Sample records for work plan fwp

  1. THOR Field and Wave Processor - FWP

    NASA Astrophysics Data System (ADS)

    Soucek, Jan; Rothkaehl, Hanna; Balikhin, Michael; Zaslavsky, Arnaud; Nakamura, Rumi; Khotyaintsev, Yuri; Uhlir, Ludek; Lan, Radek; Yearby, Keith; Morawski, Marek; Winkler, Marek

    2016-04-01

    If selected, Turbulence Heating ObserveR (THOR) will become the first mission ever flown in space dedicated to plasma turbulence. The Fields and Waves Processor (FWP) is an integrated electronics unit for all electromagnetic field measurements performed by THOR. FWP will interface with all fields sensors: electric field antennas of the EFI instrument, the MAG fluxgate magnetometer and search-coil magnetometer (SCM) and perform data digitization and on-board processing. FWP box will house multiple data acquisition sub-units and signal analyzers all sharing a common power supply and data processing unit and thus a single data and power interface to the spacecraft. Integrating all the electromagnetic field measurements in a single unit will improve the consistency of field measurement and accuracy of time synchronization. The feasibility of making highly sensitive electric and magnetic field measurements in space has been demonstrated by Cluster (among other spacecraft) and THOR instrumentation complemented by a thorough electromagnetic cleanliness program will further improve on this heritage. Taking advantage of the capabilities of modern electronics, FWP will provide simultaneous synchronized waveform and spectral data products at high time resolution from the numerous THOR sensors, taking advantage of the large telemetry bandwidth of THOR. FWP will also implement a plasma a resonance sounder and a digital plasma quasi-thermal noise analyzer designed to provide high cadence measurements of plasma density and temperature complementary to data from particle instruments. FWP will be interfaced with the particle instrument data processing unit (PPU) via a dedicated digital link which will enable performing on board correlation between waves and particles, quantifying the transfer of energy between waves and particles. The FWP instrument shall be designed and built by an international consortium of scientific institutes from Czech Republic, Poland, France, UK, Sweden and Austria.

  2. THOR Fields and Wave Processor - FWP

    NASA Astrophysics Data System (ADS)

    Soucek, Jan; Rothkaehl, Hanna; Ahlen, Lennart; Balikhin, Michael; Carr, Christopher; Dekkali, Moustapha; Khotyaintsev, Yuri; Lan, Radek; Magnes, Werner; Morawski, Marek; Nakamura, Rumi; Uhlir, Ludek; Yearby, Keith; Winkler, Marek; Zaslavsky, Arnaud

    2017-04-01

    If selected, Turbulence Heating ObserveR (THOR) will become the first spacecraft mission dedicated to the study of plasma turbulence. The Fields and Waves Processor (FWP) is an integrated electronics unit for all electromagnetic field measurements performed by THOR. FWP will interface with all THOR fields sensors: electric field antennas of the EFI instrument, the MAG fluxgate magnetometer, and search-coil magnetometer (SCM), and perform signal digitization and on-board data processing. FWP box will house multiple data acquisition sub-units and signal analyzers all sharing a common power supply and data processing unit and thus a single data and power interface to the spacecraft. Integrating all the electromagnetic field measurements in a single unit will improve the consistency of field measurement and accuracy of time synchronization. The scientific value of highly sensitive electric and magnetic field measurements in space has been demonstrated by Cluster (among other spacecraft) and THOR instrumentation will further improve on this heritage. Large dynamic range of the instruments will be complemented by a thorough electromagnetic cleanliness program, which will prevent perturbation of field measurements by interference from payload and platform subsystems. Taking advantage of the capabilities of modern electronics and the large telemetry bandwidth of THOR, FWP will provide multi-component electromagnetic field waveforms and spectral data products at a high time resolution. Fully synchronized sampling of many signals will allow to resolve wave phase information and estimate wavelength via interferometric correlations between EFI probes. FWP will also implement a plasma resonance sounder and a digital plasma quasi-thermal noise analyzer designed to provide high cadence measurements of plasma density and temperature complementary to data from particle instruments. FWP will rapidly transmit information about magnetic field vector and spacecraft potential to the particle instrument data processing unit (PPU) via a dedicated digital link. This information will help particle instruments to optimize energy and angular sweeps and calculate on-board moments. FWP will also coordinate the acquisition of high resolution waveform snapshots with very high time resolution electron data from the TEA instrument. This combined wave/particle measurement will provide the ultimate dataset for investigation of wave-particle interactions on electron scales. The FWP instrument shall be designed and built by an international consortium of scientific institutes from Czech Republic, Poland, France, UK, Sweden and Austria.

  3. Influence of shade on the growth and nitrogen assimilation of developing fruits on bell pepper

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Achhireddy, N.R.; Fletcher, J.S.; Beevers, L.

    Accumulation of dry mass, total N, protein N, and soluble amino acid N in the developing fruit and seeds of bell pepper (Capsicum annuum L.) was determined at selected intervals following anthesis. The importance of photosynthesis to the growth and nitrogen (N) assimilation in the developing fruit wall plus placenta (FWP) and seeds was evaluated by comparing the growth and accumulation of reduced N in nonphotosynthetic and photosynthetic fruits (covered vs. uncovered). The growth rate of the FWP and seeds was similar under both conditions. After 65 days of growth, the fruits kept in the dark weighed about 15% lessmore » than those receiving illumination; seed weight was the same for both treatments. Total N content of the FWP or seed continued to increase up to 55 days after anthesis. The FWP accumulated over 90% of fruit's total N, and there were no significant differences between covered and uncovered fruits. Protein N accounted for about 50% of the total N present in both covered and uncovered fruits. 15 references, 2 figures, 2 tables.« less

  4. Rediscovering America: The FWP Legacy and Challenge

    ERIC Educational Resources Information Center

    Hirsch, Jerrold

    2012-01-01

    An overview of the history of the Federal Writers' Project, hitting on critical reference points for our vision of what the project might look like today: the 1930s' FWP's cross-disciplinary integration of literature and history; the rejection of strict divisions between high and low culture; and the bottom-up approach to history that had begun…

  5. 7 CFR 1410.11 - Farmable Wetlands Program.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... in FWP if the land is buffer acreage that provides protection for and is contiguous to land otherwise... (b)(4) of this section; or (4) A suitable buffer as determined by the Deputy Administrator for lands...

  6. 7 CFR 1410.11 - Farmable Wetlands Program.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... in FWP if the land is buffer acreage that provides protection for and is contiguous to land otherwise... (b)(4) of this section; or (4) A suitable buffer as determined by the Deputy Administrator for lands...

  7. 7 CFR 1410.11 - Farmable Wetlands Program.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... in FWP if the land is buffer acreage that provides protection for and is contiguous to land otherwise... (b)(4) of this section; or (4) A suitable buffer as determined by the Deputy Administrator for lands...

  8. Livestock and feed water productivity in the mixed crop-livestock system.

    PubMed

    Bekele, M; Mengistu, A; Tamir, B

    2017-10-01

    Recently with limited information from intensified grain-based farming systems in developed countries, livestock production is challenged as being huge consumer of freshwater. The smallholder mixed crop-livestock (MCL) system which is predominant in developing countries like Ethiopia, is maintained with considerable contributions of crop residues (CR) to livestock feeding. Inclusion of CR is expected to reduce the water requirement for feed production resulting improvement in livestock water productivity (LWP). This study was conducted to determine feed water productivity (FWP) and LWP in the MCL system. A multistage sampling procedure was followed to select farmers from different wealth status. Wealth status dictated by ownership of key farm resources such as size of cropland and livestock influenced the magnitude of livestock outputs, FWP and LWP. Significant difference in feed collected, freshwater evapotranspired, livestock outputs and water productivity (WP) were observed between wealth groups, where wealthier are relatively more advantaged. Water productivity of CR and grazing land (GL) analyzed separately showed contrasting differences where better-off gained more on CR, whereas vice versa on GL. These counterbalancing of variations may justify the non-significant difference in total FWP between wealth groups. Despite observed differences, low WP on GL indicates the need of interventions at all levels. The variation in WP of CR is attributed to availability of production factors which restrained the capacity of poor farmers most. A linear relationship between the proportion of CR in livestock feed and FWP was evident, but the relationship with LWP was not likely linear. As CR are inherently low in digestibility and nutritive values which have an effect on feed conversion into valuable livestock products and services, increasing share of CR beyond an optimum level is not a viable option to bring improvements in livestock productivity as expressed in terms of LWP. Ensuring land security, installing proper grazing management, improved forage seed supply and application of soil and water conservation are expected to enhance WP on GL. Given the relationship of production factors with crop biomass and associated WP, interventions targeted to improve provision of inputs, credit, extension and training support due emphasis to the poor would increase CR yield and reduce part of water use for feed production. Optimizing feed value of CR with treatment and supplementation, following water efficient forage production methods and maintenance of healthy productive animals are expected to amplify the benefits from livestock and eventually improve LWP.

  9. Northwest Montana Wildlife Habitat Enhancement: Hungry Horse Elk Mitigation Project: Monitoring and Evaluation Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Casey, Daniel; Malta, Patrick

    Portions of two important elk (Cervus elaphus) winter ranges totalling 8749 acres were lost due to the construction of the Hungry Horse Dam hydroelectric facility. This habitat loss decreased the carrying capacity of the both the elk and the mule deer (Odocoileus hemionus). In 1985, using funds from the Bonneville Power Administration (BPA) as authorized by the Northwest Power Act, the Montana Department of Fish, Wildlife and Parks (FWP) completed a wildlife mitigation plan for Hungry Horse Reservoir. This plan identified habitat enhancement of currently-occupied winter range as the most cost-efficient, easily implemented mitigation alternative available to address these large-scalemore » losses of winter range. The Columbia Basin Fish and Wildlife Program, as amended in 1987, authorized BPA to fund winter range enhancement to meet an adjusted goal of 133 additional elk. A 28-month advance design phase of the BPA-funded project was initiated in September 1987. Primary goals of this phase of the project included detailed literature review, identification of enhancement areas, baseline (elk population and habitat) data collection, and preparation of 3-year and 10-year implementation plans. This document will serve as a site-specific habitat and population monitoring plan which outlines our recommendations for evaluating the results of enhancement efforts against mitigation goals. 25 refs., 13 figs., 7 tabs.« less

  10. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Connor, Jason M.; McLellan, Jason G.; O'Connor, Dick

    In 1980, the United States Congress enacted the Northwest Power Planning and Conservation Act (PL 96-501, 1980), which established the Northwest Power Planning Council (NPPC). The NPPC was directed by Congress to develop a regional Power Plan and also the Columbia River Basin Fish and Wildlife Program (FWP) to restore or replace losses of fish caused by construction and operation of hydroelectric dams in the Columbia River Basin. In developing the FWP, Congress specifically directed NPPC to solicit recommendations for measures to be included in the Program from the region's fish and wildlife agencies and Indian tribes. All measures adoptedmore » by the Council were also required to be consistent with the management objectives of the agencies and tribes [Section 4.(h)(6)(A)], the legal rights of Indian tribes in the region [Section 4.(h)(6)(D)] and be based upon and supported by the best available scientific knowledge [Section 4.(h)(6)(B)]. The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, also known as the Joint Stock Assessment Project (JSAP) specifically addresses NPPC Council measure 10.8B.26 of the 1994 program. The Joint Stock Assessment Project is a management tool using ecosystem principles to manage artificial fish assemblages and native fish in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (Blocked Area). A three-phase approach of this project will enhance the fisheries resources of the Blocked Area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information is housed in a central location, allowing managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP is designed and guided jointly by fisheries managers in the Blocked Area and the Columbia Basin Blocked Area Management Plan (1998). The initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of Blocked Area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the Blocked Area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. Common collection and analytical methodologies were developed in 1999. In 1999, 2000, and 2001 the project began addressing some of the identified data gaps throughout the Blocked Area. Data collection of established projects and a variety of newly developed sampling projects are ongoing. Projects developed and undertaken by JSAP fisheries managers include investigations of the Pend Orielle River and its tributaries, the Little Spokane River and its tributaries, and water bodies within and near the Spokane Indian Reservation. Migration patterns of adfluvial and reservoir fish in Box Canyon Reservoir and its tributaries, a baseline assessment of Boundary Reservoir and its tributaries, ecological assessment of mountain lakes in Pend Oreille County, and assessments of seven streams and four lakes on the Spokane Indian Reservation were completed by 2000. Assessments of the Little Spokane River and its tributaries, tributaries to the Pend Oreille River, small lakes in southern Pend Oreille County, and water bodies within and near the Spokane Indian Reservation were conducted in 2001. This work was done in accordance with the scope of work approved by Bonneville Power Administration (BPA).« less

  11. FWP executive summaries: basic energy sciences materials sciences and engineering program (SNL/NM).

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Samara, George A.; Simmons, Jerry A.

    2006-07-01

    This report presents an Executive Summary of the various elements of the Materials Sciences and Engineering Program which is funded by the Division of Materials Sciences and Engineering, Office of Basic Energy Sciences, U.S. Department of Energy at Sandia National Laboratories, New Mexico. A general programmatic overview is also presented.

  12. Writing Democracy: Notes on a Federal Writers' Project for the 21st Century

    ERIC Educational Resources Information Center

    Carter, Shannon; Mutnick, Deborah

    2012-01-01

    A general overview of the Writing Democracy project, including its origin story and key objectives. Draws parallels between the historical context that gave rise to the New Deal's Federal Writers' Project and today, examining the potential for a reprise of FWP in community literacy and public rhetoric and introducing articles collected in this…

  13. THOR Fluxgate Magnetometer (MAG)

    NASA Astrophysics Data System (ADS)

    Nakamura, Rumi; Eastwood, Jonathan; Magnes, Werner; Valavanoglou, Aris; Carr, Christopher M.; O'Brien, Helen L.; Narita, Yasuhito; Delva, Magda; Chen, Christopher H. K.; Plaschke, Ferdinand; Soucek, Jan

    2016-04-01

    Turbulence Heating ObserveR (THOR) is the first mission ever flown in space dedicated to plasma turbulence. The goal of the Fluxgate Magnetometer (MAG) is to measure the DC to low frequency ambient magnetic field. The design of the magnetometer consists of two tri-axial sensors and the related magnetometer electronics; the electronics are hosted on printed circuit boards in the common electronics box of the fields and wave processor (FWP). A fully redundant two sensor system mounted on a common boom and the new miniaturized low noise design based on MMS and Solar Orbiter instruments enable accurate measurement throughout the region of interest for THOR science. The usage of the common electronics hosted by FWP guarantees to fulfill the required timing accuracy with other fields measurements. These improvements are important to obtain precise measurements of magnetic field, which is essential to estimate basic plasma parameters and correctly identify the spatial and temporal scales of the turbulence. Furthermore, THOR MAG provides high quality data with sufficient overlap with the Search Coil Magnetometer (SCM) in frequency space to obtain full coverage of the wave forms over all the frequencies necessary to obtain the full solar wind turbulence spectrum from MHD to kinetic range with sufficient accuracy.

  14. Identifying parasitic and saprotrophic interactions of freshwater chytrids with a microalga

    NASA Astrophysics Data System (ADS)

    Ward, C.; Longcore, J. E.; Carney, L. T.; Mayali, X.; Pett-Ridge, J.; Thelen, M. P.; Stuart, R.

    2016-12-01

    Despite having long been regarded as ecologically insignificant, aquatic fungi may be key regulators of carbon cycling in phytoplankton-dominated freshwater ecosystems. For several decades, it has been known that through infection chytrids and other parasitic fungi can cause major declines in natural algal populations and the release of large quantities of organic matter into the water column. Additionally, as in other environments fungi may be critically important in the decomposition of refractory organic matter, although to our knowledge this has never been investigated in pelagic freshwater ecosystems. We have a limited understanding of how fungi can interact with phytoplankton or phytoplankton-derived organic matter, and logistical difficulties complicate their study in the environment. Here, we have developed a model green alga-chytrid system to characterize the interactions under varying host physiologies and to investigate how these interactions influence the physiological and metabolic outcomes of both members. Chytrid infection was clearly linked to algal growth stage in the fungal isolate belonging to Rhizophydiales with infectivity only in late cyst stage, while the isolate belonging to Paraphysoderma could infect in both early and late cyst stages. To test whether freshwater chytrids can metabolize algal-derived organic matter, fungal isolates were grown axenically in algal spent media from different growth stages. The Rhizophydiales isolate grew on algal exudate from early cyst stage, while the Paraphysodermaisolate grew on exudates from both growth stages. Ongoing work has focused on using biochemical and multi-omic approaches to study the mechanistic underpinnings of algal-fungal interactions and to better understand the factors contributing to growth stage- and strain-specific differences. Together, these findings suggest that fungi may play a dual role in regulating carbon cycling in freshwater ecosystems via parasitic and saprotrophic strategies. This research was supported by the U.S. DOE Office of Science through the Office of Biological and Environmental Research under FWP SCW1039 and the Office of Energy Efficiency and Renewable Energy under FWP 29886. Work was performed under the auspices of the U.S. Department of Energy under Contract DE-AC52-07NA27344.

  15. A statistical retrieval of cloud parameters for the millimeter wave Ice Cloud Imager on board MetOp-SG

    NASA Astrophysics Data System (ADS)

    Prigent, Catherine; Wang, Die; Aires, Filipe; Jimenez, Carlos

    2017-04-01

    The meteorological observations from satellites in the microwave domain are currently limited to below 190 GHz. However, the next generation of European Organisation for the Exploitation of Meteorological Satellites (EUMETSAT) Polar System-Second Generation-EPS-SG will carry an instrument, the Ice Cloud Imager (ICI), with frequencies up to 664 GHz, to improve the characterization of the cloud frozen phase. In this paper, a statistical retrieval of cloud parameters for ICI is developed, trained on a synthetic database derived from the coupling of a mesoscale cloud model and radiative transfer calculations. The hydrometeor profiles simulated with the Weather Research and Forecasting model (WRF) for twelve diverse European mid-latitude situations are used to simulate the brightness temperatures with the Atmospheric Radiative Transfer Simulator (ARTS) to prepare the retrieval database. The WRF+ARTS simulations have been compared to the Special Sensor Microwave Imager/Sounder (SSMIS) observations up to 190 GHz: this successful evaluation gives us confidence in the simulations at the ICI channels from 183 to 664 GHz. Statistical analyses have been performed on this simulated retrieval database, showing that it is not only physically realistic but also statistically satisfactory for retrieval purposes. A first Neural Network (NN) classifier is used to detect the cloud presence. A second NN is developed to retrieve the liquid and ice integrated cloud quantities over sea and land separately. The detection and retrieval of the hydrometeor quantities (i.e., ice, snow, graupel, rain, and liquid cloud) are performed with ICI-only, and with ICI combined with observations from the MicroWave Imager (MWI, with frequencies from 19 to 190 GHz, also on board MetOp-SG). The ICI channels have been optimized for the detection and quantification of the cloud frozen phases: adding the MWI channels improves the performance of the vertically integrated hydrometeor contents, especially for the cloud liquid phases. The relative error for the retrieved integrated frozen water content (FWP, i.e., ice+snow+graupel) is below 40% for 0.1kg/m2 < FWP < 0.5kg/m2 and below 20% for FWP > 0.5 kg/m2.

  16. Resident Fish Stock above Chief Joseph and Grand Coulee Dams; 2003-2004 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Connor, Jason M.; McLellan, Jason G.; Butler, Chris

    2005-11-01

    In 1980, the United States Congress enacted the Northwest Power Planning and Conservation Act (PL 96-501, 1980), which established the Northwest Power and Conservation Council (NPCC), formerly the Northwest Power Planning Council. The NPCC was directed by Congress to develop a regional Power Plan and also the Columbia River Basin Fish and Wildlife Program (FWP) to restore or replace losses of fish caused by construction and operation of hydroelectric dams in the Columbia River Basin. In developing the FWP, Congress specifically directed NPCC to solicit recommendations for measures to be included in the Program from the region's fish and wildlifemore » agencies and Indian tribes. All measures adopted by the Council were also required to be consistent with the management objectives of the agencies and tribes [Section 4.(h)(6)(A)], the legal rights of Indian tribes in the region [Section 4.(h)(6)(D)] and be based upon and supported by the best available scientific knowledge [Section 4.(h)(6)(B)]. The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, also known as the Joint Stock Assessment Project (JSAP) specifically addresses NPPC Council measure 10.8B.26 of the 1994 program. The Joint Stock Assessment Project is a management tool using ecosystem principles to manage artificial and native fish assemblages in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (Blocked Area). A three-phase approach of this project will enhance the fisheries resources of the Blocked Area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information is housed in a central location, allowing managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP is designed and guided jointly by fisheries managers in the Blocked Area. The initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of Blocked Area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the Blocked Area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. Common collection and analytical methodologies were developed in 1999. The project began addressing identified data gaps throughout the Blocked Area in 1999. Data collection of established projects and a variety of newly developed sampling projects are ongoing. Projects developed and undertaken by JSAP fisheries managers include investigations of the Pend Orielle River and its tributaries, the Little Spokane River and its tributaries, and water bodies within and near the Spokane Indian Reservation. Migration patterns of adfluvial and reservoir fish in Box Canyon Reservoir and its tributaries, a baseline assessment of Boundary Reservoir and its tributaries, ecological assessment of mountain lakes in Pend Oreille County, and assessments of streams and lakes on the Spokane Indian Reservation were completed by 2001. Assessments of the Little Spokane River and its tributaries, Spokane River below Spokane Falls, tributaries to the Pend Oreille River, small lakes in Pend Oreille County, WA, and water bodies within and near the Spokane Indian Reservation were conducted in 2002 and 2003. This work was done in accordance with the scope of work approved by Bonneville Power Administration (BPA).« less

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Connor, Jason M.; McLellan, Jason G.; Butler, Chris

    In 1980, the United States Congress enacted the Northwest Power Planning and Conservation Act (PL 96-501, 1980), which established the Northwest Power and Conservation Council (NPCC), formerly the Northwest Power Planning Council. The NPCC was directed by Congress to develop a regional Power Plan and also the Columbia River Basin Fish and Wildlife Program (FWP) to restore or replace losses of fish caused by construction and operation of hydroelectric dams in the Columbia River Basin. In developing the FWP, Congress specifically directed NPCC to solicit recommendations for measures to be included in the Program from the region's fish and wildlifemore » agencies and Indian tribes. All measures adopted by the Council were also required to be consistent with the management objectives of the agencies and tribes [Section 4.(h)(6)(A)], the legal rights of Indian tribes in the region [Section 4.(h)(6)(D)] and be based upon and supported by the best available scientific knowledge [Section 4.(h)(6)(B)]. The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, also known as the Joint Stock Assessment Project (JSAP) specifically addresses NPPC Council measure 10.8B.26 of the 1994 program. The Joint Stock Assessment Project is a management tool using ecosystem principles to manage artificial fish assemblages and native fish in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (Blocked Area). A three-phase approach of this project will enhance the fisheries resources of the Blocked Area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information is housed in a central location, allowing managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP is designed and guided jointly by fisheries managers in the Blocked Area. The initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of Blocked Area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the Blocked Area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. Common collection and analytical methodologies were developed in 1999. In 1999, 2000, and 2001 the project began addressing some of the identified data gaps throughout the Blocked Area. Data collection of established projects and a variety of newly developed sampling projects are ongoing. Projects developed and undertaken by JSAP fisheries managers include investigations of the Pend Orielle River and its tributaries, the Little Spokane River and its tributaries, and water bodies within and near the Spokane Indian Reservation. Migration patterns of adfluvial and reservoir fish in Box Canyon Reservoir and its tributaries, a baseline assessment of Boundary Reservoir and its tributaries, ecological assessment of mountain lakes in Pend Oreille County, and assessments of streams and lakes on the Spokane Indian Reservation were completed by 2001. Assessments of the Little Spokane River and its tributaries, tributaries to the Pend Oreille River, small lakes in Pend Oreille County, WA, and water bodies within and near the Spokane Indian Reservation were conducted in 2002. This work was done in accordance with the scope of work approved by Bonneville Power Administration (BPA).« less

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Connor, Jason M.; McLellan, Jason G.; Butler, Chris

    In 1980, the United States Congress enacted the Northwest Power Planning and Conservation Act (PL 96-501, 1980), which established the Northwest Power and Conservation Council (NPCC), formerly the Northwest Power Planning Council. The NPCC was directed by Congress to develop a regional Power Plan and also the Columbia River Basin Fish and Wildlife Program (FWP) to restore or replace losses of fish caused by construction and operation of hydroelectric dams in the Columbia River Basin. In developing the FWP, Congress specifically directed NPCC to solicit recommendations for measures to be included in the Program from the region's fish and wildlifemore » agencies and Indian tribes. All measures adopted by the Council were also required to be consistent with the management objectives of the agencies and tribes [Section 4.(h)(6)(A)], the legal rights of Indian tribes in the region [Section 4.(h)(6)(D)] and be based upon and supported by the best available scientific knowledge [Section 4.(h)(6)(B)]. The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, also known as the Joint Stock Assessment Project (JSAP) specifically addresses NPPC Council measure 10.8B.26 of the 1994 program. The Joint Stock Assessment Project is a management tool using ecosystem principles to manage artificial and native fish assemblages in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (Blocked Area). A three-phase approach of this project will enhance the fisheries resources of the Blocked Area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information is housed in a central location, allowing managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP is designed and guided jointly by fisheries managers in the Blocked Area. The initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of Blocked Area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the Blocked Area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. Common collection and analytical methodologies were developed in 1999. The project began addressing identified data gaps throughout the Blocked Area in 1999. Data collection of established projects and a variety of newly developed sampling projects are ongoing. Projects developed and undertaken by JSAP fisheries managers include investigations of the Pend Orielle River and its tributaries, the Little Spokane River and its tributaries, and water bodies within and near the Spokane Indian Reservation. Migration patterns of adfluvial and reservoir fish in Box Canyon Reservoir and its tributaries, a baseline assessment of Boundary Reservoir and its tributaries, ecological assessment of mountain lakes in Pend Oreille County, and assessments of streams and lakes on the Spokane Indian Reservation were completed by 2001. Assessments of the Little Spokane River and its tributaries, Spokane River below Spokane Falls, tributaries to the Pend Oreille River, small lakes in Pend Oreille County, WA, and water bodies within and near the Spokane Indian Reservation were conducted in 2002 and 2003. This work was done in accordance with the scope of work approved by Bonneville Power Administration (BPA).« less

  19. Numerical heating in Particle-In-Cell simulations with Monte Carlo binary collisions

    NASA Astrophysics Data System (ADS)

    Alves, E. Paulo; Mori, Warren; Fiuza, Frederico

    2017-10-01

    The binary Monte Carlo collision (BMCC) algorithm is a robust and popular method to include Coulomb collision effects in Particle-in-Cell (PIC) simulations of plasmas. While a number of works have focused on extending the validity of the model to different physical regimes of temperature and density, little attention has been given to the fundamental coupling between PIC and BMCC algorithms. Here, we show that the coupling between PIC and BMCC algorithms can give rise to (nonphysical) numerical heating of the system, that can be far greater than that observed when these algorithms operate independently. This deleterious numerical heating effect can significantly impact the evolution of the simulated system particularly for long simulation times. In this work, we describe the source of this numerical heating, and derive scaling laws for the numerical heating rates based on the numerical parameters of PIC-BMCC simulations. We compare our theoretical scalings with PIC-BMCC numerical experiments, and discuss strategies to minimize this parasitic effect. This work is supported by DOE FES under FWP 100237 and 100182.

  20. Association Study Reveals Novel Genes Related to Yield and Quality of Fruit in Cape Gooseberry (Physalis peruviana L.).

    PubMed

    García-Arias, Francy L; Osorio-Guarín, Jaime A; Núñez Zarantes, Victor M

    2018-01-01

    Association mapping has been proposed as an efficient approach to assist plant breeding programs to investigate the genetic basis of agronomic traits. In this study, we evaluated 18 traits related to yield, (FWP, NF, FWI, and FWII), fruit size-shape (FP, FA, MW, WMH, MH, HMW, DI, FSI, FSII, OVO, OBO), and fruit quality (FIR, CF, and SST), in a diverse collection of 100 accessions of Physalis peruviana including wild, landraces, and anther culture derived lines. We identified seven accessions with suitable traits: fruit weight per plant (FWP) > 7,000 g/plant and cracked fruits (CF) < 4%, to be used as parents in cape gooseberry breeding program. In addition, the accessions were also characterized using Genotyping By Sequencing (GBS). We discovered 27,982 and 36,142 informative SNP markers based on the alignment against the two cape gooseberry references transcriptomes. Besides, 30,344 SNPs were identified based on alignment to the tomato reference genome. Genetic structure analysis showed that the population could be divided into two or three sub-groups, corresponding to landraces-anther culture and wild accessions for K = 2 and wild, landraces, and anther culture plants for K = 3. Association analysis was carried out using a Mixed Linear Model (MLM) and 34 SNP markers were significantly associated. These results reveal the basis of the genetic control of important agronomic traits and may facilitate marker-based breeding in P. peruviana .

  1. Association Study Reveals Novel Genes Related to Yield and Quality of Fruit in Cape Gooseberry (Physalis peruviana L.)

    PubMed Central

    García-Arias, Francy L.; Osorio-Guarín, Jaime A.; Núñez Zarantes, Victor M.

    2018-01-01

    Association mapping has been proposed as an efficient approach to assist plant breeding programs to investigate the genetic basis of agronomic traits. In this study, we evaluated 18 traits related to yield, (FWP, NF, FWI, and FWII), fruit size-shape (FP, FA, MW, WMH, MH, HMW, DI, FSI, FSII, OVO, OBO), and fruit quality (FIR, CF, and SST), in a diverse collection of 100 accessions of Physalis peruviana including wild, landraces, and anther culture derived lines. We identified seven accessions with suitable traits: fruit weight per plant (FWP) > 7,000 g/plant and cracked fruits (CF) < 4%, to be used as parents in cape gooseberry breeding program. In addition, the accessions were also characterized using Genotyping By Sequencing (GBS). We discovered 27,982 and 36,142 informative SNP markers based on the alignment against the two cape gooseberry references transcriptomes. Besides, 30,344 SNPs were identified based on alignment to the tomato reference genome. Genetic structure analysis showed that the population could be divided into two or three sub-groups, corresponding to landraces-anther culture and wild accessions for K = 2 and wild, landraces, and anther culture plants for K = 3. Association analysis was carried out using a Mixed Linear Model (MLM) and 34 SNP markers were significantly associated. These results reveal the basis of the genetic control of important agronomic traits and may facilitate marker-based breeding in P. peruviana. PMID:29616069

  2. Solving The Longstanding Problem Of Low-Energy Nuclear Reactions At the Highest Microscopic Level - Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Quaglioni, S.

    2016-09-22

    A 2011 DOE-NP Early Career Award (ECA) under Field Work Proposal (FWP) SCW1158 supported the project “Solving the Long-Standing Problem of Low-Energy Nuclear Reactions at the Highest Microscopic Level” in the five-year period from June 15, 2011 to June 14, 2016. This project, led by PI S. Quaglioni, aimed at developing a comprehensive and computationally efficient framework to arrive at a unified description of structural properties and reactions of light nuclei in terms of constituent protons and neutrons interacting through nucleon-nucleon (NN) and three-nucleon (3N) forces. Specifically, the project had three main goals: 1) arriving at the accurate predictions formore » fusion reactions that power stars and Earth-based fusion facilities; 2) realizing a comprehensive description of clustering and continuum effects in exotic nuclei, including light Borromean systems; and 3) achieving fundamental understanding of the role of the 3N force in nuclear reactions and nuclei at the drip line.« less

  3. THOR Fluxgate Magnetometer (MAG)

    NASA Astrophysics Data System (ADS)

    Nakamura, Rumi; Eastwood, Jonathan; Magnes, Werner; Carr, Christopher, M.; O'Brien, Helen, L.; Narita, Yasuhito; K, Chen, Christopher H.; Berghofer, Gerhard; Valavanoglou, Aris; Delva, Magda; Plaschke, Ferdinand; Cupido, Emanuele; Soucek, Jan

    2017-04-01

    Turbulence Heating ObserveR (THOR) is the first mission ever flown in space dedicated to plasma turbulence. The fluxgate Magnetometer (MAG) measures the background to low frequency magnetic field. The high sensitivity measurements of MAG enable to characterize the nature of turbulent fluctuations as well as the large-scale context. MAG will provide the reference system for determining anisotropy of field fluctuations, pitch-angle and gyro-phase of particles. The design of the magnetometer consists of two tri-axial sensors and the related magnetometer electronics; the electronics are hosted on printed circuit boards in the common electronics box of the fields and wave processor (FWP). A fully redundant two- sensor system mounted on a common boom and the new miniaturized low noise design based on MMS and Solar Orbiter instruments enable accurate measurement throughout the region of interest for THOR science. The usage of the common electronics hosted by FWP guarantees to fulfill the required timing accuracy with other fields measurements. These improvements are important to obtain precise measurements of magnetic field, which is essential to estimate basic plasma parameters and correctly identify the spatial and temporal scales of the turbulence. Furthermore, THOR MAG provides high quality data with sufficient overlap with the Search Coil Magnetometer (SCM) in frequency space to obtain full coverage of the wave forms over all the frequencies necessary to obtain the full solar wind turbulence spectrum from MHD to kinetic range with sufficient accuracy. We discuss the role of MAG in THOR key science questions and present the new developments during Phase A such as the finalised instrument design, MAG relevant requirement, and new calibraion schemes.

  4. Assessment of the Accountability and Control of Arms, Ammunition, and Explosives (AA&E) Provided to the Security Forces of Afghanistan

    DTIC Science & Technology

    2009-09-11

    Corps to verify weapons and ammunition accountability. It conducted a serial number inventory of 67 weapons, including ten M16 rifles, 40 AK47 ...11. Mossberg M590A1 pump 12 gauge Former Warsaw Pact Weapons (FWP) 1. AK47 rifle and variants ( AK47 , AK74, AMD65, VZ58, AKMS) 2. RPK light machine...recorded as EL 4910  AK47 : 30 counted o Serial No. IA0499 recorded as IA0489  VZ58: 90 counted o 2 weapons were in the wrong boxes

  5. Visualization of the ultrafast structural phase transitions in warm dense matter

    NASA Astrophysics Data System (ADS)

    Mo, Mianzhen

    2017-10-01

    It is still a great challenge to obtain real-time atomistic-scale information on the structural phase transitions that lead to warm dense matter state. Recent advances in ultrafast electron diffraction (UED) techniques have opened up exciting prospects to unravel the mechanisms of solid-liquid phase transitions under these extreme non-equilibrium conditions. Here we report on precise measurements of melt time dependency on laser excitation energy density that resolve for the first time the transition from heterogeneous to homogeneous melting. This transition appears in both polycrystalline and single-crystal gold nanofilms with distinct measurable differences. These results test predictions from molecular-dynamics simulations with different interatomic potential models. These data further deliver accurate structure factor data to large wavenumbers that allow us to constrain electron-ion equilibration constants. Our results demonstrate electron-phonon coupling strength much weaker than DFT calculations, and contrary to previous results, provide evidence for bond softening. This work is supported by DOE Office of Science, Fusion Energy Science under FWP 100182, and the DOE BES Accelerator and Detector R&D program.

  6. Turbulent Dynamo Amplification of Magnetic Fields in Laser-Produced Plasmas: Simulations and Experiments

    NASA Astrophysics Data System (ADS)

    Tzeferacos, P.; Rigby, A.; Bott, A.; Bell, A.; Bingham, R.; Casner, A.; Cattaneo, F.; Churazov, E.; Forest, C.; Katz, J.; Koenig, M.; Li, C.-K.; Meinecke, J.; Petrasso, R.; Park, H.-S.; Remington, B.; Ross, J.; Ryutov, D.; Ryu, D.; Reville, B.; Miniati, F.; Schekochihin, A.; Froula, D.; Lamb, D.; Gregori, G.

    2017-10-01

    The universe is permeated by magnetic fields, with strengths ranging from a femtogauss in the voids between the filaments of galaxy clusters to several teragauss in black holes and neutron stars. The standard model for cosmological magnetic fields is the nonlinear amplification of seed fields via turbulent dynamo. We have conceived experiments to demonstrate and study the turbulent dynamo mechanism in the laboratory. Here, we describe the design of these experiments through large-scale 3D FLASH simulations on the Mira supercomputer at ANL, and the laser-driven experiments we conducted with the OMEGA laser at LLE. Our results indicate that turbulence is capable of rapidly amplifying seed fields to near equipartition with the turbulent fluid motions. This work was supported in part from the ERC (FP7/2007-2013, No. 256973 and 247039), and the U.S. DOE, Contract No. B591485 to LLNL, FWP 57789 to ANL, Grant No. DE-NA0002724 and DE-SC0016566 to the University of Chicago, and DE-AC02-06CH11357 to ANL.

  7. Lattice Stability and Interatomic Potential of Non-equilibrium Warm Dense Gold

    NASA Astrophysics Data System (ADS)

    Chen, Z.; Mo, M.; Soulard, L.; Recoules, V.; Hering, P.; Tsui, Y. Y.; Ng, A.; Glenzer, S. H.

    2017-10-01

    Interatomic potential is central to the calculation and understanding of the properties of matter. A manifestation of interatomic potential is lattice stability in the solid-liquid transition. Recently, we have used frequency domain interferometry (FDI) to study the disassembly of ultrafast laser heated warm dense gold nanofoils. The FDI measurement is implemented by a spatial chirped single-shot technique. The disassembly of the sample is characterized by the change in phase shift of the reflected probe resulted from hydrodynamic expansion. The experimental data is compared with the results of two-temperature molecular dynamic simulations based on a highly optimized embedded-atom-method (EAM) interatomic potential. Good agreement is found for absorbed energy densities of 0.9 to 4.3MJ/kg. This provides the first demonstration of the applicability of an EAM interatomic potential in the non-equilibrium warm dense matter regime. The MD simulations also reveal the critical role of pressure waves in solid-liquid transition in ultrafast laser heated nanofoils. This work is supported by DOE Office of Science, Fusion Energy Science under FWP 100182, and SLAC LDRD program.

  8. Mitigation for the Construction and Operation of Libby Dam, 2003-2004 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dunnigan, James; DeShazer, Jay; Garrow, Larry

    2004-06-01

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determinemore » the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan. Montana FWP uses a combination of diverse techniques to collect a variety of physical and biological data within the Kootenai River Basin. These data serve several purposes including: the development and refinement of models used in management of water resources and operation of Libby Dam; investigations into the limiting factors of native fish populations, gathering basic life history information, tracking trends in endangered, threatened species, and the assessment of restoration or management activities intended to restore native fishes and their habitats.« less

  9. Yakima/Klickitat Fisheries Project Monitoring and Evaluation, Final Report For the Performance Period May 1, 2008 through April 30, 2009.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sampson, Melvin R.

    2009-07-30

    The Yakima-Klickitat Fisheries Project (YKFP) is a joint project of the Yakama Nation (lead entity) and the Washington State Department of Fish and Wildlife (WDFW) and is sponsored in large part by the Bonneville Power Administration (BPA) with oversight and guidance from the Northwest Power and Conservation Council (NPCC). It is among the largest and most complex fisheries management projects in the Columbia Basin in terms of data collection and management, physical facilities, habitat enhancement and management, and experimental design and research on fisheries resources. Using principles of adaptive management, the YKFP is attempting to evaluate all stocks historically presentmore » in the Yakima subbasin and apply a combination of habitat restoration and hatchery supplementation or reintroduction, to restore the Yakima Subbasin ecosystem with sustainable and harvestable populations of salmon, steelhead and other at-risk species. The original impetus for the YKFP resulted from the landmark fishing disputes of the 1970s, the ensuing legal decisions in United States versus Washington and United States versus Oregon, and the region's realization that lost natural production needed to be mitigated in upriver areas where these losses primarily occurred. The YKFP was first identified in the NPCC's 1982 Fish and Wildlife Program (FWP) and supported in the U.S. v Oregon 1988 Columbia River Fish Management Plan (CRFMP). A draft Master Plan was presented to the NPCC in 1987 and the Preliminary Design Report was presented in 1990. In both circumstances, the NPCC instructed the Yakama Nation, WDFW and BPA to carry out planning functions that addressed uncertainties in regard to the adequacy of hatchery supplementation for meeting production objectives and limiting adverse ecological and genetic impacts. At the same time, the NPCC underscored the importance of using adaptive management principles to manage the direction of the Project. The 1994 FWP reiterated the importance of proceeding with the YKFP because of the added production and learning potential the project would provide. The YKFP is unique in having been designed to rigorously test the efficacy of hatchery supplementation. Given the current dire situation of many salmon and steelhead stocks, and the heavy reliance on artificial propagation as a recovery tool, YKFP monitoring results will have great region-wide significance. Supplementation is envisioned as a means to enhance and sustain the abundance of wild and naturally-spawning populations at levels exceeding the cumulative mortality burden imposed on those populations by habitat degradation and by natural cycles in environmental conditions. A supplementation hatchery is properly operated as an adjunct to the natural production system in a watershed. By fully integrating the hatchery with a naturally-producing population, high survival rates for the component of the population in the hatchery can raise the average abundance of the total population (hatchery component + naturally-producing component) to a level that compensates for the high mortalities imposed by human development activities and fully seeds the natural environment. The objectives of the YKFP are to: use Ecosystem Diagnosis and Treatment (EDT) and other modeling tools to facilitate planning for project activities, enhance existing stocks, re-introduce extirpated stocks, protect and restore habitat in the Yakima Subbasin, and operate using a scientifically rigorous process that will foster application of the knowledge gained about hatchery supplementation and habitat restoration throughout the Columbia River Basin. The YKFP is still in the early stages of evaluation, and as such the data and findings presented in this report should be considered preliminary until results are published in the peer-reviewed literature. The following is a brief summary of current YKFP activities by species.« less

  10. Studying astrophysical particle acceleration with laser-driven plasmas

    NASA Astrophysics Data System (ADS)

    Fiuza, Frederico

    2016-10-01

    The acceleration of non-thermal particles in plasmas is critical for our understanding of explosive astrophysical phenomena, from solar flares to gamma ray bursts. Particle acceleration is thought to be mediated by collisionless shocks and magnetic reconnection. The microphysics underlying these processes and their ability to efficiently convert flow and magnetic energy into non-thermal particles, however, is not yet fully understood. By performing for the first time ab initio 3D particle-in-cell simulations of the interaction of both magnetized and unmagnetized laser-driven plasmas, it is now possible to identify the optimal parameters for the study of particle acceleration in the laboratory relevant to astrophysical scenarios. It is predicted for the Omega and NIF laser conditions that significant non-thermal acceleration can occur during magnetic reconnection of laser-driven magnetized plasmas. Electrons are accelerated by the electric field near the X-points and trapped in contracting magnetic islands. This leads to a power-law tail extending to nearly a hundred times the thermal energy of the plasma and that contains a large fraction of the magnetic energy. The study of unmagnetized interpenetrating plasmas also reveals the possibility of forming collisionless shocks mediated by the Weibel instability on NIF. Under such conditions, both electrons and ions can be energized by scattering out of the Weibel-mediated turbulence. This also leads to power-law spectra that can be detected experimentally. The resulting experimental requirements to probe the microphysics of plasma particle acceleration will be discussed, paving the way for the first experiments of these important processes in the laboratory. As a result of these simulations and theoretical analysis, there are new experiments being planned on the Omega, NIF, and LCLS laser facilities to test these theoretical predictions. This work was supported by the SLAC LDRD program and DOE Office of Science, Fusion Energy Science (FWP 100182).

  11. Ultrafast visualization of the structural evolution of dense hydrogen towards warm dense matter

    NASA Astrophysics Data System (ADS)

    Fletcher, Luke

    2016-10-01

    Hot dense hydrogen far from equilibrium is ubiquitous in nature occurring during some of the most violent and least understood events in our universe such as during star formation, supernova explosions, and the creation of cosmic rays. It is also a state of matter important for applications in inertial confinement fusion research and in laser particle acceleration. Rapid progress occurred in recent years characterizing the high-pressure structural properties of dense hydrogen under static or dynamic compression. Here, we show that spectrally and angularly resolved x-ray scattering measure the thermodynamic properties of dense hydrogen and resolve the ultrafast evolution and relaxation towards thermodynamic equilibrium. These studies apply ultra-bright x-ray pulses from the Linac Coherent Light (LCLS) source. The interaction of rapidly heated cryogenic hydrogen with a high-peak power optical laser is visualized with intense LCLS x-ray pulses in a high-repetition rate pump-probe setting. We demonstrate that electron-ion coupling is affected by the small number of particles in the Debye screening cloud resulting in much slower ion temperature equilibration than predicted by standard theory. This work was supported by the DOE Office of Science, Fusion Energy Science under FWP 100182.

  12. Characterization of >100 T magnetic fields associated with relativistic Weibel instability in laser-produced plasmas

    NASA Astrophysics Data System (ADS)

    Mishra, Rohini; Ruyer, Charles; Goede, Sebastian; Roedel, Christian; Gauthier, Maxence; Zeil, Karl; Schramm, Ulrich; Glenzer, Siegfried; Fiuza, Frederico

    2016-10-01

    Weibel-type instabilities can occur in weakly magnetized and anisotropic plasmas of relevance to a wide range of astrophysical and laboratory scenarios. It leads to the conversion of a significant fraction of the kinetic energy of the plasma into magnetic energy. We will present a detailed numerical study, using 2D and 3D PIC simulations of the Weibel instability in relativistic laser-solid interactions. In this case, the instability develops due to the counter-streaming of laser-heated electrons and the background return current. We show that the growth rate of the instability is maximized near the critical density region on the rear side of the expanded plasma, producing up to 400 MG magnetic fields for Hydrogen plasmas. We have found that this strong field can be directly probed by energetic protons accelerated in rear side of the plasma by Target Normal Sheath Acceleration (TNSA). This allows the experimental characterization of the instability from the analysis of the spatial modulation of the detected protons. Our numerical results are compared with recent laser experiments with Hydrogen jets and show good agreement with the proton modulations observed experimentally. This work was supported by the DOE Office of Science, Fusion Energy Science (FWP 100182).

  13. Additions and improvements to the high energy density physics capabilities in the FLASH code

    NASA Astrophysics Data System (ADS)

    Lamb, D.; Bogale, A.; Feister, S.; Flocke, N.; Graziani, C.; Khiar, B.; Laune, J.; Tzeferacos, P.; Walker, C.; Weide, K.

    2017-10-01

    FLASH is an open-source, finite-volume Eulerian, spatially-adaptive radiation magnetohydrodynamics code that has the capabilities to treat a broad range of physical processes. FLASH performs well on a wide range of computer architectures, and has a broad user base. Extensive high energy density physics (HEDP) capabilities exist in FLASH, which make it a powerful open toolset for the academic HEDP community. We summarize these capabilities, emphasizing recent additions and improvements. We describe several non-ideal MHD capabilities that are being added to FLASH, including the Hall and Nernst effects, implicit resistivity, and a circuit model, which will allow modeling of Z-pinch experiments. We showcase the ability of FLASH to simulate Thomson scattering polarimetry, which measures Faraday due to the presence of magnetic fields, as well as proton radiography, proton self-emission, and Thomson scattering diagnostics. Finally, we describe several collaborations with the academic HEDP community in which FLASH simulations were used to design and interpret HEDP experiments. This work was supported in part at U. Chicago by DOE NNSA ASC through the Argonne Institute for Computing in Science under FWP 57789; DOE NNSA under NLUF Grant DE-NA0002724; DOE SC OFES Grant DE-SC0016566; and NSF Grant PHY-1619573.

  14. Two-temperature equilibration in warm dense hydrogen measured with x-ray scattering from the LCLS

    NASA Astrophysics Data System (ADS)

    Fletcher, Luke; High Energy Density Sciences Collaboration

    2017-10-01

    Understanding the properties of warm dense hydrogen plasmas is critical for modeling stellar and planetary interiors, as well as for inertial confinement fusion (ICF) experiments. Of central importance are the electron-ion collision and equilibration times that determine the microscopic properties in a high energy density state. Spectrally and angularly resolved x-ray scattering measurements from fs-laser heated hydrogen have resolved the picosecond evolution and energy relaxation from a two-temperature plasma towards thermodynamic equilibrium in the warm dense matter regime. The interaction of rapidly heated cryogenic hydrogen irradiated by a 400 nm, 5x1017 W/cm2 , 70 fs-laser is visualized with ultra-bright 5.5 kev x-ray pulses from the Linac Coherent Light (LCLS) source in 1 Hz repetition rate pump-probe setting. We demonstrate that the energy relaxation is faster than many classical binary collision theories that use ad hoc cutoff parameters used in the Landau-Spitzer determination of the Coulomb logarithm. This work was supported by the DOE Office of Science, Fusion Energy Science under contract No. SF00515 and supported under FWP 100182 and DOE Office of Basic Energy Sciences, Materials Sciences and Engineering Division, contract DE-AC02-76SF00515.

  15. Correlations between soil respiration and soil properties in sugarcane areas under green and slash-and-burn management systems

    NASA Astrophysics Data System (ADS)

    Rodrigo Panosso, Alan; Milori, Débora M. B. P.; Marques Júnior, José; Martin-Neto, Ladislau; La Scala, Newton, Jr.

    2010-05-01

    Soil management causes changes in soil physical, chemical, and biological properties that consequently affect its CO2 emission. In this work we studied soil respiration (FCO2) in areas with sugarcane production in southern Brazil under two different sugarcane management systems: green (G), consisting of mechanized harvesting that produces a large amount of crop residues left on the soil surface, and slash-and-burn (SB), in which the residues are burned before manual harvest, leaving no residues on the soil surface. The study was conducted after the harvest period in two side-by-side grids installed in adjacent areas, having 20 measurement points each. The objective of this work was to determinate whether soil physical and chemical properties within each plot were useful in order to explain the spatial variability of FCO2, supposedly influence by each management system. Most of the soil physical properties studied showed no significant differences between management systems, but on the other hand most of the chemical properties differed significantly when SB and G areas were compared. Total FCO2 was 31% higher in the SB plot (729 g CO2 m-2) when compared to the G plot (557 g CO2 m-2) throughout the 70-day period after harvest studied. This seems to be related to the sensitivity of FCO2 to precipitation events, as respiration in this plot increased significantly with increases in soil moisture. Despite temporal variability showed to be positively related to soil moisture, inside each management system there was a negative correlation (p<0.01) between the spatial changes of FCO2 and soil moisture (MS), R= -0.56 and -0.59 for G and SB respectively. There was no spatial correlation between FCO2 and soil organic matter in each management system, however, the humification index (Hum) of organic matter was negatively linear correlated with FCO2 in SB (R= -0.53, p<0.05) while positively linear correlated in G area (R=0.42, p<0.10). The multiple regression model analysis applied in each management system indicates that 63% of the FCO2 spatial variability in G managed could be explained by the model: FCO2(G)= 4.11978 -0.07672MS + 0.0045Hum +1.5352K -0.04474FWP, where K and FWP are potassium content and free water porosity in G area, respectively. On the other hand, 75% of FCO2 spatial variability in SB managed plot was accounted by the model: FCO2(SB) = 10.66774 -0.08624MS -0.02904Hum -2.42548K. Therefore, soil moisture, humification index of organic matter and potassium level were the main properties able to explain the spatial variability of FCO2 in both sugarcane management systems. This result indicates that changes in sugarcane management systems could result in changes on the soil chemical properties, mostly, especially humification index of organic matter. It seems that in conversion from slash-and-burn to green harvest system, free water porosity turns to be an important aspect in order to explain part of FCO2 spatial variability in green managed system.

  16. Effects of Light Stress on Extracellular Cycling in a Cyanobacterial Biofilm Community

    NASA Astrophysics Data System (ADS)

    Stuart, R.; Mayali, X.; Pett-Ridge, J.; Weber, P. K.; Thelen, M.; Bebout, B.; Lipton, M. S.

    2015-12-01

    Cyanobacterial carbon excretion is crucial to carbon cycling in many microbial communities, but the nature and bioavailability of the carbon excreted is dependent on physiological function, which is often unknown. Cyanobacteria are the dominant primary producers in hypersaline mats and there is large reservoir of carbon in the extracellular matrix, but the nature and flux is understudied. In a previous study, we examined the macromolecular composition of the matrix of microbial mats from Elkhorn Slough in Monterey Bay, California and a unicyanobacterial culture, ESFC-1, isolated from the those mats, and found evidence for cyanobacterial degradation and re-uptake of extracellular organic matter. In this work, we further explore mechanisms of this degradation and re-uptake by examining effects of light using a combination of high-resolution imaging mass spectrometry (NanoSIMS) and metaproteomics of extracellular proteins. Based on these findings, we propose that mat Cyanobacteria store and recycle organic material from the mat extracellular matrix. Cyanobacteria can account for 70-90% of the biomass in the upper phototrophic layer of the mats, so their re-uptake of organic carbon and nitrogen has the potential to re-define organic matter availability in these systems. This work has implications for cyanobacterial adaptation to dynamic environments like microbial mats, where uptake of carbon and nitrogen in variable forms may be necessary to persist. This research was supported by the U.S. Department of Energy Office of Science, Office of Biological and Environmental Research Genomic Science program under FWP SCW1039. Work at LLNL was performed under the auspices of the U.S. Department of Energy under Contract DE-AC52-07NA27344.

  17. Fish Passage Assessment: Big Canyon Creek Watershed, Technical Report 2004.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Christian, Richard

    2004-02-01

    This report presents the results of the fish passage assessment as outlined as part of the Protect and Restore the Big Canyon Creek Watershed project as detailed in the CY2003 Statement of Work (SOW). As part of the Northwest Power Planning Council's Columbia Basin Fish and Wildlife Program (FWP), this project is one of Bonneville Power Administration's (BPA) many efforts at off-site mitigation for damage to salmon and steelhead runs, their migration, and wildlife habitat caused by the construction and operation of federal hydroelectric dams on the Columbia River and its tributaries. The proposed restoration activities within the Big Canyonmore » Creek watershed follow the watershed restoration approach mandated by the Fisheries and Watershed Program. Nez Perce Tribal Fisheries/Watershed Program vision focuses on protecting, restoring, and enhancing watersheds and treaty resources within the ceded territory of the Nez Perce Tribe under the Treaty of 1855 with the United States Federal Government. The program uses a holistic approach, which encompasses entire watersheds, ridge top to ridge top, emphasizing all cultural aspects. We strive toward maximizing historic ecosystem productive health, for the restoration of anadromous and resident fish populations. The Nez Perce Tribal Fisheries/Watershed Program (NPTFWP) sponsors the Protect and Restore the Big Canyon Creek Watershed project. The NPTFWP has the authority to allocate funds under the provisions set forth in their contract with BPA. In the state of Idaho vast numbers of relatively small obstructions, such as road culverts, block thousands of miles of habitat suitable for a variety of fish species. To date, most agencies and land managers have not had sufficient, quantifiable data to adequately address these barrier sites. The ultimate objective of this comprehensive inventory and assessment was to identify all barrier crossings within the watershed. The barriers were then prioritized according to the amount of habitat blocked at each site and the fish life history stages impacted. This assessment protocol will hopefully prove useful to other agencies and become a model for use in other watersheds.« less

  18. Fluorescence and absorption spectroscopy for warm dense matter studies and ICF plasma diagnostics

    NASA Astrophysics Data System (ADS)

    Hansen, Stephanie

    2017-10-01

    The burning core of an inertial confinement fusion (ICF) plasma at stagnation is surrounded by a shell of warm, dense matter whose properties are difficult both to model (due to a complex interplay of thermal, degeneracy, and strong coupling effects) and to diagnose (due to low emissivity and high opacity). We demonstrate a promising technique to study the warm dense shells of ICF plasmas based on the fluorescence emission of dopants or impurities in the shell material. This emission, which is driven by x-rays produced in the hot core, exhibits signature changes in response to compression and heating. High-resolution measurements of absorption and fluorescence features can refine our understanding of the electronic structure of material under high compression, improve our models of density-driven phenomena such as ionization potential depression and plasma polarization shifts, and help diagnose shell density, temperature, mass distribution, and residual motion in ICF plasmas at stagnation. Sandia National Laboratories is a multi-mission laboratory managed and operated by National Technology and Engineering Solutions of Sandia, LLC., a wholly owned subsidiary of Honeywell International, Inc., for the U.S. Department of Energy's National Nuclear Security Administration under contract DE-NA-0003525. This work was supported by the U.S. Department of Energy, Office of Science Early Career Research Program, Office of Fusion Energy Sciences under FWP-14-017426.

  19. Realistic calculations for c-coefficients of the isobaric mass multiplet equation in 1 p 0 f shell nuclei

    NASA Astrophysics Data System (ADS)

    Ormand, Erich; Brown, Alex; Hjorth-Jensen, Morten

    2017-09-01

    We present calculations for the c-coefficients of the isobaric mass multiplet equation for nuclei from A = 42 to A = 54 based on two-body effective interactions derived from three realistic nucleon-nucleon interactions: CD-Bonn, N3LO, and Argonne V18. The two-body effective interactions were derived using G-matrix or Vlowk augmented by perturbation theory extended to third order. We demonstrate a clear dependence in the c-coefficients on the short-ranged charge-symmetry breaking (CSB) part of the strong interaction, which is required to reproduce their overall behavior as a function of excitation (angular momentum). We find, however, that the CSB component in all three realistic nucleon-nucleon interactions is too large when compared to experiment, and that, furthermore, there is significant disagreement between each of the three interactions. This implies either: 1) a deficiency in our understanding of isospin-symmetry breaking in the nucleon-nucleon interaction, 2) significant isospin-symmetry breaking in the initial three-nucleon interaction, or 3) large contributions to isospin-symmetry breaking in three-nucleon interactions induced by the renormalization procedure. This work performed for the U.S. DOE by LLNL under Contract DE-AC52-07NA27344. WEO: DOE/NP FWP SCW0498. BAB: NSF Grant No. PHY-1404442. MHJ: NSF Grant No. PHY-1404159 and the Research Council of Norway contract ISP-Fysikk/216699.

  20. A pervasive parallel framework for visualization: final report for FWP 10-014707

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moreland, Kenneth D.

    2014-01-01

    We are on the threshold of a transformative change in the basic architecture of highperformance computing. The use of accelerator processors, characterized by large core counts, shared but asymmetrical memory, and heavy thread loading, is quickly becoming the norm in high performance computing. These accelerators represent significant challenges in updating our existing base of software. An intrinsic problem with this transition is a fundamental programming shift from message passing processes to much more fine thread scheduling with memory sharing. Another problem is the lack of stability in accelerator implementation; processor and compiler technology is currently changing rapidly. This report documentsmore » the results of our three-year ASCR project to address these challenges. Our project includes the development of the Dax toolkit, which contains the beginnings of new algorithms for a new generation of computers and the underlying infrastructure to rapidly prototype and build further algorithms as necessary.« less

  1. Solid-density plasma expansion in intense ultra-short laser irradiation measured on nanometer scale and in real time

    NASA Astrophysics Data System (ADS)

    Kluge, T.; Metzkes, J.; Pelka, A.; Laso Garcia, A.; Prencipe, I.; Bussmann, M.; Zeil, K.; Schoenherr, T.; Hartley, N.; Gutt, C.; Galtier, E.; Nam, I.; Lee, Hj; McBride, Ee; Glenzer, S.; Huebner, U.; Roedel, C.; Nakatsutsumi, M.; Roedel, M.; Rehwald, M.; Garten, M.; Zacharias, M.; Schramm, U.; Cowan, T. E.

    2017-10-01

    Small Angle X-ray Scattering (SAXS) is discussed to allow unprecedented direct measurements limited only by the probe X-ray wavelength and duration. Here we present the first direct in-situ measurement of intense short-pulse laser - solid interaction that allows nanometer and high temporal resolution at the same time. A 120 fs laser pulse with energy 1 J was focused on a silicon membrane. The density was probed with an X-ray beam of 49 fs duration by SAXS. Despite prepulses, we can exclude premature bulk expansion. The plasma expansion is triggered only shortly before the main pulse, when an expansion of 10 nm within less than 200 fs was measured. Analysis of scattering patterns allows the first direct verification of numerical simulations. Supported by DOE FWP 100182, SF00515; EC FP7 LASERLAB-EUROPE/CHARPAC (contract 284464); German Federal Ministry of Education and Research (BMBF) under Contract Number 03Z1O511; MG and MZ supported by the European Union's Horizon 2020 No 654220.

  2. Helium Ion Microscope: A New Tool for Sub-nanometer Imaging of Soft Materials

    NASA Astrophysics Data System (ADS)

    Shutthanandan, V.; Arey, B.; Smallwood, C. R.; Evans, J. E.

    2017-12-01

    High-resolution inspection of surface details is needed in many biological and environmental researches to understand the Soil organic material (SOM)-mineral interactions along with identifying microbial communities and their interactions. SOM shares many imaging characteristics with biological samples and getting true surface details from these materials are challenging since they consist of low atomic number materials. FE-SEM imaging is the main imagining technique used to image these materials in the past. These SEM images often show loss of resolution and increase noise due to beam damage and charging issues. Newly developed Helium Ion Microscope (HIM), on the other hand can overcome these difficulties and give very fine details. HIM is very similar to scanning electron microscopy (SEM) but instead of using electrons as a probe beam, HIM uses helium ions with energy ranges from 5 to 40 keV. HIM offers a series of advantages compared to SEM such as nanometer and sub-nanometer image resolutions (about 0.35 nm), detailed surface topography, high surface sensitivity, low Z material imaging (especially for polymers and biological samples), high image contrast, and large depth of field. In addition, HIM also has the ability to image insulating materials without any conductive coatings so that surface details are not modified. In this presentation, several scientific applications across biology and geochemistry will be presented to highlight the effectiveness of this powerful microscope. Acknowledgements: Research was performed using the Environmental Molecular Sciences Laboratory (EMSL), a national scientific user facility sponsored by the Department of Energy's Office of Biological and Environmental Research and located at PNNL. Work was supported by DOE-BER Mesoscale to Molecules Bioimaging Project FWP# 66382.

  3. Metamodeling and mapping of nitrate flux in the unsaturated zone and groundwater, Wisconsin, USA

    NASA Astrophysics Data System (ADS)

    Nolan, Bernard T.; Green, Christopher T.; Juckem, Paul F.; Liao, Lixia; Reddy, James E.

    2018-04-01

    Nitrate contamination of groundwater in agricultural areas poses a major challenge to the sustainability of water resources. Aquifer vulnerability models are useful tools that can help resource managers identify areas of concern, but quantifying nitrogen (N) inputs in such models is challenging, especially at large spatial scales. We sought to improve regional nitrate (NO3-) input functions by characterizing unsaturated zone NO3- transport to groundwater through use of surrogate, machine-learning metamodels of a process-based N flux model. The metamodels used boosted regression trees (BRTs) to relate mappable landscape variables to parameters and outputs of a previous "vertical flux method" (VFM) applied at sampled wells in the Fox, Wolf, and Peshtigo (FWP) river basins in northeastern Wisconsin. In this context, the metamodels upscaled the VFM results throughout the region, and the VFM parameters and outputs are the metamodel response variables. The study area encompassed the domain of a detailed numerical model that provided additional predictor variables, including groundwater recharge, to the metamodels. We used a statistical learning framework to test a range of model complexities to identify suitable hyperparameters of the six BRT metamodels corresponding to each response variable of interest: NO3- source concentration factor (which determines the local NO3- input concentration); unsaturated zone travel time; NO3- concentration at the water table in 1980, 2000, and 2020 (three separate metamodels); and NO3- "extinction depth", the eventual steady state depth of the NO3- front. The final metamodels were trained to 129 wells within the active numerical flow model area, and considered 58 mappable predictor variables compiled in a geographic information system (GIS). These metamodels had training and cross-validation testing R2 values of 0.52 - 0.86 and 0.22 - 0.38, respectively, and predictions were compiled as maps of the above response variables. Testing performance was reasonable, considering that we limited the metamodel predictor variables to mappable factors as opposed to using all available VFM input variables. Relationships between metamodel predictor variables and mapped outputs were generally consistent with expectations, e.g. with greater source concentrations and NO3- at the groundwater table in areas of intensive crop use and well drained soils. Shorter unsaturated zone travel times in poorly drained areas likely indicated preferential flow through clay soils, and a tendency for fine grained deposits to collocate with areas of shallower water table. Numerical estimates of groundwater recharge were important in the metamodels and may have been a proxy for N input and redox conditions in the northern FWP, which had shallow predicted NO3- extinction depth. The metamodel results provide proof-of-concept for regional characterization of unsaturated zone NO3- transport processes in a statistical framework based on readily mappable GIS input variables.

  4. Metamodeling and mapping of nitrate flux in the unsaturated zone and groundwater, Wisconsin, USA

    USGS Publications Warehouse

    Nolan, Bernard T.; Green, Christopher T.; Juckem, Paul F.; Liao, Lixia; Reddy, James E.

    2018-01-01

    Nitrate contamination of groundwater in agricultural areas poses a major challenge to the sustainability of water resources. Aquifer vulnerability models are useful tools that can help resource managers identify areas of concern, but quantifying nitrogen (N) inputs in such models is challenging, especially at large spatial scales. We sought to improve regional nitrate (NO3−) input functions by characterizing unsaturated zone NO3− transport to groundwater through use of surrogate, machine-learning metamodels of a process-based N flux model. The metamodels used boosted regression trees (BRTs) to relate mappable landscape variables to parameters and outputs of a previous “vertical flux method” (VFM) applied at sampled wells in the Fox, Wolf, and Peshtigo (FWP) river basins in northeastern Wisconsin. In this context, the metamodels upscaled the VFM results throughout the region, and the VFM parameters and outputs are the metamodel response variables. The study area encompassed the domain of a detailed numerical model that provided additional predictor variables, including groundwater recharge, to the metamodels. We used a statistical learning framework to test a range of model complexities to identify suitable hyperparameters of the six BRT metamodels corresponding to each response variable of interest: NO3− source concentration factor (which determines the local NO3− input concentration); unsaturated zone travel time; NO3− concentration at the water table in 1980, 2000, and 2020 (three separate metamodels); and NO3− “extinction depth”, the eventual steady state depth of the NO3−front. The final metamodels were trained to 129 wells within the active numerical flow model area, and considered 58 mappable predictor variables compiled in a geographic information system (GIS). These metamodels had training and cross-validation testing R2 values of 0.52 – 0.86 and 0.22 – 0.38, respectively, and predictions were compiled as maps of the above response variables. Testing performance was reasonable, considering that we limited the metamodel predictor variables to mappable factors as opposed to using all available VFM input variables. Relationships between metamodel predictor variables and mapped outputs were generally consistent with expectations, e.g. with greater source concentrations and NO3− at the groundwater table in areas of intensive crop use and well drained soils. Shorter unsaturated zone travel times in poorly drained areas likely indicated preferential flow through clay soils, and a tendency for fine grained deposits to collocate with areas of shallower water table. Numerical estimates of groundwater recharge were important in the metamodels and may have been a proxy for N input and redox conditions in the northern FWP, which had shallow predicted NO3− extinction depth. The metamodel results provide proof-of-concept for regional characterization of unsaturated zone NO3− transport processes in a statistical framework based on readily mappable GIS input variables.

  5. 40 CFR 35.107 - Work plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Work plans. 35.107 Section 35.107... ASSISTANCE Environmental Program Grants Preparing An Application § 35.107 Work plans. (a) Bases for negotiating work plans. The work plan is negotiated between the applicant and the Regional Administrator and...

  6. 77 FR 29317 - Fiscal Year 2011 Draft Work Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-17

    ... DENALI COMMISSION Fiscal Year 2011 Draft Work Plan AGENCY: Denali Commission. ACTION: Notice... develop proposed work plans for future spending and that the annual Work Plan be published in the Federal... Work Plan for Federal Fiscal Year 2011. DATES: Comments and related material to be received by June 10...

  7. 40 CFR 35.507 - Work plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Work plans. 35.507 Section 35.507... ASSISTANCE Environmental Program Grants for Tribes Preparing An Application § 35.507 Work plans. (a) Bases for negotiating work plans. The work plan is negotiated between the applicant and the Regional...

  8. 40 CFR 35.507 - Work plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Work plans. 35.507 Section 35.507... ASSISTANCE Environmental Program Grants for Tribes Preparing An Application § 35.507 Work plans. (a) Bases for negotiating work plans. The work plan is negotiated between the applicant and the Regional...

  9. 40 CFR 35.107 - Work plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Work plans. 35.107 Section 35.107... ASSISTANCE Environmental Program Grants Preparing An Application § 35.107 Work plans. (a) Bases for negotiating work plans. The work plan is negotiated between the applicant and the Regional Administrator and...

  10. 7 CFR 23.13 - Plan of Work.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 1 2011-01-01 2011-01-01 false Plan of Work. 23.13 Section 23.13 Agriculture Office of the Secretary of Agriculture STATE AND REGIONAL ANNUAL PLANS OF WORK Regional Program § 23.13 Plan of Work. (a) A Regional Plan of Work for carrying out the programs authorized to be funded under...

  11. Warm Dense Matter Demonstrating Non-Drude Conductivity from Observations of Nonlinear Plasmon Damping

    NASA Astrophysics Data System (ADS)

    Witte, Bastian B. L.

    2017-10-01

    The thermal and electrical conductivity, equation of state and the spectral opacity in warm dense matter (WDM) are essential properties for modeling, e.g., fusion experiments or the magnetic field generation in planets. In the last decade it has been shown that x-ray Thomson scattering (XRTS) is an effective tool to determine plasma parameters like temperature and density in the WDM regime. Recently, the electrical conductivity was extracted from XRTS experiments for the first time. The spectrally resolved scattering data of aluminum, isochorically heated by the Linac Coherent Light Source (LCLS), show strong dependence on electron correlations. Therefore, the damping of plasmons, the collective electron oscillations, has to be treated beyond perturbation theory. We present results for the dynamic transport properties in warm dense aluminum using density-functional-theory molecular dynamics (DFT-MD) simulations. The choice of the exchange-correlation (XC) functional, describing the interactions in the electronic subsystem, has significant impact on the ionization energy of bound electrons and the dynamic dielectric function. Our newly developed method for the calculation of XRTS signals including plasmon and bound-free transitions is based on transition matrix elements together with ionic contributions using uniquely DFT-MD simulations. The results show excellent agreement with the LCLS data if hybrid functionals are applied. The experimental finding of nonlinear plasmon damping is caused by the non-Drude conductivity in warm dense aluminum. Here, we show further validation by comparing with x-ray absorption data. These findings enable new insights into the impact of XC functionals on calculated properties of WDM and allow detailed predictions for future experiments at the unprecedented densities on the NIF. This work was performed in collaboration with P. Sperling, S.H. Glenzer, R. Redmer and was supported by the DFG via the Collaborative Research Center SFB 652 and the DOE Office of Science, Fusion Energy Science under Grant No. FWP 100182.

  12. 7 CFR 23.6 - Plan of Work.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 1 2011-01-01 2011-01-01 false Plan of Work. 23.6 Section 23.6 Agriculture Office of the Secretary of Agriculture STATE AND REGIONAL ANNUAL PLANS OF WORK State Program § 23.6 Plan of Work. (a) A State Annual Plan of Work for carrying out the programs authorized under title V shall be...

  13. 7 CFR 23.6 - Plan of Work.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Plan of Work. 23.6 Section 23.6 Agriculture Office of the Secretary of Agriculture STATE AND REGIONAL ANNUAL PLANS OF WORK State Program § 23.6 Plan of Work. (a) A State Annual Plan of Work for carrying out the programs authorized under title V shall be...

  14. FWP executive summaries, Basic Energy Sciences Materials Sciences Programs (SNL/NM)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Samara, G.A.

    1997-05-01

    The BES Materials Sciences Program has the central theme of Scientifically Tailored Materials. The major objective of this program is to combine Sandia`s expertise and capabilities in the areas of solid state sciences, advanced atomic-level diagnostics and materials synthesis and processing science to produce new classes of tailored materials as well as to enhance the properties of existing materials for US energy applications and for critical defense needs. Current core research in this program includes the physics and chemistry of ceramics synthesis and processing, the use of energetic particles for the synthesis and study of materials, tailored surfaces and interfacesmore » for materials applications, chemical vapor deposition sciences, artificially-structured semiconductor materials science, advanced growth techniques for improved semiconductor structures, transport in unconventional solids, atomic-level science of interfacial adhesion, high-temperature superconductors, and the synthesis and processing of nano-size clusters for energy applications. In addition, the program includes the following three smaller efforts initiated in the past two years: (1) Wetting and Flow of Liquid Metals and Amorphous Ceramics at Solid Interfaces, (2) Field-Structured Anisotropic Composites, and (3) Composition-Modulated Semiconductor Structures for Photovoltaic and Optical Technologies. The latter is a joint effort with the National Renewable Energy Laboratory. Separate summaries are given of individual research areas.« less

  15. Ultrafast-electron-diffraction studies of predamaged tungsten excited by femtosecond optical pulses

    NASA Astrophysics Data System (ADS)

    Mo, M.; Chen, Z.; Li, R.; Wang, Y.; Shen, X.; Dunning, M.; Weathersby, S.; Makasyuk, I.; Coffee, R.; Zhen, Q.; Kim, J.; Reid, A.; Jobe, K.; Hast, C.; Tsui, Y.; Wang, X.; Glenzer, S.

    2016-10-01

    Tungsten is considered as the main candidate material for use in the divertor of magnetic confinement fusion reactors. However, radiation damage is expected to occur because of its direct exposure to the high flux of hot plasma and energetic neutrons in fusion environment. Hence, understanding the material behaviors of W under these adverse conditions is central to the design of magnetic fusion reactors. To do that, we have recently developed an MeV ultrafast electron diffraction probe to resolve the structural evolution of optically excited tungsten. To simulate the radiation damage effect, the tungsten samples were bombarded with 500 keV Cu ions. The pre-damaged and pristine W's were excited by 130fs, 400nm laser pulses, and the subsequent heated system was probed with 3.2MeV electrons. The pump probe measurement shows that the ion bombardment to the W leads to larger decay in Bragg peak intensities as compared to pristine W, which may be due to a phonon softening effect. The measurement also shows that pre-damaged W transitions into complete liquid phase for conditions where pristine W stays solid. Our new capability is able to test the theories of structural dynamics of W under conditions relevant to fusion reactor environment. The research was funded by DOE Fusion Energy Science under FWP #100182.

  16. 7 CFR 1924.5 - Planning development work.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 12 2011-01-01 2011-01-01 false Planning development work. 1924.5 Section 1924.5... Planning development work. (a) Extent of development. For an FO loan, the plans for development will... for development work. The total cash cost of all planned development will be shown on Form FmHA or its...

  17. 7 CFR 1717.604 - Long-range engineering plans and construction work plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...

  18. 7 CFR 1717.604 - Long-range engineering plans and construction work plans.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 11 2013-01-01 2013-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...

  19. 7 CFR 1717.604 - Long-range engineering plans and construction work plans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 11 2014-01-01 2014-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...

  20. 7 CFR 1717.604 - Long-range engineering plans and construction work plans.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 11 2012-01-01 2012-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...

  1. 7 CFR 1717.604 - Long-range engineering plans and construction work plans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 11 2011-01-01 2011-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...

  2. Psychotherapeutic and work-oriented interventions: employment outcomes among young adults with work disability due to a mental disorder.

    PubMed

    Mattila-Holappa, Pauliina; Joensuu, Matti; Ahola, Kirsi; Koskinen, Aki; Tuisku, Katinka; Ervasti, Jenni; Virtanen, Marianna

    2016-01-01

    We examined the extent to which psychotherapeutic and work-oriented interventions were included in a medical treatment and rehabilitation plan and whether they predicted future employment among young adults with work disability due to a mental disorder. Data were obtained from the treatment and rehabilitation plans of 1163 young adults aged 18‒34 years, who in 2008 were granted fixed-term work disability compensation due to a mental disorder and were followed for 5 years. Forty-six percent had no proposal for psychotherapy or a work-oriented intervention in their treatment and rehabilitation plan, 22 % had a plan for only a psychotherapeutic intervention, 23 % had a plan for only a work-oriented intervention, and 10 % had both types of interventions planned. Having a planned psychotherapeutic intervention (HR = 1.35, 95 % CI 1.07-1.69) and of the work-oriented interventions, planned rehabilitative courses and training (HR = 1.34, 95 % CI 1.03-1.70) predicted quicker entry into competitive employment. Having a plan for both a psychotherapeutic and work-oriented intervention was associated with being employed at the end of the follow-up (OR = 1.77, 95 % CI 1.07-2.95). Young adults with a long-term psychiatric work disability episode rarely have a recorded plan for rehabilitation in their treatment and rehabilitation plan although psychotherapeutic interventions and a combination of a psychotherapeutic and work-oriented intervention might help them gain employment.

  3. 7 CFR 23.13 - Plan of Work.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... multi-State organizations or bodies for those activities of the Regional Rural Development Centers which... of the Secretary of Agriculture STATE AND REGIONAL ANNUAL PLANS OF WORK Regional Program § 23.13 Plan of Work. (a) A Regional Plan of Work for carrying out the programs authorized to be funded under...

  4. 77 FR 47373 - Fiscal Year 2012 Draft Work Plan; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-08

    ... DENALI COMMISSION Fiscal Year 2012 Draft Work Plan; Correction AGENCY: Denali Commission. ACTION... Federal Register of May 23, 2012, concerning request for comments on the Draft Work Plan for Federal Fiscal Year 2012. This revision to Fiscal Year 2012 Work Plan is to provide clarifying edits. In...

  5. 7 CFR 1710.209 - Approval requirements for load forecast work plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... cooperate in the preparation of and submittal of the load forecast work plan of their power supply borrower. (b) An approved load forecast work plan establishes the process for the preparation and maintenance... approved load forecast work plan must outline the coordination and preparation requirements for both the...

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan formore » the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.« less

  7. PlanWorks: A Debugging Environment for Constraint Based Planning Systems

    NASA Technical Reports Server (NTRS)

    Daley, Patrick; Frank, Jeremy; Iatauro, Michael; McGann, Conor; Taylor, Will

    2005-01-01

    Numerous planning and scheduling systems employ underlying constraint reasoning systems. Debugging such systems involves the search for errors in model rules, constraint reasoning algorithms, search heuristics, and the problem instance (initial state and goals). In order to effectively find such problems, users must see why each state or action is in a plan by tracking causal chains back to part of the initial problem instance. They must be able to visualize complex relationships among many different entities and distinguish between those entities easily. For example, a variable can be in the scope of several constraints, as well as part of a state or activity in a plan; the activity can arise as a consequence of another activity and a model rule. Finally, they must be able to track each logical inference made during planning. We have developed PlanWorks, a comprehensive system for debugging constraint-based planning and scheduling systems. PlanWorks assumes a strong transaction model of the entire planning process, including adding and removing parts of the constraint network, variable assignment, and constraint propagation. A planner logs all transactions to a relational database that is tailored to support queries for of specialized views to display different forms of data (e.g. constraints, activities, resources, and causal links). PlanWorks was specifically developed for the Extensible Universal Remote Operations Planning Architecture (EUROPA(sub 2)) developed at NASA, but the underlying principles behind PlanWorks make it useful for many constraint-based planning systems. The paper is organized as follows. We first describe some fundamentals of EUROPA(sub 2). We then describe PlanWorks' principal components. We then discuss each component in detail, and then describe inter-component navigation features. We close with a discussion of how PlanWorks is used to find model flaws.

  8. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1989.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration. Division of Fish and Wildlife.

    1988-11-01

    The FY 1989 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1989. The Work Plan focuses on individual Action Items found in the 1987 Program for which Bonneville Power Administration (BPA) has determined that it has authority and responsibility to implement. Each of the entries in the Work Plan includes objectives, background, and progress to date in achieving those objectives, and a summary of plans for implementation in FY 1989. Most Action Items are implemented through one or moremore » BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. The FY 1989 Work Plan emphasizes continuation of 113 projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. BPA also plans to start 20 new projects in FY 1989. The number of ongoing FY 1988 projects to be continued in FY 1989 and the number of new projects planned to start in FY 1989 are based on current (September 7, 1988) procurement expectations. Several projects presently in BPA's procurement process are expected to be contracted by September 30, 1988, the last day of FY 1988. Although these projects have not yet started, they have been listed in the Work Plan as ongoing FY 1988 projects, based on projected start dates in late September 1988. Throughout the Work Plan, those projects with projected start dates in September 1988 have been noted.« less

  9. AI-MSG modification work plan. [LMFBR

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Page, J.P.

    1973-08-20

    This document contains the Work Plan for the modification of the AI Steam Generator for tests in Large Leak Test Rig. This Work Plan describes the objectives, scope of work, schedule and manpower, end items, and meetings and reports required for the modification.

  10. Migration plans and hours of work in Malaysia.

    PubMed

    Gillin, E D; Sumner, D A

    1985-01-01

    "This article describes characteristics of prospective migrants in the Malaysian Family Life Survey and investigates how planning to move affects hours of work. [The authors] use ideas about intertemporal substitution...to discuss the response to temporary and permanent wage expectations on the part of potential migrants. [An] econometric section presents reduced-form estimates for wage rates and planned migration equations and two-stage least squares estimates for hours of work. Men currently planning a move were found to work fewer hours. Those originally planning only a temporary stay at their current location work more hours." excerpt

  11. Parents as Role Models: Parental Behavior Affects Adolescents' Plans for Work Involvement

    ERIC Educational Resources Information Center

    Wiese, Bettina S.; Freund, Alexandra M.

    2011-01-01

    This study (N = 520 high-school students) investigates the influence of parental work involvement on adolescents' own plans regarding their future work involvement. As expected, adolescents' perceptions of parental work behavior affected their plans for own work involvement. Same-sex parents served as main role models for the adolescents' own…

  12. Training Planning and Working Memory in Third Graders

    ERIC Educational Resources Information Center

    Goldin, Andrea Paula; Segretin, Maria Soledad; Hermida, Maria Julia; Paz, Luciano; Lipina, Sebastian Javier; Sigman, Mariano

    2013-01-01

    Working memory and planning are fundamental cognitive skills supporting fluid reasoning. We show that 2 games that train working memory and planning skills in school-aged children promote transfer to 2 different tasks: an attentional test and a fluid reasoning test. We also show long-term improvement of planning and memory capacities in…

  13. Translations on People’s Republic of China, Number 379

    DTIC Science & Technology

    1977-05-03

    TECHNOLOGICAL Family Planning, Birth Control Linked to Learning- From-Ta-chai (Various sources, various dates) 18 Family Planning Work Well Done in...Nan-kung-hsien Female Labor Force Liberated Through Birth Control Two Counties Hailed for Good Family Planning Work Careful Records Kept on Women...CSO: 4006 17 SCIENTIFIC AND TECHNOLOGICAL FAMILY PLANNING, BIRTH CONTROL LINKED TO LEARNING-FROM-TA-CHAI Family Planning Work Well Done in Nan-kung

  14. 48 CFR 307.7108 - Statement of work.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Statement of work. 307... ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Plan 307.7108 Statement of work. (a) General. An SOW describes the work or services a contractor is to perform in reaching an end result without describing the...

  15. 7 CFR 1710.255 - Energy efficiency work plans-energy efficiency borrowers.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 11 2014-01-01 2014-01-01 false Energy efficiency work plans-energy efficiency... TO ELECTRIC LOANS AND GUARANTEES Construction Work Plans and Related Studies § 1710.255 Energy efficiency work plans—energy efficiency borrowers. (a) All energy efficiency borrowers must maintain a...

  16. The costs of changing an intended action: movement planning, but not execution, interferes with verbal working memory.

    PubMed

    Spiegel, M A; Koester, D; Weigelt, M; Schack, T

    2012-02-16

    How much cognitive effort does it take to change a movement plan? In previous studies, it has been shown that humans plan and represent actions in advance, but it remains unclear whether or not action planning and verbal working memory share cognitive resources. Using a novel experimental paradigm, we combined in two experiments a grasp-to-place task with a verbal working memory task. Participants planned a placing movement toward one of two target positions and subsequently encoded and maintained visually presented letters. Both experiments revealed that re-planning the intended action reduced letter recall performance; execution time, however, was not influenced by action modifications. The results of Experiment 2 suggest that the action's interference with verbal working memory arose during the planning rather than the execution phase of the movement. Together, our results strongly suggest that movement planning and verbal working memory share common cognitive resources. Copyright © 2011 Elsevier Ireland Ltd. All rights reserved.

  17. Interference due to shared features between action plans is influenced by working memory span.

    PubMed

    Fournier, Lisa R; Behmer, Lawrence P; Stubblefield, Alexandra M

    2014-12-01

    In this study, we examined the interactions between the action plans that we hold in memory and the actions that we carry out, asking whether the interference due to shared features between action plans is due to selection demands imposed on working memory. Individuals with low and high working memory spans learned arbitrary motor actions in response to two different visual events (A and B), presented in a serial order. They planned a response to the first event (A) and while maintaining this action plan in memory they then executed a speeded response to the second event (B). Afterward, they executed the action plan for the first event (A) maintained in memory. Speeded responses to the second event (B) were delayed when it shared an action feature (feature overlap) with the first event (A), relative to when it did not (no feature overlap). The size of the feature-overlap delay was greater for low-span than for high-span participants. This indicates that interference due to overlapping action plans is greater when fewer working memory resources are available, suggesting that this interference is due to selection demands imposed on working memory. Thus, working memory plays an important role in managing current and upcoming action plans, at least for newly learned tasks. Also, managing multiple action plans is compromised in individuals who have low versus high working memory spans.

  18. 48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and..., safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... safety and health standards applicable to the work conditions of contractor and subcontractor employees...

  19. 48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and..., safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... safety and health standards applicable to the work conditions of contractor and subcontractor employees...

  20. 48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and..., safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... safety and health standards applicable to the work conditions of contractor and subcontractor employees...

  1. 48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and..., safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... safety and health standards applicable to the work conditions of contractor and subcontractor employees...

  2. 20 CFR 411.450 - What is an Individual Work Plan?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 2 2011-04-01 2011-04-01 false What is an Individual Work Plan? 411.450 Section 411.450 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE TICKET TO WORK AND SELF-SUFFICIENCY... work plan (IWP) is a required written document signed by an employment network (EN) (other than a State...

  3. 20 CFR 411.450 - What is an Individual Work Plan?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false What is an Individual Work Plan? 411.450 Section 411.450 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE TICKET TO WORK AND SELF-SUFFICIENCY... work plan (IWP) is a required written document signed by an employment network (EN) (other than a State...

  4. Request for Correction 15003 - Information Quality Act request for Correction of the TSCA Work Plan

    EPA Pesticide Factsheets

    This RFC concerns the Information Quality Act request for correction of the TSCA Work Plan for Chemical Assessments: 20154 Update and the TSCA Work Plan Chemicals: Methods Document (February 2012) regarding assessment of phthalic anhydride

  5. Social Work Education Planning & Assessment System: Handbook of Fundamental Assessment Concepts; Manual for Project Managers; Appendices.

    ERIC Educational Resources Information Center

    Social and Rehabilitation Service (DHEW), Washington, DC.

    The Social Work Education Planning and Assessment (SWEPA) System is an information system designed to function within social work education toward two main purposes: (1) to help schools more effectively specify their own educational objectives, plan their social work education projects to achieve these objectives, mark their progress toward this…

  6. 23 CFR 420.111 - What are the documentation requirements for use of FHWA planning and research funds?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... and subrecipients in a work program, or other document that describes the work to be accomplished... various combinations, or brought together as a single work program. The expenditure of PL funds for transportation planning outside of metropolitan planning areas under § 420.109(d) may be included in the work...

  7. UPWP Unified Planning Work Program

    DOT National Transportation Integrated Search

    1995-05-01

    The Unified Plannrng Work Program (UPWP) iS the planning document that guides the MPO staff in fulfilling its planning responstbilities for the upcoming year. Comprised of tasks that can be changed as the planning needs change. It is intended to serv...

  8. The Technical Work Plan Tracking Tool

    NASA Technical Reports Server (NTRS)

    Chullen, Cinda; Leighton, Adele; Weller, Richard A.; Woodfill, Jared; Parkman, William E.; Ellis, Glenn L.; Wilson, Marilyn M.

    2003-01-01

    The Technical Work Plan Tracking Tool is a web-based application that enables interactive communication and approval of contract requirements that pertain to the administration of the Science, Engineering, Analysis, and Test (SEAT) contract at Johnson Space Center. The implementation of the application has (1) shortened the Technical Work Plan approval process, (2) facilitated writing and documenting requirements in a performance-based environment with associated surveillance plans, (3) simplified the contractor s estimate of the cost for the required work, and (4) allowed for the contractor to document how they plan to accomplish the work. The application is accessible to over 300 designated NASA and contractor employees via two Web sites. For each employee, the application regulates access according to the employee s authority to enter, view, and/or print out diverse information, including reports, work plans, purchase orders, and financial data. Advanced features of this application include on-line approval capability, automatic e-mail notifications requesting review by subsequent approvers, and security inside and outside the firewall.

  9. Creating Your Life's Work Portfolio. An Interactive Career and Life Planning Workbook.

    ERIC Educational Resources Information Center

    1998

    Designed for those beginning a working life or with years of experience, this book leads the user through collecting records that document work history and affirm successes. It provides a step-by-step process to help plan one's life's work, make career decisions, and develop plans for new career directions and a structure to learn career planning…

  10. Social Work Education. Report of Master Plan Committee S.

    ERIC Educational Resources Information Center

    Illinois State Board of Higher Education, Springfield. Master Plan Committee.

    This report of the Master Plan Committee on Social Work Education is part of Phase III of the Illinois Statewide Master Plan for Higher Education dealing with graduate and professional education. Part I presents an overview. Part II gives a brief description of social work and a statement of the problem. In Part III the social work manpower in the…

  11. 40 CFR 35.418 - Award limitations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... STATE AND LOCAL ASSISTANCE Environmental Program Grants Water Quality Management Planning Grants... State agency: (a) Unless the agency develops its work plan jointly with local, regional and interstate... planning organizations to carry out portions of that work plan. (b) Unless the agency reports annually on...

  12. 40 CFR 35.418 - Award limitations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... STATE AND LOCAL ASSISTANCE Environmental Program Grants Water Quality Management Planning Grants... State agency: (a) Unless the agency develops its work plan jointly with local, regional and interstate... planning organizations to carry out portions of that work plan. (b) Unless the agency reports annually on...

  13. 40 CFR 35.418 - Award limitations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... STATE AND LOCAL ASSISTANCE Environmental Program Grants Water Quality Management Planning Grants... State agency: (a) Unless the agency develops its work plan jointly with local, regional and interstate... planning organizations to carry out portions of that work plan. (b) Unless the agency reports annually on...

  14. 40 CFR 63.306 - Work practice standards.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Standards for Coke Oven Batteries § 63.306 Work practice standards. (a) Work practice plan. On or before... plan for each coke oven battery. The plan shall be designed to achieve compliance with visible emission limitations for coke oven doors, topside port lids, offtake systems, and charging operations under this...

  15. 40 CFR 63.306 - Work practice standards.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... for Coke Oven Batteries § 63.306 Work practice standards. (a) Work practice plan. On or before... plan for each coke oven battery. The plan shall be designed to achieve compliance with visible emission limitations for coke oven doors, topside port lids, offtake systems, and charging operations under this...

  16. 40 CFR 63.306 - Work practice standards.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Standards for Coke Oven Batteries § 63.306 Work practice standards. (a) Work practice plan. On or before... plan for each coke oven battery. The plan shall be designed to achieve compliance with visible emission limitations for coke oven doors, topside port lids, offtake systems, and charging operations under this...

  17. 40 CFR 63.306 - Work practice standards.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Standards for Coke Oven Batteries § 63.306 Work practice standards. (a) Work practice plan. On or before... plan for each coke oven battery. The plan shall be designed to achieve compliance with visible emission limitations for coke oven doors, topside port lids, offtake systems, and charging operations under this...

  18. 77 FR 44216 - Mid-Atlantic Fishery Management Council (MAFMC); Public Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-27

    ..., 2012--The Visioning and Strategic Planning Working Group (facilitated by Adam R. Saslow, Senior.... SUMMARY: The Mid-Atlantic Fishery Management Council (Council) and its Strategic Planning Working Group... INFORMATION: Monday, August 13, 2012 9 a.m. until 5 p.m.--The Visioning and Strategic Planning Working Group...

  19. Work plan for the radiological survey for the David Witherspoon, Incorporated, Landfill-1630 site, Knoxville, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-07-01

    This work plan establishes the methods and requirements for performing a radiological survey at the David Witherspoon, Incorporated, Landfill-1630 Site, Knoxville, Tennessee (DWI 1630 Site) in accordance with requirements under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The radiological survey will identify the radiological contamination level of the equipment and debris stored at the DWI 1630 Site. The data generated from the survey activities will support the decisions for characterization of the equipment/debris and aid in subsequent disposition and waste handling. The survey activities to be performed under this work plan include an equipment radiological survey,more » a walkover survey, and an immunoassay testing for polychlorinated biphenyls (PCBs). This work plan includes a quality assurance (QA)/quality control (QC) project plan, a health and safety (H&S) plan, and a waste management plan.« less

  20. [Some psychological problems in family planning work].

    PubMed

    Chen, J

    1983-11-29

    Psychology has significance in family planning work, because it may promote the scientific nature of family planning work and thus increase its effectiveness. Since people have some common aspects in their psychological process, family planning workers should master some common rules of the people's psychological process in order to understand psychological trends and possible behavior. Through this method, family planning workers may find how to adjust to problems they may encounter in their daily work, such as the worries about a single child being too lonely, spoiled, and hard to handle for the parents, the traditional belief that more children represent good fortune, and more male children may provide security for one's old age. Traditionally, the Chinese people believed that only male children can carry on the family line and that more children will provide a larger labor force, which is beneficial to a family's financial situation. In family planning work, all such incorrect ways of thinking should be corrected and revised. Studies of children's psychology should also be developed so that children may develop a healthy mentality. All these are crucial to the success of family planning work and the promotion of population quality.

  1. A comparison of Canadian pediatric resident career plans in 1998 and 2006.

    PubMed

    Shamseer, Larissa; Roth, Daniel E; Tallett, Susan; Hilliard, Robert; Vohra, Sunita

    2008-12-01

    Studies of pediatric resident career plans and preferences help to forecast changes in the demographic profile and practice patterns of North American pediatricians, providing insights that can guide child health care and medical education policy making. With this study we aimed to compare 4 aspects of Canadian pediatric resident career plans in 1998 and 2006: (1) weekly work hours; (2) scope of practice; (3) professional activities; and (4) community size. Canadian pediatric residents were invited to participate in a national cross-sectional survey to explore career plans and preferences in 1998 (mailing) and 2006 (on-line). Response rates were 69% in 1998 and 52% in 2006. In both survey years, the majority of respondents were female (69% and 73%, respectively). Overall, residents planned to work a similar number of weekly hours in both survey years (47.8 vs 48.8). Women planned to work significantly fewer hours than men; this gap was wider in 2006 than in 1998 (1998: 2.8 fewer hours; 2006: 7.8 fewer hours). After adjusted analysis, the association between proportion of time in primary care and study year became significant; however, time in consultant general or subspecialty pediatrics remained nonsignificantly changed. Residents planned to spend less time in clinical work in 2006 than 1998 (64.4% vs 58.1%), and more planned to work and reside in metropolitan areas (68% vs 78% of decided respondents). Between 1998 and 2006, there was no overall change in the number of hours that Canadian pediatric residents planned to work, but the gender gap widened because of an increase in planned weekly work hours among men. The results also suggest that new strategies may be needed to improve future pediatrician availability in small communities by addressing barriers to nonmetropolitan practice, especially for women.

  2. Evaluation Planning, Evaluation Management, and Utilization of Evaluation Results within Adult Literacy Campaigns, Programs and Projects (with Implications for Adult Basic Education and Nonformal Education Programs in General). A Working Paper.

    ERIC Educational Resources Information Center

    Bhola, H. S.

    Addressed to professionals involved in program evaluation, this working paper covers various aspects of evaluation planning, including the following: planning as a sociotechnical process, steps in evaluation planning, program planning and implementation versus evaluation planning and implementation, the literacy system and its subsystems, and some…

  3. Bottom Up Succession Planning Works Better.

    ERIC Educational Resources Information Center

    Stevens, Paul

    The majority of current succession planning practices reflect the viewpoint of only a linear career direction for ambitious people. They are based on the premise that competent people have and want only one career direction--an upwardly mobile one. In today's work force, however, a "bottom-up" process works better in succession planning. This…

  4. Work-Plan Heroes: Student Strategies in Lower-Secondary Norwegian Classrooms

    ERIC Educational Resources Information Center

    Dalland, Cecilie P.; Klette, Kirsti

    2014-01-01

    This article explores how individualized teaching methods, such as the use of work plans, create new student strategies in Norwegian lower secondary classrooms. Work plans, which are frequently set up as instructional tools in Norwegian classrooms, outline different types of tasks and requirements that the students are supposed to do during a…

  5. When daily planning improves employee performance: The importance of planning type, engagement, and interruptions.

    PubMed

    Parke, Michael R; Weinhardt, Justin M; Brodsky, Andrew; Tangirala, Subrahmaniam; DeVoe, Sanford E

    2018-03-01

    Does planning for a particular workday help employees perform better than on other days they fail to plan? We investigate this question by identifying 2 distinct types of daily work planning to explain why and when planning improves employees' daily performance. The first type is time management planning (TMP)-creating task lists, prioritizing tasks, and determining how and when to perform them. We propose that TMP enhances employees' performance by increasing their work engagement, but that these positive effects are weakened when employees face many interruptions in their day. The second type is contingent planning (CP) in which employees anticipate possible interruptions in their work and plan for them. We propose that CP helps employees stay engaged and perform well despite frequent interruptions. We investigate these hypotheses using a 2-week experience-sampling study. Our findings indicate that TMP's positive effects are conditioned upon the amount of interruptions, but CP has positive effects that are not influenced by the level of interruptions. Through this study, we help inform workers of the different planning methods they can use to increase their daily motivation and performance in dynamic work environments. (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  6. Work and pregnancy: individual and organizational factors influencing organizational commitment, timing of maternity leave, and return to work.

    PubMed

    Lyness, K S; Thompson, C A; Francesco, A M; Judiesch, M K

    1999-10-01

    This study surveys pregnant women to examine the individual and organizational factors related with organizational commitment, planned timing of maternity leaves and return to work after childbirth. The survey was conducted on 86 pregnant women; among them, 73% were White, 8% were Asian, 7% were African-American, 6% were Hispanic, and 1% were Native-American respondents. The findings revealed that women whose organizations offered guaranteed jobs after childbirth planned to work later into their pregnancies and to return to work sooner after childbirth. Also, women who perceived supportive work-family cultures were more committed to their organizations and planned to return more quickly after childbirth than women who perceived less supportive cultures. Furthermore, women with less traditional attitudes towards parenting planned to work later into their pregnancies and return to work sooner after childbirth.

  7. 48 CFR 970.5223-1 - Integration of environment, safety, and health into work planning and execution.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Integration of environment, safety, and health into work planning and execution. As prescribed in 970.2303-3(b), insert the following clause: Integration of Environment, Safety, and Health Into Work Planning and... danger to the environment or health and safety of employees or the public, the Contracting Officer may...

  8. 48 CFR 970.5223-1 - Integration of environment, safety, and health into work planning and execution.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Integration of environment, safety, and health into work planning and execution. As prescribed in 970.2303-3(b), insert the following clause: Integration of Environment, Safety, and Health Into Work Planning and... danger to the environment or health and safety of employees or the public, the Contracting Officer may...

  9. 48 CFR 970.5223-1 - Integration of environment, safety, and health into work planning and execution.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Integration of environment, safety, and health into work planning and execution. As prescribed in 970.2303-3(b), insert the following clause: Integration of Environment, Safety, and Health Into Work Planning and... danger to the environment or health and safety of employees or the public, the Contracting Officer may...

  10. 48 CFR 970.5223-1 - Integration of environment, safety, and health into work planning and execution.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Integration of environment, safety, and health into work planning and execution. As prescribed in 970.2303-3(b), insert the following clause: Integration of Environment, Safety, and Health Into Work Planning and... danger to the environment or health and safety of employees or the public, the Contracting Officer may...

  11. 48 CFR 970.5223-1 - Integration of environment, safety, and health into work planning and execution.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Integration of environment... Integration of environment, safety, and health into work planning and execution. As prescribed in 970.2303-3(b), insert the following clause: Integration of Environment, Safety, and Health Into Work Planning and...

  12. 48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Integration of environment, safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and...

  13. Site planning and integration fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SCHULTZ, E.A.

    The primary mission of the Site Planning and Integration (SP and I) project is to assist Fluor Daniel Project Direction to ensure that all work performed under the Project Hanford Management Contract (PHMC) is adequately planned, executed, controlled, and that performance is measured and reported in an integrated fashion. Furthermore, SP and I is responsible for the development, implementation, and management of systems and processes that integrate technical, schedule, and cost baselines for PHMC work.

  14. Unified planning work program federal fiscal year 2008

    DOT National Transportation Integrated Search

    2008-01-01

    This Unified Planning Work Program (UPWP) contains information about surface-transportation planning projects that will be conducted in the Boston metropolitan region during the period of October 1, 2007, through September 30, 2008 (federal fiscal ye...

  15. The International Space Life Sciences Strategic Planning Working Group

    NASA Technical Reports Server (NTRS)

    White, Ronald J.; Rabin, Robert; Lujan, Barbara F.

    1993-01-01

    Throughout the 1980s, ESA and the space agencies of Canada, Germany, France, Japan, and the U.S. have pursued cooperative projects bilaterally and multilaterally to prepare for, and to respond to, opportunities in space life sciences research previously unapproachable in scale and sophistication. To cope effectively with likely future space research opportunities, broad, multilateral, coordinated strategic planning is required. Thus, life scientists from these agencies have allied to form the International Space Life Sciences Strategic Planning Working Group. This Group is formally organized under a charter that specifies the purpose of the Working Group as the development of an international strategic plan for the space life sciences, with periodic revisions as needed to keep the plan current. The plan will be policy-, not operations-oriented. The Working Group also may establish specific implementation teams to coordinate multilateral science policy in specific areas; such teams have been established for space station utilization, and for sharing of flight equipment.

  16. Meaning and Problems of Planning

    ERIC Educational Resources Information Center

    Brieve, Fred J.; Johnston, A. P.

    1973-01-01

    Examines the educational planning process. Discusses what planning is, how methodological planning can work in education, misunderstandings about planning, and difficulties in applying the planning methodology. (DN)

  17. An ergonomic approach to improve work conditions of older employees in social housing.

    PubMed

    Biquand, Sylvain; Heddad, Nadia

    2012-01-01

    French companies are legally required to develop action plans to improve employment and work conditions for older workers ("plans seniors"). These plans contain measures oriented towards recruiting, career evolution, skills developme1nt, knowledge transmission and improvement of work conditions. A tool for assessing work situations experienced by council buildings caretakers ("gardiens") was used in such a plan on behalf of the main agency of council housing in Paris, and we developed. This assessment tool was developed after ergonomic work analysis on a sample of 36 older caretakers (age > 57 y.o). The technical inspectors in charge of technical interventions on buildings and managing caretakers were trained to use the assessment tool and apply it to all caretakers aged 50 and over.

  18. Family Planning in Five Continents: Africa, America, Asia, Europe, Oceania. November 1975 Update.

    ERIC Educational Resources Information Center

    International Planned Parenthood Federation, London (England).

    This document gives highlights of the family planning situation in countries of the world, together with basic demographic statistics. Its purpose is to provide a quick reference source for those who work in family planning, population, and other related fields. Following a brief history of the pioneering work in family planning, population…

  19. Strategic planning applied to quality in asthma management for children.

    PubMed

    Goonan, K J; Healy, J M; Jordan, H S; Zazzali, J L; Horowitz, M

    1993-01-01

    This strategic plan translates the HCHP vision statement into a working plan for one major clinical condition--asthma in children. It is a working plan for clinicians and managers across specialties and levels. The results of the projects will improve in a measurable way significant clinical practice and outcomes, in keeping with the FY 1993 strategic goals.

  20. Emergent issues in forest plan revision: a dialogue

    Treesearch

    Susan I. Stewart; Pamela J. Jakes; Paul Monson

    1998-01-01

    Working with National Forest planners can raise many questions for social scientists regarding their role in planning or plan revision. Social scientists from the North Central Forest Experiment Station and the National Forest System Eastern Region debate 3 questions that continue to surface in their work with Forest Service managers on plan revision: first, what is...

  1. 45 CFR 287.70 - What are the plan requirements for the NEW Program?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Tribe will deliver work activities and services. (d) The format is left to the discretion of each NEW... 45 Public Welfare 2 2010-10-01 2010-10-01 false What are the plan requirements for the NEW Program... SERVICES THE NATIVE EMPLOYMENT WORKS (NEW) PROGRAM Plan Requirements § 287.70 What are the plan...

  2. 45 CFR 287.70 - What are the plan requirements for the NEW Program?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Tribe will deliver work activities and services. (d) The format is left to the discretion of each NEW... 45 Public Welfare 2 2011-10-01 2011-10-01 false What are the plan requirements for the NEW Program... SERVICES THE NATIVE EMPLOYMENT WORKS (NEW) PROGRAM Plan Requirements § 287.70 What are the plan...

  3. Future career plans of a cohort of senior doctors working in the National Health Service.

    PubMed

    Taylor, Kathryn; Lambert, Trevor; Goldacre, Michael

    2008-04-01

    To report on the future career plans of senior doctors working in the NHS. Postal questionnaires. All doctors who qualified in 1977 from all UK medical schools. Future plans and whether participants had any unmet needs for advice on how to put their future plans into effect. 25% definitely intended to continue with their current employment on the same basis until they retired; 75% hoped for change. A reduction in working hours was the most commonly desired change; but a substantial percentage also wanted changes in job content. 50% of respondents intended definitely (17%) or probably (33%) to work in the NHS to their normal retirement age; and 37% definitely (20%) or probably (17%) intended to retire early. 48% had made plans, in addition to the standard pension, to facilitate early retirement. The main factors given for considering early retirement were family reasons and wanting more time for leisure, a desire to maintain good health, excessive pressure of work, and disillusionment with NHS changes. A reduction in workload would be the greatest inducement to stay. 31% of respondents reported that they had unmet needs for advice about their future plans. Of these, about half were needs for advice about planning for retirement. Many senior NHS doctors would like to reduce their working hours. Less than a quarter definitely intend to work in the NHS to normal retirement age. Even for senior doctors, advice on career development is needed.

  4. Retirement planning and work-related variables in Chinese older nurses: A cross-sectional study.

    PubMed

    Liu, Peng-Cheng; Zhang, Huan-Huan; Zhang, Mei-Ling; Ying, Jie; Shi, Ying; Wang, Shou-Qi; Sun, Jiao

    2018-03-01

    To explore the situation of older nurses approaching retirement with regard to their retirement planning, and the relationship of their retirement planning behaviour with the job environment and job satisfaction under their current employment arrangements and other work-related variables. Nurse shortage has become a global phenomenon that can be alleviated by retaining older nurses in service. The Chinese government proposed the "Incremental Delay Retirement Age Policy." However, older nurses face delayed retirement but lack retirement plans. A cross-sectional questionnaire survey was conducted among a convenience sample of older retiring nurses (n = 152; 84.92% response rate) recruited from every department of four large general hospitals in Changchun, Jilin Province from June to August 2016. The majority of the respondents presented poor retirement planning (n = 122, 80.3%). The independent variables of information exchange with patients, teamwork and personal growth and development explained approximately 16.6% of the variance in retirement planning. Nurse-patient communication and personal growth and development can promote retirement planning, but teamwork is negatively related to retirement planning. Retirement planning by Chinese older nurses is related to certain work-related variables. However, many other work-related variables were not associated with retirement planning and require further research. Overall, Chinese older retiring nurses must improve their retirement planning practices. © 2017 John Wiley & Sons Ltd.

  5. In the United States, a Mother's Plans for Infant Feeding Are Associated with Her Plans for Employment.

    PubMed

    Mirkovic, Kelsey R; Perrine, Cria G; Scanlon, Kelley S; Grummer-Strawn, Laurence M

    2014-08-01

    The American Academy of Pediatrics recommends 6 months of exclusive breastfeeding, however, only 16% of US infants meet this recommendation. Shorter exclusive/predominant breastfeeding durations have been observed from women who return to work early and/or full-time. We assessed the relationship between prenatal plans for maternity leave duration and return to full-time/part-time status and plans for exclusive breastfeeding. This study included 2348 prenatally employed women from the Infant Feeding Practices Study II (2005-2007) who planned to return to work in the first year postpartum. Bivariate analysis and logistic regression were used to describe the association of maternity leave duration and return status with plans for infant feeding. Overall, 59.5% of mothers planned to exclusively breastfeed in the first few weeks. Mothers planning to return to work within 6 weeks had 0.60 times the odds (95% confidence interval [CI], 0.46-0.77) and mothers planning to return between 7 and 12 weeks had 0.72 times the odds (95% CI, 0.56-0.92) of planning to exclusively breastfeed compared with mothers who were planning to return after 12 weeks. Prenatal plans to return full-time (≥ 30 hours/week vs part-time) were also associated with lower odds of planning to exclusively breastfeed (adjusted odds ratio = 0.61; 95% CI, 0.51-0.77). Mothers planning to return to work before 12 weeks and/or full-time were less likely to plan to exclusively breastfeed. Longer maternity leave and/or part-time return schedules may increase the proportion of mothers who plan to exclusively breastfeed. © International Lactation Consultant Association 2014.

  6. Transportation Planning and Research : ANNUAL WORK PROGRAM AND COST ESTIMATE, 2018

    DOT National Transportation Integrated Search

    2018-01-01

    This document is the section-by-section ANNUAL WORK PROGRAM AND COST ESTIMATE for the agency whose MISSION is to provide excellence in transportation planning through an inclusive and comprehensive planning process that provides products, services, a...

  7. Work-Family Planning Attitudes among Emerging Adults

    ERIC Educational Resources Information Center

    Basuil, Dynah A.; Casper, Wendy J.

    2012-01-01

    Using social learning theory as a framework, we explore two sets of antecedents to work and family role planning attitudes among emerging adults: their work-family balance self-efficacy and their perceptions of their parents' work-to-family conflict. A total of 187 college students completed a questionnaire concerning their work-family balance…

  8. Work environment perceptions following relocation to open-plan offices: A twelve-month longitudinal study.

    PubMed

    Bergström, Jessica; Miller, Michael; Horneij, Eva

    2015-01-01

    A workplace's design can have various positive or negative effects on the employees and since the 1970s the advantages and disadvantages of open-plan offices have been discussed. The aim of this study was to investigate perceived health, work environment and self-estimated productivity one month before and at three, six and twelve months after relocation from individual offices to an open-plan office environment. Employees from three departments within the same company group and who worked with relatively similar tasks and who were planned to be relocated from private offices to open-plan offices were invited to participate. Questionnaires comprising items from The Salutogenic Health Indicator Scale, The Work Experience Measurement Scale, the questionnaire by Brennan et al. about perceived performance and one question from the Work Ability Index were sent to participants one month before relocation (baseline) to open-plan offices and then at three, six and twelve months after relocation. At baseline, 82 questionnaires were sent out. The response rate was 85%. At the follow-ups 77-79 questionnaires were sent out and the response-rate was 70%-81%. At follow-ups, perceived health, job satisfaction and performance had generally deteriorated. The results of the study indicate that employees' perception of health, work environment and performance decreased during a 12 month period following relocation from individual offices to open-plan offices.

  9. HAZWOPER work plan and site safety and health plan for the Alpha characterization project at the solid waste storage area 4 bathtubbing trench at Oak Ridge National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-07-01

    This work plan/site safety and health plan is for the alpha sampling project at the Solid Waste Storage Area 4 bathtubbing trench. The work will be conducted by the Oak Ridge National Laboratory (ORNL) Environmental Sciences Division and associated ORNL environmental, safety, and health support groups. This activity will fall under the scope of 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response (HAZWOPER). The purpose of this document is to establish health and safety guidelines to be followed by all personnel involved in conducting work for this project. Work will be conducted in accordance with requirements as stipulated inmore » the ORNL HAZWOPER Program Manual and applicable ORNL; Martin Marietta Energy Systems, Inc.; and U.S. Department of Energy policies and procedures. The levels of protection and the procedures specified in this plan are based on the best information available from historical data and preliminary evaluations of the area. Therefore, these recommendations represent the minimum health and safety requirements to be observed by all personnel engaged in this project. Unforeseeable site conditions or changes in scope of work may warrant a reassessment of the stated protection levels and controls. All adjustments to the plan must have prior approval by the safety and health disciplines signing the original plan.« less

  10. Joint Planning and Development Office Work Plan FY10

    DTIC Science & Technology

    2010-01-01

    IPSA ) Division will make refinements to the NextGen Portfolio Analysis. In addition, IPSA will work with the Department of Defense (DoD) to define and...Submitted Interagency Portfolio and Systems Analysis ( IPSA ) DRAFT DoD Portfolio Analysis Criteria BASELINE DoD Portfolio Analysis Criteria DRAFT...WG Work Plan Review Prototype Capability Selected and Defined CHAs Complete Safety Metrics for IPSA Complete FINAL Prototype Report FINAL

  11. Three Year Work Plan (2007--10) of the IUHPE Northern Part of the Western Pacific Region.

    PubMed

    Nakahara, Toshitaka

    2008-09-01

    The article presents the work plan of the Vice President for the Northern Part of the Western Pacific Region of the IUHPE. The highlights of the plan include, firstly, the organization of the First Asia-Pacific Conference on Health Promotion and Health Education, which will take place in July 2009. Secondly, the plan proposes the establishment of a liaison office and an Internet journal to facilitate collaboration among individuals, groups and organizations working in health promotion and education in this culturally and linguistically diverse region.

  12. OPTIMIZATION OF IN-SITU THERMAL REMEDIATION: THE LORING AFB STEAM INJECTION PROJECT EXAMPLE

    EPA Science Inventory

    Environmental remediation programs require that adequate planning be done before field work for characterization or remediation is undertaken. However, the heterogeneous nature of the subsurface can often thwart our best planning efforts. More recently, dynamic work plans which...

  13. Final Work Plan: Targeted Investigation at York, Nebraska

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, Lorraine M.

    The targeted investigation at York will be implemented in phases, so that data collected and interpretations developed at each stage of the program can be evaluated to guide subsequent phases most effectively. Section 2 of this Work Plan presents a brief overview of the York site, its geologic and hydrologic setting, and the previous CCC/USDA investigations. Section 3, outlines the proposed technical program for the targeted investigation, and Section 4 describes the investigative methods to be employed. A community relations plan is in Section 5, and Section 6 includes health and safety information. In addition to this site-specific Work Plan,more » the Master Work Plan (Argonne 2002) developed by Argonne for CCC/USDA investigations in Nebraska should be consulted for complete details of the methods and procedures to be used at York.« less

  14. Exclusive breastfeeding plan of pregnant Southeast Asian women: what encourages them?

    PubMed

    Idris, Nikmah Salamia; Sastroasmoro, Sudigdo; Hidayati, Fatimah; Sapriani, Irma; Suradi, Rulina; Grobbee, Diederick E; Uiterwaal, Cuno S P M

    2013-06-01

    This study investigated factors involved in breastfeeding planning of pregnant Asian women. A cross-sectional study was conducted on 207 pregnant women visiting the Budi Kemuliaan Hospital, Jakarta, Indonesia, between June and August 2011. The planned breastfeeding duration and determinants were sought using a standardized self-reported questionnaire. Most subjects had low income (84.1%) and education (79.7%). Women who had been informed about breastfeeding had a higher likelihood to plan longer (≥6 months) breastfeeding (odds ratio [OR] 1.97; 95% confidence interval [CI] 1.04-3.75; p=0.04), whereas women who had breastfed previous children over a shorter period had a lower likelihood (OR 0.26; 95% CI 0.11-0.59; p=0.001). Age, low education level, first pregnancy, and low income had no association with breastfeeding plans. Working mothers who had to return to work before 6 months and worked for >8 hours/day were less likely to plan longer breastfeeding (OR 0.14; 95% CI 0.02-0.83; p=0.03 vs. OR 0.53; 95% CI 0.17-1.63; p=0.27), whereas those intending to express their milk were more likely to breastfeed longer (OR 16.85; 95% CI 4.21-67.48; p<0.001). Planning of prolonged breastfeeding has little to do with maternal age, education, or number of pregnancies. However, mothers who work, who had previously breastfed for a short period, and who are not well informed about breastfeeding tend to plan shorter breastfeeding. Among mothers who work, it is the length of maternal leave and required working hours that determine the plans.

  15. Novel technique for tracking manpower and work packages: a useful tool for the team and management

    NASA Astrophysics Data System (ADS)

    Gill, R.; Gracia, G.; Lupton, R. H.; O'Mullane, W.

    2014-08-01

    In these times of austerity it is becoming more and more important to justify the need for manpower to management. Additionally, with the fast pace of today's projects the need for tools that facilitate teams to not only plan, but also track their work, are essential. The practice of planning work packages and the associated manpower has been about for a while but little is done to really cross-check that planning against reality. In this paper these elements are brought together through a number of tools that make up the end to end process of planning, tracking and reporting of work package progress and manpower usage.

  16. [The effect of self-determination on time perspective and child-care anxiety].

    PubMed

    Miyamoto, Junko

    2013-06-01

    This study examines the effect of self-determination on time perspectives and child-care anxiety from a viewpoint of life course. A total of 1,726 mothers with small children participated in a questionnaire survey. They were classified into four groups based on their planned life courses: mothers who work; mothers who stopped working, but plan on returning to work; mothers who don't want to work and plan to stay at home; and mothers who stopped working, but plan on returning to work when their children grow up. Child-care anxiety was classified into four categories: (a) sense of stagnation and sacrifice, (b) fatigue, (c) diffidence, (d) feeling disaffection. The results show that fulfillment associated with child-care anxiety exists for all groups and factors of child-care anxiety, and that fulfillment was influenced by differences between self-determination and self-determination desires. The effect of self-determination on time perspectives and child-care anxiety differed between groups. It is suggested that society should provide different support to mothers with small children and child-care anxiety related to their different planned life courses.

  17. 50. OUTLET WORKS: OUTLET STRUCTURE PLAN AND SECTIONS. Sheet ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    50. OUTLET WORKS: OUTLET STRUCTURE - PLAN AND SECTIONS. Sheet C-1, September, 1939. File no. SA 343/50. - Prado Dam, Outlet Works, Santa Ana River near junction of State Highways 71 & 91, Corona, Riverside County, CA

  18. 38. OUTLET WORKS: CONTROL HOUSE PLAN AND ELEVATIONS. Sheet ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    38. OUTLET WORKS: CONTROL HOUSE - PLAN AND ELEVATIONS. Sheet 32, August 20, 1938. File no. SA 121/71. - Prado Dam, Outlet Works, Santa Ana River near junction of State Highways 71 & 91, Corona, Riverside County, CA

  19. 43. OUTLET WORKS: SERVICE BRIDGE PLAN AND ELEVATION. Sheet ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    43. OUTLET WORKS: SERVICE BRIDGE - PLAN AND ELEVATION. Sheet 37, August 20, 1938. File no. SA 121/76. - Prado Dam, Outlet Works, Santa Ana River near junction of State Highways 71 & 91, Corona, Riverside County, CA

  20. 31. OUTLET WORKS: INTAKE PLAN AND SECTIONS. Sheet 21, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    31. OUTLET WORKS: INTAKE - PLAN AND SECTIONS. Sheet 21, August 20, 1938. File no. SA 121/60. - Prado Dam, Outlet Works, Santa Ana River near junction of State Highways 71 & 91, Corona, Riverside County, CA

  1. Human-Automation Integration: Principle and Method for Design and Evaluation

    NASA Technical Reports Server (NTRS)

    Billman, Dorrit; Feary, Michael

    2012-01-01

    Future space missions will increasingly depend on integration of complex engineered systems with their human operators. It is important to ensure that the systems that are designed and developed do a good job of supporting the needs of the work domain. Our research investigates methods for needs analysis. We included analysis of work products (plans for regulation of the space station) as well as work processes (tasks using current software), in a case study of Attitude Determination and Control Officers (ADCO) planning work. This allows comparing how well different designs match the structure of the work to be supported. Redesigned planning software that better matches the structure of work was developed and experimentally assessed. The new prototype enabled substantially faster and more accurate performance in plan revision tasks. This success suggests the approach to needs assessment and use in design and evaluation is promising, and merits investigatation in future research.

  2. 33 CFR 276.7 - Procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... will include full description of planned work, plans, sketches, and similar engineering data and... engineering adequacy of the local proposal and its relation to the possible selected Federal Plan and... Engineers—of the Assistant Secretary of the Army (Civil Works) by forwarding a copy of the draft survey...

  3. 33 CFR 276.7 - Procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... will include full description of planned work, plans, sketches, and similar engineering data and... engineering adequacy of the local proposal and its relation to the possible selected Federal Plan and... Engineers—of the Assistant Secretary of the Army (Civil Works) by forwarding a copy of the draft survey...

  4. 33 CFR 276.7 - Procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... will include full description of planned work, plans, sketches, and similar engineering data and... engineering adequacy of the local proposal and its relation to the possible selected Federal Plan and... Engineers—of the Assistant Secretary of the Army (Civil Works) by forwarding a copy of the draft survey...

  5. 33 CFR 276.7 - Procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... will include full description of planned work, plans, sketches, and similar engineering data and... engineering adequacy of the local proposal and its relation to the possible selected Federal Plan and... Engineers—of the Assistant Secretary of the Army (Civil Works) by forwarding a copy of the draft survey...

  6. 33 CFR 276.7 - Procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... will include full description of planned work, plans, sketches, and similar engineering data and... engineering adequacy of the local proposal and its relation to the possible selected Federal Plan and... Engineers—of the Assistant Secretary of the Army (Civil Works) by forwarding a copy of the draft survey...

  7. Functional Behavioral Assessments and Behavior Support Plans for Work-Based Learning

    ERIC Educational Resources Information Center

    Kittelman, Angus; Wagner Bromley, Katherine; Mazzotti, Valerie L.

    2016-01-01

    Work experiences are linked to positive post-school outcomes for youth and young adults with disabilities. Unfortunately, students who struggle to manage conflict and challenges in work settings have a difficult time maintaining employment. Though ecological assessments are used to create supported work plans surrounding socially inappropriate…

  8. 45 CFR 261.63 - When is a State's Work Verification Plan due?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Plan for validating work activities reported in the TANF Data Report and, if applicable, the SSP-MOE... procedures for TANF or SSP-MOE work activities or its internal controls for ensuring a consistent measurement...

  9. Four-phase or two-phase signal plan? A study on four-leg intersection by cellular automaton simulations

    NASA Astrophysics Data System (ADS)

    Jin, Cheng-Jie; Wang, Wei; Jiang, Rui

    2016-08-01

    The proper setting of traffic signals at signalized intersections is one of the most important tasks in traffic control and management. This paper has evaluated the four-phase traffic signal plans at a four-leg intersection via cellular automaton simulations. Each leg consists of three lanes, an exclusive left-turn lane, a through lane, and a through/right-turn lane. For a comparison, we also evaluate the two-phase signal plan. The diagram of the intersection states in the space of inflow rate versus turning ratio has been presented, which exhibits four regions: In region I/II/III, congestion will propagate upstream and laterally and result in queue spillover with both signal plans/two-phase signal plan/four-phase signal plan, respectively. Therefore, neither signal plan works in region I, and only the four-phase signal plan/two-phase signal plan works in region II/III. In region IV, both signal plans work, but two-phase signal plan performs better in terms of average delays of vehicles. Finally, we study the diagram of the intersection states and average delays in the asymmetrical configurations.

  10. As They Liked It: The Tragical-Comical-Pastoral Drama of Elizabethan Theatre. Curriculum Projects. The Huntington Theatre Company's Master Works Study in Shakespeare.

    ERIC Educational Resources Information Center

    Huntington Theatre Co., Boston, MA.

    Developed by the participants of the Huntington Theatre Company's Master Works Study in Shakespeare, this collection presents single lesson plans and unit plans for teaching Elizabethan drama. The collection presents 12 lesson plans (spanning one or a few days of instruction) and 15 unit plans (ranging over several weeks) suitable for secondary…

  11. Texas Quality Workforce Planning: 1993 Key Industries and Targeted Occupations for Texas' 24 Quality Work Force Planning Regions.

    ERIC Educational Resources Information Center

    Texas State Dept. of Commerce, Austin.

    In 1993, Texas' 24 quality work force planning committees used a state-developed targeted occupations planning methodology to identify key industries and targeted occupations with the greatest potential for job openings in their respective regions. Between 11 and 20 key industries (13.5 on average) were identified for each region. The following 10…

  12. 20 CFR 1002.5 - What definitions apply to USERRA?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... than wages or salary for work performed) that accrues to the employee because of an employment contract... pension plan, health plan, or employee stock ownership plan, insurance coverage and awards, bonuses... wages for work performed, or that has control over employment opportunities, including— (i) A person...

  13. 29. OUTLET WORKS: GENERAL PLAN AND SECTIONS. Sheet A1, date ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. OUTLET WORKS: GENERAL PLAN AND SECTIONS. Sheet A-1, date stamped January, 1939. File no. SA 949/80. - Prado Dam, Outlet Works, Santa Ana River near junction of State Highways 71 & 91, Corona, Riverside County, CA

  14. 48 CFR 970.1100-1 - Performance-based contracting.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... methods of accomplishing the work; use measurable (i.e., terms of quality, timeliness, quantity) performance standards and objectives and quality assurance surveillance plans; provide performance incentives... work and other documents used to establish work requirements. (d) Quality assurance surveillance plans...

  15. 48 CFR 970.1100-1 - Performance-based contracting.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... methods of accomplishing the work; use measurable (i.e., terms of quality, timeliness, quantity) performance standards and objectives and quality assurance surveillance plans; provide performance incentives... work and other documents used to establish work requirements. (d) Quality assurance surveillance plans...

  16. 48 CFR 970.1100-1 - Performance-based contracting.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... methods of accomplishing the work; use measurable (i.e., terms of quality, timeliness, quantity) performance standards and objectives and quality assurance surveillance plans; provide performance incentives... work and other documents used to establish work requirements. (d) Quality assurance surveillance plans...

  17. Individualism-Collectivism: Links to Occupational Plans and Work Values

    ERIC Educational Resources Information Center

    Hartung, Paul J.; Fouad, Nadya A.; Leong, Frederick T. L.; Hardin, Erin E.

    2010-01-01

    Individualism-collectivism (IC) constitutes a cultural variable thought to influence a wide variety of variables including career planning and decision making. To examine this possibility, college students (216 women, 106 men, 64% racial-ethnic minorities) responded to measures of IC, occupational plans, and work values. Multivariate analysis of…

  18. Bottom Up Succession Planning Works Better.

    ERIC Educational Resources Information Center

    Stevens, Paul

    Most succession planning practices are based on the premise that ambitious people have and want only one career direction--upwardly mobile. However, employees have 10 career direction options at any stage of their working lives. A minority want the career action requiring promotion. Employers with a comprehensive career planning support program…

  19. School Working Conditions and Changes in Student Teachers' Planned Persistence in Teaching

    ERIC Educational Resources Information Center

    Shirrell, Matthew; Reininger, Michelle

    2017-01-01

    This study examines the relationship between the working conditions of student teaching schools and changes in student teachers' planned persistence in teaching. Planned persistence (and a related construct, initial commitment) is an important predictor of initial entry (Rots, Aelterman, Vlerick, & Vermeulen, 2007) and actual persistence in…

  20. 32 CFR 644.8 - Planning and scheduling real estate activities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.8 Planning and scheduling... Memoranda; determination of final project boundaries; and preliminary real estate work to the point where... estate activities of the Corps are extremely sensitive, since they disrupt the lives of individuals and...

  1. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2102 Water quality management planning. Before grant assistance can be awarded for any treatment works project, the Regional... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Water quality management planning. 35...

  2. Formulation of consumables management models. Development approach for the mission planning processor working model

    NASA Technical Reports Server (NTRS)

    Connelly, L. C.

    1977-01-01

    The mission planning processor is a user oriented tool for consumables management and is part of the total consumables subsystem management concept. The approach to be used in developing a working model of the mission planning processor is documented. The approach includes top-down design, structured programming techniques, and application of NASA approved software development standards. This development approach: (1) promotes cost effective software development, (2) enhances the quality and reliability of the working model, (3) encourages the sharing of the working model through a standard approach, and (4) promotes portability of the working model to other computer systems.

  3. Engineering Task Plan for the Ultrasonic Inspection of Hanford Double Shell Tanks (DST) FY2000

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    JENSEN, C.E.

    2000-01-10

    This document facilitates the ultrasonic examination of Hanford double-shell tanks. Included are a plan for engineering activities (individual responsibilities), plan for performance demonstration testing, and a plan for field activities (tank inspection). Also included are a Statement of Work for contractor performance of the work and a protocol to be followed should tank flaws that exceed the acceptance criteria be discovered.

  4. B Plant Complex preclosure work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ADLER, J.G.

    1999-02-02

    This preclosure work plan describes the condition of the dangerous waste treatment storage, and/or disposal (TSD) unit after completion of the B Plant Complex decommissioning Transition Phase preclosure activities. This description includes waste characteristics, waste types, locations, and associated hazards. The goal to be met by the Transition Phase preclosure activities is to place the TSD unit into a safe and environmentally secure condition for the long-term Surveillance and Maintenance (S&M) Phase of the facility decommissioning process. This preclosure work plan has been prepared in accordance with Section 8.0 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement)more » (Ecology et al. 1996). The preclosure work plan is one of three critical Transition Phase documents, the other two being: B Plant End Points Document (WHC-SD-WM-TPP-054) and B Plant S&M plan. These documents are prepared by the U.S. Department of Energy, Richland Operations Office (DOE-RL) and its contractors with the involvement of Washington State Department of Ecology (Ecology). The tanks and vessels addressed by this preclosure work plan are limited to those tanks end vessels included on the B Plant Complex Part A, Form 3, Permit Application (DOE/RL-88-21). The criteria for determining which tanks or vessels are in the Part A, Form 3, are discussed in the following. The closure plan for the TSD unit will not be prepared until the Disposition Phase of the facility decommissioning process is initiated, which follows the long-term S&M Phase. Final closure will occur during the Disposition Phase of the facility decommissioning process. The Waste Encapsulation Storage Facility (WESF) is excluded from the scope of this preclosure work plan.« less

  5. Social Work Assessment Notes: A Comprehensive Outcomes-Based Hospice Documentation System.

    PubMed

    Hansen, Angela Gregory; Martin, Ellen; Jones, Barbara L; Pomeroy, Elizabeth C

    2015-08-01

    This article describes the development of an integrated psychosocial patient and caregiver assessment and plan of care for hospice social work documentation. A team of hospice social workers developed the Social Work Assessment Notes as a quality improvement project in collaboration with the information technology department. Using the Social Work Assessment Tool as an organizing framework, this comprehensive hospice social work documentation system is designed to integrate assessment, planning, and outcomes measurement. The system was developed to guide the assessment of patients' and caregivers' needs related to end-of-life psychosocial issues, to facilitate collaborative care plan development, and to measure patient- and family-centered outcomes. Goals established with the patient and the caregiver are documented in the plan of care and become the foundation for patient-centered, strengths-based interventions. Likert scales are used to assign numerical severity levels for identified issues and progress made toward goals and to track the outcome of social work interventions across nine psychosocial constructs. The documentation system was developed for use in an electronic health record but can be used for paper charting. Future plans include automated aggregate outcomes measurement to identify the most effective interventions and best practices in end-of-life care.

  6. Are planning, working memory, and inhibition associated with individual differences in preschool ADHD symptoms?

    PubMed

    Sonuga-Barke, Edmund J S; Dalen, Lindy; Daley, Dave; Remington, Bob

    2002-01-01

    The association between executive function (EF; planning, working memory, and inhibition) and individual differences in symptoms of attention deficit hyperactivity disorder (ADHD) was explored in a sample of preschool children. One hundred sixty children (between the ages of 3 years, 0 months and 5 years, 6 months), selected so as to oversample high ADHD scorers, performed 3 tasks previously shown to measure planning (Tower of London), working memory (Noisy Book) and inhibition ("Puppet Says..."). EF measures were reliable (kappa > .77) and were correlated with IQ (rs > .38) and age (rs > .59). Once IQ and age were controlled, planning and working memory (r = .41) were correlated. Planning and working memory were not correlated with inhibition (rs < .20). There was no association between ADHD and working memory or planning (rs < .12). There was a significant negative association between ADHD and conduct problems and inhibition (r = -.30 and r = -.25, respectively). Only the link with ADHD persisted after the effects of other factors were controlled for in a multiple regression. Specific deficits in inhibitory control rather than general EF deficits are associated with ADHD in the preschool period. This association is linear in nature, supporting the idea that ADHD is better seen as a continuum rather than a discrete category. This association provides evidence for Barkley's (1997) view that ADHD is underpinned by inhibitory deficits in the preschool period.

  7. Usefulness and engagement with a guided workbook intervention (WorkPlan) to support work related goals among cancer survivors.

    PubMed

    Schumacher, Lauren; Armaou, Maria; Rolf, Pauline; Sadhra, Steven; Sutton, Andrew John; Zarkar, Anjali; Grunfeld, Elizabeth A

    2017-10-04

    Returning to work after cancer is associated with improved physical and psychological functioning, but managing this return can be a challenging process. A workbook based intervention (WorkPlan) was developed to support return-to-work among cancer survivors. The aim of this study was to explore how participants using the workbook engaged with the intervention and utilised the content of the intervention in their plan to return-to-work. As part of a feasibility randomised controlled trial, 23 participants from the intervention group were interviewed 4-weeks post intervention. Interviews focussed on intervention delivery and data was analysed using Framework analysis. Participants revealed a sense of empowerment and changes in their outlook as they transitioned from patient to employee, citing the act of writing as a medium for creating their own return-to-work narrative. Participants found the generation of a return-to-work plan useful for identifying potential problems and solutions, which also served as a tool for aiding discussion with the employer on return-to-work. Additionally, participants reported feeling less uncertain and anxious about returning to work. Timing of the intervention in coordination with ongoing cancer treatments was crucial to perceived effectiveness; participants identified the sole or final treatment as the ideal time to receive the intervention. The self-guided workbook supports people diagnosed with cancer to build their communication and planning skills to successfully manage their return-to-work. Further research could examine how writing plays a role in this process. Current Controlled Trials ISRCTN56342476 . Retrospectively registered 14 October 2015.

  8. Planning and Measurement in School to Work Transition.

    ERIC Educational Resources Information Center

    Kooi, Beverly Y.

    An analysis, development, and research (ADR) approach for planning educational research and development programs was used as a model for planning the National Institute of Education's School-To-Work Transition Program. The ADR model is system oriented and utilizes an iterative approach in which research questions are raised as others are answered.…

  9. Perspectives and Plans for Graduate Studies. 8. Anthropology 1974.

    ERIC Educational Resources Information Center

    Council of Ontario Universities, Toronto.

    At the present time there are two graduate programs in anthropology in Ontario. An examination of the 3-year plans submitted in 1972 revealed that several universities in Ontario were proposing master's work in anthropology. It was decided to place master's work in anthropology under provisional embargo until a "mini-planning assessment"…

  10. A Reliability Simulator for Radiation-Hard Microelectronics Development

    DTIC Science & Technology

    1991-07-01

    1 3.0 PHASE II WORK PLANS ................................................................ 2... plan . The correlation experimental details including the devices utilized, the hot-carrier stressing and the wafer-level radiation correlation procedure...channel devices, and a new lifetime extrapolation method is demonstrated for p-channel devices. 3.0 PHASE II WORK PLANS The Phase 1I program consisted of

  11. FY 1987 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less

  12. Nebraska Work Based Learning Manual. Planning and Implementation Guides for Educators, Employers, Policymakers, and Parents.

    ERIC Educational Resources Information Center

    Nebraska State Dept. of Education, Lincoln.

    This manual contains a series of 10 detailed guides for school practitioners who are beginning to create work-based learning programs at their schools. Work-Based Learning Overview defines the different elements of work-based learning and describes the roles of program participants. Program Planning Guide offers suggestions about how to plan…

  13. Application of scenario analysis and multiagent technique in land-use planning: a case study on Sanjiang wetlands.

    PubMed

    Yu, Huan; Ni, Shi-Jun; Kong, Bo; He, Zheng-Wei; Zhang, Cheng-Jiang; Zhang, Shu-Qing; Pan, Xin; Xia, Chao-Xu; Li, Xuan-Qiong

    2013-01-01

    Land-use planning has triggered debates on social and environmental values, in which two key questions will be faced: one is how to see different planning simulation results instantaneously and apply the results back to interactively assist planning work; the other is how to ensure that the planning simulation result is scientific and accurate. To answer these questions, the objective of this paper is to analyze whether and how a bridge can be built between qualitative and quantitative approaches for land-use planning work and to find out a way to overcome the gap that exists between the ability to construct computer simulation models to aid integrated land-use plan making and the demand for them by planning professionals. The study presented a theoretical framework of land-use planning based on scenario analysis (SA) method and multiagent system (MAS) simulation integration and selected freshwater wetlands in the Sanjiang Plain of China as a case study area. Study results showed that MAS simulation technique emphasizing quantitative process effectively compensated for the SA method emphasizing qualitative process, which realized the organic combination of qualitative and quantitative land-use planning work, and then provided a new idea and method for the land-use planning and sustainable managements of land resources.

  14. Application of Scenario Analysis and Multiagent Technique in Land-Use Planning: A Case Study on Sanjiang Wetlands

    PubMed Central

    Ni, Shi-Jun; He, Zheng-Wei; Zhang, Cheng-Jiang; Zhang, Shu-Qing; Pan, Xin; Xia, Chao-Xu; Li, Xuan-Qiong

    2013-01-01

    Land-use planning has triggered debates on social and environmental values, in which two key questions will be faced: one is how to see different planning simulation results instantaneously and apply the results back to interactively assist planning work; the other is how to ensure that the planning simulation result is scientific and accurate. To answer these questions, the objective of this paper is to analyze whether and how a bridge can be built between qualitative and quantitative approaches for land-use planning work and to find out a way to overcome the gap that exists between the ability to construct computer simulation models to aid integrated land-use plan making and the demand for them by planning professionals. The study presented a theoretical framework of land-use planning based on scenario analysis (SA) method and multiagent system (MAS) simulation integration and selected freshwater wetlands in the Sanjiang Plain of China as a case study area. Study results showed that MAS simulation technique emphasizing quantitative process effectively compensated for the SA method emphasizing qualitative process, which realized the organic combination of qualitative and quantitative land-use planning work, and then provided a new idea and method for the land-use planning and sustainable managements of land resources. PMID:23818816

  15. Planning Under Continuous Time and Resource Uncertainty: A Challenge for AI

    NASA Technical Reports Server (NTRS)

    Bresina, John; Dearden, Richard; Meuleau, Nicolas; Smith, David; Washington, Rich; Clancy, Daniel (Technical Monitor)

    2002-01-01

    There has been considerable work in Al on decision-theoretic planning and planning under uncertainty. Unfortunately, all of this work suffers from one or more of the following limitations: 1) it relies on very simple models of actions and time, 2) it assumes that uncertainty is manifested in discrete action outcomes, and 3) it is only practical for very small problems. For many real world problems, these assumptions fail to hold. A case in point is planning the activities for a Mars rover. For this domain none of the above assumptions are valid: 1) actions can be concurrent and have differing durations, 2) there is uncertainty concerning action durations and consumption of continuous resources like power, and 3) typical daily plans involve on the order of a hundred actions. We describe the rover problem, discuss previous work on planning under uncertainty, and present a detailed. but very small, example illustrating some of the difficulties of finding good plans.

  16. FY 95 engineering work plan for the design reconstitution implementation action plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bigbee, J.D.

    Design reconstitution work is to be performed as part of an overall effort to upgrade Configuration Management (CM) at TWRS. WHC policy is to implement a program that is compliant with DOE-STD-1073-93, Guide for Operational Configuration Management Program. DOE-STD-1073 requires an adjunct program for reconstituting design information. WHC-SD-WM-CM-009, Design Reconstitution Program Plan for Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System, is the TWRS plan for meeting DOE-STD-1073 design reconstitution requirements. The design reconstitution plan is complex requiring significant time and effort for implementation. In order to control costs, and integrate the work into other TWRS activities,more » a Design Reconstitution Implementation Action Plan (DR IAP) will be developed, and approved by those organizations having ownership or functional interest in this activity.« less

  17. Applying Planning Algorithms to Argue in Cooperative Work

    NASA Astrophysics Data System (ADS)

    Monteserin, Ariel; Schiaffino, Silvia; Amandi, Analía

    Negotiation is typically utilized in cooperative work scenarios for solving conflicts. Anticipating possible arguments in this negotiation step represents a key factor since we can take decisions about our participation in the cooperation process. In this context, we present a novel application of planning algorithms for argument generation, where the actions of a plan represent the arguments that a person might use during the argumentation process. In this way, we can plan how to persuade the other participants in cooperative work for reaching an expected agreement in terms of our interests. This approach allows us to take advantages since we can test anticipated argumentative solutions in advance.

  18. Effects of acoustic environment on work in private office rooms and open-plan offices - longitudinal study during relocation.

    PubMed

    Kaarlela-Tuomaala, A; Helenius, R; Keskinen, E; Hongisto, V

    2009-11-01

    The aim was to determine how the perceived work environment, especially acoustic environment, and its effects differed in private office rooms and in open-plan offices. The subjects consisted of 31 workers who moved from private office rooms to open-plan offices and who answered the questionnaire before and after the relocation. Private office rooms were occupied only by one person while open-plan offices were occupied by more than 20 persons. Room acoustical descriptors showed a significant reduction in speech privacy after relocation. The noise level averaged over the whole work day did not change but the variability of noise level reduced significantly. Negative effects of acoustic environment increased significantly, including increased distraction, reduced privacy, increased concentration difficulties and increased use of coping strategies. Self-rated loss of work performance because of noise doubled. Cognitively demanding work and phone conversations were most distracted by noise. The benefits that are often associated with open-plan offices did not appear: cooperation became less pleasant and direct and information flow did not change. Nowadays, most office workers, independent of job type, are located in open-plan offices without the individual needs of privacy, concentration and interaction being analysed. This intervention study consisted of professional workers. Their work tasks mainly required individual efforts, and interaction between other workers was not of primary concern, although necessary. The results suggest that the open-plan office is not recommended for professional workers. Similar intervention studies should also be made for other job types.

  19. Focus on motivation in the work rehabilitation planning process: a qualitative study from the employer's perspective.

    PubMed

    Gard, Gunvor; Larsson, Agneta

    2003-09-01

    Since the working environment act was passed in 1991, employers in Sweden are to plan and control the working environment conditions in workplaces. They are responsible for organized rehabilitation at the workplace including the development of rehabilitation plans and a plan for interventions in order for a sick-listed client to be able to return to work. The aim of this study was to describe employers' experiences of how motivation can be improved in a work rehabilitation process. Qualitative interviews were performed with 10 employers who had employees that had taken part in a period of vocational rehabilitation at a rehabilitation center in the north of Sweden, over a 2-year period. The result showed that increased focus on motivation for change is needed in work rehabilitation. The clients' motivation for change could be improved by a focus on motivational conversations at the workplace aiming at motivation for change in their working and living conditions. The employers' power of initiative, competence, economic resources, and motivation are needed for creative solutions at the workplace.

  20. Drug Plan Coverage Rules

    MedlinePlus

    ... the first time Filling a prescription without your new plan card Costs for Medicare drug coverage Joining a health or drug plan How Part D works with other insurance Find health & drug plans Drug plan coverage rules Note Call your Medicare drug plan to find ...

  1. 7 CFR 1781.3 - Authorities, responsibilities, and delegation of authority.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AND WATERSHED (WS) LOANS AND ADVANCES § 1781.3 Authorities, responsibilities, and delegation of... developing WS and RCD area plans and for individual RCD measures or projects and watershed works of improvement. The watershed work plan for developing, operating, and maintaining watershed works of improvement...

  2. 7 CFR 1781.3 - Authorities, responsibilities, and delegation of authority.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AND WATERSHED (WS) LOANS AND ADVANCES § 1781.3 Authorities, responsibilities, and delegation of... developing WS and RCD area plans and for individual RCD measures or projects and watershed works of improvement. The watershed work plan for developing, operating, and maintaining watershed works of improvement...

  3. 7 CFR 1781.3 - Authorities, responsibilities, and delegation of authority.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AND WATERSHED (WS) LOANS AND ADVANCES § 1781.3 Authorities, responsibilities, and delegation of... developing WS and RCD area plans and for individual RCD measures or projects and watershed works of improvement. The watershed work plan for developing, operating, and maintaining watershed works of improvement...

  4. 7 CFR 1781.3 - Authorities, responsibilities, and delegation of authority.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AND WATERSHED (WS) LOANS AND ADVANCES § 1781.3 Authorities, responsibilities, and delegation of... developing WS and RCD area plans and for individual RCD measures or projects and watershed works of improvement. The watershed work plan for developing, operating, and maintaining watershed works of improvement...

  5. Site Safety Plan for Lawrence Livermore National Laboratory CERCLA investigations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bainer, R.; Duarte, J.

    1993-07-01

    The safety policy of LLNL is to take every reasonable precaution in the performance of work to protect the environment and the health and safety of employees and the public, and to prevent property damage. With respect to hazardous agents, this protection is provided by limiting human exposures, releases to the environment, and contamination of property to levels that are as low as reasonably achievable (ALARA). It is the intent of this Plan to supply the broad outline for completing environmental investigations within ALARA guidelines. It may not be possible to determine actual working conditions in advance of the work;more » therefore, planning must allow the opportunity to provide a range of protection based upon actual working conditions. Requirements will be the least restrictive possible for a given set of circumstances, such that work can be completed in an efficient and timely fashion. Due to the relatively large size of the LLNL Site and the different types of activities underway, site-specific Operational Safety Procedures (OSPs) will be prepared to supplement activities not covered by this Plan. These site-specific OSPs provide the detailed information for each specific activity and act as an addendum to this Plan, which provides the general plan for LLNL Main Site operation.« less

  6. A Working Plan for Treating the Engineering Faculty Shortage Problem.

    ERIC Educational Resources Information Center

    Shoup, Terry E., Ed.

    In view of the consequences of the engineering faculty shortage problem on engineering capabilities in the future in the United States, a working plan which will serve as a national agenda for prompt action has been developed. This plan involves the three key groups (federal government, academic community, industry) who have the vision,…

  7. Busy Brides and the Business of Family Life: The Wedding-Planning Industry and the Commodity Frontier

    ERIC Educational Resources Information Center

    Blakely, Kristin

    2008-01-01

    As work traditionally located in the private sphere, wedding planning, like other domestic functions, has become commodified. Building upon Hochschild's work on the commercialization of intimate life, this article explores the relationship of feminism to the commercial spirit of intimate life to understand wedding planning as a commodified…

  8. Effects of a workplace travel plan intervention encouraging active travel to work: outcomes from a three-year time-series study.

    PubMed

    Petrunoff, N; Wen, L M; Rissel, C

    2016-06-01

    To evaluate the effects of a three-year workplace travel plan intervention on increasing active travel to work. A time-series study with staff was conducted in 2011 (n = 804), 2012 (n = 904), 2013 (n = 872) and 2014 (n = 687). A travel plan was implemented at a large, outer-suburban worksite in Sydney, Australia. Implementation was assessed by reviewing annual reports including travel plan actions and their status. Annual cross-sectional on-line surveys assessed primary outcomes which included change in the proportion of staff travelling to work via active modes. Multivariate logistic regression was used to adjust for confounders. Strategies to encourage active travel were partially implemented. An average survey response rate was 23% (n = 817). The proportion of staff travelling actively to work increased by 4%-6% across intervention years compared to the baseline, and this increase was significant in 2012 (P = 0.04) and 2013 (P = 0.003). Compared to baseline, after adjusting for distances staff lived from work staff had 33% (95% CI 1%-74%) greater odds of travelling to work via active modes in 2012, and 50% (95% CI 15%-96%) greater odds in 2013. There was no evidence of change in physical activity levels. A workplace travel plan which only included strategies to encourage active travel to work achieved small but significant increases in active travel. Workplace travel plans appear to be a promising way to increase active travel to work. Copyright © 2016 The Royal Society for Public Health. All rights reserved.

  9. Education and Training for Work. Volume 1--Planning Programs.

    ERIC Educational Resources Information Center

    Campbell, Clifton P., Ed.

    This book, which is intended for practicing or aspiring instructors, curriculum developers, and others engaged in work force development at the secondary and postsecondary levels, contains eight papers explaining how to plan education and training for work. The following papers are included: "Determining the Market Demand for Skilled Workers"…

  10. Applying the Theory of Constraints to a Base Civil Engineering Operations Branch

    DTIC Science & Technology

    1991-09-01

    Figure Page 1. Typical Work Order Processing . .......... 7 2. Typical Job Order Processing . .......... 8 3. Typical Simplified In-Service Work Plan for...Customers’ Customer Request Service Planning Unit Production] Control Center Material Control Scheduling CE Shops Figure 1.. Typical Work Order Processing 7

  11. Business Planning as Pedagogy: Language and Control in a Changing Institutional Field.

    ERIC Educational Resources Information Center

    Oakes, Leslie S.; Townley, Barbara; Cooper, David J.

    1998-01-01

    Based on Pierre Bourdieu's work on power as symbolic violence, examines business planning's pedagogical function in Alberta, Canada's museum and cultural heritage sites. Control involves redirecting work and changing producers' identity and work understandings via construction of markets, consumers, and products. Control was achieved by pedagogic…

  12. Work and Family: How Managers Can Make a Difference.

    ERIC Educational Resources Information Center

    Collins, Ray; Magid, Renee Y.

    1990-01-01

    The work-family audit is a framework for employer planning of work-family policies and programs. The audit identifies key aspects of the labor force and community. Steps are identifying options, specifying objectives, planning for implementation, stating outcomes and benefits, and preparing to measure costs and benefits. (SK)

  13. Did the Great Recession influence retirement plans?

    PubMed

    Szinovacz, Maximiliane E; Davey, Adam; Martin, Lauren

    2015-04-01

    The recent recession constitutes one of the macro forces that may have influenced workers' retirement plans. We evaluate a multilevel model that addresses the influence of macro-, meso-, and micro-level factors on retirement plans, changes in these plans, and expected retirement age. Using data from Waves 8 and 9 of the Health and Retirement Study (N=2,618), we find that individuals with defined benefit plans are more prone to change toward plans to stop work before the stock market declined, whereas the opposite trend holds for those without pensions. Debts, ability to reduce work hours, and firm unionization also influenced retirement plans. Findings suggest retirement planning education may be particularly important for workers without defined pensions, especially in times of economic volatility. © The Author(s) 2014.

  14. What component of executive functions contributes to normal and impaired reading comprehension in young adults?

    PubMed

    Georgiou, George K; Das, J P

    2016-01-01

    The purpose of this study was two-fold: (a) to examine what component of executive functions (EF) - planning and working memory - predicts reading comprehension in young adults (Study 1), and (b) to examine if less skilled comprehenders experience deficits in the EF components (Study 2). In Study 1, we assessed 178 university students (120 females; mean age=21.82 years) on planning (Planned Connections, Planned Codes, and Planned Patterns), working memory (Listening Span, Digit Span Backward, and Digit Memory), and reading comprehension (Nelson-Denny Reading Test). The results of structural equation modeling indicated that only planning was a significant predictor of reading comprehension. In Study 2, we assessed 30 university students with a specific reading comprehension deficit (19 females; mean age=23.01 years) and 30 controls (18 females; mean age=22.77 years) on planning (Planned Connections and Crack the Code) and working memory (Listening Span and Digit Span Backward). The results showed that less skilled comprehenders performed significantly poorer than controls only in planning. Taken together, the findings of both studies suggest that planning is the preeminent component of EF that is driving its relationship with reading comprehension in young adults. Copyright © 2015 Elsevier Ltd. All rights reserved.

  15. How Home Health Nurses Plan Their Work Schedules: A Qualitative Descriptive Study.

    PubMed

    Irani, Elliane; Hirschman, Karen B; Cacchione, Pamela Z; Bowles, Kathryn H

    2018-06-12

    To describe how home health nurses plan their daily work schedules and what challenges they face during the planning process. Home health nurses are viewed as independent providers and value the nature of their work because of the flexibility and autonomy they hold in developing their work schedules. However, there is limited empirical evidence about how home health nurses plan their work schedules, including the factors they consider during the process and the challenges they face within the dynamic home health setting. Qualitative descriptive design. Semi-structured interviews were conducted with 20 registered nurses who had greater than 2 years of experience in home health and were employed by one of the three participating home health agencies in the mid-Atlantic region of the United States. Data were analyzed using conventional content analysis. Four themes emerged about planning work schedules and daily itineraries: identifying patient needs to prioritize visits accordingly, partnering with patients to accommodate their preferences, coordinating visit timing with other providers to avoid overwhelming patients, and working within agency standards to meet productivity requirements. Scheduling challenges included readjusting the schedule based on patient needs and staffing availability, anticipating longer visits, and maintaining continuity of care with patients. Home health nurses make autonomous decisions regarding their work schedules while considering specific patient and agency factors, and overcome challenges related to the unpredictable nature of providing care in a home health setting. Future research is needed to further explore nurse productivity in home health and improve home health work environments. Home health nurses plan their work schedules to provide high quality care that is patient-centered and timely. The findings also highlight organizational priorities to facilitate continuity of care and support nurses while alleviating the burnout associated with high productivity requirements. This article is protected by copyright. All rights reserved. This article is protected by copyright. All rights reserved.

  16. Streamlining Collaborative Planning in Spacecraft Mission Architectures

    NASA Technical Reports Server (NTRS)

    Misra, Dhariti; Bopf, Michel; Fishman, Mark; Jones, Jeremy; Kerbel, Uri; Pell, Vince

    2000-01-01

    During the past two decades, the planning and scheduling community has substantially increased the capability and efficiency of individual planning and scheduling systems. Relatively recently, research work to streamline collaboration between planning systems is gaining attention. Spacecraft missions stand to benefit substantially from this work as they require the coordination of multiple planning organizations and planning systems. Up to the present time this coordination has demanded a great deal of human intervention and/or extensive custom software development efforts. This problem will become acute with increased requirements for cross-mission plan coordination and multi -spacecraft mission planning. The Advanced Architectures and Automation Branch of NASA's Goddard Space Flight Center is taking innovative steps to define collaborative planning architectures, and to identify coordinated planning tools for Cross-Mission Campaigns. Prototypes are being developed to validate these architectures and assess the usefulness of the coordination tools by the planning community. This presentation will focus on one such planning coordination too], named Visual Observation Layout Tool (VOLT), which is currently being developed to streamline the coordination between astronomical missions

  17. Response to Comments for DCM Work Plan Risk Assessment

    EPA Pesticide Factsheets

    This document summarizes the public and external peer review comments that the EPA’s Office of Pollution Prevention and Toxics (OPPT) received for the draft work plan risk assessment for dichloromethane (DCM).

  18. 7 CFR 25.403. - Ongoing 2-year work plan requirement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... the start of the applicable 2-year period. (c) The 2-year work plan must include the following... Federal, State and local governments, non-profit organizations, foundations, private businesses, and any...

  19. The importance of work or productive activity in life care planning and case management.

    PubMed

    Reid, Christine; Riddick-Grisham, Susan

    2015-01-01

    The importance of work or productive activity for the well-being, community integration, and quality of life of people living with disabilities is addressed, with implications for life care planning and case management. The role of work or productive activity in our society, and consequences of deprivation if rehabilitation services do not address vocational effects of disabilities, is explored. A continuum of productivity options is introduced; types of vocational rehabilitation assessment processes and interventions are described. The role of vocational rehabilitation services in life care planning and case management is discussed, focusing on quality of life for people living with disabilities. Rehabilitation and health care professionals should understand the importance of work or other productive activity, and support the development of appropriate plans to address those needs among people who have disabilities.

  20. [Family and career planning in young physicians].

    PubMed

    Buddeberg-Fischer, Barbara; Stamm, Martina; Klaghofer, Richard

    2008-01-01

    The study investigates in what way physicians integrate their desire to have children into their career planning. Within the framework of a prospective cohort study of Swiss medical school graduates on career development of young physicians, beginning in 2001, 534 participants (285 women, 249 men) were assessed in January 2007, in terms of having children, planning to have children, the career aspired to and the work-family balance used or planned. Among the study participants, 19% (54) of the women and 24% (59) of the men have children. Of the others 88% plan to start a family in the future. Female physicians with children are less advanced in their careers than women without children; for male physicians no such difference can be observed. Of the female physicians with children or the desire for children 42% aspire to work in a practice, 28% to a clinical and only 4% to an academic career. Of the male physicians with children or the desire for children one third aspire to work in a practice, one third to a clinical and 14% to an academic career. The preferred model of work repartition of female physicians with children is father full time/mother part time or both parents part time; the preferred model of male physicians is father full time/mother part time or not working. Children are an important factor in the career and life planning of physicians, female physicians paying more attention to an even work-family balance than male physicians. Copyright 2008 S. Karger AG, Basel.

  1. SU-E-T-632: Preliminary Study On Treating Nose Skin Using Energy and Intensity Modulated Electron Beams with Monte Carlo Based Dose Calculations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jin, L; Eldib, A; Li, J

    Purpose: Uneven nose surfaces and air cavities underneath and the use of bolus present complexity and dose uncertainty when using a single electron energy beam to plan treatments of nose skin with a pencil beam-based planning system. This work demonstrates more accurate dose calculation and more optimal planning using energy and intensity modulated electron radiotherapy (MERT) delivered with a pMLC. Methods: An in-house developed Monte Carlo (MC)-based dose calculation/optimization planning system was employed for treatment planning. Phase space data (6, 9, 12 and 15 MeV) were used as an input source for MC dose calculations for the linac. To reducemore » the scatter-caused penumbra, a short SSD (61 cm) was used. Our previous work demonstrates good agreement in percentage depth dose and off-axis dose between calculations and film measurement for various field sizes. A MERT plan was generated for treating the nose skin using a patient geometry and a dose volume histogram (DVH) was obtained. The work also shows the comparison of 2D dose distributions between a clinically used conventional single electron energy plan and the MERT plan. Results: The MERT plan resulted in improved target dose coverage as compared to the conventional plan, which demonstrated a target dose deficit at the field edge. The conventional plan showed higher dose normal tissue irradiation underneath the nose skin while the MERT plan resulted in improved conformity and thus reduces normal tissue dose. Conclusion: This preliminary work illustrates that MC-based MERT planning is a promising technique in treating nose skin, not only providing more accurate dose calculation, but also offering an improved target dose coverage and conformity. In addition, this technique may eliminate the necessity of bolus, which often produces dose delivery uncertainty due to the air gaps that may exist between the bolus and skin.« less

  2. The Impact of Appearance Management Training, Work Status, and Plans after High School on Opinions Regarding Appearance at Work and School

    ERIC Educational Resources Information Center

    Freeburg, Beth Winfrey; Arnett, Sally E.

    2010-01-01

    The purpose of this study was to measure the effect of appearance management training, work status, and plans after high school on students' opinions about appearance at school and at work. A nonprobability sample of 132 high school juniors and seniors in a consumer education class were administered the Appearance Management Survey before and…

  3. Facility Planning in the Construction Grants Program. Instructor Guide. Working for Clean Water: An Information Program for Advisory Groups.

    ERIC Educational Resources Information Center

    Buskirk, E. Drannon, Jr.; Cole, Charles A.

    Wastewater facility planning is an essential component of the federal construction grants process. Presented in this instructor's guide is a one-hour presentation on facility planning intended for citizen advisory groups. The guide is part of the Working for Clean Water Project, which also includes a supplementary audiovisual presentation.…

  4. Non-Profit/Higher Education Project Management Series: The Project Plan

    ERIC Educational Resources Information Center

    Burgher, Karl E.; Snyder, Michael

    2012-01-01

    This is the second installment of the AACRAO management series focusing on project management in the academy. In this article, the authors focus on white papers (often called charters, briefs, or fact sheets) and their partner, the work plan. The work plan is a detailed document that defines each aspect of a project. It is often preceded by a…

  5. Perspectives and Plans for Graduate Studies. 11. Engineering 1974. E. Industrial Engineering and Systems Design. Report No. 74-22.

    ERIC Educational Resources Information Center

    Ontario Council on Graduate Studies, Toronto. Advisory Committee on Academic Planning.

    On the instruction of the Council of Ontario Universities, the Advisory Committee on Academic Planning in cooperation with the Committee of Ontario Deans of Engineering has conducted a planning assessment for doctoral work in industrial engineering and systems design. Recommendations for doctoral work in engineering studies are presented.…

  6. Delineation of State Agency, Accreditation, and Institutional Responsibilities. Improving Community College Evaluation and Planning: Project Working Paper Number Four.

    ERIC Educational Resources Information Center

    California Community Colleges, Sacramento. Office of the Chancellor.

    One of a series of papers resulting from a Fund for the Improvement of Postsecondary Education (FIPSE) project to improve evaluation and planning in community colleges, this working paper presents a plan of purposes and activities to experimentally test a model of delineation of responsibilities among accrediting commissions, state agencies, and…

  7. Time, Money, and the Control of One's Own Work Life: An Examination of the Deferred Salary Leave Plan.

    ERIC Educational Resources Information Center

    Jacobson, Stephen L.; Kennedy, Sylvia

    1997-01-01

    Describes a contractually negotiated income/leisure substitution provision commonly used in Canada. The deferred-salary leave plan gives teachers greater control over their work lives by letting them set aside monies to underwrite future leaves of absence. The plan may help teachers alleviate job stress, offset increased demands of reform…

  8. Strategic and Unpressured Within-Task Planning and Their Associations with Working Memory

    ERIC Educational Resources Information Center

    Li, Shaofeng; Fu, Mengxia

    2018-01-01

    This study investigated the comparative effects of strategic and unpressured within-task planning on second language (L2) Chinese oral production and the role of working memory in mediating the effects of the two types of planning. Twenty-nine L2 Chinese learners at a large New Zealand university performed a narrative task after watching a…

  9. The Change of Planned Happenstance Skills and Its Association with Career-Related Variables during School-to-Work Transition

    ERIC Educational Resources Information Center

    Yang, NaYeon; Yaung, Huk; Noh, Hyunkyung; Jang, Sun Hee; Lee, Bora

    2017-01-01

    The current study examined how planned happenstance skills (i.e., curiosity, flexibility, persistence, optimism, and risk-taking) changed during school-to-work transition and how career-related variables were associated with the initial levels and change rates of planned happenstance skills. In a sample of 307 South Korean college students, all…

  10. 40 CFR 63.7294 - What work practice standard must I meet for soaking?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... prepare and operate at all times according to a written work practice plan for soaking. Each plan must... 40 Protection of Environment 14 2012-07-01 2011-07-01 true What work practice standard must I meet... (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...

  11. 40 CFR 63.7294 - What work practice standard must I meet for soaking?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... prepare and operate at all times according to a written work practice plan for soaking. Each plan must... 40 Protection of Environment 14 2014-07-01 2014-07-01 false What work practice standard must I... (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...

  12. 40 CFR 63.7294 - What work practice standard must I meet for soaking?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... prepare and operate at all times according to a written work practice plan for soaking. Each plan must... 40 Protection of Environment 13 2011-07-01 2011-07-01 false What work practice standard must I... (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...

  13. 40 CFR 63.7294 - What work practice standard must I meet for soaking?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... prepare and operate at all times according to a written work practice plan for soaking. Each plan must... 40 Protection of Environment 13 2010-07-01 2010-07-01 false What work practice standard must I... (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...

  14. TSCA Work Plan Chemical Technical Supplement – Physicochemical Properties and Environmental Fate of the Brominated Phthalates Cluster (BPC) Chemicals

    EPA Pesticide Factsheets

    TSCA Work Plan Chemical Technical Supplement – Physicochemical Properties and Environmental Fate of the Brominated Phthalates Cluster (BPC) Chemicals -- Brominated Phthalates Cluster Flame Retardants.

  15. Planning a Unit of Work: Incorporating Students' Questions.

    ERIC Educational Resources Information Center

    Hanifi, Hadiya; Donald, Kelly; Zeegers, Yvonne

    2003-01-01

    Presents a plan for a unit of work on spiders. Suggests initiating class discussion with issues of safety and environmental responsibility that are considered when dealing with the hands-on aspects of topics. (KHR)

  16. 48 CFR 333.104 - Protests to GAO.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... a stop work order has been issued.) (I) A copy of any mutual agreement to suspend work on a no-cost... determination. (N) The acquisition plan, source selection plan, and the source selection decision document. (O...

  17. 48 CFR 333.104 - Protests to GAO.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... a stop work order has been issued.) (I) A copy of any mutual agreement to suspend work on a no-cost... determination. (N) The acquisition plan, source selection plan, and the source selection decision document. (O...

  18. 23 CFR 710.203 - Funding and reimbursement.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... planning, right-of-way plan preparation, title work, and similar necessary right-of-way related work. (iii... settlements in accordance with 49 CFR 24.102(i), legal settlements, court awards, and costs incidental to the...

  19. Work plan for cone penetrometer comparison testing.

    DOT National Transportation Integrated Search

    2011-01-01

    The work plan and experimental design are developed around aiding engineers and geologists within the : Wisconsin Department of Transportation to understand the mechanisms controlling cone penetration test : results so that they can decide when the t...

  20. Maternity Leave in Taiwan

    PubMed Central

    Feng, Joyce Yen; Han, Wen-Jui

    2011-01-01

    Using the first nationally representative birth cohort study in Taiwan, this paper examines the role that maternity leave policy in Taiwan plays in the timing of mothers returning to work after giving birth, as well as the extent to which this timing is linked to the amount of time mothers spend with their children and their use of breast milk versus formula. We found that the time when mothers returned to work coincided with the duration of guaranteed leave. In particular, mothers with a labor pension plan resumed work significantly earlier than mothers with no pension plan, and mothers with no pension plan returned to work significantly later than those with pension plans. The short leave of absence guaranteed under existing policies translated into mothers spending less time with their children and being more likely to exclusively use formula by 6 months after birth. In contrast, mothers who resumed work later than 6 months after birth were more likely to have not worked before birth or to have quit their jobs during pregnancy. Implications and recommendations for parental leave policy in Taiwan are discussed. PMID:21603074

  1. Maternity Leave in Taiwan.

    PubMed

    Feng, Joyce Yen; Han, Wen-Jui

    2010-07-01

    Using the first nationally representative birth cohort study in Taiwan, this paper examines the role that maternity leave policy in Taiwan plays in the timing of mothers returning to work after giving birth, as well as the extent to which this timing is linked to the amount of time mothers spend with their children and their use of breast milk versus formula. We found that the time when mothers returned to work coincided with the duration of guaranteed leave. In particular, mothers with a labor pension plan resumed work significantly earlier than mothers with no pension plan, and mothers with no pension plan returned to work significantly later than those with pension plans. The short leave of absence guaranteed under existing policies translated into mothers spending less time with their children and being more likely to exclusively use formula by 6 months after birth. In contrast, mothers who resumed work later than 6 months after birth were more likely to have not worked before birth or to have quit their jobs during pregnancy. Implications and recommendations for parental leave policy in Taiwan are discussed.

  2. Women's attitudes towards mechanisms of action of family planning methods: survey in primary health centres in Pamplona, Spain.

    PubMed

    de Irala, Jokin; Lopez del Burgo, Cristina; Lopez de Fez, Carmen M; Arredondo, Jorge; Mikolajczyk, Rafael T; Stanford, Joseph B

    2007-06-27

    Informed consent in family planning includes knowledge of mechanism of action. Some methods of family planning occasionally work after fertilization. Knowing about postfertilization effects may be important to some women before choosing a certain family planning method. The objective of this survey is to explore women's attitudes towards postfertilization effects of family planning methods, and beliefs and characteristics possibly associated with those attitudes. Cross-sectional survey in a sample of 755 potentially fertile women, aged 18-49, from Primary Care Health Centres in Pamplona, Spain. Participants were given a 30-item, self-administered, anonymous questionnaire about family planning methods and medical and surgical abortion. Logistic regression was used to identify variables associated with women's attitudes towards postfertilization effects. The response rate was 80%. The majority of women were married, held an academic degree and had no children. Forty percent of women would not consider using a method that may work after fertilization but before implantation and 57% would not consider using one that may work after implantation. While 35.3% of the sample would stop using a method if they learned that it sometimes works after fertilization, this percentage increased to 56.3% when referring to a method that sometimes works after implantation. Women who believe that human life begins at fertilization and those who consider it is important to distinguish between natural and induced embryo loss were less likely to consider the use of a method with postfertilization effects. Information about potential postfertilization effects of family planning methods may influence women's acceptance and choice of a particular family planning method. Additional studies in other populations are necessary to evaluate whether these beliefs are important to those populations.

  3. Developing models of how cognitive improvements change functioning: Mediation, moderation and moderated mediation

    PubMed Central

    Wykes, Til; Reeder, Clare; Huddy, Vyv; Taylor, Rumina; Wood, Helen; Ghirasim, Natalia; Kontis, Dimitrios; Landau, Sabine

    2012-01-01

    Background Cognitive remediation (CRT) affects functioning but the extent and type of cognitive improvements necessary are unknown. Aim To develop and test models of how cognitive improvement transfers to work behaviour using the data from a current service. Method Participants (N49) with a support worker and a paid or voluntary job were offered CRT in a Phase 2 single group design with three assessments: baseline, post therapy and follow-up. Working memory, cognitive flexibility, planning and work outcomes were assessed. Results Three models were tested (mediation — cognitive improvements drive functioning improvement; moderation — post treatment cognitive level affects the impact of CRT on functioning; moderated mediation — cognition drives functioning improvements only after a certain level is achieved). There was evidence of mediation (planning improvement associated with improved work quality). There was no evidence that cognitive flexibility (total Wisconsin Card Sorting Test errors) and working memory (Wechsler Adult Intelligence Scale III digit span) mediated work functioning despite significant effects. There was some evidence of moderated mediation for planning improvement if participants had poorer memory and/or made fewer WCST errors. The total CRT effect on work quality was d = 0.55, but the indirect (planning-mediated CRT effect) was d = 0.082 Conclusion Planning improvements led to better work quality but only accounted for a small proportion of the total effect on work outcome. Other specific and non-specific effects of CRT and the work programme are likely to account for some of the remaining effect. This is the first time complex models have been tested and future Phase 3 studies need to further test mediation and moderated mediation models. PMID:22503640

  4. Improving productivity levels: family planning services for factory workers.

    PubMed

    Darmokusumo, H V

    1989-10-01

    In May 1984, the Minister of Manpower in Indonesia, the Chairman of the BKKBN, and representatives of the employers' and workers' organizations of Indonesia issued a joint decree pledging that they would work together to enhance the implementation of the family planning program among workers in the organized sector. 1 objective of the decree is to improve workers' productivity and the standard of living of workers and their families by implementing a family planning program. 1 baseline survey and a clinic-based survey in 5 provinces revealed that 90% of women workers are between 21-40, or are of reproductive age, and are sexually active. Only about 50% are practicing family planning; the other 50% are afraid to practice family planning due to potential side effects of various methods. This fear was most often caused by negative rumors spread by unsatisfied family planning clients. Placing materials for family planning promotion such as instructional posters and video programs advertising contraceptive services in the work setting may increase knowledge and help alleviate some of this fear. Other studies of family planning services show that employees prefer female medical doctors or midwives as service providers, employees are willing to pay for services (but can only afford a small fee), and family planning service points should be near employees' work sites.

  5. Career destinations, views and future plans of the UK medical qualifiers of 1988.

    PubMed

    Taylor, Kathryn; Lambert, Trevor; Goldacre, Michael

    2010-01-01

    To report the career destinations, views and future plans of a cohort of senior doctors who qualified in the 1980s. Postal questionnaire survey of all doctors who qualified from all UK medical schools in 1988. The response rate was 69%. We estimated that 81% of the total cohort was working in the NHS, 16 years after qualification; and that at least 94% of graduates who, when students, were from UK homes, were working in medicine. Of NHS doctors, 30% worked part-time. NHS doctors rated their job satisfaction highly (median score 19.9, scale 5-25) but were less satisfied with the amount of leisure time available to them (median score 5.4, scale 1-10). NHS doctors were very positive about their careers, but were less positive about working hours and some other aspects of the NHS. Women were more positive than men about working conditions; general practitioners were more positive than hospital doctors. Twenty-five percent reported unmet needs for further training or career-related advice, particularly about career development. Twenty-nine percent intended to reduce their hours in future, while 6%, mainly part-time women, planned to increase their hours. Overall, 10% of NHS doctors planned to do more service work in future and 24% planned to do less; among part-time women, 18% planned to do more and only 14% less. These NHS doctors, now in their 40s, had a high level of satisfaction with their jobs and their careers but were less satisfied with some other aspects of their working environment. A substantial percentage had expectations about future career development and change.

  6. Career destinations, views and future plans of the UK medical qualifiers of 1988

    PubMed Central

    Taylor, Kathryn; Lambert, Trevor; Goldacre, Michael

    2010-01-01

    Summary Objectives To report the career destinations, views and future plans of a cohort of senior doctors who qualified in the 1980s. Methods Postal questionnaire survey of all doctors who qualified from all UK medical schools in 1988. Results The response rate was 69%. We estimated that 81% of the total cohort was working in the NHS, 16 years after qualification; and that at least 94% of graduates who, when students, were from UK homes, were working in medicine. Of NHS doctors, 30% worked part-time. NHS doctors rated their job satisfaction highly (median score 19.9, scale 5–25) but were less satisfied with the amount of leisure time available to them (median score 5.4, scale 1–10). NHS doctors were very positive about their careers, but were less positive about working hours and some other aspects of the NHS. Women were more positive than men about working conditions; general practitioners were more positive than hospital doctors. Twenty-five percent reported unmet needs for further training or career-related advice, particularly about career development. Twenty-nine percent intended to reduce their hours in future, while 6%, mainly part-time women, planned to increase their hours. Overall, 10% of NHS doctors planned to do more service work in future and 24% planned to do less; among part-time women, 18% planned to do more and only 14% less. Conclusions These NHS doctors, now in their 40s, had a high level of satisfaction with their jobs and their careers but were less satisfied with some other aspects of their working environment. A substantial percentage had expectations about future career development and change. PMID:20056666

  7. Predicting change over time in career planning and career exploration for high school students.

    PubMed

    Creed, Peter A; Patton, Wendy; Prideaux, Lee-Ann

    2007-06-01

    This study assessed 166 high school students in Grade 8 and again in Grade 10. Four models were tested: (a) whether the T1 predictor variables (career knowledge, indecision, decision-making self efficacy, self-esteem, demographics) predicted the outcome variable (career planning/exploration) at T1; (b) whether the T1 predictor variables predicted the outcome variable at T2; (c) whether the T1 predictor variables predicted change in the outcome variable from T1-T2; and (d) whether changes in the predictor variables from T1-T2 predicted change in the outcome variable from T1-T2. Strong associations (R(2)=34%) were identified for the T1 analysis (confidence, ability and paid work experience were positively associated with career planning/exploration). T1 variables were less useful predictors of career planning/exploration at T2 (R(2)=9%; having more confidence at T1 was associated with more career planning/exploration at T2) and change in career planning/exploration from T1-T2 (R(2)=11%; less confidence and no work experience were associated with change in career planning/exploration from T1-T2). When testing effect of changes in predictor variables predicting changes in outcome variable (R(2)=22%), three important predictors, indecision, work experience and confidence, were identified. Overall, results indicated important roles for self-efficacy and early work experiences in current and future career planning/exploration of high school students.

  8. Interim OECA Guidance on Enhancing Regional-State Planning and Communication on Compliance Assurance Work in Authorized States

    EPA Pesticide Factsheets

    Guidance outlining principles and best practices for State and EPA collaboration in inspections and enforcement. work planning and implementation. National Enforcement Initiatives, and outcome and performance measurement.

  9. Responses to Comments for N-Methylpyrrolidone (NMP) Work Plan Risk Assessment

    EPA Pesticide Factsheets

    This document summarizes the public and external peer review comments that the EPA’s Office of Pollution Prevention and Toxics (OPPT) received for the draft work plan risk assessment for n-Methylpyrrolidone (NMP).

  10. The interplay between women's life course work patterns and financial planning for later life.

    PubMed

    Berger, Ellie D; Denton, Margaret A

    2004-01-01

    In order to gain a comprehensive understanding of the interplay between women's life course work patterns and their financial planning for later life, we examined data from semi-structured interviews with retired women (n = 28) aged 59 to 92. The majority of women disrupted their careers at some point in time, for an average of 14 years, primarily for child-rearing responsibilities. We found that financial preparedness and income security in later life are structured by women's life course work patterns. However, individuals also have the ability to shape their own lives and many of the women took the initiative to acquire financial knowledge irrespective of their work situation. Financial-planning advice that participants gave to future generations of older women was also explored and centred on the importance of saving, avoiding debt, maintaining financial independence, and planning ahead.

  11. The importance of work or productive activity in life care planning and case management

    PubMed Central

    Reid, Christine; Riddick-Grisham, Susan

    2015-01-01

    Abstract INTRODUCTION: The importance of work or productive activity for the well-being, community integration, and quality of life of people living with disabilities is addressed, with implications for life care planning and case management. BACKGROUND: The role of work or productive activity in our society, and consequences of deprivation if rehabilitation services do not address vocational effects of disabilities, is explored. A continuum of productivity options is introduced; types of vocational rehabilitation assessment processes and interventions are described. PURPOSE: The role of vocational rehabilitation services in life care planning and case management is discussed, focusing on quality of life for people living with disabilities. CONCLUSION: Rehabilitation and health care professionals should understand the importance of work or other productive activity, and support the development of appropriate plans to address those needs among people who have disabilities. PMID:26409330

  12. Planning Skills and Negotiator Goal Accomplishment: The Relationship between Self-Monitoring and Plan Generation, Plan Enactment, and Plan Consequences.

    ERIC Educational Resources Information Center

    Jordan, Jerry Monroe; Roloff, Michael E.

    1997-01-01

    Focuses on skills necessary for effective negotiation planning. Argues that the information processing tendencies of high self-monitors make them adept at negotiation planning. Extends existing work by relating self-monitoring to plan generation, enactment, and consequences. Indicates that self-monitoring is related to prenegotiation goal…

  13. Bay Delta Conservation Plan / California WaterFix Documents

    EPA Pesticide Factsheets

    EPA is working with state and federal agencies on development of the Bay Delta Conservation Plan (BDCP), a habitat conservation plan. This page contains correspondence commenting on BDCP planning by state and federal agencies.

  14. Planning and Accreditation: A Survey of Attitudes of Policymakers. Improving Community College Evaluation and Planning: Project Working Papers Numbers Five, Six, and Seven.

    ERIC Educational Resources Information Center

    California Community Colleges, Sacramento. Office of the Chancellor.

    One of a series of papers resulting from a Fund for the Improvement of Postsecondary Education (FIPSE) project to improve evaluation and planning in community colleges, this working paper presents the results of interviews with community college policymakers conducted to assess their views on matters such as non-governmental accreditation,…

  15. Occupational Training Plans for Disadvantaged and Handicapped Students in Vocational Education. A Manual for Use in Cooperative Work Experience Programs.

    ERIC Educational Resources Information Center

    Eley, Robert K., Ed.

    This manual, developed to provide vocational instructors or coordinators with model training plans to be used to conduct concurrent work and education programs for disadvantaged and handicapped students, has the purposes of: (1) serving as a description of the kinds of content that should be included in a training plan, (2) serving as an example…

  16. The Industrial Perspective

    DTIC Science & Technology

    1989-09-01

    projections of planned construction, overhaul and repair work from both the public and commercial sectors can never sustain the industry at a level which...and other government organizations to support the Shipyard Recovery Plan and the revitalization of commercial shipbuilding in America. Expanding...engineer sitting next to the organization that does work package planning on ships and from the fleet. It won’t be, at least in these competitive firms

  17. U.S. Navy Advanced Receiving: A Better Approach to the Basics.

    DTIC Science & Technology

    1987-04-01

    the Navy and DLA should begin now to plan for electronic interchange of data between their inventory management systems. This would eliminate the...labor savings from work simplification, improved material handling, and better work load planning 0 Material savings from reduced packaging and use of... planning purposes, source distribution managers use the following equa- tion to determine maximum consolidation time: Maximum consolidation time = 21

  18. Using Global Climate Data to Inform Long-Term Water Planning Decisions

    NASA Astrophysics Data System (ADS)

    Groves, D. G.; Lempert, R.

    2008-12-01

    Water managers throughout the world are working to consider climate change in their long-term water planning processes. The best available information regarding plausible future hydrologic conditions are largely derived from global circulation models and from paleoclimate data. To date there lacks a single approach for (1) utilizing these data in water management planning tools for analysis and (2) evaluating the myriad of possible adaptation options. This talk will describe several approaches being used at RAND to incorporate global projections of climate change into local, regional, and state-wide long-term water planning. It will draw on current work with the California Department of Water Resources and other local Western water agencies, and a recently completed project with the Inland Empire Utilities Agency. Work to date suggests that climate information can be assimilated into local water planning tools to help identify robust climate adaptation water management strategies.

  19. 45 CFR 261.61 - How must a State document a work-eligible individual's hours of participation?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... individual who is self-employed, the documentation must comport with standards set forth in the State's approved Work Verification Plan. Self-reporting by a participant without additional verification is not... case file. In accordance with § 261.62, a State must describe in its Work Verification Plan the...

  20. Work Planning and Control - Activity-Based Work Authorization

    Science.gov Websites

    Good Activity Description Training & Resources WPC Feedback or Help Request DOE and UC Seals DOE UC Home Training FAQ Contact Home Welcome! The purpose of this site is to keep everyone at LBNL connected in the(Training section). Work Planning and Control (WPC) is a program focused on implementing

  1. 20 CFR 411.715 - If an alternate participant becomes an EN, will beneficiaries for whom an employment plan was...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., will beneficiaries for whom an employment plan was signed prior to implementation be covered under the Ticket to Work program payment provisions? 411.715 Section 411.715 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE TICKET TO WORK AND SELF-SUFFICIENCY PROGRAM The Ticket to Work Program and Alternate...

  2. 20 CFR 411.730 - What happens if an alternate participant signed an employment plan with a beneficiary before...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... signed an employment plan with a beneficiary before Ticket to Work program implementation in the State... Section 411.730 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE TICKET TO WORK AND SELF-SUFFICIENCY PROGRAM The Ticket to Work Program and Alternate Participants Under the Programs For Payments For...

  3. 78 FR 51749 - Proposed Information Collection; Ventilation Plan and Main Fan Maintenance Record (Pertains to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-21

    ... maintaining a safe and healthful working environment. A well planned mine ventilation system is necessary to assure a fresh air supply to miners at all working places, to control the amounts of harmful airborne... usually present harsh and hostile working environments. The ventilation system is the most vital life...

  4. A Standard Training Plan for Distributive Education Cooperative Work Programs. (Revised Spring, 1976).

    ERIC Educational Resources Information Center

    Robinson, James B.; Hanjis, Anthony J.

    Prepared to assist the distributive education work coordinator in using the Standard Training Plan (STP) for the cooperative program work assignments of students, this manual describes the development of the STP, provides instructions for its use, and discusses some specific problem areas. The author takes the approach that what is needed is a…

  5. Contingency plan implementation.

    PubMed

    Neurath, D; Cober, N; Owens, W; Giulivi, A

    2012-06-01

    Although the National blood system in Canada reduces the risk of inventory shortages the possibility of a blood supply shortage still exists. The Ontario Ministry of Health and Long-Term Care developed a provincial plan to manage blood transfusion needs and inventory in the event of a National blood shortage. The Ontario plan was developed to align with the National plan as well as other provincial plans in order to ensure consistency in blood management strategies across the country. The Ontario plan was released in 2008, along with a toolkit to aid hospitals in developing their facility specific plans. In the Champlain region of Ontario, a group of 16 hospitals worked collaboratively to develop a regional blood shortage plan. A provincial blood shortage simulation exercise was held in 2010 to test out these plans. The Director of Transfusion Medicine of the largest facility in the group of 16 hospitals (The Ottawa Hospital) took the lead in the development of the regional blood shortage management plan. Working groups from all 16 sites contributed to the plan development. The proposed plan was presented to the Medical Advisory Committee for approval. The plan consists of activities relating to the severity of the supply shortage as defined by Amber, Red, Recovery and Green phases. The plan includes a communication plan for notifying stakeholders including patients whose treatment may be affected. Inventory management and triage guidelines are provided to reduce the demand for blood and to conserve inventory for those patients whose need is prioritized as highest. The regional blood shortage management plan was tested successfully during the provincial simulation exercise. Where regional hospitals work together to provide healthcare, it is beneficial to develop a standardized plan to provide guidance to hospital personnel in response to a blood supply shortage. A consistent plan will ensure patient care is provided in a consistent manner across a health region. Mock or simulation exercises can aid in testing plans and raising the awareness of stakeholders. Copyright © 2012 Elsevier Ltd. All rights reserved.

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, L. M.; Environmental Science Division

    This Work Plan outlines the scope of work to be conducted to investigate the subsurface contaminant conditions at the property formerly leased by the Commodity Credit Corporation (CCC) in Powhattan, Kansas (Figure 1.1). Data obtained during this event will be used to (1) evaluate potential contaminant source areas on the property; (2) determine the vertical and horizontal extent of potential contamination; and (3) provide recommendations for future action, with the ultimate goal of assigning this site No Further Action status. The planned investigation includes groundwater monitoring requested by the Kansas Department of Health and Environment (KDHE), in accordance with Sectionmore » V of the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the U.S. Department of Agriculture (USDA). The work is being performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. A nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy, Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at former CCC/USDA grain storage facilities. Argonne issued a Master Work Plan (Argonne 2002) that has been approved by the KDHE. The Master Work Plan describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. It should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Powhattan.« less

  7. [Women in informal economy health and work conditions Bogotá. 2007].

    PubMed

    Sotelo-Suárez, Nidia R; Quiroz-Arcentáles, Jorge L; Mahecha-Montilla, Charo P; López-Sánchez, Paola A

    2012-06-01

    To determine work and health conditions of women working in informal economy in Bogotá, as well as to recommend priority action plans for preventing illnesses and accidents related to work and their consequences. Descriptive observational study. This study analyzed information collected by local groups in work-related contexts during 2007 as part of a set of forms of intervention established according to the Plan de Atención Básica (Primary Care Plan). This plan included 3 715 units of informal work from every point of the city. 3 936 women registers in all were analyzed. This study reveals evident precariousness conditions of women in this economic sector. Specifically, there are certain evident conditions that had shown in this study such as low education levels, incomes below the minimum legal standards, high exposure to damaging health work conditions, long work hours, and few hours for leisure and free time. Furthermore, 75 % of women included in this study are female head of household. This condition makes them more vulnerable to a heavier family and social burden. Closer attention to informal economy phenomenon is suggested in order to avoid vulnerable conditions of working women. Besides, it is necessary to improve the articulation between Academy and forms of intervention through public policies for knowing deeply repeated phenomena regarding the population of study. This articulation can be thought for implementing programs designed for improving women's quality of life.

  8. When planning results in loss of control: intention-based reflexivity and working-memory

    PubMed Central

    Meiran, Nachshon; Cole, Michael W.; Braver, Todd S.

    2012-01-01

    In this review, the authors discuss the seemingly paradoxical loss of control associated with states of high readiness to execute a plan, termed “intention-based reflexivity.” The review suggests that the neuro-cognitive systems involved in the preparation of novel plans are different than those involved in preparation of practiced plans (i.e., those that have been executed beforehand). When the plans are practiced, intention-based reflexivity depends on the prior availability of response codes in long-term memory (LTM). When the plans are novel, reflexivity is observed when the plan is pending and the goal has not yet been achieved. Intention-based reflexivity also depends on the availability of working-memory (WM) limited resources and the motivation to prepare. Reflexivity is probably related to the fact that, unlike reactive control (once a plan is prepared), proactive control tends to be relatively rigid. PMID:22586382

  9. Civil Engineering Work Information Management System (WIMS) Planning Guide,

    DTIC Science & Technology

    1985-04-01

    WORK INFORMATION MANAGEMENT SYSTEM PLANNING GUIDE l-!O L~ JAUG 0)12 13 "’ ’’’ " " 𔄂 5 7 2 2 0 0 9 W WTVF--- DISCLAIMER The views and conclusions...y CHAPTER PAGE I INTRODUCTION What is WIMS? --------------------------------- 1I Why Do We Need A WIMS Planning Guide? ------------ I The Target...Administrator ------------------ 21 6 EQUIPMENT AND SUPPLIES Introduction ------------------------------- 22 Magnetic Media Supplies

  10. Issues in Adaptive Planning

    DTIC Science & Technology

    1986-06-30

    approach to the application of theorem proving to problem solving, Aritificial Intelligence 2 (1Q71), 18Q- 208. 4. Fikes, R., Hart, P. and Nilsson, N...by emphasizing the structure of knowledge. 1.2. Planning Literature The earliest work in planning in Artificial Intelligence grew out of the work on...References 1. Newell, A., Artificial Intelligence and the concept of mind, in Computer models of thought and language, Schank, R. and Colby, K. (editor

  11. Motion Planning of Two Stacker Cranes in a Large-Scale Automated Storage/Retrieval System

    NASA Astrophysics Data System (ADS)

    Kung, Yiheng; Kobayashi, Yoshimasa; Higashi, Toshimitsu; Ota, Jun

    We propose a method for reducing the computational time of motion planning for stacker cranes. Most automated storage/retrieval systems (AS/RSs) are only equipped with one stacker crane. However, this is logistically challenging, and greater work efficiency in warehouses, such as those using two stacker cranes, is required. In this paper, a warehouse with two stacker cranes working simultaneously is proposed. Unlike warehouses with only one crane, trajectory planning in those with two cranes is very difficult. Since there are two cranes working together, a proper trajectory must be considered to avoid collision. However, verifying collisions is complicated and requires a considerable amount of computational time. As transport work in AS/RSs occurs randomly, motion planning cannot be conducted in advance. Planning an appropriate trajectory within a restricted duration would be a difficult task. We thereby address the current problem of motion planning requiring extensive calculation time. As a solution, we propose a “free-step” to simplify the procedure of collision verification and reduce the computational time. On the other hand, we proposed a method to reschedule the order of collision verification in order to find an appropriate trajectory in less time. By the proposed method, we reduce the calculation time to less than 1/300 of that achieved in former research.

  12. Groundwater Interim Measures Work Plan for the Former Chemical Plant

    EPA Pesticide Factsheets

    May 2012 Groundwater IMWP, revised per EPA's approval, focuses on the installation of a groundwater containment system to mitigate groundwater migration from the former plant. A prior 2002 work plan is included in its entirety in Appendix B.

  13. 7 CFR 1924.101 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE... CONSTRUCTION AND REPAIR Planning and Performing Site Development Work § 1924.101 Purpose. This subpart establishes the basic Rural Housing Service (RHS) policies for planning and performing site development work...

  14. Corridor Planning And Feasibility Analysis Corridor, Master Plan

    DOT National Transportation Integrated Search

    1996-04-01

    THE I-70 RURAL IVHS CORRIDOR MASTER PLAN IS THE GUIDANCE DOCUMENT FOR DEPLOYMENT OF THE INTELLIGENT TRANSPORTATION SYSTEM (ITS) FOR THE INTERSTATE-70 CORRIDOR FROM DENVER TO GLENWOOD SPRINGS, COLORADO. AS A WORKING DOCUMENT, THE PLAN RECOMMENDS STRAT...

  15. Employees' Intentions to Retire Early: A Case of Planned Behavior and Anticipated Work Conditions

    ERIC Educational Resources Information Center

    van Dam, Karen; van der Vorst, Janine D. M.; van der Heijden, Beatrice I. J. M.

    2009-01-01

    This study investigated the early retirement intentions of 346 older Dutch employees by extending the theory of planned behavior with anticipated work conditions. The results showed that employees who felt a pressure from their spouse to retire early had a strong intention to leave the work force before the official retirement age, that is 65.…

  16. 45 CFR 261.60 - What hours of participation may a State report for a work-eligible individual?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... days that it wishes to count as holidays for those in unpaid activities in its Work Verification Plan... policies and definitions as part of its Work Verification Plan, specified at § 261.62. (c) For unsubsidized... toward the participation rate for a self-employed individual than the number derived by dividing the...

  17. Contribution of Reactive and Proactive Control to Children's Working Memory Performance: Insight from Item Recall Durations in Response Sequence Planning

    ERIC Educational Resources Information Center

    Chevalier, Nicolas; James, Tiffany D.; Wiebe, Sandra A.; Nelson, Jennifer Mize; Espy, Kimberly Andrews

    2014-01-01

    The present study addressed whether developmental improvement in working memory span task performance relies upon a growing ability to proactively plan response sequences during childhood. Two hundred thirteen children completed a working memory span task in which they used a touchscreen to reproduce orally presented sequences of animal names.…

  18. Working beyond 65: predictors of late retirement for women and men MBAs.

    PubMed

    Frieze, Irene Hanson; Olson, Josephine E; Murrell, Audrey J

    2011-01-01

    Comparisons of those who planned to continue working after the age of 65 with those who did not were made for 145 women and 414 men working in managerial fields. All received MBA degrees between the years of 1973 and 1982. About 20% definitely wanted to work after age 65. More positive views of work were predictive of wanting to continue working as was having nontraditional gender-role attitudes. Men who planned to continue working were particularly likely to have a spouse wanting to work past the age of 65. Several other factors appeared to operate differently for women and men.

  19. Planning for Impact: A Guide to Planning Effective Family Program.

    ERIC Educational Resources Information Center

    Hardy, James M.

    A document intended to provide program planning guidelines for Young Men's Christian Associations (YMCAs) desirous of working with families, recommends adherence to eight principles and following of five steps. The principles involve planning before action, fact finding and analysis, clear delineation of operational objectives, planning at all…

  20. WAG 2 remedial investigation and site investigation site-specific work plan/health and safety checklist for the soil and sediment task. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Holt, V.L.; Burgoa, B.B.

    1993-12-01

    This document is a site-specific work plan/health and safety checklist (WP/HSC) for a task of the Waste Area Grouping 2 Remedial Investigation and Site Investigation (WAG 2 RI&SI). Title 29 CFR Part 1910.120 requires that a health and safety program plan that includes site- and task-specific information be completed to ensure conformance with health- and safety-related requirements. To meet this requirement, the health and safety program plan for each WAG 2 RI&SI field task must include (1) the general health and safety program plan for all WAG 2 RI&SI field activities and (2) a WP/HSC for that particular field task.more » These two components, along with all applicable referenced procedures, must be kept together at the work site and distributed to field personnel as required. The general health and safety program plan is the Health and Safety Plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee (ORNL/ER-169). The WP/HSCs are being issued as supplements to ORNL/ER-169.« less

  1. How can the rehabilitation planning process at the workplace be improved? A qualitative study from employers' perspective.

    PubMed

    Larsson, Agneta; Gard, Gunvor

    2003-09-01

    Employers in Sweden are by law responsible for planning and controlling the working environment situation in their companies and for ensuring that any need for rehabilitation is noted as soon as possible and that action is taken. This includes developing a plan for rehabilitation. The aim of this study is to describe employers' experiences of the work rehabilitation planning process at the workplace, and how it can be improved with a focus on quality and cost-effectiveness. Qualitative interviews were performed with 10 employers of employee/s that had participated in vocational rehabilitation at a rehabilitation center in the North of Sweden. The results showed that employers were interested in detecting work rehabilitation needs and in taking action early. Rehabilitation at the workplace could be improved by development of routines, improved work relations and work technique, and environment in-service training at the workplace. Prevention was perceived as a prerequisite for a good result of rehabilitation. Attention to social and geographic conditions is needed. Organizational and financial limitations exist.

  2. Progress in Decommissioning the Humboldt Bay Power Plant - 13604

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rod, Kerry; Shelanskey, Steven K.; Kristofzski, John

    Decommissioning of the Pacific Gas and Electric (PG and E) Company Humboldt Bay Power Plant (HBPP) Unit 3 nuclear facility has now, after more than three decades of SAFSTOR and initial decommissioning work, transitioned to full-scale decommissioning. Decommissioning activities to date have been well orchestrated and executed in spite of an extremely small work site with space constricted even more by other concurrent on-site major construction projects including the demolition of four fossil units, construction of a new generating station and 60 KV switchyard upgrade. Full-scale decommissioning activities - now transitioning from Plant Systems Removal (PG and E self-perform) tomore » Civil Works Projects (contractor performed) - are proceeding in a safe, timely, and cost effective manner. As a result of the successful decommissioning work to date (approximately fifty percent completed) and the intense planning and preparations for the remaining work, there is a high level of confidence for completion of all HBPP Unit 3 decommissions activities in 2018. Strategic planning and preparations to transition into full-scale decommissioning was carried out in 2008 by a small, highly focused project team. This planning was conducted concurrent with other critical planning requirements such as the loading of spent nuclear fuel into dry storage at the Independent Spent Fuel Storage Installation (ISFSI) finishing December 2008. Over the past four years, 2009 through 2012, the majority of decommissioning work has been installation of site infrastructure and removal of systems and components, known as the Plant System Removal Phase, where work scope was dynamic with significant uncertainty, and it was self-performed by PG and E. As HBPP Decommissioning transitions from the Plant System Removal Phase to the Civil Works Projects Phase, where work scope is well defined, a contracting plan similar to that used for Fossil Decommissioning will be implemented. Award of five major work scopes in various stages of development are planned as they include: Turbine Building Demolition, Nuclear Facilities Demolition and Excavation, Intake and Discharge Canal Remediation, Office Facility Demobilization, and Final Site Restoration. Benefits realized by transitioning to the Civil Works Projects Phase with predominant firm fixed-price/fixed unit price contracting include single civil works contractor who can coordinate concrete shaving, liner removal, structural removal, and other demolition activities; streamline financial control; reduce PG and E overhead staffing; and provide a specialized Bidder Team with experience from other similar projects. (authors)« less

  3. 7 CFR 1753.94 - Procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... accept the certification only for matters within the staff engineer's area of specialization. In such... certification coordinator. (b) Certification borrowers, shall submit and obtain RUS approval of a work plan before construction and related engineering begin. (1) The work plan shall provide a description of the...

  4. 40 CFR 35.668 - Award limitation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ASSISTANCE Environmental Program Grants for Tribes Pollution Prevention Grants (section 6605) § 35.668 Award limitation. If the Pollution Prevention Grant funds are included in a Performance Partnership Grant, the Pollution Prevention work plan commitments must be included in the Performance Partnership Grant work plan. ...

  5. TSCA Work Plan: 2012 Scoring of Potential Candidate Chemicals Entering Step 2

    EPA Pesticide Factsheets

    In 2012, EPA scored these chemicals based on hazard, exposure and persistence/bioaccumulation criteria as part of Step 2 in the Work Plan methodology in order to identify candidate chemicals for near-term review and assessment under TSCA.

  6. Draft Site Management and Monitoring Plan for Corpus Christi Maintenance and New Work Ocean Dredged Material Disposal Site

    EPA Pesticide Factsheets

    USEPA Region 6 and the US Army Corps of Engineers submit for public comment the Draft Site Management and Monitoring Plan for Corpus Christi Maintenance and New Work Ocean Dredged Material Disposal Site

  7. Using historical crash data as part of traffic work zone safety planning and project management strategies.

    DOT National Transportation Integrated Search

    2014-07-01

    This funding enabled the project entitled, USING HISTORICAL CRASH DATA AS PART OF TRAFFIC WORK ZONE SAFETY : PLANNING AND PROJECT MANAGEMENT STRATEGIES to address the following: : Evaluate current organizational strategies with respect to w...

  8. 77 FR 64998 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-24

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Administration for Children and Families Submission for OMB Review; Comment Request Title: Native Employment Works (NEW) Program Plan Guidance and Report Requirements. OMB No.: 0970-0174. Description: The Native Employment Works (NEW) program plan is the...

  9. The working patterns and retirement plans of general dental practitioners in a Midlands Health Authority.

    PubMed

    Morris, John; Harrison, Rachel; Caswell, Martin; Lunn, Howard

    2002-10-01

    With the problems of access to NHS primary dental care services in the last few years attention has focused on manpower considerations for dentistry. This paper presents the results of a simple survey of general dental practitioners in South Staffordshire. The response rate was 88%. Most dentists (76%) reported working over 30 hours a week. A small number reported working more than 50 hours a week. Woman dentists were more likely to report working fewer than 31 hours a week. Younger male dentists tended to work longer hours than older male dentists, whereas younger women dentists tended to work fewer hours than older women. The reported retirement plans suggested that around 16% of dentists in their 40s and 50s were planning to retire before 60. The findings add weight to the view that woman dentists tend to work fewer hours but studies of cohorts are required to examine the impact of premature retirement and the reasons behind this apparent gender difference.

  10. Practice Plans of Today's Medical Students.

    ERIC Educational Resources Information Center

    Rosen, Raye Hudson; And Others

    1981-01-01

    Students' future practice plans were surveyed by questionnaire at three Michigan medical schools to study future physician productivity and its implications for health manpower planning. Results suggested that the students planned to work less than they thought their role models did. (LB)

  11. Laredo District Coahuila/Nuevo Leon/Tamaulipas border master plan : executive summary.

    DOT National Transportation Integrated Search

    2012-06-01

    Border Master Plans, as defined and supported by the U.S./Mexico Joint Working : Committee on Transportation Planning and Programming, the Federal Highway Administration, : and the U.S. Department of State, are comprehensive long range plans to inven...

  12. Planning for Adaptation to Climate Change in the City of Chicago

    NASA Astrophysics Data System (ADS)

    Wuebbles, D. J.; Hayhoe, K.; Coffee, J.; McGraw, J.; Parzen, J.

    2008-12-01

    Under Mayor Richard M. Daley's leadership, the City of Chicago initiated the Chicago Climate Action Plan (CCAP) to better understand local implications of global climate change in both higher and lower emissions scenarios, reduce greenhouse gas emissions, and implement programs to build future climate change resilience. The City approached this work not only as a way to make Chicago more adaptable in the future, but also to improve Chicago's quality of life today. The Chicago Climate Action Plan adopted stresses the importance of both reducing greenhouse gas emissions in Chicago and preparing for climate changes that may be unavoidable. Building off of the City's significant environmental programs and projects, and based on our analyses of the climate effects and impacts that improved the scientific understanding of future climate change impacts on Chicago, the City then developed a set of climate change adaptation strategies, resulting in the City of Chicago Climate Change Adaptation Summary. This document includes prioritization of climate change adaptations based on relative risk as well as framework strategies for those tactics categorized as "must do/early action." In early 2008, The Mayor's Office asked five Commissioners from its Green Steering Committee to chair adaptation work groups including: extreme heat; extreme precipitation; buildings, infrastructure and equipment; ecosystems; and leadership, planning and communications. Working with staff from relevant departments, sister agencies and other stakeholders, these work groups developed 39 basic adaptation work plans, including plans for enhancing the City's existing projects and programs that relate to climate change adaptation. Climate change adaptation work will be on-going in City Departments under the Mayor's Office leadership. The City intends to continually monitor and improve its response to climate change, resulting in an improved quality of life for Chicago residents.

  13. Should I stay or should I go? The influence of individual and organizational factors on pharmacists' future work plans.

    PubMed

    Gaither, Caroline A; Nadkarni, Anagha; Mott, David A; Schommer, Jon C; Doucette, William R; Kreling, David H; Pedersen, Craig A

    2007-01-01

    To examine the association between individual (demographic) and organizational (work environment and workload) factors and pharmacists' future work plans and explore reasons for either leaving or staying with current employers (culture/climate factors). Cross-sectional study. United States in 2004. 1,263 pharmacists. Seven-page mail survey. Future work plans, time spent in practice activities, staffing levels, and actual and perceived workload and demographic variables. Overall, 15% of respondents reported that they planned to leave their current employer within the year subsequent to this survey. More than 50% reported that their workload had significantly increased in the previous year. Multivariate analyses showed that nonwhites were 2.1 times more likely to be planning to leave their current employer, compared with whites, and unmarried respondents were 1.7 times more likely to leave than were married individuals. More negative perceptions regarding the impact of workload on various personal, work, and patient care outcomes predicted leaving. A main factor that prompted their inclinations was described by 72% of leavers (insufficient and/or unqualified staff) and 49% of stayers (flexible scheduling). The most common reasons for staying were good salary and relationships with coworkers, while the most common reasons for leaving were a desire for change and stress/workload issues. Future work plans of pharmacists are influenced by a variety of individual, organizational, and culture/climate factors. While employers have little latitude for influencing demographic characteristics of employees, many organizational and culture/climate factors (scheduling, opportunities for interpersonal interactions, salary/benefits, staffing, and workload) can be addressed with the intent of reducing pharmacist turnover.

  14. 7 CFR 1924.105 - Planning/performing development.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... for a specific site. Planning must take into consideration topography, soils, climate, adjacent land... changing demands. All planning and performing development work is the responsibility of the applicant or...

  15. 7 CFR 1924.105 - Planning/performing development.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... for a specific site. Planning must take into consideration topography, soils, climate, adjacent land... changing demands. All planning and performing development work is the responsibility of the applicant or...

  16. 7 CFR 1924.105 - Planning/performing development.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... for a specific site. Planning must take into consideration topography, soils, climate, adjacent land... changing demands. All planning and performing development work is the responsibility of the applicant or...

  17. 7 CFR 1924.105 - Planning/performing development.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... for a specific site. Planning must take into consideration topography, soils, climate, adjacent land... changing demands. All planning and performing development work is the responsibility of the applicant or...

  18. Work Plan of APEID for the Fifth Programming Cycle, 1992-1996. A Report of the APEID Programme Development Meeting (Chiang Mai, Thailand, August 28-31, 1990).

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific, and Cultural Organization, Bangkok (Thailand). Regional Office for Education in Asia and the Pacific.

    This document is a work plan for the UNESCO Asia and the Pacific Programme of Educational Innovation for Development (APEID) for the period 1992 through 1996. The plan provides a general framework for APEID, including a formulation of annual schedules of activities with due regard to available resources and funding. The document discusses three…

  19. Channel-shoal morphodynamics in response to distinct hydrodynamic drivers at the outer Weser estuary

    NASA Astrophysics Data System (ADS)

    Herrling, Gerald; Benninghoff, Markus; Zorndt, Anna; Winter, Christian

    2017-04-01

    The interaction of tidal, wave and wind forces primarily governs the morphodynamics of intertidal channel-shoal systems. Typical morphological changes comprise tidal channel meandering and/or migration with related shoal erosion or accretion. These intertidal flat systems are likely to response to accelerated sea level rise and to potential changes in storm frequency and direction. The aim of the ongoing research project is an evaluation of outer estuarine channel-shoal dynamics by combining the analysis of morphological monitoring data with high-resolution morphodynamic modelling. A focus is set on their evolution in reaction to different hydrodynamic forcings like tides, wind driven currents, waves under fair-weather and high energy conditions, and variable upstream discharges. As an example the Outer Weser region was chosen, and a tidal channel system serves as a reference site: Availability of almost annual bathymetrical observations of an approx. 10 km long tidal channel (Fedderwarder Priel) and its morphological development largely independent from maintenance dredging of the main Weser navigational channel make this tributary an ideal study area. The numerical modelling system Delft3D (Deltares) is applied to run real-time annual scenario simulations aiming to evaluate and to differentiate the morphological responses to distinct hydrodynamic drivers. A comprehensive morphological analysis of available observations at the FWP showed that the channel migration trends and directions are persistent at particular channel bends and meanders for the considered period of 14 years. Migration trends and directions are well reproduced by one-year model simulations. Morphodynamic modelling is applied to interpolate between observations and relate sediment dynamics to different forcing scenarios in the outer Weser estuary as a whole and at the scale of local tributary channels and flats.

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, L. M.

    This Work Plan outlines the scope of work that will be conducted to investigate the subsurface contaminant conditions at the property formerly leased by the Commodity Credit Corporation (CCC) in Ramona, Kansas (Figure 1.1). Data obtained during this event will be used to (1) evaluate potential source areas on the property, (2) determine the vertical and horizontal extent of potential contamination, and (3) provide recommendations for future actions, with the ultimate goal of assigning this site No Further Action status. The planned investigation includes groundwater monitoring requested by the Kansas Department of Health and Environment (KDHE), in accordance with Sectionmore » V of the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the United States Department of Agriculture (USDA). The work is being performed on behalf of the CCC/USDA by the Environmental Research Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy. Under the Intergovernmental Agreement, Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at former CCC/USDA grain storage facilities. Argonne has issued a Master Work Plan (Argonne 2002) that describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. The Master Work Plan was approved by the KDHE. It contains materials common to investigations at locations in Kansas and should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Ramona.« less

  1. 7 CFR 1781.4 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... improvement. (d) RC&D measure plan. A plan document for a land area, directly controlled or under the... area. (f) Watershed works of improvement. Structural, nonstructural, and land treatment measures... costs of installing WS works of improvement or RCD measures by the Federal Government and by sponsoring...

  2. 7 CFR 1781.4 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... improvement. (d) RC&D measure plan. A plan document for a land area, directly controlled or under the... area. (f) Watershed works of improvement. Structural, nonstructural, and land treatment measures... costs of installing WS works of improvement or RCD measures by the Federal Government and by sponsoring...

  3. 76 FR 12739 - Proposed Data Collections Submitted for Public Comment and Recommendations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-08

    ... Description The PHHS Block Grant program was established to provide awardees with a source of flexible funding... required to submit an annual application for funding (Work Plan) that describes its objectives and the... Work Plan, and 15 hours per [[Page 12740

  4. Work Plan for Comprehensive Groundwater Sampling (Operable Unit 2) April 2012

    EPA Pesticide Factsheets

    April 27, 2012 cover letter from Kirk Kessler, EPS, to Galo Jackson, EPA Region 4 and two OU2-related work plans for sampling at the LCP Chemicals Superfund Site, GA. Region ID: 04 DocID: 10922560, DocDate: 04-27-2012

  5. Education and Work in General Secondary Schools. Report of a Regional Planning Panel (Bangkok, Thailand, June 24-July 5, 1982).

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific, and Cultural Organization, Bangkok (Thailand). Regional Office for Education in Asia and the Pacific.

    This report summarizes the First APEID (Asian Programme of Educational Innovation for Development) Regional Planning Panel Meeting on Work and Vocational Experiences in General Education that focused on the linking of education to the world of work. An introduction gives an overview of the panel's aims, the basic principles and concepts advocated…

  6. 40 CFR 35.408 - Award limitations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... full delegation. (c) For permit and planning grants unless the work plan submitted with the application... funding under sections 106 (Water Pollution Control) and 205(j) (Water Quality Management Planning) of the Clean Water Act. Water Quality Management Planning Grants (Section 205(j)(2)) ...

  7. Planning of Educational Informatics Network (EIN)

    ERIC Educational Resources Information Center

    Çekiç, Osman; Kusçu, Meltem

    2017-01-01

    Planning is a concept that takes place all throughout one's life. People plan their education, work, private lives, and careers; in other words, they plan their entire lives to achieve specific desired outcomes. Not only do individuals plan which schools they will attend, but also where they should live and which jobs they should take. Similar to…

  8. Long Range Plan: 1992-1995.

    ERIC Educational Resources Information Center

    Pennsylvania Coll. of Technology, Williamsport.

    Intended to enhance strategic planning and enable staff to work as a team toward a shared vision and common goals, this report presents the 1992-95 long-range plan of the Pennsylvania College of Technology (PCT). Part I defines long-range planning; describes the structure and use of the plan at PCT; presents PCT's philosophy, mission, and vision…

  9. 32 CFR 644.8 - Planning and scheduling real estate activities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 4 2012-07-01 2011-07-01 true Planning and scheduling real estate activities... (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.8 Planning and scheduling real estate activities. (a) Normal scheduling. (1) The objective of a planned program is to provide for...

  10. 32 CFR 644.8 - Planning and scheduling real estate activities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 4 2013-07-01 2013-07-01 false Planning and scheduling real estate activities... (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.8 Planning and scheduling real estate activities. (a) Normal scheduling. (1) The objective of a planned program is to provide for...

  11. 32 CFR 644.8 - Planning and scheduling real estate activities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 4 2014-07-01 2013-07-01 true Planning and scheduling real estate activities... (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.8 Planning and scheduling real estate activities. (a) Normal scheduling. (1) The objective of a planned program is to provide for...

  12. Intelligent control of a planning system for astronaut training.

    PubMed

    Ortiz, J; Chen, G

    1999-07-01

    This work intends to design, analyze and solve, from the systems control perspective, a complex, dynamic, and multiconstrained planning system for generating training plans for crew members of the NASA-led International Space Station. Various intelligent planning systems have been developed within the framework of artificial intelligence. These planning systems generally lack a rigorous mathematical formalism to allow a reliable and flexible methodology for their design, modeling, and performance analysis in a dynamical, time-critical, and multiconstrained environment. Formulating the planning problem in the domain of discrete-event systems under a unified framework such that it can be modeled, designed, and analyzed as a control system will provide a self-contained theory for such planning systems. This will also provide a means to certify various planning systems for operations in the dynamical and complex environments in space. The work presented here completes the design, development, and analysis of an intricate, large-scale, and representative mathematical formulation for intelligent control of a real planning system for Space Station crew training. This planning system has been tested and used at NASA-Johnson Space Center.

  13. Data categories for marine planning

    USGS Publications Warehouse

    Lightsom, Frances L.; Cicchetti, Giancarlo; Wahle, Charles M.

    2015-01-01

    The U.S. National Ocean Policy calls for a science- and ecosystem-based approach to comprehensive planning and management of human activities and their impacts on America’s oceans. The Ocean Community in Data.gov is an outcome of 2010–2011 work by an interagency working group charged with designing a national information management system to support ocean planning. Within the working group, a smaller team developed a list of the data categories specifically relevant to marine planning. This set of categories is an important consensus statement of the breadth of information types required for ocean planning from a national, multidisciplinary perspective. Although the categories were described in a working document in 2011, they have not yet been fully implemented explicitly in online services or geospatial metadata, in part because authoritative definitions were not created formally. This document describes the purpose of the data categories, provides definitions, and identifies relations among the categories and between the categories and external standards. It is intended to be used by ocean data providers, managers, and users in order to provide a transparent and consistent framework for organizing and describing complex information about marine ecosystems and their connections to humans.

  14. Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    GRYGIEL, M.L.

    1998-10-08

    Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baselinemore » and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.« less

  15. Cast Off expansion plan by rapid improvement through Optimization tool design, Tool Parameters and using Six Sigma’s ECRS Technique

    NASA Astrophysics Data System (ADS)

    Gopalakrishnan, T.; Saravanan, R.

    2017-03-01

    Powerful management concepts step-up the quality of the product, time saving in producing the product thereby increase the production rate, improves tools and techniques, work culture, work place and employee motivation and morale. In this paper discussed about the case study of optimizing the tool design, tool parameters to cast off expansion plan according ECRS technique. The proposed designs and optimal tool parameters yielded best results and meet the customer demand without expansion plan. Hence the work yielded huge savings of money (direct and indirect cost), time and improved the motivation and more of employees significantly.

  16. Model Checking the Remote Agent Planner

    NASA Technical Reports Server (NTRS)

    Khatib, Lina; Muscettola, Nicola; Havelund, Klaus; Norvig, Peter (Technical Monitor)

    2001-01-01

    This work tackles the problem of using Model Checking for the purpose of verifying the HSTS (Scheduling Testbed System) planning system. HSTS is the planner and scheduler of the remote agent autonomous control system deployed in Deep Space One (DS1). Model Checking allows for the verification of domain models as well as planning entries. We have chosen the real-time model checker UPPAAL for this work. We start by motivating our work in the introduction. Then we give a brief description of HSTS and UPPAAL. After that, we give a sketch for the mapping of HSTS models into UPPAAL and we present samples of plan model properties one may want to verify.

  17. 7 CFR 25.403. - Ongoing 2-year work plan requirement.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 25.403. Agriculture Office of the Secretary of Agriculture RURAL EMPOWERMENT ZONES AND ENTERPRISE COMMUNITIES Post-Designation Requirements § 25.403. Ongoing 2-year work plan requirement. (a) Each Empowerment... conditional upon the designation of the community as an Empowerment Zone; and (iv) Documentation of...

  18. 7 CFR 25.403. - Ongoing 2-year work plan requirement.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 25.403. Agriculture Office of the Secretary of Agriculture RURAL EMPOWERMENT ZONES AND ENTERPRISE COMMUNITIES Post-Designation Requirements § 25.403. Ongoing 2-year work plan requirement. (a) Each Empowerment... conditional upon the designation of the community as an Empowerment Zone; and (iv) Documentation of...

  19. 7 CFR 25.403. - Ongoing 2-year work plan requirement.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 25.403. Agriculture Office of the Secretary of Agriculture RURAL EMPOWERMENT ZONES AND ENTERPRISE COMMUNITIES Post-Designation Requirements § 25.403. Ongoing 2-year work plan requirement. (a) Each Empowerment... conditional upon the designation of the community as an Empowerment Zone; and (iv) Documentation of...

  20. 7 CFR 1710.251 - Construction work plans-distribution borrowers.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Construction work plans-distribution borrowers. 1710...—distribution borrowers. (a) All distribution borrowers must maintain a current CWP approved by their board of directors covering all new construction, improvements, replacements, and retirements of distribution and...

  1. Enhancing Job Performance

    ERIC Educational Resources Information Center

    Devlin, Patricia

    2011-01-01

    The impact of the Self-Determined Career Development Model (hereafter called the Self-Determined Career Model) on the job performance of four adults with moderate intellectual disability employed in competitive work settings was examined. Employees learned to set work-related goals, develop an action plan, implement the plan, and adjust their…

  2. Information Sources and Retirement Savings of Working Women

    ERIC Educational Resources Information Center

    Hsua, Chungwen

    2016-01-01

    This study examined how retirement planning information search was related to retirement savings of working women. By controlling for sociodemographic variables, the study further explored factors associated with individual information sources for retirement planning. An online survey was developed to collect data from a national population,…

  3. Zur Rolle von Plansprachen im terminologiewissenschaftlichen Werk von Eugen Wuster (The Role of Planned Languages in Eugen Wuster's Work on Terminology Science).

    ERIC Educational Resources Information Center

    Blanke, Detlev

    1998-01-01

    Discusses the relationship between planned languages and specialized technical languages, with particular reference to Esperanto, and analyzes its significance for several aspects of Eugen Wuster's (the founder of terminology science) work. (Author/VWL)

  4. 7 CFR 25.403. - Ongoing 2-year work plan requirement.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 25.403. Agriculture Office of the Secretary of Agriculture RURAL EMPOWERMENT ZONES AND ENTERPRISE COMMUNITIES Post-Designation Requirements § 25.403. Ongoing 2-year work plan requirement. (a) Each Empowerment... conditional upon the designation of the community as an Empowerment Zone; and (iv) Documentation of...

  5. NASA scheduling technologies

    NASA Technical Reports Server (NTRS)

    Adair, Jerry R.

    1994-01-01

    This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.

  6. Preferred Provider Organization (PPO) Plans

    MedlinePlus

    ... Find & compare doctors, hospitals, & other providers Preferred Provider Organization (PPO) Plans How PPO Plans Work A Medicare ... extra for these benefits. Related Resources Health Maintenance Organization (HMO) Private Fee-for-Service (PFFS) Special Needs ...

  7. Issues in NASA Program and Project Management: Focus on Project Planning and Scheduling

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1997-01-01

    Topics addressed include: Planning and scheduling training for working project teams at NASA, overview of project planning and scheduling workshops, project planning at NASA, new approaches to systems engineering, software reliability assessment, and software reuse in wind tunnel control systems.

  8. EOS Terra Terra Constellation Exit/Future Maneuver Plans Update

    NASA Technical Reports Server (NTRS)

    Mantziaras, Dimitrios

    2016-01-01

    This EOS Terra Constellation Exit/Future Maneuver Plans Update presentation will discuss brief history of Terra EOM work; lifetime fuel estimates; baseline vs. proposed plan origin; resultant exit orbit; baseline vs. proposed exit plan; long term orbit altitude; revised lifetime proposal and fallback options.

  9. The space shuttle payload planning working groups: Executive summaries

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The findings of a space shuttle payload planning group session are presented. The purpose of the workshop is: (1) to provide guidance for the design and development of the space shuttle and the spacelab and (2) to plan a space science and applications program for the 1980 time period. Individual groups were organized to cover the various space sciences, applications, technologies, and life sciences. Summaries of the reports submitted by the working groups are provided.

  10. The career intentions, work-life balance and retirement plans of dental undergraduates at the University of Bristol.

    PubMed

    Puryer, J; Patel, A

    2016-02-26

    Aim To investigate the career intentions, work-life balance and retirement plans of dental undergraduates at the University of Bristol in 2015.Method Cross-sectional survey of 210 clinical undergraduates using an anonymous self-report questionnaire.Results The response rate was 79%. The majority (81.7%) were 'satisfied' or 'extremely satisfied' with their choice of career. The majority (78.7%) felt men and women are equally likely to succeed in dentistry, although 42.9% felt men had an advantage over women with regards to career success. The majority (81.6%) intend on working within general practice, 11.3% within hospital dental services and 2.1% within community dental services. The majority (70.5%) intend to specialise within dentistry. Only 1.8% of participants intend on providing only National Health Service (NHS) dental treatment whereas the 86.5% would provide both NHS and private dental treatment. Fifteen years after qualifying, 52.2% plan to work part-time, and 37.8% intend on retiring at the age of 60 or below. The majority (86.6%) felt that childcare should be shared equally between both parents. Female students intend to take more time out of their career to concentrate on childcare and felt that having a child would affect their career more than males.Conclusion The anticipated career plans, work-life balance and retirement plans of undergraduates change over time, and further research should be carried out to monitor future career intentions of dental students in order to help with dental workforce planning.

  11. Working Memory and Cognitive Flexibility Mediates Visuoconstructional Abilities in Older Adults with Heterogeneous Cognitive Ability.

    PubMed

    Ávila, Rafaela T; de Paula, Jonas J; Bicalho, Maria A; Moraes, Edgar N; Nicolato, Rodrigo; Malloy-Diniz, Leandro F; Diniz, Breno S

    2015-05-01

    Previous studies suggest that executive functions influence the performance on visuoconstructional tasks. This study aims to investigate whether the relationship between planning ability and the copy of complex figures is mediated by distinct components of executive functions (i.e., working memory, inhibitory control and cognitive flexibility). We included a 129 older adults with Alzheimer's disease (n=36, AD), mild cognitive impairment (MCI, n=67), and with no evidence of cognitive impairment (controls, n=26). We evaluated the mediation effect of planning abilities, working memory, cognitive flexibility and inhibitory control on visuoconstructional tasks using a multiple mediation models. We found a significant direct effect of planning on visuoconstructional abilities and a partial mediation effect of working memory and cognitive flexibility on visuoconstructional abilities. The present results indicate that the performance on visuoconstructional task is mediated by multiple interrelated executive functions components, in particular working memory and cognitive flexibility.

  12. Satisfaction with work-life balance and the career and retirement plans of US oncologists.

    PubMed

    Shanafelt, Tait D; Raymond, Marilyn; Kosty, Michael; Satele, Daniel; Horn, Leora; Pippen, John; Chu, Quyen; Chew, Helen; Clark, William Benton; Hanley, Amy E; Sloan, Jeff; Gradishar, William J

    2014-04-10

    To evaluate satisfaction with work-life balance (WLB) and career plans of US oncologists. The American Society of Clinical Oncology conducted a survey of US oncologists evaluating satisfaction with WLB and career plans between October 2012 and March 2013. The sample included equal numbers of men and women from all career stages. Of 2,998 oncologists contacted, 1,490 (49.7%) returned surveys. From 1,117 oncologists (37.3% of overall sample) completing full-length surveys, we evaluated satisfaction with WLB and career plans among the 1,058 who were not yet retired. The proportion of oncologists satisfied with WLB (n = 345; 33.4%) ranked lower than that reported for all other medical specialties in a recent national study. Regarding career plans, 270 oncologists (26.5%) reported a moderate or higher likelihood of reducing their clinical work hours in the next 12 months, 351 (34.3%) indicated a moderate or higher likelihood of leaving their current position within 24 months, and 273 (28.5%) planned to retire before 65 years of age. Multivariable analyses found women oncologists (odds ratio [OR], 0.458; P < .001) and those who devoted greater time to patient care (OR for each additional hour, 0.977; P < .001) were less likely to be satisfied with WLB. Satisfaction with WLB and burnout were the strongest predictors of intent to reduce clinical work hours and leave current position on multivariable analysis. Satisfaction with WLB among US oncologists seems lower than for other medical specialties. Dissatisfaction with WLB shows a strong relationship with plans to reduce hours and leave current practice. Given the pending US oncologist shortage, additional studies exploring interactions among WLB, burnout, and career satisfaction and their impact on career and retirement plans are warranted.

  13. Satisfaction With Work-Life Balance and the Career and Retirement Plans of US Oncologists

    PubMed Central

    Shanafelt, Tait D.; Raymond, Marilyn; Kosty, Michael; Satele, Daniel; Horn, Leora; Pippen, John; Chu, Quyen; Chew, Helen; Clark, William Benton; Hanley, Amy E.; Sloan, Jeff; Gradishar, William J.

    2014-01-01

    Purpose To evaluate satisfaction with work-life balance (WLB) and career plans of US oncologists. Methods The American Society of Clinical Oncology conducted a survey of US oncologists evaluating satisfaction with WLB and career plans between October 2012 and March 2013. The sample included equal numbers of men and women from all career stages. Results Of 2,998 oncologists contacted, 1,490 (49.7%) returned surveys. From 1,117 oncologists (37.3% of overall sample) completing full-length surveys, we evaluated satisfaction with WLB and career plans among the 1,058 who were not yet retired. The proportion of oncologists satisfied with WLB (n = 345; 33.4%) ranked lower than that reported for all other medical specialties in a recent national study. Regarding career plans, 270 oncologists (26.5%) reported a moderate or higher likelihood of reducing their clinical work hours in the next 12 months, 351 (34.3%) indicated a moderate or higher likelihood of leaving their current position within 24 months, and 273 (28.5%) planned to retire before 65 years of age. Multivariable analyses found women oncologists (odds ratio [OR], 0.458; P < .001) and those who devoted greater time to patient care (OR for each additional hour, 0.977; P < .001) were less likely to be satisfied with WLB. Satisfaction with WLB and burnout were the strongest predictors of intent to reduce clinical work hours and leave current position on multivariable analysis. Conclusion Satisfaction with WLB among US oncologists seems lower than for other medical specialties. Dissatisfaction with WLB shows a strong relationship with plans to reduce hours and leave current practice. Given the pending US oncologist shortage, additional studies exploring interactions among WLB, burnout, and career satisfaction and their impact on career and retirement plans are warranted. PMID:24616305

  14. The IAU Division A Working Group on the Third Realization of the ICRF: Background, Goals, Plans

    NASA Astrophysics Data System (ADS)

    Gaume, Ralph

    2015-08-01

    The XXVIII General Assembly of the IAU (Beijing, 2012) established the Division A Working Group on the Third Realization of the International Celestial Reference Frame (ICRF). The adopted charter of the ICRF3 Working Group includes a commitment to report on the implementation and execution plans for ICRF3 during the XXIX General Assembly of the IAU along with a targeted completion and presentation of ICRF3 in 2018 to the XXX General Assembly for adoption. This talk will discuss the background, purpose, and overall implementation plan for ICRF3, and motivate the concept, currently under consideration by the ICRF3 Working Group, that future realizations of the ICRF be based on multi-frequency astrometric data, starting with ICRF3.

  15. 77 FR 37683 - Statement of Organization, Functions, and Delegations of Authority

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-22

    ... update of strategic plans and performance goals. Oversees the CMS Challenge Competition, working with... strategic plans with Department of Health and Human Services' 5-year strategic plan and performance goals...

  16. Camp Minden Draft QASP and Work Plan for Public Feedback

    EPA Pesticide Factsheets

    ESI has developed these operational plans, technical approaches, and related required resources based upon extensive review and planning for material removal, transportation, staging, and Contained Burn Chamber (CBC) destruction of materials.

  17. 18 CFR 708.4 - Required programs and reports.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... part of the Master Plan—Plan of Study. The work plan shall satisfy minimum standards described in this... related to implementation of the Master Plan. These recommendations shall be based on evaluation of...

  18. From Welfare to Work: Dynamic Lesson Plans for ESL Learners. Final Report. Fiscal Year 1998-99 [and] From Welfare to Work: Lessons for ESL Learners.

    ERIC Educational Resources Information Center

    Center for Literacy, Inc., Philadelphia, PA.

    This document combines a final project report and the resulting guidebook of 20 lesson plans for English as a second language (ESL) instructors to help learners work within the Temporary Assistance to Needy Families (TANF) system and acquire effective job readiness strategies, choose a career path, and pursue employment. The report describes the…

  19. Defense Commissary Resale Stock Fund Financial Statements For FY 1992

    DTIC Science & Technology

    1993-06-30

    present DeCA’s accounting procedures during FY 1992. We understand DeCA is aggressively working to improve its financial management system. However...the year ended September 30, 1992, we considered the related internal control structure. The purpose of the planning work was to determine the...auditing procedures we would apply for the purposes of expressing our opinion on the Financial Statements. Planning work included obtaining an

  20. Pensions, tax and the anaesthetist: significant implications for workforce planning.

    PubMed

    Pandit, J J

    2016-08-01

    This paper shows how recent tax changes to pensions (i.e. new lifetime and annual allowance contribution limits) mean that NHS consultants will need to adopt one of four rational strategies to work and financial planning. Two of those strategies (termed 'Earn Fast, Drop Out' and 'Never Enter') involve a break between work and pensions. The logical consequence of this break is that consultants may exercise options to maximise their total income, which in turn will result in less work within the NHS and more work in alternative higher paying (e.g. private) sectors. A third strategy ('Go Slow, Stay Low') also involves less-than-full-time NHS work. Only one option ('Do Nothing' as a result of the tax changes) has no effect. In short, the tax changes will predictably lead to future senior consultants devoting proportionately much less of their time to NHS work than before. The article discusses the important implications of this conclusion for NHS workforce planning. © 2016 The Association of Anaesthetists of Great Britain and Ireland.

  1. A social survey on the noise impact in open-plan working environments in China.

    PubMed

    Zhang, Mei; Kang, Jian; Jiao, Fenglei

    2012-11-01

    The aim of this study is to reveal noise impact in open-plan working environments in China, through a series of questionnaire surveys and acoustic measurements in typical open-plan working environments. It has been found that compared to other physical environmental factors in open-plan working environments, people are much less satisfied with the acoustic environment. The noise impact in the surveyed working environments is rather significant, in terms of sound level inside the office, understanding of colleagues' conversation, and the use of background music such as music players. About 30-50% of the interviewees think that various noise sources inside and outside offices are 'very disturbing' and 'disturbing', and the most annoying sounds include noises from outside, ventilation systems, office equipment, and keyboard typing. Using higher panels to separate work space, or working in enclosed offices, are regarded as effective improvement measures, whereas introducing natural sounds to mask unwanted sounds seems to be not preferable. There are significant correlations between the evaluation of acoustic environment and office symptoms, including hypersensitivity to loud sounds, easily getting tired and depression. There are also significant correlations between evaluation of various acoustics-related factors and certain statements relating to job satisfaction, including sensitivity to noise, as well as whether conversations could be heard by colleagues. Copyright © 2012 Elsevier B.V. All rights reserved.

  2. A Menu of Options for Developing Tribal Air Grant Work Plans and Managing Grants for Environmental Results

    EPA Pesticide Factsheets

    Tool to assist tribes that apply for Clean Air Act (CAA) funding to draft more effective work plans for projects that will develop tribal knowledge of air quality issues and build tribal expertise to manage air quality on tribal lands.

  3. Succession Planning for Management Staff at a Canadian Post Secondary Technical Institute.

    ERIC Educational Resources Information Center

    da Costa, Jose; Cembrowski, Barbara

    2001-01-01

    Analyzed interviews to explore how nine administrators, at three different career stages, perceived career-development and succession planning at a Canadian postsecondary technical institute. Managers attribute career success to possession of varied personal attributes, diverse work experiences, serendipity, and a fulfilling work environment. Job…

  4. Psychological and Organizational Correlates of Career Patterns in Clinical Laboratory Occupations.

    ERIC Educational Resources Information Center

    Jeswald, Thomas Anthony

    The purpose of the project was to provide research data concerning attitudes and satisfactions of present clinical laboratory employees which would be helpful in planning future recruitment and retention efforts. Questionnaires requesting information regarding the personal and work histories, work attitudes, career plans, and need satisfaction of…

  5. Planning Guide for Implementing a Quality Youth Apprenticeship Program in Georgia.

    ERIC Educational Resources Information Center

    Smith, Clifton L.

    This planning guide begins with an overview of school-to-work transition. Section 1 also provides an overview of federal and Georgia state legislation and describes current school-to-work transition efforts, such as tech prep education, youth apprenticeship, cooperative education, entrepreneurial ventures and school-based enterprises,…

  6. Academic Planning through Program Review: Can It Work?

    ERIC Educational Resources Information Center

    Fernandez, Thomas V.; Raab, Marjorie K.

    Nassau Community College (NCC) is currently working with a program evaluation model in which faculty from one department serve as peer evaluation consultants to direct the self-evaluations of other departments. The four functional objectives initially motivating the development of NCC's plan directed that: real decisions about academic programs…

  7. Individual Development Plans as Governance Tools--Changed Governance of Teachers' Work

    ERIC Educational Resources Information Center

    Parding, Karolina; Liljegren, Andreas

    2017-01-01

    Auditing, accountability, and transparency are concepts that greatly impact the working conditions of today's public sector professionals, including teachers. Documentation requirements have been on the increase for some time, which can be seen in the education sector's Individual Development Plans (IDPs), for example. These IDPs are pedagogical…

  8. Systemic Planning: An Annotated Bibliography and Literature Guide. Exchange Bibliography No. 91.

    ERIC Educational Resources Information Center

    Catanese, Anthony James

    Systemic planning is an operational approach to using scientific rigor and qualitative judgment in a complementary manner. It integrates rigorous techniques and methods from systems analysis, cybernetics, decision theory, and work programing. The annotated reference sources in this bibliography include those works that have been most influential…

  9. Internet Cigarette Sales: Giving ATF Investigative Authority May Improve Reporting and Enforcement

    DTIC Science & Technology

    2002-08-01

    one additional state that appeared, based on our Internet research and information from state officials we interviewed while planning our work, to have...state (Iowa) that appeared, based on our Internet research and information from state officials we interviewed while planning our work, to have taken

  10. WORK PLAN FOR COMPLETING A TECHNOLOGY ASSESSMENT OF WESTERN ENERGY RESOURCE DEVELOPMENT

    EPA Science Inventory

    This is a work plan for completing the final phase of a three year technology assessment of the development of six energy resources (coal, geothermal, natural gas, oil, oil shale, and uranium) in eight western states (Arizona, Colorado, Montana, New Mexico, North and South Dakota...

  11. 75 FR 3778 - Agency Information Collection Activities: Proposed Request and Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-22

    ..., or to evaluate a family bible or other family record when determining eligibility for benefits. The... per Response: 10 minutes. Estimated Annual Burden: 3,333 hours. 5. Work Incentives Planning and Assistance Program--0960-0629. The Work Incentives Planning and Assistance (WIPA) program collects...

  12. Comprehensive Planning.

    ERIC Educational Resources Information Center

    Pavlenko, Victor V.

    Comprehensive planning, defined as the work of those who engage in efforts, within a delimited geographic area, to identify and order the physical, social, and economic relationships of that area, is discussed in the four sections of this paper. Section I, Introduction, describes what "planning" and "comprehensive planning" are. In Section II, Why…

  13. MO-F-CAMPUS-T-05: SQL Database Queries to Determine Treatment Planning Resource Usage

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fox, C; Gladstone, D

    2015-06-15

    Purpose: A radiation oncology clinic’s treatment capacity is traditionally thought to be limited by the number of machines in the clinic. As the number of fractions per course decrease and the number of adaptive plans increase, the question of how many treatment plans a clinic can plan becomes increasingly important. This work seeks to lay the ground work for assessing treatment planning resource usage. Methods: Care path templates were created using the Aria 11 care path interface. Care path tasks included key steps in the treatment planning process from the completion of CT simulation through the first radiation treatment. SQLmore » Server Management Studio was used to run SQL queries to extract task completion time stamps along with care path template information and diagnosis codes from the Aria database. 6 months of planning cycles were evaluated. Elapsed time was evaluated in terms of work hours within Monday – Friday, 7am to 5pm. Results: For the 195 validated treatment planning cycles, the average time for planning and MD review was 22.8 hours. Of those cases 33 were categorized as urgent. The average planning time for urgent plans was 5 hours. A strong correlation between diagnosis code and range of elapsed planning time was as well as between elapsed time and select diagnosis codes was observed. It was also observed that tasks were more likely to be completed on the date due than the time that they were due. Follow-up confirmed that most users did not look at the due time. Conclusion: Evaluation of elapsed planning time and other tasks suggest that care paths should be adjusted to allow for different contouring and planning times for certain diagnosis codes and urgent cases. Additional clinic training around task due times vs dates or a structuring of care paths around due dates is also needed.« less

  14. Senior dental students' career intentions, work-life balance and retirement plans.

    PubMed

    Stewart, F M J; Drummond, J R; Carson, L; Theaker, E D

    2007-09-08

    To gather information from senior dental students about their future career plans, with particular emphasis on work-life balance issues, their attitudes towards the NHS and retirement plans. Senior dental students at the Universities of Dundee and Manchester were asked to complete a voluntary anonymous questionnaire. In all 141 questionnaires were completed, 42 by students in Manchester and 114 in Dundee. On qualification nearly all surveyed intend to work full time but after five years one quarter (26%) of females intend to work part time. This is significantly (p < 0.05) different from males where nearly all (98%) intend to work full time. Although the majority (65%) intend to work in general practice significant numbers (19%) wish to have a career in hospital dentistry and very few (3%) in community dentistry. Senior students seem to show no more commitment to the NHS than those in our previous study of dental school applicants. Only 3% intend to work exclusively for the NHS and 18% intend to work exclusively in the private sector. Surprising numbers had plans to retire or go part time before 60 years of age. Only 20% of the sample intended to continue working full time after the age of 60 years. The mode age that those surveyed intended to start a family was 30 years and a large majority of both sexes thought this would interrupt their professional life. More than half of the sample intend to take time out of dentistry until their children attended primary school (female 63%, male 38%) and 6% (female 6%, male 8%) until secondary school. Many of our findings suggest that future generations of dentists may have a pattern of professional life that will have the effect of reducing their clinical commitment, although it is not possible to determine how significant an effect this will have on the workforce. It may, however, be appropriate to take career intention into account when workforce planning.

  15. Proposal and work plan to calibrate and verify a water-quality model to simulate effects of wastewater discharges to the Red River of the North at drought streamflow near Fargo, North Dakota, and Moorhead, Minnesota

    USGS Publications Warehouse

    Wesolowski, Edwin A.

    2000-01-01

    This report presents a proposal for conducting a water-quality modeling study at drought streamflow, a detailed comprehensive plan for collecting the data, and an annual drought-formation monitoring plan. A 30.8 mile reach of the Red River of the North receives treated wastewater from plants at Fargo, North Dakota, and Moorhead, Minnesota, and streamflow from the Sheyenne River. The water-quality modeling study will evaluate the effects of continuous treated-wastewater discharges to the study reach at drought streamflow. The study will define hydraulic characteristics and reaeration and selected reaction coefficients and will calibrate and verity a model.The study includes collecting synoptic water-quality samples for various types of analyses at a number of sites in the study reach. Dye and gas samples will be collected for traveltime and reaeration measurements. Using the Lagrangian reference frame, synoptic water-quality samples will be collected for analysis of nutrients, chlorophyll a, alkalinity, and carbonaceous biochemical oxygen demand. Field measurements will be made of specific conductance, pH, air and water temperature, dissolved oxygen, and sediment oxygen demand. Two sets of water-quality data will be collected. One data set will be used to calibrate the model, and the other data set will be used to verity the model.The DAFLOW/BLTM models will be used to evaluate the effects of the treated wastewater on the water quality of the river. The model will simulate specific conductance, temperature, dissolved oxygen, carbonaceous biochemical oxygen demand, total nitrogen (organic, ammonia, nitrite, nitrate), total orthophosphorus, total phosphorus, and phytoplankton as chlorophyll a.The work plan identifies and discusses the work elements needed for accomplishing the data collection for the study. The work elements specify who will provide personnel, vehicles, instruments, and supplies needed during data collection. The work plan contains instructions for data collection; inventory lists of needed personnel, vehicles, instruments, and supplies; and examples of computations for determining quantities of tracer to be injected into the stream. The work plan also contains an annual drought-formation monitoring plan that includes a 9-month time line that specifies when essential planning actions must occur before actual project start up. Drought streamflows are rare. The annual drought-formation monitoring plan is presented to assist project planning by providing early warning that conditions are favorable to produce drought streamflow. The plan to monitor drought-forming conditions discusses the drought indices to be monitored. To establish a baseline, historic values for some of the drought indices for selected years were reviewed. An annual review of the drought indices is recommended.

  16. 29 CFR 1917.30 - Emergency action plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... emergency action and for reaction time for safe escape of employees from the workplace or the immediate work.... (ii) The employer shall review the plan with each employee covered by the plan at the following times...

  17. 29 CFR 1917.30 - Emergency action plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... emergency action and for reaction time for safe escape of employees from the workplace or the immediate work.... (ii) The employer shall review the plan with each employee covered by the plan at the following times...

  18. 29 CFR 1917.30 - Emergency action plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... emergency action and for reaction time for safe escape of employees from the workplace or the immediate work.... (ii) The employer shall review the plan with each employee covered by the plan at the following times...

  19. 29 CFR 1917.30 - Emergency action plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... emergency action and for reaction time for safe escape of employees from the workplace or the immediate work.... (ii) The employer shall review the plan with each employee covered by the plan at the following times...

  20. Integrated transportation scenario planning.

    DOT National Transportation Integrated Search

    2010-07-01

    Regional land usetransportation scenario planning emerged as a planning technique in U.S. : metropolitan areas in the 1990s. Building on prior work by this research team, this study continues : to track the development and expansion of regional sc...

  1. 31. Photographic copy of architects plan dated October 1919 (original ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    31. Photographic copy of architects plan dated October 1919 (original in possession of Montana State University, Bozeman, Montana.) BASEMENT PLAN - Hardin City Water Works, 101 East Fourth Street, Hardin, Big Horn County, MT

  2. Making a successful transition to cash balance. Using employee choice and financial education.

    PubMed

    Scahill, P; Wiley, P

    2000-01-01

    As employee work patterns change, the need for flexible plan design has increased. Hybrid plans such as cash balance plans offer a plan design variation that incorporates elements of the traditional defined benefit plan as well as those of defined contribution plans. This article examines plan design trends and discusses both negative and positive reactions to those trends. Finally, the solution of offering choice to plan participants is suggested, and the issues that must be considered are discussed.

  3. Addendum to Air Quality: Decision Support Tools, Partner Plans, Working Groups, Committees

    NASA Technical Reports Server (NTRS)

    Holekamp, Kara; Frisbie, Troy; Estep, Lee

    2005-01-01

    In the original report dated February 11, 2005, the utility of NASA Earth science data in the air quality activities of other agencies and organizations was assessed by reviewing strategic and mission plans and by conducting personal interviews with agency experts to identify and investigate agencies with the potential for partnership with NASA. The overarching agency strategic plans were reviewed and commonalities such as the desire for partnerships and technology development were noted. This addendum to the original report contains such information about the Tennessee Valley Authority and will be inserted as Section 2.6 of "Air Quality: Decision Support Tools, Partner Plans, Working Groups, Committees."

  4. Addendum to Air Quality: Decision Support Tools, Partner Plans, Working Groups, Committees

    NASA Technical Reports Server (NTRS)

    Holekamp, Kara; Frisbie, Troy; Estep, Lee

    2005-01-01

    In the original report dated February 11, 2005, the utility of the NASA Earth science data in the air quality activities of other agencies and organizations was assessed by reviewing strategic and mission plans and by conducting personal interviews with agency experts to identify and investigate agencies with the potential for partnership with NASA. The overarching agency strategic plans were reviewed and commonalities such as the desire for partnerships and technology development were noted. The addendum to the original report contains such information about the Tennessee Valley Authority and will be inserted in Section 2.6 of "Air Quality Decision Support Tools, Partner Plans, Working Groups, Committees".

  5. Automated Procurement System (APS): Project management plan (DS-03), version 1.2

    NASA Technical Reports Server (NTRS)

    Murphy, Diane R.

    1994-01-01

    The National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC) is implementing an Automated Procurement System (APS) to streamline its business activities that are used to procure goods and services. This Project Management Plan (PMP) is the governing document throughout the implementation process and is identified as the APS Project Management Plan (DS-03). At this point in time, the project plan includes the schedules and tasks necessary to proceed through implementation. Since the basis of APS is an existing COTS system, the implementation process is revised from the standard SDLC. The purpose of the PMP is to provide the framework for the implementation process. It discusses the roles and responsibilities of the NASA project staff, the functions to be performed by the APS Development Contractor (PAI), and the support required of the NASA computer support contractor (CSC). To be successful, these three organizations must work together as a team, working towards the goals established in this Project Plan. The Project Plan includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

  6. Customizing for clients: developing a library liaison program from need to plan.

    PubMed

    Tennant, M R; Butson, L C; Rezeau, M E; Tucker, P J; Boyle, M E; Clayton, G

    2001-01-01

    Building on the experiences of librarian representatives to curriculum committees in the colleges of dentistry, medicine, and nursing, the Health Science Center Libraries (HSCL) Strategic Plan recommended the formation of a Library Liaison Work Group to create a formal Library Liaison Program to serve the six Health Science Center (HSC) colleges and several affiliated centers and institutes. The work group's charge was to define the purpose and scope of the program, identify models of best practice, and recommend activities for liaisons. The work group gathered background information, performed an environmental scan, and developed a philosophy statement, a program of liaison activities focusing on seven primary areas, and a forum for liaison communication. Hallmarks of the plan included intensive subject specialization (beyond collection development), extensive communication with users, and personal information services. Specialization was expected to promote competence, communication, confidence, comfort, and customization. Development of the program required close coordination with other strategic plan implementation teams, including teams for collection development, education, and marketing. This paper discusses the HSCL's planning process and the resulting Library Liaison Program. Although focusing on an academic health center, the planning process and liaison model may be applied to any library serving diverse, subject-specific user populations.

  7. Customizing for clients: developing a library liaison program from need to plan*

    PubMed Central

    Tennant, Michele R.; Butson, Linda C.; Rezeau, Michelle E.; Tucker, Prudence J.; Boyle, Marian E.; Clayton, Greg

    2001-01-01

    Building on the experiences of librarian representatives to curriculum committees in the colleges of dentistry, medicine, and nursing, the Health Science Center Libraries (HSCL) Strategic Plan recommended the formation of a Library Liaison Work Group to create a formal Library Liaison Program to serve the six Health Science Center (HSC) colleges and several affiliated centers and institutes. The work group's charge was to define the purpose and scope of the program, identify models of best practice, and recommend activities for liaisons. The work group gathered background information, performed an environmental scan, and developed a philosophy statement, a program of liaison activities focusing on seven |primary areas, and a forum for liaison communication. Hallmarks of the plan included intensive subject specialization (beyond collection development), extensive communication with users, and personal information services. Specialization was expected to promote competence, communication, confidence, comfort, and customization. Development of the program required close coordination with other strategic plan implementation teams, including teams for collection development, education, and marketing. This paper discusses the HSCL's planning process and the resulting Library Liaison Program. Although focusing on an academic health center, the planning process and liaison model may be applied to any library serving diverse, subject-specific user populations. PMID:11209807

  8. 7 CFR 761.10 - Planning and performing construction and other development.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 7 2011-01-01 2011-01-01 false Planning and performing construction and other... Provisions § 761.10 Planning and performing construction and other development. (a) Purpose. This section describes Agency policies regarding the planning and performing of construction and other development work...

  9. Village family planning volunteers in Indonesia: their role in the family planning programme.

    PubMed

    Utomo, Iwu Dwisetyani; Arsyad, Syahmida S; Hasmi, Eddy Nurul

    2006-05-01

    Family planning was once a sensitive issue in Indonesia, but today it is considered essential. This paper reports on a study in 1997-98 of the role of village family planning volunteers and the cadres who worked under them in West Java, Central Java and DI Yogyakarta, in implementing the national family planning programme in Indonesia. A total of 108 village family planning volunteers, 108 family planning cadres, 108 local leaders and 324 couples eligible for family planning from 36 villages in the three provinces were interviewed. The volunteers and cadres have made a significant contribution to the implementation of the family planning programme. They promote family planning, organise meetings, provide information, organise income-generation activities, give savings and credit assistance, collect and report data and deliver other family welfare services. Teachers, wives of government officials and others recognised by the community as better off in terms of education and living conditions were most often identified to become family planning volunteers. Because they are women and because they are the most distant arm of the programme, their work is taken for granted. As their activities are directed towards women, especially in women's traditional roles, the programme tends to entrench the existing gender gap in responsibility for family planning and family welfare.

  10. Research on the Intensity Analysis and Result Visualization of Construction Land in Urban Planning

    NASA Astrophysics Data System (ADS)

    Cui, J.; Dong, B.; Li, J.; Li, L.

    2017-09-01

    As a fundamental work of urban planning, the intensity analysis of construction land involves many repetitive data processing works that are prone to cause errors or data precision loss, and the lack of efficient methods and tools to visualizing the analysis results in current urban planning. In the research a portable tool is developed by using the Model Builder technique embedded in ArcGIS to provide automatic data processing and rapid result visualization for the works. A series of basic modules provided by ArcGIS are linked together to shape a whole data processing chain in the tool. Once the required data is imported, the analysis results and related maps and graphs including the intensity values and zoning map, the skyline analysis map etc. are produced automatically. Finally the tool is installation-free and can be dispatched quickly between planning teams.

  11. Planning Assembly Of Large Truss Structures In Outer Space

    NASA Technical Reports Server (NTRS)

    De Mello, Luiz S. Homem; Desai, Rajiv S.

    1992-01-01

    Report dicusses developmental algorithm used in systematic planning of sequences of operations in which large truss structures assembled in outer space. Assembly sequence represented by directed graph called "assembly graph", in which each arc represents joining of two parts or subassemblies. Algorithm generates assembly graph, working backward from state of complete assembly to initial state, in which all parts disassembled. Working backward more efficient than working forward because it avoids intermediate dead ends.

  12. Verifying AI Plan Models: Even the Best Laid Plans Need to be Verified

    NASA Technical Reports Server (NTRS)

    Smith, Margaret; Cucullu, Gordon; Holzmann, Gerard; Smith, Benjamin

    2004-01-01

    This viewgraph presentation reviews work on model checking, and specifically the SPIN model checker. The goal of this work is to retire a significant class of risks associated with the use of Artificial Intelligence (Al) Planners on Missions. This effort must provide tangible testing results to a mission using Al technology. It is hoped that the work should be possible to leverage the technique and tools throughout NASA

  13. IMMR Phase 1 Prototyping Plan Inputs

    NASA Technical Reports Server (NTRS)

    Vowell, C. W.; Johnson-Throop, Kathy; Smith, Bryon; Darcy, Jeannette

    2006-01-01

    This viewgraph presentation reviews the phase I plan of the prototype of the IMMR by the Multilateral Medical Operations Panel (MMOP) Medical Informatics & Technology (MIT) Working Group. It reviews the Purpose of IMMR Prototype Phase 1 (IPP1); the IPP1 Plan Overview, the IMMR Prototype Phase 1 Plan for PDDs and MIC and MIC-DDs, Plan for MICs, a nd the IPP1 objectives

  14. Writing a group practice business plan.

    PubMed

    Reiboldt, J M

    1999-07-01

    A business plan offers group practices a blueprint to accomplish a variety of goals, such as securing capital, marketing the practice's services, recruiting new employees, developing a strategic plan or a budget, or planning for growth. A business plan should be informative, specific, and visionary. Elements that every business plan should address are a mission statement, strategy, planning, management information, and action scheme. A business plan should include certain information in a prescribed order. By writing a realistic business plan, group practices can work more efficiently and minimize the risk of not meeting their financial projections.

  15. Psychotherapeutic and vocational interventions among young adults with work disability due to mental disorders in Finland.

    PubMed

    Mattila-Holappa, Pauliina; Joensuu, Matti; Ahola, Kirsi; Kivekäs, Teija; Kivimäki, Mika; Koskinen, Aki; Virtanen, Marianna

    2018-05-01

    Backround: Little is known about treatment and rehabilitation received and planned among young adults with work disability due to a mental disorder. To examine the implemented psychotherapeutic and vocational interventions and treatment plans among young adults with work disability due to a mental disorder. Data were collected from medical records of young Finnish adults aged 18-34 with a long-term work disability history due to a mental disorder (N = 1163). The participant characteristics associated with four types of interventions were analyzed using log-binomial regression analysis. In total, 34% had participated in a psychotherapeutic intervention. Of the non-students, 26% had participated in vocational intervention. For 46% of the non-students, neither type of intervention was planned. Both implemented and planned psychotherapeutic interventions were associated with female sex, high education, attachment to employment, and absence of substance abuse. Low education and childhood adversity were associated with implemented vocational interventions and absence of substance abuse with planned vocational interventions. There is an unmet need for psychotherapeutic interventions among men, among those with lower socio-economic status, and among those with poor attachment to labor market. In addition, there is a lack of vocational interventions for those with high education. People with substance abuse are largely excluded from both types of interventions.

  16. 40 CFR 35.917-9 - Revision or amendment of facilities plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-9 Revision or amendment of facilities plan. A facilities plan may provide the basis...

  17. 40 CFR 35.917-9 - Revision or amendment of facilities plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-9 Revision or amendment of facilities plan. A facilities plan may provide the basis...

  18. 40 CFR 35.917-9 - Revision or amendment of facilities plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-9 Revision or amendment of facilities plan. A facilities plan may provide the basis...

  19. 40 CFR 35.917-9 - Revision or amendment of facilities plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-9 Revision or amendment of facilities plan. A facilities plan may provide the basis...

  20. 10 CFR 905.19 - How are plans and reports reviewed and approved?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... provide a notice of deficiencies to the entity that submitted the plan or report. Western, working together with the entity, will determine the time allowable for resubmitting the plan or report. However...

  1. 33. Photographic copy of architects plan dated October 1919 (original ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. Photographic copy of architects plan dated October 1919 (original in Possession of Montana State University, Bozeman Montana.) SECOND FLOOR PLAN - Hardin City Water Works, 101 East Fourth Street, Hardin, Big Horn County, MT

  2. 32. Photographic copy of architects plan dated October 1919 (original ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    32. Photographic copy of architects plan dated October 1919 (original in possession of Montana State University, Bozeman, Montana.) FIRST FLOOR PLAN - Hardin City Water Works, 101 East Fourth Street, Hardin, Big Horn County, MT

  3. Citizen Transportation Planning: A Working Model

    DOT National Transportation Integrated Search

    1998-09-16

    All communities, regardless of their location or size, face the need to re-think : and plan their transportation futures. Historically, many communities have left : planning to outside sources; whether it was the district level of a state's : transpo...

  4. Performance measurement: A tool for program control

    NASA Technical Reports Server (NTRS)

    Abell, Nancy

    1994-01-01

    Performance measurement is a management tool for planning, monitoring, and controlling as aspects of program and project management--cost, schedule, and technical requirements. It is a means (concept and approach) to a desired end (effective program planning and control). To reach the desired end, however, performance measurement must be applied and used appropriately, with full knowledge and recognition of its power and of its limitations--what it can and cannot do for the project manager. What is the potential of this management tool? What does performance measurement do that a traditional plan vs. actual technique cannot do? Performance measurement provides an improvement over the customary comparison of how much money was spent (actual cost) vs. how much was planned to be spent based on a schedule of activities (work planned). This commonly used plan vs. actual comparison does not allow one to know from the numerical data if the actual cost incurred was for work intended to be done.

  5. Plan now to make your retirement active, productive.

    PubMed

    Schlepp, S

    1989-12-01

    In his book Planning to the Years Ahead, Lester I. Tenney, PhD, professor emeritus at Arizona State University, Tempe, links Abraham Maslow's hierarchy of needs to retirement planning. According to Maslow, economic and security needs can be achieved through a family environment (eg, food clothing, shelter), and social acceptance, self-worth, and self-satisfaction can be achieved from social interaction, work, or leisure activities. After the basic needs of food, clothing, and shelter have been achieved, people are able to move to the next level of achieving safety and security. The level of dependency that people have on satisfying these needs through work will determine how well they are at adapting to retirement. The more people depend on work alone, the harder will be the adjustment; people who are less dependent on work will find retirement easier to accept.

  6. Balancing Work and Family Life. ERIC Digest No. 110.

    ERIC Educational Resources Information Center

    Kerka, Sandra

    Career and vocational educators must prepare people with the attitudes and skills needed for successful integration of work and family life. Ideally, life and career planning should be taught as a unit beginning in the middle school. A life/career planning course should incorporate such topics as interdependence of individual, family, and career…

  7. Cityworks: A Strategic Planning Model for Workforce Education and Training.

    ERIC Educational Resources Information Center

    City Coll. of San Francisco, CA.

    In an effort to become more responsive to students' needs regarding the current and future labor market, California's City College of San Francisco (CCSF) developed "CityWorks," a strategic plan for workforce education and training. This report provides background to the development of CityWorks and describes key goals and strategies.…

  8. 36 CFR 327.30 - Shoreline Management on Civil Works Projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ADMINISTERED BY THE CHIEF OF ENGINEERS § 327.30 Shoreline Management on Civil Works Projects. (a) Purpose. The... this regulation, shoreline management plans are not required for those projects where construction was... approval, one copy of each project Shoreline Management Plan will be forwarded to HQUSACE (CECW-ON) WASH DC...

  9. Educational Reform and the World of Work: Italy

    ERIC Educational Resources Information Center

    von Blumenthal, Viktor

    1977-01-01

    One of a four-issue series on educational reform and the world of work in Europe, this issue discusses educational planning and secondary school reform in Italy. Topics discussed include planning and research in vocational-technical education, and the relation between acquisition of specific skills and scientific and technical progress. (Author/DB)

  10. SUPERFUND TREATABILITY CLEARINGHOUSE: WORK PLAN FOR BIODEGRADATION OF POLY-CHLORINATED BIPHENYLS (PCBS) AT A SUPERFUND SITE

    EPA Science Inventory

    This document is composed of a work plan and additional technical information which demonstrates the qualifications of Detox Industries, Inc. to conduct remediation of a PCB contaminated sludge at General Motors (GM) plant in New York. Provided are the results of a field demons...

  11. An Introduction to the Transition to Work Simulator.

    ERIC Educational Resources Information Center

    Conroy, William G., Jr.

    The transition to work simulator (TWS) was developed as a policy tool for education and manpower planning. It was designed in anticipation of the Education Amendments of 1976 and the Youth Employment and Demonstration Projects Act of 1977 to facilitate comprehensive planning. TWS is a computerized simulation model of the stream of important…

  12. Ecological Approaches to Transition Planning for Students with Autism and Asperger's Syndrome

    ERIC Educational Resources Information Center

    Dente, Claire L.; Parkinson Coles, Kallie

    2012-01-01

    This article presents a compelling case for the increased role of social workers in work with individuals with autism and Asperger's syndrome in secondary school settings, specifically in transition planning for postsecondary educational pursuits. Social work education prepares social workers to address micro, mezzo, and macro levels of practice…

  13. Library Automation and Facility Planning.

    ERIC Educational Resources Information Center

    Cohen, Aaron; Cohen, Elaine

    This seminar and workbook are designed to aid librarians in planning and designing attractive and efficient libraries in light of the changing technologies of the 1980s. It is based on the premise that the electronic revolution of the 1980s will cause substantial changes in the work force, work processes, and the nature of physical layouts of…

  14. Reassessing Differences in Work and Income in Cohabitation and Marriage

    ERIC Educational Resources Information Center

    Kuperberg, Arielle

    2012-01-01

    Are cohabiters different than married couples who cohabited before marriage? This study used the 2002 wave of the National Survey of Families and Households to determine how work behavior might differ for 4 relationship types: (a) cohabiters with uncertain marriage plans, (b) cohabiters with definite marriage plans, (c) premarital cohabiters who…

  15. Plan of Work for Rural Development in North Carolina, July 1, 1975 - June 30, 1976.

    ERIC Educational Resources Information Center

    Hyatt, George, Jr.; And Others

    Serving primarily as a policy group for local Rural Development Panels, the North Carolina Rural Development Committee's major objective for 1976 is to work with local leaders, private businesses and governmental agencies at all levels in planning and implementing comprehensive rural development programs. Specifically, the Committee's objectives…

  16. Creating windows of opportunity for policy change: Incorporating evidence into decentralized planning in Kenya.

    PubMed Central

    Ashford, Lori S.; Smith, Rhonda R.; De Souza, Roger-Mark; Fikree, Fariyal F.; Yinger, Nancy V.

    2006-01-01

    PROBLEM: Because researchers and policy-makers work in different spheres, policy decisions in the health arena are often not based on available scientific evidence. APPROACH: We describe a model that illustrates the policy process and how to work strategically to translate knowledge into policy actions. Several types of activity--agenda-setting, coalition building and policy learning--together can create a window of opportunity for policy change. LOCAL SETTING: Activities were undertaken as part of the Kenyan Ministry of Health's new decentralized planning-process. The objective was to ensure that the results of a national assessment of health services were used in the preparation of district-level health plans. RELEVANT CHANGES: Following the intervention, 70 district-level, evidence-based work plans were developed and approved by the Kenyan Ministry of Health. LESSONS LEARNED: Substantial investment and effort are needed to bring stakeholders together to work towards policy change. More in-depth evaluation of these efforts can aid understanding of how systematic approaches to policy change can be replicated elsewhere. PMID:16917657

  17. A preliminary model of work during initial examination and treatment planning appointments.

    PubMed

    Irwin, J Y; Torres-Urquidy, M H; Schleyer, T; Monaco, V

    2009-01-10

    Objective This study's objective was to formally describe the work process for charting and treatment planning in general dental practice to inform the design of a new clinical computing environment.Methods Using a process called contextual inquiry, researchers observed 23 comprehensive examination and treatment planning sessions during 14 visits to 12 general US dental offices. For each visit, field notes were analysed and reformulated as formalised models. Subsequently, each model type was consolidated across all offices and visits. Interruptions to the workflow, called breakdowns, were identified.Results Clinical work during dental examination and treatment planning appointments is a highly collaborative activity involving dentists, hygienists and assistants. Personnel with multiple overlapping roles complete complex multi-step tasks supported by a large and varied collection of equipment, artifacts and technology. Most of the breakdowns were related to technology which interrupted the workflow, caused rework and increased the number of steps in work processes.Conclusion Current dental software could be significantly improved with regard to its support for communication and collaboration, workflow, information design and presentation, information content, and data entry.

  18. Contribution of reactive and proactive control to children's working memory performance: Insight from item recall durations in response sequence planning.

    PubMed

    Chevalier, Nicolas; James, Tiffany D; Wiebe, Sandra A; Nelson, Jennifer Mize; Espy, Kimberly Andrews

    2014-07-01

    The present study addressed whether developmental improvement in working memory span task performance relies upon a growing ability to proactively plan response sequences during childhood. Two hundred thirteen children completed a working memory span task in which they used a touchscreen to reproduce orally presented sequences of animal names. Children were assessed longitudinally at 7 time points between 3 and 10 years of age. Twenty-one young adults also completed the same task. Proactive response sequence planning was assessed by comparing recall durations for the 1st item (preparatory interval) and subsequent items. At preschool age, the preparatory interval was generally shorter than subsequent item recall durations, whereas it was systematically longer during elementary school and in adults. Although children mostly approached the task reactively at preschool, they proactively planned response sequences with increasing efficiency from age 7 on, like adults. These findings clarify the nature of the changes in executive control that support working memory performance with age. (PsycINFO Database Record (c) 2014 APA, all rights reserved).

  19. Improving health sector travel.

    PubMed

    Hurdle, David; Davis, Adrian

    2004-10-01

    Preventing ill health and obesity and building more physical activity into our daily lives have never been so high on the agenda, and the way we travel can help. Many workplaces and schools are drawing up travel plans, with the aims usually to minimise car use and encourage healthier and more environmentally friendly travel. The Transport White Paper of 1998 advocated travel plans and singled out hospitals for action. Travel plans continue to be a focus within the latest Transport White Paper, launched in July 2004. This article covers various prompts to the health sector to implement travel plans. It addresses issues and concerns facing NHS Trusts, the practical things Trusts can do, and the increasing amount of good practice available. Finally, it demonstrates that travel plans can work, and are working, in the health sector.

  20. Contingency Planning for Planetary Rovers

    NASA Technical Reports Server (NTRS)

    Dearden, Richard; Meuleau, Nicolas; Ramakrishnan, Sailesh; Smith, David; Washington, Rich; Clancy, Daniel (Technical Monitor)

    2002-01-01

    There has been considerable work in AI on planning under uncertainty. But this work generally assumes an extremely simple model of action that does not consider continuous time and resources. These assumptions are not reasonable for a Mars rover, which must cope with uncertainty about the duration of tasks, the power required, the data storage necessary, along with its position and orientation. In this paper, we outline an approach to generating contingency plans when the sources of uncertainty involve continuous quantities such as time and resources. The approach involves first constructing a "seed" plan, and then incrementally adding contingent branches to this plan in order to improve utility. The challenge is to figure out the best places to insert contingency branches. This requires an estimate of how much utility could be gained by building a contingent branch at any given place in the seed plan. Computing this utility exactly is intractable, but we outline an approximation method that back propagates utility distributions through a graph structure similar to that of a plan graph.

  1. Incremental Contingency Planning

    NASA Technical Reports Server (NTRS)

    Dearden, Richard; Meuleau, Nicolas; Ramakrishnan, Sailesh; Smith, David E.; Washington, Rich

    2003-01-01

    There has been considerable work in AI on planning under uncertainty. However, this work generally assumes an extremely simple model of action that does not consider continuous time and resources. These assumptions are not reasonable for a Mars rover, which must cope with uncertainty about the duration of tasks, the energy required, the data storage necessary, and its current position and orientation. In this paper, we outline an approach to generating contingency plans when the sources of uncertainty involve continuous quantities such as time and resources. The approach involves first constructing a "seed" plan, and then incrementally adding contingent branches to this plan in order to improve utility. The challenge is to figure out the best places to insert contingency branches. This requires an estimate of how much utility could be gained by building a contingent branch at any given place in the seed plan. Computing this utility exactly is intractable, but we outline an approximation method that back propagates utility distributions through a graph structure similar to that of a plan graph.

  2. A Strategic Plan Is Just the Beginning

    ERIC Educational Resources Information Center

    Wilson, E. B.

    2009-01-01

    The process of strategic planning wears out institutions. Strategic planning, pursued with high purpose and energy, is enervating and exhausting. In this article, the author describes the value-added work of trustees in high-performing boards and discusses the role boards of trustees play as the process of continuous strategic planning unfolds.…

  3. Practical Suggestions for Family Planning Education.

    ERIC Educational Resources Information Center

    Health Services Administration (DHEW/PHS), Rockville, MD. Bureau of Community Health Services.

    This manual is designed to address some of the basic problems of those who work in family planning education, and is based on the recurring questions and concerns of participants in a nationwide series of DHEW-sponsored family planning education and communication workshops. The manual proceeds chronologically, dealing first with the planning of a…

  4. Planning Communities: Citizens in Two Border Towns Learn To Plan Their Own Initiatives.

    ERIC Educational Resources Information Center

    Henkel, David

    1998-01-01

    The University of New Mexico's Community and Regional Planning Program worked with two border towns that share water resources--Columbus (New Mexico) and Puerto Palomas (Chihuahua, Mexico)--to help them prepare a community comprehensive plan needed for water-project funding. The program conducted action research involving local schools and people…

  5. Pass the Chocolate: Planning with Teachers

    ERIC Educational Resources Information Center

    Kimmel, Sue C.

    2013-01-01

    With all the discourse in school librarianship about collaboration, there is surprisingly little discussion of teacher planning. For teachers, planning is the taken-for-granted work necessary for teaching. Planning focuses on various increments of time, ranging from a single lesson to a day, a week, a grading term, and a school year. Teacher…

  6. 30 CFR 77.1500 - Auger mining; planning.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Auger mining; planning. 77.1500 Section 77.1500... § 77.1500 Auger mining; planning. Auger mining shall be planned and conducted by the operator to insure against any hazard to underground workings located at or near such auger operations and all auger holes...

  7. Teacher Pension Choice: Surveying the Landscape in Washington State. Working Paper 81

    ERIC Educational Resources Information Center

    Goldhaber, Dan; Grout, Cyrus; Pennucci, Annie; Bignell, Wesley

    2012-01-01

    In this descriptive paper we detail the structure of two Washington State teacher retirement plans: a traditional defined benefit plan and a hybrid defined benefit-defined contribution plan. We provide preliminary evidence on how retirement plan structures may relate to the choices that teachers make. Our analysis of the financial incentives…

  8. RBS Career Education. Evaluation Planning Manual. Education Is Going to Work.

    ERIC Educational Resources Information Center

    Kershner, Keith M.

    Designed for use with the Research for Better Schools career education program, this evaluation planning manual focuses on procedures and issues central to planning the evaluation of an educational program. Following a statement on the need for evaluation, nine sequential steps for evaluation planning are discussed. The first two steps, program…

  9. 33. PLAN OF DEER ISLAND PUMPING STATION SHOWING EXISTING PUMPING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. PLAN OF DEER ISLAND PUMPING STATION SHOWING EXISTING PUMPING PLAN AND LOCATION OF PROPOSED ADDITIONS, METROPOLITAN WATER AND SEWERAGE BOARD, METROPOLITAN SEWERAGE WORKS, JULY 1908. Aperture card 6417. - Deer Island Pumping Station, Boston, Suffolk County, MA

  10. Restoration Planning | NOAA Gulf Spill Restoration

    Science.gov Websites

    Mexico. Since then, we have worked with the public and BP to identify and implement early restoration restoration plan for the Gulf of Mexico and took public comments on the draft plan through December 4, 2015

  11. Building a vision for the future: strategic planning in a shared governance nursing organization.

    PubMed

    Baker, C; Beglinger, J E; Bowles, K; Brandt, C; Brennan, K M; Engelbaugh, S; Hallock, T; LaHam, M

    2000-06-01

    Today's health care delivery environment is marked by extreme turbulence and ever-increasing complexity. Now, more than ever, an organization's strategic plan must do more than outline a business plan. Rather, the strategic plan is a fundamental tool for building and sustaining an organizational vision for the future. The strong, dynamic strategic plan (1) represents a long-range vision for improving organizational performance, (2) provides a model for planning and implementing structures and processes for the management of outcomes, (3) reflects and shapes the organizational culture and customer focus, (4) provides decision support for difficult operational choices made day to day, and (5) integrates and aligns the work of the organization. This article describes the development, implementation, and evaluation of a methodology for strategic planning within a shared governance nursing organization. Built upon the strategic plan of the hospital, the process undertaken by the nursing organization reflects the following commitments: (1) to develop a strategic plan that is meaningful and part of daily work life at all levels of the nursing organization, (2) to make the plan practical and realistic through incremental building, (3) to locate and articulate accountability for each step, and (4) to build in a process for checking progress toward goal achievement and readjusting the plan as necessary.

  12. Aligning everyday life priorities with people's self-management support networks: an exploration of the work and implementation of a needs-led telephone support system.

    PubMed

    Blickem, Christian; Kennedy, Anne; Jariwala, Praksha; Morris, Rebecca; Bowen, Robert; Vassilev, Ivaylo; Brooks, Helen; Blakeman, Tom; Rogers, Anne

    2014-06-17

    Recent initiatives to target the personal, social and clinical needs of people with long-term health conditions have had limited impact within primary care. Evidence of the importance of social networks to support people with long-term conditions points to the need for self-management approaches which align personal circumstances with valued activities. The Patient-Led Assessment for Network Support (PLANS) intervention is a needs-led assessment for patients to prioritise their health and social needs and provide access to local community services and activities. Exploring the work and practices of patients and telephone workers are important for understanding and evaluating the workability and implementation of new interventions. Qualitative methods (interviews, focus group, observations) were used to explore the experience of PLANS from the perspectives of participants and the telephone support workers who delivered it (as part of an RCT) and the reasons why the intervention worked or not. Normalisation Process Theory (NPT) was used as a sensitising tool to evaluate: the relevance of PLANS to patients (coherence); the processes of engagement (cognitive participation); the work done for PLANS to happen (collective action); the perceived benefits and costs of PLANS (reflexive monitoring). 20 patients in the intervention arm of a clinical trial were interviewed and their telephone support calls were recorded and a focus group with 3 telephone support workers was conducted. Analysis of the interviews, support calls and focus group identified three themes in relation to the delivery and experience of PLANS. These are: formulation of 'health' in the context of everyday life; trajectories and tipping points: disrupting everyday routines; precarious trust in networks. The relevance of these themes are considered using NPT constructs in terms of the work that is entailed in engaging with PLANS, taking action, and who is implicated this process. PLANS gives scope to align long-term condition management to everyday life priorities and valued aspects of life. This approach can improve engagement with health-relevant practices by situating them within everyday contexts. This has potential to increase utilisation of local resources with potential cost-saving benefits for the NHS. ISRCTN45433299.

  13. A knowledge-based approach to automated planning for hepatocellular carcinoma.

    PubMed

    Zhang, Yujie; Li, Tingting; Xiao, Han; Ji, Weixing; Guo, Ming; Zeng, Zhaochong; Zhang, Jianying

    2018-01-01

    To build a knowledge-based model of liver cancer for Auto-Planning, a function in Pinnacle, which is used as an automated inverse intensity modulated radiation therapy (IMRT) planning system. Fifty Tomotherapy patients were enrolled to extract the dose-volume histograms (DVHs) information and construct the protocol for Auto-Planning model. Twenty more patients were chosen additionally to test the model. Manual planning and automatic planning were performed blindly for all twenty test patients with the same machine and treatment planning system. The dose distributions of target and organs at risks (OARs), along with the working time for planning, were evaluated. Statistically significant results showed that automated plans performed better in target conformity index (CI) while mean target dose was 0.5 Gy higher than manual plans. The differences between target homogeneity indexes (HI) of the two methods were not statistically significant. Additionally, the doses of normal liver, left kidney, and small bowel were significantly reduced with automated plan. Particularly, mean dose and V15 of normal liver were 1.4 Gy and 40.5 cc lower with automated plans respectively. Mean doses of left kidney and small bowel were reduced with automated plans by 1.2 Gy and 2.1 Gy respectively. In contrast, working time was also significantly reduced with automated planning. Auto-Planning shows availability and effectiveness in our knowledge-based model for liver cancer. © 2017 The Authors. Journal of Applied Clinical Medical Physics published by Wiley Periodicals, Inc. on behalf of American Association of Physicists in Medicine.

  14. Using multi-disciplinary strategic master facilities planning for organizations experiencing programmatic re-direction

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Heubach, J.G.; Weimer, W.C.; Bruce, W.A.

    Facility master planning is critical to the future productivity of a laboratory and the quality of worklife for the laboratory staff. For organizations undergoing programmatic re-direction, a master facility planning approach linked to the organization`s strategic planning process is even more important. Major changes in an organization such as programmatic re-direction can significantly impact a broad range of variables which exceed the expertise of traditional planning teams, e.g., capacity variability, work team organization, organizational culture, and work process simplification. By expanding the diversity of the participants of the planning team, there is a greater likelihood that a research organization`s scientific,more » organizational, economic, and employees` needs can be meshed in the strategic plan and facility plan. Recent recommendations from facility planners suggest drawing from diverse fields in building multi-disciplinary planning teams: Architecture, engineering, natural science, social psychology, and strategic planning (Gibson,1993). For organizations undergoing significant operational or culture change, the master facility planning team should also include members with expertise in organizational effectiveness, industrial engineering, human resources, and environmental psychology. A recent planning and design project provides an example which illustrates the use of an expanded multi-disciplinary team engaged in planning laboratory renovations for a research organization undergoing programmatic re-direction. The purpose of the proposed poster session is to present a multi-disciplinary master facility planning process linked to an organization`s strategic planning process or organizational strategies.« less

  15. The J-Staff System, Network Synchronisation and Noise

    DTIC Science & Technology

    2014-06-01

    GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S... work . A key challenge of such structures is their tendency to fall into extreme dynamical modes. One is a ‘two-speed’ mode, where units interacting with...longer term planning, led by the J5 Planning Branch, fall into a slow cycle of work , while those entities interacting predominately with operations

  16. Capabilities for Joint Analysis in the Department of Defense: Rethinking Support for Strategic Analysis

    DTIC Science & Technology

    2016-01-01

    activity, completed ana- lytic baselines, current memoranda describing in-progress work , briefings sent to high officials, and published papers by...Is Enough, Santa Monica, Calif.: RAND Corporation , MR-400-RC, 1994. ———, “Report of Working Group: Overall Force Planning Concepts, in Lessons...RAND’s Work on Planning Under Uncertainty for National Security, Santa Monica, Calif.: RAND Corporation , TR-1249-OSD, 2012. As of July 22, 2016: http

  17. The Strategic Planning (SWOT) Analysis Outcomes and Suggestions according to the Students and the Lecturers within the Distance Education System

    ERIC Educational Resources Information Center

    Yelken, Tugba Yanpar; Kilic, Figen; Ozdemir, Caner

    2012-01-01

    In recent years, strategic planning has become one of the subjects that many institutions work on to ensure the institutions' appropriate management based on realistic results. Therefore, this planning has to be taken into account and should provide planning direction on the bases of its results. Basically, the manager of strategic planning,…

  18. Tank waste remediation system configuration management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vann, J.M.

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Projectmore » personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.« less

  19. Status report, The Public Health and Planning 101 project: strengthening collaborations between the public health and planning professions.

    PubMed

    Mahendra, A; Vo, T; Einstoss, C; Weppler, J; Gillen, P; Ryan, L; Haley, K

    2017-01-01

    Land use planning is a complex field comprised of legislation, policies, processes and tools. A growing body of evidence supports the relationship between land use planning decisions, community design and health. The built environment has been shown to be associated with physical inactivity, obesity, cardiovascular disease, respiratory disease and mental illness. Consequently, there is a growing interest within public health to work with planners on land use planning initiatives such as official plans and transportation master plans. Two surveys were developed: one for public health professionals and the other for planning professionals (survey questions available upon request to the corresponding author). The surveys were pilot tested in two separate focus group sessions with public health and planning professionals. Focus group volunteers helped to validate the surveys by verifying survey questions, design and overall flow. In early 2012, 304 public health professionals and 301 planning professionals completed the two separate surveys, comprising the total survey respondents for each respective profession used to calculate proportions. The survey results represent a convenience sample and are not generalizable to the entire population of public health and planning professionals in Ontario. Results compare survey responses from both groups where appropriate. Most respondents worked either as public health staff (78%) or planners/senior planners (58%). A smaller percentage of public health and planning professionals worked either as managers (15% and 11%, respectively) or directors (5% and 9%, respectively). Health is associated with how communities are planned and built, and the services and resources provided within them. Inspired by the results of our survey and based on user feedback from the pilot tests, a free online training program entitled "Public Health and Planning 101: An Online Course for Public Health and Planning Professionals to Create Healthier Built Environments" was launched in 2016 by OPHA as a collaborative project with OPPI and PHAC. This course is designed to bridge the gaps between the two professions, as well as provide greater opportunities for developing collaborative partnerships to help create and foster healthy built environments.

  20. Consultants in nhs scotland: a survey of work commitments, remuneration, job satisfaction and retirement plans.

    PubMed

    French, F H; Andrew, J E; Awramenko, M; Coutts, H; Leighton-Beck, L; Mollison, J; Needham, G; Scott, A; Walker, K A

    2004-05-01

    UK consultants have reported working long hours, increased stress and reduced morale. This study set out to elicit consultants' views on flexible working and to gather data on consultants' workloads, remuneration, job satisfaction and retirement plans. As such it is the first comprehensive study of consultants in NHS Scotland. The Information and Statistics Division of the Scottish Executive Health Dept provided a list of consultants working in NHS Scotland Focus groups and interviews informed the design of a postal self-completion, questionnaire. The response ratewas 61%. Almost two-thirds (65%) of respondents felt their workloads were unreasonable and unsustainable and 67% were unable to provide their desired standards of patient care. Two-thirds (67%) did not normally take meal breaks, 63% had insufficient time for outside interests, whilst 44% felt their health was being adversely affected Many (84%) believed that some of their work could be delegated to someone less qualified but 79% agreed that there were insufficient staff to make this possible. The average planned retirement age was 60 years, with 23% describing their plans as definite and 70% as quite or very likely. When asked what might induce them to postpone retirement, 50% cited reduced workload/work intensity. In 2003, a majority of consultants in the UK voted in favour of the new consultant contract. This will improve consultant pay and introduce a standard 40-hour working week, including worked on-call. This should address tow of the main areas of consultant dissatisfaction in NHS Scotland. However, staff shortages will require to be addressed if the contract is to be successfully implemented.

  1. Tank waste remediation system multi-year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less

  2. Tank waste remediation system multi-year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-09-01

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less

  3. Evaluation of the current landscape of respiratory nurse specialists in the UK: planning for the future needs of patients.

    PubMed

    Yorke, Janelle; Prigmore, Sam; Hodson, Matt; Stonham, Carol; Long, Hannah; Bellhouse, Sarah; Fletcher, Monica; Edwards, Sheila

    2017-01-01

    The National Health Service currently faces significant challenges and must optimise effective workforce planning and management. There are increasing concerns regarding poor workforce planning for respiratory medicine; a greater understanding of the role of respiratory nurse specialists will inform better workforce planning and management. This was a survey study. Two surveys were administered: an organisational-level survey and an individual respiratory nurse survey. There were 148 and 457 respondents to the organisational and individual nurse survey, respectively. Four main themes are presented: (1) breadth of service provided; (2) patient care; (3) work environment; and (4) succession planning. The majority of work conducted by respiratory nurse specialists relates to patient care outside the secondary care setting including supporting self-management in the home, supporting patients on home oxygen, providing hospital-at-home services and facilitating early discharge from acute care environments. Yet, most respiratory nursing teams are employed by secondary care trusts and located within acute environments. There was evidence of multidisciplinary working, although integrated care was not prominent in the free-text responses. High workload was reported with one-quarter of nursing teams short-staffed. Respiratory nurses reported working unpaid extra hours and a lack of administrative support that often took them away from providing direct patient care. Nearly half of the present sample either plan to retire or are eligible for retirement within 10 years. This survey report provides a current snapshot of the respiratory nurse specialist workforce in the UK. This workforce is an ageing population; the results from this survey can be used to inform succession planning and to ensure a viable respiratory nurse specialist workforce in future.

  4. Evaluation of the current landscape of respiratory nurse specialists in the UK: planning for the future needs of patients

    PubMed Central

    Yorke, Janelle; Prigmore, Sam; Hodson, Matt; Stonham, Carol; Long, Hannah; Bellhouse, Sarah; Fletcher, Monica; Edwards, Sheila

    2017-01-01

    Introduction The National Health Service currently faces significant challenges and must optimise effective workforce planning and management. There are increasing concerns regarding poor workforce planning for respiratory medicine; a greater understanding of the role of respiratory nurse specialists will inform better workforce planning and management. Methods This was a survey study. Two surveys were administered: an organisational-level survey and an individual respiratory nurse survey. Results There were 148 and 457 respondents to the organisational and individual nurse survey, respectively. Four main themes are presented: (1) breadth of service provided; (2) patient care; (3) work environment; and (4) succession planning. The majority of work conducted by respiratory nurse specialists relates to patient care outside the secondary care setting including supporting self-management in the home, supporting patients on home oxygen, providing hospital-at-home services and facilitating early discharge from acute care environments. Yet, most respiratory nursing teams are employed by secondary care trusts and located within acute environments. There was evidence of multidisciplinary working, although integrated care was not prominent in the free-text responses. High workload was reported with one-quarter of nursing teams short-staffed. Respiratory nurses reported working unpaid extra hours and a lack of administrative support that often took them away from providing direct patient care. Nearly half of the present sample either plan to retire or are eligible for retirement within 10 years. Conclusions This survey report provides a current snapshot of the respiratory nurse specialist workforce in the UK. This workforce is an ageing population; the results from this survey can be used to inform succession planning and to ensure a viable respiratory nurse specialist workforce in future. PMID:28912954

  5. "If You Don't Do Parking Management .. Forget Your Behaviour Change, It's Not Going to Work.": Health and Transport Practitioner Perspectives on Workplace Active Travel Promotion.

    PubMed

    Petrunoff, Nick; Rissel, Chris; Wen, Li Ming

    2017-01-01

    After having conducted two studies of the effectiveness of workplace travel plans for promoting active travel, we investigated health and transport practitioners' perspectives on implementing workplace travel plans to share some of the lessons learnt. The objectives of this study were to describe perceived elements of effective workplace travel plans, barriers and enablers to workplace travel planning, their experiences of working with the other profession on travel plan implementation, their recommendations for workplace travel planning, and also to explore similarities and differences in transport and health practitioner perspectives. Fourteen health and ten transport practitioners who had prior involvement in workplace travel plan programs were purposefully selected from workplaces in Australia. We conducted 20 in-depth interviews since data saturation had been reached at this point, and data were subject to framework analysis. Perceived essential elements of effective workplace travel plans included parking management; leadership, organisational commitment and governance; skills and other resources like a dedicated travel plan coordinator; and, pre-conditions including supportive transport infrastructure in the surrounds. Recommendations for promoting travel plans included supportive government policy, focusing on business benefits and working at different scales of implementation (e.g. single large worksites and business precincts). Health and transport practitioner perspectives differed, with transport practitioners believing that parking management is the key action for managing travel demand at a worksite. Health practitioners implementing travel plans may require training including concepts of travel demand management, and support from transport planners on parking management strategies. Promoting an understanding of the shared travel behaviour change skills of transport and health practitioners may assist further collaboration. For take-up by organisations to be of sufficient scale to create meaningful population level reductions in driving and increases in active travel, promotion and travel plans should be focused on the priorities of the organisations. Supportive government policy is also required.

  6. “If You Don’t Do Parking Management .. Forget Your Behaviour Change, It’s Not Going to Work.”: Health and Transport Practitioner Perspectives on Workplace Active Travel Promotion

    PubMed Central

    Rissel, Chris; Wen, Li Ming

    2017-01-01

    Objectives After having conducted two studies of the effectiveness of workplace travel plans for promoting active travel, we investigated health and transport practitioners’ perspectives on implementing workplace travel plans to share some of the lessons learnt. The objectives of this study were to describe perceived elements of effective workplace travel plans, barriers and enablers to workplace travel planning, their experiences of working with the other profession on travel plan implementation, their recommendations for workplace travel planning, and also to explore similarities and differences in transport and health practitioner perspectives. Materials and Methods Fourteen health and ten transport practitioners who had prior involvement in workplace travel plan programs were purposefully selected from workplaces in Australia. We conducted 20 in-depth interviews since data saturation had been reached at this point, and data were subject to framework analysis. Results Perceived essential elements of effective workplace travel plans included parking management; leadership, organisational commitment and governance; skills and other resources like a dedicated travel plan coordinator; and, pre-conditions including supportive transport infrastructure in the surrounds. Recommendations for promoting travel plans included supportive government policy, focusing on business benefits and working at different scales of implementation (e.g. single large worksites and business precincts). Health and transport practitioner perspectives differed, with transport practitioners believing that parking management is the key action for managing travel demand at a worksite. Conclusions Health practitioners implementing travel plans may require training including concepts of travel demand management, and support from transport planners on parking management strategies. Promoting an understanding of the shared travel behaviour change skills of transport and health practitioners may assist further collaboration. For take-up by organisations to be of sufficient scale to create meaningful population level reductions in driving and increases in active travel, promotion and travel plans should be focused on the priorities of the organisations. Supportive government policy is also required. PMID:28135301

  7. Micromechanics of composite laminate compression failures

    NASA Technical Reports Server (NTRS)

    Guynn, E. Gail; Bradley, Walter L.

    1988-01-01

    The purpose of this annual progress report is to summarize the work effort and results accomplished from July 1987 through July 1988 on NASA Research Grant NAG1-659 entitled Micromechanics of Composite Laminate Compressive Failure. The report contains: (1) the objective of the proposed research, (2) the summary of accomplishments, (3) a more extensive review of compression literature, (4) the planned material (and corresponding properties) received to date, (5) the results for three possible specimen geometries, experimental procedures planned, and current status of the experiments, and (6) the work planned for the next contract year.

  8. Knowledge co-production and boundary work to promote implementation of conservation plans.

    PubMed

    Nel, Jeanne L; Roux, Dirk J; Driver, Amanda; Hill, Liesl; Maherry, Ashton C; Snaddon, Kate; Petersen, Chantel R; Smith-Adao, Lindie B; Van Deventer, Heidi; Reyers, Belinda

    2016-02-01

    Knowledge co-production and boundary work offer planners a new frame for critically designing a social process that fosters collaborative implementation of resulting plans. Knowledge co-production involves stakeholders from diverse knowledge systems working iteratively toward common vision and action. Boundary work is a means of creating permeable knowledge boundaries that satisfy the needs of multiple social groups while guarding the functional integrity of contributing knowledge systems. Resulting products are boundary objects of mutual interest that maintain coherence across all knowledge boundaries. We examined how knowledge co-production and boundary work can bridge the gap between planning and implementation and promote cross-sectoral cooperation. We applied these concepts to well-established stages in regional conservation planning within a national scale conservation planning project aimed at identifying areas for conserving rivers and wetlands of South Africa and developing an institutional environment for promoting their conservation. Knowledge co-production occurred iteratively over 4 years in interactive stake-holder workshops that included co-development of national freshwater conservation goals and spatial data on freshwater biodiversity and local conservation feasibility; translation of goals into quantitative inputs that were used in Marxan to select draft priority conservation areas; review of draft priority areas; and packaging of resulting map products into an atlas and implementation manual to promote application of the priority area maps in 37 different decision-making contexts. Knowledge co-production stimulated dialogue and negotiation and built capacity for multi-scale implementation beyond the project. The resulting maps and information integrated diverse knowledge types of over 450 stakeholders and represented >1000 years of collective experience. The maps provided a consistent national source of information on priority conservation areas for rivers and wetlands and have been applied in 25 of the 37 use contexts since their launch just over 3 years ago. When framed as a knowledge co-production process supported by boundary work, regional conservation plans can be developed into valuable boundary objects that offer a tangible tool for multi-agency cooperation around conservation. Our work provides practical guidance for promoting uptake of conservation science and contributes to an evidence base on how conservation efforts can be improved. © 2015 Society for Conservation Biology.

  9. 2007 regional planning handbook : a guide to administering overall work programs, regional transportation plans and their funding sources.

    DOT National Transportation Integrated Search

    2007-01-01

    This Handbook describes the respective roles and responsibilities for District Transportation Planners with regional transportation planning duties, and for Transportation Planners within ORIP. The focus is Department interaction with the Metropolita...

  10. US Plans for the JEM-EUSO

    NASA Technical Reports Server (NTRS)

    Adams, James H.

    2007-01-01

    This viewgraph presentation reviews the planned United States work on the Extreme Universe Space Observatory (EUSO.) The EUSO is to be mounted to the JEM (Japanese Experiment Module). The plans areas for US participation are the Optics Investigations, Trigger Design and Event Reconstruction.

  11. EPA Brownfields Area-Wide Planning Recipients Selected for FY13 Grant Funding

    EPA Pesticide Factsheets

    EPA has selected the following entities as Brownfields Area-Wide Planning grant recipients. These recipients will work with their local community members, other stakeholders and project partners to develop an area-wide plan and implementation strategy for

  12. Fluor Hanford (FH) River Corridor Transition Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MCBRIDE, D.J.

    2002-08-28

    This Transition Plan defines the scope and schedule for actions that are critical for a smooth transition of the River Corridor scope of work and to ensure the achievement of transition as planned, with minimal or no impact to ongoing baseline activities.

  13. 24 CFR 570.415 - Community Development Work Study Program.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... and economic development, community planning, and community management. The primary objectives of the... economic development, community planning, and community management, and to provide a cadre of well... economic development, community planning, community management, land use and housing activities. Community...

  14. 34. Photographic copy of architects plan dated October 1919, (original ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    34. Photographic copy of architects plan dated October 1919, (original in possession of Montana State University, Bozeman, Montana.) REVISED PLAN AT 2nd FLOOR MAIN STAIRS - Hardin City Water Works, 101 East Fourth Street, Hardin, Big Horn County, MT

  15. Keeping up appearances: the role of identity concealment in the workplace among adults with degenerative eye conditions and its relationship with wellbeing and career outcomes.

    PubMed

    Spiegel, Tali; De Bel, Vera; Steverink, Nardi

    2016-01-01

    This study aims to describe the interplay between the work trajectories and the passing patterns of individuals with degenerative eye conditions in different phases of their career, as well as the disease progression and the career and well-being outcomes associated with different works and passing trajectories. Qualitative interviews on the topic of work trajectories were conducted with 36 working or retired individuals with degenerative eye conditions. The "bigger picture" method was used to explore passing and concealment behavioral patterns, and their associations with various work trajectories. Five patterns of passing and concealment behavior in the workplace were identified and were linked with various work trajectories among visually impaired study participants: (1) no career adjustments, concealed condition throughout career; (2) revealed condition after adjusting career plans; (3) increasingly open about their condition over the course of their career; (4) engaged in career planning, always open about their condition; and (5) engaged in limited career planning, always open about their condition. Patterns characterized by less planning and more identity concealment were associated with more stress and lower levels of self-acceptance, while patterns characterized by more planning for vision deterioration and less passing behavior were associated with higher levels self-acceptance and fewer obstacles over the course of an individual's career. The study's findings can serve as a guide for health professionals. Many individuals with degenerative eye conditions try to conceal their identity as visually impaired in the professional setting. Different aspects of career outcomes (e.g. age of retirement) and wellbeing outcomes (e.g. self-acceptance and stress) associate with identity concealment patterns of individuals throughout their careers. Identifying concealment patterns will allow health professionals to tackle particular adverse outcomes and challenges associated with these patterns.

  16. For Work-Force Training, a Plan to Give College Credit Where It's Due

    ERIC Educational Resources Information Center

    Sander, Libby

    2008-01-01

    After nearly three years of planning, Ohio's higher-education officials are finalizing an ambitious program to grant college credit for some technical courses offered at the state's adult-education centers. The program, called the Career-Technical Credit Transfer, is the latest in a string of state efforts to more closely link work-force training…

  17. Planning for Workforce Reductions: A Technical Assistance Guide for Employers.

    ERIC Educational Resources Information Center

    Balfe, Kevin

    This guide is designed to help employers plan work force reductions. It emphasizes positive collaboration with workers and the community to find new jobs for workers and maintain morale and productivity in the plant. The guide is divided into five chapters. The first chapter acquaints the reader with some of the benefits of work force reduction…

  18. Partnership Bound: Using MAPS with Transitioning Students and Families from All Backgrounds

    ERIC Educational Resources Information Center

    Haines, Shana J.; Francis, Grace L.; Shepherd, Katharine G.; Ziegler, Meg; Mabika, Goma

    2018-01-01

    The McGill Action Planning System (also referred to as Making Action Plans or MAPS) is a supportive, strengths-based process that enables teams to understand each other and work together to support students in achieving their dreams. This process can work very well with all transitioning students with disabilities and their families, including…

  19. Problem-Solving Strategies for Career Planning.

    ERIC Educational Resources Information Center

    McBryde, Merry J.; Karr-Kidwell, PJ

    The need for new expertise in problem solving in the work setting has emerged as a woman's issue because work outside the home has become a primary means for personal goal attainment for about half the women in the United States and because traditional career patterns and norms are ineffective. Career planning is the process of individual career…

  20. 77 FR 51827 - Agency Information Collection Activities; Submission for OMB Review; Comment Request; Ground...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-27

    ... for OMB Review; Comment Request; Ground Control Plans for Surface Coal Mines and Surface Work Areas of Underground Coal Mines ACTION: Notice. SUMMARY: The Department of Labor (DOL) is submitting the Mine Safety... Control Plans for Surface Coal Mines and Surface Work Areas of Underground Coal Mines,'' to the Office of...

  1. 75 FR 60163 - The Future of Aviation Advisory Committee (FAAC) Aviation Safety Subcommittee; Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-29

    ... evolving transportation needs, challenges, and opportunities of the global economy. The subcommittee will... develop a work plan for future meetings. DATES: The meeting will be held on October 19, 2010, from 9 a.m.... Develop a work plan for the next meeting. Registration The conference room can accommodate up to 30...

  2. The Portfolio Project: A Study of Assessment, Instruction, and Middle School Reform.

    ERIC Educational Resources Information Center

    Underwood, Terry

    This book is a study, in research-based narrative form, of one middle school's implementation of a new portfolio assessment plan in response to statewide policy changes in California. The book highlights the interactions of state, district, and local forces as teachers work to implement a portfolio-assessment plan that collects student work and…

  3. Action Plan for Communicating and Marketing the Work and Family Life Program.

    ERIC Educational Resources Information Center

    West, James S.; Hunady, Ronald J.

    This information packet is designed to help Ohio's high school and middle/junior high school teachers develop a plan to communicate and market the state's work and family life program to various constituencies (students, parents, guidance counselors, school boards, and the general public). Discussed first are the rationale for and intended results…

  4. Course Work and Career Planning for Students with Epilepsy: A Guide for School Counselors.

    ERIC Educational Resources Information Center

    Epilepsy Foundation of America, Landover, MD.

    Intended for secondary school counselors, the pamphlet examines effects of epilepsy on course work and career planning. Briefly covered are the nature of epilepsy, treatment, social impact, and public misunderstanding. Effects on academic achievement are discussed in terms of functional problems related to where the seizure activity is located in…

  5. How Best to Assess Students Taking Work Placements? An Empirical Investigation from Australian Urban and Regional Planning

    ERIC Educational Resources Information Center

    Jackson, John; Jones, Martyn; Steele, Wendy; Coiacetto, Eddo

    2017-01-01

    Work placements (including internships) are common in urban and regional planning education but the relevant literature has largely overlooked their assessment and academic standards. To address this gap, the paper presents a study of this topic undertaken within the Australian context. The research involved systematically scoping the status of…

  6. 7 CFR 1710.209 - Approval requirements for load forecast work plans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...) In addition to the approved load forecast required under §§ 1710.202 and 1710.203, any power supply... that are members of a power supply borrower with a total utility plant of $500 million or more must cooperate in the preparation of and submittal of the load forecast work plan of their power supply borrower...

  7. Students Working Online for Group Projects: A Test of an Extended Theory of Planned Behaviour Model

    ERIC Educational Resources Information Center

    Cheng, Eddie W. L.

    2017-01-01

    This study examined an extended theory of planned behaviour (TPB) model that specified factors affecting students' intentions to collaborate online for group work. Past behaviour, past experience and actual behavioural control were incorporated in the extended TPB model. The mediating roles of attitudes, subjective norms and perceived behavioural…

  8. High severity fire in forests of the southwest: Conservation implications. Progress Report August 2005

    USGS Publications Warehouse

    Haire, Sandra L.

    2006-01-01

    Here, we describe the first stages of our work in mapping burn severity at old and new burns as well as the work we have recently completed at our two field sites. The report is organized under our two main objectives with the purpose of summarizing the steps we have taken in working toward these objectives, as well as changes we have made in methodologies since the original study plan. We present some general observations and plans for the next steps in data analysis and product generation. This report, the study plan, a photograph gallery, slide presentations, and our contact information are available on the project Web site http://www.umass.edu/landeco/research/swfire/swfire.html .

  9. Disaster planning: the basics of creating a burn mass casualty disaster plan for a burn center.

    PubMed

    Kearns, Randy D; Conlon, Kathe M; Valenta, Andrea L; Lord, Graydon C; Cairns, Charles B; Holmes, James H; Johnson, Daryhl D; Matherly, Annette F; Sawyer, Dalton; Skarote, Mary Beth; Siler, Sean M; Helminiak, Radm Clare; Cairns, Bruce A

    2014-01-01

    In 2005, the American Burn Association published burn disaster guidelines. This work recognized that local and state assets are the most important resources in the initial 24- to 48-hour management of a burn disaster. Historical experiences suggest there is ample opportunity to improve local and state preparedness for a major burn disaster. This review will focus on the basics of developing a burn surge disaster plan for a mass casualty event. In the event of a disaster, burn centers must recognize their place in the context of local and state disaster plan activation. Planning for a burn center takes on three forms; institutional/intrafacility, interfacility/intrastate, and interstate/regional. Priorities for a burn disaster plan include: coordination, communication, triage, plan activation (trigger point), surge, and regional capacity. Capacity and capability of the plan should be modeled and exercised to determine limitations and identify breaking points. When there is more than one burn center in a given state or jurisdiction, close coordination and communication between the burn centers are essential for a successful response. Burn surge mass casualty planning at the facility and specialty planning levels, including a state burn surge disaster plan, must have interface points with governmental plans. Local, state, and federal governmental agencies have key roles and responsibilities in a burn mass casualty disaster. This work will include a framework and critical concepts any burn disaster planning effort should consider when developing future plans.

  10. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Barbee, D; McCarthy, A; Galavis, P

    Purpose: Errors found during initial physics plan checks frequently require replanning and reprinting, resulting decreased departmental efficiency. Additionally, errors may be missed during physics checks, resulting in potential treatment errors or interruption. This work presents a process control created using the Eclipse Scripting API (ESAPI) enabling dosimetrists and physicists to detect potential errors in the Eclipse treatment planning system prior to performing any plan approvals or printing. Methods: Potential failure modes for five categories were generated based on available ESAPI (v11) patient object properties: Images, Contours, Plans, Beams, and Dose. An Eclipse script plugin (PlanCheck) was written in C# tomore » check errors most frequently observed clinically in each of the categories. The PlanCheck algorithms were devised to check technical aspects of plans, such as deliverability (e.g. minimum EDW MUs), in addition to ensuring that policy and procedures relating to planning were being followed. The effect on clinical workflow efficiency was measured by tracking the plan document error rate and plan revision/retirement rates in the Aria database over monthly intervals. Results: The number of potential failure modes the PlanCheck script is currently capable of checking for in the following categories: Images (6), Contours (7), Plans (8), Beams (17), and Dose (4). Prior to implementation of the PlanCheck plugin, the observed error rates in errored plan documents and revised/retired plans in the Aria database was 20% and 22%, respectively. Error rates were seen to decrease gradually over time as adoption of the script improved. Conclusion: A process control created using the Eclipse scripting API enabled plan checks to occur within the planning system, resulting in reduction in error rates and improved efficiency. Future work includes: initiating full FMEA for planning workflow, extending categories to include additional checks outside of ESAPI via Aria database queries, and eventual automated plan checks.« less

  11. Care plans and care planning in long-term conditions: a conceptual model.

    PubMed

    Burt, Jenni; Rick, Jo; Blakeman, Thomas; Protheroe, Joanne; Roland, Martin; Bower, Pete

    2014-10-01

    The prevalence and impact of long-term conditions continues to rise. Care planning for people with long-term conditions has been a policy priority for chronic disease management in a number of health-care systems. However, patients and providers appear unclear about the formulation and implementation of care planning. Further work in this area is therefore required to inform the development, implementation and evaluation of future care planning initiatives. We distinguish between 'care planning' (the process by which health-care professionals and patients discuss, agree and review an action plan to achieve the goals or behaviour change of most relevance and concern to the patient) and a 'care plan' (a written document recording the outcome of a care planning process). We propose a typology of care planning and care plans with three core dimensions: perspective (patient or professional), scope (a focus on goals or on behaviours) and networks (confined to the professional-patient dyad or extending to the entire care network). In addition, we draw on psychological models of mediation and moderation to outline potential mechanisms through which care planning and care plans may lead to improved outcomes for both patients and the wider health-care system. The proposed typology of care planning and care plans offered here, along with the model of the process by which care planning may influence outcomes, provide a useful framework for future policy developments and evaluations. Empirical work is required to explore the degree to which current care planning approaches and care plans can be described according to these dimensions, and the factors that determine which types of patients and professionals use which type of care plans.

  12. Popes in the Pizza: Analyzing Activity Reports to Create and Sustain a Strategic Plan

    ERIC Educational Resources Information Center

    Sweet, Charlie; Blythe, Hal; Keeley, E. J.; Forsyth, Ben

    2008-01-01

    This article presents a practical methodology for creating and sustaining strategic planning, the task analysis. Utilizing our Teaching & Learning Center Strategic Plan as a model, we demonstrate how working with a weekly status report provides a comprehensive listing of detail necessary to analyze and revise the plan. The new methodology is…

  13. 75 FR 4528 - Endangered and Threatened Species: Notice of Intent to Prepare a Recovery Plan for Cook Inlet...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-28

    ... recovery of Cook Inlet belugas, which are listed as endangered under the ESA. The recovery planning process... effort to expedite the recovery plan process, NMFS will work towards incorporating relevant portions of... and Threatened Species: Notice of Intent to Prepare a Recovery Plan for Cook Inlet Beluga Whales...

  14. Social Work Discharge Planning in Acute Care Hospitals in Israel: Clients' Evaluation of the Discharge Planning Process and Adequacy

    ERIC Educational Resources Information Center

    Soskolne, Varda; Kaplan, Giora; Ben-Shahar, Ilana; Stanger, Varda; Auslander, Gail. K.

    2010-01-01

    Objective: To examine the associations of patients' characteristics, hospitalization factors, and the patients' or family assessment of the discharge planning process, with their evaluation of adequacy of the discharge plan. Method: A prospective study. Social workers from 11 acute care hospitals in Israel provided data on 1426 discharged…

  15. Validating the Electric Maze Task as a Measure of Planning

    ERIC Educational Resources Information Center

    Sheppard, Kelly W.; Cheatham, Carol L.

    2017-01-01

    The Electric Maze Task (EMT) is a novel planning task designed to allow flexible testing of planning abilities across a broad age range and to incorporate manipulations to test underlying planning abilities, such as working-memory and inhibitory control skills. The EMT was tested in a group of 63 typically developing 7- to 12-year-olds.…

  16. Perspectives and Plans for Graduate Studies. 7. Sociology 1973.

    ERIC Educational Resources Information Center

    Ontario Council on Graduate Studies, Toronto. Advisory Committee on Academic Planning.

    This document reports on a formal planning assessment for sociology conducted by the Advisory Committee on Academic Planning of the Ontario Council on Graduate Studies. Data, reports and comments, and recommendations on a plan for graduate work in sociology in the province is set out. Recommendations are: (1) That the high rates of delay and…

  17. Integration of Hierarchical Goal Network Planning and Autonomous Path Planning

    DTIC Science & Technology

    2016-03-01

    Conference on Robotics and Automation (ICRA); 2010 May 3– 7; Anchorage, AK. p. 2902–2908. 4. Ayan NF, Kuter U, Yaman F, Goldman RP. Hotride...DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution unlimited. 13. SUPPLEMENTARY NOTES 14. ABSTRACT Automated planning has...world robotic systems. This report documents work to integrate a hierarchical goal network planning algorithm with low-level path planning. The system

  18. 76 FR 53941 - Notice of Lodging of a Consent Decree Under the Clean Water Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-30

    ... an SSO elimination plan to eliminate its SSOs. Once EPA and Ohio EPA approve the plans, Euclid will be required to implement the plans. The SSO work must be completed no later than December 31, 2020...

  19. A Library Planning Model--Some Theory and How It Works.

    ERIC Educational Resources Information Center

    Goldberg, Robert L.

    1985-01-01

    The first part of the article describes the theoretical background of a library planning model based on the concept of right brain/left brain activities. The second describes the implementation of a short term planning model based on this theory. (CLB)

  20. 7 CFR 1710.250 - General.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., and retirements. The primary components of the system consist of long-range engineering plans, construction work plans (CWPs), CWP amendments, and special engineering and cost studies. Long range engineering plans identify plant investments required over a period of 10 years or more. CWPs specify and...

  1. 7 CFR 1710.250 - General.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., and retirements. The primary components of the system consist of long-range engineering plans, construction work plans (CWPs), CWP amendments, and special engineering and cost studies. Long range engineering plans identify plant investments required over a period of 10 years or more. CWPs specify and...

  2. 7 CFR 1710.250 - General.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., and retirements. The primary components of the system consist of long-range engineering plans, construction work plans (CWPs), CWP amendments, and special engineering and cost studies. Long range engineering plans identify plant investments required over a period of 10 years or more. CWPs specify and...

  3. 7 CFR 1710.250 - General.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., and retirements. The primary components of the system consist of long-range engineering plans, construction work plans (CWPs), CWP amendments, and special engineering and cost studies. Long range engineering plans identify plant investments required over a period of 10 years or more. CWPs specify and...

  4. Guidance for Preparing a Facility Plan. Revised Edition.

    ERIC Educational Resources Information Center

    Environmental Protection Agency, Washington, DC. Office of Water Programs.

    This document provides information to assist with preparing a preliminary facility plan for construction of municipal sewage treatment works. The text describes the requirements in the applicable laws and regulations and suggests a planning process by which they can be met. (CS)

  5. Lesson plans in surgical training.

    PubMed

    Lester, S E; Robson, A K R

    2007-06-01

    Lesson plans in surgery enable trainers and trainees to agree on goals that balance training needs with service commitments. Lesson plans are individualised to the trainee and encourage ownership of learning. They are based on SMART criteria and therefore have a sound educational footing. Most of the work in creating a lesson plan falls to the trainee. The total time for creation of each plan is approximately 20 min. Our use of lesson plans for surgical training has been met with favourable response from both trainer and trainees.

  6. Critical Drivers for Safety Culture: Examining Department of Energy and U.S. Army Operational Experiences - 12382

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lowes, Elizabeth A.

    2012-07-01

    Evaluating operational incidents can provide a window into the drivers most critical to establishing and maintaining a strong safety culture, thereby minimizing the potential project risk associated with safety incidents. By examining U.S. Department of Energy (DOE) versus U.S. Army drivers in terms of regulatory and contract requirements, programs implemented to address the requirements, and example case studies of operational events, a view of the elements most critical to making a positive influence on safety culture is presented. Four case studies are used in this evaluation; two from DOE and two from U.S. Army experiences. Although the standards guiding operationsmore » at these facilities are different, there are many similarities in the level of hazards, as well as the causes and the potential consequences of the events presented. Two of the incidents examined, one from a DOE operation and the other from a U.S. Army facility, resulted in workers receiving chemical burns. The remaining two incidents are similar in that significant conduct of operations failures occurred resulting in high-level radioactive waste (in the case of the DOE facility) or chemical agent (in the case of the Army facility) being transferred outside of engineering controls. A review of the investigation reports for all four events indicates the primary causes to be failures in work planning leading to ineffective hazard evaluation and control, lack of procedure adherence, and most importantly, lack of management oversight to effectively reinforce expectations for safe work planning and execution. DOE and Army safety programs are similar, and although there are some differences in contractual requirements, the expectations for safe performance are essentially the same. This analysis concludes that instilling a positive safety culture comes down to management leadership and engagement to (1) cultivate an environment that values a questioning attitude and (2) continually reinforce expectations for the appropriate level of rigor in work planning and procedure adherence. A review of the root causes and key contributing causes to the events indicate: - Three of the four root cause analyses cite lack of management engagement (oversight, involvement, ability to recognize issues, etc.) as a root cause to the events. - Two of the four root cause analyses cite work planning failures as a root cause to the events and all cause analyses reflect work planning failures as contributing factors to the events. - All events with the exception of the Tuba City plant shutdown indicate procedure noncompliance as a key contributor; in the case of Tuba City the procedure issues were primarily related to a lack of procedures, or a lack of sufficiently detailed procedures. - All events included discussion or suggestion of a lack of a questioning attitude, either on the part of management/supervision, work planners, or workers. This analysis suggests that the most critical drivers to safety culture are: - Management engagement, - Effective work planning and procedures, and - Procedure adherence with a questioning attitude to ensure procedural problems are identified and fixed. In high-hazard operational environments the importance of robust work planning processes and procedure adherence cannot be overstated. However, having the processes by themselves is not enough. Management must actively engage in expectation setting and ensure work planning that meets expectations for hazard analysis and control, develop a culture that encourages incident reporting and a questioning attitude, and routinely observe work performance to reinforce expectations for adherence to procedures/work control documents. In conclusion, the most critical driver to achieving a workforce culture that supports safe and effective project performance can be summarized as follows: 'Management engagement to continually reinforce expectations for work planning processes and procedure adherence in an environment that cultivates a questioning attitude'. (authors)« less

  7. [FEMALE SURGEONS SHOULD BE AWARE OF THE IMPORTANCE OF A CLEAR VISION FOR THEIR CAREER AND LIFE PLANS TO ACHIEVE THEIR CAREER DEVELOPMENT.: A SURVEY OF 20 FEMALE SURGEONS AT THE DEPARTMENT OF SURGERY AND ONCOLOGY, KYUSHU UNIVERSITY].

    PubMed

    Nagayoshi, Kinuko; Mori, Hitomi; Kameda, Chizu; Nakamura, Katsuya; Ueki, Takashi; Tanaka, Masao

    2015-05-01

    A shortage of surgeons has been a serious problem in recent years. There is an urgent need to utilize female surgeons who tend to resign because of bearing and raising of children. To examine possible measures to deal with the issue, we performed questionnaire survey about work-life balance and career planning on 20 female surgeons in the Department of Surgery and Oncology, Kyushu University. The response rate was 80.0%. In the 16 respondents, seven were unmarried and nine were married. A large fraction of the respondents recognized the importance of work-life-balance. Female surgeons have many difficulties to continue working with good work-life balance; therefore, understanding and cooperation of both their spouses and coworkers is considered to be necessary. Married female surgeons considered that improvement of the working environment and sufficient family support were more important for good work-life balance compared to those who were unmarried. Female surgeons should recognize the importance of improvement of their environment, including the workplace and the family to continue working with good work-life balance in youth and should have the prospects about their career plan of their own.

  8. Useful Measures in the Field of Time and Dimensional Rationalisation of Manual Training Lessons

    ERIC Educational Resources Information Center

    Fosnaric, Samo; Planinsec, Jurij

    2010-01-01

    Schoolwork, especially lessons in manual skills is often associated with various ergonomics stresses. These stresses are the result not only of school obligations but also of the physical working environment and inadequate lesson planning. Much can be done in this field if certain approaches are taken into consideration at the work planning stage.…

  9. Technology Partnership Organization: Quality Work Force Planning in East Texas. Final Report for Project Year 1990-1991.

    ERIC Educational Resources Information Center

    Fabac, John N.

    The Technology Partnership Organization (TPO) is one of 24 Quality Work Force Planning (QWFP) entities in Texas. The TPO met its objectives through a variety of activities, including the following: (1) establishing a QWFP committee for the region; (2) providing an inventory of key regional industries with the greatest job opening potential and…

  10. The Melwood Manual: A Planning and Operations Manual for Horticultural Training and Work Co-op Programs.

    ERIC Educational Resources Information Center

    Melwood Horticultural Training Center, Inc., Upper Marlboro, MD.

    This manual is intended as a resource for anyone involved in planning, developing, and/or operating a horticultural training or work co-op program for the handicapped. Following an introductory chapter, the manual is divided into three parts with the greatest weight given to the second part. Part I elaborates on development of the horticulture…

  11. SRDC Plan of Work: Southern States' Title V Programs, 1978. SRDC Series Publication No. 24.

    ERIC Educational Resources Information Center

    Southern Rural Development Center, State College, MS.

    Moving rural development program and research information to users summarizes the Southern Rural Development Center (SRDC) Plan of Work for 1978. One of 4 regional centers set up by the 1972 Rural Development Act, SRDC coordinates cooperation between research and extension at 28 land-grant institutions in 13 states and Puerto Rico which have rural…

  12. The Relationship between Working Memory Capacity and L2 Oral Performance under Task-Based Careful Online Planning Condition

    ERIC Educational Resources Information Center

    Ahmadian, Mohammad Javad

    2012-01-01

    The study reported in this article aimed to investigate the way working memory capacity (WMC) interacts with careful online planning--a task-based implementation variable--to affect second language (L2) speech production. This issue is important to teachers, because it delves into one of the possible task-based implementation variables and thus…

  13. Planning for Universal Design for Learning in the Early Childhood Inclusion Classroom: A Case Study

    ERIC Educational Resources Information Center

    Stone, Jennifer

    2013-01-01

    The majority of children with exceptionalities aged 3-5 are being served in general education settings. Teachers working in these inclusion classrooms must have the ability and knowledge to work with all students under their care. The purpose of this study was to determine how teachers in early childhood inclusion classrooms plan to incorporate…

  14. "I Am-We Are": Personal and Social Pathways to Further Study, Work and Family Life

    ERIC Educational Resources Information Center

    Bornholt, L. J.; Maras, P. M.; Robinson, R. A.

    2009-01-01

    This project explores the apparent layers in motivation for young people's plans in order to extend Pathways Theory. We bring together personal, relational and group motivation to explain the planned pathways to study, work and family life. Location was an Australian town, close to the national socio-economic average, to control broad social…

  15. 42 CFR 411.161 - Prohibition against taking into account Medicare eligibility or entitlement or differentiating...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... provides. (2) Example— Mr. Smith works for employer A, and he and his wife are covered through employer A's GHP (Plan A). Neither is eligible for Medicare nor has ESRD. Mrs. Smith works for employer B, and is... items and services which Plan B does not cover, such as prescription drugs. If Mrs. Smith obtains a...

  16. Measuring Turbulence Mixing in Indonesian Seas Using Microstructure EM-APEX Floats

    DTIC Science & Technology

    We developed scientific plans for collaborative observational programs with Indonesian,Taiwanese, and Japanese researchers. We worked with Taiwanese...and Japanese researchers to plan and execute turbulence experiments using autonomous platforms in the SCS and Kuroshio Current. Our primary platform...and the Applied Physics Laboratory, University of Washington. We are working closely with Japanese collaborators to develop a turbulence observation

  17. Phonological and Executive Working Memory in L2 Task-Based Speech Planning and Performance

    ERIC Educational Resources Information Center

    Wen, Zhisheng

    2016-01-01

    The present study sets out to explore the distinctive roles played by two working memory (WM) components in various aspects of L2 task-based speech planning and performance. A group of 40 post-intermediate proficiency level Chinese EFL learners took part in the empirical study. Following the tenets and basic principles of the…

  18. SRDC Plan of Work - Southern States' Title V Programs. SRDC Series Publication No. 22, June 1977.

    ERIC Educational Resources Information Center

    Southern Rural Development Center, State College, MS.

    The Southern Rural Development Center's 1977 plan focuses on ways to move rural development program and research information to the users. One of four regional centers set by the 1972 Rural Development Act, the southern center works with research and extension staffs in 27 land-grant institutions in 13 states and Puerto Rico. Its publication…

  19. Report of Advisory Group on Assessing Means for Strengthening the Role of Labor in Education and Work Planning.

    ERIC Educational Resources Information Center

    Northwest Regional Educational Lab., Portland, OR.

    As a part of research designed to determine how labor leaders perceive the current relationship between labor and education and to identify activities that could promote greater collaboration in education and work, an advisory committee composed of labor leaders met to analyze labor's role in planning educational activities. Central issues for the…

  20. Proposal of Constraints Analysis Method Based on Network Model for Task Planning

    NASA Astrophysics Data System (ADS)

    Tomiyama, Tomoe; Sato, Tatsuhiro; Morita, Toyohisa; Sasaki, Toshiro

    Deregulation has been accelerating several activities toward reengineering business processes, such as railway through service and modal shift in logistics. Making those activities successful, business entities have to regulate new business rules or know-how (we call them ‘constraints’). According to the new constraints, they need to manage business resources such as instruments, materials, workers and so on. In this paper, we propose a constraint analysis method to define constraints for task planning of the new business processes. To visualize each constraint's influence on planning, we propose a network model which represents allocation relations between tasks and resources. The network can also represent task ordering relations and resource grouping relations. The proposed method formalizes the way of defining constraints manually as repeatedly checking the network structure and finding conflicts between constraints. Being applied to crew scheduling problems shows that the method can adequately represent and define constraints of some task planning problems with the following fundamental features, (1) specifying work pattern to some resources, (2) restricting the number of resources for some works, (3) requiring multiple resources for some works, (4) prior allocation of some resources to some works and (5) considering the workload balance between resources.

  1. Planning Your Retirement.

    ERIC Educational Resources Information Center

    American Association of Retired Persons, Washington, DC.

    This guidebook on retirement planning helps potential retirees by raising important issues in such areas as changing roles and relationships, health and fitness, meaningful use of time, working options, financial and estate planning, and housing and lifestyle. The first section, on attitude and role adjustments, discusses support systems, changing…

  2. Staying Secure for School Safety

    ERIC Educational Resources Information Center

    Youngkin, Minu

    2012-01-01

    Proper planning and preventive maintenance can increase school security and return on investment. Preventive maintenance begins with planning. Through careful planning, education institutions can determine what is working and if any equipment, hardware or software needs to be replaced or upgraded. When reviewing a school's safety and security…

  3. Planning abilities and chess: a comparison of chess and non-chess players on the Tower of London task.

    PubMed

    Unterrainer, J M; Kaller, C P; Halsband, U; Rahm, B

    2006-08-01

    Playing chess requires problem-solving capacities in order to search through the chess problem space in an effective manner. Chess should thus require planning abilities for calculating many moves ahead. Therefore, we asked whether chess players are better problem solvers than non-chess players in a complex planning task. We compared planning performance between chess ( N=25) and non-chess players ( N=25) using a standard psychometric planning task, the Tower of London (ToL) test. We also assessed fluid intelligence (Raven Test), as well as verbal and visuospatial working memory. As expected, chess players showed better planning performance than non-chess players, an effect most strongly expressed in difficult problems. On the other hand, they showed longer planning and movement execution times, especially for incorrectly solved trials. No differences in fluid intelligence and verbal/visuospatial working memory were found between both groups. These findings indicate that better performance in chess players is associated with disproportionally longer solution times, although it remains to be investigated whether motivational or strategic differences account for this result.

  4. A Fast Goal Recognition Technique Based on Interaction Estimates

    NASA Technical Reports Server (NTRS)

    E-Martin, Yolanda; R-Moreno, Maria D.; Smith, David E.

    2015-01-01

    Goal Recognition is the task of inferring an actor's goals given some or all of the actor's observed actions. There is considerable interest in Goal Recognition for use in intelligent personal assistants, smart environments, intelligent tutoring systems, and monitoring user's needs. In much of this work, the actor's observed actions are compared against a generated library of plans. Recent work by Ramirez and Geffner makes use of AI planning to determine how closely a sequence of observed actions matches plans for each possible goal. For each goal, this is done by comparing the cost of a plan for that goal with the cost of a plan for that goal that includes the observed actions. This approach yields useful rankings, but is impractical for real-time goal recognition in large domains because of the computational expense of constructing plans for each possible goal. In this paper, we introduce an approach that propagates cost and interaction information in a plan graph, and uses this information to estimate goal probabilities. We show that this approach is much faster, but still yields high quality results.

  5. Jack D. Fellows: Congressional Science Fellow

    NASA Astrophysics Data System (ADS)

    Jack D. Fellows has been selected as the 1983-84 AGU Congressional Science Fellow. Last week he began his 1-year stint on Capitol Hill as AGU's seventh Congressional Science Fellow.Fellows received his Ph.D. earlier this year from the civil engineering department at the University of Maryland, College Park. For his dissertation he developed a management system using regional geographic information for hydrologic models. His work applied remote sensing data to the decision-making processes of regional planning organizations concerned with hydrology and natural resource management. The Maryland National Capital Park and Planning Commission has integrated Fellows' work into their programs on water resource and environmental planning; his approach also is being used for forest and water resource planning near Freiburg, Baden-Wurtemberg, West Germany.

  6. Care plans and care planning in long term conditions: a conceptual model

    PubMed Central

    Burt, J; Rick, J; Blakeman, T; Protheroe, J; Roland, M; Bower, P

    2013-01-01

    The prevalence and impact of long term conditions continues to rise. Care planning for people with long term conditions has been a policy priority for chronic disease management in a number of health care systems. However, patients and providers appear unclear about the formulation and implementation of care planning. Further work in this area is therefore required to inform the development, implementation and evaluation of future care planning initiatives. We distinguish between ‘care planning’ (the process by which health care professionals and patients discuss, agree and review an action plan to achieve the goals or behaviour change of most relevance and concern to the patient) and a ‘care plan’ (a written document recording the outcome of a care planning process). We propose a typology of care planning and care plans with three core dimensions: perspective (patient or professional), scope (a focus on goals or on behaviours) and networks (confined to the professional-patient dyad or extending to the entire care network). In addition, we draw on psychological models of mediation and moderation to outline potential mechanisms through which care planning and care plans may lead to improved outcomes for both patients and the wider health care system. The proposed typology of care planning and care plans offered here, along with the model of the process by which care planning may influence outcomes, provide a useful framework for future policy developments and evaluations. Empirical work is required to explore the degree to which current care planning approaches and care plans can be described according to these dimensions, and the factors that determine which types of patients and professionals use which type of care plans. PMID:23883621

  7. Development and Testing of Geo-Processing Models for the Automatic Generation of Remediation Plan and Navigation Data to Use in Industrial Disaster Remediation

    NASA Astrophysics Data System (ADS)

    Lucas, G.; Lénárt, C.; Solymosi, J.

    2015-08-01

    This paper introduces research done on the automatic preparation of remediation plans and navigation data for the precise guidance of heavy machinery in clean-up work after an industrial disaster. The input test data consists of a pollution extent shapefile derived from the processing of hyperspectral aerial survey data from the Kolontár red mud disaster. Three algorithms were developed and the respective scripts were written in Python. The first model aims at drawing a parcel clean-up plan. The model tests four different parcel orientations (0, 90, 45 and 135 degree) and keeps the plan where clean-up parcels are less numerous considering it is an optimal spatial configuration. The second model drifts the clean-up parcel of a work plan both vertically and horizontally following a grid pattern with sampling distance of a fifth of a parcel width and keep the most optimal drifted version; here also with the belief to reduce the final number of parcel features. The last model aims at drawing a navigation line in the middle of each clean-up parcel. The models work efficiently and achieve automatic optimized plan generation (parcels and navigation lines). Applying the first model we demonstrated that depending on the size and geometry of the features of the contaminated area layer, the number of clean-up parcels generated by the model varies in a range of 4% to 38% from plan to plan. Such a significant variation with the resulting feature numbers shows that the optimal orientation identification can result in saving work, time and money in remediation. The various tests demonstrated that the model gains efficiency when 1/ the individual features of contaminated area present a significant orientation with their geometry (features are long), 2/ the size of pollution extent features becomes closer to the size of the parcels (scale effect). The second model shows only 1% difference with the variation of feature number; so this last is less interesting for planning optimization applications. Last model rather simply fulfils the task it was designed for by drawing navigation lines.

  8. Planning for life after orthopaedics.

    PubMed

    Barr, Joseph S; McCaslin, Michael J; Hinds, Cynthia K

    2014-01-01

    The word retirement is going out of fashion. Many orthopaedic surgeons want to work in some capacity when they stop performing surgery. Making a smooth transition from a busy orthopaedic practice to alternative work demands advanced planning. The surgeon must consider personal issues that involve how to use human capital (his or her accumulated knowledge and experience). New ventures, hobbies, travel, and spending time with family and friends are some possibilities. Plans for slowing down or leaving the practice should be discussed and agreed on well ahead of time. Agreements for buyouts may be difficult to work out and will require creative thinking. The solo practitioner can close the practice or hire a successor. Financial planning is perhaps the most important consideration and should be started by approximately age 40. It is recommended that the surgeon develop a portfolio of secure investments and annuities to provide adequate income for as long as is needed and then to turn the residual income to one's family, favorite charities, or other desired cause. A team of competent advisors is needed to help develop and achieve one's goals, create financial security, and provide the discipline to carry out the needed planning for life after orthopaedics.

  9. Field Implementation Plan for the In-Situ Bioremediation Treatability Study at the Technical Area-V Groundwater Area of Concern

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Li, Jun

    This Field Implementation Plan (FIP) was prepared by Sandia National Laboratories, New Mexico (SNL/NM) and provides instruction on conducting a series of in-situ bioremediation (ISB) tests as described in the Revised Treatability Study Work Plan for In-Situ Bioremediation at the Technical Area-V Groundwater Area of Concern, referred to as the Revised Work Plan in this FIP. The Treatability Study is designed to gravity inject an electron-donor substrate and bioaugmentation bacteria into groundwater via three injection wells to perform bioremediation of the constituents of concern (COCs), nitrate and trichloroethene (TCE), in the regions with the highest concentrations at the Technical Area-Vmore » Groundwater (TAVG) Area of Concern (AOC). The Treatability Study will evaluate the effectiveness of bioremediation solution delivery and COC treatment over time. This FIP is designed for SNL/NM work planning and management. It is not intended to be submitted for regulator’s approval. The technical details presented in this FIP are subject to change based on field conditions, availability of equipment and materials, feasibility, and inputs from Sandia personnel and Aboveground Injection System contractor.« less

  10. Strategic planning for clinical services: St. Joseph Hospital and Health Care Center.

    PubMed

    Linggi, A; Pelham, L D

    1986-09-01

    A pharmacy department at a 340-bed community hospital based its strategic plan for developing patient-oriented services on a sound drug distribution system, a credible work-measurement program, and fiscal responsibility. In 1982 the department of pharmacy and i.v. therapy implemented a strategic plan for improving pharmaceutical services. The plan involved developing goals and objectives for the department; marketing the department's services and fiscal management to hospital administrators, medical staff, and nursing staff; building teamwork among the pharmacy staff; and improving the drug distribution system before instituting clinical services. Hiring of additional pharmacy staff was justified on the basis of work-measurement data. By adjusting staffing levels every two weeks based on work-measurement data, the department increased the efficiency of drug distribution activities; the pharmacy also implemented cost-saving programs like selection of therapeutic alternates and formulary restrictions. The savings were then reinvested in labor-intensive patient-oriented pharmaceutical services. A staff development program using staff pharmacists as preceptors expanded the breadth and depth of pharmacists' clinical skills. The planning efforts were successful because the needs of hospital administrators, the pharmacy department, and staff members were addressed.

  11. The 30/20 GHz flight experiment system, phase 2. Volume 4: Experiment system development plan

    NASA Technical Reports Server (NTRS)

    Bronstein, L.; Kawamoto, Y.; Riberich, J. J.; Scope, J. R.; Forman, B. J.; Bergman, S. G.; Reisenfeld, S.

    1981-01-01

    The development plan for the 30/20 GHz flight experiment system is presented. A master program schedule with detailed development plans for each subsystem is planned with careful attention given to how technology items to ensure a minimal risk. The work breakdown structure shows the organization of the program management with detailed task definitions. The ROM costs based on the development plan are also given.

  12. Evaluation of Family Planning Programmes, An Example from Botswana. Research for Action No. 2.

    ERIC Educational Resources Information Center

    Cook, Sheila

    Since 1969 the International Planned Parenthood Federation has worked with the government of Botswana in setting up family planning services. An evaluation of the family planning aspects of the program were carried out. This is a summary of three research studies and some general comments. Included is: (1) an introduction to Botswana and the…

  13. High Skills, High Wages. Washington's Comprehensive Plan for Workforce Training and Education.

    ERIC Educational Resources Information Center

    Washington State Workforce Training and Education Coordinating Board, Olympia.

    This document is the 1996 update to a 1994 Comprehensive Plan for Workforce Training and Education in Washington State. The plan focuses on collective actions that public and private sector partners need to take to have the best work force development system in the nation. The plan details how jobs are increasingly demanding higher-level skills,…

  14. Mixed-Initiative Planning in MAPGEN: Capabilities and Shortcomings

    NASA Technical Reports Server (NTRS)

    Bresina, John L.; Jonsson, Ari K.; Morris, Paul H.; Rajan, Kanna

    2005-01-01

    MAPGEN (Mixed-initiative Activity Plan GENerator) is a mixed-initiative system that employs automated constraint-based planning, scheduling, and temporal reasoning to assist the Mars Exploration Rover mission operations staff in generating the daily activity plans. This paper describes the mixed-initiative capabilities of MAPGEN, identifies shortcomings with the deployed system, and discusses ongoing work to address some of these shortcomings.

  15. The Timmons Savings Plan: A Working Document on a Plan to Encourage Families to Save for College.

    ERIC Educational Resources Information Center

    Tierney, Michael L.

    The Timmons Savings Plan, which encourages families to save toward college costs, is analyzed. This plan allows for periodic (non-tax deductible) contributions to an account administered by the U.S. Department of the Treasury. The amount deposited would be matched by the federal government in exchange for the government's earning the interest on…

  16. Optimization process planning using hybrid genetic algorithm and intelligent search for job shop machining.

    PubMed

    Salehi, Mojtaba; Bahreininejad, Ardeshir

    2011-08-01

    Optimization of process planning is considered as the key technology for computer-aided process planning which is a rather complex and difficult procedure. A good process plan of a part is built up based on two elements: (1) the optimized sequence of the operations of the part; and (2) the optimized selection of the machine, cutting tool and Tool Access Direction (TAD) for each operation. In the present work, the process planning is divided into preliminary planning, and secondary/detailed planning. In the preliminary stage, based on the analysis of order and clustering constraints as a compulsive constraint aggregation in operation sequencing and using an intelligent searching strategy, the feasible sequences are generated. Then, in the detailed planning stage, using the genetic algorithm which prunes the initial feasible sequences, the optimized operation sequence and the optimized selection of the machine, cutting tool and TAD for each operation based on optimization constraints as an additive constraint aggregation are obtained. The main contribution of this work is the optimization of sequence of the operations of the part, and optimization of machine selection, cutting tool and TAD for each operation using the intelligent search and genetic algorithm simultaneously.

  17. Optimization process planning using hybrid genetic algorithm and intelligent search for job shop machining

    PubMed Central

    Salehi, Mojtaba

    2010-01-01

    Optimization of process planning is considered as the key technology for computer-aided process planning which is a rather complex and difficult procedure. A good process plan of a part is built up based on two elements: (1) the optimized sequence of the operations of the part; and (2) the optimized selection of the machine, cutting tool and Tool Access Direction (TAD) for each operation. In the present work, the process planning is divided into preliminary planning, and secondary/detailed planning. In the preliminary stage, based on the analysis of order and clustering constraints as a compulsive constraint aggregation in operation sequencing and using an intelligent searching strategy, the feasible sequences are generated. Then, in the detailed planning stage, using the genetic algorithm which prunes the initial feasible sequences, the optimized operation sequence and the optimized selection of the machine, cutting tool and TAD for each operation based on optimization constraints as an additive constraint aggregation are obtained. The main contribution of this work is the optimization of sequence of the operations of the part, and optimization of machine selection, cutting tool and TAD for each operation using the intelligent search and genetic algorithm simultaneously. PMID:21845020

  18. Planning documents: a business planning strategy.

    PubMed

    Kaehrle, P A

    2000-06-01

    Strategic planning and business plan development are essential nursing management skills in today's competitive, fast paced, continually changing health care environment. Even in times of great uncertainty, nurse managers need to plan and forecast for the future. A well-written business plan allows nurse managers to communicate their expertise and proactively contribute to the programmatic decisions and changes occurring within their patient population or service area. This article presents the use of planning documents as a practical, strategic business planning strategy. Although the model addresses orthopedic services specifically, nurse managers can gain an understanding and working knowledge of planning concepts that can be applied to all patient populations.

  19. The EM SSAB Annual Work Plan Process: Focusing Board Efforts and Resources - 13667

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Young, Ralph

    One of the most daunting tasks for any new member of a local board of the Environmental Management Site Specific Advisory Board (EM SSAB) is to try to understand the scope of the clean-up activities going on at the site. In most cases, there are at least two or three major cleanup activities in progress as well as monitoring of past projects. When planning for future projects is added to the mix, the list of projects can be long. With the clean-up activities involving all major environmental media - air, water, soils, and groundwater, new EM SSAB members can findmore » themselves totally overwhelmed and ineffective. Helping new members get over this initial hurdle is a major objective of EM and all local boards of the EM SSAB. Even as members start to understand the size and scope of the projects at a site, they can still be frustrated at the length of time it takes to see results and get projects completed. Many project and clean-up timelines for most of the sites go beyond 10 years, so it's not unusual for an EM SSAB member to see the completion of only 1 or 2 projects over the course of their 6-year term on the board. This paper explores the annual work planning process of the EM SSAB local boards, one tool that can be used to educate EM SSAB members into seeing the broader picture for the site. EM SSAB local work plans divide the site into projects focused on a specific environmental issue or media such as groundwater and/or waste disposal options. Projects are further broken down into smaller segments by highlighting major milestones. Using these metrics, local boards of the EM SSAB can start to quantify the effectiveness of the project in achieving the ultimate goal of site clean-up. These metrics can also trigger board advice and recommendations for EM. At the beginning of each fiscal year, the EM SSAB work plan provides a road map with quantifiable checkpoints for activities throughout the year. When the work plans are integrated with site-specific, enforceable regulatory milestones, they can provide a comprehensive work plan for not only the board, but also regulators, site contractors, and DOE. Because the work plans are reviewed and approved by DOE, they carry some weight in holding local boards of the EM SSAB accountable. This structure provides the basis for local boards to achieve their primary function, to provide DOE with information, advice, and recommendations concerning issues affecting the EM program at the site. (authors)« less

  20. Multiple-source spatial data fusion and integration research in the region unified planning management information system

    NASA Astrophysics Data System (ADS)

    Liu, Zhijun; Zhang, Liangpei; Liu, Zhenmin; Jiao, Hongbo; Chen, Liqun

    2008-12-01

    In order to manage the internal resources of Gulf of Tonkin and integrate multiple-source spatial data, the establishment of region unified plan management system is needed. The data fusion and the integrated research should be carried on because there are some difficulties in the course of the system's establishment. For example, kinds of planning and the project data format are different, and data criterion is not unified. Besides, the time state property is strong, and spatial reference is inconsistent, etc. In this article the ARCGIS ENGINE is introduced as the developing platform, key technologies are researched, such as multiple-source data transformation and fusion, remote sensing data and DEM fusion and integrated, plan and project data integration, and so on. Practice shows that the system improves the working efficiency of Guangxi Gulf of Tonkin Economic Zone Management Committee significantly and promotes planning construction work of the economic zone remarkably.

  1. [Quality planning of Family Health Units using Quality Function Deployment (QFD)].

    PubMed

    Volpato, Luciana Fernandes; Meneghim, Marcelo de Castro; Pereira, Antonio Carlos; Ambrosano, Gláucia Maria Bovi

    2010-08-01

    Quality is an indispensible requirement in the health field, and its pursuit is necessary in order to meet demands by a population that is aware of its rights, as part of the essence of good work relations, and to decrease technological costs. Quality thus involves all parties to the process (users and professionals), and is no longer merely an attribute of the health service. This study aimed to verify the possibility of quality planning in the Family Health Units, using Quality Function Deployment (QFD). QFD plans quality according to user satisfaction, involving staff professionals and identifying new approaches to improve work processes. Development of the array, called the House of Quality, is this method's most important characteristics. The results show a similarity between the quality demanded by users and the quality planned by professionals. The current study showed that QFD is an efficient tool for quality planning in public health services.

  2. Cache-Aware Asymptotically-Optimal Sampling-Based Motion Planning

    PubMed Central

    Ichnowski, Jeffrey; Prins, Jan F.; Alterovitz, Ron

    2014-01-01

    We present CARRT* (Cache-Aware Rapidly Exploring Random Tree*), an asymptotically optimal sampling-based motion planner that significantly reduces motion planning computation time by effectively utilizing the cache memory hierarchy of modern central processing units (CPUs). CARRT* can account for the CPU’s cache size in a manner that keeps its working dataset in the cache. The motion planner progressively subdivides the robot’s configuration space into smaller regions as the number of configuration samples rises. By focusing configuration exploration in a region for periods of time, nearest neighbor searching is accelerated since the working dataset is small enough to fit in the cache. CARRT* also rewires the motion planning graph in a manner that complements the cache-aware subdivision strategy to more quickly refine the motion planning graph toward optimality. We demonstrate the performance benefit of our cache-aware motion planning approach for scenarios involving a point robot as well as the Rethink Robotics Baxter robot. PMID:25419474

  3. Cache-Aware Asymptotically-Optimal Sampling-Based Motion Planning.

    PubMed

    Ichnowski, Jeffrey; Prins, Jan F; Alterovitz, Ron

    2014-05-01

    We present CARRT* (Cache-Aware Rapidly Exploring Random Tree*), an asymptotically optimal sampling-based motion planner that significantly reduces motion planning computation time by effectively utilizing the cache memory hierarchy of modern central processing units (CPUs). CARRT* can account for the CPU's cache size in a manner that keeps its working dataset in the cache. The motion planner progressively subdivides the robot's configuration space into smaller regions as the number of configuration samples rises. By focusing configuration exploration in a region for periods of time, nearest neighbor searching is accelerated since the working dataset is small enough to fit in the cache. CARRT* also rewires the motion planning graph in a manner that complements the cache-aware subdivision strategy to more quickly refine the motion planning graph toward optimality. We demonstrate the performance benefit of our cache-aware motion planning approach for scenarios involving a point robot as well as the Rethink Robotics Baxter robot.

  4. Software Engineering Improvement Activities/Plan

    NASA Technical Reports Server (NTRS)

    2003-01-01

    bd Systems personnel accomplished the technical responsibilities for this reporting period, as planned. A close working relationship was maintained with personnel of the MSFC Avionics Department Software Group (ED14). Work accomplishments included development, evaluation, and enhancement of a software cost model, performing literature search and evaluation of software tools available for code analysis and requirements analysis, and participating in other relevant software engineering activities. Monthly reports were submitted. This support was provided to the Flight Software Group/ED 1 4 in accomplishing the software engineering improvement engineering activities of the Marshall Space Flight Center (MSFC) Software Engineering Improvement Plan.

  5. Monte Carlo treatment planning with modulated electron radiotherapy: framework development and application

    NASA Astrophysics Data System (ADS)

    Alexander, Andrew William

    Within the field of medical physics, Monte Carlo radiation transport simulations are considered to be the most accurate method for the determination of dose distributions in patients. The McGill Monte Carlo treatment planning system (MMCTP), provides a flexible software environment to integrate Monte Carlo simulations with current and new treatment modalities. A developing treatment modality called energy and intensity modulated electron radiotherapy (MERT) is a promising modality, which has the fundamental capabilities to enhance the dosimetry of superficial targets. An objective of this work is to advance the research and development of MERT with the end goal of clinical use. To this end, we present the MMCTP system with an integrated toolkit for MERT planning and delivery of MERT fields. Delivery is achieved using an automated "few leaf electron collimator" (FLEC) and a controller. Aside from the MERT planning toolkit, the MMCTP system required numerous add-ons to perform the complex task of large-scale autonomous Monte Carlo simulations. The first was a DICOM import filter, followed by the implementation of DOSXYZnrc as a dose calculation engine and by logic methods for submitting and updating the status of Monte Carlo simulations. Within this work we validated the MMCTP system with a head and neck Monte Carlo recalculation study performed by a medical dosimetrist. The impact of MMCTP lies in the fact that it allows for systematic and platform independent large-scale Monte Carlo dose calculations for different treatment sites and treatment modalities. In addition to the MERT planning tools, various optimization algorithms were created external to MMCTP. The algorithms produced MERT treatment plans based on dose volume constraints that employ Monte Carlo pre-generated patient-specific kernels. The Monte Carlo kernels are generated from patient-specific Monte Carlo dose distributions within MMCTP. The structure of the MERT planning toolkit software and optimization algorithms are demonstrated. We investigated the clinical significance of MERT on spinal irradiation, breast boost irradiation, and a head and neck sarcoma cancer site using several parameters to analyze the treatment plans. Finally, we investigated the idea of mixed beam photon and electron treatment planning. Photon optimization treatment planning tools were included within the MERT planning toolkit for the purpose of mixed beam optimization. In conclusion, this thesis work has resulted in the development of an advanced framework for photon and electron Monte Carlo treatment planning studies and the development of an inverse planning system for photon, electron or mixed beam radiotherapy (MBRT). The justification and validation of this work is found within the results of the planning studies, which have demonstrated dosimetric advantages to using MERT or MBRT in comparison to clinical treatment alternatives.

  6. Peer Review Plan for OPPT Work Plan Risk Assessment of 1 - Bromopropane (“1 - BP”)

    EPA Pesticide Factsheets

    This document outlines the peer review plan for a risk assessment which addresses occupational uses of 1-BP in dry-cleaning and foam gluing operations, consumer uses in aerosol solvent cleaners and spray adhesives, and its effects on human health.

  7. Collaborative Strategic Planning in Higher Education

    ERIC Educational Resources Information Center

    Sanaghan, Patrick

    2009-01-01

    This book outlines a simple, five-phase collaborative approach to strategic planning that has worked effectively on many campuses. Specifically, Collaborative Strategic Planning (CSP) refers to the disciplined and thoughtful process of meaningfully engaging relevant stakeholders in creating a shared future vision and goals for their institution.…

  8. Facility Master Plans: An Essential First Step in the Building Development Process.

    ERIC Educational Resources Information Center

    Wickerham, Wendell E.

    2002-01-01

    Discusses the importance of the facility master plan (FMP) in defining project scope and validating or challenging the work of consultants. Offers three case studies illustrating how facility master plans averted problems or led to unanticipated benefits for the colleges involved. (EV)

  9. 40 CFR 52.2352 - Change to approved plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) rule R307-1-8, Asbestos Work Practices, Contractor Certification, AHERA Accreditation and AHERA Implementation, is removed from Utah's approved State Implementation Plan (SIP). This rule language pertains to... plan. (a) Utah Air Conservation Regulation R307-18-1, New Source Performance Standards, is removed from...

  10. University Extension and Urban Planning Programs: An Efficient Partnership.

    ERIC Educational Resources Information Center

    Kotval, Zenia

    2003-01-01

    The Urban Planning Practicum is a capstone course engaging Michigan State students in urban outreach, working with community organizations on neighborhood revitalization. It facilitates the experiential learning needs of urban planning students while assisting Extension staff in capacity building. Faculty-extension agent partnerships make it…

  11. Site support program plan for ICF Kaiser Hanford Company

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dieterle, S.E.

    1996-09-27

    The Fiscal Year (FY) 1997 Inftastructure Program Site Support Program Plan (SSPP) addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition.

  12. 18 CFR 12.23 - Time for filing emergency action plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... might endanger construction workers or otherwise endanger public health or safety, a temporary... REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS AND PROJECT WORKS Emergency Action Plans § 12.23 Time for filing emergency action plan. (a...

  13. The Promise of Collaboration

    ERIC Educational Resources Information Center

    Bauml, Michelle

    2016-01-01

    Whether a teacher loves it or dreads it, lesson planning is a crucial step in the teaching process. Done effectively, collaborative lesson planning--in which teachers work together to design lessons--leads to increased professional learning, higher job satisfaction for teachers, and better lesson plans. The process poses challenges for both…

  14. Automated survey of 8000 plan checks at eight facilities.

    PubMed

    Halabi, Tarek; Lu, Hsiao-Ming; Bernard, Damian A; Chu, James C H; Kirk, Michael C; Hamilton, Russell J; Lei, Yu; Driewer, Joseph

    2016-09-01

    To identify policy and system related weaknesses in treatment planning and plan check work-flows. The authors' web deployed plan check automation solution, PlanCheck, which works with all major planning and record and verify systems (demonstrated here for mosaiq only), allows them to compute violation rates for a large number of plan checks across many facilities without requiring the manual data entry involved with incident filings. Workflows and failure modes are heavily influenced by the type of record and verify system used. Rather than tackle multiple record and verify systems at once, the authors restricted the present survey to mosaiq facilities. Violations were investigated by sending inquiries to physicists running the program. Frequent violations included inadequate tracking in the record and verify system of total and prescription doses. Infrequent violations included incorrect setting of patient orientation in the record and verify system. Peaks in the distribution, over facilities, of violation frequencies pointed to suboptimal policies at some of these facilities. Correspondence with physicists often revealed incomplete knowledge of settings at their facility necessary to perform thorough plan checks. The survey leads to the identification of specific and important policy and system deficiencies that include: suboptimal timing of initial plan checks, lack of communication or agreement on conventions surrounding prescription definitions, and lack of automation in the transfer of some parameters.

  15. Experimental investigation about the effect of non-axisymmetric wake impact on a low speed axial compressor

    NASA Astrophysics Data System (ADS)

    Liu, Jianyong; Lu, Yajun; Li, Zhiping

    2010-05-01

    Non-axisymmetric wake impact experiments were carried out after the best exciting frequency for a low speed axial compressor had been found by axisymmetric wake impact experiments. When the number and circumferential distribution of inlet guide vanes (IGV) are logical the wakes of non-axisymmetric IGVs can exert beneficial unsteady exciting effect on their downstream rotor flow fields and improve the compressor’s performance. In the present paper, four non-axisymmetric wake impact plans were found working better than the axisymmetric wake impact plan. Compared with the base plan, the best non-axisymmetric plan increased the compressor’s peak efficiency, and the total pressure rise by 1.1 and 2%, and enhanced the stall margin by 4.4%. The main reason why non-axisymmetric plans worked better than the axisymmetric plan was explained as the change of the unsteady exciting signal arising from IGV wakes. Besides the high-frequency components, the non-axisymmetric plan generated a beneficial low-frequency square-wave exciting signal and other secondary frequency components. Compared with the axisymmetric plan, multi-frequency exciting wakes arising from the non-axisymmetric plans are easier to get coupling relation with complex vortices such as clearance vortices, passage vortices and shedding vortices.

  16. The need for coherence between waterfowl harvest and habitat management

    USGS Publications Warehouse

    Runge, M.C.; Johnson, F.A.; Anderson, M.G.; Koneff, M.D.; Reed, E.T.; Mott, S.E.

    2006-01-01

    Two of the most significant management efforts affecting waterfowl populations in North America are the North American Waterfowl Management Plan (the Plan) and Federal harvest management programs. Both the Plan and harvest management are continental in scope, involve an extensive group of stakeholders, and rely on adaptive processes of biological planning, implementation, and evaluation. The development of these programs has occurred independently, however, and there has been little explicit recognition that both harvest and habitat effects should be considered for coherent management planning and evaluation. For example, the harvest strategy can affect whether population objectives of the Plan are met, irrespective of the success of the Plan's habitat conservation efforts. Conversely, habitat conservation activities under the Plan can influence harvest potential and, therefore, the amount of hunting opportunity provided. It seems increasingly clear that the Plan's waterfowl population objectives can only be useful for conservation planning and evaluation if they are accompanied by an explicit specification of the harvest strategy and environmental conditions under which they are to be achieved. This clarification also is necessary to ensure that Plan population objectives are not attained solely through the reduction of hunting opportunity. We believe then that it is imperative that these key waterfowl-management programs work to harmonize their objectives. Harvest management programs and the Plan ought to be working toward the same ends, but that is not possible so long as the mutually reinforcing relationship of these programs is obscured by ambiguities in their management objectives.

  17. Quality of Intensity Modulated Radiation Therapy Treatment Plans Using a ⁶⁰Co Magnetic Resonance Image Guidance Radiation Therapy System.

    PubMed

    Wooten, H Omar; Green, Olga; Yang, Min; DeWees, Todd; Kashani, Rojano; Olsen, Jeff; Michalski, Jeff; Yang, Deshan; Tanderup, Kari; Hu, Yanle; Li, H Harold; Mutic, Sasa

    2015-07-15

    This work describes a commercial treatment planning system, its technical features, and its capabilities for creating (60)Co intensity modulated radiation therapy (IMRT) treatment plans for a magnetic resonance image guidance radiation therapy (MR-IGRT) system. The ViewRay treatment planning system (Oakwood Village, OH) was used to create (60)Co IMRT treatment plans for 33 cancer patients with disease in the abdominal, pelvic, thorax, and head and neck regions using physician-specified patient-specific target coverage and organ at risk (OAR) objectives. Backup plans using a third-party linear accelerator (linac)-based planning system were also created. Plans were evaluated by attending physicians and approved for treatment. The (60)Co and linac plans were compared by evaluating conformity numbers (CN) with 100% and 95% of prescription reference doses and heterogeneity indices (HI) for planning target volumes (PTVs) and maximum, mean, and dose-volume histogram (DVH) values for OARs. All (60)Co IMRT plans achieved PTV coverage and OAR sparing that were similar to linac plans. PTV conformity for (60)Co was within <1% and 3% of linac plans for 100% and 95% prescription reference isodoses, respectively, and heterogeneity was on average 4% greater. Comparisons of OAR mean dose showed generally better sparing with linac plans in the low-dose range <20 Gy, but comparable sparing for organs with mean doses >20 Gy. The mean doses for all (60)Co plan OARs were within clinical tolerances. A commercial (60)Co MR-IGRT device can produce highly conformal IMRT treatment plans similar in quality to linac IMRT for a variety of disease sites. Additional work is in progress to evaluate the clinical benefit of other novel features of this MR-IGRT system. Copyright © 2015 Elsevier Inc. All rights reserved.

  18. Hospital nurses' work environment, quality of care provided and career plans.

    PubMed

    Hinno, S; Partanen, P; Vehviläinen-Julkunen, K

    2011-06-01

    In several European countries, the availability of qualified nurses is insufficient to meet current healthcare requirements. Nurses are highly dissatisfied with the rising demands of the healthcare environment and increasingly considering leaving their jobs. The study aims to investigate the relationships between the characteristics of hospital nurses' work environment and the quality of care provided, and furthermore to examine Dutch nurses' career plans. A cross-sectional, questionnaire survey of registered nurses (n = 334) working in the academic and district hospitals was conducted in 2005/2006. Previously validated questionnaires translated into the participants' language were used. Factor and regression analysis were used for data analysis. Overall, nurses rated their work environment rather favourably. Five work environment characteristics were identified: support for professional development, adequate staffing, nursing competence, supportive management and teamwork. Significant relationships were found between nurses' perceptions of their work environment characteristics and quality of care provided and nurses' career plans. When work environment characteristics were evaluated to be better, nurse-assessed quality of care also increased and intentions to leave current job decreased linearly. Study findings suggest that nurses' perceptions of their work environment are important for nurse outcomes in hospital settings. Further research is needed to explore the predictive ability of the work environment for nurse, patient and organizational outcomes in hospitals. © 2011 The Authors. International Nursing Review © 2011 International Council of Nurses.

  19. 15 CFR 990.45 - Administrative record.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... decide to proceed with restoration planning, they must open a publicly available administrative record to... public comments; (2) Any relevant data, investigation reports, scientific studies, work plans, quality...

  20. 15 CFR 990.45 - Administrative record.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... decide to proceed with restoration planning, they must open a publicly available administrative record to... public comments; (2) Any relevant data, investigation reports, scientific studies, work plans, quality...

Top