Sample records for work plan presents

  1. Facility Planning in the Construction Grants Program. Instructor Guide. Working for Clean Water: An Information Program for Advisory Groups.

    ERIC Educational Resources Information Center

    Buskirk, E. Drannon, Jr.; Cole, Charles A.

    Wastewater facility planning is an essential component of the federal construction grants process. Presented in this instructor's guide is a one-hour presentation on facility planning intended for citizen advisory groups. The guide is part of the Working for Clean Water Project, which also includes a supplementary audiovisual presentation.…

  2. As They Liked It: The Tragical-Comical-Pastoral Drama of Elizabethan Theatre. Curriculum Projects. The Huntington Theatre Company's Master Works Study in Shakespeare.

    ERIC Educational Resources Information Center

    Huntington Theatre Co., Boston, MA.

    Developed by the participants of the Huntington Theatre Company's Master Works Study in Shakespeare, this collection presents single lesson plans and unit plans for teaching Elizabethan drama. The collection presents 12 lesson plans (spanning one or a few days of instruction) and 15 unit plans (ranging over several weeks) suitable for secondary…

  3. Migration plans and hours of work in Malaysia.

    PubMed

    Gillin, E D; Sumner, D A

    1985-01-01

    "This article describes characteristics of prospective migrants in the Malaysian Family Life Survey and investigates how planning to move affects hours of work. [The authors] use ideas about intertemporal substitution...to discuss the response to temporary and permanent wage expectations on the part of potential migrants. [An] econometric section presents reduced-form estimates for wage rates and planned migration equations and two-stage least squares estimates for hours of work. Men currently planning a move were found to work fewer hours. Those originally planning only a temporary stay at their current location work more hours." excerpt

  4. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1989.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration. Division of Fish and Wildlife.

    1988-11-01

    The FY 1989 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1989. The Work Plan focuses on individual Action Items found in the 1987 Program for which Bonneville Power Administration (BPA) has determined that it has authority and responsibility to implement. Each of the entries in the Work Plan includes objectives, background, and progress to date in achieving those objectives, and a summary of plans for implementation in FY 1989. Most Action Items are implemented through one or moremore » BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. The FY 1989 Work Plan emphasizes continuation of 113 projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. BPA also plans to start 20 new projects in FY 1989. The number of ongoing FY 1988 projects to be continued in FY 1989 and the number of new projects planned to start in FY 1989 are based on current (September 7, 1988) procurement expectations. Several projects presently in BPA's procurement process are expected to be contracted by September 30, 1988, the last day of FY 1988. Although these projects have not yet started, they have been listed in the Work Plan as ongoing FY 1988 projects, based on projected start dates in late September 1988. Throughout the Work Plan, those projects with projected start dates in September 1988 have been noted.« less

  5. Social Work Education. Report of Master Plan Committee S.

    ERIC Educational Resources Information Center

    Illinois State Board of Higher Education, Springfield. Master Plan Committee.

    This report of the Master Plan Committee on Social Work Education is part of Phase III of the Illinois Statewide Master Plan for Higher Education dealing with graduate and professional education. Part I presents an overview. Part II gives a brief description of social work and a statement of the problem. In Part III the social work manpower in the…

  6. Contribution of Reactive and Proactive Control to Children's Working Memory Performance: Insight from Item Recall Durations in Response Sequence Planning

    ERIC Educational Resources Information Center

    Chevalier, Nicolas; James, Tiffany D.; Wiebe, Sandra A.; Nelson, Jennifer Mize; Espy, Kimberly Andrews

    2014-01-01

    The present study addressed whether developmental improvement in working memory span task performance relies upon a growing ability to proactively plan response sequences during childhood. Two hundred thirteen children completed a working memory span task in which they used a touchscreen to reproduce orally presented sequences of animal names.…

  7. Long Range Plan: 1992-1995.

    ERIC Educational Resources Information Center

    Pennsylvania Coll. of Technology, Williamsport.

    Intended to enhance strategic planning and enable staff to work as a team toward a shared vision and common goals, this report presents the 1992-95 long-range plan of the Pennsylvania College of Technology (PCT). Part I defines long-range planning; describes the structure and use of the plan at PCT; presents PCT's philosophy, mission, and vision…

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan formore » the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.« less

  9. Planning a Unit of Work: Incorporating Students' Questions.

    ERIC Educational Resources Information Center

    Hanifi, Hadiya; Donald, Kelly; Zeegers, Yvonne

    2003-01-01

    Presents a plan for a unit of work on spiders. Suggests initiating class discussion with issues of safety and environmental responsibility that are considered when dealing with the hands-on aspects of topics. (KHR)

  10. Perspectives and Plans for Graduate Studies. 8. Anthropology 1974.

    ERIC Educational Resources Information Center

    Council of Ontario Universities, Toronto.

    At the present time there are two graduate programs in anthropology in Ontario. An examination of the 3-year plans submitted in 1972 revealed that several universities in Ontario were proposing master's work in anthropology. It was decided to place master's work in anthropology under provisional embargo until a "mini-planning assessment"…

  11. 75 FR 27618 - RTCA Government/Industry Air Traffic Management Advisory Committee (ATMAC)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-17

    ... Plenary (Welcome and Introductions); Trajectory Operations (TOps) Work Group Presentation of Document... Work Group (NGIWG) Report, Discussion, and possible Next Steps; ADS-B Work Group Presentation of Legacy... Activity Airspace Program (NSAAP) Presentation Requested by Requirements and Planning Work Group, Airspace...

  12. Streamlining Collaborative Planning in Spacecraft Mission Architectures

    NASA Technical Reports Server (NTRS)

    Misra, Dhariti; Bopf, Michel; Fishman, Mark; Jones, Jeremy; Kerbel, Uri; Pell, Vince

    2000-01-01

    During the past two decades, the planning and scheduling community has substantially increased the capability and efficiency of individual planning and scheduling systems. Relatively recently, research work to streamline collaboration between planning systems is gaining attention. Spacecraft missions stand to benefit substantially from this work as they require the coordination of multiple planning organizations and planning systems. Up to the present time this coordination has demanded a great deal of human intervention and/or extensive custom software development efforts. This problem will become acute with increased requirements for cross-mission plan coordination and multi -spacecraft mission planning. The Advanced Architectures and Automation Branch of NASA's Goddard Space Flight Center is taking innovative steps to define collaborative planning architectures, and to identify coordinated planning tools for Cross-Mission Campaigns. Prototypes are being developed to validate these architectures and assess the usefulness of the coordination tools by the planning community. This presentation will focus on one such planning coordination too], named Visual Observation Layout Tool (VOLT), which is currently being developed to streamline the coordination between astronomical missions

  13. The costs of changing an intended action: movement planning, but not execution, interferes with verbal working memory.

    PubMed

    Spiegel, M A; Koester, D; Weigelt, M; Schack, T

    2012-02-16

    How much cognitive effort does it take to change a movement plan? In previous studies, it has been shown that humans plan and represent actions in advance, but it remains unclear whether or not action planning and verbal working memory share cognitive resources. Using a novel experimental paradigm, we combined in two experiments a grasp-to-place task with a verbal working memory task. Participants planned a placing movement toward one of two target positions and subsequently encoded and maintained visually presented letters. Both experiments revealed that re-planning the intended action reduced letter recall performance; execution time, however, was not influenced by action modifications. The results of Experiment 2 suggest that the action's interference with verbal working memory arose during the planning rather than the execution phase of the movement. Together, our results strongly suggest that movement planning and verbal working memory share common cognitive resources. Copyright © 2011 Elsevier Ireland Ltd. All rights reserved.

  14. Three Year Work Plan (2007--10) of the IUHPE Northern Part of the Western Pacific Region.

    PubMed

    Nakahara, Toshitaka

    2008-09-01

    The article presents the work plan of the Vice President for the Northern Part of the Western Pacific Region of the IUHPE. The highlights of the plan include, firstly, the organization of the First Asia-Pacific Conference on Health Promotion and Health Education, which will take place in July 2009. Secondly, the plan proposes the establishment of a liaison office and an Internet journal to facilitate collaboration among individuals, groups and organizations working in health promotion and education in this culturally and linguistically diverse region.

  15. Perspectives and Plans for Graduate Studies. 11. Engineering 1974. E. Industrial Engineering and Systems Design. Report No. 74-22.

    ERIC Educational Resources Information Center

    Ontario Council on Graduate Studies, Toronto. Advisory Committee on Academic Planning.

    On the instruction of the Council of Ontario Universities, the Advisory Committee on Academic Planning in cooperation with the Committee of Ontario Deans of Engineering has conducted a planning assessment for doctoral work in industrial engineering and systems design. Recommendations for doctoral work in engineering studies are presented.…

  16. Delineation of State Agency, Accreditation, and Institutional Responsibilities. Improving Community College Evaluation and Planning: Project Working Paper Number Four.

    ERIC Educational Resources Information Center

    California Community Colleges, Sacramento. Office of the Chancellor.

    One of a series of papers resulting from a Fund for the Improvement of Postsecondary Education (FIPSE) project to improve evaluation and planning in community colleges, this working paper presents a plan of purposes and activities to experimentally test a model of delineation of responsibilities among accrediting commissions, state agencies, and…

  17. 78 FR 51749 - Proposed Information Collection; Ventilation Plan and Main Fan Maintenance Record (Pertains to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-21

    ... maintaining a safe and healthful working environment. A well planned mine ventilation system is necessary to assure a fresh air supply to miners at all working places, to control the amounts of harmful airborne... usually present harsh and hostile working environments. The ventilation system is the most vital life...

  18. Planning and Accreditation: A Survey of Attitudes of Policymakers. Improving Community College Evaluation and Planning: Project Working Papers Numbers Five, Six, and Seven.

    ERIC Educational Resources Information Center

    California Community Colleges, Sacramento. Office of the Chancellor.

    One of a series of papers resulting from a Fund for the Improvement of Postsecondary Education (FIPSE) project to improve evaluation and planning in community colleges, this working paper presents the results of interviews with community college policymakers conducted to assess their views on matters such as non-governmental accreditation,…

  19. EOS Terra Terra Constellation Exit/Future Maneuver Plans Update

    NASA Technical Reports Server (NTRS)

    Mantziaras, Dimitrios

    2016-01-01

    This EOS Terra Constellation Exit/Future Maneuver Plans Update presentation will discuss brief history of Terra EOM work; lifetime fuel estimates; baseline vs. proposed plan origin; resultant exit orbit; baseline vs. proposed exit plan; long term orbit altitude; revised lifetime proposal and fallback options.

  20. Interference due to shared features between action plans is influenced by working memory span.

    PubMed

    Fournier, Lisa R; Behmer, Lawrence P; Stubblefield, Alexandra M

    2014-12-01

    In this study, we examined the interactions between the action plans that we hold in memory and the actions that we carry out, asking whether the interference due to shared features between action plans is due to selection demands imposed on working memory. Individuals with low and high working memory spans learned arbitrary motor actions in response to two different visual events (A and B), presented in a serial order. They planned a response to the first event (A) and while maintaining this action plan in memory they then executed a speeded response to the second event (B). Afterward, they executed the action plan for the first event (A) maintained in memory. Speeded responses to the second event (B) were delayed when it shared an action feature (feature overlap) with the first event (A), relative to when it did not (no feature overlap). The size of the feature-overlap delay was greater for low-span than for high-span participants. This indicates that interference due to overlapping action plans is greater when fewer working memory resources are available, suggesting that this interference is due to selection demands imposed on working memory. Thus, working memory plays an important role in managing current and upcoming action plans, at least for newly learned tasks. Also, managing multiple action plans is compromised in individuals who have low versus high working memory spans.

  1. High severity fire in forests of the southwest: Conservation implications. Progress Report August 2005

    USGS Publications Warehouse

    Haire, Sandra L.

    2006-01-01

    Here, we describe the first stages of our work in mapping burn severity at old and new burns as well as the work we have recently completed at our two field sites. The report is organized under our two main objectives with the purpose of summarizing the steps we have taken in working toward these objectives, as well as changes we have made in methodologies since the original study plan. We present some general observations and plans for the next steps in data analysis and product generation. This report, the study plan, a photograph gallery, slide presentations, and our contact information are available on the project Web site http://www.umass.edu/landeco/research/swfire/swfire.html .

  2. Effects of Individual Differences in Working Memory on Plan Presentational Choices

    PubMed Central

    Tintarev, Nava; Masthoff, Judith

    2016-01-01

    This paper addresses research questions that are central to the area of visualization interfaces for decision support: (RQ1) whether individual user differences in working memory should be considered when choosing how to present visualizations; (RQ2) how to present the visualization to support effective decision making and processing; and (RQ3) how to evaluate the effectiveness of presentational choices. These questions are addressed in the context of presenting plans, or sequences of actions, to users. The experiments are conducted in several domains, and the findings are relevant to applications such as semi-autonomous systems in logistics. That is, scenarios that require the attention of humans who are likely to be interrupted, and require good performance but are not time critical. Following a literature review of different types of individual differences in users that have been found to affect the effectiveness of presentational choices, we consider specifically the influence of individuals' working memory (RQ1). The review also considers metrics used to evaluate presentational choices, and types of presentational choices considered. As for presentational choices (RQ2), we consider a number of variants including interactivity, aggregation, layout, and emphasis. Finally, to evaluate the effectiveness of plan presentational choices (RQ3) we adopt a layered-evaluation approach and measure performance in a dual task paradigm, involving both task interleaving and evaluation of situational awareness. This novel methodology for evaluating visualizations is employed in a series of experiments investigating presentational choices for a plan. A key finding is that emphasizing steps (by highlighting borders) can improve effectiveness on a primary task, but only when controlling for individual variation in working memory. PMID:27899905

  3. Effects of Individual Differences in Working Memory on Plan Presentational Choices.

    PubMed

    Tintarev, Nava; Masthoff, Judith

    2016-01-01

    This paper addresses research questions that are central to the area of visualization interfaces for decision support: (RQ1) whether individual user differences in working memory should be considered when choosing how to present visualizations; (RQ2) how to present the visualization to support effective decision making and processing; and (RQ3) how to evaluate the effectiveness of presentational choices. These questions are addressed in the context of presenting plans, or sequences of actions, to users. The experiments are conducted in several domains, and the findings are relevant to applications such as semi-autonomous systems in logistics. That is, scenarios that require the attention of humans who are likely to be interrupted, and require good performance but are not time critical. Following a literature review of different types of individual differences in users that have been found to affect the effectiveness of presentational choices, we consider specifically the influence of individuals' working memory (RQ1). The review also considers metrics used to evaluate presentational choices, and types of presentational choices considered. As for presentational choices (RQ2), we consider a number of variants including interactivity, aggregation, layout, and emphasis. Finally, to evaluate the effectiveness of plan presentational choices (RQ3) we adopt a layered-evaluation approach and measure performance in a dual task paradigm, involving both task interleaving and evaluation of situational awareness. This novel methodology for evaluating visualizations is employed in a series of experiments investigating presentational choices for a plan. A key finding is that emphasizing steps (by highlighting borders) can improve effectiveness on a primary task, but only when controlling for individual variation in working memory.

  4. Final Work Plan: Targeted Investigation at York, Nebraska

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, Lorraine M.

    The targeted investigation at York will be implemented in phases, so that data collected and interpretations developed at each stage of the program can be evaluated to guide subsequent phases most effectively. Section 2 of this Work Plan presents a brief overview of the York site, its geologic and hydrologic setting, and the previous CCC/USDA investigations. Section 3, outlines the proposed technical program for the targeted investigation, and Section 4 describes the investigative methods to be employed. A community relations plan is in Section 5, and Section 6 includes health and safety information. In addition to this site-specific Work Plan,more » the Master Work Plan (Argonne 2002) developed by Argonne for CCC/USDA investigations in Nebraska should be consulted for complete details of the methods and procedures to be used at York.« less

  5. Applying Planning Algorithms to Argue in Cooperative Work

    NASA Astrophysics Data System (ADS)

    Monteserin, Ariel; Schiaffino, Silvia; Amandi, Analía

    Negotiation is typically utilized in cooperative work scenarios for solving conflicts. Anticipating possible arguments in this negotiation step represents a key factor since we can take decisions about our participation in the cooperation process. In this context, we present a novel application of planning algorithms for argument generation, where the actions of a plan represent the arguments that a person might use during the argumentation process. In this way, we can plan how to persuade the other participants in cooperative work for reaching an expected agreement in terms of our interests. This approach allows us to take advantages since we can test anticipated argumentative solutions in advance.

  6. Psychological and Organizational Correlates of Career Patterns in Clinical Laboratory Occupations.

    ERIC Educational Resources Information Center

    Jeswald, Thomas Anthony

    The purpose of the project was to provide research data concerning attitudes and satisfactions of present clinical laboratory employees which would be helpful in planning future recruitment and retention efforts. Questionnaires requesting information regarding the personal and work histories, work attitudes, career plans, and need satisfaction of…

  7. The Planning of Teaching in the Context of Lesson Study: Research Findings

    ERIC Educational Resources Information Center

    Kanellopoulou, Eurydice-Maria; Darra, Maria

    2018-01-01

    The main purpose of the present study is to examine the attitudes, perceptions and experiences of the teachers participating in the planning of teaching in the context of the Lesson Study. The present work, which is part of a wider research effort, followed a mixed methodological planning for reasons of triangulation. The survey was conducted from…

  8. US Plans for the JEM-EUSO

    NASA Technical Reports Server (NTRS)

    Adams, James H.

    2007-01-01

    This viewgraph presentation reviews the planned United States work on the Extreme Universe Space Observatory (EUSO.) The EUSO is to be mounted to the JEM (Japanese Experiment Module). The plans areas for US participation are the Optics Investigations, Trigger Design and Event Reconstruction.

  9. Ecological Approaches to Transition Planning for Students with Autism and Asperger's Syndrome

    ERIC Educational Resources Information Center

    Dente, Claire L.; Parkinson Coles, Kallie

    2012-01-01

    This article presents a compelling case for the increased role of social workers in work with individuals with autism and Asperger's syndrome in secondary school settings, specifically in transition planning for postsecondary educational pursuits. Social work education prepares social workers to address micro, mezzo, and macro levels of practice…

  10. Contribution of reactive and proactive control to children's working memory performance: Insight from item recall durations in response sequence planning.

    PubMed

    Chevalier, Nicolas; James, Tiffany D; Wiebe, Sandra A; Nelson, Jennifer Mize; Espy, Kimberly Andrews

    2014-07-01

    The present study addressed whether developmental improvement in working memory span task performance relies upon a growing ability to proactively plan response sequences during childhood. Two hundred thirteen children completed a working memory span task in which they used a touchscreen to reproduce orally presented sequences of animal names. Children were assessed longitudinally at 7 time points between 3 and 10 years of age. Twenty-one young adults also completed the same task. Proactive response sequence planning was assessed by comparing recall durations for the 1st item (preparatory interval) and subsequent items. At preschool age, the preparatory interval was generally shorter than subsequent item recall durations, whereas it was systematically longer during elementary school and in adults. Although children mostly approached the task reactively at preschool, they proactively planned response sequences with increasing efficiency from age 7 on, like adults. These findings clarify the nature of the changes in executive control that support working memory performance with age. (PsycINFO Database Record (c) 2014 APA, all rights reserved).

  11. Defense Commissary Resale Stock Fund Financial Statements For FY 1992

    DTIC Science & Technology

    1993-06-30

    present DeCA’s accounting procedures during FY 1992. We understand DeCA is aggressively working to improve its financial management system. However...the year ended September 30, 1992, we considered the related internal control structure. The purpose of the planning work was to determine the...auditing procedures we would apply for the purposes of expressing our opinion on the Financial Statements. Planning work included obtaining an

  12. IMMR Phase 1 Prototyping Plan Inputs

    NASA Technical Reports Server (NTRS)

    Vowell, C. W.; Johnson-Throop, Kathy; Smith, Bryon; Darcy, Jeannette

    2006-01-01

    This viewgraph presentation reviews the phase I plan of the prototype of the IMMR by the Multilateral Medical Operations Panel (MMOP) Medical Informatics & Technology (MIT) Working Group. It reviews the Purpose of IMMR Prototype Phase 1 (IPP1); the IPP1 Plan Overview, the IMMR Prototype Phase 1 Plan for PDDs and MIC and MIC-DDs, Plan for MICs, a nd the IPP1 objectives

  13. The space shuttle payload planning working groups: Executive summaries

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The findings of a space shuttle payload planning group session are presented. The purpose of the workshop is: (1) to provide guidance for the design and development of the space shuttle and the spacelab and (2) to plan a space science and applications program for the 1980 time period. Individual groups were organized to cover the various space sciences, applications, technologies, and life sciences. Summaries of the reports submitted by the working groups are provided.

  14. A selective annotated bibliography for clinical audiology (1988-2008): reference works.

    PubMed

    Ferrer-Vinent, Susan T; Ferrer-Vinent, Ignacio J

    2009-06-01

    This is the 1st in a series of 3 planned companion articles that present a selected, annotated, and indexed bibliography of clinical audiology publications from 1988 to 2008. Research and preparation of the bibliography were based on published guidelines, professional audiology experience, and professional librarian experience. This article presents reference works (dictionaries, encyclopedias, handbooks, and manuals). The future planned articles will cover other monographs, periodicals, and online resources. Audiologists and librarians can use these lists as a guide when seeking clinical audiology literature.

  15. Building the IOOS data management subsystem

    USGS Publications Warehouse

    de La Beaujardière, J.; Mendelssohn, R.; Ortiz, C.; Signell, R.

    2010-01-01

    We discuss progress to date and plans for the Integrated Ocean Observing System (IOOS??) Data Management and Communications (DMAC) subsystem. We begin by presenting a conceptual architecture of IOOS DMAC. We describe work done as part of a 3-year pilot project known as the Data Integration Framework and the subsequent assessment of lessons learned. We present work that has been accomplished as part of the initial version of the IOOS Data Catalog. Finally, we discuss near-term plans for augmenting IOOS DMAC capabilities.

  16. State University System of Florida

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2012

    2012-01-01

    This paper presents some information about the State University System of Florida. The following are presented in this paper: (1) University Work Plans and Annual Reports; (2) State University System 2009 Annual Report; (3) Quick Facts: Planned New Degree Programs--2010 to 2013; (4) State University System Tuition Differential Summary, FY…

  17. Brothers Grimm. [Lesson Plan].

    ERIC Educational Resources Information Center

    Discovery Communications, Inc., Bethesda, MD.

    Based on Grimm's fairy tales, this lesson plan presents activities designed to help students understand that fairy tales connect them to earlier generations, help them think about present situations, that magic figures prominently in fairy tales, and that fairy tales can inspire readers to create original works of art. The main activity in the…

  18. Aqua/Aura Inclination Adjust Maneuver Series Spring 2018 Planning

    NASA Technical Reports Server (NTRS)

    Trenholme, Elena; Boone, Spencer

    2017-01-01

    This will be presented at the International Earth Science Constellation Mission Operations Working Group meeting on December 6-8, 2017 to discuss the Aqua/Aura Spring 2018 Inclination Adjust Maneuver series planning. Presentation has been reviewed and approved by Eric Moyer, ESMO (Earth Science Mission Operations) Deputy Project Manager.

  19. How Best to Assess Students Taking Work Placements? An Empirical Investigation from Australian Urban and Regional Planning

    ERIC Educational Resources Information Center

    Jackson, John; Jones, Martyn; Steele, Wendy; Coiacetto, Eddo

    2017-01-01

    Work placements (including internships) are common in urban and regional planning education but the relevant literature has largely overlooked their assessment and academic standards. To address this gap, the paper presents a study of this topic undertaken within the Australian context. The research involved systematically scoping the status of…

  20. Verifying AI Plan Models: Even the Best Laid Plans Need to be Verified

    NASA Technical Reports Server (NTRS)

    Smith, Margaret; Cucullu, Gordon; Holzmann, Gerard; Smith, Benjamin

    2004-01-01

    This viewgraph presentation reviews work on model checking, and specifically the SPIN model checker. The goal of this work is to retire a significant class of risks associated with the use of Artificial Intelligence (Al) Planners on Missions. This effort must provide tangible testing results to a mission using Al technology. It is hoped that the work should be possible to leverage the technique and tools throughout NASA

  1. Popes in the Pizza: Analyzing Activity Reports to Create and Sustain a Strategic Plan

    ERIC Educational Resources Information Center

    Sweet, Charlie; Blythe, Hal; Keeley, E. J.; Forsyth, Ben

    2008-01-01

    This article presents a practical methodology for creating and sustaining strategic planning, the task analysis. Utilizing our Teaching & Learning Center Strategic Plan as a model, we demonstrate how working with a weekly status report provides a comprehensive listing of detail necessary to analyze and revise the plan. The new methodology is…

  2. Planning Under Continuous Time and Resource Uncertainty: A Challenge for AI

    NASA Technical Reports Server (NTRS)

    Bresina, John; Dearden, Richard; Meuleau, Nicolas; Smith, David; Washington, Rich; Clancy, Daniel (Technical Monitor)

    2002-01-01

    There has been considerable work in Al on decision-theoretic planning and planning under uncertainty. Unfortunately, all of this work suffers from one or more of the following limitations: 1) it relies on very simple models of actions and time, 2) it assumes that uncertainty is manifested in discrete action outcomes, and 3) it is only practical for very small problems. For many real world problems, these assumptions fail to hold. A case in point is planning the activities for a Mars rover. For this domain none of the above assumptions are valid: 1) actions can be concurrent and have differing durations, 2) there is uncertainty concerning action durations and consumption of continuous resources like power, and 3) typical daily plans involve on the order of a hundred actions. We describe the rover problem, discuss previous work on planning under uncertainty, and present a detailed. but very small, example illustrating some of the difficulties of finding good plans.

  3. National Space Transportation and Support Study/technology requirements and plans

    NASA Technical Reports Server (NTRS)

    Walberg, G. D.; Gasperich, F. J., Jr.; Scheyhing, E. R.

    1986-01-01

    This paper presents a generic technology plan which has been developed as part of the National Space Transportation and Support Study. This program, which addresses a wide variety of potentially high payoff technology areas, is structured to promote both enhanced vehicle performance and greatly improved operational efficiency and includes both evolutionary and breakthrough technologies. The plan is presented in terms of disciplinary plan elements, which were developed by joint NASA/USAF disciplinary working groups, and as a set of demonstration projects which serve as focal points for the overall plan and drive the development of the many interrelated disciplinary activities.

  4. Four-phase or two-phase signal plan? A study on four-leg intersection by cellular automaton simulations

    NASA Astrophysics Data System (ADS)

    Jin, Cheng-Jie; Wang, Wei; Jiang, Rui

    2016-08-01

    The proper setting of traffic signals at signalized intersections is one of the most important tasks in traffic control and management. This paper has evaluated the four-phase traffic signal plans at a four-leg intersection via cellular automaton simulations. Each leg consists of three lanes, an exclusive left-turn lane, a through lane, and a through/right-turn lane. For a comparison, we also evaluate the two-phase signal plan. The diagram of the intersection states in the space of inflow rate versus turning ratio has been presented, which exhibits four regions: In region I/II/III, congestion will propagate upstream and laterally and result in queue spillover with both signal plans/two-phase signal plan/four-phase signal plan, respectively. Therefore, neither signal plan works in region I, and only the four-phase signal plan/two-phase signal plan works in region II/III. In region IV, both signal plans work, but two-phase signal plan performs better in terms of average delays of vehicles. Finally, we study the diagram of the intersection states and average delays in the asymmetrical configurations.

  5. Retirement planning and work-related variables in Chinese older nurses: A cross-sectional study.

    PubMed

    Liu, Peng-Cheng; Zhang, Huan-Huan; Zhang, Mei-Ling; Ying, Jie; Shi, Ying; Wang, Shou-Qi; Sun, Jiao

    2018-03-01

    To explore the situation of older nurses approaching retirement with regard to their retirement planning, and the relationship of their retirement planning behaviour with the job environment and job satisfaction under their current employment arrangements and other work-related variables. Nurse shortage has become a global phenomenon that can be alleviated by retaining older nurses in service. The Chinese government proposed the "Incremental Delay Retirement Age Policy." However, older nurses face delayed retirement but lack retirement plans. A cross-sectional questionnaire survey was conducted among a convenience sample of older retiring nurses (n = 152; 84.92% response rate) recruited from every department of four large general hospitals in Changchun, Jilin Province from June to August 2016. The majority of the respondents presented poor retirement planning (n = 122, 80.3%). The independent variables of information exchange with patients, teamwork and personal growth and development explained approximately 16.6% of the variance in retirement planning. Nurse-patient communication and personal growth and development can promote retirement planning, but teamwork is negatively related to retirement planning. Retirement planning by Chinese older nurses is related to certain work-related variables. However, many other work-related variables were not associated with retirement planning and require further research. Overall, Chinese older retiring nurses must improve their retirement planning practices. © 2017 John Wiley & Sons Ltd.

  6. School Facilities Planning. Research Report Number 1974-2.

    ERIC Educational Resources Information Center

    National School Boards Association, Washington, DC.

    Literature reviewed in this report is intended to help school boards reconsider conventional approaches to school facilities planning. A blueprint is presented for good relationships between decision-makers and architects, explaining a sequence for the planning and construction process and the roles each party should fulfill to work successfully.…

  7. FY 1987 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less

  8. Phonological and Executive Working Memory in L2 Task-Based Speech Planning and Performance

    ERIC Educational Resources Information Center

    Wen, Zhisheng

    2016-01-01

    The present study sets out to explore the distinctive roles played by two working memory (WM) components in various aspects of L2 task-based speech planning and performance. A group of 40 post-intermediate proficiency level Chinese EFL learners took part in the empirical study. Following the tenets and basic principles of the…

  9. School Desegregation Plans That Work. Contributions to the Study of Education, Number 10.

    ERIC Educational Resources Information Center

    Willie, Charles Vert; And Others

    This policy study reviews American school desegregation plans in general and in four cities (Atlanta, Boston, Milwaukee, and Seattle) in particular. Chapter 1 focuses on relevant court decisions from 1954 to the present. Chapter 2 encapsulates the interaction of States, communities, and courts and presents the study's criteria for plan…

  10. Model Checking the Remote Agent Planner

    NASA Technical Reports Server (NTRS)

    Khatib, Lina; Muscettola, Nicola; Havelund, Klaus; Norvig, Peter (Technical Monitor)

    2001-01-01

    This work tackles the problem of using Model Checking for the purpose of verifying the HSTS (Scheduling Testbed System) planning system. HSTS is the planner and scheduler of the remote agent autonomous control system deployed in Deep Space One (DS1). Model Checking allows for the verification of domain models as well as planning entries. We have chosen the real-time model checker UPPAAL for this work. We start by motivating our work in the introduction. Then we give a brief description of HSTS and UPPAAL. After that, we give a sketch for the mapping of HSTS models into UPPAAL and we present samples of plan model properties one may want to verify.

  11. Eastern Washington Intermodal Transportation Study Scope of Work

    DOT National Transportation Integrated Search

    1993-02-04

    This document presents a detailed Scope of Work to guide implementation of : the Eastern Washington Intermodal Transportation Study. Included is a : description of project management and staff responsibilities, a detailed work : plan and timetable fo...

  12. PDDL4J: a planning domain description library for java

    NASA Astrophysics Data System (ADS)

    Pellier, D.; Fiorino, H.

    2018-01-01

    PDDL4J (Planning Domain Description Library for Java) is an open source toolkit for Java cross-platform developers meant (1) to provide state-of-the-art planners based on the Pddl language, and (2) to facilitate research works on new planners. In this article, we present an overview of the Automated Planning concepts and languages. We present some planning systems and their most significant applications. Then, we detail the Pddl4j toolkit with an emphasis on the available informative structures, heuristics and search algorithms.

  13. Orbital Express Mission Operations Planning and Resource Management using ASPEN

    NASA Technical Reports Server (NTRS)

    Chouinard, Caroline; Knight, Russell; Jones, Grailing; Tran, Daniel

    2008-01-01

    As satellite equipment and mission operations become more costly, the drive to keep working equipment running with less man-power rises.Demonstrating the feasibility of autonomous satellite servicing was the main goal behind the Orbital Express (OE) mission. Planning the satellite mission operations for OE required the ability to create a plan which could be executed autonomously over variable conditions. The Automated-Scheduling and Planning Environment (ASPEN)tool, developed at the Jet Propulsion Laboratory, was used to create the schedule of events in each daily plan for the two satellites of the OE mission. This paper presents an introduction to the ASPEN tool, the constraints of the OE domain, the variable conditions that were presented within the mission, and the solution to operations that ASPEN provided. ASPEN has been used in several other domains, including research rovers, Deep Space Network scheduling research, and in flight operations for the ASE project's EO1 satellite. Related work is discussed, as are the future of ASPEN and the future of autonomous satellite servicing.

  14. Manpower Planning for Municipal Wastewater Treatment in Texas, LP-8.

    ERIC Educational Resources Information Center

    Texas State Dept. of Water Resources, Austin.

    This report presents the implementation results of a pilot test of a manpower planning methodology developed by the U.S. Environmental Protection Agency (EPA), Office of Water Programs. Project outputs and projections are described and illustrated in sections of the report dealing with work to be done, organizational staffing plan, transfers and…

  15. A Bibliography of Literature on Planned or Implemented Automated Library Projects, Part I; Volume 9, World Survey Series.

    ERIC Educational Resources Information Center

    Patrinostro, Frank S., Comp.; Sanders, Nancy P., Ed.

    The primary purposes of this bibliography are to present an overview of published works which relate to the use of new technologies in library operations, to call attention to a number of valuable reference works published on the subject, and to assist librarians and library systems scientists who are engaged in the planning and/or implementation…

  16. WORKSHOP ON ORGANIZATION AND OPERATION OF COOPERATIVE WORK EXPERIENCE PROGRAMS IN TRADE AND INDUSTRIAL EDUCATION. (TUSKEGEE INSTITUTE, AUGUST 14-SEPTEMBER 1, 1967). FINAL REPORT.

    ERIC Educational Resources Information Center

    HARRIS, JAMES N.; SHERARD, AUSTELL O.

    THIRTY-NINE TRADE AND INDUSTRIAL AND VOCATIONAL TECHNICAL TEACHERS AND SUPERVISORS FROM 19 STATES PARTICIPATED IN A WORKSHOP TO PLAN AND EXECUTE A COMPREHENSIVE EXAMINATION AND EVALUATION OF THE COOPERATIVE WORK EXPERIENCE PLAN OF EDUCATION RELATIVE TO TRADE AND INDUSTRIAL EDUCATION. THE WORKSHOP ORGANIZATION INCLUDED CONSULTANT PRESENTATIONS,…

  17. The 30/20 GHz flight experiment system, phase 2. Volume 4: Experiment system development plan

    NASA Technical Reports Server (NTRS)

    Bronstein, L.; Kawamoto, Y.; Riberich, J. J.; Scope, J. R.; Forman, B. J.; Bergman, S. G.; Reisenfeld, S.

    1981-01-01

    The development plan for the 30/20 GHz flight experiment system is presented. A master program schedule with detailed development plans for each subsystem is planned with careful attention given to how technology items to ensure a minimal risk. The work breakdown structure shows the organization of the program management with detailed task definitions. The ROM costs based on the development plan are also given.

  18. Working Definitions of Terms for the Bilingual Instructional Features Study. Planning Paper 1. Bilingual Instructional Features Planning Study.

    ERIC Educational Resources Information Center

    Nieves-Squires, Sarah; Goodrich, Robert L.

    This report is one of five submitted as products of a "Study Designed to Assist Planning of Research on Significant Instructional Features in Bilingual Education Programs." The reports are intended to assist the National Institute of Education (NIE) in its plans for a major new research study in bilingual education. The present volume is…

  19. Application of scenario analysis and multiagent technique in land-use planning: a case study on Sanjiang wetlands.

    PubMed

    Yu, Huan; Ni, Shi-Jun; Kong, Bo; He, Zheng-Wei; Zhang, Cheng-Jiang; Zhang, Shu-Qing; Pan, Xin; Xia, Chao-Xu; Li, Xuan-Qiong

    2013-01-01

    Land-use planning has triggered debates on social and environmental values, in which two key questions will be faced: one is how to see different planning simulation results instantaneously and apply the results back to interactively assist planning work; the other is how to ensure that the planning simulation result is scientific and accurate. To answer these questions, the objective of this paper is to analyze whether and how a bridge can be built between qualitative and quantitative approaches for land-use planning work and to find out a way to overcome the gap that exists between the ability to construct computer simulation models to aid integrated land-use plan making and the demand for them by planning professionals. The study presented a theoretical framework of land-use planning based on scenario analysis (SA) method and multiagent system (MAS) simulation integration and selected freshwater wetlands in the Sanjiang Plain of China as a case study area. Study results showed that MAS simulation technique emphasizing quantitative process effectively compensated for the SA method emphasizing qualitative process, which realized the organic combination of qualitative and quantitative land-use planning work, and then provided a new idea and method for the land-use planning and sustainable managements of land resources.

  20. Application of Scenario Analysis and Multiagent Technique in Land-Use Planning: A Case Study on Sanjiang Wetlands

    PubMed Central

    Ni, Shi-Jun; He, Zheng-Wei; Zhang, Cheng-Jiang; Zhang, Shu-Qing; Pan, Xin; Xia, Chao-Xu; Li, Xuan-Qiong

    2013-01-01

    Land-use planning has triggered debates on social and environmental values, in which two key questions will be faced: one is how to see different planning simulation results instantaneously and apply the results back to interactively assist planning work; the other is how to ensure that the planning simulation result is scientific and accurate. To answer these questions, the objective of this paper is to analyze whether and how a bridge can be built between qualitative and quantitative approaches for land-use planning work and to find out a way to overcome the gap that exists between the ability to construct computer simulation models to aid integrated land-use plan making and the demand for them by planning professionals. The study presented a theoretical framework of land-use planning based on scenario analysis (SA) method and multiagent system (MAS) simulation integration and selected freshwater wetlands in the Sanjiang Plain of China as a case study area. Study results showed that MAS simulation technique emphasizing quantitative process effectively compensated for the SA method emphasizing qualitative process, which realized the organic combination of qualitative and quantitative land-use planning work, and then provided a new idea and method for the land-use planning and sustainable managements of land resources. PMID:23818816

  1. Planning status report: water resources appraisal for hydroelectric licensing, Potomac River basin, Pennsylvania, Maryland, West Virginia, Virginia, and District of Columbia

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1980-01-01

    Updated information on water resources in the Potomac River Basin is presented for use by the FERC and its staff when considering hydroelectric licensing and other work. The report presents data on water resource developments, existing and potential, and on water use by existing and projected steam-electric generating facilities. Past and present planning studies are summarized.

  2. Career Planning and Placement in the Small College. Proceedings of the Annual Conference (3rd, Alma College, Michigan, May 9-11, 1979).

    ERIC Educational Resources Information Center

    Riser-Schock, Ginny, Ed.

    Seventeen presentations made at the third annual conference on career planning and placement in the small college are presented. The thrust of the conference was aimed at cooperation and sharing of ideas of professionals working in one- or two-person offices within the constraints of a limited budget. Among the presentations included are (1)…

  3. AdaNET research plan

    NASA Technical Reports Server (NTRS)

    Mcbride, John G.

    1990-01-01

    The mission of the AdaNET research effort is to determine how to increase the availability of reusable Ada components and associated software engineering technology to both private and Federal sectors. The effort is structured to define the requirements for transfer of Federally developed software technology, study feasible approaches to meeting the requirements, and to gain experience in applying various technologies and practices. The overall approach to the development of the AdaNET System Specification is presented. A work breakdown structure is presented with each research activity described in detail. The deliverables for each work area are summarized. The overall organization and responsibilities for each research area are described. The schedule and necessary resources are presented for each research activity. The estimated cost is summarized for each activity. The project plan is fully described in the Super Project Expert data file contained on the floppy disk attached to the back cover of this plan.

  4. Integrated Workforce Planning Model: A Proof of Concept

    NASA Technical Reports Server (NTRS)

    Guruvadoo, Eranna K.

    2001-01-01

    Recently, the Workforce and Diversity Management Office at KSC have launched a major initiative to develop and implement a competency/skill approach to Human Resource management. As the competency/skill dictionary is being elaborated, the need for a competency-based workforce-planning model is recognized. A proof of concept for such a model is presented using a multidimensional data model that can provide the data infrastructure necessary to drive intelligent decision support systems for workforce planing. The components of competency-driven workforce planning model are explained. The data model is presented and several schemes that would support the workforce-planning model are presented. Some directions and recommendations for future work are given.

  5. Camp Minden Fact Sheet August 2015

    EPA Pesticide Factsheets

    On August 13, 2015, The Louisiana Military Department (LMD) led an Environmental Workshop presenting details on the future Work Plan and Quality Assurance Sampling plan for the site. The destruction of the M6 and CBI will happen in 3 phases.

  6. Evaluation of the current landscape of respiratory nurse specialists in the UK: planning for the future needs of patients.

    PubMed

    Yorke, Janelle; Prigmore, Sam; Hodson, Matt; Stonham, Carol; Long, Hannah; Bellhouse, Sarah; Fletcher, Monica; Edwards, Sheila

    2017-01-01

    The National Health Service currently faces significant challenges and must optimise effective workforce planning and management. There are increasing concerns regarding poor workforce planning for respiratory medicine; a greater understanding of the role of respiratory nurse specialists will inform better workforce planning and management. This was a survey study. Two surveys were administered: an organisational-level survey and an individual respiratory nurse survey. There were 148 and 457 respondents to the organisational and individual nurse survey, respectively. Four main themes are presented: (1) breadth of service provided; (2) patient care; (3) work environment; and (4) succession planning. The majority of work conducted by respiratory nurse specialists relates to patient care outside the secondary care setting including supporting self-management in the home, supporting patients on home oxygen, providing hospital-at-home services and facilitating early discharge from acute care environments. Yet, most respiratory nursing teams are employed by secondary care trusts and located within acute environments. There was evidence of multidisciplinary working, although integrated care was not prominent in the free-text responses. High workload was reported with one-quarter of nursing teams short-staffed. Respiratory nurses reported working unpaid extra hours and a lack of administrative support that often took them away from providing direct patient care. Nearly half of the present sample either plan to retire or are eligible for retirement within 10 years. This survey report provides a current snapshot of the respiratory nurse specialist workforce in the UK. This workforce is an ageing population; the results from this survey can be used to inform succession planning and to ensure a viable respiratory nurse specialist workforce in future.

  7. Evaluation of the current landscape of respiratory nurse specialists in the UK: planning for the future needs of patients

    PubMed Central

    Yorke, Janelle; Prigmore, Sam; Hodson, Matt; Stonham, Carol; Long, Hannah; Bellhouse, Sarah; Fletcher, Monica; Edwards, Sheila

    2017-01-01

    Introduction The National Health Service currently faces significant challenges and must optimise effective workforce planning and management. There are increasing concerns regarding poor workforce planning for respiratory medicine; a greater understanding of the role of respiratory nurse specialists will inform better workforce planning and management. Methods This was a survey study. Two surveys were administered: an organisational-level survey and an individual respiratory nurse survey. Results There were 148 and 457 respondents to the organisational and individual nurse survey, respectively. Four main themes are presented: (1) breadth of service provided; (2) patient care; (3) work environment; and (4) succession planning. The majority of work conducted by respiratory nurse specialists relates to patient care outside the secondary care setting including supporting self-management in the home, supporting patients on home oxygen, providing hospital-at-home services and facilitating early discharge from acute care environments. Yet, most respiratory nursing teams are employed by secondary care trusts and located within acute environments. There was evidence of multidisciplinary working, although integrated care was not prominent in the free-text responses. High workload was reported with one-quarter of nursing teams short-staffed. Respiratory nurses reported working unpaid extra hours and a lack of administrative support that often took them away from providing direct patient care. Nearly half of the present sample either plan to retire or are eligible for retirement within 10 years. Conclusions This survey report provides a current snapshot of the respiratory nurse specialist workforce in the UK. This workforce is an ageing population; the results from this survey can be used to inform succession planning and to ensure a viable respiratory nurse specialist workforce in future. PMID:28912954

  8. The IAU Division A Working Group on the Third Realization of the ICRF: Background, Goals, Plans

    NASA Astrophysics Data System (ADS)

    Gaume, Ralph

    2015-08-01

    The XXVIII General Assembly of the IAU (Beijing, 2012) established the Division A Working Group on the Third Realization of the International Celestial Reference Frame (ICRF). The adopted charter of the ICRF3 Working Group includes a commitment to report on the implementation and execution plans for ICRF3 during the XXIX General Assembly of the IAU along with a targeted completion and presentation of ICRF3 in 2018 to the XXX General Assembly for adoption. This talk will discuss the background, purpose, and overall implementation plan for ICRF3, and motivate the concept, currently under consideration by the ICRF3 Working Group, that future realizations of the ICRF be based on multi-frequency astrometric data, starting with ICRF3.

  9. Inhibition in movement plan competition: reach trajectories curve away from remembered and task-irrelevant present but not from task-irrelevant past visual stimuli.

    PubMed

    Moehler, Tobias; Fiehler, Katja

    2017-11-01

    The current study investigated the role of automatic encoding and maintenance of remembered, past, and present visual distractors for reach movement planning. The previous research on eye movements showed that saccades curve away from locations actively kept in working memory and also from task-irrelevant perceptually present visual distractors, but not from task-irrelevant past distractors. Curvature away has been associated with an inhibitory mechanism resolving the competition between multiple active movement plans. Here, we examined whether reach movements underlie a similar inhibitory mechanism and thus show systematic modulation of reach trajectories when the location of a previously presented distractor has to be (a) maintained in working memory or (b) ignored, or (c) when the distractor is perceptually present. Participants performed vertical reach movements on a computer monitor from a home to a target location. Distractors appeared laterally and near or far from the target (equidistant from central fixation). We found that reaches curved away from the distractors located close to the target when the distractor location had to be memorized and when it was perceptually present, but not when the past distractor had to be ignored. Our findings suggest that automatically encoding present distractors and actively maintaining the location of past distractors in working memory evoke a similar response competition resolved by inhibition, as has been previously shown for saccadic eye movements.

  10. Perspectives and Plans for Graduate Studies. 11. Engineering 1974. D. Mechanical Engineering. Report No. 74-21.

    ERIC Educational Resources Information Center

    Ontario Council on Graduate Studies, Toronto. Advisory Committee on Academic Planning.

    On the instruction of the Council of Ontario Universities, the Advisory Committee on Academic Planning in cooperation with the Committee of Ontario Deans of Engineering has conducted a planning assessment for doctoral work in mechanical engineering. This report presents as overview of the recommendations for each of the assessments conducted in…

  11. Phase I Investigations at the Former CCC/USDA Grain Storage Facility in Montgomery City, Missouri, in 2010-2011

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, Lorraine M.

    This report presents the technical findings of Phase I of Argonne’s studies. The Phase I field investigation was initiated on October 18, 2010. The work was conducted in accord with (1) the final site-specific Phase I Work Plan for Montgomery City (Argonne 2010; approved by the MDNR [2010]); (2) applicable Missouri regulations; and (3) the standard operating procedures, quality assurance/quality control (QA/QC) measures, and general health and safety policies outlined in the Master Work Plan (Argonne 2002) for operations in Kansas, which was reviewed by the MDNR and accepted for current use. A draft master plan specific to work inmore » Missouri and a set of draft standard operating procedures are in review with the MDNR. The site-specific Work Plan for Montgomery City (Argonne 2010) (1) summarizes the pre-existing knowledge base for the Montgomery City investigation site compiled by Argonne and (2) describes the site-specific technical objectives and the intended scope of work developed for the first phase of the investigation. Three primary technical objectives were identified for the Phase I studies, as follows: 1. Update the presently identified inventory and status of private and public drinking water wells in the immediate vicinity of the former CCC/USDA grain storage facility, and sample the identified wells for volatile organic compounds (VOCs) and geochemical analyses. In conjunction with this effort, determine the present sources(s) of drinking water for all residents in an approximate 0.5-mi radius of the former CCC/USDA facility. 2. Investigate for possible evidence of a soil source of carbon tetrachloride contamination in the unconsolidated sediments beneath the former CCC/USDA facility that might affect the underlying bedrock aquifer units. 3. Obtain preliminary information on the site-specific lithologic and hydrologic characteristics of the unconsolidated sediments overlying bedrock at the former CCC/USDA grain storage location. Section 2 of this report describes the investigative methods used in the 2010-2011 studies and provides a chronological summary of the field events conducted. Section 3 presents a summary of the resulting field and laboratory data. These data, together with information presented in the site-specific Work Plan (Argonne 2010), are interpreted and integrated in Section 4 to (1) develop a preliminary conceptual model of the hydrogeologic framework affecting groundwater and potential contaminant migration in the vicinity of the former CCC/USDA facility and (2) serve as a basis for the initial consideration of contaminant levels and potential exposure pathways that might be of concern in the evaluation of risks to human health, public welfare, and the environment. The working conclusions drawn from the 2010-2011 studies are presented, along with recommendations, in Section 5.« less

  12. Funnel Libraries for Real-Time Robust Feedback Motion Planning

    DTIC Science & Technology

    2016-07-21

    motion plans for a robot that are guaranteed to suc- ceed despite uncertainty in the environment, parametric model uncertainty, and disturbances...resulting funnel library is then used to sequentially compose motion plans at runtime while ensuring the safety of the robot . A major advantage of...the work presented here is that by explicitly taking into account the effect of uncertainty, the robot can evaluate motion plans based on how vulnerable

  13. IDC Integrated Master Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clifford, David J.; Harris, James M.

    2014-12-01

    This is the IDC Re-Engineering Phase 2 project Integrated Master Plan (IMP). The IMP presents the major accomplishments planned over time to re-engineer the IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts. REVISIONS Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Re- engineering Project Team Initial delivery M. Harris

  14. Colombo Plan Intra-Regional Technician Training Colloquium (6th, Kuala Lumpur, Malaysia, April 21-25, 1975).

    ERIC Educational Resources Information Center

    Colombo Plan Bureau (Sri Lanka).

    Proceedings of the Sixth Colloquium on Intra-Regional Technical Training sponsored jointly by the Colombo Plan and the Government of Malaysia are presented in this report. Four working papers are presented centered around three main areas of concern: influence of technical education on economic development; how the status of technicians could be…

  15. Employee Perceptions of Their Organization's Level of Emergency Preparedness Following a Brief Workplace Emergency Planning Educational Presentation.

    PubMed

    Renschler, Lauren A; Terrigino, Elizabeth A; Azim, Sabiya; Snider, Elsa; Rhodes, Darson L; Cox, Carol C

    2016-06-01

    A brief emergency planning educational presentation was taught during work hours to a convenience sample of employees of various workplaces in Northern Missouri, USA. Participants were familiarized with details about how an emergency plan is prepared by management and implemented by management-employee crisis management teams - focusing on both employee and management roles. They then applied the presentation information to assess their own organization's emergency preparedness level. Participants possessed significantly (p < 0.05) higher perceptions of their organization's level of emergency preparedness than non-participants. It is recommended that an assessment of organizational preparedness level supplement emergency planning educational presentations in order to immediately apply the material covered and encourage employees to become more involved in their organization's emergency planning and response. Educational strategies that involve management-employee collaboration in activities tailored to each workplace's operations and risk level for emergencies should be implemented.

  16. Louisiana statewide intermodal plan : working paper on water, rail, and intermodal freight transportation

    DOT National Transportation Integrated Search

    1995-07-01

    This report presents material developed by the LSU National Ports and Waterways Institute : within the framework of the study and report for the Louisiana Statewide Model Intermodal Plan. : The Institutes participation has concentrated on the frei...

  17. Work Plan for Site-Wide Assessment for Petroleum Product (Operable Unit 2) May 2012

    EPA Pesticide Factsheets

    May 2012 redlined plan assessment of light non-aqueous phase liquid (LNAPL) petroleum product potentially present at the LCP Chemicals Superfund Site, GA. Region ID: 04 DocID: 10922562, DocDate: 05-09-2012

  18. Robot path planning algorithm based on symbolic tags in dynamic environment

    NASA Astrophysics Data System (ADS)

    Vokhmintsev, A.; Timchenko, M.; Melnikov, A.; Kozko, A.; Makovetskii, A.

    2017-09-01

    The present work will propose a new heuristic algorithms for path planning of a mobile robot in an unknown dynamic space that have theoretically approved estimates of computational complexity and are approbated for solving specific applied problems.

  19. Miami Valley ITS : early deployment plan : recommended system architecture and technologies working paper

    DOT National Transportation Integrated Search

    1997-08-01

    This system architecture paper will discuss proposed architectures for the four infrastructure oriented program areas defined by the project team and presented in the Strategic Deployment Plan (August 1997). This report will concentrate on defi...

  20. The working patterns and retirement plans of general dental practitioners in a Midlands Health Authority.

    PubMed

    Morris, John; Harrison, Rachel; Caswell, Martin; Lunn, Howard

    2002-10-01

    With the problems of access to NHS primary dental care services in the last few years attention has focused on manpower considerations for dentistry. This paper presents the results of a simple survey of general dental practitioners in South Staffordshire. The response rate was 88%. Most dentists (76%) reported working over 30 hours a week. A small number reported working more than 50 hours a week. Woman dentists were more likely to report working fewer than 31 hours a week. Younger male dentists tended to work longer hours than older male dentists, whereas younger women dentists tended to work fewer hours than older women. The reported retirement plans suggested that around 16% of dentists in their 40s and 50s were planning to retire before 60. The findings add weight to the view that woman dentists tend to work fewer hours but studies of cohorts are required to examine the impact of premature retirement and the reasons behind this apparent gender difference.

  1. Working Memory and Cognitive Flexibility Mediates Visuoconstructional Abilities in Older Adults with Heterogeneous Cognitive Ability.

    PubMed

    Ávila, Rafaela T; de Paula, Jonas J; Bicalho, Maria A; Moraes, Edgar N; Nicolato, Rodrigo; Malloy-Diniz, Leandro F; Diniz, Breno S

    2015-05-01

    Previous studies suggest that executive functions influence the performance on visuoconstructional tasks. This study aims to investigate whether the relationship between planning ability and the copy of complex figures is mediated by distinct components of executive functions (i.e., working memory, inhibitory control and cognitive flexibility). We included a 129 older adults with Alzheimer's disease (n=36, AD), mild cognitive impairment (MCI, n=67), and with no evidence of cognitive impairment (controls, n=26). We evaluated the mediation effect of planning abilities, working memory, cognitive flexibility and inhibitory control on visuoconstructional tasks using a multiple mediation models. We found a significant direct effect of planning on visuoconstructional abilities and a partial mediation effect of working memory and cognitive flexibility on visuoconstructional abilities. The present results indicate that the performance on visuoconstructional task is mediated by multiple interrelated executive functions components, in particular working memory and cognitive flexibility.

  2. Lunar-Ultraviolet Telescope Experiment (LUTE) integrated program plan

    NASA Technical Reports Server (NTRS)

    Smith, Janice F. (Compiler); Forrest, Larry

    1993-01-01

    A detailed Lunar Ultraviolet Telescope Experiment (LUTE) program plan representing major decisions and tasks leading to those decisions for program execution are presented. The purpose of this task was to develop an integrated plan of project activities for the LUTE project, and to display the plan as an integrated network that shows the project activities, all critical interfaces, and schedules. The integrated network will provide the project manager with a frame work for strategic planning and risk management throughout the life of the project.

  3. The Development of the Comic Spirit in 17th Century England from James Shirley to William Congreve. Curriculum Projects, April 7-June 16, 1992. The Huntington Theatre Company Master Works Study in Restoration Comedy.

    ERIC Educational Resources Information Center

    Huntington Theatre Co., Boston, MA.

    Developed by the participants of the Huntington Theatre Company's Master Works Study in Restoration Comedy, this collection presents one-day lesson plans and curriculum projects for teaching Restoration comedy. The collection offers 15 one-day lesson plans and 15 curriculum projects (ranging over several weeks) suitable for secondary school…

  4. Planning documents: a business planning strategy.

    PubMed

    Kaehrle, P A

    2000-06-01

    Strategic planning and business plan development are essential nursing management skills in today's competitive, fast paced, continually changing health care environment. Even in times of great uncertainty, nurse managers need to plan and forecast for the future. A well-written business plan allows nurse managers to communicate their expertise and proactively contribute to the programmatic decisions and changes occurring within their patient population or service area. This article presents the use of planning documents as a practical, strategic business planning strategy. Although the model addresses orthopedic services specifically, nurse managers can gain an understanding and working knowledge of planning concepts that can be applied to all patient populations.

  5. Co-Planning for Co-Teaching: Time-Saving Routines That Work in Inclusive Classrooms (ASCD Arias)

    ERIC Educational Resources Information Center

    Wilson, Gloria Lodato

    2016-01-01

    How do you ensure that your co-teaching strategies make the most of the time that you and your co-teaching partner have in the classroom? The answer is co-planning, which will dramatically and efficiently increase the effectiveness of your instruction. In "Co-Planning for Co-Teaching," author Gloria Lodato Wilson presents time-saving…

  6. International Workshop on Communications in Family Planning Programs (Teheran, June 6-18, 1970). Final Report.

    ERIC Educational Resources Information Center

    Blake, Robert R., Ed.; Wolfe, Suzanne, R., Ed.

    This report presents some of the proceedings of a workshop on communications in family planning programs held in Teheran, Iran. A total of 82 participants from 15 Mid-Eastern and African countries attended. The purpose of the workshop was to assist each country to prepare a work plan for information and education activities related to population…

  7. Two-Year Transitional Plan. State of Minnesota Developmental Disabilities. October 1, 1989-September 30, 1991. Accountability.

    ERIC Educational Resources Information Center

    Minnesota State Planning Agency, St. Paul.

    The Minnesota 2-year state plan presents a review of the existing service delivery system for: (1) the provision of services to persons with developmental disabilities and their families; (2) a continuing response to priority areas specified in federal legislation; and (3) development of a work plan leading toward development of a Three-Year State…

  8. Long Range Facilities Planning and Design Implementation for Students with Disabilities: A Guide for New Jersey School Districts

    ERIC Educational Resources Information Center

    Lowenkron, Ruth; Ponessa, Joan

    2005-01-01

    The long range facilities planning (LRFP) process presents a wonderful opportunity for New Jersey's school districts to re-examine and strengthen their long term planning for educational adequacy in 21st century school facilities. It provides an opportunity for districts to work closely with the special education community to ensure that New…

  9. Distributed Episodic Exploratory Planning (DEEP)

    DTIC Science & Technology

    2012-04-01

    other papers , reports and presentations, as referenced in the bibliography, and is only summarized in this report. 15. SUBJECT TERMS Planning...repository feature space. Much of the work is documented in detail in other papers , reports and presentations, as referenced in the bibliography, and is...DISTRIBUTION UNLIMITED 4 released in May 2006 a revolutionary vision paper titled “C2 Enabling Concepts” (Braun, 2006) depicting what a potential

  10. Policy Document on Earth Observation for Urban Planning and Management: State of the Art and Recommendations for Application of Earth Observation in Urban Planning

    NASA Technical Reports Server (NTRS)

    Nichol, Janet; King, Bruce; Xiaoli, Ding; Dowman, Ian; Quattrochi, Dale; Ehlers, Manfred

    2007-01-01

    A policy document on earth observation for urban planning and management resulting from a workshop held in Hong Kong in November 2006 is presented. The aim of the workshop was to provide a forum for researchers and scientists specializing in earth observation to interact with practitioners working in different aspects of city planning, in a complex and dynamic city, Hong Kong. A summary of the current state of the art, limitations, and recommendations for the use of earth observation in urban areas is presented here as a policy document.

  11. Intelligent control of a planning system for astronaut training.

    PubMed

    Ortiz, J; Chen, G

    1999-07-01

    This work intends to design, analyze and solve, from the systems control perspective, a complex, dynamic, and multiconstrained planning system for generating training plans for crew members of the NASA-led International Space Station. Various intelligent planning systems have been developed within the framework of artificial intelligence. These planning systems generally lack a rigorous mathematical formalism to allow a reliable and flexible methodology for their design, modeling, and performance analysis in a dynamical, time-critical, and multiconstrained environment. Formulating the planning problem in the domain of discrete-event systems under a unified framework such that it can be modeled, designed, and analyzed as a control system will provide a self-contained theory for such planning systems. This will also provide a means to certify various planning systems for operations in the dynamical and complex environments in space. The work presented here completes the design, development, and analysis of an intricate, large-scale, and representative mathematical formulation for intelligent control of a real planning system for Space Station crew training. This planning system has been tested and used at NASA-Johnson Space Center.

  12. Risk identification and reduction in integrated product teams

    NASA Technical Reports Server (NTRS)

    Batson, Robert G.

    1993-01-01

    This brief report summarizes research and planning conducted during Summer 1993 for MSFC on the subjects of risk identification, assessment, and management. Research findings are presented, citing useful references. The major output of this work, the AXAF-S Project Risk Management Plan is outlined.

  13. Microgravity strategic planning exercise

    NASA Technical Reports Server (NTRS)

    Halpern, Richard; Downey, Jim; Harvey, Harold

    1991-01-01

    The Center for Space and Advanced Technology supported a planning exercise for the Microgravity Program management at the Marshall Space Flight Center. The effort focused on the status of microgravity work at MSFC and elsewhere with the objective of preparing a goal-oriented strategic planning document which could be used for informational/brochure purposes. The effort entailed numerous interactions and presentations with Field Center programmatic components and Headquarters personnel. Appropriate material was consolidated in a draft format for a MSFC Strategic Plan.

  14. PLANNING, PROGRAMMING, DESIGNING THE COMMUNITY COLLEGE, PROCEEDINGS OF A CONFERENCE SPONSORED BY THE COLLEGE OF ARCHITECTURE AND URBAN PLANNING AND THE CENTER FOR THE DEVELOPMENT OF COMMUNITY COLLEGE EDUCATION (UNIVERSITY OF WASHINGTON, APRIL 24-25, 1967).

    ERIC Educational Resources Information Center

    SONDALLE, MARVIN P.

    PARTICIPANTS AT THIS CONFERENCE DEFINED THE ESSENTIAL MAJOR STEPS IN FACILITY PLANNING FOR A NEW CAMPUS AS SITE SELECTION, FINANCIAL PROGRAMMING, CAMPUS PLANNING, AND CONSTRUCTION. THEY ALSO AGREED THAT THE COLLEGE ADMINISTRATION AND THE ARCHITECTURAL STAFF MUST WORK TOGETHER AT EVERY STAGE OF THE PROGRAM. PRESENT TECHNIQUES OF ENROLLMENT…

  15. Safety assessment tool for construction zone work phasing plans

    DOT National Transportation Integrated Search

    2016-05-01

    The Highway Safety Manual (HSM) is the compilation of national safety research that provides quantitative methods for : analyzing highway safety. The HSM presents crash modification functions related to freeway work zone characteristics such as : wor...

  16. The space shuttle payload planning working groups. Volume 3: High energy astrophysics

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The findings of the High Energy Astrophysics working group of the space shuttle payload planning activity are presented. The objectives to be accomplished during space shuttle missions are defined as: (1) X-ray astronomy, (2) hard X-ray and gamma ray astronomy, and (3) cosmic ray astronomy. The instruments and test equipment required to accomplish the mission are identified. Recommendations for managing the installation of the equipment and conducting the missions are included.

  17. A-Train Mission Operations Working Group: CALIPSO Mission Status

    NASA Technical Reports Server (NTRS)

    Cisewski, Michael S.; MacDonnell, David G.; Queruel, Nadege; Verhappen, Carlous A.; Trepte, Charles R.

    2007-01-01

    This series of viewgraphs presents an introduction to the status of the Cloud-Aerosol Lidar and Infrared Pathfinder Satellite Observation (CALIPSO),lessons learned during CALIPSO inclination maneuvers, the planning for CALIPSO's inclination maneuver to take place in 2009, examines a decision whether to precess or not, the plans to change CALIPSO's pitch, and the plans to change CALIPSO's pitch from the viewpoint of the payload.

  18. Combined Release and Radiation Effects Satellite (CRRES) Experiment: Educational planning and coordination

    NASA Technical Reports Server (NTRS)

    Vaughan, William W.; Alzmann, Melanie

    1991-01-01

    The efforts conducted to provide educational planning and development support for the Combined Release and Radiation Satellite (CRRES) Experiment are summarized. Activities regarding the scientific working group and workshop development are presented including the preparation of descriptive information on the CRRES Project.

  19. Wet feet and sappy fingers: lessons learned from restoration work in the West Virginia highlands

    Treesearch

    Amy Cimarolli; David W. Saville

    2010-01-01

    This presentation summarizes our practical experiences from a decade of working with state and federal agencies and private landowners to protect, conserve, and restore the spruce forests and fir swamps of West Virginia. We present case studies that demonstrate the collaborative planning processes, site selection techniques, and restoration activities used in our...

  20. Space Weather Action Plan Solar Radio Burst Phase 1 Benchmarks and the Steps to Phase 2

    NASA Astrophysics Data System (ADS)

    Biesecker, D. A.; White, S. M.; Gopalswamy, N.; Black, C.; Love, J. J.; Pierson, J.

    2017-12-01

    Solar radio bursts, when at the right frequency and when strong enough, can interfere with radar, communication, and tracking signals. In severe cases, radio bursts can inhibit the successful use of radio communications and disrupt a wide range of systems that are reliant on Position, Navigation, and Timing services on timescales ranging from minutes to hours across wide areas on the dayside of Earth. The White House's Space Weather Action Plan asked for solar radio burst intensity benchmarks for an event occurrence frequency of 1 in 100 years and also a theoretical maximum intensity benchmark. The benchmark team has developed preliminary (phase 1) benchmarks for the VHF (30-300 MHz), UHF (300-3000 MHz), GPS (1176-1602 MHz), F10.7 (2800 MHz), and Microwave (4000-20000) bands. The preliminary benchmarks were derived based on previously published work. Limitations in the published work will be addressed in phase 2 of the benchmark process. In addition, deriving theoretical maxima requires additional work, where it is even possible to, in order to meet the Action Plan objectives. In this presentation, we will present the phase 1 benchmarks, the basis used to derive them, and the limitations of that work. We will also discuss the work that needs to be done to complete the phase 2 benchmarks.

  1. Multi-assortment rhythmic production planning and control

    NASA Astrophysics Data System (ADS)

    Skolud, B.; Krenczyk, D.; Zemczak, M.

    2015-11-01

    A method for production planning in a repetitive manufacturing system which allows for estimating the possibility of processing work orders in due time is presented. The difference between two approaches are presented; the first one one-piece flow elaborated in Toyota and the second one elaborated by authors that consists in defining sufficient conditions to filter all solutions and providing a set of admissible solutions for both the client and the producer. In the paper attention is focused on the buffer allocation. Illustrative examples are presented.

  2. Work and General Education.

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific, and Cultural Organization, Bangkok (Thailand). Regional Office for Education in Asia and the Pacific.

    Presentations and other materials are provided from the Asia and the Pacific Programme of Educational Innovation for Development (APEID) Planning and Review Meeting on Work as an Integral Part of General Education. The focus is on how education, through an orientation to work, could help to decrease the gravity of the problems of population…

  3. Working at the Ohio Aerospace Institute

    NASA Technical Reports Server (NTRS)

    Szabo, Hortenzia

    2004-01-01

    The Ohio Aerospace Institute is a wonderful place to work. I enjoy coming to work everyday knowing that I will be surrounded by smiling faces. My mentor, Mary Auzenne, is the Program Manager of the LERCIP College Internship Program, however, I spend most of my time working with Akua Soadwa, the Assistant Program Manager. She is in charge of planning, coordinating, and managing every event that is involved with the college internship program such as the socials, picnic, banquet, workshops, and research symposium. My job is to make her job easier. I help out with the planning, coordinating, and managing of these events. When I first got on board Akua was in the process of planning the second social for the interns. The social is a way for the interns to interact with one another as well as to find out more about where the other interns are working at NASA. We ordered the food, went shopping, and set up the Guerin House for the party. I made sign-in sheets, which helped us get a rough count of the attendees. The next event was the Technical Presentation Workshop and the Professional Development Workshop. These workshops are designed to enhance skills of the interns. We were there to sign people in and direct them to the room where the presentation was to take place. I also took pictures of the workshop and provided copies for the presenters, as well as our files.

  4. Manager's assistant systems for space system planning

    NASA Technical Reports Server (NTRS)

    Bewley, William L.; Burnard, Robert; Edwards, Gary E.; Shoop, James

    1992-01-01

    This paper describes a class of knowledge-based 'assistant' systems for space system planning. Derived from technology produced for the DARPA/USAF Pilot's Associate program, these assistant systems help the human planner by doing the bookkeeping to maintain plan data and executing the procedures and heuristics currently used by the human planner to define, assess, diagnose, and revise plans. Intelligent systems for Space Station Freedom assembly sequence planning and Advanced Launch System modeling will be presented as examples. Ongoing NASA-funded work on a framework supporting the development of such tools will also be described.

  5. Planning and simulation of medical robot tasks.

    PubMed

    Raczkowsky, J; Bohner, P; Burghart, C; Grabowski, H

    1998-01-01

    Complex techniques for planning and performing surgery revolutionize medical interventions. In former times preoperative planning of interventions usually took place in the surgeons mind. Today's new computer techniques allow the surgeon to discuss various operation methods for a patient and to visualize them three-dimensionally. The use of computer assisted surgical planning helps to get better results of a treatment and supports the surgeon before and during the surgical intervention. In this paper we are presenting our planning and simulation system for operations in maxillo-facial surgery. All phases of a surgical intervention are supported. Chapter 1 gives a description of the medical motivation for our planning system and its environment. In Chapter 2 the basic components are presented. The planning system is depicted in Chapter 3 and a simulation of a robot assisted surgery can be found in Chapter 4. Chapter 5 concludes the paper and gives a survey about our future work.

  6. Proposal and work plan to calibrate and verify a water-quality model to simulate effects of wastewater discharges to the Red River of the North at drought streamflow near Fargo, North Dakota, and Moorhead, Minnesota

    USGS Publications Warehouse

    Wesolowski, Edwin A.

    2000-01-01

    This report presents a proposal for conducting a water-quality modeling study at drought streamflow, a detailed comprehensive plan for collecting the data, and an annual drought-formation monitoring plan. A 30.8 mile reach of the Red River of the North receives treated wastewater from plants at Fargo, North Dakota, and Moorhead, Minnesota, and streamflow from the Sheyenne River. The water-quality modeling study will evaluate the effects of continuous treated-wastewater discharges to the study reach at drought streamflow. The study will define hydraulic characteristics and reaeration and selected reaction coefficients and will calibrate and verity a model.The study includes collecting synoptic water-quality samples for various types of analyses at a number of sites in the study reach. Dye and gas samples will be collected for traveltime and reaeration measurements. Using the Lagrangian reference frame, synoptic water-quality samples will be collected for analysis of nutrients, chlorophyll a, alkalinity, and carbonaceous biochemical oxygen demand. Field measurements will be made of specific conductance, pH, air and water temperature, dissolved oxygen, and sediment oxygen demand. Two sets of water-quality data will be collected. One data set will be used to calibrate the model, and the other data set will be used to verity the model.The DAFLOW/BLTM models will be used to evaluate the effects of the treated wastewater on the water quality of the river. The model will simulate specific conductance, temperature, dissolved oxygen, carbonaceous biochemical oxygen demand, total nitrogen (organic, ammonia, nitrite, nitrate), total orthophosphorus, total phosphorus, and phytoplankton as chlorophyll a.The work plan identifies and discusses the work elements needed for accomplishing the data collection for the study. The work elements specify who will provide personnel, vehicles, instruments, and supplies needed during data collection. The work plan contains instructions for data collection; inventory lists of needed personnel, vehicles, instruments, and supplies; and examples of computations for determining quantities of tracer to be injected into the stream. The work plan also contains an annual drought-formation monitoring plan that includes a 9-month time line that specifies when essential planning actions must occur before actual project start up. Drought streamflows are rare. The annual drought-formation monitoring plan is presented to assist project planning by providing early warning that conditions are favorable to produce drought streamflow. The plan to monitor drought-forming conditions discusses the drought indices to be monitored. To establish a baseline, historic values for some of the drought indices for selected years were reviewed. An annual review of the drought indices is recommended.

  7. Working on the Work: An Action Plan for Teachers, Principals, and Superintendents. The Jossey-Bass Education Series.

    ERIC Educational Resources Information Center

    Schlechty, Phillip C.

    This book, which is a companion to the books, "Shaking up the Schoolhouse" and "Inventing Better Schools," presents the Working on the Work (WOW) framework for improving student performance by improving the quality of schoolwork. Field-tested in schools nationwide, the framework describes the 12 essential components of a WOW…

  8. Innovation and Diffusion--An Anthropological View.

    ERIC Educational Resources Information Center

    du Toit, Brian M.

    This chapter presents the anthropological theory of innovation and diffusion, and applies it to the problem of implementing planned change within the instructional development process. The work of Barnett and others on culture and planned culture change is described and applied to the educational system and the classroom environment. Barnett's…

  9. Guidelines for Implementing a Real Estate Cooperative Education Program.

    ERIC Educational Resources Information Center

    Pearson, Thomas R.

    Background information and guidelines are provided for the development of cooperative education programs for real estate industry personnel. The first section outlines the operation of cooperative education programs and presents two organizational plans: the alternating plan, where students attend class full-time and work full-time during…

  10. Planning Additions to Academic Library Buildings: A Seamless Approach.

    ERIC Educational Resources Information Center

    Hawthorne, Pat, Ed.; Martin, Ron G., Ed.

    This document presents three case studies that illustrate how library staffs and architectural design teams can work together to plan additions that are successful solutions to building problems. The case studies cover the experiences of Hope College, Holland, Michigan (David Jensen, Margaret Jensen), Western Maryland College, Westminster,…

  11. Merit Pay: A Plan That Works.

    ERIC Educational Resources Information Center

    McKay, John R.

    An overview is provided of Sumter Area Technical College's (SATC's) successful faculty evaluation and merit pay plan. Following introductory material on SATC, a discussion is presented of the reasoning behind resistance to efforts to tie faculty evaluation to merit pay. Next, SATC's evaluation system is set in the context of the college's overall…

  12. A Wireless Communications Laboratory on Cellular Network Planning

    ERIC Educational Resources Information Center

    Dawy, Z.; Husseini, A.; Yaacoub, E.; Al-Kanj, L.

    2010-01-01

    The field of radio network planning and optimization (RNPO) is central for wireless cellular network design, deployment, and enhancement. Wireless cellular operators invest huge sums of capital on deploying, launching, and maintaining their networks in order to ensure competitive performance and high user satisfaction. This work presents a lab…

  13. Options for Parallelizing a Planning and Scheduling Algorithm

    NASA Technical Reports Server (NTRS)

    Clement, Bradley J.; Estlin, Tara A.; Bornstein, Benjamin D.

    2011-01-01

    Space missions have a growing interest in putting multi-core processors onboard spacecraft. For many missions processing power significantly slows operations. We investigate how continual planning and scheduling algorithms can exploit multi-core processing and outline different potential design decisions for a parallelized planning architecture. This organization of choices and challenges helps us with an initial design for parallelizing the CASPER planning system for a mesh multi-core processor. This work extends that presented at another workshop with some preliminary results.

  14. Structural dynamics division research and technology accomplishments for FY 1993 and plans for FY 1994

    NASA Technical Reports Server (NTRS)

    Wynne, Eleanor C.

    1994-01-01

    The purpose is to present the Structural Dynamics Division's research accomplishments for F.Y. 1993 and research plans for F.Y. 1994. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to 5-year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  15. Structural dynamics division research and technology accomplishments for FY 1989 and plans for FY 1990

    NASA Technical Reports Server (NTRS)

    Smith, Jacqueline G.; Gardner, James E.

    1990-01-01

    The purpose is to present the Structural Dynamics Division's research accomplishments for FY 1989 and research plans for FY 1990. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  16. Loads and Aeroelasticity Division research and technology accomplishments for FY 1986 and plans for FY 1987

    NASA Technical Reports Server (NTRS)

    Gardner, James E.; Dixon, S. C.

    1987-01-01

    The Loads and Aeroelasticity Division's research accomplishments for FY 86 and research plans for FY 87 are presented. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  17. Broadcasting satellite feeder links - Characteristics and planning

    NASA Technical Reports Server (NTRS)

    Kiebler, J. W.

    1982-01-01

    The paper presents the results of recent studies by the Feeder Link Sub-Working Group of the FCC Advisory Committee for the 1983 Regional Administrative Radio Conference (RARC). These studies conclude that specification of a few key parameters will make feeder link planning relatively straightforward. Feeder links can be located anywhere within a country if satellite orbit locations are separated by 10 deg for adjacent service areas and key parameter values presented in the paper are adopted. Colocated satellites serving a common service area need special attention to attain sufficient isolation between a desired channel and its adjacent cross-polarized channels and alternate co-polarized channels. In addition to presenting planning conclusions by the Advisory Committee, the paper presents and analyzes actions of the International Radio Consultative Committee's Conference Planning Meeting (CPM) concerning feeder links. The CPM reached conclusions similar to, and compatible with, those of the Advisory Committee.

  18. A preliminary model of work during initial examination and treatment planning appointments.

    PubMed

    Irwin, J Y; Torres-Urquidy, M H; Schleyer, T; Monaco, V

    2009-01-10

    Objective This study's objective was to formally describe the work process for charting and treatment planning in general dental practice to inform the design of a new clinical computing environment.Methods Using a process called contextual inquiry, researchers observed 23 comprehensive examination and treatment planning sessions during 14 visits to 12 general US dental offices. For each visit, field notes were analysed and reformulated as formalised models. Subsequently, each model type was consolidated across all offices and visits. Interruptions to the workflow, called breakdowns, were identified.Results Clinical work during dental examination and treatment planning appointments is a highly collaborative activity involving dentists, hygienists and assistants. Personnel with multiple overlapping roles complete complex multi-step tasks supported by a large and varied collection of equipment, artifacts and technology. Most of the breakdowns were related to technology which interrupted the workflow, caused rework and increased the number of steps in work processes.Conclusion Current dental software could be significantly improved with regard to its support for communication and collaboration, workflow, information design and presentation, information content, and data entry.

  19. The space shuttle payload planning working groups. Volume 2: Atmospheric and space physics

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The findings of the Atmospheric and Space Physics working group of the space shuttle mission planning activity are presented. The principal objectives defined by the group are: (1) to investigate the detailed mechanisms which control the near-space environment of the earth, (2) to perform plasma physics investigations not feasible in ground-based laboratories, and (3) to conduct investigations which are important in understanding planetary and cometary phenomena. The core instrumentation and laboratory configurations for conducting the investigations are defined.

  20. The space shuttle payload planning working groups. Volume 6: Communications and navigation

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The findings of the Communications and Navigation working group of the space shuttle payload planning activity are presented. The basic goals to be accomplished are to increase the use of space systems and to develop new space capabilities for providing communication and navigation services to the user community in the 1980 time period. Specific experiments to be conducted for improving space communication and navigation capabilities are defined. The characteristics of the experimental equipment required to accomplish the mission are discussed.

  1. The production deployment of IPv6 on WLCG

    NASA Astrophysics Data System (ADS)

    Bernier, J.; Campana, S.; Chadwick, K.; Chudoba, J.; Dewhurst, A.; Eliáš, M.; Fayer, S.; Finnern, T.; Grigoras, C.; Hartmann, T.; Hoeft, B.; Idiculla, T.; Kelsey, D. P.; López Muñoz, F.; Macmahon, E.; Martelli, E.; Millar, A. P.; Nandakumar, R.; Ohrenberg, K.; Prelz, F.; Rand, D.; Sciabà, A.; Tigerstedt, U.; Voicu, R.; Walker, C. J.; Wildish, T.

    2015-12-01

    The world is rapidly running out of IPv4 addresses; the number of IPv6 end systems connected to the internet is increasing; WLCG and the LHC experiments may soon have access to worker nodes and/or virtual machines (VMs) possessing only an IPv6 routable address. The HEPiX IPv6 Working Group has been investigating, testing and planning for dual-stack services on WLCG for several years. Following feedback from our working group, many of the storage technologies in use on WLCG have recently been made IPv6-capable. This paper presents the IPv6 requirements, tests and plans of the LHC experiments together with the tests performed on the group's IPv6 test-bed. This is primarily aimed at IPv6-only worker nodes or VMs accessing several different implementations of a global dual-stack federated storage service. Finally the plans for deployment of production dual-stack WLCG services are presented.

  2. Planning and managing future space facility projects. [management by objectives and group dynamics

    NASA Technical Reports Server (NTRS)

    Sieber, J. E.; Wilhelm, J. A.; Tanner, T. A.; Helmreich, R. L.; Burgenbauch, S. F.

    1979-01-01

    To learn how ground-based personnel of a space project plan and organize their work and how such planning and organizing relate to work outcomes, longitudinal study of the management and execution of the Space Lab Mission Development Test 3 (SMD 3) was performed at NASA Ames Research Center. A view of the problems likely to arise in organizations and some methods of coping with these problems are presented as well as the conclusions and recommendations that pertain strictly to SMD 3 management. Emphasis is placed on the broader context of future space facility projects and additional problems that may be anticipated. A model of management that may be used to facilitate problem solving and communication - management by objectives (MBO) is presented. Some problems of communication and emotion management that MBO does not address directly are considered. Models for promoting mature, constructive and satisfying emotional relationships among group members are discussed.

  3. Cache-Aware Asymptotically-Optimal Sampling-Based Motion Planning

    PubMed Central

    Ichnowski, Jeffrey; Prins, Jan F.; Alterovitz, Ron

    2014-01-01

    We present CARRT* (Cache-Aware Rapidly Exploring Random Tree*), an asymptotically optimal sampling-based motion planner that significantly reduces motion planning computation time by effectively utilizing the cache memory hierarchy of modern central processing units (CPUs). CARRT* can account for the CPU’s cache size in a manner that keeps its working dataset in the cache. The motion planner progressively subdivides the robot’s configuration space into smaller regions as the number of configuration samples rises. By focusing configuration exploration in a region for periods of time, nearest neighbor searching is accelerated since the working dataset is small enough to fit in the cache. CARRT* also rewires the motion planning graph in a manner that complements the cache-aware subdivision strategy to more quickly refine the motion planning graph toward optimality. We demonstrate the performance benefit of our cache-aware motion planning approach for scenarios involving a point robot as well as the Rethink Robotics Baxter robot. PMID:25419474

  4. Cache-Aware Asymptotically-Optimal Sampling-Based Motion Planning.

    PubMed

    Ichnowski, Jeffrey; Prins, Jan F; Alterovitz, Ron

    2014-05-01

    We present CARRT* (Cache-Aware Rapidly Exploring Random Tree*), an asymptotically optimal sampling-based motion planner that significantly reduces motion planning computation time by effectively utilizing the cache memory hierarchy of modern central processing units (CPUs). CARRT* can account for the CPU's cache size in a manner that keeps its working dataset in the cache. The motion planner progressively subdivides the robot's configuration space into smaller regions as the number of configuration samples rises. By focusing configuration exploration in a region for periods of time, nearest neighbor searching is accelerated since the working dataset is small enough to fit in the cache. CARRT* also rewires the motion planning graph in a manner that complements the cache-aware subdivision strategy to more quickly refine the motion planning graph toward optimality. We demonstrate the performance benefit of our cache-aware motion planning approach for scenarios involving a point robot as well as the Rethink Robotics Baxter robot.

  5. SU-E-T-632: Preliminary Study On Treating Nose Skin Using Energy and Intensity Modulated Electron Beams with Monte Carlo Based Dose Calculations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jin, L; Eldib, A; Li, J

    Purpose: Uneven nose surfaces and air cavities underneath and the use of bolus present complexity and dose uncertainty when using a single electron energy beam to plan treatments of nose skin with a pencil beam-based planning system. This work demonstrates more accurate dose calculation and more optimal planning using energy and intensity modulated electron radiotherapy (MERT) delivered with a pMLC. Methods: An in-house developed Monte Carlo (MC)-based dose calculation/optimization planning system was employed for treatment planning. Phase space data (6, 9, 12 and 15 MeV) were used as an input source for MC dose calculations for the linac. To reducemore » the scatter-caused penumbra, a short SSD (61 cm) was used. Our previous work demonstrates good agreement in percentage depth dose and off-axis dose between calculations and film measurement for various field sizes. A MERT plan was generated for treating the nose skin using a patient geometry and a dose volume histogram (DVH) was obtained. The work also shows the comparison of 2D dose distributions between a clinically used conventional single electron energy plan and the MERT plan. Results: The MERT plan resulted in improved target dose coverage as compared to the conventional plan, which demonstrated a target dose deficit at the field edge. The conventional plan showed higher dose normal tissue irradiation underneath the nose skin while the MERT plan resulted in improved conformity and thus reduces normal tissue dose. Conclusion: This preliminary work illustrates that MC-based MERT planning is a promising technique in treating nose skin, not only providing more accurate dose calculation, but also offering an improved target dose coverage and conformity. In addition, this technique may eliminate the necessity of bolus, which often produces dose delivery uncertainty due to the air gaps that may exist between the bolus and skin.« less

  6. The space shuttle payload planning working groups. Volume 8: Earth and ocean physics

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The findings and recommendations of the Earth and Ocean Physics working group of the space shuttle payload planning activity are presented. The requirements for the space shuttle mission are defined as: (1) precision measurement for earth and ocean physics experiments, (2) development and demonstration of new and improved sensors and analytical techniques, (3) acquisition of surface truth data for evaluation of new measurement techniques, (4) conduct of critical experiments to validate geophysical phenomena and instrumental results, and (5) development and validation of analytical/experimental models for global ocean dynamics and solid earth dynamics/earthquake prediction. Tables of data are presented to show the flight schedule estimated costs, and the mission model.

  7. 2010 Chemical Working Group Status

    NASA Technical Reports Server (NTRS)

    Reid, Concha M.

    2010-01-01

    The Steering Group for the Interagency Advanced Power Group (IAPG) held their business meeting on November 30-December 1st in McLean, Virginia. Status reports were presented from each of the IAPG's Working Groups. These charts contain a brief summary of the IAPG Chemical Working Group's activities during 2010 and its plans for 2011.

  8. 75 FR 56562 - Proposed Information Collection Request Submitted for Public Comment and Recommendations...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-16

    ... safe and healthful working environment. A well planned mine ventilation system is necessary to assure a fresh air supply to miners at all working places, to control the amounts of harmful airborne... present harsh and hostile working environments. The ventilation system is the most vital life support...

  9. National Forest System working circles: a question of size and ownership composition

    Treesearch

    Robert J. Hrubes

    1976-01-01

    Allowable-cut (potential yield) levels on National Forest land are determined for planning units called working circles. The size of working circles has been increased over the past 30 years to the present scale which is often coincident with National Forest boundaries. Larger working circles have recently been considered because of the anticipated impacts on timber...

  10. MRI-based dynamic tracking of an untethered ferromagnetic microcapsule navigating in liquid

    NASA Astrophysics Data System (ADS)

    Dahmen, Christian; Belharet, Karim; Folio, David; Ferreira, Antoine; Fatikow, Sergej

    2016-04-01

    The propulsion of ferromagnetic objects by means of MRI gradients is a promising approach to enable new forms of therapy. In this work, necessary techniques are presented to make this approach work. This includes path planning algorithms working on MRI data, ferromagnetic artifact imaging and a tracking algorithm which delivers position feedback for the ferromagnetic objects, and a propulsion sequence to enable interleaved magnetic propulsion and imaging. Using a dedicated software environment, integrating path-planning methods and real-time tracking, a clinical MRI system is adapted to provide this new functionality for controlled interventional targeted therapeutic applications. Through MRI-based sensing analysis, this article aims to propose a framework to plan a robust pathway to enhance the navigation ability to reach deep locations in the human body. The proposed approaches are validated with different experiments.

  11. An Interval Type-2 Fuzzy Multiple Echelon Supply Chain Model

    NASA Astrophysics Data System (ADS)

    Miller, Simon; John, Robert

    Planning resources for a supply chain is a major factor determining its success or failure. In this paper we build on previous work introducing an Interval Type-2 Fuzzy Logic model of a multiple echelon supply chain. It is believed that the additional degree of uncertainty provided by Interval Type-2 Fuzzy Logic will allow for better representation of the uncertainty and vagueness present in resource planning models. First, the subject of Supply Chain Management is introduced, then some background is given on related work using Type-1 Fuzzy Logic. A description of the Interval Type-2 Fuzzy model is given, and a test scenario detailed. A Genetic Algorithm uses the model to search for a near-optimal plan for the scenario. A discussion of the results follows, along with conclusions and details of intended further work.

  12. A Model Curriculum and Program for Preretirement Planning Courses. NCCSCE Working Paper Series.

    ERIC Educational Resources Information Center

    Wilson, Gary W.; Oerke, George W.

    Intended to assist continuing education professionals in the planning and implementation of local preretirement training programs, this paper provides information on Edison State Community College's program, developed for use by industrial, commercial, and public agency employees and the general public. First, an overview is presented of the…

  13. Outcome-Based School-to-Work Transition Planning for Students with Severe Disabilities.

    ERIC Educational Resources Information Center

    Steere, Daniel E.; And Others

    1990-01-01

    A transition planning process that focuses on quality-of-life outcomes is presented. The process, which views employment not as an outcome but as a vehicle for the attainment of quality of life, involves six steps: orientation, personal profile development, identification of employment outcomes, measurement system, compatibility process, and…

  14. Working the Planning Table: Negotiating Democratically for Adult, Continuing, and Workplace Education

    ERIC Educational Resources Information Center

    Cervero, Ronald M.; Wilson, Arthur L.

    2005-01-01

    In this book, Ronald M. Cervero and Arthur L. Wilson offer a theory that accounts for planners' lived experience and provides a guide for developing effective educational programs for adults. The book presents three planning case studies that illustrate how power, interests, ethical commitment, and negotiation are central to planners' everyday…

  15. Image formation simulation for computer-aided inspection planning of machine vision systems

    NASA Astrophysics Data System (ADS)

    Irgenfried, Stephan; Bergmann, Stephan; Mohammadikaji, Mahsa; Beyerer, Jürgen; Dachsbacher, Carsten; Wörn, Heinz

    2017-06-01

    In this work, a simulation toolset for Computer Aided Inspection Planning (CAIP) of systems for automated optical inspection (AOI) is presented along with a versatile two-robot-setup for verification of simulation and system planning results. The toolset helps to narrow down the large design space of optical inspection systems in interaction with a system expert. The image formation taking place in optical inspection systems is simulated using GPU-based real time graphics and high quality off-line-rendering. The simulation pipeline allows a stepwise optimization of the system, from fast evaluation of surface patch visibility based on real time graphics up to evaluation of image processing results based on off-line global illumination calculation. A focus of this work is on the dependency of simulation quality on measuring, modeling and parameterizing the optical surface properties of the object to be inspected. The applicability to real world problems is demonstrated by taking the example of planning a 3D laser scanner application. Qualitative and quantitative comparison results of synthetic and real images are presented.

  16. SOCAP: Lessons learned in applying SIPE-2 to the military operations crisis action planning domain

    NASA Technical Reports Server (NTRS)

    Desimone, Roberto

    1992-01-01

    This report describes work funded under the DARPA Planning and Scheduling Initiative that led to the development of SOCAP (System for Operations Crisis Action Planning). In particular, it describes lessons learned in applying SIPE-2, the underlying AI planning technology within SOCAP, to the domain of military operations deliberate and crisis action planning. SOCAP was demonstrated at the U.S. Central Command and at the Pentagon in early 1992. A more detailed report about the lessons learned is currently being prepared. This report was presented during one of the panel discussions on 'The Relevance of Scheduling to AI Planning Systems.'

  17. Plan for the design, development, and implementation, and operation of the National Water Information System

    USGS Publications Warehouse

    Edwards, M.D.

    1987-01-01

    The Water Resources Division of the U.S. Geological Survey is developing a National Water Information System (NWIS) that will integrate and replace its existing water data and information systems of the National Water Data Storage and Retrieval System, National Water Data Exchange, National Water-Use Information, and Water Resources Scientific Information Center programs. It will be a distributed data system operated as part of the Division 's Distributed Information System, which is a network of computers linked together through a national telecommunication network known as GEONET. The NWIS is being developed as a series of prototypes that will be integrated as they are completed to allow the development and implementation of the system in a phased manner. It also is being developed in a distributed manner using personnel who work under the coordination of a central NWIS Project Office. Work on the development of the NWIS began in 1983 and it is scheduled for completion in 1990. This document presents an overall plan for the design, development, implementation, and operation of the system. Detailed discussions are presented on each of these phases of the NWIS life cycle. The planning, quality assurance, and configuration management phases of the life cycle also are discussed. The plan is intended to be a working document for use by NWIS management and participants in its design and development and to assist offices of the Division in planning and preparing for installation and operation of the system. (Author 's abstract)

  18. Publication planning 101.

    PubMed

    Sismondo, Sergio; Nicholson, Scott Howard

    2009-01-01

    Publication planning is the sub-industry to the pharmaceutical industry that does the organizational and practical work of shaping pharmaceutical companies' data and turning it into medical journal articles. Its main purpose is to create and communicate scientific information to support the marketing of products. This report is based mostly on information presented at the 2007 annual meeting of the International Society of Medical Planning Professionals, including a workshop entitled "Publication Planning 101/201", attended by one of us. We provide some analysis of the role of publication planning in medical publishing, and its implications for the structuring of medical knowledge.

  19. The space shuttle payload planning working groups. Volume 4: Life sciences

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The findings of the Life Sciences working group of the space shuttle payload planning activity are presented. The objectives of the Life Sciences investigations are: (1) to continue the research directed at understanding the origin of life and the search for extraterrestrial evidence of life, (2) biomedical research to understand mechanisms and provide criteria for support of manned flight, (3) technology development for life support, protective systems, and work aids for providing environmental control, and (4) to study basic biological functions at all levels or organization influenced by gravity, radiation, and circadian rhythms. Examples of candidate experimental schedules and the experimental package functional requirements are included.

  20. Loads and Aeroelasticity Division research and technology accomplishments for FY 1984 and plans for FY 1985

    NASA Technical Reports Server (NTRS)

    Gardner, J. E.; Dixon, S. C.

    1985-01-01

    The loads and aeroelasticity divisions research accomplishments are presented. The work under each branch or technical area, described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to 5 year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  1. The 25 kW power module evolution study. Part 3: Conceptual designs for power module evolution. Volume 2: Program plans

    NASA Technical Reports Server (NTRS)

    1979-01-01

    A plan is presented for the evolutionary development and deployment of the power module system with performance capabilities required to support the 1983 to 1990 user requirements. Aspects summarized include program functional, operational, and hardware elements; program work breakdown and specification items; development plans and schedules for developmental and technology milestones; test concepts and timeliness; and ground and orbit operations concepts.

  2. Coordinating sensing and local navigation

    NASA Technical Reports Server (NTRS)

    Slack, Marc G.

    1991-01-01

    Based on Navigation Templates (or NaTs), this work presents a new paradigm for local navigation which addresses the noisy and uncertain nature of sensor data. Rather than creating a new navigation plan each time the robot's perception of the world changes, the technique incorporates perceptual changes directly into the existing navigation plan. In this way, the robot's navigation plan is quickly and continuously modified, resulting in actions that remain coordinated with its changing perception of the world.

  3. Contingency plan implementation.

    PubMed

    Neurath, D; Cober, N; Owens, W; Giulivi, A

    2012-06-01

    Although the National blood system in Canada reduces the risk of inventory shortages the possibility of a blood supply shortage still exists. The Ontario Ministry of Health and Long-Term Care developed a provincial plan to manage blood transfusion needs and inventory in the event of a National blood shortage. The Ontario plan was developed to align with the National plan as well as other provincial plans in order to ensure consistency in blood management strategies across the country. The Ontario plan was released in 2008, along with a toolkit to aid hospitals in developing their facility specific plans. In the Champlain region of Ontario, a group of 16 hospitals worked collaboratively to develop a regional blood shortage plan. A provincial blood shortage simulation exercise was held in 2010 to test out these plans. The Director of Transfusion Medicine of the largest facility in the group of 16 hospitals (The Ottawa Hospital) took the lead in the development of the regional blood shortage management plan. Working groups from all 16 sites contributed to the plan development. The proposed plan was presented to the Medical Advisory Committee for approval. The plan consists of activities relating to the severity of the supply shortage as defined by Amber, Red, Recovery and Green phases. The plan includes a communication plan for notifying stakeholders including patients whose treatment may be affected. Inventory management and triage guidelines are provided to reduce the demand for blood and to conserve inventory for those patients whose need is prioritized as highest. The regional blood shortage management plan was tested successfully during the provincial simulation exercise. Where regional hospitals work together to provide healthcare, it is beneficial to develop a standardized plan to provide guidance to hospital personnel in response to a blood supply shortage. A consistent plan will ensure patient care is provided in a consistent manner across a health region. Mock or simulation exercises can aid in testing plans and raising the awareness of stakeholders. Copyright © 2012 Elsevier Ltd. All rights reserved.

  4. Dose planning management of patients undergoing salvage whole brain radiation therapy after radiosurgery

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Saw, Cheng B., E-mail: cheng.saw@aol.com; Battin, Frank; McKeague, Janice

    2016-01-01

    Dose or treatment planning management is necessary for the re-irradiation of intracranial relapses after focal irradiation, radiosurgery, or stereotactic radiotherapy. The current clinical guidelines for metastatic brain tumors are the use of focal irradiation if the patient presents with 4 lesions or less. Salvage treatments with the use of whole brain radiation therapy (WBRT) can then be used to limit disease progression if there is an intracranial relapse. However, salvage WBRT poses a number of challenges in dose planning to limit disease progression and preserve neurocognitive function. This work presents the dose planning management that addresses a method of delineatingmore » previously treated volumes, dose level matching, and the dose delivery techniques for WBRT.« less

  5. Selenide isotope generator for the Galileo mission. Reliability program plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1978-10-01

    The reliability program plan for the Selenide Isotope Generator (SIG) program is presented. It delineates the specific tasks that will be accomplished by Teledyne Energy Systems and its suppliers during design, development, fabrication and test of deliverable Radioisotopic Thermoelectric Generators (RTG), Electrical Heated Thermoelectric Generators (ETG) and associated Ground Support Equipment (GSE). The Plan is formulated in general accordance with procedures specified in DOE Reliability Engineering Program Requirements Publication No. SNS-2, dated June 17, 1974. The Reliability Program Plan presented herein defines the total reliability effort without further reference to Government Specifications. The reliability tasks to be accomplished are delineatedmore » herein and become the basis for contract compliance to the extent specified in the SIG contract Statement of Work.« less

  6. Social Factors in the Health of Families: A Public Health Social Work Responsibility. Proceedings of a Conference (Pittsburgh, Pennsylvania, March 23-26, 1986).

    ERIC Educational Resources Information Center

    St. Denis, Gerald C., Ed.

    This document contains a list of planning committee members, institute participants, an introduction by Gerald C. St. Denis a program agenda, and institute presentations from this conference. The following presentations are included: (1) "Social Factors in the Health of Families: A Public Health Social Work Responsibility" (Stanley F. Battle); (2)…

  7. Gender and Choice in Education and Occupation.

    ERIC Educational Resources Information Center

    Radford, John, Ed.

    Nine chapters present cutting-edge research on "brainsex" and its effects on personality, education, and choice. It targets concepts such as job attributes, work flexibility, long-term life planning, home-work conflict, prestige versus occupational interest, and intrinsic motivational mechanisms to explain the relative failure of…

  8. Analysis of Trinity Power Metrics for Automated Monitoring

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Michalenko, Ashley Christine

    This is a presentation from Los Alamos National Laboraotyr (LANL) about the analysis of trinity power metrics for automated monitoring. The following topics are covered: current monitoring efforts, motivation for analysis, tools used, the methodology, work performed during the summer, and future work planned.

  9. Structural dynamics division research and technology accomplishments for FY 1992 and plans for FY 1993

    NASA Technical Reports Server (NTRS)

    Wynne, Eleanor C.

    1993-01-01

    The purpose of this paper is to present the Structural Dynamics Division's research accomplishments for F.Y. 1992 and research plans for F.Y. 1993. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to 5-year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  10. Loads and aeroelasticity division research and technology accomplishments for FY 1987 and plans for FY 1988

    NASA Technical Reports Server (NTRS)

    Dixon, S. C.; Gardner, James E.

    1988-01-01

    The purpose of this paper is to present the Loads and Aeroelasticity Division's research accomplishments for FY87 and research plans for FY88. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  11. Energy plan, 1981

    NASA Astrophysics Data System (ADS)

    1981-12-01

    The planning procedures for the energy program and policy guidelines for energy planning are presented. Future changes in marginal costs and directions indicated for economically efficient pricing are assessed. The aim of the conservation program is to close the gap between the amounts of conservation which is rationally cost effective and that projected to occur anyway through normal market forces. An overview of energy demand and proposed plans for energy supply are given. Liquid fuels have priority although work on coal receives new emphasis. A better program on energy demand and management is suggested.

  12. KSC Press Site Transformer Bldg. (K7-1205c) SWMU 074 Interim Measure Work Plan

    NASA Technical Reports Server (NTRS)

    Starr, A. Scott; Applegate, Joe

    2014-01-01

    This document presents and discusses the Interim Measure (IM) Work Plan for the Press Site Transformer Building (K7-1205C). The purpose of the proposed IM activities is to remove soil affected with polychlorinated biphenyls (PCBs) greater than the Florida Department of Environmental Protection (FDEP) residential direct-exposure Soil Cleanup Target Level (R-SCTL) of 0.5 milligrams per kilogram and encapsulate concrete exhibiting PCB concentration greater than the Toxic Substance Control Act (TSCA) threshold of 50 milligrams per kilogram.

  13. [The algorithm for planning cosmonauts' timeline in flight (by the results of long-duration Mir mission)].

    PubMed

    Nechaev, A P

    2001-01-01

    Results of the investigation of the interrelation between cosmonauts' erroneous actions and work and rest schedule intensity in fourteen long-duration Mir missions are presented in the paper. The statistical significance of this dependence has been established, and its nonlinear character has been revealed. An algorithm of short-range planning of crew operations has been developed based on determination of critical crew work loads deduced from increases in erroneous actions. Together with other methods the suggested approach may be used to raise cosmonauts' performance reliability.

  14. Tally and geometry definition influence on the computing time in radiotherapy treatment planning with MCNP Monte Carlo code.

    PubMed

    Juste, B; Miro, R; Gallardo, S; Santos, A; Verdu, G

    2006-01-01

    The present work has simulated the photon and electron transport in a Theratron 780 (MDS Nordion) (60)Co radiotherapy unit, using the Monte Carlo transport code, MCNP (Monte Carlo N-Particle), version 5. In order to become computationally more efficient in view of taking part in the practical field of radiotherapy treatment planning, this work is focused mainly on the analysis of dose results and on the required computing time of different tallies applied in the model to speed up calculations.

  15. High speed precision motion strategies for lightweight structures

    NASA Technical Reports Server (NTRS)

    Book, Wayne J.

    1987-01-01

    Work during the recording period proceeded along the lines of the proposal, i.e., three aspects of high speed motion planning and control of flexible structures were explored: fine motion control, gross motion planning and control, and automation using light weight arms. In addition, modeling the large manipulator arm to be used in experiments and theory has lead to some contributions in that area. These aspects are reported below. Conference, workshop and journal submissions, and presentations related to this work were seven in number, and are listed. Copies of written papers and abstracts are included.

  16. Florida Atlantic University Work Plan Presentation for 2012-13 Board of Governors Review

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2012

    2012-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  17. University of North Florida Work Plan Presentation for 2012-13 Board of Governors Review

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2012

    2012-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  18. Florida State University Work Plan Presentation for 2013-14 Board of Governors Review

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2013

    2013-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  19. Florida International University Work Plan Presentation for 2014-15 Board of Governors Review

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  20. University of Central Florida Work Plan Presentation for 2012-13 Board of Governors Review

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2012

    2012-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  1. Florida Gulf Coast University Work Plan Presentation for 2014-15 Board of Governors Review

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  2. USF Sarasota-Manatee Work Plan Presentation for 2014-15 Board of Governors Review

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  3. Florida Polytechnic University Work Plan Presentation for 2014-15 Board of Governors Review

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  4. University of North Florida Work Plan Presentation for 2014-15 Board of Governors Review

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  5. Florida International University Work Plan Presentation for 2012-13 Board of Governors Review

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2012

    2012-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  6. University of North Florida Work Plan Presentation for 2013-14 Board of Governors Review

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2013

    2013-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  7. Florida Gulf Coast University Work Plan Presentation for 2012-13 Board of Governors Review

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2012

    2012-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  8. Florida Polytechnic University Work Plan Presentation for 2013-14 Board of Governors Review

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2013

    2013-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  9. University of West Florida Work Plan Presentation for 2012-13 Board of Governors Review

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2012

    2012-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  10. Florida A&M University Work Plan Presentation for 2014-15 Board of Governors Review

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  11. Florida Gulf Coast University Work Plan Presentation for 2013-14 Board of Governors Review

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2013

    2013-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  12. Florida Atlantic University Work Plan Presentation for 2013-14 Board of Governors Review

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2013

    2013-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  13. Florida A&M University Work Plan Presentation for 2013-14 Board of Governors Review

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  14. Florida Atlantic University Work Plan Presentation for 2014-15 Board of Governors Review

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  15. Florida State University Work Plan Presentation for 2014-15 Board of Governors Review

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  16. University of Florida Work Plan Presentation for 2014-15 Board of Governors Review

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  17. Florida International University Work Plan Presentation for 2013-14 Board of Governors Review

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2013

    2013-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  18. University of Central Florida Work Plan Presentation for 2014-15 Board of Governors Review

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  19. New College of Florida Work Plan Presentation for 2014-15 Board of Governors Review

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  20. University of Florida Work Plan Presentation for 2013-14 Board of Governors Review

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2013

    2013-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  1. New College of Florida Work Plan Presentation for 2013-14 Board of Governors Review

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2013

    2013-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  2. Florida State University Work Plan Presentation for 2012-13 Board of Governors Review

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2012

    2012-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  3. New College of Florida Work Plan Presentation for 2012-13 Board of Governors Review

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2012

    2012-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  4. University of Florida Work Plan Presentation for 2012-13 Board of Governors Review

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2012

    2012-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  5. University of Central Florida Work Plan Presentation for 2013-14 Board of Governors Review

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2013

    2013-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  6. University of West Florida Work Plan Presentation for 2014-15 Board of Governors Review

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  7. Resilience Planning Approaches “Ready-to-Use”: Lessons from EPA Partnerships. How to work with a community to design a nature-based hazard mitigation project

    EPA Science Inventory

    A fast-paced delivery of approaches developed in EPA partnerships to enable effective inclusion of environmental and social resilience into hazard mitigation planning. This presentation will cover a broad spectrum, from 1) EPA’s role in mitigation, 2) what a Regional Resil...

  8. Implementation plan for HANDI 2000 TWRS master equipment list

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BENNION, S.I.

    This document presents the implementation plan for an additional deliverable of the HANDI 2000 Project. The PassPort Equipment Data module processes include those portions of the COTS PassPort system required to support tracking and management of the Master Equipment List for Lockheed Martin Hanford Company (LMHC) and custom software created to work with the COTS products.

  9. Development of a Conference Planning Model Using Integrated Database, Word Processing, and Spreadsheet Software.

    ERIC Educational Resources Information Center

    Stevens, William E.

    This report presents a model for conducting a statewide conference for the approximately 900 members of the South Carolina Council of Teachers of Mathematics (SCCTM) using the AppleWorks integrated software as the basis of the implementation plan. The first and second chapters provide background information on the conference and the…

  10. Keiko, Killer Whale. [Lesson Plan].

    ERIC Educational Resources Information Center

    Discovery Communications, Inc., Bethesda, MD.

    This lesson plan presents activities designed to help students understand that Keiko, the killer whale, lived for a long time in an aquarium and had to be taught to live independently; and that computer users can get updates on how Keiko is doing. The main activity of the lesson involves middle school students working in small groups to produce a…

  11. VERS: a virtual environment for reconstructive surgery planning

    NASA Astrophysics Data System (ADS)

    Montgomery, Kevin N.

    1997-05-01

    The virtual environment for reconstructive surgery (VERS) project at the NASA Ames Biocomputation Center is applying virtual reality technology to aid surgeons in planning surgeries. We are working with a craniofacial surgeon at Stanford to assemble and visualize the bone structure of patients requiring reconstructive surgery either through developmental abnormalities or trauma. This project is an extension of our previous work in 3D reconstruction, mesh generation, and immersive visualization. The current VR system, consisting of an SGI Onyx RE2, FakeSpace BOOM and ImmersiveWorkbench, Virtual Technologies CyberGlove and Ascension Technologies tracker, is currently in development and has already been used to visualize defects preoperatively. In the near future it will be used to more fully plan the surgery and compute the projected result to soft tissue structure. This paper presents the work in progress and details the production of a high-performance, collaborative, and networked virtual environment.

  12. A collaborative interaction and visualization multi-modal environment for surgical planning.

    PubMed

    Foo, Jung Leng; Martinez-Escobar, Marisol; Peloquin, Catherine; Lobe, Thom; Winer, Eliot

    2009-01-01

    The proliferation of virtual reality visualization and interaction technologies has changed the way medical image data is analyzed and processed. This paper presents a multi-modal environment that combines a virtual reality application with a desktop application for collaborative surgical planning. Both visualization applications can function independently but can also be synced over a network connection for collaborative work. Any changes to either application is immediately synced and updated to the other. This is an efficient collaboration tool that allows multiple teams of doctors with only an internet connection to visualize and interact with the same patient data simultaneously. With this multi-modal environment framework, one team working in the VR environment and another team from a remote location working on a desktop machine can both collaborate in the examination and discussion for procedures such as diagnosis, surgical planning, teaching and tele-mentoring.

  13. Field Implementation Plan for the In-Situ Bioremediation Treatability Study at the Technical Area-V Groundwater Area of Concern

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Li, Jun

    This Field Implementation Plan (FIP) was prepared by Sandia National Laboratories, New Mexico (SNL/NM) and provides instruction on conducting a series of in-situ bioremediation (ISB) tests as described in the Revised Treatability Study Work Plan for In-Situ Bioremediation at the Technical Area-V Groundwater Area of Concern, referred to as the Revised Work Plan in this FIP. The Treatability Study is designed to gravity inject an electron-donor substrate and bioaugmentation bacteria into groundwater via three injection wells to perform bioremediation of the constituents of concern (COCs), nitrate and trichloroethene (TCE), in the regions with the highest concentrations at the Technical Area-Vmore » Groundwater (TAVG) Area of Concern (AOC). The Treatability Study will evaluate the effectiveness of bioremediation solution delivery and COC treatment over time. This FIP is designed for SNL/NM work planning and management. It is not intended to be submitted for regulator’s approval. The technical details presented in this FIP are subject to change based on field conditions, availability of equipment and materials, feasibility, and inputs from Sandia personnel and Aboveground Injection System contractor.« less

  14. 40 CFR 35.107 - Work plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Work plans. 35.107 Section 35.107... ASSISTANCE Environmental Program Grants Preparing An Application § 35.107 Work plans. (a) Bases for negotiating work plans. The work plan is negotiated between the applicant and the Regional Administrator and...

  15. 77 FR 29317 - Fiscal Year 2011 Draft Work Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-17

    ... DENALI COMMISSION Fiscal Year 2011 Draft Work Plan AGENCY: Denali Commission. ACTION: Notice... develop proposed work plans for future spending and that the annual Work Plan be published in the Federal... Work Plan for Federal Fiscal Year 2011. DATES: Comments and related material to be received by June 10...

  16. 40 CFR 35.507 - Work plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Work plans. 35.507 Section 35.507... ASSISTANCE Environmental Program Grants for Tribes Preparing An Application § 35.507 Work plans. (a) Bases for negotiating work plans. The work plan is negotiated between the applicant and the Regional...

  17. 40 CFR 35.507 - Work plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Work plans. 35.507 Section 35.507... ASSISTANCE Environmental Program Grants for Tribes Preparing An Application § 35.507 Work plans. (a) Bases for negotiating work plans. The work plan is negotiated between the applicant and the Regional...

  18. 40 CFR 35.107 - Work plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Work plans. 35.107 Section 35.107... ASSISTANCE Environmental Program Grants Preparing An Application § 35.107 Work plans. (a) Bases for negotiating work plans. The work plan is negotiated between the applicant and the Regional Administrator and...

  19. AeroPropulsoServoElasticity: Dynamic Modeling of the Variable Cycle Propulsion System

    NASA Technical Reports Server (NTRS)

    Kopasakis, George

    2012-01-01

    This presentation was made at the 2012 Fundamental Aeronautics Program Technical Conference and it covers research work for the Dynamic Modeling of the Variable cycle Propulsion System that was done under the Supersonics Project, in the area of AeroPropulsoServoElasticity. The presentation covers the objective for the propulsion system dynamic modeling work, followed by the work that has been done so far to model the variable Cycle Engine, modeling of the inlet, the nozzle, the modeling that has been done to model the affects of flow distortion, and finally presenting some concluding remarks and future plans.

  20. Optimization process planning using hybrid genetic algorithm and intelligent search for job shop machining.

    PubMed

    Salehi, Mojtaba; Bahreininejad, Ardeshir

    2011-08-01

    Optimization of process planning is considered as the key technology for computer-aided process planning which is a rather complex and difficult procedure. A good process plan of a part is built up based on two elements: (1) the optimized sequence of the operations of the part; and (2) the optimized selection of the machine, cutting tool and Tool Access Direction (TAD) for each operation. In the present work, the process planning is divided into preliminary planning, and secondary/detailed planning. In the preliminary stage, based on the analysis of order and clustering constraints as a compulsive constraint aggregation in operation sequencing and using an intelligent searching strategy, the feasible sequences are generated. Then, in the detailed planning stage, using the genetic algorithm which prunes the initial feasible sequences, the optimized operation sequence and the optimized selection of the machine, cutting tool and TAD for each operation based on optimization constraints as an additive constraint aggregation are obtained. The main contribution of this work is the optimization of sequence of the operations of the part, and optimization of machine selection, cutting tool and TAD for each operation using the intelligent search and genetic algorithm simultaneously.

  1. Optimization process planning using hybrid genetic algorithm and intelligent search for job shop machining

    PubMed Central

    Salehi, Mojtaba

    2010-01-01

    Optimization of process planning is considered as the key technology for computer-aided process planning which is a rather complex and difficult procedure. A good process plan of a part is built up based on two elements: (1) the optimized sequence of the operations of the part; and (2) the optimized selection of the machine, cutting tool and Tool Access Direction (TAD) for each operation. In the present work, the process planning is divided into preliminary planning, and secondary/detailed planning. In the preliminary stage, based on the analysis of order and clustering constraints as a compulsive constraint aggregation in operation sequencing and using an intelligent searching strategy, the feasible sequences are generated. Then, in the detailed planning stage, using the genetic algorithm which prunes the initial feasible sequences, the optimized operation sequence and the optimized selection of the machine, cutting tool and TAD for each operation based on optimization constraints as an additive constraint aggregation are obtained. The main contribution of this work is the optimization of sequence of the operations of the part, and optimization of machine selection, cutting tool and TAD for each operation using the intelligent search and genetic algorithm simultaneously. PMID:21845020

  2. The space shuttle payload planning working groups. Volume 10: Space technology

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The findings and recommendations of the Space Technology group of the space shuttle payload planning activity are presented. The elements of the space technology program are: (1) long duration exposure facility, (2) advanced technology laboratory, (3) physics and chemistry laboratory, (4) contamination experiments, and (5) laser information/data transmission technology. The space technology mission model is presented in tabular form. The proposed experiments to be conducted by each test facility are described. Recommended approaches for user community interfacing are included.

  3. Design, fabrication, test, qualification and price analysis for third generation design solar cell modules

    NASA Technical Reports Server (NTRS)

    1980-01-01

    An updated program plan is presented showing the task descriptions depicting the work, progress, achievements, and the cause of any deviations from the original plan (SC-1), and how this impacted on the original schedule of the program. In addition there is an update documenting all design alterations made during the pre-production phase and a complete up to date set of engineering and manufacturing documentation (CM-1). The purpose of the work in the original plan was to explore, design, develop, test, and deliver 1000 watts of prototype flat plate, photovoltaic modules appropriate for use in applications in the 20 to 500 kilowatt range and which show potential for meeting the 1986 cost goals.

  4. Using Remote Sensing Data and Research Results for Urban Heat Island Mitigation

    NASA Technical Reports Server (NTRS)

    Estes, Maury; Luvall, Jeffrey

    1999-01-01

    This paper provides information on the characteristics of the urban heat island, research designed to provide the data needed to develop effective urban heat island reduction strategies, and the development of local working groups to develop implementation plans. As background, an overview of research results on the urban heat island phenomenon and the resultant effect on energy usage and air quality will be explored. The use of more reflective roofing materials, paving materials, tree planting, and other initiatives will be explored as a basis for strategies to mitigate urban heat islands and improve the urban environment. Current efforts to use aircraft remote sensing data in Atlanta, Baton Rouge, Sacramento, and Salt Lake City and our work with non-profit organizations designated to lead public education and strategic development efforts will be presented. Efforts to organize working groups comprised of key stakeholders, the process followed in communicating research results, and methodology for soliciting feedback and incorporating ideas into local plans, policies and decision-making will be discussed. Challenges in developing and transferring data products and research results to stakeholders will be presented. It is our ultimate goal that such efforts be integrated into plans and/or decision models that encourage sustainable development.

  5. Information Presentation

    NASA Technical Reports Server (NTRS)

    Holden, Kritina L.; Thompson, Shelby G.; Sandor, Aniko; McCann, Robert S.; Kaiser, Mary K.; Adelstein, Barnard D.; Begault, Durand R.; Beutter, Brent R.; Stone, Leland S.; Godfroy, Martine

    2009-01-01

    The goal of the Information Presentation Directed Research Project (DRP) is to address design questions related to the presentation of information to the crew. In addition to addressing display design issues associated with information formatting, style, layout, and interaction, the Information Presentation DRP is also working toward understanding the effects of extreme environments encountered in space travel on information processing. Work is also in progress to refine human factors-based design tools, such as human performance modeling, that will supplement traditional design techniques and help ensure that optimal information design is accomplished in the most cost-efficient manner. The major areas of work, or subtasks, within the Information Presentation DRP for FY10 are: 1) Displays, 2) Controls, 3) Procedures and Fault Management, and 4) Human Performance Modeling. The poster will highlight completed and planned work for each subtask.

  6. "But I wasn't told to": lack of education and workplace policy as barriers in the provision of family planning information.

    PubMed

    Bell, Melissa M

    2015-01-01

    Access to family planning has been identified as critical to public health. Improving the linkage between medical and social services could result in improved access to care for those most at risk of unintended pregnancy. This study used a survey based on Alfred Bandura's social cognitive theory (1986) to increase the understanding of the barriers social workers confront in the provision of family planning information to clients. Although moral disagreement with family planning presented a barrier for some, workplace policy, participation in family planning trainings, and working in an urban setting were of greater value in understanding barriers.

  7. 7 CFR 23.13 - Plan of Work.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 1 2011-01-01 2011-01-01 false Plan of Work. 23.13 Section 23.13 Agriculture Office of the Secretary of Agriculture STATE AND REGIONAL ANNUAL PLANS OF WORK Regional Program § 23.13 Plan of Work. (a) A Regional Plan of Work for carrying out the programs authorized to be funded under...

  8. Automated geospatial Web Services composition based on geodata quality requirements

    NASA Astrophysics Data System (ADS)

    Cruz, Sérgio A. B.; Monteiro, Antonio M. V.; Santos, Rafael

    2012-10-01

    Service-Oriented Architecture and Web Services technologies improve the performance of activities involved in geospatial analysis with a distributed computing architecture. However, the design of the geospatial analysis process on this platform, by combining component Web Services, presents some open issues. The automated construction of these compositions represents an important research topic. Some approaches to solving this problem are based on AI planning methods coupled with semantic service descriptions. This work presents a new approach using AI planning methods to improve the robustness of the produced geospatial Web Services composition. For this purpose, we use semantic descriptions of geospatial data quality requirements in a rule-based form. These rules allow the semantic annotation of geospatial data and, coupled with the conditional planning method, this approach represents more precisely the situations of nonconformities with geodata quality that may occur during the execution of the Web Service composition. The service compositions produced by this method are more robust, thus improving process reliability when working with a composition of chained geospatial Web Services.

  9. Differential verbal, visual, and spatial working memory in written language production.

    PubMed

    Raulerson, Bascom A; Donovan, Michael J; Whiteford, Alison P; Kellogg, Ronald T

    2010-02-01

    The contributions of verbal, visual, and spatial working memory to written language production were investigated. Participants composed definitions for nouns while concurrently performing a task which required updating, storing, and retrieving information coded either verbally, visually, or spatially. The present study extended past findings by showing the linguistic encoding of planned conceptual content makes its largest demand on verbal working memory for both low and high frequency nouns. Kellogg, Olive, and Piolat in 2007 found that concrete nouns place substantial demands on visual working memory when imaging the nouns' referents during planning, whereas abstract nouns make no demand. The current study further showed that this pattern was not an artifact of visual working memory being sensitive to manipulation of just any lexical property of the noun prompts. In contrast to past results, writing made a small but detectible demand on spatial working memory.

  10. Using multi-disciplinary strategic master facilities planning for organizations experiencing programmatic re-direction

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Heubach, J.G.; Weimer, W.C.; Bruce, W.A.

    Facility master planning is critical to the future productivity of a laboratory and the quality of worklife for the laboratory staff. For organizations undergoing programmatic re-direction, a master facility planning approach linked to the organization`s strategic planning process is even more important. Major changes in an organization such as programmatic re-direction can significantly impact a broad range of variables which exceed the expertise of traditional planning teams, e.g., capacity variability, work team organization, organizational culture, and work process simplification. By expanding the diversity of the participants of the planning team, there is a greater likelihood that a research organization`s scientific,more » organizational, economic, and employees` needs can be meshed in the strategic plan and facility plan. Recent recommendations from facility planners suggest drawing from diverse fields in building multi-disciplinary planning teams: Architecture, engineering, natural science, social psychology, and strategic planning (Gibson,1993). For organizations undergoing significant operational or culture change, the master facility planning team should also include members with expertise in organizational effectiveness, industrial engineering, human resources, and environmental psychology. A recent planning and design project provides an example which illustrates the use of an expanded multi-disciplinary team engaged in planning laboratory renovations for a research organization undergoing programmatic re-direction. The purpose of the proposed poster session is to present a multi-disciplinary master facility planning process linked to an organization`s strategic planning process or organizational strategies.« less

  11. Agent Based Modeling of Collaboration and Work Practices Onboard the International Space Station

    NASA Technical Reports Server (NTRS)

    Acquisti, Alessandro; Sierhuis, Maarten; Clancey, William J.; Bradshaw, Jeffrey M.; Shaffo, Mike (Technical Monitor)

    2002-01-01

    The International Space Station is one the most complex projects ever, with numerous interdependent constraints affecting productivity and crew safety. This requires planning years before crew expeditions, and the use of sophisticated scheduling tools. Human work practices, however, are difficult to study and represent within traditional planning tools. We present an agent-based model and simulation of the activities and work practices of astronauts onboard the ISS based on an agent-oriented approach. The model represents 'a day in the life' of the ISS crew and is developed in Brahms, an agent-oriented, activity-based language used to model knowledge in situated action and learning in human activities.

  12. Combining qualitative and quantitative spatial and temporal information in a hierarchical structure: Approximate reasoning for plan execution monitoring

    NASA Technical Reports Server (NTRS)

    Hoebel, Louis J.

    1993-01-01

    The problem of plan generation (PG) and the problem of plan execution monitoring (PEM), including updating, queries, and resource-bounded replanning, have different reasoning and representation requirements. PEM requires the integration of qualitative and quantitative information. PEM is the receiving of data about the world in which a plan or agent is executing. The problem is to quickly determine the relevance of the data, the consistency of the data with respect to the expected effects, and if execution should continue. Only spatial and temporal aspects of the plan are addressed for relevance in this work. Current temporal reasoning systems are deficient in computational aspects or expressiveness. This work presents a hybrid qualitative and quantitative system that is fully expressive in its assertion language while offering certain computational efficiencies. In order to proceed, methods incorporating approximate reasoning using hierarchies, notions of locality, constraint expansion, and absolute parameters need be used and are shown to be useful for the anytime nature of PEM.

  13. Proceedings of the U.S. Geological Survey Interdisciplinary Microbiology Workshop, Estes Park, Colorado, October 15-17, 2008

    USGS Publications Warehouse

    Briggs, Kay Marano

    2010-01-01

    Preface A U.S. Geological Survey Interdisciplinary Microbiology Workshop was held in Estes Park, Colorado, on October 15-17, 2008. Participants came from all USGS regions and disciplines. This report contains abstracts from 36 presentations and 35 poster sessions and notes from 5 breakout sessions. The seven presentation topics follow: Ecology of wildlife and fish disease Mechanisms of fish and wildlife disease Microbial ecology Geographic patterns/visualization Public health and water quality Geomicrobiology Ecosystem function The six poster session topics follow: Wildlife disease Disease detection methods Water quality Microbial ecology Metabolic processes Tools and techniques Five working groups met in breakout sessions on October 16, 2008. The highlights for each working group are summarized in this report, and their goals are listed below: Working Group I: to plan a Fact Sheet on interdisciplinary microbiology in the USGS Working Group II: to plan a USGS interdisciplinary microbiology Web site Working Group III: to suggest ways to broadcast and publicize the types of microbiology conducted at the USGS Working Group IV: to identify emerging issues in USGS interdisciplinary microbiology research Working Group V: to identify potential opportunities for interdisciplinary microbiology work at the USGS After the workshop, the USGS interdisciplinary microbiology Web site was activated in June 2009 at http://microbiology.usgs.gov/.

  14. Preservice and Inservice Teachers' Challenges in the Planning of Practical Work in Physics

    ERIC Educational Resources Information Center

    Nivalainen, Ville; Asikainen, Mervi A.; Sormunen, Kari; Hirvonen, Pekka E.

    2010-01-01

    Practical work in school science plays many essential roles that have been discussed in the literature. However, less attention has been paid to how teachers learn the different roles of practical work and to the kind of challenges they face in their learning during laboratory courses designed for teachers. In the present study we applied the…

  15. Middle Level Learning Volume 49

    ERIC Educational Resources Information Center

    Lapham, Steven S.; Reader, David; Houting, Beth A. Twiss; Moloshok, Rachel

    2014-01-01

    This article presents two lessons. The first one is "Carved in Stone: The Preamble to the Constitution" by Steven S. Lapham. In 1937, the Works Progress Administration (WPA) commissioned artist Lenore Thomas to create some sculptures for the planned community of Greenbelt, Maryland. Part of her work consisted of bas-relief friezes on the…

  16. The Waiter and Waitress Training Manual. Revised Edition.

    ERIC Educational Resources Information Center

    Mitchell, Barbara J.

    This manual is intended for use in pre-employment or upgrading training programs for persons who are planning to work or are presently working in the hotel and restaurant food service industry. Eleven chapters cover interpersonal relationships with employers, fellow employees, and customers; grooming and personal hygiene; sanitary food handling;…

  17. Distribution automation and control support; Analysis and interpretation of DAC working group results for use in project planning

    NASA Technical Reports Server (NTRS)

    Klock, P.; Evans, D.

    1979-01-01

    The Executive Summary and Proceedings of the Working Group Meeting was analyzed to identify specific projects appropriate for Distribution Automation and Control DAC RD&D. Specific projects that should be undertaken in the DAC RD&D program were recommended. The projects are presented under broad categories of work selected based on ESC's interpretation of the results of the Working Group Meeting. Some of the projects are noted as utility industry projects. The ESC recommendations regarding program management are presented. Utility versus Government management responsibilities are noted.

  18. The Teratology Society 2007 strategic planning session: a desire to inspire.

    PubMed

    2008-05-01

    On April 18-20, 2007, the Teratology Society held its third strategic planning session (SPS) in San Diego, CA. The purpose of this session was to build on the successful work generated by the previous strategic plans [Nashville, TN 2002 and Cincinnati, OH 1997] and importantly, to provide a path forward to inspire the Society, create deeper connections with members that speak to their individual passion for the science of teratology and to increase the Society's visibility within the larger scientific community. The following summary report provides an overview of the session's pre-work, objective, and discussions. A total of 24 attendees were present at the session. The group included representation from Council, various committees and different members constituencies. This plan and the activities subsequent to the session will provide a path forward for our Society for the next five years.

  19. Discussion and Reflection on Several Core Issues in the Grand Canal Heritage Conservation Planning Under the Background of Application for World Heritage

    NASA Astrophysics Data System (ADS)

    Yao, D.; Dai, D. S.; Tang, Y. Z.; Zhu, G. Y.; Chen, X.

    2015-08-01

    At the turn of the century, a series of new heritage concepts have appeared in the area of international cultural heritage protection, such as cultural landscape, cultural route, heritage corridor, heritage canal, which presents the development of people's recognition of cultural heritage. According to The Operational Guidelines for the Implementation of the World Heritage Convention, management planning must be contained in the material used to apply for world heritage. The State Administration of Cultural Heritage designed the mission and work schedule of China's Grand Canal conservation planning in 2008. This research will introduce the working system of China's Grand Canal conservation planning on three levels: city, province and nation. It will also summarize the characteristics of the core technologies in China's Grand Canal conservation planning, including key issues like the identification of the core characteristic of China's Grand Canal, value assessment and determination of the protection scope. Through reviewing, thinking and analyzing the previous accomplishments, the research will offer some advices for the similar world heritage conservation planning after.

  20. 7 CFR 23.6 - Plan of Work.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 1 2011-01-01 2011-01-01 false Plan of Work. 23.6 Section 23.6 Agriculture Office of the Secretary of Agriculture STATE AND REGIONAL ANNUAL PLANS OF WORK State Program § 23.6 Plan of Work. (a) A State Annual Plan of Work for carrying out the programs authorized under title V shall be...

  1. 7 CFR 23.6 - Plan of Work.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Plan of Work. 23.6 Section 23.6 Agriculture Office of the Secretary of Agriculture STATE AND REGIONAL ANNUAL PLANS OF WORK State Program § 23.6 Plan of Work. (a) A State Annual Plan of Work for carrying out the programs authorized under title V shall be...

  2. Structural dynamics division research and technology accomplishments for fiscal year 1990 and plans for fiscal year 1991

    NASA Technical Reports Server (NTRS)

    Wynne, Eleanor C.

    1991-01-01

    The research accomplishments of the Structural Dynamics Division for F.Y. 1991 are presented. The work is discussed in terms of highlights of accomplishments during the past year and plans for the current year as they relate to 5-year plans and the objectives of each technical area. Included is research on unsteady aerodynamics, helicopter rotors, computational fluid dynamics, oscillations of leading edge flaps of a delta wing, and aircraft wing loads.

  3. Automated survey of 8000 plan checks at eight facilities.

    PubMed

    Halabi, Tarek; Lu, Hsiao-Ming; Bernard, Damian A; Chu, James C H; Kirk, Michael C; Hamilton, Russell J; Lei, Yu; Driewer, Joseph

    2016-09-01

    To identify policy and system related weaknesses in treatment planning and plan check work-flows. The authors' web deployed plan check automation solution, PlanCheck, which works with all major planning and record and verify systems (demonstrated here for mosaiq only), allows them to compute violation rates for a large number of plan checks across many facilities without requiring the manual data entry involved with incident filings. Workflows and failure modes are heavily influenced by the type of record and verify system used. Rather than tackle multiple record and verify systems at once, the authors restricted the present survey to mosaiq facilities. Violations were investigated by sending inquiries to physicists running the program. Frequent violations included inadequate tracking in the record and verify system of total and prescription doses. Infrequent violations included incorrect setting of patient orientation in the record and verify system. Peaks in the distribution, over facilities, of violation frequencies pointed to suboptimal policies at some of these facilities. Correspondence with physicists often revealed incomplete knowledge of settings at their facility necessary to perform thorough plan checks. The survey leads to the identification of specific and important policy and system deficiencies that include: suboptimal timing of initial plan checks, lack of communication or agreement on conventions surrounding prescription definitions, and lack of automation in the transfer of some parameters.

  4. Experimental investigation about the effect of non-axisymmetric wake impact on a low speed axial compressor

    NASA Astrophysics Data System (ADS)

    Liu, Jianyong; Lu, Yajun; Li, Zhiping

    2010-05-01

    Non-axisymmetric wake impact experiments were carried out after the best exciting frequency for a low speed axial compressor had been found by axisymmetric wake impact experiments. When the number and circumferential distribution of inlet guide vanes (IGV) are logical the wakes of non-axisymmetric IGVs can exert beneficial unsteady exciting effect on their downstream rotor flow fields and improve the compressor’s performance. In the present paper, four non-axisymmetric wake impact plans were found working better than the axisymmetric wake impact plan. Compared with the base plan, the best non-axisymmetric plan increased the compressor’s peak efficiency, and the total pressure rise by 1.1 and 2%, and enhanced the stall margin by 4.4%. The main reason why non-axisymmetric plans worked better than the axisymmetric plan was explained as the change of the unsteady exciting signal arising from IGV wakes. Besides the high-frequency components, the non-axisymmetric plan generated a beneficial low-frequency square-wave exciting signal and other secondary frequency components. Compared with the axisymmetric plan, multi-frequency exciting wakes arising from the non-axisymmetric plans are easier to get coupling relation with complex vortices such as clearance vortices, passage vortices and shedding vortices.

  5. University of South Florida St. Petersburg Work Plan Presentation for 2013-14 Board of Governors Review

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2013

    2013-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  6. University of South Florida--System Work Plan Presentation for 2012-13 Board of Governors Review

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2012

    2012-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  7. University of South Florida Sarasota-Manatee Work Plan Presentation for 2013-14 Board of Governors Review

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2013

    2013-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  8. University of South Florida Tampa Work Plan Presentation for 2013-14 Board of Governors Review

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2013

    2013-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  9. University of South Florida System Work Plan Presentation for 2014-15 Board of Governors Review

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  10. University of South Florida St. Petersburg Work Plan Presentation for 2014-15 Board of Governors Review

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  11. Longitudinal Relationships between Planned Happenstance Skills and Life Adjustment and the Moderating Role of Career Barriers

    ERIC Educational Resources Information Center

    Kim, Boyoung; Kim, So Rin; Yang, Na Yeon; Yaung, Huk; Ha, Gyu Young; Yang, Joon Young; Lee, Bora; Lee, Sang Min

    2018-01-01

    The purpose of the present study was to examine the longitudinal relationships between planned happenstance skills (PHS) and life adjustment and to examine whether this relationship was moderated by the degree of career barriers. The participants were 307 Korean college students going through a school-to-work transition. The results showed that…

  12. Evaluation of scheduling techniques for payload activity planning

    NASA Technical Reports Server (NTRS)

    Bullington, Stanley F.

    1991-01-01

    Two tasks related to payload activity planning and scheduling were performed. The first task involved making a comparison of space mission activity scheduling problems with production scheduling problems. The second task consisted of a statistical analysis of the output of runs of the Experiment Scheduling Program (ESP). Details of the work which was performed on these two tasks are presented.

  13. Estate planning for forest landowners: what will become of your timberland?

    Treesearch

    William C. Siegel; Harry L. Haney; John L. Greene

    2009-01-01

    The purpose of this book is to provide guidelines and assistance to nonindustrial private forest owners and the legal, tax, financial, insurance, and forestry professionals who serve them on the application of estate planning techniques to forest properties. The book presents a working knowledge of the Federal estate and gift tax law as of September 30, 2008, with...

  14. Joint Venture Marketing Training: Development Marketing Plans Utilizing Foreign and American Students.

    ERIC Educational Resources Information Center

    Steele, David; Jones, Kevin

    This paper describes a workshop prepared and presented by the Business Administration Department of the University of Wisconsin-Eau Claire, that is designed to provide training in evaluating a European market for an American product and preparing a plan for marketing the product in Europe. It is noted that the program can work with both students…

  15. Integrated risk management

    NASA Technical Reports Server (NTRS)

    Hunsucker, J. L.

    1993-01-01

    The purpose of this report is to first present a basis or foundation for the building of an integrated risk management plan and them to present the plan. The integration referred to is across both the temporal and the hierarchical dimensions. Complexity, consequence, and credibility seem to be driving the need for the consideration of risk. Reduction of personal bias and reproducibility of the decision making process seem to be driving the consideration of a formal risk plan. While risk can be used as either a selection tool or a control tool, this paper concentrates on the selection usage. Risk relies on stated purpose. The tightness of the definition of purpose and success is directly reflected in the definition and control of risk. Much of a risk management plan could be designed by the answers to the questions of why, what, who, when, and where. However, any plan must provide the following information about a threat or risk: likelihood, consequence, predictability, reliability, and reproducibility. While the environment at NASA is seen as warm, but not hot, for the introduction of a risk program, some encouragement is seen if the following problems are addressed: no champion, no commitment of resource, confused definitions, lack of direction and focus, a hard sell, NASA culture, many choices of assessment methods, and cost. The plan is designed to follow the normal method of doing work and is structured to follow either the work break down structure or a functional structure very well. The parts of the plan include: defining purpose and success, initial threat assessment, initial risk assessment, reconciling threats and parameters, putting part of the information down and factoring the information back into the decision process as it comes back up, and developing inferences. Two major suggestions are presented. One is to build an office of risk management to be used as a resource by managers in doing the risk process. Another is to form a pilot program to try out the details in the plan and modify the method where needed.

  16. Working Group 1: Current plans of various organisations for lunar activities

    NASA Technical Reports Server (NTRS)

    Balsiger, H.; Pilcher, C.

    1994-01-01

    Summaries of presentations by representatives of several space agencies and the International Academy of Astronautics concerning lunar activities are presented. Participating space agencies reported two different types of lunar planning, long term planning and scenarios and lunar missions competing within regular programs. The long term plans of the various agencies look remarkably similar. They all involve a phased approach (coincidentally all incorporating four phases) and all address three prime scientific elements: science of, on, and from the Moon. The missions under consideration by the second group of agencies could readily fit as elements in the longer term program. There is great interest in lunar astronomy. There is a great deal of potential infrastructure and lunar transport capability already available. There is also a wide range of interesting technological developments that could form part of a lunar program. A well concerted and coordinated international effort could lead to an affordable program. Recommendations are: an international conference on lunar exploration should be held every other year; an electronic network should be established for the daily exchange of information; and a mechanism should be established for regular working level coordination of activities.

  17. Make Your Presentation Powerful

    ERIC Educational Resources Information Center

    Palmer, Erik

    2015-01-01

    "I was planning on doing a lot of work today during your presentation, but I couldn't get anything done. I just had to pay attention!" The author received this unexpected feedback from a teacher at the end of a presentation he gave, and although he considered it a compliment, it made him reflect on the dire state of presentations in…

  18. User interface development

    NASA Technical Reports Server (NTRS)

    Aggrawal, Bharat

    1994-01-01

    This viewgraph presentation describes the development of user interfaces for OS/2 versions of computer codes for the analysis of seals. Current status, new features, work in progress, and future plans are discussed.

  19. Mobile Launch Platform Vehicle Assembly Area (SWMU 056) Biosparge Expansion Interim Measures Work Plan

    NASA Technical Reports Server (NTRS)

    Burcham, Michael S.; Daprato, Rebecca C.

    2016-01-01

    This document presents the design details for an Interim Measure (IM) Work Plan (IMWP) for the Mobile Launch Platform/Vehicle Assembly Building (MLPV) Area, located at the John F. Kennedy Space Center (KSC), Florida. The MLPV Area has been designated Solid Waste Management Unit Number 056 (SWMU 056) under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This report was prepared by Geosyntec Consultants (Geosyntec) for the National Aeronautics and Space Administration (NASA) under contract number NNK09CA02B and NNK12CA13B, project control number ENV1642. The Advanced Data Package (ADP) presentation covering the elements of this IMWP report received KSC Remediation Team (KSCRT) approval at the December 2015 Team Meeting; the meeting minutes are included in Appendix A.

  20. Teacher Professional Development to Foster Authentic Student Research Experiences

    NASA Astrophysics Data System (ADS)

    Conn, K.; Iyengar, E.

    2004-12-01

    This presentation reports on a new teacher workshop design that encourages teachers to initiate and support long-term student-directed research projects in the classroom setting. Teachers were recruited and engaged in an intensive marine ecology learning experience at Shoals Marine Laboratory, Appledore Island, Maine. Part of the weeklong summer workshop was spent in field work, part in laboratory work, and part in learning experimental design and basic statistical analysis of experimental results. Teachers were presented with strategies to adapt their workshop learnings to formulate plans for initiating and managing authentic student research projects in their classrooms. The authors will report on the different considerations and constraints facing the teachers in their home school settings and teachers' progress in implementing their plans. Suggestions for replicating the workshop will be offered.

  1. Educative Supervision in International Cooperation Contexts

    ERIC Educational Resources Information Center

    Ortiz, Ana; Valdivia-Moral, Pedro; Cachón, Javier; Prieto, Joel

    2015-01-01

    This present paper has got a clear goal: to contextualize education for development in the present moment, planning its evolution and the keys that characterize education collected from the most representative and up-to-date pieces of work. The experience that we present is integrated in a project developed in Paraguay that is expected to describe…

  2. The space shuttle payload planning working groups. Volume 5: Solar physics

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The findings of the Solar Physics working group of the space shuttle payload planning activity are presented. The areas to be investigated by the solar physics experiments are: (1) the production of mechanical energy in the subphotospheric layers and its transport and dissipation in the upper layers of the atmosphere, (2) the mass flux from the subphotospheric layers into the chromosphere and corona and beyond the solar wind, (3) solar activity and its relationship to magnetic fields, and (4) the production of solar flares. The approach to be followed in conducting the experiments and the equipment required are defined.

  3. The space shuttle payload planning working groups. Volume 7: Earth observations

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The findings of the Earth Observations working group of the space shuttle payload planning activity are presented. The objectives of the Earth Observation experiments are: (1) establishment of quantitative relationships between observable parameters and geophysical variables, (2) development, test, calibration, and evaluation of eventual flight instruments in experimental space flight missions, (3) demonstration of the operational utility of specific observation concepts or techniques as information inputs needed for taking actions, and (4) deployment of prototype and follow-on operational Earth Observation systems. The basic payload capability, mission duration, launch sites, inclinations, and payload limitations are defined.

  4. Proposed work plan for the study of hydrologic effects of ground-water development in the Wet Mountain Valley, Colorado

    USGS Publications Warehouse

    Robson, S.G.

    1985-01-01

    Large-scale development of groundwater resources in the Wet Mountain Valley, Colorado, could adversely affect other water rights in the valley or in the Arkansas River Basin. Such infringement on senior water rights could severely limit development of additional water supplies in the valley. A work plan is presented for a study that is intended to define the hydrologic system in the valley better, and to determine the extent that the quantity and chemical quality of both surface and groundwater in the valley might be affected by proposed development. (USGS)

  5. Agency behind bars: Advance care planning with aging and dying offenders.

    PubMed

    Sanders, Sara; Stensland, Meredith; Juraco, Kim

    2018-01-01

    Aging and terminally ill individuals in U.S. prisons are increasing, making critical the need for appropriate end-of-life (EOL) care and advance care planning (ACP). Applying Bandura's agentic perspective, the authors examined 20 aging/dying offenders' EOL preferences and ACP. Findings include 6 themes: decisions in the shadow of the past, what works best for me, feeling blessed, what is really going on, can anyone be trusted, and turning agency over to someone else. This study provides critical information that will assist professionals who work with dying offenders, as it presents a vivid illustration of their dying process.

  6. CxP Wireless DFI Summary Presentation for OTI Flight Test Working Group

    NASA Technical Reports Server (NTRS)

    Arteaga, Ricardo A.

    2009-01-01

    This slide presentation reviews the wireless instrumentation architecture needed for the Alatir Lunar Lander, Ares I, Ares V, and the Block II Orion Crew Exploration Vehicle (CEV). It includes information about the Wireless DFI system, mission planning, and the technology roadmap.

  7. The Chinese People’s Militia and the Doctrine of People’s War,

    DTIC Science & Technology

    1983-01-01

    matter of PRC military modernization and related defense issues. The National De- fense University is pleased to present this work for discussion in the...specific functional area of GSD work . The General Logistics Department (GLD) is responsible for centralized logistics planning, procurement, and...Exercising leadership over political security work and supervising military procuratorates and courts. * Publishing PLA newspapers and other publications

  8. 7 CFR 1924.5 - Planning development work.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 12 2011-01-01 2011-01-01 false Planning development work. 1924.5 Section 1924.5... Planning development work. (a) Extent of development. For an FO loan, the plans for development will... for development work. The total cash cost of all planned development will be shown on Form FmHA or its...

  9. Planning to Explore: Using a Coordinated Multisource Infrastructure to Overcome Present and Future Space Flight Planning Challenges

    NASA Technical Reports Server (NTRS)

    Balaban, Edward; Orosz, Michael; Kichkaylo, Tatiana; Goforth, Andre; Sweet, Adam; Neches, Robert

    2006-01-01

    Few human endeavors present as much of a planning and scheduling challenge as space flight, particularly manned space flight. Just on the operational side of it, efforts of thousands of people across hundreds of organizations need to be coordinated. Numerous tasks of varying complexity and nature, from scientific to construction, need to be accomplished within limited mission time frames. Resources need to be carefully managed and contingencies worked out, often on a very short notice. From the beginning of the NASA space program, planning has been done by large teams of domain experts working months, sometimes years, to put together a single mission. This approach, while proven very reliable up to now, is becoming increasingly harder to sustain. Elevated levels of NASA space activities, from deployment of the new Crew Exploration Vehicle (CEV) and completion of the International Space Station (ISS), to the planned lunar missions and permanent lunar bases, will put an even greater strain on this largely manual process. While several attempts to automate it have been made in the past, none have fully succeeded. In this paper we describe the current NASA planning methods, outline their advantages and disadvantages, discuss the planning challenges of upcoming missions and propose a distributed planning/scheduling framework (CMMD) aimed at unifying and optimizing the planning effort. CMMD will not attempt to make the process completely automated, but rather serve in a decision support capacity for human managers and planners. It will help manage information gathering, creation of partial and consolidated schedules, inter-team negotiations, contingencies investigation, and rapid re-planning when the situation demands it. The fist area of CMMD application will be planning for Extravehicular Activities (EVA) and associated logistics. Other potential applications, not only in the space flight domain, and future research efforts will be discussed as well.

  10. Industrial Fuel Gas Demonstration Plant Program: environmental permit compliance plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bodamer, Jr., James W.; Bocchino, Robert M.

    1979-11-01

    This Environmental Permit Compliance Plan is intended to assist the Memphis Light, Gas and Water Division in acquiring the necessary environmental permits for their proposed Industrial Fuel Gas Demonstration Plant in a time frame consistent with the construction schedule. Permits included are those required for installation and/or operation of gaseous, liquid and solid waste sources and disposal areas. Only those permits presently established by final regulations are described. The compliance plan describes procedures for obtaining each permit from identified federal, state and local agencies. The information needed for the permit application is presented, and the stepwise procedure to follow whenmore » filing the permit application is described. Information given in this plan was obtained by reviewing applicable laws and regulations and from telephone conversations with agency personnel on the federal, state and local levels. This Plan also presents a recommended schedule for beginning the work necessary to obtain the required environmental permits in order to begin dredging operations in October, 1980 and construction of the plant in September, 1981. Activity for several key permits should begin as soon as possible.« less

  11. Presenting Bionic: Broader Impacts and Outreach Network for Institutional Collaboration

    NASA Astrophysics Data System (ADS)

    Storm, K.

    2014-12-01

    Broader Impact plans are required of all NSF proposals. In 2011 the National Science Board, which oversees NSF, reconfirmed NSF's commitment to Broader Impacts in its task force report on the merit review system. At many institutions there are professionals that focus their work on supporting the Broader Impact work of researchers. This session will share the Broader Impacts and Outreach Network for Institutional Collaboration (BIONIC) plan to create a professional network of individuals and offices committed to planning and carrying out effective Broader Impact programming. BIONIC is an NSF Research Coordination Network that is recommended for funding through the Biology Directorate. In this session we will share the goals of BIONIC, and the progress to date in reaching those goals (of which one aspect is the curating of effective Broader Impact initiatives).

  12. Self Assessment Guidelines for Administrators of High School Cooperative Work Experience Programs.

    ERIC Educational Resources Information Center

    National Child Labor Committee, New York, NY.

    A self-assessment questionnaire is presented in this document for use by high school administrators collecting information on which to base recommendations and plans for improving the effectiveness of cooperative work experience (CWE) programs. A format for assessment in each of the following areas is given: characteristics of students, staff, and…

  13. Validation of the maximum allowable amounts of recycled binder, RAP, and RAS using accelerated pavement testing - interim report.

    DOT National Transportation Integrated Search

    2014-05-01

    This report summarizes the work conducted on Project 0-6682 up to August 31, 2013. The report is : organized in five chapters corresponding to separate tasks in the project work plan, as follows: : Chapter 1 presents the summary of the findings f...

  14. Socially Conscious Ventures and Experiential Learning: Perceptions of Student Engagement

    ERIC Educational Resources Information Center

    Vasbinder, William; Koehler, William

    2015-01-01

    This qualitative study explored stakeholder perceptions of the outcomes of semester-long experiential learning projects in five selected business courses at a small, private college. Students worked with the owners of socially conscious startup firms to develop and present strategic marketing and business plans. The work draws upon interviews with…

  15. The public and wildland fire management: social science findings for managers

    Treesearch

    S.M. McCaffrey

    2006-01-01

    Presents key social science findings from three National Fire Plan-sponsored research projects. Articles highlight information of likely interest to individuals working to decrease wildfire hazards on both private and public lands. Three general topic areas are addressed: (1) public views and acceptance of fuels management, (2) working with homeowners and communities,...

  16. The Virtual Factory Teaching System (VFTS): Project Review and Results.

    ERIC Educational Resources Information Center

    Kazlauskas, E. J.; Boyd, E. F., III; Dessouky, M. M.

    This paper presents a review of the Virtual Factory Teaching (VFTS) project, a Web-based, multimedia collaborative learning network. The system allows students, working alone or in teams, to build factories, forecast demand for products, plan production, establish release rules for new work into the factory, and set scheduling rules for…

  17. ESL Teacher Training: Worksheets for Teachers of Adult Migrants.

    ERIC Educational Resources Information Center

    Dickie, J. A.; Lewis, Marilyn

    Instructional materials are presented for teachers working with classes of adult migrants at technical institutes, high schools, or community centers in New Zealand. The materials are planned to be used in group training sessions, and the handbook includes suggestions for discussions, group tasks, and individual work. The handbook may be used for…

  18. Work and Family Policies: The New Strategic Plan. Research Report Number 949.

    ERIC Educational Resources Information Center

    Peters, James L., Ed.; And Others

    These 38 presentations are the highlights of the Conference Board's Work and Family Conference. An "Introduction" (Dana Friedman) is followed by "The Future Is Not What It Was, and Why Companies Care" (William Lee, Reuben Mark), which consists of introductory remarks and responses to an interview. "The Diversity of…

  19. Women and the World of Work.

    ERIC Educational Resources Information Center

    Tobin, Nancy; Wilson, Barbara Lazarus

    One of the products developed by the Home and Community-Based Career Education Project, the booklet focuses on the concerns of women who want or need to begin or resume a career. It describes today's working woman, examines her options, and presents practical suggestions for overcoming obstacles in planning for and implementing career decisions.…

  20. A Framework for Teaching Practice-Based Research with a Focus on Service Users

    ERIC Educational Resources Information Center

    Austin, Michael J.; Isokuortti, Nanne

    2016-01-01

    The integration of research and practice in social work education and agency practice is both complex and challenging. The analysis presented here builds upon the classic social work generalist framework (engagement, assessment, service planning and implementation, service evaluation, and termination) by developing a three-part framework to…

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Barbee, D; McCarthy, A; Galavis, P

    Purpose: Errors found during initial physics plan checks frequently require replanning and reprinting, resulting decreased departmental efficiency. Additionally, errors may be missed during physics checks, resulting in potential treatment errors or interruption. This work presents a process control created using the Eclipse Scripting API (ESAPI) enabling dosimetrists and physicists to detect potential errors in the Eclipse treatment planning system prior to performing any plan approvals or printing. Methods: Potential failure modes for five categories were generated based on available ESAPI (v11) patient object properties: Images, Contours, Plans, Beams, and Dose. An Eclipse script plugin (PlanCheck) was written in C# tomore » check errors most frequently observed clinically in each of the categories. The PlanCheck algorithms were devised to check technical aspects of plans, such as deliverability (e.g. minimum EDW MUs), in addition to ensuring that policy and procedures relating to planning were being followed. The effect on clinical workflow efficiency was measured by tracking the plan document error rate and plan revision/retirement rates in the Aria database over monthly intervals. Results: The number of potential failure modes the PlanCheck script is currently capable of checking for in the following categories: Images (6), Contours (7), Plans (8), Beams (17), and Dose (4). Prior to implementation of the PlanCheck plugin, the observed error rates in errored plan documents and revised/retired plans in the Aria database was 20% and 22%, respectively. Error rates were seen to decrease gradually over time as adoption of the script improved. Conclusion: A process control created using the Eclipse scripting API enabled plan checks to occur within the planning system, resulting in reduction in error rates and improved efficiency. Future work includes: initiating full FMEA for planning workflow, extending categories to include additional checks outside of ESAPI via Aria database queries, and eventual automated plan checks.« less

  2. A selective annotated bibliography for clinical audiology (1989-2009): books.

    PubMed

    Ferrer-Vinent, Susan T; Ferrer-Vinent, Ignacio J

    2010-12-01

    This is the 2nd in a series of 3 planned companion articles that present a selected, annotated, and indexed bibliography of clinical audiology publications from 1989 through 2009. Research and preparation of the bibliography were based on published guidelines, professional audiology experience, and professional librarian experience. The first article in the series covered reference works. This article focuses on other books. The planned third companion article will present periodicals and online resources. Audiologists and librarians can use this bibliography to help them identify relevant clinical audiology literature.

  3. Planning Self-Managed Work Groups. Features of Self-Managed Work Groups. Results of Using Self-Managed Work Groups. Issues and Implications in Using Self-Managed Work Groups. Status of Ohio Manufacturing Companies.

    ERIC Educational Resources Information Center

    Smylie, Patrick E.; Jacobs, Ronald L.

    A study was conducted to describe the present status of self-managed work groups in Ohio manufacturing companies. Data for the study were gathered through lengthy interviews and site visits with 45 manufacturing companies in the state, 24 employing 2,000-14,000 workers and 21 employing 300 to 1,900 workers. The results of the study are presented…

  4. Towards Assessing the Human Trajectory Planning Horizon

    PubMed Central

    Nitsch, Verena; Meinzer, Dominik; Wollherr, Dirk

    2016-01-01

    Mobile robots are envisioned to cooperate closely with humans and to integrate seamlessly into a shared environment. For locomotion, these environments resemble traversable areas which are shared between multiple agents like humans and robots. The seamless integration of mobile robots into these environments requires accurate predictions of human locomotion. This work considers optimal control and model predictive control approaches for accurate trajectory prediction and proposes to integrate aspects of human behavior to improve their performance. Recently developed models are not able to reproduce accurately trajectories that result from sudden avoidance maneuvers. Particularly, the human locomotion behavior when handling disturbances from other agents poses a problem. The goal of this work is to investigate whether humans alter their trajectory planning horizon, in order to resolve abruptly emerging collision situations. By modeling humans as model predictive controllers, the influence of the planning horizon is investigated in simulations. Based on these results, an experiment is designed to identify, whether humans initiate a change in their locomotion planning behavior while moving in a complex environment. The results support the hypothesis, that humans employ a shorter planning horizon to avoid collisions that are triggered by unexpected disturbances. Observations presented in this work are expected to further improve the generalizability and accuracy of prediction methods based on dynamic models. PMID:27936015

  5. A New U.S. Carbon Cycle Science Plan

    NASA Astrophysics Data System (ADS)

    Michalak, A. M.; Jackson, R.; Marland, G.; Sabine, C.

    2009-05-01

    The report "A U.S. carbon cycle science plan" (J. L. Sarmiento and S. C. Wofsy, U.S. Global Change Res. Program, Washington, D. C., 1999) outlined research priorities and promoted coordinated carbon cycle research across federal agencies in the United States for nearly a decade. Building on this framework and subsequent reports (http://www.carboncyclescience.gov/docs.php), a working group comprised of 27 scientists was formed in 2008 under the United States Carbon Cycle Science Program to review the 1999 Science Plan, and to develop an updated strategy for carbon cycle research for the period from 2010 to 2020. This comprehensive review is being conducted with wide input from the research and stakeholder communities. The recommendations of the Carbon Cycle Science Working Group (CCSWG) will go to U.S. agency managers who have collective responsibility for setting national carbon cycle science priorities and for sponsoring much of the carbon cycle research in the United States. This presentation will provide an update on the ongoing planning process, will outline the steps that the CCSWG is undertaking in building consensus towards an updated U.S. Carbon Cycle Science Plan, and will seek input on the best ways in which to coordinate efforts with ongoing and upcoming research in Canada and Mexico, as well as with ongoing work globally.

  6. Towards Assessing the Human Trajectory Planning Horizon.

    PubMed

    Carton, Daniel; Nitsch, Verena; Meinzer, Dominik; Wollherr, Dirk

    2016-01-01

    Mobile robots are envisioned to cooperate closely with humans and to integrate seamlessly into a shared environment. For locomotion, these environments resemble traversable areas which are shared between multiple agents like humans and robots. The seamless integration of mobile robots into these environments requires accurate predictions of human locomotion. This work considers optimal control and model predictive control approaches for accurate trajectory prediction and proposes to integrate aspects of human behavior to improve their performance. Recently developed models are not able to reproduce accurately trajectories that result from sudden avoidance maneuvers. Particularly, the human locomotion behavior when handling disturbances from other agents poses a problem. The goal of this work is to investigate whether humans alter their trajectory planning horizon, in order to resolve abruptly emerging collision situations. By modeling humans as model predictive controllers, the influence of the planning horizon is investigated in simulations. Based on these results, an experiment is designed to identify, whether humans initiate a change in their locomotion planning behavior while moving in a complex environment. The results support the hypothesis, that humans employ a shorter planning horizon to avoid collisions that are triggered by unexpected disturbances. Observations presented in this work are expected to further improve the generalizability and accuracy of prediction methods based on dynamic models.

  7. Critical Drivers for Safety Culture: Examining Department of Energy and U.S. Army Operational Experiences - 12382

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lowes, Elizabeth A.

    2012-07-01

    Evaluating operational incidents can provide a window into the drivers most critical to establishing and maintaining a strong safety culture, thereby minimizing the potential project risk associated with safety incidents. By examining U.S. Department of Energy (DOE) versus U.S. Army drivers in terms of regulatory and contract requirements, programs implemented to address the requirements, and example case studies of operational events, a view of the elements most critical to making a positive influence on safety culture is presented. Four case studies are used in this evaluation; two from DOE and two from U.S. Army experiences. Although the standards guiding operationsmore » at these facilities are different, there are many similarities in the level of hazards, as well as the causes and the potential consequences of the events presented. Two of the incidents examined, one from a DOE operation and the other from a U.S. Army facility, resulted in workers receiving chemical burns. The remaining two incidents are similar in that significant conduct of operations failures occurred resulting in high-level radioactive waste (in the case of the DOE facility) or chemical agent (in the case of the Army facility) being transferred outside of engineering controls. A review of the investigation reports for all four events indicates the primary causes to be failures in work planning leading to ineffective hazard evaluation and control, lack of procedure adherence, and most importantly, lack of management oversight to effectively reinforce expectations for safe work planning and execution. DOE and Army safety programs are similar, and although there are some differences in contractual requirements, the expectations for safe performance are essentially the same. This analysis concludes that instilling a positive safety culture comes down to management leadership and engagement to (1) cultivate an environment that values a questioning attitude and (2) continually reinforce expectations for the appropriate level of rigor in work planning and procedure adherence. A review of the root causes and key contributing causes to the events indicate: - Three of the four root cause analyses cite lack of management engagement (oversight, involvement, ability to recognize issues, etc.) as a root cause to the events. - Two of the four root cause analyses cite work planning failures as a root cause to the events and all cause analyses reflect work planning failures as contributing factors to the events. - All events with the exception of the Tuba City plant shutdown indicate procedure noncompliance as a key contributor; in the case of Tuba City the procedure issues were primarily related to a lack of procedures, or a lack of sufficiently detailed procedures. - All events included discussion or suggestion of a lack of a questioning attitude, either on the part of management/supervision, work planners, or workers. This analysis suggests that the most critical drivers to safety culture are: - Management engagement, - Effective work planning and procedures, and - Procedure adherence with a questioning attitude to ensure procedural problems are identified and fixed. In high-hazard operational environments the importance of robust work planning processes and procedure adherence cannot be overstated. However, having the processes by themselves is not enough. Management must actively engage in expectation setting and ensure work planning that meets expectations for hazard analysis and control, develop a culture that encourages incident reporting and a questioning attitude, and routinely observe work performance to reinforce expectations for adherence to procedures/work control documents. In conclusion, the most critical driver to achieving a workforce culture that supports safe and effective project performance can be summarized as follows: 'Management engagement to continually reinforce expectations for work planning processes and procedure adherence in an environment that cultivates a questioning attitude'. (authors)« less

  8. An Internationally Coordinated Science Management Plan for Samples Returned from Mars

    NASA Astrophysics Data System (ADS)

    Haltigin, T.; Smith, C. L.

    2015-12-01

    Mars Sample Return (MSR) remains a high priority of the planetary exploration community. Such an effort will undoubtedly be too large for any individual agency to conduct itself, and thus will require extensive global cooperation. To help prepare for an eventual MSR campaign, the International Mars Exploration Working Group (IMEWG) chartered the international Mars Architecture for the Return of Samples (iMARS) Phase II working group in 2014, consisting of representatives from 17 countries and agencies. The overarching task of the team was to provide recommendations for progressing towards campaign implementation, including a proposed science management plan. Building upon the iMARS Phase I (2008) outcomes, the Phase II team proposed the development of an International MSR Science Institute as part of the campaign governance, centering its deliberations around four themes: Organization: including an organizational structure for the Institute that outlines roles and responsibilities of key members and describes sample return facility requirements; Management: presenting issues surrounding scientific leadership, defining guidelines and assumptions for Institute membership, and proposing a possible funding model; Operations & Data: outlining a science implementation plan that details the preliminary sample examination flow, sample allocation process, and data policies; and Curation: introducing a sample curation plan that comprises sample tracking and routing procedures, sample sterilization considerations, and long-term archiving recommendations. This work presents a summary of the group's activities, findings, and recommendations, highlighting the role of international coordination in managing the returned samples.

  9. Inversion layer MOS solar cells

    NASA Technical Reports Server (NTRS)

    Ho, Fat Duen

    1986-01-01

    Inversion layer (IL) Metal Oxide Semiconductor (MOS) solar cells were fabricated. The fabrication technique and problems are discussed. A plan for modeling IL cells is presented. Future work in this area is addressed.

  10. Norms and the Perception of Events

    DTIC Science & Technology

    1992-01-31

    Experimental Psychology: Human Perception and Performance. 12, 1986, 445-454. Brickman, P., and D.T. Campbell. Hedonic relativism and planning the good ...interesting problem, which we plan to explore in further work. Table 1-3 presents results for conditions involving objects, actions and changes. We...following stem completion appeared: Alfred’s performance on the fourth afternoon was [] Very Good [I Good [] Fairly Good [I Nothing Special [] Rather Bad

  11. Considerations of MCNP Monte Carlo code to be used as a radiotherapy treatment planning tool.

    PubMed

    Juste, B; Miro, R; Gallardo, S; Verdu, G; Santos, A

    2005-01-01

    The present work has simulated the photon and electron transport in a Theratron 780® (MDS Nordion)60Co radiotherapy unit, using the Monte Carlo transport code, MCNP (Monte Carlo N-Particle). This project explains mainly the different methodologies carried out to speedup calculations in order to apply this code efficiently in radiotherapy treatment planning.

  12. Cognitive Works Aids for C2 Planning: Actionable Information to Support Operational Decision Making

    DTIC Science & Technology

    2005-06-01

    Information to Support Operational Decision Making Topic: Decisionmaking and Cognitive Science Jeffrey Wampler†*, Randall Whitaker§, Emilie...channeled through this state-of- the- art mobility C2 hub. It is a global AOC with several hundred people planning and executing around 350 missions...2005 Topical Area: Decisionmaking and Cognitive Science CONFERENCE PRESENTATION BY: RANDALL WHITAKER, PH.D. NORTHROP GRUMMAN INFORMATION TECHNOLOGY

  13. Formalizing Resources for Planning

    NASA Technical Reports Server (NTRS)

    Bedrax-Weiss, Tania; McGann, Conor; Ramakrishnan, Sailesh

    2003-01-01

    In this paper we present a classification scheme which circumscribes a large class of resources found in the real world. Building on the work of others we also define key properties of resources that allow formal expression of the proposed classification. Furthermore, operations that change the state of a resource are formalized. Together, properties and operations go a long way in formalizing the representation and reasoning aspects of resources for planning.

  14. 7 CFR 1717.604 - Long-range engineering plans and construction work plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...

  15. 7 CFR 1717.604 - Long-range engineering plans and construction work plans.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 11 2013-01-01 2013-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...

  16. 7 CFR 1717.604 - Long-range engineering plans and construction work plans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 11 2014-01-01 2014-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...

  17. 7 CFR 1717.604 - Long-range engineering plans and construction work plans.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 11 2012-01-01 2012-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...

  18. 7 CFR 1717.604 - Long-range engineering plans and construction work plans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 11 2011-01-01 2011-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...

  19. Final Inventory Work-Off Plan for ORNL transuranic wastes (1986 version)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dickerson, L.S.

    1988-05-01

    The Final Inventory Work-Off Plan (IWOP) for ORNL Transuranic Wastes addresses ORNL's strategy for retrieval, certification, and shipment of its stored and newly generated contact-handled (CH) and remote-handled (RH) transuranic (TRU) wastes to the Waste Isolation Pilot Plant (WIPP), the proposed geologic repository near Carlsbad, New Mexico. This document considers certification compliance with the WIPP waste acceptance criteria (WAC) and is consistent with the US Department of Energy's Long-Range Master Plan for Defense Transuranic Waste Management. This document characterizes Oak Ridge National Laboratory's (ORNL's) TRU waste by type and estimates the number of shipments required to dispose of it; describesmore » the methods, facilities, and systems required for its certification and shipment; presents work-off strategies and schedules for retrieval, certification, and transportation; discusses the resource needs and additions that will be required for the effort and forecasts costs for the long-term TRU waste management program; and lists public documentation required to support certification facilities and strategies. 22 refs., 6 figs., 10 tabs.« less

  20. SU-E-T-149: Brachytherapy Patient Specific Quality Assurance for a HDR Vaginal Cylinder Case

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Barbiere, J; Napoli, J; Ndlovu, A

    2015-06-15

    Purpose: Commonly Ir-192 HDR treatment planning system commissioning is only based on a single absolute measurement of source activity supplemented by tabulated parameters for multiple factors without independent verification that the planned distribution corresponds to the actual delivered dose. The purpose on this work is to present a methodology using Gafchromic film with a statistically valid calibration curve that can be used to validate clinical HDR vaginal cylinder cases by comparing the calculated plan dose distribution in a plane with the corresponding measured planar dose. Methods: A vaginal cylinder plan was created with Oncentra treatment planning system. The 3D dosemore » matrix was exported to a Varian Eclipse work station for convenient extraction of a 2D coronal dose plane corresponding to the film position. The plan was delivered with a sheet of Gafchromic EBT3 film positioned 1mm from the catheter using an Ir-192 Nucletron HDR source. The film was then digitized with an Epson 10000 XL color scanner. Film analysis is performed with MatLab imaging toolbox. A density to dose calibration curve was created using TG43 formalism for a single dwell position exposure at over 100 points for statistical accuracy. The plan and measured film dose planes were registered using a known dwell position relative to four film marks. The plan delivered 500 cGy to points 2 cm from the sources. Results: The distance to agreement of the 500 cGy isodose between the plan and film measurement laterally was 0.5 mm but can be as much as 1.5 mm superior and inferior. The difference between the computed plan dose and film measurement was calculated per pixel. The greatest errors up to 50 cGy are near the apex. Conclusion: The methodology presented will be useful to implement more comprehensive quality assurance to verify patient-specific dose distributions.« less

  1. Planning, scheduling, and control for automatic telescopes

    NASA Technical Reports Server (NTRS)

    Drummond, Mark; Swanson, Keith; Philips, Andy; Levinson, Rich; Bresina, John

    1992-01-01

    This paper presents an argument for the appropriateness of Entropy Reduction Engine (ERE) technology to the planning, scheduling, and control components of Automatic Photoelectric Telescope (APT) management. The paper is organized as follows. In the next section, we give a brief summary of the planning and scheduling requirements for APTs. Following this, in section 3, we give an ERE project precis, couched primarily in terms of project objectives. Section 4 gives a sketch of the match-up between problem and technology, and section 5 outlines where we want to go with this work.

  2. Workforce planning. Catching the drift.

    PubMed

    Jinks, C; Ong, B N; Paton, C

    1998-09-17

    NHS workforce planning has traditionally ignored the role of doctors and nurses trained in continental Europe and Scandinavia. At present doctors trained in the European Economic Area make up 10 per cent of senior house officers in England and Wales. But the numbers coming to the UK are falling. Falling medical unemployment in Europe will mean these doctors have less incentive to come to the UK, leaving a considerable gap in the NHS workforce. More local research is needed into working patterns and career plans of European-trained nurses and doctors.

  3. Developing Benchmarks for Solar Radio Bursts

    NASA Astrophysics Data System (ADS)

    Biesecker, D. A.; White, S. M.; Gopalswamy, N.; Black, C.; Domm, P.; Love, J. J.; Pierson, J.

    2016-12-01

    Solar radio bursts can interfere with radar, communication, and tracking signals. In severe cases, radio bursts can inhibit the successful use of radio communications and disrupt a wide range of systems that are reliant on Position, Navigation, and Timing services on timescales ranging from minutes to hours across wide areas on the dayside of Earth. The White House's Space Weather Action Plan has asked for solar radio burst intensity benchmarks for an event occurrence frequency of 1 in 100 years and also a theoretical maximum intensity benchmark. The solar radio benchmark team was also asked to define the wavelength/frequency bands of interest. The benchmark team developed preliminary (phase 1) benchmarks for the VHF (30-300 MHz), UHF (300-3000 MHz), GPS (1176-1602 MHz), F10.7 (2800 MHz), and Microwave (4000-20000) bands. The preliminary benchmarks were derived based on previously published work. Limitations in the published work will be addressed in phase 2 of the benchmark process. In addition, deriving theoretical maxima requires additional work, where it is even possible to, in order to meet the Action Plan objectives. In this presentation, we will present the phase 1 benchmarks and the basis used to derive them. We will also present the work that needs to be done in order to complete the final, or phase 2 benchmarks.

  4. Management of medical technology: case study of a major acute hospital.

    PubMed

    Brown, Ian; Smale, Andrew

    2007-01-01

    This paper presents results of a Capital Equipment Management Plan undertaken at a major acute hospital in Australia. By classifying existing equipment using a threshold replacement value into Major and Minor items, detailed planning information was collected for 527 items of Major equipment representing 80% of the hospital's total equipment stock. A number of meaningful views of this significant asset base are presented, and a prioritisation method used to provide recommendations for future equipment replacement and acquisition for a 5 year planning period. The survey work to identify and document actual equipment items provides a convincing argument for the funding levels required for capital equipment replacement and acquisition, and evidence for the extent of technology reliance in modern health care facilities.

  5. Lesson Plan.

    ERIC Educational Resources Information Center

    Daniel, Lois; Cochran, Martha

    1984-01-01

    Activities to help sixth graders experience Greek culture are presented. In the first activity the students learn about the mythology and work and leisure of the ancient Greeks; the second activity involves students in cooking many Greek dishes. (RM)

  6. Psychotherapeutic and work-oriented interventions: employment outcomes among young adults with work disability due to a mental disorder.

    PubMed

    Mattila-Holappa, Pauliina; Joensuu, Matti; Ahola, Kirsi; Koskinen, Aki; Tuisku, Katinka; Ervasti, Jenni; Virtanen, Marianna

    2016-01-01

    We examined the extent to which psychotherapeutic and work-oriented interventions were included in a medical treatment and rehabilitation plan and whether they predicted future employment among young adults with work disability due to a mental disorder. Data were obtained from the treatment and rehabilitation plans of 1163 young adults aged 18‒34 years, who in 2008 were granted fixed-term work disability compensation due to a mental disorder and were followed for 5 years. Forty-six percent had no proposal for psychotherapy or a work-oriented intervention in their treatment and rehabilitation plan, 22 % had a plan for only a psychotherapeutic intervention, 23 % had a plan for only a work-oriented intervention, and 10 % had both types of interventions planned. Having a planned psychotherapeutic intervention (HR = 1.35, 95 % CI 1.07-1.69) and of the work-oriented interventions, planned rehabilitative courses and training (HR = 1.34, 95 % CI 1.03-1.70) predicted quicker entry into competitive employment. Having a plan for both a psychotherapeutic and work-oriented intervention was associated with being employed at the end of the follow-up (OR = 1.77, 95 % CI 1.07-2.95). Young adults with a long-term psychiatric work disability episode rarely have a recorded plan for rehabilitation in their treatment and rehabilitation plan although psychotherapeutic interventions and a combination of a psychotherapeutic and work-oriented intervention might help them gain employment.

  7. Getting past first base: Going all the way with Cognitive Work Analysis.

    PubMed

    McIlroy, Rich C; Stanton, Neville A

    2011-01-01

    This paper reports the application of Cognitive Work Analysis (CWA) to the problem of communications planning in military aviation. Applications of CWA rarely get beyond the first one or two phases; this paper presents an analysis in which all five phases have been completed. The method offers a formative description of the system, defining the set of boundaries and constraints that shape system activity in terms of work domain, recurring activities, decision making, social organisation and worker competency requirements. It is an analysis that is well suited to environments in which the occurrence of unanticipated events can have serious implications for both safety and productivity. Communications planning in military aviation is such an environment. The outputs of the analysis provided an extensive and exhaustive description of the system, highlighting the uneven spread of activity, across actors involved in communications planning and across the situations in which planning can occur. In addition, a new method for informing worker competency requirements based on abstract functions rather than specific decision steps is proposed and discussed in terms of job design, interface design, and person specification. Copyright © 2010 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  8. 7 CFR 23.13 - Plan of Work.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... multi-State organizations or bodies for those activities of the Regional Rural Development Centers which... of the Secretary of Agriculture STATE AND REGIONAL ANNUAL PLANS OF WORK Regional Program § 23.13 Plan of Work. (a) A Regional Plan of Work for carrying out the programs authorized to be funded under...

  9. 77 FR 47373 - Fiscal Year 2012 Draft Work Plan; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-08

    ... DENALI COMMISSION Fiscal Year 2012 Draft Work Plan; Correction AGENCY: Denali Commission. ACTION... Federal Register of May 23, 2012, concerning request for comments on the Draft Work Plan for Federal Fiscal Year 2012. This revision to Fiscal Year 2012 Work Plan is to provide clarifying edits. In...

  10. 7 CFR 1710.209 - Approval requirements for load forecast work plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... cooperate in the preparation of and submittal of the load forecast work plan of their power supply borrower. (b) An approved load forecast work plan establishes the process for the preparation and maintenance... approved load forecast work plan must outline the coordination and preparation requirements for both the...

  11. Grounded in Country: Perspectives on Working within, alongside and for Aboriginal Communities

    ERIC Educational Resources Information Center

    Jackson-Barrett, Elizabeth; Price, Anne; Stomski, Norman; Walker, Bruce F.

    2015-01-01

    This paper presents the experiences of four researchers working within, alongside and for the Gumala Aboriginal Corporation in the Pilbara region of Western Australia. The focus of the research was a health and education needs analysis of Gumala Aboriginal Corporation members that would inform future education and health planning in the region.…

  12. Role of Advisory Groups. Instructor Guide. Working for Clean Water: An Information Program for Advisory Committees.

    ERIC Educational Resources Information Center

    Pennsylvania State Univ., Middletown. Inst. of State and Regional Affairs.

    Presented is an instructor's manual for conducting a learning session about public participation in water quality planning. Participants in the session learn about the purpose, organization, and activities of citizen advisory groups. The manual, a component of the Working for Clean Water Project, is designed for use in conjunction with a…

  13. Community Mental Health: Issues for Social Work Practice and Education.

    ERIC Educational Resources Information Center

    Katz, Arthur J., Ed.

    Articles by social work educators on some of the critical issues in community mental health are presented. Examined are some conceptual and program developments related to coordination, continuity of care, and the use of teams in planning and service delivery for community mental health (Lawrence K. Berg). The issue of civil commitment to and…

  14. Evaluating the Facilities Planning, Design, and Construction Department: The Capital Programs Management Audit.

    ERIC Educational Resources Information Center

    Kaiser, Harvey H.; Kirkwood, Dennis M.

    2000-01-01

    Presents a diagnostic model for assessing the state of an institution's capital programs management (CPM) by delineating "work processes" which comprise that function. What capital programs management is, its resources, and its phases and work processes are described, followed by case studies of the CPM Process Model as an assessment tool. (GR)

  15. WorkWise. A Career Awareness Course for Teen Parents. Teacher's Manual and Student Workbook.

    ERIC Educational Resources Information Center

    Garner, Barbara

    Intended for use with teen mothers, this yearlong career exploration curriculum is considered adaptable for use with any group of high school youth. The teacher's manual explains how to teach instructional units called Introduction, My Working Future, Sex Role Stereotyping, Careers, Who Am I?, Presenting Myself, Career Planning, Managing as a…

  16. The World of Barilla Taylor: Bringing History to Life through Primary Sources.

    ERIC Educational Resources Information Center

    Stearns, Liza

    1997-01-01

    Presents a lesson plan using material from a primary source-based curriculum kit titled "The World of Barilla Taylor." The kit uses personal letters, maps, hospital and work records, and other primary sources to document the life of a young woman working in the textile mills in 19th-century Massachusetts. (MJP)

  17. Investigating University Educators' Design Thinking and the Implications for Design Support Tools

    ERIC Educational Resources Information Center

    Bennett, Sue; Agostinho, Shirley; Lockyer, Lori

    2016-01-01

    All university educators perform design work as they prepare and plan learning experiences for their students. How such design work is undertaken, conceptualised, and optimally supported is the focus of ongoing research for the authors. The purpose of this article is to present the results of a research study that sought to gain a richer…

  18. Metalworking Lathe; Machine Shop Work--Intermediate: 9555.03.

    ERIC Educational Resources Information Center

    Dade County Public Schools, Miami, FL.

    The course outline has been prepared as a guide to assist the instructor to plan systematically and to present meaningful lessons to provide the training needed by the machine shop student. This is the third course of instruction in a series of machine shop work courses. The six blocks of instruction contained in this outline are designed to…

  19. The Paper Beam: Hands-On Design for Team Work Experience of Freshman in Engineering

    ERIC Educational Resources Information Center

    Kalkani, Efrossini C.; Boussiakou, Iris K.; Boussiakou, Leda G.

    2005-01-01

    The present research refers to the assigning of a hands-on group project to freshman engineering students, evaluating their performance, and deriving conclusions on student benefits and educational advances. The research procedure included action plans for the instructor and the students, instructions to the students on performing the work,…

  20. In-Service Workshop Model. Development Work, Volunteer Service and Project Review. Core Curriculum Resource Materials.

    ERIC Educational Resources Information Center

    Edwards, Dan

    A model is provided for an inservice workshop to provide systematic project review, conduct individual volunteer support and problem solving, and conduct future work planning. Information on model use and general instructions are presented. Materials are provided for 12 sessions covering a 5-day period. The first session on climate setting and…

  1. The Aging Work Force: A Guide for Higher Education Administrators.

    ERIC Educational Resources Information Center

    Julius, Nancy B., Ed.; Krauss, Herbert H., Ed.

    This volume offers 15 papers on the "graying" of the college and university work force in the context of national demographic trends. The papers are arranged in groups which address: growing older, the graying of America, adapting to changing times, retirement and retirement planning, and the corporate example. The following papers are presented:…

  2. Bench Work and Support Operations, Machine Shop Work--Intermediate: 9555.02.

    ERIC Educational Resources Information Center

    Dade County Public Schools, Miami, FL.

    The course outline has been prepared as a guide to assist the instructor to plan systematically and to present meaningful lessons programmed to meet the necessary training needed by the machine shop student who has completed an introductory course in machine tool technology. The five blocks of instruction contained in this outline are designed to…

  3. A faculty created strategic plan for excellence in nursing education.

    PubMed

    Evans, Connie Joan; Francis Shackell, Eileen; Jean Kerr-Wilson, Selma; Joan Doyle, Glynda; McCutcheon, Jodie Anita; Budz, Bernice

    2014-02-08

    Strategic planning for nursing education, when seen through a faculty lens creates a deeper, more meaningful critical analysis of effective program development. New strategies are required for academic institutions to transform their curricula to meet the needs of a dynamic healthcare and changing global environment to provide quality education for students. In this article, an evidence-informed process is presented that was progressively co-created by the faculty and facilitators. Seminal business frameworks, leadership development philosophies, and innovative interventions enabled faculty to become engaged and developed as they created a strategic plan for a future-driven nursing program. Phase One presents the process of developing a strategic plan for excellence in nursing education by leveraging faculty potential and preparing for an upcoming accreditation. In Phase Two, four team members from Phase One continue as part of Phase Two team serving as the collective memory for this initial work. This method of strategic planning encouraged faculty engagement and leadership and laid the groundwork for a positive culture change among nursing faculty.

  4. OAST Space Theme Workshop. Volume 1: Summary report. 1: Introduction. 2: General observations and some key findings. 3: Follow-on activity. Quick-look comments and working papers

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The Outlook for Space Study, consideration of National needs and OAST technology goals were factors in the selection of the following themes for candidate technical initiative and supporting program plans: space power station; search for extraterrestrial life; industrialization of space; global service station; exploration of the solar system; and advanced space transportation system. An overview is presented of the Space Theme Workshop activities in developing technology needs, program requirements, and proposed plans in support of each theme. The unedited working papers used by team members are included.

  5. A technological approach to studying motor planning ability in children at high risk for ASD.

    PubMed

    Taffoni, F; Focaroli, V; Keller, F; Iverson, J M

    2014-01-01

    In this work we propose a new method to study the development of motor planning abilities in children and, in particular, in children at high risk for ASD. Although several modified motor signs have been found in children with ASD, no specific markers enabling the early assessment of risk have been found yet. In this work, we discuss the problem posed by objective and quantitative behavioral analysis in non-structured environment. After an initial description of the main constraints imposed by the ecological approach, a technological and methodological solution to these issues is presented. Preliminary results on 12 children are reported and briefly discussed.

  6. System integration test plan for HANDI 2000 business management system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, D.

    This document presents the system integration test plan for the Commercial-Off-The-Shelf, PassPort and PeopleSoft software, and custom software created to work with the COTS products. The PP software is an integrated application for AP, Contract Management, Inventory Management, Purchasing and Material Safety Data Sheet. The PS software is an integrated application for Project Costing, General Ledger, Human Resources/Training, Payroll, and Base Benefits.

  7. Rotorcraft Master Plan

    DTIC Science & Technology

    1990-11-01

    its new format , presents a picture of a healthy industry with potential for major growth. As traffic in the airway system grows faster than the...certification criteria. Civil tiltrotor certification is highlighted. In addition, work on health and usage monitoring technology and on small, short...Offim 34 major commercial airports will be congested by CAYt 3D . , ^mrmI 1997-even if we do all that is currently planned to expand NAS capacity (see

  8. Polar Research Board annual report, 1987 and future plans

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1988-12-31

    This annual report describes the Polar Research Board, its origin and objectives, its work and plans, and its principle activities and accomplishments during calendar year 1987. The Overview presents a concise summary of the various aspects of the Board`s program and of its responsibilities as US National Committee for the Scientific Committee on Antarctic Research (SCAR) of the International Council of Scientific Unins. Arctic and Antarctic activities are described.

  9. Polar Research Board annual report, 1987 and future plans

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1988-01-01

    This annual report describes the Polar Research Board, its origin and objectives, its work and plans, and its principle activities and accomplishments during calendar year 1987. The Overview presents a concise summary of the various aspects of the Board's program and of its responsibilities as US National Committee for the Scientific Committee on Antarctic Research (SCAR) of the International Council of Scientific Unins. Arctic and Antarctic activities are described.

  10. Business planning: can the health service move from strategy into action?

    PubMed

    Bennett, A R

    1994-01-01

    Advances the case for the use of one particular business planning technique within a National Health Service Trust. At the present time, NHS trusts are required to write strategic direction statements. Evidence suggests that these documents provide an accurate account of past performance and present position of the trust, but do not express the future position intended to be achieved. These documents also tend to be lengthy and lack strategic focus, which means that they are not helpful to managers who want clear organizational goals and objectives to which to work. Attempts to address the difficulties associated with determining how existing skills and resources can be used as the platform for future growth strategies by using the Ansoff Matrix and SWOT Analysis planning tools, given the external changes in the marketplace. Also attempts to shed light on some of the important links between busines strategy and management development by extending planning theory into practice.

  11. Action Planning Mediates Guidance of Visual Attention from Working Memory.

    PubMed

    Feldmann-Wüstefeld, Tobias; Schubö, Anna

    2015-01-01

    Visual search is impaired when a salient task-irrelevant stimulus is presented together with the target. Recent research has shown that this attentional capture effect is enhanced when the salient stimulus matches working memory (WM) content, arguing in favor of attention guidance from WM. Visual attention was also shown to be closely coupled with action planning. Preparing a movement renders action-relevant perceptual dimensions more salient and thus increases search efficiency for stimuli sharing that dimension. The present study aimed at revealing common underlying mechanisms for selective attention, WM, and action planning. Participants both prepared a specific movement (grasping or pointing) and memorized a color hue. Before the movement was executed towards an object of the memorized color, a visual search task (additional singleton) was performed. Results showed that distraction from target was more pronounced when the additional singleton had a memorized color. This WM-guided attention deployment was more pronounced when participants prepared a grasping movement. We argue that preparing a grasping movement mediates attention guidance from WM content by enhancing representations of memory content that matches the distractor shape (i.e., circles), thus encouraging attentional capture by circle distractors of the memorized color. We conclude that templates for visual search, action planning, and WM compete for resources and thus cause interferences.

  12. Action Planning Mediates Guidance of Visual Attention from Working Memory

    PubMed Central

    Schubö, Anna

    2015-01-01

    Visual search is impaired when a salient task-irrelevant stimulus is presented together with the target. Recent research has shown that this attentional capture effect is enhanced when the salient stimulus matches working memory (WM) content, arguing in favor of attention guidance from WM. Visual attention was also shown to be closely coupled with action planning. Preparing a movement renders action-relevant perceptual dimensions more salient and thus increases search efficiency for stimuli sharing that dimension. The present study aimed at revealing common underlying mechanisms for selective attention, WM, and action planning. Participants both prepared a specific movement (grasping or pointing) and memorized a color hue. Before the movement was executed towards an object of the memorized color, a visual search task (additional singleton) was performed. Results showed that distraction from target was more pronounced when the additional singleton had a memorized color. This WM-guided attention deployment was more pronounced when participants prepared a grasping movement. We argue that preparing a grasping movement mediates attention guidance from WM content by enhancing representations of memory content that matches the distractor shape (i.e., circles), thus encouraging attentional capture by circle distractors of the memorized color. We conclude that templates for visual search, action planning, and WM compete for resources and thus cause interferences. PMID:26171241

  13. Aligning the honors program with AGU's mission

    NASA Astrophysics Data System (ADS)

    Fine, Rana A.; Paredes, Elizabeth

    2012-08-01

    Over the past 2 years, AGU's Honors and Recognition (H&R) Committee (http://www.agu.org/about/governance/committees_boards/honors-recog.shtml) has been working to better align the Union medals, awards, and prizes with AGU's new vision, core values, and strategic plan. The changes described below have been approved by the AGU Council. The H&R Committee reviewed and evaluated its charge to see how it can be aligned to better support AGU's strategic plan (http://www.agu.org/about/strategic_plan.shtml). The committee formally defined medals, awards, and prizes. Medals are given for a scientific body of work in Earth and space sciences. Awards are related to science, society, and talent pool goals. Prizes are presented jointly by AGU and some other nonprofit, for-profit, government, and/or nongovernmental entities and involve significant funding.

  14. The U.S. National Action Plan to Improve Health Literacy: A Model for Positive Organizational Change.

    PubMed

    Baur, Cynthia; Harris, Linda; Squire, Elizabeth

    2017-01-01

    This chapter presents the U.S. National Action Plan to Improve Health Literacy and its unique contribution to public health and health care in the U.S. The chapter details what the National Action Plan is, how it evolved, and how it has influenced priorities for health literacy improvement work. Examples of how the National Action Plan fills policy and research gaps in health care and public health are included. The first part of the chapter lays the foundation for the development of the National Action Plan, and the second part discusses how it can stimulate positive organizational change to help create health literate organizations and move the nation towards a health literate society.

  15. Remedial Investigation Work Plan for Upper East Fork Poplar Creek Operable Unit 3 at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-08-01

    Upper East Fork Popular Creek Operable Unit 3 (UEFPC OU 3) is a source term OU composed of seven sites, and is located in the western portion of the Y-12 Plant. For the most part, the UEFPC OU 3 sites served unrelated purposes and are geographically removed from one another. The seven sites include the following: Building 81-10, the S-2 Site, Salvage Yard oil storage tanks, the Salvage Yard oil/solvent drum storage area, Tank Site 2063-U, the Salvage Yard drum deheader, and the Salvage Yard scrap metal storage area. All of these sites are contaminated with at least one ormore » more hazardous and/or radioactive chemicals. All sites have had some previous investigation under the Y-12 Plant RCRA Program. The work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to each OU 3 site. The potential for release of contaminants to receptors through various media is addressed, and a sampling and analysis plan is presented to obtain objectives for the remedial investigation. Proposed sampling activities are contingent upon the screening level risk assessment, which includes shallow soil sampling, soil borings, monitoring well installation, groundwater sampling, and surface water sampling. Data from the site characterization activities will be used to meet the above objectives. A Field Sampling Investigation Plan, Health and Safety Plan, and Waste Management Plan are also included in this work plan.« less

  16. Orbital Express mission operations planning and resource management using ASPEN

    NASA Astrophysics Data System (ADS)

    Chouinard, Caroline; Knight, Russell; Jones, Grailing; Tran, Daniel

    2008-04-01

    As satellite equipment and mission operations become more costly, the drive to keep working equipment running with less labor-power rises. Demonstrating the feasibility of autonomous satellite servicing was the main goal behind the Orbital Express (OE) mission. Like a tow-truck delivering gas to a car on the road, the "servicing" satellite of OE had to find the "client" from several kilometers away, connect directly to the client, and transfer fluid (or a battery) autonomously, while on earth-orbit. The mission met 100% of its success criteria, and proved that autonomous satellite servicing is now a reality for space operations. Planning the satellite mission operations for OE required the ability to create a plan which could be executed autonomously over variable conditions. As the constraints for execution could change weekly, daily, and even hourly, the tools used create the mission execution plans needed to be flexible and adaptable to many different kinds of changes. At the same time, the hard constraints of the plans needed to be maintained and satisfied. The Automated Scheduling and Planning Environment (ASPEN) tool, developed at the Jet Propulsion Laboratory, was used to create the schedule of events in each daily plan for the two satellites of the OE mission. This paper presents an introduction to the ASPEN tool, an overview of the constraints of the OE domain, the variable conditions that were presented within the mission, and the solution to operations that ASPEN provided. ASPEN has been used in several other domains, including research rovers, Deep Space Network scheduling research, and in flight operations for the NASA's Earth Observing One mission's EO1 satellite. Related work is discussed, as are the future of ASPEN and the future of autonomous satellite servicing.

  17. ABA Southern Region Burn disaster plan: the process of creating and experience with the ABA southern region burn disaster plan.

    PubMed

    Kearns, Randy D; Cairns, Bruce A; Hickerson, William L; Holmes, James H

    2014-01-01

    The Southern Region of the American Burn Association began to craft a regional plan to address a surge of burn-injured patients after a mass casualty event in 2004. Published in 2006, this plan has been tested through modeling, exercise, and actual events. This article focuses on the process of how the plan was created, how it was tested, and how it interfaces with other ongoing efforts on preparedness. One key to success regarding how people respond to a disaster can be traced to preexisting relationships and collaborations. These activities would include training or working together and building trust long before the crisis. Knowing who you can call and rely on when you need help, within the context of your plan, can be pivotal in successfully managing a disaster. This article describes how a coalition of burn center leaders came together. Their ongoing personal association has facilitated the development of planning activities and has kept the process dynamic. This article also includes several of the building blocks for developing a plan from creation to composition, implementation, and testing. The plan discussed here is an example of linking leadership, relationships, process, and documentation together. On the basis of these experiences, the authors believe these elements are present in other regions. The intent of this work is to share an experience and to offer it as a guide to aid others in their regional burn disaster planning efforts.

  18. Effect of noise on comfort in open-plan offices: application of an assessment questionnaire.

    PubMed

    Perrin Jegen, N; Chevret, P

    2017-01-01

    Open-plan offices account for 60% of French office workspaces. The noise levels recorded in this type of environment are much lower than those encountered in industrial workplaces. Nevertheless, surveys show that noise is considered by employees as the main source of discomfort. A first questionnaire dedicated to noise discomfort was produced in 2013 and tested on a panel made up of 217 people working in 7 French companies. Today, it also makes it possible to address the issues of fatigue related to ambient sound, but above all, the survey aims to study the differences in how ambient noise is perceived depending on the type of open-plan office. On the basis of that new version, a second survey has been conducted in 23 open-plan offices, making it possible to collect the responses from 617 employees. Most of the results of the first survey have been confirmed, with an increase in the significance of the statistical analyses. Moreover, French Standard NF S 31-199, which is currently being drafted, establishes a typology of open-plan office spaces according to the types of work done in them. Based on this typology, it appears that when dealing with the impact on noise on workers, a distinction has to be made between the types of open plan offices. Practitioner Summary: Surveys conducted in open-plan offices show that noise is considered by employees as the main source of discomfort even if the noise recorded in this type of environment is not hazardous. This work presents the result of a large survey dedicated to noise discomfort conducted in 23 open-plan offices.

  19. Fuzzy linear model for production optimization of mining systems with multiple entities

    NASA Astrophysics Data System (ADS)

    Vujic, Slobodan; Benovic, Tomo; Miljanovic, Igor; Hudej, Marjan; Milutinovic, Aleksandar; Pavlovic, Petar

    2011-12-01

    Planning and production optimization within multiple mines or several work sites (entities) mining systems by using fuzzy linear programming (LP) was studied. LP is the most commonly used operations research methods in mining engineering. After the introductory review of properties and limitations of applying LP, short reviews of the general settings of deterministic and fuzzy LP models are presented. With the purpose of comparative analysis, the application of both LP models is presented using the example of the Bauxite Basin Niksic with five mines. After the assessment, LP is an efficient mathematical modeling tool in production planning and solving many other single-criteria optimization problems of mining engineering. After the comparison of advantages and deficiencies of both deterministic and fuzzy LP models, the conclusion presents benefits of the fuzzy LP model but is also stating that seeking the optimal plan of production means to accomplish the overall analysis that will encompass the LP model approaches.

  20. Supersonics--Airport Noise

    NASA Technical Reports Server (NTRS)

    Bridges, James

    2007-01-01

    At this, the first year-end meeting of the Fundamental Aeronautics Program, an overview of the Airport Noise discipline of the Supersonics Project leads the presentation of technical plans and achievements in this area of the Project. The overview starts by defining the Technical Challenges targeted by Airport Noise efforts, and the Approaches planned to meet these challenges. These are fleshed out in Elements, namely Prediction, Diagnostics, and Engineering, and broken down into Tasks. The Tasks level is where individual researchers' work is defined and from whence the technical presentations to follow this presentation come. This overview also presents the Milestones accomplished to date and to be completed in the next year. Finally, the NASA Research Announcement cooperative agreement activities are covered and tied to the Tasks and Milestones.

  1. Training telescope operators and support astronomers at Paranal

    NASA Astrophysics Data System (ADS)

    Boffin, Henri M. J.; Gadotti, Dimitri A.; Anderson, Joe; Pino, Andres; de Wit, Willem-Jan; Girard, Julien H. V.

    2016-07-01

    The operations model of the Paranal Observatory relies on the work of efficient staff to carry out all the daytime and nighttime tasks. This is highly dependent on adequate training. The Paranal Science Operations department (PSO) has a training group that devises a well-defined and continuously evolving training plan for new staff, in addition to broadening and reinforcing courses for the whole department. This paper presents the training activities for and by PSO, including recent astronomical and quality control training for operators, as well as adaptive optics and interferometry training of all staff. We also present some future plans.

  2. Investigation into avian mortality in the Playa Lakes region of southeastern New Mexico: Final Report - June 1997

    USGS Publications Warehouse

    Dein, F. Joshua; Baeten, Laurie A.; Moore, Melody K.; Samuel, Michael D.; Miller, Paul D.; Murphy, Christopher; Sissler, Steven; Jeske, Clinton W.; Jehl, Joseph R.; Yaeger, J. S.; Bauer, B.; Mahoney, Shiela A.

    1997-01-01

    This Final Report is a review of work on a cooperative study undertaken by the USGS Biological Resources Division's National Wildlife Health Center (NWHC) and National Wetlands Research Center (NWRC; formerly the Southern Science Center) from 1994 through 1997. The study was initiated at the request of the Bureau of Land Management (BLM), through a request to the former National Biological Service. The Southeastern New Mexico Playa Lakes Coordinating Committee (SENMPLCC) played an important role in outlining the research needs. The initial Study Plan document, which outlines the background, objectives and methods for the first two years is available as Appendix 1. A letter indicating modifications to the Study Plan was sent to the SENMPLCC chair on April 25,1995, and is Appendix 2. An Interim Report, covering this work was completed and submitted in September 1995. The Literature Review section of the study was completed and presented to SENMPLCC in August, 1995. Following SENMPLCC review, NWHC was asked to develop a series of questions that could be posed from information gained in the initial phase (Appendix 3). The NWHC and NWRC were then directed to begin work to answer the top three questions, within the available fiscal resources. NWRC could continue with work outlined under the original Study Plan (Appendix 1), however an additional Study Plan for experiments performed by NWHC and collaborators and is available as Appendix 4.

  3. Recovering from execution errors in SIPE

    NASA Technical Reports Server (NTRS)

    Wilkins, D. E.

    1987-01-01

    In real-world domains (e.g., a mobile robot environment), things do not always proceed as planned, so it is important to develop better execution-monitoring techniques and replanning capabilities. These capabilities in the SIPE planning system are described. The motivation behind SIPE is to place enough limitations on the representation so that planning can be done efficiently, while retaining sufficient power to still be useful. This work assumes that new information given to the execution monitor is in the form of predicates, thus avoiding the difficult problem of how to generate these predicates from information provided by sensors. The replanning module presented here takes advantage of the rich structure of SIPE plans and is intimately connected with the planner, which can be called as a subroutine. This allows the use of SIPE's capabilities to determine efficiently how unexpected events affect the plan being executed and, in many cases, to retain most of the original plan by making changes in it to avoid problems caused by these unexpected events. SIPE is also capable of shortening the original plan when serendipitous events occur. A general set of replanning actions is presented along with a general replanning capability that has been implemented by using these actions.

  4. Open Distant Learning: Pedagogical Terms of Reference and Dilemmas

    ERIC Educational Resources Information Center

    Tatkovic, Nevenka; Ruzic, Maja; Tatkovic, Sanja

    2006-01-01

    The paper first presents the essential viewpoints of general characteristics of open distance learning (OLD) and the short historical origins. The second part presents some pedagogical terms of reference for Open distance learning as the quality of ODL, the criteria of successful ODL (planning, successful interaction, work and emotional climate,…

  5. FY 1986 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less

  6. Implementing Earned Value Management in the CxP EVA Systems Project Office

    NASA Technical Reports Server (NTRS)

    Sorge, Les L.

    2009-01-01

    Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.

  7. Using computer software to improve group decision-making.

    PubMed

    Mockler, R J; Dologite, D G

    1991-08-01

    This article provides a review of some of the work done in the area of knowledge-based systems for strategic planning. Since 1985, with the founding of the Center for Knowledge-based Systems for Business Management, the project has focused on developing knowledge-based systems (KBS) based on these models. In addition, the project also involves developing a variety of computer and non-computer methods and techniques for assisting both technical and non-technical managers and individuals to do decision modelling and KBS development. This paper presents a summary of one segment of the project: a description of integrative groupware useful in strategic planning. The work described here is part of an ongoing research project. As part of this project, for example, over 200 non-technical and technical business managers, most of them working full-time during the project, developed over 160 KBS prototype systems in conjunction with MBA course in strategic planning and management decision making. Based on replies to a survey of this test group, 28 per cent of the survey respondents reported their KBS were used at work, 21 per cent reportedly received promotions, pay rises or new jobs based on their KBS development work, and 12 per cent reported their work led to participation in other KBS development projects at work. All but two of the survey respondents reported that their work on the KBS development project led to a substantial increase in their job knowledge or performance.

  8. PlanWorks: A Debugging Environment for Constraint Based Planning Systems

    NASA Technical Reports Server (NTRS)

    Daley, Patrick; Frank, Jeremy; Iatauro, Michael; McGann, Conor; Taylor, Will

    2005-01-01

    Numerous planning and scheduling systems employ underlying constraint reasoning systems. Debugging such systems involves the search for errors in model rules, constraint reasoning algorithms, search heuristics, and the problem instance (initial state and goals). In order to effectively find such problems, users must see why each state or action is in a plan by tracking causal chains back to part of the initial problem instance. They must be able to visualize complex relationships among many different entities and distinguish between those entities easily. For example, a variable can be in the scope of several constraints, as well as part of a state or activity in a plan; the activity can arise as a consequence of another activity and a model rule. Finally, they must be able to track each logical inference made during planning. We have developed PlanWorks, a comprehensive system for debugging constraint-based planning and scheduling systems. PlanWorks assumes a strong transaction model of the entire planning process, including adding and removing parts of the constraint network, variable assignment, and constraint propagation. A planner logs all transactions to a relational database that is tailored to support queries for of specialized views to display different forms of data (e.g. constraints, activities, resources, and causal links). PlanWorks was specifically developed for the Extensible Universal Remote Operations Planning Architecture (EUROPA(sub 2)) developed at NASA, but the underlying principles behind PlanWorks make it useful for many constraint-based planning systems. The paper is organized as follows. We first describe some fundamentals of EUROPA(sub 2). We then describe PlanWorks' principal components. We then discuss each component in detail, and then describe inter-component navigation features. We close with a discussion of how PlanWorks is used to find model flaws.

  9. Impact of Job Design Problems and Lack of Support. Draft Version. Working Paper #6.

    ERIC Educational Resources Information Center

    Gersten, Russell; And Others

    This paper presents implications of the path analysis procedures used to interpret data from a study of urban special education teachers' perceptions of working conditions. The analysis looked at a broad range of factors that could affect teacher plans to leave the field. An overall finding emerging from the analysis was that the same fundamental…

  10. Corporate Supports for the Family Lives of Employees: A Conceptual Model for Program Planning and Evaluation.

    ERIC Educational Resources Information Center

    Bowen, Gary L.

    1988-01-01

    Presents a conceptual model depicting the effects of family-oriented benefits, policies, and services in the corporate sector, on employees' work and family lives. Discusses the model in the context of the historical development of, and recent expansions in, corporate supports for employees and their families, and the need for a work-family model…

  11. Development and Testing of Geo-Processing Models for the Automatic Generation of Remediation Plan and Navigation Data to Use in Industrial Disaster Remediation

    NASA Astrophysics Data System (ADS)

    Lucas, G.; Lénárt, C.; Solymosi, J.

    2015-08-01

    This paper introduces research done on the automatic preparation of remediation plans and navigation data for the precise guidance of heavy machinery in clean-up work after an industrial disaster. The input test data consists of a pollution extent shapefile derived from the processing of hyperspectral aerial survey data from the Kolontár red mud disaster. Three algorithms were developed and the respective scripts were written in Python. The first model aims at drawing a parcel clean-up plan. The model tests four different parcel orientations (0, 90, 45 and 135 degree) and keeps the plan where clean-up parcels are less numerous considering it is an optimal spatial configuration. The second model drifts the clean-up parcel of a work plan both vertically and horizontally following a grid pattern with sampling distance of a fifth of a parcel width and keep the most optimal drifted version; here also with the belief to reduce the final number of parcel features. The last model aims at drawing a navigation line in the middle of each clean-up parcel. The models work efficiently and achieve automatic optimized plan generation (parcels and navigation lines). Applying the first model we demonstrated that depending on the size and geometry of the features of the contaminated area layer, the number of clean-up parcels generated by the model varies in a range of 4% to 38% from plan to plan. Such a significant variation with the resulting feature numbers shows that the optimal orientation identification can result in saving work, time and money in remediation. The various tests demonstrated that the model gains efficiency when 1/ the individual features of contaminated area present a significant orientation with their geometry (features are long), 2/ the size of pollution extent features becomes closer to the size of the parcels (scale effect). The second model shows only 1% difference with the variation of feature number; so this last is less interesting for planning optimization applications. Last model rather simply fulfils the task it was designed for by drawing navigation lines.

  12. An Example of Planning/Management Reports Produced at Delaware County Community College in Conjunction with American Management Association (AMA) Processes and National Center for Education Management Systems (NCHEMS) Products.

    ERIC Educational Resources Information Center

    Spencer, Richard L.; And Others

    Within this document, and presented in their entirety, are five reports which depict differing views of Delaware County Community College (DCCC) from 1974 through 1980. The reports consist of both historical and predictive data, evolved from staff work related to long and short range planning. The general framework for this activity revolved about…

  13. A knowledge representation of local pandemic influenza planning models.

    PubMed

    Islam, Runa; Brandeau, Margaret L; Das, Amar K

    2007-10-11

    Planning for pandemic flu outbreak at the small-government level can be aided through the use of mathematical policy models. Formulating and analyzing policy models, however, can be a time- and expertise-expensive process. We believe that a knowledge-based system for facilitating the instantiation of locale- and problem-specific policy models can reduce some of these costs. In this work, we present the ontology we have developed for pandemic influenza policy models.

  14. Focus on Customer Service. Service Management: How to Plan for it Rather Than Hope for It [and] Learning to Say "Yes": A Customer Service Program for Library Staff [and] Maintaining Momentum in a Quality Improvement Process.

    ERIC Educational Resources Information Center

    Brewer, Julie; And Others

    1995-01-01

    Presents three articles that discuss customer service in libraries, with a focus on planning for service management, a customer service program for library staff, and a quality improvement process. Highlights include developing and implementing service strategies, dealing with requests, redefining work relationships, coworkers as customers,…

  15. The evolution of an evaluation: a case study using the tribal participatory research model.

    PubMed

    Richmond, Lucinda S; Peterson, Donna J; Betts, Sherry C

    2008-10-01

    This article presents a case study of how the evaluation design for a dating violence prevention and/or youth development program for American Indian youth in Arizona evolved throughout the project. Particular attention is given to how the evaluation design was guided by the tribal participatory research model. A brief rationale for the project is presented along with literature on culturally competent evaluation and research with American Indians. A description of the project and the unique communities in which it was implemented is provided. The focus of the article is the process of how the evaluation plan changed and how various factors influenced this process (e.g., feedback from community stakeholders, conversations with funder, results of process evaluation, suggestions from literature, the authors' experience working in American Indian communities). The authors conclude with lessons learned for others to consider as they develop working relationships and evaluation plans in similar communities.

  16. Impact of the 1985 Space World Administrative Radio Conference on frequency/orbit planning and use

    NASA Technical Reports Server (NTRS)

    Miller, E. F.

    1986-01-01

    The 1985 World Administrative Radio Conference (WARC-ORB-85) was held to determine which space radio services should be planned and which planning methods should be used. The second session of this Conference (WARC-ORB-88) will meet to develop the required plans. This paper presents the results of WARC-ORB-85, assesses the impact of those decisions, and identifies the intersessional work to be conducted by administrations and the CCIR (Consultative Committee on International Radio). The major decisions of WARC-ORB-85 were: (1) the restriction of additional planning to the fixed satellite service at identified frequencies; and (2) the selection of a planning method consisting of two parts (a) an allotment plan, and (b) improved procedures. The paper also discusses WARC-ORB-85 decisions relative to the Region 2 broadcast satellite service plans at 12 GHz, feederlink planning for Regions 1 and 3 broadcast satellites at 12 GHz, and sound broadcast satellite service.

  17. Present investigations of radioactive raw materials by the Geological Survey and a recommended program for future work

    USGS Publications Warehouse

    Butler, A.P.; Stead, F.W.

    1947-01-01

    The Geological Survey's program of investigation of radioactive raw materials is presented herewith under present investigations, plans for future investigations, plan of operation, and cost of operation. This report was prepared at the request of the Atomic Energy Commission. Present investigations are summarized to show the scope of the present Trace Elements program, grouping individual projects into related types of investigations. Plans for future investigations on an expanded scale are outlined. These should provide sufficient data and knowledge of the occurrence and availability of uranium, thorium, and related elements, to permit a more complete evaluation of domestic resources. Reconnaissance projects are designed to discover possible new sources of uranium and thorium and to select areas and materials warranting further investigation. Typical projects leading to the estimation of reserves are the investigation of the carnotite ores of the Colorado Plateau by geologic mapping, exploratory drilling, and related research, and investigation of asphaltic sandstone in Emery County, Utah. Extensive research will be undertaken to establish the principles governing the geological and geochemical relations of uranium, thorium, and associated elements as an essential guide in appraising domestic resources. Particular emphasis will be placed on phosphatic rocks and black shales which offer ultimate resources of uranium far greater than carnotite ores. All the foregoing investigations will be accompanied by chemical, gephysical, and mineralogical research and analytical work. Under plan of operation is discussed the organization of the Trace Elements Unit, space requirements for laboratory and office, the scheduling of investigations, and other related problems. The proposed scheduling of work calls for approximately 109, 173, and 203 man years in fiscal years 1948, 1949, and 1950 respectively. Definite plans have been formulated only for the next three fiscal years, by which time it is assumed the program will reach stable proportions or can be altered as experience dictates. Under cost of operation is set forth the funds available in fiscal year 1947, the status of funds transferred from Atomic Services (14-217/80920), and funds necessary in succeeding fiscal years. The estimate for fiscal year 1948 inclues a non-recurring item of $1,025,000 for establishing adequate laboratories for chemical, physical, spectrographic and mineralogic research and analytical work. The total funds required in fiscal years 1948, 1949, and 1950 to support the proposed program will be $2,440,000, $2,161,000 and $2,198,000 respectively. The Geological survey anticipates contributing from its appropriation in fiscal years 1948, 1949 and 1950 approximately $243,000, $350,000, and $400,000 respectively; the balance of the necessary funds to be contributed by the Atomic Energy Commission in fiscal years 1948, 1949, and 1950 will be approximately $2,196,900, $1,811,000, and $1,798,000 respectively.

  18. Three-dimensional planning in craniomaxillofacial surgery

    PubMed Central

    Rubio-Palau, Josep; Prieto-Gundin, Alejandra; Cazalla, Asteria Albert; Serrano, Miguel Bejarano; Fructuoso, Gemma Garcia; Ferrandis, Francisco Parri; Baró, Alejandro Rivera

    2016-01-01

    Introduction: Three-dimensional (3D) planning in oral and maxillofacial surgery has become a standard in the planification of a variety of conditions such as dental implants and orthognathic surgery. By using custom-made cutting and positioning guides, the virtual surgery is exported to the operating room, increasing precision and improving results. Materials and Methods: We present our experience in the treatment of craniofacial deformities with 3D planning. Software to plan the different procedures has been selected for each case, depending on the procedure (Nobel Clinician, Kodak 3DS, Simplant O&O, Dolphin 3D, Timeus, Mimics and 3-Matic). The treatment protocol is exposed step by step from virtual planning, design, and printing of the cutting and positioning guides to patients’ outcomes. Conclusions: 3D planning reduces the surgical time and allows predicting possible difficulties and complications. On the other hand, it increases preoperative planning time and needs a learning curve. The only drawback is the cost of the procedure. At present, the additional preoperative work can be justified because of surgical time reduction and more predictable results. In the future, the cost and time investment will be reduced. 3D planning is here to stay. It is already a fact in craniofacial surgery and the investment is completely justified by the risk reduction and precise results. PMID:28299272

  19. Three-dimensional planning in craniomaxillofacial surgery.

    PubMed

    Rubio-Palau, Josep; Prieto-Gundin, Alejandra; Cazalla, Asteria Albert; Serrano, Miguel Bejarano; Fructuoso, Gemma Garcia; Ferrandis, Francisco Parri; Baró, Alejandro Rivera

    2016-01-01

    Three-dimensional (3D) planning in oral and maxillofacial surgery has become a standard in the planification of a variety of conditions such as dental implants and orthognathic surgery. By using custom-made cutting and positioning guides, the virtual surgery is exported to the operating room, increasing precision and improving results. We present our experience in the treatment of craniofacial deformities with 3D planning. Software to plan the different procedures has been selected for each case, depending on the procedure (Nobel Clinician, Kodak 3DS, Simplant O&O, Dolphin 3D, Timeus, Mimics and 3-Matic). The treatment protocol is exposed step by step from virtual planning, design, and printing of the cutting and positioning guides to patients' outcomes. 3D planning reduces the surgical time and allows predicting possible difficulties and complications. On the other hand, it increases preoperative planning time and needs a learning curve. The only drawback is the cost of the procedure. At present, the additional preoperative work can be justified because of surgical time reduction and more predictable results. In the future, the cost and time investment will be reduced. 3D planning is here to stay. It is already a fact in craniofacial surgery and the investment is completely justified by the risk reduction and precise results.

  20. AI-MSG modification work plan. [LMFBR

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Page, J.P.

    1973-08-20

    This document contains the Work Plan for the modification of the AI Steam Generator for tests in Large Leak Test Rig. This Work Plan describes the objectives, scope of work, schedule and manpower, end items, and meetings and reports required for the modification.

  1. Railroad system of Texas: A component of the state and national transportation infrastructure. Research report, September 1996--November 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roop, S.S.; Warner, J.E.; Rosa, D.

    1998-11-01

    Railroads continue to play an important role in the Texas transportation system. This study addresses the potential for implementing a rail planning process in the Texas Department of Transportation. The study is documented in three reports, produced in coordinated and parallel efforts by the Center for Transportation Research and the Texas Transportation Institute. This report documents the work performed by TTI, whereby a rail planning framework is presented which formalizes the planning process and presents the key elements as a series of discrete and logical steps. These steps may be used to guide TxDOT in the formation of goals, identificationmore » of issues and affected parties, selection of appropriate analytical methodologies, location of data sources, and implementation of results. The report also presents an in-depth discussion of several key issues facing transportation agencies. These include rail line abandonment, intermodal service planning, and urban rail rationalization. A discussion of the Texas rail system covers the Class 1 railroads, shortline railroads, Amtrak, and the Mexican rail system.« less

  2. Geotechnical support and topical studies for nuclear waste geologic repositories

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1989-01-01

    The present report lists the technical reviews and comments made during the fiscal year 1988 and summarizes the technical progress of the topical studies. In the area of technical assistance, there were numerous activities detailed in the next section. These included 24 geotechnical support activities, including reviews of 6 Study Plans (SP) and participation in 6 SP Review Workshops, review of one whole document Site Characterization Plan (SCP) and participation in the Assembled Document SCP Review Workshops by 6 LBL reviewers; the hosting of a DOE program review, the rewriting of the project statement of work, 2 trips to technicalmore » and planning meetings; preparation of proposed work statements for two new topics for DOE, and 5 instances of technical assistance to DOE. These activities are described in a Table in the following section entitled Geoscience Technical Support for Nuclear Waste Geologic Repositories.''« less

  3. Electric Motors Maintenance Planning From Its Operating Variables

    NASA Astrophysics Data System (ADS)

    Rodrigues, Francisco; Fonseca, Inácio; Farinha, José Torres; Ferreira, Luís; Galar, Diego

    2017-09-01

    The maintenance planning corresponds to an approach that seeks to maximize the availability of equipment and, consequently, increase the levels of competitiveness of companies by increasing production times. This paper presents a maintenance planning based on operating variables (number of hours worked, duty cycles, number of revolutions) to maximizing the availability of operation of electrical motors. The reading of the operating variables and its sampling is done based on predetermined sampling cycles and subsequently is made the data analysis through time series algorithms aiming to launch work orders before reaching the variables limit values. This approach is supported by tools and technologies such as logical applications that enable a graphical user interface for access to relevant information about their Physical Asset HMI (Human Machine Interface), including the control and supervision by acquisition through SCADA (Supervisory Control And data acquisition) data, also including the communication protocols among different logical applications.

  4. Revealing Risks in Adaptation Planning: expanding Uncertainty Treatment and dealing with Large Projection Ensembles during Planning Scenario development

    NASA Astrophysics Data System (ADS)

    Brekke, L. D.; Clark, M. P.; Gutmann, E. D.; Wood, A.; Mizukami, N.; Mendoza, P. A.; Rasmussen, R.; Ikeda, K.; Pruitt, T.; Arnold, J. R.; Rajagopalan, B.

    2015-12-01

    Adaptation planning assessments often rely on single methods for climate projection downscaling and hydrologic analysis, do not reveal uncertainties from associated method choices, and thus likely produce overly confident decision-support information. Recent work by the authors has highlighted this issue by identifying strengths and weaknesses of widely applied methods for downscaling climate projections and assessing hydrologic impacts. This work has shown that many of the methodological choices made can alter the magnitude, and even the sign of the climate change signal. Such results motivate consideration of both sources of method uncertainty within an impacts assessment. Consequently, the authors have pursued development of improved downscaling techniques spanning a range of method classes (quasi-dynamical and circulation-based statistical methods) and developed approaches to better account for hydrologic analysis uncertainty (multi-model; regional parameter estimation under forcing uncertainty). This presentation summarizes progress in the development of these methods, as well as implications of pursuing these developments. First, having access to these methods creates an opportunity to better reveal impacts uncertainty through multi-method ensembles, expanding on present-practice ensembles which are often based only on emissions scenarios and GCM choices. Second, such expansion of uncertainty treatment combined with an ever-expanding wealth of global climate projection information creates a challenge of how to use such a large ensemble for local adaptation planning. To address this challenge, the authors are evaluating methods for ensemble selection (considering the principles of fidelity, diversity and sensitivity) that is compatible with present-practice approaches for abstracting change scenarios from any "ensemble of opportunity". Early examples from this development will also be presented.

  5. [Exploring the prospects for general practitioners over 55 years old from three counties of western France].

    PubMed

    Robino, Stéphane; Buis, Hélène; Delansorne, Fanny; Tomas, Josiane; Huez, Jean-François; La Combe, Antoine; Fanello, Serge

    2009-01-01

    Medical demography and the practice of medicine will be influenced by the personal plans of GPs and their decisions to stop practicing in the coming years. This study aims to understand the events that could potentially worsen the medical demography in terms of shortages of GPs for primary care in the short term. 455 GPs (all aged over 55 years) practicing in three districts of western France were selected to participate in this prospective study. 258 valid and complete questionnaires (56%) were received. With the use of a special programme, SPSS version 1.5, an overall comprehensive analysis and one by geographical sub-regional groups were performed. When queried about their plans or wishes for their practice between the present time and their age of 65, of the responding physicians, 27% wanted to continue working under the same conditions, 10% were undecided, and 63% wanted to stop or adjust their professional activity before age 65. The main reasons and factors motivating these plans were their current time constraints, the workload related to administrative tasks and the continuity of care; moreover, GPs noted the demands and expectations of patients, professional burnout and difficulties in obtaining a healthy work-life balance as factors contributing to these plans. Physicians who wanted to stop practicing (30%) were the least satisfied with their work and seem to have anticipated this plan of action given that they reduced their number of hours in the office and on-call. Those who wish to adapt their work time (33%) are for the most part satisfied even if they work more, but 70% want to reduce their work hours. The impact of these projects is a potentially heavy one, especially since two of the counties concerned have a low medical density and high rate of practicing physicians. Government measures currently proposed do not seem to respond to the evolution of private practice expected by GPs over 55 years.

  6. CTH Implementation of a Two-Phase Material Model With Strength: Application to Porous Materials

    DTIC Science & Technology

    2012-07-01

    he worked in the Lavrentyev Institute of Hydrodynamics (Russian Academy of Science) in the area of constitutive modelling for problems of high...velocity impact. Anatoly obtained a PhD in Physics and Mathematics from the Institute of Hydrodynamics in 1985. In 1996-1998 he worked in a private...silica in the present consideration. Further work is planned to account for a phase transition using the three-phase modelling approach [1]. In the

  7. JPRS Report, Arms Control

    DTIC Science & Technology

    1989-01-19

    more faster and practical work . Accord- ingly, they consented to hold the next consultation January 2. GERMAN DEMOCRATIC REPUBLIC FRG SPD’s Bahr on...1989 EAST EUROPE question is justified in as much as there are powerful opposing forces at work that have by no means given up yet. What is clear...is ready to work out and present, on the basis of its own experience, plans for such a conver- sion, and let international society judge them. This

  8. Climate Change and Water Working Group - User Needs to Manage Hydrclimatic Risk from Days to Decades

    NASA Astrophysics Data System (ADS)

    Raff, D. A.; Brekke, L. D.; Werner, K.; Wood, A.; White, K. D.

    2012-12-01

    The Federal Climate Change Water Working Group (CCAWWG) provides engineering and scientific collaborations in support of water management. CCAWWG objectives include building working relationships across federal science and water management agencies, provide a forum to share expertise and leverage resources, develop education and training forums, to work with water managers to understand scientific needs and to foster collaborative efforts across the Federal and non-Federal water management and science communities to address those needs. Identifying and addressing water management needs has been categorized across two major time scales: days to a decade and multi-decadal, respectively. These two time periods are termed "Short-Term" and "Long-Term" in terms of the types of water management decisions they support where Short-Term roughly correlates to water management operations and Long-Term roughly correlates to planning activities. This presentation will focus on portraying the identified water management user needs across these two time periods. User Needs for Long-Term planning were identified in the 2011 Reclamation and USACE "Addressing Climate Change in Long-Term Water Resources Planning and Management: User Needs for Improving Tools and Information." User needs for Long-Term planning are identified across eight major categories: Summarize Relevant Literature, Obtain Climate Change Information, Make Decisions About How to Use the Climate Change Information, Assess Natural Systems Response, Assess Socioeconomic and Institutional Response, Assess System Risks and Evaluate Alternatives, Assess and Characterize Uncertainties, and Communicating Results and Uncertainties to Decisionmakers. User Needs for Short-Term operations are focused on needs relative to available or desired monitoring and forecast products from the hydroclimatic community. These needs are presenting in the 2012 USACE, Reclamation, and NOAA - NWS "Short-Term Water Management Decisions: User Needs for Improved Climate, Weather, and Hydrologic Information." Identified needs are presented in four categories: Monitoring, Forecasting, Understanding on Product Relationships and Utilization in Water Management, and Information Services Enterprise. These needs represent everything from continuation and enhancement of in situ monitoring products such as USGS water gages and precipitation networks to supporting product maintenance and evolution to accommodate newly developed technologies.

  9. First down and goal to go. [Washington State resource applications for LANDSAT data

    NASA Technical Reports Server (NTRS)

    Little, G.

    1981-01-01

    A 10 year game plan for transition to the operational system was developed in the State of Washington. The plan is to: examine the results of past demonstration projects to identify successful operational applications, take advantage of geographic information systems, and work toward reducing/eliminating constraints of the present system which inhibit operational use. Support for the LANDSAT program was demonstrated by sending a user representative to NOAA working in the development of a user oriented system. It is suggested that the state should reassess its position, by taking advantage of the past 8 years' experience, and coordinate efforts to enhance LANDSAT' advantages in a cost effective manner.

  10. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mauro, R.; Leach, S.

    This paper summarizes current and planned activities in the areas of hydrogen production and use, near-term venture opportunities, and codes and standards. The rationale for these efforts is to assess industry interest and engage in activities that move hydrogen technologies down the path to commercialization. Some of the work presented in this document is a condensed, preliminary version of reports being prepared under the DOE/NREL contract. In addition, the NHA work funded by Westinghouse Savannah River Corporation (WSRC) to explore the opportunities and industry interest in a Hydrogen Research Center is briefly described. Finally, the planned support of and industrymore » input to the Hydrogen Technical Advisory Panel (HTAP) on hydrogen demonstration projects is discussed.« less

  11. July 1999 working group meeting on heavy vehicle aerodynamic drag: presentations and summary of comments and conclusions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brady, M; Browand, F; Flowers, D

    A Working Group Meeting on Heavy Vehicle Aerodynamic Drag was held at University of Southern California, Los Angeles, California on July 30, 1999. The purpose of the meeting was to present technical details on the experimental and computational plans and approaches and provide an update on progress in obtaining experimental results, model developments, and simulations. The focus of the meeting was a review of University of Southern California's (USC) experimental plans and results and the computational results from Lawrence Livermore National Laboratory (LLNL) and Sandia National Laboratories (SNL) for the integrated tractor-trailer benchmark geometry called the Sandia Model. Much ofmore » the meeting discussion involved the NASA Ames 7 ft x 10 ft wind tunnel tests and the need for documentation of the results. The present and projected budget and funding situation was also discussed. Presentations were given by representatives from the Department of Energy (DOE) Office of Transportation Technology Office of Heavy Vehicle Technology (OHVT), LLNL, SNL, USC, and California Institute of Technology (Caltech). This report contains the technical presentations (viewgraphs) delivered at the Meeting, briefly summarizes the comments and conclusions, and outlines the future action items.« less

  12. Parents as Role Models: Parental Behavior Affects Adolescents' Plans for Work Involvement

    ERIC Educational Resources Information Center

    Wiese, Bettina S.; Freund, Alexandra M.

    2011-01-01

    This study (N = 520 high-school students) investigates the influence of parental work involvement on adolescents' own plans regarding their future work involvement. As expected, adolescents' perceptions of parental work behavior affected their plans for own work involvement. Same-sex parents served as main role models for the adolescents' own…

  13. On-the-fly scheduling as a manifestation of partial-order planning and dynamic task values.

    PubMed

    Hannah, Samuel D; Neal, Andrew

    2014-09-01

    The aim of this study was to develop a computational account of the spontaneous task ordering that occurs within jobs as work unfolds ("on-the-fly task scheduling"). Air traffic control is an example of work in which operators have to schedule their tasks as a partially predictable work flow emerges. To date, little attention has been paid to such on-the-fly scheduling situations. We present a series of discrete-event models fit to conflict resolution decision data collected from experienced controllers operating in a high-fidelity simulation. Our simulations reveal air traffic controllers' scheduling decisions as examples of the partial-order planning approach of Hayes-Roth and Hayes-Roth. The most successful model uses opportunistic first-come-first-served scheduling to select tasks from a queue. Tasks with short deadlines are executed immediately. Tasks with long deadlines are evaluated to assess whether they need to be executed immediately or deferred. On-the-fly task scheduling is computationally tractable despite its surface complexity and understandable as an example of both the partial-order planning strategy and the dynamic-value approach to prioritization.

  14. What is your hospitality quotient?

    PubMed

    DeSilets, Lyn

    2015-03-01

    In addition to the behind-the-scenes work involved with planning and implementing continuing nursing education activities, there are additional ways we can enhance the learner's experience. This article presents ideas on how to improve your hospitality quotient. Copyright 2015, SLACK Incorporated.

  15. DE-EE0006714 Final Report-Project Icebreaker™

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wagner, Lorry; Karpinski, David; Nagusky, Beth

    Project Icebreaker, a 20 Megawatt offshore wind project 8 miles north of Cleveland, OH in Lake Erie, has been under development by the Lake Erie Energy Development Corporation since 2009. Significant development efforts were completed prior to the award of DE-EE0006714 (December 2014). This report describes the status of the work performed under award DE-EE0006714. The work was organized into several categories or tasks. The report presents the status of that work in each of eleven (11) main tasks: 1) State and Federal Permits; 2) Mono Bucket Foundation Engineering; 3) Construction and Installation Engineering; 4) Cable Route Survey; 5) Electricalmore » System Design; 6) Power Off-take; 7) Project Costs and Risk Management; 8) Operations and Maintenance Planning; 9) Domestic Supply Chain Development; 10) Instrumentation Planning; and 11) Department of Energy Review.« less

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Beltran, C; Kamal, H

    Purpose: To provide a multicriteria optimization algorithm for intensity modulated radiation therapy using pencil proton beam scanning. Methods: Intensity modulated radiation therapy using pencil proton beam scanning requires efficient optimization algorithms to overcome the uncertainties in the Bragg peaks locations. This work is focused on optimization algorithms that are based on Monte Carlo simulation of the treatment planning and use the weights and the dose volume histogram (DVH) control points to steer toward desired plans. The proton beam treatment planning process based on single objective optimization (representing a weighted sum of multiple objectives) usually leads to time-consuming iterations involving treatmentmore » planning team members. We proved a time efficient multicriteria optimization algorithm that is developed to run on NVIDIA GPU (Graphical Processing Units) cluster. The multicriteria optimization algorithm running time benefits from up-sampling of the CT voxel size of the calculations without loss of fidelity. Results: We will present preliminary results of Multicriteria optimization for intensity modulated proton therapy based on DVH control points. The results will show optimization results of a phantom case and a brain tumor case. Conclusion: The multicriteria optimization of the intensity modulated radiation therapy using pencil proton beam scanning provides a novel tool for treatment planning. Work support by a grant from Varian Inc.« less

  17. [A decade of reflection on health plans in Spain. SESPAS report 2010].

    PubMed

    Fiuza Pérez, María Dolores; Aguiar Rodríguez, Juan Francisco; Monzón Batista, Nayra

    2010-12-01

    This article reports the experience of the Working Group of the SESPAS-SCSP (Spanish Society of Public Health and Healthcare Administration-Canary Islands Society of Public Health) in health policy and planning during the first decade of the 21st century and its possible impact on the design of health planning. We review the conclusions reached from 2000 to 2008 in the first five Biannual Planning and Health Policy meetings that took place during that period. The workshops were designed with two speakers who presented different views of the subject under discussion, a moderator, who led the debate on the findings, and a narrator who served as a notary and also took responsibility for the text summary of each table. Two general narrators were responsible for the final wording of the conclusions of each workshop or biannual meeting. From 2000 to 2008, there were 25 round tables with 121 conclusions and 160 participants. We believe that the SESPAS working groups provide multidisciplinary professional values within a context of debate in a professional environment, and create spaces for reflection, thus helping to improve the health planning system in Spain. Copyright © 2010 SESPAS. Published by Elsevier Espana. All rights reserved.

  18. Impact of model-based risk analysis for liver surgery planning.

    PubMed

    Hansen, C; Zidowitz, S; Preim, B; Stavrou, G; Oldhafer, K J; Hahn, H K

    2014-05-01

    A model-based risk analysis for oncologic liver surgery was described in previous work (Preim et al. in Proceedings of international symposium on computer assisted radiology and surgery (CARS), Elsevier, Amsterdam, pp. 353–358, 2002; Hansen et al. Int I Comput Assist Radiol Surg 4(5):469–474, 2009). In this paper, we present an evaluation of this method. To prove whether and how the risk analysis facilitates the process of liver surgery planning, an explorative user study with 10 liver experts was conducted. The purpose was to compare and analyze their decision-making. The results of the study show that model-based risk analysis enhances the awareness of surgical risk in the planning stage. Participants preferred smaller resection volumes and agreed more on the safety margins’ width in case the risk analysis was available. In addition, time to complete the planning task and confidence of participants were not increased when using the risk analysis. This work shows that the applied model-based risk analysis may influence important planning decisions in liver surgery. It lays a basis for further clinical evaluations and points out important fields for future research.

  19. Emergency Childcare for Hospital Workers During Disasters.

    PubMed

    Charney, Rachel L; Rebmann, Terri; Flood, Robert G

    2015-12-01

    The objectives were to determine the impact of emergency childcare (EC) needs on health care workers' ability and likelihood to work during a pandemic versus an earthquake as well as to determine the anticipated need and expected use of an on-site, hospital-provided EC program. An online survey was distributed to all employees of an academic, urban pediatric hospital. Two disaster scenarios were presented (pandemic influenza and earthquake). Ability to work based on childcare needs, planned use of proposed hospital-provided EC, and demographics of children being brought in were obtained. A total of 685 employees participated (96.6% female, 79.6% white), with a 40% response rate. Those with children (n = 307) reported that childcare needs would affect their work decisions during a pandemic more than an earthquake (61.1% vs 56.0%; t = 3.7; P < 0.001). Only 28.0% (n = 80) of those who would need childcare (n = 257) report an EC plan. The scenario did not impact EC need or planned use; during scheduled versus unscheduled shifts, 40.7% versus 63.0% reported need for EC, and 50.8% versus 63.2% reported anticipated using EC. Hospital workers have a high anticipated use of hospital-provided EC. Provisions for EC should be an integral part of hospital disaster planning.

  20. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1994.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1994-02-01

    This document is part of Bonneville Power Administration`s program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. The Fiscal Year 1994 (FY 1994) Annual Implementation Work Plan (AIWP) presents Bonneville Power Administration`s (BPA`s) plan for implementation of the Columbia River Basin Fish and Wildlife Program (Program). The purpose of the Program is to guide BPA and other federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife in the Columbia River Basin. Phase I began the work of salmonmore » recovery with certain fast-track measures completed in August 1991. Phase II dealt with Snake and Columbia river flow and salmon harvest and was completed in December 1991. Phase III dealt with system-wide habitat and salmon production issues and was completed in September 1992. Phase IV planning, focusing on resident fish and wildlife, began in August 1993, and was finished and adopted in November 1993. This report provides summaries of the ongoing and new projects for FY 1994 within the areas of juvenile migration, adult migration, salmon harvest, production and habitat, coordinated implementation, monitoring and evaluation, resident fish, and wildlife.« less

  1. An approach to human work systems development under the circumstances of an aging society and international business operations.

    PubMed

    Ikeda, Y T

    1997-12-01

    At least three serious aspects of problems exist as obstacles for the national economy in Japan to grow or even to maintain its present level: the lack of natural resources, the trends of a decreasing young labor force, and an increase in the shift of domestic business operations to foreign countries. Although top managers make the decisions of product or service planning, or both, work systems designers are also responsible for conserving the resources. An action against the decrease of the young work force is needed to maintain work systems in an operable condition. The business shifts to foreign countries affect all the people, who are losing job opportunities. The present paper presents an approach to reorienting human work systems within the scope of the work systems designers' roles under the circumstance of these social environments. The following discussion is based on the assumptions that work organizations be productive for themselves and the world, effective and efficient for themselves, and contributive to their communities and the world. In essence, an approach to human work systems development should be fair to managers and workers alike. Presented are cases of these work systems as developed along the perspectives mentioned.

  2. Global rainfall monitoring by SSM/I

    NASA Technical Reports Server (NTRS)

    Barrett, Eric C.; Kidd, C.; Kniveton, D.

    1993-01-01

    Significant accomplishments in the last year of research are presented. During 1991, three main activities were undertaken: (1) development and testing of a preliminary global rainfall algorithm; (2) researching areas of strong surface scattering; and (3) formulation of a program of work for the WetNet PrecipWG. Focus of present research and plans for next year are briefly dismissed.

  3. Planning, evaluation and analytical studies in planetary quarantine and spacecraft sterilization

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The technical and analytical support used to aid in developing requirements for planetary quarantine are presented. The investigation was divided into 8 work tasks which are presented in tabular form. Data include methods of sterilization, safety margins for quarantine, revision of contamination logs for Mars and Venus, and estimates of encapsulated and 'free' microbial burden.

  4. Vulnerability

    NASA Technical Reports Server (NTRS)

    Taback, I.

    1979-01-01

    The discussion of vulnerability begins with a description of some of the electrical characteristics of fibers before definiting how vulnerability calculations are done. The vulnerability results secured to date are presented. The discussion touches on post exposure vulnerability. After a description of some shock hazard work now underway, the discussion leads into a description of the planned effort and some preliminary conclusions are presented.

  5. Inventory and comparative evaluation of seabed mapping, classification and modeling activities in the Northwest Atlantic, USA to support regional ocean planning

    NASA Astrophysics Data System (ADS)

    Shumchenia, Emily J.; Guarinello, Marisa L.; Carey, Drew A.; Lipsky, Andrew; Greene, Jennifer; Mayer, Larry; Nixon, Matthew E.; Weber, John

    2015-06-01

    Efforts are in motion globally to address coastal and marine management needs through spatial planning and concomitant seabed habitat mapping. Contrasting strategies are often evident in these processes among local, regional, national and international scientific approaches and policy needs. In answer to such contrasts among its member states, the United States Northeast Regional Ocean Council formed a Habitat Working Group to conduct a regional inventory and comparative evaluation of seabed characterization, classification, and modeling activities in New England. The goals of this effort were to advance regional understanding of ocean habitats and identify opportunities for collaboration. Working closely with the Habitat Working Group, we organized and led the inventory and comparative analysis with a focus on providing processes and tools that can be used by scientists and managers, updated and adapted for future use, and applied in other ocean management regions throughout the world. Visual schematics were a critical component of the comparative analysis and aided discussion among scientists and managers. Regional consensus was reached on a common habitat classification scheme (U.S. Coastal and Marine Ecological Classification Standard) for regional seabed maps. Results and schematics were presented at a region-wide workshop where further steps were taken to initiate collaboration among projects. The workshop culminated in an agreement on a set of future seabed mapping goals for the region. The work presented here may serve as an example to other ocean planning regions in the U.S., Europe or elsewhere seeking to integrate a variety of seabed characterization, classification and modeling activities.

  6. The 1965 Mississippi River flood in Iowa

    USGS Publications Warehouse

    Schwob, Harlan H.; Myers, Richard E.

    1965-01-01

    Flood data compiled for the part of the River along the eastern border include flood discharges, flood elevations, and the frequency of floods of varying magnitudes. They also include the daily or more frequent stage and discharge data for both the Mississippi River and the downstream gaging stations on Iowa tributaries for the period March-May 1965. Sufficient data are presented to permit studied for preparation of plans for protective works and plans for zoning or for flood plain regulation.

  7. Poster — Thur Eve — 30: 4D VMAT dose calculation methodology to investigate the interplay effect: experimental validation using TrueBeam Developer Mode and Gafchromic film

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Teke, T; Milette, MP; Huang, V

    2014-08-15

    The interplay effect between the tumor motion and the radiation beam modulation during a VMAT treatment delivery alters the delivered dose distribution from the planned one. This work present and validate a method to accurately calculate the dose distribution in 4D taking into account the tumor motion, the field modulation and the treatment starting phase. A QUASAR™ respiratory motion phantom was 4D scanned with motion amplitude of 3 cm and with a 3 second period. A static scan was also acquired with the lung insert and the tumor contained in it centered. A VMAT plan with a 6XFFF beam wasmore » created on the averaged CT and delivered on a Varian TrueBeam and the trajectory log file was saved. From the trajectory log file 10 VMAT plans (one for each breathing phase) and a developer mode XML file were created. For the 10 VMAT plans, the tumor motion was modeled by moving the isocentre on the static scan, the plans were re-calculated and summed in the treatment planning system. In the developer mode, the tumor motion was simulated by moving the couch dynamically during the treatment. Gafchromic films were placed in the QUASAR phantom static and irradiated using the developer mode. Different treatment starting phase were investigated (no phase shift, maximum inhalation and maximum exhalation). Calculated and measured isodose lines and profiles are in very good agreement. For each starting phase, the dose distribution exhibit significant differences but are accurately calculated with the methodology presented in this work.« less

  8. Urban Climate Map System for Dutch spatial planning

    NASA Astrophysics Data System (ADS)

    Ren, Chao; Spit, Tejo; Lenzholzer, Sanda; Yim, Hung Lam Steve; Heusinkveld, Bert; van Hove, Bert; Chen, Liang; Kupski, Sebastian; Burghardt, René; Katzschner, Lutz

    2012-08-01

    Facing climate change and global warming, outdoor climatic environment is an important consideration factor for planners and policy makers because improving it can greatly contribute to achieve citizen's thermal comfort and create a better urban living quality for adaptation. Thus, the climatic information must be assessed systematically and applied strategically into the planning process. This paper presents a tool named Urban Climate Map System (UCMS) that has proven capable of helping compact cities to incorporate climate effects in planning processes in a systematic way. UCMS is developed and presented in a Geographic Information System (GIS) platform in which the lessons learned and experience gained from interdisciplinary studies can be included. The methodology of UCMS of compact cities, the construction procedure, and the basic input factors - including the natural climate resources and planning data - are described. Some literatures that shed light on the applicability of UMCS are reported. The Municipality of Arnhem is one of Dutch compact urban areas and still under fast urban development and urban renewal. There is an urgent need for local planners and policy makers to protect local climate and open landscape resources and make climate change adaptation in urban construction. Thus, Arnhem is chosen to carry out a case study of UCMS. Although it is the first work of Urban Climatic Mapping in The Netherlands, it serves as a useful climatic information platform to local planners and policy makers for their daily on-going works. We attempt to use a quick method to collect available climatic and planning data and create an information platform for planning use. It relies mostly on literature and theoretical understanding that has been well practiced elsewhere. The effort here is to synergize the established understanding for a case at hand and demonstrate how useful guidance can still be made for planners and policy makers.

  9. The Remote Observing Working Group for the Asteroid Impact and Deflection Assessment (AIDA)

    NASA Astrophysics Data System (ADS)

    Rivkin, A. S.; Pravec, P.; Thomas, C. A.; Thirouin, A.; Snodgrass, C.; Green, S.; Licandro, J.; Sickafoose, A. A.; Erasmus, N.; Howell, E. S.; Osip, D.; Thomas-Osip, J.; Moskovitz, N.; Scheirich, P.; Oszkiewicz, D.; Richardson, D. C.; Polishook, D.; Ryan, W. H.; Busch, M. W.

    2017-09-01

    The Asteroid Impact and Deflection Assessment (AIDA) is a joint US-European mission concept designed to demonstrate the effectiveness of an kinetic impactor for planetary defense. Ground-based observing is a key component to AIDA and critical for its success. We present the observing campaign we have been conducting of the asteroid Didymos, the AIDA target, and plans for future work.

  10. OMEGA FY13 HED requests - LANL

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Workman, Jonathan B; Loomis, Eric N

    2012-06-25

    This is a summary of scientific work to be performed on the OMEGA laser system located at the Laboratory for Laser Energetics in Rochester New York. The work is funded through Science and ICF Campagins and falls under the category of laser-driven High-Energy Density Physics experiments. This summary is presented to the Rochester scheduling committee on an annual basis for scheduling and planning purposes.

  11. Work-Related Demands and Life Satisfaction: The Effects of Engagement and Disengagement among Employed and Long-Term Unemployed People

    ERIC Educational Resources Information Center

    Korner, Astrid; Reitzle, Matthias; Silbereisen, Rainer K.

    2012-01-01

    Social change has accentuated various demands in people's work lives including, for instance, fears of being laid off, anticipated or experienced difficulties in finding a new and/or appropriate job or a lack of security in career planning. The present study on N=1751 employed, short-term unemployed, and long-term (greater than 12 months)…

  12. Transition and Post-School Outcomes for Youth with Disabilities: Closing the Gaps to Post-Secondary Education and Employment.

    ERIC Educational Resources Information Center

    National Council on Disability, Washington, DC.

    This report presents an analysis of research on the state of transition, post-secondary education, and employment outcomes for youth and young adults with disabilities over the past 25 years. It identifies what has worked in the areas of transition planning, services, and supports. It also considers what should work in light of unmet needs and…

  13. Thirty-fourth annual report of the Director of the United States Geological Survey

    USGS Publications Warehouse

    Smith, George Otis

    1913-01-01

    The appropriations for the work of the United States Geological Survey for the fiscal year 1912-13 comprised items amounting to $1,497,920. The plan of operations was approved by the Secretary of the Interior, and a detailed statement of the work of the several branches and divisions of the Survey is presented on later pages of this report.

  14. Thirty-first annual report of the Director of the United States Geological Survey

    USGS Publications Warehouse

    Smith, George Otis

    1910-01-01

    The appropriations for the work of the United States Geological Survey for the fiscal year 1909-10 comprised items amounting to $1,497,815. The plan of operations was approved by the Secretary of the Interior, and a detailed statement of the work of the several branches and divisions of the Survey is presented on later pages of this report.

  15. Thirty-third annual report of the Director of the United States Geological Survey

    USGS Publications Warehouse

    Smith, George Otis

    1912-01-01

    The appropriations for the work of the United States Geological Survey for the fiscal year 1911-12 comprised items amounting to $1,507,920. The plan of operations was approved by the Secretary of the Interior and a detailed statement of the work of the several branches and divisions of the Survey is presented on later pages of this report.

  16. Twenty-ninth annual report of the Director of the United States Geological Survey

    USGS Publications Warehouse

    Smith, George Otis

    1908-01-01

    The appropriations for the work of the United States Geological Survey for the fiscal year 1907-8 comprised items amounting to $1,661,420. The plan of operations was approved by the Secretary of the Interior and a detailed statement of the work of the various branches and divisions of the Survey is presented on later pages of this report.

  17. Thirty-fifth annual report of the Director of the United States Geological Survey

    USGS Publications Warehouse

    Smith, George Otis

    1914-01-01

    The appropriations for the work of the United States Geological Survey for the fiscal year 1913-14 comprised items amounting to $1,517,920. The plan of operations was approved by the Secretary of the Interior, and a detailed statement of the work of the several branches and divisions of the Survey is presented on later pages of this report.

  18. Thirtieth annual report of the Director of the United States Geological Survey

    USGS Publications Warehouse

    Smith, George Otis

    1909-01-01

    The appropriations for the work of the United States Geological Survey for the fiscal year 1908-9 comprised items amounting to $1,590,680. The plan of operations was approved by the Secretary of the Interior, and a detailed statement of the work of the various branches and divisions of the Survey is presented on later pages of this report.

  19. Thirty-sixth annual report of the Director of the United States Geological Survey

    USGS Publications Warehouse

    Smith, George Otis

    1915-01-01

    The appropriations for the work of the United States Geological Survey for the fiscal year 1914-15 comprised items amounting to $1,620,520. The plan of operations was approved by the Secretary of the Interior, and a detailed statement of the work of the several branches and divisions of the Survey is presented on later pages of this report.

  20. Thirty-second annual report of the Director of the United States Geological Survey

    USGS Publications Warehouse

    Smith, George Otis

    1911-01-01

    The appropriations for the work of the United States Geological Survey for the fiscal year 1910-11 comprised items amounting to $1,477,440. The plan of operations was approved by the Secretary of the Interior and a detailed statement of the work of the several branches and divisions of the Survey is presented on later pages of this report.

  1. Real-time path planning and autonomous control for helicopter autorotation

    NASA Astrophysics Data System (ADS)

    Yomchinda, Thanan

    Autorotation is a descending maneuver that can be used to recover helicopters in the event of total loss of engine power; however it is an extremely difficult and complex maneuver. The objective of this work is to develop a real-time system which provides full autonomous control for autorotation landing of helicopters. The work includes the development of an autorotation path planning method and integration of the path planner with a primary flight control system. The trajectory is divided into three parts: entry, descent and flare. Three different optimization algorithms are used to generate trajectories for each of these segments. The primary flight control is designed using a linear dynamic inversion control scheme, and a path following control law is developed to track the autorotation trajectories. Details of the path planning algorithm, trajectory following control law, and autonomous autorotation system implementation are presented. The integrated system is demonstrated in real-time high fidelity simulations. Results indicate feasibility of the capability of the algorithms to operate in real-time and of the integrated systems ability to provide safe autorotation landings. Preliminary simulations of autonomous autorotation on a small UAV are presented which will lead to a final hardware demonstration of the algorithms.

  2. Test Results for Caustic Demand Measurements on Tank 241-AX-101 and Tank 241-AX-103 Archive Samples

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Doll, Stephanie R.; Bolling, Stacie D.

    Caustic demand testing is used to determine the necessary amount of caustic required to neutralize species present in the Hanford tank waste and obtain a target molarity of free hydroxide for tank corrosion control. The presence and quantity of hydroxide-consuming analytes are just as important in determining the caustic demand as is the amount of free hydroxide present. No single data point can accurately predict whether a satisfactory hydroxide level is being met, as it is dependent on multiple factors (e.g., free hydroxide, buffers, amphoteric metal hydroxides, bicarbonate, etc.). This enclosure contains the caustic demand, scanning electron microscopy (SEM), polarizedmore » light microscopy (PLM), and X-ray diffraction (XRD) analysis for the tank 241-AX-101 (AX-101) and 241-AX-103 (AX-103) samples. The work was completed to fulfill a customer request outlined in the test plan, WRPS-1505529, “Test Plan and Procedure for Caustic Demand Testing on Tank 241-AX-101 and Tank 241-AX-103 Archive Samples.” The work results will provide a baseline to support planned retrieval of AX-101 and AX-103.« less

  3. Rebuilding for Sustainability: Case Studies in the Making (Presentation)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Billman, L.

    NREL has made significant contributions to communities suffering from natural disasters since 2007 in terms of technical assistance regarding energy efficiency and renewable energy options. NREL's work has covered all aspects of energy, including energy opportunities in community planning, policy design, new program design, and specific project design and implementation for energy related to electricity generation, building energy use, and transportation. This presentation highlights work done in New Orleans following Hurricane Katrina; Greensburg, Kansas, following a devastating tornado; and New York and New Jersey following Hurricane Sandy.

  4. Investigation of the Reverse Water Gas Shift Reaction for Production of Oxygen From Mars Atmospheric Carbon Dioxide

    NASA Technical Reports Server (NTRS)

    Meyer, Tom; Zubrin, Robert

    1997-01-01

    The first phase of the research includes a comprehensive analytical study examining the potential applications for engineering subsystems and mission strategies made possible by such RWGS based subsystems, and will include an actual experimental demonstration and performance characterization of a full-scale brassboard RWGS working unit. By the time of this presentation the laboratory demonstration unit will not yet be operational but we will present the results of our analytical studies to date and plans for the ongoing work.

  5. Teaching Fair Use with Astronomy Imagery

    NASA Astrophysics Data System (ADS)

    Wilson, Teresa

    2016-01-01

    Plagiarism among students is most common because of a misunderstanding of copyright and fair use. Images and text are frequently used without proper credit to the original author, and works are frequently acknowledged improperly. For example, space imagery is often used in posters, presentations, on the web, on Facebook, and even in the classrooms, but often are not properly cited. A lesson plan on fair use is presented, outlining what constitutes fair use and how to properly acknowledge the work done by artists and authors everywhere, with examples drawn from the Astronomy Picture of the Day (APOD).

  6. Multi-Element Integrated Project Planning at Kennedy Space Center

    NASA Technical Reports Server (NTRS)

    Mullon, Robert

    2008-01-01

    This presentation demonstrates how the ASRC Scheduling team developed working practices to support multiple NASA and ASRC Project Managers using the enterprise capabilities of Primavera P6 and P6 Web Access. This work has proceeded as part of Kennedy Ground Systems' preparation for its transition from the Shuttle Program to the Constellation Program. The presenters will cover Primavera's enterprise-class capabilities for schedule development, integrated critical path analysis, and reporting, as well as advanced Primavera P6 Web Access tools and techniques for communicating project status.

  7. Delphi based consensus study into planning for chemical incidents.

    PubMed

    Crawford, I W F; Mackway-Jones, K; Russell, D R; Carley, S D

    2004-01-01

    To achieve consensus in all phases of chemical incident planning and response. A three round Delphi study was conducted using a panel of 39 experts from specialties involved in the management of chemical incidents. Areas that did not reach consensus in the Delphi study were presented as synopsis statements for discussion in four syndicate groups at a conference hosted by the Department of Health Emergency Planning Co-ordination Unit. A total of 183 of 322 statements had reached consensus upon completion of the Delphi study. This represented 56.8% of the total number of statements. Of these, 148 reached consensus at >94% and 35 reached consensus at >89%. The results of the process are presented as a series of synopsis consensus statements that cover all phases of chemical incident planning and response. The use of a Delphi study and subsequent syndicate group discussions achieved consensus in aspects of all phases of chemical incident planning and response that can be translated into practical guidance for use at regional prehospital and hospital level. Additionally, areas of non-consensus have been identified where further work is required.

  8. Comparison of pre/post-operative CT image volumes to preoperative digitization of partial hepatectomies: a feasibility study in surgical validation

    NASA Astrophysics Data System (ADS)

    Dumpuri, Prashanth; Clements, Logan W.; Li, Rui; Waite, Jonathan M.; Stefansic, James D.; Geller, David A.; Miga, Michael I.; Dawant, Benoit M.

    2009-02-01

    Preoperative planning combined with image-guidance has shown promise towards increasing the accuracy of liver resection procedures. The purpose of this study was to validate one such preoperative planning tool for four patients undergoing hepatic resection. Preoperative computed tomography (CT) images acquired before surgery were used to identify tumor margins and to plan the surgical approach for resection of these tumors. Surgery was then performed with intraoperative digitization data acquire by an FDA approved image-guided liver surgery system (Pathfinder Therapeutics, Inc., Nashville, TN). Within 5-7 days after surgery, post-operative CT image volumes were acquired. Registration of data within a common coordinate reference was achieved and preoperative plans were compared to the postoperative volumes. Semi-quantitative comparisons are presented in this work and preliminary results indicate that significant liver regeneration/hypertrophy in the postoperative CT images may be present post-operatively. This could challenge pre/post operative CT volume change comparisons as a means to evaluate the accuracy of preoperative surgical plans.

  9. Delphi based consensus study into planning for chemical incidents

    PubMed Central

    Crawford, I; Mackway-Jones, K; Russell, D; Carley, S

    2004-01-01

    Objective: To achieve consensus in all phases of chemical incident planning and response. Design: A three round Delphi study was conducted using a panel of 39 experts from specialties involved in the management of chemical incidents. Areas that did not reach consensus in the Delphi study were presented as synopsis statements for discussion in four syndicate groups at a conference hosted by the Department of Health Emergency Planning Co-ordination Unit. Results: A total of 183 of 322 statements had reached consensus upon completion of the Delphi study. This represented 56.8% of the total number of statements. Of these, 148 reached consensus at >94% and 35 reached consensus at >89%. The results of the process are presented as a series of synopsis consensus statements that cover all phases of chemical incident planning and response. Conclusions: The use of a Delphi study and subsequent syndicate group discussions achieved consensus in aspects of all phases of chemical incident planning and response that can be translated into practical guidance for use at regional prehospital and hospital level. Additionally, areas of non-consensus have been identified where further work is required. PMID:14734369

  10. Training Planning and Working Memory in Third Graders

    ERIC Educational Resources Information Center

    Goldin, Andrea Paula; Segretin, Maria Soledad; Hermida, Maria Julia; Paz, Luciano; Lipina, Sebastian Javier; Sigman, Mariano

    2013-01-01

    Working memory and planning are fundamental cognitive skills supporting fluid reasoning. We show that 2 games that train working memory and planning skills in school-aged children promote transfer to 2 different tasks: an attentional test and a fluid reasoning test. We also show long-term improvement of planning and memory capacities in…

  11. Supersonics/Airport Noise Plan: An Evolutionary Roadmap

    NASA Technical Reports Server (NTRS)

    Bridges, James

    2011-01-01

    This presentation discusses the Plan for the Airport Noise Tech Challenge Area of the Supersonics Project. It is given in the context of strategic planning exercises being done in other Projects to show the strategic aspects of the Airport Noise plan rather than detailed task lists. The essence of this strategic view is the decomposition of the research plan by Concept and by Tools. Tools (computational, experimental) is the description of the plan that resources (such as researchers) most readily identify with, while Concepts (here noise reduction technologies or aircraft configurations) is the aspects that project management and outside reviewers most appreciate as deliverables and milestones. By carefully cross-linking these so that Concepts are addressed sequentially (roughly one after another) by researchers developing/applying their Tools simultaneously (in parallel with one another), the researchers can deliver milestones at a reasonable pace while doing the longer-term development that most Tools in the aeroacoustics science require. An example of this simultaneous application of tools was given for the Concept of High Aspect Ratio Nozzles. The presentation concluded with a few ideas on how this strategic view could be applied to the Subsonic Fixed Wing Project's Quiet Aircraft Tech Challenge Area as it works through its current roadmapping exercise.

  12. The teratology society 2012-2017 strategic plan: pushing the boundaries.

    PubMed

    Curran, Christine Perdan; Lau, Christopher; Schellpfeffer, Michael A; Stodgell, Christopher J; Carney, Edward W

    2013-01-01

    The Teratology Society held its fourth strategic planning session in Albuquerque, NM, April 10-12, 2012, and launched the 2012-2017 Strategic Plan in conjunction with the 2012 annual meeting in Baltimore, MD. Building on the energy of the successful implementation of prior strategic plans (San Diego, 2007; Nashville,TN 2002; Cincinnati, OH 1998), session participants worked to identify barriers to success as a scientific society, as well as impending challenges and opportunities to which the Society needs to respond. The following report provides an overview of the Strategic Planning process, objectives, activities, and conclusions. A total of 23 members were present at the session, and the group included representation from Council, various committees, and different member constituencies. This plan, Pushing the Boundaries, and its three strategic intents: Broaden Our Identity, Expand Our Membership, and Increase Our Influence, will drive the direction of the Teratology Society for the next five years. Copyright © 2013 Wiley Periodicals, Inc.

  13. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1993.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1992-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Annual Implementation World Plan (AIWP) presents BPA`s plans for implementing the Program during fiscal year (FY) 1993. The FY 1993 AIWP emphasizes continuation of 143 ongoing or projecting ongoing Programmore » projects, tasks, or task orders, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. The FY 1993 AIWP also contains three new Program projects or tasks that are planned to start in FY 1993.« less

  14. Translations on People’s Republic of China, Number 379

    DTIC Science & Technology

    1977-05-03

    TECHNOLOGICAL Family Planning, Birth Control Linked to Learning- From-Ta-chai (Various sources, various dates) 18 Family Planning Work Well Done in...Nan-kung-hsien Female Labor Force Liberated Through Birth Control Two Counties Hailed for Good Family Planning Work Careful Records Kept on Women...CSO: 4006 17 SCIENTIFIC AND TECHNOLOGICAL FAMILY PLANNING, BIRTH CONTROL LINKED TO LEARNING-FROM-TA-CHAI Family Planning Work Well Done in Nan-kung

  15. An honest day's work: pay for performance in a pediatric radiology department.

    PubMed

    Bisset, George S

    2017-06-01

    Compensation models in radiology take a variety of forms, but regardless of practice type, successful models must reward productivity, be simple, and epitomize fairness. The ideal model should also be flexible enough to transition, based upon the changing strategic goals of a department. The plan should be constructed around rewarding the behaviors that the organization values. In this minisymposium article the author presents the value of different types of compensation plans and discusses advantages and disadvantages. Finally, the author presents a pay-for-performance model that has had long-term success at a private-turned-academic practice in pediatric radiology.

  16. SeaWiFS Technical Report Series. Volume 42; Satellite Primary Productivity Data and Algorithm Development: A Science Plan for Mission to Planet Earth

    NASA Technical Reports Server (NTRS)

    Falkowski, Paul G.; Behrenfeld, Michael J.; Esaias, Wayne E.; Balch, William; Campbell, Janet W.; Iverson, Richard L.; Kiefer, Dale A.; Morel, Andre; Yoder, James A.; Hooker, Stanford B. (Editor); hide

    1998-01-01

    Two issues regarding primary productivity, as it pertains to the Sea-viewing Wide Field-of-view Sensor (SeaWiFS) Program and the National Aeronautics and Space Administration (NASA) Mission to Planet Earth (MTPE) are presented in this volume. Chapter 1 describes the development of a science plan for deriving primary production for the world ocean using satellite measurements, by the Ocean Primary Productivity Working Group (OPPWG). Chapter 2 presents discussions by the same group, of algorithm classification, algorithm parameterization and data availability, algorithm testing and validation, and the benefits of a consensus primary productivity algorithm.

  17. Collective Intelligence and Three Aspects of Planning in Organizations: A NASA Example

    NASA Technical Reports Server (NTRS)

    Billman, Dorrit; Feary, Michael

    2010-01-01

    For many complex sociotechnical systems, planning seems to require explicit coordination; certainly, in executing a plan the activities of different actors must be tightly coupled. However, distributing the needed planning information can be very burdensome and error prone, because different groups need different collections of information, updated or kept current on different time cycles. Further, the information needed to form successful plans is often highly distributed, and while feedback about the success of prior plans may exist, it may not be available to those in a position of using this to improve plans or to detect and resolve other problems in the system (Weick, 1995). Tools to support various aspects of planning have been developed, and can provide a huge benefit to the individuals working on that aspect. To be tractable, most solutions address a quite bounded slice of work, isolating it from the larger context. Prospective planning takes place over multiple, nested cycles of decision making. This builds a plan that specifies activities of different granularity. "Subplans" may specify multiple parallel activities by different groups and individuals, as well as sequential, nested actions by a single actor. Planning produces valuable, sharable, external, representations: in addition to prospective use, plans support retrospective assessment and also action in the present. Viewing planning in a larger context - both temporal and organizational -- enables noticing what one does not know and generating more systemic and effective solutions. Viewing a problem as one of collective intelligence invites thinking about the larger organizational context. Many approaches to supporting collective intelligence do not support execution of highly contingent actions, distributed across many players, and hence provide incomplete support for planning. However, CI technology maybe helpful in managing the processes of gathering information for decision making in planning and of distributing plan information to various actors, needed on various time cycles.

  18. 48 CFR 307.7108 - Statement of work.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Statement of work. 307... ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Plan 307.7108 Statement of work. (a) General. An SOW describes the work or services a contractor is to perform in reaching an end result without describing the...

  19. 7 CFR 1710.255 - Energy efficiency work plans-energy efficiency borrowers.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 11 2014-01-01 2014-01-01 false Energy efficiency work plans-energy efficiency... TO ELECTRIC LOANS AND GUARANTEES Construction Work Plans and Related Studies § 1710.255 Energy efficiency work plans—energy efficiency borrowers. (a) All energy efficiency borrowers must maintain a...

  20. Natural stones of historic and future importance in Sweden

    NASA Astrophysics Data System (ADS)

    Schouenborg, Björn; Andersson, Jenny; Göransson, Mattias

    2013-04-01

    Several activities and responsibilities of the Geological Survey of Sweden (SGU) are related to the work of the newly formed international Heritage Stone Task Group (HSTG) for designating historically important stones. SGU is among other things a referral organization, frequently dealing with the preparation of statements in connection with the quarrying permit applications of stone producers. When preparing these statements, SGU takes into account a number of parameters, e.g. the importance for local and regional business development, historic importance, area of occurrence, quality of the geological documentation of the stone type, peculiarities of the stone types and technical properties relevant for the intended use. Traditionally, SGU has not worked with bedrock mapping looking at the potential of natural stones production but more commonly looking at the potential production of aggregates, industrial minerals and metals. The competence is, therefore, presently being built up with new databases over important natural stone types and definition of criteria for their selection etc. In this respect the criteria defined by the HSTG provide important help. This work goes hand in hand with the task of proposing stone-deposits and quarries of "national interest". The criteria for selection of a stone type, quarry etc as one of national interest are currently being revised. SGU plays an important role in this work. However, the final decision and appointment lies in the hands of the Swedish Board of Housing, Building and Planning (Boverket), an authority dealing with sustainable land use and regional development, town and country planning. Boverket supervises how the planning legislation is handled by the municipal authorities and the county administrative boards. The two latter organizations are those in charge of giving extraction permits for stone quarrying. The "Hallandia gneiss", of SW Sweden, is described as a case story and presented in this paper. Keywords: Hallandia gneiss, natural stones, historic stones, urban planning and building

  1. Workplace managers' view of the role of co-workers in return-to-work.

    PubMed

    Dunstan, Debra A; MacEachen, Ellen

    2016-11-01

    Theoretical and empirical research findings attest to the workplace being a social environment in which co-workers have a critical influence on the employment outcomes and return-to-work (RTW) success of other employees. However, co-workers do not have a formal role in RTW planning. The aim of this study was to explore how managers responsible for developing and implementing RTW procedures view the role of co-workers in this process. An exploratory qualitative pilot study was conducted in Canada. Participants (1 male; 13 females; mean experience in RTW = 11.8 years) were workplace (n=8) or RTW managers (n=6) with direct oversight of RTW plans. The participants were recruited via invitation from a research institute and were drawn from three different provinces. Data were gathered via open-ended questions and were coded and subject to thematic analysis. Three key themes were identified: (1) Managers view RTW as having little relevance to co-workers but expect them to cooperate with the arrangements; (2) Formal procedures are inadequate when psychosocial barriers to work resumption are present, so managers use informal strategies to engage co-workers' emotional and social support; and (3) Managers have difficulty integrating RTW procedures with other legal obligations, such as privacy and confidentiality requirements. Existing arrangements for the development and implementation of RTW are sufficient most of the time, but may be inadequate when an injured worker presents with psychosocial barriers to work resumption. Implications for Rehabilitation Standard RTW arrangements can be inadequate when a RTW plan requires active co-worker support. Privacy and confidentiality provisions can result in managers using informal procedures for information exchange and to engage co-workers. The use of risk management strategies - assessment, consultation and communication - could be used to include co-workers when workplace issues threaten the success of a RTW plan.

  2. The Urban Dust Dome: A Demonstration Model

    ERIC Educational Resources Information Center

    Cross, Ralph D.

    1973-01-01

    Working plans for an inexpensive urban dust dome model are presented together with some generalizations about urban atmosphere pollution. Theories and principles of atmospheric pollution which are introduced can be made meaningful to elementary students through classroom use of this model. (SM)

  3. Flex for Success!

    ERIC Educational Resources Information Center

    Olmsted, Barney; Smith, Suzanne

    1989-01-01

    The authors state that flexible scheduling of work will become more common as employers attempt to deal with changes in the labor supply. Types of flexibility and potential benefits are described. The authors present the steps in developing and implementing a flexible workplace plan. (CH)

  4. Overview of Vertical Axis Wind Turbine (VAWT)

    NASA Technical Reports Server (NTRS)

    Sullivan, W. N.

    1979-01-01

    A survey is presented of the practices which were applied for designing VAWT blades. An attempt is made to discuss strengths and weaknesses of the existing procedures. Discussion is provided on planned or suggested future work in developing improved design tools.

  5. Los Angeles congestion reduction demonstration (Metro ExpressLanes) program. National evaluation : safety data test plan.

    DOT National Transportation Integrated Search

    1999-07-01

    This document presents human factors guidelines for designers, owners operators, and planners involved in the development and operation of traffic management centers. Dimensions of the work environment affecting operator and system performance are ad...

  6. Career Profiles.

    ERIC Educational Resources Information Center

    Dallas Independent School District, TX. Dept. of Research, Evaluation, and Information Systems.

    A guide to skilled occupations presents information on 30 occupations in narrative form. It is designed for students to use in career planning. For each occupation, the narrator describes, in conversational, first person form, the job, working conditions, necessary qualifications and personal characteristics, related school subjects, and…

  7. Research and development program plan for the Center for Engineering Systems Advanced Research (CESAR)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weisbin, C.R.; Hamel, W.R.; Barhen, J.

    1986-02-01

    The Oak Ridge National Laboratory has established the Center for Engineering Systems Advanced Research (CESAR) for the purpose of addressing fundamental problems of intelligent machine technologies. The purpose of this document is to establish a framework and guidelines for research and development within ORNL's CESAR program in areas pertaining to intelligent machines. The specific objective is to present a CESAR Research and Development Plan for such work with a planning horizon of five to ten years, i.e., FY 1985 to FY 1990 and beyond. As much as possible, the plan is based on anticipated DOE needs in the area ofmore » productivity increase and safety to the end of this century.« less

  8. The road plan model: Information model for planning road building activities

    NASA Technical Reports Server (NTRS)

    Azinhal, Rafaela K.; Moura-Pires, Fernando

    1994-01-01

    The general building contractor is presented with an information model as an approach for deriving a high-level work plan of construction activities applied to road building. Road construction activities are represented in a Road Plan Model (RPM), which is modeled in the ISO standard STEP/EXPRESS and adopts various concepts from the GARM notation. The integration with the preceding road design stage and the succeeding phase of resource scheduling is discussed within the framework of a Road Construction Model. Construction knowledge is applied to the road design and the terrain model of the surrounding road infrastructure for the instantiation of the RPM. Issues regarding the implementation of a road planner application supporting the RPM are discussed.

  9. SPANR planning and scheduling

    NASA Astrophysics Data System (ADS)

    Freund, Richard F.; Braun, Tracy D.; Kussow, Matthew; Godfrey, Michael; Koyama, Terry

    2001-07-01

    SPANR (Schedule, Plan, Assess Networked Resources) is (i) a pre-run, off-line planning and (ii) a runtime, just-in-time scheduling mechanism. It is designed to support primarily commercial applications in that it optimizes throughput rather than individual jobs (unless they have highest priority). Thus it is a tool for a commercial production manager to maximize total work. First the SPANR Planner is presented showing the ability to do predictive 'what-if' planning. It can answer such questions as, (i) what is the overall effect of acquiring new hardware or (ii) what would be the effect of a different scheduler. The ability of the SPANR Planner to formulate in advance tree-trimming strategies is useful in several commercial applications, such as electronic design or pharmaceutical simulations. The SPANR Planner is demonstrated using a variety of benchmarks. The SPANR Runtime Scheduler (RS) is briefly presented. The SPANR RS can provide benefit for several commercial applications, such as airframe design and financial applications. Finally a design is shown whereby SPANR can provide scheduling advice to most resource management systems.

  10. Career pathfinders: a qualitative study of career development.

    PubMed

    Beutell, Icholas J; O'Hare, Marianne M

    2006-04-01

    This paper examined the perceptions of career path and issues of MBA students in response to Lore's The Pathfinder, a comprehensive career-planning model. Using internet discussion boards, an interactive dialogue was mentioned by participants in response to the components of Lore's model. The sample consisted of 50 fully employed MBA students enrolled in a course on self-assessment and career planning. A total of 1,781 separate postings were made and analyzed, using inductive analysis derived from discussion threads based on Lore's categories: comments on Lore's Pathfinder model, living a life you love (what's the holdup, career fantasies, work and family issues, and career selection), how to get there from here (commitment and future from the present), and designing your future career. Findings indicated several interesting trends in the career planning of current MBA students, particularly the importance of self or self-reflective observations in real time as students who are also fully employed formulate career plans. Implications for psychologists and career counselors, career development models, and suggestions for research are presented.

  11. Dynamic interactions between visual working memory and saccade target selection

    PubMed Central

    Schneegans, Sebastian; Spencer, John P.; Schöner, Gregor; Hwang, Seongmin; Hollingworth, Andrew

    2014-01-01

    Recent psychophysical experiments have shown that working memory for visual surface features interacts with saccadic motor planning, even in tasks where the saccade target is unambiguously specified by spatial cues. Specifically, a match between a memorized color and the color of either the designated target or a distractor stimulus influences saccade target selection, saccade amplitudes, and latencies in a systematic fashion. To elucidate these effects, we present a dynamic neural field model in combination with new experimental data. The model captures the neural processes underlying visual perception, working memory, and saccade planning relevant to the psychophysical experiment. It consists of a low-level visual sensory representation that interacts with two separate pathways: a spatial pathway implementing spatial attention and saccade generation, and a surface feature pathway implementing color working memory and feature attention. Due to bidirectional coupling between visual working memory and feature attention in the model, the working memory content can indirectly exert an effect on perceptual processing in the low-level sensory representation. This in turn biases saccadic movement planning in the spatial pathway, allowing the model to quantitatively reproduce the observed interaction effects. The continuous coupling between representations in the model also implies that modulation should be bidirectional, and model simulations provide specific predictions for complementary effects of saccade target selection on visual working memory. These predictions were empirically confirmed in a new experiment: Memory for a sample color was biased toward the color of a task-irrelevant saccade target object, demonstrating the bidirectional coupling between visual working memory and perceptual processing. PMID:25228628

  12. [Acoustic conditions in open plan office - Application of technical measures in a typical room].

    PubMed

    Mikulski, Witold

    2018-03-09

    Noise in open plan offices should not exceed acceptable levels for the hearing protection. Its major negative effects on employees are nuisance and impediment in execution of work. Specific technical solutions should be introduced to provide proper acoustic conditions for work performance. Acoustic evaluation of a typical open plan office was presented in the article published in "Medycyna Pracy" 5/2016. None of the rooms meets all the criteria, therefore, in this article one of the rooms was chosen to apply different technical solutions to check the possibility of reaching proper acoustic conditions. Acoustic effectiveness of those solutions was verified by means of digital simulation. The model was checked by comparing the results of measurements and calculations before using simulation. The analyzis revealed that open plan offices supplemented with signals for masking speech signals can meet all the required criteria. It is relatively easy to reach proper reverberation time (i.e., sound absorption). It is more difficult to reach proper values of evaluation parameters determined from A-weighted sound pressure level (SPLA) of speech. The most difficult is to provide proper values of evaluation parameters determined from speech transmission index (STI). Finally, it is necessary (besides acoustic treatment) to use devices for speech masking. The study proved that it is technically possible to reach proper acoustic condition. Main causes of employees complaints in open plan office are inadequate acoustic work conditions. Therefore, it is necessary to apply specific technical solutions - not only sound absorbing suspended ceiling and high acoustic barriers, but also devices for speech masking. Med Pr 2018;69(2):153-165. This work is available in Open Access model and licensed under a CC BY-NC 3.0 PL license.

  13. Overview of the NASA/RECON educational, research, and development activities of the Computer Science Departments of the University of Southwestern Louisiana and Southern University

    NASA Technical Reports Server (NTRS)

    Dominick, Wayne D. (Editor)

    1984-01-01

    This document presents a brief overview of the scope of activities undertaken by the Computer Science Departments of the University of Southern Louisiana (USL) and Southern University (SU) pursuant to a contract with NASA. Presented are only basic identification data concerning the contract activities since subsequent entries within the Working Paper Series will be oriented specifically toward a detailed development and presentation of plans, methodologies, and results of each contract activity. Also included is a table of contents of the entire USL/DBMS NASA/RECON Working Paper Series.

  14. Theoretical Studies of Processes Affecting the Stratospheric and Free Tropospheric Aerosols

    NASA Technical Reports Server (NTRS)

    Hamill, Patrick

    1999-01-01

    This report describes the work done with funding from NASA Grant during the past three years. Funding commenced in June, 1996 and had a planned duration of three years. This report covers the time period June 1996 to June 1999. Here we present a short description of the projects carried out and documentation of the work done in terms of publications, papers presented, and conferences attended: microphysical modeling consist of two related tasks (1) development of a simple microphysical model for modeling the Pinatubo plume and (2) carrying out a study of sulfate particle formation in volcanic plume.Also analysis of sun photometer measurements are presented.

  15. Extent and frequency of floods on Delaware River in vicinity of Belvidere, New Jersey

    USGS Publications Warehouse

    Farlekas, George M.

    1966-01-01

    A stream overflowing its banks is a natural phenomenon. This natural phenomenon of flooding has occurred on the Delaware River in the past and will occur in the future. T' o resulting inundation of large areas can cause property damage, business losses and possible loss of life, and may result in emergency costs for protection, rescue, and salvage work. For optimum development of the river valley consistent with the flood risk, an evaluation of flood conditions is necessary. Basic data and the interpretation of the data on the regimen of the streams, particularly the magnitude of floods to be expected, the frequency of their occurrence, and the areas inundated, are essential for planning and development of flood-prone areas.This report presents information relative to the extent, depth, and frequency of floods on the Delaware River and its tributaries in the vicinity of Belvidere, N.J. Flooding on the tributaries detailed in the report pertains only to the effect of backwater from the Delaware River. Data are presented for several past floods with emphasis given to the floods of August 19, 1955 and May 24, 1942. In addition, information is given for a hypothetical flood based on the flood of August 19, 1955 modified by completed (since 1955) and planned flood-control works.By use of relations presented in this report the extent, depth, and frequency of flooding can be estimated for any site along the reach of the Delaware River under study. Flood data and the evaluation of the data are presented so that local and regional agencies, organizations, and individuals may have a technical basis for making decisions on the use of flood-prone areas. The Delaware River Basin Commission and the U.S. Geological Survey regard this program of flood-plain inundation studies as a positive step toward flood-damage prevention. Flood-plain inundation studies, when followed by appropriate land-use regulations, are a valuable and economical supplement to physical works for flood control, such as dams and levees. Both physical works and flood-plain regulations are included in the comprehensive plans for development of the Delaware River basin.Recommendations for land use, or suggestions for limitations of land use, are not made herein. Other reports on recommended general use and regulation of land in flood-prone areas are available (Dola, 1961; White, 1961; American Society of Civil Engineers Task Force on Flood Plain Regulations, 1962; and Goddard, 1963). The primary responsibility for planning for the optimum land use in the flood plain and the implementation of flood-plain zoning or other regulations to achieve such optimum use rest with the state and local interests. The preparation of this report was undertaken after consultation with representatives of the Lehigh-Northampton Counties, Pennsylvania, Joint Planning Commission and the Warren County, New Jersey, Regional Planning Board and after both had demonstrated their need for flood-plain information and their willingness to consider flood-plain regulations.

  16. Autonomous Spacecraft Communication Interface for Load Planning

    NASA Technical Reports Server (NTRS)

    Dever, Timothy P.; May, Ryan D.; Morris, Paul H.

    2014-01-01

    Ground-based controllers can remain in continuous communication with spacecraft in low Earth orbit (LEO) with near-instantaneous communication speeds. This permits near real-time control of all of the core spacecraft systems by ground personnel. However, as NASA missions move beyond LEO, light-time communication delay issues, such as time lag and low bandwidth, will prohibit this type of operation. As missions become more distant, autonomous control of manned spacecraft will be required. The focus of this paper is the power subsystem. For present missions, controllers on the ground develop a complete schedule of power usage for all spacecraft components. This paper presents work currently underway at NASA to develop an architecture for an autonomous spacecraft, and focuses on the development of communication between the Mission Manager and the Autonomous Power Controller. These two systems must work together in order to plan future load use and respond to unanticipated plan deviations. Using a nominal spacecraft architecture and prototype versions of these two key components, a number of simulations are run under a variety of operational conditions, enabling development of content and format of the messages necessary to achieve the desired goals. The goals include negotiation of a load schedule that meets the global requirements (contained in the Mission Manager) and local power system requirements (contained in the Autonomous Power Controller), and communication of off-plan disturbances that arise while executing a negotiated plan. The message content is developed in two steps: first, a set of rapid-prototyping "paper" simulations are preformed; then the resultant optimized messages are codified for computer communication for use in automated testing.

  17. Plans and Considerations for the Exploration of Space

    NASA Technical Reports Server (NTRS)

    Derkowski, Brian J.

    2001-01-01

    The Mars Settlement Design Competition is a program for high school students and teachers to experience the process of mission and hardware design. It provides a top level view into how NASA plans to explore space. I will be involved with all three days of this competition. On Friday I plan to give two presentations, one to the employees of White Sands Test Facility and one to students and teachers. On Saturday, I will have a question and answer session with some of the teachers participating in the workshop. Sunday I will serve as one of the judges that will review the students projects created over the weekend. The main emphasis of my talk will focus on exploring the possibilities of the future of space exploration. I will discuss the Mars Reference Mission 3.0, as well as some of the current robotic missions being sent to Mars. Next, I will present a business model perfected by Hum Mandell, showing how the public, private, and commercial sectors all play a major role in sending humans to Mars. I will also discuss the work of the Integrated Design Team at JSC and how that working together approach is key for a successful design. Finally, I will present that the question of how humans can reach out beyond low earth orbit and place permanent settlements on Mars is really a function of the imagination of those who intend on going there.

  18. Work Package 5: Contingency Management. Mission Planning Requirements Document: Preliminary Version. Revision A

    NASA Technical Reports Server (NTRS)

    2005-01-01

    The purpose of this document is to identify the general flight/mission planning requirements for same-day file-and-fly access to the NAS for both civil and military High-Altitude Long Endurance (HALE) Unmanned Aircraft System (UAS). Currently the scope of this document is limited to Step 1, operations above flight level 43,000 feet (FL430). This document describes the current applicable mission planning requirements and procedures for both manned and unmanned aircraft and addresses HALE UAS flight planning considerations in the future National Airspace System (NAS). It also discusses the unique performance and operational capabilities of HALE UAS associated with the Access 5 Project, presents some of the projected performance characteristics and conceptual missions for future systems, and provides detailed analysis of the recommended mission planning elements for operating HALE UAS in the NAS.

  19. SWOT analysis of a pediatric rehabilitation programme: a participatory evaluation fostering quality improvement.

    PubMed

    Camden, Chantal; Swaine, Bonnie; Tétreault, Sylvie; Bergeron, Sophie

    2009-01-01

    To present the results of a strengths, weaknesses, opportunities and threats (SWOT) analysis used as part of a process aimed at reorganising services provided within a pediatric rehabilitation programme (PRP) in Quebec, Canada and to report the perceptions of the planning committee members regarding the usefulness of the SWOT in this process. Thirty-six service providers working in the PRP completed a SWOT questionnaire and reported what they felt worked and what did not work in the existing model of care. Their responses were used by a planning committee over a 12-month period to assist in the development of a new service delivery model. Committee members shared their thoughts about the usefulness of the SWOT. Current programme strengths included favourable organisational climate and interdisciplinary work whereas weaknesses included lack of psychosocial support to families and long waiting times for children. Opportunities included working with community partners, whereas fear of losing professional autonomy with the new service model was a threat. The SWOT results helped the planning committee redefine the programme goals and make decisions to improve service coordination. SWOT analysis was deemed as a very useful tool to help guide service reorganisation. SWOT analysis appears to be an interesting evaluation tool to promote awareness among service providers regarding the current functioning of a rehabilitation programme. It fosters their active participation in the reorganisation of a new service delivery model for pediatric rehabilitation.

  20. Remedial investigation concept plan for the groundwater operable units at the chemical plant area and the ordnance works area, Weldon Spring, Missouri

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1999-07-15

    The U.S. Department of Energy (DOE) and the U.S. Department of the Army (DA) are conducting cleanup activities at two properties--the DOE chemical plant area and the DA ordnance works area (the latter includes the training area)--located in the Weldon Spring area in St. Charles County, Missouri. These areas are on the National Priorities List (NPL), and cleanup activities at both areas are conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. DOE and DA are conducting a joint remedial investigation (RI) and baseline risk assessment (BRA) as part of the remedial investigation/feasibility studymore » (RI/FS) for the groundwater operable units for the two areas. This joint effort will optimize further data collection and interpretation efforts and facilitate overall remedial decision making since the aquifer of concern is common to both areas. A Work Plan issued jointly in 1995 by DOE and the DA discusses the results of investigations completed at the time of preparation of the report. The investigations were necessary to provide an understanding of the groundwater system beneath the chemical plant area and the ordnance works area. The Work Plan also identifies additional data requirements for verification of the evaluation presented.« less

  1. Nuclear Thermal Propulsion Technology - Summary of FY 1991 Interagency Panel Planning

    NASA Technical Reports Server (NTRS)

    Clark, John S.; Mcdaniel, Patrick; Howe, Steven; Stanley, Marland

    1991-01-01

    An Interagency (NASA/DOE/DOD) technical panel has been working in 1991 to evaluate nuclear thermal propulsion (NTP) concepts on a consistent basis, and to continue technology development project planning for a joint project in nuclear propulsion for Space Exploration Initiative (SEI). This paper summarizes the efforts of the panel to date and summarizes the technology plans defined for NTP. Concepts were categorized based on probable technology readiness data, and innovative 'proof-of-concept' tests and analyses were defined. While further studies will be required to provide a consistent comparison of all of the NTP concepts, the current status of the studies is presented.

  2. Constellation Mission Operation Working Group: ESMO Maneuver Planning Process Review

    NASA Technical Reports Server (NTRS)

    Moyer, Eric

    2015-01-01

    The Earth Science Mission Operation (ESMO) Project created an Independent Review Board to review our Conjunction Risk evaluation process and Maneuver Planning Process to identify improvements that safely manages mission conjunction risks, maintains ground track science requirements, and minimizes overall hours expended on High Interest Events (HIE). The Review Board is evaluating the current maneuver process which requires support by multiple groups. In the past year, there have been several changes to the processes although many prior and new concerns exist. This presentation will discuss maneuver process reviews and Board comments, ESMO assessment and path foward, ESMO future plans, recent changes and concerns.

  3. A planning and scheduling lexicon

    NASA Technical Reports Server (NTRS)

    Cruz, Jennifer W.; Eggemeyer, William C.

    1989-01-01

    A lexicon related to mission planning and scheduling for spacecraft is presented. Planning and scheduling work is known as sequencing. Sequencing is a multistage process of merging requests from both the science and engineering arenas to accomplish the objectives defined in the requests. The multistage process begins with the creation of science and engineering goals, continues through their integration into the sequence, and eventually concludes with command execution onboard the spacecraft. The objective of this publication is to introduce some formalism into the field of spacecraft sequencing-system technology. This formalism will make it possible for researchers and potential customers to communicate about system requirements and capabilities in a common language.

  4. Oncology disease management.

    PubMed

    Fetterolf, Donald E; Terry, Rachel

    2007-02-01

    Oncologic conditions are ubiquitous medical illnesses that present a particular challenge for medical management programs designed to address quality and cost issues in patient populations. Disease management strategies represent a reasonable and effective approach for employers and health plans in their arsenal of health management strategies. Multiple reasons exist for the development of specialized disease management programs that deal with cancer patients, some unique to this group of individuals. Health plans and/or employers have solid justification for addressing these issues directly through programs developed specifically to work with cancer patients. Whether developed within a health plan, or "carved out" to an external vendor, proper evaluation of outcomes is essential.

  5. Dental manpower planning in India: current scenario and future projections for the year 2020.

    PubMed

    Vundavalli, Sudhakar

    2014-04-01

    Dental manpower issues in India are discussed in this article which consists of both qualitative and quantitative research. The output of qualified dentists has increased substantially over last decade and at present there are over 117,825 dentists working in India. Although India has a dentist to population ratio of 1:10,271, the newly graduating dentists find it difficult to survive in the private sector. At present less than approximately 5% graduated dentists are working in the Government sector. If the present situation continues there will be more than one lakh dentists over supply by the year 2020. Continuation of the current situation will lead to wastage of highly trained dental manpower and create a threat to the professional integrity of the dentists. This research highlights the fact that there is an urgent need for an organised national human resource planning system to control the supply and demand of dental manpower, to ensure a uniform distribution of manpower and to give future directions to policy makers. © 2013 FDI World Dental Federation.

  6. Mobile, Collaborative Situated Knowledge Creation for Urban Planning

    PubMed Central

    Zurita, Gustavo; Baloian, Nelson

    2012-01-01

    Geo-collaboration is an emerging research area in computer sciences studying the way spatial, geographically referenced information and communication technologies can support collaborative activities. Scenarios in which information associated to its physical location are of paramount importance are often referred as Situated Knowledge Creation scenarios. To date there are few computer systems supporting knowledge creation that explicitly incorporate physical context as part of the knowledge being managed in mobile face-to-face scenarios. This work presents a collaborative software application supporting visually-geo-referenced knowledge creation in mobile working scenarios while the users are interacting face-to-face. The system allows to manage data information associated to specific physical locations for knowledge creation processes in the field, such as urban planning, identifying specific physical locations, territorial management, etc.; using Tablet-PCs and GPS in order to geo-reference data and information. It presents a model for developing mobile applications supporting situated knowledge creation in the field, introducing the requirements for such an application and the functionalities it should have in order to fulfill them. The paper also presents the results of utility and usability evaluations. PMID:22778639

  7. Mobile, collaborative situated knowledge creation for urban planning.

    PubMed

    Zurita, Gustavo; Baloian, Nelson

    2012-01-01

    Geo-collaboration is an emerging research area in computer sciences studying the way spatial, geographically referenced information and communication technologies can support collaborative activities. Scenarios in which information associated to its physical location are of paramount importance are often referred as Situated Knowledge Creation scenarios. To date there are few computer systems supporting knowledge creation that explicitly incorporate physical context as part of the knowledge being managed in mobile face-to-face scenarios. This work presents a collaborative software application supporting visually-geo-referenced knowledge creation in mobile working scenarios while the users are interacting face-to-face. The system allows to manage data information associated to specific physical locations for knowledge creation processes in the field, such as urban planning, identifying specific physical locations, territorial management, etc.; using Tablet-PCs and GPS in order to geo-reference data and information. It presents a model for developing mobile applications supporting situated knowledge creation in the field, introducing the requirements for such an application and the functionalities it should have in order to fulfill them. The paper also presents the results of utility and usability evaluations.

  8. What are check dams made for? An historical perspective from the French experience

    NASA Astrophysics Data System (ADS)

    Piton, Guillaume; Carladous, Simon; Recking, Alain

    2015-04-01

    The mitigation of torrent related hazards is an important issue in mountainous regions. Structural mitigation measures have been implemented on hill slopes and in streambeds for more than 150 years in all Europe. Check dams play a key role in these mitigation plans and can have highly variable functions (horizontal and vertical stabilization of streambeds, consolidation of hillslopes' toe, retention of sediments, modulations of high solid discharges, lowering of streambed slope, etc.). Thousands of structures had been built more than a century ago. Since their construction, land uses evolved, torrent control works, associated with reforestation, curtailed a part of the sediment production. According to field experience, defining the initial and current functions of some old structures can remain challenging in some cases. To better understand for which purposes thousands of these structures were built during the 19th and 20th centuries , we analyzed old books to determine: what was the history of the comprehension of the processes involved in torrent related hazards? and; how the use of check dams evolved to take into account this improving comprehension? i.e. how the human actions on watercourses co-evolved with scientific knowledge from the early 19th centuries to nowadays? The presentation does not aim to determine who, the first, addressed any scientific question: equivalent history and scientific works took place in all regions of the world at different time and the French were not the first to build check dams and to undertook watershed scale mitigation plans. But the French example is interesting because the torrent control works were planned in mountainous regions at the country scale (the Alps, the Pyrenees and the Massif Central). Initial plans were to reforest mountains, relying on civil engineering works if needed. Their implementation , through the French Mountain Lands' reforestation and grass seeding laws of 1860 and 1864, proved to be difficult for technical and sociological reasons. The Mountain lands' conservation and restoration law of 1882 aimed to better fit local issues. The idea of the presentation is thus to highlight how evolved the historical comprehension of torrential hazards and of the usefulness of check dams in mitigation plans in a changing environment on the technical as well as on the sociological and regulatory points of view. Pioneering scientific and technical works on torrential hydraulics and check dams will be presented. Describing the global context that leads to French laws of 1860,1864 and 1882 will allow us to explain the extensive development of the works in more than a thousand of torrents and a hundred of big landslides. We then will discuss the evolution of technics during the beginning of the 20th century and the changes induced after WWII by the arrival of reinforced-concrete technics. We will conclude the presentation with a synthesis table aiming to highlight the different functions of check dams based on a description of their situations in the watershed, compare to other structures' situations and on shape criteria. This historical perspective will hopefully help people to better understand for which purposes some structures have been built in the past centuries and what lessons can be learnt from this assessment.

  9. 48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and..., safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... safety and health standards applicable to the work conditions of contractor and subcontractor employees...

  10. 48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and..., safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... safety and health standards applicable to the work conditions of contractor and subcontractor employees...

  11. 48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and..., safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... safety and health standards applicable to the work conditions of contractor and subcontractor employees...

  12. 48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and..., safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... safety and health standards applicable to the work conditions of contractor and subcontractor employees...

  13. 20 CFR 411.450 - What is an Individual Work Plan?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 2 2011-04-01 2011-04-01 false What is an Individual Work Plan? 411.450 Section 411.450 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE TICKET TO WORK AND SELF-SUFFICIENCY... work plan (IWP) is a required written document signed by an employment network (EN) (other than a State...

  14. 20 CFR 411.450 - What is an Individual Work Plan?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false What is an Individual Work Plan? 411.450 Section 411.450 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE TICKET TO WORK AND SELF-SUFFICIENCY... work plan (IWP) is a required written document signed by an employment network (EN) (other than a State...

  15. Simulations using patient data to evaluate systematic errors that may occur in 4D treatment planning: a proof of concept study.

    PubMed

    St James, Sara; Seco, Joao; Mishra, Pankaj; Lewis, John H

    2013-09-01

    The purpose of this work is to present a framework to evaluate the accuracy of four-dimensional treatment planning in external beam radiation therapy using measured patient data and digital phantoms. To accomplish this, 4D digital phantoms of two model patients were created using measured patient lung tumor positions. These phantoms were used to simulate a four-dimensional computed tomography image set, which in turn was used to create a 4D Monte Carlo (4DMC) treatment plan. The 4DMC plan was evaluated by simulating the delivery of the treatment plan over approximately 5 min of tumor motion measured from the same patient on a different day. Unique phantoms accounting for the patient position (tumor position and thorax position) at 2 s intervals were used to represent the model patients on the day of treatment delivery and the delivered dose to the tumor was determined using Monte Carlo simulations. For Patient 1, the tumor was adequately covered with 95.2% of the tumor receiving the prescribed dose. For Patient 2, the tumor was not adequately covered and only 74.3% of the tumor received the prescribed dose. This study presents a framework to evaluate 4D treatment planning methods and demonstrates a potential limitation of 4D treatment planning methods. When systematic errors are present, including when the imaging study used for treatment planning does not represent all potential tumor locations during therapy, the treatment planning methods may not adequately predict the dose to the tumor. This is the first example of a simulation study based on patient tumor trajectories where systematic errors that occur due to an inaccurate estimate of tumor motion are evaluated.

  16. Using Balanced Time Perspective to Explain Well-Being and Planning in Retirement.

    PubMed

    Mooney, Anna; Earl, Joanne K; Mooney, Carl H; Bateman, Hazel

    2017-01-01

    The notion of whether people focus on the past, present or future, and how it shapes their behavior is known as Time Perspective. Fundamental to the work of two of its earliest proponents, Zimbardo and Boyd (2008), was the concept of balanced time perspective and its relationship to wellness. A person with balanced time perspective can be expected to have a flexible temporal focus of mostly positive orientations (past-positive, present-hedonistic, and future) and much less negative orientations (past-negative and present-fatalistic). This study measured deviation from balanced time perspective (DBTP: Zhang et al., 2013) in a sample of 243 mature adults aged 45 to 91 years and explored relationships to Retirement Planning, Depression, Anxiety, Stress, Positive Mood, and Negative Mood. Results indicate that DBTP accounts for unexplained variance in the outcome measures even after controlling for demographic variables. DBTP was negatively related to Retirement Planning and Positive Mood and positively related to Depression, Anxiety, Stress, and Negative Mood. Theoretical and practical implications regarding balanced time perspective are discussed.

  17. Research and applications: Artificial intelligence

    NASA Technical Reports Server (NTRS)

    Raphael, B.; Duda, R. O.; Fikes, R. E.; Hart, P. E.; Nilsson, N. J.; Thorndyke, P. W.; Wilber, B. M.

    1971-01-01

    Research in the field of artificial intelligence is discussed. The focus of recent work has been the design, implementation, and integration of a completely new system for the control of a robot that plans, learns, and carries out tasks autonomously in a real laboratory environment. The computer implementation of low-level and intermediate-level actions; routines for automated vision; and the planning, generalization, and execution mechanisms are reported. A scenario that demonstrates the approximate capabilities of the current version of the entire robot system is presented.

  18. NASA/DOE/DOD nuclear propulsion technology planning: Summary of FY 1991 interagency panel results

    NASA Technical Reports Server (NTRS)

    Clark, John S.; Wickenheiser, Timothy J.; Doherty, Michael P.; Marshall, Albert; Bhattacharryya, Samit K.; Warren, John

    1992-01-01

    Interagency (NASA/DOE/DOD) technical panels worked in 1991 to evaluate critical nuclear propulsion issues, compare nuclear propulsion concepts for a manned Mars mission on a consistent basis, and to continue planning a technology development project for the Space Exploration Initiative (SEI). Panels were formed to address mission analysis, nuclear facilities, safety policy, nuclear fuels and materials, nuclear electric propulsion technology, and nuclear thermal propulsion technology. A summary of the results and recommendations of the panels is presented.

  19. Monte Carlo treatment planning with modulated electron radiotherapy: framework development and application

    NASA Astrophysics Data System (ADS)

    Alexander, Andrew William

    Within the field of medical physics, Monte Carlo radiation transport simulations are considered to be the most accurate method for the determination of dose distributions in patients. The McGill Monte Carlo treatment planning system (MMCTP), provides a flexible software environment to integrate Monte Carlo simulations with current and new treatment modalities. A developing treatment modality called energy and intensity modulated electron radiotherapy (MERT) is a promising modality, which has the fundamental capabilities to enhance the dosimetry of superficial targets. An objective of this work is to advance the research and development of MERT with the end goal of clinical use. To this end, we present the MMCTP system with an integrated toolkit for MERT planning and delivery of MERT fields. Delivery is achieved using an automated "few leaf electron collimator" (FLEC) and a controller. Aside from the MERT planning toolkit, the MMCTP system required numerous add-ons to perform the complex task of large-scale autonomous Monte Carlo simulations. The first was a DICOM import filter, followed by the implementation of DOSXYZnrc as a dose calculation engine and by logic methods for submitting and updating the status of Monte Carlo simulations. Within this work we validated the MMCTP system with a head and neck Monte Carlo recalculation study performed by a medical dosimetrist. The impact of MMCTP lies in the fact that it allows for systematic and platform independent large-scale Monte Carlo dose calculations for different treatment sites and treatment modalities. In addition to the MERT planning tools, various optimization algorithms were created external to MMCTP. The algorithms produced MERT treatment plans based on dose volume constraints that employ Monte Carlo pre-generated patient-specific kernels. The Monte Carlo kernels are generated from patient-specific Monte Carlo dose distributions within MMCTP. The structure of the MERT planning toolkit software and optimization algorithms are demonstrated. We investigated the clinical significance of MERT on spinal irradiation, breast boost irradiation, and a head and neck sarcoma cancer site using several parameters to analyze the treatment plans. Finally, we investigated the idea of mixed beam photon and electron treatment planning. Photon optimization treatment planning tools were included within the MERT planning toolkit for the purpose of mixed beam optimization. In conclusion, this thesis work has resulted in the development of an advanced framework for photon and electron Monte Carlo treatment planning studies and the development of an inverse planning system for photon, electron or mixed beam radiotherapy (MBRT). The justification and validation of this work is found within the results of the planning studies, which have demonstrated dosimetric advantages to using MERT or MBRT in comparison to clinical treatment alternatives.

  20. Sure-Fire Presentations. Bar/School Partnership Programs. [Revised.

    ERIC Educational Resources Information Center

    Gallagher, Arlene; And Others

    The purpose of this document is to give lawyers who are planning to work with students some practical advice that will make their presentations more effective. The advice should be helpful as lawyers make school visits for Law Day or even if they visit several times. As the article suggests, the first step is for the attorney to get to know the…

  1. Working on Mars: Understanding How Scientists, Engineers and Rovers Interacted Across Space and Time during the Mars Exploration Rover (MER) Mission

    NASA Technical Reports Server (NTRS)

    Wales, Roxana C.

    2005-01-01

    This viewgraph presentation summarizes the scheduling and planning difficulties inherent in operating the Mars Exploration Rovers (MER) during the overlapping terrestrial day and Martian sol. The presentation gives special empahsis to communication between the teams controlling the rovers from Earth, and keeping track of time on the two planets.

  2. Mission Status at Aura Science Team MOWG Meeting: EOS Aura

    NASA Technical Reports Server (NTRS)

    Fisher, Dominic

    2016-01-01

    Presentation at the 24797-16 Earth Observing System (EOS) Aura Science Team Meeting (Mission Operations Work Group (MOWG)) at Rotterdam, Netherlands August 29, 2016. Presentation topics include mission summary, spacecraft subsystems summary, recent and planned activities, spacecraft anomalies, data capture, propellant usage and lifetime estimates, spacecraft maneuvers and ground track history, mission highlights and past spacecraft anomalies and reliability estimates.

  3. Information Systems Development--ISD '94. Methods & Tools. Theory & Practice. Proceedings of the International Conference (4th, Bled, Slovenia, September 20-22, 1994).

    ERIC Educational Resources Information Center

    Zupancic, Joze, Ed.; Wrycza, Stanislaw, Ed.

    These proceedings present 3 invited papers, 65 submitted papers, and 17 presentations on work in progress that were given at the Fourth International Conference on Information Systems Development. The three invited papers are: "Information Systems Planning in Small Business" (Georgios Doukidis, Panagiotis Lybereas, Robert D. Galliers);…

  4. Albeni Falls Wildlife Mitigation : Annual Report 2002.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Terra-Berns, Mary

    The Albeni Falls Interagency Work Group continued to actively engage in implementing wildlife mitigation actions in 2002. Regular Work Group meetings were held to discuss budget concerns affecting the Albeni Falls Wildlife Mitigation Program, to present potential acquisition projects, and to discuss and evaluate other issues affecting the Work Group and Project. Work Group members protected 1,386.29 acres of wildlife habitat in 2002. To date, the Albeni Falls project has protected approximately 5,914.31 acres of wildlife habitat. About 21% of the total wildlife habitat lost has been mitigated. Administrative activities have increased as more properties are purchased and continue tomore » center on restoration, operation and maintenance, and monitoring. In 2001, Work Group members focused on development of a monitoring and evaluation program as well as completion of site-specific management plans. This year the Work Group began implementation of the monitoring and evaluation program performing population and plant surveys, data evaluation and storage, and map development as well as developing management plans. Assuming that the current BPA budget restrictions will be lifted in the near future, the Work Group expects to increase mitigation properties this coming year with several potential projects.« less

  5. Architectural Illusion.

    ERIC Educational Resources Information Center

    Doornek, Richard R.

    1990-01-01

    Presents a lesson plan developed around the work of architectural muralist Richard Haas. Discusses the significance of mural painting and gives key concepts for the lesson. Lists class activities for the elementary and secondary grades. Provides a photograph of the Haas mural on the Fountainbleau Hilton Hotel, 1986. (GG)

  6. Women in physics in Albania

    NASA Astrophysics Data System (ADS)

    Deda, Antoneta

    2013-03-01

    A study is presented about women physicists in Albania, their problems, their achievements, the work done by the Women in Physics Group in Albania, the difficulties of attracting more girls to the field of physics, and plans and projects for the future to improve the situation.

  7. Environmental Learning Centers: A Template.

    ERIC Educational Resources Information Center

    Vozick, Eric

    1999-01-01

    Provides a working model, or template, for community-based environmental learning centers (ELCs). The template presents a philosophy as well as a plan for staff and administration operations, educational programming, and financial support. The template also addresses "green" construction and maintenance of buildings and grounds and…

  8. Aircraft Noise Reduction Subproject Overview

    NASA Technical Reports Server (NTRS)

    Fernandez, Hamilton; Nark, Douglas M.; Van Zante, Dale E.

    2016-01-01

    The material presents highlights of propulsion and airframe noise research being completed for the Advanced Air Transport Technology Project. The basis of noise reduction plans along with representative work for the airframe, propulsion, and propulsion-airframe integration is discussed for the Aircraft Noise reduction Subproject.

  9. Integrated corridor management initiative : demonstration phase evaluation, San Diego technical capability analysis test plan.

    DOT National Transportation Integrated Search

    1998-11-01

    The purpose of this working paper is to present estimates of potential safety benefits resulting from full implementation of Intelligent Transportation Systems (ITS) in the United States. These estimates were derived by integrating results from a num...

  10. Reports of planetary astronomy, 1986

    NASA Technical Reports Server (NTRS)

    1987-01-01

    A compilation of abstracts of reports from Principal Investigators funded through NASA's Planetary Astronomy Program, Office of Space Science and Applications, is presented. The purpose is to provide a document which succinctly summarizes work conducted in this program for 1986. Each report contains a brief statement on the strategy of investigation and lists significant accomplishments within the area of the author's funded grant or contract, plans for future work, and publications.

  11. GLOBE and the Earth SySTEM Model in Teacher Preparation

    NASA Astrophysics Data System (ADS)

    Jabot, M.; Moore, J.; Dorofy, P.

    2017-12-01

    This presentation will share the growing body of work linking ArcMap and GLOBE and the Earth SySTEM approach in the development of preservice teachers. Our work is linking the power of ArcMap with the vast database of GLOBE in a unique way that links the power of geospatial technologies in shaping the planning for and delivery of science instruction in the P-5 classroom.

  12. Toward an Evaluation Framework for Doctoral Education in Social Work: A 10-Year Retrospective of One PhD Program's Assessment Experiences

    ERIC Educational Resources Information Center

    Bentley, Kia J.

    2013-01-01

    This article presents a framework for evaluation in social work doctoral education and details 10 years of successes and challenges in one PhD program's use of the framework, including planning and implementing specific assessment activities around student learning outcomes and larger program goals. The article argues that a range of…

  13. Military Social Work: Opportunities and Challenges for Social Work Education

    PubMed Central

    Wooten, Nikki R.

    2015-01-01

    Military social work is a specialized field of practice spanning the micro-macro continuum and requiring advanced social work knowledge and skills. The complex behavioral health problems and service needs of Iraq and Afghanistan veterans highlight the need for highly trained social work professionals who can provide militarily-relevant and culturally-responsive evidence-informed services. Responding to the military behavioral health workforce and service needs of recently returned veterans presents both opportunities and challenges for military social work education. This article discusses the rationale for a military social work specialization, the need for military social work education, and opportunities and challenges for social work education. An integrated model of intellectual capital is proposed to guide strategic planning for future military social work education. PMID:26089628

  14. Creating a Lunar EVA Work Envelope

    NASA Technical Reports Server (NTRS)

    Griffin, Brand N.; Howard, Robert; Rajulu, Sudhakar; Smitherman, David

    2009-01-01

    A work envelope has been defined for weightless Extravehicular Activity (EVA) based on the Space Shuttle Extravehicular Mobility Unit (EMU), but there is no equivalent for planetary operations. The weightless work envelope is essential for planning all EVA tasks because it determines the location of removable parts, making sure they are within reach and visibility of the suited crew member. In addition, using the envelope positions the structural hard points for foot restraints that allow placing both hands on the job and provides a load path for reacting forces. EVA operations are always constrained by time. Tasks are carefully planned to ensure the crew has enough breathing oxygen, cooling water, and battery power. Planning first involves computers using a virtual work envelope to model tasks, next suited crew members in a simulated environment refine the tasks. For weightless operations, this process is well developed, but planetary EVA is different and no work envelope has been defined. The primary difference between weightless and planetary work envelopes is gravity. It influences anthropometry, horizontal and vertical mobility, and reaction load paths and introduces effort into doing "overhead" work. Additionally, the use of spacesuits other than the EMU, and their impacts on range of motion, must be taken into account. This paper presents the analysis leading to a concept for a planetary EVA work envelope with emphasis on lunar operations. There is some urgency in creating this concept because NASA has begun building and testing development hardware for the lunar surface, including rovers, habitats and cargo off-loading equipment. Just as with microgravity operations, a lunar EVA work envelope is needed to guide designers in the formative stages of the program with the objective of avoiding difficult and costly rework.

  15. SU-E-T-628: A Cloud Computing Based Multi-Objective Optimization Method for Inverse Treatment Planning.

    PubMed

    Na, Y; Suh, T; Xing, L

    2012-06-01

    Multi-objective (MO) plan optimization entails generation of an enormous number of IMRT or VMAT plans constituting the Pareto surface, which presents a computationally challenging task. The purpose of this work is to overcome the hurdle by developing an efficient MO method using emerging cloud computing platform. As a backbone of cloud computing for optimizing inverse treatment planning, Amazon Elastic Compute Cloud with a master node (17.1 GB memory, 2 virtual cores, 420 GB instance storage, 64-bit platform) is used. The master node is able to scale seamlessly a number of working group instances, called workers, based on the user-defined setting account for MO functions in clinical setting. Each worker solved the objective function with an efficient sparse decomposition method. The workers are automatically terminated if there are finished tasks. The optimized plans are archived to the master node to generate the Pareto solution set. Three clinical cases have been planned using the developed MO IMRT and VMAT planning tools to demonstrate the advantages of the proposed method. The target dose coverage and critical structure sparing of plans are comparable obtained using the cloud computing platform are identical to that obtained using desktop PC (Intel Xeon® CPU 2.33GHz, 8GB memory). It is found that the MO planning speeds up the processing of obtaining the Pareto set substantially for both types of plans. The speedup scales approximately linearly with the number of nodes used for computing. With the use of N nodes, the computational time is reduced by the fitting model, 0.2+2.3/N, with r̂2>0.99, on average of the cases making real-time MO planning possible. A cloud computing infrastructure is developed for MO optimization. The algorithm substantially improves the speed of inverse plan optimization. The platform is valuable for both MO planning and future off- or on-line adaptive re-planning. © 2012 American Association of Physicists in Medicine.

  16. Request for Correction 15003 - Information Quality Act request for Correction of the TSCA Work Plan

    EPA Pesticide Factsheets

    This RFC concerns the Information Quality Act request for correction of the TSCA Work Plan for Chemical Assessments: 20154 Update and the TSCA Work Plan Chemicals: Methods Document (February 2012) regarding assessment of phthalic anhydride

  17. WE-AB-202-01: Evaluating the Toxicity Reduction with CT-Ventilation Functional Avoidance Radiation Therapy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vinogradskiy, Y; Miyasaka, Y; Kadoya, N

    Purpose: CT-ventilation is an exciting new imaging modality that uses 4DCTs to calculate lung ventilation. Studies have proposed to use 4DCT-ventilation imaging for functional avoidance radiotherapy which implies designing treatment plans to spare functional portions of the lung. Although retrospective studies have been performed to evaluate the dosimetric gains to functional lung; no work has been done to translate the dosimetric gains to an improvement in pulmonary toxicity. The purpose of our work was to evaluate the potential reduction in toxicity for 4DCT-ventilation based functional avoidance. Methods: 70 lung cancer patients with 4DCT imaging were used for the study. CT-ventilationmore » maps were calculated using the patient’s 4DCT, deformable image registrations, and a density-change-based algorithm. Radiation pneumonitis was graded using imaging and clinical information. Log-likelihood methods were used to fit a normal-tissue-complication-probability (NTCP) model predicting grade 2+ radiation pneumonitis as a function of doses (mean and V20) to functional lung (>15% ventilation). For 20 patients a functional plan was generated that reduced dose to functional lung while meeting RTOG 0617-based constraints. The NTCP model was applied to the functional plan to determine the reduction in toxicity with functional planning Results: The mean dose to functional lung was 16.8 and 17.7 Gy with the functional and clinical plans respectively. The corresponding grade 2+ pneumonitis probability was 26.9% with the clinically-used plan and 24.6% with the functional plan (8.5% reduction). The V20-based grade 2+ pneumonitis probability was 23.7% with the clinically-used plan and reduced to 19.6% with the functional plan (20.9% reduction). Conclusion: Our results revealed a reduction of 9–20% in complication probability with functional planning. To our knowledge this is the first study to apply complication probability to convert dosimetric results to toxicity improvement. The results presented in the current work provide seminal data for prospective clinical trials in functional avoidance. YV discloses funding from State of Colorado. TY discloses National Lung Cancer Partnership; Young Investigator Research grant.« less

  18. Social Work Education Planning & Assessment System: Handbook of Fundamental Assessment Concepts; Manual for Project Managers; Appendices.

    ERIC Educational Resources Information Center

    Social and Rehabilitation Service (DHEW), Washington, DC.

    The Social Work Education Planning and Assessment (SWEPA) System is an information system designed to function within social work education toward two main purposes: (1) to help schools more effectively specify their own educational objectives, plan their social work education projects to achieve these objectives, mark their progress toward this…

  19. 23 CFR 420.111 - What are the documentation requirements for use of FHWA planning and research funds?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... and subrecipients in a work program, or other document that describes the work to be accomplished... various combinations, or brought together as a single work program. The expenditure of PL funds for transportation planning outside of metropolitan planning areas under § 420.109(d) may be included in the work...

  20. Current employment characteristics and career intentions of Lithuanian dentists.

    PubMed

    Janulyte, Vilija; Aleksejuniene, Jolanta; Puriene, Alina; Peciuliene, Vytaute; Benzian, Habib

    2014-12-20

    The present survey explored the current employment profile and future career intentions of Lithuanian general dentists and specialists. A census sampling method was employed with data collected by means of a structured questionnaire that inquired about demographics, different employment-related aspects (practice type and location, working hours, perceived lack of patients, etc.), and future career intentions (intent to emigrate, to change profession, or the timing of retirement). The final response rate was 67.6% corresponding to 2,008 respondents. The majority of all dentists work full or part-time in the private dental sector, more than one third of them owns a private practice or rents a dental chair. A minority of dentists works in the public dental sector. According to the survey, 26.6% of general dentists and 39.2% of dental specialists works overtime (> 40 hours per week; P < 0.001) and practice in multiple clinics (1.4 ± 0.6 and 2.0 ± 1.2, respectively; P < 0.001). One third of general dentists (31.3%) and dental specialists (31.4%) stated to have a low number of patients (P > 0.05). The majority (68.9% of general dentists and 65.9% of dental specialists) plans to work after the retirement age (P > 0.05). Emigration as an option for their professional career is being considered by 10.8% of general dentists and 8.3% of dental specialists (P > 0.05). Working either full or part-time in private practices (OR = 4.3) and younger age (≤ 35 years; OR = 2.2) are the two strongest predictors for a perceived insufficient number of patients. One third of dentists in Lithuania work long hours and lack patients. Many dentists practice in multiple locations and plan to retire after the official retirement age. Some dentists and dental specialists plan to emigrate. The perceived shortcomings within the dental care system and workforce planning of dentists need to be addressed.

  1. UPWP Unified Planning Work Program

    DOT National Transportation Integrated Search

    1995-05-01

    The Unified Plannrng Work Program (UPWP) iS the planning document that guides the MPO staff in fulfilling its planning responstbilities for the upcoming year. Comprised of tasks that can be changed as the planning needs change. It is intended to serv...

  2. The Technical Work Plan Tracking Tool

    NASA Technical Reports Server (NTRS)

    Chullen, Cinda; Leighton, Adele; Weller, Richard A.; Woodfill, Jared; Parkman, William E.; Ellis, Glenn L.; Wilson, Marilyn M.

    2003-01-01

    The Technical Work Plan Tracking Tool is a web-based application that enables interactive communication and approval of contract requirements that pertain to the administration of the Science, Engineering, Analysis, and Test (SEAT) contract at Johnson Space Center. The implementation of the application has (1) shortened the Technical Work Plan approval process, (2) facilitated writing and documenting requirements in a performance-based environment with associated surveillance plans, (3) simplified the contractor s estimate of the cost for the required work, and (4) allowed for the contractor to document how they plan to accomplish the work. The application is accessible to over 300 designated NASA and contractor employees via two Web sites. For each employee, the application regulates access according to the employee s authority to enter, view, and/or print out diverse information, including reports, work plans, purchase orders, and financial data. Advanced features of this application include on-line approval capability, automatic e-mail notifications requesting review by subsequent approvers, and security inside and outside the firewall.

  3. Instructional Resources: Issues in Public Sculpture.

    ERIC Educational Resources Information Center

    Hill, Julie Lasater; And Others

    1988-01-01

    Presents four lesson plans for teaching K-12 students about public sculpture and contemporary sculptors. Highlights the following works: "Playscapes" by Isamu Noguchi, "The Dallas Piece" by Henry Moore, "Old Glory" by Mark di Suvero, and "Face of the Earth" by Vito Acconci. Includes background information on…

  4. Road-Following Formation Control of Autonomous Ground Vehicles

    NASA Technical Reports Server (NTRS)

    Ono, Masahiro; Droge, Greg; Grip, Havard; Toupet, Olivier; Scrapper, Chris; Rahmani, Amir

    2015-01-01

    This work presents a novel cooperative path planning for formation keeping robots traversing along a road with obstacles and possible narrow passages. A unique challenge in this problem is a requirement for spatial and temporal coordination between vehicles while ensuring collision and obstacle avoidance.

  5. Home-based radiology transcription and a productivity pay plan.

    PubMed

    Kerr, K

    1997-01-01

    Shands Hospital in Gainesville, Fla., decided to evaluate the way it provided transcription services in its radiology department. It identified four goals: increased productivity, decreased operating expense, finding much needed space in the radiology department and increasing employee morale. The department performs 165,000 procedures annually, with 66 radiologists, 29 faculty, and 37 residents and fellows on staff. Six FTEs comprised the transcription pool in the radiology department, with transcription their only duty. Transcriptionists were paid an hourly rate based on their years of service, not their productivity. Evaluation and measurement studies were undertaken by the hospital's management systems engineering department. The transcriptionists' hours were then changed to provide coverage during the periods of heaviest dictation. The productivity level of the transcription staff was also measured and various methods of measurement reviewed. The goal was a pure incentive pay plan that would reward employees for every increase in productivity. The incentive pay plan was phased in over a three-month period. Transcriptionists were paid for work performed, with no base pay beyond minimum wage. The move to home-based transcription was planned. The necessary equipment was identified and various issues specific to working at home were addressed. Approximately six months later, the transcriptionists were set up to work at home. The astounding results achieved are presented: 28% increase in productivity, operational cost savings exceeding $25,000 and a space savings of 238 square feet.

  6. Current-Sensitive Path Planning for an Underactuated Free-Floating Ocean Sensorweb

    NASA Technical Reports Server (NTRS)

    Dahl, Kristen P.; Thompson, David R.; McLaren, David; Chao, Yi; Chien, Steve

    2011-01-01

    This work investigates multi-agent path planning in strong, dynamic currents using thousands of highly under-actuated vehicles. We address the specific task of path planning for a global network of ocean-observing floats. These submersibles are typified by the Argo global network consisting of over 3000 sensor platforms. They can control their buoyancy to float at depth for data collection or rise to the surface for satellite communications. Currently, floats drift at a constant depth regardless of the local currents. However, accurate current forecasts have become available which present the possibility of intentionally controlling floats' motion by dynamically commanding them to linger at different depths. This project explores the use of these current predictions to direct float networks to some desired final formation or position. It presents multiple algorithms for such path optimization and demonstrates their advantage over the standard approach of constant-depth drifting.

  7. Consultative meeting considers past successes and future programmes for subregional network.

    PubMed

    1999-01-01

    This article presents the proceedings of the consultative meeting held in Beijing during October 18-19, 1999. Representatives from the population information (POPIN) centers in China, Indonesia, Lao People's Democratic Republic, Malaysia, Mongolia, Myanmar, Philippines, Republic of Korea, Thailand, and Vietnam participated in the meeting. The major objectives were to exchange and share experiences among the network members and to draw up a cooperative work plan for carrying out information activities more effectively in the coming year and beyond. Highlights of the meeting include the presentation of the results of an Asia-Pacific POPIN survey, which evaluated information technology (IT) capabilities among members and evaluation of the 1999 IT-focused training workshop; a review of POPIN activities conducted by the subregional network's members in the past year; and a discussion of major topics for cooperative activities. Moreover, a work plan was formulated for the East and South-East Asia POPIN subregional network for October 1999-October 2000.

  8. A framework for learning and planning against switching strategies in repeated games

    NASA Astrophysics Data System (ADS)

    Hernandez-Leal, Pablo; Munoz de Cote, Enrique; Sucar, L. Enrique

    2014-04-01

    Intelligent agents, human or artificial, often change their behaviour as they interact with other agents. For an agent to optimise its performance when interacting with such agents, it must be capable of detecting and adapting according to such changes. This work presents an approach on how to effectively deal with non-stationary switching opponents in a repeated game context. Our main contribution is a framework for online learning and planning against opponents that switch strategies. We present how two opponent modelling techniques work within the framework and prove the usefulness of the approach experimentally in the iterated prisoner's dilemma, when the opponent is modelled as an agent that switches between different strategies (e.g. TFT, Pavlov and Bully). The results of both models were compared against each other and against a state-of-the-art non-stationary reinforcement learning technique. Results reflect that our approach obtains competitive results without needing an offline training phase, as opposed to the state-of-the-art techniques.

  9. Underground Test Area Activity Preemptive Review Guidance Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Farnham, Irene; Rehfeldt, Kenneth

    Preemptive reviews (PERs) of Underground Test Area (UGTA) Activity corrective action unit (CAU) studies are an important and long-maintained quality improvement process. The CAU-specific PER committees provide internal technical review of ongoing work throughout the CAU lifecycle. The reviews, identified in the UGTA Quality Assurance Plan (QAP) (Sections 1.3.5.1 and 3.2), assure work is comprehensive, accurate, in keeping with the state of the art, and consistent with CAU goals. PER committees review various products, including data, documents, software/codes, analyses, and models. PER committees may also review technical briefings including Federal Facility Agreement and Consent Order (FFACO)-required presentations to the Nevadamore » Division of Environmental Protection (NDEP) and presentations supporting key technical decisions (e.g., investigation plans and approaches). PER committees provide technical recommendations to support regulatory decisions that are the responsibility of the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) and NDEP.« less

  10. Present status and future of the sophisticated work station

    NASA Astrophysics Data System (ADS)

    Ishida, Haruhisa

    The excellency of the work station is explained, by comparing the functions of software and hardware of work station with those of personal computer. As one of the examples utilizing the functions of work station, desk top publishing is explained. By describing the competition between the Group of ATT · Sun Microsystems which intends to have the leadership by integrating Berkeley version which is most popular at this moment and System V version, and the group led by IBM, future of UNIX as OS of work station is predicted. Development of RISC processor, TRON Plan and Sigma Projects by MITI are also mentioned as its background.

  11. From analytic inversion to contemporary IMRT optimization: Radiation therapy planning revisited from a mathematical perspective

    PubMed Central

    Censor, Yair; Unkelbach, Jan

    2011-01-01

    In this paper we look at the development of radiation therapy treatment planning from a mathematical point of view. Historically, planning for Intensity-Modulated Radiation Therapy (IMRT) has been considered as an inverse problem. We discuss first the two fundamental approaches that have been investigated to solve this inverse problem: Continuous analytic inversion techniques on one hand, and fully-discretized algebraic methods on the other hand. In the second part of the paper, we review another fundamental question which has been subject to debate from the beginning of IMRT until the present day: The rotation therapy approach versus fixed angle IMRT. This builds a bridge from historic work on IMRT planning to contemporary research in the context of Intensity-Modulated Arc Therapy (IMAT). PMID:21616694

  12. Three-dimensional dose verification of the clinical application of gamma knife stereotactic radiosurgery using polymer gel and MRI.

    PubMed

    Papagiannis, P; Karaiskos, P; Kozicki, M; Rosiak, J M; Sakelliou, L; Sandilos, P; Seimenis, I; Torrens, M

    2005-05-07

    This work seeks to verify multi-shot clinical applications of stereotactic radiosurgery with a Leksell Gamma Knife model C unit employing a polymer gel-MRI based experimental procedure, which has already been shown to be capable of verifying the precision and accuracy of dose delivery in single-shot gamma knife applications. The treatment plan studied in the present work resembles a clinical treatment case of pituitary adenoma using four 8 mm and one 14 mm collimator helmet shots to deliver a prescription dose of 15 Gy to the 50% isodose line (30 Gy maximum dose). For the experimental dose verification of the treatment plan, the same criteria as those used in the clinical treatment planning evaluation were employed. These included comparison of measured and GammaPlan calculated data, in terms of percentage isodose contours on axial, coronal and sagittal planes, as well as 3D plan evaluation criteria such as dose-volume histograms for the target volume, target coverage and conformity indices. Measured percentage isodose contours compared favourably with calculated ones despite individual point fluctuations at low dose contours (e.g., 20%) mainly due to the effect of T2 measurement uncertainty on dose resolution. Dose-volume histogram data were also found in a good agreement while the experimental results for the percentage target coverage and conformity index were 94% and 1.17 relative to corresponding GammaPlan calculations of 96% and 1.12, respectively. Overall, polymer gel results verified the planned dose distribution within experimental uncertainties and uncertainty related to the digitization process of selected GammaPlan output data.

  13. Turbine Engine Hot Section Technology (HOST)

    NASA Technical Reports Server (NTRS)

    1983-01-01

    A two-day workshop on the research and plans for turbine engine hot section durability problems was held on October 25 and 26, 1983, at the NASA Lewis Research Center. Presentations were made during six sessions, including structural analysis, fatigue and fracture, surface protective coatings, combustion, turbine heat transfer, and instrumentation, that dealt with the thermal and fluid environment around liners, blades, and vanes, and with material coatings, constitutive behavior, stress-strain response, and life prediction methods for the three components. The principal objective of each session was to disseminate the research results to date, along with future plans, in each of the six areas. Contract and government researchers presented results of their work.

  14. Creating Your Life's Work Portfolio. An Interactive Career and Life Planning Workbook.

    ERIC Educational Resources Information Center

    1998

    Designed for those beginning a working life or with years of experience, this book leads the user through collecting records that document work history and affirm successes. It provides a step-by-step process to help plan one's life's work, make career decisions, and develop plans for new career directions and a structure to learn career planning…

  15. Exploring Occupational and Behavioral Risk Factors for Obesity in Firefighters: A Theoretical Framework and Study Design

    PubMed Central

    Schnall, Peter; Dobson, Marnie; Israel, Leslie; Landsbergis, Paul; Galassetti, Pietro; Pontello, Andria; Kojaku, Stacey; Baker, Dean

    2011-01-01

    Firefighters and police officers have the third highest prevalence of obesity among 41 male occupational groups in the United States (US). However, few studies have examined the relationship of firefighter working conditions and health behaviors with obesity. This paper presents a theoretical framework describing the relationship between working conditions, health behaviors, and obesity in firefighters. In addition, the paper describes a detailed study plan for exploring the role of occupational and behavioral risk factors in the development of obesity in firefighters enrolled in the Orange County Fire Authority Wellness Fitness Program. The study plan will be described with emphasis on its methodological merits: adopting a participatory action research approach, developing a firefighter-specific work and health questionnaire, conducting both a cross-sectional epidemiological study using the questionnaire and a sub-study to assess the validity of the questionnaire with dietary intake and physical activity measures, and evaluating the strengths and weaknesses of the body mass index as an obesity measure in comparison to skinfold-based percent body fat. The study plan based on a theoretical framework can be an essential first step for establishing effective intervention programs for obesity among professional and voluntary firefighters. PMID:22953214

  16. Exploring occupational and behavioral risk factors for obesity in firefighters: a theoretical framework and study design.

    PubMed

    Choi, Bongkyoo; Schnall, Peter; Dobson, Marnie; Israel, Leslie; Landsbergis, Paul; Galassetti, Pietro; Pontello, Andria; Kojaku, Stacey; Baker, Dean

    2011-12-01

    Firefighters and police officers have the third highest prevalence of obesity among 41 male occupational groups in the United States (US). However, few studies have examined the relationship of firefighter working conditions and health behaviors with obesity. This paper presents a theoretical framework describing the relationship between working conditions, health behaviors, and obesity in firefighters. In addition, the paper describes a detailed study plan for exploring the role of occupational and behavioral risk factors in the development of obesity in firefighters enrolled in the Orange County Fire Authority Wellness Fitness Program. The study plan will be described with emphasis on its methodological merits: adopting a participatory action research approach, developing a firefighter-specific work and health questionnaire, conducting both a cross-sectional epidemiological study using the questionnaire and a sub-study to assess the validity of the questionnaire with dietary intake and physical activity measures, and evaluating the strengths and weaknesses of the body mass index as an obesity measure in comparison to skinfold-based percent body fat. The study plan based on a theoretical framework can be an essential first step for establishing effective intervention programs for obesity among professional and voluntary firefighters.

  17. Effectiveness of participatory training for the promotion of work-related health and safety among Korean farmers

    PubMed Central

    KIM, Jin-Seok; YOON, Seong-Yong; CHO, Seong-Yong; KIM, Sang-Kyu; CHUNG, In-Sung; SHIN, Hyeong-Soo

    2017-01-01

    This study was conducted to explore the effectiveness of participatory training for promoting farmer’s health and reducing agricultural work-related injuries. Candidates for this study included 595 farmers in 8 rural villages of South Korea. The one-day course participatory training was administered to 217 (36.5%) farmers and included an action-checklist, a good example presentation, and group discussion. The follow-up visit to participants’ houses and farms was performed after 1 to 3 months. A direct interview survey was administered pre- and post-trainings. The total number of proposed action plans for the improvement of working condition was 620. It was observed that 61.5% of action plans (72.2% of short term and 41.3% of long term plans) were completely implemented. In regards to health and safety indices, the proportion of current smokers was reduced from 29.8% to 25.3% in the group that underwent training. The pesticide intoxication was reduced from 16.1% to 4.8% in participants that underwent training. However, the agricultural injury rate was unchanged in both groups. This study reports significant beneficial effects of participatory training in the agriculture sector in Korea. PMID:28484146

  18. Membership theory, rationalism, and the claim to adequacy in health services.

    PubMed

    Falck, H S

    1997-01-01

    The immediate, practical purpose of this paper is to discuss and elaborate upon the concept of adequacy, especially when applicable to an understanding of the social work role in health policy making. The relevant topics under the general category of adequacy are (1) the perception and definition of the citizen/client; (2) the concept of rationality in health planning broken down into conditionality and prioritization, and (3) the concept of adequacy itself. Each will be addressed from the standpoint of recent experience and what may be done in the future to clarify and rationalize each. Clarity about clients, about rational approaches to policy making and planning, leading to a clear idea about adequacy in health care are presented as the indispensable elements in social work. Conditionality and prioritization are significant because no society will bring within equal reach of all members the benefits of health care, which usually means that health care is not rendered arbitrarily but as a result, among other things, of rational planning.

  19. Early Origins of Child Obesity: Bridging Disciplines and Phases of Development - September 30–October 1, 2010

    PubMed Central

    Christoffel, Katherine Kaufer; Wang, Xiaobin; Binns, Helen J.

    2012-01-01

    This report summarizes a conference: “Early Origins of Child Obesity: Bridging Disciplines and Phases of Development”, held in Chicago on September 30–October 1, 2010. The conference was funded in part by the National Institutes of Health and the Williams Heart Foundation, to achieve the conference objective: forging a next-step research agenda related to the early origins of childhood obesity. This research agenda was to include working with an array of factors (from genetic determinants to societal ones) along a continuum from prenatal life to age 7, with an emphasis on how the developing child deals with the challenges presented by his/her environment (prenatal, parental, nutritional, etc.). The conference offered a unique opportunity to facilitate communication and planning of future work among a variety of researchers whose work separately addresses different periods in early life. Over the span of two days, speakers addressed existing, critical research topics within each of the most-studied age ranges. On the final day, workshops fostered the discussion needed to identify the highest priority research topics related to linking varied early factor domains. These are presented for use in planning future research and research funding. PMID:23443002

  20. FY17 Strategic Themes.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Leland, Robert W.

    2017-03-01

    I am pleased to present this summary of the FY17 Division 1000 Science and Technology Strategic Plan. As this plan represents a continuation of the work we started last year, the four strategic themes (Mission Engagement, Bold Outcomes, Collaborative Environment, and Safety Imperative) remain the same, along with many of the goals. You will see most of the changes in the actions listed for each goal: We completed some actions, modified others, and added a few new ones. As I’ve stated previously, this is not a strategy to be pursued in tension with the Laboratory strategic plan. The Division 1000more » strategic plan is intended to chart our course as we strive to contribute our very best in service of the greater Laboratory strategy. I welcome your feedback and look forward to our dialogue about these strategic themes. Please join me as we move forward to implement the plan in the coming months.« less

  1. Market-Based Approaches to Managing Science Return from Planetary Missions

    NASA Technical Reports Server (NTRS)

    Wessen, Randii R.; Porter, David; Hanson, Robin

    1996-01-01

    A research plan is described for the design and testing of a method for the planning and negotiation of science observations. The research plan is presented in relation to the fact that the current method, which involves a hierarchical process of science working groups, is unsuitable for the planning of the Cassini mission. The research plan involves the market-based approach in which participants are allocated budgets of scheduling points. The points are used to provide an intensity of preference for the observations being scheduled. In this way, the schedulers do not have to limit themselves to solving major conflicts, but try to maximize the number of scheduling points that result in a conflict-free timeline. Incentives are provided for the participants by the fixed budget concerning their tradeoff decisions. A degree of feedback is provided in the process so that the schedulers may rebid based on the current timeline.

  2. 40 CFR 35.418 - Award limitations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... STATE AND LOCAL ASSISTANCE Environmental Program Grants Water Quality Management Planning Grants... State agency: (a) Unless the agency develops its work plan jointly with local, regional and interstate... planning organizations to carry out portions of that work plan. (b) Unless the agency reports annually on...

  3. 40 CFR 35.418 - Award limitations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... STATE AND LOCAL ASSISTANCE Environmental Program Grants Water Quality Management Planning Grants... State agency: (a) Unless the agency develops its work plan jointly with local, regional and interstate... planning organizations to carry out portions of that work plan. (b) Unless the agency reports annually on...

  4. 40 CFR 35.418 - Award limitations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... STATE AND LOCAL ASSISTANCE Environmental Program Grants Water Quality Management Planning Grants... State agency: (a) Unless the agency develops its work plan jointly with local, regional and interstate... planning organizations to carry out portions of that work plan. (b) Unless the agency reports annually on...

  5. Towards a Holistic Framework for the Evaluation of Emergency Plans in Indoor Environments

    PubMed Central

    Serrano, Emilio; Poveda, Geovanny; Garijo, Mercedes

    2014-01-01

    One of the most promising fields for ambient intelligence is the implementation of intelligent emergency plans. Because the use of drills and living labs cannot reproduce social behaviors, such as panic attacks, that strongly affect these plans, the use of agent-based social simulation provides an approach to evaluate these plans more thoroughly. (1) The hypothesis presented in this paper is that there has been little interest in describing the key modules that these simulators must include, such as formally represented knowledge and a realistic simulated sensor model, and especially in providing researchers with tools to reuse, extend and interconnect modules from different works. This lack of interest hinders researchers from achieving a holistic framework for evaluating emergency plans and forces them to reconsider and to implement the same components from scratch over and over. In addition to supporting this hypothesis by considering over 150 simulators, this paper: (2) defines the main modules identified and proposes the use of semantic web technologies as a cornerstone for the aforementioned holistic framework; (3) provides a basic methodology to achieve the framework; (4) identifies the main challenges; and (5) presents an open and free software tool to hint at the potential of such a holistic view of emergency plan evaluation in indoor environments. PMID:24662453

  6. JPL Facilities and Software for Collaborative Design: 1994 - Present

    NASA Technical Reports Server (NTRS)

    DeFlorio, Paul A.

    2004-01-01

    The viewgraph presentation provides an overview of the history of the JPL Project Design Center (PDC) and, since 2000, the Center for Space Mission Architecture and Design (CSMAD). The discussion includes PDC objectives and scope; mission design metrics; distributed design; a software architecture timeline; facility design principles; optimized design for group work; CSMAD plan view, facility design, and infrastructure; and distributed collaboration tools.

  7. Have You Ever Been to the Shore Before? A Marine Education Infusion Unit. Northern New England Marine Education Project.

    ERIC Educational Resources Information Center

    Maine Univ., Orono. Coll. of Education.

    This unit presents the teacher with guidelines and suggestions for a field trip to a shore. It contains information about what organisms and habitat to expect and appropriate activities. Also suggested are discussions of the people who live and work near the shore. A pre-trip planning section is presented. Sections relating to each of several…

  8. Summary Report of the Title VI-G Network Third Annual Conference. (Minneapolis, Minnesota, December 5-8, 1977).

    ERIC Educational Resources Information Center

    Network of Innovative Schools, Inc., Andover, MA.

    Presented is the summary report of the Third Annual Conference of the Title VI-G Network which was designed to update learning disability (LD) professionals on pertinent program and education developments, to inform them of future trends and plans, and to offer concrete help in their present work. Introductory sections provide a schedule of the…

  9. Inexpensive and Easily Made Instructional Materials: A Training Manual for Teachers and Parents for Working with Preschool Children.

    ERIC Educational Resources Information Center

    Kutac, Ethel M., Comp.

    Intended for use in parent education activities, the manual presents guidelines for making 24 instructional toys and lesson plans for using the toys with preschool handicapped children. Each toy is presented in terms of an illustration, a list of specific skills to be developed by the child using the toy, materials needed, time required to make…

  10. System analysis study of space platform and station accommodations for life sciences research facilities. Volume 2: Study results. Appendix E: Work breakdown structure and dictionary

    NASA Technical Reports Server (NTRS)

    Wiley, Lowell F.

    1985-01-01

    A work breakdown structure for the Space Station Life Sciences Research Facility (LSRF) is presented up to level 5. The purpose is to provide the framework for task planning and control and to serve as a basis for budgeting, task assignment, cost collection and report, and contractual performance measurement and tracking of the Full Scale Development Phase tasks.

  11. 40 CFR 63.306 - Work practice standards.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Standards for Coke Oven Batteries § 63.306 Work practice standards. (a) Work practice plan. On or before... plan for each coke oven battery. The plan shall be designed to achieve compliance with visible emission limitations for coke oven doors, topside port lids, offtake systems, and charging operations under this...

  12. 40 CFR 63.306 - Work practice standards.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... for Coke Oven Batteries § 63.306 Work practice standards. (a) Work practice plan. On or before... plan for each coke oven battery. The plan shall be designed to achieve compliance with visible emission limitations for coke oven doors, topside port lids, offtake systems, and charging operations under this...

  13. 40 CFR 63.306 - Work practice standards.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Standards for Coke Oven Batteries § 63.306 Work practice standards. (a) Work practice plan. On or before... plan for each coke oven battery. The plan shall be designed to achieve compliance with visible emission limitations for coke oven doors, topside port lids, offtake systems, and charging operations under this...

  14. 40 CFR 63.306 - Work practice standards.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Standards for Coke Oven Batteries § 63.306 Work practice standards. (a) Work practice plan. On or before... plan for each coke oven battery. The plan shall be designed to achieve compliance with visible emission limitations for coke oven doors, topside port lids, offtake systems, and charging operations under this...

  15. 77 FR 44216 - Mid-Atlantic Fishery Management Council (MAFMC); Public Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-27

    ..., 2012--The Visioning and Strategic Planning Working Group (facilitated by Adam R. Saslow, Senior.... SUMMARY: The Mid-Atlantic Fishery Management Council (Council) and its Strategic Planning Working Group... INFORMATION: Monday, August 13, 2012 9 a.m. until 5 p.m.--The Visioning and Strategic Planning Working Group...

  16. Work plan for the radiological survey for the David Witherspoon, Incorporated, Landfill-1630 site, Knoxville, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-07-01

    This work plan establishes the methods and requirements for performing a radiological survey at the David Witherspoon, Incorporated, Landfill-1630 Site, Knoxville, Tennessee (DWI 1630 Site) in accordance with requirements under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The radiological survey will identify the radiological contamination level of the equipment and debris stored at the DWI 1630 Site. The data generated from the survey activities will support the decisions for characterization of the equipment/debris and aid in subsequent disposition and waste handling. The survey activities to be performed under this work plan include an equipment radiological survey,more » a walkover survey, and an immunoassay testing for polychlorinated biphenyls (PCBs). This work plan includes a quality assurance (QA)/quality control (QC) project plan, a health and safety (H&S) plan, and a waste management plan.« less

  17. Planning Staff and Space Capacity Requirements during Wartime.

    PubMed

    Kepner, Elisa B; Spencer, Rachel

    2016-01-01

    Determining staff and space requirements for military medical centers can be challenging. Changing patient populations change the caseload requirements. Deployment and assignment rotations change the experience and education of clinicians and support staff, thereby changing the caseload capacity of a facility. During wartime, planning becomes increasingly more complex. What will the patient mix and caseload volume be by location? What type of clinicians will be available and when? How many beds are needed at each facility to meet caseload demand and match clinician supply? As soon as these factors are known, operations are likely to change and planning factors quickly become inaccurate. Soon, more beds or staff are needed in certain locations to meet caseload demand while other locations retain underutilized staff, waiting for additional caseload fluctuations. This type of complexity challenges the best commanders. As in so many other industries, supply and demand principles apply to military health, but very little is stable about military health capacity planning. Planning analysts build complex statistical forecasting models to predict caseload based on historical patterns. These capacity planning techniques work best in stable repeatable processes where caseload and staffing resources remain constant over a long period of time. Variability must be simplified to predict complex operations. This is counterintuitive to the majority of capacity planners who believe more data drives better answers. When the best predictor of future needs is not historical patterns, traditional capacity planning does not work. Rather, simplified estimation techniques coupled with frequent calibration adjustments to account for environmental changes will create the most accurate and most useful capacity planning and management system. The method presented in this article outlines the capacity planning approach used to actively manage hospital staff and space during Operations Iraqi Freedom and Enduring Freedom.

  18. Lunar Dust Mitigation Technology Development

    NASA Technical Reports Server (NTRS)

    Hyatt, Mark J.; Deluane, Paul B.

    2008-01-01

    NASA s plans for implementing the Vision for Space Exploration include returning to the moon as a stepping stone for further exploration of Mars, and beyond. Dust on the lunar surface has a ubiquitous presence which must be explicitly addressed during upcoming human lunar exploration missions. While the operational challenges attributable to dust during the Apollo missions did not prove critical, the comparatively long duration of impending missions presents a different challenge. Near term plans to revisit the moon places a primary emphasis on characterization and mitigation of lunar dust. Comprised of regolith particles ranging in size from tens of nanometers to microns, lunar dust is a manifestation of the complex interaction of the lunar soil with multiple mechanical, electrical, and gravitational effects. The environmental and anthropogenic factors effecting the perturbation, transport, and deposition of lunar dust must be studied in order to mitigate it s potentially harmful effects on exploration systems. This paper presents the current perspective and implementation of dust knowledge management and integration, and mitigation technology development activities within NASA s Exploration Technology Development Program. This work is presented within the context of the Constellation Program s Integrated Lunar Dust Management Strategy. The Lunar Dust Mitigation Technology Development project has been implemented within the ETDP. Project scope and plans will be presented, along with a a perspective on lessons learned from Apollo and forensics engineering studies of Apollo hardware. This paper further outlines the scientific basis for lunar dust behavior, it s characteristics and potential effects, and surveys several potential strategies for its control and mitigation both for lunar surface operations and within the working volumes of a lunar outpost.

  19. WEC-SIM Validation Testing Plan FY14 Q4.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ruehl, Kelley Michelle

    2016-02-01

    The WEC-Sim project is currently on track, having met both the SNL and NREL FY14 Milestones, as shown in Table 1 and Table 2. This is also reflected in the Gantt chart uploaded to the WEC-Sim SharePoint site in the FY14 Q4 Deliverables folder. The work completed in FY14 includes code verification through code-to-code comparison (FY14 Q1 and Q2), preliminary code validation through comparison to experimental data (FY14 Q2 and Q3), presentation and publication of the WEC-Sim project at OMAE 2014 [1], [2], [3] and GMREC/METS 2014 [4] (FY14 Q3), WEC-Sim code development and public open-source release (FY14 Q3), andmore » development of a preliminary WEC-Sim validation test plan (FY14 Q4). This report presents the preliminary Validation Testing Plan developed in FY14 Q4. The validation test effort started in FY14 Q4 and will go on through FY15. Thus far the team has developed a device selection method, selected a device, and placed a contract with the testing facility, established several collaborations including industry contacts, and have working ideas on the testing details such as scaling, device design, and test conditions.« less

  20. [Cellular transplantation laboratory: a new field of action for nurses].

    PubMed

    Corradi, Maria Inês; da Silva, Sandra Honorato

    2008-01-01

    This article presents the experience of a nurse at a cellular transplantation laboratory. This laboratory goal is to isolate insulin producing cells for human transplantation. The nurse, as a member of an interdisciplinary team, took part in the planning of all work processes: working procedures and team training. The main activities under the nurse responsibilities include contamination control, on-the-job training and evaluation of the Quality of the procedures developed by the interdisciplinary team. Results have shown the effectiveness of the nurses' work in this new field.

Top