Sample records for waste remediation program

  1. Tank waste remediation system privatization infrastructure program requirements and document management process guide

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ROOT, R.W.

    1999-05-18

    This guide provides the Tank Waste Remediation System Privatization Infrastructure Program management with processes and requirements to appropriately control information and documents in accordance with the Tank Waste Remediation System Configuration Management Plan (Vann 1998b). This includes documents and information created by the program, as well as non-program generated materials submitted to the project. It provides appropriate approval/control, distribution and filing systems.

  2. Tank waste remediation system nuclear criticality safety program management review

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BRADY RAAP, M.C.

    1999-06-24

    This document provides the results of an internal management review of the Tank Waste Remediation System (TWRS) criticality safety program, performed in advance of the DOE/RL assessment for closure of the TWRS Nuclear Criticality Safety Issue, March 1994. Resolution of the safety issue was identified as Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone M-40-12, due September 1999.

  3. Object reasoning for waste remediation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pennock, K.A.; Bohn, S.J.; Franklin, A.L.

    1991-08-01

    A large number of contaminated waste sites across the United States await size remediation efforts. These sites can be physically complex, composed of multiple, possibly interacting, contaminants distributed throughout one or more media. The Remedial Action Assessment System (RAAS) is being designed and developed to support decisions concerning the selection of remediation alternatives. The goal of this system is to broaden the consideration of remediation alternatives, while reducing the time and cost of making these considerations. The Remedial Action Assessment System is a hybrid system, designed and constructed using object-oriented, knowledge- based systems, and structured programming techniques. RAAS uses amore » combination of quantitative and qualitative reasoning to consider and suggest remediation alternatives. The reasoning process that drives this application is centered around an object-oriented organization of remediation technology information. This paper describes the information structure and organization used to support this reasoning process. In addition, the paper describes the level of detail of the technology related information used in RAAS, discusses required assumptions and procedural implications of these assumptions, and provides rationale for structuring RAAS in this manner. 3 refs., 3 figs.« less

  4. 40 CFR 761.61 - PCB remediation waste.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    .... Subpart N of this part provides a method for collecting new site characterization data or for assessing... left after cleanup is completed. (i) Bulk PCB remediation waste. Bulk PCB remediation waste includes... similar material of minimum thickness spread over the area where remediation waste was removed or left in...

  5. 40 CFR 761.61 - PCB remediation waste.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 30 2010-07-01 2010-07-01 false PCB remediation waste. 761.61 Section... PROHIBITIONS Storage and Disposal § 761.61 PCB remediation waste. This section provides cleanup and disposal options for PCB remediation waste. Any person cleaning up and disposing of PCBs managed under this section...

  6. Tank waste remediation system configuration management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vann, J.M.

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Projectmore » personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.« less

  7. WASTE PACKAGE REMEDIATION SYSTEM DESCRIPTION DOCUMENT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    N.D. Sudan

    2000-06-22

    The Waste Package Remediation System remediates waste packages (WPs) and disposal containers (DCs) in one of two ways: preparation of rejected DC closure welds for repair or opening of the DC/WP. DCs are brought to the Waste Package Remediation System for preparation of rejected closure welds if testing of the closure weld by the Disposal Container Handling System indicates an unacceptable, but repairable, welding flaw. DC preparation of rejected closure welds will require removal of the weld in such a way that the Disposal Container Handling System may resume and complete the closure welding process. DCs/WPs are brought to themore » Waste Package Remediation System for opening if the Disposal Container Handling System testing of the DC closure weld indicates an unrepairable welding flaw, or if a WP is recovered from the subsurface repository because suspected damage to the WP or failure of the WP has occurred. DC/WP opening will require cutting of the DC/WP such that a temporary seal may be installed and the waste inside the DC/WP removed by another system. The system operates in a Waste Package Remediation System hot cell located in the Waste Handling Building that has direct access to the Disposal Container Handling System. One DC/WP at a time can be handled in the hot cell. The DC/WP arrives on a transfer cart, is positioned within the cell for system operations, and exits the cell without being removed from the cart. The system includes a wide variety of remotely operated components including a manipulator with hoist and/or jib crane, viewing systems, machine tools for opening WPs, and equipment used to perform pressure and gas composition sampling. Remotely operated equipment is designed to facilitate DC/WP decontamination and hot cell equipment maintenance, and interchangeable components are provided where appropriate. The Waste Package Remediation System interfaces with the Disposal Container Handling System for the receipt and transport of WPs and DCs

  8. 77 FR 12293 - PCBs Bulk Product v. Remediation Waste

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    .... Remediation Waste AGENCY: Environmental Protection Agency (EPA). ACTION: Request for Public Comment. SUMMARY... biphenyl (PCB) disposal regulations regarding PCB bulk product and PCB remediation waste. The proposed... regarding PCB bulk product and PCB remediation waste under regulations promulgated at 40 CFR part 761. The...

  9. Remediation of Groundwater Contaminated by Nuclear Waste

    NASA Astrophysics Data System (ADS)

    Parker, Jack; Palumbo, Anthony

    2008-07-01

    A Workshop on Accelerating Development of Practical Field-Scale Bioremediation Models; An Online Meeting, 23 January to 20 February 2008; A Web-based workshop sponsored by the U.S. Department of Energy Environmental Remediation Sciences Program (DOE/ERSP) was organized in early 2008 to assess the state of the science and knowledge gaps associated with the use of computer models to facilitate remediation of groundwater contaminated by wastes from Cold War era nuclear weapons development and production. Microbially mediated biological reactions offer a potentially efficient means to treat these sites, but considerable uncertainty exists in the coupled biological, chemical, and physical processes and their mathematical representation.

  10. ORNL Remedial Action Program strategy (FY 1987-FY 1992)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Trabalka, J.R.; Myrick, T.E.

    1987-12-01

    Over 40 years of Oak Ridge National Laboratory (ORNL) operations have produced a diverse legacy of contaminated inactive facilities, research areas, and waste disposal areas that are potential candidates for remedial action. The ORNL Remedial Action Program (RAP) represents a comprehensive effort to meet new regulatory requirements and ensure adequate protection of on-site workers, the public, and the environment by providing appropriate corrective measures at over 130 sites contaminated historically with radioactive, hazardous chemical, or mixed wastes. A structured path of program planning, site characterization, alternatives assessment, technology development, engineering design, continued site maintenance and surveillance, interim corrective action, andmore » eventual site closure or decommissioning is required to meet these objectives. This report documents the development of the Remedial Action Program, through its preliminary characterization, regulatory interface, and strategy development activities. It provides recommendations for a comprehensive, long-term strategy consistent with existing technical, institutional, and regulatory information, along with a six-year plan for achieving its initial objectives. 53 refs., 8 figs., 12 tabs.« less

  11. 40 CFR 761.269 - Sampling liquid PCB remediation waste.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 30 2010-07-01 2010-07-01 false Sampling liquid PCB remediation waste..., AND USE PROHIBITIONS Cleanup Site Characterization Sampling for PCB Remediation Waste in Accordance with § 761.61(a)(2) § 761.269 Sampling liquid PCB remediation waste. (a) If the liquid is single phase...

  12. High altitude mine waste remediation -- Implementation of the Idarado remedial action plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hardy, A.J.; Redmond, J.V.; River, R.A.

    1999-07-01

    The Idarado Mine in Colorado's San Juan Mountains includes 11 tailing areas, numerous waste rock dumps, and a large number of underground openings connected by over 100 miles of raises and drifts. The tailings and mine wastes were generated from different mining and milling operations between 1975 and 1978. the Idarado Remedial Action Plan (RAP) was an innovative 5-year program developed for remediating the impacts of historic mining activities in the San Miguel River and Red Mountain Creek drainages. The challenges during implementation included seasonal access limitations due to the high altitude construction areas, high volumes of runoff during snowmore » melt, numerous abandoned underground openings and stopped-out veins, and high profile sites adjacent to busy jeep trails and a major ski resort town. Implementation of the RAP has included pioneering efforts in engineering design and construction of remedial measures. Innovative engineering designs included direct revegetation techniques for the stabilization of tailings piles, concrete cutoff walls and French drains to control subsurface flows, underground water controls that included pipelines, weeplines, and portal collection systems, and various underground structures to collect and divert subsurface flows often exceeding 2,000 gpm. Remote work locations have also required the use of innovative construction techniques such as heavy lift helicopters to move construction materials to mines above 10,000 feet. This paper describes the 5-year implementation program which has included over 1,000,000 cubic yards of tailing regrading, application of 5,000 tons of manure and 26,000 tons of limestone, and construction of over 10,000 feet of pipeline and approximately 45,000 feet of diversion channel.« less

  13. Evaluation of Final Radiological Conditions at Areas of the Niagara Falls Storage Site Remediated under the Formerly Utilized Sites Remedial Action Program -12184

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clayton, Christopher; Kothari, Vijendra; Starr, Ken

    2012-02-26

    The U. S. Department of Energy (DOE) methods and protocols allow evaluation of remediation and final site conditions to determine if remediated sites remain protective. Two case studies are presented that involve the Niagara Falls Storage Site (NFSS) and associated vicinity properties (VPs), which are being remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). These properties are a part of the former Lake Ontario Ordnance Works (LOOW). In response to stakeholders concerns about whether certain remediated NFSS VPs were putting them at risk, DOE met with stakeholders and agreed to evaluate protectiveness. Documentation in the DOE records collectionmore » adequately described assessed and final radiological conditions at the completed VPs. All FUSRAP wastes at the completed sites were cleaned up to meet DOE guidelines for unrestricted use. DOE compiled the results of the investigation in a report that was released for public comment. In conducting the review of site conditions, DOE found that stakeholders were also concerned about waste from the Separations Process Research Unit (SPRU) at the Knolls Atomic Power Laboratory (KAPL) that was handled at LOOW. DOE agreed to determine if SPRU waste remained at that needed to be remediated. DOE reviewed records of waste characterization, historical handling locations and methods, and assessment and remediation data. DOE concluded that the SPRU waste was remediated on the LOOW to levels that pose no unacceptable risk and allow unrestricted use and unlimited exposure. This work confirms the following points as tenets of an effective long-term surveillance and maintenance (LTS&M) program: Stakeholder interaction must be open and transparent, and DOE must respond promptly to stakeholder concerns. DOE, as the long-term custodian, must collect and preserve site records in order to demonstrate that remediated sites pose no unacceptable risk. DOE must continue to maintain constructive relationships with

  14. 40 CFR 761.269 - Sampling liquid PCB remediation waste.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 31 2011-07-01 2011-07-01 false Sampling liquid PCB remediation waste. 761.269 Section 761.269 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC..., AND USE PROHIBITIONS Cleanup Site Characterization Sampling for PCB Remediation Waste in Accordance...

  15. 40 CFR 761.269 - Sampling liquid PCB remediation waste.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 32 2013-07-01 2013-07-01 false Sampling liquid PCB remediation waste. 761.269 Section 761.269 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC..., AND USE PROHIBITIONS Cleanup Site Characterization Sampling for PCB Remediation Waste in Accordance...

  16. 40 CFR 761.269 - Sampling liquid PCB remediation waste.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 31 2014-07-01 2014-07-01 false Sampling liquid PCB remediation waste. 761.269 Section 761.269 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC..., AND USE PROHIBITIONS Cleanup Site Characterization Sampling for PCB Remediation Waste in Accordance...

  17. 40 CFR 761.269 - Sampling liquid PCB remediation waste.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 32 2012-07-01 2012-07-01 false Sampling liquid PCB remediation waste. 761.269 Section 761.269 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC..., AND USE PROHIBITIONS Cleanup Site Characterization Sampling for PCB Remediation Waste in Accordance...

  18. Evaluation of Final Radiological Conditions at Areas of the Niagara Falls Storage Site Remediated under the Formerly Utilized Sites Remedial Action Program - 12184

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clayton, Christopher; Kothari, Vijendra; Starr, Ken

    2012-07-01

    The U.S. Department of Energy (DOE) methods and protocols allow evaluation of remediation and final site conditions to determine if remediated sites remain protective. Two case studies are presented that involve the Niagara Falls Storage Site (NFSS) and associated vicinity properties (VPs), which are being remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). These properties are a part of the former Lake Ontario Ordnance Works (LOOW). In response to stakeholders concerns about whether certain remediated NFSS VPs were putting them at risk, DOE met with stakeholders and agreed to evaluate protectiveness. Documentation in the DOE records collection adequatelymore » described assessed and final radiological conditions at the completed VPs. All FUSRAP wastes at the completed sites were cleaned up to meet DOE guidelines for unrestricted use. DOE compiled the results of the investigation in a report that was released for public comment. In conducting the review of site conditions, DOE found that stakeholders were also concerned about waste from the Separations Process Research Unit (SPRU) at the Knolls Atomic Power Laboratory (KAPL) that was handled at LOOW. DOE agreed to determine if SPRU waste remained at that needed to be remediated. DOE reviewed records of waste characterization, historical handling locations and methods, and assessment and remediation data. DOE concluded that the SPRU waste was remediated on the LOOW to levels that pose no unacceptable risk and allow unrestricted use and unlimited exposure. This work confirms the following points as tenets of an effective long-term surveillance and maintenance (LTS and M) program: - Stakeholder interaction must be open and transparent, and DOE must respond promptly to stakeholder concerns. - DOE, as the long-term custodian, must collect and preserve site records in order to demonstrate that remediated sites pose no unacceptable risk. - DOE must continue to maintain constructive

  19. Tank waste remediation system multi-year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-09-01

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less

  20. Tank waste remediation system multi-year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less

  1. 40 CFR 761.265 - Sampling bulk PCB remediation waste and porous surfaces.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 30 2010-07-01 2010-07-01 false Sampling bulk PCB remediation waste..., DISTRIBUTION IN COMMERCE, AND USE PROHIBITIONS Cleanup Site Characterization Sampling for PCB Remediation Waste in Accordance with § 761.61(a)(2) § 761.265 Sampling bulk PCB remediation waste and porous surfaces...

  2. 40 CFR 761.61 - PCB remediation waste.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... surface waters. (6) Solvent disposal, recovery, and/or reuse is in accordance with relevant provisions of... waste shall dispose of or reuse them using one of the following methods: (A) Non-liquid cleaning...-site cleanup and disposal of PCB remediation waste, a uniform placement of concrete, asphalt, or...

  3. 40 CFR 761.61 - PCB remediation waste.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... surface waters. (6) Solvent disposal, recovery, and/or reuse is in accordance with relevant provisions of... waste shall dispose of or reuse them using one of the following methods: (A) Non-liquid cleaning...-site cleanup and disposal of PCB remediation waste, a uniform placement of concrete, asphalt, or...

  4. Tank waste remediation system configuration management implementation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vann, J.M.

    1998-03-31

    The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from themore » life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program.« less

  5. 76 FR 63509 - Small Business Size Standards: Administrative and Support, Waste Management and Remediation Services

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-12

    ... Small Business Size Standards: Administrative and Support, Waste Management and Remediation Services... Standards: Administrative and Support, Waste Management and Remediation Services AGENCY: U.S. Small Business...) Sector 56, Administrative and Support, Waste Management and Remediation Services. As part of its ongoing...

  6. Transboundary movement of hazardous wastes into Lebanon: Part 2. Environmental impacts and the need for remedial actions.

    PubMed

    Jurdi, Mey

    2002-01-01

    This paper discusses the transboundary movement of hazardous wastes (the "silent trade") into Lebanon in terms of environmental impacts and remedial actions. It highlights the projected impacts on potable-water quality, the exposure of the groundwater aquifer, and the status of quality control programs. The public responses to these problems are presented and characterized in terms of mistrust and rejection. The constraints developing countries face in handling environmental impacts and undertaking remedial actions are emphasized. The vision derived from the decade covered (1990-2000) emphasizes the need for international collaboration, through Basel Convention efforts, to control the transboundary movement of hazardous wastes and the disposal of such wastes. The need for "global harmonization" should be given serious consideration.

  7. Tank waste remediation system systems engineering management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peck, L.G.

    1998-01-08

    This Systems Engineering Management Plan (SEMP) describes the Tank Waste Remediation System (TWRS) implementation of the US Department of Energy (DOE) systems engineering policy provided in 97-IMSD-193. The SEMP defines the products, process, organization, and procedures used by the TWRS Project to implement the policy. The SEMP will be used as the basis for tailoring the systems engineering applications to the development of the physical systems and processes necessary to achieve the desired end states of the program. It is a living document that will be revised as necessary to reflect changes in systems engineering guidance as the program evolves.more » The US Department of Energy-Headquarters has issued program management guidance, DOE Order 430. 1, Life Cycle Asset Management, and associated Good Practice Guides that include substantial systems engineering guidance.« less

  8. 77 FR 72691 - Small Business Size Standards: Administrative and Support, Waste Management and Remediation Services

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-06

    ...: Administrative and Support, Waste Management and Remediation Services AGENCY: U.S. Small Business Administration..., Administrative and Support, Waste Management and Remediation Services. As part of its ongoing comprehensive... size standard for Environmental Remediation Services, an ``exception'' under NAICS 562910, Remediation...

  9. 49 CFR 573.14 - Accelerated remedy program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Accelerated remedy program. 573.14 Section 573.14... § 573.14 Accelerated remedy program. (a) An accelerated remedy program is one in which the manufacturer expands the sources of replacement parts needed to remedy the defect or noncompliance, or expands the...

  10. 49 CFR 573.14 - Accelerated remedy program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Accelerated remedy program. 573.14 Section 573.14... § 573.14 Accelerated remedy program. (a) An accelerated remedy program is one in which the manufacturer expands the sources of replacement parts needed to remedy the defect or noncompliance, or expands the...

  11. 40 CFR 761.265 - Sampling bulk PCB remediation waste and porous surfaces.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 31 2011-07-01 2011-07-01 false Sampling bulk PCB remediation waste and porous surfaces. 761.265 Section 761.265 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY..., DISTRIBUTION IN COMMERCE, AND USE PROHIBITIONS Cleanup Site Characterization Sampling for PCB Remediation Waste...

  12. 40 CFR 761.265 - Sampling bulk PCB remediation waste and porous surfaces.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 31 2014-07-01 2014-07-01 false Sampling bulk PCB remediation waste and porous surfaces. 761.265 Section 761.265 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY..., DISTRIBUTION IN COMMERCE, AND USE PROHIBITIONS Cleanup Site Characterization Sampling for PCB Remediation Waste...

  13. 40 CFR 761.265 - Sampling bulk PCB remediation waste and porous surfaces.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 32 2013-07-01 2013-07-01 false Sampling bulk PCB remediation waste and porous surfaces. 761.265 Section 761.265 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY..., DISTRIBUTION IN COMMERCE, AND USE PROHIBITIONS Cleanup Site Characterization Sampling for PCB Remediation Waste...

  14. 40 CFR 761.265 - Sampling bulk PCB remediation waste and porous surfaces.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 32 2012-07-01 2012-07-01 false Sampling bulk PCB remediation waste and porous surfaces. 761.265 Section 761.265 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY..., DISTRIBUTION IN COMMERCE, AND USE PROHIBITIONS Cleanup Site Characterization Sampling for PCB Remediation Waste...

  15. Chemical Remediation of Nickel(II) Waste: A Laboratory Experiment for General Chemistry Students

    ERIC Educational Resources Information Center

    Corcoran, K. Blake; Rood, Brian E.; Trogden, Bridget G.

    2011-01-01

    This project involved developing a method to remediate large quantities of aqueous waste from a general chemistry laboratory experiment. Aqueous Ni(II) waste from a general chemistry laboratory experiment was converted into solid nickel hydroxide hydrate with a substantial decrease in waste volume. The remediation method was developed for a…

  16. Tank waste remediation system baseline tank waste inventory estimates for fiscal year 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shelton, L.W., Westinghouse Hanford

    1996-12-06

    A set of tank-by-tank waste inventories is derived from historical waste models, flowsheet records, and analytical data to support the Tank Waste Remediation System flowsheet and retrieval sequence studies. Enabling assumptions and methodologies used to develop the inventories are discussed. These provisional inventories conform to previously established baseline inventories and are meant to serve as an interim basis until standardized inventory estimates are made available.

  17. Targeted Health Assessment for Wastes Contained at the Niagara Falls Storage Site to Guide Planning for Remedial Action Alternatives - 13428

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Busse, John; Keil, Karen; Staten, Jane

    2013-07-01

    The U.S. Army Corps of Engineers (USACE) is evaluating potential remedial alternatives at the 191-acre Niagara Falls Storage Site (NFSS) in Lewiston, New York, under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The Manhattan Engineer District (MED) and Atomic Energy Commission (AEC) brought radioactive wastes to the site during the 1940's and 1950's, and the U.S. Department of Energy (US DOE) consolidated these wastes into a 10-acre interim waste containment structure (IWCS) in the southwest portion of the site during the 1980's. The USACE is evaluating remedial alternatives for radioactive waste contained within the IWCS at the NFSS undermore » the Feasibility Study phase of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process. A preliminary evaluation of the IWCS has been conducted to assess potential airborne releases associated with uncovered wastes, particularly during waste excavation, as well as direct exposures to uncovered wastes. Key technical issues for this assessment include: (1) limitations in waste characterization data; (2) representative receptors and exposure routes; (3) estimates of contaminant emissions at an early stage of the evaluation process; (4) consideration of candidate meteorological data and air dispersion modeling approaches; and (5) estimates of health effects from potential exposures to both radionuclides and chemicals that account for recent updates of exposure and toxicity factors. Results of this preliminary health risk assessment indicate if the wastes were uncovered and someone stayed at the IWCS for a number of days to weeks, substantial doses and serious health effects could be incurred. Current controls prevent such exposures, and the controls that would be applied to protect onsite workers during remedial action at the IWCS would also effectively protect the public nearby. This evaluation provides framing context for the upcoming development and detailed evaluation of

  18. Configuration management plan for waste tank farms and the 242-A evaporator of tank waste remediation system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Laney, T.

    The configuration management architecture presented in this Configuration Management Plan is based on the functional model established by DOE-STD-1073-93, ``Guide for Operational Configuration Management Program.`` The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management.`` The CM model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOEmore » Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phases of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life cycle of the Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System.« less

  19. Regulatory Aspects Of Implementing Electrokinetic Remediation

    EPA Science Inventory

    A better understanding of the environmental impact of hazardous waste management practices has led to new environmental laws and a comprehensive regulatory program. This program is designed to address remediation of past waste management practices and to ensure that the hazardou...

  20. Guidance on the Management of Remediation Waste Under the Resource Conservation and Recovery Act (RCRA)

    EPA Pesticide Factsheets

    To assist regulators in successfully implementing RCRA requirements for remediation waste, this memorandum consolidates existing guidance on the RCRA regulations and policies that most often affect remediation waste management.

  1. USEPA'S RESEARCH PROGRAM ON REMEDIATION AND CONTAINMENT OF ARSENIC AND MERCURY IN SOILS, INDUSTRIAL WASTES, AND GROUNDWATER

    EPA Science Inventory

    In the U.S. and around the world, mercury and arsenic contaminated soils, industrial wastes, and groundwater are difficult to effectively and cheaply remediate and contain. Mercury is a serious health concern and has been identified as a contaminant in the air, soil, sediment, su...

  2. READING AND WRITING, THE REMEDIAL PROGRAM.

    ERIC Educational Resources Information Center

    Euclid English Demonstration Center, OH.

    THE PAPERS IN THIS COLLECTION EXPLAIN THE JUNIOR HIGH SCHOOL REMEDIAL PROGRAM IN READING AND WRITING DEVELOPED BY THE EUCLID ENGLISH DEMONSTRATION CENTER, THEY ARE (1) "REMEDIAL CLASSES AND THE TOTAL ENGLISH PROGRAM," BY GEORGE HILLOCKS, (2) "DEFINITION, ORIGIN, AND TREATMENT OF UNDERACHIEVEMENT," BY JANE W. KESSLER, (3)…

  3. Protecting Lake Ontario - Treating Wastewater from the Remediated Low-Level Radioactive Waste Management Facility - 13227

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Freihammer, Till; Chaput, Barb; Vandergaast, Gary

    2013-07-01

    The Port Granby Project is part of the larger Port Hope Area Initiative, a community-based program for the development and implementation of a safe, local, long-term management solution for historic low level radioactive waste (LLRW) and marginally contaminated soils (MCS). The Port Granby Project involves the relocation and remediation of up to 0.45 million cubic metres of such waste from the current Port Granby Waste Management Facility located in the Municipality of Clarington, Ontario, adjacent to the shoreline of Lake Ontario. The waste material will be transferred to a new suitably engineered Long-Term Waste Management Facility (LTWMF) to be locatedmore » inland approximately 700 m from the existing site. The development of the LTWMF will include construction and commissioning of a new Wastewater Treatment Plant (WWTP) designed to treat wastewater consisting of contaminated surface run off and leachate generated during the site remediation process at the Port Granby Waste Management Facility as well as long-term leachate generated at the new LTWMF. Numerous factors will influence the variable wastewater flow rates and influent loads to the new WWTP during remediation. The treatment processes will be comprised of equalization to minimize impacts from hydraulic peaks, fine screening, membrane bioreactor technology, and reverse osmosis. The residuals treatment will comprise of lime precipitation, thickening, dewatering, evaporation and drying. The distribution of the concentration of uranium and radium - 226 over the various process streams in the WWTP was estimated. This information was used to assess potential worker exposure to radioactivity in the various process areas. A mass balance approach was used to assess the distribution of uranium and radium - 226, by applying individual contaminant removal rates for each process element of the WTP, based on pilot scale results and experience-based assumptions. The mass balance calculations were repeated for

  4. TECHNICAL GUIDANCE DOCUMENT: CONSTRUCTION QUALITY MANAGEMENT FOR REMEDIAL ACTION AND REMEDIAL DESIGN WASTE CONTAINMENT SYSTEMS

    EPA Science Inventory

    This Technical Guidance Document is intended to augment the numerous construction quality control and construction quality assurance (CQC and CQA) documents that are available far materials associated with waste containment systems developed for Superfund site remediation. In ge...

  5. New Jersey state information handbook: Formerly Utilized Sites Remedial Action Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    Under the implied authority of the Atomic Energy Act of 1954, as amended, radiological surveys and research work has been conducted to determine radiological conditions at former MED/AEC sites. As of this time, 31 sites in 13 states have been identified that require or may require remedial action. This volume is one of a series produced under contract with DOE, Office of Nuclear Waste Management, by POLITECH CORPORATION to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Remedial Action Program. This Information Handbook seriesmore » contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of New Jersey. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations. The loose-leaf format used in these volumes will allow the material to be updated periodically as the Remedial Action Program progresses.« less

  6. 40 CFR 270.230 - May I perform remediation waste management activities under a RAP at a location removed from the...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... assumed to be in compliance with this requirement. (e) These alternative locations are remediation waste... 40 Protection of Environment 27 2011-07-01 2011-07-01 false May I perform remediation waste management activities under a RAP at a location removed from the area where the remediation wastes originated...

  7. 40 CFR 270.230 - May I perform remediation waste management activities under a RAP at a location removed from the...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... assumed to be in compliance with this requirement. (e) These alternative locations are remediation waste... 40 Protection of Environment 27 2014-07-01 2014-07-01 false May I perform remediation waste management activities under a RAP at a location removed from the area where the remediation wastes originated...

  8. 40 CFR 270.230 - May I perform remediation waste management activities under a RAP at a location removed from the...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... management activities under a RAP at a location removed from the area where the remediation wastes originated... management activities under a RAP at a location removed from the area where the remediation wastes originated? (a) You may request a RAP for remediation waste management activities at a location removed from the...

  9. 40 CFR 270.230 - May I perform remediation waste management activities under a RAP at a location removed from the...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... management activities under a RAP at a location removed from the area where the remediation wastes originated... management activities under a RAP at a location removed from the area where the remediation wastes originated? (a) You may request a RAP for remediation waste management activities at a location removed from the...

  10. Nuclear facility decommissioning and site remedial actions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Knox, N.P.; Webb, J.R.; Ferguson, S.D.

    1990-09-01

    The 394 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eleventh in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3)more » Formerly Utilized Sites Remedial Action Programs, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Grand Junction Remedial Action Program, (7) Uranium Mill Tailings Management, (8) Technical Measurements Center, (9) Remedial Action Program, and (10) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies.« less

  11. 40 CFR 270.230 - May I perform remediation waste management activities under a RAP at a location removed from the...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false May I perform remediation waste management activities under a RAP at a location removed from the area where the remediation wastes originated... Plans (RAPs) Obtaining A Rap for An Off-Site Location § 270.230 May I perform remediation waste...

  12. Treatment of Bottled Liquid Waste During Remediation of the Hanford 618-10 Burial Ground - 13001

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Faulk, Darrin E.; Pearson, Chris M.; Vedder, Barry L.

    2013-07-01

    A problematic waste form encountered during remediation of the Hanford Site 618-10 burial ground consists of bottled aqueous waste potentially contaminated with regulated metals. The liquid waste requires stabilization prior to landfill disposal. Prior remediation activities at other Hanford burial grounds resulted in a standard process for sampling and analyzing liquid waste using manual methods. Due to the highly dispersible characteristics of alpha contamination, and the potential for shock sensitive chemicals, a different method for bottle processing was needed for the 618-10 burial ground. Discussions with the United States Department of Energy (DOE) and United States Environmental Protection Agency (EPA)more » led to development of a modified approach. The modified approach involves treatment of liquid waste in bottles, up to one gallon per bottle, in a tray or box within the excavation of the remediation site. Bottles are placed in the box, covered with soil and fixative, crushed, and mixed with a Portland cement grout. The potential hazards of the liquid waste preclude sampling prior to treatment. Post treatment verification sampling is performed to demonstrate compliance with land disposal restrictions and disposal facility acceptance criteria. (authors)« less

  13. 75 FR 34625 - Administrative Remedy Program: Exception to Initial Filing Procedures

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-18

    ... Remedy Program: Exception to Initial Filing Procedures AGENCY: Bureau of Prisons, Justice. ACTION... Administrative Remedy Program to add an exception to initial filing of Administrative Remedy appeals at the institution level. The exception will state that formal administrative remedy requests regarding initial...

  14. Effective remediation of fish processing waste using mixed culture biofilms capable of simultaneous nitrification and denitrification.

    PubMed

    Markande, Anoop R; Kapagunta, Chandrika; Patil, Pooja S; Nayak, Binaya B

    2016-09-01

    Fish processing waste water causes pollution and eutrophication of water bodies when released untreated. Use of bacteria capable of simultaneous nitrification and denitrification (SND) as biofilms on carriers in a moving bed bioreactor (MBBR) is a popular approach but seldom used for fish processing waste water remediation. Here, we studied the variations in biofilm formation and application activities by isolates Lysinibacillus sp. HT13, Alcaligenes sp. HT15 and Proteus sp. HT37 previously reported by us. While HT13 and HT15 formed significantly higher biofilms in polystyrene microtitre plates than on carriers, HT37 exhibited highest on carriers. A consortium of the three selected bacteria grown as biofilm on MBBR carriers exhibited better remediation of ammonia (200-600 ppm and 50 mM) than the individual isolates on carriers. The mixed biofilm set on the carriers was used for nitrogenous waste removal from fish processing waste water in 2 and 20 L setups. The total nitrogen estimated by elemental analysis showed complete remediation from 250 ppm in both 2 and 20 L waste water systems within 48 h. The usual toxic nitrogenous components-ammonia, nitrite and nitrate were also remediated efficiently. © 2016 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  15. Hazardous Waste Site Remediation, Neighborhood Change, and Neighborhood Quality.

    PubMed Central

    Greenberg, M; Schneider, D

    1994-01-01

    We tested the hypothesis that neighborhoods with hazardous waste sites may no longer be undesirable places to live if they have been at least partly remediated. We collected 377 questionnaires (42% response rate) administered from within one-half mile of the number 1, 4, and 12 hazardous waste sites on the National Priority List (Superfund). These neighborhoods were rated higher quality than neighborhoods with unremediated hazardous waste sites and about the same as neighborhoods in northern New Jersey and the United States as a whole. Newer residents considered these formerly tainted areas to be opportunities to upgrade their housing and living conditions. Long-term residents retained the negative image of the blemished neighborhood. Images p542-a PMID:9679112

  16. An Ideal Remedial Reading Program.

    ERIC Educational Resources Information Center

    Boettcher, Judith A.

    An ideal secondary level remedial reading program would be based on the philosophy that both freedom and structure are required, that learning demands involvement and feedback, and that success breeds success. Such programs should be structured (i.e., based on clearly defined content and a clearly designated mode of presentation). There are many…

  17. The highly successful safe remediation of the Fernald waste pits undertaken under the privatization model

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cherry, Mark; Lojek, Dave; Murphy, Con

    2003-02-23

    Remediation of eight waste pits at the Department of Energy (DOE) Fernald site, located northwest of Cincinnati, Ohio, involves excavating approximately one million tonnes in-situ of low-level waste which were placed in pits during Fernald's production era. This unique project, one of the largest in the history of CERCLA/Superfund, includes uranium and thorium contaminated waste, soils and sludges. These wet soils and sludges are thermally dried in a processing facility to meet Department of Transportation (DOT) transportation and disposal facility waste acceptance criteria, loaded into railcars and shipped to the Envirocare waste disposal facility at Clive, Utah. This project ismore » now approximately 60% complete with more than 415,000 tonnes (460,000 tons) of waste material safely shipped in 74 unit trains to Envirocare. Work is scheduled to be completed in early 2005. Success to date demonstrates that a major DOE site remediation project can be safely and successfully executed in partnership with private industry, utilizing proven commercial best practices, existing site labor resources and support of local stakeholders. In 1997 under the DOE's privatization initiative, Fluor Fernald, Inc. (Fluor Fernald) solicited the services of the remediation industry to design, engineer, procure, construct, own and operate a facility that would undertake the remediation of the waste pits. The resulting procurement was awarded to IT Corporation, currently Shaw Environmental and Infrastructure, Inc. (Shaw). The contractor was required to finance the procurement and construction of its facilities and infrastructure. The contract was performance-based and payment would be made on the successful loadout of the waste from the facility on a per-ton basis meeting the Envirocare waste acceptance criteria. This paper details the performance to date, the challenges encountered, and the seamless partnering between DOE, the Environmental Protection Agency (EPA), Fluor Fernald, Shaw

  18. The Gunite and Associated Tanks Remediation Project Tank Waste Retrieval Performance and Lessons Learned, vol. 1 [of 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lewis, BE

    2003-10-07

    The Gunite and Associated Tanks (GAAT) Remediation Project was the first of its kind performed in the United States. Robotics and remotely operated equipment were used to successfully transfer almost 94,000 gal of remote-handled transuranic sludge containing over 81,000 Ci of radioactive contamination from nine large underground storage tanks at the Oak Ridge National Laboratory (ORNL). The sludge was transferred with over 439,000 gal of radioactive waste supernatant and {approx}420,500 gal of fresh water that was used in sluicing operations. The GAATs are located in a high-traffic area of ORNL near a main thoroughfare. A phased and integrated approach tomore » waste retrieval operations was used for the GAAT Remediation Project. The project promoted safety by obtaining experience from low-risk operations in the North Tank Farm before moving to higher-risk operations in the South Tank Farm. This approach allowed project personnel to become familiar with the tanks and waste, as well as the equipment, processes, procedures, and operations required to perform successful waste retrieval. By using an integrated approach to tank waste retrieval and tank waste management, the project was completed years ahead of the original baseline schedule, which resulted in avoiding millions of dollars in associated costs. This report is organized in two volumes. Volume 1 provides information on the various phases of the GAAT Remediation Project. It also describes the different types of equipment and how they were used. The emphasis of Volume 1 is on the description of the tank waste retrieval performance and the lessons learned during the GAAT Remediation Project. Volume 2 provides the appendixes for the report, which include the following information: (A) Background Information for the Gunite and Associated Tanks Operable Unit; (B) Annotated Bibliography; (C) Comprehensive Listing of the Sample Analysis Data from the GAAT Remediation Project; (D) GAAT Equipment Matrix; and (E

  19. Nuclear facility decommissioning and site remedial actions: A selected bibliography, volume 9

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Owen, P.T.; Knox, N.P.; Michelson, D.C.

    1988-09-01

    The 604 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the ninth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's remedial action programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilitiesmore » Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Subsections for sections 1, 2, 5, and 6 include: Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at (615) 576-0568 or FTS 626

  20. Notifications Dated October 2, 2014 Submitted by We Energies to Dispose of Polychlorinated Biphenyl Remediation Waste

    EPA Pesticide Factsheets

    Disposal Notifications Dated October 2, 2014 for We Energies and the Utility Solid Waste Group Members’ Risk-Based Approvals to Dispose of Polychlorinated Biphenyl Remediation Waste at the Waste Management Disposal Sites in Menomonee Falls and Franklin, WI

  1. Health and safety plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cofer, G.H.; Holt, V.L.; Roupe, G.W.

    1993-11-01

    This health and safety plan (HASP) was developed by the members of the Measurement Applications and Development Group of the Health Science Research Division at the Oak Ridge National Laboratory (ORNL). This plan was prepared to ensure that health and safety related items for the Waste Area Grouping (WAG) 2 Remedial Investigation (RI)/Feasibility Study and Site Investigation projects conform with the requirements of 29 CFR 1910.120 (April 18, 1992). The RI Plan calls for the characterization, monitoring, risk assessment, and identification of remedial needs and alternatives that have been structured and staged with short-term and long-term objectives. In early FYmore » 1992, the WAG 2 RI was integrated with the ORNL Environmental Restoration (ER) Site Investigations program in order to achieve the complimentary objectives of the projects more effectively by providing an integrated basis of support. The combined effort was named the WAG 2 Remedial Investigation and Site Investigations Program (WAG 2 RI&SI). The Site Investigation activities are a series of monitoring efforts and directed investigations that support other ER activities by providing information about (1) watershed hydrogeology; (2) contaminants, pathways, and fluxes for groundwater at ORNL; (3) shallow subsurface areas that can act as secondary sources of contaminants; and (4) biological populations and contaminants in biota, in addition to other support and coordination activities.« less

  2. 20 CFR 356.2 - Program Fraud Civil Remedies Act of 1986.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 1 2010-04-01 2010-04-01 false Program Fraud Civil Remedies Act of 1986. 356.2 Section 356.2 Employees' Benefits RAILROAD RETIREMENT BOARD ADMINISTRATIVE REMEDIES FOR FRAUDULENT CLAIMS OR STATEMENTS CIVIL MONETARY PENALTY INFLATION ADJUSTMENT § 356.2 Program Fraud Civil Remedies Act...

  3. REMEDIATION TECHNOLOGY EVALUATION AT THE GILT EDGE MINE, SOUTH DAKOTA

    EPA Science Inventory

    This document reports the findings of the Mine Waste Technology Program's Activity III, Project 29,The Remediation Technology Evaluation Project at the Gilt Edge Mine, S.D. This project consisted of evaluating three emerging acidic waste rock stabilization technologies and compar...

  4. Florida state information handbook: formerly utilized sites remedial action program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This volume is one of a series produced under contract with DOE, Office of Nuclear Waste Management, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the federal and state levels, the pertinent programs they administer, each affected state legislature, and current federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Florida. It contains a description ofmore » the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.« less

  5. REMEDIAL ACTION, TREATMENT AND DISPOSAL OF HAZARDOUS WASTE: PROCEEDINGS OF THE SIXTEENTH ANNUAL HAZARDOUS WASTE RESEARCH SYMPOSIUM

    EPA Science Inventory

    The Sixteenth Annual Research Symposium on Remedial Action, Treatment and Disposal of Hazardous Waste was held in Cincinnati, Ohio, April 3-5, 1990. he purpose of this Symposium was to present the latest significant research findings from ongoing and recently completed projects f...

  6. Fall Protection Procedures for Sealing Bulk Waste Shipments by Rail Cars at Formerly Utilized Sites Remedial Action Program (FUSRAP) Sites - 13509

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boyle, J.D.; Fort, E. Joseph; Lorenz, William

    2013-07-01

    Rail-cars loaded with radioactive materials must be closed and fastened to comply with United States Department of Transportation (DOT) requirements before they shipped. Securing waste shipments in a manner that meets these regulations typically results in the use of a sealable rail-car liner. Workers accessing the tops of the 2.74 m high rail-cars to seal and inspect liners for compliance prior to shipment may be exposed to a fall hazard. Relatively recent revisions to the Fall Protection requirements in the Safety and Health Requirements Manual (EM385-1-1, U.S. Army Corps of Engineers) have necessitated modifications to the fall protection systems previouslymore » employed for rail-car loading at Formerly Utilized Sites Remedial Action Program (FUSRAP) sites. In response these projects have developed site-specific procedures to protect workers and maintain compliance with the improved fall protection regulations. (authors)« less

  7. Carbon-Based Functional Materials Derived from Waste for Water Remediation and Energy Storage.

    PubMed

    Ma, Qinglang; Yu, Yifu; Sindoro, Melinda; Fane, Anthony G; Wang, Rong; Zhang, Hua

    2017-04-01

    Carbon-based functional materials hold the key for solving global challenges in the areas of water scarcity and the energy crisis. Although carbon nanotubes (CNTs) and graphene have shown promising results in various fields of application, their high preparation cost and low production yield still dramatically hinder their wide practical applications. Therefore, there is an urgent call for preparing carbon-based functional materials from low-cost, abundant, and sustainable sources. Recent innovative strategies have been developed to convert various waste materials into valuable carbon-based functional materials. These waste-derived carbon-based functional materials have shown great potential in many applications, especially as sorbents for water remediation and electrodes for energy storage. Here, the research progress in the preparation of waste-derived carbon-based functional materials is summarized, along with their applications in water remediation and energy storage; challenges and future research directions in this emerging research field are also discussed. © 2017 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  8. 2016 Los Alamos National Laboratory Hazardous Waste Minimization Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Salzman, Sonja L.; English, Charles Joe

    Waste minimization and pollution prevention are goals within the operating procedures of Los Alamos National Security, LLC (LANS). The US Department of Energy (DOE), inclusive of the National Nuclear Security Administration (NNSA) and the Office of Environmental Management, and LANS are required to submit an annual hazardous waste minimization report to the New Mexico Environment Department (NMED) in accordance with the Los Alamos National Laboratory (LANL or the Laboratory) Hazardous Waste Facility Permit. The report was prepared pursuant to the requirements of Section 2.9 of the LANL Hazardous Waste Facility Permit. This report describes the hazardous waste minimization program, whichmore » is a component of the overall Pollution Prevention (P2) Program, administered by the Environmental Stewardship Group (EPC-ES). This report also supports the waste minimization and P2 goals of the Associate Directorate of Environmental Management (ADEM) organizations that are responsible for implementing remediation activities and describes its programs to incorporate waste reduction practices into remediation activities and procedures. This report includes data for all waste shipped offsite from LANL during fiscal year (FY) 2016 (October 1, 2015 – September 30, 2016). LANS was active during FY2016 in waste minimization and P2 efforts. Multiple projects were funded that specifically related to reduction of hazardous waste. In FY2016, there was no hazardous, mixed-transuranic (MTRU), or mixed low-level (MLLW) remediation waste shipped offsite from the Laboratory. More non-remediation hazardous waste and MLLW was shipped offsite from the Laboratory in FY2016 compared to FY2015. Non-remediation MTRU waste was not shipped offsite during FY2016. These accomplishments and analysis of the waste streams are discussed in much more detail within this report.« less

  9. 32 CFR 516.68 - Program Fraud Civil Remedies Act (PFCRA).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 3 2011-07-01 2009-07-01 true Program Fraud Civil Remedies Act (PFCRA). 516.68 Section 516.68 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY AID OF CIVIL AUTHORITIES AND PUBLIC RELATIONS LITIGATION Remedies in Procurement Fraud and Corruption § 516.68 Program...

  10. UNITED STATES AND GERMAN BILATERAL AGREEMENT ON REMEDIATION OF HAZARDOUS WASTE SITES

    EPA Science Inventory

    The U.S. Environmental Protection Agency (EPA) and Germany's Bundesministerium fur Forschung und Technologie (BMFT) are involved in a collaborative effort called the U.S. and German Bilateral Agreement on Remediation of Hazardous Waste Sites. he purpose of this interim status rep...

  11. PRELIMINARY ASSESSMENT OF WORKER AND AMBIENT AIR EXPOSURES DURING SOIL REMEDIATION TECHNOLOGY DEMONSTRATIONS

    EPA Science Inventory

    Hazardous waste site remediation workers or neighboring residents may be exposed to particulates during the remediation of lead contaminated soil sites. An industrial hygiene survey and air monitoring program for both lead and dust were performed during initial soil sampling acti...

  12. The Experiences and Effect of Two Post-Secondary Mathematics Remediation Programs

    ERIC Educational Resources Information Center

    Izard, Angie D.

    2010-01-01

    The purpose of this study was to describe the experience and effect of two post-secondary mathematics remediation programs at a Midwest university. The two mathematics remediation programs were provided as part of a summer bridge program designed to assist entering freshmen students who demonstrated low mathematics proficiency levels based on…

  13. Green and sustainable remediation practices in Federal agency cleanup programs

    DOE PAGES

    Martino, Louis E.; Dona, Carol L.; Dicerbo, Jerry; ...

    2016-10-27

    Federal agencies manage hazardous waste sites under the assumption that environmental restoration will improve the environment by returning contaminated groundwater to beneficial use, removing waste residuals from a site, treating discharges to surface water, and reducing overall risks to human health and the environment. However, the associated time-consuming and expensive operations, extensive performance monitoring, and post-closure care can lead to unanticipated environmental impacts due to both the technological nature of these cleanup activities and the related protracted timelines. These life-cycle impacts can and should be included in the evaluation of remedial alternatives. Increasingly, Federal agencies are considering these life-cycle impacts—more » variously referred to as ‘‘environmental footprint analysis,’’ ‘‘sustainable remediation,’’ ‘‘green remediation,’’ ‘‘greener remediation,’’ and ‘‘green and sustainable remediation’’— when evaluating environmental restoration approaches. For the purposes of this paper, this concept will be referred to as ‘‘green and sustainable remediation’’ (GSR), with application of GSR assumed to take place across the cleanup life cycle, from the investigation phase through site closeout. This paper will discuss the history of GSR, what GSR is, who is implementing GSR, and GSR metrics. Finally, the paper will also discuss two approaches to GSR, using case studies to understand and implement it; the first will be a qualitative approach, and the second a more detailed quantitative approach« less

  14. Green and sustainable remediation practices in Federal agency cleanup programs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Martino, Louis E.; Dona, Carol L.; Dicerbo, Jerry

    Federal agencies manage hazardous waste sites under the assumption that environmental restoration will improve the environment by returning contaminated groundwater to beneficial use, removing waste residuals from a site, treating discharges to surface water, and reducing overall risks to human health and the environment. However, the associated time-consuming and expensive operations, extensive performance monitoring, and post-closure care can lead to unanticipated environmental impacts due to both the technological nature of these cleanup activities and the related protracted timelines. These life-cycle impacts can and should be included in the evaluation of remedial alternatives. Increasingly, Federal agencies are considering these life-cycle impacts—more » variously referred to as ‘‘environmental footprint analysis,’’ ‘‘sustainable remediation,’’ ‘‘green remediation,’’ ‘‘greener remediation,’’ and ‘‘green and sustainable remediation’’— when evaluating environmental restoration approaches. For the purposes of this paper, this concept will be referred to as ‘‘green and sustainable remediation’’ (GSR), with application of GSR assumed to take place across the cleanup life cycle, from the investigation phase through site closeout. This paper will discuss the history of GSR, what GSR is, who is implementing GSR, and GSR metrics. Finally, the paper will also discuss two approaches to GSR, using case studies to understand and implement it; the first will be a qualitative approach, and the second a more detailed quantitative approach« less

  15. Factors associated with clinical skill remediation in dental hygiene education programs.

    PubMed

    Wood, Donna F; Mitchell, Tanya Villalpando; Holt, Lorie A; Branson, Bonnie G

    2014-02-01

    The purpose of this study was to examine the challenges related to formal clinical remediation in dental hygiene programs, which include timing of student identification, policy development, and the issues of methodology and scheduling. A 23 item investigator-designed survey was electronically distributed to all 303 U.S. entry-level dental hygiene program directors. This questionnaire included 23 forced-choice questions with the options to add comments to 8 of the questions. A total of 111 surveys were returned yielding a response rate of 36%. Descriptive statistics and Chi-square analyses were utilized to analyze relationships between responses and the degree earned from the dental hygiene program. All schools reported having a remediation policy; however, 13.6% of the respondents revealed this information was not readily available to students. The majority of respondents (67.8%) reported identifying students with clinical deficiencies in the preclinical semester, and 15.5% identified students in the second year, second clinical semester. Instrumentation technique was identified as the area in greatest need of remediation (81%), followed by critical thinking and problem solving skills (12%). Coordination of faculty and student schedules to conduct remediation was identified as one of the greatest challenges by respondents (25.2%). Results of this study suggest that challenges exist with the process of remediation. Some of these challenges include involving the student in remedial plan development, the academic consequences associated with remediation and scheduling time and space for remedial activities. These findings indicate that respondents are well aware of the need for remediation policies in dental hygiene programs. The point in time varies when students in need of remediation are identified. Therefore, further research needs to be conducted to determine the reasons for this difference. Some reasons may include inability to grasp the foundational skills and

  16. 32 CFR 516.68 - Program Fraud Civil Remedies Act (PFCRA).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... AUTHORITIES AND PUBLIC RELATIONS LITIGATION Remedies in Procurement Fraud and Corruption § 516.68 Program Fraud Civil Remedies Act (PFCRA). (a) PFCRA was enacted on 21 October 1986 (Public Law 99-509) and...

  17. Nuclear waste management. Semiannual progress report, October 1982-March 1983

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chikalla, T.D.; Powell, J.A.

    1983-06-01

    This document is one of a series of technical progress reports designed to report radioactive waste management programs at the Pacific Northwest Laboratory. Accomplishments in the following programs are reported: waste stabilization; Materials Characterization Center; waste isolation; low-level waste management; remedial action; and supporting studies.

  18. Innovative vitrification for soil remediation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jetta, N.W.; Patten, J.S.; Hart, J.G.

    1995-12-01

    The objective of this DOE demonstration program is to validate the performance and operation of the Vortec Cyclone Melting System (CMS{trademark}) for the processing of LLW contaminated soils found at DOE sites. This DOE vitrification demonstration project has successfully progressed through the first two phases. Phase 1 consisted of pilot scale testing with surrogate wastes and the conceptual design of a process plant operating at a generic DOE site. The objective of Phase 2, which is scheduled to be completed the end of FY 95, is to develop a definitive process plant design for the treatment of wastes at amore » specific DOE facility. During Phase 2, a site specific design was developed for the processing of LLW soils and muds containing TSCA organics and RCRA metal contaminants. Phase 3 will consist of a full scale demonstration at the DOE gaseous diffusion plant located in Paducah, KY. Several DOE sites were evaluated for potential application of the technology. Paducah was selected for the demonstration program because of their urgent waste remediation needs as well as their strong management and cost sharing financial support for the project. During Phase 2, the basic nitrification process design was modified to meet the specific needs of the new waste streams available at Paducah. The system design developed for Paducah has significantly enhanced the processing capabilities of the Vortec vitrification process. The overall system design now includes the capability to shred entire drums and drum packs containing mud, concrete, plastics and PCB`s as well as bulk waste materials. This enhanced processing capability will substantially expand the total DOE waste remediation applications of the technology.« less

  19. Treatment Study Plan for Nitrate Salt Waste Remediation Revision 1.0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Juarez, Catherine L.; Funk, David John; Vigil-Holterman, Luciana R.

    2016-03-07

    The two stabilization treatment methods that are to be examined for their effectiveness in the treatment of both the unremediated and remediated nitrate salt wastes include (1) the addition of zeolite and (2) cementation. Zeolite addition is proposed based on the results of several studies and analyses that specifically examined the effectiveness of this process for deactivating nitrate salts. Cementation is also being assessed because of its prevalence as an immobilization method used for similar wastes at numerous facilities around the DOE complex, including at Los Alamos. The results of this Treatment Study Plan will be used to provide themore » basis for a Resource Conservation and Recovery Act (RCRA) permit modification request of the LANL Hazardous Waste Facility Permit for approval by the New Mexico Environment Department-Hazardous Waste Bureau (NMED-HWB) of the proposed treatment process and the associated facilities.« less

  20. Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-02-01

    In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE`s overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program.

  1. Nuclear facility decommissioning and site remedial actions. Volume 6. A selected bibliography

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Owen, P.T.; Michelson, D.C.; Knox, N.P.

    1985-09-01

    This bibliography of 683 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the sixth in a series of annual reports prepared for the US Department of Energy's Remedial Action Programs. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's remedial action program. Majormore » chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Facilities Contaminated with Natural Radioactivity; (5) Uranium Mill Tailings Remedial Action Program; (6) Grand Junction Remedial Action Program; (7) Uranium Mill Tailings Management; (8) Technical Measurements Center; and (9) General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 7 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate affiliation or by publication description.« less

  2. WAG 2 remedial investigation and site investigation site-specific work plan/health and safety checklist for the soil and sediment task. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Holt, V.L.; Burgoa, B.B.

    1993-12-01

    This document is a site-specific work plan/health and safety checklist (WP/HSC) for a task of the Waste Area Grouping 2 Remedial Investigation and Site Investigation (WAG 2 RI&SI). Title 29 CFR Part 1910.120 requires that a health and safety program plan that includes site- and task-specific information be completed to ensure conformance with health- and safety-related requirements. To meet this requirement, the health and safety program plan for each WAG 2 RI&SI field task must include (1) the general health and safety program plan for all WAG 2 RI&SI field activities and (2) a WP/HSC for that particular field task.more » These two components, along with all applicable referenced procedures, must be kept together at the work site and distributed to field personnel as required. The general health and safety program plan is the Health and Safety Plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee (ORNL/ER-169). The WP/HSCs are being issued as supplements to ORNL/ER-169.« less

  3. Field sampling and analysis plan for the remedial investigation of Waste Area Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boston, H.L.; Ashwood, T.L.; Borders, D.M.

    1992-02-01

    This field sampling and analysis (S & A) plan has been developed as part of the Department of Energy`s (DOE`s) remedial investigation (RI) of Waste Area Grouping (WAG) 2 at Oak Ridge National Laboratory (ORNL) located in Oak Ridge, Tennessee. The S & A plan has been written in support of the remedial investigation (RI) plan for WAG 2 (ORNL 1990). WAG 2 consists of White Oak Creek (WOC) and its tributaries downstream of the ORNL main plant area, White Oak Lake (WOL), White Oak Creek embayment (WOCE) on the Clinch River, and the associated floodplain and subsurface environment (Fig.more » 1.1). The WOC system is the surface drainage for the major ORNL WAGs and has been exposed to a diversity of contaminants from operations and waste disposal activities in the WOC watershed. WAG 2 acts as a conduit through which hydrologic fluxes carry contaminants from upgradient areas to the Clinch River. Water, sediment, soil, and biota in WAG 2 are contaminated and continue to receive contaminants from upgradient WAGs. This document describes the following: an overview of the RI plan, background information for the WAG 2 system, and objectives of the S & A plan; the scope and implementation of the first 2 years of effort of the S & A plan and includes recent information about contaminants of concern, organization of S & A activities, interactions with other programs, and quality assurance specific to the S & A activities; provides details of the field sampling plans for sediment, surface water, groundwater, and biota, respectively; and describes the sample tracking and records management plan.« less

  4. Developmental Versus Remedial: Does a Confusion of Terms Exist in Higher Education Reading Programs?

    ERIC Educational Resources Information Center

    Nist, Sherrie L.

    1985-01-01

    Examines the differences between remedial and developmental reading programs and their places in higher education. Finds a consistency among definitions of remedial reading but no clear consensus for developmental reading. Sees a clear delineation between remedial and developmental students. Offers guidelines for programs and instruction…

  5. 2013 Los Alamos National Laboratory Hazardous Waste Minimization Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Salzman, Sonja L.; English, Charles J.

    2015-08-24

    Waste minimization and pollution prevention are inherent goals within the operating procedures of Los Alamos National Security, LLC (LANS). The US Department of Energy (DOE) and LANS are required to submit an annual hazardous waste minimization report to the New Mexico Environment Department (NMED) in accordance with the Los Alamos National Laboratory (LANL or the Laboratory) Hazardous Waste Facility Permit. The report was prepared pursuant to the requirements of Section 2.9 of the LANL Hazardous Waste Facility Permit. This report describes the hazardous waste minimization program (a component of the overall Waste Minimization/Pollution Prevention [WMin/PP] Program) administered by the Environmentalmore » Stewardship Group (ENV-ES). This report also supports the waste minimization and pollution prevention goals of the Environmental Programs Directorate (EP) organizations that are responsible for implementing remediation activities and describes its programs to incorporate waste reduction practices into remediation activities and procedures. LANS was very successful in fiscal year (FY) 2013 (October 1-September 30) in WMin/PP efforts. Staff funded four projects specifically related to reduction of waste with hazardous constituents, and LANS won four national awards for pollution prevention efforts from the National Nuclear Security Administration (NNSA). In FY13, there was no hazardous, mixedtransuranic (MTRU), or mixed low-level (MLLW) remediation waste generated at the Laboratory. More hazardous waste, MTRU waste, and MLLW was generated in FY13 than in FY12, and the majority of the increase was related to MTRU processing or lab cleanouts. These accomplishments and analysis of the waste streams are discussed in much more detail within this report.« less

  6. Prioritization of remedial actions for radioactive waste burials in the Chernobyl exclusion zone

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Crossland, Ian

    2013-07-01

    Large volumes of radioactive waste were urgently buried in the Chernobyl Exclusion Zone (ChEZ) in the aftermath of the 1986 accident. Twenty-six years later, decisions must be taken about whether and how to remediate these sites. An attempt to resolve two key issues is described here: 1. How to assess the hazards posed by these facilities, recognizing that, for the foreseeable future, the Chernobyl Exclusion Zone will remain under institutional control? and 2. What standards to apply in deciding the extent of remediation? This paper presents an examination of the issues and proposes a simple decision-making process. (authors)

  7. Hazardous Waste Clean-Up Information (CLU-IN) On-line Characterization and Remediation Databases Fact Sheet

    EPA Pesticide Factsheets

    This fact sheet provides an overview of the 10 on-line characterization and remediation databases available on the Hazardous Waste Clean-Up Information (CLU-IN) website sponsored by the U.S. Environmental Protection Agency.

  8. 77 FR 57074 - Indirect Cost Rates for the Damage Assessment, Remediation, and Restoration Program for Fiscal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-17

    ... Damage Assessment, Remediation, and Restoration Program for Fiscal Year 2011 AGENCY: National Oceanic and..., Remediation, and Restoration Program for Fiscal Year 2011. SUMMARY: The National Oceanic and Atmospheric Administration's (NOAA's) Damage Assessment, Remediation, and Restoration Program (DARRP) is announcing new...

  9. What does remediation and probation status mean? A survey of emergency medicine residency program directors.

    PubMed

    Weizberg, Moshe; Smith, Jessica L; Murano, Tiffany; Silverberg, Mark; Santen, Sally A

    2015-01-01

    Emergency medicine (EM) residency program directors (PDs) nationwide place residents on remediation and probation. However, the Accreditation Council for Graduate Medical Education and the EM PDs have not defined these terms, and individual institutions must set guidelines defining a change in resident status from good standing to remediation or probation. The primary objective of this study was to determine if EM PDs follow a common process to guide actions when residents are placed on remediation and probation. An anonymous electronic survey was distributed to EM PDs via e-mail using SurveyMonkey to determine the current practice followed after residents are placed on remediation or probation. The survey queried four designations: informal remediation, formal remediation, informal probation, and formal probation. These designations were compared for deficits in the domains of medical knowledge (MK) and non-MK remediation. The survey asked what process for designation exists and what actions are triggered, specifically if documentation is placed in a resident's file, if the graduate medical education (GME) office is notified, if faculty are informed, or if resident privileges are limited. Descriptive data are reported. Eighty-one of 160 PDs responded. An official policy on remediation and/or probation was reported by 41 (50.6%) programs. The status of informal remediation is used by 73 (90.1%), 80 (98.8%) have formal remediation, 40 (49.4%) have informal probation, and 79 (97.5%) have formal probation. There was great variation among PDs in the management and definition of remediation and probation. Between 81 and 86% of programs place an official letter into the resident's file regarding formal remediation and probation. However, only about 50% notify the GME office when a resident is placed on formal remediation. There were no statistical differences between MK and non-MK remediation practices. There is significant variation among EM programs regarding the

  10. Federal government information handbook: formerly utilized sites remedial action program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the Federal Government. It contains a summary of the organizationmore » and responsibilities of agencies within the executive branch of the Federal government which may be relevant to FUSRAP activities; a brief summary of relevant Federal statutes and regulations; a description of the structure of the US Congress, identification of the officers, relevant committees and committee chairmen; a description of the Federal legislative process; a summary of legislation enacted and considered in the recently-adjourned 96th Congress; a description of the Federal budgetary process; a summary of the Carter Administration's comprehensive radioactive waste management program; and excerpts from the text of relevant federal statutes and regulations.« less

  11. Skatole remediation potential of Rhodopseudomonas palustris WKU-KDNS3 isolated from an animal waste lagoon.

    PubMed

    Sharma, N; Doerner, K C; Alok, P C; Choudhary, M

    2015-03-01

    Skatole (3MI) is a major contributor to the malodor emission resulting from ruminant and human faeces. The remediation of malodor has been a major challenge for the animal production industry. In this investigation, a pure culture of purple nonsulphur bacterium capable of degrading 3MI was isolated from a swine waste lagoon using an enrichment technique and identified as Rhodopseudomonas palustris WKU-KDNS3 based on 16S rRNA analysis and UV-visible spectroscopy. The cell structure of the organism was confirmed by transmission electron microscopy. Growth profile and 3MI removal pattern were determined using media supplemented with 0.1 μmol 3MI under short-term and long-term aerobic growth conditions. The organism grew on 3MI media as luxuriantly as control (without 3MI). Growth of R. palustris WKU-KDNS3 demonstrated a significant reduction in the level of 3MI (>48%) in 72 h. The level of 3MI dropped further by >93% of the total concentration present in the medium in 21 days. Skatole remediation potential of R. palustris WKU-KDNS3 can be judiciously utilized in various animal and industrial waste treatment systems. Odour pollution is a serious environmental problem, particularly in the agriculture industry, and technologies based on chemical remediation are less effective and cost prohibitive. In this study, the newly isolated Rhodopseudomonas palustris strain WKU-KDNS3 causes biodegradation of 3-methylindole (skatole), which is one of the most offensive odorants present in wastewater lagoons. Aerobic degradation of this widely spread aromatic pollutant by Rhodopseudomonas strain is a significant finding that enhances the present understanding about metabolic versatility of purple photosynthetic nonsulphur bacteria. The remediation potential of R. palustris WKU-KDNS3 can also be gainfully utilized in various waste treatment facilities. © 2014 The Society for Applied Microbiology.

  12. Afternoon Remedial and Enrichment Program, Buffalo, New York. Elementary Program in Compensatory Education, 2.

    ERIC Educational Resources Information Center

    American Institutes for Research in the Behavioral Sciences, Palo Alto, CA.

    This afternoon remedial and enrichment program was offered to inner-city low income children (grades 3-8). About 75 percent of the children were black, 20 percent white and 5 percent Puerto Rican. Remedial instruction was offered in reading and mathematics. Average class size was six pupils; these small groups allowed for better diagnosis of needs…

  13. Nuclear facility decommissioning and site remedial actions: A selected bibliography: Volume 8

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Owen, P.T.; Michelson, D.C.; Knox, N.P.

    1987-09-01

    The 553 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eighth in a series of reports. Foreign and domestic literature of all types - technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of energy's remedial action program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Facilities Contaminated with Naturally Occurring Radionuclides, Uranium Mill Tailings Remedial Action Program,more » Uranium Mill Tailings Management, Technical Measurements Center, and General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. The appendix contains a list of frequently used acronyms and abbreviations.« less

  14. CONTROL TECHNOLOGIES FOR REMEDIATION OF CONTAMINATED SOIL AND WASTE DEPOSITS AT SUPERFUND LEAD BATTERY SITES

    EPA Science Inventory

    This paper primarily addresses remediation of contaminated soils and waste deposits at defunct lead-acid battery recycling sites (LBRS) via immobilization and separation processes. efunct LBRS is a facility at which battery breaking, secondary lead smelting, or both operations we...

  15. 75 FR 35720 - Massachusetts: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-23

    ...: Robin Biscaia, RCRA Waste Management Section, Office of Site Remediation and Restoration (OSRR 07-1... Restoration and Remediation (OSRR 07-1), EPA New England--Region 1, 5 Post Office Square, Suite 100, Boston... Management Section, Office of Site Remediation and Restoration (OSRR 07-1), EPA New England--Region 1, 5 Post...

  16. Nuclear facility decommissioning and site remedial actions: a selected bibliography

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Owen, P.T.; Knox, N.P.; Fielden, J.M.

    This bibliography contains 693 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. Foreign, as well as domestic, literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Uraniummore » Mill Tailings Remedial Action Program, Grand Junction Remedial Action Program, and Uranium Mill Tailings Management. Chapter sections for chapters 1 and 2 include: Design, Planning, and Regulations; Site Surveys; Decontamination Studies; Dismantlement and Demolition; Land Decontamination and Reclamation; Waste Disposal; and General Studies. The references within each chapter are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for (1) author; (2) corporate affiliation; (3) title; (4) publication description; (5) geographic location; and (6) keywords. An appendix of 202 bibliographic references without abstracts or indexes has been included in this bibliography. This appendix represents literature identified but not abstracted due to time constraints.« less

  17. 76 FR 61089 - Indirect Cost Rates for the Damage Assessment, Remediation, and Restoration Program for Fiscal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-03

    ... Damage Assessment, Remediation, and Restoration Program for Fiscal Years 2009 and 2010 AGENCY: National... Damage Assessment, Remediation, and Restoration Program for Fiscal Years 2009 and 2010. SUMMARY: The National Oceanic and Atmospheric Administration's (NOAA's) Damage Assessment, Remediation, and Restoration...

  18. Electrokinetic remediation of plutonium-contaminated nuclear site wastes: results from a pilot-scale on-site trial.

    PubMed

    Agnew, Kieran; Cundy, Andrew B; Hopkinson, Laurence; Croudace, Ian W; Warwick, Phillip E; Purdie, Philip

    2011-02-28

    This paper examines the field-scale application of a novel low-energy electrokinetic technique for the remediation of plutonium-contaminated nuclear site soils, using soil wastes from the Atomic Weapons Establishment (AWE) Aldermaston site, Berkshire, UK as a test medium. Soils and sediments with varying composition, contaminated with Pu through historical site operations, were electrokinetically treated at laboratory-scale with and without various soil pre-conditioning agents. Results from these bench-scale trials were used to inform a larger on-site remediation trial, using an adapted containment pack with battery power supply. 2.4 m(3) (ca. 4t onnes) of Pu-contaminated soil was treated for 60 days at a power consumption of 33 kWh/m(3), and then destructively sampled. Radiochemical data indicate mobilisation of Pu in the treated soil, and migration (probably as a negatively charged Pu-citrate complex) towards the anodic compartment of the treatment cell. Soil in the cathodic zone of the treatment unit was remediated to a level below free-release disposal thresholds (1.7 Bq/g, or <0.4 Bq/g above background activities). The data show the potential of this method as a low-cost, on-site tool for remediation of radioactively contaminated soils and wastes which can be operated remotely on working sites, with minimal disruption to site infrastructure or operations. Copyright © 2010 Elsevier B.V. All rights reserved.

  19. The Bama Bookworm Program: Motivating Remedial Readers to Read at Home with Their Parents.

    ERIC Educational Resources Information Center

    Brown, David; Moore, Linda

    1992-01-01

    The Bama Bookworm Program, developed by a university remedial reading summer school program, encourages parents of remedial readers to listen to their children read and to ask comprehension questions four nights a week for a month. The program provides incentives (pizzas and t-shirts) and was enthusiastically received by parents and children. (DB)

  20. 78 FR 53425 - Indirect Cost Rates for the Damage Assessment, Remediation, and Restoration Program for Fiscal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-29

    ... DEPARTMENT OF COMMERCE Indirect Cost Rates for the Damage Assessment, Remediation, and Restoration.... ACTION: Notice of Indirect Cost Rates for the Damage Assessment, Remediation, and Restoration Program for... Assessment, Remediation, and Restoration Program (DARRP) is announcing new indirect cost rates on the...

  1. Summary Report of Comprehensive Laboratory Testing to Establish the Effectiveness of Proposed Treatment Methods for Unremediated and Remediated Nitrate Salt Waste Streams

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anast, Kurt Roy; Funk, David John; Hargis, Kenneth Marshall

    The inadvertent creation of transuranic waste carrying hazardous waste codes D001 and D002 requires the treatment of the material to eliminate the hazardous characteristics and allow its eventual shipment and disposal at the Waste Isolation Pilot Plant (WIPP). This report documents the effectiveness of two treatment methods proposed to stabilize both the unremediated and remediated nitrate salt waste streams (UNS and RNS, respectively) at Los Alamos National Laboratory (LANL). The two technologies include the addition of zeolite (with and without the addition of water as a processing aid) and cementation. Surrogates were developed to evaluate both the solid and liquidmore » fractions expected from parent waste containers, and both the solid and liquid fractions were tested. Both technologies are shown to be effective at eliminating the characteristic of ignitability (D001), and the addition of zeolite was determined to be effective at eliminating corrosivity (D002), with the preferred option1 of adding zeolite currently planned for implementation at LANL’s Waste Characterization, Reduction, and Repackaging Facility (WCRRF). The course of this work verified the need to evaluate and demonstrate the effectiveness of the proposed remedy for debris material, if required. The evaluation determined that WypAlls, cheesecloth, and Celotex absorbed with saturated nitrate salt solutions exhibit the ignitability characteristic (all other expected debris is not classified as ignitable). Finally, liquid surrogates containing saturated nitrate salts did not exhibit the characteristic of ignitability in their pure form (those neutralized with Kolorsafe and mixed with sWheat did exhibit D001). Sensitivity testing and an analysis were conducted to evaluate the waste form for reactivity. Tests included subjecting surrogate material to mechanical impact, friction, electrostatic discharge and thermal insults. The testing confirmed that the waste does not exhibit the characteristic

  2. Role of biochar on composting of organic wastes and remediation of contaminated soils-a review.

    PubMed

    Wu, Shaohua; He, Huijun; Inthapanya, Xayanto; Yang, Chunping; Lu, Li; Zeng, Guangming; Han, Zhenfeng

    2017-07-01

    Biochar is produced by pyrolysis of biomass residues under limited oxygen conditions. In recent years, biochar as an amendment has received increasing attention on composting and soil remediation, due to its unique properties such as chemical recalcitrance, high porosity and sorption capacity, and large surface area. This paper provides an overview on the impact of biochar on the chemical characteristics (greenhouse gas emissions, nitrogen loss, decomposition and humification of organic matter) and microbial community structure during composting of organic wastes. This review also discusses the use of biochar for remediation of soils contaminated with organic pollutants and heavy metals as well as related mechanisms. Besides its aging, the effects of biochar on the environment fate and efficacy of pesticides deserve special attention. Moreover, the combined application of biochar and compost affects synergistically on soil remediation and plant growth. Future research needs are identified to ensure a wide application of biochar in composting and soil remediation. Graphical abstract ᅟ.

  3. Do Supplemental Remedial Reading Programs Address the Motivational Issues of Struggling Readers? An Analysis of Five Popular Programs.

    PubMed

    Quirk, Matthew P; Schwanenflugel, Paula J

    2004-04-01

    Five popular, but distinctly different, remedial reading programs were reviewed regarding the potential to motivate children to read. It is argued that current remedial reading program designs and research on program effectiveness ignore the impact that motivation has on struggling readers. In addition, we develop a theory of reading motivation specific to struggling readers that highlights motivational constructs we feel are important to the improvement of reading skill for this population of students. The three aspects of reading motivation most relevant to the instruction of remedial readers include: (a) improving reading self-efficacy; (b) making internal and controllable outcome attributions for successes and failures associated with reading; and (c) establishing personally relevant value in becoming a better reader. We conclude that, while most programs address some motivational issues and other issues not at all, most programs could make minor modifications that would greatly enhance their motivational impact.

  4. Nuclear facility decommissioning and site remedial actions: a selected bibliography. Volume 5

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Owen, P.T.; Knox, N.P.; Chilton, B.D.

    1984-09-01

    This bibliography of 756 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the fifth in a series of annual reports prepared for the US Department of Energy, Division of Remedial Action Projects. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department ofmore » Energy's Remedial Action Program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Uranium Mill Tailings Remedial Action Program; (5) Grand Junction Remedial Action Program; (6) Uranium Mill Tailings Management; and (7) Technical Measurements Center. Chapter sections for chapters 1, 2, 4, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for the categories of author, corporate affiliation, title, publication description, geographic location, and keywords. The Appendix contains a list of frequently used acronyms.« less

  5. Data Management Plan and Functional System Design for the Information Management System of the Clinch River Remedial Investigation and Waste Area Grouping 6

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ball, T.; Brandt, C.; Calfee, J.

    1994-03-01

    The Data Management Plan and Functional System Design supports the Clinch River Remedial Investigation (CRRI) and Waste Area Grouping (WAG) 6 Environmental Monitoring Program. The objective of the Data Management Plan and Functional System Design is to provide organization, integrity, security, traceability, and consistency of the data generated during the CRRI and WAG 6 projects. Proper organization will ensure that the data are consistent with the procedures and requirements of the projects. The Information Management Groups (IMGs) for these two programs face similar challenges and share many common objectives. By teaming together, the IMGs have expedited the development and implementationmore » of a common information management strategy that benefits each program.« less

  6. Tank waste remediation system tank waste retrieval risk management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Klimper, S.C.

    1997-11-07

    This Risk Management Plan defines the approach to be taken to manage programmatic risks in the TWRS Tank Waste Retrieval program. It provides specific instructions applicable to TWR, and is used to supplement the guidance given by the TWRS Risk Management procedure.

  7. The Gunite and Associated Tanks Remediation Project Tank Waste Retrieval Performance and Lessons Learned, vol. 2 [of 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lewis, BE

    2003-10-07

    The Gunite and Associated Tanks (GAAT) Remediation Project was the first of its kind performed in the United States. Robotics and remotely operated equipment were used to successfully transfer almost 94,000 gal of remote-handled transuranic sludge containing over 81,000 Ci of radioactive contamination from nine large underground storage tanks at the Oak Ridge National Laboratory (ORNL). The sludge was transferred with over 439,000 gal of radioactive waste supernatant and {approx}420,500 gal of fresh water that was used in sluicing operations. The GAATs are located in a high-traffic area of ORNL near a main thoroughfare. Volume 1 provides information on themore » various phases of the project and describes the types of equipment used. Volume 1 also discusses the tank waste retrieval performance and the lessons learned during the remediation effort. Volume 2 consists of the following appendixes, which are referenced in Vol. 1: A--Background Information for the Gunite and Associated Tanks Operable Unit; B--Annotated Bibliography; C--GAAT Equipment Matrix; D--Comprehensive Listing of the Sample Analysis Data from the GAAT Remediation Project; and E--Vendor List for the GAAT Remediation Project. The remediation of the GAATs was completed {approx}5.5 years ahead of schedule and {approx}$120,435K below the cost estimated in the Remedial Investigation/Feasibility Study for the project. These schedule and cost savings were a direct result of the selection and use of state-of-the-art technologies and the dedication and drive of the engineers, technicians, managers, craft workers, and support personnel that made up the GAAT Remediation Project Team.« less

  8. Application of Plasma Arcs to the to the Remediation of Shipboard Waste(Supported by ONR and NSWC.)

    NASA Astrophysics Data System (ADS)

    Giuliani, John L.

    1996-10-01

    The Naval Research Laboratory (B. Sartwell, (Chemistry Division NRL); J. Apruzese, (Plasma Physics Division NRL); S. Peterson, D. Counts, (Geo-Centers Inc.),and Q. Han (U. Minn.)) (NRL) is investigating the application of plasma arc technology for the on-board remediation of waste material generated by sea faring ships. A 150kW DC arc torch within a 1 meter diameter chamber has been used for the pyrolysis of liquid and solid material which simulate the waste stream from a naval ship. A general discussion of the materials treated and the associated problems arising from their pyrolysis in a plasma torch will be presented. The greatest challenge for a shipboard plasma remediation, including any exhaust gas treatment, is the overall size of the system imposed by the limited confines of a ship. Connected with this issue are choices of the arc configuration: transfered vs non-transfered; and the feed stock gas: reducing vs oxidizing. The research component of NRL's program is to characterize the gaseous by-products, the remnant slag, and the plasma arc through systematic experiments, as well as to model the plasma dynamics and chemistry within the chamber. The environment within the chamber is primarily defined by several temperature measurements. Two color pyrometry is used to determine the molten slag temperature ( ~2200 degK) and a suite of thermocouples within the chamber indicate a slighter cooler gas phase temperature. Synthetic spectra were generated from radiation transport calculations and compared with optical emission spectroscopy to map the gas temperature around the plasma arc itself ( ~ 5000 degK). Spectroscopy offers the potential of a non-invasive diagnostic to eventually be used for on-line process control, a necessary feature for an operating system due to the heterogeneous waste stream. Other studies will be described including the addition of O2 through a ring to achieve combustion of hydrocarbon wastes, residual gas analysis of the exhaust for

  9. Tribal Waste Management Program

    EPA Pesticide Factsheets

    The EPA’s Tribal Waste Management Program encourages environmentally sound waste management practices that promote resource conservation through recycling, recovery, reduction, clean up, and elimination of waste.

  10. Case Study of Urban Residential Remediation and Restoration in Port Hope, Canada - 13250

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Geddes, Brian; DeJong, John; Owen, Michael

    2013-07-01

    The Canadian Municipality of Port Hope, Ontario, is located some 100 km east of Toronto and has been the location of radium and/or uranium refining since the 1930's. Historically, these activities involved materials containing radium-226, uranium, arsenic and other contaminants generated by the refining process. In years past, properties and sites in Port Hope became contaminated from spillage during transportation, unrecorded, un-monitored or unauthorized diversion of contaminated fill and materials, wind and water erosion and spread from residue storage areas. Residential properties in Port Hope impacted by radioactive materials are being addressed by the Canadian federal government under programs administeredmore » by the Low-Level Radioactive Waste Management Office (LLRWMO) and the Port Hope Area Initiative Management Office (PHAIMO). Issues that currently arise at these properties are addressed by the LLRWMO's Interim Waste Management Program (IWM). In the future, these sites will be included in the PHAIMO's Small Scale Sites (SSS) remedial program. The LLRWMO has recently completed a remediation and restoration program at a residential property in Port Hope that has provided learnings that will be applicable to the PHAIMO's upcoming SSS remedial effort. The work scope at this property involved remediating contaminated refinery materials that had been re-used in the original construction of the residence. Following removal of the contaminated materials, the property was restored for continued residential use. This kind of property represents a relatively small, but potentially challenging subset of the portfolio of sites that will eventually be addressed by the SSS program. (authors)« less

  11. CONTROL TECHNOLOGIES FOR REMEDIATION OF CONTAMINATED SOIL AND WASTE DEPOSITS AT SUPERFUND LEAD BATTERY RECYCLING SITES

    EPA Science Inventory

    This paper primarily addresses remediation of contaminated soils and waste deposits at defunct lead-acid battery recycling sites (LBRS) via immobilization and separation processes. A defunct LBRS is a facility at which battery breaking, secondary lead smelting, or both operations...

  12. 32 CFR 634.10 - Remedial driver training programs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Remedial driver training programs. 634.10 Section 634.10 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW... individual driving history or incidents requiring additional training. The curriculum should provide...

  13. 32 CFR 634.10 - Remedial driver training programs.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 4 2012-07-01 2011-07-01 true Remedial driver training programs. 634.10 Section 634.10 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW... individual driving history or incidents requiring additional training. The curriculum should provide...

  14. 32 CFR 634.10 - Remedial driver training programs.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 4 2011-07-01 2011-07-01 false Remedial driver training programs. 634.10 Section 634.10 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW... individual driving history or incidents requiring additional training. The curriculum should provide...

  15. 32 CFR 634.10 - Remedial driver training programs.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 4 2013-07-01 2013-07-01 false Remedial driver training programs. 634.10 Section 634.10 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW... individual driving history or incidents requiring additional training. The curriculum should provide...

  16. 32 CFR 634.10 - Remedial driver training programs.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 4 2014-07-01 2013-07-01 true Remedial driver training programs. 634.10 Section 634.10 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW... individual driving history or incidents requiring additional training. The curriculum should provide...

  17. Expedited Remedial Action Program (SB 923): A California Brownfields initiative

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cambridge, M.; Wolfenden, A.K.

    California`s Expedited Remedial Action Program (ERAP) created a comprehensive program that promotes an equitable and expedited approach for redevelopment of properties contaminated with hazardous substances. This bill embodies an emerging trend in environmental policy that permits flexibility, cooperation and creativity without compromising protection to public health or the environment. Within the California Environmental Protection Agency, the Department of Toxic Substances Control (DTSC) is promoting a number of programs to facilitate the restoration of contaminated properties as part of its Brownfields initiative. ERAP represents a potentially more efficient process to remediate sites by minimizing economic risks through a clearly identified liabilitymore » scheme, indemnifying future owners through a covenant not to sue, and providing risk based cleanups that are based on the permanent use of the site.« less

  18. Characterization and remediation of a mixed waste-contaminated site at Kirtland Air Force Base, New Mexico

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnston, J.W.; Thacker, M.S.; DeWitt, C.B.

    In the area of environmental restoration, one of the most challenging problems is the task of remediating mixed waste-contaminated sites. This paper discusses a successful Interim Corrective Measure (ICM) performed at a mixed waste-contaminated site on Kirtland Air Force Base (AFB) in Albuquerque, New Mexico. The site, known as RW-68, Cratering Area and Radium Dump/Slag Piles, was used during the late 1940s and early 1950s for the destruction and incineration of captured World War II aircraft. It contained 19 slag piles totaling approximately 150 tons of slag, ash, refractory brick, and metal debris. The piles were contaminated with radium-226 andmore » RCRA-characteristic levels of heavy metals. Therefore, the piles were considered mixed waste. To eliminate the threat to human health and the environment, an ICM of removal, segregation, stabilization, and disposal was conducted from October through December 1996. Approximately 120 cubic yards (cu yds) of mixed waste, 188 cu yds of low-level radioactive-contaminated soil, 1 cu yd of low-level radioactive-contaminated debris, 5 cu yds of RCRA-characteristic hazardous waste, and 45 tons of nonhazardous debris were stabilized and disposed of during the ICM. To render the RCRA metals and radionuclides insoluble, stabilization was performed on the mixed and RCRA-characteristic waste streams. All stabilized material was subjected to TCLP analysis to verify it no longer exhibited RCRA-characteristic properties. Radiological and geophysical surveys were conducted concurrently with site remediation activities. These surveys provided real-time documentation of site conditions during each phase of the ICM and confirmed successful cleanup of the site. The three radioactive waste streams, stabilized mixed waste, low-level radioactive-contaminated soil, and low-level radioactive-contaminated debris, were disposed of at the Envirocare low-level radioactive disposal facility.« less

  19. Evaluation of the 1987-1988 EIA Remedial and Compensatory Program.

    ERIC Educational Resources Information Center

    South Carolina State Dept. of Education, Columbia. Office of Research.

    Evaluation of South Carolina's 1987-88 Remedial and Compensatory Program, funded by the state's Education Improvement Act of 1984 (EIA), shows that the program was successful in raising the participants' achievement. The programs include basic skills learning in reading and mathematics in all grades, and writing in grades 6-12, but not all grades…

  20. The use of historical imagery in the remediation of an urban hazardous waste site

    USGS Publications Warehouse

    Slonecker, E.T.

    2011-01-01

    The information derived from the interpretation of historical aerial photographs is perhaps the most basic multitemporal application of remote-sensing data. Aerial photographs dating back to the early 20th century can be extremely valuable sources of historical landscape activity. In this application, imagery from 1918 to 1927 provided a wealth of information about chemical weapons testing, storage, handling, and disposal of these hazardous materials. When analyzed by a trained photo-analyst, the 1918 aerial photographs resulted in 42 features of potential interest. When compared with current remedial activities and known areas of contamination, 33 of 42 or 78.5% of the features were spatially correlated with areas of known contamination or other remedial hazardous waste cleanup activity.

  1. Designing Clinical Remediation Programs.

    ERIC Educational Resources Information Center

    Oleszewski, Susan C.

    1989-01-01

    Elements and considerations in the provision of effective remediation for optometry students not achieving in clinical competence are discussed. Remediation of technical, cognitive, and noncognitive skills are included. A course in professional communication offered by the Pennsylvania College of Optometry is described. (MSE)

  2. SUPERFUND INNOVATIVE TECHNOLOGY EVALUATION PROGRAM ANNUAL REPORT TO CONGRESS FY 2002

    EPA Science Inventory

    This report details the Fiscal Year 2002 activities of the Superfund Innovative Technology Evaluation (SITE) Program. The Program focused on the remediation needs of the hazardous waste remediation community through demonstration and evaluation of innovative technologies for reme...

  3. SUPERFUND INNOVATIVE TECHNOLOGY EVALUATION PROGRAM ANNUAL REPORT TO CONGRESS FY 2001

    EPA Science Inventory

    This report details the fiscal year 2001 activities of the Superfund Innovative Technology Evaluation (SITE) Program. The Program focuses on the remediation needs of the hazardous waste remediation community through demonstration and evaluation of innovative technologies for re...

  4. Site Remediation Technology InfoBase: A Guide to Federal Programs, Information Resources, and Publications on Contaminated Site Cleanup Technologies. First Edition

    NASA Technical Reports Server (NTRS)

    1998-01-01

    Table of Contents: Federal Cleanup Programs; Federal Site Remediation Technology Development Assistance Programs; Federal Site Remediation Technology Development Electronic Data Bases; Federal Electronic Resources for Site Remediation Technology Information; Other Electronic Resources for Site Remediation Technology Information; Other Electronic Resources for Site Remediation Technology Information; Selected Bibliography: Federal Publication on Alternative and Innovative Site Remediation; and Appendix: Technology Program Contacts.

  5. Remedial investigation report on Waste Area Grouping 5 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 3 -- Appendix B: Technical findings and conclusions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-09-01

    This document provides the Environmental Restoration Program with information about the results of investigations performed at Waste Area Grouping (WAG) 5. It includes information on risk assessments that have evaluated long-term impacts to human health and the environment. Information provided in this document forms the basis for decisions regarding the need for subsequent remediation work at WAG 5. Sections B1.1 through B1.4 present an overview of the environmental setting of WAG 5, including location, population, land uses, ecology, and climate, and Sects. B1.5 through B1.7 give site-specific details (e.g., topography, soils, geology, and hydrology). The remediation investigation (RI) of WAGmore » 5 did not entail en exhaustive characterization of all physical attributes of the site; the information presented here focuses on those most relevant to the development and verification of the WAG 5 conceptual model. Most of the information presented in this appendix was derived from the RI field investigation, which was designed to complement the existing data base from earlier, site-specific studies of Solid Waste Storage Area (SWSA) 5 and related areas.« less

  6. Generic radiological characterization protocol for surveys conducted for DOE remedial action programs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berven, B.A.; Cottrell, W.D.; Leggett, R.W.

    1986-05-01

    This report describes goals and methodology that can be used by radiological survey contractors in surveys at properties associated with the Department of Energy's remedial action programs. The description includes: (1) a general discussion of the history of the remedial action programs; (2) the types of surveys that may be employed by the Radiological Survey Activities (RASA) contractor; (3) generic survey methods that may be used during radiological surveys; and (4) a format for presenting information and data in a survey report. 9 refs.

  7. 40 CFR 1.47 - Office of Solid Waste and Emergency Response.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the Agency's solid and hazardous wastes and emergency response programs. This Office has primary..., under the supervision of a Director, is responsible for the emergency and remedial response functions of...) Providing direction, guidance, and support to the Agency's non-enforcement emergency and remedial response...

  8. The use of historical imagery in the remediation of an urban hazardous waste site

    USGS Publications Warehouse

    Slonecker, E.T.

    2011-01-01

    The information derived from the interpretation of historical aerial photographs is perhaps the most basic multitemporal application of remote-sensing data. Aerial photographs dating back to the early 20th century can be extremely valuable sources of historical landscape activity. In this application, imagery from 1918 to 1927 provided a wealth of information about chemical weapons testing, storage, handling, and disposal of these hazardous materials. When analyzed by a trained photo-analyst, the 1918 aerial photographs resulted in 42 features of potential interest. When compared with current remedial activities and known areas of contamination, 33 of 42 or 78.5% of the features were spatially correlated with areas of known contamination or other remedial hazardous waste cleanup activity. ?? 2010 IEEE.

  9. The Chief Executive Officer's Leadership Role in Remedial and Developmental Programs.

    ERIC Educational Resources Information Center

    Lawler, Muriel; Bowes, S. Gregory

    1988-01-01

    Eighty percent of New Mexico's 17 community college and vocational school CEOs responded to a survey revealing that they have different views on what constitutes remedial and developmental programs; and although these programs are considered compatible with the CEOs' educational philosophy, programs are not viewed on equal basis with other college…

  10. Site remediation techniques in India: a review

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anomitra Banerjee; Miller Jothi

    India is one of the developing countries operating site remediation techniques for the entire nuclear fuel cycle waste for the last three decades. In this paper we intend to provide an overview of remediation methods currently utilized at various hazardous waste sites in India, their advantages and disadvantages. Over the years the site remediation techniques have been well characterized and different processes for treatment, conditioning and disposal are being practiced. Remediation Methods categorized as biological, chemical or physical are summarized for contaminated soils and environmental waters. This paper covers the site remediation techniques implemented for treatment and conditioning of wastelandsmore » arising from the operation of nuclear power plant, research reactors and fuel reprocessing units. (authors)« less

  11. Documents About the Approval to Dispose of Less than 50 Parts Per Million Polychlorinated Biphenyl Remediation Waste Issued to Utility Solid Waste Activities Group (USWAG) Members

    EPA Pesticide Factsheets

    This page contains the Final Approval Document, Response to Public Comments and Draft Approval Issued for Public Comment for the Approval to Dispose of Less than 50 Parts Per Million Polychlorinated Biphenyl Remediation Waste Issued to USWAG

  12. 76 FR 65182 - Indirect Cost Rates for the Damage Assessment, Remediation, and Restoration Program for Fiscal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-20

    ... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration Indirect Cost Rates for the Damage Assessment, Remediation, and Restoration Program for Fiscal Years 2009 and 2010 AGENCY: National... Atmospheric Administration's (NOAA's) Damage Assessment, Remediation, and Restoration Program (DARRP) is...

  13. Chemical tailoring of steam to remediate underground mixed waste contaminents

    DOEpatents

    Aines, Roger D.; Udell, Kent S.; Bruton, Carol J.; Carrigan, Charles R.

    1999-01-01

    A method to simultaneously remediate mixed-waste underground contamination, such as organic liquids, metals, and radionuclides involves chemical tailoring of steam for underground injection. Gases or chemicals are injected into a high pressure steam flow being injected via one or more injection wells to contaminated soil located beyond a depth where excavation is possible. The injection of the steam with gases or chemicals mobilizes contaminants, such as metals and organics, as the steam pushes the waste through the ground toward an extraction well having subatmospheric pressure (vacuum). The steam and mobilized contaminants are drawn in a substantially horizontal direction to the extraction well and withdrawn to a treatment point above ground. The heat and boiling action of the front of the steam flow enhance the mobilizing effects of the chemical or gas additives. The method may also be utilized for immobilization of metals by using an additive in the steam which causes precipitation of the metals into clusters large enough to limit their future migration, while removing any organic contaminants.

  14. System configuration management plan for 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vargo, G.F. Jr.

    1994-10-11

    The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management. The C-M model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOE Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phasesmore » of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life-cycle of the 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System.« less

  15. Early Predictors of Need for Remediation in the Australian General Practice Training Program: A Retrospective Cohort Study

    ERIC Educational Resources Information Center

    Magin, Parker; Stewart, Rebecca; Turnock, Allison; Tapley, Amanda; Holliday, Elizabeth; Cooling, Nick

    2017-01-01

    Underperforming trainees requiring remediation may threaten patient safety and are challenging for vocational training programs. Decisions to institute remediation are high-stakes--remediation being resource-intensive and emotionally demanding on trainees. Detection of underperformance requiring remediation is particularly problematic in general…

  16. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 1, Main text

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goins, L.F.; Webb, J.R.; Cravens, C.D.

    1992-09-01

    This publication contains 1035 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. These citations constitute the thirteenth in a series of reports prepared annually for the US Department of Energy (DOE) Environmental Restoration programs. Citations to foreign and domestic literature of all types. There are 13 major sections of the publication, including: (1) DOE Decontamination and Decommissioning Program; (2) Nuclear Facilities Decommissioning; (3) DOE Formerly Utilized Sites Remedial Action Program; (4) DOE Uranium Mill Tailings Remedial Action Project; (5) Uranium Mill Tailings Management; (6) DOE Environmental Restoration Program; (7) DOE Site-Specific Remedialmore » Actions; (8) Contaminated Site Restoration; (9) Remediation of Contaminated Soil and Groundwater; (10) Environmental Data Measurements, Management, and Evaluation; (11) Remedial Action Assessment and Decision-Making; (12) Technology Development and Evaluation; and (13) Environmental and Waste Management Issues. Bibliographic references are arranged in nine subject categories by geographic location and then alphabetically by first author, corporate affiliation, or publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word.« less

  17. Tank waste remediation system functions and requirements document

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carpenter, K.E

    1996-10-03

    This is the Tank Waste Remediation System (TWRS) Functions and Requirements Document derived from the TWRS Technical Baseline. The document consists of several text sections that provide the purpose, scope, background information, and an explanation of how this document assists the application of Systems Engineering to the TWRS. The primary functions identified in the TWRS Functions and Requirements Document are identified in Figure 4.1 (Section 4.0) Currently, this document is part of the overall effort to develop the TWRS Functional Requirements Baseline, and contains the functions and requirements needed to properly define the top three TWRS function levels. TWRS Technicalmore » Baseline information (RDD-100 database) included in the appendices of the attached document contain the TWRS functions, requirements, and architecture necessary to define the TWRS Functional Requirements Baseline. Document organization and user directions are provided in the introductory text. This document will continue to be modified during the TWRS life-cycle.« less

  18. A sediment mesocosm experiment to determine if the remediation of a shoreline waste disposal site in Antarctica caused further environmental impacts.

    PubMed

    Stark, Jonathan S; Johnstone, Glenn J; Riddle, Martin J

    2014-12-15

    A shoreline waste disposal site at Casey Station, Antarctica was removed because it was causing impacts in the adjacent marine environment (Brown Bay). We conducted a field experiment to determine whether the excavation created further impacts. Trays of clean, defaunated sediment were deployed at two locations within Brown Bay and two control locations, two years prior to remediation. Trays were sampled one year before, 1month before, 1month after and two years after the excavation. An increase in metals was found at Brown Bay two years after the remediation. However there was little evidence of impacts on sediment assemblages. Communities at each location were different, but differences from before to after the remediation were comparable, indicating there were unlikely to have been further impacts. We demonstrate that abandoned waste disposal sites in hydrologically active places in Antarctica can be removed without creating greater adverse impacts to ecosystems downstream. Crown Copyright © 2014. Published by Elsevier Ltd. All rights reserved.

  19. Handbook for a Self-Programmed Reading Diagnostic/Remediation Approach.

    ERIC Educational Resources Information Center

    Anderson, Gordon S.

    Intended to help reading teachers develop and demonstrate mastery of diagnostic or remediation skills prior to or with application in a real classroom, this handbook provides simulated materials for use within a course or staff development program to supplement lectures, discussions, readings, demonstrations, and films. Following an introduction,…

  20. Mercer County Community College Remedial Program Assessment, August 1988. Two Year Follow-Up of the Fall 1986 Cohort.

    ERIC Educational Resources Information Center

    Porter, Al

    This assessment of New Jersey's Mercer County Community College's (MCCC's) remedial program provides a program overview, results of a two-year follow-up of fall 1986 remedial students, and comparative data from previous years. The program overview examines policies and procedures concerning placement criteria, exit standards, program acceptance,…

  1. Summary Report of Laboratory Testing to Establish the Effectiveness of Proposed Treatment Methods for Unremediated and Remediated Nitrate Salt Waste Streams

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anast, Kurt Roy; Funk, David John

    The inadvertent creation of transuranic waste carrying hazardous waste codes D001 and D002 requires the treatment of the material to eliminate the hazardous characteristics and allow its eventual shipment and disposal at the Waste Isolation Pilot Plant (WIPP). This report documents the effectiveness of two treatment methods proposed to stabilize both the unremediated and remediated nitrate salt waste streams (UNS and RNS, respectively). The two technologies include the addition of zeolite (with and without the addition of water as a processing aid) and cementation. Surrogates were developed to evaluate both the solid and liquid fractions expected from parent waste containers,more » and both the solid and liquid fractions were tested. Both technologies are shown to be effective at eliminating the characteristic of ignitability (D001), and the addition of zeolite was determined to be effective at eliminating corrosivity (D002), with the preferred option1 of zeolite addition currently planned for implementation at the Waste Characterization, Reduction, and Repackaging Facility. During the course of this work, we established the need to evaluate and demonstrate the effectiveness of the proposed remedy for debris material, if required. The evaluation determined that Wypalls absorbed with saturated nitrate salt solutions exhibit the ignitability characteristic (all other expected debris is not classified as ignitable). Follow-on studies will be developed to demonstrate the effectiveness of stabilization for ignitable Wypall debris. Finally, liquid surrogates containing saturated nitrate salts did not exhibit the characteristic of ignitability in their pure form (those neutralized with Kolorsafe and mixed with sWheat did exhibit D001). As a result, additional nitrate salt solutions (those exhibiting the oxidizer characteristic) will be tested to demonstrate the effectiveness of the remedy.« less

  2. Humic Acids Enhanced U(VI) Attenuation in Acidic Waste Plumes: An In-situ Remediation Approach

    NASA Astrophysics Data System (ADS)

    Wan, J.; Dong, W.; Tokunaga, T. K.

    2010-12-01

    In the process of extracting plutonium for nuclear weapons production during the Cold War, large volumes of acidic waste solutions containing low-level radionuclides were discharged for decades into unlined seepage basins in several US Department of Energy (DOE) weapon facilities such as the Savannah River Site (SRS), Oak Ridge (OR), and 300 Area of the Hanford Site. Although the basins have been capped and some sites have gone through many years of active remediation, groundwaters currently remain acidic with pH values as low as 3.0 near the basins, and uranium concentrations remain much higher than its maximum contaminant level (MCL). A sustainable U biogeochemical remediation method has not yet been developed, especially under acidic conditions (pH 3-5). Bioreduction-based U remediation requires permanent maintenance of reducing conditions through indefinite supply of electron donor, and when applied in acidic plumes a high-cost pretreatment procedure is required. Methods based on precipitation of phosphate minerals depend on maintenance of high P concentrations. Precipitating of uranyl vanadates can lower U to below its MCL, but this approach is only effective at near-neutral pH. There is an urgent need for developing a sustainable method to control U mobility in acidic conditions. In this paper, we propose a method of using humic acids (HAs) to attenuate contaminant U mobility in acidic waste plumes. Our laboratory experiment results show that HAs are able to strongly and quickly adsorb onto aquifer sediments from the DOE’s SRS and OR. With a moderate addition of HA, U adsorption increased to near 100% at pH below 5.0. Because U partitioning onto the HA modified mineral surfaces is so strong, U concentration in groundwaters can be sustainably reduced to below its MCL. We conducted flow through experiments for U desorption by acidic groundwater leaching at pH 3.5 and 4.5 from HA-treated SRS contaminated sediments. The results show that desorption of both U

  3. Green remediation and recycling of contaminated sediment by waste-incorporated stabilization/solidification.

    PubMed

    Wang, Lei; Tsang, Daniel C W; Poon, Chi-Sun

    2015-03-01

    Navigational/environmental dredging of contaminated sediment conventionally requires contained marine disposal and continuous monitoring. This study proposed a green remediation approach to treat and recycle the contaminated sediment by means of stabilization/solidification enhanced by the addition of selected solid wastes. With an increasing amount of contaminated sediment (20-70%), the 28-d compressive strength of sediment blocks decreased from greater than 10MPa to slightly above 1MPa. For augmenting the cement hydration, coal fly ash was more effective than lime and ground seashells, especially at low sediment content. The microscopic and spectroscopic analyses showed varying amounts of hydration products (primarily calcium hydroxide and calcium silicate hydrate) in the presence of coal fly ash, signifying the influence of pozzolanic reaction. To facilitate the waste utilization, cullet from beverage glass bottles and bottom ashes from coal combustion and waste incineration were found suitable to substitute coarse aggregate at 33% replacement ratio, beyond which the compressive strength decreased accordingly. The mercury intrusion porosimetry analysis indicated that the increase in the total pore area and average pore diameter were linearly correlated with the decrease of compressive strength due to waste replacement. All the sediment blocks complied with the acceptance criteria for reuse in terms of metal leachability. These results suggest that, with an appropriate mixture design, contaminated sediment and waste materials are useful resources for producing non-load-bearing masonry units or fill materials for construction uses. Copyright © 2014 Elsevier Ltd. All rights reserved.

  4. A Report on College-Level Remedial/Developmental Programs in SREB States.

    ERIC Educational Resources Information Center

    Abraham, Ansley A., Jr.

    Remedial and developmental programs at two-year and four-year colleges in states belonging to the Southern Regional Education Board (SREB) were studied, along with placement standards for degree-credit, college-level work in SREB states and institutions. These programs, courses, and activities were designed specifically for first-time entering…

  5. Pretechnical Post Secondary Remedial Programs Training Institute. Final Report.

    ERIC Educational Resources Information Center

    Tompkins, Jack E.

    To promote and accelerate the creation of remedial training programs in technical institutes and community colleges, 46 participants from a wide geographic representation and from varied positions were selected to attend a 5-day training institute. Presentations by consultants and group discussions were utilized to meet the objects of developing a…

  6. Disposal Notifications and Quarterly Membership Updates for the Utility Solid Waste Group Members’ Risk-Based Approvals to Dispose of PCB Remediation Waste Under Title 40 of the Code of Federal Regulations Section 761.61(c)

    EPA Pesticide Factsheets

    Disposal Notifications and Quarterly Membership Updates for the Utility Solid Waste Group Members’ Risk-Based Approvals to Dispose of Polychlorinated Biphenyl (PCB) Remediation Waste Under Title 40 of the Code of Federal Regulations Section 761.61(c)

  7. Remediation of radiocesium-contaminated liquid waste, soil, and ash: a mini review since the Fukushima Daiichi Nuclear Power Plant accident.

    PubMed

    Ding, Dahu; Zhang, Zhenya; Lei, Zhongfang; Yang, Yingnan; Cai, Tianming

    2016-02-01

    The radiation contamination after the Fukushima Daiichi Nuclear Power Plant accident attracts considerable concern all over the world. Many countries, areas, and oceans are greatly affected by the emergency situation other than Japan. An effective remediation strategy is in a highly urgent demand. Though plenty of works have been carried out, progressive achievements have not yet been well summarized. Here, we review the recent advances on the remediation of radiocesium-contaminated liquid waste, soil, and ash. The overview of the radiation contamination is firstly given. Afterwards, the current remediation strategies are critically reviewed in terms of the environmental medium. Special attentions are paid on the adsorption/ion exchange and electrically switched ion exchange methods. Finally, the present review outlines the possible works to do for the large-scale application of the novel remediation strategies.

  8. USE OF ELECTROKINETICS FOR HAZARDOUS WASTE SITE REMEDIATION

    EPA Science Inventory

    The Superfund Innovative Technology Evaluation (SITE) program was authorized as part of the 1986 amendments to the Superfund legislation. It represents a joint effort between U.S. EPA`s Office of Research and Development and Office of Solid Waste and Emergency Response. The progr...

  9. Remediation of Highland Drive Landfill: Technical Challenges of Segregating Co-Mingled LLRW and Municipal Solid Waste in an Urbanized Area - 13319

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Daniel, Jeff; Lawrence, Dave; Case, Glenn

    Highland Drive Landfill is an inactive Municipal Solid Waste (MSW) Landfill which received waste from the 1940's until its closure in 1991. During a portion of its active life, the Landfill received low-level radioactive waste (LLRW) which currently exists both in a defined layer and co-mingled with MSW. Remediation of this site to remove the LLRW to meet established cleanup criteria, forms part of the Port Hope Project being undertaken by Atomic Energy Canada Limited (AECL) and Public Works and Government Services Canada (PWGSC) as part of the Port Hope Area Initiative (PHAI). The total volume of LLRW and co-mingledmore » LLRW/MSW estimated to require removal from the Highland Drive Landfill is approximately 51,900 cubic metres (m{sup 3}). The segregation and removal of LLRW at the Highland Drive Landfill presents a number of unique technical challenges due to the co-mingled waste and location of the Landfill in an urbanized area. Key challenges addressed as part of the design process included: delineation of the extent of LLRW, development of cut lines, and estimation of the quantity of co-mingled LLRW in a heterogeneous matrix; protection of adjacent receptors in a manner which would not impact the use of adjacent facilities which include residences, a recreational facility, and a school; coordination and phasing of the work to allow management of six separate material streams including clean soil, MSW, co-mingled LLRW/MSW, LLRW, un-impacted water, and impacted water/leachate within a confined environment; and development of a multi-tiered and adaptive program of monitoring and control measures for odour, dust, and water including assessment of risk of exceedance of monitoring criteria. In addition to ensuring public safety and protection of the environment during remedy implementation, significant effort in the design process was paid to balancing the advantages of increased certainty, including higher production rates, against the costs of attaining

  10. Engineered Option Treatment of Remediated Nitrate Salts: Surrogate Batch-Blending Testing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anast, Kurt Roy

    2016-03-11

    This report provides results from batch-blending test work for remediated nitrate salt (RNS) treatment. Batch blending was identified as a preferred option for blending RNS and unremediated nitrate salt (UNS) material with zeolite to effectively safe the salt/Swheat material identified as ignitable (U.S. Environmental Protection Agency code D001). Blending with zeolite was the preferred remediation option identified in the Options Assessment Report and was originally proposed as the best option for remediation by Clark and Funk in their report, Chemical Reactivity and Recommended Remediation Strategy for Los Alamos Remediated Nitrate Salt (RNS) Wastes, and also found to be a preferredmore » option in the Engineering Options Assessment Report: Nitrate Salt Waste Stream Processing. This test work evaluated equipment and recipe alternatives to achieve effective blending of surrogate waste with zeolite.« less

  11. 75 FR 43478 - Rhode Island: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-26

    ... submitting comments. E-mail: biscaia.robin@epa.gov . Fax: (617) 918-0642, to the attention of Robin Biscaia. Mail: Robin Biscaia, RCRA Waste Management Section, Office of Site Remediation and Restoration (OSRR 07... Delivery or Courier: Deliver your comments to: Robin Biscaia, RCRA Waste Management Section, Office of Site...

  12. Waste Separations and Pretreatment Workshop report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cruse, J.M.; Harrington, R.A.; Quadrel, M.J.

    1994-01-01

    This document provides the minutes from the Waste Separations and Pretreatment Workshop sponsored by the Underground Storage Tank-Integrated Demonstration in Salt Lake City, Utah, February 3--5, 1993. The Efficient Separations and Processing-Integrated Program and the Hanford Site Tank Waste Remediation System were joint participants. This document provides the detailed minutes, including responses to questions asked, an attendance list, reproductions of the workshop presentations, and a revised chart showing technology development activities.

  13. Nationwide Risk-Based PCB Remediation Waste Disposal Approvals under Title 40 of the Code of Federal Regulations (CFR) Section 761.61(c)

    EPA Pesticide Factsheets

    This page contains information about Nationwide Risk-Based Polychlorinated Biphenyls (PCBs) Remediation Waste Disposal Approvals under Title 40 of the Code of Federal Regulations (CFR) Section 761.61(c)

  14. Federal Remediation Technology Roundtable: Five Years of Cooperation

    EPA Pesticide Factsheets

    An overview of the activities of the Federal Remediation Technologies Roundtable--a working group seeking to build a more collaborative atmosphere among the federal agencies involved in hazardous waste site remediation.

  15. Remediation of a historically Pb contaminated soil using a model natural Mn oxide waste.

    PubMed

    McCann, Clare M; Gray, Neil D; Tourney, Janette; Davenport, Russell J; Wade, Matthew; Finlay, Nina; Hudson-Edwards, Karen A; Johnson, Karen L

    2015-11-01

    A natural Mn oxide (NMO) waste was assessed as an in situ remediation amendment for Pb contaminated sites. The viability of this was investigated using a 10 month lysimeter trial, wherein a historically Pb contaminated soil was amended with a 10% by weight model NMO. The model NMO was found to have a large Pb adsorption capacity (qmax 346±14 mg g(-1)). However, due to the heterogeneous nature of the Pb contamination in the soils (3650.54-9299.79 mg kg(-1)), no treatment related difference in Pb via geochemistry could be detected. To overcome difficulties in traditional geochemical techniques due to pollutant heterogeneity we present a new method for unequivocally proving metal sorption to in situ remediation amendments. The method combines two spectroscopic techniques; namely electron probe microanalysis (EPMA) and X-ray photoelectron spectroscopy (XPS). Using this we showed Pb immobilisation on NMO, which were Pb free prior to their addition to the soils. Amendment of the soil with exogenous Mn oxide had no effect on microbial functioning, nor did it perturb the composition of the dominant phyla. We conclude that NMOs show excellent potential as remediation amendments. Copyright © 2015 The Authors. Published by Elsevier Ltd.. All rights reserved.

  16. GROUND WATER REMEDIATION POWERED WITH RENEWABLE ENERGY

    EPA Science Inventory

    Technical challenge: Resource conservation has become a critical concept in the remediation of contaminated ground water supplies. Ground water remedies which include surface discharge of treated ground water are often viewed as wasteful and non-sustainable....

  17. Special Studies--A Statewide Remedial Mathematics Program of the University System of Georgia.

    ERIC Educational Resources Information Center

    Chang, Ping-Tung

    Drawing upon selected findings from student and faculty surveys, this report describes the remedial mathematics component of the University of Georgia's Special Studies Program. After examining the need for basic skills programs in an era of declining test scores and open admissions policies, the report describes the Special Studies Program's…

  18. Salmon Site Remedial Investigation Report, Exhibit 5

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    USDOE /NV

    1999-09-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides intomore » the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  19. Salmon Site Remedial Investigation Report, Main Body

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    US DOE /NV

    1999-09-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides intomore » the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  20. Salmon Site Remedial Investigation Report, Exhibit 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    USDOE NV

    1999-09-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides intomore » the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the

  1. Solid Waste Assurance Program Implementation Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Irons, L.G.

    1995-06-19

    On June 6, 1995, a waiver to Hanford Site Solid Waste Acceptance Criteria, was approved by the US Department of Energy Richland Operations Office (RL) to replace the low-level, mixed, and transuranic (TRU) generator assessment programs with the Solid Waste Assurance Program (SWAP). This is associated with a waiver that was approved on March 16, 1995 to replace the Storage/Disposal Approval Record (SDAR) requirements with the Waste Specification System (WSS). This implementation plan and the SWAP applies to Solid Waste Disposal (SWD) functions, facilities, and personnel who perform waste acceptance, verification, receipt, and management functions of dangerous, radioactive, and mixedmore » waste from on- and off-site generators who ship to or within the Hanford Site for treatment, storage, and/or disposal (TSD) at SWD TSD facilities.« less

  2. Task 1.6 -- Mixed waste treatment. Semi-annual report, January 1--June 30, 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rindt, J.R.

    1997-08-01

    Mixed-waste sites make up the majority of contaminated sites, yet remediation techniques used at such sites often target only the most prevalent contaminant. A better understanding of site situation (i.e., most common types of contamination), current remediation techniques, and combinations of techniques would provide insight into areas in which further research should be performed. The first half of this task program year consisted of a survey of common types of mixed-wastes sites and a detailed literature search of the remediation techniques and combinations of techniques that were currently available. From this information, an assessment of each of the techniques wasmore » made and combined into various ways appropriate to mixed-waste protocol. This activity provided insight into areas in which further research should be performed.« less

  3. SUPERFUND INNOVATIVE TECHNOLOGY EVALUATION PROGRAM: TECHNOLOGY WITH AN IMPACT

    EPA Science Inventory

    SITE promotes the development and implementation of innovative technologies for remediating hazardous waste sites and for evaluating the nature and extent of hazardous waste site contamination through four component segments. The SITE Program is a key element in EPA's efforts...

  4. Resident Evaluation and Remediation: A Comprehensive Approach

    PubMed Central

    Wu, Jim S.; Siewert, Bettina; Boiselle, Phillip M.

    2010-01-01

    Background A comprehensive evaluation and remediation program is an essential component of any residency program. The evaluation system should identify problems accurately and early and allow residents with problems to be assigned to a remediation program that effectively deals with them. Elements of a proactive remediation program include a process for outlining deficiencies, providing resources for improvement, communicating clear goals for acceptable performance, and reevaluating performance against these goals. Intervention In recognition of the importance of early detection and prompt remediation of the struggling resident, we sought to develop a multifaceted approach to resident evaluation with the aim of early identification and prompt remediation of difficulties. This article describes our comprehensive evaluation program and remediation program, which uses resources within our radiology department and institutional graduate medical education office. Discussion An effective evaluation system should identify problems accurately and early, whereas a proactive remediation program should effectively deal with issues once they are identified. PMID:21975628

  5. Students Leading Students: An Observational Study of a University Remedial Educational Program

    ERIC Educational Resources Information Center

    Chavez, Michael Juan; Ysais, Michelle

    2017-01-01

    This article provides a unique insider perspective developing leadership at the undergraduate level. A case study approach was used to examine the efficacy of a peer mentoring program for remedial students.

  6. Managing Waste Inventory and License Limits at the Perma-Fix Northwest Facility to Meet CH2M Hill Plateau Remediation Company (CHPRC) American Recovery and Reinvestment Act (ARRA) Deliverables - 12335

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moak, Don J.; Grondin, Richard L.; Triner, Glen C.

    CH2M Hill Plateau Remediation Company (CHRPC) is a prime contractor to the U.S. Department of Energy (DOE) focused on the largest ongoing environmental remediation project in the world at the DOE Hanford Site Central Plateau, i.e. the DOE Hanford Plateau Remediation Contract. The East Tennessee Materials and Energy Corporation (M and EC); a wholly owned subsidiary of Perma-Fix Environmental Services, Inc. (PESI), is a small business team member to CHPRC. Our scope includes project management; operation and maintenance of on-site storage, repackaging, treatment, and disposal facilities; and on-site waste management including waste receipt from generators and delivery to on-site andmore » off-site treatment, storage, and disposal facilities. As part of this scope, M and EC staffs the centralized Waste Support Services organization responsible for all waste characterization and acceptance required to support CHPRC and waste generators across the Hanford Site. At the time of the CHPRC contract award (August 2008) slightly more than 9,000 cubic meters (m{sup 3}) of legacy waste was defined as 'no-path-forward waste'. A significant portion of this waste (7,650 m{sup 3}) comprised wastes with up to 50 grams of special nuclear materials (SNM) in oversized packages recovered during retrieval operations and large glove boxes removed from the Plutonium Finishing Plant (PFP). Through a collaborative effort between the DOE, CHPRC, and Perma-Fix Environmental Services, Inc. (PESI), pathways for these problematic wastes were developed that took advantage of commercial treatment capabilities at a nearby vendor facility, Perma-Fix Northwest (PFNW). In the spring of 2009, CHPRC initiated a pilot program under which they began shipping large package, low gram suspect TRU (<15 g SNM per container), and large package contact and remote handled MLLW to the off-site PFNW facility for treatment. PFNW is restricted by the SNM limits set for the total quantity of SNM allowed at the

  7. Development of monitoring and diagnostic methods for robots used in remediation of waste sites. 1997 annual progress report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tecza, J.

    1998-06-01

    'Safe and efficient clean up of hazardous and radioactive waste sites throughout the DOE complex will require extensive use of robots. This research effort focuses on developing Monitoring and Diagnostic (M and D) methods for robots that will provide early detection, isolation, and tracking of impending faults before they result in serious failure. The utility and effectiveness of applying M and D methods to hydraulic robots has never been proven. The present research program is utilizing seeded faults in a laboratory test rig that is representative of an existing hydraulically-powered remediation robot. This report summarizes activity conducted in the firstmore » 9 months of the project. The research team has analyzed the Rosie Mobile Worksystem as a representative hydraulic robot, developed a test rig for implanted fault testing, developed a test plan and agenda, and established methods for acquiring and analyzing the test data.'« less

  8. Removing Remediation Requirements: Effectiveness of Intervention Programs

    ERIC Educational Resources Information Center

    Fine, Anne; Duggan, Mickle; Braddy, Linda

    2009-01-01

    Remediation of incoming college freshman students is a national concern because remediated students are at higher risk of failing to complete their degrees. Some Oklahoma higher education institutions are working to assist K-12 systems in finding ways to reduce the number of incoming college freshman students requiring remediation. This study…

  9. 40 CFR 258.57 - Selection of remedy.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 258.57 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective Action § 258.57 Selection of remedy... environment; and (4) Comply with standards for management of wastes as specified in § 258.58(d). (c) In...

  10. 40 CFR 258.57 - Selection of remedy.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 258.57 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective Action § 258.57 Selection of remedy... environment; and (4) Comply with standards for management of wastes as specified in § 258.58(d). (c) In...

  11. Final Hazard Categorization for the Remediation of Six 300-FF-2 Operable Unit Solid Waste Burial Grounds

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    J. D. Ludowise

    2006-12-12

    This report provides the final hazard categorization (FHC) for the remediation of six solid waste disposal sites (referred to as burial grounds) located in the 300-FF-2 Operable Unit (OU) on the Hanford Site. These six sites (618-1, 618-2, 618-3, 618-7, 618-8, and 618-13 Burial Grounds) were determined to have a total radionuclide inventory (WCH 2005a, WCH 2005d, WCH 2005e and WCH 2006b) that exceeds the DOE-STD-1027 Category 3 threshold quantity (DOE 1997) and are the subject of this analysis. This FHC document examines the hazards, identifies appropriate controls to manage the hazards, and documents the FHC and commitments for themore » 300-FF-2 Burial Grounds Remediation Project.« less

  12. Reinventing Remedial Education

    ERIC Educational Resources Information Center

    Stuart, Reginald

    2009-01-01

    Remedial education, although widely used and disguised with other names, was rarely talked about for it could tarnish a school's reputation if widely discussed. Today, more and more colleges and universities are ditching the old stigma associated with remedial education, reinventing their remedial education and retention programs and, in the…

  13. Engineering study of 50 miscellaneous inactive underground radioactive waste tanks located at the Hanford Site, Washington

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Freeman-Pollard, J.R.

    1994-03-02

    This engineering study addresses 50 inactive underground radioactive waste tanks. The tanks were formerly used for the following functions associated with plutonium and uranium separations and waste management activities in the 200 East and 200 West Areas of the Hanford Site: settling solids prior to disposal of supernatant in cribs and a reverse well; neutralizing acidic process wastes prior to crib disposal; receipt and processing of single-shell tank (SST) waste for uranium recovery operations; catch tanks to collect water that intruded into diversion boxes and transfer pipeline encasements and any leakage that occurred during waste transfer operations; and waste handlingmore » and process experimentation. Most of these tanks have not been in use for many years. Several projects have, been planned and implemented since the 1970`s and through 1985 to remove waste and interim isolate or interim stabilize many of the tanks. Some tanks have been filled with grout within the past several years. Responsibility for final closure and/or remediation of these tanks is currently assigned to several programs including Tank Waste Remediation Systems (TWRS), Environmental Restoration and Remedial Action (ERRA), and Decommissioning and Resource Conservation and Recovery Act (RCRA) Closure (D&RCP). Some are under facility landlord responsibility for maintenance and surveillance (i.e. Plutonium Uranium Extraction [PUREX]). However, most of the tanks are not currently included in any active monitoring or surveillance program.« less

  14. Transuranic Waste Test Facility Development Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Looper, M.G.

    1987-05-05

    This letter discusses the development and test program planned for the Transuranic Waste Test Facility (TWTF). The planned effort is based on previous work in the ADandD Pilot Facility and testing of TWTF equipment before installation. Input from Waste Management and AED Fairview is included. The program will focus on the following areas: Retrieval; Material Handling; Size Reduction; Operation and Maintenance. The program will take 1-1/2 to 2 years to complete and began in December 1986. Technical Data Summaries (TDS) and basic data reports will be issued periodically to document results and provide basic data for the Transuranic Waste Facilitymore » (TWF). 2 refs., 2 figs.« less

  15. Implementing Cognitive Remediation Programs in France: The "Secret Sauce".

    PubMed

    Amado, Isabelle; Sederer, Lloyd I

    2016-07-01

    Cognitive remediation (CR) is a psychosocial therapy that seeks to restore patients' cognitive abilities by providing strategies to improve functioning in cognitive domains and helping them transfer acquired capabilities to everyday life. Since 2008, CR programs have been introduced in several regional health ministry areas in France. This column describes that implementation initiative, which includes creation of a network of the most active CR programs to conduct multicenter trials; establishment of a university degree in CR, awarded after completion of a one-year clinical training program; and implementation activities of regional health agencies. The authors describe three core elements of a "secret sauce"-a common language, timing, and leadership-that has helped ensure the success of the implementation efforts and that may be useful in other countries.

  16. Utilization of waste materials, non-refined materials, and renewable energy in in situ remediation and their sustainability benefits.

    PubMed

    Favara, Paul; Gamlin, Jeff

    2017-12-15

    In the ramp-up to integrating sustainability into remediation, a key industry focus area has been to reduce the environmental footprint of treatment processes. The typical approach to integrating sustainability into remediation projects has been a top-down approach, which involves developing technology options and then applying sustainability thinking to the technology, after it has been conceptualized. A bottom-up approach allows for systems thinking to be included in remedy selection and could potentially result in new or different technologies being considered. When using a bottom-up approach, there is room to consider the utilization of waste materials, non-refined materials, and renewable energy in remediation technology-all of which generally have a smaller footprint than processed materials and traditional forms of energy. By integrating more systems thinking into remediation projects, practitioners can think beyond the traditional technologies typically used and how technologies are deployed. To compare top-down and bottom-up thinking, a traditional technology that is considered very sustainable-enhanced in situ bioremediation-is compared to a successful, but infrequently deployed technology-subgrade biogeochemical reactors. Life Cycle Assessment is used for the evaluation and shows the footprint of the subgrade biogeochemical reactor to be lower in all seven impact categories evaluated, sometimes to a significant degree. Copyright © 2017 Elsevier Ltd. All rights reserved.

  17. INNOVATIVE SOIL AND GROUNDWATER REMEDIATION: THE SITE PROGRAM EXPERIENCE

    EPA Science Inventory

    The SITE program of the USEPA has been bringing together the private sector, EPA, and other federal and state agencies to succedssfully address complex hazardous waste problems. For more than 15 years, the SITE Program has successfully promoted the development, commercialization ...

  18. Remediating MGP brownfields

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larsen, B.R.

    Before natural gas pipelines became widespread in this country, gas fuel was produced locally in more than 5,000 manufactured gas plants (MGPs). The toxic wastes from these processes often were disposed onsite and have since seeped into the surrounding soil and groundwater. Although the MGPs--commonly called gas plants, gas-works or town gas plants--have closed and most have been demolished, they have left a legacy of environmental contamination. At many MGP sites, underground storage tanks were constructed of wood or brick, with process piping and equipment which frequently leaked. Waste materials often were disposed onsite. Releases of coal tars, oils andmore » condensates produced within the plants contributed to a wide range of contamination from polycyclic aromatic hydrocarbons, phenols, benzene and cyanide. Remediation of selected MGP sites has been sporadic. Unless the site has been identified as a Comprehensive Environmental Response, Compensation and Liability Information System (CERCLIS) Superfund site, the regulatory initiative to remediate often remains with the state in which the MGP is located. A number of factors are working to change that picture and to create a renewed interest in MGP site remediation. The recent Brownfield Initiative by the US Environmental Protection Agency (EPA) is such an example.« less

  19. Remediation of AMD using industrial waste adsorbents

    NASA Astrophysics Data System (ADS)

    Mohammed, Nuur Hani Bte; Yaacob, Wan Zuhairi Wan

    2016-11-01

    The study investigates the characteristic of industrial waste as adsorbents and its potential as heavy metals absorbents in AMD samples. The AMD sample was collected from active mine pond and the pH was measured in situ. The metal contents were analyzed by ICP-MS. The AMD water was very acidic (pH< 3.5), and the average heavy metals content in AMD were high especially in Fe (822.029 mg/l). Fly ash was found to be the most effective absorbent material containing high percentage of CaO (57.24%) and SiO2 (13.88%), followed by ladle furnace slag containing of high amount of CaO (51.52%) and Al2O3 (21.23%), while biomass ash consists of SiO2 (43.07%) and CaO (12.97%). Tank analysis display a huge changes due to pH value change from acidity to nearly neutral phases. After 50 days, fly ash remediation successfully increase the AMD pH values from pH 2.57-7.09, while slag change from acidity to nearly alkaline phase from pH 2.60-7.3 and biomass has change to pH 2.54-6.8. Fly ash has successfully remove Fe, Mn, Cu, and Ni. Meanwhile, slag sample displays as an effective adsorbent to adsorb more Pb and Cd in acid mine drainage.

  20. Toxic remediation

    DOEpatents

    Matthews, Stephen M.; Schonberg, Russell G.; Fadness, David R.

    1994-01-01

    What is disclosed is a novel toxic waste remediation system designed to provide on-site destruction of a wide variety of hazardous organic volatile hydrocarbons, including but not limited to halogenated and aromatic hydrocarbons in the vapor phase. This invention utilizes a detoxification plenum and radiation treatment which transforms hazardous organic compounds into non-hazardous substances.

  1. The Challenges Of Investigating And Remediating Port Hope's Small-Scale Urban Properties - 13115

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Veen, Walter van; Case, Glenn; Benson, John

    2013-07-01

    An important component of the Port Hope Project, the larger of the two projects comprising the Port Hope Area Initiative (PHAI), is the investigation of all 4,800 properties in the Municipality of Port Hope for low level radioactive waste (LLRW) and the remediation of approximately 10% of these. Although the majority of the individual properties are not expected to involve technically sophisticated remediation programs, the large number of property owners and individually unique properties are expected to present significant logistic challenges that will require a high degree of planning, organization and communication. The protocol and lessons learned described will bemore » of interest to those considering similar programs. Information presented herein is part of a series of papers presented by the PHAI Management Office (PHAI MO) at WM Symposium '13 describing the history of the Port Hope Project and current project status. Other papers prepared for WM Symposium '13 address the large-scale site cleanup and the construction of the long-term waste management facility (LTWMF) where all of the LLRW will be consolidated and managed within an engineered, above-ground mound. (authors)« less

  2. Predictors of performance improvements within a cognitive remediation program for schizophrenia.

    PubMed

    Scheu, Florian; Aghotor, Julia; Pfueller, Ute; Moritz, Steffen; Bohn, Francesca; Weisbrod, Matthias; Roesch-Ely, Daniela

    2013-10-30

    Cognitive impairment is regarded a core feature of schizophrenia and is associated with low psychosocial functioning. There is rich evidence that cognitive remediation can improve cognitive functions in patients with schizophrenia. However, little is known about what predicts individual remediation success. Some studies suggest that baseline cognitive impairment might be a limiting factor for training response. Aim of the current study was to further examine the role of cognitive and symptom variables as predictors of remediation success. We studied a total sample of 32 patients with schizophrenia and schizoaffective disorder who were engaged in a computer-based cognitive training program (CogPack). A pre-training test battery provided cognitive measures of selective attention, executive functioning, processing speed, verbal memory, and verbal intelligence along with measures for positive and negative symptoms. Training response was defined as improvement on training tasks. Correlation analyses revealed no significant relationship between any of the baseline cognitive or symptom measures and improvement rates. However, better baseline cognition was associated with a higher percentage of tasks with initial ceiling effects. We conclude that not carefully tailoring task difficulty to patients' cognitive abilities constitutes a much more severe threat to cognitive remediation success than cognitive impairment itself. © 2013 Elsevier Ireland Ltd. All rights reserved.

  3. Diagnostics for a waste processing plasma arc furnace (invited) (abstract)a)

    NASA Astrophysics Data System (ADS)

    Woskov, P. P.

    1995-01-01

    Maintaining the quality of our environment has become an important goal of society. As part of this goal new technologies are being sought to clean up hazardous waste sites and to treat ongoing waste streams. A 1 MW pilot scale dc graphite electrode plasma arc furnace (Mark II) has been constructed at MIT under a joint program among Pacific Northwest Laboratory (PNL), MIT, and Electro-Pyrolysis, Inc. (EPI)c) for the remediation of buried wastes in the DOE complex. A key part of this program is the development of new and improved diagnostics to study, monitor, and control the entire waste remediation process for the optimization of this technology and to safeguard the environment. Continuous, real time diagnostics are needed for a variety of the waste process parameters. These parameters include internal furnace temperatures, slag fill levels, trace metals content in the off-gas stream, off-gas molecular content, feed and slag characterization, and off-gas particulate size, density, and velocity distributions. Diagnostics are currently being tested at MIT for the first three parameters. An active millimeter-wave radiometer with a novel, rotatable graphite waveguide/mirror antenna system has been implemented on Mark II for the measurement of surface emission and emissivity which can be used to determine internal furnace temperatures and fill levels. A microwave torch plasma is being evaluated for use as a excitation source in the furnace off-gas stream for continuous atomic emission spectroscopy of trace metals. These diagnostics should find applicability not only to waste remediation, but also to other high temperature processes such as incinerators, power plants, and steel plants.

  4. Remedial investigation report on Waste Area Grouping 5 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 1: Technical summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-09-01

    A remedial investigation (RI) was performed to support environmental restoration activities for Waste Area Grouping (WAG) 5 at the Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee. The WAG 5 RI made use of the observational approach, which concentrates on collecting only information needed to assess site risks and support future cleanup work. This information was interpreted and is presented using the framework of the site conceptual model, which relates contaminant sources and release mechanisms to migration pathways and exposure points that are keyed to current and future environmental risks for both human and ecological receptors. The site conceptualmore » model forms the basis of the WAG 5 remedial action strategy and remedial action objectives. The RI provided the data necessary to verify this model and allows recommendations to be made to accomplish those objectives.« less

  5. Comprehensive implementation plan for the DOE defense buried TRU- contaminated waste program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Everette, S.E.; Detamore, J.A.; Raudenbush, M.H.

    1988-02-01

    In 1970, the US Atomic Energy Commission established a transuranic'' (TRU) waste classification. Waste disposed of prior to the decision to retrievably store the waste and which may contain TRU contamination is referred to as buried transuranic-contaminated waste'' (BTW). The DOE reference plan for BTW, stated in the Defense Waste Management Plan, is to monitor it, to take such remedial actions as may be necessary, and to re-evaluate its safety as necessary or in about 10-year periods. Responsibility for management of radioactive waste and byproducts generated by DOE belongs to the Secretary of Energy. Regulatory control for these sites containingmore » mixed waste is exercised by both DOE (radionuclides) and EPA (hazardous constituents). Each DOE Operations Office is responsible for developing and implementing plans for long-term management of its radioactive and hazardous waste sites. This comprehensive plan includes site-by-site long-range plans, site characteristics, site costs, and schedules at each site. 13 figs., 15 tabs.« less

  6. 32 CFR 310.47 - Civil remedies.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 2 2010-07-01 2010-07-01 false Civil remedies. 310.47 Section 310.47 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED) PRIVACY PROGRAM DOD PRIVACY PROGRAM Privacy Act Violations § 310.47 Civil remedies. In addition to specific remedial...

  7. 32 CFR 310.47 - Civil remedies.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 2 2011-07-01 2011-07-01 false Civil remedies. 310.47 Section 310.47 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED) PRIVACY PROGRAM DOD PRIVACY PROGRAM Privacy Act Violations § 310.47 Civil remedies. In addition to specific remedial...

  8. 32 CFR 310.47 - Civil remedies.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 2 2012-07-01 2012-07-01 false Civil remedies. 310.47 Section 310.47 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED) PRIVACY PROGRAM DOD PRIVACY PROGRAM Privacy Act Violations § 310.47 Civil remedies. In addition to specific remedial...

  9. 32 CFR 310.47 - Civil remedies.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 2 2013-07-01 2013-07-01 false Civil remedies. 310.47 Section 310.47 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED) PRIVACY PROGRAM DOD PRIVACY PROGRAM Privacy Act Violations § 310.47 Civil remedies. In addition to specific remedial...

  10. 32 CFR 310.47 - Civil remedies.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 2 2014-07-01 2014-07-01 false Civil remedies. 310.47 Section 310.47 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED) PRIVACY PROGRAM DOD PRIVACY PROGRAM Privacy Act Violations § 310.47 Civil remedies. In addition to specific remedial...

  11. GROUNDWATER REMEDIATION SOLUTIONS AT HANFORD

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gilmore, Tyler J.; Truex, Michael J.; Williams, Mark D.

    2007-02-26

    In 2006, Congress provided funding to the U. S. Department of Energy (DOE) to study new technologies that could be used to treat contamination from the Hanford Site that might impact the Columbia River. The contaminants of concern are primarily metals and radionuclides, which are byproducts of Hanford’s cold war mission to produce plutonium for atomic weapons. The DOE asked Pacific Northwest National Laboratory (PNNL) to consider this problem and develop approaches to address the contamination that threatens the river. DOE identified three high priority sites that had groundwater contamination migrating towards the Columbia river for remediation. The contaminants includedmore » strontium-90, uranium and chromium. Remediation techniques for metals and radionuclides focus primarily on altering the oxidation state of the contaminant chemically or biologically, isolating the contaminants from the environment through adsorption or encapsulation or concentrating the contaminants for removal. A natural systems approach was taken that uses a mass balance concept to frame the problem and determine the most appropriate remedial approach. This approach provides for a scientifically based remedial decision. The technologies selected to address these contaminants included an apatite adsorption barrier coupled with a phytoremediation to address the strontium-90 contamination, injection of polyphosphate into the subsurface to sequester uranium, and a bioremediation approach to reduce chromium contamination in the groundwater. The ability to provide scientifically based approaches is in large part due to work developed under previous DOE Office of Science and Office of Environmental Management projects. For example, the polyphosphate and the bioremediation techniques, were developed by PNNL under the EMSP and NABIR programs. Contaminated groundwater under the Hanford Site poses a potential risk to humans and the Columbia River. These new technologies holds great promise for

  12. Waste treatability guidance program. User`s guide. Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Toth, C.

    1995-12-21

    DOE sites across the country generate and manage radioactive, hazardous, mixed, and sanitary wastes. It is necessary for each site to find the technologies and associated capacities required to manage its waste. One role of DOE HQ Office of Environmental Restoration and Waste Management is to facilitate the integration of the site- specific plans into coherent national plans. DOE has developed a standard methodology for defining and categorizing waste streams into treatability groups based on characteristic parameters that influence waste management technology needs. This Waste Treatability Guidance Program automates the Guidance Document for the categorization of waste information into treatabilitymore » groups; this application provides a consistent implementation of the methodology across the National TRU Program. This User`s Guide provides instructions on how to use the program, including installations instructions and program operation. This document satisfies the requirements of the Software Quality Assurance Plan.« less

  13. A pilot study of a combined group and individual functional remediation program for patients with bipolar I disorder.

    PubMed

    Zyto, Susan; Jabben, Nienke; Schulte, Peter F J; Regeer, Barbara J; Kupka, Ralph W

    2016-04-01

    Bipolar disorder has been associated with a decrease in cognitive functioning affecting the functional outcome of patients independent of mood states. However, there have only been few attempts to investigate the effects of functional remediation for patients with bipolar disorder. The current study investigates the feasibility and effectiveness of a combined group and individual functional remediation program for bipolar disorder, including both patients and their caregivers. Twelve participants diagnosed with bipolar I disorder, and their caregivers, were treated with a combined group and individual functional remediation program. The feasibility of the program was evaluated by dropout rates and participants' evaluations of the program. The effectiveness of the program was explored through the assessment of functional outcome at baseline, immediately post-treatment, and follow-up three months later. The results indicate a high degree of satisfaction and a low dropout rate with the current program. Assessment of outcomes suggests improved functioning in the areas of autonomy and occupational functioning, evolving from baseline to follow-up. Due to a small sample size and the lack of a control group the results are preliminary. This relatively brief intervention offers a more tailor-made approach to functional remediation and shows good feasibility, acceptability and improvement of functioning in patients with bipolar I disorder. Copyright © 2016 Elsevier B.V. All rights reserved.

  14. Assessment of remote sensing technologies to discover and characterize waste sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1992-03-11

    This report presents details about waste management practices that are being developed using remote sensing techniques to characterize DOE waste sites. Once the sites and problems have been located and characterized and an achievable restoration and remediation program have been established, efforts to reclaim the environment will begin. Special problems to be considered are: concentrated waste forms in tanks and pits; soil and ground water contamination; ground safety hazards for workers; and requirement for long-term monitoring.

  15. Waste certification program plan for Oak Ridge National Laboratory. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Orrin, R.C.

    1997-05-01

    This document defines the waste certification program developed for implementation at Oak Ridge National Laboratory (ORNL). The document describes the program structure, logic, and methodology for certification of ORNL wastes. The purpose of the waste certification program is to provide assurance that wastes are properly characterized and that the Waste Acceptance Criteria (WAC) for receiving facilities are met. The program meets the waste certification requirements outlined in US Department of Energy (DOE) Order 5820.2A, Radioactive Waste Management, and ensures that 40 CFR documentation requirements for waste characterization are met for mixed (both radioactive and hazardous) and hazardous (including polychlorinated biphenyls)more » waste. Program activities will be conducted according to ORNL Level 1 document requirements.« less

  16. Natural Remediation at Savannah River Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lewis, C. M.; Van Pelt, R.

    2002-02-25

    Natural remediation is a general term that includes any technology or strategy that takes advantage of natural processes to remediate a contaminated media to a condition that is protective of human health and the environment. Natural remediation techniques are often passive and minimally disruptive to the environment. They are generally implemented in conjunction with traditional remedial solutions for source control (i.e., capping, stabilization, removal, soil vapor extraction, etc.). Natural remediation techniques being employed at Savannah River Site (SRS) include enhanced bio-remediation, monitored natural attenuation, and phytoremediation. Enhanced bio-remediation involves making nutrients available and conditions favorable for microbial growth. With propermore » precautions and feeding, the naturally existing microbes flourish and consume the contaminants. Case studies of enhanced bio-remediation include surface soils contaminated with PCBs and pesticides, and Volatile Organic Compound (VOC) contamination in both the vadose zone and groundwater. Monitored natural attenuation (MNA) has been selected as the preferred alternative for groundwater clean up at several SRS waste units. Successful implementation of MNA has been based on demonstration that sources have been controlled, groundwater modeling that indicates that plumes will not expand or reach surface water discharge points at levels that exceed regulatory limits, and continued monitoring. Phytoremediation is being successfully utilized at several SRS waste units. Phytoremediation involves using plants and vegetation to uptake, break down, or manage contaminants in groundwater or soils. Case studies at SRS include managing groundwater plumes of tritium and VOCs with pine trees that are native to the area. Significant decreases in tritium discharge to a site stream have been realized in one phytoremediation project. Studies of other vegetation types, methods of application, and other target contaminants

  17. Waste remediation

    DOEpatents

    Halas, Nancy J.; Nordlander, Peter; Neumann, Oara

    2017-01-17

    A system including a steam generation system and a chamber. The steam generation system includes a complex and the steam generation system is configured to receive water, concentrate electromagnetic (EM) radiation received from an EM radiation source, apply the EM radiation to the complex, where the complex absorbs the EM radiation to generate heat, and transform, using the heat generated by the complex, the water to steam. The chamber is configured to receive the steam and an object, wherein the object is of medical waste, medical equipment, fabric, and fecal matter.

  18. Waste remediation

    DOEpatents

    Halas, Nancy J.; Nordlander, Peter; Neumann, Oara

    2015-12-29

    A system including a steam generation system and a chamber. The steam generation system includes a complex and the steam generation system is configured to receive water, concentrate electromagnetic (EM) radiation received from an EM radiation source, apply the EM radiation to the complex, where the complex absorbs the EM radiation to generate heat, and transform, using the heat generated by the complex, the water to steam. The chamber is configured to receive the steam and an object, wherein the object is of medical waste, medical equipment, fabric, and fecal matter.

  19. 40 CFR 761.347 - First level sampling-waste from existing piles.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Purposes of Characterization for PCB Disposal in Accordance With § 761.62, and Sampling PCB Remediation... a cone; that is, having a circular base with PCB bulk product waste or PCB remediation waste... one pile. If the PCB bulk product waste or PCB remediation waste consists of more than one pile or...

  20. SYNOPSES OF FEDERAL DEMONSTRATIONS OF INNOVATIVE REMEDIATION TECHNOLOGIES

    EPA Science Inventory

    This collection of abstracts, compiled by the Federal Remediation Technology Roundtable, describes field demonstrations of innovative technologies to treat hazardous waste. The collection is intended to be an information resource for hazardous waste site project managers for asse...

  1. SUPERFUND INNOVATIVE TECHNOLOGY EVALUATION PROGRAM: INNOVATION MAKING A DIFFERENCE

    EPA Science Inventory

    The Superfund Innovative Technology Evaluation (SITE) Program encourages commercialization of innovative technologies for characterizing and remediating hazardous waste site contamination through four components: Demonstration, Emerging Technology, and Monitoring & Measurement Pr...

  2. Characterization and remediation of 91B radioactive waste sites under performance based contracts at Lackland Air Force Base, San Antonio, Texas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Trujillo, P.A.; Anderson, K.D.

    2007-07-01

    This paper describes the challenges behind the implementation of the characterization, remediation, and the Site Closure for three 91b Radioactive Wastes under a Performance Based Contract at Lackland Air Force Base, San Antonio, Texas. The Defense Environmental Restoration Program (DERP) was established by Section 211 of the Superfund Amendments and Reauthorization Act of 1986 (SARA). A part of the DERP provides for the cleanup of hazardous substances associated with past Department of Defense (DoD) activities and is consistent with the provisions of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA). It is the Air Force Installation Restoration Program (IRP)more » that has responsibility for the cleanup activities associated with CERCLA. Under contract to the Air Force Center for Environmental Excellence (AFCEE), the ECC Project Team, that included ECC, Cabrera Services, and Malcolm Pirnie, was responsible for the implementation of the actions at three sites. The three IRP (91b) sites included RW015, a 0.02 square kilometer (5.5 acre) site, RW017 a 0.003 square kilometer (0.9 acre) site, and RW033 an 0.356 square kilometer (88 acre) site. Adding to the complexities of the project were issues of archaeological areas of interest, jurisdictional wetlands, land open to hunting, issues of security as well as compliance to the myriad of air force base rules, regulations, and Air Force Instructions (AFI). The award of the project task order was July of 2005, the project plan phase started in July of 2005 followed by the remedy implementation that included characterization and remediation as required reached completion in June of 2006. The project closure including the development and approval final status survey reports, proposed plans, and decision documents that parallel the CERCLA process was initiated in June of 2006 and is expected to reach completion in August of 2007. This paper will focus on the issues of working to achieve

  3. SUPERFUND INNOVATIVE TECHNOLOGY EVALUATION PROGRAM ANNUAL REPORT TO CONGRESS FY 1995

    EPA Science Inventory

    The Superfund Innovative Technology Evaluation (SITE) Program was established more than nine years ago to encourage the development and implementation of innovative treatment technologies for hazardous waste site remediation. Development of this program was in direct response to ...

  4. RC2S: A Cognitive Remediation Program to Improve Social Cognition in Schizophrenia and Related Disorders

    PubMed Central

    Peyroux, Elodie; Franck, Nicolas

    2014-01-01

    In people with psychiatric disorders, particularly those suffering from schizophrenia and related illnesses, pronounced difficulties in social interactions are a key manifestation. These difficulties can be partly explained by impairments in social cognition, defined as the ability to understand oneself and others in the social world, which includes abilities such as emotion recognition, theory of mind (ToM), attributional style, and social perception and knowledge. The impact of several kinds of interventions on social cognition has been studied recently. The best outcomes in the area of social cognition in schizophrenia are those obtained by way of cognitive remediation programs. New strategies and programs in this line are currently being developed, such as RC2S (cognitive remediation of social cognition) in Lyon, France. Considering that the social cognitive deficits experienced by patients with schizophrenia are very diverse, and that the main objective of social cognitive remediation programs is to improve patients’ functioning in their daily social life, RC2S was developed as an individualized and flexible program that allows patients to practice social interaction in a realistic environment through the use of virtual reality techniques. In the RC2S program, the patient’s goal is to assist a character named Tom in various social situations. The underlying idea for the patient is to acquire cognitive strategies for analyzing social context and emotional information in order to understand other characters’ mental states and to help Tom manage his social interactions. In this paper, we begin by presenting some data regarding the social cognitive impairments found in schizophrenia and related disorders, and we describe how these deficits are targeted by social cognitive remediation. Then we present the RC2S program and discuss the advantages of computer-based simulation to improve social cognition and social functioning in people with psychiatric disorders

  5. Remedial Action Assessment System: A computer-based methodology for conducting feasibility studies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    White, M.K.; Buelt, J.L.; Stottlemyre, J.A.

    1991-02-01

    Because of the complexity and number of potential waste sites facing the US Department of Energy (DOE) for potential cleanup, DOE is supporting the development of a computer-based methodology to streamline the remedial investigation/feasibility study process. The Remedial Action Assessment System (RAAS), can be used for screening, linking, and evaluating established technology processes in support of conducting feasibility studies. It is also intended to do the same in support of corrective measures studies. The user interface employs menus, windows, help features, and graphical information while RAAS is in operation. Object-oriented programming is used to link unit processes into sets ofmore » compatible processes that form appropriate remedial alternatives. Once the remedial alternatives are formed, the RAAS methodology can evaluate them in terms of effectiveness, implementability, and cost. RAAS will access a user-selected risk assessment code to determine the reduction of risk after remedial action by each recommended alternative. The methodology will also help determine the implementability of the remedial alternatives at a site and access cost estimating tools to provide estimates of capital, operating, and maintenance costs. This paper presents the characteristics of two RAAS prototypes currently being developed. These include the RAAS Technology Information System, which accesses graphical, tabular and textual information about technologies, and the main RAAS methodology, which screens, links, and evaluates remedial technologies. 4 refs., 3 figs., 1 tab.« less

  6. Microwave remediation of electronic circuitry waste and the resulting gaseous emissions

    NASA Astrophysics Data System (ADS)

    Schulz, Rebecca L.

    The global community has become increasingly dependent on computer and electronic technology. As a result, society is faced with an increasing amount of obsolete equipment and electronic circuitry waste. Electronic waste is generally disposed of in landfills. While convenient, this action causes a substantial loss of finite resources and poses an environmental threat as the circuit board components breakdown and are exposed to the elements. Hazardous compounds such as lead, mercury and cadmium may leach from the circuitry and find their way into the groundwater supply. For this dissertation, a microwave waste remediation system was developed. The system was designed to remove the organic components from a wide variety of electronic circuitry. Upon additional heating of the resulting ash material in an industrial microwave, a glass and metal product can be recovered. Analysis of the metal reveals the presence of precious metals (gold, silver) that can be sold to provide a return on investment. a glass and metal product can be recovered. Analysis of the metal reveals the presence of precious metals (gold, silver) that can be sold to provide a return on investment. Gaseous organic compounds that were generated as a result of organic removal were treated in a microwave off gas system that effectively reduced the concentration of the products emitted by several orders of magnitude, and in some cases completely destroying the waste gas. Upon further heating in an industrial microwave, a glass and metal product were recovered. In order to better understand the effects of processing parameters on the efficiency of the off-gas system, a parametric study was developed. The study tested the microwave system at 3 flow rates (10, 30, and 50 ft 3/min) and three temperatures (400, 700 and 1000°C. In order to test the effects of microwave energy, the experiments were repeated using a conventional furnace. While microwave energy is widely used, the mechanisms of interaction with

  7. Anthropology and decision making about chronic technological disasters: Mixed waste remediation on the Oak Ridge Reservation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wolfe, A.K.; Schweitzer, M.

    This paper discusses two related case studies of decision making about the remediation of mixed (hazardous and radioactive) wastes on the Oak Ridge Reservation in Tennessee. The three goals of the paper are to (1) place current decision-making efforts in the varied and evolving social, political, regulatory, economic, and technological contexts in which they occur; (2) present definitions and attributes of {open_quotes}successful{close_quotes} environmental decision making from the perspectives of key constituency groups that participate in decision making; and (3) discuss the role of anthropology in addressing environmental decision making. Environmental decision making about remediation is extraordinarily complex, involving human healthmore » and ecological risks; uncertainties about risks, technological ability to clean up, the financial costs of clean up; multiple and sometimes conflicting regulations; social equity and justice considerations; and decreasing budgets. Anthropological theories and methods can contribute to better understanding and, potentially, to better decision making.« less

  8. A Program on Hazardous Waste Management.

    ERIC Educational Resources Information Center

    Kummler, Ralph H.; And Others

    1989-01-01

    Provides an overview of the "Hazardous Waste Management Graduate Certificate" program at Wayne State University. Describes four required courses and nine optional courses. Discusses the development of a Master program and the curriculum of the Master program. (YP)

  9. Process for remediation of plastic waste

    DOEpatents

    Pol, Vilas G [Westmont, IL; Thiyagarajan, Pappannan [Germantown, MD

    2012-04-10

    A single step process for degrading plastic waste by converting the plastic waste into carbonaceous products via thermal decomposition of the plastic waste by placing the plastic waste into a reactor, heating the plastic waste under an inert or air atmosphere until the temperature of 700.degree. C. is achieved, allowing the reactor to cool down, and recovering the resulting decomposition products therefrom. The decomposition products that this process yields are carbonaceous materials, and more specifically egg-shaped and spherical-shaped solid carbons. Additionally, in the presence of a transition metal compound, this thermal decomposition process produces multi-walled carbon nanotubes.

  10. Electrodialytic remediation of municipal solid waste incineration residues using different membranes.

    PubMed

    Parés Viader, Raimon; Jensen, Pernille Erland; Ottosen, Lisbeth M

    2017-02-01

    In the present work, three different commercial membrane brands were used in an identical electrodialytic cell setup and operating conditions, in order to reduce the leaching of metals and salt anions of two types of municipal solid waste incineration residues: air pollution control residues of a semi-dry flue-gas cleaning system and fly ashes from a plant with wet flue-gas cleaning system. The results showed a general reduction of the leaching in both residues after ED remediation. For the following elements, the leaching was found to be different after ED treatment depending on the membrane used, with statistical significance: • Air pollution control residues of the semi-dry flue-gas cleaning system: Cr, Cu, Ni, Pb, Zn; • Fly ashes from a plant with wet flue-gas cleaning system: Al, Ba, Cu, Ni, Zn, Cl, SO 4 . Final leaching values for some elements and membranes, but not the majority, were below than those of certified coal fly ash (e.g. Al or Cr), a material which is commonly used in construction materials; at the same time, some of these values were reduced to below the Danish law thresholds on the use of contaminated soil in constructions. These results show the potential of ED as a technology to upgrade municipal solid waste incineration residues. Copyright © 2016 Elsevier Ltd. All rights reserved.

  11. Remediation of problematic residents--A national survey.

    PubMed

    Bhatti, Nasir I; Ahmed, Aadil; Stewart, Michael G; Miller, Robert H; Choi, Sukgi S

    2016-04-01

    Despite careful selection processes, residency programs face the challenge of training residents who fall below minimal performance standards. Poor performance of a resident can endanger both patient safety and the reputation of the residency program. It is important, therefore, for a program to identify such residents and implement strategies for their successful remediation. The purpose of our study was to gather information on evaluation and remediation strategies employed by different otolaryngology programs. Cross-sectional survey. We conducted a national survey, sending a questionnaire to the program directors of 106 otolaryngology residency programs. We collected information on demographics of the program, identification of problematic residents, and remediation strategies. The response rate was 74.5%, with a 2% cumulative incidence of problematic residents in otolaryngology programs during the past 10 years. The most frequently reported deficiencies of problematic residents were unprofessional behavior with colleagues/staff (38%), insufficient medical knowledge (37%), and poor clinical judgment (34%). Personal or professional stress was the most frequently identified underlying problem (70.5%). Remediation efforts included general counseling (78%), frequent feedback sessions (73%), assignment of a mentor (58%), and extra didactics (47%). These remediation efforts failed to produce improvement in 23% of the identified residents, ultimately leading to their dismissal. The apparent deficiencies, underlying causes, and remediation strategies vary among otolaryngology residency programs. Based on the results of this survey, we offer recommendations for the early identification of problematic residents and a standardized remediation plan. NA. © 2015 The American Laryngological, Rhinological and Otological Society, Inc.

  12. Documents About the Approval to Dispose of Less than 50 Parts Per Million (ppm) PCB Remediation Waste Issued to National Rural Electric Cooperative Association (NRECA) Members

    EPA Pesticide Factsheets

    Documents About the Approval to Dispose of Less than 50 Parts Per Million (ppm) Polychlorinated Biphenyl (PCB) Remediation Waste Issued to National Rural Electric Cooperative Association (NRECA) Members

  13. Environmental Remediation to Address Childhood Lead Poisoning Epidemic due to Artisanal Gold Mining in Zamfara, Nigeria.

    PubMed

    Tirima, Simba; Bartrem, Casey; von Lindern, Ian; von Braun, Margrit; Lind, Douglas; Anka, Shehu Mohammed; Abdullahi, Aishat

    2016-09-01

    From 2010 through 2013, integrated health and environmental responses addressed an unprecedented epidemic lead poisoning in Zamfara State, northern Nigeria. Artisanal gold mining caused widespread contamination resulting in the deaths of > 400 children. Socioeconomic, logistic, and security challenges required remediation and medical protocols within the context of local resources, labor practices, and cultural traditions. Our aim was to implement emergency environmental remediation to abate exposures to 17,000 lead poisoned villagers, to facilitate chelation treatment of children ≤ 5 years old, and to establish local technical capacity and lead health advocacy programs to prevent future disasters. U.S. hazardous waste removal protocols were modified to accommodate local agricultural practices. Remediation was conducted over 4 years in three phases, progressing from an emergency response by international personnel to comprehensive cleanup funded and accomplished by the Nigerian government. More than 27,000 m3 of contaminated soils and mining waste were removed from 820 residences and ore processing areas in eight villages, largely by hand labor, and disposed in constructed landfills. Excavated areas were capped with clean soils (≤ 25 mg/kg lead), decreasing soil lead concentrations by 89%, and 2,349 children received chelation treatment. Pre-chelation geometric mean blood lead levels for children ≤ 5 years old decreased from 149 μg/dL to 15 μg/dL over the 4-year remedial program. The unprecedented outbreak and response demonstrate that, given sufficient political will and modest investment, the world's most challenging environmental health crises can be addressed by adapting proven response protocols to the capabilities of host countries. Tirima S, Bartrem C, von Lindern I, von Braun M, Lind D, Anka SM, Abdullahi A. 2016. Environmental remediation to address childhood lead poisoning epidemic due to artisanal gold mining in Zamfara, Nigeria. Environ Health

  14. Waste certification program plan for Oak Ridge National Laboratory. Revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1997-09-01

    This document defines the waste certification program (WCP) developed for implementation at Oak Ridge National Laboratory (ORNL). The document describes the program structure, logic, and methodology for certification of ORNL wastes. The purpose of the WCP is to provide assurance that wastes are properly characterized and that the Waste Acceptance Criteria (WAC) for receiving facilities are met. The program meets the waste certification requirements for mixed (both radioactive and hazardous) and hazardous [including polychlorinated biphenyls (PCB)] waste. Program activities will be conducted according to ORNL Level 1 document requirements.

  15. Process for remediation of plastic waste

    DOEpatents

    Pol, Vilas G; Thiyagarajan, Pappannan

    2013-11-12

    A single step process for degrading plastic waste by converting the plastic waste into carbonaceous products via thermal decomposition of the plastic waste by placing the plastic waste into a reactor, heating the plastic waste under an inert or air atmosphere until the temperature of about 700.degree. C. is achieved, allowing the reactor to cool down, and recovering the resulting decomposition products therefrom. The decomposition products that this process yields are carbonaceous materials, and more specifically carbon nanotubes having a partially filled core (encapsulated) adjacent to one end of the nanotube. Additionally, in the presence of a transition metal compound, this thermal decomposition process produces multi-walled carbon nanotubes.

  16. Chemical and microbial remediation of hexavalent chromium from contaminated soil and mining/metallurgical solid waste: a review.

    PubMed

    Dhal, B; Thatoi, H N; Das, N N; Pandey, B D

    2013-04-15

    Chromium is a highly toxic non-essential metal for microorganisms and plants, and its occurrence is rare in nature. Lower to higher chromium containing effluents and solid wastes released by activities such as mining, metal plating, wood preservation, ink manufacture, dyes, pigments, glass and ceramics, tanning and textile industries, and corrosion inhibitors in cooling water, induce pollution and may cause major health hazards. Besides, natural processes (weathering and biochemical) also contribute to the mobility of chromium which enters in to the soil affecting the plant growth and metabolic functions of the living species. Generally, chemical processes are used for Cr- remediation. However, with the inference derived from the diverse Cr-resistance mechanism displayed by microorganisms and the plants including biosorption, diminished accumulation, precipitation, reduction of Cr(VI) to Cr(III), and chromate efflux, bioremediation is emerging as a potential tool to address the problem of Cr(VI) pollution. This review focuses on the chemistry of chromium, its use, and toxicity and mobility in soil, while assessing its concentration in effluents/wastes which becomes the source of pollution. In order to conserve the environment and resources, the chemical/biological remediation processes for Cr(VI) and their efficiency have been summarised in some detail. The interaction of chromium with various microbial/bacterial strains isolated and their reduction capacity towards Cr(VI) are also discussed. Copyright © 2013 Elsevier B.V. All rights reserved.

  17. Scheduling the Remediation of Port Hope: Logistical and Regulatory Challenges of a Multiple Site Urban Remediation Project - 13119

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ferguson Jones, Andrea; Lee, Angela; Palmeter, Tim

    2013-07-01

    The Port Hope Project is part of the larger CAN$1.28 billion Port Hope Area Initiative (PHAI), a community-based program for the development and implementation of a safe, local, long-term management solution for historic Low-Level Radioactive Waste (LLRW) in the Municipalities of Port Hope and Clarington, Ontario, Canada. Atomic Energy of Canada (AECL) is the Project Proponent, Public Works and Government Services (PWGSC) is managing the procurement of services and the MMM Group Limited - Conestoga Rovers and Associates Joint Venture (MMM-CRA Joint Venture) is providing detailed design and construction oversight and administration services for the Project. The Port Hope Projectmore » includes the construction of a long-term waste management facility (LTWMF) in the Municipality of Port Hope and the remediation of 18 (eighteen) large-scale LLRW, numerous small-scale sites still being identified and industrial sites within the Municipality. The total volume to be remediated is over one million cubic metres and will come from sites that include temporary storage sites, ravines, beaches, parks, private commercial and residential properties and vacant industrial sites all within the urban area of Port Hope. Challenges that will need to be overcome during this 10 year project include: - Requirements stipulated by the Environmental Assessment (EA) that affect Project logistics and schedule. - Coordination of site remediation with the construction schedule at the LTWMF. - Physical constraints on transport routes and at sites affecting production rates. - Despite being an urban undertaking, seasonal constrains for birds and fish (i.e., nesting and spawning seasons). - Municipal considerations. - Site-specific constraints. - Site interdependencies exist requiring consideration in the schedule. Several sites require the use of an adjacent site for staging. (authors)« less

  18. Niagara Falls Storage Site environmental report for calendar year 1992, 1397 Pletcher Road, Lewiston, New York. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-05-01

    This report describes the environmental surveillance program at the Niagara Falls Storage Site (NFSS) and provides the results for 1992. From 1944 to the present, the primary use of NFSS has been storage of radioactive residues produced as a by-product of uranium production. All onsite areas of residual radioactivity above guidelines have been remediated. Materials generated during remediation are stored onsite in the 4-ha (10-acre) waste containment structure (WCS). The WCS is a clay-lined, clay-capped, and grass-covered storage pile. The environmental surveillance program at NFSS includes sampling networks for radon concentrations in air; external gamma radiation exposure; and total uraniummore » and radium-226 concentrations in surface water, sediments, and groundwater. Several chemical parameters, including seven metals, are also routinely measured in groundwater. This surveillance program assists in fulfilling the DOE policy of measuring and monitoring effluents from DOE activities and calculating hypothetical doses. Monitoring results are compared with applicable Environmental Protection Agency (EPA) and New York State Department of Environmental Conservation (NYSDEC) standards, DOE derived concentration guides (DCGs), dose limits, and other DOE requirements. Results of environmental monitoring during 1992 indicate that levels of the parameters measured were in compliance with all but one requirement: Concentrations of iron and manganese in groundwater were above NYSDEC groundwater quality standards. However, these elements occur naturally in the soils and groundwater associated with this region. In 1992 there were no environmental occurrences or reportable quantity releases.« less

  19. New tailor-made bio-organoclays for the remediation of olive mill waste water

    NASA Astrophysics Data System (ADS)

    Calabrese, Ilaria; Gelardi, Giulia; Merli, Marcello; Rytwo, Giora; Sciascia, Luciana; Liria Turco Liveri, Maria

    2013-12-01

    A systematic study aimed at obtaining new organoclays for the treatment of Olive Mill Waste water (OMW) has been performed. Several organoclays have been prepared by loading different amounts of the biocompatible surfactant Tween20 onto the K10 montmorillonite (MMT). Complementary kinetic and equilibrium studies on the adsorption of the Tween20 onto the MMT have been carried out and the characterization of the new tailor-made bio-materials has been performed by means of the XRD and FT-IR measurements. Finally the prepared bio-organoclays have been successfully applied for the OMW remediation and they proved to be highly effective in decreasing the organic content (OC) to an extent that depends on both the amount of loaded surfactant and the experimental protocols applied.

  20. The Effectiveness of a High School Mathematics Remediation Program on Student Achievement

    ERIC Educational Resources Information Center

    Kingsborough, Joseph

    2011-01-01

    The landmark educational reform legislation known as the No Child Left Behind Act (2001) brought sweeping change to the educational establishment through clearly defined learning goals and equally clear consequences for poorly performing schools. The present study sought to determine the impact of a remediation program in mathematics at a suburban…

  1. CONCEPTUAL BASIS FOR NATURAL ATTENUATION (NA) AS REMEDIATION APPROACH

    EPA Science Inventory

    As used in enforcement actions at hazardous waste sites by U.S. EPA, monitored natural attenuation is a remedy fully equivalent to any other remedy. The acceptance of MNA is based on three lines of evidence: historical ground water and/or soil chemistry data that demonstrates a ...

  2. The University of Georgia Chemical Waste Disposal Program.

    ERIC Educational Resources Information Center

    Dreesen, David W.; Pohlman, Thomas J.

    1980-01-01

    Describes a university-wide program directed at reducing the improper storage and disposal of toxic chemical wastes from laboratories. Specific information is included on the implementation of a waste pick-up service, safety equipment, materials and methods for packaging, and costs of the program. (CS)

  3. United States Air Force 611th Air Support Group/Civil Engineering Squadron Elmendorf AFB, Alaska. Remedial investigation and feasibility study. Bullen Point Radar Installation, Alaska. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Karmi, S.

    1996-03-18

    The United States Air Force (Air Force) has prepared this Remedial investigation/Feasibility Study (RI/FS) report as part of the Installation Restoration Program (IRP) to present results of RI/FS activities at five sites at the Bullen Point radar installation. The IRP provides for investigating, quantifying, and remediating environmental contamination from past waste management activities at Air Force installations throughout the United States.

  4. Environmental assessment and management of metal-rich wastes generated in acid mine drainage passive remediation systems.

    PubMed

    Macías, Francisco; Caraballo, Manuel A; Nieto, José Miguel

    2012-08-30

    As acid mine drainage (AMD) remediation is increasingly faced by governments and mining industries worldwide, the generation of metal-rich solid residues from the treatments plants is concomitantly raising. A proper environmental management of these metal-rich wastes requires a detailed characterization of the metal mobility as well as an assessment of this new residues stability. The European standard leaching test EN 12457-2, the US EPA TCLP test and the BCR sequential extraction procedure were selected to address the environmental assessment of dispersed alkaline substrate (DAS) residues generated in AMD passive treatment systems. Significant discrepancies were observed in the hazardousness classification of the residues according to the TCLP or EN 12457-2 test. Furthermore, the absence of some important metals (like Fe or Al) in the regulatory limits employed in both leaching tests severely restricts their applicability for metal-rich wastes. The results obtained in the BCR sequential extraction suggest an important influence of the landfill environmental conditions on the metals released from the wastes. To ensure a complete stability of the pollutants in the studied DAS-wastes the contact with water or any other leaching solutions must be avoided and a dry environment needs to be provided in the landfill disposal selected. Copyright © 2012 Elsevier B.V. All rights reserved.

  5. Scaled-up remediation of CCA-treated wood

    Treesearch

    Carol A. Clausen; William R. Kenealy

    2004-01-01

    Bioremediation is a novel approach to recycling waste wood treated with chromated copper arsenate (CCA). Remediating CCA-treated waste wood diverts this fiber source from our landfills and provides tangible secondary products from the cleaned fiber. On a laboratory scale, this method, which utilizes oxalic acid extraction and bioleaching with a metal- tolerant...

  6. State of the Science Review: Potential for Beneficial Use of Waste By-Products for In-situ Remediation of Metal-Contaminated Soil and Sediment

    EPA Science Inventory

    Metal and metalloid contamination of soil and sediment is a widespread problem both in urban and rural areas throughout the United States (U.S. EPA, 2014). Beneficial use of waste by-products as amendments to remediate metal-contaminated soils and sediments can provide major eco...

  7. Australian Waste Wise Schools Program: Its Past, Present, and Future

    ERIC Educational Resources Information Center

    Cutter-Mackenzie, Amy

    2010-01-01

    The Waste Wise Schools program has a longstanding history in Australia. It is an action-based program that encourages schools to move toward zero waste through their curriculum and operating practices. This article provides a review of the program, finding that it has had notable success in reducing schools' waste through a "reduce, reuse,…

  8. A systematic assessment of the state of hazardous waste clean-up technologies. Quarterly technical progress report, April 1--June 30, 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berg, M.T.; Reed, B.E.; Gabr, M.

    1993-07-01

    West Virginia University (WVU) and the US DOE Morgantown Energy Technology Center (METC) entered into a Cooperative Agreement on August 29, 1992 entitled ``Decontamination Systems Information and Research Programs.`` Stipulated within the Agreement is the requirement that WVU submit to METC a series of Technical Progress Report for Year 1 of the Agreement. This report reflects the progress and/or efforts performed on the following nine technical projects encompassed by the Year 1 Agreement for the period of April 1 through June 30, 1993: Systematic assessment of the state of hazardous waste clean-up technologies; site remediation technologies -- drain-enhanced soil flushingmore » (DESF) for organic contaminants removal; site remediation technologies -- in situ bioremediation of organic contaminants; excavation systems for hazardous waste sites; chemical destruction of polychlorinated biphenyls; development of organic sensors -- monolayer and multilayer self-assembled films for chemical sensors; Winfield lock and dam remediation; Assessments of Technologies for hazardous waste site remediation -- non-treatment technologies and pilot scale test facility implementation; and remediation of hazardous sites with stream reforming.« less

  9. WASTE RESEARCH STRATEGY

    EPA Science Inventory

    The Waste Research Strategy covers research necessary to support both the proper management of solid and hazardous wastes and the effective remediation of contaminated waste sites. This research includes improving the assessment of existing environmental risks, as well as develop...

  10. The 100-C-7 Remediation Project. An Overview of One of DOE's Largest Remediation Projects - 13260

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Post, Thomas C.; Strom, Dean; Beulow, Laura

    The U.S. Department of Energy Richland Operations Office (RL), U.S. Environmental Protection Agency (EPA) and Washington Closure Hanford LLC (WCH) completed remediation of one of the largest waste sites in the U.S. Department of Energy complex. The waste site, 100-C-7, covers approximately 15 football fields and was excavated to a depth of 85 feet (groundwater). The project team removed a total of 2.3 million tons of clean and contaminated soil, concrete debris, and scrap metal. 100-C-7 lies in Hanford's 100 B/C Area, home to historic B and C Reactors. The waste site was excavated in two parts as 100-C-7 andmore » 100-C-7:1. The pair of excavations appear like pit mines. Mining engineers were hired to design their tiered sides, with safety benches every 17 feet and service ramps which allowed equipment access to the bottom of the excavations. The overall cleanup project was conducted over a span of almost 10 years. A variety of site characterization, excavation, load-out and sampling methodologies were employed at various stages of remediation. Alternative technologies were screened and evaluated during the project. A new method for cost effectively treating soils was implemented - resulting in significant cost savings. Additional opportunities for minimizing waste streams and recycling were identified and effectively implemented by the project team. During the final phase of cleanup the project team applied lessons learned throughout the entire project to address the final, remaining source of chromium contamination. The C-7 cleanup now serves as a model for remediating extensive deep zone contamination sites at Hanford. (authors)« less

  11. Approaches to systematic assessment of environmental exposures posed at hazardous waste sites in the developing world: the Toxic Sites Identification Program.

    PubMed

    Ericson, Bret; Caravanos, Jack; Chatham-Stephens, Kevin; Landrigan, Philip; Fuller, Richard

    2013-02-01

    In the developing world, environmental chemical exposures due to hazardous waste sites are poorly documented. We describe the approach taken by the Blacksmith Institute's Toxic Sites Identification Program in documenting environmental chemical exposures due to hazardous waste sites globally, identifying sites of concern and quantifying pathways, populations, and severity of exposure. A network of local environmental investigators was identified and trained to conduct hazardous waste site investigations and assessments. To date, 2,095 contaminated sites have been identified within 47 countries having an estimated population at risk of 71,500,000. Trained researchers and investigators have visited 1,400 of those sites. Heavy metals are the leading primary exposures, with water supply and ambient air being the primary routes of exposure. Even though chemical production has occurred largely in the developed world to date, many hazardous waste sites in the developing world pose significant hazards to the health of large portions of the population. Further research is needed to quantify potential health and economic consequences and identify cost-effective approaches to remediation.

  12. Improving Hazardous Waste Remediation and Restoration Decisions Using Ecosystem Services

    EPA Science Inventory

    Hazardous site management in the US includes remediation of contaminated environmental media and restoration of injured natural resources. Site remediation decisions are informed by ecological risk assessment (ERA), while restoration and compensation decisions are informed by the...

  13. Plasma filtering techniques for nuclear waste remediation

    DOE PAGES

    Gueroult, Renaud; Hobbs, David T.; Fisch, Nathaniel J.

    2015-04-24

    Nuclear waste cleanup is challenged by the handling of feed stocks that are both unknown and complex. Plasma filtering, operating on dissociated elements, offers advantages over chemical methods in processing such wastes. The costs incurred by plasma mass filtering for nuclear waste pretreatment, before ultimate disposal, are similar to those for chemical pretreatment. However, significant savings might be achieved in minimizing the waste mass. As a result, this advantage may be realized over a large range of chemical waste compositions, thereby addressing the heterogeneity of legacy nuclear waste.

  14. Plasma filtering techniques for nuclear waste remediation.

    PubMed

    Gueroult, Renaud; Hobbs, David T; Fisch, Nathaniel J

    2015-10-30

    Nuclear waste cleanup is challenged by the handling of feed stocks that are both unknown and complex. Plasma filtering, operating on dissociated elements, offers advantages over chemical methods in processing such wastes. The costs incurred by plasma mass filtering for nuclear waste pretreatment, before ultimate disposal, are similar to those for chemical pretreatment. However, significant savings might be achieved in minimizing the waste mass. This advantage may be realized over a large range of chemical waste compositions, thereby addressing the heterogeneity of legacy nuclear waste. Copyright © 2015 Elsevier B.V. All rights reserved.

  15. 40 CFR 257.28 - Implementation of the corrective action program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-Hazardous Waste Disposal Units Ground-Water Monitoring and Corrective Action § 257.28 Implementation of the... ground-water monitoring program that: (i) At a minimum, meets the requirements of an assessment monitoring program under § 257.25; (ii) Indicates the effectiveness of the corrective action remedy; and (iii...

  16. Integrated management of organic wastes for remediation of massive tailings storage facilities under semiarid mediterranean climate type: efficacy of organic pork residues as study case

    NASA Astrophysics Data System (ADS)

    Ginocchio, Rosanna; Arellano, Eduardo; España, Helena; Gardeweg, Rosario; Bas, Fernando; Gandarillas, Mónica

    2016-04-01

    Remediation of large surface areas of massive mine wastes, such as tailings storage facilities (TSFs) is challenging, particularly when no topsoils have been stored for the mine closure stage. Worldwide, it has been demonstrated that the use of organic wastes as substrate amendments for remediation of hard rock mine wastes is a useful alternative to topsoils material. In the case of semi-arid climate conditions of north-central Chile, the copper mining industry has generated massive TSF (between 400 ha and 3,000 ha) which needs now to be properly closed according to recently established mine closure regulations. However, in most of the cases, there have been no topsoils savage that facilitate the initial stage of the site remediation. Industrial organic wastes (i.e. biosolids) are found in the area, but their availability is normally below the demand needed for remediation of TSFs and salt content is normally elevated, thus posing salinization risks to the substrate and negative plant growth. We focused on a large organic waste producing industry, the pork industry, whose growth has been restricted due to the limited possibilities for using pig slurries as amendments for croplands in north-central Chile and the strong odor generated, resulting in conflicts with local communities. Incorporation of pig slurries as amendments to post-operative TSFs has been scarcely evaluated at international level (i.e. Spain) and no evaluation at all exists for the solid organic fraction generated from pig slurry treatment plants (PSTP). In the present study, we evaluated the efficacy of both pig slurries (PS) and the solid fraction of PSTP (SF-PSTP) as tailings amendment for creating good plant productivity on TSFs located under semi-arid Mediterranean climate conditions in north-central Chile. A short-term greenhouse study was developed. Copper mine tailings were mixed either with PS (0, 40, 80, and 120 m3 ha-1) or SF-PSTP (0, 25, 50 and 75 t ha-1), distributed in 3 L pots, and

  17. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    In FY 1990 Robotics Technology Development Program (RTDP) planning teams visited five DOE sites. These sites were selected by the Office of Technology Development to provide a needs basis for developing a 5-Year Plan. Visits to five DOE sites provided identification of needs for robotics technology development to support Environmental Restoration and Waste Management (ER WM) projects at those sites. Additional site visits will be conducted in the future to expand the planning basis. This volume summarizes both the results of the site visits and the needs and requirements of the priority ER WM activities at the sites, including potentialmore » needs for robotics and remote systems technology. It also discusses hazards associated with the site activities and any problems or technical uncertainties associated with dealing with the hazards in the performance of the ER WM work. Robotic or remote systems currently under development for remediation projects or waste operations are also discussed. The information in this document is organized principally by site, activity, and priority. Section 2.0, Site Needs, is based on information from the site visit reports and provides a summary which focuses on the site needs and requirements for each priority activity. Section 2.0 also records evaluations and discussions by the RTDP team following the site visit. Section 3.0, Commonality Assessment, documents similar site needs where common, or cross-cutting, robotics technology might be applied to several activities. Section 4.0 contains a summary of the site needs and requirements in tabular form. 1 tab.« less

  18. Radioactive waste management in the Chernobyl exclusion zone: 25 years since the Chernobyl nuclear power plant accident.

    PubMed

    Oskolkov, Boris Y; Bondarkov, Mikhail D; Zinkevich, Lubov I; Proskura, Nikolai I; Farfán, Eduardo B; Jannik, G Timothy

    2011-10-01

    Radioactive waste management is an important component of the Chernobyl Nuclear Power Plant accident mitigation and remediation activities in the so-called Chernobyl Exclusion Zone. This article describes the localization and characteristics of the radioactive waste present in the Chernobyl Exclusion Zone and summarizes the pathways and strategy for handling the radioactive waste-related problems in Ukraine and the Chernobyl Exclusion Zone and, in particular, the pathways and strategies stipulated by the National Radioactive Waste Management Program.

  19. 32 CFR 310.45 - Administrative remedies.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 2 2011-07-01 2011-07-01 false Administrative remedies. 310.45 Section 310.45 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED) PRIVACY PROGRAM DOD PRIVACY PROGRAM Privacy Act Violations § 310.45 Administrative remedies. Any individual who...

  20. Solid phase bio-electrofermentation of food waste to harvest value-added products associated with waste remediation.

    PubMed

    Chandrasekhar, K; Amulya, K; Mohan, S Venkata

    2015-11-01

    A novel solid state bio-electrofermentation system (SBES), which can function on the self-driven bioelectrogenic activity was designed and fabricated in the laboratory. SBES was operated with food waste as substrate and evaluated for simultaneous production of electrofuels viz., bioelectricity, biohydrogen (H2) and bioethanol. The system illustrated maximum open circuit voltage and power density of 443 mV and 162.4 mW/m(2), respectively on 9 th day of operation while higher H2 production rate (21.9 ml/h) was observed on 19th day of operation. SBES system also documented 4.85% w/v bioethanol production on 20th day of operation. The analysis of end products confirmed that H2 production could be generally attributed to a mixed acetate/butyrate-type of fermentation. Nevertheless, the presence of additional metabolites in SBES, including formate, lactate, propionate and ethanol, also suggested that other metabolic pathways were active during the process, lowering the conversion of substrate into H2. SBES also documented 72% substrate (COD) removal efficiency along with value added product generation. Continuous evolution of volatile fatty acids as intermediary metabolites resulted in pH drop and depicted its negative influence on SBES performance. Bio-electrocatalytic analysis was carried out to evaluate the redox catalytic capabilities of the biocatalyst. Experimental data illustrated that solid-state fermentation can be effectively integrated in SBES for the production of value added products with the possibility of simultaneous solid waste remediation. Copyright © 2015 Elsevier Ltd. All rights reserved.

  1. Performance Assessment Program for the Savannah River Site Liquid Waste Facilities - 13610

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rosenberger, Kent H.

    2013-07-01

    The Liquid Waste facilities at the U.S. Department of Energy's (DOE) Savannah River Site (SRS) are operated by Liquid Waste Operations contractor Savannah River Remediation LLC (SRR). A separate Performance Assessment (PA) is prepared to support disposal operations at the Saltstone Disposal Facility and closure evaluations for the two liquid waste tank farm facilities at SRS, F-Tank Farm and H-Tank Farm. A PA provides the technical basis and results to be used in subsequent documents to demonstrate compliance with the pertinent requirements identified in operations and closure regulatory guidance. The Saltstone Disposal Facility is subject to a State of Southmore » Carolina industrial solid waste landfill permit and the tank farms are subject to a state industrial waste water permit. The three Liquid Waste facilities are also subject to a Federal Facility Agreement approved by the State, DOE and the Environmental Protection Agency (EPA). Due to the regulatory structure, a PA is a key technical document reviewed by the DOE, the State of South Carolina and the EPA. As the waste material disposed of in the Saltstone Disposal Facility and the residual material in the closed tank farms is also subject to reclassification prior to closure via a waste determination pursuant to Section 3116 of the Ronald W. Reagan National Defense Authorization Act of Fiscal Year 2005, the U.S. Nuclear Regulatory Commission (NRC) is also a reviewing agency for the PAs. Pursuant to the Act, the NRC also has a continuing role to monitor disposal actions to assess compliance with stated performance objectives. The Liquid Waste PA program at SRS represents a continual process over the life of the disposal and closure operations. When the need for a PA or PA revision is identified, the first step is to develop a conceptual model to best represent the facility conditions. The conceptual model will include physical dimensions of the closed system, both the engineered and natural system, and

  2. "Diamond in the Rough": The Impact of a Remedial Program on College Access and Opportunity for Black Males at an Historically Black Institution

    ERIC Educational Resources Information Center

    Palmer, Robert T.; Davis, Ryan J.

    2012-01-01

    Researchers, policymakers, and administrations have shown great concern over the efficacy of college remediation, which has prompted some states to eliminate remedial programs from public 4-year institutions. However, research suggests that eliminating these programs may have unintended consequences on college access and opportunity for…

  3. Solid Waste Program technical baseline description

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carlson, A.B.

    1994-07-01

    The system engineering approach has been taken to describe the technical baseline under which the Solid Waste Program is currently operating. The document contains a mission analysis, function analysis, system definition, documentation requirements, facility and project bases, and uncertainties facing the program.

  4. The analysis of the program to develop the Nuclear Waste Management System: Allocated requirements for the Office of Civilian Radioactive Waste Management Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Woods, T.W.

    1991-09-01

    This report is volume 3, part B, of the program to satisfy the allocated requirements of the Office of Civilian Radioactive Waste Management Program, in the development of the nuclear waste management system. The report is divided into the following sections: regulatory compliance; external relations; international programs; strategic and contingency planning; contract business management; and administrative services. (CS)

  5. 40 CFR 761.345 - Form of the waste to be sampled.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Characterization for PCB Disposal in Accordance With § 761.62, and Sampling PCB Remediation Waste Destined for Off... waste and PCB remediation waste destined for off-site disposal must be in the form of either flattened...

  6. Focused Board Intervention (FBI): A Remediation Program for Written Board Preparation and the Medical Knowledge Core Competency.

    PubMed

    Visconti, Annette; Gaeta, Theodore; Cabezon, Michael; Briggs, William; Pyle, Matthew

    2013-09-01

    Residents deemed at risk for low performance on standardized examinations require focused attention and remediation. To determine whether a remediation program for residents identified as at risk for failure on the Emergency Medicine (EM) Written Board Examination is associated with improved outcomes. All residents in 8 classes of an EM 1-3 program were assessed using the In-Training Examination. Residents enrolled in the Focused Board Intervention (FBI) remediation program based on an absolute score on the EM 3 examination of <70% or a score more than 1 SD below the national mean on the EM 1 or 2 examination. Individualized education plans (IEPs) were created for residents in the FBI program, combining self-study audio review lectures with short-answer examinations. The association between first-time pass rate for the American Board of Emergency Medicine (ABEM) Written Qualifying Examination (WQE) and completion of all IEPs was examined using the χ(2) test. Of the 64 residents graduating and sitting for the ABEM examination between 2000 and 2008, 26 (41%) were eligible for the program. Of these, 10 (38%) residents were compliant and had a first-time pass rate of 100%. The control group (12 residents who matched criteria but graduated before the FBI program was in place and 4 who were enrolled but failed to complete the program) had a 44% pass rate (7 of 16), which was significantly lower (χ(2)  =  8.6, P  =  .003). The probability of passing the ABEM WQE on the first attempt was improved through the completion of a structured IEP.

  7. WIPP waste characterization program sampling and analysis guidance manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-01-01

    The Waste Isolation Pilot Plant (WIPP) Waste Characterization Program Sampling and Analysis Guidance Manual (Guidance Manual) provides a unified source of information on the sampling and analytical techniques that enable Department of Energy (DOE) facilities to comply with the requirements established in the current revision of the Quality Assurance Program Plan (QAPP) for the WIPP Experimental-Waste Characterization Program (the Program). This Guidance Manual includes all of the sampling and testing methodologies accepted by the WIPP Project Office (DOE/WPO) for use in implementing the Program requirements specified in the QAPP. This includes methods for characterizing representative samples of transuranic (TRU) wastesmore » at DOE generator sites with respect to the gas generation controlling variables defined in the WIPP bin-scale and alcove test plans, as well as waste container headspace gas sampling and analytical procedures to support waste characterization requirements under the WIPP test program and the Resource Conservation and Recovery Act (RCRA). The procedures in this Guidance Manual are comprehensive and detailed and are designed to provide the necessary guidance for the preparation of site specific procedures. The use of these procedures is intended to provide the necessary sensitivity, specificity, precision, and comparability of analyses and test results. The solutions to achieving specific program objectives will depend upon facility constraints, compliance with DOE Orders and DOE facilities' operating contractor requirements, and the knowledge and experience of the TRU waste handlers and analysts. With some analytical methods, such as gas chromatography/mass spectrometry, the Guidance Manual procedures may be used directly. With other methods, such as nondestructive/destructive characterization, the Guidance Manual provides guidance rather than a step-by-step procedure.« less

  8. ANNUAL RADIOACTIVE WASTE TANK INSPECTION PROGRAM- 2007

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    West, B; Ruel Waltz, R

    2008-06-05

    Aqueous radioactive wastes from Savannah River Site (SRS) separations and vitrification processes are contained in large underground carbon steel tanks. The 2007 inspection program revealed that the structural integrity and waste confinement capability of the Savannah River Site waste tanks were maintained. A very small amount of material had seeped from Tank 12 from a previously identified leaksite. The material observed had dried on the tank wall and did not reach the annulus floor. A total of 5945 photographs were made and 1221 visual and video inspections were performed during 2007. Additionally, ultrasonic testing was performed on four Waste Tanksmore » (15, 36, 37 and 38) in accordance with approved inspection plans that met the requirements of WSRC-TR-2002- 00061, Revision 2 'In-Service Inspection Program for High Level Waste Tanks'. The Ultrasonic Testing (UT) In-Service Inspections (ISI) are documented in a separate report that is prepared by the ISI programmatic Level III UT Analyst. Tanks 15, 36, 37 and 38 are documented in 'Tank Inspection NDE Results for Fiscal Year 2007'; WSRC-TR-2007-00064.« less

  9. INNOVATIVE FOSSIL FUEL FIRED VITRIFICATION TECHNOLOGY FOR SOIL REMEDIATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    J. Hnat; L.M. Bartone; M. Pineda

    2001-07-13

    This Summary Report summarizes the progress of Phases 3, 3A and 4 of a waste technology Demonstration Project sponsored under a DOE Environmental Management Research and Development Program and administered by the U.S. Department of Energy National Energy Technology Laboratory-Morgantown (DOE-NETL) for an ''Innovative Fossil Fuel Fired Vitrification Technology for Soil Remediation''. The Summary Reports for Phases 1 and 2 of the Program were previously submitted to DOE. The total scope of Phase 3 was to have included the design, construction and demonstration of Vortec's integrated waste pretreatment and vitrification process for the treatment of low level waste (LLW), TSCA/LLWmore » and mixed low-level waste (MLLW). Due to funding limitations and delays in the project resulting from a law suit filed by an environmental activist and the extended time for DOE to complete an Environmental Assessment for the project, the scope of the project was reduced to completing the design, construction and testing of the front end of the process which consists of the Material Handling and Waste Conditioning (MH/C) Subsystem of the vitrification plant. Activities completed under Phases 3A and 4 addressed completion of the engineering, design and documentation of the Material Handling and Conditioning System such that final procurement of the remaining process assemblies can be completed and construction of a Limited Demonstration Project be initiated in the event DOE elects to proceed with the construction and demonstration testing of the MH/C Subsystem.« less

  10. In-situ groundwater remediation by selective colloid mobilization

    DOEpatents

    Seaman, J.C.; Bertch, P.M.

    1998-12-08

    An in-situ groundwater remediation pump and treat technique is described which is effective for reclamation of aquifers that have been contaminated with a mixed, metal-containing waste, and which promotes selective mobilization of metal oxide colloids with a cationic surfactant, preferably a quaternary alkylammonium surfactant, without significantly reducing formation permeability that often accompanies large-scale colloid dispersion, thus increasing the efficiency of the remediation effort by enhancing the capture of strongly sorbing contaminants associated with the oxide phases. The resulting suspension can be separated from the bulk solution with controlled pH adjustments to destabilize the oxide colloids, and a clear supernatant which results that can be recycled through the injection well without further waste treatment. 3 figs.

  11. In-situ groundwater remediation by selective colloid mobilization

    DOEpatents

    Seaman, John C.; Bertch, Paul M.

    1998-01-01

    An in-situ groundwater remediation pump and treat technique effective for reclamation of aquifers that have been contaminated with a mixed, metal-containing waste, which promotes selective mobilization of metal oxide colloids with a cationic surfactant, preferably a quaternary alkylammonium surfactant, without significantly reducing formation permeability that often accompanies large-scale colloid dispersion, thus increasing the efficiency of the remediation effort by enhancing the capture of strongly sorbing contaminants associated with the oxide phases. The resulting suspension can be separated from the bulk solution with controlled pH adjustments to destabilize the oxide colloids, and a clear supernatant which results that can be recycled through the injection well without further waste treatment.

  12. Remediation in the Context of the Competencies: A Survey of Pediatrics Residency Program Directors

    PubMed Central

    Riebschleger, Meredith P.; Haftel, Hilary M.

    2013-01-01

    Background The 6 competencies defined by the Accreditation Council for Graduate Medical Education provide the framework of assessment for trainees in the US graduate medical education system, but few studies have investigated their impact on remediation. Methods We obtained data via an anonymous online survey of pediatrics residency program directors. For the purposes of the survey, remediation was defined as “any form of additional training, supervision, or assistance above that required for a typical resident.” Respondents were asked to quantify 3 groups of residents: (1) residents requiring remediation; (2) residents whose training was extended for remediation purposes; and (3) residents whose training was terminated owing to issues related to remediation. For each group, the proportion of residents with deficiencies in each of the 6 competencies was calculated. Results In all 3 groups, deficiencies in medical knowledge and patient care were most common; deficiencies in professionalism and communication were moderately common; and deficiencies in systems-based practice and practice-based learning and improvement were least common. Residents whose training was terminated were more likely to have deficiencies in multiple competencies. Conclusion Although medical knowledge and patient care are reported most frequently, deficiencies in any of the 6 competencies can lead to the need for remediation in pediatrics residents. Residents who are terminated are more likely to have deficits in multiple competencies. It will be critical to develop and refine tools to measure achievement in all 6 competencies as the graduate medical education community may be moving further toward individualized training schedules and competency-based, rather than time-based, training. PMID:24404228

  13. Developing a strategy and closure criteria for radioactive and mixed waste sites in the ORNL remedial action program: Regulatory interface

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Trabalka, J.R.

    1987-09-01

    Some options for stabilization and treatment of contaminated sites can theoretically provide a once-and-for-all solution (e.g., removal or destruction of contaminants). Most realizable options, however, leave contaminants in place (in situ), potentially isolated by physical or chemical, but more typically, by hydrologic measures. As a result of the dynamic nature of the interactions between contaminants, remedial measures, and the environment, in situ stablization measures are likely to have limited life spans, and maintenance and monitoring of performance become an essential part of the scheme. The length of formal institutional control over the site and related questions about future uses ofmore » the land and waters are of paramount importance. Unique features of the ORNL site and environs appear to be key ingredients in achieving the very long term institutional control necessary for successful financing and implementation of in situ stabilization. Some formal regulatory interface is necessary to ensure that regulatory limitations and new guidance which can affect planning and implementation of the ORNL Remedial Action Program are communicated to ORNL staff and potential technical and financial limitations which can affect schedules or alternatives for achievement of long-term site stabilization and the capability to meet environmental regulations are provided to regulatory bodies as early as possible. Such an interface should allow decisions on closure criteria to be based primarily on technical merit and protection of human health and the environment. A plan for interfacing with federal and state regulatory authorities is described. 93 refs., 1 fig., 4 tabs.« less

  14. ANNUAL RADIOACTIVE WASTE TANK INSPECTION PROGRAM 2010

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    West, B.; Waltz, R.

    Aqueous radioactive wastes from Savannah River Site (SRS) separations and vitrification processes are contained in large underground carbon steel tanks. Inspections made during 2010 to evaluate these vessels and other waste handling facilities along with evaluations based on data from previous inspections are the subject of this report. The 2010 inspection program revealed that the structural integrity and waste confinement capability of the Savannah River Site waste tanks were maintained. All inspections scheduled per SRR-LWE-2009-00138, HLW Tank Farm Inspection Plan for 2010, were completed. Ultrasonic measurements (UT) performed in 2010 met the requirements of C-ESG-00006, In-Service Inspection Program for Highmore » Level Waste Tanks, Rev. 3, and WSRC-TR-2002-00061, Rev.6. UT inspections were performed on Tanks 30, 31 and 32 and the findings are documented in SRNL-STI-2010-00533, Tank Inspection NDE Results for Fiscal Year 2010, Waste Tanks 30, 31 and 32. A total of 5824 photographs were made and 1087 visual and video inspections were performed during 2010. Ten new leaksites at Tank 5 were identified in 2010. The locations of these leaksites are documented in C-ESR-G-00003, SRS High Level Waste Tank Leaksite Information, Rev.5. Ten leaksites at Tank 5 were documented during tank wall/annulus cleaning activities. None of these new leaksites resulted in a release to the environment. The leaksites were documented during wall cleaning activities and the waste nodules associated with the leaksites were washed away. Previously documented leaksites were reactivated at Tank 12 during waste removal activities.« less

  15. Biological technologies for the remediation of co-contaminated soil.

    PubMed

    Ye, Shujing; Zeng, Guangming; Wu, Haipeng; Zhang, Chang; Dai, Juan; Liang, Jie; Yu, Jiangfang; Ren, Xiaoya; Yi, Huan; Cheng, Min; Zhang, Chen

    2017-12-01

    Compound contamination in soil, caused by unreasonable waste disposal, has attracted increasing attention on a global scale, particularly since multiple heavy metals and/or organic pollutants are entering natural ecosystem through human activities, causing an enormous threat. The remediation of co-contaminated soil is more complicated and difficult than that of single contamination, due to the disparate remediation pathways utilized for different types of pollutants. Several modern remediation technologies have been developed for the treatment of co-contaminated soil. Biological remediation technologies, as the eco-friendly methods, have received widespread concern due to soil improvement besides remediation. This review summarizes the application of biological technologies, which contains microbial technologies (function microbial remediation and composting or compost addition), biochar, phytoremediation technologies, genetic engineering technologies and biochemical technologies, for the remediation of co-contaminated soil with heavy metals and organic pollutants. Mechanisms of these technologies and their remediation efficiencies are also reviewed. Based on this study, this review also identifies the future research required in this field.

  16. HANDBOOK: APPROACHES FOR REMEDIATION OF ...

    EPA Pesticide Factsheets

    This publication was developed by the Center for Environmental Research Information (CERI), Office of Research and Development, of the U.S. Environmental Protection Agency (EPA). The information in the document is based primarily on presentations at two technology transfer seminar series: Technologies for Remediating Sites Contaminated with Explosive and Radioactive Wastes, sponsored jointly by EPA and the U.S. Department of Defense (DOD) in spring and summer 1993; and Radioactive Site Remediation, sponsored by EPA and the Department of Energy (DOE) in summer 1992. Additional information has been provided by technical experts from EPA, DOD, DOE, academia, and private industry. present information

  17. Effectiveness of a self-regulated remedial program for handwriting difficulties.

    PubMed

    Van Waelvelde, Hilde; De Roubaix, Amy; Steppe, Lien; Troubleyn, Evy; De Mey, Barbara; Dewitte, Griet; Debrabant, Julie; Van de Velde, Dominique

    2017-09-01

    Handwriting difficulties may have pervasive effects on a child's school performance. I Can! is a remedial handwriting program with a focus on self-regulated learning and applying motor learning principles combined with a behavioural approach. It is developed for typically developing children with handwriting problems. The study aim was to evaluate the program's effectiveness. Thirty-one children aged 7-8 year participated in a cross-over study. Handwriting quality and speed were repeatedly assessed by means of the Systematic Screening of Handwriting Difficulties test. Difficulties addressed were fluency in letter formation, fluency in letter connections, letter height, regularity of letter height, space between words, and line path. Mixed model analysis revealed improved quality of writing and speed for all children but significantly more improvement in handwriting quality for the children participating in the program. Although writing speed improved over time, no additional effects of the program occurred. 'I Can!' is found to be an effective instructive program to ameliorate handwriting quality in typically developing children with handwriting difficulties. The program's success was by a therapy burst of only 7 weeks focusing on the child's self-regulated learning capacities, within an individualized education plan according to their needs and goals.

  18. 34 CFR 682.413 - Remedial actions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false Remedial actions. 682.413 Section 682.413 Education... Education Loan Programs by a Guaranty Agency § 682.413 Remedial actions. (a)(1) The Secretary requires a... actions against a guaranty agency or third-party servicer administering any aspect of the FFEL programs...

  19. 40 CFR 85.2107 - Warranty remedy.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 18 2010-07-01 2010-07-01 false Warranty remedy. 85.2107 Section 85... Voluntary Aftermarket Part Certification Program § 85.2107 Warranty remedy. (a) The manufacturer's... Emissions Performance Warranty, the manufacturer shall be liable for the total cost of the remedy for any...

  20. 40 CFR 85.2107 - Warranty remedy.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 18 2011-07-01 2011-07-01 false Warranty remedy. 85.2107 Section 85... Voluntary Aftermarket Part Certification Program § 85.2107 Warranty remedy. (a) The manufacturer's... Emissions Performance Warranty, the manufacturer shall be liable for the total cost of the remedy for any...

  1. Environmental Remediation to Address Childhood Lead Poisoning Epidemic due to Artisanal Gold Mining in Zamfara, Nigeria

    PubMed Central

    Tirima, Simba; Bartrem, Casey; von Lindern, Ian; von Braun, Margrit; Lind, Douglas; Anka, Shehu Mohammed; Abdullahi, Aishat

    2016-01-01

    Background: From 2010 through 2013, integrated health and environmental responses addressed an unprecedented epidemic lead poisoning in Zamfara State, northern Nigeria. Artisanal gold mining caused widespread contamination resulting in the deaths of > 400 children. Socioeconomic, logistic, and security challenges required remediation and medical protocols within the context of local resources, labor practices, and cultural traditions. Objectives: Our aim was to implement emergency environmental remediation to abate exposures to 17,000 lead poisoned villagers, to facilitate chelation treatment of children ≤ 5 years old, and to establish local technical capacity and lead health advocacy programs to prevent future disasters. Methods: U.S. hazardous waste removal protocols were modified to accommodate local agricultural practices. Remediation was conducted over 4 years in three phases, progressing from an emergency response by international personnel to comprehensive cleanup funded and accomplished by the Nigerian government. Results: More than 27,000 m3 of contaminated soils and mining waste were removed from 820 residences and ore processing areas in eight villages, largely by hand labor, and disposed in constructed landfills. Excavated areas were capped with clean soils (≤ 25 mg/kg lead), decreasing soil lead concentrations by 89%, and 2,349 children received chelation treatment. Pre-chelation geometric mean blood lead levels for children ≤ 5 years old decreased from 149 μg/dL to 15 μg/dL over the 4-year remedial program. Conclusions: The unprecedented outbreak and response demonstrate that, given sufficient political will and modest investment, the world’s most challenging environmental health crises can be addressed by adapting proven response protocols to the capabilities of host countries. Citation: Tirima S, Bartrem C, von Lindern I, von Braun M, Lind D, Anka SM, Abdullahi A. 2016. Environmental remediation to address childhood lead poisoning epidemic

  2. 78 FR 20073 - Adequacy of Oregon's Municipal Solid Waste Landfill Permit Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-03

    ...] Adequacy of Oregon's Municipal Solid Waste Landfill Permit Program AGENCY: Environmental Protection Agency... Oregon's approved Municipal Solid Waste Landfill Program. On March 22, 2004, EPA issued final regulations... Oregon's Municipal Solid Waste Landfill permit program to allow for Research, Development, and...

  3. GENERAL METHODS FOR REMEDIAL PERFORMANCE EVALUATIONS

    EPA Science Inventory

    This document was developed by an EPA-funded project to explain technical considerations and principles necessary to evaluated the performance of ground-water contamination remediations at hazardous waste sites. This is neither a "cookbook", nor an encyclopedia of recommended fi...

  4. A Framework for Remediating Number Combination Deficits

    ERIC Educational Resources Information Center

    Fuchs, Lynn S.; Powell, Sarah R.; Seethaler, Pamela M.; Fuchs, Douglas; Hamlett, Carol L.; Cirino, Paul T.; Fletcher, Jack M.

    2010-01-01

    This article introduces a framework for the remediation of number combination (NC) deficits. Research on the remediation of NC deficits is summarized, and research program studies are used to illustrate the 3 approaches to remediation. The Framework comprises a 2-stage system of remediation. The less intensive stage implementing 1 of 3…

  5. Clean option: An alternative strategy for Hanford Tank Waste Remediation. Volume 2, Detailed description of first example flowsheet

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Swanson, J.L.

    1993-09-01

    Disposal of high-level tank wastes at the Hanford Site is currently envisioned to divide the waste between two principal waste forms: glass for the high-level waste (HLW) and grout for the low-level waste (LLW). The draft flow diagram shown in Figure 1.1 was developed as part of the current planning process for the Tank Waste Remediation System (TWRS), which is evaluating options for tank cleanup. The TWRS has been established by the US Department of Energy (DOE) to safely manage the Hanford tank wastes. It includes tank safety and waste disposal issues, as well as the waste pretreatment and wastemore » minimization issues that are involved in the ``clean option`` discussed in this report. This report describes the results of a study led by Pacific Northwest Laboratory to determine if a more aggressive separations scheme could be devised which could mitigate concerns over the quantity of the HLW and the toxicity of the LLW produced by the reference system. This aggressive scheme, which would meet NRC Class A restrictions (10 CFR 61), would fit within the overall concept depicted in Figure 1.1; it would perform additional and/or modified operations in the areas identified as interim storage, pretreatment, and LLW concentration. Additional benefits of this scheme might result from using HLW and LLW disposal forms other than glass and grout, but such departures from the reference case are not included at this time. The evaluation of this aggressive separations scheme addressed institutional issues such as: radioactivity remaining in the Hanford Site LLW grout, volume of HLW glass that must be shipped offsite, and disposition of appropriate waste constituents to nonwaste forms.« less

  6. Early predictors of need for remediation in the Australian general practice training program: a retrospective cohort study.

    PubMed

    Magin, Parker; Stewart, Rebecca; Turnock, Allison; Tapley, Amanda; Holliday, Elizabeth; Cooling, Nick

    2017-10-01

    Underperforming trainees requiring remediation may threaten patient safety and are challenging for vocational training programs. Decisions to institute remediation are high-stakes-remediation being resource-intensive and emotionally demanding on trainees. Detection of underperformance requiring remediation is particularly problematic in general (family) practice. We sought to establish early-training assessment instruments predictive of general practice (GP) trainees' subsequently requiring formal remediation. We conducted a retrospective cohort study of trainees from a large Australian regionally-based GP training organization. The outcome factor was requirement for formal remediation. Independent variables were demographic factors and a range of formative assessments conducted immediately prior to or during early-stage training. Analyses employed univariate and multivariate logistic regression of each predictor assessment modality with the outcome, adjusting for potential confounders. Of 248 trainees, 26 (10.5 %) required formal remediation. Performance on the Colleague Feedback Evaluation Tool (entailing feedback from a trainee's clinical colleagues on clinical performance, communication and probity) and External Clinical Teaching Visits (half-day sessions of the trainee's clinical consultations observed directly by an experienced GP), along with non-Australian primary medical qualification, were significantly associated with requiring remediation. There was a non-significant trend for association with performance on the Doctors Interpersonal Skills Questionnaire (patient feedback on interpersonal elements of the consultation). There were no significant associations with entry-selection scores or formative exam or assessment scores. Our finding that 'in vivo' assessments of complex behaviour, but not 'in vitro' knowledge-based assessments, predict need for remediation is consistent with theoretical understanding of the nature of remediation decision-making and

  7. 77 FR 46994 - Oklahoma: Incorporation by Reference of State Hazardous Waste Management Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-07

    ... State regulations that are authorized and that the EPA will enforce under the Solid Waste Disposal Act...: Incorporation by Reference of State Hazardous Waste Management Program AGENCY: Environmental Protection Agency... ``Approved State Hazardous Waste Management Programs'', Oklahoma's authorized hazardous waste program. The...

  8. 77 FR 29275 - Oklahoma: Incorporation by Reference of State Hazardous Waste Management Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-17

    ... State regulations that are authorized and that the EPA will enforce under the Solid Waste Disposal Act...: Incorporation by Reference of State Hazardous Waste Management Program AGENCY: Environmental Protection Agency... ``Approved State Hazardous Waste Management Programs'', Oklahoma's authorized hazardous waste program. The...

  9. 75 FR 36609 - Oklahoma: Incorporation by Reference of State Hazardous Waste Management Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-28

    ...: Incorporation by Reference of State Hazardous Waste Management Program AGENCY: Environmental Protection Agency... ``Approved State Hazardous Waste Management Programs'', Oklahoma's authorized hazardous waste program. The... State regulations that are authorized and that the EPA will enforce under the Solid Waste Disposal Act...

  10. Apparatus and method for extraction of chemicals from aquifer remediation effluent water

    DOEpatents

    McMurtrey, Ryan D.; Ginosar, Daniel M.; Moor, Kenneth S.; Shook, G. Michael; Moses, John M.; Barker, Donna L.

    2002-01-01

    An apparatus and method for extraction of chemicals from an aquifer remediation aqueous effluent are provided. The extraction method utilizes a critical fluid for separation and recovery of chemicals employed in remediating aquifers contaminated with hazardous organic substances, and is particularly suited for separation and recovery of organic contaminants and process chemicals used in surfactant-based remediation technologies. The extraction method separates and recovers high-value chemicals from the remediation effluent and minimizes the volume of generated hazardous waste. The recovered chemicals can be recycled to the remediation process or stored for later use.

  11. Method and system for extraction of chemicals from aquifer remediation effluent water

    DOEpatents

    McMurtrey, Ryan D.; Ginosar, Daniel M.; Moor, Kenneth S.; Shook, G. Michael; Barker, Donna L.

    2003-01-01

    A method and system for extraction of chemicals from an groundwater remediation aqueous effluent are provided. The extraction method utilizes a critical fluid for separation and recovery of chemicals employed in remediating groundwater contaminated with hazardous organic substances, and is particularly suited for separation and recovery of organic contaminants and process chemicals used in surfactant-based remediation technologies. The extraction method separates and recovers high-value chemicals from the remediation effluent and minimizes the volume of generated hazardous waste. The recovered chemicals can be recycled to the remediation process or stored for later use.

  12. Engineering Options Assessment Report. Nitrate Salt Waste Stream Processing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anast, Kurt Roy

    2015-11-13

    This report examines and assesses the available systems and facilities considered for carrying out remediation activities on remediated nitrate salt (RNS) and unremediated nitrate salt (UNS) waste containers at Los Alamos National Laboratory (LANL). The assessment includes a review of the waste streams consisting of 60 RNS, 29 above-ground UNS, and 79 candidate below-ground UNS containers that may need remediation. The waste stream characteristics were examined along with the proposed treatment options identified in the Options Assessment Report . Two primary approaches were identified in the five candidate treatment options discussed in the Options Assessment Report: zeolite blending and cementation.more » Systems that could be used at LANL were examined for housing processing operations to remediate the RNS and UNS containers and for their viability to provide repackaging support for remaining LANL legacy waste.« less

  13. Engineering Options Assessment Report: Nitrate Salt Waste Stream Processing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anast, Kurt Roy

    2015-11-18

    This report examines and assesses the available systems and facilities considered for carrying out remediation activities on remediated nitrate salt (RNS) and unremediated nitrate salt (UNS) waste containers at Los Alamos National Laboratory (LANL). The assessment includes a review of the waste streams consisting of 60 RNS, 29 aboveground UNS, and 79 candidate belowground UNS containers that may need remediation. The waste stream characteristics were examined along with the proposed treatment options identified in the Options Assessment Report . Two primary approaches were identified in the five candidate treatment options discussed in the Options Assessment Report: zeolite blending and cementation.more » Systems that could be used at LANL were examined for housing processing operations to remediate the RNS and UNS containers and for their viability to provide repackaging support for remaining LANL legacy waste.« less

  14. The Department of Energy`s Remedial Action Assessment System (RAAS): Decision support tools for performing streamlined feasibility studies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    White, M.K.

    1994-06-01

    The United States Department of Energy (DOE) faces the major task of cleaning up hundreds of waste sites across the nation, which will require completion of a large number of remedial investigation/feasibility studies (RI/FSs). The intent of each RI/FS is to characterize the waste problems and environmental conditions at the operable unit level, segment the remediation problem into manageable medium-specific and contaminant-specific pieces, define corresponding remediation objectives, and identify remedial response actions to satisfy those objectives. The RI/FS team can then identify combinations of remediation technologies that will meet the remediation objectives. Finally, the team must evaluate these remedial alternativesmore » in terms of effectiveness, implementability, cost, and acceptability. The Remedial Action Assessment System (RAAS) is being developed by Pacific Northwest Laboratory (PNL) to support DOE in this effort.« less

  15. Chemical Waste and Allied Products.

    PubMed

    Hung, Yung-Tse; Aziz, Hamidi Abdul; Ramli, Siti Fatihah; Yeh, Ruth Yu-Li; Liu, Lian-Huey; Huhnke, Christopher Robert

    2016-10-01

    This review of literature published in 2015 focuses on waste related to chemical and allied products. The topics cover the waste management, physicochemical treatment, aerobic granular, aerobic waste treatment, anaerobic granular, anaerobic waste treatment, chemical waste, chemical wastewater, fertilizer waste, fertilizer wastewater, pesticide wastewater, pharmaceutical wastewater, ozonation. cosmetics waste, groundwater remediation, nutrient removal, nitrification denitrification, membrane biological reactor, and pesticide waste.

  16. 77 FR 59879 - Idaho: Incorporation by Reference of Approved State Hazardous Waste Management Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-01

    ...: Incorporation by Reference of Approved State Hazardous Waste Management Program AGENCY: Environmental Protection... ``Approved State Hazardous Waste Management Programs,'' Idaho's authorized hazardous waste program. The EPA... Federal Register, the EPA is codifying and incorporating by reference the State's hazardous waste program...

  17. Remediation: Higher Education's Bridge to Nowhere

    ERIC Educational Resources Information Center

    Complete College America, 2012

    2012-01-01

    The intentions were noble. It was hoped that remediation programs would be an academic bridge from poor high school preparation to college readiness. Sadly, remediation has become instead higher education's "Bridge to Nowhere." This broken remedial bridge is travelled by some 1.7 million beginning students each year, most of whom will…

  18. 34 CFR 682.413 - Remedial actions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 4 2011-07-01 2011-07-01 false Remedial actions. 682.413 Section 682.413 Education... Federal Family Education Loan Programs by a Guaranty Agency § 682.413 Remedial actions. (a)(1) The... take one or more of the following remedial actions against a guaranty agency or third-party servicer...

  19. Reusing remediated CCA-treated wood

    Treesearch

    Carol A. Clausen

    2003-01-01

    Options for recycling and reusing chromated-copper-arsenate- (CCA) treated material include dimensional lumber and round wood size reduction, composites, and remediation. Size reduction by remilling, shaving, or resawing CCA-treated wood reduces the volume of landfilled waste material and provides many options for reusing used treated wood. Manufacturing composite...

  20. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Honeyman, J.O.

    1998-01-09

    This Management Assessment of Tank Waste Remediation System (TWRS) Contractor Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technicalmore » Baselines, work breakdown structures, tank farms organizational structure and configurations, work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on-line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined.« less

  1. Program Planning Concepts in Solid Waste Management

    ERIC Educational Resources Information Center

    Brown, Sanford M., Jr.

    1972-01-01

    Presents a brief review of the program planning process, and uses the example of a solid waste program to illustrate what has or has not been accomplished through the use of the planning process. (LK)

  2. TRU Waste Management Program cost/schedule optimization analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.

    1985-10-01

    The cost/schedule optimization task is a necessary function to insure that program goals and plans are optimized from a cost and schedule aspect. Results of this study will offer DOE information with which it can establish, within institutional constraints, the most efficient program for the long-term management and disposal of contact handled transuranic waste (CH-TRU). To this end, a comprehensive review of program cost/schedule tradeoffs has been made, to identify any major cost saving opportunities that may be realized by modification of current program plans. It was decided that all promising scenarios would be explored, and institutional limitations to implementationmore » would be described. Since a virtually limitless number of possible scenarios can be envisioned, it was necessary to distill these possibilities into a manageable number of alternatives. The resultant scenarios were described in the cost/schedule strategy and work plan document. Each scenario was compared with the base case: waste processing at the originating site; transport of CH-TRU wastes in TRUPACT; shipment of drums in 6-Packs; 25 year stored waste workoff; WIPP operational 10/88, with all sites shipping to WIPP beginning 10/88; and no processing at WIPP. Major savings were identified in two alternate scenarios: centralize waste processing at INEL and eliminate rail shipment of TRUPACT. No attempt was made to calculate savings due to combination of scenarios. 1 ref., 5 figs., 1 tab. (MHB)« less

  3. Land Application of Wastes: An Educational Program - Introduction and Script.

    ERIC Educational Resources Information Center

    Clarkson, W. W.; And Others

    This is the introductory module to the Land Application of Wastes educational program. The module contains information on the content, structure, and dynamics of the program. Also included with the module is a script to accompany a slide presentation. The Land Application of Wastes program consists of twenty-five modules and audio-visual…

  4. ANNUAL RADIOACTIVE WASTE TANK INSPECTION PROGRAM 2009

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    West, B.; Waltz, R.

    2010-06-21

    Aqueous radioactive wastes from Savannah River Site (SRS) separations and vitrification processes are contained in large underground carbon steel tanks. Inspections made during 2009 to evaluate these vessels and other waste handling facilities along with evaluations based on data from previous inspections are the subject of this report. The 2009 inspection program revealed that the structural integrity and waste confinement capability of the Savannah River Site waste tanks were maintained. All inspections scheduled per LWO-LWE-2008-00423, HLW Tank Farm Inspection Plan for 2009, were completed. All Ultrasonic measurements (UT) performed in 2009 met the requirements of C-ESG-00006, In-Service Inspection Program formore » High Level Waste Tanks, Rev. 1, and WSRC-TR-2002-00061, Rev.4. UT inspections were performed on Tank 29 and the findings are documented in SRNL-STI-2009-00559, Tank Inspection NDE Results for Fiscal Year 2009, Waste Tank 29. Post chemical cleaning UT measurements were made in Tank 6 and the results are documented in SRNL-STI-2009-00560, Tank Inspection NDE Results Tank 6, Including Summary of Waste Removal Support Activities in Tanks 5 and 6. A total of 6669 photographs were made and 1276 visual and video inspections were performed during 2009. Twenty-Two new leaksites were identified in 2009. The locations of these leaksites are documented in C-ESR-G-00003, SRS High Level Waste Tank Leaksite Information, Rev.4. Fifteen leaksites at Tank 5 were documented during tank wall/annulus cleaning activities. Five leaksites at Tank 6 were documented during tank wall/annulus cleaning activities. Two new leaksites were identified at Tank 19 during waste removal activities. Previously documented leaksites were reactivated at Tanks 5 and 12 during waste removal activities. Also, a very small amount of additional leakage from a previously identified leaksite at Tank 14 was observed.« less

  5. 40 CFR 761.345 - Form of the waste to be sampled.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Characterization for PCB Disposal in Accordance With § 761.62, and Sampling PCB Remediation Waste Destined for Off-Site Disposal, in Accordance With § 761.61 § 761.345 Form of the waste to be sampled. PCB bulk product waste and PCB remediation waste destined for off-site disposal must be in the form of either flattened...

  6. Sustainable exposure prevention through innovative detection and remediation technologies from the NIEHS Superfund Research Program.

    PubMed

    Henry, Heather F; Suk, William A

    2017-03-01

    Innovative devices and tools for exposure assessment and remediation play an integral role in preventing exposure to hazardous substances. New solutions for detecting and remediating organic, inorganic, and mixtures of contaminants can improve public health as a means of primary prevention. Using a public health prevention model, detection and remediation technologies contribute to primary prevention as tools to identify areas of high risk (e.g. contamination hotspots), to recognize hazards (bioassay tests), and to prevent exposure through contaminant cleanups. Primary prevention success is ultimately governed by the widespread acceptance of the prevention tool. And, in like fashion, detection and remediation technologies must convey technical and sustainability advantages to be adopted for use. Hence, sustainability - economic, environmental, and societal - drives innovation in detection and remediation technology. The National Institute of Health (NIH) National Institute of Environmental Health Sciences (NIEHS) Superfund Research Program (SRP) is mandated to advance innovative detection, remediation, and toxicity screening technology development through grants to universities and small businesses. SRP recognizes the importance of fast, accurate, robust, and advanced detection technologies that allow for portable real-time, on-site characterization, monitoring, and assessment of contaminant concentration and/or toxicity. Advances in non-targeted screening, biological-based assays, passive sampling devices (PSDs), sophisticated modeling approaches, and precision-based analytical tools are making it easier to quickly identify hazardous "hotspots" and, therefore, prevent exposures. Innovation in sustainable remediation uses a variety of approaches: in situ remediation; harnessing the natural catalytic properties of biological processes (such as bioremediation and phytotechnologies); and application of novel materials science (such as nanotechnology, advanced

  7. ANNUAL RADIOACTIVE WASTE TANK INSPECTION PROGRAM - 2011

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    West, B.; Waltz, R.

    2012-06-21

    Aqueous radioactive wastes from Savannah River Site (SRS) separations and vitrification processes are contained in large underground carbon steel tanks. Inspections made during 2011 to evaluate these vessels and other waste handling facilities along with evaluations based on data from previous inspections are the subject of this report. The 2011 inspection program revealed that the structural integrity and waste confinement capability of the Savannah River Site waste tanks were maintained. All inspections scheduled per SRR-LWE-2011-00026, HLW Tank Farm Inspection Plan for 2011, were completed. Ultrasonic measurements (UT) performed in 2011 met the requirements of C-ESR-G-00006, In-Service Inspection Program for Highmore » Level Waste Tanks, Rev. 3, and WSRC-TR-2002-00061, Rev.6. UT inspections were performed on Tanks 25, 26 and 34 and the findings are documented in SRNL-STI-2011-00495, Tank Inspection NDE Results for Fiscal Year 2011, Waste Tanks 25, 26, 34 and 41. A total of 5813 photographs were made and 835 visual and video inspections were performed during 2011. A potential leaksite was discovered at Tank 4 during routine annual inspections performed in 2011. The new crack, which is above the allowable fill level, resulted in no release to the environment or tank annulus. The location of the crack is documented in C-ESR-G-00003, SRS High Level Waste Tank Leaksite Information, Rev.6.« less

  8. Waste Minimization Program. Air Force Plant 6.

    DTIC Science & Technology

    1986-02-01

    coolant’s life, it can cause the formation of gummy residues on machines and parts and cause corrosion of the machine and work tools . i 3-91e 0 _ b-4 LA...2-9 3.0 Waste Minimization Program, AFP 6 3-1 3.1 Machine Coolant Waste 3-1 3.2 Engine Oil and Hydraulic Fluid Waste 3-12 3.3 Paint Sludge 3-14 3.4...Incineration 3-54 LIST OF FIGURES Figure Page 3-1 Annual Machine Coolant Use 3-5 n 3-2 oily Industrial Waste Treatment System 3-7 3-3 Schematic of Paint

  9. A pilot outreach program for small quantity generators of hazardous waste.

    PubMed Central

    Brown, M S; Kelley, B G; Gutensohn, J

    1988-01-01

    The Massachusetts Department of Environmental Management initiated a pilot project to improve compliance with hazardous waste regulations and management of hazardous wastes with auto body shops around the state. The program consisted of mass mailings, a series of workshops throughout the state, a coordinated inspection program by the state regulatory agency, and technology transfer. At the start of the program in January 1986, approximately 650 of the estimated 2,350 auto body shops in the state had notified EPA of their waste generating activities; by January 1987, approximately 1,200 shops had done so. Suggestions for improving program efforts include tailoring the outreach effort to the industry, government-sponsored research and development directed at the needs of small firms, mandatory participation in hazardous waste transportation programs, and better coordination by EPA of its information collection and distribution program. PMID:3421393

  10. Hanford Site Groundwater Protection Management Program: Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    Groundwater protection is a national priority that is promulgated in a variety of environmental regulations at local, state, and federal levels. To effectively coordinate and ensure compliance with applicable regulations, the US Department of Energy has issued DOE Order 5400.1 (now under revision) that requires all US Department of Energy facilities to prepare separate groundwater protection program descriptions and plans. This document describes the Groundwater Protection Management Program for the Hanford Site located in the state of Washington. DOE Order 5400.1 specifies that the Groundwater Protection Management Program cover the following general topical areas: (1) documentation of the groundwater regime,more » (2) design and implementation of a groundwater monitoring program to support resource management and comply with applicable laws and regulations, (3) a management program for groundwater protection and remediation, (4) a summary and identification of areas that may be contaminated with hazardous waste, (5) strategies for controlling these sources, (6) a remedial action program, and (7) decontamination and decommissioning and related remedial action requirements. Many of the above elements are covered by existing programs at the Hanford Site; thus, one of the primary purposes of this document is to provide a framework for coordination of existing groundwater protection activities. Additionally, it describes how information needs are identified and can be incorporated into existing or proposed new programs. The Groundwater Protection Management Program provides the general scope, philosophy, and strategies for groundwater protection/management at the Hanford Site. Subtier documents provide the detailed plans for implementing groundwater-related activities and programs. Related schedule and budget information are provided in the 5-year plan for environmental restoration and waste management at the Hanford Site.« less

  11. Remediation in Canadian medical residency programs: Established and emerging best practices.

    PubMed

    Shearer, Cindy; Bosma, Mark; Bergin, Fiona; Sargeant, Joan; Warren, Andrew

    2018-02-23

    Policies to guide remediation in postgraduate medical education exist in all Canadian medical schools. This study examines concordance between these policies and processes, and published "best practices" in remediation. We conducted a literature review to identify best practices in the area of remediation. We then reviewed remediation policies from all 13 English medical schools in Canada other than our own and conducted interviews with key informants from each institution. Each policy and interview transcript pair was then reviewed for evidence of pre-defined "best practices." Team members also noted additional potential policy or process enablers of successful remediation. Most policies and processes aligned with some but not all published best practices. For instance, all participating schools tailored remediation strategies to individual resident needs, and a majority encouraged faculty-student relationships during remediation. Conversely, few required the teaching of goal-setting, strategic planning, self-monitoring, and self-awareness. In addition, we identified avoidance of automatic training extension and the use of an educational review board to support the remediation process as enablers for success. Remediation policies and practices in Canada align well with published best practices in this area. Based on key informant opinions, flexibility to avoid training extension and use of an educational review board may also support optimal remediation outcomes.

  12. Tank waste remediation system privatization infrastructure program, configuration management implementation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schaus, P.S.

    This Configuration Management Implementation Plan (CMIP) was developed to assist in managing systems, structures, and components (SSCS), to facilitate the effective control and statusing of changes to SSCS, and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Privatization Infrastructure will take in implementing a configuration management program, to identify the Program`s products that need configuration management control, to determine the rigor of control, and to identify the mechanisms for that control.

  13. Remediation plans in family medicine residency

    PubMed Central

    Audétat, Marie-Claude; Voirol, Christian; Béland, Normand; Fernandez, Nicolas; Sanche, Gilbert

    2015-01-01

    Abstract Objective To assess use of the remediation instrument that has been implemented in training sites at the University of Montreal in Quebec to support faculty in diagnosing and remediating resident academic difficulties, to examine whether and how this particular remediation instrument improves the remediation process, and to determine its effects on the residents’ subsequent rotation assessments. Design A multimethods approach in which data were collected from different sources: remediation plans developed by faculty, program statistics for the corresponding academic years, and students’ academic records and rotation assessment results. Setting Family medicine residency program at the University of Montreal. Participants Family medicine residents in academic difficulty. Main outcome measures Assessment of the content, process, and quality of remediation plans, and students’ academic and rotation assessment results (successful, below expectations, or failure) both before and after the remediation period. Results The framework that was developed for assessing remediation plans was used to analyze 23 plans produced by 10 teaching sites for 21 residents. All plans documented cognitive problems and implemented numerous remediation measures. Although only 48% of the plans were of good quality, implementation of a remediation plan was positively associated with the resident’s success in rotations following the remediation period. Conclusion The use of remediation plans is well embedded in training sites at the University of Montreal. The residents’ difficulties were mainly cognitive in nature, but this generally related to deficits in clinical reasoning rather than knowledge gaps. The reflection and analysis required to produce a remediation plan helps to correct many academic difficulties and normalize the academic career of most residents in difficulty. Further effort is still needed to improve the quality of plans and to support teachers.

  14. «Cognitus & Moi»: A Computer-Based Cognitive Remediation Program for Children with Intellectual Disability

    PubMed Central

    Demily, Caroline; Rigard, Caroline; Peyroux, Elodie; Chesnoy-Servanin, Gabrielle; Morel, Aurore; Franck, Nicolas

    2016-01-01

    Attentional, visuospatial, and social cognition deficits have a negative impact on children’s adaptative and social competences and, as a result, on their ability to achieve a normal functioning and behavior. Until now and despite the frequency of those deficits, there is a lack of children’s specific cognitive remediation tools specifically dedicated to attentional and visuospatial areas. The «Cognitus & Moi» program involves a variety of exercises in a paper and/or pencil (n = 30) or a computerized format (n = 29) and a strategy coaching approach. Each module of «Cognitus & Moi» targets a single impaired cognitive area, within the limits of cognitive domains’ overlapping. The little cartoon character named Cognitus, who illustrates the program, is supposed to be very friendly and kind toward children. Cognitus will accompany them throughout the program for an effective and positive reinforcement. The main goal of «Cognitus & Moi» is to adjust to children’s difficulties in daily life. Moreover, since the cognitive remediation benefit is complex to apply in daily life, the program is based on a metacognitive strategy. After a complete neuropsychological assessment and a psychoeducational session (with the child and the parents), 16 1-h-sessions of cognitive remediation with the therapist are proposed. Each session is composed of three parts: (1) computerized tasks focusing on specific attentional or visuospatial components (20 min). The attentional module targets hearing, visual, and divided attention. A double attention task is also proposed. The visuospatial module targets eye tracking and gaze direction, spatial orientation, visuospatial memory and construction, and mental imagery; (2) pen and paper tasks focusing on the same processes (20 min) and a facial emotion recognition task; (3) a proposal of a home-based task (during 20 min). Weekly, specific attentional and visuospatial home tasks are proposed to the child and analyzed with

  15. 40 CFR 761.345 - Form of the waste to be sampled.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ....345 Section 761.345 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC... Characterization for PCB Disposal in Accordance With § 761.62, and Sampling PCB Remediation Waste Destined for Off... waste and PCB remediation waste destined for off-site disposal must be in the form of either flattened...

  16. 40 CFR 761.345 - Form of the waste to be sampled.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ....345 Section 761.345 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC... Characterization for PCB Disposal in Accordance With § 761.62, and Sampling PCB Remediation Waste Destined for Off... waste and PCB remediation waste destined for off-site disposal must be in the form of either flattened...

  17. 40 CFR 761.345 - Form of the waste to be sampled.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ....345 Section 761.345 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC... Characterization for PCB Disposal in Accordance With § 761.62, and Sampling PCB Remediation Waste Destined for Off... waste and PCB remediation waste destined for off-site disposal must be in the form of either flattened...

  18. Multidisciplinary investigation of the fate, transport, and remediation of chlorinated solvents in fractured rocks at the former Naval Air Warfare Center (NAWC): Scientific and management challenges, and strategies for a successful research program

    NASA Astrophysics Data System (ADS)

    Tiedeman, C. R.; Goode, D. J.; Shapiro, A. M.; Lacombe, P. J.; Chapelle, F. H.; Bradley, P. M.; Imbrigiotta, T. E.; Williams, J. H.; Curtis, G. P.; Hsieh, P. A.

    2008-12-01

    At the former Naval Air Warfare Center (NAWC) in West Trenton NJ, the U.S. Geological Survey, in cooperation with the U.S. Navy and under support from the Strategic Environmental Research and Development Program (SERDP), is investigating the fate, transport, and remediation of trichloroethylene (TCE) and its daughter products in dipping, fractured mudstones underlying the site. TCE concentrations in ground water are as high as ~100 mg/L. Objectives of multidisciplinary research at the NAWC include (1) understanding the physical, chemical, and microbiological processes and properties affecting the fate, transport, and removal of chlorinated solvents in fractured rocks, (2) assessing the efficiency of different remediation methods (pump and treat, natural and enhanced biodegradation), and (3) transferring the results to help remediate other contaminated fractured rock aquifers. There are numerous scientific and technical challenges to meeting these goals, including the extreme spatial variability of flow and transport properties at the NAWC and the complex distribution of contaminants, geochemical constituents, and microorganisms in fractures and the rock matrix. In addition, there are management challenges that are equally important to address in order to achieve a successful research program. These include balancing the requirements of the many parties involved at the site, including researchers, the site owner, and regulatory agencies; and ensuring that limited research funds are directed towards work that addresses the most important scientific questions as well as stakeholder concerns. Strategies for the scientific challenges at NAWC include developing a carefully planned program to characterize spatial variability in rock properties and groundwater constituents so that the data obtained are applicable to solving research questions focused on remediation. Strategies for the management challenges include fostering open lines of communication among all parties and

  19. ASSESSING THE ROLE OF NATURAL ATTENUATION FOR INORGANIC CONTAMINANT REMEDIATION IN GROUND WATER

    EPA Science Inventory

    Monitored natural attenuation (MNA) has been applied as a knowledge-based remediation technology for organic contaminants in ground water. The application of this technology is being considered for remediation of inorganic contaminants in ground water at hazardous waste sites. ...

  20. Tackling the Challenge of Deep Vadose Zone Remediation at the Hanford Site

    NASA Astrophysics Data System (ADS)

    Morse, J. G.; Wellman, D. M.; Gephart, R.

    2010-12-01

    The Central Plateau of the Hanford Site in Washington State contains some 800 waste disposal sites where 1.7 trillion liters of contaminated water was once discharged into the subsurface. Most of these sites received liquids from the chemical reprocessing of spent uranium fuel to recover plutonium. In addition, 67 single shell tanks have leaked or are suspected to have leaked 3.8 million liters of high alkali and aluminate rich cesium-contaminated liquids into the sediment. Today, this inventory of subsurface contamination contains an estimated 550,000 curies of radioactivity and 150 million kg (165,000 tons) of metals and hazardous chemicals. Radionuclides range from mobile 99Tc to more immobilized 137Cs, 241Am, uranium, and plutonium. A significant fraction of these contaminants likely remain within the deep vadose zone. Plumes of groundwater containing tritium, nitrate, 129I and other contaminants have migrated through the vadose zone and now extend outward from the Central Plateau to the Columbia River. During most of Hanford Site history, subsurface studies focused on groundwater monitoring and characterization to support waste management decisions. Deep vadose zone studies were not a priority because waste practices relied upon that zone to buffer contaminant releases into the underlying aquifer. Remediation of the deep vadose zone is now central to Hanford Site cleanup because these sediments can provide an ongoing source of contamination to the aquifer and therefore to the Columbia River. However, characterization and remediation of the deep vadose zone pose some unique challenges. These include sediment thickness; contaminant depth; coupled geohydrologic, geochemical, and microbial processes controlling contaminant spread; limited availability and effectiveness of traditional characterization tools and cleanup remedies; and predicting contaminant behavior and remediation performance over long time periods and across molecular to field scales. The U

  1. Remedial Action Assessment System (RAAS): Evaluation of selected feasibility studies of CERCLA (Comprehensive Environmental Response, Compensation, and Liability Act) hazardous waste sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Whelan, G.; Hartz, K.E.; Hilliard, N.D.

    1990-04-01

    Congress and the public have mandated much closer scrutiny of the management of chemically hazardous and radioactive mixed wastes. Legislative language, regulatory intent, and prudent technical judgment, call for using scientifically based studies to assess current conditions and to evaluate and select costeffective strategies for mitigating unacceptable situations. The NCP requires that a Remedial Investigation (RI) and a Feasibility Study (FS) be conducted at each site targeted for remedial response action. The goal of the RI is to obtain the site data needed so that the potential impacts on public health or welfare or on the environment can be evaluatedmore » and so that the remedial alternatives can be identified and selected. The goal of the FS is to identify and evaluate alternative remedial actions (including a no-action alternative) in terms of their cost, effectiveness, and engineering feasibility. The NCP also requires the analysis of impacts on public health and welfare and on the environment; this analysis is the endangerment assessment (EA). In summary, the RI, EA, and FS processes require assessment of the contamination at a site, of the potential impacts in public health or the environment from that contamination, and of alternative RAs that could address potential impacts to the environment. 35 refs., 7 figs., 1 tab.« less

  2. A Review of Remediation Programs in Pharmacy and Other Health Professions

    PubMed Central

    Fuller, Stephen H.; Hritcko, Philip M.; Matsumoto, Rae R.; Soltis, Denise A.; Taheri, Reza R.; Duncan, Wendy

    2010-01-01

    The Accreditation Council for Pharmacy Education (ACPE) Accreditation Standards and Guidelines 2007 states that colleges and schools of pharmacy must have a remediation policy. Few comparative studies on remediation have been published by colleges and schools of pharmacy, making it challenging to implement effective and validated approaches. Effective remediation policies should include early detection of problems in academic performance, strategies to help students develop better approaches for academic success, and facilitation of self-directed learning. While the cost of remediation can be significant, revenues generated either cover or exceed the cost of delivering the remediation service. Additional research on remediation in pharmacy education across the United States and abroad is needed to make sound decisions in developing effective policies. This paper provides a review of current practices and recommendations for remediation in pharmacy and health care education. PMID:20414438

  3. REMEDIATION OF CONTAMINATED SOILS BY SOLVENT FLUSHING

    EPA Science Inventory

    Solvent flushing is a potential technique for remediating a waste disposal/spill site contaminated with organic chemicals. This technique involves the injection of a solvent mixture (e.g., water plus alcohols) that enhances contaminant solubility, reduces the retardation factor, ...

  4. Tandem microwave waste remediation and decontamination system

    DOEpatents

    Wicks, George G.; Clark, David E.; Schulz, Rebecca L.

    1999-01-01

    The invention discloses a tandem microwave system consisting of a primary chamber in which microwave energy is used for the controlled combustion of materials. A second chamber is used to further treat the off-gases from the primary chamber by passage through a susceptor matrix subjected to additional microwave energy. The direct microwave radiation and elevated temperatures provide for significant reductions in the qualitative and quantitative emissions of the treated off gases. The tandem microwave system can be utilized for disinfecting wastes, sterilizing materials, and/or modifying the form of wastes to solidify organic or inorganic materials. The simple design allows on-site treatment of waste by small volume waste generators.

  5. Sandia National Laboratories California Waste Management Program Annual Report February 2008.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brynildson, Mark E.

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Waste Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This annual program report describes the activities undertaken during the past year, and activities planned in future years to implement the Waste Management (WM) Program, one of six programs that supports environmental management at SNL/CA.

  6. 77 FR 65351 - Missouri: Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-26

    ...: Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental Protection Agency (EPA... Jackson-Johnson, Environmental Protection Agency, Waste Enforcement & Materials Management Branch, 11201... its hazardous waste program under the Resource Conservation and Recovery Act (RCRA). EPA proposes to...

  7. 77 FR 69788 - Colorado: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-21

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... authorization of changes to its hazardous waste program under the Resource Conservation and Recovery Act (RCRA). The EPA proposes to grant final authorization to the hazardous waste program changes submitted by the...

  8. 77 FR 60919 - Tennessee: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-05

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental..., Division of Solid Waste Management, 5th Floor, L & C Tower, 401 Church Street, Nashville, Tennessee 37243... RCRA hazardous waste management program. We granted authorization for changes to Tennessee's program on...

  9. 40 CFR 264.555 - Disposal of CAMU-eligible wastes in permitted hazardous waste landfills.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... taking place identifies principal hazardous constitutes in such waste, in accordance with § 264.552(e)(4... following standards specified for CAMU-eligible wastes: (i) The treatment standards under § 264.552(e)(4)(iv... authorizes receipt of such waste. (e) For each remediation, CAMU-eligible waste may not be placed in an off...

  10. 40 CFR 264.555 - Disposal of CAMU-eligible wastes in permitted hazardous waste landfills.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... taking place identifies principal hazardous constitutes in such waste, in accordance with § 264.552(e)(4... following standards specified for CAMU-eligible wastes: (i) The treatment standards under § 264.552(e)(4)(iv... authorizes receipt of such waste. (e) For each remediation, CAMU-eligible waste may not be placed in an off...

  11. 40 CFR 264.555 - Disposal of CAMU-eligible wastes in permitted hazardous waste landfills.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... taking place identifies principal hazardous constitutes in such waste, in accordance with § 264.552(e)(4... following standards specified for CAMU-eligible wastes: (i) The treatment standards under § 264.552(e)(4)(iv... authorizes receipt of such waste. (e) For each remediation, CAMU-eligible waste may not be placed in an off...

  12. 40 CFR 264.555 - Disposal of CAMU-eligible wastes in permitted hazardous waste landfills.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... taking place identifies principal hazardous constitutes in such waste, in accordance with § 264.552(e)(4... following standards specified for CAMU-eligible wastes: (i) The treatment standards under § 264.552(e)(4)(iv... authorizes receipt of such waste. (e) For each remediation, CAMU-eligible waste may not be placed in an off...

  13. 10 CFR 431.386 - Remedies.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 3 2011-01-01 2011-01-01 false Remedies. 431.386 Section 431.386 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY PROGRAM FOR CERTAIN COMMERCIAL AND INDUSTRIAL EQUIPMENT Enforcement § 431.386 Remedies. If the Secretary determines that a basic model of any covered equipment does...

  14. Toxic Remediation System And Method

    DOEpatents

    Matthews, Stephen M.; Schonberg, Russell G.; Fadness, David R.

    1996-07-23

    What is disclosed is a novel toxic waste remediation system designed to provide on-site destruction of a wide variety of hazardous organic volatile hydrocarbons, including but not limited to halogenated and aromatic hydrocarbons in the vapor phase. This invention utilizes a detoxification plenum and radiation treatment which transforms hazardous organic compounds into non-hazardous substances.

  15. 7 CFR 625.16 - Violations and remedies.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 6 2011-01-01 2011-01-01 false Violations and remedies. 625.16 Section 625.16..., DEPARTMENT OF AGRICULTURE WATER RESOURCES HEALTHY FORESTS RESERVE PROGRAM § 625.16 Violations and remedies... section, NRCS reserves the right to enter upon the easement area at any time to remedy deficiencies or...

  16. 75 FR 918 - Oregon: Final Authorization of State Hazardous Waste Management Program Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-07

    ... Authorization of State Hazardous Waste Management Program Revision AGENCY: Environmental Protection Agency (EPA... hazardous waste management program under the Resource Conservation and Recovery Act, as amended (RCRA). On... has decided that the revisions to the Oregon hazardous waste management program satisfy all of the...

  17. 78 FR 5350 - Adequacy of Massachusetts Municipal Solid Waste Landfill Permit Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-25

    ...] Adequacy of Massachusetts Municipal Solid Waste Landfill Permit Program AGENCY: Environmental Protection... modification of its approved Municipal Solid Waste Landfill Program. On March 22, 2004, EPA issued final... solid waste landfills by approved states. On December 7, 2012 Massachusetts submitted an application to...

  18. Phosphate-Mediated Remediation of Metals and Radionuclides

    DOE PAGES

    Martinez, Robert J.; Beazley, Melanie J.; Sobecky, Patricia A.

    2014-01-01

    Worldwide industrialization activities create vast amounts of organic and inorganic waste streams that frequently result in significant soil and groundwater contamination. Metals and radionuclides are of particular concern due to their mobility and long-term persistence in aquatic and terrestrial environments. As the global population increases, the demand for safe, contaminant-free soil and groundwater will increase as will the need for effective and inexpensive remediation strategies. Remediation strategies that include physical and chemical methods (i.e., abiotic) or biological activities have been shown to impede the migration of radionuclide and metal contaminants within soil and groundwater. However, abiotic remediation methods are oftenmore » too costly owing to the quantities and volumes of soils and/or groundwater requiring treatment. The in situ sequestration of metals and radionuclides mediated by biological activities associated with microbial phosphorus metabolism is a promising and less costly addition to our existing remediation methods. This review highlights the current strategies for abiotic and microbial phosphate-mediated techniques for uranium and metal remediation.« less

  19. 76 FR 6564 - Florida: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-07

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... implement the RCRA hazardous waste management program. We granted authorization for changes to their program..., 06/ 62-730.185(1) F.A.C. Universal Waste Management. 29/07. State Initiated Changes to the 62-730.210...

  20. Fluidized bed steam reformed mineral waste form performance testing to support Hanford Supplemental Low Activity Waste Immobilization Technology Selection

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jantzen, C. M.; Pierce, E. M.; Bannochie, C. J.

    This report describes the benchscale testing with simulant and radioactive Hanford Tank Blends, mineral product characterization and testing, and monolith testing and characterization. These projects were funded by DOE EM-31 Technology Development & Deployment (TDD) Program Technical Task Plan WP-5.2.1-2010-001 and are entitled “Fluidized Bed Steam Reformer Low-Level Waste Form Qualification”, Inter-Entity Work Order (IEWO) M0SRV00054 with Washington River Protection Solutions (WRPS) entitled “Fluidized Bed Steam Reforming Treatability Studies Using Savannah River Site (SRS) Low Activity Waste and Hanford Low Activity Waste Tank Samples”, and IEWO M0SRV00080, “Fluidized Bed Steam Reforming Waste Form Qualification Testing Using SRS Low Activity Wastemore » and Hanford Low Activity Waste Tank Samples”. This was a multi-organizational program that included Savannah River National Laboratory (SRNL), THOR® Treatment Technologies (TTT), Pacific Northwest National Laboratory (PNNL), Oak Ridge National Laboratory (ORNL), Office of River Protection (ORP), and Washington River Protection Solutions (WRPS). The SRNL testing of the non-radioactive pilot-scale Fluidized Bed Steam Reformer (FBSR) products made by TTT, subsequent SRNL monolith formulation and testing and studies of these products, and SRNL Waste Treatment Plant Secondary Waste (WTP-SW) radioactive campaign were funded by DOE Advanced Remediation Technologies (ART) Phase 2 Project in connection with a Work-For-Others (WFO) between SRNL and TTT.« less

  1. Remediation of electronic waste polluted soil using a combination of persulfate oxidation and chemical washing.

    PubMed

    Chen, Fu; Luo, Zhanbin; Liu, Gangjun; Yang, Yongjun; Zhang, Shaoliang; Ma, Jing

    2017-12-15

    Laboratory experiments were conducted to investigate the efficiency of a simultaneous chemical extraction and oxidation for removing persistent organic pollutants (POPs) and toxic metals from an actual soil polluted by the recycling activity of electronic waste. Various chemicals, including hydroxypropyl-β-cyclodextrin (HPCD), citric acid (CA) and sodium persulfate (SP) were applied synchronously with Fe 2+ activated oxidation to enhance the co-removal of both types of pollutants. It is found that the addition of HPCD can enhance POPs removal through solubilization of POPs and iron chelation; while the CA-chelated Fe 2+ activation process is effective for extracting metals and degrading residual POPs. Under the optimized reagent conditions, 69.4% Cu, 78.1% Pb, 74.6% Ni, 97.1% polychlorinated biphenyls, 93.8% polycyclic aromatic hydrocarbons, and 96.4% polybrominated diphenylethers were removed after the sequential application of SP-HPCD-Fe 2+ and SP-CA-Fe 2+ processes with a duration of 180 and 240 min, respectively. A high dehalogenation efficiency (84.8% bromine and 86.2% chlorine) is observed, suggesting the low accumulation of halogen-containing organic intermediates. The remediated soil can satisfy the national soil quality standard of China. Collectively, co-contaminated soil can be remediated with reasonable time and capital costs through simultaneous application of persulfate oxidation and chemical extraction. Copyright © 2017 Elsevier Ltd. All rights reserved.

  2. 77 FR 65875 - Adequacy of Arizona Municipal Solid Waste Landfill Permit Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-31

    ... Municipal Solid Waste Landfill Permit Program AGENCY: Environmental Protection Agency (EPA). ACTION: Notice... modification to Arizona's municipal solid waste landfill (MSWLF) permit program to allow the State to issue... amending the municipal solid waste landfill criteria at 40 CFR 258.4 to allow for Research, Development...

  3. California state information handbook: formerly utilized sites remedial action program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of California. It contains: a description of themore » state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full text of relevant statutes and regulations.« less

  4. Oregon state information handbook formerly utilized sites remedial action program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administater, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Oregon. It contains: a description of themore » state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.« less

  5. Iowa state information handbook: formerly utilized sites remedial action program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This volume is one of a series produced under contract with the DOE, By Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Iowa. It contains: a description of themore » state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full test of relevant statutes and regulations.« less

  6. Oregon state information handbook: formerly utilized sites remedial action program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Oregon. It contains a description of themore » state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.« less

  7. Pennsylvania state information handbook: formerly utilized sites remedial action program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and State levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Pennsylvania. It contains a description of themore » state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.« less

  8. Examples from the Greenland-Project - Gentle Remediation Optiones (GROs) on Pb/zn Contaminated Sites

    NASA Astrophysics Data System (ADS)

    Friesl-Hanl, Wolfgang; Kidd, Petra; Siebielec, Grzegorz

    2017-04-01

    The GREENLAND-project brought together "best practice" examples of several field applied gentle remediation techniques (EUFP7-project "Gentle remediation of trace element-contaminated land - GREENLAND; www.greenland-project.eu) with 17 partners from 11 countries. Gentle remediation options (GRO) comprise environmentally friendly technologies that have little or no negative impact on the soil. The main technologies are • phytoextraction • in situ immobilization and • assisted phytostabilization. Mining and processing activities affecting many sites worldwide negatively. The huge amounts of moved and treated materials have led to considerable flows of wastes and emissions. Alongside the many advantages of processed ores to our society, adverse effects in nature and risks for the environment and human health are observed. Three stages of impact of Pb/Zn-ore-treatment on the environment are discussed here: (1) On sites where the ores are mined impacts are the result of crushing, grinding, concentrating activities, and where additionally parts of the installations remain after abandoning the mine, as well as by the massive amounts of remaining deposits or wastes (mine tailings). (2) On sites where smelting and processing takes place, depending on the process (Welz, Doerschel) different waste materials are deposited. The Welz process waste generally contains less Cd and Pb than the Doerschel process waste which additionally shows higher water- extractable metals. (3) On sites close to the emitting source metal contamination can be found in areas for housing, gardening, and agricultural use. Emissions consist mainly from oxides and sulfides (Zn, Cd), sulfates (Zn, Pb, and Cd), chlorides (Pb) and carbonates (Cd). All these wastes and emissions pose potential risks of dispersion of pollutants into the food chain due to erosion (wind, water), leaching and the transfer into feeding stuff and food crops. In-situ treatments have the potential for improving the situation

  9. 7 CFR 633.13 - Violations and remedies.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 6 2011-01-01 2011-01-01 false Violations and remedies. 633.13 Section 633.13..., DEPARTMENT OF AGRICULTURE LONG TERM CONTRACTING WATER BANK PROGRAM § 633.13 Violations and remedies. (a) In... addition to any and all legal and equitable remedies as may be available to the NRCS under applicable law...

  10. 7 CFR 633.13 - Violations and remedies.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Violations and remedies. 633.13 Section 633.13..., DEPARTMENT OF AGRICULTURE LONG TERM CONTRACTING WATER BANK PROGRAM § 633.13 Violations and remedies. (a) In... addition to any and all legal and equitable remedies as may be available to the NRCS under applicable law...

  11. FY 2017 Hazardous Waste Management Grant Program for Tribes

    EPA Pesticide Factsheets

    This notice announces the availability of funds and solicits proposals from federally-recognized tribes or intertribal consortia for the development and implementation of hazardous waste programs and for building capacity to address hazardous waste

  12. WIPP Remote-Handled TRU Waste Program Update

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Most, W.; Kehrman, B.

    2006-07-01

    There are two major regulatory approval milestones necessary in order to commence disposal operations for remote-handled transuranic (RH TRU) waste at the Waste Isolation Pilot Plant (WIPP)-the RH TRU hazardous waste permit modification request [1] and the radiological characterization plan [2]. One of those milestones has been achieved. The US Environmental Protection Agency (EPA) issued its final decision to approve the Department of Energy's (DOE) RH TRU radiological characterization plan along with the RH TRU Waste Characterization Program Implementation Plan [3], on March 26, 2004. The RH TRU hazardous waste permit modification request still awaits agency approval. In EPA's decisionmore » to approve the DOE's RH TRU radiological characterization plan, the EPA also set forth the process for approving site-specific RH TRU waste characterization programs. Included in the March 29, 2005, RH TRU second Notice of Deficiency [4] (NOD) on the Class 3 Permit Modification Request for RH TRU Waste, the New Mexico Environment Department (NMED) requested that the Permittees combine their responses for the RH TRU Waste NOD with the Section 311 permit modification request NOD. The Combined Response Document was submitted April 28, 2005 [5]. Another NOD [6] was issued by the NMED on September 1, 2005, to clarify the Permittees' proposal and submit these clarifications to the administrative record. Combining both the chap. 311 [7] and RH TRU waste permit modification requests allows for both the regulator and Permittees to expedite action on the modification requests. The Combined Response Document preserves human resources and costs by having only one administrative process for both modification requests. Facility readiness requirements of the RH TRU waste final permit [8] must be implemented to declare that the WIPP is ready to receive RH TRU waste for storage and disposal. To demonstrate readiness, the WIPP is preparing for an Operational Readiness Review (ORR) of the RH

  13. The Low-Level Radioactive Waste Management Office: Thirty Years of Experience in Canada - 13308

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Benitez, Liliana; Gardiner, Mark J.; Zelmer, Robert L.

    2013-07-01

    This paper reviews thirty years of progress by the Low-Level Radioactive Waste Management Office (LLRWMO) in developing and implementing low-level radioactive waste (LLRW) remediation projects and environmentally safe co-existence strategies. It reports on the present status and the future of the national historic waste program in Canada. There are over two million cubic metres of historic LLRW in Canada. Historic LLRW is broadly defined as LLRW that was managed in the past in a manner that is no longer considered acceptable and for which the original owner cannot reasonably be held accountable. In many cases, the original owner can notmore » be identified or no longer exists. The LLRWMO was established in 1982 as Canada's agent to carry out the responsibilities of the federal government for the management of historic LLRW. The LLRWMO is operated by Atomic Energy of Canada Limited (AECL) through a cost-recovery agreement with Natural Resources Canada (NRCan), the federal department that provides the funding and establishes national policy for radioactive waste management in Canada. The LLRWMO expertise includes project managers, environmental remediation specialists, radiation surveyors, communications staff and administrative support staff. The LLRWMO in providing all aspects of project oversight and implementation contracts additional resources supplementing core staff capacity as project/program demands require. (authors)« less

  14. Soil Contamination and Remediation Strategies. Current research and future challenge

    NASA Astrophysics Data System (ADS)

    Petruzzelli, G.

    2012-04-01

    Soil contamination: the heritage of industrial development Contamination is only a part of a whole set of soil degradation processes, but it is one of paramount importance since soil pollution greatly influences the quality of water, food and human health. Soil contamination has been identified as an important issue for action in the European strategy for soil protection, it has been estimated that 3.5 million of sites are potentially contaminated in Europe. Contaminated soils have been essentially discovered in industrial sites landfills and energy production plants, but accumulation of heavy metals and organic compounds can be found also in agricultural land . Remediation strategies. from incineration to bioremediation The assessment of soil contamination is followed by remedial action. The remediation of contaminated soils started using consolidates technologies (incineration inertization etc.) previously employed in waste treatment,. This has contributed to consider a contaminated soil as an hazardous waste. This rough approximation was unfortunately transferred in many legislations and on this basis soil knowledge have been used only marginally in the clean up procedures. For many years soil quality has been identified by a value of concentration of a contaminant and excavation and landfill disposal of soil has been largely used. In the last years the knowledge of remediation technology has rapidly grown, at present many treatment processes appear to be really feasible at field scale, and soil remediation is now based on risk assessment procedures. Innovative technologies, largely dependent on soil properties, such as in situ chemical oxidation, electroremediation, bioventing, soil vapor extraction etc. have been successfully applied. Hazardous organic compounds are commonly treated by biological technologies, biorememdiation and phytoremediation, being the last partially applied also for metals. Technologies selection is no longer exclusively based on

  15. Thermal and chemical remediation of mixed waste

    DOEpatents

    Nelson, P.A.; Swift, W.M.

    1994-08-09

    A process and system for treating organic waste materials without venting gaseous emissions to the atmosphere. A fluidized bed including lime particles is operated at a temperature of at least 500 C by blowing gas having 20%/70% oxygen upwardly through the bed particles at a rate sufficient to fluidize same. A toxic organic waste material is fed into the fluidized bed where the organic waste material reacts with the lime forming CaCO[sub 3]. The off gases are filtered and cooled to condense water which is separated. A portion of the calcium carbonate formed during operation of the fluidized bed is replaced with lime particles. The off gases from the fluidized bed after drying are recirculated until the toxic organic waste material in the bed is destroyed. 3 figs.

  16. Thermal and chemical remediation of mixed waste

    DOEpatents

    Nelson, Paul A.; Swift, William M.

    1994-01-01

    A process and system for treating organic waste materials without venting gaseous emissions to the atmosphere. A fluidized bed including lime particles is operated at a temperature of at least 500.degree. C. by blowing gas having 20%/70% oxygen upwardly through the bed particles at a rate sufficient to fluidize same. A toxic organic waste material is fed into the fluidized bed where the organic waste material reacts with the lime forming CaCO.sub.3. The off gases are filtered and cooled to condense water which is separated. A portion of the calcium carbonate formed during operation of the fluidized bed is replaced with lime particles. The off gases from the fluidized bed after drying are recirculated until the toxic organic waste material in the bed is destroyed.

  17. FY 2018 Hazardous Waste Management Grant Program For Tribes

    EPA Pesticide Factsheets

    This notice announces the availability of funds and solicits proposals from federally-recognized tribes or intertribal consortia for the development and implementation of hazardous waste programs and for building capacity to address hazardous waste managem

  18. EVALUATION OF GROUNDWATER EXTRACTION REMEDIES - VOLUME III

    EPA Science Inventory

    This volume is the third of a three-volume report documenting the results of an evaluation of ground-water extraction remedies at hazardous waste sites. It consists of a collection of 112 data base reports presenting general information on sites where ground-water extraction sys...

  19. The feasibility of implementing cognitive remediation for work in community based psychiatric rehabilitation programs.

    PubMed

    McGurk, Susan R; Mueser, Kim T; Watkins, Melanie A; Dalton, Carline M; Deutsch, Heather

    2017-03-01

    Adding cognitive remediation to vocational rehabilitation services improves cognitive and work functioning in people with serious mental illness, but despite interest, the uptake of cognitive programs into community services has been slow. This study evaluated the feasibility of implementing an empirically supported cognitive remediation program in routine rehabilitation services at 2 sites. The Thinking Skills for Work (TSW) program was adapted for implementation at 2 sites of a large psychiatric rehabilitation agency providing prevocational services, but not community-based vocational services, which were provided off-site. Agency staff were trained to deliver TSW to clients with work or educational goals. Cognitive assessments were conducted at baseline and posttreatment, with work and school activity tracked for 2 years. Eighty-three participants enrolled in TSW, of whom 79.5% completed at least 6 of the 24 computer cognitive exercise sessions (M = 16.7) over an average of 18 weeks. Participants improved significantly from baseline to posttreatment in verbal learning and memory, speed of processing, and overall cognitive functioning. Over the follow-up, 25.3% of participants worked and 47.0% were involved in work or school activity. Higher work rates were observed at the site where participants had easier access to vocational services. The results support the feasibility of implementing the TSW program by frontline staff in agencies providing psychiatric rehabilitation, and suggest that ease of access to vocational services may influence work outcomes. (PsycINFO Database Record (c) 2017 APA, all rights reserved).

  20. Remediation of an oily leachate pond in Estonia.

    PubMed

    Kriipsalu, Mait; Marques, Marcia; Hogland, William

    2005-12-01

    Until recent years, waste oil and oil-contaminated waters commonly ended up in landfills. At some dump sites, ponds of oily liquids and leachate were formed. To remediate such ponds, an interdisciplinary approach is now required, keeping costs at an affordable level, particularly in countries with changing economies. From 1974 to 1993, liquid oily wastes taken to the Laguja landfill, in Estonia, were disposed of in a pond with a surface area of 9800 m2. It was estimated that the pond contained 4500-6000 m3 of oily water and 3500 m3 of oil-containing bottom sediments. This study aimed at developing an environmentally sound and cost-effective method for remediation of the oily liquids, leachate and contaminated underlying sediment material, to meet the existing legal demands. It was concluded that treatment of contaminated water is well established and the procedures carried out to meet the regulatory demands achieved satisfactory results. However, regarding treatment of sediments it was concluded that legal and technological aspects, as well as monitoring procedures are not fully established and are usually underestimated. Laboratory investigations can provide valuable information in decision-making, and contribute to effective full-scale remediation planning.

  1. Industrial Program of Waste Management - Cigeo Project - 13033

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Butez, Marc; Bartagnon, Olivier; Gagner, Laurent

    2013-07-01

    The French Planning Act of 28 June 2006 prescribed that a reversible repository in a deep geological formation be chosen as the reference solution for the long-term management of high-level and intermediate-level long-lived radioactive waste. It also entrusted the responsibility of further studies and design of the repository (named Cigeo) upon the French Radioactive Waste Management Agency (Andra), in order for the review of the creation-license application to start in 2015 and, subject to its approval, the commissioning of the repository to take place in 2025. Andra is responsible for siting, designing, implementing, operating the future geological repository, including operationalmore » and long term safety and waste acceptance. Nuclear operators (Electricite de France (EDF), AREVA NC, and the French Commission in charge of Atomic Energy and Alternative Energies (CEA) are technically and financially responsible for the waste they generate, with no limit in time. They provide Andra, on one hand, with waste packages related input data, and on the other hand with their long term industrial experiences of high and intermediate-level long-lived radwaste management and nuclear operation. Andra, EDF, AREVA and CEA established a cooperation agreement for strengthening their collaborations in these fields. Within this agreement Andra and the nuclear operators have defined an industrial program for waste management. This program includes the waste inventory to be taken into account for the design of the Cigeo project and the structural hypothesis underlying its phased development. It schedules the delivery of the different categories of waste and defines associated flows. (authors)« less

  2. Formerly Used Sites Remedial Action Program (FUSRAP) W. R. Grace Building 23 Remedial Action-Challenges and Successes - 12247

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Barber, Brenda; Honerlah, Hans; O'Neill, Mike

    2012-07-01

    include: coordination with stakeholders, coordination between multiple RA contractors, addressing unique structural challenges for Building 23, nonradiological hazards associated with the RA, weather issues, and complex final status survey (FSS) coordination. The challenges during the Phase 1 RA were handled successfully. The challenges for the Phase 2 RA, which is anticipated to be complete by late-summer of 2012, have been handled successfully so far. By fall of 2012, USACE is expecting to finalize a robust RA Closure Report, including the Final Status Survey Report, which summarizes the RA activities and documents compliance with the ROD. During the ongoing RA at Building 23, there have been and still are many challenges both technically and from a project management perspective, due in part to the nature and extent of impact at the site (residual radioactivity within an active processing building), dual oversight by the property owner and USACE, and site-specific challenges associated with a complex RA and multiple contractors. Currently, USACE and its industry partner are overseeing the completion of RA field activities. RA closure documentation for the remediation of Building 23 to address residual contamination in building materials will be reviewed/approved by USACE and its industry partner upon completion of the field activities. USACE and its industry partner are working well together, through the Settlement Agreement, to conduct a cost-efficient and effective remedial action to address the legacy issues at Building 23. This cooperative effort has set a firm foundation for achieving a successful RA at the RWDA using a 'forward think' approach, and it is a case study for other sites where an industry partner is involved. The collaborative effort led to implementation of an RA which is acceptable to the site owner, the regulators, and the public, thus allowing USACE to move this project forward successfully in the FUSRAP program. (authors)« less

  3. Rules of thumb for superfund remedy selection

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-08-01

    The guidance document describes key principles and expectations, interspersed with `best practices` based on program experience, that should be consulted during the Superfund remedy selection process. These remedy selection `Rules of Thumb` are organized into three major policy areas: (1) risk assessment and risk management, (2) developing remedial alternatives, and (3) ground-water response actions. The purpose of this guide is to briefly summarize key elements of various remedy selection guidance documents and policies in one publication.

  4. Solutions Remediate Contaminated Groundwater

    NASA Technical Reports Server (NTRS)

    2010-01-01

    During the Apollo Program, NASA workers used chlorinated solvents to clean rocket engine components at launch sites. These solvents, known as dense non-aqueous phase liquids, had contaminated launch facilities to the point of near-irreparability. Dr. Jacqueline Quinn and Dr. Kathleen Brooks Loftin of Kennedy Space Center partnered with researchers from the University of Central Florida's chemistry and engineering programs to develop technology capable of remediating the area without great cost or further environmental damage. They called the new invention Emulsified Zero-Valent Iron (EZVI). The groundwater remediation compound is cleaning up polluted areas all around the world and is, to date, NASA's most licensed technology.

  5. U.S. Geological Survey toxic Waste-Groundwater Contamination Program, fiscal year 1985

    USGS Publications Warehouse

    Ragone, S.E.

    1986-01-01

    In fiscal year 1982, the U S Geological Survey began an interdisciplinary research thrust entitled Toxic Waste-Groundwater Contamination Program The objective of the thrust was to provide earth sciences information necessary to evaluate and mitigate existing groundwater contamination problems resulting from the planned or inadvertant disposal of wastes and from certain land-use practices, and to improve future waste disposal and land-use practices The program supports process-oriented and interdisciplinary field research, and regional groundwater quality studies This article provides an overview of the current (Fiscal Year 1985) activities of the Toxic Waste Program ?? 1986 Springer-Verlag New York Inc.

  6. U.S. Geological Survey toxic Waste-Groundwater Contamination Program, fiscal year 1985

    NASA Astrophysics Data System (ADS)

    Ragone, Stephen E.

    1986-09-01

    In fiscal year 1982, the U S Geological Survey began an interdisciplinary research thrust entitled Toxic Waste-Groundwater Contamination Program The objective of the thrust was to provide earth sciences information necessary to evaluate and mitigate existing groundwater contamination problems resulting from the planned or inadvertant disposal of wastes and from certain land-use practices, and to improve future waste disposal and land-use practices The program supports process-oriented and interdisciplinary field research, and regional groundwater quality studies This article provides an overview of the current (Fiscal Year 1985) activities of the Toxic Waste Program

  7. Characterization, monitoring, and sensor technology crosscutting program: Technology summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-06-01

    The purpose of the Characterization, Monitoring, and Sensor Technology Crosscutting Program (CMST-CP) is to deliver appropriate characterization, monitoring, and sensor technology (CMST) to the Office of Waste Management (EM-30), the Office of Environmental Restoration (EM-40), and the Office of Facility Transition and Management (EM-60). The technology development must also be cost effective and appropriate to EM-30/40/60 needs. Furthermore, the required technologies must be delivered and implemented when needed. Accordingly, and to ensure that available DOE and other national resources are focused an the most pressing needs, management of the technology development is concentrated on the following Focus Areas: Contaminant Plumemore » Containment and Remediation (PFA); Landfill Stabilization (LSFA); High-Level Waste Tank Remediation (TFA); Mixed Waste Characterization, Treatment, and Disposal (MWFA); and Facility Deactivation, Decommissioning, and Material Disposition (FDDMDFA). Brief descriptions of CMST-CP projects funded in FY95 are presented.« less

  8. 48 CFR 25.702-3 - Remedies.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Remedies. 25.702-3 Section 25.702-3 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Prohibited Sources 25.702-3 Remedies. Upon the determination of a false certification...

  9. 48 CFR 25.702-3 - Remedies.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Remedies. 25.702-3 Section 25.702-3 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Prohibited Sources 25.702-3 Remedies. Upon the determination of a false certification...

  10. Installation Restoration Program. Remedial Investigation Report: Minnesota Air National Guard Base Duluth International Airport, Duluth, Minnesota. Volume 6

    DTIC Science & Technology

    1990-01-01

    reporting limit. Acceptable RPD in this case is defined as duplicate values within one detection limit of each other. I I I I I I i I i 2567I88-A1...analysis shois the :aboratory to be in ccn:rol. Results for Sa:Dle No. 88092.739 are reported on a wet weight basis, since percen:age moisture was...describes the remedial actions performed on sites confirmed to contain hazardous waste contamination which endangers the human health. The actions

  11. 40 CFR 270.110 - What must I include in my application for a RAP?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM... EPA identification number of the remediation waste management site; (b) The name, address, and... States Geological Survey (USGS) or county map showing the location of the remediation waste management...

  12. 40 CFR 270.110 - What must I include in my application for a RAP?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM... EPA identification number of the remediation waste management site; (b) The name, address, and... States Geological Survey (USGS) or county map showing the location of the remediation waste management...

  13. 40 CFR 270.110 - What must I include in my application for a RAP?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM... EPA identification number of the remediation waste management site; (b) The name, address, and... States Geological Survey (USGS) or county map showing the location of the remediation waste management...

  14. 40 CFR 270.110 - What must I include in my application for a RAP?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM... EPA identification number of the remediation waste management site; (b) The name, address, and... States Geological Survey (USGS) or county map showing the location of the remediation waste management...

  15. 15 CFR 280.202 - Penalties, remedies, and sanctions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Penalties, remedies, and sanctions. 280.202 Section 280.202 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade... PROGRAMS FASTENER QUALITY Enforcement § 280.202 Penalties, remedies, and sanctions. (a) Civil remedies. The...

  16. Preparing Underprepared Students for College: Remedial Education and Early Assessment Programs

    ERIC Educational Resources Information Center

    Tierney, William G.; Garcia, Lisa D.

    2008-01-01

    Postsecondary level remediation has recently received a great deal of attention with the public questioning the efficacy of spending money on remedial classes, and scholars questioning whether such courses are effective in helping students graduate. The California State University (CSU) system has responded to the challenge of remediation by…

  17. 76 FR 6594 - Florida: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-07

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... of the changes to its hazardous waste program under the Resource Conservation and Recovery Act (RCRA... and State Programs Section, RCRA Programs and Materials Management Branch, RCRA Division, U.S...

  18. 78 FR 25678 - Georgia: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-02

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... of changes to its hazardous waste program under the Resource Conservation and Recovery Act (RCRA... Gwendolyn Gleaton, Permits and State Programs Section, RCRA Programs and Materials Management Branch, RCRA...

  19. 77 FR 60963 - Tennessee: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-05

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... of the changes to its hazardous waste program under the Resource Conservation and Recovery Act (RCRA... Johnson, Permits and State Programs Section, RCRA Programs and Materials Management Branch, RCRA Division...

  20. Overview of Green and Sustainable Remediation for Soil and Groundwater Remediation - 12545

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Simpkin, Thomas J.; Favara, Paul

    2012-07-01

    Making remediation efforts more 'sustainable' or 'green' is a topic of great interest in the remediation community. It has been spurred on by Executive Orders from the White House, as well as Department of Energy (DOE) sustainability plans. In private industry, it is motivated by corporate sustainability goals and corporate social responsibility. It has spawned new organizations, areas of discussion, tools and practices, and guidance documents around sustainable remediation or green remediation. Green remediation can be thought of as a subset of sustainable remediation and is mostly focused on reducing the environmental footprint of cleanup efforts. Sustainable remediation includes bothmore » social and economic considerations, in addition to environmental. Application of both green and sustainable remediation (GSR) may involve two primary activities. The first is to develop technologies and alternatives that are greener or more sustainable. This can also include making existing remediation approaches greener or more sustainable. The second is to include GSR criteria in the evaluation of remediation alternatives and strategies. In other words, to include these GSR criteria in the evaluation of alternatives in a feasibility study. In some cases, regulatory frameworks allow the flexibility to include GSR criteria into the evaluation process (e.g., state cleanup programs). In other cases, regulations allow less flexibility to include the evaluation of GSR criteria (e.g., Comprehensive Environmental Response Compensation, and Liability Act (CERCLA)). New regulatory guidance and tools will be required to include these criteria in typical feasibility studies. GSR provides a number of challenges for remediation professionals performing soil and groundwater remediation projects. Probably the most significant is just trying to stay on top of the ever changing landscape of products, tools, and guidance documents coming out of various groups, the US EPA, and states. However

  1. 77 FR 3224 - New Mexico: Incorporation by Reference of State Hazardous Waste Management Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-23

    ... Mexico: Incorporation by Reference of State Hazardous Waste Management Program AGENCY: Environmental... entitled ``Approved State Hazardous Waste Management Programs,'' New Mexico's authorized hazardous waste... of the State regulations that are authorized and that the EPA will enforce under the Solid Waste...

  2. Transuranic solid waste management programs. Progress report, July--December 1975

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1976-09-01

    Progress is reported for three transuranic solid waste management programs funded at the Los Alamos Scientific Laboratory (LASL) by the Energy Research and Development Administration (ERDA) Division of Fuel Cycle and Production (NFCP). Under the Transuranic Waste Research and Development Program, continued studies have shown the potential attractiveness of fiber drums as an acceptable substitute for the current mild steel storage containers. Various fire retardants have been evaluated, with one indicating significant ability to inhibit fire propagation. Continued radiolysis studies, under laboratory and field conditions, continue to reaffirm earlier LASL results indicating no significant hazard from radiolytic reactions, assuming nomore » change in current allowable loadings. Care must be exercised to differentiate between radiolytic and chemical reactions. Other efforts have identified a modification of chemical processing to reduce the amounts of plutonium requiring retrievable storage. Studies are also in progress to enhance the sensitivity of the LASL MEGAS assay system. The Transuranic-Contaminated Solid Waste Treatment Development Facility building was 72 percent complete as of December 31, 1975, which is in accord with the existing schedule. Procurement of process components is also on schedule. Certain modifications to the facility have been made, and various pre-facility experiments on waste container handling and processing have been completed. The program for the Evaluation of Transuranic-Contaminated Radioactive Waste Disposal Areas continued development of various computer modules for simulation of radionuclide transport within the biosphere. In addition, program staff contributed to an ERDA document on radioactive waste management through the preparation of a report on burial of radioactive waste at ERDA-contractor and commercial sites.« less

  3. 36 CFR 223.198 - Administrative remedies.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Administrative remedies. 223.198 Section 223.198 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE... Act of 1990 Program § 223.198 Administrative remedies. In addition to possible debarment action...

  4. 77 FR 37898 - Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-25

    ... Activities; Submission to OMB for Review and Approval; Comment Request; Hazardous Remediation Waste....regulations.gov . Title: Hazardous Remediation Waste Management Requirements (HWIR- Media) (Renewal). ICR... program), EPA regulates newly generated hazardous wastes, as well as hazardous remediation wastes (i.e...

  5. 78 FR 15299 - New York: Final Authorization of State Hazardous Waste Management Program Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-11

    ... authorization of changes to its hazardous waste program under the Solid Waste Disposal Act, as amended, commonly... Solid Waste Amendments of 1984 (HSWA). New Federal requirements and prohibitions imposed by Federal...: Final Authorization of State Hazardous Waste Management Program Revision AGENCY: Environmental...

  6. Electrokinetic remediation of contaminated soil with waste-lubricant oils and zinc.

    PubMed

    Park, Sung-Woo; Lee, Jae-Young; Yang, Jung-Seok; Kim, Kyoung-Jo; Baek, Kitae

    2009-09-30

    The feasibility of electrokinetic technology on the remediation of mixed-waste-contaminated railroad soil, contaminated by lubricant oil and zinc, was investigated. To enhance the removal efficiency, catholyte purging with 0.1M HNO(3) and a supply of non-ionic surfactant, secondary alcohol ethoxylate, was applied to the anode to remove Zn and to solubilize the lubricant oil. The catholyte purging maintained the soil pH as acidic and enhanced desorption of zinc from the soil, where the zeta potential of the acidic soil became positive. Thereafter, the direction of electro-osmotic flow was changed from the cathode to anode and the flow rate was reduced. The lesser in magnitude reverse electro-osmotic flow inhibited the migration of zinc and the lubricant oil was removed by the electro-osmotic flow. The removal of zinc and lubricant oil was enhanced with an increase in voltage gradient; however, a higher voltage gradient resulted in higher energy expenditure. After electrokinetic operation over 17 days, the removal efficiency of zinc was 22.1-24.3%, and that of lubricant oil was 45.1-55.0%. Although the removal of lubricant oil was quite high, the residual concentration did not meet Korean regulation levels.

  7. 75 FR 53220 - Adequacy of New Hampshire Municipal Solid Waste Landfill Permit Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-31

    ...] Adequacy of New Hampshire Municipal Solid Waste Landfill Permit Program AGENCY: Environmental Protection... approved municipal solid waste landfill (MSWLF) program. The approved modification allows the State to..., and demonstration (RD&D) permits to be issued to certain municipal solid waste landfills by approved...

  8. 78 FR 25579 - Georgia: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-02

    ... prohibitions imposed by Federal regulations that EPA promulgates pursuant to the Hazardous and Solid Waste...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... authorization of changes to its hazardous waste program under the Resource Conservation and Recovery Act (RCRA...

  9. OVERVIEW OF MINE WASTE TECHNOLOGY PROGRAM

    EPA Science Inventory

    The Mine Waste Technology Program (MWTP) is an interagency agreement with the DOE and has partnerships with Universities, Forest Service, BLM, Industry and states. The mission of the MWTP is to provide engineering solutions to national environmental issues resulting from the past...

  10. Soil contamination with cadmium, consequences and remediation using organic amendments.

    PubMed

    Khan, Muhammad Amjad; Khan, Sardar; Khan, Anwarzeb; Alam, Mehboob

    2017-12-01

    Cadmium (Cd) contamination of soil and food crops is a ubiquitous environmental problem that has resulted from uncontrolled industrialization, unsustainable urbanization and intensive agricultural practices. Being a toxic element, Cd poses high threats to soil quality, food safety, and human health. Land is the ultimate source of waste disposal and utilization therefore, Cd released from different sources (natural and anthropogenic), eventually reaches soil, and then subsequently bio-accumulates in food crops. The stabilization of Cd in contaminated soil using organic amendments is an environmentally friendly and cost effective technique used for remediation of moderate to high contaminated soil. Globally, substantial amounts of organic waste are generated every day that can be used as a source of nutrients, and also as conditioners to improve soil quality. This review paper focuses on the sources, generation, and use of different organic amendments to remediate Cd contaminated soil, discusses their effects on soil physical and chemical properties, Cd bioavailability, plant uptake, and human health risk. Moreover, it also provides an update of the most relevant findings about the application of organic amendments to remediate Cd contaminated soil and associated mechanisms. Finally, future research needs and directions for the remediation of Cd contaminated soil using organic amendments are discussed. Copyright © 2017 Elsevier B.V. All rights reserved.

  11. 42 CFR 51.10 - Remedial actions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Remedial actions. 51.10 Section 51.10 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS REQUIREMENTS APPLICABLE TO THE PROTECTION AND ADVOCACY FOR INDIVIDUALS WITH MENTAL ILLNESS PROGRAM Basic Requirements § 51.10 Remedial...

  12. New Mexico Math Remediation Taskforce Report

    ERIC Educational Resources Information Center

    New Mexico Higher Education Department, 2016

    2016-01-01

    The Math Remediation Task Force is comprised of faculty from two-year, four-year comprehensive, and four-year flagship higher education institutions throughout the state of New Mexico. Its members have varying levels of experience with designing/implementing multiple math remediation programs including traditional, co-requisite and acceleration…

  13. Decontamination systems information and research program. Quarterly report, April--June 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This report contains separate reports on the following subtasks: analysis of the Vortec cyclone melting system for remediation of PCB contaminated soils using CFD; drain enhanced soil flushing using prefabricated vertical drains; performance and characteristics evaluation of acrylates as grout barriers; development of standard test protocol barrier design models for desiccation barriers, and for in-situ formed barriers; in-situ bioremediation of chlorinated solvents at Portsmouth Gaseous Diffusion Plant; development of a decision support system and a prototype database for management of the EM50 technology development program; GIS-based infrastructure for site characterization and remediation; treatment of mixed wastes via fluidized bed steammore » reforming; use of centrifugal membrane technology to treat hazardous/radioactive waste; environmental pollution control devices based on novel forms of carbon; development of instrumental methods for analysis of nuclear wastes and environmental materials; production and testing of biosorbents and cleaning solutions for D and D; use of SpinTek centrifugal membrane and sorbents/cleaning solutions for D and D; West Virginia High Tech Consortium Foundation--Environmental support program; small business interaction opportunities; and approach for assessing potential voluntary environmental protection.« less

  14. 76 FR 270 - Alaska: Adequacy of Alaska Municipal Solid Waste Landfill Permit Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-04

    ...] Alaska: Adequacy of Alaska Municipal Solid Waste Landfill Permit Program AGENCY: Environmental Protection... approved Municipal Solid Waste Landfill (MSWLF) permit program. The approved modification allows the State..., EPA issued a final rule (69 FR 13242) amending the Municipal Solid Waste Landfill (MSWLF) criteria in...

  15. Building Sustainability into the Air Force Remediation Process

    DTIC Science & Technology

    2009-05-06

    Sustainability in AF Remediation: “Green” Remediation Phytoremediation , Travis AFB, CA  Sustainability metrics not new endeavor  ER programs focus on cost, risk...remediation technology examples:  Phytoremediation – 5  LNAPL recovery – 16  Passive in situ treatment Wetlands  Enh bio – 114  MNA – 105

  16. Tutoring Companies Take Over Remedial Teaching at Some Colleges.

    ERIC Educational Resources Information Center

    Gose, Ben

    1997-01-01

    Kaplan Educational Centers and Sylvan Learning Centers, private remedial instruction programs, are being used increasingly to move students through college remedial programs more quickly, either through oversight or teaching. One uses its own instructors; the other hires teachers already employed by client colleges. Some find the services…

  17. The application of zero-valent iron nanoparticles for the remediation of a uranium-contaminated waste effluent.

    PubMed

    Dickinson, Michelle; Scott, Thomas B

    2010-06-15

    Zero-valent iron nanoparticles (INP) were investigated as a remediation strategy for a uranium-contaminated waste effluent from AWE, Aldermaston. Nanoparticles were introduced to the effluent, under both oxic and anoxic conditions, and allowed to react for a 28-d period during which the liquid and nanoparticle solids were periodically sampled. Analysis of the solution indicated that under both conditions U was removed to <1.5% of its initial concentration within 1h of introduction and remained at similar concentrations until approximately 48 h. A rapid release of Fe into solution was also recorded during this initial period; attributed to the limited partial dissolution of the INP. XPS analyses of the reacted nanoparticulate solids between 1 and 48 h showed an increased Fe(III):Fe(II) ratio, consistent with the detection of iron oxidation products (akaganeite and magnetite) by XRD and FIB. XPS analysis also recorded uranium on the recovered particulates indicating the chemical reduction of U(VI) to U(IV) within 1h. Following the initial retention period U-dissolution of U was recorded from 48 h, and attributed to reoxidation. The efficient uptake and retention of U on the INP for periods up to 48 h provide proof that INP may be effectively used for the remediation of complex U-contaminated effluents. Copyright 2010 Elsevier B.V. All rights reserved.

  18. Innovative mathematical modeling in environmental remediation.

    PubMed

    Yeh, Gour-Tsyh; Gwo, Jin-Ping; Siegel, Malcolm D; Li, Ming-Hsu; Fang, Yilin; Zhang, Fan; Luo, Wensui; Yabusaki, Steve B

    2013-05-01

    There are two different ways to model reactive transport: ad hoc and innovative reaction-based approaches. The former, such as the Kd simplification of adsorption, has been widely employed by practitioners, while the latter has been mainly used in scientific communities for elucidating mechanisms of biogeochemical transport processes. It is believed that innovative mechanistic-based models could serve as protocols for environmental remediation as well. This paper reviews the development of a mechanistically coupled fluid flow, thermal transport, hydrologic transport, and reactive biogeochemical model and example-applications to environmental remediation problems. Theoretical bases are sufficiently described. Four example problems previously carried out are used to demonstrate how numerical experimentation can be used to evaluate the feasibility of different remediation approaches. The first one involved the application of a 56-species uranium tailing problem to the Melton Branch Subwatershed at Oak Ridge National Laboratory (ORNL) using the parallel version of the model. Simulations were made to demonstrate the potential mobilization of uranium and other chelating agents in the proposed waste disposal site. The second problem simulated laboratory-scale system to investigate the role of natural attenuation in potential off-site migration of uranium from uranium mill tailings after restoration. It showed inadequacy of using a single Kd even for a homogeneous medium. The third example simulated laboratory experiments involving extremely high concentrations of uranium, technetium, aluminum, nitrate, and toxic metals (e.g., Ni, Cr, Co). The fourth example modeled microbially-mediated immobilization of uranium in an unconfined aquifer using acetate amendment in a field-scale experiment. The purposes of these modeling studies were to simulate various mechanisms of mobilization and immobilization of radioactive wastes and to illustrate how to apply reactive transport

  19. Association of General Surgery Resident Remediation and Program Director Attitudes With Resident Attrition.

    PubMed

    Schwed, Alexander C; Lee, Steven L; Salcedo, Edgardo S; Reeves, Mark E; Inaba, Kenji; Sidwell, Richard A; Amersi, Farin; Are, Chandrakanth; Arnell, Tracey D; Damewood, Richard B; Dent, Daniel L; Donahue, Timothy; Gauvin, Jeffrey; Hartranft, Thomas; Jacobsen, Garth R; Jarman, Benjamin T; Melcher, Marc L; Mellinger, John D; Morris, Jon B; Nehler, Mark; Smith, Brian R; Wolfe, Mary; Kaji, Amy H; de Virgilio, Christian

    2017-12-01

    program, and 18 (21.2%) exited graduate medical education altogether. Each program had an annual attrition rate ranging from 0.73% to 6.0% (median [IQR], 2.5% [1.5%-3.4%]). Low-attrition programs were more likely than high-attrition programs to use resident remediation (21.0% vs 6.8%; P < .001). Median (IQR) Qualifying Examination pass rates (93% [90%-98%] vs 92% [86%-100%]; P = .92) and Certifying Examination pass rates (83% [68%-84%] vs 81% [71%-86%]; P = .47) were similar. Program directors at high-attrition programs were more likely than their counterparts at low-attrition programs to agree with this statement: "I feel that it is my responsibility as a program director to redirect residents who should not be surgeons." The overall 5-year attrition rate of 8.8% was significantly lower than previously reported. Program directors at low-attrition programs were more likely to use resident remediation. Variations in attrition may be explained by program director attitudes, although larger studies are needed to further define program factors affecting attrition.

  20. Improving ISTEP Scores through Remediation: An Evaluation of the Language Arts Remediation at Chauncey Rose Middle School, Vigo County School Corporation.

    ERIC Educational Resources Information Center

    Emmert, Bryan E.

    A study examined the effects of a remediation program initiated at Chauncey Rose Middle School, Terre Haute, Indiana, during the 1996-97 school year. After the ISTEP test was administered to the sixth-grade class, a pull-out program for remediation was started the following year using grant monies. Subjects were 14 sixth graders, selected because…

  1. 75 FR 53268 - Adequacy of New Hampshire Municipal Solid Waste Landfill Permit Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-31

    ...] Adequacy of New Hampshire Municipal Solid Waste Landfill Permit Program AGENCY: Environmental Protection... modification of its approved Municipal Solid Waste Landfill Program. On March 22, 2004, EPA issued final... solid waste landfills by approved states. On June 28, 2010 New Hampshire submitted an application to EPA...

  2. 76 FR 303 - Alaska: Adequacy of Alaska's Municipal Solid Waste Landfill Permit Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-04

    ...] Alaska: Adequacy of Alaska's Municipal Solid Waste Landfill Permit Program AGENCY: Environmental... modification of its approved Municipal Solid Waste Landfill (MSWLF) permit program. On March 22, 2004, EPA..., Waste, and Toxics, U.S. EPA, Region 10, 1200 Sixth Avenue, Suite 900, Mailstop: AWT-122, Seattle, WA...

  3. Postsecondary Preparation and Remediation: Examining the Effect of the Early Assessment Program at California State University

    ERIC Educational Resources Information Center

    Howell, Jessica S.; Kurlaender, Michal; Grodsky, Eric

    2010-01-01

    In this paper we investigate how participation in the Early Assessment Program, which provides California high school juniors with information about their academic readiness for college-level work at California State University campuses, affects their college-going behavior and need for remediation in college. Using administrative records from…

  4. 34 CFR 685.308 - Remedial actions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false Remedial actions. 685.308 Section 685.308 Education... Direct Loan Program Schools § 685.308 Remedial actions. (a) General. The Secretary may require the... fine or take an emergency action against a school or limit, suspend, or terminate a school's...

  5. 34 CFR 685.308 - Remedial actions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 4 2011-07-01 2011-07-01 false Remedial actions. 685.308 Section 685.308 Education... Payments for Direct Loan Program Schools § 685.308 Remedial actions. (a) General. The Secretary may require... fine or take an emergency action against a school or limit, suspend, or terminate a school's...

  6. Analysis of Optical Emission Spectroscopy from a Long Transferred Arc for Waste Remediation

    NASA Astrophysics Data System (ADS)

    Giuliani, J. L.; Rogerson, J. E.; Clark, R. W.; Kepple, P.; Shamamian, V.; Sartwell, B.; Counts, D.

    1997-10-01

    The Naval Research Laboratory is investigating the application of plasma arc technology for the on-board remediation of waste material generated by sea faring ships. Part of the research component is to determine the plasma characteristics and radiation production in and near the arc under various operating conditions. In this work we present an analysis of the temperature profile in a 100 kW, 20cm long DC transferred arc for currents between 300 and 360Amps and air flow rates from 60 to 90slpm at atmospheric pressure. The working gas was seeded with hydrogen as a diagnostic. Assuming the temperature peaks at the center of the arc and LTE, the emission ratio H_α/H_β should increase radially outward, contrary to the observations. A collisional radiative equilibrium model for H and N was was developed to calculate synthetic spectra. Comparison with the data using various temperature profiles indicates that photo-pumping from the hot core leads to non-LTE populations and an inversion in the emission ratio, similar to the observed data.

  7. 40 CFR 258.57 - Selection of remedy.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...-water quantity and quality; (iv) The potential damage to wildlife, crops, vegetation, and physical... MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective Action § 258.57 Selection of remedy... environment; (2) Attain the ground-water protection standard as specified pursuant to §§ 258.55 (h) or (i); (3...

  8. 40 CFR 258.57 - Selection of remedy.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-water quantity and quality; (iv) The potential damage to wildlife, crops, vegetation, and physical... MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective Action § 258.57 Selection of remedy... environment; (2) Attain the ground-water protection standard as specified pursuant to §§ 258.55 (h) or (i); (3...

  9. 40 CFR 258.57 - Selection of remedy.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-water quantity and quality; (iv) The potential damage to wildlife, crops, vegetation, and physical... MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective Action § 258.57 Selection of remedy... environment; (2) Attain the ground-water protection standard as specified pursuant to §§ 258.55 (h) or (i); (3...

  10. Waste management/waste certification plan for the Oak Ridge National Laboratory Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clark, C. Jr.; Hunt-Davenport, L.D.; Cofer, G.H.

    1995-03-01

    This Waste Management/Waste Certification (C) Plan, written for the Environmental Restoration (ER) Program at Oak Ridge National Laboratory (ORNL), outlines the criteria and methodologies to be used in the management of waste generated during ORNL ER field activities. Other agreed upon methods may be used in the management of waste with consultation with ER and Waste Management Organization. The intent of this plan is to provide information for the minimization, handling, and disposal of waste generated by ER activities. This plan contains provisions for the safe and effective management of waste consistent with the U.S. Environmental Protection Agency`s (EPA`s) guidance.more » Components of this plan have been designed to protect the environment and the health and safety of workers and the public. It, therefore, stresses that investigation derived waste (IDW) and other waste be managed to ensure that (1) all efforts be made to minimize the amount of waste generated; (2) costs associated with sampling storage, analysis, transportation, and disposal are minimized; (3) the potential for public and worker exposure is not increased; and (4) additional contaminated areas are not created.« less

  11. EXPERIENCE IN INCINERATION APPLICABLE TO SUPERFUND SITE REMEDIATION

    EPA Science Inventory

    This document can be used as a reference tool for hazardous waste site remediation where incineration is used as a treatment alternative. It provides the user with information garnered from the experiences of others who use incineration. The document presents useful lessons in ev...

  12. APPROACHES FOR REMEDIATION OF UNCONTROLLED WOOD PRESERVING SITES

    EPA Science Inventory

    This document provides an overview of remediation of uncontrolled wood preserving sites. It is, in part, a distillation of discussions that took place at a Forum on Wood Preserving Waste that was held in San Francisco, California, in October 1988. Information from this workshop h...

  13. Using Fish Tissue Data to Monitor Remedy Effectiveness

    EPA Science Inventory

    Chapter 8 of the Contaminated Sediment Remediation Guidance for Hazardous Waste Sites (OSWER Directive 9355.0-85, December 2005), presents an approach for developing an effective monitoring plan. As stated in the Guidance, one of the goals of monitoring is to “evaluate long-term ...

  14. Synchrotron-based X-Ray Spectroscopy Studies for Redox-based Remediation of Lead, Zinc, and Cadmium in Mine Waste Materials.

    PubMed

    Karna, Ranju R; Hettiarachchi, Ganga M; Newville, Matthew; Sun, ChengJun; Ma, Qing

    2016-11-01

    Several studies have examined the effect of submergence on the mobility of metals present in mine waste materials. This study examines the effect of organic carbon (OC) and sulfur (S) additions and submergence time on redox-induced biogeochemical transformations of lead (Pb), zinc (Zn), and cadmium (Cd) present in mine waste materials collected from the Tri-State mining district located in southeastern Kansas, southwestern Missouri, and northeastern Oklahoma. A completely randomized design, with a two-way treatment structure, was used for conducting a series of column experiments. Two replicates were used for each treatment combination. Effluent samples were collected at several time points, and soil samples were collected at the end of each column experiment. Because these samples are highly heterogeneous, we used a variety of synchrotron-based techniques to identify Pb, Zn, and Cd speciation at both micro- and bulk-scale. Spectroscopic analysis results from the study revealed that the addition of OC, with and without S, promoted metal-sulfide formation, whereas metal carbonates dominated in the nonamended flooded materials and in mine waste materials only amended with S. Therefore, the synergistic effect of OC and S may be more promising for managing mine waste materials disposed of in flooded subsidence mine pits instead of individual S or OC treatments. The mechanistic understanding gained in this study is also relevant for remediation of waste materials using natural or constructed wetland systems. Copyright © by the American Society of Agronomy, Crop Science Society of America, and Soil Science Society of America, Inc.

  15. 29 CFR 35.15 - Remedial action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Remedial action. 35.15 Section 35.15 Labor Office of the Secretary of Labor NONDISCRIMINATION ON THE BASIS OF AGE IN PROGRAMS OR ACTIVITIES RECEIVING FEDERAL... Remedial action. Even in the absence of a finding of discrimination, a recipient, in administering a...

  16. DEMONSTRATION AND EVALUATION OF INNOVATIVE REMEDIATION TECHNOLOGIES THROUGH THE EPA SITE PROGRAM

    EPA Science Inventory

    The Superfund Innovative Technology Evaluation (SITE) Program has successfuly promoted the development, commercialization and implementation of innovative hazardous waste treatment technologies for 18 years. SITE offers a mechanism for conducting joint technology demonstration an...

  17. Remedial investigation work plan for Bear Creek Valley Operable Unit 2 (Rust Spoil Area, SY-200 Yard, Spoil Area 1) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-05-01

    The enactment of the Resource Conservation and Recovery Act (RCRA) in 1976 and the Hazardous and Solid Waste Amendments (HSWA) to RCRA in 1984 created management requirements for hazardous waste facilities. The facilities within the Oak Ridge Reservation (ORR) were in the process of meeting the RCRA requirements when ORR was placed on the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) National Priorities List (NPL) on November 21, 1989. Under RCRA, the actions typically follow the RCRA Facility Assessment (RFA)/RCRA Facility Investigation (RFI)/Corrective Measures Study (CMS)/Corrective Measures implementation process. Under CERCLA the actions follow the PA/SI/Remedial Investigation (RI)/Feasibility Studymore » (FS)/Remedial Design/Remedial Action process. The development of this document will incorporate requirements under both RCRA and CERCLA into an RI work plan for the characterization of Bear Creek Valley (BCV) Operable Unit (OU) 2.« less

  18. New Mexico state information handbook: formerly utilized sites remedial action program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of New Mexico. It contains a description ofmore » the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.« less

  19. 75 FR 76691 - Oregon; Correction of Federal Authorization of the State's Hazardous Waste Management Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-09

    ...; Correction of Federal Authorization of the State's Hazardous Waste Management Program AGENCY: Environmental... to the State of Oregon's federally authorized RCRA hazardous waste management program. On January 7... changes the State of Oregon made to its federally authorized RCRA Hazardous Waste Management Program...

  20. Technical area status report for waste destruction and stabilization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dalton, J.D.; Harris, T.L.; DeWitt, L.M.

    1993-08-01

    The Office of Environmental Restoration and Waste Management (EM) was established by the Department of Energy (DOE) to direct and coordinate waste management and site remediation programs/activities throughout the DOE complex. In order to successfully achieve the goal of properly managing waste and the cleanup of the DOE sites, the EM was divided into five organizations: the Office of Planning and Resource Management (EM-10); the Office of Environmental Quality Assurance and Resource Management (EM-20); the Office of Waste Operations (EM-30); the Office of Environmental Restoration (EM-40); and the Office of Technology and Development (EM-50). The mission of the Office ofmore » Technology Development (OTD) is to develop treatment technologies for DOE`s operational and environmental restoration wastes where current treatment technologies are inadequate or not available. The Mixed Waste Integrated Program (MWIP) was created by OTD to assist in the development of treatment technologies for the DOE mixed low-level wastes (MLLW). The MWIP has established five Technical Support Groups (TSGs) whose purpose is to identify, evaluate, and develop treatment technologies within five general technical areas representing waste treatment functions from initial waste handling through generation of final waste forms. These TSGs are: (1) Front-End Waste Handling, (2) Physical/Chemical Treatment, (3) Waste Destruction and Stabilization, (4) Second-Stage Destruction and Offgas Treatment, and (5) Final Waste Forms. This report describes the functions of the Waste Destruction and Stabilization (WDS) group. Specifically, the following items are discussed: DOE waste stream identification; summary of previous efforts; summary of WDS treatment technologies; currently funded WDS activities; and recommendations for future activities.« less

  1. 7 CFR 623.17 - Violations and remedies.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Violations and remedies. 623.17 Section 623.17 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE WATER RESOURCES EMERGENCY WETLANDS RESERVE PROGRAM § 623.17 Violations and remedies...

  2. 7 CFR 623.17 - Violations and remedies.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 6 2011-01-01 2011-01-01 false Violations and remedies. 623.17 Section 623.17 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE WATER RESOURCES EMERGENCY WETLANDS RESERVE PROGRAM § 623.17 Violations and remedies...

  3. Thermal and chemical remediation of mixed wastes

    DOEpatents

    Nelson, Paul A.; Swift, William M.

    1997-01-01

    A process for treating organic waste materials without venting gaseous emissions to the atmosphere which includes oxidizing the organic waste materials at an elevated temperature not less than about 500.degree. C. with a gas having an oxygen content in the range of from about 20% to about 70% to produce an oxidation product containing CO.sub.2 gas. The gas is then filtered to remove particulates, and then contacted with an aqueous absorbent solution of alkali metal carbonates or alkanolamines to absorb a portion of the CO.sub.2 gas from the particulate-free oxidation product. The CO.sub.2 absorbent is thereafter separated for further processing. A process and system are also disclosed in which the waste materials are contacted with a reactive medium such as lime and product treatment as described.

  4. TRU Waste Management Program. Cost/schedule optimization analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, taskmore » guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less

  5. Nutritional, Economic, and Environmental Costs of Milk Waste in a Classroom School Breakfast Program.

    PubMed

    Blondin, Stacy A; Cash, Sean B; Goldberg, Jeanne P; Griffin, Timothy S; Economos, Christina D

    2017-04-01

    To measure fluid milk waste in a US School Breakfast in the Classroom Program and estimate its nutritional, economic, and environmental effects. Fluid milk waste was directly measured on 60 elementary school classroom days in a medium-sized, urban district. The US Department of Agriculture nutrition database, district cost data, and carbon dioxide equivalent (CO 2 e) emissions and water footprint estimates for fluid milk were used to calculate the associated nutritional, economic, and environmental costs. Of the total milk offered to School Breakfast Program participants, 45% was wasted. A considerably smaller portion of served milk was wasted (26%). The amount of milk wasted translated into 27% of vitamin D and 41% of calcium required of School Breakfast Program meals. The economic and environmental costs amounted to an estimated $274 782 (16% of the district's total annual School Breakfast Program food expenditures), 644 893 kilograms of CO 2 e, and 192 260 155 liters of water over the school year in the district. These substantial effects of milk waste undermine the School Breakfast Program's capacity to ensure short- and long-term food security and federal food waste reduction targets. Interventions that reduce waste are urgently needed.

  6. EPA WASTE MINIMIZATION RESEARCH PROGRAM: AN OVERVIEW

    EPA Science Inventory

    The US Environmental Protection Agency (EPA) has established a waste minimization research program within the Office of Research and Development's Risk Reduction Engineering Laboratory which is the primary contact for pollution prevention research efforts concentrating on source ...

  7. Remedial Action Assessment System (RAAS): A computer-based methodology for conducting feasibility studies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Buelt, J.L.; Stottlemyre, J.A.; White, M.K.

    1991-09-01

    Because of the great complexity and number of potential waste sites facing the US Department of Energy (DOE) for potential cleanup, the DOE is supporting the development of a computer-based methodology to streamline the remedial investigations/feasibility study process required for DOE operable units. DOE operable units are generally more complex in nature because of the existence of multiple waste sites within many of the operable units and the presence of mixed radioactive and hazardous chemical wastes. Consequently, Pacific Northwest Laboratory (PNL) is developing the Remedial Action Assessment System (RAAS), which is aimed at screening, linking, and evaluating establishment technology processmore » options in support of conducting feasibility studies under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). It is also intended to do the same in support of corrective measures studies requires by the Resource Conservation and Recovery Act (RCRA). This paper presents the characteristics of two RAAS prototypes currently being developed. These include the RAAS Technology Information System, which accesses information on technologies in a graphical and tabular manner, and the main RAAS methodology, which screens, links, and evaluates remedial technologies. 4 refs., 3 figs., 1 tab.« less

  8. Remedial Action Assessment System (RAAS): A computer-based methodology for conducting feasibility studies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Buelt, J.L.; Stottlemyre, J.A.; White, M.K.

    1991-02-01

    Because of the great complexity and number of potential waste sites facing the US Department of Energy (DOE) for potential cleanup, the DOE is supporting the development of a computer-based methodology to streamline the remedial investigation/feasibility study process required for DOE operable units. DOE operable units are generally more complex in nature because of the existence of multiple waste sites within many of the operable units and the presence of mixed radioactive and hazardous chemical wastes. Consequently, Pacific Northwest Laboratory (PNL) is developing the Remedial Action Assessment System (RAAS), which is aimed at screening, linking, and evaluating established technology processmore » options in support of conducting feasibility studies under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). It is also intended to do the same in support of corrective measures studies required by the Resource Conservation and Recovery Act (RCRA). This paper presents the characteristics of two RAAS prototypes currently being developed. These include the RAAS Technology Information System, which accesses information on technologies in a graphical and tabular manner, and the main RAAS methodology, which screens, links, and evaluates remedial technologies. 4 refs., 3 figs., 1 tab.« less

  9. Observational Approach to Chromium Site Remediation - 13266

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Scott Myers, R.

    2013-07-01

    Production reactors at the U.S. Department of Energy's (DOE) Hanford Site in Richland, Washington, required massive quantities of water for reactor cooling and material processing. To reduce corrosion and the build-up of scale in pipelines and cooling systems, sodium dichromate was added to the water feedstock. Spills and other releases at the makeup facilities, as well as leaks from miles of pipelines, have led to numerous areas with chromium-contaminated soil and groundwater, threatening fish populations in the nearby Columbia River. Pump-and-treat systems have been installed to remove chromium from the groundwater, but significant contamination remain in the soil column andmore » poses a continuing threat to groundwater and the Columbia River. Washington Closure Hanford, DOE, and regulators are working on a team approach that implements the observational approach, a strategy for effectively dealing with the uncertainties inherent in subsurface conditions. Remediation of large, complex waste sites at a federal facility is a daunting effort. It is particularly difficult to perform the work in an environment of rapid response to changing field and contamination conditions. The observational approach, developed by geotechnical engineers to accommodate the inherent uncertainties in subsurface conditions, is a powerful and appropriate method for site remediation. It offers a structured means of quickly moving into full remediation and responding to the variations and changing conditions inherent in waste site cleanups. A number of significant factors, however, complicate the application of the observational approach for chromium site remediation. Conceptual models of contamination and site conditions are difficult to establish and get consensus on. Mid-stream revisions to the design of large excavations are time-consuming and costly. And regulatory constraints and contract performance incentives can be impediments to the flexible responses required under the

  10. 7 CFR 4288.136 - Remedies.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 15 2012-01-01 2012-01-01 false Remedies. 4288.136 Section 4288.136 Agriculture Regulations of the Department of Agriculture (Continued) RURAL BUSINESS-COOPERATIVE SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE PAYMENT PROGRAMS Advanced Biofuel Payment Program General...

  11. 7 CFR 4288.136 - Remedies.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 15 2013-01-01 2013-01-01 false Remedies. 4288.136 Section 4288.136 Agriculture Regulations of the Department of Agriculture (Continued) RURAL BUSINESS-COOPERATIVE SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE PAYMENT PROGRAMS Advanced Biofuel Payment Program General...

  12. 7 CFR 4288.136 - Remedies.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 15 2014-01-01 2014-01-01 false Remedies. 4288.136 Section 4288.136 Agriculture Regulations of the Department of Agriculture (Continued) RURAL BUSINESS-COOPERATIVE SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE PAYMENT PROGRAMS Advanced Biofuel Payment Program General...

  13. 78 FR 70225 - West Virginia: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-25

    ... Department of Environmental Protection, (WVDEP), Division of Water and Waste Management, 601 57th Street SE...] West Virginia: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY... for final authorization of revisions to its hazardous waste program under the Resource Conservation...

  14. 75 FR 81187 - South Dakota: Final Authorization of State Hazardous Waste Management Program Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-27

    ...: Final Authorization of State Hazardous Waste Management Program Revision AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed Rule. SUMMARY: The Solid Waste Disposal Act, as amended, commonly... Agency (EPA) to authorize states to operate their hazardous waste management programs in lieu of the...

  15. Building Staff Competencies and Selecting Communications Methods for Waste Management Programs.

    ERIC Educational Resources Information Center

    Richardson, John G.

    The Waste Management Institute provided in-service training to interested County Extension agents in North Carolina to enable them to provide leadership in developing and delivering a comprehensive county-level waste management program. Training included technical, economic, environmental, social, and legal aspects of waste management presented in…

  16. Thermal and chemical remediation of mixed wastes

    DOEpatents

    Nelson, P.A.; Swift, W.M.

    1997-12-16

    A process is described for treating organic waste materials without venting gaseous emissions to the atmosphere which includes oxidizing the organic waste materials at an elevated temperature not less than about 500 C with a gas having an oxygen content in the range of from about 20% to about 70% to produce an oxidation product containing CO{sub 2} gas. The gas is then filtered to remove particulates, and then contacted with an aqueous absorbent solution of alkali metal carbonates or alkanolamines to absorb a portion of the CO{sub 2} gas from the particulate-free oxidation product. The CO{sub 2} absorbent is thereafter separated for further processing. A process and system are also disclosed in which the waste materials are contacted with a reactive medium such as lime and product treatment as described. 8 figs.

  17. Formerly Utilized Sites Remedial Action Program (FUSRAP) Hazelwood Interim Storage Site annual site environmental report. Calendar year 1985. [FUSRAP

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1986-04-01

    The Hazelwood Interim Storage Site (HISS) is presently used for the storage of low-level radioactively contaminated soils. Monitoring results show that the HISS is in compliance with DOE concentration guides and radiation protection standards. Derived Concentration Guides (DCGs) represent the concentrations of radionuclides in air or water that would limit the radiation dose to 100 mrem/y. The applicable limits have been revised since the 1984 environmental monitoring report was published. The limits applied in 1984 were based on a radiation protection standard of 500 mrem/y; the limits applied for 1985 are based on a standard of 100 mrem/y. The HISSmore » is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where low-level radioactive contamination remains from the early years of the nation's atomic energy program. To determine whether the site is in compliance with DOE standards, environmental measurements are expressed as percentages of the applicable DCG, while the calculated doses to the public are expressed as percentages of the applicable radiation protection standard. The monitoring program at the HISS measures uranium, radium, and thorium concentrations in surface water, groundwater, and sediment; radon gas concentrations in air; and external gamma radiation exposure rates. Potential radiation doses to the public are also calculated. The HISS was designated for remedial action under FUSRAP because radioactivity above applicable limits was found to exist at the site and its vicinity. Elevated levels of radiation still exist in areas where remedial action has not yet been completed.« less

  18. Transport and fate of organic wastes in groundwater at the Stringfellow hazardous waste disposal site, southern California

    USGS Publications Warehouse

    Leenheer, J.A.; Hsu, J.; Barber, L.B.

    2001-01-01

    In January 1999, wastewater influent and effluent from the pretreatment plant at the Stringfellow hazardous waste disposal site were sampled along with groundwater at six locations along the groundwater contaminant plume. The objectives of this sampling and study were to identify at the compound class level the unidentified 40-60% of wastewater organic contaminants, and to determine what organic compound classes were being removed by the wastewater pretreatment plant, and what organic compound classes persisted during subsurface waste migration. The unidentified organic wastes are primarily chlorinated aromatic sulfonic acids derived from wastes from DDT manufacture. Trace amounts of EDTA and NTA organic complexing agents were discovered along with carboxylate metabolites of the common alkylphenolpolyethoxylate plasticizers and nonionic surfactants. The wastewater pretreatment plant removed most of the aromatic chlorinated sulfonic acids that have hydrophobic neutral properties, but the p-chlorobenzenesulfonic acid which is the primary waste constituent passed through the pretreatment plant and was discharged in the treated wastewaters transported to an industrial sewer. During migration in groundwater, p-chlorobenzenesulfonic acid is removed by natural remediation processes. Wastewater organic contaminants have decreased 3- to 45-fold in the groundwater from 1985 to 1999 as a result of site remediation and natural remediation processes. The chlorinated aromatic sulfonic acids with hydrophobic neutral properties persist and have migrated into groundwater that underlies the adjacent residential community. Copyright ?? 2001 .

  19. Survival of prokaryotes in a polluted waste dump during remediation by alkaline hydrolysis.

    PubMed

    Nielsen, Marie Bank; Kjeldsen, Kasper Urup; Lever, Mark Alexander; Ingvorsen, Kjeld

    2014-04-01

    A combination of culture-dependent and culture-independent techniques was used to characterize bacterial and archaeal communities in a highly polluted waste dump and to assess the effect of remediation by alkaline hydrolysis on these communities. This waste dump (Breakwater 42), located in Denmark, contains approximately 100 different toxic compounds including large amounts of organophosphorous pesticides such as parathions. The alkaline hydrolysis (12 months at pH >12) decimated bacterial and archaeal abundances, as estimated by 16S rRNA gene-based qPCR, from 2.1 × 10(4) and 2.9 × 10(3) gene copies per gram wet soil respectively to below the detection limit of the qPCR assay. Clone libraries constructed from PCR-amplified 16S rRNA gene fragments showed a significant reduction in bacterial diversity as a result of the alkaline hydrolysis, with preferential survival of Betaproteobacteria, which increased in relative abundance from 0 to 48 %. Many of the bacterial clone sequences and the 27 isolates were related to known xenobiotic degraders. An archaeal clone library from a non-hydrolyzed sample showed the presence of three main clusters, two representing methanogens and one representing marine aerobic ammonia oxidizers. Isolation of alkalitolerant bacterial pure cultures from the hydrolyzed soil confirmed that although alkaline hydrolysis severely reduces microbial community diversity and size certain bacteria survive a prolonged alkaline hydrolysis process. Some of the isolates from the hydrolyzed soil were capable of growing at high pH (pH 10.0) in synthetic media indicating that they could become active in in situ biodegradation upon hydrolysis.

  20. 78 FR 15338 - New York: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-11

    ... authorization of changes to its hazardous waste program under the Solid Waste Disposal Act, as amended, commonly... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 271 [EPA-R02-RCRA-2013-0144; FRL-9693-3] New York: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental...

  1. 75 FR 45583 - New York: Incorporation by Reference of State Hazardous Waste Management Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-03

    ... authorized and that EPA will enforce under the Solid Waste Disposal Act, as amended and commonly referred to...: Incorporation by Reference of State Hazardous Waste Management Program AGENCY: Environmental Protection Agency... authorized hazardous waste program which is set forth in the regulations entitled ``Approved State Hazardous...

  2. 34 CFR 668.20 - Limitations on remedial coursework that is eligible for Title IV, HEA program assistance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... course in English as a second language, the educational level of instruction provided in that course is... complete a degree or certificate program; (2) The educational level of instruction provided in the noncredit or reduced credit remedial course is below the level needed to pursue successfully the degree or...

  3. Adequacy of a Small Quantity Site RH-TRU Waste Program in Meeting Proposed WIPP Characterization Objectives

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Biedscheid, J.; Stahl, S.; Devarakonda, M.

    2002-02-26

    The first remote-handled transuranic (RH-TRU) waste is expected to be permanently disposed of at the Waste Isolation Pilot Plant (WIPP) during Fiscal Year (FY) 2003. The first RH-TRU waste shipments are scheduled from the Battelle Columbus Laboratories (BCL) to WIPP in order to facilitate compliance with BCL Decommissioning Project (BCLDP) milestones. Milestones requiring RH-TRU waste containerization and removal from the site by 2004 in order to meet a 2006 site closure goal, established by Congress in the Defense Facilities Closure Projects account, necessitated the establishment and implementation of a site-specific program to direct the packaging of BCLDP RH-TRU waste priormore » to the finalization of WIPP RH-TRU waste characterization requirements. The program was designed to collect waste data, including audio and videotape records of waste packaging, such that upon completion of waste packaging, comprehensive data records exist from which compliance with final WIPP RH-TRU waste characterization requirements can be demonstrated. With the BCLDP data records generated to date and the development by the U.S. Department of Energy (DOE)-Carlsbad Field Office (CBFO) of preliminary documents proposing the WIPP RH-TRU waste characterization program, it is possible to evaluate the adequacy of the BCLDP program with respect to meeting proposed characterization objectives. The BCLDP characterization program uses primarily acceptable knowledge (AK) and visual examination (VE) during waste packaging to characterize RH-TRU waste. These methods are used to estimate physical waste parameters, including weight percentages of metals, cellulosics, plastics, and rubber in the waste, and to determine the absence of prohibited items, including free liquids. AK combined with computer modeling is used to estimate radiological waste parameters, including total activity on a waste container basis, for the majority of BCLDP RH-TRU waste. AK combined with direct analysis is used to

  4. Cognitive Profiles and Early Reading Remediation of At-Risk Elementary School Students.

    ERIC Educational Resources Information Center

    Parrila, R. K.; Das, J. P.

    Sixty-one grade 1 students experiencing early reading difficulties received either a cognitive remediation program (PREP; PASS Remediation Program) designed to facilitate successive and simultaneous processing skills, or a meaning-based language enrichment program designed to provide children with meaningful experiences in reading. Repeated…

  5. Cylindrical Electrolyser Enhanced Electrokinetic Remediation of Municipal Solid Waste Incineration Fly Ashes

    NASA Astrophysics Data System (ADS)

    Huang, Tao; Zhou, Lulu; Tao, Junjun; Liu, Longfei

    2018-01-01

    The paper discusses enhancement and efficiency of removing spiked heavy metal (HM) contaminants from the municipal solid waste incineration (MSWI) fly ashes in the cylindrical electrolyser device. The characterization parameters of the electrolyte solution pH, electric current, electrical conductivity, voltage gradient were discussed after the experiment. The chemical speciation of HMs was analysed between the original samples and remediated ones by BCR sequential extraction. The detoxification efficiencies of Zn, Pb, Cu and Cd in the column-uniform device were compared with that in the traditional rectangular apparatus. The pH value changed smoothly with small amplitude of oscillation in general in cathode and anode compartments except the initial break. The electrical current rapidly increased on the first day of the experiment and steadily declined after that and the electrical conductivity presented a clear rising trend. The residual partition of detoxified samples were obviously lifted which was much higher than the analysis data of the raw materials. The pH and the electrical conductivity in sample region were distributed more uniformly and the blind area was effectively eliminated in the electrolytic cells which was indirectly validated by the contrastive detoxification result of the spiked HMs between the rectangular and cylindrical devices.

  6. Safety and Waste Management for SAM Pathogen Methods

    EPA Pesticide Factsheets

    The General Safety and Waste Management page offers section-specific safety and waste management details for the pathogens included in EPA's Selected Analytical Methods for Environmental Remediation and Recovery (SAM).

  7. Safety and Waste Management for SAM Biotoxin Methods

    EPA Pesticide Factsheets

    The General Safety and Waste Management page offers section-specific safety and waste management details for the biotoxins included in EPA's Selected Analytical Methods for Environmental Remediation and Recovery (SAM).

  8. Bioremediation: a genuine technology to remediate radionuclides from the environment

    PubMed Central

    Prakash, Dhan; Gabani, Prashant; Chandel, Anuj K; Ronen, Zeev; Singh, Om V

    2013-01-01

    Summary Radionuclides in the environment are a major human and environmental health concern. Like the Chernobyl disaster of 1986, the Fukushima Daiichi nuclear disaster in 2011 is once again causing damage to the environment: a large quantity of radioactive waste is being generated and dumped into the environment, and if the general population is exposed to it, may cause serious life-threatening disorders. Bioremediation has been viewed as the ecologically responsible alternative to environmentally destructive physical remediation. Microorganisms carry endogenous genetic, biochemical and physiological properties that make them ideal agents for pollutant remediation in soil and groundwater. Attempts have been made to develop native or genetically engineered (GE) microbes for the remediation of environmental contaminants including radionuclides. Microorganism-mediated bioremediation can affect the solubility, bioavailability and mobility of radionuclides. Therefore, we aim to unveil the microbial-mediated mechanisms for biotransformation of radionuclides under various environmental conditions as developing strategies for waste management of radionuclides. A discussion follows of ‘-omics’-integrated genomics and proteomics technologies, which can be used to trace the genes and proteins of interest in a given microorganism towards a cell-free bioremediation strategy. PMID:23617701

  9. Format and style for environmental documents prepared as part of the Uranium Mill Tailings Remedial Action Program. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1980-06-01

    The Uranium Mill Tailings Remedial Action Program will require the preparation of several environmental impact statements and several environmental assessments. This guide begins with a section describing in general terms the efforts required to make these documents readable. The sections describe the formats to be used for the pages, headings, front matter, footnotes, lists, figures, tables, references, glossaries, indexes, and appendixes in these documents. A final section presents some rules of style to be followed in writing the texts.

  10. 76 FR 6594 - North Carolina: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-07

    ... Carolina: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... authorization of the changes to its hazardous waste program under the Resource Conservation and Recovery Act... Section, RCRA Programs and Materials Management Branch, RCRA Division, U.S. Environmental Protection...

  11. Proceedings: Conference on Compensatory/Remedial Education.

    ERIC Educational Resources Information Center

    Fea, Henry R., Ed.; And Others

    This document presents the papers and discussions from the Conference on Compensatory/Remedial Education. The contents include: "Institutional Programs for the Low Achievers" by Joan G. Roloff; "Communication in Compensatory Education" by Henry R. Fea; "Seminar: Special Programs for Minorities" by Constance Acholonu; "Seminar: Special Programs for…

  12. MINE WASTE TECHNOLOGY PROGRAM:HISTORICAL PERSPECTIVES. CURRENT HIGHLIGHTS, FUTURE OPPORTUNITIES

    EPA Science Inventory

    For the past 13 years, the Mine Waste Technology Program has been technically driven by the National Risk Management Research Lab. A portion of the MWTP funding has been used to perform field demonstrations of innovative technologies with the potential to address mine waste issue...

  13. A Multicenter, Randomized Clinical Trial of a Cognitive Remediation Program for Childhood Survivors of a Pediatric Malignancy

    ERIC Educational Resources Information Center

    Butler, Robert W.; Copeland, Donna R.; Fairclough, Diane L.; Mulhern, Raymond K.; Katz, Ernest R.; Kazak, Anne E.; Noll, Robert B.; Patel, Sunita K.; Sahler, Olle Jane Z.

    2008-01-01

    Survivors of childhood cancer whose malignancy and/or treatment involved the central nervous system may demonstrate a consistent pattern of neurocognitive deficits. The present study evaluated a randomized clinical trial of the Cognitive Remediation Program (CRP). Participants were 6- to 17-year-old survivors of childhood cancer (N = 161; 35%…

  14. Safety and Waste Management for SAM Chemistry Methods

    EPA Pesticide Factsheets

    The General Safety and Waste Management page offers section-specific safety and waste management details for the chemical analytes included in EPA's Selected Analytical Methods for Environmental Remediation and Recovery (SAM).

  15. Safety and Waste Management for SAM Radiochemical Methods

    EPA Pesticide Factsheets

    The General Safety and Waste Management page offers section-specific safety and waste management details for the radiochemical analytes included in EPA's Selected Analytical Methods for Environmental Remediation and Recovery (SAM).

  16. Progress and future direction for the interim safe storage and disposal of Hanford high-level waste

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kinzer, J.E.; Wodrich, D.D.; Bacon, R.F.

    This paper describes the progress made at the largest environmental cleanup program in the United States. Substantial advances in methods to start interim safe storage of Hanford Site high-level wastes, waste characterization to support both safety- and disposal-related information needs, and proceeding with cost-effective disposal by the U.S. Department of Energy (DOE) and its Hanford Site contractors, have been realized. Challenges facing the Tank Waste Remediation System (TWRS) Program, which is charged with the dual and parallel missions of interim safe storage and disposal of the high-level tank waste stored at the Hanford Site, are described. In these times ofmore » budget austerity, implementing an ongoing program that combines technical excellence and cost effectiveness is the near-term challenge. The technical initiatives and progress described in this paper are made more cost effective by DOE`s focus on work force productivity improvement, reduction of overhead costs, and reduction, integration and simplification of DOE regulations and operations requirements to more closely model those used in the private sector.« less

  17. Remedial action assessment system: Decision support for environmental cleanup

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pennock, K.A.; Bohn, S.; Franklin, A.L.

    1991-11-01

    A large number of hazardous waste sites across the United States await treatment. Waste sites can be physically complex entities composed of multiple, possibly interacting contaminants distributed throughout one or more media. The sites may be active as well with contaminants escaping through one or more potential escape paths. Treatment of these sites requires a long and costly commitment involving the coordination of activities among several waste treatment professionals. In order to reduce the cost and time required for the specification of treatment at these waste sites. The Remedial Action Assessment System (RAAS) was proposed. RAAS is an automated informationmore » management system which utilizes a combination of expert reasoning and numerical models to produce the combinations of treatment technologies, known as treatment trains, which satisfy the treatment objectives of a particular site. In addition, RAAS supports the analysis of these trains with regard to effectiveness and cost so that the viable treatment trains can be measured against each other. The Remedial Action Assessment System is a hybrid system designed and constructed using object-oriented tools and techniques. RAAS is advertised as a hybrid system because it combines, in integral fashion, numerical computing (primarily quantitative models) with expert system reasoning. An object-oriented approach was selected due to many of its inherent advantages, among these the naturalness of modeling physical objects and processes.« less

  18. Mine Waste Technology Program Electrochemical Tailings Cover

    EPA Science Inventory

    This report summarizes the results of Mine Waste Technology Program (MWTP) Activity III, Project 40, Electrochemical Tailings Cover, funded by the U.S. Environmental Protection Agency (EPA) and jointly administered by EPA and the U.S. Department of Energy (DOE). MSE Technology A...

  19. Rethinking Remediation: A Model to Support the Detailed Diagnosis of Clinicians' Performance Problems and the Development of Effective Remediation Plans.

    PubMed

    Prescott-Clements, Linda; Voller, Vicky; Bell, Mark; Nestors, Natasha; van der Vleuten, Cees P M

    2017-01-01

    The successful remediation of clinicians demonstrating poor performance in the workplace is essential to ensure the provision of safe patient care. Clinicians may develop performance problems for numerous reasons, including health, personal factors, the workplace environment, or outdated knowledge/skills. Performance problems are often complex involving multifactorial issues, encompassing knowledge, skills, and professional behaviors. It is important that (where possible and appropriate) clinicians are supported through effective remediation to return them to safe clinical practice. A review of the literature demonstrated that research into remediation is in its infancy, with little known about the effectiveness of remediation programs currently. Current strategies for the development of remediation programs are mostly "intuitive"; a few draw upon established theories to inform their approach. Similarly, although it has been established that identification of the nature/scope of performance problems through assessment is an essential first step within remediation, the need for a more widespread "diagnosis" of why the problems exist is emerging. These reasons for poor performance, particularly in the context of experienced practicing clinicians, are likely to have an impact on the potential success of remediation and should be considered within the "diagnosis." A new model for diagnosing the performance problems of the clinicians has been developed, using behavioral change theories to explore known barriers to successful remediation, such as insight, motivation, attitude, self-efficacy, and the working environment, in addition to addressing known deficits regarding knowledge and skills. This novel approach is described in this article. An initial feasibility study has demonstrated the acceptability and practical implementation of our model.

  20. National low-level waste management program radionuclide report series, Volume 15: Uranium-238

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adams, J.P.

    1995-09-01

    This report, Volume 15 of the National Low-Level Waste Management Program Radionuclide Report Series, discusses the radiological and chemical characteristics of uranium-238 ({sup 238}U). The purpose of the National Low-Level Waste Management Program Radionuclide Report Series is to provide information to state representatives and developers of low-level radioactive waste disposal facilities about the radiological, chemical, and physical characteristics of selected radionuclides and their behavior in the waste disposal facility environment. This report also includes discussions about waste types and forms in which {sup 238}U can be found, and {sup 238}U behavior in the environment and in the human body.

  1. Urban Blight Remediation as a Cost-Beneficial Solution to Firearm Violence.

    PubMed

    Branas, Charles C; Kondo, Michelle C; Murphy, Sean M; South, Eugenia C; Polsky, Daniel; MacDonald, John M

    2016-12-01

    To determine if blight remediation of abandoned buildings and vacant lots can be a cost-beneficial solution to firearm violence in US cities. We performed quasi-experimental analyses of the impacts and economic returns on investment of urban blight remediation programs involving 5112 abandoned buildings and vacant lots on the occurrence of firearm and nonfirearm violence in Philadelphia, Pennsylvania, from 1999 to 2013. We adjusted before-after percent changes and returns on investment in treated versus control groups for sociodemographic factors. Abandoned building remediation significantly reduced firearm violence -39% (95% confidence interval [CI] = -28%, -50%; P < .05) as did vacant lot remediation (-4.6%; 95% CI = -4.2%, -5.0%; P < .001). Neither program significantly affected nonfirearm violence. Respectively, taxpayer and societal returns on investment for the prevention of firearm violence were $5 and $79 for every dollar spent on abandoned building remediation and $26 and $333 for every dollar spent on vacant lot remediation. Abandoned buildings and vacant lots are blighted structures seen daily by urban residents that may create physical opportunities for violence by sheltering illegal activity and illegal firearms. Urban blight remediation programs can be cost-beneficial strategies that significantly and sustainably reduce firearm violence.

  2. Urban Blight Remediation as a Cost-Beneficial Solution to Firearm Violence

    PubMed Central

    Kondo, Michelle C.; Murphy, Sean M.; South, Eugenia C.; Polsky, Daniel; MacDonald, John M.

    2016-01-01

    Objectives. To determine if blight remediation of abandoned buildings and vacant lots can be a cost-beneficial solution to firearm violence in US cities. Methods. We performed quasi-experimental analyses of the impacts and economic returns on investment of urban blight remediation programs involving 5112 abandoned buildings and vacant lots on the occurrence of firearm and nonfirearm violence in Philadelphia, Pennsylvania, from 1999 to 2013. We adjusted before–after percent changes and returns on investment in treated versus control groups for sociodemographic factors. Results. Abandoned building remediation significantly reduced firearm violence −39% (95% confidence interval [CI] = −28%, −50%; P < .05) as did vacant lot remediation (−4.6%; 95% CI = −4.2%, −5.0%; P < .001). Neither program significantly affected nonfirearm violence. Respectively, taxpayer and societal returns on investment for the prevention of firearm violence were $5 and $79 for every dollar spent on abandoned building remediation and $26 and $333 for every dollar spent on vacant lot remediation. Conclusions. Abandoned buildings and vacant lots are blighted structures seen daily by urban residents that may create physical opportunities for violence by sheltering illegal activity and illegal firearms. Urban blight remediation programs can be cost-beneficial strategies that significantly and sustainably reduce firearm violence. PMID:27736217

  3. Innovative mathematical modeling in environmental remediation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yeh, Gour T.; National Central Univ.; Univ. of Central Florida

    2013-05-01

    There are two different ways to model reactive transport: ad hoc and innovative reaction-based approaches. The former, such as the Kd simplification of adsorption, has been widely employed by practitioners, while the latter has been mainly used in scientific communities for elucidating mechanisms of biogeochemical transport processes. It is believed that innovative mechanistic-based models could serve as protocols for environmental remediation as well. This paper reviews the development of a mechanistically coupled fluid flow, thermal transport, hydrologic transport, and reactive biogeochemical model and example-applications to environmental remediation problems. Theoretical bases are sufficiently described. Four example problems previously carried out aremore » used to demonstrate how numerical experimentation can be used to evaluate the feasibility of different remediation approaches. The first one involved the application of a 56-species uranium tailing problem to the Melton Branch Subwatershed at Oak Ridge National Laboratory (ORNL) using the parallel version of the model. Simulations were made to demonstrate the potential mobilization of uranium and other chelating agents in the proposed waste disposal site. The second problem simulated laboratory-scale system to investigate the role of natural attenuation in potential off-site migration of uranium from uranium mill tailings after restoration. It showed inadequacy of using a single Kd even for a homogeneous medium. The third example simulated laboratory experiments involving extremely high concentrations of uranium, technetium, aluminum, nitrate, and toxic metals (e.g.,Ni, Cr, Co).The fourth example modeled microbially-mediated immobilization of uranium in an unconfined aquifer using acetate amendment in a field-scale experiment. The purposes of these modeling studies were to simulate various mechanisms of mobilization and immobilization of radioactive wastes and to illustrate how to apply reactive transport

  4. RADIOACTIVE WASTE MANAGEMENT IN THE CHERNOBYL EXCLUSION ZONE - 25 YEARS SINCE THE CHERNOBYL NUCLEAR POWER PLANT ACCIDENT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Farfan, E.; Jannik, T.

    2011-10-01

    Radioactive waste management is an important component of the Chernobyl Nuclear Power Plant accident mitigation and remediation activities of the so-called Chernobyl Exclusion Zone. This article describes the localization and characteristics of the radioactive waste present in the Chernobyl Exclusion Zone and summarizes the pathways and strategy for handling the radioactive waste related problems in Ukraine and the Chernobyl Exclusion Zone, and in particular, the pathways and strategies stipulated by the National Radioactive Waste Management Program. The brief overview of the radioactive waste issues in the ChEZ presented in this article demonstrates that management of radioactive waste resulting from amore » beyond-designbasis accident at a nuclear power plant becomes the most challenging and the costliest effort during the mitigation and remediation activities. The costs of these activities are so high that the provision of radioactive waste final disposal facilities compliant with existing radiation safety requirements becomes an intolerable burden for the current generation of a single country, Ukraine. The nuclear accident at the Fukushima-1 NPP strongly indicates that accidents at nuclear sites may occur in any, even in a most technologically advanced country, and the Chernobyl experience shows that the scope of the radioactive waste management activities associated with the mitigation of such accidents may exceed the capabilities of a single country. Development of a special international program for broad international cooperation in accident related radioactive waste management activities is required to handle these issues. It would also be reasonable to consider establishment of a dedicated international fund for mitigation of accidents at nuclear sites, specifically, for handling radioactive waste problems in the ChEZ. The experience of handling Chernobyl radioactive waste management issues, including large volumes of radioactive soils and complex

  5. OVERVIEW OF HAZARDOUS/TOXIC WASTE INCINERATION

    EPA Science Inventory

    Effective hazardous/toxic waste disposal and safe dumpsite cleanup are two of EPA's major missions in the 1980s. Incineration has been recognized as a very efficient process to destroy the hazardous wastes generated by industry or by the dumpsite remediations. The paper provides ...

  6. High Stakes, High Performance: Making Remedial Education Work.

    ERIC Educational Resources Information Center

    Roueche, John E.; Roueche, Suanne D.

    The American Association of Community Colleges commissioned this study of remedial education in community colleges as a framework for describing context, generating discussion, and encouraging improvement. The study reviews current research about open-door policies, underprepared students, faculty, and remedial programs. It also argues that…

  7. Integrated Study of the Potential Application of Remediated CCA Treated Spruce Wood in MDF Production

    Treesearch

    Ronald Sabo; Altaf H. Basta; Jerrold E. Winandy

    2013-01-01

    Public health awareness has increased in the past few years regarding the disposal of chromated copper arsenate (CCA) preservative-treated wood wastes. This study demonstrates the potential for using remediated CCA lumber and alternative fiber sources, such as sugar cane bagasse, to produce medium density fiberboard (MDF). The role of both remediated CCA loaded spruce...

  8. General Safety and Waste Management Related to SAM

    EPA Pesticide Factsheets

    The General Safety and Waste Management page offers section-specific safety and waste management details for chemicals, radiochemicals, pathogens, and biotoxins included in EPA's Selected Analytical Methods for Environmental Remediation and Recovery (SAM).

  9. Dynamic analysis for solid waste management systems: an inexact multistage integer programming approach.

    PubMed

    Li, Yongping; Huang, Guohe

    2009-03-01

    In this study, a dynamic analysis approach based on an inexact multistage integer programming (IMIP) model is developed for supporting municipal solid waste (MSW) management under uncertainty. Techniques of interval-parameter programming and multistage stochastic programming are incorporated within an integer-programming framework. The developed IMIP can deal with uncertainties expressed as probability distributions and interval numbers, and can reflect the dynamics in terms of decisions for waste-flow allocation and facility-capacity expansion over a multistage context. Moreover, the IMIP can be used for analyzing various policy scenarios that are associated with different levels of economic consequences. The developed method is applied to a case study of long-term waste-management planning. The results indicate that reasonable solutions have been generated for binary and continuous variables. They can help generate desired decisions of system-capacity expansion and waste-flow allocation with a minimized system cost and maximized system reliability.

  10. THE POSITIVE IMPACTS OF AMERICAN REINVESTMENT AND RECOVERY ACT (ARRA) FUNDING TO THE WASTE MANAGEMENT PROGRAM ON HANFORD'S PLATEAU REMEDIATION PROJECT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BLACKFORD LT

    In April 2009, the Department of Energy (DOE) Richland Operations Office (RL) was allocated $1.6 billion (B) in ARRA funding to be applied to cleanup projects at the Hanford Site. DOE-RL selected projects to receive ARRA funding based on 3-criteria: creating/saving jobs, reducing the footprint of the Hanford Site, and reducing life-cycle costs for cleanup. They further selected projects that were currently covered under regulatory documents and existing prime contracts, which allowed work to proceed quickly. CH2M HILL Plateau Remediation Company (CHPRC) is a prime contractor to the DOE focused on the environmental cleanup of the DOE Hanford Site Centralmore » Plateau. CHPRC was slated to receive $1.36B in ARRA funding. As of January, 2010, CHPRC has awarded over $200 million (M) in subcontracts (64% to small businesses), created more that 1,100 jobs, and touched more than 2,300 lives - all in support of long-term objectives for remediation of the Central Plateau, on or ahead of schedule. ARRA funding is being used to accelerate and augment cleanup activities already underway under the baseline Plateau Remediation Contract (PRC). This paper details challenges and accomplishments using ARRA funding to meet DOE-RL objectives of creating/saving jobs, expediting cleanup, and reducing lifecycle costs for cleanup during the first months of implementation.« less

  11. Career Assessment, Remediation, Education, Employment, and Re-entry Program (CAREER). El Paso Community College Career Grant. Final Report.

    ERIC Educational Resources Information Center

    LaFleur, Carol A.

    Objectives of the Career Assessment, Remediation, Education, Employment, and Re-entry (CAREER) project were to establish a series of intensive, short-term job training programs using competency-based instruction to serve Hispanic persons who were economically disadvantaged, displaced, unemployed, or underemployed, as well as Hispanic females who…

  12. Legislative aspects of hazardous waste management.

    PubMed Central

    Friedman, M

    1983-01-01

    In the fall of 1976 Congress enacted the Resource Conservation and Recovery Act, commonly referred to as RCRA. The objective of the statute is to create an orderly system for the generation, handling and disposal of hazardous waste by means of a comprehensive tracking and record keeping mechanism. RCRA does not regulate directly by statute so much as it delegates rule making authority to the U.S. Environmental Protection Agency. Pursuant to its mandate to develop regulations in accordance with the broad criteria of RCRA, EPA has published extensive regulations. These regulations address hazardous waste generation, transportation, treatment, storage and handling and its final disposal. The statute also offers remedies available to both EPA and the public at large to ensure enforcement of the provisions of RCRA and the EPA regulations. Additionally, it sets guidelines for states to implement their own hazardous waste management programs. This article is intended to introduce this complicated statutory/regulatory package to scientists and health professionals. It outlines the provisions of RCRA and the EPA regulations, abbreviates early judicial decisions interpreting these provisions and sets forth a brief description of various state approaches to hazardous waste management. PMID:6825630

  13. What is the Prevalence and Success of Remediation of Emergency Medicine Residents?

    PubMed Central

    Silverberg, Mark; Weizberg, Moshe; Murano, Tiffany; Smith, Jessica L.; Burkhardt, John C.; Santen, Sally A.

    2015-01-01

    Introduction The primary objective of this study was to determine the prevalence of remediation, competency domains for remediation, the length, and success rates of remediation in emergency medicine (EM). Methods We developed the survey in Surveymonkey™ with attention to content and response process validity. EM program directors responded how many residents had been placed on remediation in the last three years. Details regarding the remediation were collected including indication, length and success. We reported descriptive data and estimated a multinomial logistic regression model. Results We obtained 126/158 responses (79.7%). Ninety percent of programs had at least one resident on remediation in the last three years. The prevalence of remediation was 4.4%. Indications for remediation ranged from difficulties with one core competency to all six competencies (mean 1.9). The most common were medical knowledge (MK) (63.1% of residents), patient care (46.6%) and professionalism (31.5%). Mean length of remediation was eight months (range 1–36 months). Successful remediation was 59.9% of remediated residents; 31.3% reported ongoing remediation. In 8.7%, remediation was deemed “unsuccessful.” Training year at time of identification for remediation (post-graduate year [PGY] 1), longer time spent in remediation, and concerns with practice-based learning (PBLI) and professionalism were found to have statistically significant association with unsuccessful remediation. Conclusion Remediation in EM residencies is common, with the most common areas being MK and patient care. The majority of residents are successfully remediated. PGY level, length of time spent in remediation, and the remediation of the competencies of PBLI and professionalism were associated with unsuccessful remediation. PMID:26594275

  14. 24 CFR 1003.703 - Other remedies for noncompliance.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Other remedies for noncompliance. 1003.703 Section 1003.703 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN... Program Performance § 1003.703 Other remedies for noncompliance. (a) Secretarial actions. If the Secretary...

  15. Lessons Learned: Tribal Community Engagement, Remediation and Restoration of a Uranium Mine Tailings Site, Navajo Nation - 12484

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wadsworth, Donald K.; Hicks, Allison H.

    2012-07-01

    In May, 2011 New World Environmental Inc. was awarded a contract by the Navajo Nation Environmental Protection Agency to remediate an illegal radioactive waste disposal site located in the Navajo Nation. The initial scope included the excavation and shipment of an estimated 3,000 cubic yards of Uranium mine tailings and associated industrial waste. In this instance Stakeholders were supportive of the project, remediation and restoration, yet the movement of residual radioactive materials through tribal communities was a controversial issue. Other Stakeholder issues included site security, water sources for remediation activities, local residents' temporary re-location and care of livestock, right ofmore » way permissions and local workforce development. This presentation recaps the technical and non-technical issues encountered in the remediation and restoration the seven acre site and the outreach to surrounding communities. Cultural and equity issues resulting from historical problems associated with this and other sites in the immediate area and education and training. (authors)« less

  16. Capacity planning for waste management systems: an interval fuzzy robust dynamic programming approach.

    PubMed

    Nie, Xianghui; Huang, Guo H; Li, Yongping

    2009-11-01

    This study integrates the concepts of interval numbers and fuzzy sets into optimization analysis by dynamic programming as a means of accounting for system uncertainty. The developed interval fuzzy robust dynamic programming (IFRDP) model improves upon previous interval dynamic programming methods. It allows highly uncertain information to be effectively communicated into the optimization process through introducing the concept of fuzzy boundary interval and providing an interval-parameter fuzzy robust programming method for an embedded linear programming problem. Consequently, robustness of the optimization process and solution can be enhanced. The modeling approach is applied to a hypothetical problem for the planning of waste-flow allocation and treatment/disposal facility expansion within a municipal solid waste (MSW) management system. Interval solutions for capacity expansion of waste management facilities and relevant waste-flow allocation are generated and interpreted to provide useful decision alternatives. The results indicate that robust and useful solutions can be obtained, and the proposed IFRDP approach is applicable to practical problems that are associated with highly complex and uncertain information.

  17. Iraq liquid radioactive waste tanks maintenance and monitoring program plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dennis, Matthew L.; Cochran, John Russell; Sol Shamsaldin, Emad

    2011-10-01

    The purpose of this report is to develop a project management plan for maintaining and monitoring liquid radioactive waste tanks at Iraq's Al-Tuwaitha Nuclear Research Center. Based on information from several sources, the Al-Tuwaitha site has approximately 30 waste tanks that contain varying amounts of liquid or sludge radioactive waste. All of the tanks have been non-operational for over 20 years and most have limited characterization. The program plan embodied in this document provides guidance on conducting radiological surveys, posting radiation control areas and controlling access, performing tank hazard assessments to remove debris and gain access, and conducting routine tankmore » inspections. This program plan provides general advice on how to sample and characterize tank contents, and how to prioritize tanks for soil sampling and borehole monitoring.« less

  18. Maywood Interim Storage Site annual environmental report for calendar year 1991, Maywood, New Jersey. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-01

    This document describes the environmental monitoring program at the Maywood Interim Storage Site (MISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of MISS began in 1984 when congress added the site to the US Department of Energy`s (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a DOE program to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at MISS includesmore » sampling networks for radon and thoron concentrations in air; external gamma radiation-exposure; and total uranium, radium-226, radium-228, thorium-232, and thorium-230 concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in surface water, sediment, and groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards are established to protect public health and the environment.« less

  19. FSILP: fuzzy-stochastic-interval linear programming for supporting municipal solid waste management.

    PubMed

    Li, Pu; Chen, Bing

    2011-04-01

    Although many studies on municipal solid waste management (MSW management) were conducted under uncertain conditions of fuzzy, stochastic, and interval coexistence, the solution to the conventional linear programming problems of integrating fuzzy method with the other two was inefficient. In this study, a fuzzy-stochastic-interval linear programming (FSILP) method is developed by integrating Nguyen's method with conventional linear programming for supporting municipal solid waste management. The Nguyen's method was used to convert the fuzzy and fuzzy-stochastic linear programming problems into the conventional linear programs, by measuring the attainment values of fuzzy numbers and/or fuzzy random variables, as well as superiority and inferiority between triangular fuzzy numbers/triangular fuzzy-stochastic variables. The developed method can effectively tackle uncertainties described in terms of probability density functions, fuzzy membership functions, and discrete intervals. Moreover, the method can also improve upon the conventional interval fuzzy programming and two-stage stochastic programming approaches, with advantageous capabilities that are easily achieved with fewer constraints and significantly reduces consumption time. The developed model was applied to a case study of municipal solid waste management system in a city. The results indicated that reasonable solutions had been generated. The solution can help quantify the relationship between the change of system cost and the uncertainties, which could support further analysis of tradeoffs between the waste management cost and the system failure risk. Copyright © 2010 Elsevier Ltd. All rights reserved.

  20. The US DOE EM international program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elmetti, Rosa R.; Han, Ana M.; Roach, Jay A.

    2013-07-01

    The U.S. Department of Energy (DOE) Office of Environmental Management (EM) conducts international collaboration activities in support of U.S. policies and objectives regarding the accelerated risk reduction and remediation of environmental legacy of the nations' nuclear weapons program and government sponsored nuclear energy research. The EM International Program supported out of the EM Office of the Associate Principal Deputy Assistant Secretary pursues collaborations with foreign government organizations, educational institutions and private industry to assist in identifying technologies and promote international collaborations that leverage resources and link international experience and expertise. In fiscal year (FY) 2012, the International Program awarded eightmore » international collaborative projects for work scope spanning waste processing, groundwater and soil remediation, deactivation and decommissioning (D and D) and nuclear materials disposition initiatives to seven foreign organizations. Additionally, the International Program's scope and collaboration opportunities were expanded to include technical as well as non-technical areas. This paper will present an overview of the on-going tasks awarded in FY 2012 and an update of upcoming international activities and opportunities for expansion into the remainder of FY 2013 and beyond. (authors)« less

  1. Strategic considerations for the sustainable remediation of nuclear installations.

    PubMed

    Mobbs, S; Orr, P; Weber, I

    2017-08-05

    Nuclear sites around the world are being decommissioned and remedial actions are being undertaken to enable the sites or parts of the sites to be reused. Although this is relatively straightforward for most sites, experience has suggested that preventative action is needed to minimise the impact of remediation activities on the environment and the potential burden to future generations. Removing all contamination in order to make a site suitable for any use generates waste and has associated environmental, social and economic detriments and benefits that should be taken into account. Recent experience of OECD Nuclear Energy Agency (NEA) member countries in the remediation of contaminated land, predominantly contaminated soil and groundwater, on nuclear sites during decommissioning has been assessed by an NEA task group. The experience was used to identify strategic considerations for nuclear site remediation, to consider the application of sustainability principles to nuclear site remediation, to describe good practice, and to make recommendations for further research and development. The key aspects that were identified were that 1) site remediation should be sustainable by resulting in an overall net benefit; and 2) an adaptive approach is essential in order to take into account the inherent uncertainty associated with the decommissioning and site remediation timescales. A report describing the findings was published by OECD/NEA in 2016. The conclusions provide insights to decision makers, regulators, implementers and stakeholders involved in nuclear site decommissioning so that they can achieve sustainable remediation of nuclear sites, now and in the future. Copyright © 2017 Elsevier Ltd. All rights reserved.

  2. Biogeochemical aspects of uranium mineralization, mining, milling, and remediation

    USGS Publications Warehouse

    Campbell, Kate M.; Gallegos, Tanya J.; Landa, Edward R.

    2015-01-01

    Natural uranium (U) occurs as a mixture of three radioactive isotopes: 238U, 235U, and 234U. Only 235U is fissionable and makes up about 0.7% of natural U, while 238U is overwhelmingly the most abundant at greater than 99% of the total mass of U. Prior to the 1940s, U was predominantly used as a coloring agent, and U-bearing ores were mined mainly for their radium (Ra) and/or vanadium (V) content; the bulk of the U was discarded with the tailings (Finch et al., 1972). Once nuclear fission was discovered, the economic importance of U increased greatly. The mining and milling of U-bearing ores is the first step in the nuclear fuel cycle, and the contact of residual waste with natural water is a potential source of contamination of U and associated elements to the environment. Uranium is mined by three basic methods: surface (open pit), underground, and solution mining (in situ leaching or in situ recovery), depending on the deposit grade, size, location, geology and economic considerations (Abdelouas, 2006). Solid wastes at U mill tailings (UMT) sites can include both standard tailings (i.e., leached ore rock residues) and solids generated on site by waste treatment processes. The latter can include sludge or “mud” from neutralization of acidic mine/mill effluents, containing Fe and a range of coprecipitated constituents, or barium sulfate precipitates that selectively remove Ra (e.g., Carvalho et al., 2007). In this chapter, we review the hydrometallurgical processes by which U is extracted from ore, the biogeochemical processes that can affect the fate and transport of U and associated elements in the environment, and possible remediation strategies for site closure and aquifer restoration.This paper represents the fourth in a series of review papers from the U.S. Geological Survey (USGS) on geochemical aspects of UMT management that span more than three decades. The first paper (Landa, 1980) in this series is a primer on the nature of tailings and radionuclide

  3. Modularizing Remedial Mathematics

    ERIC Educational Resources Information Center

    Wong, Aaron

    2013-01-01

    As remedial mathematics education has become an increasingly important topic of conversation in higher education. Mathematics departments have been put under increased pressure to change their programs to increase the student success rate. A number of models have been introduced over the last decade that represent a wide range of new ideas and…

  4. SLFP: a stochastic linear fractional programming approach for sustainable waste management.

    PubMed

    Zhu, H; Huang, G H

    2011-12-01

    A stochastic linear fractional programming (SLFP) approach is developed for supporting sustainable municipal solid waste management under uncertainty. The SLFP method can solve ratio optimization problems associated with random information, where chance-constrained programming is integrated into a linear fractional programming framework. It has advantages in: (1) comparing objectives of two aspects, (2) reflecting system efficiency, (3) dealing with uncertainty expressed as probability distributions, and (4) providing optimal-ratio solutions under different system-reliability conditions. The method is applied to a case study of waste flow allocation within a municipal solid waste (MSW) management system. The obtained solutions are useful for identifying sustainable MSW management schemes with maximized system efficiency under various constraint-violation risks. The results indicate that SLFP can support in-depth analysis of the interrelationships among system efficiency, system cost and system-failure risk. Copyright © 2011 Elsevier Ltd. All rights reserved.

  5. Waste isolation safety assessment program. Task 4. Third contractor information meeting

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1980-06-01

    The Contractor Information Meeting (October 14 to 17, 1979) was part of the FY-1979 effort of Task 4 of the Waste Isolation Safety Assessment Program (WISAP): Sorption/Desorption Analysis. The objectives of this task are to: evaluate sorption/desorption measurement methods and develop a standardized measurement procedure; produce a generic data bank of nuclide-geologic interactions using a wide variety of geologic media and groundwaters; perform statistical analysis and synthesis of these data; perform validation studies to compare short-term laboratory studies to long-term in situ behavior; develop a fundamental understanding of sorption/desorption processes; produce x-ray and gamma-emitting isotopes suitable for the study ofmore » actinides at tracer concentrations; disseminate resulting information to the international technical community; and provide input data support for repository safety assessment. Conference participants included those subcontracted to WISAP Task 4, representatives and independent subcontractors to the Office of Nuclear Waste Isolation, representatives from other waste disposal programs, and experts in the area of waste/geologic media interaction. Since the meeting, WISAP has been divided into two programs: Assessment of Effectiveness of Geologic Isolation Systems (AEGIS) (modeling efforts) and Waste/Rock Interactions Technology (WRIT) (experimental work). The WRIT program encompasses the work conducted under Task 4. This report contains the information presented at the Task 4, Third Contractor Information Meeting. Technical Reports from the subcontractors, as well as Pacific Northwest Laboratory (PNL), are provided along with transcripts of the question-and-answer sessions. The agenda and abstracts of the presentations are also included. Appendix A is a list of the participants. Appendix B gives an overview of the WRIT program and details the WRIT work breakdown structure for 1980.« less

  6. Bioremediation: a genuine technology to remediate radionuclides from the environment.

    PubMed

    Prakash, Dhan; Gabani, Prashant; Chandel, Anuj K; Ronen, Zeev; Singh, Om V

    2013-07-01

    Radionuclides in the environment are a major human and environmental health concern. Like the Chernobyl disaster of 1986, the Fukushima Daiichi nuclear disaster in 2011 is once again causing damage to the environment: a large quantity of radioactive waste is being generated and dumped into the environment, and if the general population is exposed to it, may cause serious life-threatening disorders. Bioremediation has been viewed as the ecologically responsible alternative to environmentally destructive physical remediation. Microorganisms carry endogenous genetic, biochemical and physiological properties that make them ideal agents for pollutant remediation in soil and groundwater. Attempts have been made to develop native or genetically engineered (GE) microbes for the remediation of environmental contaminants including radionuclides. Microorganism-mediated bioremediation can affect the solubility, bioavailability and mobility of radionuclides. Therefore, we aim to unveil the microbial-mediated mechanisms for biotransformation of radionuclides under various environmental conditions as developing strategies for waste management of radionuclides. A discussion follows of '-omics'-integrated genomics and proteomics technologies, which can be used to trace the genes and proteins of interest in a given microorganism towards a cell-free bioremediation strategy. © 2013 The Authors. Microbial Biotechnology published by John Wiley & Sons Ltd and Society for Applied Microbiology.

  7. 32 CFR 310.45 - Administrative remedies.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED) PRIVACY PROGRAM DOD PRIVACY PROGRAM Privacy Act Violations § 310.45 Administrative remedies. Any individual who... employee concerning any right granted by this part shall be permitted to seek relief through appropriate...

  8. Risk assessment and optimization (ALARA) analysis for the environmental remediation of Brookhaven National Laboratory`s hazardous waste management facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dionne, B.J.; Morris, S.C. III; Baum, J.W.

    1998-01-01

    The Department of Energy`s (DOE) Office of Environment, Safety, and Health (EH) sought examples of risk-based approaches to environmental restoration to include in their guidance for DOE nuclear facilities. Extensive measurements of radiological contamination in soil and ground water have been made at Brookhaven National Laboratory`s Hazardous Waste Management Facility (HWMF) as part of a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation process. This provided an ideal opportunity for a case study. This report provides a risk assessment and an {open_quotes}As Low as Reasonably Achievable{close_quotes} (ALARA) analysis for use at other DOE nuclear facilities as an example ofmore » a risk-based decision technique. This document contains the Appendices for the report.« less

  9. Defining Uniform Processes for Remediation, Probation and Termination in Residency Training

    PubMed Central

    Smith, Jessica L.; Lypson, Monica; Silverberg, Mark; Weizberg, Moshe; Murano, Tiffany; Lukela, Michael; Santen, Sally A.

    2017-01-01

    It is important that residency programs identify trainees who progress appropriately, as well as identify residents who fail to achieve educational milestones as expected so they may be remediated. The process of remediation varies greatly across training programs, due in part to the lack of standardized definitions for good standing, remediation, probation, and termination. The purpose of this educational advancement is to propose a clear remediation framework including definitions, management processes, documentation expectations and appropriate notifications. Informal remediation is initiated when a resident’s performance is deficient in one or more of the outcomes-based milestones established by the Accreditation Council for Graduate Medical Education, but not significant enough to trigger formal remediation. Formal remediation occurs when deficiencies are significant enough to warrant formal documentation because informal remediation failed or because issues are substantial. The process includes documentation in the resident’s file and notification of the graduate medical education office; however, the documentation is not disclosed if the resident successfully remediates. Probation is initiated when a resident is unsuccessful in meeting the terms of formal remediation or if initial problems are significant enough to warrant immediate probation. The process is similar to formal remediation but also includes documentation extending to the final verification of training and employment letters. Termination involves other stakeholders and occurs when a resident is unsuccessful in meeting the terms of probation or if initial problems are significant enough to warrant immediate termination. PMID:28116019

  10. Defining Uniform Processes for Remediation, Probation and Termination in Residency Training.

    PubMed

    Smith, Jessica L; Lypson, Monica; Silverberg, Mark; Weizberg, Moshe; Murano, Tiffany; Lukela, Michael; Santen, Sally A

    2017-01-01

    It is important that residency programs identify trainees who progress appropriately, as well as identify residents who fail to achieve educational milestones as expected so they may be remediated. The process of remediation varies greatly across training programs, due in part to the lack of standardized definitions for good standing, remediation, probation, and termination . The purpose of this educational advancement is to propose a clear remediation framework including definitions, management processes, documentation expectations and appropriate notifications. Informal remediation is initiated when a resident's performance is deficient in one or more of the outcomes-based milestones established by the Accreditation Council for Graduate Medical Education, but not significant enough to trigger formal remediation. Formal remediation occurs when deficiencies are significant enough to warrant formal documentation because informal remediation failed or because issues are substantial. The process includes documentation in the resident's file and notification of the graduate medical education office; however, the documentation is not disclosed if the resident successfully remediates. Probation is initiated when a resident is unsuccessful in meeting the terms of formal remediation or if initial problems are significant enough to warrant immediate probation. The process is similar to formal remediation but also includes documentation extending to the final verification of training and employment letters. Termination involves other stakeholders and occurs when a resident is unsuccessful in meeting the terms of probation or if initial problems are significant enough to warrant immediate termination.

  11. Overview of technology modeling in the Remedial Action Assessment System (RAAS)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, C.D.; Bagaasen, L.M.; Chan, T.C.

    1994-08-01

    There are numerous hazardous waste sites under the jurisdiction of the US Department of Energy (DOE). To assist the cleanup of these sites in a more consistent, timely, and cost-effective manner, the Remedial Action Assessment System (RAAS) is being developed by the Pacific Northwest Laboratory (PNL). RAAS is a software tool designed to automate the initial technology selection within the remedial investigation/feasibility study (RI/FS) process. The software does several things for the user: (1) provides information about available remedial technologies, (2) sorts possible technologies to recommend a list of technologies applicable to a given site, (3) points out technical issuesmore » that may prevent the implementation of a technology, and (4) provides an estimate of the effectiveness of a given technology at a particular site. Information from RAAS can be used to compare remediation options and guide selection of technologies for further study.« less

  12. Deep Borehole Disposal Remediation Costs for Off-Normal Outcomes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Finger, John T.; Cochran, John R.; Hardin, Ernest

    2015-08-17

    This memo describes rough-order-of-magnitude (ROM) cost estimates for a set of off-normal (accident) scenarios, as defined for two waste package emplacement method options for deep borehole disposal: drill-string and wireline. It summarizes the different scenarios and the assumptions made for each, with respect to fishing, decontamination, remediation, etc.

  13. Collaboration between the University Pre-Service Teacher Education Program and the Local Elementary School on English Remedial Education

    ERIC Educational Resources Information Center

    Chien, Chin-Wen

    2015-01-01

    This study analyzed 24 pre-service elementary school English teachers' design and delivery of remedial education to the fifth and sixth graders in the collaboration between the university pre-service teacher education program and the local elementary school in a city in northwest Taiwan. The pre-service teachers were encouraged by the elementary…

  14. 76 FR 6561 - North Carolina: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-07

    ... Carolina: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... authorization of the changes to its hazardous waste program under the Resource Conservation and Recovery Act... authorization during the comment period, the decision to authorize North Carolina's changes to its hazardous...

  15. 45 CFR 1303.4 - Remedies.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations Relating to Public Welfare (Continued) OFFICE OF HUMAN DEVELOPMENT SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION FOR CHILDREN, YOUTH AND FAMILIES, HEAD START PROGRAM APPEAL... from pursuing any other remedies authorized by law. ...

  16. The US DOE-EM International Program - 13004

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elmetti, Rosa R.; Han, Ana M.; Williams, Alice C.

    2013-07-01

    The U.S. Department of Energy (DOE) Office of Environmental Management (EM) conducts international collaboration activities in support of U.S. policies and objectives regarding the accelerated risk reduction and remediation of environmental legacy of the nations' nuclear weapons program and government sponsored nuclear energy research. The EM International Program supported out of the EM Office of the Associate Principal Deputy Assistant Secretary pursues collaborations with foreign government organizations, educational institutions and private industry to assist in identifying technologies and promote international collaborations that leverage resources and link international experience and expertise. In fiscal year (FY) 2012, the International Program awarded eightmore » international collaborative projects for work scope spanning waste processing, groundwater and soil remediation, deactivation and decommissioning (D and D) and nuclear materials disposition initiatives to seven foreign organizations. Additionally, the International Program's scope and collaboration opportunities were expanded to include technical as well as non-technical areas. This paper will present an overview of the on-going tasks awarded in FY 2012 and an update of upcoming international activities and opportunities for expansion into FY 2013 and beyond. (authors)« less

  17. A Program for Training Special Education Consultants in Remediating Academic and Social Behaviors of Handicapped Children. Final Report.

    ERIC Educational Resources Information Center

    Harris, Jasper W.; And Others

    Presented is the final report of a 4-year project to develop and evaluate a prototype program for training special education consultants who are qualified to assist school personnel and parents in remediating academic and social behaviors of handicapped children in the Kansas City (Missouri) area. An overview and introduction are provided in the…

  18. 41 CFR 101-8.723 - Remedial action by recipient.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 8-NONDISCRIMINATION IN PROGRAMS RECEIVING FEDERAL FINANCIAL ASSISTANCE 8.7-Discrimination Prohibited on the Basis of Age § 101-8.723 Remedial action... remedial action that GSA may require to overcome the effects of the discrimination. If another recipient...

  19. 41 CFR 101-8.723 - Remedial action by recipient.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 8-NONDISCRIMINATION IN PROGRAMS RECEIVING FEDERAL FINANCIAL ASSISTANCE 8.7-Discrimination Prohibited on the Basis of Age § 101-8.723 Remedial action... remedial action that GSA may require to overcome the effects of the discrimination. If another recipient...

  20. System description for DART (Decision Analysis for Remediation Technologies)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nonte, J.; Bolander, T.; Nickelson, D.

    1997-09-01

    DART is a computer aided system populated with influence models to determine quantitative benefits derived by matching requirements and technologies. The DART database is populated with data from over 900 DOE sites from 10 Field Offices. These sites are either source terms, such as buried waste pits, or soil or groundwater contaminated plumes. The data, traceable to published documents, consists of site-specific data (contaminants, area, volume, depth, size, remedial action dates, site preferred remedial option), problems (e.g., offsite contaminant plume), and Site Technology Coordinating Group (STCG) need statements (also contained in the Ten-Year Plan). DART uses this data to calculatemore » and derive site priorities, risk rankings, and site specific technology requirements. DART is also populated with over 900 industry and DOE SCFA technologies. Technology capabilities can be used to match technologies to waste sites based on the technology`s capability to meet site requirements and constraints. Queries may be used to access, sort, roll-up, and rank site data. Data roll-ups may be graphically displayed.« less

  1. A novel method of utilizing permeable reactive kiddle (PRK) for the remediation of acid mine drainage.

    PubMed

    Lee, Woo-Chun; Lee, Sang-Woo; Yun, Seong-Taek; Lee, Pyeong-Koo; Hwang, Yu Sik; Kim, Soon-Oh

    2016-01-15

    Numerous technologies have been developed and applied to remediate AMD, but each has specific drawbacks. To overcome the limitations of existing methods and improve their effectiveness, we propose a novel method utilizing permeable reactive kiddle (PRK). This manuscript explores the performance of the PRK method. In line with the concept of green technology, the PRK method recycles industrial waste, such as steel slag and waste cast iron. Our results demonstrate that the PRK method can be applied to remediate AMD under optimal operational conditions. Especially, this method allows for simple installation and cheap expenditure, compared with established technologies. Copyright © 2015 Elsevier B.V. All rights reserved.

  2. WASTE REDUCTION OF TECHNOLOGY EVALUATIONS OF THE U.S. EPA WRITE PROGRAM

    EPA Science Inventory

    The Waste Reduction Innovative Technology Evaluation (WRITE)Program was established in 1989 to provide objective, accurate performance and cost data about waste reducing technologies for a variety of industrial and commercial application. EPA's Risk Reduction Engineering Laborato...

  3. 77 FR 13200 - Texas: Final Authorization of State Hazardous Waste Management Program Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ....1. Such wastes are termed ``oil and gas wastes.'' The TCEQ has responsibility to administer the RCRA program, however, hazardous waste generated at natural gas or natural gas liquids processing plants or... with the exploration, development, or production of oil or gas or geothermal resources and other...

  4. Comprehensive Assessment of Struggling Learners Referred to a Graduate Medical Education Remediation Program.

    PubMed

    Warburton, Karen M; Goren, Eric; Dine, C Jessica

    2017-12-01

    Implementation of the Next Accreditation System has provided a standardized framework for identifying learners not meeting milestones, but there is as yet no corresponding framework for remediation. We developed a comprehensive assessment process that allows correct diagnosis of a struggling learner's deficit(s) to promote successful remediation. At the University of Pennsylvania, resident learners within the Department of Medicine who are not meeting milestones are referred to the Early Intervention Remediation Committee (EIRC). The EIRC, composed of 14 faculty members with expertise in remediation, uses a standardized process to assess learners' deficits. These faculty members categorize primary deficits as follows: medical knowledge, clinical reasoning, organization and efficiency, professionalism, and communication skills. The standardized process of assessment includes an analysis of the learner's file, direct communication with evaluators, an interview focused on learner perception of the problem, screening for underlying medical or psychosocial issues, and a review of systems for deficits in the 6 core competencies. Participants were surveyed after participating in this process. Over a 2-year period, the EIRC assessed and developed remediation plans for 4% of learners (14 of a total 342). Following remediation and reassessment, the identified problems were satisfactorily resolved in all cases with no disciplinary action. While the process was time intensive, an average of 45 hours per learner, the majority of faculty and residents rated it as positive and beneficial. This structured assessment process identifies targeted areas for remediation and adds to the tools available to Clinical Competency Committees.

  5. Factors Influencing Attitude, Safety Behavior, and Knowledge regarding Household Waste Management in Guinea: A Cross-Sectional Study

    PubMed Central

    Mamady, Keita

    2016-01-01

    Waste indiscriminate disposal is recognized as an important cause of environmental pollution and is associated with health problems. Safe management and disposal of household waste are an important problem to the capital city of Guinea (Conakry). The objective of this study was to identify socioeconomic and demographic factors associated with practice, knowledge, and safety behavior of family members regarding household waste management and to produce a remedial action plan. I found that no education background, income, and female individuals were independently associated with indiscriminate waste disposal. Unplanned residential area was an additional factor associated with indiscriminate waste disposal. I also found that the community residents had poor knowledge and unsafe behavior in relation to waste management. The promotion of environmental information and public education and implementation of community action programs on disease prevention and health promotion will enhance environmental friendliness and safety of the community. PMID:27092183

  6. Factors Influencing Attitude, Safety Behavior, and Knowledge regarding Household Waste Management in Guinea: A Cross-Sectional Study.

    PubMed

    Mamady, Keita

    2016-01-01

    Waste indiscriminate disposal is recognized as an important cause of environmental pollution and is associated with health problems. Safe management and disposal of household waste are an important problem to the capital city of Guinea (Conakry). The objective of this study was to identify socioeconomic and demographic factors associated with practice, knowledge, and safety behavior of family members regarding household waste management and to produce a remedial action plan. I found that no education background, income, and female individuals were independently associated with indiscriminate waste disposal. Unplanned residential area was an additional factor associated with indiscriminate waste disposal. I also found that the community residents had poor knowledge and unsafe behavior in relation to waste management. The promotion of environmental information and public education and implementation of community action programs on disease prevention and health promotion will enhance environmental friendliness and safety of the community.

  7. Sustainable multistage process for enhanced productivity of bioplastics from waste remediation through aerobic dynamic feeding strategy: Process integration for up-scaling.

    PubMed

    Amulya, K; Jukuri, Srinivas; Venkata Mohan, S

    2015-01-01

    Polyhydroxyalkanoates (PHA) production was evaluated in a multistage operation using food waste as a renewable feedstock. The first step involved the production of bio-hydrogen (bio-H2) via acidogenic fermentation. Volatile fatty acid (VFA) rich effluent from bio-H2 reactor was subsequently used for PHA production, which was carried out in two stages, Stage II (culture enrichment) and Stage III (PHA production). PHA-storing microorganisms were enriched in a sequencing batch reactor (SBR), operated at two different cycle lengths (CL-24; CL-12). Higher polymer recovery as well as VFA removal was achieved in CL-12 operation both in Stage II (16.3% dry cell weight (DCW); VFA removal, 84%) and Stage III (23.7% DCW; VFA removal, 88%). The PHA obtained was a co-polymer [P(3HB-co-3HV)] of PHB and PHV. The results obtained indicate that this integrated multistage process offers new opportunities to further leverage large scale PHA production with simultaneous waste remediation in the framework of biorefinery. Copyright © 2015 Elsevier Ltd. All rights reserved.

  8. To fail is human: remediating remediation in medical education.

    PubMed

    Kalet, Adina; Chou, Calvin L; Ellaway, Rachel H

    2017-12-01

    Remediating failing medical learners has traditionally been a craft activity responding to individual learner and remediator circumstances. Although there have been moves towards more systematic approaches to remediation (at least at the institutional level), these changes have tended to focus on due process and defensibility rather than on educational principles. As remediation practice evolves, there is a growing need for common theoretical and systems-based perspectives to guide this work. This paper steps back from the practicalities of remediation practice to take a critical systems perspective on remediation in contemporary medical education. In doing so, the authors acknowledge the complex interactions between institutional, professional, and societal forces that are both facilitators of and barriers to effective remediation practices. The authors propose a model that situates remediation within the contexts of society as a whole, the medical profession, and medical education institutions. They also outline a number of recommendations to constructively align remediation principles and practices, support a continuum of remediation practices, destigmatize remediation, and develop institutional communities of practice in remediation. Medical educators must embrace a responsible and accountable systems-level approach to remediation if they are to meet their obligations to provide a safe and effective physician workforce.

  9. Application of risk management techniques for the remediation of an old mining site in Greece.

    PubMed

    Panagopoulos, I; Karayannis, A; Adam, K; Aravossis, K

    2009-05-01

    This article summarizes the project and risk management of a remediation/reclamation project in Lavrion, Greece. In Thoricos the disposal of mining and metallurgical wastes in the past resulted in the contamination with heavy metals and acid mine drainage. The objective of this reclamation project was to transform this coastal zone from a contaminated site to an area suitable for recreation purposes. A separate risk assessment study was performed to provide the basis of determining the relevant environmental contamination and to rate the alternative remedial schemes involved. The study used both existing data available from comprehensive studies, as well as newly collected field data. For considering environmental risk, the isolation and minimization of risk option was selected, and a reclamation scheme, based on environmental criteria, was applied which was comprised of in situ neutralization, stabilization and cover of the potentially acid generating wastes and contaminated soils with a low permeability geochemical barrier. Additional measures were specifically applied in the areas where highly sulphidic wastes existed constituting active acid generation sources, which included the encapsulation of wastes in HDPE liners installed on clay layers.

  10. Ground Water Issue: Phytoremediation of Contaminated Soil and Ground Water at Hazardous Waste Sites

    DTIC Science & Technology

    2001-02-01

    Development Ground Water Issue Phytoremediation of Contaminated Soil and Ground Water at Hazardous Waste Sites National Risk Management Research... Phytoremediation , the use of plants in remediation, is one such technology. This issue paper focuses on the processes and applications of phytoremediation ...of phytoremediation as a cleanup or containment technique for remediation of hazardous waste sites. Introductory material on plant processes is

  11. Y-12 Site environmental protection program implementation plan (EPPIP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-11-01

    The Y-12 Plant Environmental Protection Program is conducted to: (1) protect public health and the environment from chemical and radiological releases occurring from current plant operations and past waste management and operational practices; (2) ensure compliance with federal, state, and local environmental regulations and DOE directives; (3) identify potential environmental problems; (4) evaluate existing environmental contamination and determine the need for remedial actions and mitigative measures; (5) monitor the progress of ongoing remedial actions and cleanup measures; and (6) inform the public of environmental issues relating to DOE operations. DOE Order 5400.1, General Environmental Protection Program, defines the general requirementsmore » for environmental protection programs at DOE facilities. This Environmental Protection Program Implementation Plan (EPPIP) defines the methods by which the Y-12 Plant staff will comply with the order by: (1) referencing environmental protection goals and objectives and identifying strategies and timetables for attaining them; (2) providing the overall framework for the design and implementation of the Y-12 Environmental Protection Program; and (3) assigning responsibilities for complying with the requirements of the order. The EPPIP is revised and updated annually.« less

  12. Libra: An Interdisciplinary Approach to Remediation

    ERIC Educational Resources Information Center

    Fisher, Dexter; Lamdin, Lois

    1974-01-01

    Describes a program at a community college in Bronx, New York in which English instructors and content area teachers work together to improve the writing of students needing remedial instruction. (RB)

  13. Factors Influencing Fluid Milk Waste in a Breakfast in the Classroom School Breakfast Program.

    PubMed

    Blondin, Stacy A; Goldberg, Jeanne P; Cash, Sean B; Griffin, Timothy S; Economos, Christina D

    2018-04-01

    To determine predictors of fluid milk waste in a Breakfast in the Classroom School Breakfast Program. Cross-sectional with 3 repeated measures/classroom. Elementary schools in a medium-sized, low-income, urban school district. Twenty third- through fourth-grade classrooms across 6 schools. Dependent variables include percentage of total and served milk wasted. Independent variables included observed daily menu offerings, program factors, and teacher and student behavior. Descriptive statistics were used to characterize variables across classrooms and schools. Multilevel mixed-effects models were used to test associations between predictors and outcomes of interest. P ≤ .05 was considered statistically significant. Total milk waste increased 12% when juice was offered and 3% for each additional carton of unserved milk. Teacher encouragement to take and/or consume breakfast was associated with a 5% and 9% increase in total and served milk waste, respectively. When students were engaged in other activities in addition to eating breakfast, total milk waste decreased 10%. Beverage offerings were predictive of greater total milk waste. Teacher and student behavior also appeared to influence milk consumption. Findings suggest that specific changes to School Breakfast Program implementation policies and practices could have an important role in waste mitigation. Copyright © 2018 Society for Nutrition Education and Behavior. Published by Elsevier Inc. All rights reserved.

  14. Waste management under multiple complexities: Inexact piecewise-linearization-based fuzzy flexible programming

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sun Wei; Huang, Guo H., E-mail: huang@iseis.org; Institute for Energy, Environment and Sustainable Communities, University of Regina, Regina, Saskatchewan, S4S 0A2

    2012-06-15

    Highlights: Black-Right-Pointing-Pointer Inexact piecewise-linearization-based fuzzy flexible programming is proposed. Black-Right-Pointing-Pointer It's the first application to waste management under multiple complexities. Black-Right-Pointing-Pointer It tackles nonlinear economies-of-scale effects in interval-parameter constraints. Black-Right-Pointing-Pointer It estimates costs more accurately than the linear-regression-based model. Black-Right-Pointing-Pointer Uncertainties are decreased and more satisfactory interval solutions are obtained. - Abstract: To tackle nonlinear economies-of-scale (EOS) effects in interval-parameter constraints for a representative waste management problem, an inexact piecewise-linearization-based fuzzy flexible programming (IPFP) model is developed. In IPFP, interval parameters for waste amounts and transportation/operation costs can be quantified; aspiration levels for net system costs, as well as tolerancemore » intervals for both capacities of waste treatment facilities and waste generation rates can be reflected; and the nonlinear EOS effects transformed from objective function to constraints can be approximated. An interactive algorithm is proposed for solving the IPFP model, which in nature is an interval-parameter mixed-integer quadratically constrained programming model. To demonstrate the IPFP's advantages, two alternative models are developed to compare their performances. One is a conventional linear-regression-based inexact fuzzy programming model (IPFP2) and the other is an IPFP model with all right-hand-sides of fussy constraints being the corresponding interval numbers (IPFP3). The comparison results between IPFP and IPFP2 indicate that the optimized waste amounts would have the similar patterns in both models. However, when dealing with EOS effects in constraints, the IPFP2 may underestimate the net system costs while the IPFP can estimate the costs more accurately. The comparison results between IPFP and IPFP3

  15. 77 FR 69765 - Colorado: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-21

    ... Protection Agency (EPA). ACTION: Final rule. SUMMARY: The Solid Waste Disposal Act, as amended, commonly... revised program application, subject to the limitations of the Hazardous and Solid Waste Amendments of... under the authority of sections 2002(a), 3006, and 7004(b) of the Solid Waste Disposal Act as amended 42...

  16. The Relationship between Post Reach Exit Exam (E[superscript 2]) Failure Remediation and NCLEX-RN Success of Graduates of Baccalaureate Nursing Programs

    ERIC Educational Resources Information Center

    Allen, Patricia Gale

    2009-01-01

    An ex post facto study was conducted to determine whether any relationship exists between remediation post Reach Exit Exam (E[superscript 2]) failure and NCLEX-RN success of graduates of baccalaureate nursing programs. Data was gathered from responses to the seventh annual validity study (V7S) offered to deans and directors of nursing programs by…

  17. Multiple-Component Remediation for Developmental Reading Disabilities: IQ, Socioeconomic Status, and Race as Factors in Remedial Outcome

    ERIC Educational Resources Information Center

    Morris, Robin D.; Lovett, Maureen W.; Wolf, Maryanne; Sevcik, Rose A.; Steinbach, Karen A.; Frijters, Jan C.; Shapiro, Marla B.

    2012-01-01

    Results from a controlled evaluation of remedial reading interventions are reported: 279 young disabled readers were randomly assigned to a program according to a 2 x 2 x 2 factorial design (IQ, socioeconomic status [SES], and race). The effectiveness of two multiple-component intervention programs for children with reading disabilities (PHAB +…

  18. Success of the Melton Valley Watershed Remediation at the ORNL - 12351

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adler, David; Wilkerson, Laura; Sims, Lynn

    2012-07-01

    The source remediation of the Melton Valley (MV) Watershed at the U.S. Department of Energy's (DOE's) Oak Ridge National Laboratory was completed 5 years ago (September 2006). Historic operations at the laboratory had resulted in chemical and radionuclide contaminant releases and potential risks or hazards within 175 contaminated units scattered across an area of 430 hectares (1062 acres) within the watershed. Contaminated areas included burial grounds, landfills, underground tanks, surface impoundments, liquid disposal pit/trenches, hydrofracture wells, leak and spill spites, inactive surface structures, and contaminated soil and sediments. The remediation of the watershed was detailed in the MV Interim Actionmore » Record of Decision (ROD) and included a combination of actions encompassing containment, isolation, stabilization, removal, and treatment of sources within the watershed and established the monitoring and land use controls that would result in protection of human health. The actions would take place over 5 years with an expenditure of over $340 M. The MV remedial actions left hazardous wastes in-place (e.g., buried wastes beneath hydraulic isolation caps) and cleanup at levels that do not allow for unrestricted access and unlimited exposure. The cleanup with the resultant land use would result in a comprehensive monitoring plan for groundwater, surface water, and biological media, as well as the tracking of the land use controls to assure their completion. This paper includes an overview of select performance measures and monitoring results, as detailed in the annual Remediation Effectiveness Report and the Five-Year Report. (authors)« less

  19. A model for prioritizing landfills for remediation and closure: A case study in Serbia.

    PubMed

    Ubavin, Dejan; Agarski, Boris; Maodus, Nikola; Stanisavljevic, Nemanja; Budak, Igor

    2018-01-01

    The existence of large numbers of landfills that do not fulfill sanitary prerequisites presents a serious hazard for the environment in lower income countries. One of the main hazards is landfill leachate that contains various pollutants and presents a threat to groundwater. Groundwater pollution from landfills depends on various mutually interconnected factors such as the waste type and amount, the amount of precipitation, the landfill location characteristics, and operational measures, among others. Considering these factors, lower income countries face a selection problem where landfills urgently requiring remediation and closure must be identified from among a large number of sites. The present paper proposes a model for prioritizing landfills for closure and remediation based on multicriteria decision making, in which the hazards of landfill groundwater pollution are evaluated. The parameters for the prioritization of landfills are the amount of waste disposed, the amount of precipitation, the vulnerability index, and the rate of increase of the amount of waste in the landfill. Verification was performed using a case study in Serbia where all municipal landfills were included and 128 landfills were selected for prioritization. The results of the evaluation of Serbian landfills, prioritizing sites for closure and remediation, are presented for the first time. Critical landfills are identified, and prioritization ranks for the selected landfills are provided. Integr Environ Assess Manag 2018;14:105-119. © 2017 SETAC. © 2017 SETAC.

  20. Crushing leads to waste disposal savings for FUSRAP

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Darby, J.

    1997-02-01

    In this article the author discusses the application of a rock crusher as a means of implementing cost savings in the remediation of FUSRAP sites. Transportation and offsite disposal costs are at present the biggest cost items in the remediation of FUSRAP sites. If these debris disposal problems can be handled in different manners, then remediation savings are available. Crushing can result in the ability to handle some wastes as soil disposal problems, which have different disposal regulations, thereby permitting cost savings.