40 CFR 35.2102 - Water quality management planning.
Code of Federal Regulations, 2011 CFR
2011-07-01
... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2102 Water quality management planning. Before grant assistance can be awarded for any treatment works project, the Regional... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Water quality management planning. 35...
77 FR 44216 - Mid-Atlantic Fishery Management Council (MAFMC); Public Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-27
..., 2012--The Visioning and Strategic Planning Working Group (facilitated by Adam R. Saslow, Senior.... SUMMARY: The Mid-Atlantic Fishery Management Council (Council) and its Strategic Planning Working Group... INFORMATION: Monday, August 13, 2012 9 a.m. until 5 p.m.--The Visioning and Strategic Planning Working Group...
Tank waste remediation system configuration management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vann, J.M.
The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Projectmore » personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.« less
Non-Profit/Higher Education Project Management Series: The Project Plan
ERIC Educational Resources Information Center
Burgher, Karl E.; Snyder, Michael
2012-01-01
This is the second installment of the AACRAO management series focusing on project management in the academy. In this article, the authors focus on white papers (often called charters, briefs, or fact sheets) and their partner, the work plan. The work plan is a detailed document that defines each aspect of a project. It is often preceded by a…
ERIC Educational Resources Information Center
Freeburg, Beth Winfrey; Arnett, Sally E.
2010-01-01
The purpose of this study was to measure the effect of appearance management training, work status, and plans after high school on students' opinions about appearance at school and at work. A nonprobability sample of 132 high school juniors and seniors in a consumer education class were administered the Appearance Management Survey before and…
Strategic planning applied to quality in asthma management for children.
Goonan, K J; Healy, J M; Jordan, H S; Zazzali, J L; Horowitz, M
1993-01-01
This strategic plan translates the HCHP vision statement into a working plan for one major clinical condition--asthma in children. It is a working plan for clinicians and managers across specialties and levels. The results of the projects will improve in a measurable way significant clinical practice and outcomes, in keeping with the FY 1993 strategic goals.
36 CFR 327.30 - Shoreline Management on Civil Works Projects.
Code of Federal Regulations, 2010 CFR
2010-07-01
... ADMINISTERED BY THE CHIEF OF ENGINEERS § 327.30 Shoreline Management on Civil Works Projects. (a) Purpose. The... this regulation, shoreline management plans are not required for those projects where construction was... approval, one copy of each project Shoreline Management Plan will be forwarded to HQUSACE (CECW-ON) WASH DC...
NASA Technical Reports Server (NTRS)
Connelly, L. C.
1977-01-01
The mission planning processor is a user oriented tool for consumables management and is part of the total consumables subsystem management concept. The approach to be used in developing a working model of the mission planning processor is documented. The approach includes top-down design, structured programming techniques, and application of NASA approved software development standards. This development approach: (1) promotes cost effective software development, (2) enhances the quality and reliability of the working model, (3) encourages the sharing of the working model through a standard approach, and (4) promotes portability of the working model to other computer systems.
Site planning and integration fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.1
DOE Office of Scientific and Technical Information (OSTI.GOV)
SCHULTZ, E.A.
The primary mission of the Site Planning and Integration (SP and I) project is to assist Fluor Daniel Project Direction to ensure that all work performed under the Project Hanford Management Contract (PHMC) is adequately planned, executed, controlled, and that performance is measured and reported in an integrated fashion. Furthermore, SP and I is responsible for the development, implementation, and management of systems and processes that integrate technical, schedule, and cost baselines for PHMC work.
78 FR 42798 - Notice of Public Meeting, Northwest Colorado Resource Advisory Council Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-17
... Sage-Grouse Planning Strategy, working group reports, recreation, fire management, land use planning, invasive species management, energy and minerals management, travel management, wilderness, wild horse herd...
24 CFR 570.415 - Community Development Work Study Program.
Code of Federal Regulations, 2010 CFR
2010-04-01
... and economic development, community planning, and community management. The primary objectives of the... economic development, community planning, and community management, and to provide a cadre of well... economic development, community planning, community management, land use and housing activities. Community...
The need for coherence between waterfowl harvest and habitat management
Runge, M.C.; Johnson, F.A.; Anderson, M.G.; Koneff, M.D.; Reed, E.T.; Mott, S.E.
2006-01-01
Two of the most significant management efforts affecting waterfowl populations in North America are the North American Waterfowl Management Plan (the Plan) and Federal harvest management programs. Both the Plan and harvest management are continental in scope, involve an extensive group of stakeholders, and rely on adaptive processes of biological planning, implementation, and evaluation. The development of these programs has occurred independently, however, and there has been little explicit recognition that both harvest and habitat effects should be considered for coherent management planning and evaluation. For example, the harvest strategy can affect whether population objectives of the Plan are met, irrespective of the success of the Plan's habitat conservation efforts. Conversely, habitat conservation activities under the Plan can influence harvest potential and, therefore, the amount of hunting opportunity provided. It seems increasingly clear that the Plan's waterfowl population objectives can only be useful for conservation planning and evaluation if they are accompanied by an explicit specification of the harvest strategy and environmental conditions under which they are to be achieved. This clarification also is necessary to ensure that Plan population objectives are not attained solely through the reduction of hunting opportunity. We believe then that it is imperative that these key waterfowl-management programs work to harmonize their objectives. Harvest management programs and the Plan ought to be working toward the same ends, but that is not possible so long as the mutually reinforcing relationship of these programs is obscured by ambiguities in their management objectives.
Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2
DOE Office of Scientific and Technical Information (OSTI.GOV)
GRYGIEL, M.L.
1998-10-08
Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baselinemore » and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.« less
USEPA Region 6 and the US Army Corps of Engineers submit for public comment the Draft Site Management and Monitoring Plan for Corpus Christi Maintenance and New Work Ocean Dredged Material Disposal Site
DOT National Transportation Integrated Search
2014-07-01
This funding enabled the project entitled, USING HISTORICAL CRASH DATA AS PART OF TRAFFIC WORK ZONE SAFETY : PLANNING AND PROJECT MANAGEMENT STRATEGIES to address the following: : Evaluate current organizational strategies with respect to w...
The importance of work or productive activity in life care planning and case management.
Reid, Christine; Riddick-Grisham, Susan
2015-01-01
The importance of work or productive activity for the well-being, community integration, and quality of life of people living with disabilities is addressed, with implications for life care planning and case management. The role of work or productive activity in our society, and consequences of deprivation if rehabilitation services do not address vocational effects of disabilities, is explored. A continuum of productivity options is introduced; types of vocational rehabilitation assessment processes and interventions are described. The role of vocational rehabilitation services in life care planning and case management is discussed, focusing on quality of life for people living with disabilities. Rehabilitation and health care professionals should understand the importance of work or other productive activity, and support the development of appropriate plans to address those needs among people who have disabilities.
40 CFR 35.408 - Award limitations.
Code of Federal Regulations, 2014 CFR
2014-07-01
... full delegation. (c) For permit and planning grants unless the work plan submitted with the application... funding under sections 106 (Water Pollution Control) and 205(j) (Water Quality Management Planning) of the Clean Water Act. Water Quality Management Planning Grants (Section 205(j)(2)) ...
strategic scenario planning and analysis Program portfolio analysis Program management, planning and strategic execution Change management and operational improvement Research Interests Bioenergy supply chains management, organizational improvement, and program and project management. Prior Work Experience Consultant
40 CFR 35.2023 - Water quality management planning.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... to the States to carry out water quality management planning including but not limited to: (1... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality...
40 CFR 35.2023 - Water quality management planning.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality... to the States to carry out water quality management planning including but not limited to: (1...
40 CFR 35.2023 - Water quality management planning.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality... to the States to carry out water quality management planning including but not limited to: (1...
40 CFR 35.2102 - Water quality management planning.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2102 Water quality... Administrator shall first determine that the project is: (a) Included in any water quality management plan being...
40 CFR 35.2102 - Water quality management planning.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2102 Water quality... Administrator shall first determine that the project is: (a) Included in any water quality management plan being...
40 CFR 35.2102 - Water quality management planning.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Water quality management planning. 35.2102 Section 35.2102 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2102 Water quality management planning. Before grant...
Managing Dualities in Planned Change Initiatives
ERIC Educational Resources Information Center
Barge, J. Kevin; Lee, Michael; Maddux, Kristy; Nabring, Richard; Townsend, Bryan
2008-01-01
Dualities play an important role in creating the conditions for change and managing planned change initiatives. Building on Seo, Putnam, and Bartunek's (2003) work, this study focuses on the dualities associated with managing change processes. A case study of a planned change process called the Circle of Prosperity Initiative, a multi-stakeholder…
40 CFR 35.2023 - Water quality management planning.
Code of Federal Regulations, 2011 CFR
2011-07-01
... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Water quality management planning. 35... to the States to carry out water quality management planning including but not limited to: (1...
U.S. Navy Advanced Receiving: A Better Approach to the Basics.
1987-04-01
the Navy and DLA should begin now to plan for electronic interchange of data between their inventory management systems. This would eliminate the...labor savings from work simplification, improved material handling, and better work load planning 0 Material savings from reduced packaging and use of... planning purposes, source distribution managers use the following equa- tion to determine maximum consolidation time: Maximum consolidation time = 21
Planning documents: a business planning strategy.
Kaehrle, P A
2000-06-01
Strategic planning and business plan development are essential nursing management skills in today's competitive, fast paced, continually changing health care environment. Even in times of great uncertainty, nurse managers need to plan and forecast for the future. A well-written business plan allows nurse managers to communicate their expertise and proactively contribute to the programmatic decisions and changes occurring within their patient population or service area. This article presents the use of planning documents as a practical, strategic business planning strategy. Although the model addresses orthopedic services specifically, nurse managers can gain an understanding and working knowledge of planning concepts that can be applied to all patient populations.
Performance measurement: A tool for program control
NASA Technical Reports Server (NTRS)
Abell, Nancy
1994-01-01
Performance measurement is a management tool for planning, monitoring, and controlling as aspects of program and project management--cost, schedule, and technical requirements. It is a means (concept and approach) to a desired end (effective program planning and control). To reach the desired end, however, performance measurement must be applied and used appropriately, with full knowledge and recognition of its power and of its limitations--what it can and cannot do for the project manager. What is the potential of this management tool? What does performance measurement do that a traditional plan vs. actual technique cannot do? Performance measurement provides an improvement over the customary comparison of how much money was spent (actual cost) vs. how much was planned to be spent based on a schedule of activities (work planned). This commonly used plan vs. actual comparison does not allow one to know from the numerical data if the actual cost incurred was for work intended to be done.
Novel technique for tracking manpower and work packages: a useful tool for the team and management
NASA Astrophysics Data System (ADS)
Gill, R.; Gracia, G.; Lupton, R. H.; O'Mullane, W.
2014-08-01
In these times of austerity it is becoming more and more important to justify the need for manpower to management. Additionally, with the fast pace of today's projects the need for tools that facilitate teams to not only plan, but also track their work, are essential. The practice of planning work packages and the associated manpower has been about for a while but little is done to really cross-check that planning against reality. In this paper these elements are brought together through a number of tools that make up the end to end process of planning, tracking and reporting of work package progress and manpower usage.
FY 1987 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less
Guidelines for developing transportation management plans in Virginia.
DOT National Transportation Integrated Search
2005-01-01
A transportation management plan (TMP) is a comprehensive program of traffic control, communication, operation, and demand management strategies designed to maintain acceptable levels of traffic flow in work zones. A systematic procedure and/or check...
The importance of work or productive activity in life care planning and case management
Reid, Christine; Riddick-Grisham, Susan
2015-01-01
Abstract INTRODUCTION: The importance of work or productive activity for the well-being, community integration, and quality of life of people living with disabilities is addressed, with implications for life care planning and case management. BACKGROUND: The role of work or productive activity in our society, and consequences of deprivation if rehabilitation services do not address vocational effects of disabilities, is explored. A continuum of productivity options is introduced; types of vocational rehabilitation assessment processes and interventions are described. PURPOSE: The role of vocational rehabilitation services in life care planning and case management is discussed, focusing on quality of life for people living with disabilities. CONCLUSION: Rehabilitation and health care professionals should understand the importance of work or other productive activity, and support the development of appropriate plans to address those needs among people who have disabilities. PMID:26409330
40 CFR 35.418 - Award limitations.
Code of Federal Regulations, 2014 CFR
2014-07-01
... STATE AND LOCAL ASSISTANCE Environmental Program Grants Water Quality Management Planning Grants... State agency: (a) Unless the agency develops its work plan jointly with local, regional and interstate... planning organizations to carry out portions of that work plan. (b) Unless the agency reports annually on...
40 CFR 35.418 - Award limitations.
Code of Federal Regulations, 2011 CFR
2011-07-01
... STATE AND LOCAL ASSISTANCE Environmental Program Grants Water Quality Management Planning Grants... State agency: (a) Unless the agency develops its work plan jointly with local, regional and interstate... planning organizations to carry out portions of that work plan. (b) Unless the agency reports annually on...
40 CFR 35.418 - Award limitations.
Code of Federal Regulations, 2012 CFR
2012-07-01
... STATE AND LOCAL ASSISTANCE Environmental Program Grants Water Quality Management Planning Grants... State agency: (a) Unless the agency develops its work plan jointly with local, regional and interstate... planning organizations to carry out portions of that work plan. (b) Unless the agency reports annually on...
Nanaumi, Yoko; Onda, Mitsuko; Sakurai, Hidehiko; Tanaka, Rie; Tsubota, Kenichi; Matoba, Shunya; Mukai, Yusuke; Arakawa, Yukio; Hayase, Yukitoshi
2010-11-01
A survey of care managers ("CMs") was conducted to identify top priority issues in promoting the management and guidance of home-visiting by a pharmacist ("management and guidance") by focusing on the experience in incorporating the management and guidance into a care plan and its relevant factors. Major survey items included (1) number of years working as a CM, (2) basic occupation, (3) experience in incorporating the management and guidance into care plans, (4) understanding the management and guidance content, and (5) an awareness of the need for pharmacists' involvement in care plans. A χ² test was conducted to determine if the experience in incorporating the management and guidance into care plans caused a difference in the distribution of the number of years as a CM, the basic occupation, understanding of the management and guidance content, and an awareness of the need for pharmacists' involvement in care plans. A regression analysis was conducted to determine the degree of association between the incorporation experience and each item. The numbers of years working as a CM, the basic occupation, understanding of the management and guidance content, and an awareness of the need for pharmacists' involvement in care plans, were found to be associated with the experience in incorporating the management and guidance into care plans. Understanding of the management and guidance content was most closely associated. To promote pharmacists' management and guidance for home-based care, CMs need to deepen their understanding of this service.
ERIC Educational Resources Information Center
National Alliance of Business, Inc., Washington, DC.
This Planning, Management, and Evaluation (PME) guide was developed by the National Alliance of Business as part of its program of management assistance for Private Industry Councils (PICs). The guide is a tool which PICs can use to improve their capability to plan, manage, and evaluate the programs which they administer, and to establish locally…
Using Global Climate Data to Inform Long-Term Water Planning Decisions
NASA Astrophysics Data System (ADS)
Groves, D. G.; Lempert, R.
2008-12-01
Water managers throughout the world are working to consider climate change in their long-term water planning processes. The best available information regarding plausible future hydrologic conditions are largely derived from global circulation models and from paleoclimate data. To date there lacks a single approach for (1) utilizing these data in water management planning tools for analysis and (2) evaluating the myriad of possible adaptation options. This talk will describe several approaches being used at RAND to incorporate global projections of climate change into local, regional, and state-wide long-term water planning. It will draw on current work with the California Department of Water Resources and other local Western water agencies, and a recently completed project with the Inland Empire Utilities Agency. Work to date suggests that climate information can be assimilated into local water planning tools to help identify robust climate adaptation water management strategies.
Tool to assist tribes that apply for Clean Air Act (CAA) funding to draft more effective work plans for projects that will develop tribal knowledge of air quality issues and build tribal expertise to manage air quality on tribal lands.
Succession Planning for Management Staff at a Canadian Post Secondary Technical Institute.
ERIC Educational Resources Information Center
da Costa, Jose; Cembrowski, Barbara
2001-01-01
Analyzed interviews to explore how nine administrators, at three different career stages, perceived career-development and succession planning at a Canadian postsecondary technical institute. Managers attribute career success to possession of varied personal attributes, diverse work experiences, serendipity, and a fulfilling work environment. Job…
40 CFR 35.2023 - Water quality management planning.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Water quality management planning. 35.2023 Section 35.2023 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality management planning. (a) From funds...
40 CFR 35.925-2 - Water quality management plans and agencies.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Water quality management plans and... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-2 Water quality management plans and agencies. That the project is consistent with...
40 CFR 35.925-2 - Water quality management plans and agencies.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Water quality management plans and... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-2 Water quality management plans and agencies. That the project is consistent with...
40 CFR 35.925-2 - Water quality management plans and agencies.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Water quality management plans and... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-2 Water quality management plans and agencies. That the project is consistent with...
Civil Engineering Work Information Management System (WIMS) Planning Guide,
1985-04-01
WORK INFORMATION MANAGEMENT SYSTEM PLANNING GUIDE l-!O L~ JAUG 0)12 13 "’ ’’’ " " 5 7 2 2 0 0 9 W WTVF--- DISCLAIMER The views and conclusions...y CHAPTER PAGE I INTRODUCTION What is WIMS? --------------------------------- 1I Why Do We Need A WIMS Planning Guide? ------------ I The Target...Administrator ------------------ 21 6 EQUIPMENT AND SUPPLIES Introduction ------------------------------- 22 Magnetic Media Supplies
Total Quality Management Office for Contracting Integrity Implementation Plan
1989-07-01
REPORT______ANDDATESCOVERED 4. TITLE AND SUBTITLE S. FUNDING NUMBERS Total Quality Management Office for Contracting Integrity Implementatiun Plan 6. AUTHOR(S) 7...01-280-5500 Standard Form 298 (Rev. 2-89) P’,croed 1:, ANSI Std 3J9-16 29d. 102 4 TOTAL QUALITY MANAGEMENT OFFICE FOR CONTRACTING INTEGRITY...IMPLEMENTATION PLAN According to the Total Quality Management (TQM) Master Plan, each PSE head, supported by Working Groups, will implement the HQ DLA Master
Contingency plan implementation.
Neurath, D; Cober, N; Owens, W; Giulivi, A
2012-06-01
Although the National blood system in Canada reduces the risk of inventory shortages the possibility of a blood supply shortage still exists. The Ontario Ministry of Health and Long-Term Care developed a provincial plan to manage blood transfusion needs and inventory in the event of a National blood shortage. The Ontario plan was developed to align with the National plan as well as other provincial plans in order to ensure consistency in blood management strategies across the country. The Ontario plan was released in 2008, along with a toolkit to aid hospitals in developing their facility specific plans. In the Champlain region of Ontario, a group of 16 hospitals worked collaboratively to develop a regional blood shortage plan. A provincial blood shortage simulation exercise was held in 2010 to test out these plans. The Director of Transfusion Medicine of the largest facility in the group of 16 hospitals (The Ottawa Hospital) took the lead in the development of the regional blood shortage management plan. Working groups from all 16 sites contributed to the plan development. The proposed plan was presented to the Medical Advisory Committee for approval. The plan consists of activities relating to the severity of the supply shortage as defined by Amber, Red, Recovery and Green phases. The plan includes a communication plan for notifying stakeholders including patients whose treatment may be affected. Inventory management and triage guidelines are provided to reduce the demand for blood and to conserve inventory for those patients whose need is prioritized as highest. The regional blood shortage management plan was tested successfully during the provincial simulation exercise. Where regional hospitals work together to provide healthcare, it is beneficial to develop a standardized plan to provide guidance to hospital personnel in response to a blood supply shortage. A consistent plan will ensure patient care is provided in a consistent manner across a health region. Mock or simulation exercises can aid in testing plans and raising the awareness of stakeholders. Copyright © 2012 Elsevier Ltd. All rights reserved.
ERIC Educational Resources Information Center
Social and Rehabilitation Service (DHEW), Washington, DC.
The Social Work Education Planning and Assessment (SWEPA) System is an information system designed to function within social work education toward two main purposes: (1) to help schools more effectively specify their own educational objectives, plan their social work education projects to achieve these objectives, mark their progress toward this…
Guidelines for developing traffic incident management plans for work zones
DOT National Transportation Integrated Search
2003-09-01
The Colorado Department of Transportation (CDOT) has led the development of a number of traffic incident management plans and programs throughout the state. These programs address procedural and coordination aspects of managing unplanned events on th...
NASA Technical Reports Server (NTRS)
Yarbrough, Katherine
2015-01-01
During my internship I worked on two major projects, recommending improvements for the Center's Risk Management Workshop and helping with the strategic planning efforts for Safety and Mission Assurance (S&MA). The risk management improvements is the key project I worked on this semester through my internship, while the strategic planning is the secondary assignment. S&MA Business Office covers both aspects in its delegation, getting both spans some of the work done in the office. A risk is a future event with a negative consequence that has some probability of occurring. Safety and Mission Assurance identifies, analyzes, plans, and tracks risk. The directorate offers the Center a Risk Management Workshop, and part of the ongoing efforts of S&MA is to make continuous improvements to the RM Workshop. By using the Project Management Institute's (PMI) Standard for Risk Management, I performed a gap analysis to make improvements for our materials. I benchmarked the PMI's Risk Management Standard, compared our Risk Management Workshop materials to PMI's standard, and identified any gaps in our material. My major findings were presented to the Business Office of S&MA for a decision on whether or not to incorporate the improvements. These suggestions were made by attending JSC working group meetings, Health, Safety and Environment (HSE) panel reviews and various risk review meetings. The improvements provide better understanding of risk management processes and enhanced risk tracking knowledge and skills. Risk management is an integral part of any engineering discipline, getting exposed to this section of engineering will greatly help shape my career in the future. Johnson Space Center is a world leader in risk management processes; learning risk management here gives me a huge advantage over my peers, as well as understanding decision making in the context of risk management will help me to be a well-rounded engineer. Strategic planning is an area I had not previously studied. Helping with the strategic planning efforts in S&MA has taught me how organizations think and function as a whole. S&MA is adopting a balanced scorecard approach to strategic planning. As part of this planning method strategic themes, objectives, and initiatives are formed. I attended strategic theme team workshops that formed the strategy map for the directorate and gave shape to the plan. Also during these workshops the objectives were discussed and built. Learning the process for strategic planning has helped me better understand how organizations and businesses function, which also helps me to be a more effective employee. Other assignments I had during my internship included completing the Safety and Mission Assurance Technical Excellent Program (STEP) Level 1, as well as doing a two week rotation through the Space Exploration division in S&MA, specifically working with a thermal protection systems (TPS) engineer. While working there, I learned about the Orion capsule and the SpaceX Dragon cargo capsule. I attended meetings to prepare the engineers for the upcoming Critical Design Reviews for both capsules and reviewed test data. Learning risk management, strategic planning, and working in the Space Exploration division has taught me about many aspects of S&MA. My internship at NASA has given me new experiences and taught me numerous subjects that I would have otherwise not learned. This opportunity has expanded my educational horizons and is helping me to become a more useful engineer and employee.
Institutionalization of Planned Organizational Change,
1978-09-01
organizational change in the context of labor- management relations. One of their basic arguments is that the company and management have conflicting...planned organizational interventions. From the modest number of empirical studies on planned organizational change in a union- management context...new forms of work organization have emphasized the need to increase our understanding of oraganizational change processes. This paper has elaborated
NASA Astrophysics Data System (ADS)
Liu, Zhijun; Zhang, Liangpei; Liu, Zhenmin; Jiao, Hongbo; Chen, Liqun
2008-12-01
In order to manage the internal resources of Gulf of Tonkin and integrate multiple-source spatial data, the establishment of region unified plan management system is needed. The data fusion and the integrated research should be carried on because there are some difficulties in the course of the system's establishment. For example, kinds of planning and the project data format are different, and data criterion is not unified. Besides, the time state property is strong, and spatial reference is inconsistent, etc. In this article the ARCGIS ENGINE is introduced as the developing platform, key technologies are researched, such as multiple-source data transformation and fusion, remote sensing data and DEM fusion and integrated, plan and project data integration, and so on. Practice shows that the system improves the working efficiency of Guangxi Gulf of Tonkin Economic Zone Management Committee significantly and promotes planning construction work of the economic zone remarkably.
Becoming an effective clinical engineering or biomedical technology manager.
Brush, L C
1992-01-01
The BMET or CE Supervisor is a technical manager who is close to the actual work of a biomedical or clinical engineering department. The MPTI is a management training tool that has identified differences between the effective and less-effective technical managers. These behaviors or styles can be considered and applied to the clinical engineering and BMET work environments. Effective BMET or CE Supervisors have a management identity. They are both people-oriented and task-oriented. They are good problem-solvers, and will plan and structure the work tasks and environment. When the situation requires a change in plans, however, they can adapt to the new situation easily. If a decision needs to be made that affects the organization, they will check with higher management or peer managers. Less-effective BMET or CE Supervisors will make important decisions alone, without checking with others. They plan and structure tasks and the work environment, but they are less willing to change when faced with a new situation. They are not people-oriented, and their ability to assess social situations is low. Their need for achievement recognition is often too high. The work environment has an effect on how the competence of a manager is perceived. A "one-desk manager" in a small, one-person biomedical engineering department has more autonomy than a CE Supervisor in a large department. Working for a medical device manufacturing firm often requires a greater management identity. An engineering consultant is often a managing specialist, rather than a traditional manager.(ABSTRACT TRUNCATED AT 250 WORDS)
Implementing Earned Value Management in the CxP EVA Systems Project Office
NASA Technical Reports Server (NTRS)
Sorge, Les L.
2009-01-01
Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.
Petrunoff, Nick; Rissel, Chris; Wen, Li Ming
2017-01-01
After having conducted two studies of the effectiveness of workplace travel plans for promoting active travel, we investigated health and transport practitioners' perspectives on implementing workplace travel plans to share some of the lessons learnt. The objectives of this study were to describe perceived elements of effective workplace travel plans, barriers and enablers to workplace travel planning, their experiences of working with the other profession on travel plan implementation, their recommendations for workplace travel planning, and also to explore similarities and differences in transport and health practitioner perspectives. Fourteen health and ten transport practitioners who had prior involvement in workplace travel plan programs were purposefully selected from workplaces in Australia. We conducted 20 in-depth interviews since data saturation had been reached at this point, and data were subject to framework analysis. Perceived essential elements of effective workplace travel plans included parking management; leadership, organisational commitment and governance; skills and other resources like a dedicated travel plan coordinator; and, pre-conditions including supportive transport infrastructure in the surrounds. Recommendations for promoting travel plans included supportive government policy, focusing on business benefits and working at different scales of implementation (e.g. single large worksites and business precincts). Health and transport practitioner perspectives differed, with transport practitioners believing that parking management is the key action for managing travel demand at a worksite. Health practitioners implementing travel plans may require training including concepts of travel demand management, and support from transport planners on parking management strategies. Promoting an understanding of the shared travel behaviour change skills of transport and health practitioners may assist further collaboration. For take-up by organisations to be of sufficient scale to create meaningful population level reductions in driving and increases in active travel, promotion and travel plans should be focused on the priorities of the organisations. Supportive government policy is also required.
Rissel, Chris; Wen, Li Ming
2017-01-01
Objectives After having conducted two studies of the effectiveness of workplace travel plans for promoting active travel, we investigated health and transport practitioners’ perspectives on implementing workplace travel plans to share some of the lessons learnt. The objectives of this study were to describe perceived elements of effective workplace travel plans, barriers and enablers to workplace travel planning, their experiences of working with the other profession on travel plan implementation, their recommendations for workplace travel planning, and also to explore similarities and differences in transport and health practitioner perspectives. Materials and Methods Fourteen health and ten transport practitioners who had prior involvement in workplace travel plan programs were purposefully selected from workplaces in Australia. We conducted 20 in-depth interviews since data saturation had been reached at this point, and data were subject to framework analysis. Results Perceived essential elements of effective workplace travel plans included parking management; leadership, organisational commitment and governance; skills and other resources like a dedicated travel plan coordinator; and, pre-conditions including supportive transport infrastructure in the surrounds. Recommendations for promoting travel plans included supportive government policy, focusing on business benefits and working at different scales of implementation (e.g. single large worksites and business precincts). Health and transport practitioner perspectives differed, with transport practitioners believing that parking management is the key action for managing travel demand at a worksite. Conclusions Health practitioners implementing travel plans may require training including concepts of travel demand management, and support from transport planners on parking management strategies. Promoting an understanding of the shared travel behaviour change skills of transport and health practitioners may assist further collaboration. For take-up by organisations to be of sufficient scale to create meaningful population level reductions in driving and increases in active travel, promotion and travel plans should be focused on the priorities of the organisations. Supportive government policy is also required. PMID:28135301
China Report, Economic Affairs
1987-01-28
further that while relaxing control over the microeconomy , we must make corresponding improvements in the work of planned management and stretigthen...borne out by practice that in the course of reforming the economic structure, it is necessary to further invigorate the microeconomy while...the microeconomy . This is the current new task for planned management. The establishment of a new system of planned management that suits the commodity
NASA Astrophysics Data System (ADS)
Goldberg, G.; McClintock, W.
2016-12-01
Effective interagency and cross-sector coordination is essential to ecosystem based management which depends on processes characterized by collaboration and science-based information. Many technological barriers that exist in the development of science-based management plans are closely tied to process challenges, such as the sharing of data and information or the inclusion of parties with varied levels of technical experience. The Channel Islands National Marine Sanctuary has convened a diverse working group to develop recommendations for the management of marine shipping in and around the Santa Barbara Channel, as well as recommendations regarding research needs and outreach strategies. Working group members take a multi-issue approach with four distinct goals related to the reduction of ship strikes on whales, emissions and air quality, conflicting ocean uses, and issues of navigational safety. Members range from industry representatives, scientists, and multiple local and federal government entities. The recommended management plans will be based in the best-available science, and will build off of previous efforts, making this an interesting case study of adaptive management. In addition to support from the Sanctuary and professional facilitators, the group is using a decision-support platform, SeaSketch (safepassage.seasketch.org). SeaSketch is a web-based GIS that supports collaborative science-based marine spatial planning (MSP). Each feature supports a step of the MSP process, from data gathering, identification of data needs, the design of spatial plans, evaluation of those plans with analytics, and map-based forums that facilitate data-driven discussions. Working group members are able to access these tools to explore management options and collaborate remotely, in addition to using the platform during in-person meetings and webinars. Empowering diverse audiences to engage in the design of science-based plans is of key importance to developing ecosystem-based management plans where multi-sector participation and inter-agency coordination are critical.
NASA Astrophysics Data System (ADS)
Goldberg, G.; McClintock, W.
2016-02-01
Effective interagency and cross-sector coordination is essential to ecosystem based management which depends on processes characterized by collaboration and science-based information. Many technological barriers that exist in the development of science-based management plans are closely tied to process challenges, such as the sharing of data and information or the inclusion of parties with varied levels of technical experience. The Channel Islands National Marine Sanctuary has convened a diverse working group to develop recommendations for the management of marine shipping in and around the Santa Barbara Channel, as well as recommendations regarding research needs and outreach strategies. Working group members take a multi-issue approach with four distinct goals related to the reduction of ship strikes on whales, emissions and air quality, conflicting ocean uses, and issues of navigational safety. Members range from industry representatives, scientists, and multiple local and federal government entities. The recommended management plans will be based in the best-available science, and will build off of previous efforts, making this an interesting case study of adaptive management. In addition to support from the Sanctuary and professional facilitators, the group is using a decision-support platform, SeaSketch (safepassage.seasketch.org). SeaSketch is a web-based GIS that supports collaborative science-based marine spatial planning (MSP). Each feature supports a step of the MSP process, from data gathering, identification of data needs, the design of spatial plans, evaluation of those plans with analytics, and map-based forums that facilitate data-driven discussions. Working group members are able to access these tools to explore management options and collaborate remotely, in addition to using the platform during in-person meetings and webinars. Empowering diverse audiences to engage in the design of science-based plans is of key importance to developing ecosystem-based management plans where multi-sector participation and inter-agency coordination are critical.
Transit management certificate program.
DOT National Transportation Integrated Search
2012-07-01
TTI worked closely with the Landscape Architecture and Urban Planning Department : (LAUP) of Texas A&M University (TAMU) to develop a transit management certificate : focus for the current Graduate Certificate in Transportation Planning (CTP) housed ...
Interference due to shared features between action plans is influenced by working memory span.
Fournier, Lisa R; Behmer, Lawrence P; Stubblefield, Alexandra M
2014-12-01
In this study, we examined the interactions between the action plans that we hold in memory and the actions that we carry out, asking whether the interference due to shared features between action plans is due to selection demands imposed on working memory. Individuals with low and high working memory spans learned arbitrary motor actions in response to two different visual events (A and B), presented in a serial order. They planned a response to the first event (A) and while maintaining this action plan in memory they then executed a speeded response to the second event (B). Afterward, they executed the action plan for the first event (A) maintained in memory. Speeded responses to the second event (B) were delayed when it shared an action feature (feature overlap) with the first event (A), relative to when it did not (no feature overlap). The size of the feature-overlap delay was greater for low-span than for high-span participants. This indicates that interference due to overlapping action plans is greater when fewer working memory resources are available, suggesting that this interference is due to selection demands imposed on working memory. Thus, working memory plays an important role in managing current and upcoming action plans, at least for newly learned tasks. Also, managing multiple action plans is compromised in individuals who have low versus high working memory spans.
ERIC Educational Resources Information Center
Yelken, Tugba Yanpar; Kilic, Figen; Ozdemir, Caner
2012-01-01
In recent years, strategic planning has become one of the subjects that many institutions work on to ensure the institutions' appropriate management based on realistic results. Therefore, this planning has to be taken into account and should provide planning direction on the bases of its results. Basically, the manager of strategic planning,…
Configuration Management Plan for the Tank Farm Contractor
DOE Office of Scientific and Technical Information (OSTI.GOV)
WEIR, W.R.
The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in themore » management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.« less
... AAP Find a Pediatrician Family Life Medical Home Health Insurance Pediatric Specialists Family Dynamics Media Work & Play Getting ... Your Community Healthy Children > Family Life > Medical Home > Health Insurance > Types of Managed Care Plans Family Life Listen ...
Sample transportation management plans and templates.
DOT National Transportation Integrated Search
2010-08-01
This Guide consisting of samples, templates, and tips is designed to help transportation agencies with the : development and implementation of their own Transportation Management Plans (TMPs). Understanding : the work zone impacts is critical to deve...
Birmingham, Jackie
2004-01-01
Discharge planning is a legally mandated function for hospitals and is one of the "basic" hospital roles as outlined in Medicare's Conditions of Participation. This article will define discharge planning; describe the steps in the discharge planning process; list rules and regulations that influence discharge planning in hospitals; and compare hospital-based actions with payer-based actions when planning discharges. Case managers who work for payers interact with hospital-based case managers to facilitate the discharge planning process for patients. Those who form this patient-provider-payer triangle will benefit by reviewing the dynamics of the discharge planning process.
23 CFR 630.1012 - Project-level procedures.
Code of Federal Regulations, 2014 CFR
2014-04-01
... PRECONSTRUCTION PROCEDURES Work Zone Safety and Mobility § 630.1012 Project-level procedures. (a) This section provides guidance and establishes procedures for States to manage the work zone impacts of individual projects. (b) Transportation Management Plan (TMP). A TMP consists of strategies to manage the work zone...
23 CFR 630.1012 - Project-level procedures.
Code of Federal Regulations, 2013 CFR
2013-04-01
... PRECONSTRUCTION PROCEDURES Work Zone Safety and Mobility § 630.1012 Project-level procedures. (a) This section provides guidance and establishes procedures for States to manage the work zone impacts of individual projects. (b) Transportation Management Plan (TMP). A TMP consists of strategies to manage the work zone...
23 CFR 630.1012 - Project-level procedures.
Code of Federal Regulations, 2012 CFR
2012-04-01
... PRECONSTRUCTION PROCEDURES Work Zone Safety and Mobility § 630.1012 Project-level procedures. (a) This section provides guidance and establishes procedures for States to manage the work zone impacts of individual projects. (b) Transportation Management Plan (TMP). A TMP consists of strategies to manage the work zone...
23 CFR 630.1012 - Project-level procedures.
Code of Federal Regulations, 2011 CFR
2011-04-01
... PRECONSTRUCTION PROCEDURES Work Zone Safety and Mobility § 630.1012 Project-level procedures. (a) This section provides guidance and establishes procedures for States to manage the work zone impacts of individual projects. (b) Transportation Management Plan (TMP). A TMP consists of strategies to manage the work zone...
Planning and managing future space facility projects. [management by objectives and group dynamics
NASA Technical Reports Server (NTRS)
Sieber, J. E.; Wilhelm, J. A.; Tanner, T. A.; Helmreich, R. L.; Burgenbauch, S. F.
1979-01-01
To learn how ground-based personnel of a space project plan and organize their work and how such planning and organizing relate to work outcomes, longitudinal study of the management and execution of the Space Lab Mission Development Test 3 (SMD 3) was performed at NASA Ames Research Center. A view of the problems likely to arise in organizations and some methods of coping with these problems are presented as well as the conclusions and recommendations that pertain strictly to SMD 3 management. Emphasis is placed on the broader context of future space facility projects and additional problems that may be anticipated. A model of management that may be used to facilitate problem solving and communication - management by objectives (MBO) is presented. Some problems of communication and emotion management that MBO does not address directly are considered. Models for promoting mature, constructive and satisfying emotional relationships among group members are discussed.
Use of risk assessment panels during revision of the Tongass Land and Resource Management Plan.
Charles G. Shaw
1999-01-01
This paper describes the process used to conduct the 16 risk assessment panels and a subsistence working group held during revision of the Tongass land management plan. It provides an overview of how results from the panels were used by forest managers in plan-related decisionmaking, discusses some reactions to the effort, and identifies some opportunities to improve...
New Jersey interagency emergency management plan.
DOT National Transportation Integrated Search
2005-09-01
This report outlines the research and work performed to lay the foundation for the : development of a New Jersey Interagency Emergency Management Plan. The : research into existing practices within the four state level transportation agencies : revea...
ERIC Educational Resources Information Center
Bhola, H. S.
Addressed to professionals involved in program evaluation, this working paper covers various aspects of evaluation planning, including the following: planning as a sociotechnical process, steps in evaluation planning, program planning and implementation versus evaluation planning and implementation, the literacy system and its subsystems, and some…
FY 95 engineering work plan for the design reconstitution implementation action plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bigbee, J.D.
Design reconstitution work is to be performed as part of an overall effort to upgrade Configuration Management (CM) at TWRS. WHC policy is to implement a program that is compliant with DOE-STD-1073-93, Guide for Operational Configuration Management Program. DOE-STD-1073 requires an adjunct program for reconstituting design information. WHC-SD-WM-CM-009, Design Reconstitution Program Plan for Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System, is the TWRS plan for meeting DOE-STD-1073 design reconstitution requirements. The design reconstitution plan is complex requiring significant time and effort for implementation. In order to control costs, and integrate the work into other TWRS activities,more » a Design Reconstitution Implementation Action Plan (DR IAP) will be developed, and approved by those organizations having ownership or functional interest in this activity.« less
Functional Behavioral Assessments and Behavior Support Plans for Work-Based Learning
ERIC Educational Resources Information Center
Kittelman, Angus; Wagner Bromley, Katherine; Mazzotti, Valerie L.
2016-01-01
Work experiences are linked to positive post-school outcomes for youth and young adults with disabilities. Unfortunately, students who struggle to manage conflict and challenges in work settings have a difficult time maintaining employment. Though ecological assessments are used to create supported work plans surrounding socially inappropriate…
Emergent issues in forest plan revision: a dialogue
Susan I. Stewart; Pamela J. Jakes; Paul Monson
1998-01-01
Working with National Forest planners can raise many questions for social scientists regarding their role in planning or plan revision. Social scientists from the North Central Forest Experiment Station and the National Forest System Eastern Region debate 3 questions that continue to surface in their work with Forest Service managers on plan revision: first, what is...
Traffic flow characteristic and capacity in intelligent work zones.
DOT National Transportation Integrated Search
2009-10-15
Intellgent transportation system (ITS) technologies are utilized to manage traffic flow and safety in : highway work zones. Traffic management plans for work zones require queuing analyses to determine : the anticipated traffic backups, but the predi...
Responsibility for retirement planning shifts to employees.
Van Gelder, N
1994-08-01
In recent years, organizations have shifted away from offering their employees defined benefit plans that promise specified income streams to employees when they retire. Instead, they are offering employees defined contribution plans, which rely on investment performance, as directed by plan participants, to generate sufficient retirement income. Healthcare financial managers who work in organizations that offer retirement plans for their employees find themselves increasingly prevailed upon to play the role of instructor to plan participants. While some financial managers may not relish the role, the more successful financial managers are at helping plan participants achieve their retirement income goals, the better the chance of healthcare organizations avoiding future liability problems.
1999-12-01
agreement, on a reimbursable basis. This includes franchise funds, revolving funds and working capital funds. Management Plan.—The Management Plan...Operation of cafeterias, mess halls, kitchens, bakeries , dairies, and commissaries • Vending machines • Ice and water HEALTH SERVICES • Surgical
Data categories for marine planning
Lightsom, Frances L.; Cicchetti, Giancarlo; Wahle, Charles M.
2015-01-01
The U.S. National Ocean Policy calls for a science- and ecosystem-based approach to comprehensive planning and management of human activities and their impacts on America’s oceans. The Ocean Community in Data.gov is an outcome of 2010–2011 work by an interagency working group charged with designing a national information management system to support ocean planning. Within the working group, a smaller team developed a list of the data categories specifically relevant to marine planning. This set of categories is an important consensus statement of the breadth of information types required for ocean planning from a national, multidisciplinary perspective. Although the categories were described in a working document in 2011, they have not yet been fully implemented explicitly in online services or geospatial metadata, in part because authoritative definitions were not created formally. This document describes the purpose of the data categories, provides definitions, and identifies relations among the categories and between the categories and external standards. It is intended to be used by ocean data providers, managers, and users in order to provide a transparent and consistent framework for organizing and describing complex information about marine ecosystems and their connections to humans.
ERIC Educational Resources Information Center
Smylie, Patrick E.; Jacobs, Ronald L.
A study was conducted to describe the present status of self-managed work groups in Ohio manufacturing companies. Data for the study were gathered through lengthy interviews and site visits with 45 manufacturing companies in the state, 24 employing 2,000-14,000 workers and 21 employing 300 to 1,900 workers. The results of the study are presented…
Managed Care Plans: Getting Good Care for Your Child
... AAP Find a Pediatrician Family Life Medical Home Health Insurance Pediatric Specialists Family Dynamics Media Work & Play Getting ... Your Community Healthy Children > Family Life > Medical Home > Health Insurance > Managed Care Plans: Getting Good Care for Your ...
Contracts and Management Services FY 1996 Site Support Program Plan: WBS 6.10.14. Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Knoll, J.M. Jr.
1995-09-01
This is the Contracts and Management Services site support program plan for the US DOE Hanford site. The topics addressed in the program plan include a mission statement, program objectives, planning assumptions, program constraints, work breakdown structure, milestone list, milestone description sheets, and activity detail including cost accounting narrative summary, approved funding budget, and activity detailed description.
Evans, Stewart M; Gebbels, Susan; Stockill, Joanna M
2008-01-01
The objective of this project was to empower people of Blyth Valley in Northumberland (northeast England) to contribute to the management of their coastal heritage. A group of volunteers, the Links Conservation Group, working in collaboration with the environmental managers (Blyth Valley Borough Council), scientists, local specialists and other volunteers, surveyed the biodiversity, social, cultural and industrial history and profiles of the dunes, as well as their perceived value to local residents. The Group used this information to develop management plans for the dunes. The recommendations have contributed to planning processes at three levels: (i) national coastal management plans; (ii) regional plans; and (iii) plans for further action at the local community level.
Automated Procurement System (APS): Project management plan (DS-03), version 1.2
NASA Technical Reports Server (NTRS)
Murphy, Diane R.
1994-01-01
The National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC) is implementing an Automated Procurement System (APS) to streamline its business activities that are used to procure goods and services. This Project Management Plan (PMP) is the governing document throughout the implementation process and is identified as the APS Project Management Plan (DS-03). At this point in time, the project plan includes the schedules and tasks necessary to proceed through implementation. Since the basis of APS is an existing COTS system, the implementation process is revised from the standard SDLC. The purpose of the PMP is to provide the framework for the implementation process. It discusses the roles and responsibilities of the NASA project staff, the functions to be performed by the APS Development Contractor (PAI), and the support required of the NASA computer support contractor (CSC). To be successful, these three organizations must work together as a team, working towards the goals established in this Project Plan. The Project Plan includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.
The Project Manager Who Saved His Country
NASA Technical Reports Server (NTRS)
Baniszewski, John
2008-01-01
George Meade defeated Robert E. Lee, one of the greatest military leaders of all time. How did he do it? By using the skills he had learned as a project manager and outperforming Lee in all aspects of project management. Most project managers are familiar with the Project Management Institute's "Guide to the Project Management Body of Knowledge" (PMBOK), which identifies the skills and knowledge crucial to successful project management. Project managers need to make sure that all the elements of a project work together. They must develop and execute plans and coordinate changes to those plans. A project manager must define the scope of the work, break it into manageable pieces, verify and control what work is being done, and make sure that the work being done is essential to the project. Every project manager knows the challenges of schedule and the value of schedule slack. Project managers must get the resources they need and use them effectively. Project managers get the people they need and use their talents to achieve mission success. Projects generate huge amounts of information. A key to project success is getting sufficient and accurate information to the people who need it when they need it. Project managers must identify and quantify the risks that jeopardize project success and make plans for dealing with them. Studying Meade and Lee's performances at Gettysburg can help modern project managers appreciate, develop, and use the skills they need to be good project managers. The circumstances may be different, but the basic principles are the same. This dramatic event in American history shows how the skills of project management can be used in almost any situation. Former project manager George Meade used those skills to change the tide of the Civil War.
The Battlefield Commander’s Assistant Project: Research in Terrain Reasoning
1987-05-22
order dissemination. In order to restrict the survey problem to a manageable level, we made the a priori decision to focus on activities related to...models Manages tools for: Conmander , tactical a explanations * situation assessment1Lplans s plan and plan option " a query/edit capabilities...from our work on the Air Land Battle Management Study ( ’Stachnick 87:) which was tasked to compare Al planning techniques with the requirements of
76 FR 22142 - Notice of Public Meeting, Northwest Colorado Resource Advisory Council Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-20
... Strategy, working group reports, recreation, fire management, land use planning, invasive species management, energy and minerals management, travel management, wilderness, wild horse herd management, land...
Work and Family: How Managers Can Make a Difference.
ERIC Educational Resources Information Center
Collins, Ray; Magid, Renee Y.
1990-01-01
The work-family audit is a framework for employer planning of work-family policies and programs. The audit identifies key aspects of the labor force and community. Steps are identifying options, specifying objectives, planning for implementation, stating outcomes and benefits, and preparing to measure costs and benefits. (SK)
77 FR 19319 - Notice of Public Meeting, Northwest Colorado Resource Advisory Council Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-30
... Conservation Strategy, working group reports, recreation, fire management, land-use planning, invasive species management, energy and minerals management, travel management, wilderness, wild horse herd management, land...
Nine steps towards a better water meter management.
Arregui, F J; Soriano, J; Cabrera, E; Cobacho, R
2012-01-01
The paper provides a comprehensive perspective of the critical aspects to be taken into account when planning the long-term management of water meters in a utility. In order to facilitate their quick understanding and practical implementation, they have been structured into nine steps. Ranging from an initial audit up to the final periodic meter replacement planning, these steps cover three aspects of the problem - field work, laboratory work and management tasks; and each one is developed in detail paying attention to the particular data needed and noting the practical outcome it will yield.
Resource Management in the Microgravity Science Division
NASA Technical Reports Server (NTRS)
Casselle, Justine
2004-01-01
In the Microgravity Science Division, the primary responsibilities of the Business Management Office are resource management and data collection. Resource management involves working with a budget to do a number of specific projects, while data collection involves collecting information such as the status of projects and workforce hours. This summer in the Business Management Office I assisted Margie Allen with resource planning and the implementation of specific microgravity projects. One of the main duties of a Project Control Specialists, such as my mentor, is to monitor and analyze project manager s financial plans. Project managers work from the bottom up to determine how much money their project will cost. They then set up a twelve month operating plan which shows when money will be spent. I assisted my mentor in checking for variances in her data against those of the project managers. In order to successfully check for those variances, we had to understand: where the project is including plans vs. actual performance, why it is in its present condition, and what the future impact will be based on known budgetary parameters. Our objective was to make sure that the plan, or estimated resources input, are a valid reflection of the actual cost. To help with my understanding of the process, over the course of my tenure I had to obtain skills in Microsoft Excel and Microsoft Access.
Charles G. Shaw; Fred H. Everest; Douglas N. Swanston
2000-01-01
An innovative, knowledge-based partnership between research scientists and resource managers in the U.S. Forest Service provided the foundation upon which the Forest Plan was developed that will guide management on the Tongass National Forest for the next 10-15 years. Criteria developed by the scientists to evaluate if management decisions were consistent with the...
40 CFR 35.925-2 - Water quality management plans and agencies.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Water quality management plans and agencies. 35.925-2 Section 35.925-2 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-2 Water quality management...
Traffic incident management in construction and maintenance work zones.
DOT National Transportation Integrated Search
2009-01-01
In 2004, the Federal Highway Administration published updated rules governing work zone safety and mobility; all highway construction and maintenance projects using federal-aid highway funds are required to develop transportation management plans (TM...
78 FR 66379 - Notice of Public Meeting, Northwest Colorado Resource Advisory Council Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-05
... Sage-Grouse Conservation Strategy, working group reports, recreation, fire management, land use planning, invasive species management, energy and minerals management, travel management, wilderness, wild...
Lunar-Ultraviolet Telescope Experiment (LUTE) integrated program plan
NASA Technical Reports Server (NTRS)
Smith, Janice F. (Compiler); Forrest, Larry
1993-01-01
A detailed Lunar Ultraviolet Telescope Experiment (LUTE) program plan representing major decisions and tasks leading to those decisions for program execution are presented. The purpose of this task was to develop an integrated plan of project activities for the LUTE project, and to display the plan as an integrated network that shows the project activities, all critical interfaces, and schedules. The integrated network will provide the project manager with a frame work for strategic planning and risk management throughout the life of the project.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) to be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This revision is a complete update to cover the FY 1994 time period. This document describes the overall ER Missions Area and provides FYWP appendices for each of the following five program areas: Remedial Action (RA); Decontamination and Decommissioning (D&D); Project Management and Support (PM&S); Surveillance and Maintenance (S&M); and Disposal Facilities (DF).
Natural Resource Management Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Green, T.; Schwager, K.
This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265-acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 15 years by the Naturalmore » Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan works toward sound ecological management that not only benefits BNL’s ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text.« less
Risk identification and reduction in integrated product teams
NASA Technical Reports Server (NTRS)
Batson, Robert G.
1993-01-01
This brief report summarizes research and planning conducted during Summer 1993 for MSFC on the subjects of risk identification, assessment, and management. Research findings are presented, citing useful references. The major output of this work, the AXAF-S Project Risk Management Plan is outlined.
Nursery management [Chapter 16
Kim M. Wilkinson
2009-01-01
This handbook provides an overview of the factors that go into starting and operating a native plant nursery. Management includes all aspects of working with plants in all their phases of growth as described in Chapter 3, Crop Planning and Developing Propagation Protocols. Management also includes working with the community; organizing materials and infrastructure;...
2016-08-05
Department of Defense Report No. DODIG-2016-118 A U G U S T 5 , 2 0 1 6 Army Justified Initial Production Plan for the Paladin Integrated Management... model oversight organization in the Federal Government by leading change, speaking truth, and promoting excellence—a diverse organization, working...DODIG-2016-118 (Project No. D2016-D000AU-0003.000) │ i Results in Brief Army Justified Initial Production Plan for the Paladin Integrated Management
Successful healthcare programs and projects: organization portfolio management essentials.
Pickens, Scott; Solak, Jamie
2005-01-01
Many healthcare organization projects take more time and resources than planned and fail to deliver desired business outcomes. Healthcare IT is a major component of many projects and often undeservedly receives the blame for failure. Poor results are often not a result of faulty healthcare IT or poor project management or poor project execution alone. Many projects fail because of poor portfolio management--poor planning and management of the portfolio of initiatives designed to meet an organization's strategic goals. Because resources are limited, portfolio management enables organizations to more strategically allocate and manage their resources so care delivery, service delivery, and initiatives that advance organizations toward their strategic goals, including healthcare IT initiatives, can be accomplished at the levels of quality and service desired by an organization. Proper portfolio management is the essential foundation for program and project success and supports overall organization success. Without portfolio management, even programs and projects that execute flawlessly may not meet desired objectives. This article discusses the essential requirements for porfolio management. These include opportunity identification, return on investment (ROI) forecast, project prioritization, capacity planning (inclusive of human, financial, capital, and facilities resources), work scheduling, program and project management and execution, and project performance and value assessment. Portfolio management is essential to successful healthcare project execution. Theories are drawn from the Organizational Project Management Maturity Model (OPM3) work of the Project Management Institute and other leading strategy, planning, and organization change management research institutes.
Time management in health care social work.
Sheridan, M S
1988-01-01
Health care social workers face significant problems in controlling and managing time. Among the causes are increased demands for service, economy measures in health care, and the concurrent responsibility which social workers often have for both ongoing case management and crisis coverage. Individuals and social work departments can increase productivity through streamlining case management, increasing use of available resources, and generating new resources. With planning and preparation, many emergencies can be moved into the expected work flow. The social work profession needs to address time management problems and expectations in a more realistic and systematic way.
Taylor, Bev; Roberts, Sue; Smyth, Therese; Tulloch, Moira
2015-10-01
To raise nurse managers' critical awareness of practice problems; uncover practice constraints and improve work effectiveness. Nurse management requires skills and knowledge, underscored by emotional intelligence. The research improved participants' practice and personal insights. Purposive sampling targeted nurse managers interested in improving their practice. Three experienced female nurse managers met fortnightly in a group, for 1 hour, for 10 meetings. The methods included: writing and sharing de-identified journal reflections; critically analysing practice stories; identifying a thematic concern; generating action strategies; and instituting and revising the action plan. Phase One resulted in the identification of the issue of 'being drained by the intensity of nurse managers' work'. The participants adopted five strategies: debriefing problematic situations; deflecting multiple requests; diffusing issues; naming dysfunctional behaviours; and regrouping. In Phase Two, participants implemented and revised the action plan strategies, which resulted in them feeling less drained by their work. Strategies can lessen nurse managers' sense of personal depletion. However, strategies cannot guarantee success every time because the emotional intelligence is integral to nurse management. Action research and reflection assist nurse managers to improve their practice and develop their emotional intelligence. © 2014 John Wiley & Sons Ltd.
Corazzini, Kirsten
2003-01-01
Objective To examine how case managers in a state-funded home care program allocate home care services in response to information about a client's Medicare home health care status, with particular attention to the influence of work environment. Data Sources/Study Setting Primary data collected on 355 case managers and 26 agency directors employed in June 1999 by 26 of the 27 regional agencies administering the Massachusetts Home Care Program for low-income elders. Study Design Data were collected in a cross-sectional survey study design. A case manager survey included measures of work environment, demographics, and factorial survey vignette clients (N=2,054), for which case managers assessed service eligibility levels. An agency director survey included measures of management practices. Data Collection/Extraction Methods Hierarchical linear models estimated the effects of work environment on the relationship between client receipt of Medicare home health care and care plan levels while controlling for case-mix differences in agencies' clients. Principal Findings Case managers did not supplement extant Medicare home health services, but did allocate more generous service plans to clients who have had Medicare home health care services recently terminated. This finding persisted when controlling for case mix and did not vary by work environment. Work environment affected overall care plan levels. Conclusions Study findings indicate systematic patterns of frontline resource allocation shaping the relationships among community-based long-term care payment sources. Further, results illustrate how nonuniform implementation of upper-level initiatives may be partially attributed to work environment characteristics. PMID:14596390
Planning and scheduling for success
NASA Technical Reports Server (NTRS)
Manzanera, Ignacio
1994-01-01
Planning and scheduling programs are excellent management tools when properly introduced to the project management team and regularly maintained. Communications, creativity, flexibility and accuracy are substantially improved by following a simple set of rules. A planning and scheduling program will work for you if you believe in it, make others in your project team realize its benefits, and make it an extension of your project cost control philosophy.
Somme, Dominique; Hébert, Réjean; Bravo, Gina; Blanchard, François; Saint-Jean, Olivier
2007-01-01
Introduction One aspect of clinical integration involves case managers' tools and particularly the individualized service plan. Methods We examined individualized service plan content and use in the PRISMA experiment. We analyzed 50 charts, and conducted and recorded interviews regarding individualized service plan use with all the case managers concerned (n=13). Results Delays between starting case management and writing the individualized service plan were long and varied (0–596 days, mean: 117 days). During the interviews, the individualized service plan was described as the ‘last step’ once the active planning phase was over. The reasons for formulating plans were mainly administrative. From a clinical viewpoint, individualized service plans were used as memoranda and not to describe services (842 interventions not mentioned in the plans) or needs (694 active problems not mentioned). Case managers felt uncomfortable with the individualized planning task and expected a tool more adapted to their needs. Conclusion Although a majority of the case managers' charts contained an individualized service plan, implementation of this tool seems tenuous. Because of the discrepancy between the potential usefulness expected by case managers and their actual use, a working committee was created to develop proposals for modifying the instrument. PMID:19503736
Fetterolf, Donald E; Terry, Rachel
2007-02-01
Oncologic conditions are ubiquitous medical illnesses that present a particular challenge for medical management programs designed to address quality and cost issues in patient populations. Disease management strategies represent a reasonable and effective approach for employers and health plans in their arsenal of health management strategies. Multiple reasons exist for the development of specialized disease management programs that deal with cancer patients, some unique to this group of individuals. Health plans and/or employers have solid justification for addressing these issues directly through programs developed specifically to work with cancer patients. Whether developed within a health plan, or "carved out" to an external vendor, proper evaluation of outcomes is essential.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lowes, Elizabeth A.
2012-07-01
Evaluating operational incidents can provide a window into the drivers most critical to establishing and maintaining a strong safety culture, thereby minimizing the potential project risk associated with safety incidents. By examining U.S. Department of Energy (DOE) versus U.S. Army drivers in terms of regulatory and contract requirements, programs implemented to address the requirements, and example case studies of operational events, a view of the elements most critical to making a positive influence on safety culture is presented. Four case studies are used in this evaluation; two from DOE and two from U.S. Army experiences. Although the standards guiding operationsmore » at these facilities are different, there are many similarities in the level of hazards, as well as the causes and the potential consequences of the events presented. Two of the incidents examined, one from a DOE operation and the other from a U.S. Army facility, resulted in workers receiving chemical burns. The remaining two incidents are similar in that significant conduct of operations failures occurred resulting in high-level radioactive waste (in the case of the DOE facility) or chemical agent (in the case of the Army facility) being transferred outside of engineering controls. A review of the investigation reports for all four events indicates the primary causes to be failures in work planning leading to ineffective hazard evaluation and control, lack of procedure adherence, and most importantly, lack of management oversight to effectively reinforce expectations for safe work planning and execution. DOE and Army safety programs are similar, and although there are some differences in contractual requirements, the expectations for safe performance are essentially the same. This analysis concludes that instilling a positive safety culture comes down to management leadership and engagement to (1) cultivate an environment that values a questioning attitude and (2) continually reinforce expectations for the appropriate level of rigor in work planning and procedure adherence. A review of the root causes and key contributing causes to the events indicate: - Three of the four root cause analyses cite lack of management engagement (oversight, involvement, ability to recognize issues, etc.) as a root cause to the events. - Two of the four root cause analyses cite work planning failures as a root cause to the events and all cause analyses reflect work planning failures as contributing factors to the events. - All events with the exception of the Tuba City plant shutdown indicate procedure noncompliance as a key contributor; in the case of Tuba City the procedure issues were primarily related to a lack of procedures, or a lack of sufficiently detailed procedures. - All events included discussion or suggestion of a lack of a questioning attitude, either on the part of management/supervision, work planners, or workers. This analysis suggests that the most critical drivers to safety culture are: - Management engagement, - Effective work planning and procedures, and - Procedure adherence with a questioning attitude to ensure procedural problems are identified and fixed. In high-hazard operational environments the importance of robust work planning processes and procedure adherence cannot be overstated. However, having the processes by themselves is not enough. Management must actively engage in expectation setting and ensure work planning that meets expectations for hazard analysis and control, develop a culture that encourages incident reporting and a questioning attitude, and routinely observe work performance to reinforce expectations for adherence to procedures/work control documents. In conclusion, the most critical driver to achieving a workforce culture that supports safe and effective project performance can be summarized as follows: 'Management engagement to continually reinforce expectations for work planning processes and procedure adherence in an environment that cultivates a questioning attitude'. (authors)« less
77 FR 7565 - North Pacific Fishery Management Council; Public Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-13
... North Pacific Fishery Management Council's (NPFMC) Scallop Plan Team (SPT). SUMMARY: The SPT will meet...; telephone: (907) 271-2809. SUPPLEMENTARY INFORMATION: The Plan Team will meet to discuss status of statewide... least 7 working days prior to the meeting date. Dated: February 8, 2012. Tracey L. Thompson, Acting...
Four years after the approval of its Comprehensive Conservation and Management Plan (CCMP), the San Juan Bay Estuary Program (SJBEP) is working towards the implementation stage of its 49 actions. During the last three years the program has focused its efforts in developing a coll...
Using computer software to improve group decision-making.
Mockler, R J; Dologite, D G
1991-08-01
This article provides a review of some of the work done in the area of knowledge-based systems for strategic planning. Since 1985, with the founding of the Center for Knowledge-based Systems for Business Management, the project has focused on developing knowledge-based systems (KBS) based on these models. In addition, the project also involves developing a variety of computer and non-computer methods and techniques for assisting both technical and non-technical managers and individuals to do decision modelling and KBS development. This paper presents a summary of one segment of the project: a description of integrative groupware useful in strategic planning. The work described here is part of an ongoing research project. As part of this project, for example, over 200 non-technical and technical business managers, most of them working full-time during the project, developed over 160 KBS prototype systems in conjunction with MBA course in strategic planning and management decision making. Based on replies to a survey of this test group, 28 per cent of the survey respondents reported their KBS were used at work, 21 per cent reportedly received promotions, pay rises or new jobs based on their KBS development work, and 12 per cent reported their work led to participation in other KBS development projects at work. All but two of the survey respondents reported that their work on the KBS development project led to a substantial increase in their job knowledge or performance.
Jack D. Fellows: Congressional Science Fellow
NASA Astrophysics Data System (ADS)
Jack D. Fellows has been selected as the 1983-84 AGU Congressional Science Fellow. Last week he began his 1-year stint on Capitol Hill as AGU's seventh Congressional Science Fellow.Fellows received his Ph.D. earlier this year from the civil engineering department at the University of Maryland, College Park. For his dissertation he developed a management system using regional geographic information for hydrologic models. His work applied remote sensing data to the decision-making processes of regional planning organizations concerned with hydrology and natural resource management. The Maryland National Capital Park and Planning Commission has integrated Fellows' work into their programs on water resource and environmental planning; his approach also is being used for forest and water resource planning near Freiburg, Baden-Wurtemberg, West Germany.
Issues in NASA Program and Project Management: Focus on Project Planning and Scheduling
NASA Technical Reports Server (NTRS)
Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)
1997-01-01
Topics addressed include: Planning and scheduling training for working project teams at NASA, overview of project planning and scheduling workshops, project planning at NASA, new approaches to systems engineering, software reliability assessment, and software reuse in wind tunnel control systems.
Analysis and preliminary design of Kunming land use and planning management information system
NASA Astrophysics Data System (ADS)
Li, Li; Chen, Zhenjie
2007-06-01
This article analyzes Kunming land use planning and management information system from the system building objectives and system building requirements aspects, nails down the system's users, functional requirements and construction requirements. On these bases, the three-tier system architecture based on C/S and B/S is defined: the user interface layer, the business logic layer and the data services layer. According to requirements for the construction of land use planning and management information database derived from standards of the Ministry of Land and Resources and the construction program of the Golden Land Project, this paper divides system databases into planning document database, planning implementation database, working map database and system maintenance database. In the design of the system interface, this paper uses various methods and data formats for data transmission and sharing between upper and lower levels. According to the system analysis results, main modules of the system are designed as follows: planning data management, the planning and annual plan preparation and control function, day-to-day planning management, planning revision management, decision-making support, thematic inquiry statistics, planning public participation and so on; besides that, the system realization technologies are discussed from the system operation mode, development platform and other aspects.
Managing Research in a Risk World
NASA Technical Reports Server (NTRS)
Anton, W.; Havenhill, M.
2014-01-01
The Office of Chief Medical Officer (OCHMO) owns all human health and performance risks managed by the Human System Risk Board (HSRB). While the HSRB manages the risks, the Human Research Program (HRP) manages the research portion of the overall risk mitigation strategy for these risks. The HSRB manages risks according to a process that identifies and analyzes risks, plans risk mitigation and tracks and reviews the implementation of these strategies according to its decisions pertaining to the OCHMO risk posture. HRP manages risk research work using an architecture that describes evidence-based risks, gaps in our knowledge about characterizing or mitigating the risk, and the tasks needed to produce deliverables to fill the gaps and reduce the risk. A planning schedule reflecting expected research milestones is developed, and as deliverables and new evidence are generated, research progress is tracked via the Path to Risk Reduction (PRR) that reflects a risk's research plan for a design reference mission. HRP's risk research process closely interfaces with the HSRB risk management process. As research progresses, new deliverables and evidence are used by the HSRB in conjunction with other operational and non-research evidence to inform decisions pertaining to the likelihood and consequence of the risk and risk posture. Those decisions in turn guide forward work for research as it contributes to overall risk mitigation strategies. As HRP tracks its research work, it aligns its priorities by assessing the effectiveness of its contributions and maintaining specific core competencies that would be invaluable for future work for exploration missions.
The public and wildland fire management: social science findings for managers
S.M. McCaffrey
2006-01-01
Presents key social science findings from three National Fire Plan-sponsored research projects. Articles highlight information of likely interest to individuals working to decrease wildfire hazards on both private and public lands. Three general topic areas are addressed: (1) public views and acceptance of fuels management, (2) working with homeowners and communities,...
75 FR 80470 - Pacific Fishery Management Council; Public Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-22
... Pacific Fishery Management Council's (Council) Groundfish Management Team (GMT) will hold a working... session is to review team roles and responsibilities, conduct workload planning for 2011, review the...
Using time management to achieve balance.
Schroeder, R E
1998-01-01
A recent MGMA survey showed work-life balance as the number one issue facing group practice managers. This article explains techniques from the field of time management that will enable group practice managers to gain control of their schedules, reduce time pressures and stress and increase productivity. The article covers: goal setting, daily lists, handling paperwork, delegating and limiting involvement, socializing, communicating, overachieving, planning, writing, telephone calling, attending meetings, reading, financial planning, developing a philosophy, involving family, evaluating skills and teaching time management to employees.
Wyoming Basin Rapid Ecoregional Assessment: Work Plan
Carr, Natasha B.; Garman, Steven L.; Walters, Annika; Ray, Andrea; Melcher, Cynthia P.; Wesner, Jeff S.; O’Donnell, Michael S.; Sherrill, Kirk R.; Babel, Nils C.; Bowen, Zachary H.
2013-01-01
The overall goal of the Rapid Ecoregional Assessments (REAs) being conducted for the Bureau of Land Management (BLM) is to provide information that supports regional planning and analysis for the management of ecological resources. The REA provides an assessment of baseline ecological conditions, an evaluation of current risks from drivers of ecosystem change, and a predictive capacity for evaluating future risks. The REA also may be used for identifying priority areas for conservation or restoration and for assessing the cumulative effects of a variety of land uses. There are several components of the REAs. Management Questions, developed by the BLM and partners for the ecoregion, identify the information needed for addressing land-management responsibilities. Conservation Elements represent regionally significant aquatic and terrestrial species and communities that are to be conserved and (or) restored. The REA also will evaluate major drivers of ecosystem change (Change Agents) currently affecting or likely to affect the status of Conservation Elements. We selected 8 major biomes and 19 species or species assemblages to be included as Conservation Elements. We will address the four primary Change Agents—development, fire, invasive species, and climate change—required for the REA. The purpose of the work plan for the Wyoming Basin REA is to document the selection process for, and final list of, Management Questions, Conservation Elements, and Change Agents. The work plan also presents the overall assessment framework that will be used to assess the status of Conservation Elements and answer Management Questions.
Results from a national survey on chronic care management by health plans.
Mattke, Soeren; Higgins, Aparna; Brook, Robert
2015-05-01
The growing burden of chronic disease necessitates innovative approaches to help patients and to ensure the sustainability of our healthcare system. Health plans have introduced chronic care management models, but systematic data on the type and prevalence of different approaches are lacking. Our goal was to conduct a systematic examination of chronic care management programs offered by health plans in the commercial market (ie, in products sold to employers and individuals. We undertook a national survey of a representative sample of health plans (70 plans, 36% response rate) and 6 case studies on health plans' programs to improve chronic care in the commercial market. The data underwent descriptive and bivariate analyses. All plans, regardless of size, location, and ownership, offer chronic care management programs, which identify eligible members from claims data and match them to interventions based on overall risk and specific care gaps. Plans then report information on care gaps to providers and offer self-management support to their members. While internal evaluations suggest that the interventions improve care and reduce cost, plans report difficulties in engaging members and providers. To overcome those obstacles, plans are integrating their programs into provider work flow, collaborating with providers on care redesign and leveraging patient support technologies. Our study shows that chronic care management programs have become a standard component of the overall approach used by health plans to manage the health of their members.
Lessons from disaster: Creating a business continuity plan that really works.
Hatton, Tracy; Grimshaw, Eleanor; Vargo, John; Seville, Erica
Business Continuity Planning (BCP) is well established as a key plank in an organisation's risk management process. But how effective is BCP when disaster strikes? This paper examines the experiences of organisations following the 2010-11 Canterbury, New Zealand earthquakes. The study finds that BCP was helpful for all organisations interviewed but more attention is needed on the management of societal and personal impacts; development of employee resilience, identification of effective crisis leaders; right-sizing plans and planning to seize opportunities post-disaster.
Building the IOOS data management subsystem
de La Beaujardière, J.; Mendelssohn, R.; Ortiz, C.; Signell, R.
2010-01-01
We discuss progress to date and plans for the Integrated Ocean Observing System (IOOS??) Data Management and Communications (DMAC) subsystem. We begin by presenting a conceptual architecture of IOOS DMAC. We describe work done as part of a 3-year pilot project known as the Data Integration Framework and the subsequent assessment of lessons learned. We present work that has been accomplished as part of the initial version of the IOOS Data Catalog. Finally, we discuss near-term plans for augmenting IOOS DMAC capabilities.
Renschler, Lauren A; Terrigino, Elizabeth A; Azim, Sabiya; Snider, Elsa; Rhodes, Darson L; Cox, Carol C
2016-06-01
A brief emergency planning educational presentation was taught during work hours to a convenience sample of employees of various workplaces in Northern Missouri, USA. Participants were familiarized with details about how an emergency plan is prepared by management and implemented by management-employee crisis management teams - focusing on both employee and management roles. They then applied the presentation information to assess their own organization's emergency preparedness level. Participants possessed significantly (p < 0.05) higher perceptions of their organization's level of emergency preparedness than non-participants. It is recommended that an assessment of organizational preparedness level supplement emergency planning educational presentations in order to immediately apply the material covered and encourage employees to become more involved in their organization's emergency planning and response. Educational strategies that involve management-employee collaboration in activities tailored to each workplace's operations and risk level for emergencies should be implemented.
Climate Change and Water Working Group - User Needs to Manage Hydrclimatic Risk from Days to Decades
NASA Astrophysics Data System (ADS)
Raff, D. A.; Brekke, L. D.; Werner, K.; Wood, A.; White, K. D.
2012-12-01
The Federal Climate Change Water Working Group (CCAWWG) provides engineering and scientific collaborations in support of water management. CCAWWG objectives include building working relationships across federal science and water management agencies, provide a forum to share expertise and leverage resources, develop education and training forums, to work with water managers to understand scientific needs and to foster collaborative efforts across the Federal and non-Federal water management and science communities to address those needs. Identifying and addressing water management needs has been categorized across two major time scales: days to a decade and multi-decadal, respectively. These two time periods are termed "Short-Term" and "Long-Term" in terms of the types of water management decisions they support where Short-Term roughly correlates to water management operations and Long-Term roughly correlates to planning activities. This presentation will focus on portraying the identified water management user needs across these two time periods. User Needs for Long-Term planning were identified in the 2011 Reclamation and USACE "Addressing Climate Change in Long-Term Water Resources Planning and Management: User Needs for Improving Tools and Information." User needs for Long-Term planning are identified across eight major categories: Summarize Relevant Literature, Obtain Climate Change Information, Make Decisions About How to Use the Climate Change Information, Assess Natural Systems Response, Assess Socioeconomic and Institutional Response, Assess System Risks and Evaluate Alternatives, Assess and Characterize Uncertainties, and Communicating Results and Uncertainties to Decisionmakers. User Needs for Short-Term operations are focused on needs relative to available or desired monitoring and forecast products from the hydroclimatic community. These needs are presenting in the 2012 USACE, Reclamation, and NOAA - NWS "Short-Term Water Management Decisions: User Needs for Improved Climate, Weather, and Hydrologic Information." Identified needs are presented in four categories: Monitoring, Forecasting, Understanding on Product Relationships and Utilization in Water Management, and Information Services Enterprise. These needs represent everything from continuation and enhancement of in situ monitoring products such as USGS water gages and precipitation networks to supporting product maintenance and evolution to accommodate newly developed technologies.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan formore » the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.« less
Code of Federal Regulations, 2012 CFR
2012-07-01
... ASSISTANCE Financial Assistance for the National Estuary Program § 35.9065 Limitations. (a) Management... the estuary for which the work is proposed. (b) Elements of annual workplans. Annual Work Plans to be prepared by estuary Management Conferences must be reviewed by the Regional Administrator before final...
Code of Federal Regulations, 2010 CFR
2010-07-01
... ASSISTANCE Financial Assistance for the National Estuary Program § 35.9065 Limitations. (a) Management... the estuary for which the work is proposed. (b) Elements of annual workplans. Annual Work Plans to be prepared by estuary Management Conferences must be reviewed by the Regional Administrator before final...
Code of Federal Regulations, 2011 CFR
2011-07-01
... ASSISTANCE Financial Assistance for the National Estuary Program § 35.9065 Limitations. (a) Management... the estuary for which the work is proposed. (b) Elements of annual workplans. Annual Work Plans to be prepared by estuary Management Conferences must be reviewed by the Regional Administrator before final...
Code of Federal Regulations, 2013 CFR
2013-07-01
... ASSISTANCE Financial Assistance for the National Estuary Program § 35.9065 Limitations. (a) Management... the estuary for which the work is proposed. (b) Elements of annual workplans. Annual Work Plans to be prepared by estuary Management Conferences must be reviewed by the Regional Administrator before final...
Code of Federal Regulations, 2014 CFR
2014-07-01
... ASSISTANCE Financial Assistance for the National Estuary Program § 35.9065 Limitations. (a) Management... the estuary for which the work is proposed. (b) Elements of annual workplans. Annual Work Plans to be prepared by estuary Management Conferences must be reviewed by the Regional Administrator before final...
Learning from conservation planning for the U.S. National Wildlife Refuges.
Meretsky, Vicky J; Fischman, Robert L
2014-10-01
The U.S. National Wildlife Refuge System has nearly completed its first round of unit-level, comprehensive conservation plans (CCPs) and will soon begin required revisions. Laws and policies governing refuge planning emphasize ecological integrity, landscape-scale conservation, and adaptive management. We evaluated 185 CCPs completed during 2005-2011, which cover 324 of 555 national wildlife refuges. We reviewed CCP prescriptions addressing 5 common conservation issues (habitat and game, nongame, imperiled, and invasive species) and 3 specialized topics (landscape-scale conservation, climate change, and environmental quality). Common conservation issues received prescriptions in >90% of CCPs. Specialized topics received more variable treatment. Prescriptions for aquatic connectivity, water quantity, and climate-change impacts increased over the study period. Except for climate change, direct actions were the most common type of management prescription, followed by plans or studies. Most CCPs stated a commitment to adaptive management and prescribed monitoring for common conservation objectives; other aspects of planning for adaptive management were often lacking, despite strong support for adaptive management in the conservation planning literature. To better address refuge-specific threats, we recommend that revised plans explicitly match identified refuge issues with prescriptions, particularly for under-represented concerns such as novel pests and pathogens. We recommend incorporating triggers into monitoring frameworks and specifying actions that will occur when threshold values are reached to improve support for adaptive management. Revised CCPs should better reflect work that refuges already undertake to extend conservation objectives beyond their borders and better engage with regional conservation efforts to continue this work. More thorough landscape-scale threat assessments and explicit prioritization of planned actions would further improve conservation effectiveness. Excellent examples of all recommended practices exist within the CCPs we examined; sharing best planning practices would improve planning efficiency within the refuge system. © 2014 The Authors. Conservation Biology published by Wiley Periodicals, Inc., on behalf of the Society for Conservation Biology.
The Development of a Planning, Programming and Budgeting System. Technical Report.
ERIC Educational Resources Information Center
Appelquist, Claes-Goran; Zandren, S.
In CERI's program on institutional management in higher education, eight universities were brought together to set up teams within their institutions to work on their respective pre-selected problem areas. The planning, programming and budgeting system (PPBS) was developed as a management tool which would improve effectiveness by increasing the…
Modular space station phase B extension program master plan
NASA Technical Reports Server (NTRS)
Munsey, E. H.
1971-01-01
The project is defined for design, development, fabrication, test, and pre-mission and mission operations of a shuttle-launched modular space station. The project management approach is described in terms of organization, management requirements, work breakdown structure, schedule, time-phased logic, implementation plans, manpower, and funding. The programmatic and technical problems are identified.
A Model for Talent Management and Career Planning
ERIC Educational Resources Information Center
Waheed, Sajjad; Zaim, A. Halim
2015-01-01
This paper discusses a talent management and career planning system designed based on the performance and qualifications of a group of interns working for an emerging social media company located in Istanbul. The proposed model is dynamic, comparative, and perceptional in constructing a talent pool for an organization. This system was developed…
Collaborative planning to reduce risk
Victoria Sturtevant; Pamela Jakes
2008-01-01
Wildland fire knows no political boundaries, nor should efforts to address its risk. Collaboration is not a new idea; many examples of natural resource managers and community groups working together can be found in forest management planning, watershed restoration, and wildland fire suppression (Sturtevant et al. 2005). Direction from a number of sources has urged...
Workplace managers' view of the role of co-workers in return-to-work.
Dunstan, Debra A; MacEachen, Ellen
2016-11-01
Theoretical and empirical research findings attest to the workplace being a social environment in which co-workers have a critical influence on the employment outcomes and return-to-work (RTW) success of other employees. However, co-workers do not have a formal role in RTW planning. The aim of this study was to explore how managers responsible for developing and implementing RTW procedures view the role of co-workers in this process. An exploratory qualitative pilot study was conducted in Canada. Participants (1 male; 13 females; mean experience in RTW = 11.8 years) were workplace (n=8) or RTW managers (n=6) with direct oversight of RTW plans. The participants were recruited via invitation from a research institute and were drawn from three different provinces. Data were gathered via open-ended questions and were coded and subject to thematic analysis. Three key themes were identified: (1) Managers view RTW as having little relevance to co-workers but expect them to cooperate with the arrangements; (2) Formal procedures are inadequate when psychosocial barriers to work resumption are present, so managers use informal strategies to engage co-workers' emotional and social support; and (3) Managers have difficulty integrating RTW procedures with other legal obligations, such as privacy and confidentiality requirements. Existing arrangements for the development and implementation of RTW are sufficient most of the time, but may be inadequate when an injured worker presents with psychosocial barriers to work resumption. Implications for Rehabilitation Standard RTW arrangements can be inadequate when a RTW plan requires active co-worker support. Privacy and confidentiality provisions can result in managers using informal procedures for information exchange and to engage co-workers. The use of risk management strategies - assessment, consultation and communication - could be used to include co-workers when workplace issues threaten the success of a RTW plan.
ERIC Educational Resources Information Center
Kaiser, Harvey H.; Kirkwood, Dennis M.
2000-01-01
Presents a diagnostic model for assessing the state of an institution's capital programs management (CPM) by delineating "work processes" which comprise that function. What capital programs management is, its resources, and its phases and work processes are described, followed by case studies of the CPM Process Model as an assessment tool. (GR)
Public Managers Should Be Proactive
ERIC Educational Resources Information Center
Carlson, Thomas S.
1976-01-01
Future public managers should be proactive by creating management processes before problems arise. Planning prevents reactive or crisis managing. Future managers should also be prepared to meet dilemmas and paradoxes such as centralization versus decentralization of decision-making and work processes, politics versus administration dichotomy, and…
System integration test plan for HANDI 2000 business management system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilson, D.
This document presents the system integration test plan for the Commercial-Off-The-Shelf, PassPort and PeopleSoft software, and custom software created to work with the COTS products. The PP software is an integrated application for AP, Contract Management, Inventory Management, Purchasing and Material Safety Data Sheet. The PS software is an integrated application for Project Costing, General Ledger, Human Resources/Training, Payroll, and Base Benefits.
Schumacher, Lauren; Armaou, Maria; Rolf, Pauline; Sadhra, Steven; Sutton, Andrew John; Zarkar, Anjali; Grunfeld, Elizabeth A
2017-10-04
Returning to work after cancer is associated with improved physical and psychological functioning, but managing this return can be a challenging process. A workbook based intervention (WorkPlan) was developed to support return-to-work among cancer survivors. The aim of this study was to explore how participants using the workbook engaged with the intervention and utilised the content of the intervention in their plan to return-to-work. As part of a feasibility randomised controlled trial, 23 participants from the intervention group were interviewed 4-weeks post intervention. Interviews focussed on intervention delivery and data was analysed using Framework analysis. Participants revealed a sense of empowerment and changes in their outlook as they transitioned from patient to employee, citing the act of writing as a medium for creating their own return-to-work narrative. Participants found the generation of a return-to-work plan useful for identifying potential problems and solutions, which also served as a tool for aiding discussion with the employer on return-to-work. Additionally, participants reported feeling less uncertain and anxious about returning to work. Timing of the intervention in coordination with ongoing cancer treatments was crucial to perceived effectiveness; participants identified the sole or final treatment as the ideal time to receive the intervention. The self-guided workbook supports people diagnosed with cancer to build their communication and planning skills to successfully manage their return-to-work. Further research could examine how writing plays a role in this process. Current Controlled Trials ISRCTN56342476 . Retrospectively registered 14 October 2015.
Business plans--tips from the toolkit 6.
Steer, Neville
2010-07-01
General practice is a business. Most practices can stay afloat by having appointments, billing patients, managing the administration processes and working long hours. What distinguishes the high performance organisation from the average organisation is a business plan. This article examines how to create a simple business plan that can be applied to the general practice setting and is drawn from material contained in The Royal Australian College of General Practitioners' 'General practice management toolkit'.
An Archeological Overview and Management Plan for the Harry Diamond Laboratories, Adelphi, Maryland.
1985-07-01
WORK ON HARRY DIAMOND LABORATORY- ADELPHI, MARYLAND A number of prehistoric and historic sites have been reported in the vicinity of HDLA. Attempts...AD-Rftl 054 AN ARCHEOLOGICAL OVERVIEW AND NANAGENENT PLAN FOR THE Sui HARRY DIAMOND LABORATORIES ADELPHI NARYLRNDCU) U NLRSIFEDENYIROSPHERE CO NEW...An Archeological Overview and Management Plan r ifor the Harry Diamond Laboratories - Adelphi, Maryland Under Contract CX4000-3-0018 with the National
Tank waste remediation system multi-year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less
Tank waste remediation system multi-year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-09-01
The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less
Yorke, Janelle; Prigmore, Sam; Hodson, Matt; Stonham, Carol; Long, Hannah; Bellhouse, Sarah; Fletcher, Monica; Edwards, Sheila
2017-01-01
The National Health Service currently faces significant challenges and must optimise effective workforce planning and management. There are increasing concerns regarding poor workforce planning for respiratory medicine; a greater understanding of the role of respiratory nurse specialists will inform better workforce planning and management. This was a survey study. Two surveys were administered: an organisational-level survey and an individual respiratory nurse survey. There were 148 and 457 respondents to the organisational and individual nurse survey, respectively. Four main themes are presented: (1) breadth of service provided; (2) patient care; (3) work environment; and (4) succession planning. The majority of work conducted by respiratory nurse specialists relates to patient care outside the secondary care setting including supporting self-management in the home, supporting patients on home oxygen, providing hospital-at-home services and facilitating early discharge from acute care environments. Yet, most respiratory nursing teams are employed by secondary care trusts and located within acute environments. There was evidence of multidisciplinary working, although integrated care was not prominent in the free-text responses. High workload was reported with one-quarter of nursing teams short-staffed. Respiratory nurses reported working unpaid extra hours and a lack of administrative support that often took them away from providing direct patient care. Nearly half of the present sample either plan to retire or are eligible for retirement within 10 years. This survey report provides a current snapshot of the respiratory nurse specialist workforce in the UK. This workforce is an ageing population; the results from this survey can be used to inform succession planning and to ensure a viable respiratory nurse specialist workforce in future.
Yorke, Janelle; Prigmore, Sam; Hodson, Matt; Stonham, Carol; Long, Hannah; Bellhouse, Sarah; Fletcher, Monica; Edwards, Sheila
2017-01-01
Introduction The National Health Service currently faces significant challenges and must optimise effective workforce planning and management. There are increasing concerns regarding poor workforce planning for respiratory medicine; a greater understanding of the role of respiratory nurse specialists will inform better workforce planning and management. Methods This was a survey study. Two surveys were administered: an organisational-level survey and an individual respiratory nurse survey. Results There were 148 and 457 respondents to the organisational and individual nurse survey, respectively. Four main themes are presented: (1) breadth of service provided; (2) patient care; (3) work environment; and (4) succession planning. The majority of work conducted by respiratory nurse specialists relates to patient care outside the secondary care setting including supporting self-management in the home, supporting patients on home oxygen, providing hospital-at-home services and facilitating early discharge from acute care environments. Yet, most respiratory nursing teams are employed by secondary care trusts and located within acute environments. There was evidence of multidisciplinary working, although integrated care was not prominent in the free-text responses. High workload was reported with one-quarter of nursing teams short-staffed. Respiratory nurses reported working unpaid extra hours and a lack of administrative support that often took them away from providing direct patient care. Nearly half of the present sample either plan to retire or are eligible for retirement within 10 years. Conclusions This survey report provides a current snapshot of the respiratory nurse specialist workforce in the UK. This workforce is an ageing population; the results from this survey can be used to inform succession planning and to ensure a viable respiratory nurse specialist workforce in future. PMID:28912954
40 CFR 256.05 - Annual work program.
Code of Federal Regulations, 2012 CFR
2012-07-01
....05 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Purpose, General Requirements... implementation of the State plan. ...
An ergonomic approach to improve work conditions of older employees in social housing.
Biquand, Sylvain; Heddad, Nadia
2012-01-01
French companies are legally required to develop action plans to improve employment and work conditions for older workers ("plans seniors"). These plans contain measures oriented towards recruiting, career evolution, skills developme1nt, knowledge transmission and improvement of work conditions. A tool for assessing work situations experienced by council buildings caretakers ("gardiens") was used in such a plan on behalf of the main agency of council housing in Paris, and we developed. This assessment tool was developed after ergonomic work analysis on a sample of 36 older caretakers (age > 57 y.o). The technical inspectors in charge of technical interventions on buildings and managing caretakers were trained to use the assessment tool and apply it to all caretakers aged 50 and over.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-07-01
This work plan establishes the methods and requirements for performing a radiological survey at the David Witherspoon, Incorporated, Landfill-1630 Site, Knoxville, Tennessee (DWI 1630 Site) in accordance with requirements under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The radiological survey will identify the radiological contamination level of the equipment and debris stored at the DWI 1630 Site. The data generated from the survey activities will support the decisions for characterization of the equipment/debris and aid in subsequent disposition and waste handling. The survey activities to be performed under this work plan include an equipment radiological survey,more » a walkover survey, and an immunoassay testing for polychlorinated biphenyls (PCBs). This work plan includes a quality assurance (QA)/quality control (QC) project plan, a health and safety (H&S) plan, and a waste management plan.« less
40 CFR 256.05 - Annual work program.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 256.05 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Purpose, General Requirements... implementation of the State plan. ...
40 CFR 256.05 - Annual work program.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 256.05 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Purpose, General Requirements... implementation of the State plan. ...
Are nurses prepared for retirement?
Blakeley, Judith; Ribeiro, Violeta
2008-09-01
This study explored various factors and income sources that registered nurses believe are important in retirement planning. In many countries worldwide, many registered nurses are approaching retirement age. This raises concerns related to the level of preparedness of retiring nurses. A mail-out questionnaire was sent to 200 randomly selected nurses aged 45 and older. SPSS descriptors were used to outline the data. Multiple t-tests were conducted to test for significant differences between selected responses by staff nurses and a group of nurse managers, educators and researchers. Of 124 respondents, 71% planned to retire by age 60. Only 24% had done a large amount of planning. The top four planning strategies identified were related to keeping healthy and active, both physically and mentally; a major financial planning strategy ranked fifth. Work pensions, a government pension and a personal savings plan were ranked as the top three retirement income sources. No significant differences were found between the staff nurse and manager groups on any of the items. IMPLICATIONS FOR NURSING MANAGERS/CONCLUSIONS: The results of this study suggest that managers' preparation for retirement is no different from that of staff nurses. All nurses may need to focus more on financial preparation, and begin the process early in their careers if they are to have a comfortable and healthy retirement. Nurse managers are in a position to advocate with senior management for early and comprehensive pre-retirement education for all nurses and to promote educational sessions among their staff. Managers may find the content of this paper helpful as they work with nurses to help them better prepare for retirement. This exploratory study adds to the limited amount of research available on the topic.
Case Study -- Improving Management Performance
ERIC Educational Resources Information Center
Stait, Norman
1970-01-01
The Knitting, Lace, and Net Industry Training Board in Great Britain is beginning to work with management training, using three firms for experimental pilot projects. The Board plans to introduce this management system throughout the industry. (MF)
ERIC Educational Resources Information Center
Handy, Alice Evans; Yucht, Alice H.
1993-01-01
Includes two articles that discuss time management and mail management strategies for librarians. Highlights include identifying personal work styles; planning and prioritizing; using calendars and computers; reexamining traffic patterns; delegating; and sorting and handling mail. (Contains eight references.) (LRW)
NASA Astrophysics Data System (ADS)
1980-09-01
The energy emergency management information system (EEMIS) has responsibility for providing special information and communication services to government officials at Federal and state levels, who must deal with energy emergencies. Because of proprietary information residing in the data base used for federal purposes, a special system (EEMIS-S) must be established for use by the states. It is planned to acquire teleprocessing services for EEMIS-S from a time-sharing commercial vendor, and the process for procurement must meet guidelines for approval. The work plan and schedule for meeting these guidelines are discussed. Tasks to be included contain estimates of time, cost, and resources required, all of which are briefly described.
A Team Approach to Managing Technology: Despite Our Differences--We Had To Make IT Work!
ERIC Educational Resources Information Center
Giuliani, Peter R.
Franklin University, a private urban university with 4500 students located in Columbus, Ohio, completed the initial phase of a long-range, campus-wide technology plan. The plan creates a well supported and managed computing and communications infrastructure focusing on: user support systems; classrooms and laboratories; offices; outside access;…
Interdisciplinary collaboration within project-level NEPA teams in the US Forest Service
James W. Freeman; Marc J. Stern; Michael Mortimer; Dale J. Blahna; Lee K. Cerveny
2011-01-01
Interdisciplinary teamwork has become a foundation of natural resources planning and management in the US. Yet, we know little about the degree of interdisciplinary collaboration of natural resource planning teams. We conducted 10 case studies of Forest Service NEPA (National Environmental Policy Act) teams working on projects related to the 2005 Travel Management Rule...
McDonald, G; Weston, N; Dorrington, B
2003-01-01
This paper reports on work in progress on the new Wet Tropics Regional Natural Resource Management Plan and its potential to deliver river management and water quality outcomes. The plan is being prepared in accordance with the guidelines of the Nation Action Plan for Salinity and Water Quality/Natural Heritage Trust (NAP/NHT2). In particular the paper discusses the technical basis for priorities, target setting and implementation and the most effective instruments for achieving river improvement and water quality outcomes in the region.
Managing for Successful Control of Naturally Occurring Asbestos During Large Scale Grading
NASA Astrophysics Data System (ADS)
Saur, R.; Harnish, D.; Cavanaugh, J.; Kendall, K.; Virdee, A.; Ludlam, D.
2012-12-01
Pacific Gas and Electric Company recently completed environmental remediation and civil grading of a 35-acre site in San Francisco Bay Area, and the project became recognized with local agencies as having excellent controls systems for naturally-occurring asbestos (NOA). The project began in 2010 and was completed in 2012, and involved excavating and grading over 100,000 tons of soil containing NOA. The work was subject to requirements by state, local and regional agencies, including an asbestos dust mitigation plan for the Bay Area Air Quality Management District. Effective control of NOA is attributed to management approaches combined with effective monitoring and state-of-the-art controls. Management Planning. The contract for construction specified NOA compliance management and controls, including having a NOA-control "czar" ultimately responsible for effective mitigation. An important element was daily pre-planning for excavation/grading that involved both the NOA mitigation experts and construction staff. Personnel Planning and Training. All construction personnel were trained before work regarding NOA hazards and mitigations. Daily tailboards with all construction personnel included discussions of the NOA controls integral to the daily work. Supervision. A NOA mitigation compliance leader was assigned to each excavation operation, responsible for continuously monitoring wind direction and work to ensure mitigation met requirements, and that disturbed areas were hydrosealed or covered. Adaptive Management - Daily and weekly debriefs occurred with those responsible for NOA controls to evaluate effectiveness, and identify improvements needed. If a monitoring result exceeded the project trigger level, work shut down and a root-cause analysis was performed to determine appropriate corrective actions. Deviations of results from background were researched as to cause, and any adjustments identified. Nearby non-project activities were monitored, as they occasionally caused trigger level exceedences in perimeter monitors, including from off-site vehicles, nearby construction, and mechanical vegetation management (e.g. weed whacking). Regulatory and Owner Oversight. Monitoring results were reported daily to agencies, agencies made frequent inspections, and owner's independent compliance representatives observed the NOA mitigation and provided real-time feedback to the construction team. NOA Controls. NOA emissions were controlled site-wide and for each work activity. Site systems included misting, water trucks on roads, temporary covers and soil sealants. Work activity controls for excavation/grading included both source and perimeter controls. Water application technologies specially designed for NOA fiber mitigation, and not just dust mitigation, were effective without adding excessive water to work areas. These activities collectively created a management structure that facilitated successful implementation of NOA control technologies.
Job sharing in clinical nutrition management: a plan for successful implementation.
Visocan, B J; Herold, L S; Mulcahy, M J; Schlosser, M F
1993-10-01
While women continue to enter the American work force in record numbers; many experience difficulty in juggling career and family obligations. Flexible scheduling is one option used to ease work and family pressures. Women's changing work roles have potentially noteworthy implications for clinical nutrition management, a traditionally female-dominated profession where the recruitment and retention of valued, experienced registered dietitians can prove to be a human resources challenge. Job sharing, one type of flexible scheduling, is applicable to the nutrition management arena. This article describes and offers a plan for overcoming obstacles to job sharing, including determining feasibility, gaining support of top management, establishing program design, announcing the job share program, and using implementation, monitoring, and fine-tuning strategies. Benefits that can be derived from a successful job share are reduced absenteeism, decreased turnover, enhanced recruitment, improved morale, increased productivity, improved job coverage, and enhanced skills and knowledge base. A case study illustrates one method for achieving job sharing success in clinical nutrition management.
Repository-Based Software Engineering Program: Working Program Management Plan
NASA Technical Reports Server (NTRS)
1993-01-01
Repository-Based Software Engineering Program (RBSE) is a National Aeronautics and Space Administration (NASA) sponsored program dedicated to introducing and supporting common, effective approaches to software engineering practices. The process of conceiving, designing, building, and maintaining software systems by using existing software assets that are stored in a specialized operational reuse library or repository, accessible to system designers, is the foundation of the program. In addition to operating a software repository, RBSE promotes (1) software engineering technology transfer, (2) academic and instructional support of reuse programs, (3) the use of common software engineering standards and practices, (4) software reuse technology research, and (5) interoperability between reuse libraries. This Program Management Plan (PMP) is intended to communicate program goals and objectives, describe major work areas, and define a management report and control process. This process will assist the Program Manager, University of Houston at Clear Lake (UHCL) in tracking work progress and describing major program activities to NASA management. The goal of this PMP is to make managing the RBSE program a relatively easy process that improves the work of all team members. The PMP describes work areas addressed and work efforts being accomplished by the program; however, it is not intended as a complete description of the program. Its focus is on providing management tools and management processes for monitoring, evaluating, and administering the program; and it includes schedules for charting milestones and deliveries of program products. The PMP was developed by soliciting and obtaining guidance from appropriate program participants, analyzing program management guidance, and reviewing related program management documents.
The components of action planning and their associations with behavior and health outcomes.
Lorig, Kate; Laurent, Diana D; Plant, Kathryn; Krishnan, Eswar; Ritter, Philip L
2014-03-01
Based on the works of Kiesler and Bandura, action plans have become important tools in patient self-management programs. One such program, shown effective in randomized trials, is the Internet Chronic Disease Self-Management Program. An implementation of this program, Healthy Living Canada, included detailed information on action plans and health-related outcome measures. Action plans were coded by type, and associations between action plans, confidence in completion and completion were examined. Numbers of Action Plans attempted and competed and completion rates were calculated for participants and compared to six-month changes in outcomes using regression models. Five of seven outcome measures significantly improved at six-months. A total of 1136 action plans were posted by 254 participants in 12 workshops (mean 3.9 out of 5 possible); 59% of action plans involved exercise, 16% food, and 14% role management. Confidence of completion was associated with completion. Action plan completion measures were associated with improvements in activity limitation, aerobic exercise, and self-efficacy. Baseline self-efficacy was associated with at least partial completion of action plans. Action planning appears to be an important component of self-management interventions, with successful completion associated with improved health and self-efficacy outcomes.
ERIC Educational Resources Information Center
Spencer, Richard L.; And Others
Within this document, and presented in their entirety, are five reports which depict differing views of Delaware County Community College (DCCC) from 1974 through 1980. The reports consist of both historical and predictive data, evolved from staff work related to long and short range planning. The general framework for this activity revolved about…
Time management for today's workplace demands.
Thomack, Bill
2012-05-01
As the work force decreases, the workload remains the same or, in many cases, increases. An effective employee must arrange work time to accomplish what needs to be done in the time available. The best way to manage time is to set a goal, develop a plan, and measure the outcome. To manage time requires determining where time is currently spent, taking time at the end of the day to prepare for the next morning, managing appointments, carefully planning projects, and managing phone, electronic, and paper mail. Organization is another step in effectively managing time. An organizational system decreases wasted time. Keeping the desk clear and creating a system to organize mail improves efficiency. Time management also focuses on balance, an overall purpose, and supporting principles. Personal or professional effectiveness does not depend solely on the effort expended, but whether the effort is in the right direction. The challenge of time management is to manage not only time, but also oneself. Copyright 2012, SLACK Incorporated.
Larsson, Lena Gunvor; Bäck-Pettersson, Siv; Kylén, Sven; Marklund, Bertil; Carlström, Eric
2017-01-01
The aim of this study was to investigate primary care managers' perceptions of their capability in providing care planning to patients with complex needs. Care planning is defined as a process where the patient, family and health professionals engage in dialogue about the patient's care needs and plan care interventions together. Semi-structured interviews with 18 primary care managers in western Sweden were conducted using Westrin's theoretical cooperation model. Data were analysed using a qualitative deductive method. Results reveal that the managers' approach to care planning was dominated by non-cooperation and separation. The managers were permeated by uncertainty about the meaning of the task of care planning as such. They did not seem to be familiar with the national legislation stipulating that every healthcare provider must meet patients' need for care interventions and participate in the care planning. To accomplish care planning, the process needs to cross - and overcome - both professional and organisational boundaries. There is also a need for incentives to develop working methods that promote local cooperation in order to facilitate optimal care for patients with complex needs. Copyright © 2016. Published by Elsevier Ireland Ltd.
Transition and closeout of the Fernald Closure Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bilson, H.E.; Terry, T.; Reising, J.
The U.S. Department of Energy (DOE) and Fluor Fernald have completed the majority of the cleanup of the Fernald Site. The over 1,000 acre complex for processing uranium has been demolished and soil contamination has been remediated. With acres of wetlands and prairies replacing the buildings and waste pits. At the end of the project the focus shifted to developing demonstrating the completion of the project and the contract, as well as ensuring a smooth transition of the facility from the DOE's Environmental Management (EM) Program to the DOE's Legacy Management (LM) Program. Working with the DOE, each portion ofmore » the closure contract was examined for specific closure definition. From this negotiation effort the Comprehensive Exit and Transition Plan (CE/T Plan) was written. The CE/T Plan is intended to assist DOE in the analysis that the site is ready for transfer into long-term stewardship (LTS) (also referred to as legacy management) and that Fluor Fernald, Inc. has satisfactorily completed the closure contract statement of work elements. Following the Lessons Learned from the closure of the Rocky Flats Site, the DOE's Legacy Management Program created a matrix of Transition Elements required to ensure adequate information was in place to allow the new prime contractor to perform the Legacy Management scope of work. The transition plan included over 1,000 elements broken down into functional areas and relied on specific Fernald Responsibility Transition Packages (RTPs) for detailed transition actions. The template for Closure and Transition Planning used at the Fernald Site was developed using the best Lessons Learned from across the DOE Complex. The template could be used for other sites, and lessons learned from this closure and transition will be appropriate for all closure projects. (authors)« less
Cultural Changes: Their Influence on Organizational Structure and Management Behavior
ERIC Educational Resources Information Center
Hersey, Paul; Blanchard, Kenneth H.
1970-01-01
The increase in level of maturity and responsibility of much of the work force has an impact on traditional principles of management and the role of the manager in planning, organizing, motivating, and controlling. (PT)
Mays, G. P.; Halverson, P. K.; Stevens, R.
2001-01-01
OBJECTIVE: The authors examine the extent and nature of managed care plans participating in local public health activities. METHODS: In 1998, the authors surveyed the directors of all US local health departments serving jurisdictions of at least 100,000 residents to collect information about public health activities performed in their jurisdictions and about organizations participating in the activities. Multivariate logistic and linear regression models were used to examine organizational and market characteristics associated with managed care plan participation in public health activities. RESULTS: Managed care plans were reported to participate in public health activities in 164 (46%) of the jurisdictions surveyed, and to contribute to 13% of the public health activities performed in the average jurisdiction. Plans appeared most likely to participate in public health activities involving the delivery or management of personal health services and the exchange of health-related information. Managed care participation was more likely to occur in jurisdictions with higher HMO penetration, fewer competing plans, and larger proportions of plans enrolling Medicaid recipients. Participation was positively associated with the overall scope and perceived effectiveness of local public health activities. CONCLUSIONS: Although plans participate in a narrow range of activities, these contributions may complement the work of public health agencies. PMID:11889275
Management and leadership by nurses.
Henry, B; Lorensen, M; Hirschfeld, M J
1994-01-01
Good management and leadership by nurses is essential for the achievement of health for all. Well-prepared nurses are required locally and nationally who can identify problems and needs, work on interdisciplinary teams to formulate development plans for human resources, improve working conditions, and raise the quality of care at reasonable cost.
Performance Analysis: Work Control Events Identified January - August 2010
DOE Office of Scientific and Technical Information (OSTI.GOV)
De Grange, C E; Freeman, J W; Kerr, C E
2011-01-14
This performance analysis evaluated 24 events that occurred at LLNL from January through August 2010. The analysis identified areas of potential work control process and/or implementation weaknesses and several common underlying causes. Human performance improvement and safety culture factors were part of the causal analysis of each event and were analyzed. The collective significance of all events in 2010, as measured by the occurrence reporting significance category and by the proportion of events that have been reported to the DOE ORPS under the ''management concerns'' reporting criteria, does not appear to have increased in 2010. The frequency of reporting inmore » each of the significance categories has not changed in 2010 compared to the previous four years. There is no change indicating a trend in the significance category and there has been no increase in the proportion of occurrences reported in the higher significance category. Also, the frequency of events, 42 events reported through August 2010, is not greater than in previous years and is below the average of 63 occurrences per year at LLNL since 2006. Over the previous four years, an average of 43% of the LLNL's reported occurrences have been reported as either ''management concerns'' or ''near misses.'' In 2010, 29% of the occurrences have been reported as ''management concerns'' or ''near misses.'' This rate indicates that LLNL is now reporting fewer ''management concern'' and ''near miss'' occurrences compared to the previous four years. From 2008 to the present, LLNL senior management has undertaken a series of initiatives to strengthen the work planning and control system with the primary objective to improve worker safety. In 2008, the LLNL Deputy Director established the Work Control Integrated Project Team to develop the core requirements and graded elements of an institutional work planning and control system. By the end of that year this system was documented and implementation had begun. In 2009, training of the workforce began and as of the time of this report more than 50% of authorized Integration Work Sheets (IWS) use the activity-based planning process. In 2010, LSO independently reviewed the work planning and control process and confirmed to the Laboratory that the Integrated Safety Management (ISM) System was implemented. LLNL conducted a cross-directorate management self-assessment of work planning and control and is developing actions to respond to the issues identified. Ongoing efforts to strengthen the work planning and control process and to improve the quality of LLNL work packages are in progress: completion of remaining actions in response to the 2009 DOE Office of Health, Safety, and Security (HSS) evaluation of LLNL's ISM System; scheduling more than 14 work planning and control self-assessments in FY11; continuing to align subcontractor work control with the Institutional work planning and control system; and continuing to maintain the electronic IWS application. The 24 events included in this analysis were caused by errors in the first four of the five ISMS functions. The most frequent cause was errors in analyzing the hazards (Function 2). The second most frequent cause was errors occurring when defining the work (Function 1), followed by errors during the performance of work (Function 4). Interestingly, very few errors in developing controls (Function 3) resulted in events. This leads one to conclude that if improvements are made to defining the scope of work and analyzing the potential hazards, LLNL may reduce the frequency or severity of events. Analysis of the 24 events resulted in the identification of ten common causes. Some events had multiple causes, resulting in the mention of 39 causes being identified for the 24 events. The most frequent cause was workers, supervisors, or experts believing they understood the work and the hazards but their understanding was incomplete. The second most frequent cause was unclear, incomplete or confusing documents directing the work. Together, these two causes were mentioned 17 times and contributed to 13 of the events. All of the events with the cause of ''workers, supervisors, or experts believing they understood the work and the hazards but their understanding was incomplete'' had this error in the first two ISMS functions: define the work and analyze the hazard. This means that these causes result in the scope of work being ill-defined or the hazard(s) improperly analyzed. Incomplete implementation of these functional steps leads to the hazards not being controlled. The causes are then manifested in events when the work is conducted. The process to operate safely relies on accurately defining the scope of work. This review has identified a number of examples of latent organizational weakness in the execution of work control processes.« less
EPA OIG Strategic Plan for 2012 - 2016
We plan our work with the goals of influencing resolution of the EPA’s major management challenges, reducing risk, improving program operations, and saving taxpayer dollars, leading to positive human health and environmental impacts.
Defense Commissary Resale Stock Fund Financial Statements For FY 1992
1993-06-30
present DeCA’s accounting procedures during FY 1992. We understand DeCA is aggressively working to improve its financial management system. However...the year ended September 30, 1992, we considered the related internal control structure. The purpose of the planning work was to determine the...auditing procedures we would apply for the purposes of expressing our opinion on the Financial Statements. Planning work included obtaining an
Managemant of NASA's major projects
NASA Technical Reports Server (NTRS)
James, L. B.
1973-01-01
Approaches used to manage major projects are studied and the existing documents on NASA management are reviewed. The work consists of: (1) the project manager's role, (2) request for proposal, (3) project plan, (4) management information system, (5) project organizational thinking, (6) management disciplines, (7) important decisions, and (8) low cost approach.
Adoption of Building Information Modelling in project planning risk management
NASA Astrophysics Data System (ADS)
Mering, M. M.; Aminudin, E.; Chai, C. S.; Zakaria, R.; Tan, C. S.; Lee, Y. Y.; Redzuan, A. A.
2017-11-01
An efficient and effective risk management required a systematic and proper methodology besides knowledge and experience. However, if the risk management is not discussed from the starting of the project, this duty is notably complicated and no longer efficient. This paper presents the adoption of Building Information Modelling (BIM) in project planning risk management. The objectives is to identify the traditional risk management practices and its function, besides, determine the best function of BIM in risk management and investigating the efficiency of adopting BIM-based risk management during the project planning phase. In order to obtain data, a quantitative approach is adopted in this research. Based on data analysis, the lack of compliance with project requirements and failure to recognise risk and develop responses to opportunity are the risks occurred when traditional risk management is implemented. When using BIM in project planning, it works as the tracking of cost control and cash flow give impact on the project cycle to be completed on time. 5D cost estimation or cash flow modeling benefit risk management in planning, controlling and managing budget and cost reasonably. There were two factors that mostly benefit a BIM-based technology which were formwork plan with integrated fall plan and design for safety model check. By adopting risk management, potential risks linked with a project and acknowledging to those risks can be identified to reduce them to an acceptable extent. This means recognizing potential risks and avoiding threat by reducing their negative effects. The BIM-based risk management can enhance the planning process of construction projects. It benefits the construction players in various aspects. It is important to know the application of BIM-based risk management as it can be a lesson learnt to others to implement BIM and increase the quality of the project.
Site support program plan for ICF Kaiser Hanford Company
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dieterle, S.E.
1996-09-27
The Fiscal Year (FY) 1997 Inftastructure Program Site Support Program Plan (SSPP) addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition.
FY 1986 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less
, Arielle worked in the hospitality sector, developing her customer service and business management skills . Arielle is responsible for overseeing and coordinating the planning, management, execution, and reporting
OSFA Goals and Objectives System: Strategies for Improved Program Planning and Management.
ERIC Educational Resources Information Center
Advanced Technology, Inc., Reston, VA.
The purpose and function of the Goals and Objectives System of the U.S. Office of Student Financial Assistance (OSFA) are discussed. Results of a review of the system, policy issues, and a strategy for improving the system in OSFA program planning and management are also addressed. The system identifies a structure for work activities in OSFA and…
Managing multihazards risk in metropolitan USA
NASA Astrophysics Data System (ADS)
Aktan, A. Emin; Comfort, Louise K.; Shanis, Donald S.
2003-07-01
This proposal outlines an action plan for risk management in the Delaware Valley Metropolitan Region. This plan is consistent with the goals for strengthening homeland security announced by President Bush, and is designed to complement efforts currently under development by Pennsylvania Emergency Management Agency and Department of Health. This plan proposes the formation of a Delaware Valley Risk Management Consortium, representing the critical disciplines and organizations related to risk assessment and management. This group would have membership from academic institutions, government agencies, industry, and nonprofit organizations. This Consortium would develop a systemic scope of work with the appropriate recommendations for technology acquisition, development and integration with risk management policies and procedures. This scope of work would include the development of two related information systems for the Delaware Valley Region. The first would be a comprehensive 'health monitoring' system to assess the continuity of operations, which would use integrated remote sensing and imaging, information gathering, communication, computation, and, information processing and management over wide-area networks covering the entire metropolitan area. The second would use real-time information from the health monitoring system to support interactive communication, search and information exchange needed to coordinate action among the relevant agencies to mitigate risk, respond to hazards and manage its resources efficiently and effectively.
Eastern Washington Intermodal Transportation Study Scope of Work
DOT National Transportation Integrated Search
1993-02-04
This document presents a detailed Scope of Work to guide implementation of : the Eastern Washington Intermodal Transportation Study. Included is a : description of project management and staff responsibilities, a detailed work : plan and timetable fo...
Working at the Ohio Aerospace Institute
NASA Technical Reports Server (NTRS)
Szabo, Hortenzia
2004-01-01
The Ohio Aerospace Institute is a wonderful place to work. I enjoy coming to work everyday knowing that I will be surrounded by smiling faces. My mentor, Mary Auzenne, is the Program Manager of the LERCIP College Internship Program, however, I spend most of my time working with Akua Soadwa, the Assistant Program Manager. She is in charge of planning, coordinating, and managing every event that is involved with the college internship program such as the socials, picnic, banquet, workshops, and research symposium. My job is to make her job easier. I help out with the planning, coordinating, and managing of these events. When I first got on board Akua was in the process of planning the second social for the interns. The social is a way for the interns to interact with one another as well as to find out more about where the other interns are working at NASA. We ordered the food, went shopping, and set up the Guerin House for the party. I made sign-in sheets, which helped us get a rough count of the attendees. The next event was the Technical Presentation Workshop and the Professional Development Workshop. These workshops are designed to enhance skills of the interns. We were there to sign people in and direct them to the room where the presentation was to take place. I also took pictures of the workshop and provided copies for the presenters, as well as our files.
Blickem, Christian; Kennedy, Anne; Jariwala, Praksha; Morris, Rebecca; Bowen, Robert; Vassilev, Ivaylo; Brooks, Helen; Blakeman, Tom; Rogers, Anne
2014-06-17
Recent initiatives to target the personal, social and clinical needs of people with long-term health conditions have had limited impact within primary care. Evidence of the importance of social networks to support people with long-term conditions points to the need for self-management approaches which align personal circumstances with valued activities. The Patient-Led Assessment for Network Support (PLANS) intervention is a needs-led assessment for patients to prioritise their health and social needs and provide access to local community services and activities. Exploring the work and practices of patients and telephone workers are important for understanding and evaluating the workability and implementation of new interventions. Qualitative methods (interviews, focus group, observations) were used to explore the experience of PLANS from the perspectives of participants and the telephone support workers who delivered it (as part of an RCT) and the reasons why the intervention worked or not. Normalisation Process Theory (NPT) was used as a sensitising tool to evaluate: the relevance of PLANS to patients (coherence); the processes of engagement (cognitive participation); the work done for PLANS to happen (collective action); the perceived benefits and costs of PLANS (reflexive monitoring). 20 patients in the intervention arm of a clinical trial were interviewed and their telephone support calls were recorded and a focus group with 3 telephone support workers was conducted. Analysis of the interviews, support calls and focus group identified three themes in relation to the delivery and experience of PLANS. These are: formulation of 'health' in the context of everyday life; trajectories and tipping points: disrupting everyday routines; precarious trust in networks. The relevance of these themes are considered using NPT constructs in terms of the work that is entailed in engaging with PLANS, taking action, and who is implicated this process. PLANS gives scope to align long-term condition management to everyday life priorities and valued aspects of life. This approach can improve engagement with health-relevant practices by situating them within everyday contexts. This has potential to increase utilisation of local resources with potential cost-saving benefits for the NHS. ISRCTN45433299.
Making Strategic Planning Work: Experiences from a Private University. AIR 1986 Annual Forum Paper.
ERIC Educational Resources Information Center
Chan, Susy S.
Issues in implementating strategic planning in higher education management are considered, along with successful strategies and problem areas in implementing an integrated planning and budgeting process at DePaul University, a comprehensive Catholic university. Key implementation issues are as follows: (1) maintaining an organizational balance…
The paper discusses the Environmental Protection Agency's (EPA) Air and Energy Engineering Research Laboratory (AEERL) research plan for work in the global climate area. The plan, written for discussion with senior scientists and program managers at EPA's Global Climate Change Re...
24 CFR 968.315 - Comprehensive Plan (including five-year action plan).
Code of Federal Regulations, 2011 CFR
2011-04-01
... comprehensive plan including, but not limited to, the physical and management needs assessments, viability...) Physical needs assessment—(i) Requirements. The physical needs assessment identifies all of the work that a... physical needs assessment is completed without regard to the availability of funds, and shall include the...
24 CFR 968.315 - Comprehensive Plan (including five-year action plan).
Code of Federal Regulations, 2012 CFR
2012-04-01
... comprehensive plan including, but not limited to, the physical and management needs assessments, viability...) Physical needs assessment—(i) Requirements. The physical needs assessment identifies all of the work that a... physical needs assessment is completed without regard to the availability of funds, and shall include the...
24 CFR 968.315 - Comprehensive Plan (including five-year action plan).
Code of Federal Regulations, 2013 CFR
2013-04-01
... comprehensive plan including, but not limited to, the physical and management needs assessments, viability...) Physical needs assessment—(i) Requirements. The physical needs assessment identifies all of the work that a... physical needs assessment is completed without regard to the availability of funds, and shall include the...
Psychological predictors of cultural diversity support at work.
Hiemstra, Annemarie M F; Derous, Eva; Born, Marise Ph
2017-07-01
As diversity management activities become more prominent worldwide it is important to understand psychological reactions to them to ensure success, but empirical evidence is lacking. This study investigated employees' and managers' intentions and behavior to promote cultural diversity at work in a variety of organizations in the Netherlands, using Ajzen's theory of planned behavior. Predictors of intentions to promote cultural diversity at work (N = 670) and actual behavior after 6 months were assessed among managers and employees using self-reports in a 2-wave survey design. Participants' average age at Time 1 was 38.26 years (SD = 11.86), 56% was female, and there were 78.1% Dutch ethnic majority and 21.9% ethnic minority participants. Attitude to cultural diversity promotion at work and perceived behavioral control (PBC) related positively to both individuals' intentions to promote cultural diversity at work, which in turn predicted behavior. The strongest driver, however, was attitude. Managers' reported PBC and behavior were higher compared to employees. This study supported the applicability of the theory of planned behavior to predict intentions and behavior to promote cultural diversity at work. With an increasingly diverse workforce, this study aimed to advance our understanding of drivers of individual reactions and behavior to support cultural diversity at work. (PsycINFO Database Record (c) 2017 APA, all rights reserved).
Waste Encapsulation and Storage Facility (WESF) Dangerous Waste Training Plan (DWTP)
DOE Office of Scientific and Technical Information (OSTI.GOV)
SIMMONS, F.M.
2000-03-29
This Waste Encapsulation Storage Facility (WESF) Dangerous Waste Training Plan (DWTP) applies to personnel who perform work at, or in support of WESF. The plan, along with the names of personnel, may be given to a regulatory agency inspector upon request. General workers, subcontractors, or visiting personnel who have not been trained in the management of dangerous wastes must be accompanied by an individual who meets the requirements of this training plan. Dangerous waste management includes handling, treatment, storage, and/or disposal of dangerous and/or mixed waste. Dangerous waste management units covered by this plan include: less-than-90-day accumulation area(s); pool cellsmore » 1-8 and 12 storage units; and process cells A-G storage units. This training plan describes general requirements, worker categories, and provides course descriptions for operation of the WESF permitted miscellaneous storage units and the Less-than-90-Day Accumulation Areas.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Saw, Cheng B., E-mail: cheng.saw@aol.com; Battin, Frank; McKeague, Janice
2016-01-01
Dose or treatment planning management is necessary for the re-irradiation of intracranial relapses after focal irradiation, radiosurgery, or stereotactic radiotherapy. The current clinical guidelines for metastatic brain tumors are the use of focal irradiation if the patient presents with 4 lesions or less. Salvage treatments with the use of whole brain radiation therapy (WBRT) can then be used to limit disease progression if there is an intracranial relapse. However, salvage WBRT poses a number of challenges in dose planning to limit disease progression and preserve neurocognitive function. This work presents the dose planning management that addresses a method of delineatingmore » previously treated volumes, dose level matching, and the dose delivery techniques for WBRT.« less
Code of Federal Regulations, 2010 CFR
2010-01-01
..., water quality management, ground water supply, agricultural pollution control, and other water management. (d) After a final plan for works of improvement is agreed upon between NRCS and the sponsors and... proper utilization of land, flood prevention, agricultural water management including irrigation and...
Site-Based Management: Crisis or Opportunity?
ERIC Educational Resources Information Center
Lausberg, Clement H.
1990-01-01
If appropriate planning occurs, business officials can support site-based management. Districts need to develop new working relationships that appropriately balance the responsibility of the business office for district finances and support services with more site-based management at the school level. (MLF)
Generation of Conflict Resolution Maneuvers for Air Traffic Management
DOT National Transportation Integrated Search
1997-01-01
We explore the use of distributed on-line motion planning algorithms for multiple mobile agents, in Air Traffic Management Systems (ATMS). The work is motivated by current trends in ATMS to move towards decentralized air traffic management, in which ...
Davidson, Anne; McKerrow, Alexa; Long, Don; Earnhardt, Todd
2015-01-01
The intended target audience for this document initially is management and project technical specialist and scientists involved in the Gap Analysis Program (GAP) and the Landscape Fire and Resource Management Planning Tools - (LANDFIRE) program to help communicate coordination activities to all involved parties. This document is also intended to give background information in other parts of the USGS and beyond, although some details given are relatively oriented to management of the respective programs. Because the Gap Analysis Program (GAP) and the Landscape Fire and Resource Management Planning Tools - LANDFIRE programs both rely on characterizations of land cover using similar scales and resolutions, the programs have been coordinating their work to improve scientific consistency and efficiency of production. Initial discussions and informal sharing of ideas and work began in 2008. Although this collaboration was fruitful, there was no formal process for reporting results, plans, or outstanding issues, nor was there any formally-defined coordinated management team that spanned the two programs. In 2012, leadership from the two programs agreed to strengthen the coordination of their respective work efforts. In 2013 the GAP and LANDFIRE programs developed an umbrella plan of objectives and components related to three mutual focus areas for the GAP and LANDFIRE collaboration for the years 2013 and 2014 (GAP/LANDFIRE 2013). The evolution of this partnership resulted in the drafting of an inter-program Memorandum of Understanding (MOU) in 2014. This MOU identified three coordination topics relevant to the two programs participating at this point in the MOU history: Vegetation mappingDisturbance classesFormal quality assessment
NASA Astrophysics Data System (ADS)
White, E.; Peterson, T. J.; Costelloe, J. F.; Western, A. W.; Carrara, E.
2017-12-01
Regulation of groundwater through the use of management plans is becoming increasingly prevalent as global groundwater levels decline. But plans are seldom systematically and quantitatively assessed for effectiveness. Instead, the state of an aquifer is commonly considered a proxy for plan effectiveness despite a lack of casaulity. Groundwater managers face myraid challenges such as finite resources, conflicting uses and the uncertainty inherent in any groundwater investigation. Groundwater models have been used to provide insights into what may happen to the aquifer under various levels of stress. Generally, these models simulate the impact of predefined stresses for a certain time-span. However, this is not how management occurs in reality. Managers only see a fraction of the aquifer and use this limited knowledgeto make aquifer-wide decisions. Also, management changes over time in response to aquifer state, and groundwater management plans commonly contain trigger levels in monitoring wells that prompt management intervention. In this way there is a feedback between the aquifer state and management that is rarely captured by groundwater management models. To capture this management/aquifer feedback, groundwater management was structured as a systems control problem, and using this framework, a testability assessment rubric developed. The rubric was applied to 15 Australian groundwater management plans and 47% of plans were found to be testable. To numerically quantify the effectiveness of groundwater managment, the impact of extraction restrictions was probabilistically assessed by simulating "the act of management" of a simple unconfined groundwater system using MODFLOW and Flopy. Water managers were privy only to head levels in a varying number of grid cells assigned as monitoring wells, and used that limited information to make allocation decisions at each time step. Extraction rates for each simulated management period were determined based upon the observed heads from the previous management period and adjusted depending upon triggers outlined in the management plan. The effectiveness of water restrictions as a management technique for the purpose of maintaining supply reliability under various decision making frequencies, aquifer response times and climate scenarios was explored.
Introduction of the UNIX International Performance Management Work Group
NASA Technical Reports Server (NTRS)
Newman, Henry
1993-01-01
In this paper we presented the planned direction of the UNIX International Performance Management Work Group. This group consists of concerned system developers and users who have organized to synthesize recommendations for standard UNIX performance management subsystem interfaces and architectures. The purpose of these recommendations is to provide a core set of performance management functions and these functions can be used to build tools by hardware system developers, vertical application software developers, and performance application software developers.
Johnston, Venerina; Jull, Gwendolen; Sheppard, Dianne M; Ellis, Niki
2013-08-01
It is incumbent on health care professionals to support patients with chronic musculoskeletal conditions to manage the impact of the condition on their life. Work is a positive health behaviour for which self-management skills are essential. In this paper, self-management is defined and the role of clinicians in promoting self-management for return to work is outlined with examples and tips on how the clinician can incorporate self-management into practice. The clinician is ideally placed to assist individuals with chronic musculoskeletal conditions manage to remain at work or return to work. This can be achieved through such activities as the promotion of the core self-management skills of problem-solving, decision making, resource utilisation, developing a cooperative partnership between clinician and patient and making an action plan. Copyright © 2013 Elsevier Ltd. All rights reserved.
Reilly pulls it together with care
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kiesche, E.S.
1992-12-09
Reilly Industries (Indianapolis) has changed strategic planning procedures to incorporate Responsible Care into its business plans. Each of the company's business units budgets for Responsible Care and reports quarterly on progress in implementing the codes, says Jacqueline Fernette, corporate communications coordinator and Responsible Care coordinator. The company's goal is to achieve full implementation by the end of 1997. In Reilly's 1993 budget, 20% of capital is directed at Responsible Care, says president Robert McNeeley. We hold unit managers responsible for planning Responsible Care within their businesses and reporting on them on a quarterly basis, says McNeeley. The firm makes pyridine,more » coal tar, potash and related chemicals, and specialized esters, and posts annual in the $250 million-$300 million range. Reilly has seven plants and 900 employees. Incorporating Responsible Care into the strategic business plan required a fair amount of administrative work to make sure that all business unit managers understood the concepts and were working in comparable terms, says McNeeley. We needed to bring the managers up to speed in six codes, so there was a training aspect to it.« less
Rocky Mountain Research Station USDA Forest Service
2004-01-01
In the course of work as a land manager, you will no doubt be involved in developing programs to achieve various objectives, including the improvement of fuels management on private lands. This fact sheet describes six steps that will help you plan and conduct a successful program.
Training Packages: The Scientific Management of Education.
ERIC Educational Resources Information Center
Hunter, John
The theory of scientific management was established as a way to increase workers' productivity. The following are among the key principles underpinning scientific management: task simplification and division of labor boost productivity; management must control the planning of work down to its minutiae; and remuneration should be based on output.…
Bhui, Kamaldeep; Dinos, Sokratis; Galant-Miecznikowska, Magdalena; de Jongh, Bertine; Stansfeld, Stephen
2016-01-01
Aims and method To identify causes of stress at work as well as individual, organisational and personal interventions used by employees to manage stress in public, private and non-governmental organizations (NGOs). Qualitative interviews were conducted with 51 employees from a range of organisations. Results Participants reported adverse working conditions and management practices as common causes of work stress. Stress-inducing management practices included unrealistic demands, lack of support, unfair treatment, low decision latitude, lack of appreciation, effort–reward imbalance, conflicting roles, lack of transparency and poor communication. Organisational interventions were perceived as effective if they improved management styles, and included physical exercise, taking breaks and ensuring adequate time for planning work tasks. Personal interventions used outside of work were important to prevent and remedy stress. Clinical implications Interventions should improve management practices as well as promoting personal interventions outside of the work setting. PMID:28377811
An Internationally Coordinated Science Management Plan for Samples Returned from Mars
NASA Astrophysics Data System (ADS)
Haltigin, T.; Smith, C. L.
2015-12-01
Mars Sample Return (MSR) remains a high priority of the planetary exploration community. Such an effort will undoubtedly be too large for any individual agency to conduct itself, and thus will require extensive global cooperation. To help prepare for an eventual MSR campaign, the International Mars Exploration Working Group (IMEWG) chartered the international Mars Architecture for the Return of Samples (iMARS) Phase II working group in 2014, consisting of representatives from 17 countries and agencies. The overarching task of the team was to provide recommendations for progressing towards campaign implementation, including a proposed science management plan. Building upon the iMARS Phase I (2008) outcomes, the Phase II team proposed the development of an International MSR Science Institute as part of the campaign governance, centering its deliberations around four themes: Organization: including an organizational structure for the Institute that outlines roles and responsibilities of key members and describes sample return facility requirements; Management: presenting issues surrounding scientific leadership, defining guidelines and assumptions for Institute membership, and proposing a possible funding model; Operations & Data: outlining a science implementation plan that details the preliminary sample examination flow, sample allocation process, and data policies; and Curation: introducing a sample curation plan that comprises sample tracking and routing procedures, sample sterilization considerations, and long-term archiving recommendations. This work presents a summary of the group's activities, findings, and recommendations, highlighting the role of international coordination in managing the returned samples.
78 FR 43915 - Notice of Public Meeting; Southwest Colorado Resource Advisory Council
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-22
... use a telecommunications device for the deaf (TDD) may call the Federal Information Relay Service... working group reports, recreation, fire management, land use planning, invasive species management, energy...
NASA Astrophysics Data System (ADS)
Kolahi, Mahdi; Sakai, Tetsuro; Moriya, Kazuyuki; Makhdoum, Majid F.; Koyama, Lina
2013-08-01
The requirement to assess the management effectiveness (ME) in protected areas (PAs) is increasing around the world to help improve management and accountability. An evaluation of ME for Khojir National Park (KNP), one of the Iran's oldest PAs, was conducted using a multi-method approach that consisted of structured interviews, open interviews, and site visits. This was the first ME evaluation in Iran. The structured interview was based on the management effectiveness tracking tool methodology. KNP received an average score of 43 %, which is lower than the global average, illustrating that its general management was in the low-intermediate level. The indices of legal status, resource inventory, planning for land and water use, regulations, and objectives received the highest average scores, whereas education and awareness, community co-management, regular work plan, boundary demarcation, visitor facilities, budget sources, staff training, protection systems, and management plan received the lowest ones. The management system of KNP was generally established, but many problems of the management still need to be resolved. To improve ME, some countermeasures should be taken, such as increasing funding, strengthening capacity building, planning, and adaptive management, and implementing community participation.
Nurse manager job satisfaction and intent to leave
Warshawsky, Nora E.; Havens, Donna S.
2015-01-01
Background The nurse manager role is critical to staff nurse retention and often the portal to senior nursing leadership, yet little is known about nurse managers' job satisfaction and career plans. The purpose of this study was to describe nurse managers' job satisfaction and intent to leave. Methods An electronic survey was used to collect data from 291 nurse managers working in U.S. hospitals. Findings Seventy percent were satisfied or very satisfied with their jobs and 68% were either likely or very likely to recommend nursing management as a career choice. Seventy-two percent of these nurse managers were also planning to leave their positions in the next five years. The four most common reasons reported for intent to leave included burnout, career change, retirement, and promotion. Burnout was the most common reason cited by the entire sample but the fourth most common reason for leaving cited by those nurse managers who were planning to leave and also satisfied or very satisfied with their positions. Conclusions Recommendations for nursing leaders include evaluating the workload of nurse managers, providing career counseling, and developing succession plans. Additional research is needed to understand the determinants and consequences of nurse manager job satisfaction, intent to leave, and turnover. PMID:24689156
75 FR 27618 - RTCA Government/Industry Air Traffic Management Advisory Committee (ATMAC)
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-17
... Plenary (Welcome and Introductions); Trajectory Operations (TOps) Work Group Presentation of Document... Work Group (NGIWG) Report, Discussion, and possible Next Steps; ADS-B Work Group Presentation of Legacy... Activity Airspace Program (NSAAP) Presentation Requested by Requirements and Planning Work Group, Airspace...
PK-12 Public Educational Facilities Master Plan Evaluation Guide
ERIC Educational Resources Information Center
21st Century School Fund, 2011
2011-01-01
Proper planning of school facilities is critical for all school districts no matter how large or small, whether major construction is in the works or the district is managing enrollment declines. When school districts properly plan for their school facilities they have better schools, more public use and higher value for public spending. This…
75 FR 70670 - Final Vehicle Safety Rulemaking and Research Priority Plan 2010-2013
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-18
... management tool as well as a means to communicate to the public NHTSA's highest priorities to meet the Nation's motor vehicle safety challenges. Among them are programs and projects involving rollover crashes... in this plan. This plan lists the programs and projects the agency anticipates working on even though...
Planning crops and developing propagation protocols [Chapter 3
Douglass F. Jacobs; Kim M. Wilkinson
2009-01-01
Crop planning is an important but often neglected aspect of successful nursery management. Crop planning enables proper scheduling of the necessary time, materials, labor, and space to produce crops. Many painstaking details, such as the careful design of nursery facilities; working with clients; collecting and propagating seeds and cuttings; and making improvements in...
40 CFR 49.154 - Permit application requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
..., production rates and operating schedules. (vii) Identification and description of any existing air pollution... pollution prevention techniques, air pollution control devices, design standards, equipment standards, work... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT General Federal Implementation Plan Provisions...
40 CFR 49.154 - Permit application requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
..., production rates and operating schedules. (vii) Identification and description of any existing air pollution... pollution prevention techniques, air pollution control devices, design standards, equipment standards, work... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT General Federal Implementation Plan Provisions...
40 CFR 49.154 - Permit application requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
..., production rates and operating schedules. (vii) Identification and description of any existing air pollution... pollution prevention techniques, air pollution control devices, design standards, equipment standards, work... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT General Federal Implementation Plan Provisions...
40 CFR 49.154 - Permit application requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., production rates and operating schedules. (vii) Identification and description of any existing air pollution... pollution prevention techniques, air pollution control devices, design standards, equipment standards, work... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT General Federal Implementation Plan Provisions...
Jonathan Thompson
2006-01-01
Some federal forest managers working in late-successional reserves find themselves in a potential no-win situation. The Northwest Forest Plan requires that the reserves be protected from large-scale natural and human disturbances while simultaneously maintaining older forest habitat. This is a challenge for managers working in drier reserves, where forest types are...
Managed competition that works.
Caper, P
1993-05-19
President Clinton has advocated managed competition within a global budget as a long-term strategy for simultaneously controlling health care costs and expanding access to medical care to all Americans. This proposal is intended to show how these two seemingly conflicting goals can be simultaneously accomplished. Managed competition, as it has been conceptualized to date, is primarily a strategy for reforming the system of providing health services. To work, it must be joined with a strategy for reforming our system of financing and paying for those services and of limiting overall system capacity. "Managed Competition That Works" is a proposal that would create a single trust-funded national system of health insurance, implemented through a system of vouchers to individuals. Global budgeting would be accomplished through establishment of the voucher's value each year. The trust fund would pay health plans for all medical care by capitation, but health plans would be free to negotiate a variety of payment arrangements with physicians, hospitals, and other providers. All plans would be required to offer a standard package of benefits, but would have great flexibility in offering benefits beyond the scope of the standard package, if those benefits replace high-cost with lower-cost services or permit the plan to compete more effectively for market share. This proposal would establish firm but acceptable national budget limits; provide universal, comprehensive, and uniform insurance coverage; eliminate cost shifting; encourage competition; reward efficiency-improving innovation; greatly reduce the need for centralized micromanagement of medical care; and retain local determination and a somewhat reduced level of consumer choice. Although this proposal is written as a national plan, trust funds could be implemented at the state level, if problems associated with portability of benefits among states could be solved.
NASA Technical Reports Server (NTRS)
Hunsucker, J. L.
1993-01-01
The purpose of this report is to first present a basis or foundation for the building of an integrated risk management plan and them to present the plan. The integration referred to is across both the temporal and the hierarchical dimensions. Complexity, consequence, and credibility seem to be driving the need for the consideration of risk. Reduction of personal bias and reproducibility of the decision making process seem to be driving the consideration of a formal risk plan. While risk can be used as either a selection tool or a control tool, this paper concentrates on the selection usage. Risk relies on stated purpose. The tightness of the definition of purpose and success is directly reflected in the definition and control of risk. Much of a risk management plan could be designed by the answers to the questions of why, what, who, when, and where. However, any plan must provide the following information about a threat or risk: likelihood, consequence, predictability, reliability, and reproducibility. While the environment at NASA is seen as warm, but not hot, for the introduction of a risk program, some encouragement is seen if the following problems are addressed: no champion, no commitment of resource, confused definitions, lack of direction and focus, a hard sell, NASA culture, many choices of assessment methods, and cost. The plan is designed to follow the normal method of doing work and is structured to follow either the work break down structure or a functional structure very well. The parts of the plan include: defining purpose and success, initial threat assessment, initial risk assessment, reconciling threats and parameters, putting part of the information down and factoring the information back into the decision process as it comes back up, and developing inferences. Two major suggestions are presented. One is to build an office of risk management to be used as a resource by managers in doing the risk process. Another is to form a pilot program to try out the details in the plan and modify the method where needed.
1987-05-01
Construction Division developed to Series 600 structure in response to the need to house recruits during training. The result was a wood frame...building with board and batten siding resting on wooden piers. It was without plumbing and heated with wood -burning stoves. Between the wars, the plans were...personnel had to make do with a variety of coal, wood and oil space heaters which generally worked poorly in terms of heat radiation, making the immediate
75 FR 27814 - Trinity Adaptive Management Working Group
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-18
..., 2010. ADDRESSES: The meeting will be held at the Trinity County Library, 211 Main St., Weaverville, CA... include discussion of the following topics: TRRP budget; Science program proposals and work plan...
Responding Logistically to Future Natural and Man-Made Disasters and Catastrophes
2008-03-15
Logistics Operations, Plans and Exercises, Distribution Management and Property Management. Each competency has associated roles, missions and...professional development. LMD’s Distribution Management Division (DMD) Within the LMD, FEMA also created the Distribution Management Division (DMD...to stock in anticipation of future disasters. A Distribution Management Strategy Working Group was formed with Federal, private and nongovernmental
ALARA database value in future outage work planning and dose management
DOE Office of Scientific and Technical Information (OSTI.GOV)
Miller, D.W.; Green, W.H.
1995-03-01
ALARA database encompassing job-specific duration and man-rem plant specific information over three refueling outages represents an invaluable tool for the outage work planner and ALARA engineer. This paper describes dose-management trends emerging based on analysis of three refueling outages at Clinton Power Station. Conclusions reached based on hard data available from a relational database dose-tracking system is a valuable tool for planning of future outage work. The system`s ability to identify key problem areas during a refueling outage is improving as more outage comparative data becomes available. Trends over a three outage period are identified in this paper in themore » categories of number and type of radiation work permits implemented, duration of jobs, projected vs. actual dose rates in work areas, and accuracy of outage person-rem projection. The value of the database in projecting 1 and 5 year station person-rem estimates is discussed.« less
Parke, Michael R; Weinhardt, Justin M; Brodsky, Andrew; Tangirala, Subrahmaniam; DeVoe, Sanford E
2018-03-01
Does planning for a particular workday help employees perform better than on other days they fail to plan? We investigate this question by identifying 2 distinct types of daily work planning to explain why and when planning improves employees' daily performance. The first type is time management planning (TMP)-creating task lists, prioritizing tasks, and determining how and when to perform them. We propose that TMP enhances employees' performance by increasing their work engagement, but that these positive effects are weakened when employees face many interruptions in their day. The second type is contingent planning (CP) in which employees anticipate possible interruptions in their work and plan for them. We propose that CP helps employees stay engaged and perform well despite frequent interruptions. We investigate these hypotheses using a 2-week experience-sampling study. Our findings indicate that TMP's positive effects are conditioned upon the amount of interruptions, but CP has positive effects that are not influenced by the level of interruptions. Through this study, we help inform workers of the different planning methods they can use to increase their daily motivation and performance in dynamic work environments. (PsycINFO Database Record (c) 2018 APA, all rights reserved).
Language Universalization for Improved Information Management: The Necessity for Esperanto.
ERIC Educational Resources Information Center
Jones, R. Kent
1978-01-01
Discusses problems for information management in dealing with multilingual documentation. The planned language, Esperanto, is suggested as a universal working language because of its neutrality, rational structure, clarity, and expressive power. (Author/CWM)
Kevin C. Ryan; Tonja S. Opperman
2013-01-01
LANDFIRE is the working name given to the Landscape Fire and Resource Management Planning Tools Project (http://www.landfire.gov). The project was initiated in response to mega-fires and the need for managers to have consistent, wall-to-wall (i.e., all wildlands regardless of agency/ownership), geospatial data, on vegetation, fuels, and terrain to support use of fire...
Implications of Organizational Planning for Crisis Relocation.
1982-12-01
AD-A 23 956 IMPLICATIONS OF ORGANIZATIDNAL PLANNING FOR CRISIS RELOCATION(U) NORTH CAROLINA DEPT OF CRIME CONTROL AND PUBLIC SAFETY RALEIG.. M A...policies of the Federal Emergency Management Agency. Division of Emergency Management North Carolina Department of Crime Control and Public Safety...North Carolina Department of Crime Control and Work Unit 0 4412 1 Public Safety, 116 W.Jones St. ,Raleigh, NC 27611 II. CONTROLLING OFFICE NAME AND
NASA Technical Reports Server (NTRS)
Nichol, Janet; King, Bruce; Xiaoli, Ding; Dowman, Ian; Quattrochi, Dale; Ehlers, Manfred
2007-01-01
A policy document on earth observation for urban planning and management resulting from a workshop held in Hong Kong in November 2006 is presented. The aim of the workshop was to provide a forum for researchers and scientists specializing in earth observation to interact with practitioners working in different aspects of city planning, in a complex and dynamic city, Hong Kong. A summary of the current state of the art, limitations, and recommendations for the use of earth observation in urban areas is presented here as a policy document.
Writing a group practice business plan.
Reiboldt, J M
1999-07-01
A business plan offers group practices a blueprint to accomplish a variety of goals, such as securing capital, marketing the practice's services, recruiting new employees, developing a strategic plan or a budget, or planning for growth. A business plan should be informative, specific, and visionary. Elements that every business plan should address are a mission statement, strategy, planning, management information, and action scheme. A business plan should include certain information in a prescribed order. By writing a realistic business plan, group practices can work more efficiently and minimize the risk of not meeting their financial projections.
Potomac Fever: Alice in EEO-Land.
ERIC Educational Resources Information Center
Isbell, Florence B.
1979-01-01
The poor record of affirmative action plans in government demonstrates that the Carter administration's plan to reform the Civil Service is not working. It is the management that has failed to take the steps necessary to translate pronouncements into practice. (Author/EB)
Code of Federal Regulations, 2011 CFR
2011-07-01
...) Comprehensive correctional plan means a plan which represents an integrated approach to the management and... manslaughter, forcible rape, robbery, and aggravated assault as reported to the Federal Bureau of Investigation... offenders, prisoner rehabilitation and treatment programs, prisoner work activities (including to the extent...
Code of Federal Regulations, 2011 CFR
2011-07-01
... ASSISTANCE Financial Assistance for the National Estuary Program § 35.9010 Definitions. Aggregate costs. The... the estuary. Annual work plan. The plan, developed by the Management Conference each year, which... an estuary in the NEP. National Program Assistance Agreements. Assistance Agreements approved by the...
Code of Federal Regulations, 2014 CFR
2014-07-01
... ASSISTANCE Financial Assistance for the National Estuary Program § 35.9010 Definitions. Aggregate costs. The... the estuary. Annual work plan. The plan, developed by the Management Conference each year, which... an estuary in the NEP. National Program Assistance Agreements. Assistance Agreements approved by the...
Code of Federal Regulations, 2013 CFR
2013-07-01
... ASSISTANCE Financial Assistance for the National Estuary Program § 35.9010 Definitions. Aggregate costs. The... the estuary. Annual work plan. The plan, developed by the Management Conference each year, which... an estuary in the NEP. National Program Assistance Agreements. Assistance Agreements approved by the...
Code of Federal Regulations, 2012 CFR
2012-07-01
... ASSISTANCE Financial Assistance for the National Estuary Program § 35.9010 Definitions. Aggregate costs. The... the estuary. Annual work plan. The plan, developed by the Management Conference each year, which... an estuary in the NEP. National Program Assistance Agreements. Assistance Agreements approved by the...
Code of Federal Regulations, 2010 CFR
2010-07-01
... ASSISTANCE Financial Assistance for the National Estuary Program § 35.9010 Definitions. Aggregate costs. The... the estuary. Annual work plan. The plan, developed by the Management Conference each year, which... an estuary in the NEP. National Program Assistance Agreements. Assistance Agreements approved by the...
The 30/20 GHz flight experiment system, phase 2. Volume 4: Experiment system development plan
NASA Technical Reports Server (NTRS)
Bronstein, L.; Kawamoto, Y.; Riberich, J. J.; Scope, J. R.; Forman, B. J.; Bergman, S. G.; Reisenfeld, S.
1981-01-01
The development plan for the 30/20 GHz flight experiment system is presented. A master program schedule with detailed development plans for each subsystem is planned with careful attention given to how technology items to ensure a minimal risk. The work breakdown structure shows the organization of the program management with detailed task definitions. The ROM costs based on the development plan are also given.
Waste Management Project fiscal year 1998 multi-year work plan, WBS 1.2
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jacobsen, P.H.
The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposal of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project, Liquid Effluents Project, and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible.
Strategic Management in the Community College. New Directions for Community Colleges, Number 44.
ERIC Educational Resources Information Center
Myran, Gunder A., Ed.
1983-01-01
Articles in this sourcebook discuss six strategic areas of community college management: external relations, internal communication and working relationships, financial resources development and allocation, program and service development, staff development, and strategic planning. First, "Strategic Management in the Community College,"…
77 FR 54566 - Mid-Atlantic Fishery Management Council (MAFMC); Public Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-05
... Fishery Management Council (MAFMC); Public Meeting AGENCY: National Marine Fisheries Service (NMFS.... SUMMARY: The Mid-Atlantic Fishery Management Council (Council) Staff will hold the second meeting of the Visioning and Strategic Planning Working Group. During this meeting, the group will finalize draft vision...
Assessing climate change-robustness of protected area management plans-The case of Germany.
Geyer, Juliane; Kreft, Stefan; Jeltsch, Florian; Ibisch, Pierre L
2017-01-01
Protected areas are arguably the most important instrument of biodiversity conservation. To keep them fit under climate change, their management needs to be adapted to address related direct and indirect changes. In our study we focus on the adaptation of conservation management planning, evaluating management plans of 60 protected areas throughout Germany with regard to their climate change-robustness. First, climate change-robust conservation management was defined using 11 principles and 44 criteria, which followed an approach similar to sustainability standards. We then evaluated the performance of individual management plans concerning the climate change-robustness framework. We found that climate change-robustness of protected areas hardly exceeded 50 percent of the potential performance, with most plans ranking in the lower quarter. Most Natura 2000 protected areas, established under conservation legislation of the European Union, belong to the sites with especially poor performance, with lower values in smaller areas. In general, the individual principles showed very different rates of accordance with our principles, but similarly low intensity. Principles with generally higher performance values included holistic knowledge management, public accountability and acceptance as well as systemic and strategic coherence. Deficiencies were connected to dealing with the future and uncertainty. Lastly, we recommended the presented principles and criteria as essential guideposts that can be used as a checklist for working towards more climate change-robust planning.
NASA Astrophysics Data System (ADS)
Gopalakrishnan, T.; Saravanan, R.
2017-03-01
Powerful management concepts step-up the quality of the product, time saving in producing the product thereby increase the production rate, improves tools and techniques, work culture, work place and employee motivation and morale. In this paper discussed about the case study of optimizing the tool design, tool parameters to cast off expansion plan according ECRS technique. The proposed designs and optimal tool parameters yielded best results and meet the customer demand without expansion plan. Hence the work yielded huge savings of money (direct and indirect cost), time and improved the motivation and more of employees significantly.
An intelligent decision support system for work zone traffic management and planning.
DOT National Transportation Integrated Search
2004-01-01
Periodic resurfacing, rehabilitation, restoration, and reconstruction work is needed on the aging highway system in the state of Ohio to maintain a desired level of service for the traveling public. However, temporary work zones on highways disrupt t...
Social and economic profile technical guide
David Seesholtz; Denise Wickwar; John C. Russell
2006-01-01
A social and economic profile is a key element of a social assessment. A social and economic assessment or profile is used by line officers, planning staff social scientists, and others to inform both forest planning activities and project-level work. It is important to discover how planning and management decisions made by National Forest System staff will affect...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-10
... additional information. Finally, this notice briefly describes the applicable planning rule and how work done..., or recorded at past public meetings, related to the revision of the GW Forest Plan since 2007 will be..., environmental stresses and threats, societal demands and our current state of scientific knowledge. Also since...
Preservation Planning Program. Study Report. Iowa State University Library. Final Report.
ERIC Educational Resources Information Center
Galejs, John; And Others
This final report is a product of a Preservation Planning Program (PPP) self-study conducted by the Iowa State University, working with the Association of Research Libraries' (ARL) Office of Management Studies. The PPP is designed to put self-help tools into the hands of library staff responsible for developing plans and procedures for preserving…
ERIC Educational Resources Information Center
Illinois Inst. for Environmental Quality, Chicago.
This master plan for environmental and energy higher education in Illinois is a direct result of a mandate from the Illinois General Assembly. To prepare students to confront our nation's environmental problems, each university will submit a management and development plan, designed to preserve existing environmental values and provide…
Federal Student Aid (FSA) Five-Year Strategic Plan. FY 2004-2008
ERIC Educational Resources Information Center
US Department of Education, 2004
2004-01-01
The FSA Five-Year Strategic Plan is a roadmap for FY 2004-2008 that identifies five long-range strategic objectives, tactical short-term goals, and performance management initiatives. In working toward the goals outlined in the plan, FSA will address a number of key challenges, including legacy system migration, business process re-engineering,…
ERIC Educational Resources Information Center
United Nations Educational, Scientific, and Cultural Organization, Bangkok (Thailand). Regional Office for Education in Asia and the Pacific.
The report of a regional seminar on rural development planning specifies as its objectives: to study the problems of rural development planning, and to elucidate training requirements for managers of rural development projects, with particular reference to the links between education and productive work and employment. The first chapter gives…
An international nomenclature for forest work study
Rolf Bjorheden; Michael A. Thompson
2000-01-01
Knowledge gained in the study of forest work is used to improve operational efficiency through better planning and control of future work. Internationally recognized standard methods for recording, evaluating and reporting performance in forest work will greatly enhance the usefulness of this information to managers and planners. A subcommittee of IUFRO Working Party...
An international nomenclature for forest work study
Rolf Björheden; Michael A. Thompson
2000-01-01
Knowledge gained in the study of forest work is used to improve operational efficiency through better planning and control of future work. Internationally recognized standard methods for recording, evaluating and reporting performance in forest work will greatly enhance the usefulness of this information to managers and planners. A subcommittee of IUFRO Working Party $...
NATURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.
DOE Office of Scientific and Technical Information (OSTI.GOV)
GREEN,T.ET AL.
2003-12-31
Brookhaven National Laboratory (BNL) is located near the geographic center of Long Island, New York. The Laboratory is situated on 5,265 acres of land composed of Pine Barrens habitat with a central area developed for Laboratory work. In the mid-1990s BNL began developing a wildlife management program. This program was guided by the Wildlife Management Plan (WMP), which was reviewed and approved by various state and federal agencies in September 1999. The WMP primarily addressed concerns with the protection of New York State threatened, endangered, or species of concern, as well as deer populations, invasive species management, and the revegetationmore » of the area surrounding the Relativistic Heavy Ion Collider (RHIC). The WMP provided a strong and sound basis for wildlife management and established a basis for forward motion and the development of this document, the Natural Resource Management Plan (NRMP), which will guide the natural resource management program for BNL. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL. The appendices provide specific management requirements for threatened and endangered amphibians and fish (Appendices A and B respectively), lists of actions in tabular format (Appendix C), and regulatory drivers for the Natural Resource Program (Appendix D). The purpose of the Natural Resource Management Plan is to provide management guidance, promote stewardship of the natural resources found at BNL, and to integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, adaptive ecosystem management, compliance, integration with other plans and requirements, and incorporation of community involvement, where applicable.« less
Final Inventory Work-Off Plan for ORNL transuranic wastes (1986 version)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dickerson, L.S.
1988-05-01
The Final Inventory Work-Off Plan (IWOP) for ORNL Transuranic Wastes addresses ORNL's strategy for retrieval, certification, and shipment of its stored and newly generated contact-handled (CH) and remote-handled (RH) transuranic (TRU) wastes to the Waste Isolation Pilot Plant (WIPP), the proposed geologic repository near Carlsbad, New Mexico. This document considers certification compliance with the WIPP waste acceptance criteria (WAC) and is consistent with the US Department of Energy's Long-Range Master Plan for Defense Transuranic Waste Management. This document characterizes Oak Ridge National Laboratory's (ORNL's) TRU waste by type and estimates the number of shipments required to dispose of it; describesmore » the methods, facilities, and systems required for its certification and shipment; presents work-off strategies and schedules for retrieval, certification, and transportation; discusses the resource needs and additions that will be required for the effort and forecasts costs for the long-term TRU waste management program; and lists public documentation required to support certification facilities and strategies. 22 refs., 6 figs., 10 tabs.« less
Managing the construction bidding process : a move to simpler construction plan sets
DOT National Transportation Integrated Search
2001-01-31
This project was conducted to determine whether construction plan sets could be significantly simplified to speed the process of moving projects to construction. The work steps included a literature review, a telephone survey of highway agencies in s...
MAINTENANCE MANAGEMENT ACCOUNTING SYSTEM OF WASTE WATER DISPOSAL SYSTEMS
NASA Astrophysics Data System (ADS)
Hori, Michihiro; Tsuruta, Takashi; Kaito, Kiyoyuki; Kobayashi, Kiyoshi
Sewage works facilities consist of various assets groups. And there are many kinds of financial resources. In order to optimize the maintenance plan, and to secure the stability and sustainability of sewage works management, it is necessary to carry out financial simulation based on the life-cycle cost analysis. Furthermore, it is important to develop management accounting system that is interlinked with the financial accounting system, because many sewage administration bodies have their financial accounting systems as public enterprises. In this paper, a management accounting system, which is designed to provide basic information for asset management of sewage works facilities, is presented. Also the applicability of the management accounting system presented in this paper is examined through financial simulations.
Using modeling and simulation tools for work zone analysis
DOT National Transportation Integrated Search
2009-05-01
Work Zone Planning and Management have become more challenging because of increasing travel demand and an aging roadway network infrastructure facing more frequent maintenance and major rehabilitation projects, while still needing to transport people...
ERIC Educational Resources Information Center
Saeed, Rajaeepour; Azizollah, Arbabisarjou; Zahra, Amiri; Abdolghayoum, Nematiniya; Zaman, Ajdai; Peyman, Yarmohammadzadeh
2011-01-01
Assuring job satisfaction, over a long-term, requires managers' styles, careful planning and effort both by management and by workers. Job satisfaction is influenced by the employee's personal characteristics, the manager's personal characteristics and management style, and the nature of the work itself. The aim of this study was to determine the…
1987-09-01
The AFV ACRMP is the Task Force Director’s (08) tool to manage command, control, communication (C3) automation system life cycle developments for the...responsibilities, development management, acquisition strategy, testing , life cycle support, technology assessment and work group relationships. ACRMP
ERIC Educational Resources Information Center
Brewer, Julie; And Others
1995-01-01
Presents three articles that discuss customer service in libraries, with a focus on planning for service management, a customer service program for library staff, and a quality improvement process. Highlights include developing and implementing service strategies, dealing with requests, redefining work relationships, coworkers as customers,…
Stakeholder benefit from depression disease management: differences by rurality?
Xu, Stanley; Rost, Kathryn; Dong, Fran; Dickinson, L Miriam
2011-01-01
Despite increasing consensus about the value of depression disease management programs, the field has not identified which stakeholders should absorb the relatively small additional costs associated with these programs. This paper investigates whether two proposed stakeholders (health plans and employer purchasers) economically benefit from depression care management (reduced outpatient utilization and work costs, respectively) in two delivery systems (rural and urban). This study examined the main and differential effects of depression care management on outpatient utilization and work costs over 24 months in a preplanned secondary analysis of 479 depressed patients from rural and urban primary care practices in a randomized controlled trial. Over 24 months, the intervention did not significantly reduce outpatient utilization costs in the entire cohort (-$191, 95% confidence interval (CI)=-$2,083 to $1,647), but it did decrease work costs (-$1,970, 95% CI=-$3,934 to -$92). While not statistically significant, rural-urban differences in work costs were in the same direction, while rural-urban differences in utilization costs differed in direction. These findings provide preliminary evidence that employers who elect to cover depression care management costs should receive comparable economic benefits in the rural and urban employees they insure. Given the limited sample size, further research may be needed to determine whether health plans who elect to cover depression care management costs will receive comparable economic benefits in the rural and urban enrollees they insure.
2014-01-01
Background Recent initiatives to target the personal, social and clinical needs of people with long-term health conditions have had limited impact within primary care. Evidence of the importance of social networks to support people with long-term conditions points to the need for self-management approaches which align personal circumstances with valued activities. The Patient-Led Assessment for Network Support (PLANS) intervention is a needs-led assessment for patients to prioritise their health and social needs and provide access to local community services and activities. Exploring the work and practices of patients and telephone workers are important for understanding and evaluating the workability and implementation of new interventions. Methods Qualitative methods (interviews, focus group, observations) were used to explore the experience of PLANS from the perspectives of participants and the telephone support workers who delivered it (as part of an RCT) and the reasons why the intervention worked or not. Normalisation Process Theory (NPT) was used as a sensitising tool to evaluate: the relevance of PLANS to patients (coherence); the processes of engagement (cognitive participation); the work done for PLANS to happen (collective action); the perceived benefits and costs of PLANS (reflexive monitoring). 20 patients in the intervention arm of a clinical trial were interviewed and their telephone support calls were recorded and a focus group with 3 telephone support workers was conducted. Results Analysis of the interviews, support calls and focus group identified three themes in relation to the delivery and experience of PLANS. These are: formulation of ‘health’ in the context of everyday life; trajectories and tipping points: disrupting everyday routines; precarious trust in networks. The relevance of these themes are considered using NPT constructs in terms of the work that is entailed in engaging with PLANS, taking action, and who is implicated this process. Conclusions PLANS gives scope to align long-term condition management to everyday life priorities and valued aspects of life. This approach can improve engagement with health-relevant practices by situating them within everyday contexts. This has potential to increase utilisation of local resources with potential cost-saving benefits for the NHS. Trial registration ISRCTN45433299. PMID:24938492
Improving DOE Project Performance Using the DOD Integrated Master Plan - 12481
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alleman, Glen B.; Nosbisch, Michael R.
2012-07-01
DOE O 413 measures a project's progress to plan by the consumption of funding, the passage of time, and the meeting of milestones. In March of 2003, then Under Secretary, Energy, Science, Card received a memo directing the implementation of Project Management and the Project Management Manual, including the Integrated Master Plan and Integrated Master Schedule. This directive states 'the integrated master plan and schedule tie together all project tasks by showing their logical relationships and any constraints controlling the start or finish of each task. This process results in a hierarchy of related functional and layered schedules derived frommore » the Work Breakdown Structure that can be used for monitoring and controlling project progress'. This paper shows how restoring the IMP/IMS paradigm to DOE program management increases the probability of program success in ways not currently available using DOD O 413 processes alone. Using DOE O 413 series guidance, adding the Integrated Master Plan and Integrated Master Schedule paradigm would provide a hierarchical set of performance measures for each 'package of work,' that provides measurable visibility to the increasing maturity of the project. This measurable maturity provides the mechanism to forecast future performance of cost, schedule, and technical outcomes in ways not available using just the activities in DOE O 413. With this information project managers have another tool available to address the issues identified in GAO-07-336 and GAO-09-406. (authors)« less
DOT National Transportation Integrated Search
2004-01-01
Problem: Periodic resurfacing, rehabilitation, restoration, and reconstruction work is needed on the aging highway system in the state of Ohio to maintain a desired level of service for the traveling public. However, temporary work zones on highways ...
Working Notes from the 1992 AAAI Spring Symposium on Practical Approaches to Scheduling and Planning
NASA Technical Reports Server (NTRS)
Drummond, Mark; Fox, Mark; Tate, Austin; Zweben, Monte
1992-01-01
The symposium presented issues involved in the development of scheduling systems that can deal with resource and time limitations. To qualify, a system must be implemented and tested to some degree on non-trivial problems (ideally, on real-world problems). However, a system need not be fully deployed to qualify. Systems that schedule actions in terms of metric time constraints typically represent and reason about an external numeric clock or calendar and can be contrasted with those systems that represent time purely symbolically. The following topics are discussed: integrating planning and scheduling; integrating symbolic goals and numerical utilities; managing uncertainty; incremental rescheduling; managing limited computation time; anytime scheduling and planning algorithms, systems; dependency analysis and schedule reuse; management of schedule and plan execution; and incorporation of discrete event techniques.
MDOT Pavement Management System : Prediction Models and Feedback System
DOT National Transportation Integrated Search
2000-10-01
As a primary component of a Pavement Management System (PMS), prediction models are crucial for one or more of the following analyses: : maintenance planning, budgeting, life-cycle analysis, multi-year optimization of maintenance works program, and a...
Preventing readmissions through comprehensive discharge planning.
Hunter, Tabitha; Nelson, James Rex; Birmingham, Jackie
2013-01-01
Case managers, including nurses and social workers, provide essential services to hospitalized patients, including mandated discharge planning that has been shown to impact patient safety and patient outcomes. The heightened attention to readmission is evident in both reimbursement and accreditation initiatives. The Centers for Medicare & Medicaid Services, Office of Clinical Standards & Quality/Survey & Certification Group, is revising worksheets to be used by surveyors to review how hospitals are complying with the Medicare Conditions of Participation with a focus on discharge planning as it relates to patient safety. This is an opportunity for case managers to apply the principles of case management to the targeted problem of readmissions. Now case managers must identify the reasons for readmission on a patient-by-patient basis, collect data, analyze processes, and then change practice in the hospital and work more closely with community-based providers. The purpose of this article is to recommend improvement in a consistent case management practice that will positively influence patient readmissions. Hospital-based case managers who are responsible for discharge planning functions. Hospital administrators will also find this information valuable as a tool to assess strategies to control preventable readmissions and to comply with the Medicare Conditions of Participation for discharge planning. Hospital-based case managers, responsible for discharge planning, have a unique opportunity to interact face-to-face with patients who are readmitted to determine factors that lead to the readmission. Case managers need to change their practice to include assessing patients on the basis of their prior level of care. Pharmacists need to play a bigger role in discharge planning, especially for patients who have experienced a potentially avoidable readmission. Working closely with community-based providers is essential to target reasons for readmission. The Medicare Conditions of Participation for Discharge Planning can be used not only to show compliance but as tools to evaluate current practice and identify areas of improvement. Preventable readmissions or rehospitalizations directly affect patient safety, patient outcome, hospital reimbursement, and hospital accreditation. Preventable readmissions can be controlled by comprehensive discharge planning. Case managers are directly involved in discharge planning and thus have direct accountability regarding readmissions; therefore, they must refine the admission assessment screening to include specific information based on a patient's preadmission level of care. Collaboration with community-based providers is essential to managing readmissions or rehospitalizations. Hospitals will find it beneficial to track readmissions by using specific data points unique to readmissions such as source of admission and previous length of stay. Self-assessment of compliance will help identify opportunities for quality improvement in the case management department. PLEASE NOTE: Rules and regulations are constantly changing. It is critical to monitor changes in standards. Information contained in this article is current at the time of submission, and readers are encouraged to review the content of this article with administration before implementing changes.
[Occupational health protection in business economics--business plan for health intervention].
Rydlewska-Liszkowska, Izabela
2011-01-01
One of the company's actions for strengthening human capital is the protection of health and safety of its employees. Its implementation needs financial resources, therefore, employers expect tangible effectiveness in terms of health and economics. Business plan as an element of company planning can be a helpful tool for new health interventions management. The aim of this work was to elaborate a business plan framework for occupational health interventions at the company level, combining occupational health practices with company management and economics. The business plan of occupational health interventions was based on the literature review, the author's own research projects and meta-analysis of research reports on economic relations between occupational health status and company productivity. The study resulted in the development of the business plan for occupational health interventions at the company level. It consists of summary and several sections that address such issues as the key elements of the intervention discussed against a background of the company economics and management, occupational health and safety status of the staff, employees' health care organization, organizational plan of providing the employees with health protection, marketing plan, including specificity of health interventions in the company marketing plan and financial plan, reflecting the economic effects of health care interventions on the overall financial management of the company. Business plan defines occupational health and safety interventions as a part of the company activities as a whole. Planning health care interventions without relating them to the statutory goals of the company may have the adverse impact on the financial balance and profitability of the company. Therefore, business plan by providing the opportunity of comparing different options of occupational health interventions to be implemented by employers is a key element of the management of employees' health.
U.S. Department of Energy, Office of Legacy Management Program Update, April-June 2009
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2009-04-01
Welcome to the April-June 2009 issue of the U.S. Department of Energy (DOE) Office of Legacy Management (LM) Program Update. This publication is designed to provide a status of activities within LM. The Legacy Management goals are: (1) Protect human health and the environment through effective and efficient long-term surveillance and maintenance - This goal highlights DOE's responsibility to ensure long-term protection of people, the environment, and the integrity of engineered remedies and monitoring systems. (2) Preserve, protect, and make accessible legacy records and information - This goal recognizes LM's commitment to successfully manage records, information, and archives of legacymore » sites under its authority. (3) Support an effective and efficient work force structured to accomplish Departmental missions and assure continuity of contractor worker pension and medical benefits - This goal recognizes DOE's commitment to its contracted work force and the consistent management of pension and health benefits. As sites continue to close, DOE faces the challenges of managing pension plan and health benefits liability. (4) Manage legacy land and assets, emphasizing protective real and personal property reuse and disposition - This goal recognizes a DOE need for local collaborative management of legacy assets, including coordinating land use planning, personal property disposition to community reuse organizations, and protecting heritage resources (natural, cultural, and historical). (5) Improve program effectiveness through sound management - This goal recognizes that LM's goals cannot be attained efficiently unless the federal and contractor work force is motivated to meet requirements and work toward continuous performance improvement.« less
A Teacher's Guide to Individualizing Reading.
ERIC Educational Resources Information Center
Utah System Approach to Individualized Learning Project.
The objective of this teaching guide is to provide a comprehensive system for individualizing reading instruction through planning, organization, management, and skillful teaching. The planning stage involves establishing goals, reality bases, work bases and flows, and review, evaluation, and revision. The organization of program content involves…
A Conceptual Framework for Adaptive Project Management in the Department of Defense
2016-04-30
schedule work) established a core set of principles that went unchallenged until the start of the 21st century. This belief that managing...detailed planning, task decomposition and assignment of hours at the start of a project as unnecessary, often wasted effort that sacrifices accuracy...with the illusion of precision. Work, at the task level, is best assigned by the team performing the work as close as possible to the actual start
Workplace Violence and Components of a Psychologically Healthy Workplace.
Hart, Rod; Heybrock, Denise
2017-01-01
As episodes of workplace-centered violence have increased in the United States, a focus on emotional and mental health matters is more essential than ever. It is imperative for organizations to be proactive about violence prevention and have a plan that is supported by top management and understood by all managers and employees. Employers can take a number of steps in collaboration with a comprehensive violence prevention plan to promote a supportive and safe work environment. This article addresses workplace violence, risk factors and the components of a violence prevention plan as well as the importance of building a psychologically healthy workplace.
NASA Technical Reports Server (NTRS)
Welby, C. W. (Principal Investigator); Lammi, J. O.; Carson, R. J., III
1974-01-01
The author has identified the following significant results. ERTS-1 imagery has been evaluated for use in resource planning and management in North Carolina, and found to be useful for general reconnaissance purposes in forestry, geology, and water resources work. It has also been used for studying large-scale transient phenomena such as river plumes and movement of sediment in the sounds. ERTS-1 imagery has been an aid to geologic and land-use mapping. Stereoscopes, projectors of various kinds, and microscopes have proved useful instruments for the kinds of data acquisition needed by resource planners and managers.
Integrated Workforce Planning Model: A Proof of Concept
NASA Technical Reports Server (NTRS)
Guruvadoo, Eranna K.
2001-01-01
Recently, the Workforce and Diversity Management Office at KSC have launched a major initiative to develop and implement a competency/skill approach to Human Resource management. As the competency/skill dictionary is being elaborated, the need for a competency-based workforce-planning model is recognized. A proof of concept for such a model is presented using a multidimensional data model that can provide the data infrastructure necessary to drive intelligent decision support systems for workforce planing. The components of competency-driven workforce planning model are explained. The data model is presented and several schemes that would support the workforce-planning model are presented. Some directions and recommendations for future work are given.
Hofflander, Malin; Nilsson, Lina; Eriksén, Sara; Borg, Christel
2016-03-01
This article describes healthcare managers' experiences of leading the implementation of video conferencing in discharge planning sessions as a new tool in everyday practice. Data collection took place through individual interviews and the interviews were analyzed using qualitative content analysis with an inductive approach. The results indicate that managers identified two distinct leadership perspectives when they reflected on the implementation process. They described a desired way of leading the implementation and communicating about the upcoming change, understanding and securing support for decisions, as well as ensuring that sufficient time is available throughout the change process. They also, however, described how they perceived that the implementation process was actually taking place, highlighting the lack of planning and preparation as well as the need for support and to be supportive, and having the courage to adopt and lead the implementation. It is suggested that managers at all levels require more information and training in how to encourage staff to become involved in designing their everyday work and in the implementation process. Managers, too, need ongoing organizational support for good leadership throughout the implementation of video conferencing in discharge planning sessions, including planning, start-up, implementation, and evaluation.
Nielsen, Karina; Cleal, Bryan
2010-04-01
Flow (a state of consciousness where people become totally immersed in an activity and enjoy it intensely) has been identified as a desirable state with positive effects for employee well-being and innovation at work. Flow has been studied using both questionnaires and Experience Sampling Method (ESM). In this study, we used a newly developed 9-item flow scale in an ESM study combined with a questionnaire to examine the predictors of flow at two levels: the activities (brainstorming, planning, problem solving and evaluation) associated with transient flow states and the more stable job characteristics (role clarity, influence and cognitive demands). Participants were 58 line managers from two companies in Denmark; a private accountancy firm and a public elder care organization. We found that line managers in elder care experienced flow more often than accountancy line managers, and activities such as planning, problem solving, and evaluation predicted transient flow states. The more stable job characteristics included in this study were not, however, found to predict flow at work. Copyright 2010 APA, all rights reserved.
Benjamin Skolnik; David Wiedenfeld; Randy Dettmers; Constantino Aucca; Lina Daza; Heidy Valle; Francisco Sornoza; Javier Robayo; David Diaz; Jane Fitzgerald; Daniel Lebbin; Paul B. Hamel
2012-01-01
Vital to the work of the Cerulean Warbler Technical Group has been the collaboration among members to evaluate population status and coordinate planning for future activities, principally in conservation implementation. Two plans have been produced, one a general strategy for the conservation and management of the species over its entire range, and a more restricted...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Assessment work. 9.7 Section... MANAGEMENT Mining and Mining Claims § 9.7 Assessment work. (a) An access permit and approved plan of operations must be obtained by a claimant prior to the performance of any assessment work required by Revised...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Assessment work. 9.7 Section... MANAGEMENT Mining and Mining Claims § 9.7 Assessment work. (a) An access permit and approved plan of operations must be obtained by a claimant prior to the performance of any assessment work required by Revised...
Fisichelli, Nicholas A.; Schuurman, Gregor; Symstad, Amy J.; Ray, Andrea; Friedman, Jonathan M.; Miller, Brian; Rowland, Erika
2016-01-01
The Scaling Climate Change Adaptation in the Northern Great Plains through Regional Climate Summaries and Local Qualitative-Quantitative Scenario Planning Workshops project synthesizes climate data into 3-5 distinct but plausible climate summaries for the northern Great Plains region; crafts quantitative summaries of these climate futures for two focal areas; and applies these local summaries by developing climate-resource-management scenarios through participatory workshops and, where possible, simulation models. The two focal areas are central North Dakota and southwest South Dakota (Figure 1). The primary objective of this project is to help resource managers and scientists in a focal area use scenario planning to make management and planning decisions based on assessments of critical future uncertainties.This report summarizes project work for public and tribal lands in the central North Dakota focal area, with an emphasis on Knife River Indian Villages National Historic Site. The report explainsscenario planning as an adaptation tool in general, then describes how it was applied to the central North Dakota focal area in three phases. Priority resource management and climate uncertainties were identified in the orientation phase. Local climate summaries for relevant, divergent, and challenging climate scenarios were developed in the second phase. In the final phase, a two-day scenario planning workshop held November 12-13, 2015 in Bismarck, ND, featured scenario development and implications, testing management decisions, and methods for operationalizing scenario planning outcomes.
Fisichelli, Nicholas A.; Schuurman, Gregor W.; Symstad, Amy J.; Ray, Andrea; Miller, Brian; Cross, Molly; Rowland, Erika
2016-01-01
The Scaling Climate Change Adaptation in the Northern Great Plains through Regional Climate Summaries and Local Qualitative-Quantitative Scenario Planning Workshops project synthesizes climate data into 3-5 distinct but plausible climate summaries for the northern Great Plains region; crafts quantitative summaries of these climate futures for two focal areas; and applies these local summaries by developing climate-resource-management scenarios through participatory workshops and, where possible, simulation models. The two focal areas are central North Dakota and southwest South Dakota (Figure 1). The primary objective of this project is to help resource managers and scientists in a focal area use scenario planning to make management and planning decisions based on assessments of critical future uncertainties.This report summarizes project work for public and tribal lands in the southwest South Dakota grasslands focal area, with an emphasis on Badlands National Park and Buffalo Gap National Grassland. The report explains scenario planning as an adaptation tool in general, then describes how it was applied to the focal area in three phases. Priority resource management and climate uncertainties were identified in the orientation phase. Local climate summaries for relevant, divergent, and challenging climate scenarios were developed in the second phase. In the final phase, a two-day scenario planning workshop held January 20-21, 2016 in Rapid City, South Dakota, featured scenario development and implications, testing management decisions, and methods for operationalizing scenario planning outcomes.
Scalable collaborative risk management technology for complex critical systems
NASA Technical Reports Server (NTRS)
Campbell, Scott; Torgerson, Leigh; Burleigh, Scott; Feather, Martin S.; Kiper, James D.
2004-01-01
We describe here our project and plans to develop methods, software tools, and infrastructure tools to address challenges relating to geographically distributed software development. Specifically, this work is creating an infrastructure that supports applications working over distributed geographical and organizational domains and is using this infrastructure to develop a tool that supports project development using risk management and analysis techniques where the participants are not collocated.
MSFC personnel management tasks: Recruitment and orientation of new employees
NASA Technical Reports Server (NTRS)
Brindley, T. A.
1980-01-01
In order to encourage highly motivated young students to learn about NASA and consider it for a career, a formal program is to be initiated whereby selected students can work on a voluntary basis at Marshall Space Flight Center (MSFC). The first task was to develop the working plan and procedures for this program, called Student Volunteer Service Program, in the writing of MSFC official guidelines, the Marshall Management Instruction (the MMI) which is a binding document that defines policy and establishes procedures and guidelines. Particular considerations written into the MMI after numerous consultations, interviews, and discussions about a satisfactory policy, include: arrangements to be made between the student, the school authorities, and concerned MSFC employees; management of the work assignments; and procedures for the student's welfare and safety. The second task was the development of a recruitment brochure for the attraction of new employees, especially scientists and engineers. The third task assigned was to develop a plan called Orientation of New Employees.
Manpower Planning in the Zimbabwe Public Sector: A Myth or Reality?
1994-09-01
demands accurate worker data and the coordination of the management development function. (Robbins, 1984) 201n his book, Principles of Management , J...Ahuja, K. K., Personnel Management : Kalyani Publishers, New Dehli , 1983. 2. Beach, Dale, S., Personnel Management : The Management of People at Work...1215 Jefferson Davis Highway. Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188
Handling Conflict in the Work Environment.
ERIC Educational Resources Information Center
Brewer, Ernest W.
1997-01-01
Discussion of workplace conflict management examines erroneous assumptions inherent in traditional reaction patterns, considers key elements of planning for conflict prevention, and some workplace strategies to help minimize conflicts. Several approaches to conflict management, and their outcomes, are highlighted, and stages of the…
The Denver region traffic signal system improvement program : planning for management and operations
DOT National Transportation Integrated Search
2009-04-01
The Denver Regional Council of Governments (DRCOG) works with over 30 local jurisdictions on the Traffic Signal System Improvement Program (TSSIP), a combination of management and operations strategies designed to time and coordinate traffic signals ...
Tibandebage, Paula; Kida, Tausi; Mackintosh, Maureen; Ikingura, Joyce
2016-10-01
Maternal mortality is very high in Tanzania. Competent hospital care is key to improving maternal outcomes, but there is a crisis of availability and performance of health workers in maternal care. This article uses interviews with managers, nurse-midwives, and women who had given birth in two hospitals providing virtually all the emergency maternal care in one Tanzania city. It contrasts women's experience in the two hospitals, and analyses interconnections with nurse-midwives' and managers' experiences of working conditions. The conceptual literature on nurse empowerment identifies some key explanatory variables for these contrasts. Staff experienced less frustration and constraint in one of the hospitals; had more access to structurally empowering resources; and experienced greater congruence between job commitment and working culture, resulting in better work engagement. Conversely, nurse-midwives in the other hospital were constrained by supply shortages and recurrent lack of support. Contrasting management styles and their impacts demonstrate that even in severely resource-constrained environments, there is room for management to empower staff to improve maternal care. Empowering management practices include participatory management, supportive supervision, better incentives, and clear leadership concerning ward culture. Structural constraints beyond the capacity of health facility managers must however also be addressed. © 2015 The Authors. International Journal of Health Planning and Management published by John Wiley & Sons, Ltd. © 2015 The Authors. International Journal of Health Planning and Management published by John Wiley & Sons, Ltd.
TRU Waste Management Program. Cost/schedule optimization analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.
This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, taskmore » guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less
What Climate Information Do Water Managers Need to Make Robust, Long-Term Plans?
NASA Astrophysics Data System (ADS)
Duran, R.; Lempert, R.; Groves, D.
2008-12-01
What climate information do water managers need to respond to threat of climate change? Southern California's Inland Empire Utilities Agency (IEUA) completed a long-range water resource management plan in 2005 that addressed expected economic and population growth in their service region, but did not consider the potential impacts of climate change. Using a robust decision making (RDM) approach for policy under deep uncertainty, we recently worked with IEUA to conduct a climate-change vulnerability and response options analysis of the agency's long-range plans. This analysis suggests that IEUA is vulnerable to future climate change, but can significantly reduce this vulnerability by increasing their near-term conservation programs and careful monitoring and updating to adjust their plan in the years ahead. In addition to helping IEUA, this analysis provides important guidance on the types of climate and other information that can be most useful for water managers as they attempt to take robust, near-term actions to increaase their resilience to climate change.
Time management strategies for research productivity.
Chase, Jo-Ana D; Topp, Robert; Smith, Carol E; Cohen, Marlene Z; Fahrenwald, Nancy; Zerwic, Julie J; Benefield, Lazelle E; Anderson, Cindy M; Conn, Vicki S
2013-02-01
Researchers function in a complex environment and carry multiple role responsibilities. This environment is prone to various distractions that can derail productivity and decrease efficiency. Effective time management allows researchers to maintain focus on their work, contributing to research productivity. Thus, improving time management skills is essential to developing and sustaining a successful program of research. This article presents time management strategies addressing behaviors surrounding time assessment, planning, and monitoring. Herein, the Western Journal of Nursing Research editorial board recommends strategies to enhance time management, including setting realistic goals, prioritizing, and optimizing planning. Involving a team, problem-solving barriers, and early management of potential distractions can facilitate maintaining focus on a research program. Continually evaluating the effectiveness of time management strategies allows researchers to identify areas of improvement and recognize progress.
NASA Astrophysics Data System (ADS)
Jin, Cheng-Jie; Wang, Wei; Jiang, Rui
2016-08-01
The proper setting of traffic signals at signalized intersections is one of the most important tasks in traffic control and management. This paper has evaluated the four-phase traffic signal plans at a four-leg intersection via cellular automaton simulations. Each leg consists of three lanes, an exclusive left-turn lane, a through lane, and a through/right-turn lane. For a comparison, we also evaluate the two-phase signal plan. The diagram of the intersection states in the space of inflow rate versus turning ratio has been presented, which exhibits four regions: In region I/II/III, congestion will propagate upstream and laterally and result in queue spillover with both signal plans/two-phase signal plan/four-phase signal plan, respectively. Therefore, neither signal plan works in region I, and only the four-phase signal plan/two-phase signal plan works in region II/III. In region IV, both signal plans work, but two-phase signal plan performs better in terms of average delays of vehicles. Finally, we study the diagram of the intersection states and average delays in the asymmetrical configurations.
40 CFR 35.917 - Facilities planning (step 1).
Code of Federal Regulations, 2013 CFR
2013-07-01
... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917... the most economical means of meeting established effluent and water quality goals while recognizing... projection totals and disaggregations in approved water quality management (WQM) plans. (See paragraph 8a(3...
40 CFR 35.917 - Facilities planning (step 1).
Code of Federal Regulations, 2014 CFR
2014-07-01
... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917... the most economical means of meeting established effluent and water quality goals while recognizing... projection totals and disaggregations in approved water quality management (WQM) plans. (See paragraph 8a(3...
ERIC Educational Resources Information Center
Brown, Joseph
2006-01-01
In this article, the author discusses a literature-based character education program at the school district of Hillsborough County in Florida. The district recently developed a comprehensive management plan in response to the much-publicized school violence of recent years. The plan addresses school issues including tornado and fire drills,…
Automated Procurement System (APS) revised project management plan (DS-03)
NASA Technical Reports Server (NTRS)
Murphy, Diane R.
1995-01-01
The Project Plan is the governing document for the implementation of the Automated Procurement System (APS). It includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.
NOAA/NCEI/Regional Climate Services: Working with Partners and Stakeholders across a Wide Network
NASA Astrophysics Data System (ADS)
Mecray, E. L.
2015-12-01
Federal agencies all require plans to be prepared at the state level that outline the implementation of funding to address wildlife habitat, human health, transportation infrastructure, coastal zone management, environmental management, emergency management, and others. These plans are now requiring the consideration of changing climate conditions. So where does a state turn to discuss lessons learned, obtain tools and information to assess climate conditions, and to work with other states in their region? Regional networks and collaboratives are working to deliver this sector by sector. How do these networks work? Do they fit together in any way? What similarities and differences exist? Is anyone talking across these lines to find common climate information requirements? A sketch is forming that links these efforts, not by blending the sectors, but by finding the areas where coordination is critical, where information needs are common, and where delivery mechanisms can be streamlined. NOAA/National Centers for Environmental Information's Regional Climate Services Directors have been working at the interface of stakeholder-driven information delivery since 2010. This talk will outline the regional climate services delivery framework for the Eastern Region, with examples of regional products and information.
Project Portfolio Management for Academic Libraries: A Gentle Introduction
ERIC Educational Resources Information Center
Vinopal, Jennifer
2012-01-01
In highly dynamic, service-oriented environments like academic libraries, much staff time is spent on initiatives to implement new products and services to meet users' evolving needs. Yet even in an environment where a sound project management process is applied, if we're not properly planning, managing, and controlling the organization's work in…
Management by Objectives: Authentic Assessment in a Public Relations Practicum.
ERIC Educational Resources Information Center
Fall, Lisa T.
Incorporation of management principles in the classroom can motivate students to successfully complete project work. The Communication Arts Department at Georgia Southern University developed a Public Relations Event Management course in which the students were responsible for planning a campus-wide special event to raise funds for two clients.…
Central Office and Site-Based Management: An Educator's Guide.
ERIC Educational Resources Information Center
Sewall, Angela Maynard
This book describes changes that must be made in central-office administration to facilitate the movement to site-based management. It is intended for educational administrators in central administration or for those who are planning to work as superintendents, business managers, or supervisors of curriculum and instruction. The book covers all…
Forest fuels treatments for wildlife management: do local recreation users agree?
Jeamok Kwon; Christine Vogt; Greg Winter; Sarah McCaffrey
2008-01-01
In recent years, managers, policy makers and researchers, particularly in the social sciences, have worked to better understand the perspectives of homeowners, residents, tourists, and recreationists on wildfire and fuels management and how resource agencies can better involve these stakeholders in planning and implementation (Vogt et al., 2006). This research examined...
Azorbo, S; Muna, C
1993-01-01
The training and technical assistance programs of the Center for African Family Studies (CAFS), which is part of the International Planned Parenthood Federation for the African Region, were described. Programs included service delivery, management development, family life education, family planning communication, and research monitoring and evaluation. Several courses were offered: a week-long contraceptive technology update course for trainers and supervisors of family planning programs. Management training needs were filled through a 6-week middle level management course, a 2-week senior level management course, a 4-week community based family planning program course, a 6-week financial management of family planning and reproductive health programs course, and a 5-week course in leadership skills for management of women and health programs. Family life education courses were offered under the CAFS Women and Health Program for teachers, curriculum developers, youth leaders, and those working with young people for 3 weeks. Course issues of discussion included population and development, the family in contemporary African life, and policy legislation and laws to promote young people's health and social psychological and ethical aspects of adolescent sexuality. Family planning communication training programs were directed to strengthening IEC knowledge and skills over a 4-week period for senior and middle level personnel. The 3-week press course aimed to train journalists in print and electronic media for French-speaking countries who could gain cover population and family planning issues. The family planning research and evaluation course over 4 weeks aimed to increase the knowledge and skills of health personnel in project design, implementation, monitoring, and evaluation, in order to conduct assessment of program effectiveness. The course was directed to senior and middle level manager researchers, population project directors, and personnel of women-centered projects.
NASA Astrophysics Data System (ADS)
Shumchenia, Emily J.; Guarinello, Marisa L.; Carey, Drew A.; Lipsky, Andrew; Greene, Jennifer; Mayer, Larry; Nixon, Matthew E.; Weber, John
2015-06-01
Efforts are in motion globally to address coastal and marine management needs through spatial planning and concomitant seabed habitat mapping. Contrasting strategies are often evident in these processes among local, regional, national and international scientific approaches and policy needs. In answer to such contrasts among its member states, the United States Northeast Regional Ocean Council formed a Habitat Working Group to conduct a regional inventory and comparative evaluation of seabed characterization, classification, and modeling activities in New England. The goals of this effort were to advance regional understanding of ocean habitats and identify opportunities for collaboration. Working closely with the Habitat Working Group, we organized and led the inventory and comparative analysis with a focus on providing processes and tools that can be used by scientists and managers, updated and adapted for future use, and applied in other ocean management regions throughout the world. Visual schematics were a critical component of the comparative analysis and aided discussion among scientists and managers. Regional consensus was reached on a common habitat classification scheme (U.S. Coastal and Marine Ecological Classification Standard) for regional seabed maps. Results and schematics were presented at a region-wide workshop where further steps were taken to initiate collaboration among projects. The workshop culminated in an agreement on a set of future seabed mapping goals for the region. The work presented here may serve as an example to other ocean planning regions in the U.S., Europe or elsewhere seeking to integrate a variety of seabed characterization, classification and modeling activities.
City of Chicago Combined Work Plan and Summary Report for Loewenthal Metals
Summary of the work performed by the City’s Department of Fleet and Facility Management on behalf of the Chicago Department of Transportation (CDOT) to address elevated levels of lead in City right of way..
Software And Systems Engineering Risk Management
2010-04-01
RSKM 2004 COSO Enterprise RSKM Framework 2006 ISO/IEC 16085 Risk Management Process 2008 ISO/IEC 12207 Software Lifecycle Processes 2009 ISO/IEC...1 Software And Systems Engineering Risk Management John Walz VP Technical and Conferences Activities, IEEE Computer Society Vice-Chair Planning...Software & Systems Engineering Standards Committee, IEEE Computer Society US TAG to ISO TMB Risk Management Working Group Systems and Software
Pilaete, Karen; De Medts, Joris; Delsupehe, Kathelijne Godelieve
2014-05-01
Drug-induced sleep endoscopy (DISE) is a new tool in the work-up of patients with sleep-disordered breathing (SDB). We assessed the impact of DISE on the treatment plan of snoring patients. This is a single institution prospective longitudinal clinical trial. The setting is a private teaching hospital. A consecutive series of 100 snoring patients prospectively underwent a standardised questionnaire, clinical examination, rhinomanometry, allergy skin prick testing, DISE and polysomnography. Management plan before and after DISE evaluation was compared. In 61 patients (excluding 16 patients sent for continuous positive airway pressure, three patients refused sleep endoscopy and 20 were lost to follow-up), we compared the treatment plans. DISE showed single level airway collapse in 13 and multilevel collapse in 48 patients. The site of flutter did not add additional information as compared to the pattern and the location of the collapse. After DISE, the initial management plan changed in 41% of patients irrespective of the type of initial management plan. The only somewhat accurate initial treatment plan was uvulopalatopharyngoplasty (unchanged in 11/13 patients). Excluding moderate to severe obstructive sleep apnea patients DISE is an indispensable tool in treatment decision in all SDB patients. We suggest to simplify the protocol for DISE reporting.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 1 2012-07-01 2012-07-01 false Assessment work. 9.7 Section 9.7 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT Mining and Mining Claims § 9.7 Assessment work. (a) An access permit and approved plan of...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 1 2013-07-01 2013-07-01 false Assessment work. 9.7 Section 9.7 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT Mining and Mining Claims § 9.7 Assessment work. (a) An access permit and approved plan of...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 1 2014-07-01 2014-07-01 false Assessment work. 9.7 Section 9.7 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT Mining and Mining Claims § 9.7 Assessment work. (a) An access permit and approved plan of...
Visit from JAXA to NASA MSFC: The Engines Element & Ideas for Collaboration
NASA Technical Reports Server (NTRS)
Greene, William D.
2013-01-01
System Design, Development, and Fabrication: Design, develop, and fabricate or procure MB-60 component hardware compliant with the imposed technical requirements and in sufficient quantities to fulfill the overall MB-60 development effort. System Development, Assembly, and Test: Manage the scope of the development, assembly, and test-related activities for MB-60 development. This scope includes engine-level development planning, engine assembly and disassembly, test planning, engine testing, inspection, anomaly resolution, and development of necessary ground support equipment and special test equipment. System Integration: Provide coordinated integration in the realms of engineering, safety, quality, and manufacturing disciplines across the scope of the MB-60 design and associated products development Safety and Mission Assurance, structural design, fracture control, materials and processes, thermal analysis. Systems Engineering and Analysis: Manage and perform Systems Engineering and Analysis to provide rigor and structure to the overall design and development effort for the MB-60. Milestone reviews, requirements management, system analysis, program management support Program Management: Manage, plan, and coordinate the activities across all portions of the MB-60 work scope by providing direction for program administration, business management, and supplier management.
Assessing climate change-robustness of protected area management plans—The case of Germany
Geyer, Juliane; Kreft, Stefan; Jeltsch, Florian; Ibisch, Pierre L.
2017-01-01
Protected areas are arguably the most important instrument of biodiversity conservation. To keep them fit under climate change, their management needs to be adapted to address related direct and indirect changes. In our study we focus on the adaptation of conservation management planning, evaluating management plans of 60 protected areas throughout Germany with regard to their climate change-robustness. First, climate change-robust conservation management was defined using 11 principles and 44 criteria, which followed an approach similar to sustainability standards. We then evaluated the performance of individual management plans concerning the climate change-robustness framework. We found that climate change-robustness of protected areas hardly exceeded 50 percent of the potential performance, with most plans ranking in the lower quarter. Most Natura 2000 protected areas, established under conservation legislation of the European Union, belong to the sites with especially poor performance, with lower values in smaller areas. In general, the individual principles showed very different rates of accordance with our principles, but similarly low intensity. Principles with generally higher performance values included holistic knowledge management, public accountability and acceptance as well as systemic and strategic coherence. Deficiencies were connected to dealing with the future and uncertainty. Lastly, we recommended the presented principles and criteria as essential guideposts that can be used as a checklist for working towards more climate change-robust planning. PMID:28982187
Special Issue: Competencies from the Individual's Viewpoint.
ERIC Educational Resources Information Center
Career Planning and Adult Development Journal, 2003
2003-01-01
Ten articles in this special issue deal with competencies and how their use is revolutionizing human resource management and the work of career practitioners. Topics include competency technology, models, and mapping; behavioral interviewing; talent management; emotional intelligence; succession planning; and lifelong learning. (JOW)
A Loblolly Pine Management Guide: Managing Site Damage from Logging
W.H. McKee; G.E. Hatchell; A.E. Tiarks
1985-01-01
Serious damage to forest sites during logging can be avoided through careful planning of logging, preparation of the site for logging, and close supervision of the work.Losses in productivity caused by compaction can be largely restored by cultivation and fertilization.
NASA Technical Reports Server (NTRS)
Simon, Tom
2009-01-01
To effectively manage a project, the project manager must have a plan, understand the current conditions, and be able to take action to correct the course when challenges arise. Research and design projects face technical, schedule, and budget challenges that make it difficult to utilize project management tools developed for projects based on previously demonstrated technologies. Projects developing new technologies by their inherent nature are trying something new and thus have little to no data to support estimates for schedule and cost, let alone the technical outcome. Projects with a vision for the outcome but little confidence in the exact tasks to accomplish in order to achieve the vision incur cost and schedule penalties when conceptual solutions require unexpected iterations or even a reinvention of the plan. This presentation will share the project management methodology and tools developed through trial and error for a NASA research and design project combining industry, academia, and NASA inhouse work in which Earned Value Management principles were employed but adapted for the reality of the government financial system and the reality of challenging technology development. The priorities of the presented methodology are flexibility, accountability, and simplicity to give the manager tools to help deliver to the customer while not using up valuable time and resources on extensive planning and analysis. This presentation will share the methodology, tools, and work through failed and successful examples from the three years of process evolution.
40 CFR 35.917 - Facilities planning (step 1).
Code of Federal Regulations, 2010 CFR
2010-07-01
... projection totals and disaggregations in approved water quality management (WQM) plans. (See paragraph 8a(3... the most economical means of meeting established effluent and water quality goals while recognizing... WQM work program, or that award of the grant is necessary to achieve water quality goals of the Act...
40 CFR 35.917 - Facilities planning (step 1).
Code of Federal Regulations, 2011 CFR
2011-07-01
... projection totals and disaggregations in approved water quality management (WQM) plans. (See paragraph 8a(3... the most economical means of meeting established effluent and water quality goals while recognizing... WQM work program, or that award of the grant is necessary to achieve water quality goals of the Act...
The Implications of Service-Learning for Technology Studies.
ERIC Educational Resources Information Center
Folkestad, James E.; Senior, Bolivar A.; DeMirana, Michael A.
2002-01-01
A "toys for tots" service-learning experience integrated into an industrial technology management course required development and planning using a process planning and costing model and work with a variety of stakeholders including an Even-Start learning center. Challenges include the lack of service-learning precedent in technology studies and…
Changing Conceptions of Employee Compensation
ERIC Educational Resources Information Center
Dixon, Mark R.; Hayes, Linda J.
2004-01-01
This paper reviews and discusses many differing forms of incentive compensation systems that are being used in today's organizations. The review traces the roots of bonus compensation from individual piece-work plans through the adoption of organization-wide gain sharing plans to the growing recognition of open-book management. Reasons for the…
Aqua/Aura Inclination Adjust Maneuver Series Spring 2018 Planning
NASA Technical Reports Server (NTRS)
Trenholme, Elena; Boone, Spencer
2017-01-01
This will be presented at the International Earth Science Constellation Mission Operations Working Group meeting on December 6-8, 2017 to discuss the Aqua/Aura Spring 2018 Inclination Adjust Maneuver series planning. Presentation has been reviewed and approved by Eric Moyer, ESMO (Earth Science Mission Operations) Deputy Project Manager.
ERIC Educational Resources Information Center
Green, Stephen; And Others
This final report is a product of a Preservation Planning Program (PPP) self-study conducted by the Colorado State University Library (CSUL) working with the Association of Research Libraries' (ARL) Office of Management Studies (OMS). Designed to put self-help tools into the hands of library staff responsible for developing plans and procedures…
NASA Astrophysics Data System (ADS)
Bravo-Torija, Beatriz; Jiménez-Aleixandre, María-Pilar
2012-01-01
Sustainable management of marine resources raises great challenges. Working with this socio-scientific issue in the classroom requires students to apply complex models about energy flow and trophic pyramids in order to understand that food chains represent transfer of energy, to construct meanings for sustainable resources management through discourse, and to connect them to actions and decisions in a real-life context. In this paper we examine the process of elaboration of plans for resources management in a marine ecosystem by 10th grade students (15-16 year) in the context of solving an authentic task. A complete class ( N = 14) worked in a sequence about ecosystems. Working in small groups, the students made models of energy flow and trophic pyramids, and used them to solve the problem of feeding a small community for a long time. Data collection included videotaping and audiotaping of all of the sessions, and collecting the students' written productions. The research objective is to examine the process of designing a plan for sustainable resources management in terms of the discursive moves of the students across stages in contextualizing practices, or different degrees of complexity (Jiménez-Aleixandre & Reigosa International Journal of Science Education, 14(1): 51-61 2006), understood as transformations from theoretical statements to decisions about the plan. The analysis of students' discursive moves shows how the groups progressed through stages of connecting different models, between them and with the context, in order to solve the task. The challenges related to taking this sustainability issue to the classroom are discussed.
Flexiyear Schedules in Germany.
ERIC Educational Resources Information Center
Teriet, Bernhard
1982-01-01
Describes a German experiment whereby fulltime employees can work fewer hours without losing status and parttime employees have more options on allocations of working hours. The process ensures that management can count on enough staff for peak periods and more easily plan ahead. (JOW)
Evaluation of work zone enhancement software programs.
DOT National Transportation Integrated Search
2009-09-01
The Missouri Department of Transportation (MoDOT) is looking for software tools that can assist in : developing effective plans to manage and communicate work zone activities. QuickZone, CA4PRS, : VISSIM, and Spreadsheet models are the tools that MoD...
Simplified web-based decision support method for traffic management and work zone analysis.
DOT National Transportation Integrated Search
2017-01-01
Traffic congestion mitigation is one of the key challenges that transportation planners and operations engineers face when planning for construction and maintenance activities. There is a wide variety of approaches and methods that address work zone ...
Simplified web-based decision support method for traffic management and work zone analysis.
DOT National Transportation Integrated Search
2015-06-01
Traffic congestion mitigation is one of the key challenges that transportation planners and operations engineers face when : planning for construction and maintenance activities. There is a wide variety of approaches and methods that address work : z...
WastePlan model implementation for New York State. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Visalli, J.R.; Blackman, D.A.
1995-07-01
WastePlan is a computer software tool that models solid waste quantities, costs, and other parameters on a regional basis. The software was developed by the Tellus Institute, a nonprofit research and consulting firm. The project`s objective was to provide local solid waste management planners in New York State responsible to develop and implement comprehensive solid waste management plans authorized by the Solid Waste Management Act of 1988, with a WastePlan model specifically tailored to fit the demographic and other characteristics of New York State and to provide training and technical support to the users. Two-day workshops were held in 1992more » to introduce planners to the existing versions; subsequently, extensive changes were made to the model and a second set of two-day workshops were held in 1993 to introduce planners to the enhanced version of WastePlan. Following user evaluations, WastePlan was further modified to allow users to model systems using a simplified version, and to incorporate report forms required by New York State. A post-project survey of trainees revealed limited regular use of software. Possible reasons include lack of synchronicity with NYSDEC planning process; lack of computer literacy and aptitude among trainees; hardware limitations; software user-friendliness; and the work environment of the trainees. A number of recommendations are made to encourage use of WastePlan by local solid waste management planners.« less
Hospital culture--why create one?
Sovie, M D
1993-01-01
Hospitals, to survive, must be transformed into responsive, participative organizations capable of new practices that produce improved results in both quality of care and service at reduced costs. Creating, managing, and changing the culture are critical leadership functions that will enable the hospital to succeed. Strategic planning and effective implementation of planned change will produce the desired culture. Work restructuring, a focus on quality management along with changes in clinical practices, as well as the care and support processes, are all a part of the necessary hospital cultural revolution.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kain, Jaan-Henrik; Soederberg, Henriette
2008-01-15
The vision of sustainable development entails new and complex planning situations, confronting local policy makers with changing political conditions, different content in decision making and planning and new working methods. Moreover, the call for sustainable development has been a major driving force towards an increasingly multi-stakeholder planning system. This situation requires competence in working in, and managing, groups of actors, including not only experts and project owners but also other categories of stakeholders. Among other qualities, such competence requires a working strategy aimed at integrating various, and sometimes incommensurable, forms of knowledge to construct a relevant and valid knowledge basemore » prior to decision making. Consequently, there lies great potential in methods that facilitate the evaluation of strategies for infrastructural development across multiple knowledge areas, so-called multi-criteria decision aids (MCDAs). In the present article, observations from six case studies are discussed, where the common denominators are infrastructural planning, multi-stakeholder participation and the use of MCDAs as interactive decision support. Three MCDAs are discussed - NAIADE, SCA and STRAD - with an emphasis on how they function in their procedural context. Accordingly, this is not an analysis of MCDA algorithms, of software programming aspects or of MCDAs as context-independent 'decision machines'-the focus is on MCDAs as actor systems, not as expert systems. The analysis is carried out across four main themes: (a) symmetrical management of different forms of knowledge; (b) management of heterogeneity, pluralism and conflict; (c) functionality and ease of use; and (d) transparency and trust. It shows that STRAD, by far, seems to be the most useful MCDA in interactive settings. NAIADE and SCA are roughly equivalent but have their strengths and weaknesses in different areas. Moreover, it was found that some MCDA issues require further attention, i.e., regarding transparency and understandability; qualitative/quantitative knowledge input; switching between different modes of weighting; software flexibility; as well as graphic and user interfaces.« less
Microgravity strategic planning exercise
NASA Technical Reports Server (NTRS)
Halpern, Richard; Downey, Jim; Harvey, Harold
1991-01-01
The Center for Space and Advanced Technology supported a planning exercise for the Microgravity Program management at the Marshall Space Flight Center. The effort focused on the status of microgravity work at MSFC and elsewhere with the objective of preparing a goal-oriented strategic planning document which could be used for informational/brochure purposes. The effort entailed numerous interactions and presentations with Field Center programmatic components and Headquarters personnel. Appropriate material was consolidated in a draft format for a MSFC Strategic Plan.
NASA Technical Reports Server (NTRS)
Balaban, Edward; Orosz, Michael; Kichkaylo, Tatiana; Goforth, Andre; Sweet, Adam; Neches, Robert
2006-01-01
Few human endeavors present as much of a planning and scheduling challenge as space flight, particularly manned space flight. Just on the operational side of it, efforts of thousands of people across hundreds of organizations need to be coordinated. Numerous tasks of varying complexity and nature, from scientific to construction, need to be accomplished within limited mission time frames. Resources need to be carefully managed and contingencies worked out, often on a very short notice. From the beginning of the NASA space program, planning has been done by large teams of domain experts working months, sometimes years, to put together a single mission. This approach, while proven very reliable up to now, is becoming increasingly harder to sustain. Elevated levels of NASA space activities, from deployment of the new Crew Exploration Vehicle (CEV) and completion of the International Space Station (ISS), to the planned lunar missions and permanent lunar bases, will put an even greater strain on this largely manual process. While several attempts to automate it have been made in the past, none have fully succeeded. In this paper we describe the current NASA planning methods, outline their advantages and disadvantages, discuss the planning challenges of upcoming missions and propose a distributed planning/scheduling framework (CMMD) aimed at unifying and optimizing the planning effort. CMMD will not attempt to make the process completely automated, but rather serve in a decision support capacity for human managers and planners. It will help manage information gathering, creation of partial and consolidated schedules, inter-team negotiations, contingencies investigation, and rapid re-planning when the situation demands it. The fist area of CMMD application will be planning for Extravehicular Activities (EVA) and associated logistics. Other potential applications, not only in the space flight domain, and future research efforts will be discussed as well.
Management Study of the Office of the Secretary of Defense.
1987-10-01
work . If DoD is unable to acquire an individual with similar broad experience in both the C3 and Intelligence areas, consideration should be given to...ORGANIZATION (If applicable) N/A N/A 8c. ADDRESS (City, State, and ZIP Code) 10. SOURCE OF FUNDING NUMBERS PROGRAM N PROJECT TASK WORK UNIT ELMN...political-military assinumptions, apd improve civilian control over operations planning. Concerns about the sensitivity of the plans should be balanced
The space shuttle payload planning working groups. Volume 3: High energy astrophysics
NASA Technical Reports Server (NTRS)
1973-01-01
The findings of the High Energy Astrophysics working group of the space shuttle payload planning activity are presented. The objectives to be accomplished during space shuttle missions are defined as: (1) X-ray astronomy, (2) hard X-ray and gamma ray astronomy, and (3) cosmic ray astronomy. The instruments and test equipment required to accomplish the mission are identified. Recommendations for managing the installation of the equipment and conducting the missions are included.
Effective managed care marketing strategies for evolving markets.
Conlon, M K
1997-11-01
In a world of increased competition and changing consumer expectations, one of the keys to a fiscally sound health plan is having a dynamic marketing strategy that takes into account the shifting attitudes of consumers as managed care markets mature. The primary goal of any health plan marketing strategy should be the acquisition and retention of members. Providing cost-efficient and convenient service for enrollees, offering low or no deductibles, having convenient office locations, and minimizing paper-work are important elements of such a marketing strategy. Factors such as brand awareness and the perceived image of a health plan also are important considerations in acquiring and retaining market share. The relative importance of these consumer satisfaction criteria change as a managed care market evolves and matures. Financial and marketing managers, thus, should ascertain their market's stage of development and respond with appropriate marketing strategies.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tyrrell, Evan; Denny, Angelita
Fifty-two groundwater samples and one surface water sample were collected at the Monument Valley, Arizona, Processing Site to monitor groundwater contaminants for evaluating the effectiveness of the proposed compliance strategy as specified in the 1999 Final Site Observational Work Plan for the UMTRA Project Site at Monument Valley, Arizona. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and-analysis-plan-us-department- energy-office-legacy-management-sites). Samples were collected for metals, anions, nitrate + nitrite as N, and ammonia as N analyses at all locations.
Case Management and Rehabilitation Counseling: Procedures and Techniques. Fourth Edition
ERIC Educational Resources Information Center
Roessler, Richard T.; Rubin, Stanford E.
2006-01-01
"Case Management and Rehabilitation Counseling" discusses procedures that are useful to rehabilitation professionals working in many settings. Specifically, this book reviews the finer points relating to diagnosing, arranging services, monitoring program outcomes, arranging for placement, planning for accommodations, ethical decision making,…
SOS: A Time Management Framework.
ERIC Educational Resources Information Center
Rees, Ruth
1986-01-01
Proposes a time management framework for those working within social service institutions such as schools. Explains three sequential and interdependent groups of recommendations: (1) self-awareness and self-discipline; (2) organizational awareness and a synchronization of both the institution and the individual; and (3) planning, timetabling,…
78 FR 62587 - New England Fishery Management Council; Public Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-22
... prepare a work plan regarding how the New England Fishery Management Council (Council) may proceed in... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration RIN 0648-XC923 New England... Oceanic and Atmospheric Administration (NOAA), Commerce. ACTION: Notice; public meeting. SUMMARY: The New...
results, and working closely with industry and DOE serving as a Project Leader and a Principal Investigator Management of reporting requirements to DOE for financial forecasts, milestone reports, and annual operating plans Management of communications projects for the NREL Biomass program and Bioenergy
Analysis of post-mining excavations as places for municipal waste
NASA Astrophysics Data System (ADS)
Górniak-Zimroz, Justyna
2018-01-01
Waste management planning is an interdisciplinary task covering a wide range of issues including costs, legal requirements, spatial planning, environmental protection, geography, demographics, and techniques used in collecting, transporting, processing and disposing of waste. Designing and analyzing this issue is difficult and requires the use of advanced analysis methods and tools available in GIS geographic information systems containing readily available graphical and descriptive databases, data analysis tools providing expert decision support while selecting the best-designed alternative, and simulation models that allow the user to simulate many variants of waste management together with graphical visualization of the results of performed analyzes. As part of the research study, there have been works undertaken concerning the use of multi-criteria data analysis in waste management in areas located in southwestern Poland. These works have proposed the inclusion in waste management of post-mining excavations as places for the final or temporary collection of waste assessed in terms of their suitability with the tools available in GIS systems.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-06
... Experimental and Management Plan for the Operation of Glen Canyon Dam AGENCY: Bureau of Reclamation and... Interior (Secretary) Ken Salazar announced that the development of a Long-Term Experimental and Management... GCDAMP includes a Federal advisory committee known as the Glen Canyon Dam Adaptive Management Work Group...
Community views of fuels management: are national forest local recreation users more supportive?
Christine Vogt; Greg Winter; Sarah McCaffrey
2007-01-01
Significant advances in social science-based wildfire research have occurred in the past five years. Managers, policy makers, and researchers have worked to better understand the perspectives of homeowners, residents, tourists, and recreationists on fire and fuels management and how to better involve them in the planning process. This research examines how the...
Using action research to plan a violence prevention program for emergency departments.
Gates, Donna; Gillespie, Gordon; Smith, Carolyn; Rode, Jennifer; Kowalenko, Terry; Smith, Barbara
2011-01-01
Although there are numerous studies that show that emergency department (ED) violence is a prevalent and serious problem for healthcare workers, there is a lack of published evaluations of interventions aimed at reducing this alarming trend. Using an action research model, the authors partnered with six hospitals to plan, implement and evaluate a violence prevention and management intervention. Phase one of this project involved gathering information from employees, managers and patients using focus groups. Ninety-seven persons participated in one of twelve focus groups. The Haddon matrix was used to develop focus group questions aimed at gathering data about the pre-assault, during assault, and post-assault time frames and to compare these findings to planned strategies. Analysis consisted of identification of themes related to intervention strategies for patients/visitors, employees, managers, and the work environment. Thematic analysis results supported the relevance, feasibility, and saliency of the planned intervention strategies. With the exception of a few items, employees and managers from the different occupational groups agreed on the interventions needed to prevent and manage violence against ED workers. Patients focused on improved staff communication and comfort measures. Results support that violence in the emergency department is increasing, that violence is a major concern for those who work in and visit emergency departments, and that interventions are needed to reduce workplace violence. The Haddon matrix along with an action research method was useful to identify intervention strategies most likely to be successfully implemented and sustained by the emergency departments. Copyright © 2011 Emergency Nurses Association. Published by Mosby, Inc. All rights reserved.
NASA Astrophysics Data System (ADS)
Johnson, G.; Springer, A. E.; Misztal, L.; Grabau, M.
2017-12-01
Climate changes in the arid Southwest are expected to further stress critical water sources, such as springs, in the near future. Springs are abundant features in the Southwest, providing habitat for listed species and water for wildlife, agricultural, cities, recreation, and the base flow for many rivers. But springs occupy a small fraction of the land area and, as a result, they have not been significantly studied or mapped. Managers recognize that effective stewardship of these critical resources requires a landscape-scale understanding of distribution, ecological integrity, and risks; access to comprehensive inventory, assessment and restoration protocols; and local implementation. They need easy access to information at varying scales to respond to stressors like climate change. The Desert Landscape Conservation Cooperative, Sky Island Alliance, and Springs Stewardship Institute worked with scientists, resource managers, and conservationists to develop and increase access to data by involving them in the entire research process through field surveys, workshops, trainings, and development of products needed to solve critical management challenges. We built on and connected existing efforts underway in the Southwest, including developing: 1) Springs Inventory Protocol, 2) an online geospatial database, 3) methodologies for climate-savvy monitoring and 4) a springs restoration handbook. We also worked with partners to evaluate the condition and risk of springs' resources at the local scale to create products used in site-specific management planning. Our results indicate that coproduction resulted in more understanding of common issues, more focus on solving management challenges, and increased use of the science and protocols produced. Information developed through this project assists managers in understanding how their springs contribute at local and landscape scales. New information developed through this project is being used in support of planning and decisions that address resource protection at the regional level and in climate change adaptation planning for natural resources. This work highlights the need to increase collaboration and coproduction of information tailored for management issues at different spatial and temporal scales.
Feasibility of lane closures using probe data : technical brief.
DOT National Transportation Integrated Search
2017-04-01
This study developed an on-line system analysis tool called the Work Zone Interactive : Management Application - Planning (WIMAP-P), an easy-to-use and easy-to-learn tool for : predicting the traffic impact caused by work zone lane closures on freewa...
Hybrid Program Design: What Works for Adult Learners in a Professional Degree Program?
ERIC Educational Resources Information Center
Stevens, Christine Rowader
2017-01-01
Working adults planning to pursue higher education programs to advance their careers often face conflicting demands. Colleges and universities are challenged to offer non-traditional programs with more scheduling flexibility, allowing adult learners to manage multiple work, family, and other obligations while attending school (Dana, 2013;…
Code of Federal Regulations, 2013 CFR
2013-07-01
... activities otherwise authorized, may receive monies from cooperators only for cooperative work in forest... work as planning, analysis, and related studies, as well as resource activities. (b) Reimbursements. Agency expenditures for work undertaken in accordance with this section may be made from Forest Service...
Villaflores: Municipal forest fire management model
Pedro Martínez Muñoz; Carlos Alberto Velázquez Sanabria
2013-01-01
As provided for in the General Law on Sustainable Forestry Development, the Municipality of Villaflores has worked on a continuous basis since 2002 to reduce the damage caused by forest fires as part of its working agenda, in conjunction with Federal and State agencies and NGOs. The work plan has the following phases: a) Inter-agency coordination:...
Improving supervision: a team approach.
1993-01-01
This issue of "The Family Planning Manager" outlines an interactive team supervision strategy as a means of improving family planning service quality and enabling staff to perform to their maximum potential. Such an approach to supervision requires a shift from a monitoring to a facilitative role. Because supervisory visits to the field are infrequent, the regional supervisor, clinic manager, and staff should form a team to share ongoing supervisory responsibilities. The team approach removes individual blame and builds consensus. An effective team is characterized by shared leadership roles, concrete work problems, mutual accountability, an emphasis on achieving team objectives, and problem resolution within the group. The team supervision process includes the following steps: prepare a visit plan and schedule; meet with the clinic manager and staff to explain how the visit will be conducted; supervise key activity areas (clinical, management, and personnel); conduct a problem-solving team meeting; conduct a debriefing meeting with the clinic manager; and prepare a report on the visit, including recommendations and follow-up plans. In Guatemala's Family Planning Unit, teams identify problem areas on the basis of agreement that a problem exists, belief that the problem can be solved with available resources, and individual willingness to accept responsibility for the specific actions identified to correct the problem.
Earthworks logistics in the high density urban development conditions - case study
NASA Astrophysics Data System (ADS)
Sobotka, A.; Blajer, M.
2017-10-01
Realisation of the construction projects on highly urbanised areas carries many difficulties and logistic problems. Earthworks conducted in such conditions constitute a good example of how important it is to properly plan the works and use the technical means of the logistics infrastructure. The construction processes on the observed construction site, in combination with their external logistics service are a complex system, difficult for mathematical modelling and achievement of appropriate data for planning the works. The paper shows describe and analysis of earthworks during construction of the Centre of Power Engineering of AGH in Krakow for two stages of a construction project. At the planning stage in the preparatory phase (before realization) and in the implementation phase of construction works (foundation). In the first case, an example of the use of queuing theory for prediction of excavation time under random work conditions of the excavator and the associated trucks is provided. In the second case there is a change of foundation works technology resulting as a consequence of changes in logistics earthworks. Observation of the construction has confirmed that the use of appropriate methods of construction works management, and in this case agile management, the time and cost of the project have not been exceeded. The success of a project depends on the ability of the contractor to react quickly when changes occur in the design, technology, environment, etc.
Scenario Planning Provides a Framework for Climate Change Adaptation in the National Park Service
NASA Astrophysics Data System (ADS)
Welling, L. A.
2012-12-01
Resource management decisions must be based on future expectations. Abundant evidence suggests climate change will have highly consequential effects on the Nation's natural and cultural resources, but specific impacts are difficult to accurately predict. This situation of too much information but not enough specificity can often lead to either paralysis or denial for decision makers. Scenario planning is an emerging tool for climate change adaptation that provides a structured framework for identifying and exploring critical drivers of change and their uncertain outcomes. Since 2007, the National Park Service (NPS) has been working with its partners to develop and apply a scenario-based approach for adaptation planning that integrates quantitative, model-driven, climate change projections with qualitative, participatory exercises to explore management and policy options under a range of future conditions. Major outcomes of this work are (1) increased understanding of key scientific results and uncertainties, (2) incorporation of alternative perspectives into park and landscape level planning, (3) identification of "no brainer" and "no gainer" actions, (4) strengthening of regional science-management partnerships, and (5) overall improved capacity for flexible decision making. The basic approach employed by NPS for scenario planning follows a typical adaptive management process: define the focal question, assess the relevant science, explore plausible futures, identify effective strategies, prioritize and implement actions, and monitor results. Many science and management partners contributed to the process, including NOAA Regional Integrated Science and Assessment teams (RISAs) and Regional Climate Centers (RCCs), USGS Research Centers, and other university and government scientists. The Global Business Network, an internationally recognized leader in scenario development, provided expert facilitation and training techniques. Climate science input is provided through global and regional circulation models and downscaling to arrive at climate driver information that is relevant for parks and the landscapes within which they are found. Considerable effort is necessary to synthesize the information and to effectively communicate uncertainties about both values and trend (e.g. scientists have higher confidence in the trend of temperature over a given time period than the value). Drivers that are determined to be highly consequential and uncertain are used to create management-relevant scenarios using various techniques, including a structured 2X2 matrix approach, a succession of rapid combinations using multiple variables, and the development of a base, "least change" scenario from which alternatives are then constructed. Socio-economic factors are also considered as essential factors that define the full decision environment within which management and policy decisions are made. Resulting scenarios incorporate information about impacts to natural and cultural resources as well as facilities and visitor experience. The NPS conducted prototypes for scenario planning in each of seven regions and has begun to incorporate elements of the process into all planning requirements. A significant outcome of this work is managers and scientists alike understand climate and ecosystem models provide tools for exploring the future rather than predicting it.
Violence prevention at work. A business perspective.
Wilkinson, C W
2001-02-01
The risk of workplace violence varies depending on the type and location of the business. Business managers should assess violence risk and develop a program based on the level of risk faced by their employees. This assessment should include: (1) a review of workplace security and identification of positions with increased risk of exposure to violence, (2) risk reduction through environmental design and employee training, (3) development of a plan and identification of professional resources to respond to incidents should they occur, and (4) communication of the employer's commitment to providing a safe work environment for employees. For most businesses, threat assessment and management comprise the cornerstone of a workplace violence-prevention program. Planning and preparation are key to workplace violence prevention.
Time management tips, tricks, and exercises for busy medical practice employees.
Hills, Laura
2012-01-01
Working in a busy medical practice requires excellent time management skills and an ability to handle those unanticipated emergencies, urgencies, and monkey-wrenches that can and often do throw a well-planned day out of whack. This article offers busy medical practice employees 50 time management tips to help them manage their time well. It focuses specifically on eliminating time wasters, working more efficiently, and developing personal goals and habits that can increase productivity, reduce stress, and make working in the practice more enjoyable. This article also offers several hands-on time management exercises, including a time management self-assessment quiz, a multitasking exercise, and a time drain exercise. These can be completed individually or collaboratively with other members of the medical practice team. Finally, this article explores 12 popular time management myths and how a medical practice employee can increase his or her productivity by identifying and harnessing his or her productivity "happy hour(s)".
ERIC Educational Resources Information Center
Inegbedion, Juliet Obhajajie
2017-01-01
The quality of the programmes and courses in ODL depends on the academics that plan the programmes, develop the curriculum, manage courses and programmes and carry out administrative duties. It is observed that the academics often complain of work overload. It also appears there is a mix-up in integrating the mode of planning workload in the…
78 FR 19522 - Notice of Public Meeting, Northwest Colorado Resource Advisory Council
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-01
... White River Field Office, 220 E. Market St., Meeker, CO. FOR FURTHER INFORMATION CONTACT: David Boyd... the BLM National Sage Grouse Conservation Strategy, working group reports, recreation, fire management... National Conservation Area, Kremmling Resource Management Plan revision and the White River Field Office...
Manager's assistant systems for space system planning
NASA Technical Reports Server (NTRS)
Bewley, William L.; Burnard, Robert; Edwards, Gary E.; Shoop, James
1992-01-01
This paper describes a class of knowledge-based 'assistant' systems for space system planning. Derived from technology produced for the DARPA/USAF Pilot's Associate program, these assistant systems help the human planner by doing the bookkeeping to maintain plan data and executing the procedures and heuristics currently used by the human planner to define, assess, diagnose, and revise plans. Intelligent systems for Space Station Freedom assembly sequence planning and Advanced Launch System modeling will be presented as examples. Ongoing NASA-funded work on a framework supporting the development of such tools will also be described.
EOS Laser Atmosphere Wind Sounder (LAWS) investigation
NASA Technical Reports Server (NTRS)
Emmitt, George D.
1991-01-01
The related activities of the contract are outlined for the first year. These include: (1) attend team member meetings; (2) support EOS Project with science related activities; (3) prepare and Execution Phase plan; and (4) support LAWS and EOSDIS related work. Attached to the report is an appendix, 'LAWS Algorithm Development and Evaluation Laboratory (LADEL)'. Also attached is a copy of a proposal to the NASA EOS for 'LAWS Sampling Strategies and Wind Computation Algorithms -- Storm-Top Divergence Studies. Volume I: Investigation and Technical Plan, Data Plan, Computer Facilities Plan, Management Plan.'
NASA Technical Reports Server (NTRS)
Klock, P.; Evans, D.
1979-01-01
The Executive Summary and Proceedings of the Working Group Meeting was analyzed to identify specific projects appropriate for Distribution Automation and Control DAC RD&D. Specific projects that should be undertaken in the DAC RD&D program were recommended. The projects are presented under broad categories of work selected based on ESC's interpretation of the results of the Working Group Meeting. Some of the projects are noted as utility industry projects. The ESC recommendations regarding program management are presented. Utility versus Government management responsibilities are noted.
Preservation Planning Project Study Team. Final Report.
ERIC Educational Resources Information Center
Pittsburgh Univ., PA. Libraries.
This final report is a product of a comprehensive 14-month Preservation Planning Program (PPP) self-study conducted by the University of Pittsburgh Libraries, working with the Association of Research Libraries' (ARL) Office of Management Studies. The PPP is designed to put self-help tools into the hands of library staff responsible for developing…
Yu, Huan; Ni, Shi-Jun; Kong, Bo; He, Zheng-Wei; Zhang, Cheng-Jiang; Zhang, Shu-Qing; Pan, Xin; Xia, Chao-Xu; Li, Xuan-Qiong
2013-01-01
Land-use planning has triggered debates on social and environmental values, in which two key questions will be faced: one is how to see different planning simulation results instantaneously and apply the results back to interactively assist planning work; the other is how to ensure that the planning simulation result is scientific and accurate. To answer these questions, the objective of this paper is to analyze whether and how a bridge can be built between qualitative and quantitative approaches for land-use planning work and to find out a way to overcome the gap that exists between the ability to construct computer simulation models to aid integrated land-use plan making and the demand for them by planning professionals. The study presented a theoretical framework of land-use planning based on scenario analysis (SA) method and multiagent system (MAS) simulation integration and selected freshwater wetlands in the Sanjiang Plain of China as a case study area. Study results showed that MAS simulation technique emphasizing quantitative process effectively compensated for the SA method emphasizing qualitative process, which realized the organic combination of qualitative and quantitative land-use planning work, and then provided a new idea and method for the land-use planning and sustainable managements of land resources.
Ni, Shi-Jun; He, Zheng-Wei; Zhang, Cheng-Jiang; Zhang, Shu-Qing; Pan, Xin; Xia, Chao-Xu; Li, Xuan-Qiong
2013-01-01
Land-use planning has triggered debates on social and environmental values, in which two key questions will be faced: one is how to see different planning simulation results instantaneously and apply the results back to interactively assist planning work; the other is how to ensure that the planning simulation result is scientific and accurate. To answer these questions, the objective of this paper is to analyze whether and how a bridge can be built between qualitative and quantitative approaches for land-use planning work and to find out a way to overcome the gap that exists between the ability to construct computer simulation models to aid integrated land-use plan making and the demand for them by planning professionals. The study presented a theoretical framework of land-use planning based on scenario analysis (SA) method and multiagent system (MAS) simulation integration and selected freshwater wetlands in the Sanjiang Plain of China as a case study area. Study results showed that MAS simulation technique emphasizing quantitative process effectively compensated for the SA method emphasizing qualitative process, which realized the organic combination of qualitative and quantitative land-use planning work, and then provided a new idea and method for the land-use planning and sustainable managements of land resources. PMID:23818816
Development and demonstration of an on-board mission planner for helicopters
NASA Technical Reports Server (NTRS)
Deutsch, Owen L.; Desai, Mukund
1988-01-01
Mission management tasks can be distributed within a planning hierarchy, where each level of the hierarchy addresses a scope of action, and associated time scale or planning horizon, and requirements for plan generation response time. The current work is focused on the far-field planning subproblem, with a scope and planning horizon encompassing the entire mission and with a response time required to be about two minutes. The far-feld planning problem is posed as a constrained optimization problem and algorithms and structural organizations are proposed for the solution. Algorithms are implemented in a developmental environment, and performance is assessed with respect to optimality and feasibility for the intended application and in comparison with alternative algorithms. This is done for the three major components of far-field planning: goal planning, waypoint path planning, and timeline management. It appears feasible to meet performance requirements on a 10 Mips flyable processor (dedicated to far-field planning) using a heuristically-guided simulated annealing technique for the goal planner, a modified A* search for the waypoint path planner, and a speed scheduling technique developed for this project.
Spent nuclear fuel project high-level information management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Main, G.C.
1996-09-13
This document presents the results of the Spent Nuclear Fuel Project (SNFP) Information Management Planning Project (IMPP), a short-term project that identified information management (IM) issues and opportunities within the SNFP and outlined a high-level plan to address them. This high-level plan for the SNMFP IM focuses on specific examples from within the SNFP. The plan`s recommendations can be characterized in several ways. Some recommendations address specific challenges that the SNFP faces. Others form the basis for making smooth transitions in several important IM areas. Still others identify areas where further study and planning are indicated. The team`s knowledge ofmore » developments in the IM industry and at the Hanford Site were crucial in deciding where to recommend that the SNFP act and where they should wait for Site plans to be made. Because of the fast pace of the SNFP and demands on SNFP staff, input and interaction were primarily between the IMPP team and members of the SNFP Information Management Steering Committee (IMSC). Key input to the IMPP came from a workshop where IMSC members and their delegates developed a set of draft IM principles. These principles, described in Section 2, became the foundation for the recommendations found in the transition plan outlined in Section 5. Availability of SNFP staff was limited, so project documents were used as a basis for much of the work. The team, realizing that the status of the project and the environment are continually changing, tried to keep abreast of major developments since those documents were generated. To the extent possible, the information contained in this document is current as of the end of fiscal year (FY) 1995. Programs and organizations on the Hanford Site as a whole are trying to maximize their return on IM investments. They are coordinating IM activities and trying to leverage existing capabilities. However, the SNFP cannot just rely on Sitewide activities to meet its IM requirements. While the SNFP can use some work done Sitewide and by projects such as the Tank Waste Remediation System (TWRS), they will still need to make some IM investments of their own.« less
da Silva, Vania Eugênia; Mafra, Simone Caldas Tavares; Mafra, Cláudio Lísias; de Souza, Amaury Paulo
2012-01-01
This study looked for to lift information regarding laundries inserted in industries of animal products origin, to understand the activities developed in the section and to structure a Manual of Planning and Technical Information for laundries to industries of animal products origin, with the intention of subsidizing the planning, structuring and control of this work place, because norms or regulations that supervise don't exist or aid their managers and workers as for the operation of this work place.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nutt, M.; Nuclear Engineering Division
2010-05-25
The activity of Phase I of the Waste Management Working Group under the United States - Japan Joint Nuclear Energy Action Plan started in 2007. The US-Japan JNEAP is a bilateral collaborative framework to support the global implementation of safe, secure, and sustainable, nuclear fuel cycles (referred to in this document as fuel cycles). The Waste Management Working Group was established by strong interest of both parties, which arise from the recognition that development and optimization of waste management and disposal system(s) are central issues of the present and future nuclear fuel cycles. This report summarizes the activity of themore » Waste Management Working Group that focused on consolidation of the existing technical basis between the U.S. and Japan and the joint development of a plan for future collaborative activities. Firstly, the political/regulatory frameworks related to nuclear fuel cycles in both countries were reviewed. The various advanced fuel cycle scenarios that have been considered in both countries were then surveyed and summarized. The working group established the working reference scenario for the future cooperative activity that corresponds to a fuel cycle scenario being considered both in Japan and the U.S. This working scenario involves transitioning from a once-through fuel cycle utilizing light water reactors to a one-pass uranium-plutonium fuel recycle in light water reactors to a combination of light water reactors and fast reactors with plutonium, uranium, and minor actinide recycle, ultimately concluding with multiple recycle passes primarily using fast reactors. Considering the scenario, current and future expected waste streams, treatment and inventory were discussed, and the relevant information was summarized. Second, the waste management/disposal system optimization was discussed. Repository system concepts were reviewed, repository design concepts for the various classifications of nuclear waste were summarized, and the factors to consider in repository design and optimization were then discussed. Japan is considering various alternatives and options for the geologic disposal facility and the framework for future analysis of repository concepts was discussed. Regarding the advanced waste and storage form development, waste form technologies developed in both countries were surveyed and compared. Potential collaboration areas and activities were next identified. Disposal system optimization processes and techniques were reviewed, and factors to consider in future repository design optimization activities were also discussed. Then the potential collaboration areas and activities related to the optimization problem were extracted.« less
Helping Managers and Employees Cope with Work-Force Cutbacks.
ERIC Educational Resources Information Center
Morton, Gene L.
1983-01-01
Steps can be taken to reduce the need for work-force cutbacks and to prepare in advance by planning activities, defining severance awards, reducing anxiety, setting layoff criteria, providing outplacement services, and handling the timing, logistics, and aftermath of layoffs with sensitivity. (SK)
Hayati, Elyas; Majnounian, Baris; Abdi, Ehsan; Sessions, John; Makhdoum, Majid
2013-02-01
Changes in forest landscapes resulting from road construction have increased remarkably in the last few years. On the other hand, the sustainable management of forest resources can only be achieved through a well-organized road network. In order to minimize the environmental impacts of forest roads, forest road managers must design the road network efficiently and environmentally as well. Efficient planning methodologies can assist forest road managers in considering the technical, economic, and environmental factors that affect forest road planning. This paper describes a three-stage methodology using the Delphi method for selecting the important criteria, the Analytic Hierarchy Process for obtaining the relative importance of the criteria, and finally, a spatial multi-criteria evaluation in a geographic information system (GIS) environment for identifying the lowest-impact road network alternative. Results of the Delphi method revealed that ground slope, lithology, distance from stream network, distance from faults, landslide susceptibility, erosion susceptibility, geology, and soil texture are the most important criteria for forest road planning in the study area. The suitability map for road planning was then obtained by combining the fuzzy map layers of these criteria with respect to their weights. Nine road network alternatives were designed using PEGGER, an ArcView GIS extension, and finally, their values were extracted from the suitability map. Results showed that the methodology was useful for identifying road that met environmental and cost considerations. Based on this work, we suggest future work in forest road planning using multi-criteria evaluation and decision making be considered in other regions and that the road planning criteria identified in this study may be useful.
A Qualitative Study of Work-Life Choices in Academic Internal Medicine
Isaac, Carol; Byars-Winston, Angela; McSorley, Rebecca; Schultz, Alexandra; Kaatz, Anna; Carnes, Mary L.
2013-01-01
The high attrition rate of female physicians pursuing an academic medicine research career has not been examined in the context of career development theory. We explored how internal medicine residents and faculty experience their work within the context of their broader life domain in order to identify strategies for facilitating career advancement. Semi-structured interviews were conducted with a purposeful sample of 18 residents and 34 faculty members representing male and female physicians at different career stages. Using thematic analysis, three themes emerged: 1) the love of being a physician (“Raison d’être”), 2) family obligations (“2nd Shift”), and 3) balancing work demands with non-work life (“Negotiating Academic Medicine”). Female researchers and educators reported more strategies for multiple role planning and management than female practitioners. Interventions aimed at enhancing academic internists’ planning and self-efficacy for multiple role management should be investigated as a potential means for increasing participation and facilitate advancement. PMID:23605099
Policy on manager involvement in work re-integration: managers' experiences in a Canadian setting.
Maiwald, Karin; Meershoek, Agnes; de Rijk, Angelique; Nijhuis, Frans J N
2014-01-01
In Canada and other countries, sickness absence among workers is a significant concern. Local return-to-work policies developed by both management and workers' representatives are preferred to tackle the problem. This article examines how managers perceive this local bipartite agreed upon return-to-work policy, wherein a social constructivist view on the policy process is taken. In-depth interviews were held with 10 managers on their experiences with execution of this policy in a Canadian healthcare organization. Interviews were transcribed verbatim and qualitative analyses were completed to gain deep insight into the managers' perspectives. Results show that the managers viewed themselves as a linchpin between the workplace and the worker. They did not feel heard by the other stakeholders, wrestled with worker's limitations, struggled getting plans adjusted and became overextended to meet return-to-work objectives. The study shows that the managers felt unable to meet the responsibilities the policy demanded and got less involved in the return-to-work process than this policy intended. RTW policy needs to balance on the one hand, flexibility to safeguard active involvement of managers and, on the other hand, strictness regarding taking responsibility by stakeholders, particularly the health care and re-integration professionals.
Implementation of Industrial Work Practice management at vocational high school
NASA Astrophysics Data System (ADS)
Widodo, Joko; Samsudi, Sunyoto
2017-03-01
The purpose of this study was to develop a management model of entrepreneurship-based Industrial Work Practice (Prakerin) at Vocational High School. This research was planned for three years under Research and Development design. The respondents were public and private Vocational High Schools in Semarang, Salatiga and District of Demak, Central Java, Indonesia. Data were collected through interviews, questionnaires, observation, and documentation. The data were analyzed qualitatively and quantitatively. Preliminary study shows that the implementation of Industrial Work Practice at Vocational High School, which has been carried out, was only to prepare the graduates to become an employee of the industry instead of entrepreneur. Further study is needed to develop a management model of entrepreneurship-based Industrial Work Practice at Vocational High School.
Preliminary data on ASP2215: tolerability and efficacy in acute myeloid leukemia patients.
Thom, Claire
2015-09-01
Claire Thom speaks to Gemma Westcott, Commissioning Editor: Claire Thom joined Astellas in 2013 as the Therapeutic Area Head for Oncology in Global Development. In that role, she also serves as the STAR leader for Oncology for Astellas. Prior to Astellas, she spent 12 years with Takeda. Her last position was Senior Vice President, Portfolio Management, Drug Development Management and Medical Informatics and Strategic Operations within the Medical Division (the Division within Millennium responsible for oncology clinical drug development within Takeda). During her 4 years at Millennium, at various times, she had responsibility within the Medical Division for leading portfolio management, business operations (medical finance, annual and mid-range financial planning, space planning and operations, headcount resourcing, development goals process), clinical development operations (clinical operations, programming, data management, statistics, medical writing, clinical outsourcing), drug development management (project management), medical informatics (technology support for the division) and the strategic project management office for the division. Prior to joining Millennium, Claire Thom spent 18 months working in Osaka, Japan, during which she was responsible for developing the oncology strategy for Takeda that culminated in the acquisition of Millennium. Before going to Japan, she held positions of varying responsibility within the Takeda US development organization including the management of regulatory affairs, safety, biometrics and data management, clinical research and quality assurance. Claire Thom has particular expertise in organizational design and efficiency; she has successfully worked through integrations across multiple functions and redesigned business processes. She has a PharmD from University of Illinois (IL, USA) and over 20 years of pharmaceutical experience including positions in medical affairs and new product planning (over 11 years at Searle) and drug development (over 12 years at Takeda/Millennium).
A case management tool for occupational health nurses: development, testing, and application.
Mannon, J A; Conrad, K M; Blue, C L; Muran, S
1994-08-01
1. Case management is a process of coordinating an individual client's health care services to achieve optimal, quality care delivered in a cost effective manner. The case manager establishes a provider network, recommends treatment plans that assure quality and efficacy while controlling costs, monitors outcomes, and maintains a strong communication link among all the parties. 2. Through development of audit tools such as the one presented in this article, occupational health nurses can document case management activities and provide employers with measurable outcomes. 3. The Case Management Activity Checklist was tested using data from 61 firefighters' musculoskeletal injury cases. 4. The activities on the checklist are a step by step process: case identification/case disposition; assessment; return to work plan; resource identification; collaborative communication; and evaluation.
ERIC Educational Resources Information Center
Jones, Peter
This self-instructional unit for supervisors and managers in the British hotel and catering industry is intended to consolidate work covered in a 1-day course. The document begins with an introduction and advice on how to use the unit. The following topics are covered in the unit: (1) planning the menu; (2) food production systems; (3) kitchen…
Managing a Small HRD Department: You Can Do More than You Think. First Edition.
ERIC Educational Resources Information Center
McCoy, Carol P.
This book is a tool kit for human resource development (HRD) and training managers, trainers, and administrative assistants in small HRD departments. Part 1 deals with the challenges and opportunities of managing a small HRD department and with planning the strategy. Chapter 1 gives a sense of the workings of small HRD departments. Chapter 2…
Social science informing forest management — bringing new knowledge to fuels managers
Pamela Jakes
2007-01-01
To improve access, interpretability, and use of the full body of research, a pilot project was initiated by the USDA Forest Service to synthesize relevant scientific information and develop publications and decision support tools that managers can use to inform fuels treatment plans. This article provides an overview of the work of the Social Science Core Team. Team...
Oun, Abdulhakim M; Hadida, Elmokhtar M; Stewart, Charles
2017-06-01
Introduction No study on hospital staff preparedness for managing blast injuries has been conducted in Libya. The internal conflict in Libya since 2011 and the difficulties faced by the hospitals has highlighted the need for such studies. Hypothesis Physicians working in Tripoli (capital city Libya) hospitals are inadequately prepared for the management of blast injuries. A survey was conducted in all 13 hospitals in Tripoli between June 2014 and May 2015 by using interviews based on a questionnaire consisting of 29 questions covering physicians' education related to blast injury, hospital management of mass casualties, and aspects of hospital preparedness for such incidents. Of 3,799 physicians working in Tripoli hospitals, 607 physicians were interviewed (16.0%). All but one of the physicians reported that there was no disaster response plan, none of them had read such a plan, 496 (81.7%) reported that hospitals were not prepared, and 471 (77.6%) that hospitals were not equipped for blast injuries. Though 414 (68.2%) reported that radiological equipment was available, 597 (98.3%) revealed that hospitals do not adopt training for blast injury. Only 39 (6.4%) had received professional training, though 183 (30.1%) were seeing blast injury patients at least once a week in their daily practice. Nevertheless, 185 (30.5%) had previous knowledge and experience in blast injuries management and 338 (55.70%) were aware of the major physical findings, but only 75 (12.4%) were following specific guidelines. According to approximately one-third of the physicians (192; 31%), staff and patient safety were not priorities for the hospital administration. Almost all (606; 99.9%) revealed that personal protective equipment for chemical and nuclear accidents was not available. Preparedness for blast injuries in Tripoli hospitals is seriously deficient. Planning optimized blast and disaster management in Libya is essential. Oun AM , Hadida EM , Stewart C . Assessment of the knowledge of blast injuries management among physicians working in Tripoli hospitals (Libya). Prehosp Disaster Med. 2017;32(3):311-316.
The Organization of Higher Education: Managing Colleges for a New Era
ERIC Educational Resources Information Center
Bastedo, Michael N., Ed.
2012-01-01
Colleges and universities are best understood as networks of departments working together to fulfill a mission of education, innovation, and community partnership. To better understand how these large and complex institutions function, scholars can apply organizational and strategic planning concepts made familiar by business management. This book…
48 CFR 52.222-46 - Evaluation of Compensation for Professional Employees.
Code of Federal Regulations, 2011 CFR
2011-10-01
... contract. The Government will evaluate the plan to assure that it reflects a sound management approach and... understanding of work to be performed and should indicate the capability of the proposed compensation structure... of sound management judgment and lack of understanding of the requirement. (c) The Government is...
77 FR 14735 - New England Fishery Management Council; Public Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-13
... development of two management actions. The Committee will continue development of an action to modify measures... goals and objectives and possible funding mechanisms. The Committee may also discuss full retention of... receive an update on Plan Development Team work related to possible modifications to groundfish closed...
Safe Surgery Trainer Project Management Plan (PMP), Version 1.0
2014-05-30
Methodology including SCRUM (see http://en.wikipedia.org/wiki/Scrum_(management) for more info). Although this Safe Surgery Trainer - PMP Version 1.0 5...Agile method similar to Scrum . The internal development team works on a minor iteration cycle that begins/ends on Wednesday. At the beginning of
Plan Your Future! Career Management Skills for Students of Languages
ERIC Educational Resources Information Center
Randall, Laurence
2016-01-01
At the University of Westminster, the Department of Modern Languages and Cultures has developed a student employability and work-integrated learning project, "Career Management Skills" (CMS), for undergraduate language students. The main objective was to develop a comprehensive employability strategy for all students on all undergraduate…
75 FR 9590 - Environmental Management Site-Specific Advisory Board, Idaho National Laboratory
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-03
... current agenda): Progress to Cleanup. InSitu Grouting--Work Plan Follow-up Discussion. Experimental... meeting be announced in the Federal Register. DATES: Tuesday, March 16, 2010, 8 a.m.-5 p.m. Opportunities... in the areas of environmental restoration, waste management, and related activities. Tentative Topics...
Code of Federal Regulations, 2014 CFR
2014-01-01
... financial condition, work plan, and management ability. It is the responsibility of the intermediary to make..., including cash and investments, notes receivable from ultimate recipients, and the intermediary's security...
Code of Federal Regulations, 2010 CFR
2010-01-01
... financial condition, work plan, and management ability. It is the responsibility of the intermediary to make..., including cash and investments, notes receivable from ultimate recipients, and the intermediary's security...
Code of Federal Regulations, 2011 CFR
2011-01-01
... financial condition, work plan, and management ability. It is the responsibility of the intermediary to make..., including cash and investments, notes receivable from ultimate recipients, and the intermediary's security...
Code of Federal Regulations, 2012 CFR
2012-01-01
... financial condition, work plan, and management ability. It is the responsibility of the intermediary to make..., including cash and investments, notes receivable from ultimate recipients, and the intermediary's security...
Code of Federal Regulations, 2013 CFR
2013-01-01
... financial condition, work plan, and management ability. It is the responsibility of the intermediary to make..., including cash and investments, notes receivable from ultimate recipients, and the intermediary's security...
Health care logistics: who has the ball during disaster?
Vanvactor, Jerry D
2011-05-10
In contemporary organizations, a wide gamut of options is available for sustaining and supporting health care operations. When disaster strikes, despite having tenable plans for routine replenishment and operations, many organizations find themselves ill-prepared, ill-equipped, and without effective mechanisms in place to sustain operations during the immediate aftermath of a crisis. Health care operations can be abruptly halted due to the non-availability of supply. The purpose of this work is to add to a necessary, growing body of works related specifically to health care logistics preparedness and disaster mitigation. Logistics management is a specialized genre of expertise within the health care industry and is largely contributive to the success or failure of health care organizations. Logistics management requires extensive collaboration among multiple stakeholders-internal and external to an organization. Effective processes and procedures can be largely contributive to the success or failure of organizational operations. This article contributes to the closure of an obvious gap in professional and academic literature related to disaster health care logistics management and provides timely insight into a potential problem for leaders industry-wide. One critical aspect of disaster planning is regard for competent logistics management and the effective provision of necessary items when they are needed most. In many communities, there seems to be little evidence available regarding health care logistics involvement in disaster planning; at times, evidence of planning efforts perceptibly end at intra-organizational doors within facilities. Strategic planners are being continually reminded that health care organizations serve a principal role in emergency preparedness planning and must be prepared to fulfill the associated possibilities without notification. The concern is that not enough attention is being paid to repeated lessons being observed in disasters and emergency events.
Health care logistics: who has the ball during disaster?
VanVactor, Jerry D.
2011-01-01
In contemporary organizations, a wide gamut of options is available for sustaining and supporting health care operations. When disaster strikes, despite having tenable plans for routine replenishment and operations, many organizations find themselves ill-prepared, ill-equipped, and without effective mechanisms in place to sustain operations during the immediate aftermath of a crisis. Health care operations can be abruptly halted due to the non-availability of supply. The purpose of this work is to add to a necessary, growing body of works related specifically to health care logistics preparedness and disaster mitigation. Logistics management is a specialized genre of expertise within the health care industry and is largely contributive to the success or failure of health care organizations. Logistics management requires extensive collaboration among multiple stakeholders—internal and external to an organization. Effective processes and procedures can be largely contributive to the success or failure of organizational operations. This article contributes to the closure of an obvious gap in professional and academic literature related to disaster health care logistics management and provides timely insight into a potential problem for leaders industry-wide. One critical aspect of disaster planning is regard for competent logistics management and the effective provision of necessary items when they are needed most. In many communities, there seems to be little evidence available regarding health care logistics involvement in disaster planning; at times, evidence of planning efforts perceptibly end at intra-organizational doors within facilities. Strategic planners are being continually reminded that health care organizations serve a principal role in emergency preparedness planning and must be prepared to fulfill the associated possibilities without notification. The concern is that not enough attention is being paid to repeated lessons being observed in disasters and emergency events. PMID:24149034
In Charge. A Supervisor's Note Book. The Supervisor's "Self-Development" Series 1.
ERIC Educational Resources Information Center
Rabey, Gordon P.
This guide, which is intended for new supervisors and managers to use in an independent study setting, deals with the responsibilities of being in charge. The following topics are discussed in the first three sections: the supervisor and the job; procedures for planning and organizing work; and getting the work done (allocation of work, work…
Forecasting Traditional vs Blended Retirement System for Individual Service Members
2017-03-23
Service (IRS) puts retirement plan options offered to employees into four categories: profit-sharing plans, defined benefit plans, money purchase...Retirement System to allow the continuation pay to be offered at no less than eight years of service and no more than 12 years of service . The acceptance... Service Members Kevin M. Dwyer Follow this and additional works at: https://scholar.afit.edu/etd Part of the Business Administration, Management, and
Albeni Falls Wildlife Mitigation : Annual Report 2002.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Terra-Berns, Mary
The Albeni Falls Interagency Work Group continued to actively engage in implementing wildlife mitigation actions in 2002. Regular Work Group meetings were held to discuss budget concerns affecting the Albeni Falls Wildlife Mitigation Program, to present potential acquisition projects, and to discuss and evaluate other issues affecting the Work Group and Project. Work Group members protected 1,386.29 acres of wildlife habitat in 2002. To date, the Albeni Falls project has protected approximately 5,914.31 acres of wildlife habitat. About 21% of the total wildlife habitat lost has been mitigated. Administrative activities have increased as more properties are purchased and continue tomore » center on restoration, operation and maintenance, and monitoring. In 2001, Work Group members focused on development of a monitoring and evaluation program as well as completion of site-specific management plans. This year the Work Group began implementation of the monitoring and evaluation program performing population and plant surveys, data evaluation and storage, and map development as well as developing management plans. Assuming that the current BPA budget restrictions will be lifted in the near future, the Work Group expects to increase mitigation properties this coming year with several potential projects.« less
Medication Management: The Macrocognitive Workflow of Older Adults With Heart Failure.
Mickelson, Robin S; Unertl, Kim M; Holden, Richard J
2016-10-12
Older adults with chronic disease struggle to manage complex medication regimens. Health information technology has the potential to improve medication management, but only if it is based on a thorough understanding of the complexity of medication management workflow as it occurs in natural settings. Prior research reveals that patient work related to medication management is complex, cognitive, and collaborative. Macrocognitive processes are theorized as how people individually and collaboratively think in complex, adaptive, and messy nonlaboratory settings supported by artifacts. The objective of this research was to describe and analyze the work of medication management by older adults with heart failure, using a macrocognitive workflow framework. We interviewed and observed 61 older patients along with 30 informal caregivers about self-care practices including medication management. Descriptive qualitative content analysis methods were used to develop categories, subcategories, and themes about macrocognitive processes used in medication management workflow. We identified 5 high-level macrocognitive processes affecting medication management-sensemaking, planning, coordination, monitoring, and decision making-and 15 subprocesses. Data revealed workflow as occurring in a highly collaborative, fragile system of interacting people, artifacts, time, and space. Process breakdowns were common and patients had little support for macrocognitive workflow from current tools. Macrocognitive processes affected medication management performance. Describing and analyzing this performance produced recommendations for technology supporting collaboration and sensemaking, decision making and problem detection, and planning and implementation.
1991-03-01
direction of the work unit was changed to focus on exchanging information in the form of a workshop. It was * eyman-Dove, Linda, Waring, Michael R., and...plan should be broad in scope and evolutionary in principle to permit subsequent revisions neces- sary to fit changing conditions." Cost estimates for...began to update guidance to the field offices in the area of recreation and natural resource manage- ment. Times had changed . New water resource
Manufacturing engineering: Principles for optimization
NASA Astrophysics Data System (ADS)
Koenig, Daniel T.
Various subjects in the area of manufacturing engineering are addressed. The topics considered include: manufacturing engineering organization concepts and management techniques, factory capacity and loading techniques, capital equipment programs, machine tool and equipment selection and implementation, producibility engineering, methods, planning and work management, and process control engineering in job shops. Also discussed are: maintenance engineering, numerical control of machine tools, fundamentals of computer-aided design/computer-aided manufacture, computer-aided process planning and data collection, group technology basis for plant layout, environmental control and safety, and the Integrated Productivity Improvement Program.
Immunizations and African Americans
... Minority Health at HHS Advisory Committee Committees and Working Groups News HHS Disparities Action Plan National Partnership for Action Campaigns and Initiatives Performance Improvement and Management System Report to Congress Knowledge ...
Diabetes and Hispanic Americans
... Minority Health at HHS Advisory Committee Committees and Working Groups News HHS Disparities Action Plan National Partnership for Action Campaigns and Initiatives Performance Improvement and Management System Report to Congress Knowledge ...
... Minority Health at HHS Advisory Committee Committees and Working Groups News HHS Disparities Action Plan National Partnership for Action Campaigns and Initiatives Performance Improvement and Management System Report to Congress Knowledge ...
The career goals of nurses in some health care settings in Gauteng.
Jooste, K
2005-08-01
In nursing, purposeful career planning is essential if nurse practitioners want to make the right decisions about their work in order to strive towards and accomplish a meaningful quality of working life. Nurses should identify their career goals to be able to investigate their different career opportunities in their field of interest and direct their work according to a work strategy for years ahead. The purpose of this study was to explore and describe the career goals of post-basic nursing students with the aim of describing management strategies to guide the future career of post-basic nursing students in climbing the career ladder effectively and obtaining their set career goals. An explorative, descriptive, qualitative design was selected where the researcher worked inductively to explore and describe the needs (goals) and future planned actions of the participants regarding their career management as viewed for a period of five years. The researcher purposively and conveniently identified the sample as all the post-basic nursing students, namely 250 students, who were registered for the first, second and third year of nursing management courses in that period at a South African residential university. Two structured, open questions were developed. Each participant received the questions in writing and was asked to answer them. The QSR NUD*IST program was used for the qualitative management (categorization) of data. The results of the research questions related to five categories, namely becoming empowered, being promoted, being educated and professionally developed, partaking in research and taking up new projects.
Thoma, Jorun E; Waite, Marion A
2018-03-01
To gain knowledge of nurse case managers' experiences within the German acute care context of collaboration with patients and physicians in a discharge planning role; further to learn about patients' assignment to the management of the nurse case managers; and explicitly to explore critical incidences of interactions between nurse case managers, patients and healthcare practitioner in discharge planning to understand the factor that contributes to effective collaboration. The defined role of nurse case managers in many contexts is a patient-centred responsibility for a central task of discharge management of patients with complex physical and social needs. Some studies have indicated that the general impact of the role reduces readmission rates. Given the necessity to work interprofessionally to achieve a safe discharge, little is known about how nurse case managers achieve this collaboratively. A qualitative case study within a German teaching hospital of nurse case managers (N = 8). Data were collected through semi-structured interviews prompted by a critical incident technique and rigorously analysed through the lenses of sociocultural theory. Consistent object being worked upon was a safe and effective discharge from hospital with a focus on patient advocacy. Significant themes were a self-value or recognition by others of professional expertise, reciprocal value on the capabilities of others thorough relational expertise and negotiation with patients and an identification of case trajectories. More continuity of nurse case managers' care and management, clarity of role and transparency to peers, physicians and other professionals would be beneficial in ensuring appropriate referral of complex patients to nurse case managers responsibility. Clearer role description and benefit realisation of the nurse case managers could be achieved by interventions that are interprofessional and focus on the tasks that matter from a collaborative perspective. This could lead to refinement of available indicators and policy developments. © 2018 John Wiley & Sons Ltd.
Decontamination and decommissioning plan for processing contaminated NaK at the INEL
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaRue, D.M.; Dolenc, M.R.
1986-09-01
This decontamination and decommissioning (D D) plan describes the work elements and project management plan for processing four containers of contaminated sodium/potassium (NaK) and returning the Army Reentry Vehicle Facility Site (ARVFS) to a reusable condition. The document reflects the management plan for this project before finalizing the conceptual design and preliminary prototype tests of the reaction kinetics. As a result, the safety, environmental, and accident analyses are addressed as preliminary assessments before completion at a later date. ARVFS contains an earth-covered bunker, a cylindrical test pit and metal shed, and a cable trench connecting the two items. The bunkermore » currently stores the four containers of NaK from the meltdown of the EBR-1 Mark II core. The D D project addressed in this plan involves processing the contaminated NaK and returning the ARVFS to potential reuse after cleanup.« less
Decontamination and decommissioning plan for processing contaminated NaK at the INEL
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaRue, D.M.; Dolenc, M.R.
1986-09-01
This decontamination and decommissioning (D&D) plan describes the work elements and project management plan for processing four containers of contaminated sodium/potassium (NaK) and returning the Army Reentry Vehicle Facility Site (ARVFS) to a reusable condition. The document reflects the management plan for this project before finalizing the conceptual design and preliminary prototype tests of the reaction kinetics. As a result, the safety, environmental, and accident analyses are addressed as preliminary assessments before completion at a later date. ARVFS contains an earth-covered bunker, a cylindrical test pit and metal shed, and a cable trench connecting the two items. The bunker currentlymore » stores the four containers of NaK from the meltdown of the EBR-1 Mark II core. The D&D project addressed in this plan involves processing the contaminated NaK and returning the ARVFS to potential reuse after cleanup.« less
1990-02-01
proposal to the HQ USAF than optimum communication be- While the report indicated that this recommended a long-range, integrated tween the user and the...SRA), conduct of The three functional Working Integrated logistics program plan- tradeoff studies, and development of Groups are separated into the...as well * INTEGRATION as a rapid retargeting capability. V. SYSTEM REQUIREMENTS Working Conditions At the same time, SAC realized that VI. SYSTEM
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-27
... quantifying the results of the project should be submitted to the FHWA. 10. Proposals should not exceed 20... communications plan, a risk management plan and a work breakdown structure. V. Application Review Information... other locations/projects and possibly serve as a model for other locations. B. Review Standards 1. All...
Career Survival: Strategic Job and Role Planning. Pfeiffer Career Series.
ERIC Educational Resources Information Center
Schein, Edgar H.
This book was designed to help managers and employees to decipher the two crucial elements in work design and human resource planning: the role network that surrounds every position and the key stakeholders whose expectations define the essence of the job. It provides a structured process for analyzing one's own job as well as the jobs of…
Preservation at Stony Brook. Preservation Planning Program. Study Report.
ERIC Educational Resources Information Center
Cook, Donald C.; And Others
This final report is a product of a Preservation Planning Program (PPP) self-study conducted by the State University of New York (SUNY), Stony Brook, working with the Association of Research Libraries' (ARL) Office of Management Studies (OMS). The PPP is designed to put self-help tools into the hands of library staff responsible for developing…
Code of Federal Regulations, 2010 CFR
2010-01-01
... Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) FEDERAL FLEXIBLE BENEFITS PLAN: PRE-TAX PAYMENT OF HEALTH BENEFITS PREMIUMS Reemployed Annuitants and Survivor Annuitants... reemployed in a position that conveys FEHB eligibility and is covered by the premium conversion plan, you are...
Implementation plan for HANDI 2000 TWRS master equipment list
DOE Office of Scientific and Technical Information (OSTI.GOV)
BENNION, S.I.
This document presents the implementation plan for an additional deliverable of the HANDI 2000 Project. The PassPort Equipment Data module processes include those portions of the COTS PassPort system required to support tracking and management of the Master Equipment List for Lockheed Martin Hanford Company (LMHC) and custom software created to work with the COTS products.
ERIC Educational Resources Information Center
Noll, Gayle
In response to a 3% decline in fall 1977 enrollments, Odessa College developed and implemented a comprehensive marketing program. After initial planning, a marketing task force and nine mini-task forces were created to deal with the topics of community economic markets, community cultural markets, student retention, student recruitment techniques,…
Commercial Aircraft Integrated Vehicle Health Management Study
NASA Technical Reports Server (NTRS)
Reveley, Mary S.; Briggs, Jeffrey L.; Evans, Joni K.; Jones, Sharon Monica; Kurtoglu, Tolga; Leone, Karen M.; Sandifer, Carl E.; Thomas, Megan A.
2010-01-01
Statistical data and literature from academia, industry, and other government agencies were reviewed and analyzed to establish requirements for fixture work in detection, diagnosis, prognosis, and mitigation for IVHM related hardware and software. Around 15 to 20 percent of commercial aircraft accidents between 1988 and 2003 involved inalftfnctions or failures of some aircraft system or component. Engine and landing gear failures/malfunctions dominate both accidents and incidents. The IVI vl Project research technologies were found to map to the Joint Planning and Development Office's National Research and Development Plan (RDP) as well as the Safety Working Group's National Aviation Safety Strategic. Plan (NASSP). Future directions in Aviation Technology as related to IVHlvl were identified by reviewing papers from three conferences across a five year time span. A total of twenty-one trend groups in propulsion, aeronautics and aircraft categories were compiled. Current and ftiture directions of IVHM related technologies were gathered and classified according to eight categories: measurement and inspection, sensors, sensor management, detection, component and subsystem monitoring, diagnosis, prognosis, and mitigation.
Edwards, M.D.
1987-01-01
The Water Resources Division of the U.S. Geological Survey is developing a National Water Information System (NWIS) that will integrate and replace its existing water data and information systems of the National Water Data Storage and Retrieval System, National Water Data Exchange, National Water-Use Information, and Water Resources Scientific Information Center programs. It will be a distributed data system operated as part of the Division 's Distributed Information System, which is a network of computers linked together through a national telecommunication network known as GEONET. The NWIS is being developed as a series of prototypes that will be integrated as they are completed to allow the development and implementation of the system in a phased manner. It also is being developed in a distributed manner using personnel who work under the coordination of a central NWIS Project Office. Work on the development of the NWIS began in 1983 and it is scheduled for completion in 1990. This document presents an overall plan for the design, development, implementation, and operation of the system. Detailed discussions are presented on each of these phases of the NWIS life cycle. The planning, quality assurance, and configuration management phases of the life cycle also are discussed. The plan is intended to be a working document for use by NWIS management and participants in its design and development and to assist offices of the Division in planning and preparing for installation and operation of the system. (Author 's abstract)
Web Application Software for Ground Operations Planning Database (GOPDb) Management
NASA Technical Reports Server (NTRS)
Lanham, Clifton; Kallner, Shawn; Gernand, Jeffrey
2013-01-01
A Web application facilitates collaborative development of the ground operations planning document. This will reduce costs and development time for new programs by incorporating the data governance, access control, and revision tracking of the ground operations planning data. Ground Operations Planning requires the creation and maintenance of detailed timelines and documentation. The GOPDb Web application was created using state-of-the-art Web 2.0 technologies, and was deployed as SaaS (Software as a Service), with an emphasis on data governance and security needs. Application access is managed using two-factor authentication, with data write permissions tied to user roles and responsibilities. Multiple instances of the application can be deployed on a Web server to meet the robust needs for multiple, future programs with minimal additional cost. This innovation features high availability and scalability, with no additional software that needs to be bought or installed. For data governance and security (data quality, management, business process management, and risk management for data handling), the software uses NAMS. No local copy/cloning of data is permitted. Data change log/tracking is addressed, as well as collaboration, work flow, and process standardization. The software provides on-line documentation and detailed Web-based help. There are multiple ways that this software can be deployed on a Web server to meet ground operations planning needs for future programs. The software could be used to support commercial crew ground operations planning, as well as commercial payload/satellite ground operations planning. The application source code and database schema are owned by NASA.
Implementing the EU Floods Directive (2007/60/EC) in Austria: Flood Risk Management Plans
NASA Astrophysics Data System (ADS)
Neuhold, Clemens
2013-04-01
he Directive 2007/60/EC of the European Parliament and of the Council of 23 October 2007 on the assessment and management of flood risks (EFD) aims at the reduction of the adverse consequences for human health, the environment, cultural heritage and economic activity associated with floods in the Community. This task is to be achieved based on three process steps (1) preliminary flood risk assessment (finalised by the end of 2011), (2) flood hazard maps and flood risk maps (due 2013) and (3) flood risk management plans (due 2015). Currently, an interdisciplinary national working group is defining the methodological framework for flood risk management plans in Austria supported by a constant exchange with international bodies and experts. Referring to the EFD the components of the flood risk management plan are (excerpt): 1. conclusions of the preliminary flood risk assessment 2. flood hazard maps and flood risk maps and the conclusions that can be drawn from those maps 3. a description of the appropriate objectives of flood risk management 4. a summary of measures and their prioritisation aiming to achieve the appropriate objectives of flood risk management The poster refers to some of the major challenges in this process, such as the legal provisions, coordination of administrative units, definition of public relations, etc. The implementation of the EFD requires the harmonisation of legal instruments of various disciplines (e.g. water management, spatial planning, civil protection) enabling a coordinated - and ideally binding - practice of flood risk management. This process is highly influenced by the administrative organisation in Austria - federal, provincial and municipality level. The Austrian approach meets this organisational framework by structuring the development of the flood risk management plan into 3 time-steps: (a) federal blueprint, (b) provincial editing and (c) federal finishing as well as reporting to the European Commission. Each time-step addresses different administrative levels and spatial scales accompanied by the active involvement of interested parties.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barariu, G.
2008-07-01
The paper presents the progress of the Decontamination Plan and Radioactive Waste Management Plan which accompanies the Decommissioning Plan for research reactor VVR-S located in Magurele, Ilfov, near Bucharest, Romania. The new variant of the Decommissioning Plan was elaborated taking into account the IAEA recommendation concerning radioactive waste management. A new feasibility study for VVR-S decommissioning was also elaborated. The preferred safe management strategy for radioactive wastes produced by reactor decommissioning is outlined. The strategy must account for reactor decommissioning, as well as rehabilitation of the existing Radioactive Waste Treatment Plant and the upgrade of the Radioactive Waste Disposal Facilitymore » at Baita-Bihor. Furthermore, the final rehabilitation of the laboratories and reusing of cleaned reactor building is envisaged. An inventory of each type of radioactive waste is presented. The proposed waste management strategy is selected in accordance with the IAEA assistance. Environmental concerns are a part of the radioactive waste management strategy. In conclusion: The current version 8 of the Draft Decommissioning Plan which include the Integrated concept of Decontamination and Decommissioning and Radwaste Management, reflects the substantial work that has been incorporated by IFIN-HH in collaboration with SITON, which has resulted in substantial improvement in document The decommissioning strategy must take into account costs for VVR-S Reactor decommissioning, as well as costs for much needed refurbishments to the radioactive waste treatment plant and the Baita-Bihor waste disposal repository. Several improvements to the Baita-Bihor repository and IFIN-HH waste treatment facility were proposed. The quantities and composition of the radioactive waste generated by VVR-S Reactor dismantling were again estimated by streams and the best demonstrated practicable processing solution was proposed. The estimated quantities of materials to be managed in the near future raise some issues that need to be solved swiftly, such as treatment of aluminum and lead and graphite management. It is envisaged that these materials to be treated to Subsidiary for Nuclear Research (SCN) Pitesti. (authors)« less
Infant Mortality and Hispanic Americans
... Minority Health at HHS Advisory Committee Committees and Working Groups News HHS Disparities Action Plan National Partnership for Action Campaigns and Initiatives Performance Improvement and Management System Report to Congress Knowledge ...
Heart Disease and African Americans
... Minority Health at HHS Advisory Committee Committees and Working Groups News HHS Disparities Action Plan National Partnership for Action Campaigns and Initiatives Performance Improvement and Management System Report to Congress Knowledge ...
Cancer and Asians/Pacific Islanders
... Minority Health at HHS Advisory Committee Committees and Working Groups News HHS Disparities Action Plan National Partnership for Action Campaigns and Initiatives Performance Improvement and Management System Report to Congress Knowledge ...
Infant Mortality and African Americans
... Minority Health at HHS Advisory Committee Committees and Working Groups News HHS Disparities Action Plan National Partnership for Action Campaigns and Initiatives Performance Improvement and Management System Report to Congress Knowledge ...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matuszak, M; Anderson, C; Lee, C
Purpose: With electronic medical records, patient information for the treatment planning process has become disseminated across multiple applications with limited quality control and many associated failure modes. We present the development of a single application with a centralized database to manage the planning process. Methods: The system was designed to replace current functionalities of (i) static directives representing the physician intent for the prescription and planning goals, localization information for delivery, and other information, (ii) planning objective reports, (iii) localization and image guidance documents and (iv) the official radiation therapy prescription in the medical record. Using the Eclipse Scripting Applicationmore » Programming Interface, a plug-in script with an associated domain-specific SQL Server database was created to manage the information in (i)–(iv). The system’s user interface and database were designed by a team of physicians, clinical physicists, database experts, and software engineers to ensure usability and robustness for clinical use. Results: The resulting system has been fully integrated within the TPS via a custom script and database. Planning scenario templates, version control, approvals, and logic-based quality control allow this system to fully track and document the planning process as well as physician approval of tradeoffs while improving the consistency of the data. Multiple plans and prescriptions are supported along with non-traditional dose objectives and evaluation such as biologically corrected models, composite dose limits, and management of localization goals. User-specific custom views were developed for the attending physician review, physicist plan checks, treating therapists, and peer review in chart rounds. Conclusion: A method was developed to maintain cohesive information throughout the planning process within one integrated system by using a custom treatment planning management application that interfaces directly with the TPS. Future work includes quantifying the improvements in quality, safety and efficiency that are possible with the routine clinical use of this system. Supported in part by NIH-P01-CA-059827.« less
Assessment of time management attitudes among health managers.
Sarp, Nilgun; Yarpuzlu, Aysegul Akbay; Mostame, Fariba
2005-01-01
These days, working people are finding it difficult to manage their time, get more done at work, and find some balance in their work and personal lives. Successful time management is often suggested to be a product of organizing skills, however, what works for one person may not work for others. Context current competence assessment formats for physicians, health professionals, and managers during their training years reliably test core knowledge and basic skills. However, they may underemphasize some important domains of professional medical practice. Thus, in addition to assessments of basic skills, new formats that assess clinical reasoning, expert judgment, management of ambiguity, professionalism, time management, learning strategies, and teamwork to promise a multidimensional assessment while maintaining adequate reliability and validity in classic health education and health care institutional settings are needed to be worked on. It should be kept in mind that institutional support, reflection, and mentoring must accompany the development of assessment programs. This study was designed to describe the main factors that consume time, effective hours of work, time management opportunities, and attitudes and behaviors of health professionals and managers on time management concept through assessment by the assessment tool Time Management Inquiry Form (TMIQ-F). The study was conducted at the State Hospital, Social Security Hospital, and University Hospital at Kirikkale, Turkey between October 1999 and January 2000, including 143 subjects defined as medical managers and medical specialists. According to the results, a manager should give priority to the concept of planning, which may be counted among the efficient time management techniques, and educate him/herself on time management.
Sonmez, Betul; Yildirim, Aytolan
2009-12-01
The aim was to determine the opinions of nurse managers about career planning and development for nurses in hospitals. Career planning and development are defined as an important and necessary tool in the development of nurses as professionals and in retaining nurses in a facility. A descriptive survey. The research population comprised nurse managers in 200+ bed hospitals on the European side of Istanbul province (n = 668). The entire population was targeted and 373 nurse managers were included in the study (55.8% return rate). Data were collected with a 32-item survey form that had three sections to determine the nurse managers' demographic characteristics, the career development practices at the facility where they worked, the nurse managers' responsibilities for career development and their expected competencies and recommendations. The findings of this study suggest that the most common technique used for nurses for career development was education programs, the career development practices of private hospitals were more developed than public hospitals and the nurse managers' perceptions about career development were different according to their management level, age group and educational level (p < 0.05). Although different practices were found in public and private hospitals in Turkey there were no effective career development practices identified and the nurse managers did not have agreement on the subject of career development. Hospitals which provide opportunity for horizontal and vertical promotion and have clear development policies will be successful hospitals which are preferred by high quality nurses. This study draws attention to the importance of career planning in nursing and the need for nurse managers to take an active role in career planning and development.
Ernest Orlando Lawrence Berkeley National Laboratory institutional plan, FY 1996--2001
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-11-01
The FY 1996--2001 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory mission, strategic plan, core business areas, critical success factors, and the resource requirements to fulfill its mission in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Laboratory Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Core Business Areas section identifies those initiatives that are potential new research programs representing major long-term opportunities for the Laboratory, and the resources required for their implementation. It alsomore » summarizes current programs and potential changes in research program activity, science and technology partnerships, and university and science education. The Critical Success Factors section reviews human resources; work force diversity; environment, safety, and health programs; management practices; site and facility needs; and communications and trust. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process. The plan identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office of Planning and Communications from information contributed by the Laboratory`s scientific and support divisions.« less
5 CFR 892.102 - What is premium conversion and how does it work?
Code of Federal Regulations, 2013 CFR
2013-01-01
... 5 Administrative Personnel 2 2013-01-01 2013-01-01 false What is premium conversion and how does it work? 892.102 Section 892.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) FEDERAL FLEXIBLE BENEFITS PLAN: PRE-TAX PAYMENT OF HEALTH BENEFITS...
5 CFR 892.102 - What is premium conversion and how does it work?
Code of Federal Regulations, 2011 CFR
2011-01-01
... 5 Administrative Personnel 2 2011-01-01 2011-01-01 false What is premium conversion and how does it work? 892.102 Section 892.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) FEDERAL FLEXIBLE BENEFITS PLAN: PRE-TAX PAYMENT OF HEALTH BENEFITS...
5 CFR 892.102 - What is premium conversion and how does it work?
Code of Federal Regulations, 2014 CFR
2014-01-01
... 5 Administrative Personnel 2 2014-01-01 2014-01-01 false What is premium conversion and how does it work? 892.102 Section 892.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) FEDERAL FLEXIBLE BENEFITS PLAN: PRE-TAX PAYMENT OF HEALTH BENEFITS...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Policy. 970.1170-1 Section... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Describing Agency Needs 970.1170-1 Policy. Each contract... scope of work section that describes, in general terms, work planned and/or required to be performed...
Worklife Visions. Redefining Work for the Information Economy.
ERIC Educational Resources Information Center
Hallett, Jeffrey J.
The changing economy is affecting everyone's life, especially from the standpoint of prospects for earning a living and pursuing a meaningful career. A clear understanding of the changing nature and dimensions of work is a necessary requisite to planning careers, managing employees, and developing effective employment policies. Preparing for the…
National Site for the Regional IPM Centers
Agriculture Working Group of State and Federal Scientists Summaries of past meetings November 13, 2002 January , 2004 Active membership Action plans of stakeholders United States Department of Agriculture - National Institute of Food and Agriculture Website managed by the Southern IPM Center. Design adapted from work by
Working with a Board of Directors: Making the Partnership Stronger.
ERIC Educational Resources Information Center
Ratekin, Cindy; Bess, Gary
1996-01-01
Focuses on the role of the board of directors within nonprofit child care centers and how the board and center staff can work well together for the agency. Outlines each partner's role in the four areas of center responsibility: financial oversight, program planning, resource development, and personnel management. (EV)
Group Work and Outreach Plans for College Counselors
ERIC Educational Resources Information Center
Fitch, Trey, Ed.; Marshall, Jennifer L., Ed.
2011-01-01
In this book, group work and college counseling leaders offer step-by-step instruction in the effective use and processing of structured group activities on topics such as test anxiety; stress and anxiety management; ADHD; career development; substance abuse; eating disorders; and the unique concerns faced by GLBT students, first-generation…
Beyond fighting fires and chasing tails? Chronic illness care plans in Ontario, Canada.
Russell, Grant; Thille, Patricia; Hogg, William; Lemelin, Jacques
2008-01-01
Recent work has conceptualized new models for the primary care management of patients with chronic illness. This study investigated the experience of family physicians and patients with a chronic illness management initiative that involved the joint formulation of comprehensive individual patient care plans. A qualitative evaluation, framed by phenomenology, immediately followed a randomized controlled trial examining the effect of external facilitators in enhancing the delivery of chronic condition care planning in primary care. The study, set in Ontario family practices, used semistructured in-depth interviews with a purposive sample of 13 family physicians, 20 patients, and all 3 study facilitators. Analysis used independent transcript review and constant comparative methods. Despite the intervention being grounded in patient-centered principles, family physicians generally viewed chronic illness management from a predominantly biomedical perspective. Only a few enthusiasts viewed systematic care planning as a new approach to managing patients with chronic illness. Most family physicians found the strategy to be difficult to implement within existing organizational and financial constraints. For these participants, care planning conflicted with preexisting concepts of their role and of their patient's abilities to become partners in care. The few patients who noticed the process spoke favorably about their experience. Although the experiences of the enthusiastic family physicians were encouraging, we found important individual-level barriers to chronic illness management in primary care. These issues seemed to transcend existing organizational and resource constraints.
Medication Management: The Macrocognitive Workflow of Older Adults With Heart Failure
2016-01-01
Background Older adults with chronic disease struggle to manage complex medication regimens. Health information technology has the potential to improve medication management, but only if it is based on a thorough understanding of the complexity of medication management workflow as it occurs in natural settings. Prior research reveals that patient work related to medication management is complex, cognitive, and collaborative. Macrocognitive processes are theorized as how people individually and collaboratively think in complex, adaptive, and messy nonlaboratory settings supported by artifacts. Objective The objective of this research was to describe and analyze the work of medication management by older adults with heart failure, using a macrocognitive workflow framework. Methods We interviewed and observed 61 older patients along with 30 informal caregivers about self-care practices including medication management. Descriptive qualitative content analysis methods were used to develop categories, subcategories, and themes about macrocognitive processes used in medication management workflow. Results We identified 5 high-level macrocognitive processes affecting medication management—sensemaking, planning, coordination, monitoring, and decision making—and 15 subprocesses. Data revealed workflow as occurring in a highly collaborative, fragile system of interacting people, artifacts, time, and space. Process breakdowns were common and patients had little support for macrocognitive workflow from current tools. Conclusions Macrocognitive processes affected medication management performance. Describing and analyzing this performance produced recommendations for technology supporting collaboration and sensemaking, decision making and problem detection, and planning and implementation. PMID:27733331
Project-based learning as a contributing factor to graduates' work readiness
NASA Astrophysics Data System (ADS)
Jollands, Margaret; Jolly, Lesley; Molyneaux, Tom
2012-05-01
This paper explores what work readiness means for two cohorts of graduate engineers, one from a traditional curriculum, the second from a largely project-based curriculum. Professional bodies and employers have defined a set of attributes for engineering graduates so that graduates will be 'work ready'. Problem-based learning (PBL) is claimed to be a suitable approach to develop such skills. The graduates were interviewed some months after starting work, along with their managers. All the graduates recognised the benefits of taking PBL subjects as well as vacation work, with success in communication attributed more to PBL. Both cohorts had similar learning outcomes, high skill levels in project management, problem solving, communication skills, research and sustainability. A skills gap in ethics was identified for both cohorts of graduates and their managers. Further work is planned to link skill development with undergraduate learning experience.
Nurse manager perceptions of role satisfaction and retention at an academic medical center.
Zwink, Jennifer E; Dzialo, Maureen; Fink, Regina M; Oman, Kathleen S; Shiskowsky, Kaycee; Waite, Kathi; DeVine, Deborah; Sanders, Carolyn L; Le-Lazar, Jamie T T
2013-03-01
The aim of this study was to explore the perceptions of inpatient acute care nurse managers (NM) employed at an academic Magnet® hospital about factors that influence NM retention, including current work environment, satisfaction, work-life balance, sucssful NM traits, and personal development and educational needs. Nurse managers are challenged with increased workloads impacting their ability to implement all role components. A qualitative descriptive study design used focus group methodology to explore perceptions of the NM role. Nurse managers identified staff recognition, support, peer relationships, collaboration, and ability to make positive change as factors influencing their decision to remain in the role. Burnout factors included workload issues, work-life imbalance, and difficulty sustaining positive relationships. Traits supporting success were communication, resiliency, integrity, and a visionary outlook. Suggestions for NM development and education were identified. Findings can be used to improve NM satisfaction, work-life balance, recruitment, retention, and succession planning.
Diabetes and Asians and Pacific Islanders
... Minority Health at HHS Advisory Committee Committees and Working Groups News HHS Disparities Action Plan National Partnership for Action Campaigns and Initiatives Performance Improvement and Management System Report to Congress Knowledge ...
Diabetes and Native Hawaiians/Pacific Islanders
... Minority Health at HHS Advisory Committee Committees and Working Groups News HHS Disparities Action Plan National Partnership for Action Campaigns and Initiatives Performance Improvement and Management System Report to Congress Knowledge ...
Asthma and Native Hawaiians/Pacific Islanders
... Minority Health at HHS Advisory Committee Committees and Working Groups News HHS Disparities Action Plan National Partnership for Action Campaigns and Initiatives Performance Improvement and Management System Report to Congress Knowledge ...
Stroke and Native Hawaiians/Pacific Islanders
... Minority Health at HHS Advisory Committee Committees and Working Groups News HHS Disparities Action Plan National Partnership for Action Campaigns and Initiatives Performance Improvement and Management System Report to Congress Knowledge ...
Asthma and American Indians/Alaska Natives
... Minority Health at HHS Advisory Committee Committees and Working Groups News HHS Disparities Action Plan National Partnership for Action Campaigns and Initiatives Performance Improvement and Management System Report to Congress Knowledge ...
Chronic Liver Disease and Hispanic Americans
... Minority Health at HHS Advisory Committee Committees and Working Groups News HHS Disparities Action Plan National Partnership for Action Campaigns and Initiatives Performance Improvement and Management System Report to Congress Knowledge ...
Chronic Liver Disease and African Americans
... Minority Health at HHS Advisory Committee Committees and Working Groups News HHS Disparities Action Plan National Partnership for Action Campaigns and Initiatives Performance Improvement and Management System Report to Congress Knowledge ...
Immunizations and Asians and Pacific Islanders
... Minority Health at HHS Advisory Committee Committees and Working Groups News HHS Disparities Action Plan National Partnership for Action Campaigns and Initiatives Performance Improvement and Management System Report to Congress Knowledge ...
Designing the role of the embedded care manager.
Hines, Patricia; Mercury, Marge
2013-01-01
: The role of the professional case manager is changing rapidly. Health reform has called upon the industry to ensure that care is delivered in an efficient, effective, and high-quality and low cost manner. As a means to achieve this objective, health plans and health systems are moving the care manager out of a centralized location within their organizations to "embedding" them into physician offices. This move enables the care manager to work alongside the primary care physicians and their high-risk patients. This article discusses the framework for designing and implementing an embedded care manager role into a physician practice. Key elements of the program are discussed. IMPLICATIONS FOR CARE MANAGEMENT:: Historically care management has played a foundational role in improving the quality of care for individuals and populations via the efficient and effective use of resources. Now with the goals of health care reform, a successful transition from a volume-based to value-based reimbursement system requires primary care physicians to welcome care managers into their practices to improve patient care, quality, and costs through care coordination across health care settings and populations. : As patient-centered medical homes and integrated delivery systems formulate their plans for population health management, their efforts have included embedding a care manager in the primary practice setting. Having care managers embedded at the physician offices increases their ability to collaborate with the physician and their staff in the implementation and monitoring care plans for their patients. : Implementing an embedded care manager into an existing physician's practice requires the following:Although the embedded care manager is a highly evolving role, physician groups are beginning to realize the benefits from their care management collaborations. Examples cited include improved outreach and coordination, patient adherence to care plans, and improved quality of life.
Nurse absence--the causes and the consequences.
Beil-Hildebrand, M
1996-01-01
This paper addresses nurse absence as it occurs in health care organizations and as a form of withdrawal behaviour from work. Absence represents a traditional domain of conflict between nursing management and their employees in day-to-day practice. The aim of the following discussion is to extend nursing management's understanding of the topic as a precondition for well-balanced schedules and effective human resource planning. A discussion of planned and unplanned absence thus arises and appropriate types of measurement, taking employee absence behaviour into account, are outlined. The implications of the arguments, developed in detail in the first part of the paper, are applied in the second part using a hypothetical account. In order to illustrate the importance of managing absence by nursing management, a method for calculating schedules is described which investigates the organizational control of planned and unplanned absence. This method proposes a seven stage calculation and highlights the processes that are essential for taking absence into account.
ERIC Educational Resources Information Center
Davlatov, Ismail D.; Mulloev, Sharif M.
This book provides an indepth description and analysis of financial management and budgetary procedures for education in Tajikistan. This country's case is exceptional even for the group of newly independent post-Soviet countries. In addition to the difficulties of the transition period similar for all former centrally planned economies…
ERIC Educational Resources Information Center
Bouapao, Lytou; Sengchandavong, Ouam; Sihavong, Siphandone
This study provides an indepth description of financial management and budgetary procedures for education as well as a detailed analysis of major problems, recent developments, and new issues in Cambodia, Laos, and Vietnam. Laos, formerly one of the centrally planned economies, was previously considered "dormant" because of its limited…
Embedded Managers in Informal Learning Spaces
ERIC Educational Resources Information Center
Raisin, Victoria; Fennewald, Joseph
2016-01-01
Many universities have decided to invest in updating their informal learning spaces. One decision to be made in planning the space is how to staff it. The researchers carried out a qualitative case study to better understand the perspective of learning space managers who work in offices within their assigned space. The research generated six…
ERIC Educational Resources Information Center
Zimmerman, Toni Schindler; Fetsch, Robert J.
1994-01-01
Notes that internal and external threats could squeeze ranch and farm families out of business. Offers six-step Consensus Management Model that combines strategic planning with psychoeducation/family therapy. Describes pilot test with intergenerational ranch family that indicated improvements in family functioning, including reduced stress and…
75 FR 346 - Environmental Management Site-Specific Advisory Board, Idaho National Laboratory
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-05
... current agenda): Progress to Cleanup. InSitu Grouting--Draft Remedial Design and Remedial Action Work Plan... this meeting be announced in the Federal Register. DATES: Wednesday, January 20, 2010, 8 a.m.-5 p.m... in the areas of environmental restoration, waste management, and related activities. Tentative Topics...
The Application of Project Management Techniques to College and University Admissions Activities.
ERIC Educational Resources Information Center
Bickers, Doyle
1993-01-01
The process of project management is illustrated through application to one activity, development of a new brochure, within the admissions program of a fictional college. The project life cycle is described, and a work responsibility schedule, project completion schedule, and critical path chart are used as planning and implementation tools. (MSE)
Language Management and Language Problems in Belarus: Education and Beyond
ERIC Educational Resources Information Center
Giger, Markus; Sloboda, Marian
2008-01-01
This article provides an overview of the sociolinguistic situation in Belarus, the most russified of the post-Soviet countries. It summarizes language policy and legislation, and deals in more detail with language management and selected language problems in Belarusian education. It also contributes to the work on language planning by applying…
Integrating human resources and program-planning strategies.
Smith, J E
1989-06-01
The integration of human resources management (HRM) strategies with long-term program-planning strategies in hospital pharmacy departments is described. HRM is a behaviorally based, comprehensive strategy for the effective management and use of people that seeks to achieve coordination and integration with overall planning strategies and other managerial functions. It encompasses forecasting of staffing requirements; determining work-related factors that are strong "motivators" and thus contribute to employee productivity and job satisfaction; conducting a departmental personnel and skills inventory; employee career planning and development, including training and education programs; strategies for promotion and succession, including routes of advancement that provide alternatives to the managerial route; and recruitment and selection of new personnel to meet changing departmental needs. Increased competitiveness among hospitals and a shortage of pharmacists make it imperative that hospital pharmacy managers create strategies to attract, develop, and retain the right individuals to enable the department--and the hospital as a whole--to grow and change in response to the changing health-care environment in the United States. Pharmacy managers would be greatly aided in this mission by the establishment of a well-defined, national strategic plan for pharmacy programs and services that includes an analysis of what education and training are necessary for their successful accomplishment. Creation of links between overall program objectives and people-planning strategies will aid hospital pharmacy departments in maximizing the long-term effectiveness of their practice.
Siirala, Eriikka; Peltonen, Laura-Maria; Lundgrén-Laine, Heljä; Salanterä, Sanna; Junttila, Kristiina
2016-09-01
To describe the tactical and the operational decisions made by nurse managers when managing the daily unit operation in peri-operative settings. Management is challenging as situations change rapidly and decisions are constantly made. Understanding decision-making in this complex environment helps to develop decision support systems to support nurse managers' operative and tactical decision-making. Descriptive cross-sectional design. Data were collected from 20 nurse managers with the think-aloud method during the busiest working hours and analysed using thematic content analysis. Nurse managers made over 700 decisions; either ad hoc (n = 289), near future (n = 268) or long-term (n = 187) by nature. Decisions were often made simultaneously with many interruptions. Ad hoc decisions covered staff allocation, ensuring adequate staff, rescheduling surgical procedures, confirmation tangible resources and following-up the daily unit operation. Decisions in the near future were: planning of surgical procedures and tangible resources, and planning staff allocation. Long-term decisions were: human recourses, nursing development, supplies and equipment, and finances in the unit. Decision-making was vulnerable to interruptions, which sometimes complicated the managing tasks. The results can be used when planning decision support systems and when defining the nurse managers' tasks in peri-operative settings. © 2016 John Wiley & Sons Ltd.
Kornfeld, R; Rupp, K
2000-01-01
The Social Security Administration (SSA) initiated Project NetWork in 1991 to test case management as a means of promoting employment among persons with disabilities. The demonstration, which targeted Social Security Disability Insurance (DI) beneficiaries and Supplemental Security Income (SSI) applicants and recipients, offered intensive outreach, work-incentive waivers, and case management/referral services. Participation in Project NetWork was voluntary. Volunteers were randomly assigned to the "treatment" group or the "control" group. Those assigned to the treatment group met individually with a case or referral manager who arranged for rehabilitation and employment services, helped clients develop an individual employment plan, and provided direct employment counseling services. Volunteers assigned to the control group could not receive services from Project NetWork but remained eligible for any employment assistance already available in their communities. For both treatment and control groups, the demonstration waived specific DI and SSI program rules considered to be work disincentives. The experimental impact study thus measures the incremental effects of case and referral management services. The eight demonstration sites were successful in implementing the experimental design roughly as planned. Project NetWork staff were able to recruit large numbers of participants and to provide rehabilitation and employment services on a substantial scale. Most of the sites easily reached their enrollment targets and were able to attract volunteers with demographic characteristics similar to those of the entire SSI and DI caseload and a broad range of moderate and severe disabilities. However, by many measures, volunteers were generally more "work-ready" than project eligible in the demonstration areas who did not volunteer to receive NetWork services. Project NetWork case management increased average annual earnings by $220 per year over the first 2 years following random assignment. This statistically significant impact, an approximate 11-percent increase in earnings, is based on administrative data on earnings. For about 70 percent of sample members, a third year of followup data was available. For this limited sample, the estimated effect of Project NetWork on annual earnings declined to roughly zero in the third followup year. The findings suggest that the increase in earnings may have been short-lived and may have disappeared by the time Project NetWork services ended. Project NetWork did not reduce reliance on SSI or DI benefits by statistically significant amounts over the 30-42 month followup period. The services provided by Project NetWork thus did not reduce overall SSI and DI caseloads or benefits by substantial amounts, especially given that only about 5 percent of the eligible caseload volunteered to participate in Project NetWork. Project NetWork produced modest net benefits to persons with disabilities and net costs to taxpayers. Persons with disabilities gained mainly because the increases in their earnings easily outweighed the small (if any) reduction in average SSI and DI benefits. For SSA and the federal government as a whole, the costs of Project NetWork were not sufficiently offset by increases in tax receipts resulting from increased earnings or reductions in average SSI and DI benefits. The modest net benefits of Project NetWork to persons with disabilities are encouraging. How such benefits of an experimental intervention should be weighed against costs of taxpayers depends on value judgments of policymakers. Because different case management projects involve different kinds of services, these results cannot be directly generalized to other case management interventions. They are nevertheless instructive for planning new initiatives. Combining case and referral management services with various other interventions, such as longer term financial support for work or altered provider incentives, could produc
NASA Astrophysics Data System (ADS)
1981-12-01
The planning procedures for the energy program and policy guidelines for energy planning are presented. Future changes in marginal costs and directions indicated for economically efficient pricing are assessed. The aim of the conservation program is to close the gap between the amounts of conservation which is rationally cost effective and that projected to occur anyway through normal market forces. An overview of energy demand and proposed plans for energy supply are given. Liquid fuels have priority although work on coal receives new emphasis. A better program on energy demand and management is suggested.
NASA Technical Reports Server (NTRS)
1981-01-01
The Kennedy Space Center (KSC) Management System for the Inertial Upper Stage (IUS) - spacecraft processing from KSC arrival through launch is described. The roles and responsibilities of the agencies and test team organizations involved in IUS-S/C processing at KSC for non-Department of Defense missions are described. Working relationships are defined with respect to documentation preparation, coordination and approval, schedule development and maintenance, test conduct and control, configuration management, quality control and safety. The policy regarding the use of spacecraft contractor test procedures, IUS contractor detailed operating procedures and KSC operations and maintenance instructions is defined. Review and approval requirements for each documentation system are described.
Revisit, revamp and revitalize your business plan: Part 4.
Waldron, David
2011-01-01
A best practice for all imaging leaders working on a management development program should be to invest enough time to complete a detailed planthatsetsgoals, objectives, step targets, landmarks, and a timetable for their achievements. Keys to success for a management development program include no surprises, active participation, and preparation by both the facilitator and the managers involved. A successful management team will have trained staff and lean processes mapped and documented, as well as be comfortable in a coaching, delegating, and consensus management style.
Management of technical date in Nihon Doro kodan
NASA Astrophysics Data System (ADS)
Hanada, Jun'ichi
Nihon Doro Kodan Laboratory has collected and contributed technical data (microfiches, aerial photographs, books and literature) on plans, designs, constructions and maintenance of the national expressways and the ordinary toll roads since 1968. This work is systematized on computer to retrieve and contribute data faster. Now Laboratory operates Technical Data Management System which manages all of technical data and Technical Document Management System which manages technical documents. These systems stand on users' on-line retrieval and data accumuration by microfiches and optical disks.
From resilience thinking to Resilience Planning: Lessons from practice.
Sellberg, M M; Ryan, P; Borgström, S T; Norström, A V; Peterson, G D
2018-07-01
Resilience thinking has frequently been proposed as an alternative to conventional natural resource management, but there are few studies of its applications in real-world settings. To address this gap, we synthesized experiences from practitioners that have applied a resilience thinking approach to strategic planning, called Resilience Planning, in regional natural resource management organizations in Australia. This case represents one of the most extensive and long-term applications of resilience thinking in the world today. We conducted semi-structured interviews with Resilience Planning practitioners from nine organizations and reviewed strategic planning documents to investigate: 1) the key contributions of the approach to their existing strategic planning, and 2) what enabled and hindered the practitioners in applying and embedding the new approach in their organizations. Our results reveal that Resilience Planning contributed to developing a social-ecological systems perspective, more adaptive and collaborative approaches to planning, and that it clarified management goals of desirable resource conditions. Applying Resilience Planning required translating resilience thinking to practice in each unique circumstance, while simultaneously creating support among staff, and engaging external actors. Embedding Resilience Planning within organizations implied starting and maintaining longer-term change processes that required sustained multi-level organizational support. We conclude by identifying four lessons for successfully applying and embedding resilience practice in an organization: 1) to connect internal "entrepreneurs" to "interpreters" and "networkers" who work across organizations, 2) to assess the opportunity context for resilience practice, 3) to ensure that resilience practice is a learning process that engages internal and external actors, and 4) to develop reflective strategies for managing complexity and uncertainty. Copyright © 2018 The Authors. Published by Elsevier Ltd.. All rights reserved.
Blake, Denise; Lyons, Antonia
2016-01-01
Opioid Substitution Treatment (OST) is a harm reduction strategy enabling opiate consumers to avoid withdrawal symptoms and maintain health and wellbeing. Some research shows that within a disaster context service disruptions and infrastructure damage affect OST services, including problems with accessibility, dosing, and scripts. Currently little is known about planning for OST in the reduction and response phases of a disaster. This study aimed to identify the views of three professional groups working in Aotearoa/New Zealand about OST provision following a disaster. In-depth, semi-structured interviews were conducted with 17 service workers, health professionals, and emergency managers in OST and disaster planning fields. Thematic analysis of transcripts identified three key themes, namely “health and wellbeing”, “developing an emergency management plan”, and “stock, dose verification, and scripts” which led to an overarching concept of “service continuity in OST preparedness planning”. Participants viewed service continuity as essential for reducing physical and psychological distress for OST clients, their families, and wider communities. Alcohol and drug and OST health professionals understood the specific needs of clients, while emergency managers discussed the need for sufficient preparedness planning to minimise harm. It is concluded that OST preparedness planning must be multidisciplinary, flexible, and inclusive. PMID:27834915
Oregon Works: Assessing the Worker Training and Work Organization Practices of Oregon Employers.
ERIC Educational Resources Information Center
Oregon State Economic Development Dept., Salem.
In 1992, questionnaires regarding the training and work organization practices were mailed to a random sample of 4,000 Oregon employers, and focus groups were held with 100 Oregon managers/employers. The main findings from the completed questionnaires (43% response rate) were as follows: most Oregon employers do not plan for training or treat it…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Childs, Allen B.
This Executive Summary provides an overview of the Draft Rainwater Wildlife Area Management Plan. The comprehensive plan can be viewed on the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) website at: www.umatilla.nsn.us or requested in hard copy from the CTUIR at the address below. The wildlife area was established in September 1998 when the CTUIR purchased the Rainwater Ranch through Bonneville Power Administration (BPA) for purposes of fish and wildlife mitigation for the McNary and John Day dams. The Management Plan has been developed under a standardized planning process developed by BPA for Columbia River Basin Wildlife Mitigation Projectsmore » (See Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus management actions and prioritize funding during the 2002-2006 planning period. Since acquisition of the property in late 1998, the CTUIR has conducted an extensive baseline resource assessment in preparation for the management plan, initiated habitat restoration in the Griffin Fork drainage to address road-related resource damage caused by roads constructed for forest practices and an extensive flood event in 1996, and initiated infrastructure developments associated with the Access and Travel Management Plan (i.e., installed parking areas, gates, and public information signs). In addition to these efforts, the CTUIR has worked to set up a long-term funding mechanism with BPA through the NPPC Fish and Wildlife Program. The CTUIR has also continued to coordinate closely with local and state government organizations to ensure consistency with local land use laws and maintain open lines of communication regarding important issues such as big game hunting, tribal member exercise of treaty rights, and public access. During the past two years, non-Indian public concern over big game hunting issues has at times overwhelmed other issues related to the wildlife area. In 2001, the CTUIR Fish and Wildlife Committee closed the wildlife area to tribal branch antlered bull elk harvest in response to harvest data that indicated harvest rates were greater than expected. In addition, illegal harvest of mature bull elk in southeastern Washington during the 2001 season exceeded the legal tribal and nontribal harvest combined which has created a potential significant regression in the bull;cow ratio in the Blue Mountain Elk herd. CTUIR Fish and Wildlife Committee and staff and Washington Department of Fish and Wildlife Regional Director and staff have been coordinating regularly to develop strategies to address harvest rates and ensure protection of viable big game herds in southeastern Washington. The CTUIR Fish and Wildlife Committee and WDFW has jointly agreed to continue close coordination on this and other issues and continue working together to ensure the long-term vigor of the elk herd on the Rainwater Wildlife Area. The purpose of the project is to protect, enhance, and mitigate fish and wildlife resources impacted by Columbia River Basin hydroelectric development. The effort is one of several wildlife mitigation projects in the region developed to compensate for terrestrial habitat losses resulting from the construction of McNary and John Day Hydroelectric facilities located on the mainstem Columbia River. While this project is driven primarily by the purpose and need to mitigate for wildlife habitat losses, it is also recognized that management strategies will also benefit many other non-target fish and wildlife species and associated natural resources.« less
Coffey, Michael; Cohen, Rachel; Faulkner, Alison; Hannigan, Ben; Simpson, Alan; Barlow, Sally
2017-06-01
Communication and information sharing are considered crucial to recovery-focused mental health services. Effective mental health care planning and coordination includes assessment and management of risk and safety. Using data from our cross-national mixed-method study of care planning and coordination, we examined what patients, family members and workers say about risk assessment and management and explored the contents of care plans. Thematic analysis of qualitative research interviews (n = 117) with patients, family members and workers, across four English and two Welsh National Health Service sites. Care plans were reviewed (n = 33) using a structured template. Participants have contrasting priorities in relation to risk. Patients see benefit in discussions about risk, but cast the process as a worker priority that may lead to loss of liberty. Relationships with workers are key to family members and patients; however, worker claims of involving people in the care planning process do not extend to risk assessment and management procedures for fear of causing upset. Workers locate risk as coming from the person rather than social or environmental factors, are risk averse and appear to prioritize the procedural aspects of assessment. Despite limitations, risk assessment is treated as legitimate work by professionals. Risk assessment practice operates as a type of fiction in which poor predictive ability and fear of consequences are accepted in the interests of normative certainty by all parties. As a consequence, risk adverse options are encouraged by workers and patients steered away from opportunities for ordinary risks thereby hindering the mobilization of their strengths and abilities. © 2016 The Authors. Health Expectations Published by John Wiley & Sons Ltd.
Modelling raw water quality: development of a drinking water management tool.
Kübeck, Ch; van Berk, W; Bergmann, A
2009-01-01
Ensuring future drinking water supply requires a tough management of groundwater resources. However, recent practices of economic resource control often does not involve aspects of the hydrogeochemical and geohydraulical groundwater system. In respect of analysing the available quantity and quality of future raw water, an effective resource management requires a full understanding of the hydrogeochemical and geohydraulical processes within the aquifer. For example, the knowledge of raw water quality development within the time helps to work out strategies of water treatment as well as planning finance resources. On the other hand, the effectiveness of planed measurements reducing the infiltration of harmful substances such as nitrate can be checked and optimized by using hydrogeochemical modelling. Thus, within the framework of the InnoNet program funded by Federal Ministry of Economics and Technology, a network of research institutes and water suppliers work in close cooperation developing a planning and management tool particularly oriented on water management problems. The tool involves an innovative material flux model that calculates the hydrogeochemical processes under consideration of the dynamics in agricultural land use. The program integrated graphical data evaluation is aligned on the needs of water suppliers.
Women in water management: the need for local planning.
Bhatt, M R
1995-08-01
This article on women's role in water resource management is based on a paper delivered at a seminar organized at the Water and Land Management Institute in Anand, India, in 1994. The article reflects Family Planning International's (FPI) experience in community-based water resource development. Most analyses of village and household water management data exclude women's role. The reasons are identified as the lack of inclusion of women's thinking in land-development research and planning, the dominance of males in planning and consequent male assumptions made about women's work and use of water, the lack of valuation of the nonmonetary nature of women's relationship to water, and the ease of ignoring women. Women's roles that are obstacles to inclusion in research and planning are identified as the lack of effective women's lobbies, the undervaluation by women of their work, and the lack of professional recognition of women as potential users of water or spokespersons for more than their own self-interests as women. National water policies are shifting to community-based management because local authorities are in daily contact with users, of whom about 50% are women. Historically national policy shifted from attention to distribution of investments in the water sector to reorganization of water agencies and to building up the capacity of private or voluntary agencies. The local context allows for more efficient and effective responses to local conditions. Local institutions and groups are better equipped to solicit local participation. One primary lesson learned by FPI is that local water resource planning is very important in strengthening the economic and individual capacity of poor people in underdeveloped areas. FPI's experience in Mahesana, Banaskantha, and Sabarkantha in Gujarat state supports this lesson learned. Water resource development policies resulted in mixed outcomes, and national control has been inefficient and disrespectful to local authorities. Another obstacle in Gujarat to water resource development is identified as increased demand for public water services and inadequate provision of services due to remoteness of the area and financial limitations of central agencies. Infrastructure is poorly maintained.
Quarterly report for the NGA FFCA project, April 1, 1994--June 30, 1994
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1994-12-31
Summaries of activities and agendas of meetings related to the National Governor`s Association (NGA) Federal Facilities Compliance Act (FFCA) project are presented. The objective of this project is the management of mixed radioactive and hazardous wastes. Activities included collection and review of state work plans, coordination with the National Association of Attorneys General to identify areas of overlap in working on DOE issues related to environmental management, and the writing of task force meeting summaries for distribution.
Infant Mortality and Asians and Pacific Islanders
... Minority Health at HHS Advisory Committee Committees and Working Groups News HHS Disparities Action Plan National Partnership for Action Campaigns and Initiatives Performance Improvement and Management System Report to Congress Knowledge ...
Infant Mortality and Native Hawaiians/Pacific Islanders
... Minority Health at HHS Advisory Committee Committees and Working Groups News HHS Disparities Action Plan National Partnership for Action Campaigns and Initiatives Performance Improvement and Management System Report to Congress Knowledge ...
Infant Mortality and American Indians/Alaska Natives
... Minority Health at HHS Advisory Committee Committees and Working Groups News HHS Disparities Action Plan National Partnership for Action Campaigns and Initiatives Performance Improvement and Management System Report to Congress Knowledge ...
Heart Disease and Asians and Pacific Islanders
... Minority Health at HHS Advisory Committee Committees and Working Groups News HHS Disparities Action Plan National Partnership for Action Campaigns and Initiatives Performance Improvement and Management System Report to Congress Knowledge ...
4 CFR 2.1 - Purpose, scope, and applicability.
Code of Federal Regulations, 2011 CFR
2011-01-01
... all who plan, direct, or supervise the work of employees. The objective of personnel management is to... treatment, motivation, compensation and productive utilization f employees. (b) Nothing in this regulation...
4 CFR 2.1 - Purpose, scope, and applicability.
Code of Federal Regulations, 2010 CFR
2010-01-01
... treatment, motivation, compensation and productive utilization f employees. (b) Nothing in this regulation... all who plan, direct, or supervise the work of employees. The objective of personnel management is to...
Human Factors and Modeling Methods in the Development of Control Room Modernization Concepts
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hugo, Jacques V.; Slay III, Lorenzo
nuclear power plants. Although the nuclear industry has made steady improvement in outage optimization, each day of a refueling outage still represents an opportunity to save millions of dollars and each day an outage extends past its planned end date represents millions of dollars that may have been spent unnecessarily. Reducing planned outage duration or preventing outage extensions requires careful management of the outage schedule as well as constant oversight and monitoring of work completion during the outage execution. During a typical outage, there are typically more than 10,000 activities on the schedule that, if not managed efficiently, may causemore » expensive outage delays. Management of outages currently relies largely on paper-based resources and general-purpose office software. A typical tool currently used to monitor work performance is a burn-down curve, where total remaining activities are plotted against the baseline schedule to track bulk work completion progress. While these tools are useful, there is still considerable uncertainty during a typical outage that bulk work progress is adequate and therefore a lot of management time is spent analyzing the situation on a daily basis. This paper describes recent advances made in developing a framework for the design of visual outage information presentation, as well as an overview of the scientific principles that informed the development of the visualizations. To test the utility of advanced visual outage information presentation, an outage management dashboard software application was created as part of the Department of Energy’s Advanced Outage Control Center project. This dashboard is intended to present all the critical information an outage manager would need to understand the current status of a refueling outage. The dashboard presents the critical path, bulk work performance, key performance indicators, outage milestones and metrics relating current performance to historical performance. Additionally, the dashboard includes data analysis tools to allow outage managers to drill down into the underlying data to understand the drivers of the indicators.« less
Improvement of Project Portfolio Management in an Information Technology Consulting Company
NASA Astrophysics Data System (ADS)
Kaewta, S.; Chutima, P.
2014-06-01
The scope of this research is to improve the efficiency of multiple project management in an information technology consulting company through the adaptation of the project portfolio management technique. The project management information system (PMIS) is implemented to establish effective communication channels so that internal and external teams as well as all relevant stakeholders can be employed to negotiate their work schedules. In addition, all activities created by multiple teams can be systematically reviewed and combined into a single checklist to be used as an agreed working plan for all team members. A general guideline for project portfolio management in information technology consulting companies is also proposed, which could results in a higher level of project on-time delivery.
NASA Astrophysics Data System (ADS)
Siuda, A. N.; Smythe, T. C.
2016-12-01
The Sargasso Sea, at the center of the North Atlantic gyre, is recognized by the United Nations Convention on Biological Diversity as a globally unique ecosystem threatened by anthropogenic activity. In its stewardship capacity, the Sargasso Sea Commission works within the current system of international organizations and treaties to secure protection for particular species or areas. Without a single governing authority to implement and enforce protective measures across the region, a coordinated management plan for the region is lacking. A research team comprised of 20 advanced undergraduate scientists participating in the spring 2015 SEA Semester: Marine Biodiversity and Conservation program of Sea Education Association (Woods Hole, MA) engaged in a groundbreaking simulated high seas marine spatial planning process resulting in A Marine Management Proposal for the Sargasso Sea. Based on natural and social science research, the interdisciplinary Proposal outlines goals, objectives and realistic strategies that encompass ecological, economic, human use, and future use considerations. Notably, the Proposal is the product of a classroom-based simulation intended to improve emerging scientists' understanding of how research is integrated into the policy process and how organizations work across disciplinary boundaries to address complex ocean management problems. Student researchers identified several discrete management areas and associated policy recommendations for those areas, as well as strategies for coordinated management across the entire Sargasso Sea region. The latter include establishment of a United Nations Regional Ocean Management Organization as well as provisions for monitoring and managing high seas traffic. To make progress toward these strategies, significant attention to the importance of high seas regions for global-scale conservation will be necessary.
NASA Astrophysics Data System (ADS)
Siuda, A. N.; Smythe, T. C.
2016-02-01
The Sargasso Sea, at the center of the North Atlantic gyre, is recognized by the United Nations Convention on Biological Diversity as a globally unique ecosystem threatened by anthropogenic activity. In its stewardship capacity, the Sargasso Sea Commission works within the current system of international organizations and treaties to secure protection for particular species or areas. Without a single governing authority to implement and enforce protective measures across the region, a coordinated management plan for the region is lacking. A research team comprised of 20 advanced undergraduate scientists participating in the spring 2015 SEA Semester: Marine Biodiversity and Conservation program of Sea Education Association (Woods Hole, MA) engaged in a groundbreaking simulated high seas marine spatial planning process resulting in A Marine Management Proposal for the Sargasso Sea. Based on natural and social science research, the interdisciplinary Proposal outlines goals, objectives and realistic strategies that encompass ecological, economic, human use, and future use considerations. Notably, the Proposal is the product of a classroom-based simulation intended to improve emerging scientists' understanding of how research is integrated into the policy process and how organizations work across disciplinary boundaries to address complex ocean management problems. Student researchers identified several discrete management areas and associated policy recommendations for those areas, as well as strategies for coordinated management across the entire Sargasso Sea region. The latter include establishment of a United Nations Regional Ocean Management Organization as well as provisions for monitoring and managing high seas traffic. To make progress toward these strategies, significant attention to the importance of high seas regions for global-scale conservation will be necessary.
HIPAA Business Associate Contracts: the value of contracts for case managers.
Muller, Lynn S
2003-01-01
Case Managers are in the middle of the upcoming HIPAA regulation changes, with the issuance of the Final Privacy Rule. Every case obliges case managers to work with Individually Identifiable Health Information (IIHI) and Protected Health Information (PHI). The purpose of this article is to provide case managers in all practice settings with a clear understanding of a "Business Associate," of a "Covered Entity," and of the specifics of a Business Associate Contract. This information will demonstrate how case managers can benefit from the use of these contracts in their business life. As an essential component of an organization's compliance plan, Business Associate Contracts can become a sword or a shield. This article is particularly helpful to case managers in independent practice, as well as those who work for Covered Entities.
Six-Month Results for the Kelly Air Force Base Compressed Work Week Survey
1993-07-01
plans to continue the CWS past the 1-year original plan. REFERENCES 1. Balch, B.W. The four day week and the older workers. Personnel Journal, 394-396...8217 perceptions of the four - day week . California Management Review, 28, 31-35, 1975. 15. Mills, M.E. Core-12: A controlled study of the impact of 12 hour scheduling
ERIC Educational Resources Information Center
Cripe, Dennis
1998-01-01
Considers two very different fictional high school newspaper editorships to see how the "maestro" process works. Notes that the process is a management technique similar to brainstorming but in which one person keeps the planning meeting focused. Suggests that the effective maestro asks writers, photographers, and designers to trade places with…
Labor of love. A model for planning human resource needs.
Brady, F J
1989-01-01
Typically, the annual budgeting process is the hospital's only attempt to forecast human resource requirements. In times of rapid change, this traditional ad hoc approach is incapable of satisfying either the Catholic hospital's ethical obligations as an employer or its responsibilities to provide healthcare to the poor and suffering. Assumptions about future activity, including volume projections on admissions, patient days, and other services, influence the budgeting process to a large degree. Because the amount of work to be done and the number of employees required to do it are related, changes in demand for service immediately and directly affect staffing requirements. A hospital cannot achieve ethical human resource management or provide high-quality healthcare if inadequate planning forces management into a cycle of crisis-coping--reacting to this year's nursing shortage with a major recruiting effort and next year's financial crunch with a traumatic reduction in force. The human resource planning approach outlined here helps the hospital meet legitimate business needs while satisfying its ethical obligations. The model has four phases and covers a charge to the planning committee; committee appointments; announcements; the establishment of ground rules, focus, and task forces; and the work of each task force.
Logistic Principles Application for Managing the Extraction and Transportation of Solid Minerals
NASA Astrophysics Data System (ADS)
Tyurin, Alexey
2017-11-01
Reducing the cost of resources in solid mineral extraction is an urgent task. For its solution the article proposes logistic approach use to management of mining company all resources, including extraction processes, transport, mineral handling and storage. The account of the uneven operation of mining, transport units and complexes for processing and loading coal into railroad cars allows you to identify the shortcomings in the work of the entire enterprise and reduce resources use at the planned production level. In the article the mining planning model taking into account the dynamics of the production, transport stations and export coal to consumers rail transport on example of Krasnoyarsk region Nazarovo JSC «Razrez Sereul'skiy». Rolling planning methods use and data aggregation allows you to split the planning horizon (month) on equal periods and to use of dynamic programming method for building mining optimal production programme for the month. Coal mining production program definition technique will help align the work of all enterprise units, to optimize resources of all areas, to establish a flexible relationship between manufacturer and consumer, to take into account the irregularity of rail transport.
Center Planning and Development Student Engineer at KSC
NASA Technical Reports Server (NTRS)
Jenkins, Kenneth T., Jr.
2015-01-01
This summer I was the Student Trainee (Engineering) Pathways Intern (co-op) at the Kennedy Space Center (KSC) in the Center Planning & Development (CPD) Directorate. CPD works with commercial companies who are interested in using KSC's unique capabilities for spaceflight, spacecraft processing, ground systems and Research & Development (R&D) projects that fall in line with NASA's Mission and Vision. CPD is divided into three (3) groups: (1) AD-A, which works on the Master Planning for the center, (2) AD-B (where I am), which works on project control, management and integration, and (3) AD-C, which works on partnership development. CPD's main goal is to make KSC the world's preeminent multi-user spaceport and maintain the center as a leader in space exploration. CPD is a very diverse group of employees having a wide knowledge of not only the Space Shuttle, but also Expendable Launch Vehicles (ELV). The director of CPD, Scott Colloredo, is on the advisory board for Commercial Space Operations (CSO) and has a degree from ERAU. I worked on a number of different tasks for AD-B, as well as CPD, that includes, but not limited to: reviewing and reissuing engineering documents, weekly notes for CPD and senior management, engineering familiarizations with facilities at KSC, leading a tour for the Embry-Riddle Aeronautical University Career Services office, and working on actual agreements/proposals that will be used in the partnership process with multiple partners, along with other projects. Most of the work I have done is sensitive information and cannot be disclosed.
Total Quality Management Implementation Plan Defense Depot Memphis
1989-07-01
W.ungilon. 0 t :0.O. )RT DATE 3. REPORT TYPE AND DATES COVERED I July 1989 _ 4. TITLE AND SUBTITLE 5. FUNDING NUMBERS Total Quality Management Implementation...improvement goals, implementation strategy and milestones. 6’ SEP 291989 /; ELECTE i= E 14. SUBJECT TERMS 15. NUMBER OF PAGES TQM (Total Quality Management ), Depot...changing work environment where change is the norm. We are talking about changes in attitudes and habits. Total Quality Management is not a panacea
Software Schedules Missions, Aids Project Management
NASA Technical Reports Server (NTRS)
2008-01-01
NASA missions require advanced planning, scheduling, and management, and the Space Agency has worked extensively to develop the programs and software suites necessary to facilitate these complex missions. These enormously intricate undertakings have hundreds of active components that need constant management and monitoring. It is no surprise, then, that the software developed for these tasks is often applicable in other high-stress, complex environments, like in government or industrial settings. NASA work over the past few years has resulted in a handful of new scheduling, knowledge-management, and research tools developed under contract with one of NASA s partners. These tools have the unique responsibility of supporting NASA missions, but they are also finding uses outside of the Space Program.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-08-01
The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S and M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S and M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, andmore » the technical approach for the project. A companion document, the EFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of EFDP Facilities was initiated in FY 1994 and will be completed in FY 2000. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $51M. The costs are summarized. Upon completion of deactivation, annual S and M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year.« less
Mass casualty events: blood transfusion emergency preparedness across the continuum of care.
Doughty, Heidi; Glasgow, Simon; Kristoffersen, Einar
2016-04-01
Transfusion support is a key enabler to the response to mass casualty events (MCEs). Transfusion demand and capability planning should be an integrated part of the medical planning process for emergency system preparedness. Historical reviews have recently supported demand planning for MCEs and mass gatherings; however, computer modeling offers greater insights for resource management. The challenge remains balancing demand and supply especially the demand for universal components such as group O red blood cells. The current prehospital and hospital capability has benefited from investment in the management of massive hemorrhage. The management of massive hemorrhage should address both hemorrhage control and hemostatic support. Labile blood components cannot be stockpiled and a large surge in demand is a challenge for transfusion providers. The use of blood components may need to be triaged and demand managed. Two contrasting models of transfusion planning for MCEs are described. Both illustrate an integrated approach to preparedness where blood transfusion services work closely with health care providers and the donor community. Preparedness includes appropriate stock management and resupply from other centers. However, the introduction of alternative transfusion products, transfusion triage, and the greater use of an emergency donor panel to provide whole blood may permit greater resilience. © 2016 AABB.
Management of medical technology: case study of a major acute hospital.
Brown, Ian; Smale, Andrew
2007-01-01
This paper presents results of a Capital Equipment Management Plan undertaken at a major acute hospital in Australia. By classifying existing equipment using a threshold replacement value into Major and Minor items, detailed planning information was collected for 527 items of Major equipment representing 80% of the hospital's total equipment stock. A number of meaningful views of this significant asset base are presented, and a prioritisation method used to provide recommendations for future equipment replacement and acquisition for a 5 year planning period. The survey work to identify and document actual equipment items provides a convincing argument for the funding levels required for capital equipment replacement and acquisition, and evidence for the extent of technology reliance in modern health care facilities.
An Interval Type-2 Fuzzy Multiple Echelon Supply Chain Model
NASA Astrophysics Data System (ADS)
Miller, Simon; John, Robert
Planning resources for a supply chain is a major factor determining its success or failure. In this paper we build on previous work introducing an Interval Type-2 Fuzzy Logic model of a multiple echelon supply chain. It is believed that the additional degree of uncertainty provided by Interval Type-2 Fuzzy Logic will allow for better representation of the uncertainty and vagueness present in resource planning models. First, the subject of Supply Chain Management is introduced, then some background is given on related work using Type-1 Fuzzy Logic. A description of the Interval Type-2 Fuzzy model is given, and a test scenario detailed. A Genetic Algorithm uses the model to search for a near-optimal plan for the scenario. A discussion of the results follows, along with conclusions and details of intended further work.
Chronic Liver Disease and Asian Americans/Pacific Islanders
... Minority Health at HHS Advisory Committee Committees and Working Groups News HHS Disparities Action Plan National Partnership for Action Campaigns and Initiatives Performance Improvement and Management System Report to Congress Knowledge ...
Chronic Liver Disease and Native Hawaiian/Pacific Islanders
... Minority Health at HHS Advisory Committee Committees and Working Groups News HHS Disparities Action Plan National Partnership for Action Campaigns and Initiatives Performance Improvement and Management System Report to Congress Knowledge ...
Organizational ergonomics of occupational health methods and processes in a Brazilian oil refinery.
Bau, Lucy M S; Farias, Jean P; Buso, Sandro A; Passero, Carolina R Marcon
2012-01-01
Organizational ergonomics refers to the optimization of social technical systems, including their organizational structures, policies and processes. The relevant topics include communications, management of resources, work projects, temporal organization of work, team work, participative project, new work paradigms, cooperative work, organizational culture, network organizations and quality management (IEA, 2000). The purpose of this study was the reorganization of the methods and processes of the occupational health sector (SMS/SO - Portuguese acronym of the area) of a petrochemical company. The work involved thirty professionals: a coordinator, two occupational physicians, one cardiologist, one occupational dentist, two occupational nurses, eleven occupational health technicians, one social worker, one nutritionist, one phonoaudiologist, one ophthalmologist, one biochemist, two ergonomists, three administrative assistants, one administrator and one psychologist, during a six-month period. The methodology that was used sought to establish a cooperative alliance focused on change, transformation and acquisition of skills, reflecting directly on the attitudes and performance of the leaderships and their work teams. In addition to the feedback practice, the following supporting tools were used for the study's success: "Functional Polyvalence Matrix", "Management of Failures", 5W2H", "6M", "5 Why" and "process mapping". The intended results after the organization ergonomics restructuring process will allow the leader to help his or her team to make a diagnosis of the problems, identify options, develop strategies, establish targets and action plans, remove barriers, review contexts and implement the business management fundaments: planning, organization, management, coordination and control. The transformation possibilities allow us to consider some hypothesis: Before: Focus only on results. After: Engage collaborators to create sustainable results. Before: Operating profile. After: Tactical/strategic profile. Before: Find errors. After: Value effort and development. Before: Listen to what is being said. After: Understand what is being said. Before: Create fears of the consequences. After: Create room for risk. Before: Be the one who approves and decides. After: Be the cooperative support.
Marsh management plans in practice: Do they work in coastal Louisiana, USA?
NASA Astrophysics Data System (ADS)
Cowan, James H.; Turner, R. Eugene; Cahoon, Donald R.
1988-01-01
Louisiana's coastal wetlands represent about 41% of the nation's total and are extensively managed for fish, fur, and waterfowl. Marsh management plans (MMPs) are currently used to avoid potential user conflicts and are believed to be a best management practice for specific management goals. In this article, we define MMPs and examine their variety, history, impacts, and future. A MMP is an organized written plan submitted to state and federal permitting agencies for approval and whose purpose is to regulate wetland habitat quantity and quality (control land loss and enhance productivity). MMPs are usually implemented by making structural modifications in the marsh, primarily by using a variety of water control structures in levees to impound or semi-impound managed areas. It appears that MMPs using impoundments are only marginally successful in achieving and often contradict management goals. Although 20% of coastal Louisiana may be in MMPs by the year 2000, conflict resolution of public and private goals is compromised by a surfeit of opinion and dearth of data and experience. Based on interpretation of these results, we believe the next phase of management should include scientific studies of actual impacts, utilization of post-construction monitoring data, inventory of existing MMPs, development of new techniques, and determination of cumulative impacts.
SU-F-P-03: Management of Time to Treatment Inititation: Case for An Electronic Whiteboard
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adnani, N
2016-06-15
Purpose: To determine if data mining of an electronic whiteboard improves the management of the Time to Treatment Initiation (TTI) in radiation oncology. Methods: An electronic whiteboard designed to help in managing the planning workflow and improves communication regarding patient planning progress was used to record the dates at which each phase of the planning process began or completed. These are CT Sim date, Plan Start, Physician Review, Physicist Review, Approval for Treatment Delivery, Setup or Verification of Simulation. Results: During clinical implementation, the electronic whiteboard was able to fulfill its primary objective of providing a transparent account of themore » planning progress of each patient. Peer pressure also meant that individual tasks, such as contouring, were easily brought to the attention of the responsible party and prioritized accordingly. Data mining to analyze the electronic whiteboard per patient (figure 1), per diagnosis (figure 2), per treatment modality (figure 3), per physician (figure 4), per planner (figure 5), etc., added another sophisticated tool in the management of Time to Treatment Initiation without compromising quality of the plans being generated. A longer than necessary time between CT Sim and Plan Start can be discussed among the members of the treatment team as an indication of inadequate/outdated CT Simulator, Contouring Tools, Image Fusion Tools, Other Imaging Studies (MRI, PET/CT) performed, etc. The same for the Plan Start to Physician Review where an extended time than expected may be due unrealistic planning goals, limited planning system features, etc. Conclusion: An Electronic Whiteboard in radiation oncology is not only helping with organizing planning workflow, it is also a potent tool that can be used to reduce the Time to Treatment Initiation by providing the clinic with hard data about the duration of each phase treatment planning as a function of different variable affecting the planning process. The work is supported by the Global Medical Physics Institute.« less
Durand, Marie-José; Corbière, Marc; Coutu, Marie-France; Reinharz, Daniel; Albert, Valérie
2014-01-01
Workplace absenteeism is still a curse for developed countries, and more systematic practices need to be adopted to address this issue. To review the literature on best practices for managing work absences related to musculoskeletal or common mental disorders. A review was conducted by performing a search in bibliographic databases and on work-disability research institute websites. Recommendations regarding work-absence management and return-to-work practices were extracted from all the retained documents and organized within a chronological framework. In total, 17 documents were analyzed, leading to identification of common work-absence management and return-to-work practices, the importance of a worker support approach, and recommended roles and responsibilities for stakeholders. These practices were then integrated into a six-step process: (1) time off and recovery period; (2) initial contact with the worker; (3) evaluation of the worker and his job tasks; (4) development of a return-to-work plan with accommodations; (5) work resumption, and (6) follow-up of the return-to-work process. Based on this review, we constructed a comprehensive work-absence management and return-to-work process designed to assist organizations. Our results indicate that such a process must be included within a broader policy of health promotion and job retention. Adaptations will be required for implementation in the workplace.
Patient safety culture in hospitals within the nursing perspective.
Toso, Greice Letícia; Golle, Lidiane; Magnago, Tânia Solange Bosi de Souza; Herr, Gerli Elenise Gehrke; Loro, Marli Maria; Aozane, Fabiele; Kolankiewicz, Adriane Cristina Bernat
2016-12-15
Evaluate the atmosphere regarding patient safety from the perspective of active nurses in hospitals in a country town of Rio Grande do Sul State. Cross-sectional study with 637 nursing professionals from two hospitals. Data collection through Safety Attitudes Questionnaire, in the second half of 2014. Cutoff for positive assessment was ≥75 points. The scores for domains in the overall assessment were: 76 (team work atmosphere), 73 (safety atmosphere), 88 (job satisfaction), 59 (perceived stress), 66 (perception of unit management), 65 (perception of hospital management) and 80 (work conditions). When comparing averages between institutions, the private institution showed better working conditions. Results can be used to plan and organize actions, given the low scores in relation to the safety atmosphere, management and stress perception.
Strengthening Connections between Dendrohydrology and Water Management in the Mediterranean Basin
NASA Astrophysics Data System (ADS)
Touchan, R.; Freitas, R. J.
2017-12-01
Dendrochronology can provide the knowledge upon which to base sound decisions for water resources. In general, water managers are limited to using short continuous instrumental records for forecasting streamflows and reservoir levels. Longer hydrological records are required. Proxy data such as annual tree-ring growth provide us with knowledge of the past frequency and severity of climatic anomalies, such as drought and wet periods, and can be used to improve probability calculations of future events. By improving probability input to these plans, water managers can use this information for water allocations, water conservation measures, and water efficiency methods. Accurate planning is critical in water deficit regions with histories of conflict over land and limited water. Here, we link the science of dendrohydrology with water management, and identify appropriate forums for scientists, policy decision makers, and water managers to collaborate in translating science into effective actions anticipating extreme events, such drought or floods. We will present examples of several dendrohydrological reconstructions from the eastern Mediterranean and North Africa as input for water management plans. Different disciplines are needed to work together, and we identify possible mechanisms to collaborate in order to reach this crucial necessity to use scarce water wisely.
Mother's home healthcare: emotion work when a child has cancer.
Clarke, Juanne N
2006-01-01
Home healthcare work, involving physical labor, nursing care, medical monitoring, administrative, planning and accounting, advocacy and emotion work, is unpaid and largely invisible. This article, based on focus group interviews with mothers whose children have had cancer, describes one part of their home healthcare labor, their emotion work. Specifically, it examines how mothers: manage the moral imperatives of mothering; think about and try to manage the strong feelings, particularly of fear and uncertainty that they often have when their children are ill with cancer; work to understand and maintain their marital relationships; the strategies that seemed to help; and finally, the self-transformation that many mothers experience. The article concludes with a discussion of the substantive, theoretical, research, and policy implications of emotion work in the provision of home healthcare work.
NASA Astrophysics Data System (ADS)
Haltigin, T.; Lange, C.; Mugnuolo, R.; Smith, C.
2018-04-01
This paper summarizes the findings and recommendations of the International Mars Architecture for the Return of Samples (iMARS) Phase II Working Group, an international team comprising 38 members from 16 countries and agencies.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-11
... enforcement activities for oil and gas leases in their jurisdiction. The States and Indian Tribes are working... also must provide periodic accounting documentation to ONRR, including an annual work plan and... Tribes. Estimated Annual Reporting and Recordkeeping ``Hour'' Burden: 5,519 hours. We have not included...
Work management plan for data systems and analysis directorate
NASA Technical Reports Server (NTRS)
Nichols, L. R.
1979-01-01
A contract with the Data Systems and Analysis Directorate contains a specified level of resources related to a specific set of work in support of three divisions within the Data Systems and Analysis Directorate. The divisions are Institutional Data Systems Division, Ground Data Systems Division, and Mission Planning and Analysis Division. The Statement of work defines at a functional requirements level the type of support to be provided to the three divisions. The contract provides for further technical direction to the contractor through issuance of Job Orders. The Job order is the prime method of further defining the work to be done, allocating a portion of the total resources in the contract to the defined tasks, and further delegating technical responsibility.
77 FR 48131 - Environmental Management Site-Specific Advisory Board, Hanford
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-13
...: Red Lion Hotel, 1101 North Columbia Center Boulevard, Kennewick, WA 99336. FOR FURTHER INFORMATION... Priorities and HAB Work Plan Priorities 2013 HAB Meeting Calendar Board Business [cir] HAB Budget [cir...
Jeffrey D. Kline; Paul Thiers; Connie P. Ozawa; J. Alan Yeakley; Sean N. Gordon
2014-01-01
We examine land use planning outcomes over a 30-year period in the Portland, OR-Vancouver, WA (USA) metropolitan area. The four-county study region enables comparisons between three Oregon counties subject to Oregonâs 1973 Land Use Act (Senate Bill 100) and Clark County, WA which implemented land use planning under Washingtonâs 1990 Growth Management Act. We describe...