Code of Federal Regulations, 2011 CFR
2011-04-01
... and subrecipients in a work program, or other document that describes the work to be accomplished... various combinations, or brought together as a single work program. The expenditure of PL funds for transportation planning outside of metropolitan planning areas under § 420.109(d) may be included in the work...
Social Work Assessment Notes: A Comprehensive Outcomes-Based Hospice Documentation System.
Hansen, Angela Gregory; Martin, Ellen; Jones, Barbara L; Pomeroy, Elizabeth C
2015-08-01
This article describes the development of an integrated psychosocial patient and caregiver assessment and plan of care for hospice social work documentation. A team of hospice social workers developed the Social Work Assessment Notes as a quality improvement project in collaboration with the information technology department. Using the Social Work Assessment Tool as an organizing framework, this comprehensive hospice social work documentation system is designed to integrate assessment, planning, and outcomes measurement. The system was developed to guide the assessment of patients' and caregivers' needs related to end-of-life psychosocial issues, to facilitate collaborative care plan development, and to measure patient- and family-centered outcomes. Goals established with the patient and the caregiver are documented in the plan of care and become the foundation for patient-centered, strengths-based interventions. Likert scales are used to assign numerical severity levels for identified issues and progress made toward goals and to track the outcome of social work interventions across nine psychosocial constructs. The documentation system was developed for use in an electronic health record but can be used for paper charting. Future plans include automated aggregate outcomes measurement to identify the most effective interventions and best practices in end-of-life care.
Corridor Planning And Feasibility Analysis Corridor, Master Plan
DOT National Transportation Integrated Search
1996-04-01
THE I-70 RURAL IVHS CORRIDOR MASTER PLAN IS THE GUIDANCE DOCUMENT FOR DEPLOYMENT OF THE INTELLIGENT TRANSPORTATION SYSTEM (ITS) FOR THE INTERSTATE-70 CORRIDOR FROM DENVER TO GLENWOOD SPRINGS, COLORADO. AS A WORKING DOCUMENT, THE PLAN RECOMMENDS STRAT...
45 CFR 261.61 - How must a State document a work-eligible individual's hours of participation?
Code of Federal Regulations, 2010 CFR
2010-10-01
... individual who is self-employed, the documentation must comport with standards set forth in the State's approved Work Verification Plan. Self-reporting by a participant without additional verification is not... case file. In accordance with § 261.62, a State must describe in its Work Verification Plan the...
AI-MSG modification work plan. [LMFBR
DOE Office of Scientific and Technical Information (OSTI.GOV)
Page, J.P.
1973-08-20
This document contains the Work Plan for the modification of the AI Steam Generator for tests in Large Leak Test Rig. This Work Plan describes the objectives, scope of work, schedule and manpower, end items, and meetings and reports required for the modification.
Documenting Living Monuments in Indonesia: Methodology for Sustainable Utility
NASA Astrophysics Data System (ADS)
Suryaningsih, F.; Purwestri, N.
2013-07-01
The systematic documentation of cultural heritage in Indonesia has been developed after the establishment of Bataviaasch Genootschap van Kunsten en Wetenschappen (1778) and De Oudheidkundige Dienst (1913) by the Netherlands Indies government. After Indonesian independent, the tasks of cultural heritage documentation take over by The Ministry of Culture (now become The Ministry of Education of Culture) with focus on the ancient and classical heritage, so called dead monument. The needed of comprehensive documentation data regarding cultural heritage become significant issues since the government and private sector pay attention to the preservation of heritage building in the urban site, so called living monument. The archives of original drawing plan many times do not fit with the existing condition, while the conservation plan demands a document such as built drawing plan to work on. The technology, methodology and system to provide such comprehensive document of heritage building and site become important, to produce good conservation plan and heritage building regular maintenance. It means the products will have a sustainable and various utility values. Since 1994, Documentation Centre for Architecture - Indonesia (PDA), has established to meet the needs of a comprehensive data of heritage building (living monuments), to utilized as basic document for conservation planning. Not only provide document of the digital drawing such site plan, plan, elevation, section and details of architecture elements, but also document of historic research, material analysis and completed with diagnosis and mapping of building damages. This manuscript is about PDA field experience, working in this subject issue
UPWP Unified Planning Work Program
DOT National Transportation Integrated Search
1995-05-01
The Unified Plannrng Work Program (UPWP) iS the planning document that guides the MPO staff in fulfilling its planning responstbilities for the upcoming year. Comprised of tasks that can be changed as the planning needs change. It is intended to serv...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan formore » the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.« less
ERIC Educational Resources Information Center
United Nations Educational, Scientific, and Cultural Organization, Bangkok (Thailand). Regional Office for Education in Asia and the Pacific.
This document is a work plan for the UNESCO Asia and the Pacific Programme of Educational Innovation for Development (APEID) for the period 1992 through 1996. The plan provides a general framework for APEID, including a formulation of annual schedules of activities with due regard to available resources and funding. The document discusses three…
Request for Correction 15003 - Information Quality Act request for Correction of the TSCA Work Plan
This RFC concerns the Information Quality Act request for correction of the TSCA Work Plan for Chemical Assessments: 20154 Update and the TSCA Work Plan Chemicals: Methods Document (February 2012) regarding assessment of phthalic anhydride
The Technical Work Plan Tracking Tool
NASA Technical Reports Server (NTRS)
Chullen, Cinda; Leighton, Adele; Weller, Richard A.; Woodfill, Jared; Parkman, William E.; Ellis, Glenn L.; Wilson, Marilyn M.
2003-01-01
The Technical Work Plan Tracking Tool is a web-based application that enables interactive communication and approval of contract requirements that pertain to the administration of the Science, Engineering, Analysis, and Test (SEAT) contract at Johnson Space Center. The implementation of the application has (1) shortened the Technical Work Plan approval process, (2) facilitated writing and documenting requirements in a performance-based environment with associated surveillance plans, (3) simplified the contractor s estimate of the cost for the required work, and (4) allowed for the contractor to document how they plan to accomplish the work. The application is accessible to over 300 designated NASA and contractor employees via two Web sites. For each employee, the application regulates access according to the employee s authority to enter, view, and/or print out diverse information, including reports, work plans, purchase orders, and financial data. Advanced features of this application include on-line approval capability, automatic e-mail notifications requesting review by subsequent approvers, and security inside and outside the firewall.
20 CFR 411.450 - What is an Individual Work Plan?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 20 Employees' Benefits 2 2011-04-01 2011-04-01 false What is an Individual Work Plan? 411.450 Section 411.450 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE TICKET TO WORK AND SELF-SUFFICIENCY... work plan (IWP) is a required written document signed by an employment network (EN) (other than a State...
20 CFR 411.450 - What is an Individual Work Plan?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false What is an Individual Work Plan? 411.450 Section 411.450 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE TICKET TO WORK AND SELF-SUFFICIENCY... work plan (IWP) is a required written document signed by an employment network (EN) (other than a State...
Tank waste remediation system configuration management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vann, J.M.
The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Projectmore » personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.« less
Transportation Planning and Research : ANNUAL WORK PROGRAM AND COST ESTIMATE, 2018
DOT National Transportation Integrated Search
2018-01-01
This document is the section-by-section ANNUAL WORK PROGRAM AND COST ESTIMATE for the agency whose MISSION is to provide excellence in transportation planning through an inclusive and comprehensive planning process that provides products, services, a...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant, C W; Lenderman, J S; Gansemer, J D
This document is an update to the 'ADIS Algorithm Evaluation Project Plan' specified in the Statement of Work for the US-VISIT Identity Matching Algorithm Evaluation Program, as deliverable II.D.1. The original plan was delivered in August 2010. This document modifies the plan to reflect modified deliverables reflecting delays in obtaining a database refresh. This document describes the revised schedule of the program deliverables. The detailed description of the processes used, the statistical analysis processes and the results of the statistical analysis will be described fully in the program deliverables. The US-VISIT Identity Matching Algorithm Evaluation Program is work performed bymore » Lawrence Livermore National Laboratory (LLNL) under IAA HSHQVT-07-X-00002 P00004 from the Department of Homeland Security (DHS).« less
Creating Your Life's Work Portfolio. An Interactive Career and Life Planning Workbook.
ERIC Educational Resources Information Center
1998
Designed for those beginning a working life or with years of experience, this book leads the user through collecting records that document work history and affirm successes. It provides a step-by-step process to help plan one's life's work, make career decisions, and develop plans for new career directions and a structure to learn career planning…
48 CFR 970.1100-1 - Performance-based contracting.
Code of Federal Regulations, 2012 CFR
2012-10-01
... methods of accomplishing the work; use measurable (i.e., terms of quality, timeliness, quantity) performance standards and objectives and quality assurance surveillance plans; provide performance incentives... work and other documents used to establish work requirements. (d) Quality assurance surveillance plans...
48 CFR 970.1100-1 - Performance-based contracting.
Code of Federal Regulations, 2014 CFR
2014-10-01
... methods of accomplishing the work; use measurable (i.e., terms of quality, timeliness, quantity) performance standards and objectives and quality assurance surveillance plans; provide performance incentives... work and other documents used to establish work requirements. (d) Quality assurance surveillance plans...
48 CFR 970.1100-1 - Performance-based contracting.
Code of Federal Regulations, 2013 CFR
2013-10-01
... methods of accomplishing the work; use measurable (i.e., terms of quality, timeliness, quantity) performance standards and objectives and quality assurance surveillance plans; provide performance incentives... work and other documents used to establish work requirements. (d) Quality assurance surveillance plans...
Response to Comments for DCM Work Plan Risk Assessment
This document summarizes the public and external peer review comments that the EPA’s Office of Pollution Prevention and Toxics (OPPT) received for the draft work plan risk assessment for dichloromethane (DCM).
B Plant Complex preclosure work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
ADLER, J.G.
1999-02-02
This preclosure work plan describes the condition of the dangerous waste treatment storage, and/or disposal (TSD) unit after completion of the B Plant Complex decommissioning Transition Phase preclosure activities. This description includes waste characteristics, waste types, locations, and associated hazards. The goal to be met by the Transition Phase preclosure activities is to place the TSD unit into a safe and environmentally secure condition for the long-term Surveillance and Maintenance (S&M) Phase of the facility decommissioning process. This preclosure work plan has been prepared in accordance with Section 8.0 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement)more » (Ecology et al. 1996). The preclosure work plan is one of three critical Transition Phase documents, the other two being: B Plant End Points Document (WHC-SD-WM-TPP-054) and B Plant S&M plan. These documents are prepared by the U.S. Department of Energy, Richland Operations Office (DOE-RL) and its contractors with the involvement of Washington State Department of Ecology (Ecology). The tanks and vessels addressed by this preclosure work plan are limited to those tanks end vessels included on the B Plant Complex Part A, Form 3, Permit Application (DOE/RL-88-21). The criteria for determining which tanks or vessels are in the Part A, Form 3, are discussed in the following. The closure plan for the TSD unit will not be prepared until the Disposition Phase of the facility decommissioning process is initiated, which follows the long-term S&M Phase. Final closure will occur during the Disposition Phase of the facility decommissioning process. The Waste Encapsulation Storage Facility (WESF) is excluded from the scope of this preclosure work plan.« less
48 CFR 333.104 - Protests to GAO.
Code of Federal Regulations, 2010 CFR
2010-10-01
... a stop work order has been issued.) (I) A copy of any mutual agreement to suspend work on a no-cost... determination. (N) The acquisition plan, source selection plan, and the source selection decision document. (O...
48 CFR 333.104 - Protests to GAO.
Code of Federal Regulations, 2011 CFR
2011-10-01
... a stop work order has been issued.) (I) A copy of any mutual agreement to suspend work on a no-cost... determination. (N) The acquisition plan, source selection plan, and the source selection decision document. (O...
Family Planning in Five Continents: Africa, America, Asia, Europe, Oceania. November 1975 Update.
ERIC Educational Resources Information Center
International Planned Parenthood Federation, London (England).
This document gives highlights of the family planning situation in countries of the world, together with basic demographic statistics. Its purpose is to provide a quick reference source for those who work in family planning, population, and other related fields. Following a brief history of the pioneering work in family planning, population…
Bay Delta Conservation Plan / California WaterFix Documents
EPA is working with state and federal agencies on development of the Bay Delta Conservation Plan (BDCP), a habitat conservation plan. This page contains correspondence commenting on BDCP planning by state and federal agencies.
Responses to Comments for N-Methylpyrrolidone (NMP) Work Plan Risk Assessment
This document summarizes the public and external peer review comments that the EPA’s Office of Pollution Prevention and Toxics (OPPT) received for the draft work plan risk assessment for n-Methylpyrrolidone (NMP).
40 CFR 35.2050 - Effect of approval or certification of documents.
Code of Federal Regulations, 2010 CFR
2010-07-01
... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2050 Effect of approval or certification of documents. Review or approval of facilities plans, design drawings... relieve the grantee of its responsibility to properly plan, design, build and effectively operate and...
Planning documents: a business planning strategy.
Kaehrle, P A
2000-06-01
Strategic planning and business plan development are essential nursing management skills in today's competitive, fast paced, continually changing health care environment. Even in times of great uncertainty, nurse managers need to plan and forecast for the future. A well-written business plan allows nurse managers to communicate their expertise and proactively contribute to the programmatic decisions and changes occurring within their patient population or service area. This article presents the use of planning documents as a practical, strategic business planning strategy. Although the model addresses orthopedic services specifically, nurse managers can gain an understanding and working knowledge of planning concepts that can be applied to all patient populations.
NASA Technical Reports Server (NTRS)
Nichol, Janet; King, Bruce; Xiaoli, Ding; Dowman, Ian; Quattrochi, Dale; Ehlers, Manfred
2007-01-01
A policy document on earth observation for urban planning and management resulting from a workshop held in Hong Kong in November 2006 is presented. The aim of the workshop was to provide a forum for researchers and scientists specializing in earth observation to interact with practitioners working in different aspects of city planning, in a complex and dynamic city, Hong Kong. A summary of the current state of the art, limitations, and recommendations for the use of earth observation in urban areas is presented here as a policy document.
NASA Technical Reports Server (NTRS)
2005-01-01
The purpose of this document is to identify the general flight/mission planning requirements for same-day file-and-fly access to the NAS for both civil and military High-Altitude Long Endurance (HALE) Unmanned Aircraft System (UAS). Currently the scope of this document is limited to Step 1, operations above flight level 43,000 feet (FL430). This document describes the current applicable mission planning requirements and procedures for both manned and unmanned aircraft and addresses HALE UAS flight planning considerations in the future National Airspace System (NAS). It also discusses the unique performance and operational capabilities of HALE UAS associated with the Access 5 Project, presents some of the projected performance characteristics and conceptual missions for future systems, and provides detailed analysis of the recommended mission planning elements for operating HALE UAS in the NAS.
NASA Astrophysics Data System (ADS)
Osipenkova, Irina; Simankina, Tatyana; Syrygina, Taisiia; Lukinov, Vitaliy
2018-03-01
This article represents features of the elaboration of technology organizational models of high-rise building construction in technology organizational documentation on the example of the plan of construction organization. Some examples of enhancing the effectiveness of high-rise building construction based on developments of several options of the organizational and technological plan are examined. Qualitative technology organizational documentation allows to increase the competitiveness of construction companies and provides prime cost of construction and assembly works reductions. Emphasis is placed on the necessity to comply with the principle of comprehensiveness of engineering, scientific and research works, development activities and scientific and technical support.
Final Inventory Work-Off Plan for ORNL transuranic wastes (1986 version)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dickerson, L.S.
1988-05-01
The Final Inventory Work-Off Plan (IWOP) for ORNL Transuranic Wastes addresses ORNL's strategy for retrieval, certification, and shipment of its stored and newly generated contact-handled (CH) and remote-handled (RH) transuranic (TRU) wastes to the Waste Isolation Pilot Plant (WIPP), the proposed geologic repository near Carlsbad, New Mexico. This document considers certification compliance with the WIPP waste acceptance criteria (WAC) and is consistent with the US Department of Energy's Long-Range Master Plan for Defense Transuranic Waste Management. This document characterizes Oak Ridge National Laboratory's (ORNL's) TRU waste by type and estimates the number of shipments required to dispose of it; describesmore » the methods, facilities, and systems required for its certification and shipment; presents work-off strategies and schedules for retrieval, certification, and transportation; discusses the resource needs and additions that will be required for the effort and forecasts costs for the long-term TRU waste management program; and lists public documentation required to support certification facilities and strategies. 22 refs., 6 figs., 10 tabs.« less
Some guidance on preparing validation plans for the DART Full System Models.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gray, Genetha Anne; Hough, Patricia Diane; Hills, Richard Guy
2009-03-01
Planning is an important part of computational model verification and validation (V&V) and the requisite planning document is vital for effectively executing the plan. The document provides a means of communicating intent to the typically large group of people, from program management to analysts to test engineers, who must work together to complete the validation activities. This report provides guidelines for writing a validation plan. It describes the components of such a plan and includes important references and resources. While the initial target audience is the DART Full System Model teams in the nuclear weapons program, the guidelines are generallymore » applicable to other modeling efforts. Our goal in writing this document is to provide a framework for consistency in validation plans across weapon systems, different types of models, and different scenarios. Specific details contained in any given validation plan will vary according to application requirements and available resources.« less
Code of Federal Regulations, 2010 CFR
2010-01-01
... improvement. (d) RC&D measure plan. A plan document for a land area, directly controlled or under the... area. (f) Watershed works of improvement. Structural, nonstructural, and land treatment measures... costs of installing WS works of improvement or RCD measures by the Federal Government and by sponsoring...
Code of Federal Regulations, 2011 CFR
2011-01-01
... improvement. (d) RC&D measure plan. A plan document for a land area, directly controlled or under the... area. (f) Watershed works of improvement. Structural, nonstructural, and land treatment measures... costs of installing WS works of improvement or RCD measures by the Federal Government and by sponsoring...
Engineering Task Plan for the Ultrasonic Inspection of Hanford Double Shell Tanks (DST) FY2000
DOE Office of Scientific and Technical Information (OSTI.GOV)
JENSEN, C.E.
2000-01-10
This document facilitates the ultrasonic examination of Hanford double-shell tanks. Included are a plan for engineering activities (individual responsibilities), plan for performance demonstration testing, and a plan for field activities (tank inspection). Also included are a Statement of Work for contractor performance of the work and a protocol to be followed should tank flaws that exceed the acceptance criteria be discovered.
Planning for Impact: A Guide to Planning Effective Family Program.
ERIC Educational Resources Information Center
Hardy, James M.
A document intended to provide program planning guidelines for Young Men's Christian Associations (YMCAs) desirous of working with families, recommends adherence to eight principles and following of five steps. The principles involve planning before action, fact finding and analysis, clear delineation of operational objectives, planning at all…
XIONG, Wei; PHILLIPS, Michael R.
2016-01-01
The following document is a translation of the 2015-2020 National Mental Health Work Plan of the People's Republic of China which was issued by the General Office of China's State Council on June 4, 2015. The original Chinese version of the document is available at the official government website: http://www.gov.cn/gongbao/content/2015/content_2883226.htm The translators have added annotations at the end of the document that provide background information to help contextualize content that may be unclear to readers unfamiliar with China and explain their decisions when translating terms that can have multiple interpretations. PMID:27688639
Non-Profit/Higher Education Project Management Series: The Project Plan
ERIC Educational Resources Information Center
Burgher, Karl E.; Snyder, Michael
2012-01-01
This is the second installment of the AACRAO management series focusing on project management in the academy. In this article, the authors focus on white papers (often called charters, briefs, or fact sheets) and their partner, the work plan. The work plan is a detailed document that defines each aspect of a project. It is often preceded by a…
7 CFR 25.403. - Ongoing 2-year work plan requirement.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 25.403. Agriculture Office of the Secretary of Agriculture RURAL EMPOWERMENT ZONES AND ENTERPRISE COMMUNITIES Post-Designation Requirements § 25.403. Ongoing 2-year work plan requirement. (a) Each Empowerment... conditional upon the designation of the community as an Empowerment Zone; and (iv) Documentation of...
7 CFR 25.403. - Ongoing 2-year work plan requirement.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 25.403. Agriculture Office of the Secretary of Agriculture RURAL EMPOWERMENT ZONES AND ENTERPRISE COMMUNITIES Post-Designation Requirements § 25.403. Ongoing 2-year work plan requirement. (a) Each Empowerment... conditional upon the designation of the community as an Empowerment Zone; and (iv) Documentation of...
7 CFR 25.403. - Ongoing 2-year work plan requirement.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 25.403. Agriculture Office of the Secretary of Agriculture RURAL EMPOWERMENT ZONES AND ENTERPRISE COMMUNITIES Post-Designation Requirements § 25.403. Ongoing 2-year work plan requirement. (a) Each Empowerment... conditional upon the designation of the community as an Empowerment Zone; and (iv) Documentation of...
7 CFR 25.403. - Ongoing 2-year work plan requirement.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 25.403. Agriculture Office of the Secretary of Agriculture RURAL EMPOWERMENT ZONES AND ENTERPRISE COMMUNITIES Post-Designation Requirements § 25.403. Ongoing 2-year work plan requirement. (a) Each Empowerment... conditional upon the designation of the community as an Empowerment Zone; and (iv) Documentation of...
DOE Office of Scientific and Technical Information (OSTI.GOV)
DUNCAN JB; GUTHRIE MD
2008-08-29
This report documents the laboratory results of RPP-PLAN-35958, Test Plan for the Effluent Treatment Facility to Reduce Chrome (VI) to Chrome (III) in the Secondary Waste Stream With the exception of the electrochemical corrosion scans, all work was carried out at the Center for Laboratory Science (CLS) located at the Columbia Basin College. This document summarizes the work carried out at CLS and includes the electrochemical scans and associated corrosion rates for 304 and 316L stainless steel.
Individual Development Plans as Governance Tools--Changed Governance of Teachers' Work
ERIC Educational Resources Information Center
Parding, Karolina; Liljegren, Andreas
2017-01-01
Auditing, accountability, and transparency are concepts that greatly impact the working conditions of today's public sector professionals, including teachers. Documentation requirements have been on the increase for some time, which can be seen in the education sector's Individual Development Plans (IDPs), for example. These IDPs are pedagogical…
Guidance for Preparing a Facility Plan. Revised Edition.
ERIC Educational Resources Information Center
Environmental Protection Agency, Washington, DC. Office of Water Programs.
This document provides information to assist with preparing a preliminary facility plan for construction of municipal sewage treatment works. The text describes the requirements in the applicable laws and regulations and suggests a planning process by which they can be met. (CS)
7 CFR 1710.205 - Minimum approval requirements for all load forecasts.
Code of Federal Regulations, 2013 CFR
2013-01-01
... electronically to RUS computer software applications. RUS will evaluate borrower load forecasts for readability...'s engineering planning documents, such as the construction work plan, incorporate consumer and usage...
7 CFR 1710.205 - Minimum approval requirements for all load forecasts.
Code of Federal Regulations, 2011 CFR
2011-01-01
... electronically to RUS computer software applications. RUS will evaluate borrower load forecasts for readability...'s engineering planning documents, such as the construction work plan, incorporate consumer and usage...
7 CFR 1710.205 - Minimum approval requirements for all load forecasts.
Code of Federal Regulations, 2012 CFR
2012-01-01
... electronically to RUS computer software applications. RUS will evaluate borrower load forecasts for readability...'s engineering planning documents, such as the construction work plan, incorporate consumer and usage...
Wang, Ning; Yu, Ping; Hailey, David
2015-08-01
The nursing care plan plays an essential role in supporting care provision in Australian aged care. The implementation of electronic systems in aged care homes was anticipated to improve documentation quality. Standardized nursing terminologies, developed to improve communication and advance the nursing profession, are not required in aged care practice. The language used by nurses in the nursing care plan and the effect of the electronic system on documentation quality in residential aged care need to be investigated. To describe documentation practice for the nursing care plan in Australian residential aged care homes and to compare the quantity and quality of documentation in paper-based and electronic nursing care plans. A nursing documentation audit was conducted in seven residential aged care homes in Australia. One hundred and eleven paper-based and 194 electronic nursing care plans, conveniently selected, were reviewed. The quantity of documentation in a care plan was determined by the number of phrases describing a resident problem and the number of goals and interventions. The quality of documentation was measured using 16 relevant questions in an instrument developed for the study. There was a tendency to omit 'nursing problem' or 'nursing diagnosis' in the nursing process by changing these terms (used in the paper-based care plan) to 'observation' in the electronic version. The electronic nursing care plan documented more signs and symptoms of resident problems and evaluation of care than the paper-based format (48.30 vs. 47.34 out of 60, P<0.01), but had a lower total mean quality score. The electronic care plan contained fewer problem or diagnosis statements, contributing factors and resident outcomes than the paper-based system (P<0.01). Both types of nursing care plan were weak in documenting measurable and concrete resident outcomes. The overall quality of documentation content for the nursing process was no better in the electronic system than in the paper-based system. Omission of the nursing problem or diagnosis from the nursing process may reflect a range of factors behind the practice that need to be understood. Further work is also needed on qualitative aspects of the nurse care plan, nurses' attitudes towards standardized terminologies and the effect of different documentation practice on care quality and resident outcomes. Copyright © 2015 Elsevier Ireland Ltd. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brown, Geoffrey Wayne; Leonard, Philip; Hartline, Ernest Leon
High Explosives Science and Technology (M-7) completed all required formulation and testing of Remediated Nitrate Salt (RNS) surrogates on April 27, 2016 as specified in PLAN-TA9-2443 Rev B, "Remediated Nitrate Salt (RNS) Surrogate Formulation and Testing Standard Procedure", released February 16, 2016. This report summarizes the results of the work and also includes additional documentation required in that test plan. All formulation and testing was carried out according to PLAN-TA9-2443 Rev B. The work was carried out in three rounds, with the full matrix of samples formulated and tested in each round. Results from the first round of formulation andmore » testing were documented in memorandum M7-J6-6042, " Results from First Round of Remediated Nitrate Salt Surrogate Formulation and Testing." Results from the second round of formulation and testing were documented in M7-16-6053 , "Results from the Second Round of Remediated Nitrate Salt Surrogate Formulation and Testing." Initial results from the third round were documented in M7-16-6057, "Initial Results from the Third Round of Remediated Nitrate Salt Formulation and Testing."« less
Data categories for marine planning
Lightsom, Frances L.; Cicchetti, Giancarlo; Wahle, Charles M.
2015-01-01
The U.S. National Ocean Policy calls for a science- and ecosystem-based approach to comprehensive planning and management of human activities and their impacts on America’s oceans. The Ocean Community in Data.gov is an outcome of 2010–2011 work by an interagency working group charged with designing a national information management system to support ocean planning. Within the working group, a smaller team developed a list of the data categories specifically relevant to marine planning. This set of categories is an important consensus statement of the breadth of information types required for ocean planning from a national, multidisciplinary perspective. Although the categories were described in a working document in 2011, they have not yet been fully implemented explicitly in online services or geospatial metadata, in part because authoritative definitions were not created formally. This document describes the purpose of the data categories, provides definitions, and identifies relations among the categories and between the categories and external standards. It is intended to be used by ocean data providers, managers, and users in order to provide a transparent and consistent framework for organizing and describing complex information about marine ecosystems and their connections to humans.
Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2
DOE Office of Scientific and Technical Information (OSTI.GOV)
GRYGIEL, M.L.
1998-10-08
Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baselinemore » and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.« less
This document is composed of a work plan and additional technical information which demonstrates the qualifications of Detox Industries, Inc. to conduct remediation of a PCB contaminated sludge at General Motors (GM) plant in New York. Provided are the results of a field demons...
NASA Technical Reports Server (NTRS)
1980-01-01
An updated program plan is presented showing the task descriptions depicting the work, progress, achievements, and the cause of any deviations from the original plan (SC-1), and how this impacted on the original schedule of the program. In addition there is an update documenting all design alterations made during the pre-production phase and a complete up to date set of engineering and manufacturing documentation (CM-1). The purpose of the work in the original plan was to explore, design, develop, test, and deliver 1000 watts of prototype flat plate, photovoltaic modules appropriate for use in applications in the 20 to 500 kilowatt range and which show potential for meeting the 1986 cost goals.
[Multimodal document management in radiotherapy].
Fahrner, H; Kirrmann, S; Röhner, F; Schmucker, M; Hall, M; Heinemann, F
2013-12-01
After incorporating treatment planning and the organisational model of treatment planning in the operating schedule system (BAS, "Betriebsablaufsystem"), complete document qualities were embedded in the digital environment. The aim of this project was to integrate all documents independent of their source (paper-bound or digital) and to make content from the BAS available in a structured manner. As many workflow steps as possible should be automated, e.g. assigning a document to a patient in the BAS. Additionally it must be guaranteed that at all times it could be traced who, when, how and from which source documents were imported into the departmental system. Furthermore work procedures should be changed that the documentation conducted either directly in the departmental system or from external systems can be incorporated digitally and paper document can be completely avoided (e.g. documents such as treatment certificate, treatment plans or documentation). It was a further aim, if possible, to automate the removal of paper documents from the departmental work flow, or even to make such paper documents superfluous. In this way patient letters for follow-up appointments should automatically generated from the BAS. Similarly patient record extracts in the form of PDF files should be enabled, e.g. for controlling purposes. The available document qualities were analysed in detail by a multidisciplinary working group (BAS-AG) and after this examination and assessment of the possibility of modelling in our departmental workflow (BAS) they were transcribed into a flow diagram. The gathered specifications were implemented in a test environment by the clinical and administrative IT group of the department of radiation oncology and subsequent to a detailed analysis introduced into clinical routine. The department has succeeded under the conditions of the aforementioned criteria to embed all relevant documents in the departmental workflow via continuous processes. Since the completion of the concepts and the implementation in our test environment 15,000 documents were introduced into the departmental workflow following routine approval. Furthermore approximately 5000 appointment letters for patient aftercare per year were automatically generated by the BAS. In addition patient record extracts in the form of PDF files for the medical services of the healthcare insurer can be generated.
CASL Verification and Validation Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mousseau, Vincent Andrew; Dinh, Nam
2016-06-30
This report documents the Consortium for Advanced Simulation of LWRs (CASL) verification and validation plan. The document builds upon input from CASL subject matter experts, most notably the CASL Challenge Problem Product Integrators, CASL Focus Area leaders, and CASL code development and assessment teams. This document will be a living document that will track progress on CASL to do verification and validation for both the CASL codes (including MPACT, CTF, BISON, MAMBA) and for the CASL challenge problems (CIPS, PCI, DNB). The CASL codes and the CASL challenge problems are at differing levels of maturity with respect to validation andmore » verification. The gap analysis will summarize additional work that needs to be done. Additional VVUQ work will be done as resources permit. This report is prepared for the Department of Energy’s (DOE’s) CASL program in support of milestone CASL.P13.02.« less
Eastern Washington Intermodal Transportation Study Scope of Work
DOT National Transportation Integrated Search
1993-02-04
This document presents a detailed Scope of Work to guide implementation of : the Eastern Washington Intermodal Transportation Study. Included is a : description of project management and staff responsibilities, a detailed work : plan and timetable fo...
Support to LANL: Cost estimation. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This report summarizes the activities and progress by ICF Kaiser Engineers conducted on behalf of Los Alamos National Laboratories (LANL) for the US Department of Energy, Office of Waste Management (EM-33) in the area of improving methods for Cost Estimation. This work was conducted between October 1, 1992 and September 30, 1993. ICF Kaiser Engineers supported LANL in providing the Office of Waste Management with planning and document preparation services for a Cost and Schedule Estimating Guide (Guide). The intent of the Guide was to use Activity-Based Cost (ABC) estimation as a basic method in preparing cost estimates for DOEmore » planning and budgeting documents, including Activity Data Sheets (ADSs), which form the basis for the Five Year Plan document. Prior to the initiation of the present contract with LANL, ICF Kaiser Engineers was tasked to initiate planning efforts directed toward a Guide. This work, accomplished from June to September, 1992, included visits to eight DOE field offices and consultation with DOE Headquarters staff to determine the need for a Guide, the desired contents of a Guide, and the types of ABC estimation methods and documentation requirements that would be compatible with current or potential practices and expertise in existence at DOE field offices and their contractors.« less
Peer Review Plan for OPPT Work Plan Risk Assessment of 1 - Bromopropane (“1 - BP”)
This document outlines the peer review plan for a risk assessment which addresses occupational uses of 1-BP in dry-cleaning and foam gluing operations, consumer uses in aerosol solvent cleaners and spray adhesives, and its effects on human health.
DOT National Transportation Integrated Search
2003-10-02
This document is one of a series of working papers that report on progress for the US DOT evaluation for Phase I of the ORANGES field operational test. Each working paper corresponds to a Phase I task. At the conclusion of Phase I, these documents wi...
2000-02-01
1-4 1.2 .2 .3 S oil ... oil ...................................................................................................... 5-2 5.2.3 Surface W ater...S oil ............................................................................................................. 6-2 6.2.2 G roundw ater
Perspectives and Plans for Graduate Studies. 7. Sociology 1973.
ERIC Educational Resources Information Center
Ontario Council on Graduate Studies, Toronto. Advisory Committee on Academic Planning.
This document reports on a formal planning assessment for sociology conducted by the Advisory Committee on Academic Planning of the Ontario Council on Graduate Studies. Data, reports and comments, and recommendations on a plan for graduate work in sociology in the province is set out. Recommendations are: (1) That the high rates of delay and…
ERIC Educational Resources Information Center
Center for Literacy, Inc., Philadelphia, PA.
This document combines a final project report and the resulting guidebook of 20 lesson plans for English as a second language (ESL) instructors to help learners work within the Temporary Assistance to Needy Families (TANF) system and acquire effective job readiness strategies, choose a career path, and pursue employment. The report describes the…
NASA Technical Reports Server (NTRS)
Connelly, L. C.
1977-01-01
The mission planning processor is a user oriented tool for consumables management and is part of the total consumables subsystem management concept. The approach to be used in developing a working model of the mission planning processor is documented. The approach includes top-down design, structured programming techniques, and application of NASA approved software development standards. This development approach: (1) promotes cost effective software development, (2) enhances the quality and reliability of the working model, (3) encourages the sharing of the working model through a standard approach, and (4) promotes portability of the working model to other computer systems.
Configuration Management Plan for the Tank Farm Contractor
DOE Office of Scientific and Technical Information (OSTI.GOV)
WEIR, W.R.
The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in themore » management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.« less
Traffic safety for older people : 5-year plan.
DOT National Transportation Integrated Search
2013-12-01
This document is intended to serve as the plan for National Highway Traffic Safety Administration activities to address traffic safety concerns of older people. Given the increasing proportion of older people in the population, NHTSA must work in con...
75 FR 27618 - RTCA Government/Industry Air Traffic Management Advisory Committee (ATMAC)
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-17
... Plenary (Welcome and Introductions); Trajectory Operations (TOps) Work Group Presentation of Document... Work Group (NGIWG) Report, Discussion, and possible Next Steps; ADS-B Work Group Presentation of Legacy... Activity Airspace Program (NSAAP) Presentation Requested by Requirements and Planning Work Group, Airspace...
High Skills, High Wages. Washington's Comprehensive Plan for Workforce Training and Education.
ERIC Educational Resources Information Center
Washington State Workforce Training and Education Coordinating Board, Olympia.
This document is the 1996 update to a 1994 Comprehensive Plan for Workforce Training and Education in Washington State. The plan focuses on collective actions that public and private sector partners need to take to have the best work force development system in the nation. The plan details how jobs are increasingly demanding higher-level skills,…
The Timmons Savings Plan: A Working Document on a Plan to Encourage Families to Save for College.
ERIC Educational Resources Information Center
Tierney, Michael L.
The Timmons Savings Plan, which encourages families to save toward college costs, is analyzed. This plan allows for periodic (non-tax deductible) contributions to an account administered by the U.S. Department of the Treasury. The amount deposited would be matched by the federal government in exchange for the government's earning the interest on…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brown, Geoffrey Wayne; Leonard, Philip; Hartline, Ernest Leon
High Explosives and Technology (M-7) completed the second round of formulation and testing of Remediated Nitrate Salt (RNS) surrogates on March 17, 2016. This report summarizes the results of the work and also includes additional documentation required under test plan PLAN-TA9-2443 Rev B, "Remediated Nitrate Salt (RNS) Surrogate Formulation and Testing Standard Procedure", released February 16, 2016. All formulation and testing was carried out according to PLAN-TA9-2443 Rev B. Results from the first round of formulation and testing were documented in memorandum M7-16-6042, "Results from First Round of Remediated Nitrate Salt Surrogate Formulation and Testing."
Integration of Hierarchical Goal Network Planning and Autonomous Path Planning
2016-03-01
Conference on Robotics and Automation (ICRA); 2010 May 3– 7; Anchorage, AK. p. 2902–2908. 4. Ayan NF, Kuter U, Yaman F, Goldman RP. Hotride...DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution unlimited. 13. SUPPLEMENTARY NOTES 14. ABSTRACT Automated planning has...world robotic systems. This report documents work to integrate a hierarchical goal network planning algorithm with low-level path planning. The system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yoo, Jun Soo; Choi, Yong Joon; Smith, Curtis Lee
2016-09-01
This document addresses two subjects involved with the RELAP-7 Software Verification and Validation Plan (SVVP): (i) the principles and plan to assure the independence of RELAP-7 assessment through the code development process, and (ii) the work performed to establish the RELAP-7 assessment plan, i.e., the assessment strategy, literature review, and identification of RELAP-7 requirements. Then, the Requirements Traceability Matrices (RTMs) proposed in previous document (INL-EXT-15-36684) are updated. These RTMs provide an efficient way to evaluate the RELAP-7 development status as well as the maturity of RELAP-7 assessment through the development process.
Artificial Gravity Research Plan
NASA Technical Reports Server (NTRS)
Cromwell, Ronita
2014-01-01
This document describes the forward working plan to identify what countermeasure resources are needed for a vehicle with an artificial gravity module (intermittent centrifugation) and what Countermeasure Resources are needed for a rotating transit vehicle (continuous centrifugation) to minimize the effects of microgravity to Mars Exploration crewmembers.
State Options for Supporting Delinquency Prevention: A Working Paper.
ERIC Educational Resources Information Center
Croan, Gerald M.; And Others
A supplement to the related document "Delinquency Prevention: Theories and Strategies," this paper analyzes the options for state agencies (particularly state planning agencies participating in the Law Enforcement Assistance Administration formula grant program) to promote and support program forms recommended in the companion document.…
Investigating the Watergate Scandal.
ERIC Educational Resources Information Center
Ritchie, Donald A.
1998-01-01
Summarizes the events leading up to and the investigation that followed the Watergate break-in. Presents a lesson plan using primary documents that allows students to explore the workings of congressional investigations, the key figures in the scandal, and the arguments of the different participants. Includes copies of the documents. (DSK)
Family Planning in Five Continents: Africa, America, Asia, Europe, Oceania. December 1976 Update.
ERIC Educational Resources Information Center
International Planned Parenthood Federation, London (England).
This document gives highlights of the family planning situation in many countries of the world. Its purpose is to provide a quick reference source for those who work in family planning. Population statistics are included for five continents and many countries. Data for the continents include population in 1976, projected population in 2000,…
Traffic analysis toolbox volume IX : work zone modeling and simulation, a guide for analysts
DOT National Transportation Integrated Search
2009-03-01
This document is the second volume in the FHWA Traffic Analysis Toolbox: Work Zone Analysis series. Whereas the first volume provides guidance to decision-makers at agencies and jurisdictions considering the role of analytical tools in work zone plan...
ERIC Educational Resources Information Center
Wells, Ruth Herman
This document is one of eight in a series of guides designed to help teach and counsel troubled youth. This document focuses on the social skills necessary for on-the-job success. It includes 20 lesson plans that help students learn appropriate behaviors at the work place. The first lesson instructs students on what to wear and bring to work.…
Geotechnical support and topical studies for nuclear waste geologic repositories
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1989-01-01
The present report lists the technical reviews and comments made during the fiscal year 1988 and summarizes the technical progress of the topical studies. In the area of technical assistance, there were numerous activities detailed in the next section. These included 24 geotechnical support activities, including reviews of 6 Study Plans (SP) and participation in 6 SP Review Workshops, review of one whole document Site Characterization Plan (SCP) and participation in the Assembled Document SCP Review Workshops by 6 LBL reviewers; the hosting of a DOE program review, the rewriting of the project statement of work, 2 trips to technicalmore » and planning meetings; preparation of proposed work statements for two new topics for DOE, and 5 instances of technical assistance to DOE. These activities are described in a Table in the following section entitled Geoscience Technical Support for Nuclear Waste Geologic Repositories.''« less
NASA Technical Reports Server (NTRS)
Wang, Charles C.; Peng, Ted; Sue, Miles K.
2004-01-01
In the 23'd Annual SFCG meeting in San Diego, CA, the SFCG created SFCG Action Item No. 23/10 to provide a readable summary of the work done by the Mars Interim Working Group (MIWG). The SFCG created the MIWG to develop a frequency plan for future Mars missions. The working group has produced a number of documents resulting in a recommendation, SFCG Rec 22-1 [1], titled Frequency Assignment Guidelines for Communications in Mars Region, including a frequency plan for the Mars Region. This document is prepared in response to the SFCG Action Item to provide an overview of the considerations taken when selecting the frequencies and to point out where detailed information of the considerations can be found.
Does California's Master Plan Still Work?
ERIC Educational Resources Information Center
Burdman, Pamela
2009-01-01
For nearly 50 years, California's higher education system has been shaped by the tripartite division of the vaunted Master Plan. The 1960 document's bold vision of access and quality safeguarded a system of selective research universities (the University of California) and provided baccalaureate education through less-selective campuses (the…
Test and Evaluation Master Plan (TEMP) for the Ports and Waterways Safety System (PAWSS) Project
DOT National Transportation Integrated Search
1997-01-01
This document outlines the Test Concept for the Ports and Waterways Safety System (PAWSS) Project. This Test and Evaluation Master Plan (TEMP) purpose is to reduce risk and ensure the PAWSS project meets all System Specification and Statement of Work...
Automated Procurement System (APS) revised project management plan (DS-03)
NASA Technical Reports Server (NTRS)
Murphy, Diane R.
1995-01-01
The Project Plan is the governing document for the implementation of the Automated Procurement System (APS). It includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.
ERIC Educational Resources Information Center
Stautberg, Susan Schiffer
Intended for women who plan to combine a career with motherhood, this book is a planning document for the full-time working mother-to-be during the three trimesters of pregnancy and the first trimester of motherhood. Each section discusses physical and mental changes associated with motherhood and includes a calendar for appointments and events…
Revolution in Field Science: Apollo Approach to Inaccessible Surface Exploration
NASA Astrophysics Data System (ADS)
Clark, P. E.
2010-07-01
The extraordinary challenge mission designers, scientists, and engineers, faced in planning the first human expeditions to the surface of another solar system body led to the development of a distinctive and even revolutionary approach to field work. Not only were those involved required to deal effectively with the extreme limitation in resources available for and access to a target as remote as the lunar surface; they were required to developed a rigorous approach to science activities ranging from geological field work to deploying field instruments. Principal aspects and keys to the success of the field work are discussed here, including the highly integrated, intensive, and lengthy science planning, simulation, and astronaut training; the development of a systematic scheme for description and documentation of geological sites and samples; and a flexible yet disciplined methodology for site documentation and sample collection. The capability for constant communication with a ‘backroom’ of geological experts who make requests and weigh in on surface operations was innovative and very useful in encouraging rapid dissemination of information to the greater community in general. An extensive archive of the Apollo era science activity related documents provides evidence of the principal aspects and keys to the success of the field work. The Apollo Surface Journal allows analysis of the astronaut’s performance in terms of capability for traveling on foot, documentation and sampling of field stations, and manual operation of tools and instruments, all as a function of time. The application of these analysis as ‘lessons learned’ for planning the next generation of human or robotic field science activities on the Moon and elsewhere are considered here as well.
Planning Additions to Academic Library Buildings: A Seamless Approach.
ERIC Educational Resources Information Center
Hawthorne, Pat, Ed.; Martin, Ron G., Ed.
This document presents three case studies that illustrate how library staffs and architectural design teams can work together to plan additions that are successful solutions to building problems. The case studies cover the experiences of Hope College, Holland, Michigan (David Jensen, Margaret Jensen), Western Maryland College, Westminster,…
36 CFR 219.30 - Plan documentation.
Code of Federal Regulations, 2011 CFR
2011-07-01
... also contains maps, monitoring and evaluation results, the annual monitoring and evaluation report, and... annual monitoring and evaluation report; and (6) A summary of the projected program of work, updated... years; and a display of the budget trends over at least the past 5 years. (e) Other components. A plan...
A Summary of the Major Documents Signed at the Earth Summit and the Global Forum.
ERIC Educational Resources Information Center
Parson, Edward A.; And Others
1992-01-01
Describes documents produced at the United Nations Conference and the Global Forum: The Rio Declaration, a statement of broad principles to guide national conduct on environmental protection and development; treaties on climate change and biodiversity; forest principles statement; and Agenda 21, a presentation of work plans for sustainable…
Freshwater Fisheries: Program Planning. Appropriate Technologies for Development. Manual M-1A.
ERIC Educational Resources Information Center
Gregory, Steven
This document is designed for policymakers, program planners, trainers, and coordinators who are considering the potential contribution of fresh water fisheries to the people for and with whom they work. Although based on materials generated by Peace Corps experiences, the document is intended for a broader audience. The specific topic area…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dietrich, Richard E.
2016-07-01
This document serves as the System-Level Acceptance Test (SLAT) Plan for Site Name, City, Country. This test plan is to provide independent testing of the Radiation Detection System (RDS) installed at Site Name to verify that Customs has been delivered a fully-functioning system as required by all contractual commitments. The system includes all installed hardware and software components. The SLAT plan will verify that separate components are working individually and collectively from a system perspective.
Earth Science Education Plan: Inspire the Next Generation of Earth Explorers
NASA Technical Reports Server (NTRS)
2004-01-01
The Education Enterprise Strategy, the expanding knowledge of how people learn, and the community-wide interest in revolutionizing Earth and space science education have guided us in developing this plan for Earth science education. This document builds on the success of the first plan for Earth science education published in 1996; it aligns with the new framework set forth in the NASA Education Enterprise Strategy; it recognizes the new educational opportunities resulting from research programs and flight missions; and it builds on the accomplishments th'at the Earth Science Enterprise has made over the last decade in studying Earth as a system. This document embodies comprehensive, practicable plans for inspiring our children; providing educators with the tools they need to teach science, technology, engineering, and mathematics (STEM); and improving our citizens' scientific literacy. This plan describes an approach to systematically sharing knowledge; developing the most effective mechanisms to achieve tangible, lasting results; and working collaboratively to catalyze action at a scale great enough to ensure impact nationally and internationally. This document will evolve and be periodically reviewed in partnership with the Earth science education community.
Spent nuclear fuel project high-level information management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Main, G.C.
1996-09-13
This document presents the results of the Spent Nuclear Fuel Project (SNFP) Information Management Planning Project (IMPP), a short-term project that identified information management (IM) issues and opportunities within the SNFP and outlined a high-level plan to address them. This high-level plan for the SNMFP IM focuses on specific examples from within the SNFP. The plan`s recommendations can be characterized in several ways. Some recommendations address specific challenges that the SNFP faces. Others form the basis for making smooth transitions in several important IM areas. Still others identify areas where further study and planning are indicated. The team`s knowledge ofmore » developments in the IM industry and at the Hanford Site were crucial in deciding where to recommend that the SNFP act and where they should wait for Site plans to be made. Because of the fast pace of the SNFP and demands on SNFP staff, input and interaction were primarily between the IMPP team and members of the SNFP Information Management Steering Committee (IMSC). Key input to the IMPP came from a workshop where IMSC members and their delegates developed a set of draft IM principles. These principles, described in Section 2, became the foundation for the recommendations found in the transition plan outlined in Section 5. Availability of SNFP staff was limited, so project documents were used as a basis for much of the work. The team, realizing that the status of the project and the environment are continually changing, tried to keep abreast of major developments since those documents were generated. To the extent possible, the information contained in this document is current as of the end of fiscal year (FY) 1995. Programs and organizations on the Hanford Site as a whole are trying to maximize their return on IM investments. They are coordinating IM activities and trying to leverage existing capabilities. However, the SNFP cannot just rely on Sitewide activities to meet its IM requirements. While the SNFP can use some work done Sitewide and by projects such as the Tank Waste Remediation System (TWRS), they will still need to make some IM investments of their own.« less
Work and the Quality of Life: Resource Papers for Work in America.
ERIC Educational Resources Information Center
O'Toole, James, Ed.
A sequel to Work in America, the volume of resource papers provides additional data on issues concerning the relationships of work to health, education, and welfare. The report is a planning document which focuses on how the institution of work can be changed to improve the quality of life, to contribute to a more just society, and to strengthen…
14 CFR 77.75 - Establishment of antenna farm areas.
Code of Federal Regulations, 2011 CFR
2011-01-01
... indicated on an FAA planning document or military service military airport planning document. Planned or...; any other FAA planning document, or military service military airport planning document. Public use... layout plan, a military service approved military airport layout plan, or by any planning document...
Feasibility Study for Low Drag Acoustic Liners Final Report
NASA Technical Reports Server (NTRS)
Riedel, Brian; Wu, Jackie
2017-01-01
This report documents the design and structural analysis as a final deliverable for the Phase 1 contract activity. Also included is a community noise test plan, which is a key deliverable for Phase 2. Finally, a high-level estimate (Phase 3 deliverable) is provided for the work statement of Phases 2-4, which covers the build of two inlet test articles, planning and execution of a flight test with the test inlets, as well as data analysis and final documentation. The two test inlets will be compared to the production baseline inlet configuration. There is also a plan to test one of the inlets "hardwalled" using speed tape or some other similar tape to block the acoustic perforations.
DOT National Transportation Integrated Search
1997-06-18
This document has been prepared as part of the New York State Department of Transportation (NYSDOT) Buffalo and Niagara Falls Intelligent Transportation System Study. This working paper utilizes input from the previous working papers to generate an o...
ERIC Educational Resources Information Center
Ladd, Helen F.
2011-01-01
This quantitative study examines the relationship between teachers' perceptions of their working conditions and their intended and actual departures from schools. Based on rich administrative data for North Carolina combined with a 2006 statewide survey administered to all teachers in the state, the study documents that working conditions are…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) to be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This revision is a complete update to cover the FY 1994 time period. This document describes the overall ER Missions Area and provides FYWP appendices for each of the following five program areas: Remedial Action (RA); Decontamination and Decommissioning (D&D); Project Management and Support (PM&S); Surveillance and Maintenance (S&M); and Disposal Facilities (DF).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barbee, D; McCarthy, A; Galavis, P
Purpose: Errors found during initial physics plan checks frequently require replanning and reprinting, resulting decreased departmental efficiency. Additionally, errors may be missed during physics checks, resulting in potential treatment errors or interruption. This work presents a process control created using the Eclipse Scripting API (ESAPI) enabling dosimetrists and physicists to detect potential errors in the Eclipse treatment planning system prior to performing any plan approvals or printing. Methods: Potential failure modes for five categories were generated based on available ESAPI (v11) patient object properties: Images, Contours, Plans, Beams, and Dose. An Eclipse script plugin (PlanCheck) was written in C# tomore » check errors most frequently observed clinically in each of the categories. The PlanCheck algorithms were devised to check technical aspects of plans, such as deliverability (e.g. minimum EDW MUs), in addition to ensuring that policy and procedures relating to planning were being followed. The effect on clinical workflow efficiency was measured by tracking the plan document error rate and plan revision/retirement rates in the Aria database over monthly intervals. Results: The number of potential failure modes the PlanCheck script is currently capable of checking for in the following categories: Images (6), Contours (7), Plans (8), Beams (17), and Dose (4). Prior to implementation of the PlanCheck plugin, the observed error rates in errored plan documents and revised/retired plans in the Aria database was 20% and 22%, respectively. Error rates were seen to decrease gradually over time as adoption of the script improved. Conclusion: A process control created using the Eclipse scripting API enabled plan checks to occur within the planning system, resulting in reduction in error rates and improved efficiency. Future work includes: initiating full FMEA for planning workflow, extending categories to include additional checks outside of ESAPI via Aria database queries, and eventual automated plan checks.« less
Microgravity strategic planning exercise
NASA Technical Reports Server (NTRS)
Halpern, Richard; Downey, Jim; Harvey, Harold
1991-01-01
The Center for Space and Advanced Technology supported a planning exercise for the Microgravity Program management at the Marshall Space Flight Center. The effort focused on the status of microgravity work at MSFC and elsewhere with the objective of preparing a goal-oriented strategic planning document which could be used for informational/brochure purposes. The effort entailed numerous interactions and presentations with Field Center programmatic components and Headquarters personnel. Appropriate material was consolidated in a draft format for a MSFC Strategic Plan.
Planned and Unplanned Aspects of Occupational Choices by Youth. Final Report.
ERIC Educational Resources Information Center
Ellis, Robert A.; And Others
This document includes reports on four subjects relevant to planned and unplanned aspects of occupational choices by youth. (1) "Toward a Morphology of Occupational Choice," by Robert A. Ellis and others, discusses intrinsic features and extrinsic rewards of work, extra-role considerations, and goal perception as major influences on occupational…
Fotonovelas and Comic Books--The Use of Popular Graphic Media in Development.
ERIC Educational Resources Information Center
Parlato, Ronald; And Others
Intended as a working document for communications professionals and as reference material for planning administrators, the study compared comic books and fotonovelas, and analyzed their use in health and nutrition, family planning, agriculture, and literacy programs in developing nations. Most of the somewhat limited efforts to use comics and…
NASA Technical Reports Server (NTRS)
1985-01-01
The study was conducted in 3 parts over a 3 year period. The study schedule and the documentation associated with each study part is given. This document summarized selected study results from the conceptual design and programmatics segment of the effort. The objectives were: (1) to update requirements and tradeoffs and develop a detailed design and mission requirements document; (2) to develop conceptual designs and mission descriptions; and (3) to develop programmatic, i.e., work breakdown structure and work breakdown structure dictionary, estimated cost, and implementing plans and schedules.
Balancing Plan-Driven and Agile Methods in Software Engineering Project Courses
NASA Astrophysics Data System (ADS)
Boehm, Barry; Port, Dan; Winsor Brown, A.
2002-09-01
For the past 6 years, we have been teaching a two-semester software engineering project course. The students organize into 5-person teams and develop largely web-based electronic services projects for real USC campus clients. We have been using and evolving a method called Model- Based (System) Architecting and Software Engineering (MBASE) for use in both the course and in industrial applications. The MBASE Guidelines include a lot of documents. We teach risk-driven documentation: if it is risky to document something, and not risky to leave it out (e.g., GUI screen placements), leave it out. Even so, students tend to associate more documentation with higher grades, although our grading eventually discourages this. We are always on the lookout for ways to have students learn best practices without having to produce excessive documentation. Thus, we were very interested in analyzing the various emerging agile methods. We found that agile methods and milestone plan-driven methods are part of a “how much planning is enough?” spectrum. Both agile and plan-driven methods have home grounds of project characteristics where they clearly work best, and where the other will have difficulties. Hybrid agile/plan-driven approaches are feasible, and necessary for projects having a mix of agile and plan-driven home ground characteristics. Information technology trends are going more toward the agile methods' home ground characteristics of emergent requirements and rapid change, although there is a concurrent increase in concern with dependability. As a result, we are currently experimenting with risk-driven combinations of MBASE and agile methods, such as integrating requirements, test plans, peer reviews, and pair programming into “agile quality management.”
ERIC Educational Resources Information Center
Salem County Board for Vocational Education, Woodstown, NJ.
A strategic plan for vocational-technical education (VTE) in Salem County, New Jersey, in the year 2002 was developed by the county board of VTE and county advisory board with input from students, parents, employers, elected officials, and the community in general. Six strategic planning subcommittees were formed to review the district's VTE…
Employers Talk about Building a School-to-Work System: Voices from the Field.
ERIC Educational Resources Information Center
Wills, Joan L., Ed.
This document contains background information on the school-to-work (STW) movement and 20 essays written by employers and intermediaries involved in STW program planning and implementation. Four points are highlighted: (1) it takes time to assemble an STW system; (2) the number of students participating in structured work-based learning remains…
Public health human resources: a comparative analysis of policy documents in two Canadian provinces
2014-01-01
Background Amidst concerns regarding the capacity of the public health system to respond rapidly and appropriately to threats such as pandemics and terrorism, along with changing population health needs, governments have focused on strengthening public health systems. A key factor in a robust public health system is its workforce. As part of a nationally funded study of public health renewal in Canada, a policy analysis was conducted to compare public health human resources-relevant documents in two Canadian provinces, British Columbia (BC) and Ontario (ON), as they each implement public health renewal activities. Methods A content analysis of policy and planning documents from government and public health-related organizations was conducted by a research team comprised of academics and government decision-makers. Documents published between 2003 and 2011 were accessed (BC = 27; ON = 20); documents were either publicly available or internal to government and excerpted with permission. Documentary texts were deductively coded using a coding template developed by the researchers based on key health human resources concepts derived from two national policy documents. Results Documents in both provinces highlighted the importance of public health human resources planning and policies; this was particularly evident in early post-SARS documents. Key thematic areas of public health human resources identified were: education, training, and competencies; capacity; supply; intersectoral collaboration; leadership; public health planning context; and priority populations. Policy documents in both provinces discussed the importance of an educated, competent public health workforce with the appropriate skills and competencies for the effective and efficient delivery of public health services. Conclusion This policy analysis identified progressive work on public health human resources policy and planning with early documents providing an inventory of issues to be addressed and later documents providing evidence of beginning policy development and implementation. While many similarities exist between the provinces, the context distinctive to each province has influenced and shaped how they have focused their public health human resources policies. PMID:24564931
Public health human resources: a comparative analysis of policy documents in two Canadian provinces.
Regan, Sandra; MacDonald, Marjorie; Allan, Diane E; Martin, Cheryl; Peroff-Johnston, Nancy
2014-02-24
Amidst concerns regarding the capacity of the public health system to respond rapidly and appropriately to threats such as pandemics and terrorism, along with changing population health needs, governments have focused on strengthening public health systems. A key factor in a robust public health system is its workforce. As part of a nationally funded study of public health renewal in Canada, a policy analysis was conducted to compare public health human resources-relevant documents in two Canadian provinces, British Columbia (BC) and Ontario (ON), as they each implement public health renewal activities. A content analysis of policy and planning documents from government and public health-related organizations was conducted by a research team comprised of academics and government decision-makers. Documents published between 2003 and 2011 were accessed (BC = 27; ON = 20); documents were either publicly available or internal to government and excerpted with permission. Documentary texts were deductively coded using a coding template developed by the researchers based on key health human resources concepts derived from two national policy documents. Documents in both provinces highlighted the importance of public health human resources planning and policies; this was particularly evident in early post-SARS documents. Key thematic areas of public health human resources identified were: education, training, and competencies; capacity; supply; intersectoral collaboration; leadership; public health planning context; and priority populations. Policy documents in both provinces discussed the importance of an educated, competent public health workforce with the appropriate skills and competencies for the effective and efficient delivery of public health services. This policy analysis identified progressive work on public health human resources policy and planning with early documents providing an inventory of issues to be addressed and later documents providing evidence of beginning policy development and implementation. While many similarities exist between the provinces, the context distinctive to each province has influenced and shaped how they have focused their public health human resources policies.
Implementation plan for HANDI 2000 TWRS master equipment list
DOE Office of Scientific and Technical Information (OSTI.GOV)
BENNION, S.I.
This document presents the implementation plan for an additional deliverable of the HANDI 2000 Project. The PassPort Equipment Data module processes include those portions of the COTS PassPort system required to support tracking and management of the Master Equipment List for Lockheed Martin Hanford Company (LMHC) and custom software created to work with the COTS products.
ALS rocket engine combustion devices design and demonstration
NASA Technical Reports Server (NTRS)
Arreguin, Steve
1989-01-01
Work performed during Phase one is summarized and the significant technical and programmatic accomplishments occurring during this period are documented. Besides a summary of the results, methodologies, trade studies, design, fabrication, and hardware conditions; the following are included: the evolving Maintainability Plan, Reliability Program Plan, Failure Summary and Analysis Report, and the Failure Mode and Effect Analysis.
Public Health Education in Florida.
ERIC Educational Resources Information Center
Florida State Dept. of Education, Tallahassee.
This report documents issues related to the work of the Florida Comprehensive Health Professions Education Plan. Public health education prepares students for initial employment or advancement in a number of positions. While the public health work force is primarily employed in various units in local, state, and federal governments, industry also…
7 CFR 1942.126 - Planning, bidding, contracting, constructing, procuring.
Code of Federal Regulations, 2013 CFR
2013-01-01
... evaluate the proposals received or can obtain adequate assistance from other sources, such as State or.... Contract documents must be sufficiently descriptive and legally binding to accomplish the work as...
7 CFR 1942.126 - Planning, bidding, contracting, constructing, procuring.
Code of Federal Regulations, 2012 CFR
2012-01-01
... evaluate the proposals received or can obtain adequate assistance from other sources, such as State or.... Contract documents must be sufficiently descriptive and legally binding to accomplish the work as...
7 CFR 1942.126 - Planning, bidding, contracting, constructing, procuring.
Code of Federal Regulations, 2010 CFR
2010-01-01
... evaluate the proposals received or can obtain adequate assistance from other sources, such as State or.... Contract documents must be sufficiently descriptive and legally binding to accomplish the work as...
7 CFR 1942.126 - Planning, bidding, contracting, constructing, procuring.
Code of Federal Regulations, 2011 CFR
2011-01-01
... evaluate the proposals received or can obtain adequate assistance from other sources, such as State or.... Contract documents must be sufficiently descriptive and legally binding to accomplish the work as...
7 CFR 1942.126 - Planning, bidding, contracting, constructing, procuring.
Code of Federal Regulations, 2014 CFR
2014-01-01
... evaluate the proposals received or can obtain adequate assistance from other sources, such as State or.... Contract documents must be sufficiently descriptive and legally binding to accomplish the work as...
NASA Technical Reports Server (NTRS)
Adair, Jerry R.
1994-01-01
This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.
FY 1987 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less
Gruskin, Sofia; Tarantola, Daniel
2012-01-01
Rhetorical acknowledgment of the value of human rights for the AIDS response continues, yet practical application of human rights principles to national efforts appears to be increasingly deficient. We assess the ways in which international and national strategic plans and other core documents take into account the commitments made by countries to uphold human rights in their efforts towards achieving Universal Access. Key documents from the Joint United Nations Programme on HIV and AIDS (UNAIDS), the World Health Organization (WHO), the World Bank, the Global Fund to Fight AIDS, TB and Malaria (GFATM) and the US President’s Emergency Plan for AIDS Relief (PEPFAR) were reviewed along with 14 national HIV strategic plans chosen for their illustration of the diversity of HIV epidemic patterns, levels of income and geographical location. Whereas human rights concepts overwhelmingly appeared in both international and national strategic documents, their translation into actionable terms or monitoring frameworks was weak, unspecific or absent. Future work should analyse strategic plans, plans of operation, budgets and actual implementation so that full advantage can be taken, not only of the moral and legal value of human rights, but also their instrumental value for achieving Universal Access. PMID:18641464
Vapor Intrusion Characterization Report (Revision 1.0)
Vapor Intrusion Characterization Report (Revision 1) - February 5, 2015: This report, which was approved by the EPA on February 18, 2015, documents the results from implementation of the Final Vapor Intrusion Characterization Work Plan.
Particle Engulfment and Pushing by Solidifying Interfaces (PEPSI)
NASA Technical Reports Server (NTRS)
Stefanescu, Doru Michael; Curreri, Peter A.; Juretsko, F.; Pang, H.; Phalnikar, R.
1993-01-01
The preliminary definition phase included the following actions: producing a science requiring document (draft), producing a science requirements document (preliminary), updating the flight program proposal, project review at NASA Marshall Space Flight Center, and research work as defined in the statement of work. The first three items of this plan have been delivered by the University of Alabama to NASA according to schedule. A project review meeting was held at MSFC on June 29, 1993. Consequently, this part of the report will address the results of the research work performed in the Solidification Laboratory at the University of Alabama during the first six months of the project.
Edwards, M.D.
1987-01-01
The Water Resources Division of the U.S. Geological Survey is developing a National Water Information System (NWIS) that will integrate and replace its existing water data and information systems of the National Water Data Storage and Retrieval System, National Water Data Exchange, National Water-Use Information, and Water Resources Scientific Information Center programs. It will be a distributed data system operated as part of the Division 's Distributed Information System, which is a network of computers linked together through a national telecommunication network known as GEONET. The NWIS is being developed as a series of prototypes that will be integrated as they are completed to allow the development and implementation of the system in a phased manner. It also is being developed in a distributed manner using personnel who work under the coordination of a central NWIS Project Office. Work on the development of the NWIS began in 1983 and it is scheduled for completion in 1990. This document presents an overall plan for the design, development, implementation, and operation of the system. Detailed discussions are presented on each of these phases of the NWIS life cycle. The planning, quality assurance, and configuration management phases of the life cycle also are discussed. The plan is intended to be a working document for use by NWIS management and participants in its design and development and to assist offices of the Division in planning and preparing for installation and operation of the system. (Author 's abstract)
Kuperman, Gilad J; Boyer, Aurelia; Cole, Curt; Forman, Bruce; Stetson, Peter D; Cooper, Mary
2006-01-01
At NewYork-Presbyterian Hospital, we are committed to the delivery of high quality care. We have implemented a strategic planning process to determine the information technology initiatives that will best help us improve quality. The process began with the creation of a Clinical Quality and IT Committee. The Committee identified 2 high priority goals that would enable demonstrably high quality care: 1) excellence at data warehousing, and 2) optimal use of automated clinical documentation to capture encounter-related quality and safety data. For each high priority goal, a working group was created to develop specific recommendations. The Data Warehousing subgroup has recommended the implementation of an architecture management process and an improved ability for users to get access to aggregate data. The Structured Documentation subgroup is establishing recommendations for a documentation template creation process. The strategic planning process at times is slow, but assures that the organization is focusing on the information technology activities most likely to lead to improved quality.
Implementation Plan for Qualification of Sodium-Cooled Fast Reactor Technology Information
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moe, Wayne; Honma, George
This document identifies and discusses implementation elements that can be used to facilitate consistent and systematic evaluation processes relating to quality attributes of technical information (with focus on SFR technology) that will be used to support licensing of advanced reactor designs. Information may include, but is not limited to, design documents for SFRs, research-and-development (R&D) data and associated documents, test plans and associated protocols, operations and test data, international research data, technical reports, and information associated with past U.S. Nuclear Regulatory Commission (NRC) reviews of SFR designs. The approach for determining acceptability of test data, analysis, and/or other technical informationmore » is based on guidance provided in INL/EXT-15-35805, “Guidance on Evaluating Historic Technology Information for Use in Advanced Reactor Licensing.” The implementation plan can be adopted into a working procedure at each of the national laboratories performing data qualification, or by applicants seeking future license application for advanced reactor technology.« less
Kuperman, Gilad J.; Boyer, Aurelia; Cole, Curt; Forman, Bruce; Stetson, Peter D.; Cooper, Mary
2006-01-01
At NewYork-Presbyterian Hospital, we are committed to the delivery of high quality care. We have implemented a strategic planning process to determine the information technology initiatives that will best help us improve quality. The process began with the creation of a Clinical Quality and IT Committee. The Committee identified 2 high priority goals that would enable demonstrably high quality care: 1) excellence at data warehousing, and 2) optimal use of automated clinical documentation to capture encounter-related quality and safety data. For each high priority goal, a working group was created to develop specific recommendations. The Data Warehousing subgroup has recommended the implementation of an architecture management process and an improved ability for users to get access to aggregate data. The Structured Documentation subgroup is establishing recommendations for a documentation template creation process. The strategic planning process at times is slow, but assures that the organization is focusing on the information technology activities most likely to lead to improved quality. PMID:17238381
National NIF Diagnostic Program Fiscal Year 2002 Second Quarter Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
MacGowan, B
Since October 2001 the development of the facility diagnostics for NIF has been funded by the NIF Director through the National NIF Diagnostic Program (NNDP). The current emphasis of the NNDP is on diagnostics for the early NIF quad scheduled to be available for experiment commissioning in FY03. During the past six months the NNDP has set in place processes for funding diagnostics, developing requirements for diagnostics, design reviews and monthly status reporting. Those processes are described in an interim management plan for diagnostics (''National NIF Diagnostic Program Interim Plan'', NIF-0081315, April 2002) and a draft Program Execution Plan (''Programmore » Execution Plan for the National NlF Diagnostic Program'', NIF-0072083, October 2001) and documents cited therein. Work has been funded at Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory (LANL), Naval Research Laboratory (NRL), Sandia National Laboratories (SNL), Bechtel Nevada at Los Alamos and Santa Barbara. There are no major technical risks with the early diagnostics. The main concerns relate to integration of the diagnostics into the facility, all such issues are being worked. This report is organized to show the schedule and budget status and a summary of Change Control Board actions for the past six months. The following sections then provide short descriptions of the status of each diagnostic. Where design reviews or requirements documents are cited, the documents are available on the Diagnostics file server or on request.« less
The Planning of In-Service Workshops: A Seminar (Atlanta, Feb. 14-17, 1971).
ERIC Educational Resources Information Center
Southern Regional Education Board, Atlanta, GA.
This document is a summation of a workshop designed to be a planning experience for ABE training personnel. It also contains a sampling of model training designs developed by the participants for inservice work. The object of the seminar was to provide an overview of relevant techniques and procedures for developing and implementing short-term…
ERIC Educational Resources Information Center
Fletcher, Jeffrey; Grant, Markeisha; Ramos, Marisol; Karp, Melinda Mechur
2016-01-01
This paper examines the current state of the literature on Integrated Planning and Advising for Student Success (iPASS), an increasingly popular approach to technology-mediated advising reform. We limit our analysis to sixty relevant documents that have been released since 2010. We categorize these items into four different groups based on their…
Nanotechnology-Enabled Optical Molecular Imaging of Breast Cancer
2008-07-01
explanation of results. 37 KEY RESEACH ACCOMPLISHMENTS • Design of needle-based fiber optic imaging system completed and development of first...policy or decision unless so designated by other documentation. REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 Public reporting...our results to date. As described in the Statement of Work, Year 1 plans focused on design of this system and beginning initial construction. It
Business planning: can the health service move from strategy into action?
Bennett, A R
1994-01-01
Advances the case for the use of one particular business planning technique within a National Health Service Trust. At the present time, NHS trusts are required to write strategic direction statements. Evidence suggests that these documents provide an accurate account of past performance and present position of the trust, but do not express the future position intended to be achieved. These documents also tend to be lengthy and lack strategic focus, which means that they are not helpful to managers who want clear organizational goals and objectives to which to work. Attempts to address the difficulties associated with determining how existing skills and resources can be used as the platform for future growth strategies by using the Ansoff Matrix and SWOT Analysis planning tools, given the external changes in the marketplace. Also attempts to shed light on some of the important links between busines strategy and management development by extending planning theory into practice.
1989-08-01
microproces;qor databaAing systems for monitoring project and contract reports and program technology trans. fers, coordinating and providing administratIvo ...The JWGD 3 annual planning process generally included: - Program review by the JWGD’ membership at quarterly meetings, which consisted of the review...Office developed the program planning and budget documents associated with the planning process outlined above. Program project databases and
Self Assessment Guidelines for Administrators of High School Cooperative Work Experience Programs.
ERIC Educational Resources Information Center
National Child Labor Committee, New York, NY.
A self-assessment questionnaire is presented in this document for use by high school administrators collecting information on which to base recommendations and plans for improving the effectiveness of cooperative work experience (CWE) programs. A format for assessment in each of the following areas is given: characteristics of students, staff, and…
Final Technical Report on the Institute for Advanced Study in Student Personnel Work.
ERIC Educational Resources Information Center
Callis, Robert
This document reports the planning, implementation, and evaluation of a 9-month institute held at the University of Missouri-Columbia to prepare participants (approximately 20) for leadership positions in student personnel work at junior colleges and technical institutes. The following aspects of the instructional program are discussed and…
ERIC Educational Resources Information Center
Griffiths, Jose-Marie; And Others
This document contains validated activities and competencies needed by librarians working in a database distributor/service organization. The activities of professionals working in database distributor/service organizations are listed by function: Database Processing; Customer Support; System Administration; and Planning. The competencies are…
Work Experience Employability Skills, Junior High.
ERIC Educational Resources Information Center
Mims, Murry; And Others
Educators have long recognized the need for schools to train students adequately for the world of work. This training includes both the necessary technical skills and employability skills. This document, the Employability Skills Guide, is Duval County Schools' part of such a plan to meet this need. The performance objectives utilized in this guide…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-11
... enforcement activities for oil and gas leases in their jurisdiction. The States and Indian Tribes are working... also must provide periodic accounting documentation to ONRR, including an annual work plan and... Tribes. Estimated Annual Reporting and Recordkeeping ``Hour'' Burden: 5,519 hours. We have not included...
Summary of External Peer Review and Public Comments and Disposition
This document summarizes the public and external peer review comments that the EPA’s Office of Pollution Prevention and Toxics (OPPT) received for the draft work plan risk assessment for n-Methylpyrrolidone (NMP).
Language Universalization for Improved Information Management: The Necessity for Esperanto.
ERIC Educational Resources Information Center
Jones, R. Kent
1978-01-01
Discusses problems for information management in dealing with multilingual documentation. The planned language, Esperanto, is suggested as a universal working language because of its neutrality, rational structure, clarity, and expressive power. (Author/CWM)
Tuomi, Jukka; Paloheimo, Kaija-Stiina; Vehviläinen, Juho; Björkstrand, Roy; Salmi, Mika; Huotilainen, Eero; Kontio, Risto; Rouse, Stephen; Gibson, Ian; Mäkitie, Antti A
2014-12-01
Additive manufacturing technologies are widely used in industrial settings and now increasingly also in several areas of medicine. Various techniques and numerous types of materials are used for these applications. There is a clear need to unify and harmonize the patterns of their use worldwide. We present a 5-class system to aid planning of these applications and related scientific work as well as communication between various actors involved in this field. An online, matrix-based platform and a database were developed for planning and documentation of various solutions. This platform will help the medical community to structurally develop both research innovations and clinical applications of additive manufacturing. The online platform can be accessed through http://www.medicalam.info. © The Author(s) 2014.
Bjerkan, Jorunn; Vatne, Solfrid; Hollingen, Anne
2014-01-01
Background and objective The Individual Care Plan (ICP) was introduced in Norway to meet new statutory requirements for user participation in health care planning, incorporating multidisciplinary and cross-sector collaboration. A web-based solution (electronic ICP [e-ICP]) was used to support the planning and documentation. The aim of this study was to investigate how web-based collaboration challenged user and professional roles. Methods Data were obtained from 15 semistructured interviews with users and eight with care professionals, and from two focus-group interviews with eight care professionals in total. The data were analyzed using systematic text condensation in a stepwise analysis model. Results Users and care professionals took either a proactive or a reluctant role in e-ICP collaboration. Where both user and care professionals were proactive, the pairing helped to ensure that the planning worked well; so did pairings of proactive care professionals and reluctant users. Proactive users paired with reluctant care professionals also made care planning work, thanks to the availability of information and the users’ own capacity or willingness to conduct the planning. Where both parties were reluctant, no planning activities occurred. Conclusion Use of the e-ICP challenged the user–professional relationship. In some cases, a power transition took place in the care process, which led to patient empowerment. This knowledge might be used to develop a new understanding of how role function can be challenged when users and care professionals have equal access to health care documentation and planning tools. PMID:25525367
1999-07-01
The Individual Education Plan and Individual Family Service Plan are legally mandated documents developed by a multidisciplinary team assessment that specifies goals and services for each child eligible for special educational services or early intervention services. Pediatricians need to be knowledgeable of federal, state, and local requirements; establish linkages with early intervention, educational professionals, and parent support groups; and collaborate with the team working with individual children.
14 CFR 77.2 - Definition of terms.
Code of Federal Regulations, 2010 CFR
2010-01-01
... planning document or military service military airport planning document. Precision instrument runway means... military airport layout plan; any other FAA planning document, or military service military airport planning document. Utility runway means a runway that is constructed for and intended to be used by...
KSC Press Site Transformer Bldg. (K7-1205c) SWMU 074 Interim Measure Work Plan
NASA Technical Reports Server (NTRS)
Starr, A. Scott; Applegate, Joe
2014-01-01
This document presents and discusses the Interim Measure (IM) Work Plan for the Press Site Transformer Building (K7-1205C). The purpose of the proposed IM activities is to remove soil affected with polychlorinated biphenyls (PCBs) greater than the Florida Department of Environmental Protection (FDEP) residential direct-exposure Soil Cleanup Target Level (R-SCTL) of 0.5 milligrams per kilogram and encapsulate concrete exhibiting PCB concentration greater than the Toxic Substance Control Act (TSCA) threshold of 50 milligrams per kilogram.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-07-01
This work plan/site safety and health plan is for the alpha sampling project at the Solid Waste Storage Area 4 bathtubbing trench. The work will be conducted by the Oak Ridge National Laboratory (ORNL) Environmental Sciences Division and associated ORNL environmental, safety, and health support groups. This activity will fall under the scope of 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response (HAZWOPER). The purpose of this document is to establish health and safety guidelines to be followed by all personnel involved in conducting work for this project. Work will be conducted in accordance with requirements as stipulated inmore » the ORNL HAZWOPER Program Manual and applicable ORNL; Martin Marietta Energy Systems, Inc.; and U.S. Department of Energy policies and procedures. The levels of protection and the procedures specified in this plan are based on the best information available from historical data and preliminary evaluations of the area. Therefore, these recommendations represent the minimum health and safety requirements to be observed by all personnel engaged in this project. Unforeseeable site conditions or changes in scope of work may warrant a reassessment of the stated protection levels and controls. All adjustments to the plan must have prior approval by the safety and health disciplines signing the original plan.« less
Summary of External Peer Review and Public Comments and Disposition for Trichloroethylene (TCE)
This document summarizes the public and external peer review comments that the EPA’s Office of Pollution Prevention and Toxics (OPPT) received for the draft work plan risk assessment for trichloroethylene (TCE).
Step 1: C3 Flight Demo Data Analysis Plan
NASA Technical Reports Server (NTRS)
2005-01-01
The Data Analysis Plan (DAP) describes the data analysis that the C3 Work Package (WP) will perform in support of the Access 5 Step 1 C3 flight demonstration objectives as well as the processes that will be used by the Flight IPT to gather and distribute the data collected to satisfy those objectives. In addition to C3 requirements, this document will encompass some Human Systems Interface (HSI) requirements in performing the C3 flight demonstrations. The C3 DAP will be used as the primary interface requirements document between the C3 Work Package and Flight Test organizations (Flight IPT and Non-Access 5 Flight Programs). In addition to providing data requirements for Access 5 flight test (piggyback technology demonstration flights, dedicated C3 technology demonstration flights, and Airspace Operations Demonstration flights), the C3 DAP will be used to request flight data from Non- Access 5 flight programs for C3 related data products
The development of a program analysis environment for Ada
NASA Technical Reports Server (NTRS)
Brown, David B.; Carlisle, Homer W.; Chang, Kai-Hsiung; Cross, James H.; Deason, William H.; Haga, Kevin D.; Huggins, John R.; Keleher, William R. A.; Starke, Benjamin B.; Weyrich, Orville R.
1989-01-01
A unit level, Ada software module testing system, called Query Utility Environment for Software Testing of Ada (QUEST/Ada), is described. The project calls for the design and development of a prototype system. QUEST/Ada design began with a definition of the overall system structure and a description of component dependencies. The project team was divided into three groups to resolve the preliminary designs of the parser/scanner: the test data generator, and the test coverage analyzer. The Phase 1 report is a working document from which the system documentation will evolve. It provides history, a guide to report sections, a literature review, the definition of the system structure and high level interfaces, descriptions of the prototype scope, the three major components, and the plan for the remainder of the project. The appendices include specifications, statistics, two papers derived from the current research, a preliminary users' manual, and the proposal and work plan for Phase 2.
Designing the Horizons of Your Small Business.
ERIC Educational Resources Information Center
Helgemo, Robert R.
This manual outlines the planning process for developing a feasibility study for a small business. The material is composed of three parts: the planning documents filled out for an imaginary campground; a business plan summarized from the planning documents; and blank planning documents with introductions and instructions. The documents can be…
Site support program plan for ICF Kaiser Hanford Company, Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-10-01
This document is the general administrative plan implemented by the Hanford Site contractor, ICF Kaiser Hanford Company. It describes the mission, administrative structure, projected staffing, to be provided by the contractor. The report breaks out the work responsibilities within the different units of the company, a baseline schedule for the different groups, and a cost summary for the different operating units.
ERIC Educational Resources Information Center
United Nations Economic and Social Commission for Asia and the Pacific, Bangkok (Thailand).
This monograph contains a study conducted by the Population Division of the United Nations Economic and Social Committee for Asia and the Pacific (ESCAP). The document is designed to aid policy-makers, administrators and evaluation personnel in family planning programs in the ESCAP region, primarily; and researchers working in the field of family…
Distributed Episodic Exploratory Planning (DEEP)
2012-04-01
other papers , reports and presentations, as referenced in the bibliography, and is only summarized in this report. 15. SUBJECT TERMS Planning...repository feature space. Much of the work is documented in detail in other papers , reports and presentations, as referenced in the bibliography, and is...DISTRIBUTION UNLIMITED 4 released in May 2006 a revolutionary vision paper titled “C2 Enabling Concepts” (Braun, 2006) depicting what a potential
The World of Barilla Taylor: Bringing History to Life through Primary Sources.
ERIC Educational Resources Information Center
Stearns, Liza
1997-01-01
Presents a lesson plan using material from a primary source-based curriculum kit titled "The World of Barilla Taylor." The kit uses personal letters, maps, hospital and work records, and other primary sources to document the life of a young woman working in the textile mills in 19th-century Massachusetts. (MJP)
"Learning to Play with New Friends": Systematic Quality Development Work in a Leisure-Time Centre
ERIC Educational Resources Information Center
Lager, Karin
2016-01-01
This article explores the recontextualisation of systematic quality development work (Sqdw) in a leisure-time centre. Two teachers' processes of planning, organisation, documentation and evaluation were investigated, the aim being to explore the recontextualisation of Sqdw in practice. The study is thus a case study of these teachers' practice…
NASA Technical Reports Server (NTRS)
Tuey, Richard C.; Collins, Mary; Caswell, Pamela; Haynes, Bob; Nelson, Michael L.; Holm, Jeanne; Buquo, Lynn; Tingle, Annette; Cooper, Bill; Stiltner, Roy
1996-01-01
This evaluation report contains an introduction, seven chapters, and five appendices. The Introduction describes the purpose, conceptual frame work, functional description, and technical report server of the STI Electronic Document Distribution (EDD) project. Chapter 1 documents the results of the prototype STI EDD in actual operation. Chapter 2 documents each NASA center's post processing publication processes. Chapter 3 documents each center's STI software, hardware, and communications configurations. Chapter 7 documents STI EDD policy, practices, and procedures. The appendices, which arc contained in Part 2 of this document, consist of (1) STI EDD Project Plan, (2) Team members, (3) Phasing Schedules, (4) Accessing On-line Reports, and (5) Creating an HTML File and Setting Up an xTRS. In summary, Stage 4 of the NASAwide Electronic Publishing System is the final phase of its implementation through the prototyping and gradual integration of each NASA center's electronic printing systems, desktop publishing systems, and technical report servers to be able to provide to NASA's engineers, researchers, scientists, and external users the widest practicable and appropriate dissemination of information concerning its activities and the result thereof to their work stations.
Wilson, Eleanor; Seymour, Jane E; Perkins, Paul
2010-06-01
Since October 2007 staff across health and social care services in England and Wales have been guided by the Mental Capacity Act (2005) in the provision of care for those who may lack capacity to make some decisions for themselves. This paper reports on the findings from a study with 26 staff members working in three palliative and three neurological care centres. Semistructured interviews were used to gain an understanding of their knowledge of the Mental Capacity Act, the issue of capacity itself and the documentation processes associated with the introduction of the Act and in line with advance care planning. Within this setting advance care planning is a key part of care provision and the mental capacity of service users is a regular issue. Findings show that staff generally had a good understanding of issues around capacity but felt unclear about some of the terminology related to the Mental Capacity Act, impacting on their confidence to discuss issues with service users and complete the documentation. Many felt the Act and its associated documentation had aided record-keeping in an area staff already delivered well in practice. Advance care planning in the context of the Mental Capacity Act is not as well embedded in practice as providers would like and consideration needs to be given to how and when staff should approach these issues with service users.
Sample Federal Facility Land Use Control ROD Checklist and Suggested Language (LUC Checklist)
The LUC Checklist provides direction on describing and documenting land use controls (LUCs) in federal facility actrions under CERCLA in Records of Decision (RODs), remedial designs (RDs), and remedial action work plans (RAWPs).
ERIC Educational Resources Information Center
World Wildlife Fund, Washington, DC.
This document features a lesson plan in which students work in teams to act out different ecosystem services, describe several free services that biodiversity provides to human, and explain how these services make life on earth possible. Samples of instruction and assessment are included. (KHR)
Antimony Trioxide (ATO) - Summary of External Peer Review and Public Comments and Disposition
This document summarizes the public and external peer review comments that the EPA’s Office of Pollution Prevention and Toxics (OPPT) received for the draft work plan risk assessment for Antimony Trioxide (ATO).
NASA Technical Reports Server (NTRS)
1981-01-01
The Kennedy Space Center (KSC) Management System for the Inertial Upper Stage (IUS) - spacecraft processing from KSC arrival through launch is described. The roles and responsibilities of the agencies and test team organizations involved in IUS-S/C processing at KSC for non-Department of Defense missions are described. Working relationships are defined with respect to documentation preparation, coordination and approval, schedule development and maintenance, test conduct and control, configuration management, quality control and safety. The policy regarding the use of spacecraft contractor test procedures, IUS contractor detailed operating procedures and KSC operations and maintenance instructions is defined. Review and approval requirements for each documentation system are described.
Government documents and the online catalog.
Lynch, F H; Lasater, M C
1990-01-01
Prior to planning for implementing the NOTIS system, the Vanderbilt Medical Center Library had not fully cataloged its government publications, and records for these materials were not in machine-readable format. A decision was made that patrons should need to look in only one place for all library materials, including the Health and Human Services Department publications received each year from the central library's Government Documents Unit. Beginning in 1985, these publications were added to the library's database, and the entire 7,200-piece collection is now in the online catalog. Working with these publications has taught the library much about the advantages and disadvantages of cataloging government documents in an online environment. It was found that OCLC cataloging copy is eventually available for most titles, although only about 10% of the records have MeSH headings. Staff time is the major expenditure; problems are caused by documents' irregular nature, frequent format changes, and difficult authority work. Since their addition to the online catalog, documents are used more and the library has better control.
Government documents and the online catalog.
Lynch, F H; Lasater, M C
1990-01-01
Prior to planning for implementing the NOTIS system, the Vanderbilt Medical Center Library had not fully cataloged its government publications, and records for these materials were not in machine-readable format. A decision was made that patrons should need to look in only one place for all library materials, including the Health and Human Services Department publications received each year from the central library's Government Documents Unit. Beginning in 1985, these publications were added to the library's database, and the entire 7,200-piece collection is now in the online catalog. Working with these publications has taught the library much about the advantages and disadvantages of cataloging government documents in an online environment. It was found that OCLC cataloging copy is eventually available for most titles, although only about 10% of the records have MeSH headings. Staff time is the major expenditure; problems are caused by documents' irregular nature, frequent format changes, and difficult authority work. Since their addition to the online catalog, documents are used more and the library has better control. PMID:2295010
Developing Headquarters Guidance for Army Installation Sustainability Plans in 2007
2009-01-01
Make a charitable contribution Support RAND This PDF document was made available from www.rand.org as a public service of the RAND Corporation . Jump...down to document The RAND Corporation is a nonprofit research organization providing objective analysis and effective solutions that address the...6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) RAND Corporation ,1776 Main
System integration test plan for HANDI 2000 business management system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilson, D.
This document presents the system integration test plan for the Commercial-Off-The-Shelf, PassPort and PeopleSoft software, and custom software created to work with the COTS products. The PP software is an integrated application for AP, Contract Management, Inventory Management, Purchasing and Material Safety Data Sheet. The PS software is an integrated application for Project Costing, General Ledger, Human Resources/Training, Payroll, and Base Benefits.
ERIC Educational Resources Information Center
Cahill, Kevin E.; Dyke, Andrew; Tapogna, John
2016-01-01
Oregon's Tier One Public Employees Retirement System (PERS) covered members prior to January 1, 1996. This "Issue Brief" documents the generosity of the money match provision under Oregon's Tier One plan relative to the Tier One defined-benefit formula, and relative to other plans in Oregon and Washington and to representative plans…
NASA Astrophysics Data System (ADS)
Stein, Thomas
Planetary data archives of surface missions contain data from numerous hosted instruments. Because of the nondeterministic nature of surface missions, it is not possible to assess the data without understanding the context in which they were collected. The PDS Analyst’s Notebook (http://an.rsl.wustl.edu) provides access to Mars Science Laboratory (MSL) data archives by integrating sequence information, engineering and science data, observation planning and targeting, and documentation into web-accessible pages to facilitate “mission replay.” In addition, Mars Exploration Rover (MER), Mars Phoenix Lander, Lunar Apollo surface mission, and LCROSS mission data are available in the Analyst’s Notebook concept, and a Notebook is planned for the Insight mission. The MSL Analyst’s Notebook contains data, documentation, and support files for the Curiosity rovers. The inputs are incorporated on a daily basis into a science team version of the Notebook. The public version of the Analyst’s Notebook is comprised of peer-reviewed, released data and is updated coincident with PDS data releases as defined in mission archive plans. The data are provided by the instrument teams and are supported by documentation describing data format, content, and calibration. Both operations and science data products are included. The operations versions are generated to support mission planning and operations on a daily basis. They are geared toward researchers working on machine vision and engineering operations. Science versions of observations from some instruments are provided for those interested in radiometric and photometric analyses. Both data set documentation and sol (i.e., Mars day) documents are included in the Notebook. The sol documents are the mission manager and documentarian reports that provide a view into science operations—insight into why and how particular observations were made. Data set documents contain detailed information regarding the mission, spacecraft, instruments, and data formats. In addition, observation planning and targeting information is extracted from each sol’s tactical science plan. A number of methods allow user access to the Notebook contents. The mission summary provides a high level overview of science operations. The Sol Summaries are the primary interface to integrated data and documents contained within the Notebooks. Data, documents, and planned observations are grouped for easy scanning. Data products are displayed in order of acquisition, and are grouped into logical sequences, such as a series of image data. Sequences and the individual products that comprise them may be viewed in detail, manipulated, and downloaded. Color composites and anaglyph stereo images may be created on demand. Graphs of some non-image data, such as spectra, may be viewed. Data may be downloaded as zip or gzip files, or as multiband ENVI image files. The Notebook contains a map with the rover traverse plotted on a HiRISE basemap using the raw and corrected drive telemetry provided by the project. Users may zoom and pan the map. Clicking on a traverse location brings up links to corresponding data. Three types of searching through data and documents are available within the Notebook. Free text searching of data set and sol documents are supported. Data are searchable by instrument, acquisition time, data type, and product ID. Results may be downloaded in a single collection or selected individually for detailed viewing. Additional resources include data set documents, references to published mission, links to related web resources, and online help. Finally, feedback is handled through an online forum. Work continues to improve functionality, including locating features of interest and a spectral library search/view/download tool. A number of Notebook functions are based on previous user suggestions, and feedback continues to be sought. The Analyst’s Notebook is available at http://an.rsl.wustl.edu.
Blackford, Jeanine; Street, Annette
2012-09-01
This article reports a study to determine the feasibility of an advance care planning model developed with Australian community palliative care services. An effective advance care planning programme involves an organizational wide commitment and preparedness for health service reform to embed advance care planning into routine practice. Internationally, such programmes have been implemented predominantly in aged and acute care with more recent work in primary care. A multi-site action research was conducted over a 16-month period in 2007-2009 with three Victorian community palliative care services. Using mixed method data collection strategies to assess feasibility, we conducted a baseline audit of staff and clients; analysed relevant documents (client records, policies, procedures and quality improvement strategies) pre-implementation and post-implementation and conducted key informant interviews (n = 9). Three community palliative care services: one regional and two metropolitan services in Victoria, Australia. The services demonstrated that it was feasible to embed the Model into their organizational structures. Advance care planning conversations and involvement of family was an important outcome measure rather than completion rate of advance care planning documents in community settings. Services adapted and applied their own concept of community, which widened the impact of the model. Changes to quality audit processes were essential to consolidate the model into routine palliative care practice. An advance care planning model is feasible for community palliative care services. Quality audit processes are an essential component of the Model with documentation of advance care planning discussion established as an important outcome measure. © 2011 Blackwell Publishing Ltd.
Code of Federal Regulations, 2011 CFR
2011-10-01
... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest 1409.506 Procedures. If the CO determines that contractor performance of the contemplated work is likely to create an organizational conflict of interest, then the contracting officer shall refer the documentation of the potential...
DOT National Transportation Integrated Search
1999-07-01
This document presents human factors guidelines for designers, owners operators, and planners involved in the development and operation of traffic management centers. Dimensions of the work environment affecting operator and system performance are ad...
36 CFR 219.30 - Plan documentation.
Code of Federal Regulations, 2010 CFR
2010-07-01
... also contains maps, monitoring and evaluation results, the annual monitoring and evaluation report, and... overall strategy for maintenance or restoration of sustainability, including desired conditions and... annual monitoring and evaluation report; and (6) A summary of the projected program of work, updated...
Strategic continuity planning: the first critical step.
Smith, Jack
2013-01-01
Many companies (and business continuity professionals) believe a company needs a comprehensive, all-inclusive business continuity plan. Often they reach this conclusion after other companies or potential clients have requested to see their business continuity plan as a precondition of doing business. Companies without 'a plan' are then tempted to go out and hire a business continuity person and tell them to 'Create a plan!' This makes perfect sense to the executive team, but this approach will probably not work in a real event. This paper addresses the shortcomings of producing tactical documentation and calling it 'The Plan', and discusses ways to engage management in the development of a corporate strategy to be used during and after an event.
Network speech systems technology program
NASA Astrophysics Data System (ADS)
Weinstein, C. J.
1981-09-01
This report documents work performed during FY 1981 on the DCA-sponsored Network Speech Systems Technology Program. The two areas of work reported are: (1) communication system studies in support of the evolving Defense Switched Network (DSN) and (2) design and implementation of satellite/terrestrial interfaces for the Experimental Integrated Switched Network (EISN). The system studies focus on the development and evaluation of economical and endurable network routing procedures. Satellite/terrestrial interface development includes circuit-switched and packet-switched connections to the experimental wideband satellite network. Efforts in planning and coordination of EISN experiments are reported in detail in a separate EISN Experiment Plan.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Holt, V.L.; Burgoa, B.B.
1993-12-01
This document is a site-specific work plan/health and safety checklist (WP/HSC) for a task of the Waste Area Grouping 2 Remedial Investigation and Site Investigation (WAG 2 RI&SI). Title 29 CFR Part 1910.120 requires that a health and safety program plan that includes site- and task-specific information be completed to ensure conformance with health- and safety-related requirements. To meet this requirement, the health and safety program plan for each WAG 2 RI&SI field task must include (1) the general health and safety program plan for all WAG 2 RI&SI field activities and (2) a WP/HSC for that particular field task.more » These two components, along with all applicable referenced procedures, must be kept together at the work site and distributed to field personnel as required. The general health and safety program plan is the Health and Safety Plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee (ORNL/ER-169). The WP/HSCs are being issued as supplements to ORNL/ER-169.« less
ERIC Educational Resources Information Center
Shuell, Julie; Hanna, Jeff; Oterlei, Jannell; Kariger, Patricia
This National Head Start Association booklet outlines the main provisions of the Personal Responsibility and Work Opportunity Act and describes how it may affect local Head Start Programs. The document is intended to serve as a starting point for local programs, parents, administrators and policy workers to discuss and plan how Head Start will…
DOT National Transportation Integrated Search
1997-06-18
This paper is the third in a series that together will comprise an Intelligent Transportation System Study (ITS) for the Buffalo/Niagara Falls region. In this document, the problems identified in Working Paper #1 are critically reviewed to develop go...
Zhao, Jialiang
2014-03-01
Action plan for the prevention of avoidable blindness and visual impairment for 2014-2019 endorsed by 66(th) World Health Assembly is an important document for promoting the global prevention of blindness. This action plan summarized the experiences and lessons in the global prevention of avoidable blindness and visual impairment from 2009 to 2013, raised the global goal for the prevention of blindness-the reduction in prevalence of avoidable visual impairment by 25% by 2019 from the baseline of 2010, set up the monitoring indicators for realizing the global goal. This document can be served as a roadmap to consolidate joint efforts aimed at working towards universal eye health in the world. This action plan must give a deep and important impact on the prevention of blindness in China.We should implement the action plan for the prevention of avoidable blindness and visual impairment for 2014-2019 to push forward sustaining development of the prevention of blindness in China.
Interactive dose shaping part 2: proof of concept study for six prostate patients
Ph Kamerling, Cornelis; Ziegenhein, Peter; Sterzing, Florian; Oelfke, Uwe
2016-01-01
Abstract Recently we introduced interactive dose shaping (IDS) as a new IMRT planning strategy. This planning concept is based on a hierarchical sequence of local dose modification and recovery operations. The purpose of this work is to provide a feasibility study for the IDS planning strategy based on a small set of six prostate patients. The IDS planning paradigm aims to perform interactive local dose adaptations of an IMRT plan without compromising already established valuable dose features in real-time. Various IDS tools were developed in our in-house treatment planning software Dynaplan and were utilized to create IMRT treatment plans for six patients with an adeno-carcinoma of the prostate. The sequenced IDS treatment plans were compared to conventionally optimized clinically approved plans (9 beams, co-planar). For each patient, several IDS plans were created, with different trade-offs between organ sparing and target coverage. The reference dose distributions were imported into Dynaplan. For each patient, the IDS treatment plan with a similar or better trade-off between target coverage and OAR sparing was selected for plan evaluation, guided by a physician. For this initial study we were able to generate treatment plans for prostate geometries in 15–45 min. Individual local dose adaptations could be performed in less than one second. The average differences compared to the reference plans were for the mean dose: 0.0 Gy (boost) and 1.2 Gy (PTV), for \\documentclass[12pt]{minimal} \\usepackage{amsmath} \\usepackage{wasysym} \\usepackage{amsfonts} \\usepackage{amssymb} \\usepackage{amsbsy} \\usepackage{upgreek} \\usepackage{mathrsfs} \\setlength{\\oddsidemargin}{-69pt} \\begin{document} }{}${{D}_{98\\%}}:-1.1$ \\end{document}D98%:−1.1 Gy and for \\documentclass[12pt]{minimal} \\usepackage{amsmath} \\usepackage{wasysym} \\usepackage{amsfonts} \\usepackage{amssymb} \\usepackage{amsbsy} \\usepackage{upgreek} \\usepackage{mathrsfs} \\setlength{\\oddsidemargin}{-69pt} \\begin{document} }{}${{D}_{2\\%}}:1.1$ \\end{document}D2%:1.1 Gy (both target volumes). The dose-volume quality indicators were well below the Quantec constraints. However, we also observed limitations of our currently implemented approach. Most prominent was an increase of the non-tumor integral dose by 16.4% on average, demonstrating that further developments of our planning strategy are required. PMID:26948274
JPRS Report, Soviet Union, Political Affairs.
1988-10-21
broadcasts on the problems of bringing to life each resolution and other documents of the party conference. The special work groups for preparing...regular Lithuanian CP Central Committee Plenum which is planned for the end of September. Its topic will be "On reorganizing the work of the republic’s...mented quickly, yet the creation of conditions for return- ing our sons required and will still require long and complex work . Let us take another
DOT National Transportation Integrated Search
2001-05-01
The purpose of this working paper is to provide an estimate of the federal proportion of funds expended on intelligent transportation systems (ITS) infrastructure deployments for fiscal year (FY) 2000 using budget and planning data from state departm...
100-F Target Analyte List Development for Soil
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ovink, R.
2012-09-18
This report documents the process used to identify source area target analytes in support of the 100-F Area remedial investigation/feasibility study (RI/FS) addendum to the Integrated 100 Area Remedial Investigation/Feasibility Study Work Plan (DOE/RL-2008-46, Rev. 0).
100-K Target Analyte List Development for Soil
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ovink, R.
2012-09-18
This report documents the process used to identify source area target analytes in support of the 100-K Area remedial investigation/feasibility study (RI/FS) addendum to the Integrated 100 Area Remedial Investigation/Feasibility Study Work Plan (DOE/RL-2008-46, Rev. 0).
Accident casualty reporting and recording by DOT modal agencies : a background paper
DOT National Transportation Integrated Search
2001-06-30
This report was prepared in support of the Safety Data Action Plan (SDAP) sponsored by the Bureau of Transportation Statistics (BTS). This document supports the working group responsible for SDAP research project #2 - Develop Common Criteria for Repo...
NASA Technical Reports Server (NTRS)
2005-01-01
The purpose of this document is to present the findings that resulted from a high-level analysis and evaluation of the following documents: (1) The OEP (Operational Evolution Plan) Version 7 -- a 10-year plan for operational improvements to increase capacity and efficiency in U.S. air travel and transport and other use of domestic airspace. The OEP is the FAA commitment to operational improvements. It is outcome driven, with clear lines of accountability within FAA organizations. The OEP concentrates on operational solutions and integrates safety, certification, procedures, staffing, equipment, avionics and research; (2) The Draft Flight Plan 2006 through 2010 -- a multi-year strategic effort, setting a course for the FAA through 2001, to provide the safest and most efficient air transportation system in the world; (3) The NAS System Architecture Version 5 -- a blueprint for modernizing the NAS and improving NAS services and capabilities through the year 2015; and (4) The NAS-SR-1000 System Requirements Specification (NASSRS) -- a compilation of requirements which describe the operational capabilities for the NAS. The analysis is particularly focused on examining the documents for relevance to existing and/or planned future UAV operations. The evaluation specifically focuses on potential factors that could materially affect the development of a commercial ROA industry, such as: (1) Design limitations of the CNS/ATM system, (2) Human limitations, The information presented was taken from program specifications or program office lead personnel.
Holm, Solrun G; Angelsen, Ragnhild O
2014-09-26
Home care services in Norway are provided for free, and municipalities are responsible for their provision to all those in need of them, in accordance with the Act on Municipal Health and Care Services. The costs of home care services are increasing. Many municipalities are now working to find the best cost-effective solutions to ensure that home care services are of sufficient quality but still affordable. This paper describes how nurses and health workers spend their working time, with a hypothesis that driving time and time required to document details of the care given are underestimated in weekly planning schedules. This article sets out a descriptive retrospective study of day-schedules and driving routes for staff working in home care services. Data were analyzed using GIS. The driving time was between 18% and 26% of working time in municipality A, and between 21% and 23% in municipality B. Visiting time varied between 44% and 62% in municipality A, and 40% and 56% in municipality B. Other tasks, including the legally-required documentation of the care given, varied between 19% and 32% in municipality A and 21% and 38% in municipality B. Overall, 22% of the driving routes in municipality A, and 14% in municipality B, took more time than expected. In municipality A, 22% of the day-schedules underestimated overtime; this figure was 14% in municipality B. In home care services, time taken for driving and to write statutory documentation seems to have been underestimated. Better planning and organization of driving routes would reduce driving time and allow more time for other necessary work.
SU-E-T-201: Safety-Focused Customization of Treatment Plan Documentation.
Schubert, L; Westerly, D; Stuhr, K; Miften, M
2012-06-01
Plan report documentation contains numerous details about the treatment plan, but critical information for patient safety is often presented without special emphasis. This can make it difficult to detect errors from treatment planning and data transfer during the initial chart review. The objective of this work is to improve safety measures in radiation therapy practice by customizing the treatment plan report to emphasize safety-critical information. Commands within the template file from a commercial planning system (Eclipse, Varian Medical Systems) that automatically generates the treatment plan report were reviewed and modified. Safety-critical plan parameters were identified from published risks known to be inherent in the treatment planning process. Risks having medium to high potential impact on patient safety included incorrect patient identifiers, erroneous use of the treatment prescription, and incorrect transfer of beam parameters or consideration of accessories. Specific examples of critical information in the treatment plan report that can be overlooked during a chart review included prescribed dose per fraction and number of fractions, wedge and open field monitor units, presence of beam accessories, and table shifts for patient setup. Critical information was streamlined and concentrated. Patient and plan identification, dose prescription details, and patient positioning couch shift instructions were placed on the first page. Plan information to verify the correct data transfer to the record and verify system was re-organized in an easy to review tabular format and placed in the second page of the customized printout. Placeholders were introduced to indicate both the presence and absence of beam modifiers. Font sizes and spacing were adjusted for clarity, and departmental standards and terminology were introduced to streamline data communication among staff members. Plan reporting documentation has been customized to concentrate and emphasize safety-critical information, which should allow for a more efficient, robust chart review process. © 2012 American Association of Physicists in Medicine.
Drift-Scale Coupled Processes (DST and THC Seepage) Models
DOE Office of Scientific and Technical Information (OSTI.GOV)
P. Dixon
The purpose of this Model Report (REV02) is to document the unsaturated zone (UZ) models used to evaluate the potential effects of coupled thermal-hydrological-chemical (THC) processes on UZ flow and transport. This Model Report has been developed in accordance with the ''Technical Work Plan for: Performance Assessment Unsaturated Zone'' (Bechtel SAIC Company, LLC (BSC) 2002 [160819]). The technical work plan (TWP) describes planning information pertaining to the technical scope, content, and management of this Model Report in Section 1.12, Work Package AUZM08, ''Coupled Effects on Flow and Seepage''. The plan for validation of the models documented in this Model Reportmore » is given in Attachment I, Model Validation Plans, Section I-3-4, of the TWP. Except for variations in acceptance criteria (Section 4.2), there were no deviations from this TWP. This report was developed in accordance with AP-SIII.10Q, ''Models''. This Model Report documents the THC Seepage Model and the Drift Scale Test (DST) THC Model. The THC Seepage Model is a drift-scale process model for predicting the composition of gas and water that could enter waste emplacement drifts and the effects of mineral alteration on flow in rocks surrounding drifts. The DST THC model is a drift-scale process model relying on the same conceptual model and much of the same input data (i.e., physical, hydrological, thermodynamic, and kinetic) as the THC Seepage Model. The DST THC Model is the primary method for validating the THC Seepage Model. The DST THC Model compares predicted water and gas compositions, as well as mineral alteration patterns, with observed data from the DST. These models provide the framework to evaluate THC coupled processes at the drift scale, predict flow and transport behavior for specified thermal-loading conditions, and predict the evolution of mineral alteration and fluid chemistry around potential waste emplacement drifts. The DST THC Model is used solely for the validation of the THC Seepage Model and is not used for calibration to measured data.« less
ERIC Educational Resources Information Center
Spencer, Richard L.; And Others
Within this document, and presented in their entirety, are five reports which depict differing views of Delaware County Community College (DCCC) from 1974 through 1980. The reports consist of both historical and predictive data, evolved from staff work related to long and short range planning. The general framework for this activity revolved about…
Rivero, Antonio; Pulido, Federico; Caylá, Joan; Iribarren, José A; Miró, José M; Moreno, Santiago; Pérez-Camacho, Inés
2013-12-01
This consensus document was prepared by an expert panel of the Grupo de Estudio de Sida (GESIDA [Spanish AIDS Study Group]) and the Plan Nacional sobre el Sida (PNS [Spanish National AIDS Plan]). The document updates current guidelines on the treatment of tuberculosis (TB) in HIV-infected individuals contained in the guidelines on the treatment of opportunistic infections published by GESIDA and PNS in 2008. The document aims to facilitate the management and treatment of HIV-infected patients with TB in Spain, and includes specific sections and recommendations on the treatment of drug-sensitive TB, multidrug-resistant TB, and extensively drug-resistant TB, in this population. The consensus guidelines also make recommendations on the treatment of HIV-infected patients with TB in special situations, such as chronic liver disease, pregnancy, kidney failure, and transplantation. Recommendations are made on the timing and initial regimens of antiretroviral therapy in patients with TB, and on immune reconstitution syndrome in HIV-infected patients with TB who are receiving antiretroviral therapy. The document does not cover the diagnosis of TB, diagnosis/treatment of latent TB, or treatment of TB in children. The quality of the evidence was evaluated and the recommendations graded using the approach of the Grading of Recommendations Assessment, Development and Evaluation Working Group. Copyright © 2013 Elsevier España, S.L. All rights reserved.
Web Application Software for Ground Operations Planning Database (GOPDb) Management
NASA Technical Reports Server (NTRS)
Lanham, Clifton; Kallner, Shawn; Gernand, Jeffrey
2013-01-01
A Web application facilitates collaborative development of the ground operations planning document. This will reduce costs and development time for new programs by incorporating the data governance, access control, and revision tracking of the ground operations planning data. Ground Operations Planning requires the creation and maintenance of detailed timelines and documentation. The GOPDb Web application was created using state-of-the-art Web 2.0 technologies, and was deployed as SaaS (Software as a Service), with an emphasis on data governance and security needs. Application access is managed using two-factor authentication, with data write permissions tied to user roles and responsibilities. Multiple instances of the application can be deployed on a Web server to meet the robust needs for multiple, future programs with minimal additional cost. This innovation features high availability and scalability, with no additional software that needs to be bought or installed. For data governance and security (data quality, management, business process management, and risk management for data handling), the software uses NAMS. No local copy/cloning of data is permitted. Data change log/tracking is addressed, as well as collaboration, work flow, and process standardization. The software provides on-line documentation and detailed Web-based help. There are multiple ways that this software can be deployed on a Web server to meet ground operations planning needs for future programs. The software could be used to support commercial crew ground operations planning, as well as commercial payload/satellite ground operations planning. The application source code and database schema are owned by NASA.
Pöder, Ulrika; Fogelberg-Dahm, Marie; Wadensten, Barbro
2011-09-01
To compare staff opinions about standardized care plans and self-reported habits with regard to documentation, and their perceived knowledge about the evidence-based guidelines in stroke care before and after implementation of an evidence-based-standardized care plan (EB-SCP) and quality standard for stroke care. The aim was also to describe staff opinions about, and their use of, the implemented EB-SCP. To facilitate evidence-based practice (EBP), a multi-professional EB-SCP and quality standard for stroke care was implemented in the electronic health record (EHR). Quantitative, descriptive and comparative, based on questionnaires completed before and after implementation. Perceived knowledge about evidence-based guidelines in stroke care increased after implementation of the EB-SCP. The majority agreed that the EB-SCP is useful and facilitates their work. There was no change between before and after implementation with regard to opinions about standardized care plans, self-reported documentation habits or time spent on documentation. An evidence-based SCP seems to be useful in patient care and improves perceived knowledge about evidence-based guidelines in stroke care. For nursing managers, introduction of evidence-based SCP in the EHR may improve the prerequisites for promoting high-quality EBP in multi-professional care. 2011 Blackwell Publishing Ltd.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
Pollution Prevention (P2) has evolved into one of DOE`s sprime strategies to meet environmental, fiscal, and worker safety obligations. P2 program planning, opportunity identification, and implementation tools were developed under the direction of the Waste Minimization Division (EM-334). Forty experts from EM, DP, ER and DOE subcontractors attended this 2-day workshop to formulate the incentives to drive utilization of these tools. Plenary and small working group sessions were held both days. Working Group 1 identified incentives to overcoming barriers in the area of P2 program planning and resource allocation. Working Group 2 identified mechanisms to drive the completion of P2more » assessments and generation of opportunities. Working Group 3 compiled and documented a broad range of potential P2 incentives that address fundamental barriers to implementation of cost effective opportunities.« less
NASA Technical Reports Server (NTRS)
Ruff, Gary A.
2003-01-01
The purpose of the workshop documented in this publication was to bring together personnel responsible for the design and operations of the International Space Station (ISS) and the fire protection research community to review the current knowledge in fire safety relative to spacecraft. From this review, research needs were identified that were then used to formulate a research plan with specific objectives. In this document, I have attempted to capture the very informative and lively discussions that occurred in the plenary sessions and the working groups. I hope that it will be useful to readers and serve as a significant step in assuring fire protection for the crews of current and future spacecraft.
Volcanic Hazard Maps; the results and progress made by the IAVCEI Hazard Map working group
NASA Astrophysics Data System (ADS)
Calder, Eliza; Lindsay, Jan; Wright, Heather
2017-04-01
The IAVCEI Commission on Volcanic Hazards and Risk set up a working group on Hazard Maps in 2014. Since then, the group has led or co-organised three major workshops, and organized two thematic conference sessions. In particular we have initiated a series of workshops, named the "State of the Hazard Map" which we plan to continue (the first was held at COV8 (State of the Hazard Map 1) and second at COV9 (State of the Hazard Map 2) and the third will be held at IAVCEI General Assembly in Portland. The broad aim of these activities is to work towards an IAVCEI-endorsed considerations or guidelines document for volcanic hazard map generation. The workshops have brought together people from around the world working on volcanic hazard maps, and have had four primary objectives: 1) to review (and collect further data on) the diverse variety of methods and rationales currently used to develop maps; 2) to openly discuss approaches and experiences regarding how hazard maps are interpreted and used by different groups; 3) to discuss and prepare the IAVCEI Guidelines document; and lastly, 4) Discuss options for finalizing, publishing and disseminating the Guidelines document (e.g. wiki, report, open-source publication). This presentation will provide an update of the results and outcomes of those initiatives. This includes brief outcomes of the reviews undertaken, a survey that has been constructed in order to gather additional data, the planned structure for the guidelines documents and a summary of the key findings to date. The majority of the participants of these activities so far have come from volcano observatories or geological surveys, as these institutions commonly have primary responsibility for making operational hazard map. It is important however that others in the scientific community that work on quantification of volcanic hazard contribute to these guidelines. We therefore invite interested parties to become involved.
ERIC Educational Resources Information Center
St. Denis, Gerald C., Ed.
This document contains a list of planning committee members, institute participants, an introduction by Gerald C. St. Denis a program agenda, and institute presentations from this conference. The following presentations are included: (1) "Social Factors in the Health of Families: A Public Health Social Work Responsibility" (Stanley F. Battle); (2)…
ERIC Educational Resources Information Center
Micou, Ann McKinstry
This handbook explores Europe's nonprofit nongovernmental organizations (NGOs) that have been working for change in South Africa and now are engaged, or planning to engage in the economic, social, and human resource development of a democratic South Africa. The purposes of the document are to: (1) illuminate for both donor agencies and groups…
Annual Report on Operations, 1999-2000.
ERIC Educational Resources Information Center
Australian National Training Authority, Brisbane.
This report, the Australian National Training Authority's (ANTA's) key reporting and accounting document, focuses on internal operations structured around the annual ANTA Plan and work priorities. A "Chairman's Comment" (Stuart Hornery) and "From the CEO's Desk" (Moira Scollay) precede an overview that provides a history of…
Automated Procurement System (APS): Project management plan (DS-03), version 1.2
NASA Technical Reports Server (NTRS)
Murphy, Diane R.
1994-01-01
The National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC) is implementing an Automated Procurement System (APS) to streamline its business activities that are used to procure goods and services. This Project Management Plan (PMP) is the governing document throughout the implementation process and is identified as the APS Project Management Plan (DS-03). At this point in time, the project plan includes the schedules and tasks necessary to proceed through implementation. Since the basis of APS is an existing COTS system, the implementation process is revised from the standard SDLC. The purpose of the PMP is to provide the framework for the implementation process. It discusses the roles and responsibilities of the NASA project staff, the functions to be performed by the APS Development Contractor (PAI), and the support required of the NASA computer support contractor (CSC). To be successful, these three organizations must work together as a team, working towards the goals established in this Project Plan. The Project Plan includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.
NASA Technical Reports Server (NTRS)
1984-01-01
The work breakdown structure (WBS) for the Space Platform Expendables Resupply Concept Definition Study is described. The WBS consists of a list of WBS elements, a dictionary of element definitions, and an element logic diagram. The list and logic diagram identify the interrelationships of the elements. The dictionary defines the types of work that may be represented by or be classified under each specific element. The Space Platform Expendable Resupply WBS was selected mainly to support the program planning, scheduling, and costing performed in the programmatics task (task 3). The WBS is neither a statement-of-work nor a work authorization document. Rather, it is a framework around which to define requirements, plan effort, assign responsibilities, allocate and control resources, and report progress, expenditures, technical performance, and schedule performance. The WBS element definitions are independent of make-or-buy decisions, organizational structure, and activity locations unless exceptions are specifically stated.
20 CFR 668.710 - What planning documents must an INA grantee submit?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false What planning documents must an INA grantee... Planning/Funding Process § 668.710 What planning documents must an INA grantee submit? Each grantee... participant services and expenditures covering the two-year planning cycle. We will, in consultation with the...
Davidson, Anne; McKerrow, Alexa; Long, Don; Earnhardt, Todd
2015-01-01
The intended target audience for this document initially is management and project technical specialist and scientists involved in the Gap Analysis Program (GAP) and the Landscape Fire and Resource Management Planning Tools - (LANDFIRE) program to help communicate coordination activities to all involved parties. This document is also intended to give background information in other parts of the USGS and beyond, although some details given are relatively oriented to management of the respective programs. Because the Gap Analysis Program (GAP) and the Landscape Fire and Resource Management Planning Tools - LANDFIRE programs both rely on characterizations of land cover using similar scales and resolutions, the programs have been coordinating their work to improve scientific consistency and efficiency of production. Initial discussions and informal sharing of ideas and work began in 2008. Although this collaboration was fruitful, there was no formal process for reporting results, plans, or outstanding issues, nor was there any formally-defined coordinated management team that spanned the two programs. In 2012, leadership from the two programs agreed to strengthen the coordination of their respective work efforts. In 2013 the GAP and LANDFIRE programs developed an umbrella plan of objectives and components related to three mutual focus areas for the GAP and LANDFIRE collaboration for the years 2013 and 2014 (GAP/LANDFIRE 2013). The evolution of this partnership resulted in the drafting of an inter-program Memorandum of Understanding (MOU) in 2014. This MOU identified three coordination topics relevant to the two programs participating at this point in the MOU history: Vegetation mappingDisturbance classesFormal quality assessment
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaFreniere, Lorraine M.
In 2008-2009, to address the carbon tetrachloride contamination detected on its former property, the CCC/USDA implemented a source area cleanup in accord with the document Interim Measure Work Plan/Design for Agra, Kansas (IMWP/D; Argonne 2008). The cleanup involves five large-diameter boreholes (LDBs) coupled with soil vapor extraction (SVE) and air sparge (AS) systems. The work plan was approved by the Kansas Department of Health and Environment (KDHE) in November 2008 (KDHE 2008b), and operation began in May 2009.
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaFreniere, Lorraine
In 2008-2009, to address the carbon tetrachloride contamination detected on its former property, the CCC/USDA implemented a source area cleanup in accord with the document Interim Measure Work Plan/Design for Agra, Kansas (IMWP/D; Argonne 2008). The cleanup involves five large-diameter boreholes (LDBs) coupled with soil vapor extraction (SVE) and air sparging (AS). The work plan was approved by the Kansas Department of Health and Environment (KDHE) in November 2008 (KDHE 2008b), and operation began in May 2009.
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaFreniere, Lorraine M.
In 2008-2009, to address the carbon tetrachloride contamination detected on its former property, the CCC/USDA implemented a source area cleanup in accord with the document Interim Measure Work Plan/Design for Agra, Kansas (IMWP/D; Argonne 2008). The cleanup involves five large-diameter boreholes (LDBs) coupled with soil vapor extraction (SVE) and air sparge (AS) systems. The work plan was approved by the Kansas Department of Health and Environment (KDHE) in November 2008 (KDHE 2008b), and operation began in May 2009.
Management of technical date in Nihon Doro kodan
NASA Astrophysics Data System (ADS)
Hanada, Jun'ichi
Nihon Doro Kodan Laboratory has collected and contributed technical data (microfiches, aerial photographs, books and literature) on plans, designs, constructions and maintenance of the national expressways and the ordinary toll roads since 1968. This work is systematized on computer to retrieve and contribute data faster. Now Laboratory operates Technical Data Management System which manages all of technical data and Technical Document Management System which manages technical documents. These systems stand on users' on-line retrieval and data accumuration by microfiches and optical disks.
RMA Abandoned Well Closure Program. Final Task Plan, Version 3.0.
1989-05-01
20503. 1 . AGENCY USE ONLY (Leave blank) 2. REPORT DATE" 0 3. REPORT TYPE AND DATES COVERED _T 05/00/89 __________________ 4. TITLE AND SUBTITLE S...AQUIFERS. THE SCOPE OF WORK INCLUDES: 1 . COMPILATION OF A WELL INVENTORY AND DATABASE 2. FIELD LOCATION OF WELLS 3. CLEANING AND CLOSURE OF...APPROXIMATELY 350 WELT- 4. DOCUMENTATION OF CLOSURE ACTIVITIES. SECTIONS OF THIS TASK PLAN DETAIL-INFORMATION ON: 1 . ABANDONED WELL IDENTIFICATION AND LOCATION
ERIC Educational Resources Information Center
Ashbrook, Peggy
2006-01-01
Young children do science exploration and observation every day in their play. They spontaneously engage in parts of the scientific inquiry process--wondering, asking a question, planning how to answer the question, documenting their work, thinking about what happened, and sharing their results with others. Conducting an entire experiment is…
Code of Federal Regulations, 2010 CFR
2010-10-01
... ACQUISITION PLANNING Contractor Versus Government Performance 907.307 Appeals. An appeal of a decision to convert to contract or to continue in-house performance may be made by an affected party. Appeals shall be... A-76, and be supported by appropriate documentation. Appeals must be delivered within 15 working...
EXTENSION METHODS IDEAS FOR RURAL CIVIL DEFENSE.
ERIC Educational Resources Information Center
Department of Agriculture, Washington, DC.
TECHNIQUES FOR INVOLVING THE RURAL POPULATION IN CIVIL DEFENSE PLANNING IS THE SUBJECT OF THIS DOCUMENT. AN INITIAL STEP INVOLVES DETERMINING THE VARIOUS COMMUNICATION SKILLS TO BE USED. METHODS OF WORKING WITH COMMUNITY ORGANIZATIONS, MASS MEDIA TECHNIQUES, AND CONSTRUCTION OF EXHIBITS ARE DESCRIBED. SMALL GROUP DISCUSSION TECHNIQUES EXPLAINED…
100-N Area Decision Unit Target Analyte List Development for Soil
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ovink, R.
2012-09-18
This report documents the process used to identify source area target analytes in support of the 100-N Area remedial investigation/feasibility study (RI/FS) addendum to the Integrated 100 Area Remedial Investigation/Feasibility Study Work Plan (DOE/RL-2008-46, Rev. 0).
ERIC Educational Resources Information Center
European Training Foundation, Turin (Italy).
This document provides a general overview, in broad terms, of the activities of the European Training Foundation (ETF) planned for 2001 and beyond. Section 1 presents ETF activities under four main headings: obligatory activities; support to the European Commission; information provision and analysis; and development activities. It also provides a…
Helping Your Students To Understand Complex Social Problems.
ERIC Educational Resources Information Center
Valentine, Tom, Ed.; Sandlin, Jenny, Ed.
1998-01-01
This document, which was developed to assist individuals working in publicly sponsored literacy programs in Georgia, offers instructional plans and practical strategies designed to help teachers help students of adult literacy, adult basic education, General Educational Development, and English as a second language understand complex social…
Semantic Metadata for Heterogeneous Spatial Planning Documents
NASA Astrophysics Data System (ADS)
Iwaniak, A.; Kaczmarek, I.; Łukowicz, J.; Strzelecki, M.; Coetzee, S.; Paluszyński, W.
2016-09-01
Spatial planning documents contain information about the principles and rights of land use in different zones of a local authority. They are the basis for administrative decision making in support of sustainable development. In Poland these documents are published on the Web according to a prescribed non-extendable XML schema, designed for optimum presentation to humans in HTML web pages. There is no document standard, and limited functionality exists for adding references to external resources. The text in these documents is discoverable and searchable by general-purpose web search engines, but the semantics of the content cannot be discovered or queried. The spatial information in these documents is geographically referenced but not machine-readable. Major manual efforts are required to integrate such heterogeneous spatial planning documents from various local authorities for analysis, scenario planning and decision support. This article presents results of an implementation using machine-readable semantic metadata to identify relationships among regulations in the text, spatial objects in the drawings and links to external resources. A spatial planning ontology was used to annotate different sections of spatial planning documents with semantic metadata in the Resource Description Framework in Attributes (RDFa). The semantic interpretation of the content, links between document elements and links to external resources were embedded in XHTML pages. An example and use case from the spatial planning domain in Poland is presented to evaluate its efficiency and applicability. The solution enables the automated integration of spatial planning documents from multiple local authorities to assist decision makers with understanding and interpreting spatial planning information. The approach is equally applicable to legal documents from other countries and domains, such as cultural heritage and environmental management.
Armour, Mark
Dwight D. Eisenhower is often quoted as saying: 'In battle, plans are useless but planning is indispensable'. How many in the business continuity profession actually think about that statement and what it really means? Audit, compliance and regulatory requirements as well as the expectations of executives and business leaders result in an inordinate amount of time and effort devoted to plan development with scant attention paid to actual planning. Practitioners need to realise that the value of the plans they develop is not derived from the finished documents but from the work devoted to completing them. Experience and practice win out above detailed plans. One need look no further than Eisenhower's D-Day invasion of Normandy as evidence. Practitioners need to learn how to be better at instituting preparedness and not simply developing better plans.
Reports of planetary astronomy, 1985
NASA Technical Reports Server (NTRS)
1986-01-01
This is a compilation of abstracts of reports from Principal Investigators funded through NASA's Planetary Astronomy Program, Office of Space Science and Applications. The purpose is to provide a document which succinctly summarizes work conducted in this program for 1985. Each report contains a brief statement on the strategy of investigation and lists significant accomplishments within the area of the author's funded grant or contract, plans for future work, and publications.
Reports of planetary astronomy, 1986
NASA Technical Reports Server (NTRS)
1987-01-01
A compilation of abstracts of reports from Principal Investigators funded through NASA's Planetary Astronomy Program, Office of Space Science and Applications, is presented. The purpose is to provide a document which succinctly summarizes work conducted in this program for 1986. Each report contains a brief statement on the strategy of investigation and lists significant accomplishments within the area of the author's funded grant or contract, plans for future work, and publications.
20 CFR 669.510 - What planning documents must an NFJP grantee submit?
Code of Federal Regulations, 2014 CFR
2014-04-01
... 20 Employees' Benefits 4 2014-04-01 2014-04-01 false What planning documents must an NFJP grantee submit? 669.510 Section 669.510 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF... Performance Accountability, Planning and Waiver Provision § 669.510 What planning documents must an NFJP...
32 CFR 813.6 - Planning and requesting combat documentation.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Joint Operation Planning and Execution System, that in turn, requests support from HQ AMC. HQ USAF can... 32 National Defense 6 2010-07-01 2010-07-01 false Planning and requesting combat documentation... SALES AND SERVICES VISUAL INFORMATION DOCUMENTATION PROGRAM § 813.6 Planning and requesting combat...
36 CFR 219.14 - Decision document and planning records.
Code of Federal Regulations, 2012 CFR
2012-07-01
... planning records. 219.14 Section 219.14 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF... records. (a) Decision document. The responsible official shall record approval of a new plan, plan... (§ 219.15); (4) The documentation of how the best available scientific information was used to inform...
36 CFR 219.14 - Decision document and planning records.
Code of Federal Regulations, 2014 CFR
2014-07-01
... planning records. 219.14 Section 219.14 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF... records. (a) Decision document. The responsible official shall record approval of a new plan, plan... (§ 219.15); (4) The documentation of how the best available scientific information was used to inform...
Enhancements to and Applications with the "Unified" Long-Term PSC Database
NASA Technical Reports Server (NTRS)
Fromm, Michael; Alfred, Jerome
2004-01-01
This report summaries the project team's activity during the period 1 January - 31 March 2004. It consists of a project plan, which was completed during this period and an indication of the completion status of each phase of the project. The intention of the investigative team is to closely follow the statement of work documented in our proposal. For this reason, the proposal may be referenced in this and upcoming status reports. This project got underway in this quarter. Our activity was to formulate a project plan and to engage in planning meetings with collaborators.
Anhydrous Ammonia Training Module. Trainer's Package. Participant's Package.
ERIC Educational Resources Information Center
Beaudin, Bart; And Others
This document contains a trainer's and a participant's package for teaching employees on site safe handling procedures for working with anhydrous ammonia, especially on farms. The trainer's package includes the following: a description of the module; a competency; objectives; suggested instructional aids; a training outline (or lesson plan) for…
Citizen Participation in Urban Development. Volume 2. Cases and Programs.
ERIC Educational Resources Information Center
Spiegel, Hans B.C., Ed.
The successor to a volume on concepts and issues in urban citizen participation, this work documents selected patterns of participation, issues that trigger participation (school decentralization, housing needs, a proposed highway, and other crisis situations), and outside assistance as embodied in urban planning advocates, community development…
Managemant of NASA's major projects
NASA Technical Reports Server (NTRS)
James, L. B.
1973-01-01
Approaches used to manage major projects are studied and the existing documents on NASA management are reviewed. The work consists of: (1) the project manager's role, (2) request for proposal, (3) project plan, (4) management information system, (5) project organizational thinking, (6) management disciplines, (7) important decisions, and (8) low cost approach.
36 CFR 1254.102 - What requests does NARA not approve?
Code of Federal Regulations, 2011 CFR
2011-07-01
... publication or which relate closely to other documents previously microfilmed or approved for microfilming by... subject to excessive stress and possible damage from special equipment you plan to use, as well as... is in the facility's research room, and such work would disturb researchers. We do not move records...
36 CFR 1254.102 - What requests does NARA not approve?
Code of Federal Regulations, 2012 CFR
2012-07-01
... publication or which relate closely to other documents previously microfilmed or approved for microfilming by... subject to excessive stress and possible damage from special equipment you plan to use, as well as... is in the facility's research room, and such work would disturb researchers. We do not move records...
36 CFR 1254.102 - What requests does NARA not approve?
Code of Federal Regulations, 2014 CFR
2014-07-01
... publication or which relate closely to other documents previously microfilmed or approved for microfilming by... subject to excessive stress and possible damage from special equipment you plan to use, as well as... is in the facility's research room, and such work would disturb researchers. We do not move records...
36 CFR 1254.102 - What requests does NARA not approve?
Code of Federal Regulations, 2010 CFR
2010-07-01
... publication or which relate closely to other documents previously microfilmed or approved for microfilming by... subject to excessive stress and possible damage from special equipment you plan to use, as well as... is in the facility's research room, and such work would disturb researchers. We do not move records...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-22
... perform its intended function without unreasonable adverse effects on human health or the environment... and other knowledge, including its effects on human health and the environment. This document also... range of stakeholders including environmental, human health, farmworker, and agricultural advocates; the...
ESL for Hotel/Hospitality Industry. Level: Advanced Beginner/Intermediate.
ERIC Educational Resources Information Center
Western Suffolk County Board of Cooperative Educational Services, Northport, NY.
This document contains 16 lesson plans for an advanced beginning and intermediate course in work-related English for non-English- or limited-English-speaking entry-level employees in the hotel and hospitality industry. Course objectives are as follows: helping participants understand and use job-specific vocabulary; receive and understand…
ESL for Hotel/Hospitality Industry. Level: Beginner.
ERIC Educational Resources Information Center
Western Suffolk County Board of Cooperative Educational Services, Northport, NY.
This document contains eight lesson plans for a beginning course in work-related English for non-English or limited-English speaking entry-level employees in the hotel and hospitality industry. Course objectives include the following: helping participants understand and use job-specific vocabulary; receive and understand job-related instructions;…
Standard Review Plan for Environmental Restoration Program Quality Management Plans. Revision 2
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-12-01
The Department of Energy, Richland Operations Office (RL) Manual Environmental Restoration Program Quality System Requirements (QSR) for the Hanford Site, defines all quality requirements governing Hanford Environmental Restoration (ER) Program activities. The QSR requires that ER Program participants develop Quality Management Plans (QMPs) that describe how the QSR requirements will be implemented for their assigned scopes of work. This standard review plan (SRP) describes the ER program participant responsibilities for submittal of QMPs to the RL Environmental Restoration Division for review and the RL methodology for performing the reviews of participant QMPS. The SRP serves the following functions: acts asmore » a guide in the development or revision of QMPs to assure that the content is complete and adequate; acts as a checklist to be used by the RL staff in their review of participant QMPs; acts as an index or matrix between the requirements of the QSR and implementing methodologies described in the QMPs; decreases the time and subjectivity of document reviews; and provides a formal, documented method for describing exceptions, modifications, or waivers to established ER Program quality requirements.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Roop, S.S.; Warner, J.E.; Rosa, D.
1998-11-01
Railroads continue to play an important role in the Texas transportation system. This study addresses the potential for implementing a rail planning process in the Texas Department of Transportation. The study is documented in three reports, produced in coordinated and parallel efforts by the Center for Transportation Research and the Texas Transportation Institute. This report documents the work performed by TTI, whereby a rail planning framework is presented which formalizes the planning process and presents the key elements as a series of discrete and logical steps. These steps may be used to guide TxDOT in the formation of goals, identificationmore » of issues and affected parties, selection of appropriate analytical methodologies, location of data sources, and implementation of results. The report also presents an in-depth discussion of several key issues facing transportation agencies. These include rail line abandonment, intermodal service planning, and urban rail rationalization. A discussion of the Texas rail system covers the Class 1 railroads, shortline railroads, Amtrak, and the Mexican rail system.« less
20 CFR 669.510 - What planning documents must an NFJP grantee submit?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false What planning documents must an NFJP grantee submit? 669.510 Section 669.510 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF... Accountability, Planning and Waiver Provision § 669.510 What planning documents must an NFJP grantee submit? Each...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Harwell, Amber Suzanne
2015-07-01
Welcome to our FY16–FY20 Strategic Plan, which both refects our continued dedication to the work we do and reinforces the importance of the integrated Laboratories’ strategic framework to our future. This document is the result of the leadership team’s journey over the past few years in response to the needs of our nation. In an external environment that continues to change, sometimes in unexpected ways, it is critical that our mission areas and our foundation become increasingly synergistic, forming a whole whose parts are interdependent.
NASA Technical Reports Server (NTRS)
Dunn, Michael R.
2014-01-01
Over the course of my internship in the Flight Projects Office of NASA's Launch Services Program (LSP), I worked on two major projects, both of which dealt with updating current systems to make them more accurate and to allow them to operate more efficiently. The first project dealt with the Mission Integration Reporting System (MIRS), a web-accessible database application used to manage and provide mission status reporting for the LSP portfolio of awarded missions. MIRS had not gone through any major updates since its implementation in 2005, and it was my job to formulate a recommendation for the improvement of the system. The second project I worked on dealt with the Mission Plan, a document that contains an overview of the general life cycle that is followed by every LSP mission. My job on this project was to update the information currently in the mission plan and to add certain features in order to increase the accuracy and thoroughness of the document. The outcomes of these projects have implications in the orderly and efficient operation of the Flight Projects Office, and the process of Mission Management in the Launch Services Program as a whole.
Hallett, Nutmeg; Huber, Jörg W; Sixsmith, Judith; Dickens, Geoffrey L
2016-12-01
This paper describes an audit of prevention and management of violence and aggression care plans and incident reporting forms which aimed to: (i) report the compliance rate of completion of care plans; (ii) identify the extent to which patients contribute to and agree with their care plan; (iii) describe de-escalation methods documented in care plans; and (iv) ascertain the extent to which the de-escalation methods described in the care plan are recorded as having been attempted in the event of an incident. Care plans and incident report forms were examined for all patients in men's and women's mental health care pathways who were involved in aggressive incidents between May and October 2012. In total, 539 incidents were examined, involving 147 patients and 121 care plans. There was no care plan in place at the time of 151 incidents giving a compliance rate of 72%. It was documented that 40% of patients had contributed to their care plans. Thematic analysis of de-escalation methods documented in the care plans revealed five de-escalation themes: staff interventions, interactions, space/quiet, activities and patient strategies/skills. A sixth category, coercive strategies, was also documented. Evidence of adherence to de-escalation elements of the care plan was documented in 58% of incidents. The reasons for the low compliance rate and very low documentation of patient involvement need further investigation. The inclusion of coercive strategies within de-escalation documentation suggests that some staff fundamentally misunderstand de-escalation. © 2016 Australian College of Mental Health Nurses Inc.
14 CFR 77.2 - Definition of terms.
Code of Federal Regulations, 2011 CFR
2011-01-01
... approach system is planned and is so indicated by an FAA approved airport layout plan; a military service approved military airport layout plan; any other FAA planning document, or military service military... layout plan, a military service approved military airport layout plan, or by any planning document...
Online Learning Flight Control for Intelligent Flight Control Systems (IFCS)
NASA Technical Reports Server (NTRS)
Niewoehner, Kevin R.; Carter, John (Technical Monitor)
2001-01-01
The research accomplishments for the cooperative agreement 'Online Learning Flight Control for Intelligent Flight Control Systems (IFCS)' include the following: (1) previous IFC program data collection and analysis; (2) IFC program support site (configured IFC systems support network, configured Tornado/VxWorks OS development system, made Configuration and Documentation Management Systems Internet accessible); (3) Airborne Research Test Systems (ARTS) II Hardware (developed hardware requirements specification, developing environmental testing requirements, hardware design, and hardware design development); (4) ARTS II software development laboratory unit (procurement of lab style hardware, configured lab style hardware, and designed interface module equivalent to ARTS II faceplate); (5) program support documentation (developed software development plan, configuration management plan, and software verification and validation plan); (6) LWR algorithm analysis (performed timing and profiling on algorithm); (7) pre-trained neural network analysis; (8) Dynamic Cell Structures (DCS) Neural Network Analysis (performing timing and profiling on algorithm); and (9) conducted technical interchange and quarterly meetings to define IFC research goals.
Engineered Barrier System: Physical and Chemical Environment
DOE Office of Scientific and Technical Information (OSTI.GOV)
P. Dixon
2004-04-26
The conceptual and predictive models documented in this Engineered Barrier System: Physical and Chemical Environment Model report describe the evolution of the physical and chemical conditions within the waste emplacement drifts of the repository. The modeling approaches and model output data will be used in the total system performance assessment (TSPA-LA) to assess the performance of the engineered barrier system and the waste form. These models evaluate the range of potential water compositions within the emplacement drifts, resulting from the interaction of introduced materials and minerals in dust with water seeping into the drifts and with aqueous solutions forming bymore » deliquescence of dust (as influenced by atmospheric conditions), and from thermal-hydrological-chemical (THC) processes in the drift. These models also consider the uncertainty and variability in water chemistry inside the drift and the compositions of introduced materials within the drift. This report develops and documents a set of process- and abstraction-level models that constitute the engineered barrier system: physical and chemical environment model. Where possible, these models use information directly from other process model reports as input, which promotes integration among process models used for total system performance assessment. Specific tasks and activities of modeling the physical and chemical environment are included in the technical work plan ''Technical Work Plan for: In-Drift Geochemistry Modeling'' (BSC 2004 [DIRS 166519]). As described in the technical work plan, the development of this report is coordinated with the development of other engineered barrier system analysis model reports.« less
The 1990 progress report and future plans
NASA Technical Reports Server (NTRS)
Friedland, Peter; Zweben, Monte; Compton, Michael
1990-01-01
This document describes the progress and plans of the Artificial Intelligence Research Branch (RIA) at ARC in 1990. Activities span a range from basic scientific research to engineering development and to fielded NASA applications, particularly those applications that are enabled by basic research carried out at RIA. Work is conducted in-house and through collaborative partners in academia and industry. Our major focus is on a limited number of research themes with a dual commitment to technical excellence and proven applicability to NASA short, medium, and long-term problems. RIA acts as the Agency's lead organization for research aspects of artificial intelligence, working closely with a second research laboratory at JPL and AI applications groups at all NASA centers.
Network Speech Systems Technology Program
NASA Astrophysics Data System (ADS)
Weinstein, C. J.
1980-09-01
This report documents work performed during FY 1980 on the DCA-sponsored Network Speech Systems Technology Program. The areas of work reported are: (1) communication systems studies in Demand-Assignment Multiple Access (DAMA), voice/data integration, and adaptive routing, in support of the evolving Defense Communications System (DCS) and Defense Switched Network (DSN); (2) a satellite/terrestrial integration design study including the functional design of voice and data interfaces to interconnect terrestrial and satellite network subsystems; and (3) voice-conferencing efforts dealing with support of the Secure Voice and Graphics Conferencing (SVGC) Test and Evaluation Program. Progress in definition and planning of experiments for the Experimental Integrated Switched Network (EISN) is detailed separately in an FY 80 Experiment Plan Supplement.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mauro, R.; Leach, S.
This paper summarizes current and planned activities in the areas of hydrogen production and use, near-term venture opportunities, and codes and standards. The rationale for these efforts is to assess industry interest and engage in activities that move hydrogen technologies down the path to commercialization. Some of the work presented in this document is a condensed, preliminary version of reports being prepared under the DOE/NREL contract. In addition, the NHA work funded by Westinghouse Savannah River Corporation (WSRC) to explore the opportunities and industry interest in a Hydrogen Research Center is briefly described. Finally, the planned support of and industrymore » input to the Hydrogen Technical Advisory Panel (HTAP) on hydrogen demonstration projects is discussed.« less
NASA Work Breakdown Structure (WBS) Handbook
NASA Technical Reports Server (NTRS)
Fleming, Jon F.; Poole, Kenneth W.
2016-01-01
The purpose of this document is to provide program/project teams necessary instruction and guidance in the best practices for Work Breakdown Structure (WBS) and WBS dictionary development and use for project implementation and management control. This handbook can be used for all types of NASA projects and work activities including research, development, construction, test and evaluation, and operations. The products of these work efforts may be hardware, software, data, or service elements (alone or in combination). The aim of this document is to assist project teams in the development of effective work breakdown structures that provide a framework of common reference for all project elements. The WBS and WBS dictionary are effective management processes for planning, organizing, and administering NASA programs and projects. The guidance contained in this document is applicable to both in-house, NASA-led effort and contracted effort. It assists management teams from both entities in fulfilling necessary responsibilities for successful accomplishment of project cost, schedule, and technical goals. Benefits resulting from the use of an effective WBS include, but are not limited to: providing a basis for assigned project responsibilities, providing a basis for project schedule and budget development, simplifying a project by dividing the total work scope into manageable units, and providing a common reference for all project communication.
Work Breakdown Structure (WBS) Handbook
NASA Technical Reports Server (NTRS)
2010-01-01
The purpose of this document is to provide program/project teams necessary instruction and guidance in the best practices for Work Breakdown Structure (WBS) and WBS dictionary development and use for project implementation and management control. This handbook can be used for all types of NASA projects and work activities including research, development, construction, test and evaluation, and operations. The products of these work efforts may be hardware, software, data, or service elements (alone or in combination). The aim of this document is to assist project teams in the development of effective work breakdown structures that provide a framework of common reference for all project elements. The WBS and WBS dictionary are effective management processes for planning, organizing, and administering NASA programs and projects. The guidance contained in this document is applicable to both in-house, NASA-led effort and contracted effort. It assists management teams from both entities in fulfilling necessary responsibilities for successful accomplishment of project cost, schedule, and technical goals. Benefits resulting from the use of an effective WBS include, but are not limited to: providing a basis for assigned project responsibilities, providing a basis for project schedule development, simplifying a project by dividing the total work scope into manageable units, and providing a common reference for all project communication.
IN SITU FIELD TESTING OF PROCESSES
DOE Office of Scientific and Technical Information (OSTI.GOV)
J.S.Y. YANG
2004-11-08
The purpose of this scientific analysis report is to update and document the data and subsequent analyses from ambient field-testing activities performed in underground drifts and surface-based boreholes through unsaturated zone (UZ) tuff rock units. In situ testing, monitoring, and associated laboratory studies are conducted to directly assess and evaluate the waste emplacement environment and the natural barriers to radionuclide transport at Yucca Mountain. This scientific analysis report supports and provides data to UZ flow and transport model reports, which in turn contribute to the Total System Performance Assessment (TSPA) of Yucca Mountain, an important document for the license applicationmore » (LA). The objectives of ambient field-testing activities are described in Section 1.1. This report is the third revision (REV 03), which supercedes REV 02. The scientific analysis of data for inputs to model calibration and validation as documented in REV 02 were developed in accordance with the Technical Work Plan (TWP) ''Technical Work Plan for: Performance Assessment Unsaturated Zone'' (BSC 2004 [DIRS 167969]). This revision was developed in accordance with the ''Technical Work Plan for: Unsaturated Zone Flow Analysis and Model Report Integration'' (BSC 2004 [DIRS 169654], Section 1.2.4) for better integrated, consistent, transparent, traceable, and more complete documentation in this scientific analysis report and associated UZ flow and transport model reports. No additional testing or analyses were performed as part of this revision. The list of relevant acceptance criteria is provided by ''Technical Work Plan for: Unsaturated Zone Flow Analysis and Model Report Integration'' (BSC 2004 [DIRS 169654]), Table 3-1. Additional deviations from the TWP regarding the features, events, and processes (FEPs) list are discussed in Section 1.3. Documentation in this report includes descriptions of how, and under what conditions, the tests were conducted. The descriptions and analyses provide data useful for refining and confirming the understanding of flow, drift seepage, and transport processes in the UZ. The UZ testing activities included measurement of permeability distribution, quantification of the seepage of water into the drifts, evaluation of fracture-matrix interaction, study of flow along faults, testing of flow and transport between drifts, characterization of hydrologic heterogeneity along drifts, estimation of drying effects on the rock surrounding the drifts due to ventilation, monitoring of moisture conditions in open and sealed drifts, and determination of the degree of minimum construction water migration below drift. These field tests were conducted in two underground drifts at Yucca Mountain, the Exploratory Studies Facility (ESF) drift, and the cross-drift for Enhanced Characterization of the Repository Block (ECRB), as described in Section 1.2. Samples collected in boreholes and underground drifts have been used for additional hydrochemical and isotopic analyses for additional understanding of the UZ setting. The UZ transport tests conducted at the nearby Busted Butte site (see Figure 1-4) are also described in this scientific analysis report.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-08-01
The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S and M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S and M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, andmore » the technical approach for the project. A companion document, the EFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of EFDP Facilities was initiated in FY 1994 and will be completed in FY 2000. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $51M. The costs are summarized. Upon completion of deactivation, annual S and M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year.« less
Ugalde, Anna; O'Callaghan, Clare; Byard, Clem; Brean, Samantha; MacKay, Jenelle; Boltong, Anna; Davoren, Sondra; Lawson, Deborah; Parente, Phillip; Michael, Natasha; Livingston, Patricia
2018-05-11
While advance care planning holds promise, uptake is variable and it is unclear how well people engage with or comprehend advance care planning. The objective of this study was to explore how people with cancer comprehended advance care plans and examine how accurately advance care planning documentation represented patient wishes. This study used a qualitative descriptive design. Data collection comprised interviews and an examination of participants' existing advance care planning documentation. Participants included those who had any diagnosis of cancer with an advance care plan recorded: Refusal of Treatment Certificate, Statement of Choices, and/or Enduring Power of Attorney (Medical Treatment) at one cancer treatment centre. Fourteen participants were involved in the study. Twelve participants were female (86%). The mean age was 77 (range: 61-91), and participants had completed their advance care planning documentation between 8 and 72 weeks prior to the interview (mean 33 weeks). Three themes were evident from the data: incomplete advance care planning understanding and confidence, limited congruence for attitude and documentation, advance care planning can enable peace of mind. Complete advance care planning understanding was unusual; most participants demonstrated partial comprehension of their own advance care plan, and some indicated very limited understanding. Participants' attitudes and their written document congruence were limited, but advance care planning was seen as helpful. This study highlighted advance care planning was not a completely accurate representation of patient wishes. There is opportunity to improve how patients comprehend their own advance care planning documentation.
Space Station Freedom (SSF) Data Management System (DMS) performance model data base
NASA Technical Reports Server (NTRS)
Stovall, John R.
1993-01-01
The purpose of this document was originally to be a working document summarizing Space Station Freedom (SSF) Data Management System (DMS) hardware and software design, configuration, performance and estimated loading data from a myriad of source documents such that the parameters provided could be used to build a dynamic performance model of the DMS. The document is published at this time as a close-out of the DMS performance modeling effort resulting from the Clinton Administration mandated Space Station Redesign. The DMS as documented in this report is no longer a part of the redesigned Space Station. The performance modeling effort was a joint undertaking between the National Aeronautics and Space Administration (NASA) Johnson Space Center (JSC) Flight Data Systems Division (FDSD) and the NASA Ames Research Center (ARC) Spacecraft Data Systems Research Branch. The scope of this document is limited to the DMS core network through the Man Tended Configuration (MTC) as it existed prior to the 1993 Clinton Administration mandated Space Station Redesign. Data is provided for the Standard Data Processors (SDP's), Multiplexer/Demultiplexers (MDM's) and Mass Storage Units (MSU's). Planned future releases would have added the additional hardware and software descriptions needed to describe the complete DMS. Performance and loading data through the Permanent Manned Configuration (PMC) was to have been included as it became available. No future releases of this document are presently planned pending completion of the present Space Station Redesign activities and task reassessment.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false What planning documents and information are... PROGRAM UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT The MSFW Youth Program § 669.660 What planning...? The required planning documents and other required information and the submission dates for filing are...
ERIC Educational Resources Information Center
White, Robert L.
Generated as the result of the deliberations of the COM Catalog Advisory Work Group, which depended heavily on a review of the available literature, individual analysis, and group discussion, this report is intended as a general planning document for Virginia Commonwealth university libraries concerning their possible implementation of a COM…
36 CFR § 1254.102 - What requests does NARA not approve?
Code of Federal Regulations, 2013 CFR
2013-07-01
... publication or which relate closely to other documents previously microfilmed or approved for microfilming by... subject to excessive stress and possible damage from special equipment you plan to use, as well as... is in the facility's research room, and such work would disturb researchers. We do not move records...
ERIC Educational Resources Information Center
Faulkner, Susan L.; And Others
This document contains 30 papers on professional development in community colleges. The following papers are included: "Effective Leadership Strategies for Planning and Implementing Tech Prep" (Bragg, Huffman); "Small Business Management-Tech Prep" (Harvey); "Educational Reform and the New Mission" (Hoerner);…
Working with Transgender Children and Their Classmates in Pre-Adolescence: Just Be Supportive
ERIC Educational Resources Information Center
Luecke, Julie C.
2011-01-01
This study documents a school district's coordinated response to an elementary student's social transition from a gender variant boy to a female gender expression. Data were gathered through analysis of journal entries, lesson plans, and interviews with the child, guardian, and district personnel. Stakeholders reported a favorable outlook on the…
ERIC Educational Resources Information Center
Davlatov, Ismail D.; Mulloev, Sharif M.
This book provides an indepth description and analysis of financial management and budgetary procedures for education in Tajikistan. This country's case is exceptional even for the group of newly independent post-Soviet countries. In addition to the difficulties of the transition period similar for all former centrally planned economies…
ERIC Educational Resources Information Center
Bouapao, Lytou; Sengchandavong, Ouam; Sihavong, Siphandone
This study provides an indepth description of financial management and budgetary procedures for education as well as a detailed analysis of major problems, recent developments, and new issues in Cambodia, Laos, and Vietnam. Laos, formerly one of the centrally planned economies, was previously considered "dormant" because of its limited…
ERIC Educational Resources Information Center
Hart Barnett, Juliet E.; Crippen, Robert
2014-01-01
Despite the transition requirements mandated by IDEA, and a growing body of research supporting effective transition planning for learners with autism spectrum disorders and intellectual disability, current national surveys of transition from school to work document dismal employment outcomes for adults with significant disabilities who frequently…
Exploring Work: Fun Activities for Girls.
ERIC Educational Resources Information Center
Education Development Center, Inc., Newton, MA. Women's Educational Equity Act Dissemination Center.
This document contains learning activities to help middle school girls begin the career planning process and resist gender-role stereotyping. The activities are designed for individuals and/or groups of girls either in classroom settings or in organizations such as Girl Scouts and 4-H Clubs. A total of 30 activities are organized into 4 sections…
Construction Cluster Volume 5 [Electrical].
ERIC Educational Resources Information Center
Pennsylvania State Dept. of Justice, Harrisburg. Bureau of Correction.
The document is the fifth of a series, to be integrated with a G.E.D. program, containing instructional materials for the construction cluster. The volume focuses on electrical work and consists of 20 instructional units which require a month of study: (1) safety precautions and first aid for electrical workers; (2) planning a simple installation;…
Occupational Exploration at Ontario Junior High School: 9th Grade.
ERIC Educational Resources Information Center
Bates, Gene; And Others
The document contains 56 activities for Grade 9. The contents include the following areas: questions about the future; job seeking activities and guidelines; career games; a personal interest check list; unit guides for courses in World of Work (55 pages), and Career Educational Planning (40 pages) which include objectives, activities, evaluation,…
Engaging Educators: Common Core State Standards Implementation
ERIC Educational Resources Information Center
Achieve, Inc., 2011
2011-01-01
To date, 44 states and the District of Columbia have adopted the Common Core State Standards (CCSS). Achieve has prepared this planning document to help all states in the American Diploma Project Network (ADP) and the Partnership for Assessment of Readiness for College and Careers (PARCC) consortium engage educators in the essential work of…
42 CFR 23.34 - What other conditions are imposed?
Code of Federal Regulations, 2010 CFR
2010-10-01
..., under section 1842(b)(3)(B)(ii) of the Social Security Act as full payment for all services for which... administers the State plan for medical assistance under title XIX of the Social Security Act to provide... during normal working hours to accounts, documents, and records for the purposes of audit or evaluation...
42 CFR 23.34 - What other conditions are imposed?
Code of Federal Regulations, 2011 CFR
2011-10-01
..., under section 1842(b)(3)(B)(ii) of the Social Security Act as full payment for all services for which... administers the State plan for medical assistance under title XIX of the Social Security Act to provide... during normal working hours to accounts, documents, and records for the purposes of audit or evaluation...
Nicoll, A
2010-12-01
To be effective risk prevention work takes place well before pandemics through the three Ps: Planning, Preparedness and Practise. Between 2005 and 2008 the European Centre for Disease Prevention and Control (ECDC) worked with the European Commission (EC) and the WHO Regional Office for Europe (WHO-Euro) to assist European countries in preparing themselves for a future influenza pandemic. All eligible countries in the European Union and European Economic Area participated with energy and commitment. Indicators of preparedness were developed based on WHO planning guidance and these were set within a simple assessment which included a formal country visit. The procedure evolved considerably with field experience. As the complexity of pandemic preparedness was appreciated it changed from being a classical short external assessment to longer national self-assessments with demonstrable impact, especially when self-assessments were published. There were essential supporting activities undertaken including a series of pan-European pandemic preparedness workshops organised by EC, WHO-Euro, ECDC and countries holding the European Union Presidency. The self-assessments highlighted additional work and documentation that was needed by national authorities from the ECDC. This work was undertaken and the document produced. The benefits of the self-assessments were seen in the 2009 pandemic in that EU/EEA countries performed better than some others. A number of the guidance documents were updated to fit the specific features of the pandemic. However the pandemic revealed many weaknesses and brought new challenges for European countries, notably over communication and vaccines, the need to prepare for a variety of scenarios and to factor severity estimates into preparedness, to improve surveillance for severe disease and to deliver seroepidemiology. Any revised self-assessment procedure will need to respond to these challenges.
A national evaluation of community-based mental health strategies in Finland.
Vähäniemi, Anu; Warwick-Smith, Katja; Hätönen, Heli; Välimäki, Maritta
2018-02-01
High-quality mental health care requires written strategies to set a vision for the future, yet, there is limited systematic information available on the monitoring and evaluation of such strategies. The aim of this nationwide study is to evaluate local mental health strategies in community-based mental health services provided by municipalities. Mental health strategy documents were gathered through an online search and an e-mail survey of the local authorities of all Finnish mainland municipalities (n = 320). Out of 320 municipalities, documents for 129 municipalities (63 documents) were included in the study. The documents obtained (n = 63) were evaluated against the World Health Organization checklist for mental health strategies and policies. Evaluation of the process, operations and content of the documents, against 31 indicators in the checklist. Out of 320 Finnish municipalities, 40% (n = 129) had a mental health strategy document available and 33% (n = 104) had a document that was either in preparation or being updated. In these documents, priorities, targets and activities were clearly described. Nearly all (99%) of the documents suggested a commitment to preventative work, and 89% mentioned a dedication to developing community-based care. The key shortfalls identified were the lack of consideration of human rights (0%), the limited consideration of research (5%) and the lack of financial planning (28%) to successfully execute the plans. Of the documents obtained, 60% covered both mental health and substance abuse issues. This study contributes to the limited evidence base on health care strategy evaluations. Further research is needed to understand the potential impact of policy analysis. © The Author(s) 2017. Published by Oxford University Press in association with the International Society for Quality in Health Care. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com
Phased Project Planning Guidelines
NASA Technical Reports Server (NTRS)
1968-01-01
NHB 7121.2 is the initial publication of the guidelines for implementation of the Phased Project Planning (PPP) concept prescribed by NPD 7121,1A. These guidelines are applicable to the planning and approval activities which lead to the implementation of major new research and development projects as defined in NPD 7121.1A as well as to major modifications or extensions of approved projects. They should, therefore, be reflected in the Project Approval Documents which serve as the basic documentation for project definition, guidance and control throughout NASA. The purpose of PPP is to provide, through defined phases, an adequate basis for management decisions on the extent to which project activities can be properly undertaken and commitments made. However, these guidelines do not prescribe detailed format and content of plans and other documents and reports used to apply the PPP concept. Similarly, the work content of phases and the information requirements described herein are not checklists. They are included to assist in understanding the intent of the PPP concept and should not be viewed as rigid or inflexible. PPP, as a concept for orderly planning and definition of new major R&D undertakings, must be adapted to the peculiarities of each individual case. However, the flexibility permitted for adaptation should not be considered as a license for major variation which would compromise the objectives that underlie the concept. Cognizant NASA officials are expected to pursue their project planning and definition activities in reasonable conformance with these guidelines and to request only those exceptions or deviations which are clearly necessary and justified. These guidelines will be modified as determined necessary on the basis of experience. Comments or suggestions for changes should be directed to the Office of Organization and Management.
Building successful coalitions for promoting advance care planning.
Marchand, Lucille; Fowler, Kathryn J; Kokanovic, Obrad
2006-01-01
Advance care planning (ACP) has had few successful initiatives. This qualitative study explores the challenges and successes of an advance care planning coalition in Wisconsin called Life Planning 2000 using key informant interviews (n = 24) and grounded theory. Major themes included: commitment (the need for leadership, recruitment of key members, and funding); cohesiveness (disparate groups collaborating toward a common purpose), and outcomes (shift in paradigm from signing documents to process of advanced care planning, new-found collaborative relationships, and educational tool development). Coalitions need to define short-, intermediate-, and long-term goals that result in measurable outcomes and an evaluation process. Resources must be commensurate with goals. Strong leadership, paid staff adequate funding, and the collaboration of diverse groups working toward common goals are the basic requirements of a successful coalition.
20 CFR 668.720 - What information must these planning documents contain?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false What information must these planning... 166 Planning/Funding Process § 668.720 What information must these planning documents contain? (a) The... planning instructions issued by the Department, the comprehensive services plan must describe in narrative...
NASA Astrophysics Data System (ADS)
Georgopoulos, A.; Lambrou, E.; Pantazis, G.; Agrafiotis, P.; Papadaki, A.; Kotoula, L.; Lampropoulos, K.; Delegou, E.; Apostolopoulou, M.; Alexakis, M.; Moropoulou, A.
2017-05-01
The National Technical University of Athens undertook the compilation of an "Integrated Diagnostic Research Project and Strategic Planning for Materials, Interventions Conservation and Rehabilitation of the Holy Aedicule of the Church of the Holy Sepulchre in Jerusalem". This paper focuses on the work merging the geometric documentation with the characterization of materials, the identification of building phases and the diagnosis of decay and pathology through the use of analytical and non-destructive techniques. Through this integrated approach, i.e. through the documentation and characterization of the building materials, through the diagnosis of decay and pathology, through the accurate geometric documentation of the building and through the non-destructive prospection of its internal structure, it was feasible to identify the construction phases of the Holy Aedicule, identifying the remnants of the preserved earlier constructions and the original monolithic Tomb. This work, thus, demonstrates that the adoption of an interdisciplinary approach for integrated documentation is a powerful tool for a better understanding of monuments, both in terms of its structural integrity, as well as in terms of its state of preservation, both prerequisites for effective rehabilitation.
Leveraging standards to support patient-centric interdisciplinary plans of care.
Dykes, Patricia C; DaDamio, Rebecca R; Goldsmith, Denise; Kim, Hyeon-eui; Ohashi, Kumiko; Saba, Virginia K
2011-01-01
As health care systems and providers move towards meaningful use of electronic health records, the once distant vision of collaborative patient-centric, interdisciplinary plans of care, generated and updated across organizations and levels of care, may soon become a reality. Effective care planning is included in the proposed Stages 2-3 Meaningful Use quality measures. To facilitate interoperability, standardization of plan of care messaging, content, information and terminology models are needed. This degree of standardization requires local and national coordination. The purpose of this paper is to review some existing standards that may be leveraged to support development of interdisciplinary patient-centric plans of care. Standards are then applied to a use case to demonstrate one method for achieving patient-centric and interoperable interdisciplinary plan of care documentation. Our pilot work suggests that existing standards provide a foundation for adoption and implementation of patient-centric plans of care that are consistent with federal requirements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... letters and documents relating to pension and other plans. 301.6104(a)-3 Section 301.6104(a)-3 Internal... of Internal Revenue Service letters and documents relating to pension and other plans. (a) In general... qualification of a pension, profit-sharing or stock bonus plan under section 401(a), an annuity plan under...
NASA Supportability Engineering Implementation Utilizing DoD Practices and Processes
NASA Technical Reports Server (NTRS)
Smith, David A.; Smith, John V.
2010-01-01
The Ares I design and development program made the determination early in the System Design Review Phase to utilize DoD ILS and LSA approach for supportability engineering as an integral part of the system engineering process. This paper is to provide a review of the overall approach to design Ares-I with an emphasis on a more affordable, supportable, and sustainable launch vehicle. Discussions will include the requirements development, design influence, support concept alternatives, ILS and LSA planning, Logistics support analyses/trades performed, LSA tailoring for NASA Ares Program, support system infrastructure identification, ILS Design Review documentation, Working Group coordination, and overall ILS implementation. At the outset, the Ares I Project initiated the development of the Integrated Logistics Support Plan (ILSP) and a Logistics Support Analysis process to provide a path forward for the management of the Ares-I ILS program and supportability analysis activities. The ILSP provide the initial planning and coordination between the Ares-I Project Elements and Ground Operation Project. The LSA process provided a system engineering approach in the development of the Ares-I supportability requirements; influence the design for supportability and development of alternative support concepts that satisfies the program operability requirements. The LSA planning and analysis results are documented in the Logistics Support Analysis Report. This document was required during the Ares-I System Design Review (SDR) and Preliminary Design Review (PDR) review cycles. To help coordinate the LSA process across the Ares-I project and between programs, the LSA Report is updated and released quarterly. A System Requirement Analysis was performed to determine the supportability requirements and technical performance measurements (TPMs). Two working groups were established to provide support in the management and implement the Ares-I ILS program, the Integrated Logistics Support Working Group (ILSWG) and the Logistics Support Analysis Record Working Group (LSARWG). The Ares I ILSWG is established to assess the requirements and conduct, evaluate analyses and trade studies associated with acquisition logistic and supportability processes and to resolve Ares I integrated logistics and supportability issues. It established a strategic collaborative alliance for coordination of Logistics Support Analysis activates in support of the integrated Ares I vehicle design and development of logistics support infrastructure. A Joint Ares I - Orion LSAR Working Group was established to: 1) Guide the development of Ares-I and Orion LSAR data and serve as a model for future Constellation programs, 2) Develop rules and assumptions that will apply across the Constellation program with regards to the program's LSAR development, and 3) Maintain the Constellation LSAR Style Guide.
Educational Planning for Establishing a Health-Promoting Workplace (HPW).
Russell, Sally S
2015-01-01
The Academy of Medical-Surgical Nurses (AMSN) has had an ongoing series of articles related to Healthy Practice Environments. The AMSN website (www.amsn.org) also has a number of articles and documents about initiatives that AMSN has undertaken to promote healthy practice environments in health care settings. This articles will focus on the educational work necessary for nurses who desire to increase the healthiness of their workplace. The work is not easy, but the end result could be one that leaves a lasting legacy for those who work in that environment.
Implementation of green infrastructure concept in Citarum Watershed
NASA Astrophysics Data System (ADS)
Maryati, Sri; Humaira, An Nisaa'Siti
2017-03-01
Green infrastructure has several benefits compared to grey infrastructure in term of environmental services and sustainability, such as reducing energy consumption, improving air quality, providing carbon sequestration, and increasing property values. Nevertheless in practice, the implementation of the concept in Indonesia is still limited. Implementation of the certain concept has to be guided in planning document. In this paper, green infrastructure concept in the current spatial plan and other planning documents is assessed. The purpose of this research is to figure out how far the green infrastructure concept is integrated into planning system, based on the analysis of planning documents in Citarum Watershed and expert interviews with local stakeholders. Content analysis method is used to analyze the documents and result of interview. The result shows that green infrastructure concept has not been accommodated in spatial plan or other planning documents widely. There are some challenges in implementing the concept including reward and punishment system (incentive and disincentive), coordination, and lack of human resources.
78 FR 40745 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-08
.... Description: The Advance Planning Document (APD) process, established in the rules at 45 CFR part 95, subpart F, is the procedure by which States request and obtain approval for Federal financial participation... Advance Planning Document 34 1.2 120 4,896 Operational Advance Planning Document 20 1 30 600 Estimated...
Planning, Conducting, and Documenting Data Analysis for Program Improvement
ERIC Educational Resources Information Center
Winer, Abby; Taylor, Cornelia; Derrington, Taletha; Lucas, Anne
2015-01-01
This 2015 document was developed to help technical assistance (TA) providers and state staff define and limit the scope of data analysis for program improvement efforts, including the State Systemic Improvement Plan (SSIP); develop a plan for data analysis; document alternative hypotheses and additional analyses as they are generated; and…
NASA Space Safety Standards and Procedures for Human Rating Requirements
NASA Technical Reports Server (NTRS)
Shivers, C. Herbert
2009-01-01
The National Aeronautics and Space Administration of the United States of America (NASA) has arguably led this planet in space exploration and certainly has been one of two major leaders in those endeavors. NASA governance is institutionalized and managed in a series documents arranged in a hierarchy and flowing down to the work levels. A document tree of NASA s documentation in its totality would likely overwhelm and not be very informative. Taken in segments related to the various business topics and focusing in those segments, however, provides a logical and understandable relationship and flow of requirements and processes. That is the nature of this chapter, a selection of NASA documentation pertaining to space exploration and a description of how those documents together form the plan by which NASA business for space exploration is conducted. Information presented herein is taken from NASA publications and is available publicly and no information herein is protected by copyright or security regulations. While NASA documents are the source of information presented herein, any and all views expressed herein and any misrepresentations of NASA data that may occur herein are those of the author and should not be considered NASA official positions or statements, nor should NASA endorsement of anything presented in this work be assumed.
FAA Vertical Flight Bibliography, 1962 - 1994
1994-08-01
high altitude conditions. A UH-1H aircraft will be used. This project is similar to the work documented in FAA/CT-TN87/40 "Heliport Approach and... work . TITLE: TEST PLAN FOR HELICOPTER VISUAL SEGMENT APPROACH LIGHTING SYSTEM (HALS) REPORT #: FAA/CT-TN88/19 NTIS: N/ A DATE: November 1988 AUTHORS...Hiering, Robert H. Ahlers) (NTIS: N/ A ) RD-64-4 State-of-the-Art Survey for Minimum Approach , Landing and Takeoff Intervals as Dictated by Wakes
Defense switched network technology and experiments program
NASA Astrophysics Data System (ADS)
Weinstein, C. J.
1983-09-01
This report documents work performed during FY 1983 on the DCA-sponsored Defense Switched Network Technology and Experiments Program. The areas of work reported are: (1) development of routing algorithms for application in the Defense Switched Network (DSN); (2) instrumentation and integration of the Experimental Integrated Switched Network (EISN) test facility; (3) development and test of data communication techniques using DoD-standard data protocols in an integrated voice/data network; and (4) EISN system coordination and experiment planning.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weisbin, C.R.; Hamel, W.R.; Barhen, J.
1986-02-01
The Oak Ridge National Laboratory has established the Center for Engineering Systems Advanced Research (CESAR) for the purpose of addressing fundamental problems of intelligent machine technologies. The purpose of this document is to establish a framework and guidelines for research and development within ORNL's CESAR program in areas pertaining to intelligent machines. The specific objective is to present a CESAR Research and Development Plan for such work with a planning horizon of five to ten years, i.e., FY 1985 to FY 1990 and beyond. As much as possible, the plan is based on anticipated DOE needs in the area ofmore » productivity increase and safety to the end of this century.« less
Surface-water quality-assurance plan for the U.S. Geological Survey Washington Water Science Center
Mastin, Mark C.
2016-02-19
This Surface-Water Quality-Assurance Plan documents the standards, policies, and procedures used by the U.S. Geological Survey Washington Water Science Center (WAWSC) for activities related to the collection, processing, storage, analysis, and publication of surface-water data. This plan serves as a guide to all WAWSC personnel involved in surface-water data activities, and changes as the needs and requirements of the WAWSC change. Regular updates to this plan represent an integral part of the quality-assurance process. In the WAWSC, direct oversight and responsibility by the hydrographer(s) assigned to a surface-water station, combined with team approaches in all work efforts, assure highquality data, analyses, reviews, and reports for cooperating agencies and the public.
Planning for Adaptation to Climate Change in the City of Chicago
NASA Astrophysics Data System (ADS)
Wuebbles, D. J.; Hayhoe, K.; Coffee, J.; McGraw, J.; Parzen, J.
2008-12-01
Under Mayor Richard M. Daley's leadership, the City of Chicago initiated the Chicago Climate Action Plan (CCAP) to better understand local implications of global climate change in both higher and lower emissions scenarios, reduce greenhouse gas emissions, and implement programs to build future climate change resilience. The City approached this work not only as a way to make Chicago more adaptable in the future, but also to improve Chicago's quality of life today. The Chicago Climate Action Plan adopted stresses the importance of both reducing greenhouse gas emissions in Chicago and preparing for climate changes that may be unavoidable. Building off of the City's significant environmental programs and projects, and based on our analyses of the climate effects and impacts that improved the scientific understanding of future climate change impacts on Chicago, the City then developed a set of climate change adaptation strategies, resulting in the City of Chicago Climate Change Adaptation Summary. This document includes prioritization of climate change adaptations based on relative risk as well as framework strategies for those tactics categorized as "must do/early action." In early 2008, The Mayor's Office asked five Commissioners from its Green Steering Committee to chair adaptation work groups including: extreme heat; extreme precipitation; buildings, infrastructure and equipment; ecosystems; and leadership, planning and communications. Working with staff from relevant departments, sister agencies and other stakeholders, these work groups developed 39 basic adaptation work plans, including plans for enhancing the City's existing projects and programs that relate to climate change adaptation. Climate change adaptation work will be on-going in City Departments under the Mayor's Office leadership. The City intends to continually monitor and improve its response to climate change, resulting in an improved quality of life for Chicago residents.
Experiences with Extra-Vehicular Activities in Response to Critical ISS Contingencies
NASA Technical Reports Server (NTRS)
Van Cise, Edward A.; Kelly, Brian J.; Radigan, Jeffery P.; Cranmer, Curtis W.
2016-01-01
Initial "Big 14" work was put to the test for the first time in 2010. Deficiencies were found in some of the planning and approaches to that work; Failure Response Assessment Team created in 2010 to address deficiencies -Identify and perform engineering analysis in operations products prior to failure; incorporate results into operations products -Identify actions for protecting ISS against a Next Worse Failure after the first failure occurs -Better document not only EVA products but also planning products, assumptions, and open actions; Pre-failure investments against critical failures best postures ISS for swift response and recovery -A type of insurance policy -Has proven effective in a number of contingency EVA cases since 2010. Planning for MBSU R&R in 2012, Second PM R&R in 2013, EXT MDM R&R in 2014; Current FRAT schedule projects completion of all analysis in 2018
Stein, Gary L; Cagle, John G; Christ, Grace H
2017-03-01
Few data are available describing the involvement and activities of social workers in advance care planning (ACP). We sought to provide data about (1) social worker involvement and leadership in ACP conversations with patients and families; and (2) the extent of functions and activities when these discussions occur. We conducted a large web-based survey of social workers employed in hospice, palliative care, and related settings to explore their role, participation, and self-rated competency in facilitating ACP discussions. Respondents were recruited through the Social Work Hospice and Palliative Care Network and the National Hospice and Palliative Care Organization. Descriptive analyses were conducted on the full sample of respondents (N = 641) and a subsample of clinical social workers (N = 456). Responses were analyzed to explore differences in ACP involvement by practice setting. Most clinical social workers (96%) reported that social workers in their department are conducting ACP discussions with patients/families. Majorities also participate in, and lead, ACP discussions (69% and 60%, respectively). Most respondents report that social workers are responsible for educating patients/families about ACP options (80%) and are the team members responsible for documenting ACP (68%). Compared with other settings, oncology and inpatient palliative care social workers were less likely to be responsible for ensuring that patients/families are informed of ACP options and documenting ACP preferences. Social workers are prominently involved in facilitating, leading, and documenting ACP discussions. Policy-makers, administrators, and providers should incorporate the vital contributions of social work professionals in policies and programs supporting ACP.
40 CFR 93.118 - Criteria and procedures: Motor vehicle emissions budget.
Code of Federal Regulations, 2012 CFR
2012-07-01
... PLANS Conformity to State or Federal Implementation Plans of Transportation Plans, Programs, and..., consultation among federal, State, and local agencies occurred; full implementation plan documentation was... response to comments that are required to be submitted with any implementation plan. EPA will document its...
40 CFR 93.118 - Criteria and procedures: Motor vehicle emissions budget.
Code of Federal Regulations, 2014 CFR
2014-07-01
... PLANS Conformity to State or Federal Implementation Plans of Transportation Plans, Programs, and..., consultation among federal, State, and local agencies occurred; full implementation plan documentation was... response to comments that are required to be submitted with any implementation plan. EPA will document its...
Installation of Groundwater Monitoring Wells TAV-MW15 and TAV-MW16.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lum, Clinton C. L.
This report documents the installation of two groundwater monitoring wells at the Technical Area V Groundwater (TAVG) Area of Concern at Sandia National Laboratories, New Mexico (SNL/NM). SNL/NM is managed and operated by National Technology and Engineering Solutions of Sandia, LLC., a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA- 0003525. Well installation activities were conducted in accordance with the New Mexico Environment Department (NMED) Hazardous Waste Bureau (HWB)-approved work plan Revised Treatability Study Work Plan for In-Situ Bioremediation at the Technical Area-V Groundwater Area of Concern (Workmore » Plan) (SNL/NM March 2016). The Work Plan was approved by NMED HWB prior to the start of field work (NMED May 2016). Project activities were performed from November 2016 through January 2017 by SNL/NM Environmental Restoration (ER) Operations personnel, and the SNL/NM drilling contractor Cascade Drilling LP. Drilling activities began with borehole drilling and sampling on November 30, 2016. Well construction and development fieldwork was completed on January 31, 2017. Land surveys to establish the location coordinates and elevations of the two wells were completed on March 23, 2017, and transmitted to SNL/NM personnel on April 17, 2017.« less
Template for updating regulations in QA manuals
DOE Office of Scientific and Technical Information (OSTI.GOV)
White, M.G.; Banerjee, B.
1992-01-01
Recently, the U.S. Department of Energy (DOE) issued new quality assurance (QA) orders to reflect current policies for conduct and operation of DOE-authorized programs and facilities. Establishing traceability to new QA criteria and requirements from former multidraft orders, QA manuals, and guidance documentation for DOE-funded work can be confusing. Identified critical considerations still must be addressed. Most of the newly stated QA criteria can be cross referenced, where applicable, to former QA plans and manuals. Where additional criteria occur, new procedures may be required, together with revisions in QA plans and manuals.
A practical guide on DTA model applications for regional planning
DOT National Transportation Integrated Search
2016-06-07
This document is intended as a guide for use by Metropolitan Planning Organizations (MPO) and other planning agencies that are interested in applying Dynamic Traffic Assignment (DTA) models for planning applications. The objective of this document is...
78 FR 37819 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-24
.... Description: The Advance Planning Document (APD) process, established in the rules at 45 CFR Part 95, Subpart F, is the procedure by which States request and obtain approval for Federal financial participation... Advance Planning Document 34 1.2 120 4,896 Operational Advance Planning Document 20 1 30 600 [[Page 37820...
30 CFR 254.4 - May I reference other documents in my response plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 2 2010-07-01 2010-07-01 false May I reference other documents in my response plan? 254.4 Section 254.4 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR... May I reference other documents in my response plan? You may reference information contained in other...
NOAA Office of Exploration and Research > About OER > Strategic Plan
Organization Guiding Documents Organizational Structure Map of Staff and Affiliate Locations Strategic Plan Media News Room OER Symposium Overview Organization Guiding Documents Organizational Structure Map of Strategic Plan Home About OER Overview Organization Guiding Documents Organizational Structure Map of Staff
45 CFR 1355.54 - Submittal of advance planning documents.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 45 Public Welfare 4 2010-10-01 2010-10-01 false Submittal of advance planning documents. 1355.54 Section 1355.54 Public Welfare Regulations Relating to Public Welfare (Continued) OFFICE OF HUMAN... § 1355.54 Submittal of advance planning documents. The State title IV-E agency must submit an APD for a...
Quality-assurance plan for water-resources activities of the U.S. Geological Survey in Idaho
Packard, F.A.
1996-01-01
To ensure continued confidence in its products, the Water Resources Division of the U.S. Geological Survey implemented a policy that all its scientific work be performed in accordance with a centrally managed quality-assurance program. This report establishes and documents a formal policy for current (1995) quality assurance within the Idaho District of the U.S. Geological Survey. Quality assurance is formalized by describing district organization and operational responsibilities, documenting the district quality-assurance policies, and describing district functions. The districts conducts its work through offices in Boise, Idaho Falls, Twin Falls, Sandpoint, and at the Idaho National Engineering Laboratory. Data-collection programs and interpretive studies are conducted by two operating units, and operational and technical assistance is provided by three support units: (1) Administrative Services advisors provide guidance on various personnel issues and budget functions, (2) computer and reports advisors provide guidance in their fields, and (3) discipline specialists provide technical advice and assistance to the district and to chiefs of various projects. The district's quality-assurance plan is based on an overall policy that provides a framework for defining the precision and accuracy of collected data. The plan is supported by a series of quality-assurance policy statements that describe responsibilities for specific operations in the district's program. The operations are program planning; project planning; project implementation; review and remediation; data collection; equipment calibration and maintenance; data processing and storage; data analysis, synthesis, and interpretation; report preparation and processing; and training. Activities of the district are systematically conducted under a hierarchy of supervision an management that is designed to ensure conformance with Water Resources Division goals quality assurance. The district quality-assurance plan does not describe detailed technical activities that are commonly termed "quality-control procedures." Instead, it focuses on current policies, operations, and responsibilities that are implemented at the management level. Contents of the plan will be reviewed annually and updated as programs and operations change.
Using Computers in Relation to Learning Climate in CLIL Method
ERIC Educational Resources Information Center
Binterová, Helena; Komínková, Olga
2013-01-01
The main purpose of the work is to present a successful implementation of CLIL method in Mathematics lessons in elementary schools. Nowadays at all types of schools (elementary schools, high schools and universities) all over the world every school subject tends to be taught in a foreign language. In 2003, a document called Action plan for…
Design Development Plans for Altamont Junior High School, Klamath Falls, Oregon.
ERIC Educational Resources Information Center
Lutes and Amundson, Architects and Community Planners, Springfield, OR.
The architects, with the teaching staff, administration, students, and community, worked as a team to make a coordinated statement of the physical, functional, and esthetic proposals for a new school. The space and functional requirements of each teaching area have been documented and analyzed to arrive at a realistic appraisal of need for the…
ACHP | Working Together to Build a More Inclusive Preservation Program
field? As a grade school student, I loved history and writing, but never had an exact idea of what I combination of history, the built environment, writing, research, and the challenge of conveying why the past : architectural history, preservation theory, planning history, documentation (photography and measured drawings
ERIC Educational Resources Information Center
Haworth-Roberts, A., Ed.
School building maintenance must find an appropriate balance between planned and reactive work in order to conserve costs. This document provides ways in which authorities can assess their maintenance requirements and make better use of the resources available. It considers how to deal with problems which have their roots in historical design…
Planning Together: Positive Classroom Environments. Diversity in the Classroom Series, Number Four.
ERIC Educational Resources Information Center
Hindle, Doug
This document, the fourth in a series on diversity in the classroom, supports the belief that challenges faced by teachers working with diverse students can only be met through teacher practices that increase levels of positive teacher-student interaction and that create, in each student, effective social and problem solving skills. Section 1,…
From confrontation to conservation: the Banff National Park experience
Douglas W. Hodgins; Jeffrey E. Green; Gail Harrison; Jillian Roulet
2000-01-01
Banff National Park, the flagship of the Canadian national park system, has become the focus of debate over park use versus protected area conservation. In response to the debate, the Minister of Canadian Heritage commissioned an independent review. The resulting Banff-Bow Valley Study report and Banff National Park Management Plan are landmark documents. The work was...
ERIC Educational Resources Information Center
Ahmed, Hassan; Bradford, Simon
2011-01-01
The purpose of this article is to critically examine Somaliland's post-conflict education reconstruction. The work includes documentary analysis of the Somaliland Education Policy. The authors also draw on the National Teacher Education Policy and the Somaliland National Education Development Plan. The analysis of these documents is primarily…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-16
... documented as past performance for future acquisitions.'' Response: Partially concur. The Councils do not... in FAR 19.704(a)(2) should be revised to read ``Submit a new commercial plan, 30 working days before... performance. Response: Non-concur. Although it is essential that the Central Contractor Registration, the...
ERIC Educational Resources Information Center
National Center on Safe Supportive Learning Environments, 2017
2017-01-01
Improving school climate takes time and commitment from a variety of people in a variety of roles. This document outlines key action steps to engage students in the school climate improvement process. Key action steps are provided for the following strategies: (1) Participate in planning for school climate improvements; (2) Engage stakeholders in…
ERIC Educational Resources Information Center
National Center on Safe Supportive Learning Environments, 2017
2017-01-01
Improving school climate takes time and commitment from a variety of people in a variety of roles. This document outlines how family members--including guardians of students--can support school climate improvements. Key action steps are provided for the following strategies: (1) Participate in planning for school climate improvements; (2) Engage…
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 5 2011-10-01 2011-10-01 false Health information technology planning advance... STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to the Medicaid Program § 495.336 Health information technology planning advance planning document requirements...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 42 Public Health 5 2013-10-01 2013-10-01 false Health information technology planning advance... STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to the Medicaid Program § 495.336 Health information technology planning advance planning document requirements...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 5 2012-10-01 2012-10-01 false Health information technology planning advance... STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to the Medicaid Program § 495.336 Health information technology planning advance planning document requirements...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 5 2014-10-01 2014-10-01 false Health information technology planning advance... STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to the Medicaid Program § 495.336 Health information technology planning advance planning document requirements...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 5 2010-10-01 2010-10-01 false Health information technology planning advance... STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to the Medicaid Program § 495.336 Health information technology planning advance planning document requirements...
Earth Observations and the Role of UAVs: A Capabilities Assessment
NASA Technical Reports Server (NTRS)
Cox, Timothy H.
2006-01-01
This three-volume document, based on the draft document located on the website given on page 6, presents the findings of a NASA-led capabilities assessment of Uninhabited Aerial Vehicles (UAVs) for civil (defined as non-DoD) use in Earth observations. Volume 1 is the report that presents the overall assessment and summarizes the data. The second volume contains the appendices and references to address the technologies and capabilities required for viable UAV missions. The third volume is the living portion of this effort and contains the outputs from each of the Technology Working Groups (TWGs) along with the reviews conducted by the Universities Space Research Association (USRA). The focus of this report, intended to complement the Office of the Secretary of Defense UAV Roadmap, is four-fold: 1) To determine and document desired future Earth observation missions for all UAVs based on user-defined needs; 2) To determine and document the technologies necessary to support those missions; 3) To discuss the present state of the art platform capabilities and required technologies, including identifying those in progress, those planned, and those for which no current plans exist; 4) Provide the foundations for development of a comprehensive civil UAV roadmap. It is expected that the content of this report will be updated periodically and used to assess the feasibility of future missions. In addition, this report will provide the foundation to help influence funding decisions to develop those technologies that are considered enabling or necessary but are not contained within approved funding plans. This document is written such that each section will be supported by an Appendix that will give the reader a more detailed discussion of that section's topical materials.
Chairmanship of the Neptune/Pluto outer planets science working group
NASA Astrophysics Data System (ADS)
Stern, S. Alan
1993-11-01
The Outer Planets Science Working Group (OPSWG) is the NASA Solar System Exploration Division (SSED) scientific steering committee for the Outer Solar System missions. OPSWG consists of 19 members and is chaired by Dr. S. Alan Stern. This proposal summarizes the FY93 activities of OPSWG, describes a set of objectives for OPSWG in FY94, and outlines the SWG's activities for FY95. As chair of OPSWG, Dr. Stern will be responsible for: organizing priorities, setting agendas, conducting meetings of the Outer Planets SWG; reporting the results of OPSWG's work to SSED; supporting those activities relating to OPSWG work, such as briefings to the SSES, COMPLEX, and OSS; supporting the JPL/SAIC Pluto study team; and other tasks requested by SSED. As the Scientific Working Group (SWG) for Jupiter and the planets beyond, OPSWG is the SSED SWG chartered to study and develop mission plans for all missions to the giant planets, Pluto, and other distant objects in the remote outer solar system. In that role, OPSWG is responsible for: defining and prioritizing scientific objectives for missions to these bodies; defining and documenting the scientific goals and rationale behind such missions; defining and prioritizing the datasets to be obtained in these missions; defining and prioritizing measurement objectives for these missions; defining and documenting the scientific rationale for strawman instrument payloads; defining and prioritizing the scientific requirements for orbital tour and flyby encounter trajectories; defining cruise science opportunities plan; providing technical feedback to JPL and SSED on the scientific capabilities of engineering studies for these missions; providing documentation to SSED concerning the scientific goals, objectives, and rationale for the mission; interfacing with other SSED and OSS committees at the request of SSED's Director or those committee chairs; providing input to SSED concerning the structure and content of the Announcement of Opportunity for payload and scientific team selection for such missions; and providing other technical or programmatic inputs concerning outer solar system missions at the request of the Director of SSED.
Chairmanship of the Neptune/Pluto outer planets science working group
NASA Technical Reports Server (NTRS)
Stern, S. Alan
1993-01-01
The Outer Planets Science Working Group (OPSWG) is the NASA Solar System Exploration Division (SSED) scientific steering committee for the Outer Solar System missions. OPSWG consists of 19 members and is chaired by Dr. S. Alan Stern. This proposal summarizes the FY93 activities of OPSWG, describes a set of objectives for OPSWG in FY94, and outlines the SWG's activities for FY95. As chair of OPSWG, Dr. Stern will be responsible for: organizing priorities, setting agendas, conducting meetings of the Outer Planets SWG; reporting the results of OPSWG's work to SSED; supporting those activities relating to OPSWG work, such as briefings to the SSES, COMPLEX, and OSS; supporting the JPL/SAIC Pluto study team; and other tasks requested by SSED. As the Scientific Working Group (SWG) for Jupiter and the planets beyond, OPSWG is the SSED SWG chartered to study and develop mission plans for all missions to the giant planets, Pluto, and other distant objects in the remote outer solar system. In that role, OPSWG is responsible for: defining and prioritizing scientific objectives for missions to these bodies; defining and documenting the scientific goals and rationale behind such missions; defining and prioritizing the datasets to be obtained in these missions; defining and prioritizing measurement objectives for these missions; defining and documenting the scientific rationale for strawman instrument payloads; defining and prioritizing the scientific requirements for orbital tour and flyby encounter trajectories; defining cruise science opportunities plan; providing technical feedback to JPL and SSED on the scientific capabilities of engineering studies for these missions; providing documentation to SSED concerning the scientific goals, objectives, and rationale for the mission; interfacing with other SSED and OSS committees at the request of SSED's Director or those committee chairs; providing input to SSED concerning the structure and content of the Announcement of Opportunity for payload and scientific team selection for such missions; and providing other technical or programmatic inputs concerning outer solar system missions at the request of the Director of SSED.
ERIC Educational Resources Information Center
Oficina de Educacion Iberoamericana, Madrid (Spain).
The Office of Iberoamerican Education, an intergovernmental body based on educational and cultural cooperation for the purpose of disseminating information, documentation, advice, and assistance in the field of education, co-sponsors (with UNESCO) the work represented in this study of library and information planning and facilities in the Andean…
Developing Your Evaluation Plans: A Critical Component of Public Health Program Infrastructure.
Lavinghouze, S Rene; Snyder, Kimberly
A program's infrastructure is often cited as critical to public health success. The Component Model of Infrastructure (CMI) identifies evaluation as essential under the core component of engaged data. An evaluation plan is a written document that describes how to monitor and evaluate a program, as well as how to use evaluation results for program improvement and decision making. The evaluation plan clarifies how to describe what the program did, how it worked, and why outcomes matter. We use the Centers for Disease Control and Prevention's (CDC) "Framework for Program Evaluation in Public Health" as a guide for developing an evaluation plan. Just as using a roadmap facilitates progress on a long journey, a well-written evaluation plan can clarify the direction your evaluation takes and facilitate achievement of the evaluation's objectives.
Maintenance of buildings: Italian examples of deviations between planned and incurred costs
NASA Astrophysics Data System (ADS)
Rebaudengo, Manuela; Piantanida, Paolo
2018-05-01
In recent years, drawing up the maintenance plan for a building has proved to be a theoretical practice, which has been expressed in the indication of a multiplicity of interventions more for caution reasons than for real needs. In this way, the document (mandatory by the Italian law both for public and private works) has been interpreted as a formal requirement: it must be part of the project, without any particular operational interest. So, the maintenance plans are more often "standard plans", not directing the user towards a specific maintenance strategy and thus consolidating the common thesis that reality is different. The paper compares, with reference to two xxx of study (offices and residence), the planned maintenance actions and those carried out, with an indication of the difference between expected and incurred costs.
Code of Federal Regulations, 2010 CFR
2010-10-01
... approve planning or design documents prepared by the Self-Governance Tribe? 137.361 Section 137.361 Public... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of the Secretary in... opportunities to approve planning or design documents prepared by the Self-Governance Tribe? Yes, but only if...
Legislative Framework for Landscape Planning in Latvia
NASA Astrophysics Data System (ADS)
Nitavska, Natalija; Zigmunde, Daiga
2017-10-01
With the adoption and the ratification of the European Landscape Convention a legally justified need for a clear landscape policy was grounded in the European countries. It includes the elaboration of the new and the improvement of the existing legislative documents on landscape planning, protection and management. The aim of the particular study is to analyse the existing legislative documents in Latvia influencing landscape planning on different scales / and the implementation of the European Landscape Convention. The study emphasizes the complex structure of the Latvian legislative framework affected by the distribution of the normative documents under the various ministries. Therefore, the main problem is unclear responsibility levels and organizational system for solving the issues regarding landscape planning, protection and management. Thus the various discussions between the involved disciplines and responsible institutions are arising. Two groups of the legislative documents influencing the implementation of the landscape policy in Latvia are detected within the study. The first group is strategic documents determining main landscape planning principles and directions at European, national, regional and professional or sectoral level. The second group is operational documents providing a set of actions for the landscape planning, protection and management at the local or the municipality level. The study concludes that operational documents developed by the municipalities are in high importance because of their direct influence on the landscape planning in Latvia. This often leads to the different landscape planning requirements included in the normative documents of the neighbouring municipalities, although the spatial and ecological borders of the visual landscape do not fit with the formal borders of the municipalities. Thus, it is essential to develop the common principles and actions that would be incumbent on all municipalities to provide the landscape integrity and to protect its values according to the main principles defined in the European Landscape Convention.
Document reconstruction by layout analysis of snippets
NASA Astrophysics Data System (ADS)
Kleber, Florian; Diem, Markus; Sablatnig, Robert
2010-02-01
Document analysis is done to analyze entire forms (e.g. intelligent form analysis, table detection) or to describe the layout/structure of a document. Also skew detection of scanned documents is performed to support OCR algorithms that are sensitive to skew. In this paper document analysis is applied to snippets of torn documents to calculate features for the reconstruction. Documents can either be destroyed by the intention to make the printed content unavailable (e.g. tax fraud investigation, business crime) or due to time induced degeneration of ancient documents (e.g. bad storage conditions). Current reconstruction methods for manually torn documents deal with the shape, inpainting and texture synthesis techniques. In this paper the possibility of document analysis techniques of snippets to support the matching algorithm by considering additional features are shown. This implies a rotational analysis, a color analysis and a line detection. As a future work it is planned to extend the feature set with the paper type (blank, checked, lined), the type of the writing (handwritten vs. machine printed) and the text layout of a snippet (text size, line spacing). Preliminary results show that these pre-processing steps can be performed reliably on a real dataset consisting of 690 snippets.
Toward implementation of a national ground water monitoring network
Schreiber, Robert P.; Cunningham, William L.; Copeland, Rick; Frederick, Kevin D.
2008-01-01
The Federal Advisory Committee on Water Information's (ACWI) Subcommittee on Ground Water (SOGW) has been working steadily to develop and encourage implementation of a nationwide, long-term ground-water quantity and quality monitoring framework. Significant progress includes the planned submission this fall of a draft framework document to the full committee. The document will include recommendations for implementation of the network and continued acknowledgment at the federal and state level of ACWI's potential role in national monitoring toward an improved assessment of the nation's water reserves. The SOGW mission includes addressing several issues regarding network design, as well as developing plans for concept testing, evaluation of costs and benefits, and encouraging the movement from pilot-test results to full-scale implementation within a reasonable time period. With the recent attention to water resource sustainability driven by severe droughts, concerns over global warming effects, and persistent water supply problems, the SOGW mission is now even more critical.
Northwest Forest Plan research synthesis.
Richard W. Haynes; Gloria E. Perez; [tech. eds.].
2000-01-01
This document synthesizes research accomplishments initiated and funded under the Northwest Forest Plan or the Presidentâs Forest Plan (hereafter referred to as the Forest Plan) since its inception in 1994. Three major parts in this document cover, the context for this effort, eight Forest Plan research accomplishments, and a synthesis. The eight accomplishments...
NASA Astrophysics Data System (ADS)
Bonenberg, Wojciech
2015-06-01
The article presents a report on studies concerning the role of planning documents in the modernization process of the Poznań metropolitan area (PMA). Over the last 25 years, dynamic social, economic and spatial changes have taken place in this area, which is becoming an increasingly integrated place combining living, work and leisure for a million residents. Emerging challenges regarding the functional, spatial and infrastructural modernization of the PMA call for new planning methods. In this respect, the existing planning documents and methods by which they are prepared are not able to keep up with the ongoing changes and constitute an obstacle in the modernization of the metropolitan area. The purpose of the article is to identify the risks posed by the discrepancies of existing planning records. Recommendations aimed at adapting the planning documents to the challenges of modernizing the PMA have also been presented. W artykule przedstawiono sprawozdanie z badań dotyczących roli dokumentów planistycznych w procesie modernizacji poznańskiego obszaru metropolitalnego (POM). W ostatnich 25 latach nastąpiły dynamiczne zmiany społeczne, gospodarcze i przestrzenne na tym obszarze, który stanowi coraz bardziej zintegrowane miejsce wspólnego zamieszkania, pracy i rekreacji dla miliona mieszkańców. Rodzące się wyzwania dotyczące modernizacji funkcjonalnej, przestrzennej i infrastrukturalnej POM wymagają nowych metod planistycznych. W tym zakresie istniejące dokumenty planistyczne oraz metody ich sporządzania, nie nadążają za postępującymi zmianami i stanowią przeszkodę w modernizacji obszaru metropolitalnego. Celem referatu jest identyfikacja zagrożeń wynikających z niespójności istniejących zapisów planistycznych. Przedstawiono również rekomendacje mające służyć dostosowaniu dokumentów planistycznych do wyzwań modernizacyjnych POM.
Solid waste information and tracking system client-server conversion project management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
May, D.L.
1998-04-15
This Project Management Plan is the lead planning document governing the proposed conversion of the Solid Waste Information and Tracking System (SWITS) to a client-server architecture. This plan presents the content specified by American National Standards Institute (ANSI)/Institute of Electrical and Electronics Engineers (IEEE) standards for software development, with additional information categories deemed to be necessary to describe the conversion fully. This plan is a living document that will be reviewed on a periodic basis and revised when necessary to reflect changes in baseline design concepts and schedules. This PMP describes the background, planning and management of the SWITS conversion.more » It does not constitute a statement of product requirements. Requirements and specification documentation needed for the SWITS conversion will be released as supporting documents.« less
Valentin, Andreas; Ferdinande, Patrick
2011-10-01
To provide guidance and recommendations for the planning or renovation of intensive care units (ICUs) with respect to the specific characteristics relevant to organizational and structural aspects of intensive care medicine. The Working Group on Quality Improvement (WGQI) of the European Society of Intensive Care Medicine (ESICM) identified the basic requirements for ICUs by a comprehensive literature search and an iterative process with several rounds of consensus finding with the participation of 47 intensive care physicians from 23 countries. The starting point of this process was an ESICM recommendation published in 1997 with the need for an updated version. The document consists of operational guidelines and design recommendations for ICUs. In the first part it covers the definition and objectives of an ICU, functional criteria, activity criteria, and the management of equipment. The second part deals with recommendations with respect to the planning process, floorplan and connections, accommodation, fire safety, central services, and the necessary communication systems. This document provides a detailed framework for the planning or renovation of ICUs based on a multinational consensus within the ESICM.
Thomeer, Mieke Beth; Donnelly, Rachel; Reczek, Corinne; Umberson, Debra
2017-12-01
Two key components of end-of-life planning are (1) informal discussions about future care and other end-of-life preferences and (2) formal planning via living wills and other legal documents. We leverage previous work on the institutional aspects of marriage and on sexual-minority discrimination to theorize why and how heterosexual, gay, and lesbian married couples engage in informal and formal end-of-life planning. We analyze qualitative dyadic in-depth interviews with 45 midlife gay, lesbian, and heterosexual married couples ( N = 90 spouses). Findings suggest that same-sex spouses devote considerable attention to informal planning conversations and formal end-of-life plans, while heterosexual spouses report minimal formal or informal planning. The primary reasons same-sex spouses give for making end-of-life preparations are related to the absence of legal protections and concerns about discrimination from families. These findings raise questions about future end-of-life planning for same- and different-sex couples given a rapidly shifting legal and social landscape.
Jayasuriya, R; Sim, A B
1998-01-01
Hospitals are under pressure to respond to new challenges and competition. Many hospitals have used strategic planning to respond to these environmental changes. This exploratory study examines the extent of strategic planning in hospitals in two Australian States, New South Wales and Victoria, using a sample survey. Based on planning documentation, the study indicated that 47% of the hospitals surveyed did not have a strategic or business plan. A significant difference was found in the comprehensiveness of the plans between the two States. Plans from Victorian hospitals had more documented evidence of external/internal analysis, competitor orientation and customer orientation compared with plans from New South Wales hospitals. The paper discusses the limitations of the study and directions for future research.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnson, Gary E.; Thom, Ronald M.; Whiting, Allan H.
The Bonneville Power Administration (BPA), in coordination with the U. S. Army Corps of Engineers (COE) and NOAA Fisheries, originated this project (BPA Project No. 2002-076; Contract No. DE-AC06-76RL01830, Release No. 652-24). Their intent was to develop a useful habitat restoration plan for the lower Columbia River and estuary to help guide restoration efforts and fulfill Reasonable and Prudent Alternative Action 159 of the 2000 National Marine Fisheries Service Biological Opinion on operation of the Federal Columbia River Power System. This document focuses on salmon habitat, although its ecosystem-based approach necessarily affects other species as well. Salmon habitat restoration ismore » best undertaken within the context of other biota and physical processes using an ecosystem perspective. The anticipated audience for the plan includes entities responsible for, interested in, or affected by habitat restoration in the lower Columbia River and estuary. Timeframes to apply this plan extend from the immediate (2003-2004) to the near-term (2005-2006) to the long-term (2007 and beyond). We anticipate and encourage that the plan be revised as new knowledge and experience are attained. A team comprised of the Columbia River Estuary Study Taskforce (CREST), the Lower Columbia River Estuary Partnership (Estuary Partnership), and Pacific Northwest National Laboratory (PNNL) wrote this document. The BPA and the COE, as the responsible Action Agencies, provided technical oversight. The Estuary Partnership's Science Work Group, NOAA Fisheries Habitat Conservation Division, Northwest Power Planning Council (NPPC) staff, and state and tribal fisheries management agencies reviewed drafts. The Independent Scientific Advisory Board of the NPPC reviewed and commented on the 90% draft. Revisions were incorporated into the final draft document subsequently released for public review. Extensive efforts were made to ensure a sound technical and policy basis and to solicit input from all interested parties.« less
NASA Technical Reports Server (NTRS)
2002-01-01
The Mission of the NSBRI will be to lead a National effort for accomplishing the integrated, critical path, biomedical research necessary to support the long term human presence, development, and exploration of space and to enhance life on Earth by applying the resultant advances in human knowledge and technology acquired through living and working in space. To carry out this mission, the NSBRI focuses its activities on three Strategic Programs: Strategic Program 1: Countermeasure Research Strategic Program 2: Education, Training and Outreach Strategic Program 3: Cooperative Research and Development. This document contains the detailed Team Strategic Plans for the 11 research teams focused on Strategic Program 1, and the Education and Outreach Team focused on Strategic Program 2. There is overlap and integration among the Programs and Team Strategic Plans, as described in each of the Plans.
Surface-Water Quality-Assurance Plan for the Tallahassee Office, U.S. Geological Survey
Tomlinson, Stewart A.
2006-01-01
This Tallahassee Office Surface-Water Quality-Assurance Plan documents the standards, policies, and procedures used by the Tallahassee Office for activities related to the collection, processing, storage, analysis, and publication of surface-water data. This plan serves as a guide to all Tallahassee Office personnel involved in surface-water data activities, and changes as the needs and requirements of the Tallahassee Office, Florida Integrated Science Center, and Water Discipline change. Reg-ular updates to this Plan represent an integral part of the quality-assurance process. In the Tallahassee Office, direct oversight and responsibility by the employee(s) assigned to a surface-water station, combined with team approaches in all work efforts, assure high-quality data, analyses, reviews, and reports for cooperating agencies and the public.
Planning for the Global Earth Observation System of Systems (GEOSS)
Christian, E.
2005-01-01
The Group on Earth Observations was established to promote comprehensive, coordinated, and sustained Earth observations. Its mandate is to implement the Global Earth Observation System of Systems (GEOSS) in accord with the GEOSS 10-Year Implementation Plan and Reference Document. During the months over which the GEOSS Implementation Plan was developed, many issues surfaced and were addressed. This article discusses several of the more interesting or challenging of those issues-e.g. fitting in with existing organizations and securing stable funding - some of which have yet to be resolved fully as of this writing. Despite the relatively short period over which the Implementation Plan had to be developed, there is a good chance that the work undertaken will be influential for decades to come. ?? 2005 Elsevier Ltd. All rights reserved.
Development and evaluation of an aged care specific Advance Care Plan.
Silvester, William; Parslow, Ruth A; Lewis, Virginia J; Fullam, Rachael S; Sjanta, Rebekah; Jackson, Lynne; White, Vanessa; Hudson, Rosalie
2013-06-01
To report on the quality of advance care planning (ACP) documents in use in residential aged care facilities (RACF) in areas of Victoria Australia prior to a systematic intervention; to report on the development and performance of an aged care specific Advance Care Plan template used during the intervention. An audit of the quality of pre-existing documentation used to record resident treatment preferences and end-of-life wishes at participating RACFs; development and pilot of an aged care specific Advance Care Plan template; an audit of the completeness and quality of Advance Care Plans completed on the new template during a systematic ACP intervention. 19 selected RACFs (managed by 12 aged care organisations) in metropolitan and regional areas of Victoria. Documentation in use at facilities prior to the ACP intervention most commonly recorded preferences regarding hospital transfer, life prolonging treatment and personal/cultural/religious wishes. However, 7 of 12 document sets failed to adequately and clearly specify the resident's preferences as regards life prolonging medical treatment. The newly developed aged care specific Advance Care Plan template was met with approval by participating RACFs. Of 203 Advance Care Plans completed on the template throughout the project period, 49% included the appointment of a Medical Enduring Power of Attorney. Requests concerning medical treatment were specified in almost all completed documents (97%), with 73% nominating the option of refusal of life-prolonging treatment. Over 90% of plans included information concerning residents' values and beliefs, and future health situations that the resident would find to be unacceptable were specified in 78% of completed plans. Standardised procedures and documentation are needed to improve the quality of processes, documents and outcomes of ACP in the residential aged care sector.
End-of-life care of oncology inpatients: Are we getting it right?
Batten, Monique; Nguyen, Bella; Burke, Brandon; Harryanto, Hilman; Mitchell, Imogen; Davis, Alison
2018-06-13
To examine the current patterns of end-of-life care of medical oncology patients dying in an Australian tertiary acute hospital setting in order to determine potential areas for improvement. A retrospective observational study was undertaken of 295 consecutive adult medical oncology inpatients dying between 2010 and 2015. Charts were reviewed for evidence of (1) resuscitation plans, (2) acute interventions in the 48-h period prior to death, (3) palliative care involvement and (4) recognition of the dying patient and comfort care plans. At the time of death, 98% of patients had a resuscitation plan, 71% of which were completed by the medical oncology team. Fifty-nine percent of medical emergency team reviews occurred in patients without a documented resuscitation plan. Within 48 h of death, active interventions were still being given to 64% of patients in the total patient population. Comfort care plans were documented in 86% of patients; however, 62% of these were only documented within 48 h of death and 20% of patients with a documented comfort care plan still received noncomfort measures. There was a high level of documented resuscitation plans, comfort care plans and recognition of dying. However, active interventions were common within 48 h of death, and comfort care plans and recognition of dying often occurred late. These data indicate a gap between documenting a resuscitation plan and providing timely and appropriate end-of-life care. Understanding the gaps in delivering appropriate care provides an opportunity for improving end-of-life care. © 2018 John Wiley & Sons Australia, Ltd.
Code of Federal Regulations, 2010 CFR
2010-04-01
... and Research Funds § 420.111 What are the documentation requirements for use of FHWA planning and... 23 Highways 1 2010-04-01 2010-04-01 false What are the documentation requirements for use of FHWA planning and research funds? 420.111 Section 420.111 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF...
Code of Federal Regulations, 2010 CFR
2010-04-01
...-DETERMINATION AND EDUCATION ACT Other Financial Assistance for Planning and Negotiation Grants for Non-BIA... documents received or utilized after OSG has made a decision on a planning grant application? 1000.69... selection documents received or utilized after OSG has made a decision on a planning grant application? A...
Work Breakdown Structure (WBS) and WBS dictionary. [advanced x ray astrophysics facility (AXAF)
NASA Technical Reports Server (NTRS)
Cocuzzo, F.
1994-01-01
This document is intended to provide the framework for defining all work to be accomplished under the proposed contract for the mission support program as defined by Section J-1 Statement of Work (SOW) of the RFP No.8-1-3-TA-50030 dated 11/2/93. The time period of performance of this contract will be from 3/1/94 through to the end of fiscal 1999. In addition to providing the framework for the integration of the cost, schedule, and manpower planning necessary to accomplish this work it establishes the association among the WBS elements, the SOW, and the Technical Proposal.
3 CFR - Unified Command Plan 2011
Code of Federal Regulations, 2012 CFR
2012-01-01
... 3 The President 1 2012-01-01 2012-01-01 false Unified Command Plan 2011 Presidential Documents Other Presidential Documents Memorandum of April 6, 2011 Unified Command Plan 2011 Memorandum for the... implementation of the revised Unified Command Plan. Consistent with title 10, United States Code, section 161(b...
75 FR 9334 - Multiemployer Pension Plan Information Made Available on Request
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-02
..., strategies) that, if disclosed by the plan, may cause, or increase a reasonable risk of, financial harm to... certain actuarial and financial documents about the plan to participants, beneficiaries, employee... request, shall furnish copies of certain actuarial and financial documents to any plan participant...
Dodge, Kent A.; Lambing, John H.
2006-01-01
A quality-assurance plan has been developed for use by the sediment laboratory of the U.S. Geological Survey Montana Water Science Center in conducting activities related to the analysis of suspended sediment. The plan documents quality-assurance policies for sediment-laboratory certification, personnel responsibilities and training, documentation requirements, and laboratory safety. The plan also documents quality-assurance procedures related to laboratory equipment and supplies, sample management, sample analysis, analytical quality control, and data management.
222-S Laboratory Quality Assurance Plan. Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Meznarich, H.K.
1995-07-31
This Quality Assurance Plan provides,quality assurance (QA) guidance, regulatory QA requirements (e.g., 10 CFR 830.120), and quality control (QC) specifications for analytical service. This document follows the U.S Department of Energy (DOE) issued Hanford Analytical Services Quality Assurance Plan (HASQAP). In addition, this document meets the objectives of the Quality Assurance Program provided in the WHC-CM-4-2, Section 2.1. Quality assurance elements required in the Guidelines and Specifications for Preparing Quality Assurance Program Plans (QAMS-004) and Interim Guidelines and Specifications for Preparing Quality Assurance Project Plans (QAMS-005) from the US Environmental Protection Agency (EPA) are covered throughout this document. A qualitymore » assurance index is provided in the Appendix A. This document also provides and/or identifies the procedural information that governs laboratory operations. The personnel of the 222-S Laboratory and the Standards Laboratory including managers, analysts, QA/QC staff, auditors, and support staff shall use this document as guidance and instructions for their operational and quality assurance activities. Other organizations that conduct activities described in this document for the 222-S Laboratory shall follow this QA/QC document.« less
ERIC Educational Resources Information Center
Cahill, Deborah, Comp.; And Others
This handbook acquaints special needs students with programs and opportunities available to help them make the transition from school to working. The guide helps students identify their personal strengths, identify goals for the future, determine skills needed to reach those goals, and determine help needed from others. The body of the guide…
Sure-Fire Presentations. Bar/School Partnership Programs. [Revised.
ERIC Educational Resources Information Center
Gallagher, Arlene; And Others
The purpose of this document is to give lawyers who are planning to work with students some practical advice that will make their presentations more effective. The advice should be helpful as lawyers make school visits for Law Day or even if they visit several times. As the article suggests, the first step is for the attorney to get to know the…
ERIC Educational Resources Information Center
McKnight, Lucinda
2018-01-01
This article looks to three inspirational Black women, bell hooks, Stacey McBride-Irby and Patricia Williams, in the pursuit of radical curriculum. While today curriculum is critiqued as racialised, gendered, sexualised and classed, the formats of curriculum documents such as text books, units of work and lesson plans have changed little. These…
Wood Block and Toy Project. Designed for Diversely-Abled Senior Volunteers.
ERIC Educational Resources Information Center
Dugan, Willis E.
This document describes a volunteer work project designed for nursing home and day-care center persons with minimal physical skills. Potential users of the project are cautioned to plan carefully for the host location where the project will be conducted, as the location must be easily accessible to older adults who may be handicapped and who may…
Turbulence modeling for hypersonic flight
NASA Technical Reports Server (NTRS)
Bardina, Jorge E.
1993-01-01
The objective of the proposed work is to continue to develop, verify, and incorporate the baseline two-equation turbulence models, which account for the effects of compressibility at high speeds, into a three-dimensional Reynolds averaged Navier-Stokes (RANS) code. Additionally, we plan to provide documented descriptions of the models and their numerical procedures so that they can be implemented into the NASP CFD codes.
ERIC Educational Resources Information Center
Romaniuk, Gene, Ed.
This report of a symposium for educators in the province of Alberta provides background information on the symposium, a set of six major recommendations made by the participants, reports from the working groups to which participants were assigned; and the text of 12 papers presented at the meeting. The nine chapters of the report document the…
Tank waste remediation system multi-year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less
Tank waste remediation system multi-year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-09-01
The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less
NASA Astrophysics Data System (ADS)
Schuster, J. C.
2017-08-01
The tablet-based software docu-tools digitize the documentation of buildings, simplifies construction and facility management and the data analysis in building and construction-history research. As a plan-based software, `pins' can be set to record data (images, audio, text etc.), each data point containing a time and date stamp. Once a pin is set and information recorded, it can never be deleted from the system, creating clear contentious-free documentation. Reports to any/all data recorded can immediately be generated through various templates in order to share, document, analyze and archive the information gathered. The software both digitizes building condition assessment, as well as simplifies the fully documented management and solving of problems and monitoring of a building. Used both in the construction industry and for documenting and analyzing historic buildings, docu-tools is a versatile and flexible tool that has become integral to my work as a building historian working on the conservation and curating of the historic built environment in Europe. I used the software at Boughton House, Northamptonshire, UK, during a one-year research project into the construction history of the building. The details of how docu-tools was used during this project will be discussed in this paper.
42 CFR 495.326 - Disallowance of FFP.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., requirements, and other undertakings described in the approved HIT planning advance planning document and HIT implementation advance planning document to the detriment of the proper and efficient operation of the Medicaid program, payment of FFP may be disallowed. In the case of a suspension of approval of a HIT planning...
Connected Vehicle Impacts on Transportation Planning—Outreach to Planning Community.
DOT National Transportation Integrated Search
2016-06-01
This document presents outreach memos on 11 case studies analyzing the impacts of connected and automated vehicles (C/AV) on transportation planning products. These 11 case studies are documented indepth in the associated project document entitled Co...
U.S. Coast Guard Telecommunications Plan (TCP) - Development Document
DOT National Transportation Integrated Search
1997-04-28
The Coast Guard Telecommunications Plan (TCP) describes the near to mid-term telecommunications goals and objectives for Command, Control, and Communications (C3) support. It is intended to document internal telecommunications planning and to provide...
Risk Quantification of Systems Engineering Documents Improves Probability of DOD Project Success
2009-09-01
comprehensive risk model for DoD milestone review documentation as well as recommended changes to the Capability Maturity Model Integration ( CMMI ) Project...Milestone Documentation, Project Planning, Rational Frame, Political Frame, CMMI Project Planning Process Area, CMMI Risk Management Process Area...well as recommended changes to the Capability Maturity Model Integration ( CMMI ) Project Planning and Risk Management process areas. The intent is to
ISDP salt batch #2 supernate qualification
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peters, T. B.; Nash, C. A.; Fink, S. D.
2009-01-05
This report covers the laboratory testing and analyses of the second Integrated Salt Disposition Project (ISDP) salt supernate samples, performed in support of initial radioactive operations of Actinide Removal Process (ARP) and Modular Caustic-Side Solvent Extraction Unit (MCU). Major goals of this work include characterizing Tank 22H supernate, characterizing Tank 41H supernate, verifying actinide and strontium adsorption with a standard laboratory-scale test using monosodium titanate (MST) and filtration, and checking cesium mass transfer behavior for the MCU solvent performance when contacted with the liquid produced from MST contact. This study also includes characterization of a post-blend Tank 49H sample asmore » part of the Nuclear Criticality Safety Evaluation (NCSE). This work was specified by Task Technical Request and by Task Technical and Quality Assurance Plan (TTQAP). In addition, a sampling plan will be written to guide analytical future work. Safety and environmental aspects of the work were documented in a Hazard Assessment Package.« less
Decoupling the use and meaning of strategic plans in public healthcare
2013-01-01
Background The culture of New Public Management has promoted the diffusion of strategic management tools throughout Public Healthcare Organisations (PHOs). There is consensus that better strategic planning tools are required to achieve higher levels of organisational performance. This paper provides evidence and understanding of the emergent uses and scope of strategic planning in PHOs, in order to answer three research questions: (i) has the New Public Management approach changed the organisational culture of PHOs in terms of how they adopt, diffuse, and use strategic planning documents? (ii) how coherent are strategic planning documents in PHOs? and (iii) what are the main purposes of strategic documents in PHOs? Methods An analysis was carried out in three Italian Local Health Authorities. We analysed the number and types of formal strategic documents adopted between 2004 and 2012, evaluating their degree of coherence and coordination, their hierarchy, their degree of disclosure, and the consistency of their strategic goals. A content analysis was performed to investigate overlap in terms of content and focus, and a qualitative analysis was carried out to study and represent the relationships between documents. Results The analysis showed that a rich set of strategic documents were adopted by each PHO. However, these are often uncoordinated and overlap in terms of content. They adopt different language and formats for various stakeholders. The presence of diverse external drivers may explain the divergent focus, priorities and inconsistent goals in the strategic documents. This planning complexity makes it difficult to determine how the overall goals and mission of an organisation are defined and made visible. Conclusions The evidence suggests that PHOs use a considerable number of strategic documents. However, they employ no clear or explicit overarching strategy currently, and strategic planning appears to be externally oriented. All the documents communicate similar topics to different stakeholders, although they use different language to answer to the different expectations of each stakeholder. Therefore, strategic planning and plans seem to be driven by neo-institutional approaches, as they are means to build consensus and negotiate ground for strategic actions, rather than means to identify strategic choices and priorities. PMID:23289527
Decoupling the use and meaning of strategic plans in public healthcare.
Lega, Federico; Longo, Francesco; Rotolo, Andrea
2013-01-04
The culture of New Public Management has promoted the diffusion of strategic management tools throughout Public Healthcare Organisations (PHOs). There is consensus that better strategic planning tools are required to achieve higher levels of organisational performance. This paper provides evidence and understanding of the emergent uses and scope of strategic planning in PHOs, in order to answer three research questions: (i) has the New Public Management approach changed the organisational culture of PHOs in terms of how they adopt, diffuse, and use strategic planning documents? (ii) how coherent are strategic planning documents in PHOs? and (iii) what are the main purposes of strategic documents in PHOs? An analysis was carried out in three Italian Local Health Authorities. We analysed the number and types of formal strategic documents adopted between 2004 and 2012, evaluating their degree of coherence and coordination, their hierarchy, their degree of disclosure, and the consistency of their strategic goals. A content analysis was performed to investigate overlap in terms of content and focus, and a qualitative analysis was carried out to study and represent the relationships between documents. The analysis showed that a rich set of strategic documents were adopted by each PHO. However, these are often uncoordinated and overlap in terms of content. They adopt different language and formats for various stakeholders. The presence of diverse external drivers may explain the divergent focus, priorities and inconsistent goals in the strategic documents. This planning complexity makes it difficult to determine how the overall goals and mission of an organisation are defined and made visible. The evidence suggests that PHOs use a considerable number of strategic documents. However, they employ no clear or explicit overarching strategy currently, and strategic planning appears to be externally oriented. All the documents communicate similar topics to different stakeholders, although they use different language to answer to the different expectations of each stakeholder. Therefore, strategic planning and plans seem to be driven by neo-institutional approaches, as they are means to build consensus and negotiate ground for strategic actions, rather than means to identify strategic choices and priorities.
Methods for Estimating Environmental Effects and Constraints on NexGen: High Density Case Study
NASA Technical Reports Server (NTRS)
Augustine, S.; Ermatinger, C.; Graham, M.; Thompson, T.
2010-01-01
This document provides a summary of the current methods developed by Metron Aviation for the estimate of environmental effects and constraints on the Next Generation Air Transportation System (NextGen). This body of work incorporates many of the key elements necessary to achieve such an estimate. Each section contains the background and motivation for the technical elements of the work, a description of the methods used, and possible next steps. The current methods described in this document were selected in an attempt to provide a good balance between accuracy and fairly rapid turn around times to best advance Joint Planning and Development Office (JPDO) System Modeling and Analysis Division (SMAD) objectives while also supporting the needs of the JPDO Environmental Working Group (EWG). In particular this document describes methods applied to support the High Density (HD) Case Study performed during the spring of 2008. A reference day (in 2006) is modeled to describe current system capabilities while the future demand is applied to multiple alternatives to analyze system performance. The major variables in the alternatives are operational/procedural capabilities for airport, terminal, and en route airspace along with projected improvements to airframe, engine and navigational equipment.
Care plans and care planning in long-term conditions: a conceptual model.
Burt, Jenni; Rick, Jo; Blakeman, Thomas; Protheroe, Joanne; Roland, Martin; Bower, Pete
2014-10-01
The prevalence and impact of long-term conditions continues to rise. Care planning for people with long-term conditions has been a policy priority for chronic disease management in a number of health-care systems. However, patients and providers appear unclear about the formulation and implementation of care planning. Further work in this area is therefore required to inform the development, implementation and evaluation of future care planning initiatives. We distinguish between 'care planning' (the process by which health-care professionals and patients discuss, agree and review an action plan to achieve the goals or behaviour change of most relevance and concern to the patient) and a 'care plan' (a written document recording the outcome of a care planning process). We propose a typology of care planning and care plans with three core dimensions: perspective (patient or professional), scope (a focus on goals or on behaviours) and networks (confined to the professional-patient dyad or extending to the entire care network). In addition, we draw on psychological models of mediation and moderation to outline potential mechanisms through which care planning and care plans may lead to improved outcomes for both patients and the wider health-care system. The proposed typology of care planning and care plans offered here, along with the model of the process by which care planning may influence outcomes, provide a useful framework for future policy developments and evaluations. Empirical work is required to explore the degree to which current care planning approaches and care plans can be described according to these dimensions, and the factors that determine which types of patients and professionals use which type of care plans.
Space station WP-04 power system preliminary analysis and design document, volume 3
NASA Technical Reports Server (NTRS)
1986-01-01
Rocketdyne plans to generate a system level specification for the Space Station Electric Power System (EPS) in order to facilitate the usage, accountability, and tracking of overall system level requirements. The origins and status of the verification planning effort are traced and an overview of the Space Station program interactions are provided. The work package level interfaces between the EPS and the other Space Station work packages are outlined. A trade study was performed to determine the peaking split between PV and SD, and specifically to compare the inherent total peaking capability with proportionally shared peaking. In order to determine EPS cost drivers for the previous submittal of DRO2, the life cycle cost (LCC) model was run to identify the more significant costs and the factors contributing to them.
NASA Technical Reports Server (NTRS)
Burcham, Michael S.; Daprato, Rebecca C.
2016-01-01
This document presents the design details for an Interim Measure (IM) Work Plan (IMWP) for the Mobile Launch Platform/Vehicle Assembly Building (MLPV) Area, located at the John F. Kennedy Space Center (KSC), Florida. The MLPV Area has been designated Solid Waste Management Unit Number 056 (SWMU 056) under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This report was prepared by Geosyntec Consultants (Geosyntec) for the National Aeronautics and Space Administration (NASA) under contract number NNK09CA02B and NNK12CA13B, project control number ENV1642. The Advanced Data Package (ADP) presentation covering the elements of this IMWP report received KSC Remediation Team (KSCRT) approval at the December 2015 Team Meeting; the meeting minutes are included in Appendix A.
NASA Technical Reports Server (NTRS)
Savin, Stephen C.
2005-01-01
The MER project includes two rovers working simultaneously on opposite sides of Mars each receiving commands only once a day. Creating this uplink is critical, since a failed uplink means a lost day and a waste of money. Examining the process of creating this uplink, I tracked the use of the system developed for requesting observations as well as the development, from stage to stage, in forming an activity plan. I found the system for requesting observations was commonly misused, if used at all. There are half a dozen reports to document the creation of the uplink plan and often there are discrepancies among them. Despite this, the uplink process worked very well and MER has been one of the most successful missions for NASA in recent memory. Still it is clear there is room for improvement.
Climate Change Adaptation Practices in Various Countries
NASA Astrophysics Data System (ADS)
Tanik, A.; Tekten, D.
2017-08-01
The paper will be a review work on the recent strategies of EU in general, and will underline the inspected sectoral based adaptation practices and action plans of 7 countries; namely Germany, France, Spain, Italy, Denmark, USA and Kenya from Africa continent. Although every countries’ action plan have some similarities on sectoral analysis, each country in accordance with the specific nature of the problem seems to create its own sectoral analysis. Within this context, green and white documents of EU adaptation to climate change, EU strategy on climate change, EU targets of 2020 on climate change and EU adaptation support tools are investigated.
Decontamination and decommissioning plan for processing contaminated NaK at the INEL
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaRue, D.M.; Dolenc, M.R.
1986-09-01
This decontamination and decommissioning (D D) plan describes the work elements and project management plan for processing four containers of contaminated sodium/potassium (NaK) and returning the Army Reentry Vehicle Facility Site (ARVFS) to a reusable condition. The document reflects the management plan for this project before finalizing the conceptual design and preliminary prototype tests of the reaction kinetics. As a result, the safety, environmental, and accident analyses are addressed as preliminary assessments before completion at a later date. ARVFS contains an earth-covered bunker, a cylindrical test pit and metal shed, and a cable trench connecting the two items. The bunkermore » currently stores the four containers of NaK from the meltdown of the EBR-1 Mark II core. The D D project addressed in this plan involves processing the contaminated NaK and returning the ARVFS to potential reuse after cleanup.« less
Decontamination and decommissioning plan for processing contaminated NaK at the INEL
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaRue, D.M.; Dolenc, M.R.
1986-09-01
This decontamination and decommissioning (D&D) plan describes the work elements and project management plan for processing four containers of contaminated sodium/potassium (NaK) and returning the Army Reentry Vehicle Facility Site (ARVFS) to a reusable condition. The document reflects the management plan for this project before finalizing the conceptual design and preliminary prototype tests of the reaction kinetics. As a result, the safety, environmental, and accident analyses are addressed as preliminary assessments before completion at a later date. ARVFS contains an earth-covered bunker, a cylindrical test pit and metal shed, and a cable trench connecting the two items. The bunker currentlymore » stores the four containers of NaK from the meltdown of the EBR-1 Mark II core. The D&D project addressed in this plan involves processing the contaminated NaK and returning the ARVFS to potential reuse after cleanup.« less
The plan to coordinate NEHRP post-earthquake investigations
Holzer, Thomas L.; Borcherdt, Roger D.; Comartin, Craig D.; Hanson, Robert D.; Scawthorn, Charles R.; Tierney, Kathleen; Youd, T. Leslie
2003-01-01
This is the plan to coordinate domestic and foreign post-earthquake investigations supported by the National Earthquake Hazards Reduction Program (NEHRP). The plan addresses coordination of both the NEHRP agencies—Federal Emergency Management Agency (FEMA), National Institute of Standards and Technology (NIST), National Science Foundation (NSF), and U. S. Geological Survey (USGS)—and their partners. The plan is a framework for both coordinating what is going to be done and identifying responsibilities for post-earthquake investigations. It does not specify what will be done. Coordination is addressed in various time frames ranging from hours to years after an earthquake. The plan includes measures for (1) gaining rapid and general agreement on high-priority research opportunities, and (2) conducting the data gathering and fi eld studies in a coordinated manner. It deals with identifi cation, collection, processing, documentation, archiving, and dissemination of the results of post-earthquake work in a timely manner and easily accessible format.
Dein, F. Joshua; Baeten, Laurie A.; Moore, Melody K.; Samuel, Michael D.; Miller, Paul D.; Murphy, Christopher; Sissler, Steven; Jeske, Clinton W.; Jehl, Joseph R.; Yaeger, J. S.; Bauer, B.; Mahoney, Shiela A.
1997-01-01
This Final Report is a review of work on a cooperative study undertaken by the USGS Biological Resources Division's National Wildlife Health Center (NWHC) and National Wetlands Research Center (NWRC; formerly the Southern Science Center) from 1994 through 1997. The study was initiated at the request of the Bureau of Land Management (BLM), through a request to the former National Biological Service. The Southeastern New Mexico Playa Lakes Coordinating Committee (SENMPLCC) played an important role in outlining the research needs. The initial Study Plan document, which outlines the background, objectives and methods for the first two years is available as Appendix 1. A letter indicating modifications to the Study Plan was sent to the SENMPLCC chair on April 25,1995, and is Appendix 2. An Interim Report, covering this work was completed and submitted in September 1995. The Literature Review section of the study was completed and presented to SENMPLCC in August, 1995. Following SENMPLCC review, NWHC was asked to develop a series of questions that could be posed from information gained in the initial phase (Appendix 3). The NWHC and NWRC were then directed to begin work to answer the top three questions, within the available fiscal resources. NWRC could continue with work outlined under the original Study Plan (Appendix 1), however an additional Study Plan for experiments performed by NWHC and collaborators and is available as Appendix 4.
Early work patterns for gynaecological cancer survivors in the USA.
Nachreiner, N M; Ghebre, R G; Virnig, B A; Shanley, R
2012-01-01
Little is known about the balance between work demands and treatment plans for >4.3 million working-age cancer survivors in the USA. To describe changes in work status for gynaecological cancer survivors during the first 6 months following diagnosis and their experience with their employers' programmes and policies. One hundred and ten gynaecological cancer survivors who were working at the time of their cancer diagnosis completed a survey. Case record reviews documented their clinical characteristics and treatment details. Ninety-five women (86%) had surgery; 81 (74%) received chemotherapy, radiotherapy or both in addition to surgery. Nine per cent of women said that they changed their treatment plan because of their jobs; in contrast, 62% of women said that they changed their work situation to accommodate their treatment plan. Overall, the most common month for women to stop working was Month 1 (41%), to decrease hours was Month 2 (32%) and to increase hours was Month 6 (8%). Twenty-eight per cent of women were aware of employer policies that assisted the return to work process; 70% of women were familiar with the Family and Medical Leave Act (FMLA) and 56% with the Americans with Disabilities Act (ADA). Only 26% completed a formal request for work accommodations. After 6 months, 56 of 83 women (67%) remained working or had returned to work. Work patterns varied for these gynaecological cancer survivors over the first 6 months following diagnosis. Opportunities exist to improve communication about work and treatment expectations between cancer survivors, occupational health professionals, employers and treating clinicians.
An Inventory of Documents on Educational Planning and Management in Asia and the Pacific.
ERIC Educational Resources Information Center
Mellor, Warren L., Ed.
This document comprises a UNESCO-sponsored inventory of documents on educational planning and management in Asia and the Pacific. The database consists of 714 documents from participating countries, divided into 10 subsections by country and indexed according to author and subject. The main entries are grouped alphabetically by country, as…
Detailed Design Documentation, without the Pain
NASA Astrophysics Data System (ADS)
Ramsay, C. D.; Parkes, S.
2004-06-01
Producing detailed forms of design documentation, such as pseudocode and structured flowcharts, to describe the procedures of a software system:(1) allows software developers to model and discuss their understanding of a problem and the design of a solution free from the syntax of a programming language,(2) facilitates deeper involvement of non-technical stakeholders, such as the customer or project managers, whose influence ensures the quality, correctness and timeliness of the resulting system,(3) forms comprehensive documentation of the system for its future maintenance, reuse and/or redeployment.However, such forms of documentation require effort to create and maintain.This paper describes a software tool which is currently being developed within the Space Systems Research Group at the University of Dundee which aims to improve the utility of, and the incentive for, creating detailed design documentation for the procedures of a software system. The rationale for creating such a tool is briefly discussed, followed by a description of the tool itself, a summary of its perceived benefits, and plans for future work.
FY 1986 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less
Description of a Website Resource for Turbulence Modeling Verification and Validation
NASA Technical Reports Server (NTRS)
Rumsey, Christopher L.; Smith, Brian R.; Huang, George P.
2010-01-01
The activities of the Turbulence Model Benchmarking Working Group - which is a subcommittee of the American Institute of Aeronautics and Astronautics (AIAA) Fluid Dynamics Technical Committee - are described. The group s main purpose is to establish a web-based repository for Reynolds-averaged Navier-Stokes turbulence model documentation, including verification and validation cases. This turbulence modeling resource has been established based on feedback from a survey on what is needed to achieve consistency and repeatability in turbulence model implementation and usage, and to document and disseminate information on new turbulence models or improvements to existing models. The various components of the website are described in detail: description of turbulence models, turbulence model readiness rating system, verification cases, validation cases, validation databases, and turbulence manufactured solutions. An outline of future plans of the working group is also provided.
Kearns, Randy D; Cairns, Bruce A; Hickerson, William L; Holmes, James H
2014-01-01
The Southern Region of the American Burn Association began to craft a regional plan to address a surge of burn-injured patients after a mass casualty event in 2004. Published in 2006, this plan has been tested through modeling, exercise, and actual events. This article focuses on the process of how the plan was created, how it was tested, and how it interfaces with other ongoing efforts on preparedness. One key to success regarding how people respond to a disaster can be traced to preexisting relationships and collaborations. These activities would include training or working together and building trust long before the crisis. Knowing who you can call and rely on when you need help, within the context of your plan, can be pivotal in successfully managing a disaster. This article describes how a coalition of burn center leaders came together. Their ongoing personal association has facilitated the development of planning activities and has kept the process dynamic. This article also includes several of the building blocks for developing a plan from creation to composition, implementation, and testing. The plan discussed here is an example of linking leadership, relationships, process, and documentation together. On the basis of these experiences, the authors believe these elements are present in other regions. The intent of this work is to share an experience and to offer it as a guide to aid others in their regional burn disaster planning efforts.
Santa Barbara City College: 1999-02 College Plan.
ERIC Educational Resources Information Center
Santa Barbara City Coll., CA.
This document presents Santa Barbara City College's 1999-2002 College Plan. It is intended to be used as the central organizing document for decision making, planning, and budgeting throughout the College during the 1999-2002 period. This plan is the result of thoughtful and substantive dialogue involving individuals and groups throughout the…
El Camino College Master Plan.
ERIC Educational Resources Information Center
El Camino Coll., Torrance, CA.
This document is the educational Master Plan for El Camino Community College District. The purpose of the plan is to develop a research-based document that will be used as a foundation for decisions regarding instructional programs, support services, staffing and facilities. It is intended to serve as the basic foundation for all other plans of…
Care plans and care planning in long term conditions: a conceptual model
Burt, J; Rick, J; Blakeman, T; Protheroe, J; Roland, M; Bower, P
2013-01-01
The prevalence and impact of long term conditions continues to rise. Care planning for people with long term conditions has been a policy priority for chronic disease management in a number of health care systems. However, patients and providers appear unclear about the formulation and implementation of care planning. Further work in this area is therefore required to inform the development, implementation and evaluation of future care planning initiatives. We distinguish between ‘care planning’ (the process by which health care professionals and patients discuss, agree and review an action plan to achieve the goals or behaviour change of most relevance and concern to the patient) and a ‘care plan’ (a written document recording the outcome of a care planning process). We propose a typology of care planning and care plans with three core dimensions: perspective (patient or professional), scope (a focus on goals or on behaviours) and networks (confined to the professional-patient dyad or extending to the entire care network). In addition, we draw on psychological models of mediation and moderation to outline potential mechanisms through which care planning and care plans may lead to improved outcomes for both patients and the wider health care system. The proposed typology of care planning and care plans offered here, along with the model of the process by which care planning may influence outcomes, provide a useful framework for future policy developments and evaluations. Empirical work is required to explore the degree to which current care planning approaches and care plans can be described according to these dimensions, and the factors that determine which types of patients and professionals use which type of care plans. PMID:23883621
DOT National Transportation Integrated Search
2001-10-01
This document is the third in a series of five that present the sequential results of the Thurston Regional Planning Council (TRPC) Regional Intelligent Transportation Systems (ITS) : Planning Project. This document presents an ITS Strategic Depl...
Airport Surface Traffic Control Visual Ground Aids Engineering and Development Plan
DOT National Transportation Integrated Search
1977-01-01
The plan described in this document supports the overall program at the Transportation Systems Center to define, design, develop, and evaluate systems that meet the requirements of airport surface traffic control. This plan is part of documentation s...
a Case Study in Documentation Production as Learning Tools Benefitting Multiple Stakeholders
NASA Astrophysics Data System (ADS)
Truesdale, T. J.; Hierlihy, B.; Jouan, P.
2017-08-01
The Fondation Strutt Foundation has taken on the conservation planning of the Strutt House as part of a P3 collaborative effort with the National Capital Commission (NCC). This paper will address three of the primary documents/data sets (documentary methodologies) being used on/for the Strutt House project. The Strutt House is a Recognized Federal Heritage Building and a significant example of Canadian modernist architecture. Stakeholder is a term often used in Architectural Projects reflecting an economic interest in success of the project. In conservation projects the stakeholder generally reflects social, cultural and/or economic interests in a given project. The Strutt House project has benefitted from stakeholders that have all been interested in the above, as well as the education of our future conservationists. The Strutt house was purchased from the architect's daughter in 2010, and as part of the acquisition, a Heritage Structure Report was commissioned and produced by PTAH Consultants Inc., Architects. The report forms the first of the primary referenced documents of this paper, including: a comprehensive photographic record of existing conditions; and, a building simulation model of the house `as designed/built'. This HSR and the accompanying data/documents have been adopted as the basis of an evolving document in the development of the Conservation Plan including: additional heritage surveys and technologies; traditional drawings, photographic and video records; and, a series of workshops on the structural stabilization efforts, thermography scans, and smoke/blow-door (air pressure) testing. In 2016, Pierre Jouan, a Master's thesis student from KU Leuvan, working with the Carleton University CIMS lab under the direction of Professor Mario Santana, and the FSF completed a 3-D scanning and photogrammetry workshop on the Strutt House and created a building information model (BIM model) from the collected data. The three primary documentation processes being addressed in this paper are really a series of directed research or focussed investigations resulting in a collection of data sets resolved -or combined- into a document. They will assist in the development of the long-term Programming and Conservation Management Plan of the Strutt House.
Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1994.
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority
1994-02-01
This document is part of Bonneville Power Administration`s program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. The Fiscal Year 1994 (FY 1994) Annual Implementation Work Plan (AIWP) presents Bonneville Power Administration`s (BPA`s) plan for implementation of the Columbia River Basin Fish and Wildlife Program (Program). The purpose of the Program is to guide BPA and other federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife in the Columbia River Basin. Phase I began the work of salmonmore » recovery with certain fast-track measures completed in August 1991. Phase II dealt with Snake and Columbia river flow and salmon harvest and was completed in December 1991. Phase III dealt with system-wide habitat and salmon production issues and was completed in September 1992. Phase IV planning, focusing on resident fish and wildlife, began in August 1993, and was finished and adopted in November 1993. This report provides summaries of the ongoing and new projects for FY 1994 within the areas of juvenile migration, adult migration, salmon harvest, production and habitat, coordinated implementation, monitoring and evaluation, resident fish, and wildlife.« less
Management of medical technology: case study of a major acute hospital.
Brown, Ian; Smale, Andrew
2007-01-01
This paper presents results of a Capital Equipment Management Plan undertaken at a major acute hospital in Australia. By classifying existing equipment using a threshold replacement value into Major and Minor items, detailed planning information was collected for 527 items of Major equipment representing 80% of the hospital's total equipment stock. A number of meaningful views of this significant asset base are presented, and a prioritisation method used to provide recommendations for future equipment replacement and acquisition for a 5 year planning period. The survey work to identify and document actual equipment items provides a convincing argument for the funding levels required for capital equipment replacement and acquisition, and evidence for the extent of technology reliance in modern health care facilities.
Drabek, T E
1992-06-01
Data obtained from 65 executives working for tourism firms in three sample communities permitted comparison with the public warning response literature regarding three topics: disaster evacuation planning, initial warning responses, and disaster evacuation behavior. Disaster evacuation planning was reported by nearly all of these business executives, although it was highly variable in content, completeness, and formality. Managerial responses to post-disaster warnings paralleled the type of complex social processes that have been documented within the public response literature, except that warning sources and confirmation behavior were significantly affected by contact with authorities. Five key areas of difference were discovered in disaster evacuation behavior pertaining to: influence of planning, firm versus family priorities, shelter selection, looting concerns, and media contacts.
High priority needs for range-wide monitoring of North American landbirds
Dunn, Erica H.; Altman, B.L.; Bart, J.; Beardmore, C.J.; Berlanga, H.; Blancher, P.J.; Butcher, G.S.; Demarest, D.W.; Dettmers, R.; Hunter, W.C.; Iñigo-Elias, Eduardo E.; Panjabi, A.O.; Pashley, D.N.; Ralph, C.J.; Rich, T.D.; Rosenberg, K.V.; Rustay, C.M.; Ruth, J.M.; Will, T.C.
2005-01-01
This document is an extension of work done for the Partners in Flight North American Landbird Conservation Plan (Rich et al. 2004). The Continental Plan reviewed conservation status of the 448 native landbird species that regularly breed in the United States and Canada. Two groups of species were identified as having high conservation importance: the PIF Watch List, made up of species for which there is conservation concern, and Stewardship Spices that are particularly characteristic of regional avifaunas. In addition, continental scale monitoring needs were identified for all species. Here we extend the monitoring needs aspect of the Plan, providing additional detail and suggesting the best means of filling the gaps in broad-scale, long-term trend monitoring. This analysis and report was compiled by the Partners in Flight (PIF) Science Committee as a contribution to current work by the North American Bird Conservation Initiative to assess the status of bird population monitoring in North America and to make recommendations for improvements.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Humphrey, Betty; Bland, Jesse John
This paper documents the history of the TRU program at Sandia, previous and current activities associated with TRU material and waste, interfaces with other TRU waste generator sites and the Waste Isolation Pilot Plan (WIPP), and paths forward for TRU material and waste. This document is a snapshot in time of the TRU program and should be updated as necessary, or when significant changes have occurred in the Sandia TRU program or in the TRU regulatory environment. This paper should serve as a roadmap to capture past TRU work so that efforts are not repeated and ground is not lostmore » due to future inactivity and personnel changes.« less
Mars power system concept definition study. Volume 2: Appendices
NASA Technical Reports Server (NTRS)
Littman, Franklin D.
1994-01-01
This report documents the work performed by Rockwell International's Rocketdyne Division on NASA Contract No. NAS3-25808 (Task Order No. 16) entitled 'Mars Power System Definition Study'. This work was performed for NASA's Lewis Research Center (LeRC). The report is divided into two volumes as follows: Volume 1 - Study Results; and Volume 2 - Appendices. The results of the power system characterization studies, operations studies, and technology evaluations are summarized in Volume 1. The appendices include complete, standalone technology development plans for each candidate power system that was investigated.
ERIC Educational Resources Information Center
Christenson, Leo G., Comp.; Mercer, John W., Comp.
This document contains task force findings and recommendations regarding development of a statewide plan for facilitating education and employment transitions (EET) of youths and adults throughout Minnesota. Chapter 1 presents a rationale for a statewide EET system in the context of the employment/earnings patterns of Minnesota youths and adults,…
NASA Technical Reports Server (NTRS)
Wigley, D. A.
1985-01-01
Interrelated research and development activities, phased development of stepped specimen program are documented and a sequence for a specific program of machining, validation and heat treatment cycles for one material are described. Proposed work for the next phase of dimensional stability research is presented and further technology development activities are proposed.
Code of Federal Regulations, 2010 CFR
2010-01-01
... RRH, RCH, and LH Proposals C Exhibit C to Subpart C of Part 1924 Agriculture Regulations of the... REPAIR Planning and Performing Site Development Work Pt. 1924, Subpt. C, Exh. C Exhibit C to Subpart C of... the required information will be sufficient. C. Property Survey Map. A current survey map of the...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-11
... States. New Jersey's SIP is in two parts: Reasonable Progress and application of Best Available Retrofit... view the hard copy of the docket. You may view the hard copy of the docket Monday through Friday, 8 a.m... working together through MANE-VU. \\1\\ On June 20, 2007, MANE-VU adopted two documents which provide the...
DOT National Transportation Integrated Search
2003-09-22
This document presents the Evaluation Teams plan for conducting the evaluation of the FOT in Washington State. A companion document exists for the evaluation of the Utah deployment. This plan includes the experimental design for testing hypotheses...
PS1-20: VDW Operational Committee: Current Activities and Future Directions
Brown, Jeffrey; McDonald, Sarah; Moore, Kristen; Saylor, Gwyn; Hart, Gene; Hornbrook, Mark; Magid, David; Go, Alan
2010-01-01
Background/Aims: The Virtual Data Warehouse (VDW) is the HMO Research Network (HMORN) approach for facilitating multisite research while protecting the privacy of members and proprietary corporate information. A valid and sustainable VDW is critical to the success of the HMORN, and is needed for HMORN’s inclusion in many of the most important public health initiatives planned for the next few years. Methods: In November 2007 the HMORN Governing Board approved the VDW 5-Year Strategic Plan, including creation of a VDW Operational Committee (VOC), reporting to the Assets Stewardship Committee (ASC) and providing coordinated oversight of the development, maintenance, and enhancement of the VDW. The seven members of the VOC are investigators and analysts representing HMORN’s major consortia projects: CERT, CVRN and CRN. Results: In 2008, the VOC accomplished two major short term goals: Creation of a comprehensive data quality checking system, implemented by seven content area expert Working Groups (WGs) consisting of 23 investigators and 23 programmer\\analysts. The content areas of the WGs are enrollment and demographics, pharmacy, utilization, tumor, vital signs, laboratory, and census. The WGs assessed data availability and completeness for their content area and reported findings to the VOC and ASC, including recommendations for changes and enhancements. WG reports will form the basis for ongoing VDW documentation that will be used to standardize HMORN VDW descriptions for grants and proposals; Development of a budget, staffing plan and priorities for 2009. The 2009 priorities include development of VOC standard operating procedures for creating new data content areas and changing current data areas/definitions, documenting policies for use of the VDW, promoting use of the VDW, and creation of additional WGs for death (new VDW content area), informatics, implementation, and data documentation. The documentation WG will oversee issues such as data dictionaries, data checking documentation, programming resources, a clinical concepts library, user guides, and incorporating updated VDW information in the HMORN Collaboration Toolkit. Looking forward, the VDW 5-year Strategic Plan includes streamlining IRB approval for multisite research and enhancing HMORN informatics capabilities. Conclusions: The newly created VOC has made substantial progress in helping make the HMORN VDW an even more valuable and useful resource for the network.
ENGINEERED BARRIER SYSTEM: PHYSICAL AND CHEMICAL ENVIRONMENT
DOE Office of Scientific and Technical Information (OSTI.GOV)
R. Jarek
2005-08-29
The purpose of this model report is to describe the evolution of the physical and chemical environmental conditions within the waste emplacement drifts of the repository, including the drip shield and waste package surfaces. The resulting seepage evaporation and gas abstraction models are used in the total system performance assessment for the license application (TSPA-LA) to assess the performance of the engineered barrier system and the waste form. This report develops and documents a set of abstraction-level models that describe the engineered barrier system physical and chemical environment. Where possible, these models use information directly from other reports as input,more » which promotes integration among process models used for TSPA-LA. Specific tasks and activities of modeling the physical and chemical environment are included in ''Technical Work Plan for: Near-Field Environment and Transport In-Drift Geochemistry Model Report Integration'' (BSC 2005 [DIRS 173782], Section 1.2.2). As described in the technical work plan, the development of this report is coordinated with the development of other engineered barrier system reports. To be consistent with other project documents that address features, events, and processes (FEPs), Table 6.14.1 of the current report includes updates to FEP numbers and FEP subjects for two FEPs identified in the technical work plan (TWP) governing this report (BSC 2005 [DIRS 173782]). FEP 2.1.09.06.0A (Reduction-oxidation potential in EBS), as listed in Table 2 of the TWP (BSC 2005 [DIRS 173782]), has been updated in the current report to FEP 2.1.09.06.0B (Reduction-oxidation potential in Drifts; see Table 6.14-1). FEP 2.1.09.07.0A (Reaction kinetics in EBS), as listed in Table 2 of the TWP (BSC 2005 [DIRS 173782]), has been updated in the current report to FEP 2.1.09.07.0B (Reaction kinetics in Drifts; see Table 6.14-1). These deviations from the TWP are justified because they improve integration with FEPs documents. The updates have no impact on the model developed in this report.« less
NASA Technical Reports Server (NTRS)
Tuey, Richard C.; Collins, Mary; Caswell, Pamela; Haynes, Bob; Nelson, Michael L.; Holm, Jeanne; Buquo, Lynn; Tingle, Annette; Cooper, Bill; Stiltner, Roy
1996-01-01
This evaluation report contains an introduction, seven chapters, and five appendices. The Introduction describes the purpose, conceptual framework, functional description, and technical report server of the Scientific and Technical Information (STI) Electronic Document Distribution (EDD) project. Chapter 1 documents the results of the prototype STI EDD in actual operation. Chapter 2 documents each NASA center's post processing publication processes. Chapter 3 documents each center's STI software, hardware. and communications configurations. Chapter 7 documents STI EDD policy, practices, and procedures. The appendices consist of (A) the STI EDD Project Plan, (B) Team members, (C) Phasing Schedules, (D) Accessing On-line Reports, and (E) Creating an HTML File and Setting Up an xTRS. In summary, Stage 4 of the NASAwide Electronic Publishing System is the final phase of its implementation through the prototyping and gradual integration of each NASA center's electronic printing systems, desk top publishing systems, and technical report servers, to be able to provide to NASA's engineers, researchers, scientists, and external users, the widest practicable and appropriate dissemination of information concerning its activities and the result thereof to their work stations.
Creating a University for the 21st Century: Strategic Plan
ERIC Educational Resources Information Center
North Dakota University System, 2005
2005-01-01
This document presents the strategic plan of the North Dakota University System, revised in November 2005, to develop a common vision and clear set of expectations for higher education in North Dakota. The strategic plan for the University System is directly linked to the Roundtable on Higher Education plan. This document presents the ten sections…
Defense.gov Special Report: Government Shutdown - What You Need to Know
Department is taking to plan for a possible government shutdown. Document Plan for Agency Operations During agencies should plan for a potential shutdown. Document Guidance for Continuation of Operations in The Contingency Plan Guidance for Continuation of Essential Operations in the Absence of Available Appropriations
Solid waste information and tracking system server conversion project management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
MAY, D.L.
1999-04-12
The Project Management Plan governing the conversion of Solid Waste Information and Tracking System (SWITS) to a client-server architecture. The Solid Waste Information and Tracking System Project Management Plan (PMP) describes the background, planning and management of the SWITS conversion. Requirements and specification documentation needed for the SWITS conversion will be released as supporting documents.
Becker, CoraLynn; Bjornson, Darrel C; Kuhle, Julie W
2004-01-01
To document drug therapy problems and their causes and assess pharmacist follow-up of patients with identified drug therapy problems. Cross-sectional analysis. Iowa. 160 pharmacists who submitted 754 pharmaceutical care plans in an effort to qualify for participation in the Iowa Pharmaceutical Case Management program. Care plans were assessed for drug therapy problems and causes and for documentation of pharmacist follow-up (actual, none, or intent to follow up). Pharmacists documented a wide variety of drug therapy problems and causes, including adverse drug reactions (20.1% of care plans), need for additional drug therapy (18.9%), lack of patient adherence to therapy (16.3%), incorrect medication being prescribed (14.1%), and drug dose too high (10.0%). Pharmacist follow-up with patients was not optimal, with 31% of care plans providing documentation of actual follow-up. Another 42.2% of plans indicated that the pharmacist intended to contact the patient for follow-up but either did not do so or did not record the intervention. No actual follow-up or intent to follow up was recorded in 26.8% of care plans. Pharmacists practicing in independent pharmacies followed up with patients more frequently than those in other settings (36.4% of care plans, compared with 22.7%, 23.2%, and 28.4% for chain, clinic, and franchise pharmacies). Pharmacists were more likely to follow up when the identified problem involved drug safety rather than effectiveness (36.2% versus 28.3% of care plans). Documentation of pharmacist follow-up with patients was less than optimal. In addition to identifying drug therapy problems and causes, pharmacists must complete the care continuum through documentation of patient monitoring and follow-up to transform the philosophy and vision of the pharmaceutical care concept into a practice of pharmacy recognized and rewarded by patients and payers.
DOT National Transportation Integrated Search
1996-08-01
The purpose of this document is to provide trustees with general guidance to develop restoration plans under OPA that comply with NEPA's procedural requirements. The focus of this document is to more fully describe the processes and products required...
Durand, Marie-José; Corbière, Marc; Coutu, Marie-France; Reinharz, Daniel; Albert, Valérie
2014-01-01
Workplace absenteeism is still a curse for developed countries, and more systematic practices need to be adopted to address this issue. To review the literature on best practices for managing work absences related to musculoskeletal or common mental disorders. A review was conducted by performing a search in bibliographic databases and on work-disability research institute websites. Recommendations regarding work-absence management and return-to-work practices were extracted from all the retained documents and organized within a chronological framework. In total, 17 documents were analyzed, leading to identification of common work-absence management and return-to-work practices, the importance of a worker support approach, and recommended roles and responsibilities for stakeholders. These practices were then integrated into a six-step process: (1) time off and recovery period; (2) initial contact with the worker; (3) evaluation of the worker and his job tasks; (4) development of a return-to-work plan with accommodations; (5) work resumption, and (6) follow-up of the return-to-work process. Based on this review, we constructed a comprehensive work-absence management and return-to-work process designed to assist organizations. Our results indicate that such a process must be included within a broader policy of health promotion and job retention. Adaptations will be required for implementation in the workplace.
Data management and processing plan, Department of Applied Geodesy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-08-01
This plan outlines Data Management and Data Processing requirements of the Department of Applied Geodesy (DAG) and presents the plan to meet these requirements (These requirements are derived from the functional needs of the Department to meet the SSCL alignment tolerances and schedules). In addition, this document presents a schedule for the implementation of this plan. This document is an integral part of the Alignment Plan of the SSCL.
Integration of safety engineering into a cost optimized development program.
NASA Technical Reports Server (NTRS)
Ball, L. W.
1972-01-01
A six-segment management model is presented, each segment of which represents a major area in a new product development program. The first segment of the model covers integration of specialist engineers into 'systems requirement definition' or the system engineering documentation process. The second covers preparation of five basic types of 'development program plans.' The third segment covers integration of system requirements, scheduling, and funding of specialist engineering activities into 'work breakdown structures,' 'cost accounts,' and 'work packages.' The fourth covers 'requirement communication' by line organizations. The fifth covers 'performance measurement' based on work package data. The sixth covers 'baseline requirements achievement tracking.'
Preschool Teachers' Perspectives on Planning and Documentation in Preschool
ERIC Educational Resources Information Center
Alvestad, Torgeir; Sheridan, Sonja
2015-01-01
This article is based on a research project focusing on Norwegian teachers' planning and documentation of children's learning in preschool. Norwegian preschools follow a national curriculum and teachers are obliged to document both professional practice and learning outcomes. The aim of the article is to investigate teachers' experiences of…
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-07-01
This document contains comments made by the US Nuclear Regulatory Commission upon their review of the Long-Term Surveillance Plan for the Bodo Canyon Disposal Site, Durango, Colorado. Responses to the comments are also included in the document.
Draft Updates to the Planning for Natural Disaster Debris Guidance and to Related Documents
EPA is requesting comment on the draft update of the Planning for Natural Disaster Debris Guidance, along with two other documents. This Guidance is an update of the Planning for Natural Disaster Debris guidance that EPA published in March 2008.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Standardization Information System (ASSIST), and Plans, Drawings, and Other Pertinent Documents. Availability of... Information System (ASSIST), and Plans, Drawings, and Other Pertinent Documents. Availability of... Streamlining and Standardization Information System (ASSIST), and Plans, Drawings, and Other Pertinent...
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration.
1981-01-01
The Pacific Northwest Electric Power Planning and Conservation Act became effective when it was signed into law by President Carter on December 5, 1980. This ended a four-year debate over legislation designed to plan and coordinate the region's energy future. This legislative history is an abbreviated version taken from the larger historical file maintained by the BPA Law Library. It is intended to assist BPA personnel and others who are studying the Northwest Power Act and working on its implementation. The documents included were selected for their value in determining what Congress meant in enacting the statute and to providemore » the researcher with a starting point for further investigation. These documents include: a history of the Act, a chronology of the legislative action leading to passage of the law; a section-by-section analysis of the Act; the Congressional Records of Senate and House debates on the bill and its amendments, and a list of Congressional committee hearings.« less
Repository-based software engineering program: Concept document
NASA Technical Reports Server (NTRS)
1992-01-01
This document provides the context for Repository-Based Software Engineering's (RBSE's) evolving functional and operational product requirements, and it is the parent document for development of detailed technical and management plans. When furnished, requirements documents will serve as the governing RBSE product specification. The RBSE Program Management Plan will define resources, schedules, and technical and organizational approaches to fulfilling the goals and objectives of this concept. The purpose of this document is to provide a concise overview of RBSE, describe the rationale for the RBSE Program, and define a clear, common vision for RBSE team members and customers. The document also provides the foundation for developing RBSE user and system requirements and a corresponding Program Management Plan. The concept is used to express the program mission to RBSE users and managers and to provide an exhibit for community review.
The Cancer Nanotechnology Plan serves as a strategic document to the NCI Alliance for Nanotechnology in Cancer as well as a guiding document to the cancer nanotechnology and oncology fields, as a whole.
Guldbrandsson, Karin; Wennerstad, Karin Modig; Rasmussen, Finn
2009-08-03
Promoting physical activity and healthy eating habits by structural measures that reach most children in a society is presumably the most sustainable way of preventing development of overweight and obesity in childhood. The main purpose of the present study was to analyse whether policies and plans of action at the central level in municipalities increased the number of measures that aim to promote physical activity and healthy eating habits among schoolchildren aged six to 16. Another purpose was to analyse whether demographic and socio-economic characteristics were associated with the level of such measures. Questionnaires were used to collect data from 25 municipalities and 18 town districts in Stockholm County, Sweden. The questions were developed to capture municipal structural work and factors facilitating physical activity and the development of healthy eating habits for children. Local policy documents and plans of action were gathered. Information regarding municipal demographic and socio-economic characteristics was collected from public statistics. Policy documents and plans of action in municipalities and town districts did not seem to influence the number of measures aiming to promote physical activity and healthy eating habits among schoolchildren in Stockholm County. Municipal demographic and socio-economic characteristics were, however, shown to influence the number of measures. In town districts with a high total population size, and in municipalities and town districts with a high proportion of adults with more than 12 years of education, a higher level of health-promoting measures was found. In municipalities with a high annual population growth, the number of measures was lower than in municipalities with a lower annual population growth. Another key finding was the lack of agreement between what was reported in the questionnaires regarding existence and contents of local policies and plans of action and what was actually found when these documents were scrutinized. Policy documents and plans of action aiming to promote physical activity and healthy eating habits among schoolchildren aged six to 16 in municipalities and town districts in Stockholm County did not seem to have an impact on the local level of measures. Demographic and socio-economic characteristics of the municipalities and town districts were on the other hand associated with local health-promoting measures.
Recommendations for UAS Crew Ratings. Pilot Ratings and Authorization Requirements for UAS
NASA Technical Reports Server (NTRS)
2005-01-01
This position paper is intended to recommend the minimum certificate and rating requirements for a pilot to operate an Unmanned Aircraft System (UAS) in the National Airspace System. The paper will recommend the minimum requirements based on the Knowledge, Skills, and Abilities (KSA) required of a UAS pilot and show how those compare to the KSAs required by regulation for manned-aircraft pilots. The paper will provide substantiation based on studies conducted using analyses, simulation and flight experience. The paper is not yet complete; only initial working material is included. The material provided describes the body of work completed thus far and the plan for remaining tasks to complete the recommendation. The HSI Pilot KSA document provides an analysis of the knowledge, skills, and abilities required for UAS operation in the NAS. It is the source document used for the position paper.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matuszak, M; Anderson, C; Lee, C
Purpose: With electronic medical records, patient information for the treatment planning process has become disseminated across multiple applications with limited quality control and many associated failure modes. We present the development of a single application with a centralized database to manage the planning process. Methods: The system was designed to replace current functionalities of (i) static directives representing the physician intent for the prescription and planning goals, localization information for delivery, and other information, (ii) planning objective reports, (iii) localization and image guidance documents and (iv) the official radiation therapy prescription in the medical record. Using the Eclipse Scripting Applicationmore » Programming Interface, a plug-in script with an associated domain-specific SQL Server database was created to manage the information in (i)–(iv). The system’s user interface and database were designed by a team of physicians, clinical physicists, database experts, and software engineers to ensure usability and robustness for clinical use. Results: The resulting system has been fully integrated within the TPS via a custom script and database. Planning scenario templates, version control, approvals, and logic-based quality control allow this system to fully track and document the planning process as well as physician approval of tradeoffs while improving the consistency of the data. Multiple plans and prescriptions are supported along with non-traditional dose objectives and evaluation such as biologically corrected models, composite dose limits, and management of localization goals. User-specific custom views were developed for the attending physician review, physicist plan checks, treating therapists, and peer review in chart rounds. Conclusion: A method was developed to maintain cohesive information throughout the planning process within one integrated system by using a custom treatment planning management application that interfaces directly with the TPS. Future work includes quantifying the improvements in quality, safety and efficiency that are possible with the routine clinical use of this system. Supported in part by NIH-P01-CA-059827.« less
78 FR 14556 - Proposed Information Collection Activity; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-06
... for ACF. OMB No.: 0992-0005. Description: The Advance Planning Document (APD) process, established in... Biennial Reports 54 1 1.50 81 Advance Planning Document 34 1.2 120 4,896 Operational Advance Planning... for the proper performance of the functions of the agency, including whether the information shall...
Missouri Comprehensive Outdoor Recreation Plan: Executive Summary.
ERIC Educational Resources Information Center
Missouri State Inter-Agency for Outdoor Recreation, Jefferson.
The document is a summary of the Missouri State Comprehensive Outdoor Recreation Plan, which was designed to provide guidelines for allocation of resources for needed recreation facilities. The plan identifies the present and future needs for outdoor recreation and recommends ways of meeting these needs. This 1967 document provides a brief history…
42 CFR 495.324 - Prior approval conditions.
Code of Federal Regulations, 2010 CFR
2010-10-01
...: (1) The HIT advance planning document and the implementation advance planning document. (2) A request... $100,000 or contract time extensions of more than 60 days. (4) The State Medicaid HIT plan. (c) Failure...-competitively from a nongovernmental source HIT equipment or services, with proposed FFP under this subpart if...
EPA is requesting comment on the draft Planning for Natural Disaster Debris Guidance, and two other documents. The Guidance is an update of the Planning for Natural Disaster Debris guidance that EPA published in March 2008.
The road to worldwide sexuality education.
Edwards, M
1997-01-01
The articles in this "SIECUS Report" document the organization's involvement in the development of sexuality education programs around the world. Topics covered by the articles in this issue include efforts by the Bolivian Government to increase understanding and acceptance of family planning methods, work with the Soros Foundation to train teachers to teach health education, a sexuality education pilot project in Russia, development of a culturally sensitive sex education program in Indonesia, and life education for youth in India. In the year ahead, SIECUS will implement country-specific programs in Nigeria, Swaziland, Russia, and India aimed at establishing frameworks for reproductive health, family planning, acquired immunodeficiency syndrome prevention, and population education programs.
Transuranic Waste Test Facility Development Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Looper, M.G.
1987-05-05
This letter discusses the development and test program planned for the Transuranic Waste Test Facility (TWTF). The planned effort is based on previous work in the ADandD Pilot Facility and testing of TWTF equipment before installation. Input from Waste Management and AED Fairview is included. The program will focus on the following areas: Retrieval; Material Handling; Size Reduction; Operation and Maintenance. The program will take 1-1/2 to 2 years to complete and began in December 1986. Technical Data Summaries (TDS) and basic data reports will be issued periodically to document results and provide basic data for the Transuranic Waste Facilitymore » (TWF). 2 refs., 2 figs.« less
Waters, Peter M
2015-01-01
The continuing increases in health care expenditures as well as the importance of providing safe, effective, timely, patient-centered care has brought government and commercial payer pressure on hospitals and providers to document the value of the care they deliver. This article introduces work at Boston Children's Hospital on time-driven activity-based accounting to determine cost of care delivery; combined with Systemic Clinical Assessment and Management Plans to reduce variation and improve outcomes. The focus so far has been on distal radius fracture care for children and adolescents.
Guidance and Control Software Project Data - Volume 1: Planning Documents
NASA Technical Reports Server (NTRS)
Hayhurst, Kelly J. (Editor)
2008-01-01
The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the planning documents from the GCS project. Volume 1 contains five appendices: A. Plan for Software Aspects of Certification for the Guidance and Control Software Project; B. Software Development Standards for the Guidance and Control Software Project; C. Software Verification Plan for the Guidance and Control Software Project; D. Software Configuration Management Plan for the Guidance and Control Software Project; and E. Software Quality Assurance Activities.
This document summarizes the public and external peer review comments that the EPA’s Office of Pollution Prevention and Toxics (OPPT) received for the draft work plan risk assessment for 1,3,4,6,7,8-Hexahydro-4,6,6,7,8,8-hexamethylcyclopenta--2-benzopyran
ERIC Educational Resources Information Center
Jones, Peter
This self-instructional unit for supervisors and managers in the British hotel and catering industry is intended to consolidate work covered in a 1-day course. The document begins with an introduction and advice on how to use the unit. The following topics are covered in the unit: (1) planning the menu; (2) food production systems; (3) kitchen…
Psychometric Testing of the Self-Efficacy for Interdisciplinary Plans of Care Scale.
Molle, Elizabeth; Froman, Robin
2017-01-01
Computerized interdisciplinary plans of care have revitalized nurse-centric care plans into dynamic and meaningful electronic documents. To maximize the benefits of these documents, it is important to understand healthcare professionals' attitudes, specifically their confidence, for making computerized interdisciplinary care plans useful and meaningful documents. The purpose of the study was to test the psychometric properties of the Self-Efficacy for Interdisciplinary Plans of Care instrument intended to measure healthcare professionals' self-efficacy for using such documents. Content validity was assessed by an expert review panel. Content validity indices ranged from 0.75 to 1.00, with a scale CVI of 0.94. A sample of 389 healthcare providers completed the 14-item instrument. Principal axis factoring was used to assess factor structure. The exploratory factor analysis yielded a single-factor structure accounting for 71.76% of covariance. Cronbach internal consistency coefficient for the single factor solution was .97. The corrected item-total correlations ranged from 0.71 to 0.90. The coefficient of stability, during a 2-week period, with a subset of the sample (n = 38), was estimated at 0.82. The results of this study suggest that the Self-Efficacy for Interdisciplinary Plans of Care has sturdy reliability and validity for measuring the self-efficacy of healthcare providers to make computerized interdisciplinary plans of care meaningful and useful documents.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Draeger, Erik W.
This report documents the fact that the work in creating a strategic plan and beginning customer engagements has been completed. The description of milestone is: The newly formed advanced architecture and portability specialists (AAPS) team will develop a strategic plan to meet the goals of 1) sharing knowledge and experience with code teams to ensure that ASC codes run well on new architectures, and 2) supplying skilled computational scientists to put the strategy into practice. The plan will be delivered to ASC management in the first quarter. By the fourth quarter, the team will identify their first customers within PEMmore » and IC, perform an initial assessment and scalability and performance bottleneck for next-generation architectures, and embed AAPS team members with customer code teams to assist with initial portability development within standalone kernels or proxy applications.« less
McWhirter, Ellen Hawley; Ramos, Karina; Medina, Cynthia
2013-07-01
Latina/o high school students without documentation face a challenging situation when they graduate from high school, with pathways to work and postsecondary education stymied by their immigration status. We examined the effects of anticipated barriers associated with immigration status, age, and sex on the dependent variables of vocational outcome expectations, anticipated external and internal barriers, and postsecondary schooling plans in a sample of 475 Latina/o high school students. Findings include that students anticipating immigration status problems had lower vocational outcome expectations and anticipated more external barriers to pursuing their postsecondary plans. Latina girls and older high school students anticipating immigration status problems were more likely to plan to attend 2-year rather than 4-year colleges, and less likely to plan on postsecondary education, respectively. Implications for practice, policy, and research are discussed. PsycINFO Database Record (c) 2013 APA, all rights reserved.
Magnuson, Matthew L; Satzger, R Duane; Alcaraz, Armando; Brewer, Jason; Fetterolf, Dean; Harper, Martin; Hrynchuk, Ronald; McNally, Mary F; Montgomery, Madeline; Nottingham, Eric; Peterson, James; Rickenbach, Michael; Seidel, Jimmy L; Wolnik, Karen
2012-05-01
Since the early 1990s, the FBI Laboratory has sponsored Scientific Working Groups to improve discipline practices and build consensus among the forensic community. The Scientific Working Group on the Forensic Analysis of Chemical, Biological, Radiological and Nuclear Terrorism developed guidance, contained in this document, on issues forensic laboratories encounter when accepting and analyzing unknown samples associated with chemical terrorism, including laboratory capabilities and analytical testing plans. In the context of forensic analysis of chemical terrorism, this guidance defines an unknown sample and addresses what constitutes definitive and tentative identification. Laboratory safety, reporting issues, and postreporting considerations are also discussed. Utilization of these guidelines, as part of planning for forensic analysis related to a chemical terrorism incident, may help avoid unfortunate consequences not only to the public but also to the laboratory personnel. 2011 American Academy of Forensic Sciences. Published 2011. This article is a U.S. Government work and is in the public domain in the U.S.A.
MSFC personnel management tasks: Recruitment and orientation of new employees
NASA Technical Reports Server (NTRS)
Brindley, T. A.
1980-01-01
In order to encourage highly motivated young students to learn about NASA and consider it for a career, a formal program is to be initiated whereby selected students can work on a voluntary basis at Marshall Space Flight Center (MSFC). The first task was to develop the working plan and procedures for this program, called Student Volunteer Service Program, in the writing of MSFC official guidelines, the Marshall Management Instruction (the MMI) which is a binding document that defines policy and establishes procedures and guidelines. Particular considerations written into the MMI after numerous consultations, interviews, and discussions about a satisfactory policy, include: arrangements to be made between the student, the school authorities, and concerned MSFC employees; management of the work assignments; and procedures for the student's welfare and safety. The second task was the development of a recruitment brochure for the attraction of new employees, especially scientists and engineers. The third task assigned was to develop a plan called Orientation of New Employees.
Lightning Protection System for HE Facilities at LLNL - Certification Template
DOE Office of Scientific and Technical Information (OSTI.GOV)
Clancy, T J; Ong, M M; Brown, C G
2005-12-08
This document is meant as a template to assist in the development of your own lighting certification process. Aside from this introduction and the mock representative name of the building (Building A), this document is nearly identical to a lightning certification report issued by the Engineering Directorate at Lawrence Livermore National Laboratory. At the date of this release, we have certified over 70 HE processing and storage cells at our Site 300 facilities. In Chapters 1 and 2 respectively, we address the need and methods of lightning certification for HE processing and storage facilities at LLNL. We present the preferredmore » method of lightning protection in Chapter 3, as well as the likely building modifications that are needed to comply with this method. In Chapter 4, we present the threat assessment and resulting safe work areas within a cell. After certification, there may be changes to operations during a lightning alert, and this is discussed in Chapter 5. Chapter 6 lists the maintenance requirements for the continuation of lighting certification status. Appendices of this document are meant as an aid in developing your own certification process, and they include a bonding list, an inventory of measurement equipment, surge suppressors in use at LLNL, an Integrated Work and Safety form (IWS), and a template certification sign-off sheet. The lightning certification process involves more that what is spelled out in this document. The first steps involve considerable planning, the securing of funds, and management and explosives safety buy-in. Permits must be obtained, measurement equipment must be assembled and tested, and engineers and technicians must be trained in their use. Cursory building inspections are also recommended, and surge suppression for power systems must be addressed. Upon completion of a certification report and its sign-off by management, additional work is required. Training will be needed in order to educate workers and facility managers of the requirements of lightning certification. Operating procedures will need to be generated and/or modified with additional controls. Engineering controls may also be implemented requiring the modification of cells. Careful planning should bring most of these issues to light, making it clear where this document is helpful and were additional assistance may be necessary.« less
10 CFR 850 Implementation of Requirements
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lee, S
2012-01-05
10 CFR 850 defines a contractor as any entity, including affiliated entities, such as a parent corporation, under contract with DOE, including a subcontractor at any tier, with responsibility for performing work at a DOE site in furtherance of a DOE mission. The Chronic Beryllium Disease Prevention Program (CBDPP) applies to beryllium-related activities that are performed at the Lawrence Livermore National Laboratory (LLNL). The CBDPP or Beryllium Safety Program is integrated into the LLNL Worker Safety and Health Program and, thus, implementation documents and responsibilities are integrated in various documents and organizational structures. Program development and management of the CBDPPmore » is delegated to the Environment, Safety and Health (ES&H) Directorate, Worker Safety and Health Functional Area. As per 10 CFR 850, Lawrence Livermore National Security, LLC (LLNS) periodically submits a CBDPP to the National Nuclear Security Administration/Livermore Site Office (NNSA/LSO). The requirements of this plan are communicated to LLNS workers through ES&H Manual Document 14.4, 'Working Safely with Beryllium.' 10 CFR 850 is implemented by the LLNL CBDPP, which integrates the safety and health standards required by the regulation, components of the LLNL Integrated Safety Management System (ISMS), and incorporates other components of the LLNL ES&H Program. As described in the regulation, and to fully comply with the regulation, specific portions of existing programs and additional requirements are identified in the CBDPP. The CBDPP is implemented by documents that interface with the workers, principally through ES&H Manual Document 14.4. This document contains information on how the management practices prescribed by the LLNL ISMS are implemented, how beryllium hazards that are associated with LLNL work activities are controlled, and who is responsible for implementing the controls. Adherence to the requirements and processes described in the ES&H Manual ensures that ES&H practices across LLNL are developed in a consistent manner. Other implementing documents, such as the ES&H Manual, are integral in effectively implementing 10 CFR 850.« less
Energy Efficiency/Renewable Energy Programs in State Implementation Plans - Guidance Documents
final document that provides guidance to States and local areas on quantifying and including emission reductions from energy efficiency and renewable energy measures in State Implementation Plans (SIPS).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Spalding, B.P.; Naney, M.T.
1995-06-01
This plan is to be implemented for Phase III ISV operations and post operations sampling. Two previous project phases involving site characterization have been completed and required their own site specific health and safety plans. Project activities will take place at Seepage Pit 1 in Waste Area Grouping 7 at ORNL, Oak Ridge, Tennessee. Purpose of this document is to establish standard health and safety procedures for ORNL project personnel and contractor employees in performance of this work. Site activities shall be performed in accordance with Energy Systems safety and health policies and procedures, DOE orders, Occupational Safety and Healthmore » Administration Standards 29 CFR Part 1910 and 1926; applicable United States Environmental Protection Agency requirements; and consensus standards. Where the word ``shall`` is used, the provisions of this plan are mandatory. Specific requirements of regulations and orders have been incorporated into this plan in accordance with applicability. Included from 29 CFR are 1910.120 Hazardous Waste Operations and Emergency Response; 1910.146, Permit Required - Confined Space; 1910.1200, Hazard Communication; DOE Orders requirements of 5480.4, Environmental Protection, Safety and Health Protection Standards; 5480.11, Radiation Protection; and N5480.6, Radiological Control Manual. In addition, guidance and policy will be followed as described in the Environmental Restoration Program Health and Safety Plan. The levels of personal protection and the procedures specified in this plan are based on the best information available from reference documents and site characterization data. Therefore, these recommendations represent the minimum health and safety requirements to be observed by all personnel engaged in this project.« less
Plan Execution Interchange Language (PLEXIL)
NASA Technical Reports Server (NTRS)
Estlin, Tara; Jonsson, Ari; Pasareanu, Corina; Simmons, Reid; Tso, Kam; Verma, Vandi
2006-01-01
Plan execution is a cornerstone of spacecraft operations, irrespective of whether the plans to be executed are generated on board the spacecraft or on the ground. Plan execution frameworks vary greatly, due to both different capabilities of the execution systems, and relations to associated decision-making frameworks. The latter dependency has made the reuse of execution and planning frameworks more difficult, and has all but precluded information sharing between different execution and decision-making systems. As a step in the direction of addressing some of these issues, a general plan execution language, called the Plan Execution Interchange Language (PLEXIL), is being developed. PLEXIL is capable of expressing concepts used by many high-level automated planners and hence provides an interface to multiple planners. PLEXIL includes a domain description that specifies command types, expansions, constraints, etc., as well as feedback to the higher-level decision-making capabilities. This document describes the grammar and semantics of PLEXIL. It includes a graphical depiction of this grammar and illustrative rover scenarios. It also outlines ongoing work on implementing a universal execution system, based on PLEXIL, using state-of-the-art rover functional interfaces and planners as test cases.
Code of Federal Regulations, 2010 CFR
2010-04-01
... employee benefit plan information required by Item 1 of the Form; (ii) The statement of availability of registrant information, employee benefit plan annual reports and other information required by Item 2; and (iii) The documents containing registrant information and employee benefit plan annual reports that are...
A Plan for: A Consumer Conference for Older Adults.
ERIC Educational Resources Information Center
Zarakov, Selma
This document provides a step-by-step description of the planning and implementation of a two day consumer concerns conference for older adults held at Palomar Community College (California). The bulk of the document is made up of practical discussions of such planning phases as facility selection and decoration, conference publicity, snack and…
30 CFR 746.13 - Decision document and recommendation on mining plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Decision document and recommendation on mining plan. 746.13 Section 746.13 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR FEDERAL LANDS PROGRAM REVIEW AND APPROVAL OF MINING PLANS § 746.13 Decision...
Information security management system planning for CBRN facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lenaeu, Joseph D.; O'Neil, Lori Ross; Leitch, Rosalyn M.
The focus of this document is to provide guidance for the development of information security management system planning documents at chemical, biological, radiological, or nuclear (CBRN) facilities. It describes a risk-based approach for planning information security programs based on the sensitivity of the data developed, processed, communicated, and stored on facility information systems.
Enhancing The National Map Through Tactical Planning and Performance Monitoring
,
2008-01-01
Tactical planning and performance monitoring are initial steps toward improving 'the way The National Map works' and supporting the U.S. Geological Survey (USGS) Science Strategy. This Tactical Performance Planning Summary for The National Map combines information from The National Map 2.0 Tactical Plan and The National Map Performance Milestone Matrix. The National Map 2.0 Tactical Plan is primarily a working document to guide The National Map program's execution, production, and metrics monitoring for fiscal years (FY) 2008 and 2009. The Tactical Plan addresses data, products, and services, as well as supporting and enabling activities. The National Map's 2-year goal for FY 2008 and FY 2009 is to provide a range of geospatial products and services that further the National Spatial Data Infrastructure and underpin USGS science. To do this, the National Geospatial Program will develop a renewed understanding during FY 2008 of key customer needs and requirements, develop the infrastructure to support The National Map business model, modernize its business processes, and reengineer its workforce. Priorities for The National Map will be adjusted if necessary to respond to changes to the project that may impact resources, constrain timeframes, or change customer needs. The supporting and enabling activities that make it possible to produce the products and services of The National Map will include partnership activities, improved compatibility of systems, outreach, and integration of data themes.
43 CFR 46.315 - How to format an environmental assessment.
Code of Federal Regulations, 2010 CFR
2010-10-01
... planning, decision-making, and appropriate public participation. (b) An environmental assessment may be accompanied by any other planning or decision-making document. The portion of the document that analyzes the...
Fluor Daniel Hanford Inc. integrated safety management system phase 1 verification final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
PARSONS, J.E.
1999-10-28
The purpose of this review is to verify the adequacy of documentation as submitted to the Approval Authority by Fluor Daniel Hanford, Inc. (FDH). This review is not only a review of the Integrated Safety Management System (ISMS) System Description documentation, but is also a review of the procedures, policies, and manuals of practice used to implement safety management in an environment of organizational restructuring. The FDH ISMS should support the Hanford Strategic Plan (DOE-RL 1996) to safely clean up and manage the site's legacy waste; deploy science and technology while incorporating the ISMS theme to ''Do work safely''; andmore » protect human health and the environment.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Suter, G.W. II; Sample, B.E.; Jones, D.S.
1995-09-01
The purpose of this document is to provide guidance for planning and performing ecological risk assessments (ERAs) on the Oak Ridge Reservation (ORR). It is the third such document prepared for this purpose. The first ecorisk strategy document described the ERA process and presented a tiered approach to ERAs appropriate to complex sites. The first revision was necessitated by the considerable progress that has been made by the parties to the Federal Facilities Agreement (FFA) for the ORR in resolving specific issues relating to ERA as a result of a series of data quality objectives (DQOs) meetings. The tiered approachmore » to ERAs as recommended in the first document was implemented, generic conceptual models were developed, and a general approach for developing ecological assessment endpoints and measurement endpoints was agreed upon. This revision is necessitated by comments from the US Environmental Protection Agency`s Region IV and the Tennessee Department of Environment and Conservation (TDEC) which clarified and modified the positions taken during the DQO process. In particular, support for the collection of data that would support ERAs for all OUs on the ORR have been withdrawn. Therefore, the work plan developed to fill the reservation-wide data needs identified in the DQO process has also been withdrawn, and portions that are still relevant have been incorporated into this document. The reader should be aware that this guidance is complex and lengthy because it attempts to cover all the reasonable contingencies that were considered to be potentially important to the FFA parties.« less
Lamas, Daniela; Panariello, Natalie; Henrich, Natalie; Hammes, Bernard; Hanson, Laura C; Meier, Diane E; Guinn, Nancy; Corrigan, Janet; Hubber, Sean; Luetke-Stahlman, Hannah; Block, Susan
2018-04-01
To develop a set of clinically relevant recommendations to improve the state of advance care planning (ACP) documentation in the electronic health record (EHR). Advance care planning (ACP) is a key process that supports goal-concordant care. For preferences to be honored, clinicians must be able to reliably record, find, and use ACP documentation. However, there are no standards to guide ACP documentation in the electronic health record (EHR). We interviewed 21 key informants to understand the strengths and weaknesses of EHR documentation systems for ACP and identify best practices. We analyzed these interviews using a qualitative content analysis approach and subsequently developed a preliminary set of recommendations. These recommendations were vetted and refined in a second round of input from a national panel of content experts. Informants identified six themes regarding current inadequacies in documentation and accessibility of ACP information and opportunities for improvement. We offer a set of concise, clinically relevant recommendations, informed by expert opinion, to improve the state of ACP documentation in the EHR.
NASA software documentation standard software engineering program
NASA Technical Reports Server (NTRS)
1991-01-01
The NASA Software Documentation Standard (hereinafter referred to as Standard) can be applied to the documentation of all NASA software. This Standard is limited to documentation format and content requirements. It does not mandate specific management, engineering, or assurance standards or techniques. This Standard defines the format and content of documentation for software acquisition, development, and sustaining engineering. Format requirements address where information shall be recorded and content requirements address what information shall be recorded. This Standard provides a framework to allow consistency of documentation across NASA and visibility into the completeness of project documentation. This basic framework consists of four major sections (or volumes). The Management Plan contains all planning and business aspects of a software project, including engineering and assurance planning. The Product Specification contains all technical engineering information, including software requirements and design. The Assurance and Test Procedures contains all technical assurance information, including Test, Quality Assurance (QA), and Verification and Validation (V&V). The Management, Engineering, and Assurance Reports is the library and/or listing of all project reports.
NASA Technical Reports Server (NTRS)
Callender, E. David; Steinbacher, Jody
1989-01-01
This is the second of five volumes of the Information System Life-Cycle and Documentation Standards. This volume provides a well-organized, easily used standard for management plans used in acquiring, assuring, and developing information systems and software, hardware, and operational procedures components, and related processes.
Implementation of Industrial Work Practice management at vocational high school
NASA Astrophysics Data System (ADS)
Widodo, Joko; Samsudi, Sunyoto
2017-03-01
The purpose of this study was to develop a management model of entrepreneurship-based Industrial Work Practice (Prakerin) at Vocational High School. This research was planned for three years under Research and Development design. The respondents were public and private Vocational High Schools in Semarang, Salatiga and District of Demak, Central Java, Indonesia. Data were collected through interviews, questionnaires, observation, and documentation. The data were analyzed qualitatively and quantitatively. Preliminary study shows that the implementation of Industrial Work Practice at Vocational High School, which has been carried out, was only to prepare the graduates to become an employee of the industry instead of entrepreneur. Further study is needed to develop a management model of entrepreneurship-based Industrial Work Practice at Vocational High School.
Intersectoral planning for city health development.
Green, Geoff
2012-04-01
The article reviews the evolution and process of city health development planning (CHDP) in municipalities participating in the European Network of Healthy Cities organized by the European Region of the World Health Organization. The concept of CHDP combines elements from three theoretical domains: (a) health development, (b) city governance, and (c) urban planning. The setting was the 77 cities which participated in Phase IV (2003-2008) of the network. Evidence was gathered principally from a general evaluation questionnaire sent to all network cities. CHDPs are strategic documents giving direction to municipalities and partner agencies. Analysis revealed a trend away from "classic" CHDPs with a primary focus on health development towards ensuring a health dimension to other sector plans, and into the overarching strategies of city governments. Linked to the Phase IV priority themes of Healthy aging and healthy urban planning, cities further developed the concept and application of human-centered sustainability. More work is required to utilize cost-benefit analysis and health impact assessment to unmask the synergies between health and economic prosperity.
Natural Resource Management Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Green, T.; Schwager, K.
This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265-acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 15 years by the Naturalmore » Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan works toward sound ecological management that not only benefits BNL’s ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text.« less
Dolan, R; Broadbent, P
2016-02-01
Ward round documentation provides one of the most important means of communication between healthcare professionals. We aimed to establish if the use of a problem based standardised proforma can improve documentation in acute surgical receiving. Gold standards were established using the RCSE record keeping guidelines. We audited documentation for seven days using the following headings: patient name/identification number, subjective findings, objective findings, clinical impression/diagnosis, plan, diet status, discharge decision, discharge planning, signature, and grade. After the initial audit cycle, a ward round proforma was introduced using the above headings and re-audited over a seven day period. The pre-intervention arm contained 50 patients and the post intervention arm contained 47. The following headings showed an improvement in documentation compliance to 100%: patient name/identification number vs 96%, subjective findings vs 84%, objective findings vs 48%, plan vs 98%, signature vs 96%, and grade vs 62%. Documentation of the clinical impression/diagnosis improved to 98% vs 30%, diet status rose to 83% vs 16%, discharge decision to 66% vs 16%, and discharge planning to 40% vs 20%. Standardised proformas improve the documentation of post-take ward round notes. This helps to clarify the onward management plan for all aspects of a patient's care and will help avoid adverse events and litigation. This should improve the quality and safety of Patient Care.
EPA Guidance for Geospatially Related Quality Assurance Project Plans
This March 2003 document discusses EPA's Quality Assurance (QA) Project Plan as a tool for project managers and planners to document the type and quality of data and information needed for making environmental decisions
Validation of a Novel Electronic Health Record Patient Portal Advance Care Planning Delivery System.
Bose-Brill, Seuli; Feeney, Michelle; Prater, Laura; Miles, Laura; Corbett, Angela; Koesters, Stephen
2018-06-26
Advance care planning allows patients to articulate their future care preferences should they no longer be able to make decisions on their own. Early advance care planning in outpatient settings provides benefits such as less aggressive care and fewer hospitalizations, yet it is underutilized due to barriers such as provider time constraints and communication complexity. Novel methods, such as patient portals, provide a unique opportunity to conduct advance care planning previsit planning for outpatient care. This follow-up to our pilot study aimed to conduct pragmatic testing of a novel electronic health record-tethered framework and its effects on advance care planning delivery in a real-world primary care setting. Our intervention tested a previsit advance care planning workflow centered around a framework sent via secure electronic health record-linked patient portal in a real-world clinical setting. The primary objective of this study was to determine its impact on frequency and quality of advance care planning documentation. We conducted a pragmatic trial including 2 sister clinical sites, one site implementing the intervention and the other continuing standard care. A total of 419 patients aged between 50 and 93 years with active portal accounts received intervention (n=200) or standard care (n=219). Chart review analyzed the presence of advance care planning and its quality and was graded with previously established scoring criteria based on advance care planning best practice guidelines from multiple nations. A total of 19.5% (39/200) of patients who received previsit planning responded to the framework. We found that the intervention site had statistically significant improvement in new advance care planning documentation rates (P<.01) and quality (P<.01) among all eligible patients. Advance care planning documentation rates increased by 105% (19/39 to 39/39) and quality improved among all patients who engaged in the previsit planning framework (n=39). Among eligible patients aged between 50 and 60 years at the intervention site, advance care planning documentation rates increased by 37% (27/96 to 37/96). Advance care planning documentation rates increased 34% among high users (27/67 to 36/67). Advance care planning previsit planning using a secure electronic health record-supported patient portal framework yielded improvement in the presence of advance care planning documentation, with highest improvement in active patient portal users and patients aged between 50 and 60 years. Targeted previsit patient portal advance care planning delivery in these populations can potentially improve the quality of care in these populations. ©Seuli Bose-Brill, Michelle Feeney, Laura Prater, Laura Miles, Angela Corbett, Stephen Koesters. Originally published in the Journal of Medical Internet Research (http://www.jmir.org), 26.06.2018.
N Reactor Deactivation Program Plan. Revision 4
DOE Office of Scientific and Technical Information (OSTI.GOV)
Walsh, J.L.
1993-12-01
This N Reactor Deactivation Program Plan is structured to provide the basic methodology required to place N Reactor and supporting facilities {center_dot} in a radiologically and environmentally safe condition such that they can be decommissioned at a later date. Deactivation will be in accordance with facility transfer criteria specified in Department of Energy (DOE) and Westinghouse Hanford Company (WHC) guidance. Transition activities primarily involve shutdown and isolation of operational systems and buildings, radiological/hazardous waste cleanup, N Fuel Basin stabilization and environmental stabilization of the facilities. The N Reactor Deactivation Program covers the period FY 1992 through FY 1997. The directivemore » to cease N Reactor preservation and prepare for decommissioning was issued by DOE to WHC on September 20, 1991. The work year and budget data supporting the Work Breakdown Structure in this document are found in the Activity Data Sheets (ADS) and the Environmental Restoration Program Baseline, that are prepared annually.« less
Performance Analysis: Work Control Events Identified January - August 2010
DOE Office of Scientific and Technical Information (OSTI.GOV)
De Grange, C E; Freeman, J W; Kerr, C E
2011-01-14
This performance analysis evaluated 24 events that occurred at LLNL from January through August 2010. The analysis identified areas of potential work control process and/or implementation weaknesses and several common underlying causes. Human performance improvement and safety culture factors were part of the causal analysis of each event and were analyzed. The collective significance of all events in 2010, as measured by the occurrence reporting significance category and by the proportion of events that have been reported to the DOE ORPS under the ''management concerns'' reporting criteria, does not appear to have increased in 2010. The frequency of reporting inmore » each of the significance categories has not changed in 2010 compared to the previous four years. There is no change indicating a trend in the significance category and there has been no increase in the proportion of occurrences reported in the higher significance category. Also, the frequency of events, 42 events reported through August 2010, is not greater than in previous years and is below the average of 63 occurrences per year at LLNL since 2006. Over the previous four years, an average of 43% of the LLNL's reported occurrences have been reported as either ''management concerns'' or ''near misses.'' In 2010, 29% of the occurrences have been reported as ''management concerns'' or ''near misses.'' This rate indicates that LLNL is now reporting fewer ''management concern'' and ''near miss'' occurrences compared to the previous four years. From 2008 to the present, LLNL senior management has undertaken a series of initiatives to strengthen the work planning and control system with the primary objective to improve worker safety. In 2008, the LLNL Deputy Director established the Work Control Integrated Project Team to develop the core requirements and graded elements of an institutional work planning and control system. By the end of that year this system was documented and implementation had begun. In 2009, training of the workforce began and as of the time of this report more than 50% of authorized Integration Work Sheets (IWS) use the activity-based planning process. In 2010, LSO independently reviewed the work planning and control process and confirmed to the Laboratory that the Integrated Safety Management (ISM) System was implemented. LLNL conducted a cross-directorate management self-assessment of work planning and control and is developing actions to respond to the issues identified. Ongoing efforts to strengthen the work planning and control process and to improve the quality of LLNL work packages are in progress: completion of remaining actions in response to the 2009 DOE Office of Health, Safety, and Security (HSS) evaluation of LLNL's ISM System; scheduling more than 14 work planning and control self-assessments in FY11; continuing to align subcontractor work control with the Institutional work planning and control system; and continuing to maintain the electronic IWS application. The 24 events included in this analysis were caused by errors in the first four of the five ISMS functions. The most frequent cause was errors in analyzing the hazards (Function 2). The second most frequent cause was errors occurring when defining the work (Function 1), followed by errors during the performance of work (Function 4). Interestingly, very few errors in developing controls (Function 3) resulted in events. This leads one to conclude that if improvements are made to defining the scope of work and analyzing the potential hazards, LLNL may reduce the frequency or severity of events. Analysis of the 24 events resulted in the identification of ten common causes. Some events had multiple causes, resulting in the mention of 39 causes being identified for the 24 events. The most frequent cause was workers, supervisors, or experts believing they understood the work and the hazards but their understanding was incomplete. The second most frequent cause was unclear, incomplete or confusing documents directing the work. Together, these two causes were mentioned 17 times and contributed to 13 of the events. All of the events with the cause of ''workers, supervisors, or experts believing they understood the work and the hazards but their understanding was incomplete'' had this error in the first two ISMS functions: define the work and analyze the hazard. This means that these causes result in the scope of work being ill-defined or the hazard(s) improperly analyzed. Incomplete implementation of these functional steps leads to the hazards not being controlled. The causes are then manifested in events when the work is conducted. The process to operate safely relies on accurately defining the scope of work. This review has identified a number of examples of latent organizational weakness in the execution of work control processes.« less
Curriculum Planning and Some Current Health Problems. Educational Studies and Documents, No. 13.
ERIC Educational Resources Information Center
Southworth, Warren H.
This document is a supplement to the UNESCO Source Book "Planning for Health Education in Schools" by C. E. Turner. It is intended for those directly concerned with curriculum planning in relation to health--school administrators, health education supervisors, curriculum specialists, individual teachers--but it is also thought to be of interest to…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-10
... plan revision. The Comprehensive Evaluation Report (CER) provided for public review and comment in 2006, built upon the AMS and documents the evaluation of the 1987 Forest Plans and proposed changes. The CER.... The CER, under the 2005 and 2008 Planning Rules, served as the principle document that supported the...
Child Care and Education: The Critical Connection. Action Plan [and] Policy Statement.
ERIC Educational Resources Information Center
Child Care Action Campaign, New York, NY.
This document presents the action plan of the Child Care Action Campaign (CCAC) for improving the quantity and quality of child care services. The document also provides a policy statement on linking education and child care efforts. The action plan describes CCAC's vision of a streamlined system providing child care to infants and toddlers,…
Planning guidance for the Chemical Stockpile Emergency Preparedness Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shumpert, B.L.; Watson, A.P.; Sorensen, J.H.
1995-02-01
This planning guide was developed under the direction of the U.S. Army and the Federal Emergency Management Agency (FEMA) which jointly coordinate and direct the development of the Chemical Stockpile Emergency Preparedness Program (CSEPP). It was produced to assist state, local, and Army installation planners in formulating and coordinating plans for chemical events that may occur at the chemical agent stockpile storage locations in the continental United States. This document provides broad planning guidance for use by both on-post and off-post agencies and organizations in the development of a coordinated plan for responding to chemical events. It contains checklists tomore » assist in assuring that all important aspects are included in the plans and procedures developed at each Chemical Stockpile Disposal Program (CSDP) location. The checklists are supplemented by planning guidelines in the appendices which provide more detailed guidance regarding some issues. The planning guidance contained in this document will help ensure that adequate coordination between on-post and off-post planners occurs during the planning process. This planning guide broadly describes an adequate emergency planning base that assures that critical planning decisions will be made consistently at every chemical agent stockpile location. This planning guide includes material drawn from other documents developed by the FEMA, the Army, and other federal agencies with emergency preparedness program responsibilities. Some of this material has been developed specifically to meet the unique requirements of the CSEPP. In addition to this guidance, other location-specific documents, technical studies, and support studies should be used as needed to assist in the planning at each of the chemical agent stockpile locations to address the specific hazards and conditions at each location.« less
2017-02-22
include their legal advisors from the Judge Advocate General’s Corps. While this structure works during operations, there are those areas of...personnel file and includes elementary estate planning and legal counseling; usually, a service member will review their emergency contact...information, life insurance policy, and, if necessary, draft a will and ancillary documents. Ideally, the service member will have no legal issues, and move
Brooks, Elizabeth; Dailey, Nancy K; Bair, Byron D; Shore, Jay H
2016-09-01
Many work to ensure that women veterans receive appropriate and timely health care, yet the needs of those living in rural areas are often ignored. This is a critical oversight given the multitude of reports documenting rural access problems and health disparities. Lacking this, we are unable to plan for and evaluate appropriate care for this specific group. In this project, we spoke with rural women veterans to document service needs and quality of care from their perspective. Rural women veterans' views about health care access and quality were ascertained in a series of five, semistructured focus groups (n = 35) and completion of a demographic questionnaire. Content analysis documented focus-group themes. Participants said that local dental, mental health, and gender-specific care options were needed, as well as alternative healing options. Community-based support for women veterans and interaction with female peers were absent. Participants' support for telehealth was mixed, as were requests for gender-specific care. Personal experiences in the military impacted participants' current service utilization. Action by both Veterans Affairs and the local community is vital to improving the health of women veterans. Service planning should consider additional Veterans Affairs contracts, mobile health vans, peer support, and enhanced outreach. Reprint & Copyright © 2016 Association of Military Surgeons of the U.S.
ERIC Educational Resources Information Center
Hutchens, Dorothy
This lesson plan for elementary-age children studies some of the primary source documents and symbols of freedom which were and are important for the nation. The lesson plan uses the following documents: "The Mayflower Compact"; "The Declaration of Independence"; "The Constitution"; and the "Bill of Rights."…
The purpose of this memorandum is to ensure that EPA Regions scrutinize all proposed plans, draft and final RODs, and post-ROD documents that address institutional controls (ICs) in order to verify that they adequately document the objectives of the ICs and clearly identify who has responsibility for implementation, monitoring, reporting, and enforcement of the IC.
NASA Astrophysics Data System (ADS)
Angel, V.; Garvey, A.; Sydor, M.
2017-08-01
In the face of changing economies and patterns of development, the definition of heritage is diversifying, and the role of inventories in local heritage planning is coming to the fore. The Durand neighbourhood is a layered and complex area located in inner-city Hamilton, Ontario, Canada, and the second subject area in a set of pilot inventory studies to develop a new city-wide inventory strategy for the City of Hamilton,. This paper presents an innovative digital workflow developed to undertake the Durand Built Heritage Inventory project. An online database was developed to be at the centre of all processes, including digital documentation, record management, analysis and variable outputs. Digital tools were employed for survey work in the field and analytical work in the office, resulting in a GIS-based dataset that can be integrated into Hamilton's larger municipal planning system. Together with digital mapping and digitized historical resources, the Durand database has been leveraged to produce both digital and static outputs to shape recommendations for the protection of Hamilton's heritage resources.
Distribution of a Generic Mission Planning and Scheduling Toolkit for Astronomical Spacecraft
NASA Technical Reports Server (NTRS)
Kleiner, Steven C.
1996-01-01
Work is progressing as outlined in the proposal for this contract. A working planning and scheduling system has been documented and packaged and made available to the WIRE Small Explorer group at JPL, the FUSE group at JHU, the NASA/GSFC Laboratory for Astronomy and Solar Physics and the Advanced Planning and Scheduling Branch at STScI. The package is running successfully on the WIRE computer system. It is expected that the WIRE will reuse significant portions of the SWAS code in its system. This scheduling system itself was tested successfully against the spacecraft hardware in December 1995. A fully automatic scheduling module has been developed and is being added to the toolkit. In order to maximize reuse, the code is being reorganized during the current build into object-oriented class libraries. A paper describing the toolkit has been written and is included in the software distribution. We have experienced interference between the export and production versions of the toolkit. We will be requesting permission to reprogram funds in order to purchase a standalone PC onto which to offload the export version.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ankrum, A.R.; Bohlander, K.L.; Gilbert, E.R.
This report provides the results of comparisons of the cited and latest versions of ANS, ASME, AWS and NFPA standards cited in the NRC Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants (NUREG 0800) and related documents. The comparisons were performed by Battelle Pacific Northwest Laboratories in support of the NRC`s Standard Review Plan Update and Development Program. Significant changes to the standards, from the cited version to the latest version, are described and discussed in a tabular format for each standard. Recommendations for updating each citation in the Standard Review Plan are presented.more » Technical considerations and suggested changes are included for related regulatory documents (i.e., Regulatory Guides and the Code of Federal Regulations) citing the standard. The results and recommendations presented in this document have not been subjected to NRC staff review.« less
300 Area waste acid treatment system closure plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
LUKE, S.N.
1999-05-17
The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOERL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion includes closure plan documentation submitted for individual, treatment, storage, and/or disposal units undergoing closure, such as the 300 Area Waste Acid Treatment System. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Whenever appropriate, 300 Area Waste Acid Treatment System documentation makes cross-reference to themore » General Information Portion, rather than duplicating text. This 300 Area Waste Acid Treatment System Closure Plan (Revision 2) includes a Hanford Facility Dangerous Waste Permit Application, Part A, Form 3. Information provided in this closure plan is current as of April 1999.« less
Center Planning and Development Student Engineer at KSC
NASA Technical Reports Server (NTRS)
Jenkins, Kenneth T., Jr.
2015-01-01
This summer I was the Student Trainee (Engineering) Pathways Intern (co-op) at the Kennedy Space Center (KSC) in the Center Planning & Development (CPD) Directorate. CPD works with commercial companies who are interested in using KSC's unique capabilities for spaceflight, spacecraft processing, ground systems and Research & Development (R&D) projects that fall in line with NASA's Mission and Vision. CPD is divided into three (3) groups: (1) AD-A, which works on the Master Planning for the center, (2) AD-B (where I am), which works on project control, management and integration, and (3) AD-C, which works on partnership development. CPD's main goal is to make KSC the world's preeminent multi-user spaceport and maintain the center as a leader in space exploration. CPD is a very diverse group of employees having a wide knowledge of not only the Space Shuttle, but also Expendable Launch Vehicles (ELV). The director of CPD, Scott Colloredo, is on the advisory board for Commercial Space Operations (CSO) and has a degree from ERAU. I worked on a number of different tasks for AD-B, as well as CPD, that includes, but not limited to: reviewing and reissuing engineering documents, weekly notes for CPD and senior management, engineering familiarizations with facilities at KSC, leading a tour for the Embry-Riddle Aeronautical University Career Services office, and working on actual agreements/proposals that will be used in the partnership process with multiple partners, along with other projects. Most of the work I have done is sensitive information and cannot be disclosed.
Enhancing the many-to-many relations across IHE document sharing communities.
Ribeiro, Luís S; Costa, Carlos; Oliveira, José Luís
2012-01-01
The Integrating Healthcare Enterprise (IHE) initiative is an ongoing project aiming to enable true inter-site interoperability in the health IT field. IHE is a work in progress and many challenges need to be overcome before the healthcare Institutions may share patient clinical records transparently and effortless. Configuring, deploying and testing an IHE document sharing community requires a significant effort to plan and maintain the supporting IT infrastructure. With the new paradigm of cloud computing is now possible to launch software devices on demand and paying accordantly to the usage. This paper presents a framework designed with purpose of expediting the creation of IHE document sharing communities. It provides semi-ready templates of sharing communities that will be customized according the community needs. The framework is a meeting point of the healthcare institutions, creating a favourable environment that might converge in new inter-institutional professional relationships and eventually the creation of new Affinity Domains.
Final work plan : environmental site investigation at Sylvan Grove, Kansas.
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaFreniere, L. M.
In 1998, carbon tetrachloride was found above the maximum contaminant level (MCL) of 5 {micro}g/L in groundwater from one private livestock well at Sylvan Grove, Kansas, by the Kansas Department of Health and Environment (KDHE). The 1998 KDHE sampling was conducted under the U.S. Department of Agriculture (USDA) private well sampling program. The Commodity Credit Corporation (CCC), a USDA agency, operated a grain storage facility in Sylvan Grove from 1954 to1966. Carbon tetrachloride is the contaminant of primary concern at sites associated with former CCC/USDA grain storage operations. Sylvan Grove is located in western Lincoln County, approximately 60 mi westmore » of Salina (Figure 1.1). To determine whether the former CCC/USDA facility at Sylvan Grove is a potential contaminant source and its possible relationship to the contamination in groundwater, the CCC/USDA has agreed to conduct an investigation, in accordance with the Intergovernmental Agreement between the KDHE and the Farm Service Agency (FSA) of the USDA. This Work Plan presents historical data related to previous investigations, grain storage operations, local private wells and public water supply (PWS) wells, and local geologic and hydrogeologic conditions at Sylvan Grove. The findings from a review of all available documents are discussed in Section 2. On the basis of the analyses of historical data, the following specific technical objectives are proposed for the site investigation at Sylvan Grove: (1) Evaluate the potential source of carbon tetrachloride at the former CCC/USDA facility; (2) Determine the relationship of potential contamination (if present) at the former CCC/USDA facility to contamination identified in 1998 in groundwater samples from one private well to the west; and (3) Delineate the extent of potential contamination associated with the former CCC/USDA facility. The detailed scope of work is outlined in Section 3. The results of the proposed work will provide the basis for determining what future CCC/USDA actions may be necessary, with the ultimate goal of achieving classification of the Sylvan Grove site at no further action status. The proposed activities are to be performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory, a nonprofit, multidisciplinary research center operated by the UChicago Argonne, LLC, for the U.S. Department of Energy. Argonne provides technical assistance to the CCC/USDA concerning environmental site characterization and remediation at former grain storage facilities. Argonne issued a Master Work Plan (Argonne 2002) that has been approved by the KDHE. The Master Work Plan describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. That document should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Sylvan Grove.« less
Introduction and development of NCP using ICNP in Pakistan.
Rukanuddin, R J
2005-12-01
Traditionally, nursing care has been described as performing nursing tasks and often focused on nurses carrying out doctors' orders. In many countries of the world, including Pakistan, nurses do not document care in a standardized manner. Because of this limitation many health administrators, policy makers, and consumers make inadequate assumptions about nursing work, often regarding nurses as any other 'health care technician' who can be easily replaced by more economical health care workers. To overcome this problem, standardized documentation is being introduced into the Aga Khan University School of Nursing and hospital, Aga Khan Health Services, Public Health School in Karachi, and government colleges of nursing, using the International Classification for Nursing Practice (ICNP). The purpose of this paper is to highlight the process of introducing and developing standardized nursing care plans (NCP) using ICNP in Pakistan. The process for introducing ICNP consists of four components, including administrative planning, development, teaching and training, and testing. Subsets of the ICNP for (i) maternity: antenatal, postnatal and natal care; and (ii) cardiology were developed using standardized NCPs. The subsets were developed by nurse experts and introduced at the testing sites. The testing will be conducted as a pilot project. Findings from the pilot will be used to continue and expand standardized nursing documentation using the ICNP across Pakistan. Through this project, nurses, midwives and lady health visitors (midwives, vaccinator and health educators) will test standardization of documentation and begin to evaluate efficiency and effectiveness of clinical practice.
Drift-Scale Coupled Processes (DST and THC Seepage) Models
DOE Office of Scientific and Technical Information (OSTI.GOV)
E. Gonnenthal; N. Spyoher
The purpose of this Analysis/Model Report (AMR) is to document the Near-Field Environment (NFE) and Unsaturated Zone (UZ) models used to evaluate the potential effects of coupled thermal-hydrologic-chemical (THC) processes on unsaturated zone flow and transport. This is in accordance with the ''Technical Work Plan (TWP) for Unsaturated Zone Flow and Transport Process Model Report'', Addendum D, Attachment D-4 (Civilian Radioactive Waste Management System (CRWMS) Management and Operating Contractor (M and O) 2000 [153447]) and ''Technical Work Plan for Nearfield Environment Thermal Analyses and Testing'' (CRWMS M and O 2000 [153309]). These models include the Drift Scale Test (DST) THCmore » Model and several THC seepage models. These models provide the framework to evaluate THC coupled processes at the drift scale, predict flow and transport behavior for specified thermal loading conditions, and predict the chemistry of waters and gases entering potential waste-emplacement drifts. The intended use of this AMR is to provide input for the following: (1) Performance Assessment (PA); (2) Abstraction of Drift-Scale Coupled Processes AMR (ANL-NBS-HS-000029); (3) UZ Flow and Transport Process Model Report (PMR); and (4) Near-Field Environment (NFE) PMR. The work scope for this activity is presented in the TWPs cited above, and summarized as follows: continue development of the repository drift-scale THC seepage model used in support of the TSPA in-drift geochemical model; incorporate heterogeneous fracture property realizations; study sensitivity of results to changes in input data and mineral assemblage; validate the DST model by comparison with field data; perform simulations to predict mineral dissolution and precipitation and their effects on fracture properties and chemistry of water (but not flow rates) that may seep into drifts; submit modeling results to the TDMS and document the models. The model development, input data, sensitivity and validation studies described in this AMR are required to fully document and address the requirements of the TWPs.« less
Drift-Scale Coupled Processes (DST and THC Seepage) Models
DOE Office of Scientific and Technical Information (OSTI.GOV)
E. Sonnenthale
The purpose of this Analysis/Model Report (AMR) is to document the Near-Field Environment (NFE) and Unsaturated Zone (UZ) models used to evaluate the potential effects of coupled thermal-hydrologic-chemical (THC) processes on unsaturated zone flow and transport. This is in accordance with the ''Technical Work Plan (TWP) for Unsaturated Zone Flow and Transport Process Model Report'', Addendum D, Attachment D-4 (Civilian Radioactive Waste Management System (CRWMS) Management and Operating Contractor (M&O) 2000 [1534471]) and ''Technical Work Plan for Nearfield Environment Thermal Analyses and Testing'' (CRWMS M&O 2000 [153309]). These models include the Drift Scale Test (DST) THC Model and several THCmore » seepage models. These models provide the framework to evaluate THC coupled processes at the drift scale, predict flow and transport behavior for specified thermal loading conditions, and predict the chemistry of waters and gases entering potential waste-emplacement drifts. The intended use of this AMR is to provide input for the following: Performance Assessment (PA); Near-Field Environment (NFE) PMR; Abstraction of Drift-Scale Coupled Processes AMR (ANL-NBS-HS-000029); and UZ Flow and Transport Process Model Report (PMR). The work scope for this activity is presented in the TWPs cited above, and summarized as follows: Continue development of the repository drift-scale THC seepage model used in support of the TSPA in-drift geochemical model; incorporate heterogeneous fracture property realizations; study sensitivity of results to changes in input data and mineral assemblage; validate the DST model by comparison with field data; perform simulations to predict mineral dissolution and precipitation and their effects on fracture properties and chemistry of water (but not flow rates) that may seep into drifts; submit modeling results to the TDMS and document the models. The model development, input data, sensitivity and validation studies described in this AMR are required to fully document and address the requirements of the TWPs.« less
Analysis and preliminary design of Kunming land use and planning management information system
NASA Astrophysics Data System (ADS)
Li, Li; Chen, Zhenjie
2007-06-01
This article analyzes Kunming land use planning and management information system from the system building objectives and system building requirements aspects, nails down the system's users, functional requirements and construction requirements. On these bases, the three-tier system architecture based on C/S and B/S is defined: the user interface layer, the business logic layer and the data services layer. According to requirements for the construction of land use planning and management information database derived from standards of the Ministry of Land and Resources and the construction program of the Golden Land Project, this paper divides system databases into planning document database, planning implementation database, working map database and system maintenance database. In the design of the system interface, this paper uses various methods and data formats for data transmission and sharing between upper and lower levels. According to the system analysis results, main modules of the system are designed as follows: planning data management, the planning and annual plan preparation and control function, day-to-day planning management, planning revision management, decision-making support, thematic inquiry statistics, planning public participation and so on; besides that, the system realization technologies are discussed from the system operation mode, development platform and other aspects.
Risk of Contractors’ Claims On the Example of Road Works
NASA Astrophysics Data System (ADS)
Rybka, Iwona; Bondar-Nowakowska, Elżbieta; Pawluk, Katarzyna; Połoński, Mieczysław
2017-10-01
The aim of the study is to analyse claims filed by building contractors during the project implementation. The work is divided into two parts. In the first part problems associated with the management of claims in the construction process were discussed. Bearing in mind that claims may result in prolongation of the investment or exceeding planned budget, possibilities of applying information included in documents connected with claims procedure to risk management was analysed in the second part of the study. The basis of the analysis is a review of 226 documents. They originate from 8 construction sites completed in the last 5 years in southwestern Poland. In each case, these were linear road projects, executed by different contractors, according to conditions in the contract set out in the “Yellow Book” FIDIC. In the study, other documents relating events that according to contractors entitled them to claim were also analysed. They included among others: project documentation, terms of reference, construction log, reports and correspondence under the contract. The events constituting the reason for contractors` claims were classified according to their sources. 8 areas of potential threats were distinguished. They were presented in the form of a block diagram. Most events initiating the claims were reported in the following group - adverse actions of third parties, while the fewest were recorded in the group - the lack of access to the construction site. Based on calculated similarity indicators it was found that considered construction sites were diversified in terms of the number of the events occurrence that generated the claim and their sources. In recent years, many road projects are completed behind the schedule and their initially planned budgets are significantly exceeded. Conducted research indicated that data derived from the analysis of documents connected with claims can be applied to identify and classify both cost and schedule risk factors. Obtained data can also be useful at the stage of risk control because early diagnosis of threats in relation to technical and organizational aspects is necessary to take effective action.
76 FR 69172 - Determination of Governmental Plan Status
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-08
...The Treasury Department and IRS anticipate issuing regulations under section 414(d) of the Internal Revenue Code (Code) to define the term ``governmental plan.'' This document describes the rules that the Treasury Department and IRS are considering proposing relating to the determination of whether a plan is a governmental plan within the meaning of section 414(d) and contains an appendix that includes a draft notice of proposed rulemaking on which the Treasury Department and IRS invite comments from the public. This document applies to sponsors of, and participants and beneficiaries in, employee benefit plans that are determined to be governmental plans.
Revealing Adaptive Management of Environmental Flows
NASA Astrophysics Data System (ADS)
Allan, Catherine; Watts, Robyn J.
2018-03-01
Managers of land, water, and biodiversity are working with increasingly complex social ecological systems with high uncertainty. Adaptive management (learning from doing) is an ideal approach for working with this complexity. The competing social and environmental demands for water have prompted interest in freshwater adaptive management, but its success and uptake appear to be slow. Some of the perceived "failure" of adaptive management may reflect the way success is conceived and measured; learning, rarely used as an indicator of success, is narrowly defined when it is. In this paper, we document the process of adaptive flow management in the Edward-Wakool system in the southern Murray-Darling Basin, Australia. Data are from interviews with environmental water managers, document review, and the authors' structured reflection on their experiences of adaptive management and environmental flows. Substantial learning occurred in relation to the management of environmental flows in the Edward-Wakool system, with evidence found in planning documents, water-use reports, technical reports, stakeholder committee minutes, and refereed papers, while other evidence was anecdotal. Based on this case, we suggest it may be difficult for external observers to perceive the success of large adaptive management projects because evidence of learning is dispersed across multiple documents, and learning is not necessarily considered a measure of success. We suggest that documentation and sharing of new insights, and of the processes of learning, should be resourced to facilitate social learning within the water management sector, and to help demonstrate the successes of adaptive management.
Revealing Adaptive Management of Environmental Flows.
Allan, Catherine; Watts, Robyn J
2018-03-01
Managers of land, water, and biodiversity are working with increasingly complex social ecological systems with high uncertainty. Adaptive management (learning from doing) is an ideal approach for working with this complexity. The competing social and environmental demands for water have prompted interest in freshwater adaptive management, but its success and uptake appear to be slow. Some of the perceived "failure" of adaptive management may reflect the way success is conceived and measured; learning, rarely used as an indicator of success, is narrowly defined when it is. In this paper, we document the process of adaptive flow management in the Edward-Wakool system in the southern Murray-Darling Basin, Australia. Data are from interviews with environmental water managers, document review, and the authors' structured reflection on their experiences of adaptive management and environmental flows. Substantial learning occurred in relation to the management of environmental flows in the Edward-Wakool system, with evidence found in planning documents, water-use reports, technical reports, stakeholder committee minutes, and refereed papers, while other evidence was anecdotal. Based on this case, we suggest it may be difficult for external observers to perceive the success of large adaptive management projects because evidence of learning is dispersed across multiple documents, and learning is not necessarily considered a measure of success. We suggest that documentation and sharing of new insights, and of the processes of learning, should be resourced to facilitate social learning within the water management sector, and to help demonstrate the successes of adaptive management.
Salvage plan & information sheet
DOT National Transportation Integrated Search
1997-11-05
This document allows the On Scene Coordinator (OSC) or Captain of the Port (COTP) to formulate and evaluate the impact of a Salvage Plan. Specifically, this document allows the OSC or COTP to: 1. Quickly gather all information needed during the respo...
FY 1998 Proposed Rail Improvement Program
DOT National Transportation Integrated Search
1997-01-01
The Illinois Department of Transportation has, in the past, published its Rail program yearly, and its Rail plan as needs dictate. The department has combined : both documents into one. This new document, as with those Programs and Plans : that have ...
NASA Technical Reports Server (NTRS)
1976-01-01
The following areas related to the final definition and preliminary design study of the initial atmospheric cloud physics laboratory (ACPL) were covered: (1) proposal organization, personnel, schedule, and project management, (2) proposed configurations, (3) study objectives, (4) ACPL experiment program listing and description, (5) mission/flight flexibility and modularity/commonality, (6) study plan, and (7) description of following tasks: requirement analysis and definition task flow, systems analysis and trade studies, subsystem analysis and trade studies, specifications and interface control documents, preliminary design task flow, work breakdown structure, programmatic analysis and planning, and project costs. Finally, an overview of the scientific requirements was presented.
The Village Green Project: Lesson Plans for K-8 Educators ...
This document contains lesson plans spanning kindergarten through 8th grade, that are written to connect next-generation science standards (USA) to the Village Green Project and related air quality topics. This document contains a series of classroom lesson plans to support connections between the Village Green Project and the USA National Science Standards at various education levels.
Code of Federal Regulations, 2010 CFR
2010-04-01
... plan may provide that any such document may be transferred to microfilm or other recording medium after... years or at such earlier date as is specified in a plan for the destruction or disposition of any such documents if such plan has been filed with the Commission by such exchange, association, clearing agency or...
NASA Technical Reports Server (NTRS)
Johnson, Jill W. (Compiler)
2015-01-01
This Corrective Measures Implementation (CMI) Progress Report documents: (i) activities conducted as part of supplemental assessment activities completed from June 2009 through November 2014; (ii) Engineering Evaluation (EE) Advanced Data Packages (ADPs); and (iii) recommendations for future activities related to corrective measures at the Site. Applicable meeting minutes are provided as Appendix A. The following EE ADPs for CRHE are included with this CMI Progress Report: center dot Supplemental Site Characterization ADP (Step 1 EE) (Appendix B) center dot Site Characterization ADP (Step 1 EE) for Hot Spot 1 (HS1) (Appendix C) center dot Remedial Alternatives Evaluation (Step 2 EE) ADP for HS1 (Appendix D) center dot Interim Measures Work Plan (Step 3 EE) ADP for HS1 (Appendix E) center dot Site Characterization ADP (Step 1 EE) ADP for Hot Spot 2 (HS2), High Concentration Plume (HCP), and Low Concentration Plume (LCP) (Appendix F) A summary of direct-push technology (DPT) and groundwater monitoring well sampling results are provided in Appendices G and H, respectively. The Interim Land Use Control Implementation Plan (LUCIP) is provided as Appendix I. Monitoring well completion reports, other applicable field forms, survey data, and analytical laboratory reports are provided as Appendices J through M, respectively, in the electronic copy of this document. Selected Site photographs are provided in Appendix N. The interim groundwater monitoring plan and document revision log are included as Appendices O and P, respectively. KSC Electronic Data Deliverable (KEDD) files are provided on the attached compact disk.
Reed, Jennifer L.; Munafo, Jennifer Knopf; Ekstrand, Rachel; Gillespie, Gordon; Holland, Carolyn; Britto, Maria T.
2012-01-01
BACKGROUND AND OBJECTIVE: Inadequate follow-up of positive sexually transmitted infection (STI) test results is a gap in health care quality that contributes to the epidemic of STIs in adolescent women. The goal of this study was to improve our ability to contact adolescent women with positive STI test results after an emergency department visit. METHODS: We conducted an interventional quality improvement project at a pediatric emergency department. Phase 1 included plan-do-study-act cycles to test interventions such as provider education and system changes. Phase 2 was a planned experiment studying 2 interventions (study cell phone and patient activation card), using a 2 × 2 factorial design with 1 background variable and 2 replications. Outcomes were: (1) the proportion of women aged 14 to 21 years with STI testing whose confidential telephone number was documented in the electronic medical record; (2) the proportion of STI positive women successfully contacted within 7 days. RESULTS: Phase 1 interventions increased the proportion of records with a confidential number from 24% to 58% and the proportion contacted from 45% to 65%, and decreased loss to follow-up from 40% to 24%. In phase 2, the proportion contacted decreased after the electronic medical record system changed and recording of the confidential number decreased. Study interventions (patient activation card and study cell phone) had a synergistic effect on successful contact, especially when confidential numbers were less reliably documented. CONCLUSIONS: Feasible and sustainable interventions such as improved documentation of a confidential number worked synergistically to increase our ability to successfully contact adolescent women with their STI test results. PMID:22753557
FDA plan for statutory compliance. Notice of availability.
1998-11-24
The Food and Drug Administration (FDA) is announcing the availability of a document entitled "FDA Plan for Statutory Compliance" (the plan). This document is the agency's response to section 406(b) of the Food and Drug Administration Modernization Act of 1997 (FDAMA), which requires the Secretary of the Department of Health and Human Services (the Secretary) to develop a plan bringing the agency into compliance with the requirements of the Federal Food, Drug, and Cosmetic Act (the act).
Hypersonic Vehicle Propulsion System Simplified Model Development
NASA Technical Reports Server (NTRS)
Stueber, Thomas J.; Raitano, Paul; Le, Dzu K.; Ouzts, Peter
2007-01-01
This document addresses the modeling task plan for the hypersonic GN&C GRC team members. The overall propulsion system modeling task plan is a multi-step process and the task plan identified in this document addresses the first steps (short term modeling goals). The procedures and tools produced from this effort will be useful for creating simplified dynamic models applicable to a hypersonic vehicle propulsion system. The document continues with the GRC short term modeling goal. Next, a general description of the desired simplified model is presented along with simulations that are available to varying degrees. The simulations may be available in electronic form (FORTRAN, CFD, MatLab,...) or in paper form in published documents. Finally, roadmaps outlining possible avenues towards realizing simplified model are presented.
Pöder, Ulrika; Dahm, Marie Fogelberg; Karlsson, Nina; Wadensten, Barbro
2015-10-01
To compare stroke unit staff members' documentation of care in line with evidence-based guidelines pre- and postimplementation of a multi-professional, evidence-based standardised care plan for stroke care in the electronic health record. Rapid and effective measures for patients with stroke or suspected stroke can limit the extent of damage; it is imperative that patients be observed, assessed and treated in accordance with evidence-based practice in hospital. Quantitative, comparative. Structured retrospective health record reviews were made prior to (n 60) and one and a half years after implementation (n 60) of a multi-professional evidence-based standardised care plan with a quality standard for stroke care in the electronic health record. Significant improvements were found in documentation of assessed vital signs, except for body temperature, Day 1 post compared with preimplementation. Documentation frequency regarding body temperature Day 1 and blood pressure and pulse Day 2 decreased post compared with preimplementation. Improvements were also detected in documented observations of patients' micturition capacity, swallowing capacity and mouth status and the proportion of physiotherapist-documented aid assessments. Observations of blood glucose, mobilisation ability and speech and communication ability were unchanged. An evidence-based standardised care plan in an electronic health record assists staff in improving documentation of health status assessments during the first days after a stroke diagnosis. Use of a standardised care plan seems to have the potential to help staff adhere to evidence-based patient care and, thereby, to increase patient safety. © 2015 John Wiley & Sons Ltd.
Makam, Anil N; Lanham, Holly J; Batchelor, Kim; Samal, Lipika; Moran, Brett; Howell-Stampley, Temple; Kirk, Lynne; Cherukuri, Manjula; Santini, Noel; Leykum, Luci K; Halm, Ethan A
2013-08-09
Despite considerable financial incentives for adoption, there is little evidence available about providers' use and satisfaction with key functions of electronic health records (EHRs) that meet "meaningful use" criteria. We surveyed primary care providers (PCPs) in 11 general internal medicine and family medicine practices affiliated with 3 health systems in Texas about their use and satisfaction with performing common tasks (documentation, medication prescribing, preventive services, problem list) in the Epic EHR, a common commercial system. Most practices had greater than 5 years of experience with the Epic EHR. We used multivariate logistic regression to model predictors of being a structured documenter, defined as using electronic templates or prepopulated dot phrases to document at least two of the three note sections (history, physical, assessment and plan). 146 PCPs responded (70%). The majority used free text to document the history (51%) and assessment and plan (54%) and electronic templates to document the physical exam (57%). Half of PCPs were structured documenters (55%) with family medicine specialty (adjusted OR 3.3, 95% CI, 1.4-7.8) and years since graduation (nonlinear relationship with youngest and oldest having lowest probabilities) being significant predictors. Nearly half (43%) reported spending at least one extra hour beyond each scheduled half-day clinic completing EHR documentation. Three-quarters were satisfied with documenting completion of pneumococcal vaccinations and half were satisfied with documenting cancer screening (57% for breast, 45% for colorectal, and 46% for cervical). Fewer were satisfied with reminders for overdue pneumococcal vaccination (48%) and cancer screening (38% for breast, 37% for colorectal, and 31% for cervical). While most believed the problem list was helpful (70%) and kept an up-to-date list for their patients (68%), half thought they were unreliable and inaccurate (51%). Dissatisfaction with and suboptimal use of key functions of the EHR may mitigate the potential for EHR use to improve preventive health and chronic disease management. Future work should optimize use of key functions and improve providers' time efficiency.
Prioritizing and Funding Nepal's Multisector Nutrition Plan.
Pomeroy-Stevens, Amanda; Shrestha, Madhukar B; Biradavolu, Monica; Hachhethu, Kusum; Houston, Robin; Sharma, Indu; Wun, Jolene
2016-12-01
Nepal has a long tradition of designing good multisectoral nutrition policy. However, success of policy implementation has varied. More evidence on how to successfully carry out multisector nutrition policy is needed. We tracked the influence of Nepal's multisectoral nutrition plan (MSNP) on the process of priority setting and budgeting from 2014 to 2016. This study used a mixed-method longitudinal design to track qualitative and budgetary changes related to MSNP processes nationally as well as in 3 districts. Qualitative changes in each study area were assessed through interviews, observation, news content, and meeting notes. Changes in allocations and expenditures were calculated based on budget documents, work plans, and validation interviews. Improved understanding of the MSNP was documented nationally and in study districts but not in VDCs. Human resources, ownership, bottom-up planning, coordination, advocacy, and sustainable structures all emerged as important factors within the enabling environment. Evidence suggests the MSNP influenced improvements in the last 3 factors. We also found notable increases in activities and financing for nutrition-allocations increased steadily between FY 2013-2014 and FY 2015-2016, and 28% of total nutrition allocations in the final year came from new or expanded MSNP-affiliated activities. Data from 3 districts highlight challenges linking local planning and budgeting to central-level structures. The MSNP appears to have strengthened the nutrition system in Nepal and increased priority and funding for nutrition. Next steps include strengthening linkages to the districts and below. Other countries can learn from the MSNP's success in increasing investment for nutrition. © The Author(s) 2016.
DOT National Transportation Integrated Search
2003-10-01
The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : WSDOT deployment". This document defines the objective, approach,...
Network Operations Support Plan for the Spot 2 mission (revision 1)
NASA Technical Reports Server (NTRS)
Werbitzky, Victor
1989-01-01
The purpose of this Network Operations Support Plan (NOSP) is to indicate operational procedures and ground equipment configurations for the SPOT 2 mission. The provisions in this document take precedence over procedures or configurations in other documents.
40 CFR 60.4355 - How do I establish and document a proper parameter monitoring plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... Standards of Performance for Stationary Combustion Turbines Monitoring § 60.4355 How do I establish and document a proper parameter monitoring plan? (a) The steam or water to fuel ratio or other parameters that...
Are care plans suitable for the management of multiple conditions?
Young, Charlotte E.; Boyle, Frances M.; Mutch, Allyson J.
2016-01-01
Background Care plans have been part of the primary care landscape in Australia for almost two decades. With an increasing number of patients presenting with multiple chronic conditions, it is timely to consider whether care plans meet the needs of patients and clinicians. Objectives To review and benchmark existing care plan templates that include recommendations for comorbid conditions, against four key criteria: (i) patient preferences, (ii) setting priorities, (iii) identifying conflicts and synergies between conditions, and (iv) setting dates for reviewing the care plan. Design Document analysis of Australian care plan templates published from 2006 to 2014 that incorporated recommendations for managing comorbid conditions in primary care. Results Sixteen templates were reviewed. All of the care plan templates addressed patient preference, but this was not done comprehensively. Only three templates included setting priorities. None assisted in identifying conflicts and synergies between conditions. Fifteen templates included setting a date for reviewing the care plan. Conclusions Care plans are a well-used tool in primary care practice, but their current format perpetuates a single-disease approach to care, which works contrary to their intended purpose. Restructuring care plans to incorporate shared decision-making and attention to patient preferences may assist in shifting the focus back to the patient and their care needs. PMID:29090181
Knowledge enabled plan of care and documentation prototype.
DaDamio, Rebecca; Gugerty, Brian; Kennedy, Rosemary
2006-01-01
There exist significant challenges in integrating the plan of care into documentation and point of care operational processes. A plan of care is often a static artifact that meets regulatory standards with limited influence on supporting goal-directed care delivery processes. Although this prototype is applicable to many clinical disciplines, we will highlight nursing processes in demonstrating a knowledge-driven computerized solution that fully integrates the plan of care within documentation. The knowledge-driven solution reflects evidenced-based practice; is an effective tool for managing problems, orders/interventions, and the patient's progress towards expected outcomes; meets regulatory standards; and drives quality and process improvement. The knowledge infrastructure consists of fully represented terminology, structured clinical expressions utilizing the controlled terminology and clinical knowledge representing evidence-based practice.
Westbrook, Johanna I; Ampt, Amanda; Kearney, Leanne; Rob, Marilyn I
2008-05-05
To quantify time doctors in hospital wards spend on specific work tasks, and with health professionals and patients. Observational time and motion study. 400-bed teaching hospital in Sydney. 19 doctors (seven registrars, five residents, seven interns) in four wards were observed between 08:30 and 19:00 for a total of 151 hours between July and December 2006. Proportions of time in categories of work; proportions of tasks performed with health professionals and patients; proportions of tasks using specific information tools; rates of multitasking and interruptions. The greatest proportions of doctors' time were in professional communication (33%; 95% CI, 29%-38%); social activities, such as non-work communication and meal breaks (17%; 95% CI, 13%-21%), and indirect care, such as planning care (17%; 95% CI, 15%-19%). Multitasking involved 20% of time, and on average, doctors were interrupted every 21 minutes. Most tasks were completed with another doctor (56%; 95% CI, 55%-57%), while 24% (95% CI, 23%-25%) were undertaken alone and 15% (95% CI, 15%-16%) with a patient. Interns spent more time completing documentation and administrative tasks, and less time in direct care than residents and registrars. The time interns spent documenting (22%) was almost double the time they were engaged in direct patient care. Two-thirds of doctors' time was consumed by three work categories: professional communication, social activities and indirect care. Doctors on wards are interrupted at considerably lower rates than those in emergency and intensive care units. The results confirm interns' previously reported dissatisfaction with their level of administrative work and documentation.
Vedula, S Swaroop; Li, Tianjing; Dickersin, Kay
2013-01-01
Details about the type of analysis (e.g., intent to treat [ITT]) and definitions (i.e., criteria for including participants in the analysis) are necessary for interpreting a clinical trial's findings. Our objective was to compare the description of types of analyses and criteria for including participants in the publication (i.e., what was reported) with descriptions in the corresponding internal company documents (i.e., what was planned and what was done). Trials were for off-label uses of gabapentin sponsored by Pfizer and Parke-Davis, and documents were obtained through litigation. For each trial, we compared internal company documents (protocols, statistical analysis plans, and research reports, all unpublished), with publications. One author extracted data and another verified, with a third person verifying discordant items and a sample of the rest. Extracted data included the number of participants randomized and analyzed for efficacy, and types of analyses for efficacy and safety and their definitions (i.e., criteria for including participants in each type of analysis). We identified 21 trials, 11 of which were published randomized controlled trials, and that provided the documents needed for planned comparisons. For three trials, there was disagreement on the number of randomized participants between the research report and publication. Seven types of efficacy analyses were described in the protocols, statistical analysis plans, and publications, including ITT and six others. The protocol or publication described ITT using six different definitions, resulting in frequent disagreements between the two documents (i.e., different numbers of participants were included in the analyses). Descriptions of analyses conducted did not agree between internal company documents and what was publicly reported. Internal company documents provide extensive documentation of methods planned and used, and trial findings, and should be publicly accessible. Reporting standards for randomized controlled trials should recommend transparent descriptions and definitions of analyses performed and which study participants are excluded.
Software Engineering Improvement Plan
NASA Technical Reports Server (NTRS)
2006-01-01
In performance of this task order, bd Systems personnel provided support to the Flight Software Branch and the Software Working Group through multiple tasks related to software engineering improvement and to activities of the independent Technical Authority (iTA) Discipline Technical Warrant Holder (DTWH) for software engineering. To ensure that the products, comments, and recommendations complied with customer requirements and the statement of work, bd Systems personnel maintained close coordination with the customer. These personnel performed work in areas such as update of agency requirements and directives database, software effort estimation, software problem reports, a web-based process asset library, miscellaneous documentation review, software system requirements, issue tracking software survey, systems engineering NPR, and project-related reviews. This report contains a summary of the work performed and the accomplishments in each of these areas.
NASA Technical Reports Server (NTRS)
Hanley, G.
1978-01-01
Three appendixes in support of Volume 7 are contained in this document. The three appendixes are: (1) Satellite Power System Work Breakdown Structure Dictionary; (2) SPS cost Estimating Relationships; and (3) Financial and Operational Concept. Other volumes of the final report that provide additional detail are: Executive Summary; SPS Systems Requirements; SPS Concept Evolution; SPS Point Design Definition; Transportation and Operations Analysis; and SPS Technology Requirements and Verification.
A Lunar Optical-Ultraviolet-Infrared Synthesis Array (LOUISA)
NASA Technical Reports Server (NTRS)
Burns, Jack O. (Editor); Johnson, Stewart W. (Editor); Duric, Nebojsa (Editor)
1992-01-01
This document contains papers presented at a workshop held to consider 'optical ultraviolet infrared' interferometric observations from the moon. Part 1 is an introduction. Part 2 is a description of current and planned ground-based interferometers. Part 3 is a description of potential space-based interferometers. Part 4 addresses the potential for interferometry on the moon. Part 5 is the report of the workshop's working groups. Concluding remarks, summary, and conclusions are presented in Part 6.
Space Station Induced Monitoring
NASA Technical Reports Server (NTRS)
Spann, James F. (Editor); Torr, Marsha R. (Editor)
1988-01-01
This report contains the results of a conference convened May 10-11, 1988, to review plans for monitoring the Space Station induced environment, to recommend primary components of an induced environment monitoring package, and to make recommendations pertaining to suggested modifications of the Space Station External Contamination Control Requirements Document JSC 30426. The contents of this report are divided as Follows: Monitoring Induced Environment - Space Station Work Packages Requirements, Neutral Environment, Photon Emission Environment, Particulate Environment, Surface Deposition/Contamination; and Contamination Control Requirements.
Software engineering project management - A state-of-the-art report
NASA Technical Reports Server (NTRS)
Thayer, R. H.; Lehman, J. H.
1977-01-01
The management of software engineering projects in the aerospace industry was investigated. The survey assessed such features as contract type, specification preparation techniques, software documentation required by customers, planning and cost-estimating, quality control, the use of advanced program practices, software tools and test procedures, the education levels of project managers, programmers and analysts, work assignment, automatic software monitoring capabilities, design and coding reviews, production times, success rates, and organizational structure of the projects.
1978-08-01
weeding I I ORGANISATION & MANAGEMENT Aims and objectives, staffing, promotional activities, identifying u;ers 12 NETWORKS & EXTERNAL SOURCES OF...Acquisition Clerks with typing capability are required for meticulous recordkeeping. Typing capability of 50 words per minute and a working knowledge ...81 Adminhistration and Management Includes management planning and research. 64 Numerical Analysis Includes iteration, difference equations, and 82
Trade study plan for Reusable Hydrogen Composite Tank System (RHCTS)
NASA Astrophysics Data System (ADS)
Greenberg, H. S.
1994-07-01
This TA 1 document describes the trade study plan (with support from TA 2) that will identify the most suitable structural configuration for an SSTO winged vehicle capable of delivering 25,000 lbs to a 220 nm circular orbit at 51.6 degree inclination. The analysis uses information derived in the TA 2 study as identified within the study plan. In view of this, for convenience, the TA 2 study plan is included as an appendix to this document.
Trade study plan for Reusable Hydrogen Composite Tank System (RHCTS)
NASA Technical Reports Server (NTRS)
Greenberg, H. S.
1994-01-01
This TA 1 document describes the trade study plan (with support from TA 2) that will identify the most suitable structural configuration for an SSTO winged vehicle capable of delivering 25,000 lbs to a 220 nm circular orbit at 51.6 degree inclination. The analysis uses information derived in the TA 2 study as identified within the study plan. In view of this, for convenience, the TA 2 study plan is included as an appendix to this document.
DOT National Transportation Integrated Search
2004-01-01
The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : state of Utah". This document defines the objective, approach, an...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-15
... Checklist: Medicaid Eligibility & Enrollment Systems--Advance Planning Document (E&E-APD); Use: Under... Eligibility/Enrollment Systems APD approval assignment. The information requested on the Checklist will be... an Expedited Checklist: Medicaid Eligibility & Enrollment Systems--Advance Planning Document (E& -APD...
An incentive plan for professional fee collections at an indigent-care teaching hospital.
Stewart, M G; Jones, D B; Garson, A T
2001-11-01
The authors describe the implementation and development of an incentive plan to improve professional fee collections at an indigent-care teaching hospital. They theorized that an incentive plan based on relative value unit (RVU) productivity would increase billings and collections of professional fees. Unique RVU targets were set for individual services based on the number of faculty full-time equivalents and average reported productivity for academic physicians by specialty. The incentive plan was based on the level of expected faculty billings, measured in RVUs, for each department. A "base + incentive" model was used, with the base budget being distributed monthly throughout the year, and the incentive held as a "withhold" to be paid at the year's end only if the billing target in RVUs was met. Additionally, a task force worked with physician billing office and the hospital to improve collections. In the first year after implementation of the system was in place, important increases were noted in total RVU productivity (30.5% over the previous year) and in collections (49.5% over the previous year). Sixteen of 23 departments exceeded their incentive targets, and it was possible to make distributions of professional fees to those departments, to be used within the hospital system to enhance clinical services. Moreover, the plan created an overall positive attitude toward billings and documentation of faculty activities. The authors believe that this kind of incentive plan will be increasingly important for academic faculty working in public hospital systems.