Sample records for work platforms lifting

  1. 76 FR 61750 - Vehicle-Mounted Elevating and Rotating Work Platforms (Aerial Lifts); Extension of the Office of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-05

    ...] Vehicle-Mounted Elevating and Rotating Work Platforms (Aerial Lifts); Extension of the Office of... requirement contained in the Standard on Vehicle-Mounted Elevating and Rotating Work Platforms (Aerial Lifts... by ensuring that aerial lifts are in safe operating condition. DATES: Comments must be submitted...

  2. Analysis of offshore platforms lifting with fixed pile structure type (fixed platform) based on ASD89

    NASA Astrophysics Data System (ADS)

    Sugianto, Agus; Indriani, Andi Marini

    2017-11-01

    Platform construction GTS (Gathering Testing Sattelite) is offshore construction platform with fix pile structure type/fixed platform functioning to support the mining of petroleum exploitation. After construction fabrication process platform was moved to barges, then shipped to the installation site. Moving process is generally done by pull or push based on construction design determined when planning. But at the time of lifting equipment/cranes available in the work area then the moving process can be done by lifting so that moving activity can be implemented more quickly of work. This analysis moving process of GTS platform in a different way that is generally done to GTS platform types by lifting using problem is construction reinforcement required, so the construction can be moved by lifting with analyzing and checking structure working stress that occurs due to construction moving process by lifting AISC code standard and analysis using the SAP2000 structure analysis program. The analysis result showed that existing condition cannot be moved by lifting because stress ratio is above maximum allowable value that is 0.950 (AISC-ASD89). Overstress occurs on the member 295 and 324 with stress ratio value 0.97 and 0.95 so that it is required structural reinforcement. Box plate aplication at both members so that it produces stress ratio values 0.78 at the member 295 and stress ratio of 0.77 at the member 324. These results indicate that the construction have qualified structural reinforcement for being moved by lifting.

  3. Platform C Installation

    NASA Image and Video Library

    2016-10-19

    A heavy-lift crane lifts the first half of the C-level work platforms, C south, for NASA’s Space Launch System (SLS) rocket, up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. Large Tandemloc bars have been attached to the platform to keep it level during lifting and installation. The C platform will be installed on the south side of High Bay 3. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  4. VAB Platform K(2) Lift & Install into Highbay 3

    NASA Image and Video Library

    2016-03-07

    A 250-ton crane is used to lift the second half of the K-level work platforms for NASA’s Space Launch System (SLS) rocket high above the transfer aisle inside the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. The platform is being lifted up for transfer into High Bay 3 for installation. The platform will be secured about 86 feet above the VAB floor, on tower E of the high bay. The K work platforms will provide access to the SLS core stage and solid rocket boosters during processing and stacking operations on the mobile launcher. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to High Bay 3 to support processing of the SLS and Orion spacecraft. A total of 10 levels of new platforms, 20 platform halves altogether, will surround the SLS rocket and Orion spacecraft.

  5. Platform C Installation

    NASA Image and Video Library

    2016-10-19

    A heavy-lift crane lifts the first half of the C-level work platforms, C south, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The C platform will be installed on the south side of High Bay 3. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  6. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    A heavy-lift crane lifts the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The C platform will be installed on the north side of High Bay 3. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  7. Platform C Installation

    NASA Image and Video Library

    2016-10-19

    A heavy-lift crane lifts the first half of the C-level work platforms, C south, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The C platform will be moved into High Bay 3 for installation on the south wall. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  8. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    A heavy-lift crane lifts the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The C platform will be installed on the north side of High Bay 3. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  9. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    A heavy-lift crane lifts the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The C platform will be moved into High Bay 3 for installation on the north wall. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  10. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    A heavy-lift crane lifts the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle of the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The C platform will be moved into High Bay 3 for installation on the north side of High Bay 3. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. In view below Platform C are several of the previously installed platforms. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  11. VAB Platform K(2) Lift & Install into Highbay 3

    NASA Image and Video Library

    2016-03-07

    Preparations are underway to lift the second half of the K-level work platforms for NASA’s Space Launch System (SLS) rocket up from High Bay 4 inside the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. The platform will be lifted up and over the transfer aisle and then lowered into High Bay 3 for installation. It will be secured about 86 feet above the VAB floor, on tower E of the high bay. The K work platforms will provide access to the SLS core stage and solid rocket boosters during processing and stacking operations on the mobile launcher. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to High Bay 3 to support processing of the SLS and Orion spacecraft. A total of 10 levels of new platforms, 20 platform halves altogether, will surround the SLS rocket and Orion spacecraft.

  12. VAB Platform K(2) Lift & Install into Highbay 3

    NASA Image and Video Library

    2016-03-07

    A 250-ton crane is used to lift the second half of the K-level work platforms for NASA’s Space Launch System (SLS) rocket up from High Bay 4 inside the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. The platform will be lifted up and over the transfer aisle and then lowered into High Bay 3 for installation. It will be secured about 86 feet above the VAB floor, on tower E of the high bay. The K work platforms will provide access to the SLS core stage and solid rocket boosters during processing and stacking operations on the mobile launcher. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to High Bay 3 to support processing of the SLS and Orion spacecraft. A total of 10 levels of new platforms, 20 platform halves altogether, will surround the SLS rocket and Orion spacecraft.

  13. VAB Platform K(2) Lift & Install into Highbay 3

    NASA Image and Video Library

    2016-03-07

    A 250-ton crane is used to lift the second half of the K-level work platforms for NASA’s Space Launch System (SLS) rocket up from High Bay 4 inside the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. The platform is being lifted up and over the transfer aisle and will be lowered into High Bay 3 for installation. It will be secured about 86 feet above the VAB floor, on tower E of the high bay. The K work platforms will provide access to the SLS core stage and solid rocket boosters during processing and stacking operations on the mobile launcher. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to High Bay 3 to support processing of the SLS and Orion spacecraft. A total of 10 levels of new platforms, 20 platform halves altogether, will surround the SLS rocket and Orion spacecraft.

  14. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    A heavy-lift crane lifts the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle of the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The C platform will be moved into High Bay 3 for installation on the north side of High Bay 3. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  15. 29 CFR 1910.67 - Vehicle-mounted elevating and rotating work platforms.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    .... (b) General requirements. (1) Unless otherwise provided in this section, aerial devices (aerial lifts.... Aerial lifts acquired for use before July 1, 1975 which do not meet the requirements of ANSI A92.2—1969... lifts whether or not they are capable of rotating about a substantially vertical axis. (2) Aerial lifts...

  16. 29 CFR 1910.67 - Vehicle-mounted elevating and rotating work platforms.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... (b) General requirements. (1) Unless otherwise provided in this section, aerial devices (aerial lifts.... Aerial lifts acquired for use before July 1, 1975 which do not meet the requirements of ANSI A92.2—1969... lifts whether or not they are capable of rotating about a substantially vertical axis. (2) Aerial lifts...

  17. 29 CFR 1926.453 - Aerial lifts.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... provided the modification has been certified in writing by the manufacturer or by any other equivalent... articulating boom platforms. (i) Lift controls shall be tested each day prior to use to determine that such controls are in safe working condition. (ii) Only authorized persons shall operate an aerial lift. (iii...

  18. 29 CFR 1926.453 - Aerial lifts.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... provided the modification has been certified in writing by the manufacturer or by any other equivalent... articulating boom platforms. (i) Lift controls shall be tested each day prior to use to determine that such controls are in safe working condition. (ii) Only authorized persons shall operate an aerial lift. (iii...

  19. 29 CFR 1926.453 - Aerial lifts.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... provided the modification has been certified in writing by the manufacturer or by any other equivalent... articulating boom platforms. (i) Lift controls shall be tested each day prior to use to determine that such controls are in safe working condition. (ii) Only authorized persons shall operate an aerial lift. (iii...

  20. 29 CFR 1926.453 - Aerial lifts.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... provided the modification has been certified in writing by the manufacturer or by any other equivalent... articulating boom platforms. (i) Lift controls shall be tested each day prior to use to determine that such controls are in safe working condition. (ii) Only authorized persons shall operate an aerial lift. (iii...

  1. 29 CFR 1926.453 - Aerial lifts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... provided the modification has been certified in writing by the manufacturer or by any other equivalent... articulating boom platforms. (i) Lift controls shall be tested each day prior to use to determine that such controls are in safe working condition. (ii) Only authorized persons shall operate an aerial lift. (iii...

  2. Preparation for Retrievals from Sellafield Legacy Ponds Installation of the Gantry Refurbishment System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ellison, M.

    2008-07-01

    Retrieval of sludge and fuel from the First Generation Magnox Fuel Storage Pond, and its safe long term storage is one of the NDA's top priorities in the UK clean up programme. The plant is currently undergoing a series of major modifications in preparation for the retrievals operations. The most visible example of these modifications is the Gantry Refurbishment System (GRS), a major work platform which has recently been lifted onto the pond long travel girders used by the Skip Handler. This paper describes the design, manufacture, works test, and site installation of this major piece of equipment. The installationmore » lift, involving the use of an 800Te crane was one of the largest lifts undertaken at Sellafield. The GRS is a mobile platform structure which is designed to be pushed or pulled along the long travel girders by the Skip Handler. Its principle function is to provide a safe and shielded working platform from which to undertake refurbishment of the Skip Handler long travel girders and support structure. The potential hazards and consequences resulting from the modification were fully understood and controls were put in place to ensure that the risk of carrying out the work was as low as reasonably practicable. The work was authorised by the NII, Sellafield Nuclear Safety Committee and an independent readiness review panel. Despite less than perfect weather in the run up to the lift, the GRS was successfully and safely lifted onto the pond on 18 October 2006, the culmination of three years of planning, engineering and construction. (authors)« less

  3. 77 FR 32644 - Medical Devices; Exemption From Premarket Notification: Wheelchair Elevator

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-01

    ... elevator devices commonly known as inclined platform lifts and vertical platform lifts. These devices are... inclined platform lifts and vertical platform lifts), classified under 21 CFR 890.3930. IV. Comments...

  4. 46 CFR 163.002-21 - Approval tests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... must not break or crack during these tests. (2) Platform strength. If the pilot hoist has a lift... deck interlock must prevent movement of the ladder or lift platform when the lever is activated. (4... of the hoist is placed on its ladder or lift platform. The ladder or lift platform is repeatedly...

  5. 77 FR 20558 - Federal Motor Vehicle Safety Standards; Platform Lifts for Motor Vehicles; Platform Lift...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-05

    ... amendments to the Federal motor vehicle safety standards on platform lift systems for motor vehicles. The... [email protected] . For legal issues, you may contact David Jasinski, Office of the Chief Counsel, NCC... in the Federal Register a final rule establishing FMVSS No. 403, Platform lift systems for motor...

  6. 49 CFR 571.404 - Standard No. 404; Platform lift installations in motor vehicles.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 6 2010-10-01 2010-10-01 false Standard No. 404; Platform lift installations in... VEHICLE SAFETY STANDARDS Federal Motor Vehicle Safety Standards § 571.404 Standard No. 404; Platform lift... platform lifts used to assist persons with limited mobility in entering or leaving a vehicle. S2. Purpose...

  7. 49 CFR 571.404 - Standard No. 404; Platform lift installations in motor vehicles.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 6 2011-10-01 2011-10-01 false Standard No. 404; Platform lift installations in... VEHICLE SAFETY STANDARDS Federal Motor Vehicle Safety Standards § 571.404 Standard No. 404; Platform lift... platform lifts used to assist persons with limited mobility in entering or leaving a vehicle. S2. Purpose...

  8. KENNEDY SPACE CENTER, FLA. -- Endeavour backs out of the Orbiter Processing Facility for temporary transfer to the Vehicle Assembly Building. The move allows work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bay’s cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

    NASA Image and Video Library

    2004-01-09

    KENNEDY SPACE CENTER, FLA. -- Endeavour backs out of the Orbiter Processing Facility for temporary transfer to the Vehicle Assembly Building. The move allows work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bay’s cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

  9. Low profile, high load vertical rolling positioning stage

    DOEpatents

    Shu, Deming; Barraza, Juan

    1996-01-01

    A stage or support platform assembly for use in a synchrotron accurately positions equipment to be used in the beam line of the synchrotron. The support platform assembly includes an outer housing in which is disposed a lifting mechanism having a lifting platform or stage at its upper extremity on which the equipment is mounted. A worm gear assembly is located in the housing and is adapted to raise and lower a lifting shaft that is fixed to the lifting platform by an anti-binding connection. The lifting platform is moved vertically as the lifting shaft is moved vertically. The anti-binding connection prevents the shaft from rotating with respect to the platform, but does permit slight canting of the shaft with respect to the lifting platform so as to eliminate binding and wear due to possible tolerance mismatches. In order to ensure that the lifting mechanism does not move in a horizontal direction as it is moved vertically, at least three linear roller bearing assemblies are arranged around the outer-periphery of the lifting mechanism. One of the linear roller bearing assemblies can be adjusted so that the roller bearings apply a loading force against the lifting mechanism. Alternatively, a cam mechanism can be used to provide such a loading force.

  10. KENNEDY SPACE CENTER, FLA. - The orbiter Atlantis is backed out of the Vehicle Assembly Building for transfer back to the Orbiter Processing Facility. Atlantis spent 10 days in the VAB to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-16

    KENNEDY SPACE CENTER, FLA. - The orbiter Atlantis is backed out of the Vehicle Assembly Building for transfer back to the Orbiter Processing Facility. Atlantis spent 10 days in the VAB to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

  11. KENNEDY SPACE CENTER, FLA. - The orbiter Atlantis rolls into the Orbiter Processing Facility after spending 10 days in the Vehicle Assembly Building. The hiatus in the VAB allowed work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-16

    KENNEDY SPACE CENTER, FLA. - The orbiter Atlantis rolls into the Orbiter Processing Facility after spending 10 days in the Vehicle Assembly Building. The hiatus in the VAB allowed work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

  12. KENNEDY SPACE CENTER, FLA. - The orbiter Atlantis is back inside the Orbiter Processing Facility after spending 10 days in the Vehicle Assembly Building. The hiatus in the VAB allowed work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-16

    KENNEDY SPACE CENTER, FLA. - The orbiter Atlantis is back inside the Orbiter Processing Facility after spending 10 days in the Vehicle Assembly Building. The hiatus in the VAB allowed work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

  13. KENNEDY SPACE CENTER, FLA. -- The orbiter Atlantis is backed away from the Vehicle Assembly Building for transfer back to the Orbiter Processing Facility. Atlantis spent 10 days in the VAB to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-16

    KENNEDY SPACE CENTER, FLA. -- The orbiter Atlantis is backed away from the Vehicle Assembly Building for transfer back to the Orbiter Processing Facility. Atlantis spent 10 days in the VAB to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

  14. KENNEDY SPACE CENTER, FLA. - The orbiter Atlantis rolls toward the Orbiter Processing Facility after spending 10 days in the Vehicle Assembly Building. The hiatus in the VAB allowed work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-16

    KENNEDY SPACE CENTER, FLA. - The orbiter Atlantis rolls toward the Orbiter Processing Facility after spending 10 days in the Vehicle Assembly Building. The hiatus in the VAB allowed work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

  15. KENNEDY SPACE CENTER, FLA. -- The orbiter Atlantis is backed out of the Vehicle Assembly Building for transfer back to the Orbiter Processing Facility. Atlantis spent 10 days in the VAB to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-16

    KENNEDY SPACE CENTER, FLA. -- The orbiter Atlantis is backed out of the Vehicle Assembly Building for transfer back to the Orbiter Processing Facility. Atlantis spent 10 days in the VAB to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

  16. KENNEDY SPACE CENTER, FLA. - The orbiter Atlantis rolls out of the Vehicle Assembly Building for transfer back to the Orbiter Processing Facility. Atlantis spent 10 days in the VAB to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-16

    KENNEDY SPACE CENTER, FLA. - The orbiter Atlantis rolls out of the Vehicle Assembly Building for transfer back to the Orbiter Processing Facility. Atlantis spent 10 days in the VAB to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

  17. KENNEDY SPACE CENTER, FLA. - The orbiter Atlantis is towed back to the Orbiter Processing Facility after spending 10 days in the Vehicle Assembly Building. The hiatus in the VAB allowed work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-16

    KENNEDY SPACE CENTER, FLA. - The orbiter Atlantis is towed back to the Orbiter Processing Facility after spending 10 days in the Vehicle Assembly Building. The hiatus in the VAB allowed work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

  18. Platform C Installation

    NASA Image and Video Library

    2016-10-19

    A heavy-lift crane lowers the first half of the C-level work platforms, C south, for NASA’s Space Launch System (SLS) rocket, for installation on the south side of High Bay 3 in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. In view below Platform C are several of the previously installed platforms. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  19. KENNEDY SPACE CENTER, FLA. -- Endeavour settles into place inside the Vehicle Assembly Building (VAB) where it has been moved for temporary storage. It left the Orbiter Processing Facility (OPF) to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bay’s cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

    NASA Image and Video Library

    2004-01-09

    KENNEDY SPACE CENTER, FLA. -- Endeavour settles into place inside the Vehicle Assembly Building (VAB) where it has been moved for temporary storage. It left the Orbiter Processing Facility (OPF) to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bay’s cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

  20. KENNEDY SPACE CENTER, FLA. -- Endeavour begins rolling out of the Orbiter Processing Facility for temporary transfer to the Vehicle Assembly Building. The move allows work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bay’s cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

    NASA Image and Video Library

    2004-01-09

    KENNEDY SPACE CENTER, FLA. -- Endeavour begins rolling out of the Orbiter Processing Facility for temporary transfer to the Vehicle Assembly Building. The move allows work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bay’s cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

  1. KENNEDY SPACE CENTER, FLA. -- Endeavour rolls into the Vehicle Assembly Building (VAB) for temporary storage. The orbiter has been moved from the Orbiter Processing Facility (OPF) to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bay’s cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

    NASA Image and Video Library

    2004-01-09

    KENNEDY SPACE CENTER, FLA. -- Endeavour rolls into the Vehicle Assembly Building (VAB) for temporary storage. The orbiter has been moved from the Orbiter Processing Facility (OPF) to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bay’s cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

  2. KENNEDY SPACE CENTER, FLA. -- Endeavour is towed toward the Vehicle Assembly Building for temporary storage. The orbiter has been moved from the Orbiter Processing Facility (OPF) to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bay’s cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

    NASA Image and Video Library

    2004-01-09

    KENNEDY SPACE CENTER, FLA. -- Endeavour is towed toward the Vehicle Assembly Building for temporary storage. The orbiter has been moved from the Orbiter Processing Facility (OPF) to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bay’s cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

  3. KENNEDY SPACE CENTER, FLA. -- Endeavour is ready to be rolled out of the Orbiter Processing Facility for temporary transfer to the Vehicle Assembly Building. The move allows work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bay’s cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

    NASA Image and Video Library

    2004-01-09

    KENNEDY SPACE CENTER, FLA. -- Endeavour is ready to be rolled out of the Orbiter Processing Facility for temporary transfer to the Vehicle Assembly Building. The move allows work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bay’s cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

  4. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    A heavy-lift crane lowers the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, into High Bay 3 of the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The C platform will be installed on the north side of High Bay 3. In view below are several of the previously installed levels of platforms. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  5. 49 CFR 571.403 - Standard No. 403; Platform lift systems for motor vehicles.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... relative to the platform surface. After removal of the load, the handrail must exhibit no permanent... 49 Transportation 6 2012-10-01 2012-10-01 false Standard No. 403; Platform lift systems for motor... STANDARDS Federal Motor Vehicle Safety Standards § 571.403 Standard No. 403; Platform lift systems for motor...

  6. KENNEDY SPACE CENTER, FLA. - Workers accompany the orbiter Atlantis as it is towed back to the Orbiter Processing Facility after spending 10 days in the Vehicle Assembly Building. The hiatus in the VAB allowed work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-16

    KENNEDY SPACE CENTER, FLA. - Workers accompany the orbiter Atlantis as it is towed back to the Orbiter Processing Facility after spending 10 days in the Vehicle Assembly Building. The hiatus in the VAB allowed work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

  7. KENNEDY SPACE CENTER, FLA. -- Endeavour is towed in front of the Vehicle Assembly Building (VAB) where it is going for temporary storage. The orbiter has been moved from the Orbiter Processing Facility (OPF) to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bay’s cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

    NASA Image and Video Library

    2004-01-09

    KENNEDY SPACE CENTER, FLA. -- Endeavour is towed in front of the Vehicle Assembly Building (VAB) where it is going for temporary storage. The orbiter has been moved from the Orbiter Processing Facility (OPF) to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bay’s cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

  8. VAB Platform K(2) Lift & Install into Highbay 3

    NASA Image and Video Library

    2016-03-07

    Work is underway to secure the second half of the K-level work platforms for NASA’s Space Launch System (SLS) rocket in High Bay 3 inside the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. The platform is being secured into position on tower E, about 86 feet above the floor. The K work platforms will provide access to NASA's Space Launch System (SLS) core stage and solid rocket boosters during processing and stacking operations on the mobile launcher. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to High Bay 3 to support processing of the SLS and Orion spacecraft. A total of 10 levels of new platforms, 20 platform halves altogether, will surround the SLS rocket and Orion spacecraft.

  9. 46 CFR 163.002-13 - Construction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... a rigid ladder or a lift platform on which a person being raised or lowered may stand. (b) Spreader. Each hoist must have a spreader or other device to prevent twisting of its ladder or lift platform. If.... The rigid ladder or lift platform on a pilot hoist and the ends of its spreader (if a spreader is...

  10. 46 CFR 163.002-13 - Construction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... a rigid ladder or a lift platform on which a person being raised or lowered may stand. (b) Spreader. Each hoist must have a spreader or other device to prevent twisting of its ladder or lift platform. If.... The rigid ladder or lift platform on a pilot hoist and the ends of its spreader (if a spreader is...

  11. 49 CFR 571.404 - Standard No. 404; Platform lift installations in motor vehicles.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... vehicle, with the vehicle's HVAC system turned off, for a minimum of 20 minutes, after which the engine is... Motor Vehicle Safety Standard No. 403, Lift Systems for Motor Vehicles (49 CFR 571.403). S4.1.2Lift... Safety Standard No. 403, Lift Systems for Motor Vehicles (49 CFR 571.403). S4.1.3Platform lifts must be...

  12. 49 CFR 571.404 - Standard No. 404; Platform lift installations in motor vehicles.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... vehicle, with the vehicle's HVAC system turned off, for a minimum of 20 minutes, after which the engine is... Motor Vehicle Safety Standard No. 403, Lift Systems for Motor Vehicles (49 CFR 571.403). S4.1.2Lift... Safety Standard No. 403, Lift Systems for Motor Vehicles (49 CFR 571.403). S4.1.3Platform lifts must be...

  13. 49 CFR 571.404 - Standard No. 404; Platform lift installations in motor vehicles.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... vehicle, with the vehicle's HVAC system turned off, for a minimum of 20 minutes, after which the engine is... Motor Vehicle Safety Standard No. 403, Lift Systems for Motor Vehicles (49 CFR 571.403). S4.1.2Lift... Safety Standard No. 403, Lift Systems for Motor Vehicles (49 CFR 571.403). S4.1.3Platform lifts must be...

  14. KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis approaches the Vehicle Assembly Building (VAB). It is being towed from the Orbiter Processing Facility (OPF) to allow work to be performed in the bay that can only be accomplished while it is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-05

    KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis approaches the Vehicle Assembly Building (VAB). It is being towed from the Orbiter Processing Facility (OPF) to allow work to be performed in the bay that can only be accomplished while it is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  15. KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis is towed from the Orbiter Processing Facility (OPF) to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-05

    KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis is towed from the Orbiter Processing Facility (OPF) to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  16. KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis nears the Vehicle Assembly Building (VAB). It is being towed from the Orbiter Processing Facility (OPF) to allow work to be performed in the bay that can only be accomplished while it is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-05

    KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis nears the Vehicle Assembly Building (VAB). It is being towed from the Orbiter Processing Facility (OPF) to allow work to be performed in the bay that can only be accomplished while it is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  17. KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis awaits transport from the Orbiter Processing Facility (OPF) to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-05

    KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis awaits transport from the Orbiter Processing Facility (OPF) to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  18. Detail view of fourth level platform winch used to lift ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Detail view of fourth level platform winch used to lift platform segments away from the Shuttle assembly during testing. - Marshall Space Flight Center, Saturn V Dynamic Test Facility, East Test Area, Huntsville, Madison County, AL

  19. KENNEDY SPACE CENTER, FLA. -- After Endeavour’s rollout from inside the Orbiter Processing Facility, the transporter (foreground) prepares to tow it to the Vehicle Assembly Building for temporary transfer. A protective cover surrounds the nose of Endeavour. The move to the VAB allows work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bay’s cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

    NASA Image and Video Library

    2004-01-09

    KENNEDY SPACE CENTER, FLA. -- After Endeavour’s rollout from inside the Orbiter Processing Facility, the transporter (foreground) prepares to tow it to the Vehicle Assembly Building for temporary transfer. A protective cover surrounds the nose of Endeavour. The move to the VAB allows work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bay’s cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

  20. VAB Platform K(2) Lift & Install into Highbay 3

    NASA Image and Video Library

    2016-03-07

    A 250-ton crane is used to lower the second half of the K-level work platforms for NASA’s Space Launch System (SLS) rocket into High Bay 3 inside the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. The platform will be secured about 86 feet above the VAB floor, on tower E of the high bay. The K work platforms will provide access to the SLS core stage and solid rocket boosters during processing and stacking operations on the mobile launcher. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to High Bay 3 to support processing of the SLS and Orion spacecraft. A total of 10 levels of new platforms, 20 platform halves altogether, will surround the SLS rocket and Orion spacecraft.

  1. 78 FR 14015 - Medical Devices; Exemption From Premarket Notification; Class II Devices; Powered Patient Transport

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-04

    ... for Safety--Collateral Standard: Electromagnetic Compatibility--Requirements and Tests,'' and ASME A18.1 ``Safety Standard for Platform Lifts and Stairway Chair Lifts'') must validate electromagnetic...: Electromagnetic Compatibility--Requirements and Tests,'' and ASME A18.1 ``Safety Standard for Platform Lifts and...

  2. KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis moves into high bay 4 of the Vehicle Assembly Building (VAB). It was towed from the Orbiter Processing Facility (OPF) to allow work to be performed in the bay that can only be accomplished while it is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-05

    KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis moves into high bay 4 of the Vehicle Assembly Building (VAB). It was towed from the Orbiter Processing Facility (OPF) to allow work to be performed in the bay that can only be accomplished while it is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  3. KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis awaits a tow from the Orbiter Processing Facility (OPF) to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-05

    KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis awaits a tow from the Orbiter Processing Facility (OPF) to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  4. KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis is turned into position outside the Orbiter Processing Facility (OPF) for its tow to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-05

    KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis is turned into position outside the Orbiter Processing Facility (OPF) for its tow to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  5. KENNEDY SPACE CENTER, FLA. - Workers back the Space Shuttle orbiter Atlantis out of the Orbiter Processing Facility (OPF) for its move to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-05

    KENNEDY SPACE CENTER, FLA. - Workers back the Space Shuttle orbiter Atlantis out of the Orbiter Processing Facility (OPF) for its move to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  6. KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis is moved into high bay 4 of the Vehicle Assembly Building (VAB). It was towed from the Orbiter Processing Facility (OPF) to allow work to be performed in the bay that can only be accomplished while it is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-05

    KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis is moved into high bay 4 of the Vehicle Assembly Building (VAB). It was towed from the Orbiter Processing Facility (OPF) to allow work to be performed in the bay that can only be accomplished while it is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  7. KENNEDY SPACE CENTER, FLA. - Workers prepare to tow the Space Shuttle orbiter Atlantis from the Orbiter Processing Facility (OPF) to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-05

    KENNEDY SPACE CENTER, FLA. - Workers prepare to tow the Space Shuttle orbiter Atlantis from the Orbiter Processing Facility (OPF) to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  8. KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis is moments away from a tow from the Orbiter Processing Facility (OPF) to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-05

    KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis is moments away from a tow from the Orbiter Processing Facility (OPF) to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  9. KENNEDY SPACE CENTER, FLA. - Workers monitor the Space Shuttle orbiter Atlantis as it is towed from the Orbiter Processing Facility (OPF) to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-05

    KENNEDY SPACE CENTER, FLA. - Workers monitor the Space Shuttle orbiter Atlantis as it is towed from the Orbiter Processing Facility (OPF) to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  10. KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis approaches the Vehicle Assembly Building (VAB) high bay 4. It is being towed from the Orbiter Processing Facility (OPF) to allow work to be performed in the bay that can only be accomplished while it is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-05

    KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis approaches the Vehicle Assembly Building (VAB) high bay 4. It is being towed from the Orbiter Processing Facility (OPF) to allow work to be performed in the bay that can only be accomplished while it is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  11. KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis approaches high bay 4 of the Vehicle Assembly Building (VAB). It was towed from the Orbiter Processing Facility (OPF) to allow work to be performed in the bay that can only be accomplished while it is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-05

    KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis approaches high bay 4 of the Vehicle Assembly Building (VAB). It was towed from the Orbiter Processing Facility (OPF) to allow work to be performed in the bay that can only be accomplished while it is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  12. KENNEDY SPACE CENTER, FLA. - Workers walk with Space Shuttle orbiter Atlantis from the Orbiter Processing Facility (OPF) to the Vehicle Assembly Building (VAB) high bay 4. The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-05

    KENNEDY SPACE CENTER, FLA. - Workers walk with Space Shuttle orbiter Atlantis from the Orbiter Processing Facility (OPF) to the Vehicle Assembly Building (VAB) high bay 4. The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  13. KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis backs out of the Orbiter Processing Facility (OPF) for its move to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-05

    KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis backs out of the Orbiter Processing Facility (OPF) for its move to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  14. KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis arrives in high bay 4 of the Vehicle Assembly Building (VAB). It was towed from the Orbiter Processing Facility (OPF) to allow work to be performed in the bay that can only be accomplished while it is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-05

    KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis arrives in high bay 4 of the Vehicle Assembly Building (VAB). It was towed from the Orbiter Processing Facility (OPF) to allow work to be performed in the bay that can only be accomplished while it is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  15. KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis is almost in position in high bay 4 of the Vehicle Assembly Building (VAB). It was towed from the Orbiter Processing Facility (OPF) to allow work to be performed in the bay that can only be accomplished while it is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-05

    KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis is almost in position in high bay 4 of the Vehicle Assembly Building (VAB). It was towed from the Orbiter Processing Facility (OPF) to allow work to be performed in the bay that can only be accomplished while it is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  16. KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis is reflected in a rain puddle as it is towed from the Orbiter Processing Facility (OPF) to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-05

    KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis is reflected in a rain puddle as it is towed from the Orbiter Processing Facility (OPF) to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  17. 46 CFR 163.002-5 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... load means the sum of the weights of— (1) The rigid ladder or lift platform, the suspension cables (if... persons capacity of the hoist; (c) Lift height means the distance from the lowest step of the pilot ladder... (2) If the hoist does not have suspension cables, the ladder or lift platform is in its lowest...

  18. 46 CFR 163.002-5 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... load means the sum of the weights of— (1) The rigid ladder or lift platform, the suspension cables (if... persons capacity of the hoist; (c) Lift height means the distance from the lowest step of the pilot ladder... (2) If the hoist does not have suspension cables, the ladder or lift platform is in its lowest...

  19. 49 CFR 571.403 - Standard No. 403; Platform lift systems for motor vehicles.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... conducting the fatigue test in S7.10. S6.5.1.2Private use lifts. Except for lifts that manually stow (fold... as a result of conducting the fatigue test in S7.10. S6.5.2Proof load. The platform lift must be... 100 cm2 (15.5 in2) of surface area. Begin the test specified in S7.2.2 within 30 seconds of completion...

  20. 49 CFR 571.403 - Standard No. 403; Platform lift systems for motor vehicles.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... conducting the fatigue test in S7.10. S6.5.1.2Private use lifts. Except for lifts that manually stow (fold... as a result of conducting the fatigue test in S7.10. S6.5.2Proof load. The platform lift must be... 100 cm2 (15.5 in2) of surface area. Begin the test specified in S7.2.2 within 30 seconds of completion...

  1. 49 CFR 38.25 - Doors, steps and thresholds.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... lift platforms shall have a band of color(s) running the full width of the step or edge which contrasts from the step tread and riser, or lift or ramp surface, either light-on-dark or dark-on-light. (c) Door... opening and the raised lift platform, or highest point of a ramp, shall be a minimum of 68 inches. For...

  2. 49 CFR 38.25 - Doors, steps and thresholds.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... lift platforms shall have a band of color(s) running the full width of the step or edge which contrasts from the step tread and riser, or lift or ramp surface, either light-on-dark or dark-on-light. (c) Door... opening and the raised lift platform, or highest point of a ramp, shall be a minimum of 68 inches. For...

  3. KSC-03PD-3237

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. The orbiter Atlantis rolls into the Orbiter Processing Facility after spending 10 days in the Vehicle Assembly Building. The hiatus in the VAB allowed work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

  4. KSC-03PD-3236

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. The orbiter Atlantis rolls toward the Orbiter Processing Facility after spending 10 days in the Vehicle Assembly Building. The hiatus in the VAB allowed work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

  5. KSC-04PD-0012

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. -- Endeavour backs out of the Orbiter Processing Facility for temporary transfer to the Vehicle Assembly Building. The move allows work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bays cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

  6. KSC-04PD-0011

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. -- Endeavour begins rolling out of the Orbiter Processing Facility for temporary transfer to the Vehicle Assembly Building. The move allows work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bays cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

  7. KSC-03PD-3238

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. The orbiter Atlantis is back inside the Orbiter Processing Facility after spending 10 days in the Vehicle Assembly Building. The hiatus in the VAB allowed work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

  8. KSC-03PD-3232

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. The orbiter Atlantis is backed out of the Vehicle Assembly Building for transfer back to the Orbiter Processing Facility. Atlantis spent 10 days in the VAB to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

  9. KSC-03PD-3235

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. The orbiter Atlantis is towed back to the Orbiter Processing Facility after spending 10 days in the Vehicle Assembly Building. The hiatus in the VAB allowed work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

  10. KSC-03PD-3230

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. -- The orbiter Atlantis is backed out of the Vehicle Assembly Building for transfer back to the Orbiter Processing Facility. Atlantis spent 10 days in the VAB to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

  11. KSC-03PD-3233

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. The orbiter Atlantis rolls out of the Vehicle Assembly Building for transfer back to the Orbiter Processing Facility. Atlantis spent 10 days in the VAB to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

  12. KSC-03PD-3231

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. -- The orbiter Atlantis is backed away from the Vehicle Assembly Building for transfer back to the Orbiter Processing Facility. Atlantis spent 10 days in the VAB to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

  13. Platform C South Arrival

    NASA Image and Video Library

    2016-08-04

    A heavy load transport truck from Tillett Heavy Hauling in Titusville, Florida, arrives at the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida, carrying a section of the first half of the C-level work platforms, C South, for the agency’s Space Launch System (SLS) rocket. The platform is being lifted and transferred onto support stands in the VAB staging area in the west parking lot. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3 to support processing of the SLS and Orion spacecraft. A total of 10 levels of new platforms, 20 platform halves altogether, will surround the SLS rocket and Orion spacecraft and provide access for testing and processing.

  14. KSC-04PD-0017

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. -- Endeavour rolls into the Vehicle Assembly Building (VAB) for temporary storage. The orbiter has been moved from the Orbiter Processing Facility (OPF) to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bays cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

  15. KSC-04PD-0010

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. -- Endeavour is ready to be rolled out of the Orbiter Processing Facility for temporary transfer to the Vehicle Assembly Building. The move allows work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bays cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

  16. KSC-04PD-0018

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. -- Endeavour rolls into the Vehicle Assembly Building (VAB) for temporary storage. The orbiter has been moved from the Orbiter Processing Facility (OPF) to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bays cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

  17. KSC-04PD-0014

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. -- Endeavour is towed toward the Vehicle Assembly Building for temporary storage. The orbiter has been moved from the Orbiter Processing Facility (OPF) to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bays cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

  18. Alignment and position visualization methods for the biomedical imaging and therapy (BMIT) MRT lift

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bree, Michael, E-mail: michael.bree@lightsource.ca; Miller, Denise; Kerr, Graham

    The Microbeam Radiation Therapy (MRT) Lift is an eight stage positioning and scanning system at the Canadian Light Source’s BMIT Facility. Alignment of the sample with the beam using the MRT Lift is a time consuming and challenging task. The BMIT Group has developed a Python-based MRT Lift positioning and control program that uses a combination of computational and iterative methods to independently adjust the sample’s X, Y, Z, pitch and roll positions. The program offers “1-Click” alignment of the sample to the beam. Use of a wireframe visualization technique enables even minute movements to be illustrated. Proposed movements andmore » the resulting MRT Lift position can be manually verified before being applied. Optional integration with the SolidWorks modelling platform allows high quality renderings of the MRT Lift in its current or proposed position to be displayed in real time. Human factors principles are incorporated into the program with the objective of delivering easy to use controls for this complex device.« less

  19. KSC-03PD-3234

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. Workers accompany the orbiter Atlantis as it is towed back to the Orbiter Processing Facility after spending 10 days in the Vehicle Assembly Building. The hiatus in the VAB allowed work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

  20. KSC-04PD-0019

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. -- Endeavour settles into place inside the Vehicle Assembly Building (VAB) where it has been moved for temporary storage. It left the Orbiter Processing Facility (OPF) to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bays cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

  1. 36 CFR 1192.81 - Lighting.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Vehicles and Systems § 1192.81 Lighting. (a) Any stepwell or doorway with a lift, ramp or bridge plate... measured on the step tread or lift platform. (b) Other stepwells, and doorways with lifts, ramps or bridge... lift or ramp, when deployed at the vehicle floor level. (c) The doorways of vehicles not operating at...

  2. 36 CFR 1192.81 - Lighting.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Vehicles and Systems § 1192.81 Lighting. (a) Any stepwell or doorway with a lift, ramp or bridge plate... measured on the step tread or lift platform. (b) Other stepwells, and doorways with lifts, ramps or bridge... lift or ramp, when deployed at the vehicle floor level. (c) The doorways of vehicles not operating at...

  3. KSC-04PD-0016

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. -- Endeavour is towed in front of the Vehicle Assembly Building (VAB) where it is going for temporary storage. The orbiter has been moved from the Orbiter Processing Facility (OPF) to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bays cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

  4. KSC-04PD-0015

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. -- Endeavour is towed in front of the Vehicle Assembly Building (VAB) where it is going for temporary storage. The orbiter has been moved from the Orbiter Processing Facility (OPF) to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bays cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

  5. Development of an integrated staircase lift for home access.

    PubMed

    Mattie, Johanne L; Borisoff, Jaimie F; Leland, Danny; Miller, William C

    2015-12-01

    Stairways into buildings present a significant environmental barrier for those with mobility impairments, including older adults. A number of home access solutions that allow users to safely enter and exit the home exist, however these all have some limitations. The purpose of this work was to develop a novel, inclusive home access solution that integrates a staircase and a lift into one device. The development of an integrated staircase lift followed a structured protocol with stakeholders providing feedback at various stages in the design process, consistent with rehabilitation engineering design methods. A novel home access device was developed. The integrated staircase-lift has the following features: inclusivity, by a universal design that provides an option for either use of stairs or a lift; constant availability, with a lift platform always ready for use on either level; and potential aesthetic advantages when integrating the device into an existing home. The potential also exists for emergency descent during a power outage, and self-powered versions. By engaging stakeholders in a user centred design process, insight on the limitations of existing home access solutions and specific feedback on our design guided development of a novel home access device.

  6. Quasi-steady aerodynamic model of clap-and-fling flapping MAV and validation using free-flight data.

    PubMed

    Armanini, S F; Caetano, J V; Croon, G C H E de; Visser, C C de; Mulder, M

    2016-06-30

    Flapping-wing aerodynamic models that are accurate, computationally efficient and physically meaningful, are challenging to obtain. Such models are essential to design flapping-wing micro air vehicles and to develop advanced controllers enhancing the autonomy of such vehicles. In this work, a phenomenological model is developed for the time-resolved aerodynamic forces on clap-and-fling ornithopters. The model is based on quasi-steady theory and accounts for inertial, circulatory, added mass and viscous forces. It extends existing quasi-steady approaches by: including a fling circulation factor to account for unsteady wing-wing interaction, considering real platform-specific wing kinematics and different flight regimes. The model parameters are estimated from wind tunnel measurements conducted on a real test platform. Comparison to wind tunnel data shows that the model predicts the lift forces on the test platform accurately, and accounts for wing-wing interaction effectively. Additionally, validation tests with real free-flight data show that lift forces can be predicted with considerable accuracy in different flight regimes. The complete parameter-varying model represents a wide range of flight conditions, is computationally simple, physically meaningful and requires few measurements. It is therefore potentially useful for both control design and preliminary conceptual studies for developing new platforms.

  7. KSC-2012-1676

    NASA Image and Video Library

    2012-03-08

    CAPE CANAVERAL, Fla. – Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, a large crane lifts a new engine and generator high overhead for installation on crawler-transporter 2 CT-2). The Apollo era diesel engines were removed last month. Work continues in high bay 2 to upgrade CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket, which is under design, and new Orion spacecraft to the launch pad. The crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Jim Grossmann

  8. KSC-2012-1349

    NASA Image and Video Library

    2012-02-15

    CAPE CANAVERAL, Fla. –– Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, a crane is used to lift an Apollo era diesel engine away from crawler-transporter 2 CT-2). New engines will be installed later this month. Work is in progress in high bay 2 to upgrade CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket, which is under design, and new Orion spacecraft to the launch pad. The crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Kim Shiflett

  9. KSC-2012-1674

    NASA Image and Video Library

    2012-03-08

    CAPE CANAVERAL, Fla. – Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, technicians monitor the progress as a large crane lifts a new engine and generator for installation on crawler-transporter 2 CT-2). The Apollo era diesel engines were removed last month. Work continues in high bay 2 to upgrade CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket, which is under design, and new Orion spacecraft to the launch pad. The crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Jim Grossmann

  10. KSC-2012-1350

    NASA Image and Video Library

    2012-02-15

    CAPE CANAVERAL, Fla. –– Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, a crane is used to lift an Apollo era diesel engine away from crawler-transporter 2 CT-2). New engines will be installed later this month. Work is in progress in high bay 2 to upgrade CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket, which is under design, and new Orion spacecraft to the launch pad. The crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Kim Shiflett

  11. KSC-2012-1675

    NASA Image and Video Library

    2012-03-08

    CAPE CANAVERAL, Fla. – Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, a large crane is used to lift a new engine and generator high overhead for installation on crawler-transporter 2 CT-2). The Apollo era diesel engines were removed last month. Work continues in high bay 2 to upgrade CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket, which is under design, and new Orion spacecraft to the launch pad. The crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Jim Grossmann

  12. KSC-2012-1337

    NASA Image and Video Library

    2012-02-15

    CAPE CANAVERAL, Fla. –– Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, a crane begins to lift part of an Apollo era diesel engine from crawler-transporter 2 CT-2). New engines will be installed later this month. Work is in progress in high bay 2 to upgrade CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket, which is under design, and new Orion spacecraft to the launch pad. The crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Kim Shiflett

  13. KSC-2012-1351

    NASA Image and Video Library

    2012-02-15

    CAPE CANAVERAL, Fla. –– Just outside of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, a crane is used to lift an Apollo era diesel engine away from crawler-transporter 2 CT-2). New engines will be installed later this month. Work is in progress in high bay 2 to upgrade CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket, which is under design, and new Orion spacecraft to the launch pad. The crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Kim Shiflett

  14. KSC-2012-1346

    NASA Image and Video Library

    2012-02-15

    CAPE CANAVERAL, Fla. –– Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, technicians monitor the progress as a crane begins to lift an Apollo era diesel engine from crawler-transporter 2 CT-2). New engines will be installed later this month. Work is in progress in high bay 2 to upgrade CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket, which is under design, and new Orion spacecraft to the launch pad. The crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Kim Shiflett

  15. KSC-2012-1340

    NASA Image and Video Library

    2012-02-15

    CAPE CANAVERAL, Fla. –– Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, a crane operator lifts part of an Apollo era diesel engine away from crawler-transporter 2 CT-2). New engines will be installed later this month. Work is in progress in high bay 2 to upgrade CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket, which is under design, and new Orion spacecraft to the launch pad. The crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Kim Shiflett

  16. KSC-2012-1673

    NASA Image and Video Library

    2012-03-08

    CAPE CANAVERAL, Fla. – Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, technicians monitor the progress as a large crane begins to lift a new engine and generator for installation on crawler-transporter 2 CT-2). The Apollo era diesel engines were removed last month. Work continues in high bay 2 to upgrade CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket, which is under design, and new Orion spacecraft to the launch pad. The crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Jim Grossmann

  17. KSC-2012-1338

    NASA Image and Video Library

    2012-02-15

    CAPE CANAVERAL, Fla. –– Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, a crane begins to lift part of an Apollo era diesel engine from crawler-transporter 2 CT-2). New engines will be installed later this month. Work is in progress in high bay 2 to upgrade CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket, which is under design, and new Orion spacecraft to the launch pad. The crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Kim Shiflett

  18. KSC-2012-1352

    NASA Image and Video Library

    2012-02-15

    CAPE CANAVERAL, Fla. –– Just outside of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, a crane is used to lift an Apollo era diesel engine away from crawler-transporter 2 CT-2). New engines will be installed later this month. Work is in progress in high bay 2 to upgrade CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket, which is under design, and new Orion spacecraft to the launch pad. The crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Kim Shiflett

  19. KSC-2012-1344

    NASA Image and Video Library

    2012-02-15

    CAPE CANAVERAL, Fla. ––Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, a technician monitors the progress as a crane begins to lift an Apollo era diesel engine from crawler-transporter 2 CT-2). New engines will be installed later this month. Work is in progress in high bay 2 to upgrade CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket, which is under design, and new Orion spacecraft to the launch pad. The crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Kim Shiflett

  20. KSC-2012-1677

    NASA Image and Video Library

    2012-03-08

    CAPE CANAVERAL, Fla. – Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, a large crane lifts a new engine and generator high overhead for installation on crawler-transporter 2 CT-2). The Apollo era diesel engines were removed last month. Work continues in high bay 2 to upgrade CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket, which is under design, and new Orion spacecraft to the launch pad. The crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Jim Grossmann

  1. KSC-2012-1348

    NASA Image and Video Library

    2012-02-15

    CAPE CANAVERAL, Fla. –– Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, a technician monitors the progress as a crane lifts an Apollo era diesel engine from crawler-transporter 2 CT-2). New engines will be installed later this month. Work is in progress in high bay 2 to upgrade CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket, which is under design, and new Orion spacecraft to the launch pad. The crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Kim Shiflett

  2. KSC-2012-1345

    NASA Image and Video Library

    2012-02-15

    CAPE CANAVERAL, Fla. –– Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, technicians prepare an Apollo era diesel engine to be lifted by crane from crawler-transporter 2 CT-2). New engines will be installed later this month. Work is in progress in high bay 2 to upgrade CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket, which is under design, and new Orion spacecraft to the launch pad. The crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Kim Shiflett

  3. KSC-2012-1339

    NASA Image and Video Library

    2012-02-15

    CAPE CANAVERAL, Fla. –– Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, a crane lifts part of an Apollo era diesel engine from crawler-transporter 2 CT-2). New engines will be installed later this month. Work is in progress in high bay 2 to upgrade CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket, which is under design, and new Orion spacecraft to the launch pad. The crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Kim Shiflett

  4. KSC-2012-1347

    NASA Image and Video Library

    2012-02-15

    CAPE CANAVERAL, Fla. –– Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, technicians monitor the progress as a crane lifts an Apollo era diesel engine from crawler-transporter 2 CT-2). New engines will be installed later this month. Work is in progress in high bay 2 to upgrade CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket, which is under design, and new Orion spacecraft to the launch pad. The crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Kim Shiflett

  5. Measuring Lift with the Wright Airfoils

    ERIC Educational Resources Information Center

    Heavers, Richard M.; Soleymanloo, Arianne

    2011-01-01

    In this laboratory or demonstration exercise, we mount a small airfoil with its long axis vertical at one end of a nearly frictionless rotating platform. Air from a leaf blower produces a sidewise lift force L on the airfoil and a drag force D in the direction of the air flow (Fig. 1). The rotating platform is kept in equilibrium by adding weights…

  6. Impact of the A18.1 ASME Standard on Platform Lifts and Stairway Chairlifts on Accessibility and Usability

    ERIC Educational Resources Information Center

    Balmer, David C.

    2010-01-01

    This article summarizes the effect of the ASME A18.1 Standard concerning accessibility and usability of Platform Lifts and their remaining technological challenges. While elevators are currently the most effective means of vertical transportation related to speed, capacity, rise and usability, their major drawbacks for accessibility are cost and…

  7. 49 CFR 37.42 - Service in an Integrated Setting to Passengers at Intercity, Commuter, and High-Speed Rail...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... plates, ramps or other appropriate devices; (4) Mini-high platforms, with multiple mini-high platforms or... chooses a means of meeting the performance standard other than using car-borne lifts, it must perform a comparison of the costs (capital, operating, and life-cycle costs) of car-borne lifts and the means chosen by...

  8. 49 CFR 37.42 - Service in an Integrated Setting to Passengers at Intercity, Commuter, and High-Speed Rail...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... plates, ramps or other appropriate devices; (4) Mini-high platforms, with multiple mini-high platforms or... chooses a means of meeting the performance standard other than using car-borne lifts, it must perform a comparison of the costs (capital, operating, and life-cycle costs) of car-borne lifts and the means chosen by...

  9. 49 CFR 37.42 - Service in an integrated setting to passengers at intercity, commuter, and high-speed rail...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... plates, ramps or other appropriate devices; (4) Mini-high platforms, with multiple mini-high platforms or... chooses a means of meeting the performance standard other than using car-borne lifts, it must perform a comparison of the costs (capital, operating, and life-cycle costs) of car-borne lifts and the means chosen by...

  10. 49 CFR 37.42 - Service in an Integrated Setting to Passengers at Intercity, Commuter, and High-Speed Rail...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... plates, ramps or other appropriate devices; (4) Mini-high platforms, with multiple mini-high platforms or... chooses a means of meeting the performance standard other than using car-borne lifts, it must perform a comparison of the costs (capital, operating, and life-cycle costs) of car-borne lifts and the means chosen by...

  11. KSC-03PD-3196

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. The Space Shuttle orbiter Atlantis approaches the Vehicle Assembly Building (VAB). It is being towed from the Orbiter Processing Facility (OPF) to allow work to be performed in the bay that can only be accomplished while it is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  12. KSC-03PD-3194

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. The Space Shuttle orbiter Atlantis is towed from the Orbiter Processing Facility (OPF) to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  13. KSC-03PD-3197

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. The Space Shuttle orbiter Atlantis nears the Vehicle Assembly Building (VAB). It is being towed from the Orbiter Processing Facility (OPF) to allow work to be performed in the bay that can only be accomplished while it is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  14. KSC-03PD-3189

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. The Space Shuttle orbiter Atlantis awaits transport from the Orbiter Processing Facility (OPF) to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  15. Workers in the VAB move sling into place to lift Columbia to mobile launcher

    NASA Technical Reports Server (NTRS)

    1982-01-01

    Workers in the Vehicle Assembly Building (VAB) move a specially-built sling into place to lift Orbiter Columbia from the transfer aisle to the mobile launcher platform (27015); Columbia is lifted from the floor of the VAB transfer aisle (27016).

  16. Enhanced Rescue Lift Capability

    NASA Technical Reports Server (NTRS)

    Young, Larry A.

    2007-01-01

    The evolving and ever-increasing demands of emergency response and disaster relief support provided by rotorcraft dictate, among other things, the development of enhanced rescue lift capability for these platforms. This preliminary analysis is first-order in nature but provides considerable insight into some of the challenges inherent in trying to effect rescue using a unique form of robotic rescue device deployed and operated from rotary-wing aerial platforms.

  17. 49 CFR 38.31 - Lighting.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... measured on the step tread or lift platform. (b) Other stepwells and doorways, including doorways in which lifts or ramps are installed, shall have, at all times, at least 2 foot-candles of illumination measured on the step tread, or lift or ramp, when deployed at the vehicle floor level. (c) The vehicle...

  18. 49 CFR 38.31 - Lighting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... measured on the step tread or lift platform. (b) Other stepwells and doorways, including doorways in which lifts or ramps are installed, shall have, at all times, at least 2 foot-candles of illumination measured on the step tread, or lift or ramp, when deployed at the vehicle floor level. (c) The vehicle...

  19. KSC-04PD-0013

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. -- After Endeavours rollout from inside the Orbiter Processing Facility, the transporter (foreground) prepares to tow it to the Vehicle Assembly Building for temporary transfer. A protective cover surrounds the nose of Endeavour. The move to the VAB allows work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bays cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

  20. 49 CFR 38.81 - Lighting.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... doorway with a lift, ramp or bridge plate immediately adjacent to the driver shall have, when the door is open, at least 2 foot-candles of illumination measured on the step tread or lift platform. (b) Other stepwells, and doorways with lifts, ramps or bridge plates, shall have, at all times, at least 2 foot...

  1. 36 CFR 1192.31 - Lighting.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., when the door is open, at least 2 foot-candles of illumination measured on the step tread or lift platform. (b) Other stepwells and doorways, including doorways in which lifts or ramps are installed, shall have, at all times, at least 2 foot-candles of illumination measured on the step tread, or lift or ramp...

  2. 49 CFR 38.81 - Lighting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... doorway with a lift, ramp or bridge plate immediately adjacent to the driver shall have, when the door is open, at least 2 foot-candles of illumination measured on the step tread or lift platform. (b) Other stepwells, and doorways with lifts, ramps or bridge plates, shall have, at all times, at least 2 foot...

  3. 36 CFR 1192.31 - Lighting.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., when the door is open, at least 2 foot-candles of illumination measured on the step tread or lift platform. (b) Other stepwells and doorways, including doorways in which lifts or ramps are installed, shall have, at all times, at least 2 foot-candles of illumination measured on the step tread, or lift or ramp...

  4. 77 FR 55206 - Freedom Falls, LLC; Notice of Application Accepted for Filing, Intent To Waive Scoping, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... working platform; (5) a new 60-foot-long, 30-inch-diameter steel penstock leading to; (6) an existing 20... proposed Freedom Falls Hydroelectric Project would consist of: (1) An existing 90-foot-long, 12-foot-high concrete-capped stone masonry dam with a 25-foot-long, 10-foot-high spillway with two vertical lift sluice...

  5. KSC-03PD-3198

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. The Space Shuttle orbiter Atlantis is moved into high bay 4 of the Vehicle Assembly Building (VAB). It was towed from the Orbiter Processing Facility (OPF) to allow work to be performed in the bay that can only be accomplished while it is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to- flight mission, STS-114.

  6. KSC-03PD-3207

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. The Space Shuttle orbiter Atlantis approaches the Vehicle Assembly Building (VAB) high bay 4. It is being towed from the Orbiter Processing Facility (OPF) to allow work to be performed in the bay that can only be accomplished while it is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to- flight mission, STS-114.

  7. KSC-03PD-3193

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. The Space Shuttle orbiter Atlantis is turned into position outside the Orbiter Processing Facility (OPF) for its tow to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  8. KSC-03PD-3195

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. Workers monitor the Space Shuttle orbiter Atlantis as it is towed from the Orbiter Processing Facility (OPF) to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  9. KSC-03PD-3199

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. Workers back the Space Shuttle orbiter Atlantis out of the Orbiter Processing Facility (OPF) for its move to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to- flight mission, STS-114.

  10. KSC-03PD-3200

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. The Space Shuttle orbiter Atlantis is reflected in a rain puddle as it is towed from the Orbiter Processing Facility (OPF) to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  11. KSC-03PD-3203

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. The Space Shuttle orbiter Atlantis is almost in position in high bay 4 of the Vehicle Assembly Building (VAB). It was towed from the Orbiter Processing Facility (OPF) to allow work to be performed in the bay that can only be accomplished while it is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  12. KSC-03PD-3201

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. The Space Shuttle orbiter Atlantis approaches high bay 4 of the Vehicle Assembly Building (VAB). It was towed from the Orbiter Processing Facility (OPF) to allow work to be performed in the bay that can only be accomplished while it is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to- flight mission, STS-114.

  13. KSC-03PD-3188

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. The Space Shuttle orbiter Atlantis awaits a tow from the Orbiter Processing Facility (OPF) to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  14. KSC-03PD-3205

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. The Space Shuttle orbiter Atlantis backs out of the Orbiter Processing Facility (OPF) for its move to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to- flight mission, STS-114.

  15. KSC-03PD-3202

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. The Space Shuttle orbiter Atlantis moves into high bay 4 of the Vehicle Assembly Building (VAB). It was towed from the Orbiter Processing Facility (OPF) to allow work to be performed in the bay that can only be accomplished while it is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to- flight mission, STS-114.

  16. KSC-03PD-3191

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. Workers prepare to tow the Space Shuttle orbiter Atlantis from the Orbiter Processing Facility (OPF) to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to- flight mission, STS-114.

  17. KSC-03PD-3204

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. The Space Shuttle orbiter Atlantis arrives in high bay 4 of the Vehicle Assembly Building (VAB). It was towed from the Orbiter Processing Facility (OPF) to allow work to be performed in the bay that can only be accomplished while it is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to- flight mission, STS-114.

  18. KSC-03PD-3206

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. Workers walk with Space Shuttle orbiter Atlantis from the Orbiter Processing Facility (OPF) to the Vehicle Assembly Building (VAB) high bay 4. The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  19. KSC-03PD-3190

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. The Space Shuttle orbiter Atlantis is moments away from a tow from the Orbiter Processing Facility (OPF) to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to- flight mission, STS-114.

  20. 36 CFR 1192.101 - Lighting.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Cars and Systems § 1192.101 Lighting. (a) Any stepwell or doorway with a lift, ramp or bridge plate..., ramp, bridge plate, or lift platform. (b) The doorways of cars not operating at lighted station...

  1. 36 CFR 1192.119 - Lighting.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Cars and Systems § 1192.119 Lighting. (a) Any stepwell, or doorway with a lift, ramp or bridge plate..., ramp, bridge plate or lift platform. (b) The doorways of cars not operating at lighted station...

  2. 36 CFR 1192.119 - Lighting.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Cars and Systems § 1192.119 Lighting. (a) Any stepwell, or doorway with a lift, ramp or bridge plate..., ramp, bridge plate or lift platform. (b) The doorways of cars not operating at lighted station...

  3. 36 CFR 1192.101 - Lighting.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Cars and Systems § 1192.101 Lighting. (a) Any stepwell or doorway with a lift, ramp or bridge plate..., ramp, bridge plate, or lift platform. (b) The doorways of cars not operating at lighted station...

  4. 36 CFR 1192.25 - Doors, steps and thresholds.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Contrast. All step edges, thresholds, and the boarding edge of ramps or lift platforms shall have a band of... lift or ramp surface, either light-on-dark or dark-on-light. (c) Door height. For vehicles in excess of 22 feet in length, the overhead clearance between the top of the door opening and the raised lift...

  5. 36 CFR 1192.25 - Doors, steps and thresholds.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Contrast. All step edges, thresholds, and the boarding edge of ramps or lift platforms shall have a band of... lift or ramp surface, either light-on-dark or dark-on-light. (c) Door height. For vehicles in excess of 22 feet in length, the overhead clearance between the top of the door opening and the raised lift...

  6. 49 CFR 38.119 - Lighting.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., or doorway with a lift, ramp or bridge plate, shall have, when the door is open, at least 2 foot-candles of illumination measured on the step tread, ramp, bridge plate or lift platform. (b) The doorways...

  7. 49 CFR 38.119 - Lighting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., or doorway with a lift, ramp or bridge plate, shall have, when the door is open, at least 2 foot-candles of illumination measured on the step tread, ramp, bridge plate or lift platform. (b) The doorways...

  8. 49 CFR 38.101 - Lighting.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... doorway with a lift, ramp or bridge plate shall have, when the door is open, at least 2 footcandles of illumination measured on the step tread, ramp, bridge plate, or lift platform. (b) The doorways of cars not...

  9. 49 CFR 38.101 - Lighting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... doorway with a lift, ramp or bridge plate shall have, when the door is open, at least 2 footcandles of illumination measured on the step tread, ramp, bridge plate, or lift platform. (b) The doorways of cars not...

  10. C. G. Doris participation in the development of Abu-Al-Bu Koosh Field (in English and French)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    On behalf of the total-ABK group, the company, C.G. Doris, has taken an active part in the development of the gas-lift and water injection installations in the Abu-Al-Bu Koosh Fields. The gas lift platform is a 4-legged jacket in 30 m of water with 2 deck levels. It is joined by a bridge to the production platform. Total load of the new platform is 1000 tons of steel plus 200 tons of piles. The 2 water injection tripods in 41 and 27 m of water also are pile-supported jackets with the vertical and 2 inclined legs. Also, the 2 workovermore » platforms have been thoroughly rechecked by C.G. Doris. Furthermore, a living quarters platform was designed and contracted by the company on a turn-key basis. Capacity is 60 people, with a possibility of expansion.« less

  11. A large array of high-performance artificial stars using airship-supported small mirrors

    NASA Astrophysics Data System (ADS)

    Content, Robert; Foxwell, Mark; Murray, Graham J.

    2004-10-01

    We propose a practical system that can provide a large number of high performance artificial stars, of the order of a few hundred, using an array of small mirrors on an airship supported platform illuminated from the ground by a laser. Our concept offers several advantages over other guide star schemes: Airborne mirror arrays can furnish tip-tilt information; they also permit a considerable reduction in the total ground-laser power required; high intensity guide stars with very small angular image size are possible; and finally they offer very low scattered parasite laser light. More basic & simpler launch-laser & AO technologies can therefore be employed, with potentially huge cost savings, with potentially significant improvement in the quality of the AO correction. The general platform scheme and suitable lift technologies are also discussed. A novel concept for achieving precise positioning is presented whereby the platform & the lifting vehicle are linked by a tether, the platform having a degree of independent control. Our proposal would employ as the lift vehicle an autonomous high altitude airship of the type currently under widespread development in the commercial sector, for use as hubs for telecommunication networks, mobile telephone relay stations, etc.

  12. KSC-98pc1136

    NASA Image and Video Library

    1998-09-23

    KENNEDY SPACE CENTER, FLA. -- The Hubble Space Telescope Orbiting Systems Test Platform (HOST) is lifted off its work stand in the Space Station Processing Facility before moving it to its payload canister. One of the payloads on the STS-95 mission, the HOST platform is carrying four experiments to validate components planned for installation during the third Hubble Space Telescope servicing mission and to evaluate new technologies in an Earth-orbiting environment. The STS-95 mission is scheduled to launch Oct. 29. It will carry other payloads such as the Spartan solar-observing deployable spacecraft, the International Extreme Ultraviolet Hitchhiker (IEH-3), and the SPACEHAB single module with experiments on space flight and the aging process

  13. Device for installing rocket engines

    NASA Technical Reports Server (NTRS)

    George, T. R., Jr. (Inventor)

    1976-01-01

    A device for installing rocket engines is reported that is supported at a cant relative to vertical by an axially extensible, tiltable pedestal. A lifting platform supports the rocket engine at its thrust chamber exit, including a mount having a concentric base characterized by a concave bearing surface, a plurality of uniformly spaced legs extended radially from the base, and an annular receiver coaxially aligned with the base and affixed to the distal ends of said legs for receiving the thrust chamber exit. The lifting platform rests on a seat concentrically related to the pedestal and affixed to an extended end portion thereof having a convex bearing surface mated in sliding engagement with the concave bearing surface of the annular base for accommodating a rocking motion of the platform.

  14. New Design Concept for a Lifting Platform Made of Composite Material

    NASA Astrophysics Data System (ADS)

    Solazzi, L.; Scalmana, R.

    2013-08-01

    Elevating work platforms are hoists equipment that are increasingly used in many applications, like in the construction industry and in the maintenance field. The maintenance of the hub of the wind turbines, for example, can be done through the use of a working platform; these structures have to reach great heights and obviously they have to satisfy the constraints induced by the highway standards, like the maximum axle load and the maximum overall dimensions. To satisfy these requests the material of the structures changed from the classic structural steel (S235 JR, S275 JR or S355JR) to high strength steel (S700 to S1100 or more), characterized by a significantly higher specific resistance. The idea of this paper is to use a composite material for the construction of the arms of an elevating platform in order to reduce the global weight of the machine. The analyses on the new kind of platform show the technical possibility to change the material of the arms with composite materials and this produces a significant reduction of the weight of the machine components, about 50 %. Being a feasibility study, still remain open some problems such as the mechanical behavior of the used composite materials (fatigue, environment effects, etc.).

  15. Polyethyleneimine patterns obtained by laser-transfer assisted by a Dynamic Release Layer onto Themanox soft substrates for cell adhesion study

    NASA Astrophysics Data System (ADS)

    Dinca, V.; Mattle, T.; Palla Papavlu, A.; Rusen, L.; Luculescu, C.; Lippert, T.; Dinescu, M.

    2013-08-01

    The use of LIFT (Laser Induced Forward Transfer) for localized and high spatial resolution printing of many types of functional organic and inorganic, biological or synthetic materials onto substrates is an effective method in various domains (electronics, sensors, and surface biofunctionalization). Although extensive research has been dedicated to the LIFT process in the last years, there is an increasing interest for combining the advantages of this technique with specific materials characteristics for obtaining localized structures or for creating physical guidance structures that could be used as biological scaffolds. Within this context, we aim to study a new aspect related to combining the advantages of Dynamic Release Layer assisted LIFT (DRL-LIFT) with a soft substrate (i.e. Thermanox) for obtaining surface functionalization with micro and nano "porous" polymeric structures. The structures obtained with different topographical properties were evaluated by scanning electron microscopy, atomic force microscopy, optical and fluorescence microscopy. Subsequently, the structures were used as a base for cellular behavior study platforms. Preliminary in vitro tests involving two types of cells, fibroblast and oligodendrocytes, were performed on these LIFT printed platforms.

  16. NASA safety standard for lifting devices and equipment

    NASA Astrophysics Data System (ADS)

    1990-09-01

    NASA's minimum safety requirements are established for the design, testing, inspection, maintenance, certification, and use of overhead and gantry cranes (including top running monorail, underhung, and jib cranes), mobile cranes, derrick hoists, and special hoist supported personnel lifting devices (these do not include elevators, ground supported personnel lifts, or powered platforms). Minimum requirements are also addressed for the testing, inspection, and use of Hydra-sets, hooks, and slings. Safety standards are thoroughly detailed.

  17. NASA safety standard for lifting devices and equipment

    NASA Technical Reports Server (NTRS)

    1990-01-01

    NASA's minimum safety requirements are established for the design, testing, inspection, maintenance, certification, and use of overhead and gantry cranes (including top running monorail, underhung, and jib cranes), mobile cranes, derrick hoists, and special hoist supported personnel lifting devices (these do not include elevators, ground supported personnel lifts, or powered platforms). Minimum requirements are also addressed for the testing, inspection, and use of Hydra-sets, hooks, and slings. Safety standards are thoroughly detailed.

  18. KSC-2012-1679

    NASA Image and Video Library

    2012-03-08

    CAPE CANAVERAL, Fla. – Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, technicians begin the work to secure a new engine and generator inside crawler-transporter 2 CT-2). The Apollo era diesel engines were removed last month. Work continues in high bay 2 to upgrade CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket, which is under design, and new Orion spacecraft to the launch pad. The crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Jim Grossmann

  19. KSC-2012-1680

    NASA Image and Video Library

    2012-03-08

    CAPE CANAVERAL, Fla. – Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, technicians begin the work to secure a new engine and generator inside crawler-transporter 2 CT-2). The Apollo era diesel engines were removed last month. Work continues in high bay 2 to upgrade CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket, which is under design, and new Orion spacecraft to the launch pad. The crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Jim Grossmann

  20. Autonomous robotic platforms for locating radio sources buried under rubble

    NASA Astrophysics Data System (ADS)

    Tasu, A. S.; Anchidin, L.; Tamas, R.; Paun, M.; Danisor, A.; Petrescu, T.

    2016-12-01

    This paper deals with the use of autonomous robotic platforms able to locate radio signal sources such as mobile phones, buried under collapsed buildings as a result of earthquakes, natural disasters, terrorism, war, etc. This technique relies on averaging position data resulting from a propagation model implemented on the platform and the data acquired by robotic platforms at the disaster site. That allows us to calculate the approximate position of radio sources buried under the rubble. Based on measurements, a radio map of the disaster site is made, very useful for locating victims and for guiding specific rubble lifting machinery, by assuming that there is a victim next to a mobile device detected by the robotic platform; by knowing the approximate position, the lifting machinery does not risk to further hurt the victims. Moreover, by knowing the positions of the victims, the reaction time is decreased, and the chances of survival for the victims buried under the rubble, are obviously increased.

  1. 29 CFR 1918.65 - Mechanically powered vehicles used aboard vessels.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... means of engagement hidden from the operator, a means shall be provided to enable the operator to... or swung over any employee. (7) When mechanically powered vehicles are used, provisions shall be made... employee may be elevated by fork lift trucks only when a platform is secured to the lifting carriage or...

  2. 29 CFR 1917.43 - Powered industrial trucks.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... engagement hidden from the operator, a means shall be provided to enable the operator to determine that the... employees. Employees may be elevated by fork lift trucks only when a platform is secured to the lifting...) if tools or other objects could fall on employees below. (iii) An employee shall be at the truck's...

  3. 29 CFR 1918.65 - Mechanically powered vehicles used aboard vessels.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... means of engagement hidden from the operator, a means shall be provided to enable the operator to... or swung over any employee. (7) When mechanically powered vehicles are used, provisions shall be made... employee may be elevated by fork lift trucks only when a platform is secured to the lifting carriage or...

  4. 29 CFR 1917.43 - Powered industrial trucks.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... engagement hidden from the operator, a means shall be provided to enable the operator to determine that the... employees. Employees may be elevated by fork lift trucks only when a platform is secured to the lifting...) if tools or other objects could fall on employees below. (iii) An employee shall be at the truck's...

  5. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pallesen, T.R.; Braestrup, M.W.; Jorgensen, O.

    Development of Danish North Sea hydrocarbon resources includes the 17-km Rolf pipeline installed in 1985. This one consists of an insulated 8-in. two-phase flow product line with a 3-in. piggyback gas lift line. A practical solution to design of this insulated pipeline, including the small diameter, piggyback injection line was corrosion coating of fusion bonded epoxy (FBE) and polyethylene (PE) sleeve pipe. The insulation design prevents hydrate formation under the most conservative flow regime during gas lift production. Also, the required minimum flow rate during the initial natural lift period is well below the value anticipiated at the initiation ofmore » gas lift. The weight coating design ensures stability on the seabed during the summer months only; thus trenching was required during the same installation season. Installation of insulated flowlines serving marginal fields is a significant feature of North Sea hydrocarbon development projects. The Skjold field is connected to Gorm by a 6-in., two-phase-flow line. The 11-km line was installed in 1982 as the first insulated pipeline in the North Sea. The Rolf field, located 17 km west of Gorm, went on stream Jan. 2. The development includes an unmanned wellhead platform and an insulated, two-phase-flow pipeline to the Gorm E riser platform. After separation on the Gorm C process platform, the oil and condensate are transported to shore through the 20-in. oil pipeline, and the natural gas is piped to Tyra for transmission through the 30-in. gas pipeline. Oil production at Rolf is assisted by the injection of lift gas, transported from Gorm through a 3-in. pipeline, installed piggyback on the insulated 8-in. product line. The seabed is smooth and sandy, the water depth varying between 33.7 m (110.5 ft) at Rolf and 39.1 m (128 ft) at Gorm.« less

  6. Launch Vehicle Demonstrator Using Shuttle Assets

    NASA Technical Reports Server (NTRS)

    Threet, Grady E., Jr.; Creech, Dennis M.; Philips, Alan D.; Water, Eric D.

    2011-01-01

    The Marshall Space Flight Center Advanced Concepts Office (ACO) has the leading role for NASA s preliminary conceptual launch vehicle design and performance analysis. Over the past several years the ACO Earth-to-Orbit Team has evaluated thousands of launch vehicle concept variations for a multitude of studies including agency-wide efforts such as the Exploration Systems Architecture Study (ESAS), Constellation, Heavy Lift Launch Vehicle (HLLV), Heavy Lift Propulsion Technology (HLPT), Human Exploration Framework Team (HEFT), and Space Launch System (SLS). NASA plans to continue human space exploration and space station utilization. Launch vehicles used for heavy lift cargo and crew will be needed. One of the current leading concepts for future heavy lift capability is an inline one and a half stage concept using solid rocket boosters (SRB) and based on current Shuttle technology and elements. Potentially, the quickest and most cost-effective path towards an operational vehicle of this configuration is to make use of a demonstrator vehicle fabricated from existing shuttle assets and relying upon the existing STS launch infrastructure. Such a demonstrator would yield valuable proof-of-concept data and would provide a working test platform allowing for validated systems integration. Using shuttle hardware such as existing RS-25D engines and partial MPS, propellant tanks derived from the External Tank (ET) design and tooling, and four-segment SRB s could reduce the associated upfront development costs and schedule when compared to a concept that would rely on new propulsion technology and engine designs. There are potentially several other additional benefits to this demonstrator concept. Since a concept of this type would be based on man-rated flight proven hardware components, this demonstrator has the potential to evolve into the first iteration of heavy lift crew or cargo and serve as a baseline for block upgrades. This vehicle could also serve as a demonstration and test platform for the Orion Program. Critical spacecraft systems, re-entry and recovery systems, and launch abort systems of Orion could also be demonstrated in early test flights of the launch vehicle demo. Furthermore, an early demonstrator of this type would provide a stop-gap for retaining critical human capital and infrastructure while affording the current emerging generation of young engineers opportunity to work with and capture lessons learned from existing STS program offices and personnel, who were integral in the design and development of the Space Shuttle before these resources are no longer available. The objective of this study is to define candidate launch vehicle demonstration concepts that are based on Space Shuttle assets and determine their performance capabilities and how these demonstration vehicles could evolve to a heavy lift capability to low earth orbit.

  7. KSC-2012-6175

    NASA Image and Video Library

    2012-11-05

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, a space shuttle era mobile launcher platform, on the left, sits on pedestals outside the Vehicle Assembly Building. To the right is the mobile launcher that will support the space agency's Space Launch System heavy-lift rocket and Orion spacecraft. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles projects to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/Jim Grossmann

  8. Three-Point Gear/Lead Screw Positioning

    NASA Technical Reports Server (NTRS)

    Calco, Frank S.

    1993-01-01

    Triple-ganged-lead-screw positioning mechanism drives movable plate toward or away from fixed plate and keeps plates parallel to each other. Designed for use in tuning microwave resonant cavity. Other potential applications include adjustable bed plates and cantilever tail stocks in machine tools, adjustable platforms for optical equipment, and lifting platforms.

  9. 2007 Expeditionary Warfare Conference (12th)

    DTIC Science & Technology

    2007-10-25

    Ships 10 Joint High Speed Vessel (JHSV) Today • Program Capability – High speed lift ship capable of transporting cargo and personnel across...develop technologies that will: – Improve the capability to transfer cargo between Sea Base platforms – Provide for high speed / heavy lift...state actors for legitimacy and influence over the relevant population” Joint High Speed Vessel In-Service Amphibs LCAC & Ship to Shore

  10. A novel robotic platform for single-port abdominal surgery

    NASA Astrophysics Data System (ADS)

    Singh, Satwinder; Cheung, Jo L. K.; Sreedhar, Biji; Hoa, Xuyen Dai; Ng, Hoi Pang; Yeung, Chung Kwong

    2018-03-01

    In this paper, a novel robot-assisted platform for single-port minimally invasive surgery is presented. A miniaturized seven degrees of freedom (dof) fully internalized in-vivo actuated robotic arm is designed. Due to in-vivo actuation, the system has a smaller footprint and can generate 20 N of gripping force. The complete work envelop of the robotic arms is 252 mm × 192 mm × 322 m. With the assistance of the cannula-swivel system, the robotic arms can also be re-positioned and have multi-quadrant reachability without any additional incision. Surgical tasks, such as lifting, gripping suturing and knot tying that are commonly used in a standard surgical procedure, were performed to verify the dexterity of the robotic arms. A single-port trans-abdominal cholecystectomy in a porcine model was successfully performed to further validate its functionality.

  11. Effects of height and load weight on shoulder muscle work during overhead lifting task.

    PubMed

    Blache, Y; Desmoulins, L; Allard, P; Plamondon, A; Begon, M

    2015-01-01

    Few musculoskeletal models are available to assess shoulder deeper muscle demand during overhead lifting tasks. Our objective was to implement a musculoskeletal model to assess the effect of lifting height and load on shoulder muscle work. A musculoskeletal model scaled from 15 male subjects was used to calculate shoulder muscle work during six lifting tasks. Boxes containing three different loads (6, 12 and 18 kg) were lifted by the subjects from the waist to shoulder or eye level. After optimisation of the maximal isometric force of the model's muscles, the bio-fidelity of the model was improved by 19%. The latter was able to reproduce the subjects' lifting movements. Mechanical work of the rotator cuff muscles, upper trapezius and anterior deltoid was increased with lifting load and height augmentation. In conclusion, the use of a musculoskeletal model validated by electromyography enabled to evaluate the muscle demand of deep muscles during lifting tasks.

  12. KSC-2012-1670

    NASA Image and Video Library

    2012-03-08

    CAPE CANAVERAL, Fla. – Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, new engines and generators have arrived for installation on crawler-transporter 2 CT-2). The Apollo era diesel engines were removed last month. Work continues in high bay 2 to upgrade CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket, which is under design, and new Orion spacecraft to the launch pad. The crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Jim Grossmann

  13. KSC-2012-1343

    NASA Image and Video Library

    2012-02-15

    CAPE CANAVERAL, Fla. –– Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, technicians prepare an Apollo era diesel engine inside crawler-transporter 2 CT-2) for removal. New engines will be installed later this month. Work is in progress in high bay 2 to upgrade CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket, which is under design, and new Orion spacecraft to the launch pad. The crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Kim Shiflett

  14. KSC-2012-1671

    NASA Image and Video Library

    2012-03-08

    CAPE CANAVERAL, Fla. – Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, a new engine and generator have arrived for installation on crawler-transporter 2 CT-2). The Apollo era diesel engines were removed last month. Work continues in high bay 2 to upgrade CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket, which is under design, and new Orion spacecraft to the launch pad. The crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Jim Grossmann

  15. KSC-2012-1672

    NASA Image and Video Library

    2012-03-08

    CAPE CANAVERAL, Fla. – Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, technicians prepare a new engine and generator for installation on crawler-transporter 2 CT-2). The Apollo era diesel engines were removed last month. Work continues in high bay 2 to upgrade CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket, which is under design, and new Orion spacecraft to the launch pad. The crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Jim Grossmann

  16. Echo State Networks for data-driven downhole pressure estimation in gas-lift oil wells.

    PubMed

    Antonelo, Eric A; Camponogara, Eduardo; Foss, Bjarne

    2017-01-01

    Process measurements are of vital importance for monitoring and control of industrial plants. When we consider offshore oil production platforms, wells that require gas-lift technology to yield oil production from low pressure oil reservoirs can become unstable under some conditions. This undesirable phenomenon is usually called slugging flow, and can be identified by an oscillatory behavior of the downhole pressure measurement. Given the importance of this measurement and the unreliability of the related sensor, this work aims at designing data-driven soft-sensors for downhole pressure estimation in two contexts: one for speeding up first-principle model simulation of a vertical riser model; and another for estimating the downhole pressure using real-world data from an oil well from Petrobras based only on topside platform measurements. Both tasks are tackled by employing Echo State Networks (ESN) as an efficient technique for training Recurrent Neural Networks. We show that a single ESN is capable of robustly modeling both the slugging flow behavior and a steady state based only on a square wave input signal representing the production choke opening in the vertical riser. Besides, we compare the performance of a standard network to the performance of a multiple timescale hierarchical architecture in the second task and show that the latter architecture performs better in modeling both large irregular transients and more commonly occurring small oscillations. Copyright © 2016 Elsevier Ltd. All rights reserved.

  17. MSFC-1700825

    NASA Image and Video Library

    2017-07-10

    The Orion stage adapter is being positioned for lifting onto the loading platform before being loaded into NASA's Super Guppie aircraft. The adapter will be flown to Denver, Colorado for further testing.

  18. MSFC-1700827

    NASA Image and Video Library

    2017-07-10

    The Orion stage adapter is being positioned for lifting onto the loading platform before being loaded into NASA's Super Guppie aircraft. The adapter will be flown to Denver, Colorado for further testing.

  19. MSFC-1700828

    NASA Image and Video Library

    2017-07-10

    The Orion stage adapter is being positioned for lifting onto the loading platform before being loaded into NASA's Super Guppie aircraft. The adapter will be flown to Denver, Colorado for further testing.

  20. MSFC-1700823

    NASA Image and Video Library

    2017-07-10

    The Orion stage adapter is being positioned for lifting onto the loading platform before being loaded into NASA's Super Guppie aircraft. The adapter will be flown to Denver, Colorado for further testing.

  1. MSFC-1700826

    NASA Image and Video Library

    2017-07-10

    The Orion stage adapter is being positioned for lifting onto the loading platform before being loaded into NASA's Super Guppie aircraft. The adapter will be flown to Denver, Colorado for further testing.

  2. MSFC-1700822

    NASA Image and Video Library

    2017-07-10

    The Orion stage adapter is being positioned for lifting onto the loading platform before being loaded into NASA's Super Guppie aircraft. The adapter will be flown to Denver, Colorado for further testing.

  3. MSFC-1700824

    NASA Image and Video Library

    2017-07-10

    The Orion stage adapter is being positioned for lifting onto the loading platform before being loaded into NASA's Super Guppie aircraft. The adapter will be flown to Denver, Colorado for further testing.

  4. External Payload Carrier (XPC) - A Novel Platform for Suborbital Research

    NASA Technical Reports Server (NTRS)

    Schallhorn, Paul; Groves, Curtis; Tatro, Charles; Kutter, Bernard; Szatkowski, Gerald; Bulk, Tim; Pitchford, Brian

    2010-01-01

    ULA, SAS, and NASA LSP are examining a new platform for suborbital research utilizing the Atlas V Launch Vehicle. The new platform, XPC, fills a new niche within the suborbital realm Large Heavy Lift (approximately 1200 cubic feet, 5000 lb payload). It will not compete with the commercial suborbital launch sector. The XPC will utilize excess performance on Atlas V missions. The Preliminary Design phase is recently underway. The XPC team is soliciting input from potential users.

  5. Musculoskeletal pain among critical-care nurses by availability and use of patient lifting equipment: an analysis of cross-sectional survey data.

    PubMed

    Lee, Soo-Jeong; Faucett, Julia; Gillen, Marion; Krause, Niklas

    2013-12-01

    Patient handling is a major risk factor for musculoskeletal injuries among nurses. Lifting equipment is a main component of safe patient handling programs that aim to prevent musculoskeletal injury. However, the actual levels of lift availability and usage are far from optimal. To examine the effect of patient lifting equipment on musculoskeletal pain by level of lift availability and lift use among critical-care nurses. A cross-sectional postal survey of a random sample of 361 critical-care nurses in the United States. The survey collected data on low-back, neck, and shoulder pain, lift availability, lift use, physical and psychosocial job factors, and sociodemographics. Musculoskeletal pain was assessed by three types of measures: any pain, work-related pain, and major pain. Multivariable logistic regressions were used to examine the associations between musculoskeletal pain and lift variables, controlling for demographic and job factors. Less than half (46%) of respondents reported that their employer provided lifts. Of 168 nurses who had lifts in their workplace, the level of lift availability was high for 59.5%, medium for 25.0%, and low for 13.7%; the level of lift use was high for 32.1%, medium for 31.5%, and low for 31.5%. Significant associations were found between lift availability and work-related low-back and shoulder pain. Compared to nurses without lifts, nurses reporting high-level lift availability were half as likely to have work-related low-back pain (OR=0.50, 95% CI 0.26-0.96) and nurses reporting medium-level lift availability were 3.6 times less likely to have work-related shoulder pain (OR=0.28, 95% CI 0.09-0.91). With respect to lift use, work-related shoulder pain was three times less common among nurses reporting medium-level use (OR=0.33, 95% CI 0.12-0.93); any neck pain was three times more common among nurses reporting low-level use (OR=3.13, 95% CI 1.19-8.28). Greater availability and use of lifts were associated with less musculoskeletal pain among critical-care nurses. These findings suggest that for lift interventions to be effective, lifts must be readily available when needed and barriers against lift use must be removed. Copyright © 2013 Elsevier Ltd. All rights reserved.

  6. An Analytical Approach to Prioritizing the Development of Seabasing Components

    DTIC Science & Technology

    2007-04-05

    high - speed ferries. The ships have served in intra-theater lift roles worldwide, as a staging platform for SOF during OIF, and as a ...testing. If Seabasing is to reach its full potential, a concerted effort needs to be made to develop a long-range, high - speed , heavy-lift cargo ...deck, high speed , containerized amphibious aircraft carriers) and aircraft (large, long range, naval airlift). A lot of money and energy will

  7. 21 CFR 890.3930 - Wheelchair elevator.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... for Safety—Collateral Standard: Electromagnetic Compatibility—Requirements and Tests,” and ASME A18.1 “Safety Standard for Platform Lifts and Stairway Chair Lifts”) must validate electromagnetic compatibility...

  8. 21 CFR 890.3930 - Wheelchair elevator.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... for Safety—Collateral Standard: Electromagnetic Compatibility—Requirements and Tests,” and ASME A18.1 “Safety Standard for Platform Lifts and Stairway Chair Lifts”) must validate electromagnetic compatibility...

  9. 21 CFR 890.5150 - Powered patient transport.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Standard: Electromagnetic Compatibility—Requirements and Tests,” and ASME A18.1 “Safety Standard for Platform Lifts and Stairway Chair Lifts”) must validate electromagnetic compatibility and electrical safety...

  10. 21 CFR 890.5150 - Powered patient transport.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Standard: Electromagnetic Compatibility—Requirements and Tests,” and ASME A18.1 “Safety Standard for Platform Lifts and Stairway Chair Lifts”) must validate electromagnetic compatibility and electrical safety...

  11. Platform C North Arrival

    NASA Image and Video Library

    2016-08-30

    A section of the second half of the C-level platforms, C North, for NASA’s Space Launch System (SLS) rocket, arrives at the agency’s Kennedy Space Center in Florida. The platform was offloaded from a heavy lift transport truck and secured in a staging area in the west parking lot of the Vehicle Assembly Building (VAB). The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3 to support processing of the SLS and Orion spacecraft. A total of 10 levels of new platforms, 20 platform halves altogether, will surround the SLS rocket and Orion spacecraft and provide access for testing and processing.

  12. 76 FR 57924 - Transportation for Individuals With Disabilities at Intercity, Commuter, and High Speed Passenger...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-19

    ... station platforms, that passengers with disabilities can get on and off any accessible car of the train... train car that other passengers can board at the station. These means include providing car-borne lifts... disabilities can get on and off any accessible car that is available to passengers at a station platform. At...

  13. Testing of lift/cruise fan exhaust deflector. [for a tip turbine lift fan in short takeoff aircraft

    NASA Technical Reports Server (NTRS)

    Schlundt, D. W.

    1975-01-01

    A lift/cruise exhaust deflector system for the LF336/A tip turbine lift fan was designed, built, and tested to determine the design and performance characteristics of a large-scale, single swivel nozzle thrust vectoring system. The exhaust deflector static testing was performed at the Ames Research Center outside static test stand facilities. The test hardware was installed on a hydraulic lift platform to permit both in and out of ground effect testing. The exhaust flow of the LF336/A lift fan was vectored from 0 degrees through 130 degrees during selected fan speeds to obtain performance at different operating conditions. The system was operated with and without flow vanes installed in the small radius bends to evaluate the system performance based on a proposed method of improving the internal flow losses. The program also included testing at different ground heights, to the nozzle exhaust plane, to obtain ground effect data, and the testing of two methods of thrust spoiling using a duct bypass door system and nozzle flap system.

  14. 29 CFR 1926.952 - Mechanical equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Aerial lifts. (1) The provisions of § 1926.556, subpart N of this part, shall apply to the utilization of aerial lifts. (2) When working near energized lines or equipment, aerial lift trucks shall be grounded or barricaded and considered as energized equipment, or the aerial lift truck shall be insulated for the work...

  15. 29 CFR 1926.952 - Mechanical equipment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Aerial lifts. (1) The provisions of § 1926.556, subpart N of this part, shall apply to the utilization of aerial lifts. (2) When working near energized lines or equipment, aerial lift trucks shall be grounded or barricaded and considered as energized equipment, or the aerial lift truck shall be insulated for the work...

  16. NASA's Space Launch System: A Heavy-Lift Platform for Entirely New Missions

    NASA Technical Reports Server (NTRS)

    Creech, Stephen D.

    2012-01-01

    The National Aeronautics and Space Administration's (NASA's) Space Launch System (SLS) will contribute a new capability for human space flight and scientific missions beyond low-Earth orbit (LEO). The SLS Program, managed at NASA s Marshall Space Flight Center, will develop the heavy-lift vehicle that will launch the Orion Multi-Purpose Crew Vehicle (MPCV), equipment, supplies, and major science missions for exploration and discovery. Orion will carry crews to space, provide emergency abort capability, sustain the crew during space travel, and provide safe reentry from deep-space return velocities. Supporting Orion s first autonomous flight to lunar orbit and back in 2017 and its first crewed flight in 2021, the SLS ultimately offers a flexible platform for both human and scientific exploration. The SLS plan leverages legacy infrastructure and hardware in NASA s inventory, as well as continues with advanced technologies now in development, to deliver an initial 70 metric ton (t) lift capability in 2017, evolving to a 130-t capability, using a block upgrade approach. This paper will give an overview of the SLS design and management approach against a backdrop of the missions it will support. It will detail the plan to deliver the initial SLS capability to the launch pad in the near term, as well as summarize the innovative approaches the SLS team is applying to deliver a safe, affordable, and sustainable long-range capability for entirely new missions-opening a new realm of knowledge and a world of possibilities for multiple partners. Design reference missions that the SLS is being planned to support include Mars, Jupiter, Lagrange Points, and near-Earth asteroids (NEAs), among others. The Agency is developing its mission manifest in parallel with the development of a heavy-lift flagship that will dramatically increase total lift and volume capacity beyond current launch vehicle options, reduce trip times, and provide a robust platform for conducting new missions destined to rewrite textbooks with the information they deliver, while creating a framework for further collaboration among domestic and international partners, and potentially spurring economic expansion into new markets.

  17. NASA's Space Launch System: A Heavy-Lift Platform for Entirely New Missions

    NASA Technical Reports Server (NTRS)

    Creech, Stephen A.

    2012-01-01

    The National Aeronautics and Space Administration s (NASA's) Space Launch System (SLS) will contribute a new capability for human space flight and scientific missions beyond low-Earth orbit. The SLS Program, managed at NASA s Marshall Space Fight Center, will develop the heavy-lift vehicle that will launch the Orion Multi-Purpose Crew Vehicle (MPCV), equipment, supplies, and major science missions. Orion will carry crews to space, provide emergency abort capability, sustain the crew during space travel, and provide safe reentry from deep-space return velocities. Supporting Orion s first autonomous flight to lunar orbit and back in 2017 and its first crewed flight in 2021, the SLS ultimately offers a flexible platform for both human and scientific exploration. The SLS plan leverages legacy infrastructure and hardware in NASA s inventory, as well as continues with advanced propulsion technologies now in development, to deliver an initial 70 metric ton (t) lift capability in 2017, evolving to a 130-t capability after 2021, using a block upgrade approach. This paper will give an overview of the SLS design and management approach against a backdrop of the missions it will support. It will detail the plan to deliver the initial SLS capability to the launch pad in the near term, as well as summarize the innovative approaches the SLS team is applying to deliver a safe, affordable, and sustainable long-range capability for entirely new missions opening a new realm of knowledge and a world of possibilities for multiple partners. Design reference missions that the SLS is being planned to support include asteroids, Lagrange Points, and Mars, among others. The Agency is developing its mission manifest in parallel with the development of a heavy-lift flagship that will dramatically increase total lift and volume capacity beyond current launch vehicle options, reduce trip times, and provide a robust platform for conducting new missions destined to rewrite textbooks with the information they deliver, while creating a framework for further collaboration among domestic and international partners, and potentially spurring economic expansion into new markets.

  18. Computational Fluid Dynamics (CFD) Simulations of a Humvee Airdropped from Aircraft

    NASA Astrophysics Data System (ADS)

    Reyes, Phillip M.

    Military airdrop is a means of transporting and delivering cargo to inaccessible locales faster and more efficiently. The Humvee, an all-terrain truck, is one such payload that the U.S. Army drops routinely. Here, interesting physics occurs both structurally and aerodynamically. From a fluid dynamics and trajectory standpoint, determining the aerodynamic forces and moments acting on the parachute and payload is crucial particularly for trajectory prediction. This study primarily used Computational Fluid Dynamics (CFD) to simulate the aerodynamics of an airdrop Humvee model in two regimes of fall, namely, right after clearing the aircraft ramp, and during descent under parachute. This study was performed at a Reynolds number of 3.07x10. 6 and at an airspeedof 9.144m/s (30ft/s). The first humvee part of the study analyzed the aerodynamic coefficients drag, lift, and pitching moment over a 360 degree range of pitch angles for the Humvee configured for extraction. The second set of humvee simulations focused on the aerodynamic coefficients at pitch angles of -40 degrees to +40 degrees with the platform and vehicle configured for descent under parachute. The Humvee after ramp tip-off has a parachute pack on its hood, but lacks one during the descent phase. The numerical data was compared with the results of geometries from previous studies. These geometries include: the flat plate, Type-V LVADS and 10K-JPADS containers, and a cargo-carrying platform outfitted with a bumper. Our results clearly show the effects of the many angular features that characterize the shape of a Humvee in comparison to those of a simple cuboid, particularly with regards to the loss of lift in a sub-range of pitch angle (-45 degrees to -180 degrees). First, the aerodynamic coefficients were calculated over one full-revolution of the humvee (-180 degrees to +180 degrees static pitch angles with respect to the humvee's platform) best matched in lift, drag, and moment those of the type V LVADS payload analyzed in a previous study. Here, three important findings emerge: (1) Lift is not symmetric with positive to negative angles and more so, lift is negligible at pitch angles less than -45 degrees (2) the humvee-platofrm may be considered stable when oriented perpendicular to the flow (both 90 degrees and -90 degrees); (3) there is a range of pitch angle (52 degrees to 117 degrees) where the lift coefficient is linearly dependent on angle of attack. This is the orientation at which the oncoming flow meets the platform first (i.e. before moving past the humvee's body), thereby producing a forward-projected area similar to that of a flat-plate. The second part of the study (descent under parachute) also shows a similar result. Negative pitch angles show a continual increase in lift and moment coefficients, whereas for positive pitch angles at 30 degrees and 40 degrees the negative lift values do not decrease as fast as earlier positive pitch angles. This difference is explained with pressure coefficient curves. Validation of our CFD modeling is also discussed, with the presentation of numerical results generated on benchmark cases such as the flows about flat plates held at various pitch angles.

  19. Aerodynamic Assessment of Flight-Determined Subsonic Lift and Drag Characteristics of Seven Lifting-Body and Wing-Body Reentry Vehicle Configurations

    NASA Technical Reports Server (NTRS)

    Saltzman, Edwin J.; Wang, K. Charles; Iliff, Kenneth W.

    2002-01-01

    This report examines subsonic flight-measured lift and drag characteristics of seven lifting-body and wing-body reentry vehicle configurations with truncated bases. The seven vehicles are the full-scale M2-F1, M2-F2, HL-10, X-24A, X-24B, and X-15 vehicles and the Space Shuttle Enterprise. Subsonic flight lift and drag data of the various vehicles are assembled under aerodynamic performance parameters and presented in several analytical and graphical formats. These formats are intended to unify the data and allow a greater understanding than individually studying the vehicles allows. Lift-curve slope data are studied with respect to aspect ratio and related to generic wind-tunnel model data and to theory for low-aspect-ratio platforms. The definition of reference area is critical for understanding and comparing the lift data. The drag components studied include minimum drag coefficient, lift-related drag, maximum lift-to drag ratio, and, where available, base pressure coefficients. The influence of forebody drag on afterbody and base drag at low lift is shown to be related to Hoerner's compilation for body, airfoil, nacelle, and canopy drag. This feature may result in a reduced need of surface smoothness for vehicles with a large ratio of base area to wetted area. These analyses are intended to provide a useful analytical framework with which to compare and evaluate new vehicle configurations of the same generic family.

  20. KSC-2011-8283

    NASA Image and Video Library

    2011-12-13

    CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, technicians monitor the progress as a special crane lifts one of the three fuel cells away from space shuttle Atlantis’ for securing on a special platform. The fuel cells will be drained of all fluids. The hydrogen and oxygen dewars which feed reactants to the fuel cells remain in Atlantis’ mid-body and will be purged with inert gases and vented down. The work is part of the Space Shuttle Program’s transition and retirement processing of shuttle Atlantis. The orbiter is being prepared for display at the Kennedy Space Center Visitor Complex. Photo credit: NASA/Kim Shiflett

  1. KSC-2012-1678

    NASA Image and Video Library

    2012-03-08

    CAPE CANAVERAL, Fla. – Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, technicians monitor the progress as a large crane lowers a new engine and generator for installation inside crawler-transporter 2 CT-2). The Apollo era diesel engines were removed last month. Work continues in high bay 2 to upgrade CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket, which is under design, and new Orion spacecraft to the launch pad. The crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Jim Grossmann

  2. KSC-2012-1336

    NASA Image and Video Library

    2012-02-15

    CAPE CANAVERAL, Fla. –Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, a crane is lowered toward crawler-transporter 2 CT-2) so that the Apollo era diesel engine can be removed. New engines will be installed later this month. Work is in progress in high bay 2 to upgrade CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket, which is under design, and new Orion spacecraft to the launch pad. The crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Kim Shiflett

  3. KSC-2012-1334

    NASA Image and Video Library

    2012-02-15

    CAPE CANAVERAL, Fla. – Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, a crane is lowered toward crawler-transporter 2 CT-2) so that the Apollo era diesel engine can be removed. New engines will be installed later this month. Work is in progress in high bay 2 to upgrade CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket, which is under design, and new Orion spacecraft to the launch pad. The crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Kim Shiflett

  4. Payload canister for Discovery is lifted in place for transfer

    NASA Technical Reports Server (NTRS)

    1998-01-01

    At left, the payload canister for Space Shuttle Discovery is lifted from its canister movement vehicle to the top of the Rotating Service Structure on Launch Pad 39-B. Discovery (right), sitting atop the Mobile Launch Platform and next to the Fixed Service Structure (FSS), is scheduled for launch on Oct. 29, 1998, for the STS-95 mission. That mission includes the International Extreme Ultraviolet Hitchhiker (IEH-3), the Hubble Space Telescope Orbital Systems Test Platform, the Spartan solar- observing deployable spacecraft, and the SPACEHAB single module with experiments on space flight and the aging process. At the top of the FSS can be seen the 80-foot lightning mast . The 4- foot-high lightning rod on top helps prevent lightning current from passing directly through the Space Shuttle and the structures on the pad.

  5. Lifting Entry & Atmospheric Flight (LEAF) System Concept Applications at Solar System Bodies With an Atmosphere

    NASA Astrophysics Data System (ADS)

    Lee, Greg; Polidan, Ronald; Ross, Floyd; Sokol, Daniel; Warwick, Steve

    2015-11-01

    Northrop Grumman and L’Garde have continued the development of a hypersonic entry, semi-buoyant, maneuverable platform capable of performing long-duration (months to a year) in situ and remote measurements at any solar system body that possesses an atmosphere.The Lifting Entry & Atmospheric Flight (LEAF) family of vehicles achieves this capability by using a semi-buoyant, ultra-low ballistic coefficient vehicle whose lifting entry allows it to enter the atmosphere without an aeroshell. The mass savings realized by eliminating the heavy aeroshell allows significantly more payload to be accommodated by the platform for additional science collection and return.In this presentation, we discuss the application of the LEAF system at various solar system bodies: Venus, Titan, Mars, and Earth. We present the key differences in platform design as well as operational differences required by the various target environments. The Venus implementation includes propulsive capability to reach higher altitudes during the day and achieves full buoyancy in the mid-cloud layer of Venus’ atmosphere at night.Titan also offers an attractive operating environment, allowing LEAF designs that can target low or medium altitude operations, also with propulsive capabilities to roam within each altitude regime. The Mars version is a glider that descends gradually, allowing targeted delivery of payloads to the surface or high resolution surface imaging. Finally, an Earth version could remain in orbit in a stowed state until activated, allowing rapid response type deployments to any region of the globe.

  6. Effects of a Belt on Intra-Abdominal Pressure during Weight Lifting

    DTIC Science & Technology

    1989-01-01

    N. FRYKMAN, and GEORGE A. NIGRO 8DEC 198 E.yercise Phisiology Division, US. Arn Research Institute of Environmental Medicine, Natick, MA, 01760 (-_3...belt, with no statistical force platform while nine subjects aged 28.2 ± 6.6 yr dead-lifted a evaluation reported. Magnitude of lAP has been found...S 8 mlsoefeale information was collected on the subject’s age , height, Age 28.2 ± 6.6 yr and weight. Instructions were given on catheter inser- Body

  7. Evaluation of team lifting on work demands, workload and workers' evaluation: an observational field study.

    PubMed

    Visser, Steven; van der Molen, Henk F; Kuijer, P Paul F M; Hoozemans, Marco J M; Frings-Dresen, Monique H W

    2014-11-01

    The objective of this study was to assess differences in work demands, energetic workload and workers' discomfort and physical effort in two regularly observable workdays in ironwork; one where loads up to 50kg were handled with two persons manually (T50) and one where loads up to 100kg were handled manually with four persons (T100). Differences between these typical workdays were assessed with an observational within-subject field study of 10 ironworkers. No significant differences were found for work demands, energetic workload or discomfort between T50 and T100 workdays. During team lifts, load mass exceeded 25kg per person in 57% (T50 workday) and 68% (T100 workday) of the lifts. Seven ironworkers rated team lifting with two persons as less physically demanding compared with lifting with four persons. When loads heavier than 25kg are lifted manually with a team, regulations of the maximum mass weight are frequently violated. Loads heavier than 25kg are frequently lifted during concrete reinforcement work and should be lifted by a team of persons. However, the field study showed that loads above 25kg are most of the time not lifted with the appropriate number of workers. Therefore, loads heavier than 25kg should be lifted mechanically. Copyright © 2014 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  8. Small-volume multiparametric electrochemical detection at low cost polymeric devices featuring nanoelectrodes

    NASA Astrophysics Data System (ADS)

    Kitsara, Maria; Cirera, Josep Maria; Aller-Pellitero, Miguel; Sabaté, Neus; Punter, Jaume; Colomer-Farrarons, Jordi; Miribel-Català, Pere; del Campo, F. Javier

    2015-06-01

    The development of a low-cost multiparametric platform for enzymatic electrochemical biosensing that can be integrated in a disposable, energy autonomous analytical device is the target of the current work. We propose a technology to fabricate nano-electrodes and ultimately biosensors on flexible polymeric-based substrates (cyclo olefin polymer, and polyimide) using standard microfabrication (step and repeat lithography and lift-off) and rapid prototyping techniques (blade cutting). Our target is towards the fabrication of a miniaturized prototype that can work with small sample volumes in the range of 5-10μL without the need for external pumps for sample loading and handling. This device can be used for the simultaneous detection of metabolites such as glucose, cholesterol and triglycerides for the early diagnosis of diabetes.

  9. 77 FR 42432 - Drawbridge Operation Regulations; Niantic River, Niantic, CT

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-19

    ... work on machinery and the lift span. DATES: This deviation is effective from 9 p.m. on July 15, 2012... order to facilitate completion of machinery installation and lift span work at the new railroad bridge... and lift span work may continue. This scenario was presented to the Amtrak Annual Boaters Meeting on...

  10. Parametric Deformation of Discrete Geometry for Aerodynamic Shape Design

    NASA Technical Reports Server (NTRS)

    Anderson, George R.; Aftosmis, Michael J.; Nemec, Marian

    2012-01-01

    We present a versatile discrete geometry manipulation platform for aerospace vehicle shape optimization. The platform is based on the geometry kernel of an open-source modeling tool called Blender and offers access to four parametric deformation techniques: lattice, cage-based, skeletal, and direct manipulation. Custom deformation methods are implemented as plugins, and the kernel is controlled through a scripting interface. Surface sensitivities are provided to support gradient-based optimization. The platform architecture allows the use of geometry pipelines, where multiple modelers are used in sequence, enabling manipulation difficult or impossible to achieve with a constructive modeler or deformer alone. We implement an intuitive custom deformation method in which a set of surface points serve as the design variables and user-specified constraints are intrinsically satisfied. We test our geometry platform on several design examples using an aerodynamic design framework based on Cartesian grids. We examine inverse airfoil design and shape matching and perform lift-constrained drag minimization on an airfoil with thickness constraints. A transport wing-fuselage integration problem demonstrates the approach in 3D. In a final example, our platform is pipelined with a constructive modeler to parabolically sweep a wingtip while applying a 1-G loading deformation across the wingspan. This work is an important first step towards the larger goal of leveraging the investment of the graphics industry to improve the state-of-the-art in aerospace geometry tools.

  11. Feasibility study of modern airships. Phase 2: Executive summary

    NASA Technical Reports Server (NTRS)

    1977-01-01

    A feasibility study of modern airships has been completed. Three promising modern airship systems' concepts and their associated missions were studied; (1) a heavy-lift airship, employing a non-rigid hull and a significant amount of rotor lift, used for short-range transport and positioning of heavy military and civil payloads, (2) a VTOL (vertical take-off and landing), metalclad, partially buoyant airship used as a short-haul commercial transport; and (3) a class of fully-buoyant airships used for long-endurance Navy missions. The heavy-lift airship concept offers a substantial increase in vertical lift capability over existing systems and is projected to have lower total operating costs per ton-mile. The VTOL airship transport concept appears to be economically competitive with other VTOL aircraft concepts but can attain significantly lower noise levels. The fully-buoyant airship concept can provide an airborne platform with long endurance that satisfies many Navy mission requirements.

  12. Application of lifting wavelet and random forest in compound fault diagnosis of gearbox

    NASA Astrophysics Data System (ADS)

    Chen, Tang; Cui, Yulian; Feng, Fuzhou; Wu, Chunzhi

    2018-03-01

    Aiming at the weakness of compound fault characteristic signals of a gearbox of an armored vehicle and difficult to identify fault types, a fault diagnosis method based on lifting wavelet and random forest is proposed. First of all, this method uses the lifting wavelet transform to decompose the original vibration signal in multi-layers, reconstructs the multi-layer low-frequency and high-frequency components obtained by the decomposition to get multiple component signals. Then the time-domain feature parameters are obtained for each component signal to form multiple feature vectors, which is input into the random forest pattern recognition classifier to determine the compound fault type. Finally, a variety of compound fault data of the gearbox fault analog test platform are verified, the results show that the recognition accuracy of the fault diagnosis method combined with the lifting wavelet and the random forest is up to 99.99%.

  13. An Evidence-Based Multidisciplinary Practice Guideline to Reduce the Workload due to Lifting for Preventing Work-Related Low Back Pain

    PubMed Central

    2014-01-01

    We developed an evidence-based practice guideline to support occupational safety and health (OSH) professionals in assessing the risk due to lifting and in selecting effective preventive measures for low back pain (LBP) in the Netherlands. The guideline was developed at the request of the Dutch government by a project team of experts and OSH professionals in lifting and work-related LBP. The recommendations for risk assessment were based on the quality of instruments to assess the risk on LBP due to lifting. Recommendations for interventions were based on a systematic review of the effects of worker- and work directed interventions to reduce back load due to lifting. The quality of the evidence was rated as strong (A), moderate (B), limited (C) or based on consensus (D). Finally, eight experts and twenty-four OSH professionals commented on and evaluated the content and the feasibility of the preliminary guideline. For risk assessment we recommend loads heavier than 25 kg always to be considered a risk for LBP while loads less than 3 kg do not pose a risk. For loads between 3–25 kg, risk assessment shall be performed using the Manual handling Assessment Charts (MAC)-Tool or National Institute for Occupational Safety and Health (NIOSH) lifting equation. Effective work oriented interventions are patient lifting devices (Level A) and lifting devices for goods (Level C), optimizing working height (Level A) and reducing load mass (Level C). Ineffective work oriented preventive measures are regulations to ban lifting without proper alternatives (Level D). We do not recommend worker-oriented interventions but consider personal lift assist devices as promising (Level C). Ineffective worker-oriented preventive measures are training in lifting technique (Level A), use of back-belts (Level A) and pre-employment medical examinations (Level A). This multidisciplinary evidence-based practice guideline gives clear criteria whether an employee is at risk for LBP while lifting and provides an easy-reference for (in)effective risk reduction measures based on scientific evidence, experience, and consensus among OSH experts and practitioners. PMID:24999432

  14. An Evidence-Based Multidisciplinary Practice Guideline to Reduce the Workload due to Lifting for Preventing Work-Related Low Back Pain.

    PubMed

    Kuijer, P Paul Fm; Verbeek, Jos Ham; Visser, Bart; Elders, Leo Am; Van Roden, Nico; Van den Wittenboer, Marion Er; Lebbink, Marian; Burdorf, Alex; Hulshof, Carel Tj

    2014-01-01

    We developed an evidence-based practice guideline to support occupational safety and health (OSH) professionals in assessing the risk due to lifting and in selecting effective preventive measures for low back pain (LBP) in the Netherlands. The guideline was developed at the request of the Dutch government by a project team of experts and OSH professionals in lifting and work-related LBP. The recommendations for risk assessment were based on the quality of instruments to assess the risk on LBP due to lifting. Recommendations for interventions were based on a systematic review of the effects of worker- and work directed interventions to reduce back load due to lifting. The quality of the evidence was rated as strong (A), moderate (B), limited (C) or based on consensus (D). Finally, eight experts and twenty-four OSH professionals commented on and evaluated the content and the feasibility of the preliminary guideline. For risk assessment we recommend loads heavier than 25 kg always to be considered a risk for LBP while loads less than 3 kg do not pose a risk. For loads between 3-25 kg, risk assessment shall be performed using the Manual handling Assessment Charts (MAC)-Tool or National Institute for Occupational Safety and Health (NIOSH) lifting equation. Effective work oriented interventions are patient lifting devices (Level A) and lifting devices for goods (Level C), optimizing working height (Level A) and reducing load mass (Level C). Ineffective work oriented preventive measures are regulations to ban lifting without proper alternatives (Level D). We do not recommend worker-oriented interventions but consider personal lift assist devices as promising (Level C). Ineffective worker-oriented preventive measures are training in lifting technique (Level A), use of back-belts (Level A) and pre-employment medical examinations (Level A). This multidisciplinary evidence-based practice guideline gives clear criteria whether an employee is at risk for LBP while lifting and provides an easy-reference for (in)effective risk reduction measures based on scientific evidence, experience, and consensus among OSH experts and practitioners.

  15. Software design to calculate and simulate the mechanical response of electromechanical lifts

    NASA Astrophysics Data System (ADS)

    Herrera, I.; Romero, E.

    2016-05-01

    Lift engineers and lift companies which are involved in the design process of new products or in the research and development of improved components demand a predictive tool of the lift slender system response before testing expensive prototypes. A method for solving the movement of any specified lift system by means of a computer program is presented. The mechanical response of the lift operating in a user defined installation and configuration, for a given excitation and other configuration parameters of real electric motors and its control system, is derived. A mechanical model with 6 degrees of freedom is used. The governing equations are integrated step by step through the Meden-Kutta algorithm in the MATLAB platform. Input data consists on the set point speed for a standard trip and the control parameters of a number of controllers and lift drive machines. The computer program computes and plots very accurately the vertical displacement, velocity, instantaneous acceleration and jerk time histories of the car, counterweight, frame, passengers/loads and lift drive in a standard trip between any two floors of the desired installation. The resulting torque, rope tension and deviation of the velocity plot with respect to the setpoint speed are shown. The software design is implemented in a demo release of the computer program called ElevaCAD. Further on, the program offers the possibility to select the configuration of the lift system and the performance parameters of each component. In addition to the overall system response, detailed information of transients, vibrations of the lift components, ride quality levels, modal analysis and frequency spectrum (FFT) are plotted.

  16. Workload assessment in building construction related activities in India.

    PubMed

    Maiti, Rina

    2008-11-01

    A field study was conducted to highlight the occupational risk factors related to building construction activities in India among female workers. These workers were engaged in eight different types of activities and related work parameters were studied in detail. From field environmental parameters, the calculated WBGT was obtained as 30.26+/-1.52 degrees C, indicated that these workers worked under a positive heat load condition. Whole day work study was conducted on 11 adult female workers performing concreting operation. They were having age of 28-32 years with 5-7 years of work experience. These workers were mainly performing two types of operations in the field: (A) asymmetric lifting during concreting a boundary wall formwork of a lift unit and (B) carrying the concrete mixture. During asymmetric lifting, the average field working heart rate (HR) was calculated as 124.1+/-12.5 beats min(-1), equivalent to 45.03+/-6.93% of VO(2) max level. These working heart rates (HRs) were significantly (p

  17. Mechanical lifting energy consumption in work activities designed by means of the “revised NIOSH lifting equation”

    PubMed Central

    RANAVOLO, Alberto; VARRECCHIA, Tiwana; RINALDI, Martina; SILVETTI, Alessio; SERRAO, Mariano; CONFORTO, Silvia; DRAICCHIO, Francesco

    2017-01-01

    The aims of the present work were: to calculate lifting energy consumption (LEC) in work activities designed to have a growing lifting index (LI) by means of revised NIOSH lifting equation; to evaluate the relationship between LEC and forces at the L5-S1 joint. The kinematic and kinetic data of 20 workers were recorded during the execution of lifting tasks in three conditions. We computed kinetic, potential and mechanical energy and the corresponding LEC by considering three different centers of mass of: 1) the load (CoML); 2) the multi-segment upper body model and load together (CoMUpp+L); 3) the whole body and load together (CoMTot). We also estimated compression and shear forces. Results shows that LEC calculated for CoMUpp+L and CoMTot grew significantly with the LI and that all the lifting condition pairs are discriminated. The correlation analysis highlighted a relationship between LEC and forces that determine injuries at the L5-S1 joint. PMID:28781290

  18. STS-56 Discovery, OV-103, lifts off from KSC LC Pad 39B into darkness

    NASA Technical Reports Server (NTRS)

    1993-01-01

    STS-56 Discovery, Orbiter Vehicle (OV) 103, lifts off from Kennedy Space Center (KSC) Launch Complex (LC) Pad 39B into the early morning darkness at 1:29 am (Eastern Daylight Time (EDT)). OV-103, atop its external tank (ET) and flanked by solid rocket boosters (SRBs), rises above the mobile launcher platform. Exhaust plumes trail from the SRBs. The glow of the SRB / space shuttle main engine (SSME) firings illuminate the fixed service structure (FSS) tower. Trees are silhouetted against the launch fireworks in the foreground.

  19. Continuous inertial microparticle and blood cell separation in straight channels with local microstructures.

    PubMed

    Wu, Zhenlong; Chen, Yu; Wang, Moran; Chung, Aram J

    2016-02-07

    Fluid inertia which has conventionally been neglected in microfluidics has been gaining much attention for particle and cell manipulation because inertia-based methods inherently provide simple, passive, precise and high-throughput characteristics. Particularly, the inertial approach has been applied to blood separation for various biomedical research studies mainly using spiral microchannels. For higher throughput, parallelization is essential; however, it is difficult to realize using spiral channels because of their large two dimensional layouts. In this work, we present a novel inertial platform for continuous sheathless particle and blood cell separation in straight microchannels containing microstructures. Microstructures within straight channels exert secondary flows to manipulate particle positions similar to Dean flow in curved channels but with higher controllability. Through a balance between inertial lift force and microstructure-induced secondary flow, we deterministically position microspheres and cells based on their sizes to be separated downstream. Using our inertial platform, we successfully sorted microparticles and fractionized blood cells with high separation efficiencies, high purities and high throughputs. The inertial separation platform developed here can be operated to process diluted blood with a throughput of 10.8 mL min(-1)via radially arrayed single channels with one inlet and two rings of outlets.

  20. KSC-2012-1356

    NASA Image and Video Library

    2012-02-15

    CAPE CANAVERAL, Fla. –– Just outside of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, an Apollo era diesel engine is secured onto the flatbed of a truck after it was removed from crawler-transporter 2 CT-2). New engines will be installed later this month. Work is in progress in high bay 2 to upgrade CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket, which is under design, and new Orion spacecraft to the launch pad. The crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Kim Shiflett

  1. KSC-2012-1341

    NASA Image and Video Library

    2012-02-15

    CAPE CANAVERAL, Fla. ––– Outside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, a crane is used to lower part of an Apollo era diesel engine from crawler-transporter 2 CT-2) onto the flatbed of a truck. New engines will be installed later this month. Work is in progress in high bay 2 to upgrade CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket, which is under design, and new Orion spacecraft to the launch pad. The crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Kim Shiflett

  2. KSC-2012-1342

    NASA Image and Video Library

    2012-02-15

    CAPE CANAVERAL, Fla. –– Outside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, a crane is used to lower part of an Apollo era diesel engine from crawler-transporter 2 CT-2) onto the flatbed of a truck. New engines will be installed later this month. Work is in progress in high bay 2 to upgrade CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket, which is under design, and new Orion spacecraft to the launch pad. The crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Kim Shiflett

  3. KSC-2012-1335

    NASA Image and Video Library

    2012-02-15

    CAPE CANAVERAL, Fla. –Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, a worker helps guide a crane as it is lowered toward crawler-transporter 2 CT-2) so that the Apollo era diesel engine can be removed. New engines will be installed later this month. Work is in progress in high bay 2 to upgrade CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket, which is under design, and new Orion spacecraft to the launch pad. The crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Kim Shiflett

  4. KSC-2012-1355

    NASA Image and Video Library

    2012-02-15

    CAPE CANAVERAL, Fla. –– Just outside of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, technicians help secure an Apollo era diesel engine onto the flatbed of a truck after it was removed from crawler-transporter 2 CT-2). New engines will be installed later this month. Work is in progress in high bay 2 to upgrade CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket, which is under design, and new Orion spacecraft to the launch pad. The crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Kim Shiflett

  5. Variable Lifting Index (VLI): A New Method for Evaluating Variable Lifting Tasks.

    PubMed

    Waters, Thomas; Occhipinti, Enrico; Colombini, Daniela; Alvarez-Casado, Enrique; Fox, Robert

    2016-08-01

    We seek to develop a new approach for analyzing the physical demands of highly variable lifting tasks through an adaptation of the Revised NIOSH (National Institute for Occupational Safety and Health) Lifting Equation (RNLE) into a Variable Lifting Index (VLI). There are many jobs that contain individual lifts that vary from lift to lift due to the task requirements. The NIOSH Lifting Equation is not suitable in its present form to analyze variable lifting tasks. In extending the prior work on the VLI, two procedures are presented to allow users to analyze variable lifting tasks. One approach involves the sampling of lifting tasks performed by a worker over a shift and the calculation of the Frequency Independent Lift Index (FILI) for each sampled lift and the aggregation of the FILI values into six categories. The Composite Lift Index (CLI) equation is used with lifting index (LI) category frequency data to calculate the VLI. The second approach employs a detailed systematic collection of lifting task data from production and/or organizational sources. The data are organized into simplified task parameter categories and further aggregated into six FILI categories, which also use the CLI equation to calculate the VLI. The two procedures will allow practitioners to systematically employ the VLI method to a variety of work situations where highly variable lifting tasks are performed. The scientific basis for the VLI procedure is similar to that for the CLI originally presented by NIOSH; however, the VLI method remains to be validated. The VLI method allows an analyst to assess highly variable manual lifting jobs in which the task characteristics vary from lift to lift during a shift. © 2015, Human Factors and Ergonomics Society.

  6. Pregnancy and work

    MedlinePlus

    ... may need to stop working or reduce your work hours. Most women are advised to only lift things that weigh under 20 pounds (9 kilograms) during pregnancy. Repetitively lifting heavier amounts often causes back injury or disability.

  7. Estimated energy expenditure of nursing assistants in long term care.

    PubMed

    Olson, Darcie L; King, Phyllis M

    2012-01-01

    Ergonomic research on nursing work has focused primarily on the biomechanical analysis of patient handling tasks. Few studies have addressed the intensity of a full day of nursing work as measured by changes in heart rate and energy expenditure. A pilot study was conducted between August 2009 and May 2010 to examine the intensity of performing nursing assistant work in long term care settings and to assess the usefulness of heart rate monitoring as a measure of work intensity. The residents of the facilities were physically dependent adults. The settings had floor-based mechanical lifting devices available and no-lift policies that restricted workers from lifting. Eight women between the ages of 19 and 54 from two facilities participated in this study. A wearable recorder allowed unobtrusive heart rate monitoring while nursing assistants worked their usual shift. Continuous heart rate monitoring for a full shift provided an estimation of energy expenditure. The data suggest that the nursing assistants worked at a moderate level yet were within the safe work intensity level recommended by NIOSH [32]. The information provides preliminary baseline data for nursing assistants who work with physically dependent adults using floor-based lifts in a no-lift environment.

  8. Variable Lifting Index (VLI)

    PubMed Central

    Waters, Thomas; Occhipinti, Enrico; Colombini, Daniela; Alvarez-Casado, Enrique; Fox, Robert

    2015-01-01

    Objective: We seek to develop a new approach for analyzing the physical demands of highly variable lifting tasks through an adaptation of the Revised NIOSH (National Institute for Occupational Safety and Health) Lifting Equation (RNLE) into a Variable Lifting Index (VLI). Background: There are many jobs that contain individual lifts that vary from lift to lift due to the task requirements. The NIOSH Lifting Equation is not suitable in its present form to analyze variable lifting tasks. Method: In extending the prior work on the VLI, two procedures are presented to allow users to analyze variable lifting tasks. One approach involves the sampling of lifting tasks performed by a worker over a shift and the calculation of the Frequency Independent Lift Index (FILI) for each sampled lift and the aggregation of the FILI values into six categories. The Composite Lift Index (CLI) equation is used with lifting index (LI) category frequency data to calculate the VLI. The second approach employs a detailed systematic collection of lifting task data from production and/or organizational sources. The data are organized into simplified task parameter categories and further aggregated into six FILI categories, which also use the CLI equation to calculate the VLI. Results: The two procedures will allow practitioners to systematically employ the VLI method to a variety of work situations where highly variable lifting tasks are performed. Conclusions: The scientific basis for the VLI procedure is similar to that for the CLI originally presented by NIOSH; however, the VLI method remains to be validated. Application: The VLI method allows an analyst to assess highly variable manual lifting jobs in which the task characteristics vary from lift to lift during a shift. PMID:26646300

  9. JWST ISIM test platform

    NASA Image and Video Library

    2010-03-17

    A view inside the NASA Goddard clean room where the James Webb Space Telescope (JWST) is being built. This images shows Goddard technicians lifting the ISIM (Integrated Science Instrument Module) onto the ITS (ISIM Test Structure). ISIM will sit atop this platform during space environmental testing. Credit: NASA/GSFC/Chris Gunn For more information on JWST go to: www.jwst.nasa.gov/ For more information on Goddard Space Flight Center go to: www.nasa.gov/centers/goddard/home/index.html

  10. A VLSI Implementation of Four-Phase Lift Controller Using Verilog HDL

    NASA Astrophysics Data System (ADS)

    Kumar, Manish; Singh, Priyanka; Singh, Shesha

    2017-08-01

    With the advent of an era of staggering range of new technologies to provide ease of mobility and transportation elevators have become an essential component of all high rise buildings. An elevator is a type of vertical transportation that moves people between the floors of a high rise building. A four-Phase lift controller modeled on Verilog HDL code using Finite State Machine (FSM) has been presented in this paper. Verilog HDL helps in automated analysis and simulation of lift controller circuit. This design is based on synchronous input that operates on a fixed frequency. The Lift motion is controlled by means of accepting the destination floor level as input and generate control signal as output. In the proposed design a Verilog RTL code is developed and verified. Project Navigator of XILINX has been used as a code writing platform and results were simulated using Modelsim 5.4a simulator. This paper discusses the overall evolution of design and also discusses simulated results.

  11. Mechanical lifting energy consumption in work activities designed by means of the "revised NIOSH lifting equation".

    PubMed

    Ranavolo, Alberto; Varrecchia, Tiwana; Rinaldi, Martina; Silvetti, Alessio; Serrao, Mariano; Conforto, Silvia; Draicchio, Francesco

    2017-10-07

    The aims of the present work were: to calculate lifting energy consumption (LEC) in work activities designed to have a growing lifting index (LI) by means of revised NIOSH lifting equation; to evaluate the relationship between LEC and forces at the L 5 -S 1 joint. The kinematic and kinetic data of 20 workers were recorded during the execution of lifting tasks in three conditions. We computed kinetic, potential and mechanical energy and the corresponding LEC by considering three different centers of mass of: 1) the load (CoM L ); 2) the multi-segment upper body model and load together (CoM Upp+L ); 3) the whole body and load together (CoM Tot ). We also estimated compression and shear forces. Results shows that LEC calculated for CoM Upp+L and CoM Tot grew significantly with the LI and that all the lifting condition pairs are discriminated. The correlation analysis highlighted a relationship between LEC and forces that determine injuries at the L 5 -S 1 joint.

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Halsted, Michelle; Wilmoth, Jared L.; Briggs, Paige A.

    Microbial communities are incredibly complex systems that dramatically and ubiquitously influence our lives. They help to shape our climate and environment, impact agriculture, drive business, and have a tremendous bearing on healthcare and physical security. Spatial confinement, as well as local variations in physical and chemical properties, affects development and interactions within microbial communities that occupy critical niches in the environment. Recent work has demonstrated the use of silicon based microwell arrays, combined with parylene lift-off techniques, to perform both deterministic and stochastic assembly of microbial communities en masse, enabling the high-throughput screening of microbial communities for their response tomore » growth in confined environments under different conditions. The implementation of a transparent microwell array platform can expand and improve the imaging modalities that can be used to characterize these assembled communities. In this paper, the fabrication and characterization of a next generation transparent microwell array is described. The transparent arrays, comprised of SU-8 patterned on a glass coverslip, retain the ability to use parylene lift-off by integrating a low temperature atomic layer deposition of silicon dioxide into the fabrication process. This silicon dioxide layer prevents adhesion of the parylene material to the patterned SU-8, facilitating dry lift-off, and maintaining the ability to easily assemble microbial communities within the microwells. These transparent microwell arrays can screen numerous community compositions using continuous, high resolution, imaging. Finally, the utility of the design was successfully demonstrated through the stochastic seeding and imaging of green fluorescent protein expressing Escherichia coli using both fluorescence and brightfield microscopies.« less

  13. STS-45 Atlantis, OV-104, lifts off from KSC Launch Complex (LC) Pad

    NASA Image and Video Library

    1992-03-24

    STS-45 Atlantis, Orbiter Vehicle (OV) 104, lifts off from a Kennedy Space Center (KSC) Launch Complex (LC) Pad at 8:13:40:048 am (Eastern Standard Time (EST)). Exhaust billows out the solid rocket boosters (SRBs) as OV-104 atop its external tank (ET) soars above the mobile launcher platform and is nearly clear of the fixed service structure (FSS) tower. The diamond shock effect produced by the space shuttle main engines (SSMEs) is visible. The glow of the SRB/SSME firings is reflected in a nearby waterway. An exhaust cloud covers the launch pad area.

  14. InGaP/GaAs Inverted Dual Junction Solar Cells For CPV Applications Using Metal-Backed Epitaxial Lift-Off

    NASA Astrophysics Data System (ADS)

    Bauhuis, Gerard J.; Mulder, Peter; Haverkamp, Erik J.; Schermer, John J.; Nash, Lee J.; Fulgoni, Dominic J. F.; Ballard, Ian M.; Duggan, Geoffrey

    2010-10-01

    The epitaxial lift-off (ELO) technique has been combined with inverted III-V PV cell epitaxial growth with the aim of employing thin film PV cells in HCPV systems. In a stepwise approach to the realization of an inverted triple junction on a MELO platform we have first grown a GaAs single junction PV cell to establish the basic layer release process and cell processing steps followed by the growth, fabrication and test of an inverted InGaP/GaAs dual junction structure.

  15. Vertical Lift - Not Just For Terrestrial Flight

    NASA Technical Reports Server (NTRS)

    Young, Larry A

    2000-01-01

    Autonomous vertical lift vehicles hold considerable potential for supporting planetary science and exploration missions. This paper discusses several technical aspects of vertical lift planetary aerial vehicles in general, and specifically addresses technical challenges and work to date examining notional vertical lift vehicles for Mars, Titan, and Venus exploration.

  16. Normalized lift: an energy interpretation of the lift coefficient simplifies comparisons of the lifting ability of rotating and flapping surfaces.

    PubMed

    Burgers, Phillip; Alexander, David E

    2012-01-01

    For a century, researchers have used the standard lift coefficient C(L) to evaluate the lift, L, generated by fixed wings over an area S against dynamic pressure, ½ρv(2), where v is the effective velocity of the wing. Because the lift coefficient was developed initially for fixed wings in steady flow, its application to other lifting systems requires either simplifying assumptions or complex adjustments as is the case for flapping wings and rotating cylinders.This paper interprets the standard lift coefficient of a fixed wing slightly differently, as the work exerted by the wing on the surrounding flow field (L/ρ·S), compared against the total kinetic energy required for generating said lift, ½v(2). This reinterpreted coefficient, the normalized lift, is derived from the work-energy theorem and compares the lifting capabilities of dissimilar lift systems on a similar energy footing. The normalized lift is the same as the standard lift coefficient for fixed wings, but differs for wings with more complex motions; it also accounts for such complex motions explicitly and without complex modifications or adjustments. We compare the normalized lift with the previously-reported values of lift coefficient for a rotating cylinder in Magnus effect, a bat during hovering and forward flight, and a hovering dipteran.The maximum standard lift coefficient for a fixed wing without flaps in steady flow is around 1.5, yet for a rotating cylinder it may exceed 9.0, a value that implies that a rotating cylinder generates nearly 6 times the maximum lift of a wing. The maximum normalized lift for a rotating cylinder is 1.5. We suggest that the normalized lift can be used to evaluate propellers, rotors, flapping wings of animals and micro air vehicles, and underwater thrust-generating fins in the same way the lift coefficient is currently used to evaluate fixed wings.

  17. Normalized Lift: An Energy Interpretation of the Lift Coefficient Simplifies Comparisons of the Lifting Ability of Rotating and Flapping Surfaces

    PubMed Central

    Burgers, Phillip; Alexander, David E.

    2012-01-01

    For a century, researchers have used the standard lift coefficient CL to evaluate the lift, L, generated by fixed wings over an area S against dynamic pressure, ½ρv 2, where v is the effective velocity of the wing. Because the lift coefficient was developed initially for fixed wings in steady flow, its application to other lifting systems requires either simplifying assumptions or complex adjustments as is the case for flapping wings and rotating cylinders. This paper interprets the standard lift coefficient of a fixed wing slightly differently, as the work exerted by the wing on the surrounding flow field (L/ρ·S), compared against the total kinetic energy required for generating said lift, ½v2. This reinterpreted coefficient, the normalized lift, is derived from the work-energy theorem and compares the lifting capabilities of dissimilar lift systems on a similar energy footing. The normalized lift is the same as the standard lift coefficient for fixed wings, but differs for wings with more complex motions; it also accounts for such complex motions explicitly and without complex modifications or adjustments. We compare the normalized lift with the previously-reported values of lift coefficient for a rotating cylinder in Magnus effect, a bat during hovering and forward flight, and a hovering dipteran. The maximum standard lift coefficient for a fixed wing without flaps in steady flow is around 1.5, yet for a rotating cylinder it may exceed 9.0, a value that implies that a rotating cylinder generates nearly 6 times the maximum lift of a wing. The maximum normalized lift for a rotating cylinder is 1.5. We suggest that the normalized lift can be used to evaluate propellers, rotors, flapping wings of animals and micro air vehicles, and underwater thrust-generating fins in the same way the lift coefficient is currently used to evaluate fixed wings. PMID:22629326

  18. Back muscle strength, lifting, and stooped working postures.

    PubMed

    Poulsen, E; Jørgensen, K

    1971-09-01

    When lifting loads and working in a forward stooped position, the muscles of the back rather than the ligaments and bony structures of the spine should overcome the gravitational forces. Formulae, based on measurements of back muscle strength, for prediction of maximal loads to be lifted, and for the ability to sustain work in a stooped position, have been worked out and tested in practical situations. From tests with 50 male and female subjects the simplest prediction formulae for maximum loads were: max. load = 1.10 x isometric back muscle strength for men; and max. load = 0.95 x isometric back muscle strength - 8 kg for women. Some standard values for maximum lifts and permissible single and repeated lifts have been calculated for men and women separately and are given in Table 1. From tests with 65 rehabilitees it was found that the maximum isometric strength of the back muscles measured at shoulder height should exceed 2/3 of the body weight, if fatigue and/or pain in the back muscles is to be avoided during work in a standing stooped position.

  19. 29 CFR 1910.178 - Powered industrial trucks.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., design, maintenance, and use of fork trucks, tractors, platform lift trucks, motorized hand trucks, and... new powered industrial trucks acquired and used by an employer shall meet the design and construction... that the electrical fittings and equipment are so designed, constructed and assembled that the units...

  20. 29 CFR 1910.178 - Powered industrial trucks.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., design, maintenance, and use of fork trucks, tractors, platform lift trucks, motorized hand trucks, and... new powered industrial trucks acquired and used by an employer shall meet the design and construction... that the electrical fittings and equipment are so designed, constructed and assembled that the units...

  1. 29 CFR 1910.178 - Powered industrial trucks.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., design, maintenance, and use of fork trucks, tractors, platform lift trucks, motorized hand trucks, and... new powered industrial trucks acquired and used by an employer shall meet the design and construction... that the electrical fittings and equipment are so designed, constructed and assembled that the units...

  2. 29 CFR 1910.178 - Powered industrial trucks.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., design, maintenance, and use of fork trucks, tractors, platform lift trucks, motorized hand trucks, and... new powered industrial trucks acquired and used by an employer shall meet the design and construction... that the electrical fittings and equipment are so designed, constructed and assembled that the units...

  3. 29 CFR 1910.178 - Powered industrial trucks.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., design, maintenance, and use of fork trucks, tractors, platform lift trucks, motorized hand trucks, and... new powered industrial trucks acquired and used by an employer shall meet the design and construction... that the electrical fittings and equipment are so designed, constructed and assembled that the units...

  4. Innovative workover/drilling rigs to utilize hydraulics

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Noran, D.

    1975-09-29

    While Western Gear Corp., Everett, Wash., is currently building 2 models of a hydraulic workover/drilling rig (one offshore and the other a trailer-mounted land rig), Bender Co., Bakersfield, Calif., already has an all-hydraulic servicing/drilling rig undergoing tests. The rigs are similar in that they eliminate the traveling block, crown block, draw works, chains, and sprockets found on the conventional rig. The major design innovation on the Western Gear model is the 260,000-lb-capacity hoisting system in which 2 hydraulic rams are anchored to the rig floor and carry all the pipe weight, thus eliminating the danger of the derrick's being pulledmore » in. Other changes involve the tripping system, a power swivel/elevator, and the control valves. Maintenance and labor cost reductions are expected to be substantial. The Bender Co. rig has a single-section mast that is a lever-lift-type derrick which serves as a guide for the rams and a support for the pipe-racking platform. Hoisting capacity depends on the number and size of the lifting rods (which support the crown sheaves) and the hydraulic pressure applied. Manufacturing and operating costs are expected to be less than for conventional rigs.« less

  5. KSC-98pc1131

    NASA Image and Video Library

    1998-09-18

    KENNEDY SPACE CENTER, FLA. -- The Spartan solar-observing deployable spacecraft is lifted from its work stand to move it to a payload canister in the Multi-Payload Processing Facility at KSC. Spartan is one of the payloads for the STS-95 mission, scheduled to launch Oct. 29. Spartan is a solar physics spacecraft designed to perform remote sensing of the hot outer layers of the sun's atmosphere or corona. The objective of the observations is to investigate the mechanisms causing the heating of the solar corona and the acceleration of the solar wind which originates in the corona. Other research payloads include the Hubble Space Telescope Orbital Systems Test Platform, the International Extreme Ultraviolet Hitchhiker, and the SPACEHAB single module with experiments on space flight and the aging process

  6. KSC-2012-1354

    NASA Image and Video Library

    2012-02-15

    CAPE CANAVERAL, Fla. –– Just outside of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, technicians assist as a crane is used to lower an Apollo era diesel engine onto the flatbed of a truck after it was removed from crawler-transporter 2 CT-2). New engines will be installed later this month. Work is in progress in high bay 2 to upgrade CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket, which is under design, and new Orion spacecraft to the launch pad. The crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Kim Shiflett

  7. KSC-2012-1353

    NASA Image and Video Library

    2012-02-15

    CAPE CANAVERAL, Fla. –– Just outside of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, technicians assist as a crane is used to lower an Apollo era diesel engine onto the flatbed of a truck after it was removed from crawler-transporter 2 CT-2). New engines will be installed later this month. Work is in progress in high bay 2 to upgrade CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket, which is under design, and new Orion spacecraft to the launch pad. The crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Kim Shiflett

  8. 46 CFR 163.002-13 - Construction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... sharp edges and projections of excessive length. A pilot hoist must not have nonfunctional sharp edges... vessel's side rails for support; and (3) Unobstructed passage between the ladder or lift platform of the... between the vessel's compressed air source and the pneumatic motor. (l) Hoist control lever. Each pilot...

  9. 46 CFR 163.002-13 - Construction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... sharp edges and projections of excessive length. A pilot hoist must not have nonfunctional sharp edges... vessel's side rails for support; and (3) Unobstructed passage between the ladder or lift platform of the... between the vessel's compressed air source and the pneumatic motor. (l) Hoist control lever. Each pilot...

  10. 46 CFR 163.002-13 - Construction.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... sharp edges and projections of excessive length. A pilot hoist must not have nonfunctional sharp edges... vessel's side rails for support; and (3) Unobstructed passage between the ladder or lift platform of the... between the vessel's compressed air source and the pneumatic motor. (l) Hoist control lever. Each pilot...

  11. The NIST SPIDER, A Robot Crane

    PubMed Central

    Albus, James; Bostelman, Roger; Dagalakis, Nicholas

    1992-01-01

    The Robot Systems Division of the National Institute of Standards and Technology has been experimenting for several years with new concepts for robot cranes. These concepts utilize the basic idea of the Stewart Platform parallel link manipulator. The unique feature of the NIST approach is to use cables as the parallel links and to use winches as the actuators. So long as the cables are all in tension, the load is kinematically constrained, and the cables resist perturbing forces and moments with equal stiffness to both positive and negative loads. The result is that the suspended load is constrained with a mechanical stiffness determined by the elasticity of the cables, the suspended weight, and the geometry of the mechanism. Based on these concepts, a revolutionary new type of robot crane, the NIST SPIDER (Stewart Platform Instrumented Drive Environmental Robot) has been developed that can control the position, velocity, and force of tools and heavy machinery in all six degrees of freedom (x, y, z, roll, pitch, and yaw). Depending on what is suspended from its work platform, the SPIDER can perform a variety of tasks. Examples are: cutting, excavating and grading, shaping and finishing, lifting and positioning. A 6 m version of the SPIDER has been built and critical performance characteristics analyzed. PMID:28053439

  12. The NIST SPIDER, A Robot Crane.

    PubMed

    Albus, James; Bostelman, Roger; Dagalakis, Nicholas

    1992-01-01

    The Robot Systems Division of the National Institute of Standards and Technology has been experimenting for several years with new concepts for robot cranes. These concepts utilize the basic idea of the Stewart Platform parallel link manipulator. The unique feature of the NIST approach is to use cables as the parallel links and to use winches as the actuators. So long as the cables are all in tension, the load is kinematically constrained, and the cables resist perturbing forces and moments with equal stiffness to both positive and negative loads. The result is that the suspended load is constrained with a mechanical stiffness determined by the elasticity of the cables, the suspended weight, and the geometry of the mechanism. Based on these concepts, a revolutionary new type of robot crane, the NIST SPIDER (Stewart Platform Instrumented Drive Environmental Robot) has been developed that can control the position, velocity, and force of tools and heavy machinery in all six degrees of freedom ( x, y, z , roll, pitch, and yaw). Depending on what is suspended from its work platform, the SPIDER can perform a variety of tasks. Examples are: cutting, excavating and grading, shaping and finishing, lifting and positioning. A 6 m version of the SPIDER has been built and critical performance characteristics analyzed.

  13. Semi-Supervised Learning of Lift Optimization of Multi-Element Three-Segment Variable Camber Airfoil

    NASA Technical Reports Server (NTRS)

    Kaul, Upender K.; Nguyen, Nhan T.

    2017-01-01

    This chapter describes a new intelligent platform for learning optimal designs of morphing wings based on Variable Camber Continuous Trailing Edge Flaps (VCCTEF) in conjunction with a leading edge flap called the Variable Camber Krueger (VCK). The new platform consists of a Computational Fluid Dynamics (CFD) methodology coupled with a semi-supervised learning methodology. The CFD component of the intelligent platform comprises of a full Navier-Stokes solution capability (NASA OVERFLOW solver with Spalart-Allmaras turbulence model) that computes flow over a tri-element inboard NASA Generic Transport Model (GTM) wing section. Various VCCTEF/VCK settings and configurations were considered to explore optimal design for high-lift flight during take-off and landing. To determine globally optimal design of such a system, an extremely large set of CFD simulations is needed. This is not feasible to achieve in practice. To alleviate this problem, a recourse was taken to a semi-supervised learning (SSL) methodology, which is based on manifold regularization techniques. A reasonable space of CFD solutions was populated and then the SSL methodology was used to fit this manifold in its entirety, including the gaps in the manifold where there were no CFD solutions available. The SSL methodology in conjunction with an elastodynamic solver (FiDDLE) was demonstrated in an earlier study involving structural health monitoring. These CFD-SSL methodologies define the new intelligent platform that forms the basis for our search for optimal design of wings. Although the present platform can be used in various other design and operational problems in engineering, this chapter focuses on the high-lift study of the VCK-VCCTEF system. Top few candidate design configurations were identified by solving the CFD problem in a small subset of the design space. The SSL component was trained on the design space, and was then used in a predictive mode to populate a selected set of test points outside of the given design space. The new design test space thus populated was evaluated by using the CFD component by determining the error between the SSL predictions and the true (CFD) solutions, which was found to be small. This demonstrates the proposed CFD-SSL methodologies for isolating the best design of the VCK-VCCTEF system, and it holds promise for quantitatively identifying best designs of flight systems, in general.

  14. Lift calculations based on accepted wake models for animal flight are inconsistent and sensitive to vortex dynamics.

    PubMed

    Gutierrez, Eric; Quinn, Daniel B; Chin, Diana D; Lentink, David

    2016-12-06

    There are three common methods for calculating the lift generated by a flying animal based on the measured airflow in the wake. However, these methods might not be accurate according to computational and robot-based studies of flapping wings. Here we test this hypothesis for the first time for a slowly flying Pacific parrotlet in still air using stereo particle image velocimetry recorded at 1000 Hz. The bird was trained to fly between two perches through a laser sheet wearing laser safety goggles. We found that the wingtip vortices generated during mid-downstroke advected down and broke up quickly, contradicting the frozen turbulence hypothesis typically assumed in animal flight experiments. The quasi-steady lift at mid-downstroke was estimated based on the velocity field by applying the widely used Kutta-Joukowski theorem, vortex ring model, and actuator disk model. The calculated lift was found to be sensitive to the applied model and its different parameters, including vortex span and distance between the bird and laser sheet-rendering these three accepted ways of calculating weight support inconsistent. The three models predict different aerodynamic force values mid-downstroke compared to independent direct measurements with an aerodynamic force platform that we had available for the same species flying over a similar distance. Whereas the lift predictions of the Kutta-Joukowski theorem and the vortex ring model stayed relatively constant despite vortex breakdown, their values were too low. In contrast, the actuator disk model predicted lift reasonably accurately before vortex breakdown, but predicted almost no lift during and after vortex breakdown. Some of these limitations might be better understood, and partially reconciled, if future animal flight studies report lift calculations based on all three quasi-steady lift models instead. This would also enable much needed meta studies of animal flight to derive bioinspired design principles for quasi-steady lift generation with flapping wings.

  15. Kinematics and Kinetics of Squat and Deadlift Exercises with Varying Stance Widths

    NASA Technical Reports Server (NTRS)

    DeWitt, John K.; Fincke, Renita S.; Logan, Rachel L.

    2011-01-01

    The primary motion of squat and deadlift exercise involves flexion and extension of the hips, knees, and ankles, but each exercise can be performed with variations in stance width. These variations may result in differing kinematics and ground reaction forces (GRF), which may in turn affect joint loading. PURPOSE: The purpose of this investigation was to compare ankle, knee, and hip kinematics and kinetics of normal squat (NS), wide-stance squat (WS), normal deadlift (ND), and sumo deadlift (SD). We hypothesized that hip joint kinematics and work at each joint would differ between exercise variations. METHODS: Six subjects (3 m/3 f; 70.0 plus or minus 13.7 kg; 168 plus or minus 9.9 cm) performed each lift in normal gravity on the ground-based version of the Advanced Resistive Exercise Device (ARED) used on the International Space Station. The ARED provided resistance with a combination vacuum tube/flywheel mechanism designed to replicate the gravitational and inertial forces of free weights. Subjects completed each lift with their 10-repetition maximum load. Kinematic data were collected at 250 Hz by a 12-camera motion-capture system (Smart-D, BTS Bioengineering, Milan, Italy), and GRF data were collected at 1000 Hz with independent force platforms for each leg (Model 9261, Kistler Instruments AG, Winterhur, Switzerland). All data were captured simultaneously on a single workstation. The right leg of a single lift for each motion was analyzed. Modeling software (OpenSim 2.2.0, Simbios, Palo Alto, CA) determined joint kinematics and net positive and negative work at each lower extremity joint. Total work was found as the sum of work across all joints and was normalized by system mass. Effect sizes and their 95% confidence intervals were computed between conditions. RESULTS: Peak GRF were similar for each lift. There were no differences between conditions in hip flexion range of motion (ROM). For hip adduction ROM, there were no differences between the NS, WS, and SD. However, hip adduction ROM was greater during the NS and SD than during the ND. Hip rotation ROM was greater during the WS than during the NS and SD, and was greater during the SD than during the ND. For knee and ankle flexion ROM, the ND, WS, and SD were not different, but ROM was greater during the NS than the ND and greater during the WS than the SD. Total eccentric work was greater during the WS than the SD. Otherwise, there were no differences in eccentric or concentric work between conditions. CONCLUSIONS: Although squat and deadlift exercises consist of similar motions, there are kinematic differences between them that depend on stance width. Total eccentric and concentric work are similar for different lifts, but differing kinematics may require activation of different musculature for each variation. With respect to each condition, in the ND the ROM of each joint tended to be less, and the WS tended to trade knee motion for hip motion. PRACTICAL APPLICATIONS: Knowledge of differences in kinematics and kinetics between different squat and deadlift variations is important for coaches and rehabilitation personnel to understand when prescribing exercise. Our results suggest that each variation of the squat and deadlift should be considered a separate exercise that may induce different long-term training effects.

  16. 49 CFR 38.159 - Mobility aid accessibility.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... with the inner barrier (if applicable) down or retracted, gaps between the forward lift platform edge... inches (1220 mm). Such space shall adjoin, and may overlap, an access path. Not more than 6 inches (150 mm) of the required clear floor space may be accommodated for footrests under another seat, modesty...

  17. 49 CFR 38.159 - Mobility aid accessibility.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... with the inner barrier (if applicable) down or retracted, gaps between the forward lift platform edge... inches (1220 mm). Such space shall adjoin, and may overlap, an access path. Not more than 6 inches (150 mm) of the required clear floor space may be accommodated for footrests under another seat, modesty...

  18. 49 CFR 571.403 - Standard No. 403; Platform lift systems for motor vehicles.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... in S7.1.1, may not fall vertically faster than 305 mm (12 in) per second or change angular... that has been calibrated to an accuracy of ±2 percent of the reading in the range of 25N to 100N. S7.2...

  19. 49 CFR 571.403 - Standard No. 403; Platform lift systems for motor vehicles.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... in S7.1.1, may not fall vertically faster than 305 mm (12 in) per second or change angular... that has been calibrated to an accuracy of ±2 percent of the reading in the range of 25N to 100N. S7.2...

  20. 49 CFR 38.73 - Doorways.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... inches and the height of the vehicle floor shall be within plus or minus 5/8 inch of the platform height. Vertical alignment may be accomplished by vehicle air suspension, automatic ramps or lifts, or any combination. (2) Exception. New vehicles operating in existing stations may have a floor height within plus or...

  1. 49 CFR 38.73 - Doorways.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... inches and the height of the vehicle floor shall be within plus or minus 5/8 inch of the platform height. Vertical alignment may be accomplished by vehicle air suspension, automatic ramps or lifts, or any combination. (2) Exception. New vehicles operating in existing stations may have a floor height within plus or...

  2. 49 CFR 38.73 - Doorways.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... inches and the height of the vehicle floor shall be within plus or minus 5/8 inch of the platform height. Vertical alignment may be accomplished by vehicle air suspension, automatic ramps or lifts, or any combination. (2) Exception. New vehicles operating in existing stations may have a floor height within plus or...

  3. 49 CFR 38.73 - Doorways.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... inches and the height of the vehicle floor shall be within plus or minus 5/8 inch of the platform height. Vertical alignment may be accomplished by vehicle air suspension, automatic ramps or lifts, or any combination. (2) Exception. New vehicles operating in existing stations may have a floor height within plus or...

  4. Evaluation of hot mix asphalt (HMA) lift thickness.

    DOT National Transportation Integrated Search

    2009-10-01

    The range of lift thicknesses allowed by the Mississippi Department of Transportation has worked well for many years. However, because of the current availability of gravels of sufficient size to crush, modification to the allowed lift thicknesses am...

  5. 77 FR 25889 - Drawbridge Operation Regulations; Niantic River, Niantic, CT

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-02

    ... 20 nights to facilitate completion of work on machinery and the lift span. DATES: This deviation is... completion of machinery installation and lift span work at the new Niantic River RR Bridge. To facilitate...

  6. KSC-98pc1180

    NASA Image and Video Library

    1998-09-28

    KENNEDY SPACE CENTER, FLA. -- At left, the payload canister for Space Shuttle Discovery is lifted from its canister movement vehicle to the top of the Rotating Service Structure on Launch Pad 39-B. Discovery (right), sitting atop the Mobile Launch Platform and next to the Fixed Service Structure, is scheduled for launch on Oct. 29, 1998, for the STS-95 mission. That mission includes the International Extreme Ultraviolet Hitchhiker (IEH-3), the Hubble Space Telescope Orbital Systems Test Platform, the Spartan solar-observing deployable spacecraft, and the SPACEHAB single module with experiments on space flight and the aging process

  7. Development of transparent microwell arrays for optical monitoring and dissection of microbial communities

    DOE PAGES

    Halsted, Michelle; Wilmoth, Jared L.; Briggs, Paige A.; ...

    2016-09-29

    Microbial communities are incredibly complex systems that dramatically and ubiquitously influence our lives. They help to shape our climate and environment, impact agriculture, drive business, and have a tremendous bearing on healthcare and physical security. Spatial confinement, as well as local variations in physical and chemical properties, affects development and interactions within microbial communities that occupy critical niches in the environment. Recent work has demonstrated the use of silicon based microwell arrays, combined with parylene lift-off techniques, to perform both deterministic and stochastic assembly of microbial communities en masse, enabling the high-throughput screening of microbial communities for their response tomore » growth in confined environments under different conditions. The implementation of a transparent microwell array platform can expand and improve the imaging modalities that can be used to characterize these assembled communities. In this paper, the fabrication and characterization of a next generation transparent microwell array is described. The transparent arrays, comprised of SU-8 patterned on a glass coverslip, retain the ability to use parylene lift-off by integrating a low temperature atomic layer deposition of silicon dioxide into the fabrication process. This silicon dioxide layer prevents adhesion of the parylene material to the patterned SU-8, facilitating dry lift-off, and maintaining the ability to easily assemble microbial communities within the microwells. These transparent microwell arrays can screen numerous community compositions using continuous, high resolution, imaging. Finally, the utility of the design was successfully demonstrated through the stochastic seeding and imaging of green fluorescent protein expressing Escherichia coli using both fluorescence and brightfield microscopies.« less

  8. Investigation of Body-involved Lift Enhancement in Bio-inspired Flapping Flight

    NASA Astrophysics Data System (ADS)

    Wang, Junshi; Liu, Geng; Ren, Yan; Dong, Haibo

    2016-11-01

    Previous studies found that insects and birds are capable of using many unsteady aerodynamic mechanisms to augment the lift production. These include leading edge vortices, delayed stall, wake capture, clap-and-fling, etc. Yet the body-involved lift augmentation has not been paid enough attention. In this work, the aerodynamic effects of the wing-body interaction on the lift production in cicada and hummingbird forward flight are computationally investigated. 3D wing-body systems and wing flapping kinematics are reconstructed from the high-speed videos or literatures to keep their complexity. Vortex structures and associated aerodynamic performance are numerically studied by an in-house immersed-boundary-method-based flow solver. The results show that the wing-body interaction enhances the overall lift production by about 20% in the cicada flight and about 28% in the hummingbird flight, respectively. Further investigation on the vortex dynamics has shown that this enhancement is attributed to the interactions between the body-generated vortices and the flapping wings. The output from this work has revealed a new lift enhancement mechanism in the flapping flight. This work is supported by NSF CBET-1313217 and AFOSR FA9550-12-1-0071.

  9. KSC-2014-3194

    NASA Image and Video Library

    2014-07-21

    CAPE CANAVERAL, Fla. -- At the Kennedy Space Center in Florida, work is underway to transform the center into a multi-user spaceport. Launch Pad 39B, in the foreground, is being modified to support the agency's new Orion spacecraft which will lift off atop the Space Launch System rocket. Orion is designed to take humans farther than they’ve ever gone before, serving as the exploration vehicle that will carry astronauts to deep space and sustain the crew during travel to destinations such as an asteroid or Mars. On April 14, NASA signed a property agreement with SpaceX of Hawthorne, Calif., for use and occupancy of Launch Pad 39A, in the distance, to serve as a platform to support SpaceX's future launch activities. For more, visit http://www.nasa.gov/kennedy. Photo credit: NASA/Kim Shiflett

  10. Cumulative occupational mechanical exposures during working life and risk of sickness absence and disability pension: prospective cohort study.

    PubMed

    Sundstrup, Emil; Hansen, Åse Marie; Mortensen, Erik Lykke; Poulsen, Otto Melchior; Clausen, Thomas; Rugulies, Reiner; Møller, Anne; Andersen, Lars L

    2017-09-01

    Objectives The aim of this study was to determine the prospective association of cumulative mechanical exposure during working life with health-related labor market outcomes. Methods This prospective cohort study combines data from 5076 older workers (age 49-63 years) from the Copenhagen Aging and Midlife Biobank with a job exposure matrix and a national register containing information on social transfer payment. By coding individual job histories from the Danish version of ISCO-codes (International Standard Classification of Occupations), we calculated cumulative occupational mechanical exposures from a JEM for ton-years (lifting 1000 kg each day in one year), lifting-years (lifting loads weighing ≥20 kg >10 times each day in one year), kneeling-years (kneeling for one hour each day in one year) and vibration-years (whole-body vibration for one hour each day in one year). Cox-regression analyses estimated the relative risk of register-based long-term sickness absence (LTSA) and disability pension with cumulative occupational mechanical exposures throughout working life. Analyses were censored for competing events and adjusted for multiple confounders. Results During the follow-up period, 970 persons (19.3%) had ≥1 episode of LTSA and 85 persons (1.7%) were granted a disability pension. Number of ton-, lifting- and kneeling-years showed an exposure-response association with increased risk of LTSA (P<0.0001). In addition, both long term [≥20 years; hazard ratio (HR) 1.76 95% CI 1.39-2.22] and short term (<10 years; HR 1.20 95% CI 1.02-1.41) exposure to kneeling work increased the risk of LTSA. Lifting-years, but not the other mechanical exposures, were associated with risk of disability pension (HR 1.75 95% CI 1.01-3.04). Conclusions Cumulative occupational mechanical exposures during working life - such as lifting and kneeling work - increased the risk of LTSA. Importantly, being exposed to lifting increased the risk of disability pension.

  11. Rating Lift Cranes Operating on Platforms in the Ocean Environment SAE J-1366--Proposed SAE Recommended Practice (Version 4.0)

    DTIC Science & Technology

    1992-03-01

    Hueneme, CA 93043-5003 9. SPONSORING/MiONITORING AGENCY NAME(S) AND ADDRESSE(S) 10 . SPONSORINGINMONITORING AGENZY REPORT NUMBER Naval Facilities...8 6. Calculation Procedure .. .. ....... ...... ...... 10 7. Marine Crane Rating Chart Format .. ..... ...... ... 15 8...Rating for List. .. .... ....... ....... .... 16 9. Pendulation .. .. ....... ...... ....... ... 17 10 . References

  12. Lift estimation of Half-Rotating Wing in hovering flight

    NASA Astrophysics Data System (ADS)

    Wang, X. Y.; Dong, Y. P.; Qiu, Z. Z.; Zhang, Y. Q.; Shan, J. H.

    2016-11-01

    Half-Rotating Wing (HRW) is a new kind of flapping wing system with rotating flapping instead of oscillating flapping. Estimating approach of hovering lift which generated in hovering flight was important theoretical foundation to design aircraft using HRW. The working principle of HRW based on Half-Rotating Mechanism (HRM) was firstly introduced in this paper. Generating process of lift by HRW was also given. The calculating models of two lift mechanisms for HRW, including Lift of Flow Around Wing (LFAW) and Lift of Flow Dragging Wing (LFDW), were respectively established. The lift estimating model of HRW was further deduced, by which hovering lift for HRW with different angular velocity could be calculated. Case study using XFLOW software simulation indicates that the above estimating method was effective and feasible to predict roughly the hovering lift for a new HRW system.

  13. ECN-1606

    NASA Image and Video Library

    1967-01-11

    In this 1967 NASA Flight Reserch Center photograph the Lunar Landing Research Vehicle (LLRV) is viewed from the front. This photograph provideds a good view of the pilot’s platform with the restrictive cockpit view like that of he real Lunar Module (LM) When Apollo planning was underway in 1960, NASA was looking for a simulator to profile the descent to the Moon's surface. Three concepts surfaced: an electronic simulator, a tethered device, and the ambitious Dryden contribution, a free-flying vehicle. All three became serious projects, but eventually the NASA Flight Research Center’s (FRC) Lunar Landing Research Vehicle (LLRV) became the most significant one. After conceptual planning and meetings with engineers from Bell Aerosystems Company, Buffalo, N.Y., NASA FRC issued a $3.6 million production contract awarded in 1963, for delivery of the first of two vehicles for flight studies. Built of tubular aluminum alloy like a giant four-legged bedstead, the vehicle was to simulate a lunar landing profile from around 1500 feet to the Moon’s surface. The LLRV had a turbofan engine mounted vertically in a gimbal, with 4200 pounds of thrust. The engine, lifted the vehicle up to the test altitude and was then throttled back to support five-sixths of the vehicle's weight, thus simulating the reduced gravity of the Moon. Two lift rockets with thrust that could be varied from 100 to 500 pounds handled the LLRV's rate of descent and horizontal translations. Sixteen smaller rockets, mounted in pairs, gave the pilot control in pitch, yaw, and roll.. The pilot’s platform extended forward between two legs while an electronics platform, similarly located, extended rearward. The pilot had a zero-zero ejection seat that would then lift him away to safety. The two LLRVs were shipped from Bell to the FRC in April 1964, with program emphasis on vehicle No. 1. The first flight, Oct. 30, 1964, NASA research pilot Joe Walker flew it three times for a total of just under 60 seconds

  14. The relative importance of whole body vibration and occupational lifting as risk factors for low-back pain

    PubMed Central

    Palmer, K; Griffin, M; Syddall, H; Pannett, B; Cooper, C; Coggon, D

    2003-01-01

    Aims: To explore the impact of occupational exposure to whole body vibration (WBV) on low back pain (LBP) in the general population and to estimate the burden of LBP attributable to occupational WBV in comparison with that due to occupational lifting. Methods: A questionnaire including sections on WBV at work, LBP, and potential risk factors was mailed to a community sample of 22 194 men and women of working age. Sources and durations of exposure to occupational WBV were ascertained for the past week and personal vibration doses (eVDV) were estimated. Analysis was confined to subjects reporting exposures in the past week as typical of their work. Associations of LBP with eVDV, driving industrial vehicles, and occupational lifting were explored by logistic regression and attributable numbers were calculated. Results: Significant associations were found between daily lifting of weights greater than 10 kg at work and LBP, troublesome LBP (which made it difficult to put on hosiery), and sciatica (prevalence ratios 1.3 to 1.7); but the risk of these outcomes in both sexes varied little by eVDV and only weak associations were found with riding on industrial vehicles. Assuming causal associations, the numbers of cases of LBP in Britain attributable to occupational WBV were estimated to be 444 000 in men and 95 000 in women. This compared with an estimated 940 000 male cases and 370 000 female cases of LBP from occupational lifting. Conclusions: The burden of LBP in Britain from occupational exposure to WBV is smaller than that attributable to lifting at work. PMID:14504358

  15. Intelligent robots for planetary exploration and construction

    NASA Technical Reports Server (NTRS)

    Albus, James S.

    1992-01-01

    Robots capable of practical applications in planetary exploration and construction will require realtime sensory-interactive goal-directed control systems. A reference model architecture based on the NIST Real-time Control System (RCS) for real-time intelligent control systems is suggested. RCS partitions the control problem into four basic elements: behavior generation (or task decomposition), world modeling, sensory processing, and value judgment. It clusters these elements into computational nodes that have responsibility for specific subsystems, and arranges these nodes in hierarchical layers such that each layer has characteristic functionality and timing. Planetary exploration robots should have mobility systems that can safely maneuver over rough surfaces at high speeds. Walking machines and wheeled vehicles with dynamic suspensions are candidates. The technology of sensing and sensory processing has progressed to the point where real-time autonomous path planning and obstacle avoidance behavior is feasible. Map-based navigation systems will support long-range mobility goals and plans. Planetary construction robots must have high strength-to-weight ratios for lifting and positioning tools and materials in six degrees-of-freedom over large working volumes. A new generation of cable-suspended Stewart platform devices and inflatable structures are suggested for lifting and positioning materials and structures, as well as for excavation, grading, and manipulating a variety of tools and construction machinery.

  16. Calculation of the distributed loads on the blades of individual multiblade propellers in axial flow using linear and nonlinear lifting surface theories

    NASA Technical Reports Server (NTRS)

    Pesetskaya, N. N.; Timofeev, I. YA.; Shipilov, S. D.

    1988-01-01

    In recent years much attention has been given to the development of methods and programs for the calculation of the aerodynamic characteristics of multiblade, saber-shaped air propellers. Most existing methods are based on the theory of lifting lines. Elsewhere, the theory of a lifting surface is used to calculate screw and lifting propellers. In this work, methods of discrete eddies are described for the calculation of the aerodynamic characteristics of propellers using the linear and nonlinear theories of lifting surfaces.

  17. Examination of Air Force Crash Damaged or Disabled Aircraft Recovery Program Resourcing

    DTIC Science & Technology

    2011-06-01

    Positioning for Lift ................................................................................... 2 Figure 4. 26 and 15-Ton Airbags Under Wing...15 Figure 5. Manufacture Depiction of Airbag System...lifting capacities are calculated at an airbag working pressure of seven pounds per square inch. The lifting bag example below is from AGE

  18. STS-95 Space Shuttle Discovery rollout to Launch Pad 39B

    NASA Technical Reports Server (NTRS)

    1998-01-01

    Perched on the Mobile Launch Platform, in the early morning hours Space Shuttle Discovery approaches Launch Complex Pad 39B after a 6-hour, 4.2-mile trip from the Vehicle Assembly Building. At the launch pad, the orbiter, external tank and solid rocket boosters will undergo final preparations for the launch, scheduled to lift off Oct. 29. The mission includes research payloads such as the Spartan solar-observing deployable spacecraft, the Hubble Space Telescope Orbital Systems Test Platform, the International Extreme Ultraviolet Hitchhiker, as well as the SPACEHAB single module with experiments on space flight and the aging process.

  19. Making the practically impossible "Merely difficult"--Cryogenic FIB lift-out for "Damage free" soft matter imaging.

    PubMed

    Parmenter, Christopher D J; Fay, Michael W; Hartfield, Cheryl; Eltaher, Hoda M

    2016-04-01

    The preparation of thinned lamellae from bulk samples for transmission electron microscopy (TEM) analysis has been possible in the focussed ion beam scanning electron microscope (FIB-SEM) for over 20 years via the in situ lift-out method. Lift-out offers a fast and site specific preparation method for TEM analysis, typically in the field of materials science. More recently it has been applied to a low-water content biological sample (Rubino 2012). This work presents the successful lift-out of high-water content lamellae, under cryogenic conditions (cryo-FIB lift-out) and using a nanomanipulator retaining its full range of motion, which are advances on the work previously done by Rubino (2012). Strategies are explored for maintaining cryogenic conditions, grid attachment using cryo-condensation of water and protection of the lamella when transferring to the TEM. © 2016 Wiley Periodicals, Inc.

  20. End effector with astronaut foot restraint

    NASA Technical Reports Server (NTRS)

    Monford, Leo G., Jr. (Inventor)

    1991-01-01

    The combination of a foot restraint platform designed primarily for use by an astronaut being rigidly and permanently attached to an end effector which is suitable for attachment to the manipulator arm of a remote manipulating system is described. The foot restraint platform is attached by a brace to the end effector at a location away from the grappling interface of the end effector. The platform comprises a support plate provided with a pair of stirrups for receiving the toe portion of an astronaut's boots when standing on the platform and a pair of heel retainers in the form of raised members which are fixed to the surface of the platform and located to provide abutment surfaces for abutting engagement with the heels of the astronaut's boots when his toes are in the stirrups. The heel retainers preclude a backward sliding movement of the feet on the platform and instead require a lifting of the heels in order to extract the feet. The brace for attaching the foot restraint platform to the end effector may include a pivot or swivel joint to permit various orientations of the platform with respect to the end effector.

  1. Work activities and musculoskeletal complaints among preschool workers.

    PubMed

    Grant, K A; Habes, D J; Tepper, A L

    1995-12-01

    The potential for musculoskeletal trauma among preschool workers has been largely unexplored in the United States. This case report describes an investigation conducted to identify and evaluate possible causes of back and lower extremity pain among 22 workers at a Montessori day care facility. Investigators met with and distributed a questionnaire to school employees, and made measurements of workstation and furniture dimensions. Investigators also recorded the normal work activities of school employees on videotape, and performed a work sampling study to estimate the percentage of time employees spend performing various tasks and in certain postures. Questionnaire results from 18 employees indicated that back pain/discomfort was a common musculoskeletal complaint, reported by 61% of respondents. Neck/shoulder pain, lower extremity pain and hand/wrist pain were reported by 33, 33 and 11% of respondents, respectively. Observation and analysis of work activities indicated that employees spend significant periods of time kneeling, sitting on the floor, squatting, or bending at the waist. Furthermore, staff members who work with smaller children (i.e. six weeks to 18 months of age) performed more lifts and assumed more awkward lower extremity postures than employees who work with older children (3-4 years of age). Analysis of two lifting tasks using the revised NIOSH lifting equation indicated that employees who handle small children may be at increased risk of lifting-related low back pain. Investigators concluded that day care employees at this facility are at increased risk of low back pain and lower extremity (i.e. knee) injury due to work activities that require awkward or heavy lifts, and static working postures. Recommendations for reducing or eliminating these risks by modifying the workplace and changing the organization and methods of work are presented.

  2. 46 CFR 163.002-21 - Approval tests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... raised and lowered under power operation until a total distance of at least 150 meters (500 feet) has... least 5 meters (16 feet). The average speed of raising the ladder or lift platform and the average lowering speed during this test must both be between 15 and 21 meters per minute (50 and 70 feet per minute...

  3. 36. HISTORIC GENERAL VIEW LOOKING NORTH DOWN THE FLAME TRENCH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    36. HISTORIC GENERAL VIEW LOOKING NORTH DOWN THE FLAME TRENCH AT THE TEST STAND. NOTE THE MOTORIZED LIFT TO THE LEFT OF THE TEST STAND, USED TO ACCESS THE INSTRUMENTATION PLATFORM ('BIRDCAGE') MOUNTED ON TOP OF THE ROCKET DURING TEST FIRINGS. - Marshall Space Flight Center, Redstone Rocket (Missile) Test Stand, Dodd Road, Huntsville, Madison County, AL

  4. The evaluation of team lifting on physical work demands and workload in ironworkers.

    PubMed

    van der Molen, Henk F; Visser, Steven; Kuijer, P Paul F M; Faber, Gert; Hoozemans, Marco J M; van Dieën, Jaap H; Frings-Dresen, Monique H W

    2012-01-01

    Lifting and carrying heavy loads occur frequently among ironworkers and result in high prevalence and incidence rates of low back complaints, injuries and work-disability. From a health perspective, little information is available on the effect of team lifting on work demands and workload. Therefore, the objective of this study was to compare the effects of team lifting of maximally 50 kg by two ironworkers (T50) with team lifting of maximally 100 kg by four ironworkers (T100). This study combined a field and laboratory study with the following outcome measures: duration and frequency of tasks and activities, energetic workload, perceived discomfort and maximal compression forces (Fc peak) on the low back. The physical work demands and workload of an individual iron worker during manual handling of rebar materials of 100 kg with four workers did not differ from the manual handling of rebar materials of 50 kg with two workers, with the exception of low back discomfort and Fc peak. The biomechanical workload of the low back exceeded for both T50 and T100 the NIOSH threshold limit of 3400N. Therefore, mechanical transport or other effective design solutions should be considered to reduce the biomechanical workload of the low back and the accompanying health risks among iron workers.

  5. Design of a portable powered seat lift

    NASA Technical Reports Server (NTRS)

    Weddendorf, Bruce

    1993-01-01

    People suffering from degenerative hip or knee joints find sitting and rising from a seated position very difficult. These people can rely on large stationary chairs at home, but must ask others for assistance when rising from any other chair. An orthopedic surgeon identified to the MSFC Technology Utilization Office the need for development of a portable device that could perform a similar function to the stationary lift chairs. The MSFC Structural Development Branch answered the Technology Utilization Office's request for design of a portable powered seat lift. The device is a seat cushion that opens under power, lifting the user to near-standing positions. The largest challenge was developing a mechanism to provide a stable lift over the large range of motion needed, and fold flat enough to be comfortable to sit on. CAD 3-D modeling was used to generate complete drawings for the prototype, and a full-scale working model of the Seat lift was made based on the drawings. The working model is of low strength, but proves the function of the mechanism and the concept.

  6. Kennedy Space Center: Creating a Spaceport Reality from the Dreams of Many

    NASA Technical Reports Server (NTRS)

    Gray, James A.; Colloredo, Scott

    2012-01-01

    On December 17, 1903, Orville Wright piloted the first powered airplane only 20 feet above the ground near Kitty Hawk, North Carolina. The flight lasted 12 seconds and covered 120 feet. Who would have guessed that the bizarre looking contraption developed by brothers in the bicycle business would lay the ground work eventually resulting in over a million passengers moved daily in a sky filled with the contrails of jets flying at over 30,000 feet in elevation and over 500 miles per hour. Similarly, who would have guessed that the destructive nature of V-2 rockets of Germany would spark the genesis of spaceflight to explore our solar system and beyond? Yet the interest in using the Kennedy Space Center (KSC) continues to grow. Potential customers have expressed interest in KSC as a location for testing new rocket engines, servicing the world's largest airborne launching platform for drop-launch rockets, developing multi-use launch platforms that permit diverse customers to use the same launch platform, developing new spacecraft, and implementing advanced modifications for lifting 150 metric ton payloads to low earth orbit. The multitude of customers has grown and with this growth comes a need to provide a command, control, communication, and range infrastructure that maximizes flexibility and reconfigurability to address a much more frequent launch rate of diverse vehicles and spacecraft. The Ground Systems Development and Operations (GSDO) Program Office at KSC is embarking upon these developments to realize the dream of a robust spaceport. Many unique technical trade studies have been completed or are underway to successfully transition KSC into a multi-user customer focused spaceport. Like the evolution of the airplane, GSDO is working to transform KSC infrastructures that will turn once unthinkable space opportunities into a reality for today.

  7. Modular cryogenic interconnects for multi-qubit devices.

    PubMed

    Colless, J I; Reilly, D J

    2014-11-01

    We have developed a modular interconnect platform for the control and readout of multiple solid-state qubits at cryogenic temperatures. The setup provides 74 filtered dc-bias connections, 32 control and readout connections with -3 dB frequency above 5 GHz, and 4 microwave feed lines that allow low loss (less than 3 dB) transmission 10 GHz. The incorporation of a radio-frequency interposer enables the platform to be separated into two printed circuit boards, decoupling the simple board that is bonded to the qubit chip from the multilayer board that incorporates expensive connectors and components. This modular approach lifts the burden of duplicating complex interconnect circuits for every prototype device. We report the performance of this platform at milli-Kelvin temperatures, including signal transmission and crosstalk measurements.

  8. The use of buoyancy to lift heavy objects from the sea

    NASA Astrophysics Data System (ADS)

    Fiske, R. P.

    1981-06-01

    To recover oil from economically marginal offshore fields the re-use of production platforms has been considered. Re-use involves severing the jacket from the seabed, rotating the jacket to the horizontal and lifting it through the air/sea interface in a configuration suitable for towing. Five systems are considered for use in the recovery process. Two systems currently used for installation are found suitable for modification to recover jackets. They are the pontoon barge system and the self-floating tower. Major problems to be overcome in modifying for retraction are mating of the pontoon barge with the tower, developing a pile system which can be refurbished, and ensuring transverse stability on retraction through the air/sea interface.

  9. Application work risk of manual material handling operators using different lifting methods

    NASA Astrophysics Data System (ADS)

    Anizar; Matondang, AR; Sibarani, JA

    2018-02-01

    This study observed the activity of lifting and moving crates containing bottles at a pallet station in a carbonated drink factory. The activity of moving crates, each weighing 15 kg, is performed by four operators using different methods. An operator manually moves 250 crates daily and often takes rest during working. This study aims to find the most efficient method, that is using the least energy, to move crates. The workload is assessed using the method of Cardiovascular Strain Load (CVL) and energy expenditure. Operators’ arterial pulse is measured for 1 minute right before they start working and after they finish working; this is done to obtain work arterial pulse and rest arterial pulse. The way operators lift crates is analyzed using biomechanics. It is found that fatigue is experienced by all operators, with the exception of the 3rd operator who has a %CVL number below 30%. He positions the pallet to be parallel to the conveyor, and then stand in between during the lifting process. He only rotates his body to move the crate from the conveyor onto the pallet, requiring only little energy. This is one of the reasons why the %CVL number is lower than the other operators.

  10. Instrumentation for Performance, Blade Loads and Flowfield Measurement of Novel Hover-Capable Meso-Scale Aerial Platforms

    DTIC Science & Technology

    2016-12-07

    many DoD sponsored MAV projects including one task from ARO and another one as part of Army/Navy/ NASA - sponsored VLRCOE at Maryland all requiring...has undertaken many DoD sponsored MAV projects including one task from ARO and another one as part of Army/Navy/ NASA sponsored Vertical Lift Research

  11. Nonholonomic camera-space manipulation using cameras mounted on a mobile base

    NASA Astrophysics Data System (ADS)

    Goodwine, Bill; Seelinger, Michael J.; Skaar, Steven B.; Ma, Qun

    1998-10-01

    The body of work called `Camera Space Manipulation' is an effective and proven method of robotic control. Essentially, this technique identifies and refines the input-output relationship of the plant using estimation methods and drives the plant open-loop to its target state. 3D `success' of the desired motion, i.e., the end effector of the manipulator engages a target at a particular location with a particular orientation, is guaranteed when there is camera space success in two cameras which are adequately separated. Very accurate, sub-pixel positioning of a robotic end effector is possible using this method. To date, however, most efforts in this area have primarily considered holonomic systems. This work addresses the problem of nonholonomic camera space manipulation by considering the problem of a nonholonomic robot with two cameras and a holonomic manipulator on board the nonholonomic platform. While perhaps not as common in robotics, such a combination of holonomic and nonholonomic degrees of freedom are ubiquitous in industry: fork lifts and earth moving equipment are common examples of a nonholonomic system with an on-board holonomic actuator. The nonholonomic nature of the system makes the automation problem more difficult due to a variety of reasons; in particular, the target location is not fixed in the image planes, as it is for holonomic systems (since the cameras are attached to a moving platform), and there is a fundamental `path dependent' nature of nonholonomic kinematics. This work focuses on the sensor space or camera-space-based control laws necessary for effectively implementing an autonomous system of this type.

  12. Measurements of Shear Lift Force on a Bubble in Channel Flow in Microgravity

    NASA Technical Reports Server (NTRS)

    Nahra, Henry K.; Motil, Brian J.; Skor, Mark

    2003-01-01

    Under microgravity conditions, the shear lift force acting on bubbles, droplets or solid particles in multiphase flows becomes important because under normal gravity, this hydrodynamic force is masked by buoyancy. This force plays an important role in furnishing the detachment process of bubbles in a setting where a bubble suspension is needed in microgravity. In this work, measurements of the shear lift force acting on a bubble in channel flow are performed. The shear lift force is deduced from the bubble kinematics using scaling and then compared with predictions from models in literature that address different asymptotic and numerical solutions. Basic trajectory calculations are then performed and the results are compared with experimental data of position of the bubble in the channel. A direct comparison of the lateral velocity of the bubbles is also made with the lateral velocity prediction from investigators, whose work addressed the shear lift on a sphere in different two-dimensional shear flows including Poiseuille flow.

  13. The hybrid assistive limb (HAL) for Care Support successfully reduced lumbar load in repetitive lifting movements.

    PubMed

    Miura, Kousei; Kadone, Hideki; Koda, Masao; Abe, Tetsuya; Kumagai, Hiroshi; Nagashima, Katsuya; Mataki, Kentaro; Fujii, Kengo; Noguchi, Hiroshi; Funayama, Toru; Kawamoto, Hiroaki; Sankai, Yoshiyuki; Yamazaki, Masashi

    2018-05-03

    Work-related low back pain is a serious socioeconomic problem. This study examined whether HAL for Care Support, which is a newly developed wearable robot, would decrease lumbar fatigue and improve lifting performance during repetitive lifting movements. Eighteen healthy volunteers (11 men, 7 women) performed repetitive stoop lifting movements of a cardboard box weighing 12 kg as many times as possible. The first lifting trial was executed without HAL for Care Support, and the second was with it. We evaluated the VAS of lumbar fatigue as the lumbar load and the number of lifts and the lifting time as lifting performance. Without HAL for Care Support, the mean VAS of lumbar fatigue, the number of lifts and lifting time were 68 mm, 60 and 230 s; with HAL for Care Support, they were 51 mm, 87 and 332 s, respectively. Both lifting performance measures were significantly improved by using HAL for Care Support (Fig. 2). A power analysis showed that there was sufficient statistical power for the VAS of lumbar fatigue (0.99), the number of lifts (0.92), and lifting time (0.93). All participants performed their repetitive lifting trials safely. There were no adverse events caused by using HAL for Care Support. In conclusion, the HAL for Care Support can decrease lumbar load and improve the lifting performance during repetitive stoop lifting movements in healthy adults. Copyright © 2018. Published by Elsevier Ltd.

  14. Isokinetic and isometric lifting capacity of Chinese in relation to the physical demand of job.

    PubMed

    Luk, K D K; Lu, W W; Kwan, W W; Hu, Y; Wong, Y W; Law, K K P; Leong, J C Y

    2003-03-01

    The aim of the study was to formulate normative data for the lifting capacities of a normal Chinese population, in order to establish a basic foundation for further studies and to investigate the relationship between individual attributes including age, gender, height, weight, job physical demand and each type of lifting capacity. Isokinetic and isometric lifting strength at low, waist and shoulder assessment levels were measured using the LIDO Workset II based on a sample of 93 normal Chinese adults (63 men and 30 women) between the ages of 21-51. The 50th percentile score for adult Chinese female's lifting strength was 17.71% lower than the American female while the adult Chinese male's lifting strength was 14.94% lower than the American male. Lifting forces were higher in the 20-40 year age group. The isometric work mode had considerable impact on the lifting capacities, with shoulder level having the highest lifting capacities. The gender and body weight had a significant positive correlation to lifting capacity while job physical demand had a moderate correlation. Age and body heights were weakly correlated to lifting capacity. Copyright 2003 Elsevier Science Ltd.

  15. Predicting Endurance Time in a Repetitive Lift and Carry Task Using Linear Mixed Models

    PubMed Central

    Ham, Daniel J.; Best, Stuart A.; Carstairs, Greg L.; Savage, Robert J.; Straney, Lahn; Caldwell, Joanne N.

    2016-01-01

    Objectives Repetitive manual handling tasks account for a substantial portion of work-related injuries. However, few studies report endurance time in repetitive manual handling tasks. Consequently, there is little guidance to inform expected work time for repetitive manual handling tasks. We aimed to investigate endurance time and oxygen consumption of a repetitive lift and carry task using linear mixed models. Methods Fourteen male soldiers (age 22.4 ± 4.5 yrs, height 1.78 ± 0.04 m, body mass 76.3 ± 10.1 kg) conducted four assessment sessions that consisted of one maximal box lifting session and three lift and carry sessions. The relationships between carry mass (range 17.5–37.5 kg) and the duration of carry, and carry mass and oxygen consumption, were assessed using linear mixed models with random effects to account for between-subject variation. Results Results demonstrated that endurance time was inversely associated with carry mass (R2 = 0.24), with significant individual-level variation (R2 = 0.85). Normalising carry mass to performance in a maximal box lifting test improved the prediction of endurance time (R2 = 0.40). Oxygen consumption presented relative to total mass (body mass, external load and carried mass) was not significantly related to lift and carry mass (β1 = 0.16, SE = 0.10, 95%CI: -0.04, 0.36, p = 0.12), indicating that there was no change in oxygen consumption relative to total mass with increasing lift and carry mass. Conclusion Practically, these data can be used to guide work-rest schedules and provide insight into methods assessing the physical capacity of workers conducting repetitive manual handling tasks. PMID:27379902

  16. Changes in spine loading patterns throughout the workday as a function of experience, lift frequency, and personality.

    PubMed

    Chany, Anne-Marie; Parakkat, Julia; Yang, Gang; Burr, Deborah L; Marras, William S

    2006-01-01

    Psychosocial stressors have been associated with low back pain reporting. However, response to psychosocial risk factors may be dependent on the individual's personality type that, in turn, can affect muscle recruitment and spine loading. This study explores how personality might be associated with spine loading during repetitive lifting performed throughout an entire work shift. Assess spine loading as a function of an individual's personality type during repetitive, long-term exposure to a materials handling tasks. Laboratory experiment where experienced and inexperienced participants performed repetitive, asymmetric lifts at various load and lift frequency levels throughout a series of 8-hour exposure periods. Spine loads were monitored throughout the work period. Twelve novice and 12 experienced materials handlers who were asymptomatic for back pain. Spine compression, anterior-posterior (A/P) shear, and lateral shear at the L5-S1 level. Participants were categorized into personality types based upon the Myers-Briggs personality type indicator. An electromyography-assisted biomechanical model was used to assess spine compression, A/P shear, and lateral shear throughout the exposure period. The results indicate that intuitors had higher shear spinal loading regardless of moment exposure, lift frequency, and time through the work period, compared with the sensor personality type. In addition, higher spine compressive and shear forces occurred in the perceiver personality compared with the judgers' personality trait, regardless of moment and, often, lift frequency. Novice lifters typically experienced greater spine loading. The results suggest that when there exists a personality-job environment mismatch, spinal loading increases via an increase in antagonistic co-contraction. The trends suggest that inherent personality characteristics may play a role in one's motor control strategies when performing a repetitive lifting task.

  17. Effectiveness of ice-vest cooling in prolonging work tolerance time during heavy exercise in the heat for personnel wearing Canadian forces chemical defense ensembles

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bain, B.

    Effectiveness of a portable, ice-pack cooling vest (Steelevest) in prolonging work tolerance time in chemical defense clothing in the heat (33 C dry bulb, 33% relative humidity or 25 C WBGT) was evaluated while subjects exercised at a metabolic rate of approx. 700 watts. Subjects were six male volunteers. The protocol consisted of a 20 minute treadmill walk at 1.33 m/s. and 7.5% grade, followed by 15 minutes of a lifting task, 5 minutes rest, then another 20 minutes of lifting task for a total of one hour. The lifting task consisted of lifting of 20 kg box, carrying itmore » 3 meters and setting it down. This was followed by a 6 m walk (3m back to the start point and 3 m back to the box) 15 sec after which the lifting cycle began again. The work was classified as heavy as previously defined. This protocol was repeated until the subjects were unable to continue or they reached a physiological endpoint. Time to voluntary cessation or physiological endpoint was called the work tolerance time. Physiological endpoints were rectal temperature of 39 C, heart rate exceeding 95% of maximum for two consecutive minutes or visible loss of motor control or nausea. The cooling vest had no effect on work tolerance time, rate of rise of rectal temperature or sweat loss. It was concluded that the Steelvest ice-vest is ineffective in prolonging work tolerance time and preventing increases in rectal temperature while wearing chemical protective clothing.« less

  18. Satellite data lift the veil on offshore platforms in the South China Sea

    NASA Astrophysics Data System (ADS)

    Liu, Yongxue; Sun, Chao; Sun, Jiaqi; Li, Hongyi; Zhan, Wenfeng; Yang, Yuhao; Zhang, Siyu

    2016-09-01

    Oil and gas exploration in the South China Sea (SCS) has garnered global attention recently; however, uncertainty regarding the accurate number of offshore platforms in the SCS, let alone their detailed spatial distribution and dynamic change, may lead to significant misjudgment of the true status of offshore hydrocarbon production in the region. Using both fresh and archived space-borne images with multiple resolutions, we enumerated the number, distribution, and annual rate of increase of offshore platforms across the SCS. Our results show that: (1) a total of 1082 platforms are present in the SCS, mainly located in shallow-water; and (2) offshore oil/gas exploitation in the SCS is increasing in intensity and advancing from shallow to deep water, and even to ultra-deep-water. Nevertheless, our findings suggest that oil and gas exploration in the SCS may have been over-estimated by one-third in previous reports. However, this overestimation does not imply any amelioration of the potential for future maritime disputes, since the rate of increase of platforms in disputed waters is twice that in undisputed waters.

  19. Satellite data lift the veil on offshore platforms in the South China Sea

    PubMed Central

    Liu, Yongxue; Sun, Chao; Sun, Jiaqi; Li, Hongyi; Zhan, Wenfeng; Yang, Yuhao; Zhang, Siyu

    2016-01-01

    Oil and gas exploration in the South China Sea (SCS) has garnered global attention recently; however, uncertainty regarding the accurate number of offshore platforms in the SCS, let alone their detailed spatial distribution and dynamic change, may lead to significant misjudgment of the true status of offshore hydrocarbon production in the region. Using both fresh and archived space-borne images with multiple resolutions, we enumerated the number, distribution, and annual rate of increase of offshore platforms across the SCS. Our results show that: (1) a total of 1082 platforms are present in the SCS, mainly located in shallow-water; and (2) offshore oil/gas exploitation in the SCS is increasing in intensity and advancing from shallow to deep water, and even to ultra-deep-water. Nevertheless, our findings suggest that oil and gas exploration in the SCS may have been over-estimated by one-third in previous reports. However, this overestimation does not imply any amelioration of the potential for future maritime disputes, since the rate of increase of platforms in disputed waters is twice that in undisputed waters. PMID:27641542

  20. Hierarchical High Level Information Fusion (H2LIFT)

    DTIC Science & Technology

    2008-09-15

    platform increases, human decision makers are being overwhelmed with data. In this research, the CUBRC proposed a cost effective two-year program of...8 5.1.1.3.5 Geodetic vs. Geocentric Latitude ....................................................................... 9 5.1.1.3.6...are being overwhelmed with data. In this research, the CUBRC proposed a cost effective two-year program of a novel approach in the near "real-time

  1. Missions and vehicle concepts for modern, propelled, lighter-than-air vehicles

    NASA Technical Reports Server (NTRS)

    Ardema, M. D.

    1984-01-01

    The results of studies conducted over the last 15 years to assess missions and vehicle concepts for modern, propelled, lighter-than-air vehicles (airships) were surveyed. Rigid and non-rigid airship concepts are considered. The use of airships for ocean patrol and surveillance is discussed along with vertical heavy lift airships. Military and civilian needs for high altitude platforms are addressed.

  2. Inertial particle focusing in serpentine channels on a centrifugal platform

    NASA Astrophysics Data System (ADS)

    Shamloo, Amir; Mashhadian, Ali

    2018-01-01

    Inertial particle focusing as a powerful passive method is widely used in diagnostic test devices. It is common to use a curved channel in this approach to achieve particle focusing through balancing of the secondary flow drag force and the inertial lift force. Here, we present a focusing device on a disk based on the interaction of secondary flow drag force, inertial lift force, and centrifugal forces to focus particles. By choosing a channel whose cross section has a low aspect ratio, the mixing effect of the secondary flow becomes negligible. To calculate inertial lift force, which is exerted on the particle from the fluid, the interaction between the fluid and particle is investigated accurately through implementation of 3D Direct Numerical Solution (DNS) method. The particle focusing in three serpentine channels with different corner angles of 75°, 85°, and 90° is investigated for three polystyrene particles with diameters of 8 μm, 9.9 μm, and 13 μm. To show the simulation reliability, the results obtained from the simulations of two examples, namely, particle focusing and centrifugal platform, are verified against experimental counterparts. The effects of angular velocity of disk on the fluid velocity and on the focusing parameters are studied. Fluid velocity in a channel with corner angle of 75° is greater than two other channels. Furthermore, the particle equilibrium positions at the cross section of channel are obtained at the outlet. There are two equilibrium positions located at the centers of the long walls. Finally, the effect of particle density on the focusing length is investigated. A particle with a higher density and larger diameter is focused in a shorter length of the channel compared to its counterpart with a lower density and shorter diameter. The channel with a corner angle of 90° has better focusing efficiency compared to other channels. This design focuses particles without using any pump or sheath flow. Inertial particle focusing on centrifugal platform, which rarely has been studied, can be used for a wide range of diagnostic lab-on-a-disk device.

  3. Aesthetic ultrasound therapy

    NASA Astrophysics Data System (ADS)

    Barthe, Peter G.; Slayton, Michael H.

    2012-10-01

    Ultrasound provides key benefits in aesthetic surgery compared to laser and RF based energy sources. We present results of research, development, pre-clinical and clinical studies, regulatory clearance and commercialization of a revolutionary non-invasive aesthetic ultrasound imaging and therapy system. Clinical applications for this platform include non-invasive face-lifts, brow-lifts, and neck-lifts achieved through fractionated treatment of the superficial musculoaponeurotic system (SMAS) and subcutaneous tissue. Treatment consists of placing a grid of micro-coagulative lesions on the order of 1 mm3 at depths in skin of 1 to 6 mm, source energy levels of 0.1 to 3 J, and spacing on the order of 1.5 mm, from 4 to 10 MHz dual-mode image/treat transducers. System details are described, as well as a regulatory pathway consisting of acoustic and bioheat simulations, source characterization (hydrophone, radiation force, and Schlieren), pre-clinical studies (porcine skin ex vivo, in vivo, and human cadaver), human safety studies (treat and resect) and efficacy trials which culminated in FDA clearance (2009) under a new device classification and world-wide usage. Clinical before and after photographs are presented which validate the clinical approach.

  4. Maximum acceptable weight of lift reflects peak lumbosacral extension moments in a functional capacity evaluation test using free style, stoop and squat lifting.

    PubMed

    Kuijer, P P F M; van Oostrom, S H; Duijzer, K; van Dieën, J H

    2012-01-01

    It is unclear whether the maximum acceptable weight of lift (MAWL), a common psychophysical method, reflects joint kinetics when different lifting techniques are employed. In a within-participants study (n = 12), participants performed three lifting techniques--free style, stoop and squat lifting from knee to waist level--using the same dynamic functional capacity evaluation lifting test to assess MAWL and to calculate low back and knee kinetics. We assessed which knee and back kinetic parameters increased with the load mass lifted, and whether the magnitudes of the kinetic parameters were consistent across techniques when lifting MAWL. MAWL was significantly different between techniques (p = 0.03). The peak lumbosacral extension moment met both criteria: it had the highest association with the load masses lifted (r > 0.9) and was most consistent between the three techniques when lifting MAWL (ICC = 0.87). In conclusion, MAWL reflects the lumbosacral extension moment across free style, stoop and squat lifting in healthy young males, but the relation between the load mass lifted and lumbosacral extension moment is different between techniques. Tests of maximum acceptable weight of lift (MAWL) from knee to waist height are used to assess work capacity of individuals with low-back disorders. This article shows that the MAWL reflects the lumbosacral extension moment across free style, stoop and squat lifting in healthy young males, but the relation between the load mass lifted and lumbosacral extension moment is different between techniques. This suggests that standardisation of lifting technique used in tests of the MAWL would be indicated if the aim is to assess the capacity of the low back.

  5. Microfluidic inertial focusing fundamentals, limitations and applications for biomedical sample processing

    NASA Astrophysics Data System (ADS)

    Reece, Amy E.

    The microfabrication of microfluidic control systems and advances in molecular amplification tools has enabled the miniaturization of single cell analytical platforms for the efficient, highly selective enumeration and molecular characterization of rare and diseased cells from clinical samples. In many cases, the high-throughput nature of microfluidic inertial focusing has enabled the popularization of this new class of Lab-on-a-Chip devices that exhibit numerous advantages over conventional methods as prognostic and diagnostic tools. Inertial focusing is the passive, sheathless alignment of particles and cells to precise spatiotemporal equilibrium positions that arise from a force balance between opposing inertial lift forces and hydrodynamic repulsions. The applicability of inertial focusing to a spectrum of filtration, separation and encapsulation challenges places heavy emphasis upon the accurate description of the hydrodynamic forces responsible for predictable inertial focusing behavior. These inertial focusing fundamentals, limitations and their applications are studied extensively throughout this work.

  6. Flight directors for STOl aircraft

    NASA Technical Reports Server (NTRS)

    Rabin, U. H.

    1983-01-01

    Flight director logic for flight path and airspeed control of a powered-lift STOL aircraft in the approach, transition, and landing configurations are developed. The methods for flight director design are investigated. The first method is based on the Optimal Control Model (OCM) of the pilot. The second method, proposed here, uses a fixed dynamic model of the pilot in a state space formulation similar to that of the OCM, and includes a pilot work-load metric. Several design examples are presented with various aircraft, sensor, and control configurations. These examples show the strong impact of throttle effectiveness on the performance and pilot work-load associated with manual control of powered-lift aircraft during approach. Improved performed and reduced pilot work-load can be achieved by using direct-lift-control to increase throttle effectiveness.

  7. Miscarriage and occupational activity: a systematic review and meta-analysis regarding shift work, working hours, lifting, standing, and physical workload.

    PubMed

    Bonde, Jens Peter; Jørgensen, Kristian Tore; Bonzini, Matteo; Palmer, Keith T

    2013-07-01

    Previous studies have indicated that shift work, long working hours, and prevalent workplace exposures such as lifting, standing, and physical workload increase the risk of miscarriage, but the evidence is conflicting. We conducted a systematic review of original research reports. A search in Medline and EMBASE 1966-2012 identified 30 primary papers reporting the relative risk (RR) of miscarriage according to ≥1 of 5 occupational activities of interest. Following an assessment of completeness of reporting, confounding, and bias, each risk estimate was characterized as more or less likely to be biased. Studies with equivalent measures of exposure were pooled to obtain a weighted common risk estimate. Sensitivity analyses excluded studies most likely to be biased. Working fixed nights was associated with a moderately increased risk of miscarriage (pooled RR 1.51 [95% confidence interval (95% CI) 1.27-1.78, N=5), while working in 3-shift schedules, working for 40-52 hours weekly, lifting >100 kg/day, standing >6-8 hours/day and physical workload were associated with small risk increments, with the pooled RR ranging from 1.12 (3-shift schedule, N=7) to 1.36 (working hours, N=10). RR for working hours and standing became smaller when analyses were restricted to higher quality studies. These largely reassuring findings do not provide a strong case for mandatory restrictions in relation to shift work, long working hours, occupational lifting, standing, and physical workload. Considering the limited evidence base, however, it may be prudent to advise women against work entailing high levels of these exposures and women with at-risk pregnancies should receive tailored individual counseling.

  8. Implementation and adoption of mechanical patient lift equipment in the hospital setting: The importance of organizational and cultural factors.

    PubMed

    Schoenfisch, Ashley L; Myers, Douglas J; Pompeii, Lisa A; Lipscomb, Hester J

    2011-12-01

    Work focused on understanding implementation and adoption of interventions designed to prevent patient-handling injuries in the hospital setting is lacking in the injury literature and may be more insightful than more traditional evaluation measures. Data from focus groups with health care workers were used to describe barriers and promoters of the adoption of patient lift equipment and a shift to a "minimal-manual lift environment" at two affiliated hospitals. Several factors influencing the adoption of the lift equipment and patient-handling policy were noted: time, knowledge/ability, staffing, patient characteristics, and organizational and cultural aspects of work. The adoption process was complex, and considerable variability by hospital and across units was observed. The use of qualitative data can enhance the understanding of factors that influence implementation and adoption of interventions designed to prevent patient-handling injuries among health care workers. Copyright © 2011 Wiley Periodicals, Inc.

  9. KSC-98pc507

    NASA Image and Video Library

    1998-04-17

    KENNEDY SPACE CENTER, FLA. -- The Space Shuttle Columbia lifts off from Launch Pad 39B at 2:19 p.m. EDT Apr. 17 to begin the nearly 17-day STS-90 Neurolab mission. A torrent of water is seen flowing onto the mobile launcher platform as several large quench nozzles, or "rainbirds," mounted on platform's surface operate as a sound suppression system. The crew members are Commander Richard Searfoss, Pilot Scott Altman, Mission Specialists Richard Linnehan, D.V.M., Dafydd (Dave) Williams, M.D., with the Canadian Space Agency, and Kathryn (Kay) Hire; and Payload Specialists Jay Buckey, M.D., and James Pawelczyk, Ph.D. Investigations during the Neurolab mission will focus on the effects of microgravity on the nervous system

  10. 76 FR 40617 - Drawbridge Operation Regulation; Gulf Intracoastal Waterway, Near Hackberry, LA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-11

    ...) vertical lift bridge across the Gulf Intracoastal Waterway, mile 243.8 west of Harvey Lock, near Hackberry... work from the operating schedule for the vertical lift bridge on the SR 27 (Ellender Ferry) across the...

  11. 78 FR 9588 - Drawbridge Operation Regulations; Saugus River, Lynn and Revere, MA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-11

    ... scaffolding be attached to the bascule lift span to access work area. DATES: This deviation is effective from... facilitate rehabilitation of the bridge towers that requires scaffolding be attached to the bascule lift span...

  12. Research on speed control of secondary regulation lifting system of parking equipment

    NASA Astrophysics Data System (ADS)

    Zang, Faye

    2005-12-01

    Hydrostatic transmission with secondary regulation is a new kind of hydrostatic transmission that can regenerate inertial and gravitational energy of load. On the basis of an in-depth analysis of the working principles and energy-saving mechanisms of the parking equipment lifting systems with, secondary regulating technology, this paper proposes a method of regenerating a lifting system's inertial energy by controlling rotational speed and reclaiming the gravitational energy by use of a constant rotational speed. Considering large changes of the parameters of lifting systems and then non-linearity, a fuzzy control was adopted to control the lifting system, and a mathematical model of the system was established. By simulation and experiment of the lifting system, the conclusion was reached a lifting system's braking achieved by controlling rotational speed is reliable and stable at a definite speed. It also permits changing the efficiency of recovery by changing the rotational speed. The design power of the lifting system can be chosen in terms of the system's average power, so the system's power can be reduced and energy savings achieved.

  13. A Comparison of Platforms for the Aerial Exploration of Titan

    NASA Technical Reports Server (NTRS)

    Wright, Henry S.; Gasbarre, Joseph F.; Levine, Joel S.

    2005-01-01

    Exploration of Titan, envisioned as a follow-on to the highly successful Cassini-Huygens mission, is described in this paper. A mission blending measurements from a dedicated orbiter and an in-situ aerial explorer is discussed. Summary description of the science rationale and the mission architecture, including the orbiter, is provided. The mission has been sized to ensure it can be accommodated on an existing expendable heavy-lift launch vehicle. A launch to Titan in 2018 with a 6-year time of flight to Titan using a combination of Solar Electric Propulsion and aeroassist (direct entry and aerocapture) forms the basic mission architecture. A detailed assessment of different platforms for aerial exploration of Titan has been performed. A rationale for the selection of the airship as the baseline platform is provided. Detailed description of the airship, its subsystems, and its operational strategies are provided.

  14. STS-106 orbiter Atlantis rolls over to the VAB

    NASA Technical Reports Server (NTRS)

    2000-01-01

    The orbiter Atlantis heads toward the open door of the Vehicle Assembly Building (VAB) on the north side. In the VAB it will be lifted to vertical and placed aboard the mobile launcher platform (MLP) for stacking with the solid rocket boosters and external tank. Atlantis is scheduled to launch Sept. 8 on mission STS-106, the fourth construction flight to the International Space Station, with a crew of seven.

  15. STS-106 orbiter Atlantis rolls over to the VAB

    NASA Technical Reports Server (NTRS)

    2000-01-01

    Inside the Vehicle Assembly Building (VAB), overhead cranes move above the orbiter Atlantis in order to lift it to vertical. When vertical, the orbiter will be placed aboard the mobile launcher platform (MLP) for stacking with the solid rocket boosters and external tank. Atlantis is scheduled to launch Sept. 8 on mission STS-106, the fourth construction flight to the International Space Station, with a crew of seven.

  16. Tolerability to prolonged lifting tasks. A validation of the recommended limits.

    PubMed

    Capodaglio, P; Bazzini, G

    1997-01-01

    Prolonged physical exertion is subjectively regulated by the perception of effort. This preliminary study was conducted to validate the use of subjective perceptions of effort in assessing objectively tolerable workloads for prolonged lifting tasks. Ten healthy male subjects tested their maximal lifting capacity (MLC) on a lift dynamometer (LidoLift, Loredan Biomed., West Sacramento, CA) and underwent incremental and 30-minute endurance lifting tests. Cardiorespiratory parameters were monitored with an oxygen uptake analyzer, mechanical parameters were calculated using a computerized dynamometer. Ratings of perceived exertion were given on Borg's 10-point scale. Physiological responses to repetitive lifting were matched with subjective perceptions. A single-variable statistical regression for power functions was performed to obtain the individual "iso-perception" curves as functions of the mechanical work exerted. We found that the "iso-perception" curve corresponding to a "moderate" perception of effort may represent the individual "tolerance threshold" for prolonged lifting tasks, since physiological responses at this level of intensity did not change significantly and the respiratory exchange ratio was less than one. The individually tolerable weight for lifting tasks lasting 30 min has been expressed as a percentage of the isoinertial MLC value and compared with the currently recommended limits for prolonged lifting tasks (Italian legislation D.L. 626/94). On the basis of our preliminary results a "tolerance threshold" of 20% MLC has been proposed for prolonged lifting tasks.

  17. 'A potential fifth column': conflicts and struggles for control in the context of local NHS privatization.

    PubMed

    Aldred, Rachel

    2009-09-01

    This article uses case study data to discuss how a new procurement policy (Local Improvement Finance Trust, or LIFT) in English primary care may affect general practitioners' control over their work. LIFT, a series of 51 public-private partnerships, will enable over the medium term a shift towards the corporate ownership of surgeries and the creation of polyclinics or 'onestop-shops'. In this article, I explore the struggles over work autonomy and control within these new LIFT structures, as expressed by clinicians and managers in meetings and in research interviews. More generally, I consider how the findings inform debates over the changing position of professionals within increasingly financialized 'local health economies'.

  18. Effect of training and lifting equipment for preventing back pain in lifting and handling: systematic review

    PubMed Central

    2008-01-01

    Objectives To determine whether advice and training on working techniques and lifting equipment prevent back pain in jobs that involve heavy lifting. Data sources Medline, Embase, CENTRAL, Cochrane Back Group’s specialised register, CINAHL, Nioshtic, CISdoc, Science Citation Index, and PsychLIT were searched up to September-November 2005. Review methods The primary search focused on randomised controlled trials and the secondary search on cohort studies with a concurrent control group. Interventions aimed to modify techniques for lifting and handling heavy objects or patients and including measurements for back pain, consequent disability, or sick leave as the main outcome were considered for the review. Two authors independently assessed eligibility of the studies and methodological quality of those included. For data synthesis, we summarised the results of studies comparing similar interventions. We used odds ratios and effect sizes to combine the results in a meta-analysis. Finally, we compared the conclusions of the primary and secondary analyses. Results Six randomised trials and five cohort studies met the inclusion criteria. Two randomised trials and all cohort studies were labelled as high quality. Eight studies looked at lifting and moving patients, and three studies were conducted among baggage handlers or postal workers. Those in control groups received no intervention or minimal training, physical exercise, or use of back belts. None of the comparisons in randomised trials (17 720 participants) yielded significant differences. In the secondary analysis, none of the cohort studies (772 participants) had significant results, which supports the results of the randomised trials. Conclusions There is no evidence to support use of advice or training in working techniques with or without lifting equipment for preventing back pain or consequent disability. The findings challenge current widespread practice of advising workers on correct lifting technique. PMID:18244957

  19. [Low back load reduction using mechanical lift during transfer of patients].

    PubMed

    Tomioka, Kimiko; Sakae, Kenichiro; Yasuda, Junko

    2008-07-01

    In Japanese care-work sites, care-workers (CWs) have lacked basic health risk awareness for transferring patients. Knowledge of lifting equipment and skills for transfer of patients have not been disseminated and many CWs have suffered from work-related musculoskeletal disorders, especially low back pain (LBP). In order to find better ways of patient transfer which reduce and prevent LBP, we conducted a study of low back loads and operation time during the transfer of a simulated patient, who was totally dependent from bed to wheelchair, using a mechanical lift (Lift) and manual handling (handling). Moreover we examined the levels of skill which CWs had acquired in transfer by Lift and the effects of acquired skill on low back loads and operation time. We explored low back load using surface electromyography (EMG) of the lumbar paraspinals between L3 and L4 and the trunk inclination angle (TIA) measurement method. The subjects were 5 caregivers who performed the task of transferring a simulated patient from lying on the bed to sitting in a wheelchair using the Lift and by handling. Handling transfer was assisted by two-persons at the head and foot. A 'simulated' patient (a 70 kg healthy male; instructed to keep whole body relaxed) was used in all transfer tasks. When subjects used the Lift, we made an ergonomics checklist for reduction of low back load of caregivers. Subjects performed the task 4 times and were evaluated with the checklist. The level of acquired skill was significantly improved by the guidance of the checklist. TIA was observed to be significantly lower in Lift than in handling, but with EMG no significant differences were seen between Lift and handling. The effects of acquired skill on low back loads showed that TIA was statistically reduced at high skill as compared to low skill. However, there were no significant differences between both skills in Lift and handling by EMG. Operation time of Lift showed significant shortening of operation time with high skill as compared to low skill. Operation time of Lift was about 10 times longer than handling. Thus, we suggest that transfer by Lift is a valid way of reducing the burden on CWs low back. Additionally, this study found that for reduction of LBP risk for CWs, it will be important not only to use the Lift but also to observe proper procedure and raise CW skill levels in patient transfer.

  20. The ergonomics body posture on repetitive and heavy lifting activities of workers in aerospace manufacturing warehouse

    NASA Astrophysics Data System (ADS)

    Kamat, S. R.; Zula, N. E. N. Md; Rayme, N. S.; Shamsuddin, S.; Husain, K.

    2017-06-01

    Warehouse is an important entity in manufacturing organizations. It usually involves working activities that relate ergonomics risk factors including repetitive and heavy lifting activities. Aerospace manufacturing workers are prone of having musculoskeletal disorder (MSD) problems because of the manual handling activities. From the questionnaires is states that the workers may have experience discomforts experience during manual handling work. Thus, the objectives of this study are; to investigate the body posture and analyze the level of discomfort for body posture of the workers while performing the repetitive and heavy lifting activities that cause MSD problems and to suggest proper body posture and alternatives to reduce the MSD related problems. Methodology of this study involves interviews, questionnaires distribution, anthropometry measurements, RULA (Right Upper Limb Assessment) assessment sheet and CATIA V5 RULA analysis, NIOSH lifting index (LI) and recommended weight limit (RWL). Ten workers are selected for pilot study and as for anthropometry measurement all workers in the warehouse department were involved. From the first pilot study, the RULA assessment score in CATIA V5 shows the highest score which is 7 for all postures and results after improvement of working posture is very low hence, detecting weight of the material handling is not in recommendation. To reduce the risk of MSD through the improvisation of working posture, the weight limit is also calculated in order to have a RWL for each worker. Therefore, proposing a guideline for the aerospace workers involved with repetitive movement and excessive lifting will help in reducing the risk of getting MSD.

  1. Texas passes first law for safe patient handling in America: landmark legislation protects health-care workers and patients from injury related to manual patient lifting.

    PubMed

    Hudson, Mary Anne

    2005-01-01

    On June 17,2005, Texas Governor Rick Perry (R) signed into law Senate Bill 1525, making Texas the first state in the nation to require hospitals and nursing homes to implement safe patient handling and movement programs. Governor Perry is to be commended for this heroic first stand for safe patient handling in America. The landmark legislation will take effect January 1, 2006, requiring the establishment of policy to identify, assess, and develop methods of controlling the risk of injury to patients and nurses associated with lifting, transferring, repositioning, and movement of patients; evaluation of alternative methods from manual lifting to reduce the risk of injury from patient lifting, including equipment and patient care environment; restricting, to the extent feasible with existing equipment, manual handling of all or most of a patient's weight to emergency, life-threatening, or exceptional circumstances; and provision for refusal to perform patient handling tasks believed to involve unacceptable risks of injury to a patient or nurse. Manually lifting patients has been called deplorable, inefficient, dangerous to nurses, and painful and brutal to patients; manual lifting can cause needless suffering and injury to patients, with dangers including pain, bruising, skin tears, abrasions, tube dislodgement, dislocations, fractures, and being dropped by nursing staff during attempts to manually lift. Use of safe, secure, mechanical lift equipment and gentle friction-reducing devices for patient maneuvering tasks could eliminate such needless brutality. Research has proven that manual patient lifting is extremely hazardous to health-care workers, creating substantial risk of low-back injury, whether with one or two patient handlers. Studies on the use of mechanical patient lift equipment, by either nursing staff or lift teams, have proven repeatedly that most nursing staff back injury is preventable, leading to substantial savings to employers on medical and compensation costs. Because the health-care industry has relied on people to do the work of machines, nursing work remains the most dangerous occupation for disabling back injury. Back injury from patient lifting may be the single largest contributor to the nursing shortage, with perhaps 12% of nurses leaving or being terminated because of back injury. The US health-care industry has not kept pace with other industries, which provide mechanical lift equipment for lifting loads equivalent to the weight of patients, or with other countries, such as Australia and England, which are more advanced in their use of modern technology for patient lifting and with no-lifting practices in compliance with government regulations and nursing policies banning manual lifting. With Texas being the first state to succeed in passing legislation for safe patient handling, other states are working toward legislative protection against injury with manual patient lifting. California re-introduced safe patient handling legislation on February 17, 2005, with CA SB 363, Hospitals: Lift Teams, following the September 22, 2004, veto of CA AB 2532 by Governor Arnold Schwarzenegger, who said he believes existing statutory protection and workplace safety standards are sufficient to protect health care workers from injury. Massachusetts HB 2662, Relating to Safe Patient Handling in Certain Health Facilities, was introduced December 1, 2004. Ohio HB 67, signed March 21, 2005 by Governor Bob Taft (R), creates a program for interest-free loans to nursing homes for implementation of a no-manual-lift program. New York companion bills AB 7641 and SB 4029 were introduced in April, 2005, calling for creation of a 2-year study to establish safe patient handling programs and collect data on nursing staff and patient injury with manual patient handling versus lift equipment, to determine best practices for improving health and safety of health-care workers and patients during patient handling. Washington State is planning re-introduction of safe patient handling legislation, after WA HB 1672, Relating to reducing injuries among patients and health care workers, was stalled in committee in February, 2005. Language from these state initiatives may be used as models to assist other states with drafting safe patient handling legislation. Rapid enactment of a federal mandate for Safe Patient Handling No Manual Lift is essential and anticipated.

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grogin, Phillip W.

    A powered industrial truck (PIT) is defined as a mobile, powerdriven vehicle used to carry, push, pull, lift, or stack material (not including vehicles intended primarily for earth moving). There are many types of and names for PITs, including forklifts, trucks, fork trucks, platform lift trucks, motorized hand trucks, and tractors. Although not every PIT is a forklift, because PITs are commonly called “forklifts,” this course manual generally uses the term “forklift,” although at times the terms “truck” and “PIT” are also used. In some areas of this course, you will see green boxes that refer to the Occupational Safetymore » and Health Administration (OSHA) regulation for PITs, which is 29 Code of Federal Regulations (CFR) 1910.178, Powered Industrial Trucks. The letter in the parentheses refers to the specific section of the regulation.« less

  3. KSC-05PD-1659

    NASA Technical Reports Server (NTRS)

    2005-01-01

    KENNEDY SPACE CENTER, FLA. In the transfer aisle of the Vehicle Assembly Building at NASA Kennedy Space Center, In the transfer aisle of the Vehicle Assembly Building at NASA Kennedy Space Center, orbiter technicians are hooking a restraining cable around the orbiter lifting slings aft drop leg adjustment hand wheel. This is performed prior to disconnecting the aft spreader beam from the sling (the portion suspended by the 175 ton crane on the left side of the photo), and also prior to taking the final hang angle measurement of the orbiter prior to lifting it over the transom into the high bay. It will be mated with the Solid Rocket Boosters and External Tank already stacked there on the Mobile Launcher Platform. Atlantis is the designated orbiter for Return to Flight mission STS-121. The lighted planning window for launch extends from Sept. 9 to Sept. 25.

  4. KSC-05PD-1660

    NASA Technical Reports Server (NTRS)

    2005-01-01

    KENNEDY SPACE CENTER, FLA. In the transfer aisle of the Vehicle Assembly Building at NASA Kennedy Space Center, In the transfer aisle of the Vehicle Assembly Building at NASA Kennedy Space Center, orbiter technicians are hooking a restraining cable around the orbiter lifting slings aft drop leg adjustment hand wheel. This is performed prior to disconnecting the aft spreader beam from the sling (the portion suspended by the 175 ton crane on the left side of the photo), and also prior to taking the final hang angle measurement of the orbiter prior to lifting it over the transom into the high bay. It will be mated with the Solid Rocket Boosters and External Tank already stacked there on the Mobile Launcher Platform. Atlantis is the designated orbiter for Return to Flight mission STS-121. The lighted planning window for launch extends from Sept. 9 to Sept. 25.

  5. A Cohort Study on Meniscal Lesions among Airport Baggage Handlers.

    PubMed

    Mikkelsen, Sigurd; Brauer, Charlotte; Pedersen, Ellen Bøtker; Alkjær, Tine; Koblauch, Henrik; Simonsen, Erik Bruun; Helweg-Larsen, Karin; Thygesen, Lau Caspar

    2016-01-01

    Meniscal lesions are common and may contribute to the development of knee arthrosis. A few case-control and cross-sectional studies have identified knee-straining work as risk factors for meniscal lesions, but exposure-response relations and the role of specific exposures are uncertain, and previous results may be sensitive to reporting and selection bias. We examined the relation between meniscal lesions and cumulative exposure to heavy lifting in a prospective register-based study with complete follow-up and independent information on exposure and outcome. We established a cohort of unskilled men employed at Copenhagen Airport or in other companies in the metropolitan Copenhagen area from 1990 to 2012 (the Copenhagen Airport Cohort). The cohort at risk included 3,307 airport baggage handlers with heavy lifting and kneeling or squatting work tasks and 63,934 referents with a similar socioeconomic background and less knee-straining work. Baggage handlers lifted suitcases with an average weight of approximately 15 kg, in total approximately five tonnes during a 9-hour workday. The cohort was followed in the National Patient Register and Civil Registration System. The outcome was a first time hospital diagnosis or surgery of a meniscal lesion. Baggage handlers had a higher incidence of meniscal lesions than the referents. Within baggage handlers spline regression showed that the incidence rate ratio was 1.91 (95% confidence interval: 1.29-2.84) after five years as a baggage handler and then decreased slowly to reach unity after approximately 30 years, adjusted for effects of potential confounders. This relation between baggage handling and meniscal lesions was present for work on the apron which involves lifting in a kneeling or squatting position, but not in the baggage hall, which only involves lifting in standing positions. The results support that long-term heavy lifting in a kneeling or squatting position is a risk factor for the development of symptomatic meniscal lesions.

  6. Lift-off process for fine-patterned PZT film using metal oxide as a sacrificial layer

    NASA Astrophysics Data System (ADS)

    Trong Tue, Phan; Shimoda, Tatsuya; Takamura, Yuzuru

    2017-01-01

    Patterning of lead zirconium titanate (PZT) films is crucial for highly integrated piezoelectric/ferroelectric micro-devices. In this work, we report a novel lift-off method using solution-processed indium zinc oxide (IZO) thin film as a sacrificial layer for sub-5 µm fine-patterning PZT film. The processes include IZO layer deposition and patterning, PZT film preparation, and final lift-off. The results reveal that the lift-off PZT processes provide better structural and electrical properties than those formed by the conventional wet-etching method. The successful patterning by the lift-off was mainly due to the fact that the IZO sacrificial layer is easy to etch and has a high-temperature resistance. This finding shows great promise for highly integrated electronic devices.

  7. Charlotte, N.C.'s Project L.I.F.T.: New Teaching Roles Create Culture of Excellence in High-Need Schools. An Opportunity Culture Case Study

    ERIC Educational Resources Information Center

    Han, Jiye Grace; Barrett, Sharon Kebschull

    2013-01-01

    This case study reports on the work of Denise Watts, who in 2011 was the newly named Project L.I.F.T. executive director and a Charlotte-Mecklenburg Schools zone superintendent. She approached Public Impact for help in meeting the new Project L.I.F.T. (Leadership and Investment for Transformation) goals. Facing urgent needs for real change, Watts…

  8. Numerical simulation of a powered-lift landing, tracking flow features using overset grids, and simulation of high lift devices on a fighter-lift-and-control wing

    NASA Technical Reports Server (NTRS)

    Chawla, Kalpana

    1993-01-01

    Attached as appendices to this report are documents describing work performed on the simulation of a landing powered-lift delta wing, the tracking of flow features using overset grids, and the simulation of flaps on the Wright Patterson Lab's fighter-lift-and-control (FLAC) wing. Numerical simulation of a powered-lift landing includes the computation of flow about a delta wing at four fixed heights as well as a simulated landing, in which the delta wing descends toward the ground. Comparison of computed and experimental lift coefficients indicates that the simulations capture the qualitative trends in lift-loss encountered by thrust-vectoring aircraft operating in ground effect. Power spectra of temporal variations of pressure indicate computed vortex shedding frequencies close to the jet exit are in the experimentally observed frequency range; the power spectra of pressure also provide insights into the mechanisms of lift oscillations. Also, a method for using overset grids to track dynamic flow features is described and the method is validated by tracking a moving shock and vortices shed behind a circular cylinder. Finally, Chimera gridding strategies were used to develop pressure coefficient contours for the FLAC wing for a Mach no. of 0.18 and Reynolds no. of 2.5 million.

  9. 2005 ACGIH Lifting TLV: Employee-Friendly Presentation and Guidance for Professional Judgment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Splittstoesser, Riley; O'Farrell, Daniel Edward; Hill, John

    The American Council of Governmental Industrial Hygienists (ACGIH) Lifting Threshold Limit Values (TLVs) provide a tool to reduce incidence of low back and shoulder injuries. However, application of the TLV is too complicated for floor-level workers and relies on professional judgment to assess commonly encountered tasks. This paper presents an Employee-Friendly Simplified Format of the TLV that has been adapted from Table 1 of the Lifting TLV presented in the 2005 TLVs and BEIs Based on the Documentation of the Threshold Limit Values for Chemical Substances and Physical Agents & Biological Exposure Indices. This simplified format can be employed bymore » floor-level workers to self-assess lifting tasks. The Ergonomics Project Team also provides research-based guidance for applying professional judgment consistent with standard industry practice: Extended Work Shifts – Reduce weight by 20% for shifts lasting 8 to 12 hours; Constrained Lower Body Posture – Reduce weight by 25% when lifting in such postures; Infrequently Performed Lifts – Lift up to 15 lbs. ≤3 lifts per hour within the zones marked “No safe limit for repetitive lifting” in the TLVs Table 1; Asymmetry beyond 30° – Reduce weight by 10 lbs. for lifts with up to 60° asymmetry from sagittal plane.« less

  10. Back Pain at Work: Preventing Pain and Injury

    MedlinePlus

    Healthy Lifestyle Adult health Heavy lifting, repetitive movements and sitting at a desk all day can take a toll on your back. Get the facts ... your back — such as by lifting or moving heavy objects — can cause injury. Repetition. Repeating certain movements, ...

  11. Modeling lift operations with SASmacr Simulation Studio

    NASA Astrophysics Data System (ADS)

    Kar, Leow Soo

    2016-10-01

    Lifts or elevators are an essential part of multistorey buildings which provide vertical transportation for its occupants. In large and high-rise apartment buildings, its occupants are permanent, while in buildings, like hospitals or office blocks, the occupants are temporary or users of the buildings. They come in to work or to visit, and thus, the population of such buildings are much higher than those in residential apartments. It is common these days that large office blocks or hospitals have at least 8 to 10 lifts serving its population. In order to optimize the level of service performance, different transportation schemes are devised to control the lift operations. For example, one lift may be assigned to solely service the even floors and another solely for the odd floors, etc. In this paper, a basic lift system is modelled using SAS Simulation Studio to study the effect of factors such as the number of floors, capacity of the lift car, arrival rate and exit rate of passengers at each floor, peak and off peak periods on the system performance. The simulation is applied to a real lift operation in Sunway College's North Building to validate the model.

  12. Analysis of the Effects of Streamwise Lift Distribution on Sonic Boom Signature

    NASA Technical Reports Server (NTRS)

    Yoo, Paul

    2013-01-01

    Investigation of sonic boom has been one of the major areas of study in aeronautics due to the benefits a low-boom aircraft has in both civilian and military applications. This work conducts a numerical analysis of the effects of streamwise lift distribution on the shock coalescence characteristics. A simple wing-canard-stabilator body model is used in the numerical simulation. The streamwise lift distribution is varied by fixing the canard at a deflection angle while trimming the aircraft with the wing and the stabilator at the desired lift coefficient. The lift and the pitching moment coefficients are computed using the Missile DATCOM v. 707. The flow field around the wing-canard- stabilator body model is resolved using the OVERFLOW-2 flow solver. Overset/ chimera grid topology is used to simplify the grid generation of various configurations representing different streamwise lift distributions. The numerical simulations are performed without viscosity unless it is required for numerical stability. All configurations are simulated at Mach 1.4, angle-of-attack of 1.50, lift coefficient of 0.05, and pitching moment coefficient of approximately 0. Four streamwise lift distribution configurations were tested.

  13. Working charts for the determination of the lift distribution between biplane wings

    NASA Technical Reports Server (NTRS)

    Kuhn, Paul

    1934-01-01

    In this report are presented empirical working charts from which the distribution of lift between wings, that is the fraction of the total lift borne by each, can be determined in the positive lift range for any ordinary biplane cellule whose individual wings have the same profile. The variables taken directly into account include airfoil section, stagger, gap/chord ratio, decalage, chord ratio, and overhang. It is shown that the influence of unequal sweepback and unequal dihedral in upper and lower wings may be properly provided for by utilizing the concepts of average stagger and average gap/chord ratio, respectively. The effect of other variables is discussed, but they have not been included in the charts either because their influence was obviously small or because insufficient data existed to make possible a complete determination of their influence. All available pertinent biplane data were analyzed in establishing the charts, and in some cases theoretical relationships were utilized to establish qualitative tendencies.

  14. KSC-2009-1397

    NASA Image and Video Library

    2009-01-28

    CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building's high bay 3 at NASA's Kennedy Space Center in Florida, framework is lifted to the 16th floor for modifications related to the Ares I-X. The refurbishment of the facility is for the Constellation Program's Ares vehicles. The Ares I and Ares V rockets will be 325 feet and 360 feet tall, respectively, considerably taller than the space shuttle atop its mobile launcher platform. Photo credit: NASA/Troy Cryder

  15. KSC-2009-1398

    NASA Image and Video Library

    2009-01-28

    CAPE CANAVERAL, Fla. –In the Vehicle Assembly Building's high bay 3 at NASA's Kennedy Space Center in Florida, framework is lifted to the 16th floor for modifications related to the Ares I-X. The refurbishment of the facility is for the Constellation Program's Ares vehicles. The Ares I and Ares V rockets will be 325 feet and 360 feet tall, respectively, considerably taller than the space shuttle atop its mobile launcher platform. Photo credit: NASA/Troy Cryder

  16. Collection and Analysis of Crowd Data with Aerial, Rooftop, and Ground Views

    DTIC Science & Technology

    2014-11-10

    collected these datasets using different aircrafts. Erista 8 HL OctaCopter is a heavy-lift aerial platform capable of using high-resolution cinema ...is another high-resolution camera that is cinema grade and high quality, with the capability of capturing videos with 4K resolution at 30 frames per...292.58 Imaging Systems and Accessories Blackmagic Production Camera 4 Crowd Counting using 4K Cameras High resolution cinema grade digital video

  17. WebBee: A Platform for Secure Coordination and Communication in Crisis Scenarios

    DTIC Science & Technology

    2008-04-16

    implemented through database triggers. The Webbee Database Server contains an Information Server, which is a Postgres database with PostGIS [5] extension...sends it to the target user. The heavy lifting for this mechanism is done through an extension of Postgres triggers (Figures 6.1 and 6.2), resulting...in fewer queries and better performance. Trigger support in Postgres is table-based and comparatively primitive: with n table triggers, an update

  18. How neotropical hummingbird versus bat species generate lift to hover

    NASA Astrophysics Data System (ADS)

    Ingersoll, Rivers; Lentink, David

    2017-11-01

    Both hummingbirds and nectar bats evolved the ability to hover in front of flowers providing them access to energy rich nectar. Hummingbirds have been found to generate more than a quarter of their weight support during the upstroke by inverting their wings-much more than generalist birds during slow hovering flight. In contrast to hummingbirds, bats have membrane wings which they partially fold during the upstroke. It has been hypothesized that bats generate some vertical lift force during the upstroke although the complex wake structures make it hard to quantify upstroke function through flow measurement. To compare the kinematics and aerodynamic forces generated by both groups, we caught and trained over 100 individuals spanning 18 hummingbird and 3 bat species in Coto Brus, Costa Rica. We used 3D calibrated high-speed cameras to measure wingbeat kinematics and a novel aerodynamic force platform to measure the instantaneous vertical lift force in vivo. This data gives us new insight into how ecology shapes the evolution of hovering flight across taxa in the same ecosystem. This research is supported by NSF CAREER Award 1552419 and the KACST Center of Excellence for Aeronautics and Astronautics at Stanford.

  19. Survey of lift-fan aerodynamic technology

    NASA Technical Reports Server (NTRS)

    Hickey, David H.; Kirk, Jerry V.

    1993-01-01

    Representatives of NASA Ames Research Center asked that a summary of technology appropriate for lift-fan powered short takeoff/vertical landing (STOVL) aircraft be prepared so that new programs could more easily benefit from past research efforts. This paper represents one of six prepared for that purpose. The authors have conducted or supervised the conduct of research on lift-fan powered STOVL designs and some of their important components for decades. This paper will first address aerodynamic modeling requirements for experimental programs to assure realistic, trustworthy results. It will next summarize the results or efforts to develop satisfactory specialized STOVL components such as inlets and flow deflectors. It will also discuss problems with operation near the ground, aerodynamics while under lift-fan power, and aerodynamic prediction techniques. Finally, results of studies to reduce lift-fan noise will be presented. The paper will emphasize results from large scale experiments, where available, for reasons that will be brought out in the discussion. Some work with lift-engine powered STOVL aircraft is also applicable to lift-fan technology and will be presented herein. Small-scale data will be used where necessary to fill gaps.

  20. A Molecular- and Nano-Electronics Test (MONET) platform fabricated using extreme ultraviolet lithography.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dentinger, Paul M.; Cardinale, Gregory F.; Hunter, Luke L.

    2003-12-01

    We describe the fabrication and characterization of an electrode array test structure, designed for electrical probing of molecules and nanocrystals. We use Extreme Ultraviolet Lithography (EUVL) to define the electrical test platform features. As fabricated, the platform includes nominal electrode gaps of 0 nm, 40 nm, 60 nm, and 80 nm. Additional variation in electrode gap is achieved by controlling the exposure conditions, such as dose and focus. To enable EUVL based nanofabrication, we develop a novel bi-level photoresist process. The bi-level photoresist consists of a combination of a commercially available polydimethylglutarimide (PMGI) bottom layer and an experimental EUVL photoresistmore » top (imaging) layer. We measure the sensitivity of PMGI to EUV exposure dose as a function of photoresist pre-bake temperature, and using this data, optimize a metal lift-off process. Reliable fabrication of 700 Angstrom thick Au structures with sub-1000 Angstrom critical dimensions is achieved, even without the use of a Au adhesion layer, such as Ti. Several test platforms are used to characterize electrical properties of organic molecules deposited as self assembled monolayers.« less

  1. Fundamentals and Methods of High Angle-of-Attack Flying Qualities Research

    DTIC Science & Technology

    1988-01-01

    the subject, Carr sites the work of Ham and Gorelick (1968) (Reference (26)) which showed that additional lift could be created by rapid pitching of...the laminar boundary layer near the leading-edge. Thicker airfoils (t/c > 0. 12), 32 NADC 88020-60 representative of figure 24b, typically create ...lift-curve can result from leading-edge flow separation as shown in figure 24a. An airplance with this type of lift-curve would exhibit little or no

  2. Space Shuttle and Launch Pad Lift-Off Debris Transport Analysis: SRB Plume-Driven

    NASA Technical Reports Server (NTRS)

    West, Jeff; Strutzenberg, Louis; Dougherty, Sam; Radke, Jerry; Liever, Peter

    2007-01-01

    This paper discusses the Space Shuttle Lift-Off model developed for potential Lift-Off Debris transport. A critical Lift-Off portion of the flight is defined from approximately 1.5 sec after SRB Ignition up to 'Tower Clear', where exhaust plume interactions with the Launch Pad occur. A CFD model containing the Space Shuttle and Launch Pad geometry has been constructed and executed. The CFD model works in conjunction with a debris particle transport model and a debris particle impact damage tolerance model. These models have been used to assess the effects of the Space Shuttle plumes, the wind environment, their interactions with the Launch Pad, and their ultimate effect on potential debris during Lift-Off. Emphasis in this paper is on potential debris that might be caught by the SRB plumes.

  3. Large-Vortex Capture by a Wing at Very High Angles of Attack

    NASA Technical Reports Server (NTRS)

    Wu, J. M.; Wu, J. Z.; Denny, G. A.; Lu, X. Y.

    1996-01-01

    In generating the lift on a wing, the static stall is a severe barrier. As the angle of attack, alpha, increases to the stall angle, alpha(sub stall) the flow separation point on the upper surface of the wing moves to the leading edge, so that on a two-dimensional airfoil or a large-aspect-ratio wing, the lift abruptly drops to a very low level. Therefore, the first generation of aeronautical flow type, i.e., the attached steady flow, has been limited to alpha less than alpha(sub stall). Owing to the obvious importance in applications, therefore, a great effort has been made in the past two decades to enlarge the range of usable angles of attack by various flow controls for a large-aspect-ratio wing. Basically, relevant works fall into two categories. The first category is usually refereed to as separation control, which concentrates on partially separated flow at alpha less than alpha(sub stall). Since the first experimental study of Collins and Zelenevitz, there has been ample literature showing that a partially separated flow can be turned to almost fully attached by flow controls, so that the lift is recovered and the stall is delayed (for a recent work see Seifert et al.). It has been well established that, in this category, unsteady controls are much more effective than steady ones and can be realized at a very low power-input level (Wu et al.; Seifert et al.). The second and more ambitious category of relevant efforts is the post-stall lift enhancement. Its possibility roots at the existence of a second lift peak at a very high angle of attack. In fact, As alpha further increases from alpha(sub stall), the completely separated flow develops and gradually becomes a bluff-body flow. This flow gives a normal force to the airfoil with a lift component, which reaches a peak at a maximum utilizable angle of attack, alpha(sub m) approx.= 40 deg. This second peak is of the same level as the first lift peak at alpha(sub stall). Meanwhile, the drag is also quickly increased (e.g., Fage and Johansen ; Critzos et al.). Figure 1 shows a typical experimental lift and drag coefficients of NACA-0012 airfoil in this whole range of angle of attack. Obviously, without overcoming the lift crisis at alpha(sub stall) the second lift peak is completely useless. Thus, the ultimate goal of post-stall lift enhancement is to fill the lift valley after stall by flow controls, so that a wing and/or flap can work at the whole range of 0 deg less than alpha less than alpha(sub m). Relevant early experimental studies have been extensively reviewed by Wu et al., who concluded that, first, similar to the leading-edge vortex on a slender wing, the lift enhancement on a large-aspect-ratio wing should be the result of capturing a vortex on the upper surface of the wing; and, second, using steady controls cannot reach the goal, and one must rely on unsteady controls with low-level power input as well. Wu et al. also conjectured that the underlying physics of post-stall lift enhancement by unsteady controls consists of a chain of mechanisms: vortex layer instability - receptivity resonance - nonlinear streaming.

  4. Reduction of Dynamic Loads in Mine Lifting Installations

    NASA Astrophysics Data System (ADS)

    Kuznetsov, N. K.; Eliseev, S. V.; Perelygina, A. Yu

    2018-01-01

    Article is devoted to a problem of decrease in the dynamic loadings arising in transitional operating modes of the mine lifting installations leading to heavy oscillating motions of lifting vessels and decrease in efficiency and reliability of work. The known methods and means of decrease in dynamic loadings and oscillating motions of the similar equipment are analysed. It is shown that an approach based on the concept of the inverse problems of dynamics can be effective method of the solution of this problem. The article describes the design model of a one-ended lifting installation in the form of a two-mass oscillation system, in which the inertial elements are the mass of the lifting vessel and the reduced mass of the engine, reducer, drum and pulley. The simplified mathematical model of this system and results of an efficiency research of an active way of reduction of dynamic loadings of lifting installation on the basis of the concept of the inverse problems of dynamics are given.

  5. Reliable fabrication of plasmonic nanostructures without an adhesion layer using dry lift-off

    NASA Astrophysics Data System (ADS)

    Chen, Yiqin; Li, Zhiqin; Xiang, Quan; Wang, Yasi; Zhang, Zhiqiang; Duan, Huigao

    2015-10-01

    Lift-off is the most commonly used pattern-transfer method to define lithographic plasmonic metal nanostructures. A typical lift-off process is realized by dissolving patterned resists in solutions, which has the limits of low yield when not using adhesion layers and incompatibility with the fabrication of some specific structures and devices. In this work, we report an alternative ‘dry’ lift-off process to obtain metallic nanostructures via mechanical stripping by using the advantage of poor adhesion between resists and noble metal films. We show that this dry stripping lift-off method is effective for both positive- and negative-tone resists to fabricate sparse and densely-packed plasmonic nanostructures, respectively. In particular, this method is achieved without using an adhesion layer, which enables the mitigation of plasmon damping to obtain larger field enhancement. Dark-field scattering, one-photon luminescence and surface-enhanced Raman scattering measurements were performed to demonstrate the improved quality factor of the plasmonic nanostructures fabricated by this dry lift-off process.

  6. Factors contributing to work related low back pain among personal care workers in old age.

    PubMed

    Yeung, Simon S

    2012-01-01

    This study aims to preliminary explore the work related and individual factors that contributed to the occurrence of low back pain (LBP) that affected work activities of Personal Care Workers (PCWs). A cross-sectional study was conducted to 36 PCWs in an old age home of Hong Kong. The study is divided into three parts: 1) a questionnaire to document the workload exposure factors and the musculoskeletal symptoms survey of the PCWs, 2) work posture evaluation; and 3) an evaluation of the physical fitness and lifting capacity of the PCWs. Univariate analyses were used to explore the risk factors associated with LBP that affected work activities. The results indicated that individual physical profile and lifting capacities did not contribute to occurrence of low back pain at work. For the work demand factors, the perceived physical demands in lifting and lowering heavy objects, awkward sustain neck and back postures, loading on the back, and perceived effort of cleaning task contributed to the occurrence of LBP. For the physical environment factors, thermal stress and improper ventilation were associated with the occurrence of LBP cases. For the individual factor, LBP cases were associated with workers' self perceived muscular effort, and perceived risk of mental illness in response to work requirements.

  7. Granular Material Scoop and Near-Vertical Lifting Feeder/Conveyor

    NASA Technical Reports Server (NTRS)

    Walton, Otis (Inventor); Vollmer, Hubert J. (Inventor)

    2017-01-01

    An integrated granular-material scoop and near-vertical lifting feeder/conveyor includes special connections and skirts between a bullnose rotating scoop and an open-helical screw that provides the rotations and material lift and evacuation. A conical working-face of the bullnose rotating scoop has symmetrically distributed graters and vents to break loose and force-in granular material from natural deposits and cargo holds. The bullnose rotating scoop and the open-helical screw its attached to move the material into a continuous layer on the inside surface of an outer stationary sheathing. A motor drive attached to the open-helical screw above at the delivery end provides the lifting force necessary.

  8. A virtual model of the bench press exercise.

    PubMed

    Rahmani, Abderrahmane; Rambaud, Olivier; Bourdin, Muriel; Mariot, Jean-Pierre

    2009-08-07

    The objective of this study was to design and validate a three degrees of freedom model in the sagittal plane for the bench press exercise. The mechanical model was based on rigid segments connected by revolute and prismatic pairs, which enabled a kinematic approach and global force estimation. The method requires only three simple measurements: (i) horizontal position of the hand (x(0)); (ii) vertical displacement of the barbell (Z) and (iii) elbow angle (theta). Eight adult male throwers performed maximal concentric bench press exercises against different masses. The kinematic results showed that the vertical displacement of each segment and the global centre of mass followed the vertical displacement of the lifted mass. Consequently, the vertical velocity and acceleration of the combined centre of mass and the lifted mass were identical. Finally, for each lifted mass, there were no practical differences between forces calculated from the bench press model and those simultaneously measured with a force platform. The error was lower than 2.5%. The validity of the mechanical method was also highlighted by a standard error of the estimate (SEE) ranging from 2.0 to 6.6N in absolute terms, a coefficient of variation (CV) < or =0.8%, and a correlation between the two scores > or =0.99 for all the lifts (p<0.001). The method described here, which is based on three simple parameters, allows accurate evaluation of the force developed by the upper limb muscles during bench press exercises in both field and laboratory conditions.

  9. KSC-05PD-1148

    NASA Technical Reports Server (NTRS)

    2005-01-01

    KENNEDY SPACE CENTER, FLA. Dwarfing the accompanying vehicles, Space Shuttle Discovery, resting on the Mobile Launcher Platform atop the Crawler/Transporter, heads along the crawlerway to the Vehicle Assembly Building (VAB). Discovery is rolling back from Launch Pad 39B (in the background). Once inside the VAB, Discovery will be demated from its External Tank and lifted into the transfer aisle. On or about June 7, Discovery will be lifted and attached to its new tank and Solid Rocket Boosters, which are already in the VAB. Only the 15th rollback in Space Shuttle Program history, the 4.2-mile journey allows additional modifications to be made to the External Tank prior to a safe Return to Flight. Discovery is expected to be rolled back to the launch pad in mid-June for Return to Flight mission STS-114. The launch window extends from July 13 to July 31.

  10. KSC-06pd2268

    NASA Image and Video Library

    2006-10-11

    KENNEDY SPACE CENTER, FLA. - Against a pre-dawn sky on Launch Pad 17-B at Cape Canaveral Air Force Station, the STEREO spacecraft is lifted up toward the platform on the mobile service tower. In the tower, STEREO will be mated with its launch vehicle, a Boeing Delta II rocket. STEREO stands for Solar Terrestrial Relations Observatory and comprises two spacecraft. The STEREO mission is the first to take measurements of the sun and solar wind in 3-dimension. This new view will improve our understanding of space weather and its impact on the Earth. The STEREO mission is managed by Goddard Space Flight Center. The Applied Physics Laboratory designed and built the spacecraft. The laboratory will maintain command and control of the observatories throughout the mission, while NASA tracks and receives the data, determines the orbit of the satellites, and coordinates the science results. STEREO is expected to lift off Oct. 25. Photo credit: NASA/George Shelton

  11. Space Shuttle Discovery lifts off successfully

    NASA Technical Reports Server (NTRS)

    1998-01-01

    Space Shuttle Discovery clears Launch Pad 39B at 2:19 p.m. EST Oct. 29 as it lifts off on mission STS-95. Making his second voyage into space after 36 years is Payload Specialist John H. Glenn Jr., senator from Ohio. Other crew members are Mission Commander Curtis L. Brown Jr., Pilot Steven W. Lindsey, Payload Specialist Chiaki Mukai, (M.D., Ph.D.), with the National Space Development Agency of Japan (NASDA), Mission Specialist Stephen K. Robinson, Mission Specialist Pedro Duque of Spain, representing the European Space Agency (ESA), and Mission Specialist Scott E. Parazynski. The STS-95 mission includes research payloads such as the Spartan solar-observing deployable spacecraft, the Hubble Space Telescope Orbital Systems Test Platform, the International Extreme Ultraviolet Hitchhiker, as well as the SPACEHAB single module with experiments on space flight and the aging process. Discovery is expected to return to KSC at 11:49 a.m. EST on Nov. 7.

  12. Work related musculoskeletal disorders amongst therapists in physically demanding roles: qualitative analysis of risk factors and strategies for prevention.

    PubMed

    Passier, Leanne; McPhail, Steven

    2011-01-25

    Physiotherapy and occupational therapy are two professions at high risk of work related musculoskeletal disorders (WRMD). This investigation aimed to identify risk factors for WRMD as perceived by the health professionals working in these roles (Aim 1), as well as current and future strategies they perceive will allow them to continue to work in physically demanding clinical roles (Aim 2). A two phase exploratory investigation was undertaken. The first phase included a survey administered via a web based platform with qualitative open response items. The second phase involved four focus group sessions which explored topics obtained from the survey. Thematic analysis of qualitative data from the survey and focus groups was undertaken. Overall 112 (34.3%) of invited health professionals completed the survey; 66 (58.9%) were physiotherapists and 46 (41.1%) were occupational therapists. Twenty-four health professionals participated in one of four focus groups. The risk factors most frequently perceived by health professionals included: work postures and movements, lifting or carrying, patient related factors and repetitive tasks. The six primary themes for strategies to allow therapists to continue to work in physically demanding clinical roles included: organisational strategies, workload or work allocation, work practices, work environment and equipment, physical condition and capacity, and education and training. Risk factors as well as current and potential strategies for reducing WRMD amongst these health professionals working in clinically demanding roles have been identified and discussed. Further investigation regarding the relative effectiveness of these strategies is warranted.

  13. Smart Rotorcraft Field Assistants for Terrestrial and Planetary Science

    NASA Technical Reports Server (NTRS)

    Young, Larry A.; Aiken, Edwin W.; Briggs, Geoffrey A.

    2004-01-01

    Field science in extreme terrestrial environments is often difficult and sometimes dangerous. Field seasons are also often short in duration. Robotic field assistants, particularly small highly mobile rotary-wing platforms, have the potential to significantly augment a field season's scientific return on investment for geology and astrobiology researchers by providing an entirely new suite of sophisticated field tools. Robotic rotorcraft and other vertical lift planetary aerial vehicle also hold promise for supporting planetary science missions.

  14. The Space Launch System and the Proving Ground: Pathways to Mars

    NASA Astrophysics Data System (ADS)

    Klaus, K.

    2014-12-01

    Introduction: The Space Launch System (SLS) is the most powerful rocket ever built and provides a critical heavy-lift launch capability. We present mission concepts relevant to NASA's Cislunar Proving Ground and the Global Exploration Roadmap (GER).Asteroid Redirect Mission (ARM): ARM in part is a mission to the lunar vicinity. The ARM mission requirements result in system design based on a modified version of our 702 spacecraft. Including a NASA Docking System (NDS) on the Asteroid Redirect Vehicle allows for easier crewed exploration integration and execution. Exploration Augmentation Module (EAM): Crew operations at a redirected asteroid could be significantly enhanced by providing additional systems and EVA capabilities beyond those available from the Orion only. An EAM located with the asteroid would improve the science and technical return of the asteroid mission while also increasing Orion capability through resource provision and providing an abort location and safe haven for contingencies. The EAM could be repurposed as a cislunar exploration platform that advances scientific research, enables lunar surface exploration and provides a deep space vehicle assembly and servicing site. International Space Station (ISS) industry partners have been working for the past several years on concepts for using ISS development methods and assets to support a broad range of missions. These concepts have matured along with planning details for NASA's SLS and Orion for a platform located in the Earth-Moon Libration (EML) system or Distant Retrograde Orbit (DRO).Lunar Surface: The mission objectives are to provide lunar surface access for crew and cargo and to provide as much reuse as possible. Subsequent missions to the surface can reuse the same lander and Lunar Transfer Vehicle.Mars Vicinity: The International space community has declared that our unified horizon goal is for a human mission to Mars. Translunar infrastructure and heavy lift capability are key to this approach. The moons of Mars would provide an excellent stepping stone to the surface. As a "shake-down" cruise before landing, a mission to Deimos or Phobos would test all of the systems except those needed to get to the surface and back. This test would provide confidence for the in-space transportations and crew habitat systems.

  15. Enhancing the capability of the research fleet.

    NASA Astrophysics Data System (ADS)

    Pinkel, R.

    2012-12-01

    While the performance and economics of our vessels and manned platforms are fixed by fundamental principles, their scientific capabilities can be considerably extended through the development of new technology. Potential future systems include multi-beam swath- mapping sonars for 3-D imaging of plankton patchiness, wire-guided profiling velocity sensors for establishing full-ocean-depth velocity profiles, shipboard HF radar (CODAR) for mapping energetic currents, and shipboard Doppler radar for mapping the surface wave spectrum. Research vessel users should have access to undersea gliders and autonomous aircraft as well as the current AUVs. In addition, the use of manned stable platforms in an observatory setting deserves further consideration. As well as providing an ideal mount for meteorological and oceanographic sensors, the platforms can provide electrical power and a "heavy lift" capability for sea floor and water column studies. Concerted community effort will be required to develop these new technologies, not all of which will be commercially viable. A strong academic technology base is necessary.

  16. Estimating lift from unsteady wakes by using the Kutta-Joukowski theorem with vorticity-weighted wake width

    NASA Astrophysics Data System (ADS)

    Wang, Shizhao; He, Guowei; Liu, Tianshu

    2017-11-01

    The Kutta-Joukowski (KJ) theorem usually leads to puzzling results when it is applied to estimating the lift from the unsteady wakes generated by flapping wings. We investigate this problem by using a prevalent flapping rectangular wing model, where the unsteady wakes are obtained by numerically solving the Navier-Stokes equations at a low Reynolds number. It is found that neither the unsteady nor the time-averaged lift coefficient is correctly predicted when the parameters for the KJ theorem are selected according to the widely accepted ways in the literature. We propose a vorticity-weighted wake width model based on the vortex impulse theory to improve the prediction of the time-averaged lift. Furthermore, we investigate the phase difference of unsteady lift caused by the quasi-steady assumption of the application of the KJ theorem to the flapping flight and quantitatively link the phase difference to the local fluid acceleration. We show the phase difference can be corrected by using an added mass lift model. This work is helpful to clarify the error in estimating the lift of animal flight. Supported by the National Natural Science Foundation of China (No. 11672305).

  17. Progress on Enabling Unprecedented Payloads for Space in the 21st Century

    NASA Technical Reports Server (NTRS)

    Creech, Steve

    2010-01-01

    The NASA Ares Projects Office is developing the launch vehicles to move the United States and humanity beyond low earth orbit. Ares V is a heavy lift vehicle being designed to launch cargo into LEO and transfer cargo and crews to the Moon. Heavy Lift is a national asset with applications to science, business, and national defense. This is a snapshot of development. Ares V is early in the requirements formulation stage of development pending White House and Congressional deliberations. Work date will be useful to any future heavy lift development.

  18. GSDO Crawler Tread Removal

    NASA Image and Video Library

    2014-03-28

    CAPE CANAVERAL, Fla. – Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, ground support technicians attach crane lines to the treads on the C truck of crawler-transporter 2, or CT-2, so they can be lifted up and away. The treads are being removed in order to gain access to remove the gear boxes. Work continues in high bay 2 to upgrade CT-2. The modifications are designed to ensure CT-2’s ability to transport launch vehicles currently in development, such as the agency’s Space Launch System, to the launch pad. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. For more information, visit: http://www.nasa.gov/exploration/systems/ground/crawler-transporter. Photo credit: NASA/Dimitri Gerondidakis

  19. Mounted Video Camera Captures Launch of STS-112, Shuttle Orbiter Atlantis

    NASA Technical Reports Server (NTRS)

    2002-01-01

    A color video camera mounted to the top of the External Tank (ET) provided this spectacular never-before-seen view of the STS-112 mission as the Space Shuttle Orbiter Atlantis lifted off in the afternoon of October 7, 2002, The camera provided views as the the orbiter began its ascent until it reached near-orbital speed, about 56 miles above the Earth, including a view of the front and belly of the orbiter, a portion of the Solid Rocket Booster, and ET. The video was downlinked during flight to several NASA data-receiving sites, offering the STS-112 team an opportunity to monitor the shuttle's performance from a new angle. Atlantis carried the S1 Integrated Truss Structure and the Crew and Equipment Translation Aid (CETA) Cart. The CETA is the first of two human-powered carts that will ride along the International Space Station's railway providing a mobile work platform for future extravehicular activities by astronauts. Landing on October 18, 2002, the Orbiter Atlantis ended its 11-day mission.

  20. Mounted Video Camera Captures Launch of STS-112, Shuttle Orbiter Atlantis

    NASA Technical Reports Server (NTRS)

    2002-01-01

    A color video camera mounted to the top of the External Tank (ET) provided this spectacular never-before-seen view of the STS-112 mission as the Space Shuttle Orbiter Atlantis lifted off in the afternoon of October 7, 2002. The camera provided views as the orbiter began its ascent until it reached near-orbital speed, about 56 miles above the Earth, including a view of the front and belly of the orbiter, a portion of the Solid Rocket Booster, and ET. The video was downlinked during flight to several NASA data-receiving sites, offering the STS-112 team an opportunity to monitor the shuttle's performance from a new angle. Atlantis carried the S1 Integrated Truss Structure and the Crew and Equipment Translation Aid (CETA) Cart. The CETA is the first of two human-powered carts that will ride along the International Space Station's railway providing a mobile work platform for future extravehicular activities by astronauts. Landing on October 18, 2002, the Orbiter Atlantis ended its 11-day mission.

  1. Work-related lesions of the supraspinatus tendon: a case-control study.

    PubMed

    Seidler, Andreas; Bolm-Audorff, Ulrich; Petereit-Haack, Gabriela; Ball, Elke; Klupp, Magdalena; Krauss, Noëlle; Elsner, Gine

    2011-04-01

    To examine the dose-response relationship between cumulative duration of work with highly elevated arms (work above shoulder level) as well as of manual material handling and ruptures of the supraspinatus tendon in a population-based case-control study. In 14 radiologic practices, we recruited 483 male patients aged 25-65 with radiographically confirmed partial (n = 385) or total (n = 98) supraspinatus tears associated with shoulder pain. A total of 300 male control subjects were recruited. Data were gathered in a structured personal interview. To calculate cumulative exposure, the self-reported duration of lifting/carrying of heavy loads (>20 kg) as well as the duration of work with highly elevated arms was added up over the entire working life. The results of our study support a dose-response relationship between cumulative duration of work with highly elevated arms and symptomatic supraspinatus tendon tears. For a cumulative duration of >3,195 h work above shoulder level, the risk of a supraspinatus tendon rupture is elevated to 2.0 (95% CI 1.1-3.5), adjusted for age, region, lifting/carrying of heavy loads, handheld vibration, apparatus gymnastics/shot put/javelin/hammer throwing/wrestling, and tennis. The cumulative duration of carrying/lifting of heavy loads also yields a positive dose-response relation with disease (independent from work above shoulder level and from handheld vibration), with an adjusted odds ratio of 1.8 (95% CI 1.0-3.2) in the highest exposure category (>77 h). We find an increased risk for subjects exposed to handheld vibration with an adjusted OR of 3.2 (95% CI 1.7-5.9) in the highest exposure category (16 years or more in the job with exposure), but a clear dose-response relationship is lacking. This study points to a potential etiologic role of long-term cumulative effects of work with highly elevated arms and heavy lifting/carrying on shoulder tendon disorders.

  2. 49 CFR 38.23 - Mobility aid accessibility.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....g., lift or ramp) complying with paragraph (b) or (c) of this section and sufficient clearances to... this section, shall be provided on vehicles 22 feet in length or less. (b) Vehicle lift—(1) Design load. The design load of the lift shall be at least 600 pounds. Working parts, such as cables, pulleys, and...

  3. 49 CFR 38.23 - Mobility aid accessibility.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ....g., lift or ramp) complying with paragraph (b) or (c) of this section and sufficient clearances to... this section, shall be provided on vehicles 22 feet in length or less. (b) Vehicle lift—(1) Design load. The design load of the lift shall be at least 600 pounds. Working parts, such as cables, pulleys, and...

  4. Is Borg's perceived exertion scale a useful indicator of muscular and cardiovascular load in blue-collar workers with lifting tasks? A cross-sectional workplace study.

    PubMed

    Jakobsen, Markus Due; Sundstrup, Emil; Persson, Roger; Andersen, Christoffer H; Andersen, Lars L

    2014-02-01

    To investigate associations between perceived exertion and objectively assessed muscular and cardiovascular load during a full working day among workers with manual lifting tasks. A total of 159 men and 41 women from 14 workplaces with manual lifting tasks participated. Participants reported perceived exertion (BORG-CR10) at midday and after work. Surface electromyography of the thigh, lower back and neck muscles were normalized to isometric voluntary contractions (MVC) to express relative muscle load during the day. Cardiovascular load was measured with electrocardiography and calculated as the average percentage of the heart rate reserve capacity (((heart rate during work - resting heart rate) / (maximum heart rate - resting heart rate)) * 100) during the day. Using linear regression, significant but weak associations (β < 0.23) were observed between perceived exertion and (1) high muscle activity (>60% of MVC) of the neck muscles and (2) inactivity (<1% of MVC) of the thigh muscles and (3) cardiovascular load, respectively. Using logistic regression, perceived exertion ≥4 (high exertion), referencing <4 (low-to-moderate exertion), was related to high activity of the trapezius muscle [OR 18 (95% CI 2-143)], i.e., the odds for experiencing high exertion during work increased 18-fold for each percentage increase in time above 60% MVC. During a full working day among blue-collar workers with lifting tasks, high neck muscle activity increases the odds for experiencing high perceived physical exertion. Perceived exertion of at least 4 on the BORG CR10 scale appears to be a good indicator that high muscular loading occurs.

  5. AORN Ergonomic Tool 3: lifting and holding the patient's legs, arms, and head while prepping.

    PubMed

    Waters, Thomas; Spera, Patrice; Petersen, Carol; Nelson, Audrey; Hernandez, Edward; Applegarth, Shawn

    2011-05-01

    Lifting the arms, legs, or head of a patient while prepping these areas for surgery can exert strong forces on the muscles and joints of the shoulders and backs of perioperative team members who perform this task, which may lead to work-related musculoskeletal disorders. AORN Ergonomic Tool 3: Lifting and Holding the Patient's Legs, Arms, and Head While Prepping provides scientifically based determinations of the amount of weight perioperative personnel can safely lift and hold manually for up to one, two, and three minutes using one hand or both. If these weight limits are exceeded, additional staff members or assistive devices are needed to help with the task. Published by Elsevier Inc.

  6. Effects of work experience on fatigue-induced biomechanical changes during repetitive asymmetric lifts/lowers.

    PubMed

    Lee, Jungyong; Nussbaum, Maury A; Kyung, Gyouhyung

    2014-01-01

    Repetitive lifting/lowering is associated with an increased risk of work-related low back disorders (WRLBDs), and fatigue may exacerbate such risk. Work methods used by experienced workers are potential models for developing worker training to reduce WRLBDs, though whether experience modifies the effects of fatigue on WRLBD risk is largely unknown. Here, six novices and six experienced workers completed 185 cycles of repetitive, asymmetric lifts/lowers. Physical demands, whole-body balance and torso movement stability were assessed using torso kinematics/kinetics, linear/angular momenta and Lyapunov exponents, respectively. Several fatigue-induced changes in movement strategies were evident. Novices decreased and experienced workers increased peak lumbar moments post-fatigue, suggesting lower WRLBD risks among the former in terms of torso kinetics. Other than lumbar moments, though, fatigue substantially reduced group-level differences in torso twisting velocities and accelerations. Post-fatigue movement strategies of experienced workers thus did not appear to be advantageous in terms of WRLBD risk.

  7. System technology analysis of aeroassisted orbital transfer vehicles: Moderate lift/drag (0.75-1.5). Volume 3: Cost estimates and work breakdown structure/dictionary, phase 1 and 2

    NASA Technical Reports Server (NTRS)

    1985-01-01

    Technology payoffs of representative ground based (Phase 1) and space based (Phase 2) mid lift/drag ratio aeroassisted orbit transfer vehicles (AOTV) were assessed and prioritized. A narrative summary of the cost estimates and work breakdown structure/dictionary for both study phases is presented. Costs were estimated using the Grumman Space Programs Algorithm for Cost Estimating (SPACE) computer program and results are given for four AOTV configurations. The work breakdown structure follows the standard of the joint government/industry Space Systems Cost Analysis Group (SSCAG). A table is provided which shows cost estimates for each work breakdown structure element.

  8. STS-95 Space Shuttle Discovery rollout to Launch Pad 39B

    NASA Technical Reports Server (NTRS)

    1998-01-01

    As daylight creeps over the horizon, STS-95 Space Shuttle Discovery, on the Mobile Launch Platform, arrives at Launch Complex Pad 39B after a 4.2-mile trip taking approximately 6 hours. At the left is the 'white room,' attached to the orbiter access arm. The white room is an environmental chamber that mates with the orbiter and holds six persons. At the launch pad, the orbiter, external tank and solid rocket boosters will undergo final preparations for the launch, scheduled to lift off Oct. 29. The mission includes research payloads such as the Spartan solar- observing deployable spacecraft, the Hubble Space Telescope Orbital Systems Test Platform, the International Extreme Ultraviolet Hitchhiker, as well as the SPACEHAB single module with experiments on space flight and the aging process.

  9. KSC-98pc1179

    NASA Image and Video Library

    1998-09-28

    KENNEDY SPACE CENTER, FLA. -- At left, the payload canister for Space Shuttle Discovery is lifted from its canister movement vehicle to the top of the Rotating Service Structure on Launch Pad 39-B. Discovery (right), sitting atop the Mobile Launch Platform and next to the Fixed Service Structure (FSS), is scheduled for launch on Oct. 29, 1998, for the STS-95 mission. That mission includes the International Extreme Ultraviolet Hitchhiker (IEH-3), the Hubble Space Telescope Orbital Systems Test Platform, the Spartan solar-observing deployable spacecraft, and the SPACEHAB single module with experiments on space flight and the aging process. At the top of the FSS can be seen the 80-foot lightning mast . The 4-foot-high lightning rod on top helps prevent lightning current from passing directly through the Space Shuttle and the structures on the pad

  10. External Hand Forces Exerted by Long-Term Care Staff to Push Floor-Based Lifts: Effects of Flooring System and Resident Weight.

    PubMed

    Lachance, Chantelle C; Korall, Alexandra M B; Russell, Colin M; Feldman, Fabio; Robinovitch, Stephen N; Mackey, Dawn C

    2016-09-01

    The aim of this study was to investigate the effects of flooring type and resident weight on external hand forces required to push floor-based lifts in long-term care (LTC). Novel compliant flooring is designed to reduce fall-related injuries among LTC residents but may increase forces required for staff to perform pushing tasks. A motorized lift may offset the effect of flooring on push forces. Fourteen female LTC staff performed straight-line pushes with two floor-based lifts (conventional, motor driven) loaded with passengers of average and 90th-percentile resident weights over four flooring systems (concrete+vinyl, compliant+vinyl, concrete+carpet, compliant+carpet). Initial and sustained push forces were measured by a handlebar-mounted triaxial load cell and compared to participant-specific tolerance limits. Participants rated pushing difficulty. Novel compliant flooring increased initial and sustained push forces and subjective ratings compared to concrete flooring. Compared to the conventional lift, the motor-driven lift substantially reduced initial and sustained push forces and perceived difficulty of pushing for all four floors and both resident weights. Participants exerted forces above published tolerance limits only when using the conventional lift on the carpet conditions (concrete+carpet, compliant+carpet). With the motor-driven lift only, resident weight did not affect push forces. Novel compliant flooring increased linear push forces generated by LTC staff using floor-based lifts, but forces did not exceed tolerance limits when pushing over compliant+vinyl. The motor-driven lift substantially reduced push forces compared to the conventional lift. Results may help to address risk of work-related musculoskeletal injury, especially in locations with novel compliant flooring. © 2016, Human Factors and Ergonomics Society.

  11. Samus Counter Lifting Fixture

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stredde, H.; /Fermilab

    1998-05-27

    A lifting fixture has been designed to handle the Samus counters. These counters are being removed from the D-zero area and will be transported off site for further use at another facility. This fixture is designed specifically for this particular application and will be transferred along with the counters. The future use of these counters may entail installation at a facility without access to a crane and therefore a lift fixture suitable for both crane and/or fork lift usage has been created The counters weigh approximately 3000 lbs. and have threaded rods extended through the counter at the top comersmore » for lifting. When these counters were first handled/installed these rods were used in conjunction with appropriate slings and handled by crane. The rods are secured with nuts tightened against the face of the counter. The rod thread is M16 x 2({approx}.625-inch dia.) and extends 2-inch (on average) from the face of the counter. It is this cantilevered rod that the lift fixture engages with 'C' style plates at the four top comers. The strongback portion of the lift fixture is a steel rectangular tube 8-inch (vertical) x 4-inch x .25-inch wall, 130-inch long. 1.5-inch square bars are welded perpendicular to the long axis of the rectangular tube at the appropriate lift points and the 'C' plates are fastened to these bars with 3/4-10 high strength bolts -grade 8. Two short channel sections are positioned-welded-to the bottom of the rectangular tube on 40 feet centers, which are used as locators for fork lift tines. On the top are lifting eyes for sling/crane usage and are rated at 3500 lbs. safe working load each - vertical lift only.« less

  12. Musculoskeletal injuries among hospital patient care staff before and after implementation of patient lift and transfer equipment.

    PubMed

    Schoenfisch, Ashley L; Lipscomb, Hester J; Pompeii, Lisa A; Myers, Douglas J; Dement, John M

    2013-01-01

    Using an observational research design and robust surveillance data, we evaluated rates of musculoskeletal (MS) injuries, days away from work, and restricted work days among patient care staff at a medical center and community hospital in the United States over 13 years, during which time a "minimal manual lift" policy and mechanical lift equipment were implemented. Workers' compensation claims data were linked to human resources data to define outcomes of interest and person-time at risk to calculate rates. Poisson and negative binomial regression with lagging were used to compare outcome rates in different windows of time surrounding the intervention. Patterns of MS injuries associated with patient-handling were contrasted to patterns of other MS injuries that would not be affected by the use of mechanical lift equipment. At the medical center, no change in the patient-handling MS injury rate followed the intervention. A 44% decrease was observed at the community hospital. At both hospitals, the rate of days away declined immediately - before it was reasonable for the intervention to have been adopted. Institutional-level changes at the time of the intervention likely influenced observed results with findings only partially consistent with an intervention effect. Observational studies can be useful in assessing effectiveness of safety interventions in complex work environments. Such studies should consider the process of intervention implementation, the time needed for intervention adoption, and the dynamic nature of work environments.

  13. Low back pain among mineworkers in relation to driving, cold environment and ergonomics.

    PubMed

    Skandfer, Morten; Talykova, Ljudmila; Brenn, Tormod; Nilsson, Tohr; Vaktskjold, Arild

    2014-01-01

    We aimed to study the association between low back pain (LBP) and exposure to low temperature, wet clothes, heavy lifting and jobs that involve whole body vibration (WBV) in a population of miners. Health and personal data were collected in a population study by a questionnaire. A total of 3530 workers from four mines participated in the study. 51% of the workers reported LBP within the last 12 months. The adjusted odds ratio for LBP was above unity for working with wet clothes (1.82), working in cold conditions (1.52), lifting heavy (1.54), having worked as a driver previously (1.79) and driving Toro400 (2.61) or train (1.69). Wet clothing, cold working conditions, heavy lifting, previous work as a driver and driving certain vehicles were associated with LBP, but vehicles with WBV levels above action value were not. For better prevention of LBP, improved cabin conditions and clothing should be emphasised. To address risk factors for low back pain (LBP) in miners, a population study measured exposures and LBP. Cold work conditions, wet clothes and awkward postures appeared to be more strongly associated with LBP than exposure to whole body vibration from driving heavy vehicles. Prevention strategies must focus more on clothing and ergonomics.

  14. Light aircraft lift, drag, and moment prediction: A review and analysis

    NASA Technical Reports Server (NTRS)

    Smetana, F. O.; Summey, D. C.; Smith, N. S.; Carden, R. K.

    1975-01-01

    The historical development of analytical methods for predicting the lift, drag, and pitching moment of complete light aircraft configurations in cruising flight is reviewed. Theoretical methods, based in part on techniques described in the literature and in part on original work, are developed. These methods form the basis for understanding the computer programs given to: (1) compute the lift, drag, and moment of conventional airfoils, (2) extend these two-dimensional characteristics to three dimensions for moderate-to-high aspect ratio unswept wings, (3) plot complete configurations, (4) convert the fuselage geometric data to the correct input format, (5) compute the fuselage lift and drag, (6) compute the lift and moment of symmetrical airfoils to M = 1.0 by a simplified semi-empirical procedure, and (7) compute, in closed form, the pressure distribution over a prolate spheroid at alpha = 0. Comparisons of the predictions with experiment indicate excellent lift and drag agreement for conventional airfoils and wings. Limited comparisons of body-alone drag characteristics yield reasonable agreement. Also included are discussions for interference effects and techniques for summing the results above to obtain predictions for complete configurations.

  15. STS-106 orbiter Atlantis rolls over to the VAB

    NASA Technical Reports Server (NTRS)

    2000-01-01

    The orbiter Atlantis is moved aboard an orbiter transporter from the Orbiter Processing Facility (OPF) bay 3 over to the Vehicle Assembly Building (VAB). In the background (right) are OPF bays 1 and 2. In the VAB it will be lifted to vertical and placed aboard the mobile launcher platform (MLP) for stacking with the solid rocket boosters and external tank. Atlantis is scheduled to launch Sept. 8 on mission STS-106, the fourth construction flight to the International Space Station, with a crew of seven.

  16. KSC-02pd1285

    NASA Image and Video Library

    2002-09-05

    KENNEDY SPACE CENTER, FLA. -- After lifting to vertical, the orbiter Atlantis is moved toward the solid rocket booster and external tank below, on top of the Mobile Launcher Platform, for mating before rollout to the launch pad for mission STS-112. Launch is scheduled no earlier than Oct. 2 for the 15th assembly flight to the International Space Station. Atlantis will carry the S1 Integrated Truss Structure, which will be attached to the central truss segment, the S0 truss, during the mission.

  17. KSC-2009-1396

    NASA Image and Video Library

    2009-01-28

    CAPE CANAVERAL, Fla. – Framework is being lifted from a transporter to be installed on the 16th floor for modifications in the Vehicle Assembly Building's high bay 3 at NASA's Kennedy Space Center in Florida related to the Ares I-X. The refurbishment of the facility is for the Constellation Program's Ares vehicles. The Ares I and Ares V rockets will be 325 feet and 360 feet tall, respectively, considerably taller than the space shuttle atop its mobile launcher platform. Photo credit: NASA/Troy Cryder

  18. STS-106 orbiter Atlantis rolls over to the VAB

    NASA Technical Reports Server (NTRS)

    2000-01-01

    KSC employees accompany the orbiter Atlantis as it is moved aboard an orbiter transporter to the Vehicle Assembly Building (VAB). In the background are OPF bays 1 and 2. In the VAB it will be lifted to vertical and placed aboard the mobile launcher platform (MLP) for stacking with the solid rocket boosters and external tank. Atlantis is scheduled to launch Sept. 8 on mission STS-106, the fourth construction flight to the International Space Station, with a crew of seven.

  19. STS-106 orbiter Atlantis rolls over to the VAB

    NASA Technical Reports Server (NTRS)

    2000-01-01

    Viewed from an upper level in the Vehicle Assembly Building (VAB), the orbiter Atlantis waits in the transfer aisle after its move from the Orbiter Processing Facility. In the VAB it will be lifted to vertical and placed aboard the mobile launcher platform (MLP) for stacking with the solid rocket boosters and external tank. Atlantis is scheduled to launch Sept. 8 on mission STS-106, the fourth construction flight to the International Space Station, with a crew of seven.

  20. Training Management in the CH-46E Community After MAWTS-1 Stands Down Its CH-46E Division

    DTIC Science & Technology

    2012-04-23

    SHOULD INCLUDE THE FOREGOING STATEMENT. QUOTATION FROM, ABSTRACTION FROM, OR REPRODUCTION OF ALL OR ANY PART OF THIS DOCUMENT IS PERMITTED...HMH) currently fly either the CH-53D Sea Stallion or the CH-53E Super Stallion helicopters. Those units that fly the CH-53D Sea Stallion are in the...process of converting to the CH-53E Super Stallion or will transition the squadrons to medium lift assault support platforms.5 The HMHs currently

  1. Additive and Photochemical Manufacturing of Copper

    PubMed Central

    Yung, Winco K. C.; Sun, Bo; Meng, Zhengong; Huang, Junfeng; Jin, Yingdi; Choy, Hang Shan; Cai, Zhixiang; Li, Guijun; Ho, Cheuk Lam; Yang, Jinlong; Wong, Wai Yeung

    2016-01-01

    In recent years, 3D printing technologies have been extensively developed, enabling rapid prototyping from a conceptual design to an actual product. However, additive manufacturing of metals in the existing technologies is still cost-intensive and time-consuming. Herein a novel platform for low-cost additive manufacturing is introduced by simultaneously combining the laser-induced forward transfer (LIFT) method with photochemical reaction. Using acrylonitrile butadiene styrene (ABS) polymer as the sacrificial layer, sufficient ejection momentum can be generated in the LIFT method. A low-cost continuous wave (CW) laser diode at 405 nm was utilized and proved to be able to transfer the photochemically synthesized copper onto the target substrate. The wavelength-dependent photochemical behaviour in the LIFT method was verified and characterized by both theoretical and experimental studies compared to 1064 nm fiber laser. The conductivity of the synthesized copper patterns could be enhanced using post electroless plating while retaining the designed pattern shapes. Prototypes of electronic circuits were accordingly built and demonstrated for powering up LEDs. Apart from pristine PDMS materials with low surface energies, the proposed method can simultaneously perform laser-induced forward transfer and photochemical synthesis of metals, starting from their metal oxide forms, onto various target substrates such as polyimide, glass and thermoplastics. PMID:28000733

  2. Additive and Photochemical Manufacturing of Copper

    NASA Astrophysics Data System (ADS)

    Yung, Winco K. C.; Sun, Bo; Meng, Zhengong; Huang, Junfeng; Jin, Yingdi; Choy, Hang Shan; Cai, Zhixiang; Li, Guijun; Ho, Cheuk Lam; Yang, Jinlong; Wong, Wai Yeung

    2016-12-01

    In recent years, 3D printing technologies have been extensively developed, enabling rapid prototyping from a conceptual design to an actual product. However, additive manufacturing of metals in the existing technologies is still cost-intensive and time-consuming. Herein a novel platform for low-cost additive manufacturing is introduced by simultaneously combining the laser-induced forward transfer (LIFT) method with photochemical reaction. Using acrylonitrile butadiene styrene (ABS) polymer as the sacrificial layer, sufficient ejection momentum can be generated in the LIFT method. A low-cost continuous wave (CW) laser diode at 405 nm was utilized and proved to be able to transfer the photochemically synthesized copper onto the target substrate. The wavelength-dependent photochemical behaviour in the LIFT method was verified and characterized by both theoretical and experimental studies compared to 1064 nm fiber laser. The conductivity of the synthesized copper patterns could be enhanced using post electroless plating while retaining the designed pattern shapes. Prototypes of electronic circuits were accordingly built and demonstrated for powering up LEDs. Apart from pristine PDMS materials with low surface energies, the proposed method can simultaneously perform laser-induced forward transfer and photochemical synthesis of metals, starting from their metal oxide forms, onto various target substrates such as polyimide, glass and thermoplastics.

  3. The role of cumulative physical work load in symptomatic knee osteoarthritis – a case-control study in Germany

    PubMed Central

    Seidler, Andreas; Bolm-Audorff, Ulrich; Abolmaali, Nasreddin; Elsner, Gine

    2008-01-01

    Objectives To examine the dose-response relationship between cumulative exposure to kneeling and squatting as well as to lifting and carrying of loads and symptomatic knee osteoarthritis (OA) in a population-based case-control study. Methods In five orthopedic clinics and five practices we recruited 295 male patients aged 25 to 70 with radiographically confirmed knee osteoarthritis associated with chronic complaints. A total of 327 male control subjects were recruited. Data were gathered in a structured personal interview. To calculate cumulative exposure, the self-reported duration of kneeling and squatting as well as the duration of lifting and carrying of loads were summed up over the entire working life. Results The results of our study support a dose-response relationship between kneeling/squatting and symptomatic knee osteoarthritis. For a cumulative exposure to kneeling and squatting > 10.800 hours, the risk of having radiographically confirmed knee osteoarthritis as measured by the odds ratio (adjusted for age, region, weight, jogging/athletics, and lifting or carrying of loads) is 2.4 (95% CI 1.1–5.0) compared to unexposed subjects. Lifting and carrying of loads is significantly associated with knee osteoarthritis independent of kneeling or similar activities. Conclusion As the knee osteoarthritis risk is strongly elevated in occupations that involve both kneeling/squatting and heavy lifting/carrying, preventive efforts should particularly focus on these "high-risk occupations". PMID:18625053

  4. Chemical enhancement of footwear impressions in blood deposited on fabric--evaluating the use of alginate casting materials followed by chemical enhancement.

    PubMed

    Farrugia, Kevin J; NicDaéid, Niamh; Savage, Kathleen A; Bandey, Helen

    2010-12-01

    Most footwear marks made in blood on a surface such as fabric tend to be enhanced in situ rather than physically recovered using a lifting technique prior to enhancement. This work reports on the use of an alginate material to recover the impressed footwear marks made in blood and deposited on a range of fabric types and colours. The lifted marks were then enhanced using acid black 1 and leuco crystal violet with excellent results. This presents a new method for the lifting and recovery of blood impressions in situ from crime scene followed by subsequent mark enhancement of the lifted impression. Copyright © 2010 Forensic Science Society. Published by Elsevier Ireland Ltd.. All rights reserved.

  5. A Note about Self-Induced Velocity Generated by a Lifting-Line Wing or Rotor Blade

    NASA Technical Reports Server (NTRS)

    Harris, Franklin D.

    2006-01-01

    This report presents an elementary analysis of the induced velocity created by a field of vortices that reside in the wake of a rotor blade. Progress achieved by other researchers in the last 70 years is briefly reviewed. The present work is presented in four stages of complexity that carry a lifting-line representation of a fixed wing into a single-blade rotor. The analysis leads to the conclusion that the lifting rotor's spiraling vortex wake structure has very high induced power when compared to the ideal wing. For an advanced ratio of one-half, induced power is on the order of 10 times that of the wing when the comparison is made at wingspan equal to rotor diameter and wing and rotor having equal lift.

  6. Inertia-induced dendriticlike patterns in lifting Hele-Shaw flows

    NASA Astrophysics Data System (ADS)

    Anjos, Pedro H. A.; Dias, Eduardo O.; Miranda, José A.

    2017-01-01

    The lifting Hele-Shaw cell problem is a variant of the classical constant-gap Hele-Shaw situation in which the cell gap width is time dependent. Experiments on Newtonian fluid flows in lifting Hele-Shaw cells with large lifting velocities reveal the development of dendriticlike fingered structures that compete among themselves. The usual Darcy law description of the problem, where inertial effects are neglected, has not been able to explain the origin of these competing sidebranched patterns. In this work we use a generalized Darcy law and a perturbative mode-coupling theory to investigate the impact of inertia on the pattern-forming dynamics of the system. Two main results are deduced: Inertia induces a mechanism for finger sidebranching formation and favors the intensification of finger competition events.

  7. Production and characterization of titanium (Ti), platinum (Pt) and tantalum (Ta) thin films for native DNA biosensors

    NASA Astrophysics Data System (ADS)

    Genç, Eminegül; Kepceoǧlu, Abdullah; Gezgin, Serap Yiǧit; Kars, Meltem Demirel; Kılıç, Hamdi Şükür

    2017-02-01

    The use of the femtosecond (fs) laser pulses for ablation applications have several advantageous and Laser-Induced Forward Transfer (LIFT) is an ablation-driven transfer process. The use of fs laser pulses for LIFT is gaining a great attraction nowadays. The most of the Direct Writing (DW) methods are laser based techniques and the LIFT technique is the one of them. This spectacular technique allows high resolution without lithographic processes. In this study, we have grown Ti, Pt and Ta thin films on the microscope slides by Pulse Laser Deposition (PLD) technique using Nd:YAG laser in the high vacuum condition. As a result, thin films produced in this work is a good candidate to produce native DNA biosensors based on LIFT technique.

  8. Preliminary design of a supersonic Short Takeoff and Vertical Landing (STOVL) fighter aircraft

    NASA Technical Reports Server (NTRS)

    Cox, Brian; Borchers, Paul; Gomer, Charlie; Henderson, Dean; Jacobs, Tavis; Lawson, Todd; Peterson, Eric; Ross, Tweed, III; Bellmard, Larry

    1990-01-01

    The preliminary design study of a supersonic Short Takeoff and Vertical Landing (STOVL) fighter is presented. A brief historical survey of powered lift vehicles was presented, followed by a technology assessment of the latest supersonic STOVL engine cycles under consideration by industry and government in the U.S. and UK. A survey of operational fighter/attack aircraft and the modern battlefield scenario were completed to develop, respectively, the performance requirements and mission profiles for the study. Three configurations were initially investigated with the following engine cycles: a hybrid fan vectored thrust cycle, a lift+lift/cruise cycle, and a mixed flow vectored thrust cycle. The lift+lift/cruise aircraft configuration was selected for detailed design work which consisted of: (1) a material selection and structural layout, including engine removal considerations, (2) an aircraft systems layout, (3) a weapons integration model showing the internal weapons bay mechanism, (4) inlet and nozzle integration, (5) an aircraft suckdown prediction, (6) an aircraft stability and control analysis, including a takeoff, hover, and transition control analysis, (7) a performance and mission capability study, and (8) a life cycle cost analysis. A supersonic fighter aircraft with STOVL capability with the lift+lift/cruise engine cycle seems a viable option for the next generation fighter.

  9. Occupational lifting tasks as a risk factor in low back pain: a case-control study in a Mexican population.

    PubMed

    Prado-Leon, Lilia R; Celis, Alfredo; Avila-Chaurand, Rosalio

    2005-01-01

    The objective of this study was to quantify and assess whether lifting tasks in the workplace are a risk factor in lumbar spondyloarthrosis etiology. A case-control study was performed with 231 workers, 18-55 years old, insured by the Mexican Social Security Institute (IMSS, according to its designation in Spanish). A multivariate analysis using conditional logistical regression showed that lifting tasks, combined with driving tasks, are associated with this illness (OR = 7.3; 95% CI 1.7-31.4). The daily frequency of lifting as it interacts with work as a driver resulted in a greater risk (OR = 10.4; 95% CI 2.0-52.5). The load weight, daily task-hours and cumulative time showed a dose-response relationship. The attributable risk for lifting tasks was 0.83, suggesting that 83% of lumbar spondyloarthrosis development could be prevented if risk factors were eliminated by ergonomic redesign of the task.

  10. Lift outs: how to acquire a high-functioning team.

    PubMed

    Groysberg, Boris; Abrahams, Robin

    2006-12-01

    More and more, expanding companies are hiring high-functioning groups of people who have been working together effectively within one company and can rapidly come up to speed in a new environment. These lifted-out teams don't need to get acquainted with one another or to establish shared values, mutual accountability, or group norms; their long-standing relationships and trust help them make an impact very quickly. Of course, the process is not without risks: A failed lift out can lead to loss of money, opportunity, credibility, and even native talent. Boris Groysberg and Robin Abrahams studied more than 40 high-profile moves and interviewed team leaders in multiple industries and countries to examine the risks and opportunities that lift outs present. They concluded that, regardless of industry, nationality, or size of the team, a successful lift out unfolds over four consecutive, interdependent stages that must be meticulously managed. In the courtship stage, the hiring company and the leader of the targeted team determine whether the proposed move is, in fact, a good idea, and then define their business goals and discuss strategies. At the same time, the team leader discusses the potential move with the other members of his or her group to assess their level of interest and prepare them for the change. The second stage involves the integration of the team leader with the new company's top leadership. This part of the process ensures the team's access to senior executives-the most important factor in a lift out's success. Operational integration is the focus of the third stage. Ideally, teams will start out working with the same or similar clients, vendors, and industry standards. The fourth stage entails full cultural integration. To succeed, the lifted-out team members must be willing to re-earn credibility by proving their value and winning their new colleagues' trust.

  11. GOES-R Lift to Stand

    NASA Image and Video Library

    2016-08-23

    An overhead crane lifts the GOES-R spacecraft to move it into its work stand inside the Astrotech payload processing facility in Titusville, Florida near NASA’s Kennedy Space Center. GOES-R will be the first satellite in a series of next-generation NOAA Geostationary Operational Environmental Satellites. The spacecraft is to launch aboard a United Launch Alliance Atlas V rocket in November.

  12. Prevalence, perception and correlates of low back pain among healthcare workers in tertiary health institutions in Sokoto, Nigeria.

    PubMed

    Awosan, Kehinde J; Yikawe, Semen S; Oche, Oche M; Oboirien, Muhammad

    2017-12-01

    Low back pain (LBP) is a common cause of disability worldwide. Healthcare workers are particularly prone to it because of the physical and emotional factors associated with their profession. To determine the prevalence, perception and correlates of LBP among healthcare workers in tertiary health institutions in Sokoto, Nigeria. A cross-sectional study was conducted among 320 healthcare workers selected by multistage sampling technique from July to September 2016. Anthropometry was done for the participants in addition to questionnaire administration. The mean age of the study participants was 36.99 ± 8.23 years. The lifetime, annual, and point prevalence of LBP among the participants were 56.2%, 39.1% and 17.2% respectively. Most, 151 (83.9%) of the 180 participants that have ever experienced LBP reported that it commenced after starting work, and they perceived it to be due to standing for long hours (57.2%), awkward postures (22.2%) and carrying heavy objects/patients at work (20.6%). Older age, female sex, longer duration of practice, overweight/obesity, and lifting heavy objects/patients at work were significantly associated with LBP among the participants. The prevalence of LBP is high among healthcare workers in Sokoto, Nigeria; although it was also associated with older age and female sex, being in practice for 10 years and above, overweight/obesity, and lifting heavy objects/patients at work were the predictors identified. Management of the respective hospitals should prevent workplace exposures to heavy weight/objects by establishing "lift teams" as a temporary measure, and also implement "zero lift programs" in their facilities. Nil.

  13. Parametric study of microwave-powered high-altitude airplane platforms designed for linear flight

    NASA Technical Reports Server (NTRS)

    Morris, C. E. K., Jr.

    1981-01-01

    The performance of a class of remotely piloted, microwave powered, high altitude airplane platforms is studied. The first part of each cycle of the flight profile consists of climb while the vehicle is tracked and powered by a microwave beam; this is followed by gliding flight back to a minimum altitude above a microwave station and initiation of another cycle. Parametric variations were used to define the effects of changes in the characteristics of the airplane aerodynamics, the energy transmission systems, the propulsion system, and winds. Results show that wind effects limit the reduction of wing loading and the increase of lift coefficient, two effective ways to obtain longer range and endurance for each flight cycle. Calculated climb performance showed strong sensitivity to some power and propulsion parameters. A simplified method of computing gliding endurance was developed.

  14. Thread-Lift Sutures: Still in the Lift? A Systematic Review of the Literature.

    PubMed

    Gülbitti, Haydar Aslan; Colebunders, Britt; Pirayesh, Ali; Bertossi, Dario; van der Lei, Berend

    2018-03-01

    In 2006, Villa et al. published a review article concerning the use of thread-lift sutures and concluded that the technique was still in its infancy but had great potential to become a useful and effective procedure for nonsurgical lifting of sagged facial tissues. As 11 years have passed, the authors now performed again a systematic review to determine the real scientific current state of the art on the use of thread-lift sutures. A systematic review was performed according to Preferred Reporting Items for Systematic Reviews and Meta-Analyses guidelines using the PubMed database and using the Medical Subject Headings search term "Rhytidoplasty." "Rhytidoplasty" and the following entry terms were included by this Medical Subject Headings term: "facelift," "facelifts," "face Lift," "Face Lifts," "Lift," "Face," "Lifts," "Platysmotomy," "Platysmotomies," "Rhytidectomy," "Rhytidectomies," "Platysmaplasty," "and "Platysmaplasties." The Medical Subject Headings term "Rhytidoplasty" was combined with the following search terms: "Barbed suture," "Thread lift," "APTOS," "Suture suspension," "Percutaneous," and "Silhouette suture." RefWorks was used to filter duplicates. Three of the authors (H.A.G., B.C., and B.L.) performed the search independently. The initial search with all search terms resulted in 188 articles. After filtering the duplicates and the articles about open procedures, a total of 41 articles remained. Of these, the review articles, case reports, and letters to the editor were subsequently excluded, as were reports dealing with nonbarbed sutures, such as Vicryl and Prolene with Gore-Tex. This resulted in a total of 12 articles, seven additional articles since the five articles reviewed by Villa et al. The authors' review demonstrated that, within the past decade, little or no substantial evidence has been added to the peer-reviewed literature to support or sustain the promising statement about thread-lift sutures as made by Villa et al. in 2006 in terms of efficacy or safety. All included literature in the authors' review, except two studies, demonstrated at best a very limited durability of the lifting effect. The two positive studies were sponsored by the companies that manufacture the thread-lift sutures.

  15. Refined AFC-Enabled High-Lift System Integration Study

    NASA Technical Reports Server (NTRS)

    Hartwich, Peter M.; Shmilovich, Arvin; Lacy, Douglas S.; Dickey, Eric D.; Scalafani, Anthony J.; Sundaram, P.; Yadlin, Yoram

    2016-01-01

    A prior trade study established the effectiveness of using Active Flow Control (AFC) for reducing the mechanical complexities associated with a modern high-lift system without sacrificing aerodynamic performance at low-speed flight conditions representative of takeoff and landing. The current technical report expands on this prior work in two ways: (1) a refined conventional high-lift system based on the NASA Common Research Model (CRM) is presented that is more representative of modern commercial transport aircraft in terms of stall characteristics and maximum Lift/Drag (L/D) ratios at takeoff and landing-approach flight conditions; and (2) the design trade space for AFC-enabled high-lift systems is expanded to explore a wider range of options for improving their efficiency. The refined conventional high-lift CRM (HL-CRM) concept features leading edge slats and slotted trailing edge flaps with Fowler motion. For the current AFC-enhanced high lift system trade study, the refined conventional high-lift system is simplified by substituting simply-hinged trailing edge flaps for the slotted single-element flaps with Fowler motion. The high-lift performance of these two high-lift CRM variants is established using Computational Fluid Dynamics (CFD) solutions to the Reynolds-Averaged Navier-Stokes (RANS) equations. These CFD assessments identify the high-lift performance that needs to be recovered through AFC to have the CRM variant with the lighter and mechanically simpler high-lift system match the performance of the conventional high-lift system. In parallel to the conventional high-lift concept development, parametric studies using CFD guided the development of an effective and efficient AFC-enabled simplified high-lift system. This included parametric trailing edge flap geometry studies addressing the effects of flap chord length and flap deflection. As for the AFC implementation, scaling effects (i.e., wind-tunnel versus full-scale flight conditions) are addressed, as are AFC architecture aspects such as AFC unit placement, number AFC units, operating pressures, mass flow rates, and steady versus unsteady AFC applications. These efforts led to the development of a novel traversing AFC actuation concept which is efficient in that it reduces the AFC mass flow requirements by as much as an order of magnitude compared to previous AFC technologies, and it is predicted to be effective in driving the aerodynamic performance of a mechanical simplified high-lift system close to that of the reference conventional high-lift system. Conceptual system integration studies were conducted for the AFC-enhanced high-lift concept applied to a NASA Environmentally Responsible Aircraft (ERA) reference configuration, the so-called ERA-0003 concept. The results from these design integration assessments identify overall system performance improvement opportunities over conventional high-lift systems that suggest the viability of further technology maturation efforts for AFC-enabled high lift flap systems. To that end, technical challenges are identified associated with the application of AFC-enabled high-lift systems to modern transonic commercial transports for future technology maturation efforts.

  16. Comparison between low-cost marker-less and high-end marker-based motion capture systems for the computer-aided assessment of working ergonomics.

    PubMed

    Patrizi, Alfredo; Pennestrì, Ettore; Valentini, Pier Paolo

    2016-01-01

    The paper deals with the comparison between a high-end marker-based acquisition system and a low-cost marker-less methodology for the assessment of the human posture during working tasks. The low-cost methodology is based on the use of a single Microsoft Kinect V1 device. The high-end acquisition system is the BTS SMART that requires the use of reflective markers to be placed on the subject's body. Three practical working activities involving object lifting and displacement have been investigated. The operational risk has been evaluated according to the lifting equation proposed by the American National Institute for Occupational Safety and Health. The results of the study show that the risk multipliers computed from the two acquisition methodologies are very close for all the analysed activities. In agreement to this outcome, the marker-less methodology based on the Microsoft Kinect V1 device seems very promising to promote the dissemination of computer-aided assessment of ergonomics while maintaining good accuracy and affordable costs. PRACTITIONER’S SUMMARY: The study is motivated by the increasing interest for on-site working ergonomics assessment. We compared a low-cost marker-less methodology with a high-end marker-based system. We tested them on three different working tasks, assessing the working risk of lifting loads. The two methodologies showed comparable precision in all the investigations.

  17. Aerodynamics of high frequency flapping wings

    NASA Astrophysics Data System (ADS)

    Hu, Zheng; Roll, Jesse; Cheng, Bo; Deng, Xinyan

    2010-11-01

    We investigated the aerodynamic performance of high frequency flapping wings using a 2.5 gram robotic insect mechanism developed in our lab. The mechanism flaps up to 65Hz with a pair of man-made wing mounted with 10cm wingtip-to-wingtip span. The mean aerodynamic lift force was measured by a lever platform, and the flow velocity and vorticity were measured using a stereo DPIV system in the frontal, parasagittal, and horizontal planes. Both near field (leading edge vortex) and far field flow (induced flow) were measured with instantaneous and phase-averaged results. Systematic experiments were performed on the man-made wings, cicada and hawk moth wings due to their similar size, frequency and Reynolds number. For insect wings, we used both dry and freshly-cut wings. The aerodynamic force increase with flapping frequency and the man-made wing generates more than 4 grams of lift at 35Hz with 3 volt input. Here we present the experimental results and the major differences in their aerodynamic performances.

  18. Space Shuttle Discovery lifts off successfully

    NASA Technical Reports Server (NTRS)

    1998-01-01

    Framed by the foliage of the Canaveral National Sea Shore, Space Shuttle Discovery soars through bright blue skies as it lifts off from Launch Pad 39B at 2:19 p.m. EST Oct. 29 on mission STS-95. Making his second voyage into space after 36 years is Payload Specialist John H. Glenn Jr., senator from Ohio. Other crew members are Mission Commander Curtis L. Brown Jr., Pilot Steven W. Lindsey, Payload Specialist Chiaki Mukai, (M.D., Ph.D.), with the National agency for Space Development (NASDA), Mission Specialist Stephen K. Robinson, Mission Specialist Pedro Duque of Spain, representing the European Space Agency (ESA), and Mission Specialist Scott E. Parazynski. The STS-95 mission includes research payloads such as the Spartan solar-observing deployable spacecraft, the Hubble Space Telescope Orbital Systems Test Platform, the International Extreme Ultraviolet Hitchhiker, as well as the SPACEHAB single module with experiments on space flight and the aging process. Discovery is expected to return to KSC at 11:49 a.m. EST on Nov. 7.

  19. Space Shuttle Discovery lifts off successfully

    NASA Technical Reports Server (NTRS)

    1998-01-01

    Clouds of exhaust and blazing light fill Launch Pad 39B as Space Shuttle Discovery lifts off at 2:19 p.m. EST Oct. 29 on mission STS-95. Making his second voyage into space after 36 years is Payload Specialist John H. Glenn Jr., senator from Ohio. Other crew members are Mission Commander Curtis L. Brown Jr., Pilot Steven W. Lindsey, Payload Specialist Chiaki Mukai, (M.D., Ph.D.), with the National Space Development Agency of Japan (NASDA), Mission Specialist Stephen K. Robinson, Mission Specialist Pedro Duque of Spain, representing the European Space Agency (ESA), and Mission Specialist Scott E. Parazynski. The STS-95 mission includes research payloads such as the Spartan solar-observing deployable spacecraft, the Hubble Space Telescope Orbital Systems Test Platform, the International Extreme Ultraviolet Hitchhiker, as well as the SPACEHAB single module with experiments on space flight and the aging process. Discovery is expected to return to KSC at 11:49 a.m. EST on Nov. 7.

  20. Space Shuttle Discovery lifts off successfully

    NASA Technical Reports Server (NTRS)

    1998-01-01

    Clouds of exhaust seem to fill the marsh near Launch Pad 39B as Space Shuttle Discovery lifts off at 2:19 p.m. EST Oct. 29 on mission STS-95. Making his second voyage into space after 36 years is Payload Specialist John H. Glenn Jr., senator from Ohio. Other crew members are Mission Commander Curtis L. Brown Jr., Pilot Steven W. Lindsey, Payload Specialist Chiaki Mukai, (M.D., Ph.D.), with the National Space Development Agency of Japan (NASDA), Mission Specialist Stephen K. Robinson, Mission Specialist Pedro Duque of Spain, representing the European Space Agency (ESA), and Mission Specialist Scott E. Parazynski. The STS-95 mission includes research payloads such as the Spartan solar-observing deployable spacecraft, the Hubble Space Telescope Orbital Systems Test Platform, the International Extreme Ultraviolet Hitchhiker, as well as the SPACEHAB single module with experiments on space flight and the aging process. Discovery is expected to return to KSC at 11:49 a.m. EST on Nov. 7.

  1. Energy extraction from atmospheric turbulence to improve flight vehicle performance

    NASA Astrophysics Data System (ADS)

    Patel, Chinmay Karsandas

    Small 'bird-sized' Unmanned Aerial Vehicles (UAVs) have now become practical due to technological advances in embedded electronics, miniature sensors and actuators, and propulsion systems. Birds are known to take advantage of wind currents to conserve energy and fly long distances without flapping their wings. This dissertation explores the possibility of improving the performance of small UAVs by extracting the energy available in atmospheric turbulence. An aircraft can gain energy from vertical gusts by increasing its lift in regions of updraft and reducing its lift in downdrafts - a concept that has been known for decades. Starting with a simple model of a glider flying through a sinusoidal gust, a parametric optimization approach is used to compute the minimum gust amplitude and optimal control input required for the glider to sustain flight without losing energy. For small UAVs using optimal control inputs, sinusoidal gusts with amplitude of 10--15% of the cruise speed are sufficient to keep the aircraft aloft. The method is then modified and extended to include random gusts that are representative of natural turbulence. A procedure to design optimal control laws for energy extraction from realistic gust profiles is developed using a Genetic Algorithm (GA). A feedback control law is designed to perform well over a variety of random gusts, and not be tailored for one particular gust. A small UAV flying in vertical turbulence is shown to obtain average energy savings of 35--40% with the use of a simple control law. The design procedure is also extended to determine optimal control laws for sinusoidal as well as turbulent lateral gusts. The theoretical work is complemented by experimental validation using a small autonomous UAV. The development of a lightweight autopilot and UAV platform is presented. Flight test results show that active control of the lift of an autonomous glider resulted in approximately 46% average energy savings compared to glides with fixed control surfaces. Statistical analysis of test samples shows that 19% of the active control test runs resulted in no energy loss, thus demonstrating the potential of the 'gust soaring' concept to dramatically improve the performance of small UAVs.

  2. Micropatterns of Matrigel for three-dimensional epithelial cultures.

    PubMed

    Sodunke, Temitope R; Turner, Keneshia K; Caldwell, Sarah A; McBride, Kevin W; Reginato, Mauricio J; Noh, Hongseok Moses

    2007-09-01

    Three-dimensional (3D) epithelial culture models are widely used to promote a physiologically relevant microenvironment for the study of normal and aberrant epithelial organization. Despite the increased use of these models, their potential as a cell-based screening tool for therapeutics has been hindered by the lack of existing platforms for large-scale 3D cellular studies. Current 3D standard culture does not allow for single spheroid or 'acinus' analysis required for high-throughput systems. Here, we present general strategies for creating bulk micropatterns of Matrigel that can be used as a platform for 3D epithelial culture and cell-based assays at the single acinus level. Both buried and free-standing micropatterns of Matrigel were created using modified soft lithography techniques such as microtransfer molding (microTM) and dry lift-off technique. Surface modification of poly(dimethylsiloxane) (PDMS) with oxygen plasma followed by treatment with poly(2-hydroxy-ethylmethacrylate) (poly-HEMA) was sufficient to promote deformation-free release of Matrigel patterns. In addition, a novel dual-layer dry lift-off technique was developed to simultaneously generate patterns of Matrigel and poly-HEMA on a single substrate. We also demonstrate that the micropatterned Matrigel can support 3D culture originating from a single normal human mammary epithelial (MCF-10A) cell or a human breast cancer cell (MDA-MB-231) with comparable phenotypes to standard 3D culture techniques. Culture of normal MCF-10A cells on micropatterned Matrigel resulted in formation of structures with the characteristic apoptosis of centrally located cells and formation of hollow lumens. Moreover, the carcinoma cell line showed their characteristic formation of disorganized invasive cellular clusters, lacking the normal epithelial architecture on micropatterned Matrigel. Hence, micropatterned Matrigel can be used as a 3D epithelial cell-based platform for a wide variety of applications in epithelial and cancer biology, tissue engineering, as well as gene/drug screening technology.

  3. An experimental comparison of two adaptation strategies in an adaptive-walls wind-tunnel

    NASA Astrophysics Data System (ADS)

    Russo, G. P.; Zuppardi, G.; Basciani, M.

    1995-08-01

    In the present work an experimental comparison is made between two adaptation strategies: the Judd's method and the Everhart's method. A NACA 0012 airfoil has been tested at Mach numbers up to 0.4: models with chords up to 200 mm have been tested in a 200 mm × 200 mm test section. The two strategies, though based on different theoretical approaches, show a fairly good agreement as far as c p distribution on the model, lift and drag curves and residual interference are concerned and agree, in terms of lift curve slope and drag coefficient at zero lift, with the McCroskey correlation.

  4. Laser-induced forward transfer of single-walled carbon nanotubes

    NASA Astrophysics Data System (ADS)

    Palla-Papavlu, A.; Dinescu, M.; Wokaun, A.; Lippert, T.

    2014-10-01

    The objective of this work is the application of laser-induced forward transfer (LIFT) for the fabrication of chemiresistor sensors. The receiver substrate is an array with metal electrodes and the active materials placed by LIFT are single-walled carbon nanotubes (SWCNT). The functionality of such sensors depends on the geometry of the active material onto the metallic electrodes. First the best geometry for the sensing materials and electrodes was determined, including the optimization of the process parameters for printing uniform pixels of SWCNT onto the sensor electrodes. The sensors were characterized in terms of their sensing characteristics, i.e., upon exposure to ammonia, proving the feasibility of LIFT.

  5. Flow Field Characteristics and Lift Changing Mechanism for Half-Rotating Wing in Hovering Flight

    NASA Astrophysics Data System (ADS)

    Li, Q.; Wang, X. Y.; Qiu, H.; Li, C. M.; Qiu, Z. Z.

    2017-12-01

    Half-rotating wing (HRW) is a new similar-flapping wing system based on half-rotating mechanism which could perform rotating-type flapping instead of oscillating-type flapping. The characteristics of flow field and lift changing mechanism for HRW in hovering flight are important theoretical basis to improve the flight capability of HRW aircraft. The driving mechanism and work process of HRW were firstly introduced in this paper. Aerodynamic simulation model of HRW in hovering flight was established and solved using XFlow software, by which lift changing rule of HRW was drawn from the simulation solution. On the other hand, the development and shedding of the distal vortex throughout one stroke would lead to the changes of the lift force. Based on analyzing distribution characteristics of vorticity, velocity and pressure around wing blade, the main features of the flow field for HRW were further given. The distal attached vortex led to the increase of the lift force, which would gradually shed into the wake with a decline of lift in the later downstroke. The wake ring directed by the distal end of the blade would generate the downward accelerating airflow which produced the upward anti-impulse to HRW. The research results mentioned above illustrated that the behavior characteristics of vortex formed in flow field were main cause of lift changing for HRW.

  6. Flow phenomena on plates and airfoils of short span

    NASA Technical Reports Server (NTRS)

    Winter, H

    1936-01-01

    Investigations on the flow phenomena at plates and cambered models were carried out with the aid of force measurements, some pressure distribution measurements, and photographic observation. The experimental methods are described and the results given. Section III of this work gives a comprehensive account of the results and enables us to see how nearly the lift line and lift surface theories agree with the experimental results.

  7. Construction Equipment

    NASA Astrophysics Data System (ADS)

    1983-01-01

    FMC Corporation conducts extensive proof lift tests and computerized analysis to insure that the cranes can lift rated capacity loads up to one million pounds in a wide range of applications. In their analysis work, engineers makes use of a computer program supplied by COSMIC. Called Analysis of Beam Columns, the program is used as part of the required analysis for determining bending moments, deflections and critical load for latticed crane booms.

  8. Review on risk factors related to lower back disorders at workplace

    NASA Astrophysics Data System (ADS)

    A' Tifah Jaffar, Nur; Nasrull Abdol Rahman, Mohd

    2017-08-01

    This review examines the evidence of the occurrence of risk exposure on work-related lower back disorders in the workplace. This review also investigates potential interactions between the risk factors in the workplace which include heavy physical work risk factor, static work postures risk factor, frequent bending and twisting risk factor, lifting risk factor, pushing and pulling risk factor, repetitive work risk factor, vibration risk factor, psychological and psychosocial risk factor that may be associated with symptoms of musculoskeletal disorders of lower back. These risk factors can reinforce each other and their influence can also be mediated by cultural or social factors. A systematic review of the literature was carried out by searching using databases and the searching strategy was used combined keyword for risk factors, work-related lower back disorders, heavy physical work, static work postures, frequent bending and twisting, lifting, pushing and pulling, repetitive work, vibration, psychological and psychosocial risk factor. A total of 67 articles were identified and reviewed. The risk factors identified that related for low back disorder are seven which are heavy physical work, static work postures, frequent bending and twisting, lifting, pushing and pulling, repetitive work, vibration, psychological and psychosocial risk factor and the level of evidence supporting the relationship with lower back disorders also described such as strong, moderate, insufficient, limited and no evidence. This result confirms that, existing of higher physical and psychosocial demand related to reported risk factors of low back disorders. The result also showed that previous reviews had evaluated relationship between risk factors of low back disorders and specific types of musculoskeletal disorders. This review also highlights the scarves evidence regarding some of the frequently reported risk factors for work related lower back disorders.

  9. Effects of β-alanine supplementation during a 5-week strength training program: a randomized, controlled study.

    PubMed

    Maté-Muñoz, José Luis; Lougedo, Juan H; Garnacho-Castaño, Manuel V; Veiga-Herreros, Pablo; Lozano-Estevan, María Del Carmen; García-Fernández, Pablo; de Jesús, Fernando; Guodemar-Pérez, Jesús; San Juan, Alejandro F; Domínguez, Raúl

    2018-01-01

    β-Alanine (BA) is a non-essential amino acid that has been shown to enhance exercise performance. The purpose of this investigation was to determine if BA supplementation improved the adaptive response to five weeks of a resistance training program. Thirty healthy, strength-trained individuals were randomly assigned to the experimental groups placebo (PLA) or BA. Over 5 weeks of strength training, subjects in BA took 6.4 g/day of BA as 8 × 800 mg doses each at least 1.5 h apart. The training program consisted of 3 sessions per week in which three different leg exercises were conducted as a circuit (back squat, barbell step ups and loaded jumping lunges). The program started with 3 sets of 40 s of work per exercise and rest periods between sets of 120 s in the first week. This training volume was then gradually built up to 5 sets of 20 s work/60 s rest in the fifth week. The work load during the program was set by one of the authors according to the individual's perceived effort the previous week. The variables measured were average velocity, peak velocity, average power, peak power, and load in kg in a back squat, incremental load, one-repetition maximum (1RM) test. In addition, during the rest period, jump ability (jump height and power) was assessed on a force platform. To compare data, a general linear model with repeated measures two-way analysis of variance was used. Significantly greater training improvements were observed in the BA group versus PLA group ( p  = 0.045) in the variables average power at 1RM (BA: 42.65%, 95% CI, 432.33, 522.52 VS. PLA: 21.07%, 95% CI, 384.77, 482.19) and average power at maximum power output ( p  = 0.037) (BA: 20.17%, 95% CI, 637.82, 751.90 VS. PLA; 10.74%, 95% CI, 628.31, 751.53). The pre- to post training average power gain produced at 1RM in BA could be explained by a greater maximal strength gain, or load lifted at 1RM ( p  = 0.014) (24 kg, 95% CI, 19.45, 28.41 VS. 16 kg, 95% CI, 10.58, 20.25) and in the number of sets executed ( p  = 0.025) in the incremental load test (BA: 2.79 sets, 95% CI, 2.08, 3.49 VS. PLA: 1.58 sets, 95% CI, 0.82, 2.34). β-Alanine supplementation was effective at increasing power output when lifting loads equivalent to the individual's maximal strength or when working at maximum power output. The improvement observed at 1RM was explained by a greater load lifted, or strength gain, in response to training in the participants who took this supplement.

  10. The Cumulative Lifting Index (CULI) for the Revised NIOSH Lifting Equation: Quantifying Risk for Workers With Job Rotation.

    PubMed

    Garg, Arun; Kapellusch, Jay M

    2016-08-01

    The objectives were to: (a) develop a continuous frequency multiplier (FM) for the Revised NIOSH Lifting Equation (RNLE) as a function of lifting frequency and duration of a lifting task, and (b) describe the Cumulative Lifting Index (CULI), a methodology for estimating physical exposure to workers with job rotation. The existing FM for the RNLE (FME) does not differentiate between task duration >2 hr and <8 hr, which makes quantifying physical exposure to workers with job rotation difficult and presents challenges to job designers. Using the existing FMs for 1, 2, and 8 hr of task durations, we developed a continuous FM (FMP) that extends to 12 hr per day. We simulated 157,500 jobs consisting of two tasks each and, using different combinations of Frequency Independent Lifting Index, lifting frequency and duration of lifting. Biomechanical stresses were estimated using the CULI, time-weighted average (TWA), and peak exposure. The median difference between FME and FMP was ±1% (range: 0%-15%). Compared to CULI, TWA underestimated risk of low-back pain (LBP) for 18% to 30% of jobs, and peak exposure for an assumed 8-hr work shift overestimated risk of LBP for 20% to 25% of jobs. Peak task exposure showed 90% agreement with CULI but ignored one of two tasks. The CULI partially addressed the underestimation of physical exposure using the TWA approach and overestimation of exposure using the peak-exposure approach. The proposed FM and CULI may provide more accurate physical exposure estimates, and therefore estimated risk of LBP, for workers with job rotation. © 2016, Human Factors and Ergonomics Society.

  11. Launch Vehicle Demonstrator Using Shuttle Assets

    NASA Technical Reports Server (NTRS)

    Creech, Dennis M.; Threet, Grady E., Jr.; Philips, Alan D.; Waters, Eric D.

    2011-01-01

    The Advanced Concepts Office at NASA's George C. Marshall Space Flight Center undertook a study to define candidate early heavy lift demonstration launch vehicle concepts derived from existing space shuttle assets. The objective was to determine the performance capabilities of these vehicles and characterize potential early demonstration test flights. Given the anticipated budgetary constraints that may affect America's civil space program, and a lapse in U.S. heavy launch capability with the retirement of the space shuttle, an early heavy lift launch vehicle demonstration flight would not only demonstrate capabilities that could be utilized for future space exploration missions, but also serve as a building block for the development of our nation s next heavy lift launch system. An early heavy lift demonstration could be utilized as a test platform, demonstrating capabilities of future space exploration systems such as the Multi Purpose Crew Vehicle. By using existing shuttle assets, including the RS-25D engine inventory, the shuttle equipment manufacturing and tooling base, and the segmented solid rocket booster industry, a demonstrator concept could expedite the design-to-flight schedule while retaining critical human skills and capital. In this study two types of vehicle designs are examined. The first utilizes a high margin/safety factor battleship structural design in order to minimize development time as well as monetary investment. Structural design optimization is performed on the second, as if an operational vehicle. Results indicate low earth orbit payload capability is more than sufficient to support various vehicle and vehicle systems test programs including Multi-Purpose Crew Vehicle articles. Furthermore, a shuttle-derived, hydrogen core vehicle configuration offers performance benefits when trading evolutionary paths to maximum capability.

  12. Intelligent Fasteners

    NASA Technical Reports Server (NTRS)

    1997-01-01

    Under a Small Business Innovation Research contract from Marshall Space Flight Center, Ultrafast, Inc. developed the world's first, high-temperature resistant, "intelligent" fastener. NASA needed a critical-fastening appraisal and validation of spacecraft segments that are coupled together in space. The intelligent-bolt technology deletes the self-defeating procedure of having to untighten the fastener, and thus upset the joint, during inspection and maintenance. The Ultrafast solution yielded an innovation that is likely to revolutionize manufacturing assembly, particularly the automobile industry. Other areas of application range from aircraft, computers and fork-lifts to offshore platforms, buildings, and bridges.

  13. KSC-08pd0280

    NASA Image and Video Library

    2008-02-12

    KENNEDY SPACE CENTER, FLA. -- Viewed from an upper level in the Vehicle Assembly Building, space shuttle Endeavour is slowly lifted to the top of high bay 1. Crossing the I-beam, the shuttle will then be lowered onto the mobile launcher platform for mating with the external tank and solid rocket boosters in preparation for launch on the STS-123 mission, targeted for March 11. The mission will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre. Photo credit: NASA/Dimitri Gerondidakis

  14. 1983 LTA technology assessment

    NASA Technical Reports Server (NTRS)

    Ashford, R. L.; Browning, R. G. E.; Levitt, B. B.; Mayer, N. J.; Woodward, D. E.

    1983-01-01

    Several aspects of LTA (lighter-than-air) technology development are reviewed. Technological developments of classical airships through 1974 are examined. A brief historical and technological summary of five specialized LTA equipment concepts is presented: metal-clad airships, free balloons, semibuoyant vehicles, high-altitude platforms, and tethered aerostats. Current LTA technology developments are reviewed with particular emphasis on VTOL airships capable of heavy lift and on long endurance types for coastal maritime patrol. Finally, the future prospects of LTA system development are considered with attention given to manned conventional and hybrid vehicles, tethered vehicles, and RPVs.

  15. KSC-99pc0142

    NASA Image and Video Library

    1999-01-28

    The KSC-developed X-33 weight simulator (top), known as the "iron bird," is lifted to a vertical position at the X-33 launch site as part of launch equipment testing on Edwards Air Force Base, CA. The simulator matches the 75,000-pound weight and 63-foot height of the X-33 vehicle that will be using the launch equipment. KSC's Vehicle Positioning System (VPS) placed the simulator on the rotating launch platform prior to the rotation. The new VPS will dramatically reduce the amount of manual labor required to position a reusable launch vehicle for liftoff

  16. KSC-99pc0145

    NASA Image and Video Library

    1999-01-28

    The KSC-developed X-33 weight simulator (top, right), known as the "iron bird," is lifted to a vertical position at the X-33 launch site as part of launch equipment testing on Edwards Air Force Base, CA. The simulator matches the 75,000-pound weight and 63-foot height of the X-33 vehicle that will be using the launch equipment. KSC's Vehicle Positioning System (VPS) placed the simulator on the rotating launch platform prior to the rotation. The new VPS will dramatically reduce the amount of manual labor required to position a reusable launch vehicle for liftoff

  17. Trends in work-related musculoskeletal disorders: a comparison of risk factors for symptoms using quality of work life data from the 2002 and 2006 general social survey.

    PubMed

    Waters, Thomas R; Dick, Robert B; Krieg, Edward F

    2011-09-01

    To assess trends in risk factors for work-related musculoskeletal disorders (MSDs). Results from two similar national surveys (2002 and 2006) examined trends in relationships between individual, psychosocial, and physical factors and MSDs. Findings between years were similar, but important differences included a stronger effect of "Work Stress" on "Pain in Arms," and a stronger combined effect of "Hand Movement" and "Work Stress" on "Pain in Arms." Also, two interactions were statistically significant in the 2006 data, but not in the 2002 data, revealing potentially increased risks. These were "Hand Movement" and "Work Stress" on "Back Pain," and "Heavy Lifting" and "Work Stress" on "Pain in Arms." New strategies for preventing both low back and upper extremity MSDs should focus on work stress, heavy lifting, and hand movement, individually and in combination. (C)2011The American College of Occupational and Environmental Medicine

  18. Reynolds number scalability of bristled wings performing clap and fling

    NASA Astrophysics Data System (ADS)

    Jacob, Skyler; Kasoju, Vishwa; Santhanakrishnan, Arvind

    2017-11-01

    Tiny flying insects such as thrips show a distinctive physical adaptation in the use of bristled wings. Thrips use wing-wing interaction kinematics for flapping, in which a pair of wings clap together at the end of upstroke and fling apart at the beginning of downstroke. Previous studies have shown that the use of bristled wings can reduce the forces needed for clap and fling at Reynolds number (Re) on the order of 10. This study examines if the fluid dynamic advantages of using bristled wings also extend to higher Re on the order of 100. A robotic clap and fling platform was used for this study, in which a pair of physical wing models were programmed to execute clap and fling kinematics. Force measurements were conducted on solid (non-bristled) and bristled wing pairs. The results show lift and drag forces were both lower for bristled wings when compared to solid wings for Re ranging from 1-10, effectively increasing peak lift to peak drag ratio of bristled wings. However, peak lift to peak drag ratio was lower for bristled wings at Re =120 as compared to solid wings, suggesting that bristled wings may be uniquely advantageous for Re on the orders of 1-10. Flow structures visualized using particle image velocimetry (PIV) and their impact on force production will be presented.

  19. Large-scale Parallel Unstructured Mesh Computations for 3D High-lift Analysis

    NASA Technical Reports Server (NTRS)

    Mavriplis, Dimitri J.; Pirzadeh, S.

    1999-01-01

    A complete "geometry to drag-polar" analysis capability for the three-dimensional high-lift configurations is described. The approach is based on the use of unstructured meshes in order to enable rapid turnaround for complicated geometries that arise in high-lift configurations. Special attention is devoted to creating a capability for enabling analyses on highly resolved grids. Unstructured meshes of several million vertices are initially generated on a work-station, and subsequently refined on a supercomputer. The flow is solved on these refined meshes on large parallel computers using an unstructured agglomeration multigrid algorithm. Good prediction of lift and drag throughout the range of incidences is demonstrated on a transport take-off configuration using up to 24.7 million grid points. The feasibility of using this approach in a production environment on existing parallel machines is demonstrated, as well as the scalability of the solver on machines using up to 1450 processors.

  20. Modeling of process of lifting power change of baker's yeast pressed depending on nature and quantity of introduced vegetable component

    NASA Astrophysics Data System (ADS)

    Belokurov, S. V.; Rodionova, N. S.; Belokurova, E. V.; Alexeeva, T. V.

    2018-05-01

    The work presents data on the effect of non-traditional powdered semi-finished products of plant origin: chokeberry, walnut partitions and sea buckthorn berries on the lifting power of baker's yeast. Various amounts of powdered semi-finished products of plant origin are introduced into the dough, directly at the stage of introducing the main components of the formulation, replacing them with some of the wheat flour. Studies have shown that the addition of small amounts of unconventional powdered plant-based semi-finished products (1 ... 5%) makes it possible to correct the lifting power of baking yeast, which, in consequence, affects the quality indicators of finished products. The paper presents a mathematical model of the change in the lift strength of baker's yeast, depending on the nature and amount of the powdered semi-finished product introduced.

  1. Progress in high-lift aerodynamic calculations

    NASA Technical Reports Server (NTRS)

    Rogers, Stuart E.

    1993-01-01

    The current work presents progress in the effort to numerically simulate the flow over high-lift aerodynamic components, namely, multi-element airfoils and wings in either a take-off or a landing configuration. The computational approach utilizes an incompressible flow solver and an overlaid chimera grid approach. A detailed grid resolution study is presented for flow over a three-element airfoil. Two turbulence models, a one-equation Baldwin-Barth model and a two equation k-omega model are compared. Excellent agreement with experiment is obtained for the lift coefficient at all angles of attack, including the prediction of maximum lift when using the two-equation model. Results for two other flap riggings are shown. Three-dimensional results are presented for a wing with a square wing-tip as a validation case. Grid generation and topology is discussed for computing the flow over a T-39 Sabreliner wing with flap deployed and the initial calculations for this geometry are presented.

  2. Comparison between prediction and experiment for all-movable wing and body combinations at supersonic speeds : lift, pitching moment, and hinge moment

    NASA Technical Reports Server (NTRS)

    Nielsen, Jack N; Kaattari, George E; Drake, William C

    1952-01-01

    A simple method is presented for estimating lift, pitching-moment, and hinge-moment characteristics of all-movable wings in the presence of a body as well as the characteristics of wing-body combinations employing such wings. In general, good agreement between the method and experiment was obtained for the lift and pitching moment of the entire wing-body combination and for the lift of the wing in the presence of the body. The method is valid for moderate angles of attack, wing deflection angles, and width of gap between wing and body. The method of estimating hinge moment was not considered sufficiently accurate for triangular all-movable wings. An alternate procedure is proposed based on the experimental moment characteristics of the wing alone. Further theoretical and experimental work is required to substantiate fully the proposed procedure.

  3. Determining the number of fingers in the lifting Hele-Shaw problem

    NASA Astrophysics Data System (ADS)

    Miranda, Jose; Dias, Eduardo

    2013-11-01

    The lifting Hele-Shaw cell flow is a variation of the celebrated radial viscous fingering problem for which the upper cell plate is lifted uniformly at a specified rate. This procedure causes the formation of intricate interfacial patterns. Most theoretical studies determine the total number of emerging fingers by maximizing the linear growth rate, but this generates discrepancies between theory and experiments. In this work, we tackle the number of fingers selection problem in the lifting Hele-Shaw cell by employing the recently proposed maximum-amplitude criterion. Our linear stability analysis accounts for the action of capillary, viscous normal stresses, and wetting effects, as well as the cell confinement. The comparison of our results with very precise laboratory measurements for the total number of fingers shows a significantly improved agreement between theoretical predictions and experimental data. We thank CNPq (Brazilian Sponsor) for financial support.

  4. Creating drag and lift curves from soccer trajectories

    NASA Astrophysics Data System (ADS)

    Goff, John Eric; Kelley, John; Hobson, Chad M.; Seo, Kazuya; Asai, Takeshi; Choppin, S. B.

    2017-07-01

    Trajectory analysis is an alternative to using wind tunnels to measure a soccer ball’s aerodynamic properties. It has advantages over wind tunnel testing such as being more representative of game play. However, previous work has not presented a method that produces complete, speed-dependent drag and lift coefficients. Four high-speed cameras in stereo-calibrated pairs were used to measure the spatial co-ordinates for 29 separate soccer trajectories. Those trajectories span a range of launch speeds from 9.3 to 29.9 m s-1. That range encompasses low-speed laminar flow of air over a soccer ball, through the drag crises where air flow is both laminar and turbulent, and up to high-speed turbulent air flow. Results from trajectory analysis were combined to give speed-dependent drag and lift coefficient curves for the entire range of speeds found in the 29 trajectories. The average root mean square error between the measured and modelled trajectory was 0.028 m horizontally and 0.034 m vertically. The drag and lift crises can be observed in the plots of drag and lift coefficients respectively.

  5. Aerodynamics of High-Lift Configuration Civil Aircraft Model in JAXA

    NASA Astrophysics Data System (ADS)

    Yokokawa, Yuzuru; Murayama, Mitsuhiro; Ito, Takeshi; Yamamoto, Kazuomi

    This paper presents basic aerodynamics and stall characteristics of the high-lift configuration aircraft model JSM (JAXA Standard Model). During research process of developing high-lift system design method, wind tunnel testing at JAXA 6.5m by 5.5m low-speed wind tunnel and Navier-Stokes computation on unstructured hybrid mesh were performed for a realistic configuration aircraft model equipped with high-lift devices, fuselage, nacelle-pylon, slat tracks and Flap Track Fairings (FTF), which was assumed 100 passenger class modern commercial transport aircraft. The testing and the computation aimed to understand flow physics and then to obtain some guidelines for designing a high performance high-lift system. As a result of the testing, Reynolds number effects within linear region and stall region were observed. Analysis of static pressure distribution and flow visualization gave the knowledge to understand the aerodynamic performance. CFD could capture the whole characteristics of basic aerodynamics and clarify flow mechanism which governs stall characteristics even for complicated geometry and its flow field. This collaborative work between wind tunnel testing and CFD is advantageous for improving or has improved the aerodynamic performance.

  6. Space Shuttle and Launch Pad Computational Fluid Dynamics Model for Lift-off Debris Transport Analysis

    NASA Technical Reports Server (NTRS)

    Dougherty, Sam; West, Jeff; Droege, Alan; Wilson, Josh; Liever, Peter; Slaby, Matthew

    2006-01-01

    This paper discusses the Space Shuttle Lift-off CFD model developed for potential Lift-off Debris transport for return-to-flight. The Lift-off portion of the flight is defined as the time starting with tanking of propellants until tower clear, approximately T0+6 seconds, where interactions with the launch pad cease. A CFD model containing the Space Shuttle and launch Pad geometry has been constructed and executed. Simplifications required in the construction of the model are presented and discussed. A body-fitted overset grid of up to 170 million grid points was developed which allowed positioning of the Vehicle relative to the Launch Pad over the first six seconds of Climb-Out. The CFD model works in conjunction with a debris particle transport model and a debris particle impact damage tolerance model. These models have been used to assess the interactions of the Space Shuttle plumes, the wind environment, and their interactions with each other and the Launch Pad and their ultimate effect on potential debris during Lift-off.

  7. Design, implementation, and application of a microresonator platform for measuring energy dissipation by internal friction in nanowires.

    PubMed

    Das, Kaushik; Sosale, Guruprasad; Vengallatore, Srikar

    2012-12-21

    Accurate measurements of internal friction in nanowires are required for the rational design of high-Q resonators used in nanoelectromechanical systems and for fundamental studies of nanomechanical behavior. However, measuring internal friction is challenging because of the difficulties associated with identifying the contributions of material dissipation to structural damping. Here, we present an approach for overcoming these difficulties by using a composite microresonator platform that is calibrated against the ultimate limits of thermoelastic damping. The platform consists of an array of nanowires patterned at the root of a low-loss single-crystal silicon microcantilever. The structure is processed using a lift-off technique, implemented using electron-beam lithography, to achieve excellent control over the size, alignment, dispersion and location of the nanowire array. As the first application of this platform, we measured internal friction at room temperature in aluminum nanowires that ranged from 50 to 100 nm in thickness and 100 to 400 nm in width. Internal friction is ~0.03 at frequencies of 6.5-21 kHz. Transmission electron microscopy of the nanocrystalline grain structure, and comparison with previously measured values of internal friction in continuous thin films of aluminum, suggest that grain-boundary sliding is a major source of internal friction in these nanowires.

  8. Work-related musculoskeletal risks associated with nurses and nursing assistants handling overweight and obese patients: A literature review.

    PubMed

    Choi, Sang D; Brings, Kathryn

    2015-01-01

    Nurses and nursing assistants are susceptible to work-related musculoskeletal disorders and injuries (WMSDs) due to the increase in overweight and obese patients they are handling on a daily basis. This study aimed to review work-related musculoskeletal hazards and risks associated with handling overweight and obese patients, and summarize the recommended interventions to mitigate musculoskeletal concerns among nurses and nursing assistants. Approximately 350 publications were initially screened and 22 refereed articles were used to synthesize for this study on the bases of inclusion/exclusion relevance and strength of evidence on overweight or obese patient handling. Evidence suggested that the work-related musculoskeletal risks among nurses and nursing assistants included sprains/strains, low back pain, wrist, knee and shoulder injuries. The findings indicated that the WMSD risks increased when nurses and nursing assistants were manually moving or lifting patients, especially when the patients were overweight or obese. The recommended solutions included the lifting/transfer equipment and devices, ergonomic assessments and controls, no-lift policies, and training and education. To alleviate the risk of musculoskeletal disorders and injuries among nurses and nursing assistants handling overweight or obese patients, additional research and development into what safe patient handling interventions suit this growing population needs to be addressed.

  9. Forearm Torque and Lifting Strength: Normative Data.

    PubMed

    Axelsson, Peter; Fredrikson, Per; Nilsson, Anders; Andersson, Jonny K; Kärrholm, Johan

    2018-02-10

    To establish reference values for new methods designed to quantitatively measure forearm torque and lifting strength and to compare these values with grip strength. A total of 499 volunteers, 262 males and 237 females, aged 15 to 85 (mean, 44) years, were tested for lifting strength and forearm torque with the Kern and Baseline dynamometers. These individuals were also tested for grip strength with a Jamar dynamometer. Standardized procedures were used and information about sex, height, weight, hand dominance, and whether their work involved high or low manual strain was collected. Men had approximately 70% higher forearm torque and lifting strength compared with females. Male subjects aged 26 to 35 years and female subjects aged 36 to 45 years showed highest strength values. In patients with dominant right side, 61% to 78% had a higher or equal strength on this side in the different tests performed. In patients with dominant left side, the corresponding proportions varied between 41% and 65%. There was a high correlation between grip strength and forearm torque and lifting strength. Sex, body height, body weight, and age showed a significant correlation to the strength measurements. In a multiple regression model sex, age (entered as linear and squared) could explain 51% to 63% of the total variances of forearm torque strength and 30% to 36% of lifting strength. Reference values for lifting strength and forearm torque to be used in clinical practice were acquired. Grip strength has a high correlation to forearm torque and lifting strength. Sex, age, and height can be used to predict forearm torque and lifting strength. Prediction equations using these variables were generated. Normative data of forearm torque and lifting strength might improve the quality of assessment of wrist and forearm disorders as well as their treatments. Copyright © 2018 American Society for Surgery of the Hand. Published by Elsevier Inc. All rights reserved.

  10. KSC-2009-6895

    NASA Image and Video Library

    2009-12-21

    CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, the seventh tower segment of a new mobile launcher, or ML, being constructed to support the Constellation Program, seems to hover above the ground as it is lifted by crane toward the launcher's growing tower. When completed, the tower will be approximately 345 feet tall and have multiple platforms for personnel access. The construction is under way at the mobile launcher park site area north of Kennedy's Vehicle Assembly Building. The launcher will provide a base to launch the Ares I rocket, designed to transport the Orion crew exploration vehicle, its crew and cargo to low Earth orbit. Its base is being made lighter than space shuttle mobile launcher platforms so the crawler-transporter can pick up the heavier load of the tower and taller rocket. For information on the Ares I, visit http://www.nasa.gov/ares. Photo credit: NASA/Jack Pfaller

  11. KSC-2009-6893

    NASA Image and Video Library

    2009-12-21

    CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, the seventh tower segment of a new mobile launcher, or ML, being constructed to support the Constellation Program, is lifted above the heads of the workers monitoring its ascent to the top of the growing tower. When completed, the tower will be approximately 345 feet tall and have multiple platforms for personnel access. The construction is under way at the mobile launcher park site area north of Kennedy's Vehicle Assembly Building. The launcher will provide a base to launch the Ares I rocket, designed to transport the Orion crew exploration vehicle, its crew and cargo to low Earth orbit. Its base is being made lighter than space shuttle mobile launcher platforms so the crawler-transporter can pick up the heavier load of the tower and taller rocket. For information on the Ares I, visit http://www.nasa.gov/ares. Photo credit: NASA/Jack Pfaller

  12. Experimental and computational investigation of lift-enhancing tabs on a multi-element airfoil

    NASA Technical Reports Server (NTRS)

    Ashby, Dale

    1996-01-01

    An experimental and computational investigation of the effect of lift enhancing tabs on a two-element airfoil was conducted. The objective of the study was to develop an understanding of the flow physics associated with lift enhancing tabs on a multi-element airfoil. A NACA 63(sub 2)-215 ModB airfoil with a 30 percent chord Fowler flap was tested in the NASA Ames 7 by 10 foot wind tunnel. Lift enhancing tabs of various heights were tested on both the main element and the flap for a variety of flap riggings. Computations of the flow over the two-element airfoil were performed using the two-dimensional incompressible Navier-Stokes code INS2D-UP. The computer results predict all of the trends in the experimental data quite well. When the flow over the flap upper surface is attached, tabs mounted at the main element trailing edge (cove tabs) produce very little change in lift. At high flap deflections. however, the flow over the flap is separated and cove tabs produce large increases in lift and corresponding reductions in drag by eliminating the separated flow. Cove tabs permit high flap deflection angles to be achieved and reduce the sensitivity of the airfoil lift to the size of the flap gap. Tabs attached to the flap training edge (flap tabs) are effective at increasing lift without significantly increasing drag. A combination of a cove tab and a flap tab increased the airfoil lift coefficient by 11 percent relative to the highest lift tab coefficient achieved by any baseline configuration at an angle of attack of zero percent and the maximum lift coefficient was increased by more than 3 percent. A simple analytic model based on potential flow was developed to provide a more detailed understanding of how lift enhancing tabs work. The tabs were modeled by a point vortex at the training edge. Sensitivity relationships were derived which provide a mathematical basis for explaining the effects of lift enhancing tabs on a multi-element airfoil. Results of the modeling effort indicate that the dominant effects of the tabs on the pressure distribution of each element of the airfoil can be captured with a potential flow model for cases with no flow separation.

  13. [The epidemiology of musculoskeletal changes due to biomechanical overload of the spine in the manual lifting of patients].

    PubMed

    Bordini, L; De Vito, G; Molteni, G; Boccardi, S

    1999-01-01

    The painful lumbosacral symptoms associated with manual lifting by nursing staff constitutes an increasingly important problem in Occupational Health. This category of workers is in fact particularly exposed to risk situations involving the lumbar region of the spine, due especially to the extreme variability of work on the shift, the nature of what is lifted and not always sufficient knowledge and proper performance of the movements. On the basis of a review of a series of studies made on this topic, it was possible to assess the incidence and prevalence of low back pain in selected populations and identify the postural risk to which nursing staff are exposed at work, stressing also the importance of a correct knowledge of manual lifting techniques, frequency and mode of performing them, and the psychological aspects (perception of the intensity of tasks and osteoarticular strain). It was also observed that the data on painful lumbosacral symptoms were underestimated due to the type of epidemiological investigations carried out (mostly cross-sectional) and that comparison of the data proposed was often difficult due to the different criteria of evaluation used to classify the painful symptoms and also to the various epidemiological parameters used (incidence, cumulative incidence, prevalence).

  14. PHYSICAL THERAPY INTERVENTION FOR A FORMER POWER LIFTER AFTER ARTHROSCOPIC MICROFRACTURE PROCEDURE FOR GRADE IV GLENOHUMERAL CHONDRAL DEFECTS

    PubMed Central

    Sum, Jonathan

    2011-01-01

    Background: Power lifting places the shoulder complex at risk for injury. Microfracture is a relatively new procedure for chondral defects of the glenohumeral joint and is not well described in the literature. Objectives: The purpose of this case report is to describe the post-operative rehabilitation used with a power lifter who underwent a microfracture procedure to address glenoid and humeral chondral defects, debridement of type I superior labral anterior-posterior lesion, and a subacromial decompression. Case Description: The patient was a 46 year-old male who was evaluated nine weeks status-post arthroscopic microfracture procedure for glenoid and humeral chondral defects, debridement of superior labral anterior-posterior (SLAP) lesion, and subacromial decompression. Rehabilitation consisted of postural education, manual therapy, rotator cuff and scapular strengthening, dynamic stabilization, weightbearing exercises, and weight training over nine weeks (24 sessions). Lifting modifications were addressed. Outcomes: Results of the QuickDASH indicate that activities of daily living (ADLs), work, and sports modules all improved significantly, and the patient was able to return to recreational power lifting with limited discomfort or restrictions. Discussion: A structured post-operative physical therapy treatment program allowed this patient to return to recreational power lifting while restoring independent function for work-related activities and ADLs. PMID:21655454

  15. Growth and behavior of chondrocytes on nano engineered surfaces and construction of micropatterned co-culture platforms using layer-by-layer platforms using layer-by-layer assembly lift-off method

    NASA Astrophysics Data System (ADS)

    Shaik, Jameel

    Several approaches such as self-assembled monolayers and layer-by-layer assembled multilayer films are being used as tools to study the interactions of cells with biomaterials in vitro. In this study, the layer-by-layer assembly approach was used to create monolayer, bilayer, trilayer, five, ten and twenty-bilayer beds of eleven different biomaterials. The various biomaterials used were poly(styrene-sulfonate), fibronectin, poly-L-lysine, poly-D-lysine, laminin, bovine serum albumin, chondroitin sulfate, poly(ethyleneimine), polyethylene glycol amine, collagen and poly(dimethyldiallyl-ammonium chloride) with unmodified tissue-culture polystyrene as standard control. Three different cell lines---primary bovine articular chondrocytes, and two secondary cell lines, human chondrosarcoma cells and canine chondrocytes were used in these studies. Chondrocyte morphology and attachment, viability, proliferation, and functionality were determined using bright field microscopy, the Live/Dead viability assay, MTT assay, and immunocytochemistry, respectively. Atomic force microscopy of the nanofilms indicated an increase in surface roughness with increasing number of layers. The most important observations from the studies on primary bovine articular chondrocytes were that these cells exhibited increasing viability and cell metabolic activity with increasing number of bilayers. The increase in viability was more pronounced than the increase in cell metabolic activity. Also, bovine chondrocytes on bilayers of poly(dimethyldiallyl-ammonium chloride, poly-L-lysine, poly(styrene-sulfonate), and bovine serum albumin were substantially bigger in size and well-attached when compared to the cells grown on monolayer and trilayers. Lactate dehydrogenase assay performed on chondrosarcoma cells grown on 5- and 10-bilayer multilayer beds indicated that the 10-bilayer beds had reduced cytotoxicity compared to the 5-bilayer beds. MTT assay performed on canine chondrocytes grown on 5-, 10-, and 20-bilayer nanofilm beds revealed increasing cell metabolic activity for BSA with increasing bilayers. Micropatterned multilayer beds having poly-L-lysine, poly-D-lysine, laminin poly(dimethyldiallyl-ammonium chloride) and poly(ethyleneimine) as the terminating layers were fabricated using the Layer-by-layer Lift-off (LbL-LO) method that combines photolithography and LbL self-assembly. Most importantly, micropatterned co-culture platforms consisting of anti-CD 44 rat monoclonal and anti-rat osteopontin (MPIIIB101) antibodies were constructed using the LbL-LO method for the first time. These co-culture platforms have several applications especially for studies of stem and progenitor cells. Co-culture platforms exhibiting spatiotempora-based differentiation can be built with LbL-LO for the differentiation of stem cells into the desired cell lineage.

  16. Laser-induced forward transfer (LIFT) of congruent voxels

    NASA Astrophysics Data System (ADS)

    Piqué, Alberto; Kim, Heungsoo; Auyeung, Raymond C. Y.; Beniam, Iyoel; Breckenfeld, Eric

    2016-06-01

    Laser-induced forward transfer (LIFT) of functional materials offers unique advantages and capabilities for the rapid prototyping of electronic, optical and sensor elements. The use of LIFT for printing high viscosity metallic nano-inks and nano-pastes can be optimized for the transfer of voxels congruent with the shape of the laser pulse, forming thin film-like structures non-lithographically. These processes are capable of printing patterns with excellent lateral resolution and thickness uniformity typically found in 3-dimensional stacked assemblies, MEMS-like structures and free-standing interconnects. However, in order to achieve congruent voxel transfer with LIFT, the particle size and viscosity of the ink or paste suspensions must be adjusted to minimize variations due to wetting and drying effects. When LIFT is carried out with high-viscosity nano-suspensions, the printed voxel size and shape become controllable parameters, allowing the printing of thin-film like structures whose shape is determined by the spatial distribution of the laser pulse. The result is a new level of parallelization beyond current serial direct-write processes whereby the geometry of each printed voxel can be optimized according to the pattern design. This work shows how LIFT of congruent voxels can be applied to the fabrication of 2D and 3D microstructures by adjusting the viscosity of the nano-suspension and laser transfer parameters.

  17. Advances in Engineering Software for Lift Transportation Systems

    NASA Astrophysics Data System (ADS)

    Kazakoff, Alexander Borisoff

    2012-03-01

    In this paper an attempt is performed at computer modelling of ropeway ski lift systems. The logic in these systems is based on a travel form between the two terminals, which operates with high capacity cabins, chairs, gondolas or draw-bars. Computer codes AUTOCAD, MATLAB and Compaq-Visual Fortran - version 6.6 are used in the computer modelling. The rope systems computer modelling is organized in two stages in this paper. The first stage is organization of the ground relief profile and a design of the lift system as a whole, according to the terrain profile and the climatic and atmospheric conditions. The ground profile is prepared by the geodesists and is presented in an AUTOCAD view. The next step is the design of the lift itself which is performed by programmes using the computer code MATLAB. The second stage of the computer modelling is performed after the optimization of the co-ordinates and the lift profile using the computer code MATLAB. Then the co-ordinates and the parameters are inserted into a program written in Compaq Visual Fortran - version 6.6., which calculates 171 lift parameters, organized in 42 tables. The objective of the work presented in this paper is an attempt at computer modelling of the design and parameters derivation of the rope way systems and their computer variation and optimization.

  18. Strain on the back in concrete reinforcement work.

    PubMed Central

    Wickström, G; Niskanen, T; Riihimäki, H

    1985-01-01

    To investigate the long term effect of heavy construction work on the back the occurrence of postures, lifting, carrying, and accidents in concrete reinforcement work and in maintenance house painting were measured. The 32 620 observations covering 272 work hours showed that reinforcement work necessitated stooped postures and heavy lifting more often than did painting. Reported minor back accidents were more than ten times as common in reinforcement work than in painting (1.3 compared with 0.11 accidents per man-year, p less than 0.001). Accidents of the musculoskeletal system, registered by the insurance companies, were also several times more common in reinforcement work (81 compared with 25 per 1000 man-years, p less than 0.001). The premature development of lumbar degeneration detected in the clinical study of the reinforcement workers was evidently due to the occupational strain on the back. The different types of hazardous back loads probably potentiate the effects of each other. PMID:3978042

  19. Working height, block mass and one- vs. two-handed block handling: the contribution to low back and shoulder loading during masonry work.

    PubMed

    Faber, G S; Kingma, I; Kuijer, P P F M; van der Molen, H F; Hoozemans, M J M; Frings-Dresen, M H W; van Dieën, J H

    2009-09-01

    The goal of this study was to compare the effects of the task variables block mass, working height and one- vs. two-handed block handling on low back and shoulder loading during masonry work. In a mock-up of a masonry work site, nine masonry workers performed one- and two-handed block-lifting and block-placing tasks at varying heights (ranging from floor to shoulder level) with blocks of varying mass (ranging from 6 to 16 kg). Kinematics and ground reaction forces were measured and used in a 3-D linked segment model to calculate low back and shoulder loading. Increasing lifting height appeared to be the most effective way to reduce low back loading. However, working at shoulder level resulted in relatively high shoulder loading. Therefore, it was recommended to organise masonry work in such a way that blocks are handled with the hands at about iliac crest height as much as possible.

  20. KSC-2014-2480

    NASA Image and Video Library

    2014-05-01

    VANDENBERG AIR FORCE BASE, Calif. – In the Astrotech payload processing facility on Vandenberg Air Force Base in California, Orbital Sciences workers and technicians move their work platforms away from NASA's Orbiting Carbon Observatory-2, or OCO-2, in preparation for its lift from the transportation trailer. Testing and launch preparations now will get underway for its launch from Space Launch Complex 2 aboard a United Launch Alliance Delta II rocket, scheduled for July 1, 2014. The observatory will collect precise global measurements of carbon dioxide in the Earth's atmosphere and provide scientists with a better idea of the chemical compound's impacts on climate change. Scientists will analyze this data to improve our understanding of the natural processes and human activities that regulate the abundance and distribution of this important atmospheric gas. OCO-2 is a NASA Earth System Science Pathfinder Program mission managed by NASA's Jet Propulsion Laboratory JPL in Pasadena, California, for NASA's Science Mission Directorate in Washington. Orbital Sciences built the spacecraft and provides mission operations under JPL’s leadership. To learn more about OCO-2, visit http://oco.jpl.nasa.gov. Photo credit: NASA/Doug Gruben, 30th Space Wing

  1. KSC-98pc1192

    NASA Image and Video Library

    1998-09-30

    KENNEDY SPACE CENTER, FLA. -- Deep Space 1 is lifted from its work platform, giving a closeup view of the experimental solar-powered ion propulsion engine. The ion propulsion engine is the first non-chemical propulsion to be used as the primary means of propelling a spacecraft. The first flight in NASA's New Millennium Program, Deep Space 1 is designed to validate 12 new technologies for scientific space missions of the next century. Another onboard experiment includes software that tracks celestial bodies so the spacecraft can make its own navigation decisions without the intervention of ground controllers. Deep Space 1 will complete most of its mission objectives within the first two months, but may also do a flyby of a near-Earth asteroid, 1992 KD, in July 1999. Deep Space 1 will be launched aboard a Boeing Delta 7326 rocket from Launch Pad 17A, Cape Canaveral Air Station, in October. Delta II rockets are medium capacity expendable launch vehicles derived from the Delta family of rockets built and launched since 1960. Since then there have been more than 245 Delta launches

  2. Deep Space 1 Ion Engine

    NASA Image and Video Library

    2002-12-21

    Kennedy Space Center, Florida. - Deep Space 1 is lifted from its work platform, giving a closeup view of the experimental solar-powered ion propulsion engine. The ion propulsion engine is the first non-chemical propulsion to be used as the primary means of propelling a spacecraft. The first flight in NASA's New Millennium Program, Deep Space 1 is designed to validate 12 new technologies for scientific space missions of the next century. Another onboard experiment includes software that tracks celestial bodies so the spacecraft can make its own navigation decisions without the intervention of ground controllers. Deep Space 1 will complete most of its mission objectives within the first two months, but may also do a flyby of a near-Earth asteroid, 1992 KD, in July 1999. Deep Space 1 will be launched aboard a Boeing Delta 7326 rocket from Launch Pad 17A, Cape Canaveral Air Station, in October. Delta II rockets are medium capacity expendable launch vehicles derived from the Delta family of rockets built and launched since 1960. Since then there have been more than 245 Delta launches. http://photojournal.jpl.nasa.gov/catalog/PIA04232

  3. Efficiency of overhead ceiling lifts in reducing musculoskeletal injury among carers working in long-term care institutions.

    PubMed

    Alamgir, Hasanat; Yu, Shicheng; Fast, Catherine; Hennessy, Stephanie; Kidd, Catherine; Yassi, Annalee

    2008-05-01

    A longitudinal study was conducted in three long-term care facilities to evaluate the effectiveness and cost benefit of overhead lifts in reducing the risk of musculoskeletal injury among healthcare workers. Analysis of injury trends spanning 6 years before intervention (1996-2001) and 4 years after intervention (2002-2005) found a significant and sustained decrease in workers' compensation claims per number of beds and in working days lost per bed. The payback period was estimated under various assumptions and varied from 6.3 to 6.2 years if only direct claim-cost savings were included, and from 2.06 to 3.20 years when indirect savings were added. The significant reductions in injury rates and compensation claims support intervention with overhead ceiling lifts. A more comprehensive evaluation of such programmes should incorporate in the analysis important variables such as staffing ratios, job stresses, injury reporting systems and compensation policies during the study period.

  4. Zero-moment point determination of worst-case manoeuvres leading to vehicle wheel lift

    NASA Astrophysics Data System (ADS)

    Lapapong, S.; Brown, A. A.; Swanson, K. S.; Brennan, S. N.

    2012-01-01

    This paper proposes a method to evaluate vehicle rollover propensity based on a frequency-domain representation of the zero-moment point (ZMP). Unlike other rollover metrics such as the static stability factor, which is based on the steady-state behaviour, and the load transfer ratio, which requires the calculation of tyre forces, the ZMP is based on a simplified kinematic model of the vehicle and the analysis of the contact point of the vehicle relative to the edge of the support polygon. Previous work has validated the use of the ZMP experimentally in its ability to predict wheel lift in the time domain. This work explores the use of the ZMP in the frequency domain to allow a chassis designer to understand how operating conditions and vehicle parameters affect rollover propensity. The ZMP analysis is then extended to calculate worst-case sinusoidal manoeuvres that lead to untripped wheel lift, and the analysis is tested across several vehicle configurations and compared with that of the standard Toyota J manoeuvre.

  5. Icing Test Results on an Advanced Two-Dimensional High-Lift Multi-Element Airfoil

    NASA Technical Reports Server (NTRS)

    Shin, Jaiwon; Wilcox, Peter; Chin, Vincent; Sheldon, David

    1994-01-01

    An experimental study has been conducted to investigate ice accretions on a high-lift, multi-element airfoil in the Icing Research Tunnel at the NASA Lewis Research Center. The airfoil is representative of an advanced transport wing design. The experimental work was conducted as part of a cooperative program between McDonnell Douglas Aerospace and the NASA Lewis Research Center to improve current understanding of ice accretion characteristics on the multi-element airfoil. The experimental effort also provided ice shapes for future aerodynamic tests at flight Reynolds numbers to ascertain high-lift performance effects. Ice shapes documented for a landing configuration over a variety of icing conditions are presented along with analyses.

  6. LIFT Tenant Is Off and Running

    NASA Technical Reports Server (NTRS)

    Steele, Gynelle C.

    2001-01-01

    Lewis Incubator for Technology (LIFT) tenant, Analiza Inc., graduated from the incubator July 2000. Analiza develops technology and products for the early diagnosis of diseases, quality control of bio-pharmaceutical therapeutics, and other applications involving protein analyses. Technology links with NASA from existing and planned work are in areas of microfluidics and laser light scattering. Since their entry in LIFT in May, 1997, Analiza has: Received a $750,000 grant from the National Institutes of Health. Collaborated with a Nobel Prize winner on drug design. Collaborated with Bristol-Myers Squibb on the characterization of biological therapeutics. Added a Ph.D. senior scientist and several technicians. Received significant interest from major pharmaceutical companies about collaborating and acquiring Analiza technology.

  7. A potential method for lift evaluation from velocity field data

    NASA Astrophysics Data System (ADS)

    de Guyon-Crozier, Guillaume; Mulleners, Karen

    2017-11-01

    Computing forces from velocity field measurements is one of the challenges in experimental aerodynamics. This work focuses on low Reynolds flows, where the dynamics of the leading and trailing edge vortices play a major role in lift production. Recent developments in 2D potential flow theory, using discrete vortex models, have shown good results for unsteady wing motions. A method is presented to calculate lift from experimental velocity field data using a discrete vortex potential flow model. The model continuously adds new point vortices at leading and trailing edges whose circulations are set directly from vorticity measurements. Forces are computed using the unsteady Blasius equation and compared with measured loads.

  8. Musculoskeletal injuries resulting from patient handling tasks among hospital workers.

    PubMed

    Pompeii, Lisa A; Lipscomb, Hester J; Schoenfisch, Ashley L; Dement, John M

    2009-07-01

    The purpose of this study was to evaluate musculoskeletal injuries and disorders resulting from patient handling prior to the implementation of a "minimal manual lift" policy at a large tertiary care medical center. We sought to define the circumstances surrounding patient handling injuries and to identify potential preventive measures. Human resources data were used to define the cohort and their time at work. Workers' compensation records (1997-2003) were utilized to identify work-related musculoskeletal claims, while the workers' description of injury was used to identify those that resulted from patient handling. Adjusted rate ratios were generated using Poisson regression. One-third (n = 876) of all musculoskeletal injuries resulted from patient handling activities. Most (83%) of the injury burden was incurred by inpatient nurses, nurses' aides and radiology technicians, while injury rates were highest for nurses' aides (8.8/100 full-time equivalent, FTEs) and smaller workgroups including emergency medical technicians (10.3/100 FTEs), patient transporters (4.3/100 FTEs), operating room technicians (3.1/100 FTEs), and morgue technicians (2.2/100 FTEs). Forty percent of injuries due to lifting/transferring patients may have been prevented through the use of mechanical lift equipment, while 32% of injuries resulting from repositioning/turning patients, pulling patients up in bed, or catching falling patients may not have been prevented by the use of lift equipment. The use of mechanical lift equipment could significantly reduce the risk of some patient handling injuries but additional interventions need to be considered that address other patient handling tasks. Smaller high-risk workgroups should not be neglected in prevention efforts.

  9. Peer coaching and mentoring: a new model of educational intervention for safe patient handling in health care.

    PubMed

    Alamgir, Hasanat; Drebit, Sharla; Li, Helen Guiyun; Kidd, Catherine; Tam, Helen; Fast, Catherine

    2011-08-01

    To reduce the risk of patient handling-related musculoskeletal injury, overhead ceiling lifts have been installed in health care facilities. To increase ceiling lift usage for a variety of patient handling tasks, a peer coaching and mentoring program was implemented among the direct care staff in the long-term care subsector in British Columbia, Canada. They received a 4-day training program on body mechanics, ergonomics, patient-handling techniques, ceiling lift usage, in addition to coaching skills. A questionnaire was administered among staff before and after the intervention to evaluate the program's effectiveness. There were 403 and 200 respondents to the pre-intervention and post-intervention questionnaires. In general, staff perceived the peer-coaching program to be effective. The number of staff who reported to be using ceiling lifts "often and always" went higher from 64.5% to 80.5% (<0.001) after coaching program implementation. Furthermore, staff reported that they were using the ceiling lifts for more types of tasks post-intervention. Staff reported that the peer coaching program has increased their safety awareness at work and confidence in using the ceiling lifts. The findings suggest that this educational model can increase the uptake of mechanical interventions for occupational health and safety initiatives. It appears that the training led to a greater awareness of the availability of or increased perceptions of the number of ceiling lifts, presumably through coaches advocating their use. Copyright © 2011 Wiley-Liss, Inc.

  10. Automation of workplace lifting hazard assessment for musculoskeletal injury prevention.

    PubMed

    Spector, June T; Lieblich, Max; Bao, Stephen; McQuade, Kevin; Hughes, Margaret

    2014-01-01

    Existing methods for practically evaluating musculoskeletal exposures such as posture and repetition in workplace settings have limitations. We aimed to automate the estimation of parameters in the revised United States National Institute for Occupational Safety and Health (NIOSH) lifting equation, a standard manual observational tool used to evaluate back injury risk related to lifting in workplace settings, using depth camera (Microsoft Kinect) and skeleton algorithm technology. A large dataset (approximately 22,000 frames, derived from six subjects) of simultaneous lifting and other motions recorded in a laboratory setting using the Kinect (Microsoft Corporation, Redmond, Washington, United States) and a standard optical motion capture system (Qualysis, Qualysis Motion Capture Systems, Qualysis AB, Sweden) was assembled. Error-correction regression models were developed to improve the accuracy of NIOSH lifting equation parameters estimated from the Kinect skeleton. Kinect-Qualysis errors were modelled using gradient boosted regression trees with a Huber loss function. Models were trained on data from all but one subject and tested on the excluded subject. Finally, models were tested on three lifting trials performed by subjects not involved in the generation of the model-building dataset. Error-correction appears to produce estimates for NIOSH lifting equation parameters that are more accurate than those derived from the Microsoft Kinect algorithm alone. Our error-correction models substantially decreased the variance of parameter errors. In general, the Kinect underestimated parameters, and modelling reduced this bias, particularly for more biased estimates. Use of the raw Kinect skeleton model tended to result in falsely high safe recommended weight limits of loads, whereas error-corrected models gave more conservative, protective estimates. Our results suggest that it may be possible to produce reasonable estimates of posture and temporal elements of tasks such as task frequency in an automated fashion, although these findings should be confirmed in a larger study. Further work is needed to incorporate force assessments and address workplace feasibility challenges. We anticipate that this approach could ultimately be used to perform large-scale musculoskeletal exposure assessment not only for research but also to provide real-time feedback to workers and employers during work method improvement activities and employee training.

  11. The 1 Repetition Maximum Mechanics of a High-Handle Hexagonal Bar Deadlift Compared With a Conventional Deadlift as Measured by a Linear Position Transducer.

    PubMed

    Lockie, Robert G; Moreno, Matthew R; Lazar, Adrina; Risso, Fabrice G; Liu, Tricia M; Stage, Alyssa A; Birmingham-Babauta, Samantha A; Torne, Ibett A; Stokes, John J; Giuliano, Dominic V; Davis, DeShaun L; Orjalo, Ashley J; Callaghan, Samuel J

    2018-01-01

    Lockie, RG, Moreno, MR, Lazar, A, Risso, FG, Liu, TM, Stage, AA, Birmingham-Babauta, SA, Torne, IA, Stokes, JJ, Giuliano, DV, Davis, DL, Orjalo, AJ, and Callaghan, SJ. The 1 repetition maximum mechanics of a high-handle hexagonal bar deadlift compared with a conventional deadlift as measured by a linear position transducer. J Strength Cond Res 32(1): 150-161, 2018-The high-handle hexagonal bar deadlift (HHBD), a variation of the conventional deadlift (CD), is said to reduce the lift range of motion, which may change the mechanics of the lift. However, no research has investigated this. This study compared the mechanics between a 1 repetition maximum (1RM) CD and HHBD. Thirty-one strength-trained subjects (21 men, 10 women) completed a 1RM CD and HHBD. A linear position transducer measured lift distance, duration, and work; and peak and mean power, velocity, and force. The presence of a sticking region (SR) was determined for each lift. A repeated-measures analysis of variance (ANOVA) calculated differences between 1RM CD and HHBD mechanics. A one-way ANOVA compared the mechanics of each lift between subjects who exhibited an SR or not, and the SR between the CD and HHBD. Significance was set at p < 0.01. Subjects lifted a greater load in the HHBD (154.50 ± 45.29 kg) compared with the CD (134.72 ± 40.63 kg). Lift distance and duration were 22 and 25% shorter during the 1RM HHBD, respectively. The HHBD featured greater peak power and velocity, and peak and mean force; more work was done in the CD. Most subjects did not exhibit a CD (68%) or HHBD (77%) SR. There were no differences in CD or HHBD mechanics between subjects with or without an SR, and no differences in SR region distance or duration between the CD and HHBD. Greater force can be generated in the HHBD, which could have implications for strength-training adaptations over time.

  12. Physical activity level at work and risk of chronic low back pain: A follow-up in the Nord-Trøndelag Health Study.

    PubMed

    Heuch, Ingrid; Heuch, Ivar; Hagen, Knut; Zwart, John-Anker

    2017-01-01

    Physical activity in leisure time seems to reduce the risk of low back pain, but it is not known whether occupational activity, as recorded in a representative working population, produces a higher or lower risk. To study associations between physical activity level at work and risk of chronic low back pain. Associations were examined in a Norwegian prospective study using data from the HUNT2 and HUNT3 surveys carried out in the whole county of Nord-Trøndelag. Participants were 7580 women and 7335 men who supplied information about physical activity level at work. Levels considered were sedentary work, work involving walking but no heavy lifting, work involving walking and heavy lifting, and particularly strenuous physical work. Nobody in the cohort was affected by chronic low back pain at baseline. After 11 years, participants reported whether they suffered from chronic low back pain. Generalized linear modelling with adjustment for potential confounders was applied to assess associations with risk factors. In age-adjusted analyses both women and men showed statistically significant associations between physical activity at work and risk of chronic low back pain, suggesting positive relationships. For particularly strenuous physical work the relative risk of chronic low back pain was 1.30 (95% CI: 1.00-1.71) in women and 1.36 (95% CI 1.17-1.59) in men, compared to sedentary work. Women still showed a general association with activity level after adjustment for education, leisure time physical activity, BMI, smoking and occupational category. In men, the higher risk was only maintained for particularly strenuous work. In this cohort, women had a higher risk of chronic low back pain with work involving walking and heavy lifting or particularly strenuous work, compared to sedentary work. Men participating in particularly strenuous work also experienced a higher risk of chronic low back pain.

  13. A Biomechanical Analysis of the Effects of Bouncing the Barbell in the Conventional Deadlift.

    PubMed

    Krajewski, Kellen; LeFavi, Robert; Riemann, Bryan

    2018-02-27

    The purpose of this study is to analyze biomechanical differences between the bounce and pause styles of deadlifting. Twenty physically active males performed deadlifts at their 75% one repetition maximum testing utilizing both pause and bounce techniques in a within-subjects randomized study design. The average peak height the barbell attained from the three bounce style repetitions was used to compute a compatible phase for analysis of the pause style repetitions. Net joint moment impulse (NJMI), work, average vertical ground reaction force (vGRF), vGRF impulse and phase time were computed for two phases, lift off to peak barbell height and the entire ascent. Additionally, the ankle, knee, hip, and trunk angles at the location of peak barbell height. During the lift off to peak barbell height phase, although each of the joints demonstrated significantly less NJMI and work during the bounce style, the hip joint was impacted the most. The average vGRF was greater for the bounce however the vGRF impulse was greater for the pause. The NJMI results for the ascent phase were similar to the lift off to peak barbell height phase, while work was significantly less for the bounce condition compared to the pause condition across all three joints. Strength and conditioning specialists utilizing the deadlift should be aware that the bounce technique does not allow the athlete to develop maximal force production in the early portion of the lift. Further analyses should focus on joint angles and potential vulnerability to injury when the barbell momentum generated from the bounce is lost.

  14. Report of the Working Group on Large-Scale Computing in Aeronautics.

    DTIC Science & Technology

    1984-06-01

    incompressible approximations that are presently made in the lifting line or lifting surface representations of rotor blades. Finally, viscous effects in the forms... Effects of Rotor Model Degradation in the Accuracy of Rotocraft Real-Time Simulation, NASA TN D-8378;1977. 20. Gullen, R. K., Cattell, C. S., and Overton...assistance to member nations for the purpose of increasing their scientific and technical potential; - Recommending effective ways for the member nations

  15. Experimental and Computational Investigation of Lift-Enhancing Tabs on a Multi-Element Airfoil

    NASA Technical Reports Server (NTRS)

    Ashby, Dale L.

    1996-01-01

    An experimental and computational investigation of the effect of lift-enhancing tabs on a two-element airfoil has been conducted. The objective of the study was to develop an understanding of the flow physics associated with lift-enhancing tabs on a multi-element airfoil. An NACA 63(2)-215 ModB airfoil with a 30% chord fowler flap was tested in the NASA Ames 7- by 10-Foot Wind Tunnel. Lift-enhancing tabs of various heights were tested on both the main element and the flap for a variety of flap riggings. A combination of tabs located at the main element and flap trailing edges increased the airfoil lift coefficient by 11% relative to the highest lift coefficient achieved by any baseline configuration at an angle of attack of 0 deg, and C(sub 1max) was increased by 3%. Computations of the flow over the two-element airfoil were performed using the two-dimensional incompressible Navier-Stokes code INS2D-UP. The computed results predicted all of the trends observed in the experimental data quite well. In addition, a simple analytic model based on potential flow was developed to provide a more detailed understanding of how lift-enhancing tabs work. The tabs were modeled by a point vortex at the air-foil or flap trailing edge. Sensitivity relationships were derived which provide a mathematical basis for explaining the effects of lift-enhancing tabs on a multi-element airfoil. Results of the modeling effort indicate that the dominant effects of the tabs on the pressure distribution of each element of the airfoil can be captured with a potential flow model for cases with no flow separation.

  16. Kinematic analysis of the snatch lift with elite female weightlifters during the 2010 World Weightlifting Championship.

    PubMed

    Akkuş, Hasan

    2012-04-01

    The objectives of this study were to determine the mechanical work, the power output, and the angular kinematics of the lower limb and the linear kinematics of the barbell during the first and second pulls in the snatch lift event of the 2010 Women's World Weightlifting Championship, an Olympic qualifying competition, and to compare the snatch performances of the women weightlifters to those reported in the literature. The heaviest successful snatch lifts of 7 female weightlifters who won gold medals were analyzed. The snatch lifts were recorded using 2 Super-Video Home System cameras (50 fields·s), and points on the body and the barbell were manually digitized using the Ariel Performance Analysis System. The results revealed that the duration of the first pull was significantly greater than the duration of the transition phase, the second pull, and the turnover under the barbell (p < 0.05). The maximum extension velocities of the lower limb in the second pull were significantly greater than the maximum extension velocities in the first pull. The fastest extensions were observed at the knee joint during the first pull and at the hip joint during the second pull (p < 0.05). The barbell trajectories for the heaviest snatch lifts of these elite female weightlifters were similar to those of men. The maximum vertical velocity of the barbell was greater during the second pull than in the first pull (p < 0.05). The mechanical work performed in the first pull was greater than the second pull, and the power output during the second pull was greater than that of the first pull (p < 0.05). Although the magnitudes of the barbell's linear kinematics, the angular kinematics of the lower limb, and other energy characteristics did not exactly reflect those reported in the literature, the snatch lift patterns of the elite women weightlifters were similar to those of male weightlifters.

  17. Shouldering the load: A review of Joan Stevenson's work on occupational lifting and design evaluation of load carriage equipment.

    PubMed

    Costigan, Patrick A; Morin, Evelyn L; Reid, Susan A

    2014-01-01

    In this paper, Dr. Joan Stevenson's work on assessment of the effects of lifting, supporting and transporting loads is reviewed. A defining attribute of this work is the use of objective, biomechanical measures as the basis from which a fuller understanding of all factors affecting worker performance can be obtained, and how such performance should be measured and evaluated. The central objectives and conclusions of Dr. Stevenson's research programs spanning the years from 1985 through 2012 are summarized and discussed in terms of an overall research trajectory. The guiding principle of Dr. Stevenson's work is to reduce the potential harm to which workers are exposed through the development of bona fide occupational standards, a better understanding of risk factors leading to low back pain, and the establishment of an enhanced objective design process for functional load-bearing clothing and equipment.

  18. Scaling of Lift Degradation Due to Anti-Icing Fluids Based Upon the Aerodynamic Acceptance Test

    NASA Technical Reports Server (NTRS)

    Broeren, Andy P.; Riley, James T.

    2012-01-01

    In recent years, the FAA has worked with Transport Canada, National Research Council Canada (NRC) and APS Aviation, Inc. to develop allowance times for aircraft operations in ice-pellet precipitation. These allowance times are critical to ensure safety and efficient operation of commercial and cargo flights. Wind-tunnel testing with uncontaminated anti-icing fluids and fluids contaminated with simulated ice pellets had been carried out at the NRC Propulsion and Icing Wind Tunnel (PIWT) to better understand the flowoff characteristics and resulting aerodynamic effects. The percent lift loss on the thin, high-performance wing model tested in the PIWT was determined at 8 angle of attack and used as one of the evaluation criteria in determining the allowance times. Because it was unclear as to how performance degradations measured on this model were relevant to an actual airplane configuration, some means of interpreting the wing model lift loss was deemed necessary. This paper describes how the lift loss was related to the loss in maximum lift of a Boeing 737-200ADV airplane through the Aerodynamic Acceptance Test (AAT) performed for fluids qualification. A loss in maximum lift coefficient of 5.24 percent on the B737-200ADV airplane (which was adopted as the threshold in the AAT) corresponds to a lift loss of 7.3 percent on the PIWT model at 8 angle of attack. There is significant scatter in the data used to develop the correlation related to varying effects of the anti-icing fluids that were tested and other factors. A statistical analysis indicated the upper limit of lift loss on the PIWT model was 9.2 percent. Therefore, for cases resulting in PIWT model lift loss from 7.3 to 9.2 percent, extra scrutiny of the visual observations is required in evaluating fluid performance with contamination.

  19. Scaling of Lift Degradation Due to Anti-Icing Fluids Based Upon the Aerodynamic Acceptance Test

    NASA Technical Reports Server (NTRS)

    Broeren, Andy; Riley, Jim

    2012-01-01

    In recent years, the FAA has worked with Transport Canada, National Research Council Canada (NRC) and APS Aviation, Inc. to develop allowance times for aircraft operations in ice-pellet precipitation. These allowance times are critical to ensure safety and efficient operation of commercial and cargo flights. Wind-tunnel testing with uncontaminated anti-icing fluids and fluids contaminated with simulated ice pellets had been carried out at the NRC Propulsion and Icing Wind Tunnel (PIWT) to better understand the flow-off characteristics and resulting aerodynamic effects. The percent lift loss on the thin, high-performance wing model tested in the PIWT was determined at 8 deg. angle of attack and used as one of the evaluation criteria in determining the allowance times. Because it was unclear as to how performance degradations measured on this model were relevant to an actual airplane configuration, some means of interpreting the wing model lift loss was deemed necessary. This paper describes how the lift loss was related to the loss in maximum lift of a Boeing 737-200ADV airplane through the Aerodynamic Acceptance Test (AAT) performed for fluids qualification. A loss in maximum lift coefficient of 5.24% on the B737-200ADV airplane (which was adopted as the threshold in the AAT) corresponds to a lift loss of 7.3% on the PIWT model at 8 deg. angle of attack. There is significant scatter in the data used to develop the correlation related to varying effects of the anti-icing fluids that were tested and other factors. A statistical analysis indicated the upper limit of lift loss on the PIWT model was 9.2%. Therefore, for cases resulting in PIWT model lift loss from 7.3% to 9.2%, extra scrutiny of the visual observations is required in evaluating fluid performance with contamination.

  20. A national cross-sectional study in the Danish wood and furniture industry on working postures and manual materials handling.

    PubMed

    Christensen, H; Pedersen, M B; Sjøgaard, G

    1995-04-01

    Musculoskeletal disorders constitute a major problem in the wood and furniture industry and identification of risk factors is needed urgently. Therefore, exposures to different work tasks and variation in the job were recorded based on an observation survey in combination with an interview among 281 employees working in wood working and painting departments. A questionnaire survey confirmed high frequencies of symptoms from the musculoskeletal system: The one-year prevalence of symptoms from the low back was 42% and symptoms from the neck/shoulder was 40%. The exposure was evaluated based on: (1) classification of work tasks, (2) work cycle time, (3) manual materials handling, (4) working postures, and (5) variation in the job. Among the employees 47% performed feeding or clearing of machines, 35% performed wood working or painting materials, and 18% performed various other operations. Among the employees 20% had no variation in their job while 44% had little variation. Manual materials handling of 375 different burdens was observed, which most often occurred during feeding or clearing of machines. The weight of burdens lifted was 0.5-87.0 kg, where 2% had a weight of more than 50 kg. Among the lifting conditions 30% were evaluated as implying a risk of injury. An additional risk factor was the high total tonnage lifted per day, which was estimated to range from 132 kg to 58,800 kg. Working postures implied a risk of injury due to prolonged forward and lateral flexions of the neck, which was seen most frequently during wood working or painting materials. These data substantiate the finding that work tasks mainly during feeding or clearing of machines imply a risk of injury to the low back and a risk of injury to the neck and shoulder area mainly during wood working or painting materials. Optimal strategies for job redesign may be worked out by using these data in order to prevent occupational musculoskeletal disorders.

  1. 20 CFR 220.102 - Non-severe impairment(s), defined.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... significantly limit the claimant's physical or mental ability to do basic work activities. (b) Basic work activities. Basic work activities means the ability and aptitudes necessary to do most jobs. Examples of these include— (1) Physical functions such as walking, standing, sitting, lifting, pushing, pulling...

  2. Stretch shorten cycle performance enhancement through flexibility training.

    PubMed

    Wilson, G J; Elliott, B C; Wood, G A

    1992-01-01

    Sixteen experienced male powerlifters served as subjects in a training study designed to examine the effect of flexibility training on: (i) the stiffness of the series elastic components (SEC) of the upper body musculature and (ii) rebound and purely concentric bench press performance. Nine of the subjects participated in two sessions of flexibility training twice per week for 8 wk. Prior to and after the training period the subjects' static flexibility, SEC stiffness, rebound bench press (RBP), and purely concentric bench press (PCBP) performance were recorded. The flexibility training induced a significant reduction in the maximal stiffness of the SEC. Furthermore, the experimental subjects produced significantly more work during the initial concentric portion of the RBP lift, enabling a significantly greater load to be lifted in the post-training testing occasion. The benefits to performance achieved by the experimental group consequent to flexibility training were greater during the RBP lift as compared with the PCBP lift. The control subjects exhibited no change in any variable over the training period. These results implied that the RBP performance enhancement observed consequent to flexibility training was directly caused by a reduction in SEC stiffness, increasing the utilization of elastic strain energy during the RBP lift.

  3. Outperforming hummingbirds' load-lifting capability with a lightweight hummingbird-like flapping-wing mechanism.

    PubMed

    Leys, Frederik; Reynaerts, Dominiek; Vandepitte, Dirk

    2016-08-15

    The stroke-cam flapping mechanism presented in this paper closely mimics the wing motion of a hovering Rufous hummingbird. It is the only lightweight hummingbird-sized flapping mechanism which generates a harmonic wing stroke with both a high flapping frequency and a large stroke amplitude. Experiments on a lightweight prototype of this stroke-cam mechanism on a 50 mm-long wing demonstrate that a harmonic stroke motion is generated with a peak-to-peak stroke amplitude of 175° at a flapping frequency of 40 Hz. It generated a mass lifting capability of 5.1 g, which is largely sufficient to lift the prototype's mass of 3.39 g and larger than the mass-lifting capability of a Rufous hummingbird. The motor mass of a hummingbird-like robot which drives the stroke-cam mechanism is considerably larger (about five times) than the muscle mass of a hummingbird with comparable load-lifting capability. This paper presents a flapping wing nano aerial vehicle which is designed to possess the same lift- and thrust-generating principles of the Rufous hummingbird. The application is indoor flight. We give an overview of the wing kinematics and some specifications which should be met to develop an artificial wing, and also describe the applications of these in the mechanism which has been developed in this work. © 2016. Published by The Company of Biologists Ltd.

  4. Outperforming hummingbirds’ load-lifting capability with a lightweight hummingbird-like flapping-wing mechanism

    PubMed Central

    Reynaerts, Dominiek; Vandepitte, Dirk

    2016-01-01

    ABSTRACT The stroke-cam flapping mechanism presented in this paper closely mimics the wing motion of a hovering Rufous hummingbird. It is the only lightweight hummingbird-sized flapping mechanism which generates a harmonic wing stroke with both a high flapping frequency and a large stroke amplitude. Experiments on a lightweight prototype of this stroke-cam mechanism on a 50 mm-long wing demonstrate that a harmonic stroke motion is generated with a peak-to-peak stroke amplitude of 175° at a flapping frequency of 40 Hz. It generated a mass lifting capability of 5.1 g, which is largely sufficient to lift the prototype's mass of 3.39 g and larger than the mass-lifting capability of a Rufous hummingbird. The motor mass of a hummingbird-like robot which drives the stroke-cam mechanism is considerably larger (about five times) than the muscle mass of a hummingbird with comparable load-lifting capability. This paper presents a flapping wing nano aerial vehicle which is designed to possess the same lift- and thrust-generating principles of the Rufous hummingbird. The application is indoor flight. We give an overview of the wing kinematics and some specifications which should be met to develop an artificial wing, and also describe the applications of these in the mechanism which has been developed in this work. PMID:27444790

  5. Hang Them High: A Hands-Free Technique for Upper Extremity Limb Holding During Surgical Preparation.

    PubMed

    Aneja, Arun; Leung, Patrick; Marquez-Lara, Alejandro

    Lifting and holding upper and lower limbs during the "prep and drape" portion of certain orthopaedic procedures exert strong forces on the holder and may lead to musculoskeletal disorders. To address these challenges during upper extremity procedures, this article describes a hand-free elevation and traction technique of the upper limbs during preoperative skin preparation with the use of items readily available within the operating room (OR). This technique is particularly useful for heavy or fractured limbs that may impose a physical challenge to lift and maintain in a stable position. Implementation of this technique reduces the risk to nurses, OR personnel, and caregivers of developing work-related musculoskeletal injuries while lifting and holding limbs in the orthopaedic OR.

  6. KSC-05PD-1142

    NASA Technical Reports Server (NTRS)

    2005-01-01

    KENNEDY SPACE CENTER, FLA. Under post-dawn cloudy skies, Space Shuttle Discovery, resting on the Mobile Launcher Platform, rolls away from Launch Pad 39B via the Crawler/Transporter underneath. At left are the Rotating and Fixed Service Structures (RSS and FSS). Atop the FSS is the 80-foot lightning mast. At right is the 290-foot-tall water tower that holds 300,000 gallons of water, part of the sound suppression system during a launch. Discovery is returning to the Vehicle Assembly Buildling where it will be demated from its External Tank and lifted into the transfer aisle. On or about June 7, Discovery will be lifted and attached to its new tank and Solid Rocket Boosters, which are already in the VAB. Only the 15th rollback in Space Shuttle Program history, the 4.2-mile journey allows additional modifications to be made to the External Tank prior to a safe Return to Flight. Discovery is expected to be rolled back to the launch pad in mid-June for Return to Flight mission STS-114. The launch window extends from July 13 to July 31.

  7. Space Shuttle Discovery lifts off successfully

    NASA Technical Reports Server (NTRS)

    1998-01-01

    As if sprung from the rolling exhaust clouds below, Space Shuttle Discovery shoots into the heavens over the blue Atlantic Ocean from Launch Pad 39B on mission STS-95. Lifting off at 2:19 p.m. EST, Discovery carries a crew of six, including Payload Specialist John H. Glenn Jr., senator from Ohio, who is making his second voyage into space after 36 years. Other crew members are Mission Commander Curtis L. Brown Jr., Pilot Steven W. Lindsey, Payload Specialist Chiaki Mukai, (M.D., Ph.D.), with the National Space Development Agency of Japan (NASDA), Mission Specialist Stephen K. Robinson, Mission Specialist Pedro Duque of Spain, representing the European Space Agency (ESA), and Mission Specialist Scott E. Parazynski. The STS-95 mission includes research payloads such as the Spartan solar-observing deployable spacecraft, the Hubble Space Telescope Orbital Systems Test Platform, the International Extreme Ultraviolet Hitchhiker, as well as the SPACEHAB single module with experiments on space flight and the aging process. Discovery is expected to return to KSC at 11:49 a.m. EST on Nov. 7.

  8. KSC-04PD-1133

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. -- Technicians in the Orbiter Processing Facility attach a crane to Discoverys airlock before lifting it for installation. The airlock is located inside the orbiters payload bay and is sized to accommodate two fully suited flight crew members simultaneously. Support functions include airlock depressurization and repressurization, extravehicular activity equipment recharge, liquid-cooled garment water cooling, EVA equipment checkout, and communications. Discovery is designated as the Return to Flight vehicle for mission STS-114, no earlier than March 2005. STS-114 mission is Logistics Flight 1, which is scheduled to deliver supplies and equipment plus the external stowage platform to the International Space Station.

  9. KSC-99pc0143

    NASA Image and Video Library

    1999-01-28

    As part of X-33 launch equipment testing at Edwards Air Force Base, CA, the KSC-developed X-33 weight simulator (top), known as the "iron bird," is lifted to a vertical position at the X-33 launch site. The simulator matches the 75,000-pound weight and 63-foot height of the X-33 vehicle that will be using the launch equipment. KSC's Vehicle Positioning System (VPS) placed the simulator on the rotating launch platform prior to the rotation. The new VPS will dramatically reduce the amount of manual labor required to position a reusable launch vehicle for liftoff

  10. Lunar Landing Research Vehicle (LLRV) in flight

    NASA Technical Reports Server (NTRS)

    1967-01-01

    In this 1967 NASA Flight Reserch Center photograph the Lunar Landing Research Vehicle (LLRV) is viewed from the front. This photograph provideds a good view of the pilot's platform with the restrictive cockpit view like that of he real Lunar Module (LM) When Apollo planning was underway in 1960, NASA was looking for asimulator to profile the descent to the moon's surface. Three conceptssurfaced: an electronic simulator, a tethered device, and the ambitious Dryden contribution, a free-flying vehicle. All three became serious projects, but eventually the NASA Flight Research Center's (FRC) Lunar Landing Research Vehicle (LLRV) became the most significant one. After conceptual planning and meetings with engineers from Bell Aerosystems Company, Buffalo, N.Y., NASA FRC issued a $3.6 million production contract awarded in 1963, for delivery of the first of two vehicles for flight studies. Built of tubular aluminum alloy like a giant four-legged bedstead, the vehicle wasto simulate a lunar landing profile from around 1500 feet to the moon's surface. The LLRV had a turbofan engine mounted vertically in a gimbal, with 4200 pounds of thrust. The engine, lifted the vehicle up to the test altitude and was then throttled back to support five-sixths of the vehicle's weight, thus simulating the reduced gravity of the moon. Two lift rockets with thrust that could be varied from 100 to 500 pounds handled the LLRV's rate of descent and horizontal translations. Sixteen smaller rockets, mounted in pairs, gave the pilot control in pitch, yaw, and roll.. The pilot's platform extended forward between two legs while an electronics platform, similarly located, extended rearward. The pilot had a zero-zero ejection seat that would then lift him away to safety. The two LLRVs were shipped from Bell to the FRC in April 1964, with program emphasis on vehicle No. 1. The first flight, Oct. 30, 1964, NASA research pilot Joe Walker flew it three times for a total of just under 60 seconds, to a peak altitude of approximately 10 feet. By mid-1966 the NASA Flight Research Center had accumulated enough data from the LLRV flight program to give Bell a contract to deliver three Lunar Landing Training Vehicles (LLTVs) at a cost of $2.5 million each. 1966 ended with the phasing out of the Flight Research Center's portion of the LLRV program. The LLRV #1 had flown 198 flights, with flight times reaching 9-1/2 minutes and altitudes of around 750 feet. In December 1966 vehicle No. 1 was shipped to NASA Manned Spacecraft Center, followed by No. 2 in mid January 1967 with a total of six flights. The two LLRV's were soon joined by the three LLTV's. All five vehicles were relied on for simulation and training of moon landings.

  11. Effects of front-loading and stagger angle on endwall losses of high lift low pressure turbine vanes

    NASA Astrophysics Data System (ADS)

    Lyall, M. Eric

    Past efforts to reduce the airfoil count in low pressure turbines have produced high lift profiles with unacceptably high endwall loss. The purpose of the current work is to suggest alternative approaches for reducing endwall losses. The effects of the fluid mechanics and high lift profile geometry are considered. Mixing effects of the mean flow and turbulence fields are decoupled to show that mean flow shear in the endwall wake is negligible compared to turbulent shear, indicating that turbulence dissipation is the primary cause of total pressure loss. The mean endwall flow field does influence total pressure loss by causing excessive wake growth and perhaps outright separation on the suction surface. For equivalent stagger angles, a front-loaded high lift profile will produce less endwall loss than one aft-loaded, primarily by suppressing suction surface flow separation. Increasing the stagger setting, however, increases the endwall loss due to the static pressure field generating a stronger blockage relative to the incoming endwall boundary layer flow and causing a larger mass of fluid to become entrained in the horseshoe vortex. In short, front-loading the pressure distribution suppresses suction surface separation whereas limiting the stagger angle suppresses inlet boundary layer separation. Results of this work suggest that a front-loaded low stagger profile be used at the endwall to reduce the endwall loss.

  12. Single cell isolation process with laser induced forward transfer.

    PubMed

    Deng, Yu; Renaud, Philippe; Guo, Zhongning; Huang, Zhigang; Chen, Ying

    2017-01-01

    A viable single cell is crucial for studies of single cell biology. In this paper, laser-induced forward transfer (LIFT) was used to isolate individual cell with a closed chamber designed to avoid contamination and maintain humidity. Hela cells were used to study the impact of laser pulse energy, laser spot size, sacrificed layer thickness and working distance. The size distribution, number and proliferation ratio of separated cells were statistically evaluated. Glycerol was used to increase the viscosity of the medium and alginate were introduced to soften the landing process. The role of laser pulse energy, the spot size and the thickness of titanium in energy absorption in LIFT process was theoretically analyzed with Lambert-Beer and a thermal conductive model. After comprehensive analysis, mechanical damage was found to be the dominant factor affecting the size and proliferation ratio of the isolated cells. An orthogonal experiment was conducted, and the optimal conditions were determined as: laser pulse energy, 9 μJ; spot size, 60 μm; thickness of titanium, 12 nm; working distance, 700 μm;, glycerol, 2% and alginate depth, greater than 1 μm. With these conditions, along with continuous incubation, a single cell could be transferred by the LIFT with one shot, with limited effect on cell size and viability. LIFT conducted in a closed chamber under optimized condition is a promising method for reliably isolating single cells.

  13. A nonlinear dynamics of trunk kinematics during manual lifting tasks.

    PubMed

    Khalaf, Tamer; Karwowski, Waldemar; Sapkota, Nabin

    2015-01-01

    Human responses at work may exhibit nonlinear properties where small changes in the initial task conditions can lead to large changes in system behavior. Therefore, it is important to study such nonlinearity to gain a better understanding of human performance under a variety of physical, perceptual, and cognitive tasks conditions. The main objective of this study was to investigate whether the human trunk kinematics data during a manual lifting task exhibits nonlinear behavior in terms of determinist chaos. Data related to kinematics of the trunk with respect to the pelvis were collected using Industrial Lumbar Motion Monitor (ILMM), and analyzed applying the nonlinear dynamical systems methodology. Nonlinear dynamics quantifiers of Lyapunov exponents and Kaplan-Yorke dimensions were calculated and analyzed under different task conditions. The study showed that human trunk kinematics during manual lifting exhibits chaotic behavior in terms of trunk sagittal angular displacement, velocity and acceleration. The findings support the importance of accounting for nonlinear dynamical properties of biomechanical responses to lifting tasks.

  14. Analysis on shock wave speed of water hammer of lifting pipes for deep-sea mining

    NASA Astrophysics Data System (ADS)

    Zhou, Zhi-jin; Yang, Ning; Wang, Zhao

    2013-04-01

    Water hammer occurs whenever the fluid velocity in vertical lifting pipe systems for deep-sea mining suddenly changes. In this work, the shock wave was proven to play an important role in changing pressures and periods, and mathematical and numerical modeling technology was presented for simulated transient pressure in the abnormal pump operation. As volume concentrations were taken into account of shock wave speed, the experiment results about the pressure-time history, discharge-time history and period for the lifting pipe system showed that: as its concentrations rose up, the maximum transient pressure went down, so did its discharges; when its volume concentrations increased gradually, the period numbers of pressure decay were getting less and less, and the corresponding shock wave speed decreased. These results have highly coincided with simulation results. The conclusions are important to design lifting transporting system to prevent water hammer in order to avoid potentially devastating consequences, such as damage to components and equipment and risks to personnel.

  15. The effects of standing, lifting and noise exposure on preterm birth, growth restriction, and perinatal death in healthy low-risk working military women.

    PubMed

    Magann, Everett F; Evans, Sharon F; Chauhan, Suneet P; Nolan, Thomas E; Henderson, Jenni; Klausen, Jack H; Newnham, John P; Morrison, John C

    2005-09-01

    The effects of standing, lifting and noise in low-risk, healthy pregnant women are uncertain. In the past, the heterogeneity of the populations studied, the limitations of the designs of the retrospective and case control studies, and a failure of some of the larger investigations to evaluate all the potential confounding variables has hampered many studies. The purpose of this investigation was to evaluate, throughout pregnancy, the effects of standing, repetitive lifting, and noise in the workplace compared with no standing, lifting or noise exposure, on maternal and perinatal outcomes in a large prospective study of a low-risk healthy population of working women cared for by a single group of health providers. This prospective observational study used an extensive questionnaire to collect antepartum, intrapartum, and postpartum information. Information was collected on the initial visit, each subsequent visit, and immediately after delivery. The participating women were divided into groups based on the amount of time spent standing, the amount and extent of repetitive lifting, and noise exposure in the workplace. Eight hundred and fourteen low-risk active duty women participated in this investigation over a 4-year period. Multivariate analysis with non-exposure compared with exposure reinforced the effect of standing on preterm labor (OR 1.80, 95% CI 1.05, 3.16) and preterm birth (OR 1.69, 95% CI 1.03, 2.80) and showed a trend toward an effect of noise exposure on preterm labor (OR 1.76, 95% CI 0.78, 3.39) after controlling for other exposures. This investigation suggests an association of occupational standing with preterm labor and preterm birth.

  16. Poly-SiGe MEMS actuators for adaptive optics

    NASA Astrophysics Data System (ADS)

    Lin, Blake C.; King, Tsu-Jae; Muller, Richard S.

    2006-01-01

    Many adaptive optics (AO) applications require mirror arrays with hundreds to thousands of segments, necessitating a CMOS-compatible MEMS process to integrate the mirrors with their driving electronics. This paper proposes a MEMS actuator that is fabricated using low-temperature polycrystalline silicon-germanium (poly-SiGe) surface-micromaching technology (total thermal budget is 6 hours at or below 425°C). The MEMS actuator consists of three flexures and a hexagonal platform, on which a micromirror is to be assembled. The flexures are made of single-layer poly-SiGe with stress gradient across thickness of the film, making them bend out-of-plane after sacrificial-layer release to create a large nominal gap. The platform, on the other hand, has an additional stress-balancing SiGe layer deposited on top, making the dual-layer stack stay flat after release. Using this process, we have successfully fabricated the MEMS actuator which is lifted 14.6 μm out-of-plane by 290-μm-long flexures. The 2-μm-thick hexagonal mirror-platform exhibits a strain gradient of -5.5×10 -5 μm -1 (equivalent to 18 mm radius-of-curvature), which would be further reduced once the micromirror is assembled.

  17. Evaluating Unmanned Aerial Platforms for Cultural Heritage Large Scale Mapping

    NASA Astrophysics Data System (ADS)

    Georgopoulos, A.; Oikonomou, C.; Adamopoulos, E.; Stathopoulou, E. K.

    2016-06-01

    When it comes to large scale mapping of limited areas especially for cultural heritage sites, things become critical. Optical and non-optical sensors are developed to such sizes and weights that can be lifted by such platforms, like e.g. LiDAR units. At the same time there is an increase in emphasis on solutions that enable users to get access to 3D information faster and cheaper. Considering the multitude of platforms, cameras and the advancement of algorithms in conjunction with the increase of available computing power this challenge should and indeed is further investigated. In this paper a short review of the UAS technologies today is attempted. A discussion follows as to their applicability and advantages, depending on their specifications, which vary immensely. The on-board cameras available are also compared and evaluated for large scale mapping. Furthermore a thorough analysis, review and experimentation with different software implementations of Structure from Motion and Multiple View Stereo algorithms, able to process such dense and mostly unordered sequence of digital images is also conducted and presented. As test data set, we use a rich optical and thermal data set from both fixed wing and multi-rotor platforms over an archaeological excavation with adverse height variations and using different cameras. Dense 3D point clouds, digital terrain models and orthophotos have been produced and evaluated for their radiometric as well as metric qualities.

  18. Herniated disk

    MedlinePlus

    ... help support the spine. A brace may prevent injuries in people who lift heavy objects at work. But ... Cervical radiculopathy; Herniated intervertebral disk; Prolapsed intervertebral disk; Slipped ...

  19. A Rigid Mid-Lift-to-Drag Ratio Approach to Human Mars Entry, Descent, and Landing

    NASA Technical Reports Server (NTRS)

    Cerimele, Christopher J.; Robertson, Edward A.; Sostaric, Ronald R.; Campbell, Charles H.; Robinson, Phil; Matz, Daniel A.; Johnson, Breanna J.; Stachowiak, Susan J.; Garcia, Joseph A.; Bowles, Jeffrey V.; hide

    2017-01-01

    Current NASA Human Mars architectures require delivery of approximately 20 metric tons of cargo to the surface in a single landing. A proposed vehicle type for performing the entry, descent, and landing at Mars associated with this architecture is a rigid, enclosed, elongated lifting body shape that provides a higher lift-to-drag ratio (L/D) than a typical entry capsule, but lower than a typical winged entry vehicle (such as the Space Shuttle Orbiter). A rigid Mid-L/D shape has advantages for large mass Mars EDL, including loads management, range capability during entry, and human spaceflight heritage. Previous large mass Mars studies have focused more on symmetric and/or circular cross-section Mid-L/D shapes such as the ellipsled. More recent work has shown performance advantages for non-circular cross section shapes. This paper will describe efforts to design a rigid Mid-L/D entry vehicle for Mars which shows mass and performance improvements over previous Mid-L/D studies. The proposed concept, work to date and evolution, forward path, and suggested future strategy are described.

  20. Continuous EEG signal analysis for asynchronous BCI application.

    PubMed

    Hsu, Wei-Yen

    2011-08-01

    In this study, we propose a two-stage recognition system for continuous analysis of electroencephalogram (EEG) signals. An independent component analysis (ICA) and correlation coefficient are used to automatically eliminate the electrooculography (EOG) artifacts. Based on the continuous wavelet transform (CWT) and Student's two-sample t-statistics, active segment selection then detects the location of active segment in the time-frequency domain. Next, multiresolution fractal feature vectors (MFFVs) are extracted with the proposed modified fractal dimension from wavelet data. Finally, the support vector machine (SVM) is adopted for the robust classification of MFFVs. The EEG signals are continuously analyzed in 1-s segments, and every 0.5 second moves forward to simulate asynchronous BCI works in the two-stage recognition architecture. The segment is first recognized as lifted or not in the first stage, and then is classified as left or right finger lifting at stage two if the segment is recognized as lifting in the first stage. Several statistical analyses are used to evaluate the performance of the proposed system. The results indicate that it is a promising system in the applications of asynchronous BCI work.

Top