  1. Renewable Energy in China: Xiao Qing Dao Village Power Wind/Diesel Hybrid Pilot Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2006-01-01

    In 2000, DOE/NREL and the State Power Corporation of China (SPCC) developed a pilot project to electrify Xiao Qing Dao, a small island located in China's Yellow Sea. The project demonstrates the practicality of renewable energy systems for medium-scale, off-grid applications. It consists of four 10 k-W wind turbines connected to a 30-kW diesel generator, a 40-kW inverter and a battery bank.

  2. Evaluation of Consideration and Incorporation of Green and Sustainable Remediation (GSR) Practices in Army Environmental Remediation. Volume 2. Pilot Project GSR Evaluation Reports

    DTIC Science & Technology

    2012-08-27

    Project Team. This option involves the use of on-site wind turbines to provide all of the approximately 73,800 MWh of the electricity estimated to...and improves the GSR parameter for percentage of energy from renewable resources. Footprint for constructing the wind turbines is not considered...the potential for wind turbines at the site, and an FS is currently being conducted. The National Guard may also be interested in sustainable

  3. DOE/NREL supported wind energy activities in Alaska

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Drouilhet, S.

    1997-12-01

    This paper describes three wind energy projects implemented in Alaska. The first, a sustainable technology energy partnerships (STEP) wind energy deployment project in Kotzebue will install 6 AOC 15/50 wind turbines and connect to the existing village diesel grid, consisting of approximately 1 MW average load. It seeks to develop solutions to the problems of arctic wind energy installations (transport, foundations, erection, operation, and maintenance), to establish a wind turbine test site, and to establish the Kotzebue Electric Association as a training and deployment center for wind/diesel technology in rural Alaska. The second project, a large village medium-penetration wind/diesel system,more » also in Kotzebue, will install a 1-2 MW windfarm, which will supplement the AOC turbines of the STEP project. The program will investigate the impact of medium penetration wind energy on power quality and system stability. The third project, the Alaska high-penetration wind/diesel village power pilot project in Wales will install a high penetration (80-100%) wind/diesel system in a remote Alaskan village. The system will include about 180 kW installed wind capacity, meeting an average village load of about 60 kW. This program will provide a model for high penetration wind retrofits to village diesel power systems and build the capability in Alaska to operate, maintain, and replicate wind/diesel technology. The program will also address problems of: effective use of excess wind energy; reliable diesel-off operation; and the role of energy storage.« less

  4. Knowledge Boosting Curriculum for New Wind Industry Professionals Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Marsh, Ruth H; Rogers, Anthony L

    DNV Renewables (USA) Inc. (DNV KEMA) received a grant from the U.S. Department of Energy (DOE) to develop the curriculum for a series of short courses intended to address Topic Area 5 Workforce Development, one of the focus areas to achieve the goals outlined in 20% Wind by 2030: Increasing Wind Energy's Contribution to Electricity Supply. The aim of the curriculum development project was to provide material for instructors to use in a training program to help professionals transition into careers in wind energy. Under this grant DNV KEMA established a knowledge boosting program for the wind energy industry withmore » the following objectives: 1. Develop technical training curricula and teaching materials for six key topic areas that can be implemented in a flexible format by a knowledgeable instructor. The topic areas form a foundation that can be leveraged for subsequent, more detailed learning modules (not developed in this program). 2. Develop an implementation guidance document to accompany the curricula outlining key learning objectives, implementation methods, and guidance for utilizing the curricula. This curriculum is intended to provide experienced trainers course material that can be used to provide course participants with a basic background in wind energy and wind project development. The curriculum addresses all aspects of developing a wind project, that when implemented can be put to use immediately, making the participant an asset to U.S. wind industry employers. The curriculum is comprised of six short modules, together equivalent in level of content to a one-semester college-level course. The student who completes all six modules should be able to understand on a basic level what is required to develop a wind project, speak with a reasonable level of confidence about such topics as wind resource assessment, energy assessment, turbine technology and project economics, and contribute to the analysis and review of project information. The content of the curriculum is based on DNV KEMA's extensive experience in consulting and falls under six general topics: 1. Introduction to wind energy 2. Wind resource and energy assessment 3. Wind turbine systems and components 4. Wind turbine installation, integration, and operation 5. Feasibility studies 6. Project economics Each general topic (module) covers 10-15 sub-topics. Representatives from industry provided input on the design and content of the modules as they were developed. DNV KEMA developed guidance documents to accompany the training curricula and materials in order to facilitate usage of the curricula in a manner consistent with industries requirements. Internal and external pilot trainings using selections of the curriculum provided valuable feedback that was then used to modify and improve the material and make it more relevant to participants. The pilot trainings varied in their content and intensity, and each served as an opportunity for the trainers to better understand which techniques proved to be the most successful for accelerated learning. In addition, the varied length and content of the trainings, which were adjusted to suit the focus and budget for each particular situation, highlight the flexibility of the format. The material developed under this program focused primarily on onshore wind project development. The course material could be extended in the future to address the unique aspects of offshore project development.« less

  5. WINDS (KIZUNA)-based Collaborative e-Learning Project in Thailand, Malaysia and Japan

    NASA Astrophysics Data System (ADS)

    Hisanaga, Makoto; Takahashi, Shin; Kameyama, Keisuke; Fukui, Yukio; Kitawaki, Nobuhiko

    The expanding digital divide deprives students in developing countries with opportunities for education. Advanced countries have the ability to enhance those opportunities. For this study, the authors set up and tested a remote lecture system using a commercial communication satellite beginning in 2002. This project attempted to solve issues in remote lecture systems using conventional satellite systems, and to build up a real-time collaborative lecture delivery system using a new satellite, called the Wideband InterNetworking engineering test and Demonstration Satellite (WINDS). This work proposes a remote education system using satellites, enabling the issues raised in the pilot experiments to be solved. Principal outcomes in this project include improvements of the quality of image and sound, and the communication delay. The authors also demonstrate the usefulness of WINDS in the education field.

  6. Building the U.S. First Offshore Wind Farm-Applying EBM Approaches to Successfully Address Offshore Energy, Commercial Fisheries, and Recreational Boating interactions

    NASA Astrophysics Data System (ADS)

    Lipsky, A.

    2016-12-01

    In August 2015 construction commenced on the Block Island Wind Farm, the first offshore wind energy project in the U.S. This pilot-scale offshore energy project, located 18 miles offshore of the Rhode Island mainland, was sited through a comprehensive ocean planning process. As the project progressed into design and construction, our team utilized potent ecosystem based management approaches to great advantage to address the human and resource interactions that existed in the project area. These practices have included designing and executing collaborative long-term monitoring ventures to fill key science gaps and reconcile fisheries concerns, establishing effective industry to industry engagement, and developing durable multi-sector agreements. This presentation will describe the specific EBM approaches used after the planning process was completed to bring the project to construction; highlighting where key aspects of the National Ocean Policy goals and principles have been successfully applied.

  7. Building the U.S. First Offshore Wind Farm-Applying EBM Approaches to Successfully Address Offshore Energy, Commercial Fisheries, and Recreational Boating interactions

    NASA Astrophysics Data System (ADS)

    Lipsky, A.

    2016-02-01

    In August 2015 construction commenced on the Block Island Wind Farm, the first offshore wind energy project in the U.S. This pilot-scale offshore energy project, located 18 miles offshore of the Rhode Island mainland, was sited through a comprehensive ocean planning process. As the project progressed into design and construction, our team utilized potent ecosystem based management approaches to great advantage to address the human and resource interactions that existed in the project area. These practices have included designing and executing collaborative long-term monitoring ventures to fill key science gaps and reconcile fisheries concerns, establishing effective industry to industry engagement, and developing durable multi-sector agreements. This presentation will describe the specific EBM approaches used after the planning process was completed to bring the project to construction; highlighting where key aspects of the National Ocean Policy goals and principles have been successfully applied.

  8. Chile rural electrification cooperation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Flowers, L.

    1997-12-01

    The author describes a joint program to use renewables for rural electrification projects in Chile. The initial focus was in a limited part of the country, involving wind mapping, pilot project planning, training, and development of methodologies for comparative evaluations of resources. To this point three wind hybrid systems have been installed in one region, as a part of the regional private utility, and three additional projects are being designed. Additional resource assessment and training is ongoing. The author points out the difficulties in working with utilities, the importance of signed documentation, and the need to look at these programsmore » as long term because of the time involved in introducing such new technologies.« less

  9. The Distributed Wind Cost Taxonomy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Forsyth, Trudy; Jimenez, Tony; Preus, Robert

    To date, there has been no standard method or tool to analyze the installed and operational costs for distributed wind turbine systems. This report describes the development of a classification system, or taxonomy, for distributed wind turbine project costs. The taxonomy establishes a framework to help collect, sort, and compare distributed wind cost data that mirrors how the industry categorizes information. The taxonomy organizes costs so they can be aggregated from installers, developers, vendors, and other sources without losing cost details. Developing a peer-reviewed taxonomy is valuable to industry stakeholders because a common understanding the details of distributed wind turbinemore » costs and balance of station costs is a first step to identifying potential high-value cost reduction opportunities. Addressing cost reduction potential can help increase distributed wind's competitiveness and propel the U.S. distributed wind industry forward. The taxonomy can also be used to perform cost comparisons between technologies and track trends for distributed wind industry costs in the future. As an initial application and piloting of the taxonomy, preliminary cost data were collected for projects of different sizes and from different regions across the contiguous United States. Following the methods described in this report, these data are placed into the established cost categories.« less

  10. US/Brazil joint pilot project objectives

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-12-01

    This paper describes a joint US/Brazil pilot project for rural electrification, whose major goals are: to establish technical, institutional, and economic confidence in using renewable energy (PV and wind) to meet the needs of the citizens of rural Brazil; to establish on-going institutional, individual and business relationships necessary to implement sustainable programs and commitments; to lay the groundwork for larger scale rural electrification through the use of distributed renewable technologies. The projects have supported low power home lighting systems, lighting and refrigeration for schools and medical centers, and water pumping systems. This is viewed as a long term project, wheremore » much of the equipment will come from the US, but Brazil will be responsible for program management, and sharing data gained from the program. The paper describes in detail the Brazilian program which was instituted to support this phased project.« less

  11. Neural Network Modeling of UH-60A Pilot Vibration

    NASA Technical Reports Server (NTRS)

    Kottapalli, Sesi

    2003-01-01

    Full-scale flight-test pilot floor vibration is modeled using neural networks and full-scale wind tunnel test data for low speed level flight conditions. Neural network connections between the wind tunnel test data and the tlxee flight test pilot vibration components (vertical, lateral, and longitudinal) are studied. Two full-scale UH-60A Black Hawk databases are used. The first database is the NASMArmy UH-60A Airloads Program flight test database. The second database is the UH-60A rotor-only wind tunnel database that was acquired in the NASA Ames SO- by 120- Foot Wind Tunnel with the Large Rotor Test Apparatus (LRTA). Using neural networks, the flight-test pilot vibration is modeled using the wind tunnel rotating system hub accelerations, and separately, using the hub loads. The results show that the wind tunnel rotating system hub accelerations and the operating parameters can represent the flight test pilot vibration. The six components of the wind tunnel N/rev balance-system hub loads and the operating parameters can also represent the flight test pilot vibration. The present neural network connections can significandy increase the value of wind tunnel testing.

  12. The Joint Airport Weather Studies Project - Current analysis highlights in the aviation safety context

    NASA Technical Reports Server (NTRS)

    Mccarthy, J.

    1984-01-01

    The principal objective of the Joint Airport Weather Studies Project was to obtain high-resolution velocity, turbulence, and thermodynamic data on a convective outflow called a microburst, an intense downdraft and resulting horizontal outflow near the surface. Data collection occurred during the summer of 1982 near Denver, CO. Data sensors included three pulsed-microwave Doppler and two pulsed CO2 lidar radars, along with 27 Portable Automated Mesonet surface weather stations, the FAA's low-level-wind-shear alert system (LLWSAS), and five instrumented research aircraft. Convective storms occurred on 75 of 91 operational days, with Doppler data being collected on at least 70 microbursts. Analyses reported included a thorough examination of microburst-climatology statistics, the capability of the LLWSAS to detect adequately and accurately the presence of low-altitude wind shear danger to aircraft, the capability of a terminal Doppler radar system development to provide improved wind-shear detection and warning, and progress toward improved wind-shear training for pilots.

  13. Sri Lanka Wind Farm Analysis and Site Selection Assistance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Young, M.; Vilhauer, R.

    2003-08-01

    The United States Department of Energy (DOE), through the National Renewable Energy Laboratory (NREL), has been working in partnership with the U.S. Agency for International Development (USAID) in an on-going process to quantify the Sri Lanka wind energy potential and foster wind energy development. Work to date includes completion of the NREL wind atlas for Sri Lanka. In addition, the Ceylon Electricity Board (CEB) has conducted a wind resource assessment of several areas of the country and has successfully completed and is currently operating a 3-MW pilot wind project. A review of the work completed to date indicates that additionalmore » activities are necessary to provide Sri Lanka with the tools necessary to identify the best wind energy development opportunities. In addition, there is a need to identify key policy, regulatory, business and infrastructure issues that affect wind energy development and to recommend steps to encourage and support wind power development and investment.« less

  14. Final Results from A Pilot Project to Investigate Wake Vortex Patterns and Weather Patterns at the Atlantic City Airport by the Richard Stockton College of NJ and the FAA

    NASA Astrophysics Data System (ADS)

    Trout, Joseph; Manson, J. Russell; King, David; Decicco, Nicolas; Prince, Alyssa; di Mercurio, Alexis; Rios, Manual

    2017-01-01

    Wake Vortex Turbulence is the turbulence generated by an aircraft in flight. This turbulence is created by vortices at the tips of the wing that may decay slowly and persist for several minutes after creation. These vortices and turbulence are hazardous to other aircraft in the vicinity. The strength, formation and lifetime of the turbulence and vortices are effected by many things including the weather. Here we present the final results of the pilot project to investigation of low level wind fields generated by the Weather Research and Forecasting Model and an analysis of historical data. The findings from the historical data and the data simulations were used as inputs for the computational fluid dynamics model (OpenFoam) to show that the vortices could be simulated using OpenFoam. Presented here are the updated results from a research grant, ``A Pilot Project to Investigate Wake Vortex Patterns and Weather Patterns at the Atlantic City Airport by the Stockton University and the FAA''.

  15. Complex terrain experiments in the New European Wind Atlas.

    PubMed

    Mann, J; Angelou, N; Arnqvist, J; Callies, D; Cantero, E; Arroyo, R Chávez; Courtney, M; Cuxart, J; Dellwik, E; Gottschall, J; Ivanell, S; Kühn, P; Lea, G; Matos, J C; Palma, J M L M; Pauscher, L; Peña, A; Rodrigo, J Sanz; Söderberg, S; Vasiljevic, N; Rodrigues, C Veiga

    2017-04-13

    The New European Wind Atlas project will create a freely accessible wind atlas covering Europe and Turkey, develop the model chain to create the atlas and perform a series of experiments on flow in many different kinds of complex terrain to validate the models. This paper describes the experiments of which some are nearly completed while others are in the planning stage. All experiments focus on the flow properties that are relevant for wind turbines, so the main focus is the mean flow and the turbulence at heights between 40 and 300 m. Also extreme winds, wind shear and veer, and diurnal and seasonal variations of the wind are of interest. Common to all the experiments is the use of Doppler lidar systems to supplement and in some cases replace completely meteorological towers. Many of the lidars will be equipped with scan heads that will allow for arbitrary scan patterns by several synchronized systems. Two pilot experiments, one in Portugal and one in Germany, show the value of using multiple synchronized, scanning lidar, both in terms of the accuracy of the measurements and the atmospheric physical processes that can be studied. The experimental data will be used for validation of atmospheric flow models and will by the end of the project be freely available.This article is part of the themed issue 'Wind energy in complex terrains'. © 2017 The Authors.

  16. Complex terrain experiments in the New European Wind Atlas

    PubMed Central

    Angelou, N.; Callies, D.; Cantero, E.; Arroyo, R. Chávez; Courtney, M.; Cuxart, J.; Dellwik, E.; Gottschall, J.; Ivanell, S.; Kühn, P.; Lea, G.; Matos, J. C.; Palma, J. M. L. M.; Peña, A.; Rodrigo, J. Sanz; Söderberg, S.; Vasiljevic, N.; Rodrigues, C. Veiga

    2017-01-01

    The New European Wind Atlas project will create a freely accessible wind atlas covering Europe and Turkey, develop the model chain to create the atlas and perform a series of experiments on flow in many different kinds of complex terrain to validate the models. This paper describes the experiments of which some are nearly completed while others are in the planning stage. All experiments focus on the flow properties that are relevant for wind turbines, so the main focus is the mean flow and the turbulence at heights between 40 and 300 m. Also extreme winds, wind shear and veer, and diurnal and seasonal variations of the wind are of interest. Common to all the experiments is the use of Doppler lidar systems to supplement and in some cases replace completely meteorological towers. Many of the lidars will be equipped with scan heads that will allow for arbitrary scan patterns by several synchronized systems. Two pilot experiments, one in Portugal and one in Germany, show the value of using multiple synchronized, scanning lidar, both in terms of the accuracy of the measurements and the atmospheric physical processes that can be studied. The experimental data will be used for validation of atmospheric flow models and will by the end of the project be freely available. This article is part of the themed issue ‘Wind energy in complex terrains’. PMID:28265025

  17. Demonstrate Energy Component of the Installation Master Plan Using Net Zero Installation Virtual Testbed

    DTIC Science & Technology

    2015-09-01

    capabilities. Chapter 4 includes examples of their application and results. The tool has also been applied to EMP processes at Fort Leonard Wood , MO...such as solar photovoltaics, solar-thermal, wind energy, biomass ( wood chips, etc.), biogas, or synthetic gas need to be considered as part of the mix...this project Besides its use on pilot projects funded by ESTCP program, NZP is currently being used at Fort Leonard Wood , MO and several other

  18. Demonstration of the Energy Component of the Installation Master Plan Using the Net Zero Energy Planner Tool

    DTIC Science & Technology

    2015-09-01

    capabilities. Chapter 4 includes examples of their application and results. The tool has also been applied to EMP processes at Fort Leonard Wood , MO...such as solar photovoltaics, solar-thermal, wind energy, biomass ( wood chips, etc.), biogas, or synthetic gas need to be considered as part of the mix...this project Besides its use on pilot projects funded by ESTCP program, NZP is currently being used at Fort Leonard Wood , MO and several other

  19. Pilot Jerrie Cobb Trains in the Multi-Axis Space Test Inertia Facility

    NASA Image and Video Library

    1960-04-21

    Jerrie Cobb prepares to operate the Multi-Axis Space Test Inertia Facility (MASTIF) inside the Altitude Wind Tunnel at the National Aeronautics and Space Administration (NASA) Lewis Research Center. The MASTIF was a three-axis rig with a pilot’s chair mounted in the center to train Project Mercury pilots to bring a spinning spacecraft under control. An astronaut was secured in a foam couch in the center of the rig. The rig was then spun on three axes from 2 to 50 rotations per minute. The pilots were tested on each of the three axis individually, then all three simultaneously. The two controllers in Cobb’s hands activated the small nitrogen gas thrusters that were used to bring the MASTIF under control. A makeshift spacecraft control panel was set up in front of the trainee’s face. Cobb was one of several female pilots who underwent the skill and endurance testing that paralleled that of the Project Mercury astronauts. In 1961 Jerrie Cobb was the first female to pass all three phases of the Mercury Astronaut Program. NASA rules, however, stipulated that only military test pilots could become astronauts and there were no female military test pilots. The seven Mercury astronauts had taken their turns on the MASTIF in February and March 1960.

  20. State of New Mexico wind site survey loan program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reynolds, R.D.

    1981-12-01

    This pilot project made available to the citizens of New Mexico, interested in wind energy, the loan of a wind data accumulator for one year so that they could determine if their site was suitable for the installation of a wind generator prior to their investment in a wind system. A nominal fee of $35.00 was charged for a year to help defray maintenance expenses. The Physical Science Laboratory meteorologist installed a 3-cup anemometer usually on a 30' telescoping mast at each site after looking over the exposure and making recommendations to the Site Owner. The electronic odometer was eithermore » housed inside a house or mounted to the mast in its lockable case. There are a total of 21 sets for loan. The site owners read their data once per week and mailed a data card in to the Physical Science Laboratory. The annual wind climatology for each site was computed and the owners advised of the suitability of their site for wind generation of electricity. An updated wind climatology for New Mexico was prepared utilizing this new data.« less

  1. Vertical wind velocity measurements using a five-hole probe with remotely piloted aircraft to study aerosol-cloud interactions

    NASA Astrophysics Data System (ADS)

    Calmer, Radiance; Roberts, Gregory C.; Preissler, Jana; Sanchez, Kevin J.; Derrien, Solène; O'Dowd, Colin

    2018-05-01

    The importance of vertical wind velocities (in particular positive vertical wind velocities or updrafts) in atmospheric science has motivated the need to deploy multi-hole probes developed for manned aircraft in small remotely piloted aircraft (RPA). In atmospheric research, lightweight RPAs ( < 2.5 kg) are now able to accurately measure atmospheric wind vectors, even in a cloud, which provides essential observing tools for understanding aerosol-cloud interactions. The European project BACCHUS (impact of Biogenic versus Anthropogenic emissions on Clouds and Climate: towards a Holistic UnderStanding) focuses on these specific interactions. In particular, vertical wind velocity at cloud base is a key parameter for studying aerosol-cloud interactions. To measure the three components of wind, a RPA is equipped with a five-hole probe, pressure sensors, and an inertial navigation system (INS). The five-hole probe is calibrated on a multi-axis platform, and the probe-INS system is validated in a wind tunnel. Once mounted on a RPA, power spectral density (PSD) functions and turbulent kinetic energy (TKE) derived from the five-hole probe are compared with sonic anemometers on a meteorological mast. During a BACCHUS field campaign at Mace Head Atmospheric Research Station (Ireland), a fleet of RPAs was deployed to profile the atmosphere and complement ground-based and satellite observations of physical and chemical properties of aerosols, clouds, and meteorological state parameters. The five-hole probe was flown on straight-and-level legs to measure vertical wind velocities within clouds. The vertical velocity measurements from the RPA are validated with vertical velocities derived from a ground-based cloud radar by showing that both measurements yield model-simulated cloud droplet number concentrations within 10 %. The updraft velocity distributions illustrate distinct relationships between vertical cloud fields in different meteorological conditions.

  2. Wind-To-Hydrogen Energy Pilot Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ron Rebenitsch; Randall Bush; Allen Boushee

    2009-04-24

    WIND-TO-HYDROGEN ENERGY PILOT PROJECT: BASIN ELECTRIC POWER COOPERATIVE In an effort to address the hurdles of wind-generated electricity (specifically wind's intermittency and transmission capacity limitations) and support development of electrolysis technology, Basin Electric Power Cooperative (BEPC) conducted a research project involving a wind-to-hydrogen system. Through this effort, BEPC, with the support of the Energy & Environmental Research Center at the University of North Dakota, evaluated the feasibility of dynamically scheduling wind energy to power an electrolysis-based hydrogen production system. The goal of this project was to research the application of hydrogen production from wind energy, allowing for continued wind energymore » development in remote wind-rich areas and mitigating the necessity for electrical transmission expansion. Prior to expending significant funding on equipment and site development, a feasibility study was performed. The primary objective of the feasibility study was to provide BEPC and The U.S. Department of Energy (DOE) with sufficient information to make a determination whether or not to proceed with Phase II of the project, which was equipment procurement, installation, and operation. Four modes of operation were considered in the feasibility report to evaluate technical and economic merits. Mode 1 - scaled wind, Mode 2 - scaled wind with off-peak, Mode 3 - full wind, and Mode 4 - full wind with off-peak In summary, the feasibility report, completed on August 11, 2005, found that the proposed hydrogen production system would produce between 8000 and 20,000 kg of hydrogen annually depending on the mode of operation. This estimate was based on actual wind energy production from one of the North Dakota (ND) wind farms of which BEPC is the electrical off-taker. The cost of the hydrogen produced ranged from $20 to $10 per kg (depending on the mode of operation). The economic sensitivity analysis performed as part of the feasibility study showed that several factors can greatly affect, both positively and negatively, the "per kg" cost of hydrogen. After a September 15, 2005, meeting to evaluate the advisability of funding Phase II of the project DOE concurred with BEPC that Phase I results did warrant a "go" recommendation to proceed with Phase II activities. The hydrogen production system was built by Hydrogenics and consisted of several main components: hydrogen production system, gas control panel, hydrogen storage assembly and hydrogen-fueling dispenser The hydrogen production system utilizes a bipolar alkaline electrolyzer nominally capable of producing 30 Nm3/h (2.7 kg/h). The hydrogen is compressed to 6000 psi and delivered to an on-site three-bank cascading storage assembly with 80 kg of storage capacity. Vehicle fueling is made possible through a Hydrogenics-provided gas control panel and dispenser able to fuel vehicles to 5000 psi. A key component of this project was the development of a dynamic scheduling system to control the wind energy's variable output to the electrolyzer cell stacks. The dynamic scheduling system received an output signal from the wind farm, processed this signal based on the operational mode, and dispatched the appropriate signal to the electrolyzer cell stacks. For the study BEPC chose to utilize output from the Wilton wind farm located in central ND. Site design was performed from May 2006 through August 2006. Site construction activities were from August to November 2006 which involved earthwork, infrastructure installation, and concrete slab construction. From April - October 2007, the system components were installed and connected. Beginning in November 2007, the system was operated in a start-up/shakedown mode. Because of numerous issues, the start-up/shakedown period essentially lasted until the end of January 2008, at which time a site acceptance test was performed. Official system operation began on February 14, 2008, and continued through the end of December 2008. Several issues continued to prevent consistent operation, resulting in operation of the system in fits and starts. During the operational period, three ramp tests were performed on the electrolyzer cell stacks to evaluate cell stack degradation, if present. In addition, from December 23 - 30 2008, the hydrogen system was operated using Mode 1 protocol. From February 14, 2008 - December 31, 2008, the system produced a total of just less than 26,000,000 liters (2320 kg), including approximately 3,300,000 liters (295 kg) of hydrogen during Mode 1 operation. Unfortunately, the chronic shutdown issues prevented consistent operation and, therefore, did not allow for any accurate economic analysis as originally intended. With that said, much valuable experience was gained in the form of "lessons learned," and the project served as an extremely valuable platform for educating the public.« less

  3. 2014 U.S. Offshore Wind Market Report: Industry Trends, Technology Advancement, and Cost Reduction

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, Aaron; Stehly, Tyler; Walter Musial

    2015 has been an exciting year for the U.S. offshore wind market. After more than 15 years of development work, the U.S. has finally hit a crucial milestone; Deepwater Wind began construction on the 30 MW Block Island Wind Farm (BIWF) in April. A number of other promising projects, however, have run into economic, legal, and political headwinds, generating much speculation about the future of the industry. This slow, and somewhat painful, start to the industry is not without precedent; each country in northern Europe began with pilot-scale, proof-of-concept projects before eventually moving to larger commercial scale installations. Now, aftermore » more than a decade of commercial experience, the European industry is set to achieve a new deployment record, with more than 4 GW expected to be commissioned in 2015, with demonstrable progress towards industry-wide cost reduction goals. DWW is leveraging 25 years of European deployment experience; the BIWF combines state-of-the-art technologies such as the Alstom 6 MW turbine with U.S. fabrication and installation competencies. The successful deployment of the BIWF will provide a concrete showcase that will illustrate the potential of offshore wind to contribute to state, regional, and federal goals for clean, reliable power and lasting economic development. It is expected that this initial project will launch the U.S. industry into a phase of commercial development that will position offshore wind to contribute significantly to the electric systems in coastal states by 2030.« less

  4. Numerical and flight simulator test of the flight deterioration concept

    NASA Technical Reports Server (NTRS)

    Mccarthy, J.; Norviel, V.

    1982-01-01

    Manned flight simulator response to theoretical wind shear profiles was studied in an effort to calibrate fixed-stick and pilot-in-the-loop numerical models of jet transport aircraft on approach to landing. Results of the study indicate that both fixed-stick and pilot-in-the-loop models overpredict the deleterious effects of aircraft approaches when compared to pilot performance in the manned simulator. Although the pilot-in-the-loop model does a better job than does the fixed-stick model, the study suggests that the pilot-in-the-loop model is suitable for use in meteorological predictions of adverse low-level wind shear along approach and departure courses to identify situations in which pilots may find difficulty. The model should not be used to predict the success or failure of a specific aircraft. It is suggested that the pilot model be used as part of a ground-based Doppler radar low-level wind shear detection and warning system.

  5. USDOE/Russian Ministry of Fuel and Energy joint collaboration for renewable energy resources

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Touryan, K.

    1997-12-01

    This paper describes a joint collaboration between the US and Russia to develop renewable energy resources. There are five main goals of the project. First is to establish Intersolarcenter as a sister organization to NREL for joint R&D activities, and to provide training to the staff. Second is to install demonstration systems in parks and selected locations around Moscow. Third is to install pilot projects: a wind/diesel hybrid system at 21 sites in the northern territories; a 500 kW biomass power plant in the Arkhangelsk Region. Fourth is to assist in the start-up operations of a 2 MW/yr Triple Junctionmore » amorphous-Si manufacturing facility in Moscow using US technology. Fifth is to explore the possibilities of financing large-scale wind/hybrid and biomass power systems for the nouthern territories (possibly 900 sites).« less

  6. Feasibility study of a procedure to detect and warn of low level wind shear

    NASA Technical Reports Server (NTRS)

    Turkel, B. S.; Kessel, P. A.; Frost, W.

    1981-01-01

    A Doppler radar system which provides an aircraft with advanced warning of longitudinal wind shear is described. This system uses a Doppler radar beamed along the glide slope linked with an on line microprocessor containing a two dimensional, three degree of freedom model of the motion of an aircraft including pilot/autopilot control. The Doppler measured longitudinal glide slope winds are entered into the aircraft motion model, and a simulated controlled aircraft trajectory is calculated. Several flight path deterioration parameters are calculated from the computed aircraft trajectory information. The aircraft trajectory program, pilot control models, and the flight path deterioration parameters are discussed. The performance of the computer model and a test pilot in a flight simulator through longitudinal and vertical wind fields characteristic of a thunderstorm wind field are compared.

  7. Puget Sound Tidal Energy In-Water Testing and Development Project Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Collar, Craig W

    2012-11-16

    Tidal energy represents potential for the generation of renewable, emission free, environmentally benign, and cost effective energy from tidal flows. A successful tidal energy demonstration project in Puget Sound, Washington may enable significant commercial development resulting in important benefits for the northwest region and the nation. This project promoted the United States Department of Energy's Wind and Hydropower Technologies Program's goals of advancing the commercial viability, cost-competitiveness, and market acceptance of marine hydrokinetic systems. The objective of the Puget Sound Tidal Energy Demonstration Project is to conduct in-water testing and evaluation of tidal energy technology as a first step towardmore » potential construction of a commercial-scale tidal energy power plant. The specific goal of the project phase covered by this award was to conduct all activities necessary to complete engineering design and obtain construction approvals for a pilot demonstration plant in the Admiralty Inlet region of the Puget Sound. Public Utility District No. 1 of Snohomish County (The District) accomplished the objectives of this award through four tasks: Detailed Admiralty Inlet Site Studies, Plant Design and Construction Planning, Environmental and Regulatory Activities, and Management and Reporting. Pre-Installation studies completed under this award provided invaluable data used for site selection, environmental evaluation and permitting, plant design, and construction planning. However, these data gathering efforts are not only important to the Admiralty Inlet pilot project. Lessons learned, in particular environmental data gathering methods, can be applied to future tidal energy projects in the United States and other parts of the world. The District collaborated extensively with project stakeholders to complete the tasks for this award. This included Federal, State, and local government agencies, tribal governments, environmental groups, and others. All required permit and license applications were completed and submitted under this award, including a Final License Application for a pilot hydrokinetic license from the Federal Energy Regulatory Commission. The tasks described above have brought the project through all necessary requirements to construct a tidal pilot project in Admiralty Inlet with the exception of final permit and license approvals, and the selection of a general contractor to perform project construction.« less

  8. Simulation comparison of a decoupled longitudinal control system and a velocity vector control wheel steering system during landings in wind shear

    NASA Technical Reports Server (NTRS)

    Kimball, G., Jr.

    1980-01-01

    A simulator comparison of the velocity vector control wheel steering (VCWS) system and a decoupled longitudinal control system is presented. The piloting task was to use the electronic attitude direction indicator (EADI) to capture and maintain a 3 degree glide slope in the presence of wind shear and to complete the landing using the perspective runway included on the EADI. The decoupled control system used constant prefilter and feedback gains to provide steady state decoupling of flight path angle, pitch angle, and forward velocity. The decoupled control system improved the pilots' ability to control airspeed and flight path angle during the final stages of an approach made in severe wind shear. The system also improved their ability to complete safe landings. The pilots preferred the decoupled control system in severe winds and, on a pilot rating scale, rated the approach and landing task with the decoupled control system as much as 3 to 4 increments better than use of the VCWS system.

  9. Piloted-simulation evaluation of escape guidance for microburst wind shear encounters. M.S. Thesis - George Washington Univ.

    NASA Technical Reports Server (NTRS)

    Hinton, David A.

    1989-01-01

    Numerous air carrier accidents and incidents result from encounters with the atmospheric wind shear associated with microburst phenomena, in some cases resulting in heavy loss of life. An important issue in current wind shear research is how to best manage aircraft performance during an inadvertent wind shear encounter. The goals of this study were to: (1) develop techniques and guidance for maximizing an aircraft's ability to recover from microburst encounters following takeoff, (2) develop an understanding of how theoretical predictions of wind shear recovery performance might be achieved in actual use, and (3) gain insight into the piloting factors associated with recovery from microburst encounters. Three recovery strategies were implemented and tested in piloted simulation. Results show that a recovery strategy based on flying a flight path angle schedule produces improved performance over constant pitch attitude or acceleration-based recovery techniques. The best recovery technique was initially counterintuitive to the pilots who participated in the study. Evidence was found to indicate that the techniques required for flight through the turbulent vortex of a microburst may differ from the techniques being developed using classical, nonturbulent microburst models.

  10. Establishing an Operational Data System for Surface Currents Derived from Satellite Altimeters and Scatterometers; Pilot Study for the Tropical Pacific

    NASA Astrophysics Data System (ADS)

    Lagerloef, G. S.; Cheney, R.; Mitchum, G. T.

    2001-12-01

    We are initiating a pilot processing system and data center to provide operational ocean surface velocity fields from satellite altimeter and vector wind data. The team includes the above authors plus M. Bourassa (FSU), V.Kousky (NOAA/NCEP), J.Polovina (NOAA/NMFS/Hawaii CoastWatch), R.Legeckis (NOAA/NESDIS), G. Jacobs (NRL), F. Bonjean (ESR), E.Johnson (ESR) and J.Gunn (ESR). Methods to derive surface currents are the outcome of several years of NASA sponsored research and the pilot project will transition that capability to operational oceanographic applications. The regional focus will be the tropical Pacific. Data applications include large scale climate diagnostics and prediction, fisheries management and recruitment, monitoring debris drift, larvae drift, oil spills, fronts and eddies. Additional uses for search and rescue, naval and maritime operations will be investigated. The pilot study will produce velocity maps to be updated on a weekly basis initially, with a goal for eventual 2-day maximum delay from time of satellite measurement. Grid resolution will be 100 km for the basin scale, and finer resolution in the vicinity of the Pacific Islands. Various illustrations of the velocity maps and their applications will be presented. The project's goal is to leave in place an automated system running at NOAA/NESDIS, with an established user clientele and open Internet data access.

  11. Simulation investigation of the effect of the NASA Ames 80-by 120-foot wind tunnel exhaust flow on light aircraft operating in the Moffett field trafffic pattern

    NASA Technical Reports Server (NTRS)

    Streeter, Barry G.

    1986-01-01

    A preliminary study of the exhaust flow from the Ames Research Center 80 by 120 Foot Wind Tunnel indicated that the flow might pose a hazard to low-flying light aircraft operating in the Moffett Field traffic pattern. A more extensive evaluation of the potential hazard was undertaken using a fixed-base, piloted simulation of a light, twin-engine, general-aviation aircraft. The simulated aircraft was flown through a model of the wind tunnel exhaust by pilots of varying experience levels to develop a data base of aircraft and pilot reactions. It is shown that a light aircraft would be subjected to a severe disturbance which, depending upon entry condition and pilot reaction, could result in a low-altitude stall or cause damage to the aircraft tail structure.

  12. 14 CFR 139.323 - Traffic and wind direction indicators.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Traffic and wind direction indicators. 139... CERTIFICATION OF AIRPORTS Operations § 139.323 Traffic and wind direction indicators. In a manner authorized by...) A wind cone that visually provides surface wind direction information to pilots. For each runway...

  13. 14 CFR 139.323 - Traffic and wind direction indicators.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Traffic and wind direction indicators. 139... CERTIFICATION OF AIRPORTS Operations § 139.323 Traffic and wind direction indicators. In a manner authorized by...) A wind cone that visually provides surface wind direction information to pilots. For each runway...

  14. 14 CFR 139.323 - Traffic and wind direction indicators.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Traffic and wind direction indicators. 139... CERTIFICATION OF AIRPORTS Operations § 139.323 Traffic and wind direction indicators. In a manner authorized by...) A wind cone that visually provides surface wind direction information to pilots. For each runway...

  15. 14 CFR 139.323 - Traffic and wind direction indicators.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Traffic and wind direction indicators. 139... CERTIFICATION OF AIRPORTS Operations § 139.323 Traffic and wind direction indicators. In a manner authorized by...) A wind cone that visually provides surface wind direction information to pilots. For each runway...

  16. 14 CFR 139.323 - Traffic and wind direction indicators.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Traffic and wind direction indicators. 139... CERTIFICATION OF AIRPORTS Operations § 139.323 Traffic and wind direction indicators. In a manner authorized by...) A wind cone that visually provides surface wind direction information to pilots. For each runway...

  17. Interpretation of combined wind profiler and aircraft-measured tropospheric winds and clear air turbulence

    NASA Technical Reports Server (NTRS)

    Thomson, D. W.; Syrett, William J.; Fairall, C. W.

    1991-01-01

    In the first experiment, it was found that wind profilers are far better suited for the detailed examination of jet stream structure than are weather balloons. The combination of good vertical resolution with not previously obtained temporal resolution reveals structural details not seen before. Development of probability-derived shear values appears possible. A good correlation between pilot reports of turbulence and wind shear was found. In the second experiment, hourly measurements of wind speed and direction obtained using two wind profiling Doppler radars during two prolonged jet stream occurrences over western Pennsylvania were analyzed. In particular, the time-variant characteristics of derived shear profiles were examined. Profiler data dropouts were studied in an attempt to determine possible reasons for the apparently reduced performance of profiling radar operating beneath a jet stream. Richardson number and wind shear statistics were examined along with pilot reports of turbulence in the vicinity of the profiler.

  18. A Remotely Piloted Aircraft (RPA) as a Measurement Tool for Wind-Energy Research

    NASA Astrophysics Data System (ADS)

    Wildmann, Norman; Bange, Jens

    2014-05-01

    In wind energy meteorology, RPA have the clear advantage compared to manned aircraft that they allow to fly very close to the ground and even in between individual wind turbines in a wind farm. Compared to meteorological towers and lidar systems, the advantage is the flexibility of the system, which makes it possible to measure at the desired site on short notice and not only in main wind direction. At the Center of Applied Geoscience at the University of Tübingen, the research RPA MASC (Multi-purpose Airborne Sensor Carrier) was developed. RPA of type MASC have a wingspan of about 3 m and a maximum take-off weight of 7.5 kg, including payload. The standard meteorological payload includes instruments for temperature, humidity, barometric pressure and wind measurement. It is possible to resolve turbulence fluctuations of wind and temperature up to 20 Hz. The autopilot ROCS (Research Onboard Computer System), which is developed at the Institute of Flight Mechanics and Control, University of Stuttgart, makes it possible to automatically follow predefined waypoints at constant altitude and airspeed. At a cruising speed of 24 m/s and a battery life of approx. one hour, a range of 80 km is feasible. The project 'Lidar Complex', funded by the German Federal Ministry for the Environment, Nature Conservation and Nuclear Safety, is part of the research network 'WindForS', based in Southern Germany. The goal of the project is to establish lidar technology for wind energy plant site evaluation in complex terrain. Additional goals are the comparison of different measurement techniques and the validation of wind-field models in not IEC 61400 conform terrain. It is planned to design a turbulent wind-field generator, fed by real measurement data, which can be used to analyse WEC behaviour. Two test sites were defined for the 'Lidar Complex' project, one in IEC-conform terrain about 15 km from the Baltic Sea, the other in the Swabian Alb, only 2 km downstream of a 100 m steep escarpment. At both sites, flight measurements were performed in 2013 with the RPA MASC. The data that was collected allows to investigate the influence of thermal stability of the atmosphere at the test site and turbulence intensity around individual wind energy converters (WECs). Several measurement flights were done to investigate the wake structure downstream a running WEC. Preliminary results will be presented as well as an outlook for future research with the instrument.

  19. Wind farm turbulence impacts on general aviation airports in Kansas.

    DOT National Transportation Integrated Search

    2014-01-01

    Wind turbines and wind farms have become popular in the State of Kansas. Some general aviation pilots have expressed a concern about the : turbulence that the spinning blades are creating. If a wind farm is built near an airport, does this affect the...

  20. Wind farm turbulence impacts on general aviation airports in Kansas : [technical summary].

    DOT National Transportation Integrated Search

    2014-01-01

    Wind turbines and wind farms have become popular in the State of Kansas. Some general aviation : pilots have expressed a concern about the turbulence that the spinning blades are creating. If a : wind farm is built near an airport, does this affect t...

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Leboeuf, C.; Taylor, R.W.; Corbus, D.

    A cooperative renewable energy project is underway between the U.S. Department of Energy (through the National Renewable Energy Laboratory, NREL), and the Federal Republic of Brazil (through the Centro de Pesquisas de Energia Eletrica, CEPEL). The objectives of this joint US/Brazilian program are to establish technical, institutional, and economic confidence in using renewable energy systems to meet the needs of the people of rural Brazil, to build ongoing partnerships beneficial to both countries, and to demonstrate the potential for large-scale rural electrification through the use of renewable energy systems. Phase 1 of this program resulted in the deployment of moremore » than 700 photovoltaic (PV) electric lighting systems in the Brazilian states of Pernambuco and Ceara. Phase 2 of the program extends the pilot project into six additional Brazilian states and demonstrates a wider variety of stand-alone end uses, including the use of wind electric power generation for selected sites and applications. Additionally, Phase 2 also includes the development of two hybrid village power systems, including one comprising PV, wind, battery, and diesel power sources. This paper focuses on this hybrid system, which is located in the Amazon River delta.« less

  2. Cockpit display of hazardous weather information

    NASA Technical Reports Server (NTRS)

    Hansman, R. John, Jr.; Wanke, Craig

    1991-01-01

    Information transfer and display issues associated with the dissemination of hazardous weather warnings are studied in the context of wind shear alerts. Operational and developmental wind shear detection systems are briefly reviewed. The July 11, 1988 microburst events observed as part of the Denver Terminal Doppler Weather Radar (TDWR) operational evaluation are analyzed in terms of information transfer and the effectiveness of the microburst alerts. Information transfer, message content and display issues associated with microburst alerts generated from ground based sources (Doppler Radar, Low Level Wind Shear Alert System, and Pilot Reports) are evaluated by means fo pilot opinion surveys and part task simulator studies.

  3. A Flight Training Simulator for Instructing the Helicopter Autorotation Maneuver (Enhanced Version)

    NASA Technical Reports Server (NTRS)

    Rogers, Steven P.; Asbury, Charles N.

    2000-01-01

    Autorotation is a maneuver that permits a safe helicopter landing when the engine loses power. A catastrophe may occur if the pilot's control inputs are incorrect, insufficient, excessive, or poorly timed. Due to the danger involved, full-touchdown autorotations are very rarely practiced. Because in-flight autorotation training is risky, time-consuming, and expensive, the objective of the project was to develop the first helicopter flight simulator expressly designed to train students in this critical maneuver. A central feature of the project was the inclusion of an enhanced version of the Pilot-Rotorcraft Intelligent Symbology Management Simulator (PRISMS), a virtual-reality system developed by Anacapa Sciences and Thought Wave. A task analysis was performed to identify the procedural steps in the autorotation, to inventory the information needed to support student task performance, to identify typical errors, and to structure the simulator's practice environment. The system provides immediate knowledge of results, extensive practice of perceptual-motor skills, part-task training, and augmented cueing in a realistic cockpit environment. Additional work, described in this report, extended the capabilities of the simulator in three areas: 1. Incorporation of visual training aids to assist the student in learning the proper appearance of the visual scene when the maneuver is being properly performed; 2. Introduction of the requirement to land at a particular spot, as opposed to the wide, flat open field initially used, and development of appropriate metrics of success; and 3. Inclusion of wind speed and wind direction settings (and random variability settings) to add a more realistic challenge in "hitting the spot."

  4. The Multi-Axis Space Test Inertia Facility in the Altitude Wind Tunnel

    NASA Image and Video Library

    1959-12-21

    National Aeronautics and Space Administration (NASA) pilot Joe Algranti tests the Multi-Axis Space Test Inertia Facility (MASTIF) inside the Altitude Wind Tunnel while researcher Robert Miller looks on. The MASTIF was a three-axis rig with a pilot’s chair mounted in the center to train Project Mercury pilots to bring a spinning spacecraft under control. An astronaut was secured in a foam couch in the center of the rig. The rig then spun on three axes from 2 to 50 rotations per minute. Small nitrogen gas thrusters were used by the astronauts to bring the MASTIF under control. The device was originally designed in early 1959 without the chair and controllers. It was used by Lewis researchers to determine if the Lewis-designed autopilot system could rectify the capsule’s attitude following separation. If the control system failed to work properly, the heatshield would be out of place and the spacecraft would burn up during reentry. The system was flight tested during the September 1959 launch of the Lewis-assembled Big Joe capsule. The MASTIF was adapted in late 1959 for the astronaut training. NASA engineers added a pilot’s chair, a hand controller, and an instrument display to the MASTIF in order familiarize the astronauts with the sensations of an out-of-control spacecraft. NASA Lewis researcher James Useller and Algranti perfected and calibrated the MASTIF in the fall of 1959. In February and March 1960, the seven Project Mercury astronauts traveled to Cleveland to train on the MASTIF.

  5. An Examination of Aviation Accidents Associated with Turbulence, Wind Shear and Thunderstorm

    NASA Technical Reports Server (NTRS)

    Evans, Joni K.

    2013-01-01

    The focal point of the study reported here was the definition and examination of turbulence, wind shear and thunderstorm in relation to aviation accidents. NASA project management desired this information regarding distinct subgroups of atmospheric hazards, in order to better focus their research portfolio. A seven category expansion of Kaplan's turbulence categories was developed, which included wake turbulence, mountain wave turbulence, clear air turbulence, cloud turbulence, convective turbulence, thunderstorm without mention of turbulence, and low altitude wind shear, microburst or turbulence (with no mention of thunderstorms).More than 800 accidents from flights based in the United States during 1987-2008 were selected from a National Transportation Safety Board (NTSB) database. Accidents were selected for inclusion in this study if turbulence, thunderstorm, wind shear or microburst was considered either a cause or a factor in the accident report, and each accident was assigned to only one hazard category. This report summarizes the differences between the categories in terms of factors such as flight operations category, aircraft engine type, the accident's geographic location and time of year, degree of injury to aircraft occupants, aircraft damage, age and certification of the pilot and the phase of flight at the time of the accident.

  6. Wind shear training applications for 91/135

    NASA Technical Reports Server (NTRS)

    Arbon, ED

    1991-01-01

    The requirement for wind shear training of all pilots has been demonstrated too often by the accident statistics of past years. Documents were developed to train airline crews on specific aircraft and to teach recognition of the meteorological conditions that are conducive to wind shear and microburst formation. A Wind Shear Training Aid program is discussed.

  7. 33 CFR 385.12 - Pilot projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Pilot projects. 385.12 Section... Processes § 385.12 Pilot projects. (a) The Plan includes pilot projects to address uncertainties associated... management, and wastewater reuse. The purpose of the pilot projects is to develop information necessary to...

  8. 33 CFR 385.12 - Pilot projects.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Pilot projects. 385.12 Section... Processes § 385.12 Pilot projects. (a) The Plan includes pilot projects to address uncertainties associated... management, and wastewater reuse. The purpose of the pilot projects is to develop information necessary to...

  9. 33 CFR 385.12 - Pilot projects.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Pilot projects. 385.12 Section... Processes § 385.12 Pilot projects. (a) The Plan includes pilot projects to address uncertainties associated... management, and wastewater reuse. The purpose of the pilot projects is to develop information necessary to...

  10. 33 CFR 385.12 - Pilot projects.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Pilot projects. 385.12 Section... Processes § 385.12 Pilot projects. (a) The Plan includes pilot projects to address uncertainties associated... management, and wastewater reuse. The purpose of the pilot projects is to develop information necessary to...

  11. A simplified method for calculating temperature time histories in cryogenic wind tunnels

    NASA Technical Reports Server (NTRS)

    Stallings, R. L., Jr.; Lamb, M.

    1976-01-01

    Average temperature time history calculations of the test media and tunnel walls for cryogenic wind tunnels have been developed. Results are in general agreement with limited preliminary experimental measurements obtained in a 13.5-inch pilot cryogenic wind tunnel.

  12. Apollo 12 Mission image - Close-up view of the Solar Wind Panel

    NASA Image and Video Library

    1969-11-19

    AS12-47-6898 (19 Nov. 1969) --- A close-up view of the Solar Wind Composition device. Astronaut Alan L. Bean, lunar module pilot, took this photograph, after having deployed the device. Astronauts Charles Conrad Jr., commander, and Bean descended in the Apollo 12 Lunar Module (LM) to explore the moon, while astronaut Richard F. Gordon Jr., command module pilot, remained in lunar orbit with the Command and Service Modules (CSM).

  13. Meteodrones - Meteorological Planetary Boundary Layer Measurements by Vertical Drone Soundings

    NASA Astrophysics Data System (ADS)

    Lauer, Jonas; Fengler, Martin

    2017-04-01

    As of today, there is a gap in the operational data collection of meteorological observations in the Planetary Boundary Layer (PBL). This lack of spatially and temporally reliable knowledge of PBL conditions and energy fluxes with the surface causes shortcomings in the prediction of micro- and mesoscale phenomena such as convection, temperature inversions, local wind systems or fog. The currently used remote sensing instruments share the drawback of only partially covering necessary variables. To fill this data gap, since 2012, Meteomatics has been developing a drone measurement system, the Meteodrone, to measure the parameters wind speed, wind direction, dewpoint, temperature and air pressure of the PBL up to 1.5 km above ground. Both the data quality and the assimilation into a regional numerical weather model could be determined in several pilot studies. Besides, a project in cooperation with the NSSL (National Severe Storms Laboratory) was launched in October 2016 with the goal of capturing pre-convective conditions for improved severe storm forecasts in Oklahoma. Also, related measurements, such as air pollution measurements in the Misox valley to determine LDSP values, were successfully conducted. The main goal of the project is the operational data collection of PBL measurements and the assimilation of this data into regional numerical weather forecast models. Considering the high data quality indicated in all conducted studies as well as the trouble-free execution, this goal is both worthwhile and realistic.

  14. 33 CFR 385.12 - Pilot projects.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... management, and wastewater reuse. The purpose of the pilot projects is to develop information necessary to... Processes § 385.12 Pilot projects. (a) The Plan includes pilot projects to address uncertainties associated...-Federal sponsor shall develop a Project Management Plan as described in § 385.24. (c) Project...

  15. The lift-fan aircraft: Lessons learned

    NASA Technical Reports Server (NTRS)

    Deckert, Wallace H.

    1995-01-01

    This report summarizes the highlights and results of a workshop held at NASA Ames Research Center in October 1992. The objective of the workshop was a thorough review of the lessons learned from past research on lift fans, and lift-fan aircraft, models, designs, and components. The scope included conceptual design studies, wind tunnel investigations, propulsion systems components, piloted simulation, flight of aircraft such as the SV-5A and SV-5B and a recent lift-fan aircraft development project. The report includes a brief summary of five technical presentations that addressed the subject The Lift-Fan Aircraft: Lessons Learned.

  16. An expert system for wind shear avoidance

    NASA Technical Reports Server (NTRS)

    Stengel, Robert F.; Stratton, D. Alexander

    1990-01-01

    A study of intelligent guidance and control concepts for protecting against the adverse effects of wind shear during aircraft takeoffs and landings is being conducted, with current emphasis on developing an expert system for wind shear avoidance. Principal objectives are to develop methods for assessing the likelihood of wind shear encounter (based on real-time information in the cockpit), for deciding what flight path to pursue (e.g., takeoff abort, landing go-around, or normal climbout or glide slope), and for using the aircraft's full potential for combating wind shear. This study requires the definition of both deterministic and statistical techniques for fusing internal and external information , for making go/no-go decisions, and for generating commands to the manually controlled flight. The program has begun with the development of the WindShear Safety Advisor, an expert system for pilot aiding that is based on the FAA Windshear Training Aid; a two-volume manual that presents an overview , pilot guide, training program, and substantiating data provides guidelines for this initial development. The WindShear Safety Advisor expert system currently contains over 200 rules and is coded in the LISP programming language.

  17. WindFloat Pacific Project, Final Scientific and Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Banister, Kevin

    2017-01-17

    PPI’s WindFloat Pacific project (WFP) was an up to 30 MW floating offshore wind demonstration project proposed off the Coast of Oregon. The project was to be sited approximately 18 miles due west of Coos Bay, in over 1000 ft. of water, and is the first floating offshore wind array proposed in the United States, and the first offshore wind project of any kind proposed off the West Coast. PPI’s WindFloat, a semi-submersible foundation designed for high-capacity (6MW+) offshore wind turbines, is at the heart of the proposed project, and enables access to the world class wind resource at themore » project site and, equally, to other deep water, high wind resource areas around the country.« less

  18. Competency-Based Transfer Pilot Project--Final Report. Executive Summary [and] Competency-Based Transfer Pilot Project: Final Report on House Bill 1909

    ERIC Educational Resources Information Center

    Washington Higher Education Coordinating Board, 2006

    2006-01-01

    This publication contains the following: (1) Competency-Based Transfer Pilot Project--Final Report. Executive Summary (January 2006); and (2) Competency-Based Transfer Pilot Project: Final Report on House Bill 1909 (January 2005). In 2003, the legislature and governor enacted House Bill 1909 to create a pilot project on competency-based transfer…

  19. 76 FR 2903 - Interconnection of the Proposed Hyde County Wind Energy Center Project (DOE/EIS-0461), and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-18

    ... Wind Energy Center Project (DOE/EIS-0461), and Proposed Crowned Ridge Wind Energy Center Project (DOE... to prepare environmental impact statements (EISs) for the Hyde County Wind Energy Center Project and the Crowned Ridge Wind Energy Center Project in the Federal Register on November 30, 2010. Both...

  20. Wind for Schools: A Wind Powering America Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2007-12-01

    This brochure serves as an introduction to Wind Powering America's Wind for Schools Project, including a description of the project, the participants, funding sources, and the basic configurations of the project.

  1. Remotely Piloted Vehicles for Experimental Flight Control Testing

    NASA Technical Reports Server (NTRS)

    Motter, Mark A.; High, James W.

    2009-01-01

    A successful flight test and training campaign of the NASA Flying Controls Testbed was conducted at Naval Outlying Field, Webster Field, MD during 2008. Both the prop and jet-powered versions of the subscale, remotely piloted testbeds were used to test representative experimental flight controllers. These testbeds were developed by the Subsonic Fixed Wing Project s emphasis on new flight test techniques. The Subsonic Fixed Wing Project is under the Fundamental Aeronautics Program of NASA's Aeronautics Research Mission Directorate (ARMD). The purpose of these testbeds is to quickly and inexpensively evaluate advanced concepts and experimental flight controls, with applications to adaptive control, system identification, novel control effectors, correlation of subscale flight tests with wind tunnel results, and autonomous operations. Flight tests and operator training were conducted during four separate series of tests during April, May, June and August 2008. Experimental controllers were engaged and disengaged during fully autonomous flight in the designated test area. Flaps and landing gear were deployed by commands from the ground control station as unanticipated disturbances. The flight tests were performed NASA personnel with support from the Maritime Unmanned Development and Operations (MUDO) team of the Naval Air Warfare Center, Aircraft Division

  2. Determination of the effect of wind velocity and direction changes on turbidity removal in rectangular sedimentation tanks.

    PubMed

    Khezri, Seyed Mostafa; Biati, Aida; Erfani, Zeynab

    2012-01-01

    In the present study, a pilot-scale sedimentation tank was used to determine the effect of wind velocity and direction on the removal efficiency of particles. For this purpose, a 1:20 scale pilot simulated according to Frude law. First, the actual efficiency of total suspended solids (TSS) removal was calculated in no wind condition. Then, the wind was blown in the same and the opposite directions of water flow. At each direction TSS removal was calculated at three different velocities from 2.5 to 7 m/s. Results showed that when the wind was in the opposite direction of water flow, TSS removal efficiency initially increased with the increase of wind velocity from 0 to 2.5 m/s, then it decreased with the increase of velocity to 5 m/s. This mainly might happen because the opposite direction of wind can increase particles' retention time in the sedimentation tank. However, higher wind velocities (i.e. 3.5 and 5.5 m/s) could not increase TSS removal efficiency. Thus, if sedimentation tanks are appropriately exposed to the wind, TSS removal efficiency increases by approximately 6%. Therefore, energy consumption will be reduced by a proper site selection for sedimentation tank unit in water and waste water treatment plants.

  3. Assessing relationships between cattle egret migration and meteorology in the southwest Pacific: a review

    NASA Astrophysics Data System (ADS)

    Bridgman, H. A.; Maddock, M.; Geering, D. J.

    The evolution of research into meteorological factors affecting the migration of the Cattle Egret (Ardeola ibis coromandus) in the southwestern Pacific region (Australia, New Zealand and the Tasman Sea) - from ground-based studies dependent on volunteer observers to a pilot satellite-tracking project - is reviewed and the results are related to the literature on bird migration. The predominant pattern is a seasonal migration from breeding colonies in southeast Queensland and northern New South Wales which takes place in stages along the east coastal plain under favourable meteorological conditions. Migration outward (southward) occurs in February through April and return to the breeding colonies occurs in October and November. Wintering destinations include Tasmania, southern Victoria and parts of New Zealand. Favourable meteorological conditions for migration southward include:moderate north to northwest airflow behind a high; light and variable winds in a high or col; and light and variable winds over New South Wales with moderate westerlies over Victoria and Tasmania. A satellite-tracking project helped to validate findings from the ground-based studies, provided additional information not otherwise obtainable, and demonstrated the potential of the technique to further clarify the relation between timing and staging of migration, and meteorology.

  4. Jimmy Doolittle: Cincinnatus of the Air

    DTIC Science & Technology

    2016-07-01

    fatigue to be his biggest obstacle. Consequently, he planned his flight from east-to-west into prevailing winds because the westerly route offered him...remaining year at MIT to pursue doctoral studies. His dissertation, titled “The Effect of the Wind Velocity Gradient on Airplane Performance...investigated the effects of wind on flight characteristics. Many experienced pilots claimed it was easier to fly into the wind than away. Other

  5. Evaluation of iconic versus F-map microburst displays

    NASA Technical Reports Server (NTRS)

    Salzberger, Mark; Hansman, R. John; Wanke, Craig

    1994-01-01

    Previous studies have shown graphical presentation methods of hazardous wind shear to be superior to textual or audible warnings alone. Positional information and the strength of the hazard were observed to be and were cited by pilots as the most important factors in a display. In this experiment the use of the three different graphical presentations of hazardous wind shear are examined. Airborne predictive detectors of wind shear enable the dissemination of varying levels of information. The effectiveness of iconic and mapping display modes of different complexities are addressed through simulation and analysis. Different positional and time-varying situations are presented in a 'part-task' Boeing 767 simulator using data from actual microburst events. Experienced airline pilots fly approach profiles using both iconic and F-map wind shear alerting displays. Microburst accompanied each event is also shown to the pilot. Mapping display types are expected to be found exceptionally efficient at conveying location comparison information while iconic displays simplify the threat recognition process. Preliminary results from the simulator study are presented. Recommendations concerning the suitability of multilevel iconic and mapping displays are made. Situational problems with current display prototypes are also addressed.

  6. 7 CFR 210.28 - Pilot project exemptions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Pilot project exemptions. 210.28 Section 210.28... AGRICULTURE CHILD NUTRITION PROGRAMS NATIONAL SCHOOL LUNCH PROGRAM Additional Provisions § 210.28 Pilot project exemptions. Those State agencies or school food authorities selected for the pilot projects...

  7. 7 CFR 210.28 - Pilot project exemptions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Pilot project exemptions. 210.28 Section 210.28... AGRICULTURE CHILD NUTRITION PROGRAMS NATIONAL SCHOOL LUNCH PROGRAM Additional Provisions § 210.28 Pilot project exemptions. Those State agencies or school food authorities selected for the pilot projects...

  8. Pilot-scale concept of real-time wind speed-matching wind tunnel for measurements of gaseous emissions

    USDA-ARS?s Scientific Manuscript database

    Comprehensive control of odors, hydrogen sulfide (H2S), ammonia (NH3) and odorous volatile organic compound (VOC) emissions associated with animal production is a critical need. Current methods utilizing wind tunnels and flux chambers for measurements of gaseous emissions from area sources such as f...

  9. Wind Tunnel Tests Conducted to Develop an Icing Flight Simulator

    NASA Technical Reports Server (NTRS)

    Ratvasky, Thomas P.

    2001-01-01

    As part of NASA's Aviation Safety Program goals to reduce aviation accidents due to icing, NASA Glenn Research Center is leading a flight simulator development activity to improve pilot training for the adverse flying characteristics due to icing. Developing flight simulators that incorporate the aerodynamic effects of icing will provide a critical element in pilot training programs by giving pilots a pre-exposure of icing-related hazards, such as ice-contaminated roll upset or tailplane stall. Integrating these effects into training flight simulators will provide an accurate representation of scenarios to develop pilot skills in unusual attitudes and loss-of-control events that may result from airframe icing. In order to achieve a high level of fidelity in the flight simulation, a series of wind tunnel tests have been conducted on a 6.5-percent-scale Twin Otter aircraft model. These wind tunnel tests were conducted at the Wichita State University 7- by 10-ft wind tunnel and Bihrle Applied Research's Large Amplitude Multiple Purpose Facility in Neuburg, Germany. The Twin Otter model was tested without ice (baseline), and with two ice configurations: 1) Ice on the horizontal tail only; 2) Ice on the wing, horizontal tail, and vertical tail. These wind tunnel tests resulted in data bases of aerodynamic forces and moments as functions of angle of attack; sideslip; control surface deflections; forced oscillations in the pitch, roll, and yaw axes; and various rotational speeds. A limited amount of wing and tail surface pressure data were also measured for comparison with data taken at Wichita State and with flight data. The data bases from these tests will be the foundation for a PC-based Icing Flight Simulator to be delivered to Glenn in fiscal year 2001.

  10. Wind for Schools: A Wind Powering America Project

    ERIC Educational Resources Information Center

    US Department of Energy, 2007

    2007-01-01

    The U.S. Department of Energy's (DOE's) Wind Powering America program (based at the National Renewable Energy Laboratory) sponsors the Wind for Schools Project to raise awareness in rural America about the benefits of wind energy while simultaneously educating college seniors regarding wind energy applications. The three primary project goals of…

  11. Static Wind-Tunnel and Radio-Controlled Flight Test Investigation of a Remotely Piloted Vehicle Having a Delta Wing Planform

    NASA Technical Reports Server (NTRS)

    Yip, Long P.; Fratello, David J.; Robelen, David B.; Makowiec, George M.

    1990-01-01

    At the request of the United States Marine Corps, an exploratory wind-tunnel and flight test investigation was conducted by the Flight Dynamics Branch at the NASA Langley Research Center to improve the stability, controllability, and general flight characteristics of the Marine Corps Exdrone RPV (Remotely Piloted Vehicle) configuration. Static wind tunnel tests were conducted in the Langley 12 foot Low Speed Wind Tunnel to identify and improve the stability and control characteristics of the vehicle. The wind tunnel test resulted in several configuration modifications which included increased elevator size, increased vertical tail size and tail moment arm, increased rudder size and aileron size, the addition of vertical wing tip fins, and the addition of leading-edge droops on the outboard wing panel to improve stall departure resistance. Flight tests of the modified configuration were conducted at the NASA Plum Tree Test Site to provide a qualitative evaluation of the flight characteristics of the modified configuration.

  12. 7 CFR 1412.48 - Planting Transferability Pilot Project.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 10 2011-01-01 2011-01-01 false Planting Transferability Pilot Project. 1412.48... and Peanuts 2008 through 2012 § 1412.48 Planting Transferability Pilot Project. (a) Notwithstanding § 1412.47, for each of the 2009 and subsequent crop years, the Planting Transferability Pilot Project...

  13. AD-1 with research pilot Richard E. Gray

    NASA Technical Reports Server (NTRS)

    1982-01-01

    Standing in front of the AD-1 Oblique Wing research aircraft is research pilot Richard E. Gray. Richard E. Gray joined National Aeronautics and Space Administration's Johnson Space Center, Houston, Texas, in November 1978, as an aerospace research pilot. In November 1981, Dick joined the NASA's Ames-Dryden Flight Research Facility, Edwards, California, as a research pilot. Dick was a former Co-op at the NASA Flight Research Center (a previous name of the Ames-Dryden Flight Research Facility), serving as an Operations Engineer. At Ames-Dryden, Dick was a pilot for the F-14 Aileron Rudder Interconnect Program, AD-1 Oblique Wing Research Aircraft, F-8 Digital Fly-By-Wire and Pilot Induced Oscillations investigations. He also flew the F-104, T-37, and the F-15. On November 8, 1982, Gray was fatally injured in a T-37 jet aircraft while making a pilot proficiency flight. Dick graduated with a Bachelors degree in Aeronautical Engineering from San Jose State University in 1969. He joined the U.S. Navy in July 1969, becoming a Naval Aviator in January 1971, when he was assigned to F-4 Phantoms at Naval Air Station (NAS) Miramar, California. In 1972, he flew 48 combat missions in Vietnam in F-4s with VF-111 aboard the USS Coral Sea. After making a second cruise in 1973, Dick was assigned to Air Test and Evaluation Squadron Four (VX-4) at NAS Point Mugu, California, as a project pilot on various operational test and evaluation programs. In November 1978, Dick retired from the Navy and joined NASA's Johnson Space Center. At JSC Gray served as chief project pilot on the WB-57F high-altitude research projects and as the prime television chase pilot in a T-38 for the landing portion of the Space Shuttle orbital flight tests. Dick had over 3,000 hours in more than 30 types of aircraft, an airline transport rating, and 252 carrier arrested landings. He was a member of the Society of Experimental Test Pilots serving on the Board of Directors as Southwest Section Technical Adviser in 1981/1982. Richard E. Gray was born March 11, 1945 in Newport News, Virginia; he died on November 8, 1982 at Edwards, California, in a T-37 spin accident. The Ames-Dryden-1 (AD-1) aircraft was designed to investigate the concept of an oblique (pivoting) wing. The wing could be rotated on its center pivot, so that it could be set at its most efficient angle for the speed at which the aircraft was flying. NASA Ames Research Center Aeronautical Engineer Robert T. Jones conceived the idea of an oblique wing. His wind tunnel studies at Ames (Moffett Field, CA) indicated that an oblique wing design on a supersonic transport might achieve twice the fuel economy of an aircraft with conventional wings. The oblique wing on the AD-1 pivoted about the fuselage, remaining perpendicular to it during slow flight and rotating to angles of up to 60 degrees as aircraft speed increased. Analytical and wind tunnel studiesthat Jones conducted at Ames indicated that a transport-sized oblique-wing aircraft flying at speeds of up to Mach 1.4 (1.4 times the speed of sound) would have substantially better aerodynamic performance than aircraft with conventional wings. The AD-1 structure allowed the project to complete all of its technical objectives. The type of low-speed, low-cost vehicle - as expected - exhibited aeroelastic and pitch-roll-coupling effects that contributed to poor handling at sweep angles above 45 degrees. The fiberglass structure limited the wing stiffness that would have improved the handling qualities. Thus, after completion of the AD-1 project, there was still a need for a transonic oblique-wing research aircraft to assess the effects of compressibility, evaluate a more representative structure, and analyze flight performance at transonic speeds (those on either side of the speed of sound). The aircraft was delivered to the Dryden Flight Research Center, Edwards, CA, in March 1979 and its first flight was on December 21, 1979. Piloting the aircraft on that flight, as well as on its last flight on August 7, 1982, was NASA Research Pilot Thomas C. McMurtry. The AD-1 flew a total of 79 times during the research program. The aircraft was constructed by the Ames Industrial Co., Bohemia, NY, under a $240, 000 fixed-price contract. NASA specified the design based on a geometric configuration provided by the Boeing company. The Rutan Aircraft Factory, Mojave, CA, provided the detailed design and loads analysis for the vehicle. The aircraft was 38.8 feet long and 6.75 feet high with a wing span of 32.3 feet, unswept. It was constructed of plastic reinforced with fiberglass and weighed 1,450 pounds,empty. The vehicle was powered by two small turbojet engines, each producing 220 pounds of thrust at sea level. Due to safety concerns, the aircraft was limited to speeds of 170 mph.

  14. 7 CFR 1955.132 - Pilot projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 14 2011-01-01 2011-01-01 false Pilot projects. 1955.132 Section 1955.132 Agriculture... REGULATIONS (CONTINUED) PROPERTY MANAGEMENT Disposal of Inventory Property General § 1955.132 Pilot projects. FmHA or its successor agency under Public Law 103-354 may conduct pilot projects to test policies and...

  15. 7 CFR 1955.132 - Pilot projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 14 2010-01-01 2009-01-01 true Pilot projects. 1955.132 Section 1955.132 Agriculture... REGULATIONS (CONTINUED) PROPERTY MANAGEMENT Disposal of Inventory Property General § 1955.132 Pilot projects. FmHA or its successor agency under Public Law 103-354 may conduct pilot projects to test policies and...

  16. 7 CFR 1955.132 - Pilot projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 14 2014-01-01 2014-01-01 false Pilot projects. 1955.132 Section 1955.132 Agriculture... REGULATIONS (CONTINUED) PROPERTY MANAGEMENT Disposal of Inventory Property General § 1955.132 Pilot projects. FmHA or its successor agency under Public Law 103-354 may conduct pilot projects to test policies and...

  17. 75 FR 81637 - Commercial Lease for the Cape Wind Energy Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-28

    ... Commercial Lease for the Cape Wind Energy Project AGENCY: Bureau of Ocean Energy Management, Regulation and... Renewable Energy Development on the Outer Continental Shelf (``OCS'') for the Cape Wind Energy Project... requirements of 30 CFR 285.231. The Lease is for the Cape Wind Energy Project (``Project'') which grants Cape...

  18. A candidate concept for display of forward-looking wind shear information

    NASA Technical Reports Server (NTRS)

    Hinton, David A.

    1989-01-01

    A concept is proposed which integrates forward-look wind shear information with airplane performance capabilities to predict future airplane energy state as a function of range. The information could be displayed to a crew either in terms of energy height or airspeed deviations. The anticipated benefits of the proposed display information concept are: (1) a wind shear hazard product that scales directly to the performance impact on the airplane and that has intuitive meaning to flight crews; (2) a reduction in flight crew workload by automatic processing of relevant hazard parameters; and (3) a continuous display of predicted airplane energy state if the approach is continued. Such a display may be used to improve pilot situational awareness or improve pilot confidence in wind shear alerts generated by other systems. The display is described and the algorithms necessary for implementation in a simulation system are provided.

  19. Intelligent guidance and control for wind shear encounter

    NASA Technical Reports Server (NTRS)

    Stengel, Robert F.

    1988-01-01

    The principal objective is to develop methods for assessing the likelihood of wind shear encounter, for deciding what flight path to pursue, and for using the aircraft's full potential for combating wind shear. This study requires the definition of both deterministic and statistical techniques for fusing internal and external information, for making go/no-go decisions, and for generating commands to the aircraft's cockpit displays and autopilot for both manually controlled and automatic flight. The program has begun with the development of a real-time expert system for pilot aiding that is based on the results of the FAA Windshear Training Aids Program. A two-volume manual that presents an overview, pilot guide, training program, and substantiating data provides guidelines for this initial development. The Expert System to Avoid Wind Shear (ESAWS) currently contains over 140 rules and is coded in the LISP programming language for implementation on a Symbolics 3670 LISP machine.

  20. 76 FR 2898 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-18

    ...-002. Applicants: Fenton Power Partners I, LLC, Wapsipinicon Wind Project, LLC, Shiloh Wind Project 2, LLC, Hoosier Wind Project, LLC, Oasis Power Partners, LLC, Chanarambie Power Partners, LLC, Lakefield Wind Project, LLC. Description: Notice of Non-Material Change in Status of Chanarambie Power, et al...

  1. Field computation of winds-aloft velocities from single theodolite pilot balloon observations

    Treesearch

    Bill C. Ryan

    1976-01-01

    The ability to determine wind speeds and directions in the first few thousand meters of the atmosphere is important in many forestry operations such as smolce management, aircraft seeding and spraying, prescribed burning, and wildfire suppression. A hand-held electronic calculator can be used to compute winds aloft as balloon observations are taken. Calculations can...

  2. Wind Fins: Novel Lower-Cost Wind Power System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David C. Morris; Dr. Will D. Swearingen

    This project evaluated the technical feasibility of converting energy from the wind with a novel “wind fin” approach. This patent-pending technology has three major components: (1) a mast, (2) a vertical, hinged wind structure or fin, and (3) a power takeoff system. The wing structure responds to the wind with an oscillating motion, generating power. The overall project goal was to determine the basic technical feasibility of the wind fin technology. Specific objectives were the following: (1) to determine the wind energy-conversion performance of the wind fin and the degree to which its performance could be enhanced through basic designmore » improvements; (2) to determine how best to design the wind fin system to survive extreme winds; (3) to determine the cost-effectiveness of the best wind fin designs compared to state-of-the-art wind turbines; and (4) to develop conclusions about the overall technical feasibility of the wind fin system. Project work involved extensive computer modeling, wind-tunnel testing with small models, and testing of bench-scale models in a wind tunnel and outdoors in the wind. This project determined that the wind fin approach is technically feasible and likely to be commercially viable. Project results suggest that this new technology has the potential to harvest wind energy at approximately half the system cost of wind turbines in the 10kW range. Overall, the project demonstrated that the wind fin technology has the potential to increase the economic viability of small wind-power generation. In addition, it has the potential to eliminate lethality to birds and bats, overcome public objections to the aesthetics of wind-power machines, and significantly expand wind-power’s contribution to the national energy supply.« less

  3. 40 CFR 403.20 - Pretreatment Program Reinvention Pilot Projects Under Project XL.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 30 2013-07-01 2012-07-01 true Pretreatment Program Reinvention Pilot Projects Under Project XL. 403.20 Section 403.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... OF POLLUTION § 403.20 Pretreatment Program Reinvention Pilot Projects Under Project XL. The Approval...

  4. Wind for Schools: A Wind Powering America Project (Alaska) (Brochure)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2010-02-01

    This brochure provides an overview of Wind Powering America's Wind for Schools Project, including a description of the project, the participants, funding sources, the basic configurations, and how interested parties can become involved.

  5. Wind for Schools: A Wind Powering America Project (Brochure)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baring-Gould, I.

    2009-08-01

    This brochure provides an overview of Wind Powering America's Wind for Schools Project, including a description of the project, the participants, funding sources, the basic configurations, and how interested parties can become involved.

  6. The Effect of Pitch, Roll, and Yaw on Airborne Gravity Observations of the NOAA GRAV-D Project

    NASA Astrophysics Data System (ADS)

    Childers, V. A.; Kanney, J.; Youngman, M.

    2017-12-01

    Aircraft turbulence can wreak havoc on the gravity measurementby beam-style gravimeters. Prior studies have confirmed the correlation of poor quality airborne gravity data collection to amplified aircraft motion. Motion in the aircraft is the combined effect of the airframe design, the autopilot and its performance, and the weather/wind regime. NOAA's National Geodetic Survey has launched the Gravity for the Redefinition of the American Vertical Datum project (GRAV-D) to provide the foundation for a new national vertical datum by 2022. This project requires collecting airborne gravity data covering the entire country and its holdings. The motion of the aircraft employed in this project is of prime importance because we use a beam-style gravimeter mounted on a gyro-stabilized platform to align the sensor to a time-averaged local vertical. Aircraft turbulence will tend to drive the platform off-level, allowing horizontal forces to map into the vertical gravity measurement. Recently, the GRAV-D project has experimented with two new factors in airborne gravity data collection. The first aspect is the use of the Aurora optionally piloted Centaur aircraft. This aircraft can be flown either with or without a pilot, but the autopilot is specifically designed to be very accurate. Incorporated into the much smaller frame of this aircraft is a new gravimeter developed by Micro-g LaCoste, called the Turnkey Airborne Gravimeter System 7 (TAGS7). This smaller, lighter instrument also has a new design whereby the beam is held fixed in an electromagnetic force field. The result of this new configuration is notably improved data quality in wind conditions higher than can be tolerated by our current system. So, which caused the improvement, the aircraft motion or the new meter? This study will start to tease apart these two effects with recently collected survey data. Specifically, we will compare the motion profile of the Centaur aircraft with other aircraft in the GRAV-D portfolio that we use successfully. In addition, we will investigate the relationship of aircraft motion, as measured by pitch, roll, and yaw, to airborne gravity quality in the Centaur operation as well as measurement aboard other aircraft with the beam-style sensor.

  7. 77 FR 24505 - Hazard Mitigation Assistance for Wind Retrofit Projects for Existing Residential Buildings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    ...] Hazard Mitigation Assistance for Wind Retrofit Projects for Existing Residential Buildings AGENCY... for Wind Retrofit Projects for Existing Residential Buildings. DATES: Comments must be received by... property from hazards and their effects. One such activity is the implementation of wind retrofit projects...

  8. 75 FR 61414 - Basin Electric Power Cooperative: South Dakota PrairieWinds Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-05

    ... that would feature 101 wind turbine generators; 6,000-square-foot operations and maintenance building... PrairieWinds Project AGENCY: Rural Utilities Service, USDA. ACTION: Notice of Availability of Record of... Dakota PrairieWind Project (Project) in Aurora, Bule and Jerauld Counties, South Dakota. The...

  9. 78 FR 28842 - Searchlight Wind Energy Project Record of Decision (DOE/EIS-0413)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... wind turbine generators (WTGs). The proposed Project includes a wind energy facility and a 230-kV... DEPARTMENT OF ENERGY Western Area Power Administration Searchlight Wind Energy Project Record of...), received a request from Searchlight Wind Energy, LLC (Searchlight) to interconnect its proposed Searchlight...

  10. 77 FR 55829 - Western Area Power Administration; Grapevine Canyon Wind Project Record of Decision (DOE/EIS-0427)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-11

    ... megawatts of electricity from wind turbine generators (WTGs). The proposed project includes a wind energy... about the installation of red flashing lights on wind turbine generators per Federal Aviation... DEPARTMENT OF ENERGY Western Area Power Administration; Grapevine Canyon Wind Project Record of...

  11. Simulator evaluation of display concepts for pilot monitoring and control of space shuttle approach and landing. Phase 2: Manual flight control

    NASA Technical Reports Server (NTRS)

    Gartner, W. B.; Baldwin, K. M.

    1973-01-01

    A study of the display requirements for final approach management of the space shuttle orbiter vehicle is presented. An experimental display concept, providing a more direct, pictorial representation of the vehicle's movement relative to the selected approach path and aiming points, was developed and assessed as an aid to manual flight path control. Both head-up, windshield projections and head-down, panel mounted presentations of the experimental display were evaluated in a series of simulated orbiter approach sequence. Data obtained indicate that the experimental display would enable orbiter pilots to exercise greater flexibility in implementing alternative final approach control strategies. Touchdown position and airspeed dispersion criteria were satisfied on 91 percent of the approach sequences, representing various profile and wind effect conditions. Flight path control and airspeed management satisfied operationally-relevant criteria for the two-segment, power-off orbiter approach and were consistently more accurate and less variable when the full set of experimental display elements was available to the pilot. Approach control tended to be more precise when the head-up display was used; however, the data also indicate that the head-down display would provide adequate support for the manual control task.

  12. Deployment of Wind Turbines in the Built Environment: Risks, Lessons, and Recommended Practices

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baring-Gould, Ian; Fields, Jason; Oteri, Frank

    Built-environment wind turbine (BEWT) projects are wind energy projects that are constructed on, in, or near buildings, as shown below. These projects present an opportunity for distributed, low-carbon generation combined with highly visible statements on sustainability, but the BEWT niche of the wind industry is still developing and is relatively less mature than the utility-scale wind or conventional ground-based distributed wind sectors. This poster investigates the current state of the BEWT industry by reviewing available literature on BEWT projects as well as interviewing project owners on their experiences deploying and operating the technology.

  13. Wind for Schools Project Power System Brief

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2007-08-01

    This fact sheet provides an overview of the system components of a Wind Powering America Wind for Schools project. Wind Powering America's (WPA's) Wind for Schools project uses a basic system configuration for each school project. The system incorporates a single SkyStream(TM) wind turbine, a 70-ft guyed tower, disconnect boxes at the base of the turbine and at the school, and an interconnection to the school's electrical system. A detailed description of each system component is provided in this document.

  14. Pilot-in-the-Loop CFD Method Development

    DTIC Science & Technology

    2015-04-30

    Comparison of Actuator Disk and Actuator Line Wind Turbine Models and Best Practices for Their Use,” Paper AIAA 2012-0900, 50th AIAA Aerospace...Field Actuator Disc Model,” Wind Energy, Vol. 1, (2), 1998, pp. 73–88. [4] Leclerc, C., and Masson, C., “ Wind Turbine Performance Predictions Using a...6] Mikkelsen, R., “Actuator Disc Methods Applied to Wind Turbines ,” Ph.D. thesis, Technical University of Denmark, Lyngby, Denmark, 2003. [7

  15. Wind Turbines in the Built Environment: Summary of a Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tinnesand, Heidi; Baring-Gould, Ian; Fields, Jason

    2016-09-28

    Built-environment wind turbine (BEWT) projects are wind energy projects that are constructed on, in, or near buildings. These projects present an opportunity for distributed, low-carbon generation combined with highly visible statements on sustainability, but the BEWT niche of the wind industry is still developing and is relatively less mature than the utility-scale wind or conventional ground-based distributed wind sectors. The findings presented in this presentation cannot be extended to wind energy deployments in general because of the large difference in application and technology maturity. This presentation summarizes the results of a report investigating the current state of the BEWT industrymore » by reviewing available literature on BEWT projects as well as interviewing project owners on their experiences deploying and operating the technology. The authors generated a series of case studies that outlines the pertinent project details, project outcomes, and lessons learned.« less

  16. 77 FR 24976 - Environmental Impact Statement for the Proposed Wheatgrass Ridge Wind Project, Fort Hall Indian...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-26

    ... Proposed Wheatgrass Ridge Wind Project, Fort Hall Indian Reservation, Idaho AGENCY: Bureau of Indian... proposed Wheatgrass Ridge Wind Project on the Fort Hall Indian Reservation, Idaho. FOR FURTHER INFORMATION... INFORMATION: The BIA is canceling work on this EIS because the proponent of the Wheatgrass Ridge Wind Project...

  17. Los Angeles County Metropolitan Transportation Authority climate change adaptation pilot project report.

    DOT National Transportation Integrated Search

    2013-08-01

    This Climate Change Adaptation Pilot Project Report details the project background of the recently-completed Los Angeles County : Metropolitan Transportation Authority (Metro) Transit Climate Change Adaptation Pilot Project as well as the various wor...

  18. 78 FR 57173 - Notice of Availability of the Record of Decision for the Mohave County Wind Farm Project, Mohave...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-17

    ... generated by the Project. The approved Project includes up to 243 wind turbine generators and associated..., operation, maintenance, and decommissioning of the Project to BP Wind Energy; and for the BLM to issue a ROW...; AZA32315AA] Notice of Availability of the Record of Decision for the Mohave County Wind Farm Project, Mohave...

  19. DOE/NREL supported wind energy activities in Indonesia

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Drouilhet, S.

    1997-12-01

    This paper describes three wind energy related projects which are underway in Indonesia. The first is a USAID/Winrock Wind for Island and Nongovernmental Development (WIND) project. The objectives of this project are to train local nongovernmental organizations (NGOs) in the siting, installation, operation, and maintenance of small wind turbines. Then to install up to 20 wind systems to provide electric power for productive end uses while creating micro-enterprises which will generate enough revenue to sustain the wind energy systems. The second project is a joint Community Power Corporation/PLN (Indonesian National Electric Utility) case study of hybrid power systems in villagemore » settings. The objective is to evaluate the economic viability of various hybrid power options for several different situations involving wind/photovoltaics/batteries/diesel. The third project is a World Bank/PLN preliminary market assessment for wind/diesel hybrid systems. The objective is to estimate the size of the total potential market for wind/diesel hybrid power systems in Indonesia. The study will examine both wind retrofits to existing diesel mini-grids and new wind-diesel plants in currently unelectrified villages.« less

  20. 75 FR 8687 - Combined Notice of Filings #2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-25

    ... Partners LLC, Fenton Power Partners I, LLC, Hoosier Wind Project, LLC, Northwest Wind Partners, LLC, Oasis Power Partners, LLC, Shiloh Wind Project 2, LLC, Wapsipinicon Wind Project, LLC. Description... Service Company of Colorado; Southwestern Public Service Company. Description: Northern States Power...

  1. An Initial Evaluation of Siting Considerations on Current and Future Wind Deployment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tegen, Suzanne; Lantz, Eric; Mai, Trieu

    This report provides a deeper understanding of the wind project development process, from desktop studies to a successful project in the ground. It examines three siting consideration categories that wind project sponsors must include in the development process: wildlife (species that live in, near, or migrate through the area where wind development is possible), radar (wind turbines can cause interference with radar signals), and public engagement (representing communities and stakeholders who live near wind power projects). The research shows that although this country's abundant wind resource provides numerous options for addressing siting considerations, actually siting individual projects is becoming moremore » difficult because of regulatory and other uncertainties. Model results are based on the premise that developers will be able to site, permit, and build successful projects, which is not always the case in reality.« less

  2. A study on aircraft map display location and orientation. [effects of map display location on manual piloting performance

    NASA Technical Reports Server (NTRS)

    Baty, D. L.; Wempe, T. E.; Huff, E. M.

    1973-01-01

    Six airline pilots participated in a fixed-base simulator study to determine the effects of two Horizontal Situation Display (HSD/map) panel locations relative to the Vertical Situation Display (VSD), and of three map orientations on manual piloting performance. Pilot comments and opinions were formally obtained. Significant performance differences were found between wind conditions, and among pilots, but not between map locations and orientations. The results also illustrate the potential tracking accuracy of such a display. Recommendations concerning display location and map orientation are made.

  3. CLASS: Coherent Lidar Airborne Shear Sensor. Windshear avoidance

    NASA Technical Reports Server (NTRS)

    Targ, Russell

    1991-01-01

    The coherent lidar airborne shear sensor (CLASS) is an airborne CO2 lidar system being designed and developed by Lockheed Missiles and Space Company, Inc. (LMSC) under contract to NASA Langley Research Center. The goal of this program is to develop a system with a 2- to 4-kilometer range that will provide a warning time of 20 to 40 seconds, so that the pilot can avoid the hazards of low-altitude wind shear under all weather conditions. It is a predictive system which will warn the pilot about a hazard that the aircraft will experience at some later time. The ability of the system to provide predictive warnings of clear air turbulence will also be evaluated. A one-year flight evaluation program will measure the line-of-sight wind velocity from a wide variety of wind fields obtained by an airborne radar, an accelerometer-based reactive wind-sensing system, and a ground-based Doppler radar. The success of the airborne lidar system will be determined by its correlation with the windfield as indicated by the onboard reactive system, which indicates the winds actually experienced by the NASA Boeing 737 aircraft.

  4. 77 FR 38823 - Notice of Availability of the Alta East Wind Project Draft Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ..., LVRWB11B4520] Notice of Availability of the Alta East Wind Project Draft Environmental Impact Statement... California Desert Conservation Area (CDCA) Plan Amendment (PA) for the Alta East Wind Project (AEWP), and by.../en/fo/ridgecrest/alta_east_wind_project.html . Email: [email protected] . Fax: 951 697-5299. Mail...

  5. 76 FR 64941 - Notice of Cancellation of Environmental Impact Statement for the Proposed Hyde County Wind Energy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-19

    ... Environmental Impact Statement for the Proposed Hyde County Wind Energy Center Project, Hyde County, SD AGENCY... design, construct, operate, and maintain a 150-megawatt Hyde County Wind Energy Center Project (Project... terminated the NEPA process for NextEra's proposed Hyde County Wind Energy Center Project with the...

  6. Systems Performance Analyses of Alaska Wind-Diesel Projects; St. Paul, Alaska (Fact Sheet)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baring-Gould, I.

    2009-04-01

    This fact sheet summarizes a systems performance analysis of the wind-diesel project in St. Paul, Alaska. Data provided for this project include load data, average wind turbine output, average diesel plant output, dump (controlling) load, average net capacity factor, average net wind penetration, estimated fuel savings, and wind system availability.

  7. Final Technical Report - DE-EE0003542

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Haley, James D

    Wind has provided energy for thousands of years: some of the earliest windmill engineering designs date back to ancient Babylonia and India where wind would be used as a source of irrigation. Today, wind is the quickest growing resource in Americas expanding energy infrastructure. However, to continue to positively diversify Americas energy portfolio and further reduce the countrys reliance of foreign oil, the industry must grow substantially over the next two decades in both turbine installations and skilled industrial manpower to support. The wind sector is still an emergent industry requiring maturation and development of its labor force: dedicated trainingmore » is needed to provide the hard and soft skills to support the increasingly complex wind turbine generators as the technology evolves. Furthermore, the American workforce is facing a steep decline in available labor resources as the baby boomer generation enters retirement age. It is therefore vital that a process is quickly created for supporting the next generation of wind technicians. However, the manpower growth must incorporate three key components. First, the safety and technical training curriculum must be standardized across the industry - current wind educational programs are disparate and dedicated standardization programs must be further refined and implemented. Second, it is essential that the wind sector avoid disrupting other energy production industries by cannibalizing workers, which would indirectly affect the rest of Americas energy portfolio. The future wind workforce must be created organically utilizing either young people entering the workforce or train personnel emerging from careers outside of energy production. Third, the training must be quick and efficient as large amounts of wind turbines are being erected each year and this growth is expected to continue until at least 2035. One source that matches these three requirements is personnel transitioning from military service to the civilian sector. Utilizing the labor pool of transitioning military personnel and a dedicated training program specifically tailored to military hard and soft skills, the wind workforce can rapidly expand with highly skilled personnel. A tailored training program also provides career opportunities to an underutilized labor force as the personnel return from active military duty. This projects goal was to create a Wind Workforce Development Program that streamlines the wind technician training process using industry-leading safety programs and building on existing military experience. The approach used was to gather data from the wind industry, develop the curriculum and test the process to ensure it provides adequate training to equip the technicians as they transition from the military into wind. The platform for the curriculum development is called Personal Qualification Standards (PQS), which is based on the program of the same name from the United States Navy. Not only would the program provide multiple delivery methods of training (including classroom, computer-based training and on-the-job training), but it also is a familiar style of training to many military men and women. By incorporating a familiar method of training, it encourages active participation in the training and reduces the time for personnel to grasp the concept and flow of the training requirements. The program was tested for thoroughness, schedule and efficacy using a 5-person pilot phase during the last two years. The results of the training were a reduction in time to complete training and increased customer satisfaction on client project sites. However, there were obstacles that surfaced and required adaptation throughout the project including method of delivery, curriculum development and project schedules and are discussed in detail throughout the report. There are several key recommendations in the report that discuss additional training infrastructure, scalability within additional alternative energy markets and organizational certification through standardization committees.« less

  8. Wind for Schools Project Curriculum Brief (Fact Sheet)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2010-08-01

    The U.S. Department of Energy's (DOE's) 20% Wind Energy by 2030 report recommends expanding education to ensure a trained workforce to meet the projected growth of the wind industry and deployment. Although a few U.S. higher education institutions offer wind technology education programs, most are found in community and technical colleges, resulting in a shortage of programs preparing highly skilled graduates for wind industry careers. Further, the United States lags behind Europe (which has more graduate programs in wind technology design and manufacturing) and is in danger of relinquishing the economic benefits of domestic production of wind turbines and relatedmore » components and services to European countries. DOE's Wind Powering America initiative launched the Wind for Schools project to develop a wind energy knowledge base among future leaders of our communities, states, and nation while raising awareness about wind energy's benefits. This fact sheet provides an overview of wind energy curricula as it relates to the Wind for Schools project.« less

  9. Eclipse program C-141A aircraft

    NASA Technical Reports Server (NTRS)

    1997-01-01

    This photograph shows the Air Force C-141A that was used in the Eclipse project as a tow vehicle. In 1997 and 1998, the Dryden Flight Research Center at Edwards, California, supported and hosted a Kelly Space & Technology, Inc. project called Eclipse, which sought to demonstrate the feasibility of a reusable tow-launch vehicle concept. The project goal was to successfully tow, inflight, a modified QF-106 delta-wing aircraft with an Air Force C-141A transport aircraft. This would demonstrate the possibility of towing and launching an actual launch vehicle from behind a tow plane. Dryden was the responsible test organization and had flight safety responsibility for the Eclipse project. Dryden provided engineering, instrumentation, simulation, modification, maintenance, range support, and research pilots for the test program. The Air Force Flight Test Center (AFFTC), Edwards, California, supplied the C-141A transport aircraft and crew and configured the aircraft as needed for the tests. The AFFTC also provided the concept and detail design and analysis as well as hardware for the tow system and QF-106 modifications. Dryden performed the modifications to convert the QF-106 drone into the piloted EXD-01 (Eclipse eXperimental Demonstrator-01) experimental aircraft. Kelly Space & Technology hoped to use the results gleaned from the tow test in developing a series of low-cost, reusable launch vehicles. These tests demonstrated the validity of towing a delta-wing aircraft having high wind loading, validated the tow simulation model, and demonstrated various operational procedures, such as ground processing of in-flight maneuvers and emergency abort scenarios.

  10. A pilot project to detect and forecast harmful algal blooms in the northern Gulf of Mexico.

    PubMed

    Fisher, William S; Malone, Thomas C; Giattina, James D

    2003-01-01

    More timely access to data and information on the initiation, evolution and effects of harmful algal blooms can reduce adverse impacts on valued natural resources and human health. To achieve this in the northern Gulf of Mexico, a pilot project was initiated to develop a user-driven, end-to-end (measurements to applications) observing system. A key strategy of the project is to coordinate existing state, federal and academic programs at an unprecedented level of collaboration and partnership. Resource managers charged with protection of public health and aquatic resources require immediate notice of algal events and a forecast of when, where and what adverse effects will likely occur. Further, managers require integrated analyses and interpretations, rather than raw data, to make effective decisions. Consequently, a functional observing system must collect and transform diverse measurements into usable forecasts. Data needed to support development of forecasts will include such properties as sea surface temperature, winds, currents and waves; precipitation and freshwater flows with related discharges of sediment and nutrients; salinity, dissolved oxygen, and chlorophyll concentrations (in vivo fluorescence); and remotely-sensed spatial images of sea surface chlorophyll concentrations. These data will be provided via a mixture of discrete and autonomous in situ sensing with near real-time data telemetry, and remote sensing from space (SeaWiFS), aircraft (hyperspectral imagery) or land (high-frequency radar). With calibration across these platforms, the project will ultimately provide a 4-dimensional visualization of harmful algae events in a time frame suitable to resource managers.

  11. Solar-powered Gossamer Penguin in flight

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Gossamer Penguin in flight above Rogers Dry Lakebed at Edwards, California, showing the solar panel perpendicular to the wing and facing the sun. Background The first flight of a solar-powered aircraft took place on November 4, 1974, when the remotely controlled Sunrise II, designed by Robert J. Boucher of AstroFlight, Inc., flew following a launch from a catapult. Following this event, AeroVironment, Inc. (founded in 1971 by the ultra-light airplane innovator--Dr. Paul MacCready) took on a more ambitious project to design a human-piloted, solar-powered aircraft. The firm initially took the human-powered Gossamer Albatross II and scaled it down to three-quarters of its previous size for solar-powered flight with a human pilot controlling it. This was more easily done because in early 1980 the Gossamer Albatross had participated in a flight research program at NASA Dryden in a program conducted jointly by the Langley and Dryden research centers. Some of the flights were conducted using a small electric motor for power. Gossamer Penguin The scaled-down aircraft was designated the Gossamer Penguin. It had a 71-foot wingspan compared with the 96-foot span of the Gossamer Albatross. Weighing only 68 pounds without a pilot, it had a low power requirement and thus was an excellent test bed for solar power. AstroFlight, Inc., of Venice, Calif., provided the power plant for the Gossamer Penguin, an Astro-40 electric motor. Robert Boucher, designer of the Sunrise II, served as a key consultant for both this aircraft and the Solar Challenger. The power source for the initial flights of the Gossamer Penguin consisted of 28 nickel-cadmium batteries, replaced for the solar-powered flights by a panel of 3,920 solar cells capable of producing 541 Watts of power. The battery-powered flights took place at Shafter Airport near Bakersfield, Calif. Dr. Paul MacCready's son Marshall, who was 13 years old and weighed roughly 80 pounds, served as the initial pilot for these flights to determine the power required to fly the airplane, optimize the airframe/propulsion system, and train the pilot. He made the first flights on April 7, 1980, and made a brief solar-powered flight on May 18. The official project pilot was Janice Brown, a Bakersfield school teacher who weighed in at slightly under 100 pounds and was a charter pilot with commercial, instrument, and glider ratings. She checked out in the plane at Shafter and made about 40 flights under battery and solar power there. Wind direction, turbulence, convection, temperature and radiation at Shafter in mid-summer proved to be less than ideal for Gossamer Penguin because takeoffs required no crosswind and increases in temperature reduced the power output from the solar cells. Consequently, the project moved to Dryden in late July, although conditions there also were not ideal. Nevertheless, Janice finished the testing, and on August 7, 1980, she flew a public demonstration of the aircraft at Dryden in which it went roughly 1.95 miles in 14 minutes and 21 seconds. This was significant as the first sustained flight of an aircraft relying solely on direct solar power rather than batteries. It provided the designers with practical experience for developing a more advanced, solar-powered aircraft, since the Gossamer Penguin was fragile and had limited controllability. This necessitated its flying early in the day when there were minimal wind and turbulence levels, but the angle of the sun was also low, requiring a panel for the solar cells that could be tilted toward the sun. Using the specific conclusions derived from their experience with Gossamer Penguin, the AeroVironment engineers designed Solar Challenger, a piloted, solar-powered aircraft strong enough to handle both long and high flights when encountering normal turbulence.

  12. Minor scale weather-watch and microbarograph project experiments 8620, 9415, 9416

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reed, J.W.; Church, H.W.

    1986-01-01

    Predictions and measurements of distant airblast propagations were made to identify, control, and document the environmental impact from this large explosion. Special meteorological observations were made to support this as well as other experiments. Rawinsonde balloon upper-air observations were made to about 30 km altitude. Pilot balloons were tracked by optical theodolite to give frequent wind observations to about 3 km above ground. A Tethersonde balloon was operated to give details on atmospheric structure below about 3 km. Rocketsondes were launched to measure temperature and wind conditions at 35- to 65-km heights, for explaining long range airblast propagations that focusmore » near 200 km distance. A meteorological towere was set up at the Admin Park to give continuous records of wind and temperature at three levels to 23 m height. An anemometer was installed near Ground Zero for reference during wind-sensitive helium bag operations. A weather advisory service was established, using WSMR observations as well as national weather data collections, and communicating through a computer terminal at the Stallion Radiosonde Station. Microbarograph (MB) airblast pressure recorders were operated at thirteen locations, from 3 km to 225 km from GZ. During the 10 days preceding MINOR SCALE, 31 ANFO charges, of 250 lb or 2500 lb yields, were fired to document the long range airblast propagation with MB recordings and upper air weather observations.« less

  13. The Learning Process and Technological Change in Wind Power: Evidence from China's CDM Wind Projects

    ERIC Educational Resources Information Center

    Tang, Tian; Popp, David

    2016-01-01

    The Clean Development Mechanism (CDM) is a project-based carbon trade mechanism that subsidizes the users of climate-friendly technologies and encourages technology transfer. The CDM has provided financial support for a large share of Chinese wind projects since 2002. Using pooled cross-sectional data of 486 registered CDM wind projects in China…

  14. 75 FR 11151 - Pacific Gas and Electric Company; Notice of Intent To File License Application, Filing of Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-10

    .... Name of Project: Humboldt WaveConnect Pilot Project. f. Location: The project would be located in the... Commission must include on the first page, the project name (Humboldt WaveConnect Pilot Project) and number (P-12779-005), and bear the heading ``Comments on the proposed Humboldt WaveConnect Pilot Project...

  15. A study on aircraft map display location and orientation

    NASA Technical Reports Server (NTRS)

    Baty, D. L.; Wempe, T.; Huff, E.

    1973-01-01

    Six airline pilots participated in a fixed-based simulator study to determine the effects of two horizontal situation display (HSD/map) panel locations relative to the vertical situation display (VSD), and of three map orientations on manual piloting performance. Pilot comments and opinions were formally obtained. Significant performance differences were found between wind conditions and among pilots but not between map locations and orientations. The results also illustrate the potential tracking accuracy of such a display. Recommendations concerning display location and map orientation are made.

  16. A study on aircraft map display location and orientation

    NASA Technical Reports Server (NTRS)

    Baty, D. L.; Wempe, T. E.; Huff, E. M.

    1974-01-01

    Six airline pilots participated in a fixed-base simulator study to determine the effects of two horizontal situation display (HSD/map) panel locations relative to the vertical situation display (VSD), and of three map orientations on manual piloting performance. Pilot comments and opinions were formally obtained. Significant performance differences were found between wind conditions and among pilots, but not between map locations and orientations. The results also illustrate the potential tracking accuracy of such a display. Recommendations concerning display location and map orientation are made.

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sotiropoulos, Fotis; Marr, Jeffrey D.G.; Milliren, Christopher

    In January 2010, the University of Minnesota, along with academic and industry project partners, began work on a four year project to establish new facilities and research in strategic areas of wind energy necessary to move the nation towards a goal of 20% wind energy by 2030. The project was funded by the U.S. Department of Energy with funds made available through the American Recovery and Reinvestment Act of 2009. $7.9M of funds were provided by DOE and $3.1M was provided through matching funds. The project was organized into three Project Areas. Project Area 1 focused on design and developmentmore » of a utility scale wind energy research facility to support research and innovation. The project commissioned the Eolos Wind Research Field Station in November of 2011. The site, located 20 miles from St. Paul, MN operates a 2.5MW Clipper Liberty C-96 wind turbine, a 130-ft tall sensored meteorological tower and a robust sensor and data acquisition network. The site is operational and will continue to serve as a site for innovation in wind energy for the next 15 years. Project Areas 2 involved research on six distinct research projects critical to the 20% Wind Energy by 2030 goals. The research collaborations involved faculty from two universities, over nine industry partners and two national laboratories. Research outcomes include new knowledge, patents, journal articles, technology advancements, new computational models and establishment of new collaborative relationships between university and industry. Project Area 3 focused on developing educational opportunities in wind energy for engineering and science students. The primary outcome is establishment of a new graduate level course at the University of Minnesota called Wind Engineering Essentials. The seminar style course provides a comprehensive analysis of wind energy technology, economics, and operation. The course is highly successful and will continue to be offered at the University. The vision of U.S. DOE to establish unique, open-access research facilities and creation of university-industry research collaborations in wind energy were achieved through this project. The University of Minnesota, through the establishment of the Eolos Wind Energy Consortium and the Eolos Wind Research Field Station continue to develop new research collaborations with industry partners.« less

  18. Wind Powering America's Wind for Schools Project: Summary Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baring-Gould, I.; Newcomb, C.

    This report provides an overview of the U.S. Department of Energy, Wind Powering America, Wind for Schools project. It outlines teacher-training activities and curriculum development; discusses the affiliate program that allows school districts and states to replicate the program; and contains reports that provide an update on activities and progress in the 11 states in which the Wind for Schools project operates.

  19. Wind for Schools Project Power System Brief, Wind Powering America Fact Sheet Series

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baring-Gould, I.

    2009-05-01

    Wind Powering America's (WPA's) Wind for Schools project uses a basic system configuration for each school project. The system incorporates a single SkyStream wind turbine, a 70-ft guyed tower, disconnect boxes at the base of the turbine and at the school, and an interconnection to the school's electrical system. This document provides a detailed description of each system component.

  20. FHWA bicycle-pedestrian count technology pilot project : summary report

    DOT National Transportation Integrated Search

    2016-12-01

    This report summarizes the Federal Highway Administration (FHWA)s one-year Bicycle-Pedestrian Count Technology Pilot Project. The purpose of the pilot project was to increase the organizational and technical capacity of Metropolitan Planning Organ...

  1. 77 FR 37395 - Combined Notice of Filings #2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-21

    ... Wind Power Partners, LLC, High Prairie Wind Farm II, LLC, Cloud County Wind Farm, LLC, Pioneer Prairie Wind Farm I, LLC, Sagebrush Power Partners, LLC, Arlington Wind Power Project LLC, Marble River, LLC... Power Project LLC, Blue Canyon Windpower II, LLC, Lost Lakes Wind Farm LLC, Blue Canyon Windpower V LLC...

  2. A piloted simulator evaluation of a ground-based 4-D descent advisor algorithm

    NASA Technical Reports Server (NTRS)

    Davis, Thomas J.; Green, Steven M.; Erzberger, Heinz

    1990-01-01

    A ground-based, four dimensional (4D) descent-advisor algorithm is under development at NASA-Ames. The algorithm combines detailed aerodynamic, propulsive, and atmospheric models with an efficient numerical integration scheme to generate 4D descent advisories. The ability is investigated of the 4D descent advisor algorithm to provide adequate control of arrival time for aircraft not equipped with on-board 4D guidance systems. A piloted simulation was conducted to determine the precision with which the descent advisor could predict the 4D trajectories of typical straight-in descents flown by airline pilots under different wind conditions. The effects of errors in the estimation of wind and initial aircraft weight were also studied. A description of the descent advisor as well as the result of the simulation studies are presented.

  3. An airborne FLIR detection and warning system for low altitude wind shear

    NASA Technical Reports Server (NTRS)

    Sinclair, Peter C.; Kuhn, Peter M.

    1991-01-01

    It is shown through some preliminary flight measurement research that a forward looking infrared radiometer (FLIR) system can be used to successfully detect the cool downdraft of downbursts (microbusts/macrobursts) and thunderstorm gust front outflows that are responsible for most of the low altitude wind shear (LAWS) events. The FLIR system provides a much greater safety margin for the pilot than that provided by reactive designs such as inertial air speed systems. Preliminary results indicate that an advanced airborne FLIR system could provide the pilot with remote indication of microburst (MB) hazards along the flight path ahead of the aircraft. Results of a flight test of a prototype FLIR system show that a minimum warning time of one to four minutes (5 to 10 km), depending on aircraft speed, is available to the pilot prior to the microburst encounter.

  4. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bolinger, Mark

    In the relatively brief history of utility-scale wind generation, the 'community wind' sector - defined here as consisting of relatively small utility-scale wind power projects that are at least partly owned by one or more members of the local community - has played a vitally important role as a 'test bed' or 'proving ground' for wind turbine manufacturers. In the 1980s and 1990s, for example, Vestas and other now-established European wind turbine manufacturers relied heavily on community wind projects in Scandinavia and Germany to install - and essentially field-test - new turbine designs. The fact that orders from community windmore » projects seldom exceeded more than a few turbines at a time enabled the manufacturers to correct any design flaws or manufacturing defects fairly rapidly, and without the risk of extensive (and expensive) serial defects that can accompany larger orders. Community wind has been slower to take root in the United States - the first such projects were installed in the state of Minnesota around the year 2000. Just as in Europe, however, the community wind sector in the U.S. has similarly served as a proving ground - but in this case for up-and-coming wind turbine manufacturers that are trying to break into the broader U.S. wind power market. For example, community wind projects have deployed the first U.S. installations of wind turbines from Suzlon (in 2003), DeWind (2008), Americas Wind Energy (2008) and later Emergya Wind Technologies (2010),1 Goldwind (2009), AAER/Pioneer (2009), Nordic Windpower (2010), Unison (2010), and Alstom (2011). Just as it has provided a proving ground for new turbines, so too has the community wind sector in the United States served as a laboratory for experimentation with innovative new financing structures. For example, a variation of one of the most common financing arrangements in the U.S. wind market today - the 'partnership flip structure' - was first developed by community wind projects in Minnesota more than a decade ago (and is therefore sometimes referred to as the 'Minnesota flip' model) before being adapted by the broader wind market. More recently, a handful of community wind projects built in the United States over the past year have been financed via new and creative structures that push the envelope of wind project finance in the U.S. - in many cases, moving beyond the now-standard partnership flip structures. These projects include: (1) a 4.5 MW project in Maine that combines low-cost government debt with local tax equity, (2) a 25.3 MW project in Minnesota using a sale/leaseback structure, (3) a 10.5 MW project in South Dakota financed by an intrastate offering of both debt and equity, (4) a 6 MW project in Washington state that taps into 'New Markets Tax Credits' using an 'inverted' or 'pass-through' lease structure, and (5) a 9 MW project in Oregon that combines a variety of state and federal incentives and loans with unconventional equity from high-net-worth individuals. In most cases, these are first-of-their-kind financing structures that could serve as useful examples for other projects - both community and commercial wind alike. This new wave of financial innovation occurring in the community wind sector has been facilitated by policy changes, most of them recent. Most notably, the American Recovery and Reinvestment Act of 2009 ('the Recovery Act') enables, for a limited time, wind power (and other types of) projects to elect either a 30% investment tax credit ('ITC') or a 30% cash grant (the 'Section 1603 grant') in lieu of the federal incentive that has historically been available to wind projects in the U.S. - a 10-year production tax credit ('PTC'). This flexibility, in turn, enables wind power projects to pursue lease financing for the first time - leasing is not possible under the PTC. Because they are based on a project's cost rather than energy generation, the 30% ITC and Section 1603 grant also reduce performance risk relative to the PTC - this, too, is an important enabler of lease financing. Finally, by providing a cash rather than tax incentive, the Section 1603 grant alone reduces (but does not eliminate) the need for tax appetite among project owners. All of these policy changes can be particularly useful to community wind projects, and have helped to support the different financial structures mentioned above. This special report - which is distilled from a longer Berkeley Lab report - briefly describes just two of these innovative new financing structures: the sale/leaseback structure used in Minnesota and the intrastate offering conducted in South Dakota. Readers interested in more detail on these two structures, as well as the other three projects not covered here, are encouraged to reference the full Berkeley Lab report.« less

  5. Head-up transition behavior of pilots during simulated low-visibility approaches

    NASA Technical Reports Server (NTRS)

    Haines, R. F.

    1980-01-01

    Each of 13 commercial pilots from four airlines flew a total of 108 manual flight director approaches in a moving base simulation of a medium-sized turbojet (95,000 lb gross weight) which had a day and night Redifon external scene. Three levels of runway visual range (RVR) (1,600; 2,400; and greater than 8,000 ft), three wind-shear profiles, nine ceiling heights, and continuous and intermittent visibility after initial breakout were tested. The results indicated that: (1) mean decision time ranged from 2 to 4.6 sec for ceilings under 380 ft across the three RVR conditions; (2) mean vertical distance traveled during the visual-cue assessment period was a relatively constant proportion below the existing ceiling; (3) a significant three way interaction in mean decision time between wind shear, day-night, and ceiling RVR variables occurred; (4) mean number of head-up transitions to VFR conditions after breakout ranged from 4.6 to 13.4 and increased as a function of ceiling and severity of wind shear; the typical duration of fixation out the window was 1.5 sec; and (5) subjective pilot ratings of controllability and precision of control as well as amount of skill, attention, or effort required to make the landing were influenced significantly by the wind shear, night conditions, and low breakout ceiling conditions.

  6. 2016 Wind Technologies Market Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wiser, Ryan H.; Bolinger, Mark

    The U.S. Department of Energy (DOE)’s Wind Technologies Market Report provides an annual overview of trends in the U.S. wind power market. You can find the report, a presentation, and a data file on the Files tab, below. Additionally, several data visualizations are available in the Data Visualizations tab. Highlights of this year’s report include: -Wind power additions continued at a rapid clip in 2016: $13 billion was invested in new wind power plants in 2016. In 2016, wind energy contributed 5.6% of the nation’s electricity supply, more than 10% of total electricity generation in fourteen states, and 29% tomore » 37% in three of those states—Iowa, South Dakota, and Kansas. -Bigger turbines are enhancing wind project performance: Increased blade lengths, in particular, have dramatically increased wind project capacity factors, one measure of project performance. For example, the average 2016 capacity factor among projects built in 2014 and 2015 was 42.6%, compared to an average of 32.1% among projects built from 2004 to 2011 and 25.4% among projects built from 1998 to 2001. -Low wind turbine pricing continues to push down installed project costs: Wind turbine prices have fallen from their highs in 2008, to $800–$1,100/kW. Overall, the average installed cost of wind projects in 2016 was $1,590/kW, down $780/kW from the peak in 2009 and 2010. -Wind energy prices remain low: After topping out at nearly 7¢/kWh for power purchase agreements (PPAs) executed in 2009, the national average price of wind PPAs has dropped to around 2¢/kWh—though this nationwide average is dominated by projects that hail from the lowest-priced Interior region of the country (such as Texas, Iowa, Oklahoma). These prices, which are possible in part due to federal tax support, compare favorably to the projected future fuel costs of gas-fired generation. -The supply chain continued to adjust to swings in domestic demand for wind equipment: Wind sector employment reached a new high of more than 101,000 full-time workers at the end of 2016. For wind projects recently installed in the U.S., domestically manufactured content is highest for nacelle assembly (>90%), towers (65-80%), and blades and hubs (50-70%), but is much lower (<20%) for most components internal to the turbine. -Continued strong growth in wind capacity is anticipated in the near term: With federal tax incentives still available, though declining, various forecasts for the domestic market show expected wind power capacity additions averaging more than 9,000 MW/year from 2017 to 2020.« less

  7. 77 FR 14010 - Rocky Ridge Wind Project, LLC, Blackwell Wind, LLC, CPV Cimarron Renewable Energy Company, LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-08

    ..., EG12-18-000, EG12-19-000, EG12- 20-000, EG12-21-000, EG12-22-000, EG12-23-000] Rocky Ridge Wind Project, LLC, Blackwell Wind, LLC, CPV Cimarron Renewable Energy Company, LLC, Minco Wind Interconnection Services, LLC, Shiloh III Lessee, LLC, California Ridge Wind Energy LLC, Perrin Ranch Wind, LLC, Erie Wind...

  8. NREL: Renewable Resource Data Center - Wind Resource Information

    Science.gov Websites

    and Actual Wind Turbine Sites (September 1982) and a Wind Energy Resource Atlas of the United States Wind Resource Information Photo of five wind turbines at the Nine Canyon Wind Project. The Nine Canyon Wind Project in Benton County, Washington, includes 37 wind turbines and 48 MW of capacity

  9. 75 FR 23666 - Huron-Manistee National Forests, White Pines Wind Farm Project, Mason County, MI

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-04

    ... DEPARTMENT OF AGRICULTURE Forest Service Huron-Manistee National Forests, White Pines Wind Farm... environmental impact statement for the White Pines Wind Farm Project on National Forest System (NFS) lands... terminates the environmental analysis process for the White Pines Wind Farm Project. DATES: The Notice of...

  10. 75 FR 2138 - Interconnection of the Proposed Hermosa West Wind Farm Project, Wyoming (DOE/EIS-0438)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-14

    ... SWE's proposed Project would consist of up to 200 wind turbine generators with a combined total... siting process for the wind turbine strings and associated facilities considered sensitive resources, and... West Wind Farm Project, Wyoming (DOE/EIS-0438) AGENCY: Western Area Power Administration, DOE. ACTION...

  11. 76 FR 40390 - Notice of Availability of a Draft Land Use Plan Amendment, Environmental Impact Statement and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-08

    ..., 474 megawatt (MW) wind energy project including 158 wind turbine generators, a substation... Environmental Impact Report for the Pattern Energy Group Ocotillo Express Wind Energy Project, Imperial County... Statement (EIS) and Draft Environmental Impact Report (EIR) for the Ocotillo Express Wind Energy Project...

  12. Wind for Schools: Developing Education Programs to Train the Next Generation of the Wind Energy Workforce

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baring-Gould, I.; Flowers, L.; Kelly, M.

    2009-08-01

    This paper provides an overview of the Wind for Schools project elements, including a description of host and collegiate school curricula developed for wind energy and the status of the current projects. The paper also provides focused information on how schools, regions, or countries can become involved or implement similar projects to expand the social acceptance and understanding of wind energy.

  13. Comprehensive Analysis of Two Downburst-Related Aircraft Accidents

    NASA Technical Reports Server (NTRS)

    Shen, J.; Parks, E. K.; Bach, R. E.

    1996-01-01

    Although downbursts have been identified as the major cause of a number of aircraft takeoff and landing accidents, only the 1985 Dallas/Fort Worth (DFW) and the more recent (July 1994) Charlotte, North Carolina, landing accidents provided sufficient onboard recorded data to perform a comprehensive analysis of the downburst phenomenon. The first step in the present analysis was the determination of the downburst wind components. Once the wind components and their gradients were determined, the degrading effect of the wind environment on the airplane's performance was calculated. This wind-shear-induced aircraft performance degradation, sometimes called the F-factor, was broken down into two components F(sub 1) and F(sub 2), representing the effect of the horizontal wind gradient and the vertical wind velocity, respectively. In both the DFW and Charlotte cases, F(sub 1) was found to be the dominant causal factor of the accident. Next, the aircraft in the two cases were mathematically modeled using the longitudinal equations of motion and the appropriate aerodynamic parameters. Based on the aircraft model and the determined winds, the aircraft response to the recorded pilot inputs showed good agreement with the onboard recordings. Finally, various landing abort strategies were studied. It was concluded that the most acceptable landing abort strategy from both an analytical and pilot's standpoint was to hold constant nose-up pitch attitude while operating at maximum engine thrust.

  14. Zone Logic Applications for Submarine Overhauls (The National Shipbuilding Research Program)

    DTIC Science & Technology

    1988-08-01

    outfitting and work packaging are parts of this more general management 5B-1 figure 1 - USS Bluefish Pilot Project Key Events figure 2 - USS Bluefish ...met. This approach to organizing work was expanded in the next pilot project on the overhaul of the USS Bluefish . Zone Outfitting on the USS Bluefish ...Portsmouth developed a pilot project on the overhaul of the USS Bluefish . The intention of this pilot project has been to explore the technical

  15. Misty picture weather-watch and microbarograph project: Experiments 9412-14-18

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reed, J.W.; Church, H.W.; Huck, T.W.

    1987-01-01

    Special meteorological observations and predictions for MISTY PICTURE are described. Ground zero measurements of winds and temperatures were used to develop predictions for needed light winds during the night for deployment of the helium bag for the precursor experiment. This also entailed correlations with the White Sands network of automated surface observation stations as well as general circulation and upper air reports from the regional synoptic weather observing and reporting network. Pilot balloon observations of upper winds and Tethersonde observations were made during bag deployment to further document local circulation developments. During the test countdown, radiosonde balloon observations of uppermore » air temperatures and winds were made to allow prediction of atmospheric effects on airblast propagation that could break windows to nearly 200 km range from the MISTY PICTURE explosion yield. These data indicated that there would be no strong off-site propagations on shot day, but at shot time the weak convergence zone in the shot area disturbed the wind pattern and generated a northwestward sound duct. Some banded airblast focusing resulted that gave relatively high overpressures just south of the Admin Park, at the Observer's Area, and in San Antonio where a number of windows were claimed broken. Relatively weak blasts, between caustics or foci, were recorded by microbarographs at Admin Park, Stallion, and Socorro. Very weak and barely detectable waves were propagated eastward to Carrizozo where MINOR SCALE had broken windows in 1985, and to the southeast toward Tularosa and Alamogordo. Five microbarograph stations were also operated around the west side of a 200 km radius circle, to document airblast waves ducted and focused by relatively high temperatures and easterly monsoon winds near 50 km altitudes. 15 refs., 39 figs., 16 tabs.« less

  16. 75 FR 34152 - Record of Decision for the Cape Wind Energy Project; Secretary of the Interior's Response to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-16

    ... Energy Project; Secretary of the Interior's Response to Comments From the Advisory Council on Historic Preservation on the Cape Wind Energy Project AGENCY: Minerals Management Service, Interior. ACTION: Notice of... announcing the availability of the ROD for the Cape Wind Energy Project (the Project). The ROD for the...

  17. Communicating Instantaneous Air Quality Data: Pilot Project

    EPA Pesticide Factsheets

    Communicating Instantaneous Air Quality Data: Pilot ProjectEPA is launching a pilot project to test a new tool for making instantaneous outdoor air quality data useful for the public. The new “sensor scale” is designed to be used with sensors

  18. 75 FR 45617 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-03

    ... Numbers: ER08-1226-007; ER08-1225-010; ER08-1111-008. Applicants: Cloud County Wind Farm, LLC, Pioneer Prairie Wind Farm I, LLC, Arlington Wind Power Project LLC. Description: Arlington Wind Power Project LLC... Wind Farm, L.P. Description: Waymart Wind Farm, L.P. submits tariff filing per 35.12: Waymart Baseline...

  19. Community Wind: Once Again Pushing the Envelope of Project Finance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    bolinger, Mark A.

    In the United States, the 'community wind' sector - loosely defined here as consisting of relatively small utility-scale wind power projects that sell power on the wholesale market and that are developed and owned primarily by local investors - has historically served as a 'test bed' or 'proving grounds' for up-and-coming wind turbine manufacturers that are trying to break into the U.S. wind power market. For example, community wind projects - and primarily those located in the state of Minnesota - have deployed the first U.S. installations of wind turbines from Suzlon (in 2003), DeWind (2008), Americas Wind Energy (2008)more » and later Emergya Wind Technologies (2010), Goldwind (2009), AAER/Pioneer (2009), Nordic Windpower (2010), Unison (2010), and Alstom (2011). Thus far, one of these turbine manufacturers - Suzlon - has subsequently achieved some success in the broader U.S. wind market as well. Just as it has provided a proving grounds for new turbines, so too has the community wind sector served as a laboratory for experimentation with innovative new financing structures. For example, a variation of one of the most common financing arrangements in the U.S. wind market today - the special allocation partnership flip structure (see Figure 1 in Section 2.1) - was first developed by community wind projects in Minnesota more than a decade ago (and is therefore sometimes referred to as the 'Minnesota flip' model) before being adopted by the broader wind market. More recently, a handful of community wind projects built over the past year have been financed via new and creative structures that push the envelope of wind project finance in the U.S. - in many cases, moving beyond the now-standard partnership flip structures involving strategic tax equity investors. These include: (1) a 4.5 MW project in Maine that combines low-cost government debt with local tax equity, (2) a 25.3 MW project in Minnesota using a sale/leaseback structure, (3) a 10.5 MW project in South Dakota financed by an intrastate offering of both debt and equity, (4) a 6 MW project in Washington state that taps into New Markets Tax Credits using an 'inverted' or 'pass-through' lease structure, and (5) a 9 MW project in Oregon that combines a variety of state and federal incentives and loans with unconventional equity from high-net-worth individuals. In most cases, these are first-of-their-kind structures that could serve as useful examples for other projects - both community and commercial wind alike. This report describes each of these innovative new financing structures in some detail, using a case-study approach. The purpose is twofold: (1) to disseminate useful information on these new financial structures, most of which are widely replicable; and (2) to highlight the recent policy changes - many of them temporary unless extended - that have facilitated this innovation. Although the community wind market is currently only a small sub-sector of the U.S. wind market - as defined here, less than 2% of the overall market at the end of 2009 (Wiser and Bolinger 2010) - its small size belies its relevance to the broader market. As such, the information provided in this report has relevance beyond its direct application to the community wind sector. The next two sections of this report briefly summarize how most community wind projects in the U.S. have been financed historically (i.e., prior to this latest wave of innovation) and describe the recent federal policy changes that have enabled a new wave of financial innovation to occur, respectively. Section 4 contains brief case studies of how each of the five projects mentioned above were financed, noting the financial significance of each. Finally, Section 5 concludes by distilling a number of general observations or pertinent lessons learned from the experiences of these five projects.« less

  20. Climate information for the wind energy industry in the Mediterranean Region

    NASA Astrophysics Data System (ADS)

    Calmanti, Sandro; Davis, Melanie; Schmidt, Peter; Dell'Aquila, Alessandro

    2013-04-01

    According to the World Wind Energy Association the total wind generation capacity worldwide has come close to cover 3% of the world's electricity demand in 2011. Thanks to the enormous resource potential and the relatively low costs of construction and maintenance of wind power plants, the wind energy sector will remain one of the most attractive renewable energy investment options. Studies reveal that climate variability and change pose a new challenge to the entire renewable energy sector, and in particular for wind energy. Stakeholders in the wind energy sector mainly use, if available, site-specific historical climate information to assess wind resources at a given project site. So far, this is the only source of information that investors (e.g., banks) are keen to accept for decisions concerning the financing of wind energy projects. However, one possible wind energy risk at the seasonal scale is the volatility of earnings from year to year investment. The most significant risk is therefore that not enough units of energy (or megawatt hours) can be generated from the project to capture energy sales to pay down debt in any given quarter or year. On the longer time scale the risk is that a project's energy yields fall short of their estimated levels, resulting in revenues that consistently come in below their projection, over the life of the project. The nature of the risk exposure determines considerable interest in wind scenarios, as a potential component of both the planning and operational phase of a renewable energy project. Fundamentally, by using climate projections, the assumption of stationary wind regimes can be compared to other scenarios where large scale changes in atmospheric circulation patterns may affect local wind regimes. In the framework of CLIM-RUN EU FP7 project, climate experts are exploring the potential of seasonal to decadal climate forecast techniques (time-frame 2012-2040) and regional climate scenarios (time horizon 2040+) over the Mediterranean Region as a tool for assessing the impact of changes in climate patterns on the energy output of wind power plants. Subsequently, we will give here a brief overview of these techniques as well as first results related to wind projections for different sites across the Mediterranean Region. We will highlight that regional climate models have a large potential for enhancing the quality of climate projections in the presence of complex orography and in the proximity of coastal areas.

  1. 77 FR 31839 - Wind and Water Power Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-30

    ... DEPARTMENT OF ENERGY Office of Energy Efficiency and Renewable Energy Wind and Water Power Program... projects. The 2012 Wind and Water Power Program, Wind Power Peer Review Meeting will review wind technology development and market acceleration and deployment projects from the Program's research and development...

  2. Physicians' accounts of frontline tensions when implementing pilot projects to improve primary care.

    PubMed

    Mansfield, Elizabeth; Bhattacharyya, Onil; Christian, Jennifer; Naglie, Gary; Steriopoulos, Vicky; Webster, Fiona

    2018-03-19

    Purpose Canada's primary care system has been described as "a culture of pilot projects" with little evidence of converting successful initiatives into funded, permanent programs or sharing project outcomes and insights across jurisdictions. Health services pilot projects are advocated as an effective strategy for identifying promising models of care and building integrated care partnerships in local settings. In the qualitative study reported here, the purpose of this paper is to investigate the strengths and challenges of this approach. Design/methodology/approach Semi-structured interviews were conducted with 34 primary care physicians who discussed their experiences as pilot project leads. Following thematic analysis methods, broad system issues were captured as well as individual project information. Findings While participants often portrayed themselves as advocates for vulnerable patients, mobilizing healthcare organizations and providers to support new models of care was discussed as challenging. Competition between local healthcare providers and initiatives could impact pilot project success. Participants also reported tensions between their clinical, project management and research roles with additional time demands and skill requirements interfering with the work of implementing and evaluating service innovations. Originality/value Study findings highlight the complexity of pilot project implementation, which encompasses physician commitment to addressing care for vulnerable populations through to the need for additional skill set requirements and the impact of local project environments. The current pilot project approach could be strengthened by including more multidisciplinary collaboration and providing infrastructure supports to enhance the design, implementation and evaluation of health services improvement initiatives.

  3. 75 FR 52374 - National Environmental Policy Act; NASA Glenn Research Center Plum Brook Station Wind Farm Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-25

    ...; NASA Glenn Research Center Plum Brook Station Wind Farm Project AGENCY: National Aeronautics and Space... Environmental Impact Statement (EIS) for the NASA GRC Plum Brook Station Wind Farm Project located near Sandusky... obtain public comments on construction and operation of the wind farm. The purpose of constructing and...

  4. 76 FR 29261 - Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Campo Wind Energy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-20

    ... Impact Statement for the Proposed Campo Wind Energy Project, San Diego County, CA AGENCY: Bureau of... (EIS) for the proposed Campo Shu'luuk Wind Project, located on the Campo Indian Reservation in...'luuk Wind Project within the Campo Reservation is subject to BIA approval of a lease and sublease...

  5. Launch Condition Deviations of Reusable Launch Vehicle Simulations in Exo-Atmospheric Zoom Climbs

    NASA Technical Reports Server (NTRS)

    Urschel, Peter H.; Cox, Timothy H.

    2003-01-01

    The Defense Advanced Research Projects Agency has proposed a two-stage system to deliver a small payload to orbit. The proposal calls for an airplane to perform an exo-atmospheric zoom climb maneuver, from which a second-stage rocket is launched carrying the payload into orbit. The NASA Dryden Flight Research Center has conducted an in-house generic simulation study to determine how accurately a human-piloted airplane can deliver a second-stage rocket to a desired exo-atmospheric launch condition. A high-performance, fighter-type, fixed-base, real-time, pilot-in-the-loop airplane simulation has been modified to perform exo-atmospheric zoom climb maneuvers. Four research pilots tracked a reference trajectory in the presence of winds, initial offsets, and degraded engine thrust to a second-stage launch condition. These launch conditions have been compared to the reference launch condition to characterize the expected deviation. At each launch condition, a speed change was applied to the second-stage rocket to insert the payload onto a transfer orbit to the desired operational orbit. The most sensitive of the test cases was the degraded thrust case, yielding second-stage launch energies that were too low to achieve the radius of the desired operational orbit. The handling qualities of the airplane, as a first-stage vehicle, have also been investigated.

  6. Workplace Literacy Pilot Projects: A Discussion Paper = Les Projects-pilotes en alphabetisation en milieu de travail: document de discussion.

    ERIC Educational Resources Information Center

    de Wolff, Alice

    From 1995-1998, 12 of the 79 organizations funded by Canada's National Literacy Secretariat (NLS) conducted approximately 40 workplace literacy pilot projects across Canada. Those projects were reviewed to determine their effectiveness in increasing the number and quality of Canadian workplace literacy programs. Information for the review was…

  7. The National Wind Energy Skills Assessment and Preparing for the Future Wind Workforce; NREL (National Renewable Energy Laboratory)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tegen, Suzanne

    2015-07-10

    A robust workforce is essential to growing domestic wind manufacturing capabilities. This presentation provides an overview of an NREL analysis of wind-focused education at American colleges and universities. The second part of the presentation discusses DOE/NREL workforce-related projects, such as the Wind Career Map, the Collegiate Wind Competition, and the Wind for Schools project.

  8. Final Scientific Report - Wind Powering America State Outreach Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sinclair, Mark; Margolis, Anne

    2012-02-01

    The goal of the Wind Powering America State Outreach Project was to facilitate the adoption of effective state legislation, policy, finance programs, and siting best practices to accelerate public acceptance and development of wind energy. This was accomplished by Clean Energy States Alliance (CESA) through provision of informational tools including reports and webinars as well as the provision of technical assistance to state leaders on wind siting, policy, and finance best practices, identification of strategic federal-state partnership activities for both onshore and offshore wind, and participation in regional wind development collaboratives. The Final Scientific Report - Wind Powering America Statemore » Outreach Project provides a summary of the objectives, activities, and outcomes of this project as accomplished by CESA over the period 12/1/2009 - 11/30/2011.« less

  9. Solar Wind Earth Exchange Project (SWEEP)

    DTIC Science & Technology

    2016-10-28

    AFRL-AFOSR-UK-TR-2016-0035 Solar Wind Earth Exchange Project 140200 Steven Sembay UNIVERSITY OF LEICESTER Final Report 10/28/2016 DISTRIBUTION A...To) 01 Sep 2014 to 31 Aug 2016 4. TITLE AND SUBTITLE Solar Wind Earth Exchange Project (SWEEP) 5a.  CONTRACT NUMBER 5b.  GRANT NUMBER FA9550-14-1...SUPPLEMENTARY NOTES 14. ABSTRACT The grant received from AFRL/AOFSR/EOARD funded the Solar Wind Earth Exchange Project (SWEEP) at Leicester University. The goal

  10. 75 FR 30391 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-01

    ... Time on Tuesday, June 8, 2010. Docket Numbers: EC10-72-000. Applicants: Cloud County Wind Farm, LLC, Pioneer Prairie Wind Farm I, LLC, Arlington Wind Power Project LLC. Description: Application for... Power Project LLC, Cloud County Wind Farm, LLC, and Pioneer Prairie Wind Farm I, LLC. Filed Date: 05/20...

  11. 75 FR 2844 - Green Mountam National Forest; Vermont; Deerfield Wind Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-19

    ... DEPARTMENT OF AGRICULTURE Forest Service Green Mountam National Forest; Vermont; Deerfield Wind... authorization from Deerfield Wind, LLC for the installation and operation of wind turbines on National Forest... original notice of intent to prepare the Deerfield Wind Project EIS was published in the Federal Register...

  12. 75 FR 49517 - Notice of Intent To Prepare an Environmental Impact Statement for the Walker Ridge Wind Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-13

    ... system. The proposed action would include up to 42 wind turbine generators, an underground electrical...] Notice of Intent To Prepare an Environmental Impact Statement for the Walker Ridge Wind Project, Lake and...: You may submit comments related to the Walker Ridge Wind Project by any of the following methods: Web...

  13. Smooth Transition for Advancement to Graduate Education (STAGE) for Underrepresented Groups in the Mathematical Sciences Pilot Project: Broadening Participation through Mentoring

    ERIC Educational Resources Information Center

    Eubanks-Turner, Christina; Beaulieu, Patricia; Pal, Nabendu

    2018-01-01

    The Smooth Transition for Advancement to Graduate Education (STAGE) project was a three-year pilot project designed to mentor undergraduate students primarily from under-represented groups in the mathematical sciences. The STAGE pilot project focused on mentoring students as they transitioned from undergraduate education to either graduate school…

  14. The Tall Wind project - exploring the wind profile and boundary-layer height in the atmosphere's first kilometer over flat terrain.

    NASA Astrophysics Data System (ADS)

    Gryning, S. E.; Batchvarova, E.; Pena, A.; Mikkelsen, T.; Brümmer, B.; Emeis, S.; Gulstad, L.; Lee, N.

    2010-09-01

    Predicting the wind at typical heights of present and future wind turbines is a considerable scientific challenge. Presently applied models are accurate within the surface layer. New measurements and instrument synergies are necessary as basis for developing new wind models and understanding the physical processes that form the wind profile in order to describe the wind profile above it. Analysis of the wind and turbulence profiles from a meteorological mast at heights up to 160 meters and wind lidars up to 300 meters at the National test station at Høvsøre, Denmark, shows deviations of the wind profile above 80 meters the from the profile used so far near the surface. It also reveals the importance of the boundary-layer height as a physical parameter for the description of the wind profile. In the Tall Wind project, mast and lidar measurements of wind and fluxes will be combined with monitoring of the boundary-layer height by use of an aerosol lidar. At the main project monitoring sites (Høvsøre in Denmark and Hamburg in Germany) long term monitoring programmes on tall masts (160 and 300 meters) already exists and will be intensified. As part of the project the wind profile will be measured up to 1000 meters by a wind lidar (windcube) and the boundary-layer height by an aerosol lidar. The new data sets can be used for theoretical developments and evaluation of meso-scale meteorological models. The project is an international collaboration between academia (Risoe-DTU, HU and KIT) and industry (Vestas and DONG), funded by the Danish Research Agency, the Strategic Research Council (Sagsnr. 2104-08-0025). In the paper the set-up of the Tall Wind project will be described and some first results and experience will be presented.

  15. Evaluation of microwave landing system approaches in a wide-body transport simulator

    NASA Technical Reports Server (NTRS)

    Summers, L. G.; Feather, J. B.

    1992-01-01

    The objective of this study was to determine the suitability of flying complex curved approaches using the microwave landing system (MLS) with a wide-body transport aircraft. Fifty pilots in crews of two participated in the evaluation using a fixed-base simulator that emulated an MD-11 aircraft. Five approaches, consisting of one straight-in approach and four curved approaches, were flown by the pilots using a flight director. The test variables include the following: (1) manual and autothrottles; (2) wind direction; and (3) type of navigation display. The navigation display was either a map or a horizontal situation indicator (HSI). A complex wind that changed direction and speed with altitude, and included moderate turbulence, was used. Visibility conditions were Cat 1 or better. Subjective test data included pilot responses to questionnaires and pilot comments. Objective performance data included tracking accuracy, position error at decision height, and control activity. Results of the evaluation indicate that flying curved MLS approaches with a wide-body transport aircraft is operationally acceptable, depending upon the length of the final straight segment and the complexity of the approach.

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lantz, E.; Tegen, S.

    'Community wind' refers to a class of wind energy ownership structures. The extent of local ownership may range from a small minority share to full ownership by persons in the immediate area surrounding the wind project site. Potential project owners include local farmers, businesses, Native American tribes, universities, cooperatives, or any other local entity seeking to invest in wind energy. The opposite of community wind is an 'absentee' project, in which ownership is completely removed from the state and community surrounding the facility. Thus, there is little or no ongoing direct financial benefit to state and local populations aside frommore » salaries for local repair technicians, local property tax payments, and land lease payments. In recent years, the community wind sector has been inhibited by manufacturers' preference for larger turbine orders. This often puts smaller community wind developers and projects at a competitive disadvantage. However, state policies specifically supporting community wind may become a more influential market factor as turbines are now more readily available given manufacturer ramp-ups and the slow-down in the industry that has accompanied the recent economic and financial crises. This report examines existing literature to provide an overview of economic impacts resulting from community wind projects, compares results, and explains variability.« less

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lantz, E.; Tegen, S.

    "Community wind" refers to a class of wind energy ownership structures. The extent of local ownership may range from a small minority share to full ownership by persons in the immediate area surrounding the wind project site. Potential project owners include local farmers, businesses, Native American tribes, universities, cooperatives, or any other local entity seeking to invest in wind energy. The opposite of community wind is an "absentee" project, in which ownership is completely removed from the state and community surrounding the facility. Thus, there is little or no ongoing direct financial benefit to state and local populations aside frommore » salaries for local repair technicians, local property tax payments, and land lease payments. In recent years, the community wind sector has been inhibited by manufacturers' preference for larger turbine orders. This often puts smaller community wind developers and projects at a competitive disadvantage. However, state policies specifically supporting community wind may become a more influential market factor as turbines are now more readily available given manufacturer ramp-ups and the slow-down in the industry that has accompanied the recent economic and financial crises. This report examines existing literature to provide an overview of economic impacts resulting from community wind projects, compares results, and explains variability.« less

  18. Onshore Wind Farms: Value Creation for Stakeholders in Lithuania

    NASA Astrophysics Data System (ADS)

    Burinskienė, Marija; Rudzkis, Paulius; Kanopka, Adomas

    With the costs of fossil fuel consistently rising worldwide over the last decade, the development of green technologies has become a major goal in many countries. Therefore the evaluation of wind power projects becomes a very important task. To estimate the value of the technologies based on renewable resources also means taking into consideration social, economic, environmental, and scientific value of such projects. This article deals with economic evaluation of electricity generation costs of onshore wind farms in Lithuania and the key factors that have influence on wind power projects and offer a better understanding of social-economic context behind wind power projects. To achieve these goals, this article makes use of empirical data of Lithuania's wind power farms as well as data about the investment environment of the country.Based on empirical data of wind power parks, the research investigates the average wind farm generation efficiency in Lithuania. Employing statistical methods the return on investments of wind farms in Lithuania is calculated. The value created for every party involved and the total value of the wind farm is estimated according to Stakeholder theory.

  19. Optimal Locations for Siting Wind Energy Projects: Technical Challenges, Economics, and Public Preferences

    NASA Astrophysics Data System (ADS)

    Lamy, Julian V.

    Increasing the percentage of wind power in the United States electricity generation mix would facilitate the transition towards a more sustainable, low-pollution, and environmentally-conscious electricity grid. However, this effort is not without cost. Wind power generation is time-variable and typically not synchronized with electricity demand (i.e., load). In addition, the highest-output wind resources are often located in remote locations, necessitating transmission investment between generation sites and load. Furthermore, negative public perceptions of wind projects could prevent widespread wind development, especially for projects close to densely-populated communities. The work presented in my dissertation seeks to understand where it's best to locate wind energy projects while considering these various factors. First, in Chapter 2, I examine whether energy storage technologies, such as grid-scale batteries, could help reduce the transmission upgrade costs incurred when siting wind projects in distant locations. For a case study of a hypothetical 200 MW wind project in North Dakota that delivers power to Illinois, I present an optimization model that estimates the optimal size of transmission and energy storage capacity that yields the lowest average cost of generation and transmission (/MWh). I find that for this application of storage to be economical, energy storage costs would have to be 100/kWh or lower, which is well below current costs for available technologies. I conclude that there are likely better ways to use energy storage than for accessing distant wind projects. Following from this work, in Chapter 3, I present an optimization model to estimate the economics of accessing high quality wind resources in remote areas to comply with renewable energy policy targets. I include temporal aspects of wind power (variability costs and correlation to market prices) as well as total wind power produced from different farms. I assess the goal of providing 40 TWh of new wind generation in the Midwestern transmission system (MISO) while minimizing system costs. Results show that building wind farms in North/South Dakota (windiest states) compared to Illinois (less windy, but close to population centers) would only be economical if the incremental transmission costs to access them were below 360/kW of wind capacity (break-even value). Historically, the incremental transmission costs for wind development in North/South Dakota compared to in Illinois are about twice this value. However, the break-even incremental transmission cost for wind farms in Minnesota/Iowa (also windy states) is 250/kW, which is consistent with historical costs. I conclude that for the case in MISO, building wind projects in more distant locations (i.e., Minnesota/Iowa) is most economical. My two final chapters use semi-structured interviews (Chapter 4) and conjoint-based surveys (Chapter 5) to understand public perceptions and preferences for different wind project siting characteristics such as the distance between the project and a person's home (i.e., "not-in-my-backyard" or NIMBY) and offshore vs. onshore locations. The semi-structured interviews, conducted with members of a community in Massachusetts, revealed that economic benefit to the community is the most important factor driving perceptions about projects, along with aesthetics, noise impacts, environmental benefits, hazard to wildlife, and safety concerns. In Chapter 5, I show the results from the conjoint survey. The study's sample included participants from a coastal community in Massachusetts and a U.S.-wide sample from Amazon's Mechanical Turk. Results show that participants in the U.S.-wide sample perceived a small reduction in utility, equivalent to $1 per month, for living within 1 mile of a project. Surprisingly, I find no evidence of this effect for participants in the coastal community. The most important characteristic to both samples was the economic benefits from the project - both to their community through increased tax revenue, and to individuals through reduced monthly energy bills. Further, participants in both samples preferred onshore to offshore projects, but that preference was much stronger in the coastal community. I also find that participants from the coastal community preferred expanding an existing wind projects rather than building an entirely new one, whereas those in the U.S.-wide sample were indifferent, and equally supportive of the two options. These differences are likely driven by the prior positive experience the coastal community has had with an existing onshore wind project as well as their strong cultural identity that favors ocean views. I conclude that preference for increased distance from a wind project (NIMBY) is likely small or non-existent and that offshore wind projects within 5 miles from shore could cause large welfare losses to coastal communities. Finally, in Chapter 6, I provide a discussion and policy recommendations from my work. Importantly, I recommend that future research should combine the various topics throughout my chapters (i.e., transmission requirements, hourly power production, variability impacts to the grid, and public preferences) into a comprehensive model that identifies optimal locations for wind projects across the United States.

  20. Caught in a Severe Thunderstorm, Fuel Is Low, Passenger Having Heart Attack, Hydraulics Are Failing, Instruments Are Iffy, and No Airport Is in Sight: Quick--As the Pilot, What Do You Do?

    ERIC Educational Resources Information Center

    Budden, Michael Craig; Budden, Connie Browning

    2007-01-01

    University administrators can take a cue from pilots. Pilots regularly face decision situations where much lies in the balance. So it is with university administrators. The department, college or university itself can be compared to an aircraft. In flight, there are times when the sun shines and winds are favorable: a comfortable flight results…

  1. Plans and status of the NASA-Lewis Research Center wind energy project

    NASA Technical Reports Server (NTRS)

    Thomas, R.; Puthoff, R.; Savino, J.; Johnson, W.

    1975-01-01

    Wind energy is investigated as a source of energy. The wind energy program that is managed by the NASA-Lewis Research Center is described. The Lewis Research Center's Wind Power Office, its organization, plans, and status are discussed. Major elements of the wind power project included are: an experimental 100 kW wind-turbine generator; first generation industry-built and user-operated wind turbine generators; and supporting research and technology tasks.

  2. Should future wind speed changes be taken into account in wind farm development?

    NASA Astrophysics Data System (ADS)

    Devis, Annemarie; Van Lipzig, Nicole P. M.; Demuzere, Matthias

    2018-06-01

    Accurate wind resource assessments are crucial in the development of wind farm projects. However, it is common practice to estimate the wind yield over the next 20 years from short-term measurements and reanalysis data of the past 20 years, even though wind climatology is expected to change under the future climate. The present work examines future changes in wind power output over Europe using an ensemble of ESMs. The power output is calculated using the entire wind speed PDF and a non-constant power conversion coefficient. Based on this method, the ESM ensemble projects changes in near-future power outputs with a spatially varying magnitude between ‑12% and 8%. The most extreme changes occur over the Mediterranean region. For the first time, the sensitivity of these future change in power output to the type of wind turbine is also investigated. The analysis reveals that the projected wind power changes may vary in up to half of their magnitude, depending on the type of turbine and region of interest. As such, we recommend that wind industries fully account for projected near-future changes in wind power output by taking them into account as a well-defined loss/gain and uncertainty when estimating the yield of a future wind farm.

  3. Pilot for Alaska Students with Deaf-Blindness: Inclusion in Regular Classrooms (PALS). Final Performance Report, October 1, 1992 to September 30, 1995.

    ERIC Educational Resources Information Center

    Brown, DiAnn; Maiuri, Fran

    This final report describes a pilot 3-year project in Alaska to include children with deaf-blindness in regular classrooms. The project established and supported two pilot sites for inclusion of students with deaf-blindness, one urban and one rural. As a result of the project, three out of four pilot site students moved from self-contained special…

  4. Wind Energy Workforce Development: A Roadmap to a Wind Energy Educational Infrastructure (Presentation)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baring-Gould, I.

    2011-05-01

    Wind Powering America national technical director Ian Baring-Gould made this presentation about workforce development in the wind energy industry to an audience at the American Wind Energy Association's annual WINDPOWER conference in Anaheim. The presentation outlines job projections from the 20% Wind Energy by 2030 report and steps to take at all levels of educational institutions to meet those projections.

  5. Large experimental wind turbines: Where we are now

    NASA Technical Reports Server (NTRS)

    Thomas, R. L.

    1976-01-01

    Several large wind turbine projects have been initiated by NASA-Lewis as part of the ERDA wind energy program. The projects consist of progressively large wind turbine ranging from 100 kW with a rotor diameter of 125 feet to 1500 kW with rotor diameters of 200 to 300 feet. Also included is supporting research and technology for large wind turbines and for lowering the costs and increasing the reliability of the major wind turbine components. The results and status of the above projects are briefly discussed in this report. In addition, a brief summary and status of the plans for selecting the utility sites for the experimental wind turbines is also discussed.

  6. 75 FR 6020 - Electrical Interconnection of the Lower Snake River Wind Energy Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-05

    ... River Wind Energy Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE... (BPA) has decided to offer Puget Sound Energy Inc., a Large Generator Interconnection Agreement for... and Columbia counties, Washington. To interconnect the Wind Project, BPA will construct a new...

  7. 75 FR 27550 - Electrical Interconnection of the Juniper Canyon I Wind Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-17

    ... Canyon I Wind Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of Availability of Record of Decision (ROD). SUMMARY: The Bonneville Power Administration (BPA... County, Washington. To interconnect the Wind Project, BPA will expand an existing substation (Rock Creek...

  8. The 80 megawatt wind power project at Kahuku Point, Hawaii

    NASA Technical Reports Server (NTRS)

    Laessig, R. R.

    1982-01-01

    Windfarms Ltd. is developing the two largest wind energy projects in the world. Designed to produce 80 megawatts at Kahuku Point, Hawaii and 350 megawatts in Solano County, California, these projects will be the prototypes for future large-scale wind energy installations throughout the world.

  9. 77 FR 14416 - Notice of Availability of a Final Environmental Impact Statement and Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-09

    ... wind turbine generators; a substation; administration, operations and maintenance facilities... Action (the ``Refined Project''). Under the Refined Project configuration, only 112 wind turbines... Report for the Pattern Energy Group's Ocotillo Express Wind Energy Project and Proposed California Desert...

  10. Ten Decades of Rural Development: Lessons from India.

    DTIC Science & Technology

    1978-01-01

    37 9.1 Imitations of the TVA model 38 9.2 Pilot projects of the sixties--Comilla, Puebla & CADU . 39 10. THE SEVENTIES--A DECADE OF CONSOLIDATION OF...imitators in poor countries. 39 9.2 Pilot projects of the sixties--Comilla, Puebla, and CADU For a few years, in the sixties, three pilot projects attracted...the attention of international experts. These were the Comilla Projects in Bangladesh, Puebla in Mexico, and CADU Project in Ethiopia. 1 The Comilla

  11. Session: What can we learn from developed wind resource areas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thelander, Carl; Erickson, Wally

    This session at the Wind Energy and Birds/Bats workshop was composed of two parts intended to examine what existing science tells us about wind turbine impacts at existing wind project sites. Part one dealt with the Altamont Wind Resource area, one of the older wind projects in the US, with a paper presented by Carl Thelander titled ''Bird Fatalities in the Altamont Pass Wind Resource Area: A Case Study, Part 1''. Questions addressed by the presenter included: how is avian habitat affected at Altamont and do birds avoid turbine sites; are birds being attracted to turbine strings; what factors contributemore » to direct impacts on birds by wind turbines at Altamont; how do use, behavior, avoidance and other factors affect risk to avian species, and particularly impacts those species listed as threatened, endangered, or of conservation concern, and other state listed species. The second part dealt with direct impacts to birds at new generation wind plants outside of California, examining such is sues as mortality, avoidance, direct habitat impacts from terrestrial wind projects, species and numbers killed per turbine rates/MW generated, impacts to listed threatened and endangered species, to USFWS Birds of Conservation Concern, and to state listed species. This session focused on newer wind project sites with a paper titled ''Bird Fatality and Risk at New Generation Wind Projects'' by Wally Erickson. Each paper was followed by a discussion/question and answer period.« less

  12. PG&E WaveConnect Program Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brendan P. Dooher; Edward Cheslak; Robert Booth

    The PG&E WaveConnect project was intended to demonstrate the technical and economic viability of wave power in the open ocean adjacent to PG&E's service territory. WaveConnect was conceived as a multi-stage development process leading to long-term megawatt-scale wave power production. The first-stage tasks consisted of site selection, permitting, pilot plant design, and assessment of technology and commercial readiness. The second stage would have included development of infrastructure, undersea cabling, and deployment of wave energy conversion devices (WECs). In the third stage, the most promising WEC devices would have been deployed in larger quantities and connected to the grid. This reportmore » documents the findings of Stage One. Site Selection: After studying the wave energy potential, grid interconnection and other project infrastructure along the California coast, PG&E selected two sites: one near Eureka, called the Humboldt WaveConnect (HWC) project, and another near Vandenberg Air Force Base, called the Central Coast WaveConnect project (CCWC). Permitting: FERC issued PG&E preliminary permits for HWC in 2008 and for CCWC in 2010. PG&E chose to use FERC's Pilot Project Licensing Process, which was intended to streamline licensing to allow relatively quick and easy installation, operation, and environmental testing for pilot projects. Permitting, however, proved to be complicated, time-consuming and expensive, mainly because of the uncertain impacts of WEC devices. PG&E learned that even under the PPLP the project would still require a full analysis under CEQA, including an EIR, as well as Monitoring and Adaptive Management Programs and other requirements that had significant cost and scheduling implications. A majority of efforts were expended on permitting activities. Pilot Plant Design: PG&E prepared a conceptual design for a 5-MW pilot test facility at the Humboldt site, which consisted of an off-shore deployment area where WECs of different designs and from different device manufacturers could be tested. PG&E was to provide permitting, subsea cables, and on-shore facilities necessary to connect WaveConnect to an existing PG&E substation, while the WEC manufacturers would provide, operate and maintain their devices during the test period. Technology and Commercial Readiness: PG&E issued a Request for Information to the wave power industry to assess the technical and commercial capabilities of WEC manufacturers. Sixteen manufacturers responded, representing the four best-known and most mature designs. PG&E found that WECs are early-stage devices with evolving designs and little real-world operating experience. These characteristics made environmental impacts difficult to assess, which complicated permitting efforts. It also made a megawatt-scale demonstration project difficult to support because early stage WECs are costly and have limited track records for performance and reliability. Results: PG&E withdrew its FERC DPLA for HWC in November 2010 and surrendered its preliminary permit for CCWC in May 2011, effectively discontinuing the project for the following combination of reasons: Permitting issues were much more challenging than originally anticipated. Stage One project funding of $6 million proved insufficient to complete the necessary development and permitting work. During Stage One development, PG&E determined that permitting costs would be $2 million to $5 million greater than originally budgeted. The cost of developing a five-year, 5-MW pilot project at Humboldt Bay is much greater than the $15 million to $20 million originally estimated. Even assuming that vendors provide WEC devices at no cost to the utility, which was the proposed strategy with WaveConnect, PG&E concluded that a pilot project comparable to HWC would cost approximately $47 million. If WEC devices were purchased for such a project, its total cost would be on the order of $90 million. It is unclear when or if wave power will become competitive with renewable energy alternatives. Significant additional investment in design, testing and demonstration will be needed to improve designs and reduce costs. Using a vendor-provided installed cost goal of $2500/kW for mature WECs in five to 10 years, PG&E concluded that their LCOE would be in the range of $175-$250/MWh, which is not competitive with current or near-term renewable alternatives such as wind or solar photovoltaics. Although PG&E discontinued the project and no WEC devices were deployed, WaveConnect advanced PG&E's understanding of the technological, engineering, permitting, environmental, economic, stakeholder, and related issues involved in undertaking any wave power project now or in the future. As WEC technologies mature, and regulatory and permitting agencies grow more familiar with their environmental impacts, PG&E believes that wave power will merit further evaluation, demonstration and deployment.« less

  13. Wind power live! An interactive exhibit and related programs about wind generated energy at the Science Museum of Minnesota. Final performance report, February 1, 1995--September 30, 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hamilton, P.

    The final performance report for the Wind Power Live! museum exhibit summarizes the goals and outcomes for the project. Project goals included: (1) help museum visitors understand why wind is being considered as a significant energy source; (2) enable visualization of the dynamics and power output of turbines; (3) exhibit a working wind turbine; (4) showcase wind as a technological success story; (5) consider the environmental costs and benefits of wind energy; (6) examine the economics of wind power, and (7) explain some of the limits to wind power as a commercial energy source. The methods of meeting the projectmore » goals through the museum exhibit are briefly outlined in the report. Goal number three, to introduce a working wind turbine, was dropped from the final project.« less

  14. 7 CFR Appendix A to Part 4280 - Technical Reports for Projects With Total Eligible Project Costs of $200,000 or Less

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... of the wind turbine is 100kW or smaller and with a generator hub height of 120 feet or less. Small... demonstrate the amount of local wind resource where the small wind turbine is to be installed. Indicate the... of the individual wind turbine(s) is larger than 100kW. (a) Qualifications of key project service...

  15. 7 CFR Appendix A to Part 4280 - Technical Reports for Projects With Total Eligible Project Costs of $200,000 or Less

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... of the wind turbine is 100kW or smaller and with a generator hub height of 120 feet or less. Small... demonstrate the amount of local wind resource where the small wind turbine is to be installed. Indicate the... of the individual wind turbine(s) is larger than 100kW. (a) Qualifications of key project service...

  16. Evaluating Quality in Educational Spaces: OECD/CELE Pilot Project

    ERIC Educational Resources Information Center

    von Ahlefeld, Hannah

    2009-01-01

    CELE's International Pilot Project on Evaluating Quality in Educational Spaces aims to assist education authorities, schools and others to maximise the use of and investment in learning environments. This article provides an update on the pilot project, which is currently being implemented in Brazil, Mexico, New Zealand, Portugal and the United…

  17. Washington State Need Grant: Less-Than-Halftime Pilot Project (SHB 1345)

    ERIC Educational Resources Information Center

    Washington Higher Education Coordinating Board, 2006

    2006-01-01

    The 2005 Washington State Legislature authorized, through Substitute House Bill 1345, a two-year pilot project allowing eligible students, who enroll for four or five credits in a term, to receive the State Need Grant (SNG). Several important policy considerations emerged during the pilot project. Board staff explored these issues with financial…

  18. Benchmark Report on Key Outage Attributes: An Analysis of Outage Improvement Opportunities and Priorities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Germain, Shawn St.; Farris, Ronald

    2014-09-01

    Advanced Outage Control Center (AOCC), is a multi-year pilot project targeted at Nuclear Power Plant (NPP) outage improvement. The purpose of this pilot project is to improve management of NPP outages through the development of an AOCC that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This report documents the results of a benchmarking effort to evaluate the transferability of technologies demonstrated at Idaho National Laboratory and the primary pilot project partner, Palo Verde Nuclear Generating Station. The initial assumption for this pilot project was that NPPs generally domore » not take advantage of advanced technology to support outage management activities. Several researchers involved in this pilot project have commercial NPP experience and believed that very little technology has been applied towards outage communication and collaboration. To verify that the technology options researched and demonstrated through this pilot project would in fact have broad application for the US commercial nuclear fleet, and to look for additional outage management best practices, LWRS program researchers visited several additional nuclear facilities.« less

  19. 76 FR 76153 - Notice of Effectiveness of Exempt Wholesale Generator Status; Caney River Wind Project, LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ...] Notice of Effectiveness of Exempt Wholesale Generator Status; Caney River Wind Project, LLC, Mesquite Solar 1, LLC, Copper Crossing Solar LLC, Copper Mountain Solar 1, LLC, Pinnacle Wind, LLC, Bellevue Solar, LLC, Yamhill Solar, LLC, Osage Wind, LLC, Minco Wind II, LLC Take notice that during the month of...

  20. Workforce Development and Wind for Schools (Poster)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Newcomb, C.; Baring-Gould, I.

    2012-06-01

    As the United States dramatically expands wind energy deployment, the industry is faced with the need to quickly develop a skilled workforce and to address public acceptance. Wind Powering America's Wind for Schools project addresses these challenges. This poster, produced for the American Wind Energy Association's annual WINDPOWER conference, provides an overview of the project, including objectives, methods, and results.

  1. 75 FR 70234 - Notice of Effectiveness of Exempt Wholesale Generator Status

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-17

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Lakefield Wind Project, LLC, EG10-57-000; Constellation Mystic Power, LLC, EG10-58-000; Pattern Gulf Wind, LLC, EG10-59-000; New Harvest Wind Project, LLC, EG10-60-000; Dry Lake Wind Power, II LLC, EG10-61-000; Learning Jupiter Wind Power...

  2. Collected Papers on Wind Turbine Technology

    NASA Technical Reports Server (NTRS)

    Spera, David A. (Editor)

    1995-01-01

    R and D projects on electricity generating wind turbines were conducted at the NASA Lewis Research Center from 1973 to 1988. Most projects were sponsored by the U.S. Department of Energy (DOE), a major element of its Federal Wind Energy Program. Another large wind turbine project was by the Bureau of Reclamation of the U.S. Department of Interior (DOI). From 1988 to 1995, NASA wind energy activities have been directed toward the transfer of technology to commercial and academic organizations. As part of these technology transfer activities, previously unpublished manuscripts have been assembled and presented here to share the wind turbine research results with the wind energy community. A variety of wind turbine technology topics are discussed: Wind and wake models; Airfoil properties; Structural analysis and testing; Control systems; Variable speed generators; and acoustic noise. Experimental and theoretical results are discussed.

  3. Calibration of a Direct Detection Doppler Wind Lidar System using a Wind Tunnel

    NASA Astrophysics Data System (ADS)

    Rees, David

    2012-07-01

    As a critical stage of a Project to develop an airborne Direct-Detection Doppler Wind Lidar System, it was possible to exploit a Wind Tunnel of the VZLU, Prague, Czech Republic for a comprehensive series of tests against calibrated Air Speed generated by the Wind Tunnel. The initial results from these test sequences will be presented. The rms wind speed errors were of order 0.25 m/sec - very satisfactory for this class of Doppler Wind Lidar measurements. The next stage of this Project will exploit a more highly-developed laser and detection system for measurements of wind shear, wake vortex and other potentially hazardous meteorological phenomena at Airports. Following the end of this Project, key parts of the instrumentation will be used for routine ground-based Doppler Wind Lidar measurements of the troposphere and stratosphere.

  4. Fishermen's Energy Atlantic City Wind Farm

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wissemann, Chris

    Fishermen's Energy Atlantic City Wind Farm final report under US DOE Advanced Technology Demonstration project documents achievements developing a demonstration scale offshore wind project off the coast of New Jersey.

  5. Great Lakes O shore Wind Project: Utility and Regional Integration Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sajadi, Amirhossein; Loparo, Kenneth A.; D'Aquila, Robert

    This project aims to identify transmission system upgrades needed to facilitate offshore wind projects as well as operational impacts of offshore generation on operation of the regional transmission system in the Great Lakes region. A simulation model of the US Eastern Interconnection was used as the test system as a case study for investigating the impact of the integration of a 1000MW offshore wind farm operating in Lake Erie into FirstEnergy/PJM service territory. The findings of this research provide recommendations on offshore wind integration scenarios, the locations of points of interconnection, wind profile modeling and simulation, and computational methods tomore » quantify performance, along with operating changes and equipment upgrades needed to mitigate system performance issues introduced by an offshore wind project.« less

  6. Simulator evaluation of manually flown curved instrument approaches. M.S. Thesis

    NASA Technical Reports Server (NTRS)

    Sager, D.

    1973-01-01

    Pilot performance in flying horizontally curved instrument approaches was analyzed by having nine test subjects fly curved approaches in a fixed-base simulator. Approaches were flown without an autopilot and without a flight director. Evaluations were based on deviation measurements made at a number of points along the curved approach path and on subject questionnaires. Results indicate that pilots can fly curved approaches, though less accurately than straight-in approaches; that a moderate wind does not effect curve flying performance; and that there is no performance difference between 60 deg. and 90 deg. turns. A tradeoff of curve path parameters and a paper analysis of wind compensation were also made.

  7. 76 FR 77219 - Federal Energy Regulatory Commission Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings 1 Take notice.... Applicants: Caney River Wind Project, LLC, Rocky Ridge Wind Project, LLC. Description: Joint Application for..., Request for Expedited Consideration and Confidential Treatment of Caney River Wind Project, LLC, et al...

  8. 76 FR 80962 - Notice of Availability of the Record of Decision for the Tule Wind, LLC's Tule Wind Project, San...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ... consist of up to 62 wind turbines (1.5 to 3.0 megawatts (MW) each) with a generating capacity of up to 186..., LVRWB10B3810] Notice of Availability of the Record of Decision for the Tule Wind, LLC's Tule Wind Project, [email protected] . SUPPLEMENTARY INFORMATION: Tule Wind, LLC, a wholly owned subsidiary of Iberdrola Renewables...

  9. Study on optimized decision-making model of offshore wind power projects investment

    NASA Astrophysics Data System (ADS)

    Zhao, Tian; Yang, Shangdong; Gao, Guowei; Ma, Li

    2018-02-01

    China’s offshore wind energy is of great potential and plays an important role in promoting China’s energy structure adjustment. However, the current development of offshore wind power in China is inadequate, and is much less developed than that of onshore wind power. On the basis of considering all kinds of risks faced by offshore wind power development, an optimized model of offshore wind power investment decision is established in this paper by proposing the risk-benefit assessment method. To prove the practicability of this method in improving the selection of wind power projects, python programming is used to simulate the investment analysis of a large number of projects. Therefore, the paper is dedicated to provide decision-making support for the sound development of offshore wind power industry.

  10. Light-Flash Wind-Direction Indicator

    NASA Technical Reports Server (NTRS)

    Zysko, Jan A.

    1993-01-01

    Proposed wind-direction indicator read easily by distant observers. Indicator emits bright flashes of light separated by interval of time proportional to angle between true north and direction from which wind blowing. Timing of flashes indicates direction of wind. Flashes, from high-intensity stroboscopic lights seen by viewers at distances up to 5 miles or more. Also seen more easily through rain and fog. Indicator self-contained, requiring no connections to other equipment. Power demand satisfied by battery or solar power or both. Set up quickly to provide local surface-wind data for aircraft pilots during landing or hovering, for safety officers establishing hazard zones and safety corridors during handling of toxic materials, for foresters and firefighters conducting controlled burns, and for real-time wind observations during any of variety of wind-sensitive operations.

  11. Cockpit simulation study of use of flight path angle for instrument approaches

    NASA Technical Reports Server (NTRS)

    Hanisch, B.; Ernst, H.; Johnston, R.

    1981-01-01

    The results of a piloted simulation experiment to evaluate the effect of integrating flight path angle information into a typical transport electronic attitude director indicator display format for flight director instrument landing system approaches are presented. Three electronic display formats are evaluated during 3 deg straight-in approaches with wind shear and turbulence conditions. Flight path tracking data and pilot subjective comments are analyzed with regard to the pilot's tracking performance and workload for all three display formats.

  12. SPEEDIER Project. Preliminary Report on Social Studies Pilot Projects.

    ERIC Educational Resources Information Center

    Myers, Charles B.; And Others

    This preliminary report describes five social studies pilot programs in the counties of Dauphin, Lancaster, Lebanon, and York, Pennsylvania. It is expected that these pilot endeavors will affect educators in the counties served by SPEEDIER as follows: 1) increase understanding of the newer content, ideas, and strategies in the pilot programs; 2)…

  13. 7 CFR Appendix A to Subpart B of... - Technical Reports for Projects With Total Eligible Project Costs of $200,000 or Less

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... of the wind turbine is 100kW or smaller and with a generator hub height of 120 feet or less. Small... demonstrate the amount of local wind resource where the small wind turbine is to be installed. Indicate the... of the individual wind turbine(s) is larger than 100kW. (a) Qualifications of key project service...

  14. 7 CFR Appendix A to Subpart B of... - Technical Reports for Projects With Total Eligible Project Costs of $200,000 or Less

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... of the wind turbine is 100kW or smaller and with a generator hub height of 120 feet or less. Small... demonstrate the amount of local wind resource where the small wind turbine is to be installed. Indicate the... of the individual wind turbine(s) is larger than 100kW. (a) Qualifications of key project service...

  15. 7 CFR Appendix A to Subpart B of... - Technical Reports for Projects With Total Eligible Project Costs of $200,000 or Less

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... of the wind turbine is 100kW or smaller and with a generator hub height of 120 feet or less. Small... demonstrate the amount of local wind resource where the small wind turbine is to be installed. Indicate the... of the individual wind turbine(s) is larger than 100kW. (a) Qualifications of key project service...

  16. Concentrating Solar Power Projects in Morocco | Concentrating Solar Power |

    Science.gov Websites

    ;alphabetical by project name. You can browse a project profile by clicking on the project name. Airlight Energy Ait-Baha Pilot Plant eCare Solar Thermal Project IRESEN 1 MWe CSP-ORC pilot project ISCC Ain Beni

  17. 77 FR 74865 - Notice of Availability of the Final Environmental Impact Statement for the Searchlight Wind...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-18

    ... Record of Decision. The proposed wind turbines located on the SWE project would be up to 262-feet tall... up to 415 feet. In addition to the wind turbines, the proposed project would require the construction... turbine layout, an 87 wind turbine layout, and a no-action alternative. The 87 wind turbine alternative is...

  18. 47 CFR 74.785 - Low power TV digital data service pilot project.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Low power TV digital data service pilot project... Power TV, TV Translator, and TV Booster Stations § 74.785 Low power TV digital data service pilot project. Low power TV stations authorized pursuant to the LPTV Digital Data Services Act (Public Law 106...

  19. 47 CFR 74.785 - Low power TV digital data service pilot project.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Low power TV digital data service pilot project... Power TV, TV Translator, and TV Booster Stations § 74.785 Low power TV digital data service pilot project. Low power TV stations authorized pursuant to the LPTV Digital Data Services Act (Public Law 106...

  20. Distributed Wind Competitiveness Improvement Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    The Competitiveness Improvement Project (CIP) is a periodic solicitation through the U.S. Department of Energy and its National Renewable Energy Laboratory. The Competitiveness Improvement Project (CIP) is a periodic solicitation through the U.S. Department of Energy and its National Renewable Energy Laboratory. Manufacturers of small and medium wind turbines are awarded cost-shared grants via a competitive process to optimize their designs, develop advanced manufacturing processes, and perform turbine testing. The goals of the CIP are to make wind energy cost competitive with other distributed generation technology and increase the number of wind turbine designs certified to national testing standards. Thismore » fact sheet describes the CIP and funding awarded as part of the project.ufacturers of small and medium wind turbines are awarded cost-shared grants via a competitive process to optimize their designs, develop advanced manufacturing processes, and perform turbine testing. The goals of the CIP are to make wind energy cost competitive with other distributed generation technology and increase the number of wind turbine designs certified to national testing standards. This fact sheet describes the CIP and funding awarded as part of the project.« less

  1. The pointing errors of geosynchronous satellites

    NASA Technical Reports Server (NTRS)

    Sikdar, D. N.; Das, A.

    1971-01-01

    A study of the correlation between cloud motion and wind field was initiated. Cloud heights and displacements were being obtained from a ceilometer and movie pictures, while winds were measured from pilot balloon observations on a near-simultaneous basis. Cloud motion vectors were obtained from time-lapse cloud pictures, using the WINDCO program, for 27, 28 July, 1969, in the Atlantic. The relationship between observed features of cloud clusters and the ambient wind field derived from cloud trajectories on a wide range of space and time scales is discussed.

  2. Wind for Schools (Poster)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baring-Gould, I.

    2010-05-01

    As the United States dramatically expands wind energy deployment, the industry is challenged with developing a skilled workforce and addressing public resistance. Wind Powering America's Wind for Schools project addresses these issues by developing Wind Application Centers (WACs) at universities; WAC students assist in implementing school wind turbines and participate in wind courses, by installing small wind turbines at community "host" schools, by implementing teacher training with interactive curricula at each host school. This poster provides an overview of the first two years of the Wind for Schools project, primarily supporting activities in Colorado, Kansas, Nebraska, South Dakota, Montana, andmore » Idaho.« less

  3. The role of microphysics in the development of mesoscale areas of high winds around occluded cyclones

    NASA Astrophysics Data System (ADS)

    Baker, T. P.; Knippertz, P.; Blyth, A.

    2012-04-01

    Extratropical cyclones are an integral part of the weather in north-western Europe and can be associated with heavy precipitation and strong winds. While synoptic-scale aspects of these storms are often satisfactorily forecast several days in advance, mesoscale features within these systems such as bands of heavy rain or localized wind maxima, which are often the cause of the most damaging effects, are significantly less well understood and predicted by operational forecasts. Accurate predictions of the location, timing and intensity of these features are, however, highly important for the mitigation of the adverse effects that they bring. This is one of the motivations for the UK consortium DIAMET (DIAbatic influences on Mesoscale structures in ExtraTropical storms) that is focused on improving the understanding and predictability of these potentially damaging mesoscale features embedded within larger synoptic-scale extratropical storms. The project is based around a number of field campaigns using the Facility for Airborne Atmospheric Measurements (FAAM) BAe146 research aircraft along with other remote and in-situ measurements. An overview of the project will be presented by Geraint Vaughan in this session. This study analyses the effects of microphysics on the mesoscale dynamics within extratropical storms, in particular the high wind areas around occluded fronts wrapped around the core of a matured cyclonic storm. It has been hypothesized that evaporation and melting of hydrometeors in this region can lead to downward momentum transport and thereby increase near-surface winds (sometimes referred to as sting jets). The main tool for this study is the Weather Research and Forecasting (WRF) model. High-resolution simulations are run for several cases from the DIAMET field campaigns to examine how the development of strong winds around occluded fronts is affected by the microphysics. The model results using different microphysics schemes are compared with the observational data from the BAe146 aircraft and other sources such as wind profilers and radiosondes. In initial model simulations of a secondary frontal wave observed during the 2009 T-NAWDEX pilot flights, the microphysics in the parameterization scheme used has a large impact on the winds observed around the hook of the occlusion. The advanced double-moment Morrison and Thompson schemes show 12-hour mean 10m winds about 50% higher than the simpler WSM3 (WRF single moment) scheme in this area. These results suggest that ice processes could play an important role in the downward transport of momentum in this part of the cyclone. Further results from this and other cases from the field campaigns will be presented at the conference.

  4. The Local Wind Pump for Marginal Societies in Indonesia: A Perspective of Fault Tree Analysis

    NASA Astrophysics Data System (ADS)

    Gunawan, Insan; Taufik, Ahmad

    2007-10-01

    There are many efforts to reduce a cost of investment of well established hybrid wind pump applied to rural areas. A recent study on a local wind pump (LWP) for marginal societies in Indonesia (traditional farmers, peasant and tribes) was one of the efforts reporting a new application area. The objectives of the study were defined to measure reliability value of the LWP due to fluctuated wind intensity, low wind speed, economic point of view regarding a prolong economic crisis occurring and an available local component of the LWP and to sustain economics productivity (agriculture product) of the society. In the study, a fault tree analysis (FTA) was deployed as one of three methods used for assessing the LWP. In this article, the FTA has been thoroughly discussed in order to improve a better performance of the LWP applied in dry land watering system of Mesuji district of Lampung province-Indonesia. In the early stage, all of local component of the LWP was classified in term of its function. There were four groups of the components. Moreover, all of the sub components of each group were subjected to failure modes of the FTA, namely (1) primary failure modes; (2) secondary failure modes and (3) common failure modes. In the data processing stage, an available software package, ITEM was deployed. It was observed that the component indicated obtaining relative a long life duration of operational life cycle in 1,666 hours. Moreover, to enhance high performance the LWP, maintenance schedule, critical sub component suffering from failure and an overhaul priority have been identified in term of quantity values. Throughout a year pilot project, it can be concluded that the LWP is a reliable product to the societies enhancing their economics productivities.

  5. 77 FR 6103 - Combined Notice of Filings #2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-07

    ... Applicants: Prairie Wind Transmission LLC Description: Amended Compliance filing of Prairie Wind Transmission...-4501-003 Applicants: Caney River Wind Project, LLC Description: Notice of Change in Status of Caney River Wind Project, LLC. Filed Date: 1/30/12 Accession Number: 20120130-5322 Comments Due: 5 p.m. ET 2...

  6. 78 FR 61996 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-10

    .../13. Docket Numbers: ER13-2474-000. Applicants: Steele Flats Wind Project, LLC. Description: Steele Flats Wind Project, LLC submits Steele Flats Wind Project, LLC Application for Market-Based Rates to be... Energy Florida, Inc. submits tariff filing per 35.13(a)(2)(iii: OATT Name Change to be effective 7/3/2012...

  7. 76 FR 41238 - Post Rock Wind Power Project, LLC; Supplemental Notice That Initial Market-Based Rate Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER11-3959-000] Post Rock Wind Power Project, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for... Rock Wind Power Project, LLC's application for market-based rate authority, with an accompanying rate...

  8. Project demonstration of wind-turbine electricity: Interconnecting a northern Michigan fruit farm with a major utility

    NASA Astrophysics Data System (ADS)

    Amon, D. M.

    Progress is reviewed in a project to test the economic feasibility of wind turbine technology for generating electricity. The use of wind generating electricity on a commercial fruit farm interconnecting a commercial fruit farm with a major utility to sell power are the find project goals.

  9. 77 FR 33210 - Shooting Star Wind Project, LLC; Supplemental Notice That Initial Market-Based Rate Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER12-1829-000] Shooting Star Wind Project, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for... Shooting Star Wind Project, LLC's application for market-based rate authority, with an accompanying rate...

  10. 77 FR 41397 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-13

    ...; ER10-2504-002; ER12-610-002; ER10-2436-003; ER11-4381-002. Applicants: Fenton Power Partners I, LLC, Wapsipinicon Wind Project, LLC, Shiloh Wind Project 2, LLC, Hoosier Wind Project, LLC, Oasis Power Partners, LLC, Bellevue Solar, LLC, Yamhill Solar, LLC, Chanarambie Power Partners, LLC, LWP Lessee, LLC...

  11. Greenbelt Homes Pilot Program: Summary of Building Envelope Retrofits, Planned HVAC Equipment Upgrades, and Energy Savings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wiehagen, J.; Del Bianco, M.; Mallay, D.

    2015-05-01

    In the fall of 2010, a multiyear pilot energy efficiency retrofit project was undertaken by Greenbelt Homes, Inc, (GHI) a 1,566 home cooperative of circa 1930 and 1940 homes in Greenbelt, Maryland. GHI established this pilot project to serve as a basis for decision making for the rollout of a decade-long community-wide upgrade program that will incorporate energy efficiency improvements to the building envelope and mechanical equipment. It presents a unique opportunity to evaluate and prioritize the wide-range of benefits of high-performance retrofits based on member experience with and acceptance of the retrofit measures implemented during the pilot project. Addressingmore » the complex interactions between benefits, trade-offs, construction methods, project management implications, realistic upfront costs, financing, and other considerations, serves as a case study for energy retrofit projects to include high-performance technologies based on the long-term value to the homeowner. The pilot project focused on identifying the added costs and energy savings benefits of improvements.« less

  12. The Great Plains Wind Power Test Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schroeder, John

    2014-01-30

    This multi-year, multi-faceted project was focused on the continued development of a nationally-recognized facility for the testing, characterization, and improvement of grid-connected wind turbines, integrated wind-water desalination systems, and related educational and outreach topics. The project involved numerous faculty and graduate students from various engineering departments, as well as others from the departments of Geosciences (in particular the Atmospheric Science Group) and Economics. It was organized through the National Wind Institute (NWI), which serves as an intellectual hub for interdisciplinary and transdisciplinary research, commercialization and education related to wind science, wind energy, wind engineering and wind hazard mitigation at Texasmore » Tech University (TTU). Largely executed by an academic based team, the project resulted in approximately 38 peer-reviewed publications, 99 conference presentations, the development/expansion of several experimental facilities, and two provisional patents.« less

  13. Navigating Bioethical Waters: Two Pilot Projects in Problem-Based Learning for Future Bioscience and Biotechnology Professionals.

    PubMed

    Berry, Roberta M; Levine, Aaron D; Kirkman, Robert; Blake, Laura Palucki; Drake, Matthew

    2016-12-01

    We believe that the professional responsibility of bioscience and biotechnology professionals includes a social responsibility to contribute to the resolution of ethically fraught policy problems generated by their work. It follows that educators have a professional responsibility to prepare future professionals to discharge this responsibility. This essay discusses two pilot projects in ethics pedagogy focused on particularly challenging policy problems, which we call "fractious problems". The projects aimed to advance future professionals' acquisition of "fractious problem navigational" skills, a set of skills designed to enable broad and deep understanding of fractious problems and the design of good policy resolutions for them. A secondary objective was to enhance future professionals' motivation to apply these skills to help their communities resolve these problems. The projects employed "problem based learning" courses to advance these learning objectives. A new assessment instrument, "Skills for Science/Engineering Ethics Test" (SkillSET), was designed and administered to measure the success of the courses in doing so. This essay first discusses the rationale for the pilot projects, and then describes the design of the pilot courses and presents the results of our assessment using SkillSET in the first pilot project and the revised SkillSET 2.0 in the second pilot project. The essay concludes with discussion of observations and results.

  14. Dryden Test Pilots 1990 - Smolka, Fullerton, Schneider, Dana, Ishmael, Smith, and McMurtry

    NASA Technical Reports Server (NTRS)

    1990-01-01

    It was a windy afternoon on Rogers Dry Lake as the research pilots of the National Aeronautics and Space Administration's Ames-Dryden Flight Research Facility gathered for a photo shoot. It was a special day too, the 30th anniversary of the first F-104 flight by research pilot Bill Dana. To celebrate, a fly over of Building 4800, in formation, was made with Bill in a Lockheed F-104 (826), Gordon Fullerton in a Northrop T-38, and Jim Smolka in a McDonnell Douglas F/A-18 (841) on March 23, 1990. The F-18 (841), standing on the NASA ramp is a backdrop for the photo of (Left to Right) James W. (Smoke) Smolka, C. Gordon Fullerton, Edward T. (Ed) Schneider, William H. (Bill) Dana, Stephen D. (Steve) Ishmael, Rogers E. Smith, and Thomas C. (Tom) McMurtry. Smolka joined NASA Ames-Dryden Flight Research Facility in September 1985. He has been the project pilot on the F-15 Advanced Control Technology for Integrated Vehicles (ACTIVE) research and F-15 Aeronautical Research Aircraft programs. He has also flown as a pilot on the NASA B-52 launch aircraft, as a co-project pilot on the F-16XL Supersonic Laminar Flow Control aircraft and the F-18 High Angle-of-Attack Research Vehicle (HARV) aircraft. Other aircraft he has flown in research programs are the F-16, F-111, F-104 and the T-38 as support. Fullerton, joined NASA's Ames-Dryden Flight Research Facility in November 1986. He was project pilot on the NASA/Convair 990 aircraft to test space shuttle landing gear components, project pilot on the F-18 Systems Research Aircraft, and project pilot on the B-52 launch aircraft, where he was involved in six air launches of the commercially developed Pegasus space launch vehicle. Other assignments include a variety of flight research and support activities in multi-engine and high performance aircraft such as, F-15, F-111, F-14, X-29, MD-11 and DC-8. Schneider arrived at the NASA Ames-Dryden Flight Research Facility on July 5, 1982, as a Navy Liaison Officer, becoming a NASA research pilot one year later. He has been project pilot for the F-18 High Angle-of-Attack program (HARV), project pilot for the F-15 aeronautical research aircraft, the NASA B-52 launch aircraft, and the SR-71 'Blackbird' aircraft. His past research work at Dryden has included participation in the F-8 Digital Fly-By-Wire, the FAA/NASA 720 Controlled Impact Demonstration, the F-14 Automatic Rudder Interconnect and Laminar Flow programs, and the F-104 Aeronautical Research and Microgravity programs. Dana joined the NASA's High-Speed Flight Station on October 1, 1958. As a research pilot, he was involved in some of the most significant aeronautical programs carried out at the Center. In the late 1960s and in the 1970s Dana was a project pilot on the lifting body program, flying the wingless M2-F1, HL-10, M2-F3, and the X-24B vehicles. He was a project pilot on the hypersonic X-15 research aircraft and flew the rocket-powered vehicle 16 times, reaching a speed of 3,897 mph and an altitude of 310,000 feet. Bill was the pilot on the final (199th) flight of the 10-year program. Other research and support programs Dana participated in were the F-15 Highly Integrated Digital Electronic Control (HIDEC), the F-18 High Angle-of-Attack Research Vehicle (HARV), YF-12, F-104, F-16, PA-30, and T-38. In 1993 Dana became Chief Engineer at NASA's Ames-Dryden Flight Research Facility (soon to be renamed the Dryden Flight Research Center). Ishmael was a research pilot at NASA's Dryden Flight Research Center from January 1977 until the spring of 1995, when he became manager of Dryden's Reusable Launch Vehicle (RLV) programs. In 1996 he became NASA's X-33 Deputy Manager for Flight Test and Operation. As a research pilot he served as the chief project pilot on two major aeronautical research programs, the SR-71 High Speed Research program and the F-16XL Laminar Flow Technology program. He took part in the X-29 Forward-Swept-Wing program, and gave support to other pilots' research flights in a T-38 and F-104 aircraft. Smith became a research pilot at NASA's Ames-Dryden Flight Research Facility in August 1982. In the spring of 1995 he became Chief of the Flight Crew Branch where currently there are 8 other NASA pilots and 2 flight engineers. Smith has also been a co-project pilot on two major aeronautical programs at Dryden. They are the integrated thrust vectoring F-15 ACTIVE and the SR-71 'Blackbird' Research programs. Other research programs that he has been associated with are the F-104 Zero 'G' tests, F-18 HARV, X-29 Forward-Swept-Wing, with support flights being flown in a T-38 and F-104. McMurtry has been a pilot at NASA's Dryden since joining the Flight Research Center in November 1967. In 1981, Tom became Chief Pilot a position he held until February 1986, when he was appointed Chief of the Research Aircraft Operations Division. McMurtry has been project pilot for the AD-1 Oblique Wing program, the F-15 Digital Electronic Engine Control (DEEC) project and the F-8 Supercritical Wing program. He was co- project pilot on the F-15 ACTIVE program, F-8 Digital Fly-By-Wire program and on several remotely piloted research vehicle programs such as the FAA/NASA 720 Controlled Impact Demonstration and the sub-scale F-15 spin research project. He has also been a co-project pilot on the NASA 747 Shuttle Carrier Aircraft.

  15. 76 FR 19355 - Oregon Winds Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14109-000] Oregon Winds..., Motions To Intervene, and Competing Applications On March 11, 2011, Oregon Winds Hydro, LLC filed an... study the feasibility of the Oregon Winds Pumped Storage Project to be located on the John Day River...

  16. 76 FR 76393 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-07

    ...; ER11-4499-002; ER11-4500-002; ER11- 4507-002; ER11-4501-002. Applicants: Smoky Hills Wind Farm, LLC, Smoky Hills Wind Project II, LLC, Enel Stillwater, LLC, Caney River Wind Project, LLC, Canastota Windpower, LLC. Description: Notice of Non-Material Change in Status re Smoky Hills Wind Farm, LLC, et al...

  17. 76 FR 40354 - Notice of Cancellation of Environmental Impact Statement for the Proposed Crowned Ridge Wind...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-08

    ... Environmental Impact Statement for the Proposed Crowned Ridge Wind Energy Center Project, Codington and Grant... to design, construct, operate, and maintain a 150-megawatt Crowned Ridge Wind Energy Center Project... that memorandum, I have terminated the NEPA process for NextEra's proposed Crowned Ridge Wind Energy...

  18. 78 FR 5172 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-24

    .... Applicants: Caney River Wind Project, LLC, Rocky Ridge Wind Project, LLC, Smoky Hills Wind Farm, LLC, Smoky.... Description: Notice of Change in Status of Smokey Hills Wind Farm, LLC, et al. Filed Date: 1/14/13. Accession... Commission received the following exempt wholesale generator filings: Docket Numbers: EG13-11-000. Applicants...

  19. 75 FR 82055 - Commercial Leasing for Wind Power on the Outer Continental Shelf (OCS) Offshore Massachusetts...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-29

    ... No. BOEM-2010-0063] Commercial Leasing for Wind Power on the Outer Continental Shelf (OCS) Offshore..., Interior. ACTION: RFI in Commercial Wind Energy Leasing Offshore Massachusetts, and Invitation for Comments... the construction of a wind energy project(s) on the Outer Continental Shelf (OCS) offshore...

  20. Poleward displacement of coastal upwelling-favorable winds through the 21st century

    NASA Astrophysics Data System (ADS)

    Rykaczewski, R. R.; Dunne, J. P.; Sydeman, W. J.; Garcia-Reyes, M.; Black, B.; Bograd, S. J.

    2016-02-01

    Coastal upwelling is a critical factor influencing the biological production, acidification, and deoxygenation of the ocean's major eastern boundary current ecosystems. A leading conceptual hypothesis projects that the winds that induce coastal upwelling will intensify in response to increased land-sea temperature differences associated with anthropogenic global warming. We examine this hypothesis using an ensemble of coupled, ocean-atmosphere models and find limited evidence for intensification of upwelling-favorable winds or atmospheric pressure gradients in response to increasing land-sea temperature differences. However, our analyses reveal consistent latitudinal and seasonal dependencies of projected changes in wind intensity associated with poleward migration of major atmospheric high-pressure cells. Summertime winds near poleward boundaries of climatological upwelling zones are projected to intensify, while winds near equatorward boundaries are projected to weaken. Developing a better understanding of future changes in upwelling winds is essential to identifying portions of the oceans susceptible to increased hypoxia, ocean acidification, and eutrophication under climate change.

  1. Tools for the trade

    NASA Technical Reports Server (NTRS)

    Gillman, Wallace M.

    1990-01-01

    A brief review is given of daily operations in the airline business, with emphasis on the decisions made by pilots and the information used to make those decisions. Various wind shears are discussed as they affect daily operations. The discussion of tools focuses on airborne reactive and predictive systems. The escape maneuver used to fly out of a severe windshear is from a pilot's point of view.

  2. EMPACT: THE LAS VEGAS INTERAGENCY PILOT PROGRAM

    EPA Science Inventory

    ENPACT: The Las Vegas Interagency Pilot Project

    The Las Vegas Interagency Pilot Project of the EMPACT program has involved eleven efforts. These efforts are described in brief on the poster presentation. They include: Las Vegas Environmental Monitoring Inventory, the Qual...

  3. 78 FR 33101 - Notice of Availability of the Record of Decision for the Alta East Wind Project, Kern County...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-03

    ... turbines, access roads, collector substation, operation and maintenance facility, temporary portable... wind turbines capable of generating up to 153 megawatts. The project site is within the planning....LVRWB11B4520.FX0000] Notice of Availability of the Record of Decision for the Alta East Wind Project, Kern...

  4. Airplane takeoff and landing performance monitoring system

    NASA Technical Reports Server (NTRS)

    Middleton, David B. (Inventor); Srivatsan, Raghavachari (Inventor); Person, Lee H., Jr. (Inventor)

    1994-01-01

    The invention is a real-time takeoff and landing performance monitoring system for an aircraft which provides a pilot with graphic and metric information to assist in decisions related to achieving rotation speed (VR) within the safe zone of a runway, or stopping the aircraft on the runway after landing or take-off abort. The system processes information in two segments: a pretakeoff segment and a real-time segment. One-time inputs of ambient conditions and airplane configuration information are used in the pretakeoff segment to generate scheduled performance data. The real-time segment uses the scheduled performance data, runway length data and transducer measured parameters to monitor the performance of the airplane throughout the takeoff roll. Airplane acceleration and engine-performance anomalies are detected and annunciated. A novel and important feature of this segment is that it updates the estimated runway rolling friction coefficient. Airplane performance predictions also reflect changes in head wind occurring as the takeoff roll progresses. The system provides a head-down display and a head-up display. The head-up display is projected onto a partially reflective transparent surface through which the pilot views the runway. By comparing the present performance of the airplane with a continually predicted nominal performance based upon given conditions, performance deficiencies are detected by the system and conveyed to pilot in form of both elemental information and integrated information.

  5. Airplane takeoff and landing performance monitoring system

    NASA Technical Reports Server (NTRS)

    Middleton, David B. (Inventor); Srivatsan, Raghavachari (Inventor); Person, Jr., Lee H. (Inventor)

    1996-01-01

    The invention is a real-time takeoff and landing performance monitoring system for an aircraft which provides a pilot with graphic and metric information to assist in decisions related to achieving rotation speed (V.sub.R) within the safe zone of a runway, or stopping the aircraft on the runway after landing or take-off abort. The system processes information in two segments: a pretakeoff segment and a real-time segment. One-time inputs of ambient conditions and airplane configuration information are used in the pretakeoff segment to generate scheduled performance data. The real-time segment uses the scheduled performance data, runway length data and transducer measured parameters to monitor the performance of the airplane throughout the takeoff roll. Airplane acceleration and engine-performance anomalies are detected and annunciated. A novel and important feature of this segment is that it updates the estimated runway rolling friction coefficient. Airplane performance predictions also reflect changes in head wind occurring as the takeoff roll progresses. The system provides a head-down display and a head-up display. The head-up display is projected onto a partially reflective transparent surface through which the pilot views the runway. By comparing the present performance of the airplane with a continually predicted nominal performance based upon given conditions, performance deficiencies are detected by the system and conveyed to pilot in form of both elemental information and integrated information.

  6. Best Practices for Wind Energy Development in the Great Lakes Region

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pebbles, Victoria; Hummer, John; Haven, Celia

    2011-07-19

    This report offers a menu of 18 different, yet complementary, preferred practices and policies. The best practices cover all phases of the wind energy development process - from the policies that allow for wind development, to the sustainable operation of a wind project, to the best practices for decommissioning a spent turbine - including applications for offshore wind. Each best practice describes the opportunities and challenges (pros and cons), and offers a case example that illustrates how that best practice is being utilized by a particular jurisdiction or wind project. The practices described in this publication were selected by amore » diverse group of interests from the Great Lakes Wind Collaborative that included environmental groups, industry, academia, and federal, state and local government regulators. The practices were identified through a year-long process that included a literature review, online survey and interviews with individuals from the public, private and non-profit sectors. Optimally, a suite of these best practices would be applied in an appropriate combination to fit the conditions of a particular wind project or a set of wind projects within a given locality or region.« less

  7. An expert system for wind shear avoidance

    NASA Technical Reports Server (NTRS)

    Stengel, Robert F.; Stratton, D. Alexander

    1990-01-01

    The principal objectives are to develop methods for assessing the likelihood of wind shear encounter (based on real-time information in the cockpit), for deciding what flight path to pursue (e.g., takeoff abort, landing go-around, or normal climbout or glide slope), and for using the aircraft's full potential for combating wind shear. This study requires the definition of both deterministic and statistical techniques for fusing internal and external information, for making go/no-go decisions, and for generating commands to the aircraft's autopilot and flight directors for both automatic and manually controlled flight. The expert system for pilot aiding is based on the results of the FAA Windshear Training Aids Program, a two-volume manual that presents an overview, pilot guide, training program, and substantiating data that provides guidelines for this initial development. The Windshear Safety Advisor expert system currently contains over 140 rules and is coded in the LISP programming language for implementation on a Symbolics 3670 LISP Machine.

  8. Wind Advisory System

    NASA Technical Reports Server (NTRS)

    Curto, Paul A. (Inventor); Brown, Gerald E. (Inventor); Zysko, Jan A. (Inventor)

    2001-01-01

    The present invention is a two-part wind advisory system comprising a ground station at an airfield and an airborne unit placed inside an aircraft. The ground station monitors wind conditions (wind speed, wind direction, and wind gust) at the airfield and transmits the wind conditions and an airfield ID to the airborne unit. The airborne unit identifies the airfield by comparing the received airfield ID with airfield IDs stored in a database. The airborne unit also calculates the headwind and crosswind for each runway in both directions at the airfield using the received wind conditions and runway information stored in the database. The airborne unit then determines a recommended runway for takeoff and landing operations of the aircraft based on th runway having the greatest headwind value and displays the airfield ID, wind conditions, and recommended runway to the pilot. Another embodiment of the present invention includes a wireless internet based airborne unit in which the airborne unit can receive the wind conditions from the ground station over the internet.

  9. Oregon department of transportation small business group twice-monthly payments pilot project : summary report.

    DOT National Transportation Integrated Search

    2008-07-01

    Oregon Department of Transportation (ODOT) recently completed a pilot study on small business payment practices. In the study, three pilot projects were tested where payments to small business contractors were changed from a monthly payment to twice-...

  10. The Value of Wind Technology Innovation: Implications for the U.S. Power System, Wind Industry, Electricity Consumers, and Environment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mai, Trieu T; Lantz, Eric J; Mowers, Matthew

    Improvements to wind technologies have, in part, led to substantial deployment of U.S. wind power in recent years. The degree to which technology innovation will continue is highly uncertain adding to uncertainties in future wind deployment. We apply electric sector modeling to estimate the potential wind deployment opportunities across a range of technology advancement projections. The suite of projections considered span a wide range of possible cost and technology innovation trajectories, including those from a recent expert elicitation of wind energy experts, a projection based on the broader literature, and one reflecting estimates based on a U.S. DOE research initiative.more » In addition, we explore how these deployment pathways may impact the electricity system, electricity consumers, the environment, and the wind-related workforce. Overall, our analysis finds that wind technology innovation can have consequential implications for future wind power development throughout the United States, impact the broader electricity system, lower electric system and consumer costs, provide potential environmental benefits, and grow the U.S. wind workforce.« less

  11. Georgia Deaf-Blind Pilot Project: Project EPIC. Final Report. Optional Pilot Projects for Children with Deaf-Blindness.

    ERIC Educational Resources Information Center

    Georgia State Dept. of Education, Atlanta.

    This final report describes activities and accomplishments of Project EPIC (Effective Partner Interaction in the Community), a 3-year federally supported project in Georgia to facilitate the establishment and implementation of effective educational practices with students having deaf-blindness. The project was designed to expand students' present…

  12. Emergency School Aid Act, Pilot Project, 1975-76. Part I and Part II. Research and Evaluation Report, Vol. 10, No. 12.

    ERIC Educational Resources Information Center

    Crawley, Nora; Taylor, Myrtice

    This paper describes and evaluates a pilot project funded under the Emergency School Aid Act (ESAA). The pilot project was subdivided into two parts: the Camp Learning Center program, and the Cultural Adjustment Program. Among the general goals of the Camp Learning Center were to improve mathematics and reading skills through a relevant and…

  13. Wind Technology Modeling Within the System Advisor Model (SAM) (Poster)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Blair, N.; Dobos, A.; Ferguson, T.

    This poster provides detail for implementation and the underlying methodology for modeling wind power generation performance in the National Renewable Energy Laboratory's (NREL's) System Advisor Model (SAM). SAM's wind power model allows users to assess projects involving one or more large or small wind turbines with any of the detailed options for residential, commercial, or utility financing. The model requires information about the wind resource, wind turbine specifications, wind farm layout (if applicable), and costs, and provides analysis to compare the absolute or relative impact of these inputs. SAM is a system performance and economic model designed to facilitate analysismore » and decision-making for project developers, financers, policymakers, and energy researchers. The user pairs a generation technology with a financing option (residential, commercial, or utility) to calculate the cost of energy over the multi-year project period. Specifically, SAM calculates the value of projects which buy and sell power at retail rates for residential and commercial systems, and also for larger-scale projects which operate through a power purchase agreement (PPA) with a utility. The financial model captures complex financing and rate structures, taxes, and incentives.« less

  14. Oregon Department of Transportation greenroads pilot project : US 97 : Lava Butte-S. Century Drive section.

    DOT National Transportation Integrated Search

    2011-02-01

    This project is a Greenroads Pilot Project on the Oregon Department of Transportation (ODOT) project "US 97: Lava Butte S. : Century Drive Section." Greenroads is a sustainability rating system for roadway design and construction (a complete desc...

  15. 76 FR 81927 - Shiloh III Wind Project, LLC; Notice of Petition for Declaratory Order

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL12-15-000] Shiloh III Wind... section 201 of the Federal Power Act, 16 U.S.C. 824, Shiloh III Wind Project, LLC filed a Petition for... over the Owner-Lessor in a structure lease financing transaction for wind powered generation and...

  16. Accident investigation

    NASA Technical Reports Server (NTRS)

    Laynor, William G. Bud

    1987-01-01

    The National Transportation Safety Board (NTSB) has attributed wind shear as a cause or contributing factor in 15 accidents involving transport-categroy airplanes since 1970. Nine of these were nonfatal; but the other six accounted for 440 lives. Five of the fatal accidents and seven of the nonfatal accidents involved encounters with convective downbursts or microbursts. Of other accidents, two which were nonfatal were encounters with a frontal system shear, and one which was fatal was the result of a terrain induced wind shear. These accidents are discussed with reference to helping the aircraft to avoid the wind shear or if impossible to help the pilot to get through the wind shear.

  17. Lake Michigan Offshore Wind Feasibility Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boezaart, Arnold; Edmonson, James; Standridge, Charles

    The purpose of this project was to conduct the first comprehensive offshore wind assessment over Lake Michigan and to advance the body of knowledge needed to support future commercial wind energy development on the Great Lakes. The project involved evaluation and selection of emerging wind measurement technology and the permitting, installation and operation of the first mid-lake wind assessment meteorological (MET) facilities in Michigan’s Great Lakes. In addition, the project provided the first opportunity to deploy and field test floating LIDAR and Laser Wind Sensor (LWS) technology, and important research related equipment key to the sitting and permitting of futuremore » offshore wind energy development in accordance with public participation guidelines established by the Michigan Great Lakes Wind Council (GLOW). The project created opportunities for public dialogue and community education about offshore wind resource management and continued the dialogue to foster Great Lake wind resource utilization consistent with the focus of the GLOW Council. The technology proved to be effective, affordable, mobile, and the methods of data measurement accurate. The public benefited from a substantial increase in knowledge of the wind resources over Lake Michigan and gained insights about the potential environmental impacts of offshore wind turbine placements in the future. The unique first ever hub height wind resource assessment using LWS technology over water and development of related research data along with the permitting, sitting, and deployment of the WindSentinel MET buoy has captured public attention and has helped to increase awareness of the potential of future offshore wind energy development on the Great Lakes. Specifically, this project supported the acquisition and operation of a WindSentinel (WS) MET wind assessment buoy, and associated research for 549 days over multiple years at three locations on Lake Michigan. Four research objectives were defined for the project including to: 1) test and validate floating LIDAR technology; 2) collect and access offshore wind data; 3) detect and measure bird and bat activity over Lake Michigan; 4) conduct an over water sound propagation study; 5) prepare and offer a college course on offshore energy, and; 6) collect other environmental, bathometric, and atmospheric data. Desk-top research was performed to select anchorage sites and to secure permits to deploy the buoy. The project also collected and analyzed data essential to wind industry investment decision-making including: deploying highly mobile floating equipment to gather offshore wind data; correlating offshore wind data with conventional on-shore MET tower data; and performing studies that can contribute to the advancement and deployment of offshore wind technologies. Related activities included: • Siting, permitting, and deploying an offshore floating MET facility; • Validating the accuracy of floating LWS using near shoreline cup anemometer MET instruments; • Assessment of laser pulse technology (LIDAR) capability to establish hub height measurement of wind conditions at multiple locations on Lake Michigan; • Utilizing an extended-season (9-10 month) strategy to collect hub height wind data and weather conditions on Lake Michigan; • Investigation of technology best suited for wireless data transmission from distant offshore structures; • Conducting field-validated sound propagation study for a hypothetical offshore wind farm from shoreline locations; • Identifying the presence or absence of bird and bat species near wind assessment facilities; • Identifying the presence or absence of benthic and pelagic species near wind assessment facilities; All proposed project activities were completed with the following major findings: • Floating Laser Wind Sensors are capable of high quality measurement and recordings of wind resources. The WindSentinel presented no significant operational or statistical limitations in recording wind data technology at a at a high confidence level as compared to traditional anemometer cup technology. • During storms, mean Turbulent Kinetic Energy (TKE) increases with height above water; • Sufficient wind resources exist over Lake Michigan to generate 7,684 kWh of power using a 850 kW rated turbine at elevations between 90 - 125 meters, a height lower than originally anticipated for optimum power generation; • Based on initial assessments, wind characteristics are not significantly different at distant (thirty-two mile) offshore locations as compared to near-shore (six mile) locations; • Significant cost savings can be achieved in generation wind energy at lower turbine heights and locating closer to shore. • Siting must be sufficiently distant from shore to minimize visual impact and to address public sentiment about offshore wind development; • Project results show that birds and bats do frequent the middle of Lake Michigan, bats more so than birds; • Based on the wind resource assessment and depths of Lake Michigan encountered during the project, future turbine placement will most likely need to incorporate floating or anchored technology; • The most appropriate siting of offshore wind energy locations will enable direct routing of transmission cables to existing generating and transmission facilities located along the Michigan shoreline; • Wind turbine noise propagation from a wind energy generating facility at a five mile offshore location will not be audible at the shoreline over normal background sound levels.« less

  18. Renewable energy projects in the Dominican Republic

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Viani, B.

    1997-12-01

    This paper describes a US/Dominican Republic program to develop renewable energy projects in the country. The objective is to demonstrate the commercial viability of renewable energy generation projects, primarily small-scale wind and hydropower. Preliminary studies are completed for three micro-hydro projects with a total capacity of 262 kWe, and two small wind power projects for water pumping. In addition wind resource assessment is ongoing, and professional training and technical assistance to potential investors is ongoing. Projects goals include not less than ten small firms actively involved in installation of such systems by September 1998.

  19. Proposed OTEC Punta Tuna Pilot Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Marina, J.; Perez, F.

    1981-01-01

    Siting features and the design of a 40 MWe prototype OTEC for installation at Punta Tuna, Puerto Rico are presented. An annual average temperature gradient of 40 F from surface to 3,000 ft depth, a sharp coastal drop-off, projected benign environmental effects, and expensive indigenous power supplies are seen as favorable for fixed, floating, or grazing OTEC plants. The Punta Tuna design is for a platform fitted with generators in 300 ft of water, submarine cable power transmission, fiberglass seawater pipes, NH3 as a working fluid, and heat exchangers at the 300 ft depth, below hurricane wind and wave action.more » Methods of installing the 3,000 ft cold water pipes are discussed, and the use of OTEC derived electricity for aluminum smelting in the Caribbean is indicated.« less

  20. Wind energy education projects. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ziegler, P.; Conlon, T.R.; Arcadi, T.

    Two projects under DOE's Small-Scale Appropriate Energy Technology Grants Program have educated the public in a hands on way about wind energy systems. The first was awarded to Peter Ziegler of Berkeley, California, to design and build a walk-through exhibition structure powered by an adjoining wind-generator. This Wind Energy Pavilion was erected at Fort Funston in the Golden Gate National Recreation Area. It currently serves both as an enclosure for batteries and a variety of monitoring instruments, and as a graphic environment where the public can learn about wind energy. The second project, entitled Wind and Kid Power, involved anmore » educational program for a classroom of first through third grades in the Vallejo, Unified School District. The students studied weather, measured wind speeds and built small models of wind machines. They also built a weather station, and learned to use weather instruments. The grant funds enabled them to actually build and erect a Savonius wind machine at the Loma Vista Farm School.« less

  1. Model-Based Systems Engineering Pilot Program at NASA Langley

    NASA Technical Reports Server (NTRS)

    Vipavetz, Kevin G.; Murphy, Douglas G.; Infeld, Samatha I.

    2012-01-01

    NASA Langley Research Center conducted a pilot program to evaluate the benefits of using a Model-Based Systems Engineering (MBSE) approach during the early phase of the Materials International Space Station Experiment-X (MISSE-X) project. The goal of the pilot was to leverage MBSE tools and methods, including the Systems Modeling Language (SysML), to understand the net gain of utilizing this approach on a moderate size flight project. The System Requirements Review (SRR) success criteria were used to guide the work products desired from the pilot. This paper discusses the pilot project implementation, provides SysML model examples, identifies lessons learned, and describes plans for further use on MBSE on MISSE-X.

  2. Wind and Solar Data Projections from the U.S. Energy Information Administration: Past Performance and Planned Enhancements

    EIA Publications

    2016-01-01

    In an effort to improve EIA's approach to providing accurate, comprehensive data, and useful projections for policy analysis, EIA has conducted a review of its historical data and projections of capacity, generation, and cost projections for wind and solar technologies. While EIA's internal processes and engagement with stakeholders are both continuing, this paper shares some early findings of EIA's current review of our wind and solar data and projections, focusing in part on some of the issues that have been publicly raised by EIA's critics.

  3. Potential of wind power projects under the Clean Development Mechanism in India

    PubMed Central

    Purohit, Pallav; Michaelowa, Axel

    2007-01-01

    Background So far, the cumulative installed capacity of wind power projects in India is far below their gross potential (≤ 15%) despite very high level of policy support, tax benefits, long term financing schemes etc., for more than 10 years etc. One of the major barriers is the high costs of investments in these systems. The Clean Development Mechanism (CDM) of the Kyoto Protocol provides industrialized countries with an incentive to invest in emission reduction projects in developing countries to achieve a reduction in CO2 emissions at lowest cost that also promotes sustainable development in the host country. Wind power projects could be of interest under the CDM because they directly displace greenhouse gas emissions while contributing to sustainable rural development, if developed correctly. Results Our estimates indicate that there is a vast theoretical potential of CO2 mitigation by the use of wind energy in India. The annual potential Certified Emissions Reductions (CERs) of wind power projects in India could theoretically reach 86 million. Under more realistic assumptions about diffusion of wind power projects based on past experiences with the government-run programmes, annual CER volumes by 2012 could reach 41 to 67 million and 78 to 83 million by 2020. Conclusion The projections based on the past diffusion trend indicate that in India, even with highly favorable assumptions, the dissemination of wind power projects is not likely to reach its maximum estimated potential in another 15 years. CDM could help to achieve the maximum utilization potential more rapidly as compared to the current diffusion trend if supportive policies are introduced. PMID:17663772

  4. A century of wind tunnels since Eiffel

    NASA Astrophysics Data System (ADS)

    Chanetz, Bruno

    2017-08-01

    Fly higher, faster, preserve the life of test pilots and passengers, many challenges faced by man since the dawn of the twentieth century, with aviation pioneers. Contemporary of the first aerial exploits, wind tunnels, artificially recreating conditions encountered during the flight, have powerfully contributed to the progress of aeronautics. But the use of wind tunnels is not limited to aviation. The research for better performance, coupled with concern for energy saving, encourages manufacturers of ground vehicles to perform aerodynamic tests. Buildings and bridge structures are also concerned. This article deals principally with the wind tunnels built at ONERA during the last century. Somme wind tunnels outside ONERA, even outside France, are also evocated when their characteristics do not exist at ONERA.

  5. The WindStar project

    NASA Astrophysics Data System (ADS)

    McCandless, Samuel W.; Jones, W. Linwood; Huxtable, Barton D.; Jones, Lawrence P.

    1996-03-01

    The ``WindStar'' project is a cooperative, cost-sharing venture between NASA's Earth Observations Commercial Applications Program (EOCAP), directed by the Stennis Space Center (SSC), and User Systems, Incorporated (USI), a Virginia-based remote sensing technology development company. The project seeks to establish the commercial viability of using twice-a-day satellite scatterometer data to produce marine wind forecasts for commercial television weather broadcasts. The WindStar product will be an animated, two dimensional map of wind speed and direction that evolves in time from the observed ``nowcast'' every 12 hours to a projected ``forecast''. Commercial television stations in coastal areas will incorporate this video into the weather segment of their news broadcasts to advise viewers, with both commercial and recreational interests, of coastal and off-shore conditions. While contributing to improved near shore marine operations for both recreational and commercial boaters, the proposed product would also be of use to commercial fishermen, coastal shipping operations, search and rescue operations, state and local governments, the Coast Guard, and the Navy. Projected new business plans include establishing and maintaining a ``Global Wind History'' archive that can be accessed on Internet.

  6. The evolution of Wisconsin's urban FIA program—yesterday today and tomorrow

    Treesearch

    Andrew M. Stoltman; Richard B. Rideout

    2015-01-01

    In 2002, Wisconsin was part of two pilot projects in cooperation with the US Forest Service. The first was a street tree assessment, and the second was an urban FIA project. The data generated by these pilots changed the way that Wisconsin DNRs’ Urban Forestry Program conducts its business. Although there have been several urban FIA pilot projects throughout the U.S.,...

  7. Feasibility study of wind-generated electricity for rural applications in southwestern Ohio

    NASA Astrophysics Data System (ADS)

    Kohring, G. W.

    The parameters associated with domestic production of wind generated electricity for direct use by small farms and rural homes in the southwestern Ohio region are discussed. The project involves direct utility interfaced electricity generation from a horizontal axis, down-wind, fixed pitch, wind powered induction generator system. Goals of the project are to determine: the ability to produce useful amounts of domestic wind generated electricity in the southwestern Ohio region; economic justification for domestic wind generated electrical production; and the potential of domestic wind generated electricity for reducing dependence on non-renewable energy resources in the southwestern Ohio region.

  8. Development of a quiet supersonic wind tunnel with a cryogenic adaptive nozzle

    NASA Technical Reports Server (NTRS)

    Wolf, Stephen D.

    1991-01-01

    The main objectives of this work is to demonstrate the potential of a cryogenic adaptive nozzle to generate quiet (low disturbance) supersonic flow. A drive system was researched for the Fluid Mechanics Laboratory (FML) Laminar Flow Supersonic Wind Tunnel (LFSWT) using a pilot tunnel. A supportive effort for ongoing Proof of Concept (PoC) research leading to the design of critical components of the LFSWT was maintained. The state-of-the-art in quiet supersonic wind tunnel design was investigated. A supersonic research capability was developed within the FML.

  9. Airspace Technology Demonstration 2 (ATD-2): ATD-2 CLT Pilot Community Engagement

    NASA Technical Reports Server (NTRS)

    Capps, Al; Hooey, Becky

    2017-01-01

    The Airspace Technology Demonstration 2 (ATD-2) project conducted a pilot community workshop at Charlotte Douglas International Airport (CLT) in Charlotte, North Carolina. The goal was to familiarize pilots with the ATD-2 project, with an emphasis on procedures that may affect pilots during the Phase 1 Field Demonstration (beginning September 30, 2017). At this workshop, the high-level goals and objectives of ATD-2, expected benefits for pilots, changes to procedures, training requirements, and data sharing elements were presented.

  10. 7 CFR 1468.4 - Establishing Conservation Farm Option (CFO) pilot project areas.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Establishing Conservation Farm Option (CFO) pilot...) COMMODITY CREDIT CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS CONSERVATION FARM OPTION General Provisions § 1468.4 Establishing Conservation Farm Option (CFO) pilot project areas...

  11. Regional downscaling of temporal resolution in near-surface wind from statistically downscaled Global Climate Models (GCMs) for use in San Francisco Bay coastal flood modeling

    NASA Astrophysics Data System (ADS)

    O'Neill, A.; Erikson, L. H.; Barnard, P.

    2013-12-01

    While Global Climate Models (GCMs) provide useful projections of near-surface wind vectors into the 21st century, resolution is not sufficient enough for use in regional wave modeling. Statistically downscaled GCM projections from Multivariate Adaptive Constructed Analogues (MACA) provide daily near-surface winds at an appropriate spatial resolution for wave modeling within San Francisco Bay. Using 30 years (1975-2004) of climatological data from four representative stations around San Francisco Bay, a library of example daily wind conditions for four corresponding over-water sub-regions is constructed. Empirical cumulative distribution functions (ECDFs) of station conditions are compared to MACA GFDL hindcasts to create correction factors, which are then applied to 21st century MACA wind projections. For each projection day, a best match example is identified via least squares error among all stations from the library. The best match's daily variation in velocity components (u/v) is used as an analogue of representative wind variation and is applied at 3-hour increments about the corresponding sub-region's projected u/v values. High temporal resolution reconstructions using this methodology on hindcast MACA fields from 1975-2004 accurately recreate extreme wind values within the San Francisco Bay, and because these extremes in wind forcing are of key importance in wave and subsequent coastal flood modeling, this represents a valuable method of generating near-surface wind vectors for use in coastal flood modeling.

  12. Distributed Wind Soft Costs: A Beginning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jimenez, Tony; Forsyth,Trudy; Preus, Robert

    2016-06-14

    Tony Jimenez presented this overview of distributed wind soft costs at the 2016 Small Wind Conference in Stevens Point, Wisconsin, on June 14, 2016. Soft costs are any non-hardware project costs, such as costs related to permitting fees, installer/developer profit, taxes, transaction costs, permitting, installation, indirect corporate costs, installation labor, and supply chain costs. This presentation provides an overview of soft costs, a distributed wind project taxonomy (of which soft costs are a subset), an alpha data set project demographics, data summary, and future work in this area.

  13. Distributed Wind Competitiveness Improvement Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    2016-05-01

    The Competitiveness Improvement Project (CIP) is a periodic solicitation through the U.S. Department of Energy and its National Renewable Energy Laboratory. Manufacturers of small and medium wind turbines are awarded cost-shared grants via a competitive process to optimize their designs, develop advanced manufacturing processes, and perform turbine testing. The goals of the CIP are to make wind energy cost competitive with other distributed generation technology and increase the number of wind turbine designs certified to national testing standards. This fact sheet describes the CIP and funding awarded as part of the project.

  14. 76 FR 69279 - Notice of Intent to Prepare an Environmental Impact Statement for the Quaking Aspen Wind Energy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-08

    ... to 100 1.5 megawatt (MW) to 3 MW wind turbine generators with a nameplate capacity of 250 MW of power... Intent to Prepare an Environmental Impact Statement for the Quaking Aspen Wind Energy Project, Wyoming... Statement (EIS) for the Quaking Aspen Wind Energy Project (Quaking Aspen). By this notice, BLM is: (1...

  15. 75 FR 43551 - Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Mohave County Wind...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-26

    ... Dam. The project will consist of up to 335 wind turbine generators (WTGs). Construction may consist of... County Wind Farm Project, Mohave County, AZ AGENCY: Bureau of Land Management, Interior. ACTION: Notice....gov/az/st/en/prog/energy/wind/mohave.html . In order to be included in the Draft EIS, all comments...

  16. Blowing in the wind: evaluating wind energy projects on the national forests

    Treesearch

    Kerry Schlichting; Evan Mercer

    2011-01-01

    The 650 million ac of federal lands are facing increased scrutiny for wind energy development. As a result, the US Forest Service has been directed to develop policies and procedures for siting wind energy projects. We incorporate geospatial site suitability analysis with applicable policy and management principles to illustrate the use of a Spatial Decision Support...

  17. Modeling and analyzing traffic safety perceptions: An application to the speed limit reduction pilot project in Edmonton, Alberta.

    PubMed

    El-Basyouny, Karim; El-Bassiouni, Mohamed Yahia

    2013-03-01

    To address the speeding problem in residential areas, the City of Edmonton initiated a pilot project to reduce the posted speed limit from 50km/h to 40km/h within six residential communities. This paper investigates the community perceptions of traffic safety within the six pilot communities in two phases: prior to project initiation (pre-pilot) and following the end of the project (post-pilot). This objective was accomplished by analyzing the results of two random dialing telephone surveys comprising 300 residents each. A preliminary analysis showed compatible demographic configurations for the two samples and confirmed that the residents were aware of both the posted speed limits and the adopted speed management controls. For the confirmatory factor analysis (CFA), a two-group (pre-pilot and post-pilot) three-factor model was used to assess the residents' perceptions of the speeding behavior (Speeding), their concerns about traffic safety issues (Concerns), and their perceptions of traffic safety (Safety). Comparing the CFA results of the post-pilot survey versus those of the pre-pilot survey, it was evident that there was a significant decrease in Speeding and Concerns accompanied by a significant increase in Safety. A structural equations model (SEM) was also fitted to the data in order to assess the impact of Speeding and Concerns on Safety. The results showed that Concerns increase significantly with Speeding, and that both factors have significant negative impacts on Safety. However, while the impact of Concerns on Safety was direct, that of Speeding on Safety was largely indirect (i.e., mediated through Concerns). Overall, the multivariate analysis has demonstrated that the pilot project was successful in improving the residents' perceptions of traffic safety in their community. Crown Copyright © 2012. Published by Elsevier Ltd. All rights reserved.

  18. John Glenn Prepares for a Test in the Multi-Axis Space Test Inertia Facility

    NASA Image and Video Library

    1960-02-21

    Mercury astronaut John Glenn prepares for a test in the Multi-Axis Space Test Inertia Facility (MASTIF) inside the Altitude Wind Tunnel at the National Aeronautics and Space Administration (NASA) Lewis Research Center. The MASTIF was a three-axis test rig with a pilot’s chair mounted in the center. The device was designed to train Project Mercury pilots to bring a spinning spacecraft under control. An astronaut was secured in a foam couch in the center of the rig. The rig was then spun on three axes from 2 to 50 rotations per minute. Small nitrogen gas thrusters were used by the astronauts to bring the MASTIF under control. In February and March 1960, the seven Project Mercury astronauts traveled to Cleveland to train on the MASTIF. Warren North and a team of air force physicians were on hand to monitor their health. After being briefed by Lewis pilot Joe Algranti and researcher James Useller, the rider would climb into the rig and be secured in the chair, as seen in this photograph. A Lewis engineer would then slowly set the MASTIF in motion. It was the astronaut’s job to bring it under control. Each individual was required to accumulate 4.5 to 5 hours of MASTIF time. Glenn became the first American to orbit the earth on February 20, 1962 in the Friendship 7 Mercury capsule. In March 1999, the Lewis Research Center was renamed the John H. Glenn Research Center at Lewis Field.

  19. Establishment of a National Wind Energy Center at University of Houston

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wang, Su Su

    The DOE-supported project objectives are to: establish a national wind energy center (NWEC) at University of Houston and conduct research to address critical science and engineering issues for the development of future large MW-scale wind energy production systems, especially offshore wind turbines. The goals of the project are to: (1) establish a sound scientific/technical knowledge base of solutions to critical science and engineering issues for developing future MW-scale large wind energy production systems, (2) develop a state-of-the-art wind rotor blade research facility at the University of Houston, and (3) through multi-disciplinary research, introducing technology innovations on advanced wind-turbine materials, processing/manufacturingmore » technology, design and simulation, testing and reliability assessment methods related to future wind turbine systems for cost-effective production of offshore wind energy. To achieve the goals of the project, the following technical tasks were planned and executed during the period from April 15, 2010 to October 31, 2014 at the University of Houston: (1) Basic research on large offshore wind turbine systems (2) Applied research on innovative wind turbine rotors for large offshore wind energy systems (3) Integration of offshore wind-turbine design, advanced materials and manufacturing technologies (4) Integrity and reliability of large offshore wind turbine blades and scaled model testing (5) Education and training of graduate and undergraduate students and post- doctoral researchers (6) Development of a national offshore wind turbine blade research facility The research program addresses both basic science and engineering of current and future large wind turbine systems, especially offshore wind turbines, for MW-scale power generation. The results of the research advance current understanding of many important scientific issues and provide technical information for solving future large wind turbines with advanced design, composite materials, integrated manufacturing, and structural reliability and integrity. The educational program have trained many graduate and undergraduate students and post-doctoral level researchers to learn critical science and engineering of wind energy production systems through graduate-level courses and research, and participating in various projects in center’s large multi-disciplinary research. These students and researchers are now employed by the wind industry, national labs and universities to support the US and international wind energy industry. The national offshore wind turbine blade research facility developed in the project has been used to support the technical and training tasks planned in the program to accomplish their goals, and it is a national asset which is available for used by domestic and international researchers in the wind energy arena.« less

  20. Renewable Energy for Rural Economic Development

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hartman, Cathy L.; Stafford, Edwin R.

    When Renewable Energy for Rural Economic Development (RERED) began in 2005, Utah had no commercial wind power projects in operation. Today, the state hosts two commercial wind power plants, the Spanish Fork Wind Project and the Milford Wind Corridor Project, totaling 324 megawatts (MW) of wind capacity. Another project in San Juan County is expected to break ground very soon, and two others, also in San Juan County, are in the approval process. RERED has played a direct role in advancing wind power (and other renewable energy and clean technology innovations) in Utah through its education outreach and research/publication initiatives.more » RERED has also witnessed and studied some of the persistent barriers facing wind power development in communities across Utah and the West, and its research expanded to examine the diffusion of other energy efficiency and clean technology innovations. RERED leaves a legacy of publications, government reports, and documentary films and educational videos (archived at www.cleantech.usu.edu) to provide important insights for entrepreneurs, policymakers, students, and citizens about the road ahead for transitioning society onto a cleaner, more sustainable future.« less

  1. Plans and status of the NASA-Lewis Research Center wind energy project

    NASA Technical Reports Server (NTRS)

    Thomas, R.; Puthoff, R.; Savino, J.; Johnson, W.

    1975-01-01

    This report describes that portion of the national five-year wind energy program that is being managed by the NASA-Lewis Research Center for the ERDA. The Lewis Research Center's Wind Power Office, its organization and plans and status are briefly described. The three major elements of the wind energy project at Lewis are the experimental 100 kW wind-turbine generator; the first generation industry-built and user-operated wind turbine generators; and the supporting research and technology tasks which are each briefly described.

  2. Basic Wind Tech Course - Lesson Plans and Activities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Swapp, Andy

    2011-07-01

    The funds from this project were used to purchase tools and instrumentation to help replicate actual on-the-job wind energy scenarios which provided the students with the practical or applied components of wind energy jobs. This project enhanced the educational experiences provided for the students in terms of engineering and science components of wind energy by using electronics, control systems, and electro-mechanical instrumentation to help students learn standardized wind-specific craftsman skills. In addition the tools and instrumentation helped the students learn the safety necessary to work in the wind industry.

  3. CSC Tip Sheets: Conducting and Evaluating Pilot Projects

    EPA Pesticide Factsheets

    Learn how to conduct and evaluate pilot projects, which are opportunities to “test the waters” for your project on a small scale, provide insight and data on what works, and adjust your strategy for full-scale implementation.

  4. Downscaling wind and wavefields for 21st century coastal flood hazard projections in a region of complex terrain

    USGS Publications Warehouse

    O'Neill, Andrea; Erikson, Li; Barnard, Patrick

    2017-01-01

    While global climate models (GCMs) provide useful projections of near-surface wind vectors into the 21st century, resolution is not sufficient enough for use in regional wave modeling. Statistically downscaled GCM projections from Multivariate Adaptive Constructed Analogues provide daily averaged near-surface winds at an appropriate spatial resolution for wave modeling within the orographically complex region of San Francisco Bay, but greater resolution in time is needed to capture the peak of storm events. Short-duration high wind speeds, on the order of hours, are usually excluded in statistically downscaled climate models and are of key importance in wave and subsequent coastal flood modeling. Here we present a temporal downscaling approach, similar to constructed analogues, for near-surface winds suitable for use in local wave models and evaluate changes in wind and wave conditions for the 21st century. Reconstructed hindcast winds (1975–2004) recreate important extreme wind values within San Francisco Bay. A computationally efficient method for simulating wave heights over long time periods was used to screen for extreme events. Wave hindcasts show resultant maximum wave heights of 2.2 m possible within the Bay. Changes in extreme over-water wind speeds suggest contrasting trends within the different regions of San Francisco Bay, but 21th century projections show little change in the overall magnitude of extreme winds and locally generated waves.

  5. 77 FR 10599 - Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-22

    ...] Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report AGENCY: Federal Highway... participating in the Pilot Program, 23 U.S.C. 327(g) mandates semiannual audits during each of the first 2 years of State participation and annual audits during each subsequent year of State participation. This...

  6. The Pilot Staffing Conundrum: A Delphi Study

    DTIC Science & Technology

    2009-06-01

    Project, AFIT/ GMO /LAL/98J-2. School of Logistics and Acquisition Management, Air Force Institute of Technology (AU), Wright Patterson AFB, OH, June...Kafer, John H. Relationship of Airline Pilot Demand and Air Force Pilot Retention. Graduate Research Project, AFIT/ GMO /LAL/98J-11. School of Logistics

  7. 76 FR 63988 - Pilot Project on NAFTA Trucking Provisions; Pre-Authorization Safety Audits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-14

    ...-0097] Pilot Project on NAFTA Trucking Provisions; Pre-Authorization Safety Audits AGENCY: Federal Motor... public comment on data and information concerning the Pre-Authorization Safety Audits (PASAs) for two motor carriers that applied to participate in the Agency's long-haul pilot program to test and...

  8. 78 FR 36764 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-19

    .... Applicants: Chisholm View Wind Project, LLC. Description: Amendment to Application for Authorization Under Section 203 of the Federal Power Act of Chisholm View Wind Project, LLC. Filed Date: 6/6/13. Accession... Rose Wind, LLC, Prairie Rose Transmission, LLC. Description: Amendment to Joint Application for...

  9. In Brief: Impacts of wind energy assessed

    NASA Astrophysics Data System (ADS)

    Zielinski, Sarah

    2007-05-01

    By 2020, greater use of wind energy could reduce carbon dioxide emissions by the U.S. energy sector by about 4.5%. However, greater effort is needed to address potentially negative impacts of this growing energy source, according to a new report from a committee of the U.S. National Research Council. Potential impacts of wind energy projects include deaths of birds and bats, reduced value of property located near a turbine, and habitat loss and fragmentation. However, because these are generally local projects, there is little information available to determine the cumulative effects of wind turbines over a whole region. The report makes several recommendations on how to improve regulation at the local, state, and federal levels. The report also sets out a guide for evaluating wind-energy projects, which includes questions about potential environmental, economic, cultural, and aesthetic impacts. The report, ``Environmental Impacts of Wind-Energy Projects,'' is available at http://books.nap.edu/catalog.php?record_id=11935

  10. Western Wind Strategy: Addressing Critical Issues for Wind Deployment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Douglas Larson; Thomas Carr

    2012-03-30

    The goal of the Western Wind Strategy project was to help remove critical barriers to wind development in the Western Interconnection. The four stated objectives of this project were to: (1) identify the barriers, particularly barriers to the operational integration of renewables and barriers identified by load-serving entities (LSEs) that will be buying wind generation, (2) communicate the barriers to state officials, (3) create a collaborative process to address those barriers with the Western states, utilities and the renewable industry, and (4) provide a role model for other regions. The project has been on the forefront of identifying and informingmore » state policy makers and utility regulators of critical issues related to wind energy and the integration of variable generation. The project has been a critical component in the efforts of states to push forward important reforms and innovations that will enable states to meet their renewable energy goals and lower the cost to consumers of integrating variable generation.« less

  11. Study on the Selection of Equipment Suppliers for Wind Power Generation EPC Project

    NASA Astrophysics Data System (ADS)

    Yang, Yuanyue; Li, Huimin

    2017-12-01

    In the EPC project, the purchase cost of equipments accounted for about 60% of the total project cost, thus, the selection of equipment suppliers has an important influence on the EPC project. This paper, took EPC project for the phase I engineering of Guizhou Huaxi Yunding wind power plant as research background, constructed the evaluation index system for the selection of equipment suppliers for wind power generation EPC project from multiple perspectives, and introduced matter-element extension evaluation model to evaluate the selection of equipment suppliers for this project from the qualitative and quantitative point of view. The result is consistent with the actual situation, which verifies the validity and operability of this method.

  12. Modeling of UH-60A Hub Accelerations with Neural Networks

    NASA Technical Reports Server (NTRS)

    Kottapalli, Sesi

    2002-01-01

    Neural network relationships between the full-scale, flight test hub accelerations and the corresponding three N/rev pilot floor vibration components (vertical, lateral, and longitudinal) are studied. The present quantitative effort on the UH-60A Black Hawk hub accelerations considers the lateral and longitudinal vibrations. An earlier study had considered the vertical vibration. The NASA/Army UH-60A Airloads Program flight test database is used. A physics based "maneuver-effect-factor (MEF)", derived using the roll-angle and the pitch-rate, is used. Fundamentally, the lateral vibration data show high vibration levels (up to 0.3 g's) at low airspeeds (for example, during landing flares) and at high airspeeds (for example, during turns). The results show that the advance ratio and the gross weight together can predict the vertical and the longitudinal vibration. However, the advance ratio and the gross weight together cannot predict the lateral vibration. The hub accelerations and the advance ratio can be used to satisfactorily predict the vertical, lateral, and longitudinal vibration. The present study shows that neural network based representations of all three UH-60A pilot floor vibration components (vertical, lateral, and longitudinal) can be obtained using the hub accelerations along with the gross weight and the advance ratio. The hub accelerations are clearly a factor in determining the pilot vibration. The present conclusions potentially allow for the identification of neural network relationships between the experimental hub accelerations obtained from wind tunnel testing and the experimental pilot vibration data obtained from flight testing. A successful establishment of the above neural network based link between the wind tunnel hub accelerations and the flight test vibration data can increase the value of wind tunnel testing.

  13. A theoretical analysis of airplane longitudinal stability and control as affected by wind shear

    NASA Technical Reports Server (NTRS)

    Sherman, W. L.

    1977-01-01

    The longitudinal equations of motion with wind shear terms were used to analyze the stability and motions of a jet transport. A positive wind shear gives a decreasing head wind or changes a head wind into a tail wind. A negative wind shear gives a decreasing tail wind or changes a tail wind into a head wind. It was found that wind shear had very little effect on the short period mode and that negative wind shear, although it affected the phugoid, did not cause stability problems. On the other hand, it was found that positive wind shear can cause the phugoid to become aperiodic and unstable. In this case, a stability boundary for the phugoid was found that is valid for most aircraft at all flight speeds. Calculations of aircraft motions confirmed the results of the stability analysis. It was found that a flight path control automatic pilot and an airspeed control system provide good control in all types of wind shear. Appendixes give equations of motion that include the effects of downdrafts and updrafts and extend the longitudinal equations of motion for shear to six degrees of freedom.

  14. 33 CFR 385.30 - Master Implementation Sequencing Plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... projects of the Plan, including pilot projects and operational elements, based on the best scientific... Florida Water Management District shall also consult with the South Florida Ecosystem Restoration Task...; (ii) Information obtained from pilot projects; (iii) Updated funding information; (iv) Approved...

  15. Large wind turbines: A utility option for the generation of electricity

    NASA Technical Reports Server (NTRS)

    Robbins, W. H.; Thomas, R. L.; Baldwin, D. H.

    1980-01-01

    The wind resource is such that wind energy generation has the potential to save 6-7 quads of energy nationally. Thus, the Federal Government is sponsoring and encouraging the development of cost effective and reliable wind turbines. One element of the Federal Wind Energy Programs, Large Horizontal Axis Wind Turbine Development, is managed by the NASA Lewis Research Center for the Department of Energy. There are several ongoing wind system development projects oriented primarily toward utility application within this program element. In addition, a comprehensive technology program supporting the wind turbine development projects is being conducted. An overview is presented of the NASA activities with emphasis on application of large wind turbines for generation of electricity by utility systems.

  16. Wind-fuel cell hybrid project in rural Alaska

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David Lockard

    2000-02-18

    This is a summary of the work performed on the Wind-Fuel Cell Hybrid Project: (1) On October 5th, Tim Howell of the Golden Field Office and Tom Anderson of Battelle Labs arrived in Anchorage. They met with David Lockard, Project Manager, and Percy Frisby, Director of the Alaska Rural Energy Programs Group. (2) On October 6th, Tim, Tom and David flew to Nome to inspect the proposed wind turbine site and meet with John Handeland, Director of the Nome Joint Utility System. They visited the proposed site as well as several private, residential-sized wind turbines operating in the Nome area.more » (3)Tim and Tom flew to Unalaska on October 7th to meet with Mike Golat, City of Unalaska Public Utility Director, and to inspect the proposed wind turbine sites at Pyramid Creek and Pyramid Valley. (4)Tim sent a scoping letter on December 17th to a variety of local, state and federal agencies requesting comments on the proposed wind turbine project. (5) David discussed this project with Marc Schwartz and Gerry Nix at NREL. Marc provided David with a list of wind prospectors and meteorologists. (6) Tom raised the question of FAA permits for structures over 200 feet tall. Gerry provided information on NREL's experience with FAA permitting on other projects. David summarized the potential turbine choices and heights in a spreadsheet and initiated contact with the Alaska region FAA office regarding the permitting process. (7) David responded to a list of design questions from Tom regarding the project foundations, power output, and size for use in developing the environmental assessment. (8) David tried to get wind data for the Nome Anvil Mountain White Alice site from the Corps of Engineers and the Air Force, but was not able to find any. (9) David solicited quotes from vendors of wind monitoring equipment and provided cost information to Doug Hooker, federal grant manager in preparation for ordering the equipment.« less

  17. 77 FR 35423 - Notice of Availability of the Record of Decision for the Ocotillo Express LLC's Ocotillo Wind...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-13

    ... as originally proposed would have consisted of 155 wind turbines (1.6 to 3.0 MW each) on 12,436 acres... the Refined Project, which involves the construction and operation of 112 wind turbines at the project... of the wind generation facility consisting of: up to 112 turbines with a generating capacity of 315...

  18. Solar- and wind-powered irrigation systems

    NASA Astrophysics Data System (ADS)

    Enochian, R. V.

    1982-02-01

    Five different direct solar and wind energy systems are technically feasible for powering irrigation pumps. However, with projected rates of fossil fuel costs, only two may produce significant unsubsidied energy for irrigation pumping before the turn of the century. These are photovoltaic systems with nonconcentrating collectors (providing that projected costs of manufacturing solar cells prove correct); and wind systems, especially in remote areas where adequate wind is available.

  19. Bibliography of NASA-related publications on wind turbine technology 1973-1995

    NASA Technical Reports Server (NTRS)

    Spera, David A.

    1995-01-01

    A major program of research and development projects on wind turbines for generating electricity was conducted at the NASA Lewis Research Center from 1973 to 1988. Most of these projects were sponsored by the U.S. Department of Energy (DOE), as a major element of its Federal Wind Energy Program. One other large-scale wind turbine project was sponsored by the Bureau of Reclamation of the Department of Interior (DOI). The peak years for wind energy work at Lewis were 1979-80, when almost 100 engineers, technicians, and administrative personnel were involved. From 1988 their conclusion in 1995, NASA wind energy activities have been directed toward the transfer of technology to commercial and academic organizations. Wind energy activities at NASA can be divided into two broad categories which are closely related and often overlapping: (1) Designing, building, and testing a series of 12 large-scale, experimental, horizontal-axis wind turbines (HAWT's); and (2) conducting supporting research and technology (SR&T) projects. The purpose of this bibliography is to assist those active in the field of wind energy in locating the technical information they need on wind power planning, wind loads, turbine design and analysis, fabrication and installation, laboratory and field testing, and operations and maintenance. This bibliography contains approximately 620 citations of publications by over 520 authors and co-authors. Sources are: (1) NASA reports authored by government grantee, and contractor personnel, (2) papers presented by attendees at NASA-sponsored workshops and conferences, (3) papers presented by NASA personnel at outside workshops and conferences, and (4) outside publications related to research performed at NASA/ DOE wind turbine sites.

  20. The Coordinated Ocean Wave Climate Project

    NASA Astrophysics Data System (ADS)

    Hemer, Mark; Dobrynin, Mikhail; Erikson, Li; Lionello, Piero; Mori, Nobuhito; Semedo, Alvaro; Wang, Xiaolan

    2016-04-01

    Future 21st Century changes in wind-wave climate have broad implications for marine and coastal infrastructure and ecosystems. Atmosphere-ocean general circulation models (GCM) are now routinely used for assessing and providing future projections of climatological parameters such as temperature and precipitation, but generally these provide no information on ocean wind-waves. To fill this information gap a growing number of studies are using GCM outputs and independently producing global and regional scale wind-wave climate projections. Furthermore, additional studies are actively coupling wind-wave dependent atmosphere-ocean exchanges into GCMs, to improve physical representation and quantify the impact of waves in the coupled climate system, and can also deliver wave characteristics as another variable in the climate system. To consolidate these efforts, understand the sources of variance between projections generated by different methodologies and International groups, and ultimately provide a robust picture of the role of wind-waves in the climate system and their projected changes, we present outcomes of the JCOMM supported Coordinated Ocean Wave Climate Project (COWCLIP). The objective of COWCLIP is twofold: to make community based ensembles of wave climate projections openly accessible, to provide the necessary information to support diligent marine and coastal impacts of climate change studies; and to understand the effects and feedback influences of wind-waves in the coupled ocean-atmosphere climate system. We will present the current status of COWCLIP, providing an overview of the objectives, analysis and results of the initial phase - now complete - and the progress of ongoing phases of the project.

  1. Aleutian Pribilof Islands Wind Energy Feasibility Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bruce A. Wright

    2012-03-27

    Under this project, the Aleutian Pribilof Islands Association (APIA) conducted wind feasibility studies for Adak, False Pass, Nikolski, Sand Point and St. George. The DOE funds were also be used to continue APIA's role as project coordinator, to expand the communication network quality between all participants and with other wind interest groups in the state and to provide continued education and training opportunities for regional participants. This DOE project began 09/01/2005. We completed the economic and technical feasibility studies for Adak. These were funded by the Alaska Energy Authority. Both wind and hydro appear to be viable renewable energy optionsmore » for Adak. In False Pass the wind resource is generally good but the site has high turbulence. This would require special care with turbine selection and operations. False Pass may be more suitable for a tidal project. APIA is funded to complete a False Pass tidal feasibility study in 2012. Nikolski has superb potential for wind power development with Class 7 wind power density, moderate wind shear, bi-directional winds and low turbulence. APIA secured nearly $1M from the United States Department of Agriculture Rural Utilities Service Assistance to Rural Communities with Extremely High Energy Costs to install a 65kW wind turbine. The measured average power density and wind speed at Sand Point measured at 20m (66ft), are 424 W/m2 and 6.7 m/s (14.9 mph) respectively. Two 500kW Vestas turbines were installed and when fully integrated in 2012 are expected to provide a cost effective and clean source of electricity, reduce overall diesel fuel consumption estimated at 130,000 gallons/year and decrease air emissions associated with the consumption of diesel fuel. St. George Island has a Class 7 wind resource, which is superior for wind power development. The current strategy, led by Alaska Energy Authority, is to upgrade the St. George electrical distribution system and power plant. Avian studies in Nikolski and Sand Point have allowed for proper wind turbine siting without killing birds, especially endangered species and bald eagles. APIA continues coordinating and looking for funding opportunities for regional renewable energy projects. An important goal for APIA has been, and will continue to be, to involve community members with renewable energy projects and energy conservation efforts.« less

  2. The California Central Coast Research Partnership: Building Relationships, Partnerships and Paradigms for University-Industry Collaboration

    DTIC Science & Technology

    2013-03-25

    funded project, sensors and a control system have been installed onto the 3 kW capacity wind turbine of the Cal Poly Wind Power Research Center, which is...to full operation. This wind turbine is used to educate students for careers in the wind energy industry and related professional fields and to...conduct research into the application of advanced wind turbine technologies from large turbines onto small tur- bines. In this project, a control system

  3. Jason Jonkman | NREL

    Science.gov Websites

    -based and offshore wind turbines. He also guides projects aimed at verifying, validating, and applying developing, verifying, and validating simulation models for offshore wind turbines. He is the principal investigator for a DOE-funded project to improve the modeling of offshore floating wind system dynamics. He

  4. The Electromagnetic Impact of Wind Turbines

    DTIC Science & Technology

    2015-07-06

    Applied Project 4. TITLE AND SUBTITLE THE ELECTROMAGNETIC IMPACT OF WIND TURBINES 5. FUNDING NUMBERS 6. AUTHOR(S) Gregory Sasarita and Charles R...DISTRIBUTION CODE A 13. ABSTRACT (maximum 200 words) The objective of this project was to investigate the impact that a wind turbine can have on

  5. Explaining technological change of wind power in China and the United States: Roles of energy policies, technological learning, and collaboration

    NASA Astrophysics Data System (ADS)

    Tang, Tian

    The following dissertation explains how technological change of wind power, in terms of cost reduction and performance improvement, is achieved in China and the US through energy policies, technological learning, and collaboration. The objective of this dissertation is to understand how energy policies affect key actors in the power sector to promote renewable energy and achieve cost reductions for climate change mitigation in different institutional arrangements. The dissertation consists of three essays. The first essay examines the learning processes and technological change of wind power in China. I integrate collaboration and technological learning theories to model how wind technologies are acquired and diffused among various wind project participants in China through the Clean Development Mechanism (CDM)--an international carbon trade program, and empirically test whether different learning channels lead to cost reduction of wind power. Using pooled cross-sectional data of Chinese CDM wind projects and spatial econometric models, I find that a wind project developer's previous experience (learning-by-doing) and industrywide wind project experience (spillover effect) significantly reduce the costs of wind power. The spillover effect provides justification for subsidizing users of wind technologies so as to offset wind farm investors' incentive to free-ride on knowledge spillovers from other wind energy investors. The CDM has played such a role in China. Most importantly, this essay provides the first empirical evidence of "learning-by-interacting": CDM also drives wind power cost reduction and performance improvement by facilitating technology transfer through collaboration between foreign turbine manufacturers and local wind farm developers. The second essay extends this learning framework to the US wind power sector, where I examine how state energy policies, restructuring of the electricity market, and learning among actors in wind industry lead to performance improvement of wind farms. Unlike China, the restructuring of the US electricity market created heterogeneity in transmission network governance across regions. Thus, I add transmission network governance to my learning framework to test the impacts of different transmission network governance models. Using panel data of existing utility-scale wind farms in US during 2001-2012 and spatial models, I find that the performance of a wind project is improved through more collaboration among project participants (learning-by-interacting), and this improvement is even greater if the wind project is interconnected to a regional transmission network coordinated by an independent system operator or a regional transmission organization (ISO/RTO). In the third essay, I further explore how different transmission network governance models affect wind power integration through a comparative case study. I compare two regional transmission networks, which represent two major transmission network governance models in the US: the ISO/RTO-governance model and the non-RTO model. Using archival data and interviews with key network participants, I find that a centralized transmission network coordinated through an ISO/RTO is more effective in integrating wind power because it allows resource pooling and optimal allocating of the resources by the central network administrative agency (NAO). The case study also suggests an alternative path to improved network effectiveness for a less cohesive network, which is through more frequent resource exchange among subgroups within a large network. On top of that, this essay contributes to the network governance literature by providing empirical evidence on the coexistence of hierarchy, market, and collaboration in complex service delivery networks. These coordinating mechanisms complement each other to provide system flexibility and stability, particularly when the network operates in a turbulent environment with changes and uncertainties.

  6. The Vision Outreach Project: A Pilot Project to Train Teachers of Visually Impaired Students in Alabama.

    ERIC Educational Resources Information Center

    Sanspree, M. J.; And Others

    1991-01-01

    This article describes the Vision Outreach Project--a pilot project of the University of Alabama at Birmingham for training teachers of visually impaired students. The project produced video modules to provide distance education in rural and urban areas. The modules can be used to complete degree requirements or in-service training and continuing…

  7. Project Senior. Innovations in Educational Programming for the Elderly. A Pilot Project: Thermopolis, Wyoming. [Final Report].

    ERIC Educational Resources Information Center

    Owsley, Jean

    A pilot project, entitled Project Senior, was developed and implemented to provide innovative educational programing for older adults in the small rural setting of Thermopolis, Wyoming. Included among the major project activities were the following: a door-to-door survey of 759 persons over 55 years old to determine those courses most desired by…

  8. Resolving Environmental Effects of Wind Energy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sinclair, Karin C; DeGeorge, Elise M; Copping, Andrea E.

    Concerns for potential wildlife impacts resulting from land-based and offshore wind energy have created challenges for wind project development. Research is not always adequately supported, results are neither always readily accessible nor are they satisfactorily disseminated, and so decisions are often made based on the best available information, which may be missing key findings. The potential for high impacts to avian and bat species and marine mammals have been used by wind project opponents to stop, downsize, or severely delay project development. The global nature of the wind industry - combined with the understanding that many affected species cross-national boundaries,more » and in many cases migrate between continents - also points to the need to collaborate on an international level. The International Energy Agency (IEA) Wind Technology Collaborative Programs facilitates coordination on key research issues. IEA Wind Task 34 - WREN: Working Together to Resolve Environmental Effects of Wind Energy-is a collaborative forum to share lessons gained from field research and modeling, including management methods, wildlife monitoring methods, best practices, study results, and successful approaches to mitigating impacts and addressing the cumulative effects of wind energy on wildlife.« less

  9. Proposed Columbia Wind Farm No. 1 : Final Environmental Impact Statement, Joint NEPA/SEPA.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Klickitat County

    1995-09-01

    CARES proposes to construct and operate the 25 megawatt Columbia Wind Farm No. 1 (Project) in the Columbia Hills area of Klickitat County, Washington known as Juniper Point. Wind is not a constant resource and based on the site wind measurement data, it is estimated that the Project would generate approximately 7 average annual MWs of electricity. BPA proposes to purchase the electricity generated by the Project. CARES would execute a contractual agreement with a wind developer, to install approximately 91 wind turbines and associated facilities to generate electricity. The Project`s construction and operation would include: install concrete pier foundationsmore » for each wind turbine; install 91 model AWT-26 wind turbines using 43 m high guyed tubular towers on the pier foundations; construct a new 115/24-kv substation; construct a 149 m{sup 2} steel operations and maintenance building; install 25 pad mount transformers along the turbine access roads; install 4.0 km of underground 24 kv power collection lines to collect power from individual turbines to the end of turbine strings; install 1.2 km of underground communication and transmission lines from each turbine to a pad mount transformer; install 5.6 km of 24 kv wood pole transmission lines to deliver electricity from the pad mount transformers to the Project substation; install 3.2 km of 115 kv wood pole transmission lines to deliver electricity from the Project substation to the Public Utility District No. 1 of Klickitat County(PUD)115 kv Goldendale line; interconnect with the BPA transmission system through the Goldendale line and Goldendale substation owned by the PUD; reconstruct, upgrade, and maintain 8.0 km of existing roads; construct and maintain 6.4 km of new graveled roads along the turbine strings and to individual turbines; and install meteorological towers guyed with rebar anchors on the Project site.« less

  10. IEA Wind Task 26 - Multi-national Case Study of the Financial Cost of Wind Energy; Work Package 1 Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schwabe, P.; Lensink, S.; Hand, M.

    2011-03-01

    The lifetime cost of wind energy is comprised of a number of components including the investment cost, operation and maintenance costs, financing costs, and annual energy production. Accurate representation of these cost streams is critical in estimating a wind plant's cost of energy. Some of these cost streams will vary over the life of a given project. From the outset of project development, investors in wind energy have relatively certain knowledge of the plant's lifetime cost of wind energy. This is because a wind energy project's installed costs and mean wind speed are known early on, and wind generation generallymore » has low variable operation and maintenance costs, zero fuel cost, and no carbon emissions cost. Despite these inherent characteristics, there are wide variations in the cost of wind energy internationally, which is the focus of this report. Using a multinational case-study approach, this work seeks to understand the sources of wind energy cost differences among seven countries under International Energy Agency (IEA) Wind Task 26 - Cost of Wind Energy. The participating countries in this study include Denmark, Germany, the Netherlands, Spain, Sweden, Switzerland, and the United States. Due to data availability, onshore wind energy is the primary focus of this study, though a small sample of reported offshore cost data is also included.« less

  11. Project Ukko - Design of a climate service visualisation interface for seasonal wind forecasts

    NASA Astrophysics Data System (ADS)

    Hemment, Drew; Stefaner, Moritz; Makri, Stephann; Buontempo, Carlo; Christel, Isadora; Torralba-Fernandez, Veronica; Gonzalez-Reviriego, Nube; Doblas-Reyes, Francisco; de Matos, Paula; Dykes, Jason

    2016-04-01

    Project Ukko is a prototype climate service to visually communicate probabilistic seasonal wind forecasts for the energy sector. In Project Ukko, an interactive visualisation enhances the accessibility and readability to the latests advances in seasonal wind speed predictions developed as part of the RESILIENCE prototype of the EUPORIAS (EC FP7) project. Climate services provide made-to-measure climate information, tailored to the specific requirements of different users and industries. In the wind energy sector, understanding of wind conditions in the next few months has high economic value, for instance, for the energy traders. Current energy practices use retrospective climatology, but access to reliable seasonal predictions based in the recent advances in global climate models has potential to improve their resilience to climate variability and change. Despite their potential benefits, a barrier to the development of commercially viable services is the complexity of the probabilistic forecast information, and the challenge of communicating complex and uncertain information to decision makers in industry. Project Ukko consists of an interactive climate service interface for wind energy users to explore probabilistic wind speed predictions for the coming season. This interface enables fast visual detection and exploration of interesting features and regions likely to experience unusual changes in wind speed in the coming months.The aim is not only to support users to better understand the future variability in wind power resources, but also to bridge the gap between practitioners' traditional approach and the advanced prediction systems developed by the climate science community. Project Ukko is presented as a case study of cross-disciplinary collaboration between climate science and design, for the development of climate services that are useful, usable and effective for industry users. The presentation will reflect on the challenge of developing a climate service for industry users in the wind energy sector, the background to this challenge, our approach, and the evaluation of the visualisation interface.

  12. Impacts of past and future climate change on wind energy resources in the United States

    NASA Astrophysics Data System (ADS)

    McCaa, J. R.; Wood, A.; Eichelberger, S.; Westrick, K.

    2009-12-01

    The links between climate change and trends in wind energy resources have important potential implications for the wind energy industry, and have received significant attention in recent studies. We have conducted two studies that provide insights into the potential for climate change to affect future wind power production. In one experiment, we projected changes in power capacity for a hypothetical wind farm located near Kennewick, Washington, due to greenhouse gas-induced climate change, estimated using a set of regional climate model simulations. Our results show that the annual wind farm power capacity is projected to decrease 1.3% by 2050. In a wider study focusing on wind speed instead of power, we analyzed projected changes in wind speed from 14 different climate simulations that were performed in support of the Fourth Assessment Report of the Intergovernmental Panel on Climate Change (IPCC AR4). Our results show that the predicted ensemble mean changes in annual mean wind speeds are expected to be modest. However, seasonal changes and changes predicted by individual models are large enough to affect the profitability of existing and future wind projects. The majority of the model simulations reveal that near-surface wind speed values are expected to shift poleward in response to the IPCC A2 emission scenario, particularly during the winter season. In the United States, most models agree that the mean annual wind speed values will increase in a region extending from the Great Lakes southward across the Midwest and into Texas. Decreased values, though, are predicted across most of the western United States. However, these predicted changes have a strong seasonal dependence, with wind speed increases over most of the United States during the winter and decreases over the northern United States during the summer.

  13. 75 FR 75532 - Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-03

    ...] Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report AGENCY: Federal Highway... participating in the Pilot Program, 23 U.S.C. 327(g) mandates semiannual audits during each of the first 2 years of State participation. This notice announces and solicits comments on the fifth audit report for the...

  14. 76 FR 5237 - Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-28

    ...] Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report AGENCY: Federal Highway... participating in the Pilot Program, 23 U.S.C. 327(g) mandates semiannual audits during each of the first 2 years of State participation. This final report presents the findings from the fifth FHWA audit of the...

  15. 20 CFR 416.250 - Experimental, pilot, and demonstration projects in the SSI program.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... you are placed in a control group which is not subject to the alternative requirements, limitations... 20 Employees' Benefits 2 2011-04-01 2011-04-01 false Experimental, pilot, and demonstration... Because of Essential Persons § 416.250 Experimental, pilot, and demonstration projects in the SSI program...

  16. 20 CFR 416.250 - Experimental, pilot, and demonstration projects in the SSI program.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... you are placed in a control group which is not subject to the alternative requirements, limitations... 20 Employees' Benefits 2 2013-04-01 2013-04-01 false Experimental, pilot, and demonstration... Because of Essential Persons § 416.250 Experimental, pilot, and demonstration projects in the SSI program...

  17. 20 CFR 416.250 - Experimental, pilot, and demonstration projects in the SSI program.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... you are placed in a control group which is not subject to the alternative requirements, limitations... 20 Employees' Benefits 2 2014-04-01 2014-04-01 false Experimental, pilot, and demonstration... Because of Essential Persons § 416.250 Experimental, pilot, and demonstration projects in the SSI program...

  18. 20 CFR 416.250 - Experimental, pilot, and demonstration projects in the SSI program.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... you are placed in a control group which is not subject to the alternative requirements, limitations... 20 Employees' Benefits 2 2012-04-01 2012-04-01 false Experimental, pilot, and demonstration... Because of Essential Persons § 416.250 Experimental, pilot, and demonstration projects in the SSI program...

  19. 20 CFR 416.250 - Experimental, pilot, and demonstration projects in the SSI program.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... you are placed in a control group which is not subject to the alternative requirements, limitations... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Experimental, pilot, and demonstration... Because of Essential Persons § 416.250 Experimental, pilot, and demonstration projects in the SSI program...

  20. 77 FR 26355 - Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-03

    ...] Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report AGENCY: Federal Highway... participating in the Pilot Program, 23 U.S.C. 327(g) mandates semiannual audits during each of the first 2 years of State participation. This final report presents the findings from the sixth FHWA audit of the...

  1. School Buildings in Greece: The Bioclimatic Challenge and a Photovoltaic Pilot Project

    ERIC Educational Resources Information Center

    Patargias, Panagiotis A.; Angela, Kalianou; Galanis, George; Vassilopoulou, Marina; Drosou, Maria; Protogeropoulos, Christos

    2007-01-01

    Greece's School Buildings Organisation (SBO) is developing bioclimatic pilot schemes which are yielding positive results. Bioclimatic action has been one of the principal priorities of Greek school infrastructure planning since 2004. Among the activities undertaken by SBO to use renewable energy sources in school buildings is a pilot project to…

  2. Perspective traffic display format and airline pilot traffic avoidance

    NASA Technical Reports Server (NTRS)

    Ellis, Stephen R.; Mcgreevy, Michael W.; Hitchcock, Robert J.

    1987-01-01

    Part-task experiments have examined perspective projections of cockpit displays of traffic information as a means of presenting aircraft separation information to airline pilots. Ten airline pilots served as subjects in an experiment comparing the perspective projection with plan-view projections of the same air traffic situations. The pilots' task was to monitor the traffic display in order to decide if an avoidance maneuver was needed. Pilots took more time to select avoidance maneuvers with a conventional plan-view display than with an experimental perspective display. In contrast to previous results, if the pilots selected a maneuver with the perspective display, they were more likely to choose one with a vertical component. Tabulation of the outcomes of their initial avoidance decisions with both perspective and plan-view displays showed that they were more likely to achieve required separation with maneuvers chosen with the aid of perspective displays.

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    William Morris; Dennis Fitzpatrick

    This final report is issued for the "Supplemental power for the Town of Browning waste-water treatment facility" under the Field Verification Program for Small Wind Turbines Grant. The grant application was submitted on April 16, 1999 wherein the full description of this project is outlined. The project was initially designed to test the Bergy small wind turbines, 10 kW, applicability to residential and commercial applications. The objectives of the project were the following: 1. To verify the performance of the BWC Excel-S/E model wind turbine in an operational application in the fierce winds and severe weather conditions of the Classmore » V winds of the Blackfeet Indian Reservation of Northern Montana. 2. To open up the Blackfeet reservation and northern Montana, to government sponsored, regionally distributed wind generation programs. 3. To examine the natural partnership of wind/electric with water pumping and water purification applications whose requirements parallel the variably available nature of energy produced by wind. 4. To provide data and hands-on experience to citizens, scientists, political leaders, utility operators and Tribal planners with regard to the potential uses of small-capacity, distributed-array wind turbines on the Blackfeet Reservation and in other areas of northern Montana. This project has not been without a few, which were worked out and at the time of this report continue to be worked on with the installation of two new Trace Technologies invertors and a rebuilt one with new technology inside. For the most part when the system has worked it produced power that was used within the wastewater system as was the purpose of this project.« less

  4. Large wind-turbine projects in the United States wind energy program

    NASA Technical Reports Server (NTRS)

    Thomas, R. L.; Robbins, W. H.

    1980-01-01

    The technological development of large, horizontal-axis wind turbines (100 kW-2500 kW) is surveyed with attention to prototype projects managed by NASA. Technical feasibility has been demonstrated in utility service for systems with a rated power of up to 200 kW and a rotor diameter of 125 ft (Mod-OA). Current designs of large wind turbines such as the 2500 kW Mod-2 are projected to be cost competitive for utility applications when produced in quantity, with capital costs of 600 to 700 dollars per kW (in 1977 dollars).

  5. 77 FR 48138 - Topaz Solar Farms LLC; High Plains Ranch II, LLC; Bethel Wind Energy LLC; Rippey Wind Energy LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-13

    ... Ranch II, LLC; Bethel Wind Energy LLC; Rippey Wind Energy LLC; Pacific Wind, LLC; Colorado Highlands Wind, LLC; Shooting Star Wind Project, LLC; Notice of Effectiveness of Exempt Wholesale Generator or...

  6. The Biomarker Knowledge System Informatics Pilot Project Supplement To The Biomarker Development Laboratory at Moffitt (Bedlam) — EDRN Public Portal

    Cancer.gov

    The Biomarker Knowledge System Informatics Pilot Project goal will develop network interfaces among databases that contain information about existing clinical populations and biospecimens and data relating to those specimens that are important in biomarker assay validation. This protocol comprises one of two that will comprise the Moffitt participation in the Biomarker Knowledge System Informatics Pilot Project. THIS PROTOCOL (58) is the Sput-Epi Database.

  7. 76 FR 66284 - Wind and Water Power Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-26

    ... projects and the overall Water Power Program research portfolio, a report will be compiled by DOE, which... DEPARTMENT OF ENERGY Office of Energy Efficiency and Renewable Energy Wind and Water Power Program... projects. The 2011 Wind and Water Power Program, Water Power Peer Review Meeting will review the Program's...

  8. 2015 Wind Technologies Market Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wiser, Ryan; Bolinger, Mark; Barbose, Galen

    Annual wind power capacity additions in the United States surged in 2015 and are projected to continue at a rapid clip in the coming five years. Recent and projected near-term growth is supported by the industry’s primary federal incentive—the production tax credit (PTC)—having been extended for several years (though with a phase-down schedule, described further on pages 68-69), as well as a myriad of state-level policies. Wind additions are also being driven by improvements in the cost and performance of wind power technologies, yielding low power sales prices for utility, corporate, and other purchasers. At the same time, the prospectsmore » for growth beyond the current PTC cycle remain uncertain: growth could be blunted by declining federal tax support, expectations for low natural gas prices, and modest electricity demand growth. This annual report—now in its tenth year—provides a detailed overview of developments and trends in the U.S. wind power market, with a particular focus on 2015. The report begins with an overview of key installation-related trends: trends in U.S. wind power capacity growth; how that growth compares to other countries and generation sources; the amount and percentage of wind energy in individual states; the status of offshore wind power development; and the quantity of proposed wind power capacity in various interconnection queues in the United States. Next, the report covers an array of wind power industry trends: developments in turbine manufacturer market share; manufacturing and supply-chain developments; wind turbine and component imports into and exports from the United States; project financing developments; and trends among wind power project owners and power purchasers. The report then turns to a summary of wind turbine technology trends: turbine size, hub height, rotor diameter, specific power, and IEC Class. After that, the report discusses wind power performance, cost, and pricing trends. In so doing, it describes trends in project performance, wind turbine transaction prices, installed project costs, and operations and maintenance (O&M) expenses. It also reviews the prices paid for wind power in the United States and how those prices compare to short-term wholesale electricity prices and forecasts of future natural gas prices. Next, the report examines policy and market factors impacting the domestic wind power market, including federal and state policy drivers as well as transmission and grid integration issues. The report concludes with a preview of possible near-term market developments. This edition of the annual report updates data presented in previous editions while highlighting key trends and important new developments from 2015. The report concentrates on larger, utility-scale wind turbines, defined here as individual turbines that exceed 100 kW in size.« less

  9. Big Spring wind project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Herrera, G.L.

    1999-11-01

    Harnessing the wind is not a new concept to Texans. But it is a concept that has evolved over the years from one of pumping water to fill stock tanks for watering livestock to one of providing electricity for the people of Texas. This evolution has occurred due to improved micro-siting techniques that help identify robust wind resource sites and wind turbine technology that improves wind capture and energy conversion efficiencies. Over the last seven to ten years this siting technology and wind turbine technology have significantly reduced the bus-bar cost associated with wind generation. On December 2, 1998, atmore » a public dedication of the Big Spring Wind Project, the first of 42 Vestas V47 wind turbines was released for commercial operation. Since that date an additional fifteen V47 Turbines have been placed into service. It is expected that the Big Spring Wind Project will be complete and released of full operation prior to the summer peak-load season of 1999. As of the writing of this paper (January 1999) the Vestas V47 turbines have performed as expected with excellent availability and, based on foregoing resource analysis, better than expected output.« less

  10. IEA Wind Task 26: Offshore Wind Farm Baseline Documentation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smart, Gavin; Smith, Aaron; Warner, Ethan

    This document has been produced to provide the definition and rationale for the Baseline Offshore Wind Farm established within IEA Wind Task 26--Cost of Wind Energy. The Baseline has been developed to provide a common starting point for country comparisons and sensitivity analysis on key offshore wind cost and value drivers. The baseline project reflects an approximate average of the characteristics of projects installed between 2012 and 2014, with the project life assumed to be 20 years. The baseline wind farm is located 40 kilometres (km) from construction and operations and maintenance (O&M) ports and from export cable landfall. Themore » wind farm consists of 100 4-megawatt (MW) wind turbines mounted on monopile foundations in an average water depth of 25 metres (m), connected by 33-kilovolt (kV) inter-array cables. The arrays are connected to a single offshore substation (33kV/220kV) mounted on a jacket foundation, with the substation connected via a single 220kV export cable to an onshore substation, 10km from landfall. The wind farm employs a port-based O&M strategy using crew-transfer vessels.« less

  11. The effects of motion and g-seat cues on pilot simulator performance of three piloting tasks

    NASA Technical Reports Server (NTRS)

    Showalter, T. W.; Parris, B. L.

    1980-01-01

    Data are presented that show the effects of motion system cues, g-seat cues, and pilot experience on pilot performance during takeoffs with engine failures, during in-flight precision turns, and during landings with wind shear. Eight groups of USAF pilots flew a simulated KC-135 using four different cueing systems. The basic cueing system was a fixed-base type (no-motion cueing) with visual cueing. The other three systems were produced by the presence of either a motion system or a g-seat, or both. Extensive statistical analysis of the data was performed and representative performance means were examined. These data show that the addition of motion system cueing results in significant improvement in pilot performance for all three tasks; however, the use of g-seat cueing, either alone or in conjunction with the motion system, provides little if any performance improvement for these tasks and for this aircraft type.

  12. Piloted simulation study of an ILS approach of a twin-pusher business/commuter turboprop aircraft configuration

    NASA Technical Reports Server (NTRS)

    Riley, Donald R.; Brandon, Jay M.; Glaab, Louis J.

    1994-01-01

    A six-degree-of-freedom nonlinear simulation of a twin-pusher, turboprop business/commuter aircraft configuration representative of the Cessna ATPTB (Advanced turboprop test bed) was developed for use in piloted studies with the Langley General Aviation Simulator. The math models developed are provided, simulation predictions are compared with with Cessna flight-test data for validation purposes, and results of a handling quality study during simulated ILS (instrument landing system) approaches and missed approaches are presented. Simulated flight trajectories, task performance measures, and pilot evaluations are presented for the ILS approach and missed-approach tasks conducted with the vehicle in the presence of moderate turbulence, varying horizontal winds and engine-out conditions. Six test subjects consisting of two research pilots, a Cessna test pilot, and three general aviation pilots participated in the study. This effort was undertaken in cooperation with the Cessna Aircraft Company.

  13. Colorado Public Utility Commission's Xcel Wind Decision

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lehr, R. L.; Nielsen, J.; Andrews, S.

    2001-09-20

    In early 2001 the Colorado Public Utility Commission ordered Xcel Energy to undertake good faith negotiations for a wind plant as part of the utility's integrated resource plan. This paper summarizes the key points of the PUC decision, which addressed the wind plant's projected impact on generation cost and ancillary services. The PUC concluded that the wind plant would cost less than new gas-fired generation under reasonable gas cost projections.

  14. Evaluation of bridge decks using non-destructive evaluation (NDE) at near highway speeds for effective asset management - pilot project.

    DOT National Transportation Integrated Search

    2016-09-29

    This project piloted the findings from an initial research and development project pertaining to the detection, : quantification, and visualization of bridge deck distresses through the use of remote sensing techniques, specifically : combining optic...

  15. Texas Urban Triangle : pilot study to implement a spatial decision support system (SDSS) for sustainable mobility.

    DOT National Transportation Integrated Search

    2011-03-01

    This project addressed sustainable transportation in the Texas Urban Triangle (TUT) by conducting a pilot : project at the county scale. The project tested and developed the multi-attribute Spatial Decision Support : System (SDSS) developed in 2009 u...

  16. Pilot testing of SHRP 2 reliability data and analytical products: Florida. [supporting datasets

    DOT National Transportation Integrated Search

    2014-01-01

    SHRP 2 initiated the L38 project to pilot test products from five of the programs completed projects. The products support reliability estimation and use based on data analyses, analytical techniques, and decision-making framework. The L38 project...

  17. Renewable Energy Development in Hermosa Beach, California

    NASA Astrophysics Data System (ADS)

    Morris, K.

    2016-12-01

    The City of Hermosa Beach, California, with the support of the AGU's TEX program, is exploring the potential for renewable energy generation inside the City, as part of the implementation of the City's 2015 Municipal Carbon Neutral Plan. Task 1: Estimate the technical potential of existing and future technologies Given the City's characteristics, this task will identify feasible technologies: wind, solar, tidal/wave, wastewater biogas, landfill biogas, microscale anaerobic digestion (AD), and complementary energy storage. Some options may be open to the City acting alone, but others will require working with municipal partners and private entities that provide services to Hermosa Beach (e.g., wastewater treatment). Energy storage is a means to integrate intermittent renewable energy output. Task 2: Review transaction types and pathways In this task, feasible technologies will be further examined in terms of municipal ordinances and contractual paths: (a) power purchase agreements (PPAs) with developers, under which the City would purchase energy or storage services directly; (b) leases with developers, under which the City would rent sites (e.g., municipal rooftops) to developers; (c) ordinances related to permitting, under which the City would reduce regulatory barriers to entry for developers; (d) pilot projects, under which the City would engage with developers to test new technologies such as wind/wave/microscale AD (pursuant to PPAs and/or leases); and (e) existing projects, under which the City would work with current wastewater and landfill contractors to understand (i) current plans to develop renewable energy, and (ii) opportunities for the City to work with such contractors to promote renewable energy. Task 3: Estimate costs by technology Finally, the last task will gather existing information about the costs, both current and projected, of the feasible technologies, including (i) overnight construction cost (capital); (ii) integration costs (e.g., charges from Edison and energy storage); (iii) costs that may be avoided due to promotion of renewable energy; and (iv) comparisons of projected annual nominal costs (in $/MWh and net present values).

  18. Assessment of Ports for Offshore Wind Development in the United States

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elkinton, Chris; Blatiak, Alicia; Ameen, Hafsa

    As offshore wind energy develops in the United States, port facilities will become strategic hubs in the offshore wind farm supply chain because all plant and transport logistics must transit through these facilities. Therefore, these facilities must provide suitable infrastructure to meet the specific requirements of the offshore wind industry. As a result, it is crucial that federal and state policy-makers and port authorities take effective action to position ports in the offshore wind value chain to take best advantage of their economic potential. The U.S. Department of Energy tasked the independent consultancy GL Garrad Hassan (GL GH) with carryingmore » out a review of the current capability of U.S. ports to support offshore wind project development and an assessment of the challenges and opportunities related to upgrading this capability to support the growth of as many as 54 gigawatts of offshore wind installed in U.S. waters by 2030. The GL GH report and the open-access web-based Ports Assessment Tool resulting from this study will aid decision-makers in making informed decisions regarding the choice of ports for specific offshore projects, and the types of investments that would be required to make individual port facilities suitable to serve offshore wind manufacturing, installation and/or operations. The offshore wind industry in the United States is still in its infancy and this study finds that additional port facilities capable of supporting offshore wind projects are needed to meet the anticipated project build-out by 2030; however, no significant barriers exist to prevent the development of such facilities. Furthermore, significant port capabilities are in place today with purpose-build port infrastructure currently being built. While there are currently no offshore wind farms operating in the United States, much of the infrastructure critical to the success of such projects does exist, albeit in the service of other industries. This conclusion is based on GL GH’s review of U.S. ports infrastructure and its readiness to support the development of proposed offshore wind projects in U.S. waters. Specific examples of facility costs and benefits are provided for five coastal regions (North Atlantic, South Atlantic, Gulf of Mexico, Great Lakes, and Pacific) around the country. GL GH began this study by identifying the logistical requirements of offshore wind ports to service offshore wind. This review was based on lessons learned through industry practice in Northern Europe. A web-based port readiness assessment tool was developed to allow a capability gap analysis to be conducted on existing port facilities based on the identified requirements. Cost models were added to the assessment tool, which allowed GL GH to estimate the total upgrade cost to a port over the period 2014-2030 based on a set of regional project build-out scenarios. Port fee information was gathered from each port allowing an estimate of the potential revenue to the port under this same set of scenarios. The comparison of these revenue and improvement cost figures provides an initial indication of the level of offshore wind port readiness. To facilitate a more in-depth infrastructure analysis, six ports from different geographic regions, with varied levels of interest and preparedness towards offshore wind, were evaluated by modeling a range of installation strategies and port use types to identify gaps in capability and potential opportunities for economic development. Commonalities, trends, and specific examples from these case studies are presented and provide a summary of the current state of offshore wind port readiness in the U.S. and also illustrate the direction some ports have chosen to take to prepare for offshore wind projects. For example, the land area required for wind turbine and foundation manufacturing is substantial, particularly due to the large size of offshore wind components. Also, the necessary bearing capacities of the quayside and storage area are typically greater for offshore wind components than for more conventional cargo handling. As a result, most U.S. ports will likely require soil strength improvements before they can fully support offshore wind project construction. As U.S. ports and offshore wind developers look to work together on specific projects, they will encounter synergies and challenges. The challenges they face will include identifying sources of funding for the facility improvements required, and addressing ports’ typical desire to engage in long-term partnerships on the order of 10-20 years. Early projects will especially feel these challenges as they set the precedent for these partnerships in the United States. This study seeks to provide information about gaps, costs, and opportunities to aid these discussions.« less

  19. OC5 Project Phase Ib: Validation of hydrodynamic loading on a fixed, flexible cylinder for offshore wind applications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robertson, Amy N.; Wendt, Fabian; Jonkman, Jason M.

    This paper summarizes the findings from Phase Ib of the Offshore Code Comparison, Collaboration, Continued with Correlation (OC5) project. OC5 is a project run under the International Energy Agency (IEA) Wind Research Task 30, and is focused on validating the tools used for modelling offshore wind systems through the comparison of simulated responses of select offshore wind systems (and components) to physical test data. For Phase Ib of the project, simulated hydrodynamic loads on a flexible cylinder fixed to a sloped bed were validated against test measurements made in the shallow water basin at the Danish Hydraulic Institute (DHI) withmore » support from the Technical University of Denmark (DTU). The first phase of OC5 examined two simple cylinder structures (Phase Ia and Ib) to focus on validation of hydrodynamic models used in the various tools before moving on to more complex offshore wind systems and the associated coupled physics. As a result, verification and validation activities such as these lead to improvement of offshore wind modelling tools, which will enable the development of more innovative and cost-effective offshore wind designs.« less

  20. OC5 Project Phase Ib: Validation of hydrodynamic loading on a fixed, flexible cylinder for offshore wind applications

    DOE PAGES

    Robertson, Amy N.; Wendt, Fabian; Jonkman, Jason M.; ...

    2016-10-13

    This paper summarizes the findings from Phase Ib of the Offshore Code Comparison, Collaboration, Continued with Correlation (OC5) project. OC5 is a project run under the International Energy Agency (IEA) Wind Research Task 30, and is focused on validating the tools used for modelling offshore wind systems through the comparison of simulated responses of select offshore wind systems (and components) to physical test data. For Phase Ib of the project, simulated hydrodynamic loads on a flexible cylinder fixed to a sloped bed were validated against test measurements made in the shallow water basin at the Danish Hydraulic Institute (DHI) withmore » support from the Technical University of Denmark (DTU). The first phase of OC5 examined two simple cylinder structures (Phase Ia and Ib) to focus on validation of hydrodynamic models used in the various tools before moving on to more complex offshore wind systems and the associated coupled physics. As a result, verification and validation activities such as these lead to improvement of offshore wind modelling tools, which will enable the development of more innovative and cost-effective offshore wind designs.« less

  1. Luce Pathways Project: A Pilot Project for Heritage Language Speakers of Mandarin Chinese, Spanish, and Japanese

    ERIC Educational Resources Information Center

    Nagano, Tomonori; Fernandez, Hector

    2016-01-01

    This article describes the development process of a project for heritage language speakers of Mandarin Chinese, Spanish, and Japanese at a high-enrollment community college in the northeast United States. This pilot project, funded by the Henry Luce Foundation, aimed to empower minority group students through active reinforcement of students'…

  2. Supporting Digital Literacy across the Curriculum through Blended Support: A Pilot Project Report

    ERIC Educational Resources Information Center

    Smith, Samara

    2014-01-01

    This article describes the Collaborative Media Center pilot at SUNY Old Westbury, a digital literacy project with the aim of narrowing the digital divide at the College by embedding digital projects across the curriculum. The article explains how the Center supported students in four linked courses to create digital projects. Assessment data and…

  3. M2-F2 with test pilot Bruce A. Peterson

    NASA Image and Video Library

    1966-09-22

    Bruce A. Peterson standing beside the M2-F2 lifting body on Rogers Dry Lake. Peterson became the NASA project pilot for the lifting body program after Milt Thompson retired from flying in late 1966. Peterson had flown the M2-F1, and made the first glide flight of the HL-10 heavy-weight lifting body in December 1966. On May 10, 1967, Peterson made his fourth glide flight in the M2-F2. This was also the M2-F2's 16th glide flight, scheduled to be the last one before the powered flights began. However, as pilot Bruce Peterson neared the lakebed, the M2-F2 suffered a pilot induced oscillation (PIO). The vehicle rolled from side to side in flight as he tried to bring it under control. Peterson recovered, but then observed a rescue helicopter that seemed to pose a collision threat. Distracted, Peterson drifted in a cross-wind to an unmarked area of the lakebed where it was very difficult to judge the height over the lakebed because of a lack of the guidance the markers provided on the lakebed runway. Peterson fired the landing rockets to provide additional lift, but he hit the lakebed before the landing gear was fully down and locked. The M2-F2 rolled over six times, coming to rest upside down. Pulled from the vehicle by Jay King and Joseph Huxman, Peterson was rushed to the base hospital, transferred to March Air Force Base and then the UCLA Hospital. He recovered but lost vision in his right eye due to a staph infection.

  4. Contrasting the projected change in extreme extratropical cyclones in the two hemispheres

    NASA Astrophysics Data System (ADS)

    Chang, E. K. M.

    2017-12-01

    Extratropical cyclones form an important part of the global circulation. They are responsible for much of the high impact weather in the mid-latitudes, including heavy precipitation, strong winds, and coastal storm surges. They are also the surface manifestation of baroclinic waves that are responsible for much of the transport of momentum, heat, and moisture across the mid-latitudes. Thus how these storms will change in the future is of much general interest. In particular, how the frequency of the extreme cyclones change are of most concern, since they are the ones that cause most damages. While the projection of a poleward shift of the Southern Hemisphere storm track and cyclone activity is widely accepted, together with a small decrease in the total number of extratropical cyclones, as discussed in the 5th Assessment Report of the Intergovernmental Panel on Climate Change (IPCC AR5), projected change in cyclone intensity is still rather uncertain. Several studies have suggested that cyclone intensity, in terms of absolute value of sea level pressure (SLP) minima or SLP perturbations, is projected to increase under global warming. However, other studies found no increase in wind speed around extratropical cyclones. In this study, CMIP5 multi-model projection of how the frequency of extreme cyclones in terms of near surface wind intensity may change under global warming has been examined. Results suggest significant increase in the occurrences of extreme cyclones in the Southern Hemisphere. In the Northern Hemisphere, CMIP5 models project a northeastward shift in extreme cyclone activity over the Pacific, and significant decrease over the Atlantic. Substantial differences are also found between projected changes in near surface wind intensity and wind intensity at 850 hPa, suggesting that wind change at 850 hPa is not a good proxy for change in surface wind intensity. Finally, projected changes in the large scale environment are examined to understand the dynamics behind these contrasting projected changes.

  5. Interim Report on the Evaluation of the Growth Model Pilot Project

    ERIC Educational Resources Information Center

    Hoffer, Thomas B.; Hedberg, E. C.; Brown, Kevin L.; Halverson, Marie L.; McDonald, Sarah-Kathryn

    2010-01-01

    The Growth Model Pilot Project (GMPP) was initiated to allow states to experiment with adjustments to the No Child Left Behind Act (NCLB) status accountability system in order to improve the validity of AYP determinations by giving schools credit for students who are making significant growth. The pilot allowed states, districts, and schools to…

  6. ICT, Professional Learning: Towards Communities of Practice

    ERIC Educational Resources Information Center

    Webb, Ivan; Robertson, Margaret; Fluck, Andrew

    2005-01-01

    This article reports on findings from "action research" pilot projects in four Tasmanian primary schools. The projects focused on the provision of professional learning to support the use of information and communication technology (ICT) in teaching and learning. These pilot projects used an approach developed from observations of…

  7. Wind power as an electrical energy source in Illinois

    NASA Astrophysics Data System (ADS)

    Wendland, W. M.

    1982-03-01

    A preliminary estimate of the total wind power available in Illinois was made using available historical data, and projections of cost savings due to the presence of wind-generated electricity were attempted. Wind data at 10 m height were considered from nine different sites in the state, with three years data nominally being included. Wind-speed frequency histograms were developed for day and night periods, using a power law function to extrapolate the 10 m readings to 20 m. Wind speeds over the whole state were found to average over 8 mph, the cut-in point for most wind turbines, for from 40-63% of the time. A maximum of 75% run-time was determined for daylight hours in April-May. A reference 1.8 kW windpowered generator was used in annual demand projections for a reference one family home, using the frequency histograms. The small generator was projected to fulfill from 25-53% of the annual load, and, based on various cost assumptions, exhibited paybacks taking from 14-27 yr.

  8. Economic and Technical Feasibility Study of Utility-Scale Wind Generation for the New York Buffalo River and South Buffalo Brownfield Opportunity Areas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roberts, J. O.; Mosey, G.

    2014-04-01

    Through the RE-Powering America's Land initiative, the economic and technical feasibility of utilizing contaminated lands in the Buffalo, New York, area for utility-scale wind development is explored. The study found that there is available land, electrical infrastructure, wind resource, and local interest to support a commercial wind project; however, economies of scale and local electrical markets may need further investigation before significant investment is made into developing a wind project at the Buffalo Reuse Authority site.

  9. Gearbox Reliability Collaborative Projects | Wind | NREL

    Science.gov Websites

    partners. This process documented and analyzed the design process and produced a new drivetrain design that Reliability Collaborative) activities. The new design represents the next phase in the DRC project, and will design loads required for wind turbine gearbox design and testing standards. While wind turbine gearboxes

  10. 75 FR 74040 - Intent To Prepare an Environmental Impact Statement and To Conduct Scoping Meetings...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-30

    ... Proposed Project NextEra's proposed Project would consist of up to 100 wind turbine generators with a... roads. NextEra has secured leases with willing landowners for its wind generation turbines and related... substantial natural resources conflicts. NextEra's siting process for the wind turbine strings and associated...

  11. 75 FR 5873 - Environmental Assessment or Environmental Impact Statement for Purchase of Renewable Energy From...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-04

    ... meters in rotor diameter. In addition to the wind turbines, the proposed Project will involve... of Renewable Energy From CPV Ashley Wind Power Project in North Dakota AGENCY: Tennessee Valley... this renewable energy, CPV is proposing to construct and operate a wind-powered generating facility in...

  12. 78 FR 29151 - Notice of Availability of the Final Environmental Impact Statement for the Proposed Mohave County...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-17

    .../energy/wind/mohave.html . The Project is proposed to consist of up to 283 turbines, access roads, and... be supplemented with internal access/service roads to each wind turbine. Proposed ancillary... all action alternatives, Project features within the wind-farm site would include turbines aligned...

  13. 75 FR 77654 - Notice of Intent To Prepare a Land Use Plan Amendment and an Environmental Impact Statement for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-13

    ..., maintenance, and decommissioning of wind turbine generators and associated facilities necessary to... the Pattern Energy Group Ocotillo Express Wind Energy Project, Imperial County, CA AGENCY: Bureau of... Pattern Energy Group Ocotillo Express Wind Energy Project Draft EIR/EIS by any of the following methods...

  14. Hualapai Wind Project Feasibility Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Davidson, Kevin; Randall, Mark; Isham, Tom

    The Hualapai Department of Planning and Economic Development, with funding assistance from the U.S. Department of Energy, Tribal Energy Program, with the aid of six consultants has completed the four key prerequisites as follows: 1. Identify the site area for development and its suitability for construction. 2. Determine the wind resource potential for the identified site area. 3. Determine the electrical transmission and interconnection feasibility to get the electrical power produced to the marketplace. 4. Complete an initial permitting and environmental assessment to determine the feasibility for getting the project permitted. Those studies indicated a suitable wind resource and favorablemore » conditions for permitting and construction. The permitting and environmental study did not reveal any fatal flaws. A review of the best power sale opportunities indicate southern California has the highest potential for obtaining a PPA that may make the project viable. Based on these results, the recommendation is for the Hualapai Tribal Nation to move forward with attracting a qualified wind developer to work with the Tribe to move the project into the second phase - determining the reality factors for developing a wind project. a qualified developer will bid to a utility or negotiate a PPA to make the project viable for financing.« less

  15. Wind Energy Finance (WEF): An Online Calculator for Economic Analysis of Wind Projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2004-02-01

    This brochure provides an overview of Wind Energy Finance (WEF), a free online cost of energy calculator developed by the National Renewable Energy Laboratory that provides quick, detailed economic evaluation of potential utility-scale wind energy projects. The brochure lists the features of the tool, the inputs and outputs that a user can expect, visuals of the screens and a Cash Flow Results table, and contact information.

  16. Domestic Wind Energy Workforce; NREL (National Renewable Energy Laboratory)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tegen, Suzanne

    2015-07-30

    A robust workforce is essential to growing domestic wind manufacturing capabilities. NREL researchers conducted research to better understand today's domestic wind workforce, projected needs for the future, and how existing and new education and training programs can meet future needs. This presentation provides an overview of this research and the accompanying industry survey, as well as the Energy Department's Career Maps, Jobs & Economic Development Impacts models, and the Wind for Schools project.

  17. Corrie Christol | NREL

    Science.gov Websites

    Corrie Christol Photo of Corrie Christol Corrie Christol Project Manager II-Research Support project manager for the Federal Wind, Integrated Deployment, and Wind Powering America programs. In her

  18. Multi-Axis Space Inertia Test Facility inside the Altitude Wind Tunnel

    NASA Image and Video Library

    1960-04-21

    The Multi-Axis Space Test Inertial Facility (MASTIF) in the Altitude Wind Tunnel at the National Aeronautics and Space Administration (NASA) Lewis Research Center. Although the Mercury astronaut training and mission planning were handled by the Space Task Group at Langley Research Center, NASA Lewis played an important role in the program, beginning with the Big Joe launch. Big Joe was a singular attempt early in the program to use a full-scale Atlas booster and simulate the reentry of a mockup Mercury capsule without actually placing it in orbit. A unique three-axis gimbal rig was built inside Lewis’ Altitude Wind Tunnel to test Big Joe’s attitude controls. The control system was vital since the capsule would burn up on reentry if it were not positioned correctly. The mission was intended to assess the performance of the Atlas booster, the reliability of the capsule’s attitude control system and beryllium heat shield, and the capsule recovery process. The September 9, 1959 launch was a success for the control system and heatshield. Only a problem with the Atlas booster kept the mission from being a perfect success. The MASTIF was modified in late 1959 to train Project Mercury pilots to bring a spinning spacecraft under control. An astronaut was secured in a foam couch in the center of the rig. The rig then spun on three axes from 2 to 50 rotations per minute. Small nitrogen gas thrusters were used by the astronauts to bring the MASTIF under control.

  19. Weather in the Cockpit: Priorities, Sources, Delivery, and Needs in the Next Generation Air Transportation System

    DTIC Science & Technology

    2012-07-01

    discomfort. Extreme turbulence could cause physical injuries to pilot/ passengers who are not wearing seat belts. Clear Air Turbulence (CAT) CAT... passengers who are not wearing seat belts. Generally caused by wind shear in the atmosphere where no clouds are present. Mountain Waves Fast...ways in which our analyses could inform the design of information systems. NextGen, in its mature state, envisions pilots having control over

  20. Cesar Chavez Street Headwaters Pilot LID Project

    EPA Pesticide Factsheets

    Information about the SFBWQP Cesar Chavez Street LID Pilot Project, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  1. Savannah Capacity Building Pilot Project

    EPA Pesticide Factsheets

    A series of meetings involving the Georgia Ports Authority and near-port community organizations were convened for a community capacity building pilot project. Technical assistance is being provided by EPA to support effective engagement.

  2. Estimation of wind regime from combination of RCM and NWP data in the Gulf of Riga (Baltic Sea)

    NASA Astrophysics Data System (ADS)

    Sile, T.; Sennikovs, J.; Bethers, U.

    2012-04-01

    Gulf of Riga is a semi-enclosed gulf located in the Eastern part of the Baltic Sea. Reliable wind climate data is crucial for the development of wind energy. The objective of this study is to create high resolution wind parameter datasets for the Gulf of Riga using climate and numerical weather prediction (NWP) models as an alternative to methods that rely on observations with the expectation of benefit from comparing different approaches. The models used for the estimation of the wind regime are an ensemble of Regional Climate Models (RCM, ENSEMBLES, 23 runs are considered) and high resolution NWP data. Future projections provided by RCM are of interest however their spatial resolution is unsatisfactory. We describe a method of spatial refinement of RCM data using NWP data to resolve small scale features. We apply the method of RCM bias correction (Sennikovs and Bethers, 2009) previously used for temperature and precipitation to wind data and use NWP data instead of observations. The refinement function is calculated using contemporary climate (1981- 2010) and later applied to RCM near future (2021 - 2050) projections to produce a dataset with the same resolution as NWP data. This method corrects for RCM biases that were shown to be present in the initial analysis and inter-model statistical analysis was carried out to estimate uncertainty. Using the datasets produced by this method the current and future projections of wind speed and wind energy density are calculated. Acknowledgments: This research is part of the GORWIND (The Gulf of Riga as a Resource for Wind Energy) project (EU34711). The ENSEMBLES data used in this work was funded by the EU FP6 Integrated Project ENSEMBLES (Contract number 505539) whose support is gratefully acknowledged.

  3. Genomic Encyclopedia of Type Strains, Phase I: The one thousand microbial genomes (KMG-I) project

    DOE PAGES

    Kyrpides, Nikos C.; Woyke, Tanja; Eisen, Jonathan A.; ...

    2014-06-15

    The Genomic Encyclopedia of Bacteria and Archaea (GEBA) project was launched by the JGI in 2007 as a pilot project with the objective of sequencing 250 bacterial and archaeal genomes. The two major goals of that project were (a) to test the hypothesis that there are many benefits to the use the phylogenetic diversity of organisms in the tree of life as a primary criterion for generating their genome sequence and (b) to develop the necessary framework, technology and organization for large-scale sequencing of microbial isolate genomes. While the GEBA pilot project has not yet been entirely completed, both ofmore » the original goals have already been successfully accomplished, leading the way for the next phase of the project. Here we propose taking the GEBA project to the next level, by generating high quality draft genomes for 1,000 bacterial and archaeal strains. This represents a combined 16-fold increase in both scale and speed as compared to the GEBA pilot project (250 isolate genomes in 4+ years). We will follow a similar approach for organism selection and sequencing prioritization as was done for the GEBA pilot project (i.e. phylogenetic novelty, availability and growth of cultures of type strains and DNA extraction capability), focusing on type strains as this ensures reproducibility of our results and provides the strongest linkage between genome sequences and other knowledge about each strain. In turn, this project will constitute a pilot phase of a larger effort that will target the genome sequences of all available type strains of the Bacteria and Archaea.« less

  4. Genomic Encyclopedia of Type Strains, Phase I: The one thousand microbial genomes (KMG-I) project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kyrpides, Nikos C.; Woyke, Tanja; Eisen, Jonathan A.

    The Genomic Encyclopedia of Bacteria and Archaea (GEBA) project was launched by the JGI in 2007 as a pilot project with the objective of sequencing 250 bacterial and archaeal genomes. The two major goals of that project were (a) to test the hypothesis that there are many benefits to the use the phylogenetic diversity of organisms in the tree of life as a primary criterion for generating their genome sequence and (b) to develop the necessary framework, technology and organization for large-scale sequencing of microbial isolate genomes. While the GEBA pilot project has not yet been entirely completed, both ofmore » the original goals have already been successfully accomplished, leading the way for the next phase of the project. Here we propose taking the GEBA project to the next level, by generating high quality draft genomes for 1,000 bacterial and archaeal strains. This represents a combined 16-fold increase in both scale and speed as compared to the GEBA pilot project (250 isolate genomes in 4+ years). We will follow a similar approach for organism selection and sequencing prioritization as was done for the GEBA pilot project (i.e. phylogenetic novelty, availability and growth of cultures of type strains and DNA extraction capability), focusing on type strains as this ensures reproducibility of our results and provides the strongest linkage between genome sequences and other knowledge about each strain. In turn, this project will constitute a pilot phase of a larger effort that will target the genome sequences of all available type strains of the Bacteria and Archaea.« less

  5. Improved Airplane Windshields to Provide Vision in Stormy Weather

    NASA Technical Reports Server (NTRS)

    Clay, William C

    1935-01-01

    This report presents the results of wind tunnel tests to determine possible improvements in the design of airplane windshields, particularly with respect to the pilot's vision from the cabin in stormy weather.

  6. Wind Development on Tribal Lands

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ken Haukaas; Dale Osborn; Belvin Pete

    Background: The Rosebud Sioux Tribe (RST) is located in south central South Dakota near the Nebraska border. The nearest community of size is Valentine, Nebraska. The RST is a recipient of several Department of Energy grants, written by Distributed Generation Systems, Inc. (Disgen), for the purposes of assessing the feasibility of its wind resource and subsequently to fund the development of the project. Disgen, as the contracting entity to the RST for this project, has completed all the pre-construction activities, with the exception of the power purchase agreement and interconnection agreement, to commence financing and construction of the project. Themore » focus of this financing is to maximize the economic benefits to the RST while achieving commercially reasonable rates of return and fees for the other parties involved. Each of the development activities required and its status is discussed below. Land Resource: The Owl Feather War Bonnet 30 MW Wind Project is located on RST Tribal Trust Land of approximately 680 acres adjacent to the community of St. Francis, South Dakota. The RST Tribal Council has voted on several occasions for the development of this land for wind energy purposes, as has the District of St. Francis. Actual footprint of wind farm will be approx. 50 acres. Wind Resource Assessment: The wind data has been collected from the site since May 1, 2001 and continues to be collected and analyzed. The latest projections indicate a net capacity factor of 42% at a hub height of 80 meters. The data has been collected utilizing an NRG 9300 Data logger System with instrumentation installed at 30, 40 and 65 meters on an existing KINI radio tower. The long-term annual average wind speed at 65-meters above ground level is 18.2 mph (8.1 mps) and 18.7 mph (8.4 mps) at 80-meters agl. The wind resource is excellent and supports project financing.« less

  7. Decision-Making Styles of Russian School Principals

    ERIC Educational Resources Information Center

    Kasprzhak, A. G.; Bysik, N. V.

    2015-01-01

    This work discusses the results of a pilot project performed in 2013-14 within the framework of the Asian Leadership Project international comparative study, which continues research of school leadership in Europe and America since years 2006-2008. Alongside with Russia, the pilot project also included Australia, Hong Kong, Indonesia, Malaysia,…

  8. Services for Children with Deaf-Blindness Pilot Project. Final Report.

    ERIC Educational Resources Information Center

    Stremel, Kathleen

    This final report describes a pilot project, "Quality Service Provision for Infants and Young Children with Deaf-Blindness: A Mechanism for State Intervention Teams," developed and implemented at the University of Southern Mississippi. The project developed a model of an intervention team that provides intensive training and technical…

  9. EPA Region 10 Climate Change and TMDL Pilot Project - South Fork Nooksack River, Washington

    EPA Science Inventory

    The U.S. Environmental Protection Agency (EPA) Region 10 and EPA’s Office of Research and Development (ORD) and Office of Water (OW) have launched a pilot research project to consider how projected climate change impacts could be incorporated into a TMDL and influence restoration...

  10. Wind-energy Science, Technology and Research (WindSTAR) Consortium: Curriculum, Workforce Development, and Education Plan Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Manwell, James

    2013-03-19

    The purpose of the project is to modify and expand the current wind energy curriculum at the University of Massachusetts Amherst and to develop plans to expand the graduate program to a national scale. The expansion plans include the foundational steps to establish the American Academy of Wind Energy (AAWE). The AAWE is intended to be a cooperative organization of wind energy research, development, and deployment institutes and universities across North America, whose mission will be to develop and execute joint RD&D projects and to organize high-level science and education in wind energy

  11. Performance measurements of a pilot superconducting solenoid model core for a wind tunnel magnetic suspension and balance system

    NASA Technical Reports Server (NTRS)

    Goodyer, M. J.; Britcher, C. P.

    1983-01-01

    The results of experimental demonstrations of a superconducting solenoid model core in the Southampton University Magnetic Suspension and Balance System are detailed. Technology and techniques relevant to large-scale wind tunnel MSBSs comprise the long term goals. The magnetic moment of solenoids, difficulties peculiar to superconducting solenoid cores, lift force and pitching moment, dynamic lift calibration, and helium boil-off measurements are discussed.

  12. Energy Projects in Undergraduate Physics

    ERIC Educational Resources Information Center

    Morgan, R.; And Others

    1976-01-01

    Describes a set of student projects, each involving about 240 hours of laboratory time, covering the following topics: wind power monitoring, wind generator design, solar power, and the heat pump. (MLH)

  13. Piloted Evaluation of Modernized Limited Authority Control Laws in the NASA-Ames Vertical Motion Simulator (VMS)

    NASA Technical Reports Server (NTRS)

    Sahasrabudhe, Vineet; Melkers, Edgar; Faynberg, Alexander; Blanken, Chris L.

    2003-01-01

    The UH-60 BLACK HAWK was designed in the 1970s, when the US Army primarily operated during the day in good visual conditions. Subsequently, the introduction of night-vision goggles increased the BLACK HAWK'S mission effectiveness, but the accident rate also increased. The increased accident rate is strongly tied to increased pilot workload as a result of a degradation in visual cues. Over twenty years of research in helicopter flight control and handling qualities has shown that these degraded handling qualities can be recovered by modifying the response type of the helicopter in low speed flight. Sikorsky Aircraft Corporation initiated a project under the National Rotorcraft Technology Center (NRTC) to develop modern flight control laws while utilizing the existing partial authority Stability Augmentation System (SAS) of the BLACK HAWK. This effort resulted in a set of Modernized Control Laws (MCLAWS) that incorporate rate command and attitude command response types. Sikorsky and the US Army Aeroflightdynamics Directorate (AFDD) conducted a piloted simulation on the NASA-Ames Vertical h4otion Simulator, to assess potential handling qualities and to reduce the risk of subsequent implementation and flight test of these modern control laws on AFDD's EH-60L helicopter. The simulation showed that Attitude Command Attitude Hold control laws in pitch and roll improve handling qualities in the low speed flight regime. These improvements are consistent across a range of mission task elements and for both good and degraded visual environments. The MCLAWS perform better than the baseline UH-60A control laws in the presence of wind and turbulence. Finally, while the improved handling qualities in the pitch and roll axis allow the pilot to pay more attention to the vertical axis and hence altitude performance also improves, it is clear from pilot comments and altitude excursions that the addition of an Altitude Hold function would further reduce workload and improve overall handling qualities of the aircraft.

  14. Using Motivational Enhancement Among OIF / OEF Veterans Returning to the Community

    DTIC Science & Technology

    2014-10-01

    than veterans who receive treatment as usual. During this year the pilot study for the project was completed. The purpose of the pilot study group was...pilot group members could not be used. The veterans in the pilot study were notified of the lapse and were re-consented. During the year the team...Veterans must not be currently in counseling to participate in the project. To combat this, one idea proposed is to allow veterans who live outside of

  15. Nutrition Inservice Education for Urban Day Care Providers: A Comparison of Three Models.

    ERIC Educational Resources Information Center

    Kaplan, Melissa G.

    Three different models of inservice nutrition education implemented by Detroit's Nutrition Education Training (NET) Project are described and compared. The NET Project was funded first as a pilot project in 1978-79, and was refunded in 79-80 and 80-81. The original pilot project goal was to demonstrate the value of teaching urban day care staff…

  16. KidSat: Image User's Manual

    NASA Technical Reports Server (NTRS)

    Way, JoBea; Andres, Paul; Baker, John; Goodson, Greg; Marshall, William; McGuire, John; Rackley, Kathleen; Stork, Elizabeth Jones; Yiu, Lisa

    1999-01-01

    The goal of KidSat was to provide young students with the opportunity to participate directly in the NASA space program and to enhance learning in the process. The KidSat pilot project was focused on using a color digital camera, mounted on the space shuttle, to take pictures of the Earth. These could be used to enhance middle school curricula. The project not only benefited middle school students, who were essentially the Science Team, responsible for deciding where to take pictures, but it also benefited high school students and undergraduates, who were essentially the Project Team, responsible for the development and implementation of the project. KidSat flew on three missions as part of the pilot project: STS-76, STS-81, and STS-86. This document describes the goals, project elements, results, and data for the three KidSat missions that made up the pilot program. It serves as a record for this pilot project and may be used as a reference for similar projects. It can also be a too] in using the data to its fullest extent. The KidSat Web page remains on-line at http://kidsat.jpl.nasa.gov/kidsat, and the images may be downloaded in their full resolution.

  17. New Orleans Capacity Building Pilot Project

    EPA Pesticide Factsheets

    A series of meetings involving the Port of New Orleans and near-port community organizations were convened for a community capacity building pilot project. Technical assistance is being provided by EPA to support effective engagement.

  18. Brazil advances subsea technology in Marlim pilot

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-03-29

    Petroleum Brasileiro SA has extended several water depth records for subsea technology during a pilot project in giant Marlim oil field in the Campos basin off Brazil. Petrobras finished the 10 well Marlim pilot last December. The field's pilot phase was intended to begin early production and enable Petrobras to gather more reservoir data. Ten satellite wells, including two prepilot wells, were completed during the Marlim pilot phase with guidelineless (GLL) wet christmas trees designed and fabricated by FMC Corp., Houston, and CBV Industrial Mechanic SA, Rio de Janeiro. The subsea wells are producing 52,000 b/d of oil and 21.19more » MMCfd of gas in water depths of 1,847-2,562 ft. Marlim pilot well flow is routed to a permanent semisubmersible floating production system (FPS). Oil moves from the FPS to a monobuoy that offloads to a shuttle tanker. In addition to marking the first successful uses of purpose-built GLL wet trees, FMC said the Marlim pilot project allowed GLL subsea technology to evolve from conceptual status into a proven deepwater completion method. The paper describes the project.« less

  19. Parent Attitudes Toward the Virginia Beach Year-Round School Pilot Project. Final Report.

    ERIC Educational Resources Information Center

    Schlechty, Phillip C.

    Part of the Virginia Beach year-round school program evaluation, this final report contains a detailed analysis of parental attitudes, beliefs, and perceptions. The data leads to the following conclusions: a majority (53.3 percent) of parents are dubious or negative toward the 45-15 pilot project; a slight majority of parents in the pilot schools…

  20. Projets Pilotes Quebecois Portant sur L'Integration Scolaire aux Niveaux Pre-Scolaire et Primaire (Quebec Pilot Projects on Mainstreaming of Preschool and Primary-Level Schoolchildren).

    ERIC Educational Resources Information Center

    Saint-Laurent, Lise; And Others

    1992-01-01

    This article synthesizes 55 Quebec (Canada) pilot projects on mainstreaming of pupils with learning disabilities, behavior disorders, physical or sensorial handicaps, or mental handicaps, at preschool and elementary levels. It focuses on extent of integration, interventions, training and support for teachers, and evaluation methodology used.…

  1. Assessment of the visual landscape impact and dominance of wind tubines in Austria using weighted viewshed maps

    NASA Astrophysics Data System (ADS)

    Schauppenlehner, Thomas; Salak, Boris; Scherhaufer, Patrick; Höltinger, Stefan; Schmidt, Johannes

    2017-04-01

    Due to efficiency reasons and broadly availability of wind, wind energy is in focus of strategies regarding the expansion of renewable energy and energy transition policies. Nevertheless, the dimensions of the wind turbines and rotating dynamics have a significant impact on the landscape scenery and recreation as well as tourism activities. This often leads to local opposition against wind energy projects and is a major criterion regarding the acceptance of wind energy. In the project TransWind, the social acceptance of wind energy is surveyed on the basis of different development scenarios for Austria. Therefore, a GIS-based viewshed indicator was developed to assess the visual impact of different development scenarios as well as the current situation using weighted - regarding distance, amount and masking - viewshed analysis. This weighted viewshed maps for Austria allows a comprehensive evaluation of existing and potential wind energy sites regarding dominance and visual impact and can contribute to the spatial development process of wind energy site. Different regions can be compared and repowering strategies can be evaluated. Due to the large project area, data resolutions, generalized assumptions (e.g. tree heights) and missing data (e.g. solitary trees, small hedges) at local level further analysis are necessary but it supports the assessment of large-scale development scenarios can be identified.

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rana Zucchi, Global Energy Concepts, LLC; Brad Reeve, Kotzebue Electric Association; DOE Project Officer - Doug Hooker

    The Kotzebue Wind Power Project is a joint undertaking of the U.S. Department of Energy (DOE); Kotzebue Electric Association (KEA); and the Alaska Energy Authority (AEA). The goal of the project is to develop, construct, and operate a wind power plant interconnected to a small isolated utility grid in an arctic climate in Northwest Alaska. The primary objective of KEA’s wind energy program is to bring more affordable electricity and jobs to remote Alaskan communities. DOE funding has allowed KEA to develop a multi-faceted approach to meet these objectives that includes wind project planning and development, technology transfer, and communitymore » outreach. The first wind turbines were installed in the summer of 1997 and the newest turbines were installed in the spring of 2007. The total installed capacity of the KEA wind power project is 1.16 MW with a total of 17 turbines rated between 65 kW and 100 kW. The operation of the wind power plant has resulted in a wind penetration on the utility system in excess of 35% during periods of low loads. This document and referenced attachments are presented as the final technical report for the U.S. Department of Energy (DOE) grant agreement DE-FG36-97GO10199. Interim deliverables previously submitted are also referenced within this document and where reasonable to do so, specific sections are incorporated in the report or attached as appendices.« less

  3. 78 FR 23586 - Final Environmental Impact Statement, Habitat Conservation Plan, and Implementing Agreement and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-19

    ...) from construction, operation, maintenance, and decommissioning associated with the Buckeye Wind Power... construction, operation, maintenance, and decommissioning of the project. The project consists of a 100-turbine... Draft Programmatic Agreement, Buckeye Wind Power Project, Champaign County, Ohio AGENCY: Fish and...

  4. 76 FR 44000 - Environmental Impact Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-22

    ..., NV, Salt Wells Energy Projects, Proposal for Three Separate Geothermal Energy and Transmission...-328-4200. EIS No. 20110233, Draft EIS, BLM, WY, Chokecherry and Sierra Madre Wind Energy Project, Proposes to Construct and Operate a Wind Energy Project, South of Rawlins, Carbon County, WY, Comment...

  5. 77 FR 30551 - Commercial Renewable Energy Transmission on the Outer Continental Shelf (OCS) Offshore Rhode...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-23

    ... electrical power from Deepwater Wind's proposed 30 megawatt (MW) offshore wind energy project located in... (BIWF), a proposed 30 MW offshore wind energy project located in Rhode Island State waters approximately... habitats can be found at: http://www.crmc.ri.gov/samp_ocean.html . There are several species of birds...

  6. 76 FR 65746 - Notice of Availability of Joint Final Environmental Impact Statement/Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-24

    ... Boulevard. The project will consist of up to 128 wind turbines (1.5 to 3.0 MW each) with a generating... Statement/Final Environmental Impact Report for the Tule Wind Project, California, and Notice of Intent To... Final Environmental Impact Report (EIR) as a joint environmental analysis document for Tule Wind, LLC's...

  7. Non-Economic Obstacles to Wind Deployment: Issues and Regional Differences (Presentation)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baring-Gould, I.

    2014-05-01

    This presentation provides an overview of national obstacles to wind deployment, with regional assessments. A special mention of offshore projects and distributed wind projects is provided. Detailed maps examine baseline capacity, military and flight radar, golden and bald eagle habitat, bat habitat, whooping crane habitat, and public lands. Regional deployment challenges are also discussed.

  8. Large wind turbine generators. [NASA program status and potential costs

    NASA Technical Reports Server (NTRS)

    Thomas, R. L.; Donovon, R. M.

    1978-01-01

    The large wind turbine portion of the Federal Wind Energy Program consists of two major project efforts: (1) the Mod-0 test bed project for supporting research technology, and (2) the large experimental wind turbines for electric utility applications. The Mod-0 has met its primary objective of providing the entire wind energy program with early operations and performance data. The large experimental wind turbines to be tested in utility applications include three of the Mod-0A (200 kW) type, one Mod-1 (2000 kW), and possibly several of the Mod-2 (2500 kW) designs. This paper presents a description of these wind turbine systems, their programmatic status, and a summary of their potential costs.

  9. Projected changes of the low-latitude north-western Pacific wind-driven circulation under global warming

    NASA Astrophysics Data System (ADS)

    Duan, Jing; Chen, Zhaohui; Wu, Lixin

    2017-05-01

    Based on the outputs of 25 models participating in the Coupled Model Intercomparison Project Phase 5, the projected changes of the wind-driven circulation in the low-latitude north-western Pacific are evaluated. Results demonstrate that there will be a decrease in the mean transport of the North Equatorial Current (NEC), Mindanao Current, and Kuroshio Current in the east of the Philippines, accompanied by a northward shift of the NEC bifurcation Latitude (NBL) off the Philippine coast with over 30% increase in its seasonal south-north migration amplitude. Numerical simulations using a 1.5-layer nonlinear reduced-gravity ocean model show that the projected changes of the upper ocean circulation are predominantly determined by the robust weakening of the north-easterly trade winds and the associated wind stress curl under the El Niño-like warming pattern. The changes in the wind forcing and intensified upper ocean stratification are found equally important in amplifying the seasonal migration of the NBL.

  10. JEDI Wind Models | Jobs and Economic Development Impact Models | NREL

    Science.gov Websites

    Wind Models JEDI Wind Models The Jobs and Economic Development Impacts (JEDI) Wind model allows the user to estimate economic development impacts from wind power generation projects. JEDI Wind has default information that can be used to run a generic impacts analysis assuming wind industry averages

  11. Ecosystem-based management and refining governance of wind energy in the Massachusetts coastal zone: A case study approach

    NASA Astrophysics Data System (ADS)

    Kumin, Enid C.

    While there are as yet no wind energy facilities in New England coastal waters, a number of wind turbine projects are now operating on land adjacent to the coast. In the Gulf of Maine region (from Maine to Massachusetts), at least two such projects, one in Falmouth, Massachusetts, and another on the island of Vinalhaven, Maine, began operation with public backing only to face subsequent opposition from some who were initially project supporters. I investigate the reasons for this dynamic using content analysis of documents related to wind energy facility development in three case study communities. For comparison and contrast with the Vinalhaven and Falmouth case studies, I examine materials from Hull, Massachusetts, where wind turbine construction and operation has received steady public support and acceptance. My research addresses the central question: What does case study analysis of the siting and initial operation of three wind energy projects in the Gulf of Maine region reveal that can inform future governance of wind energy in Massachusetts state coastal waters? I consider the question with specific attention to governance of wind energy in Massachusetts, then explore ways in which the research results may be broadly transferable in the U.S. coastal context. I determine that the change in local response noted in Vinalhaven and Falmouth may have arisen from a failure of consistent inclusion of stakeholders throughout the entire scoping-to-siting process, especially around the reporting of environmental impact studies. I find that, consistent with the principles of ecosystem-based and adaptive management, design of governance systems may require on-going cycles of review and adjustment before the implementation of such systems as intended is achieved in practice. I conclude that evolving collaborative processes must underlie science and policy in our approach to complex environmental and wind energy projects; indeed, collaborative process is fundamental to the successful governance of such projects, including any that may involve development of wind energy in the Massachusetts coastal zone or beyond. Three supplemental files of coded data accompany this dissertation.

  12. Rubberized asphalt concrete warranty pilot projects.

    DOT National Transportation Integrated Search

    2005-11-01

    Between 2002 and 2004 Caltrans built five pilot projects through its rehabilitation program that contain : specifications for rubberized asphalt concrete (RAC) overlay and include a 5-year warranty on the RAC : materials and workmanship. The overall ...

  13. Rethink Disposable: Packaging Waste Source Reduction Pilot Project

    EPA Pesticide Factsheets

    Information about the SFBWQP Rethink Disposable: Packaging Waste Source Reduction Pilot Project, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  14. 14 CFR 135.225 - IFR: Takeoff, approach and landing minimums.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... that airport when used as an alternate airport, for each pilot in command of a turbine-powered airplane... the lowest straight-in landing minimums, unless otherwise restricted, if— (1) The wind direction and...

  15. 14 CFR 135.225 - IFR: Takeoff, approach and landing minimums.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... that airport when used as an alternate airport, for each pilot in command of a turbine-powered airplane... the lowest straight-in landing minimums, unless otherwise restricted, if— (1) The wind direction and...

  16. Generalizability of New Standards Project, 1993 Pilot Study Tasks in Mathematics. Technical Issues in Procedures To Link State Results to a Common National Standard. Project 2.4 Quantitative Models To Monitor the Status and Progress of Learning and Performance and Their Antecedents.

    ERIC Educational Resources Information Center

    Linn, Robert L.

    The New Standards Project conducted a pilot test of a series of performance-based assessment tasks in mathematics and English language arts at Grades 4 and 8 in the spring of 1993. This paper reports the results of a series of generalizability analyses conducted for a subset of the 1993 pilot study data in mathematics. Generalizability analyses…

  17. Using Microcomputers for Communication. Summary Report: Sociology 110 Distance Education Pilot Project.

    ERIC Educational Resources Information Center

    Misanchuk, Earl R.

    A pilot project involved off-campus (distance education) students creating their assignments on Macintosh computers and "mailing" them electronically to a campus mainframe computer. The goal of the project was to determine what is necessary to implement and to evaluate the potential of computer communications for university-level…

  18. To Green or Not to Green? Evaluation of Green Stormwater Infrastructure in Kansas City Middle Blue River Project

    EPA Science Inventory

    The City of Kansas City, Mo., Water Services Department is implementing a pilot project to measure and evaluate the performance of green infrastructure. Information obtained through this pilot project will be used to guide the design of green solutions throughout Kansas City und...

  19. Albuquerque's constructed wetland pilot project for wastewater polishing

    Treesearch

    Michael D. Marcus; Shannon M. House; Nathan A. Bowles; Robert T. Sekiya; J. Steven Glass

    1999-01-01

    The City of Albuquerque has funded the Constructed Wetland Pilot Project (CWPP) since 1995 at the City's Southside Water Reclamation Plant (SWRP). Results from CWPP and other wetland treatment projects indicate that appropriately designed surface-flow wetlands could increase the cost-efficiencies of wastewater treatment, as well as help the City meet present and...

  20. Student Assessment Pilot Project: Maricopa County Community College District JCEP Project #JZ-309, 1985-86.

    ERIC Educational Resources Information Center

    Abbott, Judith A.

    A summary is provided of the 1985-86 goals and accomplishments of Maricopa County Community College District's (MCCCD's) Student Assessment Pilot Project, which was conducted to develop a districtwide database of quantitative and qualitative information upon which decisions about policies, programs, and procedures related to assessment,…

  1. Marine Arctic Ecosystem Study (MARES): Pilot Project - Marine Mammal Tagging and Tracking

    DTIC Science & Technology

    2015-09-30

    project . NOPP is an innovative collaboration of federal agencies that support ocean research partnerships among academia, government, industry, and...1 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Marine Arctic Ecosystem Study (MARES): Pilot Project ...Francis.Wiese@stantec.com Award Number: N0001415IP00085 LONG-TERM GOALS The overarching goal of the MARES project is to understand the

  2. Large, horizontal-axis wind turbines

    NASA Technical Reports Server (NTRS)

    Linscott, B. S.; Perkins, P.; Dennett, J. T.

    1984-01-01

    Development of the technology for safe, reliable, environmentally acceptable large wind turbines that have the potential to generate a significant amount of electricity at costs competitive with conventional electric generating systems are presented. In addition, these large wind turbines must be fully compatible with electric utility operations and interface requirements. There are several ongoing large wind system development projects and applied research efforts directed toward meeting the technology requirements for utility applications. Detailed information on these projects is provided. The Mod-O research facility and current applied research effort in aerodynamics, structural dynamics and aeroelasticity, composite and hybrid composite materials, and multiple system interaction are described. A chronology of component research and technology development for large, horizontal axis wind turbines is presented. Wind characteristics, wind turbine economics, and the impact of wind turbines on the environment are reported. The need for continued wind turbine research and technology development is explored. Over 40 references are sited and a bibliography is included.

  3. Thomas C. McMurtry

    NASA Technical Reports Server (NTRS)

    1982-01-01

    Thomas C. McMurtry in November 1982. He graduated in June 1957 from the University of Notre Dame with a Bachelor of Science degree in Mechanical Engineering. McMurtry had been part of the university's Navy ROTC program, and after graduation he joined the Navy as a pilot. Before retiring from the Navy in 1964 as a Lieutenant, he graduated from the U.S. Navy Test Pilot School, and had flown such aircraft as the F9F, A3D, A4D, F3D, F-8, A-6, and S-2. McMurtry was then a consultant for the Lockheed Corporation until joining NASA as a research pilot in 1967. While at the Dryden Flight Research Center, he was co-project pilot on the F-8 Digital Fly-By-Wire program, and the 747 Shuttle Carrier Aircraft, as well as project pilot on the F-15 Digital Electronic Engine Control (DEEC) project, the KC-135 Winglets, the F-8 Supercritical Wing project, and the AD-1 Oblique Wing Project. He also made research flights in NASA's YF-12C aircraft (actually a modified SR-71). McMurtry made the last glide flight of the X-24B lifting body on November 26, 1975, and was co-pilot of the 747 Shuttle Carrier Aircraft on the first free flight of the space shuttle Enterprise on August 12, 1977. He was involved in several remotely piloted research vehicle programs, including the FAA/NASA 720 Controlled Impact Demonstration and the 3/8 F-15 Spin Research Vehicle. During McMurtry's 32 years as a pilot and manager at Dryden, he received numerous awards. These include the NASA Exceptional Service Award for his work on the F-8 Supercritical Wing, and the Iven C. Kincheloe Award from the Society of Experimental Test Pilots for his role as chief pilot on the AD-1 project, the NASA Distinguished Service Medal, and the 1999 Milton O. Thomson Lifetime Achievement Award. McMurtry also held a number of management positions at Dryden, including Chief Pilot, Director of Flight Operations, Associate Director of Flight Operations, and was the acting Chief Engineer at the time of his retirement on June 3, 1999. Since becoming a pilot in 1958, he logged more than 11,000 hours of flight time, in aircraft ranging from a WACO open cockpit biplane to a Mach 3 YF-12C, as well as navy trainers, fighters and attack airplanes, the U-2, F-104 and FA-18 chase planes, and diverse research aircraft. McMurtry's fondest memories are of early morning take-offs from Edwards AFB.

  4. Neil Armstrong in the 9-by 15-Foot Low Speed Wind Tunnel

    NASA Image and Video Library

    1970-02-21

    Astronaut Neil Armstrong examines a Vertical and Short Takeoff and Landing test setup in the 9- by 15-Foot Low Speed Wind Tunnel at the National Aeronautics and Space Administration (NASA) Lewis Research Center. Armstrong spent February 6, 1970 at Lewis attending technical meetings and touring some facilities. Just six months after Armstrong had returned from the moon looming agency budget cuts were already a concern in his comments. He noted that NASA had to “find a balanced approach…and [make] aggressive use of available facilities.” Armstrong spent four months at the center as a research pilot in 1955. Armstrong had served as a Navy pilot during the Korean War then earned a degree in aeronautical engineering at Purdue University. He was recruited by Lewis while at Purdue and began at the center shortly after graduation. During his brief tenure in Cleveland Armstrong served as both a test pilot and research engineer, primarily involved with icing research. In his role as research pilot Armstrong also flew a North American F-82 Twin Mustang over the ocean near Wallops Island to launch small instrumented rockets from high altitudes down into the atmosphere to obtain high Mach numbers. After four months in Cleveland a position opened up at what is today the Dryden Flight Research Center. Armstrong’s career in Cleveland officially ended on June 30, 1955.

  5. ANEMOS: Development of a next generation wind power forecasting system for the large-scale integration of onshore and offshore wind farms.

    NASA Astrophysics Data System (ADS)

    Kariniotakis, G.; Anemos Team

    2003-04-01

    Objectives: Accurate forecasting of the wind energy production up to two days ahead is recognized as a major contribution for reliable large-scale wind power integration. Especially, in a liberalized electricity market, prediction tools enhance the position of wind energy compared to other forms of dispatchable generation. ANEMOS, is a new 3.5 years R&D project supported by the European Commission, that resembles research organizations and end-users with an important experience on the domain. The project aims to develop advanced forecasting models that will substantially outperform current methods. Emphasis is given to situations like complex terrain, extreme weather conditions, as well as to offshore prediction for which no specific tools currently exist. The prediction models will be implemented in a software platform and installed for online operation at onshore and offshore wind farms by the end-users participating in the project. Approach: The paper presents the methodology of the project. Initially, the prediction requirements are identified according to the profiles of the end-users. The project develops prediction models based on both a physical and an alternative statistical approach. Research on physical models gives emphasis to techniques for use in complex terrain and the development of prediction tools based on CFD techniques, advanced model output statistics or high-resolution meteorological information. Statistical models (i.e. based on artificial intelligence) are developed for downscaling, power curve representation, upscaling for prediction at regional or national level, etc. A benchmarking process is set-up to evaluate the performance of the developed models and to compare them with existing ones using a number of case studies. The synergy between statistical and physical approaches is examined to identify promising areas for further improvement of forecasting accuracy. Appropriate physical and statistical prediction models are also developed for offshore wind farms taking into account advances in marine meteorology (interaction between wind and waves, coastal effects). The benefits from the use of satellite radar images for modeling local weather patterns are investigated. A next generation forecasting software, ANEMOS, will be developed to integrate the various models. The tool is enhanced by advanced Information Communication Technology (ICT) functionality and can operate both in stand alone, or remote mode, or be interfaced with standard Energy or Distribution Management Systems (EMS/DMS) systems. Contribution: The project provides an advanced technology for wind resource forecasting applicable in a large scale: at a single wind farm, regional or national level and for both interconnected and island systems. A major milestone is the on-line operation of the developed software by the participating utilities for onshore and offshore wind farms and the demonstration of the economic benefits. The outcome of the ANEMOS project will help consistently the increase of wind integration in two levels; in an operational level due to better management of wind farms, but also, it will contribute to increasing the installed capacity of wind farms. This is because accurate prediction of the resource reduces the risk of wind farm developers, who are then more willing to undertake new wind farm installations especially in a liberalized electricity market environment.

  6. Offshore Wind Market and Economic Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hamilton, Bruce Duncan

    2014-08-27

    This report is the third annual assessment of the U.S. offshore wind market. It includes the following major sections: Section 1: key data on developments in the offshore wind technology sector and the global development of offshore wind projects, with a particular focus on progress in the United States; Section 2: analysis of policy developments at the federal and state levels that have been effective in advancing offshore wind deployment in the United States; Section 3: analysis of actual and projected economic impact, including regional development and job creation; Section 4: analysis of developments in relevant sectors of the economymore » with the potential to affect offshore wind deployment in the United States« less

  7. Role of Computational Fluid Dynamics and Wind Tunnels in Aeronautics R and D

    NASA Technical Reports Server (NTRS)

    Malik, Murjeeb R.; Bushnell, Dennis M.

    2012-01-01

    The purpose of this report is to investigate the status and future projections for the question of supplantation of wind tunnels by computation in design and to intuit the potential impact of computation approaches on wind-tunnel utilization all with an eye toward reducing the infrastructure cost at aeronautics R&D centers. Wind tunnels have been closing for myriad reasons, and such closings have reduced infrastructure costs. Further cost reductions are desired, and the work herein attempts to project which wind-tunnel capabilities can be replaced in the future and, if possible, the timing of such. If the possibility exists to project when a facility could be closed, then maintenance and other associated costs could be rescheduled accordingly (i.e., before the fact) to obtain an even greater infrastructure cost reduction.

  8. Global assimilation of X Project Loon stratospheric balloon observations

    NASA Astrophysics Data System (ADS)

    Coy, L.; Schoeberl, M. R.; Pawson, S.; Candido, S.; Carver, R. W.

    2017-12-01

    Project Loon has an overall goal of providing worldwide internet coverage using a network of long-duration super-pressure balloons. Beginning in 2013, Loon has launched over 1600 balloons from multiple tropical and middle latitude locations. These GPS tracked balloon trajectories provide lower stratospheric wind information over the oceans and remote land areas where traditional radiosonde soundings are sparse, thus providing unique coverage of lower stratospheric winds. To fully investigate these Loon winds we: 1) compare the Loon winds to winds produced by a global data assimilation system (DAS: NASA GEOS) and 2) assimilate the Loon winds into the same comprehensive DAS. Results show that in middle latitudes the Loon winds and DAS winds agree well and assimilating the Loon winds have only a small impact on short-term forecasting of the Loon winds, however, in the tropics the loon winds and DAS winds often disagree substantially (8 m/s or more in magnitude) and in these cases assimilating the loon winds significantly improves the forecast of the loon winds. By highlighting cases where the Loon and DAS winds differ, these results can lead to improved understanding of stratospheric winds, especially in the tropics.

  9. Global Assimilation of X Project Loon Stratospheric Balloon Observations

    NASA Technical Reports Server (NTRS)

    Coy, Lawrence; Schoeberl, Mark R.; Pawson, Steven; Candido, Salvatore; Carver, Robert W.

    2017-01-01

    Project Loon has an overall goal of providing worldwide internet coverage using a network of long-duration super-pressure balloons. Beginning in 2013, Loon has launched over 1600 balloons from multiple tropical and middle latitude locations. These GPS tracked balloon trajectories provide lower stratospheric wind information over the oceans and remote land areas where traditional radiosonde soundings are sparse, thus providing unique coverage of lower stratospheric winds. To fully investigate these Loon winds we: 1) compare the Loon winds to winds produced by a global data assimilation system (DAS: NASA GEOS) and 2) assimilate the Loon winds into the same comprehensive DAS. Results show that in middle latitudes the Loon winds and DAS winds agree well and assimilating the Loon winds have only a small impact on short-term forecasting of the Loon winds, however, in the tropics the loon winds and DAS winds often disagree substantially (8 m/s or more in magnitude) and in these cases assimilating the loon winds significantly improves the forecast of the loon winds. By highlighting cases where the Loon and DAS winds differ, these results can lead to improved understanding of stratospheric winds, especially in the tropics.

  10. Connecticut warm mix asphalt (WMA) pilot projects 2010 and 2011.

    DOT National Transportation Integrated Search

    2014-06-01

    WMA overlays were placed in several pilot projects in Connecticut during the 2010 and 2011 construction : seasons. These technologies included Sasobit, Evotherm, Advera, Double-Barrel Green foamed : asphalt as well as SonneWarmix. The res...

  11. Value pricing pilot program : lessons learned

    DOT National Transportation Integrated Search

    2008-08-01

    This "Lessons Learned Report" provides a summary of projects sponsored by the Federal Highway Administration's (FHWA's) Congestion and Value Pricing Pilot Programs from 1991 through 2006 and draws lessons from a sample of projects with the richest an...

  12. Wind Resource Assessment Report: Mille Lacs Indian Reservation, Minnesota

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jimenez, Antonio C.; Robichaud, Robi

    The U.S. Environmental Protection Agency (EPA) launched the RE-Powering America's Land initiative to encourage development of renewable energy on potentially contaminated land and mine sites. EPA collaborated with the U.S. Department of Energy's (DOE's) National Renewable Energy Laboratory (NREL) and the Mille Lacs Band of Chippewa Indians to evaluate the wind resource and examine the feasibility of a wind project at a contaminated site located on the Mille Lacs Indian Reservation in Minnesota. The wind monitoring effort involved the installation of a 60-m met tower and the collection of 18 months of wind data at multiple heights above the ground.more » This report focuses on the wind resource assessment, the estimated energy production of wind turbines, and an assessment of the economic feasibility of a potential wind project sited this site.« less

  13. Disseminating relevant health information to underserved audiences: implications of the Digital Divide Pilot Projects*

    PubMed Central

    Kreps, Gary L.

    2005-01-01

    Objective: This paper examines the influence of the digital divide on disparities in health outcomes for vulnerable populations, identifying implications for medical and public libraries. Method: The paper describes the results of the Digital Divide Pilot Projects demonstration research programs funded by the National Cancer Institute to test new strategies for disseminating relevant health information to underserved and at-risk audiences. Results: The Digital Divide Pilot Projects field-tested innovative systemic strategies for helping underserved populations access and utilize relevant health information to make informed health-related decisions about seeking appropriate health care and support, resisting avoidable and significant health risks, and promoting their own health. Implications: The paper builds on the Digital Divide Pilot Projects by identifying implications for developing health communication strategies that libraries can adopt to provide digital health information to vulnerable populations. PMID:16239960

  14. Active pulmonary tuberculosis case detection and treatment among floating population in China: an effective pilot.

    PubMed

    Li, Xinxu; Zhang, Hui; Jiang, Shiwen; Wang, Jia; Liu, Xiaoqiu; Li, Weibin; Yao, Hongyan; Wang, Lixia

    2010-12-01

    China has more and more floating population because of reform and opening-up. As one of the high burden countries in tuberculosis (TB) control in the world, China has to face more challenges about the TB case detection and treatment among floating population in China. Aim to evaluate the effect of case detection and treatment of the Floating Population TB Control Pilot Project from Global Fund Round Five (GFR5) TB Control Program in China. During October 2006 to September 2008, the pilot project was implemented gradually in 60 counties in Tianjin, Shanghai, Jiangsu, Zhejiang, Fujian, Shandong and Guangdong. All quarterly reports of the pilot project were collected, and these materials were summarized and analyzed. In seven coastal provinces, 19,584 active pulmonary TB (PTB) cases were registered among floating population in 2 years. Among the active PTB cases, 87.2% were 15-45 years old, and 62.8% were male. In second year, 15,629 active PTB cases were registered, and the overall registration rate was 68 per 100,000 people. DOT treatments were provided for 18,125 active PTB cases in 2 years, and overall DOT treatment rate was 92.6%. There were 3,955 active PTB cases registered in first year, and the overall cure rate was 86.0%. Through the implementation of the pilot project, the TB case detection and treatment among floating population have been enhanced in pilot areas of China. The useful experience and results from the pilot project have been being gradually generalized nationally.

  15. Harnessing the power of enhanced data for healthcare quality improvement: lessons from a Minnesota Hospital Association Pilot Project.

    PubMed

    Pine, Michael; Sonneborn, Mark; Schindler, Joe; Stanek, Michael; Maeda, Jared Lane; Hanlon, Carrie

    2012-01-01

    The imperative to achieve quality improvement and cost-containment goals is driving healthcare organizations to make better use of existing health information. One strategy, the construction of hybrid data sets combining clinical and administrative data, has strong potential to improve the cost-effectiveness of hospital quality reporting processes, improve the accuracy of quality measures and rankings, and strengthen data systems. Through a two-year contract with the Agency for Healthcare Research and Quality, the Minnesota Hospital Association launched a pilot project in 2007 to link hospital clinical information to administrative data. Despite some initial challenges, this project was successful. Results showed that the use of hybrid data allowed for more accurate comparisons of risk-adjusted mortality and risk-adjusted complications across Minnesota hospitals. These increases in accuracy represent an important step toward targeting quality improvement efforts in Minnesota and provide important lessons that are being leveraged through ongoing projects to construct additional enhanced data sets. We explore the implementation challenges experienced during the Minnesota Pilot Project and their implications for hospitals pursuing similar data-enhancement projects. We also highlight the key lessons learned from the pilot project's success.

  16. 76 FR 30384 - Notice of Intent To Prepare a Draft Environmental Impact Statement for a Proposed Habitat...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-25

    ... includes the operation of 355 existing wind turbine generators during the first three phases of the project... of up to 448 wind turbines. The project would also include all associated collector lines, access... areas and concrete batch plants, if applicable. Up to five different models of wind turbines may be in...

  17. 75 FR 22129 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-27

    ... manufactured wind turbine to be installed at its existing wastewater treatment facility site. This is a project... consulting engineer, it has been determined that there are currently no domestic manufactured wind turbines... manufactured wind turbine by the Town of Falmouth, MA, as specified in its February 24, 2010 follow-up...

  18. 75 FR 42767 - Preparation of an Environmental Impact Statement for Issuance of an Incidental Take Permit and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-22

    ... Power Project Overview Beech Ridge Energy LLC is developing a wind power project in Greenbrier and... permanent width of 4.9 m (16 ft). (2) A power collection system delivers power generated by the wind... bat, as well as unlisted bats and birds; (2) relevant data concerning wind power and bat and bird...

  19. 75 FR 59158 - Earth Day Commitment/Friends of the Coast, Beyond Nuclear, Seacoast Anti-Pollution League, C-10...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-27

    ... state that active proposals for more than 3,000 megawatts of wind power are currently on the books in... projected over 20 years what wind power will then be available, in part because wind power projects are... public about the connections between nuclear power and nuclear weapons. Beyond Nuclear has members who...

  20. 76 FR 41815 - Notice of Intent To Prepare an Environmental Impact Statement for the enXco Development...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-15

    ... proposed project would include 34 wind turbines, access roads, and a 34.5 kV energy collection line on 1... Tylerhorse Wind Project, Kern County, CA, and Possible Land Use Plan Amendment; CACA 51561 AGENCY: Bureau of...'s (Applicant or Power Partners) right-of-way (ROW) authorization request for the Tylerhorse Wind...

  1. 76 FR 13613 - Supplemental Notice of Technical Conference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-14

    ... Officer, Tonbridge Power, Inc. [rtarr8] Tyson Utt, Project Manager, Horizon Wind Energy LLC [rtarr8... Conference Docket No. Priority Rights to New Participant- AD11-11-000 Funded Transmission. Alta Wind I, LLC EL10-62-000 Alta Wind II, LLC Alta Wind III, LLC Alta Wind IV, LLC Alta Wind V, LLC Alta Wind VI, LLC...

  2. Alert generation and cockpit presentation for an integrated microburst alerting system

    NASA Technical Reports Server (NTRS)

    Wanke, Craig; Hansman, R. John, Jr.

    1991-01-01

    Alert generation and cockpit presentation issues for low level wind shear (microburst) alerts are investigated. Alert generation issues center on the development of a hazard criterion which allows integration of both ground based and airborne wind shear detection systems to form an accurate picture of the aviation hazard posed by a particular wind shear situation. A methodology for the testing of a hazard criteria through flight simulation has been developed, and has been used to examine the effectiveness and feasibility of several possible criteria. Also, an experiment to evaluate candidate graphical cockpit displays for microburst alerts using a piloted simulator has been designed.

  3. Skate Genome Project: Cyber-Enabled Bioinformatics Collaboration

    PubMed Central

    Vincent, J.

    2011-01-01

    The Skate Genome Project, a pilot project of the North East Cyber infrastructure Consortium, aims to produce a draft genome sequence of Leucoraja erinacea, the Little Skate. The pilot project was designed to also develop expertise in large scale collaborations across the NECC region. An overview of the bioinformatics and infrastructure challenges faced during the first year of the project will be presented. Results to date and lessons learned from the perspective of a bioinformatics core will be highlighted.

  4. Will surface winds weaken in response to global warming?

    NASA Astrophysics Data System (ADS)

    Ma, Jian; Foltz, Gregory R.; Soden, Brian J.; Huang, Gang; He, Jie; Dong, Changming

    2016-12-01

    The surface Walker and tropical tropospheric circulations have been inferred to slow down from historical observations and model projections, yet analysis of large-scale surface wind predictions is lacking. Satellite measurements of surface wind speed indicate strengthening trends averaged over the global and tropical oceans that are supported by precipitation and evaporation changes. Here we use corrected anemometer-based observations to show that the surface wind speed has not decreased in the averaged tropical oceans, despite its reduction in the region of the Walker circulation. Historical simulations and future projections for climate change also suggest a near-zero wind speed trend averaged in space, regardless of the Walker cell change. In the tropics, the sea surface temperature pattern effect acts against the large-scale circulation slow-down. For higher latitudes, the surface winds shift poleward along with the eddy-driven mid-latitude westerlies, resulting in a very small contribution to the global change in surface wind speed. Despite its importance for surface wind speed change, the influence of the SST pattern change on global-mean rainfall is insignificant since it cannot substantially alter the global energy balance. As a result, the precipitation response to global warming remains ‘muted’ relative to atmospheric moisture increase. Our results therefore show consistency between projections and observations of surface winds and precipitation.

  5. FINAL REPORT WIND POWER WARM SPRINGS RESERVATION TRIBAL LANDS DOE GRANT NUMBER DE-FG36-07GO17077 SUBMITTED BY WARM SPRINGS POWER & WATER ENTERPRISES A CORPORATE ENTITY OF THE CONFEDERATED TRIBES OF WARM SPRINGS WARM SPRINGS, OREGON

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jim Manion; Michael Lofting; Wil Sando

    2009-03-30

    Wind Generation Feasibility Warm Springs Power and Water Enterprises (WSPWE) is a corporate entity owned by the Confederated Tribes of the Warm Springs Reservation, located in central Oregon. The organization is responsible for managing electrical power generation facilities on tribal lands and, as part of its charter, has the responsibility to evaluate and develop renewable energy resources for the Confederated Tribes of Warm Springs. WSPWE recently completed a multi-year-year wind resource assessment of tribal lands, beginning with the installation of wind monitoring towers on the Mutton Mountains site in 2003, and collection of on-site wind data is ongoing. The studymore » identified the Mutton Mountain site on the northeastern edge of the reservation as a site with sufficient wind resources to support a commercial power project estimated to generate over 226,000 MWh per year. Initial estimates indicate that the first phase of the project would be approximately 79.5 MW of installed capacity. This Phase 2 study expands and builds on the previously conducted Phase 1 Wind Resource Assessment, dated June 30, 2007. In order to fully assess the economic benefits that may accrue to the Tribes through wind energy development at Mutton Mountain, a planning-level opinion of probable cost was performed to define the costs associated with key design and construction aspects of the proposed project. This report defines the Mutton Mountain project costs and economics in sufficient detail to allow the Tribes to either build the project themselves or contract with a developer under the most favorable terms possible for the Tribes.« less

  6. Applying value sensitive design (VSD) to wind turbines and wind parks: an exploration.

    PubMed

    Oosterlaken, Ilse

    2015-04-01

    Community acceptance still remains a challenge for wind energy projects. The most popular explanation for local opposition, the Not in My Backyard effect, has received fierce criticism in the past decade. Critics argue that opposition is not merely a matter of selfishness or ignorance, but that moral, ecological and aesthetic values play an important role. In order to better take such values into account, a more bottom-up, participatory decision process is usually proposed. Research on this topic focusses on either stakeholder motivations/attitudes, or their behavior during project implementation. This paper proposes a third research focus, namely the 'objects' which elicit certain behavioral responses and attitudes-the wind turbine and parks. More concretely, this paper explores Value Sensitive Design (VSD) as way to arrive at wind turbines and parks that better embed or reflect key values. After a critical discussion of the notion of acceptance versus acceptability and support, the paper discusses existing literature on ecology and aesthetics in relation to wind turbine/park design, which could serve as 'building blocks' of a more integral VSD approach of the topic. It also discusses the challenge of demarcating wind park projects as VSD projects. A further challenge is that VSD has been applied mainly at the level of technical artifacts, whereas wind parks can best be conceptualized as socio-technical system. This new application would therefore expand the current practice of VSD, and may as a consequence also lead to interesting new insights for the VSD community. The paper concludes that such an outcome-oriented approach of wind turbines and park is worth exploring further, as a supplement to rather than a replacement of the process-oriented approach that is promoted by the current literature on community acceptance of wind parks.

  7. Geometeorological data collected by the USGS Desert Winds Project at Gold Spring, Great Basin desert, northeastern Arizona, 1979-1992

    USGS Publications Warehouse

    Helm, P.J.; Breed, C.S.; Tigges, R.K.; Garcia, P.A.

    1995-01-01

    The primary purpose of the Desert Winds Project (DWP) is to obtain high-resolution meteorological data and related surface geological and vegetation data for natural (e.g., uncultivated) desert sites where wind is or has been a major erosive or depositional force. The objectives are twofold: (1) to provide the detailed field measurements needed to carry out quantitative studies of wind as an agent of surface geologic change; and (2) to establish a baseline for defining the 'normal' range of climatic conditions that can be expected to occur on a decadal time scale, in areas considered representative of the major American deserts. The Gold Spring locality was selected to represent that part of the Great Basin Desert that extends into northeastern Arizona. The long-term goal for acquiring and analyzing the Desert Winds Project data is to use them to address problems of land resource degradation by wind, whether resulting from climatic variation aridification) or human activities (desertification), or both (see techinfo.doc).

  8. 2015 Wind Technologies Market Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wiser, Ryan; Bolinger, Mark; Barbose, Galen

    This annual report--now in its tenth year--provides a detailed overview of developments and trends in the U.S. wind power market, with a particular focus on 2015. The report begins with an overview of key installation trends and then covers an array of industry and technology trends. The report also discusses project performance, wind turbine prices, project costs, operations and maintenance expenses, and prices paid for wind power in the United States. The report examines policy and market factors impacting the domestic wind power market and provides a preview of possible near-term market developments, expenses, and prices paid for wind powermore » in the United States. The report examines policy and market factors impacting the domestic wind power market and provides a preview of possible near-term market developments.« less

  9. Job Sharing Pilot Project in the Department of Education: Final Evaluation. A Report to the Legislature of the State of Hawaii. No. 81-10.

    ERIC Educational Resources Information Center

    Tanimura, Clinton T.

    Evaluation of a three-year pilot project in the Hawaii Department of Education focused on the extent to which it demonstrated the feasibility of job sharing as an employment alternative for classroom teachers. It also assessed project effectiveness, examined costs incurred by the project, and analyzed job sharing as a permanent employment option…

  10. Effect of motion cues during complex curved approach and landing tasks: A piloted simulation study

    NASA Technical Reports Server (NTRS)

    Scanlon, Charles H.

    1987-01-01

    A piloted simulation study was conducted to examine the effect of motion cues using a high fidelity simulation of commercial aircraft during the performance of complex approach and landing tasks in the Microwave Landing System (MLS) signal environment. The data from these tests indicate that in a high complexity MLS approach task with moderate turbulence and wind, the pilot uses motion cues to improve path tracking performance. No significant differences in tracking accuracy were noted for the low and medium complexity tasks, regardless of the presence of motion cues. Higher control input rates were measured for all tasks when motion was used. Pilot eye scan, as measured by instrument dwell time, was faster when motion cues were used regardless of the complexity of the approach tasks. Pilot comments indicated a preference for motion. With motion cues, pilots appeared to work harder in all levels of task complexity and to improve tracking performance in the most complex approach task.

  11. Comparison of two head-up displays in simulated standard and noise abatement night visual approaches

    NASA Technical Reports Server (NTRS)

    Cronn, F.; Palmer, E. A., III

    1975-01-01

    Situation and command head-up displays were evaluated for both standard and two segment noise abatement night visual approaches in a fixed base simulation of a DC-8 transport aircraft. The situation display provided glide slope and pitch attitude information. The command display provided glide slope information and flight path commands to capture a 3 deg glide slope. Landing approaches were flown in both zero wind and wind shear conditions. For both standard and noise abatement approaches, the situation display provided greater glidepath accuracy in the initial phase of the landing approaches, whereas the command display was more effective in the final approach phase. Glidepath accuracy was greater for the standard approaches than for the noise abatement approaches in all phases of the landing approach. Most of the pilots preferred the command display and the standard approach. Substantial agreement was found between each pilot's judgment of his performance and his actual performance.

  12. F-18 chase craft with NASA test pilots Schneider and Fulton

    NASA Technical Reports Server (NTRS)

    1992-01-01

    Ed Schneider, (left), is the project pilot for the F-18 High Angle of Attack program at NASA's Dryden Flight Research Center, Edwards, California. He has been a NASA research pilot at Dryden since 1983. In addition to his assignment with the F-18 High Angle of Attack program, Schneider is a project pilot for the F-15B aeronautical research aircraft, the NASA NB-52B launch aircraft, and the SR-71 'Blackbird' aircraft. He is a Fellow and was the 1994 President of the Society of Experimental Test Pilots. In 1996 he was awarded the NASA Exceptional Service Medal. Schneider is seen here with Fitzhugh L. Fulton Jr., (right), who was a civilian research pilot at Dryden. from August 1, 1966, until July 3, 1986, following 23 years of service as a pilot in the U.S. Air Force. Fulton was the project pilot on all early tests of the 747 Shuttle Carrier Aircraft (SCA) used to air launch the Space Shuttle prototype Enterprise in the Approach and Landing Tests (ALT) at Dryden in l977. For his work in the ALT program, Fulton received NASA's Exceptional Service Medal. He also received the Exceptional Service Medal again in 1983 for flying the 747 SCA during the European tour of the Space Shuttle Enterprise. During his career at Dryden, Fulton was project pilot on NASA's NB-52B launch aircraft used to air launch a variety of piloted and unpiloted research aircraft, including the X-15s and lifting bodies. He flew the XB-70 prototype supersonic bomber on both NASA-USAF tests and NASA research flights during the late 1960s, attaining speeds exceeding Mach 3. He was also a project pilot on the YF-12A and YF-12C research program from April 14, 1969, until September 25, 1978. The F/A-18 Hornet seen behind them is used primarily as a safety chase and support aircraft at NASA's Dryden Flight Research Center, Edwards, Calif. As support aircraft, the F-18's are used for safety chase, pilot proficiency and aerial photography. As a safety chase aircraft, F-18's, flown by research pilots, accompany research missions as another 'set of eyes' to visually observe the research event, experiment or test to help make sure the flights are carried out safely. The 'chase' pilots are in constant communication with the research pilots and mission control to report abnormalities that may be seen from the support aircraft. Pilots must also stay proficient by flying a certain number of missions per month. F-18's are used for this. A two-seat support aircraft is also used when research missions require an engineer or photographer on the flights.

  13. Income Verification Pilot Project (Phase II): Results of Quality Assurance Evaluation, 1982-83 School Year.

    ERIC Educational Resources Information Center

    Applied Management Sciences, Inc., Silver Spring, MD.

    Presented in this report are selected findings of the Income Verification Pilot Project (IVPP), an investigation examining misreporting of applicant income and family size on applications for government-sponsored school meal benefits. As reported here, Phase II of the project provided for a comprehensive assessment of specific quality assurance…

  14. Statistics on Science and Technology in Latin America, Experience with UNESCO Pilot Projects, 1972-1974.

    ERIC Educational Resources Information Center

    Thebaud, Schiller

    This report examines four UNESCO pilot projects undertaken in 1972 in Brazil, Colombia, Peru, and Uruguay to study the methods used for national statistical surveys of science and technology. The projects specifically addressed the problems of comparing statistics gathered by different methods in different countries. Surveys carried out in Latin…

  15. Pilot Test of the Online Public Access Catalog Project's User and Nonuser Questionnaires. Final Report.

    ERIC Educational Resources Information Center

    Markey, Karen

    This report describes the pilot data collections and post-questionnaire interview activities of the Council on Library Resources (CLR)/Online Computer Library Center (OCLC) Online Public Access Project. The background of the project is briefly described, the purpose and adminstration of the post-questionnaire interviews are outlined, and pilot…

  16. NGA/ACT Pilot Project: Increasing Course Rigor. Final Report

    ERIC Educational Resources Information Center

    ACT, Inc., 2008

    2008-01-01

    The Increasing Course Rigor Pilot Project, a joint initiative of the National Governors Association (NGA) Center for Best Practices and ACT, Inc., is one component of Phase Two of the NGA Center for Best Practices Honor States Grant Program. The project, which began in winter 2006 and concluded in summer 2007, was designed to improve the quality…

  17. Environmental Assessment Expanded Ponnequin Wind Energy Project Weld County, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    N /A

    1999-03-02

    The U.S.Department of Energy (DOE) has considered a proposal from the State of Colorado, Office of Energy Conservation (OEC), for funding construction of the Expanded Ponnequin Wind Project in Weld County, Colorado. OEC plans to enter into a contracting arrangement with Public Service Company of Colorado (PSCO) for the completion of these activities. PSCo, along with its subcontractors and business partners, are jointly developing the Expanded Ponnequin Wind Project. DOE completed an environmental assessment of the original proposed project in August 1997. Since then, the geographic scope and the design of the project changed, necessitating additional review of the projectmore » under the National Environmental Policy Act. The project now calls for the possible construction of up to 48 wind turbines on State and private lands. PSCo and its partners have initiated construction of the project on private land in Weld County, Colorado. A substation, access road and some wind turbines have been installed. However, to date, DOE has not provided any funding for these activities. DOE, through its Commercialization Ventures Program, has solicited applications for financial assistance from state energy offices, in a teaming arrangement with private-sector organizations, for projects that will accelerate the commercialization of emerging renewable energy technologies. The Commercialization Ventures Program was established by the Renewable Energy and Energy Efficiency Technology Competitiveness Act of 1989 (P.L. 101-218) as amended by the Energy Policy Act of 1992 (P.L. 102-486). The Program seeks to assist entry into the marketplace of newly emerging renewable energy technologies, or of innovative applications of existing technologies. In short, an emerging renewable energy technology is one which has already proven viable but which has had little or no operational experience. The Program is managed by the Department of Energy, Office of Energy Efficiency and Renewable Energy. The Federal action triggering the preparation of this EA is the need for DOE to decide whether to release the requested funding to support the construction of the Expanded Ponnequin Wind Project. The purpose of this Final Environmental Assessment (EA) is to provide DOE and the public with information on potential environmental impacts associated with the Expanded Ponnequin Wind Energy Project. This EA, and public comments received on it, were used in DOE's deliberations on whether to release funding for the expanded project under the Commercialization Ventures Program.« less

  18. Wind energy developments in the 20th century

    NASA Technical Reports Server (NTRS)

    Vargo, D. J.

    1974-01-01

    Wind turbine systems for generating electrical power have been tested in many countries. Representative examples of turbines which have produced from 100 to 1250 kW are described. The advantages of wind energy consist of its being a nondepleting, nonpolluting, and free fuel source. Its disadvantages relate to the variability of wind and the high installation cost per kilowatt of capacity of wind turbines when compared to other methods of electric-power generation. High fuel costs and potential resource scarcity have led to a five-year joint NASA-NSF program to study wind energy. The program will study wind energy conversion and storage systems with respect to cost effectiveness, and will attempt to estimate national wind-energy potential and develop techniques for generator site selection. The studies concern a small-systems (50-250 kW) project, a megawatt-systems (500-3000 kW) project, supporting research and technology, and energy storage. Preliminary economic analyses indicate that wind-energy conversion can be competitive in high-average-wind areas.

  19. 78 FR 56729 - Final Environmental Impact Statement, Habitat Conservation Plan, and Implementing Agreement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-13

    ..., maintenance, and decommissioning of the Beech Ridge Wind Power Project. Beech Ridge Energy is requesting a 25... of 67 existing turbines in the project area; the construction, operation, and maintenance of up to 33... Wind Power Project, Greenbrier and Nicholas Counties, West Virginia AGENCY: Fish and Wildlife Service...

  20. Saturn Apollo Program

    NASA Image and Video Library

    1969-11-23

    Sitting on the lunar surface, this Solar Wind Spectrometer is measuring the energies of the particles that make up the solar wind. This was one of the instruments used during the Apollo 12 mission. The second manned lunar landing mission, Apollo 12 launched from launch pad 39-A at Kennedy Space Center in Florida on November 14, 1969 via a Saturn V launch vehicle. The Saturn V vehicle was developed by the Marshall Space Flight Center (MSFC) under the direction of Dr. Wernher von Braun. Aboard Apollo 12 was a crew of three astronauts: Alan L. Bean, pilot of the Lunar Module (LM), Intrepid; Richard Gordon, pilot of the Command Module (CM), Yankee Clipper; and Spacecraft Commander Charles Conrad. The LM, Intrepid, landed astronauts Conrad and Bean on the lunar surface in what’s known as the Ocean of Storms while astronaut Richard Gordon piloted the CM, Yankee Clipper, in a parking orbit around the Moon. Lunar soil activities included the deployment of the Apollo Lunar Surface Experiments Package (ALSEP), finding the unmanned Surveyor 3 that landed on the Moon on April 19, 1967, and collecting 75 pounds (34 kilograms) of rock samples. Apollo 12 safely returned to Earth on November 24, 1969.

  1. Airplane takeoff and landing performance monitoring system

    NASA Technical Reports Server (NTRS)

    Middleton, David B. (Inventor); Srivatsan, Raghavachari (Inventor); Person, Jr., Lee H. (Inventor)

    1991-01-01

    The invention is a real-time takeoff and landing performance monitoring system for an aircraft which provides a pilot with graphic and metric information to assist in decisions related to achieving rotation speed (V.sub.R) within the safe zone of a runway, or stopping the aircraft on the runway after landing or take-off abort. The system processes information in two segments: a pretakeoff segment and a real-time segment. One-time inputs of ambient conditions and airplane configuration information are used in the pretakeoff segment to generate scheduled performance data. The real-time segment uses the scheduled performance data, runway length data and transducer measured parameters to monitor the performance of the airplane throughout the takeoff roll. Airplane and engine performance deficiencies are detected and annunciated. A novel and important feature of this segment is that it updates the estimated runway rolling friction coefficient. Airplane performance predictions also reflect changes in head wind occurring as the takeoff roll progresses. The system provides a head-down display and a head-up display. The head-up display is projected onto a partially reflective transparent surface through which the pilot views the runway. By comparing the present performance of the airplane with a predicted nominal performance based upon given conditions, performance deficiencies are detected by the system.

  2. Winnebago Resource Study. Cooperative Research and Development Final Report, CRADA Number CRD-09-329

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jimenez, A.; Robichaud, R.

    2015-03-01

    Since 2005 the NREL Native American Tall Tower Loan program has assisted Native American tribes to assess their wind resource by lending tall (30m - 50m) anemometer. This program has allowed tribes a lower risk way to gather financeable wind data for potential utility scale wind energy projects. These projects offer Tribes a significant economic development opportunity.

  3. 75 FR 8348 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-24

    ... (``MWRA'') for the purchase of a 1.5 megawatt (MW) foreign manufactured wind turbine for the DeLauri Pump... domestically manufactured wind turbine available or one that can be supplied to meet its proposed project... action permits the purchase of a foreign manufactured 1.5 MW wind turbine by the MWRA, as specified in...

  4. A Vision in Aeronautics: The K-12 Wind Tunnel Project

    NASA Technical Reports Server (NTRS)

    1997-01-01

    A Vision in Aeronautics, a project within the NASA Lewis Research Center's Information Infrastructure Technologies and Applications (IITA) K-12 Program, employs small-scale, subsonic wind tunnels to inspire students to explore the world of aeronautics and computers. Recently, two educational K-12 wind tunnels were built in the Cleveland area. During the 1995-1996 school year, preliminary testing occurred in both tunnels.

  5. Applications of the Remotely Piloted Aircraft (RPA) 'MASC' in Atmospheric Boundary Layer Research

    NASA Astrophysics Data System (ADS)

    Wildmann, Norman; Platis, Andreas; Tupman, David-James; Bange, Jens

    2015-04-01

    The remotely piloted aircraft (RPA) MASC (Multipurpose Airborne Sensor Carrier) was developed at the University of Tübingen in cooperation with the University of Stuttgart, University of Applied Sciences Ostwestfalen-Lippe and 'ROKE-Modelle'. Its purpose is the investigation of thermodynamic processes in the atmospheric boundary layer (ABL), including observations of temperature, humidity and wind profiles, as well as the measurement of turbulent heat, moisture and momentum fluxes. The aircraft is electrically powered, has a maximum wingspan of 3.40~m and a total weight of 5-8~kg, depending on the battery- and payload. The standard meteorological payload consists of two temperature sensors, a humidity sensor, a flow probe, an inertial measurement unit and a GNSS. The sensors were optimized for the resolution of small-scale turbulence down to length scales in the sub-meter range. In normal operation, the aircraft is automatically controlled by the ROCS (Research Onboard Computer System) autopilot to be able to fly predefined paths at constant altitude and airspeed. Only take-off and landing are carried out by a human RC pilot. Since 2012, the system is operational and has since then been deployed in more than ten measurement campaigns, with more than 100 measurement flights. The fields of research that were tackled in these campaigns include sensor validation, fundamental boundary-layer research and wind-energy research. In 2014, for the first time, two MASC have been operated at the same time within a distance of a few kilometres, in order to investigate the wind field over an escarpment in the Swabian Alb. Furthermore, MASC was first deployed off-shore in October 2014, starting from the German island Heligoland in the North Sea, for the purpose of characterization of the marine boundary layer for offshore wind parks. Detailed descriptions of the experimental setup and first preliminary results will be presented.

  6. EU-Norsewind Using Envisat ASAR And Other Data For Offshore Wind Atlas

    NASA Astrophysics Data System (ADS)

    Hasager, Charlotte B.; Mouche, Alexis; Badger, Merete

    2010-04-01

    The EU project NORSEWIND - short for Northern Seas Wind Index Database - www.norsewind.eu has the aim to produce state-of-the-art wind atlas for the Baltic, Irish and North Seas using ground-based lidar, meteorological masts, satellite data and mesoscale modelling. So far CLS and Risø DTU have collected Envisat ASAR images for the area of interest and the first results: maps of wind statistics, Weibull scale and shape parameters, mean and energy density are presented. The results will be compared to a distributed network of high-quality in-situ observations and mesoscale model results during 2009-2011 as the in-situ data and model results become available. Wind energy is proportional with wind speed to the third power, thus even small improvements on wind speed mapping are important in this project. One challenge is to arrive at hub-height winds ~100 m above sea level.

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Huskey, A.; Bowen, A.; Jager, D.

    This test was conducted as part of the U.S. Department of Energy's (DOE) Independent Testing project. This project was established to help reduce the barriers to wind energy expansion by providing independent testing results for small wind turbines (SWT). In total, five turbines were tested at the National Wind Technology Center (NWTC) as a part of this project. Safety and function testing is one of up to five tests performed on the turbines, including power performance, duration, noise, and power-quality tests. NWTC testing results provide manufacturers with reports that may be used to meet part of small wind turbine certificationmore » requirements. The test equipment includes a Mariah Windspire wind turbine mounted on a monopole tower. L&E Machine manufactured the turbine in the United States. The inverter was manufactured separately by Technology Driven Products in the United States. The system was installed by the NWTC site operations group with guidance and assistance from Mariah Power.« less

  8. Brownfields Allen-Morrison Project: Technical Memorandum on Creating Inventory of Materials that can be Reused or Recycled through Deconstruction

    EPA Pesticide Factsheets

    This technical memorandum presents sustainability pilot activities, a summary of inventory results, and other observations and recommendations for sustainable redevelopment identified during the pilot activities at the brownfields projects.

  9. Linking: Today's Libraries, Tomorrow's Technologies. Report of the Bibliographic and Communications Network Pilot Project. Canadian Network Papers Number 7 = Le Lien entre les Bibliotheques d'Aujourd'hui et les Technologies de Demain. Rapport du Projet Pilote du Reseau de Services Bibliographiques et de Communications. Documents sur les Reseaux Canadiens Numero 7.

    ERIC Educational Resources Information Center

    National Library of Canada, Ottawa (Ontario).

    A pilot project was conducted from May 1980 to November 1983 to test the application of iNet--a decentralized, packet-switched telecommunications network--to bibliographic data interchange in Canada. The principal components of the project were participation of the Bibliographic Common Interest Group (BCIP), a group of libraries with stand-alone,…

  10. The 200-kilowatt wind turbine project

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The three 200 kilowatt wind turbines described, compose the first of three separate systems. Proposed wind turbines of the two other systems, although similar in design, are larger in both physical size and rated power generation. The overall objective of the project is to obtain early operation and performance data while gaining initial experience in the operation of large, horizontal-axis wind turbines in typical utility environments. Several of the key issues addressed include the following: (1) impact of the variable power output (due to varying wind speeds) on the utility grid (2) compatibility with utility requirements (voltage and frequency control of generated power) (3) demonstration of unattended, fail-safe operation (4) reliability of the wind turbine system (5) required maintenance and (6) initial public reaction and acceptance.

  11. United States Supports Distributed Wind Technology Improvements; NREL (National Renewable Energy Laboratory)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sinclair, Karin

    2015-06-15

    This presentation provides information on the activities conducted through the Competitiveness Improvement Project (CIP), initiated in 2012 by the U.S. Department of Energy (DOE) and executed through the National Renewable Energy Laboratory (NREL) to support the distributed wind industry. The CIP provides research and development funding and technical support to improve distributed wind turbine technology and increase the competitiveness of U.S. small and midsize wind turbine manufacturers. Through this project, DOE/NREL assists U.S. manufacturers to lower the levelized cost of energy of wind turbines through component improvements, manufacturing process upgrades, and turbine testing. Ultimately, this support is expected to leadmore » to turbine certification through testing to industry-recognized wind turbine performance and safety standards.« less

  12. Safety and Function Test Report for the Viryd CS8 Wind Turbine

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roadman, J.; Murphy, M.; van Dam, J.

    2013-10-01

    This test was conducted as part of the U.S. Department of Energy's (DOE) Independent Testing project. This project was established to help reduce the barriers of wind energy expansion by providing independent testing results for small turbines. Several turbines were selected for testing at the National Wind Technology Center (NWTC) at the National Renewable Energy Laboratory (NREL) as a part of the Small Wind Turbine Independent Testing project. Safety and function testing is one of up to five tests that may be performed on the turbines. Other tests include duration, power performance, acoustic noise, and power quality. Viryd Technologies, Inc.more » of Austin, Texas, was the recipient of the DOE grant and provided the turbine for testing.« less

  13. Evaluating wind extremes in CMIP5 climate models

    NASA Astrophysics Data System (ADS)

    Kumar, Devashish; Mishra, Vimal; Ganguly, Auroop R.

    2015-07-01

    Wind extremes have consequences for renewable energy sectors, critical infrastructures, coastal ecosystems, and insurance industry. Considerable debates remain regarding the impacts of climate change on wind extremes. While climate models have occasionally shown increases in regional wind extremes, a decline in the magnitude of mean and extreme near-surface wind speeds has been recently reported over most regions of the Northern Hemisphere using observed data. Previous studies of wind extremes under climate change have focused on selected regions and employed outputs from the regional climate models (RCMs). However, RCMs ultimately rely on the outputs of global circulation models (GCMs), and the value-addition from the former over the latter has been questioned. Regional model runs rarely employ the full suite of GCM ensembles, and hence may not be able to encapsulate the most likely projections or their variability. Here we evaluate the performance of the latest generation of GCMs, the Coupled Model Intercomparison Project phase 5 (CMIP5), in simulating extreme winds. We find that the multimodel ensemble (MME) mean captures the spatial variability of annual maximum wind speeds over most regions except over the mountainous terrains. However, the historical temporal trends in annual maximum wind speeds for the reanalysis data, ERA-Interim, are not well represented in the GCMs. The historical trends in extreme winds from GCMs are statistically not significant over most regions. The MME model simulates the spatial patterns of extreme winds for 25-100 year return periods. The projected extreme winds from GCMs exhibit statistically less significant trends compared to the historical reference period.

  14. Statistics from the Operation of the Low-Level Wind Shear Alert System (LLWAS) during the Joint Airport Weather Studies (JAWS) Project.

    DTIC Science & Technology

    1984-12-01

    AD-RI59 367 STATISTICS FROM THE OPERATION OF THE LOW-LEVEL WIND I/i SHEAR ALERT SYSTEM (L..(U) NATIONAL CENTER FOR ATOMSPHERIC RESEARCH BOULDER CO...NATIONAL BUREAU OF STANDARDS-1963A % % Oh b DOT/FAAIPM-84132 Statistics from the Operation of the Program Engineering Low-Level Wind Shear Alert System and...The Operation of The Low-Level Wind December 1984 Shear Alert System (LLWAS) During The JAWS Project: 6. Performing Organization Code An Interim Report

  15. 75 FR 47301 - Cedro Hill Wind LLC; Butler Ridge Wind Energy Center, LLC; High Majestic Wind Energy Center, LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-05

    ...- 000; EG10-34-000; EG10-34-000; EG10-35-000; EG10-36-000; EG10-37-000; EG10-38-000] Cedro Hill Wind LLC; Butler Ridge Wind Energy Center, LLC; High Majestic Wind Energy Center, LLC; Wessington Wind Energy Center, LLC; Juniper Canyon Wind Power LLC; Loraine Windpark Project, LLC; White Oak Energy LLC; Meadow...

  16. Assistive Solutions in Practice: Experiences from AAL Pilot Regions in Austria.

    PubMed

    Ates, Nesrin; Aumayr, Georg; Drobics, Mario; Förster, Kristina Maria; Frauenberger, Christopher; Garschall, Markus; Kofler, Manfred; Krainer, Daniela; Kropf, Johannes; Majcen, Kurt; Oberzaucher, Johannes; Piazolo, Felix; Rzepka, Angelika; Sauskojus, Julia; Schneider, Cornelia; Stainer-Hochgatterer, Andreas; Sturm, Nadine; Waibel, Uli; Willner, Viktoria

    2017-01-01

    Since 2012 six AAL pilot regions were launched in Austria. The main goal of these pilot regions is to evaluate the impact of AAL technologies in daily use considering the entire value chain. Additionally, go-to market strategies for assistive technologies based on an involvement of all relevant stakeholders are developed. Within this paper an overview of the specific objectives, approaches and the status of all Austrian AAL pilot regions is given. Taking into account the different experiences of the different pilot regions, specific challenges in establishing, implementing and sustaining pilot region projects are discussed and lessons-learned are presented. Results show that a careful planning of all project phases taking into account available resources is crucial for the successful implementation of an AAL pilot region. In particular, this applies to all activities related to the active involvement of end-users.

  17. Synthesis and Comparison of Baseline Avian and Bat Use, Raptor Nesting and Mortality Information from Proposed and Existing Wind Developments: Final Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Erickson, Wallace P.

    2002-12-01

    Primarily due to concerns generated from observed raptor mortality at the Altamont Pass (CA) wind plant, one of the first commercial electricity generating wind plants in the U.S., new proposed wind projects both within and outside of California have received a great deal of scrutiny and environmental review. A large amount of baseline and operational monitoring data have been collected at proposed and existing U.S. wind plants. The primary use of the avian baseline data collected at wind developments has been to estimate the overall project impacts (e.g., very low, low, moderate, and high relative mortality) on birds, especially raptorsmore » and sensitive species (e.g., state and federally listed species). In a few cases, these data have also been used for guiding placement of turbines within a project boundary. This new information has strengthened our ability to accurately predict and mitigate impacts from new projects. This report should assist various stakeholders in the interpretation and use of this large information source in evaluating new projects. This report also suggests that the level of baseline data (e.g., avian use data) required to adequately assess expected impacts of some projects may be reduced. This report provides an evaluation of the ability to predict direct impacts on avian resources (primarily raptors and waterfowl/waterbirds) using less than an entire year of baseline avian use data (one season, two seasons, etc.). This evaluation is important because pre-construction wildlife surveys can be one of the most time-consuming aspects of permitting wind power projects. For baseline data, this study focuses primarily on standardized avian use data usually collected using point count survey methodology and raptor nest survey data. In addition to avian use and raptor nest survey data, other baseline data is usually collected at a proposed project to further quantify potential impacts. These surveys often include vegetation mapping and state or federal sensitive-status wildlife and plant surveys if there is a likelihood of these species occurring in the vicinity of the project area. This report does not address these types of surveys, however, it is assumed in this document that those surveys are conducted when appropriate to help further quantify potential impacts. The amount and extent of ecological baseline data to collect at a wind project should be determined on a case-by-case basis. The decision should use information gained from this report, recent information from new projects (e.g., Stateline OR/WA), existing project site data from agencies and other knowledgeable groups/individuals, public scoping, and results of vegetation and habitat mapping. Other factors that should also be considered include the likelihood of the presence of sensitive species at the site and expected impacts to those species, project size and project layout.« less

  18. The Future of Wind Energy in California: Future Projections in Variable-Resolution CESM

    NASA Astrophysics Data System (ADS)

    Wang, M.; Ullrich, P. A.; Millstein, D.; Collier, C.

    2017-12-01

    This study focuses on the wind energy characterization and future projection at five primary wind turbine sites in California. Historical (1980-2000) and mid-century (2030-2050) simulations were produced using the Variable-Resolution Community Earth System Model (VR-CESM) to analyze the trends and variations in wind energy under climate change. Datasets from Det Norske Veritas Germanischer Llyod (DNV GL), MERRA-2, CFSR, NARR, as well as surface observational data were used for model validation and comparison. Significant seasonal wind speed changes under RCP8.5 were detected from several wind farm sites. Large-scale patterns were then investigated to analyze the synoptic-scale impact on localized wind change. The agglomerative clustering method was applied to analyze and group different wind patterns. The associated meteorological background of each cluster was investigated to analyze the drivers of different wind patterns. This study improves the characterization of uncertainty around the magnitude and variability in space and time of California's wind resources in the near future, and also enhances understanding of the physical mechanisms related to the trends in wind resource variability.

  19. Spatial mapping and attribution of Wyoming wind turbines

    USGS Publications Warehouse

    O'Donnell, Michael S.; Fancher, Tammy S.

    2010-01-01

    This Wyoming wind-turbine data set represents locations of wind turbines found within Wyoming as of August 1, 2009. Each wind turbine is assigned to a wind farm. For each turbine, this report contains information about the following: potential megawatt output, rotor diameter, hub height, rotor height, land ownership, county, wind farm power capacity, the number of units currently associated with its wind farm, the wind turbine manufacturer and model, the wind farm developer, the owner of the wind farm, the current purchaser of power from the wind farm, the year the wind farm went online, and the status of its operation. Some attributes are estimates based on information that was obtained through the American Wind Energy Association and miscellaneous online reports. The locations are derived from August 2009 true-color aerial photographs made by the National Agriculture Imagery Program; the photographs have a positional accuracy of approximately ?5 meters. The location of wind turbines under construction during the development of this data set will likely be less accurate than the location of turbines already completed. The original purpose for developing the data presented here was to evaluate the effect of wind energy development on seasonal habitat used by greater sage-grouse. Additionally, these data will provide a planning tool for the Wyoming Landscape Conservation Initiative Science Team and for other wildlife- and habitat-related projects underway at the U.S. Geological Survey's Fort Collins Science Center. Specifically, these data will be used to quantify disturbance of the landscape related to wind energy as well as quantifying indirect disturbances to flora and fauna. This data set was developed for the 2010 project 'Seasonal predictive habitat models for greater sage-grouse in Wyoming.' This project's spatially explicit seasonal distribution models of sage-grouse in Wyoming will provide resource managers with tools for conservation planning. These specific data are being used for assessing the effect of disturbance resulting from wind energy development within Wyoming on sage-grouse populations.

  20. 76 FR 40725 - Approval of Outer Continental Shelf (OCS) Permit Issued to Cape Wind Associates, LLC (EPA Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-11

    ... Cape Wind Associates, LLC (Cape Wind). The OCS permit, which was issued pursuant to regulations, authorizes Cape Wind to construct and operate an offshore renewable wind energy project in federal waters off... Issued to Cape Wind Associates, LLC (EPA Permit Number OCS-R1-01) AGENCY: Environmental Protection Agency...

  1. NARSTO SOS99NASH WIND PROFILER DATA

    Atmospheric Science Data Center

    2018-04-16

    NARSTO SOS99NASH WIND PROFILER DATA Project Title:  NARSTO ... Platform:  Ground Station Instrument:  Wind Profiler Location:  Nashville, Tennessee Spatial ... Data Guide Documents:  SOS99Nash Wind Profiler Guide Related Data:  Southern Oxidants ...

  2. 78 FR 91 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-02

    ... Cabazon Wind, LLC, FPL Energy Green Power Wind, LLC, FPL Energy Montezuma Wind, LLC, FPL Energy New Mexico... Interconnect, LLC, Peetz Table Wind Energy, LLC, NextEra Energy Power Marketing, LLC. Description: NextEra.... Docket Numbers: ER11-3959-003. Applicants: Post Rock Wind Power Project, LLC. Description: Notice of Non...

  3. Final Report of the Computer Assisted Learning Test Project. Report No. 19.

    ERIC Educational Resources Information Center

    Van der Drift, K. D.; And Others

    A pilot project was conducted to gain information to advise the Board of Directors at the University of Leyden as to the feasibility of using a computerized system to aid in instructional programs in the social sciences, law, medicine, arts, mathematics, and natural sciences at a low cost. The pilot project is divided into four parts which are…

  4. Teleconferencing in Education. Evaluation of the Charlton Pilot Project (or, How the Teachers Blew Up the Charlton Bridge).

    ERIC Educational Resources Information Center

    Conboy, Ian

    The Charlton pilot project was one of a number of trials undertaken throughout Australia to bring educational resources to isolated children. In this project, Telecom Australia provided seven small Victorian Higher School Certificate (H.S.C.) schools with two first prototype experimental devices: firstly, a small group terminal and secondly,…

  5. Social Studies Innovations 1968-1969; A Report of the Social Studies Pilots of the SPEEDIER Project.

    ERIC Educational Resources Information Center

    Myers, Charles B.

    Five pilot programs were selected as vehicles to introduce new social studies curriculum ideas into the 52 school systems served by the project. The objectives of this ESEA Title III project were: 1) to improve social studies instruction and teacher classroom behavior; 2) to increase local educator understanding of the new curriculum; 3) to…

  6. Functional Literacy in Mali: Training for Development. Educational Studies and Documents: No. 10.

    ERIC Educational Resources Information Center

    Dumont, Bernard

    With a view to making literacy an integral part of the economic and social development program of Mali, the study represents the third project of the Experimental World Literacy Program which began with functional literacy pilot projects in Tanzania and Iran. A critical report of the implementation of the pilot project in Mali, it contains a…

  7. When Going Hybrid Is Not Enough: Statistical Analysis of Effectiveness of Blended Courses Piloted within Tempus BLATT Project

    ERIC Educational Resources Information Center

    Jovanovic, Aleksandar; Jankovic, Anita; Jovanovic, Snezana Markovic; Peric, Vladan; Vitosevic, Biljana; Pavlovic, Milos

    2015-01-01

    The paper describes the delivery of the courses in the framework of the project implementation and presents the effect the change in the methodology had on student performance as measured by final grade. Methodology: University of Pristina piloted blended courses in 2013 under the framework of the Tempus BLATT project. The blended learning…

  8. Recommendations for the Implementation of the LASSO Workflow

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gustafson, William I; Vogelmann, Andrew M; Cheng, Xiaoping

    The U. S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) Research Fa-cility began a pilot project in May 2015 to design a routine, high-resolution modeling capability to complement ARM’s extensive suite of measurements. This modeling capability, envisioned in the ARM Decadal Vision (U.S. Department of Energy 2014), subsequently has been named the Large-Eddy Simu-lation (LES) ARM Symbiotic Simulation and Observation (LASSO) project, and it has an initial focus of shallow convection at the ARM Southern Great Plains (SGP) atmospheric observatory. This report documents the recommendations resulting from the pilot project to be considered by ARM for imple-mentation into routinemore » operations. During the pilot phase, LASSO has evolved from the initial vision outlined in the pilot project white paper (Gustafson and Vogelmann 2015) to what is recommended in this report. Further details on the overall LASSO project are available at https://www.arm.gov/capabilities/modeling/lasso. Feedback regarding LASSO and the recommendations in this report can be directed to William Gustafson, the project principal investigator (PI), and Andrew Vogelmann, the co-principal investigator (Co-PI), via lasso@arm.gov.« less

  9. Optimization of Installation, Operation and Maintenance at Offshore Wind Projects in the U.S.: Review and Modeling of Existing and Emerging Approaches

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baldock, Nick; Sevilla, Fernando; Redfern, Robin

    The United States Department of Energy (DOE) awarded a grant to GL Garrad Hassan (GL GH) to investigate the logistics, opportunities, and costs associated with existing and emerging installation and operation and maintenance (O&M) activities at offshore wind projects as part of the DOE’s program to reduce barriers facing offshore wind project development in the United States (U.S.). This report (the Report) forms part of Subtopic 5.3 “Optimized Installation, Operation and Maintenance Strategies Study” which in turn is part of the “Removing Market Barriers in U.S. Offshore Wind” set of projects for the DOE. The purpose of Subtopic 5.3 ismore » to aid and facilitate informed decision-making regarding installation and O&M during the development, installation, and operation of offshore wind projects in order to increase efficiency and reduce the levelized cost of energy (LCoE). Given the large area of U.S. territorial waters, the generally higher mean wind speeds offshore, and the proximity to the coast of many large U.S. cities, offshore wind power has the potential to become a significant contributor of energy to U.S. markets. However, for the U.S. to ensure that the development of offshore wind energy projects is carried out in an efficient and cost-effective manner, it is important to be cognizant of the current and emerging practices in both the domestic and international offshore wind energy industries. The U.S. can harness the experience gained globally and combine this with the skills and assets of an already sizeable onshore wind industry, as well as the resources of a mature offshore oil and gas industry, to develop a strong offshore wind sector. The work detailed in this report is aimed at assisting with that learning curve, particularly in terms of offshore specific installation and O&M activities. This Report and the Installation and O&M LCoE Analysis Tool, which were developed together by GL GH as part of this study, allow readers to identify, model and probe the economic merits and sensitivities of various approaches to construction and O&M practices, using illustrative offshore projects across a wide range of alternative offshore development areas located in U.S. waters. The intention is to assist decision-makers in clearly understanding the relative economic benefits of both conventional and novel construction installation methodologies and maintenance techniques within the critical parameters of a Project’s LCoE.« less

  10. Comments for the Cape Wind Associates, LLC, Horseshoe Shoal, Nantucket Sound (Offshore Renewable Energy Project/OCS Air Permit)

    EPA Pesticide Factsheets

    List of comments for the Cape Wind Associates, LLC, Horseshoe Shoal, Nantucket Sound (Offshore Renewable Energy Project/OCS Air Permit: Massachusetts Plan Approval including nonattainment NSR Appendix A requirements).

  11. 77 FR 60281 - Regarding the Acquisition of Four U.S. Wind Farm Project Companies by Ralls Corporation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-03

    ... Acquisition of Four U.S. Wind Farm Project Companies by Ralls Corporation By the authority vested in me as... Pine City Windfarm, LLC (collectively, the Project Companies), all limited liability companies... Powers Act (50 U.S.C. 1701 et seq.), do not, in my judgment, provide adequate and appropriate authority...

  12. Evaluating the Pilot Narnian Virtues Character Education English Curriculum Project: A Study among 11- to 13-Year-Old Students

    ERIC Educational Resources Information Center

    Francis, Leslie J.; Pike, Mark A.; Lickona, Thomas; Lankshear, David W.; Nesfield, Victoria

    2018-01-01

    In order to evaluate the impact of the pilot Narnian Virtues Character Education English Curriculum Project, a pilot sample of 86 year 7 and year 8 students (11 to 13 years of age) completed a battery of tests both before and after participating for six weeks in the programme. The battery of tests comprised 12 Narnian Character Virtue Scales…

  13. Benchmarking U.S. Small Wind Costs with the Distributed Wind Taxonomy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Orrell, Alice C.; Poehlman, Eric A.

    The objective of this report is to benchmark costs for small wind projects installed in the United States using a distributed wind taxonomy. Consequently, this report is a starting point to help expand the U.S. distributed wind market by informing potential areas for small wind cost-reduction opportunities and providing a benchmark to track future small wind cost-reduction progress.

  14. Tom McMurtry - chief of Dryden Flight Operations with STS mated to 747 SCA

    NASA Technical Reports Server (NTRS)

    1991-01-01

    Thomas C. McMurtry in front of the 747 Shuttle Carrier Aircraft. He graduated in June 1957 from the University of Notre Dame with a Bachelor of Science degree in Mechanical Engineering. McMurtry had been part of the university's Navy ROTC program, and after graduation he joined the Navy as a pilot. Before retiring from the Navy in 1964 as a Lieutenant, he graduated from the U.S. Navy Test Pilot School, and had flown such aircraft as the F9F, A3D, A4D, F3D, F-8, A-6, and S-2. McMurtry was then a consultant for the Lockheed Corporation until joining NASA as a research pilot in 1967. While at the Dryden Flight Research Center, he was co-project pilot on the F-8 Digital Fly-By-Wire program, and the 747 Shuttle Carrier Aircraft, as well as project pilot on the F-15 Digital Electronic Engine Control (DEEC) project, the KC-135 Winglets, the F-8 Supercritical Wing project, and the AD-1 Oblique Wing Project. He also made research flights in NASA's YF-12C aircraft (actually a modified SR-71). McMurtry made the last glide flight of the X-24B lifting body on November 26, 1975, and was co-pilot of the 747 Shuttle Carrier Aircraft on the first free flight of the space shuttle Enterprise on August 12, 1977. He was involved in several remotely piloted research vehicle programs, including the FAA/NASA 720 Controlled Impact Demonstration and the 3/8 F-15 Spin Research Vehicle. During McMurtry's 32 years as a pilot and manager at Dryden, he received numerous awards. These include the NASA Exceptional Service Award for his work on the F-8 Supercritical Wing, and the Iven C. Kincheloe Award from the Society of Experimental Test Pilots for his role as chief pilot on the AD-1 project, the NASA Distinguished Service Medal, and the 1999 Milton O. Thomson Lifetime Achievement Award. McMurtry also held a number of management positions at Dryden, including Chief Pilot, Director of Flight Operations, Associate Director of Flight Operations, and was the acting Chief Engineer at the time of his retirement on June 3, 1999. Since becoming a pilot in 1958, he logged more than 11,000 hours of flight time, in aircraft ranging from a WACO open cockpit biplane to a Mach 3 YF-12C, as well as navy trainers, fighters and attack airplanes, the U-2, F-104 and FA-18 chase planes, and diverse research aircraft. McMurtry's fondest memories are of early morning take-offs from Edwards AFB.

  15. Midwest Consortium for Wind Turbine Reliability and Optimization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Scott R. Dana; Douglas E. Adams; Noah J. Myrent

    2012-05-11

    This report provides an overview of the efforts aimed to establish a student focused laboratory apparatus that will enhance Purdue's ability to recruit and train students in topics related to the dynamics, operations and economics of wind turbines. The project also aims to facilitate outreach to students at Purdue and in grades K-12 in the State of Indiana by sharing wind turbine operational data. For this project, a portable wind turbine test apparatus was developed and fabricated utilizing an AirX 400W wind energy converter. This turbine and test apparatus was outfitted with an array of sensors used to monitor windmore » speed, turbine rotor speed, power output and the tower structural dynamics. A major portion of this project included the development of a data logging program used to display real-time sensor data and the recording and creation of output files for data post-processing. The apparatus was tested in an open field to subject the turbine to typical operating conditions and the data acquisition system was adjusted to obtain desired functionality to facilitate use for student projects in existing courses offered at Purdue University and Indiana University. Data collected using the data logging program is analyzed and presented to demonstrate the usefulness of the test apparatus related to wind turbine dynamics and operations.« less

  16. Hexcrete Tower for Harvesting Wind Energy at Taller Hub Heights - Budget Period 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sritharan, Sri

    Interest in designing taller towers for wind energy production in the United States (U.S.) has been steadily growing. In May 2015, it was revealed that taller towers will make wind energy production a reality in all 50 states, including some states that have nearly zero renewables in their energy portfolio. Facilitating wind energy production feasibility in all 50 states will no doubt contribute to increasing the electricity produced by wind from 4.5% in 2013 to a targeted scenario of 35% by 2050 in the Wind Vision report. This project focuses on the Hexcrete tower concept developed for tall towers usingmore » High Strength Concrete (HSC) and/or Ultra-High Performance Concrete (UHPC). Among other benefits, the Hexcrete concept overcomes transportation and logistical challenges, thus facilitating construction of towers with hub heights of 100-m (328-ft) and higher. The goal of this project is to facilitate widespread deployment of Hexcrete towers for harvesting wind energy at 120 to 140-m (394 to 459-ft) hub heights and reduce the Levelized Cost of Energy (LCOE) of wind energy production in the U.S. The technical scope of the project includes detailed design and optimization of at least three wind turbine towers using the Hexcrete concept together with experimental validation and LCOE analyses and development of a commercialization plan.« less

  17. The Impact of Variable Wind Shear Coefficients on Risk Reduction of Wind Energy Projects

    PubMed Central

    Thomson, Allan; Yoonesi, Behrang; McNutt, Josiah

    2016-01-01

    Estimation of wind speed at proposed hub heights is typically achieved using a wind shear exponent or wind shear coefficient (WSC), variation in wind speed as a function of height. The WSC is subject to temporal variation at low and high frequencies, ranging from diurnal and seasonal variations to disturbance caused by weather patterns; however, in many cases, it is assumed that the WSC remains constant. This assumption creates significant error in resource assessment, increasing uncertainty in projects and potentially significantly impacting the ability to control gird connected wind generators. This paper contributes to the body of knowledge relating to the evaluation and assessment of wind speed, with particular emphasis on the development of techniques to improve the accuracy of estimated wind speed above measurement height. It presents an evaluation of the use of a variable wind shear coefficient methodology based on a distribution of wind shear coefficients which have been implemented in real time. The results indicate that a VWSC provides a more accurate estimate of wind at hub height, ranging from 41% to 4% reduction in root mean squared error (RMSE) between predicted and actual wind speeds when using a variable wind shear coefficient at heights ranging from 33% to 100% above the highest actual wind measurement. PMID:27872898

  18. Delayed flap approach procedures for noise abatement and fuel conservation

    NASA Technical Reports Server (NTRS)

    Edwards, F. G.; Bull, J. S.; Foster, J. D.; Hegarty, D. M.; Drinkwater, F. J., III

    1976-01-01

    The NASA/Ames Research Center is currently investigating the delayed flap approach during which pilot actions are determined and prescribed by an onboard digital computer. The onboard digital computer determines the proper timing for the deployment of the landing gear and flaps based on the existing winds and airplane gross weight. Advisory commands are displayed to the pilot. The approach is flown along the conventional ILS glide slope but is initiated at a higher airspeed and in a clean aircraft configuration that allows for low thrust and results in reduced noise and fuel consumption. Topics discussed include operational procedures, pilot acceptability of these procedures, and fuel/noise benefits resulting from flight tests and simulation.

  19. Application of global weather and climate model output to the design and operation of wind-energy systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Curry, Judith

    This project addressed the challenge of providing weather and climate information to support the operation, management and planning for wind-energy systems. The need for forecast information is extending to longer projection windows with increasing penetration of wind power into the grid and also with diminishing reserve margins to meet peak loads during significant weather events. Maintenance planning and natural gas trading is being influenced increasingly by anticipation of wind generation on timescales of weeks to months. Future scenarios on decadal time scales are needed to support assessment of wind farm siting, government planning, long-term wind purchase agreements and the regulatorymore » environment. The challenge of making wind forecasts on these longer time scales is associated with a wide range of uncertainties in general circulation and regional climate models that make them unsuitable for direct use in the design and planning of wind-energy systems. To address this challenge, CFAN has developed a hybrid statistical/dynamical forecasting scheme for delivering probabilistic forecasts on time scales from one day to seven months using what is arguably the best forecasting system in the world (European Centre for Medium Range Weather Forecasting, ECMWF). The project also provided a framework to assess future wind power through developing scenarios of interannual to decadal climate variability and change. The Phase II research has successfully developed an operational wind power forecasting system for the U.S., which is being extended to Europe and possibly Asia.« less

  20. Application Documents for the Cape Wind Associates, LLC, Horseshoe Shoal, Nantucket Sound (Offshore Renewable Energy Project/OCS Air Permit)

    EPA Pesticide Factsheets

    List of application documents for the Cape Wind Associates, LLC, Horseshoe Shoal, Nantucket Sound (Offshore Renewable Energy Project/OCS Air Permit: Massachusetts Plan Approval including nonattainment NSR Appendix A requirements).

  1. Analysis of Unit-Level Changes in Operations with Increased SPP Wind from EPRI/LCG Balancing Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hadley, Stanton W

    2012-01-01

    Wind power development in the United States is outpacing previous estimates for many regions, particularly those with good wind resources. The pace of wind power deployment may soon outstrip regional capabilities to provide transmission and integration services to achieve the most economic power system operation. Conversely, regions such as the Southeastern United States do not have good wind resources and will have difficulty meeting proposed federal Renewable Portfolio Standards with local supply. There is a growing need to explore innovative solutions for collaborating between regions to achieve the least cost solution for meeting such a renewable energy mandate. The Departmentmore » of Energy funded the project 'Integrating Midwest Wind Energy into Southeast Electricity Markets' to be led by EPRI in coordination with the main authorities for the regions: SPP, Entergy, TVA, Southern Company and OPC. EPRI utilized several subcontractors for the project including LCG, the developers of the model UPLAN. The study aims to evaluate the operating cost benefits of coordination of scheduling and balancing for Southwest Power Pool (SPP) wind transfers to Southeastern Electric Reliability Council (SERC) Balancing Authorities (BAs). The primary objective of this project is to analyze the benefits of regional cooperation for integrating mid-western wind energy into southeast electricity markets. Scenarios were defined, modeled and investigated to address production variability and uncertainty and the associated balancing of large quantities of wind power in SPP and delivery to energy markets in the southern regions of the SERC. DOE funded Oak Ridge National Laboratory to provide additional support to the project, including a review of results and any side analysis that may provide additional insight. This report is a unit-by-unit analysis of changes in operations due to the different scenarios used in the overall study. It focuses on the change in capacity factors and the number of start-ups required for each unit since those criteria summarize key aspects of plant operations, how often are they called upon and how much do they operate. The primary analysis of the overall project is based on security-constrained unit commitment (SCUC) and economic dispatch (SCED) simulations of the SPP-SERC regions as modeled for the year 2022. The SCUC/SCED models utilized for the project were developed through extensive consultation with the project utility partners, to ensure the various regions and operational practices are represented as best as possible in the model. SPP, Entergy, Oglethorpe Power Company (OPC), Southern Company, and the Tennessee Valley Authority (TVA) actively participated in the project providing input data for the models and review of simulation results and conclusions. While other SERC utility systems are modeled, the listed SERC utilities were explicitly included as active participants in the project due to the size of their load and relative proximity to SPP for importing wind energy.« less

  2. Mod-2 wind turbine project assessment and cluster test plans

    NASA Technical Reports Server (NTRS)

    Gordon, L. H.

    1982-01-01

    An assessment of the Mod-2 Wind Turbine project is presented based on initial goals and present results. Specifically, the Mod-2 background, project flow, and a chronology of events/results leading to Mod-2 acceptance is presented. After checkout/acceptance of the three operating turbines, NASA/LeRC will continue management of a two year test program performed at the DOE Goodnoe Hills test site. This test program is expected to yield data necessary for the continued development and optimization of wind energy systems. These test activities, the implementation of, and the results to date are also presented.

  3. Enabling CSPA Operations Through Pilot Involvement in Longitudinal Approach Spacing

    NASA Technical Reports Server (NTRS)

    Battiste, Vernol (Technical Monitor); Pritchett, Amy

    2003-01-01

    Several major airports around the United States have, or plan to have, closely-spaced parallel runways. This project complemented current and previous research by examining the pilots ability to control their position longitudinally within their approach stream.This project s results considered spacing for separation from potential positions of wake vortices from the parallel approach. This preventive function could enable CSPA operations to very closely spaced runways. This work also considered how pilot involvement in longitudinal spacing could allow for more efficient traffic flow, by allowing pilots to keep their aircraft within tighter arrival slots then air traffic control (ATC) might be able to establish, and by maintaining space within the arrival stream for corresponding departure slots. To this end, this project conducted several research studies providing an analytic and computational basis for calculating appropriate aircraft spacings, experimental results from a piloted flight simulator test, and an experimental testbed for future simulator tests. The following sections summarize the results of these three efforts.

  4. A Review of Wind Project Financing Structures in the USA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bolinger, Mark A; Harper, John; Karcher, Matthew

    2008-09-24

    The rapid pace of wind power development in the U.S. over the last decade has outstripped the ability of most project developers to provide adequate equity capital and make efficient use of project-related tax benefits. In response, the sector has created novel project financing structures that feature varying combinations of equity capital from project developers and third-party tax-oriented investors, and in some cases commercial debt. While their origins stem from variations in the financial capacity and business objectives of wind project developers, as well as the risk tolerances and objectives of equity and debt providers, each structure is, at itsmore » core, designed to manage project risk and allocate federal tax incentives to those entities that can use them most efficiently. This article surveys the six principal financing structures through which most new utility-scale wind projects (excluding utility-owned projects) in the U.S. have been financed from 1999 to the present. These structures include simple balance-sheet finance, several varieties of all-equity special allocation partnership 'flip' structures, and two leveraged structures. In addition to describing each structure's mechanics, the article also discusses its rationale for use, the types of investors that find it appealing and why, and its relative frequency of use in the market. The article concludes with a generalized summary of how a developer might choose one structure over another.« less

  5. Offshore Wind Plant Balance-of-Station Cost Drivers and Sensitivities (Poster)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Saur, G.; Maples, B.; Meadows, B.

    2012-09-01

    With Balance of System (BOS) costs contributing up to 70% of the installed capital cost, it is fundamental to understanding the BOS costs for offshore wind projects as well as potential cost trends for larger offshore turbines. NREL developed a BOS model using project cost estimates developed by GL Garrad Hassan. Aspects of BOS covered include engineering and permitting, ports and staging, transportation and installation, vessels, foundations, and electrical. The data introduce new scaling relationships for each BOS component to estimate cost as a function of turbine parameters and size, project parameters and size, and soil type. Based on themore » new BOS model, an analysis to understand the non-turbine costs associated with offshore turbine sizes ranging from 3 MW to 6 MW and offshore wind plant sizes ranging from 100 MW to 1000 MW has been conducted. This analysis establishes a more robust baseline cost estimate, identifies the largest cost components of offshore wind project BOS, and explores the sensitivity of the levelized cost of energy to permutations in each BOS cost element. This presentation shows results from the model that illustrates the potential impact of turbine size and project size on the cost of energy from US offshore wind plants.« less

  6. Development of clinical pharmacy in Belgian hospitals through pilot projects funded by the government.

    PubMed

    Somers, A; Spinewine, A; Spriet, I; Steurbaut, S; Tulkens, P; Hecq, J D; Willems, L; Robays, H; Dhoore, M; Yaras, H; Vanden Bremt, I; Haelterman, M

    2018-04-30

    Objectives The goal is to develop clinical pharmacy in the Belgian hospitals to improve drug efficacy and to reduce drug-related problems. Methods From 2007 to 2014, financial support was provided by the Belgian federal government for the development of clinical pharmacy in Belgian hospitals. This project was guided by a national Advisory Working Group. Each funded hospital was obliged to describe yearly its clinical pharmacy activities. Results In 2007, 20 pharmacists were funded in 28 pilot hospitals; this number was doubled in 2009 to 40 pharmacists over 54 institutions, representing more than half of all acute Belgian hospitals. Most projects (72%) considered patient-related activities, whereas some projects (28%) had a hospital-wide approach. The projects targeted patients at admission (30%), during hospital stay (52%) or at discharge (18%). During hospital stay, actions were mainly focused on geriatric patients (20%), surgical patients (15%), and oncology patients (9%). Experiences, methods, and tools were shared during meetings and workshops. Structure, process, and outcome indicators were reported and strengths, weaknesses, opportunities, and threats were described. The yearly reports revealed that the hospital board was engaged in the project in 87% of the cases, and developed a vision on clinical pharmacy in 75% of the hospitals. In 2014, the pilot phase was replaced by structural financing for clinical pharmacy in all acute Belgian hospitals. Conclusion The pilot projects in clinical pharmacy funded by the federal government provided a unique opportunity to launch clinical pharmacy activities on a broad scale in Belgium. The results of the pilot projects showed clear implementation through case reports, time registrations, and indicators. Tools for clinical pharmacy activities were developed to overcome identified barriers. The engagement of hospital boards and the results of clinical pharmacy activities persuaded the government to start structural financing of clinical pharmacy.

  7. Changing vessel routes could significantly reduce the cost of future offshore wind projects.

    PubMed

    Samoteskul, Kateryna; Firestone, Jeremy; Corbett, James; Callahan, John

    2014-08-01

    With the recent emphasis on offshore wind energy Coastal and Marine Spatial Planning (CMSP) has become one of the main frameworks used to plan and manage the increasingly complex web of ocean and coastal uses. As wind development becomes more prevalent, existing users of the ocean space, such as commercial shippers, will be compelled to share their historically open-access waters with these projects. Here, we demonstrate the utility of using cost-effectiveness analysis (CEA) to support siting decisions within a CMSP framework. In this study, we assume that large-scale offshore wind development will take place in the US Mid-Atlantic within the next decades. We then evaluate whether building projects nearshore or far from shore would be more cost-effective. Building projects nearshore is assumed to require rerouting of the commercial vessel traffic traveling between the US Mid-Atlantic ports by an average of 18.5 km per trip. We focus on less than 1500 transits by large deep-draft vessels. We estimate that over 29 years of the study, commercial shippers would incur an additional $0.2 billion (in 2012$) in direct and indirect costs. Building wind projects closer to shore where vessels used to transit would generate approximately $13.4 billion (in 2012$) in savings. Considering the large cost savings, modifying areas where vessels transit needs to be included in the portfolio of policies used to support the growth of the offshore wind industry in the US. Copyright © 2014 Elsevier Ltd. All rights reserved.

  8. 76 FR 48798 - Agency Information Collection Activities: Proposed Collection; Comment Request-Study of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-09

    ... Nutrition Assistance Program Participation Among Medicare's Extra Help Population Pilot Projects AGENCY... Participation Among Medicare's Extra Help Population Pilot Projects. DATES: Written comments must be received on... Efforts to Increase Supplemental Nutrition Assistance Program Participation Among Medicare's Extra Help...

  9. HARMFUL ALGAL BLOOMS OBSERVING SYSTEM PILOT PROJECT

    EPA Science Inventory

    The HABSOS Pilot Project is being developed through a partnership of federal, state and academic organizations as proof-of-concept for a coastal observing system in the Gulf of Mexico. The goal is to design a HAB data management system and develop the regional communication infra...

  10. 76 FR 16391 - Call for Innovative National Environmental Policy Act (NEPA) Pilot Project Proposals

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-23

    ... COUNCIL ON ENVIRONMENTAL QUALITY Call for Innovative National Environmental Policy Act (NEPA) Pilot Project Proposals AGENCY: Council On Environmental Quality. ACTION: Notice of Availability, Call... the Council on Environmental Quality (CEQ) invites the public and federal agencies to nominate...

  11. 78 FR 70399 - Paperless Hazard Communications Pilot Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-25

    ..., and airplanes) and during inspection and emergency response simulations. (Note: For purposes of the pilot tests conducted under this project, ``simulation'' refers to planned exercises designed solely to... participants. The scope of the simulations will be defined by project data collection needs for testing...

  12. An iodine hypersonic wind tunnel for the study of nonequilibrium reacting flows

    NASA Technical Reports Server (NTRS)

    Pham-Van-diep, G. C.; Muntz, E. P.; Weaver, D. P.; Dewitt, T. G.; Bradley, M. K.; Erwin, D. A.; Kunc, J. A.

    1992-01-01

    A pilot scale hypersonic wind tunnel operating on pure iodine vapor has been designed and tested. The wind tunnel operates intermittently with a run phase lasting approximately 20 minutes. Successful recirculation of the iodine used during the run phase has been achieved but can be improved. Relevant issues regarding the full scale facility's design and operation, and the use of iodine as a working gas are discussed. Continuous wave laser induced fluorescence was used to monitor number densities within the plume flowfield, while pulsed laser induced fluorescence was used in an initial attempt to measure vibrational energy state population distributions. Preliminary nozzle flow calculations based on finite rate chemistry are presented.

  13. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robichaud, R.

    This report focuses on the wind resource assessment, the estimated energy production of wind turbines, and economic potential of a wind turbine project on a ridge in the southeastern portion of the Fort Carson Army base.

  14. Economic Impacts of Wind Turbine Development in U.S. Counties

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    J., Brown; B., Hoen; E., Lantz

    2011-07-25

    The objective is to address the research question using post-project construction, county-level data, and econometric evaluation methods. Wind energy is expanding rapidly in the United States: Over the last 4 years, wind power has contributed approximately 35 percent of all new electric power capacity. Wind power plants are often developed in rural areas where local economic development impacts from the installation are projected, including land lease and property tax payments and employment growth during plant construction and operation. Wind energy represented 2.3 percent of the U.S. electricity supply in 2010, but studies show that penetrations of at least 20 percentmore » are feasible. Several studies have used input-output models to predict direct, indirect, and induced economic development impacts. These analyses have often been completed prior to project construction. Available studies have not yet investigated the economic development impacts of wind development at the county level using post-construction econometric evaluation methods. Analysis of county-level impacts is limited. However, previous county-level analyses have estimated operation-period employment at 0.2 to 0.6 jobs per megawatt (MW) of power installed and earnings at $9,000/MW to $50,000/MW. We find statistically significant evidence of positive impacts of wind development on county-level per capita income from the OLS and spatial lag models when they are applied to the full set of wind and non-wind counties. The total impact on annual per capita income of wind turbine development (measured in MW per capita) in the spatial lag model was $21,604 per MW. This estimate is within the range of values estimated in the literature using input-output models. OLS results for the wind-only counties and matched samples are similar in magnitude, but are not statistically significant at the 10-percent level. We find a statistically significant impact of wind development on employment in the OLS analysis for wind counties only, but not in the other models. Our estimates of employment impacts are not precise enough to assess the validity of employment impacts from input-output models applied in advance of wind energy project construction. The analysis provides empirical evidence of positive income effects at the county level from cumulative wind turbine development, consistent with the range of impacts estimated using input-output models. Employment impacts are less clear.« less

  15. ERDA-NASA wind energy project ready to involve users

    NASA Technical Reports Server (NTRS)

    Thomas, R.; Puthoff, R.; Savino, J.; Johnson, W.

    1976-01-01

    The NASA contribution to the Wind Energy Project is discussed. NASA is responsible for the following: (1) identification of cost-effective configurations and sizes of wind-conversion systems, (2) the development of technology needed to produce these systems, (3) the design of wind-conversion systems that are compatible with user requirements, particularly utility networks, and (4) technology transfer obtained from the program to stimulate rapid commercial application of wind systems. Various elements of the NASA program are outlined, including industry-built user operation, the evaluation phase, the proposed plan and schedule for site selection and user involvement, supporting research and technology (e.g., energy storage), and component and subsystem technology development.

  16. 75 FR 16827 - Notice of Availability of the Draft Granite Mountain Wind, LLC Wind Energy Generation Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-02

    ... wind turbine tower, a maintenance road, and underground electrical and communication lines. Two... to twenty-eight 2.3-megawatt (MW) Siemens wind turbines (or a similar model of wind turbine with a 2... up to 428 feet above the ground. Twenty of the wind turbines would be located on Federal lands...

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shahidehpour, Mohammad

    Integrating 20% or more wind energy into the system and transmitting large sums of wind energy over long distances will require a decision making capability that can handle very large scale power systems with tens of thousands of buses and lines. There is a need to explore innovative analytical and implementation solutions for continuing reliable operations with the most economical integration of additional wind energy in power systems. A number of wind integration solution paths involve the adoption of new operating policies, dynamic scheduling of wind power across interties, pooling integration services, and adopting new transmission scheduling practices. Such practicesmore » can be examined by the decision tool developed by this project. This project developed a very efficient decision tool called Wind INtegration Simulator (WINS) and applied WINS to facilitate wind energy integration studies. WINS focused on augmenting the existing power utility capabilities to support collaborative planning, analysis, and wind integration project implementations. WINS also had the capability of simulating energy storage facilities so that feasibility studies of integrated wind energy system applications can be performed for systems with high wind energy penetrations. The development of WINS represents a major expansion of a very efficient decision tool called POwer Market Simulator (POMS), which was developed by IIT and has been used extensively for power system studies for decades. Specifically, WINS provides the following superiorities; (1) An integrated framework is included in WINS for the comprehensive modeling of DC transmission configurations, including mono-pole, bi-pole, tri-pole, back-to-back, and multi-terminal connection, as well as AC/DC converter models including current source converters (CSC) and voltage source converters (VSC); (2) An existing shortcoming of traditional decision tools for wind integration is the limited availability of user interface, i.e., decision results are often text-based demonstrations. WINS includes a powerful visualization tool and user interface capability for transmission analyses, planning, and assessment, which will be of great interest to power market participants, power system planners and operators, and state and federal regulatory entities; and (3) WINS can handle extended transmission models for wind integration studies. WINS models include limitations on transmission flow as well as bus voltage for analyzing power system states. The existing decision tools often consider transmission flow constraints (dc power flow) alone which could result in the over-utilization of existing resources when analyzing wind integration. WINS can be used to assist power market participants including transmission companies, independent system operators, power system operators in vertically integrated utilities, wind energy developers, and regulatory agencies to analyze economics, security, and reliability of various options for wind integration including transmission upgrades and the planning of new transmission facilities. WINS can also be used by industry for the offline training of reliability and operation personnel when analyzing wind integration uncertainties, identifying critical spots in power system operation, analyzing power system vulnerabilities, and providing credible decisions for examining operation and planning options for wind integration. Researches in this project on wind integration included (1) Development of WINS; (2) Transmission Congestion Analysis in the Eastern Interconnection; (3) Analysis of 2030 Large-Scale Wind Energy Integration in the Eastern Interconnection; (4) Large-scale Analysis of 2018 Wind Energy Integration in the Eastern U.S. Interconnection. The research resulted in 33 papers, 9 presentations, 9 PhD degrees, 4 MS degrees, and 7 awards. The education activities in this project on wind energy included (1) Wind Energy Training Facility Development; (2) Wind Energy Course Development.« less

  18. 75 FR 70021 - South Dakota Prairie Winds Project; Partial Term Relinquishment and Release of Easement for Wind...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-16

    ... certain easement rights for the construction, operation, and maintenance of the proposed wind energy... certain easement rights for the construction, operation, and maintenance of proposed wind energy... were: No Action Alternative (i.e., wind turbines would have to be sited on lands not encumbered with...

  19. 78 FR 40735 - Combined Notice of Filings #2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-08

    ...: Iberdrola Renewables, LLC, Atlantic Renewable Projects II LLC, Dillon Wind LLC, Dry Lake Wind Power, LLC, Dry Lake Wind Power II LLC, Manzana Wind LLC, Mountain View Power Partners III, LLC, Shiloh I Wind... Market Power Analysis in the Northwest Region of Puget Sound Energy, Inc., et. al. Filed Date: 6/28/13...

  20. The Dance Within: A Pilot Project in Dance for the Handicapped and Teaching Dance for the Handicapped: A Curriculum Guide.

    ERIC Educational Resources Information Center

    Michigan Dance Association, Lansing.

    The Michigan Dance Association's Dance Project for the Handicapped is the subject of the two pamphlets that make up this document. The first pamphlet, "The Dance Within," describes the history, nature and goals of the Jackson Pilot Project, the first handicapped dance program in Michigan; it also offers suggestions on how to set up similar…

  1. Offshore Wind Resource, Cost, and Economic Potential in the State of Maine

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Musial, Walter D.

    This report provides information for decision-makers about floating offshore wind technologies in the state of Maine. It summarizes research efforts performed at the National Renewable Energy Laboratory between 2015 and 2017 to analyze the resource potential, cost of offshore wind, and economic potential of offshore wind from four primary reports: Musial et al. (2016); Beiter et al. (2016, 2017); and Mone et al. (unpublished). From Musial et al. (2016), Maine's technical offshore wind resource potential ranked seventh in the nation overall with more than 411 terawatt-hours/year of offshore resource generating potential. Although 90% of this wind resource is greater thanmore » 9.0-meters-per-second average velocity, most of the resource is over deep water, where floating wind technology is needed. Levelized cost of energy and levelized avoided cost of energy were computed to estimate the unsubsidized 'economic potential' for Maine in the year 2027 (Beiter et al. 2016, 2017). The studies found that Maine may have 65 gigawatts of economic potential by 2027, the highest of any U.S. state. Bottom-line costs for the Aqua Ventus project, which is part of the U.S. Department of Energy's Advanced Technology Demonstration project, were released from a proprietary report written by NREL in 2016 for the University of Maine (Mone et al. unpublished). The report findings were that economies of scale and new technology advancements lowered the cost from $300/megawatt-hour (MWh) for the two-turbine 12-megawatt (MW) Aqua Ventus 1 project, to $126/MWh for the commercial-scale, 498-MW Aqua Ventus-2 project. Further cost reductions to $77/MWh were found when new technology advancements were applied for the 1,000-MW Aqua Ventus-3 project in 2030. No new analysis was conducted for this report.« less

  2. Wind for Schools: Developing Educational Programs to Train a New Workforce and the Next Generation of Wind Energy Experts (Poster)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Flowers, L.; Baring-Gould, I.

    2010-04-01

    As the United States dramatically expands wind energy deployment, the industry is challenged with developing a skilled workforce and addressing public resistance. Wind Powering America's Wind for Schools project addresses these issues by: Developing Wind Application Centers (WACs) at universities; installing small wind turbines at community "host" schools; and implementing teacher training with interactive curricula at each host school.

  3. Maps and geospatial data for the Shorty’s Island and Myrtle Bend substrate enhancement pilot projects, Kootenai River near Bonners Ferry, Idaho, 2014

    USGS Publications Warehouse

    Fosness, Ryan L.

    2014-01-01

    This report presents the methods used to develop georeferenced portable document format maps and geospatial data that describe spawning locations and physical habitat characteristics (including egg mat locations, bathymetry, surficial sediment facies, and streamflow velocity) within the substrate enhancement pilot project study area. The results are presented as two maps illustrating the physical habitat characteristics along with proposed habitat enhancement areas, aerial imagery, and hydrography. The results of this study will assist researchers, policy makers, and management agencies in deciding the spatial location and extent of the substrate enhancement pilot project.

  4. A brief summary of the attempts to develop large wind-electric generating systems in the US

    NASA Technical Reports Server (NTRS)

    Savino, J. M.

    1974-01-01

    Interest in developing large wind-electric generating systems in the United States was simulated primarily by one man, Palmer C. Putnam. He was responsible for the construction of the 1250 kilowatt Smith-Putnam wind-electric plant. The existence of this system prompted the U. S. Federal Power Commission to investigate the potential of using the winds as a source energy. Also, in 1933 prior to Putnam's effort, there was an abortive attempt by J. D. Madaras to develop a wind system based on the Magnus effect. These three projects comprise the only serious efforts in America to develop large wind driven plants. In this paper the history of each project is briefly described. Also discussed are some of the reasons why wind energy was not seriously considered as a major source of energy for the U. S.

  5. Wind for Schools: Fostering the Human Talent Supply Chain for a 20% Wind Energy Future (Poster)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baring-Gould, I.

    2011-03-01

    As the United States dramatically expands wind energy deployment, the industry is challenged with developing a skilled workforce and addressing public resistance. Wind Powering America's Wind for Schools project addresses these issues by: 1) Developing Wind Application Centers (WACs) at universities; WAC students assist in implementing school wind turbines and participate in wind courses. 2) Installing small wind turbines at community "host" schools. 3) Implementing teacher training with interactive curricula at each host school.

  6. Arab-American adolescent tobacco use: four pilot studies.

    PubMed

    Rice, Virginia Hill; Templin, Thomas; Kulwicki, Anahid

    2003-11-01

    Four pilot studies were conducted to determine the (1) current tobacco use patterns and predictors among 14- to 18-year-old Arab-American youths; (2) psychometric properties of study measures (English and Arabic); (3) cultural appropriateness of Project Toward No Tobacco (TNT) for intervention; (4) accessible population for a longitudinal study. Three studies were descriptive and one used a pretest-posttest design. From four Pilot Focus groups (N = 28 smokers) key tobacco use themes emerged along with information on study measures and the Project TNT intervention; Pilot Intervention tested the tailored Project TNT intervention with 9 Arab-American teens; Pilot Clinic (N = 44) determined the characteristics of the accessible teen health clinic population; and Pilot School (N = 119) obtained tobacco use data only. From Pilot Focus seven themes (being cool, "nshar ma'a al shabab" [hanging out with the guys], present [time] orientation, smoking feels and tastes good, keeps your mind off trouble, easy to get, and (many) "barriers to quitting") emerged from the data. In the Pilot Intervention a 37.5% cessation rate was found. In the Pilot Clinic study, 24% males and 17% females smoked. The current smoking rate in the Pilot School (N = 119) sample was 17%; 34% admitted to having ever smoked (even a puff). Significant predictors for current tobacco use included poor grades, stress, having many family members and peers who smoke, being exposed to many hours of smoking each day, receiving offers of tobacco products, advertising and mail, and believing that tobacco can help one to make friends. The four pilots contributed unique and essential knowledge for designing a longitudinal clinical trial on tobacco use by Arab-American adolescents.

  7. Final Permit Documents for the Cape Wind Associates, LLC, Horseshoe Shoal, Nantucket Sound (Offshore Renewable Energy Project/OCS Air Permit)

    EPA Pesticide Factsheets

    List of finla permit documents for the Cape Wind Associates, LLC, Horseshoe Shoal, Nantucket Sound (Offshore Renewable Energy Project/OCS Air Permit: Massachusetts Plan Approval including nonattainment NSR Appendix A requirements).

  8. Climate projection of synoptic patterns forming extremely high wind speed over the Barents Sea

    NASA Astrophysics Data System (ADS)

    Surkova, Galina; Krylov, Aleksey

    2017-04-01

    Frequency of extreme weather events is not very high, but their consequences for the human well-being may be hazardous. These seldom events are not always well simulated by climate models directly. Sometimes it is more effective to analyze numerical projection of large-scale synoptic event generating extreme weather. For example, in mid-latitude surface wind speed depends mainly on the sea level pressure (SLP) field - its configuration and horizontal pressure gradient. This idea was implemented for analysis of extreme wind speed events over the Barents Sea. The calendar of high surface wind speed V (10 m above the surface) was prepared for events with V exceeding 99th percentile value in the central part of the Barents Sea. Analysis of probability distribution function of V was carried out on the base of ERA-Interim reanalysis data (6-hours, 0.75x0.75 degrees of latitude and longitude) for the period 1981-2010. Storm wind events number was found to be 240 days. Sea level pressure field over the sea and surrounding area was selected for each storm wind event. For the climate of the future (scenario RCP8.5), projections of SLP from CMIP5 numerical experiments were used. More than 20 climate models results of projected SLP (2006-2100) over the Barents Sea were correlated with modern storm wind SLP fields. Our calculations showed the positive tendency of annual frequency of storm SLP patterns over the Barents Sea by the end of 21st century.

  9. Design features of a low-disturbance supersonic wind tunnel for transition research at low supersonic Mach numbers

    NASA Technical Reports Server (NTRS)

    Wolf, Stephen W. D.; Laub, James A.; King, Lyndell S.; Reda, Daniel C.

    1992-01-01

    A unique, low-disturbance supersonic wind tunnel is being developed at NASA-Ames to support supersonic laminar flow control research at cruise Mach numbers of the High Speed Civil Transport (HSCT). The distinctive design features of this new quiet tunnel are a low-disturbance settling chamber, laminar boundary layers along the nozzle/test section walls, and steady supersonic diffuser flow. This paper discusses these important aspects of our quiet tunnel design and the studies necessary to support this design. Experimental results from an 1/8th-scale pilot supersonic wind tunnel are presented and discussed in association with theoretical predictions. Natural laminar flow on the test section walls is demonstrated and both settling chamber and supersonic diffuser performance is examined. The full-scale wind tunnel should be commissioned by the end of 1993.

  10. WSR-88D doppler radar detection of corn earworm moth migration.

    PubMed

    Westbrook, J K; Eyster, R S; Wolf, W W

    2014-07-01

    Corn earworm (Lepidoptera: Noctuidae) (CEW) populations infesting one crop production area may rapidly migrate and infest distant crop production areas. Although entomological radars have detected corn earworm moth migrations, the spatial extent of the radar coverage has been limited to a small horizontal view above crop production areas. The Weather Service Radar (version 88D) (WSR-88D) continuously monitors the radar-transmitted energy reflected by, and radial speed of, biota as well as by precipitation over areas that may encompass crop production areas. We analyzed data from the WSR-88D radar (S-band) at Brownsville, Texas, and related these data to aerial concentrations of CEW estimated by a scanning entomological radar (X-band) and wind velocity measurements from rawinsonde and pilot balloon ascents. The WSR-88D radar reflectivity was positively correlated (r2=0.21) with the aerial concentration of corn earworm-size insects measured by a scanning X-band radar. WSR-88D radar constant altitude plan position indicator estimates of wind velocity were positively correlated with wind speed (r2=0.56) and wind direction (r2=0.63) measured by pilot balloons and rawinsondes. The results reveal that WSR-88D radar measurements of insect concentration and displacement speed and direction can be used to estimate the migratory flux of corn earworms and other nocturnal insects, information that could benefit areawide pest management programs. In turn, identification of the effects of spatiotemporal patterns of migratory flights of corn earworm-size insects on WSR-88D radar measurements may lead to the development of algorithms that increase the accuracy of WSR-88D radar measurements of reflectivity and wind velocity for operational meteorology.

  11. WSR-88D doppler radar detection of corn earworm moth migration

    NASA Astrophysics Data System (ADS)

    Westbrook, J. K.; Eyster, R. S.; Wolf, W. W.

    2014-07-01

    Corn earworm (Lepidoptera: Noctuidae) (CEW) populations infesting one crop production area may rapidly migrate and infest distant crop production areas. Although entomological radars have detected corn earworm moth migrations, the spatial extent of the radar coverage has been limited to a small horizontal view above crop production areas. The Weather Service Radar (version 88D) (WSR-88D) continuously monitors the radar-transmitted energy reflected by, and radial speed of, biota as well as by precipitation over areas that may encompass crop production areas. We analyzed data from the WSR-88D radar (S-band) at Brownsville, Texas, and related these data to aerial concentrations of CEW estimated by a scanning entomological radar (X-band) and wind velocity measurements from rawinsonde and pilot balloon ascents. The WSR-88D radar reflectivity was positively correlated ( r 2 = 0.21) with the aerial concentration of corn earworm-size insects measured by a scanning X-band radar. WSR-88D radar constant altitude plan position indicator estimates of wind velocity were positively correlated with wind speed ( r 2 = 0.56) and wind direction ( r 2 = 0.63) measured by pilot balloons and rawinsondes. The results reveal that WSR-88D radar measurements of insect concentration and displacement speed and direction can be used to estimate the migratory flux of corn earworms and other nocturnal insects, information that could benefit areawide pest management programs. In turn, identification of the effects of spatiotemporal patterns of migratory flights of corn earworm-size insects on WSR-88D radar measurements may lead to the development of algorithms that increase the accuracy of WSR-88D radar measurements of reflectivity and wind velocity for operational meteorology.

  12. PILOT PROJECT CLOSE UP: ORD RESEARCH INVENTORY

    EPA Science Inventory

    Harvey, Jim and Elin Ulrich. 2004. Pilot Project Close Up: ORD Research Inventory. Changing Times. Pp. 1. (ERL,GB R1022).

    At the January 2003 summit, many people were drawn to our vision of improving ORD's internal communications by creating a "go-to" page that consolicat...

  13. Information technology feasibility study for the Washington State commercial vehicle information systems and networks (CVISN) pilot project

    DOT National Transportation Integrated Search

    1998-01-08

    The CVISN Pilot Project will prototype the use of a comprehensive interface to state and federal motor carrier data systems and will deliver real-time, decision-making information to weigh stations and commercial vehicle enforcement officers. In addi...

  14. 129,000 pound pilot project : report to the 62nd Idaho State Legislature.

    DOT National Transportation Integrated Search

    2013-01-01

    In 2003, the Idaho Legislature passed House Bill 395, which created a pilot project to test the effect of : increasing the legal truck weights on State Highways. Trucks configured to increase gross vehicle weight : (GVW) from 105,500 pounds to 129,00...

  15. Pilot age and error in air taxi crashes.

    PubMed

    Rebok, George W; Qiang, Yandong; Baker, Susan P; Li, Guohua

    2009-07-01

    The associations of pilot error with the type of flight operations and basic weather conditions are well documented. The correlation between pilot characteristics and error is less clear. This study aims to examine whether pilot age is associated with the prevalence and patterns of pilot error in air taxi crashes. Investigation reports from the National Transportation Safety Board for crashes involving non-scheduled Part 135 operations (i.e., air taxis) in the United States between 1983 and 2002 were reviewed to identify pilot error and other contributing factors. Crash circumstances and the presence and type of pilot error were analyzed in relation to pilot age using Chi-square tests. Of the 1751 air taxi crashes studied, 28% resulted from mechanical failure, 25% from loss of control at landing or takeoff, 7% from visual flight rule conditions into instrument meteorological conditions, 7% from fuel starvation, 5% from taxiing, and 28% from other causes. Crashes among older pilots were more likely to occur during the daytime rather than at night and off airport than on airport. The patterns of pilot error in air taxi crashes were similar across age groups. Of the errors identified, 27% were flawed decisions, 26% were inattentiveness, 23% mishandled aircraft kinetics, 15% mishandled wind and/or runway conditions, and 11% were others. Pilot age is associated with crash circumstances but not with the prevalence and patterns of pilot error in air taxi crashes. Lack of age-related differences in pilot error may be attributable to the "safe worker effect."

  16. Final Technical Report, Wind Generator Project (Ann Arbor)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Geisler, Nathan

    A Final Technical Report (57 pages) describing educational exhibits and devices focused on wind energy, and related outreach activities and programs. Project partnership includes the City of Ann Arbor, MI and the Ann Arbor Hands-on Museum, along with additional sub-recipients, and U.S. Department of Energy/Office of Energy Efficiency and Renewable Energy (EERE). Report relays key milestones and sub-tasks as well as numerous graphics and images of five (5) transportable wind energy demonstration devices and five (5) wind energy exhibits designed and constructed between 2014 and 2016 for transport and use by the Ann Arbor Hands-on Museum.

  17. Transportation of Large Wind Components: A Review of Existing Geospatial Data

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mooney, Meghan; Maclaurin, Galen

    2016-09-01

    This report features the geospatial data component of a larger project evaluating logistical and infrastructure requirements for transporting oversized and overweight (OSOW) wind components. The goal of the larger project was to assess the status and opportunities for improving the infrastructure and regulatory practices necessary to transport wind turbine towers, blades, and nacelles from current and potential manufacturing facilities to end-use markets. The purpose of this report is to summarize existing geospatial data on wind component transportation infrastructure and to provide a data gap analysis, identifying areas for further analysis and data collection.

  18. Advances in Projection Moire Interferometry Development for Large Wind Tunnel Applications

    NASA Technical Reports Server (NTRS)

    Fleming, Gary A.; Soto, Hector L.; South, Bruce W.; Bartram, Scott M.

    1999-01-01

    An instrument development program aimed at using Projection Moire Interferometry (PMI) for acquiring model deformation measurements in large wind tunnels was begun at NASA Langley Research Center in 1996. Various improvements to the initial prototype PMI systems have been made throughout this development effort. This paper documents several of the most significant improvements to the optical hardware and image processing software, and addresses system implementation issues for large wind tunnel applications. The improvements have increased both measurement accuracy and instrument efficiency, promoting the routine use of PMI for model deformation measurements in production wind tunnel tests.

  19. 2013 Cost of Wind Energy Review

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mone, C.; Smith, A.; Maples, B.

    2015-02-01

    This report uses representative project types to estimate the levelized cost of wind energy (LCOE) in the United States for 2013. Scheduled to be published on an annual basis, it relies on both market and modeled data to maintain a current understanding of wind generation cost trends and drivers. It is intended to provide insight into current component-level costs and a basis for understanding current component-level costs and a basis for understanding variability in the LCOE across the industry. Data and tools developed from this analysis are used to inform wind technology cost projections, goals, and improvement opportunities.

  20. A nonlinear dynamics approach for incorporating wind-speed patterns into wind-power project evaluation.

    PubMed

    Huffaker, Ray; Bittelli, Marco

    2015-01-01

    Wind-energy production may be expanded beyond regions with high-average wind speeds (such as the Midwest U.S.A.) to sites with lower-average speeds (such as the Southeast U.S.A.) by locating favorable regional matches between natural wind-speed and energy-demand patterns. A critical component of wind-power evaluation is to incorporate wind-speed dynamics reflecting documented diurnal and seasonal behavioral patterns. Conventional probabilistic approaches remove patterns from wind-speed data. These patterns must be restored synthetically before they can be matched with energy-demand patterns. How to accurately restore wind-speed patterns is a vexing problem spurring an expanding line of papers. We propose a paradigm shift in wind power evaluation that employs signal-detection and nonlinear-dynamics techniques to empirically diagnose whether synthetic pattern restoration can be avoided altogether. If the complex behavior of observed wind-speed records is due to nonlinear, low-dimensional, and deterministic system dynamics, then nonlinear dynamics techniques can reconstruct wind-speed dynamics from observed wind-speed data without recourse to conventional probabilistic approaches. In the first study of its kind, we test a nonlinear dynamics approach in an application to Sugarland Wind-the first utility-scale wind project proposed in Florida, USA. We find empirical evidence of a low-dimensional and nonlinear wind-speed attractor characterized by strong temporal patterns that match up well with regular daily and seasonal electricity demand patterns.