Sample records for work plan includes

  1. Engineering Task Plan for the Ultrasonic Inspection of Hanford Double Shell Tanks (DST) FY2000

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    JENSEN, C.E.

    2000-01-10

    This document facilitates the ultrasonic examination of Hanford double-shell tanks. Included are a plan for engineering activities (individual responsibilities), plan for performance demonstration testing, and a plan for field activities (tank inspection). Also included are a Statement of Work for contractor performance of the work and a protocol to be followed should tank flaws that exceed the acceptance criteria be discovered.

  2. Work plan for the radiological survey for the David Witherspoon, Incorporated, Landfill-1630 site, Knoxville, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-07-01

    This work plan establishes the methods and requirements for performing a radiological survey at the David Witherspoon, Incorporated, Landfill-1630 Site, Knoxville, Tennessee (DWI 1630 Site) in accordance with requirements under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The radiological survey will identify the radiological contamination level of the equipment and debris stored at the DWI 1630 Site. The data generated from the survey activities will support the decisions for characterization of the equipment/debris and aid in subsequent disposition and waste handling. The survey activities to be performed under this work plan include an equipment radiological survey,more » a walkover survey, and an immunoassay testing for polychlorinated biphenyls (PCBs). This work plan includes a quality assurance (QA)/quality control (QC) project plan, a health and safety (H&S) plan, and a waste management plan.« less

  3. The Technical Work Plan Tracking Tool

    NASA Technical Reports Server (NTRS)

    Chullen, Cinda; Leighton, Adele; Weller, Richard A.; Woodfill, Jared; Parkman, William E.; Ellis, Glenn L.; Wilson, Marilyn M.

    2003-01-01

    The Technical Work Plan Tracking Tool is a web-based application that enables interactive communication and approval of contract requirements that pertain to the administration of the Science, Engineering, Analysis, and Test (SEAT) contract at Johnson Space Center. The implementation of the application has (1) shortened the Technical Work Plan approval process, (2) facilitated writing and documenting requirements in a performance-based environment with associated surveillance plans, (3) simplified the contractor s estimate of the cost for the required work, and (4) allowed for the contractor to document how they plan to accomplish the work. The application is accessible to over 300 designated NASA and contractor employees via two Web sites. For each employee, the application regulates access according to the employee s authority to enter, view, and/or print out diverse information, including reports, work plans, purchase orders, and financial data. Advanced features of this application include on-line approval capability, automatic e-mail notifications requesting review by subsequent approvers, and security inside and outside the firewall.

  4. 23 CFR 420.111 - What are the documentation requirements for use of FHWA planning and research funds?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... and subrecipients in a work program, or other document that describes the work to be accomplished... various combinations, or brought together as a single work program. The expenditure of PL funds for transportation planning outside of metropolitan planning areas under § 420.109(d) may be included in the work...

  5. FY 1987 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less

  6. 40 CFR 35.668 - Award limitation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ASSISTANCE Environmental Program Grants for Tribes Pollution Prevention Grants (section 6605) § 35.668 Award limitation. If the Pollution Prevention Grant funds are included in a Performance Partnership Grant, the Pollution Prevention work plan commitments must be included in the Performance Partnership Grant work plan. ...

  7. Evaluation Planning, Evaluation Management, and Utilization of Evaluation Results within Adult Literacy Campaigns, Programs and Projects (with Implications for Adult Basic Education and Nonformal Education Programs in General). A Working Paper.

    ERIC Educational Resources Information Center

    Bhola, H. S.

    Addressed to professionals involved in program evaluation, this working paper covers various aspects of evaluation planning, including the following: planning as a sociotechnical process, steps in evaluation planning, program planning and implementation versus evaluation planning and implementation, the literacy system and its subsystems, and some…

  8. 33 CFR 276.7 - Procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... will include full description of planned work, plans, sketches, and similar engineering data and... engineering adequacy of the local proposal and its relation to the possible selected Federal Plan and... Engineers—of the Assistant Secretary of the Army (Civil Works) by forwarding a copy of the draft survey...

  9. 33 CFR 276.7 - Procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... will include full description of planned work, plans, sketches, and similar engineering data and... engineering adequacy of the local proposal and its relation to the possible selected Federal Plan and... Engineers—of the Assistant Secretary of the Army (Civil Works) by forwarding a copy of the draft survey...

  10. 33 CFR 276.7 - Procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... will include full description of planned work, plans, sketches, and similar engineering data and... engineering adequacy of the local proposal and its relation to the possible selected Federal Plan and... Engineers—of the Assistant Secretary of the Army (Civil Works) by forwarding a copy of the draft survey...

  11. 33 CFR 276.7 - Procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... will include full description of planned work, plans, sketches, and similar engineering data and... engineering adequacy of the local proposal and its relation to the possible selected Federal Plan and... Engineers—of the Assistant Secretary of the Army (Civil Works) by forwarding a copy of the draft survey...

  12. 33 CFR 276.7 - Procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... will include full description of planned work, plans, sketches, and similar engineering data and... engineering adequacy of the local proposal and its relation to the possible selected Federal Plan and... Engineers—of the Assistant Secretary of the Army (Civil Works) by forwarding a copy of the draft survey...

  13. 24 CFR 968.315 - Comprehensive Plan (including five-year action plan).

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... comprehensive plan including, but not limited to, the physical and management needs assessments, viability...) Physical needs assessment—(i) Requirements. The physical needs assessment identifies all of the work that a... physical needs assessment is completed without regard to the availability of funds, and shall include the...

  14. 24 CFR 968.315 - Comprehensive Plan (including five-year action plan).

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... comprehensive plan including, but not limited to, the physical and management needs assessments, viability...) Physical needs assessment—(i) Requirements. The physical needs assessment identifies all of the work that a... physical needs assessment is completed without regard to the availability of funds, and shall include the...

  15. 24 CFR 968.315 - Comprehensive Plan (including five-year action plan).

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... comprehensive plan including, but not limited to, the physical and management needs assessments, viability...) Physical needs assessment—(i) Requirements. The physical needs assessment identifies all of the work that a... physical needs assessment is completed without regard to the availability of funds, and shall include the...

  16. Individualism-Collectivism: Links to Occupational Plans and Work Values

    ERIC Educational Resources Information Center

    Hartung, Paul J.; Fouad, Nadya A.; Leong, Frederick T. L.; Hardin, Erin E.

    2010-01-01

    Individualism-collectivism (IC) constitutes a cultural variable thought to influence a wide variety of variables including career planning and decision making. To examine this possibility, college students (216 women, 106 men, 64% racial-ethnic minorities) responded to measures of IC, occupational plans, and work values. Multivariate analysis of…

  17. 7 CFR 25.403. - Ongoing 2-year work plan requirement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... the start of the applicable 2-year period. (c) The 2-year work plan must include the following... Federal, State and local governments, non-profit organizations, foundations, private businesses, and any...

  18. Effects of a workplace travel plan intervention encouraging active travel to work: outcomes from a three-year time-series study.

    PubMed

    Petrunoff, N; Wen, L M; Rissel, C

    2016-06-01

    To evaluate the effects of a three-year workplace travel plan intervention on increasing active travel to work. A time-series study with staff was conducted in 2011 (n = 804), 2012 (n = 904), 2013 (n = 872) and 2014 (n = 687). A travel plan was implemented at a large, outer-suburban worksite in Sydney, Australia. Implementation was assessed by reviewing annual reports including travel plan actions and their status. Annual cross-sectional on-line surveys assessed primary outcomes which included change in the proportion of staff travelling to work via active modes. Multivariate logistic regression was used to adjust for confounders. Strategies to encourage active travel were partially implemented. An average survey response rate was 23% (n = 817). The proportion of staff travelling actively to work increased by 4%-6% across intervention years compared to the baseline, and this increase was significant in 2012 (P = 0.04) and 2013 (P = 0.003). Compared to baseline, after adjusting for distances staff lived from work staff had 33% (95% CI 1%-74%) greater odds of travelling to work via active modes in 2012, and 50% (95% CI 15%-96%) greater odds in 2013. There was no evidence of change in physical activity levels. A workplace travel plan which only included strategies to encourage active travel to work achieved small but significant increases in active travel. Workplace travel plans appear to be a promising way to increase active travel to work. Copyright © 2016 The Royal Society for Public Health. All rights reserved.

  19. A Reliability Simulator for Radiation-Hard Microelectronics Development

    DTIC Science & Technology

    1991-07-01

    1 3.0 PHASE II WORK PLANS ................................................................ 2... plan . The correlation experimental details including the devices utilized, the hot-carrier stressing and the wafer-level radiation correlation procedure...channel devices, and a new lifetime extrapolation method is demonstrated for p-channel devices. 3.0 PHASE II WORK PLANS The Phase 1I program consisted of

  20. Education and Training for Work. Volume 1--Planning Programs.

    ERIC Educational Resources Information Center

    Campbell, Clifton P., Ed.

    This book, which is intended for practicing or aspiring instructors, curriculum developers, and others engaged in work force development at the secondary and postsecondary levels, contains eight papers explaining how to plan education and training for work. The following papers are included: "Determining the Market Demand for Skilled Workers"…

  1. Three Year Work Plan (2007--10) of the IUHPE Northern Part of the Western Pacific Region.

    PubMed

    Nakahara, Toshitaka

    2008-09-01

    The article presents the work plan of the Vice President for the Northern Part of the Western Pacific Region of the IUHPE. The highlights of the plan include, firstly, the organization of the First Asia-Pacific Conference on Health Promotion and Health Education, which will take place in July 2009. Secondly, the plan proposes the establishment of a liaison office and an Internet journal to facilitate collaboration among individuals, groups and organizations working in health promotion and education in this culturally and linguistically diverse region.

  2. Psychotherapeutic and work-oriented interventions: employment outcomes among young adults with work disability due to a mental disorder.

    PubMed

    Mattila-Holappa, Pauliina; Joensuu, Matti; Ahola, Kirsi; Koskinen, Aki; Tuisku, Katinka; Ervasti, Jenni; Virtanen, Marianna

    2016-01-01

    We examined the extent to which psychotherapeutic and work-oriented interventions were included in a medical treatment and rehabilitation plan and whether they predicted future employment among young adults with work disability due to a mental disorder. Data were obtained from the treatment and rehabilitation plans of 1163 young adults aged 18‒34 years, who in 2008 were granted fixed-term work disability compensation due to a mental disorder and were followed for 5 years. Forty-six percent had no proposal for psychotherapy or a work-oriented intervention in their treatment and rehabilitation plan, 22 % had a plan for only a psychotherapeutic intervention, 23 % had a plan for only a work-oriented intervention, and 10 % had both types of interventions planned. Having a planned psychotherapeutic intervention (HR = 1.35, 95 % CI 1.07-1.69) and of the work-oriented interventions, planned rehabilitative courses and training (HR = 1.34, 95 % CI 1.03-1.70) predicted quicker entry into competitive employment. Having a plan for both a psychotherapeutic and work-oriented intervention was associated with being employed at the end of the follow-up (OR = 1.77, 95 % CI 1.07-2.95). Young adults with a long-term psychiatric work disability episode rarely have a recorded plan for rehabilitation in their treatment and rehabilitation plan although psychotherapeutic interventions and a combination of a psychotherapeutic and work-oriented intervention might help them gain employment.

  3. Groundwater Interim Measures Work Plan for the Former Chemical Plant

    EPA Pesticide Factsheets

    May 2012 Groundwater IMWP, revised per EPA's approval, focuses on the installation of a groundwater containment system to mitigate groundwater migration from the former plant. A prior 2002 work plan is included in its entirety in Appendix B.

  4. Facility Planning in the Construction Grants Program. Instructor Guide. Working for Clean Water: An Information Program for Advisory Groups.

    ERIC Educational Resources Information Center

    Buskirk, E. Drannon, Jr.; Cole, Charles A.

    Wastewater facility planning is an essential component of the federal construction grants process. Presented in this instructor's guide is a one-hour presentation on facility planning intended for citizen advisory groups. The guide is part of the Working for Clean Water Project, which also includes a supplementary audiovisual presentation.…

  5. A social survey on the noise impact in open-plan working environments in China.

    PubMed

    Zhang, Mei; Kang, Jian; Jiao, Fenglei

    2012-11-01

    The aim of this study is to reveal noise impact in open-plan working environments in China, through a series of questionnaire surveys and acoustic measurements in typical open-plan working environments. It has been found that compared to other physical environmental factors in open-plan working environments, people are much less satisfied with the acoustic environment. The noise impact in the surveyed working environments is rather significant, in terms of sound level inside the office, understanding of colleagues' conversation, and the use of background music such as music players. About 30-50% of the interviewees think that various noise sources inside and outside offices are 'very disturbing' and 'disturbing', and the most annoying sounds include noises from outside, ventilation systems, office equipment, and keyboard typing. Using higher panels to separate work space, or working in enclosed offices, are regarded as effective improvement measures, whereas introducing natural sounds to mask unwanted sounds seems to be not preferable. There are significant correlations between the evaluation of acoustic environment and office symptoms, including hypersensitivity to loud sounds, easily getting tired and depression. There are also significant correlations between evaluation of various acoustics-related factors and certain statements relating to job satisfaction, including sensitivity to noise, as well as whether conversations could be heard by colleagues. Copyright © 2012 Elsevier B.V. All rights reserved.

  6. Contracts and Management Services FY 1996 Site Support Program Plan: WBS 6.10.14. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Knoll, J.M. Jr.

    1995-09-01

    This is the Contracts and Management Services site support program plan for the US DOE Hanford site. The topics addressed in the program plan include a mission statement, program objectives, planning assumptions, program constraints, work breakdown structure, milestone list, milestone description sheets, and activity detail including cost accounting narrative summary, approved funding budget, and activity detailed description.

  7. Planning for Adaptation to Climate Change in the City of Chicago

    NASA Astrophysics Data System (ADS)

    Wuebbles, D. J.; Hayhoe, K.; Coffee, J.; McGraw, J.; Parzen, J.

    2008-12-01

    Under Mayor Richard M. Daley's leadership, the City of Chicago initiated the Chicago Climate Action Plan (CCAP) to better understand local implications of global climate change in both higher and lower emissions scenarios, reduce greenhouse gas emissions, and implement programs to build future climate change resilience. The City approached this work not only as a way to make Chicago more adaptable in the future, but also to improve Chicago's quality of life today. The Chicago Climate Action Plan adopted stresses the importance of both reducing greenhouse gas emissions in Chicago and preparing for climate changes that may be unavoidable. Building off of the City's significant environmental programs and projects, and based on our analyses of the climate effects and impacts that improved the scientific understanding of future climate change impacts on Chicago, the City then developed a set of climate change adaptation strategies, resulting in the City of Chicago Climate Change Adaptation Summary. This document includes prioritization of climate change adaptations based on relative risk as well as framework strategies for those tactics categorized as "must do/early action." In early 2008, The Mayor's Office asked five Commissioners from its Green Steering Committee to chair adaptation work groups including: extreme heat; extreme precipitation; buildings, infrastructure and equipment; ecosystems; and leadership, planning and communications. Working with staff from relevant departments, sister agencies and other stakeholders, these work groups developed 39 basic adaptation work plans, including plans for enhancing the City's existing projects and programs that relate to climate change adaptation. Climate change adaptation work will be on-going in City Departments under the Mayor's Office leadership. The City intends to continually monitor and improve its response to climate change, resulting in an improved quality of life for Chicago residents.

  8. PlanWorks: A Debugging Environment for Constraint Based Planning Systems

    NASA Technical Reports Server (NTRS)

    Daley, Patrick; Frank, Jeremy; Iatauro, Michael; McGann, Conor; Taylor, Will

    2005-01-01

    Numerous planning and scheduling systems employ underlying constraint reasoning systems. Debugging such systems involves the search for errors in model rules, constraint reasoning algorithms, search heuristics, and the problem instance (initial state and goals). In order to effectively find such problems, users must see why each state or action is in a plan by tracking causal chains back to part of the initial problem instance. They must be able to visualize complex relationships among many different entities and distinguish between those entities easily. For example, a variable can be in the scope of several constraints, as well as part of a state or activity in a plan; the activity can arise as a consequence of another activity and a model rule. Finally, they must be able to track each logical inference made during planning. We have developed PlanWorks, a comprehensive system for debugging constraint-based planning and scheduling systems. PlanWorks assumes a strong transaction model of the entire planning process, including adding and removing parts of the constraint network, variable assignment, and constraint propagation. A planner logs all transactions to a relational database that is tailored to support queries for of specialized views to display different forms of data (e.g. constraints, activities, resources, and causal links). PlanWorks was specifically developed for the Extensible Universal Remote Operations Planning Architecture (EUROPA(sub 2)) developed at NASA, but the underlying principles behind PlanWorks make it useful for many constraint-based planning systems. The paper is organized as follows. We first describe some fundamentals of EUROPA(sub 2). We then describe PlanWorks' principal components. We then discuss each component in detail, and then describe inter-component navigation features. We close with a discussion of how PlanWorks is used to find model flaws.

  9. Occupational Training Plans for Disadvantaged and Handicapped Students in Vocational Education. A Manual for Use in Cooperative Work Experience Programs.

    ERIC Educational Resources Information Center

    Eley, Robert K., Ed.

    This manual, developed to provide vocational instructors or coordinators with model training plans to be used to conduct concurrent work and education programs for disadvantaged and handicapped students, has the purposes of: (1) serving as a description of the kinds of content that should be included in a training plan, (2) serving as an example…

  10. "If You Don't Do Parking Management .. Forget Your Behaviour Change, It's Not Going to Work.": Health and Transport Practitioner Perspectives on Workplace Active Travel Promotion.

    PubMed

    Petrunoff, Nick; Rissel, Chris; Wen, Li Ming

    2017-01-01

    After having conducted two studies of the effectiveness of workplace travel plans for promoting active travel, we investigated health and transport practitioners' perspectives on implementing workplace travel plans to share some of the lessons learnt. The objectives of this study were to describe perceived elements of effective workplace travel plans, barriers and enablers to workplace travel planning, their experiences of working with the other profession on travel plan implementation, their recommendations for workplace travel planning, and also to explore similarities and differences in transport and health practitioner perspectives. Fourteen health and ten transport practitioners who had prior involvement in workplace travel plan programs were purposefully selected from workplaces in Australia. We conducted 20 in-depth interviews since data saturation had been reached at this point, and data were subject to framework analysis. Perceived essential elements of effective workplace travel plans included parking management; leadership, organisational commitment and governance; skills and other resources like a dedicated travel plan coordinator; and, pre-conditions including supportive transport infrastructure in the surrounds. Recommendations for promoting travel plans included supportive government policy, focusing on business benefits and working at different scales of implementation (e.g. single large worksites and business precincts). Health and transport practitioner perspectives differed, with transport practitioners believing that parking management is the key action for managing travel demand at a worksite. Health practitioners implementing travel plans may require training including concepts of travel demand management, and support from transport planners on parking management strategies. Promoting an understanding of the shared travel behaviour change skills of transport and health practitioners may assist further collaboration. For take-up by organisations to be of sufficient scale to create meaningful population level reductions in driving and increases in active travel, promotion and travel plans should be focused on the priorities of the organisations. Supportive government policy is also required.

  11. “If You Don’t Do Parking Management .. Forget Your Behaviour Change, It’s Not Going to Work.”: Health and Transport Practitioner Perspectives on Workplace Active Travel Promotion

    PubMed Central

    Rissel, Chris; Wen, Li Ming

    2017-01-01

    Objectives After having conducted two studies of the effectiveness of workplace travel plans for promoting active travel, we investigated health and transport practitioners’ perspectives on implementing workplace travel plans to share some of the lessons learnt. The objectives of this study were to describe perceived elements of effective workplace travel plans, barriers and enablers to workplace travel planning, their experiences of working with the other profession on travel plan implementation, their recommendations for workplace travel planning, and also to explore similarities and differences in transport and health practitioner perspectives. Materials and Methods Fourteen health and ten transport practitioners who had prior involvement in workplace travel plan programs were purposefully selected from workplaces in Australia. We conducted 20 in-depth interviews since data saturation had been reached at this point, and data were subject to framework analysis. Results Perceived essential elements of effective workplace travel plans included parking management; leadership, organisational commitment and governance; skills and other resources like a dedicated travel plan coordinator; and, pre-conditions including supportive transport infrastructure in the surrounds. Recommendations for promoting travel plans included supportive government policy, focusing on business benefits and working at different scales of implementation (e.g. single large worksites and business precincts). Health and transport practitioner perspectives differed, with transport practitioners believing that parking management is the key action for managing travel demand at a worksite. Conclusions Health practitioners implementing travel plans may require training including concepts of travel demand management, and support from transport planners on parking management strategies. Promoting an understanding of the shared travel behaviour change skills of transport and health practitioners may assist further collaboration. For take-up by organisations to be of sufficient scale to create meaningful population level reductions in driving and increases in active travel, promotion and travel plans should be focused on the priorities of the organisations. Supportive government policy is also required. PMID:28135301

  12. B Plant Complex preclosure work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ADLER, J.G.

    1999-02-02

    This preclosure work plan describes the condition of the dangerous waste treatment storage, and/or disposal (TSD) unit after completion of the B Plant Complex decommissioning Transition Phase preclosure activities. This description includes waste characteristics, waste types, locations, and associated hazards. The goal to be met by the Transition Phase preclosure activities is to place the TSD unit into a safe and environmentally secure condition for the long-term Surveillance and Maintenance (S&M) Phase of the facility decommissioning process. This preclosure work plan has been prepared in accordance with Section 8.0 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement)more » (Ecology et al. 1996). The preclosure work plan is one of three critical Transition Phase documents, the other two being: B Plant End Points Document (WHC-SD-WM-TPP-054) and B Plant S&M plan. These documents are prepared by the U.S. Department of Energy, Richland Operations Office (DOE-RL) and its contractors with the involvement of Washington State Department of Ecology (Ecology). The tanks and vessels addressed by this preclosure work plan are limited to those tanks end vessels included on the B Plant Complex Part A, Form 3, Permit Application (DOE/RL-88-21). The criteria for determining which tanks or vessels are in the Part A, Form 3, are discussed in the following. The closure plan for the TSD unit will not be prepared until the Disposition Phase of the facility decommissioning process is initiated, which follows the long-term S&M Phase. Final closure will occur during the Disposition Phase of the facility decommissioning process. The Waste Encapsulation Storage Facility (WESF) is excluded from the scope of this preclosure work plan.« less

  13. Formulation of consumables management models. Development approach for the mission planning processor working model

    NASA Technical Reports Server (NTRS)

    Connelly, L. C.

    1977-01-01

    The mission planning processor is a user oriented tool for consumables management and is part of the total consumables subsystem management concept. The approach to be used in developing a working model of the mission planning processor is documented. The approach includes top-down design, structured programming techniques, and application of NASA approved software development standards. This development approach: (1) promotes cost effective software development, (2) enhances the quality and reliability of the working model, (3) encourages the sharing of the working model through a standard approach, and (4) promotes portability of the working model to other computer systems.

  14. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1989.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration. Division of Fish and Wildlife.

    1988-11-01

    The FY 1989 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1989. The Work Plan focuses on individual Action Items found in the 1987 Program for which Bonneville Power Administration (BPA) has determined that it has authority and responsibility to implement. Each of the entries in the Work Plan includes objectives, background, and progress to date in achieving those objectives, and a summary of plans for implementation in FY 1989. Most Action Items are implemented through one or moremore » BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. The FY 1989 Work Plan emphasizes continuation of 113 projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. BPA also plans to start 20 new projects in FY 1989. The number of ongoing FY 1988 projects to be continued in FY 1989 and the number of new projects planned to start in FY 1989 are based on current (September 7, 1988) procurement expectations. Several projects presently in BPA's procurement process are expected to be contracted by September 30, 1988, the last day of FY 1988. Although these projects have not yet started, they have been listed in the Work Plan as ongoing FY 1988 projects, based on projected start dates in late September 1988. Throughout the Work Plan, those projects with projected start dates in September 1988 have been noted.« less

  15. Family Planning in Five Continents: Africa, America, Asia, Europe, Oceania. December 1976 Update.

    ERIC Educational Resources Information Center

    International Planned Parenthood Federation, London (England).

    This document gives highlights of the family planning situation in many countries of the world. Its purpose is to provide a quick reference source for those who work in family planning. Population statistics are included for five continents and many countries. Data for the continents include population in 1976, projected population in 2000,…

  16. Issues in NASA Program and Project Management: Focus on Project Planning and Scheduling

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1997-01-01

    Topics addressed include: Planning and scheduling training for working project teams at NASA, overview of project planning and scheduling workshops, project planning at NASA, new approaches to systems engineering, software reliability assessment, and software reuse in wind tunnel control systems.

  17. WAG 2 remedial investigation and site investigation site-specific work plan/health and safety checklist for the soil and sediment task. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Holt, V.L.; Burgoa, B.B.

    1993-12-01

    This document is a site-specific work plan/health and safety checklist (WP/HSC) for a task of the Waste Area Grouping 2 Remedial Investigation and Site Investigation (WAG 2 RI&SI). Title 29 CFR Part 1910.120 requires that a health and safety program plan that includes site- and task-specific information be completed to ensure conformance with health- and safety-related requirements. To meet this requirement, the health and safety program plan for each WAG 2 RI&SI field task must include (1) the general health and safety program plan for all WAG 2 RI&SI field activities and (2) a WP/HSC for that particular field task.more » These two components, along with all applicable referenced procedures, must be kept together at the work site and distributed to field personnel as required. The general health and safety program plan is the Health and Safety Plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee (ORNL/ER-169). The WP/HSCs are being issued as supplements to ORNL/ER-169.« less

  18. Final Work Plan: Targeted Investigation at York, Nebraska

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, Lorraine M.

    The targeted investigation at York will be implemented in phases, so that data collected and interpretations developed at each stage of the program can be evaluated to guide subsequent phases most effectively. Section 2 of this Work Plan presents a brief overview of the York site, its geologic and hydrologic setting, and the previous CCC/USDA investigations. Section 3, outlines the proposed technical program for the targeted investigation, and Section 4 describes the investigative methods to be employed. A community relations plan is in Section 5, and Section 6 includes health and safety information. In addition to this site-specific Work Plan,more » the Master Work Plan (Argonne 2002) developed by Argonne for CCC/USDA investigations in Nebraska should be consulted for complete details of the methods and procedures to be used at York.« less

  19. Individual Development Plans as Governance Tools--Changed Governance of Teachers' Work

    ERIC Educational Resources Information Center

    Parding, Karolina; Liljegren, Andreas

    2017-01-01

    Auditing, accountability, and transparency are concepts that greatly impact the working conditions of today's public sector professionals, including teachers. Documentation requirements have been on the increase for some time, which can be seen in the education sector's Individual Development Plans (IDPs), for example. These IDPs are pedagogical…

  20. Systemic Planning: An Annotated Bibliography and Literature Guide. Exchange Bibliography No. 91.

    ERIC Educational Resources Information Center

    Catanese, Anthony James

    Systemic planning is an operational approach to using scientific rigor and qualitative judgment in a complementary manner. It integrates rigorous techniques and methods from systems analysis, cybernetics, decision theory, and work programing. The annotated reference sources in this bibliography include those works that have been most influential…

  1. [Women in informal economy health and work conditions Bogotá. 2007].

    PubMed

    Sotelo-Suárez, Nidia R; Quiroz-Arcentáles, Jorge L; Mahecha-Montilla, Charo P; López-Sánchez, Paola A

    2012-06-01

    To determine work and health conditions of women working in informal economy in Bogotá, as well as to recommend priority action plans for preventing illnesses and accidents related to work and their consequences. Descriptive observational study. This study analyzed information collected by local groups in work-related contexts during 2007 as part of a set of forms of intervention established according to the Plan de Atención Básica (Primary Care Plan). This plan included 3 715 units of informal work from every point of the city. 3 936 women registers in all were analyzed. This study reveals evident precariousness conditions of women in this economic sector. Specifically, there are certain evident conditions that had shown in this study such as low education levels, incomes below the minimum legal standards, high exposure to damaging health work conditions, long work hours, and few hours for leisure and free time. Furthermore, 75 % of women included in this study are female head of household. This condition makes them more vulnerable to a heavier family and social burden. Closer attention to informal economy phenomenon is suggested in order to avoid vulnerable conditions of working women. Besides, it is necessary to improve the articulation between Academy and forms of intervention through public policies for knowing deeply repeated phenomena regarding the population of study. This articulation can be thought for implementing programs designed for improving women's quality of life.

  2. Disaster planning: the basics of creating a burn mass casualty disaster plan for a burn center.

    PubMed

    Kearns, Randy D; Conlon, Kathe M; Valenta, Andrea L; Lord, Graydon C; Cairns, Charles B; Holmes, James H; Johnson, Daryhl D; Matherly, Annette F; Sawyer, Dalton; Skarote, Mary Beth; Siler, Sean M; Helminiak, Radm Clare; Cairns, Bruce A

    2014-01-01

    In 2005, the American Burn Association published burn disaster guidelines. This work recognized that local and state assets are the most important resources in the initial 24- to 48-hour management of a burn disaster. Historical experiences suggest there is ample opportunity to improve local and state preparedness for a major burn disaster. This review will focus on the basics of developing a burn surge disaster plan for a mass casualty event. In the event of a disaster, burn centers must recognize their place in the context of local and state disaster plan activation. Planning for a burn center takes on three forms; institutional/intrafacility, interfacility/intrastate, and interstate/regional. Priorities for a burn disaster plan include: coordination, communication, triage, plan activation (trigger point), surge, and regional capacity. Capacity and capability of the plan should be modeled and exercised to determine limitations and identify breaking points. When there is more than one burn center in a given state or jurisdiction, close coordination and communication between the burn centers are essential for a successful response. Burn surge mass casualty planning at the facility and specialty planning levels, including a state burn surge disaster plan, must have interface points with governmental plans. Local, state, and federal governmental agencies have key roles and responsibilities in a burn mass casualty disaster. This work will include a framework and critical concepts any burn disaster planning effort should consider when developing future plans.

  3. Human-Automation Integration: Principle and Method for Design and Evaluation

    NASA Technical Reports Server (NTRS)

    Billman, Dorrit; Feary, Michael

    2012-01-01

    Future space missions will increasingly depend on integration of complex engineered systems with their human operators. It is important to ensure that the systems that are designed and developed do a good job of supporting the needs of the work domain. Our research investigates methods for needs analysis. We included analysis of work products (plans for regulation of the space station) as well as work processes (tasks using current software), in a case study of Attitude Determination and Control Officers (ADCO) planning work. This allows comparing how well different designs match the structure of the work to be supported. Redesigned planning software that better matches the structure of work was developed and experimentally assessed. The new prototype enabled substantially faster and more accurate performance in plan revision tasks. This success suggests the approach to needs assessment and use in design and evaluation is promising, and merits investigatation in future research.

  4. Chemical release and radiation effects experiment advanced planning and coordination

    NASA Technical Reports Server (NTRS)

    Vaughan, William W.; Alzmann, Melanie

    1991-01-01

    The efforts conducted to provide assessments and planning support for the Chemical Release and Radiation Effects Satellite (CRRES) Experiments are summarized. Included are activities regarding scientific working group and workshop development including the preparation of descriptive information on the CRRES Project.

  5. Chemical release and radiation effects experiment advanced planned

    NASA Technical Reports Server (NTRS)

    Vaughan, William W.; Alzmann, Melanie

    1990-01-01

    A summary of the efforts conducted to provide assessments and planning support for the Chemical Release and Radiation Experiment Satellite (CRRES) is reported. Included are activities regarding scientific working group and workshop development including the preparation of descriptive information on the CRRES project.

  6. Automated survey of 8000 plan checks at eight facilities.

    PubMed

    Halabi, Tarek; Lu, Hsiao-Ming; Bernard, Damian A; Chu, James C H; Kirk, Michael C; Hamilton, Russell J; Lei, Yu; Driewer, Joseph

    2016-09-01

    To identify policy and system related weaknesses in treatment planning and plan check work-flows. The authors' web deployed plan check automation solution, PlanCheck, which works with all major planning and record and verify systems (demonstrated here for mosaiq only), allows them to compute violation rates for a large number of plan checks across many facilities without requiring the manual data entry involved with incident filings. Workflows and failure modes are heavily influenced by the type of record and verify system used. Rather than tackle multiple record and verify systems at once, the authors restricted the present survey to mosaiq facilities. Violations were investigated by sending inquiries to physicists running the program. Frequent violations included inadequate tracking in the record and verify system of total and prescription doses. Infrequent violations included incorrect setting of patient orientation in the record and verify system. Peaks in the distribution, over facilities, of violation frequencies pointed to suboptimal policies at some of these facilities. Correspondence with physicists often revealed incomplete knowledge of settings at their facility necessary to perform thorough plan checks. The survey leads to the identification of specific and important policy and system deficiencies that include: suboptimal timing of initial plan checks, lack of communication or agreement on conventions surrounding prescription definitions, and lack of automation in the transfer of some parameters.

  7. Progress in Decommissioning the Humboldt Bay Power Plant - 13604

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rod, Kerry; Shelanskey, Steven K.; Kristofzski, John

    Decommissioning of the Pacific Gas and Electric (PG and E) Company Humboldt Bay Power Plant (HBPP) Unit 3 nuclear facility has now, after more than three decades of SAFSTOR and initial decommissioning work, transitioned to full-scale decommissioning. Decommissioning activities to date have been well orchestrated and executed in spite of an extremely small work site with space constricted even more by other concurrent on-site major construction projects including the demolition of four fossil units, construction of a new generating station and 60 KV switchyard upgrade. Full-scale decommissioning activities - now transitioning from Plant Systems Removal (PG and E self-perform) tomore » Civil Works Projects (contractor performed) - are proceeding in a safe, timely, and cost effective manner. As a result of the successful decommissioning work to date (approximately fifty percent completed) and the intense planning and preparations for the remaining work, there is a high level of confidence for completion of all HBPP Unit 3 decommissions activities in 2018. Strategic planning and preparations to transition into full-scale decommissioning was carried out in 2008 by a small, highly focused project team. This planning was conducted concurrent with other critical planning requirements such as the loading of spent nuclear fuel into dry storage at the Independent Spent Fuel Storage Installation (ISFSI) finishing December 2008. Over the past four years, 2009 through 2012, the majority of decommissioning work has been installation of site infrastructure and removal of systems and components, known as the Plant System Removal Phase, where work scope was dynamic with significant uncertainty, and it was self-performed by PG and E. As HBPP Decommissioning transitions from the Plant System Removal Phase to the Civil Works Projects Phase, where work scope is well defined, a contracting plan similar to that used for Fossil Decommissioning will be implemented. Award of five major work scopes in various stages of development are planned as they include: Turbine Building Demolition, Nuclear Facilities Demolition and Excavation, Intake and Discharge Canal Remediation, Office Facility Demobilization, and Final Site Restoration. Benefits realized by transitioning to the Civil Works Projects Phase with predominant firm fixed-price/fixed unit price contracting include single civil works contractor who can coordinate concrete shaving, liner removal, structural removal, and other demolition activities; streamline financial control; reduce PG and E overhead staffing; and provide a specialized Bidder Team with experience from other similar projects. (authors)« less

  8. Work Plan of APEID for the Fifth Programming Cycle, 1992-1996. A Report of the APEID Programme Development Meeting (Chiang Mai, Thailand, August 28-31, 1990).

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific, and Cultural Organization, Bangkok (Thailand). Regional Office for Education in Asia and the Pacific.

    This document is a work plan for the UNESCO Asia and the Pacific Programme of Educational Innovation for Development (APEID) for the period 1992 through 1996. The plan provides a general framework for APEID, including a formulation of annual schedules of activities with due regard to available resources and funding. The document discusses three…

  9. Educational Reform and the World of Work: Italy

    ERIC Educational Resources Information Center

    von Blumenthal, Viktor

    1977-01-01

    One of a four-issue series on educational reform and the world of work in Europe, this issue discusses educational planning and secondary school reform in Italy. Topics discussed include planning and research in vocational-technical education, and the relation between acquisition of specific skills and scientific and technical progress. (Author/DB)

  10. How Home Health Nurses Plan Their Work Schedules: A Qualitative Descriptive Study.

    PubMed

    Irani, Elliane; Hirschman, Karen B; Cacchione, Pamela Z; Bowles, Kathryn H

    2018-06-12

    To describe how home health nurses plan their daily work schedules and what challenges they face during the planning process. Home health nurses are viewed as independent providers and value the nature of their work because of the flexibility and autonomy they hold in developing their work schedules. However, there is limited empirical evidence about how home health nurses plan their work schedules, including the factors they consider during the process and the challenges they face within the dynamic home health setting. Qualitative descriptive design. Semi-structured interviews were conducted with 20 registered nurses who had greater than 2 years of experience in home health and were employed by one of the three participating home health agencies in the mid-Atlantic region of the United States. Data were analyzed using conventional content analysis. Four themes emerged about planning work schedules and daily itineraries: identifying patient needs to prioritize visits accordingly, partnering with patients to accommodate their preferences, coordinating visit timing with other providers to avoid overwhelming patients, and working within agency standards to meet productivity requirements. Scheduling challenges included readjusting the schedule based on patient needs and staffing availability, anticipating longer visits, and maintaining continuity of care with patients. Home health nurses make autonomous decisions regarding their work schedules while considering specific patient and agency factors, and overcome challenges related to the unpredictable nature of providing care in a home health setting. Future research is needed to further explore nurse productivity in home health and improve home health work environments. Home health nurses plan their work schedules to provide high quality care that is patient-centered and timely. The findings also highlight organizational priorities to facilitate continuity of care and support nurses while alleviating the burnout associated with high productivity requirements. This article is protected by copyright. All rights reserved. This article is protected by copyright. All rights reserved.

  11. Automated Procurement System (APS): Project management plan (DS-03), version 1.2

    NASA Technical Reports Server (NTRS)

    Murphy, Diane R.

    1994-01-01

    The National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC) is implementing an Automated Procurement System (APS) to streamline its business activities that are used to procure goods and services. This Project Management Plan (PMP) is the governing document throughout the implementation process and is identified as the APS Project Management Plan (DS-03). At this point in time, the project plan includes the schedules and tasks necessary to proceed through implementation. Since the basis of APS is an existing COTS system, the implementation process is revised from the standard SDLC. The purpose of the PMP is to provide the framework for the implementation process. It discusses the roles and responsibilities of the NASA project staff, the functions to be performed by the APS Development Contractor (PAI), and the support required of the NASA computer support contractor (CSC). To be successful, these three organizations must work together as a team, working towards the goals established in this Project Plan. The Project Plan includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

  12. Customizing for clients: developing a library liaison program from need to plan.

    PubMed

    Tennant, M R; Butson, L C; Rezeau, M E; Tucker, P J; Boyle, M E; Clayton, G

    2001-01-01

    Building on the experiences of librarian representatives to curriculum committees in the colleges of dentistry, medicine, and nursing, the Health Science Center Libraries (HSCL) Strategic Plan recommended the formation of a Library Liaison Work Group to create a formal Library Liaison Program to serve the six Health Science Center (HSC) colleges and several affiliated centers and institutes. The work group's charge was to define the purpose and scope of the program, identify models of best practice, and recommend activities for liaisons. The work group gathered background information, performed an environmental scan, and developed a philosophy statement, a program of liaison activities focusing on seven primary areas, and a forum for liaison communication. Hallmarks of the plan included intensive subject specialization (beyond collection development), extensive communication with users, and personal information services. Specialization was expected to promote competence, communication, confidence, comfort, and customization. Development of the program required close coordination with other strategic plan implementation teams, including teams for collection development, education, and marketing. This paper discusses the HSCL's planning process and the resulting Library Liaison Program. Although focusing on an academic health center, the planning process and liaison model may be applied to any library serving diverse, subject-specific user populations.

  13. Customizing for clients: developing a library liaison program from need to plan*

    PubMed Central

    Tennant, Michele R.; Butson, Linda C.; Rezeau, Michelle E.; Tucker, Prudence J.; Boyle, Marian E.; Clayton, Greg

    2001-01-01

    Building on the experiences of librarian representatives to curriculum committees in the colleges of dentistry, medicine, and nursing, the Health Science Center Libraries (HSCL) Strategic Plan recommended the formation of a Library Liaison Work Group to create a formal Library Liaison Program to serve the six Health Science Center (HSC) colleges and several affiliated centers and institutes. The work group's charge was to define the purpose and scope of the program, identify models of best practice, and recommend activities for liaisons. The work group gathered background information, performed an environmental scan, and developed a philosophy statement, a program of liaison activities focusing on seven |primary areas, and a forum for liaison communication. Hallmarks of the plan included intensive subject specialization (beyond collection development), extensive communication with users, and personal information services. Specialization was expected to promote competence, communication, confidence, comfort, and customization. Development of the program required close coordination with other strategic plan implementation teams, including teams for collection development, education, and marketing. This paper discusses the HSCL's planning process and the resulting Library Liaison Program. Although focusing on an academic health center, the planning process and liaison model may be applied to any library serving diverse, subject-specific user populations. PMID:11209807

  14. Defense Commissary Resale Stock Fund Financial Statements For FY 1992

    DTIC Science & Technology

    1993-06-30

    present DeCA’s accounting procedures during FY 1992. We understand DeCA is aggressively working to improve its financial management system. However...the year ended September 30, 1992, we considered the related internal control structure. The purpose of the planning work was to determine the...auditing procedures we would apply for the purposes of expressing our opinion on the Financial Statements. Planning work included obtaining an

  15. The Implications of Service-Learning for Technology Studies.

    ERIC Educational Resources Information Center

    Folkestad, James E.; Senior, Bolivar A.; DeMirana, Michael A.

    2002-01-01

    A "toys for tots" service-learning experience integrated into an industrial technology management course required development and planning using a process planning and costing model and work with a variety of stakeholders including an Even-Start learning center. Challenges include the lack of service-learning precedent in technology studies and…

  16. How Best to Assess Students Taking Work Placements? An Empirical Investigation from Australian Urban and Regional Planning

    ERIC Educational Resources Information Center

    Jackson, John; Jones, Martyn; Steele, Wendy; Coiacetto, Eddo

    2017-01-01

    Work placements (including internships) are common in urban and regional planning education but the relevant literature has largely overlooked their assessment and academic standards. To address this gap, the paper presents a study of this topic undertaken within the Australian context. The research involved systematically scoping the status of…

  17. An Update on the VAMOS Extremes Working Group Activities

    NASA Technical Reports Server (NTRS)

    Schubert, Siegfried; Cavalcanti, Iracema

    2011-01-01

    We review here the progress of the Variability of the American MOnsoon Systems (VAMOS) extremes working group since it was formed in February of 2010. The goals of the working group are to 1) develop an atlas of warm-season extremes over the Americas, 2) evaluate existing and planned simulations, and 3) suggest new model runs to address mechanisms and predictability of extremes. Substantial progress has been made in the development of an extremes atlas based on gridded observations and several reanalysis products including Modern Era Retrospective-Analysis for Research and Applications (MERRA) and Climate Forecast System Reanalysis (CFSR). The status of the atlas, remaining issues and plans for its expansion to include model data will be discussed. This includes the possibility of adding a companion atlas based on station observations based on the software developed under the World Climate Research Programme (WCRP) Expert Team on Climate Change. Detection and Indices (ETCCDI) activity. We will also review progress on relevant research and plans for the use and validation of the atlas results.

  18. Contingency plan implementation.

    PubMed

    Neurath, D; Cober, N; Owens, W; Giulivi, A

    2012-06-01

    Although the National blood system in Canada reduces the risk of inventory shortages the possibility of a blood supply shortage still exists. The Ontario Ministry of Health and Long-Term Care developed a provincial plan to manage blood transfusion needs and inventory in the event of a National blood shortage. The Ontario plan was developed to align with the National plan as well as other provincial plans in order to ensure consistency in blood management strategies across the country. The Ontario plan was released in 2008, along with a toolkit to aid hospitals in developing their facility specific plans. In the Champlain region of Ontario, a group of 16 hospitals worked collaboratively to develop a regional blood shortage plan. A provincial blood shortage simulation exercise was held in 2010 to test out these plans. The Director of Transfusion Medicine of the largest facility in the group of 16 hospitals (The Ottawa Hospital) took the lead in the development of the regional blood shortage management plan. Working groups from all 16 sites contributed to the plan development. The proposed plan was presented to the Medical Advisory Committee for approval. The plan consists of activities relating to the severity of the supply shortage as defined by Amber, Red, Recovery and Green phases. The plan includes a communication plan for notifying stakeholders including patients whose treatment may be affected. Inventory management and triage guidelines are provided to reduce the demand for blood and to conserve inventory for those patients whose need is prioritized as highest. The regional blood shortage management plan was tested successfully during the provincial simulation exercise. Where regional hospitals work together to provide healthcare, it is beneficial to develop a standardized plan to provide guidance to hospital personnel in response to a blood supply shortage. A consistent plan will ensure patient care is provided in a consistent manner across a health region. Mock or simulation exercises can aid in testing plans and raising the awareness of stakeholders. Copyright © 2012 Elsevier Ltd. All rights reserved.

  19. 24 CFR 968.315 - Comprehensive Plan (including five-year action plan).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... for the development, except for emergencies and essential non-routine maintenance necessary to... undertaken by the PHA in major work categories (e.g., kitchens, electrical systems, etc.); establishing...

  20. Remedial Investigation Work Plan for Upper East Fork Poplar Creek Operable Unit 3 at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-08-01

    Upper East Fork Popular Creek Operable Unit 3 (UEFPC OU 3) is a source term OU composed of seven sites, and is located in the western portion of the Y-12 Plant. For the most part, the UEFPC OU 3 sites served unrelated purposes and are geographically removed from one another. The seven sites include the following: Building 81-10, the S-2 Site, Salvage Yard oil storage tanks, the Salvage Yard oil/solvent drum storage area, Tank Site 2063-U, the Salvage Yard drum deheader, and the Salvage Yard scrap metal storage area. All of these sites are contaminated with at least one ormore » more hazardous and/or radioactive chemicals. All sites have had some previous investigation under the Y-12 Plant RCRA Program. The work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to each OU 3 site. The potential for release of contaminants to receptors through various media is addressed, and a sampling and analysis plan is presented to obtain objectives for the remedial investigation. Proposed sampling activities are contingent upon the screening level risk assessment, which includes shallow soil sampling, soil borings, monitoring well installation, groundwater sampling, and surface water sampling. Data from the site characterization activities will be used to meet the above objectives. A Field Sampling Investigation Plan, Health and Safety Plan, and Waste Management Plan are also included in this work plan.« less

  1. Career Planning Support System Program (CPSS). Final Report.

    ERIC Educational Resources Information Center

    Ohio State Univ., Columbus. National Center for Research in Vocational Education.

    Intended for the developmental practitioner, this report examines literature produced by the Career Planning Support System dealing with career guidance in four major areas: minority youth; women; transition from school to work; and program planning and evaluation. The area of minority youth includes a review of literature on: educational and…

  2. 40 CFR 35.2023 - Water quality management planning.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... to the States to carry out water quality management planning including but not limited to: (1... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality...

  3. 40 CFR 35.2023 - Water quality management planning.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality... to the States to carry out water quality management planning including but not limited to: (1...

  4. 40 CFR 35.2023 - Water quality management planning.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality... to the States to carry out water quality management planning including but not limited to: (1...

  5. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2102 Water quality... Administrator shall first determine that the project is: (a) Included in any water quality management plan being...

  6. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2102 Water quality... Administrator shall first determine that the project is: (a) Included in any water quality management plan being...

  7. 40 CFR 35.2023 - Water quality management planning.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Water quality management planning. 35... to the States to carry out water quality management planning including but not limited to: (1...

  8. Technology Partnership Organization: Quality Work Force Planning in East Texas. Final Report for Project Year 1990-1991.

    ERIC Educational Resources Information Center

    Fabac, John N.

    The Technology Partnership Organization (TPO) is one of 24 Quality Work Force Planning (QWFP) entities in Texas. The TPO met its objectives through a variety of activities, including the following: (1) establishing a QWFP committee for the region; (2) providing an inventory of key regional industries with the greatest job opening potential and…

  9. 49 CFR 268.15 - Form and contents of applications for preconstruction planning assistance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... have Maglev projects are invited to submit applications in Phase I of the Maglev Deployment Program..., including but not necessarily limited to: (1) Preconstruction planning work as is needed to develop a Maglev... made a definitive choice of the particular Maglev technology proposed to be included, a description of...

  10. 49 CFR 268.15 - Form and contents of applications for preconstruction planning assistance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... have Maglev projects are invited to submit applications in Phase I of the Maglev Deployment Program..., including but not necessarily limited to: (1) Preconstruction planning work as is needed to develop a Maglev... made a definitive choice of the particular Maglev technology proposed to be included, a description of...

  11. 49 CFR 268.15 - Form and contents of applications for preconstruction planning assistance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... have Maglev projects are invited to submit applications in Phase I of the Maglev Deployment Program..., including but not necessarily limited to: (1) Preconstruction planning work as is needed to develop a Maglev... made a definitive choice of the particular Maglev technology proposed to be included, a description of...

  12. 49 CFR 268.15 - Form and contents of applications for preconstruction planning assistance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... have Maglev projects are invited to submit applications in Phase I of the Maglev Deployment Program..., including but not necessarily limited to: (1) Preconstruction planning work as is needed to develop a Maglev... made a definitive choice of the particular Maglev technology proposed to be included, a description of...

  13. 49 CFR 268.15 - Form and contents of applications for preconstruction planning assistance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... have Maglev projects are invited to submit applications in Phase I of the Maglev Deployment Program..., including but not necessarily limited to: (1) Preconstruction planning work as is needed to develop a Maglev... made a definitive choice of the particular Maglev technology proposed to be included, a description of...

  14. Eastern Washington Intermodal Transportation Study Scope of Work

    DOT National Transportation Integrated Search

    1993-02-04

    This document presents a detailed Scope of Work to guide implementation of : the Eastern Washington Intermodal Transportation Study. Included is a : description of project management and staff responsibilities, a detailed work : plan and timetable fo...

  15. Evaluation of Family Planning Programmes, An Example from Botswana. Research for Action No. 2.

    ERIC Educational Resources Information Center

    Cook, Sheila

    Since 1969 the International Planned Parenthood Federation has worked with the government of Botswana in setting up family planning services. An evaluation of the family planning aspects of the program were carried out. This is a summary of three research studies and some general comments. Included is: (1) an introduction to Botswana and the…

  16. Writing a group practice business plan.

    PubMed

    Reiboldt, J M

    1999-07-01

    A business plan offers group practices a blueprint to accomplish a variety of goals, such as securing capital, marketing the practice's services, recruiting new employees, developing a strategic plan or a budget, or planning for growth. A business plan should be informative, specific, and visionary. Elements that every business plan should address are a mission statement, strategy, planning, management information, and action scheme. A business plan should include certain information in a prescribed order. By writing a realistic business plan, group practices can work more efficiently and minimize the risk of not meeting their financial projections.

  17. Focus on motivation in the work rehabilitation planning process: a qualitative study from the employer's perspective.

    PubMed

    Gard, Gunvor; Larsson, Agneta

    2003-09-01

    Since the working environment act was passed in 1991, employers in Sweden are to plan and control the working environment conditions in workplaces. They are responsible for organized rehabilitation at the workplace including the development of rehabilitation plans and a plan for interventions in order for a sick-listed client to be able to return to work. The aim of this study was to describe employers' experiences of how motivation can be improved in a work rehabilitation process. Qualitative interviews were performed with 10 employers who had employees that had taken part in a period of vocational rehabilitation at a rehabilitation center in the north of Sweden, over a 2-year period. The result showed that increased focus on motivation for change is needed in work rehabilitation. The clients' motivation for change could be improved by a focus on motivational conversations at the workplace aiming at motivation for change in their working and living conditions. The employers' power of initiative, competence, economic resources, and motivation are needed for creative solutions at the workplace.

  18. FY 1986 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less

  19. Social Work Assessment Notes: A Comprehensive Outcomes-Based Hospice Documentation System.

    PubMed

    Hansen, Angela Gregory; Martin, Ellen; Jones, Barbara L; Pomeroy, Elizabeth C

    2015-08-01

    This article describes the development of an integrated psychosocial patient and caregiver assessment and plan of care for hospice social work documentation. A team of hospice social workers developed the Social Work Assessment Notes as a quality improvement project in collaboration with the information technology department. Using the Social Work Assessment Tool as an organizing framework, this comprehensive hospice social work documentation system is designed to integrate assessment, planning, and outcomes measurement. The system was developed to guide the assessment of patients' and caregivers' needs related to end-of-life psychosocial issues, to facilitate collaborative care plan development, and to measure patient- and family-centered outcomes. Goals established with the patient and the caregiver are documented in the plan of care and become the foundation for patient-centered, strengths-based interventions. Likert scales are used to assign numerical severity levels for identified issues and progress made toward goals and to track the outcome of social work interventions across nine psychosocial constructs. The documentation system was developed for use in an electronic health record but can be used for paper charting. Future plans include automated aggregate outcomes measurement to identify the most effective interventions and best practices in end-of-life care.

  20. Addressing the primary care workforce: a study of nurse practitioner students' plans after graduation.

    PubMed

    Budd, Geraldine M; Wolf, Andrea; Haas, Richard Eric

    2015-03-01

    Primary care is a growing area, and nurse practitioners (NPs) hold promise for meeting the need for additional providers. This article reports on the future plans of more than 300 primary care NP students in family, adult, and adult gerontology programs. The sample was obtained through NP faculty, and data were collected via an online survey. Results indicated that although these students chose primary care, only 48% anticipated working in primary care; 26% planned to practice in rural areas, and 16% planned to work in an inner city. Reasons cited as important for pursuing a primary care position included the long-term patient relationship, faculty and preceptor mentors from the NP program, and clinical experiences as a student. Implications include providing more intensive faculty mentoring to increase the number of individuals seeking primary care positions after graduation and help with future career planning to meet personal career and nursing profession needs. Copyright 2015, SLACK Incorporated.

  1. Planning for College Success

    ERIC Educational Resources Information Center

    PEPNet, 2009

    2009-01-01

    "Planning for College Success" (PCS) is a curriculum model designed by Sharon Downs, M.S., for a course intended to assist deaf and hard of hearing students during their initial introduction to college life. This program allows students to work one-on-one with a counselor to plan for their college success. The program includes short-term goals and…

  2. 40 CFR 35.6010 - Indian Tribe and intertribal consortium eligibility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Hazardous Substances Pollution Contingency Plan (the National Contingency Plan or NCP), except that Indian... jurisdiction is not needed for the Tribe to carry out the support agency activities of the work plan. (b... substantially the same as a State, the subpart O definition of “State” does not include Indian Tribes because...

  3. Transition Planning Guide: From School to Adult Life.

    ERIC Educational Resources Information Center

    Thompson, Sandra Jespersen

    The guide is intended to assist disabled students, their families, and professionals working with them to become familiar with the variety of adult services available and to create a systematic plan for transition from school to adult life. The first section considers the logistics of transition planning and includes a description of the planning…

  4. 76 FR 17419 - Federal Health IT Strategic Plan: 2011-2015 Open Comment Period

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-29

    ... consultation with other appropriate Federal agencies and in collaboration with private and public entities. Work on the five-year Plan began more than a year ago and has included collaboration across federal...

  5. WORKSHOP ON ORGANIZATION AND OPERATION OF COOPERATIVE WORK EXPERIENCE PROGRAMS IN TRADE AND INDUSTRIAL EDUCATION. (TUSKEGEE INSTITUTE, AUGUST 14-SEPTEMBER 1, 1967). FINAL REPORT.

    ERIC Educational Resources Information Center

    HARRIS, JAMES N.; SHERARD, AUSTELL O.

    THIRTY-NINE TRADE AND INDUSTRIAL AND VOCATIONAL TECHNICAL TEACHERS AND SUPERVISORS FROM 19 STATES PARTICIPATED IN A WORKSHOP TO PLAN AND EXECUTE A COMPREHENSIVE EXAMINATION AND EVALUATION OF THE COOPERATIVE WORK EXPERIENCE PLAN OF EDUCATION RELATIVE TO TRADE AND INDUSTRIAL EDUCATION. THE WORKSHOP ORGANIZATION INCLUDED CONSULTANT PRESENTATIONS,…

  6. In the United States, a Mother's Plans for Infant Feeding Are Associated with Her Plans for Employment.

    PubMed

    Mirkovic, Kelsey R; Perrine, Cria G; Scanlon, Kelley S; Grummer-Strawn, Laurence M

    2014-08-01

    The American Academy of Pediatrics recommends 6 months of exclusive breastfeeding, however, only 16% of US infants meet this recommendation. Shorter exclusive/predominant breastfeeding durations have been observed from women who return to work early and/or full-time. We assessed the relationship between prenatal plans for maternity leave duration and return to full-time/part-time status and plans for exclusive breastfeeding. This study included 2348 prenatally employed women from the Infant Feeding Practices Study II (2005-2007) who planned to return to work in the first year postpartum. Bivariate analysis and logistic regression were used to describe the association of maternity leave duration and return status with plans for infant feeding. Overall, 59.5% of mothers planned to exclusively breastfeed in the first few weeks. Mothers planning to return to work within 6 weeks had 0.60 times the odds (95% confidence interval [CI], 0.46-0.77) and mothers planning to return between 7 and 12 weeks had 0.72 times the odds (95% CI, 0.56-0.92) of planning to exclusively breastfeed compared with mothers who were planning to return after 12 weeks. Prenatal plans to return full-time (≥ 30 hours/week vs part-time) were also associated with lower odds of planning to exclusively breastfeed (adjusted odds ratio = 0.61; 95% CI, 0.51-0.77). Mothers planning to return to work before 12 weeks and/or full-time were less likely to plan to exclusively breastfeed. Longer maternity leave and/or part-time return schedules may increase the proportion of mothers who plan to exclusively breastfeed. © International Lactation Consultant Association 2014.

  7. The IAU Division A Working Group on the Third Realization of the ICRF: Background, Goals, Plans

    NASA Astrophysics Data System (ADS)

    Gaume, Ralph

    2015-08-01

    The XXVIII General Assembly of the IAU (Beijing, 2012) established the Division A Working Group on the Third Realization of the International Celestial Reference Frame (ICRF). The adopted charter of the ICRF3 Working Group includes a commitment to report on the implementation and execution plans for ICRF3 during the XXIX General Assembly of the IAU along with a targeted completion and presentation of ICRF3 in 2018 to the XXX General Assembly for adoption. This talk will discuss the background, purpose, and overall implementation plan for ICRF3, and motivate the concept, currently under consideration by the ICRF3 Working Group, that future realizations of the ICRF be based on multi-frequency astrometric data, starting with ICRF3.

  8. Multicultural Group Work: A Force for Developing and Healing

    ERIC Educational Resources Information Center

    Anderson, Donald

    2007-01-01

    Multicultural group work represents a powerful tool for helping and healing in the context of human diversity. This article summarizes multicultural group work, including task, psychoeducational, counseling, and psychotherapy groups, and describes a group work model for multicultural assessment, diagnosis, and treatment planning. Group work…

  9. 40 CFR 35.2104 - Funding and other considerations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... maintenance of the treatment works throughout the applicant's jurisdiction including the ability to comply... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2104 Funding and other... in connection with facilities planning or design work on a wastewater treatment works project. (4...

  10. 40 CFR 35.2104 - Funding and other considerations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2104 Funding and other... maintenance of the treatment works throughout the applicant's jurisdiction including the ability to comply... in connection with facilities planning or design work on a wastewater treatment works project. (4...

  11. Nursery management [Chapter 16

    Treesearch

    Kim M. Wilkinson

    2009-01-01

    This handbook provides an overview of the factors that go into starting and operating a native plant nursery. Management includes all aspects of working with plants in all their phases of growth as described in Chapter 3, Crop Planning and Developing Propagation Protocols. Management also includes working with the community; organizing materials and infrastructure;...

  12. Child Care and Development Fund: Report of State Plans FY 2002-2003.

    ERIC Educational Resources Information Center

    Administration on Children, Youth, and Families (DHHS), Washington, DC. Child Care Bureau.

    The Personal Responsibility and Work Opportunity Reconciliation Act requires each state to submit a biennial plan to implement the Child Care and Development Fund (CCDF). This report summarizes information in the biennial plans submitted for the period October 1, 2001 to September 30, 2003. The analysis includes information from 50 states, the…

  13. Federal Student Aid (FSA) Five-Year Strategic Plan. FY 2004-2008

    ERIC Educational Resources Information Center

    US Department of Education, 2004

    2004-01-01

    The FSA Five-Year Strategic Plan is a roadmap for FY 2004-2008 that identifies five long-range strategic objectives, tactical short-term goals, and performance management initiatives. In working toward the goals outlined in the plan, FSA will address a number of key challenges, including legacy system migration, business process re-engineering,…

  14. PLANNING FOR SAFETY ON THE JOBSITE. SAFETY IN INDUSTRY--CONSTRUCTION INDUSTRY SERIES.

    ERIC Educational Resources Information Center

    OTTO, FRANCIS L.; VAN ATTA, F.A.

    WORK INJURIES AND THEIR MONETARY LOSSES IN THE CONSTRUCTION INDUSTRY CAN BE EFFECTIVELY PREVENTED ONLY THROUGH AN AGGRESSIVE AND WELL-PLANNED SAFETY EFFORT. THIS BULLETIN DISCUSSES THE "HOW" OF PLANNING FOR SAFETY ON THE JOBSITE. IT WAS PREPARED IN THE DIVISION OF PROGRAMING AND RESEARCH, OFFICE OF OCCUPATIONAL SAFETY. CONTENTS INCLUDE (1) THE…

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Barbee, D; McCarthy, A; Galavis, P

    Purpose: Errors found during initial physics plan checks frequently require replanning and reprinting, resulting decreased departmental efficiency. Additionally, errors may be missed during physics checks, resulting in potential treatment errors or interruption. This work presents a process control created using the Eclipse Scripting API (ESAPI) enabling dosimetrists and physicists to detect potential errors in the Eclipse treatment planning system prior to performing any plan approvals or printing. Methods: Potential failure modes for five categories were generated based on available ESAPI (v11) patient object properties: Images, Contours, Plans, Beams, and Dose. An Eclipse script plugin (PlanCheck) was written in C# tomore » check errors most frequently observed clinically in each of the categories. The PlanCheck algorithms were devised to check technical aspects of plans, such as deliverability (e.g. minimum EDW MUs), in addition to ensuring that policy and procedures relating to planning were being followed. The effect on clinical workflow efficiency was measured by tracking the plan document error rate and plan revision/retirement rates in the Aria database over monthly intervals. Results: The number of potential failure modes the PlanCheck script is currently capable of checking for in the following categories: Images (6), Contours (7), Plans (8), Beams (17), and Dose (4). Prior to implementation of the PlanCheck plugin, the observed error rates in errored plan documents and revised/retired plans in the Aria database was 20% and 22%, respectively. Error rates were seen to decrease gradually over time as adoption of the script improved. Conclusion: A process control created using the Eclipse scripting API enabled plan checks to occur within the planning system, resulting in reduction in error rates and improved efficiency. Future work includes: initiating full FMEA for planning workflow, extending categories to include additional checks outside of ESAPI via Aria database queries, and eventual automated plan checks.« less

  16. Sector activities and lessons learned around initial implementation of the United States national physical activity plan.

    PubMed

    Evenson, Kelly R; Satinsky, Sara B

    2014-08-01

    National plans are increasingly common but infrequently evaluated. The 2010 United States National Physical Activity Plan (NPAP) provided strategies to increase population levels of physical activity. This paper describes (i) the initial accomplishments of the NPAP sector teams, and (ii) results from a process evaluation to determine how the sectors operated, their cross-sector collaboration, challenges encountered, and positive experiences. During 2011, a quarterly reporting system was developed to capture sector-level activities. A year-end interview derived more detailed information. Interviews with 12 sector leads were recorded, transcribed verbatim, and analyzed for common themes. The 6 sectors worked on goals from the implementation plan that focused broadly on education, promotion, intervention, policy, collaboration, and evaluation. Through year-end interviews, themes were generated around operations, goal setting, and cross-sector collaboration. Challenges to the NPAP work included lack of funding and time, the need for marketing and promotion, and organizational support. Positive experiences included collaboration, efficiency of work, enhanced community dynamic, and accomplishments toward NPAP goals. These initial results on the NPAP sector teams can be used as a baseline assessment for future monitoring. The lessons learned may be useful to other practitioners developing evaluations around state- or national-level plans.

  17. Sector Activities and Lessons Learned Around Initial Implementation of the United States National Physical Activity Plan

    PubMed Central

    Evenson, Kelly R.; Satinsky, Sara B.

    2016-01-01

    Background National plans are increasingly common but infrequently evaluated. The 2010 United States National Physical Activity Plan (NPAP) provided strategies to increase population levels of physical activity. This paper describes (i) the initial accomplishments of the NPAP sector teams, and (ii) results from a process evaluation to determine how the sectors operated, their cross-sector collaboration, challenges encountered, and positive experiences. Methods During 2011, a quarterly reporting system was developed to capture sector-level activities. A year-end interview derived more detailed information. Interviews with 12 sector leads were recorded, transcribed verbatim, and analyzed for common themes. Results The 6 sectors worked on goals from the implementation plan that focused broadly on education, promotion, intervention, policy, collaboration, and evaluation. Through year-end interviews, themes were generated around operations, goal setting, and cross-sector collaboration. Challenges to the NPAP work included lack of funding and time, the need for marketing and promotion, and organizational support. Positive experiences included collaboration, efficiency of work, enhanced community dynamic, and accomplishments toward NPAP goals. Conclusions These initial results on the NPAP sector teams can be used as a baseline assessment for future monitoring. The lessons learned may be useful to other practitioners developing evaluations around state- or national-level plans. PMID:24176800

  18. Career satisfaction of Pennsylvanian dentists and dental hygienists and their plans to leave direct patient care.

    PubMed

    Vick, Brandon

    2016-03-01

    The aim of this study is to explore a number of practice-related dynamics between dentists and dental hygienists, including their career dissatisfaction, plans to leave direct patient care, hiring difficulties, and full-time work. Data come from the 2013 Pennsylvania Health Workforce Surveys, a sample of 5,771 dentists and 6,023 dental hygienists, and logistic regression is used to estimate the relationships between outcome areas - dissatisfaction, plans to leave patient care, and hiring/job outcomes - and a number of explanatory variables, including demographic and practice characteristics. Dentists working in practices that employ hygienists have lower odds of reporting overall dissatisfaction and of leaving patient care in the next 6 years than those that do not employ hygienists. Dental hygienists that work full-time hours across two or more jobs have higher odds of dissatisfaction than those who work full-time in one job only. Part-time work in a single hygienist job is associated with higher odds of leaving the career, relative to having a single, full-time job. Results suggest that employment of dental hygienists is associated with lower career dissatisfaction and extended careers for dentists. However, a number of dentist characteristics are associated with difficulty hiring hygienists, including rural practice, nonwhite race, and solo ownership. Only 37.5 percent of hygienists work in a single, full-time job, an outcome related to lower dissatisfaction and extended careers for hygienists. Characteristics associated with this job outcome include having an associate degree, having a local anesthesia permit, and not working for a solo practice. © 2015 American Association of Public Health Dentistry.

  19. Accommodating Change: A Case Study in Planning a Sustainable New Business School Building.

    ERIC Educational Resources Information Center

    Taylor, Lee

    2002-01-01

    Provides a case study of the planning and design of a new building for the Open University Business School. Goals included an energy-efficient building that would break the paradigm of traditional university working methods. (EV)

  20. 28 CFR 91.2 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Comprehensive correctional plan means a plan which represents an integrated approach to the management and... manslaughter, forcible rape, robbery, and aggravated assault as reported to the Federal Bureau of Investigation... offenders, prisoner rehabilitation and treatment programs, prisoner work activities (including to the extent...

  1. Enhancing Motivation for Learning and Work.

    ERIC Educational Resources Information Center

    Kirkhorn, Judith

    1988-01-01

    Discusses motivation based on adult learning conditions, and suggests appropriate motivation plans for leaders and trainers that will enhance performance. The steps to develop motivation plans include assessing current thinking on motivation and reinforcement options; objectively describing expected behaviors; and developing motivational…

  2. 75 FR 27814 - Trinity Adaptive Management Working Group

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ..., 2010. ADDRESSES: The meeting will be held at the Trinity County Library, 211 Main St., Weaverville, CA... include discussion of the following topics: TRRP budget; Science program proposals and work plan...

  3. Working Memory and Cognitive Flexibility Mediates Visuoconstructional Abilities in Older Adults with Heterogeneous Cognitive Ability.

    PubMed

    Ávila, Rafaela T; de Paula, Jonas J; Bicalho, Maria A; Moraes, Edgar N; Nicolato, Rodrigo; Malloy-Diniz, Leandro F; Diniz, Breno S

    2015-05-01

    Previous studies suggest that executive functions influence the performance on visuoconstructional tasks. This study aims to investigate whether the relationship between planning ability and the copy of complex figures is mediated by distinct components of executive functions (i.e., working memory, inhibitory control and cognitive flexibility). We included a 129 older adults with Alzheimer's disease (n=36, AD), mild cognitive impairment (MCI, n=67), and with no evidence of cognitive impairment (controls, n=26). We evaluated the mediation effect of planning abilities, working memory, cognitive flexibility and inhibitory control on visuoconstructional tasks using a multiple mediation models. We found a significant direct effect of planning on visuoconstructional abilities and a partial mediation effect of working memory and cognitive flexibility on visuoconstructional abilities. The present results indicate that the performance on visuoconstructional task is mediated by multiple interrelated executive functions components, in particular working memory and cognitive flexibility.

  4. SWOT analysis of a pediatric rehabilitation programme: a participatory evaluation fostering quality improvement.

    PubMed

    Camden, Chantal; Swaine, Bonnie; Tétreault, Sylvie; Bergeron, Sophie

    2009-01-01

    To present the results of a strengths, weaknesses, opportunities and threats (SWOT) analysis used as part of a process aimed at reorganising services provided within a pediatric rehabilitation programme (PRP) in Quebec, Canada and to report the perceptions of the planning committee members regarding the usefulness of the SWOT in this process. Thirty-six service providers working in the PRP completed a SWOT questionnaire and reported what they felt worked and what did not work in the existing model of care. Their responses were used by a planning committee over a 12-month period to assist in the development of a new service delivery model. Committee members shared their thoughts about the usefulness of the SWOT. Current programme strengths included favourable organisational climate and interdisciplinary work whereas weaknesses included lack of psychosocial support to families and long waiting times for children. Opportunities included working with community partners, whereas fear of losing professional autonomy with the new service model was a threat. The SWOT results helped the planning committee redefine the programme goals and make decisions to improve service coordination. SWOT analysis was deemed as a very useful tool to help guide service reorganisation. SWOT analysis appears to be an interesting evaluation tool to promote awareness among service providers regarding the current functioning of a rehabilitation programme. It fosters their active participation in the reorganisation of a new service delivery model for pediatric rehabilitation.

  5. Software Engineering Improvement Activities/Plan

    NASA Technical Reports Server (NTRS)

    2003-01-01

    bd Systems personnel accomplished the technical responsibilities for this reporting period, as planned. A close working relationship was maintained with personnel of the MSFC Avionics Department Software Group (ED14). Work accomplishments included development, evaluation, and enhancement of a software cost model, performing literature search and evaluation of software tools available for code analysis and requirements analysis, and participating in other relevant software engineering activities. Monthly reports were submitted. This support was provided to the Flight Software Group/ED 1 4 in accomplishing the software engineering improvement engineering activities of the Marshall Space Flight Center (MSFC) Software Engineering Improvement Plan.

  6. How can the rehabilitation planning process at the workplace be improved? A qualitative study from employers' perspective.

    PubMed

    Larsson, Agneta; Gard, Gunvor

    2003-09-01

    Employers in Sweden are by law responsible for planning and controlling the working environment situation in their companies and for ensuring that any need for rehabilitation is noted as soon as possible and that action is taken. This includes developing a plan for rehabilitation. The aim of this study is to describe employers' experiences of the work rehabilitation planning process at the workplace, and how it can be improved with a focus on quality and cost-effectiveness. Qualitative interviews were performed with 10 employers of employee/s that had participated in vocational rehabilitation at a rehabilitation center in the North of Sweden. The results showed that employers were interested in detecting work rehabilitation needs and in taking action early. Rehabilitation at the workplace could be improved by development of routines, improved work relations and work technique, and environment in-service training at the workplace. Prevention was perceived as a prerequisite for a good result of rehabilitation. Attention to social and geographic conditions is needed. Organizational and financial limitations exist.

  7. Managing the construction bidding process : a move to simpler construction plan sets

    DOT National Transportation Integrated Search

    2001-01-31

    This project was conducted to determine whether construction plan sets could be significantly simplified to speed the process of moving projects to construction. The work steps included a literature review, a telephone survey of highway agencies in s...

  8. Business Planning for Parenthood.

    ERIC Educational Resources Information Center

    Spruell, Geraldine

    1986-01-01

    With more mothers than ever in the labor force, companies are realizing they must help workers deal with multiple roles. Employer-sponsored programs include day care centers, vouchers, and referrals; flextime; job sharing; extended leave, flexible benefits, and work-at-home plans; and support groups. (CH)

  9. Effects of acoustic environment on work in private office rooms and open-plan offices - longitudinal study during relocation.

    PubMed

    Kaarlela-Tuomaala, A; Helenius, R; Keskinen, E; Hongisto, V

    2009-11-01

    The aim was to determine how the perceived work environment, especially acoustic environment, and its effects differed in private office rooms and in open-plan offices. The subjects consisted of 31 workers who moved from private office rooms to open-plan offices and who answered the questionnaire before and after the relocation. Private office rooms were occupied only by one person while open-plan offices were occupied by more than 20 persons. Room acoustical descriptors showed a significant reduction in speech privacy after relocation. The noise level averaged over the whole work day did not change but the variability of noise level reduced significantly. Negative effects of acoustic environment increased significantly, including increased distraction, reduced privacy, increased concentration difficulties and increased use of coping strategies. Self-rated loss of work performance because of noise doubled. Cognitively demanding work and phone conversations were most distracted by noise. The benefits that are often associated with open-plan offices did not appear: cooperation became less pleasant and direct and information flow did not change. Nowadays, most office workers, independent of job type, are located in open-plan offices without the individual needs of privacy, concentration and interaction being analysed. This intervention study consisted of professional workers. Their work tasks mainly required individual efforts, and interaction between other workers was not of primary concern, although necessary. The results suggest that the open-plan office is not recommended for professional workers. Similar intervention studies should also be made for other job types.

  10. China SLAT Plan Template

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dietrich, Richard E.

    2016-07-01

    This document serves as the System-Level Acceptance Test (SLAT) Plan for Site Name, City, Country. This test plan is to provide independent testing of the Radiation Detection System (RDS) installed at Site Name to verify that Customs has been delivered a fully-functioning system as required by all contractual commitments. The system includes all installed hardware and software components. The SLAT plan will verify that separate components are working individually and collectively from a system perspective.

  11. The Pregnancy & Motherhood Diary: Planning the First Year of Your Second Career. Revised and Updated.

    ERIC Educational Resources Information Center

    Stautberg, Susan Schiffer

    Intended for women who plan to combine a career with motherhood, this book is a planning document for the full-time working mother-to-be during the three trimesters of pregnancy and the first trimester of motherhood. Each section discusses physical and mental changes associated with motherhood and includes a calendar for appointments and events…

  12. 77 FR 40904 - Agency Information Collection Activities: Submitted for Office of Management and Budget Review...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-11

    ... enforcement activities for oil and gas leases in their jurisdiction. The States and Indian Tribes are working... also must provide periodic accounting documentation to ONRR, including an annual work plan and... Tribes. Estimated Annual Reporting and Recordkeeping ``Hour'' Burden: 5,519 hours. We have not included...

  13. Research on the Intensity Analysis and Result Visualization of Construction Land in Urban Planning

    NASA Astrophysics Data System (ADS)

    Cui, J.; Dong, B.; Li, J.; Li, L.

    2017-09-01

    As a fundamental work of urban planning, the intensity analysis of construction land involves many repetitive data processing works that are prone to cause errors or data precision loss, and the lack of efficient methods and tools to visualizing the analysis results in current urban planning. In the research a portable tool is developed by using the Model Builder technique embedded in ArcGIS to provide automatic data processing and rapid result visualization for the works. A series of basic modules provided by ArcGIS are linked together to shape a whole data processing chain in the tool. Once the required data is imported, the analysis results and related maps and graphs including the intensity values and zoning map, the skyline analysis map etc. are produced automatically. Finally the tool is installation-free and can be dispatched quickly between planning teams.

  14. 40 CFR 35.2214 - Grantee responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... responsibilities. (a) The grantee shall complete the project in accordance with the grant agreement including: The facilities plan that establishes the need for the project; the design drawings and specifications; the plan... treatment works; the project schedule; and all other applicable regulations. The grantee shall maintain and...

  15. 45 CFR 400.154 - Employability services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-sufficiency plan and an individual employability plan, world-of-work and job orientation, job clubs, job workshops, job development, referral to job opportunities, job search, and job placement and followup. (b) Employability assessment services, including aptitude and skills testing. (c) On-the job training, when such...

  16. The Educator's "Action" Office.

    ERIC Educational Resources Information Center

    Martin, Dikran J.

    Design criteria, standards, and human factors related to designing and planning flexible and efficient work environments for college faculty members are overviewed with six model (example) office plans included. The physical and psychological design needs in such an office facility are given, with task performance data on student faculty…

  17. 13 CFR 303.3 - Application requirements and evaluation criteria.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., DEPARTMENT OF COMMERCE PLANNING INVESTMENTS AND COMPREHENSIVE ECONOMIC DEVELOPMENT STRATEGIES § 303.3 Application requirements and evaluation criteria. (a) For Planning Investment awards, EDA uses the general... Investments must include information about the following: (1) The proposed scope of work for the development...

  18. Advertising Theory and Practice.

    ERIC Educational Resources Information Center

    Sandage, C. H.; Fryburger, Vernon

    The social and economic functions of advertising, its role in business, how it works, and how it is planned and created are the subject of this textbook. Sections include basic values and functions, background for planning advertising strategy, the advertising message, advertising media, testing advertising effectiveness, and the advertising…

  19. A Marketing Plan That Works

    ERIC Educational Resources Information Center

    Sparks, Jack D.

    1976-01-01

    Olivet College's marketing plan included survey of students, alumni, townspeople, and doners and analysis of the college's customer appeal, prices, and product mix. The author reports that the marketing objectives are being met and discusses the rationale and problems of applying business marketing principles to education. (JT)

  20. Insurance-related Practices at Title X-funded Family Planning Centers under the Affordable Care Act: Survey and Interview Findings.

    PubMed

    Zolna, Mia R; Kavanaugh, Megan L; Hasstedt, Kinsey

    Given the recent reforms in the United States health care system, including the passage and implementation of the Affordable Care Act, as well as anticipated upcoming changes to health care coverage, it is critical that publicly funded health care providers understand how to effectively work with their states' Medicaid programs and the private health insurance plans in their service areas to provide high-quality contraceptive care to the millions of women relying on services at these sites annually. We collected survey data from a nationally representative sample of 535 clinics providing family planning services that received Title X funding and conducted semistructured interviews with 23 administrators at a subsample of surveyed clinics to explore provider-reported experiences working with health plans and to identify barriers to, and practices that lead to, adequate reimbursement for services provided. Providers report that knowledgeable staff are crucial to securing contracts with both public and private insurance plan issuers, and that the contracts they secure often include coverage restrictions on methods or services clinics offer their clients. Good staff relationships with issuers are key to obtaining adequate and consistent reimbursement for all covered services. Providers are trying to understand how insurance programs in their area knit together. Regardless of how U.S. health policies and delivery systems may change in the coming years, it is imperative that publicly funded family planning centers continue to work with health plans and maximize their third-party revenue to provide services to those in need. Copyright © 2017 The Authors. Published by Elsevier Inc. All rights reserved.

  1. Insurance-related Practices at Title X-funded Family Planning Centers under the Affordable Care Act: Survey and Interview Findings

    PubMed Central

    Zolna, Mia R.; Kavanaugh, Megan L.; Hasstedt, Kinsey

    2018-01-01

    Introduction Given the recent reforms in the United States health care system, including the passage and implementation of the Affordable Care Act, as well as anticipated upcoming changes to health care coverage, it is critical that publicly funded health care providers understand how to effectively work with their states’ Medicaid programs and the private health insurance plans in their service areas to provide high-quality contraceptive care to the millions of women relying on services at these sites annually. Methods We collected survey data from a nationally representative sample of 535 clinics providing family planning services that received Title X funding and conducted semistructured interviews with 23 administrators at a subsample of surveyed clinics to explore provider-reported experiences working with health plans and to identify barriers to, and practices that lead to, adequate reimbursement for services provided. Results Providers report that knowledgeable staff are crucial to securing contracts with both public and private insurance plan issuers, and that the contracts they secure often include coverage restrictions on methods or services clinics offer their clients. Good staff relationships with issuers are key to obtaining adequate and consistent reimbursement for all covered services. Conclusions Providers are trying to understand how insurance programs in their area knit together. Regardless of how U.S. health policies and delivery systems may change in the coming years, it is imperative that publicly funded family planning centers continue to work with health plans and maximize their third-party revenue to provide services to those in need. PMID:29108987

  2. ABA Southern Region Burn disaster plan: the process of creating and experience with the ABA southern region burn disaster plan.

    PubMed

    Kearns, Randy D; Cairns, Bruce A; Hickerson, William L; Holmes, James H

    2014-01-01

    The Southern Region of the American Burn Association began to craft a regional plan to address a surge of burn-injured patients after a mass casualty event in 2004. Published in 2006, this plan has been tested through modeling, exercise, and actual events. This article focuses on the process of how the plan was created, how it was tested, and how it interfaces with other ongoing efforts on preparedness. One key to success regarding how people respond to a disaster can be traced to preexisting relationships and collaborations. These activities would include training or working together and building trust long before the crisis. Knowing who you can call and rely on when you need help, within the context of your plan, can be pivotal in successfully managing a disaster. This article describes how a coalition of burn center leaders came together. Their ongoing personal association has facilitated the development of planning activities and has kept the process dynamic. This article also includes several of the building blocks for developing a plan from creation to composition, implementation, and testing. The plan discussed here is an example of linking leadership, relationships, process, and documentation together. On the basis of these experiences, the authors believe these elements are present in other regions. The intent of this work is to share an experience and to offer it as a guide to aid others in their regional burn disaster planning efforts.

  3. Managing for Successful Control of Naturally Occurring Asbestos During Large Scale Grading

    NASA Astrophysics Data System (ADS)

    Saur, R.; Harnish, D.; Cavanaugh, J.; Kendall, K.; Virdee, A.; Ludlam, D.

    2012-12-01

    Pacific Gas and Electric Company recently completed environmental remediation and civil grading of a 35-acre site in San Francisco Bay Area, and the project became recognized with local agencies as having excellent controls systems for naturally-occurring asbestos (NOA). The project began in 2010 and was completed in 2012, and involved excavating and grading over 100,000 tons of soil containing NOA. The work was subject to requirements by state, local and regional agencies, including an asbestos dust mitigation plan for the Bay Area Air Quality Management District. Effective control of NOA is attributed to management approaches combined with effective monitoring and state-of-the-art controls. Management Planning. The contract for construction specified NOA compliance management and controls, including having a NOA-control "czar" ultimately responsible for effective mitigation. An important element was daily pre-planning for excavation/grading that involved both the NOA mitigation experts and construction staff. Personnel Planning and Training. All construction personnel were trained before work regarding NOA hazards and mitigations. Daily tailboards with all construction personnel included discussions of the NOA controls integral to the daily work. Supervision. A NOA mitigation compliance leader was assigned to each excavation operation, responsible for continuously monitoring wind direction and work to ensure mitigation met requirements, and that disturbed areas were hydrosealed or covered. Adaptive Management - Daily and weekly debriefs occurred with those responsible for NOA controls to evaluate effectiveness, and identify improvements needed. If a monitoring result exceeded the project trigger level, work shut down and a root-cause analysis was performed to determine appropriate corrective actions. Deviations of results from background were researched as to cause, and any adjustments identified. Nearby non-project activities were monitored, as they occasionally caused trigger level exceedences in perimeter monitors, including from off-site vehicles, nearby construction, and mechanical vegetation management (e.g. weed whacking). Regulatory and Owner Oversight. Monitoring results were reported daily to agencies, agencies made frequent inspections, and owner's independent compliance representatives observed the NOA mitigation and provided real-time feedback to the construction team. NOA Controls. NOA emissions were controlled site-wide and for each work activity. Site systems included misting, water trucks on roads, temporary covers and soil sealants. Work activity controls for excavation/grading included both source and perimeter controls. Water application technologies specially designed for NOA fiber mitigation, and not just dust mitigation, were effective without adding excessive water to work areas. These activities collectively created a management structure that facilitated successful implementation of NOA control technologies.

  4. March 2017 MOVES Model Review Work Group Meeting Materials

    EPA Pesticide Factsheets

    MOVES Model Review Work Group meeting on March 201 included plans for updating running exhaust criteria pollutant emission rates for heavy-duty diesel vehicles, emission rates for extended idle and auxiliary power units, onroad vehicle population.

  5. Physics of reactor safety. Quarterly report, January--March 1977. [LMFBR

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1977-06-01

    This report summarizes work done on reactor safety, Monte Carlo analysis of safety-related critical assembly experiments, and planning of DEMI safety-related critical experiments. Work on reactor core thermal-hydraulics is also included.

  6. The space shuttle payload planning working groups. Volume 3: High energy astrophysics

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The findings of the High Energy Astrophysics working group of the space shuttle payload planning activity are presented. The objectives to be accomplished during space shuttle missions are defined as: (1) X-ray astronomy, (2) hard X-ray and gamma ray astronomy, and (3) cosmic ray astronomy. The instruments and test equipment required to accomplish the mission are identified. Recommendations for managing the installation of the equipment and conducting the missions are included.

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, L. M.; Environmental Science Division

    This Work Plan outlines the scope of work to be conducted to investigate the subsurface contaminant conditions at the property formerly leased by the Commodity Credit Corporation (CCC) in Powhattan, Kansas (Figure 1.1). Data obtained during this event will be used to (1) evaluate potential contaminant source areas on the property; (2) determine the vertical and horizontal extent of potential contamination; and (3) provide recommendations for future action, with the ultimate goal of assigning this site No Further Action status. The planned investigation includes groundwater monitoring requested by the Kansas Department of Health and Environment (KDHE), in accordance with Sectionmore » V of the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the U.S. Department of Agriculture (USDA). The work is being performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. A nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy, Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at former CCC/USDA grain storage facilities. Argonne issued a Master Work Plan (Argonne 2002) that has been approved by the KDHE. The Master Work Plan describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. It should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Powhattan.« less

  8. Child Care and Development Fund: Report of State Plans for the Period 10/01/99 to 9/30/01.

    ERIC Educational Resources Information Center

    Stoney, Louise; Stanton, Nina

    The Personal Responsibility and Work Opportunity Reconciliation Act requires each state to submit a biennial plan to implement the Child Care and Development Fund (CCDF). This report is based on the approved State Plans for the period October 1, 1999 to September 30, 2001. The analysis includes information from 48 states, the District of Columbia,…

  9. Books at Work

    ERIC Educational Resources Information Center

    Brown, Joseph

    2006-01-01

    In this article, the author discusses a literature-based character education program at the school district of Hillsborough County in Florida. The district recently developed a comprehensive management plan in response to the much-publicized school violence of recent years. The plan addresses school issues including tornado and fire drills,…

  10. 7 CFR 23.4 - State Rural Development Advisory Council.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 23.4 Agriculture Office of the Secretary of Agriculture STATE AND REGIONAL ANNUAL PLANS OF WORK State... Development Advisory Council will insure that programs proposed under title V including regional programs... research and extension plan which would impact directly on rural development activities being developed or...

  11. 7 CFR 23.4 - State Rural Development Advisory Council.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 23.4 Agriculture Office of the Secretary of Agriculture STATE AND REGIONAL ANNUAL PLANS OF WORK State... Development Advisory Council will insure that programs proposed under title V including regional programs... research and extension plan which would impact directly on rural development activities being developed or...

  12. 7 CFR 23.4 - State Rural Development Advisory Council.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 23.4 Agriculture Office of the Secretary of Agriculture STATE AND REGIONAL ANNUAL PLANS OF WORK State... Development Advisory Council will insure that programs proposed under title V including regional programs... research and extension plan which would impact directly on rural development activities being developed or...

  13. 7 CFR 23.4 - State Rural Development Advisory Council.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 23.4 Agriculture Office of the Secretary of Agriculture STATE AND REGIONAL ANNUAL PLANS OF WORK State... Development Advisory Council will insure that programs proposed under title V including regional programs... research and extension plan which would impact directly on rural development activities being developed or...

  14. Teaching the Public Relations Campaigns Course.

    ERIC Educational Resources Information Center

    Worley, Debra A.

    2001-01-01

    Argues for a Campaign Planning Course in the undergraduate public relations major. Discusses nine course objectives. Describes five phases of campaign planning and implementation, how the phase approach includes important course topics, and how it fulfills course objectives. Describes how student groups work with actual clients throughout the…

  15. Automated Procurement System (APS) revised project management plan (DS-03)

    NASA Technical Reports Server (NTRS)

    Murphy, Diane R.

    1995-01-01

    The Project Plan is the governing document for the implementation of the Automated Procurement System (APS). It includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

  16. Working Papers in Educational Linguistics, 1996-1997.

    ERIC Educational Resources Information Center

    Furumoto, Mitchell A., Ed.; And Others

    1997-01-01

    Reports of language research in the 1996 issue include: "Corpus Planning for the Southern Peruvian Quechua Language" (Serafin M. Coronel-Molina); "Foreign Language Planning in U.S. Higher Education: The Case of a Graduate Business Program" (Mitchell A. Furumoto); "Charting New Directions: Of Communication in a Social…

  17. Combined Release and Radiation Effects Satellite (CRRES) Experiment: Educational planning and coordination

    NASA Technical Reports Server (NTRS)

    Vaughan, William W.; Alzmann, Melanie

    1991-01-01

    The efforts conducted to provide educational planning and development support for the Combined Release and Radiation Satellite (CRRES) Experiment are summarized. Activities regarding the scientific working group and workshop development are presented including the preparation of descriptive information on the CRRES Project.

  18. Preschool Teachers' Financial Well-Being and Work Time Supports: Associations with Children's Emotional Expressions and Behaviors in Classrooms

    ERIC Educational Resources Information Center

    King, Elizabeth K.; Johnson, Amy V.; Cassidy, Deborah J.; Wang, Yudan C.; Lower, Joanna K.; Kintner-Duffy, Victoria L.

    2016-01-01

    The current study examined associations among teachers' financial well-being, including teachers' wages and their perceptions of their ability to pay for basic expenses, and teachers' work time supports, including teachers' paid planning time, vacation days, and sick days, and children's positive emotional expressions and behaviors in preschool…

  19. Edward W. Jennings | NREL

    Science.gov Websites

    practices promoting a safe and supportive working environment. His research interests include environmental, safety, and health (ESH) and facility issues, he is responsible for implementing safe work plan; working directly with awardees by performing on-site validations to collect and analyze enzyme

  20. EOS Laser Atmosphere Wind Sounder (LAWS) investigation

    NASA Technical Reports Server (NTRS)

    Emmitt, George D.

    1991-01-01

    The related activities of the contract are outlined for the first year. These include: (1) attend team member meetings; (2) support EOS Project with science related activities; (3) prepare and Execution Phase plan; and (4) support LAWS and EOSDIS related work. Attached to the report is an appendix, 'LAWS Algorithm Development and Evaluation Laboratory (LADEL)'. Also attached is a copy of a proposal to the NASA EOS for 'LAWS Sampling Strategies and Wind Computation Algorithms -- Storm-Top Divergence Studies. Volume I: Investigation and Technical Plan, Data Plan, Computer Facilities Plan, Management Plan.'

  1. Integrated Planning for Telepresence with Time Delays

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.; Rabe, Kenneth J.

    2006-01-01

    Integrated planning and execution of teleoperations in space with time delays is shown. The topics include: 1) The Problem; 2) Future Robot Surgery? 3) Approach Overview; 4) Robonaut; 5) Normal Planning and Execution; 6) Planner Context; 7) Implementation; 8) Use of JSHOP2; 9) Monitoring and Testing GUI; 10) Normal sequence: first the supervisor acts; 11) then the robot; 12) Robot might be late; 13) Supervisor can work ahead; 14) Deviations from Plan; 15) Robot State Change Example; 16) Accomplished goals skipped in replan; 17) Planning continuity; 18) Supervisor Deviation From Plan; 19) Intentional Deviation; and 20) Infeasible states.

  2. Proposal and work plan to calibrate and verify a water-quality model to simulate effects of wastewater discharges to the Red River of the North at drought streamflow near Fargo, North Dakota, and Moorhead, Minnesota

    USGS Publications Warehouse

    Wesolowski, Edwin A.

    2000-01-01

    This report presents a proposal for conducting a water-quality modeling study at drought streamflow, a detailed comprehensive plan for collecting the data, and an annual drought-formation monitoring plan. A 30.8 mile reach of the Red River of the North receives treated wastewater from plants at Fargo, North Dakota, and Moorhead, Minnesota, and streamflow from the Sheyenne River. The water-quality modeling study will evaluate the effects of continuous treated-wastewater discharges to the study reach at drought streamflow. The study will define hydraulic characteristics and reaeration and selected reaction coefficients and will calibrate and verity a model.The study includes collecting synoptic water-quality samples for various types of analyses at a number of sites in the study reach. Dye and gas samples will be collected for traveltime and reaeration measurements. Using the Lagrangian reference frame, synoptic water-quality samples will be collected for analysis of nutrients, chlorophyll a, alkalinity, and carbonaceous biochemical oxygen demand. Field measurements will be made of specific conductance, pH, air and water temperature, dissolved oxygen, and sediment oxygen demand. Two sets of water-quality data will be collected. One data set will be used to calibrate the model, and the other data set will be used to verity the model.The DAFLOW/BLTM models will be used to evaluate the effects of the treated wastewater on the water quality of the river. The model will simulate specific conductance, temperature, dissolved oxygen, carbonaceous biochemical oxygen demand, total nitrogen (organic, ammonia, nitrite, nitrate), total orthophosphorus, total phosphorus, and phytoplankton as chlorophyll a.The work plan identifies and discusses the work elements needed for accomplishing the data collection for the study. The work elements specify who will provide personnel, vehicles, instruments, and supplies needed during data collection. The work plan contains instructions for data collection; inventory lists of needed personnel, vehicles, instruments, and supplies; and examples of computations for determining quantities of tracer to be injected into the stream. The work plan also contains an annual drought-formation monitoring plan that includes a 9-month time line that specifies when essential planning actions must occur before actual project start up. Drought streamflows are rare. The annual drought-formation monitoring plan is presented to assist project planning by providing early warning that conditions are favorable to produce drought streamflow. The plan to monitor drought-forming conditions discusses the drought indices to be monitored. To establish a baseline, historic values for some of the drought indices for selected years were reviewed. An annual review of the drought indices is recommended.

  3. Positive behavioral support planning in the inpatient treatment of severe disruptive behaviors: A description of service features.

    PubMed

    Hamlett, Nakia M; Carr, Erika R; Hillbrand, Marc

    2016-05-01

    Positive behavior support (PBS) plans are increasingly used on inpatient units to assess and treat serious and dangerous behaviors displayed by patients with serious psychiatric impairment. A contemporary extension of traditional applied behavior analytic procedures, PBS plans integrate theories from several domains with perspectives on community psychology, positive psychology, and recovery-oriented care. Because there is little evidence to suggest that more invasive, punitive disciplinary strategies lead to long-term positive behavioral change (Parkes, 1996), PBS plans have emerged as an alternative to the use of seclusion and restraint or other forms of restrictive measures typically used on inpatient psychiatric units (Hammer et al., 2011). Moreover, PBS plans are a preferred method of intervention because more invasive interventions often cause more harm than good to all involved (Elliott et al., 2005). This article seeks to provide an integrated framework for the development of positive behavior support plans in inpatient psychiatric settings. In addition to explicating the philosophy and core elements of PBS plans, this work includes discussion of the didactic and pragmatic aspects of training clinical staff in inpatient mental health settings. A case vignette is included for illustration and to highlight the use of PBS plans as a mechanism for helping patients transition to less restrictive settings. This work will add to the scant literature examining the use of positive behavioral support plans in inpatient psychiatric settings. (PsycINFO Database Record (c) 2016 APA, all rights reserved).

  4. December 2016 MOVES Model Review Work Group Meeting Materials

    EPA Pesticide Factsheets

    MOVES Model Review Work Group meeting on December 7th, 2016 included plans for updating running exhaust criteria pollutant emission rates for heavy-duty diesel vehicles, emission rates for extended idle and auxiliary power units, onroad vehicle population.

  5. 40 CFR 35.905 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...

  6. 40 CFR 35.905 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...

  7. 40 CFR 35.905 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...

  8. 40 CFR 35.905 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...

  9. 40 CFR 35.905 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...

  10. Rewiring a Working Library or Teaching an Old Dog New Tricks.

    ERIC Educational Resources Information Center

    White, Robert L.; Jaffe, Lee David

    1995-01-01

    This case study describes the planning, funding, and implementation of a complete data-wiring renovation at the University of California, Santa Cruz library. Highlights include design principles; project schedule; benefits for staff's electronic mail and network use and for upgraded public terminals; and the importance of planning and…

  11. Planning Your Retirement.

    ERIC Educational Resources Information Center

    American Association of Retired Persons, Washington, DC.

    This guidebook raises important issues for older workers to think about in planning for retirement. Sections of the book explore such areas as the following: changing roles and relationships; health and fitness; meaningful use of time, with a sampler of activities from which one may choose; working options, including a brief description of a…

  12. An Analysis of Outsourcing of Installation Services Under Office of Management and Budget (OMB) Circular A-76.

    DTIC Science & Technology

    1999-12-01

    agreement, on a reimbursable basis. This includes franchise funds, revolving funds and working capital funds. Management Plan.—The Management Plan...Operation of cafeterias, mess halls, kitchens, bakeries , dairies, and commissaries • Vending machines • Ice and water HEALTH SERVICES • Surgical

  13. Simulation Based Evaluation of Integrated Adaptive Control and Flight Planning Technologies

    NASA Technical Reports Server (NTRS)

    Campbell, Stefan Forrest; Kaneshige, John T.

    2008-01-01

    The objective of this work is to leverage NASA resources to enable effective evaluation of resilient aircraft technologies through simulation. This includes examining strengths and weaknesses of adaptive controllers, emergency flight planning algorithms, and flight envelope determination algorithms both individually and as an integrated package.

  14. Manipulation strategies for massive space payloads

    NASA Technical Reports Server (NTRS)

    Book, Wayne J.

    1991-01-01

    Motion planning and control for the joints of flexible manipulators are discussed. Specific topics covered include control of a flexible braced manipulator, control of a small working robot on a large flexible manipulator to suppress vibrations, control strategies for ensuring cooperation among disparate manipulators, and motion planning for robots in free-fall.

  15. Wildland planning glossary

    Treesearch

    Charles F. Schwarz; Edward C. Thor; Gary H. Elsner

    1976-01-01

    More than 1400 terms useful in wildland and related resource planning are defined. The purpose of the work is to facilitate communication between professionals, not to provide them with exhaustive vocabularies of each other's specialties. Definitions are drawn from many sources, including public laws and government manuals, but are not intended to establish...

  16. Women's attitudes towards mechanisms of action of family planning methods: survey in primary health centres in Pamplona, Spain.

    PubMed

    de Irala, Jokin; Lopez del Burgo, Cristina; Lopez de Fez, Carmen M; Arredondo, Jorge; Mikolajczyk, Rafael T; Stanford, Joseph B

    2007-06-27

    Informed consent in family planning includes knowledge of mechanism of action. Some methods of family planning occasionally work after fertilization. Knowing about postfertilization effects may be important to some women before choosing a certain family planning method. The objective of this survey is to explore women's attitudes towards postfertilization effects of family planning methods, and beliefs and characteristics possibly associated with those attitudes. Cross-sectional survey in a sample of 755 potentially fertile women, aged 18-49, from Primary Care Health Centres in Pamplona, Spain. Participants were given a 30-item, self-administered, anonymous questionnaire about family planning methods and medical and surgical abortion. Logistic regression was used to identify variables associated with women's attitudes towards postfertilization effects. The response rate was 80%. The majority of women were married, held an academic degree and had no children. Forty percent of women would not consider using a method that may work after fertilization but before implantation and 57% would not consider using one that may work after implantation. While 35.3% of the sample would stop using a method if they learned that it sometimes works after fertilization, this percentage increased to 56.3% when referring to a method that sometimes works after implantation. Women who believe that human life begins at fertilization and those who consider it is important to distinguish between natural and induced embryo loss were less likely to consider the use of a method with postfertilization effects. Information about potential postfertilization effects of family planning methods may influence women's acceptance and choice of a particular family planning method. Additional studies in other populations are necessary to evaluate whether these beliefs are important to those populations.

  17. Eliminating Space Debris: Applied Technology and Policy Prescriptions, Fall 2007 - Project 07-02

    DTIC Science & Technology

    2008-01-01

    plan to transfer ownership of the constellation, Iridium satellites were (presume that there was more than one) scheduled to be sent out of orbit to...told the research team that administrators are “not shy” about saying, “We have a problem with your debris plan .” Usually, the licensee will work... planned maneuvers • End-of-life (EOL) support. Includes re-entry support and planned de-orbit operations • Anomaly re configuration • Emergency ser

  18. Work unit compensation.

    PubMed

    Sodano, M J

    1991-01-01

    The author describes an innovative "work unit compensation" system that acts as an adjunct to existing personnel payment structures. The process, developed as a win-win alternative for both employees and their institution, includes a reward system for the entire department and insures a team atmosphere. The Community Medical Center in Toms River, New Jersey developed the plan which sets the four basic goals: to be fair, economical, lasting and transferable (FELT). The plan has proven to be a useful tool in retention and recruitment of qualified personnel.

  19. Geotechnical support and topical studies for nuclear waste geologic repositories

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1989-01-01

    The present report lists the technical reviews and comments made during the fiscal year 1988 and summarizes the technical progress of the topical studies. In the area of technical assistance, there were numerous activities detailed in the next section. These included 24 geotechnical support activities, including reviews of 6 Study Plans (SP) and participation in 6 SP Review Workshops, review of one whole document Site Characterization Plan (SCP) and participation in the Assembled Document SCP Review Workshops by 6 LBL reviewers; the hosting of a DOE program review, the rewriting of the project statement of work, 2 trips to technicalmore » and planning meetings; preparation of proposed work statements for two new topics for DOE, and 5 instances of technical assistance to DOE. These activities are described in a Table in the following section entitled Geoscience Technical Support for Nuclear Waste Geologic Repositories.''« less

  20. Electric Motors Maintenance Planning From Its Operating Variables

    NASA Astrophysics Data System (ADS)

    Rodrigues, Francisco; Fonseca, Inácio; Farinha, José Torres; Ferreira, Luís; Galar, Diego

    2017-09-01

    The maintenance planning corresponds to an approach that seeks to maximize the availability of equipment and, consequently, increase the levels of competitiveness of companies by increasing production times. This paper presents a maintenance planning based on operating variables (number of hours worked, duty cycles, number of revolutions) to maximizing the availability of operation of electrical motors. The reading of the operating variables and its sampling is done based on predetermined sampling cycles and subsequently is made the data analysis through time series algorithms aiming to launch work orders before reaching the variables limit values. This approach is supported by tools and technologies such as logical applications that enable a graphical user interface for access to relevant information about their Physical Asset HMI (Human Machine Interface), including the control and supervision by acquisition through SCADA (Supervisory Control And data acquisition) data, also including the communication protocols among different logical applications.

  1. Housing, health and master planning: rules of engagement.

    PubMed

    Harris, P; Haigh, F; Thornell, M; Molloy, L; Sainsbury, P

    2014-04-01

    Knowledge about health focussed policy collaboration to date has been either tactical or technical. This article focusses on both technical and tactical issues to describe the experience of cross-sectoral collaboration between health and housing stakeholders across the life of a housing master plan, including but not limited to a health impact assessment (HIA). A single explanatory case study of collaboration on a master plan to regenerate a deprived housing estate in Western Sydney was developed to explain why and how the collaboration worked or did not work. Data collection included stakeholder interviews, document review, and reflections by the health team. Following a realist approach, data was analysed against established public policy theory dimensions. Tactically we did not know what we were doing. Despite our technical knowledge and skills with health focussed processes, particularly HIA, we failed to appreciate complexities inherent in master planning. This limited our ability to provide information at the right points. Eventually however the HIA did provide substantive connections between the master plan and health. We use our analysis to develop technical and tactical rules of engagement for future cross-sectoral collaboration. This case study from the field provides insight for future health focussed policy collaboration. We demonstrate the technical and tactical requirements for future intersectoral policy and planning collaborations, including HIAs, with the housing sector on master planning. The experience also suggested how HIAs can be conducted flexibly alongside policy development rather than at a specific point after a policy is drafted. Copyright © 2014 The Royal Society for Public Health. All rights reserved.

  2. Sexuality education on the job.

    PubMed

    1998-01-01

    The Asociacion Demografica Salvadorena (ADS) has been working with the UN Population Fund (UNFPA) in El Salvador since November 1995 to provide sexual and reproductive health services to the country's working classes. UNFPA funding is provided through the Salvadoran government. ADS has entered the commercial and labor sectors to provide sexual and reproductive health services, and expand related public education programs to marginalized working class urban residents of El Salvador's Zona Central. The project has thus far created 25 Reproductive Health Units (UDESAR) in a number of companies, overseen by trained personnel who offer family planning and counseling services, including family planning methods, and the detection of cervical/uterine cancer, breast self-examination, HIV/STD prevention, and the determination of reproductive risk. Volunteers trained by ADS in sexual and reproductive health from a gender perspective, including decision-making and raising women's levels of self-esteem and decision-making capabilities in family planning, safe sex, and general sexual health, help project leaders by educating and motivating co-workers. ADS's involvement in promoting reproductive health in El Salvador has also given the organization an opportunity to broaden its relationship with international agencies.

  3. Sherry Stout | NREL

    Science.gov Websites

    works on international programs where she focuses on grid integration of distributed renewable works on resilience issues including distributed generation and microgrids for energy system resilience Communities Water, Energy, Food Nexus Planning and Analysis Grid Integration of Distributed Generation

  4. Managing Time and Tasks.

    ERIC Educational Resources Information Center

    Handy, Alice Evans; Yucht, Alice H.

    1993-01-01

    Includes two articles that discuss time management and mail management strategies for librarians. Highlights include identifying personal work styles; planning and prioritizing; using calendars and computers; reexamining traffic patterns; delegating; and sorting and handling mail. (Contains eight references.) (LRW)

  5. 40 CFR 60.103a - Work practice standards.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... becomes an affected flare subject to this subpart. The plan must include: (1) A diagram illustrating all connections to the flare; (2) Methods for monitoring flow rate to the flare, including a detailed description...

  6. 40 CFR 60.103a - Work practice standards.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... becomes an affected flare subject to this subpart. The plan must include: (1) A diagram illustrating all connections to the flare; (2) Methods for monitoring flow rate to the flare, including a detailed description...

  7. 45 CFR 286.80 - What information on minimum work participation requirements must a Tribe include in its Tribal...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... include in its Tribal Family Assistance Plan? (a) To assess a Tribe's level of success in meeting its TANF... “reasonable” for purposes of this subsection, along with: (A) An explanation of how the economic conditions... proposed work requirements are consistent with the purposes of TANF and with the economic conditions and...

  8. 30 CFR 77.1101 - Escape and evacuation; plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... where persons are required to work or travel including buildings and equipment and in areas where persons normally congregate during the work shift. (Pub. L. No. 96-511, 94 Stat. 2812 (44 U.S.C. 3501 et... HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES...

  9. Inverse-optimized 3D conformal planning: Minimizing complexity while achieving equivalence with beamlet IMRT in multiple clinical sites

    PubMed Central

    Fraass, Benedick A.; Steers, Jennifer M.; Matuszak, Martha M.; McShan, Daniel L.

    2012-01-01

    Purpose: Inverse planned intensity modulated radiation therapy (IMRT) has helped many centers implement highly conformal treatment planning with beamlet-based techniques. The many comparisons between IMRT and 3D conformal (3DCRT) plans, however, have been limited because most 3DCRT plans are forward-planned while IMRT plans utilize inverse planning, meaning both optimization and delivery techniques are different. This work avoids that problem by comparing 3D plans generated with a unique inverse planning method for 3DCRT called inverse-optimized 3D (IO-3D) conformal planning. Since IO-3D and the beamlet IMRT to which it is compared use the same optimization techniques, cost functions, and plan evaluation tools, direct comparisons between IMRT and simple, optimized IO-3D plans are possible. Though IO-3D has some similarity to direct aperture optimization (DAO), since it directly optimizes the apertures used, IO-3D is specifically designed for 3DCRT fields (i.e., 1–2 apertures per beam) rather than starting with IMRT-like modulation and then optimizing aperture shapes. The two algorithms are very different in design, implementation, and use. The goals of this work include using IO-3D to evaluate how close simple but optimized IO-3D plans come to nonconstrained beamlet IMRT, showing that optimization, rather than modulation, may be the most important aspect of IMRT (for some sites). Methods: The IO-3D dose calculation and optimization functionality is integrated in the in-house 3D planning/optimization system. New features include random point dose calculation distributions, costlet and cost function capabilities, fast dose volume histogram (DVH) and plan evaluation tools, optimization search strategies designed for IO-3D, and an improved, reimplemented edge/octree calculation algorithm. The IO-3D optimization, in distinction to DAO, is designed to optimize 3D conformal plans (one to two segments per beam) and optimizes MLC segment shapes and weights with various user-controllable search strategies which optimize plans without beamlet or pencil beam approximations. IO-3D allows comparisons of beamlet, multisegment, and conformal plans optimized using the same cost functions, dose points, and plan evaluation metrics, so quantitative comparisons are straightforward. Here, comparisons of IO-3D and beamlet IMRT techniques are presented for breast, brain, liver, and lung plans. Results: IO-3D achieves high quality results comparable to beamlet IMRT, for many situations. Though the IO-3D plans have many fewer degrees of freedom for the optimization, this work finds that IO-3D plans with only one to two segments per beam are dosimetrically equivalent (or nearly so) to the beamlet IMRT plans, for several sites. IO-3D also reduces plan complexity significantly. Here, monitor units per fraction (MU/Fx) for IO-3D plans were 22%–68% less than that for the 1 cm × 1 cm beamlet IMRT plans and 72%–84% than the 0.5 cm × 0.5 cm beamlet IMRT plans. Conclusions: The unique IO-3D algorithm illustrates that inverse planning can achieve high quality 3D conformal plans equivalent (or nearly so) to unconstrained beamlet IMRT plans, for many sites. IO-3D thus provides the potential to optimize flat or few-segment 3DCRT plans, creating less complex optimized plans which are efficient and simple to deliver. The less complex IO-3D plans have operational advantages for scenarios including adaptive replanning, cases with interfraction and intrafraction motion, and pediatric patients. PMID:22755717

  10. 45 CFR 286.80 - What information on minimum work participation requirements must a Tribe include in its Tribal...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) For each fiscal year covered by the plan, the Tribe's proposed minimum number of hours per week that... the hours of work participation, it must so indicate in its TFAP along with a definition of... the purposes of TANF; (3) The work activities that count towards these work requirements; (4) Any...

  11. Gathering Momentum! Transition from School to Work. Featuring Profiles of 23 Ohio Programs.

    ERIC Educational Resources Information Center

    Gifford, Bev

    This report examines the provisions of the School-to-Work Opportunities Act and describes the steps that have been taken thus far to establish an Ohio system. It discusses the general features that must be included in Ohio's school-to-work system and the strategies around which Ohio's school-to-work plans are being structured. Recommendations are…

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, L. M.

    This Work Plan outlines the scope of work that will be conducted to investigate the subsurface contaminant conditions at the property formerly leased by the Commodity Credit Corporation (CCC) in Ramona, Kansas (Figure 1.1). Data obtained during this event will be used to (1) evaluate potential source areas on the property, (2) determine the vertical and horizontal extent of potential contamination, and (3) provide recommendations for future actions, with the ultimate goal of assigning this site No Further Action status. The planned investigation includes groundwater monitoring requested by the Kansas Department of Health and Environment (KDHE), in accordance with Sectionmore » V of the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the United States Department of Agriculture (USDA). The work is being performed on behalf of the CCC/USDA by the Environmental Research Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy. Under the Intergovernmental Agreement, Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at former CCC/USDA grain storage facilities. Argonne has issued a Master Work Plan (Argonne 2002) that describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. The Master Work Plan was approved by the KDHE. It contains materials common to investigations at locations in Kansas and should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Ramona.« less

  13. MRI-based dynamic tracking of an untethered ferromagnetic microcapsule navigating in liquid

    NASA Astrophysics Data System (ADS)

    Dahmen, Christian; Belharet, Karim; Folio, David; Ferreira, Antoine; Fatikow, Sergej

    2016-04-01

    The propulsion of ferromagnetic objects by means of MRI gradients is a promising approach to enable new forms of therapy. In this work, necessary techniques are presented to make this approach work. This includes path planning algorithms working on MRI data, ferromagnetic artifact imaging and a tracking algorithm which delivers position feedback for the ferromagnetic objects, and a propulsion sequence to enable interleaved magnetic propulsion and imaging. Using a dedicated software environment, integrating path-planning methods and real-time tracking, a clinical MRI system is adapted to provide this new functionality for controlled interventional targeted therapeutic applications. Through MRI-based sensing analysis, this article aims to propose a framework to plan a robust pathway to enhance the navigation ability to reach deep locations in the human body. The proposed approaches are validated with different experiments.

  14. 45 CFR 287.90 - Are Tribes required to complete any certifications?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 2 2012-10-01 2012-10-01 false Are Tribes required to complete any certifications... SERVICES THE NATIVE EMPLOYMENT WORKS (NEW) PROGRAM Plan Requirements § 287.90 Are Tribes required to complete any certifications? Yes. A Tribe must include in its NEW Program plan the following four...

  15. 45 CFR 287.90 - Are Tribes required to complete any certifications?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 2 2013-10-01 2012-10-01 true Are Tribes required to complete any certifications... SERVICES THE NATIVE EMPLOYMENT WORKS (NEW) PROGRAM Plan Requirements § 287.90 Are Tribes required to complete any certifications? Yes. A Tribe must include in its NEW Program plan the following four...

  16. 45 CFR 287.90 - Are Tribes required to complete any certifications?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 2 2014-10-01 2012-10-01 true Are Tribes required to complete any certifications... SERVICES THE NATIVE EMPLOYMENT WORKS (NEW) PROGRAM Plan Requirements § 287.90 Are Tribes required to complete any certifications? Yes. A Tribe must include in its NEW Program plan the following four...

  17. 45 CFR 287.90 - Are Tribes required to complete any certifications?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 2 2011-10-01 2011-10-01 false Are Tribes required to complete any certifications... SERVICES THE NATIVE EMPLOYMENT WORKS (NEW) PROGRAM Plan Requirements § 287.90 Are Tribes required to complete any certifications? Yes. A Tribe must include in its NEW Program plan the following four...

  18. Planned and Unplanned Aspects of Occupational Choices by Youth. Final Report.

    ERIC Educational Resources Information Center

    Ellis, Robert A.; And Others

    This document includes reports on four subjects relevant to planned and unplanned aspects of occupational choices by youth. (1) "Toward a Morphology of Occupational Choice," by Robert A. Ellis and others, discusses intrinsic features and extrinsic rewards of work, extra-role considerations, and goal perception as major influences on occupational…

  19. Teachers' Cognitive Activities and Overt Behaviors.

    ERIC Educational Resources Information Center

    Brophy, Jere E.

    Recent research on teacher planning, thinking, and decision making is reviewed. The work on planning reveals that teachers typically do not use the objectives-based, rational models stressed in textbooks, but instead concentrate on the activities included in a curriculum as they seem to relate to the needs and interests of the students. This…

  20. Research Utilizing Problem Solving (RUPS) - Classroom Version. Description of Teacher Inservice Education Materials.

    ERIC Educational Resources Information Center

    National Education Association, Washington, DC. Project on Utilization of Inservice Education R & D Outcomes.

    The workshop instructional materials described here are designed to try out a systematic problem solving process as a way of working toward improvements in the school setting. Topics include diagnosis using force field technique, small group dynamics, planning for action, and planning a RUPS (Research Using Problem Solving) project. This…

  1. Waste Encapsulation and Storage Facility (WESF) Dangerous Waste Training Plan (DWTP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SIMMONS, F.M.

    2000-03-29

    This Waste Encapsulation Storage Facility (WESF) Dangerous Waste Training Plan (DWTP) applies to personnel who perform work at, or in support of WESF. The plan, along with the names of personnel, may be given to a regulatory agency inspector upon request. General workers, subcontractors, or visiting personnel who have not been trained in the management of dangerous wastes must be accompanied by an individual who meets the requirements of this training plan. Dangerous waste management includes handling, treatment, storage, and/or disposal of dangerous and/or mixed waste. Dangerous waste management units covered by this plan include: less-than-90-day accumulation area(s); pool cellsmore » 1-8 and 12 storage units; and process cells A-G storage units. This training plan describes general requirements, worker categories, and provides course descriptions for operation of the WESF permitted miscellaneous storage units and the Less-than-90-Day Accumulation Areas.« less

  2. School-to-Work: Elements of Successful Programs.

    ERIC Educational Resources Information Center

    Wehman, Paul

    1990-01-01

    Critical elements and best practices in school-to-work transition programs for disabled youth are identified. Noted are local factors, individual student choice, shared resources, vocational rehabilitation counselors in the schools, and school-business linkages. Best practices include individualized transition planning, community-based…

  3. 75 FR 52701 - Approval and Promulgation of Implementation Plans; State of Missouri

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-27

    ... information claimed to be Confidential Business Information (CBI) or other information whose disclosure is.... Ventilation Limits 5. Ongoing Ventilation Testing and Reporting Requirements 6. Winter Construction Work..., including building enclosure and ventilation projects, implementation of work practice standards, process...

  4. Benchmark requirements for the the Energy Emergency Management Information System (EEMIS). Phase 1: Work plan

    NASA Astrophysics Data System (ADS)

    1980-09-01

    The energy emergency management information system (EEMIS) has responsibility for providing special information and communication services to government officials at Federal and state levels, who must deal with energy emergencies. Because of proprietary information residing in the data base used for federal purposes, a special system (EEMIS-S) must be established for use by the states. It is planned to acquire teleprocessing services for EEMIS-S from a time-sharing commercial vendor, and the process for procurement must meet guidelines for approval. The work plan and schedule for meeting these guidelines are discussed. Tasks to be included contain estimates of time, cost, and resources required, all of which are briefly described.

  5. Strategic planning in a complex academic environment: lessons from one academic health center.

    PubMed

    Levinson, Wendy; Axler, Helena

    2007-08-01

    Leaders in academic health centers (AHCs) must create a vision for their academic unit embedded in a complex environment. A formal strategic planning process can be valuable to help shape a clear vision taking advantage of potential collaborations and to develop specific achievable long- and short-term goals. The authors describe the steps in a formal strategic planning process and illustrate it with the example of the Department of Medicine at the University of Toronto Faculty of Medicine beginning in 2004. The process included the active participation of over 300 faculty members, trainees, and stakeholders of the department and resulted in broad-based support and leadership for the resulting plan. The authors describe the steps, which include getting started, committing to planning principles, establishing the work plan, understanding the environment, pulling it all together, shaping the vision, testing strategic directions, building effective implementation, and promoting the plan. Articulation of vision, mission, and values informed the plan's development, as well as 10 key principles integral to the plan. Challenges and lessons learned are also described. The final strategic plan is an active core activity of the department, guiding decisions and resource allocation and facilitating measurement of success or shortcomings. The process the authors describe is applicable to multiple academic units, including divisions/sections, departments, or thematic programs in AHCs.

  6. Are care plans suitable for the management of multiple conditions?

    PubMed Central

    Young, Charlotte E.; Boyle, Frances M.; Mutch, Allyson J.

    2016-01-01

    Background Care plans have been part of the primary care landscape in Australia for almost two decades. With an increasing number of patients presenting with multiple chronic conditions, it is timely to consider whether care plans meet the needs of patients and clinicians. Objectives To review and benchmark existing care plan templates that include recommendations for comorbid conditions, against four key criteria: (i) patient preferences, (ii) setting priorities, (iii) identifying conflicts and synergies between conditions, and (iv) setting dates for reviewing the care plan. Design Document analysis of Australian care plan templates published from 2006 to 2014 that incorporated recommendations for managing comorbid conditions in primary care. Results Sixteen templates were reviewed. All of the care plan templates addressed patient preference, but this was not done comprehensively. Only three templates included setting priorities. None assisted in identifying conflicts and synergies between conditions. Fifteen templates included setting a date for reviewing the care plan. Conclusions Care plans are a well-used tool in primary care practice, but their current format perpetuates a single-disease approach to care, which works contrary to their intended purpose. Restructuring care plans to incorporate shared decision-making and attention to patient preferences may assist in shifting the focus back to the patient and their care needs. PMID:29090181

  7. National Space Transportation and Support Study/technology requirements and plans

    NASA Technical Reports Server (NTRS)

    Walberg, G. D.; Gasperich, F. J., Jr.; Scheyhing, E. R.

    1986-01-01

    This paper presents a generic technology plan which has been developed as part of the National Space Transportation and Support Study. This program, which addresses a wide variety of potentially high payoff technology areas, is structured to promote both enhanced vehicle performance and greatly improved operational efficiency and includes both evolutionary and breakthrough technologies. The plan is presented in terms of disciplinary plan elements, which were developed by joint NASA/USAF disciplinary working groups, and as a set of demonstration projects which serve as focal points for the overall plan and drive the development of the many interrelated disciplinary activities.

  8. Publication planning 101.

    PubMed

    Sismondo, Sergio; Nicholson, Scott Howard

    2009-01-01

    Publication planning is the sub-industry to the pharmaceutical industry that does the organizational and practical work of shaping pharmaceutical companies' data and turning it into medical journal articles. Its main purpose is to create and communicate scientific information to support the marketing of products. This report is based mostly on information presented at the 2007 annual meeting of the International Society of Medical Planning Professionals, including a workshop entitled "Publication Planning 101/201", attended by one of us. We provide some analysis of the role of publication planning in medical publishing, and its implications for the structuring of medical knowledge.

  9. The space shuttle payload planning working groups. Volume 4: Life sciences

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The findings of the Life Sciences working group of the space shuttle payload planning activity are presented. The objectives of the Life Sciences investigations are: (1) to continue the research directed at understanding the origin of life and the search for extraterrestrial evidence of life, (2) biomedical research to understand mechanisms and provide criteria for support of manned flight, (3) technology development for life support, protective systems, and work aids for providing environmental control, and (4) to study basic biological functions at all levels or organization influenced by gravity, radiation, and circadian rhythms. Examples of candidate experimental schedules and the experimental package functional requirements are included.

  10. The 25 kW power module evolution study. Part 3: Conceptual designs for power module evolution. Volume 2: Program plans

    NASA Technical Reports Server (NTRS)

    1979-01-01

    A plan is presented for the evolutionary development and deployment of the power module system with performance capabilities required to support the 1983 to 1990 user requirements. Aspects summarized include program functional, operational, and hardware elements; program work breakdown and specification items; development plans and schedules for developmental and technology milestones; test concepts and timeliness; and ground and orbit operations concepts.

  11. Gender differences in academic surgery, work-life balance, and satisfaction.

    PubMed

    Baptiste, Dadrie; Fecher, Alison M; Dolejs, Scott C; Yoder, Joseph; Schmidt, C Maximillian; Couch, Marion E; Ceppa, DuyKhanh P

    2017-10-01

    An increasing number of women are pursuing a career in surgery. Concurrently, the percentage of surgeons in dual-profession partnerships is increasing. We sought to evaluate the gender differences in professional advancement, work-life balance, and satisfaction at a large academic center. All surgical trainees and faculty at a single academic medical center were surveyed. Collected variables included gender, academic rank, marital status, family size, division of household responsibilities, and career satisfaction. Student t-test, Fisher's exact test, and chi-square test were used to compare results. There were 127 faculty and 116 trainee respondents (>80% response rate). Respondents were mostly male (77% of faculty, 58% of trainees). Women were more likely than men to be married to a professional (90% versus 37%, for faculty; 82% versus 41% for trainees, P < 0.001 for both) who was working full time (P < 0.001) and were less likely to be on tenure track (P = 0.002). Women faculty were more likely to be primarily responsible for childcare planning (P < 0.001), meal planning (P < 0.001), grocery shopping (P < 0.001), and vacation planning (P = 0.003). Gender-neutral responsibilities included financial planning (P = 0.04) and monthly bill payment (P = 0.03). Gender differences in division of household responsibilities were similar in surgical trainees except for childcare planning, which was a shared responsibility. Women surgeons are more likely to be partnered with a full-time working spouse and to be primarily responsible for managing their households. Additional consideration for improvement in recruitment and retention strategies for surgeons might address barriers to equalizing these gender disparities. Published by Elsevier Inc.

  12. The 1965 Mississippi River flood in Iowa

    USGS Publications Warehouse

    Schwob, Harlan H.; Myers, Richard E.

    1965-01-01

    Flood data compiled for the part of the River along the eastern border include flood discharges, flood elevations, and the frequency of floods of varying magnitudes. They also include the daily or more frequent stage and discharge data for both the Mississippi River and the downstream gaging stations on Iowa tributaries for the period March-May 1965. Sufficient data are presented to permit studied for preparation of plans for protective works and plans for zoning or for flood plain regulation.

  13. Advanced planetary studies

    NASA Technical Reports Server (NTRS)

    1982-01-01

    Results of planetary advanced studies and planning support provided by Science Applications, Inc. staff members to Earth and Planetary Exploration Division, OSSA/NASA, for the period 1 February 1981 to 30 April 1982 are summarized. The scope of analyses includes cost estimation, planetary missions performance, solar system exploration committee support, Mars program planning, Galilean satellite mission concepts, and advanced propulsion data base. The work covers 80 man-months of research. Study reports and related publications are included in a bibliography section.

  14. A Fast Goal Recognition Technique Based on Interaction Estimates

    NASA Technical Reports Server (NTRS)

    E-Martin, Yolanda; R-Moreno, Maria D.; Smith, David E.

    2015-01-01

    Goal Recognition is the task of inferring an actor's goals given some or all of the actor's observed actions. There is considerable interest in Goal Recognition for use in intelligent personal assistants, smart environments, intelligent tutoring systems, and monitoring user's needs. In much of this work, the actor's observed actions are compared against a generated library of plans. Recent work by Ramirez and Geffner makes use of AI planning to determine how closely a sequence of observed actions matches plans for each possible goal. For each goal, this is done by comparing the cost of a plan for that goal with the cost of a plan for that goal that includes the observed actions. This approach yields useful rankings, but is impractical for real-time goal recognition in large domains because of the computational expense of constructing plans for each possible goal. In this paper, we introduce an approach that propagates cost and interaction information in a plan graph, and uses this information to estimate goal probabilities. We show that this approach is much faster, but still yields high quality results.

  15. ISDP salt batch #2 supernate qualification

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peters, T. B.; Nash, C. A.; Fink, S. D.

    2009-01-05

    This report covers the laboratory testing and analyses of the second Integrated Salt Disposition Project (ISDP) salt supernate samples, performed in support of initial radioactive operations of Actinide Removal Process (ARP) and Modular Caustic-Side Solvent Extraction Unit (MCU). Major goals of this work include characterizing Tank 22H supernate, characterizing Tank 41H supernate, verifying actinide and strontium adsorption with a standard laboratory-scale test using monosodium titanate (MST) and filtration, and checking cesium mass transfer behavior for the MCU solvent performance when contacted with the liquid produced from MST contact. This study also includes characterization of a post-blend Tank 49H sample asmore » part of the Nuclear Criticality Safety Evaluation (NCSE). This work was specified by Task Technical Request and by Task Technical and Quality Assurance Plan (TTQAP). In addition, a sampling plan will be written to guide analytical future work. Safety and environmental aspects of the work were documented in a Hazard Assessment Package.« less

  16. 43 CFR 3931.60 - Maps of underground and surface mine workings and in situ surface operations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... workings and in situ surface operations. 3931.60 Section 3931.60 Public Lands: Interior Regulations....60 Maps of underground and surface mine workings and in situ surface operations. Maps of underground... reference to sea level. When required by the BLM, include vertical projections and cross sections in plan...

  17. Integrating Computer Content into Social Work Curricula: A Model for Planning

    ERIC Educational Resources Information Center

    Beaulaurier, Richard L.

    2005-01-01

    While recent CSWE standards focus on the need for including more relevant technological content in social work curricula, they do not offer guidance regarding how it is to be assessed and selected. Social work educators are in need of an analytic model of computerization to help them understand which technologies are most appropriate and relevant…

  18. 30 CFR 57.8520 - Ventilation plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... depots, oil fuel storage depots, hoist rooms, compressors, battery charging stations and explosive... and booster fans including manufacturer's name, type, size, fan speed, blade setting, approximate... sketches showing how ventilation is accomplished in each typical type of working place including the...

  19. 30 CFR 57.8520 - Ventilation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... depots, oil fuel storage depots, hoist rooms, compressors, battery charging stations and explosive... and booster fans including manufacturer's name, type, size, fan speed, blade setting, approximate... sketches showing how ventilation is accomplished in each typical type of working place including the...

  20. 30 CFR 57.8520 - Ventilation plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... depots, oil fuel storage depots, hoist rooms, compressors, battery charging stations and explosive... and booster fans including manufacturer's name, type, size, fan speed, blade setting, approximate... sketches showing how ventilation is accomplished in each typical type of working place including the...

  1. 30 CFR 57.8520 - Ventilation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... depots, oil fuel storage depots, hoist rooms, compressors, battery charging stations and explosive... and booster fans including manufacturer's name, type, size, fan speed, blade setting, approximate... sketches showing how ventilation is accomplished in each typical type of working place including the...

  2. Evaluation of the low-temperature heat-exchanger fouling problem. Phase I report. Literature review and work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Butcher, T.A.

    1983-05-01

    This report describes Phase I of a study of the fouling of condensing heat exchangers in residential oil-fired boiler and furnaces. The first phase consists of a review of available information on soot information in residential systems and the preparation of a work plan for Phase II. In the literature review the effects of burner type, startup and shutdown, time from tuning, fuel quality, combustion chambers, nozzles, and fuel additives are discussed. While data are available on soot emissions with current burners and fuels there are limited data available on advanced burners and degraded fuels with modern burners. The Phasemore » II work will provide an evaluation of the need for the development of advanced burner concepts for oil-fired condensing systems. Planned experimental work includes a furnace draft optimization study, extended fouling tests, a blue flame/yellow flame comparative test, and some degraded fuel teste.« less

  3. FINAL REPORT FOR THE REDUCTION OF CHROME (VI) TO CHROME (III) IN THE SECONDARY WASTE STREAM OF THE EFFLUENT TREATMENT FACILITY

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DUNCAN JB; GUTHRIE MD

    2008-08-29

    This report documents the laboratory results of RPP-PLAN-35958, Test Plan for the Effluent Treatment Facility to Reduce Chrome (VI) to Chrome (III) in the Secondary Waste Stream With the exception of the electrochemical corrosion scans, all work was carried out at the Center for Laboratory Science (CLS) located at the Columbia Basin College. This document summarizes the work carried out at CLS and includes the electrochemical scans and associated corrosion rates for 304 and 316L stainless steel.

  4. High speed precision motion strategies for lightweight structures

    NASA Technical Reports Server (NTRS)

    Book, Wayne J.

    1987-01-01

    Work during the recording period proceeded along the lines of the proposal, i.e., three aspects of high speed motion planning and control of flexible structures were explored: fine motion control, gross motion planning and control, and automation using light weight arms. In addition, modeling the large manipulator arm to be used in experiments and theory has lead to some contributions in that area. These aspects are reported below. Conference, workshop and journal submissions, and presentations related to this work were seven in number, and are listed. Copies of written papers and abstracts are included.

  5. The provision of workplace accommodations following cancer: survivor, provider, and employer perspectives.

    PubMed

    Stergiou-Kita, Mary; Pritlove, Cheryl; van Eerd, Dwayne; Holness, Linn D; Kirsh, Bonnie; Duncan, Andrea; Jones, Jennifer

    2016-06-01

    With improvements in screening, diagnosis, and treatment, the number of persons surviving cancer and staying at or returning to work is increasing. While workplace accommodations optimize workers' abilities to participate in the workforce, there has been little in-depth investigation of the types of accommodations reported to have been provided to cancer survivors and the processes relevant to ensuring their successful implementation. We employed an exploratory qualitative method and conducted 40 semi-structured interviews with three groups: (i) cancers survivors (n = 16), (ii) health/vocational service providers (n = 16), and (iii) employer representatives (n = 8) to explore return to work and accommodation processes, successes, and challenges. An inductive thematic analysis approach was used to analyze the data. Four types of accommodations were recommended: (1) graduated return to work plans and flexible scheduling, (2) modification of work duties and performance expectations, (3) retraining and supports at the workplace, and (4) modification of the physical work environment and/or the provision of adaptive aids/technologies. Processes relevant to ensuring effective accommodations included: (1) developing knowledge about accommodations, (2) employer's ability to accommodate, (3) negotiating reasonable accommodations, (4) customizing accommodations, and (5) implementing and monitoring accommodation plans. Accommodation challenges included: (1) survivors' fears requesting accommodations, (2) developing clear and specific accommodations, (3) difficult to accommodate jobs, and (4) workplace challenges, including strained pre-cancer workplace relationships, insufficient/inflexible workplace policies, employer concerns regarding productivity and precedent setting, and limited modified duties. Accommodations need to be customized and clearly linked to survivors' specific job demands, work context, and available workplace supports. Survivors need to feel comfortable disclosing the need for accommodations. Ongoing communication and monitoring are required to ensure accommodations are implemented and changes made to the return to work plan as required. The provision of appropriate workplace accommodations can enhance survivors' abilities to stay or return to work.

  6. 75 FR 56653 - Suspension of Preparation of Environmental Impact Statement for the George Bush Intercontinental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-16

    ... development needs for the airport. HAS has determined that reevaluation of the Airport Master Plan (AMP.... Based on the results of the AMP, the airfield improvements being analyzed in the EIS included the... that additional planning work is necessary to ensure that the assumptions used in the AMP remain valid...

  7. Implementation plan for HANDI 2000 TWRS master equipment list

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BENNION, S.I.

    This document presents the implementation plan for an additional deliverable of the HANDI 2000 Project. The PassPort Equipment Data module processes include those portions of the COTS PassPort system required to support tracking and management of the Master Equipment List for Lockheed Martin Hanford Company (LMHC) and custom software created to work with the COTS products.

  8. ALS rocket engine combustion devices design and demonstration

    NASA Technical Reports Server (NTRS)

    Arreguin, Steve

    1989-01-01

    Work performed during Phase one is summarized and the significant technical and programmatic accomplishments occurring during this period are documented. Besides a summary of the results, methodologies, trade studies, design, fabrication, and hardware conditions; the following are included: the evolving Maintainability Plan, Reliability Program Plan, Failure Summary and Analysis Report, and the Failure Mode and Effect Analysis.

  9. 38 CFR 21.8080 - Requirement for an individualized written plan of vocational rehabilitation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... CP or VRC will work in consultation with each child for whom a vocational goal is feasible to develop...'s vocational training needs. The CP or VRC will develop this individualized written plan of.... If training is necessary, the CP or VRC will explore a range of possibilities, to include paid and...

  10. 38 CFR 21.8080 - Requirement for an individualized written plan of vocational rehabilitation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... CP or VRC will work in consultation with each child for whom a vocational goal is feasible to develop...'s vocational training needs. The CP or VRC will develop this individualized written plan of.... If training is necessary, the CP or VRC will explore a range of possibilities, to include paid and...

  11. 38 CFR 21.8080 - Requirement for an individualized written plan of vocational rehabilitation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... CP or VRC will work in consultation with each child for whom a vocational goal is feasible to develop...'s vocational training needs. The CP or VRC will develop this individualized written plan of.... If training is necessary, the CP or VRC will explore a range of possibilities, to include paid and...

  12. 38 CFR 21.8080 - Requirement for an individualized written plan of vocational rehabilitation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... CP or VRC will work in consultation with each child for whom a vocational goal is feasible to develop...'s vocational training needs. The CP or VRC will develop this individualized written plan of.... If training is necessary, the CP or VRC will explore a range of possibilities, to include paid and...

  13. Apollo Soyuz mission planning and operations

    NASA Technical Reports Server (NTRS)

    Frank, M. P., III

    1976-01-01

    The paper describes the Apollo Soyuz project from the points of view of working group organization, mission plan definition, joint operations concept, and mission preparation. The concept for joint operations considered contingency situations as well as nominal operations. Preparations for the joint flight included cooperative tracking tests and combined training of the flight crews and mission control personnel.

  14. Administrative and Technical Support for the U.S. Army Medical Research and Development Command Joint Working Group on Medical Chemical Defense

    DTIC Science & Technology

    1989-08-01

    microproces;qor databaAing systems for monitoring project and contract reports and program technology trans. fers, coordinating and providing administratIvo ...The JWGD 3 annual planning process generally included: - Program review by the JWGD’ membership at quarterly meetings, which consisted of the review...Office developed the program planning and budget documents associated with the planning process outlined above. Program project databases and

  15. Modeling, Simulation, and Analysis for State and Local Emergency Planning and Response: Concept of Operations

    DTIC Science & Technology

    2009-01-01

    must be considered for each threat. The Department of Homeland Security (DHS) has defined 15 National Planning Scenarios ( NPSs ), along with a...considered how to incorporate the 15 NPSs and the Target Capabilities List developed by DHS. Finally, we considered the work being done by Dr. Charles...suite of models and other tools hampers effective planning and re- sponse for all hazards, including the NPSs . The ES community has many meth- ods

  16. The Pliocene Citronelle Formation of the Gulf Coastal Plain

    USGS Publications Warehouse

    Matson, George Charlton

    1916-01-01

    In the spring of 1910 the writer, working under the direction of T. Wayland Vaughan, geologist in charge of Coastal Plain investigations, undertook a study of the later Tertiary formations of the Gulf Coastal Plain. According to the plans outlined before the work was begun, the beds that had formerly been grouped under the names Lafayette formation and Grand Gulf formation were to be studied with a view to their possible separation into more satisfactory stratigraphic units that might be correlated with other formations which, on the basis of their fossils, had been assigned to their proper positions in the geologic time scale. The original plan included a study of the post-Vicksburgian Tertiary deposits from western Florida to Mississippi River and correlations with formations previously recognized in Florida, southern Alabama, and Louisiana. This plan was subsequently modified to extend the investigation as far west as Sabine River. The field work was interrupted and the office work was delayed by calls for geologic work in other areas, so that the preparation of the reports could not be begun until the spring of 1914.

  17. SUGGESTIONS FOR OPTIMIZED PLANNING OF MULTIVARIATE MONITORING OF ATMOSPHERIC POLLUTION

    EPA Science Inventory

    Recent work in factor analysis of multivariate data sets has shown that variables with little signal should not be included in the factor analysis. Work also shows that rotational ambiguity is reduced if sources impacting a receptor have both large and small contributions. Thes...

  18. Satisfaction with work-life balance and the career and retirement plans of US oncologists.

    PubMed

    Shanafelt, Tait D; Raymond, Marilyn; Kosty, Michael; Satele, Daniel; Horn, Leora; Pippen, John; Chu, Quyen; Chew, Helen; Clark, William Benton; Hanley, Amy E; Sloan, Jeff; Gradishar, William J

    2014-04-10

    To evaluate satisfaction with work-life balance (WLB) and career plans of US oncologists. The American Society of Clinical Oncology conducted a survey of US oncologists evaluating satisfaction with WLB and career plans between October 2012 and March 2013. The sample included equal numbers of men and women from all career stages. Of 2,998 oncologists contacted, 1,490 (49.7%) returned surveys. From 1,117 oncologists (37.3% of overall sample) completing full-length surveys, we evaluated satisfaction with WLB and career plans among the 1,058 who were not yet retired. The proportion of oncologists satisfied with WLB (n = 345; 33.4%) ranked lower than that reported for all other medical specialties in a recent national study. Regarding career plans, 270 oncologists (26.5%) reported a moderate or higher likelihood of reducing their clinical work hours in the next 12 months, 351 (34.3%) indicated a moderate or higher likelihood of leaving their current position within 24 months, and 273 (28.5%) planned to retire before 65 years of age. Multivariable analyses found women oncologists (odds ratio [OR], 0.458; P < .001) and those who devoted greater time to patient care (OR for each additional hour, 0.977; P < .001) were less likely to be satisfied with WLB. Satisfaction with WLB and burnout were the strongest predictors of intent to reduce clinical work hours and leave current position on multivariable analysis. Satisfaction with WLB among US oncologists seems lower than for other medical specialties. Dissatisfaction with WLB shows a strong relationship with plans to reduce hours and leave current practice. Given the pending US oncologist shortage, additional studies exploring interactions among WLB, burnout, and career satisfaction and their impact on career and retirement plans are warranted.

  19. Satisfaction With Work-Life Balance and the Career and Retirement Plans of US Oncologists

    PubMed Central

    Shanafelt, Tait D.; Raymond, Marilyn; Kosty, Michael; Satele, Daniel; Horn, Leora; Pippen, John; Chu, Quyen; Chew, Helen; Clark, William Benton; Hanley, Amy E.; Sloan, Jeff; Gradishar, William J.

    2014-01-01

    Purpose To evaluate satisfaction with work-life balance (WLB) and career plans of US oncologists. Methods The American Society of Clinical Oncology conducted a survey of US oncologists evaluating satisfaction with WLB and career plans between October 2012 and March 2013. The sample included equal numbers of men and women from all career stages. Results Of 2,998 oncologists contacted, 1,490 (49.7%) returned surveys. From 1,117 oncologists (37.3% of overall sample) completing full-length surveys, we evaluated satisfaction with WLB and career plans among the 1,058 who were not yet retired. The proportion of oncologists satisfied with WLB (n = 345; 33.4%) ranked lower than that reported for all other medical specialties in a recent national study. Regarding career plans, 270 oncologists (26.5%) reported a moderate or higher likelihood of reducing their clinical work hours in the next 12 months, 351 (34.3%) indicated a moderate or higher likelihood of leaving their current position within 24 months, and 273 (28.5%) planned to retire before 65 years of age. Multivariable analyses found women oncologists (odds ratio [OR], 0.458; P < .001) and those who devoted greater time to patient care (OR for each additional hour, 0.977; P < .001) were less likely to be satisfied with WLB. Satisfaction with WLB and burnout were the strongest predictors of intent to reduce clinical work hours and leave current position on multivariable analysis. Conclusion Satisfaction with WLB among US oncologists seems lower than for other medical specialties. Dissatisfaction with WLB shows a strong relationship with plans to reduce hours and leave current practice. Given the pending US oncologist shortage, additional studies exploring interactions among WLB, burnout, and career satisfaction and their impact on career and retirement plans are warranted. PMID:24616305

  20. 40 CFR 35.107 - Work plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Work plans. 35.107 Section 35.107... ASSISTANCE Environmental Program Grants Preparing An Application § 35.107 Work plans. (a) Bases for negotiating work plans. The work plan is negotiated between the applicant and the Regional Administrator and...

  1. 77 FR 29317 - Fiscal Year 2011 Draft Work Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-17

    ... DENALI COMMISSION Fiscal Year 2011 Draft Work Plan AGENCY: Denali Commission. ACTION: Notice... develop proposed work plans for future spending and that the annual Work Plan be published in the Federal... Work Plan for Federal Fiscal Year 2011. DATES: Comments and related material to be received by June 10...

  2. 40 CFR 35.507 - Work plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Work plans. 35.507 Section 35.507... ASSISTANCE Environmental Program Grants for Tribes Preparing An Application § 35.507 Work plans. (a) Bases for negotiating work plans. The work plan is negotiated between the applicant and the Regional...

  3. 40 CFR 35.507 - Work plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Work plans. 35.507 Section 35.507... ASSISTANCE Environmental Program Grants for Tribes Preparing An Application § 35.507 Work plans. (a) Bases for negotiating work plans. The work plan is negotiated between the applicant and the Regional...

  4. 40 CFR 35.107 - Work plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Work plans. 35.107 Section 35.107... ASSISTANCE Environmental Program Grants Preparing An Application § 35.107 Work plans. (a) Bases for negotiating work plans. The work plan is negotiated between the applicant and the Regional Administrator and...

  5. 48 CFR 970.5226-1 - Diversity plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... through (1) the Contractor's work force, (2) educational outreach, (3) community involvement and outreach, (4) subcontracting, (5) economic development (including technology transfer), and (6) the prevention...

  6. 40 CFR 262.102 - What special definitions are included in this subpart?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... implementation of the Environmental Management Plan as measured against policy, objectives and targets... potential hazards to human health or the environment and which must include RCRA “P” wastes, and may include... work practices that both protect human health and the environment from the hazards presented by...

  7. Reading and understanding employee benefit plan financial statements.

    PubMed

    Lee, David C; Van Sertima, Michael A

    2004-03-01

    If your employee benefit plan has more than 100 participants, chances are you've had to work your way through the audited financial statements you're required to include with your Form 5500 filing. These statements contain a wealth of information about the financial health of your plan, and understanding them is an important fiduciary responsibility. To strengthen your grasp of financial statements, this article gives an overview that will make a plan's financial statements more informative, explains their basic structure and provides information on some of the more arcane aspects (such as actuarial tables). While this article focuses on Taft-Hartley (multiemployer) plans, much of it applies to other types of employee benefit plans.

  8. PNNL Apatite Investigation at 100-NR-2 Quality Assurance Project Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fix, N. J.

    In 2004, the U.S. Department of Energy, Fluor Hanford, Inc., Pacific Northwest National Laboratory (PNNL), and the Washington Department of Ecology agreed that the long-term strategy for groundwater remediation at the 100-N Area would include apatite sequestration as the primary treatment, followed by a secondary treatment if necessary. Since then, the agencies have worked together to agree on which apatite sequestration technology has the greatest chance of reducing strontium-90 flux to the Columbia River. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by staff working on the PNNL Apatite Investigation at 100-NR-2more » Project. The plan is designed to be used exclusively by project staff.« less

  9. GEWEX Cloud System Study (GCSS) Working Group on Cirrus Cloud Systems (WG2)

    NASA Technical Reports Server (NTRS)

    Starr, David

    2002-01-01

    Status, progress and plans will be given for current GCSS (GEWEX Cloud System Study) WG2 (Working Group on Cirrus Cloud Systems) projects, including: (a) the Idealized Cirrus Model Comparison Project, (b) the Cirrus Parcel Model Comparison Project (Phase 2), and (c) the developing Hurricane Nora extended outflow model case study project. Past results will be summarized and plans for the upcoming year described. Issues and strategies will be discussed. Prospects for developing improved cloud parameterizations derived from results of GCSS WG2 projects will be assessed. Plans for NASA's CRYSTAL-FACE (Cirrus Regional Study of Tropical Anvils and Layers - Florida Area Cirrus Experiment) potential opportunities for use of those data for WG2 model simulations (future projects) will be briefly described.

  10. Effectiveness of participatory training for the promotion of work-related health and safety among Korean farmers

    PubMed Central

    KIM, Jin-Seok; YOON, Seong-Yong; CHO, Seong-Yong; KIM, Sang-Kyu; CHUNG, In-Sung; SHIN, Hyeong-Soo

    2017-01-01

    This study was conducted to explore the effectiveness of participatory training for promoting farmer’s health and reducing agricultural work-related injuries. Candidates for this study included 595 farmers in 8 rural villages of South Korea. The one-day course participatory training was administered to 217 (36.5%) farmers and included an action-checklist, a good example presentation, and group discussion. The follow-up visit to participants’ houses and farms was performed after 1 to 3 months. A direct interview survey was administered pre- and post-trainings. The total number of proposed action plans for the improvement of working condition was 620. It was observed that 61.5% of action plans (72.2% of short term and 41.3% of long term plans) were completely implemented. In regards to health and safety indices, the proportion of current smokers was reduced from 29.8% to 25.3% in the group that underwent training. The pesticide intoxication was reduced from 16.1% to 4.8% in participants that underwent training. However, the agricultural injury rate was unchanged in both groups. This study reports significant beneficial effects of participatory training in the agriculture sector in Korea. PMID:28484146

  11. [FEMALE SURGEONS SHOULD BE AWARE OF THE IMPORTANCE OF A CLEAR VISION FOR THEIR CAREER AND LIFE PLANS TO ACHIEVE THEIR CAREER DEVELOPMENT.: A SURVEY OF 20 FEMALE SURGEONS AT THE DEPARTMENT OF SURGERY AND ONCOLOGY, KYUSHU UNIVERSITY].

    PubMed

    Nagayoshi, Kinuko; Mori, Hitomi; Kameda, Chizu; Nakamura, Katsuya; Ueki, Takashi; Tanaka, Masao

    2015-05-01

    A shortage of surgeons has been a serious problem in recent years. There is an urgent need to utilize female surgeons who tend to resign because of bearing and raising of children. To examine possible measures to deal with the issue, we performed questionnaire survey about work-life balance and career planning on 20 female surgeons in the Department of Surgery and Oncology, Kyushu University. The response rate was 80.0%. In the 16 respondents, seven were unmarried and nine were married. A large fraction of the respondents recognized the importance of work-life-balance. Female surgeons have many difficulties to continue working with good work-life balance; therefore, understanding and cooperation of both their spouses and coworkers is considered to be necessary. Married female surgeons considered that improvement of the working environment and sufficient family support were more important for good work-life balance compared to those who were unmarried. Female surgeons should recognize the importance of improvement of their environment, including the workplace and the family to continue working with good work-life balance in youth and should have the prospects about their career plan of their own.

  12. Planning for retirement from medicine: a mixed-methods study.

    PubMed

    Pannor Silver, Michelle; Easty, Laura K

    2017-01-01

    Evidence suggests there are important personal and social consequences associated with inadequate retirement planning for physicians. We evaluated whether academic physicians felt satisfied with their retirement planning, and identified obstacles to retirement planning and a set of factors to facilitate retirement planning. We applied a sequential mixed-methods research design to explore and examine factors that facilitate academic physician retirement planning using data collected from multiple sources (including 7 focus groups, an internet-based survey and 23 in-depth interviews). We examined survey results regarding retirement planning satisfaction and preferences for complete versus gradual retirement. We used thematic analysis to examine verbatim transcripts and notes from the focus groups and interviews. Survey data (response rate 51%) indicated that 10% of respondents were very satisfied with their retirement planning and 89.5% would prefer to retire gradually rather than stop work completely. Key barriers to retirement planning that emerged included poor personal financial management, rigid institutional structures and professional norms. Facilitators included financial planning resources for physicians at multiple career stages, opportunities and resources for later-career transitions and later-career mentorship support for intergenerational collaboration, and recognition of retirees. Key findings highlight perceived barriers to retirement planning at various career stages in addition to factors that can enhance physicians' retirement planning, including creating gradual and flexible retirement options, supporting ongoing discussions about financial planning and later career transitions, and fostering a culture that continues to honour and involve retirees. Medical institutions could foster innovative models for later-career transitions from medicine in ways that address physicians' needs at various career stages, support gradual transitions from practice and recognize the value of experienced, capable later-career physicians and retirees.

  13. Planning for retirement from medicine: a mixed-methods study

    PubMed Central

    Pannor Silver, Michelle; Easty, Laura K.

    2017-01-01

    Background: Evidence suggests there are important personal and social consequences associated with inadequate retirement planning for physicians. We evaluated whether academic physicians felt satisfied with their retirement planning, and identified obstacles to retirement planning and a set of factors to facilitate retirement planning. Methods: We applied a sequential mixed-methods research design to explore and examine factors that facilitate academic physician retirement planning using data collected from multiple sources (including 7 focus groups, an internet-based survey and 23 in-depth interviews). We examined survey results regarding retirement planning satisfaction and preferences for complete versus gradual retirement. We used thematic analysis to examine verbatim transcripts and notes from the focus groups and interviews. Results: Survey data (response rate 51%) indicated that 10% of respondents were very satisfied with their retirement planning and 89.5% would prefer to retire gradually rather than stop work completely. Key barriers to retirement planning that emerged included poor personal financial management, rigid institutional structures and professional norms. Facilitators included financial planning resources for physicians at multiple career stages, opportunities and resources for later-career transitions and later-career mentorship support for intergenerational collaboration, and recognition of retirees. Interpretation: Key findings highlight perceived barriers to retirement planning at various career stages in addition to factors that can enhance physicians' retirement planning, including creating gradual and flexible retirement options, supporting ongoing discussions about financial planning and later career transitions, and fostering a culture that continues to honour and involve retirees. Medical institutions could foster innovative models for later-career transitions from medicine in ways that address physicians' needs at various career stages, support gradual transitions from practice and recognize the value of experienced, capable later-career physicians and retirees. PMID:28401128

  14. Using multi-disciplinary strategic master facilities planning for organizations experiencing programmatic re-direction

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Heubach, J.G.; Weimer, W.C.; Bruce, W.A.

    Facility master planning is critical to the future productivity of a laboratory and the quality of worklife for the laboratory staff. For organizations undergoing programmatic re-direction, a master facility planning approach linked to the organization`s strategic planning process is even more important. Major changes in an organization such as programmatic re-direction can significantly impact a broad range of variables which exceed the expertise of traditional planning teams, e.g., capacity variability, work team organization, organizational culture, and work process simplification. By expanding the diversity of the participants of the planning team, there is a greater likelihood that a research organization`s scientific,more » organizational, economic, and employees` needs can be meshed in the strategic plan and facility plan. Recent recommendations from facility planners suggest drawing from diverse fields in building multi-disciplinary planning teams: Architecture, engineering, natural science, social psychology, and strategic planning (Gibson,1993). For organizations undergoing significant operational or culture change, the master facility planning team should also include members with expertise in organizational effectiveness, industrial engineering, human resources, and environmental psychology. A recent planning and design project provides an example which illustrates the use of an expanded multi-disciplinary team engaged in planning laboratory renovations for a research organization undergoing programmatic re-direction. The purpose of the proposed poster session is to present a multi-disciplinary master facility planning process linked to an organization`s strategic planning process or organizational strategies.« less

  15. 7 CFR 23.13 - Plan of Work.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 1 2011-01-01 2011-01-01 false Plan of Work. 23.13 Section 23.13 Agriculture Office of the Secretary of Agriculture STATE AND REGIONAL ANNUAL PLANS OF WORK Regional Program § 23.13 Plan of Work. (a) A Regional Plan of Work for carrying out the programs authorized to be funded under...

  16. Orbital Express Mission Operations Planning and Resource Management using ASPEN

    NASA Technical Reports Server (NTRS)

    Chouinard, Caroline; Knight, Russell; Jones, Grailing; Tran, Daniel

    2008-01-01

    As satellite equipment and mission operations become more costly, the drive to keep working equipment running with less man-power rises.Demonstrating the feasibility of autonomous satellite servicing was the main goal behind the Orbital Express (OE) mission. Planning the satellite mission operations for OE required the ability to create a plan which could be executed autonomously over variable conditions. The Automated-Scheduling and Planning Environment (ASPEN)tool, developed at the Jet Propulsion Laboratory, was used to create the schedule of events in each daily plan for the two satellites of the OE mission. This paper presents an introduction to the ASPEN tool, the constraints of the OE domain, the variable conditions that were presented within the mission, and the solution to operations that ASPEN provided. ASPEN has been used in several other domains, including research rovers, Deep Space Network scheduling research, and in flight operations for the ASE project's EO1 satellite. Related work is discussed, as are the future of ASPEN and the future of autonomous satellite servicing.

  17. Combining qualitative and quantitative spatial and temporal information in a hierarchical structure: Approximate reasoning for plan execution monitoring

    NASA Technical Reports Server (NTRS)

    Hoebel, Louis J.

    1993-01-01

    The problem of plan generation (PG) and the problem of plan execution monitoring (PEM), including updating, queries, and resource-bounded replanning, have different reasoning and representation requirements. PEM requires the integration of qualitative and quantitative information. PEM is the receiving of data about the world in which a plan or agent is executing. The problem is to quickly determine the relevance of the data, the consistency of the data with respect to the expected effects, and if execution should continue. Only spatial and temporal aspects of the plan are addressed for relevance in this work. Current temporal reasoning systems are deficient in computational aspects or expressiveness. This work presents a hybrid qualitative and quantitative system that is fully expressive in its assertion language while offering certain computational efficiencies. In order to proceed, methods incorporating approximate reasoning using hierarchies, notions of locality, constraint expansion, and absolute parameters need be used and are shown to be useful for the anytime nature of PEM.

  18. A major challenge. Entrepreneurship characterizes the work of the Soviet Family Health Association.

    PubMed

    Manuilova, I A

    1991-09-01

    The work of the Soviet Family Health Association (SFHA) is described. Created in January, 1989, the organization boasts 25 state-paid workers, and as of June 1991, membership of 15,000 corporate and individual members. Individual annual membership fee is 5 rubles, and entitles members to counseling and family planning (FP) services. The SFHA works in cooperation with the Commission on Family Planning Problems of the USSR's Academy of Sciences, and has been a member of the International Planned Parenthood Federation (IPPF) since 1990. Association activities include lectures for students, newly-weds, adolescents, and working women on modern contraceptive methods; research on attitude regarding sex, sex behaviors, and the perceived need for effective contraception; clinical trials of contraceptive suitability for women; and the training of doctors in FP and contraceptives. Problems central to the SFHA's operations include insufficient service and examination equipment, a shortage of hard currency, and the small number of FP specialists in the country. Solutions to these obstacles are sought through collaboration with the government, non-governmental organizations in the Soviet Union, and international groups. The SFHA has a series of activities planned for 1991 designed to foster wider acceptance of FP. Increased FP services at industrial enterprises, establishing more FP centers throughout the Soviet Union, and studying FP programs in other countries are among Association targets for the year. Research on and promotion of contraceptives has been virtually stagnant since abortion was declared illegal in 1936. Catching up on these lost decades and remaining self-reliant are challenges to the SPHA.

  19. 7 CFR 4274.326 - Security.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... financial condition, work plan, and management ability. It is the responsibility of the intermediary to make..., including cash and investments, notes receivable from ultimate recipients, and the intermediary's security...

  20. 7 CFR 4274.326 - Security.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... financial condition, work plan, and management ability. It is the responsibility of the intermediary to make..., including cash and investments, notes receivable from ultimate recipients, and the intermediary's security...

  1. 7 CFR 4274.326 - Security.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... financial condition, work plan, and management ability. It is the responsibility of the intermediary to make..., including cash and investments, notes receivable from ultimate recipients, and the intermediary's security...

  2. 7 CFR 4274.326 - Security.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... financial condition, work plan, and management ability. It is the responsibility of the intermediary to make..., including cash and investments, notes receivable from ultimate recipients, and the intermediary's security...

  3. 7 CFR 4274.326 - Security.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... financial condition, work plan, and management ability. It is the responsibility of the intermediary to make..., including cash and investments, notes receivable from ultimate recipients, and the intermediary's security...

  4. The Collaborative School: A Work Environment for Effective Instruction.

    ERIC Educational Resources Information Center

    Smith, Stuart C.; Scott, James J.

    The benefits of a collaborative work setting--including such practices as mutual help, exchange of ideas, joint planning, and participative decision-making--have been consistently confirmed by studies of effective schools and successful businesses. However, teacher isolation remains the norm. Drawing on recent research and educators' firsthand…

  5. Best Laid Plans: How Community College Student Success Courses Work

    ERIC Educational Resources Information Center

    Hatch, Deryl K.; Mardock-Uman, Naomi; Garcia, Crystal E.; Johnson, Mary

    2018-01-01

    Objective: Beyond understanding whether first-year student success interventions in community colleges are effective--for which there is mixed evidence in the literature--this study's purpose was to uncover how they work to realize observed outcomes, including at times unanticipated undesirable outcomes. Method: This qualitative multiple case…

  6. Critical Program Elements in Transition to Adulthood: Comparative Analysis of New York State and the NLTS2

    ERIC Educational Resources Information Center

    Karpur, Arun; Brewer, David; Golden, Thomas

    2014-01-01

    Access to effective and comprehensive transition programming is pivotal to transition of youth with disabilities to work and independent living. Successful programs often blend key ingredients, including individualized educational planning, career development, work experiences in secondary school, and interagency partnerships/collaborations.…

  7. 40 CFR 63.7700 - What work practice standards must I meet?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Iron and Steel Foundries Work..., slitter, or other materials that do not include post-consumer automotive body scrap, post-consumer engine... written plan for the selection and inspection of iron and steel scrap to minimize, to the extent...

  8. 40 CFR 63.7700 - What work practice standards must I meet?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Iron and Steel Foundries Work..., slitter, or other materials that do not include post-consumer automotive body scrap, post-consumer engine... written plan for the selection and inspection of iron and steel scrap to minimize, to the extent...

  9. 40 CFR 63.7700 - What work practice standards must I meet?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Iron and Steel Foundries Work..., slitter, or other materials that do not include post-consumer automotive body scrap, post-consumer engine... written plan for the selection and inspection of iron and steel scrap to minimize, to the extent...

  10. 40 CFR 35.917-1 - Content of facilities plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-1... construction drawings and specifications are to be prepared. This description shall include preliminary engineering data, cost estimates for design and construction of the treatment works, and a schedule for...

  11. The Teratology Society 2007 strategic planning session: a desire to inspire.

    PubMed

    2008-05-01

    On April 18-20, 2007, the Teratology Society held its third strategic planning session (SPS) in San Diego, CA. The purpose of this session was to build on the successful work generated by the previous strategic plans [Nashville, TN 2002 and Cincinnati, OH 1997] and importantly, to provide a path forward to inspire the Society, create deeper connections with members that speak to their individual passion for the science of teratology and to increase the Society's visibility within the larger scientific community. The following summary report provides an overview of the session's pre-work, objective, and discussions. A total of 24 attendees were present at the session. The group included representation from Council, various committees and different members constituencies. This plan and the activities subsequent to the session will provide a path forward for our Society for the next five years.

  12. Solar Schematic

    NASA Technical Reports Server (NTRS)

    1979-01-01

    The home shown at right is specially designed to accommodate solar heating units; it has roof planes in four directions, allowing placement of solar collectors for best exposure to the sun. Plans (bottom) and complete working blueprints for the solar-heated house are being marketed by Home Building Plan Service, Portland, Oregon. The company also offers an inexpensive schematic (center) showing how a homeowner only moderately skilled in the use of tools can build his own solar energy system, applicable to new or existing structures. The schematic is based upon the design of a low-cost solar home heating system built and tested by NASA's Langley Research Center; used to supplement a warm-air heating system, it can save the homeowner about 40 percent of his annual heating bill for a modest investment in materials and components. Home Building Plan Service saved considerable research time by obtaining a NASA technical report which details the Langley work. The resulting schematic includes construction plans and simplified explanations of solar heat collection, collectors and other components, passive heat factors, domestic hot water supply and how to work with local heating engineers.

  13. Ecological Census Techniques - 2nd Edition

    NASA Astrophysics Data System (ADS)

    Sutherland, Edited By William J.

    2006-08-01

    This is an updated version of the best selling first edition, Ecological Census Techniques, with updating, some new chapters and authors. Almost all ecological and conservation work involves carrying out a census or survey. This practically focussed book describes how to plan a census, the practical details and shows with worked examples how to analyse the results. The first three chapters describe planning, sampling and the basic theory necessary for carrying out a census. In the subsequent chapters international experts describe the appropriate methods for counting plants, insects, fish, amphibians, reptiles, mammals and birds. As many censuses also relate the results to environmental variability, there is a chapter explaining the main methods. Finally, there is a list of the most common mistakes encountered when carrying out a census. Gives worked examples and describes practical details The chapter on research planning provides an approach for planning any research, not just those relating to census techniques Latest edition of a very highly-regarded book. Includes new authors, each chapter has been updated, and additional chapters on sampling and designing research programmes have been added

  14. 45 CFR 286.80 - What information on minimum work participation requirements must a Tribe include in its Tribal...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... proposal include, but are not limited to: poverty, unemployment, jobless and job surplus rates; education... following: (1) For each fiscal year covered by the plan, the Tribe's proposed participation rate(s) for all...

  15. 45 CFR 286.80 - What information on minimum work participation requirements must a Tribe include in its Tribal...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... proposal include, but are not limited to: poverty, unemployment, jobless and job surplus rates; education... following: (1) For each fiscal year covered by the plan, the Tribe's proposed participation rate(s) for all...

  16. 45 CFR 286.80 - What information on minimum work participation requirements must a Tribe include in its Tribal...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... proposal include, but are not limited to: poverty, unemployment, jobless and job surplus rates; education... following: (1) For each fiscal year covered by the plan, the Tribe's proposed participation rate(s) for all...

  17. Discussion and Reflection on Several Core Issues in the Grand Canal Heritage Conservation Planning Under the Background of Application for World Heritage

    NASA Astrophysics Data System (ADS)

    Yao, D.; Dai, D. S.; Tang, Y. Z.; Zhu, G. Y.; Chen, X.

    2015-08-01

    At the turn of the century, a series of new heritage concepts have appeared in the area of international cultural heritage protection, such as cultural landscape, cultural route, heritage corridor, heritage canal, which presents the development of people's recognition of cultural heritage. According to The Operational Guidelines for the Implementation of the World Heritage Convention, management planning must be contained in the material used to apply for world heritage. The State Administration of Cultural Heritage designed the mission and work schedule of China's Grand Canal conservation planning in 2008. This research will introduce the working system of China's Grand Canal conservation planning on three levels: city, province and nation. It will also summarize the characteristics of the core technologies in China's Grand Canal conservation planning, including key issues like the identification of the core characteristic of China's Grand Canal, value assessment and determination of the protection scope. Through reviewing, thinking and analyzing the previous accomplishments, the research will offer some advices for the similar world heritage conservation planning after.

  18. Structural dynamics division research and technology accomplishments for fiscal year 1990 and plans for fiscal year 1991

    NASA Technical Reports Server (NTRS)

    Wynne, Eleanor C.

    1991-01-01

    The research accomplishments of the Structural Dynamics Division for F.Y. 1991 are presented. The work is discussed in terms of highlights of accomplishments during the past year and plans for the current year as they relate to 5-year plans and the objectives of each technical area. Included is research on unsteady aerodynamics, helicopter rotors, computational fluid dynamics, oscillations of leading edge flaps of a delta wing, and aircraft wing loads.

  19. 7 CFR 23.6 - Plan of Work.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 1 2011-01-01 2011-01-01 false Plan of Work. 23.6 Section 23.6 Agriculture Office of the Secretary of Agriculture STATE AND REGIONAL ANNUAL PLANS OF WORK State Program § 23.6 Plan of Work. (a) A State Annual Plan of Work for carrying out the programs authorized under title V shall be...

  20. 7 CFR 23.6 - Plan of Work.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Plan of Work. 23.6 Section 23.6 Agriculture Office of the Secretary of Agriculture STATE AND REGIONAL ANNUAL PLANS OF WORK State Program § 23.6 Plan of Work. (a) A State Annual Plan of Work for carrying out the programs authorized under title V shall be...

  1. Education That Works: An Action Plan for the Education of Minorities. Report Summary.

    ERIC Educational Resources Information Center

    Massachusetts Inst. of Technology, Cambridge. Quality Education for Minorities Project.

    This report summarizes the major points of a plan for improving the education of minority students in the United States. The following sections are included in this report: (1) "A Common Future"; (2) "A New Foundation"; (3) "Where We Start"; (4) "Our Goals for the Year 2000"; (5) "Recommended Strategies for Achieving Quality Education for…

  2. Exploring the Potential of Rehearsal via Automatized Structured Tasks versus Face-to-Face Pair Work to Facilitate Pragmatic and Oral Development

    ERIC Educational Resources Information Center

    Sydorenko, Tetyana V.

    2011-01-01

    Past research has uncovered ways to improve communicative competence, including task-based learner-learner interaction (e.g., R. Ellis, 2003) and task planning (e.g., Mochizuki and Ortega, 2008). Teacher-guided planning particularly increases the benefits of learner-learner interaction (Foster and Skehan, 1999). One component of communicative…

  3. Consultants in nhs scotland: a survey of work commitments, remuneration, job satisfaction and retirement plans.

    PubMed

    French, F H; Andrew, J E; Awramenko, M; Coutts, H; Leighton-Beck, L; Mollison, J; Needham, G; Scott, A; Walker, K A

    2004-05-01

    UK consultants have reported working long hours, increased stress and reduced morale. This study set out to elicit consultants' views on flexible working and to gather data on consultants' workloads, remuneration, job satisfaction and retirement plans. As such it is the first comprehensive study of consultants in NHS Scotland. The Information and Statistics Division of the Scottish Executive Health Dept provided a list of consultants working in NHS Scotland Focus groups and interviews informed the design of a postal self-completion, questionnaire. The response ratewas 61%. Almost two-thirds (65%) of respondents felt their workloads were unreasonable and unsustainable and 67% were unable to provide their desired standards of patient care. Two-thirds (67%) did not normally take meal breaks, 63% had insufficient time for outside interests, whilst 44% felt their health was being adversely affected Many (84%) believed that some of their work could be delegated to someone less qualified but 79% agreed that there were insufficient staff to make this possible. The average planned retirement age was 60 years, with 23% describing their plans as definite and 70% as quite or very likely. When asked what might induce them to postpone retirement, 50% cited reduced workload/work intensity. In 2003, a majority of consultants in the UK voted in favour of the new consultant contract. This will improve consultant pay and introduce a standard 40-hour working week, including worked on-call. This should address tow of the main areas of consultant dissatisfaction in NHS Scotland. However, staff shortages will require to be addressed if the contract is to be successfully implemented.

  4. The Financial Impact of Advanced Kidney Disease on Canada Pension Plan and Private Disability Insurance Costs

    PubMed Central

    Manns, Braden; McKenzie, Susan Q.; Au, Flora; Gignac, Pamela M.; Geller, Lawrence Ian

    2017-01-01

    Background: Many working-age individuals with advanced chronic kidney disease (CKD) are unable to work, or are only able to work at a reduced capacity and/or with a reduction in time at work, and receive disability payments, either from the Canadian government or from private insurers, but the magnitude of those payments is unknown. Objective: The objective of this study was to estimate Canada Pension Plan Disability Benefit and private disability insurance benefits paid to Canadians with advanced kidney failure, and how feasible improvements in prevention, identification, and early treatment of CKD and increased use of kidney transplantation might mitigate those costs. Design: This study used an analytical model combining Canadian data from various sources. Setting and Patients: This study included all patients with advanced CKD in Canada, including those with estimated glomerular filtration rate (eGFR) <30 mL/min/m2 and those on dialysis. Measurements: We combined disability estimates from a provincial kidney care program with the prevalence of advanced CKD and estimated disability payments from the Canada Pension Plan and private insurance plans to estimate overall disability benefit payments for Canadians with advanced CKD. Results: We estimate that Canadians with advanced kidney failure are receiving disability benefit payments of at least Can$217 million annually. These estimates are sensitive to the proportion of individuals with advanced kidney disease who are unable to work, and plausible variation in this estimate could mean patients with advanced kidney disease are receiving up to Can$260 million per year. Feasible strategies to reduce the proportion of individuals with advanced kidney disease, either through prevention, delay or reduction in severity, or increasing the rate of transplantation, could result in reductions in the cost of Canada Pension Plan and private disability insurance payments by Can$13.8 million per year within 5 years. Limitations: This study does not estimate how CKD prevention or increasing the rate of kidney transplantation might influence health care cost savings more broadly, and does not include the cost to provincial governments for programs that provide income for individuals without private insurance and who do not qualify for Canada Pension Plan disability payments. Conclusions: Private disability insurance providers and federal government programs incur high costs related to individuals with advanced kidney failure, highlighting the significance of kidney disease not only to patients, and their families, but also to these other important stakeholders. Improvements in care of individuals with kidney disease could reduce these costs. PMID:28491340

  5. The Financial Impact of Advanced Kidney Disease on Canada Pension Plan and Private Disability Insurance Costs.

    PubMed

    Manns, Braden; McKenzie, Susan Q; Au, Flora; Gignac, Pamela M; Geller, Lawrence Ian

    2017-01-01

    Many working-age individuals with advanced chronic kidney disease (CKD) are unable to work, or are only able to work at a reduced capacity and/or with a reduction in time at work, and receive disability payments, either from the Canadian government or from private insurers, but the magnitude of those payments is unknown. The objective of this study was to estimate Canada Pension Plan Disability Benefit and private disability insurance benefits paid to Canadians with advanced kidney failure, and how feasible improvements in prevention, identification, and early treatment of CKD and increased use of kidney transplantation might mitigate those costs. This study used an analytical model combining Canadian data from various sources. This study included all patients with advanced CKD in Canada, including those with estimated glomerular filtration rate (eGFR) <30 mL/min/m 2 and those on dialysis. We combined disability estimates from a provincial kidney care program with the prevalence of advanced CKD and estimated disability payments from the Canada Pension Plan and private insurance plans to estimate overall disability benefit payments for Canadians with advanced CKD. We estimate that Canadians with advanced kidney failure are receiving disability benefit payments of at least Can$217 million annually. These estimates are sensitive to the proportion of individuals with advanced kidney disease who are unable to work, and plausible variation in this estimate could mean patients with advanced kidney disease are receiving up to Can$260 million per year. Feasible strategies to reduce the proportion of individuals with advanced kidney disease, either through prevention, delay or reduction in severity, or increasing the rate of transplantation, could result in reductions in the cost of Canada Pension Plan and private disability insurance payments by Can$13.8 million per year within 5 years. This study does not estimate how CKD prevention or increasing the rate of kidney transplantation might influence health care cost savings more broadly, and does not include the cost to provincial governments for programs that provide income for individuals without private insurance and who do not qualify for Canada Pension Plan disability payments. Private disability insurance providers and federal government programs incur high costs related to individuals with advanced kidney failure, highlighting the significance of kidney disease not only to patients, and their families, but also to these other important stakeholders. Improvements in care of individuals with kidney disease could reduce these costs.

  6. MO-F-CAMPUS-T-05: SQL Database Queries to Determine Treatment Planning Resource Usage

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fox, C; Gladstone, D

    2015-06-15

    Purpose: A radiation oncology clinic’s treatment capacity is traditionally thought to be limited by the number of machines in the clinic. As the number of fractions per course decrease and the number of adaptive plans increase, the question of how many treatment plans a clinic can plan becomes increasingly important. This work seeks to lay the ground work for assessing treatment planning resource usage. Methods: Care path templates were created using the Aria 11 care path interface. Care path tasks included key steps in the treatment planning process from the completion of CT simulation through the first radiation treatment. SQLmore » Server Management Studio was used to run SQL queries to extract task completion time stamps along with care path template information and diagnosis codes from the Aria database. 6 months of planning cycles were evaluated. Elapsed time was evaluated in terms of work hours within Monday – Friday, 7am to 5pm. Results: For the 195 validated treatment planning cycles, the average time for planning and MD review was 22.8 hours. Of those cases 33 were categorized as urgent. The average planning time for urgent plans was 5 hours. A strong correlation between diagnosis code and range of elapsed planning time was as well as between elapsed time and select diagnosis codes was observed. It was also observed that tasks were more likely to be completed on the date due than the time that they were due. Follow-up confirmed that most users did not look at the due time. Conclusion: Evaluation of elapsed planning time and other tasks suggest that care paths should be adjusted to allow for different contouring and planning times for certain diagnosis codes and urgent cases. Additional clinic training around task due times vs dates or a structuring of care paths around due dates is also needed.« less

  7. How State-Funded Home Care Programs Respond to Changes in Medicare Home Health Care: Resource Allocation Decisions on the Front Line

    PubMed Central

    Corazzini, Kirsten

    2003-01-01

    Objective To examine how case managers in a state-funded home care program allocate home care services in response to information about a client's Medicare home health care status, with particular attention to the influence of work environment. Data Sources/Study Setting Primary data collected on 355 case managers and 26 agency directors employed in June 1999 by 26 of the 27 regional agencies administering the Massachusetts Home Care Program for low-income elders. Study Design Data were collected in a cross-sectional survey study design. A case manager survey included measures of work environment, demographics, and factorial survey vignette clients (N=2,054), for which case managers assessed service eligibility levels. An agency director survey included measures of management practices. Data Collection/Extraction Methods Hierarchical linear models estimated the effects of work environment on the relationship between client receipt of Medicare home health care and care plan levels while controlling for case-mix differences in agencies' clients. Principal Findings Case managers did not supplement extant Medicare home health services, but did allocate more generous service plans to clients who have had Medicare home health care services recently terminated. This finding persisted when controlling for case mix and did not vary by work environment. Work environment affected overall care plan levels. Conclusions Study findings indicate systematic patterns of frontline resource allocation shaping the relationships among community-based long-term care payment sources. Further, results illustrate how nonuniform implementation of upper-level initiatives may be partially attributed to work environment characteristics. PMID:14596390

  8. Using co-teaching as a means of facilitating interprofessional collaboration in health and social care.

    PubMed

    Crow, Jayne; Smith, Lesley

    2003-02-01

    In this paper we report the findings of a collaborative enquiry on our experience as tutors co-teaching interprofessional collaboration to a multidisciplinary group of undergraduates. We have different professional/academic backgrounds and the student group included health and social work professionals alongside a number of non-professionals. Our data included our perceptions of the co-teaching experience collected by means of our reflective diaries and reflective conversations during planning and after teaching sessions. We also collected data on student perceptions elicited by means of student evaluations and a student focus group discussion. The data illuminate the process of using co-teaching to role model shared learning and collaborative working within the classroom and highlight the importance of carefully planning co-teaching interaction, including the use of humour, tension, different knowledge bases and styles of debate. The deliberate use of the interactions made possible by coteaching enabled us to create an active learning environment that facilitated the teaching of collaboration. Drawing on our experience, we discuss the considerable potential of using co-teaching to role model collaborative working for multidisciplinary student groups.

  9. Low Cost Benefit Suggestions.

    ERIC Educational Resources Information Center

    Doyel, Hoyt W.; McMillan, John D.

    1980-01-01

    Outlines eight low-cost employee benefits and summarizes their relative advantages. The eight include a stock ownership program, a sick leave pool, flexible working hours, production incentives, and group purchase plans. (IRT)

  10. 75 FR 16188 - Work Reserved for Performance by Federal Government Employees

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-31

    ... team that included representatives from the Chief Acquisition Officers Council and the Chief Human... of critical functions include ``the loss of institutional memory, the inability to be certain whether...? Why or why not? If so, what functions should be included on the list? 6. Human Capital Planning a. How...

  11. Is Virtual Surgical Planning in Orthognathic Surgery Faster Than Conventional Planning? A Time and Workflow Analysis of an Office-Based Workflow for Single- and Double-Jaw Surgery.

    PubMed

    Steinhuber, Thomas; Brunold, Silvia; Gärtner, Catherina; Offermanns, Vincent; Ulmer, Hanno; Ploder, Oliver

    2018-02-01

    The purpose of this study was to measure and compare the working time for virtual surgical planning (VSP) in orthognathic surgery in a largely office-based workflow in comparison with conventional surgical planning (CSP) regarding the type of surgery, staff involved, and working location. This prospective cohort study included patients treated with orthognathic surgery from May to December 2016. For each patient, both CSP with manual splint fabrication and VSP with fabrication of computer-aided design-computer-aided manufacturing splints were performed. The predictor variables were planning method (CSP or VSP) and type of surgery (single or double jaw), and the outcome was time. Descriptive and analytic statistics, including analysis of variance for repeated measures, were computed. The sample was composed of 40 patients (25 female and 15 male patients; mean age, 24.6 years) treated with single-jaw surgery (n = 18) or double-jaw surgery (n = 22). The mean times for planning single-jaw surgery were 145.5 ± 11.5 minutes for CSP and 109.3 ± 10.8 minutes for VSP, and those for planning double-jaw surgery were 224.1 ± 11.2 minutes and 149.6 ± 15.3 minutes, respectively. Besides the expected result that the working time was shorter for single-versus double-jaw surgery (P < .001), it was shown that VSP shortened the working time significantly versus CSP (P < .001). The reduction of time through VSP was relatively stronger for double-jaw surgery (P < .001 for interaction). All differences between CSP and VSP regarding profession (except for the surgeon's time investment) and location were statistically significant (P < .01). The surgeon's time to plan single-jaw surgery was 37.0 minutes for CSP and 41.2 minutes for VSP; for double-jaw surgery, it was 53.8 minutes and 53.6 minutes, respectively. Office-based VSP for orthognathic surgery was significantly faster for single- and double-jaw surgery. The time investment of the surgeon was equal for both methods, and all other steps of the workflow differed significantly compared with CSP. Copyright © 2017 American Association of Oral and Maxillofacial Surgeons. Published by Elsevier Inc. All rights reserved.

  12. The Integration of Climate Science and Collaborative Processes in Building Regional Climate Resiliency in Southeast Florida

    NASA Astrophysics Data System (ADS)

    Jurado, J.

    2016-12-01

    Southeast Florida is widely recognized as one of the most vulnerable regions in the United States to the impacts of climate change, especially sea level rise. Dense urban populations, low land elevations, flat topography, complex shorelines and a porous geology all contribute to the region's challenges. Regional and local governments have been working collaboratively to address shared climate mitigation and adaptation concerns as part of the four-county Southeast Florida Regional Climate Change Compact (Compact). This partnership has emphasized, in part, the use of climate data and the development of advanced technical tools and visualizations to help inform decision-making, improve communications, and guide investments. Prominent work products have included regional vulnerability maps and assessments, a unified sea level rise projection for southeast Florida, the development and application of hydrologic models in scenario planning, interdisciplinary resilient redesign planning workshops, and the development of regional climate indicators. Key to the Compact's efforts has been the engagement and expertise of academic and agency partners, including a formal collaboration between the Florida Climate Institute and the Compact to improve research and project collaborations focused on southeast Florida. This presentation will focus on the collaborative processes and work products that have served to accelerate resiliency planning and investments in southeast Florida, with specific examples of how local governments are using these work products to modernize agency processes, and build support among residents and business leaders.

  13. Network speech systems technology program

    NASA Astrophysics Data System (ADS)

    Weinstein, C. J.

    1981-09-01

    This report documents work performed during FY 1981 on the DCA-sponsored Network Speech Systems Technology Program. The two areas of work reported are: (1) communication system studies in support of the evolving Defense Switched Network (DSN) and (2) design and implementation of satellite/terrestrial interfaces for the Experimental Integrated Switched Network (EISN). The system studies focus on the development and evaluation of economical and endurable network routing procedures. Satellite/terrestrial interface development includes circuit-switched and packet-switched connections to the experimental wideband satellite network. Efforts in planning and coordination of EISN experiments are reported in detail in a separate EISN Experiment Plan.

  14. Agency behind bars: Advance care planning with aging and dying offenders.

    PubMed

    Sanders, Sara; Stensland, Meredith; Juraco, Kim

    2018-01-01

    Aging and terminally ill individuals in U.S. prisons are increasing, making critical the need for appropriate end-of-life (EOL) care and advance care planning (ACP). Applying Bandura's agentic perspective, the authors examined 20 aging/dying offenders' EOL preferences and ACP. Findings include 6 themes: decisions in the shadow of the past, what works best for me, feeling blessed, what is really going on, can anyone be trusted, and turning agency over to someone else. This study provides critical information that will assist professionals who work with dying offenders, as it presents a vivid illustration of their dying process.

  15. Parent/Educator Meetings Can Work for Your Child.

    ERIC Educational Resources Information Center

    Rothschild, Ilene; Bianchi, Julia

    1986-01-01

    Parents have a real opportunity to influence their child's education through participation in the Committee on the Handicapped process which includes referral, evaluation, Individualized Education Program (IEP) planning and review. Specific guidelines for parent participation in this process are discussed, including parent/teacher conferences,…

  16. TRU Waste Management Program. Cost/schedule optimization analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, taskmore » guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less

  17. Breastfeeding works: the role of employers in supporting women who wish to breastfeed and work in four organizations in England.

    PubMed

    Kosmala-Anderson, Joanna; Wallace, Louise M

    2006-09-01

    An important factor influencing duration of breastfeeding is mother's employment status. The main aim of this study was to determine the experience and views of employees (n = 46) in four large public sector organizations concerning breastfeeding support at work. Participants were recruited if they were employed by one of four public service employers and if they were planning to go on maternity leave in the next 6 months, on maternity leave or within 6 months of return from maternity leave. They completed a questionnaire anonymously. Almost 80% of women wanted to continue breastfeeding after returning to work. However, 90% of all respondents were not aware of any employer policy nor offered any information concerning support to enable breastfeeding after returning to work, despite two organizations having a range of maternity- and breastfeeding-related policies in development and some facilities in place. Almost 90% of respondents stated the employers should do more to support breastfeeding. This should include providing pregnant staff with information about breastfeeding support that they should expect and could therefore plan to use, including access to facilities to express and to store breast milk, to enable them to work flexible hours and to take rest breaks during working hours. Recommendations are made for employers.

  18. Tank waste remediation system multi-year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less

  19. Tank waste remediation system multi-year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-09-01

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less

  20. Evaluation of the current landscape of respiratory nurse specialists in the UK: planning for the future needs of patients.

    PubMed

    Yorke, Janelle; Prigmore, Sam; Hodson, Matt; Stonham, Carol; Long, Hannah; Bellhouse, Sarah; Fletcher, Monica; Edwards, Sheila

    2017-01-01

    The National Health Service currently faces significant challenges and must optimise effective workforce planning and management. There are increasing concerns regarding poor workforce planning for respiratory medicine; a greater understanding of the role of respiratory nurse specialists will inform better workforce planning and management. This was a survey study. Two surveys were administered: an organisational-level survey and an individual respiratory nurse survey. There were 148 and 457 respondents to the organisational and individual nurse survey, respectively. Four main themes are presented: (1) breadth of service provided; (2) patient care; (3) work environment; and (4) succession planning. The majority of work conducted by respiratory nurse specialists relates to patient care outside the secondary care setting including supporting self-management in the home, supporting patients on home oxygen, providing hospital-at-home services and facilitating early discharge from acute care environments. Yet, most respiratory nursing teams are employed by secondary care trusts and located within acute environments. There was evidence of multidisciplinary working, although integrated care was not prominent in the free-text responses. High workload was reported with one-quarter of nursing teams short-staffed. Respiratory nurses reported working unpaid extra hours and a lack of administrative support that often took them away from providing direct patient care. Nearly half of the present sample either plan to retire or are eligible for retirement within 10 years. This survey report provides a current snapshot of the respiratory nurse specialist workforce in the UK. This workforce is an ageing population; the results from this survey can be used to inform succession planning and to ensure a viable respiratory nurse specialist workforce in future.

  1. Evaluation of the current landscape of respiratory nurse specialists in the UK: planning for the future needs of patients

    PubMed Central

    Yorke, Janelle; Prigmore, Sam; Hodson, Matt; Stonham, Carol; Long, Hannah; Bellhouse, Sarah; Fletcher, Monica; Edwards, Sheila

    2017-01-01

    Introduction The National Health Service currently faces significant challenges and must optimise effective workforce planning and management. There are increasing concerns regarding poor workforce planning for respiratory medicine; a greater understanding of the role of respiratory nurse specialists will inform better workforce planning and management. Methods This was a survey study. Two surveys were administered: an organisational-level survey and an individual respiratory nurse survey. Results There were 148 and 457 respondents to the organisational and individual nurse survey, respectively. Four main themes are presented: (1) breadth of service provided; (2) patient care; (3) work environment; and (4) succession planning. The majority of work conducted by respiratory nurse specialists relates to patient care outside the secondary care setting including supporting self-management in the home, supporting patients on home oxygen, providing hospital-at-home services and facilitating early discharge from acute care environments. Yet, most respiratory nursing teams are employed by secondary care trusts and located within acute environments. There was evidence of multidisciplinary working, although integrated care was not prominent in the free-text responses. High workload was reported with one-quarter of nursing teams short-staffed. Respiratory nurses reported working unpaid extra hours and a lack of administrative support that often took them away from providing direct patient care. Nearly half of the present sample either plan to retire or are eligible for retirement within 10 years. Conclusions This survey report provides a current snapshot of the respiratory nurse specialist workforce in the UK. This workforce is an ageing population; the results from this survey can be used to inform succession planning and to ensure a viable respiratory nurse specialist workforce in future. PMID:28912954

  2. 7 CFR 1924.5 - Planning development work.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 12 2011-01-01 2011-01-01 false Planning development work. 1924.5 Section 1924.5... Planning development work. (a) Extent of development. For an FO loan, the plans for development will... for development work. The total cash cost of all planned development will be shown on Form FmHA or its...

  3. Plan Execution Interchange Language (PLEXIL)

    NASA Technical Reports Server (NTRS)

    Estlin, Tara; Jonsson, Ari; Pasareanu, Corina; Simmons, Reid; Tso, Kam; Verma, Vandi

    2006-01-01

    Plan execution is a cornerstone of spacecraft operations, irrespective of whether the plans to be executed are generated on board the spacecraft or on the ground. Plan execution frameworks vary greatly, due to both different capabilities of the execution systems, and relations to associated decision-making frameworks. The latter dependency has made the reuse of execution and planning frameworks more difficult, and has all but precluded information sharing between different execution and decision-making systems. As a step in the direction of addressing some of these issues, a general plan execution language, called the Plan Execution Interchange Language (PLEXIL), is being developed. PLEXIL is capable of expressing concepts used by many high-level automated planners and hence provides an interface to multiple planners. PLEXIL includes a domain description that specifies command types, expansions, constraints, etc., as well as feedback to the higher-level decision-making capabilities. This document describes the grammar and semantics of PLEXIL. It includes a graphical depiction of this grammar and illustrative rover scenarios. It also outlines ongoing work on implementing a universal execution system, based on PLEXIL, using state-of-the-art rover functional interfaces and planners as test cases.

  4. Coordinating robot motion, sensing, and control in plans. LDRD project final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Xavier, P.G.; Brown, R.G.; Watterberg, P.A.

    1997-08-01

    The goal of this project was to develop a framework for robotic planning and execution that provides a continuum of adaptability with respect to model incompleteness, model error, and sensing error. For example, dividing robot motion into gross-motion planning, fine-motion planning, and sensor-augmented control had yielded productive research and solutions to individual problems. Unfortunately, these techniques could only be combined by hand with ad hoc methods and were restricted to systems where all kinematics are completely modeled in planning. The original intent was to develop methods for understanding and autonomously synthesizing plans that coordinate motion, sensing, and control. The projectmore » considered this problem from several perspectives. Results included (1) theoretical methods to combine and extend gross-motion and fine-motion planning; (2) preliminary work in flexible-object manipulation and an implementable algorithm for planning shortest paths through obstacles for the free-end of an anchored cable; (3) development and implementation of a fast swept-body distance algorithm; and (4) integration of Sandia`s C-Space Toolkit geometry engine and SANDROS motion planer and improvements, which yielded a system practical for everyday motion planning, with path-segment planning at interactive speeds. Results (3) and (4) have either led to follow-on work or are being used in current projects, and they believe that (2) will eventually be also.« less

  5. ATF Neutron Irradiation Program Technical Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Geringer, J. W.; Katoh, Yutai

    The Japan Atomic Energy Agency (JAEA) under the Civil Nuclear Energy Working Group (CNWG) is engaged in a cooperative research effort with the U.S. Department of Energy (DOE) to explore issues related to nuclear energy, including research on accident-tolerant fuels and materials for use in light water reactors. This work develops a draft technical plan for a neutron irradiation program on the candidate accident-tolerant fuel cladding materials and elements using the High Flux Isotope Reactor (HFIR). The research program requires the design of a detailed experiment, development of test vehicles, irradiation of test specimens, possible post-irradiation examination and characterization ofmore » irradiated materials and the shipment of irradiated materials to JAEA in Japan. This report discusses the technical plan of the experimental study.« less

  6. Educational Decentralization and Behavior Change Needs in Indonesia. Working Paper.

    ERIC Educational Resources Information Center

    Cohen, Joseph

    This working paper examines behavior change as a key element in creating an enabling environment to sustain educational reform in Indonesia. It recommends elevating the importance of a formalized behavior change framework and methodology so that future plans for educational reform in Indonesia will include social marketing as a planned…

  7. Increasing College-Going Self-Efficacy of Rural Fifth Grade Students

    ERIC Educational Resources Information Center

    Jensen, Michelle L.

    2013-01-01

    The work of professional school counselors in helping students achieve academically and increasing their college-going rates is significant work. Research indicates that high school and even middle school is often too late for students to begin the process of college and career planning. This dissertation includes two manuscripts. The first…

  8. Water Conservation and Reuse. Instructor Guide. Working for Clean Water: An Information Program for Advisory Committees.

    ERIC Educational Resources Information Center

    Pennsylvania State Univ., Middletown. Inst. of State and Regional Affairs.

    Described is a learning session on water conservation intended for citizen advisory groups interested in water quality planning. Topics addressed in this instructor's manual include water conservation needs, benefits, programs, technology, and problems. These materials are components of the Working for Clean Water Project. (Author/WB)

  9. 48 CFR 52.222-8 - Payrolls and Basic Records.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... and mechanics working at the site of the work. Such records shall contain the name, address, and... paragraph (d) of the clause entitled Davis-Bacon Act, that the wages of any laborer or mechanic include the... that the plan or program has been communicated in writing to the laborers or mechanics affected, and...

  10. 48 CFR 52.222-8 - Payrolls and Basic Records.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... and mechanics working at the site of the work. Such records shall contain the name, address, and... paragraph (d) of the clause entitled Davis-Bacon Act, that the wages of any laborer or mechanic include the... that the plan or program has been communicated in writing to the laborers or mechanics affected, and...

  11. ESL Teacher Training: Worksheets for Teachers of Adult Migrants.

    ERIC Educational Resources Information Center

    Dickie, J. A.; Lewis, Marilyn

    Instructional materials are presented for teachers working with classes of adult migrants at technical institutes, high schools, or community centers in New Zealand. The materials are planned to be used in group training sessions, and the handbook includes suggestions for discussions, group tasks, and individual work. The handbook may be used for…

  12. Reclaiming and Reimagining Macro Social Work Education: A Collective Biography

    ERIC Educational Resources Information Center

    Netting, F. Ellen; O'Connor, Mary Katherine; Cole, Portia L.; Hopkins, Karen; Jones, Jenny L.; Kim, Youngmi; Leisey, Monica; Mulroy, Elizabeth A.; Rotabi, Karen Smith; Thomas, M. Lori; Weil, Marie O.; Wike, Traci L.

    2016-01-01

    The authors focus on a collective biography of 12 women social work educators, all either tenured or in tenure lines, from five different universities at the time of the study. The participants represent several aspects of macro practice including administration, planning, community practice, and policy. Beginning with reflections about coming…

  13. NOAA Photo Library - Meet the Photographers/Becky Dayhuff

    Science.gov Websites

    spent most of her adult life writing, volunteering, and working on environmental and animal protection , including slide programs of her wildlife photography from Africa, to thousands of school children and civic worked with low income children. While her lesson plans emphasized the importance of reading, writing

  14. Distributed problem solving by pilots and dispatchers

    NASA Technical Reports Server (NTRS)

    Orasanu, Judith; Wich, Mike; Fischer, Ute; Jobe, Kim; Mccoy, Elaine; Beatty, Roger; Smith, Phil

    1993-01-01

    The study addressed the following question: Are flight planning problems solved differently by PILOTS and DISPATCHERS when they work alone versus when they work together? Aspect of their performance that were of interest include the following: Problem perception and definition; Problem solving strategies and information use; Options considered; Solution and rational; and errors.

  15. Technology in Education, 1988. Working Papers of Planning and Development Research. Working Paper 88-2.

    ERIC Educational Resources Information Center

    Sharon, Donna

    This report on technology in education has been prepared, primarily for TVOntario staff, to highlight new and growing educational applications and to summarize recent evaluations of earlier application efforts. The descriptions of trends and developments are classified by media format. Representative applications of the media include: (1)…

  16. 7 CFR Exhibit F to Subpart A of... - Payment Bond

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REGULATIONS CONSTRUCTION AND REPAIR Planning and Performing Construction and Other Development Pt. 1924, Subpt... _______ day of ________19__, a copy of which is hereto attached and made a part hereof for the construction of... connection with the construction of such WORK, and for all labor cost incurred in such WORK including that by...

  17. Work Experience Employability Skills, Junior High.

    ERIC Educational Resources Information Center

    Mims, Murry; And Others

    Educators have long recognized the need for schools to train students adequately for the world of work. This training includes both the necessary technical skills and employability skills. This document, the Employability Skills Guide, is Duval County Schools' part of such a plan to meet this need. The performance objectives utilized in this guide…

  18. Parenting and female dermatologists' perceptions of work-life balance.

    PubMed

    Mattessich, S; Shea, K; Whitaker-Worth, D

    2017-09-01

    Women in medicine may feel pressure to choose between the competing demands of career goals and being a dedicated spouse and parent. The purpose of this survey study is to report on the current opinions of female dermatologists with regard to family planning, maternity leave, and career success. We surveyed 183 members of the Women's Dermatologic Society using a 13-question survey that was approved for distribution by the institutional review board committee of the University of Connecticut Health Center. We found that women were most likely to have children while they were residents (51%), despite the fact that residents were more likely to report barriers to childbearing at this career stage. These barriers included length of maternity leave, appearing less committed to residency responsibilities compared with peers, and inadequate time and privacy to breast feed. Strategies to achieve a work-life balance included hiring in-home help and working part-time. Of note, many women commented on the need for more family planning resources at work. Thought should be given to future administrative strategies that can lessen the burden of parents who are dermatologists and have academic ambitions.

  19. Waking the health plan giant: Group Health Cooperative stops counting sheep and starts counting key tobacco indicators.

    PubMed

    McAfee, T

    1998-01-01

    Implementing a comprehensive approach to decreasing tobacco use in a large health plan requires hard work and commitment on the part of many individuals. We found that major organisational change can be accomplished and sustained. Keys to our success included our decision to remove access barriers to our cessation programmes (including cost); obtaining top leadership buy-in; identifying accountable individuals who owned responsibility for change; measuring key processes and outcomes; and finally keeping at it tenaciously through multiple cycles of improvement.

  20. Revitalizing communities together: the shared values, goals, and work of education, urban planning, and public health.

    PubMed

    Cohen, Alison Klebanoff; Schuchter, Joseph W

    2013-04-01

    Inequities in education, the urban environment, and health co-exist and mutually reinforce each other. Educators, planners, and public health practitioners share commitments to place-based, participatory, youth-focused, and equitable work. They also have shared goals of building community resilience, social capital, and civic engagement. Interdisciplinary programs that embody these shared values and work towards these shared goals are emerging, including school-based health centers, full-service community schools, community health centers, Promise Neighborhoods, and Choice Neighborhoods. The intersection of these three fields represents an opportunity to intervene on social determinants of health. More collaborative research and practice across public health, education, and planning should build from the shared values identified to continue to address these common goals.

  1. An Internationally Coordinated Science Management Plan for Samples Returned from Mars

    NASA Astrophysics Data System (ADS)

    Haltigin, T.; Smith, C. L.

    2015-12-01

    Mars Sample Return (MSR) remains a high priority of the planetary exploration community. Such an effort will undoubtedly be too large for any individual agency to conduct itself, and thus will require extensive global cooperation. To help prepare for an eventual MSR campaign, the International Mars Exploration Working Group (IMEWG) chartered the international Mars Architecture for the Return of Samples (iMARS) Phase II working group in 2014, consisting of representatives from 17 countries and agencies. The overarching task of the team was to provide recommendations for progressing towards campaign implementation, including a proposed science management plan. Building upon the iMARS Phase I (2008) outcomes, the Phase II team proposed the development of an International MSR Science Institute as part of the campaign governance, centering its deliberations around four themes: Organization: including an organizational structure for the Institute that outlines roles and responsibilities of key members and describes sample return facility requirements; Management: presenting issues surrounding scientific leadership, defining guidelines and assumptions for Institute membership, and proposing a possible funding model; Operations & Data: outlining a science implementation plan that details the preliminary sample examination flow, sample allocation process, and data policies; and Curation: introducing a sample curation plan that comprises sample tracking and routing procedures, sample sterilization considerations, and long-term archiving recommendations. This work presents a summary of the group's activities, findings, and recommendations, highlighting the role of international coordination in managing the returned samples.

  2. [Activities of System Studies and Simulation, Inc.

    NASA Technical Reports Server (NTRS)

    2004-01-01

    Contents include the following: 1. Launch Vehicle Interface Work Performed: a. S3 provided to KSC the new launch inclination targets needed for the April '04 launch date. 2. Prelaunch operations work performed: a. S3 updated the staffing plan for MSFC on-console personnel\\during the Final Countdown prior to launch. 3. Software Assessment Work Performed: a. S3 evaluated and recommended approval for Program Control Board (PCB) proposed change 649 for ground software changes, as well as change 650 and 650A for Stored Program Commands. 4. Education and Public Outreach Work Performed: a. S3 continues to coordinate the effort for the design and fabrication of scale models of the GP-3 for use at the launch site, education forums, and management/technical briefings. S3 also prepared a Change Request for additional funds needed for fabrication of additional scale models. S3 drafted the planned uses of these models, including the possibility of participation in the Boston, MA showings of the traveling Einstein Exhibit. 5. Program Management Support Work Performed: a. S3 prepared the input for and closed three MSFC Centerwide Action Item Tracking Systems (CAITS) actions during this period.

  3. A Planned Preventive Maintenance Program. A Handbook for Chief Business Officers and Supervisors of Maintenance with Suggestions on Maintenance for Consideration by Presidents of Higher Institutions.

    ERIC Educational Resources Information Center

    Daniel, Clarence H.

    This handbook explains planned preventive maintenance program, which is an operational system of maintenance designed to increase the effectiveness of the maintenance staff and the use of maintenance funds through efficient scheduling of inspections and follow-through of work to be performed. Sections are included for the chief administrative…

  4. Supplementing the Digitized Sky Survey for UV-Mission Planning

    NASA Technical Reports Server (NTRS)

    McLean, Brian

    2004-01-01

    The Space Telescope Science Institute worked on a project to augment the Digitized Sky Survey archive by completing the scanning and processing of the POSS-I blue survey. This will provide an additional valuable resource to support UV-mission planning. All of the data will be made available through the NASA optical/UV archive (MAST) at STScI. The activities completed during this project are included.

  5. Industry Studies 2002: Construction

    DTIC Science & Technology

    2002-01-01

    Jacksonville, FL Rotary Club of San Juan, San Juan, PR Tren Urbano Subway Project, San Juan, PR U.S. Army South, San Juan, PR U.S. Coast Guard Housing Project...Bechtel Corporation (IBM Plant Construction Site), Shanghai American Chamber of Commerce, Shanghai Urban Planning Exhibit, Shanghai 3 INTRODUCTION The...of states have or are working on a statewide or agency-wide privatization plan , including California, Maryland, Massachusetts, Michigan and

  6. Fuels planning: science synthesis and integration; social issues fact sheet 01: Developing personal responsibility for fuels reduction: Building a successful program to engage property owners

    Treesearch

    Rocky Mountain Research Station USDA Forest Service

    2004-01-01

    In the course of work as a land manager, you will no doubt be involved in developing programs to achieve various objectives, including the improvement of fuels management on private lands. This fact sheet describes six steps that will help you plan and conduct a successful program.

  7. Using a Theory of Action to Develop Performance Indicators to Measure Progress toward a SIMR

    ERIC Educational Resources Information Center

    Schiller, Ellen; Hayes, Susan; Nagle, Katherine

    2015-01-01

    This white paper offers an approach for using a theory of action as an outline to develop the SSIP [State Systemic Improvement Plan] Phase II evaluation questions and plan that will guide the SSIP work in Phase III and beyond. Key areas of focus include generating evaluation questions at each level of outcomes, identifying essential steps and…

  8. Conceptual Model of Climate Change Impacts at LANL

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dewart, Jean Marie

    Goal 9 of the LANL FY15 Site Sustainability Plan (LANL 2014a) addresses Climate Change Adaptation. As part of Goal 9, the plan reviews many of the individual programs the Laboratory has initiated over the past 20 years to address climate change impacts to LANL (e.g. Wildland Fire Management Plan, Forest Management Plan, etc.). However, at that time, LANL did not yet have a comprehensive approach to climate change adaptation. To fill this gap, the FY15 Work Plan for the LANL Long Term Strategy for Environmental Stewardship and Sustainability (LANL 2015) included a goal of (1) establishing a comprehensive conceptual modelmore » of climate change impacts at LANL and (2) establishing specific climate change indices to measure climate change and impacts at Los Alamos. Establishing a conceptual model of climate change impacts will demonstrate that the Laboratory is addressing climate change impacts in a comprehensive manner. This paper fulfills the requirement of goal 1. The establishment of specific indices of climate change at Los Alamos (goal 2), will improve our ability to determine climate change vulnerabilities and assess risk. Future work will include prioritizing risks, evaluating options/technologies/costs, and where appropriate, taking actions. To develop a comprehensive conceptual model of climate change impacts, we selected the framework provided in the National Oceanic and Atmospheric Administration (NOAA) Climate Resilience Toolkit (http://toolkit.climate.gov/).« less

  9. Enacting 'team' and 'teamwork': using Goffman's theory of impression management to illuminate interprofessional practice on hospital wards.

    PubMed

    Lewin, Simon; Reeves, Scott

    2011-05-01

    Interprofessional teamwork is widely advocated in health and social care policies. However, the theoretical literature is rarely employed to help understand the nature of collaborative relations in action or to critique normative discourses of teamworking. This paper draws upon Goffman's (1963) theory of impression management, modified by Sinclair (1997), to explore how professionals 'present' themselves when interacting on hospital wards and also how they employ front stage and backstage settings in their collaborative work. The study was undertaken in the general medicine directorate of a large NHS teaching hospital in England. An ethnographic approach was used, including interviews with 49 different health and social care staff and participant observation of ward-based work. These observations focused on both verbal and non-verbal interprofessional interactions. Thematic analysis of the data was undertaken. The study findings suggest that doctor-nurse relationships were characterised by 'parallel working', with limited information sharing or effective joint working. Interprofessional working was based less on planned, 'front stage' activities, such as wards rounds, than on ad hoc backstage opportunistic strategies. These backstage interactions, including corridor conversations, allowed the appearance of collaborative 'teamwork' to be maintained as a form of impression management. These interactions also helped to overcome the limitations of planned front stage work. Our data also highlight the shifting 'ownership' of space by different professional groups and the ways in which front and backstage activities are structured by physical space. We argue that the use of Sinclair's model helps to illuminate the nature of collaborative interprofessional relations within an acute care setting. In such settings, the notion of teamwork, as a form of regular interaction and with a shared team identity, appears to have little relevance. This suggests that interventions to change interprofessional practice need to include a focus on ad hoc as well as planned forms of communication. Copyright © 2011 Elsevier Ltd. All rights reserved.

  10. Biologically-inspired robust and adaptive multi-sensor fusion and active control

    NASA Astrophysics Data System (ADS)

    Khosla, Deepak; Dow, Paul A.; Huber, David J.

    2009-04-01

    In this paper, we describe a method and system for robust and efficient goal-oriented active control of a machine (e.g., robot) based on processing, hierarchical spatial understanding, representation and memory of multimodal sensory inputs. This work assumes that a high-level plan or goal is known a priori or is provided by an operator interface, which translates into an overall perceptual processing strategy for the machine. Its analogy to the human brain is the download of plans and decisions from the pre-frontal cortex into various perceptual working memories as a perceptual plan that then guides the sensory data collection and processing. For example, a goal might be to look for specific colored objects in a scene while also looking for specific sound sources. This paper combines three key ideas and methods into a single closed-loop active control system. (1) Use high-level plan or goal to determine and prioritize spatial locations or waypoints (targets) in multimodal sensory space; (2) collect/store information about these spatial locations at the appropriate hierarchy and representation in a spatial working memory. This includes invariant learning of these spatial representations and how to convert between them; and (3) execute actions based on ordered retrieval of these spatial locations from hierarchical spatial working memory and using the "right" level of representation that can efficiently translate into motor actions. In its most specific form, the active control is described for a vision system (such as a pantilt- zoom camera system mounted on a robotic head and neck unit) which finds and then fixates on high saliency visual objects. We also describe the approach where the goal is to turn towards and sequentially foveate on salient multimodal cues that include both visual and auditory inputs.

  11. 7 CFR 1717.604 - Long-range engineering plans and construction work plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...

  12. 7 CFR 1717.604 - Long-range engineering plans and construction work plans.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 11 2013-01-01 2013-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...

  13. 7 CFR 1717.604 - Long-range engineering plans and construction work plans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 11 2014-01-01 2014-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...

  14. 7 CFR 1717.604 - Long-range engineering plans and construction work plans.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 11 2012-01-01 2012-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...

  15. 7 CFR 1717.604 - Long-range engineering plans and construction work plans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 11 2011-01-01 2011-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...

  16. Private pensions. A less taxing alternative.

    PubMed

    Schalkle, B L; Dyrhaug, K J

    1992-07-01

    The results of the Joneses' coordinated retirement income and estate planning strategies are as follows: 1. The Joneses maximized their estate assets by converting an inefficient estate asset (the qualified retirement plan) into an efficient estate asset (the income-tax-free death benefit) without jeopardizing their current or future standard of living or the value passed on to their heirs. This allows them to satisfy their conflicting objectives. 2. They added flexibility to their future family gifting plans by providing themselves a secure income for the rest of their lives. 3. They fulfilled their desire to protect their family against government confiscation of retirement plan assets in the event they both die before using all their qualified retirement assets. This private pension plan strategy is obviously not available to everyone, nor is it appropriate for everyone. This solution worked well for this client, but everyone's situation is unique. Before creating such a plan, it is important to review all the factors in an individual's financial picture, including financial and retirement objectives and investment risk tolerance. Although this is an innovative idea that may solve a pension dilemma, it should not be used in place of qualified retirement plans but, rather, used in conjunction with such a plan. The private pension plan does not work with all insurance products or all insurance companies. Choosing the right company and product for each client requires care and expertise.

  17. Indoor Air Quality Manual.

    ERIC Educational Resources Information Center

    Baldwin Union Free School District, NY.

    This manual identifies ways to improve a school's indoor air quality (IAQ) and discusses practical actions that can be carried out by school staff in managing air quality. The manual includes discussions of the many sources contributing to school indoor air pollution and the preventive planning for each including renovation and repair work,…

  18. School, Work and Family Planning. Interim Impacts in Project Redirection.

    ERIC Educational Resources Information Center

    Polit, Denise F.; And Others

    Project Redirection was designed to help pregnant and parenting adolescents progress toward eventual self-sufficiency by linking them with community agencies and volunteers at four geographically and ethnically diverse sites in the United States. Distinctive features of the program include: (1) a broad scope of services including employability…

  19. Managing Your Reading Program--A Total System.

    ERIC Educational Resources Information Center

    Hales, Carma M.; Jones, Maurine E.

    This guide provides specific information on designing and implementing a reading program. The guide is divided into the following six parts: (1) "Planning for Instruction," including sections on setting ideal goals, establishing a "reality base," and organizing a work flow; (2) "Content Organization," including sections on the structure of…

  20. 75 FR 57782 - Registration Review; Pesticide Dockets Opened for Review and Comment; Amended Work Plan for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-22

    ... perform its intended function without unreasonable adverse effects on human health or the environment... and other knowledge, including its effects on human health and the environment. This document also... range of stakeholders including environmental, human health, farmworker, and agricultural advocates; the...

  1. 77 FR 23451 - Funding Opportunity Title; Risk Management Education and Outreach Partnerships Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-19

    ... DEPARTMENT OF AGRICULTURE Federal Crop Insurance Corporation Funding Opportunity Title; Risk.... Content and Form of Application Submission The title of the application must include the (1) RMA Region... Plan includes a list of all partners working on the project, their titles, and how they will be...

  2. Digitalization in the space sector - The Guatemalan experience

    NASA Astrophysics Data System (ADS)

    Robles, Jorge Rodolfo

    The present status of Guatemalan satellite- and communications-related technology is discussed, including recent changes and plans for future work. The international telecommunications capacity and the operations of Guatel are emphasized. Plans for the digitalization of the land-based station Quetzal I and the addition of a second station are described. The equipment and configurations of the digital conversion are specified. The anticipated capacity of the Quetzal I station will be 300,000 telephone lines and the technology used will integrate international digital service for both transmission and exchange. The capacity of the second land station includes 1500 telephone channels, 30 IBS channels, and television transmission and reception. A plan for regional cooperation is proposed to improve the utilization of satellite technology in Central America.

  3. Report of the NASA working group on tropospheric program planning

    NASA Technical Reports Server (NTRS)

    Seinfeld, J. H.; Allario, F.; Bandeen, W. R.; Chameides, W. L.; Davis, D. D.; Hinkley, E. D.; Stewart, R. W.

    1981-01-01

    Increased understanding of the chemical phenomena occurring in the troposphere was the research goal. Emphasis was placed on tropospheric impact on environmental quality, including public health, agriculture, climate, and weather.

  4. Beat Procrastination--Now!

    ERIC Educational Resources Information Center

    Bakunas, Boris

    2001-01-01

    Procrastinators harbor unrealistic attitudes that promote needless delay and engender obstructive feelings such as performance anxiety, low frustration tolerance, and resentment. Common procrastination pitfalls include escapism, overpreparation, overwork, overcommitment, poor work conditions, and rationalization. Planning and prioritizing helps…

  5. VTrans climate change action plan

    DOT National Transportation Integrated Search

    2008-06-01

    VTrans is working closely with other state agencies, including the Agency of Natural Resources (ANR) to review and implement the transportation-related recommendations from the 2007 Governors Commission on Climate Change (GCCC) final report. The r...

  6. CEC Council Sessions

    EPA Pesticide Factsheets

    Each year, the North American Ministers to the Commission for Environmental Cooperation meet at least once for the CEC Council Session to set the CEC’s overall direction, including budget, and activities pursued through the cooperative work plan.

  7. The effect of the federal Family and Medical Leave Act upon employee benefits.

    PubMed

    Brislin, J A

    1993-09-01

    FMLA will substantially influence the administration of employee benefits. The plan sponsor, trustees, plan administrator and collective bargaining parties must make a number of policy decisions. These include employer reporting and contribution procedures, settlement of eligibility questions, delinquency procedures, coordination with COBRA, substitution of vacation and sick leave rights and procedures, restrictions on participants working during leave, procedures for the non-forfeiture of accrued benefits and restoration of benefits. After the policy decisions are made and the procedures are established, the proper notices and caveats must be communicated to plan participants, and the plan must update the SPD. Each of the policy decisions, administrative procedures and participant communications must be carefully thought out before implementation. Plan sponsors, trustees and plan administrators should seek the help, advice and assistance of the plan's professional advisers.

  8. Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase IV

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    R. P. Wells

    2006-11-14

    This Phase IV Remedial Design/Remedial Action Work Plan addresses the remediation of areas with the potential for UXO at the Idaho National Laboratory. These areas include portions of the Naval Proving Ground, the Arco High-Altitude Bombing Range, and the Twin Buttes Bombing Range. Five areas within the Naval Proving Ground that are known to contain UXO include the Naval Ordnance Disposal Area, the Mass Detonation Area, the Experimental Field Station, The Rail Car Explosion Area, and the Land Mine Fuze Burn Area. The Phase IV remedial action will be concentrated in these five areas. For other areas, such as themore » Arco High-Altitude Bombing Range and the Twin Buttes Bombing Range, ordnance has largely consisted of sand-filled practice bombs that do not pose an explosion risk. Ordnance encountered in these areas will be addressed under the Phase I Operations and Maintenance Plan that allows for the recovery and disposal of ordnance that poses an imminent risk to human health or the environment.« less

  9. Integrating MRP (materiel requirements planning) into modern business.

    PubMed

    Lunn, T

    1994-05-01

    Time is the commodity of the '90s. Therefore, we all must learn how to use our manufacturing systems to shorten lead time and increase customer satisfaction. The objective of this article is to discuss practical ways people integrate the techniques of materiel requirements planning (MRP) systems with just-in-time (JIT) execution systems to increase customer satisfaction. Included are examples of new ways people use MRP systems to exemplify the process of continuous improvement--multiple items on work orders, consolidated routings, flexing capacity, and other new developments. Ways that successful companies use MRP II for planning and JIT for execution are discussed. There are many examples of how to apply theory to real life situations and a discussion of techniques that work to keep companies in the mode of continuous improvement. Also included is a look at hands-on, practical methods people use to achieve lead time reduction and simplify bills of material. Total quality management concepts can be applied to the MRP process itself. This in turn helps people improve schedule adherence, which leads to customer satisfaction.

  10. The Development and Implementation of a School-to-Work Apprenticeship Model at a Technical Career Center.

    ERIC Educational Resources Information Center

    Kraft, James A.

    A business and education partnership model addressed a shortage of local, qualified, entry-level, technically skilled workers through a school-to-work apprenticeship program at the North Montco Technical Career Center in Lansdale, Pennsylvania. The research-based solution plan of the Pennsylvania Youth Apprenticeship Program (PYAP) included three…

  11. EDIN-USVI Clean Energy Quarterly: Volume 1, Issue 3, September 2011 (Newsletter)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2011-09-01

    This quarterly newsletter provides timely news and information about the plans and progress of the Energy Development in Island Nations-U.S. Virgin Islands pilot project, including significant events and milestones, work undertaken by each of the five working groups, and project-related renewable energy and energy efficiency educational outreach and technology deployment efforts.

  12. The Paper Beam: Hands-On Design for Team Work Experience of Freshman in Engineering

    ERIC Educational Resources Information Center

    Kalkani, Efrossini C.; Boussiakou, Iris K.; Boussiakou, Leda G.

    2005-01-01

    The present research refers to the assigning of a hands-on group project to freshman engineering students, evaluating their performance, and deriving conclusions on student benefits and educational advances. The research procedure included action plans for the instructor and the students, instructions to the students on performing the work,…

  13. 7 CFR 23.13 - Plan of Work.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... multi-State organizations or bodies for those activities of the Regional Rural Development Centers which... of the Secretary of Agriculture STATE AND REGIONAL ANNUAL PLANS OF WORK Regional Program § 23.13 Plan of Work. (a) A Regional Plan of Work for carrying out the programs authorized to be funded under...

  14. 77 FR 47373 - Fiscal Year 2012 Draft Work Plan; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-08

    ... DENALI COMMISSION Fiscal Year 2012 Draft Work Plan; Correction AGENCY: Denali Commission. ACTION... Federal Register of May 23, 2012, concerning request for comments on the Draft Work Plan for Federal Fiscal Year 2012. This revision to Fiscal Year 2012 Work Plan is to provide clarifying edits. In...

  15. 7 CFR 1710.209 - Approval requirements for load forecast work plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... cooperate in the preparation of and submittal of the load forecast work plan of their power supply borrower. (b) An approved load forecast work plan establishes the process for the preparation and maintenance... approved load forecast work plan must outline the coordination and preparation requirements for both the...

  16. Some guidance on preparing validation plans for the DART Full System Models.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gray, Genetha Anne; Hough, Patricia Diane; Hills, Richard Guy

    2009-03-01

    Planning is an important part of computational model verification and validation (V&V) and the requisite planning document is vital for effectively executing the plan. The document provides a means of communicating intent to the typically large group of people, from program management to analysts to test engineers, who must work together to complete the validation activities. This report provides guidelines for writing a validation plan. It describes the components of such a plan and includes important references and resources. While the initial target audience is the DART Full System Model teams in the nuclear weapons program, the guidelines are generallymore » applicable to other modeling efforts. Our goal in writing this document is to provide a framework for consistency in validation plans across weapon systems, different types of models, and different scenarios. Specific details contained in any given validation plan will vary according to application requirements and available resources.« less

  17. OAST Space Theme Workshop. Volume 1: Summary report. 1: Introduction. 2: General observations and some key findings. 3: Follow-on activity. Quick-look comments and working papers

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The Outlook for Space Study, consideration of National needs and OAST technology goals were factors in the selection of the following themes for candidate technical initiative and supporting program plans: space power station; search for extraterrestrial life; industrialization of space; global service station; exploration of the solar system; and advanced space transportation system. An overview is presented of the Space Theme Workshop activities in developing technology needs, program requirements, and proposed plans in support of each theme. The unedited working papers used by team members are included.

  18. Concurrent Path Planning with One or More Humanoid Robots

    NASA Technical Reports Server (NTRS)

    Reiland, Matthew J. (Inventor); Sanders, Adam M. (Inventor)

    2014-01-01

    A robotic system includes a controller and one or more robots each having a plurality of robotic joints. Each of the robotic joints is independently controllable to thereby execute a cooperative work task having at least one task execution fork, leading to multiple independent subtasks. The controller coordinates motion of the robot(s) during execution of the cooperative work task. The controller groups the robotic joints into task-specific robotic subsystems, and synchronizes motion of different subsystems during execution of the various subtasks of the cooperative work task. A method for executing the cooperative work task using the robotic system includes automatically grouping the robotic joints into task-specific subsystems, and assigning subtasks of the cooperative work task to the subsystems upon reaching a task execution fork. The method further includes coordinating execution of the subtasks after reaching the task execution fork.

  19. The Changing Motivations of Students' Use of Lecture Podcasts across a Semester: An Extended Theory of Planned Behaviour Approach

    ERIC Educational Resources Information Center

    Moss, Nathan D.; Hamilton, Kyra; White, Katherine M.; Hansen, Julie

    2015-01-01

    We extended the previous work of Moss, O'Connor and White, to include a measure of group norms within the theory of planned behaviour (TPB), to examine the influences on students' decisions to use lecture podcasts as part of their learning. Participants (N?=?90) completed the extended TPB predictors before semester began (Time 1) and mid-semester…

  20. Career Planning and Placement in the Small College. Proceedings of the Annual Conference (3rd, Alma College, Michigan, May 9-11, 1979).

    ERIC Educational Resources Information Center

    Riser-Schock, Ginny, Ed.

    Seventeen presentations made at the third annual conference on career planning and placement in the small college are presented. The thrust of the conference was aimed at cooperation and sharing of ideas of professionals working in one- or two-person offices within the constraints of a limited budget. Among the presentations included are (1)…

  1. Step 1: Human System Integration Simulation and Flight Test Progress Report

    NASA Technical Reports Server (NTRS)

    2005-01-01

    The Access 5 Human Systems Integration Work Package produced simulation and flight demonstration planning products for use throughout the program. These included: Test Objectives for Command, Control, Communications; Pilot Questionnaire for Command, Control, Communications; Air Traffic Controller Questionnaire for Command, Control, Communications; Test Objectives for Collision Avoidance; Pilot Questionnaire for Collision Avoidance; Plans for Unmanned Aircraft Systems Control Station Simulations Flight Requirements for the Airspace Operations Demonstration

  2. The CHPRC Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fix, N. J.

    The scope of the CH2M Hill Plateau Remediation Company, LLC (CHPRC) Groundwater and Technical Integration Support (Master Project) is for Pacific Northwest National Laboratory staff to provide technical and integration support to CHPRC. This work includes conducting investigations at the 300-FF-5 Operable Unit and other groundwater operable units, and providing strategic integration, technical integration and assessments, remediation decision support, and science and technology. The projects under this Master Project will be defined and included within the Master Project throughout the fiscal year, and will be incorporated into the Master Project Plan. This Quality Assurance Management Plan provides the quality assurancemore » requirements and processes that will be followed by the CHPRC Groundwater and Technical Integration Support (Master Project) and all releases associated with the CHPRC Soil and Groundwater Remediation Project. The plan is designed to be used exclusively by project staff.« less

  3. Support to LANL: Cost estimation. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This report summarizes the activities and progress by ICF Kaiser Engineers conducted on behalf of Los Alamos National Laboratories (LANL) for the US Department of Energy, Office of Waste Management (EM-33) in the area of improving methods for Cost Estimation. This work was conducted between October 1, 1992 and September 30, 1993. ICF Kaiser Engineers supported LANL in providing the Office of Waste Management with planning and document preparation services for a Cost and Schedule Estimating Guide (Guide). The intent of the Guide was to use Activity-Based Cost (ABC) estimation as a basic method in preparing cost estimates for DOEmore » planning and budgeting documents, including Activity Data Sheets (ADSs), which form the basis for the Five Year Plan document. Prior to the initiation of the present contract with LANL, ICF Kaiser Engineers was tasked to initiate planning efforts directed toward a Guide. This work, accomplished from June to September, 1992, included visits to eight DOE field offices and consultation with DOE Headquarters staff to determine the need for a Guide, the desired contents of a Guide, and the types of ABC estimation methods and documentation requirements that would be compatible with current or potential practices and expertise in existence at DOE field offices and their contractors.« less

  4. Knowledge co-production and boundary work to promote implementation of conservation plans.

    PubMed

    Nel, Jeanne L; Roux, Dirk J; Driver, Amanda; Hill, Liesl; Maherry, Ashton C; Snaddon, Kate; Petersen, Chantel R; Smith-Adao, Lindie B; Van Deventer, Heidi; Reyers, Belinda

    2016-02-01

    Knowledge co-production and boundary work offer planners a new frame for critically designing a social process that fosters collaborative implementation of resulting plans. Knowledge co-production involves stakeholders from diverse knowledge systems working iteratively toward common vision and action. Boundary work is a means of creating permeable knowledge boundaries that satisfy the needs of multiple social groups while guarding the functional integrity of contributing knowledge systems. Resulting products are boundary objects of mutual interest that maintain coherence across all knowledge boundaries. We examined how knowledge co-production and boundary work can bridge the gap between planning and implementation and promote cross-sectoral cooperation. We applied these concepts to well-established stages in regional conservation planning within a national scale conservation planning project aimed at identifying areas for conserving rivers and wetlands of South Africa and developing an institutional environment for promoting their conservation. Knowledge co-production occurred iteratively over 4 years in interactive stake-holder workshops that included co-development of national freshwater conservation goals and spatial data on freshwater biodiversity and local conservation feasibility; translation of goals into quantitative inputs that were used in Marxan to select draft priority conservation areas; review of draft priority areas; and packaging of resulting map products into an atlas and implementation manual to promote application of the priority area maps in 37 different decision-making contexts. Knowledge co-production stimulated dialogue and negotiation and built capacity for multi-scale implementation beyond the project. The resulting maps and information integrated diverse knowledge types of over 450 stakeholders and represented >1000 years of collective experience. The maps provided a consistent national source of information on priority conservation areas for rivers and wetlands and have been applied in 25 of the 37 use contexts since their launch just over 3 years ago. When framed as a knowledge co-production process supported by boundary work, regional conservation plans can be developed into valuable boundary objects that offer a tangible tool for multi-agency cooperation around conservation. Our work provides practical guidance for promoting uptake of conservation science and contributes to an evidence base on how conservation efforts can be improved. © 2015 Society for Conservation Biology.

  5. Shifting Resources and Focus to Meet the Goals of the National HIV/AIDS Strategy: The Enhanced Comprehensive HIV Prevention Planning Project, 2010–2013

    PubMed Central

    Purcell, David W.; Fisher, Holly H.; Belcher, Lisa; Carey, James W.; Courtenay-Quirk, Cari; Dunbar, Erica; Eke, Agatha N.; Galindo, Carla A.; Glassman, Marlene; Margolis, Andrew D.; Neumann, Mary Spink; Prather, Cynthia; Stratford, Dale; Taylor, Raekiela D.; Mermin, Jonathan

    2016-01-01

    In September 2010, CDC launched the Enhanced Comprehensive HIV Prevention Planning (ECHPP) project to shift HIV-related activities to meet goals of the 2010 National HIV/AIDS Strategy (NHAS). Twelve health departments in cities with high AIDS burden participated. These 12 grantees submitted plans detailing jurisdiction-level goals, strategies, and objectives for HIV prevention and care activities. We reviewed plans to identify themes in the planning process and initial implementation. Planning themes included data integration, broad engagement of partners, and resource allocation modeling. Implementation themes included organizational change, building partnerships, enhancing data use, developing protocols and policies, and providing training and technical assistance for new and expanded activities. Pilot programs also allowed grantees to assess the feasibility of large-scale implementation. These findings indicate that health departments in areas hardest hit by HIV are shifting their HIV prevention and care programs to increase local impact. Examples from ECHPP will be of interest to other health departments as they work toward meeting the NHAS goals. PMID:26843670

  6. The U.S. National Action Plan to Improve Health Literacy: A Model for Positive Organizational Change.

    PubMed

    Baur, Cynthia; Harris, Linda; Squire, Elizabeth

    2017-01-01

    This chapter presents the U.S. National Action Plan to Improve Health Literacy and its unique contribution to public health and health care in the U.S. The chapter details what the National Action Plan is, how it evolved, and how it has influenced priorities for health literacy improvement work. Examples of how the National Action Plan fills policy and research gaps in health care and public health are included. The first part of the chapter lays the foundation for the development of the National Action Plan, and the second part discusses how it can stimulate positive organizational change to help create health literate organizations and move the nation towards a health literate society.

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan formore » the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.« less

  8. 7 CFR 1717.154 - Transitional assistance in connection with new loans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... to finance equipment and facilities included in a RUS approved construction work plan or amendment if... requests for this longer reimbursement period, RUS will consider the stresses that the transaction and...

  9. 7 CFR 1717.154 - Transitional assistance in connection with new loans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... to finance equipment and facilities included in a RUS approved construction work plan or amendment if... requests for this longer reimbursement period, RUS will consider the stresses that the transaction and...

  10. Advanced transportation management technologies : participant reference guide : Demonstration Project No. 105

    DOT National Transportation Integrated Search

    1997-04-01

    This demonstration project will provide an opportunity for policy and decision makers from transportation agencies including State and local Departments of Transportation (DOTs), Departments of Public Works (DPWs), and Metropolitan Planning Organizat...

  11. 33 CFR 236.6 - Other agencies EQ measures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ENVIRONMENTAL QUALITY § 236.6 Other agencies EQ measures. The selected plan may include EQ measures not proposed..., implementation of such measures will not be required as local cooperation for the works proposed for Corps...

  12. Advanced Simulation and Computing Fiscal Year 2016 Implementation Plan, Version 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCoy, M.; Archer, B.; Hendrickson, B.

    2015-08-27

    The Stockpile Stewardship Program (SSP) is an integrated technical program for maintaining the safety, surety, and reliability of the U.S. nuclear stockpile. The SSP uses nuclear test data, computational modeling and simulation, and experimental facilities to advance understanding of nuclear weapons. It includes stockpile surveillance, experimental research, development and engineering programs, and an appropriately scaled production capability to support stockpile requirements. This integrated national program requires the continued use of experimental facilities and programs, and the computational capabilities to support these programs. The purpose of this IP is to outline key work requirements to be performed and to control individualmore » work activities within the scope of work. Contractors may not deviate from this plan without a revised WA or subsequent IP.« less

  13. Ecology of Greater Sage-Grouse in the Bi-State Planning Area Final Report, September 2007

    USGS Publications Warehouse

    Casazza, Michael L.; Overton, Cory T.; Farinha, Melissa A.; Torregrosa, Alicia; Fleskes, Joseph P.; Miller, Michael R.; Sedinger, James S.; Kolada, Eric J.

    2009-01-01

    Conservation efforts for greater sage-grouse (Centrocercus urophasianus), hereafter sage-grouse, are underway across the range of this species. Over 70 local working groups have been established and are implementing on-the-ground sage-grouse oriented conservation projects. Early on in this process, the California Department of Fish and Game (CDFG) recognized the need to join in these efforts and received funding from the U.S. Fish and Wildlife Service (USFWS) under the Candidate Species Conservation Program to help develop a species conservation plan for sage-grouse in the Mono County area. This conservation plan covers portions of Alpine, Mono, and Inyo counties in California and Douglas, Esmeralda, Lyon, and Mineral counties in Nevada. A concurrent effort underway through the Nevada Governor's Sage-grouse Conservation Team established Local Area Working Groups across Nevada and eastern California. The Mono County populations of sage-grouse were encompassed by the Bi-State Local Planning Area, which was comprised of six population management units (PMUs). The state agencies from California (CDFG) and Nevada (Nevada Department of Wildlife; NDOW) responsible for the management of sage-grouse agreed to utilize the process that had begun with the Nevada Governor's Team in order to develop local plans for conservation planning and implementation. Resources from the USFWS were applied to several objectives in support of the development of the Bi-State Local Area Sage-grouse Conservation Plan through a grant to the U.S. Geological Survey (USGS). Objectives included: (1) participate in the development of the Bi-State Conservation Plan, (2) compile and synthesize existing sage-grouse data, (3) document seasonal movements of sage-grouse, (4) identify habitats critical to sage-grouse, (5) determine survival rates and identify causal factors of mortality, (6) determine nest success and brood success of sage-grouse, and (7) identify sage-grouse lek sites. Progress reports completed in 2004 and 2005 addressed each of the specific objectives and this final report focuses on the biological information gathered in support of local conservation efforts. Participation in the development of the Bi-State Local Area Conservation Plan was accomplished on multiple scales. Beginning in the fall of 2002, USGS personnel began participating in meetings of local stakeholders involved in the development of a sage-grouse conservation plan for the Bi-State planning area. This included attendance at numerous local PMU group meetings and field trips as well as participating on the technical advisory committee (TAC) for the Bi-State group. Whenever appropriate, ongoing results and findings regarding sage-grouse ecology in the local area were incorporated into these working group meetings. In addition, the USGS partnered with CDFG to help reorganize one of the local PMU groups (South Mono) and edited that portion of the Bi-State plan. The USGS also worked closely with CDFG to draft a description of the state of knowledge for sage-grouse genetic information for inclusion in the Bi-State Conservation Plan. The first edition of the Bi-State Conservation Plan for Greater Sage-Grouse was completed in June 2004 (Bi-State Sage-grouse Conservation Team 2004). This report is organized primarily by PMU to facilitate the incorporation of these research findings into the individual PMU plans that compose the Bi-State plan. Information presented in this report was derived from over 7,000 radio-telemetry locations obtained on 145 individual sage-grouse during a three year period (2003-2005). In addition, we collected detailed vegetation measurements at over 590 habitat sampling plots within the study area including canopy cover, shrubs, forbs, and grasses diversity. Vegetation data collection focused on sage-grouse nests, and brood-use areas. Additionally we collected data at random sites to examine sage-grouse habitat relationships within the study area. The majori

  14. Galileo mission planning for Low Gain Antenna based operations

    NASA Technical Reports Server (NTRS)

    Gershman, R.; Buxbaum, K. L.; Ludwinski, J. M.; Paczkowski, B. G.

    1994-01-01

    The Galileo mission operations concept is undergoing substantial redesign, necessitated by the deployment failure of the High Gain Antenna, while the spacecraft is on its way to Jupiter. The new design applies state-of-the-art technology and processes to increase the telemetry rate available through the Low Gain Antenna and to increase the information density of the telemetry. This paper describes the mission planning process being developed as part of this redesign. Principal topics include a brief description of the new mission concept and anticipated science return (these have been covered more extensively in earlier papers), identification of key drivers on the mission planning process, a description of the process and its implementation schedule, a discussion of the application of automated mission planning tool to the process, and a status report on mission planning work to date. Galileo enhancements include extensive reprogramming of on-board computers and substantial hard ware and software upgrades for the Deep Space Network (DSN). The principal mode of operation will be onboard recording of science data followed by extended playback periods. A variety of techniques will be used to compress and edit the data both before recording and during playback. A highly-compressed real-time science data stream will also be important. The telemetry rate will be increased using advanced coding techniques and advanced receivers. Galileo mission planning for orbital operations now involves partitioning of several scarce resources. Particularly difficult are division of the telemetry among the many users (eleven instruments, radio science, engineering monitoring, and navigation) and allocation of space on the tape recorder at each of the ten satellite encounters. The planning process is complicated by uncertainty in forecast performance of the DSN modifications and the non-deterministic nature of the new data compression schemes. Key mission planning steps include quantifying resource or capabilities to be allocated, prioritizing science observations and estimating resource needs for each, working inter-and intra-orbit trades of these resources among the Project elements, and planning real-time science activity. The first major mission planning activity, a high level, orbit-by-orbit allocation of resources among science objectives, has already been completed; and results are illustrated in the paper. To make efficient use of limited resources, Galileo mission planning will rely on automated mission planning tools capable of dealing with interactions among time-varying downlink capability, real-time science and engineering data transmission, and playback of recorded data. A new generic mission planning tool is being adapted for this purpose.

  15. Galileo mission planning for Low Gain Antenna based operations

    NASA Astrophysics Data System (ADS)

    Gershman, R.; Buxbaum, K. L.; Ludwinski, J. M.; Paczkowski, B. G.

    1994-11-01

    The Galileo mission operations concept is undergoing substantial redesign, necessitated by the deployment failure of the High Gain Antenna, while the spacecraft is on its way to Jupiter. The new design applies state-of-the-art technology and processes to increase the telemetry rate available through the Low Gain Antenna and to increase the information density of the telemetry. This paper describes the mission planning process being developed as part of this redesign. Principal topics include a brief description of the new mission concept and anticipated science return (these have been covered more extensively in earlier papers), identification of key drivers on the mission planning process, a description of the process and its implementation schedule, a discussion of the application of automated mission planning tool to the process, and a status report on mission planning work to date. Galileo enhancements include extensive reprogramming of on-board computers and substantial hard ware and software upgrades for the Deep Space Network (DSN). The principal mode of operation will be onboard recording of science data followed by extended playback periods. A variety of techniques will be used to compress and edit the data both before recording and during playback. A highly-compressed real-time science data stream will also be important. The telemetry rate will be increased using advanced coding techniques and advanced receivers. Galileo mission planning for orbital operations now involves partitioning of several scarce resources. Particularly difficult are division of the telemetry among the many users (eleven instruments, radio science, engineering monitoring, and navigation) and allocation of space on the tape recorder at each of the ten satellite encounters. The planning process is complicated by uncertainty in forecast performance of the DSN modifications and the non-deterministic nature of the new data compression schemes. Key mission planning steps include quantifying resource or capabilities to be allocated, prioritizing science observations and estimating resource needs for each, working inter-and intra-orbit trades of these resources among the Project elements, and planning real-time science activity. The first major mission planning activity, a high level, orbit-by-orbit allocation of resources among science objectives, has already been completed; and results are illustrated in the paper. To make efficient use of limited resources, Galileo mission planning will rely on automated mission planning tools capable of dealing with interactions among time-varying downlink capability, real-time science and engineering data transmission, and playback of recorded data. A new generic mission planning tool is being adapted for this purpose.

  16. Psychosocial service needs of pediatric transport accident survivors: Using clinical data-mining to establish demographic and service usage characteristics.

    PubMed

    Manguy, Alys-Marie; Joubert, Lynette; Bansemer, Leah

    2016-09-01

    The objectives in this article are the exploration of demographic and service usage data gained through clinical data mining audit and suggesting recommendations for social work service delivery model and future research. The method is clinical data-mining audit of 100 sequentially sampled cases gathering quantitative demographic and service usage data. Descriptive analysis of file audit data raised interesting trends with potential to inform service delivery and usage; the key areas of the results included patient demographics, family involvement and impact, and child safety and risk issues. Transport accidents involving children often include other family members. Care planning must take into account psychosocial issues including patient and family emotional responses, availability of primary carers, and other practical needs that may impact on recovery and discharge planning. This study provides evidence to plan for further research and development of more integrated models of care.

  17. The special programme of research in human reproduction: forty years of activities to achieve reproductive health for all.

    PubMed

    Benagiano, Giuseppe; d'Arcangues, Catherine; Harris Requejo, Jennifer; Schafer, Alessandra; Say, Lale; Merialdi, Mario

    2012-01-01

    The Special Programme of Research in Human Reproduction (HRP), co-sponsored by the UNDP, UNFPA, WHO, and the World Bank, is celebrating 40 years of activities with an expansion of its mandate and new co-sponsors. When it began, in 1972, the main focus was on evaluating the acceptability, effectiveness, and safety of existing fertility-regulating methods, as well as developing new, improved modalities for family planning. In 1994, HRP not only made major contributions to the Plan of Action of the International Conference on Population and Development (ICPD); it also broadened its scope of work to include other aspects of health dealing with sexuality and reproduction, adding a specific perspective on gender issues and human rights. In 2002, HRP's mandate was once again broadened to include sexually transmitted infections and HIV/AIDS and in 2003 it was further expanded to research activities on preventing violence against women and its many dire health consequences. Today, the work of the Programme includes research on: the sexual and reproductive health of adolescents, women, and men; maternal and perinatal health; reproductive tract and sexually transmitted infections (including HIV/AIDS); family planning; infertility; unsafe abortion; sexual health; screening for cancer of the cervix in developing countries, and gender and reproductive rights. Additional activities by the Programme have included: fostering international cooperation in the field of human reproduction; the elaboration of WHO's first Global Reproductive Health Strategy; work leading to the inclusion of ICPD's goal 'reproductive health for all by 2015' into the Millennium Development Goal framework; the promotion of critical interagency statements on the public health, legal, and human rights implications of female genital mutilation and gender-biased sex selection. Finally, HRP has been involved in the creation of guidelines and tools, such as the 'Medical eligibility criteria for contraceptive use', the 'Global handbook for family planning providers', the 'Definition of core competencies in primary health care', and designing tools for operationalizing a human rights approach to sexual and reproductive health programmes. Copyright © 2012 S. Karger AG, Basel.

  18. GGOS working group on ground networks and communications

    NASA Technical Reports Server (NTRS)

    Pearlman, M.; Altamimi, Z.; Beck, N.; Forsberg, R.; Gurtner, W.; Kenyon, S.; Behrend, D.; Lemoine, F. G.; Ma, C.; Noll, C. E.; hide

    2005-01-01

    Activities of this Working Group include the investigation of the status quo and the development of a plan for full network integration to support improvements in terrestrial reference frame establishment and maintenance, Earth orientation and gravity field monitoring, precision orbit determination, and other geodetic and gravimetric applications required for the long-term observation of global change. This integration process includes the development of a network of fundamental stations with as many co-located techniques as possible, with precisely determined intersystem vectors. This network would exploit the strengths of each technique and minimize the weaknesses where possible. This paper discusses the organization of the working group, the work done to date, and future tasks.

  19. 7 CFR 1710.206 - Approval requirements for load forecasts prepared pursuant to approved load forecast work plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... narrative shall address the overall approach, time periods, and expected internal and external uses of the forecast. Examples of internal uses include providing information for developing or monitoring demand side... suppliers. Examples of external uses include meeting state and Federal regulatory requirements, obtaining...

  20. Toward the Institutionalization of Change. Working Paper No. 11.

    ERIC Educational Resources Information Center

    Wilson, Albert; Wilson, Donna

    In connection with plans for the publication of an annual series of reports on the "Future State of the Union," conceptual problems of such an undertaking are explored and some of the features to be included are examined. Philosophical prerequisites discussed include a model of change; a cybernetic model; some social indicators for…

  1. Targeted Transition Assessment Leading to Job Placement for Young Adults with Disabilities in Rural Areas

    ERIC Educational Resources Information Center

    Morgan, Robert L.; Openshaw, Kristi P.

    2011-01-01

    In rural areas, transition planning for young adults with disabilities presents considerable challenges, including linkage to employment upon completion of special education services. Two assessment programs, described in this article, work in concert to assist transition teachers and youth with disabilities in rural areas and include: (a)…

  2. 75 FR 37790 - Lauryl Sulfate Salts; Antimicrobial Registration Review Final Work Plan and Proposed Registration...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-30

    ... function without unreasonable adverse effects on human health or the environment. Through this program, EPA..., including its effects on human health and the environment. DATES: Comments must be received on or before... interest to a wide range of stakeholders including environmental, human health, farm worker, and...

  3. Occupational Exploration at Ontario Junior High School: 9th Grade.

    ERIC Educational Resources Information Center

    Bates, Gene; And Others

    The document contains 56 activities for Grade 9. The contents include the following areas: questions about the future; job seeking activities and guidelines; career games; a personal interest check list; unit guides for courses in World of Work (55 pages), and Career Educational Planning (40 pages) which include objectives, activities, evaluation,…

  4. The path to active living: physical activity through community design in Somerville, Massachusetts.

    PubMed

    Burke, Noreen M; Chomitz, Virginia R; Rioles, Nicole A; Winslow, Stephen P; Brukilacchio, Lisa B; Baker, Jessie C

    2009-12-01

    Somerville, Massachusetts, an ethnically diverse, urban community northwest of Boston, presents opportunities and challenges for active living. With a dense street grid, well-maintained sidewalks, neighborhood parks, and existing Community Path, Somerville is very walkable. However, two major surface arteries traverse and bisect neighborhoods, creating pedestrian safety and environmental justice issues. Major goals included promoting increased collaboration and communication among existing active-living efforts; managing the Community Path extension project; encouraging Portuguese-speaking adults to incorporate daily physical activity; leveraging existing urban planning work to establish secure, attractive walking/biking corridors; and embedding active-living messages in everyday life. The Somerville Active Living by Design Partnership (ALbD) successfully created a robust task force that was integrated with citywide active-living efforts, secured resources to increase infrastructure and support for active living, including city-level coordinator positions, and changed decision-making practices that led to incorporation of pedestrian and bicycle transportation priorities into city planning and that influenced the extension of the Community Path. Partnerships must employ sustainability planning early on, utilize skilled facilitative leaders to manage leadership transitions, and engage new partners. Identifying, cultivating, and celebrating champions, especially those with political power, are critical. Working closely with research partners leads to rich data sources for planning and evaluation. Changing the built environment is difficult; working toward smaller wins is realistic and achievable. The synergy of ALbD and other community interventions created a foundation for short-term successes and accelerated political-cultural changes already underway with respect to active living.

  5. Center Planning and Development Student Engineer

    NASA Technical Reports Server (NTRS)

    Jenkins, Kenneth T.

    2013-01-01

    This fall I was the Student Trainee (Engineering) Pathways Intern (co-op) at the Kennedy Space Center (KSC) in the Center Planning Development (CPD) Directorate. CPD works with commercial companies who are interested using KSCs unique capabilities in spaceflight, spacecraft processing, ground systems and Research Development (RD) projects that fall in line with NASAs mission and goals. CPD is divided into four (4) groups: (1) AD-A, which works on the Master Planning for center, (2) AD-B (where I am), which works on project management and integration, (3) AD-C, which works on partnership development, and (4) AD-T, which works on the RD aspects of partnerships. CPDs main goal is to one day make KSC the worlds largest spaceport and maintain the center as a leader in space exploration. CPD is a very diverse group with employees having a wide knowledge of not only the Space Shuttle, but also that of the Apollo era. Our director of CPD, Scott Colloredo, is on the advisory board for Commercial Space Operations (CSO) and has a degree at ERAU. I worked on a number of different tasks for AD-B, as well as CPD, that includes, but not limited to: reviewing and reissuing engineering drawings from the Apollo and Shuttle eras, to supporting NASA rocket launches (MAVEN), and working on actual agreementsproposals that will be used in the partnership process with multiple partners. Most of the work I have done is sensitive information and cannot be disclosed.

  6. Leveraging standards to support patient-centric interdisciplinary plans of care.

    PubMed

    Dykes, Patricia C; DaDamio, Rebecca R; Goldsmith, Denise; Kim, Hyeon-eui; Ohashi, Kumiko; Saba, Virginia K

    2011-01-01

    As health care systems and providers move towards meaningful use of electronic health records, the once distant vision of collaborative patient-centric, interdisciplinary plans of care, generated and updated across organizations and levels of care, may soon become a reality. Effective care planning is included in the proposed Stages 2-3 Meaningful Use quality measures. To facilitate interoperability, standardization of plan of care messaging, content, information and terminology models are needed. This degree of standardization requires local and national coordination. The purpose of this paper is to review some existing standards that may be leveraged to support development of interdisciplinary patient-centric plans of care. Standards are then applied to a use case to demonstrate one method for achieving patient-centric and interoperable interdisciplinary plan of care documentation. Our pilot work suggests that existing standards provide a foundation for adoption and implementation of patient-centric plans of care that are consistent with federal requirements.

  7. Space Transportation Propulsion Systems

    NASA Technical Reports Server (NTRS)

    Liou, Meng-Sing; Stewart, Mark E.; Suresh, Ambady; Owen, A. Karl

    2001-01-01

    This report outlines the Space Transportation Propulsion Systems for the NPSS (Numerical Propulsion System Simulation) program. Topics include: 1) a review of Engine/Inlet Coupling Work; 2) Background/Organization of Space Transportation Initiative; 3) Synergy between High Performance Computing and Communications Program (HPCCP) and Advanced Space Transportation Program (ASTP); 4) Status of Space Transportation Effort, including planned deliverables for FY01-FY06, FY00 accomplishments (HPCCP Funded) and FY01 Major Milestones (HPCCP and ASTP); and 5) a review current technical efforts, including a review of the Rocket-Based Combined-Cycle (RBCC), Scope of Work, RBCC Concept Aerodynamic Analysis and RBCC Concept Multidisciplinary Analysis.

  8. Key Transition Issues for Youth with Disabilities and Chronic Health Conditions. Healthy & Ready To Work (HRTW) Policy Brief.

    ERIC Educational Resources Information Center

    Schulzinger, Rhoda

    This paper explains recent changes in the Supplemental Security Income (SSI) program that affect adolescents with disabilities or chronic health problems. Changes include the SSI work incentives available to them, how they can maintain access to quality health care and benefits during their transition years, and key issues in transition planning.…

  9. Support and Dissemination of Teacher-Authored Lesson Plans: a Digital Library for Earth System Education (DLESE) and Geological Society of America (GSA) Collaboration

    NASA Astrophysics Data System (ADS)

    Devaul, H.; Pandya, R. E.; McLelland, C. V.

    2003-12-01

    The Digital Library for Earth System Education (www.dlese.org) and the Geological Society of America (www.geosociety.org) are working together to publish and disseminate teacher-authored Earth science lesson plans. DLESE is a community-based effort involving teachers, students, and scientists working together to create a library of educational resources and services to support Earth system science education. DLESE offers free access to electronic resources including lesson plans, maps, images, data sets, visualizations, and assessment activities. A number of thematic collections have recently been accessioned, which has substantially increased library holdings. Working in concert with GSA, a non-profit organization dedicated to the advancement of the geosciences, small-scale resource creators such as classroom teachers without access to a web server can also share educational resources of their own design. Following a two-step process, lesson plans are submitted to the GSA website, reviewed and posted to the K-12 resource area: http://www.geosociety.org/educate/resources.htm. These resources are also submitted to the DLESE Community Collection using a simple cataloging tool. In this way resources are available to other teachers via the GSA website as well as via the DLESE collection. GSA provides a template for lesson plan developers which assists in providing the necessary information to help users find and understand the intent of the activity when searching in DLESE. This initial effort can serve as a prototype for important services allowing individual community members to contribute their work to DLESE with little technical overhead.

  10. Factors affecting public dissatisfaction with urban family physician plan: A general population based study in Fars Province.

    PubMed

    Imanieh, Mohammad Hadi; Mirahmadizadeh, Alireza; Imani, Bahareh

    2017-11-01

    Understanding the level of public satisfaction with a family physician plan as well as the relevant factors in this respect, can be employed as valuable tools in identifying quality of services. To determine the factors affecting public dissatisfaction with an urban family physician plan in Iran. This cross-sectional study was conducted from January 2014 through June 2015 on Fars Province residents in Iran, selected based on cluster sampling method. The data collection instrument was comprised of a two-part checklist including demographic information and items related to dissatisfaction with the family physician plan, specialists, para-clinic services, pharmacy, physicians on shift work, emergency services, and family physician assistants. Data were described by SPSS 20. In this study, 1,020 individuals (524 males, 496 females) were investigated. Based on the results, the most frequent factor affecting dissatisfaction with physicians was their single work shifts and unavailability (53%). In terms of dissatisfaction with family physicians' specialist colleagues and para-clinic services, the most common factors were related to difficulty in obtaining a referral form (41.5%) and making appointments (21.6%), respectively. Given the level of dissatisfaction with pharmacies, the significant factor was reported to be excessive delay in medication delivery (31.6%); and in terms of physicians on shift work and emergency services, the most important factor was lower work hours for family physicians (9.2%). It seems that, the most common causes of dissatisfaction with the urban family physician plan are due to the short duration of services, obtaining a referral form and making appointments, and providing prescribed medications.

  11. Future Career Plans and Practice Patterns of Canadian Obstetrics and Gynaecology Residents in 2011.

    PubMed

    Burrows, Jason; Coolen, Jillian

    2016-01-01

    The practice patterns of Obstetricians and Gynaecologists continue to evolve with each new generation of physicians. Diversifying subspecialties, changes in resident duty hours, job market saturation, and desire for work-life balance are playing stronger roles. Professional practice direction and needs assessment may be aided by awareness of future Obstetrics and Gynaecology physician career plans and expectations. The objective of this study was to determine the expected career plans and practice patterns of Canadian Obstetrics and Gynaecology residents following residency. The SOGC Junior Member Committee administered its third career planning survey to Canadian Obstetrics and Gynaecology residents electronically in December 2011. The data collected was statistically analyzed and compared to previous surveys. There were 183 responses giving a response rate of 43%. More than one half of all residents were considering postgraduate training (58%). Projected practice patterns included: 84% maintaining obstetrical practice, 60% locuming, and 50% job-sharing. The majority of residents expected to work in a 6 to 10 person call group (48%), work 3 to 5 call shifts per month (72%), work 41 to 60 hours weekly (69%), and practise in a city with a population greater than 500 000 (45%). Only 18% of residents surveyed were in favour of streaming residency programs in Obstetrics and Gynaecology. Canadian resident career plan and expected practice pattern assessment remains an important tool for aiding in resource allocation and strategic development of care and training in Obstetrics and Gynaecology in Canada. Copyright © 2016 Society of Obstetricians and Gynaecologists of Canada. Published by Elsevier Inc. All rights reserved.

  12. Spaceport Florida Authority: Business Plan

    NASA Technical Reports Server (NTRS)

    1996-01-01

    The Spaceport Florida Authority (SFA) was established under Florida Statute by the Governor and Legislature to assist the development of our nation's space transportation industry and to generate new space-related jobs, investment and opportunities statewide. Included in the Authorities' business plan is the statement of work and list of team members involved in creating the report, SFA's current operating concept, market analysis, assessment of accomplishments, a sample operating concept and a "roadmap to success".

  13. Transition Workbook for Combat Veterans. Postdeployment User Guide

    DTIC Science & Technology

    2009-01-01

    red meats, including pork, and especially fatty cuts (eg, prime, chuck). 4. CARBOHYDRATES • Eat whole grains , fresh fruits , and vegetables that are high... add some more challenges and solutions to your troubleshooting plan and then keep going. 3. Plan some celebrations along the way. What benchmarks...Bring my pictures in and ask some other work colleagues who knew him/her if they have any pictures of the Marine that they could add . Collect any

  14. Space Station Freedom Utilization Conference. Executive summary

    NASA Technical Reports Server (NTRS)

    1993-01-01

    The Space Station Freedom Utilization Conference was held on 3-6 Aug. 1992 in Huntsville, Alabama. The purpose of the conference was to bring together prospective space station researchers and the people in NASA and industry with whom they would be working to exchange information and discuss plans and opportunities for space station research. Topics covered include: research capabilities; research plans and opportunities; life sciences research; technology research; and microgravity research and biotechnology.

  15. Focus on Customer Service. Service Management: How to Plan for it Rather Than Hope for It [and] Learning to Say "Yes": A Customer Service Program for Library Staff [and] Maintaining Momentum in a Quality Improvement Process.

    ERIC Educational Resources Information Center

    Brewer, Julie; And Others

    1995-01-01

    Presents three articles that discuss customer service in libraries, with a focus on planning for service management, a customer service program for library staff, and a quality improvement process. Highlights include developing and implementing service strategies, dealing with requests, redefining work relationships, coworkers as customers,…

  16. Meet EPA Biologist Laura Jackson, Ph.D.

    EPA Pesticide Factsheets

    Research Biologist Laura Jackson, Ph.D., has worked for the EPA for 22 years, leading research initiatives in a diversity of disciplines, including environmental monitoring, land use planning, and the impacts that urbanization has on an area's ecology

  17. Application of demographic analysis to pedestrian safety : [project summary].

    DOT National Transportation Integrated Search

    2017-05-01

    FDOT has been working diligently to improve its facilities for pedestrians and cyclists, including : initiatives like the Complete Streets Policy and Implementation Plan. However, one of the : challenges facing FDOT is targeting those areas of greate...

  18. Every Place Counts Leadership Academy : stories from community transportation leaders

    DOT National Transportation Integrated Search

    2017-01-01

    These stories highlight members of public and the impacts they had on transportation in their communities. Each storyteller describes how a transportation plan or project has increased the communitys access to opportunities including work, school,...

  19. Women in Academia: Work-Related Stresses.

    ERIC Educational Resources Information Center

    Keim, Jeanmarie; Erickson, Chris

    1998-01-01

    Highlights some of the more common stressors and difficulties faced by women in academia, particularly those of junior rank, in the areas of teaching, scholarship, and service, and outlines effective strategies, including plans for institutions, for overcoming barriers. (SLD)

  20. Oregon Department of Transportation research leader : fall 2008.

    DOT National Transportation Integrated Search

    2008-01-01

    The newsletter includes: : 1) To ensure safe travel through construction work zones, Traffic Control Plans (TCPs) are developed to communicate required traffic control measures to the construction team. The quality of the design and implementation of...

  1. 45 CFR 1160.4 - Eligibility for international exhibitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... have agreed to lend 125 works of art, covering every aspect of his career, many of which have not been seen together since the artist's death in 1919. The organizer is planning to include 25 masterpieces by...

  2. 45 CFR 1160.4 - Eligibility for international exhibitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... have agreed to lend 125 works of art, covering every aspect of his career, many of which have not been seen together since the artist's death in 1919. The organizer is planning to include 25 masterpieces by...

  3. 45 CFR 1160.4 - Eligibility for international exhibitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... have agreed to lend 125 works of art, covering every aspect of his career, many of which have not been seen together since the artist's death in 1919. The organizer is planning to include 25 masterpieces by...

  4. Cognitive profile in Duchenne muscular dystrophy boys without intellectual disability: The role of executive functions.

    PubMed

    Battini, R; Chieffo, D; Bulgheroni, S; Piccini, G; Pecini, C; Lucibello, S; Lenzi, S; Moriconi, F; Pane, M; Astrea, G; Baranello, G; Alfieri, P; Vicari, S; Riva, D; Cioni, G; Mercuri, E

    2018-02-01

    The aim of our prospective observational study was to assess profiles of cognitive function and a possible impairment of executive functions in a cohort of boys with Duchenne muscular dystrophy without intellectual and behavior disability. Forty Duchenne boys (range of age: 6 years to 11 years and 6 months) were assessed by Wechsler Intelligence scale and battery of tests including tasks assessing working memory and executive functions (inhibition and switching, problem solving and planning). In our cohort some aspects of cognitive function were often impaired. These included multitasking, problem solving, inhibition and working memory necessary to plan and direct goal oriented behavior. Our results support the suggestion that aspects of cognitive function could be impaired even in boys without intellectual disability and support the hypothesis that executive functions may play an important role in specific aspects of cognitive impairment in Duchenne muscular dystrophy. Copyright © 2017 Elsevier B.V. All rights reserved.

  5. Thirty years together: A chronology of U.S.-Soviet space cooperation

    NASA Technical Reports Server (NTRS)

    Portree, David S. F.

    1993-01-01

    The chronology covers 30 years of cooperation between the U.S. and the Soviet Union (and its successor, the Commonwealth of Independent States, of which the Russian Federation is the leading space power). It tracks successful cooperative projects and failed attempts at space cooperation. Included are the Dryden-Blagonravov talks; the UN Space Treaties; the Apollo Soyuz Test Project; COSPAS-SARSAT; the abortive Shuttle-Salyut discussions; widespread calls for joint manned and unmanned exploration of Mars; conjectural plans to use Energia and other Russian space hardware in ambitious future joint missions; and contemporary plans involving the U.S. Shuttle, Russian Mir, and Soyuz-TM. The chronology also includes events not directly related to space cooperation to provide context. A bibliography lists works and individuals consulted in compiling the chronology, plus works not used but relevant to the topic of space cooperation.

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, Geoffrey Wayne; Leonard, Philip; Hartline, Ernest Leon

    High Explosives and Technology (M-7) completed the second round of formulation and testing of Remediated Nitrate Salt (RNS) surrogates on March 17, 2016. This report summarizes the results of the work and also includes additional documentation required under test plan PLAN-TA9-2443 Rev B, "Remediated Nitrate Salt (RNS) Surrogate Formulation and Testing Standard Procedure", released February 16, 2016. All formulation and testing was carried out according to PLAN-TA9-2443 Rev B. Results from the first round of formulation and testing were documented in memorandum M7-16-6042, "Results from First Round of Remediated Nitrate Salt Surrogate Formulation and Testing."

  7. Autonomous Planning and Replanning for Mine-Sweeping Unmanned Underwater Vehicles

    NASA Technical Reports Server (NTRS)

    Gaines, Daniel M.

    2010-01-01

    This software generates high-quality plans for carrying out mine-sweeping activities under resource constraints. The autonomous planning and replanning system for unmanned underwater vehicles (UUVs) takes as input a set of prioritized mine-sweep regions, and a specification of available UUV resources including available battery energy, data storage, and time available for accomplishing the mission. Mine-sweep areas vary in location, size of area to be swept, and importance of the region. The planner also works with a model of the UUV, as well as a model of the power consumption of the vehicle when idle and when moving.

  8. AI-MSG modification work plan. [LMFBR

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Page, J.P.

    1973-08-20

    This document contains the Work Plan for the modification of the AI Steam Generator for tests in Large Leak Test Rig. This Work Plan describes the objectives, scope of work, schedule and manpower, end items, and meetings and reports required for the modification.

  9. Building successful coalitions for promoting advance care planning.

    PubMed

    Marchand, Lucille; Fowler, Kathryn J; Kokanovic, Obrad

    2006-01-01

    Advance care planning (ACP) has had few successful initiatives. This qualitative study explores the challenges and successes of an advance care planning coalition in Wisconsin called Life Planning 2000 using key informant interviews (n = 24) and grounded theory. Major themes included: commitment (the need for leadership, recruitment of key members, and funding); cohesiveness (disparate groups collaborating toward a common purpose), and outcomes (shift in paradigm from signing documents to process of advanced care planning, new-found collaborative relationships, and educational tool development). Coalitions need to define short-, intermediate-, and long-term goals that result in measurable outcomes and an evaluation process. Resources must be commensurate with goals. Strong leadership, paid staff adequate funding, and the collaboration of diverse groups working toward common goals are the basic requirements of a successful coalition.

  10. Migration plans and hours of work in Malaysia.

    PubMed

    Gillin, E D; Sumner, D A

    1985-01-01

    "This article describes characteristics of prospective migrants in the Malaysian Family Life Survey and investigates how planning to move affects hours of work. [The authors] use ideas about intertemporal substitution...to discuss the response to temporary and permanent wage expectations on the part of potential migrants. [An] econometric section presents reduced-form estimates for wage rates and planned migration equations and two-stage least squares estimates for hours of work. Men currently planning a move were found to work fewer hours. Those originally planning only a temporary stay at their current location work more hours." excerpt

  11. Perceptions of work stress causes and effective interventions in employees working in public, private and non-governmental organisations: a qualitative study

    PubMed Central

    Bhui, Kamaldeep; Dinos, Sokratis; Galant-Miecznikowska, Magdalena; de Jongh, Bertine; Stansfeld, Stephen

    2016-01-01

    Aims and method To identify causes of stress at work as well as individual, organisational and personal interventions used by employees to manage stress in public, private and non-governmental organizations (NGOs). Qualitative interviews were conducted with 51 employees from a range of organisations. Results Participants reported adverse working conditions and management practices as common causes of work stress. Stress-inducing management practices included unrealistic demands, lack of support, unfair treatment, low decision latitude, lack of appreciation, effort–reward imbalance, conflicting roles, lack of transparency and poor communication. Organisational interventions were perceived as effective if they improved management styles, and included physical exercise, taking breaks and ensuring adequate time for planning work tasks. Personal interventions used outside of work were important to prevent and remedy stress. Clinical implications Interventions should improve management practices as well as promoting personal interventions outside of the work setting. PMID:28377811

  12. Network Speech Systems Technology Program

    NASA Astrophysics Data System (ADS)

    Weinstein, C. J.

    1980-09-01

    This report documents work performed during FY 1980 on the DCA-sponsored Network Speech Systems Technology Program. The areas of work reported are: (1) communication systems studies in Demand-Assignment Multiple Access (DAMA), voice/data integration, and adaptive routing, in support of the evolving Defense Communications System (DCS) and Defense Switched Network (DSN); (2) a satellite/terrestrial integration design study including the functional design of voice and data interfaces to interconnect terrestrial and satellite network subsystems; and (3) voice-conferencing efforts dealing with support of the Secure Voice and Graphics Conferencing (SVGC) Test and Evaluation Program. Progress in definition and planning of experiments for the Experimental Integrated Switched Network (EISN) is detailed separately in an FY 80 Experiment Plan Supplement.

  13. Closeout Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dr. Kenneth W. Gentle

    2004-11-29

    We are conducting a collaborative research program on two tokamaks, HT-7 and EAST (Experimental Advanced Superconducting Tokamak, formerly HT-7U), with the Institute of Plasma Physics of the Chinese Academy of Sciences (CASIPP) located in Hefei, PRC. The work that we planned for this year included conducting transport experiments on HT-7, completing plans for expansion of the HT-7 diagnostic set, and reaching an agreement on how UT-FRC can best participate in experiments on HT-7U. These goals were accomplished as summarized in the next section. Note that the experimental portion of the work is still underway. The experimental campaign for HT-7 beganmore » just a few weeks before this report was compiled.« less

  14. Geospatial analysis based on GIS integrated with LADAR.

    PubMed

    Fetterman, Matt R; Freking, Robert; Fernandez-Cull, Christy; Hinkle, Christopher W; Myne, Anu; Relyea, Steven; Winslow, Jim

    2013-10-07

    In this work, we describe multi-layered analyses of a high-resolution broad-area LADAR data set in support of expeditionary activities. High-level features are extracted from the LADAR data, such as the presence and location of buildings and cars, and then these features are used to populate a GIS (geographic information system) tool. We also apply line-of-sight (LOS) analysis to develop a path-planning module. Finally, visualization is addressed and enhanced with a gesture-based control system that allows the user to navigate through the enhanced data set in a virtual immersive experience. This work has operational applications including military, security, disaster relief, and task-based robotic path planning.

  15. Experimental Plan for EDF Energy Creep Rabbit Graphite Irradiations- Rev. 2 (replaces Rev. 0 ORNL/TM/2013/49).

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burchell, Timothy D

    2014-07-01

    The experimental results obtained here will assist in the development and validation of future models of irradiation induced creep of graphite by providing the following data: Inert creep stain data from low to lifetime AGR fluence Inert creep-property data (especially CTE) from low to lifetime AGR fluence Effect of oxidation on creep modulus (by indirect comparison with experiment 1 and direct comparison with experiment 3 NB. Experiment 1 and 3 are not covered here) Data to develop a mechanistic understanding, including oAppropriate creep modulus (including pinning and high dose effects on structure) oInvestigation of CTE-creep strain behavior under inert conditionsmore » oInformation on the effect of applied stress/creep strain on crystallite orientation (requires XRD) oEffect of creep strain on micro-porosity (requires tomography & microscopy) This document describes the experimental work planned to meet the requirements of project technical specification [1] and EDF Energy requests for additional Pre-IE work. The PIE work is described in detail in this revision (Section 8 and 9).« less

  16. Subseabed Disposal Project annual report, FY85 to termination of project: Physical Oceanography and Water Column Geochemistry Studies, October 1984 through May 1986

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kupferman, S.L.

    This report covers the work of the Physical Oceanography and Water Column Geochemistry (POWCG) Studies Group of the Subseabed Disposal Project (SDP) from October 1984 to termination of the project in May 1986. The overview of the work includes an introduction, general descriptions of the activities, and a summary. Detailed discussions are included as appendices. During the period of this report the POWCG Studies Group held a meeting to develop a long-term research plan for the Nares Abyssal Plain, which was recently designated as a study area for the Environmental Study Group of the SDP. The POWCG Studies Group hasmore » also planned and participated in two interdisciplinary oceanographic missions to the Nares which have resulted in the acquisition of data and samples which can be used to begin to understand the workings of the ecosystem at the site, and for developing a preliminary site assessment. The papers in the appendices have been processed for inclusion in the Energy Data Base.« less

  17. Using Action Research to prevent work-related illness among rubber farmers in Northeastern Thailand.

    PubMed

    Sena, Wijitra; Nilvarangkul, Kessarawan; Saranrittichai, Kesinee; Smith, John F; Phajan, Teerasak; Seetangkham, Sansanee

    2018-06-10

    This research aimed to enhance self-care among rubber farmers for preventing work-related illness. The project used Action Research's four phase iterative process: fact-finding to understand the problems, action planning, action plan implementation, and evaluation and reflection on action plan impacts. Sixty-six participants (46 rubber farmers and 20 community stakeholders) were purposively recruited from two villages in the top 10 rubber producing provinces in Northeastern Thailand. Demographic and work-related illness data were collected in face-to-face structured interviews, Focus group interviews and participant observations were used to collect data in each project phase. Night group meetings were held throughout the research phases. The intervention included training workshops and establishing a community health education team for ongoing farmer support. Results showed improved farmer self-care behaviors and establishment of a community health education team to encourage farmers to care for themselves properly. Community nurses, other health personnel, and the Thai government can build on initiatives like this to strengthen occupational health and safety practices and services policy for rubber farmers. © 2018 Wiley Periodicals, Inc.

  18. Biodiversity Performs!

    ERIC Educational Resources Information Center

    World Wildlife Fund, Washington, DC.

    This document features a lesson plan in which students work in teams to act out different ecosystem services, describe several free services that biodiversity provides to human, and explain how these services make life on earth possible. Samples of instruction and assessment are included. (KHR)

  19. Parents as Role Models: Parental Behavior Affects Adolescents' Plans for Work Involvement

    ERIC Educational Resources Information Center

    Wiese, Bettina S.; Freund, Alexandra M.

    2011-01-01

    This study (N = 520 high-school students) investigates the influence of parental work involvement on adolescents' own plans regarding their future work involvement. As expected, adolescents' perceptions of parental work behavior affected their plans for own work involvement. Same-sex parents served as main role models for the adolescents' own…

  20. Considerations Taken in Developing the Frequency Assignment Guidelines for Communications in the Mars Region Provided in SFCG Recommendation 22-1, (SFCG Action Item No. 23/10)

    NASA Technical Reports Server (NTRS)

    Wang, Charles C.; Peng, Ted; Sue, Miles K.

    2004-01-01

    In the 23'd Annual SFCG meeting in San Diego, CA, the SFCG created SFCG Action Item No. 23/10 to provide a readable summary of the work done by the Mars Interim Working Group (MIWG). The SFCG created the MIWG to develop a frequency plan for future Mars missions. The working group has produced a number of documents resulting in a recommendation, SFCG Rec 22-1 [1], titled Frequency Assignment Guidelines for Communications in Mars Region, including a frequency plan for the Mars Region. This document is prepared in response to the SFCG Action Item to provide an overview of the considerations taken when selecting the frequencies and to point out where detailed information of the considerations can be found.

  1. Pretest Predictions for Phase II Ventilation Tests

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yiming Sun

    The objective of this calculation is to predict the temperatures of the ventilating air, waste package surface, and concrete pipe walls that will be developed during the Phase II ventilation tests involving various test conditions. The results will be used as inputs to validating numerical approach for modeling continuous ventilation, and be used to support the repository subsurface design. The scope of the calculation is to identify the physical mechanisms and parameters related to thermal response in the Phase II ventilation tests, and describe numerical methods that are used to calculate the effects of continuous ventilation. The calculation is limitedmore » to thermal effect only. This engineering work activity is conducted in accordance with the ''Technical Work Plan for: Subsurface Performance Testing for License Application (LA) for Fiscal Year 2001'' (CRWMS M&O 2000d). This technical work plan (TWP) includes an AP-2.21Q, ''Quality Determinations and Planning for Scientific, Engineering, and Regulatory Compliance Activities'', activity evaluation (CRWMS M&O 2000d, Addendum A) that has determined this activity is subject to the YMP quality assurance (QA) program. The calculation is developed in accordance with the AP-3.12Q procedure, ''Calculations''. Additional background information regarding this activity is contained in the ''Development Plan for Ventilation Pretest Predictive Calculation'' (DP) (CRWMS M&O 2000a).« less

  2. The role of localities in karsten’s works in architecture and city of Semarang

    NASA Astrophysics Data System (ADS)

    Sidharta Muljadinata, Albertus; Antariksa; Salura, Purnama

    2018-03-01

    Herman Thomas Karsten architectural masterpiece becomes objects of cultural heritage that must be appreciated, it covers town planning and architectural design. On progress, Karsten’s masterpiece hasn’t changed much as a result of globalization that hits Semarang city; his masterpiece is considered well, valued by the society, it is possibly because of the conceptual approach that prioritizes and blends the local aspects of wealth. Collecting data including literature study, synchronic and diachronic method, will produce a red thread ideology that influences Karsten’s way of thinking. History shows, the architectural work that survives is that have the local aspect in the concept of planning. Through the literature review of the Theory of the City and Local Aspects, and by taking the case on the cities of Karsten design, there will be a relation between the Local Aspect and the Concept of Town Planning by Karsten. Case Study in Semarang city, which is also the best or the most completed masterpiece of Karsten, becomes a reference that corresponds to the literature study, so we get the scope of the local aspect that consists of Place, People and Period always related with cultural, social and economic aspect, and all of these have correlation with the town planning and architectural work of Karsten.

  3. 45 CFR 286.75 - What must be included in the Tribal Family Assistance Plan?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... description of the employment opportunities available, in both the public and private sector, within and near the Tribal service area; and (2) A description of how the Tribe will work with public and private... 45 Public Welfare 2 2010-10-01 2010-10-01 false What must be included in the Tribal Family...

  4. Lewis and Clark Elementary School Riverview Gardens School District, St. Louis, Missouri. Profile of a Significant School.

    ERIC Educational Resources Information Center

    Gilliland, John W.

    Development of a design for a new elementary school facility is traced through evaluation of various innovative facilities. Significant features include--(1) the spiral plan form, (2) centralized core levels including teacher work center, "perception" core, and interior stream aquariam, (3) the learning laboratory classroom suites, (4) a unique…

  5. My Martian Moment - Episode 02 - Chris McKay and Perchlorates

    NASA Image and Video Library

    2015-10-06

    NASA Ames' Chris McKay is a planetary scientist, whose research includes planetary atmospheres and on the origins and evolution of life in the Solar System and the Universe. His work also includes planning the next generation of science instruments needed to better understand the chemicals and composition of the dirt on the surface of Mars.

  6. Family planning providers' perspectives on family planning service delivery in Ibadan and Kaduna, Nigeria: a qualitative study.

    PubMed

    Hebert, Luciana Estelle; Schwandt, Hilary Megan; Boulay, Marc; Skinner, Joanna

    2013-01-01

    In Nigeria, fertility continues to be high and contraceptive prevalence remains low. This study was conducted in order to understand the perceptions of, experiences with and challenges of delivering family planning services in two urban areas of Nigeria from the perspectives of family planning service providers. A qualitative study using 59 in-depth interviews was conducted among family planning providers working in hospitals, primary health centres, clinics, pharmacies and patent medicine vendors in Ibadan and Kaduna, Nigeria. Providers support a mix of individuals and organisations involved in family planning provision, including the government of Nigeria. The Nigerian government's role can take a variety of forms, including providing promotional materials for family planning facilities as well as facilitating training and educational opportunities for providers, since many providers lack basic training in family planning provision. Providers often describe their motivation to provide in terms of the health benefits offered by family planning methods. Few providers engage in any marketing of their services and many providers exclude youth and unmarried individuals from their services. The family planning provider community supports a diverse network of providers, but needs further training and support in order to improve the quality of care and market their services. Adolescents, unmarried individuals and women seeking post-abortion care are vulnerable populations that providers need to be better educated about and trained in how to serve. The perspectives of providers should be considered when designing family planning interventions in urban areas of Nigeria.

  7. Laboratory security and emergency response guidance for laboratories working with select agents. Centers for Disease Control and Prevention.

    PubMed

    Richmond, Jonathan Y; Nesby-O'Dell, Shanna L

    2002-12-06

    In recent years, concern has increased regarding use of biologic materials as agents of terrorism, but these same agents are often necessary tools in clinical and research microbiology laboratories. Traditional biosafety guidelines for laboratories have emphasized use of optimal work practices, appropriate containment equipment, well-designed facilities, and administrative controls to minimize risk of worker injury and to ensure safeguards against laboratory contamination. The guidelines discussed in this report were first published in 1999 (U.S. Department of Health and Human Services/CDC and National Institutes of Health. Biosafety in microbiological and biomedical laboratories [BMBL]. Richmond JY, McKinney RW, eds. 4th ed. Washington, DC: US Department of Health and Human Services, 1999 [Appendix F]). In that report, physical security concerns were addressed, and efforts were focused on preventing unauthorized entry to laboratory areas and preventing unauthorized removal of dangerous biologic agents from the laboratory. Appendix F of BMBL is now being revised to include additional information regarding personnel risk assessments, and inventory controls. The guidelines contained in this report are intended for laboratories working with select agents under biosafety-level 2, 3, or 4 conditions as described in Sections II and III of BMBL. These recommendations include conducting facility risk assessments and developing comprehensive security plans to minimize the probability of misuse of select agents. Risk assessments should include systematic, site-specific reviews of 1) physical security; 2) security of data and electronic technology systems; 3) employee security; 4) access controls to laboratory and animal areas; 5) procedures for agent inventory and accountability; 6) shipping/transfer and receiving of select agents; 7) unintentional incident and injury policies; 8) emergency response plans; and 9) policies that address breaches in security. The security plan should be an integral part of daily operations. All employees should be well-trained and equipped, and the plan should be reviewed annually, at least.

  8. Long Term Analysis of Deformations in Salt Mines: Kłodawa Salt Mine Case Study, Central Poland

    NASA Astrophysics Data System (ADS)

    Cała, Marek; Tajduś, Antoni; Andrusikiewicz, Wacław; Kowalski, Michał; Kolano, Malwina; Stopkowicz, Agnieszka; Cyran, Katarzyna; Jakóbczyk, Joanna

    2017-09-01

    Located in central Poland, the Kłodawa salt dome is 26 km long and about 2 km wide. Exploitation of the dome started in 1956, currently rock salt extraction is carried out in 7 mining fields and the 12 mining levels at the depth from 322 to 625 meters below sea level (m.b.s.l.). It is planned to maintain the mining activity till 2052 and extend rock salt extraction to deeper levels. The dome is characterised by complex geological structure resulted from halokinetic and tectonic processes. Projection of the 3D numerical analysis took into account the following factors: mine working distribution within the Kłodawa mine (about 1000 rooms, 350 km of galleries), complex geological structure of the salt dome, complicated structure and geometry of mine workings and distinction in rocks mechanical properties e.g. rock salt and anhydrite. Analysis of past mine workings deformation and prediction of future rock mass behaviour was divided into four stages: building of the 3D model (state of mine workings in year 2014), model extension of the future mine workings planned for extraction in years 2015-2052, the 3D model calibration and stability analysis of all mine workings. The 3D numerical model of Kłodawa salt mine included extracted and planned mine workings in 7 mining fields and 14 mining levels (about 2000 mine workings). The dimensions of the model were 4200 m × 4700 m × 1200 m what was simulated by 33 million elements. The 3D model was calibrated on the grounds of convergence measurements and laboratory tests. Stability assessment of mine workings was based on analysis of the strength/stress ratio and vertical stress. The strength/stress ratio analysis enabled to indicate endangered area in mine workings and can be defined as the factor of safety. Mine workings in state close to collapse are indicated by the strength/stress ratio equals 1. Analysis of the vertical stress in mine workings produced the estimation of current state of stress in comparison to initial (pre-mining) conditions. The long-term deformation analysis of the Kłodawa salt mine for year 2014 revealed that stability conditions were fulfilled. Local disturbances indicated in the numerical analysis were connected with high chambers included in the mining field no 1 and complex geological structure in the vicinity of mine workings located in the mining fields no 2 and 3. Moreover, numerical simulations that projected the future extraction progress (till year 2052) showed positive performance. Local weakness zones in the mining field no 7 are associated with occurrence of carnallite layers and intensive mining which are planned in the mining field no 6 at the end of rock salt extraction.

  9. RMA Abandoned Well Closure Program. Final Task Plan, Version 3.0.

    DTIC Science & Technology

    1989-05-01

    20503. 1 . AGENCY USE ONLY (Leave blank) 2. REPORT DATE" 0 3. REPORT TYPE AND DATES COVERED _T 05/00/89 __________________ 4. TITLE AND SUBTITLE S...AQUIFERS. THE SCOPE OF WORK INCLUDES: 1 . COMPILATION OF A WELL INVENTORY AND DATABASE 2. FIELD LOCATION OF WELLS 3. CLEANING AND CLOSURE OF...APPROXIMATELY 350 WELT- 4. DOCUMENTATION OF CLOSURE ACTIVITIES. SECTIONS OF THIS TASK PLAN DETAIL-INFORMATION ON: 1 . ABANDONED WELL IDENTIFICATION AND LOCATION

  10. Comment.

    PubMed

    Cossey, D

    1993-01-01

    In the UK, the Chairwoman of the Family Planning Association (FPA) praises the staff and volunteers with whom she has worked for their incessant inability to meet the many challenges they face. During her 6 years, however, the FPA had to reduce the number of regional offices and staff. It did not need to reduce salaries, however. FPA membership directly elects the National Executive Council which is now smaller. FPA is exploring new sources of funding and is adapting to the purchaser/provider relationship in the statutory sector, resulting in its successful financial strategy. The Department of Health helps in maintaining FPA's ability to continue to operate. The Chairwoman sees indications of needing to fight old battles again, e.g., some officials have suggested limiting the range of oral contraceptives available from prescription by the National Health Services (NHS) which would be the end of almost 20 years of free contraception and free choice under the NHS. The government is not open to including sex education the school curriculum. The NHS gives the impression in its report "The Health of the Nation" that it is committed to reducing adolescent pregnancies among the youngest teenagers and to recognizing the importance of good policies on sexual health. Yet, its actions exhibit no compassion for single parents. Participants at FPA's 1992 conference agree that variety, quality, and sensitivity of family planning provisions are needed and that family planning clinics and general practitioners should work together. FPA has contributed to the UK the clinic network; the concept of family planning being an integral part of a comprehensive health service; and the notion that family planning includes contraception, empowerment of women, sexual health, rights, and responsibilities. FPA should reaffirm these ideas and secure the future for informed choice and planned pregnancy.

  11. Tsunami Preparedness, Response, Mitigation, and Recovery Planning in California

    NASA Astrophysics Data System (ADS)

    Miller, K.; Wilson, R. I.; Johnson, L. A.; Mccrink, T. P.; Schaffer, E.; Bower, D.; Davis, M.

    2016-12-01

    In California officials of state, federal, and local governments have coordinated to implement a Tsunami Preparedness and Mitigation Program. Building upon past preparedness efforts carried out year-round this group has leveraged government support at all levels. A primary goal is for everyone who lives at or visits the coast to understand basic life-safety measures when responding to official tsunami alerts or natural warnings. Preparedness actions include: observation of National Tsunami Preparedness Week, local "tsunami walk" drills, scenario-based exercises, testing of notification systems for public alert messaging, outreach materials, workshops, presentations, and media events.Program partners have worked together to develop emergency operations, evacuation plans, and tsunami annexes to plans for counties, cities, communities, and harbors in 20 counties along the coast. Working with the state and federal partner agencies, coastal communities have begun to incorporate sophisticated tsunami "Playbook" scenario information into their planning. These innovative tsunami evacuation and response tools provide detailed evacuation maps and associated real-time response information for identifying areas where flooding could occur. This is critical information for evacuating populations on land, near the shoreline.Acting on recommendations from the recent USGS-led, multi-discipline Science Application for Risk Reduction Tsunami Scenario report on impacts to California and American Society of Civil Engineering adoption proposals to the International Building Code, the state has begun to develop a strategy to incorporate probabilistic tsunami findings into state level policy recommendations for addressing building code adoption, as well as approach land use planning and building code implementation in local jurisdictions. Additional efforts, in the context of sustained community resiliency, include developing recovery planning guidance for local communities.

  12. Urban Climate Map System for Dutch spatial planning

    NASA Astrophysics Data System (ADS)

    Ren, Chao; Spit, Tejo; Lenzholzer, Sanda; Yim, Hung Lam Steve; Heusinkveld, Bert; van Hove, Bert; Chen, Liang; Kupski, Sebastian; Burghardt, René; Katzschner, Lutz

    2012-08-01

    Facing climate change and global warming, outdoor climatic environment is an important consideration factor for planners and policy makers because improving it can greatly contribute to achieve citizen's thermal comfort and create a better urban living quality for adaptation. Thus, the climatic information must be assessed systematically and applied strategically into the planning process. This paper presents a tool named Urban Climate Map System (UCMS) that has proven capable of helping compact cities to incorporate climate effects in planning processes in a systematic way. UCMS is developed and presented in a Geographic Information System (GIS) platform in which the lessons learned and experience gained from interdisciplinary studies can be included. The methodology of UCMS of compact cities, the construction procedure, and the basic input factors - including the natural climate resources and planning data - are described. Some literatures that shed light on the applicability of UMCS are reported. The Municipality of Arnhem is one of Dutch compact urban areas and still under fast urban development and urban renewal. There is an urgent need for local planners and policy makers to protect local climate and open landscape resources and make climate change adaptation in urban construction. Thus, Arnhem is chosen to carry out a case study of UCMS. Although it is the first work of Urban Climatic Mapping in The Netherlands, it serves as a useful climatic information platform to local planners and policy makers for their daily on-going works. We attempt to use a quick method to collect available climatic and planning data and create an information platform for planning use. It relies mostly on literature and theoretical understanding that has been well practiced elsewhere. The effort here is to synergize the established understanding for a case at hand and demonstrate how useful guidance can still be made for planners and policy makers.

  13. The Effectiveness of Teacher Work between Permanent and Non-Permanent Teachers on the Implementation of School-Based Management in Muhammadiyah Metro Elementary School

    ERIC Educational Resources Information Center

    Juhri, A. M.; Tri, Y. H.; Agus, S.

    2017-01-01

    The study aims to obtain empirical evidence of the differences in the effectiveness of work on several aspects, including preparing and planning learning activities, the implementation of public administration, responsibility, and task. The study was carried out between the two groups, which were permanent and nonpermanent teachers in Muhamamdiyah…

  14. Social Factors in the Health of Families: A Public Health Social Work Responsibility. Proceedings of a Conference (Pittsburgh, Pennsylvania, March 23-26, 1986).

    ERIC Educational Resources Information Center

    St. Denis, Gerald C., Ed.

    This document contains a list of planning committee members, institute participants, an introduction by Gerald C. St. Denis a program agenda, and institute presentations from this conference. The following presentations are included: (1) "Social Factors in the Health of Families: A Public Health Social Work Responsibility" (Stanley F. Battle); (2)…

  15. Work-Related Demands and Life Satisfaction: The Effects of Engagement and Disengagement among Employed and Long-Term Unemployed People

    ERIC Educational Resources Information Center

    Korner, Astrid; Reitzle, Matthias; Silbereisen, Rainer K.

    2012-01-01

    Social change has accentuated various demands in people's work lives including, for instance, fears of being laid off, anticipated or experienced difficulties in finding a new and/or appropriate job or a lack of security in career planning. The present study on N=1751 employed, short-term unemployed, and long-term (greater than 12 months)…

  16. Emergency Warning Systems. Part 2. Warning Systems - Evaluation Guidelines.

    DTIC Science & Technology

    1983-07-01

    ELEMENT. PROJECT. TASK AREA A WORK UNIT NUMBERS PRC Voorhees Work Unit 2234G 1500 Planning Research Drive McLean, Virginia 22102 ___ 11. CONTROLLING ...different from Controlling Office) IS. SECURITY CLASS. (of this report) Unclassified 15a. DECLASSIFICATION/DOWNGRADING SCHEDULE 16. DISTRIBUTION...systems that control these warning systems are discussed. Test results of several warning systems are included along with a discussion of sound

  17. Investigation of the Reverse Water Gas Shift Reaction for Production of Oxygen From Mars Atmospheric Carbon Dioxide

    NASA Technical Reports Server (NTRS)

    Meyer, Tom; Zubrin, Robert

    1997-01-01

    The first phase of the research includes a comprehensive analytical study examining the potential applications for engineering subsystems and mission strategies made possible by such RWGS based subsystems, and will include an actual experimental demonstration and performance characterization of a full-scale brassboard RWGS working unit. By the time of this presentation the laboratory demonstration unit will not yet be operational but we will present the results of our analytical studies to date and plans for the ongoing work.

  18. Planning that works: Empowerment through stakeholder focused interactive planning (SFIP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Beck, J.E.; Ison, S.A.

    1994-12-31

    This paper describes a powerful planning tool that can enable government, private industries, and public interest organizations to actualize their visions through sound decision making. The stakeholder focused interactive planning model is designed to integrate and ultimately gain stakeholder investment in the success of attainment of their vision. The only concessions required of the planning organization using this process is the acceptance of the premise that sustained vision success requires the support of both internal and external stakeholders and that each step in the process must be used as a validation of the previous step and essential to the completionmore » of the next step. What is stakeholder/public involvement? It is the process in which the stakeholders (both internal and external) values, interests and expectations are included in decision-making processes. The primary goal of public involvement efforts is to include all those who have a stake in the decision, whether or not they have already been identified. Stakeholders are individuals, contractors, clients, suppliers, public organizations, state and local governments, Indian tribes, federal agencies, and other parties affected by decisions.« less

  19. The 1981 Argentina ground data collection

    NASA Technical Reports Server (NTRS)

    Horvath, R.; Colwell, R. N. (Principal Investigator); Hicks, D.; Sellman, B.; Sheffner, E.; Thomas, G.; Wood, B.

    1981-01-01

    Over 600 fields in the corn, soybean and wheat growing regions of the Argentine pampa were categorized by crop or cover type and ancillary data including crop calendars, historical crop production statistics and certain cropping practices were also gathered. A summary of the field work undertaken is included along with a country overview, a chronology of field trip planning and field work events, and the field work inventory of selected sample segments. LANDSAT images were annotated and used as the field work base and several hundred ground and aerial photographs were taken. These items along with segment descriptions are presented. Meetings were held with officials of the State Secretariat of Agriculture (SEAG) and the National Commission on Space Investigations (CNIE), and their support to the program are described.

  20. The crucial role of the private sector.

    PubMed

    Barberis, M; Paxman, J M

    1986-12-01

    Private support for the development of family planning programs continues to grow and now includes industries that provide family planning services, commercial outlets that distribute contraceptives, community groups that help to build demand, private medical practitioners who include contraception as a part of health care, organizations that provide technical and financial assistance to developing country programs, pharmaceutical firms, and foundations that underwrite contraceptive research. Although the mix of private and public programs differs from country to country, these 2 family planning programs complement each other and often work in close partnership. The private sector has the advantages of being able to pioneer innovative programs the public sector is unwilling or unable to pursue, to bring foreign financial and technical assistance to developing countries without political implications, and to achieve financially self-sustaining family planning efforts that are linked to other development efforts. In many countries, the private sector has been instrumental in developing a national family planning program and in eliminating barriers to family planning in countries with restrictive laws and policies. The private sector has been especially important in pioneering grassroots programs that improve the status of women through education, health care, training, and economic opportunity.

  1. Mission Operations of the Mars Exploration Rovers

    NASA Technical Reports Server (NTRS)

    Bass, Deborah; Lauback, Sharon; Mishkin, Andrew; Limonadi, Daniel

    2007-01-01

    A document describes a system of processes involved in planning, commanding, and monitoring operations of the rovers Spirit and Opportunity of the Mars Exploration Rover mission. The system is designed to minimize command turnaround time, given that inherent uncertainties in terrain conditions and in successful completion of planned landed spacecraft motions preclude planning of some spacecraft activities until the results of prior activities are known by the ground-based operations team. The processes are partitioned into those (designated as tactical) that must be tied to the Martian clock and those (designated strategic) that can, without loss, be completed in a more leisurely fashion. The tactical processes include assessment of downlinked data, refinement and validation of activity plans, sequencing of commands, and integration and validation of sequences. Strategic processes include communications planning and generation of long-term activity plans. The primary benefit of this partition is to enable the tactical portion of the team to focus solely on tasks that contribute directly to meeting the deadlines for commanding the rover s each sol (1 sol = 1 Martian day) - achieving a turnaround time of 18 hours or less, while facilitating strategic team interactions with other organizations that do not work on a Mars time schedule.

  2. Integrating pharmacies into public health program planning for pandemic influenza vaccine response.

    PubMed

    Fitzgerald, Thomas J; Kang, Yoonjae; Bridges, Carolyn B; Talbert, Todd; Vagi, Sara J; Lamont, Brock; Graitcer, Samuel B

    2016-11-04

    During an influenza pandemic, to achieve early and rapid vaccination coverage and maximize the benefit of an immunization campaign, partnerships between public health agencies and vaccine providers are essential. Immunizing pharmacists represent an important group for expanding access to pandemic vaccination. However, little is known about nationwide coordination between public health programs and pharmacies for pandemic vaccine response planning. To assess relationships and planning activities between public health programs and pharmacies, we analyzed data from Centers for Disease Control and Prevention assessments of jurisdictions that received immunization and emergency preparedness funding from 2012 to 2015. Forty-seven (88.7%) of 53 jurisdictions reported including pharmacies in pandemic vaccine distribution plans, 24 (45.3%) had processes to recruit pharmacists to vaccinate, and 16 (30.8%) of 52 established formal relationships with pharmacies. Most jurisdictions plan to allocate less than 10% of pandemic vaccine supply to pharmacies. While most jurisdictions plan to include pharmacies as pandemic vaccine providers, work is needed to establish formalized agreements between public health departments and pharmacies to improve pandemic preparedness coordination and ensure that vaccinating pharmacists are fully utilized during a pandemic. Copyright © 2016 Elsevier Ltd. All rights reserved.

  3. Family planning management of the floating population in Xi'an city.

    PubMed

    1996-12-01

    This article describes the population of migrants living in Xincheng District of Xi'an City, China. Xincheng district is a commercial center that includes the largest wholesale market in northwest China, Kangfulu Market in Sanfuwan village. The resident population of the district amounts to about 450,000 people. 72,000 additional population are the floating population of migrants, of whom about 50% are women of childbearing age. The district established stringent family planning policies in order to limit unplanned childbearing. Family planning policies were the collaborative work among staff members from departments of industry and commerce, labor, education, finance, public health, civil affairs, family planning, and other related agencies. Management of family planning is based on subdistrict committees, resident committees, and local permanent population. These individuals and groups provide registration for temporary residence, verify birth certificates, establish contraceptive status, and encourage landlords to disseminate birth control information among their tenants. The population around Kangfulu Market includes about 800 permanent residents and about 3000- 6000 migrants. The village authorities provide family planning and medical services free of charge to migrants. Villagers register migrant children in schools and offer business help to the newcomers. These efforts have contributed to fewer births among migrants.

  4. Advocacy for International Family Planning: What Terminology Works?

    PubMed

    Huber, Douglas; Martin, Raymond; Bormet, Mona

    Advocating for international family planning while avoiding miscommunications with politically and religiously conservative policy makers and the public requires care and clarity with language. We find that terms such as "international family planning" are well received when the meaning is clearly explained, such as "enabling couples to determine the number and timing of pregnancies, including the voluntary use of methods for preventing pregnancy - not including abortion - harmonious with their beliefs and values". Family planning also helps reduce abortions - a powerful message for conservative policy makers and the public. We concur with Dyer et al. (2016) that the messenger is important; we find that many of the most effective advocates are religious leaders and faith-based health providers from the Global South. They know and validate the importance of family planning for improving family health and reducing abortions in their communities. "Healthy timing and spacing of pregnancy" is positive language for policy makers, especially when describing the health impact for women and children. Universal access to contraceptive services is emerging as vital for family health and also to help achieve the Sustainable Development Goals (UN 2015). Language on international family planning will evolve, and clarity of meaning will be foundational for effective advocacy.

  5. Training Planning and Working Memory in Third Graders

    ERIC Educational Resources Information Center

    Goldin, Andrea Paula; Segretin, Maria Soledad; Hermida, Maria Julia; Paz, Luciano; Lipina, Sebastian Javier; Sigman, Mariano

    2013-01-01

    Working memory and planning are fundamental cognitive skills supporting fluid reasoning. We show that 2 games that train working memory and planning skills in school-aged children promote transfer to 2 different tasks: an attentional test and a fluid reasoning test. We also show long-term improvement of planning and memory capacities in…

  6. Satellite Power Systems (SPS) concept definition study (exhibit C)

    NASA Technical Reports Server (NTRS)

    Hanley, G. M.

    1978-01-01

    A coplanar satellite conceptual approach was defined. This effort included several trade studies related to satellite design and also construction approaches for this satellite. A transportation system, consistent with this concept, was also studied, including an electric orbit transfer vehicle and a parallel-burn heavy lift launch vehicle. Work on a solid state microwave concept continued and several alternative approaches were evaluated. Computer determination of an optimized transistor and circuit design was also continued. Experiment/verification planning resulted in the development of a total solar array and microwave technology development plan, as well as definition of near-term research to evaluate key technology issues.

  7. The teratology society 2012-2017 strategic plan: pushing the boundaries.

    PubMed

    Curran, Christine Perdan; Lau, Christopher; Schellpfeffer, Michael A; Stodgell, Christopher J; Carney, Edward W

    2013-01-01

    The Teratology Society held its fourth strategic planning session in Albuquerque, NM, April 10-12, 2012, and launched the 2012-2017 Strategic Plan in conjunction with the 2012 annual meeting in Baltimore, MD. Building on the energy of the successful implementation of prior strategic plans (San Diego, 2007; Nashville,TN 2002; Cincinnati, OH 1998), session participants worked to identify barriers to success as a scientific society, as well as impending challenges and opportunities to which the Society needs to respond. The following report provides an overview of the Strategic Planning process, objectives, activities, and conclusions. A total of 23 members were present at the session, and the group included representation from Council, various committees, and different member constituencies. This plan, Pushing the Boundaries, and its three strategic intents: Broaden Our Identity, Expand Our Membership, and Increase Our Influence, will drive the direction of the Teratology Society for the next five years. Copyright © 2013 Wiley Periodicals, Inc.

  8. Translations on People’s Republic of China, Number 379

    DTIC Science & Technology

    1977-05-03

    TECHNOLOGICAL Family Planning, Birth Control Linked to Learning- From-Ta-chai (Various sources, various dates) 18 Family Planning Work Well Done in...Nan-kung-hsien Female Labor Force Liberated Through Birth Control Two Counties Hailed for Good Family Planning Work Careful Records Kept on Women...CSO: 4006 17 SCIENTIFIC AND TECHNOLOGICAL FAMILY PLANNING, BIRTH CONTROL LINKED TO LEARNING-FROM-TA-CHAI Family Planning Work Well Done in Nan-kung

  9. Integrating human resources and program-planning strategies.

    PubMed

    Smith, J E

    1989-06-01

    The integration of human resources management (HRM) strategies with long-term program-planning strategies in hospital pharmacy departments is described. HRM is a behaviorally based, comprehensive strategy for the effective management and use of people that seeks to achieve coordination and integration with overall planning strategies and other managerial functions. It encompasses forecasting of staffing requirements; determining work-related factors that are strong "motivators" and thus contribute to employee productivity and job satisfaction; conducting a departmental personnel and skills inventory; employee career planning and development, including training and education programs; strategies for promotion and succession, including routes of advancement that provide alternatives to the managerial route; and recruitment and selection of new personnel to meet changing departmental needs. Increased competitiveness among hospitals and a shortage of pharmacists make it imperative that hospital pharmacy managers create strategies to attract, develop, and retain the right individuals to enable the department--and the hospital as a whole--to grow and change in response to the changing health-care environment in the United States. Pharmacy managers would be greatly aided in this mission by the establishment of a well-defined, national strategic plan for pharmacy programs and services that includes an analysis of what education and training are necessary for their successful accomplishment. Creation of links between overall program objectives and people-planning strategies will aid hospital pharmacy departments in maximizing the long-term effectiveness of their practice.

  10. Comparison of Cognitive Change after Working Memory Training and Logic and Planning Training in Healthy Older Adults.

    PubMed

    Goghari, Vina M; Lawlor-Savage, Linette

    2017-01-01

    Recent attention has focused on the benefits of cognitive training in healthy adults. Many commercial cognitive training programs are available given the attraction of not only bettering one's cognitive capacity, but also potentially preventing age-related declines, which is of particular interest to older adults. The issue of whether cognitive training can improve performance within cognitive domains not trained (i.e., far transfer) is controversial, with meta-analyses of cognitive training both supporting and falsifying this claim. More support is present for the near transfer (i.e., transfer in cognitive domain trained) of cognitive training; however, not in all studies. To date, no studies have compared working memory training to training higher-level processes themselves, namely logic and planning. We studied 97 healthy older adults above the age of 65. Healthy older adults completed either an 8-week web-based cognitive training program on working memory or logic and planning. An additional no-training control group completed two assessments 8-weeks apart. Participants were assessed on cognitive measures of near and far transfer, including working memory, planning, reasoning, processing speed, verbal fluency, cognitive flexibility, and creativity. Participants improved on the trained tasks from the first day to last day of training. Bayesian analyses demonstrated no near or far transfer effects after cognitive training. These results support the conclusion that performance-adaptive computerized cognitive training may not enhance cognition in healthy older adults. Our lack of findings could be due to a variety of reasons, including studying a cohort of healthy older adults that were performing near their cognitive ceiling, employing a training protocol that was not sufficient to produce a change, or that no true findings exist. Research suggests numerous study factors that can moderate the results. In addition, the role of psychological variables, such as expectations and motivation to train, are critical in understanding the effects of cognitive training.

  11. IPPF Charter on Sexual and Reproductive Rights. International Planned Parenthood Federation.

    PubMed

    Newman, K; Helzner, J F

    1999-05-01

    For most of human existence and in most societies, women have been considered to be property and subject to men. Throughout history, with such notable exceptions as Queen Boadicea, Eleanor of Aquitaine, Elizabeth I of England, and Catherine the Great of Russia, women had little or no power until early in the 20th century when the women's suffrage movement was successful in the United States and in some European countries. As women have gained political rights, groups of women have sought sexual and reproductive rights, as exemplified by the feminist movement of the past few decades in the United States. Although marked strides toward achievement of reproductive choice have been taken in high-income countries, there remain major strictures to reproductive freedom for women in low-income countries. This area, which is replete with ethical and moral issues, has been addressed by the International Planned Parenthood Foundation (IPPF), which has worked to improve the sexual and reproductive health of women throughout the world. The IPPF Charter on Sexual and Reproductive Rights is a paradigm for both women's rights and human rights. Karen Newman is policy adviser with the IPPF and has codrafted the IPPF Charter on Sexual and Reproductive Rights together with two lawyers. She has held several positions within the IPPF, including medical researcher, press officer, and programme adviser in Europe, where she had responsibility for working with new family planning associations (FPAs) in the Czech Republic and Slovakia. At present, she is working to increase the capacity of IPPF member FPAs to undertake human rights-based advocacy for sexual and reproductive health and rights. Judith F. Helzner is director of Sexual and Reproductive Health at International Planned Parenthood Federation/Western Hemisphere Region, Inc., where she has worked since 1987. She holds M.A. degrees from the University of Pennsylvania in International Relations and Demography. Her previous employment includes the Pathfinder Fund and the International Women's Health Coalition.

  12. Radiation oncology: a primer for medical students.

    PubMed

    Berman, Abigail T; Plastaras, John P; Vapiwala, Neha

    2013-09-01

    Radiation oncology requires a complex understanding of cancer biology, radiation physics, and clinical care. This paper equips the medical student to understand the fundamentals of radiation oncology, first with an introduction to cancer treatment and the use of radiation therapy. Considerations during radiation oncology consultations are discussed extensively with an emphasis on how to formulate an assessment and plan including which treatment modality to use. The treatment planning aspects of radiation oncology are then discussed with a brief introduction to how radiation works, followed by a detailed explanation of the nuances of simulation, including different imaging modalities, immobilization, and accounting for motion. The medical student is then instructed on how to participate in contouring, plan generation and evaluation, and the delivery of radiation on the machine. Lastly, potential adverse effects of radiation are discussed with a particular focus on the on-treatment patient.

  13. 7 CFR 622.2 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., water quality management, ground water supply, agricultural pollution control, and other water management. (d) After a final plan for works of improvement is agreed upon between NRCS and the sponsors and... proper utilization of land, flood prevention, agricultural water management including irrigation and...

  14. Development of an interactive GIS based work zone traffic control tool.

    DOT National Transportation Integrated Search

    2013-08-01

    The purpose of this study was to include consideration for intersections into the previously created GIS traffic control planning tool. Available data for making intersection control calculations were collected and integrated into the design of the t...

  15. 23 CFR 656.5 - Eligibility.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... carpool lanes. Eligible work may include preliminary engineering to determine traffic flow and design criteria, signing, pavement markings, traffic control devices, and minor physical modifications to permit... any existing or planned mass transportation service, but should be designed so that the facility could...

  16. 23 CFR 656.5 - Eligibility.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... carpool lanes. Eligible work may include preliminary engineering to determine traffic flow and design criteria, signing, pavement markings, traffic control devices, and minor physical modifications to permit... any existing or planned mass transportation service, but should be designed so that the facility could...

  17. 23 CFR 656.5 - Eligibility.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... carpool lanes. Eligible work may include preliminary engineering to determine traffic flow and design criteria, signing, pavement markings, traffic control devices, and minor physical modifications to permit... any existing or planned mass transportation service, but should be designed so that the facility could...

  18. 23 CFR 656.5 - Eligibility.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... carpool lanes. Eligible work may include preliminary engineering to determine traffic flow and design criteria, signing, pavement markings, traffic control devices, and minor physical modifications to permit... any existing or planned mass transportation service, but should be designed so that the facility could...

  19. 23 CFR 656.5 - Eligibility.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... carpool lanes. Eligible work may include preliminary engineering to determine traffic flow and design criteria, signing, pavement markings, traffic control devices, and minor physical modifications to permit... any existing or planned mass transportation service, but should be designed so that the facility could...

  20. 36 CFR 219.30 - Plan documentation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... also contains maps, monitoring and evaluation results, the annual monitoring and evaluation report, and... overall strategy for maintenance or restoration of sustainability, including desired conditions and... annual monitoring and evaluation report; and (6) A summary of the projected program of work, updated...

  1. Laboratory Equipment Criteria.

    ERIC Educational Resources Information Center

    State Univ. Construction Fund, Albany, NY.

    Requirements for planning, designing, constructing and installing laboratory furniture are given in conjunction with establishing facility criteria for housing laboratory equipment. Furniture and equipment described include--(1) center tables, (2) reagent racks, (3) laboratory benches and their mechanical fixtures, (4) sink and work counters, (5)…

  2. How To Stay Stuck in the Wrong Career.

    ERIC Educational Resources Information Center

    Ibarra, Herminia

    2002-01-01

    An effective midlife career change is challenging to bring about successfully. Identity and its relationship to work are key factors. A three-point plan to a successful career change includes the following: know thyself, consult trusted advisors, and think big. (JOW)

  3. Enhance Your Employee Benefits Package with a 529 College Savings Plan.

    ERIC Educational Resources Information Center

    Stott, Gregory D.

    2003-01-01

    Recommends the establishment of a 529 college-savings program as part of a school district employee-benefits package. Includes how it works, the benefits to employees, the advantages to school districts, and how to get started. (PKP)

  4. 48 CFR 307.7108 - Statement of work.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Statement of work. 307... ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Plan 307.7108 Statement of work. (a) General. An SOW describes the work or services a contractor is to perform in reaching an end result without describing the...

  5. 7 CFR 1710.255 - Energy efficiency work plans-energy efficiency borrowers.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 11 2014-01-01 2014-01-01 false Energy efficiency work plans-energy efficiency... TO ELECTRIC LOANS AND GUARANTEES Construction Work Plans and Related Studies § 1710.255 Energy efficiency work plans—energy efficiency borrowers. (a) All energy efficiency borrowers must maintain a...

  6. Hood River and Pelton Ladder Evaluation Studies : Annual Report 1994.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Olsen, Erik A.; French, Rod A.; Ritchey, Alan D.

    1995-09-01

    In 1992, the Northwest Power Planning Council approved the Hood River and Pelton ladder master plans within the framework of the Columbia River Basin Fish and Wildlife Program. The master plans define an approach for implementing a hatchery supplementation program in the Hood River subbasin. The hatchery program as defined in the master plans is called the Hood River Hatchery Production Program (HRPP). The HRPP will be phased in over several years and will be jointly implemented by the Oregon Department of Fish and Wildlife (ODFW) and the Confederated Tribes of the Warm Springs (CTWS) Reservation. In December 1991, amore » monitoring and evaluation program was implemented in the Hood River subbasin to collect life history and production information on stocks of anadromous salmonids returning to the Hood River subbasin. The program was implemented to provide the baseline information needed to: (1) evaluate various management options for implementing the HRPP and (2) determine any post-project impacts the HRPP has on indigenous populations of resident fish. Information collected during the 1992-94 fiscal years will also be used to prepare an environmental impact statement (EIS) evaluating the program`s impact on the human environment. To begin construction on project facilities, it was proposed that the HRPP be implemented in two phases. Phase I would include work that would fall under a {open_quotes}categorical exclusion{close_quotes} from NEPA, and Phase II would include work requiring an EIS prior to implementation. This report summarizes the life history and escapement data collected in the Hood River subbasin and the status work of implemented under Phase I of the HR Life history and escapement data will be used to: (1) test the assumptions on which harvest and escapement goals for the Hood River and Pelton ladder master plans are based and (2) develop biologically based management recommendations for implementing the HRPP.« less

  7. Strategic planning for employee happiness: a business goal for human service organizations.

    PubMed

    Howard, B; Gould, K E

    2000-09-01

    Employee happiness can impact substantially on an organization's performance. It can influence employee retention, absenteeism, and work performance. Because of this importance, such happiness is inseparable from the real business of the organization and should be considered a business goal. Implementation and development of the strategic plan associated with this goal becomes the responsibility of a highly placed project team that has as its mission ensuring employee satisfaction. The strategic plan includes procedures that allow management to listen effectively to employees, assessing and responding to their values and needs. In this paper we discuss the workforce and environmental characteristics that are involved planning for employee happiness and the steps in creating an organizational culture in which this can become a business goal.

  8. Standardized emergency management system and response to a smallpox emergency.

    PubMed

    Kim-Farley, Robert J; Celentano, John T; Gunter, Carol; Jones, Jessica W; Stone, Rogelio A; Aller, Raymond D; Mascola, Laurene; Grigsby, Sharon F; Fielding, Jonathan E

    2003-01-01

    The smallpox virus is a high-priority, Category-A agent that poses a global, terrorism security risk because it: (1) easily can be disseminated and transmitted from person to person; (2) results in high mortality rates and has the potential for a major public health impact; (3) might cause public panic and social disruption; and (4) requires special action for public health preparedness. In recognition of this risk, the Los Angeles County Department of Health Services (LAC-DHS) developed the Smallpox Preparedness, Response, and Recovery Plan for LAC to prepare for the possibility of an outbreak of smallpox. A unique feature of the LAC-DHS plan is its explicit use of the Standardized Emergency Management System (SEMS) framework for detailing the functions needed to respond to a smallpox emergency. The SEMS includes the Incident Command System (ICS) structure (management, operations, planning/intelligence, logistics, and finance/administration), the mutual-aid system, and the multi/interagency coordination required during a smallpox emergency. Management for incident command includes setting objectives and priorities, information (risk communications), safety, and liaison. Operations includes control and containment of a smallpox outbreak including ring vaccination, mass vaccination, adverse events monitoring and assessment, management of confirmed and suspected smallpox cases, contact tracing, active surveillance teams and enhanced hospital-based surveillance, and decontamination. Planning/intelligence functions include developing the incident action plan, epidemiological investigation and analysis of smallpox cases, and epidemiological assessment of the vaccination coverage status of populations at risk. Logistics functions include receiving, handling, inventorying, and distributing smallpox vaccine and vaccination clinic supplies; personnel; transportation; communications; and health care of personnel. Finally, finance/administration functions include monitoring costs related to the smallpox emergency, procurement, and administrative aspects that are not handled by other functional divisions of incident command systems. The plan was developed and is under frequent review by the LAC-DHS Smallpox Planning Working Group, and is reviewed periodically by the LAC Bioterrorism Advisory Committee, and draws upon the Smallpox Response Plan and Guidelines of the Centers for Disease Control and Prevention (CDC) and recommendations of the Advisory Committee on Immunization Practices (ACIP). The Smallpox Preparedness, Response, and Recovery Plan, with its SEMS framework and ICS structure, now is serving as a model for the development of LAC-DHS plans for responses to other terrorist or natural-outbreak responses.

  9. The costs of changing an intended action: movement planning, but not execution, interferes with verbal working memory.

    PubMed

    Spiegel, M A; Koester, D; Weigelt, M; Schack, T

    2012-02-16

    How much cognitive effort does it take to change a movement plan? In previous studies, it has been shown that humans plan and represent actions in advance, but it remains unclear whether or not action planning and verbal working memory share cognitive resources. Using a novel experimental paradigm, we combined in two experiments a grasp-to-place task with a verbal working memory task. Participants planned a placing movement toward one of two target positions and subsequently encoded and maintained visually presented letters. Both experiments revealed that re-planning the intended action reduced letter recall performance; execution time, however, was not influenced by action modifications. The results of Experiment 2 suggest that the action's interference with verbal working memory arose during the planning rather than the execution phase of the movement. Together, our results strongly suggest that movement planning and verbal working memory share common cognitive resources. Copyright © 2011 Elsevier Ireland Ltd. All rights reserved.

  10. Assessment of the Monitor Unit Objective tool for VMAT in the Eclipse treatment planning system.

    PubMed

    Jiménez-Puertas, Sara; Sánchez-Artuñedo, David; Hermida-López, Marcelino

    2018-01-01

    This work aims to achieve the highest possible monitor units (MU) reduction using the MU Objective tool included in the Eclipse treatment planning system, while preserving the plan quality. The treatment planning system Eclipse (Varian Medical Systems, Palo Alto, CA) includes a control mechanism for the number of monitor units of volumetric modulated arc therapy (VMAT) plans, named the MU Objective tool. Forty prostate plans, 20 gynecological plans and 20 head and neck plans designed with VMAT were retrospectively studied. Each plan ( base plan ) was optimized without using the MU Objective tool, and it was re-optimized with different values of the Maximum MU ( MaxMU ) parameter of the MU Objective tool. MU differences were analyzed with a paired samples t -test and changes in plan quality were assessed with a set of parameters for OARs and PTVs. The average relative MU difference [Formula: see text] considering all treatment sites, was the highest when MaxMU  = 400 (-4.2%, p  < 0.001). For prostate plans, the lowest [Formula: see text] was obtained (-3.7%, p  < 0.001). For head and neck plans [Formula: see text] was -7.3% ( p  < 0.001) and for gynecological plans [Formula: see text] was 7.0% ( p  = 0.002). Although similar MU reductions were observed for both sites, for some gynecological plans maximum differences were greater than 10%. All the assessed parameters for PTVs and OARs sparing showed average differences below 2%. For the three studied clinical sites, establishing MaxMU  = 400 led to the optimum MU reduction, maintaining the original dose distribution and dosimetric parameters practically unaltered.

  11. What Specific Facets of Executive Function are Associated with Academic Functioning in Youth with Attention-Deficit/Hyperactivity Disorder?

    PubMed Central

    Langberg, Joshua M.; Dvorsky, Melissa R.; Evans, Steven W.

    2013-01-01

    The purpose of the study was to evaluate the relation between ratings of Executive Function (EF) and academic functioning in a sample of 94 middle-school-aged youth with Attention-Deficit/Hyperactivity Disorder (ADHD; Mage = 11.9; 78% male; 21% minority). This study builds on prior work by evaluating associations between multiple specific aspects of EF (e.g., working memory, inhibition, and planning and organization) as rated by both parents and teachers on the Behavior Rating Inventory of Executive Function (BRIEF), with multiple academic outcomes, including school grades and homework problems. Further, this study examined the relationship between EF and academic outcomes above and beyond ADHD symptoms and controlled for a number of potentially important covariates, including intelligence and achievement scores. The EF Planning and Organization subscale as rated by both parents and teachers predicted school grades above and beyond symptoms of ADHD and relevant covariates. Parent ratings of youth’s ability to transition effectively between tasks/situations (Shift subscale) also predicted school grades. Parent-rated symptoms of inattention, hyperactivity/impulsivity, and planning and organization abilities were significant in the final model predicting homework problems. In contrast, only symptoms of inattention and the Organization of Materials subscale from the BRIEF were significant in the teacher model predicting homework problems. Organization and planning abilities are highly important aspects academic functioning for middle-school-aged youth with ADHD. Implications of these findings for the measurement of EF, and organization and planning abilities in particular, are discussed along with potential implications for intervention. PMID:23640285

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The High Ranking Facilities Deactivation Project (HRFDP), commissioned by the US Department of Energy Nuclear Materials and Facility Stabilization Program, is to place four primary high-risk surplus facilities with 28 associated ancillary facilities at Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition as rapidly and economically as possible. The facilities will be deactivated and left in a condition suitable for an extended period of minimized surveillance and maintenance (S and M) prior to decontaminating and decommissioning (D and D). These four facilities include two reactor facilities containing spent fuel. One of these reactor facilities also containsmore » 55 tons of sodium with approximately 34 tons containing activated sodium-22, 2.5 tons of lithium hydride, approximately 100 tons of potentially contaminated lead, and several other hazardous materials as well as bulk quantities of contaminated scrap metals. The other two facilities to be transferred include a facility with a bank of hot cells containing high levels of transferable contamination and also a facility containing significant quantities of uranyl nitrate and quantities of transferable contamination. This work plan documents the objectives, technical requirements, and detailed work plans--including preliminary schedules, milestones, and conceptual FY 1996 cost estimates--for the Oak Ridge National Laboratory (ORNL). This plan has been developed by the Environmental Restoration (ER) Program of Lockheed Martin Energy Systems (Energy Systems) for the US Department of Energy (DOE) Oak Ridge Operations Office (ORO).« less

  13. Accelerating the Whiteshell Laboratories Decommissioning Through the Implementation of a Projectized and Delivery-Focused Organization - 13074

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilcox, Brian; Mellor, Russ; Michaluk, Craig

    2013-07-01

    Whiteshell Laboratories (WL) is a nuclear research site in Canada that was commissioned in 1964 by Atomic Energy of Canada Limited. It covers a total area of approximately 4,375 hectares (10,800 acres) and includes the main campus site, the Waste Management Area (WMA) and outer areas of land identified as not used for or impacted by nuclear development or operations. The WL site employed up to 1100 staff. Site activities included the successful operation of a 60 MW organic liquid-cooled research reactor from 1965 to 1985, and various research programs including reactor safety research, small reactor development, fuel development, biophysicsmore » and radiation applications, as well as work under the Canadian Nuclear Fuel Waste Management Program. In 1997, AECL made a business decision to discontinue research programs and operations at WL, and obtained government concurrence in 1998. The Nuclear Legacy Liabilities Program (NLLP) was established in 2006 by the Canadian Government to remediate nuclear legacy liabilities in a safe and cost effective manner, including the WL site. The NLLP is being implemented by AECL under the governance of a Natural Resources Canada (NRCan)/AECL Joint Oversight Committee (JOC). Significant progress has since been made, and the WL site currently holds the only Canadian Nuclear Safety Commission (CNSC) nuclear research site decommissioning license in Canada. The current decommissioning license is in place until the end of 2018. The present schedule planned for main campus decommissioning is 30 years (to 2037), followed by institutional control of the WMA until a National plan is implemented for the long-term management of nuclear waste. There is an impetus to advance work and complete decommissioning sooner. To accomplish this, AECL has added significant resources, reorganized and moved to a projectized environment. This presentation outlines changes made to the organization, the tools implemented to foster projectization, and the benefits and positive impacts on schedule and delivery. A revised organizational structure was implemented in two phases, starting 2011 April 1, to align WL staff with the common goal of decommissioning the site through the direction of the WL Decommissioning Project General Manager. On 2011 September 1, the second phase of the reorganization was implemented and WL Decommissioning staff was organized under five Divisions: Programs and Regulatory Compliance, General Site Services, Decommissioning Strategic Planning, Nuclear Facilities and Project Delivery. A new Mission, Vision and Objectives were developed for the project, and several productivity enhancements are being implemented. These include the use of an integrated and fully re-sourced Site Wide Schedule that is updated and reviewed at Plan-of-the-Week meetings, improved work distribution throughout the year, eliminating scheduling 'push' mentality, project scoreboards, work planning implementation, lean practices and various process improvement initiatives. A revised Strategic Plan is under development that reflects the improved project delivery capabilities. As a result of these initiatives, and a culture change towards a projectized approach, the decommissioning schedule will be advanced by approximately 10 years. (authors)« less

  14. Enhancing infrastructure resilience through business continuity planning.

    PubMed

    Fisher, Ronald; Norman, Michael; Klett, Mary

    2017-01-01

    Critical infrastructure is crucial to the functionality and wellbeing of the world around us. It is a complex network that works together to create an efficient society. The core components of critical infrastructure are dependent on one another to function at their full potential. Organisations face unprecedented environmental risks such as increased reliance on information technology and telecommunications, increased infrastructure interdependencies and globalisation. Successful organisations should integrate the components of cyber-physical and infrastructure interdependencies into a holistic risk framework. Physical security plans, cyber security plans and business continuity plans can help mitigate environmental risks. Cyber security plans are becoming the most crucial to have, yet are the least commonly found in organisations. As the reliance on cyber continues to grow, it is imperative that organisations update their business continuity and emergency preparedness activities to include this.

  15. Remedial investigation concept plan for the groundwater operable units at the chemical plant area and the ordnance works area, Weldon Spring, Missouri

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1999-07-15

    The U.S. Department of Energy (DOE) and the U.S. Department of the Army (DA) are conducting cleanup activities at two properties--the DOE chemical plant area and the DA ordnance works area (the latter includes the training area)--located in the Weldon Spring area in St. Charles County, Missouri. These areas are on the National Priorities List (NPL), and cleanup activities at both areas are conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. DOE and DA are conducting a joint remedial investigation (RI) and baseline risk assessment (BRA) as part of the remedial investigation/feasibility studymore » (RI/FS) for the groundwater operable units for the two areas. This joint effort will optimize further data collection and interpretation efforts and facilitate overall remedial decision making since the aquifer of concern is common to both areas. A Work Plan issued jointly in 1995 by DOE and the DA discusses the results of investigations completed at the time of preparation of the report. The investigations were necessary to provide an understanding of the groundwater system beneath the chemical plant area and the ordnance works area. The Work Plan also identifies additional data requirements for verification of the evaluation presented.« less

  16. Interference due to shared features between action plans is influenced by working memory span.

    PubMed

    Fournier, Lisa R; Behmer, Lawrence P; Stubblefield, Alexandra M

    2014-12-01

    In this study, we examined the interactions between the action plans that we hold in memory and the actions that we carry out, asking whether the interference due to shared features between action plans is due to selection demands imposed on working memory. Individuals with low and high working memory spans learned arbitrary motor actions in response to two different visual events (A and B), presented in a serial order. They planned a response to the first event (A) and while maintaining this action plan in memory they then executed a speeded response to the second event (B). Afterward, they executed the action plan for the first event (A) maintained in memory. Speeded responses to the second event (B) were delayed when it shared an action feature (feature overlap) with the first event (A), relative to when it did not (no feature overlap). The size of the feature-overlap delay was greater for low-span than for high-span participants. This indicates that interference due to overlapping action plans is greater when fewer working memory resources are available, suggesting that this interference is due to selection demands imposed on working memory. Thus, working memory plays an important role in managing current and upcoming action plans, at least for newly learned tasks. Also, managing multiple action plans is compromised in individuals who have low versus high working memory spans.

  17. 48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and..., safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... safety and health standards applicable to the work conditions of contractor and subcontractor employees...

  18. 48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and..., safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... safety and health standards applicable to the work conditions of contractor and subcontractor employees...

  19. 48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and..., safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... safety and health standards applicable to the work conditions of contractor and subcontractor employees...

  20. 48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and..., safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... safety and health standards applicable to the work conditions of contractor and subcontractor employees...

  1. 20 CFR 411.450 - What is an Individual Work Plan?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 2 2011-04-01 2011-04-01 false What is an Individual Work Plan? 411.450 Section 411.450 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE TICKET TO WORK AND SELF-SUFFICIENCY... work plan (IWP) is a required written document signed by an employment network (EN) (other than a State...

  2. 20 CFR 411.450 - What is an Individual Work Plan?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false What is an Individual Work Plan? 411.450 Section 411.450 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE TICKET TO WORK AND SELF-SUFFICIENCY... work plan (IWP) is a required written document signed by an employment network (EN) (other than a State...

  3. The space shuttle payload planning working groups. Volume 10: Space technology

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The findings and recommendations of the Space Technology group of the space shuttle payload planning activity are presented. The elements of the space technology program are: (1) long duration exposure facility, (2) advanced technology laboratory, (3) physics and chemistry laboratory, (4) contamination experiments, and (5) laser information/data transmission technology. The space technology mission model is presented in tabular form. The proposed experiments to be conducted by each test facility are described. Recommended approaches for user community interfacing are included.

  4. MODIS calibration

    NASA Technical Reports Server (NTRS)

    Barker, John L.

    1992-01-01

    The MODIS/MCST (MODIS Characterization Support Team) Status Report contains an outline of the calibration strategy, handbook, and plan. It also contains an outline of the MODIS/MCST action item from the 4th EOS Cal/Val Meeting, for which the objective was to locate potential MODIS calibration targets on the Earth's surface that are radiometrically homogeneous on a scale of 3 by 3 Km. As appendices, draft copies of the handbook table of contents, calibration plan table of contents, and detailed agenda for MODIS calibration working group are included.

  5. Defense Cybersecurity: Opportunities Exist for DOD to Share Cybersecurity Resources with Small Businesses

    DTIC Science & Technology

    2015-09-01

    risk self- Communications identified by small businesses . The guidance Commission includes links to addit ional cybersecurity resources...Working Group 4: Final Report. The report’s appendix provides cybersecurity risk management and best practice recommendations for small and medium...including small businesses . Cybersecurity education for risk assessment and planning. These programs provide education and training that small

  6. Monte Carlo treatment planning with modulated electron radiotherapy: framework development and application

    NASA Astrophysics Data System (ADS)

    Alexander, Andrew William

    Within the field of medical physics, Monte Carlo radiation transport simulations are considered to be the most accurate method for the determination of dose distributions in patients. The McGill Monte Carlo treatment planning system (MMCTP), provides a flexible software environment to integrate Monte Carlo simulations with current and new treatment modalities. A developing treatment modality called energy and intensity modulated electron radiotherapy (MERT) is a promising modality, which has the fundamental capabilities to enhance the dosimetry of superficial targets. An objective of this work is to advance the research and development of MERT with the end goal of clinical use. To this end, we present the MMCTP system with an integrated toolkit for MERT planning and delivery of MERT fields. Delivery is achieved using an automated "few leaf electron collimator" (FLEC) and a controller. Aside from the MERT planning toolkit, the MMCTP system required numerous add-ons to perform the complex task of large-scale autonomous Monte Carlo simulations. The first was a DICOM import filter, followed by the implementation of DOSXYZnrc as a dose calculation engine and by logic methods for submitting and updating the status of Monte Carlo simulations. Within this work we validated the MMCTP system with a head and neck Monte Carlo recalculation study performed by a medical dosimetrist. The impact of MMCTP lies in the fact that it allows for systematic and platform independent large-scale Monte Carlo dose calculations for different treatment sites and treatment modalities. In addition to the MERT planning tools, various optimization algorithms were created external to MMCTP. The algorithms produced MERT treatment plans based on dose volume constraints that employ Monte Carlo pre-generated patient-specific kernels. The Monte Carlo kernels are generated from patient-specific Monte Carlo dose distributions within MMCTP. The structure of the MERT planning toolkit software and optimization algorithms are demonstrated. We investigated the clinical significance of MERT on spinal irradiation, breast boost irradiation, and a head and neck sarcoma cancer site using several parameters to analyze the treatment plans. Finally, we investigated the idea of mixed beam photon and electron treatment planning. Photon optimization treatment planning tools were included within the MERT planning toolkit for the purpose of mixed beam optimization. In conclusion, this thesis work has resulted in the development of an advanced framework for photon and electron Monte Carlo treatment planning studies and the development of an inverse planning system for photon, electron or mixed beam radiotherapy (MBRT). The justification and validation of this work is found within the results of the planning studies, which have demonstrated dosimetric advantages to using MERT or MBRT in comparison to clinical treatment alternatives.

  7. The meaning of work in people with severe mental illness (SMI) in Iran.

    PubMed

    Khalaf Beigi, Mitra; Mohammadi Shahbolaghi, Farahnaz; Rassafiani, Mehdi; Haghgoo, Hojjat-Allah; Taherkhani, Hamid

    2015-01-01

    Work is the key component for most people in regard to financial, social and wellbeing matters. Employment is an important factor underpinning mental health disorders. However, unemployment remains an unsolved issue worldwide. Numerous studies have focused on employment outcomes in people with severe mental illness (SMI) but, only a few have explored their perspective on employment. Therefore, this study aimed to clarify the meaning of work among clients with SMI in Iran. A qualitative research approach was used to conduct this research. Ten participants who were consumers of mental health services took part in this study. Data were analyzed by inductive content analysis approach. Four themes emerged from data including: acquiring identity, work as a drive, passing the time and financial independence. Meaning of work in studied people with SMI was probably similar to the general population. The different finding in this study refers to the dominancy of family relationships and spiritual believes which could cover some problems and in turn affect the meaning of work. Highlighting these meanings could direct mental health professionals to better planning for their clients have better understanding of their clients' work future and in turn provide more precise plan for them.

  8. Review of the transportation planning process in the Denver metropolitan area

    DOT National Transportation Integrated Search

    2012-11-01

    Harmonization Task Groups 1 and 3 (HTG1 and 3) were established by the EU-US International Standards Harmonization Working Group to attempt to harmonize standards (including ISO, CEN, ETSI, IEEE) on security (HTG1) and communications protocols (HTG3)...

  9. Special Issue: Competencies from the Individual's Viewpoint.

    ERIC Educational Resources Information Center

    Career Planning and Adult Development Journal, 2003

    2003-01-01

    Ten articles in this special issue deal with competencies and how their use is revolutionizing human resource management and the work of career practitioners. Topics include competency technology, models, and mapping; behavioral interviewing; talent management; emotional intelligence; succession planning; and lifelong learning. (JOW)

  10. 40 CFR 35.603 - Competitive process.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... STATE AND LOCAL ASSISTANCE Environmental Program Grants for Tribes Water Quality Cooperative Agreements (section 104(b)(3)) § 35.603 Competitive process. EPA will award water quality cooperative agreement funds... a Performance Partnership Grant, the water quality work plan commitments must be included in the...

  11. 48 CFR 252.215-7002 - Cost estimating system requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... customers in the expectation of receiving contract awards. Estimating system includes the Contractor's— (1... and managerial reviews; (4) Flow of work, coordination, and communication; and (5) Budgeting, planning... writing, its rationale for disagreeing. (3) The Contracting Officer will evaluate the Contractor's...

  12. 48 CFR 252.215-7002 - Cost estimating system requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... customers in the expectation of receiving contract awards. Estimating system includes the Contractor's— (1... and managerial reviews; (4) Flow of work, coordination, and communication; and (5) Budgeting, planning... writing, its rationale for disagreeing. (3) The Contracting Officer will evaluate the Contractor's...

  13. ACHP | Federal Programs that Can Support Heritage Tourism

    Science.gov Websites

    farmers and ranchers in exploring alternate economic enterprises, including heritage tourism.(http Rural Business Enterprise Grants, Rural Business Opportunity Grants, and Rural Economic Development /td/mdcp/) Public Works, Economic Adjustment, Planning, and Research and Technical Assistance Programs

  14. Research Program Office of Statewide Planning and Research : State Fiscal Year 2011 Annual Report

    DOT National Transportation Integrated Search

    2011-01-01

    This annual report is designed to share program activities and results for Ohio Department of : Transportations research program. In addition to work on the projects shown in the body of : the report, 2011 accomplishments include: increasing engag...

  15. Tests of Lorentz and CPT Invariance in Space

    NASA Technical Reports Server (NTRS)

    Mewes, Matthew

    2003-01-01

    I give a brief overview of recent work concerning possible signals of Lorentz violation in sensitive clock-based experiments in space. The systems under consideration include atomic clocks and electromagnetic resonators of the type planned for flight on the International Space Station.

  16. 7 CFR 1710.252 - Construction work plans-power supply borrowers.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... operating systems of supporting power pools and to connect with adjacent power suppliers; (4) Improvements..., new substations and substation improvements and replacements, and Systems Control and Data Acquisition... include studies of load flows, voltage regulation, and stability characteristics to demonstrate system...

  17. 7 CFR 1710.252 - Construction work plans-power supply borrowers.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... operating systems of supporting power pools and to connect with adjacent power suppliers; (4) Improvements..., new substations and substation improvements and replacements, and Systems Control and Data Acquisition... include studies of load flows, voltage regulation, and stability characteristics to demonstrate system...

  18. 7 CFR 1710.252 - Construction work plans-power supply borrowers.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... operating systems of supporting power pools and to connect with adjacent power suppliers; (4) Improvements..., new substations and substation improvements and replacements, and Systems Control and Data Acquisition... include studies of load flows, voltage regulation, and stability characteristics to demonstrate system...

  19. 7 CFR 1710.252 - Construction work plans-power supply borrowers.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... operating systems of supporting power pools and to connect with adjacent power suppliers; (4) Improvements..., new substations and substation improvements and replacements, and Systems Control and Data Acquisition... include studies of load flows, voltage regulation, and stability characteristics to demonstrate system...

  20. 7 CFR 1710.252 - Construction work plans-power supply borrowers.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... operating systems of supporting power pools and to connect with adjacent power suppliers; (4) Improvements..., new substations and substation improvements and replacements, and Systems Control and Data Acquisition... include studies of load flows, voltage regulation, and stability characteristics to demonstrate system...

  1. Review of the transportation planning process in the Pittsburgh metropolitan area

    DOT National Transportation Integrated Search

    2012-11-12

    Harmonization Task Groups 1 and 3 (HTG1 and 3) were established by the EU-US International Standards Harmonization Working Group to attempt to harmonize standards (including ISO, CEN, ETSI, IEEE) on security (HTG1) and communications protocols (HTG3)...

  2. Technology Dollars from Pennies Saved.

    ERIC Educational Resources Information Center

    Anderson, Mary Alice

    1996-01-01

    Suggests ways to stretch media center budgets for technology, based on experiences at Winona Middle School (Minnesota). Topics include keeping statistics, hardware purchase and warranty information, centralizing purchases, planning for the reallocation of hardware and software, creative financing, working with business and community groups, staff…

  3. Defense Advanced Research Projects Agency: Strategic Plan

    DTIC Science & Technology

    2009-05-01

    technologies to detect, prevent, or mitigate asymmetric attacks, including suicide bombers, improvised explosive devices, and weapons of mass destruction...the Army’s Command Post of the Future (CPOF) to amplify the capabilities of overworked combat command and control staffs. Working with CPOF, PAL

  4. 40 CFR 35.603 - Competitive process.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... a Performance Partnership Grant, the water quality work plan commitments must be included in the... STATE AND LOCAL ASSISTANCE Environmental Program Grants for Tribes Water Quality Cooperative Agreements (section 104(b)(3)) § 35.603 Competitive process. EPA will award water quality cooperative agreement funds...

  5. 40 CFR 35.603 - Competitive process.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... a Performance Partnership Grant, the water quality work plan commitments must be included in the... STATE AND LOCAL ASSISTANCE Environmental Program Grants for Tribes Water Quality Cooperative Agreements (section 104(b)(3)) § 35.603 Competitive process. EPA will award water quality cooperative agreement funds...

  6. 40 CFR 35.603 - Competitive process.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... a Performance Partnership Grant, the water quality work plan commitments must be included in the... STATE AND LOCAL ASSISTANCE Environmental Program Grants for Tribes Water Quality Cooperative Agreements (section 104(b)(3)) § 35.603 Competitive process. EPA will award water quality cooperative agreement funds...

  7. 40 CFR 35.603 - Competitive process.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... a Performance Partnership Grant, the water quality work plan commitments must be included in the... STATE AND LOCAL ASSISTANCE Environmental Program Grants for Tribes Water Quality Cooperative Agreements (section 104(b)(3)) § 35.603 Competitive process. EPA will award water quality cooperative agreement funds...

  8. Toward an Evaluation Framework for Doctoral Education in Social Work: A 10-Year Retrospective of One PhD Program's Assessment Experiences

    ERIC Educational Resources Information Center

    Bentley, Kia J.

    2013-01-01

    This article presents a framework for evaluation in social work doctoral education and details 10 years of successes and challenges in one PhD program's use of the framework, including planning and implementing specific assessment activities around student learning outcomes and larger program goals. The article argues that a range of…

  9. [On risk-oriented model of sanitary epidemiologic surveillance in occupational hygiene].

    PubMed

    Zaitseval, N V; Mai, I V; Kostarev, V G; Bashketova, N S

    2015-01-01

    In 2015, Federal Service on surveillance in consumers rights protection and public well-being set a task to organize planned work of regional agencies on basis of risk-oriented model of control and supervision. Based on results of pilot project in Rospotrebnadzor Department of Perm area and St-Petersburg, the article covers methodic approaches to classification of objects liable to surveillance in occupational hygiene. The classification considers possibility of sanitary law violation, severity of this violation consequences and number of workers exposed to risk factors including hazardous work conditions. The authors specified recommendations on periodicity and forms of planned inspections considering evaluation of potential risk for human health, determined problems that require solution in implementation of risk-oriented model of surveillance.

  10. Delegation in Correctional Nursing Practice.

    PubMed

    Tompkins, Frances

    2016-07-01

    Correctional nurses face daily challenges as a result of their work environment. Common challenges include availability of resources for appropriate care delivery, negotiating with custody staff for access to patients, adherence to scope of practice standards, and working with a varied staffing mix. Professional correctional nurses must consider the educational backgrounds and competency of other nurses and assistive personnel in planning for care delivery. Budgetary constraints and varied staff preparation can be a challenge for the professional nurse. Adequate care planning requires understanding the educational level and competency of licensed and unlicensed staff. Delegation is the process of assessing patient needs and transferring responsibility for care to appropriately educated and competent staff. Correctional nurses can benefit from increased knowledge about delegation. © The Author(s) 2016.

  11. Violence prevention at work. A business perspective.

    PubMed

    Wilkinson, C W

    2001-02-01

    The risk of workplace violence varies depending on the type and location of the business. Business managers should assess violence risk and develop a program based on the level of risk faced by their employees. This assessment should include: (1) a review of workplace security and identification of positions with increased risk of exposure to violence, (2) risk reduction through environmental design and employee training, (3) development of a plan and identification of professional resources to respond to incidents should they occur, and (4) communication of the employer's commitment to providing a safe work environment for employees. For most businesses, threat assessment and management comprise the cornerstone of a workplace violence-prevention program. Planning and preparation are key to workplace violence prevention.

  12. A tool for enhancing strategic health planning: a modeled use of the International Classification of Functioning, Disability and Health

    PubMed Central

    Sinclair, Lisa Bundara; Fox, Michael H.; Betts, Donald R.

    2015-01-01

    SUMMARY This article describes use of the International Classification of Functioning, Disability and Health (ICF) as a tool for strategic planning. The ICF is the international classification system for factors that influence health, including Body Structures, Body Functions, Activities and Participation and Environmental Factors. An overview of strategic planning and the ICF are provided. Selected ICF concepts and nomenclature are used to demonstrate its utility in helping develop a classic planning framework, objectives, measures and actions. Some issues and resolutions for applying the ICF are described. Applying the ICF for strategic health planning is an innovative approach that fosters the inclusion of social ecological health determinants and broad populations. If employed from the onset of planning, the ICF can help public health organizations systematically conceptualize, organize and communicate a strategic health plan. This article is a US Government work and is in the public domain in the USA. PMID:23147247

  13. A tool for enhancing strategic health planning: a modeled use of the International Classification of Functioning, Disability and Health.

    PubMed

    Sinclair, Lisa Bundara; Fox, Michael H; Betts, Donald R

    2013-01-01

    This article describes use of the International Classification of Functioning, Disability and Health (ICF) as a tool for strategic planning. The ICF is the international classification system for factors that influence health, including Body Structures, Body Functions, Activities and Participation and Environmental Factors. An overview of strategic planning and the ICF are provided. Selected ICF concepts and nomenclature are used to demonstrate its utility in helping develop a classic planning framework, objectives, measures and actions. Some issues and resolutions for applying the ICF are described. Applying the ICF for strategic health planning is an innovative approach that fosters the inclusion of social ecological health determinants and broad populations. If employed from the onset of planning, the ICF can help public health organizations systematically conceptualize, organize and communicate a strategic health plan. Published 2012. This article is a US Government work and is in the public domain in the USA.

  14. Creating a Lunar EVA Work Envelope

    NASA Technical Reports Server (NTRS)

    Griffin, Brand N.; Howard, Robert; Rajulu, Sudhakar; Smitherman, David

    2009-01-01

    A work envelope has been defined for weightless Extravehicular Activity (EVA) based on the Space Shuttle Extravehicular Mobility Unit (EMU), but there is no equivalent for planetary operations. The weightless work envelope is essential for planning all EVA tasks because it determines the location of removable parts, making sure they are within reach and visibility of the suited crew member. In addition, using the envelope positions the structural hard points for foot restraints that allow placing both hands on the job and provides a load path for reacting forces. EVA operations are always constrained by time. Tasks are carefully planned to ensure the crew has enough breathing oxygen, cooling water, and battery power. Planning first involves computers using a virtual work envelope to model tasks, next suited crew members in a simulated environment refine the tasks. For weightless operations, this process is well developed, but planetary EVA is different and no work envelope has been defined. The primary difference between weightless and planetary work envelopes is gravity. It influences anthropometry, horizontal and vertical mobility, and reaction load paths and introduces effort into doing "overhead" work. Additionally, the use of spacesuits other than the EMU, and their impacts on range of motion, must be taken into account. This paper presents the analysis leading to a concept for a planetary EVA work envelope with emphasis on lunar operations. There is some urgency in creating this concept because NASA has begun building and testing development hardware for the lunar surface, including rovers, habitats and cargo off-loading equipment. Just as with microgravity operations, a lunar EVA work envelope is needed to guide designers in the formative stages of the program with the objective of avoiding difficult and costly rework.

  15. The " Swarm of Ants vs. Herd of Elephants" Debated Revisited: Performance Measurements of PVM-Overflow Across a Wide Spectrum of Architectures

    NASA Technical Reports Server (NTRS)

    Yan, Jerry C.; Jespersen, Dennis; Buning, Peter; Bailey, David (Technical Monitor)

    1996-01-01

    The Gorden Bell Prizes given out at Supercomputing every year includes at least two catergories: performance (highest GFLOP count) and price-performance (GFLOP/million $$) for real applications. In the past five years, the winners of the price-performance categories all came from networks of work-stations. This reflects three important facts: 1. supercomputers are still too expensive for the masses; 2. achieving high performance for real applications takes real work; and, most importantly; 3. it is possible to obtain acceptable performance for certain real applications on network of work stations. With the continued advance of network technology as well as increased performance of "desktop" workstation, the "Swarm of Ants vs. Herd of Elephants" debate, which began with vector multiprocessors (VPPs) against SIMD type multiprocessors (e.g. CM2), is now recast as VPPs against Symetric Multiprocessors (SMPs, e.g. SGI PowerChallenge). This paper reports on performance studies we performed solving a large scale (2-million grid pt.s) CFD problem involving a Boeing 747 based on a parallel version of OVERFLOW that utilizes message passing on PVM. A performance monitoring tool developed under NASA HPCC, called AIMS, was used to instrument and analyze the the performance data thus obtained. We plan to compare its performance data obtained across a wide spectrum of architectures including: the Cray C90, IBM/SP2, SGI/Power Challenge Cluster, to a group of workstations connected over a simple network. The metrics of comparison includes speed-up, price-performance, throughput, and turn-around time. We also plan to present a plan of attack for various issues that will make the execution of Grand Challenge Applications across the Global Information Infrastructure a reality.

  16. Fossil Energy Planning for Navajo Nation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Acedo, Margarita

    This project includes fossil energy transition planning to find optimal solutions that benefit the Navajo Nation and stakeholders. The majority of the tribe’s budget currently comes from fossil energy-revenue. The purpose of this work is to assess potential alternative energy resources including solar photovoltaics and biomass (microalgae for either biofuel or food consumption). This includes evaluating carbon-based reserves related to the tribe’s resources including CO 2 emissions for the Four Corners generating station. The methodology for this analysis will consist of data collection from publicly available data, utilizing expertise from national laboratories and academics, and evaluating economic, health, and environmentalmore » impacts. Finally, this report will highlight areas of opportunities to implement renewable energy in the Navajo Nation by presenting the technology requirements, cost, and considerations to energy, water, and environment in an educational structure.« less

  17. Comments on "Women, Development Planning and Government Policies in Pakistan".

    PubMed

    Hafeez, S

    1992-01-01

    Commentary on Shahnaz and Bilquees Raza's paper on women in development in Pakistan is supportive of the content analysis of the Sixth and Seventh 5-Year Plans and policies, but critical of the methods used n the analysis. The parallel to survey research methods was made in that there was a specification of 1) the unit of analysis (reference to each policy measure, each chapter, each page of the plan), 2) the rationale for the plan, 3) specific objectives of the examination, and 4) the criteria for analysis. Missing also was the identification of policy trends from the Fourth and Fifth 5-Year Plans. The question is never answered as to why gender issues were not directed to the agricultural sector. The conclusion that there was a hugh gap between intentions and implementation was an issue not unique to women's issues, and a deeper analysis may have been required in order to understand the nature and magnitude of the gaps for women's policies and their productive roles. Questions should have been directed to the issues of the root causes of gaps in planning and implementation of policies and programs for women in development, and the identification of quantitative and qualitative indicators of gaps. Questions arise as to whether the gaps have changed with changes in the strength of political and social will in various decades. Recognition was given by the authors to the low budget allocations between 1955 and 1970 to education and health which affected both men and women, but there was scant mention of the strong social, not political, will to enhance women's welfare prevalent at this time. Information was lacking on the differences between the Sixth and Seventh sectoral plans for agricultural employment and women and the working groups plans that did include women in agricultural employment; the question is why the working plans were not incorporated into the final plans, and why the working groups did not protest this omission. The lack of political and social will was one of the most significant gaps between policy and implementation that was the article's focus. Has the Ministry of Women in Development really been given administrative authority to promote social change?

  18. Request for Correction 15003 - Information Quality Act request for Correction of the TSCA Work Plan

    EPA Pesticide Factsheets

    This RFC concerns the Information Quality Act request for correction of the TSCA Work Plan for Chemical Assessments: 20154 Update and the TSCA Work Plan Chemicals: Methods Document (February 2012) regarding assessment of phthalic anhydride

  19. Social Work Education Planning & Assessment System: Handbook of Fundamental Assessment Concepts; Manual for Project Managers; Appendices.

    ERIC Educational Resources Information Center

    Social and Rehabilitation Service (DHEW), Washington, DC.

    The Social Work Education Planning and Assessment (SWEPA) System is an information system designed to function within social work education toward two main purposes: (1) to help schools more effectively specify their own educational objectives, plan their social work education projects to achieve these objectives, mark their progress toward this…

  20. Analysis of The Planning Education in the Light of the Contemporary Trends in Planning

    NASA Astrophysics Data System (ADS)

    Husar, Milan; Ceren Varis, Sila; Ondrejicka, Vladimir

    2017-12-01

    This paper examines the way the planning education is taught and examines the recent trends in the curricula of planning education institutions. The introduction of changing economic systems and planning in the field of education is discussed against these changes. Additionally, the evolution in the planner’s role and how it affects the planning education is discussed. The paper is addressing trends and challenges the countries and their planning changes are facing in 21st century. The trends such as increasing globalization, fuzziness of spatial structures and their borders, complexity and uncertainty and the growing interconnectedness of the world are discussed. Another aim is to prepare a common ground, a platform at the university level for scientific cooperation in the field of planning. This study aims at examining the situation of planning in the contemporary world. The identified challenges include the need for more flexibility in planning and planning education, the emergence of innovations and creativity in planners and planning projects, the necessity of promoting soft skills while keeping the existing technical nature of planning and lastly, the need for more interdisciplinary work. The final part of the paper is discussing the future planning education and recommendations on how the schools of planning should reflect these changes.

Top