reached so that oil and gas pipeline has been greatly developed in China to meet the demand of strong domestic consumption of energy. In this paper, development history of pipeline steel and gas pipeline in china is briefly reviewed. The microstructure characteristic and mechanical performance of pipeline steel used in some representative gas pipelines of china built in different stage are summarized. Through the analysis on the evolution of pipeline service environment, some prospective development trend of application of pipeline steel in China is also presented.

  13. 75 FR 63774 - Pipeline Safety: Safety of On-Shore Hazardous Liquid Pipelines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-18

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part... Pipelines AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), Department of... Gas Pipeline Safety Act of 1968, Public Law 90-481, delegated to DOT the authority to develop...

  14. 49 CFR 195.210 - Pipeline location.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Pipeline location. 195.210 Section 195.210 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY... PIPELINE Construction § 195.210 Pipeline location. (a) Pipeline right-of-way must be selected to avoid, as...

  15. 75 FR 5244 - Pipeline Safety: Integrity Management Program for Gas Distribution Pipelines; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-02

    ... Management Program for Gas Distribution Pipelines; Correction AGENCY: Pipeline and Hazardous Materials Safety... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part... Regulations to require operators of gas distribution pipelines to develop and implement integrity management...

  16. 77 FR 61825 - Pipeline Safety: Notice of Public Meeting on Pipeline Data

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-11

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID... program performance measures for gas distribution, gas transmission, and hazardous liquids pipelines. The... distribution pipelines (49 CFR 192.1007(e)), gas transmission pipelines (49 CFR 192.945) and hazardous liquids...

  17. 78 FR 41991 - Pipeline Safety: Potential for Damage to Pipeline Facilities Caused by Flooding

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-12

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No...: Pipeline and Hazardous Materials Safety Administration (PHMSA); DOT. ACTION: Notice; Issuance of Advisory... Gas and Hazardous Liquid Pipeline Systems. Subject: Potential for Damage to Pipeline Facilities Caused...

  18. 78 FR 41496 - Pipeline Safety: Meetings of the Gas and Liquid Pipeline Advisory Committees

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-10

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2013-0156] Pipeline Safety: Meetings of the Gas and Liquid Pipeline Advisory Committees AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: Notice of advisory committee...

  19. 76 FR 70953 - Pipeline Safety: Safety of Gas Transmission Pipelines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-16

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part 192 [Docket ID PHMSA-2011-0023] RIN 2137-AE72 Pipeline Safety: Safety of Gas Transmission Pipelines AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA); DOT. ACTION: Advance notice of...

  20. 77 FR 2126 - Pipeline Safety: Implementation of the National Registry of Pipeline and Liquefied Natural Gas...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-13

    ... Natural Gas Operators AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No...: ``Pipeline Safety: Updates to Pipeline and Liquefied Natural Gas Reporting Requirements.'' The final rule...

  1. 76 FR 303 - Pipeline Safety: Safety of On-Shore Hazardous Liquid Pipelines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-04

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part 195 [Docket ID PHMSA-2010-0229] RIN 2137-AE66 Pipeline Safety: Safety of On-Shore Hazardous Liquid Pipelines AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: Notice of...

  2. 78 FR 13075 - Intent To Request Renewal From OMB of One Current Public Collection of Information: Pipeline...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-26

    ... From OMB of One Current Public Collection of Information: Pipeline Corporate Security Review Program... current security practices in the pipeline industry by way of TSA's Pipeline Corporate Security Review... Collection Requirement The TSA Pipeline Security Branch is responsible for conducting Pipeline Corporate...

  3. 78 FR 42889 - Pipeline Safety: Reminder of Requirements for Utility LP-Gas and LPG Pipeline Systems

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-18

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part 192 [Docket No. PHMSA-2013-0097] Pipeline Safety: Reminder of Requirements for Utility LP-Gas and LPG Pipeline Systems AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION...

  4. 30 CFR 250.1005 - Inspection requirements for DOI pipelines.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 2 2011-07-01 2011-07-01 false Inspection requirements for DOI pipelines. 250.1005 Section 250.1005 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION, AND ENFORCEMENT... Pipelines and Pipeline Rights-of-Way § 250.1005 Inspection requirements for DOI pipelines. (a) Pipeline...

  5. PipelineDog: a simple and flexible graphic pipeline construction and maintenance tool.

    PubMed

    Zhou, Anbo; Zhang, Yeting; Sun, Yazhou; Xing, Jinchuan

    2018-05-01

    Analysis pipelines are an essential part of bioinformatics research, and ad hoc pipelines are frequently created by researchers for prototyping and proof-of-concept purposes. However, most existing pipeline management system or workflow engines are too complex for rapid prototyping or learning the pipeline concept. A lightweight, user-friendly and flexible solution is thus desirable. In this study, we developed a new pipeline construction and maintenance tool, PipelineDog. This is a web-based integrated development environment with a modern web graphical user interface. It offers cross-platform compatibility, project management capabilities, code formatting and error checking functions and an online repository. It uses an easy-to-read/write script system that encourages code reuse. With the online repository, it also encourages sharing of pipelines, which enhances analysis reproducibility and accountability. For most users, PipelineDog requires no software installation. Overall, this web application provides a way to rapidly create and easily manage pipelines. PipelineDog web app is freely available at http://web.pipeline.dog. The command line version is available at http://www.npmjs.com/package/pipelinedog and online repository at http://repo.pipeline.dog. ysun@kean.edu or xing@biology.rutgers.edu or ysun@diagnoa.com. Supplementary data are available at Bioinformatics online.

  6. Method and system for pipeline communication

    DOEpatents

    Richardson,; John, G [Idaho Falls, ID

    2008-01-29

    A pipeline communication system and method includes a pipeline having a surface extending along at least a portion of the length of the pipeline. A conductive bus is formed to and extends along a portion of the surface of the pipeline. The conductive bus includes a first conductive trace and a second conductive trace with the first and second conductive traces being adapted to conformally couple with a pipeline at the surface extending along at least a portion of the length of the pipeline. A transmitter for sending information along the conductive bus on the pipeline is coupled thereto and a receiver for receiving the information from the conductive bus on the pipeline is also couple to the conductive bus.

  7. 76 FR 75894 - Information Collection Activities: Pipelines and Pipeline Rights-of-Way; Submitted for Office of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-05

    ... pipelines `` * * * for the transportation of oil, natural gas, sulphur, or other minerals, or under such...) Submit repair report 3 1008(f) Submit report of pipeline failure analysis...... 30 1008(g) Submit plan of.... BSEE-2011-0002; OMB Control Number 1010-0050] Information Collection Activities: Pipelines and Pipeline...

  8. 76 FR 620 - Notice of Receipt of Application for a Presidential Permit To Operate and Maintain Pipeline...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-05

    ... Corporation (``Dome Pipeline''). These pipelines carry, or are permitted to carry, liquefied hydrocarbons...) additional pipelines to carry liquefied hydrocarbons. According to the application, all four (4) pipelines... hydrocarbons under pressure and that the remaining two pipelines are being held in reserve to be used in the...

  9. 77 FR 16052 - Information Collection Activities: Pipelines and Pipeline Rights-of-Way; Submitted for Office of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-19

    ... submerged lands of the OCS for pipelines ``* * * for the transportation of oil, natural gas, sulphur, or... ensure that the pipeline, as constructed, will provide for safe transportation of oil and gas and other...-0002; OMB Control Number 1014-0016] Information Collection Activities: Pipelines and Pipeline Rights...

  10. 78 FR 53190 - Pipeline Safety: Notice to Operators of Hazardous Liquid and Natural Gas Pipelines of a Recall on...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-28

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2013-0185] Pipeline Safety: Notice to Operators of Hazardous Liquid and Natural Gas Pipelines of a Recall on Leak Repair Clamps Due to Defective Seal AGENCY: Pipeline and Hazardous Materials Safety...

  11. 75 FR 24633 - Order Finding That the ICE Chicago Financial Basis Contract Traded on the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-05

    ... Pipe Line, LLC, serves as a juncture for 13 different pipelines. These pipelines bring in natural gas... ``hub'' refers to a juncture where two or more natural gas pipelines are connected. Hubs also serve as... interstate pipelines. The firms that service the Chicago area are ANR Pipeline Company, Natural Gas Pipeline...

  12. Using industry ROV videos to assess fish associations with subsea pipelines

    NASA Astrophysics Data System (ADS)

    McLean, D. L.; Partridge, J. C.; Bond, T.; Birt, M. J.; Bornt, K. R.; Langlois, T. J.

    2017-06-01

    Remote Operated Vehicles are routinely used to undertake inspection and maintenance activities of underwater pipelines in north-west Australia. In doing so, many terabytes of geo-referenced underwater video are collected at depths, and on a scale usually unobtainable for ecological research. We assessed fish diversity and abundance from existing ROV videos collected along 2-3 km sections of two pipelines in north-west Australia, one at 60-80 m water depth and the other at 120-130 m. A total of 5962 individual fish from 92 species and 42 families were observed. Both pipelines were characterised by a high abundance of commercially important fishes including: snappers (Lutjanidae) and groupers (Epinephelidae). The presence of thousands of unidentifiable larval fish, in addition to juveniles, sub-adults and adults suggests that the pipelines may be enhancing, rather than simply attracting, fish stocks. The prevalence and high complexity of sponges on the shallower pipeline and of deepwater corals on the deeper pipeline had a strong positive correlation with the fish abundance. These habitats likely offer a significant food source and refuge for fish, but also for invertebrates upon which fish feed. A greater diversity on the shallower pipeline, and a higher abundance of fishes on both pipelines, were associated with unsupported pipeline sections (spans) and many species appeared to be utilising pipeline spans as refuges. This study is a first look at the potential value of subsea pipelines for fishes on the north-west shelf. While the results suggest that these sections of pipeline appear to offer significant habitat that supports diverse and important commercially fished species, further work, including off-pipeline surveys on the natural seafloor, are required to determine conclusively the ecological value of pipelines and thereby inform discussions regarding the ecological implications of pipeline decommissioning.

  13. A reconfigurable, wearable, wireless ECG system.

    PubMed

    Borromeo, S; Rodriguez-Sanchez, C; Machado, F; Hernandez-Tamames, J A; de la Prieta, R

    2007-01-01

    New emerging concepts as "wireless hospital", "mobile healthcare" or "wearable telemonitoring" require the development of bio-signal acquisition devices to be easily integrated into the clinical routine. In this work, we present a new system for Electrocardiogram (ECG) acquisition and its processing, with wireless transmission on demand (either the complete ECG or only one alarm message, just in case a pathological heart rate detected). Size and power consumption are optimized in order to provide mobility and comfort to the patient. We have designed a modular hardware system and an autonomous platform based on a Field-Programmable Gate Array (FPGA) for developing and debugging. The modular approach allows to redesign the system in an easy way. Its adaptation to a new biomedical signal would only need small changes on it. The hardware system is composed of three layers that can be plugged/unplugged: communication layer, processing layer and sensor layer. In addition, we also present a general purpose end-user application developed for mobile phones or Personal Digital Assistant devices (PDAs).

  14. 78 FR 46560 - Pipeline Safety: Class Location Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-01

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part... class location requirements for gas transmission pipelines. Section 5 of the Pipeline Safety, Regulatory... and, with respect to gas transmission pipeline facilities, whether applying IMP requirements to...

  15. 77 FR 27279 - Pipeline Safety: Information Collection Activities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-09

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... collections relate to the pipeline integrity management requirements for gas transmission pipeline operators... Management in High Consequence Areas Gas Transmission Pipeline Operators. OMB Control Number: 2137-0610...

  16. 75 FR 53733 - Pipeline Safety: Information Collection Activities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-01

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2010-0246] Pipeline Safety: Information Collection Activities AGENCY: Pipeline and Hazardous... liquefied natural gas, hazardous liquid, and gas transmission pipeline systems operated by a company. The...

  17. 77 FR 15453 - Pipeline Safety: Information Collection Activities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-15

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... information collection titled, ``Gas Pipeline Safety Program Certification and Hazardous Liquid Pipeline... collection request that PHMSA will be submitting to OMB for renewal titled, ``Gas Pipeline Safety Program...

  18. 77 FR 46155 - Pipeline Safety: Information Collection Activities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-02

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... collections relate to the pipeline integrity management requirements for gas transmission pipeline operators... Management in High Consequence Areas Gas Transmission Pipeline Operators. OMB Control Number: 2137-0610...

  19. 75 FR 43612 - Pipeline Safety: Request for Special Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-26

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2010-0042] Pipeline Safety: Request for Special Permit AGENCY: Pipeline and Hazardous Materials..., Inc., a natural gas pipeline operator, seeking relief from compliance with certain requirements in the...

  20. 78 FR 52820 - Pipeline Safety: Request for Special Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-26

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2013-0181] Pipeline Safety: Request for Special Permit AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA); DOT. ACTION: Notice. SUMMARY: Pursuant to the Federal pipeline safety laws...

  1. 75 FR 13342 - Pipeline Safety: Workshop on Distribution Pipeline Construction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-19

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID... natural gas distribution construction. Natural gas distribution pipelines are subject to a unique subset... distribution pipeline construction practices. This workshop will focus solely on natural gas distribution...

  2. 78 FR 52821 - Pipeline Safety: Request for Special Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-26

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2013-0146] Pipeline Safety: Request for Special Permit AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA); DOT. ACTION: Notice. SUMMARY: Pursuant to the Federal pipeline safety laws...

  3. 77 FR 34458 - Pipeline Safety: Requests for Special Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2012-0112] Pipeline Safety: Requests for Special Permit AGENCY: Pipeline and Hazardous Materials... BreitBurn Energy Company LP, two natural gas pipeline operators, seeking relief from compliance with...

  4. 75 FR 66425 - Pipeline Safety: Request for Special Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-28

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2010-0124] Pipeline Safety: Request for Special Permit AGENCY: Pipeline and Hazardous Materials... Company, LP, a natural gas pipeline operator, seeking relief from compliance with certain requirements in...

  5. 77 FR 73637 - Alliance Pipeline L.P.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-11

    ... Pipeline L.P.; Notice of Application Take notice that on November 26, 2012, Alliance Pipeline L.P..., Manager, Regulatory Affairs, Alliance Pipeline Ltd. on behalf of Alliance Pipeline L.P., 800, 605-5 Ave...] BILLING CODE 6717-01-P ...

  6. 49 CFR 192.951 - Where does an operator file a report?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Gas Transmission Pipeline... Pipeline Safety, Pipeline and Hazardous Materials Safety Administration, U.S. Department of Transportation...

  7. 78 FR 5866 - Pipeline Safety: Annual Reports and Validation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-28

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID PHMSA-2012-0319] Pipeline Safety: Annual Reports and Validation AGENCY: Pipeline and Hazardous Materials... 2012 gas transmission and gathering annual reports, remind pipeline owners and operators to validate...

  8. 77 FR 51848 - Pipeline Safety: Information Collection Activities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-27

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... Program for Gas Distribution Pipelines. DATES: Interested persons are invited to submit comments on or.... These regulations require operators of hazardous liquid pipelines and gas pipelines to develop and...

  9. 77 FR 26822 - Pipeline Safety: Verification of Records

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-07

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2012-0068] Pipeline Safety: Verification of Records AGENCY: Pipeline and Hazardous Materials... issuing an Advisory Bulletin to remind operators of gas and hazardous liquid pipeline facilities to verify...

  10. 77 FR 74275 - Pipeline Safety: Information Collection Activities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-13

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No.... These regulations require operators of hazardous liquid pipelines and gas pipelines to develop and... control room. Affected Public: Operators of both natural gas and hazardous liquid pipeline systems. Annual...

  11. ALMA Pipeline: Current Status

    NASA Astrophysics Data System (ADS)

    Shinnaga, H.; Humphreys, E.; Indebetouw, R.; Villard, E.; Kern, J.; Davis, L.; Miura, R. E.; Nakazato, T.; Sugimoto, K.; Kosugi, G.; Akiyama, E.; Muders, D.; Wyrowski, F.; Williams, S.; Lightfoot, J.; Kent, B.; Momjian, E.; Hunter, T.; ALMA Pipeline Team

    2015-12-01

    The ALMA Pipeline is the automated data reduction tool that runs on ALMA data. Current version of the ALMA pipeline produces science quality data products for standard interferometric observing modes up to calibration process. The ALMA Pipeline is comprised of (1) heuristics in the form of Python scripts that select the best processing parameters, and (2) contexts that are given for book-keeping purpose of data processes. The ALMA Pipeline produces a "weblog" that showcases detailed plots for users to judge how each step of calibration processes are treated. The ALMA Interferometric Pipeline was conditionally accepted in March 2014 by processing Cycle 0 and Cycle 1 data sets. From Cycle 2, ALMA Pipeline is used for ALMA data reduction and quality assurance for the projects whose observing modes are supported by the ALMA Pipeline. Pipeline tasks are available based on CASA version 4.2.2, and the first public pipeline release called CASA 4.2.2-pipe has been available since October 2014. One can reduce ALMA data both by CASA tasks as well as by pipeline tasks by using CASA version 4.2.2-pipe.

  12. Deep Submarine Tailings Disposal (DSTP) the Proposed Use of Submarine Canyons and Artificial Turbidity Currents for the Disposal of Mine Waste: Current Practice, Future Plans, and Cumulative Impacts.

    NASA Astrophysics Data System (ADS)

    Young, R.; Moran, R.

    2015-12-01

    The wastes from mining operations ( tailings) have been disposed of in the fluvial environment (riverine disposal) and in nearshore marine environments for much of the last century. The scale of modern mining operations has led to increasing use of steep slopes and submarine canyons for deposition of these wastes at depths of 2000m - 4000m. Current mine disposal operations in Indonesia and Papua New Guinea which use Deep Sea Tailings Placement (DSTP) release volumes between 5000 tpd and 160,000 tpd. Planning is underway by the"Consortium," an industry and government group in Chile which would deposit mine waste of 1M tpd into the Humbolt Current Large Marine Ecosystem (HCLME) which provides nearly 20% of the fish biomass harvested on a sustainable basis worldwide. Underwater pipelines discharge tailings as a slurry to create a continuous artificial turbidity current with particle size distribtions (PSD's) ranging from sand to clay sized fractions. Potential problems arise from benthic smothering, angular particulate uptake by benthic organisms, and from the bioaccumulation of a complex of heavy metals by both benthic and pelagic species. While much is known about the binding of copper and other toxic heavy metals in a reducing environment, little has been done to consider the implications of ocean dumping where 1% of tailings discharged may consist of unrecovered heavy metals. Synergistic cumulative impacts to just the HCLME from the dumping of the more than 3M tpy of reactive metals in these tailings sediments remains unknown and poses substantial risks. DSTP assumes a stable deep sea depositional environment but upwelling currents and plume shear may make this hard to accomplish.

  13. 78 FR 65429 - Pipeline Safety: Request for Special Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-31

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2010-0041] Pipeline Safety: Request for Special Permit AGENCY: Pipeline and Hazardous Materials...-0041 Williams Gas Pipeline 49 CFR 192.150........ To authorize the extension Company, LLC (WGP). of a...

  14. 49 CFR 192.620 - Alternative maximum allowable operating pressure for certain steel pipelines.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY...) At points where gas with potentially deleterious contaminants enters the pipeline, use filter...

  15. 77 FR 58616 - Pipeline Safety: Information Collection Activities, Revision to Gas Transmission and Gathering...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-21

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2012-0024] Pipeline Safety: Information Collection Activities, Revision to Gas Transmission and Gathering Pipeline Systems Annual Report, Gas Transmission and Gathering Pipeline Systems Incident Report...

  16. 78 FR 14877 - Pipeline Safety: Incident and Accident Reports

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-07

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID PHMSA-2013-0028] Pipeline Safety: Incident and Accident Reports AGENCY: Pipeline and Hazardous Materials... PHMSA F 7100.2--Incident Report--Natural and Other Gas Transmission and Gathering Pipeline Systems and...

  17. 75 FR 4136 - Pipeline Safety: Request To Modify Special Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-26

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2009-0377] Pipeline Safety: Request To Modify Special Permit AGENCY: Pipeline and Hazardous... coating on its gas pipeline. DATES: Submit any comments regarding this special permit modification request...

  18. 75 FR 73160 - Pipeline Safety: Information Collection Activities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-29

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No...-Related Conditions on Gas, Hazardous Liquid, and Carbon Dioxide Pipelines and Liquefied Natural Gas... Pipelines and Liquefied Natural Gas Facilities.'' The Pipeline Safety Laws (49 U.S.C. 60132) require each...

  19. 75 FR 9018 - Pipeline Safety: Random Drug Testing Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-26

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID PHMSA-2010-0034] Pipeline Safety: Random Drug Testing Rate AGENCY: Pipeline and Hazardous Materials... pipelines and operators of liquefied natural gas facilities must select and test a percentage of covered...

  20. 77 FR 2606 - Pipeline Safety: Random Drug Testing Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-18

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID PHMSA-2012-0004] Pipeline Safety: Random Drug Testing Rate AGENCY: Pipeline and Hazardous Materials... pipelines and operators of liquefied natural gas facilities must select and test a percentage of covered...

  1. 75 FR 45591 - Pipeline Safety: Notice of Technical Pipeline Safety Advisory Committee Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-03

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part... Committee Meetings AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA); DOT. ACTION... safety standards, risk assessments, and safety policies for natural gas pipelines and for hazardous...

  2. Numerical research on the lateral global buckling characteristics of a high temperature and pressure pipeline with two initial imperfections

    PubMed Central

    Liu, Wenbin; Liu, Aimin

    2018-01-01

    With the exploitation of offshore oil and gas gradually moving to deep water, higher temperature differences and pressure differences are applied to the pipeline system, making the global buckling of the pipeline more serious. For unburied deep-water pipelines, the lateral buckling is the major buckling form. The initial imperfections widely exist in the pipeline system due to manufacture defects or the influence of uneven seabed, and the distribution and geometry features of initial imperfections are random. They can be divided into two kinds based on shape: single-arch imperfections and double-arch imperfections. This paper analyzed the global buckling process of a pipeline with 2 initial imperfections by using a numerical simulation method and revealed how the ratio of the initial imperfection’s space length to the imperfection’s wavelength and the combination of imperfections affects the buckling process. The results show that a pipeline with 2 initial imperfections may suffer the superposition of global buckling. The growth ratios of buckling displacement, axial force and bending moment in the superposition zone are several times larger than no buckling superposition pipeline. The ratio of the initial imperfection’s space length to the imperfection’s wavelength decides whether a pipeline suffers buckling superposition. The potential failure point of pipeline exhibiting buckling superposition is as same as the no buckling superposition pipeline, but the failure risk of pipeline exhibiting buckling superposition is much higher. The shape and direction of two nearby imperfections also affects the failure risk of pipeline exhibiting global buckling superposition. The failure risk of pipeline with two double-arch imperfections is higher than pipeline with two single-arch imperfections. PMID:29554123

  3. 49 CFR 192.903 - What definitions apply to this subpart?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Gas Transmission Pipeline... pipeline segment means a segment of gas transmission pipeline located in a high consequence area. The terms...

  4. 76 FR 11853 - Pipeline Safety: Request for Special Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-03

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2011-0027] Pipeline Safety: Request for Special Permit AGENCY: Pipeline and Hazardous Materials... a 24-inch mainline natural gas pipeline, 595 feet in length. The first segment of the special permit...

  5. 75 FR 72877 - Pipeline Safety: Updates to Pipeline and Liquefied Natural Gas Reporting Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-26

    ... liquid pipelines, and liquefied natural gas (LNG) facilities. These revisions will enhance PHMSA's... of natural gas pipelines, hazardous liquid pipelines, and LNG facilities. Specifically, PHMSA... commodity transported, and type of commodity transported. 8. Modify hazardous liquid operator telephonic...

  6. 77 FR 7572 - Alliance Pipeline L.P.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-13

    ...] Alliance Pipeline L.P.; Notice of Application Take notice that on January 25, 2012, Alliance Pipeline L.P... Pipeline Inc., Managing General Partner of Alliance Pipeline L.P., 800, 605--5 Ave. SW., Calgary, Alberta...; 8:45 am] BILLING CODE 6717-01-P ...

  7. 78 FR 65427 - Pipeline Safety: Reminder of Requirements for Liquefied Petroleum Gas and Utility Liquefied...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-31

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2013-0097] Pipeline Safety: Reminder of Requirements for Liquefied Petroleum Gas and Utility Liquefied Petroleum Gas Pipeline Systems AGENCY: Pipeline and Hazardous Materials Safety Administration...

  8. Thinking on Sichuan-Chongqing gas pipeline transportation system reform under market-oriented conditions

    NASA Astrophysics Data System (ADS)

    Duan, Yanzhi

    2017-01-01

    The gas pipeline networks in Sichuan and Chongqing (Sichuan-Chongqing) region have formed a fully-fledged gas pipeline transportation system in China, which supports and promotes the rapid development of gas market in Sichuan-Chongqing region. In the circumstances of further developed market-oriented economy, it is necessary to carry out further the pipeline system reform in the areas of investment/financing system, operation system and pricing system to lay a solid foundation for improving future gas production and marketing capability and adapting itself to the national gas system reform, and to achieve the objectives of multiparty participated pipeline construction, improved pipeline transportation efficiency and fair and rational pipeline transportation prices. In this article, main thinking on reform in the three areas and major deployment are addressed, and corresponding measures on developing shared pipeline economy, providing financial support to pipeline construction, setting up independent regulatory agency to enhance the industrial supervision for gas pipeline transportation, and promoting the construction of regional gas trade market are recommended.

  9. 49 CFR 195.401 - General requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... this part: (1) An interstate pipeline, other than a low-stress pipeline, on which construction was..., other than a low-stress pipeline, on which construction was begun after July 31, 1977, that transports hazardous liquid. (3) An intrastate pipeline, other than a low-stress pipeline, on which construction was...

  10. 49 CFR 192.717 - Transmission lines: Permanent field repair of leaks.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Maintenance... pipe in size. (4) If the leak is on a submerged offshore pipeline or submerged pipeline in inland...

  11. 76 FR 21423 - Pipeline Safety: Request for Special Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-15

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2011-0063] Pipeline Safety: Request for Special Permit AGENCY: Pipeline and Hazardous Materials... application is for two 30-inch segments, segments 3 and 4, of the TPL 330 natural gas pipeline located in St...

  12. 77 FR 19414 - Pipeline Safety: Public Comment on Leak and Valve Studies Mandated by the Pipeline Safety...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-30

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID... Safety, Regulatory Certainty, and Job Creation Act of 2011 AGENCY: Pipeline and Hazardous Materials... Transportation (DOT), Pipeline and Hazardous Materials Safety Administration (PHMSA) is providing an important...

  13. 75 FR 35516 - Pipeline Safety: Request for Special Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-22

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2010-0147] Pipeline Safety: Request for Special Permit AGENCY: Pipeline and Hazardous Materials... with the Class 1 location portion of a 7.4 mile natural gas pipeline to be constructed in Alaska. This...

  14. 49 CFR 192.513 - Test requirements for plastic pipelines.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Test requirements for plastic pipelines. 192.513 Section 192.513 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND... Test requirements for plastic pipelines. (a) Each segment of a plastic pipeline must be tested in...

  15. 49 CFR 192.513 - Test requirements for plastic pipelines.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Test requirements for plastic pipelines. 192.513 Section 192.513 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND... Test requirements for plastic pipelines. (a) Each segment of a plastic pipeline must be tested in...

  16. 49 CFR 192.513 - Test requirements for plastic pipelines.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Test requirements for plastic pipelines. 192.513 Section 192.513 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND... Test requirements for plastic pipelines. (a) Each segment of a plastic pipeline must be tested in...

  17. 49 CFR 192.513 - Test requirements for plastic pipelines.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Test requirements for plastic pipelines. 192.513 Section 192.513 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND... Test requirements for plastic pipelines. (a) Each segment of a plastic pipeline must be tested in...

  18. 49 CFR 192.513 - Test requirements for plastic pipelines.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Test requirements for plastic pipelines. 192.513 Section 192.513 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND... Test requirements for plastic pipelines. (a) Each segment of a plastic pipeline must be tested in...

  19. 78 FR 38803 - Pipeline Safety: Information Collection Activities, Revisions to Incident and Annual Reports for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-27

    ... Reports for Gas Pipeline Operators AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... (OMB) Control No. 2137-0522, titled ``Incident and Annual Reports for Gas Pipeline Operators.'' PHMSA...

  20. 75 FR 5640 - Pipeline Safety: Implementation of Revised Incident/Accident Report Forms for Distribution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-03

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... Distribution Systems, Gas Transmission and Gathering Systems, and Hazardous Liquid Systems AGENCY: Pipeline and.... SUMMARY: This notice advises owners and operators of gas pipeline facilities and hazardous liquid pipeline...

  1. 75 FR 35366 - Pipeline Safety: Applying Safety Regulation to All Rural Onshore Hazardous Liquid Low-Stress Lines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-22

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part... Onshore Hazardous Liquid Low-Stress Lines AGENCY: Pipeline and Hazardous Materials Safety Administration... pipelines to perform a complete ``could affect'' analysis to determine which rural low-stress pipeline...

  2. 49 CFR 192.917 - How does an operator identify potential threats to pipeline integrity and use the threat...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Gas Transmission Pipeline Integrity Management § 192...

  3. 78 FR 71033 - Pipeline Safety: Information Collection Activities, Revisions to Incident and Annual Reports for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-27

    ... Reports for Gas Pipeline Operators AGENCY: Pipeline and Hazardous Materials Safety Administration, DOT... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... Pipeline Systems; PHMSA F 7100.2-1 Annual Report for Calendar Year 20xx Natural and Other Gas Transmission...

  4. 49 CFR 192.937 - What is a continual process of evaluation and assessment to maintain a pipeline's integrity?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Gas Transmission Pipeline Integrity Management § 192.937 What is a...

  5. 76 FR 28326 - Pipeline Safety: National Pipeline Mapping System Data Submissions and Submission Dates for Gas...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-17

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR 191... Reports AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: Issuance of... Pipeline and Hazardous Materials Safety Administration (PHMSA) published a final rule on November 26, 2010...

  6. 49 CFR 192.755 - Protecting cast-iron pipelines.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Protecting cast-iron pipelines. 192.755 Section... NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Maintenance § 192.755 Protecting cast... pipeline is disturbed: (a) That segment of the pipeline must be protected, as necessary, against damage...

  7. 49 CFR 192.755 - Protecting cast-iron pipelines.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Protecting cast-iron pipelines. 192.755 Section... NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Maintenance § 192.755 Protecting cast... pipeline is disturbed: (a) That segment of the pipeline must be protected, as necessary, against damage...

  8. 49 CFR 192.755 - Protecting cast-iron pipelines.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Protecting cast-iron pipelines. 192.755 Section... NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Maintenance § 192.755 Protecting cast... pipeline is disturbed: (a) That segment of the pipeline must be protected, as necessary, against damage...

  9. 49 CFR 192.755 - Protecting cast-iron pipelines.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Protecting cast-iron pipelines. 192.755 Section... NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Maintenance § 192.755 Protecting cast... pipeline is disturbed: (a) That segment of the pipeline must be protected, as necessary, against damage...

  10. Comparisons of sediment losses from a newly constructed cross-country natural gas pipeline and an existing in-road pipeline

    Treesearch

    Pamela J. Edwards; Bridget M. Harrison; Daniel J. Holz; Karl W.J. Williard; Jon E. Schoonover

    2014-01-01

    Sediment loads were measured for about one year from natural gas pipelines in two studies in north central West Virginia. One study involved a 1-year-old pipeline buried within the bed of a 25-year-old skid road, and the other involved a newly constructed cross-country pipeline. Both pipelines were the same diameter and were installed using similar trenching and...

  11. About U.S. Natural Gas Pipelines

    EIA Publications

    2007-01-01

    This information product provides the interested reader with a broad and non-technical overview of how the U.S. natural gas pipeline network operates, along with some insights into the many individual pipeline systems that make up the network. While the focus of the presentation is the transportation of natural gas over the interstate and intrastate pipeline systems, information on subjects related to pipeline development, such as system design and pipeline expansion, are also included.

  12. Remediating MGP brownfields

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larsen, B.R.

    Before natural gas pipelines became widespread in this country, gas fuel was produced locally in more than 5,000 manufactured gas plants (MGPs). The toxic wastes from these processes often were disposed onsite and have since seeped into the surrounding soil and groundwater. Although the MGPs--commonly called gas plants, gas-works or town gas plants--have closed and most have been demolished, they have left a legacy of environmental contamination. At many MGP sites, underground storage tanks were constructed of wood or brick, with process piping and equipment which frequently leaked. Waste materials often were disposed onsite. Releases of coal tars, oils andmore » condensates produced within the plants contributed to a wide range of contamination from polycyclic aromatic hydrocarbons, phenols, benzene and cyanide. Remediation of selected MGP sites has been sporadic. Unless the site has been identified as a Comprehensive Environmental Response, Compensation and Liability Information System (CERCLIS) Superfund site, the regulatory initiative to remediate often remains with the state in which the MGP is located. A number of factors are working to change that picture and to create a renewed interest in MGP site remediation. The recent Brownfield Initiative by the US Environmental Protection Agency (EPA) is such an example.« less

  13. Mineral Dissolution and Secondary Precipitation on Quartz Sand in Simulated Hanford Tank Solutions Affecting Subsurface Porosity

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wang, Guohui; Um, Wooyong

    2012-11-23

    Highly alkaline nuclear waste solutions have been released from underground nuclear waste storage tanks and pipelines into the vadose zone at the U.S. Department of Energy’s Hanford Site in Washington, causing mineral dissolution and re-precipitation upon contact with subsurface sediments. High pH caustic NaNO3 solutions with and without dissolved Al were reacted with quartz sand through flow-through columns stepwise at 45, 51, and 89°C to simulate possible reactions between leaked nuclear waste solution and primary subsurface mineral. Upon reaction, Si was released from the dissolution of quartz sand, and nitrate-cancrinite [Na8Si6Al6O24(NO3)2] precipitated on the quartz surface as a secondary mineralmore » phase. Both steady-state dissolution and precipitation kinetics were quantified, and quartz dissolution apparent activation energy was determined. Mineral alteration through dissolution and precipitation processes results in pore volume and structure changes in the subsurface porous media. In this study, the column porosity increased up to 40.3% in the pure dissolution column when no dissolved Al was present in the leachate, whereas up to a 26.5% porosity decrease was found in columns where both dissolution and precipitation were observed because of the presence of Al in the input solution. The porosity change was also confirmed by calculation using the dissolution and precipitation rates and mineral volume changes.« less

  14. Middleware Case Study: MeDICi

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wynne, Adam S.

    2011-05-05

    In many application domains in science and engineering, data produced by sensors, instruments and networks is naturally processed by software applications structured as a pipeline . Pipelines comprise a sequence of software components that progressively process discrete units of data to produce a desired outcome. For example, in a Web crawler that is extracting semantics from text on Web sites, the first stage in the pipeline might be to remove all HTML tags to leave only the raw text of the document. The second step may parse the raw text to break it down into its constituent grammatical parts, suchmore » as nouns, verbs and so on. Subsequent steps may look for names of people or places, interesting events or times so documents can be sequenced on a time line. Each of these steps can be written as a specialized program that works in isolation with other steps in the pipeline. In many applications, simple linear software pipelines are sufficient. However, more complex applications require topologies that contain forks and joins, creating pipelines comprising branches where parallel execution is desirable. It is also increasingly common for pipelines to process very large files or high volume data streams which impose end-to-end performance constraints. Additionally, processes in a pipeline may have specific execution requirements and hence need to be distributed as services across a heterogeneous computing and data management infrastructure. From a software engineering perspective, these more complex pipelines become problematic to implement. While simple linear pipelines can be built using minimal infrastructure such as scripting languages, complex topologies and large, high volume data processing requires suitable abstractions, run-time infrastructures and development tools to construct pipelines with the desired qualities-of-service and flexibility to evolve to handle new requirements. The above summarizes the reasons we created the MeDICi Integration Framework (MIF) that is designed for creating high-performance, scalable and modifiable software pipelines. MIF exploits a low friction, robust, open source middleware platform and extends it with component and service-based programmatic interfaces that make implementing complex pipelines simple. The MIF run-time automatically handles queues between pipeline elements in order to handle request bursts, and automatically executes multiple instances of pipeline elements to increase pipeline throughput. Distributed pipeline elements are supported using a range of configurable communications protocols, and the MIF interfaces provide efficient mechanisms for moving data directly between two distributed pipeline elements.« less

  15. The State of the Human Proteome in 2013 as viewed through PeptideAtlas: Comparing the Kidney, Urine, and Plasma Proteomes for the Biology and Disease-driven Human Proteome Project

    PubMed Central

    Farrah, Terry; Deutsch, Eric W.; Omenn, Gilbert S.; Sun, Zhi; Watts, Julian D.; Yamamoto, Tadashi; Shteynberg, David; Harris, Micheleen M.; Moritz, Robert L.

    2014-01-01

    The kidney, urine, and plasma proteomes are intimately related: proteins and metabolic waste products are filtered from the plasma by the kidney and excreted via the urine, while kidney proteins may be secreted into the circulation or released into the urine. Shotgun proteomics datasets derived from human kidney, urine, and plasma samples were collated and processed using a uniform software pipeline, and relative protein abundances were estimated by spectral counting. The resulting PeptideAtlas builds yielded 4005, 2491, and 3553 nonredundant proteins at 1% FDR for the kidney, urine, and plasma proteomes, respectively—for kidney and plasma, the largest high-confidence protein sets to date. The same pipeline applied to all available human data yielded a 2013 Human PeptideAtlas build containing 12,644 nonredundant proteins and at least one peptide for each of ~14,000 Swiss-Prot entries, an increase over 2012 of ~7.5% of the predicted human proteome. We demonstrate that abundances are correlated between plasma and urine, examine the most abundant urine proteins not derived from either plasma or kidney, and consider the biomarker potential of proteins associated with renal decline. This analysis forms part of the Biology and Disease-driven Human Proteome Project (B/D-HPP) and a contribution to the Chromosome-centric Human Proteome Project (C-HPP) special issue. PMID:24261998

  16. 76 FR 43604 - Pipeline Safety: Applying Safety Regulations to All Rural Onshore Hazardous Liquid Low-Stress...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-21

    ... Regulations to All Rural Onshore Hazardous Liquid Low-Stress Lines, Correction AGENCY: Pipeline and Hazardous... the Federal Pipeline Safety Regulations to address rural low-stress hazardous liquid pipelines that... regarding the compliance date for identifying all segments of a Category 3 low-stress pipeline. DATES: This...

  17. 77 FR 48145 - Cameron Interstate Pipeline, LLC, Cameron LNG, LLC; Notice of Intent To Prepare an Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-13

    ... operation of the Cameron Pipeline Expansion Project and the Cameron Liquefied Natural Gas (LNG) Liquefaction... Pipeline Expansion Project would be constructed and operated to provide natural gas to the planned export...-diameter pipeline extending from an interconnection with the Florida Gas Transmission Pipeline in Calcasieu...

  18. 18 CFR 357.3 - FERC Form No. 73, Oil Pipeline Data for Depreciation Analysis.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Pipeline Data for Depreciation Analysis. 357.3 Section 357.3 Conservation of Power and Water Resources... No. 73, Oil Pipeline Data for Depreciation Analysis. (a) Who must file. Any oil pipeline company.... 73, Oil Pipeline Data for Depreciation Analysis, available for review at the Commission's Public...

  19. 30 CFR 250.1007 - What to include in applications.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... coordinates of key points; and the location of other pipelines that will be connected to or crossed by the proposed pipeline(s). The initial and terminal points of the pipeline and any continuation into State jurisdiction shall be accurately located even if the pipeline is to have an onshore terminal point. A plat(s...

  20. 49 CFR 192.627 - Tapping pipelines under pressure.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Tapping pipelines under pressure. 192.627 Section... NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Operations § 192.627 Tapping pipelines under pressure. Each tap made on a pipeline under pressure must be performed by a crew qualified to make...

  1. 77 FR 6857 - Pipeline Safety: Notice of Public Meetings on Improving Pipeline Leak Detection System...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-09

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID... installed to lessen the volume of natural gas and hazardous liquid released during catastrophic pipeline... p.m. Panel 3: Considerations for Natural Gas Pipeline Leak Detection Systems 3:30 p.m. Break 3:45 p...

  2. 78 FR 13747 - Railroad Safety: Advisory Notice Related to Railroad Accidents in Vicinity of Underground Pipelines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-28

    ... underground natural gas transmission pipeline operated by Nicor Gas. The pipeline well exceeded Federal... had the gas pipeline been installed at the railroad crossing with only the minimum level of ground... resumption of service.'' On July 31, 2012, the Pipeline and Hazardous Materials Safety Administration (PHMSA...

  3. 77 FR 14010 - Millennium Pipeline Company, LLC; Notice of Availability of the Environmental Assessment for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-08

    ... emergency electrical power generator. Pipeline facilities required for the project include approximately 545 feet of new 36-inch- diameter suction and discharge pipelines which would connect the compressor... pipeline located between the new suction and discharge pipelines. The FERC staff mailed copies of the EA to...

  4. Unipro UGENE NGS pipelines and components for variant calling, RNA-seq and ChIP-seq data analyses.

    PubMed

    Golosova, Olga; Henderson, Ross; Vaskin, Yuriy; Gabrielian, Andrei; Grekhov, German; Nagarajan, Vijayaraj; Oler, Andrew J; Quiñones, Mariam; Hurt, Darrell; Fursov, Mikhail; Huyen, Yentram

    2014-01-01

    The advent of Next Generation Sequencing (NGS) technologies has opened new possibilities for researchers. However, the more biology becomes a data-intensive field, the more biologists have to learn how to process and analyze NGS data with complex computational tools. Even with the availability of common pipeline specifications, it is often a time-consuming and cumbersome task for a bench scientist to install and configure the pipeline tools. We believe that a unified, desktop and biologist-friendly front end to NGS data analysis tools will substantially improve productivity in this field. Here we present NGS pipelines "Variant Calling with SAMtools", "Tuxedo Pipeline for RNA-seq Data Analysis" and "Cistrome Pipeline for ChIP-seq Data Analysis" integrated into the Unipro UGENE desktop toolkit. We describe the available UGENE infrastructure that helps researchers run these pipelines on different datasets, store and investigate the results and re-run the pipelines with the same parameters. These pipeline tools are included in the UGENE NGS package. Individual blocks of these pipelines are also available for expert users to create their own advanced workflows.

  5. The ALMA Science Pipeline: Current Status

    NASA Astrophysics Data System (ADS)

    Humphreys, Elizabeth; Miura, Rie; Brogan, Crystal L.; Hibbard, John; Hunter, Todd R.; Indebetouw, Remy

    2016-09-01

    The ALMA Science Pipeline is being developed for the automated calibration and imaging of ALMA interferometric and single-dish data. The calibration Pipeline for interferometric data was accepted for use by ALMA Science Operations in 2014, and for single-dish data end-to-end processing in 2015. However, work is ongoing to expand the use cases for which the Pipeline can be used e.g. for higher frequency and lower signal-to-noise datasets, and for new observing modes. A current focus includes the commissioning of science target imaging for interferometric data. For the Single Dish Pipeline, the line finding algorithm used in baseline subtraction and baseline flagging heuristics have been greately improved since the prototype used for data from the previous cycle. These algorithms, unique to the Pipeline, produce better results than standard manual processing in many cases. In this poster, we report on the current status of the Pipeline capabilities, present initial results from the Imaging Pipeline, and the smart line finding and flagging algorithm used in the Single Dish Pipeline. The Pipeline is released as part of CASA (the Common Astronomy Software Applications package).

  6. A Review of Fatigue Crack Growth for Pipeline Steels Exposed to Hydrogen

    PubMed Central

    Nanninga, N.; Slifka, A.; Levy, Y.; White, C.

    2010-01-01

    Hydrogen pipeline systems offer an economical means of storing and transporting energy in the form of hydrogen gas. Pipelines can be used to transport hydrogen that has been generated at solar and wind farms to and from salt cavern storage locations. In addition, pipeline transportation systems will be essential before widespread hydrogen fuel cell vehicle technology becomes a reality. Since hydrogen pipeline use is expected to grow, the mechanical integrity of these pipelines will need to be validated under the presence of pressurized hydrogen. This paper focuses on a review of the fatigue crack growth response of pipeline steels when exposed to gaseous hydrogen environments. Because of defect-tolerant design principles in pipeline structures, it is essential that designers consider hydrogen-assisted fatigue crack growth behavior in these applications. PMID:27134796

  7. United States petroleum pipelines: An empirical analysis of pipeline sizing

    NASA Astrophysics Data System (ADS)

    Coburn, L. L.

    1980-12-01

    The undersizing theory hypothesizes that integrated oil companies have a strong economic incentive to size the petroleum pipelines they own and ship over in a way that means that some of the demand must utilize higher cost alternatives. The DOJ theory posits that excess or monopoly profits are earned due to the natural monopoly characteristics of petroleum pipelines and the existence of market power in some pipelines at either the upstream or downstream market. The theory holds that independent petroleum pipelines owned by companies not otherwise affiliated with the petroleum industry (independent pipelines) do not have these incentives and all the efficiencies of pipeline transportation are passed to the ultimate consumer. Integrated oil companies on the other hand, keep these cost efficiencies for themselves in the form of excess profits.

  8. 77 FR 45417 - Pipeline Safety: Inspection and Protection of Pipeline Facilities After Railway Accidents

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-31

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... Accidents AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA); DOT. [[Page 45418

  9. Demonstration of the enrichment of medium quality gas from gob wells through interactive well operating practices. Final report, June--December, 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Blackburn, S.T.; Sanders, R.G.; Boyer, C.M. II

    1995-12-01

    Methane released to the atmosphere during coal mining operations is believed to contribute to global warming and represents a waste of a valuable energy resource. Commercial production of pipeline-quality gob well methane through wells drilled from the surface into the area above the gob can, if properly implemented, be the most effective means of reducing mine methane emissions. However, much of the gas produced from gob wells is vented because the quality of the gas is highly variable and is often below current natural gas pipeline specifications. Prior to the initiation of field-testing required to further understand the operational criteriamore » for upgrading gob well gas, a preliminary evaluation and assessment was performed. An assessment of the methane gas in-place and producible methane resource at the Jim Walter Resources, Inc. No. 4 and No. 5 Mines established a potential 15-year supply of 60 billion cubic feet of mien methane from gob wells, satisfying the resource criteria for the test site. To understand the effect of operating conditions on gob gas quality, gob wells producing pipeline quality (i.e., < 96% hydrocarbons) gas at this site will be operated over a wide range of suction pressures. Parameters to be determined will include absolute methane quantity and methane concentration produced through the gob wells; working face, tailgate and bleeder entry methane levels in the mine; and the effect on the economics of production of gob wells at various levels of methane quality. Following this, a field demonstration will be initiated at a mine where commercial gob gas production has not been attempted. The guidelines established during the first phase of the project will be used to design the production program. The economic feasibility of various utilization options will also be tested based upon the information gathered during the first phase. 41 refs., 41 figs., 12 tabs.« less

  10. U.S. pipeline industry enters new era

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnsen, M.R.

    1999-11-01

    The largest construction project in North America this year and next--the Alliance Pipeline--marks some advances for the US pipeline industry. With the Alliance Pipeline system (Alliance), mechanized welding and ultrasonic testing are making their debuts in the US as primary mainline construction techniques. Particularly in Canada and Europe, mechanized welding technology has been used for both onshore and offshore pipeline construction for at least 15 years. However, it has never before been used to build a cross-country pipeline in the US, although it has been tested on short segments. This time, however, an accelerated construction schedule, among other reasons, necessitatedmore » the use of mechanized gas metal arc welding (GMAW). The $3-billion pipeline will delivery natural gas from northwestern British Columbia and northeastern Alberta in Canada to a hub near Chicago, Ill., where it will connect to the North American pipeline grid. Once the pipeline is completed and buried, crews will return the topsoil. Corn and other crops will reclaim the land. While the casual passerby probably won't know the Alliance pipeline is there, it may have a far-reaching effect on the way mainline pipelines are built in the US. For even though mechanized welding and ultrasonic testing are being used for the first time in the United States on this project, some US workers had already gained experience with the technology on projects elsewhere. And work on this pipeline has certainly developed a much larger pool of experienced workers for industry to draw from. The Alliance project could well signal the start of a new era in US pipeline construction.« less

  11. drPACS: A Simple UNIX Execution Pipeline

    NASA Astrophysics Data System (ADS)

    Teuben, P.

    2011-07-01

    We describe a very simple yet flexible and effective pipeliner for UNIX commands. It creates a Makefile to define a set of serially dependent commands. The commands in the pipeline share a common set of parameters by which they can communicate. Commands must follow a simple convention to retrieve and store parameters. Pipeline parameters can optionally be made persistent across multiple runs of the pipeline. Tools were added to simplify running a large series of pipelines, which can then also be run in parallel.

  12. DDBJ read annotation pipeline: a cloud computing-based pipeline for high-throughput analysis of next-generation sequencing data.

    PubMed

    Nagasaki, Hideki; Mochizuki, Takako; Kodama, Yuichi; Saruhashi, Satoshi; Morizaki, Shota; Sugawara, Hideaki; Ohyanagi, Hajime; Kurata, Nori; Okubo, Kousaku; Takagi, Toshihisa; Kaminuma, Eli; Nakamura, Yasukazu

    2013-08-01

    High-performance next-generation sequencing (NGS) technologies are advancing genomics and molecular biological research. However, the immense amount of sequence data requires computational skills and suitable hardware resources that are a challenge to molecular biologists. The DNA Data Bank of Japan (DDBJ) of the National Institute of Genetics (NIG) has initiated a cloud computing-based analytical pipeline, the DDBJ Read Annotation Pipeline (DDBJ Pipeline), for a high-throughput annotation of NGS reads. The DDBJ Pipeline offers a user-friendly graphical web interface and processes massive NGS datasets using decentralized processing by NIG supercomputers currently free of charge. The proposed pipeline consists of two analysis components: basic analysis for reference genome mapping and de novo assembly and subsequent high-level analysis of structural and functional annotations. Users may smoothly switch between the two components in the pipeline, facilitating web-based operations on a supercomputer for high-throughput data analysis. Moreover, public NGS reads of the DDBJ Sequence Read Archive located on the same supercomputer can be imported into the pipeline through the input of only an accession number. This proposed pipeline will facilitate research by utilizing unified analytical workflows applied to the NGS data. The DDBJ Pipeline is accessible at http://p.ddbj.nig.ac.jp/.

  13. DDBJ Read Annotation Pipeline: A Cloud Computing-Based Pipeline for High-Throughput Analysis of Next-Generation Sequencing Data

    PubMed Central

    Nagasaki, Hideki; Mochizuki, Takako; Kodama, Yuichi; Saruhashi, Satoshi; Morizaki, Shota; Sugawara, Hideaki; Ohyanagi, Hajime; Kurata, Nori; Okubo, Kousaku; Takagi, Toshihisa; Kaminuma, Eli; Nakamura, Yasukazu

    2013-01-01

    High-performance next-generation sequencing (NGS) technologies are advancing genomics and molecular biological research. However, the immense amount of sequence data requires computational skills and suitable hardware resources that are a challenge to molecular biologists. The DNA Data Bank of Japan (DDBJ) of the National Institute of Genetics (NIG) has initiated a cloud computing-based analytical pipeline, the DDBJ Read Annotation Pipeline (DDBJ Pipeline), for a high-throughput annotation of NGS reads. The DDBJ Pipeline offers a user-friendly graphical web interface and processes massive NGS datasets using decentralized processing by NIG supercomputers currently free of charge. The proposed pipeline consists of two analysis components: basic analysis for reference genome mapping and de novo assembly and subsequent high-level analysis of structural and functional annotations. Users may smoothly switch between the two components in the pipeline, facilitating web-based operations on a supercomputer for high-throughput data analysis. Moreover, public NGS reads of the DDBJ Sequence Read Archive located on the same supercomputer can be imported into the pipeline through the input of only an accession number. This proposed pipeline will facilitate research by utilizing unified analytical workflows applied to the NGS data. The DDBJ Pipeline is accessible at http://p.ddbj.nig.ac.jp/. PMID:23657089

  14. State of art of seismic design and seismic hazard analysis for oil and gas pipeline system

    NASA Astrophysics Data System (ADS)

    Liu, Aiwen; Chen, Kun; Wu, Jian

    2010-06-01

    The purpose of this paper is to adopt the uniform confidence method in both water pipeline design and oil-gas pipeline design. Based on the importance of pipeline and consequence of its failure, oil and gas pipeline can be classified into three pipe classes, with exceeding probabilities over 50 years of 2%, 5% and 10%, respectively. Performance-based design requires more information about ground motion, which should be obtained by evaluating seismic safety for pipeline engineering site. Different from a city’s water pipeline network, the long-distance oil and gas pipeline system is a spatially linearly distributed system. For the uniform confidence of seismic safety, a long-distance oil and pipeline formed with pump stations and different-class pipe segments should be considered as a whole system when analyzing seismic risk. Considering the uncertainty of earthquake magnitude, the design-basis fault displacements corresponding to the different pipeline classes are proposed to improve deterministic seismic hazard analysis (DSHA). A new empirical relationship between the maximum fault displacement and the surface-wave magnitude is obtained with the supplemented earthquake data in East Asia. The estimation of fault displacement for a refined oil pipeline in Wenchuan M S8.0 earthquake is introduced as an example in this paper.

  15. Landfill gas to electricity demonstration project

    NASA Astrophysics Data System (ADS)

    Giuliani, A. J.; Cagliostro, L. A.

    1982-03-01

    Medium Btu methane gas is a naturally occurring by product of anaerobic digestion of landfilled municipal solid waste. The energy potential of landfill gas in New York State is estimated to be 61 trillion Btu's per year or the equivalent of 10 percent of the natural gas used annually in the State. The 18-month Landfill Gas to Electricity Demonstration Project conducted at the Fresh Kills Landfill in Staten Island, New York conclusively demonstrated that landfill gas is an acceptable fuel for producing electricity using an internal combustion engine/generator set. Landfill gas proved to be a reliable and consistent fuel source during a six-month field test program. Engine exhaust emissions were determined to be comparable to that of natural gas and no unusually high corrosion rates on standard pipeline material were found.

  16. Effect of blades number to performance of Savonius water turbine in water pipe

    NASA Astrophysics Data System (ADS)

    Hamzah, Imron; Prasetyo, Ari; Tjahjana, D. D. D. Prija; Hadi, Syamsul

    2018-02-01

    Savonius is usually known as a wind turbine that works efficiently at low wind speed. In this research, the Savonius turbine is proposed for a pico hydro power plant that is installed straightly on the 3-inch vertical pipeline of rainwater and household waste. The Savonius water turbine was designed with blade curvature angle of 70°, the aspect ratio of 1, turbine diameter of 82 mm, and endplate ratio of 1,1. The experimental study investigated the effect of blades number to the performance of Savonius turbine on various volume flow rate of water. Savonius turbine with three blades number generated the highest coefficient of performance of 0.23 on tip speed ratio of 1.7 compared to turbines with the number of other blades.

  17. Organic Rankine Cycle for Residual Heat to Power Conversion in Natural Gas Compressor Station. Part I: Modelling and Optimisation Framework

    NASA Astrophysics Data System (ADS)

    Chaczykowski, Maciej

    2016-06-01

    Basic organic Rankine cycle (ORC), and two variants of regenerative ORC have been considered for the recovery of exhaust heat from natural gas compressor station. The modelling framework for ORC systems has been presented and the optimisation of the systems was carried out with turbine power output as the variable to be maximized. The determination of ORC system design parameters was accomplished by means of the genetic algorithm. The study was aimed at estimating the thermodynamic potential of different ORC configurations with several working fluids employed. The first part of this paper describes the ORC equipment models which are employed to build a NLP formulation to tackle design problems representative for waste energy recovery on gas turbines driving natural gas pipeline compressors.

  18. 49 CFR 195.12 - What requirements apply to low-stress pipelines in rural areas?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false What requirements apply to low-stress pipelines in... low-stress pipelines in rural areas? (a) General. This section does not apply to a rural low-stress pipeline regulated under this part as a low-stress pipeline that crosses a waterway currently used for...

  19. Regulatory assessment with regulatory flexibility analysis : draft regulatory evaluation - Notice of Proposed Rulemaking -- Pipeline Safety : safety standards for increasing the maximum allowable operating pressure for natural gas transmission pipelines.

    DOT National Transportation Integrated Search

    2008-02-01

    The Pipeline and Hazardous Materials Safety Administration (PHMSA) is proposing changes to the Federal pipeline safety regulations in 49 CFR Part 192, which cover the transportation of natural gas by pipeline. Specifically, PHMSA proposes allowing na...

  20. Oil and gas pipeline construction cost analysis and developing regression models for cost estimation

    NASA Astrophysics Data System (ADS)

    Thaduri, Ravi Kiran

    In this study, cost data for 180 pipelines and 136 compressor stations have been analyzed. On the basis of the distribution analysis, regression models have been developed. Material, Labor, ROW and miscellaneous costs make up the total cost of a pipeline construction. The pipelines are analyzed based on different pipeline lengths, diameter, location, pipeline volume and year of completion. In a pipeline construction, labor costs dominate the total costs with a share of about 40%. Multiple non-linear regression models are developed to estimate the component costs of pipelines for various cross-sectional areas, lengths and locations. The Compressor stations are analyzed based on the capacity, year of completion and location. Unlike the pipeline costs, material costs dominate the total costs in the construction of compressor station, with an average share of about 50.6%. Land costs have very little influence on the total costs. Similar regression models are developed to estimate the component costs of compressor station for various capacities and locations.

  1. A Study on Optimal Sizing of Pipeline Transporting Equi-sized Particulate Solid-Liquid Mixture

    NASA Astrophysics Data System (ADS)

    Asim, Taimoor; Mishra, Rakesh; Pradhan, Suman; Ubbi, Kuldip

    2012-05-01

    Pipelines transporting solid-liquid mixtures are of practical interest to the oil and pipe industry throughout the world. Such pipelines are known as slurry pipelines where the solid medium of the flow is commonly known as slurry. The optimal designing of such pipelines is of commercial interests for their widespread acceptance. A methodology has been evolved for the optimal sizing of a pipeline transporting solid-liquid mixture. Least cost principle has been used in sizing such pipelines, which involves the determination of pipe diameter corresponding to the minimum cost for given solid throughput. The detailed analysis with regard to transportation of slurry having solids of uniformly graded particles size has been included. The proposed methodology can be used for designing a pipeline for transporting any solid material for different solid throughput.

  2. 30 CFR 250.1006 - How must I decommission and take out of service a DOI pipeline?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... a DOI pipeline? 250.1006 Section 250.1006 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT... and Pipeline Rights-of-Way § 250.1006 How must I decommission and take out of service a DOI pipeline...) The table in this section lists the requirements if you take a DOI pipeline out of service: If you...

  3. Analysis of the strength of sea gas pipelines of positive buoyancy conditioned by glaciation

    NASA Astrophysics Data System (ADS)

    Malkov, Venyamin; Kurbatova, Galina; Ermolaeva, Nadezhda; Malkova, Yulia; Petrukhin, Ruslan

    2018-05-01

    A technique for estimating the stress state of a gas pipeline laid along the seabed in northern latitudes in the presence of glaciation is proposed. It is assumed that the pipeline lies on the bottom of the seabed, but under certain conditions on the some part of the pipeline a glaciation is formed and the gas pipeline section in the place of glaciation can come off the ground due to the positive buoyancy of the ice. Calculation of additional stresses caused by bending of the pipeline is of practical interest for strength evaluation. The gas pipeline is a two-layer cylindrical shell of circular cross section. The inner layer is made of high-strength steel, the outer layer is made of reinforced ferroconcrete. The proposed methodology for calculating the gas pipeline for strength is based on the equations of the theory of shells. The procedure takes into account the effect of internal gas pressure, external pressure of sea water, the weight of two-layer gas pipeline and the weight of the ice layer. The lifting force created by the displaced fluid and the positive buoyancy of the ice is also taken into account. It is significant that the listed loads cause only two types of deformation of the gas pipeline: axisymmetric and antisymmetric. The interaction of the pipeline with the ground as an elastic foundation is not considered. The main objective of the research is to establish the fact of separation of part of the pipeline from the ground. The method of calculations of stresses and deformations occurring in a model sea gas pipeline is presented.

  4. 78 FR 53751 - Dominion NGL Pipelines, LLC; Notice of Petition for Declaratory Order

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-30

    ... new ethane pipeline (Natrium Ethane Pipeline) extending from a new natural gas processing and... utilize, or pay for, significant capacity on the Natrium Ethane Pipeline (Committed Shipper); and (3) the...

  5. 49 CFR 192.51 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE... for the selection and qualification of pipe and components for use in pipelines. ...

  6. Numerical Modeling of Mechanical Behavior for Buried Steel Pipelines Crossing Subsidence Strata

    PubMed Central

    Han, C. J.

    2015-01-01

    This paper addresses the mechanical behavior of buried steel pipeline crossing subsidence strata. The investigation is based on numerical simulation of the nonlinear response of the pipeline-soil system through finite element method, considering large strain and displacement, inelastic material behavior of buried pipeline and the surrounding soil, as well as contact and friction on the pipeline-soil interface. Effects of key parameters on the mechanical behavior of buried pipeline were investigated, such as strata subsidence, diameter-thickness ratio, buried depth, internal pressure, friction coefficient and soil properties. The results show that the maximum strain appears on the outer transition subsidence section of the pipeline, and its cross section is concave shaped. With the increasing of strata subsidence and diameter-thickness ratio, the out of roundness, longitudinal strain and equivalent plastic strain increase gradually. With the buried depth increasing, the deflection, out of roundness and strain of the pipeline decrease. Internal pressure and friction coefficient have little effect on the deflection of buried pipeline. Out of roundness is reduced and the strain is increased gradually with the increasing of internal pressure. The physical properties of soil have a great influence on the mechanical properties of buried pipeline. The results from the present study can be used for the development of optimization design and preventive maintenance for buried steel pipelines. PMID:26103460

  7. 78 FR 16764 - Pipeline Safety: Information Collection Activities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-18

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2012-0302] Pipeline Safety: Information Collection Activities AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: Notice and Request for Comments on a Previously...

  8. 78 FR 24309 - Pipeline and Hazardous Materials Safety Administration

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-24

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration List of Special Permit Applications Delayed AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA..., Pipeline and Hazardous Materials Safety Administration, U.S. Department of Transportation, East Building...

  9. 75 FR 40863 - Pipeline Safety: Information Collection Activities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-14

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2010-0193] Pipeline Safety: Information Collection Activities AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: Notice and request for comments. SUMMARY: In...

  10. 77 FR 74276 - Pipeline Safety: Information Collection Activities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-13

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2012-0302] Pipeline Safety: Information Collection Activities AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: Notice and request for comments. SUMMARY: In...

  11. 75 FR 32836 - Pipeline Safety: Workshop on Public Awareness Programs

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-09

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID... American Public Gas Association Association of Oil Pipelines American Petroleum Institute Interstate... the pipeline industry). Hazardous Liquid Gas Transmission/Gathering Natural Gas Distribution (10...

  12. 76 FR 70217 - Pipeline Safety: Information Collection Activities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-10

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Administration [Docket No. PHMSA... OMB approval of new Information Collection. AGENCY: Pipeline and Hazardous Materials Safety... Pipeline and Hazardous Materials Safety Administration (PHMSA) published a notice in the Federal Register...

  13. 76 FR 50539 - Pipeline Safety: Information Collection Activities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-15

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2011-0136] Pipeline Safety: Information Collection Activities AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: Notice and request for comments. SUMMARY: In...

  14. 30 CFR 250.1751 - How do I decommission a pipeline in place?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... to be decommissioned; and (4) Length (feet) of segment remaining. (b) Pig the pipeline, unless the Regional Supervisor determines that pigging is not practical; (c) Flush the pipeline; (d) Fill the pipeline...

  15. 30 CFR 250.1751 - How do I decommission a pipeline in place?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... to be decommissioned; and (4) Length (feet) of segment remaining. (b) Pig the pipeline, unless the Regional Supervisor determines that pigging is not practical; (c) Flush the pipeline; (d) Fill the pipeline...

  16. 30 CFR 250.1751 - How do I decommission a pipeline in place?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Length (feet) of segment remaining. (b) Pig the pipeline, unless the Regional Supervisor determines that pigging is not practical; (c) Flush the pipeline; (d) Fill the pipeline with seawater; (e) Cut and plug...

  17. 30 CFR 250.1751 - How do I decommission a pipeline in place?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... to be decommissioned; and (4) Length (feet) of segment remaining. (b) Pig the pipeline, unless the Regional Supervisor determines that pigging is not practical; (c) Flush the pipeline; (d) Fill the pipeline...

  18. 30 CFR 250.1751 - How do I decommission a pipeline in place?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... to be decommissioned; and (4) Length (feet) of segment remaining. (b) Pig the pipeline, unless the Regional Supervisor determines that pigging is not practical; (c) Flush the pipeline; (d) Fill the pipeline...

  19. Diagnostic Inspection of Pipelines for Estimating the State of Stress in Them

    NASA Astrophysics Data System (ADS)

    Subbotin, V. A.; Kolotilov, Yu. V.; Smirnova, V. Yu.; Ivashko, S. K.

    2017-12-01

    The diagnostic inspection used to estimate the technical state of a pipeline is described. The problems of inspection works are listed, and a functional-structural scheme is developed to estimate the state of stress in a pipeline. Final conclusions regarding the actual loading of a pipeline section are drawn upon a cross analysis of the entire information obtained during pipeline inspection.

  20. Pipeline repair development in support of the Oman to India gas pipeline

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Abadie, W.; Carlson, W.

    1995-12-01

    This paper provides a summary of development which has been conducted to date for the ultra deep, diverless pipeline repair system for the proposed Oman to India Gas Pipeline. The work has addressed critical development areas involving testing and/or prototype development of tools and procedures required to perform a diverless pipeline repair in water depths of up to 3,525 m.

  1. Design of oil pipeline leak detection and communication system based on optical fiber technology

    NASA Astrophysics Data System (ADS)

    Tu, Yaqing; Chen, Huabo

    1999-08-01

    The integrity of oil pipeline is always a major concern of operators. Pipeline leak not only leads to loss of oil, but pollutes environment. A new pipeline leak detection and communication system based on optical fiber technology to ensure the pipeline reliability is presented. Combined direct leak detection method with an indirect one, the system will greatly reduce the rate of false alarm. According, to the practical features of oil pipeline,the pipeline communication system is designed employing the state-of-the-art optic fiber communication technology. The system has such feature as high location accuracy of leak detection, good real-time characteristic, etc. which overcomes the disadvantages of traditional leak detection methods and communication system effectively.

  2. Hydrocarbons pipeline transportation risk assessment

    NASA Astrophysics Data System (ADS)

    Zanin, A. V.; Milke, A. A.; Kvasov, I. N.

    2018-04-01

    The pipeline transportation applying risks assessment issue in the arctic conditions is addressed in the paper. Pipeline quality characteristics in the given environment has been assessed. To achieve the stated objective, the pipelines mathematical model was designed and visualized by using the software product SOLIDWORKS. When developing the mathematical model the obtained results made possible to define the pipeline optimal characteristics for designing on the Arctic sea bottom. In the course of conducting the research the pipe avalanche collapse risks were examined, internal longitudinal and circular loads acting on the pipeline were analyzed, as well as the water impact hydrodynamic force was taken into consideration. The conducted calculation can contribute to the pipeline transport further development under the harsh climate conditions of the Russian Federation Arctic shelf territory.

  3. Long-Term Monitoring of Cased Pipelines Using Longrange Guided-Wave Technique

    DOT National Transportation Integrated Search

    2009-05-19

    Integrity management programs for gas transmission pipelines are required by The Office of Pipeline Safety (OPS)/DOT. Direct Assessment (DA) and 'Other Technologies' have become the focus of assessment options for pipeline integrity on cased crossing...

  4. 75 FR 13807 - Pipeline Safety: Information Collection Activities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-23

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... of Transportation, Pipeline and Hazardous Materials Safety Administration, 1200 New Jersey Avenue, SE...: Updates to Pipeline and Liquefied Natural Gas Reporting Requirements (One Rule). The Notice of Proposed...

  5. 49 CFR 192.947 - What records must an operator keep?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 192.947 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Gas Transmission Pipeline...

  6. 75 FR 4610 - Pipeline Safety: Information Collection Activities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-28

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2009-0375] Pipeline Safety: Information Collection Activities AGENCY: Pipeline and Hazardous Materials Safety Administration. ACTION: Notice and request for comments. SUMMARY: On November 24, 2009, as...

  7. 49 CFR 193.2001 - Scope of part.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES... LNG facilities used in the transportation of gas by pipeline that is subject to the pipeline safety...

  8. 76 FR 45904 - Pipeline Safety: Information Collection Activities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-01

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... at U.S. Department of Transportation, Pipeline and Hazardous Materials Safety Administration, 1200...: On Occasion. Title: Record Keeping for Natural Gas Pipeline Operators. OMB Control Number: 2137-0049...

  9. 49 CFR 192.949 - How does an operator notify PHMSA?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 192.949 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Gas Transmission Pipeline Integrity...

  10. 49 CFR 192.1011 - What records must an operator keep?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 192.1011 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Gas Distribution Pipeline...

  11. 75 FR 67807 - Pipeline Safety: Emergency Preparedness Communications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-03

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... is issuing an Advisory Bulletin to remind operators of gas and hazardous liquid pipeline facilities... Gas Pipeline Systems. Subject: Emergency Preparedness Communications. Advisory: To further enhance the...

  12. 76 FR 65778 - Pipeline Safety: Information Collection Activities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-24

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No...: 12,120. Frequency of Collection: On occasion. 2. Title: Recordkeeping for Natural Gas Pipeline... investigating incidents. Affected Public: Operators of natural gas pipeline systems. Annual Reporting and...

  13. Relationship between Pipeline Wall Thickness (Gr. X60) and Water Depth towards Avoiding Failure during Installation

    NASA Astrophysics Data System (ADS)

    Razak, K. Abdul; Othman, M. I. H.; Mat Yusuf, S.; Fuad, M. F. I. Ahmad; yahaya, Effah

    2018-05-01

    Oil and gas today being developed at different water depth characterized as shallow, deep and ultra-deep waters. Among the major components involved during the offshore installation is pipelines. Pipelines are a transportation method of material through a pipe. In oil and gas industry, pipeline come from a bunch of line pipe that welded together to become a long pipeline and can be divided into two which is gas pipeline and oil pipeline. In order to perform pipeline installation, we need pipe laying barge or pipe laying vessel. However, pipe laying vessel can be divided into two types: S-lay vessel and J-lay vessel. The function of pipe lay vessel is not only to perform pipeline installation. It also performed installation of umbilical or electrical cables. In the simple words, pipe lay vessel is performing the installation of subsea in all the connecting infrastructures. Besides that, the installation processes of pipelines require special focus to make the installation succeed. For instance, the heavy pipelines may exceed the lay vessel’s tension capacities in certain kind of water depth. Pipeline have their own characteristic and we can group it or differentiate it by certain parameters such as grade of material, type of material, size of diameter, size of wall thickness and the strength. For instances, wall thickness parameter studies indicate that if use the higher steel grade of the pipelines will have a significant contribution in pipeline wall thickness reduction. When running the process of pipe lay, water depth is the most critical thing that we need to monitor and concern about because of course we cannot control the water depth but we can control the characteristic of the pipe like apply line pipe that have wall thickness suitable with current water depth in order to avoid failure during the installation. This research will analyse whether the pipeline parameter meet the requirements limit and minimum yield stress. It will overlook to simulate pipe grade API 5L X60 which size from 8 to 20mm thickness with a water depth of 50 to 300m. Result shown that pipeline installation will fail from the wall thickness of 18mm onwards since it has been passed the critical yield percentage.

  14. Frequency Spectrum Method-Based Stress Analysis for Oil Pipelines in Earthquake Disaster Areas

    PubMed Central

    Wu, Xiaonan; Lu, Hongfang; Huang, Kun; Wu, Shijuan; Qiao, Weibiao

    2015-01-01

    When a long distance oil pipeline crosses an earthquake disaster area, inertial force and strong ground motion can cause the pipeline stress to exceed the failure limit, resulting in bending and deformation failure. To date, researchers have performed limited safety analyses of oil pipelines in earthquake disaster areas that include stress analysis. Therefore, using the spectrum method and theory of one-dimensional beam units, CAESAR II is used to perform a dynamic earthquake analysis for an oil pipeline in the XX earthquake disaster area. This software is used to determine if the displacement and stress of the pipeline meet the standards when subjected to a strong earthquake. After performing the numerical analysis, the primary seismic action axial, longitudinal and horizontal displacement directions and the critical section of the pipeline can be located. Feasible project enhancement suggestions based on the analysis results are proposed. The designer is able to utilize this stress analysis method to perform an ultimate design for an oil pipeline in earthquake disaster areas; therefore, improving the safe operation of the pipeline. PMID:25692790

  15. Energy intensity, life-cycle greenhouse gas emissions, and economic assessment of liquid biofuel pipelines.

    PubMed

    Strogen, Bret; Horvath, Arpad; Zilberman, David

    2013-12-01

    Petroleum fuels are predominantly transported domestically by pipelines, whereas biofuels are almost exclusively transported by rail, barge, and truck. As biofuel production increases, new pipelines may become economically attractive. Location-specific variables impacting pipeline viability include construction costs, availability and costs of alternative transportation modes, electricity prices and emissions (if priced), throughput, and subsurface temperature. When transporting alcohol or diesel-like fuels, pipelines have a lower direct energy intensity than rail, barge, and trucks if fluid velocity is under 1 m/s for 4-inch diameter pipelines and 2 m/s for 8-inch or larger pipelines. Across multiple hypothetical state-specific scenarios, profit-maximizing design velocities range from 1.2 to 1.9 m/s. In costs and GHG emissions, optimized pipelines outperform trucks in each state and rail and barge in most states, if projected throughput exceeds four billion liters/year. If emissions are priced, optimum design diameters typically increase to reduce pumping energy demands, increasing the cost-effectiveness of pipeline projects. Copyright © 2013 Elsevier Ltd. All rights reserved.

  16. Frequency spectrum method-based stress analysis for oil pipelines in earthquake disaster areas.

    PubMed

    Wu, Xiaonan; Lu, Hongfang; Huang, Kun; Wu, Shijuan; Qiao, Weibiao

    2015-01-01

    When a long distance oil pipeline crosses an earthquake disaster area, inertial force and strong ground motion can cause the pipeline stress to exceed the failure limit, resulting in bending and deformation failure. To date, researchers have performed limited safety analyses of oil pipelines in earthquake disaster areas that include stress analysis. Therefore, using the spectrum method and theory of one-dimensional beam units, CAESAR II is used to perform a dynamic earthquake analysis for an oil pipeline in the XX earthquake disaster area. This software is used to determine if the displacement and stress of the pipeline meet the standards when subjected to a strong earthquake. After performing the numerical analysis, the primary seismic action axial, longitudinal and horizontal displacement directions and the critical section of the pipeline can be located. Feasible project enhancement suggestions based on the analysis results are proposed. The designer is able to utilize this stress analysis method to perform an ultimate design for an oil pipeline in earthquake disaster areas; therefore, improving the safe operation of the pipeline.

  17. 78 FR 10689 - Pipeline Safety: Public Forum State One-Call Exemptions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-14

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... Safety, Pipeline and Hazardous Materials Safety Administration, DOT. ACTION: Notice; public forum. SUMMARY: The Pipeline and Hazardous Materials Safety Administration will sponsor a public forum on state...

  18. Project Report: Active Pipeline Encroachment Detector (Phase I)

    DOT National Transportation Integrated Search

    2008-06-10

    Of the many pipeline accident causes that occur to oil and gas pipelines, approximately 40% of are caused by third-party excavating activities into the buried pipeline right of way (ROW). According to DOT statistics, excavation damage is the second l...

  19. Project #153M: Guidance for Assessing the Remaining Strength of Corroded Pipelines

    DOT National Transportation Integrated Search

    2010-04-01

    Incident statistics have consistently shown that corrosion is the primary cause of pipeline failures in liquid pipelines, and is the second largest cause of failures in natural gas transmission pipelines and distribution piping. Corrosion can cause m...

  20. 76 FR 35130 - Pipeline Safety: Control Room Management/Human Factors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-16

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Parts...: Control Room Management/Human Factors AGENCY: Pipeline and Hazardous Materials Safety Administration... safety standards, risk assessments, and safety policies for natural gas pipelines and for hazardous...

  1. 76 FR 5494 - Pipeline Safety: Mechanical Fitting Failure Reporting Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-01

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part... Safety: Mechanical Fitting Failure Reporting Requirements AGENCY: Pipeline and Hazardous Materials Safety... tightening. A widely accepted industry guidance document, Gas Pipeline Technical Committee (GPTC) Guide, does...

  2. 77 FR 28669 - Pipeline Safety: Information Collection Activities, Excess Flow Valve Census

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-15

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2012-0086] Pipeline Safety: Information Collection Activities, Excess Flow Valve Census AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: Notice and request for...

  3. Airborne LIDAR Pipeline Inspection System (ALPIS) Mapping Tests

    DOT National Transportation Integrated Search

    2003-06-06

    Natural gas and hazardous liquid pipeline operators have a need to identify where leaks are occurring along their pipelines in order to lower the risks the pipelines pose to people and the environment. Current methods of locating natural gas and haza...

  4. 77 FR 34457 - Pipeline Safety: Mechanical Fitting Failure Reports

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... notice provides clarification to owners and operators of gas distribution pipeline facilities when... of a gas distribution pipeline facility to file a written report for any mechanical fitting failure...

  5. 77 FR 61826 - Pipeline Safety: Communication During Emergency Situations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-11

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... liquefied natural gas pipeline facilities that operators should immediately and directly notify the Public.... Background Federal regulations for gas, liquefied natural gas (LNG), and hazardous liquid pipeline facilities...

  6. 75 FR 5536 - Pipeline Safety: Control Room Management/Human Factors, Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-03

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Parts...: Control Room Management/Human Factors, Correction AGENCY: Pipeline and Hazardous Materials Safety... following correcting amendments: PART 192--TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM...

  7. The Vulnerability Formation Mechanism and Control Strategy of the Oil and Gas Pipeline City

    NASA Astrophysics Data System (ADS)

    Chen, Y. L.; Han, L.

    2017-12-01

    Most of the pipelines of oil and gas pipelines in our country have been for more than 25 years. These pipes are buried underground and was difficult to daily test. In addition, it was vulnerable to environmental, corrosion and natural disasters, So there is a hidden nature of accidents. The rapid development of urbanization, population accumulation, dense building and insufficient safety range are all the reasons for the frequent accidents of oil and gas pipelines. Therefore, to appraise and know the safe condition of the city various regions oil and gas pipelines is vital significant. In order to ensure the safety of oil and gas pipeline city, this paper defines the connotation of oil and gas pipeline city vulnerability according to the previous research on vulnerability. Then from three perspectives of environment, structure and behavior, based on the analytical paradigm of “structure—vulnerability conduct—performance” about oil and gas, the influential indicators of vulnerable oil and gas pipelines were analysed, the vulnerability mechanism framework of Oil and gas pipeline city was also constructed. Finally, the paper proposed the regulating strategy of the vulnerability of the oil and gas pipeline city to decrease its vulnerability index, which can be realize the city’s vulnerability evaluation and provides new ideas for the sustainable development of the city.

  8. Final Report For The Erosion And Corrosion Analysis Of Waste Transfer Primary Pipeline Sections From 241-SY Tank Farm

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Page, J. S.; Wyrwas, R. B.; Cooke, G. A.

    Three sections of primary transfer pipeline removed from the 241-SY Tank Farm in Hanford's 200 West area, labeled as SN-285, SN-286, and SN-278, were analyzed for the presence and amount of corrosion and erosion on the inside surface of the transfer pipe. All three sections of pipe, ranging in length between 6 and 8 in., were received at the 222-S Laboratory still in the pipe-in-pipe assembly. The annular spaces were filled with urethane foam injected into the pipes for as low as reasonably achievable (ALARA) purposes. The 3-in. primary transfer pipes were first separated from the outer encasement, 6-in. pipes.more » The pipes were cut into small sections, or coupons, based upon the results of a non-destructive pipe wall thickness measurement which used an ultrasonic transducer. Following removal of the foam, the coupons were subjected to a series of analytical methods utilizing both optical microscopy and scanning electron microscopy to obtain erosion and corrosion information. The ultrasonic transducer analysis of the SN-285 primary pipe did not show any thinned locations in the pipe wall which were outside the expected range for the 3-in. schedule 40 pipe of 216 mils. A coupon was cut from the thinnest area on the pipe, and analysis of the inside surface, which was in contact with the tank waste, revealed a continuous layer of corrosion ~ 100 11m (4 mils) thick under a semi-continuous layer of tank waste residue ~ 20 11m (1 mil) thick. This residue layer was composed of an amorphous phase rich in chromium, magnesium, calcium, and chlorine. Small pits were detected throughout the inside pipe surface with depths up to ~ 50 11m (2 mils). Similarly, the SN-286 primary pipe did not show, by the ultrasonic transducer measurements, any thinned locations in the pipe wall which were outside the expected range for this pipe. Analysis of the coupon cut from the pipe section showed the presence of a tank waste layer containing sodium aluminate and phases rich in iron, calcium, and chromium. This layer was removed by a cleaning process that left a pipe surface continuous in iron oxide/hydroxide (corrosion) with pockets of aluminum oxide, possibly gibbsite. The corrosion layer was ~ 50 11m (2 mil) thick over non-continuous pits less than ~ 50 11m deep (2 mils). Small particles of aluminum oxide were also detected under the corrosion layer. The ultrasonic transducer analysis of SN-278, like the previous primary pipes, did not reveal any noticeable thinning of the pipe wall. Analysis of the coupon cut from the pipe showed that the inside surface had a layer of tank waste residue that was partially detached from the pipe wall. This layer was easily scraped from the surface and was composed of two separate layers. The underlying layer was ~ 350 11m (14 mils) thick and composed of a cementation of small aluminum oxide (probably gibbsite) particles. A thinner layer on top of the aluminum oxide layer was rich in carbon and chlorine. Scattered pitting was observed on the inside pipe surface with one pit as deep as 200 11m (8 mils).« less

  9. Application of Remote-Field Eddy Current Testing to Inspection of Unpiggable Pipelines

    DOT National Transportation Integrated Search

    2003-07-02

    Corrosion of buried pipelines can lead to catastrophic failure. Many pipelines are successfully inspected by magnetic flux leakage (MFL) pigs to detect corrosion. However, there is a subset of pipelines for which MFL is not feasible. To inspect those...

  10. 75 FR 36615 - Pipeline Safety: Information Collection Gas Distribution Annual Report Form

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-28

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part 192 [Docket No. PHMSA-RSPA-2004-19854] Pipeline Safety: Information Collection Gas Distribution Annual Report Form AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: Request...

  11. 75 FR 48593 - Pipeline Safety: Periodic Updates of Regulatory References to Technical Standards and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-11

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Parts... AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), Department of Transportation (DOT... action allows pipeline operators to use current technologies, improved materials, and updated industry...

  12. 49 CFR 191.27 - Filing offshore pipeline condition reports.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE; ANNUAL REPORTS, INCIDENT REPORTS, AND SAFETY-RELATED..., job title, and business telephone number of person submitting the report. (4) Total length of pipeline...

  13. 76 FR 48834 - Michigan Consolidated Gas Company and Dawn Gateway Pipeline, LLC; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-09

    ...'s Belle River-St. Clair Pipeline into the new 21-mile long Dawn Gateway Pipeline system, which... & Optimization, DTE Pipeline/Dawn Gateway LLC, One Energy Plaza, Detroit, MI 48226, phone (313) 235-6531 or e...

  14. 76 FR 68828 - Pipeline Safety: Emergency Responder Forum

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-07

    ... PHMSA-2011-0295] Pipeline Safety: Emergency Responder Forum AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: Notice of Forum. SUMMARY: PHMSA is co-sponsoring a one-day Emergency Responder Forum with the National Association of Pipeline Safety Representatives and the United...

  15. 49 CFR 192.1001 - What definitions apply to this subpart?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Gas Distribution Pipeline... liquefied petroleum gas (LPG) distribution pipeline that serves fewer than 100 customers from a single...

  16. 77 FR 75699 - Pipeline Safety: Reporting of Exceedances of Maximum Allowable Operating Pressure

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-21

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA); DOT. ACTION: Notice; Issuance of... occurs. This reporting requirement is applicable to all gas transmission pipeline facility owners and...

  17. 49 CFR 192.901 - What do the regulations in this subpart cover?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Gas... pipeline covered under this part. For gas transmission pipelines constructed of plastic, only the...

  18. 78 FR 34703 - Pipeline Safety: Information Collection Activities, Revision to Gas Distribution Annual Report

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-10

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2013-0004] Pipeline Safety: Information Collection Activities, Revision to Gas Distribution Annual Report AGENCY: Pipeline and Hazardous Materials Safety Administration, DOT. ACTION: Notice and request...

  19. Creation and Implementation of a Workforce Development Pipeline Program at MSFC

    NASA Technical Reports Server (NTRS)

    Hix, Billy

    2003-01-01

    Within the context of NASA's Education Programs, this Workforce Development Pipeline guide describes the goals and objectives of MSFC's Workforce Development Pipeline Program as well as the principles and strategies for guiding implementation. It is designed to support the initiatives described in the NASA Implementation Plan for Education, 1999-2003 (EP-1998-12-383-HQ) and represents the vision of the members of the Education Programs office at MSFC. This document: 1) Outlines NASA s Contribution to National Priorities; 2) Sets the context for the Workforce Development Pipeline Program; 3) Describes Workforce Development Pipeline Program Strategies; 4) Articulates the Workforce Development Pipeline Program Goals and Aims; 5) List the actions to build a unified approach; 6) Outlines the Workforce Development Pipeline Programs guiding Principles; and 7) The results of implementation.

  20. Detection test of wireless network signal strength and GPS positioning signal in underground pipeline

    NASA Astrophysics Data System (ADS)

    Li, Li; Zhang, Yunwei; Chen, Ling

    2018-03-01

    In order to solve the problem of selecting positioning technology for inspection robot in underground pipeline environment, the wireless network signal strength and GPS positioning signal testing are carried out in the actual underground pipeline environment. Firstly, the strength variation of the 3G wireless network signal and Wi-Fi wireless signal provided by China Telecom and China Unicom ground base stations are tested, and the attenuation law of these wireless signals along the pipeline is analyzed quantitatively and described. Then, the receiving data of the GPS satellite signal in the pipeline are tested, and the attenuation of GPS satellite signal under underground pipeline is analyzed. The testing results may be reference for other related research which need to consider positioning in pipeline.

  1. Improving Spleen Volume Estimation via Computer Assisted Segmentation on Clinically Acquired CT Scans

    PubMed Central

    Xu, Zhoubing; Gertz, Adam L.; Burke, Ryan P.; Bansal, Neil; Kang, Hakmook; Landman, Bennett A.; Abramson, Richard G.

    2016-01-01

    OBJECTIVES Multi-atlas fusion is a promising approach for computer-assisted segmentation of anatomical structures. The purpose of this study was to evaluate the accuracy and time efficiency of multi-atlas segmentation for estimating spleen volumes on clinically-acquired CT scans. MATERIALS AND METHODS Under IRB approval, we obtained 294 deidentified (HIPAA-compliant) abdominal CT scans on 78 subjects from a recent clinical trial. We compared five pipelines for obtaining splenic volumes: Pipeline 1–manual segmentation of all scans, Pipeline 2–automated segmentation of all scans, Pipeline 3–automated segmentation of all scans with manual segmentation for outliers on a rudimentary visual quality check, Pipelines 4 and 5–volumes derived from a unidimensional measurement of craniocaudal spleen length and three-dimensional splenic index measurements, respectively. Using Pipeline 1 results as ground truth, the accuracy of Pipelines 2–5 (Dice similarity coefficient [DSC], Pearson correlation, R-squared, and percent and absolute deviation of volume from ground truth) were compared for point estimates of splenic volume and for change in splenic volume over time. Time cost was also compared for Pipelines 1–5. RESULTS Pipeline 3 was dominant in terms of both accuracy and time cost. With a Pearson correlation coefficient of 0.99, average absolute volume deviation 23.7 cm3, and 1 minute per scan, Pipeline 3 yielded the best results. The second-best approach was Pipeline 5, with a Pearson correlation coefficient 0.98, absolute deviation 46.92 cm3, and 1 minute 30 seconds per scan. Manual segmentation (Pipeline 1) required 11 minutes per scan. CONCLUSION A computer-automated segmentation approach with manual correction of outliers generated accurate splenic volumes with reasonable time efficiency. PMID:27519156

  2. Risk Analysis using Corrosion Rate Parameter on Gas Transmission Pipeline

    NASA Astrophysics Data System (ADS)

    Sasikirono, B.; Kim, S. J.; Haryadi, G. D.; Huda, A.

    2017-05-01

    In the oil and gas industry, the pipeline is a major component in the transmission and distribution process of oil and gas. Oil and gas distribution process sometimes performed past the pipeline across the various types of environmental conditions. Therefore, in the transmission and distribution process of oil and gas, a pipeline should operate safely so that it does not harm the surrounding environment. Corrosion is still a major cause of failure in some components of the equipment in a production facility. In pipeline systems, corrosion can cause failures in the wall and damage to the pipeline. Therefore it takes care and periodic inspections or checks on the pipeline system. Every production facility in an industry has a level of risk for damage which is a result of the opportunities and consequences of damage caused. The purpose of this research is to analyze the level of risk of 20-inch Natural Gas Transmission Pipeline using Risk-based inspection semi-quantitative based on API 581 associated with the likelihood of failure and the consequences of the failure of a component of the equipment. Then the result is used to determine the next inspection plans. Nine pipeline components were observed, such as a straight pipes inlet, connection tee, and straight pipes outlet. The risk assessment level of the nine pipeline’s components is presented in a risk matrix. The risk level of components is examined at medium risk levels. The failure mechanism that is used in this research is the mechanism of thinning. Based on the results of corrosion rate calculation, remaining pipeline components age can be obtained, so the remaining lifetime of pipeline components are known. The calculation of remaining lifetime obtained and the results vary for each component. Next step is planning the inspection of pipeline components by NDT external methods.

  3. ML-o-Scope: A Diagnostic Visualization System for Deep Machine Learning Pipelines

    DTIC Science & Technology

    2014-05-16

    ML-o-scope: a diagnostic visualization system for deep machine learning pipelines Daniel Bruckner Electrical Engineering and Computer Sciences... machine learning pipelines 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f...the system as a support for tuning large scale object-classification pipelines. 1 Introduction A new generation of pipelined machine learning models

  4. 49 CFR 192.921 - How is the baseline assessment to be conducted?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Gas... the covered pipeline segments for the baseline assessment according to a risk analysis that considers...

  5. 76 FR 22944 - Pipeline Safety: Notice of Public Webinars on Implementation of Distribution Integrity Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-25

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID... Management Programs AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION... Nation's gas distribution pipeline systems through development of inspection methods and guidance for the...

  6. 75 FR 56972 - Pipeline Safety: Control Room Management/Human Factors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-17

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Parts... Factors AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA); DOT. ACTION: Notice of...: Background There are roughly 170,000 miles of hazardous liquid pipelines, 295,000 miles of gas transmission...

  7. 77 FR 72435 - Pipeline Safety: Using Meaningful Metrics in Conducting Integrity Management Program Evaluations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-05

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... Evaluations AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: Notice... improve performance. For gas transmission pipelines, Sec. Sec. 192.911(i) and 192.945 define the...

  8. 49 CFR 192.935 - What additional preventive and mitigative measures must an operator take?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Gas Transmission Pipeline Integrity Management § 192.935 What additional preventive and mitigative...

  9. 75 FR 15485 - Pipeline Safety: Workshop on Guidelines for Integrity Assessment of Cased Pipe

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-29

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID...: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: Notice of workshop. SUMMARY... ``Guidelines for Integrity Assessment of Cased Pipe in Gas Transmission Pipelines'' and related Frequently...

  10. Design, Construction and Demonstration of a Robotic Platform for the Inspection of Unpiggable Pipelines under Live Conditions (#146)

    DOT National Transportation Integrated Search

    2011-05-01

    The 2002 Office of Pipeline Safety (OPS) regulations requiring the inspection of all transmission pipelines, including those that are now deemed "unpiggable", triggered the search for technologies that would make the inspection of unpiggable pipeline...

  11. 78 FR 26057 - Extension of Agency Information Collection Activity Under OMB Review: Pipeline Corporate Security...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... Information Collection Activity Under OMB Review: Pipeline Corporate Security Review AGENCY: Transportation.... Information Collection Requirement Title: Pipeline Corporate Security Review (PCSR). Type of Request... current industry security practices through its Pipeline Corporate Security Review (PCSR) program. The...

  12. Pipeline safety : the office of pipeline safety is changing how it oversees the pipeline industry

    DOT National Transportation Integrated Search

    2000-05-01

    Pipelines are inherently safer to the public than other modes of freight transportation for natural gas and hazardous liquids (such as oil products) because they are, for the most part, located underground. Nevertheless, the volatile nature of these ...

  13. Pipeline Safety: The Office of Pipeline Safety Is Changing How It Oversees the Pipeline Industry

    DOT National Transportation Integrated Search

    2000-05-01

    Pipelines are inherently safer to the public than other modes of freight transportation for natural gas and hazardous liquids (such as oil products) because they are, for the most part, located underground. Nevertheless, the volatile nature of these ...

  14. 75 FR 22678 - Pipeline Safety: Implementation of Electronic Filing for Recently Revised Incident/Accident...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-29

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... Liquid Systems AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: Notice; Issuance of Advisory Bulletin. SUMMARY: This notice advises owners and operators of gas pipeline...

  15. 49 CFR 192.931 - How may Confirmatory Direct Assessment (CDA) be used?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Gas Transmission Pipeline Integrity Management § 192.931 How may Confirmatory Direct Assessment (CDA) be used? An...

  16. 77 FR 17119 - Pipeline Safety: Cast Iron Pipe (Supplementary Advisory Bulletin)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-23

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... national attention and highlight the need for continued safety improvements to aging gas pipeline systems... 26, 1992) covering the continued use of cast iron pipe in natural gas distribution pipeline systems...

  17. 77 FR 45417 - Notice of Availability of Draft Environmental Assessment for Public Comment for the Longhorn...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-31

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID... Longhorn Pipeline Reversal Project AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA... Parts 1500-1508, the Pipeline and Hazardous Materials Safety Administration (PHMSA) is announcing the...

  18. 78 FR 6402 - Pipeline Safety: Accident and Incident Notification Time Limit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-30

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No.... SUMMARY: Owners and operators of gas and hazardous liquid pipeline systems and liquefied natural gas (LNG... operators of gas and hazardous liquids pipeline systems and LNG facilities that, ``at the earliest...

  19. Landslide and Land Subsidence Hazards to Pipelines

    USGS Publications Warehouse

    Baum, Rex L.; Galloway, Devin L.; Harp, Edwin L.

    2008-01-01

    Landslides and land subsidence pose serious hazards to pipelines throughout the world. Many existing pipeline corridors and more and more new pipelines cross terrain that is affected by either landslides, land subsidence, or both. Consequently the pipeline industry recognizes a need for increased awareness of methods for identifying and evaluating landslide and subsidence hazard for pipeline corridors. This report was prepared in cooperation with the U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration, and Pipeline Research Council International through a cooperative research and development agreement (CRADA) with DGH Consulting, Inc., to address the need for up-to-date information about current methods to identify and assess these hazards. Chapters in this report (1) describe methods for evaluating landslide hazard on a regional basis, (2) describe the various types of land subsidence hazard in the United States and available methods for identifying and quantifying subsidence, and (3) summarize current methods for investigating individual landslides. In addition to the descriptions, this report provides information about the relative costs, limitations and reliability of various methods.

  20. Sub-soil contamination due to oil spills in zones surrounding oil pipeline-pump stations and oil pipeline right-of-ways in Southwest-Mexico.

    PubMed

    Iturbe, Rosario; Flores, Carlos; Castro, Alejandrina; Torres, Luis G

    2007-10-01

    Oil spills due to oil pipelines is a very frequent problem in Mexico. Petroleos Mexicanos (PEMEX), very concerned with the environmental agenda, has been developing inspection and correction plans for zones around oil pipelines pumping stations and pipeline right-of-way. These stations are located at regular intervals of kilometres along the pipelines. In this study, two sections of an oil pipeline and two pipeline pumping stations zones are characterized in terms of the presence of Total Petroleum Hydrocarbons (TPHs) and Polycyclic Aromatic Hydrocarbons (PAHs). The study comprehends sampling of the areas, delimitation of contamination in the vertical and horizontal extension, analysis of the sampled soils regarding TPHs content and, in some cases, the 16 PAHs considered as priority by USEPA, calculation of areas and volumes contaminated (according to Mexican legislation, specifically NOM-EM-138-ECOL-2002) and, finally, a proposal for the best remediation techniques suitable for the contamination levels and the localization of contaminants.

  1. Numerical Simulation of Pipeline Deformation Caused by Rockfall Impact

    PubMed Central

    Liang, Zheng; Han, Chuanjun

    2014-01-01

    Rockfall impact is one of the fatal hazards in pipeline transportation of oil and gas. The deformation of oil and gas pipeline caused by rockfall impact was investigated using the finite element method in this paper. Pipeline deformations under radial impact, longitudinal inclined impact, transverse inclined impact, and lateral eccentric impact of spherical and cube rockfalls were discussed, respectively. The effects of impact angle and eccentricity on the plastic strain of pipeline were analyzed. The results show that the crater depth on pipeline caused by spherical rockfall impact is deeper than by cube rockfall impact with the same volume. In the inclined impact condition, the maximum plastic strain of crater caused by spherical rockfall impact appears when incidence angle α is 45°. The pipeline is prone to rupture under the cube rockfall impact when α is small. The plastic strain distribution of impact crater is more uneven with the increasing of impact angle. In the eccentric impact condition, plastic strain zone of pipeline decreases with the increasing of eccentricity k. PMID:24959599

  2. Compacting biomass waste materials for use as fuel

    NASA Astrophysics Data System (ADS)

    Zhang, Ou

    Every year, biomass waste materials are produced in large quantity. The combustibles in biomass waste materials make up over 70% of the total waste. How to utilize these waste materials is important to the nation and the world. The purpose of this study is to test optimum processes and conditions of compacting a number of biomass waste materials to form a densified solid fuel for use at coal-fired power plants or ordinary commercial furnaces. Successful use of such fuel as a substitute for or in cofiring with coal not only solves a solid waste disposal problem but also reduces the release of some gases from burning coal which cause health problem, acid rain and global warming. The unique punch-and-die process developed at the Capsule Pipeline Research Center, University of Missouri-Columbia was used for compacting the solid wastes, including waste paper, plastics (both film and hard products), textiles, leaves, and wood. The compaction was performed to produce strong compacts (biomass logs) under room temperature without binder and without preheating. The compaction conditions important to the commercial production of densified biomass fuel logs, including compaction pressure, pressure holding time, back pressure, moisture content, particle size, binder effects, and mold conditions were studied and optimized. The properties of the biomass logs were evaluated in terms of physical, mechanical, and combustion characteristics. It was found that the compaction pressure and the initial moisture content of the biomass material play critical roles in producing high-quality biomass logs. Under optimized compaction conditions, biomass waste materials can be compacted into high-quality logs with a density of 0.8 to 1.2 g/cm3. The logs made from the combustible wastes have a heating value in the range 6,000 to 8,000 Btu/lb which is only slightly (10 to 30%) less than that of subbituminous coal. To evaluate the feasibility of cofiring biomass logs with coal, burn tests were conducted in a stoke boiler. A separate burning test was also carried out by burning biomass logs alone in an outdoor hot-water furnace for heating a building. Based on a previous coal compaction study, the process of biomass compaction was studied numerically by use of a non-linear finite element code. A constitutive model with sufficient generality was adapted for biomass material to deal with pore contraction during compaction. A contact node algorithm was applied to implement the effect of mold wall friction into the finite element program. Numerical analyses were made to investigate the pressure distribution in a die normal to the axis of compaction, and to investigate the density distribution in a biomass log after compaction. The results of the analyses gave generally good agreement with theoretical analysis of coal log compaction, although assumptions had to be made about the variation in the elastic modulus of the material and the Poisson's ratio during the compaction cycle.

  3. The Very Large Array Data Processing Pipeline

    NASA Astrophysics Data System (ADS)

    Kent, Brian R.; Masters, Joseph S.; Chandler, Claire J.; Davis, Lindsey E.; Kern, Jeffrey S.; Ott, Juergen; Schinzel, Frank K.; Medlin, Drew; Muders, Dirk; Williams, Stewart; Geers, Vincent C.; Momjian, Emmanuel; Butler, Bryan J.; Nakazato, Takeshi; Sugimoto, Kanako

    2018-01-01

    We present the VLA Pipeline, software that is part of the larger pipeline processing framework used for the Karl G. Jansky Very Large Array (VLA), and Atacama Large Millimeter/sub-millimeter Array (ALMA) for both interferometric and single dish observations.Through a collection of base code jointly used by the VLA and ALMA, the pipeline builds a hierarchy of classes to execute individual atomic pipeline tasks within the Common Astronomy Software Applications (CASA) package. Each pipeline task contains heuristics designed by the team to actively decide the best processing path and execution parameters for calibration and imaging. The pipeline code is developed and written in Python and uses a "context" structure for tracking the heuristic decisions and processing results. The pipeline "weblog" acts as the user interface in verifying the quality assurance of each calibration and imaging stage. The majority of VLA scheduling blocks above 1 GHz are now processed with the standard continuum recipe of the pipeline and offer a calibrated measurement set as a basic data product to observatory users. In addition, the pipeline is used for processing data from the VLA Sky Survey (VLASS), a seven year community-driven endeavor started in September 2017 to survey the entire sky down to a declination of -40 degrees at S-band (2-4 GHz). This 5500 hour next-generation large radio survey will explore the time and spectral domains, relying on pipeline processing to generate calibrated measurement sets, polarimetry, and imaging data products that are available to the astronomical community with no proprietary period. Here we present an overview of the pipeline design philosophy, heuristics, and calibration and imaging results produced by the pipeline. Future development will include the testing of spectral line recipes, low signal-to-noise heuristics, and serving as a testing platform for science ready data products.The pipeline is developed as part of the CASA software package by an international consortium of scientists and software developers based at the National Radio Astronomical Observatory (NRAO), the European Southern Observatory (ESO), and the National Astronomical Observatory of Japan (NAOJ).

  4. Seismic hazard exposure for the Trans-Alaska Pipeline

    USGS Publications Warehouse

    Cluff, L.S.; Page, R.A.; Slemmons, D.B.; Grouse, C.B.; ,

    2003-01-01

    The discovery of oil on Alaska's North Slope and the construction of a pipeline to transport that oil across Alaska coincided with the National Environmental Policy Act of 1969 and a destructive Southern California earthquake in 1971 to cause stringent stipulations, state-of-the-art investigations, and innovative design for the pipeline. The magnitude 7.9 earthquake on the Denali fault in November 2002 was remarkably consistent with the design earthquake and fault displacement postulated for the Denali crossing of the Trans-Alaska Pipeline route. The pipeline maintained its integrity, and disaster was averted. Recent probabilistic studies to update previous hazard exposure conclusions suggest continuing pipeline integrity.

  5. The Brackets Design and Stress Analysis of a Refinery's Hot Water Pipeline

    NASA Astrophysics Data System (ADS)

    Zhou, San-Ping; He, Yan-Lin

    2016-05-01

    The reconstruction engineering which reconstructs the hot water pipeline from a power station to a heat exchange station requires the new hot water pipeline combine with old pipe racks. Taking the allowable span calculated based on GB50316 and the design philosophy of the pipeline supports into account, determine the types and locations of brackets. By analyzing the stresses of the pipeline in AutoPIPE, adjusting the supports at dangerous segments, recalculating in AutoPIPE, at last determine the types, locations and numbers of supports reasonably. Then the overall pipeline system will satisfy the requirement of the ASME B31.3.

  6. The Hyper Suprime-Cam software pipeline

    NASA Astrophysics Data System (ADS)

    Bosch, James; Armstrong, Robert; Bickerton, Steven; Furusawa, Hisanori; Ikeda, Hiroyuki; Koike, Michitaro; Lupton, Robert; Mineo, Sogo; Price, Paul; Takata, Tadafumi; Tanaka, Masayuki; Yasuda, Naoki; AlSayyad, Yusra; Becker, Andrew C.; Coulton, William; Coupon, Jean; Garmilla, Jose; Huang, Song; Krughoff, K. Simon; Lang, Dustin; Leauthaud, Alexie; Lim, Kian-Tat; Lust, Nate B.; MacArthur, Lauren A.; Mandelbaum, Rachel; Miyatake, Hironao; Miyazaki, Satoshi; Murata, Ryoma; More, Surhud; Okura, Yuki; Owen, Russell; Swinbank, John D.; Strauss, Michael A.; Yamada, Yoshihiko; Yamanoi, Hitomi

    2018-01-01

    In this paper, we describe the optical imaging data processing pipeline developed for the Subaru Telescope's Hyper Suprime-Cam (HSC) instrument. The HSC Pipeline builds on the prototype pipeline being developed by the Large Synoptic Survey Telescope's Data Management system, adding customizations for HSC, large-scale processing capabilities, and novel algorithms that have since been reincorporated into the LSST codebase. While designed primarily to reduce HSC Subaru Strategic Program (SSP) data, it is also the recommended pipeline for reducing general-observer HSC data. The HSC pipeline includes high-level processing steps that generate coadded images and science-ready catalogs as well as low-level detrending and image characterizations.

  7. 49 CFR 191.13 - Distribution systems reporting transmission pipelines; transmission or gathering systems...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Distribution systems reporting transmission pipelines; transmission or gathering systems reporting distribution pipelines. 191.13 Section 191.13 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF...

  8. Experience gained from the use of polyurethane foam-insulated pipelines at OAO Moscow Heating-Network Company

    NASA Astrophysics Data System (ADS)

    Kashinskii, V. I.; Lipovskikh, V. M.; Rotmistrov, Ya. G.

    2007-07-01

    Results from 10 years of experience using polyurethane foam-insulated pipelines at OAO Moscow Heating-Network Co. are presented. It is shown that the failure rate of such pipelines is considerably lower than that of pipelines laid in conduits.

  9. 77 FR 10415 - Standards for Business Practices for Interstate Natural Gas Pipelines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-22

    ...] Standards for Business Practices for Interstate Natural Gas Pipelines AGENCY: Federal Energy Regulatory... American Energy Standards Board (NAESB) applicable to natural gas pipelines.\\1\\ The Commission also... Quadrant (WGQ) of the North American Energy Standards Board (NAESB) applicable to natural gas pipelines...

  10. 78 FR 44900 - Communication of Operational Information Between Natural Gas Pipelines and Electric Transmission...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-25

    ...-17-000] Communication of Operational Information Between Natural Gas Pipelines and Electric... the Commission's regulations to provide explicit authority to interstate natural gas pipelines and... explicit authority to interstate natural gas pipelines and public utilities that own, operate, or control...

  11. The value of pipelines to the transportation system of Texas : year one report

    DOT National Transportation Integrated Search

    2000-10-01

    Pipelines represent a major transporter of petrochemical commodities in Texas. The Texas pipeline system represents as much as 17% of the total pipeline mileage in the U.S. and links many segments of the country with energy sources located on the Gul...

  12. 49 CFR 192.925 - What are the requirements for using External Corrosion Direct Assessment (ECDA)?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Gas Transmission Pipeline Integrity Management § 192.925 What are the requirements for using...

  13. 49 CFR 192.911 - What are the elements of an integrity management program?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Gas Transmission Pipeline Integrity Management § 192.911 What are the elements of an integrity management program...

  14. 75 FR 35632 - Transparency Provisions of Section 23 of the Natural Gas Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-23

    ... pipeline- quality natural gas. For instance, some Respondents questioned whether pipeline-quality natural gas that is sold directly into an interstate or intrastate natural gas pipeline without processing... reported transactions of pipeline-quality gas under the assumption that ``unprocessed natural gas'' was...

  15. 49 CFR 192.933 - What actions must be taken to address integrity issues?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Gas Transmission Pipeline Integrity Management § 192.933 What actions must be taken to address integrity issues? (a...

  16. 75 FR 14243 - Pipeline Safety: Girth Weld Quality Issues Due to Improper Transitioning, Misalignment, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-24

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No..., and Welding Practices of Large Diameter Line Pipe AGENCY: Pipeline and Hazardous Materials Safety... bulletin to notify owners and operators of recently constructed large diameter natural gas pipeline and...

  17. 49 CFR 195.557 - Which pipelines must have coating for external corrosion control?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... corrosion control? 195.557 Section 195.557 Transportation Other Regulations Relating to Transportation...) PIPELINE SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Corrosion Control § 195.557 Which pipelines must have coating for external corrosion control? Except bottoms of aboveground breakout tanks, each...

  18. 49 CFR 195.557 - Which pipelines must have coating for external corrosion control?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... corrosion control? 195.557 Section 195.557 Transportation Other Regulations Relating to Transportation...) PIPELINE SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Corrosion Control § 195.557 Which pipelines must have coating for external corrosion control? Except bottoms of aboveground breakout tanks, each...

  19. 49 CFR 195.557 - Which pipelines must have coating for external corrosion control?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... corrosion control? 195.557 Section 195.557 Transportation Other Regulations Relating to Transportation...) PIPELINE SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Corrosion Control § 195.557 Which pipelines must have coating for external corrosion control? Except bottoms of aboveground breakout tanks, each...

  20. 49 CFR 195.557 - Which pipelines must have coating for external corrosion control?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... corrosion control? 195.557 Section 195.557 Transportation Other Regulations Relating to Transportation...) PIPELINE SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Corrosion Control § 195.557 Which pipelines must have coating for external corrosion control? Except bottoms of aboveground breakout tanks, each...

  1. 30 CFR 250.1005 - Inspection requirements for DOI pipelines.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Inspection requirements for DOI pipelines. 250.1005 Section 250.1005 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR...-Way § 250.1005 Inspection requirements for DOI pipelines. (a) Pipeline routes shall be inspected at...

  2. 75 FR 73117 - New Agency Information Collection Activity Under OMB Review: Pipeline Corporate Security Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-29

    ... Collection Activity Under OMB Review: Pipeline Corporate Security Review AGENCY: Transportation Security.... Information Collection Requirement Title: Pipeline Corporate Security Review (PCSR). Type of Request: New collection. OMB Control Number: Not yet assigned. Form(s): Pipeline Corporate Security Review (PCSR) Protocol...

  3. 49 CFR 195.557 - Which pipelines must have coating for external corrosion control?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... corrosion control? 195.557 Section 195.557 Transportation Other Regulations Relating to Transportation...) PIPELINE SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Corrosion Control § 195.557 Which pipelines must have coating for external corrosion control? Except bottoms of aboveground breakout tanks, each...

  4. Lessons Learned from Developing and Operating the Kepler Science Pipeline and Building the TESS Science Pipeline

    NASA Technical Reports Server (NTRS)

    Jenkins, Jon M.

    2017-01-01

    The experience acquired through development, implementation and operation of the KeplerK2 science pipelines can provide lessons learned for the development of science pipelines for other missions such as NASA's Transiting Exoplanet Survey Satellite, and ESA's PLATO mission.

  5. 49 CFR 192.1009 - What must an operator report when compression couplings fail?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Gas Distribution Pipeline Integrity Management (IM) § 192.1009 What must an operator report when compression...

  6. 49 CFR 192.905 - How does an operator identify a high consequence area?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Gas Transmission Pipeline Integrity Management § 192.905 How does an operator identify a high consequence area? (a...

  7. 49 CFR 192.909 - How can an operator change its integrity management program?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Gas Transmission Pipeline Integrity Management § 192.909 How can an operator change its integrity management...

  8. 49 CFR 192.943 - When can an operator deviate from these reassessment intervals?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Gas Transmission Pipeline Integrity Management § 192.943 When can an operator deviate from these reassessment...

  9. 49 CFR 192.907 - What must an operator do to implement this subpart?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Gas Transmission Pipeline Integrity Management § 192.907 What must an operator do to implement this subpart? (a...

  10. 49 CFR 192.923 - How is direct assessment used and for what threats?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Gas Transmission Pipeline Integrity Management § 192.923 How is direct assessment used and for what threats? (a...

  11. A graph-based approach for designing extensible pipelines

    PubMed Central

    2012-01-01

    Background In bioinformatics, it is important to build extensible and low-maintenance systems that are able to deal with the new tools and data formats that are constantly being developed. The traditional and simplest implementation of pipelines involves hardcoding the execution steps into programs or scripts. This approach can lead to problems when a pipeline is expanding because the incorporation of new tools is often error prone and time consuming. Current approaches to pipeline development such as workflow management systems focus on analysis tasks that are systematically repeated without significant changes in their course of execution, such as genome annotation. However, more dynamism on the pipeline composition is necessary when each execution requires a different combination of steps. Results We propose a graph-based approach to implement extensible and low-maintenance pipelines that is suitable for pipeline applications with multiple functionalities that require different combinations of steps in each execution. Here pipelines are composed automatically by compiling a specialised set of tools on demand, depending on the functionality required, instead of specifying every sequence of tools in advance. We represent the connectivity of pipeline components with a directed graph in which components are the graph edges, their inputs and outputs are the graph nodes, and the paths through the graph are pipelines. To that end, we developed special data structures and a pipeline system algorithm. We demonstrate the applicability of our approach by implementing a format conversion pipeline for the fields of population genetics and genetic epidemiology, but our approach is also helpful in other fields where the use of multiple software is necessary to perform comprehensive analyses, such as gene expression and proteomics analyses. The project code, documentation and the Java executables are available under an open source license at http://code.google.com/p/dynamic-pipeline. The system has been tested on Linux and Windows platforms. Conclusions Our graph-based approach enables the automatic creation of pipelines by compiling a specialised set of tools on demand, depending on the functionality required. It also allows the implementation of extensible and low-maintenance pipelines and contributes towards consolidating openness and collaboration in bioinformatics systems. It is targeted at pipeline developers and is suited for implementing applications with sequential execution steps and combined functionalities. In the format conversion application, the automatic combination of conversion tools increased both the number of possible conversions available to the user and the extensibility of the system to allow for future updates with new file formats. PMID:22788675

  12. ORAC-DR: A generic data reduction pipeline infrastructure

    NASA Astrophysics Data System (ADS)

    Jenness, Tim; Economou, Frossie

    2015-03-01

    ORAC-DR is a general purpose data reduction pipeline system designed to be instrument and observatory agnostic. The pipeline works with instruments as varied as infrared integral field units, imaging arrays and spectrographs, and sub-millimeter heterodyne arrays and continuum cameras. This paper describes the architecture of the pipeline system and the implementation of the core infrastructure. We finish by discussing the lessons learned since the initial deployment of the pipeline system in the late 1990s.

  13. Discrete pre-processing step effects in registration-based pipelines, a preliminary volumetric study on T1-weighted images.

    PubMed

    Muncy, Nathan M; Hedges-Muncy, Ariana M; Kirwan, C Brock

    2017-01-01

    Pre-processing MRI scans prior to performing volumetric analyses is common practice in MRI studies. As pre-processing steps adjust the voxel intensities, the space in which the scan exists, and the amount of data in the scan, it is possible that the steps have an effect on the volumetric output. To date, studies have compared between and not within pipelines, and so the impact of each step is unknown. This study aims to quantify the effects of pre-processing steps on volumetric measures in T1-weighted scans within a single pipeline. It was our hypothesis that pre-processing steps would significantly impact ROI volume estimations. One hundred fifteen participants from the OASIS dataset were used, where each participant contributed three scans. All scans were then pre-processed using a step-wise pipeline. Bilateral hippocampus, putamen, and middle temporal gyrus volume estimations were assessed following each successive step, and all data were processed by the same pipeline 5 times. Repeated-measures analyses tested for a main effects of pipeline step, scan-rescan (for MRI scanner consistency) and repeated pipeline runs (for algorithmic consistency). A main effect of pipeline step was detected, and interestingly an interaction between pipeline step and ROI exists. No effect for either scan-rescan or repeated pipeline run was detected. We then supply a correction for noise in the data resulting from pre-processing.

  14. Pipeline corridors through wetlands - impacts on plant communities: Bayou Pointe Aux Chenes, Terrebonne Parish, Louisiana. Topical report, August 1991--April 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Van Dyke, G.D.; Shem, L.M.; Zimmerman, R.E.

    1994-12-01

    The goal of the Gas Research Institute Wetland Corridors Program is to document impacts of existing pipelines on the wetlands they traverse. To accomplish this goal, 12 existing wetland crossings were surveyed. These sites varied in elapsed time since pipeline construction, wetland type, pipeline installation techniques, and night- of-way management practices. This report presents the results of a survey conducted on August 22, 1991, in an emergent intertidal estuarine wetland in Terrebonne Parish, Louisiana. The site includes three pipelines installed between 1958 and 1969. Vegetation within the site comprises three native tidal marsh grasses: Spartina alterniflora, Spartina patens, and Distichlismore » spicata. All three species occurred over the pipelines, within the right-of-way and in both natural areas. Vegetative differences attributable to the installation or presence of the pipelines were not obvious over the pipelines or in the habitat east of the pipelines. However, because of the presence of a canal west of the 1969 pipeline, vegetation was less abundant in that area, and D. spicata was absent from all but the most distant plots of the transacts. Data obtained in the study indicate that when rights-of-way through brackish marsh are restored to their original elevations, they are revegetated with native vegetation similar to that in surrounding areas.« less

  15. Design and Operation of the World's First Long Distance Bauxite Slurry Pipeline

    NASA Astrophysics Data System (ADS)

    Gandhi, Ramesh; Weston, Mike; Talavera, Maru; Brittes, Geraldo Pereira; Barbosa, Eder

    Mineracão Bauxita Paragominas (MBP) is the first long distance slurry pipeline transporting bauxite slurry. Bauxite had developed a reputation for being difficult to hydraulically transport using long distance pipelines. This myth has now been proven wrong. The 245-km- long, 13.5 MTPY capacity MBP pipeline was designed and commissioned by PSI for CVRD. The pipeline is located in the State of Para, Brazil. The Miltonia bauxite mine is in a remote location with no other efficient means of transport. The bauxite slurry is delivered to Alunorte Alumina refinery located near Barcarena. This first of its kind pipeline required significant development work in order to assure technical and economic feasibility. This paper describes the technical aspects of design of the pipeline. It also summarizes the operating experience gained during the first year of operation.

  16. Main Pipelines Corrosion Monitoring Device

    NASA Astrophysics Data System (ADS)

    Anatoliy, Bazhenov; Galina, Bondareva; Natalia, Grivennaya; Sergey, Malygin; Mikhail, Goryainov

    2017-01-01

    The aim of the article is to substantiate the technical solution for the problem of monitoring corrosion changes in oil and gas pipelines with use (using) of an electromagnetic NDT method. Pipeline wall thinning under operating conditions can lead to perforations and leakage of the product to be transported outside the pipeline. In most cases there is danger for human life and environment. Monitoring of corrosion changes in pipeline inner wall under operating conditions is complicated because pipelines are mainly made of structural steels with conductive and magnetic properties that complicate test signal passage through the entire thickness of the object under study. The technical solution of this problem lies in monitoring of the internal corrosion changes in pipes under operating conditions in order to increase safety of pipelines by automated prediction of achieving the threshold pre-crash values due to corrosion.

  17. 49 CFR 192.620 - Alternative maximum allowable operating pressure for certain steel pipelines.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... for certain steel pipelines. 192.620 Section 192.620 Transportation Other Regulations Relating to... STANDARDS Operations § 192.620 Alternative maximum allowable operating pressure for certain steel pipelines..., 2, or 3 location; (2) The pipeline segment is constructed of steel pipe meeting the additional...

  18. Stress and Strain State Analysis of Defective Pipeline Portion

    NASA Astrophysics Data System (ADS)

    Burkov, P. V.; Burkova, S. P.; Knaub, S. A.

    2015-09-01

    The paper presents computer simulation results of the pipeline having defects in a welded joint. Autodesk Inventor software is used for simulation of the stress and strain state of the pipeline. Places of the possible failure and stress concentrators are predicted on the defective portion of the pipeline.

  19. 49 CFR 192.1013 - When may an operator deviate from required periodic inspections under this part?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Gas Distribution Pipeline Integrity Management (IM) § 192.1013 When may an operator...

  20. 49 CFR 192.1013 - When may an operator deviate from required periodic inspections under this part?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Gas Distribution Pipeline Integrity Management (IM) § 192.1013 When may an operator...

  1. 49 CFR 192.1013 - When may an operator deviate from required periodic inspections under this part?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Gas Distribution Pipeline Integrity Management (IM) § 192.1013 When may an operator...

  2. 49 CFR 195.452 - Pipeline integrity management in high consequence areas.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Pipeline integrity management in high consequence... Management § 195.452 Pipeline integrity management in high consequence areas. (a) Which pipelines are covered... by this section must: (1) Develop a written integrity management program that addresses the risks on...

  3. 49 CFR 195.452 - Pipeline integrity management in high consequence areas.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Pipeline integrity management in high consequence... Management § 195.452 Pipeline integrity management in high consequence areas. (a) Which pipelines are covered... by this section must: (1) Develop a written integrity management program that addresses the risks on...

  4. 49 CFR 195.452 - Pipeline integrity management in high consequence areas.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Pipeline integrity management in high consequence... Management § 195.452 Pipeline integrity management in high consequence areas. (a) Which pipelines are covered... by this section must: (1) Develop a written integrity management program that addresses the risks on...

  5. 77 FR 65508 - Annual Charge Filing Procedures for Natural Gas Pipelines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-29

    ...] Annual Charge Filing Procedures for Natural Gas Pipelines AGENCY: Federal Energy Regulatory Commission... FERC) is proposing to amend its regulations to revise the filing requirements for natural gas pipelines...) clause. Currently, natural gas pipelines utilizing an ACA clause must make a tariff filing to reflect a...

  6. 77 FR 43711 - Standards for Business Practices of Interstate Natural Gas Pipelines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-26

    ...; Order No. 587-V] Standards for Business Practices of Interstate Natural Gas Pipelines AGENCY: Federal... North American Energy Standards Board (NAESB) applicable to natural gas pipelines. In addition, based on... (WGQ) of the North American Energy Standards Board (NAESB) applicable to natural gas pipelines...

  7. 75 FR 63462 - Central New York Oil and Gas Company, LLC; Notice of Intent To Prepare an Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-15

    ... pipeline infrastructure to receive natural gas produced from Marcellus Shale production areas for delivery to existing interstate pipeline systems of Tennessee Gas Pipeline Company (TGP), CNYOG, and Transcontinental Gas Pipeline Corporation (Transco). It would also provide for bi-directional transportation...

  8. 49 CFR 192.913 - When may an operator deviate its program from certain requirements of this subpart?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Gas Transmission Pipeline Integrity Management § 192.913 When may an operator deviate its program...

  9. 78 FR 146 - Notice of Availability of Final Environmental Assessment and Finding of No Significant Impact for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-02

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID... Impact for the Longhorn Pipeline Reversal Project AGENCY: Pipeline and Hazardous Materials Safety... regulations, 40 CFR parts 1500-1508, the Pipeline and Hazardous Materials Safety Administration (PHMSA) is...

  10. 75 FR 80300 - Five-Year Review of Oil Pipeline Pricing Index

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-22

    .... On September 24, 2010, the U.S. Department of Transportation, Pipeline and Hazardous Materials Safety... pipeline cost changes for the 2004-2009 period: \\12\\ AOPL states that Dr. Shehadeh began his analysis using... typical pipeline operator. Valero states that Mr. O'Loughlin's analysis applied an objective filter which...

  11. 78 FR 49996 - Pipeline Safety: Periodic Updates of Regulatory References to Technical Standards and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-16

    ..., natural gas and other types of materials transported by pipeline, it is not possible to establish... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Parts..., Transportation of Natural and Other Gas by Pipeline: Minimum Federal Safety Standards; 49 CFR part 193, Liquefied...

  12. 76 FR 42163 - Pipeline Safety: Issuance of Draft Decision on Det Norske Veritas (USA), Inc.'s Petition for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-18

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2011-0075] Pipeline Safety: Issuance of Draft Decision on Det Norske Veritas (USA), Inc.'s...: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: Notice. SUMMARY: This notice...

  13. 76 FR 25576 - Pipeline Safety: Applying Safety Regulations to All Rural Onshore Hazardous Liquid Low-Stress Lines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-05

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part... to All Rural Onshore Hazardous Liquid Low-Stress Lines AGENCY: Pipeline and Hazardous Materials... burdensome to require operators of these pipelines to perform a complete ``could affect'' analysis to...

  14. 49 CFR 192.1013 - When may an operator deviate from required periodic inspections under this part?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Gas Distribution Pipeline Integrity Management (IM) § 192.1013 When may an operator...

  15. Development of a Free-Swimming Acoustic Tool for Liquid Pipeline Leak Detection Including Evaluation for Natural Gas Pipeline Applications

    DOT National Transportation Integrated Search

    2010-08-01

    Significant financial and environmental consequences often result from line leakage of oil product pipelines. Product can escape into the surrounding soil as even the smallest leak can lead to rupture of the pipeline. From a health perspective, water...

  16. 75 FR 5177 - Pipeline Posting Requirements under Section 23 of the Natural Gas Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-01

    .... The Commission denies requests to revise its regulations requiring interstate natural gas pipelines to... Pipeline Posting of No-Notice Service.... 94 H. Additional Exemptions 102 1. Natural Gas Companies With.... 720,\\1\\ requiring interstate and certain major non-interstate natural gas pipelines to post limited...

  17. 30 CFR 250.1004 - Safety equipment requirements for DOI pipelines.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Pipelines and Pipeline Rights-of... a flow safety valve (FSV). (ii) For sulphur operations, incoming pipelines delivering gas to the power plant platform may be equipped with high- and low-pressure sensors (PSHL), which activate audible...

  18. 49 CFR 195.567 - Which pipelines must have test leads and what must I do to install and maintain the leads?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Corrosion Control § 195.567 Which pipelines must have test leads and what must I do to install and maintain... corrosion control. However, this requirement does not apply until December 27, 2004 to pipelines or pipeline...

  19. 49 CFR 195.567 - Which pipelines must have test leads and what must I do to install and maintain the leads?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Corrosion Control § 195.567 Which pipelines must have test leads and what must I do to install and maintain... corrosion control. However, this requirement does not apply until December 27, 2004 to pipelines or pipeline...

  20. 49 CFR 195.567 - Which pipelines must have test leads and what must I do to install and maintain the leads?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Corrosion Control § 195.567 Which pipelines must have test leads and what must I do to install and maintain... corrosion control. However, this requirement does not apply until December 27, 2004 to pipelines or pipeline...

  1. 49 CFR 195.567 - Which pipelines must have test leads and what must I do to install and maintain the leads?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Corrosion Control § 195.567 Which pipelines must have test leads and what must I do to install and maintain... corrosion control. However, this requirement does not apply until December 27, 2004 to pipelines or pipeline...

  2. Sensor and transmitter system for communication in pipelines

    DOEpatents

    Cooper, John F.; Burnham, Alan K.

    2013-01-29

    A system for sensing and communicating in a pipeline that contains a fluid. An acoustic signal containing information about a property of the fluid is produced in the pipeline. The signal is transmitted through the pipeline. The signal is received with the information and used by a control.

  3. 75 FR 4134 - Pipeline Safety: Leak Detection on Hazardous Liquid Pipelines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-26

    ... http://dms.dot.gov . General information about the PHMSA Office of Pipeline Safety (OPS) can be... of leak detection by tracking product movement is essential to an understanding of line balance... pipelines, the line balance technique for leak detection can often be performed with manual calculations...

  4. 30 CFR 250.1001 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... used in this subpart shall have the meanings given below: DOI pipelines include: (1) Producer-operated...) Transporter-operated pipelines that DOI and DOT have agreed are to be regulated as DOI pipelines; and (5) All..., maintenance, and operation; (2) Producer-operated pipelines that DOI and DOT have agreed are to be regulated...

  5. 75 FR 67450 - Pipeline Safety: Control Room Management Implementation Workshop

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-02

    ... PHMSA-2010-0294] Pipeline Safety: Control Room Management Implementation Workshop AGENCY: Pipeline and...) on the implementation of pipeline control room management. The workshop is intended to foster an understanding of the Control Room Management Rule issued by PHMSA on December 3, 2009, and is open to the public...

  6. 49 CFR 192.755 - Protecting cast-iron pipelines.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Protecting cast-iron pipelines. 192.755 Section... NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Maintenance § 192.755 Protecting cast-iron pipelines. When an operator has knowledge that the support for a segment of a buried cast-iron...

  7. 40 CFR 761.250 - Sample site selection for pipeline section abandonment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 30 2010-07-01 2010-07-01 false Sample site selection for pipeline... Disposal of Natural Gas Pipeline: Selecting Sample Sites, Collecting Surface Samples, and Analyzing Standard PCB Wipe Samples § 761.250 Sample site selection for pipeline section abandonment. This procedure...

  8. 40 CFR 761.250 - Sample site selection for pipeline section abandonment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 31 2011-07-01 2011-07-01 false Sample site selection for pipeline... Disposal of Natural Gas Pipeline: Selecting Sample Sites, Collecting Surface Samples, and Analyzing Standard PCB Wipe Samples § 761.250 Sample site selection for pipeline section abandonment. This procedure...

  9. 49 CFR 192.619 - Maximum allowable operating pressure: Steel or plastic pipelines.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... plastic pipelines. 192.619 Section 192.619 Transportation Other Regulations Relating to Transportation... Operations § 192.619 Maximum allowable operating pressure: Steel or plastic pipelines. (a) No person may operate a segment of steel or plastic pipeline at a pressure that exceeds a maximum allowable operating...

  10. 77 FR 74179 - Stingray Pipeline Company, L.L.C.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-13

    ... Pipeline Company, L.L.C.; Notice of Application Take notice that on November 26, 2012, Stingray Pipeline Company, L.L.C. (Stingray), 1100 Louisiana, Suite 3300, Houston, Texas 77002, filed in the above... Roney, Manager--Regulatory Affairs, Stingray Pipeline Company, L.L.C., 1100 Louisiana, Suite 3300...

  11. National Pipeline Mapping System (NPMS) : standards for creating pipeline location data : standards for electronic data submissions, including metadata standards and examples

    DOT National Transportation Integrated Search

    1997-07-14

    These standards represent a guideline for preparing digital data for inclusion in the National Pipeline Mapping System Repository. The standards were created with input from the pipeline industry and government agencies. They address the submission o...

  12. 49 CFR 192.945 - What methods must an operator use to measure program effectiveness?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Gas Transmission Pipeline Integrity Management § 192.945 What methods must an operator use to measure program...

  13. 49 CFR 192.915 - What knowledge and training must personnel have to carry out an integrity management program?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Gas Transmission Pipeline Integrity Management § 192.915 What knowledge...

  14. 49 CFR 192.1007 - What are the required elements of an integrity management plan?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Gas... threats and risks to its gas distribution pipeline. (2) Consider the information gained from past design...

  15. 49 CFR 192.1005 - What must a gas distribution operator (other than a master meter or small LPG operator) do to...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Gas Distribution Pipeline Integrity Management (IM...

  16. 49 CFR 192.929 - What are the requirements for using Direct Assessment for Stress Corrosion Cracking (SCCDA)?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Gas Transmission Pipeline Integrity Management § 192.929 What are the...

  17. 75 FR 54864 - Combined Notice of Filings No. 2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-09

    ... Refund Report filings: Docket Numbers: RP10-1223-000. Applicants: Natural Gas Pipeline Company of America. Description: Natural Gas Pipeline Company of America LLC submits First Revised Sheet 405 et al. to FERC Gas...: RP10-1225-000. Applicants: Natural Gas Pipeline Company of America. Description: Natural Gas Pipeline...

  18. He-Ne and CW CO2 laser long-path systems for gas detection

    NASA Technical Reports Server (NTRS)

    Grant, W. B.

    1986-01-01

    This paper describes the design and testing of a laboratory prototype dual He-Ne laser system for the detection of methane leaks from underground pipelines and solid-waste landfill sites using differential absorption of radiation backscattered from topographic targets. A laboratory-prototype dual CW carbon dioxide laser system also using topographic backscatter is discussed, and measurement results for methanol are given. With both systems, it was observed that the time-varying differential absorption signal was useful in indicating the presence of a gas coming from a nearby source. Limitations to measurement sensitivity, especially the role of speckle and atmospheric turbulence, are described. The speckle results for hard targets are contrasted with those from atmospheric aerosols. The appendix gives appropriate laser lines and values of absorption coefficients for the hydrazine fuel gases.

  19. Discharge of oilfield-produced water in Nueces Bay, Texas: A case study

    USGS Publications Warehouse

    D'Unger, Claude; Chapman, Duane C.; Carr, R. Scott

    1996-01-01

    During oil and gas production, water is often extracted from geological formations along with the hydrocarbons. These “produced waters” have been discharged to Nueces Bay since the turn of the century. These effluents were found to be highly toxic, and sediments in the vicinity of the discharges were also toxic. We developed a map of wells and produced-water discharge sites in the vicinity of Nueces Bay and identified numerous unplugged wells suitable for conversion to produced water disposal wells. An economic analysis of conversion to subterranean injection of produced water indicates that most of the wells currently in production could pay out the cost of conversion to injection in one to three years. The use of one injection well for two or more water-producing wells could yield greater savings. Wells that could not support the cost of injection are small producers, and their loss would not constitute a major loss of jobs or dollars to the area. This study could serve as a useful model for evaluating the economic feasibility of conversion to injection in other areas of Texas and Louisiana.

  20. Violence in Brazilian schools: Analysis of the effect of the #Tamojunto prevention program for bullying and physical violence.

    PubMed

    Gusmões, Júlia D S P; Sañudo, Adriana; Valente, Juliana Y; Sanchez, Zila M

    2018-02-01

    A randomized controlled trial was conducted with 6637 7th- and 8th-grade students in 72 public schools in 6 Brazilian cities to evaluate the effects of the European drug prevention program Unplugged, called #Tamojunto in Brazil. This article evaluates the effects of #Tamojunto on the prevention of bullying and physical violence. Baseline data were collected from both intervention and control groups prior to program implementation. Follow-up data collection was performed 9 and 21 months later. Generalized estimating equations were used to evaluate changes in the reporting of receiving or practicing bullying and physical violence over time. The program was found to reduce the likelihood of receiving bullying, particularly in the stratum of girls aged 13-15 years at the 9-month follow-up time point. The effect was not sustained at 21 months. There was no significant effect for practicing bullying and for receiving or practicing physical violence. Copyright © 2017 The Foundation for Professionals in Services for Adolescents. Published by Elsevier Ltd. All rights reserved.

  1. Study of sleeper’s impact on the deep-water pipeline lateral global buckling

    NASA Astrophysics Data System (ADS)

    Liu, Wenbin; Li, Bin

    2017-08-01

    Pipelines are the most important transportation way for offshore oil and gas, and the lateral buckling is the main global buckling form for deep-water pipelines. The sleeper is an economic and efficient device to trigger the lateral buckling in preset location. This paper analyzed the lateral buckling features for on-bottom pipeline and pipeline with sleeper. The stress and strain variation during buckling process is shown to reveal the impact of sleeper on buckling.

  2. Alaska oil pipeline in retrospect

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Klein, D.R.

    Caribou have not adjusted as well as moose to the presence of the trans-Alaska pipeline. Research has shown that caribou have altered their movements and patterns and range use in relation to the pipeline corridor. Cows with calves show pronounced avoidance of the pipeline, road, and oil field. Traffic and human activity appear more directly responsible for avoidance behavior than does that physical presence of the pipeline, road, and facilities. Animals along the haul road are especially vulnerable to poaching because of the open terrain and the fact that many become tame during the peak of construction activity. Poaching, especiallymore » of furbearers, has increased as pipeline-related traffic has decreased.« less

  3. The Hyper Suprime-Cam software pipeline

    DOE PAGES

    Bosch, James; Armstrong, Robert; Bickerton, Steven; ...

    2017-10-12

    Here in this article, we describe the optical imaging data processing pipeline developed for the Subaru Telescope’s Hyper Suprime-Cam (HSC) instrument. The HSC Pipeline builds on the prototype pipeline being developed by the Large Synoptic Survey Telescope’s Data Management system, adding customizations for HSC, large-scale processing capabilities, and novel algorithms that have since been reincorporated into the LSST codebase. While designed primarily to reduce HSC Subaru Strategic Program (SSP) data, it is also the recommended pipeline for reducing general-observer HSC data. The HSC pipeline includes high-level processing steps that generate coadded images and science-ready catalogs as well as low-level detrendingmore » and image characterizations.« less

  4. The Hyper Suprime-Cam software pipeline

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bosch, James; Armstrong, Robert; Bickerton, Steven

    Here in this article, we describe the optical imaging data processing pipeline developed for the Subaru Telescope’s Hyper Suprime-Cam (HSC) instrument. The HSC Pipeline builds on the prototype pipeline being developed by the Large Synoptic Survey Telescope’s Data Management system, adding customizations for HSC, large-scale processing capabilities, and novel algorithms that have since been reincorporated into the LSST codebase. While designed primarily to reduce HSC Subaru Strategic Program (SSP) data, it is also the recommended pipeline for reducing general-observer HSC data. The HSC pipeline includes high-level processing steps that generate coadded images and science-ready catalogs as well as low-level detrendingmore » and image characterizations.« less

  5. Gas pipeline leakage detection based on PZT sensors

    NASA Astrophysics Data System (ADS)

    Zhu, Junxiao; Ren, Liang; Ho, Siu-Chun; Jia, Ziguang; Song, Gangbing

    2017-02-01

    In this paper, an innovative method for rapid detection and location determination of pipeline leakage utilizing lead zirconate titanate (PZT) sensors is proposed. The negative pressure wave (NPW) is a stress wave generated by leakage in the pipeline, and propagates along the pipeline from the leakage point to both ends. Thus the NPW is associated with hoop strain variation along the pipe wall. PZT sensors mounted on the pipeline were used to measure the strain variation and allowed accurate (within 2% error) and repeatable location (within 4% variance) of five manually controlled leakage points. Experimental results have verified the effectiveness and the location accuracy for leakage in a 55 meter long model pipeline.

  6. Environmental analysis for pipeline gas demonstration plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stinton, L.H.

    1978-09-01

    The Department of Energy (DOE) has implemented programs for encouraging the development and commercialization of coal-related technologies, which include coal gasification demonstration-scale activities. In support of commercialization activities the Environmental Analysis for Pipeline Gas Demonstration Plants has been prepared as a reference document to be used in evaluating potential environmental and socioeconomic effects from construction and operation of site- and process-specific projects. Effluents and associated impacts are identified for six coal gasification processes at three contrasting settings. In general, impacts from construction of a high-Btu gas demonstration plant are similar to those caused by the construction of any chemical plantmore » of similar size. The operation of a high-Btu gas demonstration plant, however, has several unique aspects that differentiate it from other chemical plants. Offsite development (surface mining) and disposal of large quantities of waste solids constitute important sources of potential impact. In addition, air emissions require monitoring for trace metals, polycyclic aromatic hydrocarbons, phenols, and other emissions. Potential biological impacts from long-term exposure to these emissions are unknown, and additional research and data analysis may be necessary to determine such effects. Possible effects of pollutants on vegetation and human populations are discussed. The occurrence of chemical contaminants in liquid effluents and the bioaccumulation of these contaminants in aquatic organisms may lead to adverse ecological impact. Socioeconomic impacts are similar to those from a chemical plant of equivalent size and are summarized and contrasted for the three surrogate sites.« less

  7. Pipeline for Contraceptive Development

    PubMed Central

    Blithe, Diana L.

    2016-01-01

    The high rates of unplanned pregnancy reflect unmet need for effective contraceptive methods for women, especially for individuals with health risks such as obesity, diabetes, hypertension, and other conditions that may contraindicate use of an estrogen-containing product. Improvements in safety, user convenience, acceptability and availability of products remain important goals of the contraceptive development program. Another important goal is to minimize the impact of the products on the environment. Development of new methods for male contraception has the potential to address many of these issues with regard to safety for women who have contraindications to effective contraceptive methods but want to protect against pregnancy. It also will address a huge unmet need for men who want to control their fertility. Products under development for men would not introduce eco-toxic hormones in the waste water. Investment in contraceptive research to identify new products for women has been limited in the pharmaceutical industry relative to investment in drug development for other indications. Pharmaceutical R&D for male contraception was active in the 1990’s but was abandoned over a decade ago. The Eunice Kennedy Shriver National Institute of Child Health and Human Development (NICHD) has supported a contraceptive development program since 1969. Through a variety of programs including research grants and contracts, NICHD has developed a pipeline of new targets/products for male and female contraception. A number of lead candidates are under evaluation in the NICHD Contraceptive Clinical Trials Network (CCTN) (1–3). PMID:27523300

  8. Ecological effects of contaminants in McCoy Branch, 1989-1990

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ryon, M.G.

    1992-01-01

    The 1984 Hazardous and Solid Waste Amendments to the Resource Conservation and Recovery Act (RCRA) required assessment of all current and former solid waste management units. Such a RCRA Facility Investigation (RFI) was required of the Y-12 Plant for their Filled Coal Ash Pond on McCoy Branch. Because the disposal of coal ash in the ash pond, McCoy Branch, and Rogers Quarry was not consistent with the Tennessee Water Quality Act, several remediation steps were implemented or planned for McCoy Branch to address disposal problems. The McCoy Branch RFI plan included provisions for biological monitoring of the McCoy Branch watershed.more » The objectives of the biological monitoring were to: (1) document changes in biological quality of McCoy Branch after completion of a pipeline and after termination of all discharges to Rogers Quarry, (2) provide guidance on the need for additional remediation, and (3) evaluate the effectiveness of implemented remedial actions. The data from the biological monitoring program will also determine if the classified uses, as identified by the State of Tennessee, of McCoy Branch are being protected and maintained. This report discusses results from toxicity monitoring of snails fish community assessment, and a Benthic macroinvertebrate community assessment.« less

  9. Mathematical simulation for compensation capacities area of pipeline routes in ship systems

    NASA Astrophysics Data System (ADS)

    Ngo, G. V.; Sakhno, K. N.

    2018-05-01

    In this paper, the authors considered the problem of manufacturability’s enhancement of ship systems pipeline at the designing stage. The analysis of arrangements and possibilities for compensation of deviations for pipeline routes has been carried out. The task was set to produce the “fit pipe” together with the rest of the pipes in the route. It was proposed to compensate for deviations by movement of the pipeline route during pipe installation and to calculate maximum values of these displacements in the analyzed path. Theoretical bases of deviation compensation for pipeline routes using rotations of parallel section pairs of pipes are assembled. Mathematical and graphical simulations of compensation area capacities of pipeline routes with various configurations are completed. Prerequisites have been created for creating an automated program that will allow one to determine values of the compensatory capacities area for pipeline routes and to assign quantities of necessary allowances.

  10. Influence of Anchoring on Burial Depth of Submarine Pipelines

    PubMed Central

    Zhuang, Yuan; Li, Yang; Su, Wei

    2016-01-01

    Since the beginning of the twenty-first century, there has been widespread construction of submarine oil-gas transmission pipelines due to an increase in offshore oil exploration. Vessel anchoring operations are causing more damage to submarine pipelines due to shipping transportation also increasing. Therefore, it is essential that the influence of anchoring on the required burial depth of submarine pipelines is determined. In this paper, mathematical models for ordinary anchoring and emergency anchoring have been established to derive an anchor impact energy equation for each condition. The required effective burial depth for submarine pipelines has then been calculated via an energy absorption equation for the protection layer covering the submarine pipelines. Finally, the results of the model calculation have been verified by accident case analysis, and the impact of the anchoring height, anchoring water depth and the anchor weight on the required burial depth of submarine pipelines has been further analyzed. PMID:27166952

  11. An Aperture Photometry Pipeline for K2 Data

    NASA Astrophysics Data System (ADS)

    Buzasi, Derek L.; Carboneau, Lindsey; Lezcano, Andy; Vydra, Ekaterina

    2016-01-01

    As part of an ongoing research program with undergraduate students at Florida Gulf Coast University, we have constructed an aperture photometry pipeline for K2 data. The pipeline performs dynamic automated aperture mask definition for all targets in the K2 fields, followed by aperture photometry and detrending. Our pipeline is currently used to support a number of projects, including studies of stellar rotation and activity, red giant asteroseismology, gyrochronology, and exoplanet searches. In addition, output is used to support an undergraduate class on exoplanets aimed at a student audience of both majors and non-majors. The pipeline is designed for both batch and single-target use, and is easily extensible to data from other missions, and pipeline output is available to the community. This paper will describe our pipeline and its capabilities and illustrate the quality of the results, drawing on all of the applications for which it is currently used.

  12. Pipelining in a changing competitive environment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jones, E.G.; Wishart, D.M.

    1996-12-31

    The changing competitive environment for the pipeline industry presents a broad spectrum of new challenges and opportunities: international cooperation; globalization of opportunities, organizations and competition; and integrated systems approach to system configuration, financing, contracting strategy, materials sourcing, and operations; cutting edge and emerging technologies; adherence to high standards of environmental protection; an emphasis on safety; innovative approaches to project financing; and advances in technology and programs to maintain the long term, cost effective integrity of operating pipeline systems. These challenges and opportunities are partially a result of the increasingly competitive nature of pipeline development and the public`s intolerance to incidentsmore » of pipeline failure. A creative systems approach to these challenges is often the key to the project moving ahead. This usually encompasses collaboration among users of the pipeline, pipeline owners and operators, international engineering and construction companies, equipment and materials suppliers, in-country engineers and constructors, international lending agencies and financial institutions.« less

  13. Multinode reconfigurable pipeline computer

    NASA Technical Reports Server (NTRS)

    Nosenchuck, Daniel M. (Inventor); Littman, Michael G. (Inventor)

    1989-01-01

    A multinode parallel-processing computer is made up of a plurality of innerconnected, large capacity nodes each including a reconfigurable pipeline of functional units such as Integer Arithmetic Logic Processors, Floating Point Arithmetic Processors, Special Purpose Processors, etc. The reconfigurable pipeline of each node is connected to a multiplane memory by a Memory-ALU switch NETwork (MASNET). The reconfigurable pipeline includes three (3) basic substructures formed from functional units which have been found to be sufficient to perform the bulk of all calculations. The MASNET controls the flow of signals from the memory planes to the reconfigurable pipeline and vice versa. the nodes are connectable together by an internode data router (hyperspace router) so as to form a hypercube configuration. The capability of the nodes to conditionally configure the pipeline at each tick of the clock, without requiring a pipeline flush, permits many powerful algorithms to be implemented directly.

  14. Leak detectability of the Norman Wells pipeline by mass balance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Liou, J.C.P.

    Pipeline leak detection using software-based systems is becoming common practice. The detectability of such systems is measured by how small and how quickly a leak can be detected. Algorithms used and measurement uncertainties determine leak detectability. This paper addresses leak detectability using mass balance, establishes leak detectability for Norman Wells pipelines, and compares it with field leak test results. The pipeline is operated by the Interprovincial Pipe Line (IPL) Inc., of Edmonton, Canada. It is a 12.75-inch outside diameter steel pipe with variable wall thickness. The length of the pipe is approximately 550 miles (868.9 km). The pipeline transports lightmore » crude oil at a constant flow rate of about 250 m{sup 3}/hr. The crude oil can enter the pipeline at two locations. Besides the Norman Wells inlet, there is a side line near Zama terminal that can inject crude oil into the pipeline.« less

  15. 76 FR 54531 - Pipeline Safety: Potential for Damage to Pipeline Facilities Caused by the Passage of Hurricanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-01

    ... production and processing is prone to disruption by hurricanes. In 2005, Hurricanes Katrina and Rita caused... Hurricanes AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: Notice... the passage of Hurricanes. ADDRESSES: This document can be viewed on the Office of Pipeline Safety...

  16. 40 CFR 63.11089 - What requirements must I meet for equipment leak inspections if my facility is a bulk gasoline...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Source Category: Gasoline Distribution Bulk Terminals, Bulk Plants, and Pipeline Facilities Emission... equipment leak inspections if my facility is a bulk gasoline terminal, bulk plant, pipeline breakout station... if my facility is a bulk gasoline terminal, bulk plant, pipeline breakout station, or pipeline...

  17. Development of a robotic system of nonstripping pipeline repair by reinforced polymeric compositions

    NASA Astrophysics Data System (ADS)

    Rybalkin, LA

    2018-03-01

    The article considers the possibility of creating a robotic system for pipeline repair. The pipeline repair is performed due to inner layer formation by special polyurethane compositions reinforced by short glass fiber strands. This approach provides the opportunity to repair pipelines without excavation works and pipe replacement.

  18. 49 CFR 192.487 - Remedial measures: Distribution lines other than cast iron or ductile iron lines.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY... required for the MAOP of the pipeline, or a remaining wall thickness less than 30 percent of the nominal...

  19. 78 FR 75557 - CE FLNG, LLC, CE Pipeline, LLC; Notice of Intent To Prepare an Environmental Impact Statement for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-12

    ... acquisition of an easement to construct, operate, and maintain the natural gas transmission pipeline...-diameter natural gas transmission pipeline in Plaquemines Parish, Louisiana. The LNG terminal would be... port. The planned transmission pipeline would connect the terminal to existing natural gas...

  20. 77 FR 66568 - Revisions to Procedural Regulations Governing Transportation by Intrastate Pipelines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-06

    ... filings by those natural gas pipelines that fall under the Commission's jurisdiction pursuant to the Natural Gas Policy Act of 1978 or the Natural Gas Act. An intrastate pipeline may elect to use these... Pipelines C. Withdrawal Procedures 20 III. Information Collection Statement 21 IV. Environmental Analysis 28...

  1. 78 FR 15715 - Excelerate Liquefaction Solutions I, LLC; Lavaca Bay Pipeline System, LLC; Notice of Intent To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-12

    ... natural gas from existing pipeline systems to the LNG terminal facilities. The Project would be... room, warehouse, and shop. Pipeline Header System: A 29-mile-long, 42-inch-diameter natural gas pipeline extending northward from the shoreside facilities to nine natural gas interconnects southwest of...

  2. 75 FR 17397 - Hydrogen Energy California's Integrated Gasification Combined Cycle Project, Kern County, CA...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-06

    ... and potable water pipelines, a transmission line, a natural gas supply pipeline, a CO 2 pipeline... line. HECA would also construct an approximately 8-mile natural gas supply pipeline extending southeast... produce synthesis gas (syngas), which would then be processed and purified to produce a hydrogen-rich fuel...

  3. 75 FR 19957 - B-R Pipeline Company; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP10-129-000] B-R Pipeline Company; Notice of Application April 9, 2010. Take notice that on April 8, 2010, B-R Pipeline Company (B-R... should be directed to Counsel for B-R Pipeline Company, William H. Penniman or Michael Brooks, Sutherland...

  4. Expansion of the U.S. Natural Gas Pipeline Network

    EIA Publications

    2009-01-01

    Additions in 2008 and Projects through 2011. This report examines new natural gas pipeline capacity added to the U.S. natural gas pipeline system during 2008. In addition, it discusses and analyzes proposed natural gas pipeline projects that may be developed between 2009 and 2011, and the market factors supporting these initiatives.

  5. 49 CFR 195.11 - What is a regulated rural gathering line and what requirements apply?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... subpart H of this part, except corrosion control is not required for pipelines existing on July 3, 2008... (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE General § 195.11 What is a regulated rural...

  6. 49 CFR 195.11 - What is a regulated rural gathering line and what requirements apply?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... subpart H of this part, except corrosion control is not required for pipelines existing on July 3, 2008... (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE General § 195.11 What is a regulated rural...

  7. 78 FR 39720 - Atmos Pipeline and Storage, LLC; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-02

    ... and Storage, LLC; Notice of Application Take notice that on June 14, 2013, Atmos Pipeline and Storage... authorizing the construction and operation of the Fort Necessity Gas Storage Project (Project) and associated...) \\2\\. \\1\\ Atmos Pipeline and Storage, LLC, 127 FERC ] 61,260 (2009). \\2\\ Atmos Pipeline and Storage...

  8. 30 CFR 57.12081 - Bonding metal pipelines to ground return circuits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Bonding metal pipelines to ground return... NONMETAL MINES Electricity Underground Only § 57.12081 Bonding metal pipelines to ground return circuits... a ground return circuit shall be bonded to the return circuit rail at the ends of the pipeline and...

  9. 30 CFR 57.12081 - Bonding metal pipelines to ground return circuits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Bonding metal pipelines to ground return... NONMETAL MINES Electricity Underground Only § 57.12081 Bonding metal pipelines to ground return circuits... a ground return circuit shall be bonded to the return circuit rail at the ends of the pipeline and...

  10. 76 FR 33748 - Combined Notice of Filings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-09

    .... Applicants: ETC Tiger Pipeline, LLC. Description: ETC Tiger Pipeline, LLC submits tariff filing per 154.403(d)(2): ETC Tiger 2011--05--26 Out of Cycle Fuel Filing to be effective 7/1/2011. Filed Date: 05/26/2011... Numbers: RP11-2138-000. Applicants: ETC Tiger Pipeline, LLC. Description: ETC Tiger Pipeline, LLC submits...

  11. 49 CFR Appendix B to Part 195 - Risk-Based Alternative to Pressure Testing Older Hazardous Liquid and Carbon Dioxide Pipelines

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) (Propane, butane, Natural Gas Liquid (NGL), ammonia) Highly toxic (Benzene, high Hydrogen Sulfide content... Hazardous Liquid and Carbon Dioxide Pipelines B Appendix B to Part 195 Transportation Other Regulations... OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Pt. 195...

  12. 49 CFR Appendix B to Part 195 - Risk-Based Alternative to Pressure Testing Older Hazardous Liquid and Carbon Dioxide Pipelines

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) (Propane, butane, Natural Gas Liquid (NGL), ammonia) Highly toxic (Benzene, high Hydrogen Sulfide content... Hazardous Liquid and Carbon Dioxide Pipelines B Appendix B to Part 195 Transportation Other Regulations... OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Pt. 195...

  13. 49 CFR Appendix B to Part 195 - Risk-Based Alternative to Pressure Testing Older Hazardous Liquid and Carbon Dioxide Pipelines

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) (Propane, butane, Natural Gas Liquid (NGL), ammonia) Highly toxic (Benzene, high Hydrogen Sulfide content... Hazardous Liquid and Carbon Dioxide Pipelines B Appendix B to Part 195 Transportation Other Regulations... OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Pt. 195...

  14. 49 CFR Appendix B to Part 195 - Risk-Based Alternative to Pressure Testing Older Hazardous Liquid and Carbon Dioxide Pipelines

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) (Propane, butane, Natural Gas Liquid (NGL), ammonia) Highly toxic (Benzene, high Hydrogen Sulfide content... Hazardous Liquid and Carbon Dioxide Pipelines B Appendix B to Part 195 Transportation Other Regulations... OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Pt. 195...

  15. 49 CFR Appendix B to Part 195 - Risk-Based Alternative to Pressure Testing Older Hazardous Liquid and Carbon Dioxide Pipelines

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) (Propane, butane, Natural Gas Liquid (NGL), ammonia) Highly toxic (Benzene, high Hydrogen Sulfide content... Hazardous Liquid and Carbon Dioxide Pipelines B Appendix B to Part 195 Transportation Other Regulations... OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Pt. 195...

  16. 76 FR 12949 - Stingray Pipeline Company, L.L.C.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP11-97-000] Stingray Pipeline Company, L.L.C.; Notice of Application On February 22, 2011, Stingray Pipeline Company, L.L.C...--Regulatory Affairs, Stingray Pipeline Company, L.L.C., 1100 Louisiana, Suite 3300, Houston, Texas 77002, by...

  17. 77 FR 23472 - Tennessee Gas Pipeline Company, L.L.C.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-19

    ... Pipeline Company, L.L.C.; Notice of Application Take notice that on April 4, 2012, Tennessee Gas Pipeline Company, L.L.C. (Tennessee), 1001 Louisiana Street, Houston, Texas 77002, filed an application in the..., Manager, Certificates, Tennessee Gas Pipeline Company, L.L.C., 1001 Louisiana Street, Houston, Texas 77002...

  18. 78 FR 6313 - Tennessee Gas Pipeline Company, L.L.C.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-30

    ... Pipeline Company, L.L.C.; Notice of Application Take notice that on January 14, 2013, Tennessee Gas Pipeline Company, L.L.C. (Tennessee), 1001 Louisiana Street, Houston, Texas 77002, filed an application in... directed to Thomas G. Joyce, Manager, Certificates, Tennessee Gas Pipeline Company, L.L.C. 1001 Louisiana...

  19. 49 CFR 192.1015 - What must a master meter or small liquefied petroleum gas (LPG) operator do to implement this...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Gas Distribution Pipeline Integrity Management (IM) § 192.1015 What must...

  20. 75 FR 51031 - Natural Gas Pipeline Company of America LLC; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-18

    ... Pipeline Company of America LLC; Notice of Application August 12, 2010. Take notice that on July 30, 2010, Natural Gas Pipeline Company of America LLC (Natural Gas), 3250 Lacey Road, Suite 700, Downers Grove..., Regulatory Products and Services, Natural Gas Pipeline Company of America LLC, 3250 Lacey Road, Suite 700...

  1. 33 CFR 88.15 - Lights on dredge pipelines.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Lights on dredge pipelines. 88.15... NAVIGATION RULES ANNEX V: PILOT RULES § 88.15 Lights on dredge pipelines. Dredge pipelines that are floating or supported on trestles shall display the following lights at night and in periods of restricted...

  2. 33 CFR 88.15 - Lights on dredge pipelines.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 1 2013-07-01 2013-07-01 false Lights on dredge pipelines. 88.15... NAVIGATION RULES ANNEX V: PILOT RULES § 88.15 Lights on dredge pipelines. Dredge pipelines that are floating or supported on trestles shall display the following lights at night and in periods of restricted...

  3. 33 CFR 88.15 - Lights on dredge pipelines.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 1 2014-07-01 2014-07-01 false Lights on dredge pipelines. 88.15... NAVIGATION RULES ANNEX V: PILOT RULES § 88.15 Lights on dredge pipelines. Dredge pipelines that are floating or supported on trestles shall display the following lights at night and in periods of restricted...

  4. 33 CFR 88.15 - Lights on dredge pipelines.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Lights on dredge pipelines. 88.15... NAVIGATION RULES ANNEX V: PILOT RULES § 88.15 Lights on dredge pipelines. Dredge pipelines that are floating or supported on trestles shall display the following lights at night and in periods of restricted...

  5. 33 CFR 88.15 - Lights on dredge pipelines.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 1 2012-07-01 2012-07-01 false Lights on dredge pipelines. 88.15... NAVIGATION RULES ANNEX V: PILOT RULES § 88.15 Lights on dredge pipelines. Dredge pipelines that are floating or supported on trestles shall display the following lights at night and in periods of restricted...

  6. Study of stress-strain state of pipeline under permafrost conditions

    NASA Astrophysics Data System (ADS)

    Tarasenko, A. A.; Redutinskiy, M. N.; Chepur, P. V.; Gruchenkova, A. A.

    2018-05-01

    In this paper, the dependences of the stress-strain state and subsidence of pipelines on the dimensions of the subsidence zone are obtained for the sizes of pipes that have become most widespread during the construction of main oil pipelines (530x10, 820x12, 1020x12, 1020x14, 1020x16, 1220x14, 1220x16, 1220x18 mm). True values of stresses in the pipeline wall, as well as the exact location of maximum stresses for the interval of subsidence zones from 5 to 60 meters, are determined. For this purpose, the authors developed a finite element model of the pipeline that takes into account the actual interaction of the pipeline with the subgrade and allows calculating the SSS of the structure for a variable subsidence zone. Based on the obtained dependences for the underground laying of oil pipelines in permafrost areas, it is proposed to artificially limit the zone of possible subsidence by separation supports from the soil with higher building properties and physical-mechanical parameters. This technical solution would significantly reduce costs when constructing new oil pipelines in permafrost areas.

  7. BigDataScript: a scripting language for data pipelines.

    PubMed

    Cingolani, Pablo; Sladek, Rob; Blanchette, Mathieu

    2015-01-01

    The analysis of large biological datasets often requires complex processing pipelines that run for a long time on large computational infrastructures. We designed and implemented a simple script-like programming language with a clean and minimalist syntax to develop and manage pipeline execution and provide robustness to various types of software and hardware failures as well as portability. We introduce the BigDataScript (BDS) programming language for data processing pipelines, which improves abstraction from hardware resources and assists with robustness. Hardware abstraction allows BDS pipelines to run without modification on a wide range of computer architectures, from a small laptop to multi-core servers, server farms, clusters and clouds. BDS achieves robustness by incorporating the concepts of absolute serialization and lazy processing, thus allowing pipelines to recover from errors. By abstracting pipeline concepts at programming language level, BDS simplifies implementation, execution and management of complex bioinformatics pipelines, resulting in reduced development and debugging cycles as well as cleaner code. BigDataScript is available under open-source license at http://pcingola.github.io/BigDataScript. © The Author 2014. Published by Oxford University Press.

  8. External corrosion and leakage detection of oil and gas pipeline using FBG fiber optics and a trigger

    NASA Astrophysics Data System (ADS)

    Ge, Yaomou

    Oil and gas pipelines play a critical role in delivering the energy resources from producing fields to power communities around the world. However, there are many threats to pipeline integrity, which may lead to significant incidents, causing safety, environmental and economic problems. Corrosion has been a big threat to oil and gas pipelines for a long time, which has attributed to approximately 18% of the significant incidents in oil and gas pipelines. In addition, external corrosion of pipelines accounts for a significant portion (more than 25%) of pipeline failure. External corrosion detection is the research area of this thesis. In this thesis, a review of existing corrosion detection or monitoring methods is presented, and optical fiber sensors show a great promise in corrosion detection of oil and gas pipelines. Several scenarios of optical fiber corrosion sensors are discussed, and two of them are selected for future research. A new corrosion and leakage detection sensor, consisting of a custom designed trigger and a FBG optical fiber, will be presented. This new device has been experimentally tested and it shows great promise.

  9. Urban Underground Pipelines Mapping Using Ground Penetrating Radar

    NASA Astrophysics Data System (ADS)

    Jaw, S. W.; M, Hashim

    2014-02-01

    Underground spaces are now being given attention to exploit for transportation, utilities, and public usage. The underground has become a spider's web of utility networks. Mapping of underground utility pipelines has become a challenging and difficult task. As such, mapping of underground utility pipelines is a "hit-and-miss" affair, and results in many catastrophic damages, particularly in urban areas. Therefore, this study was conducted to extract locational information of the urban underground utility pipeline using trenchless measuring tool, namely ground penetrating radar (GPR). The focus of this study was to conduct underground utility pipeline mapping for retrieval of geometry properties of the pipelines, using GPR. In doing this, a series of tests were first conducted at the preferred test site and real-life experiment, followed by modeling of field-based model using Finite-Difference Time-Domain (FDTD). Results provide the locational information of underground utility pipelines associated with its mapping accuracy. Eventually, this locational information of the underground utility pipelines is beneficial to civil infrastructure management and maintenance which in the long term is time-saving and critically important for the development of metropolitan areas.

  10. BigDataScript: a scripting language for data pipelines

    PubMed Central

    Cingolani, Pablo; Sladek, Rob; Blanchette, Mathieu

    2015-01-01

    Motivation: The analysis of large biological datasets often requires complex processing pipelines that run for a long time on large computational infrastructures. We designed and implemented a simple script-like programming language with a clean and minimalist syntax to develop and manage pipeline execution and provide robustness to various types of software and hardware failures as well as portability. Results: We introduce the BigDataScript (BDS) programming language for data processing pipelines, which improves abstraction from hardware resources and assists with robustness. Hardware abstraction allows BDS pipelines to run without modification on a wide range of computer architectures, from a small laptop to multi-core servers, server farms, clusters and clouds. BDS achieves robustness by incorporating the concepts of absolute serialization and lazy processing, thus allowing pipelines to recover from errors. By abstracting pipeline concepts at programming language level, BDS simplifies implementation, execution and management of complex bioinformatics pipelines, resulting in reduced development and debugging cycles as well as cleaner code. Availability and implementation: BigDataScript is available under open-source license at http://pcingola.github.io/BigDataScript. Contact: pablo.e.cingolani@gmail.com PMID:25189778

  11. Reasons for decision in the matter of Maritimes and Northeast Pipeline Management Ltd. application dated 24 February 1998 for approval of the plan, profile and book of reference respecting the detailed pipeline route from Goldboro, N.S. to St. Stephen, N.B.: MH-3-98

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-12-31

    In December 1997, Maritimes and Northeast Pipeline Management Ltd. received approval to construct and operate a natural gas pipeline consisting of about 558 kilometers of 762-millimeter pipe to be located within a one-kilometer-wide corridor extending from Goldboro, Nova Scotia to the international border near St. Stephen, New Brunswick. This report covers the second stage of the pipeline approval process where the detailed route is determined. It presents the views of the pipeline company, various landowners and mineral rights holders objecting to the proposed detailed route, and the National Energy Board with regard to two issues: The best possible detailed routemore » for the pipeline, and the most appropriate methods and timing of constructing the pipeline. Specific land/mineral rights owner cases including the nature of the objection, possible alternate routes, and the Board decision in each case are described.« less

  12. Stability of subsea pipelines during large storms

    PubMed Central

    Draper, Scott; An, Hongwei; Cheng, Liang; White, David J.; Griffiths, Terry

    2015-01-01

    On-bottom stability design of subsea pipelines transporting hydrocarbons is important to ensure safety and reliability but is challenging to achieve in the onerous metocean (meteorological and oceanographic) conditions typical of large storms (such as tropical cyclones, hurricanes or typhoons). This challenge is increased by the fact that industry design guidelines presently give no guidance on how to incorporate the potential benefits of seabed mobility, which can lead to lowering and self-burial of the pipeline on a sandy seabed. In this paper, we demonstrate recent advances in experimental modelling of pipeline scour and present results investigating how pipeline stability can change in a large storm. An emphasis is placed on the initial development of the storm, where scour is inevitable on an erodible bed as the storm velocities build up to peak conditions. During this initial development, we compare the rate at which peak near-bed velocities increase in a large storm (typically less than 10−3 m s−2) to the rate at which a pipeline scours and subsequently lowers (which is dependent not only on the storm velocities, but also on the mechanism of lowering and the pipeline properties). We show that the relative magnitude of these rates influences pipeline embedment during a storm and the stability of the pipeline. PMID:25512592

  13. Discrete pre-processing step effects in registration-based pipelines, a preliminary volumetric study on T1-weighted images

    PubMed Central

    2017-01-01

    Pre-processing MRI scans prior to performing volumetric analyses is common practice in MRI studies. As pre-processing steps adjust the voxel intensities, the space in which the scan exists, and the amount of data in the scan, it is possible that the steps have an effect on the volumetric output. To date, studies have compared between and not within pipelines, and so the impact of each step is unknown. This study aims to quantify the effects of pre-processing steps on volumetric measures in T1-weighted scans within a single pipeline. It was our hypothesis that pre-processing steps would significantly impact ROI volume estimations. One hundred fifteen participants from the OASIS dataset were used, where each participant contributed three scans. All scans were then pre-processed using a step-wise pipeline. Bilateral hippocampus, putamen, and middle temporal gyrus volume estimations were assessed following each successive step, and all data were processed by the same pipeline 5 times. Repeated-measures analyses tested for a main effects of pipeline step, scan-rescan (for MRI scanner consistency) and repeated pipeline runs (for algorithmic consistency). A main effect of pipeline step was detected, and interestingly an interaction between pipeline step and ROI exists. No effect for either scan-rescan or repeated pipeline run was detected. We then supply a correction for noise in the data resulting from pre-processing. PMID:29023597

  14. Bio-Docklets: virtualization containers for single-step execution of NGS pipelines.

    PubMed

    Kim, Baekdoo; Ali, Thahmina; Lijeron, Carlos; Afgan, Enis; Krampis, Konstantinos

    2017-08-01

    Processing of next-generation sequencing (NGS) data requires significant technical skills, involving installation, configuration, and execution of bioinformatics data pipelines, in addition to specialized postanalysis visualization and data mining software. In order to address some of these challenges, developers have leveraged virtualization containers toward seamless deployment of preconfigured bioinformatics software and pipelines on any computational platform. We present an approach for abstracting the complex data operations of multistep, bioinformatics pipelines for NGS data analysis. As examples, we have deployed 2 pipelines for RNA sequencing and chromatin immunoprecipitation sequencing, preconfigured within Docker virtualization containers we call Bio-Docklets. Each Bio-Docklet exposes a single data input and output endpoint and from a user perspective, running the pipelines as simply as running a single bioinformatics tool. This is achieved using a "meta-script" that automatically starts the Bio-Docklets and controls the pipeline execution through the BioBlend software library and the Galaxy Application Programming Interface. The pipeline output is postprocessed by integration with the Visual Omics Explorer framework, providing interactive data visualizations that users can access through a web browser. Our goal is to enable easy access to NGS data analysis pipelines for nonbioinformatics experts on any computing environment, whether a laboratory workstation, university computer cluster, or a cloud service provider. Beyond end users, the Bio-Docklets also enables developers to programmatically deploy and run a large number of pipeline instances for concurrent analysis of multiple datasets. © The Authors 2017. Published by Oxford University Press.

  15. Pipeline corridors through wetlands -- Impacts on plant communities: Little Timber Creek Crossing, Gloucester County, New Jersey. Topical report, August 1991--January 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shem, L.M.; Zimmerman, R.E.; Alsum, S.K.

    1994-12-01

    The goal of the Gas Research Institute Wetland Corridors Program is to document impacts of existing pipelines on the wetlands they traverse. To accomplish this goal, 12 existing wetland crossings were surveyed. These sites varied in elapsed time since pipeline construction, wetland type, pipeline installation techniques, and right-of-way (ROW) management practices. This report presents results of a survey conducted over the period of August 5--7, 1991, at the Little Timber Creek crossing in Gloucester County, New Jersey, where three pipelines, constructed in 1950, 1960, and 1990, cross the creek and associated wetlands. The old side of the ROW, created bymore » the installation of the 1960 pipeline, was designed to contain a raised peat bed over the 1950 pipeline and an open-water ditch over the 1960 pipeline. The new portion of the ROW, created by installation of the 1990 pipeline, has an open-water ditch over the pipeline (resulting from settling of the backfill) and a raised peat bed (resulting from rebound of compacted peat). Both the old and new ROWs contain dense stands of herbs; the vegetation on the old ROW was more similar to that in the adjacent natural area than was vegetation in the new ROW. The ROW increased species and habitat diversity in the wetlands. It may contribute to the spread of purple loosestrife and affect species sensitive to habitat fragmentation.« less

  16. Bio-Docklets: virtualization containers for single-step execution of NGS pipelines

    PubMed Central

    Kim, Baekdoo; Ali, Thahmina; Lijeron, Carlos; Afgan, Enis

    2017-01-01

    Abstract Processing of next-generation sequencing (NGS) data requires significant technical skills, involving installation, configuration, and execution of bioinformatics data pipelines, in addition to specialized postanalysis visualization and data mining software. In order to address some of these challenges, developers have leveraged virtualization containers toward seamless deployment of preconfigured bioinformatics software and pipelines on any computational platform. We present an approach for abstracting the complex data operations of multistep, bioinformatics pipelines for NGS data analysis. As examples, we have deployed 2 pipelines for RNA sequencing and chromatin immunoprecipitation sequencing, preconfigured within Docker virtualization containers we call Bio-Docklets. Each Bio-Docklet exposes a single data input and output endpoint and from a user perspective, running the pipelines as simply as running a single bioinformatics tool. This is achieved using a “meta-script” that automatically starts the Bio-Docklets and controls the pipeline execution through the BioBlend software library and the Galaxy Application Programming Interface. The pipeline output is postprocessed by integration with the Visual Omics Explorer framework, providing interactive data visualizations that users can access through a web browser. Our goal is to enable easy access to NGS data analysis pipelines for nonbioinformatics experts on any computing environment, whether a laboratory workstation, university computer cluster, or a cloud service provider. Beyond end users, the Bio-Docklets also enables developers to programmatically deploy and run a large number of pipeline instances for concurrent analysis of multiple datasets. PMID:28854616

  17. Gathering pipeline methane emissions in Fayetteville shale pipelines and scoping guidelines for future pipeline measurement campaigns

    DOE PAGES

    Zimmerle, Daniel J.; Pickering, Cody K.; Bell, Clay S.; ...

    2017-11-24

    Gathering pipelines, which transport gas from well pads to downstream processing, are a sector of the natural gas supply chain for which little measured methane emissions data are available. This study performed leak detection and measurement on 96 km of gathering pipeline and the associated 56 pigging facilities and 39 block valves. The study found one underground leak accounting for 83% (4.0 kg CH 4/hr) of total measured emissions. Methane emissions for the 4684 km of gathering pipeline in the study area were estimated at 402 kg CH 4/hr [95 to 1065 kg CH 4/hr, 95% CI], or 1% [0.2%more » to 2.6%] of all methane emissions measured during a prior aircraft study of the same area. Emissions estimated by this study fall within the uncertainty range of emissions estimated using emission factors from EPA's 2015 Greenhouse Inventory and study activity estimates. While EPA's current inventory is based upon emission factors from distribution mains measured in the 1990s, this study indicates that using emission factors from more recent distribution studies could significantly underestimate emissions from gathering pipelines. To guide broader studies of pipeline emissions, we also estimate the fraction of the pipeline length within a basin that must be measured to constrain uncertainty of pipeline emissions estimates to within 1% of total basin emissions. The study provides both substantial insight into the mix of emission sources and guidance for future gathering pipeline studies, but since measurements were made in a single basin, the results are not sufficiently representative to provide methane emission factors at the regional or national level.« less

  18. Gathering pipeline methane emissions in Fayetteville shale pipelines and scoping guidelines for future pipeline measurement campaigns

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zimmerle, Daniel J.; Pickering, Cody K.; Bell, Clay S.

    Gathering pipelines, which transport gas from well pads to downstream processing, are a sector of the natural gas supply chain for which little measured methane emissions data are available. This study performed leak detection and measurement on 96 km of gathering pipeline and the associated 56 pigging facilities and 39 block valves. The study found one underground leak accounting for 83% (4.0 kg CH 4/hr) of total measured emissions. Methane emissions for the 4684 km of gathering pipeline in the study area were estimated at 402 kg CH 4/hr [95 to 1065 kg CH 4/hr, 95% CI], or 1% [0.2%more » to 2.6%] of all methane emissions measured during a prior aircraft study of the same area. Emissions estimated by this study fall within the uncertainty range of emissions estimated using emission factors from EPA's 2015 Greenhouse Inventory and study activity estimates. While EPA's current inventory is based upon emission factors from distribution mains measured in the 1990s, this study indicates that using emission factors from more recent distribution studies could significantly underestimate emissions from gathering pipelines. To guide broader studies of pipeline emissions, we also estimate the fraction of the pipeline length within a basin that must be measured to constrain uncertainty of pipeline emissions estimates to within 1% of total basin emissions. The study provides both substantial insight into the mix of emission sources and guidance for future gathering pipeline studies, but since measurements were made in a single basin, the results are not sufficiently representative to provide methane emission factors at the regional or national level.« less

  19. Data as a Service: A Seismic Web Service Pipeline

    NASA Astrophysics Data System (ADS)

    Martinez, E.

    2016-12-01

    Publishing data as a service pipeline provides an improved, dynamic approach over static data archives. A service pipeline is a collection of micro web services that each perform a specific task and expose the results of that task. Structured request/response formats allow micro web services to be chained together into a service pipeline to provide more complex results. The U.S. Geological Survey adopted service pipelines to publish seismic hazard and design data supporting both specific and generalized audiences. The seismic web service pipeline starts at source data and exposes probability and deterministic hazard curves, response spectra, risk-targeted ground motions, and seismic design provision metadata. This pipeline supports public/private organizations and individual engineers/researchers. Publishing data as a service pipeline provides a variety of benefits. Exposing the component services enables advanced users to inspect or use the data at each processing step. Exposing a composite service enables new users quick access to published data with a very low barrier to entry. Advanced users may re-use micro web services by chaining them in new ways or injecting new micros services into the pipeline. This allows the user to test hypothesis and compare their results to published results. Exposing data at each step in the pipeline enables users to review and validate the data and process more quickly and accurately. Making the source code open source, per USGS policy, further enables this transparency. Each micro service may be scaled independent of any other micro service. This ensures data remains available and timely in a cost-effective manner regardless of load. Additionally, if a new or more efficient approach to processing the data is discovered, this new approach may replace the old approach at any time, keeping the pipeline running while not affecting other micro services.

  20. A Java-based fMRI processing pipeline evaluation system for assessment of univariate general linear model and multivariate canonical variate analysis-based pipelines.

    PubMed

    Zhang, Jing; Liang, Lichen; Anderson, Jon R; Gatewood, Lael; Rottenberg, David A; Strother, Stephen C

    2008-01-01

    As functional magnetic resonance imaging (fMRI) becomes widely used, the demands for evaluation of fMRI processing pipelines and validation of fMRI analysis results is increasing rapidly. The current NPAIRS package, an IDL-based fMRI processing pipeline evaluation framework, lacks system interoperability and the ability to evaluate general linear model (GLM)-based pipelines using prediction metrics. Thus, it can not fully evaluate fMRI analytical software modules such as FSL.FEAT and NPAIRS.GLM. In order to overcome these limitations, a Java-based fMRI processing pipeline evaluation system was developed. It integrated YALE (a machine learning environment) into Fiswidgets (a fMRI software environment) to obtain system interoperability and applied an algorithm to measure GLM prediction accuracy. The results demonstrated that the system can evaluate fMRI processing pipelines with univariate GLM and multivariate canonical variates analysis (CVA)-based models on real fMRI data based on prediction accuracy (classification accuracy) and statistical parametric image (SPI) reproducibility. In addition, a preliminary study was performed where four fMRI processing pipelines with GLM and CVA modules such as FSL.FEAT and NPAIRS.CVA were evaluated with the system. The results indicated that (1) the system can compare different fMRI processing pipelines with heterogeneous models (NPAIRS.GLM, NPAIRS.CVA and FSL.FEAT) and rank their performance by automatic performance scoring, and (2) the rank of pipeline performance is highly dependent on the preprocessing operations. These results suggest that the system will be of value for the comparison, validation, standardization and optimization of functional neuroimaging software packages and fMRI processing pipelines.

  1. Analysis of oil-pipeline distribution of multiple products subject to delivery time-windows

    NASA Astrophysics Data System (ADS)

    Jittamai, Phongchai

    This dissertation defines the operational problems of, and develops solution methodologies for, a distribution of multiple products into oil pipeline subject to delivery time-windows constraints. A multiple-product oil pipeline is a pipeline system composing of pipes, pumps, valves and storage facilities used to transport different types of liquids. Typically, products delivered by pipelines are petroleum of different grades moving either from production facilities to refineries or from refineries to distributors. Time-windows, which are generally used in logistics and scheduling areas, are incorporated in this study. The distribution of multiple products into oil pipeline subject to delivery time-windows is modeled as multicommodity network flow structure and mathematically formulated. The main focus of this dissertation is the investigation of operating issues and problem complexity of single-source pipeline problems and also providing solution methodology to compute input schedule that yields minimum total time violation from due delivery time-windows. The problem is proved to be NP-complete. The heuristic approach, a reversed-flow algorithm, is developed based on pipeline flow reversibility to compute input schedule for the pipeline problem. This algorithm is implemented in no longer than O(T·E) time. This dissertation also extends the study to examine some operating attributes and problem complexity of multiple-source pipelines. The multiple-source pipeline problem is also NP-complete. A heuristic algorithm modified from the one used in single-source pipeline problems is introduced. This algorithm can also be implemented in no longer than O(T·E) time. Computational results are presented for both methodologies on randomly generated problem sets. The computational experience indicates that reversed-flow algorithms provide good solutions in comparison with the optimal solutions. Only 25% of the problems tested were more than 30% greater than optimal values and approximately 40% of the tested problems were solved optimally by the algorithms.

  2. Assessing fugitive emissions of CH4 from high-pressure gas pipelines in the UK

    NASA Astrophysics Data System (ADS)

    Clancy, S.; Worrall, F.; Davies, R. J.; Almond, S.; Boothroyd, I.

    2016-12-01

    Concern over the greenhouse gas impact of the exploitation of unconventional natural gas from shale deposits has caused a spotlight to be shone on to the entire hydrocarbon industry. Numerous studies have developed life-cycle emissions inventories to assess the impact that hydraulic fracturing has upon greenhouse gas emissions. Incorporated within life-cycle assessments are transmission and distribution losses, including infrastructure such as pipelines and compressor stations that pressurise natural gas for transport along pipelines. Estimates of fugitive emissions from transmission, storage and distribution have been criticized for reliance on old data from inappropriate sources (1970s Russian gas pipelines). In this study, we investigate fugitive emissions of CH4 from the UK high pressure national transmission system. The study took two approaches. Firstly, CH4 concentration is detected by driving along roads bisecting high pressure gas pipelines and also along an equivalent distance along a route where no high pressure gas pipeline was nearby. Five pipelines and five equivalent control routes were driven and the test was that CH4 measurements, when adjusted for distance and wind speed, should be greater on any route with a pipe than any route without a pipe. Secondly, 5 km of a high pressure gas pipeline and 5 km of equivalent farmland, were walked and soil gas (above the pipeline where present) was analysed every 7 m using a tunable diode laser. When wind adjusted 92 km of high pressure pipeline and 72 km of control route were drive over a 10 day period. When wind and distance adjusted CH4 fluxes were significantly greater on routes with a pipeline than those without. The smallest leak detectable was 3% above ambient (1.03 relative concentration) with any leaks below 3% above ambient assumed ambient. The number of leaks detected along the pipelines correlate to the estimated length of pipe joints, inferring that there are constant fugitive CH4 emissions from these joints. When scaled up to the UK's National Transmission System pipeline length of 7600 km gives a fugitive CH4 flux of 62.6 kt CH4/yr with a CO2 equivalent of 1570 kt CO2eq/yr - this fugitive emission from high pressure pipelines is 0.14% of the annual gas supply.

  3. 49 CFR 192.51 - Scope.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE... for the selection and qualification of pipe and components for use in pipelines. ...

  4. 78 FR 44558 - Stingray Pipeline Company, L.L.C.; Notice of Request Under Blanket Authorization

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-24

    ... Pipeline Company, L.L.C.; Notice of Request Under Blanket Authorization Take notice that on July 3, 2013, Stingray Pipeline Company, L.L.C. (Stingray), 1100 Louisiana Street, Houston, Texas 77002, filed in Docket... Compliance, Stingray Pipeline Company, L.L.C., 1100 Louisiana, Suite 3300, Houston, Texas 77002, or call (832...

  5. Regulatory assessment with regulatory flexibility analysis and paperwork reduction act analysis : draft regulatory evaluation : Notice of Proposed Rulemaking -- Pipeline Safety : Polyamide-11 (PA-11) plastic pipe design pressures

    DOT National Transportation Integrated Search

    2007-06-01

    The Pipeline and Hazardous Materials Safety Administration (PHMSA) is proposing changes to the Federal pipeline safety regulations in 49 CFR Part 192, which cover the transportation of natural gas by pipeline. Specifically, PHMSA is proposing to chan...

  6. 75 FR 44893 - Pipeline Posting Requirements Under Section 23 of the Natural Gas Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-30

    ... and RM08-2-000; Order No. 720-B] Pipeline Posting Requirements Under Section 23 of the Natural Gas Act... R. Norris, and Cheryl A. LaFleur. Pipeline Posting Requirements under Section 23 of the Natural Gas...) issued Order No. 720 requiring interstate and certain major non-interstate natural gas pipelines to post...

  7. 75 FR 23729 - Orders Finding that the (1) Phys,1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-04

    ... pipelines bring in natural gas from fields in the Gulf Coast region and ship it to major consumption centers...Btu per day. \\22\\ The term ``hub'' refers to a juncture where two or more natural gas pipelines are..., serves as a juncture for 13 different pipelines. These pipelines bring in natural gas from fields in the...

  8. 77 FR 63806 - Southern LNG Company, L.L.C.; Application for Long-Term Authorization To Export Liquefied Natural...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-17

    ... pipelines of Southern Natural Gas Company, L.L.C., Elba Express Company, L.L.C., Carolina Gas Transmission Corporation, and the indirect connects with interstate pipelines of Transcontinental Gas Pipe Line Company... permit gas to be (1) received by pipeline at the Elba Island Terminal, with these pipelines having...

  9. 77 FR 48138 - Notice of Intent To Prepare an Environmental Impact Statement for the Planned Jordan Cove...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-13

    ... No. PF12-7-000: Pacific Connector Gas Pipeline LP--Docket No. PF12-17-000] Notice of Intent To..., Oregon, and Pacific Connector Gas Pipeline LP's (Pacific Connector) proposed pipeline project crossing... gas (LNG) terminal is in the public interest, and whether the Pacific Connector pipeline is in the...

  10. 49 CFR 195.581 - Which pipelines must I protect against atmospheric corrosion and what coating material may I use?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Which pipelines must I protect against atmospheric... Corrosion Control § 195.581 Which pipelines must I protect against atmospheric corrosion and what coating... the prevention of atmospheric corrosion. (c) Except portions of pipelines in offshore splash zones or...

  11. 49 CFR 195.581 - Which pipelines must I protect against atmospheric corrosion and what coating material may I use?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Which pipelines must I protect against atmospheric... Corrosion Control § 195.581 Which pipelines must I protect against atmospheric corrosion and what coating... the prevention of atmospheric corrosion. (c) Except portions of pipelines in offshore splash zones or...

  12. 49 CFR 195.581 - Which pipelines must I protect against atmospheric corrosion and what coating material may I use?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Which pipelines must I protect against atmospheric... Corrosion Control § 195.581 Which pipelines must I protect against atmospheric corrosion and what coating... the prevention of atmospheric corrosion. (c) Except portions of pipelines in offshore splash zones or...

  13. 76 FR 5580 - Eagle Crest Energy Company; Notice of Applicant-Proposed Water Pipeline Route for the Proposed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-01

    ... Hydroelectric Project (Eagle Mountain Project). This notice describes the water supply pipeline route proposed... property that would be crossed by the proposed water supply pipeline. We are currently soliciting comments on the proposed water supply pipeline and the draft EIS. Additionally, as discussed below, we will be...

  14. Natural Gas Compressor Stations on the Interstate Pipeline Network: Developments Since 1996

    EIA Publications

    2007-01-01

    This special report looks at the use of natural gas pipeline compressor stations on the interstate natural gas pipeline network that serves the lower 48 states. It examines the compression facilities added over the past 10 years and how the expansions have supported pipeline capacity growth intended to meet the increasing demand for natural gas.

  15. 78 FR 8699 - Pipeline Safety: Information Collection Activities, Revision to Annual Report for Hazardous...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-06

    ... returning it to you via the U.S. mail. Please note that due to delays in the delivery of U.S. mail to... hazardous liquid pipeline industry. B. Proposed Changes to the Annual Report for Hazardous Liquid Pipeline... of the regulated hazardous liquid pipeline industry already collects this information on a by- state...

  16. 30 CFR 250.1009 - Requirements to obtain pipeline right-of-way grants.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... political subdivisions of States. (b) A right-of-way shall include the site on which the pipeline and... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Requirements to obtain pipeline right-of-way... Rights-of-Way § 250.1009 Requirements to obtain pipeline right-of-way grants. (a) In addition to...

  17. 49 CFR 195.12 - What requirements apply to low-stress pipelines in rural areas?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false What requirements apply to low-stress pipelines in... low-stress pipelines in rural areas? (a) General. This Section sets forth the requirements for each category of low-stress pipeline in a rural area set forth in paragraph (b) of this Section. This Section...

  18. Integrated surface management for pipeline construction: The Mid-America Pipeline Company Four Corners Project

    Treesearch

    Maria L. Sonett

    1999-01-01

    Integrated surface management techniques for pipeline construction through arid and semi-arid rangeland ecosystems are presented in a case history of a 412-mile pipeline construction project in New Mexico. Planning, implementation and monitoring for restoration of surface hydrology, soil stabilization, soil cover, and plant species succession are discussed. Planning...

  19. 76 FR 79673 - Tennessee Gas Pipeline Company, L.L.C.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-22

    ... Pipeline Company, L.L.C.; Notice of Application On December 9, 2011, Tennessee Gas Pipeline Company, L.L.C... (Commission) an application under section 7(c) of the Natural Gas Act (NGA), as amended, and part 157 of the... Rocan, Senior Counsel, Tennessee Gas Pipeline Company, L.L.C., 1001 Louisiana Street, Houston, Texas...

  20. 77 FR 8247 - Tennessee Gas Pipeline Company, L.L.C. Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-14

    ... Pipeline Company, L.L.C. Notice of Application Take notice that on February 2, 2012, Tennessee Gas Pipeline Company, L.L.C. (Tennessee), 1001 Louisiana Street, Houston, Texas 77002, filed an application in Docket... Gas Pipeline Company, L.L.C., 1001 Louisiana Street, Houston, Texas 77002, by telephone at (713) 420...

  1. 76 FR 76707 - Brian Hamilton; El Paso Natural Gas and El Paso Western Pipelines; Notice of Complaint

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-08

    ...; El Paso Natural Gas and El Paso Western Pipelines; Notice of Complaint Take notice that on December 2... Paso Natural Gas and El Paso Western Pipelines (Respondents) alleging that the Respondents failed to... a high pressure interstate natural gas pipeline. The Complainant certifies that copies of the...

  2. 78 FR 67350 - Natural Gas Pipeline Company of America LLC; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-12

    ... Pipeline Company of America LLC; Notice of Application Take notice that on October 18, 2013 Natural Gas Pipeline Company of America LLC (Natural), at 3250 Lacey Road, Downers Grove, IL 60615, filed an..., Natural Gas Pipeline Company of America LLC, 3250 Lacey Road, Suite 700, Downers Grove, IL 60515, or by...

  3. 30 CFR 250.1006 - How must I decommission and take out of service a DOI pipeline?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... a DOI pipeline? 250.1006 Section 250.1006 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT... out of service a DOI pipeline? (a) The requirements for decommissioning pipelines are listed in § 250.1750 through § 250.1754. (b) The table in this section lists the requirements if you take a DOI...

  4. Acoustic system for communication in pipelines

    DOEpatents

    Martin, II, Louis Peter; Cooper, John F [Oakland, CA

    2008-09-09

    A system for communication in a pipe, or pipeline, or network of pipes containing a fluid. The system includes an encoding and transmitting sub-system connected to the pipe, or pipeline, or network of pipes that transmits a signal in the frequency range of 3-100 kHz into the pipe, or pipeline, or network of pipes containing a fluid, and a receiver and processor sub-system connected to the pipe, or pipeline, or network of pipes containing a fluid that receives said signal and uses said signal for a desired application.

  5. Development of Protective Coatings for Co-Sequestration Processes and Pipelines

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bierwagen, Gordon; Huang, Yaping

    2011-11-30

    The program, entitled Development of Protective Coatings for Co-Sequestration Processes and Pipelines, examined the sensitivity of existing coating systems to supercritical carbon dioxide (SCCO2) exposure and developed new coating system to protect pipelines from their corrosion under SCCO2 exposure. A literature review was also conducted regarding pipeline corrosion sensors to monitor pipes used in handling co-sequestration fluids. Research was to ensure safety and reliability for a pipeline involving transport of SCCO2 from the power plant to the sequestration site to mitigate the greenhouse gas effect. Results showed that one commercial coating and one designed formulation can both be supplied asmore » potential candidates for internal pipeline coating to transport SCCO2.« less

  6. 25 CFR 169.25 - Oil and gas pipelines.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Oil and gas pipelines. 169.25 Section 169.25 Indians....25 Oil and gas pipelines. (a) The Act of March 11, 1904 (33 Stat. 65), as amended by the Act of March 2, 1917 (39 Stat. 973; 25 U.S.C. 321), authorizes right-of-way grants for oil and gas pipelines...

  7. 25 CFR 169.25 - Oil and gas pipelines.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Oil and gas pipelines. 169.25 Section 169.25 Indians....25 Oil and gas pipelines. (a) The Act of March 11, 1904 (33 Stat. 65), as amended by the Act of March 2, 1917 (39 Stat. 973; 25 U.S.C. 321), authorizes right-of-way grants for oil and gas pipelines...

  8. Still Falling through the Cracks: Revisiting the Latina/o Education Pipeline. CSRC Research Report. Number 19

    ERIC Educational Resources Information Center

    Perez Huber, Lindsay; Malagón, Maria C.; Ramirez, Brianna R.; Gonzalez, Lorena Camargo; Jimenez, Alberto; Vélez, Verónica N.

    2015-01-01

    The first CSRC Research Report to examine the Latina/o education pipeline, "Falling through the Cracks: Critical Transitions in the Latina/o Educational Pipeline" (Pérez Huber et al. 2006), inaugurated a series of reports that have sought to address critical issues related to the Latina/o education pipeline and to provide policy…

  9. 75 FR 23704 - Order Finding That the NWP Rockies Financial Basis Contract Traded on the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-04

    ..., serves as a juncture for 13 different pipelines. These pipelines bring in natural gas from fields in the... a juncture where two or more natural gas pipelines are connected. Hubs also serve as pricing points... Pipeline draws natural gas supplies from the Rocky Mountain region and ships it along a 3,900-mile, bi...

  10. 77 FR 48878 - Approval and Promulgation of Federal Implementation Plan for Oil and Natural Gas Well Production...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-15

    ... the sales natural gas pipeline or to an emissions control unit when a natural gas sales pipeline is... vapor recovery unit (VRU) to be injected into a natural gas sales pipeline for conveyance to a natural gas plant. In the event that pipeline injection of recoverable natural gas is temporarily infeasible...

  11. 75 FR 23690 - Order Finding That the NGPL TxOk Financial Basis Contract Traded on the IntercontinentalExchange...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-04

    ... particular calendar month at the Natural Gas Pipeline Co. of America's (``NGPL's'') TxOk \\12\\ hub, as..., serves as a juncture for 13 different pipelines. These pipelines bring in natural gas from fields in the... a juncture where two or more natural gas pipelines are connected. Hubs also serve as pricing points...

  12. A Conceptual Model of the Air Force Logistics Pipeline

    DTIC Science & Technology

    1989-09-01

    Contracting Process . ....... 138 Industrial Capacity .. ......... 140 The Disposal Pipeline Subsystem ....... 142 Collective Pipeline Models...Explosion of " Industry ," Acquisition and Production Process .... ............ 202 60. First Level Explosion of "Attrition," the Disposal Process...Terminology and Phrases, a publication of The American Production and Inventory Control Society ( APICS ). This dictionary defines 5 "pipeline stock" as the

  13. 25 CFR 169.25 - Oil and gas pipelines.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false Oil and gas pipelines. 169.25 Section 169.25 Indians....25 Oil and gas pipelines. (a) The Act of March 11, 1904 (33 Stat. 65), as amended by the Act of March 2, 1917 (39 Stat. 973; 25 U.S.C. 321), authorizes right-of-way grants for oil and gas pipelines...

  14. 25 CFR 169.25 - Oil and gas pipelines.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false Oil and gas pipelines. 169.25 Section 169.25 Indians....25 Oil and gas pipelines. (a) The Act of March 11, 1904 (33 Stat. 65), as amended by the Act of March 2, 1917 (39 Stat. 973; 25 U.S.C. 321), authorizes right-of-way grants for oil and gas pipelines...

  15. 25 CFR 169.25 - Oil and gas pipelines.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true Oil and gas pipelines. 169.25 Section 169.25 Indians....25 Oil and gas pipelines. (a) The Act of March 11, 1904 (33 Stat. 65), as amended by the Act of March 2, 1917 (39 Stat. 973; 25 U.S.C. 321), authorizes right-of-way grants for oil and gas pipelines...

  16. Minority Students of Color and the Psychology Graduate Pipeline: Disquieting and Encouraging Trends, 1989-2003

    ERIC Educational Resources Information Center

    Maton, Kenneth I.; Kohout, Jessica L.; Wicherski, Marlene; Leary, George E.; Vinokurov, Andrey

    2006-01-01

    Trends since 1989 in the minority graduate pipeline in psychology are examined, with special focus on trends in recent years. Encouraging trends generally outweigh troubling ones at lower levels of the pipeline. However, in recent years disquieting trends dominate at the higher pipeline levels. Promising trends include a rise in the percentage (to…

  17. Problematizing the STEM Pipeline Metaphor: Is the STEM Pipeline Metaphor Serving Our Students and the STEM Workforce?

    ERIC Educational Resources Information Center

    Cannady, Matthew A.; Greenwald, Eric; Harris, Kimberly N.

    2014-01-01

    Researchers and policy makers often use the metaphor of an ever-narrowing pipeline to describe the trajectory to a science, technology, engineering or mathematics (STEM) degree or career. This study interrogates the appropriateness of the STEM pipeline as the dominant frame for understanding and making policies related to STEM career trajectories.…

  18. Trans-Alaska crude oil pipeline. a petition for a waiver of compliance for liquid pipeline girth weld defects at the Valdez Terminal

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1979-02-08

    A petition for a waiver of compliance for liquid pipeline girth weld defects at the Valdez Terminal of Alyeska Pipeline Service Co. has been granted by the U.S. Materials Transportation Bureau. The waiver covers 217 welds which contain defects such as arc burns not allowed in the regulations.

  19. 75 FR 2134 - Northern Border Pipeline Company; Notice of Intent To Prepare an Environmental Assessment for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-14

    ... consist of the following facilities: Approximately 8.9 miles of 16-inch-diameter pipeline; One pig\\1\\ launcher assembly; and \\1\\ A pipeline ``pig'' is a device designed to internally clean or inspect the pipeline. A pig launcher/receiver is an aboveground facility where pigs are inserted or retrieved from the...

  20. A field investigation on the effects of background erosion on the free span development of a submarine pipeline

    NASA Astrophysics Data System (ADS)

    Wen, Shipeng; Xu, Jishang; Hu, Guanghai; Dong, Ping; Shen, Hong

    2015-08-01

    The safety of submarine pipelines is largely influenced by free spans and corrosions. Previous studies on free spans caused by seabed scours are mainly based on the stable environment, where the background seabed scour is in equilibrium and the soil is homogeneous. To study the effects of background erosion on the free span development of subsea pipelines, a submarine pipeline located at the abandoned Yellow River subaqueous delta lobe was investigated with an integrated surveying system which included a Multibeam bathymetric system, a dual-frequency side-scan sonar, a high resolution sub-bottom profiler, and a Magnetic Flux Leakage (MFL) sensor. We found that seabed homogeneity has a great influence on the free span development of the pipeline. More specifically, for homogeneous background scours, the morphology of scour hole below the pipeline is quite similar to that without the background scour, whereas for inhomogeneous background scour, the nature of spanning is mainly dependent on the evolution of seabed morphology near the pipeline. Magnetic Flux Leakage (MFL) detection results also reveal the possible connection between long free spans and accelerated corrosion of the pipeline.

Top