Sample records for work plan outlines

  1. 7 CFR 1710.209 - Approval requirements for load forecast work plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... cooperate in the preparation of and submittal of the load forecast work plan of their power supply borrower. (b) An approved load forecast work plan establishes the process for the preparation and maintenance... approved load forecast work plan must outline the coordination and preparation requirements for both the...

  2. Work-Plan Heroes: Student Strategies in Lower-Secondary Norwegian Classrooms

    ERIC Educational Resources Information Center

    Dalland, Cecilie P.; Klette, Kirsti

    2014-01-01

    This article explores how individualized teaching methods, such as the use of work plans, create new student strategies in Norwegian lower secondary classrooms. Work plans, which are frequently set up as instructional tools in Norwegian classrooms, outline different types of tasks and requirements that the students are supposed to do during a…

  3. Interim OECA Guidance on Enhancing Regional-State Planning and Communication on Compliance Assurance Work in Authorized States

    EPA Pesticide Factsheets

    Guidance outlining principles and best practices for State and EPA collaboration in inspections and enforcement. work planning and implementation. National Enforcement Initiatives, and outcome and performance measurement.

  4. Metalworking Lathe; Machine Shop Work--Intermediate: 9555.03.

    ERIC Educational Resources Information Center

    Dade County Public Schools, Miami, FL.

    The course outline has been prepared as a guide to assist the instructor to plan systematically and to present meaningful lessons to provide the training needed by the machine shop student. This is the third course of instruction in a series of machine shop work courses. The six blocks of instruction contained in this outline are designed to…

  5. Bench Work and Support Operations, Machine Shop Work--Intermediate: 9555.02.

    ERIC Educational Resources Information Center

    Dade County Public Schools, Miami, FL.

    The course outline has been prepared as a guide to assist the instructor to plan systematically and to present meaningful lessons programmed to meet the necessary training needed by the machine shop student who has completed an introductory course in machine tool technology. The five blocks of instruction contained in this outline are designed to…

  6. Contingency Planning for Planetary Rovers

    NASA Technical Reports Server (NTRS)

    Dearden, Richard; Meuleau, Nicolas; Ramakrishnan, Sailesh; Smith, David; Washington, Rich; Clancy, Daniel (Technical Monitor)

    2002-01-01

    There has been considerable work in AI on planning under uncertainty. But this work generally assumes an extremely simple model of action that does not consider continuous time and resources. These assumptions are not reasonable for a Mars rover, which must cope with uncertainty about the duration of tasks, the power required, the data storage necessary, along with its position and orientation. In this paper, we outline an approach to generating contingency plans when the sources of uncertainty involve continuous quantities such as time and resources. The approach involves first constructing a "seed" plan, and then incrementally adding contingent branches to this plan in order to improve utility. The challenge is to figure out the best places to insert contingency branches. This requires an estimate of how much utility could be gained by building a contingent branch at any given place in the seed plan. Computing this utility exactly is intractable, but we outline an approximation method that back propagates utility distributions through a graph structure similar to that of a plan graph.

  7. Incremental Contingency Planning

    NASA Technical Reports Server (NTRS)

    Dearden, Richard; Meuleau, Nicolas; Ramakrishnan, Sailesh; Smith, David E.; Washington, Rich

    2003-01-01

    There has been considerable work in AI on planning under uncertainty. However, this work generally assumes an extremely simple model of action that does not consider continuous time and resources. These assumptions are not reasonable for a Mars rover, which must cope with uncertainty about the duration of tasks, the energy required, the data storage necessary, and its current position and orientation. In this paper, we outline an approach to generating contingency plans when the sources of uncertainty involve continuous quantities such as time and resources. The approach involves first constructing a "seed" plan, and then incrementally adding contingent branches to this plan in order to improve utility. The challenge is to figure out the best places to insert contingency branches. This requires an estimate of how much utility could be gained by building a contingent branch at any given place in the seed plan. Computing this utility exactly is intractable, but we outline an approximation method that back propagates utility distributions through a graph structure similar to that of a plan graph.

  8. Investigation into avian mortality in the Playa Lakes region of southeastern New Mexico: Final Report - June 1997

    USGS Publications Warehouse

    Dein, F. Joshua; Baeten, Laurie A.; Moore, Melody K.; Samuel, Michael D.; Miller, Paul D.; Murphy, Christopher; Sissler, Steven; Jeske, Clinton W.; Jehl, Joseph R.; Yaeger, J. S.; Bauer, B.; Mahoney, Shiela A.

    1997-01-01

    This Final Report is a review of work on a cooperative study undertaken by the USGS Biological Resources Division's National Wildlife Health Center (NWHC) and National Wetlands Research Center (NWRC; formerly the Southern Science Center) from 1994 through 1997. The study was initiated at the request of the Bureau of Land Management (BLM), through a request to the former National Biological Service. The Southeastern New Mexico Playa Lakes Coordinating Committee (SENMPLCC) played an important role in outlining the research needs. The initial Study Plan document, which outlines the background, objectives and methods for the first two years is available as Appendix 1. A letter indicating modifications to the Study Plan was sent to the SENMPLCC chair on April 25,1995, and is Appendix 2. An Interim Report, covering this work was completed and submitted in September 1995. The Literature Review section of the study was completed and presented to SENMPLCC in August, 1995. Following SENMPLCC review, NWHC was asked to develop a series of questions that could be posed from information gained in the initial phase (Appendix 3). The NWHC and NWRC were then directed to begin work to answer the top three questions, within the available fiscal resources. NWRC could continue with work outlined under the original Study Plan (Appendix 1), however an additional Study Plan for experiments performed by NWHC and collaborators and is available as Appendix 4.

  9. Sustainable and Healthy Communities Strategic Research Action Plan 2016-2019

    EPA Pesticide Factsheets

    This plan outlines the Office of Research and Development’s role in achieving EPA’s objectives for cleaning up communities, making a visible difference in communities, and working toward a sustainable future.

  10. New Jersey interagency emergency management plan.

    DOT National Transportation Integrated Search

    2005-09-01

    This report outlines the research and work performed to lay the foundation for the : development of a New Jersey Interagency Emergency Management Plan. The : research into existing practices within the four state level transportation agencies : revea...

  11. Peer Review Plan for OPPT Work Plan Risk Assessment of 1 - Bromopropane (“1 - BP”)

    EPA Pesticide Factsheets

    This document outlines the peer review plan for a risk assessment which addresses occupational uses of 1-BP in dry-cleaning and foam gluing operations, consumer uses in aerosol solvent cleaners and spray adhesives, and its effects on human health.

  12. Collaborative Strategic Planning in Higher Education

    ERIC Educational Resources Information Center

    Sanaghan, Patrick

    2009-01-01

    This book outlines a simple, five-phase collaborative approach to strategic planning that has worked effectively on many campuses. Specifically, Collaborative Strategic Planning (CSP) refers to the disciplined and thoughtful process of meaningfully engaging relevant stakeholders in creating a shared future vision and goals for their institution.…

  13. Education for Parenthood.

    ERIC Educational Resources Information Center

    Rutgers, The State Univ., New Brunswick, NJ. Vocational-Technical Curriculum Lab.

    This guide is intended for use in teaching a parenthood education program in which adolescents work with young children while learning about effective parenting. The program's 26 objectives are outlined in the first section of the guide. The second section is a lesson plan containing a content outline with cross-referenced suggested learning…

  14. MODIS calibration

    NASA Technical Reports Server (NTRS)

    Barker, John L.

    1992-01-01

    The MODIS/MCST (MODIS Characterization Support Team) Status Report contains an outline of the calibration strategy, handbook, and plan. It also contains an outline of the MODIS/MCST action item from the 4th EOS Cal/Val Meeting, for which the objective was to locate potential MODIS calibration targets on the Earth's surface that are radiometrically homogeneous on a scale of 3 by 3 Km. As appendices, draft copies of the handbook table of contents, calibration plan table of contents, and detailed agenda for MODIS calibration working group are included.

  15. Abrasives and Grinding Machines; Machine Shop Work--Advanced: 9557.02.

    ERIC Educational Resources Information Center

    Dade County Public Schools, Miami, FL.

    The course outline has been prepared as a guide to assist the instructor in systematically planning and presenting a variety of meaningful lessons to facilitate the necessary training for the machine shop student. The material contained in the outline is designed to enable the student to learn the manipulative skills and related knowledge…

  16. A Vocational/Special Education Individualized Transitional Planner (School to Work).

    ERIC Educational Resources Information Center

    Youshock, Joseph M.; Gilgannon, Nancy

    This individualized transition plan manual can be used by special and vocational educators in developing a curriculum plan for handicapped or special needs learners based on career goals and job selection. The introductory sections provide a description of the individual transition planning model, an outline of communication skills, and a list of…

  17. Introduction to Machine Tool Technology, Machine Shop Work--Intermediate: 9555.01.

    ERIC Educational Resources Information Center

    Dade County Public Schools, Miami, FL.

    The course outline has been prepared as a guide to assist the instructor to plan systematically and to present meaningful lessons programmed to meet the necessary training needed by the machine shop student. A beginning course, the four blocks of instruction contained in the outline are designed to enable the student to obtain the manipulative…

  18. Risk identification and reduction in integrated product teams

    NASA Technical Reports Server (NTRS)

    Batson, Robert G.

    1993-01-01

    This brief report summarizes research and planning conducted during Summer 1993 for MSFC on the subjects of risk identification, assessment, and management. Research findings are presented, citing useful references. The major output of this work, the AXAF-S Project Risk Management Plan is outlined.

  19. Education and Employment Issues. Issue Area Plan for Fiscal Year 1997-99.

    ERIC Educational Resources Information Center

    General Accounting Office, Washington, DC. Health, Education, and Human Services Div.

    This publication outlines the issues in the areas of education and employment that the General Accounting Office plans to investigate and the focus of the planned work for Fiscal Years 1997-99. The principal issues to be investigated are the following: (1) using federal resources to support and encourage state and local efforts to provide…

  20. Federal Student Aid (FSA) Five-Year Strategic Plan. FY 2004-2008

    ERIC Educational Resources Information Center

    US Department of Education, 2004

    2004-01-01

    The FSA Five-Year Strategic Plan is a roadmap for FY 2004-2008 that identifies five long-range strategic objectives, tactical short-term goals, and performance management initiatives. In working toward the goals outlined in the plan, FSA will address a number of key challenges, including legacy system migration, business process re-engineering,…

  1. Course Outline for Lesson Plans for Pre-Employment Laboratory Training in CVAE-VEH Farm and Ranch Mechanical Repair.

    ERIC Educational Resources Information Center

    Texas A and M Univ., College Station. Vocational Instructional Services.

    This packet contains 88 lesson plans for a laboratory course in farm and ranch mechanical repair. The lesson plans are organized into six units covering the following topics: occupational information, construction and maintenance (safety, farm carpentry, farm water supply and sanitation, farm electricity, concrete), hot metal work (oxyacetylene…

  2. Test and Evaluation Master Plan (TEMP) for the Ports and Waterways Safety System (PAWSS) Project

    DOT National Transportation Integrated Search

    1997-01-01

    This document outlines the Test Concept for the Ports and Waterways Safety System (PAWSS) Project. This Test and Evaluation Master Plan (TEMP) purpose is to reduce risk and ensure the PAWSS project meets all System Specification and Statement of Work...

  3. 33 CFR 155.4025 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... another, when the vessel's own transfer equipment is not working. External firefighting teams means... vessel, or damage to the marine environment. Marine firefighting pre-fire plan means a plan that outlines... scene, at a safe distance from the vessel or on the vessel, who can determine the steps needed to...

  4. Guidelines for Implementing a Real Estate Cooperative Education Program.

    ERIC Educational Resources Information Center

    Pearson, Thomas R.

    Background information and guidelines are provided for the development of cooperative education programs for real estate industry personnel. The first section outlines the operation of cooperative education programs and presents two organizational plans: the alternating plan, where students attend class full-time and work full-time during…

  5. Disaster Response and Planning for Libraries.

    ERIC Educational Resources Information Center

    Kahn, Miriam B.

    Providing a customized disaster response plan to assist libraries in quick recovery, this resource also outlines step to minimize damage and protect materials before trouble strikes. The first section of the book, "Response," contains information how to handle small jobs in-house and suggestions for working with contractors--with an…

  6. Agricultural Extension--Programming the Work.

    ERIC Educational Resources Information Center

    Smith, G. A.

    This paper outlines the concept of "program" and one set of elements that are considered to make up the program planning process in agricultural extension, and an example of practical program planning in Rhodesia is given. Although there is a wide variety of meanings attached to the term "program" in adult education, it has…

  7. A New U.S. Carbon Cycle Science Plan

    NASA Astrophysics Data System (ADS)

    Michalak, A. M.; Jackson, R.; Marland, G.; Sabine, C.

    2009-05-01

    The report "A U.S. carbon cycle science plan" (J. L. Sarmiento and S. C. Wofsy, U.S. Global Change Res. Program, Washington, D. C., 1999) outlined research priorities and promoted coordinated carbon cycle research across federal agencies in the United States for nearly a decade. Building on this framework and subsequent reports (http://www.carboncyclescience.gov/docs.php), a working group comprised of 27 scientists was formed in 2008 under the United States Carbon Cycle Science Program to review the 1999 Science Plan, and to develop an updated strategy for carbon cycle research for the period from 2010 to 2020. This comprehensive review is being conducted with wide input from the research and stakeholder communities. The recommendations of the Carbon Cycle Science Working Group (CCSWG) will go to U.S. agency managers who have collective responsibility for setting national carbon cycle science priorities and for sponsoring much of the carbon cycle research in the United States. This presentation will provide an update on the ongoing planning process, will outline the steps that the CCSWG is undertaking in building consensus towards an updated U.S. Carbon Cycle Science Plan, and will seek input on the best ways in which to coordinate efforts with ongoing and upcoming research in Canada and Mexico, as well as with ongoing work globally.

  8. Low Cost Benefit Suggestions.

    ERIC Educational Resources Information Center

    Doyel, Hoyt W.; McMillan, John D.

    1980-01-01

    Outlines eight low-cost employee benefits and summarizes their relative advantages. The eight include a stock ownership program, a sick leave pool, flexible working hours, production incentives, and group purchase plans. (IRT)

  9. Initial Integrated Strategic Sustainability Plan for Fort Leonard Wood

    DTIC Science & Technology

    2012-05-01

    objective of this work was to develop the initial version of a 25-year ISSP incorporating FLW’s mission and vision with its energy, environmen- tal...plans outlining the tasks and resources needed to achieve the objectives; and development of metrics for assessing progress toward each objective... development and redevelopment at Fort Leonard Wood 4.1.1 Description In the next 25 years, transform into an Installation with an efficient net- work

  10. Final Work Plan: Targeted Investigation at York, Nebraska

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, Lorraine M.

    The targeted investigation at York will be implemented in phases, so that data collected and interpretations developed at each stage of the program can be evaluated to guide subsequent phases most effectively. Section 2 of this Work Plan presents a brief overview of the York site, its geologic and hydrologic setting, and the previous CCC/USDA investigations. Section 3, outlines the proposed technical program for the targeted investigation, and Section 4 describes the investigative methods to be employed. A community relations plan is in Section 5, and Section 6 includes health and safety information. In addition to this site-specific Work Plan,more » the Master Work Plan (Argonne 2002) developed by Argonne for CCC/USDA investigations in Nebraska should be consulted for complete details of the methods and procedures to be used at York.« less

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan formore » the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.« less

  12. T & E...We Can Make It Work.

    ERIC Educational Resources Information Center

    NJEA Review, 1978

    1978-01-01

    The New Jersey Education Association outlines a 55 point plan for quality education in New Jersey school districts, in relation to the state's 1975 school improvement law for "Thorough and Efficient Education." (SJL)

  13. 78 FR 5854 - Notification of the First Meetings of the U.S.-Korea FTA Environmental Affairs Council and ECA...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-28

    ... cooperation and will develop an environmental cooperation Work Program for the 2012-2015 period. All... the ECA, the Governments state that they plan to meet to develop and update, as appropriate, a Work Program for Environmental Cooperation. The Work Program will identify and outline environmental...

  14. Analysis and Prospects of European Co-Operation in the Field of Regional Planning. Activity Report of the Committee of Senior Officials 1976-1978.

    ERIC Educational Resources Information Center

    Council of Europe, Strasbourg (France).

    To guide future work, to provide an overall view of the program of technical cooperation in regional planning, and to form a basis for a Conference Ministerial Resolution, the report outlines the activities of the Committee of Senior Officials (CSO) of the Council of Europe's Conference of Ministers Responsible for Regional Planning during…

  15. Working with a Board of Directors: Making the Partnership Stronger.

    ERIC Educational Resources Information Center

    Ratekin, Cindy; Bess, Gary

    1996-01-01

    Focuses on the role of the board of directors within nonprofit child care centers and how the board and center staff can work well together for the agency. Outlines each partner's role in the four areas of center responsibility: financial oversight, program planning, resource development, and personnel management. (EV)

  16. Unit Planning Grids for Visual Arts--Grade 9-12 Advanced.

    ERIC Educational Resources Information Center

    Delaware State Dept. of Education, Dover.

    This planning grid for teaching visual arts (advanced) in grades 9-12 in Delaware outlines the following six standards for students to complete: (1) students will select and use form, media, techniques, and processes to create works of art and communicate meaning; (2) students will create ways to use visual, spatial, and temporal concepts in…

  17. Computer-Aided Experiment Planning toward Causal Discovery in Neuroscience.

    PubMed

    Matiasz, Nicholas J; Wood, Justin; Wang, Wei; Silva, Alcino J; Hsu, William

    2017-01-01

    Computers help neuroscientists to analyze experimental results by automating the application of statistics; however, computer-aided experiment planning is far less common, due to a lack of similar quantitative formalisms for systematically assessing evidence and uncertainty. While ontologies and other Semantic Web resources help neuroscientists to assimilate required domain knowledge, experiment planning requires not only ontological but also epistemological (e.g., methodological) information regarding how knowledge was obtained. Here, we outline how epistemological principles and graphical representations of causality can be used to formalize experiment planning toward causal discovery. We outline two complementary approaches to experiment planning: one that quantifies evidence per the principles of convergence and consistency, and another that quantifies uncertainty using logical representations of constraints on causal structure. These approaches operationalize experiment planning as the search for an experiment that either maximizes evidence or minimizes uncertainty. Despite work in laboratory automation, humans must still plan experiments and will likely continue to do so for some time. There is thus a great need for experiment-planning frameworks that are not only amenable to machine computation but also useful as aids in human reasoning.

  18. CAD/CAM approach to improving industry productivity gathers momentum

    NASA Technical Reports Server (NTRS)

    Fulton, R. E.

    1982-01-01

    Recent results and planning for the NASA/industry Integrated Programs for Aerospace-Vehicle Design (IPAD) program for improving productivity with CAD/CAM methods are outlined. The industrial group work is being mainly done by Boeing, and progress has been made in defining the designer work environment, developing requirements and a preliminary design for a future CAD/CAM system, and developing CAD/CAM technology. The work environment was defined by conducting a detailed study of a reference design process, and key software elements for a CAD/CAM system have been defined, specifically for interactive design or experiment control processes. Further work is proceeding on executive, data management, geometry and graphics, and general utility software, and dynamic aspects of the programs being developed are outlined

  19. Options for Parallelizing a Planning and Scheduling Algorithm

    NASA Technical Reports Server (NTRS)

    Clement, Bradley J.; Estlin, Tara A.; Bornstein, Benjamin D.

    2011-01-01

    Space missions have a growing interest in putting multi-core processors onboard spacecraft. For many missions processing power significantly slows operations. We investigate how continual planning and scheduling algorithms can exploit multi-core processing and outline different potential design decisions for a parallelized planning architecture. This organization of choices and challenges helps us with an initial design for parallelizing the CASPER planning system for a mesh multi-core processor. This work extends that presented at another workshop with some preliminary results.

  20. EOS Laser Atmosphere Wind Sounder (LAWS) investigation

    NASA Technical Reports Server (NTRS)

    Emmitt, George D.

    1991-01-01

    The related activities of the contract are outlined for the first year. These include: (1) attend team member meetings; (2) support EOS Project with science related activities; (3) prepare and Execution Phase plan; and (4) support LAWS and EOSDIS related work. Attached to the report is an appendix, 'LAWS Algorithm Development and Evaluation Laboratory (LADEL)'. Also attached is a copy of a proposal to the NASA EOS for 'LAWS Sampling Strategies and Wind Computation Algorithms -- Storm-Top Divergence Studies. Volume I: Investigation and Technical Plan, Data Plan, Computer Facilities Plan, Management Plan.'

  1. Women in Academia: Work-Related Stresses.

    ERIC Educational Resources Information Center

    Keim, Jeanmarie; Erickson, Chris

    1998-01-01

    Highlights some of the more common stressors and difficulties faced by women in academia, particularly those of junior rank, in the areas of teaching, scholarship, and service, and outlines effective strategies, including plans for institutions, for overcoming barriers. (SLD)

  2. Discharge planning: a collaboration between provider and payer case managers using Medicare's Conditions of Participation.

    PubMed

    Birmingham, Jackie

    2004-01-01

    Discharge planning is a legally mandated function for hospitals and is one of the "basic" hospital roles as outlined in Medicare's Conditions of Participation. This article will define discharge planning; describe the steps in the discharge planning process; list rules and regulations that influence discharge planning in hospitals; and compare hospital-based actions with payer-based actions when planning discharges. Case managers who work for payers interact with hospital-based case managers to facilitate the discharge planning process for patients. Those who form this patient-provider-payer triangle will benefit by reviewing the dynamics of the discharge planning process.

  3. Aquatic Ecosystem Enhancement at Mountaintop Mining Sites Symposium

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Black, D. Courtney; Lawson, Peter; Morgan, John

    2000-01-12

    Welcome to this symposium which is part of the ongoing effort to prepare an Environmental Impact Statement (EIS) regarding mountaintop mining and valley fills. The EIS is being prepared by the U.S. Environmental Protection Agency, U.S. Army Corps of Engineers, U.S. Office of Surface Mining, and U.S. Fish and Wildlife Service, in cooperation with the State of West Virginia. Aquatic Ecosystem Enhancement (AEE) at mountaintop mining sites is one of fourteen technical areas identified for study by the EIS Interagency Steering Committee. Three goals were identified in the AEE Work Plan: 1. Assess mining and reclamation practices to show howmore » mining operations might be carried out in a way that minimizes adverse impacts to streams and other environmental resources and to local communities. Clarify economic and technical constraints and benefits. 2. Help citizens clarify choices by showing whether there are affordable ways to enhance existing mining, reclamation, mitigation processes and/or procedures. 3. Ide identify data needed to improve environmental evaluation and design of mining projects to protect the environment. Today’s symposium was proposed in the AEE Team Work Plans but coordinated planning for the event began September 15, 1999 when representatives from coal industry, environmental groups and government regulators met in Morgantown. The meeting participants worked with a facilitator from the Canaan Valley Institute to outline plans for the symposium. Several teams were formed to carry out the plans we outlined in the meeting.« less

  4. Administrative and Technical Support for the U.S. Army Medical Research and Development Command Joint Working Group on Medical Chemical Defense

    DTIC Science & Technology

    1989-08-01

    microproces;qor databaAing systems for monitoring project and contract reports and program technology trans. fers, coordinating and providing administratIvo ...The JWGD 3 annual planning process generally included: - Program review by the JWGD’ membership at quarterly meetings, which consisted of the review...Office developed the program planning and budget documents associated with the planning process outlined above. Program project databases and

  5. Shale embankment construction criteria : experimental feature interim report.

    DOT National Transportation Integrated Search

    1985-06-01

    The research was conducted in the summer of 1983 during the realignment construction of the Mystic Creek - Camas Valley section on the Coos Bay - Roseburg Highway. Construction is still in progress. As outlined in the experimental features work plan ...

  6. NOAA/NCEI/Regional Climate Services: Working with Partners and Stakeholders across a Wide Network

    NASA Astrophysics Data System (ADS)

    Mecray, E. L.

    2015-12-01

    Federal agencies all require plans to be prepared at the state level that outline the implementation of funding to address wildlife habitat, human health, transportation infrastructure, coastal zone management, environmental management, emergency management, and others. These plans are now requiring the consideration of changing climate conditions. So where does a state turn to discuss lessons learned, obtain tools and information to assess climate conditions, and to work with other states in their region? Regional networks and collaboratives are working to deliver this sector by sector. How do these networks work? Do they fit together in any way? What similarities and differences exist? Is anyone talking across these lines to find common climate information requirements? A sketch is forming that links these efforts, not by blending the sectors, but by finding the areas where coordination is critical, where information needs are common, and where delivery mechanisms can be streamlined. NOAA/National Centers for Environmental Information's Regional Climate Services Directors have been working at the interface of stakeholder-driven information delivery since 2010. This talk will outline the regional climate services delivery framework for the Eastern Region, with examples of regional products and information.

  7. Pedagogical Approaches to Cooperative Education in South Africa: A Work-Integrated Learning Model for the Public Relations Industry

    ERIC Educational Resources Information Center

    Rampersad, Renitha

    2010-01-01

    The pedagogy relevant to work-integrated learning (WIL) has formed a significant component of most educational processes and has become a necessity for the public relations industry in South Africa. Properly planned, designed and monitored programmes expose students to professional culture and workplace practice. This paper outlines the pedagogy…

  8. A Proposal: The Circular School Year.

    ERIC Educational Resources Information Center

    Reeves, Robert L.

    A proposed plan outlined in this speech divides the school year into three instructional units of 12 weeks each during which time student attendance is required. Three interim units of 15 work days and five vacation days are scheduled in April, August, and December. These interim units are designed to be used by students for remedial work,…

  9. Using a Theory of Action to Develop Performance Indicators to Measure Progress toward a SIMR

    ERIC Educational Resources Information Center

    Schiller, Ellen; Hayes, Susan; Nagle, Katherine

    2015-01-01

    This white paper offers an approach for using a theory of action as an outline to develop the SSIP [State Systemic Improvement Plan] Phase II evaluation questions and plan that will guide the SSIP work in Phase III and beyond. Key areas of focus include generating evaluation questions at each level of outcomes, identifying essential steps and…

  10. Leisure and Life-Styles of the Elderly: Outline of a Research Programme.

    ERIC Educational Resources Information Center

    Tokarski, Walter

    1987-01-01

    The reduction of lifetime working hours in Western industrialized countries is increasing the need for research, particularly qualitative, on the leisure of the elderly. This approach has been taken in planning a new empirical study. (MSE)

  11. 77 FR 29317 - Fiscal Year 2012 Draft Work Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-17

    ..., the Commission determines its own basic operating principles and funding criteria on an annual federal fiscal year (October 1 to September 30) basis. The Commission outlines these priorities and funding... 2012 Appropriations Summary The Denali Commission has historically received several federal funding...

  12. NASA deep space network operations planning and preparation

    NASA Technical Reports Server (NTRS)

    Jensen, W. N.

    1982-01-01

    The responsibilities and structural organization of the Operations Planning Group of NASA Deep Space Network (DSN) Operations are outlined. The Operations Planning group establishes an early interface with a user's planning organization to educate the user on DSN capabilities and limitations for deep space tracking support. A team of one or two individuals works through all phases of the spacecraft launch and also provides planning and preparation for specific events such as planetary encounters. Coordinating interface is also provided for nonflight projects such as radio astronomy and VLBI experiments. The group is divided into a Long Range Support Planning element and a Near Term Operations Coordination element.

  13. Leading a Successful Reading Program: Administrators and Reading Specialists Working Together to Make It Happen

    ERIC Educational Resources Information Center

    DeVries Guth, Nancy; Pettengill, Stephanie

    2005-01-01

    What's involved in establishing a high-quality literacy program? This book outlines elements such as a schoolwide literacy vision, an involved staff, a strong sense of community, a top-notch resource collection, a plan for monitoring progress, and the right tools to work effectively with students and parents. Here the reader will find: suggestions…

  14. The Personal Responsibility and Work Opportunity Act of 1996: What Welfare Reform Means for Head Start.

    ERIC Educational Resources Information Center

    Shuell, Julie; Hanna, Jeff; Oterlei, Jannell; Kariger, Patricia

    This National Head Start Association booklet outlines the main provisions of the Personal Responsibility and Work Opportunity Act and describes how it may affect local Head Start Programs. The document is intended to serve as a starting point for local programs, parents, administrators and policy workers to discuss and plan how Head Start will…

  15. Estate Planning; A Suggested Outline for an Adult Group. Bulletin 151.

    ERIC Educational Resources Information Center

    New York State Education Dept., Albany. Bureau of Business Education.

    This course outline on estate planning is designed for teachers and leaders in New York State public school adult education programs. Basic elements in estate planning (inventory, objectives, analysis, problem areas, administration, and others) are outlined, followed by information and guidelines on accumulating an estate, conserving an estate,…

  16. 76 FR 33726 - National Ocean Council; Strategic Action Plan Content Outlines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-09

    ...On July 19, 2010, President Obama signed Executive Order 13547 establishing a National Policy for the Stewardship of the Ocean, our Coasts, and the Great Lakes (``National Ocean Policy''). The National Ocean Policy provides an implementation strategy, which describes nine priority objectives that seek to address some of the most pressing challenges facing the ocean, our coasts, and the Great Lakes. The National Ocean Council is responsible for developing strategic action plans for each of the nine priority objectives. As a first step, Federal interagency writing teams have developed content outlines for each draft strategic action plan. The NOC is seeking public review and comment of these content outlines. The purpose of the draft content outlines (outlines) is to provide the public with an initial view of potential actions that could be taken to further the national priority objectives. As such, they are an interim step toward development of the first full draft of each strategic action plan. In developing the outlines, the writing teams were informed by the comments received during an initial public scoping period that closed on April 29. Each outline presents in bulleted form potential actions to further the particular priority objective. It describes the reasons for taking the action, expected outcomes and milestones, gaps and needs in science and technology, and the timeframe for completing the action. The outlines also provide an overview of the priority objective, greater context for the strategic action plan in implementing the National Ocean Policy, and an overview of the preparation of the plan . Public comments received on the outlines will be collated and posted on the NOC Web site. The comments on the outlines will inform the preparation of full draft strategic action plans, which will be released for public review in the fall of 2011, allowing additional opportunity for the public to provide comments. Final strategic action plans are expected to be completed by early 2012.

  17. EUV mask defect inspection and defect review strategies for EUV pilot line and high volume manufacturing

    NASA Astrophysics Data System (ADS)

    Chan, Y. David; Rastegar, Abbas; Yun, Henry; Putna, E. Steve; Wurm, Stefan

    2010-04-01

    Reducing mask blank and patterned mask defects is the number one challenge for extreme ultraviolet lithography. If the industry succeeds in reducing mask blank defects at the required rate of 10X every year for the next 2-3 years to meet high volume manufacturing defect requirements, new inspection and review tool capabilities will soon be needed to support this goal. This paper outlines the defect inspection and review tool technical requirements and suggests development plans to achieve pilot line readiness in 2011/12 and high volume manufacturing readiness in 2013. The technical specifications, tooling scenarios, and development plans were produced by a SEMATECH-led technical working group with broad industry participation from material suppliers, tool suppliers, mask houses, integrated device manufacturers, and consortia. The paper summarizes this technical working group's assessment of existing blank and mask inspection/review infrastructure capabilities to support pilot line introduction and outlines infrastructure development requirements and tooling strategies to support high volume manufacturing.

  18. An Internationally Coordinated Science Management Plan for Samples Returned from Mars

    NASA Astrophysics Data System (ADS)

    Haltigin, T.; Smith, C. L.

    2015-12-01

    Mars Sample Return (MSR) remains a high priority of the planetary exploration community. Such an effort will undoubtedly be too large for any individual agency to conduct itself, and thus will require extensive global cooperation. To help prepare for an eventual MSR campaign, the International Mars Exploration Working Group (IMEWG) chartered the international Mars Architecture for the Return of Samples (iMARS) Phase II working group in 2014, consisting of representatives from 17 countries and agencies. The overarching task of the team was to provide recommendations for progressing towards campaign implementation, including a proposed science management plan. Building upon the iMARS Phase I (2008) outcomes, the Phase II team proposed the development of an International MSR Science Institute as part of the campaign governance, centering its deliberations around four themes: Organization: including an organizational structure for the Institute that outlines roles and responsibilities of key members and describes sample return facility requirements; Management: presenting issues surrounding scientific leadership, defining guidelines and assumptions for Institute membership, and proposing a possible funding model; Operations & Data: outlining a science implementation plan that details the preliminary sample examination flow, sample allocation process, and data policies; and Curation: introducing a sample curation plan that comprises sample tracking and routing procedures, sample sterilization considerations, and long-term archiving recommendations. This work presents a summary of the group's activities, findings, and recommendations, highlighting the role of international coordination in managing the returned samples.

  19. Handbook on Architectural Services.

    ERIC Educational Resources Information Center

    Adams, Hugh D.; And Others

    Alabama State Building Commission policies and procedures are established for the use of all agencies, architects, and engineers working under the jurisdiction of the Commission. All school construction with the exception of mobile classroom units is covered, and general procedures are outlined followed by the requirements for plan submittals.…

  20. V-TECS Guide for Machine Shop (Machinist).

    ERIC Educational Resources Information Center

    Gregory, Margaret R.; Benson, Robert T.

    This curriculum guide is intended to train trade and industrial education students in the hands-on aspects of the occupation of machinist. Included in the guide are course outlines that deal with the following topics: following safety procedures; performing mathematical calculations; designing and planning machine work; performing precision…

  1. The task of validation of gas-dynamic characteristics of a multistage centrifugal compressor for a natural gas booster compressor station

    NASA Astrophysics Data System (ADS)

    Danilishin, A. M.; Kozhukhov, Y. V.; Neverov, V. V.; Malev, K. G.; Mironov, Y. R.

    2017-08-01

    The aim of this work is the validation study for the numerical modeling of characteristics of a multistage centrifugal compressor for natural gas. In the research process was the analysis used grid interfaces and software systems. The result revealed discrepancies between the simulated and experimental characteristics and outlined the future work plan.

  2. Planning, scheduling, and control for automatic telescopes

    NASA Technical Reports Server (NTRS)

    Drummond, Mark; Swanson, Keith; Philips, Andy; Levinson, Rich; Bresina, John

    1992-01-01

    This paper presents an argument for the appropriateness of Entropy Reduction Engine (ERE) technology to the planning, scheduling, and control components of Automatic Photoelectric Telescope (APT) management. The paper is organized as follows. In the next section, we give a brief summary of the planning and scheduling requirements for APTs. Following this, in section 3, we give an ERE project precis, couched primarily in terms of project objectives. Section 4 gives a sketch of the match-up between problem and technology, and section 5 outlines where we want to go with this work.

  3. Anhydrous Ammonia Training Module. Trainer's Package. Participant's Package.

    ERIC Educational Resources Information Center

    Beaudin, Bart; And Others

    This document contains a trainer's and a participant's package for teaching employees on site safe handling procedures for working with anhydrous ammonia, especially on farms. The trainer's package includes the following: a description of the module; a competency; objectives; suggested instructional aids; a training outline (or lesson plan) for…

  4. Strategic directions and mechanisms in technology transfer

    NASA Technical Reports Server (NTRS)

    Mackin, Robert

    1992-01-01

    An outline summarizing the Working Panel discussion related to strategic directions for technology transfer is presented. Specific topics addressed include measuring success, management of technology, innovation and experimentation in the tech transfer process, integration of tech transfer into R&D planning, institutionalization of tech transfer, and policy/legislative resources.

  5. Income Taxation of Academics Studying or Teaching Abroad.

    ERIC Educational Resources Information Center

    Karjala, Dennis S.

    1994-01-01

    The income tax options available to college faculty who work abroad while maintaining ties to a U.S. academic institution are outlined, and the role of planning in optimizing those choices is explained. Issues addressed include definition of taxable income, record-keeping, distinction between exclusions and deductions, and fellowships. (MSE)

  6. 77 FR 30509 - Fiscal Year 2012 Draft Work Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-23

    ... determines its own basic operating principles and funding criteria on an annual federal fiscal year (October 1 to September 30) basis. The Commission outlines these priorities and funding recommendations in an... federal funding sources (identified by the varying colors in the table below). These fund sources are...

  7. Role of Open and Distance Education in Integrating Education with Development--Emerging Model of Networked Collaborative Learning and Net-working.

    ERIC Educational Resources Information Center

    Takwale, Ram

    1998-01-01

    Discusses the evolution of the educational system in India, developments in new communication technologies, and plans by the open and distance education system to develop educational networks. Policies and programs adopted by the Distance Education Council are outlined. (AEF)

  8. Career Exploration Curriculum Guide. (Prototype).

    ERIC Educational Resources Information Center

    Great Falls Public Schools, MT.

    Materials contained in this curriculum guide include daily lesson plan outlines for an eighteen-week Experience Based Career Education (EBCE) class. Learning experiences are suggested to meet the following major objectives of the class: (1) Develop students' understanding of the role of work in society and the multiple aspects of their career…

  9. Introduction to Media.

    ERIC Educational Resources Information Center

    Riler, Robert

    Designed for senior high school students, this one semester course focuses on four aspects of modern media: television, film, radio, and advertising. Each topic is worked into a weekly lesson plan format that stresses the active involvement of students in the learning process. The course outline contains lists of objectives and media materials…

  10. Co-creating Emotionally Safe Environments at Camp: Training Staff To Facilitate Adventure Activities.

    ERIC Educational Resources Information Center

    Brownlee, Matt; Yerkes, Rita

    2003-01-01

    An emotionally safe environment helps campers participate in adventure activities. Staff development tips for creating a safe environment include using cooperative goal setting; using parallel training processes; developing working lesson plans that outline facilitation techniques for creating emotionally safe environments; and using co-created…

  11. The Rationalization of Everything? Using Ritzer's McDonaldization Thesis To Teach Weber.

    ERIC Educational Resources Information Center

    Lippmann, Stephen; Aldrich, Howard

    2003-01-01

    Outlines a plan for helping undergraduate students appreciate Max Weber's theoretical achievements, teaching critical thinking about what constitutes 'the good life' in rationalized societies. Uses the book "The McDonaldization of Society" (George Ritzer) to encourage student interest in Weber's work. Describes field exercises and…

  12. Creating Meaning from Intersections of Career and Cultural Identity

    ERIC Educational Resources Information Center

    Gross, Linda S.

    2004-01-01

    For Latino students, career development and planning includes the negotiation of family influences, peer expectations, and challenges as they develop career efficacy in work experiences as undergraduates. The model presented here outlines how students can benefit from a holistic perspective on the intersections of career and cultural identity.…

  13. Working with Angry Parents: Taking a Customer Service Approach.

    ERIC Educational Resources Information Center

    Phipps, Patricia A.

    1998-01-01

    Discusses ways child care personnel can develop a proactive customer service plan that meets families' needs and expectations while minimizing the probability of confrontations with angry parents. Outlines a five-step conflict-resolution strategy that offers a "win-win" approach for both parents and providers when problems do occur. (TJQ)

  14. Site Safety Plan for Lawrence Livermore National Laboratory CERCLA investigations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bainer, R.; Duarte, J.

    1993-07-01

    The safety policy of LLNL is to take every reasonable precaution in the performance of work to protect the environment and the health and safety of employees and the public, and to prevent property damage. With respect to hazardous agents, this protection is provided by limiting human exposures, releases to the environment, and contamination of property to levels that are as low as reasonably achievable (ALARA). It is the intent of this Plan to supply the broad outline for completing environmental investigations within ALARA guidelines. It may not be possible to determine actual working conditions in advance of the work;more » therefore, planning must allow the opportunity to provide a range of protection based upon actual working conditions. Requirements will be the least restrictive possible for a given set of circumstances, such that work can be completed in an efficient and timely fashion. Due to the relatively large size of the LLNL Site and the different types of activities underway, site-specific Operational Safety Procedures (OSPs) will be prepared to supplement activities not covered by this Plan. These site-specific OSPs provide the detailed information for each specific activity and act as an addendum to this Plan, which provides the general plan for LLNL Main Site operation.« less

  15. Artist's concept of Hadley-Apennine landing site with LRV traverses outlined

    NASA Technical Reports Server (NTRS)

    1971-01-01

    An artist's concept of the Hadley-Apennine landing site, depicting the traverses planned on the Apollo 15 lunar landing mission using the Lunar Roving Vehicle (LRV). The Roman numerals indicate the three periods of extravehicular activity (EVA). The Arabic numbers represent the station stops. Art work by Jerry Elmore.

  16. Metals and Alloys; Machine Shop Work 3: 9557.03.

    ERIC Educational Resources Information Center

    Dade County Public Schools, Miami, FL.

    The course outline has been prepared as a guide to assist the instructor in systematically planning and presenting a variety of meaningful lessons to facilitate the necessary training for the machine shop student. The materials are designed to enable the student to learn the manipulative skills and related knowledge necessary to understand…

  17. Tips for Teachers: Lesson Plans and Ideas from around the World.

    ERIC Educational Resources Information Center

    Mathieson, Murray; And Others

    1990-01-01

    The following ideas are presented: (1) working together in calculus, including a handout for a jigsaw lesson; (2) a lesson on water and ecology from the USSR using the collective teaching technique; (3) the Israeli Havruta "Companionship" method for peer teaching; and (4) an origami lesson outlined and illustrated. (JD)

  18. Tao of Gateway: Providing Internet Access to Licensed Databases.

    ERIC Educational Resources Information Center

    McClellan, Gregory A.; Garrison, William V.

    1997-01-01

    Illustrates an approach for providing networked access to licensed databases over the Internet by positioning the library between patron and vendor. Describes how the gateway systems and database connection servers work and discusses how treatment of security has evolved with the introduction of the World Wide Web. Outlines plans to reimplement…

  19. Training Teachers To Work in Schools Considered Difficult. Fundamentals of Educational Planning Series, Number 59.

    ERIC Educational Resources Information Center

    Auduc, Jean-Louis

    This book outlines challenges involved in ensuring that teacher training becomes the gateway to implementation of appropriate strategies for students to achieve and for managing the problems of authority, discipline, and aggressive behavior. The six chapters examine: (1) "Teaching in Schools or Classes Considered Difficult: A Contemporary…

  20. Pre-Employment Laboratory Training. General Agricultural Mechanics Volume II. Instructional Materials.

    ERIC Educational Resources Information Center

    Texas A and M Univ., College Station. Vocational Instructional Services.

    This course outline, the second volume of a two-volume set, consists of lesson plans for pre-employment laboratory training in general agricultural mechanics. Covered in the eight lessons included in this volume are cold metal work, soldering, agricultural safety programs, farm shops, farm structures, farm and ranch electrification, soil and water…

  1. MACHINE TOOL OPERATOR--GENERAL, ENTRY, SUGGESTED GUIDE FOR A TRAINING COURSE.

    ERIC Educational Resources Information Center

    RONEY, MAURICE W.; AND OTHERS

    THE PURPOSE OF THIS CURRICULUM GUIDE IS TO ASSIST THE ADMINISTRATOR AND INSTRUCTOR IN PLANNING AND DEVELOPING MANPOWER DEVELOPMENT AND TRAINING PROGRAMS TO PREPARE MACHINE TOOL OPERATORS FOR ENTRY-LEVEL POSITIONS. THE COURSE OUTLINE PROVIDES UNITS IN -- (1) ORIENTATION, (2) BENCH WORK, (3) SHOP MATHEMATICS, (4) BLUEPRINT READING AND SKETCHING, (5)…

  2. Risk assessment and management of radiofrequency radiation exposure

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dabala, Dana; Surducan, Emanoil; Surducan, Vasile

    2013-11-13

    Radiofrequency radiation (RFR) industry managers, occupational physicians, security department, and other practitioners must be advised on the basic of biophysics and the health effects of RF electromagnetic fields so as to guide the management of exposure. Information on biophysics of RFR and biological/heath effects is derived from standard texts, literature and clinical experiences. Emergency treatment and ongoing care is outlined, with clinical approach integrating the circumstances of exposure and the patient's symptoms. Experimental risk assessment model in RFR chronic exposure is proposed. Planning for assessment and monitoring exposure, ongoing care, safety measures and work protection are outlining the proper management.

  3. Risk assessment and management of radiofrequency radiation exposure

    NASA Astrophysics Data System (ADS)

    Dabala, Dana; Surducan, Emanoil; Surducan, Vasile; Neamtu, Camelia

    2013-11-01

    Radiofrequency radiation (RFR) industry managers, occupational physicians, security department, and other practitioners must be advised on the basic of biophysics and the health effects of RF electromagnetic fields so as to guide the management of exposure. Information on biophysics of RFR and biological/heath effects is derived from standard texts, literature and clinical experiences. Emergency treatment and ongoing care is outlined, with clinical approach integrating the circumstances of exposure and the patient's symptoms. Experimental risk assessment model in RFR chronic exposure is proposed. Planning for assessment and monitoring exposure, ongoing care, safety measures and work protection are outlining the proper management.

  4. Manned remote work station development article. Volume 3: Development test plan. Appendix A: Manufacturing requirements/schedule

    NASA Technical Reports Server (NTRS)

    1979-01-01

    The tests and procedures for the manned remote work station (MRWS) open cherry picker (OCP) development test article (DTA) are described to validate systems requirements and performance specifications. A development test program is outlined to evaluate key design issues and man/machine interfaces when the MRWS OCP is used in a shuttle support role of satellite servicing and in orbit construction of large structures.

  5. Model Curriculum Emphasizing Transition: A Curriculum Planning Guide for Students with Mild Disabilities.

    ERIC Educational Resources Information Center

    Andersen, Lee; And Others

    This curriculum emphasizes successful transition from school to work and to a quality adult life for students with mild disabilities. The curriculum includes a scope and sequence outlining 11 subject matter content areas, covering tasks appropriate for learners from a developmental age of 1 month to 21 years. The 11 content areas include…

  6. From Accountability to Actionability: Making Sense of Multiple Measures in Local Control Accountability Plans. Policy Brief

    ERIC Educational Resources Information Center

    Beach, Paul; Thier, Michael; Lench, Sarah Collins; Coleman, Matt

    2015-01-01

    "Understanding Entry-Level Courses in American Institutions of Higher Education" outlines a study conducted by EPIC that empirically identifies the characteristics of work at the college- and career-readiness level in English/language arts, science, and social sciences courses. Using a previously collected national sample of over two…

  7. Masonry. Progress Record, Theory Outline.

    ERIC Educational Resources Information Center

    Connecticut State Dept. of Education, Hartford. Div. of Vocational-Technical Schools.

    Intended to reduce unnecessary paper work on the part of the shop instructor in a masonry course, this job assignment book offers a simplified method of keeping student records up-to-date. It lists theory objectives and specific objectives for masonry courses in grades 10, 11, and 12. To help the instructor in planning and organizing in advance, a…

  8. An Exploration of Online Environments Supporting Follow-Up to Face-to-Face Professional Development

    ERIC Educational Resources Information Center

    Green, Marybeth; Cifuentes, Lauren

    2008-01-01

    In this study we examined the effects of online follow-up and online peer interaction following a face-to face professional development workshop on attitudes towards that professional development and completion of a professional development task. School librarians were invited to work online on a three page plan outlining interventions a library…

  9. Making the Most of Opportunities to Learn What Works: A School District's Guide. REL 2014-048

    ERIC Educational Resources Information Center

    Akers, Lauren; Resch, Alexandra; Berk, Jillian

    2014-01-01

    This guide for district and school leaders shows how to recognize opportunities to embed randomized controlled trials (RCTs) into planned policies or programs. Opportunistic RCTs can generate strong evidence for informing education decisions--with minimal added cost and disruption. The guide also outlines the key steps to conduct RCTs and responds…

  10. Professional Learning Communities by Design: Putting the Learning Back into PLCs

    ERIC Educational Resources Information Center

    Easton, Lois Brown

    2011-01-01

    If you are looking for an organic approach to purpose-driven professional learning, this is the book for you. Award-winning educator Lois Brown Easton's latest work provides a compelling case study in narrative form, a chronological PLC planning outline, and first-hand "lessons learned" about how PLCs develop, mature, and sustain themselves. You…

  11. School Climate Improvement Action Guide for Working with Students. School Climate Improvement Resource Package

    ERIC Educational Resources Information Center

    National Center on Safe Supportive Learning Environments, 2017

    2017-01-01

    Improving school climate takes time and commitment from a variety of people in a variety of roles. This document outlines key action steps to engage students in the school climate improvement process. Key action steps are provided for the following strategies: (1) Participate in planning for school climate improvements; (2) Engage stakeholders in…

  12. School Climate Improvement Action Guide for Working with Families. School Climate Improvement Resource Package

    ERIC Educational Resources Information Center

    National Center on Safe Supportive Learning Environments, 2017

    2017-01-01

    Improving school climate takes time and commitment from a variety of people in a variety of roles. This document outlines how family members--including guardians of students--can support school climate improvements. Key action steps are provided for the following strategies: (1) Participate in planning for school climate improvements; (2) Engage…

  13. Psychiatrist Health Human Resource Planning - An Essential Component of a Hospital-Based Mental Healthcare System Transformation.

    PubMed

    Jarmain, Sarah

    2016-01-01

    The World Health Organization (WHO) defines health human resource planning as "the process of estimating the number of persons and the kinds of knowledge, skills, and attitudes they need to achieve predetermined health targets and ultimately health status objectives" (OHA 2015). Health human resource planning is a critical component of successful organizational and system transformation, and yet little has been written on how to do this for physicians at the local level. This paper will outline a framework for developing and managing key aspects of physician human resource planning related to both the quantity and quality of work within a hospital setting. Using the example of a complex multiphase hospital-based mental health transformation that involved both the reduction and divestment of beds and services, we will outline how we managed the physician human resource aspects to establish the number of psychiatrists needed and the desired attributes of those psychiatrists, and how we helped an existing workforce transition to meet the new expectations. The paper will describe a process for strategically aligning the selection and management of physicians to meet organizational vision and mandate.

  14. The Mayor's Plan for Achieving Success in the DCPS: Is the Implementation Likely to Match the Vision?

    ERIC Educational Resources Information Center

    Council of the Great City Schools, 2007

    2007-01-01

    The Mayor Adrian Fenty's achievement plan for the District of Columbia Public Schools (DCPS) is divided into four major parts. The first section outlines the philosophical foundation undergirding the plan. The second section outlines the plan's goals and strategies. In preparing this commentary, the Council of the Great City Schools assessed how…

  15. Advanced Simulation and Computing Fiscal Year 2016 Implementation Plan, Version 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCoy, M.; Archer, B.; Hendrickson, B.

    2015-08-27

    The Stockpile Stewardship Program (SSP) is an integrated technical program for maintaining the safety, surety, and reliability of the U.S. nuclear stockpile. The SSP uses nuclear test data, computational modeling and simulation, and experimental facilities to advance understanding of nuclear weapons. It includes stockpile surveillance, experimental research, development and engineering programs, and an appropriately scaled production capability to support stockpile requirements. This integrated national program requires the continued use of experimental facilities and programs, and the computational capabilities to support these programs. The purpose of this IP is to outline key work requirements to be performed and to control individualmore » work activities within the scope of work. Contractors may not deviate from this plan without a revised WA or subsequent IP.« less

  16. The Pliocene Citronelle Formation of the Gulf Coastal Plain

    USGS Publications Warehouse

    Matson, George Charlton

    1916-01-01

    In the spring of 1910 the writer, working under the direction of T. Wayland Vaughan, geologist in charge of Coastal Plain investigations, undertook a study of the later Tertiary formations of the Gulf Coastal Plain. According to the plans outlined before the work was begun, the beds that had formerly been grouped under the names Lafayette formation and Grand Gulf formation were to be studied with a view to their possible separation into more satisfactory stratigraphic units that might be correlated with other formations which, on the basis of their fossils, had been assigned to their proper positions in the geologic time scale. The original plan included a study of the post-Vicksburgian Tertiary deposits from western Florida to Mississippi River and correlations with formations previously recognized in Florida, southern Alabama, and Louisiana. This plan was subsequently modified to extend the investigation as far west as Sabine River. The field work was interrupted and the office work was delayed by calls for geologic work in other areas, so that the preparation of the reports could not be begun until the spring of 1914.

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, L. M.; Environmental Science Division

    This Work Plan outlines the scope of work to be conducted to investigate the subsurface contaminant conditions at the property formerly leased by the Commodity Credit Corporation (CCC) in Powhattan, Kansas (Figure 1.1). Data obtained during this event will be used to (1) evaluate potential contaminant source areas on the property; (2) determine the vertical and horizontal extent of potential contamination; and (3) provide recommendations for future action, with the ultimate goal of assigning this site No Further Action status. The planned investigation includes groundwater monitoring requested by the Kansas Department of Health and Environment (KDHE), in accordance with Sectionmore » V of the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the U.S. Department of Agriculture (USDA). The work is being performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. A nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy, Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at former CCC/USDA grain storage facilities. Argonne issued a Master Work Plan (Argonne 2002) that has been approved by the KDHE. The Master Work Plan describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. It should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Powhattan.« less

  18. Report of the Terrestrial Bodies Science Working Group. Volume 1: Executive summary. [Terrestrial planets, Galilean satellites, Comets, Asteroids, and the Moon

    NASA Technical Reports Server (NTRS)

    1977-01-01

    Current knowledge of Mercury, Venus, Mars, the Moon, asteroids, comets, and the Galilean satellites were reviewed along with related NASA programs and available mission concepts. Exploration plans for the 1980 to 1990 period are outlined and recommendations made. Topics discussed include: scientific objectives and goals, exploration strategy and recommended mission plans, supporting research and technology, Earth-based and Earth-orbital investigations, data analysis and synthesis, analysis of extraterrestrial materials, broadening the science support base, and international cooperation.

  19. Collaborations for Building Tribal Resiliency to Climate Change

    NASA Astrophysics Data System (ADS)

    Bamzai, A.; Taylor, A.; Winton, K.

    2015-12-01

    Sixty-eight tribes are located in the U.S. Department of the Interior's South Central Climate Science Center (SCCSC) region. The SCCSC made it a priority to include the tribes as partners from its inception and both the Chickasaw Nation and the Choctaw Nation of Oklahoma participate in the center's activities as consortium members. Under this arrangement, the SCCSC employs a full-time tribal liaison to facilitate relations with the tribes, develop partnerships for climate-relevant projects, build tribal stakeholder capacity, and organize tribal youth programs. In 2014, the SCCSC published its Tribal Engagement Strategy (USGS Circular 1396) to outline its approach for developing tribal relationships. The conceptual plan covers each step in the multi-year process from initial introductory meetings and outreach to demonstrate commitment and interest in working with tribal staff, building tribal capacity in climate related areas while also building researcher capacity in ethical research, and facilitating the co-production of climate-relevant research projects. As the tribes begin to develop their internal capacity and find novel ways to integrate their interests, the plan ultimately leads to tribes developing their own independent research projects and integrating climate science into their various vulnerability assessments and adaptation plans. This presentation will outline the multiple steps in the SCCSC's Tribal Engagement Strategy and provide examples of our ongoing work in support of each step.

  20. OpenGov Plan 3.0 Outline

    EPA Pesticide Factsheets

    This document serves as an outline for the structure of the Agency’s Open Government Plan 3.0, expected to be published later this summer, along with a description of a candidate being consider as a flagship project.

  1. Neural networks application to divergence-based passive ranging

    NASA Technical Reports Server (NTRS)

    Barniv, Yair

    1992-01-01

    The purpose of this report is to summarize the state of knowledge and outline the planned work in divergence-based/neural networks approach to the problem of passive ranging derived from optical flow. Work in this and closely related areas is reviewed in order to provide the necessary background for further developments. New ideas about devising a monocular passive-ranging system are then introduced. It is shown that image-plan divergence is independent of image-plan location with respect to the focus of expansion and of camera maneuvers because it directly measures the object's expansion which, in turn, is related to the time-to-collision. Thus, a divergence-based method has the potential of providing a reliable range complementing other monocular passive-ranging methods which encounter difficulties in image areas close to the focus of expansion. Image-plan divergence can be thought of as some spatial/temporal pattern. A neural network realization was chosen for this task because neural networks have generally performed well in various other pattern recognition applications. The main goal of this work is to teach a neural network to derive the divergence from the imagery.

  2. Coaching in the Library: A Management Strategy for Achieving Excellence. Second Edition

    ERIC Educational Resources Information Center

    Metz, Ruth F.

    2010-01-01

    Experienced librarian and coach Ruth Metz outlines a focused and results-oriented plan for achieving the best results from staff members through a coaching style of management. Real-world examples and coaching scenarios specific to library work will help librarians: (1) Be both a coach and a player by learning the terminology and techniques; (2)…

  3. Comparative Study of State Case Review Systems Phase II: Dispositional Hearings. National Survey. Volume I.

    ERIC Educational Resources Information Center

    Cahalan, Margaret; And Others

    Under the Adoption Assistance and Child Welfare Act of 1980 (P.L. 96-272), Congress outlined a case review system to assure that child welfare agencies monitor children under their care, that parental and child rights are protected, that agencies periodically report progress in implementing case plans, and that agencies work toward a permanent…

  4. Distance Education: A University's Pioneering Master of Social Work Program Partnership with the U.S. Army

    ERIC Educational Resources Information Center

    Brown, Terri Moore; Freeman, Dexter

    2010-01-01

    This article describes the relevance of an army-university partnership in view of the cultures of both public higher education and the military graduate education system. The article also outlines the planning model used to navigate through the various issues that should be considered when a university partners with a federal or military agency to…

  5. Following Through: Representing the Voice of Graduate Students

    ERIC Educational Resources Information Center

    Amankwatia, Tonya; Barbour, Michael; Inan, Fethi A.; Parker, Preston; Slagter van Tryon, Patricia J.

    2007-01-01

    The 2006 Class of AECT Interns has from the outset been uniquely involved and proactive in supporting the goals of the ect Foundation and of AECT. This article further illustrates the good work this group is doing to support their mutual mission and goals. In the March/April 2007 issue of "Tech Trends," the authors outlined their plans for the…

  6. NAEP Reconfigured: An Integrated Redesign of the National Assessment of Educational Progress. Working Paper Series.

    ERIC Educational Resources Information Center

    Johnson, Eugene G.; Lazer, Stephen; O'Sullivan, Christine Y.

    Chapters in this report outline the potential plans for the redesign of the National Assessment of Educational Progress (NAEP). It is argued that any successful redesign must consider the NAEP as a whole. This report reviews overall NAEP designs and discusses the implications that each of the designs has for various functional areas. The following…

  7. Humanizing the Teaching of Physics through Storytelling: The Case of Current Electricity

    ERIC Educational Resources Information Center

    Hadzigeorgiou, Yannis

    2006-01-01

    The main purpose of this article is to discuss the potential role of storytelling in the teaching and learning of physics. I first present the main historical events concerning the discovery of current electricity by focusing on the Galvani-Volta controversy and the work of Michael Faraday. Then I outline a planning framework for teaching through…

  8. Trend indicators needed for effective recreation planning - a statistical blueprint for the 80's

    Treesearch

    H. Fred Kaiser; George H. Moeller

    1980-01-01

    Here we outline important elements in recreation planning and describe how the process is changing, using Federal land management agencies as our example. We outline some factors that will impact on planning in the 80's, encourage establishment of a system to monitor trends in key factors that influence recreation behavior.

  9. Building a vision for the future: strategic planning in a shared governance nursing organization.

    PubMed

    Baker, C; Beglinger, J E; Bowles, K; Brandt, C; Brennan, K M; Engelbaugh, S; Hallock, T; LaHam, M

    2000-06-01

    Today's health care delivery environment is marked by extreme turbulence and ever-increasing complexity. Now, more than ever, an organization's strategic plan must do more than outline a business plan. Rather, the strategic plan is a fundamental tool for building and sustaining an organizational vision for the future. The strong, dynamic strategic plan (1) represents a long-range vision for improving organizational performance, (2) provides a model for planning and implementing structures and processes for the management of outcomes, (3) reflects and shapes the organizational culture and customer focus, (4) provides decision support for difficult operational choices made day to day, and (5) integrates and aligns the work of the organization. This article describes the development, implementation, and evaluation of a methodology for strategic planning within a shared governance nursing organization. Built upon the strategic plan of the hospital, the process undertaken by the nursing organization reflects the following commitments: (1) to develop a strategic plan that is meaningful and part of daily work life at all levels of the nursing organization, (2) to make the plan practical and realistic through incremental building, (3) to locate and articulate accountability for each step, and (4) to build in a process for checking progress toward goal achievement and readjusting the plan as necessary.

  10. Preparatory planning framework for Created Out of Mind: Shaping perceptions of dementia through art and science

    PubMed Central

    Brotherhood, Emilie; Ball, Philip; Camic, Paul M; Evans, Caroline; Fox, Nick; Murphy, Charlie; Walsh, Fergus; West, Julian; Windle, Gill; Billiald, Sarah; Firth, Nicholas; Harding, Emma; Harrison, Charles; Holloway, Catherine; Howard, Susanna; McKee-Jackson, Roberta; Jones, Esther; Junghaus, Janette; Martin, Harriet; Nolan, Kailey; Rollins, Bridie; Shapiro, Lillian; Shapiro, Lionel; Twigg, Jane; van Leeuwen, Janneke; Walton, Jill; Warren, Jason; Wray, Selina; Yong, Keir; Zeilig, Hannah; Crutch, Sebastian

    2017-01-01

    Created Out of Mind is an interdisciplinary project, comprised of individuals from arts, social sciences, music, biomedical sciences, humanities and operational disciplines. Collaboratively we are working to shape perceptions of dementias through the arts and sciences, from a position within the Wellcome Collection. The Collection is a public building, above objects and archives, with a porous relationship between research, museum artefacts, and the public.  This pre-planning framework will act as an introduction to Created Out of Mind. The framework explains the rationale and aims of the project, outlines our focus for the project, and explores a number of challenges we have encountered by virtue of working in this way. PMID:29387805

  11. National Institutes of Health Research Plan on Rehabilitation.

    PubMed

    2017-04-01

    One in five Americans experiences disability that affects their daily function because of impairments in mobility, cognitive function, sensory impairment, or communication impairment. The need for rehabilitation strategies to optimize function and reduce disability is a clear priority for research to address this public health challenge. The National Institutes of Health (NIH) recently published a Research Plan on Rehabilitation that provides a set of priorities to guide the field over the next 5 years. The plan was developed with input from multiple Institutes and Centers within the NIH, the National Advisory Board for Medical Rehabilitation Research, and the public. This article provides an overview of the need for this research plan, an outline of its development, and a listing of six priority areas for research. The NIH is committed to working with all stakeholder communities engaged in rehabilitation research to track progress made on these priorities and to work to advance the science of medical rehabilitation. Copyright © 2017 The Authors. Published by Elsevier Inc. All rights reserved.

  12. ELEMENTARY SCIENCE OUTLINE, A GUIDE TO SUGGESTED CURRICULUM PRACTICES IN ELEMENTARY SCHOOL SCIENCE.

    ERIC Educational Resources Information Center

    KARTSOTIS, A. THOMAS; MESSERSCHMIDT, RALPH M.

    THE COMMITTEE ON ELEMENTARY SCHOOL SCIENCE OF THE LEHIGH VALLEY SCHOOL STUDY COUNCIL REPORTS THEIR WORK ON SUGGESTED CURRICULUM FOR GRADES 1-6. THE BELIEF IS THAT SCIENCE IS A MAJOR STUDY AREA IN ELEMENTARY SCHOOL, AND SHOULD BE TAUGHT TO ALL PUPILS IN A PLANNED LEARNING SEQUENCE, WITH DUE CONSIDERATION BEING GIVEN TO THE MATURITY OF THE CHILD.…

  13. DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, L. M.

    This Work Plan outlines the scope of work that will be conducted to investigate the subsurface contaminant conditions at the property formerly leased by the Commodity Credit Corporation (CCC) in Ramona, Kansas (Figure 1.1). Data obtained during this event will be used to (1) evaluate potential source areas on the property, (2) determine the vertical and horizontal extent of potential contamination, and (3) provide recommendations for future actions, with the ultimate goal of assigning this site No Further Action status. The planned investigation includes groundwater monitoring requested by the Kansas Department of Health and Environment (KDHE), in accordance with Sectionmore » V of the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the United States Department of Agriculture (USDA). The work is being performed on behalf of the CCC/USDA by the Environmental Research Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy. Under the Intergovernmental Agreement, Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at former CCC/USDA grain storage facilities. Argonne has issued a Master Work Plan (Argonne 2002) that describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. The Master Work Plan was approved by the KDHE. It contains materials common to investigations at locations in Kansas and should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Ramona.« less

  14. Managing aggression in the emergency department: promoting an interdisciplinary approach.

    PubMed

    Rintoul, Yvonne; Wynaden, Dianne; McGowan, Sunita

    2009-04-01

    Incidents of aggression are frequent occurrences in hospitals, particularly the emergency department. Aggression creates instability in the environment, impacts on patient care outcomes and leads to increased levels of stress in staff. Regular exposure to aggression in the workplace can have detrimental effects on health professionals' ongoing quality of life. The emergency department is a gateway to care and is heavily populated 24h a day. Therefore, it is essential that all health professionals are confident and well prepared to manage aggression. Based upon a review of the literature this paper outlines the causes of aggression and provides an interdisciplinary action plan for intervening with aggressive patients in the emergency department. The importance of interdisciplinary ownership and the well planned management of aggression are outlined. When well managed, the impact of aggression can be limited. Stability in the emergency department ensures that health professionals can be responsive to the community's needs for emergency care. This leads to the provision of effective and timely care and a stable work environment for all health professionals.

  15. Spent nuclear fuel project high-level information management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Main, G.C.

    1996-09-13

    This document presents the results of the Spent Nuclear Fuel Project (SNFP) Information Management Planning Project (IMPP), a short-term project that identified information management (IM) issues and opportunities within the SNFP and outlined a high-level plan to address them. This high-level plan for the SNMFP IM focuses on specific examples from within the SNFP. The plan`s recommendations can be characterized in several ways. Some recommendations address specific challenges that the SNFP faces. Others form the basis for making smooth transitions in several important IM areas. Still others identify areas where further study and planning are indicated. The team`s knowledge ofmore » developments in the IM industry and at the Hanford Site were crucial in deciding where to recommend that the SNFP act and where they should wait for Site plans to be made. Because of the fast pace of the SNFP and demands on SNFP staff, input and interaction were primarily between the IMPP team and members of the SNFP Information Management Steering Committee (IMSC). Key input to the IMPP came from a workshop where IMSC members and their delegates developed a set of draft IM principles. These principles, described in Section 2, became the foundation for the recommendations found in the transition plan outlined in Section 5. Availability of SNFP staff was limited, so project documents were used as a basis for much of the work. The team, realizing that the status of the project and the environment are continually changing, tried to keep abreast of major developments since those documents were generated. To the extent possible, the information contained in this document is current as of the end of fiscal year (FY) 1995. Programs and organizations on the Hanford Site as a whole are trying to maximize their return on IM investments. They are coordinating IM activities and trying to leverage existing capabilities. However, the SNFP cannot just rely on Sitewide activities to meet its IM requirements. While the SNFP can use some work done Sitewide and by projects such as the Tank Waste Remediation System (TWRS), they will still need to make some IM investments of their own.« less

  16. FFTF-cycle 10 program and future plan

    NASA Astrophysics Data System (ADS)

    Kohyama, Akira

    1988-04-01

    Brief outlines are provided of the FFTF cycle 10 program and future plans in consideration. The primary objective of the Japan-US collaboration program is to enable predictions of material behavior in MFRs to be made from data obtained in other irradiation environments. Major program goals are outlined.

  17. Space Interferometry Science Working Group

    NASA Astrophysics Data System (ADS)

    Ridgway, Stephen T.

    1992-12-01

    Decisions taken by the astronomy and astrophysics survey committee and the interferometry panel which lead to the formation of the Space Interferometry Science Working Group (SISWG) are outlined. The SISWG was formed by the NASA astrophysics division to provide scientific and technical input from the community in planning for space interferometry and in support of an Astrometric Interferometry Mission (AIM). The AIM program hopes to measure the positions of astronomical objects with a precision of a few millionths of an arcsecond. The SISWG science and technical teams are described and the outcomes of its first meeting are given.

  18. Teaching Fair Use with Astronomy Imagery

    NASA Astrophysics Data System (ADS)

    Wilson, Teresa

    2016-01-01

    Plagiarism among students is most common because of a misunderstanding of copyright and fair use. Images and text are frequently used without proper credit to the original author, and works are frequently acknowledged improperly. For example, space imagery is often used in posters, presentations, on the web, on Facebook, and even in the classrooms, but often are not properly cited. A lesson plan on fair use is presented, outlining what constitutes fair use and how to properly acknowledge the work done by artists and authors everywhere, with examples drawn from the Astronomy Picture of the Day (APOD).

  19. Overview of Space Station attached payloads in the areas of solar physics, solar terrestrial physics, and plasma processes

    NASA Technical Reports Server (NTRS)

    Roberts, W. T.; Kropp, J.; Taylor, W. W. L.

    1986-01-01

    This paper outlines the currently planned utilization of the Space Station to perform investigations in solar physics, solar terrestrial physics, and plasma physics. The investigations and instrumentation planned for the Solar Terrestrial Observatory (STO) and its associated Space Station accommodation requirements are discussed as well as the planned placement of the STO instruments and typical operational scenarios. In the area of plasma physics, some preliminary plans for scientific investigations and for the accommodation of a plasma physics facility attached to the Space Station are outlined. These preliminary experiment concepts use the space environment around the Space Station as an unconfined plasma laboratory. In solar physics, the initial instrument complement and associated accommodation requirements of the Advanced Solar Observatory are described. The planned evolutionary development of this observatory is outlined, making use of the Space Station capabilities for servicing and instrument reconfiguration.

  20. Professional Development Training. ACTWU Insurance Department.

    ERIC Educational Resources Information Center

    Martin, Sabrina Budasi

    This curriculum guide provides materials for a 10-week professional development training course. A course outline and list of topics is followed by the plans for the 10 lessons. Components of these lesson plans include topics; objectives; materials needed; lesson outline with activities and discussion; and student handouts. Lesson topics are as…

  1. Basic Electricity in Agricultural Mechanics.

    ERIC Educational Resources Information Center

    Montana State Univ., Bozeman. Dept. of Agricultural and Industrial Education.

    This unit of instruction on electricity has been designed especially for teachers to use with freshmen and sophomore vocational agricultural students in Montana. It consists of an outline of the unit and eight lesson plans. The unit outline lists the following components: situation, aims and goals, lesson plans, student activities, teacher…

  2. Space station WP-04 power system preliminary analysis and design document, volume 3

    NASA Technical Reports Server (NTRS)

    1986-01-01

    Rocketdyne plans to generate a system level specification for the Space Station Electric Power System (EPS) in order to facilitate the usage, accountability, and tracking of overall system level requirements. The origins and status of the verification planning effort are traced and an overview of the Space Station program interactions are provided. The work package level interfaces between the EPS and the other Space Station work packages are outlined. A trade study was performed to determine the peaking split between PV and SD, and specifically to compare the inherent total peaking capability with proportionally shared peaking. In order to determine EPS cost drivers for the previous submittal of DRO2, the life cycle cost (LCC) model was run to identify the more significant costs and the factors contributing to them.

  3. The community development workshop, appendix B.

    NASA Technical Reports Server (NTRS)

    Brill, R.; Gastro, E.; Pennington, A. J.

    1973-01-01

    The Community Development Workshop is the name given to a collection of techniques designed to implement participation in the planning process. It is an electric approach, making use of current work in the psychology of groups, mathematical modeling and systems analysis, simulation gaming, and other techniques. An outline is presented for a session of the workshop which indicates some of the psychological techniques employed, i.e. confrontation, synectics, and encounter micro-labs.

  4. Noncombatant Evacuation Operations (NEO) Decision-Making Process Effects on Efficiency

    DTIC Science & Technology

    2012-02-15

    the eastern coast of Japan. On 12 March, the Fukushima Daiichi nuclear power plant experienced explosions and fires within four reactors.51 Over... awareness , and understanding the mission objectives.43 The following outlines recent NEO successes and failures. First, a strategic look at the evacuation... Daiichi nuclear power plant. Over the next 30 days, the JTF and embassy worked intensely to develop a comprehensive plan overcoming many of the

  5. Acoustics Discipline Overview

    NASA Technical Reports Server (NTRS)

    Envia, Edmane; Thomas, Russell

    2007-01-01

    As part of the Fundamental Aeronautics Program Annual Review, a summary of the progress made in 2007 in acoustics research under the Subsonic Fixed Wing project is given. The presentation describes highlights from in-house and external activities including partnerships and NRA-funded research with industry and academia. Brief progress reports from all acoustics Phase 1 NRAs are also included as are outlines of the planned activities for 2008 and all Phase 2 NRAs. N+1 and N+2 technology paths outlined for Subsonic Fixed Wing noise targets. NRA Round 1 progressing with focus on prediction method advancement. NRA Round 2 initiating work focused on N+2 technology, prediction methods, and validation. Excellent partnerships in progress supporting N+1 technology targets and providing key data sets.

  6. Effects of Electronic Outlining on Students' Argumentative Writing Performance

    ERIC Educational Resources Information Center

    de Smet, M. J. R.; Broekkamp, H.; Brand-Gruwel, S.; Kirschner, P. A.

    2011-01-01

    This study examined the effect of electronic outlining on the quality of students' writing products and how outlining affects perceived mental effort during the writing task. Additionally, it was studied how students appropriate and appreciate an outline tool and whether they need explicit instruction in order to engage in planning. To answer…

  7. NASA Satellite Laser Ranging Network

    NASA Technical Reports Server (NTRS)

    Carter, David L.

    2004-01-01

    I will be participating in the International Workshop on Laser Ranging. I will be presenting to the International Laser Ranging Service (ILRS) general body meeting on the recent accomplishments and status of the NASA Satellite Laser Ranging (SLR) Network. The recent accomplishments and NASA's future plans will be outlined and the benefits to the scientific community will be addressed. I am member of the ILRS governing board, the Missions working group, and the Networks & Engineering working group. I am the chairman of the Missions Working and will be hosting a meeting during the week of the workshop. I will also represent the NASA SLR program at the ILRS governing board and other working group meetings.

  8. Wilderness fire management planning guide

    Treesearch

    William C. Fischer

    1984-01-01

    Outlines a procedure for fire management planning for parks; wilderness areas; and other wild, natural, or essentially undeveloped areas. Discusses background and philosophy of wilderness fire management, planning concepts, planning elements, and planning methods.

  9. Summary of the NASA/MSFC FY-79 Severe Storm and Local Weather research review. [cloud physics, atmospheric electricity, and mesoscale/storm dynamics reserach

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Significant acomplishments, current focus of work, plans for FY-80, and recommendations for new research are outlined for 36 research projects proposed for technical monitoring by the Atmospheric Sciences Division at Marshall Space Flight Center. Topics of the investigations, which were reviewed at a two-day meeting, relate to cloud physics, atmospheric electricity, and mesoscale/storm dynamics.

  10. U.S. Army Medical Materiel Development Activity, 1987 Annual Report

    DTIC Science & Technology

    1988-05-06

    Argentina to determine efficacy of the Candid #1 vaccine in both immune and nonimmune populations. 12 %0 0 Shigella Vaccines are oral products containing...in Cebus monkeys at the University of Lowell, MA. Working groups were convened to outline clinical testing of the TAP and to finalize the draft...measure exposure rates. Data collected from these studies will be used to plan field trials for vaccines that have been developed including Shigella

  11. Citizenship: A Curriculum Guide. Grade Nine.

    ERIC Educational Resources Information Center

    Indiana State Dept. of Public Instruction, Indianapolis.

    This guide is designed to be useful to teachers as they outline courses and daily lesson plans. No attempt has been made to plan in detail for a teacher, however, content outlines are thorough. An effort has been made to acquaint the teacher with the formulation and use of generalizations as an aid to teaching pupils to think; critically suggested…

  12. Production Systems. Laboratory Activities.

    ERIC Educational Resources Information Center

    Gallaway, Ann, Ed.

    This production systems guide provides teachers with learning activities for secondary students. Introductory materials include an instructional planning outline and worksheet, an outline of essential elements, domains and objectives, a course description, and a content outline. The guide contains 30 modules on the following topics: production…

  13. Communication Systems. Laboratory Activities.

    ERIC Educational Resources Information Center

    Sutherland, Barbara, Ed.

    This communication systems guide provides teachers with learning activities for secondary students. Introductory materials include an instructional planning outline and worksheet, an outline of essential elements, a list of objectives, a course description, and a content outline. The guide contains 32 modules on the following topics: story…

  14. Space Transportation Propulsion Systems

    NASA Technical Reports Server (NTRS)

    Liou, Meng-Sing; Stewart, Mark E.; Suresh, Ambady; Owen, A. Karl

    2001-01-01

    This report outlines the Space Transportation Propulsion Systems for the NPSS (Numerical Propulsion System Simulation) program. Topics include: 1) a review of Engine/Inlet Coupling Work; 2) Background/Organization of Space Transportation Initiative; 3) Synergy between High Performance Computing and Communications Program (HPCCP) and Advanced Space Transportation Program (ASTP); 4) Status of Space Transportation Effort, including planned deliverables for FY01-FY06, FY00 accomplishments (HPCCP Funded) and FY01 Major Milestones (HPCCP and ASTP); and 5) a review current technical efforts, including a review of the Rocket-Based Combined-Cycle (RBCC), Scope of Work, RBCC Concept Aerodynamic Analysis and RBCC Concept Multidisciplinary Analysis.

  15. Advanced Planning and Scheduling Initiative- MrSpock Aims for Xmas

    NASA Astrophysics Data System (ADS)

    Steel, R.; Niezette, M.; Cesta, A.; Fratini, S.; Oddi, A.; Cortellessa, G.; Rasconi, R.; Verfaillie, G.; Pralet, C.; Lavagna, M.; Brambilla, A.; Castellini, F.; Donati, A.; Policella, N.

    2009-09-01

    This paper will outline the framework and tools developed under the Advanced Planning and Schedule Initiative (APSI) study performed by VEGA for the European Space Agency in collaboration with three academic institutions, ISTC-CNR, ONERA, and Politecnico di Milano. We will start by illustrating the background history to APSI and why it was needed, giving a brief summary of all the partners within the project and the roles they played within it. We will then take a closer look at what the APSI study actually consisted of, showing the techniques that were used and illustrating the framework that was developed within the scope of the project. This will be followed by an elaboration on the three demonstration test scenarios that have been developed as part of the project to validated the framework and demonstrate in an operational environment its applicability, illustrating the re-use and synergies between the three cases along the way. We will finally conclude with a brief summary and outline future directions to be further investigated and expanded on within the context of the work performed within the project.

  16. Electricity/Electronics Systems. Laboratory Activities.

    ERIC Educational Resources Information Center

    Sutherland, Barbara, Ed.

    This electricity/electronics guide provides teachers with learning activities for secondary students. Introductory materials include an instructional planning outline and worksheet, an outline of essential elements, a list of objectives, a course description, and a content outline. The guide contains 35 modules on the following topics: electrical…

  17. Rehabilitation in Madagascar: Challenges in implementing the World Health Organization Disability Action Plan.

    PubMed

    Khan, Fary; Amatya, Bhasker; Mannan, Hasheem; Burkle, Frederick M; Galea, Mary P

    2015-09-01

    To provide an update on rehabilitation in Madagascar by using local knowledge to outline the potential barriers and facilitators for implementation of the World Health Organization (WHO) Disability Action Plan (DAP). A 14-day extensive workshop programme (September-October 2014) was held at the University Hospital Antananarivo and Antsirabe, with the Department of Health Madagascar, by rehabilitation staff from Royal Melbourne Hospital, Australia. Attendees were rehabilitation professionals (n=29) from 3 main rehabilitation facilities in Madagascar, who identified various challenges faced in service provision, education and attitudes/approaches to people with disabilities. Their responses and suggested barriers/facilitators were recorded following consensus agreement, using objectives listed in the DAP. The barriers and facilitators outlined by participants in implementing the DAP objectives include: engagement of health professionals and institutions using a multi-sectoral approach, new partnerships, strategic collaboration, provision of technical assistance, future policy directions, and research and development. Other challenges for many basic policies included: access to rehabilitation services, geographical coverage, shortage of skilled work-force, limited info-technology systems; lack of care-models and facility/staff accreditation standards; limited health services infrastructure and "disconnect" between acute and community-based rehabilitation. The DAP summary actions were useful planning tools to improve access, strengthen rehabilitation services and community-based rehabilitation, and collate data for outcome research.

  18. Multicentre analysis of treatment planning information: technical requirements, possible applications and a proposal.

    PubMed

    Ebert, M A; Blight, J; Price, S; Haworth, A; Hamilton, C; Cornes, D; Joseph, D J

    2004-09-01

    Digital data from 3-D treatment planning computers is generally used for patient planning and then never considered again. However, such data contains enormous quantities of information regarding patient geometries, tissue outlining, treatment approaches and dose distributions. Were such data accessible from planning systems from multiple manufacturers, there would be substantial opportunities for undertaking quality assurance of radiotherapy clinical trials, prospective assessment of trial outcomes and basic treatment planning research and development. The technicalities of data exchange between planning systems are outlined, and previous attempts at producing systems capable of viewing and/or manipulating imaging and radiotherapy digital data reviewed. Development of a software system for enhancing the quality of Australasian clinical trials is proposed.

  19. Air Force research in human sensory feedback for telepresence

    NASA Technical Reports Server (NTRS)

    Julian, Ronald G.

    1993-01-01

    Telepresence operations require high quality information transfer between the human master and the remotely located slave. Present Air Force research focuses on the human aspects of the information needed to complete the control/feedback loop. Work in three key areas of human sensory feedback for manipulation of objects are described. Specific projects in each key area are outlined, including research tools (hardware), planned research, and test results. Nonmanipulative feedback technologies are mentioned to complete the advanced teleoperation discussions.

  20. Basic research on radiant burners. Semi-annual report, through July 1991

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sullivan, J.D.

    1991-10-01

    Basic performance characteristics of radiant burners are explored in the broad-based study combining theoretical modeling and experimental validation of predictions. The work included fabrication of catalyzed substrates and fibers; incorporation of the catalysts into burners; testing of catalysts; and investigation of new catalyst sources. The progress of the study is detailed and further plans are outlined. A report on the preparation of palladium catalysts by Andre Blaise Kooh is included in the appendix.

  1. Implant retention systems for implant-retained overdentures.

    PubMed

    Laverty, D P; Green, D; Marrison, D; Addy, L; Thomas, M B M

    2017-03-10

    Implant retained overdentures are being increasingly utilised in both general and specialist practice to rehabilitate patients with missing teeth, particularly those that are edentate. This article aims to inform the reader of a variety of retention systems that are available to retain an implant overdenture and to understand how these systems work, their advantages and disadvantages and to outline some of the clinical and treatment planning considerations involved in selecting the most appropriate retention system for patients.

  2. Care plans and care planning in long-term conditions: a conceptual model.

    PubMed

    Burt, Jenni; Rick, Jo; Blakeman, Thomas; Protheroe, Joanne; Roland, Martin; Bower, Pete

    2014-10-01

    The prevalence and impact of long-term conditions continues to rise. Care planning for people with long-term conditions has been a policy priority for chronic disease management in a number of health-care systems. However, patients and providers appear unclear about the formulation and implementation of care planning. Further work in this area is therefore required to inform the development, implementation and evaluation of future care planning initiatives. We distinguish between 'care planning' (the process by which health-care professionals and patients discuss, agree and review an action plan to achieve the goals or behaviour change of most relevance and concern to the patient) and a 'care plan' (a written document recording the outcome of a care planning process). We propose a typology of care planning and care plans with three core dimensions: perspective (patient or professional), scope (a focus on goals or on behaviours) and networks (confined to the professional-patient dyad or extending to the entire care network). In addition, we draw on psychological models of mediation and moderation to outline potential mechanisms through which care planning and care plans may lead to improved outcomes for both patients and the wider health-care system. The proposed typology of care planning and care plans offered here, along with the model of the process by which care planning may influence outcomes, provide a useful framework for future policy developments and evaluations. Empirical work is required to explore the degree to which current care planning approaches and care plans can be described according to these dimensions, and the factors that determine which types of patients and professionals use which type of care plans.

  3. Executive Summary of the 1999 External Environmental Scan and the Internal Environmental Scan Report Card: Key Issues for Planning.

    ERIC Educational Resources Information Center

    Beachler, Judith

    This document is the second in a series of summary reports outlining Key Issues for Planning useful to staff throughout the Los Rios Community College District (CA) for the 1999-2000 academic year and beyond. The 1999 Environmental Scan of Greater Sacramento provides a comprehensive look at the external environment. It outlines changes in the…

  4. Comet rendezvous mission design using Solar Electric Propulsion

    NASA Technical Reports Server (NTRS)

    Sackett, L. L.; Hastrup, R. C.; Yen, C.-W. L.; Wood, L. J.

    1979-01-01

    A dual comet (Halley Flyby/Tempel 2 Rendezvous) mission, which is planned to be the first to use the Solar Electric Propulsion System (SEPS), is to be launched in 1985. The purpose of this paper is to describe how the mission design attempts to maximize science return while working within spacecraft and other constraints. Science requirements and desires are outlined and specific instruments are considered. Emphasis is on the strategy for operations in the vicinity of Tempel 2, for which a representative profile is described. The mission is planned to extend about one year past initial rendezvous. Because of the large uncertainty in the comet environment the Tempel 2 operations strategy must be highly adaptive.

  5. Care plans and care planning in long term conditions: a conceptual model

    PubMed Central

    Burt, J; Rick, J; Blakeman, T; Protheroe, J; Roland, M; Bower, P

    2013-01-01

    The prevalence and impact of long term conditions continues to rise. Care planning for people with long term conditions has been a policy priority for chronic disease management in a number of health care systems. However, patients and providers appear unclear about the formulation and implementation of care planning. Further work in this area is therefore required to inform the development, implementation and evaluation of future care planning initiatives. We distinguish between ‘care planning’ (the process by which health care professionals and patients discuss, agree and review an action plan to achieve the goals or behaviour change of most relevance and concern to the patient) and a ‘care plan’ (a written document recording the outcome of a care planning process). We propose a typology of care planning and care plans with three core dimensions: perspective (patient or professional), scope (a focus on goals or on behaviours) and networks (confined to the professional-patient dyad or extending to the entire care network). In addition, we draw on psychological models of mediation and moderation to outline potential mechanisms through which care planning and care plans may lead to improved outcomes for both patients and the wider health care system. The proposed typology of care planning and care plans offered here, along with the model of the process by which care planning may influence outcomes, provide a useful framework for future policy developments and evaluations. Empirical work is required to explore the degree to which current care planning approaches and care plans can be described according to these dimensions, and the factors that determine which types of patients and professionals use which type of care plans. PMID:23883621

  6. An After School Education Program on the Tohono O'odham Nation

    NASA Astrophysics Data System (ADS)

    Sparks, R. T.; Garmany, K.; Siquieros, J. M.; Austin, C. L.; Pompea, S. M.; Walker, C. E.

    2013-04-01

    The Education and Public Outreach Group (EPO) group of the National Optical Astronomy Observatory has started a partnership with Indian Oasis Baboquivari Unified School District (IOBUSD) on the Tohono O'odham Nation to participate in after school science education programs. IOBUSD has started an after school program for K-5 students as part of their state mandated school improvement program. The first semester has approximately 50 students in K-5 participating in the after school program from Monday through Thursday. Several organizations are working with IOBUSD to provide after school educational programs focusing on a variety of topics including study skills, art, nutrition, bullying, study skills and science. NOAO has been working primarily with the fourth and fifth grade students during the spring of 2012 once a week providing science programs in optics, dark skies and astronomy. We are currently planning to continue this partnership in the fall of 2012 when the school district is planning to invite more students to join the program. We will discuss many the challenges of working with a school district in a remote location as well as the activities we have been using with the students. We will also outline plans for future directions in the program.

  7. An Evaluation and Redesign of the Conflict Prediction and Trial Planning Planview Graphical User Interface

    NASA Technical Reports Server (NTRS)

    Laudeman, Irene V.; Brasil, Connie L.; Stassart, Philippe

    1998-01-01

    The Planview Graphical User Interface (PGUI) is the primary display of air traffic for the Conflict Prediction and Trial Planning, function of the Center TRACON Automation System. The PGUI displays air traffic information that assists the user in making decisions related to conflict detection, conflict resolution, and traffic flow management. The intent of this document is to outline the human factors issues related to the design of the conflict prediction and trial planning portions of the PGUI, document all human factors related design changes made to the PGUI from December 1996 to September 1997, and outline future plans for the ongoing PGUI design.

  8. Don't fight the site: three geomorphic considerations in catchment-scale river rehabilitation planning.

    PubMed

    Brierley, Gary; Fryirs, Kirstie

    2009-06-01

    Three geomorphic considerations that underpin the design and implementation of realistic and strategic river conservation and rehabilitation programs that work with the nature are outlined. First, the importance of appreciating the inherent diversity of river forms and processes is discussed. Second, river dynamics are appraised, framing the contemporary behavioral regime of a reach in relation to system evolution to explain changes to river character and behavior over time. Third, the trajectory of a reach is framed in relation to downstream patterns of river types, analyzing landscape connectivity at the catchment scale to interpret geomorphic river recovery potential. The application of these principles is demonstrated using extensive catchment-scale analyses of geomorphic river responses to human disturbance in the Bega and Upper Hunter catchments in southeastern Australia. Differing implications for reach- and catchment-scale rehabilitation planning prompt the imperative that management practices work with nature rather than strive to 'fight the site.'

  9. Plan Execution Interchange Language (PLEXIL)

    NASA Technical Reports Server (NTRS)

    Estlin, Tara; Jonsson, Ari; Pasareanu, Corina; Simmons, Reid; Tso, Kam; Verma, Vandi

    2006-01-01

    Plan execution is a cornerstone of spacecraft operations, irrespective of whether the plans to be executed are generated on board the spacecraft or on the ground. Plan execution frameworks vary greatly, due to both different capabilities of the execution systems, and relations to associated decision-making frameworks. The latter dependency has made the reuse of execution and planning frameworks more difficult, and has all but precluded information sharing between different execution and decision-making systems. As a step in the direction of addressing some of these issues, a general plan execution language, called the Plan Execution Interchange Language (PLEXIL), is being developed. PLEXIL is capable of expressing concepts used by many high-level automated planners and hence provides an interface to multiple planners. PLEXIL includes a domain description that specifies command types, expansions, constraints, etc., as well as feedback to the higher-level decision-making capabilities. This document describes the grammar and semantics of PLEXIL. It includes a graphical depiction of this grammar and illustrative rover scenarios. It also outlines ongoing work on implementing a universal execution system, based on PLEXIL, using state-of-the-art rover functional interfaces and planners as test cases.

  10. Labor of love. A model for planning human resource needs.

    PubMed

    Brady, F J

    1989-01-01

    Typically, the annual budgeting process is the hospital's only attempt to forecast human resource requirements. In times of rapid change, this traditional ad hoc approach is incapable of satisfying either the Catholic hospital's ethical obligations as an employer or its responsibilities to provide healthcare to the poor and suffering. Assumptions about future activity, including volume projections on admissions, patient days, and other services, influence the budgeting process to a large degree. Because the amount of work to be done and the number of employees required to do it are related, changes in demand for service immediately and directly affect staffing requirements. A hospital cannot achieve ethical human resource management or provide high-quality healthcare if inadequate planning forces management into a cycle of crisis-coping--reacting to this year's nursing shortage with a major recruiting effort and next year's financial crunch with a traumatic reduction in force. The human resource planning approach outlined here helps the hospital meet legitimate business needs while satisfying its ethical obligations. The model has four phases and covers a charge to the planning committee; committee appointments; announcements; the establishment of ground rules, focus, and task forces; and the work of each task force.

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gillespie, B.M.; Stromatt, R.W.; Ross, G.A.

    This data package contains the results obtained by Pacific Northwest Laboratory (PNL) staff in the characterization of samples for the 101-SY Hydrogen Safety Project. The samples were submitted for analysis by Westinghouse Hanford Company (WHC) under the Technical Project Plan (TPP) 17667 and the Quality Assurance Plan MCS-027. They came from a core taken during Window C'' after the May 1991 gas release event. The analytical procedures required for analysis were defined in the Test Instructions (TI) prepared by the PNL 101-SY Analytical Chemistry Laboratory (ACL) Project Management Office in accordance with the TPP and the QA Plan. The requestedmore » analysis for these samples was volatile organic analysis. The quality control (QC) requirements for each sample are defined in the Test Instructions for each sample. The QC requirements outlined in the procedures and requested in the WHC statement of work were followed.« less

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gillespie, B.M.; Stromatt, R.W.; Ross, G.A.

    This data package contains the results obtained by Pacific Northwest Laboratory (PNL) staff in the characterization of samples for the 101-SY Hydrogen Safety Project. The samples were submitted for analysis by Westinghouse Hanford Company (WHC) under the Technical Project Plan (TPP) 17667 and the Quality Assurance Plan MCS-027. They came from a core taken during Window ``C`` after the May 1991 gas release event. The analytical procedures required for analysis were defined in the Test Instructions (TI) prepared by the PNL 101-SY Analytical Chemistry Laboratory (ACL) Project Management Office in accordance with the TPP and the QA Plan. The requestedmore » analysis for these samples was volatile organic analysis. The quality control (QC) requirements for each sample are defined in the Test Instructions for each sample. The QC requirements outlined in the procedures and requested in the WHC statement of work were followed.« less

  13. [Space for the new. Archive - library - study center].

    PubMed

    Weber, Danny

    2014-01-01

    This article features a short outline of both the architectural history and the inventories of Leopoldina's archive and library. Moreover, the article presents the construction plans that will--when implemented in the near future--generate and provide outstanding working facilities in the form of a building ensemble consisting of an archive, library and study center. The future infrastructure of these Leopoldina buildings, located in the area of Emil-Abderhalden-/August-Bebel-Strasse, will sustainably foster and support the establishment of research projects at the Leopoldina Study Center.

  14. A two-level structure for advanced space power system automation

    NASA Technical Reports Server (NTRS)

    Loparo, Kenneth A.; Chankong, Vira

    1990-01-01

    The tasks to be carried out during the three-year project period are: (1) performing extensive simulation using existing mathematical models to build a specific knowledge base of the operating characteristics of space power systems; (2) carrying out the necessary basic research on hierarchical control structures, real-time quantitative algorithms, and decision-theoretic procedures; (3) developing a two-level automation scheme for fault detection and diagnosis, maintenance and restoration scheduling, and load management; and (4) testing and demonstration. The outlines of the proposed system structure that served as a master plan for this project, work accomplished, concluding remarks, and ideas for future work are also addressed.

  15. Measurement of breast volume using body scan technology(computer-aided anthropometry).

    PubMed

    Veitch, Daisy; Burford, Karen; Dench, Phil; Dean, Nicola; Griffin, Philip

    2012-01-01

    Assessment of breast volume is an important tool for preoperative planning in various breast surgeries and other applications, such as bra development. Accurate assessment can improve the consistency and quality of surgery outcomes. This study outlines a non-invasive method to measure breast volume using a whole body 3D laser surface anatomy scanner, the Cyberware WBX. It expands on a previous publication where this method was validated against patients undergoing mastectomy. It specifically outlines and expands the computer-aided anthropometric (CAA) method for extracting breast volumes in a non-invasive way from patients enrolled in a breast reduction study at Flinders Medical Centre, South Australia. This step-by-step description allows others to replicate this work and provides an additional tool to assist them in their own clinical practice and development of designs.

  16. Interim Draft: Biological Sampling and Analysis Plan Outline ...

    EPA Pesticide Factsheets

    Standard Operation Procedures This interim sampling and analysis plan (SAP) outline was developed specifically as an outline of the output that will be generated by a developing on-line tool called the MicroSAP. The goal of the MicroSAP tool is to assist users with development of SAPs needed for site characterization, verification sampling, and post decontamination sampling stages of biological sampling and analysis activities in which the EPA would be responsible for conducting sampling. These activities could include sampling and analysis for a biological contamination incident, a research study, or an exercise. The development of this SAP outline did not consider the initial response of an incident, as it is assumed that the initial response would have been previously completed by another agency during the response, or the clearance phase, as it is assumed that separate committee would be established to make decisions regarding clearing a site. This outline also includes considerations for capturing the associated data quality objectives in the SAP.

  17. A Set of Planning Tools for School Leaders & Teams: Differentiated Planning.

    ERIC Educational Resources Information Center

    Miles, Bruce H.

    This presentation outline with overheads demonstrates differentiated planning, a system with four separate planning methods designed to reduce confusion and increase staff commitment to planning efforts. Differentiated planning involves: (1) prioritization (used for single question issues, multiple question issues, and as a follow-up to the…

  18. Career Planning Workshop offers advice on landing a job

    NASA Astrophysics Data System (ADS)

    Fiske, Peter S.

    As part of a continuing program on career planning and job hunting skills for geoscientists, AGU sponsored a career workshop at the Fall 1994 meeting in San Francisco. Over 100 attended the 2-hour seminar led by Peter Fiske, a post-doc at Lawrence Livermore National Laboratory, and Al Levin, assistant director of graduate counseling and programs at Stanford University's Career Planning and Placement Center. The purpose of the seminar was to help Ph.D.s identify the transferable skills they possess and to outline the basic steps in making the often difficult transition to a new career outside of research science. According to Fiske and Levin, scientists tend to start their career change by searching for specific jobs and organizations they think might be a good match for their technical training and tend to assume that a technical position is the only good match for them. In fact, research-trained scientists possess a number of transferable skills that are valued in a wide variety of work environments, such as good communication, organizational, and team work skills, and independence.

  19. Distribution of a Generic Mission Planning and Scheduling Toolkit for Astronomical Spacecraft

    NASA Technical Reports Server (NTRS)

    Kleiner, Steven C.

    1996-01-01

    Work is progressing as outlined in the proposal for this contract. A working planning and scheduling system has been documented and packaged and made available to the WIRE Small Explorer group at JPL, the FUSE group at JHU, the NASA/GSFC Laboratory for Astronomy and Solar Physics and the Advanced Planning and Scheduling Branch at STScI. The package is running successfully on the WIRE computer system. It is expected that the WIRE will reuse significant portions of the SWAS code in its system. This scheduling system itself was tested successfully against the spacecraft hardware in December 1995. A fully automatic scheduling module has been developed and is being added to the toolkit. In order to maximize reuse, the code is being reorganized during the current build into object-oriented class libraries. A paper describing the toolkit has been written and is included in the software distribution. We have experienced interference between the export and production versions of the toolkit. We will be requesting permission to reprogram funds in order to purchase a standalone PC onto which to offload the export version.

  20. Mutual Contextualization in Tripartite Graphs of Folksonomies

    NASA Astrophysics Data System (ADS)

    Yeung, Ching-Man Au; Gibbins, Nicholas; Shadbolt, Nigel

    The use of tags to describe Web resources in a collaborative manner has experienced rising popularity among Web users in recent years. The product of such activity is given the name folksonomy, which can be considered as a scheme of organizing information in the users' own way. This research work attempts to analyze tripartite graphs - graphs involving users, tags and resources - of folksonomies and discuss how these elements acquire their semantics through their associations with other elements, a process we call mutual contextualization. By studying such process, we try to identify solutions to problems such as tag disambiguation, retrieving documents of similar topics and discovering communities of users. This paper describes the basis of the research work, mentions work done so far and outlines future plans.

  1. Dynamics and statics of nonaxisymmetric liquid bridges

    NASA Technical Reports Server (NTRS)

    Alexander, J. Iwan D.; Resnick, Andy; Zhang, Yiqiang; Fedoseyev, A.

    1994-01-01

    We finished the construction of the experimental apparatus and the design and testing of some of the visualization and data acquisition techniques. Experimental work focused on three areas: force measurements, loss of stability to nonaxisymmetric bridges, and vibration behavior. The experimental work is summarized in section 2. Selected results from our force measurement experiments are outlined in section 3. In addition we worked on the theory of the dynamic stability of axisymmetric bridges and undertook numerical simulation of the effects of inclined gravity vectors on the minimum volume stability limit for static bridges. The results and status of our theoretical work and numerical simulation are described in section 4. Papers published and in preparation, conference presentations, etc., are described in section 5. Work planned for the third year is discussed in section 6. References cited in the report are listed in section 7.

  2. 30 CFR 49.9 - Mine emergency notification plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... TRAINING MINE RESCUE TEAMS § 49.9 Mine emergency notification plan. (a) Each underground mine shall have a mine rescue notification plan outlining the procedures to follow in notifying the mine rescue teams...

  3. 30 CFR 49.9 - Mine emergency notification plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... TRAINING MINE RESCUE TEAMS § 49.9 Mine emergency notification plan. (a) Each underground mine shall have a mine rescue notification plan outlining the procedures to follow in notifying the mine rescue teams...

  4. Federal, provincial and territorial public health response plan for biological events.

    PubMed

    McNeill, R; Topping, J

    2018-01-04

    The Federal/Provincial/Territorial (FPT) Public Health Response Plan for Biological Events was developed for the Public Health Network Council (PHNC). This plan outlines how the national response to public health events caused by biological agents will be conducted and coordinated, with a focus on implementation of responses led by senior-level FPT public health decision-makers. The plan was developed by an expert task group and was approved by PHNC in October, 2017. The plan describes roles, responsibilities and authorities of FPT governments for public health and emergency management, a concept of operations outlining four scalable response levels and a governance structure that aims to facilitate an efficient, timely, evidence-informed and consistent approach across jurisdictions. Improving effective engagement amongst public health, health care delivery and health emergency management authorities is a key objective of the plan.

  5. Federal, provincial and territorial public health response plan for biological events

    PubMed Central

    McNeill, R; Topping, J

    2018-01-01

    The Federal/Provincial/Territorial (FPT) Public Health Response Plan for Biological Events was developed for the Public Health Network Council (PHNC). This plan outlines how the national response to public health events caused by biological agents will be conducted and coordinated, with a focus on implementation of responses led by senior-level FPT public health decision-makers. The plan was developed by an expert task group and was approved by PHNC in October, 2017. The plan describes roles, responsibilities and authorities of FPT governments for public health and emergency management, a concept of operations outlining four scalable response levels and a governance structure that aims to facilitate an efficient, timely, evidence-informed and consistent approach across jurisdictions. Improving effective engagement amongst public health, health care delivery and health emergency management authorities is a key objective of the plan. PMID:29770090

  6. Testing of Mortar Systems

    DTIC Science & Technology

    2010-03-11

    IEP /TDP) or Independent Assessment Plan (IAP), and the test item and the procedures as outlined in this TOP. The following must also be considered...Command DTIC = Defense Technical Information Center DTP = Detailed Test Plan IAP = Independent Assessment Plan IEP = Independent Evaluation Plan IPT

  7. Review of the FAA 1982 National Airspace System plan

    DOT National Transportation Integrated Search

    1982-08-01

    The National Airspace (NAS) Plan outlines the Federal Aviation Administration's most recent proposals for modernizing the facilities and equipment that make up the air traffic control (ATC) system. This review of the NAS Plan examines the Plan at two...

  8. Planning for Disaster.

    ERIC Educational Resources Information Center

    Lewis, Steven

    1996-01-01

    Disaster recovery planning need not be expensive nor complete to be effective. Systematic planning involves several crucial steps, including outlining the final plan, understanding the nature of a disaster's effects and the stages of disaster recovery, prioritizing appropriately, and learning how to test the plan in a practical way for the…

  9. Challenging the Future - Journey to Excellence. Aeropropulsion strategic plan for the 1990's

    NASA Astrophysics Data System (ADS)

    Over the past several months, the Lewis Aeropropulsion Management Council (AMC) has conducted a critical assessment of its strategic plan. This assessment clearly indicated a need for change, both in the aeropropulsion program emphasis and in the approach to carrying out that program. Customers sent a strong message that the program must improve the timeliness of research and technology products and services and must work more closely with them to develop and transfer new technology. The strategic plan defines AMC's vision for the future and underlying organizational values. It contains a set of broad strategies and actions that point the way toward achieving the goals of customer satisfaction, organizational effectiveness, and programmatic excellence. Those strategies are expected to form the basis for the development of specific tactical plans by Lewis aeropropulsion thrust teams, divisions, and branches. To guide tactical planning of the aeropropulsion program, this strategic plan outlines the agency's strategic directions and long-range aeronautics goals, the aeropropulsion goals and key objectives for achieving them, projections of Lewis aeropropulsion budgets, planned allocations of resources, and the processes that will be used to measure success in carrying out the strategic plan.

  10. Challenging the Future - Journey to Excellence. Aeropropulsion strategic plan for the 1990's

    NASA Technical Reports Server (NTRS)

    1990-01-01

    Over the past several months, the Lewis Aeropropulsion Management Council (AMC) has conducted a critical assessment of its strategic plan. This assessment clearly indicated a need for change, both in the aeropropulsion program emphasis and in the approach to carrying out that program. Customers sent a strong message that the program must improve the timeliness of research and technology products and services and must work more closely with them to develop and transfer new technology. The strategic plan defines AMC's vision for the future and underlying organizational values. It contains a set of broad strategies and actions that point the way toward achieving the goals of customer satisfaction, organizational effectiveness, and programmatic excellence. Those strategies are expected to form the basis for the development of specific tactical plans by Lewis aeropropulsion thrust teams, divisions, and branches. To guide tactical planning of the aeropropulsion program, this strategic plan outlines the agency's strategic directions and long-range aeronautics goals, the aeropropulsion goals and key objectives for achieving them, projections of Lewis aeropropulsion budgets, planned allocations of resources, and the processes that will be used to measure success in carrying out the strategic plan.

  11. Strategic Planning for Higher Education.

    ERIC Educational Resources Information Center

    Kotler, Philip; Murphy, Patrick E.

    1981-01-01

    The framework necessary for achieving a strategic planning posture in higher education is outlined. The most important benefit of strategic planning for higher education decision makers is that it forces them to undertake a more market-oriented and systematic approach to long- range planning. (Author/MLW)

  12. Manual for Preparing Individualized Education Programs.

    ERIC Educational Resources Information Center

    Baylor, Terrill D.

    Presented are guidelines for developing an individualized program and services plan, an individual implementation plan, and daily activity and strategy plans for handicapped students. Instructions are outlined for utilizing forms related to planning and implementation of individualized education programs. Appended are sample forms. (SBH)

  13. Planning for Office Automation.

    ERIC Educational Resources Information Center

    Mick, Colin K.

    1983-01-01

    Outlines a practical approach to planning for office automation termed the "Focused Process Approach" (the "what" phase, "how" phase, "doing" phase) which is a synthesis of the problem-solving and participatory planning approaches. Thirteen references are provided. (EJS)

  14. 20 CFR 416.1226 - What is a plan to achieve self-support (PASS)?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... include a business plan that defines the business, provides a marketing strategy, details financial data, outlines the operational procedures, and describes the management plan. (d) Your progress will be reviewed...

  15. A School Desegregation Plan for East Baton Rouge Parish.

    ERIC Educational Resources Information Center

    Rossell, Christine H.

    This paper outlines an alternative desegregation plan that would replace the one implemented in the East Baton Rouge Parish (Louisiana) School District in 1981. Known as the Incentives Desegregation Plan, the alternative plan was designed to produce interracial contact comparable to the earlier plan, without incurring the attendant costs of…

  16. Designing the Horizons of Your Small Business.

    ERIC Educational Resources Information Center

    Helgemo, Robert R.

    This manual outlines the planning process for developing a feasibility study for a small business. The material is composed of three parts: the planning documents filled out for an imaginary campground; a business plan summarized from the planning documents; and blank planning documents with introductions and instructions. The documents can be…

  17. Cove Area Community Involvement Plan

    EPA Pesticide Factsheets

    This Community Involvement Plan (CIP) outlines opportunities for individual participation and meaningful information sharing regarding EPA’s activities in the Cove Area Abandoned Uranium Mine Region.

  18. A Generalized National Planning Approach for Admission Capacity in Higher Education: A Nonlinear Integer Goal Programming Model with a Novel Differential Evolution Algorithm

    PubMed Central

    El-Qulity, Said Ali; Mohamed, Ali Wagdy

    2016-01-01

    This paper proposes a nonlinear integer goal programming model (NIGPM) for solving the general problem of admission capacity planning in a country as a whole. The work aims to satisfy most of the required key objectives of a country related to the enrollment problem for higher education. The system general outlines are developed along with the solution methodology for application to the time horizon in a given plan. The up-to-date data for Saudi Arabia is used as a case study and a novel evolutionary algorithm based on modified differential evolution (DE) algorithm is used to solve the complexity of the NIGPM generated for different goal priorities. The experimental results presented in this paper show their effectiveness in solving the admission capacity for higher education in terms of final solution quality and robustness. PMID:26819583

  19. A Generalized National Planning Approach for Admission Capacity in Higher Education: A Nonlinear Integer Goal Programming Model with a Novel Differential Evolution Algorithm.

    PubMed

    El-Qulity, Said Ali; Mohamed, Ali Wagdy

    2016-01-01

    This paper proposes a nonlinear integer goal programming model (NIGPM) for solving the general problem of admission capacity planning in a country as a whole. The work aims to satisfy most of the required key objectives of a country related to the enrollment problem for higher education. The system general outlines are developed along with the solution methodology for application to the time horizon in a given plan. The up-to-date data for Saudi Arabia is used as a case study and a novel evolutionary algorithm based on modified differential evolution (DE) algorithm is used to solve the complexity of the NIGPM generated for different goal priorities. The experimental results presented in this paper show their effectiveness in solving the admission capacity for higher education in terms of final solution quality and robustness.

  20. Core components of a comprehensive quality assurance program in anatomic pathology.

    PubMed

    Nakhleh, Raouf E

    2009-11-01

    In this article the core components of a comprehensive quality assurance and improvement plan are outlined. Quality anatomic pathology work comes with focus on accurate, timely, and complete reports. A commitment to continuous quality improvement and a systems approach with a persistent effort helps to achieve this end. Departments should have a quality assurance and improvement plan that includes a risk assessment of real and potential problems facing the laboratory. The plan should also list the individuals responsible for carrying out the program with adequate resources, a defined timetable, and annual assessment for progress and future directions. Quality assurance monitors should address regulatory requirements and be organized by laboratory division (surgical pathology, cytology, etc) as well as 5 segments (preanalytic, analytic, postanalytic phases of the test cycle, turn-around-time, and customer satisfaction). Quality assurance data can also be used to evaluate individual pathologists using multiple parameters with peer group comparison.

  1. Guide to Developing an Environmental Management System - Plan

    EPA Pesticide Factsheets

    This page takes you though the basic steps (Plan, Do, Check, Act) of building an Environmental Management System (EMS) as they are outlined in the 2001 Second Edition of Environmental Management Systems: An Implementation Guide. Plan section.

  2. Summary of a Gas Transport Tracer Test in the Deep Cerros Del Rio Basalts, Mesita del Buey, Los Alamos NM.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stauffer, Philip H.; Rahn, Thomas A.; Ortiz, John Philip

    Here we describe results from a tracer test in the Cerros del Rio basalt beneath Mesita del Buey, Technical Area 54 (TA-54) at Los Alamos National Laboratory (LANL or the Laboratory). This report follows from plans outlined in our previous Tracer Test Work Plan (LANL 2016). These activities were conducted by LANL to further characterize subsurface properties of the Cerros del Rio basalts at Material Disposal Area (MDA) L (Figure 1.1-1). The work presented follows from the “Interim Measures Work Plan for Soil-Vapor Extraction of Volatile Organic Compounds from Material Disposal Area L, Technical Area 54, Revision 1,” submitted tomore » the New Mexico Environment Department (NMED) in September 2014 (LANL 2014). Remediation of the MDA L vapor plume by soil-vapor extraction (SVE) is recommended as part of the final remedy in the “Corrective Measures Evaluation Report for Material Disposal Area L, Solid Waste Management Unit 54-006, at Technical Area 54, Revision 2” to meet a remedial action objective of preventing groundwater from being impacted above a regulatory standard by the transport of volatile organic compounds (VOCs) to groundwater through soil vapor (LANL 2011).« less

  3. 75 FR 68383 - Hearing on Reasonable Contracts or Arrangements for Welfare Benefit Plans Under Section 408(b)(2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-05

    ..., e.g., group health plans, severance plans, vacation plans, apprenticeship and training plans, etc..., accident, disability, death or unemployment, or vacation benefits, apprenticeship or other training... written request to be heard; and (2) An outline of the topics to be discussed, indicating the time...

  4. Strategic planning--the role of the chief executive.

    PubMed

    Daniel, A L

    1992-04-01

    Failure to see strategic planning as a process and ineffective CEO involvement are two reasons for failures in strategic planning. This article outlines the stages in an effective strategic planning process, discusses the appropriate role or roles for the CEO or leader in each stage, and defines the expected results from effective strategic planning.

  5. Community Education: A Community Planning Process Guide.

    ERIC Educational Resources Information Center

    Wiglesworth, Bill, Comp.

    Designed to assist in the planning of community education and services, this booklet offers an argument in support of as well as step-by-step implementation instructions for a 2-day planning process. Following a discussion of the advantages of cooperative planning, the community planning process is outlined. Examined next are the reasons why a…

  6. Alabama Commission on Higher Education 1986 Annual Report.

    ERIC Educational Resources Information Center

    Alabama State Commission on Higher Education, Montgomery.

    The 1986 annual report outlines planning and coordination activities and student financial aid programs. The following planning and coordination activities are considered: statewide planning and facilities planning, a new program approval procedure, approval of off-campus offerings, studies of the state's engineering programs and needs and allied…

  7. Planning for School Emergencies.

    ERIC Educational Resources Information Center

    Della-Giustina, Daniel E.

    This document is designed to provide civil leaders and school administrators with a resource that will enable them to develop comprehensive contingency plans for specific emergency situations. A discussion of disaster and emergency management planning includes an outline of the objectives of emergency planning that were established for this guide.…

  8. Strategic Planning: Looking through the Lens of Foucault.

    ERIC Educational Resources Information Center

    Rusch, Edith A.

    Strategic planning is a rational, private-sector planning model that results in a document outlining the "ideal vision" for the individual, organization, and society. Public schools gained familiarity with strategic planning through the American Association of School Administrators, who sponsor the activity as a combination of rational…

  9. Designing and Implementing Performance-Based Career Ladder Plans.

    ERIC Educational Resources Information Center

    Hawley, Willis D.

    1985-01-01

    Reviews the factors that any teacher motivation plan must incorporate to be effective and outlines 11 principles that should be followed in designing career ladder plans to meet teacher needs, increase teacher competence, and facilitate effective instruction. Warns against potential pitfalls in career ladder plans. (PGD)

  10. Applying principles of self-management to facilitate workers to return to or remain at work with a chronic musculoskeletal condition.

    PubMed

    Johnston, Venerina; Jull, Gwendolen; Sheppard, Dianne M; Ellis, Niki

    2013-08-01

    It is incumbent on health care professionals to support patients with chronic musculoskeletal conditions to manage the impact of the condition on their life. Work is a positive health behaviour for which self-management skills are essential. In this paper, self-management is defined and the role of clinicians in promoting self-management for return to work is outlined with examples and tips on how the clinician can incorporate self-management into practice. The clinician is ideally placed to assist individuals with chronic musculoskeletal conditions manage to remain at work or return to work. This can be achieved through such activities as the promotion of the core self-management skills of problem-solving, decision making, resource utilisation, developing a cooperative partnership between clinician and patient and making an action plan. Copyright © 2013 Elsevier Ltd. All rights reserved.

  11. Gender issues in the university research environment

    NASA Astrophysics Data System (ADS)

    Alpay, E.; Hari, A.; Kambouri, M.; Ahearn, A. L.

    2010-05-01

    Recruiting and retaining females within science, engineering and technology continues to challenge many European higher education institutions. This study looks at female self-perceptions relating to effective research work and career progression. Focus groups are used to examine the attitudes and experiences of females and a questionnaire is used to explore perceptions in four main skills areas: group work; communication; personal awareness; project planning and management. The study indicates consistent female concerns on issues pertaining to effective female role models, negative work-role stereotypes and the work-life balance of an academic career. For all four skills areas, the average confidence scores of the female participants fell below those of males, but these differences were only statistically significant for perceptions on group work and communication skills and prior to an intense skills development course. Based on these findings, a student workshop on gender issues has been developed, an outline of which is presented.

  12. Space Shuttle Aging Elastomers

    NASA Technical Reports Server (NTRS)

    Curtis, Cris E.

    2007-01-01

    The reusable Manned Space Shuttle has been flying into Space and returning to earth for more than 25 years. The Space Shuttle's uses various types of elastomers and they play a vital role in mission success. The Orbiter has been in service well past its design life of 10 years or 100 missions. As part of the aging vehicle assessment one question under evaluation is how the elastomers are performing. This paper will outline a strategic assessment plan, how identified problems were resolved and the integration activities between subsystems and Aging Orbiter Working Group.

  13. Multimission Software Reuse in an Environment of Large Paradigm Shifts

    NASA Technical Reports Server (NTRS)

    Wilson, Robert K.

    1996-01-01

    The ground data systems provided for NASA space mission support are discussed. As space missions expand, the ground systems requirements become more complex. Current ground data systems provide for telemetry, command, and uplink and downlink processing capabilities. The new millennium project (NMP) technology testbed for 21st century NASA missions is discussed. The program demonstrates spacecraft and ground system technologies. The paradigm shift from detailed ground sequencing to a goal oriented planning approach is considered. The work carried out to meet this paradigm for the Deep Space-1 (DS-1) mission is outlined.

  14. Initial test results from a prototype, 20 kW helium charged Stirling engine

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clarke, M.A.; Taylor, D.R.

    An alpha-configuration, helium charged Stirling engine with a predicted output of 20 kW indicated power has been developed by a British consortium of universities and industrial companies. The work performed by the Royal Naval Engineering College has been in computer assisted design and component testing, with future plans for full engine trials during 1984/85. The scope of this paper is to outline the data obtained during motoring trials of the engine block and crankcase assembly, together with details of modifications incorporated in the various components.

  15. NDT standards from the perspective of the Department of Defense

    NASA Astrophysics Data System (ADS)

    Strauss, Bernard

    1992-09-01

    The interaction of the DoD non-Government Society (NGS) bodies in the area of nondestructive testing (NDT) are illustrated. The adoption process for NGS is outlined including the criteria for adoption, what adoption means, and the advantages of DoD/NGS interaction. The tasks of the DoD's Standardization Program Plan for NDT are described along with DoD's efforts on a Joint Army, Navy, Air Force (JANNAF) NDE Subcommittee and on an international standardization group (America, Britain, Canada, and Australia) called the Quadripartite Working Group on Proofing, Inspection, and Quality Assurance.

  16. Information Management System for the California State Water Resources Control Board (SWRCB)

    NASA Technical Reports Server (NTRS)

    Heald, T. C.; Redmann, G. H.

    1973-01-01

    A study was made to establish the requirements for an integrated state-wide information management system for water quality control and water quality rights for the State of California. The data sources and end requirements were analyzed for the data collected and used by the numerous agencies, both State and Federal, as well as the nine Regional Boards under the jurisdiction of the State Board. The report details the data interfaces and outlines the system design. A program plan and statement of work for implementation of the project is included.

  17. CIELO Collaboration Summary Results: International Evaluations of Neutron Reactions on Uranium, Plutonium, Iron, Oxygen and Hydrogen

    DOE PAGES

    Chadwick, M. B.; Capote, R.; Trkov, A.; ...

    2018-03-07

    The CIELO collaboration has studied neutron cross sections on nuclides that significantly impact criticality in nuclear technologies - 235,238U, 239Pu, 56Fe, 16O and 1H - with the aim of improving the accuracy of the data and resolving previous discrepancies in our understanding. This multi-laboratory pilot project, coordinated via the OECD/NEA Working Party on Evaluation Cooperation (WPEC) Subgroup 40 with support also from the IAEA, has motivated experimental and theoretical work and led to suites of new evaluated libraries that accurately reflect measured data and also perform well in integral simulations of criticality. This report summarizes our results on cross sectionsmore » and preliminary work on covariances, and outlines plans for the next phase of this collaboration.« less

  18. CIELO Collaboration Summary Results: International Evaluations of Neutron Reactions on Uranium, Plutonium, Iron, Oxygen and Hydrogen

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chadwick, M. B.; Capote, R.; Trkov, A.

    The CIELO collaboration has studied neutron cross sections on nuclides that significantly impact criticality in nuclear technologies - 235,238U, 239Pu, 56Fe, 16O and 1H - with the aim of improving the accuracy of the data and resolving previous discrepancies in our understanding. This multi-laboratory pilot project, coordinated via the OECD/NEA Working Party on Evaluation Cooperation (WPEC) Subgroup 40 with support also from the IAEA, has motivated experimental and theoretical work and led to suites of new evaluated libraries that accurately reflect measured data and also perform well in integral simulations of criticality. This report summarizes our results on cross sectionsmore » and preliminary work on covariances, and outlines plans for the next phase of this collaboration.« less

  19. Lunar exploration rover program developments

    NASA Technical Reports Server (NTRS)

    Klarer, P. R.

    1994-01-01

    The Robotic All Terrain Lunar Exploration Rover (RATLER) design concept began at Sandia National Laboratories in late 1991 with a series of small, proof-of-principle, working scale models. The models proved the viability of the concept for high mobility through mechanical simplicity, and eventually received internal funding at Sandia National Laboratories for full scale, proof-of-concept prototype development. Whereas the proof-of-principle models demonstrated the mechanical design's capabilities for mobility, the full scale proof-of-concept design currently under development is intended to support field operations for experiments in telerobotics, autonomous robotic operations, telerobotic field geology, and advanced man-machine interface concepts. The development program's current status is described, including an outline of the program's work over the past year, recent accomplishments, and plans for follow-on development work.

  20. SEDIMENTS: A RESERVOIR OF HISTORIC CONTAMINATION OF THE DETROIT RIVER

    EPA Science Inventory

    Presentation to a citizen's environment alliance regarding contamination of the Detroit River. Types and amounts of contaminants were outlined and major pollution sources were identified. Outline for remediation plan was presented. However, before remediation can be done, upstre...

  1. National Institutes of Health Research Plan on Rehabilitation

    PubMed Central

    O’Mara, Ann; Rowland, Julia H.; Greenwell, Thomas N.; Wiggs, Cheri L.; Fleg, Jerome; Joseph, Lyndon; McGowan, Joan; Panagis, James S.; Washabaugh, Charles; Peng, Grace C. Y.; Bray, Rosalina; Cernich, Alison N.; Cruz, Theresa H.; Marden, Sue; Michel, Mary Ellen; Nitkin, Ralph; Quatrano, Louis; Spong, Catherine Y.; Shekim, Lana; Jones, Teresa L. Z.; Juliano-Bult, Denise; Panchinson, David M.; Chen, Daofen; Jakeman, Lyn; Knebel, Ann; Tully, Lois A.; Chan, Leighton; Damiano, Diane; Tian, Biao; McInnes, Pamela; Khalsa, Partap; Reider, Eve; Shurtleff, David; Elwood, William; Ballard, Rachel; Ershow, Abby G.; Begg, Lisa

    2017-01-01

    Abstract One in five Americans experiences disability that affects their daily function because of impairments in mobility, cognitive function, sensory impairment, or communication impairment. The need for rehabilitation strategies to optimize function and reduce disability is a clear priority for research to address this public health challenge. The National Institutes of Health (NIH) recently published a Research Plan on Rehabilitation that provides a set of priorities to guide the field over the next 5 years. The plan was developed with input from multiple Institutes and Centers within the NIH, the National Advisory Board for Medical Rehabilitation Research, and the public. This article provides an overview of the need for this research plan, an outline of its development, and a listing of six priority areas for research. The NIH is committed to working with all stakeholder communities engaged in rehabilitation research to track progress made on these priorities and to work to advance the science of medical rehabilitation. This article is being published almost simultaneously in the following six journals: American Journal of Occupational Therapy, American Journal of Physical Medicine and Rehabilitation, Archives of Physical Medicine and Rehabilitation, Neurorehabilitation and Neural Repair, Physical Therapy, and Rehabilitation Psychology. Citation information is as follows: NIH Medical Rehabilitation Coordinating Committee. Am J Phys Med Rehabil. 2017;97(4):404—407. PMID:28499003

  2. A Report on Administrative Compensation Planning for St. Paul Public School Personnel.

    ERIC Educational Resources Information Center

    Hooker, Clifford P.; Mueller, Van D.

    This report describes and analyzes various devices and techniques that may be utilized in planning local school administrative compensation. The document outlines broad overall goals for compensation planning, describes and evaluates the application of a compensation plan in the St. Paul schools, and proposes alternative strategies for…

  3. A Guide to Program Planning Vol. II.

    ERIC Educational Resources Information Center

    Allen, Earl, Sr.

    This booklet is a simplified guide for program planning and is intended to complement a somewhat lengthier companion booklet on program evaluation. It spells out in outline fashion the basic elements and steps involved in the planning process. Brief sections focus in turn on different phases of the planning process, including problem…

  4. Salem Community College's 1999-2002 Strategic Plan Authoring & Implementation Strategy.

    ERIC Educational Resources Information Center

    Salem Community Coll., Penns Grove, NJ.

    This document outlines the Strategic Planning Initiative (SPI) for New Jersey's Salem Community College. This is the first plan the college has authored in seven years. The report provides a theoretical framework for heterarchical planning, which allows for complexity and interrelations of structural analysis, and lateral decision making. The…

  5. Chromosomes on the move: The educational and neurological advantages of using body movement to teach cellular division

    NASA Astrophysics Data System (ADS)

    Baumwoll, Alma Aron

    As education and neuroscience begin to merge, creating the new field of brain-based education, teachers are working to integrate scientific research into the classroom. While working to improve my own teaching, I developed a lesson plan to teach mitosis and meiosis through movement. My thesis reviews education theory and neuroscience to support using movement as a teaching tool in high-level, subject-based classrooms. I then outline my lesson plan and present my investigations of its effectiveness as demonstrated through short-term memory, long-term memory, and students' personal responses to the class. Two experiments were completed with biology lab sections at Northeastern University between 2009 and 2012; I taught my lesson to experimental groups while control groups learned through video-based lessons. The short-term study showed significant improvement in both the grades and enjoyment of the experimental groups. The long-term, retroactive study yielded no significant data, possibly due to weaknesses in the experimental design.

  6. Creating a Marketing Plan.

    ERIC Educational Resources Information Center

    Sevier, Robert A.

    1989-01-01

    A guide to developing a college marketing plan defines key marketing terms, outlines the development of a plan (including institutional analysis, market research, strategy formation and execution, and program evaluation), and provides a list of important principles with which to operate a program. (MSE)

  7. Integrated Data Base Program: a status report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Notz, K.J.; Klein, J.A.

    1984-06-01

    The Integrated Data Base (IDB) Program provides official Department of Energy (DOE) data on spent fuel and radioactive waste inventories, projections, and characteristics. The accomplishments of FY 1983 are summarized for three broad areas: (1) upgrading and issuing of the annual report on spent fuel and radioactive waste inventories, projections, and characteristics, including ORIGEN2 applications and a quality assurance plan; (2) creation of a summary data file in user-friendly format for use on a personal computer and enhancing user access to program data; and (3) optimizing and documentation of the data handling methodology used by the IDB Program and providingmore » direct support to other DOE programs and sites in data handling. Plans for future work in these three areas are outlined. 23 references, 11 figures.« less

  8. Test Results for Caustic Demand Measurements on Tank 241-AX-101 and Tank 241-AX-103 Archive Samples

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Doll, Stephanie R.; Bolling, Stacie D.

    Caustic demand testing is used to determine the necessary amount of caustic required to neutralize species present in the Hanford tank waste and obtain a target molarity of free hydroxide for tank corrosion control. The presence and quantity of hydroxide-consuming analytes are just as important in determining the caustic demand as is the amount of free hydroxide present. No single data point can accurately predict whether a satisfactory hydroxide level is being met, as it is dependent on multiple factors (e.g., free hydroxide, buffers, amphoteric metal hydroxides, bicarbonate, etc.). This enclosure contains the caustic demand, scanning electron microscopy (SEM), polarizedmore » light microscopy (PLM), and X-ray diffraction (XRD) analysis for the tank 241-AX-101 (AX-101) and 241-AX-103 (AX-103) samples. The work was completed to fulfill a customer request outlined in the test plan, WRPS-1505529, “Test Plan and Procedure for Caustic Demand Testing on Tank 241-AX-101 and Tank 241-AX-103 Archive Samples.” The work results will provide a baseline to support planned retrieval of AX-101 and AX-103.« less

  9. 7 CFR 25.404 - Validation of designation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... maintain a process for ensuring ongoing broad-based participation by community residents consistent with the approved application and planning process outlined in the strategic plan. (1) Continuous... benchmarks, the process it will use for reviewing goals and benchmarks and revising its strategic plan. (2...

  10. Administrator Accountability Plan, 1986-87.

    ERIC Educational Resources Information Center

    Council Bluffs Community School District, IA.

    This summary outline presents performance evaluation procedures of the 1986-87 administrator accountability plan adopted by the Council Bluffs Community Schools, Iowa. Procedures ensure that a cooperative evaluation plan is established, there is continuity between evaluation cycles, guidance and assistance are provided, and due process is…

  11. Planning Staff and Space Capacity Requirements during Wartime.

    PubMed

    Kepner, Elisa B; Spencer, Rachel

    2016-01-01

    Determining staff and space requirements for military medical centers can be challenging. Changing patient populations change the caseload requirements. Deployment and assignment rotations change the experience and education of clinicians and support staff, thereby changing the caseload capacity of a facility. During wartime, planning becomes increasingly more complex. What will the patient mix and caseload volume be by location? What type of clinicians will be available and when? How many beds are needed at each facility to meet caseload demand and match clinician supply? As soon as these factors are known, operations are likely to change and planning factors quickly become inaccurate. Soon, more beds or staff are needed in certain locations to meet caseload demand while other locations retain underutilized staff, waiting for additional caseload fluctuations. This type of complexity challenges the best commanders. As in so many other industries, supply and demand principles apply to military health, but very little is stable about military health capacity planning. Planning analysts build complex statistical forecasting models to predict caseload based on historical patterns. These capacity planning techniques work best in stable repeatable processes where caseload and staffing resources remain constant over a long period of time. Variability must be simplified to predict complex operations. This is counterintuitive to the majority of capacity planners who believe more data drives better answers. When the best predictor of future needs is not historical patterns, traditional capacity planning does not work. Rather, simplified estimation techniques coupled with frequent calibration adjustments to account for environmental changes will create the most accurate and most useful capacity planning and management system. The method presented in this article outlines the capacity planning approach used to actively manage hospital staff and space during Operations Iraqi Freedom and Enduring Freedom.

  12. Planning for Higher Education.

    ERIC Educational Resources Information Center

    Lindstrom, Caj-Gunnar

    1984-01-01

    Decision processes for strategic planning for higher education institutions are outlined using these parameters: institutional goals and power structure, organizational climate, leadership attitudes, specific problem type, and problem-solving conditions and alternatives. (MSE)

  13. Introduction to Soil Fumigant Management Plans

    EPA Pesticide Factsheets

    Soil fumigant pesticide labels require users to prepare a site-specific fumigation management plan (FMP) before the application begins. EPA has developed templates that outline the elements required by the labels.

  14. Community Involvement Plan: Northeast Church Rock and Quivira

    EPA Pesticide Factsheets

    The Community Involvement Plan outlines opportunities for individual participation and meaningful information sharing regarding EPA’s activities at the Northeast Church Rock Mine and Kerr-McGee Quivira Mines.

  15. How is an international public health threat advanced in Canada? The case of antimicrobial resistance.

    PubMed

    Tsegaye, L; Huston, P; Milliken, R; Hanniman, K; Nesbeth, C; Noad, L

    2016-11-03

    On September 21, 2016, the United Nations General Assembly held a high-level meeting on antimicrobial resistance (AMR). Participating political leaders committed to coordinate action across the human and animal health, agriculture and environmental sectors and to work at national, regional and international levels with the public sector, private sector, civil society and all other relevant actors, including the public. The objective of this article is to outline how the Public Health Agency of Canada (PHAC) has been working to address AMR in Canada. PHAC has used a One Health approach and has been working at the federal level with other government departments and nationally with the provinces, territories, professional organizations and other key players to address AMR. To date, the federal response has focused on surveillance, stewardship and innovation across multiple sectors, including human health, animal health, regulatory actions and research. PHAC is currently working with the provinces and territories as well as key experts in the field to develop a pan-Canadian AMR Framework and subsequent action plan that will outline best practices and approaches to AMR across human and animal health. The Framework will build on previous work done by PHAC and the federal/provincial/territorial Pan-Canadian Public Health Network Council, and recognizes the research expertise in Canada, the need to ensure actions are based on evidence, and to combat AMR through infection prevention and control. The three articles in this issue are examples of the foundational work that has been done federally by PHAC, in developing the Canadian AMR Surveillance System (CARSS), and nationally, through task groups of the Public Health Network Council, in identifying where to strengthen human surveillance of AMR and best practices for stewardship in the human health care system. While we remain in an early stage of national, coordinated AMR action, momentum is building to ensure Canada can respond to this global health threat with a One Health approach involving multiple sectors at local, national and international levels that are all well-aligned with the World Health Organization Global Action Plan.

  16. Normal tissue complication probability modelling of tissue fibrosis following breast radiotherapy

    NASA Astrophysics Data System (ADS)

    Alexander, M. A. R.; Brooks, W. A.; Blake, S. W.

    2007-04-01

    Cosmetic late effects of radiotherapy such as tissue fibrosis are increasingly regarded as being of importance. It is generally considered that the complication probability of a radiotherapy plan is dependent on the dose uniformity, and can be reduced by using better compensation to remove dose hotspots. This work aimed to model the effects of improved dose homogeneity on complication probability. The Lyman and relative seriality NTCP models were fitted to clinical fibrosis data for the breast collated from the literature. Breast outlines were obtained from a commercially available Rando phantom using the Osiris system. Multislice breast treatment plans were produced using a variety of compensation methods. Dose-volume histograms (DVHs) obtained for each treatment plan were reduced to simple numerical parameters using the equivalent uniform dose and effective volume DVH reduction methods. These parameters were input into the models to obtain complication probability predictions. The fitted model parameters were consistent with a parallel tissue architecture. Conventional clinical plans generally showed reducing complication probabilities with increasing compensation sophistication. Extremely homogenous plans representing idealized IMRT treatments showed increased complication probabilities compared to conventional planning methods, as a result of increased dose to areas receiving sub-prescription doses using conventional techniques.

  17. DoDEA Seniors' Postsecondary Plans and Scholarships, 2010

    ERIC Educational Resources Information Center

    Embler, Sandra

    2010-01-01

    During their senior year students in the Department of Defense Education Activity (DoDEA) schools develop a postsecondary plan. This plan outlines what students intend to do after graduating from high school; whether they are planning to attend a 4-year college/university, junior/community college, or vocational/technical school; seek employment…

  18. General Guide for Community College System Physical Planning. 2nd Printing.

    ERIC Educational Resources Information Center

    Mogi, Hitoshi

    Part I describes a general outline for producing long range development plans for the Hawaii Community College System. Long-range planning is defined and discussed in terms of basic elements of academic requirements, quality of campus, space requirements, environmental factors, administrative factors, and adjustment factors of the general plans.…

  19. Planning for Future Forms of Education: Towards an Educational and Educational Facilities Planning Model.

    ERIC Educational Resources Information Center

    Leu, Donald J.

    The author provides an overview and conceptualization of the total educational and educational facility planning process. The presentation attempts to provide a simple practical outline for local planners, so they may actively engage in relevant educational facility planning, and a common conceptual base, so the various components of Project…

  20. 75 FR 21341 - Millerton Lake Resource Management Plan/General Plan (RMP/GP), Madera and Fresno Counties, CA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-23

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Millerton Lake Resource Management Plan/General Plan (RMP/GP), Madera and Fresno Counties, CA AGENCY: Bureau of Reclamation, Interior. ACTION: Notice... adoption of the RMP/GP. The Final EIS/EIR outlines the formulation and evaluation of alternatives designed...

  1. [Post-marketing drug safety-risk management plan(RMP)].

    PubMed

    Ezaki, Asami; Hori, Akiko

    2013-03-01

    The Guidance for Risk Management Plan(RMP)was released by the Ministry of Health, Labour and Welfare in April 2012. The RMP consists of safety specifications, pharmacovigilance plans and risk minimization action plans. In this paper, we outline post-marketing drug safety operations in PMDA and the RMP, with examples of some anticancer drugs.

  2. The Risks and Rewards of College/University Prepayment and Savings Plans. Policy Bulletin.

    ERIC Educational Resources Information Center

    Rothschild, Mark

    This bulletin describes types of prepayment and savings plans for financing college education, outlines advantages and disadvantages of these programs, and highlights issues that state and institutional planners and policymakers should consider. A description of existing tuition prepayment plans looks at state plans that typically permit investors…

  3. Statewide Transportation Improvement Program (STIP)

    DOT National Transportation Integrated Search

    1995-02-01

    West Virginia's Statewide Transportation Improvement Program (STIP) is designed to meet the requirements outlined in the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA), and the Statewide Planning; Metropolitan Planning; Rule (23 CFR...

  4. Leading quality through the development of a multi-year corporate quality plan: sharing The Ottawa Hospital experience.

    PubMed

    Hunter, Linda; Myles, Joanne; Worthington, James R; Lebrun, Monique

    2011-01-01

    This article discusses the background and process for developing a multi-year corporate quality plan. The Ottawa Hospital's goal is to be a top 10% performer in quality and patient safety in North America. In order to create long-term measurable and sustainable changes in the quality of patient care, The Ottawa Hospital embarked on the development of a three-year strategic corporate quality plan. This was accomplished by engaging the organization at all levels and defining quality frameworks, aligning with internal and external expectations, prioritizing strategic goals, articulating performance measurements and reporting to stakeholders while maintaining a transparent communication process. The plan was developed through an iterative process that engaged a broad base of health professionals, physicians, support staff, administration and senior management. A literature review of quality frameworks was undertaken, a Quality Plan Working Group was established, 25 key stakeholder interviews were conducted and 48 clinical and support staff consultations were held. The intent was to gather information on current quality initiatives and challenges encountered and to prioritize corporate goals and then create the quality plan. Goals were created and then prioritized through an affinity exercise. Action plans were developed for each goal and included objectives, tasks and activities, performance measures (structure, process and outcome), accountabilities and timelines. This collaborative methodology resulted in the development of a three-year quality plan. Six corporate goals were outlined by the tenets of the quality framework for The Ottawa Hospital: access to care, appropriate care (effective and efficient), safe care and satisfaction with care. Each of the six corporate goals identified objectives and supporting action plans with accountabilities outlining what would be accomplished in years one, two and three. The three-year quality plan was approved by senior management and the board in April 2009. This process has supported The Ottawa Hospital's journey of excellence through the creation of a quality plan that will enable long-term measurable and sustainable changes in the quality of patient care. It also engaged healthcare providers who aim to achieve more measured quality patient care, engaged practitioners through collaboration resulting in both alignment of goals and outcomes and allowed for greater commitment by those responsible for achieving quality goals.

  5. Conference Planning.

    ERIC Educational Resources Information Center

    Carter, Richard

    1982-01-01

    Presents an overview of the management planning technique known as Break Even Analysis and outlines its use as a tool in financial planning for organizations intending to conduct or sponsor a conference, seminar, or workshop. Three figures illustrating Break Even Analysis concepts and a Break Even Analysis worksheet are included. (JL)

  6. Environmental Health Planning Guide. Revised 1968.

    ERIC Educational Resources Information Center

    Public Health Service (DHEW), Rockville, MD.

    This guide to environmental health planning outlines the process and procedures of bringing together certain fundamental data pertaining to various physical aspects of the environment, including data collection, evaluation, usage, and implementation. The components of such planning programs are listed along with study preparation information.…

  7. Biodiversity in School Grounds: Auditing, Monitoring and Managing an Action Plan

    ERIC Educational Resources Information Center

    Mansell, Michelle

    2010-01-01

    The idea of using site biodiversity action plans to introduce biodiversity management initiatives into school grounds is outlined. Selected parts of a case study, involving the use of such an action plan to record, monitor and plan for biodiversity on a university campus, are described and ideas for applying a similar plan to a school setting are…

  8. Recent advances in materials toxicology

    NASA Technical Reports Server (NTRS)

    Russo, D. M.

    1979-01-01

    An overview of the fire toxicology program, its principal objectives and approach, is outlined. The laboratory methods of assessing pyrolysis product toxicity for two experiments are presented. The two experiments are: a comparison of test end points; and an evaluation of operant techniques. A third experiment is outlined for a comparison of full-scale and laboratory toxicity tests, with the purpose of determining animal survivability in full-scale tests. Future research plans are also outlined.

  9. RETAIL ORGANIZATION, A SUGGESTED ADULT DISTRIBUTIVE EDUCATION COURSE OUTLINE.

    ERIC Educational Resources Information Center

    MAURO, RALPH N.; AND OTHERS

    THIS SUGGESTED OUTLINE FOR A COURSE ON RETAIL ORGANIZATION IS PLANNED FOR FIVE 2-HOUR SESSIONS ON (1) EVOLUTION OF RETAIL ORGANIZATIONAL STRUCTURE, (2) ORGANIZATION, INCLUDING CONCEPTS, PRINCIPLES, AND PRACTICES, (3) TYPICAL RETAIL ORGANIZATION PATTERNS, (4) ORGANIZATIONAL AND FUNCTIONAL ANAYSIS, INCLUDING MERCHANDISING, SALES PROMOTION, AND…

  10. The SHARPn Project on Secondary Use of Electronic Medical Record Data: Progress, Plans, and Possibilities

    PubMed Central

    Chute, Christopher G; Pathak, Jyotishman; Savova, Guergana K; Bailey, Kent R; Schor, Marshall I; Hart, Lacey A; Beebe, Calvin E; Huff, Stanley M

    2011-01-01

    SHARPn is a collaboration among 16 academic and industry partners committed to the production and distribution of high-quality software artifacts that support the secondary use of EMR data. Areas of emphasis are data normalization, natural language processing, high-throughput phenotyping, and data quality metrics. Our work avails the industrial scalability afforded by the Unstructured Information Management Architecture (UIMA) from IBM Watson Research labs, the same framework which underpins the Watson Jeopardy demonstration. This descriptive paper outlines our present work and achievements, and presages our trajectory for the remainder of the funding period. The project is one of the four Strategic Health IT Advanced Research Projects (SHARP) projects funded by the Office of the National Coordinator in 2010. PMID:22195076

  11. The SHARPn project on secondary use of Electronic Medical Record data: progress, plans, and possibilities.

    PubMed

    Chute, Christopher G; Pathak, Jyotishman; Savova, Guergana K; Bailey, Kent R; Schor, Marshall I; Hart, Lacey A; Beebe, Calvin E; Huff, Stanley M

    2011-01-01

    SHARPn is a collaboration among 16 academic and industry partners committed to the production and distribution of high-quality software artifacts that support the secondary use of EMR data. Areas of emphasis are data normalization, natural language processing, high-throughput phenotyping, and data quality metrics. Our work avails the industrial scalability afforded by the Unstructured Information Management Architecture (UIMA) from IBM Watson Research labs, the same framework which underpins the Watson Jeopardy demonstration. This descriptive paper outlines our present work and achievements, and presages our trajectory for the remainder of the funding period. The project is one of the four Strategic Health IT Advanced Research Projects (SHARP) projects funded by the Office of the National Coordinator in 2010.

  12. A U.S. Carbon Cycle Science Plan

    NASA Astrophysics Data System (ADS)

    Michalak, Anna M.; Jackson, Rob; Marland, Gregg; Sabine, Christopher

    2009-03-01

    First Meeting of the Carbon Cycle Science Working Group; Washington, D. C., 17-18 November 2008; The report “A U.S. carbon cycle science plan” (J. L. Sarmiento and S. C. Wofsy, U.S. Global Change Res. Program, Washington, D. C., 1999) outlined research priorities and promoted coordinated carbon cycle research across federal agencies for nearly a decade. Building on this framework and subsequent reports (available at http://www.carboncyclescience.gov/docs.php), the Carbon Cycle Science Working Group (CCSWG) was formed in 2008 to develop an updated strategy for the next decade. The recommendations of the CCSWG will go to agency managers who have collective responsibility for setting national carbon cycle science priorities and for sponsoring much of the carbon cycle research in the United States.

  13. Florida State University's Institute for Family Violence Studies.

    PubMed

    Oehme, Karen

    2018-01-01

    This article outlines the role of the Institute for Family Violence Studies (IFVS) within the Florida State University College of Social Work in navigating issues intersecting social work and the law ( http://familyvio.csw.fsu.edu/ ). By developing comprehensive state and national trainings for unique populations and conducting interdisciplinary research, the IFVS promotes public policy that benefits healthy families and decreases family and intimate partner violence. The crucial role of staff and students, the IFVS's collaborative alliances, and funding sources are highlighted. Projects such as the Clearinghouse on Supervised Visitation, the National Prevention Toolkit on Officer-Involved Domestic Violence, Successful Co-Parenting After Divorce, and the LGBTQ Family Life Project are described. Plans for future projects, as well as other new avenues for research, are summarized.

  14. Stage II Remedial Action Plan Deer Lake AOC

    EPA Pesticide Factsheets

    Michigan Department of Environmental Quality reports on actions taken that have resulted in the removal of two beneficial use impairments. Outlines plans to remove remaining BUI and to delist the Area Of Concern.

  15. Louisiana ITS business plan : technical summary.

    DOT National Transportation Integrated Search

    2000-03-01

    The objectives are defined under: 1. Development of the plan, which identifies the preferred program of projects and policy initiatives and outlines the purpose, requirements, responsibilities, estimated cost, and implementation schedule for each pla...

  16. Strategic Planning for Educational Reform and Improvement.

    ERIC Educational Resources Information Center

    D'Amico, Joseph J.

    1988-01-01

    Defines strategic planning, outlines its key elements and activities, and summarizes the difficulties of applying a top-down, profit-driven process to education. Explains Strategic Planning for Educational Reform and Improvement (SPERI), a set of manageable, concise procedures for top school administrators. Describes SPERI applications in an…

  17. An Aid for Planning Programs in Career Education.

    ERIC Educational Resources Information Center

    Illinois State Board of Vocational Education and Rehabilitation, Springfield. Div. of Vocational and Technical Education.

    Offered as an aid for developing sequential occupational education programs, the publication presents a concept in career education planning beginning with kindergarten and continuing through adult years. Career education goals are defined, and steps in planning sequential programs are outlined as follows: (1) organization of the occupational…

  18. An Rx for 20/20 Vision: Vision Planning and Education.

    ERIC Educational Resources Information Center

    Chrisman, Gerald J.; Holliday, Clifford R.

    1996-01-01

    Discusses the Dallas Independent School District's decision to adopt an integrated technology infrastructure and the importance of vision planning for long term goals. Outlines the vision planning process: first draft; environmental projection; restatement of vision in terms of market projections, anticipated customer needs, suspected competitor…

  19. Simple Steps to a Successful Workshop. CSLA Guide.

    ERIC Educational Resources Information Center

    Lewis, Dorothy G.

    This document provides guidelines for workshop planning. The first section, "Getting Started," discusses identifying needs, choosing the workshop format, setting goals, and forming a planning committee. The second section, "Procedure for the Planning Committee," lists seven main tasks. The third section, "Duties of the Personnel," outlines the…

  20. Socioeconomic change in planning provinces of the Northwest Forest Plan region.

    Treesearch

    Ellen M. Donoghue; N. Lynnae Sutton

    2006-01-01

    The Northwest Forest Plan's 1994 Record of Decision (ROD) established a framework for a new ecosystem approach to federal land management across 24 million acres of the Pacific Northwest. One strategy outlined in the ROD combined ecosystem management and civic involvement in the creation of planning provinces, consisting of 12 contiguous multi-ownership areas...

  1. Foothill-De Anza Community College District, 2005: Planning for the New Millennium. Educational Master Plan, Spring 1999.

    ERIC Educational Resources Information Center

    Foothill-De Anza Community Coll. District, Los Altos Hills, CA.

    This document presents Foothill-De Anza Community College District's educational master plan. This report begins with the district's mission statement and is divided into five parts. "Preface: The Last Decade" looks at what occurred at Foothill-De Anza Community College District from 1988-98. "Plan Overview" outlines the…

  2. Incorporating Argumentation through Forensic Science

    ERIC Educational Resources Information Center

    Wheeler, Lindsay B.; Maeng, Jennifer L.; Smetana, Lara K.

    2014-01-01

    This article outlines how to incorporate argumentation into a forensic science unit using a mock trial. Practical details of the mock trial include: (1) a method of scaffolding students' development of their argument for the trial, (2) a clearly outlined set of expectations for students during the planning and implementation of the mock…

  3. Hypersonic CFD applications at NASA Langley using CFL3D and CFL3DE

    NASA Technical Reports Server (NTRS)

    Richardson, Pamela F.

    1989-01-01

    The CFL3D/CFL3DE CFD codes and the industrial use status of the codes are outlined. Comparison of grid density, pressure, heat transfer, and aerodynamic coefficience are presented. Future plans related to the National Aerospace Plane Program are briefly outlined.

  4. Computing and Accounting Office Occupations; Suggested Curricula Guide.

    ERIC Educational Resources Information Center

    Roman, John C.; And Others

    These curriculum outlines are for administrator, supervisor, and teacher use in planning courses at local levels according to community needs and availability of facilities, equipment, and teaching time. The guide may also be used in developing and organizing courses for manpower development and training programs. The course outlines and other…

  5. Centralized mission planning and scheduling system for the Landsat Data Continuity Mission

    USGS Publications Warehouse

    Kavelaars, Alicia; Barnoy, Assaf M.; Gregory, Shawna; Garcia, Gonzalo; Talon, Cesar; Greer, Gregory; Williams, Jason; Dulski, Vicki

    2014-01-01

    Satellites in Low Earth Orbit provide missions with closer range for studying aspects such as geography and topography, but often require efficient utilization of space and ground assets. Optimizing schedules for these satellites amounts to a complex planning puzzle since it requires operators to face issues such as discontinuous ground contacts, limited onboard memory storage, constrained downlink margin, and shared ground antenna resources. To solve this issue for the Landsat Data Continuity Mission (LDCM, Landsat 8), all the scheduling exchanges for science data request, ground/space station contact, and spacecraft maintenance and control will be coordinated through a centralized Mission Planning and Scheduling (MPS) engine, based upon GMV’s scheduling system flexplan9 . The synchronization between all operational functions must be strictly maintained to ensure efficient mission utilization of ground and spacecraft activities while working within the bounds of the space and ground resources, such as Solid State Recorder (SSR) and available antennas. This paper outlines the functionalities that the centralized planning and scheduling system has in its operational control and management of the Landsat 8 spacecraft.

  6. Community Involvement Plan for Northeast Church Rock and Kerr-McGee Quivira Mine Sites

    EPA Pesticide Factsheets

    This Community Involvement Plan outlines opportunities for individual participation and meaningful information sharing regarding EPA’s activities in communities near Northeast Churchrock and Kerr-McGee Quivira Mine Sites.

  7. One-Year Plan for Library Services.

    ERIC Educational Resources Information Center

    Caroline County Public Library, Denton, MD.

    This action plan for the Caroline County (MD) Public Library describes the key elements of library service for the 1985-86 fiscal year, derived from the library's long range plan for 1985-90. Objectives, strategies, activities, and timetables for accomplishing the following goals are outlined: (1) citizens of the county will increasingly meet…

  8. Review and Prospects of Educational Planning and Management in the Arab States.

    ERIC Educational Resources Information Center

    Gennaoui, Antoine M.

    1991-01-01

    Discusses educational planning and administration in the Arab countries during the last decade. Outlines future prospects as they appeared before the Gulf War. Includes structure, practice, mechanisms, and relations between planning structures and administrative authorities. Divides area by geographical contiguity, socio-cultural similarities,…

  9. Do Students Need a Deferred Tuition Payment Plan?

    ERIC Educational Resources Information Center

    Duplass, James A.

    1984-01-01

    Wayne State University's experiences in altering its deferred tuition payment plan to improve cash flow but not adversely affect enrollment are outlined and analyzed. The new plan saved money for the university and encouraged early registration, and most students opted to prepay tuition, saving the late payment fee. (MSE)

  10. Cypress College Strategic Plan, 2000-2004.

    ERIC Educational Resources Information Center

    Cypress Coll., CA.

    This document outlines Cypress College's Strategic Plan to be used to guide decision-making and resource allocation for the years 2000 through 2004. The Strategic Plan begins with the Cypress College Vision Statement: building a college-wide learning community for student success. The Mission Statement states that Cypress College is committed to…

  11. Activity Guide for Nutrition Education, Grades K-3.

    ERIC Educational Resources Information Center

    Chula Vista City School District, CA.

    This activity guide for foods and nutrition education at the primary level is divided into two sections: lesson plans and resource materials. Five concepts are outlined in the lesson plan: food choices, factors influencing choices, consumer competencies, food related careers, and food protection. Each lesson plan provides information on…

  12. 20 CFR 416.1181 - What is a plan to achieve self-support (PASS)?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... earnings level reached. (c) If your employment goal is self-employment, you must include a business plan that defines the business, provides a marketing strategy, details financial data, outlines the operational procedures, and describes the management plan. (d) Your progress will be reviewed at least...

  13. Planning for Change in Higher Education.

    ERIC Educational Resources Information Center

    Ostergren, Bertil

    This document, adapted to readers who are not familiar with institutional details in Swedish higher education, outlines planning and management at regional and central levels. Emphasis is placed on qualitative aspects of planning and on identification of obstacles and possibilities of change and innovation. A central problem for the study is to…

  14. Risk management and disaster recovery planning for online libraries.

    PubMed

    Uzwyshyn, Ray

    2015-01-01

    This article presents an overview of risk management and disaster recovery planning for online libraries. It is suitable for a broad audience interested in online libraries and research centers in universities and colleges. It outlines risk mitigation strategies, and disaster recover planning for online resource-centered information systems.

  15. Tying Resource Allocation and TQM into Planning and Assessment Efforts.

    ERIC Educational Resources Information Center

    Mullendore, Richard H.; Wang, Li-Shing

    1996-01-01

    Describes the evolution of a model, developed by student affairs officials, which outlines a planning process for implementing Total Quality Management. Presents step-by-step instructions for the model's deployment and discusses such issues as transitions, planning forms, goals, and professional and personal growth needs. (RJM)

  16. Using Research To Inform Business and Strategic Decisions.

    ERIC Educational Resources Information Center

    Young, Graeme

    This paper examines and reviews research techniques used to support business and strategic planning at a large metropolitan technical and further education (TAFE) college. Section 1 is an outline of the structure of Chisholm Institute's planning and research processes. It discusses the management structure, strategic plan, and departments within…

  17. Effects of high energy radiation on the mechanical properties of epoxy-graphite fiber reinforced composites

    NASA Technical Reports Server (NTRS)

    Fornes, R. E.; Gilbert, R. D.; Memory, J. D.

    1984-01-01

    The effects of high energy radiation on the mechanical properties and on the molecular and structural properties of graphite fiber reinforced composites were assessed so that the durability of such composites in space applications could be predicted. Investigative techniques including ESR and infrared spectroscopy, ESCA, contact angle measurements, and dynamic and static mechanical testing (3-point bending and interlaminar shear) were employed. The results using these different techniques are individually described, and the implications of the data are discussed. The proposed plan of work for the next fiscal year is outlined.

  18. Development of Smart Precision Forest in Conifer Plantation in Japan Using Laser Scanning Data

    NASA Astrophysics Data System (ADS)

    Katoh, M.; Deng, S.; Takenaka, Y.; Cheung, K.; Oono, K.; Horisawa, M.; Hyyppä, J.; Yu, X.; Liang, X.; Wang, Y.

    2017-10-01

    Currently, the authors are planning to launch a consortium effort toward Japan's first smart precision forestry project using laser data and to develop this technology throughout the country. Smart precision forestry information gathered using the Nagano model (laser scanning from aircraft, drone, and backpack) is being developed to improve the sophistication of forest information, reduce labor-intensive work, maintain sustainable timber productivity, and facilitate supply chain management by laser sensing information in collaboration with industry, academia, and government. In this paper, we outline the research project and the technical development situation of unmanned aerial vehicle laser scanning.

  19. A candidate architecture for monitoring and control in chemical transfer propulsion systems

    NASA Technical Reports Server (NTRS)

    Binder, Michael P.; Millis, Marc G.

    1990-01-01

    To support the exploration of space, a reusable space-based rocket engine must be developed. This engine must sustain superior operability and man-rated levels of reliability over several missions with limited maintenance or inspection between flights. To meet these requirements, an expander cycle engine incorporating a highly capable control and health monitoring system is planned. Alternatives for the functional organization and the implementation architecture of the engine's monitoring and control system are discussed. On the basis of this discussion, a decentralized architecture is favored. The trade-offs between several implementation options are outlined and future work is proposed.

  20. 'Strategic approach' can reveal benefits.

    PubMed

    Baillie, Jonathan

    2011-01-01

    Speaking at last October's Healthcare Estates 2010 conference in Manchester, Peter Haggarty, assistant director, Health Facilities Scotland, outlined some of the key steps and priorities for large healthcare providers seeking to establish and implement an effective asset management strategy, focusing particularly on work ongoing in this area in the Scottish public health service. While any radical change to a large healthcare organisation's existing asset management practices could be "challenging", both for the organisation itself, and for its staff, with "sufficient planning, persistence, and support", such changes could, he told delegates, often result in "unanticipated benefits". HEJ editor Jonathan Baillie reports.

  1. Nurse absence--the causes and the consequences.

    PubMed

    Beil-Hildebrand, M

    1996-01-01

    This paper addresses nurse absence as it occurs in health care organizations and as a form of withdrawal behaviour from work. Absence represents a traditional domain of conflict between nursing management and their employees in day-to-day practice. The aim of the following discussion is to extend nursing management's understanding of the topic as a precondition for well-balanced schedules and effective human resource planning. A discussion of planned and unplanned absence thus arises and appropriate types of measurement, taking employee absence behaviour into account, are outlined. The implications of the arguments, developed in detail in the first part of the paper, are applied in the second part using a hypothetical account. In order to illustrate the importance of managing absence by nursing management, a method for calculating schedules is described which investigates the organizational control of planned and unplanned absence. This method proposes a seven stage calculation and highlights the processes that are essential for taking absence into account.

  2. SOARing Into Strategic Planning: Engaging Nurses to Achieve Significant Outcomes.

    PubMed

    Wadsworth, Barbara; Felton, Fiona; Linus, Rita

    2016-01-01

    In 2013, a new system chief nursing officer engaged the nursing leaders and staff in an Appreciative Inquiry process utilizing strengths, opportunities, aspirations, and results (SOAR), and a Journey of Excellence to assess and understand the current environment. The ultimate goal was to engage all nurses in strategic planning and goal setting to connect their patient care to the system strategic initiatives. This work led to the creation of a nursing vision, a revised professional practice model and greater council alignment, resulting in significant positive change and ongoing advancement throughout the system. The shared decision-making structure was key to the process with a direct connection of each council's goals, leading to the successful achievement of 34 of the 36 goals in 2 years. This article outlines the process, tools, and staff engagement strategies used to achieve system-wide success. This methodology has improved the outcomes across the organization in both small and system-wide work groups. This work can easily be replicated and adapted to help disparate staffs brought together through mergers or acquisitions to become aligned as a new team. This process, model, and framework, provides structure and results in significant outcomes that recognizes and celebrates the work of individual entities while aligning future strategies and goals.

  3. Putting more ‘modern’ in modern physics education: a Knowledge Building approach using student questions and ideas about the universe

    NASA Astrophysics Data System (ADS)

    Wagner, Glenn

    2017-03-01

    Student-generated questions and ideas about our universe are the start of a rich and highly motivating learning environment. Using their curiosity-driven questions and ideas, students form Knowledge Building groups or ‘communities’ where they plan, set goals, design questions for research, and assess the progress of their work, tasks that were once under the control of the teacher. With the understanding that all knowledge and ideas are treated as improvable, students work collaboratively at their level of competency to share their knowledge, ideas and understandings gained from authoritative sources and laboratory activities. Over time, students work collectively to improve the knowledge and ideas of others that result in advances in understanding that benefit not only the individual but the community as a whole. Learning outcomes reported in this paper demonstrate that a Knowledge Building environment applied to introductory cosmology produced similar gains in knowledge and understanding surrounding foundational concepts compared to teacher-centred learning environments. Aside from new knowledge and understanding, students develop important skills and competencies such as question-asking, idea development, communication, collaboration that are becoming ever more important for 21st century living and working. Finally, the process of planning and initiating a Knowledge Building environment that produced the results reported in this paper is outlined.

  4. Strategic plan for infrastructure optimization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Donley, C.D.

    This document represents Fluor Daniel Hanford`s and DynCorp`s Tri-Cities Strategic Plan for Fiscal Years 1998--2002, the road map that will guide them into the next century and their sixth year of providing safe and cost effective infrastructure services and support to the Department of Energy (DOE) and the Hanford Site. The Plan responds directly to the issues raised in the FDH/DOE Critical Self Assessment specifically: (1) a strategy in place to give DOE the management (systems) and physical infrastructure for the future; (2) dealing with the barriers that exist to making change; and (3) a plan to right-size the infrastructuremore » and services, and reduce the cost of providing services. The Plan incorporates initiatives from several studies conducted in Fiscal Year 1997 to include: the Systems Functional Analysis, 200 Area Water Commercial Practices Plan, $ million Originated Cost Budget Achievement Plan, the 1OO Area Vacate Plan, the Railroad Shutdown Plan, as well as recommendations from the recently completed Review of Hanford Electrical Utility. These and other initiatives identified over the next five years will result in significant improvements in efficiency, allowing a greater portion of the infrastructure budget to be applied to Site cleanup. The Plan outlines a planning and management process that defines infrastructure services and structure by linking site technical base line data and customer requirements to work scope and resources. The Plan also provides a vision of where Site infrastructure is going and specific initiatives to get there.« less

  5. Racial Equity and School Social Work

    ERIC Educational Resources Information Center

    Stone, Susan

    2017-01-01

    This manuscript outlines the beginning contours of a racial justice and equity framework for school social work. It briefly summarizes prior social work scholarship related to social and racial justice and race, outline forces related to school social work professional practice that likely shape limited explicit attention to conceptions of racial…

  6. Modeling Transportation Systems : an Overview

    DOT National Transportation Integrated Search

    1971-06-01

    The purpose of this report is to outline the role of systems analysis and mathematical modeling in the planning of transportation systems. The planning process is divided into three sectors (demand, supply, and policy) reflecting the demand for trans...

  7. Nitrate Waste Treatment Sampling and Analysis Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vigil-Holterman, Luciana R.; Martinez, Patrick Thomas; Garcia, Terrence Kerwin

    2017-07-05

    This plan is designed to outline the collection and analysis of nitrate salt-bearing waste samples required by the New Mexico Environment Department- Hazardous Waste Bureau in the Los Alamos National Laboratory (LANL) Hazardous Waste Facility Permit (Permit).

  8. Transportation Management Area Planning Certification Review Primer: Revised January 18, 2018

    DOT National Transportation Integrated Search

    2018-01-18

    This primer outlines key concepts and expectations of a Transportation Management Area (TMA) Planning Certification Review. Reflecting on the collective experiences of past Certification Reviews, this includes references to relevant laws and regulati...

  9. System design of the Pioneer Venus spacecraft. Volume 14: Test planning trades

    NASA Technical Reports Server (NTRS)

    Pedretti, C. D.

    1973-01-01

    Pioneer Venus system test plans and trade studies which were first published as Study Tasks (References 1 through 5) are reviewed. The plan and trade studies are presented in a condensed form. Greater detail may be found in the referenced study tasks if desired. All significant conclusions and plan outlines of the original studies are, presented.

  10. An Academic Development Plan for Post-Secondary Education on the Multi-Ethnic Island of Lana'i.

    ERIC Educational Resources Information Center

    Pezzoli, J. A.; McOmber, Phyllis

    In 1980, Maui Community College (MCC) established the Lana'i Education Center (LEC) on the island of Lana'i to provide courses and services to island residents. Related to MCC's college-wide planning document, this Academic Development Plan outlines the planning strategies, long-range goals, and priorities specific to MCC's Lana'i efforts for…

  11. "We are all in this together": integrated health service plans in Ontario.

    PubMed

    Eliasoph, Hy; Monaghan, Barry; Beaudoin, Rémy; Cushman, Robert; DuBois-Wing, Gwen; Emery, Marilyn J; Fenn, W Michael; Hanmer, Sandra J; Huras, Paul; Lowi-Young, Mimi; Mandy, Pat; Trimnell, Jean; Switzer, Garry; Woolgar, Tony; Butler, John

    2007-01-01

    Ontario's 14 Local Health Integration Networks (LHINs) produced their first major deliverable when they issued their integrated health service plans in October 2006. This article reviews the experience of LHINs in meeting this challenge, outlines the process and outcome dimensions of the plans and discusses eight opportunities for LHINs as they act on the basis of their plans.

  12. Planning to Explore: Using a Coordinated Multisource Infrastructure to Overcome Present and Future Space Flight Planning Challenges

    NASA Technical Reports Server (NTRS)

    Balaban, Edward; Orosz, Michael; Kichkaylo, Tatiana; Goforth, Andre; Sweet, Adam; Neches, Robert

    2006-01-01

    Few human endeavors present as much of a planning and scheduling challenge as space flight, particularly manned space flight. Just on the operational side of it, efforts of thousands of people across hundreds of organizations need to be coordinated. Numerous tasks of varying complexity and nature, from scientific to construction, need to be accomplished within limited mission time frames. Resources need to be carefully managed and contingencies worked out, often on a very short notice. From the beginning of the NASA space program, planning has been done by large teams of domain experts working months, sometimes years, to put together a single mission. This approach, while proven very reliable up to now, is becoming increasingly harder to sustain. Elevated levels of NASA space activities, from deployment of the new Crew Exploration Vehicle (CEV) and completion of the International Space Station (ISS), to the planned lunar missions and permanent lunar bases, will put an even greater strain on this largely manual process. While several attempts to automate it have been made in the past, none have fully succeeded. In this paper we describe the current NASA planning methods, outline their advantages and disadvantages, discuss the planning challenges of upcoming missions and propose a distributed planning/scheduling framework (CMMD) aimed at unifying and optimizing the planning effort. CMMD will not attempt to make the process completely automated, but rather serve in a decision support capacity for human managers and planners. It will help manage information gathering, creation of partial and consolidated schedules, inter-team negotiations, contingencies investigation, and rapid re-planning when the situation demands it. The fist area of CMMD application will be planning for Extravehicular Activities (EVA) and associated logistics. Other potential applications, not only in the space flight domain, and future research efforts will be discussed as well.

  13. General methodology: Costing, budgeting, and techniques for benefit-cost and cost-effectiveness analysis

    NASA Technical Reports Server (NTRS)

    Stretchberry, D. M.; Hein, G. F.

    1972-01-01

    The general concepts of costing, budgeting, and benefit-cost ratio and cost-effectiveness analysis are discussed. The three common methods of costing are presented. Budgeting distributions are discussed. The use of discounting procedures is outlined. The benefit-cost ratio and cost-effectiveness analysis is defined and their current application to NASA planning is pointed out. Specific practices and techniques are discussed, and actual costing and budgeting procedures are outlined. The recommended method of calculating benefit-cost ratios is described. A standardized method of cost-effectiveness analysis and long-range planning are also discussed.

  14. Food Service Trades. Instructional System Development Model for Vermont Area Vocational Centers.

    ERIC Educational Resources Information Center

    1975

    The model curriculum guide in food service occupations consists of 26 units of study presented in outline form and intended for use at the secondary level. The outline presents a concept statement, behavioral objective, learning activities, teacher resource needs, suggested evaluation techniques, lesson objectives, a lesson/unit plan, and…

  15. ESEA Title I Migrant Administration Manual Project Preparation and Program Management.

    ERIC Educational Resources Information Center

    Seurynck, John L.; Hicks, Garlin A.

    The manual outlines information on design and operation of the ESEA (Elementary and Secondary Education Act) Title I Migrant Education Program at the state and local levels. Part I outlines information on the state level: legislative authorization and general responsibilities of the state education agency (SEA); annual program plan and budget;…

  16. The Use of Hand Tools in Agricultural Mechanics.

    ERIC Educational Resources Information Center

    Montana State Univ., Bozeman. Dept. of Agricultural and Industrial Education.

    This document contains a unit for teaching the use of hand tools in agricultural mechanics in Montana. It consists of an outline of the unit and seven lesson plans. The unit outline contains the following components: situation, aims and goals, list of lessons, student activities, teacher activities, special equipment needed, and references. The…

  17. Workshop Outline and Training Materials for Adult Learners Developed During the Metric Leader Training Project for Maine.

    ERIC Educational Resources Information Center

    Butzow, John W.; Yvon, Bernard R.

    Outlines of five sessions of the Metric Leader Training Project for Maine are included in this publication. Topics are: (1) Introduction - Length - Temperature; (2) Volume/Capacity - Mass/Weight; (3) Metric Advocacy - Length - Area - Temperature; (4) Metric Education Resources; and (5) Metric Education Planning - Metric Olympics - Final…

  18. ESSENTIALS OF MERCHANDISING, A SUGGESTED ADULT DISTRIBUTIVE EDUCATION COURSE OUTLINE.

    ERIC Educational Resources Information Center

    MARKMAN, STANLEY

    THIS OUTLINE FOR A COURSE IN THE ESSENTIALS OF MERCHANDISING IS DESIGNED FOR THE INEXPERIENCED RETAIL EMPLOYEE. THE COURSE IS PLANNED FOR SIX 2-HOUR SESSIONS ON (1) FUNDAMENTALS OF MERCHANDISING, (2) TERMINOLOGY AND MATHEMATICS OF MERCHANDISING, (3) BUYING POLICIES AND PRACTICES, (4) MARKET REPRESENTATIVES, (5) TERMS OF PURCHASE, INCLUDING…

  19. Notification: Hotline Complaint – Region 7 Compliance with Bid, Payment, and Performance Bond Requirements Outlined in Federal Acquisition Regulation (FAR) Part 28

    EPA Pesticide Factsheets

    June 1, 2012. In response to an anonymous hotline complaint, the OIG plans to conduct a review of Region 7’s compliance with bid, payment, and performance bond requirements outlined in Federal Acquisition Regulation (FAR) Part 28.

  20. Governors' Top Education Issues: State of the States 2014

    ERIC Educational Resources Information Center

    Thomsen, Jennifer

    2014-01-01

    Education issues were again at the forefront when the leaders of 42 states and the District of Columbia outlined their priorities in their 2014 State of the State addresses. Governors outlined their plans for increasing the quality and availability of education--from preschool through postsecondary--to spur economic growth and enhance the quality…

  1. The NASA planning process, appendix D. [as useful planning approach for solving urban problems

    NASA Technical Reports Server (NTRS)

    Annett, H. A.

    1973-01-01

    The planning process is outlined which NASA used in making some fundamental post-Apollo decisions concerning the reuseable space shuttle and the orbiting laboratory. It is suggested that the basic elements and principles of the process, when combined, form a useful planning approach for solving urban problems. These elements and principles are defined along with the basic strengths of the planning model.

  2. Data management and processing plan, Department of Applied Geodesy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-08-01

    This plan outlines Data Management and Data Processing requirements of the Department of Applied Geodesy (DAG) and presents the plan to meet these requirements (These requirements are derived from the functional needs of the Department to meet the SSCL alignment tolerances and schedules). In addition, this document presents a schedule for the implementation of this plan. This document is an integral part of the Alignment Plan of the SSCL.

  3. AgRISTARS: Renewable resources inventory. Land information support system implementation plan and schedule. [San Juan National Forest pilot test

    NASA Technical Reports Server (NTRS)

    Yao, S. S. (Principal Investigator)

    1981-01-01

    The planning and scheduling of the use of remote sensing and computer technology to support the land management planning effort at the national forests level are outlined. The task planning and system capability development were reviewed. A user evaluation is presented along with technological transfer methodology. A land management planning pilot test of the San Juan National Forest is discussed.

  4. Five-Year Strategic Plan: Fiscal Years 2011-2015

    ERIC Educational Resources Information Center

    US Department of Education, 2010

    2010-01-01

    This paper presents the U.S. Department of Education (Department) Office of Inspector General (OIG) Strategic Plan for fiscal years 2011 through 2015. This plan describes the focus and direction of OIG's operations over the next five years, establishes its organizational goals, and outlines the strategies it will employ to reach those goals and…

  5. Alaska Statewide Plan for Postsecondary Education, 1986-1990: A Draft for Public Comment. Volume I.

    ERIC Educational Resources Information Center

    Alaska State Commission on Postsecondary Education, Juneau.

    This report, the first statewide master plan for postsecondary education in Alaska, outlines strategies and recommendations to achieve the following planning goals: (1) promote excellence to improve educational service; (2) enhance accountability of the educational process; (3) foster efficiency within the enterprise; and (4) improve access to…

  6. Developing a Career Planning Center. Occupational Education Research Project Final Report.

    ERIC Educational Resources Information Center

    Kidd, Frank E.; Embry, Judy K.

    Designed as a guide for those community college institutions developing a career planning center, this handbook presents a model for planning and implementing such a center. Options for centers are suggested for three levels of development and staffing: self-directed, intermediate, and comprehensive. Chapter 1 outlines the rationale and possible…

  7. Planning Brings Vision Into Focus (Brochure)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2013-04-01

    This case study/fact sheet highlights the strategic energy planning process for Tribes that was developed by the DOE Office of Indian Energy. This nine-step process, which is outlined in one of the foundational education courses offered by the Office, enables Tribes to pursue energy projects in a well-planned and strategic manner.

  8. Merit Pay Plans for Teachers: Status and Descriptions. ERS Report.

    ERIC Educational Resources Information Center

    Educational Research Service, Arlington, VA.

    This report, an update of the 1978 survey of national merit pay plans for teachers, provides descriptive data on currently operating merit pay plans and state level activities. Outlining current research, the report points out that neither a commonly acceptable definition of merit pay nor a generally acceptable method of determining meritorious…

  9. An Enrollment Marketing Plan for Institutions of Higher Learning: An Update.

    ERIC Educational Resources Information Center

    Bingham, Frank G., Jr.

    1996-01-01

    A college marketing model consisting of several strategies and contingency plans for decision-making under difficult conditions is outlined. The plan provides for orderly transition from one marketing stage to the next logical stage, allowing some control over both internal and external environments, and providing insight into the delicate…

  10. The Place of Education in Manpower Planning in Developing Countries

    ERIC Educational Resources Information Center

    Fapohunda, Olanrewaju J.

    1974-01-01

    Defines manpower planning and outlines its objectives, describes the effects of education on economic growth in developing countries, and discusses problems of education in manpower planning: questions of the source of education, the content, and the percentage of the population ot be educated at a given time. Important political limitations are…

  11. Human Resource Planning: An Introduction. Report 312.

    ERIC Educational Resources Information Center

    Reilly, Peter

    This report is designed to give readers an introduction to the principles of human resource planning (HRP) and the areas in which it can be used, including those facing today's managers. Chapter 1 outlines why some organizations no longer plan, describes the background of change and uncertainty that discouraged them, and defines HRP. Chapter 2…

  12. 42 CFR 9.4 - Physical facility policies and design.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....edu; or view it online at http://oacu.od.nih.gov/regs/guide/guidex.htm. You may inspect a copy at NIH... required to develop disaster and escaped animal contingency plans? The sanctuary facility must prepare disaster and escaped animal contingency plans outlining simple and easy to follow plans for dealing with...

  13. 36 CFR 64.9 - Project costs (State and local projects).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... appropriate conveyance. Project-related planning costs outlined in § 64.9(a)(3), may be incurred prior to...) Construction costs associated with developing the right-of-way for recreation use. (3) Project-related planning required for the acquisition, development and use of the abandoned rights-of-way including master planning...

  14. 78 FR 53732 - National Estuarine Research Reserve System

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-30

    ... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration National Estuarine Research.... ACTION: Notice of approval of the Grand Bay, Mississippi and Delaware National Estuarine Research Reserve... Estuarine Research Reserve Management Plan Revisions. The revised management plans outline the...

  15. Homeland Security Strategic Research Action Plan 2012 - 2016

    EPA Pesticide Factsheets

    EPA’s Homeland Security research plan outline and how it will address science and technological gaps and improve the Agency’s ability to carry out its responsibilities associated with preparing for and responding to, terrorist attacks, and other disasters.

  16. Human Health Risk Assessment Strategic Research Action Plan 2012-2016

    EPA Pesticide Factsheets

    This document outlines the strategic plan for EPA’s Human Health Risk Assessment research efforts, and how they support and are integrated into the overall research portfolio of the Agency’s Office of Research and Development.

  17. 7 CFR 1470.22 - Conservation stewardship plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS CONSERVATION STEWARDSHIP PROGRAM Contracts... process as outlined in the National Planning Procedures Handbook to encourage participants to address... the participant's decisions that describes the schedule of conservation activities to be implemented...

  18. Suitable housing placement: a GIS-based approach.

    PubMed

    Sorrentino, John A; Meenar, Md Mahbubur R; Flamm, Bradley J

    2008-11-01

    The intent of this paper is to operationalize some aspects of local sustainability in a suitable development scenario and to compare its energy-use and environmental impacts to trend development. After a discussion of suburban sprawl, local sustainability, and the current state of the Pennypack Creek Watershed in the Philadelphia metro region, these residential location scenarios are presented. The latter were created using geographic information systems software and are based on projections from the Delaware Valley Regional Planning Commission. The impacts of the scenarios on energy use, air emissions, greenhouse gas emissions, water quality, and biological integrity were estimated with very few data, and the effect on the value of generic ecosystem services was assessed. The suitable development scenario was 29% better in terms of energy use and air and greenhouse gas emissions, 2.4% worse on water quality, and 2.6% better with respect to biological integrity. Given its net beneficial results, recommendations for policies to engender suitable development are made, and an outline of an implementation plan is proposed. Thoughts regarding refinements of the present work and the applicability of the methods used here to other watersheds conclude the work.

  19. Managing multihazards risk in metropolitan USA

    NASA Astrophysics Data System (ADS)

    Aktan, A. Emin; Comfort, Louise K.; Shanis, Donald S.

    2003-07-01

    This proposal outlines an action plan for risk management in the Delaware Valley Metropolitan Region. This plan is consistent with the goals for strengthening homeland security announced by President Bush, and is designed to complement efforts currently under development by Pennsylvania Emergency Management Agency and Department of Health. This plan proposes the formation of a Delaware Valley Risk Management Consortium, representing the critical disciplines and organizations related to risk assessment and management. This group would have membership from academic institutions, government agencies, industry, and nonprofit organizations. This Consortium would develop a systemic scope of work with the appropriate recommendations for technology acquisition, development and integration with risk management policies and procedures. This scope of work would include the development of two related information systems for the Delaware Valley Region. The first would be a comprehensive 'health monitoring' system to assess the continuity of operations, which would use integrated remote sensing and imaging, information gathering, communication, computation, and, information processing and management over wide-area networks covering the entire metropolitan area. The second would use real-time information from the health monitoring system to support interactive communication, search and information exchange needed to coordinate action among the relevant agencies to mitigate risk, respond to hazards and manage its resources efficiently and effectively.

  20. Searching for Correlated Radio Transients & Gravitational Wave Bursts

    NASA Astrophysics Data System (ADS)

    Kavic, Michael; Shawhan, P. S.; Yancey, C.; Cutchin, S.; Simonetti, J. H.; Bear, B.; Tsai, J.

    2013-01-01

    We will discuss an ongoing multi-messenger search for transient radio pulses and gravitational wave bursts. This work is being conducted jointly by the Long Wavelength Array (LWA) and the LIGO Scientific Collaboration (LSC). A variety of astrophysical sources can produce simultaneous emission of gravitational waves and coherent low-frequency electromagnetic radiation. The primary common source motivating this work is the merger of neutron star binaries for which the LWA and LSC instruments have comparable sensitivity. Additional common sources include supernovae, long timescale GRBs and cosmic string cusp events. Data taken by both instruments can be compared to search for correlated signals. Identification of correlated signals can be used to increase the sensitivity of both instruments. We will summarize the coincident observations which have already been conducted and outline plans for future work. We will describe the process being used for synthesizing these data set and present preliminary results.

  1. Impact of a participatory organizational intervention on job characteristics and job stress.

    PubMed

    Mikkelsen, A; Saksvik, P O

    1999-01-01

    Increased employee control and participation are recommended to achieve both "flexible organization" and improvements in health, as outlined in occupational stress intervention models. This study evaluates the impact of a participatory organizational intervention on job stress and job characteristics. The intervention was carried out in two post offices in the Norwegian Postal Service. "Local theories" were seen as the key drivers for organizational improvement and increased control. The underlying dynamics of the intervention were to manipulate employees' learning opportunity and decision authority so as to improve work environment and health. Work groups, in dialogue with a steering committee, conducted diagnosis, action planning, and action taking. Work conditions deteriorated during the observation period in the control groups. In one of the intervention groups, this negative trend was reduced by the intervention. Lack of positive results in the other intervention group may have been due to organizational restructuring and turbulence.

  2. Semi-automated intra-operative fluoroscopy guidance for osteotomy and external-fixator.

    PubMed

    Lin, Hong; Samchukov, Mikhail L; Birch, John G; Cherkashin, Alexander

    2006-01-01

    This paper outlines a semi-automated intra-operative fluoroscopy guidance and monitoring approach for osteotomy and external-fixator application in orthopedic surgery. Intra-operative Guidance module is one component of the "LegPerfect Suite" developed for assisting the surgical correction of lower extremity angular deformity. The Intra-operative Guidance module utilizes information from the preoperative surgical planning module as a guideline to overlay (register) its bone outline semi-automatically with the bone edge from the real-time fluoroscopic C-Arm X-Ray image in the operating room. In the registration process, scaling factor is obtained automatically through matching a fiducial template in the fluoroscopic image and a marker in the module. A triangle metal plate, placed on the operating table is used as fiducial template. The area of template image within the viewing area of the fluoroscopy machine is obtained by the image processing techniques such as edge detection and Hough transformation to extract the template from other objects in the fluoroscopy image. The area of fiducial template from fluoroscopic image is then compared with the area of the marker from the planning so as to obtain the scaling factor. After the scaling factor is obtained, the user can use simple operations by mouse to shift and rotate the preoperative planning to overlay the bone outline from planning with the bone edge from fluoroscopy image. In this way osteotomy levels and external fixator positioning on the limb can guided by the computerized preoperative plan.

  3. Strategic planning for hotel operations: The Ritz-Carlton Hotel Company (Part II).

    PubMed

    Shriver, S J

    1993-01-01

    The Ritz-Carlton Hotel Company won the Malcolm Baldrige National Quality Award in 1992. One key to its success is its strategic planning process. In this second part of a two-part article, Stephen Shriver concludes his review of the Ritz-Carlton's approach to strategic planning. Shriver begins by outlining some key steps in plan development and goes on to describe how the Ritz-Carlton disseminates, implements, and evaluates the plan.

  4. The GGOS Bureau of Networks and Observations: an update on the Space Geodesy Network and the New Implementation Plan for 2017 -18

    NASA Astrophysics Data System (ADS)

    Pearlman, Michael R.; Ma, Chopo; Neilan, Ruth; Noll, Carey; Pavlis, Erricos; Saunier, Jérôme; Schoene, Tilo; Barzaghi, Riccardo; Thaller, Daniela; Bergstrand, Sten; Mueller, Juergen

    2017-04-01

    Working with the IAG geometric services (VLBI, SLR, GNSS, and DORIS) the Bureau continues to advocate for the expansion and upgrade of the space geodesy networks for the maintenance and improvement of the reference frame and other application, and for the extension and integration with other techniques. New sites are being established following the GGOS concept of "core" and co-location sites; new technologies are being implemented to enhance performance in data yield as well as accuracy. In particular, several groups are undertaking initiatives and seeking partnerships to update existing sites and expand the networks in geographic areas void of coverage. The Bureau continues to meet with organizations to discuss possibilities of new and expanded participation and to promote the concept of partnerships. The Bureau provides the opportunity for representatives from the services to meet and share progress and plans, and to discuss issues of common interest. The Bureau monitors the status and projects the evolution of the network based on information from the current and expected future participants. Of particular interest at the moment is the integration of gravity and tide gauge networks. The Committees and Joint Working Groups play an essential role in the Bureau activity. The Standing Committee on Performance Simulations and Architectural Trade-off (PLATO) uses simulation and analysis techniques to project future network capability and to examine trade-off options. The Committee on Data and Information is working on a strategy for a GGOS metadata system on a near term plan for data products and a more comprehensive longer-term plan for an all-inclusive system. The Committee on Satellite Missions is working to enhance communication with the space missions, to advocate for missions that support GGOS goals and to enhance ground systems support. The IERS Working Group on Site Survey and Co-location (also participating in the Bureau) is working to enhance standardization in procedures, outreach and to encourage new survey groups to participate, and improve procedures to determine systems reference points. The 2017-2018 Implementation Plan for the GGOS Bureau of Networks and Observations has been posted on the GGOS website. We will outline progress over the past two years and discuss the status of the network and updated plan.

  5. Haulage Truck Operator. Open Pit Mining Job Training Series.

    ERIC Educational Resources Information Center

    British Columbia Dept. of Education, Victoria.

    This training outline for haulage truck operators, one in a series of eight outlines, is designed primarily for company training foremen or supervisors and for trainers to use as an industry-wide guideline for heavy equipment operator training in open pit mining in British Columbia. Intended as a guide for preparation of lesson plans both for…

  6. Rotary Drill Operator. Open Pit Mining Job Training Series.

    ERIC Educational Resources Information Center

    Savilow, Bill

    This training outline for rotary drill operators, one in a series of eight outlines, is designed primarily for company training foremen or supervisors and for trainers to use as an industry-wide guideline for heavy equipment operator training in open pit mining in British Columbia. Intended as a guide for preparation of lesson plans both for…

  7. Track Dozer Operator. Open Pit Mining Job Training Series.

    ERIC Educational Resources Information Center

    British Columbia Dept. of Education, Victoria.

    This training outline for track dozer operators, one in a series of eight outlines, is designed primarily for company training foremen or supervisors and for trainers to use as an industry-wide guideline for heavy equipment operator training in open pit mining in British Columbia. Intended as a guide for preparation of lesson plans both for…

  8. Grader Operator. Open Pit Mining Job Training Series.

    ERIC Educational Resources Information Center

    Savilow, Bill

    This training outline for grader operators, one in a series of eight outlines, is designed primarily for company training foremen or supervisors and for trainers to use as an industry-wide guideline for heavy equipment operator training in open pit mining in British Columbia. Intended as a guide for preparation of lesson plans both for classroom…

  9. Heavy Duty Tireman. Open Pit Mining Job Training Series.

    ERIC Educational Resources Information Center

    McColman, Don

    This training outline for heavy duty tiremen, one in a series of eight outlines, is designed primarily for company training foremen or supervisors and for trainers to use as an industry-wide guideline for heavy equipment operator training in open pit mining in British Columbia. Intended as a guide for preparation of lesson plans both for classroom…

  10. Rubber Tire Dozer Operator. Open Pit Mining Job Training Series.

    ERIC Educational Resources Information Center

    British Columbia Dept. of Education, Victoria.

    This training outline for rubber tire dozer operators, one in a series of eight outlines, is designed primarily for company training foremen or supervisors and for trainers to use as an industry-wide guideline for heavy equipment operator training in open pit mining in British Columbia. Intended as a guide for preparation of lesson plans both for…

  11. Front End Loader Operator. Open Pit Mining Job Training Series.

    ERIC Educational Resources Information Center

    Savilow, Bill

    This training outline for front end loader operators, one in a series of eight outlines, is designed primarily for company training foremen or supervisors and for trainers to use as an industry-wide guideline for heavy equipment operator training in open pit mining in British Columbia. Intended as a guide for preparation of lesson plans both for…

  12. A University?Wide Vision of Teaching and Learning with Information Technologies

    ERIC Educational Resources Information Center

    Masi, Anthony C.; Winer, Laura R.

    2005-01-01

    This paper outlines McGill University's responses to the challenges of teaching and learning with information systems and technologies; it also gives a description of the underlying philosophy that is guiding these actions. The context at McGill is briefly outlined, with a discussion of the importance of planning and the relevance of these issues…

  13. Suggested Curriculum Guide for Developing a Program in Appliance Service and Repair. Bulletin No. 48-174.

    ERIC Educational Resources Information Center

    Illinois State Board of Vocational Education and Rehabilitation, Springfield. Div. of Vocational and Technical Education.

    The outline curriculum guide has been developed to assist in planning, developing, and instructing a program in appliance service and repair. The material consists of a unit outline and suggested exercieses and assignments for 17 areas: shop mathematics, communication skills, safety, orientation to appliance service and repair, blueprint reading,…

  14. Time Management: A Lesson Plan, Transparencies, Handouts and Media Evaluations on the Topic.

    ERIC Educational Resources Information Center

    Campbell, Clifton P.

    Intended for use in a 3-hour instructional program at the graduate level, the packet contains an outline of the instructional content, 9 transparencies, 12 handouts, and 7 supplementary materials. The outline is organized in terms of content, instructor activity (such as showing a transparency), and student activity. Instruction covers the…

  15. Shovel Operator. Open Pit Mining Job Training Series.

    ERIC Educational Resources Information Center

    Hartley, Larry

    This training outline for shovel operators, one in a series of eight outlines, is designed primarily for company training foremen or supervisors and for trainers to use as an industry-wide guideline for heavy equipment operator training in open pit mining in British Columbia. Intended as a guide for preparation of lesson plans both for classroom…

  16. Teaching Science Fiction Film Genre: Theory, Form, and Theme.

    ERIC Educational Resources Information Center

    Roth, Lane

    Intended to provide a paradigm for teachers planning a course in science fiction film, the instructional approach outlined in this paper examines films in relation to each other and to culture. The paper provides a course outline, a discussion of lecture topics, a suggested reading list, and a film list. The instructional approach suggested by the…

  17. Small Business Location and Layout.

    ERIC Educational Resources Information Center

    Small Business Administration, Washington, DC.

    As an approach to teaching small-business location and layout, this publication contains material for teaching one session of a basic course. The sections of the publication are as follows: (1) The Lesson Plan--an outline of the material covered, which may be used as a teaching guide, presented in two columns: an outline of the presentation, and a…

  18. OUTLINE FOR OCCUPATIONAL HOME ECONOMICS COURSE IN COMMERCIAL SEWING AND ALTERATIONS.

    ERIC Educational Resources Information Center

    Alabama State Dept. of Education, Montgomery. Home Economics Service.

    THE EXPERIMENTAL OUTLINE IS FOR TEACHER USE IN PLANNING A 2-SEMESTER COURSE TO PREPARE 11TH AND 12TH GRADE STUDENTS FOR ENTRY LEVEL COMMERCIAL CLOTHING JOBS SUCH AS ALTERERS, SEWING MACHINE OPERATORS, AND DRAPERY AND SLIPCOVER SEAMSTRESSES. IT WAS DEVELOPED BY VOCATIONAL HOME ECONOMICS TEACHERS AND STATE SUPERVISORS. STUDENTS LEARN TO PERFORM…

  19. PV history: Lessons for the future

    NASA Technical Reports Server (NTRS)

    Ralph, E. L.

    1982-01-01

    A history of terrestrial photovoltaics is presented indicating that the photovoltaic potential was well perceived and a good technology developent plan was formulated and implemented. Major accomplishments of the technology plan are highlighted. Research objectives and research needs for the future are outlined.

  20. U.S. Draft Domestic Action Plan for Lake Erie

    EPA Pesticide Factsheets

    In 2016, in response to the 2012 Great Lakes Water Quality Agreement commitments, Canada and the U.S. adopted phosphorus reduction targets for Lake Erie. Each country is developing domestic action plans which outline strategies for meeting the new targets.

  1. Human Mission to Europa and Titan - Why Not? Executive Summary

    NASA Technical Reports Server (NTRS)

    Finarelli, Margaret G.

    2005-01-01

    Outline a step-by-step Development Plan of the key barriers and their solutions to enable human exploration of the outer solar system. Secondary: Perform a case study which supports and emphasizes the key elements of the Development Plan.

  2. I-394 Minneapolis, Minnesota, analysis plan.

    DOT National Transportation Integrated Search

    2010-02-01

    This AMS Analysis Plan for the Interstate 394 (I-394) Pioneer Corridor outlines the various tasks associated with the application of the ICM AMS tools to the corridor in support of a benefit/cost assessment of the proposed strategies. The report prov...

  3. Life Cycle Project Plan Outline: Web Sites and Web-based Applications

    EPA Pesticide Factsheets

    This tool is a guideline for planning and checking for 508 compliance on web sites and web based applications. Determine which EIT components are covered or excepted, which 508 standards and requirements apply, and how to implement them.

  4. IDENTIFYING HIGH PRIORITY EXPOSURE RESEARCH SUPPORTING THE EPA ASBESTOS ACTION PLAN

    EPA Science Inventory

    The EPA Asbestos Action Plan outlines areas, including two exposure assessment areas, where research is needed to reduce uncertainties in current asbestos risk assessments. Scientists from the National Exposure Research Laboratory (NERL) recently conducted survey and literature ...

  5. iPhone in NASA Ground Operations

    NASA Technical Reports Server (NTRS)

    Benedict, Ashley; Byrd, Keena; Ignacio, Lalaine; Lagu, Amit; Palmer, Ralph Curtis, III; Savoy, April; Surabattula, Deepti; Vaitkunas, Samantha

    2007-01-01

    A comprehensive review of the literature and historical background of NASA established a need for an easy-to-implement technological improvement to displaying procedures which is cost effective and risk reducing. Previous unsuccessful attempts have led this team to explore the practicality of using a mobile handheld device. The major products, inputs, resources, constraints, planning and effort required for consideration of this type of solution were outlined. After analyzing the physical, environmental, life-cycle, functional, and socio-technical requirements, a Functional Analysis was performed to describe the top-level, second-level, and third-level functions of the system requirements. In addition, the risk/value proposition of conversion to a new technology was considered and gave a blueprint for transitioning along with the tasks necessary to implement the device into the Vehicle Assembly Building's (VAB) current infrastructure. A Work Breakdown Structure (WBS) described the elemental work items of the implementation. Once the viability of this system was confirmed, a device was selected through use of technical design comparison methods including the Pugh Matrix and House of Quality. Comparison and evaluation of the Apple iPhone, Motorola Q, Blackberry, PC Notebook, and PDA revealed that the iPhone is the most suitable device for this task. This paper outlines the device design/ architecture, as well as some of the required infrastructure.

  6. The 2018 Inter-agency field manual on reproductive health in humanitarian settings: revising the global standards.

    PubMed

    Foster, Angel M; Evans, Dabney P; Garcia, Melissa; Knaster, Sarah; Krause, Sandra; McGinn, Therese; Rich, Sarah; Shah, Meera; Tappis, Hannah; Wheeler, Erin

    2017-11-01

    Since the 1990s, the Inter-agency field manual on reproductive health in humanitarian settings (IAFM) has provided authoritative guidance on reproductive health service provision during different phases of complex humanitarian emergencies. In 2018, the Inter-Agency Working Group on Reproductive Health in Crises will release a new edition of this global resource. In this article, we describe the collaborative and inter-sectoral revision process and highlight major changes in the 2018 IAFM. Key revisions to the manual include repositioning unintended pregnancy prevention within and explicitly incorporating safe abortion care into the Minimum Initial Service Package (MISP) chapter, which outlines a set of priority activities to be implemented at the outset of a humanitarian crisis; stronger guidance on the transition from the MISP to comprehensive sexual and reproductive health services; and the addition of a logistics chapter. In addition, the IAFM now places greater and more consistent emphasis on human rights principles and obligations, gender-based violence, and the linkages between maternal and newborn health, and incorporates a diverse range of field examples. We conclude this article with an outline of plans for releasing the 2018 IAFM and facilitating uptake by those working in refugee, crisis, conflict, and emergency settings.

  7. Using Human Capital Planning to Predict Future Talent Needs

    ERIC Educational Resources Information Center

    Ruse, Donald; Jansen, Karen

    2008-01-01

    Human capital planning is an important tool in predicting future talent needs and sustaining organizational excellence over the long term. This article examines the concept of human capital planning and outlines how institutions can use HCP to identify the type and number of talent needed both now and in the future, recognize and prioritize talent…

  8. Strategic Plan for Indiana State University Libraries: 1987-1992.

    ERIC Educational Resources Information Center

    Ensor, Pat; And Others

    This task force report outlines a five-year strategic plan for the Indiana State University Library. The plan discusses expected changes and provides recommendations as to how to best meet new needs in eight areas: (1) the environment, including financial support, use of library resources, and changes in the composition of the user group; (2) user…

  9. A Planning Approach for Developing Inventory and Monitoring Programs In National Parks

    Treesearch

    David L. Peterson; David G. Silsbee; Daniel L. Schmoldt

    1995-01-01

    This document offers some conceptual ideas on how individual parks could plan and implement an Inventory and Monitoring (I&M) program. In several respects, the authors ideas parallel and complement the I&M project planning and development process outlined in the Natural Resources Inventory and Monitoring Guideline (NPS-75). However, no universal techniques...

  10. Strategic Plan to Ensure Racial and Ethnic Diversity in Connecticut Public Higher Education, 2006. Annual Report

    ERIC Educational Resources Information Center

    Connecticut Department of Higher Education (NJ1), 2006

    2006-01-01

    Increasing the participation of minority groups at public colleges and universities is a longstanding goal of the Board of Governors for Higher Education, as first outlined in its 1983 "Strategic Plan to Ensure Racial and Ethnic Diversity in Connecticut Public Higher Education." The minority groups defined by the plan are:…

  11. Family-Centered Early Intervention Visual Impairment Services through Matrix Session Planning

    ERIC Educational Resources Information Center

    Ely, Mindy S.; Gullifor, Kateri; Hollinshead, Tara

    2017-01-01

    Early intervention visual impairment services are built on a model that values family. Matrix session planning pulls together parent priorities, family routines, and identified strategies in a way that helps families and early intervention professionals outline a plan that can both highlight long-term goals and focus on what can be done today.…

  12. Strategies for Action: An Outline of Factors Which Influence Decisions on Program Plans.

    ERIC Educational Resources Information Center

    Bogue, E. G.

    This paper discusses strategies which can help the admissions officer/registrar be more effective in having his program plans transformed into reality. The program planning process is considered from three prospectives beginning with a brief discussion of the current state of program development in higher education. It is conjectured that the…

  13. How Will America Grow? A Citizen Guide to Land-Use Planning.

    ERIC Educational Resources Information Center

    Citizens Advisory Committee on Environmental Quality.

    Citizens are encouraged to learn about and become involved in land use and growth issues in their communities. Intended as a follow-up of an earlier report by the Committee's Task Force on Land Use and Urban Growth which outlined philosophical, legal, and policy aspects of land-use planning, the document suggests planning guidelines for citizen…

  14. Development of a Model for Planning an Educational Facility. [A] Practicum Report.

    ERIC Educational Resources Information Center

    Boughner, Wesley; And Others

    This publication is composed of two separate entities: a relatively brief manuscript entitled "Development of a Model for Planning an Educational Facility" and a much more lengthy Midi-Practicum Report that describes the implementation of the plans outlined in the first manuscript. Each of the three authors wrote one section of the first…

  15. Plan of study for the High Plains regional aquifer-system analysis in parts of Colorado, Kansas, Nebraska, New Mexico, Oklahoma, South Dakota, Texas, and Wyoming

    USGS Publications Warehouse

    Weeks, John B.

    1978-01-01

    The Ogallala Formation and associated Tertiary and Quarternary deposits form the principal aquifers supporting irrigation in the High Plains of Colorado, Kansas, Nebraska, New Mexico, Oklahoma, South Dakota, Texas, and Wyoming. The volume of water in storage within the aquifers is declining in most of the High Plains because water is being withdrawn in excess of the rate of replenishment. The U.S. Geological Survey has initiated a 5-year study of the High Plains aquifer system to develop the geohydrologic data base and computer models of the ground-water flow system needed to evaluate the response of the aquifer,system to ground-water management alternatives. This report describes the objectives, plan, and organization of the study and outlines the work to be accomplished in each state in the study area.

  16. Wind Powering America State Outreach. Final Technical Report: Washington State

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stearns, Tim

    2013-09-30

    The Washington Department of Commerce, via a U.S. Department of Energy grant, supported research into siting and permitting processes for wind projects by Skagit County, Washington. The goal was to help a local government understand key issues, consider how other areas have addressed wind siting, and establish a basis for enacting permitting and zoning ordinances that provided a more predictable permitting path and process for landowners, citizens, government and developers of small and community wind projects. The County?s contractor developed a report that looked at various approaches to wind siting, interviewed stakeholders, and examined technology options. The contractor outlined keymore » issues and recommended the adoption of a siting process. The Skagit County Commission considered the report and directed the Skagit County Planning & Development Services Department to add development of wind guidelines to its work plan for potential changes to development codes.« less

  17. Why a national high-risk insurance pool is not a workable alternative to the marketplace.

    PubMed

    Hall, Jean P

    2014-12-01

    The Pre-Existing Condition Insurance Plan (PCIP) was a national high-risk pool established under the Affordable Care Act (ACA) to provide coverage for individuals with preexisting conditions who had been uninsured for at least six months. It was intended to be a temporary program: PCIPs opened in 2010 and closed in April 2014. At that point, those with preexisting conditions could shop for health insurance in the marketplaces, where plans are prevented from using applicants' health status to deny coverage or charge more. This issue brief draws on the PCIP experience to outline why national high-risk pools, which continue to be proposed as policy alternatives to ACA coverage expansions, are expensive to enrollees as well as their administrators and ultimately unsustainable. The key lesson--and the principle on which the ACA is built--is that insurance works best when risk is evenly spread across a broad population.

  18. The Rosetta Science Archive: Status and Plans for Completing and Enhancing the Archive Content

    NASA Astrophysics Data System (ADS)

    Heather, D.; Barthelemy, M.; Fraga, D.; Grotheer, E.; O'Rourke, L.; Taylor, M.

    2017-09-01

    On 30 September 2016, Rosetta's signal flat-lined, confirming that the spacecraft had completed its incredible mission by landing on the surface of Comet 67P/Churyumov-Gerasimenko. Although this marked an end to the spacecraft's active operations, intensive work is still on-going with instrument teams preparing their final science data increments for delivery and ingestion into ESA's Planetary Science Archive (PSA). In addition to this, ESA is establishing contracts with a number of instrument teams to enhance and improve their data and documentation in an effort to provide the best long- term archive possible for the Rosetta mission. This presentation will outline the current status of the Rosetta archive, as well as highlighting some of the 'enhanced archiving' activities planned and underway with the various instrument teams on Rosetta to ensure the scientific legacy of the mission.

  19. The validation index: a new metric for validation of segmentation algorithms using two or more expert outlines with application to radiotherapy planning.

    PubMed

    Juneja, Prabhjot; Evans, Philp M; Harris, Emma J

    2013-08-01

    Validation is required to ensure automated segmentation algorithms are suitable for radiotherapy target definition. In the absence of true segmentation, algorithmic segmentation is validated against expert outlining of the region of interest. Multiple experts are used to overcome inter-expert variability. Several approaches have been studied in the literature, but the most appropriate approach to combine the information from multiple expert outlines, to give a single metric for validation, is unclear. None consider a metric that can be tailored to case-specific requirements in radiotherapy planning. Validation index (VI), a new validation metric which uses experts' level of agreement was developed. A control parameter was introduced for the validation of segmentations required for different radiotherapy scenarios: for targets close to organs-at-risk and for difficult to discern targets, where large variation between experts is expected. VI was evaluated using two simulated idealized cases and data from two clinical studies. VI was compared with the commonly used Dice similarity coefficient (DSCpair - wise) and found to be more sensitive than the DSCpair - wise to the changes in agreement between experts. VI was shown to be adaptable to specific radiotherapy planning scenarios.

  20. Using a concept map as a tool for strategic planning: The Healthy Brain Initiative.

    PubMed

    Anderson, Lynda A; Day, Kristine L; Vandenberg, Anna E

    2011-09-01

    Concept mapping is a tool to assist in strategic planning that allows planners to work through a sequence of phases to produce a conceptual framework. Although several studies describe how concept mapping is applied to various public health problems, the flexibility of the methods used in each phase of the process is often overlooked. If practitioners were more aware of the flexibility, more public health endeavors could benefit from using concept mapping as a tool for strategic planning. The objective of this article is to describe how the 6 concept-mapping phases originally outlined by William Trochim guided our strategic planning process and how we adjusted the specific methods in the first 2 phases to meet the specialized needs and requirements to create The Healthy Brain Initiative: A National Public Health Road Map to Maintaining Cognitive Health. In the first stage (phases 1 and 2 of concept mapping), we formed a steering committee, convened 4 work groups over a period of 3 months, and generated an initial set of 42 action items grounded in science. In the second stage (phases 3 and 4), we engaged stakeholders in sorting and rating the action items and constructed a series of concept maps. In the third and final stage (phases 5 and 6), we examined and refined the action items and generated a final concept map consisting of 44 action items. We then selected the top 10 action items, and in 2007, we published The Healthy Brain Initiative: A National Public Health Road Map to Maintaining Cognitive Health, which represents the strategic plan for The Healthy Brain Initiative.

  1. A Guide for Environmental Health Planning

    ERIC Educational Resources Information Center

    Crawford, Gene M.

    1972-01-01

    Outlines objectives and resources to be assessed in a community environmental health plan. Considers: water; liquid waste disposal; housing maintenance; solid waste disposal; air pollution; food and food protection; rodent control; insect control; migrant labor camps; recreation sites; mobile homes - trailer parks; schools, institutions - public…

  2. Guide Lines for Evaluation of Continuing Education Programs in Mental Health.

    ERIC Educational Resources Information Center

    Miller, Norma; And Others

    Suggestions for program administrators and training program directors to develop comprehensive plans based on principles of community involvement, education, administration and finance, and the disciplines being taught are broadly outlined. Three accompanying charts illustrate approach to evaluation planning. (NF)

  3. Administration Planning for Tomorrow.

    ERIC Educational Resources Information Center

    Murray, Albert

    After defining administrative planning and outlining deficits and gains of the past 20 years in American schooling, this address underlines the necessity for educational restructuring. Specifically, educational leaders need to: (1) gather data determining the status quo and suggest incremental improvements; (2) address new solvable challenges and…

  4. Profiles in Energy.

    ERIC Educational Resources Information Center

    National Council for Resource Development, Washington, DC.

    In order to assist two-year college educators in increasing their participation in energy-related activities, this publication provides guidelines for planning energy projects and descriptions of model energy programs. The steps outlined for program planning include the assessment of area energy resources, the identification of local…

  5. Activities in GPM Education and Public Outreach

    NASA Technical Reports Server (NTRS)

    Kirschbaum, Dalia

    2011-01-01

    This presentation will discuss the diverse and exciting activities planned for the GPM mission. I will present of our Education and Public Outreach (E/PO) strategy and will then outline our plans for some of the unique initiatives we are developing through this effort.

  6. 24 CFR 214.3 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... MORTGAGE AND LOAN INSURANCE PROGRAMS UNDER NATIONAL HOUSING ACT AND OTHER AUTHORITIES HOUSING COUNSELING... part: Action plan. A plan that outlines what the housing counseling agency and the client will do in...). Affiliate. A nonprofit organization participating in the HUD-related Housing Counseling program of a...

  7. 40 CFR 52.2470 - Identification of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...; Washington Administrative Code Chapter 173-430 (Burning of Field and Forage and Turf Grasses Grown for Seed...; Appendix G, Outline of Puget Sound Tropospheric Ozone Research Plan; and Appendix H, Prospective Vehicle... Households; Appendix H, Portland/Vancouver Carbon Monoxide Nonattainment Area Separation Documentation...

  8. Customized Training Marketing Plan.

    ERIC Educational Resources Information Center

    Lay, Ted

    This report outlines Oregon's Lane Community College's (LCC's) plan for marketing its customized training program for business, community organizations, public agencies, and their employees. Following a mission statement for the customized training program, a brief analysis is provided of the economic environment; of competition from educational…

  9. Strategic Information Systems Planning.

    ERIC Educational Resources Information Center

    Rowley, Jennifer

    1995-01-01

    Strategic Information Systems Planning (SISP) is the process of establishing a program for implementation and use of information systems in ways that will optimize effectiveness of information resources and use them to support the objectives of the organization. Basic steps in SISP methodology are outlined. (JKP)

  10. U.S. 75 Dallas, Texas, analysis plan.

    DOT National Transportation Integrated Search

    2010-02-01

    This AMS Analysis Plan for the U.S. 75 Pioneer Corridor outlines the various tasks associated with the application of the ICM AMS tools and strategies to the corridor, in support of a benefit-cost assessment of the proposed strategies. The report pro...

  11. Are nurses prepared for retirement?

    PubMed

    Blakeley, Judith; Ribeiro, Violeta

    2008-09-01

    This study explored various factors and income sources that registered nurses believe are important in retirement planning. In many countries worldwide, many registered nurses are approaching retirement age. This raises concerns related to the level of preparedness of retiring nurses. A mail-out questionnaire was sent to 200 randomly selected nurses aged 45 and older. SPSS descriptors were used to outline the data. Multiple t-tests were conducted to test for significant differences between selected responses by staff nurses and a group of nurse managers, educators and researchers. Of 124 respondents, 71% planned to retire by age 60. Only 24% had done a large amount of planning. The top four planning strategies identified were related to keeping healthy and active, both physically and mentally; a major financial planning strategy ranked fifth. Work pensions, a government pension and a personal savings plan were ranked as the top three retirement income sources. No significant differences were found between the staff nurse and manager groups on any of the items. IMPLICATIONS FOR NURSING MANAGERS/CONCLUSIONS: The results of this study suggest that managers' preparation for retirement is no different from that of staff nurses. All nurses may need to focus more on financial preparation, and begin the process early in their careers if they are to have a comfortable and healthy retirement. Nurse managers are in a position to advocate with senior management for early and comprehensive pre-retirement education for all nurses and to promote educational sessions among their staff. Managers may find the content of this paper helpful as they work with nurses to help them better prepare for retirement. This exploratory study adds to the limited amount of research available on the topic.

  12. Long-Range Plan for Technology in Elementary and Secondary Education in New York State. Using Technology To Pursue Excellence in Schools.

    ERIC Educational Resources Information Center

    New York State Education Dept., Albany. Office of Elementary and Secondary Education.

    The intent of this long-range plan is to provide direction for local, regional, and state level planning so that technology can be applied more effectively to enhance the teaching/learning environment and to improve the management of schools in the state of New York. The plan expands the statement of direction outlined in the "Statement of…

  13. Apollo experience report: Flight planning for manned space operations

    NASA Technical Reports Server (NTRS)

    Oneill, J. W.; Cotter, J. B.; Holloway, T. W.

    1972-01-01

    The history of flight planning for manned space missions is outlined, and descriptions and examples of the various evolutionary phases of flight data documents from Project Mercury to the Apollo Program are included. Emphasis is given to the Apollo flight plan. Time line format and content are discussed in relationship to the manner in which they are affected by the types of flight plans and various constraints.

  14. Oceanographic Remote Sensing; A Position Paper,

    DTIC Science & Technology

    1979-01-26

    The purpose of a Navy R&D remote sensing plan should be to set forth the requirements and direction of basic and exploratory research in satellite... remote sensing which supports the overall Navy oceanographic research and operational programs. The aim of the plan would be to outline the established...addressed. The plan should help serve as a single technology and program reference for implementation and planning of Navy related satellite remote

  15. Perceptions and Use of Technology to Support Older Adults with Multimorbidity.

    PubMed

    Murphy, Emma; Doyle, Julie; Hannigan, Caoimhe; Smith, Suzanne; Kuiper, Janneke; Jacobs, An; Hoogerwerf, Evert-Jan; Desideri, Lorenzo; Fiordelmondo, Valentina; Maluccelli, Lorenza; Brady, Anne-Marie; Dinsmore, John

    2017-01-01

    Digital technologies hold great potential to improve and advance home based integrated care for older people living with multiple chronic health conditions. In this paper, we present the results of a user requirement study for a planned digital integrated care system, based on the experiences and needs of key stakeholders. We present rich, multi-stakeholder, qualitative data on the perceptions and use of technology among older people with multiple chronic health conditions and their key support actors. We have outlined our future work for the design of the system, which will involve continuous stakeholder engagement through a user-centred co-design method.

  16. Eleventh Annual report of the Director of the United States Geological Survey, Part 2- Irrigation: 1889-1890

    USGS Publications Warehouse

    Powell, J.W.

    1891-01-01

    The work of the United States Irrigation Survey during the second year has been carried oil under the appropriation of $250,000 made March 2, 1889, by the force organized and equipped during the previous year. This is pursuant to the purposes outlined in the first annual report, which explains the origin, purpose, and plan of the Survey, publishes the instructions to the chiefs of the larger divisions, and gives the report of the topographic division to the end of the first fiscal year, and the reports of the hydrographic and engineering divisions during the greater part of the calendar year 1889.

  17. Writing a journal article: guidance for novice authors.

    PubMed

    Price, Bob

    2014-05-06

    This article focuses on writing for journal publication. The purpose of writing is explored, paying particular attention to the message to be conveyed and the readership to which that message is addressed.The process of drafting and revising an article for publication is outlined, after which attention is turned to the peer-review process, what peer reviewers are looking for in an article, and what might then be required of the author in redrafting the article to meet the expectations of the journal. Prospective authors are encouraged to research the journal to which they plan to submit their work, and to then target their writing to the readership of that publication.

  18. Update of the ACR-NEMA digital imaging and communications in medicine standard

    NASA Astrophysics Data System (ADS)

    Best, David E.; Horii, Steven C.; Bennett, William C.; Parisot, Charles R.

    1992-07-01

    The American College of Radiology and the National Electrical Manufacturers Association published the ACR-NEMA Digital Imaging and Communications Standard in 1985. Implementations are just now becoming available. Working groups of the committee have been very active. An expanded version of the Standard was published in 1988 and in a third version, to be known as Digital Imaging and Communications in Medicine (DICOM), is being prepared for publication in 1992. This paper briefly reviews the history of the Standard, describes the participation of the committee in international radiological imaging standards activities, and outlines the extensions planned for the DICOM Standard.

  19. Public Health and Climate Change Adaptation at the Federal Level: One Agency’s Response to Executive Order 13514

    PubMed Central

    Schramm, Paul J.; Luber, George

    2014-01-01

    Climate change will likely have adverse human health effects that require federal agency involvement in adaptation activities. In 2009, President Obama issued Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance. The order required federal agencies to develop and implement climate change adaptation plans. The Centers for Disease Control and Prevention (CDC), as part of a larger Department of Health and Human Services response to climate change, is developing such plans. We provide background on Executive Orders, outline tenets of climate change adaptation, discuss public health adaptation planning at both the Department of Health and Human Services and the CDC, and outline possible future CDC efforts. We also consider how these activities may be better integrated with other adaptation activities that manage emerging health threats posed by climate change. PMID:24432931

  20. Public health and climate change adaptation at the federal level: one agency's response to Executive Order 13514.

    PubMed

    Hess, Jeremy J; Schramm, Paul J; Luber, George

    2014-03-01

    Climate change will likely have adverse human health effects that require federal agency involvement in adaptation activities. In 2009, President Obama issued Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance. The order required federal agencies to develop and implement climate change adaptation plans. The Centers for Disease Control and Prevention (CDC), as part of a larger Department of Health and Human Services response to climate change, is developing such plans. We provide background on Executive Orders, outline tenets of climate change adaptation, discuss public health adaptation planning at both the Department of Health and Human Services and the CDC, and outline possible future CDC efforts. We also consider how these activities may be better integrated with other adaptation activities that manage emerging health threats posed by climate change.

  1. OUTLINE FOR OCCUPATIONAL HOME ECONOMICS COURSE IN COMMERCIAL AND INSTITUTIONAL FOOD PREPARATION.

    ERIC Educational Resources Information Center

    Alabama State Dept. of Education, Montgomery. Home Economics Service.

    THE EXPERIMENTAL OUTLINE IS FOR TEACHER USE IN PLANNING A TWO-SEMESTER COURSE TO PREPARE 11TH AND 12TH GRADE STUDENTS FOR ENTRY LEVEL COMMERCIAL FOOD PREPARATION JOBS SUCH AS FOOD SERVICE WORKERS, COOK HELPERS, CATERER HELPERS, SALAD MAKERS, BAKER HELPERS, SHORT ORDER COOKS, AND TRAY LINE WORKERS. IT WAS DEVELOPED BY VOCATIONAL HOME ECONOMICS…

  2. Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-08-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S and M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S and M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, andmore » the technical approach for the project. A companion document, the EFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of EFDP Facilities was initiated in FY 1994 and will be completed in FY 2000. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $51M. The costs are summarized. Upon completion of deactivation, annual S and M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year.« less

  3. Connected Vehicle Pilot Deployment Program phase 1 : performance measurement and evaluation support plan : Tampa (THEA) : final report.

    DOT National Transportation Integrated Search

    2016-03-14

    The Performance Measurement and Evaluation Support Plan for the Connected Vehicle Pilot Deployment Program Phase 1, Tampa Hillsborough Expressway Authority, outlines the goals and objectives for the Pilot as well as the proposed performance metrics. ...

  4. Macomb Community College Recruitment Plan, 1987-1988.

    ERIC Educational Resources Information Center

    Macomb County Community Coll., Warren, MI.

    Michigan's Macomb Community College's (MCC's) student recruitment plan outlines specific activities, timelines, and budgets to meet the institution's goals for college advancement and the instructional divisions' and service departments' goals and objectives for student recruitment. Section I offers a summary of MCC's market segmentation approach…

  5. Integrated corridor management I-15 San Diego, California : analysis plan.

    DOT National Transportation Integrated Search

    2010-02-01

    This AMS Analysis Plan for the I-15 Corridor outlines the various tasks associated with the application of the ICM AMS tools and strategies to this corridor in order to support benefit-cost assessment for the successful implementation of ICM. The rep...

  6. For Reluctant Readers.

    ERIC Educational Resources Information Center

    Fidell, Jeannette A.; Horn, Valerie

    The eleven lesson plans outlined in this booklet are designed to stimulate and challenge both underachievers and reluctant readers by helping them learn to read "The New York Times." The lesson plans include the following: exercises in vocabulary enrichment; exercises for developing dictionary skills; topics for oral reports; topics for…

  7. Planning Information Flow for the Small College.

    ERIC Educational Resources Information Center

    Zastrocky, Michael

    1986-01-01

    Information management has taken on more meaning for the small to medium-sized college and university in recent years. Advances in hardware and software have brought improved performances to campuses at a lower cost. Some of the planning methods used by Regis College are outlined. (MLW)

  8. The Carter Energy Plan

    ERIC Educational Resources Information Center

    Coan, Gene

    1977-01-01

    Plans for the implementation of a national energy policy are outlined. Proposed measures in the following areas are discussed: energy conservation; energy systems and rates; energy pricing and equity; coal, oil and gas production; nuclear and solar power; and industry structure and competition. Concerns of environmentalists are expressed. (AJ)

  9. Strengthening the Reading-Writing Connection: A Plan for Implementing Young Author's Conferences.

    ERIC Educational Resources Information Center

    Gorsuch, Sarah; Furnas, Judy

    1989-01-01

    Discusses how workshops for young authors help to cement the reading-writing connection for students and build their motivation and enthusiasm. Provides a step-by-step outline for educators who are interested in planning and implementing a young author's conference. (MG)

  10. An Experimental Model for Market Penetration.

    ERIC Educational Resources Information Center

    Caren, William L.

    1987-01-01

    A plan for college market penetration that has been successful in increasing the applicant pool for one institution is outlined and discussed. It includes development of performance objectives, a schedule, a promotional plan, market survey, and promotional activities including alumni, media, and other community resources. (MSE)

  11. A Practical Guide to Environmental Scanning: Approaches, Sources, and Selected Techniques.

    ERIC Educational Resources Information Center

    Clagett, Craig A.

    1989-01-01

    A guide to environmental scanning looks at its rationale and relationship to strategic planning, and outlines three administrative approaches: establishment of a committee, sponsoring a scanning conference or event, and assigning the task to the institutional research or planning office. (MSE)

  12. Intelligent transportation systems "ITS" : a strategic plan for the capitol region, executive summary

    DOT National Transportation Integrated Search

    1997-11-01

    The ITS Strategic Plan outlines a strategy for improving the efficiency of the Capitol Regions existing highway and transit systems. The Regions overall goal is to improve the efficiency and effectiveness of existing systems so as to reduce the...

  13. 3D simulation as a tool for improving the safety culture during remediation work at Andreeva Bay.

    PubMed

    Chizhov, K; Sneve, M K; Szőke, I; Mazur, I; Mark, N K; Kudrin, I; Shandala, N; Simakov, A; Smith, G M; Krasnoschekov, A; Kosnikov, A; Kemsky, I; Kryuchkov, V

    2014-12-01

    Andreeva Bay in northwest Russia hosts one of the former coastal technical bases of the Northern Fleet. Currently, this base is designated as the Andreeva Bay branch of Northwest Center for Radioactive Waste Management (SevRAO) and is a site of temporary storage (STS) for spent nuclear fuel (SNF) and other radiological waste generated during the operation and decommissioning of nuclear submarines and ships. According to an integrated expert evaluation, this site is the most dangerous nuclear facility in northwest Russia. Environmental rehabilitation of the site is currently in progress and is supported by strong international collaboration. This paper describes how the optimization principle (ALARA) has been adopted during the planning of remediation work at the Andreeva Bay STS and how Russian-Norwegian collaboration greatly contributed to ensuring the development and maintenance of a high level safety culture during this process. More specifically, this paper describes how integration of a system, specifically designed for improving the radiological safety of workers during the remediation work at Andreeva Bay, was developed in Russia. It also outlines the 3D radiological simulation and virtual reality based systems developed in Norway that have greatly facilitated effective implementation of the ALARA principle, through supporting radiological characterisation, work planning and optimization, decision making, communication between teams and with the authorities and training of field operators.

  14. [Introducing marketing strategies and techniques into the field of voluntary blood donation, to meet the rise in blood demand].

    PubMed

    Pesavento, S; Bégué, L

    2011-04-01

    Social marketing uses marketing principles and techniques to induce a target audience to voluntary accept, reject, change or abandon a behaviour for the benefit of individuals, groups, or society as a whole. Thus, individual or societal gain is the primary goal of social marketing. This kind of marketing is frequently used in the United States or in Canada in several fields such as healthcare, social work, or the environment. In 2008, we introduced these strategies and techniques in the field of blood donation in France. This article describes what has been achieved in the last three years and outlines the main steps in the social marketing planning process: analyzing the social marketing environment, defining target audiences and objectives, building and implementing strategies and action plans, evaluating and monitoring. On the way to self-sufficiency, while respecting donors, social marketing is additional to the work done by the blood collection staffs, communication teams, and volunteers. Social marketing is a complementary tool to the work done by the blood collection staff, communication teams and blood donation organizations and can help to meet the challenge of self-sufficiency while still allowing for the privacy and rights of donors. Copyright © 2011. Published by Elsevier SAS.

  15. Materials Division research and technology accomplishments for FY 87 and plans for FY 88

    NASA Technical Reports Server (NTRS)

    Brinkley, Kay L.

    1988-01-01

    The research program of the Materials Division is presented as FY 87 accomplishments and FY 88 plans. The accomplishments for each Branch are highlighted and plans are outlined. Publications of the Division are included by Branch. This material will be useful in program coordination with other government organizations, universities, and industries in areas of mutual interest.

  16. Planning for prescribed burning in the inland northwest.

    Treesearch

    Robert E. Martin; John D. Dell

    1978-01-01

    Fire has historically played a role in forests and ranges of the inland Northwest. This guide has been prepared to help managers understand the role of fire and the potential uses of fire and to plan for fire use in managing these lands. Sections deal with these topics, and steps in planning a prescribed burn are outlined. A sample burning situation illustrates the...

  17. Environmental Scan: A Summary of Key Issues Facing California Community Colleges Pertinent to the Strategic Planning Process

    ERIC Educational Resources Information Center

    Research and Planning Group for California Community Colleges (RP Group), 2005

    2005-01-01

    As part of the Statewide Strategic Planning Process for California Community Colleges, the Center for Student Success, the research and evaluation organization of the Research and Planning Group for California Community Colleges (RP/CSS) was asked to develop a series of overview documents that would outline both internal and external trends that…

  18. 78 FR 22281 - Notice of Intent To Collect Fees at the Henneberry House on Public Land in Beaverhead County...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-15

    ... local media. Fees would be collected as outlined in the field office's Fee Business Plan. The Henneberry... offset those ongoing costs. The BLM's mission for the Dillon Field Office Fee Business Plan (Project) is... addressed in the Dillon Field Office Recreation Fee Business Plan, prepared pursuant to the REA and BLM...

  19. Materials Division research and technology accomplishments for FY 89 and plans for FY 90

    NASA Technical Reports Server (NTRS)

    Brinkley, Kay L.

    1990-01-01

    The research program of the Materials Division is presented as FY-89 accomplishments and FY-90 plans. The accomplishments for each Branch are highlighted and plans are outlined. Publications of the Division are included by Branch. This material will be useful in program coordination with other government organizations, universities, and industries in areas of mutual interest.

  20. STATE OF WASHINGTON, STATE PLAN FOR TITLE 1, HIGHER EDUCATION ACT OF 1965. REVISED, JULY 1967.

    ERIC Educational Resources Information Center

    Washington State Planning and Community Affairs Agency, Olympia.

    THE STATE OF WASHINGTON PLAN FOR PARTICIPATION IN THE FEDERAL GRANT PROGRAM UNDER TITLE 1 OF THE HIGHER EDUCATION ACT OF 1965 OUTLINES THE ORGANIZATION AND THE ADMINISTRATIVE PROVISIONS OF THE PLANNING AND COMMUNITY AFFAIRS AGENCY (INTENDED AS THE SOLE TITLE 1 ADMINISTRATIVE BODY IN THE STATE), GUIDELINES FOR SELECTING COMMUNITY PROBLEMS OR…

  1. Forest management planning for timber production: a sequential approach

    Treesearch

    Krishna P. Rustagi

    1978-01-01

    Explicit forest management planning for timber production beyond the first few years at any time necessitates use of information which can best be described as suspect. The two-step approach outlined here concentrates on the planning strategy over the next few years without losing sight of the long-run productivity. Frequent updating of the long-range and short-range...

  2. Making the Most of What We Have Got: Enhancing the RADAR Repository to Support Research Planning

    ERIC Educational Resources Information Center

    Pike, Dawn; Siminson, Nicola Jane

    2017-01-01

    This article discusses how RADAR, the institutional repository (IR) at the Glasgow School of Art (GSA), has been modified to house an Annual Research Planning (ARP) template. A case study on the implementation of this research planning tool will outline the role that a repository and its staff can play in supporting individuals, enhancing…

  3. Hornby's principles of fire control planning

    Treesearch

    H. T. Gisborne

    1939-01-01

    On August 27, 1937, Lloyd G. Hornby died of heart failure on the Toboggan Creek forest fire in the Clearwater National Forest. Few if any men in or out of the U.S. Forest Service have made a greater contribution to fire control planning than did he. In the following article, H. T. Gisborne outlines the principles of fire control planning developed by Mr. Hornby,...

  4. MIS/TIS/IR Seven-Year, Long-Range Plan: Developed to Substantiate a Request for Title III SDIP Funds.

    ERIC Educational Resources Information Center

    Olagunju, Amos O.

    A seven-year master plan for Barber-Scotia College, which was needed to substantiate requests for federal grants for Strengthening Developing Institutions (SDIP) under the Title III program, is described. An outline for developing a long-range plan is also presented that features: college role, admission policies, enrollment, student recruitment,…

  5. Materials Division research and technical accomplishments for FY 1988 and plans for FY 1989

    NASA Technical Reports Server (NTRS)

    Brinkley, Kay L.

    1989-01-01

    The research program of the Materials Division is presented as FY-88 accomplishments and FY-89 plans. The accomplishments for each Branch are highlighted and plans are outlined. Publications of the Division are included by Branch. This material is useful in program coordination with other government organizations, universities, and industry in areas of mutual interest.

  6. Long-Range Plan for Gateway Technical Institute. 1982-1987: Serving Kenosha, Racine, and Walworth Counties.

    ERIC Educational Resources Information Center

    Stoehr, Keith W.; Covelli, Nicholas J.

    This report presents Gateway Technical Institute's long-range plan for 1982-1987. After prefatory material discussing financial and non-financial factors that may impinge on the plan, Chapter I outlines the socioeconomic situation in the three-county area of Wisconsin served by the college and introduces some of the critical issues that the…

  7. Improving supervision: a team approach.

    PubMed

    1993-01-01

    This issue of "The Family Planning Manager" outlines an interactive team supervision strategy as a means of improving family planning service quality and enabling staff to perform to their maximum potential. Such an approach to supervision requires a shift from a monitoring to a facilitative role. Because supervisory visits to the field are infrequent, the regional supervisor, clinic manager, and staff should form a team to share ongoing supervisory responsibilities. The team approach removes individual blame and builds consensus. An effective team is characterized by shared leadership roles, concrete work problems, mutual accountability, an emphasis on achieving team objectives, and problem resolution within the group. The team supervision process includes the following steps: prepare a visit plan and schedule; meet with the clinic manager and staff to explain how the visit will be conducted; supervise key activity areas (clinical, management, and personnel); conduct a problem-solving team meeting; conduct a debriefing meeting with the clinic manager; and prepare a report on the visit, including recommendations and follow-up plans. In Guatemala's Family Planning Unit, teams identify problem areas on the basis of agreement that a problem exists, belief that the problem can be solved with available resources, and individual willingness to accept responsibility for the specific actions identified to correct the problem.

  8. Tracking fuzzy borders using geodesic curves with application to liver segmentation on planning CT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yuan, Yading, E-mail: yading.yuan@mssm.edu; Chao, Ming; Sheu, Ren-Dih

    Purpose: This work aims to develop a robust and efficient method to track the fuzzy borders between liver and the abutted organs where automatic liver segmentation usually suffers, and to investigate its applications in automatic liver segmentation on noncontrast-enhanced planning computed tomography (CT) images. Methods: In order to track the fuzzy liver–chestwall and liver–heart borders where oversegmentation is often found, a starting point and an ending point were first identified on the coronal view images; the fuzzy border was then determined as a geodesic curve constructed by minimizing the gradient-weighted path length between these two points near the fuzzy border.more » The minimization of path length was numerically solved by fast-marching method. The resultant fuzzy borders were incorporated into the authors’ automatic segmentation scheme, in which the liver was initially estimated by a patient-specific adaptive thresholding and then refined by a geodesic active contour model. By using planning CT images of 15 liver patients treated with stereotactic body radiation therapy, the liver contours extracted by the proposed computerized scheme were compared with those manually delineated by a radiation oncologist. Results: The proposed automatic liver segmentation method yielded an average Dice similarity coefficient of 0.930 ± 0.015, whereas it was 0.912 ± 0.020 if the fuzzy border tracking was not used. The application of fuzzy border tracking was found to significantly improve the segmentation performance. The mean liver volume obtained by the proposed method was 1727 cm{sup 3}, whereas it was 1719 cm{sup 3} for manual-outlined volumes. The computer-generated liver volumes achieved excellent agreement with manual-outlined volumes with correlation coefficient of 0.98. Conclusions: The proposed method was shown to provide accurate segmentation for liver in the planning CT images where contrast agent is not applied. The authors’ results also clearly demonstrated that the application of tracking the fuzzy borders could significantly reduce contour leakage during active contour evolution.« less

  9. Transforming your professional self: encouraging lifelong personal and professional growth.

    PubMed

    Rodts, Mary F; Lamb, Karen V

    2008-01-01

    Transforming from student nurse to registered nurse is often discussed in a capstone class or a hospital orientation program. Changes in professional plans later in the career continuum often occur, but are not always planned. This article discusses the challenges of change, the need for career planning, stages of role acquisition, role socialization, and role transformation. In addition, it outlines the importance of creating a career plan to meet future career goals.

  10. Institutional plan. Fiscal year, 1997--2002

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-10-01

    The Institutional Plan is the culmination of Argonne`s annual planning cycle. The document outlines what Argonne National Laboratory (ANL) regards as the optimal development of programs and resources in the context of national research and development needs, the missions of the Department of Energy and Argonne National Laboratory, and pertinent resource constraints. It is the product of ANL`s internal planning process and extensive discussions with DOE managers. Strategic planning is important for all of Argonne`s programs, and coordination of planning for the entire institution is crucial. This Institutional Plan will increasingly reflect the planning initiatives that have recently been implemented.

  11. Guidelines for designing a digestive disease endoscopy unit: report of the World Endoscopy Organization.

    PubMed

    Mulder, Chris J J; Jacobs, Maarten A J M; Leicester, Roger J; Nageshwar Reddy, D; Shepherd, Libby E A; Axon, Anthony T; Waye, Jerome D

    2013-07-01

    A dedicated digestive disease endoscopy unit is structurally and functionally differentiating rapidly as a result of increasing diagnostic and therapeutic possibilities in the last 10-20 years. Publications with practical details are scarce, imposing a challenge in the construction of such a unit. The lack of authoritative information about endoscopy unit design means that architects produce their own design with or without consulting endoscopists working in such a unit. A working group of the World Endoscopy Organization discussed and outlined a practical approach fordesign and construction of a modern endoscopy unit. Designing the layout is extremely important, necessitating thoughtful planning to provide comfort to the endoscopy staff and patients, and efficient data archiving and transmission during endoscopic services. © 2013 The Authors. Digestive Endoscopy © 2013 Japan Gastroenterological Endoscopy Society.

  12. Description of a Website Resource for Turbulence Modeling Verification and Validation

    NASA Technical Reports Server (NTRS)

    Rumsey, Christopher L.; Smith, Brian R.; Huang, George P.

    2010-01-01

    The activities of the Turbulence Model Benchmarking Working Group - which is a subcommittee of the American Institute of Aeronautics and Astronautics (AIAA) Fluid Dynamics Technical Committee - are described. The group s main purpose is to establish a web-based repository for Reynolds-averaged Navier-Stokes turbulence model documentation, including verification and validation cases. This turbulence modeling resource has been established based on feedback from a survey on what is needed to achieve consistency and repeatability in turbulence model implementation and usage, and to document and disseminate information on new turbulence models or improvements to existing models. The various components of the website are described in detail: description of turbulence models, turbulence model readiness rating system, verification cases, validation cases, validation databases, and turbulence manufactured solutions. An outline of future plans of the working group is also provided.

  13. The MANIFEST prototyping design study

    NASA Astrophysics Data System (ADS)

    Lawrence, Jonathan S.; Ben-Ami, Sagi; Brown, David M.; Brown, Rebecca A.; Case, Scott; Chapman, Steve; Churilov, Vladimir; Colless, Matthew; Content, Robert; Depoy, Darren; Evans, Ian; Farrell, Tony; Goodwin, Michael; Jacoby, George; Klauser, Urs; Kuehn, Kyler; Lorente, Nuria P. F.; Mali, Slavko; Marshall, Jennifer; Muller, Rolf; Nichani, Vijay; Pai, Naveen; Prochaska, Travis; Saunders, Will; Schmidt, Luke; Shortridge, Keith; Staszak, Nicholas F.; Szentgyorgyi, Andrew; Tims, Julia; Vuong, Minh V.; Waller, Lewis G.; Zhelem, Ross

    2016-08-01

    MANIFEST is a facility multi-object fibre system for the Giant Magellan Telescope, which uses `Starbug' fibre positioning robots. MANIFEST, when coupled to the telescope's planned seeing-limited instruments, GMACS, and G-CLEF, offers access to: larger fields of view; higher multiplex gains; versatile reformatting of the focal plane via IFUs; image-slicers; and in some cases higher spatial and spectral resolution. The Prototyping Design Study phase for MANIFEST, nearing completion, has focused on developing a working prototype of a Starbugs system, called TAIPAN, for the UK Schmidt Telescope, which will conduct a stellar and galaxy survey of the Southern sky. The Prototyping Design Study has also included work on the GMT instrument interfaces. In this paper, we outline the instrument design features of TAIPAN, highlight the modifications that will be necessary for the MANIFEST implementation, and provide an update on the MANIFEST/instrument interfaces.

  14. "XMM/RXTE Observations of GX 339-4"

    NASA Technical Reports Server (NTRS)

    Nowak, M. A.; Corbel, S.; Fender, R.; Wilms, J.; Kuster, M.; Bailyn, C.; Coppi, P.

    2005-01-01

    In March 2003, we performed two simultaneous XMM/RXTE observations of the black hole candidate GX 339-4. Our goal is to compare these data to our prior simultaneous RXTE/ASCA observations (Nowak, Wilms & Dove, 2002). These observations were carried out in timing mode, as opposed to burst mode, and are more complex to analyze than we expected. Specifically, the data suffered from a number of telemetry dropouts (in fact, the standard archive processing failed on these data, and more than a year passed from the time of the observations before the data was delivered to us). Furthermore, the core of the EPIC PSF suffers slightly from pileup and gain shifts. We continue to work on this data, however, and anticipate publishing it within the next academic year. Here we highlight our ongoing work and outline our plans for publication.

  15. Reflection a neglected art in health promotion.

    PubMed

    Fleming, Paul

    2007-10-01

    Evaluation and quality assurance have, over time, become the bedrock of health promotion practice in ensuring effectiveness and efficiency of programme planning and delivery. There has been less emphasis, however, on formal recognition of the contribution of the personal characteristics and perspectives of those who plan and deliver programmes and to the more subtle underlying effects of prevailing societal and professional norms. This paper seeks to highlight the neglect of formal reflection as a key professional skill in professional health promotion practice. It outlines key theories underpinning the development of the concepts of reflection and reflective practice. The role of reflection in critical health education as it contributes to critical consciousness raising is highlighted through its contribution to the empowerment of change agents in a societal change context. A conceptual typology of reflective practice is described which provides a flexible structure with which professionals can reflect on the role of self, the context and the process of health promotion programme planning. Its use is illustrated from the author's published work in health promotion which is related to prevention of workplace violence.

  16. A Hierarchical Multiple-Level Approach to the Assessment of Interpersonal Relatedness and Self-Definition: Implications for Research, Clinical Practice, and DSM Planning.

    PubMed

    Luyten, Patrick; Blatt, Sidney J

    2016-01-01

    Extant research suggests there is considerable overlap between so-called 2-polarities models of personality development; that is, models that propose that personality development evolves through a dialectic synergistic interaction between 2 key developmental tasks across the life span-the development of self-definition on the one hand and of relatedness on the other. These models have attracted considerable research attention and play a central role in DSM planning. This article provides a researcher- and clinician-friendly guide to the assessment of these personality theories. We argue that current theoretical models focus on issues of relatedness and self-definition at different hierarchically organized levels of analysis; that is (a) at the level of broad personality features, (b) at the motivational level (i.e., the motivational processes underlying the development of these dimensions), and (c) at the level of underlying internal working models or cognitive affective schemas, and the specific interpersonal features and problems in which they are expressed. Implications for further research and DSM planning are outlined.

  17. So you think you've designed an effective recruitment protocol?

    PubMed

    Green, Cara; Vandall-Walker, Virginia

    2017-03-22

    Background Recruiting acutely ill patients to participate in research can be challenging. This paper outlines the difficulties the first author encountered in a study and the steps she took to overcome problems with research ethics, gain access to participants and implement a recruitment protocol in multiple hospitals. It also compares these steps with literature related to recruitment. Aim To inform and inspire neophyte researchers about the need for planning and resilience when dealing with recruitment challenges in multiple hospitals. Discussion The multiple enablers and barriers to the successful implementation of a hospital-based study recruitment protocol are explored based on a neophyte researcher's optimistic assumptions about this stage of the study. Conclusions Perseverance, adequately planning for contingencies, and accepting the barriers and challenges to recruitment are essential for completing one's research study and ensuring fulfilment as a researcher. Implications for practice Healthcare students carrying out research require adequate knowledge about conducting hospital-based, patient research to inform their recruitment plan. Maximising control over recruitment, allowing for adequate time to conduct data collection, and maintaining a good work ethic will help to ensure success.

  18. Advanced crew procedures development techniques: Procedures and performance program training plan

    NASA Technical Reports Server (NTRS)

    Arbet, J. D.; Benbow, R. L.

    1975-01-01

    A plan developed to support the training of PPP users in the operations associated with PPP usage is described. This document contains an overview of the contents of each training session and a detailed outline to be used as the guideline for each session.

  19. Responding to Community Needs.

    ERIC Educational Resources Information Center

    Salinas, Alicia M.

    This paper outlines the development process of a Comprehensive Education Plan (CEP) for one Texas school district. The Center for the Management of Innovation in Multicultural Education (MIME) is assisting the Edcouch-Elsa Independent School District to develop a comprehensive plan that will answer the whole community's educational needs. The…

  20. Mississippi Curriculum Framework for Family Dynamics. Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for family dynamics. The course uses skills in critical thinking, decision…

  1. American Samoa: Energy Action Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ness, J. Erik; Haase, Scott; Conrad, Misty

    2016-09-01

    This document outlines actions being taken to reduce American Samoa's petroleum consumption. It describes the four near-term strategies selected by the American Samoa Renewable Energy Committee during action-planning workshops conducted in May 2016, and describes the steps that will need to be taken to implement those strategies.

  2. Science Facilities for Mississippi Schools, Grades 1-12.

    ERIC Educational Resources Information Center

    Mississippi State Dept. of Education, Jackson. Div. of Instruction.

    Prepared to assist those planning the construction of new science facilities on the elementary, intermediate, or secondary school level. Standards are outlined and specifications detailed. A statement of fifteen general pricniples for planning science facilities in secondary schools precedes a discussion of--(1) special facilities for different…

  3. NASA Education Implementation Plan 2015-2017

    ERIC Educational Resources Information Center

    National Aeronautics and Space Administration, 2015

    2015-01-01

    The NASA Education Implementation Plan (NEIP) provides an understanding of the role of NASA in advancing the nation's STEM education and workforce pipeline. The document outlines the roles and responsibilities that NASA Education has in approaching and achieving the agency's and administration's strategic goals in STEM Education. The specific…

  4. Adaptation workbook: Chapter 3

    Treesearch

    Maria Janowiak; Patricia Butler; Chris Swanston; Linda Parker; Matt St. Pierre; Leslie Brandt

    2012-01-01

    Climate change imposes many challenges on the long-term management of ecosystems and is becoming an increasingly important consideration in land management planning and decisionmaking at a variety of spatial scales. The process outlined in this chapter helps managers incorporate climate change considerations into management planning and activities, while complementing...

  5. A Layman's Guide to Understanding TSA Compliance.

    ERIC Educational Resources Information Center

    Alioto, Nicholas C. A.; Simandl, Robert J.

    1998-01-01

    Since school district business offices are ill-equipped to administer tax shelter annuity (TSA) plans, the result has been inadequate legal compliance and significant financial exposure. This article explains the rules governing TSA planning (testing limitations), examines common pitfalls for districts conducting audits, and outlines steps for…

  6. Expansion: A Plan for Success.

    ERIC Educational Resources Information Center

    Callahan, A.P.

    This report provides selling brokers' guidelines for the successful expansion of their operations outlining a basic method of preparing an expansion plan. Topic headings are: The Pitfalls of Expansion (The Language of Business, Timely Financial Reporting, Regulatory Agencies of Government, Preoccupation with the Facade of Business, A Business Is a…

  7. Scoliosis Screening in Schools.

    ERIC Educational Resources Information Center

    New York State Education Dept., Albany. Div. of Pupil Personnel Services.

    The booklet outlines New York state school policy and procedures for screening students for scoliosis, lateral curvature of the spine. It is explained that screening is designed to discover spinal deformities early enough to prevent surgery. Planning aspects, including organizing a planning team for the school district, are discussed. Among…

  8. Crisis Prevention and Response: Is Your School Prepared?

    ERIC Educational Resources Information Center

    Paine, Cathy; Sprague, Jeffrey

    1999-01-01

    This bulletin outlines the major components of a crisis-preparedness and response plan for schools. It lists the critical components of a safe-school plan, such as community coordination, curriculum, proactive student discipline policies and procedures, safe physical environment, school security, staff and student training, evaluation and…

  9. Observation Skills - Tuning Up the Five Senses.

    ERIC Educational Resources Information Center

    Mason, Fred J.

    Lesson plans designed to increase the observation skills for intermediate elementary students and provide them with a variety of sensory experiences in learning situations are presented in this document. Lesson plans include objectives, outlines for both indoor and outdoor learning experiences, materials and equipment needed, and evaluation…

  10. AI Techniques for Space: The APSI Approach

    NASA Astrophysics Data System (ADS)

    Steel, R.; Niézette, M.; Cesta, A.; Verfaille, G., Lavagna, M.; Donati, A.

    2009-05-01

    This paper will outline the framework and tools developed under the Advanced Planning and Schedule Initiative (APSI) study performed by VEGA for the European Space Agency in collaboration with three academic institutions, ISTC-CNR, ONERA, and Politecnico di Milano. We will start by illustrating the background history to APSI and why it was needed, giving a brief summary of all the partners within the project and the rolls they played within it. We will then take a closer look at what APSI actually consists of, showing the techniques that were used and detailing the framework that was developed within the scope of the project. We will follow this with an elaboration on the three demonstration test scenarios that have been developed as part of the project, illustrating the re-use and synergies between the three cases along the way. We will finally conclude with a summary of some pros and cons of the approach devised during the project and outline future directions to be further investigated and expanded on within the context of the work performed within the project.

  11. A plan for application system verification tests: The value of improved meteorological information, volume 1. [economic consequences of improved meteorological information

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The framework within which the Applications Systems Verification Tests (ASVTs) are performed and the economic consequences of improved meteorological information demonstrated is described. This framework considers the impact of improved information on decision processes, the data needs to demonstrate the economic impact of the improved information, the data availability, the methodology for determining and analyzing the collected data and demonstrating the economic impact of the improved information, and the possible methods of data collection. Three ASVTs are considered and program outlines and plans are developed for performing experiments to demonstrate the economic consequences of improved meteorological information. The ASVTs are concerned with the citrus crop in Florida, the cotton crop in Mississippi and a group of diverse crops in Oregon. The program outlines and plans include schedules, manpower estimates and funding requirements.

  12. Planning for a Global Lingua Franca: Challenges for Feminist Language Planning in English(es) around the World

    ERIC Educational Resources Information Center

    Pauwels, Anne

    2011-01-01

    In this paper I outline the challenges for feminist language planning in the context of a global lingua franca--English. Drawing upon the views of speakers of "World Englishes" I discuss their reactions as well as reported practices in relation to gender-inclusive language use. This reveals the complexities of managing the tension between the…

  13. Department of Defense Civilian Human Resources Strategic Plan

    DTIC Science & Technology

    2005-04-01

    the strategic plan. A balanced scorecard approach was used to build the strategic plan. The balanced scorecard is a strategic management tool that...in the balanced scorecard format. Details of how the balanced scorecard addresses the DoD Human Capital Initiative are outlined in the Office of...mission- ready civilian workforce 8 GOALS AND OBJECTIVES The balanced scorecard approach reflects the changes the Department is undergoing and

  14. 14 CFR Appendix B to Part 415 - Safety Review Document Outline

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ....0Flight Safety (§ 415.115) 4.1Initial Flight Safety Analysis 4.1.1Flight Safety Sub-Analyses, Methods, and... Analysis Data 4.2Radionuclide Data (where applicable) 4.3Flight Safety Plan 4.3.1Flight Safety Personnel 4... Safety (§ 415.117) 5.1Ground Safety Analysis Report 5.2Ground Safety Plan 6.0Launch Plans (§ 415.119 and...

  15. 14 CFR Appendix B to Part 415 - Safety Review Document Outline

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ....0Flight Safety (§ 415.115) 4.1Initial Flight Safety Analysis 4.1.1Flight Safety Sub-Analyses, Methods, and... Analysis Data 4.2Radionuclide Data (where applicable) 4.3Flight Safety Plan 4.3.1Flight Safety Personnel 4... Safety (§ 415.117) 5.1Ground Safety Analysis Report 5.2Ground Safety Plan 6.0Launch Plans (§ 415.119 and...

  16. North American Plan for Avian and Pandemic Influenza

    DTIC Science & Technology

    2007-08-01

    broiler and turkey flocks ( meat -type birds); • Commercial duck and goose meat -type production flocks; • Pullet production flocks; • Commercial...services, public health measures and communications. Notifiable Avian Influenza Hazard Specific Plan. This plan outlines the response to be undertaken by...terme_compartiment) • Broiler, turkey or layer breeder production flocks; • Duck breeder and upland game breeder flocks; • Commercial (grow out

  17. Master Plan: The Introduction of Computer Science and Computer Related Instructional Programs, 1982-1985. Office of Instruction Publication Report No. 82-07.

    ERIC Educational Resources Information Center

    Veley, Victor F.; And Others

    This report presents a master plan for the development of computer science and computer-related programs at Los Angeles Trade-Technical College for 1982 through 1985. Introductory material outlines the main elements of the plan: to analyze existing computer courses, to create new courses in Laser Technology, Genetic Engineering, and Robotics; and…

  18. Assessing Changes in Job Behavior Due to Training: A Guide to the Participant Action Plan Approach.

    ERIC Educational Resources Information Center

    Office of Personnel Management, Washington, DC.

    This guide provides a brief introduction to the Participant Action Plan Approach (PAPA) and a user's handbook. Part I outlines five steps of PAPA which determine how job behavior is changed by training course or program participation. Part II, the manual, is arranged by the five steps of the PAPA approach. Planning for PAPA discusses making…

  19. Remote Sensing for Inland Water Quality Monitoring: A U.S. Army Corps of Engineers Perspective

    DTIC Science & Technology

    2011-10-01

    outlined in Water Quality Management Plans , including traditional field sampling (water, sediment, and biological) and measure- ment of physical...at one time, a more comprehen- sive historical record or trend analysis, a planning tool for prioritizing field surveying and sampling, and accurate...estimations of optically active constituents used to characterize water quality. Furthermore, when utilized in water quality management planning

  20. Examples of Lesson Plans in Elementary Subjects for Adults. Content Materials in Education for Adult Responsibilities. California Adult Basic Education.

    ERIC Educational Resources Information Center

    California State Dept. of Education, Sacramento. Bureau of Adult Education.

    Lesson plans prepared by Adult Basic Education teachers who attended one-day mini-workshops and the participants of a six-session course held at the University of Southern California are presented. The plans are in outline format. The content areas covered are: Consumer Education (Buying Foods, Bank Checking Accounts, Telephone and Directory,…

  1. Community Involved Master Planning of Local Education. New Hampshire Plans, Career Education 1978-83. Volume 2 of 4 Volumes.

    ERIC Educational Resources Information Center

    New Hampshire State Dept. of Education, Concord.

    This guide is designed as an outline of the means to broaden the context of education within a community and to serve its needs through community involvement in educational program planning. Part 1 is a discussion of the need and means for community collaboration, including maximizing use of existing educational facilities and community resources…

  2. NCVER's Strategic Plan: 2017-20

    ERIC Educational Resources Information Center

    National Centre for Vocational Education Research (NCVER), 2017

    2017-01-01

    NCVER's latest strategic plan outlines the vision and mission, and 7 strategic objectives and interrelated actions, that will direct company activities for the next 3 years. It also details the values that underpin our culture, our commitment to quality and integrity, measures of success against the objectives, and principles of practice and…

  3. Technology Transfer Educational Curriculum Plan for the State of Colorado.

    ERIC Educational Resources Information Center

    Dakin, Karl J.

    A recommended plan for an educational curriculum on the topic of technology transfer is outlined. A survey was conducted to determine the current levels of ability and knowledge of technology users and of transfer intermediaries. Information was collected from three sources: individuals and organizations currently presenting educational programs…

  4. The Role of Education in Latin American Librarianship.

    ERIC Educational Resources Information Center

    Whitmore, Marilyn

    1978-01-01

    A brief historical review of educational development and assessment of present needs is followed by an outline of necessary considerations for future educational planning and discussion of the role of Latin American librarianship in planning for library development. An active role is prescribed for librarians, both individually and collectively.…

  5. Problems for a Sign Language Planning Agency

    ERIC Educational Resources Information Center

    Covington, Virginia

    1977-01-01

    American Sign Language is chiefly untaught and nonstandardized. The Communicative Skills Program of the National Association of the Deaf aims to provide sign language classes for hearing personnel and to increase interpreting services. Programs, funding and aims of the Program are outlined. A government sign language planning agency is proposed.…

  6. Information planning for the 1980's and 1990's.

    PubMed

    Flanagan, J B; Peterson, R C; Surnamer, J

    1984-07-01

    With the shift in reimbursement, new medical technology, and increased competition, hospitals must be managed more effectively. Management information systems are being developed to meet these new challenges. This article provides an overview of the types of information needed and outlines the development of a comprehensive information systems plan.

  7. Your International Business Plan. A Workbook.

    ERIC Educational Resources Information Center

    Otis, John W., Comp.

    Designed for firms who are seriously interested in expanding their business into international trade and who want to evaluate their prospects and potential for success, this workbook guides the reader through the steps in preparing an international business plan. Introductory sections explain how to use the workbook, offer a summary outline of an…

  8. Human Self-Development: Our Moral Heritage.

    ERIC Educational Resources Information Center

    Department of the Army, Washington, DC.

    An instructor's guide and lesson plans for classroom instruction of women in the Army's Human Self-Development Program are provided. The topic of this pamphlet is "Our Moral Heritage." Each of the six chapters of the guide have the same format, as follows: Outline, Instructor's Resource Material, Lesson Plan, and Instructional Aids. The…

  9. Health Sciences Planning.

    ERIC Educational Resources Information Center

    Nelson, Arthur D.

    "How will recent health care trends affect health sciences campus planning?" was the question put forth by Dr. Nelson at the Society of College and University Planners conference, August 12, 1970. He outlined the status of health care in this country, including the financial state of medical affairs, particularly for university health sciences…

  10. From Training to Learning in Enterprise Resource Planning Systems

    ERIC Educational Resources Information Center

    Kerr, Don; Murray, Peter A.; Burgess, Kevin

    2012-01-01

    The information systems' literature outlines how training is a critical factor to successful Enterprise Resource Planning (ERP) implementations. Yet, types of training are not discussed in the literature and there is little indication if existing training is effective and whether relevant contextual factors have been considered. Without…

  11. Designing Successful Professional Meetings and Conferences in Education: Planning, Implementation, and Evaluation.

    ERIC Educational Resources Information Center

    Mundry, Susan; Britton, Edward; Raizen, Senta; Loucks-Horsley, Susan

    This book outlines the principles of planning, implementing, and evaluating successful professional meetings and conferences in education. The following are among the topics discussed: (1) the knowledge base of effective meetings and conferences (nine principles held by effective meeting designers; characteristics of effective meetings and…

  12. Ecological Planning for Farmlands Preservation: A Sourcebook for Educators and Planners.

    ERIC Educational Resources Information Center

    Steiner, Frederick

    Intended to provide an overview of ecological planning for educators and other interested citizens, this sourcebook outlines efforts to preserve agricultural land in Whitman County, Washington. How Whitman County established its agricultural lands policy is described, followed by an explanation of the land classification procedure. Also presented…

  13. School District Information Technology Disaster Recovery Planning: An Explanatory Case Study

    ERIC Educational Resources Information Center

    Gray, Shaun L.

    2017-01-01

    Despite research and practitioner articles outlining the importance information technology disaster plans (ITDRPs) to organizational success, barriers have impeded the process of disaster preparation for Burlington County New Jersey school districts. The purpose of this explanatory qualitative case study was to understand how technology leader…

  14. Planning and Facilitating Debriefs of Experiential Learning Activities in Skills-Based Health Education

    ERIC Educational Resources Information Center

    Johns, Judith A.; Moyer, Matthew T.; Gasque, Lisa M.

    2017-01-01

    Purpose: This paper highlights the importance of conducting structured, student-centered discussions, known as debriefs, following experiential learning activities in health education. Drawing upon Kolb's experiential learning theory and literature from scholars in simulation-based training, the authors outline key considerations for planning and…

  15. Mississippi Curriculum Framework for Electrician (Program CIP: 46.0302--Electrician). Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for secondary-level courses to prepare Mississippi vocational students for…

  16. Language Planning and Language Policy in Australia.

    ERIC Educational Resources Information Center

    Liddicoat, Anthony, Ed.

    1991-01-01

    A five-year period of particular activity in Australian language policy and language planning culminated with the 1991 publication of the White Paper called Australia's Language, which outlines proposed government programs in languages until 1994. Many of the papers in this theme issue of the journal of the Applied Linguistics Association of…

  17. Safety Standards Plan for Middlesex County Vocational & Technical High Schools.

    ERIC Educational Resources Information Center

    Sommer, Cy

    This vocational education safety standards plan outlines rules and regulations adopted by the Board of Education of Middlesex County Vocational and Technical High Schools. The first of eleven chapters presents demographics and a safety organization table for Middlesex County Vocational and Technical Schools. In chapter 2, six safety program…

  18. Appendix X. ComField Information Management System.

    ERIC Educational Resources Information Center

    Coffin, Robert W.

    This appendix outlines the ComField information management system which is designed to give the project management a comprehensive tool for decisionmaking and to free instructors from tasks of keeping current records of every student's performance, help them plan their time more efficiently for counseling students and planning instruction, and…

  19. Plan for Progress in the Media Center.

    ERIC Educational Resources Information Center

    Iowa State Dept. of Public Instruction, Des Moines.

    The outpouring of new instructional materials and techniques has resulted in a demand for instructional materials centers at the elementary school level. This handbook has been published to assist in planning and developing such a facility. The media center's usefullness to students, teachers, and administrators is outlined. The qualifications and…

  20. A Business Plan Outline.

    ERIC Educational Resources Information Center

    Kirchner, Charles, Ed.

    This document identifies the information that should be included in a business plan, and in what order, to make it an effective management tool and an effective tool to communicate a proposed or existing company's strengths and potential to potential financiers. Following an introduction, the document explains the following sections of a business…

  1. How to Plan and Implement a Workshop.

    ERIC Educational Resources Information Center

    Howell, Jacquie

    These guidelines were developed to assist school administrators who have the responsibility of organizing a one- to three-day professional development program. The first section outlines the tasks involved in planning and implementing a workshop. The remaining sections cover the following: (1) developing and utilizing the workshop theme; (2)…

  2. Affirmative Action Employment Plan. Revised.

    ERIC Educational Resources Information Center

    Oakland Unified School District, CA.

    This is the affirmative action employment plan adopted by the Board of Education of the Oakland Unified School District, Oakland, California. A statement of school district policy and goals is provided. Responsibilities of the school district administrators and the Affirmative Action Advisory Committee are also outlined. Steps to be taken to…

  3. The Future of Tennessee: Higher Education 1987-1993.

    ERIC Educational Resources Information Center

    Tennessee Higher Education Commission, Nashville.

    This master plan for higher education in Tennessee sketches a framework for the continued improvement of postsecondary institutions and emphasizes the critical links between higher education and other components of the state. A set of principles and achievement targets undergirding the master plan are outlined. Specific action is called for in…

  4. A Marketing Plan for Recruiting Students into Pharmacy School-based Graduate Programs. A Report.

    ERIC Educational Resources Information Center

    Holdford, David A.; Stratton, Timothy P.

    2000-01-01

    Outlines a marketing plan for recruiting students into pharmacy school-based graduate programs, particularly into social and administrative sciences. Addresses challenges and opportunities when recruiting, the need to clearly define the "product" that graduate programs are trying to sell to potential students, types of students…

  5. Forward Plan for Health

    ERIC Educational Resources Information Center

    Graham, Robert

    1976-01-01

    The forward plan for health for 1978-1982 represents the Public Health Service's view of the health world for the next five-year period. Six main themes are outlined: knowledge development; prevention of illness; improving the health-care system; assuring the quality of health care; health-care financing; and tracking and evaluation. (LBH)

  6. Testimony: Writing Cooperatively.

    ERIC Educational Resources Information Center

    Sasser, Linda; Cromwell, Carole

    A lesson plan and supportive materials for an exercise in reading comprehension and cooperative writing are presented. The exercise is based on a story entitled "Testimony," in which a writer expresses feelings about a boxing match. The lesson plan outlines procedures for presentation of the exercise to the class, for the cooperative teams to…

  7. Transportation Technology Curriculum Materials FY 90. Illinois Plan for Industrial Technology Education.

    ERIC Educational Resources Information Center

    Gallo, Dennis; And Others

    This packet contains technology-based learning activities for the transportation technology course at the orientation level (grades 9 and 10) of the Illinois Plan for Industrial Technology Education curriculum project. The packet includes a course rationale, mission, description, and course outline. Suggested learning objectives and suggested…

  8. Research Plan: Compensatory Education Study.

    ERIC Educational Resources Information Center

    National Inst. of Education (DHEW), Washington, DC.

    This research plan is a direct response to the education Amendments of 1974 which instructs the National Institute of Education to design and conduct a compensatory education study. The research design, as outlined in this report, intends to examine programs and look for identifiable factors in funding, organization, and instructional methods…

  9. Planning Report, 2007-2011

    ERIC Educational Resources Information Center

    Nevada System of Higher Education, 2011

    2011-01-01

    This report is prepared in accordance to state law requiring the Nevada System of Higher Education (NSHE) to prepare a biennial report for submission to the Nevada State Legislature that outlines a plan for new programs and expansions of existing programs of instruction, public service and research. This report highlights the strategic objectives…

  10. Institutional Effectiveness: A Model for Planning, Assessment & Validation.

    ERIC Educational Resources Information Center

    Truckee Meadows Community Coll., Sparks, NV.

    The report presents Truckee Meadows Community College's (Colorado) model for assessing institutional effectiveness and validating the College's mission and vision, and the strategic plan for carrying out the institutional effectiveness model. It also outlines strategic goals for the years 1999-2001. From the system-wide directive that education…

  11. How School Principals Can Foster Effective Literacy Instruction: A Ten-Step Plan

    ERIC Educational Resources Information Center

    Hinchman, Kathleen A.

    2009-01-01

    School principals can foster effective literacy instruction by orchestrating community collaboration in an ongoing cycle of literacy program development, implementation, evaluation, and revision outlined in this ten-step plan. The steps address forming a community advisory board, appointing a building literacy leader, forming a literacy team,…

  12. Fire Officer I Lesson Plans.

    ERIC Educational Resources Information Center

    Pribyl, Paul F.

    Lesson plans are provided for the Fire Officer I course. Material for each lesson is presented in this format: course title, lesson title, equipment required, training aids needed, and a content outline which details teaching points and related instructor references. These references, or suggested readings, are listed at the conclusion of each…

  13. The Role of Communications in Population and Family Planning Programs.

    ERIC Educational Resources Information Center

    Sweeney, William O.

    In this paper, the author outlines the historical development of information and education programs for population control and family planning, arguing that communications activities should receive as much emphasis as the health services program. The public information aspect includes use of mass media, advertising and promotion, public relations…

  14. Monitoring and Assuring the Quality of Digital Aerial Data

    NASA Technical Reports Server (NTRS)

    Christopherson, Jon

    2007-01-01

    This viewgraph presentation explains the USGS plan for monitoring and assuring the quality of digital aerial data. The contents include: 1) History of USGS Aerial Imaging Involvement; 2) USGS Research and Results; 3) Outline of USGS Quality Assurance Plan; 4) Other areas of Interest; and 5) Summary

  15. Planning Report, 1999-2003.

    ERIC Educational Resources Information Center

    Nevada Univ. and Community Coll. System, Reno. Office of the Chancellor.

    This report, submitted by the Board of Regents of the University and Community College System of Nevada (UCCSN), outlines anticipated programs and expansion of existing programs, anticipated costs and resources, and other information concerning the comprehensive planning of the UCCSN for the next 4 years. The first section of the report includes…

  16. A Guide to Planning Your Retirement Finances. A Report by the Chairman of the Subcommittee on Retirement Income and Employment of the Select Committee on Aging. House of Representatives, One Hundred First Congress, First Session.

    ERIC Educational Resources Information Center

    Congress of the U.S., Washington, DC. House Select Committee on Aging.

    This committee print provides workers with a general overview of the steps involved in planning retirement income and encourages them to start laying down concrete financial plans now for their retirement years. It begins by outlining a framework for planning retirement finances. These specific steps are discussed: gathering information on current…

  17. Application of automatic vehicle location in law enforcement: An introductory planning guide

    NASA Technical Reports Server (NTRS)

    Hansen, G. R.; Leflang, W. G.

    1976-01-01

    A set of planning guidelines for the application of automatic vehicle location (AVL) to law enforcement is presented. Some essential characteristics and applications of AVL are outlined; systems in the operational or planning phases are discussed. Requirements analysis, system concept design, implementation planning, and performance and cost modeling are described and demonstrated with numerous examples. A detailed description of a typical law enforcement AVL system, and a list of vendor sources are given in appendixes.

  18. Patient and public involvement in the early stages of clinical trial development: a systematic cohort investigation

    PubMed Central

    Gamble, Carrol; Dudley, Louise; Allam, Alison; Bell, Philip; Goodare, Heather; Hanley, Bec; Preston, Jennifer; Walker, Alison; Williamson, Paula; Young, Bridget

    2014-01-01

    Background Randomised controlled trials (RCTs) are considered particularly likely to benefit from patient and public involvement (PPI). Decisions made by professional researchers at the outset may go on to have a significant impact on the potential for PPI contributions. Objective To increase knowledge of PPI within the early development of RCTs by systematically describing the reported level, nature and acceptability of proposed PPI to the funders. Methods Documentation from the outline application process for all RCTs that received funding from the Health Technology Assessment (HTA) Programme 2006–2010 was requested. For each application, data were extracted on trial characteristics, references to PPI in the development of the outline application and funding Board feedback, and plans for PPI in the full application and after the trial was funded. Results 110 applications were eligible with outline applications available for 90 (82%). The cohort covered a wide range of interventions and conditions. 54% (49/90) provided some information about PPI. 26 (28.9%) indicated PPI within the development of the outline application itself; 32 (35.6%) planned involvement in the full application and 43 (48%) once the trial was funded. Recruitment at diagnosis and surgical interventions were less likely to describe PPI. Blinded trials and trials in which participants may receive placebo only, more frequently described PPI activity. The HTA commissioning Board feedback rarely referred to PPI. Conclusions Incorporation of PPI within the development of the outline application or specification of plans for future involvement was low. Funder requests for applicants to provide information on PPI and justification for its absence should be welcomed but further research is needed to identify the impact of this on its contributions to research. Comments on PPI by reviewers should be directional rather than state that an increase is required. Challenges facing applicants in initiating PPI prior to funding need to be addressed. PMID:25056972

  19. July 1999 working group meeting on heavy vehicle aerodynamic drag: presentations and summary of comments and conclusions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brady, M; Browand, F; Flowers, D

    A Working Group Meeting on Heavy Vehicle Aerodynamic Drag was held at University of Southern California, Los Angeles, California on July 30, 1999. The purpose of the meeting was to present technical details on the experimental and computational plans and approaches and provide an update on progress in obtaining experimental results, model developments, and simulations. The focus of the meeting was a review of University of Southern California's (USC) experimental plans and results and the computational results from Lawrence Livermore National Laboratory (LLNL) and Sandia National Laboratories (SNL) for the integrated tractor-trailer benchmark geometry called the Sandia Model. Much ofmore » the meeting discussion involved the NASA Ames 7 ft x 10 ft wind tunnel tests and the need for documentation of the results. The present and projected budget and funding situation was also discussed. Presentations were given by representatives from the Department of Energy (DOE) Office of Transportation Technology Office of Heavy Vehicle Technology (OHVT), LLNL, SNL, USC, and California Institute of Technology (Caltech). This report contains the technical presentations (viewgraphs) delivered at the Meeting, briefly summarizes the comments and conclusions, and outlines the future action items.« less

  20. Urban Climate, Ozone Formation, and Public Health: Should Heat be Regulated as a Traditional Air Pollutant?

    NASA Astrophysics Data System (ADS)

    Stone, B.

    2003-12-01

    The return of record breaking heat waves to North American and European cities in 2003 highlights the growing need for urban planners to develop heat mitigation strategies for large metropolitan regions. Long associated with public health through its effects on human heat stress and heat related mortality, rising urban temperatures also hold important implications for regional air quality. This presentation will outline the results of a study focused on the relationship between regional temperatures and annual tropospheric ozone exceedances in the fifty largest (by population) metropolitan regions in the United States. With the aid of data from the EPA's National Emissions Inventory and NASA's Earth Observing System Data and Information System, this study examines trends in metropolitan emissions of nitrogen oxides, volatile organic compounds, mean regional temperatures, and annual ozone exceedances in U.S. metropolitan regions for the years 1990 through 1999. The intent of this work is to better establish connections between recent trends urban climate and ozone formation and to explore policy approaches to mitigating urban temperatures through physical planning. The results of this research indicate that annual violations of the national ozone standard during the decade of the 1990s were more closely associated with regional temperatures than with the emissions of regulated ozone precursors from mobile and stationary sources. Based on the results of this analysis, I argue that the air quality management strategies outlined in the Clean Air Act may be proving insufficient to control ozone formation due to ongoing and unanticipated changes in global and regional climate. I further argue that the emergence of urban heat as a significant threat to human health demands a strategic response from the fields of urban planning and public health. The presentation will conclude with a discussion of the linkages between urban form and ambient heat and will outline a set of policy approaches that have proven successful in mitigating urban heat production.

  1. Secondary Waste Cast Stone Waste Form Qualification Testing Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Westsik, Joseph H.; Serne, R. Jeffrey

    2012-09-26

    The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is being constructed to treat the 56 million gallons of radioactive waste stored in 177 underground tanks at the Hanford Site. The WTP includes a pretreatment facility to separate the wastes into high-level waste (HLW) and low-activity waste (LAW) fractions for vitrification and disposal. The LAW will be converted to glass for final disposal at the Integrated Disposal Facility (IDF). Cast Stone – a cementitious waste form, has been selected for solidification of this secondary waste stream after treatment in the ETF. The secondary-waste Cast Stone waste form must be acceptablemore » for disposal in the IDF. This secondary waste Cast Stone waste form qualification testing plan outlines the testing of the waste form and immobilization process to demonstrate that the Cast Stone waste form can comply with the disposal requirements. Specifications for the secondary-waste Cast Stone waste form have not been established. For this testing plan, Cast Stone specifications are derived from specifications for the immobilized LAW glass in the WTP contract, the waste acceptance criteria for the IDF, and the waste acceptance criteria in the IDF Permit issued by the State of Washington. This testing plan outlines the testing needed to demonstrate that the waste form can comply with these waste form specifications and acceptance criteria. The testing program must also demonstrate that the immobilization process can be controlled to consistently provide an acceptable waste form product. This testing plan also outlines the testing needed to provide the technical basis for understanding the long-term performance of the waste form in the disposal environment. These waste form performance data are needed to support performance assessment analyses of the long-term environmental impact of the secondary-waste Cast Stone waste form in the IDF« less

  2. Fortalecete! Pensamientos e ideas sobre el desarrollo de curriculo para maestras de educacion basica en espanol ("Get Energized! Thoughts and Ideas on Curriculum Development for Spanish Basic Education Teachers").

    ERIC Educational Resources Information Center

    Holyoke JUNTOS Adult Basic Education Collaborative, MA.

    This booklet outlines approaches to adult basic education Spanish literacy. It includes the following: explanatory note for English (non-Spanish) readers; general goals of a Spanish language literacy (SLL) program in Holyoke, Massachusetts; checklists; learning objectives for reading and writing; SLL lesson plan guide; outline for SLL curriculum…

  3. Induced Insecurity: Understanding the Potential Pitfalls in Developing Theater Campaign Plans

    DTIC Science & Technology

    2015-06-11

    effective partnerships that meet outlined in higher- level strategic guidance . 15. SUBJECT TERMS 16. SECURITY CLASSIFICATION OF: 17. UMITATION OF... effective partnerships that meet the desired end states outlined in higher-level strategic guidance. DEDICATION To the millions of men and women who...and draw conclusions, it does not always prove to be an effective means of predicting the outcome of current or future events. In addition, the

  4. Policy Concerns Relating to Teacher Recruitment and Deployment in Malawi. Education Sector Planning Policy Discussion Papers. Teacher Education Policy Position Papers. Paper # 1

    ERIC Educational Resources Information Center

    Sedere, Upali M.

    2005-01-01

    This paper outlines the issues relating to teacher education and teacher supply in Malawi. Malawi has a severe shortage of teachers. Over the years, particularly since EFA the student numbers has gone up yet the teacher supply has not followed the increased student numbers. This paper outlines the broader picture as a basis for further…

  5. Preparing the optics technology to observe the hot universe

    NASA Astrophysics Data System (ADS)

    Bavdaz, Marcos; Wille, Eric; Wallace, Kotska; Shortt, Brian; Fransen, Sebastiaan; Collon, Maximilien; Ackermann, Marcelo; Vacanti, Giuseppe; Guenther, Ramses; Haneveld, Jeroen; Riekerink, Mark Olde; van Baren, Coen; Kampf, Dirk; Zuknik, Karl-Heinz; Christensen, Finn; Della Monica Ferreira, Desiree; Jakobsen, Anders Clemen; Krumrey, Michael; Müller, Peter; Burwitz, Vadim; Pareschi, Giovanni; Ghigo, Mauro

    2014-07-01

    With the selection of "The hot and energetic Universe" as science theme for ESA's second large class mission (L2) in the Cosmic Vision programme, work is focusing on the technology preparation for an advanced X-ray observatory. The core enabling technology for the high performance mirror is the Silicon Pore Optics (SPO) [1 to 23], a modular X-ray optics technology, which utilises processes and equipment developed for the semiconductor industry. The paper provides an overview of the programmatic background, the status of SPO technology and gives an outline of the development roadmap and activities undertaken and planned by ESA on optics, coatings [24 to 30] and test facilities [31, 33].

  6. Plasma physics and environmental perturbation laboratory. [magnetospheric experiments from space shuttle

    NASA Technical Reports Server (NTRS)

    Vogl, J. L.

    1973-01-01

    Current work aimed at identifying the active magnetospheric experiments that can be performed from the Space Shuttle, and designing a laboratory to carry out these experiments is described. The laboratory, known as the PPEPL (Plasma Physics and Environmental Perturbation Laboratory) consists of 35-ft pallet of instruments connected to a 25-ft pressurized control module. The systems deployed from the pallet are two 50-m booms, two subsatellites, a high-power transmitter, a multipurpose accelerator, a set of deployable canisters, and a gimbaled instrument platform. Missions are planned to last seven days, during which two scientists will carry out experiments from within the pressurized module. The type of experiments to be performed are outlined.

  7. Amphibian research and monitoring initiative: Concepts and implementation

    USGS Publications Warehouse

    Corn, P.S.; Adams, M.J.; Battaglin, W.A.; Gallant, Alisa L.; James, D.L.; Knutson, M.; Langtimm, C.A.; Sauer, J.R.

    2005-01-01

    This report provides the basis for discussion and subsequent articulation of a national plan for the Amphibian Research and Monitoring Initiative (ARMI). The authors were members of a task force formed from within the U.S. Geological Survey (USGS) that included scientists with expertise in biology, cartography, hydrology, and statistics. The assignment of the task force was to extend work begun by the National Amphibian Leadership Group. This group, composed of senior USGS scientists, managers, and external authorities, met in Gainesville, Florida, in February 20001. The product of this meeting was a document outlining the framework for a national program to monitor amphibian populations and to conduct research into the causes of declines.

  8. Developing a strategic human resources plan for the Urban Angel.

    PubMed

    Owen, Susan M

    2011-01-01

    In healthcare a significant portion of the budget is related to human resources. However, many healthcare organizations have yet to develop and implement a focused organizational strategy that ensures all human resources are managed in a way that best supports the successful achievement of corporate strategies. St. Michael's Hospital, in Toronto, Ontario, recognized the benefits of a strategic human resources management plan. During an eight-month planning process, St. Michael's Hospital undertook the planning for and development of a strategic human resources management plan. Key learnings are outlined in this paper.

  9. Fostering Public Engagement in Local Land Use Planning and Zoning Recodification Projects: A Case Study from the University of Wisconsin--Extension, Lincoln County

    ERIC Educational Resources Information Center

    Cadwallader, Thomas K.; Lersch, Arthur D.

    2006-01-01

    This study outlines the processes used by University of Wisconsin--Extension, Lincoln County (UWELC), educators over an eight-year period to facilitate the development of a county land use plan and to guide committees through a review of the new proposed county zoning ordinances based on that plan. As a partner in these projects, UWELC helped…

  10. Planning/Budgeting/Evaluation Manual. An Operation Manual for Staff Members Concerning the Implementation of the Planning/Budgeting/Evaluation Cycle Within the Missouri State Department of Education.

    ERIC Educational Resources Information Center

    Missouri State Dept. of Education, Jefferson City.

    This manual identifies and systematizes the sequence of events necessary for the State Department of Education to effectively plan, implement, and evaluate its varied programs. The report (1) describes the cycle, (2) outlines the flow of events, (3) delineates offices responsible for each event, and (4) discusses overlapping phases of event cycles…

  11. The NASA/DOE/DOD nuclear rocket propulsion project - FY 1991 status

    NASA Technical Reports Server (NTRS)

    Clark, John S.; Miller, Thomas J.

    1991-01-01

    NASA has initiated planning and critical technology development for nuclear rocket propulsion systems for Space Exploration Initiative missions to the moon and to Mars. Interagency agreements are being negotiated between NASA, the Department of Energy, and the Department of Defense for joint technology development activities. This paper summarizes the activities of the NASA project planning team in FY 1990 that led to the draft Nuclear Propulsion Project Plan, outlines the FY 1991 Interagency activities, and describes the current status of the project plan.

  12. Application of mobile digital communications in law enforcement, an introductory planning guide

    NASA Technical Reports Server (NTRS)

    Sohn, R. L.; Abraham, J. E.; Leflang, W. G.; Kennedy, R. D.; Wilson, J. H.; Gurfield, R. M.

    1975-01-01

    A set of planning guidelines for the application of digital communications techniques to law enforcement use is presented. Some essential characteristics of digital techniques and their applications are outlined, as are some principles of system analysis, evaluation, and planning. Requirements analysis, system concept design, implementation planning, and performance and cost modeling are described and demonstrated with respect to this application problem. Information on law enforcement digital communications systems and equipment and a list of vendor sources are given in appendices.

  13. Application of computer-aided dispatch in law enforcement: An introductory planning guide

    NASA Technical Reports Server (NTRS)

    Sohn, R. L.; Gurfield, R. M.; Garcia, E. A.; Fielding, J. E.

    1975-01-01

    A set of planning guidelines for the application of computer-aided dispatching (CAD) to law enforcement is presented. Some essential characteristics and applications of CAD are outlined; the results of a survey of systems in the operational or planning phases are summarized. Requirements analysis, system concept design, implementation planning, and performance and cost modeling are described and demonstrated with numerous examples. Detailed descriptions of typical law enforcement CAD systems, and a list of vendor sources, are given in appendixes.

  14. Designing a School Library Media Center for the Future.

    ERIC Educational Resources Information Center

    Erikson, Rolf; Markuson, Carolyn

    This booklet presents guidance on building superior school library media centers by outlining conceptual plans from actual school libraries and explaining how to address specific planning and operational issues. The booklet discusses how to address the unique ergonomic and technology needs of children; how to control costs using proven bidding and…

  15. Beyond Reduction: Climate Change Adaptation Planning for Universities and Colleges

    ERIC Educational Resources Information Center

    Owen, Rochelle; Fisher, Erica; McKenzie, Kyle

    2013-01-01

    Purpose: The purpose of this paper is to outline a unique six-step process for the inclusion of climate change adaption goals and strategies in a University Climate Change Plan. Design/methodology/approach: A mixed-method approach was used to gather data on campus climate change vulnerabilities and adaption strategies. A literature review…

  16. FOCUS: a fire management planning system -- final report

    Treesearch

    Frederick W. Bratten; James B. Davis; George T. Flatman; Jerold W. Keith; Stanley R. Rapp; Theodore G. Storey

    1981-01-01

    FOCUS (Fire Operational Characteristics Using Simulation) is a computer simulation model for evaluating alternative fire management plans. This final report provides a broad overview of the FOCUS system, describes two major modules-fire suppression and cost, explains the role in the system of gaming large fires, and outlines the support programs and ways of...

  17. Clans of the Iroquois. Lesson Plans and Activities.

    ERIC Educational Resources Information Center

    Clute, Myron, Comp.; And Others

    This collection of lessons intended for use with elementary school children contains material that is descriptive of the Mohawk People, a group of the Iroquois Nation. The booklet contains an introduction on traditional kinship and family systems, unit outline on the concept of the clan, vocabulary, objectives and materials, and five lesson plans.…

  18. Mississippi Curriculum Framework for Metal Trades (Program CIP: 48.0590--Metal Trades). Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for metal trades I, IIA (advanced welding), and IIB (advanced machine shop).…

  19. Analyzing Gender and Sexuality in Magazine Advertisements

    ERIC Educational Resources Information Center

    Schubert, Katie

    2012-01-01

    This lesson plan is designed to help students become more aware of how advertisements play a role in shaping societal attitudes about gender and sexuality and how these messages effect their own beliefs. This lesson plan will outline how to effectively accomplish this goal in any course focusing on gender and/or sexuality.

  20. Supply Operations (DLA-O) Total Quality Management (TQM) Master Plan

    DTIC Science & Technology

    1989-07-01

    This document briefly outlines the DLA Directorate of Supply Operations plan to implement total quality management . It seeks to provide better...service to customers at a lower cost through continuous process improvement and commitment from everyone in the organization. Keywords: TQM (total Quality Management ), Supply operations; Continuous process improvement. (KR)

  1. Mississippi Curriculum Framework for Horticulture (Program CIP: 01.0601--Horticulture Serv. Op. & Mgmt., Gen.). Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for horticulture I and II. Presented first are a program description and…

  2. Scoping risk assessment protection against oil spills in the marine waters of northwest Washington State, volume 2. technical appendices

    DOT National Transportation Integrated Search

    1997-07-18

    On April 28, 1996 the White House issued the Department of Transportation (DOT) : Action Plan to Address Vessel and Environmental Safety in Puget Sound-Area Waters. : The Action Plan outlines several related tasks, the first stage of which was to : r...

  3. Promoting Engagement: Using Species Action Plans to Bring Together Students and Conservation Professionals

    ERIC Educational Resources Information Center

    Scott, Graham W.; Turnbull, Shona; Spencer, James

    2008-01-01

    We describe an exercise, the production of a species action plan, which utilises components of both transmission mode and experiential learning. This exercise brings together students and a professional role model to promote a stronger engagement with aspects of local biodiversity management. We outline perceived benefits and outcomes of the…

  4. Adding a landscape ecology perspective to conservation and management planning

    Treesearch

    Kathryn E. Freemark; John R. Probst; John B. Dunning; Salllie J. Hejl

    1993-01-01

    We briefly review concepts in landscape ecology and discuss their relevance to the conservation and management of neotropical migrant landbirds. We then integrate a landscape perspective into a spatially-hierarchical framework for conservation and management planning for neotropical migrant landbirds (and other biota). The framework outlines a comprehensive approach by...

  5. Air Pollution Technology: A Suggested Two-Year Post High School Curriculum.

    ERIC Educational Resources Information Center

    Santa Fe Community Coll., Gainesville, FL.

    The purpose of this guide is to help school administrators and instructors in planning and developing new programs in the air pollution control field, or in evaluating those in existence. It contains course outlines for technical specialization courses as well as necessary basic science and communication courses. Also included are plans for…

  6. Schools As Post-Disaster Shelters: Planning and Management Guidelines for Districts and Sites.

    ERIC Educational Resources Information Center

    California State Office of Emergency Services, Sacramento.

    This guidebook outlines a method for preparing school facilities and personnel in the event that schools are needed for disaster shelters. It serves as a blueprint for planning and preparedness. Chapter 1 provides descriptions of actual incidents in which California schools served as emergency shelters. Chapter 2 describes schools' legal…

  7. Emergency Medical Technician-Ambulance: National Standard Curriculum. Instructor's Lesson Plans (Third Edition).

    ERIC Educational Resources Information Center

    National Highway Traffic Safety Administration (DOT), Washington, DC.

    This set of instructor's lesson plans is one of three documents prepared for the Emergency Medical Technician (EMT) National Standard Curriculum. It contains detailed outlines of course content and guidance for teaching each course lesson. The training course contains 33 lessons covering all emergency medical techniques currently considered to be…

  8. Mississippi Curriculum Framework for Agriculture Production (Program CIP: 01.0301--Agricultural Prod. Workers & Mgrs.). Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for agriculture production I and II. Presented first are a program…

  9. HEFCE Strategic Plan, 2001-06. Report.

    ERIC Educational Resources Information Center

    Higher Education Funding Council for England, Bristol.

    This document outlines the strategic plan of the Higher Education Funding Council for England (HEFCE) for the years 2001 through 2006. The mission of the HEFCE is to promote and fund high quality, cost-effective teaching and research, meeting the diverse needs of students, the economy, and society. To achieve this mission, the HEFCE intends to…

  10. ORNL Annual Sustainability Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lapsa, Melissa Voss; Nichols, Teresa A.

    2014-02-01

    As described in this report, we have made substantial progress across the 25 roadmaps of the Sustainable Campus Initiative. The report also outlines our plans to continue integrating sustainable practices into the planning, execution, and evaluation of all ORNL activities. We appreciate your interest in our journey to sustainability, and we welcome your comments, questions, and suggestions.

  11. Stakeholder Engagement Road Map and Peer Review Overview for EPA's Study of the Potential Impacts of Hydraulic Fracturing on Drinking Water Resources

    EPA Pesticide Factsheets

    This roadmap outlines EPA’s plans to build upon the Agency’s commitment to transparency & stakeholder engagement coordinated during the development of the Hydraulic Fracturing (HF) Study Plan & will help inform the 2014 HF study draft assessment report.

  12. Foreign Language Camps: Camp Waskowitz. Teacher's Guide and Planning Book.

    ERIC Educational Resources Information Center

    Baudin, Phil; And Others

    This guide to running a foreign language camp is intended to cover all aspects of camp administration and program planning. The philosophy of language camps is set forth. The chairperson's responsibilities regarding staff recruitment, staff assignments, and handling finances are outlined. Sample schedules for French, Spanish, and German camps are…

  13. Conference Model: Guidelines...for Science Supervisors on How to Conduct a Successful Leadership Conference.

    ERIC Educational Resources Information Center

    DeBlasi, Robert V.

    Guidelines of a four-phase model for conducting leadership conferences are outlined. Phase I focuses on initial conference planning, including (1) identifying need and purpose for the conference; (2) selecting a conference chairperson; (3) forming the conference planning committee, listing suggested committees and their responsibilities (program,…

  14. Mississippi Curriculum Framework for Building Trades (Program CIP: 46.0490--Building Trades, General). Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for two secondary-level courses in the building trades: building trades I and…

  15. Strategic survey framework for the Northwest Forest Plan survey and manage program.

    Treesearch

    Randy Molina; Dan McKenzie; Robin Lesher; Jan Ford; Jim Alegria; Richard Cutler

    2003-01-01

    This document outlines an iterative process for assessing the information needs for all Northwest Forest Plan (NWFP) survey and manage species, designing and implementing strategic surveys (including field surveys and other information-gathering processes), and analyzing that information for use in the NWFP annual species review and adaptive-management processes. The...

  16. Marketing Your Program

    ERIC Educational Resources Information Center

    Anderson, Susan

    2009-01-01

    A marketing plan outlines the specific actions a person intends to carry out to interest potential customers in his/her service and to persuade them to buy the services he/she offers. In other words, a marketing plan defines what his/her organization will do to interest new families in his/her facility and encourage them to enroll their children…

  17. Mississippi Curriculum Framework for Welding (Program CIP: 48.0508--Welder/Welding Technologist). Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for welding I and II. Presented first are a program description and course…

  18. Hispanic Strategies for 1984-85. A Planning Document.

    ERIC Educational Resources Information Center

    Washington State Commission on Mexican American Affairs, Olympia.

    Policy suggestions of the Washington State Commission on Mexican American Affairs for 1984 and 1985 are outlined in this two-year comprehensive plan. First, facts about the commission's membership, budget and purposes (as well as general data on the Hispanic population of Washington) are presented. Next, seven issue statements are provided, each…

  19. 15. Photographic copy of the original construction plans, dated July ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Photographic copy of the original construction plans, dated July 20, 1923, from the blueprints in possession of DuPage County, Division of Transportation, Wheaton, Illinois. FRONT ELEVATION SHOWING OUTLINES AND REINFORCEMENT (sheet 3 of 3) - Fullersburg Bridge, Spanning Salt Creek at York Road, Oak Brook, Du Page County, IL

  20. Career Planning for Minority Women. Facilitator's Manual.

    ERIC Educational Resources Information Center

    Jackson, Stanlie M., Ed.

    This facilitator's manual consists of guidelines and materials for use in conducting a workshop dealing with career planning for minority women. Covered in the first half of the manual are the following aspects of implementing the workshop: background on the need for and development of the workshop, a workshop outline and time schedule, the…

Top