Sample records for work projects administration

  1. The development of the Project NetWork administrative records database for policy evaluation.

    PubMed

    Rupp, K; Driessen, D; Kornfeld, R; Wood, M

    1999-01-01

    This article describes the development of SSA's administrative records database for the Project NetWork return-to-work experiment targeting persons with disabilities. The article is part of a series of papers on the evaluation of the Project NetWork demonstration. In addition to 8,248 Project NetWork participants randomly assigned to receive case management services and a control group, the simulation identified 138,613 eligible nonparticipants in the demonstration areas. The output data files contain detailed monthly information on Supplemental Security Income (SSI) and Disability Insurance (DI) benefits, annual earnings, and a set of demographic and diagnostic variables. The data allow for the measurement of net outcomes and the analysis of factors affecting participation. The results suggest that it is feasible to simulate complex eligibility rules using administrative records, and create a clean and edited data file for a comprehensive and credible evaluation. The study shows that it is feasible to use administrative records data for selecting control or comparison groups in future demonstration evaluations.

  2. 18 CFR 12.4 - Staff administrative responsibility and supervisory authority.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS AND PROJECT WORKS General Provisions § 12.4 Staff administrative responsibility and supervisory authority. (a) Administrative responsibility. The Director of the Office of Energy Projects is...

  3. 18 CFR 12.4 - Staff administrative responsibility and supervisory authority.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS AND PROJECT WORKS General Provisions § 12.4 Staff administrative responsibility and supervisory authority. (a) Administrative responsibility. The Director of the Office of Energy Projects is...

  4. 18 CFR 12.4 - Staff administrative responsibility and supervisory authority.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS AND PROJECT WORKS General Provisions § 12.4 Staff administrative responsibility and supervisory authority. (a) Administrative responsibility. The Director of the Office of Energy Projects...

  5. 13 CFR 305.5 - Project administration by District Organization.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Project administration by District Organization. 305.5 Section 305.5 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE PUBLIC WORKS AND ECONOMIC DEVELOPMENT INVESTMENTS Requirements for Approved Projects...

  6. 18 CFR 12.4 - Staff administrative responsibility and supervisory authority.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Staff administrative responsibility and supervisory authority. 12.4 Section 12.4 Conservation of Power and Water Resources FEDERAL... WATER POWER PROJECTS AND PROJECT WORKS General Provisions § 12.4 Staff administrative responsibility and...

  7. 18 CFR 12.4 - Staff administrative responsibility and supervisory authority.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Staff administrative responsibility and supervisory authority. 12.4 Section 12.4 Conservation of Power and Water Resources FEDERAL... WATER POWER PROJECTS AND PROJECT WORKS General Provisions § 12.4 Staff administrative responsibility and...

  8. Wizard of Work. V.A. Employment & Training Project. The Magic Continues. Final Report & Project Analysis.

    ERIC Educational Resources Information Center

    Gaither, Dick; Baker, John

    An Indianapolis (Indiana) project gave disadvantaged junior high and high school students summer jobs in various departments of a Veterans' Administration hospital. The project combined work with at least 1 hour per day of computerized instruction in basic mathematics and language, work maturity, and specific job competencies. Rules were strict,…

  9. Budgeting for International Projects: In-Country Business Operations and Long-Term Residential Assignments.

    ERIC Educational Resources Information Center

    Richey, John B.

    1994-01-01

    A discussion of international sponsored research program administration looks at budgeting, costs, and procedures for both projects with in-country business operations in developing nations and projects with long-term residential assignments. It is intended for university administrators providing new services to faculty working on international…

  10. Organization and Management of Project Athena.

    ERIC Educational Resources Information Center

    Champine, George A.

    1991-01-01

    Project Athena is a $100 million, eight-year project to install a large network of high performance computer work stations for education and research at the Massachusetts Institute of Technology (MIT). Organizational, legal, and administrative aspects of the project allow two competitors (Digital Equipment Corporation and IBM) to work together…

  11. Estimation of traffic impacts at work zones : state of the practice.

    DOT National Transportation Integrated Search

    2006-01-01

    Assessing the safety and mobility impacts of work zones across the project development phases of road construction and maintenance projects is an emphasis area of the Federal Highway Administration's Final Rule on Work Zone Safety and Mobility1 (Fina...

  12. 40 CFR 35.2036 - Design/build project grants.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... and performing construction management and contract administration, will be in accordance with EPA..., responsible bid; (ii) A lump sum for construction management, contract and project administration services and... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2036 Design/build...

  13. 40 CFR 35.2036 - Design/build project grants.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... and performing construction management and contract administration, will be in accordance with EPA..., responsible bid; (ii) A lump sum for construction management, contract and project administration services and... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2036 Design/build...

  14. 40 CFR 35.2036 - Design/build project grants.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... and performing construction management and contract administration, will be in accordance with EPA..., responsible bid; (ii) A lump sum for construction management, contract and project administration services and... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2036 Design/build...

  15. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1989.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration. Division of Fish and Wildlife.

    1988-11-01

    The FY 1989 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1989. The Work Plan focuses on individual Action Items found in the 1987 Program for which Bonneville Power Administration (BPA) has determined that it has authority and responsibility to implement. Each of the entries in the Work Plan includes objectives, background, and progress to date in achieving those objectives, and a summary of plans for implementation in FY 1989. Most Action Items are implemented through one or moremore » BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. The FY 1989 Work Plan emphasizes continuation of 113 projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. BPA also plans to start 20 new projects in FY 1989. The number of ongoing FY 1988 projects to be continued in FY 1989 and the number of new projects planned to start in FY 1989 are based on current (September 7, 1988) procurement expectations. Several projects presently in BPA's procurement process are expected to be contracted by September 30, 1988, the last day of FY 1988. Although these projects have not yet started, they have been listed in the Work Plan as ongoing FY 1988 projects, based on projected start dates in late September 1988. Throughout the Work Plan, those projects with projected start dates in September 1988 have been noted.« less

  16. Collaboration through Role Play among Graduate Students in Educational Leadership in Distance Learning

    ERIC Educational Resources Information Center

    Howard, Barbara B.; McClannon, Terry W.; Wallace, Paul R.

    2014-01-01

    This project addresses the challenge of preparing educational leaders for future roles in administration in K-12 schools. Through a project-based learning scenario set in a 3-D virtual world, graduate students in school administration and instructional technology worked together in simulated school teams to develop proposals for integrating…

  17. 13 CFR 305.12 - Project sign.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....12 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE PUBLIC WORKS AND ECONOMIC DEVELOPMENT INVESTMENTS Requirements for Approved Projects § 305.12 Project sign. The... the Federal government is participating in the Project. The EDA regional office will provide mandatory...

  18. Solar Grants Spot Training and Jobs.

    ERIC Educational Resources Information Center

    Owen, Walter

    1979-01-01

    Employment and training in solar installation work is provided by fifteen Solar Utilization/Economic Development and Employment (SUEDE) demonstration projects funded by the United States Departments of Labor and Energy and the Community Services Administration. The article describes the projects and the types of work. (MF)

  19. Biomarkers for Early Detection of Clinically Relevant Prostate Cancer: A Multi-Institutional Validation Trial

    DTIC Science & Technology

    2015-10-01

    Suzanne Kolb 12 Project Role: Project Coordinator Researcher Identifier (e.g. ORCID ID): N/A Nearest person month worked: 5 person months...Contribution to Project: Ms. Kolb works under the direction of Drs. Lin and Newcomb to fulfill daily fiscal and administrative functions of the...program. She monitors subaward budgets, provides logistical support. Ms. Kolb works closely with the PASS Deputy Director to maintain IRB files

  20. Biomarkers for Early Detection of Clinically Relevant Prostate Cancer: A Multi-Institutional Validation Trial

    DTIC Science & Technology

    2015-10-01

    Name: Suzanne Kolb 12 Project Role: Project Coordinator Researcher Identifier (e.g. ORCID ID): N/A Nearest person month worked: 5 person...months Contribution to Project: Ms. Kolb works under the direction of Drs. Lin and Newcomb to fulfill daily fiscal and administrative functions of the...program. She monitors subaward budgets, provides logistical support. Ms. Kolb works closely with the PASS Deputy Director to maintain IRB files

  1. Emily Evans | NREL

    Science.gov Websites

    Evans Emily Evans Project Controller Emily.Evans@nrel.gov | 303-275-3125 Emily joined NREL in 2010 . As a Project Administrator in the Integrated Applications Center, Emily works with project managers and teams to develop and maintain project management excellence on large-scale, multi-year projects

  2. Psychologists in Academic Administration: A Call to Action and Service.

    PubMed

    Schmaling, Karen B; Linton, John C

    2017-06-01

    Academic psychologists' backgrounds may prepare them for many aspects of academic administration such as: understanding and working with people; prioritizing others' needs and institutional needs; and managing projects and budgets, e.g., for research grants or training programs. Contemporary academic health centers also may provide opportunities for psychologists to serve in academic health administration. This article encourages psychologists to consider preparing for and seeking administrative and higher-level leadership roles. Six psychologists serving diverse administrative roles-from vice chairs in medical school departments to presidents of universities with academic health centers-reflected on: their paths to administration; their preparation for administrative roles; and the commonalities and differences between the work and skills sets of psychologist health service providers and the work and skill sets required for higher level administrative and leadership roles.

  3. Public Service Professionalism among State Administrators: A Multiple State Study. A Working Paper.

    ERIC Educational Resources Information Center

    Rose, Bruce J.; And Others

    This working paper, part of an ongoing national study, presents preliminary analysis of public service professionalism among state public administrators in many states on the basis of data already produced by a continuing survey research project. Information about the data source and sample profiles are provided. Additionally, the research…

  4. Katie Contos | NREL

    Science.gov Websites

    Katie Contos Photo of Katie Contos Katie Contos Project Controller Katie.Contos@nrel.gov | 303-384 -7386 Katie joined NREL in 2012. As a Project Administrator in the Integrated Applications Center, Katie works with a variety of project leaders and teams in project management, planning, implementation

  5. Computer-based communication in support of scientific and technical work. [conferences on management information systems used by scientists of NASA programs

    NASA Technical Reports Server (NTRS)

    Vallee, J.; Wilson, T.

    1976-01-01

    Results are reported of the first experiments for a computer conference management information system at the National Aeronautics and Space Administration. Between August 1975 and March 1976, two NASA projects with geographically separated participants (NASA scientists) used the PLANET computer conferencing system for portions of their work. The first project was a technology assessment of future transportation systems. The second project involved experiments with the Communication Technology Satellite. As part of this project, pre- and postlaunch operations were discussed in a computer conference. These conferences also provided the context for an analysis of the cost of computer conferencing. In particular, six cost components were identified: (1) terminal equipment, (2) communication with a network port, (3) network connection, (4) computer utilization, (5) data storage and (6) administrative overhead.

  6. Application of the SEIPS Model to Analyze Medication Safety in a Crisis Residential Center.

    PubMed

    Steele, Maria L; Talley, Brenda; Frith, Karen H

    2018-02-01

    Medication safety and error reduction has been studied in acute and long-term care settings, but little research is found in the literature regarding mental health settings. Because mental health settings are complex, medication administration is vulnerable to a variety of errors from transcription to administration. The purpose of this study was to analyze critical factors related to a mental health work system structure and processes that threaten safe medication administration practices. The Systems Engineering Initiative for Patient Safety (SEIPS) model provides a framework to analyze factors affecting medication safety. The model approach analyzes the work system concepts of technology, tasks, persons, environment, and organization to guide the collection of data. In the study, the Lean methodology tools were used to identify vulnerabilities in the system that could be targeted later for improvement activities. The project director completed face-to-face interviews, asked nurses to record disruptions in a log, and administered a questionnaire to nursing staff. The project director also conducted medication chart reviews and recorded medication errors using a standardized taxonomy for errors that allowed categorization of the prevalent types of medication errors. Results of the study revealed disruptions during the medication process, pharmacology training needs, and documentation processes as the primary opportunities for improvement. The project engaged nurses to identify sustainable quality improvement strategies to improve patient safety. The mental health setting carries challenges for safe medication administration practices. Through analysis of the structure, process, and outcomes of medication administration, opportunities for quality improvement and sustainable interventions were identified, including minimizing the number of distractions during medication administration, training nurses on psychotropic medications, and improving the documentation system. A task force was created to analyze the descriptive data and to establish objectives aimed at improving efficiency of the work system and care process involved in medication administration at the end of the project. Copyright © 2017 Elsevier Inc. All rights reserved.

  7. Debbie Meixner | NREL

    Science.gov Websites

    -3709 Debbie is a Project Administrator in the Strategy, Policy & Implementation Group within the Integrated Applications Center where she works on a variety of projects including LEDS GP, Department of experience as an executive assistant and project management assistant in non-profit organizations, city

  8. 13 CFR 305.9 - Project phasing and Investment disbursement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Project phasing and Investment disbursement. 305.9 Section 305.9 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE PUBLIC WORKS AND ECONOMIC DEVELOPMENT INVESTMENTS Requirements for Approved Projects...

  9. 13 CFR 305.4 - Projects for design and engineering work.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... engineering work. 305.4 Section 305.4 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION... and engineering work. In the case of Public Works Investment Assistance awarded solely for design and engineering work, the following additional application requirements and terms shall apply: (a) EDA may...

  10. 13 CFR 305.4 - Projects for design and engineering work.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... engineering work. 305.4 Section 305.4 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION... and engineering work. In the case of Public Works Investment Assistance awarded solely for design and engineering work, the following additional application requirements and terms shall apply: (a) EDA may...

  11. 13 CFR 305.4 - Projects for design and engineering work.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... engineering work. 305.4 Section 305.4 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION... and engineering work. In the case of Public Works Investment Assistance awarded solely for design and engineering work, the following additional application requirements and terms shall apply: (a) EDA may...

  12. 13 CFR 305.4 - Projects for design and engineering work.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... engineering work. 305.4 Section 305.4 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION... and engineering work. In the case of Public Works Investment Assistance awarded solely for design and engineering work, the following additional application requirements and terms shall apply: (a) EDA may...

  13. 13 CFR 305.4 - Projects for design and engineering work.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... engineering work. 305.4 Section 305.4 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION... and engineering work. In the case of Public Works Investment Assistance awarded solely for design and engineering work, the following additional application requirements and terms shall apply: (a) EDA may...

  14. A Career Development Guide for Administrative Officers

    DTIC Science & Technology

    1984-03-01

    PROJECT, TASK AREA 6 WORK UNIT NUMBERS ACSC/EDCC MAXWELL AFB AL 36112 I I. CONTROLLING OFFICE NAME AND ADDRESS 12 . REPORT DATE ACSC/EDCC March 1984... 12 Administrative Positions.................................... 12 Squadron Administrative Officer........................ 12 Executive...Captain to Major - 6 to 11 Years....................... 49 .ajor to Lieutenant Colonel - 12 to 17 Years..........5 Lieutenant Colonel to 0-6 (or beyond

  15. Work zone performance monitoring application development.

    DOT National Transportation Integrated Search

    2016-10-01

    The Federal Highway Administration (FHWA) requires state transportation agencies to (a) collect and analyze safety and mobility data to manage the work zone impacts of individual projects during construction and (b) improve overall agency processes a...

  16. Traffic incident management in construction and maintenance work zones.

    DOT National Transportation Integrated Search

    2009-01-01

    In 2004, the Federal Highway Administration published updated rules governing work zone safety and mobility; all highway construction and maintenance projects using federal-aid highway funds are required to develop transportation management plans (TM...

  17. 45 CFR 2551.25 - What are a sponsor's administrative responsibilities?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) CORPORATION FOR NATIONAL AND COMMUNITY SERVICE SENIOR COMPANION PROGRAM Eligibility and Responsibilities of a... capacity, paid or unpaid, during established working hours. The project director may participate in... procedures covering project and Senior Companion activities. This includes provision of appropriate insurance...

  18. [Physical projects atelier: strategy for physical resources administration learning on nursing].

    PubMed

    Draganov, Patricia Bover; Sanna, Maria Cristina

    2011-09-01

    The success of learning involves adequate strategies. Those inspired on andragogy, which is the science of teaching adults, seem to be ideal for the nursing undergraduate subject "projects", with a focus on the administration of physical resources for nursing. This study reports teaching strategies that try to estimulate the acquisition of competences that make the nurse capable of a dialogue on projects with a multiprofessional team. The strategy involved a workshop composed by four stages: reading of projects, health assistance institute (HAI) attributions, notions on physical scaling strategies and development of a glossary. The strategy, proposed by a graduate student in the subject "Strategies to the teaching of Administration", was tested through practical application, evaluated and approved by graduate students and teachers. The conditions for its implementation are working with few students, availability of proper classrooms and equipment, and partnership with HAIs.

  19. Case Studies in Application of System Engineering Practices to Capstone Projects

    NASA Technical Reports Server (NTRS)

    Murphy, Gloria; vanSusante, Paul; Carmen, Christina; Morris, Tommy; Schmidt, Peter; Zalewski, Janusz

    2011-01-01

    The Exploration Systems Mission Directorate (ESMD) of the National Aeronautics and Space Administration (NASA) sponsors a faculty fellowship program that engages researchers with interests aligned with current ESMD development programs. The faculty-members are committed to run a capstone senior design project based- on the materials and experience gained during the fellowship. For the 2010 - 2011 academic year, 5 projects were approved. These projects are in the areas of mechanical and electrical hardware design and optimization, fault prediction and extra planetary civil site preparation. This work summarizes the projects, describes the student teams performing the work, and comments on the integration of Systems Engineering principles into the projects, as well as the affected course curriculums.

  20. An Administrator's Guide to Installing a Telephone System.

    ERIC Educational Resources Information Center

    Forbes, Phyllis Rossiter

    1986-01-01

    Guidelines for administrators concerning installation of a new campus telephone system address these issues: where to start; location and emergency power; the project team; paperwork; communication among those involved in installation; working with the local operating company; existing wiring; the external cable plant; special needs; and training…

  1. Experiential, Collaborative and Team Projects: Communication Audits in the MBA Communication Course

    ERIC Educational Resources Information Center

    Hart, Claudia; Vroman, Margo; Stulz, Karin

    2015-01-01

    In this paper the authors discuss the challenges and rewards of building a graduate level Managerial Communication course around an experiential communication audit project. The purpose of the project was to provide MBA (Master of Business Administration) students with exposure to the real world responsibilities and demands of working in a complex…

  2. 14 CFR 151.51 - Performance of construction work: Sponsor force account.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Performance of construction work: Sponsor force account. 151.51 Section 151.51 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT... Development Projects § 151.51 Performance of construction work: Sponsor force account. (a) Before undertaking...

  3. 14 CFR 151.51 - Performance of construction work: Sponsor force account.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Performance of construction work: Sponsor force account. 151.51 Section 151.51 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT... Development Projects § 151.51 Performance of construction work: Sponsor force account. (a) Before undertaking...

  4. 14 CFR 151.51 - Performance of construction work: Sponsor force account.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Performance of construction work: Sponsor force account. 151.51 Section 151.51 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT... Development Projects § 151.51 Performance of construction work: Sponsor force account. (a) Before undertaking...

  5. 14 CFR 151.51 - Performance of construction work: Sponsor force account.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Performance of construction work: Sponsor force account. 151.51 Section 151.51 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT... Development Projects § 151.51 Performance of construction work: Sponsor force account. (a) Before undertaking...

  6. 14 CFR 151.51 - Performance of construction work: Sponsor force account.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Performance of construction work: Sponsor force account. 151.51 Section 151.51 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT... Development Projects § 151.51 Performance of construction work: Sponsor force account. (a) Before undertaking...

  7. 7 CFR 634.50 - Program and project monitoring and evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Secretary for Conservation, Research and Education, USDA, the Director of Economics, Policy Analysis, and... representatives working through NRCWCC. (3) Evaluative reports for the program and each project area will be submitted annually to the Secretary of Agriculture and the Administrator, EPA. (c) Funding. (1) Research...

  8. 7 CFR 634.50 - Program and project monitoring and evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Secretary for Conservation, Research and Education, USDA, the Director of Economics, Policy Analysis, and... representatives working through NRCWCC. (3) Evaluative reports for the program and each project area will be submitted annually to the Secretary of Agriculture and the Administrator, EPA. (c) Funding. (1) Research...

  9. 7 CFR 634.50 - Program and project monitoring and evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Secretary for Conservation, Research and Education, USDA, the Director of Economics, Policy Analysis, and... representatives working through NRCWCC. (3) Evaluative reports for the program and each project area will be submitted annually to the Secretary of Agriculture and the Administrator, EPA. (c) Funding. (1) Research...

  10. 7 CFR 634.50 - Program and project monitoring and evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Secretary for Conservation, Research and Education, USDA, the Director of Economics, Policy Analysis, and... representatives working through NRCWCC. (3) Evaluative reports for the program and each project area will be submitted annually to the Secretary of Agriculture and the Administrator, EPA. (c) Funding. (1) Research...

  11. 7 CFR 634.50 - Program and project monitoring and evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Secretary for Conservation, Research and Education, USDA, the Director of Economics, Policy Analysis, and... representatives working through NRCWCC. (3) Evaluative reports for the program and each project area will be submitted annually to the Secretary of Agriculture and the Administrator, EPA. (c) Funding. (1) Research...

  12. 77 FR 33745 - Proposed Information Collection Activity; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-07

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Administration for Children and Families Proposed Information Collection Activity; Comment Request Proposed Projects Title: Native Employment Works (NEW) Program Plan Guidance and Report Requirements. OMB No.: 0970-0174. Description The Native Employment Works...

  13. Load Composition Model Workflow (BPA TIP-371 Deliverable 1A)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chassin, David P.; Cezar, Gustavo V.

    This project is funded under Bonneville Power Administration (BPA) Strategic Partnership Project (SPP) 17-005 between BPA and SLAC National Accelerator Laboratory. The project in a BPA Technology Improvement Project (TIP) that builds on and validates the Composite Load Model developed by the Western Electric Coordinating Council's (WECC) Load Modeling Task Force (LMTF). The composite load model is used by the WECC Modeling and Validation Work Group to study the stability and security of the western electricity interconnection. The work includes development of load composition data sets, collection of load disturbance data, and model development and validation. This work supports reliablemore » and economic operation of the power system. This report was produced for Deliverable 1A of the BPA TIP-371 Project entitled \\TIP 371: Advancing the Load Composition Model". The deliverable documents the proposed work ow for the Composite Load Model, which provides the basis for the instrumentation, data acquisition, analysis and data dissemination activities addressed by later phases of the project.« less

  14. Roving the World

    ERIC Educational Resources Information Center

    Galley, Michelle

    2004-01-01

    The National Aeronautics and Space Administration's unmanned mission to Mars has inspired students throughout the United States and abroad to take part in a variety of science lessons and projects. These particular students get to sit down the hall from the Mars Exploration Rover navigational team and work on projects directly related to the…

  15. Construction Project Administration and Management for Mitigating Work Zone Accidents and Fatalities: An Integrated Risk Management Model

    DOT National Transportation Integrated Search

    2009-10-01

    The goal of this research is to mitigate the risk of highway accidents (crashes) and fatalities in work zones. The approach of this research has been to address the mitigation of work zone crashes through the creation of a formal risk management mode...

  16. Resurrection of Lower Valley School

    ERIC Educational Resources Information Center

    Currens, Kimberly

    2017-01-01

    In 1935, as part of a relief project funded by the Works Progress Administration (WPA 65-66-7752), the State of Texas undertook a statistical and research study of the Texas Public School situation with particular attention to be paid to the efficiency of the existing organization of administrative units, adequacy of public school plants, and the…

  17. The Frustrated Nerds Project--Resources for Systems Administrators in Higher Education: A Resource Webliography

    ERIC Educational Resources Information Center

    Henninger, Jessamyn; Aber, Susan Ward

    2010-01-01

    Systems Architects and Information Technology administrators working in higher education help faculty, staff, and student computer users. Yet, who helps them? What resources do these professionals value? A case study was conducted using purposeful sampling and data collection through electronic interview to gather the preferred information-seeking…

  18. Dominican NGOs move from competition to collaboration.

    PubMed

    Mahler, H

    1995-07-01

    In 1992, the seven nongovernmental organizations (NGO) working to prevent HIV/AIDS in the Dominican Republic received most of their funding and technical assistance from the US Agency for International Development (USAID). In September 1992, however, USAID's AIDSTECH project asked the AIDS Control and Prevention (AIDSCAP) Project to prepare the NGOs for the time when USAID would no longer be their main source of support. To that end, AIDSCAP worked with NGO staff to assess their technical, managerial, and administrative needs, and identified a lack of administrative and managerial experience among many NGO staff. AIDSCAP therefore developed an institutional strengthening plan, including a series of capacity building workshops, in 1993. Many NGOs, however, foreseeing the impending need to compete with other NGOs for limited funds, were not interested in sharing ideas and working together. This article describes how Coordinadora de Animacion Socio-Cultural (CASCO) and the Instituto Dominicano de Desarrollo Integral (IDDI) competed in the context of uncertainty over continued donor funding, but now meet regularly to coordinate HIV/AIDS prevention projects for youth in the Dominican Republic.

  19. Hazardous materials in aquatic environments of the Mississippi River Basin. Quarterly progress report, July 1, 1995--September 30, 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-12-01

    This report is the quarterly progress report for July through September 1995 for work done by Tulane and Xavier Universities under DOE contract number DE-FG01-93-EW53023. Accomplishments for various tasks including administrative activities, collaborative cluster projects, education projects, initiation projects, coordinated instrumentation facility, and an investigators` retreat are detailed in the report.

  20. The Tablet PC for Faculty: A Pilot Project

    ERIC Educational Resources Information Center

    Weitz, Rob R.; Wachsmuth, Bert; Mirliss, Danielle

    2006-01-01

    This paper describes a pilot project with the purpose of evaluating the usefulness of tablet PCs for university professors. The focus is on the value of tablets primarily with respect to teaching and learning (and not for research or administrative work). Sixty-four professors, distributed across the various schools of a university, were provided…

  1. Research Skills Development in Higher Education Students

    ERIC Educational Resources Information Center

    Bergamini, Tiziana Priede; Navarro, Cristina Lopez-Cozar

    2014-01-01

    This case study presents the development of a research project in a third-year undergraduate course, Family Business Administration. The research project aimed at promoting research skills in students. The authors formed working groups of no more than six students, and each group had to select an original research topic after conducting a…

  2. Assessment Administration Guide. Indigenous Mathematics Project. Working Paper 3.

    ERIC Educational Resources Information Center

    Souviney, Randall J.

    The assessement materials described in this report were used by the Indigenous Mathematics Project to document various achievement and cognitive development factors at five sites in Papua New Guinea. The achievement instruments are criteria-referenced and consist of the Primary Maths Achievement Test, The Test of Arithmetic Skills, and the reading…

  3. 14 CFR 151.86 - Lighting and electrical work: General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Lighting and electrical work: General. 151.86 Section 151.86 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRPORTS FEDERAL AID TO AIRPORTS Project Programming Standards § 151.86 Lighting and electrical...

  4. 14 CFR 151.86 - Lighting and electrical work: General.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Lighting and electrical work: General. 151.86 Section 151.86 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRPORTS FEDERAL AID TO AIRPORTS Project Programming Standards § 151.86 Lighting and electrical...

  5. The Use of Management Games for Developing Army Officers in Administrative and Staff Jobs. [Final Report.

    ERIC Educational Resources Information Center

    Olmstead, Joseph A.; Elder, B. Leon

    A research project was undertaken to provide a foundation for future research on the efficacy of games and simulations for use in training and assessing junior company-grade officers working in administrative, nontactical support, and staff jobs. Based on survey interviews with nineteen incumbents of Finance, Adjutant General, and Quartermaster…

  6. Improving efficiency and reducing administrative burden through electronic communication.

    PubMed

    Cook, Katlyn E; Ludens, Gail M; Ghosh, Amit K; Mundell, William C; Fleming, Kevin C; Majka, Andrew J

    2013-01-01

    The InBox messaging system is an internal, electronic program used at Mayo Clinic, Rochester, MN, to facilitate the sending, receiving, and answering of patient-specific messages and alerts. A standardized InBox was implemented in the Division of General Internal Medicine to decrease the time physicians, physician assistants, and nurse practitioners (clinicians) spend on administrative tasks and to increase efficiency. Clinicians completed surveys and a preintervention InBox pilot test to determine inefficiencies related to administrative burdens and defects (message entry errors). Results were analyzed using Pareto diagrams, value stream mapping, and root cause analysis to prioritize administrative-burden inefficiencies to develop a new, standardized InBox. Clinicians and allied health staff were the target of this intervention and received standardized InBox training followed by a postintervention pilot test for clinicians. Sixteen of 28 individuals (57%) completed the preintervention survey. Twenty-eight clinicians participated in 2 separate 8-day pilot tests (before and after intervention) for the standardized InBox. The number of InBox defects was substantially reduced from 37 (Pilot 1) to 7 (Pilot 2). Frequent InBox defects decreased from 25% to 10%. More than half of clinicians believed the standardized InBox positively affected their work, and 100% of clinicians reported no negative affect on their work. This project demonstrated the successful implementation of the standardized InBox messaging system. Initial assessments show substantial reduction of InBox entry defects and administrative tasks completed by clinicians. The findings of this project suggest increased clinician and allied health staff efficiency, satisfaction, improved clinician work-life balance, and decreased clinician burden caused by administrative tasks.

  7. Analysis of Criteria Influencing Contractor Selection Using TOPSIS Method

    NASA Astrophysics Data System (ADS)

    Alptekin, Orkun; Alptekin, Nesrin

    2017-10-01

    Selection of the most suitable contractor is an important process in public construction projects. This process is a major decision which may influence the progress and success of a construction project. Improper selection of contractors may lead to problems such as bad quality of work and delay in project duration. Especially in the construction projects of public buildings, the proper choice of contractor is beneficial to the public institution. Public procurement processes have different characteristics in respect to dissimilarities in political, social and economic features of every country. In Turkey, Turkish Public Procurement Law PPL 4734 is the main regulatory law for the procurement of the public buildings. According to the PPL 4734, public construction administrators have to contract with the lowest bidder who has the minimum requirements according to the criteria in prequalification process. Public administrators are not sufficient for selection of the proper contractor because of the restrictive provisions of the PPL 4734. The lowest bid method does not enable public construction administrators to select the most qualified contractor and they have realised the fact that the selection of a contractor based on lowest bid alone is inadequate and may lead to the failure of the project in terms of time delay Eand poor quality standards. In order to evaluate the overall efficiency of a project, it is necessary to identify selection criteria. This study aims to focus on identify importance of other criteria besides lowest bid criterion in contractor selection process of PPL 4734. In this study, a survey was conducted to staff of Department of Construction Works of Eskisehir Osmangazi University. According to TOPSIS (Technique for Order Preference by Similarity to the Ideal Solution) for analysis results, termination of construction work in previous tenders is the most important criterion of 12 determined criteria. The lowest bid criterion is ranked in rank 5.

  8. 1934: A New Deal for Artists

    ERIC Educational Resources Information Center

    Johnson, Mark M.

    2011-01-01

    During the Great Depression, following the stock market crash of 1929, the nation's greatest financial crisis, President Franklin Delano Roosevelt's administration created the Public Works of Art Project. It was the first federal government program designed to support the arts by putting artists back to work. The program's purpose was to alleviate…

  9. 14 CFR 151.95 - Fences; distance markers; navigational and landing aids; and offsite work.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Fences; distance markers; navigational and landing aids; and offsite work. 151.95 Section 151.95 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRPORTS FEDERAL AID TO AIRPORTS Project Programming...

  10. 45 CFR 2553.25 - What are a sponsor's administrative responsibilities?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) CORPORATION FOR NATIONAL AND COMMUNITY SERVICE THE RETIRED AND SENIOR VOLUNTEER PROGRAM Eligibility and... serve concurrently in another capacity, paid or unpaid, during established working hours. The project...

  11. Comprehensive Child Development Program--A National Family Support Demonstration. First Annual Report.

    ERIC Educational Resources Information Center

    Hubbell, Ruth; And Others

    The Comprehensive Child Development Act of 1988 provided for the establishment of Comprehensive Child Development Program (CCDP) projects to be administered by the Administration on Children, Youth and Families (ACYF). A total of 24 CCDP projects were funded through 1990. The CCDP works with the family as a unit and integrates services across…

  12. A Collaborative Effort at Marketing the University: Detailing a Student-Centered Approach

    ERIC Educational Resources Information Center

    Washburn, Judith H.; Petroshius, Susan M.

    2004-01-01

    In this article, the authors describe the use of an experiential team-based project in a capstone marketing management course. In the project, students worked with the university administration to develop a marketing plan for the Admissions Office's Tour Guide Program. The authors discuss why such marketing activities are important to colleges and…

  13. Supporting On-Site Teacher-Consultants: New York City Writing Project's Community of Learners

    ERIC Educational Resources Information Center

    Osterman, Ed

    2008-01-01

    This monograph describes and analyzes the particular processes and structures that the New York City Writing Project (NYCWP) directors and on-site teacher-consultants have developed that enable them to support and learn from each other and to reflect critically upon the work they do with teachers, students, and administrators. Over time the…

  14. The net effects of the Project NetWork return-to-work case management experiment on participant earnings, benefit receipt, and other outcomes.

    PubMed

    Kornfeld, R; Rupp, K

    2000-01-01

    The Social Security Administration (SSA) initiated Project NetWork in 1991 to test case management as a means of promoting employment among persons with disabilities. The demonstration, which targeted Social Security Disability Insurance (DI) beneficiaries and Supplemental Security Income (SSI) applicants and recipients, offered intensive outreach, work-incentive waivers, and case management/referral services. Participation in Project NetWork was voluntary. Volunteers were randomly assigned to the "treatment" group or the "control" group. Those assigned to the treatment group met individually with a case or referral manager who arranged for rehabilitation and employment services, helped clients develop an individual employment plan, and provided direct employment counseling services. Volunteers assigned to the control group could not receive services from Project NetWork but remained eligible for any employment assistance already available in their communities. For both treatment and control groups, the demonstration waived specific DI and SSI program rules considered to be work disincentives. The experimental impact study thus measures the incremental effects of case and referral management services. The eight demonstration sites were successful in implementing the experimental design roughly as planned. Project NetWork staff were able to recruit large numbers of participants and to provide rehabilitation and employment services on a substantial scale. Most of the sites easily reached their enrollment targets and were able to attract volunteers with demographic characteristics similar to those of the entire SSI and DI caseload and a broad range of moderate and severe disabilities. However, by many measures, volunteers were generally more "work-ready" than project eligible in the demonstration areas who did not volunteer to receive NetWork services. Project NetWork case management increased average annual earnings by $220 per year over the first 2 years following random assignment. This statistically significant impact, an approximate 11-percent increase in earnings, is based on administrative data on earnings. For about 70 percent of sample members, a third year of followup data was available. For this limited sample, the estimated effect of Project NetWork on annual earnings declined to roughly zero in the third followup year. The findings suggest that the increase in earnings may have been short-lived and may have disappeared by the time Project NetWork services ended. Project NetWork did not reduce reliance on SSI or DI benefits by statistically significant amounts over the 30-42 month followup period. The services provided by Project NetWork thus did not reduce overall SSI and DI caseloads or benefits by substantial amounts, especially given that only about 5 percent of the eligible caseload volunteered to participate in Project NetWork. Project NetWork produced modest net benefits to persons with disabilities and net costs to taxpayers. Persons with disabilities gained mainly because the increases in their earnings easily outweighed the small (if any) reduction in average SSI and DI benefits. For SSA and the federal government as a whole, the costs of Project NetWork were not sufficiently offset by increases in tax receipts resulting from increased earnings or reductions in average SSI and DI benefits. The modest net benefits of Project NetWork to persons with disabilities are encouraging. How such benefits of an experimental intervention should be weighed against costs of taxpayers depends on value judgments of policymakers. Because different case management projects involve different kinds of services, these results cannot be directly generalized to other case management interventions. They are nevertheless instructive for planning new initiatives. Combining case and referral management services with various other interventions, such as longer term financial support for work or altered provider incentives, could produc

  15. How Project Managers Really Manage: An Indepth Look at Some Managers of Large, Complex NASA Projects

    NASA Technical Reports Server (NTRS)

    Mulenburg, Gerald M.; Impaeilla, Cliff (Technical Monitor)

    2000-01-01

    This paper reports on a research study by the author that examined ten contemporary National Aeronautics and Space Administration (NASA) complex projects. In-depth interviews with the project managers of these projects provided qualitative data about the inner workings of the project and the methodologies used in establishing and managing the projects. The inclusion of a variety of space, aeronautics, and ground based projects from several different NASA research centers helped to reduce potential bias in the findings toward any one type of project, or technical discipline. The findings address the participants and their individual approaches. The discussion includes possible implications for project managers of other large, complex, projects.

  16. Caldecott improvement project : final scoping summary report.

    DOT National Transportation Integrated Search

    2003-02-01

    The California Department of Transportation (the Department) proposes improvements needed : to reduce congestion and improve mobility at and near the Caldecott Tunnel along State Route : (SR) 24. Working with the Federal Highway Administration (FHWA)...

  17. 30 CFR 880.14 - Administration of contributions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... work. Withdrawals and expenditures from the trust fund will be made only for costs connected with the project. Any part of the money contributed by a State, Indian tribe, local authority, or another Federal...

  18. States, Earth Science, and Decision-Making: Five Years of Lessons Learned by the NASA DEVELOP National Program Working with a State Government

    NASA Astrophysics Data System (ADS)

    Favors, J.; Ruiz, M. L.; Rogers, L.; Ross, K. W.; Childs-Gleason, L. M.; Allsbrook, K. N.

    2017-12-01

    Over a five-year period that spanned two administrations, NASA's DEVELOP National Program engaged in a partnership with the Government of the Commonwealth of Virginia to explore the use of Earth observations in state-level decision making. The partnership conducted multiple applied remote sensing projects with DEVELOP and utilized a shared-space approach, where the Virginia Governor's Office hosted NASA DEVELOP participants to mature the partnership and explore additional science opportunities in the Commonwealth. This presentation will provide an overview of various lessons learned from working in an administrative and policy environment, fostering the use of science in such an environment, and building substantive relationships with non-technical partners. An overview of the projects conducted in this partnership will provide an opportunity to explore specific best practices that enhanced the work and provide tips to enhance the potential for success for other science and technology organizations considering similar partnerships.

  19. Canadian Environmental Concerns: Winnipeg, Manitoba. Progress Report. Project Canada West.

    ERIC Educational Resources Information Center

    Western Curriculum Project on Canada Studies, Edmonton (Alberta).

    Part I of this progress report places emphasis on curriculum development from the standpoint of the teacher-developer. The role is defined and factors such as teacher selection, release time, administrative cooperation, work schedules, assigned work space, and benefits to the school division and to the teacher are discussed. Recommendations deal…

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kerisit, Sebastien N.; Gao, Fei; Xie, YuLong

    This Final Report presents work carried out at Pacific Northwest National Laboratory (PNNL) under the project entitled “Validated Models for Radiation Response and Signal Generation in Scintillators” (Project number: PL10-Scin-theor-PD2Jf) and led by Drs. Fei Gao and Sebastien N. Kerisit. This project was divided into four tasks: 1) Electronic response functions (ab initio data model) 2) Electron-hole yield, variance, and spatial distribution 3) Ab initio calculations of information carrier properties 4) Transport of electron-hole pairs and scintillation efficiency Detailed information on the results obtained in each of the four tasks is provided in this Final Report. Furthermore, published peer-reviewed articlesmore » based on the work carried under this project are included in Appendix. This work was supported by the National Nuclear Security Administration, Office of Nuclear Nonproliferation Research and Development (DNN R&D/NA-22), of the U.S. Department of Energy (DOE).« less

  1. As Public Relationship Application Countinability of Participated Art Projects via Distance Education Method: A Case of "Women's Are Meeting with Literature Project"

    ERIC Educational Resources Information Center

    Taskaya, Merih

    2013-01-01

    Observations of artistic activities' transformative influence in social sphere by social scientists have played an essential role in the rise of "participative art" works worldwide. Within the scope of the public relations practices performed by municipal administrations particularly in order to promote the cultural development of…

  2. How Does Your Kindergarten Classroom Affect Your Earnings? Evidence from Project STAR. NBER Working Paper No. 16381

    ERIC Educational Resources Information Center

    Chetty, Raj; Friedman, John N.; Hilger, Nathaniel; Saez, Emmanuel; Schanzenbach, Diane Whitmore; Yagan, Danny

    2010-01-01

    In Project STAR, 11,571 students in Tennessee and their teachers were randomly assigned to different classrooms within their schools from kindergarten to third grade. This paper evaluates the long-term impacts of STAR using administrative records. We obtain five results. First, kindergarten test scores are highly correlated with outcomes such as…

  3. PARTNER Project 8: Sonic boom mitigation

    NASA Astrophysics Data System (ADS)

    Sparrow, Victor W.

    2005-09-01

    Current U.S. and international laws prohibit commercial supersonic flight over land due to the impact of conventional sonic boom noise. Aircraft manufacturers, however, now have modern computational fluid dynamics and optimization tools, unavailable when those laws were enacted, that will allow them to design and build aircraft with boom signatures that are substantially smoothed compared with traditional N-waves. One purpose of the FAA/NASA/Transport Canada PARTNER Center of Excellence Project 8 is to determine exactly which waveforms would be heard by the public if low-boom supersonic aircraft are put into service. Another purpose is to ascertain the acceptability of those waveforms. The project involves the following universities, government, and industry partners: Penn State, Purdue, Stanford, the National Aeronautics and Space Administration, the Federal Aviation Administration, Boeing, Cessna, Gulfstream, Lockheed-Martin, and Wyle Laboratories. Some of the initial project work includes studies on the propagation of sonic booms through atmospheric turbulence, on the mutual reproducibility of three sonic boom simulators, and on the realism of those simulators as determined by expert listeners. The results of all the studies are intended to provide the FAA with new data to reassess current regulations. [Work supported by NASA, the FAA, and the PARTNER industrial partners.

  4. Planning and environmental linkages for historic preservation.

    DOT National Transportation Integrated Search

    2012-06-01

    The Federal Highway Administration (FHWA) and state and local transportation agencies are working hard to deliver projects more quickly and efficiently, and for less cost. Many state departments of transportation (DOT) and local transportation planni...

  5. Lehigh River Basin, Trexler Lake, Jordan Creek, Pennsylvania. Final Environmental Impact Statement.

    DTIC Science & Technology

    1973-01-01

    InI w-.ater table elevations in the project arra . A lmg in lnn( uti lization from prim-arily private ag-ricultural and] res ident iil.rr’ to nubli c...AND ADDRESS 10. PROGRAM ELEMENT, PROJECT , TASK U.S. Army Engineer District Philadelphia AREA & WORK UNIT NUMBERS 2nd & Chestnut Sts. / I Philadelphia...Administrative ( ) Legislative 2. Description of Action. The Trexler project is located in Lehigh County in southeastern Pennsylvania. The dfm site is

  6. Outcome mapping for fostering and measuring change in risk management behaviour among urban dairy farmers in Nairobi, Kenya.

    PubMed

    Nyangaga, Julius N; Grace, Delia; Kimani, Violet; Kiragu, Monica W; Langat, Alfred K; Mbugua, Gabriel; Mitoko, Grace; Kang'ethe, Erastus K

    2012-09-01

    A study was undertaken to investigate and mitigate the risk from zoonotic Cryptosporidium associated with dairy farming in Dagoretti division, Nairobi, Kenya. Outcome mapping (OM), a relatively new tool for planning and evaluation, was used to foster and then monitor changes in farmer management of health risks. Elements of the OM framework, including the vision, mission and expected progress markers, were developed in participatory sessions and a set of progress markers was used for monitoring behaviour change in farmers participating in the project (the boundary partners). Behaviour change (the outcome challenge) was supported by a range of awareness and educational campaigns, working with strategic partners (extension agents and administrative leaders). The farmers the project worked with made considerable progress according to the markers; they demonstrated an understanding of cryptosporidiosis, established or maintained clean and well drained cattle sheds, and took conscious effort to reduce possible infection. Farmers who did not participate in the project (non-contact farmers) were found to be less advanced on the progress marker indicators. Non-contact farmers who carried out risk-reducing practices had done so independently of the project team. The administration leaders, as strategic partners, had a positive attitude towards the project and confidence in their ability to support project objectives. The study demonstrates the utility of OM in helping to identify and support behavioural change.

  7. Site support program plan for ICF Kaiser Hanford Company, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-10-01

    This document is the general administrative plan implemented by the Hanford Site contractor, ICF Kaiser Hanford Company. It describes the mission, administrative structure, projected staffing, to be provided by the contractor. The report breaks out the work responsibilities within the different units of the company, a baseline schedule for the different groups, and a cost summary for the different operating units.

  8. TELEVISION AND SOCIAL WORK, A CASE HISTORY OF A PROJECT IN ADULT EDUCATION, BASED ON THE BBC-2 TELEVISION SERIES, 'THE SOCIAL WORKERS,' OCTOBER 1965-FEBRUARY 1966.

    ERIC Educational Resources Information Center

    HANDCOCK, ALAN; ROBINSON, JOHN

    A COMBINATION OF TELEVISION, GROUP STUDY, PRIVATE STUDY, CORRESPONDENCE STUDY, AND PRACTICAL WORK PROVIDED AN EXTENSIVE INTRODUCTION TO THE NATURE AND METHODS OF SOCIAL WORK, PRINCIPALLY FOR VOLUNTEER AND PART-TIME WORKERS THROUGH 16 HALF-HOUR PROGRAMS ON SOCIAL WORK AND ADMINISTRATION BROADCAST ON BBC-2 BETWEEN OCTOBER 5, 1965 AND FEBRUARY 8,…

  9. Albeni Falls Wildlife Mitigation : Annual Report 2002.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Terra-Berns, Mary

    The Albeni Falls Interagency Work Group continued to actively engage in implementing wildlife mitigation actions in 2002. Regular Work Group meetings were held to discuss budget concerns affecting the Albeni Falls Wildlife Mitigation Program, to present potential acquisition projects, and to discuss and evaluate other issues affecting the Work Group and Project. Work Group members protected 1,386.29 acres of wildlife habitat in 2002. To date, the Albeni Falls project has protected approximately 5,914.31 acres of wildlife habitat. About 21% of the total wildlife habitat lost has been mitigated. Administrative activities have increased as more properties are purchased and continue tomore » center on restoration, operation and maintenance, and monitoring. In 2001, Work Group members focused on development of a monitoring and evaluation program as well as completion of site-specific management plans. This year the Work Group began implementation of the monitoring and evaluation program performing population and plant surveys, data evaluation and storage, and map development as well as developing management plans. Assuming that the current BPA budget restrictions will be lifted in the near future, the Work Group expects to increase mitigation properties this coming year with several potential projects.« less

  10. McKenzie River Focus Watershed Coordination: Year-End Report 2000.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thrailkil, Jim

    2000-01-01

    This report summarizes accomplishments of the McKenzie River Focus Watershed Council (MWC) in the areas of coordination and administration during Fiscal Year 2000. Coordination and administration consist of prioritization and planning for projects; project management and implementation; procurement of funding for long-term support of the Council; and watershed education/outreach program for residents and local schools. Key accomplishments in the area of project planning include coordinating: monthly Council and executive committee meetings; staffing the Upper Willamette Spring Chinook Working Group; staffing the water quality technical committee; and guiding education and stewardship projects. Key accomplishments in the area of project management includemore » the completion of the McKenzie-Willamette Confluence Assessment; securing funds for project planning in the confluence area; near completion of the BPA funded McKenzie sub-basin assessment; development of a framework for a McKenzie Watershed Conservation Strategy; an evaluation of Council's monitoring programs - ambient water quality, storm-event water quality, Tier III water quality, and macroinvertebrate monitoring. The Council, in cooperation with the McKenzie River Cooperative, completed habitat enhancements in the Gate Creek and Deer Creek sub-watersheds. This partnership recently submitted Bring Back the Natives grant for initiation of projects in other McKenzie tributaries. The Council will also be working with a local business to develop a river-side riparian enhancement and native landscaping project on the lodge grounds. This will serve as a demonstration project for blending fish and wildlife habitat concerns with maintaining grounds for business opportunities. Accomplishments in the area of procurement of funding included developing the FY2000 Scope of Work and budget for approval by the Council and BPA; providing quarterly budget and work program progress reports to the Council; and securing additional funding from Council partner organizations and foundations. Highlights in the area of watershed education/outreach include the MWC's lead role in convening the Watershed Education Network for teachers as part of its educational mission; production of newsletters and brochures; and coordination of media coverage of watershed-related issues.« less

  11. A portfolio evaluation framework for air transportation improvement projects

    NASA Astrophysics Data System (ADS)

    Baik, Hyeoncheol

    This thesis explores the application of portfolio theory to the Air Transportation System (ATS) improvement. The ATS relies on complexly related resources and different stakeholder groups. Moreover, demand for air travel is significantly increasing relative to capacity of air transportation. In this environment, improving the ATS is challenging. Many projects, which are defined as technologies or initiatives, for improvement have been proposed and some have been demonstrated in practice. However, there is no clear understanding of how well these projects work in different conditions nor of how they interact with each other or with existing systems. These limitations make it difficult to develop good project combinations, or portfolios that maximize improvement. To help address this gap, a framework for identifying good portfolios is proposed. The framework can be applied to individual projects or portfolios of projects. Projects or portfolios are evaluated using four different groups of factors (effectiveness, time-to-implement, scope of applicability, and stakeholder impacts). Portfolios are also evaluated in terms of interaction-determining factors (prerequisites, co-requisites, limiting factors, and amplifying factors) because, while a given project might work well in isolation, interdependencies between projects or with existing systems could result in lower overall performance in combination. Ways to communicate a portfolio to decision makers are also introduced. The framework is unique because (1) it allows using a variety of available data, and (2) it covers diverse benefit metrics. For demonstrating the framework, an application to ground delay management projects serves as a case study. The portfolio evaluation approach introduced in this thesis can aid decision makers and researchers at universities and aviation agencies such as Federal Aviation Administration (FAA), National Aeronautics and Space Administration (NASA), and Department of Defense (DoD), in more fully evaluating the air transportation improvement projects.

  12. Innovation in Public Transportation (Fiscal Year 1983)

    DOT National Transportation Integrated Search

    1984-12-01

    Technical assistance projects sponsored by the Urban Mass Transportation Administration (UMTA) of the U.S. Department of Transportation (DOT) are described. This directory's purpose is to provide information on the nature and scope of work now underw...

  13. Librarianship and Information Work: Job Characteristics and Staffing Needs.

    ERIC Educational Resources Information Center

    Sergean, R.

    This report is an analysis of an investigation of staffing requirements for librarianship and information work carried out between 1972 and 1975 under the title of Sheffield Manpower Project. The results of the administration of a job descriptive questionnaire to members in a representative 45 per cent sample of libraries and information units (19…

  14. Umatilla River Subbasin Fish Habitat Improvement Program, 2004-2005 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    St. Hilaire, Danny R.

    This annual report is in fulfillment of contractual obligations with Bonneville Power Administration (BPA), which is the funding source for the Oregon Department of Fish and Wildlife's (ODFW), Umatilla River Subbasin Fish Habitat Improvement Program (Program). The Program works cooperatively with private landowners to develop long-term restoration, under which, passive and active Habitat Improvement Projects are conducted. Historically, projects have included livestock exclusion fencing (passive restoration) to protect riparian habitats, along with the installation of instream structures (active restoration) to address erosion and improve fish habitat. In recent years, the focus of active restoration has shifted to bioengineering treatments and,more » more recently, to channel re-design and reconstruction aimed at improving fish habitat, by restoring stable channel function. This report provides a summary of Program activities for the 2004 calendar year (January 1 through December 31, 2004), within each of the four main project phases, including: (1) Implementation--Pre-Work, (2) Implementation--On Site Development, (3) Operation and Maintenance, and (4) Monitoring and Evaluation. This report also summarizes Program Administrative, Interagency Coordination, and Public Education activities.« less

  15. Performance Management in Portfolio School Districts. A Report from the Doing School Choice Right Project and the National Charter School Research Project

    ERIC Educational Resources Information Center

    Lake, Robin J.; Hill, Paul T.

    2009-01-01

    The search continues for effective ways to educate disadvantaged children in big cities. Different cities have tried varied approaches--intensive work on the professional skills of teachers and administrators in Boston, standardized approaches to instruction in San Diego, and extensive use of vouchers and chartering in Washington, D.C., and…

  16. TRU waste lead organization -- WIPP Project Office Interface Management semi-annual report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Guerrero, J.V.; Gorton, J.M.

    1985-05-01

    The Charter establishing the Interface Control Board and the administrative organization to manage the interface of the TRU Waste Lead Organization and the WIPP Project Office also requires preparation of a summary report describing significant interface activities.'' This report includes a discussion of Interface Working Group (IWG) recommendations and resolutions considered and implemented'' over the reporting period October 1984 to March 1985.

  17. Reading in 3 Languages. La lectura en 3 idiomas. La lecture en langues. Manual Prepared for the Bilingual Demonstration Project, Title VII.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY. Office of Bilingual Education.

    The manual contains forms, handouts, checklists, and other materials used in and developed by the Bilingual Screening and Reading Clinic Demonstration Project of New York City's Community School District 3. The materials are provided for teachers and administrators to use or modify for working with bilingual school populations in need of…

  18. 23 CFR 230.407 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CIVIL RIGHTS EXTERNAL PROGRAMS Construction Contract... means a Federal or State employee regularly employed and experienced in civil rights policies, practices... include preliminary engineering work in project development or engineering services performed by or for a...

  19. 23 CFR 230.407 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CIVIL RIGHTS EXTERNAL PROGRAMS Construction Contract... means a Federal or State employee regularly employed and experienced in civil rights policies, practices... include preliminary engineering work in project development or engineering services performed by or for a...

  20. 23 CFR 230.407 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CIVIL RIGHTS EXTERNAL PROGRAMS Construction Contract... means a Federal or State employee regularly employed and experienced in civil rights policies, practices... include preliminary engineering work in project development or engineering services performed by or for a...

  1. 23 CFR 230.407 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CIVIL RIGHTS EXTERNAL PROGRAMS Construction Contract... means a Federal or State employee regularly employed and experienced in civil rights policies, practices... include preliminary engineering work in project development or engineering services performed by or for a...

  2. 23 CFR 230.407 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CIVIL RIGHTS EXTERNAL PROGRAMS Construction Contract... means a Federal or State employee regularly employed and experienced in civil rights policies, practices... include preliminary engineering work in project development or engineering services performed by or for a...

  3. Surveillance of compliance with tobacco regulations in Örebro County, Sweden: a mixed methods study after the ban of test purchases.

    PubMed

    Schölin, Lisa; Eriksson, Charli

    2012-02-15

    Tobacco has long been known to be one of the most common reasons for sickness and premature deaths in the world. An important aspect of tobacco use is the youth's access to tobacco, and surveillance visits are one way to make sure how retailers are complying with age limit in the tobacco law. In Örebro County, Sweden, a project to reinforce the tobacco legislation was carried out in 2009-2010. One part of the project was surveillance visits that were done according to three different themes, called thematic surveillance. This study is an evaluation of the results from thematic surveillance and has a mixed methods approach. The quantitative analyses concerns protocols from 217 surveillance visits, where questions were asked about three themes (self-monitoring programs; marketing; labeling of products and pricing). In addition, questionnaires filled out by six tobacco administrators who worked within the project were analyzed qualitatively by content analysis in order to study their perceptions and opinions of the project. This study shows that half of the visited retailers had self-monitoring programs. Lack of self-monitoring programs was significantly more common in smaller stores/kiosks and at restaurants. Further, the tobacco administrators who worked within the project perceived thematic surveillance as a good method for accomplishing better structure in surveillance work, but not as effective as purchase attempts (mystery shopping). Thematic surveillance was perceived as positive and the method was also regarded to be a good way to work with surveillance. However, the method could be developed further for optimal use and better effect at the retailers. It is clear that people who work with tobacco prevention at the local level in Örebro County want to use purchase attempts as a surveillance method, and that they believe that purchase attempts is the best way to make sure if store comply with the tobacco law.

  4. Surveillance of compliance with tobacco regulations in Örebro County, Sweden: a mixed methods study after the ban of test purchases

    PubMed Central

    2012-01-01

    Background Tobacco has long been known to be one of the most common reasons for sickness and premature deaths in the world. An important aspect of tobacco use is the youth's access to tobacco, and surveillance visits are one way to make sure how retailers are complying with age limit in the tobacco law. In Örebro County, Sweden, a project to reinforce the tobacco legislation was carried out in 2009-2010. One part of the project was surveillance visits that were done according to three different themes, called thematic surveillance. Methods This study is an evaluation of the results from thematic surveillance and has a mixed methods approach. The quantitative analyses concerns protocols from 217 surveillance visits, where questions were asked about three themes (self-monitoring programs; marketing; labeling of products and pricing). In addition, questionnaires filled out by six tobacco administrators who worked within the project were analyzed qualitatively by content analysis in order to study their perceptions and opinions of the project. Results This study shows that half of the visited retailers had self-monitoring programs. Lack of self-monitoring programs was significantly more common in smaller stores/kiosks and at restaurants. Further, the tobacco administrators who worked within the project perceived thematic surveillance as a good method for accomplishing better structure in surveillance work, but not as effective as purchase attempts (mystery shopping). Conclusions Thematic surveillance was perceived as positive and the method was also regarded to be a good way to work with surveillance. However, the method could be developed further for optimal use and better effect at the retailers. It is clear that people who work with tobacco prevention at the local level in Örebro County want to use purchase attempts as a surveillance method, and that they believe that purchase attempts is the best way to make sure if store comply with the tobacco law. PMID:22336332

  5. Running Head: Evaluation of Contract Versus VA-Staffed CBOCs. Evaluating Contract versus VA-Staffed Community Based Outpatient Clinics (CBOCs) Using Patient Satisfaction and Access Measures in the Veterans Health Administration

    DTIC Science & Technology

    2009-06-01

    Contract versus VA-Staffed Community Based Outpatient Clinics (CBOCS) Using Patient Satisfaction and Access Measures in the Veterans Health ...Administration 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) Belote, Janna, M., Civilian - Veterans Health Administration 5d. PROJECT NUMBER 5e...TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Central Arkansas Veterans Healthcare System 4300 West 7th

  6. Automated Procurement System (APS): Project management plan (DS-03), version 1.2

    NASA Technical Reports Server (NTRS)

    Murphy, Diane R.

    1994-01-01

    The National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC) is implementing an Automated Procurement System (APS) to streamline its business activities that are used to procure goods and services. This Project Management Plan (PMP) is the governing document throughout the implementation process and is identified as the APS Project Management Plan (DS-03). At this point in time, the project plan includes the schedules and tasks necessary to proceed through implementation. Since the basis of APS is an existing COTS system, the implementation process is revised from the standard SDLC. The purpose of the PMP is to provide the framework for the implementation process. It discusses the roles and responsibilities of the NASA project staff, the functions to be performed by the APS Development Contractor (PAI), and the support required of the NASA computer support contractor (CSC). To be successful, these three organizations must work together as a team, working towards the goals established in this Project Plan. The Project Plan includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

  7. Toward a Career Ladder in Nursing: Upgrading Nurse's Aides to LPNs Through a Work-Study Program. Final Progress Report.

    ERIC Educational Resources Information Center

    Medical and Health Research Association of New York City, Inc., NY.

    To arrange a program that would enable nurse's aides to undertake licensed practical nurse (LPN) training without financial sacrifice, a 3-year experimental and demonstration project, funded by the Manpower Administration, was conducted in New York City between October 1967 and September 1969. Through a work-study arrangement, 422 nurse's aides in…

  8. [Workplace health promotion in public health policies in Poland].

    PubMed

    Puchalski, Krzysztof; Korzeniowska, Elzbieta

    2008-01-01

    In this paper the author analyses how far in Poland the idea of workplace health promotion (WHP) does exist in the area of public health understood in its broadest sense. The analysis encapsulates the following issues: (a) the national legislative policy, (b) strategies, programs and projects concerning health issues launched or coordinated by the state or local administration, (c) grassroots initiatives for health promotion supported by local and regional administration, (d) civic projects or business strategies for health. In addition, the author emphasizes the marginalization of workplace health promotion and lack of cohesive policy in this field as well as, the fact that health problems of the working population arising from current demographic, technological, economic and social changes that could be dealt with through developing and implementing WHP projects are not yet fully perceived by public health policy makers.

  9. 23 CFR 140.902 - Applicability.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Applicability. 140.902 Section 140.902 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES REIMBURSEMENT Reimbursement for Railroad Work § 140.902 Applicability. This subpart, and all references hereinafter made to “projects...

  10. 23 CFR 140.902 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Applicability. 140.902 Section 140.902 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES REIMBURSEMENT Reimbursement for Railroad Work § 140.902 Applicability. This subpart, and all references hereinafter made to “projects...

  11. 23 CFR 140.902 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Applicability. 140.902 Section 140.902 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES REIMBURSEMENT Reimbursement for Railroad Work § 140.902 Applicability. This subpart, and all references hereinafter made to “projects...

  12. 23 CFR 140.902 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Applicability. 140.902 Section 140.902 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES REIMBURSEMENT Reimbursement for Railroad Work § 140.902 Applicability. This subpart, and all references hereinafter made to “projects...

  13. Albeni Falls Wildlife Mitigation Project, 2008 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Soults, Scott

    The Albeni Falls Interagency Work Group (AFIWG) was actively involved in implementing wildlife mitigation activities in late 2007, but due to internal conflicts, the AFIWG members has fractionated into a smaller group. Implementation of the monitoring and evaluation program continued across protected lands. As of 2008, The Albeni Falls Interagency Work Group (Work Group) is a coalition comprised of wildlife managers from three tribal entities (Kalispel Tribe, Kootenai Tribe, Coeur d Alene Tribe) and the US Army Corps of Engineers. The Work Group directs where wildlife mitigation implementation occurs in the Kootenai, Pend Oreille and Coeur d Alene subbasins. Themore » Work Group is unique in the Columbia Basin. The Columbia Basin Fish and Wildlife Authority (CBFWA) wildlife managers in 1995, approved what was one of the first two project proposals to implement mitigation on a programmatic basis. The maintenance of this kind of approach through time has allowed the Work Group to implement an effective and responsive habitat protection program by reducing administrative costs associated with site-specific project proposals. The core mitigation entities maintain approximately 9,335 acres of wetland/riparian habitats in 2008.« less

  14. Advanced Engineering Environment FY09/10 pilot project.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lamph, Jane Ann; Kiba, Grant W.; Pomplun, Alan R.

    2010-06-01

    The Advanced Engineering Environment (AEE) project identifies emerging engineering environment tools and assesses their value to Sandia National Laboratories and our partners in the Nuclear Security Enterprise (NSE) by testing them in our design environment. This project accomplished several pilot activities, including: the preliminary definition of an engineering bill of materials (BOM) based product structure in the Windchill PDMLink 9.0 application; an evaluation of Mentor Graphics Data Management System (DMS) application for electrical computer-aided design (ECAD) library administration; and implementation and documentation of a Windchill 9.1 application upgrade. The project also supported the migration of legacy data from existing corporatemore » product lifecycle management systems into new classified and unclassified Windchill PDMLink 9.0 systems. The project included two infrastructure modernization efforts: the replacement of two aging AEE development servers for reliable platforms for ongoing AEE project work; and the replacement of four critical application and license servers that support design and engineering work at the Sandia National Laboratories/California site.« less

  15. Accreditation of Employee Development.

    ERIC Educational Resources Information Center

    Geale, John

    A British project was conducted to improve understanding of the advantages and disadvantages of certification for work-based training and to analyze factors that influence the demand for accreditation. Three studies investigated what was happening in three employment sectors: tourism (service/commercial), social services (public administration),…

  16. Technology, Time, and Participation: How a Principal Supports Teachers.

    ERIC Educational Resources Information Center

    McCarthy, Robert B.

    1985-01-01

    Argues that administrations might better support teachers if they provided: (1) up-to-date technology, such as Xerox machines; (2) "guilt-free" time for curriculum work or special projects; and (3) more opportunities for teacher participation in school decision making. (KH)

  17. 23 CFR 140.900 - Purpose.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Purpose. 140.900 Section 140.900 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES REIMBURSEMENT Reimbursement for... reimbursement to the States for railroad work done on projects undertaken pursuant to the provisions of 23 CFR...

  18. 23 CFR 140.900 - Purpose.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Purpose. 140.900 Section 140.900 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES REIMBURSEMENT Reimbursement for... reimbursement to the States for railroad work done on projects undertaken pursuant to the provisions of 23 CFR...

  19. 23 CFR 140.900 - Purpose.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Purpose. 140.900 Section 140.900 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES REIMBURSEMENT Reimbursement for... reimbursement to the States for railroad work done on projects undertaken pursuant to the provisions of 23 CFR...

  20. Did JCLP Really Work?

    ERIC Educational Resources Information Center

    Hencey, Robert

    1981-01-01

    Considers the methodology, findings, and conclusions of three studies conducted by Stephen Epler, Louis Bender, and James Perkins, which evaluated the Junior College Leadership Program. The project was funded from 1959 through 1974 to establish university programs for the preparation of two-year college administrators. (DML)

  1. [Hospital management in Brazil: a review of the literature with a view toenhance administrative practices in hospitals].

    PubMed

    Farias, Diego Carlos; Araujo, Fernando Oliveira de

    2017-06-01

    Hospitals are complex organizations which, in addition to the technical assistance expected in the context of treatment and prevention of health hazards, also require good management practices aimed at improving their efficiency in their core business. However, in administrative terms, recurrent conflicts arise involving technical and managerial areas. Thus, this article sets out to conducta review of the scientific literature pertaining to the themes of hospital management and projects that have been applied in the hospital context. In terms of methodology, the study adopts the webiblioming method of collection and systematic analysis of knowledge in indexed journal databases. The results show a greater interest on the part of researchers in looking for a more vertically and horizontally dialogical administration, better definition of work processes, innovative technological tools to support the management process and finally the possibility of applying project management methodologies in collaboration with hospital management.

  2. 1994 Activity Report, National Synchrotron Light Source. Annual report, October 1, 1993-September 30, 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rothman, E.Z.

    1995-05-01

    This report is a summary of activities carried out at the National Synchrotron Light Source during 1994. It consists of sections which summarize the work carried out in differing scientific disciplines, meetings and workshops, operations experience of the facility, projects undertaken for upgrades, administrative reports, and collections of abstracts and publications generated from work done at the facility.

  3. Shillapoo Wildlife Area, Annual Report 2006-2007.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Calkins, Brian

    This report summarizes accomplishments, challenges and successes on WDFW's Shillapoo Wildlife Area funded under Bonneville Power Administration's (BPA) Wildlife Mitigation Program (BPA project No.2003-012-00) during the Fiscal Year 07 contract period October 1, 2006-September 30, 2007. The information presented here is intended to supplement that contained in BPA's PISCES contract development and reporting system. The organization below is by broad categories of work but references are made to individual work elements in the PISCES Statement of Work as appropriate. The greatest success realized during this contract period was significant positive changes in the vegetative community in several wetland basins throughoutmore » the wildlife area. This major goal is being achieved in part by new equipment and operation capability funded under the BPA contract, state capital and migratory bird stamp funds, and the past or ongoing investment of other partners including Ducks Unlimited, The Natural Resources Conservation Service (NRCS), Clark Public Utilities and others. We continue to be challenged by requirements under the archaeological and historic preservation act necessary to protect many sensitive sites known to occur within the wildlife area. The problems encountered to date have been largely administrative in nature and those experienced this year were unforeseen and probably unavoidable. Early in the contract period, WDFW and BPA had agreed to have a BPA staff archaeologist perform the survey and reporting work. Unexpectedly, just prior to the expected start date for the surveys, the employee resigned leaving BPA's staff short handed and necessitated contracting the work with an archaeological consultant. This delay caused us to forego work on several projects that are now deferred until the next contract period. The most notable projects impacted by this unfortunate circumstance are those involving the construction or repair of fences.« less

  4. Evaluation of dowel bar alignment and effect on long-term performance of jointed concrete pavement.

    DOT National Transportation Integrated Search

    2013-09-01

    Recent concerns of misaligned dowel bars led to a technical assistance project : to investigate the roadways in question using a MIT-SCAN-2 device borrowed : from the Federal Highway Administration (FHWA). The device worked extremely : well, and the ...

  5. 13 CFR 305.8 - Recipient-furnished equipment and materials.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Recipient-furnished equipment and materials. 305.8 Section 305.8 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE PUBLIC WORKS AND ECONOMIC DEVELOPMENT INVESTMENTS Requirements for Approved Projects...

  6. 13 CFR 305.10 - Bid underrun.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Bid underrun. 305.10 Section 305.10 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE PUBLIC WORKS AND ECONOMIC DEVELOPMENT INVESTMENTS Requirements for Approved Projects § 305.10 Bid underrun. If...

  7. 13 CFR 305.13 - Contract change orders.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Contract change orders. 305.13 Section 305.13 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE PUBLIC WORKS AND ECONOMIC DEVELOPMENT INVESTMENTS Requirements for Approved Projects § 305.13 Contract...

  8. SP-100, a project manager's view

    NASA Technical Reports Server (NTRS)

    Truscello, Vincent C.

    1983-01-01

    Born to meet the special needs of America's space effort, the SP-100 Program testifies to the cooperation among government agencies. The Department of Energy (DOE), the National Aeronautics and Space Administration (NASA), and the Defense Advanced Research Projects Agency (DARPA) are working together to produce a 100-kW power system for use in outer space. At this point in the effort, it is appropriate to review: The approach to meet program goals; the status of activities of the Project Office, managed by the Jet Propulsion Laboratory (JPL); and, because this is a meeting on materials, answers beings developed by the Project Office to vital questions on refractory alloy technology.

  9. [Purveyors of technology: provincial engineers and the construction of road infrastructure in Minas Gerais].

    PubMed

    Barbosa, Lidiany Silva

    2011-01-01

    The article analyzes the role played by engineers in the construction of road infrastructure in Minas Gerais between the 1840s and 1880s. Building and providing regular maintenance for roads and bridges was a task carried out by the Minas Gerais provincial government, which since the 1830s had a specific agency assigned to designing, building, and maintaining public communication routes. Engineers were part of the agency from its inception, playing a significant role in designing projects and in the actual execution of certain works. The current study is grounded in administrative documentation in which the details of work progress are reported to the provincial government. The gathered records provide technical, administrative, and financial information, along with data on labor power and the agents engaged in construction works.

  10. Work-related injuries and fatalities in the geotechnical site works.

    PubMed

    Akboğa Kale, Özge; Eskişar, Tuğba

    2018-05-19

    Geotechnical site works are comprehensive, and they constitute the first step of the construction process. This study performs data mining of geotechnical works and analyzes the database for the root causes of accidents. The Occupational Safety and Health Administration (OSHA) was chosen for the 1984-2013 time frame with 247 cases. Descriptive statistical analyses were performed to discuss variables such as the end use of the work, project type and cost, soil type and condition, type and degree of injury, cause and type of accident, unsafe acts, and occupation and union status of the victim. The results showed that these accidents have a high frequency of recurrence and have a high severity level (54.3% fatalities). In addition, a total of 838 violations were recorded with penalties reaching 5 million US dollars. This study emphasizes that project-specific countermeasures should be taken regarding the root causes of accidents, leading to vigorous strategies to develop safety measures.

  11. 24 CFR 594.25 - Project administration.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Project administration. 594.25 Section 594.25 Housing and Urban Development Regulations Relating to Housing and Urban Development... Grant Amounts § 594.25 Project administration. Project administration will be governed by the terms of...

  12. 24 CFR 594.25 - Project administration.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 3 2011-04-01 2010-04-01 true Project administration. 594.25 Section 594.25 Housing and Urban Development Regulations Relating to Housing and Urban Development... Grant Amounts § 594.25 Project administration. Project administration will be governed by the terms of...

  13. 24 CFR 594.25 - Project administration.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 3 2013-04-01 2013-04-01 false Project administration. 594.25 Section 594.25 Housing and Urban Development Regulations Relating to Housing and Urban Development... Grant Amounts § 594.25 Project administration. Project administration will be governed by the terms of...

  14. 24 CFR 594.25 - Project administration.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 3 2014-04-01 2013-04-01 true Project administration. 594.25 Section 594.25 Housing and Urban Development Regulations Relating to Housing and Urban Development... Grant Amounts § 594.25 Project administration. Project administration will be governed by the terms of...

  15. 24 CFR 594.25 - Project administration.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 3 2012-04-01 2012-04-01 false Project administration. 594.25 Section 594.25 Housing and Urban Development Regulations Relating to Housing and Urban Development... Grant Amounts § 594.25 Project administration. Project administration will be governed by the terms of...

  16. Tyler Junior College, Exploring America's Communities.

    ERIC Educational Resources Information Center

    Tyler Junior Coll., TX.

    In 1996, Texas's Tyler Junior College (TJC) participated in the American Association of Community Colleges' Exploring America's Communities project, which works to strengthen the teaching and learning of American history, literature, and culture at U.S. community colleges. TJC's action plan goals were to solicit administrative endorsement and…

  17. Apollo: Changing the Way We Work.

    ERIC Educational Resources Information Center

    Schroeder, John R.; Bleed, Ron

    In January 1994, Arizona's Maricopa Community College District issued a request for proposals to develop new administrative software applications to solve problems related to high maintenance costs for existing systems and difficulties in updating software. The result was the Apollo Project, in which the District contracted with Oracle Corporation…

  18. A Comparison of the Ship System Acquisition Process of the Greek Navy and US Navy.

    DTIC Science & Technology

    1984-12-01

    ADDRESS 10. PROGRAM ELEMENT, PROJECT, TASK AREA & WORK UNIT NUMBERS Naval Postgraduate School Monterey, California 93943 II. CONTROLLING OFFICE NAME AND...Approved by: ------ so -- -- -= B T= ag -- - - Department of Administrative Sciences Dean of Information and Poliy Sciences 3...for their attentive assistance in all phases of this work . Furthermore, I would like tc express my sincere content- ment to: o My wife Katerina who

  19. Australian doctors' non-clinical activities: results from the Medicine in Australia: Balancing Employment and Life (MABEL) survey of doctors.

    PubMed

    Joyce, Catherine; Eyre, Harris; Wang, Wei Chun; Laurence, Caroline

    2015-11-01

    The aim of the present study was to investigate non-clinical work conducted by Australian doctors. This study was an exploratory descriptive study using data from Wave 5 of the Medicine in Australia: Balancing Employment and Life (MABEL) longitudinal survey, collected in 2012 from Australian medical practitioners (2200 general practitioners (GPs), 3455 specialists, 1270 specialists in training and 1656 hospital non-specialists). The main outcome measure was the number of hours worked per week in non-clinical work. Regression analysis was used to determine associations between non-clinical activities (i.e. education-related, management and administration and other) and personal and professional characteristics, including age, gender, job and life satisfaction, total clinical working hours, sector of practice (public or private) and doctor type. Australian doctors spend an average of just under 7 h per week, or 16% of their working time, on non-clinical activities. Doctors who worked more hours on non-clinical activities overall, and in education-related and management and administration specifically, were male, younger, had lower life satisfaction and generally spent fewer hours on clinical work. Lower job satisfaction was associated with longer management and administration hours, but not with time spent in education-related activities. Specialists were more likely to work long non-clinical hours, whereas GPs were more likely to report none. Hospital non-specialists reported relatively high management and administration hours. Further work is required to better understand the full range of non-clinical activities doctors are involved in and how this may impact future workforce projections.

  20. Administrative and Technical Support for the U.S. Army Medical Research and Development Command Joint Working Group on Medical Chemical Defense

    DTIC Science & Technology

    1989-08-01

    microproces;qor databaAing systems for monitoring project and contract reports and program technology trans. fers, coordinating and providing administratIvo ...The JWGD 3 annual planning process generally included: - Program review by the JWGD’ membership at quarterly meetings, which consisted of the review...Office developed the program planning and budget documents associated with the planning process outlined above. Program project databases and

  1. STEM Focus in Innoventure Competition Theme

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2010-03-31

    This report documents the inclusion of the STEM focus in the annual competition theme for the Innoventure youth project. The STEM concepts have always played a part in the selection of the theme. However, this year, STEM is intentionally mentioned in the description of the theme to emphasize the importance of these concepts. This work is a part of the National Security Preparedness Project (NSPP), being performed under a Department of Energy (DOE)/National Nuclear Security Administration (NNSA) grant.

  2. Working More Productively: Tools for Administrative Data

    PubMed Central

    Roos, Leslie L; Soodeen, Ruth-Ann; Bond, Ruth; Burchill, Charles

    2003-01-01

    Objective This paper describes a web-based resource () that contains a series of tools for working with administrative data. This work in knowledge management represents an effort to document, find, and transfer concepts and techniques, both within the local research group and to a more broadly defined user community. Concepts and associated computer programs are made as “modular” as possible to facilitate easy transfer from one project to another. Study Setting/Data Sources Tools to work with a registry, longitudinal administrative data, and special files (survey and clinical) from the Province of Manitoba, Canada in the 1990–2003 period. Data Collection Literature review and analyses of web site utilization were used to generate the findings. Principal Findings The Internet-based Concept Dictionary and SAS macros developed in Manitoba are being used in a growing number of research centers. Nearly 32,000 hits from more than 10,200 hosts in a recent month demonstrate broad interest in the Concept Dictionary. Conclusions The tools, taken together, make up a knowledge repository and research production system that aid local work and have great potential internationally. Modular software provides considerable efficiency. The merging of documentation and researcher-to-researcher dissemination keeps costs manageable. PMID:14596394

  3. Memorandum Order No. 151, 27 January 1988.

    PubMed

    1988-01-01

    This Order creates in the Philippines a National Government Center (NGC) Housing Committee to implement Proclamation No. 137 of 11 August 1987, which set aside 150 acres of land for the development of a housing project. The project is to serve as a prototype for developing land within the framework of the existing urban land reform laws. The Committee has the power to do the following: "b.1) Define the project's concept and strategies of implementation; b.2) formulate policies and guidelines on: b.2.1) land disposition, allocation and distribution of NGC housing site to bona fide residents subject to the provisions of Proclamation No. 137 dated August 11, 1987; b.2.2) population containment within the defined project area; b.2.3) qualified beneficiaries for the project; b.2.4) housing finance for beneficiaries; and b.2.5) project administration and other implementation requirements; b.3) formulate systems and procedures for project implementation; b.4) prepare the project's work program and budget; b.5) identify and mobilize fund resources for project implementation; b.6) monitor and evaluate all phases of project implementation; b.7) make final decisions on all cases and issues affecting project implementation which cannot be resolved at the operations level; b.8) call on any government department or agency for assistance whenever necessary." Further provisions of the order deal with the composition of the Committee, the Project Administrator, support agencies, and funding, among other things. full text

  4. How School Leadership Development Evolves: Crossing Timescales and Settings

    ERIC Educational Resources Information Center

    Jensen, Ruth; Vennebo, Kirsten Foshaug

    2016-01-01

    Purpose: This paper aims to address workplace learning in terms of investigating school leadership development in an inter-professional team (the team) in which principals, administrators and researchers work together on a local school improvement project. The purpose is to provide an enriched understanding of how school leadership development…

  5. General Physics as a Major

    ERIC Educational Resources Information Center

    Peckham, Donald C.; Romer, Alfred

    1976-01-01

    A three-year general physics program which uses a single text from which a sequence of one-year courses have been constructed is described. It is organized on a modified spiral approach and requires laboratory work culminating in an experimental project during the sixth semester. Discussion includes implementation and administration of the…

  6. The Dissertation in Practice: A Student's Perspective

    ERIC Educational Resources Information Center

    Stacy, Jaime C.

    2013-01-01

    This article describes the impact that coursework related to Virginia Commonwealth University's inaugural EdD program had on a public school administrator; particularly how the Carnegie Project for the Educational Doctorate's (CPED) working principles continue to play a role in solving "Problems of Practice" in an at-risk school long…

  7. 24 CFR 1003.509 - Force account construction.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Force account construction. 1003... Administration § 1003.509 Force account construction. (a) The use of tribal work forces for construction or... Area ONAP before the start of project implementation. In reviewing requests for an approval of force...

  8. What Do Information Technology Support Services Really Cost?

    ERIC Educational Resources Information Center

    Leach, Karen; Smallen, David

    1998-01-01

    A study examined the cost of information-technology support services in higher education institutions. The report describes the project's origins and work to date and reports initial results in three areas: network services, desktop repair services, and administrative information systems, looking in each case at economies of scale, outsourcing…

  9. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2102 Water quality... Administrator shall first determine that the project is: (a) Included in any water quality management plan being...

  10. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2102 Water quality... Administrator shall first determine that the project is: (a) Included in any water quality management plan being...

  11. Completing the Dissertation: It's Not Only about Academics

    ERIC Educational Resources Information Center

    Dominguez, Ramon

    2006-01-01

    The culminating project in completing a doctorate in education is the preparation and final defense of the dissertation. Specifically in educational administration and leadership, the student will have exerted hours of energy participating in course work, internships as well as in written and oral comprehensive examinations. By the time a student…

  12. The Digital Workforce: Update, August 2000 [and] The Digital Work Force: State Data & Rankings, September 2000.

    ERIC Educational Resources Information Center

    Sargent, John

    The Office of Technology Policy analyzed Bureau of Labor Statistics' growth projections for the core occupational classifications of IT (information technology) workers to assess future demand in the United States. Classifications studied were computer engineers, systems analysts, computer programmers, database administrators, computer support…

  13. 40 CFR 35.2024 - Combined sewer overflows.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2024 Combined sewer... project priority list, it addresses impaired uses in priority water quality areas which are due to the... must demonstrate to the Administrator that the water quality goals of the Act will not be achieved...

  14. 40 CFR 35.2024 - Combined sewer overflows.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2024 Combined sewer... project priority list, it addresses impaired uses in priority water quality areas which are due to the... must demonstrate to the Administrator that the water quality goals of the Act will not be achieved...

  15. 40 CFR 35.2024 - Combined sewer overflows.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2024 Combined sewer... project priority list, it addresses impaired uses in priority water quality areas which are due to the... must demonstrate to the Administrator that the water quality goals of the Act will not be achieved...

  16. Preparing Students for Leadership in Tomorrow's Work.

    ERIC Educational Resources Information Center

    Brand, Betsy

    If educators, policymakers, and school administrators Employment Policy's current project on at-risk youth aged 9 to 15 school, graduate, and enjoy learning. Unfortunately, the current policy on education is targeted to young people who go on to college. Another fundamental problem with schools is that the school curriculum has become disconnected…

  17. Employee Involvement - White-Collar Work Force

    DTIC Science & Technology

    1993-01-01

    a currently valid OMB control number. 1. REPORT DATE JAN 1993 2. REPORT TYPE N/A 3. DATES COVERED - 4. TITLE AND SUBTITLE Employee ...Involvement - White-Collar Work Force 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER...34Persons acting on behalf of the Maritime Administration" includes any employee , contractor, or subcontractor to the contractor of the Maritime

  18. Integrative Lifecourse and Genetic Analysis of Military Working Dogs

    DTIC Science & Technology

    2013-10-01

    Working Dogs 5b. GRANT NUMBER W81XWH-11-2-0226 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) Dr. Kun Huang 5d. PROJECT NUMBER 5e. TASK...we submitted final revisions on our IACUC protocol for the collection of biological samples and Lackland veterinary approval was granted ; and...final Lackland AFB oversight approval was granted and those documents were submitted to DoD CDMRP grant administration. Currently, there is one final

  19. U.S. Navy Capstone Strategies & Concepts (1970-2009) With Context & Insights for the U.S. Navy of 2009 & Beyond

    DTIC Science & Technology

    2009-02-01

    AUTHOR(S) Swartz, Peter, M. 5d. PROJECT NUMBER R0148 5e. TASK NUMBER 4223 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND...government inter-agency partners • US industrial base & shipbuilding • Little on USMC • Just distribution list & USMC CV TACAIR bid 104 Project ...Administration: • USN build -up, including MSC fleet • Distrusted commercial shipbuilding subsidies • Ended construction -differential policy • Allowed

  20. Automated Neuropsychological Assessment Metrics Version 4 (ANAM4): Select Psychometric Properties and Administration Procedures

    DTIC Science & Technology

    2013-12-01

    review Task 22 Preparation of Project Final Report 6 A request for a 12 month no- cost extension for this study was approved on 7 November 2012...extending study activities through December 2013. A modified statement of work, approved as part of the no- cost extension, is presented in Table 6. Table...6: MODIFIED SOW for remaining PROJECT Tasks and STUDY TIMETABLE (Nov 2012) A request for an additional 12 month no- cost extension for this study

  1. Staff Scientist | Center for Cancer Research

    Cancer.gov

    The scientist will be tasked with independent research projects that support and/or further the scope of our laboratory goals as determined by the Principal Investigator. The scientist will be responsible for overseeing daily operations and coordination of projects in close conjunction with all laboratory personnel. The scientist will participate in teaching laboratory methods to first-time post-docs, research fellows, and students. The scientist will work closely with a full-time research biologist, both in collaboration of research projects and in the lab-critical administrative tasks of IRB-approval, animal protocols, budget, etc. Our laboratory has two post-doctoral researchers at any given time. This is a great opportunity for candidates who are interested in cancer biology and want to grow their research career by working in our program with outstanding support of other established laboratories and core facilities in the National Cancer Institute.

  2. 23 CFR 940.13 - Project administration.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Project administration. 940.13 Section 940.13 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION INTELLIGENT TRANSPORTATION SYSTEMS INTELLIGENT TRANSPORTATION SYSTEM ARCHITECTURE AND STANDARDS § 940.13 Project administration. (a) Prior to...

  3. 23 CFR 940.13 - Project administration.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Project administration. 940.13 Section 940.13 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION INTELLIGENT TRANSPORTATION SYSTEMS INTELLIGENT TRANSPORTATION SYSTEM ARCHITECTURE AND STANDARDS § 940.13 Project administration. (a) Prior to...

  4. 23 CFR 940.13 - Project administration.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Project administration. 940.13 Section 940.13 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION INTELLIGENT TRANSPORTATION SYSTEMS INTELLIGENT TRANSPORTATION SYSTEM ARCHITECTURE AND STANDARDS § 940.13 Project administration. (a) Prior to...

  5. 23 CFR 940.13 - Project administration.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Project administration. 940.13 Section 940.13 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION INTELLIGENT TRANSPORTATION SYSTEMS INTELLIGENT TRANSPORTATION SYSTEM ARCHITECTURE AND STANDARDS § 940.13 Project administration. (a) Prior to...

  6. Final Report for Annex II--Assessment of Solar Radiation Resources In Saudi Arabia, 1998-2000

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Myers, D. R.; Wilcox, S. M.; Marion, W. F.

    2002-04-01

    The Final Report for Annex II - Assessment of Solar Radiation Resources in Saudi Arabia 1998-2000 summarizes the accomplishment of work performed, results achieved, and products produced under Annex II, a project established under the Agreement for Cooperation in the Field of Renewable Energy Research and Development between the Kingdom of Saudi Arabia and the United States. The report covers work and accomplishments from January 1998 to December 2000. A previous progress report, Progress Report for Annex II - Assessment of Solar Radiation Resources in Saudi Arabia 1993-1997, NREL/TP-560-29374, summarizes earlier work and technical transfer of information under the project.more » The work was performed in at the National Renewable Energy Laboratory (NREL) in Golden, Colorado, at the King Abdulaziz City for Science and Technology (KACST) in Riyadh, Saudi Arabia, and at selected weather stations of the Saudi Meteorological and Environmental Protection Administration (MEPA).« less

  7. Situation Awareness and Interruption Handling During Medication Administration.

    PubMed

    Sitterding, Mary Cathryn; Ebright, Patricia; Broome, Marion; Patterson, Emily S; Wuchner, Staci

    2014-08-01

    Medication administration error remains a leading cause of preventable death. A gap exists in understanding attentional dynamics, such as nurse situation awareness (SA) while managing interruptions during medication administration. The aim was to describe SA during medication administration and interruption handling strategies. A cross-sectional, descriptive design was used. Cognitive task analysis (CTA) methods informed analysis of 230 interruptions. Themes were analyzed by SA level. The nature of the stimuli noticed emerged as a Level 1 theme, in contrast to themes of uncertainty, relevance, and expectations (Level 2 themes). Projected or anticipated interventions (Level 3 themes) reflected workload balance between team and patient foregrounds. The prevalence of cognitive time-sharing during the medication administration process was remarkable. Findings substantiated the importance of the concept of SA within nursing as well as the contribution of CTA in understanding the cognitive work of nursing during medication administration. © The Author(s) 2014.

  8. 78 FR 48670 - Boulder Canyon Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-09

    ... DEPARTMENT OF ENERGY Western Area Power Administration Boulder Canyon Project AGENCY: Western Area... Canyon Project (BCP) electric service provided by the Western Area Power Administration (Western). The... States Department of Energy, Western Area Power Administration, Boulder Canyon Project, 133 FERC ] 62,229...

  9. Conceptual Frameworks for Child Care Decision-Making. White Paper

    ERIC Educational Resources Information Center

    Chaudry, Ajay; Henly, Julia; Meyers, Marcia

    2010-01-01

    This working paper is one in a series of projects initiated by the Administration for Children and Families (ACF) to improve knowledge for child care researchers and policy makers about parental child care decision making. In this paper, the authors identify three distinct conceptual frameworks for understanding child care decisions--a rational…

  10. Muscogee Nation Indian Territory: From Oral History to Found Poetry

    ERIC Educational Resources Information Center

    Treat, James

    2017-01-01

    The Indian-Pioneer History Project began in the spring of 1937, when scores of young field workers set out to interview elderly Oklahomans who could recall life during territorial days. Funded by the federal government's Works Progress Administration and sponsored by the Oklahoma Historical Society (OHS) in cooperation with the University of…

  11. Federal Programs Which May Support the Training of Neighborhood Residents for Jobs in Neighborhood Health Centers.

    ERIC Educational Resources Information Center

    Office of Economic Opportunity, Washington, DC. Community Action Program.

    The following programs are included: (1) Manpower Development and Training Act, (2) New Careers, (3) Vocational and Technical Education, (4) Work Incentive (WIN), (5) Neighborhood Youth Corps, (6) Demonstration Projects, and (7) Veterans Administration Training Assistance. Information about each program includes nature and purpose, national and…

  12. Travel, Tourism, and Geographic Field Work: Project Marco Polo 1992.

    ERIC Educational Resources Information Center

    Lanegran, David A.; St. Peter, Patrice H.

    1993-01-01

    Describes a 3-week study tour of Egypt and Greece by 15 geography teachers, 15 students, and 5 administrators during summer 1992. Discusses nine processes that were used to provide structure for the trip's events. Concludes that a geography teacher's task is to evoke in students the spirit of the traveler. (CFR)

  13. New Whole-House Solutions Case Study: Northwest Energy Efficient Manufactured Housing Program High-Performance Test Homes - Pacific Northwest

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2015-05-01

    This project represents the third phase of a multi-year effort to develop and bring to market a High Performance Manufactured Home (HPMH). In this project, the Northwest Energy Efficient Manufactured Housing Program worked with Building America Partnership for Improved Residential Construction and Bonneville Power Administration to help four factory homebuilders build prototype zero energy ready manufactured homes, resulting in what is expected to be a 30% savings relative to the Building America Benchmark. (The actual % savings varies depending on choice of heating equipment and climate zone). Previous phases of this project created a HPMH specification and prototyped individual measuresmore » from the package to obtain engineering approvals and develop preliminary factory construction processes. This case study describes the project team's work during 2014 to build prototype homes to the HPMH specifications and to monitor the homes for energy performance and durability. Monitoring is expected to continue into 2016.« less

  14. Between demarcation and discretion: The medical-administrative boundary as a locus of safety in high-volume organisational routines.

    PubMed

    Grant, Suzanne; Guthrie, Bruce

    2018-04-01

    Patient safety is an increasing concern for health systems internationally. The majority of administrative work in UK general practice takes place in the context of organisational routines such as repeat prescribing and test results handling, where high workloads and increased clinician dependency on administrative staff have been identified as an emerging safety issue. Despite this trend, most research to date has focused on the redistribution of the clinical workload between doctors, nurses and allied health professionals within individual care settings. Drawing on Strauss's negotiated order perspective, we examine ethnographically the achievement of safety across the medical-administrative boundary in key high-volume routines in UK general practice. We focus on two main issues. First, GPs engaged in strategies of demarcation by defining receptionist work as routine, unspecialised and dependent upon GP clinical knowledge and oversight as the safety net to deal with complexity and risk. Receptionists consented to this 'social closure' when describing their role, thus reinforcing the underlying inter-occupational relationship of medical domination. Second, in everyday practice, GPs and receptionists engaged in informal boundary-blurring to safely accommodate the complexity of everyday high-volume routine work. This comprised additional informal discretionary spaces for receptionist decision-making and action that went beyond the routine safety work formally assigned to them. New restratified intra-occupational hierarchies were also being created between receptionists based on the complexity of the safety work that they were authorised to do at practice level, with specialised roles constituting a new form of administrative 'professional project'. The article advances negotiated order theory by providing an in-depth examination of the ways in which medical-administrative boundary-making and boundary-blurring constitute distinct modes of safety in high-volume routines. It also provides the basis for further research and safety improvement to maximise team-level understandings of the pivotal role of medical-administrative negotiations in achieving safety and mitigating risk. Copyright © 2018 Elsevier Ltd. All rights reserved.

  15. Nez Perce Tribal Hatchery Project : Combined-Planning & Design and Operations & Maintenance Reports, 2000 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larson, Roy Edward; Walker, Grant W.

    2002-12-31

    Nez Perce Tribal Hatchery (NPTH) Year-2000 Combined Maintenance and Operations (O&M) and Planning and Design (P&D) contract is hereby completed based on this annual report patterned after the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration. Primary project activities focused on completion of the Northwest Power Planning Council Step-3 process that: (1) Accepted final design, (2) Authorized a capital construction amount of $16,050,000, and (3) Authorized contractor selection, and (4) Provided construction site dedication, and (5) Implemented construction activities over an anticipated 2-year period of July 2000 through October 2002.

  16. E-Labs - Learning with Authentic Data

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bardeen, Marjorie G.; Wayne, Mitchell

    the success teachers have had providing an opportunity for students to: • Organize and conduct authentic research. • Experience the environment of scientific collaborations. • Possibly make real contributions to a burgeoning scientific field. We've created projects that are problem-based, student driven and technology dependent. Students reach beyond classroom walls to explore data with other students and experts and share results, publishing original work to a worldwide audience. Students can discover and extend the research of other students, modeling the processes of modern, large-scale research projects. From start to finish e-Labs are student-led, teacher-guided projects. Students need only a Webmore » browser to access computing techniques employed by professional researchers. A Project Map with milestones allows students to set the research plan rather than follow a step-by-step process common in other online projects. Most importantly, e-Labs build the learning experience around the students' own questions and let them use the very tools that scientists use. Students contribute to and access shared data, most derived from professional research databases. They use common analysis tools, store their work and use metadata to discover, replicate and confirm the research of others. This is where real scientific collaboration begins. Using online tools, students correspond with other research groups, post comments and questions, prepare summary reports, and in general participate in the part of scientific research that is often left out of classroom experiments. Teaching tools such as student and teacher logbooks, pre- and post-tests and an assessment rubric aligned with learner outcomes help teachers guide student work. Constraints on interface designs and administrative tools such as registration databases give teachers the "one-stop-shopping" they seek for multiple e-Labs. Teaching and administrative tools also allow us to track usage and assess the impact on student learning.« less

  17. 23 CFR 940.13 - Project administration.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Project administration. 940.13 Section 940.13 Highways... INTELLIGENT TRANSPORTATION SYSTEM ARCHITECTURE AND STANDARDS § 940.13 Project administration. (a) Prior to authorization of highway trust funds for construction or implementation of ITS projects, compliance with § 940...

  18. 23 CFR 660.515 - Project administration.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Project administration. 660.515 Section 660.515 Highways... PROGRAMS (DIRECT FEDERAL) Defense Access Roads § 660.515 Project administration. (a) Determination of the agency best able to accomplish the location, design, and construction of the projects covered by this...

  19. 23 CFR 660.515 - Project administration.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Project administration. 660.515 Section 660.515 Highways... PROGRAMS (DIRECT FEDERAL) Defense Access Roads § 660.515 Project administration. (a) Determination of the agency best able to accomplish the location, design, and construction of the projects covered by this...

  20. 23 CFR 660.515 - Project administration.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Project administration. 660.515 Section 660.515 Highways... PROGRAMS (DIRECT FEDERAL) Defense Access Roads § 660.515 Project administration. (a) Determination of the agency best able to accomplish the location, design, and construction of the projects covered by this...

  1. 23 CFR 660.515 - Project administration.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Project administration. 660.515 Section 660.515 Highways... PROGRAMS (DIRECT FEDERAL) Defense Access Roads § 660.515 Project administration. (a) Determination of the agency best able to accomplish the location, design, and construction of the projects covered by this...

  2. Spreading a medication administration intervention organizationwide in six hospitals.

    PubMed

    Kliger, Julie; Singer, Sara; Hoffman, Frank; O'Neil, Edward

    2012-02-01

    Six hospitals from the San Francisco Bay Area participated in a 12-month quality improvement project conducted by the Integrated Nurse Leadership Program (INLP). A quality improvement intervention that focused on improving medication administration accuracy was spread from two pilot units to all inpatient units in the hospitals. INLP developed a 12-month curriculum, presented in a combination of off-site training sessions and hospital-based training and consultant-led meetings, to teach clinicians the key skills needed to drive organizationwide change. Each hospital established a nurse-led project team, as well as unit teams to address six safety processes designed to improve medication administration accuracy: compare medication to the medication administration record; keep medication labeled throughout; check two patient identifications; explain drug to patient (if applicable); chart immediately after administration; and protect process from distractions and interruptions. From baseline until one year after project completion, the six hospitals improved their medication accuracy rates, on average, from 83.4% to 98.0% in the spread units. The spread units also improved safety processes overall from 83.1% to 97.2%. During the same time, the initial pilot units also continued to improve accuracy from 94.0% to 96.8% and safety processes overall from 95.3% to 97.2%. With thoughtful planning, engaging those doing the work early and focusing on the "human side of change" along with technical knowledge of improvement methodologies, organizations can spread initiatives enterprisewide. This program required significant training of frontline workers in problem-solving skills, leading change, team management, data tracking, and communication.

  3. Whose Community are You Working for? A Change Agent Case Study.

    PubMed

    Silva, Janelle M

    2017-12-01

    This article explores the role and responsibility of the community psychologist in creating change that could potentially harm the group they are meant to be in solidarity with. Drawing upon a 2-year project with a Latinx Student Union at a public middle school in the Pacific Northwest, I examine the ethical dilemmas that arose when powerful stakeholders (school administration) changed the goals and intention of the research project without the consent of the low-power stakeholders (the students). This narrative seeks to shed light on the dilemmas that come with being an ethical community psychologist (Balcazar, Garate-Serafini, & Keys, 2004; Nelson, Prilleltensky, & MacGillivary, 2001; O'Neill, 1989), how these ethics can be compromised by one's identity, and what it means to work for/with/against one's community when deciding whether to stay with or leave a project. © Society for Community Research and Action 2017.

  4. Reengineering a database for clinical trials management: lessons for system architects.

    PubMed

    Brandt, C A; Nadkarni, P; Marenco, L; Karras, B T; Lu, C; Schacter, L; Fisk, J M; Miller, P L

    2000-10-01

    This paper describes the process of enhancing Trial/DB, a database system for clinical studies management. The system's enhancements have been driven by the need to maximize the effectiveness of developer personnel in supporting numerous and diverse users, of study designers in setting up new studies, and of administrators in managing ongoing studies. Trial/DB was originally designed to work over a local area network within a single institution, and basic architectural changes were necessary to make it work over the Internet efficiently as well as securely. Further, as its use spread to diverse communities of users, changes were made to let the processes of study design and project management adapt to the working styles of the principal investigators and administrators for each study. The lessons learned in the process should prove instructive for system architects as well as managers of electronic patient record systems.

  5. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1994.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1994-02-01

    This document is part of Bonneville Power Administration`s program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. The Fiscal Year 1994 (FY 1994) Annual Implementation Work Plan (AIWP) presents Bonneville Power Administration`s (BPA`s) plan for implementation of the Columbia River Basin Fish and Wildlife Program (Program). The purpose of the Program is to guide BPA and other federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife in the Columbia River Basin. Phase I began the work of salmonmore » recovery with certain fast-track measures completed in August 1991. Phase II dealt with Snake and Columbia river flow and salmon harvest and was completed in December 1991. Phase III dealt with system-wide habitat and salmon production issues and was completed in September 1992. Phase IV planning, focusing on resident fish and wildlife, began in August 1993, and was finished and adopted in November 1993. This report provides summaries of the ongoing and new projects for FY 1994 within the areas of juvenile migration, adult migration, salmon harvest, production and habitat, coordinated implementation, monitoring and evaluation, resident fish, and wildlife.« less

  6. Collaboration: integrating practice and research in public health nursing.

    PubMed

    Henry, V; Schmitz, K; Reif, L; Rudie, P

    1992-12-01

    The need to integrate clinical practice and research has been stressed for many years in both public health and nursing. This article describes such a collaborative project between two rural upper Midwest public health nursing agencies and public health nursing faculty from a small, liberal arts, baccalaureate nursing program. The high-risk prenatal research project provided an opportunity for nursing staff and faculty research consultants to work together on a clinical study. A model for collaborative research is illustrated, and advantages and disadvantages for practice, administration, and research are discussed.

  7. Spaceport Command and Control System Automation Testing

    NASA Technical Reports Server (NTRS)

    Plano, Tom

    2017-01-01

    The goal of automated testing is to create and maintain a cohesive infrastructure of robust tests that could be run independently on a software package in its entirety. To that end, the Spaceport Command and Control System (SCCS) project at the National Aeronautics and Space Administration's (NASA) Kennedy Space Center (KSC) has brought in a large group of interns to work side-by-side with full time employees to do just this work. Thus, our job is to implement the tests that will put SCCS through its paces.

  8. Long-Time Scientist Works to Prove Chemistry’s Place in Cancer Research | Poster

    Cancer.gov

    By Carolynne Keenan, Contributing Writer When Larry Keefer, Ph.D., first arrived at the National Cancer Institute (NCI) more than 40 years ago, he didn’t have a physical lab to call his own. Not immediately, anyway, due to a glitch in the construction schedule, he explained.                   So he spent his first few years in Bethesda doing administrative work, like reviewing proposals and serving as a project officer on contracts.

  9. School Community Engaging with Immigrant Youth: Incorporating Personal/Social Development and Ethnic Identity Development

    ERIC Educational Resources Information Center

    Gonzalez, Laura M.; Eades, Mark P.; Supple, Andrew J.

    2014-01-01

    It has been projected that 33% of all school children will be from immigrant households by the year 2040 (Suarez-Orozco et al., 2010). For school personnel (e.g., administrators, counselors, teachers) working with immigrant youth and adolescents, understanding ethnic identity development is an essential cultural competency. In this essay, the…

  10. Fifty Indices of Effectiveness Regarding the Program Advisory Committees in Minnesota's Technical Colleges: A Working Paper. Effective Advisory Committees Project.

    ERIC Educational Resources Information Center

    Mercer, John W.; Meunier, Greg R.

    This document, which was developed by a task force whose members represent the instructional, student support service, administrative, and executive ranks of technical colleges with very diverse sizes, locations, and programs, lists 50 proposed indices of effectiveness regarding the program advisory committees (ACs) in Minnesota's technical…

  11. State Secondary CTE Standards: Developing a Framework out of a Patchwork of Policies

    ERIC Educational Resources Information Center

    Castellano, Marisa; Harrison, Linda; Schneider, Sherrie

    2007-01-01

    Many state educational administrators are currently working to define secondary career and technical education (CTE) content standards that specify the knowledge and skills students are expected to master in CTE program areas. The two-phase project on which this report is based explored (a) the progress and status of states in developing statewide…

  12. Making It Work: The Education and Employment of Recent Arts Graduates. Annual Report 2014

    ERIC Educational Resources Information Center

    Lena, Jennifer C.

    2014-01-01

    The Strategic National Arts Alumni Project (SNAAP) is a comprehensive survey administered online to the arts alumni of participating institutions. Completion time for the survey is generally 20 to 30 minutes. The results described in this report are based on data collected from the 2011, 2012, and 2013 annual survey administrations. This report…

  13. 40 CFR 35.909 - Step 2+3 grants.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Step 2+3 grants. 35.909 Section 35.909... ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.909 Step 2+3 grants. (a) Authority. The Regional Administrator may award grant assistance for a step 2=3 project for the combination of...

  14. Association of Small Computer Users in Education (ASCUE) Summer Conference. Proceedings (25th, North Myrtle Beach, South Carolina, June 21-25, 1992).

    ERIC Educational Resources Information Center

    Association of Small Computer Users in Education, Greencastle, IN.

    Forty-three papers from a conference on microcomputers are presented under the following headings: Computing in the Curriculum, Information and Computer Science Information; Institutional and Administrative Computing, and Management, Services, and Training. Topics of the papers include the following: telecommunications projects that work in…

  15. Preliminary Evaluation Report on the Los Angeles City Schools SB 28 Demonstration Program in Mathematics. CSE Working Paper No. 1.

    ERIC Educational Resources Information Center

    Gordon, C. Wayne

    The objectives of the Los Angeles Model Mathematics Project (LAMMP) are stated by the administration as improvement of mathematical skills and understanding of mathematical concepts; improvement of the pupils' self-image; identification of specific assets and limitations relating to the learning process; development and use of special…

  16. To authorize the Administrator of the Environmental Protection Agency to award grants for electronic device recycling research, development, and demonstration projects, and for other purposes.

    THOMAS, 111th Congress

    Rep. Gordon, Bart [D-TN-6

    2009-03-18

    Senate - 04/23/2009 Received in the Senate and Read twice and referred to the Committee on Environment and Public Works. (All Actions) Tracker: This bill has the status Passed HouseHere are the steps for Status of Legislation:

  17. Avoidable interruptions during drug administration in an intensive rehabilitation ward: improvement project.

    PubMed

    Buchini, Sara; Quattrin, Rosanna

    2012-04-01

    To record the frequency of interruptions and their causes, to identify 'avoidable' interruptions and to build an improvement project to reduce 'avoidable' interruptions. In Italy each year 30,000-35,000 deaths per year are attributed to health-care system errors, of which 19% are caused by medication errors. The factors that contribute to drug management error also include interruptions and carelessness during treatment administration. A descriptive study design was used to record the frequency of interruptions and their causes and to identify 'avoidable' interruptions in an intensive rehabilitation ward in Northern Italy. A data collection grid was used to record the data over a 6-month period. A total of 3000 work hours were observed. During the study period 1170 interruptions were observed. The study identified 14 causes of interruption. The study shows that of the 14 cases of interruptions at least nine can be defined as 'avoidable'. An improvement project has been proposed to reduce unnecessary interruptions and distractions to avoid making errors. An additional useful step to reduce the incidence of treatment errors would be to implement the use of a single patient medication sheet for the recording of drug prescription, preparation and administration and also the incident reporting. © 2011 Blackwell Publishing Ltd.

  18. The GIIDA (Management of the CNR Environmental Data for Interoperability) project

    NASA Astrophysics Data System (ADS)

    Nativi, S.

    2009-04-01

    This work presents the GIIDA (Gestione Integrata e Interoperativa dei Dati Ambientali del CNR) inter-departimental project of the Italian National Research Council (CNR). The project is an initiative of the Earth and Environment Department (Dipartimento Terra e Ambiente) of the CNR. GIIDA mission is "To implement the Spatial Information Infrastructure (SII) of CNR for Environmental and Earth Observation data". The project aims to design and develop a multidisciplinary cyber-infrastructure for the management, processing and evaluation of Earth and environmental data. This infrastructure will contribute to the Italian presence in international projects and initiatives, such as: INSPIRE, GMES, GEOSS and SEIS. The main GIIDA goals are: • Networking: To create a network of CNR Institutes for implementing a common information space and sharing spatial resources. • Observation: Re-engineering the environmental observation system of CNR • Modeling: Re-engineering the environmental modeling system del CNR • Processing: Re-engineering the environmental processing system del CNR • Mediation: To define mediation methods and instruments for implementing the international interoperability standards. The project started in July 2008 releasing a specification document of the GIIDA architecture for interoperability and security. Based on these documents, a Call for Proposals was issued in September 2008. GIIDA received 23 proposed pilots from 16 different Institutes belonging to five CNR Departments and from 15 non-CNR Institutions (e.g. three Italian regional administrations, three national research centers, four universities, some SMEs). These pilot were divided into thematic areas. In fact, GIIDA considers seven main thematic areas/domains: • Biodiversity; • Climate Changes; • Air Quality; • Soil and Water Quality; • Risks; • Infrastructures for Research and Public Administrations; • Sea and Marine resources Each of these thematic areas is covered by a Working Group which coordinates the activities and the achievements of the respective pilots. Working Groups are called to develop for each area: 1) a specific Web Portal; 2) a thematic catalog service; 3) a thematic thesaurus service; 4) a thematic Wiki; 5) standard access and view services for thematic resources -such as: datasets, models, and processing services; 6) a couple of significant use scenarios to be demonstrated.

  19. Support of US CLIVAR Project Office 2012

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cummings, Donna

    Director of JOSS, supervised the U.S. CLIVAR Project Office Director and helped direct the officer to enhance the goals and objectives of the U.S. CLIVAR Project and budget. Financial Manager of JOSS, worked to complete proposals and monitor compliance with award requirements and funding limitations and ensure the U.S. CLIVAR Project Office complied with UCAR policies and procedures. Project Coordinator administered the funding for the U.S. CLIVAR Project Office and was responsible for coordinating special projects that required additional support from JOSS technical staff. These projects included activities such as website updates, technology upgrades, production of printed reports, and developmentmore » of graphic elements like logos. Web Developer worked both on web development and graphic work and the work consisted of the following: Maintaining the site ? installing updates to Drupal CMS (Content Management System). Creating new templates for webpages and styling them with CSS and JavaScript/jQuery code. Fixing the styling on webpages that the content contributor/manager (Jenn Mays) created and has had trouble with. Creating new web forms for abstract uploading, subscriptions, and meeting registrations. Created 4 webpages for the ?ASP: Key Uncertainties in the Global Carbon-Cycle? meeting. Developed a document review form, instruction webpages, login redirect, dynamic table with form submissions for the US CLIVAR SSC Science Plan Document Review. This was open to the public from June 12, 2013 until July 10, 2013. During this time the user accounts had to be checked (daily) that were created by the public, to delete any spam ones. Graphics work: preparing images for general use on webpages, webpage banners, and for meeting name badges, creating a US CLIVAR letterhead, redesigning the US AMOC logo. System Administrator spent time working on the migration of the US CLIVAR site from the USGCRP office to UCAR here Boulder. This was done to increase the general speed of the site & to allow the web developer to work in it more efficiently. Main tasks were to Archive the old Site, create new development site for web developer, and move web address to new website when web developer was finished with development. There are no patients or equipment related to this proposals« less

  20. Small business innovation research: Abstracts of 1984. Phase 1 awards

    NASA Technical Reports Server (NTRS)

    1985-01-01

    On September 27, 1984, the National Aeronautics and Space Administration announced the selection of Phase I projects for the Small Business Innovation Research Program. These awards resulted from the evaluation of proposals submitted in response to the 1984 Program Solicitation, SBIR 84-1. In order to make available information on the technical content of the Phase I projects supported by the NASA SBIR Program, the abstracts of those proposals which resulted in awards of contracts are given. In addition, the name and address of the firm performing the work are given for those who may desired additional information about the project. Propulsion, aerodynamics, computer techniques, exobiology and composite materials are among the areas covered.

  1. Engaging Communities to Develop and Sustain Comprehensive Wellness Policies: Louisiana’s Schools Putting Prevention to Work

    PubMed Central

    Kennedy, Betty Monroe; Bourgeois, Brandi F.; Broyles, Stephanie T.; Katzmarzyk, Peter T.

    2014-01-01

    Background Tobacco use, obesity, and physical inactivity among Louisiana’s youth pose a serious public health problem. Given the potential of school environments to affect student well-being, the Louisiana Tobacco Control Program developed and tested a pilot program, Schools Putting Prevention to Work. The objective was to assist school districts in developing a comprehensive school wellness policy and engaging their school community to generate environments that support healthful choices and behaviors. Community Context The pilot was implemented in 27 school districts, reaching an estimated 325,000 people across the state. Demographics of participating students were similar to all Louisiana’s public school students. Methods A school wellness project state team advised project development. A subgroup that included contractors and partners implemented and modified the pilot. Sites were selected though an application process. Site representatives received trainings, technical assistance, and funding to organize school-based support-building activities and coordinate a school health advisory council to develop policy and sustain healthy school environments. Project sites reported progress monthly; evaluation included data from sites and project administrators. Outcome Twenty-five comprehensive school wellness policies (covering 100% tobacco-free schools and daily physical activity and healthier cafeteria items) were approved by school boards. Environmental changes such as physical activity breaks, healthier vending options, and tobacco-free campuses were adopted. Interpretation This pilot demonstrated a successful approach to achieving policy and environmental change. The state team engaged and guided school districts to motivate students, parents, faculty/staff/administration, and businesses to establish and maintain opportunities to improve lifestyle health. PMID:24602588

  2. Privacy by Design at Population Data BC: a case study describing the technical, administrative, and physical controls for privacy-sensitive secondary use of personal information for research in the public interest.

    PubMed

    Pencarrick Hertzman, Caitlin; Meagher, Nancy; McGrail, Kimberlyn M

    2013-01-01

    Population Data BC (PopData) is an innovative leader in facilitating access to linked data for population health research. Researchers from academic institutions across Canada work with PopData to submit data access requests for projects involving linked administrative data, with or without their own researcher-collected data. PopData and its predecessor-the British Columbia Linked Health Database-have facilitated over 350 research projects analyzing a broad spectrum of population health issues. PopData embeds privacy in every aspect of its operations. This case study focuses on how implementing the Privacy by Design model protects privacy while supporting access to individual-level data for research in the public interest. It explores challenges presented by legislation, stewardship, and public perception and demonstrates how PopData achieves both operational efficiencies and due diligence.

  3. Privacy by Design at Population Data BC: a case study describing the technical, administrative, and physical controls for privacy-sensitive secondary use of personal information for research in the public interest

    PubMed Central

    Pencarrick Hertzman, Caitlin; Meagher, Nancy; McGrail, Kimberlyn M

    2013-01-01

    Population Data BC (PopData) is an innovative leader in facilitating access to linked data for population health research. Researchers from academic institutions across Canada work with PopData to submit data access requests for projects involving linked administrative data, with or without their own researcher-collected data. PopData and its predecessor—the British Columbia Linked Health Database—have facilitated over 350 research projects analyzing a broad spectrum of population health issues. PopData embeds privacy in every aspect of its operations. This case study focuses on how implementing the Privacy by Design model protects privacy while supporting access to individual-level data for research in the public interest. It explores challenges presented by legislation, stewardship, and public perception and demonstrates how PopData achieves both operational efficiencies and due diligence. PMID:22935136

  4. Making sausage--effective management of enterprise-wide clinical IT projects.

    PubMed

    Smaltz, Detlev H; Callander, Rhonda; Turner, Melanie; Kennamer, Gretchen; Wurtz, Heidi; Bowen, Alan; Waldrum, Mike R

    2005-01-01

    Unlike most other industries in which company employees are, well, company employees, U.S. hospitals are typically run by both employees (nurses, technicians, and administrative staff) and independent entrepreneurs (physicians and nurse practitioners). Therefore, major enterprise-wide clinical IT projects can never simply be implemented by mandate. Project management processes in these environments must rely on methods that influence adoption rather than presume adoption will occur. "Build it and they will come" does not work in a hospital setting. This paper outlines a large academic medical center's experiences in managing an enterprise-wide project to replace its core clinical systems functionality. Best practices include developing a cogent optimal future-state vision, communications planning and execution, vendor validation against the optimal future-state vision, and benefits realization assessment.

  5. Medication room madness: calming the chaos.

    PubMed

    Conrad, Carole; Fields, Willa; McNamara, Tracey; Cone, Maryann; Atkins, Patricia

    2010-01-01

    Nurses work in stressful environments, encountering interruptions and distractions at almost every turn. The aim of this medication safety project was to improve the physical design and organizational layout of the medication room, reduce nurse interruptions and distractions, and create a standard medication process for enhanced patient safety and efficiency. This successful change improved the medication administration process, decreased medication errors, and enhanced nursing satisfaction.

  6. US nuclear repository in jeopardy

    NASA Astrophysics Data System (ADS)

    Gwynne, Peter

    2009-04-01

    Physicists have expressed uneasiness about the future of nuclear-waste storage in the US after President Barack Obama's administration proposed slashing funds for a long-planned repository at Yucca Mountain in Nevada. If approved by Congress, the cuts seem likely to spell the death knell of the project, which has been in the works since 1987 and has so far cost the government 9.5bn.

  7. Proposed State Budget Improves Outlook for Kids, but Leaves Much Work to Be Done

    ERIC Educational Resources Information Center

    Children Now, 2013

    2013-01-01

    For the first time in many years, the Administration's proposed state budget does not project a deficit. Painful budget cutting in recent years combined with voters passing Proposition 30 in November to generate revenues finally have put California on more stable fiscal ground. However, it is critical to recognize that kids have borne a…

  8. Counter Tunnel Project

    DTIC Science & Technology

    2014-03-01

    ADMINISTRATIVE INFORMATION The work described in this report was performed by the Unmanned Systems Science & Technology Branch (Code 71710) and the...Unmanned Systems Advanced Development Branch (Code 71720), Space and Naval Warfare Systems Center Pacific (SSC Pacific), San Diego, CA, and the Air...Earth™ is a trademark of Google Inc. Released by T. Pastore, Head Unmanned Systems Science & Technology Branch Under authority of A. D

  9. From Constructs to Measures: Finalizing the Common Core. The Project on State-Level Child Outcomes.

    ERIC Educational Resources Information Center

    Child Trends, Inc., Washington, DC.

    The U.S. Department of Health and Human Services' Office of Planning, Research, and Evaluation at the Administration for Children and Families, and the Office of the Assistant Secretary for Planning and Evaluation, are working together with states and other groups to improve the measurement of child outcomes in state welfare evaluations and in…

  10. Grounding Undns

    DTIC Science & Technology

    2012-01-01

    PROJECT NUMBER BYU1 5e. TASK NUMBER MA 5f. WORK UNIT NUMBER RY 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) University of Maryland Office of...Research Administration & Advancement College Park MD 20742-5100 8. PERFORMING ORGANIZATION REPORT NUMBER N/A 9. SPONSORING...Armed with these metrics, the Undns ruleset is better revised, vestigial rules removed or demoted for maintenance, and redundant locations distinguished

  11. Challenge of Professionalism. Proceedings of the Annual Meeting of the Association of Physical Plant Administrators of Universities and Colleges (71st, Columbus, Ohio, June 17-20, 1984).

    ERIC Educational Resources Information Center

    Howard, Steve, Comp.

    The challenge of professionalism is addressed in the 32 papers published in this Proceedings. The papers and their authors include: "New Concepts of Management: Challenges of Professionalism" (keynote address, Herman Birnbrauer); "Alternate Financing of Campus Projects" (F. Louis Fackler); "An Automated Work Order System…

  12. Sexual Harassment in the State Workforce. Results of a Survey. S.H.E. Project Report.

    ERIC Educational Resources Information Center

    Dunwoody-Miller, Vera; Gutek, Barbara A.

    State workers in California were surveyed to determine if they had been sexually harassed on the job, and what they knew about procedures and laws for dealing with such harassment. Responses were received from 1,151 professional and administrative employees representing a sexual and ethnic distribution similar to the total civil service work force…

  13. Tank waste remediation system configuration management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vann, J.M.

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Projectmore » personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.« less

  14. 76 FR 50813 - Major Capital Investment Projects; Guidance on News Starts/Small Starts Policies and Procedures

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-16

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Major Capital Investment Projects; Guidance on News Starts/Small Starts Policies and Procedures AGENCY: Federal Transit Administration (FTA... Administration (FTA) to publish policy guidance on the New and Small Starts capital project review and evaluation...

  15. Contextualizing and assessing the social capital of seniors in congregate housing residences: study design and methods

    PubMed Central

    Moore, Spencer; Shiell, Alan; Haines, Valerie; Riley, Therese; Collier, Carrie

    2005-01-01

    Background This article discusses the study design and methods used to contextualize and assess the social capital of seniors living in congregate housing residences in Calgary, Alberta. The project is being funded as a pilot project under the Institute of Aging, Canadian Institutes for Health Research. Design/Methods Working with seniors living in 5 congregate housing residencies in Calgary, the project uses a mixed method approach to develop grounded measures of the social capital of seniors. The project integrates both qualitative and quantitative methods in a 3-phase research design: 1) qualitative, 2) quantitative, and 3) qualitative. Phase 1 uses gender-specific focus groups; phase 2 involves the administration of individual surveys that include a social network module; and phase 3 uses anamolous-case interviews. Not only does the study design allow us to develop grounded measures of social capital but it also permits us to test how well the three methods work separately, and how well they fit together to achieve project goals. This article describes the selection of the study population, the multiple methods used in the research and a brief discussion of our conceptualization and measurement of social capital. PMID:15836784

  16. Apollo: Learning From the Past, For the Future

    NASA Technical Reports Server (NTRS)

    Grabois, Michael R.

    2009-01-01

    This paper shares an interesting and unique case study of knowledge capture by the National Aeronautics and Space Administration (NASA), an ongoing project to recapture and make available the lessons learned from the Apollo lunar landing project so that those working on future projects do not have to "reinvent the wheel". NASA's new Constellation program, the successor to the Space Shuttle program, proposes a return to the Moon using a new generation of vehicles. The Orion Crew Vehicle and the Altair Lunar Lander will use hardware, practices, and techniques descended and derived from Apollo, Shuttle and the International Space Station. However, the new generation of engineers and managers who will be working with Orion and Altair are largely from the decades following Apollo, and are likely not well aware of what was developed in the 1960s. In 2006 a project at NASA's Johnson Space Center was begun to find pertinent Apollo-era documentation and gather it, format it, and present it using modern tools for today's engineers and managers. This "Apollo Mission Familiarization for Constellation Personnel" project is accessible via the web from any NASA center for those interested in learning "how did we do this during Apollo?"

  17. Apollo: Learning From the Past, For the Future

    NASA Technical Reports Server (NTRS)

    Grabois, Michael R.

    2010-01-01

    This paper shares an interesting and unique case study of knowledge capture by the National Aeronautics and Space Administration (NASA), an ongoing project to recapture and make available the lessons learned from the Apollo lunar landing project so that those working on future projects do not have to "reinvent the wheel". NASA's new Constellation program, the successor to the Space Shuttle program, proposes a return to the Moon using a new generation of vehicles. The Orion Crew Vehicle and the Altair Lunar Lander will use hardware, practices, and techniques descended and derived from Apollo, Shuttle and the International Space Station. However, the new generation of engineers and managers who will be working with Orion and Altair are largely from the decades following Apollo, and are likely not well aware of what was developed in the 1960s. In 2006 a project at NASA's Johnson Space Center was begun to find pertinent Apollo-era documentation and gather it, format it, and present it using modern tools for today's engineers and managers. This "Apollo Mission Familiarization for Constellation Personnel" project is accessible via the web from any NASA center for those interested in learning "how did we do this during Apollo?"

  18. Audit Report on "Work for Others Performed by the Department of Energy for the Department of Defense"

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    Pursuant to the Atomic Energy Act of 1954, as amended, and the Economy Act of 1932, the Department of Energy and its semi-autonomous National Nuclear Security Administration (NNSA) provide research and technical assistance to other Federal agencies on a reimbursable, full cost recovery basis through the Work for Others (WFO) program. For the vast majority of WFO technical projects, Department Federal officials furnish administrative project oversight while the actual detailed scientific or technical work is completed by the Department's 'management and operating' contractors. These contractors are awarded a special contract type specifically created under the Federal Acquisition Regulation to managemore » and operate Department sites and facilities, including sophisticated laboratories and technical centers, on a government-owned, contractor-operated basis. With annual expenditures exceeding $1 billion, the Department of Defense (DoD) is one of the Department's largest WFO customers. Work performed for DoD at the Department's national laboratories and other facilities includes highly technical research in areas such as nuclear weapons systems, counter-terrorism, and in-theater troop support. The National Defense Authorization Act for Fiscal Year (FY) 2009, required the Inspectors General of the DoD and the Department to review procurement methods to determine whether the Department complied with DoD procurement requirements and/or whether alternative procurement policies were in place. In response, we focused our review on projects performed by NNSA because it completes the vast majority (approximately $900 million in FY 2008) of the Department's work for DoD. As part of this effort, and, at the specific request of the DoD Office of Inspector General (DoD OIG), we identified the universe of WFO technical projects that received new funding in the fourth quarter of FY 2008 at NNSA sites. We independently reviewed a judgmental sample of 11 projects selected by the DoD OIG to meet the objectives of this audit. Our review revealed that NNSA managed DoD WFO technical projects in a manner consistent with requirements of the Atomic Energy Act of 1954, the Federal Acquisition Regulation, and the Department's implementing guidance, the Department of Energy Acquisition Regulation. Because of the very nature of the Department's management and operating contracting model, WFO projects may not be technically compliant with DoD procurement regulations in certain instances. We found that NNSA did not let new contracts or task orders for the DoD WFO technical projects we reviewed and instead managed them under its existing internal control process as part of its management and operating contract structure. In one instance, we noted that the Department had, at DoD's request, supplemented its control structure to incorporate specific DoD procurement requirements. Senior Department of Energy procurement officials acknowledged that neither the Department nor NNSA modified their existing prime contracts to incorporate specific defense procurement requirements because such modifications would be inappropriate, costly, and inefficient. In short, they informed us that the Department had developed and implemented a series of controls designed to monitor overall contractor performance, including WFO technical projects. Department and NNSA officials noted, however, that they were willing to incorporate DoD specific requirements into work orders should DoD request and fund such efforts. Additional details regarding management of WFO technical projects are discussed in the body of this report.« less

  19. Projects in Technology Education and Fostering Learning: The Potential and Its Realization

    NASA Astrophysics Data System (ADS)

    Barak, Moshe; Shachar, Ahron

    2008-06-01

    The current study aimed at examining the efficacy of technological projects as learning tools by exploring the following questions: the extent to which projects in technology develop students as independent learners; the types of knowledge the students deal with in working on their projects; the role of problem-solving in technological projects; and how projects integrate into traditional schooling. The subjects were 53 high school (12th grade) students who prepared graduating projects in technology under the supervision of nine teachers. Data were collected by observing the students in the laboratory, administrating two questionnaires to both the students and the teachers, and analyzing 25 portfolios prepared by the students of their projects. The findings indicate that projects in technology provide a good opportunity to engage students in challenging tasks that enhance their learning skills. To maximize this potential, it is necessary to employ the project method from the early stages of learning technology. It is especially important that teachers having a strong engineering orientation also acquire pedagogical knowledge on issues such as fostering independent learning, creativity, peer learning and reflective practice in the technological classroom.

  20. 36 CFR 218.2 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ADMINISTRATIVE REVIEW PROCESSES Predecisional Administrative Review Process for Hazardous Fuel Reduction Projects... reduction project: A hazardous fuel reduction project authorized by the Healthy Forests Restoration Act of... reduction project pursuant to the HFRA. Decision notice (DN): A concise written record of a responsible...

  1. Component Design Report: International Transportation Energy Demand Determinants Model

    EIA Publications

    2017-01-01

    This Component Design Report discusses working design elements for a new model to replace the International Transportation Model (ITran) in the World Energy Projection System Plus (WEPS ) that is maintained by the U.S. Energy Information Administration. The key objective of the new International Transportation Energy Demand Determinants (ITEDD) model is to enable more rigorous, quantitative research related to energy consumption in the international transportation sectors.

  2. Council on Library Resources; 15th Annual Report for the Year Ending June 30, 1971.

    ERIC Educational Resources Information Center

    Council on Library Resources, Inc., Washington, DC.

    During the fiscal year covered by this report, the Council allocated $1,401,982 for the support of 32 new projects and continued or completed work on a number of others. In the area of administration and management, the Council is continuing the long-range program designed to help libraries make maximum use of available resources. Since 1968 the…

  3. 77 FR 48151 - Boulder Canyon Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-13

    ... DEPARTMENT OF ENERGY Western Area Power Administration Boulder Canyon Project AGENCY: Western Area... Canyon Project (BCP) electric service provided by the Western Area Power Administration (Western). The... INFORMATION: Hoover Dam, authorized by the Boulder Canyon Project Act (45 Stat. 1057, December 21, 1928), sits...

  4. U.S. National Academy panel reviews climate change science

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    Could the administration of George W. Bush, which has rejected the Kyoto Protocol to reduce worldwide emissions of greenhouse gases—and which has reneged on a campaign pledge to regulate U.S. carbon dioxide emissions—sincerely be seeking the facts about climate change in time for the resumption of international negotiations on the issue in July?That is the hope of an 11-member committee of the U.S. National Academy of Sciences (NAS) that is working on an incredibly fast-tracked report “The Science of Climate Change,” at the request of the administration. The project largely will review and synthesize findings from a number of earlier studies.

  5. 77 FR 26818 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-07

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Notice of Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... public transportation projects listed below. The actions on these projects, as well as the laws under...

  6. 28 CFR 512.17 - Monitoring approved research projects.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Monitoring approved research projects... MANAGEMENT AND ADMINISTRATION RESEARCH Research § 512.17 Monitoring approved research projects. The BRRB shall monitor all research projects for compliance with Bureau policies. At a minimum, yearly reviews...

  7. 28 CFR 512.17 - Monitoring approved research projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Monitoring approved research projects... MANAGEMENT AND ADMINISTRATION RESEARCH Research § 512.17 Monitoring approved research projects. The BRRB shall monitor all research projects for compliance with Bureau policies. At a minimum, yearly reviews...

  8. 28 CFR 512.17 - Monitoring approved research projects.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Monitoring approved research projects... MANAGEMENT AND ADMINISTRATION RESEARCH Research § 512.17 Monitoring approved research projects. The BRRB shall monitor all research projects for compliance with Bureau policies. At a minimum, yearly reviews...

  9. Dimensions of clinical nurse specialist work in the UK.

    PubMed

    Leary, Alison; Crouch, Heather; Lezard, Anthony; Rawcliffe, Chris; Boden, Louise; Richardson, Alison

    To model the work of clinical nurse specialists (CNSs) in the UK. This article examines data mined as part of a national project. The Pandora database was initially collected on a Microsoft Office Access database and subsequently, a Structured Query Language database in several iterations from June 2006 to September 2008. Pandora recorded CNS activity as a series of events with eight dimensions to each event. Data from this were mined to examine the complexity of CNS work. This study represents the work of 463 CNSs over 2,778 days in England, Scotland and Wales. Clinical work, including physical assessment, referral, symptom control and 'rescue' work, accounted for a large part of the CNS's role. Administration was the second highest workload, with about half of these administrative tasks identified as being suitable for secretarial staff to undertake. Research, education and consultation accounted for less time. A significant proportion of the nurses' clinical work is undertaken by telephone. CNSs in this study spent much of their time doing complex clinical work. Payment by Results (Department of Health 2006) should recognise the work undertaken by CNSs, particularly that done on the telephone. Complex clinical work by CNSs takes place in many different contexts using a wide range of interventions. The role of the CNS is complex and diverse, making comparisons of it difficult. More research needs to be done in relation to quality, safety and efficiency.

  10. Challenges of the Administrative Consultation Wiki Research Project as a Learning and Competences Development Method for MPA Students

    ERIC Educational Resources Information Center

    Kovac, Polonca; Stare, Janez

    2015-01-01

    Administrative Consultation Wiki (ACW) is a project run under the auspices of the Faculty of Administration and the Ministry of Public Administration in Slovenia since 2009. A crucial component thereof is the involvement of students of Master of Public Administration (MPA) degree programs to offer them an opportunity to develop competences in…

  11. Project Management Meets Change Management - A Success Story. Focus Area: Tech Perspectives TI012SN

    NASA Technical Reports Server (NTRS)

    Hall, Wayne

    2011-01-01

    Utilizing the concepts and terminology from Project Management, the process of planning and executing a Change Management (CM) Infrastructure improvement project is described. The primary audience for this presentation includes both experienced and relatively new CM administrators and their managers. It also includes anyone with an interest in the application of project management knowledge to CM administration. There are several benefits: the complexity of the CM tool technology is more manageable, CM administrators get to use project management knowledge to complete a project (not "firefighting"), improve relations with your customers (that means developers and managers), and get the opportunity to do it again.

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Gary E.; Diefenderfer, Heida L.

    This annual report is a deliverable for fiscal year 2007 (FY07) for Project 2002-077-00, Facilitation of the Estuary/Ocean Subgroup (EOS). The EOS is part of the research, monitoring, and evaluation (RME) effort of the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to responsibilities arising from the Endangered Species Act as a result of operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbiamore » River and estuary. In FY07, EOS project accomplishments included (1) subgroup meetings; (2) participation in the estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; (3) project management via the project tracking system, PISCES; (4) quarterly project status reports; and (5) a major revision to the Estuary RME Plan (new version September 2007) based on comments by EOS members and invited reviewers.« less

  13. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Gary E.; Diefenderfer, Heida L.

    This annual report is a deliverable for fiscal year 2007 (FY07) for Project 2002-077-00, Facilitation of the Estuary/Ocean Subgroup (EOS). The EOS is part of the research, monitoring, and evaluation (RME) effort the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to responsibilities arising from the Endangered Species Act as a result of operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbia Rivermore » and estuary. In FY07, EOS project accomplishments included 1) subgroup meetings; 2) participation in the estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; 3) project management via the project tracking system, PISCES; 4) quarterly project status reports; and 5) a major revision to the Estuary RME Plan (new version September 2007) based on comments by EOS members and invited reviewers.« less

  14. UCLA's outreach program of science education in the Los Angeles schools.

    PubMed

    Palacio-Cayetano, J; Kanowith-Klein, S; Stevens, R

    1999-04-01

    The UCLA School of Medicine's Interactive Multi-media Exercises (IMMEX) Project began its outreach into pre-college education in the Los Angeles area in 1993. The project provides a model in which software and technology are effectively intertwined with teaching, learning, and assessment (of both students' and teachers' performances) in the classroom. The project has evolved into a special collaboration between the medical school and Los Angeles teachers. UCLA faculty and staff work with science teachers and administrators from elementary, middle, and high schools. The program benefits ethnically and racially diverse groups of students in schools ranging from the inner city to the suburbs. The project's primary goal is to use technology to increase students' achievement and interest in science, including medicine, and thus move more students into the medical school pipeline. Evaluations from outside project evaluators (West Ed) as well as from teachers and IMMEX staff show that the project has already had a significant effect on teachers' professional development, classroom practice, and students' achievement in the Los Angeles area.

  15. Tulane/Xavier University hazardous materials in aquatic environments of the Mississippi River basin. Quarterly progress report, January 1--March 31, 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-05-17

    The objectives of this report are to provide the necessary administrative support to assure that the scientific and educational goals of the project are obtained and to assure that all Department of Energy reporting requirements and requests are fulfilled. The grant reporting is divided into three aspects: Collaborative Cluster projects, Initiation projects and Education projects. A cluster project is one or more closely related collaborative, multidisciplinary research projects in which a group of investigators employs a synergistic approach to the solution of problems in the same general area of research. The accomplishments this quarter of eleven cluster projects are presented.more » An initial project typically involves a single investigator. The purpose of the project is to undertake pilot work, lasting no more than one year, which will lead to the successful submission of an externally-funded proposal or the development of a collaborative cluster project. The accomplishments this quarter of eleven initiation projects are presented. The education projects are designed to develop courses with emphasis on environmental studies and/or to train students in areas of environmental research.« less

  16. TxDOT administration research : tasks completed in FY2009.

    DOT National Transportation Integrated Search

    2010-01-01

    Texas Department of Transportation (TxDOT) Project 0-6581-TI, TxDOT Administration : Research, encompasses multiple tasks that explore and support administrative aspects of : transportation research. : The project term began in October 2008 and has b...

  17. Migrant Education Administrative Guide.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Instruction, Raleigh. Div. of Compensatory Education.

    Relating specifically to the North Carolina migrant education program's administrative responsibilities, this guide is designed to aid administrators in program management, monitoring project activities, project evaluation, self-assessment, determining needs for training and staff development, site-visit preparation, policy development, and…

  18. Environmental Criteria in the Spanish Public Works Procurement Process.

    PubMed

    Fuentes-Bargues, José Luis; González-Cruz, Mª Carmen; González-Gaya, Cristina

    2017-02-18

    Green Public Procurement (GPP) is defined as a process of contracting products, services, and works with the least possible damage to the environment during their life cycle. In order to improve the knowledge about GPP, a study of the use of environmental tendering criteria in the Spanish public construction sector has been performed. The results of this study show that the use of environmental criteria in Spanish public sector construction procurement is low in comparison to a certain group of countries, known as "Green 7", in the European Union. Environmental criteria is the fourth criterion in importance, but its weight in the global of the process is much lower than other criteria such as price, memory of the construction process and the delivery time. National administrations use environmental criteria more frequently because they have more resources and staff training about environmental issues. Environmental criteria are more used in the tendering of civil projects and works whose budget exceeds ten million euro due to the environmental impact of these kind and/or size of projects.

  19. Tulane/Xavier Universities hazardous materials in aquatic environments of the Mississippi River Basin. Quarterly progress report, October 1, 1995--December 31, 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-12-31

    To provide the necessary administrative support to assure that the scientific and educational goals of the project are obtained and to assure that all Department of Energy reporting requirements and requests are fulfilled.The grant reporting is divided into three aspects: Collaborative Cluster projects, Initiation projects and Education projects. A cluster project is one or more closely related collaborative, multidisciplinary research projects in which a group of investigators employs a synergistic approach to the solution of problems in the same general area of research. An initiation project typically involves a single investigator. The purpose of the project is to undertaken pilotmore » work, lasting no more than one year, which will lead to the successful submission of an externally-funded proposal or the development of a collaborative cluster project. The education projects are designed to develop courses with emphasis on environmental studies and/or to train students in areas of environmental research. Accomplishments this quarter are: (1) Issued a request for proposals (RFP) to complete work during the next year of the project. Forty-two proposals were received in response to the RFP. (2) Selected and convened a panel of experts to review the proposals and make funding recommendations. (3) Assigned each proposal to two or more reviewers and sent copies of all proposals to each review panelist. (4) Interfaced with Oak Ridge National Laboratory regarding QA/QC issues related to sampling and analysis for the project. (5) Held numerous phone conversations with DOE representatives regarding funding allocations procedure changes as a result of the delays in the Federal budget and appropriations process this year. This quarterly report briefly describes research projects ongoing in this program.« less

  20. 76 FR 81011 - Notice of Final Federal Agency Actions on Proposed Light Rail Project in Washington

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ... on Proposed Light Rail Project in Washington AGENCY: Federal Highway Administration (FHWA... Light Rail Transit Project in King County Washington. These actions grant licenses, permits, and... Light Rail Transit Project, King County, WA. Federal Lead Agency: Federal Transit Administration (FTA...

  1. Project Administration Techniques for Successful Classroom Collaborative Writing.

    ERIC Educational Resources Information Center

    Kryder, LeeAnne Giannone

    1991-01-01

    Focuses on the collaborative writing done for a large report or proposal over a period of several weeks or months in a business writing course. Discusses short-term writing projects and nonwriting tasks for project administration, meeting management, student/instructor conference, project planning and time estimates, and oral presentations. (PRA)

  2. Summer Final Report

    NASA Technical Reports Server (NTRS)

    Makidi, Nitou

    2012-01-01

    The summer of 2012 has been filled with many memorable events and activities. As an intern, I had responsibilities that had to be fulfilled. My tour of duty was completed as an administrative student trainee in the Information Technology and Communications Services Business Office (IT-A). In accordance with the Business Objectives and Agreement of the Business Office and my performance plan, I was to provide business office support, improve business, project management, and technical work processes. With this being stated, I supported a project called "The Big Move Project" (TBMP), which will take course over the next several years. The Big Move Project is the planning of the Information Technology (IT) Directorate's relocation to various buildings in the course of upcoming years, when designs and the building of Central Campus have been completed. Working directly with my supervisor and the project manager, I was responsible for gathering both administrative and operational area requirements for the Information Technology (IT) Directorate, along with its outsourced support and contractors, such as IMCS, NICS, and ACES. My first action was to create rubrics that will serve as a guideline for the information that should be given by each branch of IT. After receiving that information via a few KAITS actions, I was able to start the consolidation process, and begin working on a presentation. A SharePoint was created shortly after for others to view the progression of the project, which I managed. During the consolidation ofthis information, I would occasionally present to the IT Deputy Director and IT Chiefs. The draft of this presentation was shown to employees of Center Operations (T A) and stakeholders-IT Chief Officers and contractor managers-in the relocation of IT to make them aware of what requirements must be met that will enable IT to be accommodated appropriately in the design of Central Campus Phase 11-the time in which IT and its contractors are scheduled to be relocated. Besides supporting TBMP, I also supported the Section 508 Policy Compliance Coordinator, R. Liang. Section 508 is a policy that requires employers to implement accessibility assurance of information and technology to disabled communities. On Thursday, July 19, 2012, I was able to go to Camp Boggy Creek-a camp for disabled children-for an education outreach, in collaboration with the Education Office. We shared with them information about how astronauts live and work in space, they were able to ride hovercrafts, build paper rockets, and then launch them outside. Although this outreach was quite fun with the kids at the camp, this was a learning opportunity to gain some insight to those with cognitive and physical disabilities, the problems they typically face, and in tum, how to accommodate those with disabilities in the work environment. In the process of implementing accessibility and Section 508 compliance, I attended various teleconferences, did field runs to supply closed-caption call phones to employees with limited hearing, and helped with the development of the charter ofthe Section 508 Compliance Working Group.

  3. 5 CFR 470.317 - Project evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Project evaluation. 470.317 Section 470.317 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration...

  4. The Climate Impacts Research Consortium: Lessons Learned from the Evaluation of Co-production projects

    NASA Astrophysics Data System (ADS)

    Sokolovska, I.; Andrepont, J. A.; Lach, D.

    2017-12-01

    The Pacific Northwest Climate Impacts Research Consortium (CIRC) is a climate-science-to-climate-action team funded by the National Oceanic and Atmospheric Administration (NOAA), member of NOAA's Regional Integrated Sciences and Assessments (RISA) program. The internal evaluation of the last 6 years of CIRC's work focused on the co-production of knowledge process. The evaluation was based on CIRC's Reflection and Logic model and used a mixed methods design. During regular monthly meetings in 2014/15, all CIRC PIs reflected on the co-production process and presented their evaluation of the projects they worked on. Additionally, we conducted semi-structured interviews with CIRC participants, purposefully targeting key informants. The Climate Impacts Research Consortium teams also administered surveys to assess participants' experiences of the coproduction process as they were engaging in it. Identifying and cultivating an informant from the local stakeholder group with deep, accessible roots within the target community can lead to better coproduction results than having to build those relationships from naught. Across projects, most participants agreed that the project increased their understanding of their area's hazards and by the end of the project most participants were confident the project would produce useful results for themselves. Finally, most participants intended to share what they had learned from this experience with their colleagues and we found that co-production built capacities necessary for communities to incorporate climate change in discussions even after the end of CIRC's participation. During the projects, the involvement of non-traditional participants along with experts was critical to success and a lot of work and preparation needs to be put into the planning of any co-production meeting to overcome various barriers to communication and build trust.

  5. Aircraft Survivability: Reclaiming the Low Altitude Battlespace. Fall 2003

    DTIC Science & Technology

    2003-01-01

    tt p: //j as .jc s. m il n by Charles Pedriani to Improve Commercial Aviation Security JASPO/NASA Cooperate The National Aeronautics and Space...Administration (NASA) Aviation Safety and Security Program Office announced its Aviation Security Project at a rollout work- shop in March 2003. The...and development efforts involving technology of interest. Overview of the NASA Aviation Security Initiative A systems approach will be used as

  6. Nourishing a partnership to improve middle school lunch options: a community-based participatory research project.

    PubMed

    Reich, Stephanie M; Kay, Joseph S; Lin, Grace C

    2015-01-01

    Community-based participatory research is predicated on building partnerships that tackle important issues to the community and effectively improve these issues. Community-based participatory research can also be an empowering experience, especially for children. This article describes a university-community partnership in which students at a low-income middle school worked to improve the quality of the cafeteria food provided to the 986 students eligible for free and reduced price lunches. The project led to menu changes, improved communication between youth, school administrators, and district staff, and enabled youth to enact school improvements that were beneficial for their health.

  7. Emerging Sealing Technologies Development

    NASA Technical Reports Server (NTRS)

    2005-01-01

    Under this Cooperative Agreement, the objective was to investigate several emerging sealing technologies of interest to the Mechanical Components Branch of National Aeronautics and Space Administration Glenn Research Center at Lewis Field (NASA GRC). The majority of the work conducted was to support the development of Solid Oxide Fuel Cells for application to aeronautic auxiliary power units, though technical investigations of interest to other groups and projects were also conducted. In general, accomplishments and results were periodically reported to the NASA Technical Monitor, the NASA GRC Seal Team staff, and NASA GRC project management. Several technical reports, journal articles, and presentations were given internally to NASA GRC and to the external public.

  8. Organizational ergonomics of occupational health methods and processes in a Brazilian oil refinery.

    PubMed

    Bau, Lucy M S; Farias, Jean P; Buso, Sandro A; Passero, Carolina R Marcon

    2012-01-01

    Organizational ergonomics refers to the optimization of social technical systems, including their organizational structures, policies and processes. The relevant topics include communications, management of resources, work projects, temporal organization of work, team work, participative project, new work paradigms, cooperative work, organizational culture, network organizations and quality management (IEA, 2000). The purpose of this study was the reorganization of the methods and processes of the occupational health sector (SMS/SO - Portuguese acronym of the area) of a petrochemical company. The work involved thirty professionals: a coordinator, two occupational physicians, one cardiologist, one occupational dentist, two occupational nurses, eleven occupational health technicians, one social worker, one nutritionist, one phonoaudiologist, one ophthalmologist, one biochemist, two ergonomists, three administrative assistants, one administrator and one psychologist, during a six-month period. The methodology that was used sought to establish a cooperative alliance focused on change, transformation and acquisition of skills, reflecting directly on the attitudes and performance of the leaderships and their work teams. In addition to the feedback practice, the following supporting tools were used for the study's success: "Functional Polyvalence Matrix", "Management of Failures", 5W2H", "6M", "5 Why" and "process mapping". The intended results after the organization ergonomics restructuring process will allow the leader to help his or her team to make a diagnosis of the problems, identify options, develop strategies, establish targets and action plans, remove barriers, review contexts and implement the business management fundaments: planning, organization, management, coordination and control. The transformation possibilities allow us to consider some hypothesis: Before: Focus only on results. After: Engage collaborators to create sustainable results. Before: Operating profile. After: Tactical/strategic profile. Before: Find errors. After: Value effort and development. Before: Listen to what is being said. After: Understand what is being said. Before: Create fears of the consequences. After: Create room for risk. Before: Be the one who approves and decides. After: Be the cooperative support.

  9. A mobile field-work data collection system for the wireless era of health surveillance.

    PubMed

    Forsell, Marianne; Sjögren, Petteri; Renard, Matthew; Johansson, Olle

    2011-03-01

    In many countries or regions the capacity of health care resources is below the needs of the population and new approaches for health surveillance are needed. Innovative projects, utilizing wireless communication technology, contribute to reliable methods for field-work data collection and reporting to databases. The objective was to describe a new version of a wireless IT-support system for field-work data collection and administration. The system requirements were drawn from the design objective and translated to system functions. The system architecture was based on fieldwork experiences and administrative requirements. The Smartphone devices were HTC Touch Diamond2s, while the system was based on a platform with Microsoft .NET components, and a SQL Server 2005 with Microsoft Windows Server 2003 operating system. The user interfaces were based on .NET programming, and Microsoft Windows Mobile operating system. A synchronization module enabled download of field data to the database, via a General Packet Radio Services (GPRS) to a Local Area Network (LAN) interface. The field-workers considered the here-described applications user-friendly and almost self-instructing. The office administrators considered that the back-office interface facilitated retrieval of health reports and invoice distribution. The current IT-support system facilitates short lead times from fieldwork data registration to analysis, and is suitable for various applications. The advantages of wireless technology, and paper-free data administration need to be increasingly emphasized in development programs, in order to facilitate reliable and transparent use of limited resources.

  10. 5 CFR 470.313 - Project implementation regulations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Project implementation regulations. 470.313 Section 470.313 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to...

  11. 5 CFR 470.313 - Project implementation regulations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 1 2011-01-01 2011-01-01 false Project implementation regulations. 470.313 Section 470.313 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to...

  12. Wernher von Braun

    NASA Image and Video Library

    1960-01-01

    Dr. Wernher von Braun served as Marshall Space Flight Center's first director from July 1, 1960 until January 27, 1970, when he was appointed NASA Deputy Associate Administrator for Plarning. Following World War II, Dr. von Braun and his German colleagues arrived in the United States under Project Paperclip to continue their rocket development work. In 1950, von Braun and his rocket team were transferred from Ft. Bliss, Texas to Huntsville, Alabama to work for the Army's rocket program at Redstone Arsenal and later, NASA's Marshall Space Flight Center. Under von Braun's leadership, Marshall developed the Saturn V launch vehicle which took Apollo astronauts to the moon.

  13. The Labor Shortage--Poverty and Educational Aspects. Hearings on Examining Alternatives Available in Coping with a Projected Labor Shortage in the Future while Facing a Poverty Surplus and Educational Gaps in the Work Force before the Committee on Labor and Human Resources. United States Senate, One Hundred First Congress, First Session (January 26 and 27, 1989).

    ERIC Educational Resources Information Center

    Congress of the U.S., Washington, DC. Senate Committee on Labor and Human Resources.

    This document comprises hearings on the poverty and educational aspects of the labor shortage. Twenty witnesses testified, including Secretary of the U.S. Department of Labor Elizabeth Dole, Secretary of the U.S. Department of Education Lauro F. Cavazos, legislators, program administrators, and three working mothers. Testimony included the…

  14. Northwest Energy Efficient Manufactured Housing Program: High Performance Manufactured Home Prototyping and Construction Development

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hewes, Tom; Peeks, Brady

    2013-11-01

    The Building America Partnership for Improved Residential Construction, the Bonneville Power Administration (BPA), and Northwest Energy Works (NEW), the current Northwest Energy Efficient Manufactured Housing Program (NEEM) administrator, have been collaborating to conduct research on new specifications that would improve on the energy requirements of a NEEM home. In its role as administrator, NEW administers the technical specs, performs research and engineering analysis, implements ongoing construction quality management procedures, and maintains a central database with home tracking. This project prototyped and assessed the performances of cost-effective high performance building assemblies and mechanical systems that are not commonly deployed in themore » manufacturing setting. The package of measures is able to reduce energy used for space conditioning, water heating and lighting by 50 percent over typical manufactured homes produced in the northwest.« less

  15. Technology Solutions for New Manufactured Homes: Idaho, Oregon, and Washington Manufactured Home Builders (Fact Sheet)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    2013-11-01

    The Building America Partnership for Improved Residential Construction, the Bonneville Power Administration (BPA), and Northwest Energy Works (NEW), the current Northwest Energy Efficient Manufactured Housing Program (NEEM) administrator, have been collaborating to conduct research on new specifications that would improve on the energy requirements of a NEEM home. In its role as administrator, NEW administers the technical specs, performs research and engineering analysis, implements ongoing construction quality management procedures, and maintains a central database with home tracking. This project prototyped and assessed the performances of cost-effective high performance building assemblies and mechanical systems that are not commonly deployed in themore » manufacturing setting. The package of measures is able to reduce energy used for space conditioning, water heating and lighting by 50 percent over typical manufactured homes produced in the northwest.« less

  16. Northwest Energy Efficient Manufactured Housing Program: High Performance Manufactured Home Prototyping and Construction Development

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hewes, Tom; Peeks, Brady

    2013-11-01

    The Building America Partnership for Improved Residential Construction, the Bonneville Power Administration (BPA), and Northwest Energy Works (NEW), the current Northwest Energy Efficient Manufactured Housing Program (NEEM) administrator, have been collaborating to conduct research on new specifications that would improve on the energy requirements of a NEEM home. In its role as administrator, NEW administers the technical specs, performs research and engineering analysis, implements ongoing construction quality management procedures, and maintains a central database with home tracking. This project prototyped and assessed the performances of cost-effective high performance building assemblies and mechanical systems that are not commonly deployed in themore » manufacturing setting. The package of measures is able to reduce energy used for space conditioning, water heating and lighting by 50% over typical manufactured homes produced in the northwest.« less

  17. KSC History Project

    NASA Technical Reports Server (NTRS)

    Moore, Patrick K.

    2003-01-01

    The 2003 NASA/ASEE KSC History Project focused on a series of six history initiatives designed to acquire, preserve, and interpret the history of Kennedy Space Center. These six projects included the completion of Voices From the Cape, historical work co-authored with NASA historian Roger Launius, the completion of a series of oral histories with key KSC personnel, expansion of monograph on Public Affairs into two comprehensive pieces on KSC press operations and KSC visitor operations, the expansion of KSC Historical Concept Maps (Cmap) for history knowledge preservation, the expansion of the KSC oral history program through the administration of an oral history workshop for KSC-based practitioners, and the continued collaborative relationships between Kennedy Space Center, the University of West Florida, the University of Central Florida and other institutions including the University of Louisiana at Lafayette.

  18. 5 CFR 470.315 - Project modification and extension.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Project modification and extension. 470.315 Section 470.315 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to...

  19. Implementing an Open Source Electronic Health Record System in Kenyan Health Care Facilities: Case Study

    PubMed Central

    Magare, Steve; Monda, Jonathan; Kamau, Onesmus; Houston, Stuart; Fraser, Hamish; Powell, John; English, Mike; Paton, Chris

    2018-01-01

    Background The Kenyan government, working with international partners and local organizations, has developed an eHealth strategy, specified standards, and guidelines for electronic health record adoption in public hospitals and implemented two major health information technology projects: District Health Information Software Version 2, for collating national health care indicators and a rollout of the KenyaEMR and International Quality Care Health Management Information Systems, for managing 600 HIV clinics across the country. Following these projects, a modified version of the Open Medical Record System electronic health record was specified and developed to fulfill the clinical and administrative requirements of health care facilities operated by devolved counties in Kenya and to automate the process of collating health care indicators and entering them into the District Health Information Software Version 2 system. Objective We aimed to present a descriptive case study of the implementation of an open source electronic health record system in public health care facilities in Kenya. Methods We conducted a landscape review of existing literature concerning eHealth policies and electronic health record development in Kenya. Following initial discussions with the Ministry of Health, the World Health Organization, and implementing partners, we conducted a series of visits to implementing sites to conduct semistructured individual interviews and group discussions with stakeholders to produce a historical case study of the implementation. Results This case study describes how consultants based in Kenya, working with developers in India and project stakeholders, implemented the new system into several public hospitals in a county in rural Kenya. The implementation process included upgrading the hospital information technology infrastructure, training users, and attempting to garner administrative and clinical buy-in for adoption of the system. The initial deployment was ultimately scaled back due to a complex mix of sociotechnical and administrative issues. Learning from these early challenges, the system is now being redesigned and prepared for deployment in 6 new counties across Kenya. Conclusions Implementing electronic health record systems is a challenging process in high-income settings. In low-income settings, such as Kenya, open source software may offer some respite from the high costs of software licensing, but the familiar challenges of clinical and administration buy-in, the need to adequately train users, and the need for the provision of ongoing technical support are common across the North-South divide. Strategies such as creating local support teams, using local development resources, ensuring end user buy-in, and rolling out in smaller facilities before larger hospitals are being incorporated into the project. These are positive developments to help maintain momentum as the project continues. Further integration with existing open source communities could help ongoing development and implementations of the project. We hope this case study will provide some lessons and guidance for other challenging implementations of electronic health record systems as they continue across Africa. PMID:29669709

  20. Mexican Space Agency and NASA Agreement

    NASA Image and Video Library

    2013-03-18

    Leland Melvin (right), NASA Associate Administrator for Education, along with the head of the Mexican Space Agency, Dr. Francisco Javier Mendieta Jimenez shake hands after signing a Reimbursable Space Act Agreement (RSAA) for a NASA International Internship Program as NASA Administrator Charles Bolden looks on, Monday, March 18, 2013 at NASA Headquarters in Washington. The International Internship Program is a pilot program developed at NASA which will provide and avenue for non-US students to come to NASA for an internship. US students will be paired with a foreign student to work on a NASA research project under the guidance of a mentor. This is the first NASA-Mexico agreement signed. Photo Credit: (NASA/Carla Cioffi)

  1. Mexican Space Agency and NASA Agreement

    NASA Image and Video Library

    2013-03-18

    NASA Administrator Charles Bolden (center) presents Dr. Francisco Javier Mendieta Jimenez, Director General of the Mexican Space Agency, a NASA montage in honor of the Reimbursable Space Act Agreement (RSAA) signed between the two agencies, Monday, March 18, 2013 at NASA Headquarters in Washington. Leland Melvin (right), NASA Associate Administrator for Education looks on. The International Internship Program is a pilot program developed at NASA which will provide and avenue for non-US students to come to NASA for an internship. US students will be paired with a foreign student to work on a NASA research project under the guidance of a mentor. This is the first NASA-Mexico agreement signed. Photo Credit: (NASA/Carla Cioffi)

  2. Mexican Space Agency and NASA Agreement

    NASA Image and Video Library

    2013-03-18

    Leland Melvin (right), NASA Associate Administrator for Education, along with the head of the Mexican Space Agency, Dr. Francisco Javier Mendieta Jimenez pose for a photo after signing a Reimbursable Space Act Agreement (RSAA) for a NASA International Internship Program as NASA Administrator Charles Bolden looks on, Monday, March 18, 2013 at NASA Headquarters in Washington. The International Internship Program is a pilot program developed at NASA which will provide and avenue for non-US students to come to NASA for an internship. US students will be paired with a foreign student to work on a NASA research project under the guidance of a mentor. This is the first NASA-Mexico agreement signed. Photo Credit: (NASA/Carla Cioffi)

  3. Organizational Cultural Theory and Research Administration Knowledge Management

    ERIC Educational Resources Information Center

    Lehman, Dwayne W.

    2017-01-01

    The administration and management of sponsored projects spans many levels within an institution of higher education. Research administration professionals require an operational understanding of a complex and intertwined set of disciplines that include project management, finance, legal, ethics, communication, and business acumen. The explicit…

  4. 78 FR 35022 - Parker-Davis Project-Rate Order No. WAPA-162

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-11

    ... DEPARTMENT OF ENERGY Western Area Power Administration Parker-Davis Project-Rate Order No. WAPA-162 AGENCY: Western Area Power Administration, DOE. ACTION: Notice of Proposed Extension of Firm Electric and Transmission Service Formula Rates. SUMMARY: The Western Area Power Administration (Western...

  5. Project management for complex ground-based instruments: MEGARA plan

    NASA Astrophysics Data System (ADS)

    García-Vargas, María. Luisa; Pérez-Calpena, Ana; Gil de Paz, Armando; Gallego, Jesús; Carrasco, Esperanza; Cedazo, Raquel; Iglesias, Jorge

    2014-08-01

    The project management of complex instruments for ground-based large telescopes is a challenge itself. A good management is a clue for project success in terms of performance, schedule and budget. Being on time has become a strict requirement for two reasons: to assure the arrival at the telescope due to the pressure on demanding new instrumentation for this first world-class telescopes and to not fall in over-costs. The budget and cash-flow is not always the expected one and has to be properly handled from different administrative departments at the funding centers worldwide distributed. The complexity of the organizations, the technological and scientific return to the Consortium partners and the participation in the project of all kind of professional centers working in astronomical instrumentation: universities, research centers, small and large private companies, workshops and providers, etc. make the project management strategy, and the tools and procedures tuned to the project needs, crucial for success. MEGARA (Multi-Espectrógrafo en GTC de Alta Resolución para Astronomía) is a facility instrument of the 10.4m GTC (La Palma, Spain) working at optical wavelengths that provides both Integral-Field Unit (IFU) and Multi-Object Spectrograph (MOS) capabilities at resolutions in the range R=6,000-20,000. The project is an initiative led by Universidad Complutense de Madrid (Spain) in collaboration with INAOE (Mexico), IAA-CSIC (Spain) and Universidad Politécnica de Madrid (Spain). MEGARA is being developed under contract with GRANTECAN.

  6. 5 CFR 470.305 - Submission of proposals for demonstration projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 1 2011-01-01 2011-01-01 false Submission of proposals for demonstration projects. 470.305 Section 470.305 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements...

  7. 36 CFR 218.3 - Authorized hazardous fuel reduction projects subject to objection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE PREDECISIONAL ADMINISTRATIVE REVIEW PROCESSES Predecisional Administrative Review Process for Hazardous Fuel Reduction Projects Authorized by the Healthy Forests Restoration..., the objection process of this part applies to both the plan amendment and the project. ...

  8. Overview of the Nasa/science Mission Directorate University Student Instrument Project (usip)

    NASA Astrophysics Data System (ADS)

    Pierce, D. L.

    2016-12-01

    These are incredible times of space and Earth science discovery related to the Earth system, our Sun, the planets, and the universe. The National Aeronautics and Space Administration (NASA) Science Mission Directorate (SMD) provides authentic student-led hands-on flight research projects as a component part of the NASA's science program. The goal of the Undergraduate Student Instrument Project (USIP) is to enable student-led scientific and technology investigations, while also providing crucial hands-on training opportunities for the Nation's future researchers. SMD, working with NASA's Office of Education (OE), the Space Technology Mission Directorate (STMD) and its Centers (GSFC/WFF and AFRC), is actively advancing the vision for student flight research using NASA's suborbital and small spacecraft platforms. Recently proposed and selected USIP projects will open up opportunities for undergraduate researchers in conducting science and developing space technologies. The paper will present an overview of USIP, results of USIP-I, and the status of current USIP-II projects that NASA is sponsoring and expects to fly in the near future.

  9. A Descriptive Study of Body Pain and Work-Related Musculoskeletal Disorders Among Latino Farmworkers Working on Sweet Potato Farms in Eastern North Carolina.

    PubMed

    Kearney, Gregory D; Allen, Daniel L; Balanay, Jo Anne G; Barry, Paul

    2016-01-01

    Agricultural work is a physically demanding occupation. The purpose of this project was to describe the prevalence of work-related musculoskeletal disorders (WMSDs) and self-reported pain among Latino farmworkers who work extensively hand harvesting sweet potatoes. Data were obtained from a cross-sectional survey of farmworkers (N = 120) in eastern North Carolina. Univariate and bivariate analyses were used to describe personal, work characteristics, and self-reported pain associated with musculoskeletal injuries. Overall, 79% of farmworkers reported any type of pain or discomfort. The highest reported areas of pain were in the back (66%) and shoulder areas (31%). Younger participants experienced more shoulder pain (P = .04) than older workers, and working more than 5 years as a farmworker was significantly associated with back pain (P = .01). Interventions aimed at administrative and engineering controls for reducing risk factors that contribute to WMSDs are warranted.

  10. Science-Driven Candidate Search for New Scintillator Materials: FY 2014 Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kerisit, Sebastien N.; Gao, Fei; Xie, YuLong

    2014-10-01

    This annual reports presents work carried out during Fiscal Year (FY) 2014 at Pacific Northwest National Laboratory (PNNL) under the project entitled “Science-Driven Candidate Search for New Scintillator Materials” (Project number: PL13-SciDriScintMat-PD05) and led by Drs. Fei Gao and Sebastien N. Kerisit. This project is divided into three tasks: 1) Ab initio calculations of electronic properties, electronic response functions and secondary particle spectra; 2) Intrinsic response properties, theoretical light yield, and microscopic description of ionization tracks; and 3) Kinetics and efficiency of scintillation: nonproportionality, intrinsic energy resolution, and pulse shape discrimination. Detailed information on the results obtained in each ofmore » the three tasks is provided in this Annual Report. Furthermore, peer-reviewed articles published this FY or currently under review and presentations given this FY are included in Appendix. This work was supported by the National Nuclear Security Administration, Office of Nuclear Nonproliferation Research and Development (DNN R&D/NA-22), of the U.S. Department of Energy (DOE).« less

  11. Materials and Process Activities for NASA's Composite Crew Module

    NASA Technical Reports Server (NTRS)

    Polis, Daniel L.

    2012-01-01

    In January 2007, the NASA Administrator and Associate Administrator for the Exploration Systems Mission Directorate chartered the NASA Engineering and Safety Center (NESC) to design, build, and test a full-scale Composite Crew Module (CCM). The overall goal of the CCM project was to develop a team from the NASA family with hands-on experience in composite design, manufacturing, and testing in anticipation of future space exploration systems being made of composite materials. The CCM project was planned to run concurrently with the Orion project s baseline metallic design within the Constellation Program so that features could be compared and discussed without inducing risk to the overall Program. The materials and process activities were prioritized based on a rapid prototype approach. This approach focused developmental activities on design details with greater risk and uncertainty, such as out-of-autoclave joining, over some of the more traditional lamina and laminate building block levels. While process development and associated building block testing were performed, several anomalies were still observed at the full-scale level due to interactions between process robustness and manufacturing scale-up. This paper describes the process anomalies that were encountered during the CCM development and the subsequent root cause investigations that led to the final design solutions. These investigations highlight the importance of full-scale developmental work early in the schedule of a complex composite design/build project.

  12. FY 2011 United States Army Corps of Engineers Annual Financial Report. America’s Army: At a Strategic Crossroads.

    DTIC Science & Technology

    2011-01-01

    Management Agency, the Department of Housing and Urban Development, the National Oceanic and Atmospheric Administration, aff ected state agencies...history, the United States has relied on the Civil Works program for help in times of national disaster. Emergency management continues to be an...agencies) and demonstrate the fact that project management , operations, and maintenance activities are performed at the local (district) level . Th e

  13. US Strike Command Cold War Study Summary

    DTIC Science & Technology

    1965-07-08

    Group Summary Report 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK...often difficult to achieve in underdeveloped areas where divided loyalties and inept administration foster special interests and divergent efforts...roads where they a re easy targets for ambushes and where they are relatively ineffectiv e against insurgent forces. The experiences of the French

  14. Evaluating and Mitigating Software Supply Chain Security Risks

    DTIC Science & Technology

    2010-05-01

    is returned for all employees. The risk associated with this defect is high; variants of it have been used in attacks that caused credit card data to...via Common Access Card (CAC) readers). 29 | CMU/SEI-2010-TN-016 4.2.1 Supplier Capability Because the project is already in development, the...ClearCase, Windows, Linux and Solaris, network administration, TCP/IP, X/Motif, DII COE, Simple Net- work Management Protocol (SNMP), Agent Technology

  15. Mapping the literature of nursing administration.

    PubMed

    Galganski, Carol J

    2006-04-01

    As part of Phase I of a project to map the literature of nursing, sponsored by the Nursing and Allied Health Resources Section of the Medical Library Association, this study identifies the core literature cited in nursing administration and the indexing services that provide access to the core journals. The results of this study will assist librarians and end users searching for information related to this nursing discipline, as well as database producers who might consider adding specific titles to their indexing services. Using the common methodology described in the overview article, five source journals for nursing administration were identified and selected for citation analysis over a three-year period, 1996 to 1998, to identify the most frequently cited titles according to Bradford's Law of Scattering. From this core of most productive journal titles, the bibliographic databases that provide the best access to these titles were identified. Results reveal that nursing administration literature relies most heavily on journal articles and on those titles identified as core nursing administrative titles. When the indexing coverage of nine services is compared, PubMed/MEDLINE and CINAHL provide the most comprehensive coverage of this nursing discipline. No one indexing service adequately covers this nursing discipline. Researchers needing comprehensive coverage in this area must search more than one database to effectively research their projects. While PubMed/MEDLINE and CINAHL provide more coverage for this discipline than the other indexing services, none is sufficiently broad in scope to provide indexing of nursing, health care management, and medical literature in a single file. Nurse administrators using the literature to research current work issues need to review not only the nursing titles covered by CINAHL but should also include the major weekly medical titles, core titles in health care administration, and general business sources if they wish to adequately cover the many aspects of nursing administration.

  16. 40 CFR 149.109 - Decision under section 1424(e).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... information as is available to him, the Regional Administrator shall review the project taking all relevant... secondary impacts of the proposed project; and (5) The expected environmental benefits of the proposed project. (b) After reviewing the available information, the Regional Administrator shall: (1) Determine...

  17. 40 CFR 149.109 - Decision under section 1424(e).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... information as is available to him, the Regional Administrator shall review the project taking all relevant... secondary impacts of the proposed project; and (5) The expected environmental benefits of the proposed project. (b) After reviewing the available information, the Regional Administrator shall: (1) Determine...

  18. Migrant Education Administrative Handbook.

    ERIC Educational Resources Information Center

    Louisiana State Dept. of Education, Baton Rouge. Bureau of Migrant Education.

    Intended to provide information pertaining to the administration of migrant education projects in Louisiana, the handbook is divided into two sections: basic guidelines for program operations and support services--nursing. Section I covers the Federal and State migrant program, local migrant projects, project personnel and staff development, and…

  19. Marky: a tool supporting annotation consistency in multi-user and iterative document annotation projects.

    PubMed

    Pérez-Pérez, Martín; Glez-Peña, Daniel; Fdez-Riverola, Florentino; Lourenço, Anália

    2015-02-01

    Document annotation is a key task in the development of Text Mining methods and applications. High quality annotated corpora are invaluable, but their preparation requires a considerable amount of resources and time. Although the existing annotation tools offer good user interaction interfaces to domain experts, project management and quality control abilities are still limited. Therefore, the current work introduces Marky, a new Web-based document annotation tool equipped to manage multi-user and iterative projects, and to evaluate annotation quality throughout the project life cycle. At the core, Marky is a Web application based on the open source CakePHP framework. User interface relies on HTML5 and CSS3 technologies. Rangy library assists in browser-independent implementation of common DOM range and selection tasks, and Ajax and JQuery technologies are used to enhance user-system interaction. Marky grants solid management of inter- and intra-annotator work. Most notably, its annotation tracking system supports systematic and on-demand agreement analysis and annotation amendment. Each annotator may work over documents as usual, but all the annotations made are saved by the tracking system and may be further compared. So, the project administrator is able to evaluate annotation consistency among annotators and across rounds of annotation, while annotators are able to reject or amend subsets of annotations made in previous rounds. As a side effect, the tracking system minimises resource and time consumption. Marky is a novel environment for managing multi-user and iterative document annotation projects. Compared to other tools, Marky offers a similar visually intuitive annotation experience while providing unique means to minimise annotation effort and enforce annotation quality, and therefore corpus consistency. Marky is freely available for non-commercial use at http://sing.ei.uvigo.es/marky. Copyright © 2014 Elsevier Ireland Ltd. All rights reserved.

  20. Ford and Edison in a modern regulatory environment: the first-in-human trial of night-work and artificial light.

    PubMed

    Erren, Thomas C; Shaw, David M; Wild, Ursula; Groß, J Valérie

    2017-01-01

    A thought experiment places Henry Ford and Thomas Alva Edison in a modern regulatory environment. In a utopian occupational world devoid of night-shifts or artificial light, Ford wants to experiment with "working through the night". To support Ford's project, Edison offers his patented electric lamps to "turn nights into days". An ethics committee [EC] does not approve the night-work experiment and Utopia's Food and Drug Administration [FDA] does not approve the potential medical device as safe for use by humans. According to the EC and FDA, complex effects on circadian biology and thus safety of work and light at night are not understood. The thought experiment conveys that we should pay more attention to possible risks of work and light at chronobiologically unusual times.

  1. 75 FR 10806 - Training Program for Regulatory Project Managers; Information Available to Industry

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-09

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2010-N-0108] Training Program for Regulatory Project Managers; Information Available to Industry AGENCY: Food and Drug Administration, HHS. ACTION: Notice. SUMMARY: The Food and Drug Administration (FDA) Center for Drug Evaluation...

  2. 78 FR 8544 - Training Program for Regulatory Project Managers; Information Available to Industry

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-06

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2003-N-0453] Training Program for Regulatory Project Managers; Information Available to Industry AGENCY: Food and Drug Administration, HHS. ACTION: Notice. SUMMARY: The Food and Drug Administration's (FDA's) Center for Drug...

  3. 14 CFR 158.83 - Informal resolution.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... PASSENGER FACILITY CHARGES (PFC'S) Termination § 158.83 Informal resolution. The Administrator shall... § 158.71, the Administrator cannot determine that PFC revenue is being used for the approved projects in accordance with the terms of the Administrator's approval to impose a PFC for those projects or with 49 U.S.C...

  4. 14 CFR 158.83 - Informal resolution.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... PASSENGER FACILITY CHARGES (PFC'S) Termination § 158.83 Informal resolution. The Administrator shall... § 158.71, the Administrator cannot determine that PFC revenue is being used for the approved projects in accordance with the terms of the Administrator's approval to impose a PFC for those projects or with 49 U.S.C...

  5. 14 CFR 158.83 - Informal resolution.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... PASSENGER FACILITY CHARGES (PFC'S) Termination § 158.83 Informal resolution. The Administrator shall... § 158.71, the Administrator cannot determine that PFC revenue is being used for the approved projects in accordance with the terms of the Administrator's approval to impose a PFC for those projects or with 49 U.S.C...

  6. 14 CFR 158.83 - Informal resolution.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... PASSENGER FACILITY CHARGES (PFC'S) Termination § 158.83 Informal resolution. The Administrator shall... § 158.71, the Administrator cannot determine that PFC revenue is being used for the approved projects in accordance with the terms of the Administrator's approval to impose a PFC for those projects or with 49 U.S.C...

  7. 14 CFR 158.83 - Informal resolution.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... PASSENGER FACILITY CHARGES (PFC'S) Termination § 158.83 Informal resolution. The Administrator shall... § 158.71, the Administrator cannot determine that PFC revenue is being used for the approved projects in accordance with the terms of the Administrator's approval to impose a PFC for those projects or with 49 U.S.C...

  8. 23 CFR 660.515 - Project administration.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... PROGRAMS (DIRECT FEDERAL) Defense Access Roads § 660.515 Project administration. (a) Determination of the... or local highway agency. (b) Defense access road projects under the supervision of a State or local... commitment from the State or local highway agency, within whose jurisdiction the access road lies, that it...

  9. 76 FR 78332 - Amended Notice of Limitation on Claims Against Proposed Public Transportation Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-16

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Amended Notice of Limitation on Claims Against Proposed Public Transportation Project AGENCY: Federal Transit Administration (FTA), DOT. ACTION... actions announced herein for the listed public transportation project will be barred unless the claim is...

  10. 76 FR 55470 - Notice of Limitation on Claims Against Proposed Public Transportation Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-07

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Notice of Limitation on Claims Against Proposed Public Transportation Project AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... announced herein for the listed public transportation project will be barred unless the claim is filed on or...

  11. 76 FR 4150 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-24

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Notice of Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... public transportation project will be barred unless the claim is filed on or before July 25, 2011. FOR...

  12. 75 FR 27550 - Electrical Interconnection of the Juniper Canyon I Wind Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-17

    ... Canyon I Wind Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of Availability of Record of Decision (ROD). SUMMARY: The Bonneville Power Administration (BPA... County, Washington. To interconnect the Wind Project, BPA will expand an existing substation (Rock Creek...

  13. Hood River Fish Habitat Project; Confederated Tribes of the Warm Springs Reservation of Oregon, Annual Report 2001-2002.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vaivoda, Alexis

    2003-11-01

    This report summarizes the project implementation and monitoring of all habitat activities that occurred over Fiscal Year 2002 (FY 02). Some of the objectives in the corresponding statement of work for this contract were not completed within FY 02. A description of the progress during FY 02 and reasoning for deviation from the original tasks and timeline are given. OBJECTIVE 1--Provide coordination of all activities, administrative oversight and assist in project implementation and monitoring activities. Administration oversight and coordination of the habitat statement of work, budget, subcontracts and personnel was provided. OBJECTIVE 2--Develop, coordinate, and implement the Hood River Fishmore » Habitat Protection, Restoration, and Monitoring Plan. The Hood River Fish Habitat Protection, Restoration, and Monitoring Plan was completed in 2000 (Coccoli et al., 2000). This document is utilized for many purposes including: drafting the Watershed Action Plan, ranking projects for funding, and prioritizing projects to target in the future. This document was updated and revised to reflect changes to fish habitat and needs in the Hood River basin based upon other documents and actions taken in the basin. OBJECTIVE 3--Assist Middle Fork Irrigation District in developing an alternative irrigation water source on Evans Creek (Hutson pond and Evans Creek diversion), eliminating the need for irrigation diversion dams which happen to be partial fish barriers. Upon completion, this project will restore 2.5 miles of access for winter steelhead, coho salmon, and resident trout habitat. This objective was revised and included in the FY 03 Statement of Work for Project No. 1998-021-00. During FY 02 the final engineering was completed on this project. However, due to a lengthy permitting process and NMFS consultation, this project was inadvertently delayed. Project completion is expected in July 2003. OBJECTIVE 4--Assist the Farmers Irrigation District (FID) in construction and installation of a new fish screen and bypass system on the mainstem Hood River (Farmers Canal). Final engineering and design for the horizontal screen was completed during the winter of 2001. In December 2001 and January 2002, the concrete work was completed and the head gates were mounted. During the spring the secondary head level control gates were installed. In September 2002, the jersey barriers and vortex tubes were installed. These are located upstream of the old drum screen, and are the primary means of dealing with bedload and suspended load from the diversion. The screen surface was also installed in September 2002 and the system accommodated water soon after. Monitoring of these structures in regards to efficiency and possible effects to fish migration is scheduled to occur in spring 2003. The transition from the old canal to the new screen is smooth and currently does not present any problems. The old drum screen is going to remain in place until all the biological and hydrological monitoring is complete to ensure compliance and satisfaction of all agencies involved. OBJECTIVE 5--Assist the East Fork Irrigation District (EFID) in final engineering design and construction of the Central Lateral Canal upgrade and invert siphon. This objective was revised and included in the FY 03 Statement of Work for Project No. 1998-021-00. During FY 02, a significant portion of the engineering and design work was completed on the EFID Central Lateral Canal upgrade and invert siphon. There were some changes in canal alignment that required further design work and easement acquisition. Time was also spent looking for matching funds and securing a loan by the EFID. Construction initiation is now scheduled for summer 2003. OBJECTIVE 6--Modify and/or eliminate five culverts, three on Baldwin Creek, one on Graham Creek, and one on Evans Creek, which function as barriers to upstream and downstream fish migration. This objective was revised and included in the FY 03 Statement of Work for Project No. 1998-021-00. There are only two culverts on Baldwin Creek that will be eliminated or modified. Work was initiated on the removal of one of these culverts, and the replacement of the other. The landowner was agreeable and NEPA was initiated. The modification/elimination of these culverts is scheduled for FY 04. The culvert on Graham Creek is a county road, and will be addressed as a fish passage barrier by Hood River County. The Evans Creek culvert was prepared for modification in FY 02, however due to a lengthy permitting process the instream work period was missed. This project is on the schedule for the instream work period of 2003. OBJECTIVE 7--Construct riparian fence to stabilize and improve the riparian zone along the East Fork Hood River and tributaries. Two riparian fencing projects were completed on East Fork Hood River tributaries. The first was on Baldwin Creek, and the second was on Shelly Creek.« less

  14. 36 CFR 218.12 - Timing of authorized hazardous fuel reduction project decision.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE PREDECISIONAL ADMINISTRATIVE REVIEW PROCESSES Predecisional Administrative Review Process for Hazardous Fuel Reduction Projects Authorized by the Healthy Forests Restoration...

  15. System Administrator for LCS Development Sets

    NASA Technical Reports Server (NTRS)

    Garcia, Aaron

    2013-01-01

    The Spaceport Command and Control System Project is creating a Checkout and Control System that will eventually launch the next generation of vehicles from Kennedy Space Center. KSC has a large set of Development and Operational equipment already deployed in several facilities, including the Launch Control Center, which requires support. The position of System Administrator will complete tasks across multiple platforms (Linux/Windows), many of them virtual. The Hardware Branch of the Control and Data Systems Division at the Kennedy Space Center uses system administrators for a variety of tasks. The position of system administrator comes with many responsibilities which include maintaining computer systems, repair or set up hardware, install software, create backups and recover drive images are a sample of jobs which one must complete. Other duties may include working with clients in person or over the phone and resolving their computer system needs. Training is a major part of learning how an organization functions and operates. Taking that into consideration, NASA is no exception. Training on how to better protect the NASA computer infrastructure will be a topic to learn, followed by NASA work polices. Attending meetings and discussing progress will be expected. A system administrator will have an account with root access. Root access gives a user full access to a computer system and or network. System admins can remove critical system files and recover files using a tape backup. Problem solving will be an important skill to develop in order to complete the many tasks.

  16. New Whole-House Solutions Case Study: Technology Solutions for New Manufactured Homes, Idaho, Oregon, and Washington

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BA-PIRC

    2013-11-01

    The Building America Partnership for Improved Residential Construction, the Bonneville Power Administration (BPA), and Northwest Energy Works (NEW), the current Northwest Energy Efficient Manufactured Housing Program (NEEM) administrator, have been collaborating to conduct research on new specifications that would improve on the energy requirements of a NEEM home. In its role as administrator, NEW administers the technical specs, performs research and engineering analysis, implements ongoing construction quality management procedures, and maintains a central database with home tracking. This project prototyped and assessed the performances of cost-effective high performance building assemblies and mechanical systems that are not commonly deployed in themore » manufacturing setting. The package of measures is able to reduce energy used for space conditioning, water heating and lighting by 50 percent over typical manufactured homes produced in the northwest.« less

  17. Hypergol Maintenance Facility Hazardous Waste South Staging Areas, SWMU 070 Corrective Measures Implementation

    NASA Technical Reports Server (NTRS)

    Miller, Ralinda R.

    2016-01-01

    This document presents the Corrective Measures Implementation (CMI) Year 10 Annual Report for implementation of corrective measures at the Hypergol Maintenance Facility (HMF) Hazardous Waste South Staging Areas at Kennedy Space Center, Florida. The work is being performed by Tetra Tech, Inc., for the National Aeronautics and Space Administration (NASA) under Indefinite Delivery Indefinite Quantity (IDIQ) NNK12CA15B, Task Order (TO) 07. Mr. Harry Plaza, P.E., of NASA's Environmental Assurance Branch is the Remediation Project Manager for John F. Kennedy Space Center. The Tetra Tech Program Manager is Mr. Mark Speranza, P.E., and the Tetra Tech Project Manager is Robert Simcik, P.E.

  18. University of Texas Safeguards by Design Problem Statement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rauch, Eric Benton; Scherer, Carolynn P.; Ruggiero, Christy E.

    This document describes the problem statement that students at the University of Texas will use for their senior level capstone design class. The purpose of this project is to introduce students to Safeguards by Design concepts as part of their capstone design course at the culmination of their degree program. This work is supported by Los Alamos National Laboratory with FY17 and FY18 programmatic funding from the U. S. Department of Energy’s (DOE) National Nuclear Security Administration (NNSA), through the Office of Defense Nuclear Nonproliferation (DNN), Office of International Nuclear Safeguards (INS), Next Generation Safeguards Initiative (NGSI), Human Resource Developmentmore » Program, Safeguards by Design Project.« less

  19. Powering Exploration: The Ares I Crew Launch Vehicle and Ares V Cargo Launch Vehicle

    NASA Technical Reports Server (NTRS)

    Cook, Stephen A.

    2008-01-01

    The National Aeronautics and Space Administration (NASA)'s Constellation Program is depending on the Ares Projects to deliver the crew and cargo launch capabilities needed to send human explorers to the Moon and beyond. The Ares Projects continue to make progress toward design, component testing, and early flight testing of the Ares I crew launch vehicle, as well as early design work for Ares V cargo launch vehicle. Ares I and Ares V will form the core space launch capabilities the United States needs to continue its pioneering tradition as a spacefaring nation. This paper will discuss programmatic, design, fabrication, and testing progress toward building these new launch vehicles.

  20. 36 CFR 218.4 - Authorized hazardous fuel reduction projects not subject to objection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE PREDECISIONAL ADMINISTRATIVE REVIEW PROCESSES Predecisional Administrative Review Process for Hazardous Fuel Reduction Projects Authorized by the Healthy Forests Restoration...

  1. Kootenai River Wildlife Habitat Enhancement Project : Long-term Bighorn Sheep/Mule Deer Winter and Spring Habitat Improvement Project : Wildlife Mitigation Project, Libby Dam, Montana : Management Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yde, Chis

    1990-06-01

    The Libby hydroelectric project, located on the Kootenai River in northwestern Montana, resulted in several impacts to the wildlife communities which occupied the habitats inundated by Lake Koocanusa. Montana Department of Fish, Wildlife and Parks, in cooperation with the other management agencies, developed an impact assessment and a wildlife and wildlife habitat mitigation plan for the Libby hydroelectric facility. In response to the mitigation plan, Bonneville Power Administration funded a cooperative project between the Kootenai National Forest and Montana Department of Fish, Wildlife and Parks to develop a long-term habitat enhancement plan for the bighorn sheep and mule deer wintermore » and spring ranges adjacent to Lake Koocanusa. The project goal is to rehabilitate 3372 acres of bighorn sheep and 16,321 acres of mule deer winter and spring ranges on Kootenai National Forest lands adjacent to Lake Koocanusa and to monitor and evaluate the effects of implementing this habitat enhancement work. 2 refs.« less

  2. Empirical prediction intervals improve energy forecasting

    PubMed Central

    Kaack, Lynn H.; Apt, Jay; Morgan, M. Granger; McSharry, Patrick

    2017-01-01

    Hundreds of organizations and analysts use energy projections, such as those contained in the US Energy Information Administration (EIA)’s Annual Energy Outlook (AEO), for investment and policy decisions. Retrospective analyses of past AEO projections have shown that observed values can differ from the projection by several hundred percent, and thus a thorough treatment of uncertainty is essential. We evaluate the out-of-sample forecasting performance of several empirical density forecasting methods, using the continuous ranked probability score (CRPS). The analysis confirms that a Gaussian density, estimated on past forecasting errors, gives comparatively accurate uncertainty estimates over a variety of energy quantities in the AEO, in particular outperforming scenario projections provided in the AEO. We report probabilistic uncertainties for 18 core quantities of the AEO 2016 projections. Our work frames how to produce, evaluate, and rank probabilistic forecasts in this setting. We propose a log transformation of forecast errors for price projections and a modified nonparametric empirical density forecasting method. Our findings give guidance on how to evaluate and communicate uncertainty in future energy outlooks. PMID:28760997

  3. Reengineering the project design process

    NASA Astrophysics Data System (ADS)

    Kane Casani, E.; Metzger, Robert M.

    1995-01-01

    In response to the National Aeronautics and Space Administration's goal of working faster, better, and cheaper, the Jet Propulsion Laboratory (JPL) has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Development Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center (PDC) and the Flight System Testbed (FST). Reengineering at JPL implies a cultural change whereby the character of the Laboratory's design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and more accurate cost estimating. These improvements signal JPL's commitment to meeting the challenges of space exploration in the next century.

  4. 28 CFR 512.20 - Publication of results of research project.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Publication of results of research... MANAGEMENT AND ADMINISTRATION RESEARCH Research § 512.20 Publication of results of research project. (a) A researcher may publish in book form and professional journals the results of any research project conducted...

  5. 28 CFR 512.20 - Publication of results of research project.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Publication of results of research... MANAGEMENT AND ADMINISTRATION RESEARCH Research § 512.20 Publication of results of research project. (a) A researcher may publish in book form and professional journals the results of any research project conducted...

  6. 77 FR 55829 - Western Area Power Administration; Grapevine Canyon Wind Project Record of Decision (DOE/EIS-0427)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-11

    ... megawatts of electricity from wind turbine generators (WTGs). The proposed project includes a wind energy... about the installation of red flashing lights on wind turbine generators per Federal Aviation... DEPARTMENT OF ENERGY Western Area Power Administration; Grapevine Canyon Wind Project Record of...

  7. Evaluation of the School Administration Manager Project

    ERIC Educational Resources Information Center

    Turnbull, Brenda J.; Haslam, M. Bruce; Arcaira, Erikson R.; Riley, Derek L.; Sinclair, Beth; Coleman, Stephen

    2009-01-01

    The School Administration Manager (SAM) project, supported by The Wallace Foundation as part of its education initiative, focuses on changing the conditions in schools that prevent principals from devoting more time to instructional leadership. In schools participating in the National SAM Project, principals have made a commitment to increase the…

  8. Requirement Metrics for Risk Identification

    NASA Technical Reports Server (NTRS)

    Hammer, Theodore; Huffman, Lenore; Wilson, William; Rosenberg, Linda; Hyatt, Lawrence

    1996-01-01

    The Software Assurance Technology Center (SATC) is part of the Office of Mission Assurance of the Goddard Space Flight Center (GSFC). The SATC's mission is to assist National Aeronautics and Space Administration (NASA) projects to improve the quality of software which they acquire or develop. The SATC's efforts are currently focused on the development and use of metric methodologies and tools that identify and assess risks associated with software performance and scheduled delivery. This starts at the requirements phase, where the SATC, in conjunction with software projects at GSFC and other NASA centers is working to identify tools and metric methodologies to assist project managers in identifying and mitigating risks. This paper discusses requirement metrics currently being used at NASA in a collaborative effort between the SATC and the Quality Assurance Office at GSFC to utilize the information available through the application of requirements management tools.

  9. The Independent Technical Analysis Process Final Report 2006-2007.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Duberstein, Corey; Ham, Kenneth; Dauble, Dennis

    2007-03-01

    The Bonneville Power Administration (BPA) contracted with the Pacific Northwest National Laboratory (PNNL) to provide technical analytical support for system-wide fish passage information (BPA Project No. 2006-010-00). The goal of this project was to produce rigorous technical analysis products using independent analysts and anonymous peer reviewers. This project provided an independent technical source for non-routine fish passage analyses while allowing routine support functions to be performed by other well-qualified entities. The Independent Technical Analysis Process (ITAP) was created to provide non-routine analysis for fish and wildlife agencies and tribes in particular and the public in general on matters related tomore » juvenile and adult salmon and steelhead passage through the mainstem hydrosystem. The process was designed to maintain the independence of analysts and reviewers from parties requesting analyses, to avoid potential bias in technical products. The objectives identified for this project were to administer a rigorous, transparent process to deliver unbiased technical assistance necessary to coordinate recommendations for storage reservoir and river operations that avoid potential conflicts between anadromous and resident fish. Seven work elements, designated by numbered categories in the Pisces project tracking system, were created to define and accomplish project goals as follows: (1) 118 Coordination - Coordinate technical analysis and review process: (a) Retain expertise for analyst/reviewer roles. (b) Draft research directives. (c) Send directive to the analyst. (d) Coordinate two independent reviews of the draft report. (e) Ensure reviewer comments are addressed within the final report. (2) 162 Analyze/Interpret Data - Implement the independent aspects of the project. (3) 122 Provide Technical Review - Implement the review process for the analysts. (4) 132 Produce Annual Report - FY06 annual progress report with Pisces Disseminate (5) 161 Disseminate Raw/Summary Data and Results - Post technical products on the ITAP web site. (6) 185-Produce Pisces Status Report - Provide periodic status reports to BPA. (7) 119 Manage and Administer Projects - project/contract administration.« less

  10. Project TEAMS (Techniques and Education for Achieving Management Skills): Health Care Administrators.

    ERIC Educational Resources Information Center

    Platte Technical Community Coll., Columbus, NE.

    These Project TEAMS (Techniques and Education for Achieving Management Skills) instructional materials consist of five units for use in training health care administrators. Unit 1 contains materials designed to help the health care administrators increase their management skills in regard to self-awareness, time management, problem solving,…

  11. Integrating Bar-Code Medication Administration Competencies in the Curriculum: Implications for Nursing Education and Interprofessional Collaboration.

    PubMed

    Angel, Vini M; Friedman, Marvin H; Friedman, Andrea L

    This article describes an innovative project involving the integration of bar-code medication administration technology competencies in the nursing curriculum through interprofessional collaboration among nursing, pharmacy, and computer science disciplines. A description of the bar-code medication administration technology project and lessons learned are presented.

  12. Using simulation to design a central sterilization department.

    PubMed

    Lin, Feng; Lawley, Mark; Spry, Charlie; McCarthy, Kelly; Coyle-Rogers, Patricia G; Yih, Yuehwern

    2008-10-01

    A simulation project was performed to assist with redesign of the surgery department of a large tertiary hospital and to help administrators make the best decisions about relocating, staffing, and equipping the central sterilization department. A simulation model was created to analyze department configurations, staff schedules, equipment capacities, and cart-washing requirements. Performance measures examined include tray turnaround time, surgery-delay rate, and work-in-process levels. The analysis provides significant insight into how the proposed system will perform, allowing planning for expected patient volume increases. This work illustrates how simulation can facilitate the design of a central sterilization department and improve surgical sterilization operations.

  13. Environmental Criteria in the Spanish Public Works Procurement Process

    PubMed Central

    Fuentes-Bargues, José Luis; González-Cruz, Mª Carmen; González-Gaya, Cristina

    2017-01-01

    Green Public Procurement (GPP) is defined as a process of contracting products, services, and works with the least possible damage to the environment during their life cycle. In order to improve the knowledge about GPP, a study of the use of environmental tendering criteria in the Spanish public construction sector has been performed. The results of this study show that the use of environmental criteria in Spanish public sector construction procurement is low in comparison to a certain group of countries, known as “Green 7”, in the European Union. Environmental criteria is the fourth criterion in importance, but its weight in the global of the process is much lower than other criteria such as price, memory of the construction process and the delivery time. National administrations use environmental criteria more frequently because they have more resources and staff training about environmental issues. Environmental criteria are more used in the tendering of civil projects and works whose budget exceeds ten million euro due to the environmental impact of these kind and/or size of projects. PMID:28218706

  14. Agency Innovation Mission with Dava Newman

    NASA Image and Video Library

    2016-11-01

    Dr. Dava Newman, NASA's deputy administrator, speaks to employees at the Florida spaceport during the annual KickStart Innovation Expo. The event gives employees an opportunity to present proposals for new ideas and processes. A small amount of funding is awarded to those selected allowing individuals or teams to procure needed items to implement their projects. Kennedy employees are encouraged to look for ways to do their work better and to propose concepts for tackling future mission needs.

  15. Agency Innovation Mission with Dava Newman

    NASA Image and Video Library

    2016-11-01

    Dr. Dava Newman, NASA's deputy administrator, speaks to employees at the Florida spaceport during the annual KickStart Innovation Expo The event gives employees an opportunity to present proposals for new ideas and processes. A small amount of funding is awarded to those selected allowing individuals or teams to procure needed items to implement their projects. Kennedy employees are encouraged to look for ways to do their work better and to propose concepts for tackling future mission needs.

  16. An Analysis of U.S. Army Health Hazard Assessments During the Acquisition of Military Materiel

    DTIC Science & Technology

    2010-06-03

    GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S...administrative controls and the use of personal protective equipment (PPE) (Milz, Conrad, & Soule , 2003). Engineering controls can eliminate hazards through...facilitate hazard free designs or conditions (Milz, Conrad, & Soule , 2003). Engineering control measures can serve to 7 minimize hazards where they

  17. Innovative approaches to educating medical students for practice in a changing health care environment: the National UME-21 Project.

    PubMed

    Rabinowitz, H K; Babbott, D; Bastacky, S; Pascoe, J M; Patel, K K; Pye, K L; Rodak, J; Veit, K J; Wood, D L

    2001-06-01

    In today's continually changing health care environment, there is serious concern that medical students are not being adequately prepared to provide optimal health care in the system where they will eventually practice. To address this problem, the Health Resources and Services Administration (HRSA) developed a $7.6 million national demonstration project, Undergraduate Medical Education for the 21st Century (UME-21). This project funded 18 U.S. medical schools, both public and private, for a three-year period (1998-2001) to implement innovative educational strategies. To accomplish their goals, the 18 UME-21 schools worked with more than 50 organizations external to the medical school (e.g., managed care organizations, integrated health systems, Area Health Education Centers, community health centers). The authors describe the major curricular changes that have been implemented through the UME-21 project, discuss the challenges that occurred in carrying out those changes, and outline the strategies for evaluating the project. The participating schools have developed curricular changes that focus on the core primary care clinical clerkships, take place in ambulatory settings, include learning objectives and competencies identified as important to providing care in the future health care system, and have faculty development and internal evaluation components. Curricular changes implemented at the 18 schools include having students work directly with managed care organizations, as well as special demonstration projects to teach students the knowledge, skills, and attitudes necessary for successfully managing care. It is already clear that the UME-21 project has catalyzed important curricular changes within 12.5% of U.S. medical schools. The ongoing national evaluation of this project, which will be completed in 2002, will provide further information about the project's impact and effectiveness.

  18. Leo Commercial Market Projects (1997)

    DOT National Transportation Integrated Search

    1997-07-25

    The Federal Aviation Administration's Associate Administrator for Commercial : Space Transportation (AST) has prepared projections of the low Earth orbit : (LEO) commercial payload and launch markets for the period between 1997 and : 2006. This asses...

  19. Advice for Gaining Upper Administration Support for Research at an Undergraduate Institution

    NASA Astrophysics Data System (ADS)

    Isenhower, Donald

    2015-10-01

    This talk has its beginnings in questions asked after my invited talk for the 2015 APS Prize for Outstanding Research at an Undergraduate Institution at the April APS Meeting. A common question was how to gain support from one's university's administration to start an undergraduate research program. As my talk was addressing work done during 28 years at a university that had a long history of undergraduate research, I was not prepared to answer the question. It is easy to point out what one must do to obtain funding, even if actually obtaining the funding is difficult. Many other aspects of choosing appropriate research projects, collaborations, and such can also be relatively easy to do. Answers and advice in how to get upper level university administrators to notice and help you start a research program is not as easy or obvious, but is what this talk will address. It will be based on the premiss that one is at a university that is centered on providing high quality undergraduate education. Thus you have the job of showing your administration that having students working on a research program under you will help provide the highest level of education possible. Experience over many years of interactions at ACU will be drawn on for the advice provided. Research supported in part by Grants from the U.S. DOE Office of Science.

  20. Alerts Analysis and Visualization in Network-based Intrusion Detection Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yang, Dr. Li

    2010-08-01

    The alerts produced by network-based intrusion detection systems, e.g. Snort, can be difficult for network administrators to efficiently review and respond to due to the enormous number of alerts generated in a short time frame. This work describes how the visualization of raw IDS alert data assists network administrators in understanding the current state of a network and quickens the process of reviewing and responding to intrusion attempts. The project presented in this work consists of three primary components. The first component provides a visual mapping of the network topology that allows the end-user to easily browse clustered alerts. Themore » second component is based on the flocking behavior of birds such that birds tend to follow other birds with similar behaviors. This component allows the end-user to see the clustering process and provides an efficient means for reviewing alert data. The third component discovers and visualizes patterns of multistage attacks by profiling the attacker s behaviors.« less

  1. Analysis of administrative barriers in the industry of the high-rise construction in Russian Federation

    NASA Astrophysics Data System (ADS)

    Zaychenko, Irina; Borremans, Alexandra; Gutman, Svetlana

    2018-03-01

    The article describes the concept and types of administrative barriers encountered in various areas of the enterprise. The particularities of the Russian high-rise construction industry are described and a comparative analysis of administrative barriers in this sector is performed. The main stages and administrative procedures when the developers implement investment and construction projects in the field of high-rise construction are determined. The regulatory and legal framework for the implementation of investment and project activities in the high-rise construction industry has been studied and conclusions have been drawn on its low level of precision in the issue of the formation of competitive and efficient high-rise construction markets. The average number of administrative procedures for the implementation of the investment and construction project in the field of high-rise construction is determined. The factors preventing the reduction of administrative barriers in the high-rise construction industry are revealed.

  2. Geospatial Data for Computerisation of Public Administration in the Czech Republic

    NASA Astrophysics Data System (ADS)

    Cada, V.; Mildorf, T.

    2011-08-01

    The main aim of the eGovernment programme in the Czech Republic is to enhance the efficiency of public administration. The Digital Map of Public Administration (DMVS) should be composed of digital orthophotographs of the Czech Republic, digital and digitised cadastral maps, digital purpose cadastral map (ÚKM) and a technical map of municipality, if available. The DMVS project is a part of computerisation of public administration in the Czech Republic. The project enhances the productivity of government administration and also simplifies the processes between citizens and public administration. The DMVS project, that should be compliant with the INSPIRE (Infrastructure for Spatial Information in the European Community) initiative, generates definite demand for geodata on the level of detail of land data model. The user needs that are clearly specified and required are not met due to inconsistencies in terminology, data management and level of detail.

  3. The Walla Walla Basin Natural Production Monitoring and Evaluation Project : Progress Report, 1999-2002.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Contor, Craig R.; Sexton, Amy D.

    2003-06-02

    The Walla Walla Basin Natural Production Monitoring and Evaluation Project (WWNPME) was funded by Bonneville Power Administration (BPA) as directed by section 4(h) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P. L. 96-501). This project is in accordance with and pursuant to measures 4.2A, 4.3C.1, 7.1A.2, 7.1C.3, 7.1C.4 and 7.1D.2 of the Northwest Power Planning Council's (NPPC) Columbia River Basin Fish and Wildlife Program (NPPC 1994). Work was conducted by the Fisheries Program of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) under the Walla Walla Basin Natural Production Monitoring and Evaluation Project (WWNPME).more » Chapter One provides an overview of the entire report and how the objectives of each statement of work from 1999, 2000, 2001, and 2002 contract years are organized and reported. Chapter One also provides background information relevant to the aquatic resources of the Walla Walla River Basin. Objectives are outlined below for the statements of work for the 1999, 2000, 2001 and 2002 contract years. The same objectives were sometimes given different numbers in different years. Because this document is a synthesis of four years of reporting, we gave objectives letter designations and listed the objective number associated with the statement of work for each year. Some objectives were in all four work statements, while other objectives were in only one or two work statements. Each objective is discussed in a chapter. The chapter that reports activities and findings of each objective are listed with the objective below. Because data is often interrelated, aspects of some findings may be reported or discussed in more than one chapter. Specifics related to tasks, approaches, methods, results and discussion are addressed in the individual chapters.« less

  4. Implementing an Open Source Electronic Health Record System in Kenyan Health Care Facilities: Case Study.

    PubMed

    Muinga, Naomi; Magare, Steve; Monda, Jonathan; Kamau, Onesmus; Houston, Stuart; Fraser, Hamish; Powell, John; English, Mike; Paton, Chris

    2018-04-18

    The Kenyan government, working with international partners and local organizations, has developed an eHealth strategy, specified standards, and guidelines for electronic health record adoption in public hospitals and implemented two major health information technology projects: District Health Information Software Version 2, for collating national health care indicators and a rollout of the KenyaEMR and International Quality Care Health Management Information Systems, for managing 600 HIV clinics across the country. Following these projects, a modified version of the Open Medical Record System electronic health record was specified and developed to fulfill the clinical and administrative requirements of health care facilities operated by devolved counties in Kenya and to automate the process of collating health care indicators and entering them into the District Health Information Software Version 2 system. We aimed to present a descriptive case study of the implementation of an open source electronic health record system in public health care facilities in Kenya. We conducted a landscape review of existing literature concerning eHealth policies and electronic health record development in Kenya. Following initial discussions with the Ministry of Health, the World Health Organization, and implementing partners, we conducted a series of visits to implementing sites to conduct semistructured individual interviews and group discussions with stakeholders to produce a historical case study of the implementation. This case study describes how consultants based in Kenya, working with developers in India and project stakeholders, implemented the new system into several public hospitals in a county in rural Kenya. The implementation process included upgrading the hospital information technology infrastructure, training users, and attempting to garner administrative and clinical buy-in for adoption of the system. The initial deployment was ultimately scaled back due to a complex mix of sociotechnical and administrative issues. Learning from these early challenges, the system is now being redesigned and prepared for deployment in 6 new counties across Kenya. Implementing electronic health record systems is a challenging process in high-income settings. In low-income settings, such as Kenya, open source software may offer some respite from the high costs of software licensing, but the familiar challenges of clinical and administration buy-in, the need to adequately train users, and the need for the provision of ongoing technical support are common across the North-South divide. Strategies such as creating local support teams, using local development resources, ensuring end user buy-in, and rolling out in smaller facilities before larger hospitals are being incorporated into the project. These are positive developments to help maintain momentum as the project continues. Further integration with existing open source communities could help ongoing development and implementations of the project. We hope this case study will provide some lessons and guidance for other challenging implementations of electronic health record systems as they continue across Africa. ©Naomi Muinga, Steve Magare, Jonathan Monda, Onesmus Kamau, Stuart Houston, Hamish Fraser, John Powell, Mike English, Chris Paton. Originally published in JMIR Medical Informatics (http://medinform.jmir.org), 18.04.2018.

  5. Leo Commercial Market Projections (1996)

    DOT National Transportation Integrated Search

    1996-04-05

    The Office of the Associate Administrator for Commercial Space Transportation OCST) of the Federal Aviation Administration (FAA) has prepared the attached projections of the Low Earth Orbit (LEO) commercial payload and launch markets for the period b...

  6. Golden Gate Brokered Carpool: Report on Three Projects

    DOT National Transportation Integrated Search

    1985-10-01

    n 1981, the Golden Gate Bridge, Highway and Transportation District (GGBHTD) received a National Ridesharing Demonstration Project grant from the Federal Highway Administration (FHWA) and the Urban Mass Transportation Administration to support the Di...

  7. GREMEX- GODDARD RESEARCH AND ENGINEERING MANAGEMENT EXERCISE SIMULATION SYSTEM

    NASA Technical Reports Server (NTRS)

    Vaccaro, M. J.

    1994-01-01

    GREMEX is a man-machine management simulation game of a research and development project. It can be used to depict a project from just after the development of the project plan through the final construction phase. The GREMEX computer programs are basically a program evaluation and review technique (PERT) reporting system. In the usual PERT program, the operator inputs each month the amount of work performed on each activity and the computer does the bookkeeping to determine the expected completion date of the project. GREMEX automatically assumes that all activities due to be worked in the current month will be worked. GREMEX predicts new durations (and costs) each month based on management actions taken by the players and the contractor's abilities. Each activity is assigned the usual cost and duration estimates but must also be assigned three parameters that relate to the probability that the time estimate is correct, the probability that the cost estimate is correct, and the probability of technical success. Management actions usually can be expected to change these probabilities. For example, use of overtime or double shifts in research and development work will decrease duration and increase cost by known proportions and will also decrease the probability of technical success due to an increase in the likelihood of accidents or mistakes. These re-estimating future events and assigning probability factors provides life to the model. GREMEX is not a production job for project management. GREMEX is a game that can be used to train management personnel in the administration of research and development type projects. GREMEX poses no 'best way' to manage a project. The emphasis of GREMEX is to expose participants to many of the factors involved in decision making when managing a project in a government research and development environment. A management team can win the game by surpassing cost, schedule, and technical performance goals established when the simulation began. The serious management experimenter can use GREMEX to explore the results of management methods they could not risk in real life. GREMEX can operate with any research and development type project with up to 15 subcontractors and produces reports simulating monthly or quarterly updates of the project PERT network. Included with the program is a data deck for simulation of a fictitious spacecraft project. Instructions for substituting other projects are also included. GREMEX is written in FORTRAN IV for execution in the batch mode and has been implemented on an IBM 360 with a central memory requirement of approximately 350K (decimal) of 8 bit bytes. The GREMEX system was developed in 1973.

  8. 25 CFR 170.618 - Can a tribe keep savings resulting from project administration?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Can a tribe keep savings resulting from project... Agreements Under Isdeaa § 170.618 Can a tribe keep savings resulting from project administration? When actual... estimated costs, the Secretary will determine the use of the excess funds after consultation with the tribe...

  9. 25 CFR 170.618 - Can a tribe keep savings resulting from project administration?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Can a tribe keep savings resulting from project... Agreements Under Isdeaa § 170.618 Can a tribe keep savings resulting from project administration? When actual... estimated costs, the Secretary will determine the use of the excess funds after consultation with the tribe...

  10. The Administration of Sponsored Programs. Handbook for Developing and Managing Research Activities and Other Projects.

    ERIC Educational Resources Information Center

    Beasley, Kenneth L.; And Others

    Designed as a standard reference and training resource for administrators and project managers, this handbook discusses how to plan, organize, and manage sponsored projects in any organizational setting. It provides detailed, how-to-do-it information and many resources for: negotiating grants, awards, and contracts; organizing a sponsored projects…

  11. Chapter 4: Teachers' and Administrators' Perceptions of the Saber-Tooth Project Reform and of Their Changing Workplace Conditions.

    ERIC Educational Resources Information Center

    Doutis, Panayiotis; Ward, Phillip

    1999-01-01

    Describes changing workplace conditions encountered by middle school physical education teachers and administrators engaged in the Saber-Tooth Project, sharing data from interviews about their perspectives of this project. Findings are organized around the themes of collegiality, planning and assessment, and professionalism, all of which empowered…

  12. Administrative Aspects of Technology Implementation in Special Education. A Synthesis of Information from Eight Federally-Funded Projects.

    ERIC Educational Resources Information Center

    Office of Special Education and Rehabilitative Services (ED), Washington, DC. Div. of Innovation and Development.

    This paper reviews and synthesizes information on the administrative aspects of technology implementation in special education, based on the findings of eight federally funded projects sponsored by the Division of Innovation and Development of the Office of Special Education Programs. Three of the projects specifically focused on administrative…

  13. 36 CFR 218.6 - Reviewing officer.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ADMINISTRATIVE REVIEW PROCESSES Predecisional Administrative Review Process for Hazardous Fuel Reduction Projects... the administrative review processes of other Federal agencies, for authorized hazardous fuel reduction... administrative review. ...

  14. Teacher-Researcher Professional Development: Case Study at Kansas State University

    NASA Astrophysics Data System (ADS)

    Rebello, N. Sanjay; Fletcher, Peter R.

    2006-02-01

    We report on a case study which provides professional development to advanced undergraduate and graduate research team members of the Kansas State University Physics Education Research (KSU-PER) group. An integral component of a student's professional development is the opportunity to participate in a range of research activities and work in collaboration — both as a mentor and a junior researcher with a range of individuals. In order to coordinate and facilitate these opportunities KSU-PER established an ongoing research project investigating students' conceptions of the physics underlying devices. The project utilized an integrated methodological and administrative framework — combining elements from grounded theory, phenomenology and action research. This framework provides a forum and research setting allowing junior and experienced researchers to act in various project management roles and perform a range of research activities. We will conclude by reflecting upon our experiences.

  15. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1993.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1992-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Annual Implementation World Plan (AIWP) presents BPA`s plans for implementing the Program during fiscal year (FY) 1993. The FY 1993 AIWP emphasizes continuation of 143 ongoing or projecting ongoing Programmore » projects, tasks, or task orders, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. The FY 1993 AIWP also contains three new Program projects or tasks that are planned to start in FY 1993.« less

  16. NASA Collaborative Research on the Ultra High Bypass Engine Cycle and Potential Benefits for Noise, Performance, and Emissions

    NASA Technical Reports Server (NTRS)

    Hughes, Christopher E.

    2013-01-01

    The National Aeronautics and Space Administration has taken an active role in collaborative research with the U.S. aerospace industry to investigate technologies to minimize the impact of aviation on the environment. In December 2006, a new program, called the Fundamental Aeronautics Program, was established to enhance U.S. aeronautics technology and conduct research on energy, efficiency and the environment. A project within the overall program, the Subsonic Fixed Wing Project, was formed to focus on research related to subsonic aircraft with specific goals and time based milestones to reduce aircraft noise, emissions and fuel burn. This paper will present an overview of the Subsonic Fixed Wing Project environmental goals and describe a segment of the current research within NASA and also were worked collaboratively with partners from the U.S. aerospace industry related to the next generation of aircraft that will have lower noise, emissions and fuel burn.

  17. U.S. Strategic Nuclear Forces: Background, Developments, and Issues

    DTIC Science & Technology

    2015-03-18

    5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Congressional Research Service,The...extend the life of the missiles and warheads so that they and the submarines can remain in the fleet past 2020. It is designing a new submarine and...modifying and extending the life of the B61 bomb carried on B-2 bombers and fighter aircraft. The Obama Administration completed a review of the size and

  18. BIGOT - NEPTUNE

    DTIC Science & Technology

    1944-05-14

    German military administrator for FRANCE with full control-of all local French officials. He administers local defense, internal security, supervision of...CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING...Date: 3 May 44* ANNEX 1 (INTELLIGENCE) Hq, 82d A/B Div, APO 469s U. S. Army, to 3 lMay 1944 F. 0. 6 MAPS: FRANCE , 1/25,000 GSG6 4347 1/50,000 GSGS 4250 1

  19. Eliminating Space Debris: Applied Technology and Policy Prescriptions, Fall 2007 - Project 07-02

    DTIC Science & Technology

    2008-01-01

    plan to transfer ownership of the constellation, Iridium satellites were (presume that there was more than one) scheduled to be sent out of orbit to...told the research team that administrators are “not shy” about saying, “We have a problem with your debris plan .” Usually, the licensee will work... planned maneuvers • End-of-life (EOL) support. Includes re-entry support and planned de-orbit operations • Anomaly re configuration • Emergency ser

  20. Proceedings from the U.S. Army Corps of Engineers (USACE) and the National Oceanic and Atmospheric Administration (NOAA) Engineering With Nature Workshop

    DTIC Science & Technology

    2017-03-01

    opportunities emerged. It will be essential to capture and share lessons learned as the two organizations plan and implement selected EWN projects...their top five or six opportunities and subsequently selected the two highest priorities. Each of the three breakout groups then worked together to...will ensure agency buy-in, establish local reference sites, and promote EWN principles. Site selection will include an iterative process that factors

  1. Absorption, Distribution, Metabolism, and Excretion of 14C-RDX Following Oral Administration to Minipigs

    DTIC Science & Technology

    2010-08-02

    ELEMENT NUMBER 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 8. PERFORMING... ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S) 11. SPONSOR/MONITOR’S REPORT... Covance Laboratories Inc. 3301 Kinsman Boulevard Madison, WI 53704-2595 Covance 7273-121 U.S. Army Center for Health Promotion and Preventive Medicine

  2. Earth Science Applications Showcase

    NASA Image and Video Library

    2014-08-05

    NASA Administrator Charles Bolden speaks with young professionals about their project during the annual DEVELOP Earth Science Application Showcase at NASA headquarters Tuesday, August 5, 2014. The Earth Science Applications Showcase highlights the work of over 150 participants in the 10-week DEVELOP program that started in June. The DEVELOP Program bridges the gap between NASA Earth science and society, building capacity in both its participants and partner organizations, to better prepare them to handle the challenges that face our society and future generations. Photo Credit: (NASA/Aubrey Gemignani)

  3. 78 FR 9771 - Federal Highway Administration

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-11

    ... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Final Federal Agency Action on Proposed Transportation Project in Illinois and Indiana AGENCY: Federal Highway Administration...., Acting Division Administrator, Federal Highway Administration, 3250 Executive Park Drive, Springfield...

  4. Cross-Cutting Risk Framework: Mining Data for Common Risks Across the Portfolio

    NASA Technical Reports Server (NTRS)

    Klein, Gerald A., Jr.; Ruark, Valerie

    2017-01-01

    The National Aeronautics and Space Administration (NASA) defines risk management as an integrated framework, combining risk-informed decision making and continuous risk management to foster forward-thinking and decision making from an integrated risk perspective. Therefore, decision makers must have access to risks outside of their own project to gain the knowledge that provides the integrated risk perspective. Through the Goddard Space Flight Center (GSFC) Flight Projects Directorate (FPD) Business Change Initiative (BCI), risks were integrated into one repository to facilitate access to risk data between projects. With the centralized repository, communications between the FPD, project managers, and risk managers improved and GSFC created the cross-cutting risk framework (CCRF) team. The creation of the consolidated risk repository, in parallel with the initiation of monthly FPD risk managers and risk governance board meetings, are now providing a complete risk management picture spanning the entire directorate. This paper will describe the challenges, methodologies, tools, and techniques used to develop the CCRF, and the lessons learned as the team collectively worked to identify risks that FPD programs projects had in common, both past and present.

  5. System Administration Support/SWORDS G2

    NASA Technical Reports Server (NTRS)

    Dito, Scott Joseph

    2014-01-01

    The Soldier-Warfighter Operationally Responsive Deployer for Space (SWORDS) rocket is a dedicated small satellite launcher that will minimize danger and complexity in order to allow soldiers in the field to put payloads of up to 25kg into orbit from the field. The SWORDSG2 project is the development of a model, simulation, and ultimately a working application that will control and monitor the cryogenic fluid delivery to the SWORDS rocket for testing purposes. To accomplish this, the project is using the programming language environment Gensym G2. The environment is an all-inclusive application that allows development, testing, modeling, and finally operation of the unique application through graphical and programmatic methods. In addition, observation of the current cryogenic fluid delivery system in the Kennedy Space Center Cry Lab has allowed me to gain valuable experience of fluid systems and propelant delivery that is valuable to our team when developing amd modeling our own system.The ultimate goal of having a test-ready application to show to the heads of the project, and demonstrating G2's capabilities, by late 2014 will require hard work and intense study and understanding of not only the programming aspect but also the physical phenomena we want to model, observe, and control.

  6. Views and considerations on ICT-AT competences development within the ENTELIS project: The Case of Cyprus.

    PubMed

    Mavrou, Katerina; Meletiou-Mavrotheris, Maria

    2015-01-01

    This submission presents part of the EU funded project ENTELIS (European Network for Technology Enhanced Learning in an Inclusive Society), which aims to address issues of digital divide and digital equity for people with disabilities of all ages, and to increase participation and social inclusion. This paper presents the main activities and outcomes of the research work package of the project (WP3), from one of the partner countries, Cyprus. The aim of the conducted research was to identify the conceptions and beliefs of end-users, trainers, and service/technology providers and professionals, on the multifaceted relation between ICT/ICT-AT (Information Communication Technology - Assistive Technology) and learning of technology. Data collection involved the development and administration of three semi-structured interview protocols, one for each group of participants, in five different European countries. Results have been compiled to develop a State-of-Art Report on ICT and ICT-AT education and learning, highlighting the main trends, as well the main present barriers, emergent and future needs in terms of analysis, acquisition and reinforcing of digital competences bridging the worlds of education and work.

  7. Review article: Critical Care Airway Management eLearning modules.

    PubMed

    Doshi, Deepak; McCarthy, Sally; Mowatt, Elizabeth; Cahill, Angela; Peirce, Bronwyn; Hawking, Geoff; Osborne, Ruth; Hibble, Belinda; Ebbs, Katharine

    2017-11-16

    The Australasian College for Emergency Medicine (ACEM) has recently launched the Critical Care Airway Management eLearning modules to support emergency medicine trainees in developing their airway management skills in the ED. A team of emergency physicians and trainees worked collaboratively to develop the eLearning resources ensuring extensive stakeholder consultation. A comprehensive resource manual was written to provide learners with knowledge that underpins the modules. ACEM provided project coordination as well as administrative and technical team support to the production. Although specifically developed with early ACEM trainees in mind, it is envisaged the resources will be useful for all emergency clinicians. The project was funded by the Australian Commonwealth Department of Health. © 2017 Australasian College for Emergency Medicine and Australasian Society for Emergency Medicine.

  8. Alternatives for Jet Engine Control. Volume 1: Modelling and Control Design with Jet Engine Data

    NASA Technical Reports Server (NTRS)

    Sain, M. K.

    1985-01-01

    This document compiles a comprehensive list of publications supported by, or related to, National Aeronautics and Space Administration Grant NSG-3048, entitled "Alternatives for Jet Engine Control". Dr. Kurt Seldner was the original Technical Officer for the grant, at Lewis Research Center. Dr. Bruce Lehtinen was the final Technical Officer. At the University of Notre Dame, Drs. Michael K. Sain and R. Jeffrey Leake were the original Project Directors, with Dr. Sain becoming the final Project Director. Publications cover work over a ten-year period. The Final Report is divided into two parts. Volume i, "Modelling and Control Design with Jet Engine Data", follows in this report. Volume 2, "Modelling and Control Design with Tensors", has been bound separately.

  9. $1. 9 million OKd for Michigan shale project. [Antrim shale deposits

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kreiling, J.

    Dow Chemical Co. has received a $1.9 million Energy Research and Development Administration grant to begin developing ''in-situ'' technology to extract gas and oil from Michigan's vast Antrim shale deposits. Dow estimates that the deposits contain at least 2.5 trillion barrels of crude oil and it is speculated that 10 percent of it is recoverable. Michigan Gov. William G. Milliken says ''Success in this high-risk, unconventional but potentially big-payoff project could substantially ease the energy crunch in Michigan and the nation.'' Michigan imports 95 percent of its fuel. The $1.9 million will get work started and foreshadows a $13 millionmore » contract that will support Dow's research in fracturing and ignition.« less

  10. Maintaining the program balance, volumes 1 and 2

    NASA Technical Reports Server (NTRS)

    Finger, Harold

    1991-01-01

    In March of 1990, the NASA Administrator asked the Academy to perform a study to address the following questions: (1) has NASA contracted too much of its technical work; (2) has NASA's in-house technical capability eroded over time; (3) is in-house engineering and scientific work important to the development of scientists and engineers; and (4) is NASA still able to attract quality scientists and engineers. A panel from the Academy addressed each question separately and came up with the following recommendations: (1) prepare and issue guidance on technical functional areas reserved for in-house performance; (2) convert contracted technical functions to in-house performance if critical to agency programs; (3) provide policy guidance to the centers to retain in-house projects; (4) examine the project mix at each center against agency goals and objectives; (5) institute an annual critical review for all technical disciplines; (6) modify the agency's contractor accountability process; and (7) seek opportunities for greater delegation of resources and technical decision making.

  11. The relationship between work complexity and nurses' participation in decision making in hospitals.

    PubMed

    Bacon, Cynthia Thornton; Lee, Shoou-Yih Daniel; Mark, Barbara

    2015-04-01

    The aim of this study is to examine the relationship between work complexity and nurses' participation in decision making in hospital nursing units. Increasing nurses' participation in decision making has been used as a way to manage work complexity; however, the work of nurses in acute care hospitals has become highly complex, and strategies used to manage this complexity have not been fully explored. The relationship between work complexity and nurse participation in decision making was examined using data from the Outcomes Research in Nursing Administration project. The sample included 3,718 RNs in 278 medical-surgical units in 143 hospitals. When work complexity increased, nurses' participation in decision making decreased. When nurses have limited input into decision making, the information available to the care team may be incomplete. Barriers to nurses' participation in decision making should be explored and interventions developed so that nurses may be full participants in decision making affecting both patients and the work environment.

  12. Day-to-day management of EU projects: Implementation of a local manager network to secure knowledge transfer

    NASA Astrophysics Data System (ADS)

    Hoffmann, Friederike; Meyer, Stefanie; de Vareilles, Mahaut

    2017-04-01

    In the past years there has been a strong push in Norway for increasing participation in the EU Framework Programmes for Research and Innovation. EU projects coordinated by the University of Bergen (UiB) usually receive management support from the central administration (mostly financial) in collaboration with a full- or part-time scientific project manager working on a fixed-term contract at the same institute as the project's principal scientist. With an increasing amount of granted EU projects, the number of scientific project managers employed across the whole university has also increased, and a need for coordination and professionalization of this service became obvious. Until recently, UiB had no unified structures and routines for training of newly recruited project managers, or for archiving and transferring routines and skills after the end of the project and the manager's employment contract. To overcome this administrative knowledge gap, the "Forum for scientific EU project managers at UiB" was founded in spring 2016 as an informal communication platform. Its purpose is to bring together current and previous scientific EU project managers from different disciplines to share their experiences. The main aim of the forum is to transfer and improve knowledge, skills and routines on effective management of EU funded projects, but also to function as a discussion forum where issues arising from handling international consortia can be reviewed. The group meets monthly and discusses current challenges from on-going EU projects as well as routines for specific project operation tasks. These routines are archived in an online best-practise guide which the group currently develops. The regular personal meetings are supplemented with an intense communication via a group mailing list and several individual mail- and phone-meetings. Since lessons learned during project implementation may improve future proposals, UiB research advisors for proposal support frequently interact with the members of the forum. The forum is also used to spread relevant information received from other sources. We already realize that the forum and its products lead to increased competence of scientific EU project managers and research advisors at UiB. To further harvest these synergy effects, we aim to increase our interaction with similar groups, networks, and online platforms in and beyond Europe.

  13. [A project to ameliorate nurses working overtime in psychiatry ward].

    PubMed

    Feng, Yuen-Hsiang; Li, Hsiu-Chen; Fang, Mao-So

    2009-12-01

    The authors found nurses working in psychiatry wards were frequently required to work overtime, with average overtime measuring 85 minutes. After analysis, we found main factors leading to overtime to be late new patient admissions, tardy ward inspections by attending physicians, failure to implement workplace regulations, failure by nurses to implement proper shift transfer procedures, and meeting-related delays. This paper proposes an approach by which average overtime for psychiatry ward nurses may be reduced from 85 to 30 minutes. Based on findings, the researchers adjusted the schedule for ward visits by attending physicians, updated and streamlined workplace regulations, ensured administrative procedures were precisely followed, and updated and streamlined standing orders. Average overtime was reduced from 85 to 25 minutes. This research facilitated a reduction in the amount of overtime registered by nurses.

  14. Quality of Construction Central Artery / Third Harbor Tunnel Federal Highway Administration Region 1

    DOT National Transportation Integrated Search

    1996-12-19

    The objective of this audit was to evaluate the Federal Highway : Administration's (FHWA) oversight of the Central Artery / Third Harbor Tunnel : Project's (Project) testing procedures to ensure construction was completed in : accordance with applica...

  15. Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects

    DOT National Transportation Integrated Search

    1996-01-01

    These standard specifications were issued primarily for constructing roads and bridges on Federal Highway projects under the direct administration of the Federal Highway Administration. These specifications are cited as "FP-96" indicating Standard Sp...

  16. Library Services and Construction Act (LSCA). South Carolina State-Administration Annual Program, 1992-1993.

    ERIC Educational Resources Information Center

    South Carolina State Library, Columbia.

    Supporting documentation for the grant and use of Federal Library Services and Construction Act (LSCA) funds in South Carolina is presented in this annual program. Under Title I, Library Services, the bulk of the grant money is planned for the following projects: (1) general administration (Project I-A); (2) library interpretation (Project I-B);…

  17. The Family Support System: Comparative Analysis of Research Projects Funded by the Administration on Aging.

    ERIC Educational Resources Information Center

    Hofer, Andrew

    This paper presents a comparative analysis of eight research projects funded by the Administration on Aging during the 1970s which focused on the family as caregivers and support systems for elderly relatives. A brief description is provided for each project analyzed in this report as well as highlights of major findings, including that the family…

  18. School Capital Manual. An Interim Guide for School Boards, Administrators, Facility Planners and Consultants Who Engage in School Building Projects.

    ERIC Educational Resources Information Center

    Alberta Dept. of Education, Edmonton.

    This manual is intended for use by the Alberta, Canada, school boards, administrators, consultants, education staff, and other individuals involved in school building projects. The purpose of the School Capital Plan, funding, and Alberta Education's funding framework are detailed. The school building project components of the School Capital Plan…

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Gary E.

    This annual report is a deliverable for fiscal year 2006 (FY06) for Project 2002-077-00, Facilitation of the Estuary/Ocean Subgroup (EOS). The EOS is part of the research, monitoring, and evaluation (RME) effort the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to the 2000 and 2004 Biological Opinions on operation of the Federal Columbia River Power System. The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates implementation of the Estuary RME Plan. In FY06, EOS project accomplishments included: 1) subgroup meetings; 2)more » participation in the estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; 3) project management via the project tracking system, PISCES; 4) quarterly project status reports; and 5) a major revision to the Estuary RME Plan (new version May 2006) based on comments by EOS members, the Independent Scientific Review Panel, and other reviewers. In the context of uncertainty about the direction of the federal RME due to litigation on the FCRPS Biological Opinion, FY06 activities for the EOS project resulted in expanded substantive coordination with other regional RME forums, project tracking infrastructure, and a new version of the Estuary RME Plan.« less

  20. Internationalization Measures in Large Scale Research Projects

    NASA Astrophysics Data System (ADS)

    Soeding, Emanuel; Smith, Nancy

    2017-04-01

    Internationalization measures in Large Scale Research Projects Large scale research projects (LSRP) often serve as flagships used by universities or research institutions to demonstrate their performance and capability to stakeholders and other interested parties. As the global competition among universities for the recruitment of the brightest brains has increased, effective internationalization measures have become hot topics for universities and LSRP alike. Nevertheless, most projects and universities are challenged with little experience on how to conduct these measures and make internationalization an cost efficient and useful activity. Furthermore, those undertakings permanently have to be justified with the Project PIs as important, valuable tools to improve the capacity of the project and the research location. There are a variety of measures, suited to support universities in international recruitment. These include e.g. institutional partnerships, research marketing, a welcome culture, support for science mobility and an effective alumni strategy. These activities, although often conducted by different university entities, are interlocked and can be very powerful measures if interfaced in an effective way. On this poster we display a number of internationalization measures for various target groups, identify interfaces between project management, university administration, researchers and international partners to work together, exchange information and improve processes in order to be able to recruit, support and keep the brightest heads to your project.

  1. The Characteristics of Project Managers: An Exploration of Complex Projects in the National Aeronautics and Space Administration

    NASA Technical Reports Server (NTRS)

    Mulenburg, Gerald M.

    2000-01-01

    Study of characteristics and relationships of project managers of complex projects in the National Aeronautics and Space Administration. Study is based on Research Design, Data Collection, Interviews, Case Studies, and Data Analysis across varying disciplines such as biological research, space research, advanced aeronautical test facilities, aeronautic flight demonstrations, and projects at different NASA centers to ensure that findings were not endemic to one type of project management, or to one Center's management philosophies. Each project is treated as a separate case with the primary data collected during semi-structured interviews with the project manager responsible for the overall project. Results of the various efforts show some definite similarities of characteristics and relationships among the project managers in the study. A model for how the project managers formulated and managed their projects is included.

  2. 78 FR 26112 - Limitation on Claims Against Proposed Public Transportation Projects; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Limitation on Claims Against Proposed Public Transportation Projects; Correction AGENCY: Federal Transit Administration (FTA), DOT. ACTION... Register on April 22, 2013, concerning a limitation on claims for certain specified public transportation...

  3. Djeen (Database for Joomla!'s Extensible Engine): a research information management system for flexible multi-technology project administration.

    PubMed

    Stahl, Olivier; Duvergey, Hugo; Guille, Arnaud; Blondin, Fanny; Vecchio, Alexandre Del; Finetti, Pascal; Granjeaud, Samuel; Vigy, Oana; Bidaut, Ghislain

    2013-06-06

    With the advance of post-genomic technologies, the need for tools to manage large scale data in biology becomes more pressing. This involves annotating and storing data securely, as well as granting permissions flexibly with several technologies (all array types, flow cytometry, proteomics) for collaborative work and data sharing. This task is not easily achieved with most systems available today. We developed Djeen (Database for Joomla!'s Extensible Engine), a new Research Information Management System (RIMS) for collaborative projects. Djeen is a user-friendly application, designed to streamline data storage and annotation collaboratively. Its database model, kept simple, is compliant with most technologies and allows storing and managing of heterogeneous data with the same system. Advanced permissions are managed through different roles. Templates allow Minimum Information (MI) compliance. Djeen allows managing project associated with heterogeneous data types while enforcing annotation integrity and minimum information. Projects are managed within a hierarchy and user permissions are finely-grained for each project, user and group.Djeen Component source code (version 1.5.1) and installation documentation are available under CeCILL license from http://sourceforge.net/projects/djeen/files and supplementary material.

  4. Djeen (Database for Joomla!’s Extensible Engine): a research information management system for flexible multi-technology project administration

    PubMed Central

    2013-01-01

    Background With the advance of post-genomic technologies, the need for tools to manage large scale data in biology becomes more pressing. This involves annotating and storing data securely, as well as granting permissions flexibly with several technologies (all array types, flow cytometry, proteomics) for collaborative work and data sharing. This task is not easily achieved with most systems available today. Findings We developed Djeen (Database for Joomla!’s Extensible Engine), a new Research Information Management System (RIMS) for collaborative projects. Djeen is a user-friendly application, designed to streamline data storage and annotation collaboratively. Its database model, kept simple, is compliant with most technologies and allows storing and managing of heterogeneous data with the same system. Advanced permissions are managed through different roles. Templates allow Minimum Information (MI) compliance. Conclusion Djeen allows managing project associated with heterogeneous data types while enforcing annotation integrity and minimum information. Projects are managed within a hierarchy and user permissions are finely-grained for each project, user and group. Djeen Component source code (version 1.5.1) and installation documentation are available under CeCILL license from http://sourceforge.net/projects/djeen/files and supplementary material. PMID:23742665

  5. Oppenheimer's Box of Chocolates: Remediation of the Manhattan Project Landfill at Los Alamos National Laboratory - 12283

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Allen, Donald L.; Ramsey, Susan S.; Finn, Kevin P.

    2012-07-01

    Material Disposal Area B (MDA B) is the oldest radioactive waste disposal facility at Los Alamos National Laboratory. Operated from 1944-48, MDA B was the disposal facility for the Manhattan Project. Recognized as one of the most challenging environmental remediation projects at Los Alamos, the excavation of MDA B received $110 million from the American Recovery and Reinvestment Act of 2009 to accelerate this complex remediation work. Several factors combined to create significant challenges to remediating the landfill known in the 1940's as the 'contaminated dump'. The secrecy surrounding the Manhattan Project meant that no records were kept of radiologicalmore » materials and chemicals disposed or of the landfill design. An extensive review of historical documents and interviews with early laboratory personnel resulted in a list of hundreds of hazardous chemicals that could have been buried in MDA B. Also, historical reports of MDA B spontaneously combusting on three occasions -with 50-foot flames and pink smoke spewing across the mesa during the last incident in 1948-indicated that hazardous materials were likely present in MDA B. To complicate matters further, though MDA B was located on an isolated mesa in the 1940's, the landfill has since been surrounded by a Los Alamos commercial district. The local newspaper, hardware store and a number of other businesses are located directly across the street from MDA B. This close proximity to the public and the potential for hazardous materials in MDA B necessitated conducting remediation work within protective enclosures. Potential chemical hazards and radiological inventory were better defined using a minimally intrusive sampling method called direct push technology (DPT) prior to excavation. Even with extensive sampling and planning the project team encountered many surprises and challenges during the project. The one area where planning did not fail to meet reality was safety. There were no serious worker injuries and the minor injuries recorded were those common to construction type activities. Extensive monitoring along the site boundary demonstrated that no hazardous chemicals were released and radiological dose to the public was within administrative limits. More than three years of effort by the LANL project team went into the planning for remediation of Material Disposal Area B. Hundreds of historical documents were reviewed; retired personnel were extensively interviewed and noninvasive techniques were used to characterize the site. The information collected was incorporated into the safety requirements, cost estimate, schedule and primary execution plan for the project. Ultimately the waste volume managed by the project approached 40000 m{sup 3}, more than double the original project estimate. This increase had a major impact on both project cost and schedule. Nuclear safety requirements for the project were based on an estimated MDA B radionuclide inventory of 12 PE-Ci. When excavation was complete over 123 PE-Ci had been removed from the trenches. The radionuclide inventory at MDA B was an order of magnitude higher than estimated. Work at MDA B could not have proceeded without the safety basis exemption from DOE-HQ. The one area where planning did not fail to meet reality was safety. There were no serious worker injuries and the minor injuries recorded were those common to construction type activities. Extensive monitoring along the site boundary demonstrated that no hazardous chemicals were released and radiological dose to the public was within administrative limits. (authors)« less

  6. Comparisons of self-ratings on managerial competencies, research capability, time management, executive power, workload and work stress among nurse administrators.

    PubMed

    Kang, Chun-Mei; Chiu, Hsiao-Ting; Hu, Yi-Chun; Chen, Hsiao-Lien; Lee, Pi-Hsia; Chang, Wen-Yin

    2012-10-01

    To assess the level of and the differences in managerial competencies, research capability, time management, executive power, workload and work-stress ratings among nurse administrators (NAs), and to determine the best predictors of managerial competencies for NAs. Although NAs require multifaceted managerial competencies, research related to NAs' managerial competencies is limited. A cross-sectional survey was conducted with 330 NAs from 16 acute care hospitals. Managerial competencies were determined through a self-developed questionnaire. Data were collected in 2011. All NAs gave themselves the highest rating on integrity and the lowest on both financial/budgeting and business acumen. All scores for managerial competencies, research capability, time management and executive power showed a statistically significant correlation. The stepwise regression analysis revealed that age; having received NA training; having completed a nursing project independently; and scores for research capability, executive power and workload could explain 63.2% of the total variance in managerial competencies. The present study provides recommendations for future administrative training programmes to increase NAs' managerial competency in fulfilling their management roles and functions. The findings inform leaders of hospitals where NAs need to develop additional competencies concerning the type of training NAs need to function proficiently. © 2012 Blackwell Publishing Ltd.

  7. Annual ADP planning document

    NASA Technical Reports Server (NTRS)

    Mogilevsky, M.

    1973-01-01

    The Category A computer systems at KSC (Al and A2) which perform scientific and business/administrative operations are described. This data division is responsible for scientific requirements supporting Saturn, Atlas/Centaur, Titan/Centaur, Titan III, and Delta vehicles, and includes realtime functions, Apollo-Soyuz Test Project (ASTP), and the Space Shuttle. The work is performed chiefly on the GEL-635 (Al) system located in the Central Instrumentation Facility (CIF). The Al system can perform computations and process data in three modes: (1) real-time critical mode; (2) real-time batch mode; and (3) batch mode. The Division's IBM-360/50 (A2) system, also at the CIF, performs business/administrative data processing such as personnel, procurement, reliability, financial management and payroll, real-time inventory management, GSE accounting, preventive maintenance, and integrated launch vehicle modification status.

  8. Marketing Strategy Research

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This report documents the research that has been undertaken as background for preparation of a marketing campaign for middle and high school students to increase interest in national security careers at the National Nuclear Security Administration. This work is a part of the National Security Preparedness Project (NSPP), being performed under a Department of Energy (DOE)/National Nuclear Security Administration (NNSA) grant. Previous research on the development of a properly trained and skilled national security workforce has identified a lack of interest by k-12 students in the STEM (Science, Technology, Engineering, and Mathematics) fields. Further, participation in these careers by womenmore » and minority populations is limited and is not increasing. Added to this are low educational achievement levels in New Mexico, where the marketing campaign will be deployed.« less

  9. Extending the Pathway: Building on a National Science Foundation Workforce Development Project for Underserved k-12 Students

    NASA Astrophysics Data System (ADS)

    Slattery, W.; Smith, T.

    2014-12-01

    With new career openings in the geosciences expected and a large number of presently employed geoscientists retiring in the next decade there is a critical need for a new cadre of geoscientists to fill these positions. A project funded by the National Science Foundation titled K-12 Students, Teachers, Parents, Administrators and Higher Education Faculty: Partners Helping Rural Disadvantaged Students Stay on the Pathway to a Geoscience Career involving Wright State University and the Ripley, Lewis, Union, Huntington k-12 school district in Appalachian Ohio took led to dozens of seventh and eighth grade students traveling to Sandy Hook, New Jersey for a one week field experience to study oceanography with staff of the New Jersey Sea Grant Consortium. Teachers, parent chaperones, administrators and university faculty accompanied the students in the field. Teachers worked alongside their students in targeted professional development during the weeklong field experience. During the two academic years of the project, both middle school and high school teachers received professional development in Earth system science so that all students, not just those that were on the summer field experience could receive enhanced science learning. All ninth grade high school students were given the opportunity to take a high school/college dual credit Earth system science course. Community outreach provided widespread knowledge of the project and interest among parents to have their children participate. In addition, ninth grade students raised money themselves to fund a trip to the International Field Studies Forfar Field Station on Andros Island, Bahamas to study a tropical aquatic system. Students who before this project had never traveled outside of Ohio are currently discussing ways that they can continue on the pathway to a geoscience career by applying for internships for the summer between their junior and senior years. These are positive steps towards taking charge of their own learning and shows promise of raising parents, teachers, administrators and other k-12 students awareness of educational opportunities in the geosciences, confidence in the ability of underserved rural students to reach their educational goals and supporting them through the critical middle and high school years towards a geoscience career.

  10. 75 FR 33757 - Major Capital Investment Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-15

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration 49 CFR Part 611 [Docket No. FTA-2010-0009] RIN 2132-AB02 Major Capital Investment Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Public meetings on ANPRM. SUMMARY: This document announces the dates, times, and locations of...

  11. 5 CFR 890.1302 - Duration.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Duration. 890.1302 Section 890.1302 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) FEDERAL... Demonstration Project § 890.1302 Duration. The demonstration project will run from January 1, 2000, through...

  12. Western Illinois University Curriculum Revitalization Project. Final Report 1990-91.

    ERIC Educational Resources Information Center

    Western Illinois Univ., Macomb.

    The primary purpose of the Curriculum Revitalization Project was to provide assistance to Illinois vocational educators, administrators, regional administrators, and regional delivery system directors in strengthening vocational programs. Ten major accomplishments were achieved: (1) seven regional instructional materials coordinators (IMCs) were…

  13. KENNEDY SPACE CENTER, FLA. - Justin Manley, of the National Oceanic and Atmospheric Administration, is a member of the research team conducting underwater acoustic research in the Launch Complex 39 turn basin near Launch Pad 39A. Several government agencies, including NASA, NOAA, the Navy, the Coast Guard, and the Florida Fish and Wildlife Commission are involved in the testing. The research involves demonstrations of passive and active sensor technologies, with applications in fields ranging from marine biological research to homeland security. The work is also serving as a pilot project to assess the cooperation between the agencies involved. Equipment under development includes a passive acoustic monitor developed by NASA’s Jet Propulsion Laboratory, and mobile robotic sensors from the Navy’s Mobile Diving and Salvage Unit.

    NASA Image and Video Library

    2003-08-18

    KENNEDY SPACE CENTER, FLA. - Justin Manley, of the National Oceanic and Atmospheric Administration, is a member of the research team conducting underwater acoustic research in the Launch Complex 39 turn basin near Launch Pad 39A. Several government agencies, including NASA, NOAA, the Navy, the Coast Guard, and the Florida Fish and Wildlife Commission are involved in the testing. The research involves demonstrations of passive and active sensor technologies, with applications in fields ranging from marine biological research to homeland security. The work is also serving as a pilot project to assess the cooperation between the agencies involved. Equipment under development includes a passive acoustic monitor developed by NASA’s Jet Propulsion Laboratory, and mobile robotic sensors from the Navy’s Mobile Diving and Salvage Unit.

  14. Shillapoo Wildlife Area, Annual Report 2007-2008.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Calkins, Brian

    This report summarizes accomplishments, challenges and successes on WDFW's Shillapoo Wildlife Area funded under Bonneville Power Administration's (BPA) Wildlife Mitigation Program (BPA project No.2003-012-00) during the Fiscal Year 08 contract period October 1, 2007-September 30, 2008. The information presented here is intended to supplement that contained in BPA's PISCES contract development and reporting system. The organization below is by broad categories of work but references are made to individual work elements in the PISCES Statement of Work as appropriate. Significant progress was realized in almost all major work types. Of particular note was progress made in tree plantings and pasturemore » rehabilitation efforts. This year's tree planting effort included five sites detailed below and in terms of the number of plants was certainly the largest effort on the wildlife area to date in one season. The planting itself took a significant amount of time, which was anticipated. However, installation of mats and tubes took much longer than expected which impacted planned fence projects in particular. Survival of the plantings appears to be good. Improvement to the quality of waterfowl pasture habitats is evident on a number of sites due to replanting and weed control efforts. Continuing long-term weed control efforts will be key in improving this particular type of habitat. A prolonged cold, wet spring and a number of equipment breakdowns presented stumbling blocks that impacted schedules and ultimately progress on planned activities. The unusual spring weather delayed fieldwork on pasture planting projects as well as weed control and slowed the process of maintaining trees and shrubs. This time lag also caused the continued deferral of some of our fencing projects. The large brush hog mower had the driveline break twice and the smaller tractor had an engine failure that caused it to be down for over a month. We have modified our budget plan for next year to include a temporary employee that will work primarily on tree maintenance and fencing projects to make sure that we make progress in these areas and we will be investigating whether a heavier duty driveline can be obtained for the mower.« less

  15. Operations analysis for lunar surface construction: Results of two office of exploration case studies

    NASA Astrophysics Data System (ADS)

    Bell, Lisa Y.; Boles, Walter; Smith, Alvin

    1991-08-01

    In an environment of intense competition for Federal funding, the U.S. space research community is responsible for developing a feasible, cost-effective approach to establishing a surface base on the moon to fulfill long-term Government objectives. This report presents the results of a construction operations analysis of two lunar scenarios provided by the National Aeronautics and Space Administration (NASA). Activities necessary to install the lunar base surface elements are defined and scheduled, based on the productivities and availability of the base resources allocated to the projects depicted in each scenario. The only construction project in which the required project milestones were not completed within the nominal timeframe was the initial startup phase of NASA's FY89 Lunar Evolution Case Study (LECS), primarily because this scenario did not include any Earth-based telerobotic site preparation before the arrival of the first crew. The other scenario analyzed. Reference Mission A from NASA's 90-Day Study of the Human Exploration of the Moon and Mars, did use telerobotic site preparation before the manned phase of the base construction. Details of the analysis for LECS are provided, including spreadsheets indicating quantities of work and Gantt charts depicting the general schedule for the work. This level of detail is not presented for the scenario based on the 90-Day Study because many of the projects include the same (or similar) surface elements and facilities.

  16. A contrast between DEMATEL-ANP and ANP methods for six sigma project selection: a case study in healthcare industry.

    PubMed

    Ortíz, Miguel A; Felizzola, Heriberto A; Nieto Isaza, Santiago

    2015-01-01

    The project selection process is a crucial step for healthcare organizations at the moment of implementing six sigma programs in both administrative and caring processes. However, six-sigma project selection is often defined as a decision making process with interaction and feedback between criteria; so that it is necessary to explore different methods to help healthcare companies to determine the Six-sigma projects that provide the maximum benefits. This paper describes the application of both ANP (Analytic Network process) and DEMATEL (Decision Making trial and evaluation laboratory)-ANP in a public medical centre to establish the most suitable six sigma project and finally, these methods were compared to evaluate their performance in the decision making process. ANP and DEMATEL-ANP were used to evaluate 6 six sigma project alternatives under an evaluation model composed by 3 strategies, 4 criteria and 15 sub-criteria. Judgement matrixes were completed by the six sigma team whose participants worked in different departments of the medical centre. The improving of care opportunity in obstetric outpatients was elected as the most suitable six sigma project with a score of 0,117 as contribution to the organization goals. DEMATEL-ANP performed better at decision making process since it reduced the error probability due to interactions and feedback. ANP and DEMATEL-ANP effectively supported six sigma project selection processes, helping to create a complete framework that guarantees the prioritization of projects that provide maximum benefits to healthcare organizations. As DEMATEL- ANP performed better, it should be used by practitioners involved in decisions related to the implementation of six sigma programs in healthcare sector accompanied by the adequate identification of the evaluation criteria that support the decision making model. Thus, this comparative study contributes to choosing more effective approaches in this field. Suggestions of further work are also proposed so that these methods can be applied more adequate in six sigma project selection processes in healthcare.

  17. A contrast between DEMATEL-ANP and ANP methods for six sigma project selection: a case study in healthcare industry

    PubMed Central

    2015-01-01

    Background The project selection process is a crucial step for healthcare organizations at the moment of implementing six sigma programs in both administrative and caring processes. However, six-sigma project selection is often defined as a decision making process with interaction and feedback between criteria; so that it is necessary to explore different methods to help healthcare companies to determine the Six-sigma projects that provide the maximum benefits. This paper describes the application of both ANP (Analytic Network process) and DEMATEL (Decision Making trial and evaluation laboratory)-ANP in a public medical centre to establish the most suitable six sigma project and finally, these methods were compared to evaluate their performance in the decision making process. Methods ANP and DEMATEL-ANP were used to evaluate 6 six sigma project alternatives under an evaluation model composed by 3 strategies, 4 criteria and 15 sub-criteria. Judgement matrixes were completed by the six sigma team whose participants worked in different departments of the medical centre. Results The improving of care opportunity in obstetric outpatients was elected as the most suitable six sigma project with a score of 0,117 as contribution to the organization goals. DEMATEL-ANP performed better at decision making process since it reduced the error probability due to interactions and feedback. Conclusions ANP and DEMATEL-ANP effectively supported six sigma project selection processes, helping to create a complete framework that guarantees the prioritization of projects that provide maximum benefits to healthcare organizations. As DEMATEL- ANP performed better, it should be used by practitioners involved in decisions related to the implementation of six sigma programs in healthcare sector accompanied by the adequate identification of the evaluation criteria that support the decision making model. Thus, this comparative study contributes to choosing more effective approaches in this field. Suggestions of further work are also proposed so that these methods can be applied more adequate in six sigma project selection processes in healthcare. PMID:26391445

  18. Building Faculty Community: Fellowship in Graduate Medical Education Administration

    PubMed Central

    Edler, Alice A.; Dohn, Ann; Davidson, Heather A.; Grewal, Daisy; Behravesh, Bardia; Piro, Nancy

    2009-01-01

    Introduction The Department of Graduate Medical Education at Stanford Hospital and Clinics has developed a professional training program for program directors. This paper outlines the goals, structure, and expected outcomes for the one-year Fellowship in Graduate Medical Education Administration program. Background The skills necessary for leading a successful Accreditation Council for Graduate Medical Education (ACGME) training program require an increased level of curricular and administrative expertise. To meet the ACGME Outcome Project goals, program directors must demonstrate not only sophisticated understanding of curricular design but also competency-based performance assessment, resource management, and employment law. Few faculty-development efforts adequately address the complexities of educational administration. As part of an institutional-needs assessment, 41% of Stanford program directors indicated that they wanted more training from the Department of Graduate Medical Education. Intervention To address this need, the Fellowship in Graduate Medical Education Administration program will provide a curriculum that includes (1) readings and discussions in 9 topic areas, (2) regular mentoring by the director of Graduate Medical Education (GME), (3) completion of a service project that helps improve GME across the institution, and (4) completion of an individual scholarly project that focuses on education. Results The first fellow was accepted during the 2008–2009 academic year. Outcomes for the project include presentation of a project at a national meeting, internal workshops geared towards disseminating learning to peer program directors, and the completion of a GME service project. The paper also discusses lessons learned for improving the program. PMID:21975722

  19. The Challenges of a Complex and Innovative Telehealth Project: A Qualitative Evaluation of the Eastern Quebec Telepathology Network.

    PubMed

    Alami, Hassane; Fortin, Jean-Paul; Gagnon, Marie-Pierre; Pollender, Hugo; Têtu, Bernard; Tanguay, France

    2017-09-13

    The Eastern Quebec Telepathology Network (EQTN) has been implemented in the province of Quebec (Canada) to support pathology and surgery practices in hospitals that are lack of pathologists, especially in rural and remote areas. This network includes 22 hospitals and serves a population of 1.7 million inhabitants spread over a vast territory. An evaluation of this network was conducted in order to identify and analyze the factors and issues associated with its implementation and deployment, as well as those related to its sustainability and expansion. Qualitative evaluative research based on a case study using: (1) historical analysis of the project documentation (newsletters, minutes of meetings, articles, ministerial documents, etc); (2) participation in meetings of the committee in charge of telehealth programs and the project; and (3) interviews, focus groups, and discussions with different stakeholders, including decision-makers, clinical and administrative project managers, clinicians (pathologists and surgeons), and technologists. Data from all these sources were cross-checked and synthesized through an integrative and interpretative process. The evaluation revealed numerous socio-political, regulatory, organizational, governance, clinical, professional, economic, legal and technological challenges related to the emergence and implementation of the project. In addition to technical considerations, the development of this network was associated with major changes and transformations of production procedures, delivery and organization of services, clinical practices, working methods, and clinicaladministrative processes and cultures (professional/organizational). The EQTN reflects the complex, structuring, and innovative projects that organizations and health systems are required to implement today. Future works should be more sensitive to the complexity associated with the emergence of telehealth networks and no longer reduce them to technological considerations. © 2018 The Author(s); Published by Kerman University of Medical Sciences. This is an open-access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

  20. UAS in the NAS: Survey Responses by ATC, Manned Aircraft Pilots, and UAS Pilots

    NASA Technical Reports Server (NTRS)

    Comstock, James R., Jr.; McAdaragh, Raymon; Ghatas, Rania W.; Burdette, Daniel W.; Trujillo, Anna C.

    2014-01-01

    NASA currently is working with industry and the Federal Aviation Administration (FAA) to establish future requirements for Unmanned Aircraft Systems (UAS) flying in the National Airspace System (NAS). To work these issues NASA has established a multi-center "UAS Integration in the NAS" project. In order to establish Ground Control Station requirements for UAS, the perspective of each of the major players in NAS operations was desired. Three on-line surveys were administered that focused on Air Traffic Controllers (ATC), pilots of manned aircraft, and pilots of UAS. Follow-up telephone interviews were conducted with some survey respondents. The survey questions addressed UAS control, navigation, and communications from the perspective of small and large unmanned aircraft. Questions also addressed issues of UAS equipage, especially with regard to sense and avoid capabilities. From the civilian ATC and military ATC perspectives, of particular interest are how mixed operations (manned / UAS) have worked in the past and the role of aircraft equipage. Knowledge gained from this information is expected to assist the NASA UAS Integration in the NAS project in directing research foci thus assisting the FAA in the development of rules, regulations, and policies related to UAS in the NAS.

  1. UAS in the NAS: Survey Responses by ATC, Manned Aircraft Pilots, and UAS Pilots

    NASA Technical Reports Server (NTRS)

    Comstock, James R., Jr.; McAdaragh, Raymon; Ghatas, Rania W.; Burdette, Daniel W.; Trujillo, Anna C.

    2013-01-01

    NASA currently is working with industry and the Federal Aviation Administration (FAA) to establish future requirements for Unmanned Aircraft Systems (UAS) flying in the National Airspace System (NAS). To work these issues NASA has established a multi-center UAS Integration in the NAS project. In order to establish Ground Control Station requirements for UAS, the perspective of each of the major players in NAS operations was desired. Three on-line surveys were administered that focused on Air Traffic Controllers (ATC), pilots of manned aircraft, and pilots of UAS. Follow-up telephone interviews were conducted with some survey respondents. The survey questions addressed UAS control, navigation, and communications from the perspective of small and large unmanned aircraft. Questions also addressed issues of UAS equipage, especially with regard to sense and avoid capabilities. From the ATC and military ATC perspective, of particular interest is how mixed-operations (manned/UAS) have worked in the past and the role of aircraft equipage. Knowledge gained from this information is expected to assist the NASA UAS in the NAS project in directing research foci thus assisting the FAA in the development of rules, regulations, and policies related to UAS in the NAS.

  2. Measuring Work Values of Public School Administrators.

    ERIC Educational Resources Information Center

    Hales, Loyde W.; Waggoner, Jacqueline

    This paper presents the results of research investigating (1) the reliability and validity of the Ohio Work Values Inventory (OWVI) when used with public school administrators; (2) the work values of public school administrators; (3) differences in work values of male and female administrators; and (4) differences in work values of individuals at…

  3. 75 FR 39492 - Major Capital Investment Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-09

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration 49 CFR Part 611 [Docket No. FTA-2010-0009] RIN 2132-AB02 Major Capital Investment Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Public meetings on ANPRM. SUMMARY: This document announces the date, time, and location of an...

  4. 76 FR 46357 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-02

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Notice of Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... that FTA has taken final agency actions by issuing certain approvals for the public transportation...

  5. 24 CFR 880.505 - Contract administration and conversions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... conversions. 880.505 Section 880.505 Housing and Urban Development Regulations Relating to Housing and Urban... Housing Assistance Payments Contract § 880.505 Contract administration and conversions. (a) Contract... finances the project. (c) Conversion of Projects from one Ownership/Contractual arrangement to another. Any...

  6. 24 CFR 880.505 - Contract administration and conversions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... conversions. 880.505 Section 880.505 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN... Housing Assistance Payments Contract § 880.505 Contract administration and conversions. (a) Contract... finances the project. (c) Conversion of Projects from one Ownership/Contractual arrangement to another. Any...

  7. 7 CFR 1709.121 - Administrator's review and selection of grant awards.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... finalists for grant awards after consideration of the applications, the rankings, comments, and... application materials, ranking panel ratings, comments, and recommendations, and other pertinent information... award to the next highest ranking project. (c) The projects selected by the Administrator will be funded...

  8. Academic Leaders as Thermostats

    ERIC Educational Resources Information Center

    Kekale, Jouni

    2003-01-01

    University of Jones launched a two-year development and training project on academic management and leadership in the beginning of 2002. Open seminars were arranged for heads for departments, deans and administrative managers. In addition, personnel administration started pilot projects with two departments in co-operation with the Finnish…

  9. SEA Change: Bringing together Science, Engineering and the Arts at the University of Florida

    NASA Astrophysics Data System (ADS)

    Perfit, M. R.; Mertz, M. S.; Lavelli, L.

    2014-12-01

    A group of interested and multifaceted faculty, administrators and students created the Science, Engineering, Arts Committee (SEA Change) two years ago at the University of Florida (UF). Recognizing that innovative ideas arise from the convergence of divergent thinkers, the committee seeks to bring together faculty in Science, Engineering, the Arts and others across campus to develop and disseminate innovative ideas for research, teaching and service that will enhance the campus intellectual environment. We meet regularly throughout the year as faculty with graduate and undergraduate students to catalyze ideas that could lead to collaborative or interdisciplinary projects and make recommendations to support innovative, critical and creative work. As an example, the Department of Geological Sciences and the School of Art and Art History collaborated on a competition among UF undergraduate painting students to create artistic works that related to geoscience. Each student gathered information from Geological Sciences faculty members to use for inspiration in creating paintings along with site-specific proposals to compete for a commission. The winning work was three-story high painting representing rock strata and the Florida environment entitled "Prairie Horizontals" that is now installed in the Geoscience building entrance atrium. Two smaller paintings of the second place winner, depicting geologists in the field were also purchased and displayed in a main hallway. Other activities supported by SEA Change have included a collaborative work of UF engineering and dance professors who partnered for the Creative Storytelling and Choreography Lab, to introduce basic storytelling tools to engineering students. A campus-wide gathering of UF faculty and graduate students titled Creative Practices: The Art & Science of Discovery featured guest speakers Steven Tepper, Victoria Vesna and Benjamin Knapp in spring 2014. The Committee plans to develop and foster ideas that will lead to more collaborative or interdisciplinary projects and make recommendations to the administration to support a creative environment across disciplines on UF campus.

  10. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, GE; Diefenderfer, HL

    The Estuary/Ocean Subgroup (EOS) is part of the research, monitoring, and evaluation (RME) effort that the Action Agencies (Bonneville Power Administration (BPA), U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to obligations arising from the Endangered Species Act as applied to operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbia River and estuary. In fiscal year 2008 (FY08), EOS project accomplishments included (1) subgroup meetings; (2) participation inmore » the estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; (3) project management via BPA's project tracking system, Pisces; (4) quarterly project status reports; and (5) a major revision to the Estuary RME document and its subsequent regional release (new version January 2008). Many of the estuary RME recommendations in this document were incorporated into the Biological Opinion on FCRPS operations (May 2008). In summary, the FY08 EOS project resulted in expanded, substantive coordination with other regional RME forums, a new version of the federal Estuary RME program document, and implementation coordination. This annual report is a FY08 deliverable for the project titled Facilitation of the Estuary/Ocean Subgroup.« less

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Gary E.; Diefenderfer, Heida L.

    The Estuary/Ocean Subgroup (EOS) is part of the research, monitoring, and evaluation (RME) effort that the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to obligations arising from the Endangered Species Act as applied to operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbia River and estuary. In fiscal year 2008 (FY08), EOS project accomplishments included 1) subgroup meetings; 2) participation in themore » estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; 3) project management via the project tracking system, Pisces; 4) quarterly project status reports; and 5) a major revision to the Estuary RME document and its subsequent regional release (new version January 2008). Many of the estuary RME recommendations in this document were incorporated into the Biological Opinion on hydrosystem operations (May 2008). In summary, the FY08 EOS project resulted in expanded, substantive coordination with other regional RME forums, a new version of the federal Estuary RME program document, and implementation coordination. This annual report is a FY08 deliverable for the project titled Facilitation of the Estuary/Ocean Subgroup.« less

  12. Citizen Science for Traffic Planning: A Practical Example

    NASA Astrophysics Data System (ADS)

    Rieke, Matthes; Stasch, Christoph; Autermann, Christian; de Wall, Arne; Remke, Albert; Wulffius, Herwig; Jirka, Simon

    2017-04-01

    Measures affecting traffic flows in urban areas, e.g. changing the configuration of traffic lights, are often causing emotional debates by citizens who are affected by these measures. Up to now, citizens are usually not involved in traffic planning and the evaluation of the decisions that were taken. The enviroCar project provides an open platform for collecting and analyzing car sensor data with GPS position data. On the hardware side, enviroCar relies on using Android smartphones and OBD-II Bluetooth adapters. A Web server component collects and aggregates the readings from the cars, anonymizes them and publishes the data as open data which scientists, public administrations or other third parties can utilize for further analysis. In this work, we provide a general overview on the enviroCar project and present a project in a mid-size city in Germany. The city's administration utilized the enviroCar platform with the help of a traffic system consultancy for including citizens in the evaluation process of different traffic light configurations along major traffic axes. Therefore, a public campaign was started including local workshops to engage the citizens. More than 150 citizens were actively collecting more about 9.500 tracks including about 2.5 million measurements. Dedicated evaluation results for the different traffic axes were computed based on the collected data set. Because the data is publicly available as open data, others may prove and reproduce the evaluation results contributing to an objective discussion of traffic planning measures. In summary, the project illustrates how Citizen Science methods and technologies improve traffic planning and related discussions.

  13. 78 FR 33890 - Limitation on Claims Against Proposed Public Transportation Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-05

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... advising the public of final agency actions subject to Section 139(l) of Title 23, United States Code (U.S...

  14. 78 FR 4191 - Limitation on Claims Against Proposed Public Transportation Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-18

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... advising the public of final agency actions subject to Section 139(l) of Title 23, United States Code (U.S...

  15. 78 FR 16764 - Limitation on Claims Against Proposed Public Transportation Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-18

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... advising the public of final agency actions subject to Section 139(l) of Title 23, United States Code (U.S...

  16. 9 CFR 54.1 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... project. A pilot project authorized by the Administrator in writing, designed to test or improve program... CONTROL AND ERADICATION OF LIVESTOCK OR POULTRY DISEASES CONTROL OF SCRAPIE § 54.1 Definitions. Accredited... by the Administrator in accordance with § 54.11 to conduct one or more scrapie tests, or genotype...

  17. 9 CFR 54.1 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... project. A pilot project authorized by the Administrator in writing, designed to test or improve program... CONTROL AND ERADICATION OF LIVESTOCK OR POULTRY DISEASES CONTROL OF SCRAPIE § 54.1 Definitions. Accredited... by the Administrator in accordance with § 54.11 to conduct one or more scrapie tests, or genotype...

  18. 9 CFR 54.1 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... project. A pilot project authorized by the Administrator in writing, designed to test or improve program... CONTROL AND ERADICATION OF LIVESTOCK OR POULTRY DISEASES CONTROL OF SCRAPIE § 54.1 Definitions. Accredited... by the Administrator in accordance with § 54.11 to conduct one or more scrapie tests, or genotype...

  19. 9 CFR 54.1 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... project. A pilot project authorized by the Administrator in writing, designed to test or improve program... CONTROL AND ERADICATION OF LIVESTOCK OR POULTRY DISEASES CONTROL OF SCRAPIE § 54.1 Definitions. Accredited... by the Administrator in accordance with § 54.11 to conduct one or more scrapie tests, or genotype...

  20. 9 CFR 54.1 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... project. A pilot project authorized by the Administrator in writing, designed to test or improve program... CONTROL AND ERADICATION OF LIVESTOCK OR POULTRY DISEASES CONTROL OF SCRAPIE § 54.1 Definitions. Accredited... by the Administrator in accordance with § 54.11 to conduct one or more scrapie tests, or genotype...

  1. Discretionary Grants Administration Manual.

    ERIC Educational Resources Information Center

    Office of Human Development Services (DHHS), Washington, DC.

    This manual sets forth applicable administrative policies and procedures to recipients of discretionary project grants or cooperative agreements awarded by program offices in the Office of Human Development Services (HDS). It is intended to serve as a basic reference for project directors and business officers of recipient organizations who are…

  2. 76 FR 54730 - Committees on Administration and Management, Collaborative Governance, Judicial Review, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-02

    ... Committees on Administration and Management, Collaborative Governance, Judicial Review, and Regulation ACTION... Governance The Committee on Collaborative Governance will meet to consider two projects. The committee will... FACA committees. The Committee on Collaborative Governance will also discuss a project regarding the...

  3. 76 FR 78732 - FY 2011 Discretionary Funding Opportunity; Section 5309 Bus and Bus Facilities Veterans...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-19

    ... VTCLI supports the Obama Administration's priority of supporting America's veterans and military... Living Initiative Competitive Grant Program Funds: Announcement of Project Selections. SUMMARY: The U.S. Department of Transportation's (DOT) Federal Transit Administration (FTA) announces the selection of projects...

  4. Leadership, Medication Administration, and Knowledge Retention: A Quality Improvement Project

    ERIC Educational Resources Information Center

    Treister, Pamela

    2017-01-01

    A leadership and quality improvement project was undertaken in order to assist undergraduate baccalaureate nursing students in knowledge retention for medication administration during their senior semester in nursing school. Specific changes in curriculum were implemented to assist these undergraduate baccalaureate nursing students at a suburban…

  5. NASA Report to Education, Volume 9

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This is an edition of 'NASA Report to Education' covering NASA's Educational Workshop, Lewis Research Center's T-34 and the Space Exploration Initiative. The first segment shows NASA Education Workshop program (NEWEST - NASA Educational Workshops for Elementary School Teachers). Highlights of the 14 days of intense training, lectures, fieldtrips and simple projects that the educators went through to teach the program are included. Participants are shown working on various projects such as the electromagnetic spectrum, living in Space Station Freedom, experience in T-34, tour of tower at the Federal Aviation Administrative Facilities, conducting an egg survival system and an interactive video conference with astronaut Story Musgrave. Participants share impressions of the workshop. The second segment tells how Lewis Research Center's T-34 aircraft is used to promote aerospace education in several Cleveland schools and excite students.

  6. National Aeronautics and Space Administration (NASA)/American Society for Engineering Education (ASEE) Summer Faculty Fellowship Program, 1987, volume 1

    NASA Technical Reports Server (NTRS)

    Jones, William B. (Editor); Goldstein, Stanley H. (Editor)

    1987-01-01

    The objective of the NASA/ASEE program were: (1) to further the professional knowledge of qualified engineering and science faculty members; (2) to stimulate an exchange of ideas between participants and NASA; (3) to enrich and refresh the research and teaching activities of participants' institutions; and (4) to contribute to the research objectives of the NASA centers. Each faculty fellow spent 10 weeks at Johnson Space Center engaged in a research project commensurate with his/her interests and background and worked in collaboration with a NASA/JSC colleague. A compilation is presented of the final reports on the research projects done by the fellows during the summer of 1987. This is volume 1 of a 2 volume report.

  7. Evaluation of a Tracking System for Patients and Mixed Intravenous Medication Based on RFID Technology.

    PubMed

    Martínez Pérez, María; Vázquez González, Guillermo; Dafonte, Carlos

    2016-11-30

    At present, one of the primary concerns of healthcare professionals is how to increase the safety and quality of the care that patients receive during their stay in hospital. This is particularly important in the administration of expensive and high-risk medicines with which it is fundamental to minimize the possibility of adverse events in the process of prescription-validation-preparation/dosage-dispensation-administration of intravenous mixes. This work is a detailed analysis of the evaluation, carried out by the health personnel involved in the Radiofrequency Identification (RFID) system developed in the Day Hospital and Pharmacy services of the Complejo Hospitalario Universitario A Coruña (CHUAC). The RFID system is evaluated by analyzing surveys completed by said health personnel, since their questions represent the key indicators of the patient care process (safety, cost, adequacy with the clinical practice). This work allows us to conclude, among other things, that the system tracks the patients satisfactorily and that its cost, though high, is justified in the context of the project context (use of dangerous and costly medication).

  8. Evaluation of a Tracking System for Patients and Mixed Intravenous Medication Based on RFID Technology

    PubMed Central

    Martínez Pérez, María; Vázquez González, Guillermo; Dafonte, Carlos

    2016-01-01

    At present, one of the primary concerns of healthcare professionals is how to increase the safety and quality of the care that patients receive during their stay in hospital. This is particularly important in the administration of expensive and high-risk medicines with which it is fundamental to minimize the possibility of adverse events in the process of prescription-validation-preparation/dosage-dispensation-administration of intravenous mixes. This work is a detailed analysis of the evaluation, carried out by the health personnel involved in the Radiofrequency Identification (RFID) system developed in the Day Hospital and Pharmacy services of the Complejo Hospitalario Universitario A Coruña (CHUAC). The RFID system is evaluated by analyzing surveys completed by said health personnel, since their questions represent the key indicators of the patient care process (safety, cost, adequacy with the clinical practice). This work allows us to conclude, among other things, that the system tracks the patients satisfactorily and that its cost, though high, is justified in the context of the project context (use of dangerous and costly medication). PMID:27916915

  9. Study on recent execution of overall evaluation bidding method in small and medium-sized regional local governments

    NASA Astrophysics Data System (ADS)

    Fujishima, Hirohide; Yanase, Norihiko

    About 70% of local governments in Japan, endeavored to introduce overall evaluation bidding method for their public works in 2011 and each authority ordered one or some projects in according to the new bidding process. That is, their enforcement was an only trial level and they say that the reason why is long-term procedure and heavily administrative load of the system. The author think that such burden has relationship of human affairs of local govern ments, practical problems on kinds and price of constructions and the officers' experience on the new bidding method. The aim of this study is to analyze such problems among the officers' profession, posts and experience of administrative matter by statistical data, questionnaire and hearing to the officers. The result could indicate that a group of small local governments uses the method appropriately and that another group of medium-sized rejects to increase more contracts in according to the new bidding system because of unbalance between the stuffs' ability and order quantity of public works.

  10. Environmental Management and the New Politics of Western Water: The Animas-La Plata Project and Implementation of the Endangered Species Act.

    PubMed

    ELLISON

    1999-05-01

    / This paper explores the new politics of western water policy through an examination of the Animas-La Plata water project and implementation of the Endangered Species Act. It is suggested that the focus of western water programming has shifted from the source of distributed funds, the United States Congress, to the agencies originally created to deliver federal benefits because funding for new project construction has not been forthcoming. Under this new system, members of Congress continue to excite their constituents with promises of money for new project starts, while the administrative agencies perform the myriad duties needed to keep these projects alive. The result is that political objectives have replaced operational/management objectives in administrative processes. In this case, the author demonstrates how resource managers in the Bureau of Reclamation manipulated hydrological analysis to control administrative process, why their manipulation was unfair, and perhaps illegal, and why biologists from the US Fish and Wildlife Service accepted the analysis. While ostensibly protecting all interests, the result is that none of the objectives of federal water programming are achieved. KEY WORDS: Environmental management; Administrative politics; Water policy; Endangered Species Act; Animas-La Plata, Bureau of Reclamation

  11. National Aeronautics and Space Administration (NASA)/American Society of Engineering Education (ASEE) Summer Faculty Fellowship Program - 2000

    NASA Technical Reports Server (NTRS)

    Bannerot, Richard B. (Editor); Sickorez, Donn G. (Editor)

    2003-01-01

    The 2000 Johnson Space Center (JSC) National Aeronautics and Space Administration (NASA)/American Society for Engineering Education (ASEE) Summer Faculty Fellowship Program was conducted by the University of Houston and JSC. The 10-week program was operated under the auspices of the ASEE. The program at JSC, as well as the programs at other NASA Centers, was funded by the Office of University Affairs, NASA Headquarters, Washington, D.C. The objectives of the program, which began in 1965 at JSC and 1964 nationally, are to (1) further the professional knowledge of qualified engineering and science faculty, (2) stimulate an exchange of ideas between participants and NASA, (3) enrich and refresh the research and teaching activities of participants' institutions, and (4) contribute to the research objectives of the NASA Centers. Each faculty fellow spent at least 10 weeks at JSC engaged in a research project commensurate with her/his interests and background, and worked in collabroation with a NASA/JSC colleague. This document is a compilation of the final reports on the research projects done by the faculty fellows during the summer of 2000.

  12. Projected Impact of Compositional Verification on Current and Future Aviation Safety Risk

    NASA Technical Reports Server (NTRS)

    Reveley, Mary S.; Withrow, Colleen A.; Leone, Karen M.; Jones, Sharon M.

    2014-01-01

    The projected impact of compositional verification research conducted by the National Aeronautic and Space Administration System-Wide Safety and Assurance Technologies on aviation safety risk was assessed. Software and compositional verification was described. Traditional verification techniques have two major problems: testing at the prototype stage where error discovery can be quite costly and the inability to test for all potential interactions leaving some errors undetected until used by the end user. Increasingly complex and nondeterministic aviation systems are becoming too large for these tools to check and verify. Compositional verification is a "divide and conquer" solution to addressing increasingly larger and more complex systems. A review of compositional verification research being conducted by academia, industry, and Government agencies is provided. Forty-four aviation safety risks in the Biennial NextGen Safety Issues Survey were identified that could be impacted by compositional verification and grouped into five categories: automation design; system complexity; software, flight control, or equipment failure or malfunction; new technology or operations; and verification and validation. One capability, 1 research action, 5 operational improvements, and 13 enablers within the Federal Aviation Administration Joint Planning and Development Office Integrated Work Plan that could be addressed by compositional verification were identified.

  13. Building CHAOS: An Operating System for Livermore Linux Clusters

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Garlick, J E; Dunlap, C M

    2003-02-21

    The Livermore Computing (LC) Linux Integration and Development Project (the Linux Project) produces and supports the Clustered High Availability Operating System (CHAOS), a cluster operating environment based on Red Hat Linux. Each CHAOS release begins with a set of requirements and ends with a formally tested, packaged, and documented release suitable for use on LC's production Linux clusters. One characteristic of CHAOS is that component software packages come from different sources under varying degrees of project control. Some are developed by the Linux Project, some are developed by other LC projects, some are external open source projects, and some aremore » commercial software packages. A challenge to the Linux Project is to adhere to release schedules and testing disciplines in a diverse, highly decentralized development environment. Communication channels are maintained for externally developed packages in order to obtain support, influence development decisions, and coordinate/understand release schedules. The Linux Project embraces open source by releasing locally developed packages under open source license, by collaborating with open source projects where mutually beneficial, and by preferring open source over proprietary software. Project members generally use open source development tools. The Linux Project requires system administrators and developers to work together to resolve problems that arise in production. This tight coupling of production and development is a key strategy for making a product that directly addresses LC's production requirements. It is another challenge to balance support and development activities in such a way that one does not overwhelm the other.« less

  14. 23 CFR 810.302 - Eligible projects.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PUBLIC TRANSPORTATION MASS TRANSIT AND SPECIAL USE HIGHWAY PROJECTS Federal-Aid Urban System Nonhighway Public Mass Transit Projects § 810.302 Eligible projects. (a) Eligible projects are those defined as nonhighway public mass transit projects in...

  15. 49 CFR 633.11 - Covered projects.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.11 Covered projects. The Administrator may contract for project management oversight services when the... 49 Transportation 7 2010-10-01 2010-10-01 false Covered projects. 633.11 Section 633.11...

  16. 49 CFR 633.11 - Covered projects.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.11 Covered projects. The Administrator may contract for project management oversight services when the... 49 Transportation 7 2012-10-01 2012-10-01 false Covered projects. 633.11 Section 633.11...

  17. 49 CFR 633.11 - Covered projects.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.11 Covered projects. The Administrator may contract for project management oversight services when the... 49 Transportation 7 2013-10-01 2013-10-01 false Covered projects. 633.11 Section 633.11...

  18. 49 CFR 633.11 - Covered projects.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.11 Covered projects. The Administrator may contract for project management oversight services when the... 49 Transportation 7 2014-10-01 2014-10-01 false Covered projects. 633.11 Section 633.11...

  19. 49 CFR 633.11 - Covered projects.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.11 Covered projects. The Administrator may contract for project management oversight services when the... 49 Transportation 7 2011-10-01 2011-10-01 false Covered projects. 633.11 Section 633.11...

  20. Cultural Resources Survey at Historical Kaskaskia and Selected Portions of the Upper Mississippi River Shoreline from Miles 115.9 to 272.9, Illinois and Missouri.

    DTIC Science & Technology

    1985-04-01

    Resources Group, Ltd. AREA & WORK UNIT NUMBERS 127 N. Washington Avenue Carbondale, Illinois 62901 11. CONTROLLING OFFICE NAME AND ADDRESS 12. REPORT...Ice President, and Mr. Keith Govro, Head, Ecology Department, provided assistance in the areas of project administration and fileld logistics. - The... area w as pr ov Ided by Mr. Her b Mey er, U niv er sity Photocomm un Icat Ion s, Southern Ill inois University. Mr. Meyer also contributed results of

  1. Earth Science Applications Showcase

    NASA Image and Video Library

    2014-08-05

    NASA Administrator Charles Bolden speaks with young professionals about their project on New England water resources during the annual DEVELOP Earth Science Application Showcase at NASA headquarters Tuesday, August 5, 2014. The Earth Science Applications Showcase highlights the work of over 150 participants in the 10-week DEVELOP program that started in June. The DEVELOP Program bridges the gap between NASA Earth science and society, building capacity in both its participants and partner organizations, to better prepare them to handle the challenges that face our society and future generations. Photo Credit: (NASA/Aubrey Gemignani)

  2. Earth Science Applications Showcase

    NASA Image and Video Library

    2014-08-05

    NASA Administrator Charles Bolden asks young professionals about their projects after posing for a group photo during the annual DEVELOP Earth Science Application Showcase at NASA headquarters Tuesday, August 5, 2014. The Earth Science Applications Showcase highlights the work of over 150 participants in the 10-week DEVELOP program that started in June. The DEVELOP Program bridges the gap between NASA Earth science and society, building capacity in both its participants and partner organizations, to better prepare them to handle the challenges that face our society and future generations. Photo Credit: (NASA/Aubrey Gemignani)

  3. A Risk Communication Success Story

    NASA Technical Reports Server (NTRS)

    Peecook, Keith

    2010-01-01

    A key success of the decommissioning effort at the National Aeronautics and Space Administration's (NASA's) Plum Brook Reactor Facility (PBRF) has been the public outreach program. The approach has been based on risk communications rather than a public relations approach. As a result it has kept the public feeling more involved in the process. It ensures they have the information needed to understand the project and its goals, and to make recommendations. All this is done so that NASA can better plan and execute the necessary work without delays or suprises.

  4. 77 FR 26275 - Bonneville Power Administration; Montana-to-Washington Transmission System Upgrade Project EIS

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-03

    ... Upgrade Project EIS AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION... involvement. SUMMARY: BPA intends to prepare an EIS in accordance with the National Environmental Policy Act... consist of a combination of reinforcements of five existing BPA substations, placement of new conductor on...

  5. 75 FR 36150 - Notice of Final Federal Agency Action on Proposed Transportation Project in Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-24

    ... licenses, permits, and approvals for the highway and transit project. Tier 1 decisions also may be relied... Administrator, Federal Highway Administration, 3250 Executive Park Drive, Springfield, Illinois 62703, Phone... eliminated from further consideration and study, including but not limited to, the No-Action Alternative...

  6. 36 CFR 218.5 - Giving notice of proposed authorized hazardous fuel reduction projects subject to objection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE PREDECISIONAL ADMINISTRATIVE REVIEW PROCESSES Predecisional Administrative Review Process for Hazardous Fuel Reduction Projects Authorized by the Healthy... subject to the objection process pursuant to 36 CFR part 218, subpart A, and include the following: (i...

  7. The Computerized Adaptive Testing System Development Project.

    ERIC Educational Resources Information Center

    McBride, James R.; Sympson, J. B.

    The Computerized Adaptive Testing (CAT) project is a joint Armed Services coordinated effort to develop and evaluate a system for automated, adaptive administration of the Armed Services Vocational Aptitude Battery (ASVAB). The CAT is a system for administering personnel tests that differs from conventional test administration in two major…

  8. 34 CFR 75.701 - The grantee administers or supervises the project.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 1 2014-07-01 2014-07-01 false The grantee administers or supervises the project. 75.701 Section 75.701 Education Office of the Secretary, Department of Education DIRECT GRANT PROGRAMS What Are the Administrative Responsibilities of a Grantee? General Administrative Responsibilities § 75...

  9. The Midwest State Archives Guide Project: Collateral Reports.

    ERIC Educational Resources Information Center

    Evans, Max J.; And Others

    This document comprises four reports related to the Midwest State Archives Guide Project. The first report, "Producing In-House Finding Aids and Administrative Reports: An Expanded Data Base Design," details an expanded SPINDEX database design that could be used to produce a variety of administrative reports. Specific examples are given…

  10. Bangladesh Agro-Climatic Environmental Monitoring Project

    NASA Technical Reports Server (NTRS)

    Vermillion, C.; Maurer, H.; Williams, M.; Kamowski, J.; Moore, T.; Maksimovich, W.; Obler, H.; Gilbert, E.

    1988-01-01

    The Agro-Climatic Environmental Monitoring Project (ACEMP) is based on a Participating Agency Service Agreement (PASA) between the Agency for International Development (AID) and the National Oceanic and Atmospheric Administration (NOAA). In FY80, the Asia Bureau and Office of Federal Disaster Assistance (OFDA), worked closely to develop a funding mechanism which would meet Bangladesh's needs both for flood and cyclone warning capability and for application of remote sensing data to development problems. In FY90, OFDA provided for a High Resolution Picture Transmission (HRPT) receiving capability to improve their forecasting accuracy for cyclones, flooding and storm surges. That equipment is primarily intended as a disaster prediction and preparedness measure. The ACEM Project was designed to focus on the development applications of remote sensing technology. Through this Project, AID provided to the Bangladesh Government (BDG) the equipment, technical assistance, and training necessary to collect and employ remote sensing data made available by satellites as well as hydrological data obtained from data collection platforms placed in major rivers. The data collected will enable the BDG to improve the management of its natural resources.

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Green, D.W.; Heinrich, R.R.; Jensen, K.J.

    Technical and administrative activities of the Analytical Chemistry Laboratory (ACL) are reported for fiscal year 1984. The ACL is a full-cost-recovery service center, with the primary mission of providing a broad range of technical support services to the scientific and engineering programs at ANL. In addition, ACL conducts a research program in analytical chemistry, works on instrumental and methods development, and provides analytical services for governmental, educational, and industrial organizations. The ACL is administratively within the Chemical Technology Division, the principal user, but provides technical support for all of the technical divisions and programs at ANL. The ACL has threemore » technical groups - Chemical Analysis, Instrumental Analysis, and Organic Analysis. Under technical activities 26 projects are briefly described. Under professional activities, a list is presented for publications and reports, oral presentations, awards and meetings attended. 6 figs., 2 tabs.« less

  12. Diagnostic guidelines for newborns who screen positive in newborn screening.

    PubMed

    Kronn, David; Mofidi, Shideh; Braverman, Nancy; Harris, Katharine

    2010-12-01

    Recent expansion of the newborn screening panels has presented an interesting challenge to specialty care centers, especially the clinical genetics community. Some of the conditions in the core and secondary newborn screening panels have extremely variable clinical presentations; others are so rare that only a handful of newborns have been diagnosed with them to date (Region 4 Collaborative MS/MS project-http://region4genetics.org/msms_data_project/data_project_home.aspx). Definition of some disorders is problematic-does continued abnormality of the screening analyte constitute diagnosis or is further testing necessary? A work group of the New York Mid-Atlantic Consortium for Genetic and Newborn Screening Services (region 2), one of seven regional collaboratives funded by the Federal Health Resources and Services Administration and administered by the Maternal and Child Health Bureau (U22MC03956), has developed guidelines for the confirmation of diagnosis of the conditions in the newborn screening panels for use by the specialty care centers. The diagnostic guidelines are a work in progress and are being reviewed and revised regularly as our understanding of the newborn screened disorders improves. The aim is to make it a relevant guide for specialty care physicians and other healthcare professionals in the diagnostic workup of these patients.

  13. 49 CFR 501.8 - Delegations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Applied Research. The Senior Associate Administrator for Vehicle Safety exercises executive direction with... Administrator for Advanced Research and Analysis; the Associate Administrator for Administration; the Associate... research and development programs and projects necessary to support the purposes of Chapters 301, 323, 325...

  14. 36 CFR 218.1 - Purpose and scope.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ADMINISTRATIVE REVIEW PROCESSES Predecisional Administrative Review Process for Hazardous Fuel Reduction Projects... a predecisional administrative review (hereinafter referred to as “objection”) process for proposed...). The objection process is the sole means by which administrative review of a proposed authorized...

  15. 49 CFR 633.5 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT General Provisions § 633.5 Definitions. As used in this part... construction and management of a project. Major capital project means a project that: (1) Involves the...; or (3) The Administrator determines is a major capital project because the project management...

  16. 49 CFR 633.5 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT General Provisions § 633.5 Definitions. As used in this part... construction and management of a project. Major capital project means a project that: (1) Involves the...; or (3) The Administrator determines is a major capital project because the project management...

  17. 49 CFR 633.5 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT General Provisions § 633.5 Definitions. As used in this part... construction and management of a project. Major capital project means a project that: (1) Involves the...; or (3) The Administrator determines is a major capital project because the project management...

  18. 49 CFR 633.5 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT General Provisions § 633.5 Definitions. As used in this part... construction and management of a project. Major capital project means a project that: (1) Involves the...; or (3) The Administrator determines is a major capital project because the project management...

  19. 49 CFR 633.5 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT General Provisions § 633.5 Definitions. As used in this part... construction and management of a project. Major capital project means a project that: (1) Involves the...; or (3) The Administrator determines is a major capital project because the project management...

  20. Perspectives: Using Results from HRSA's Health Workforce Simulation Model to Examine the Geography of Primary Care.

    PubMed

    Streeter, Robin A; Zangaro, George A; Chattopadhyay, Arpita

    2017-02-01

    Inform health planning and policy discussions by describing Health Resources and Services Administration's (HRSA's) Health Workforce Simulation Model (HWSM) and examining the HWSM's 2025 supply and demand projections for primary care physicians, nurse practitioners (NPs), and physician assistants (PAs). HRSA's recently published projections for primary care providers derive from an integrated microsimulation model that estimates health workforce supply and demand at national, regional, and state levels. Thirty-seven states are projected to have shortages of primary care physicians in 2025, and nine states are projected to have shortages of both primary care physicians and PAs. While no state is projected to have a 2025 shortage of primary care NPs, many states are expected to have only a small surplus. Primary care physician shortages are projected for all parts of the United States, while primary care PA shortages are generally confined to Midwestern and Southern states. No state is projected to have shortages of all three provider types. Projected shortages must be considered in the context of baseline assumptions regarding current supply, demand, provider-service ratios, and other factors. Still, these findings suggest geographies with possible primary care workforce shortages in 2025 and offer opportunities for targeting efforts to enhance workforce flexibility. © Published 2017. This article is a U.S. Government work and is in the public domain in the USA.

  1. An Effective Health and Medical Technical Authority

    NASA Technical Reports Server (NTRS)

    Fogarty, Jennifer A.

    2009-01-01

    The NASA Governance model directed the formation of three Technical Authorities, Engineering; Safety and Mission Assurance; and Health and Medical, to ensure that risks are identified and adjudicated efficiently and transparently in concert with the spaceflight programs and projects. The Health and Medical Technical Authority (HMTA) has been implemented at the Johnson Space Center (JSC) and consists of the Chief Medical Office (CMO), the Deputy CMO, and HMTA Delegates. The JSC HMTA achieves the goals of risk identification and adjudication through the discharge of the appropriate technical expertise to human space flight programs and projects and the escalation of issues within program and technical authority boards. The JSC HMTA relies on subject matter experts (SMEs) in the Space Life Sciences Directorate at JSC as well as experts from other Centers to work crew health and performance issues at the technical level, develop requirements, oversee implementation and validation of requirements, and identify risks and non-compliances. Once a risk or potential noncompliance has been identified and reported to the programs or projects, the JSC HMTA begins to track it and closely monitor the program's or project's response. As a risk is developed or a non-compliance negotiated, positions from various levels of decision makers are sought at the program and project control boards. The HMTA may support a program or project position if it is satisfied with the decision making and vetting processes (ex. the subject matter expert voiced his/her concerns and all dissenting opinions were documented) and finds that the position both acknowledges the risk and cost of the mitigation and resolves the issue without changing NASA risk posture. The HMTA may disagree with a program or project position if the NASA risk posture has been elevated or obfuscated. If the HMTA does disagree with the program or project position, it will appeal to successively higher levels of authority so that risk acceptance and risk trades will be acknowledged and sanctioned at the highest appropriate level; this includes Program Managers, Mission Directorate Associate Administrators and the Agency Administrator.

  2. 28 CFR 551.60 - Volunteer community service projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MANAGEMENT MISCELLANEOUS Volunteer Community Service Projects § 551.60 Volunteer community service projects. (a) A volunteer community service project is a project sponsored and developed by local government or... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Volunteer community service projects. 551...

  3. 28 CFR 551.60 - Volunteer community service projects.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Volunteer community service projects. 551... MANAGEMENT MISCELLANEOUS Volunteer Community Service Projects § 551.60 Volunteer community service projects. (a) A volunteer community service project is a project sponsored and developed by local government or...

  4. 28 CFR 551.60 - Volunteer community service projects.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Volunteer community service projects. 551... MANAGEMENT MISCELLANEOUS Volunteer Community Service Projects § 551.60 Volunteer community service projects. (a) A volunteer community service project is a project sponsored and developed by local government or...

  5. 28 CFR 551.60 - Volunteer community service projects.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 2 2011-07-01 2011-07-01 false Volunteer community service projects. 551... MANAGEMENT MISCELLANEOUS Volunteer Community Service Projects § 551.60 Volunteer community service projects. (a) A volunteer community service project is a project sponsored and developed by local government or...

  6. 28 CFR 551.60 - Volunteer community service projects.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Volunteer community service projects. 551... MANAGEMENT MISCELLANEOUS Volunteer Community Service Projects § 551.60 Volunteer community service projects. (a) A volunteer community service project is a project sponsored and developed by local government or...

  7. Quarterly Progress Report (January 1 to March 31, 1950)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brookhaven National Laboratory

    This is the first of a series of Quarterly Reports. These reports will deal primarily with the progress made in our scientific program during a three months period. Those interested in matters pertaining to organization, administration, complete scientific program, personnel and other matters not directly involved in current scientific progress are referred to our Annual Progress Report which is issued in January. We have attempted to describe new information that appears significant, or of interest, to other scientists within the Atomic Energy Commission Laboratories. No effort has been made, however, to detail progress in each and every research project. Littlemore » or no reference will therefore be found to the projects in which progress during the current period is considered too inconclusive. Since our organizational structure is departmental, the work described herein is arranged in the following sequence: (1) Accelerator Project; (2) Biology Department; (3) Chemistry Department; (4) Instrumentation and Health Physic8 Department; (5) Medical Department; (6) Physics Department; and (7) Reactor Science and Engineering Department.« less

  8. King County Metro Battery Electric Bus Demonstration: Preliminary Project Results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    The U.S. Federal Transit Administration (FTA) funds a variety of research projects that support the commercialization of zero-emission bus technology. To evaluate projects funded through these programs, FTA has enlisted the help of the National Renewable Energy Laboratory (NREL) to conduct third-party evaluations of the technologies deployed under the FTA programs. NREL works with the selected agencies to evaluate the performance of the zero-emission buses compared to baseline conventional buses in similar service. The evaluation effort will advance the knowledge base of zero-emission technologies in transit bus applications and provide 'lessons learned' to aid other fleets in incrementally introducing nextmore » generation zero-emission buses into their operations. This report provides preliminary performance evaluation results from a demonstration of three zero-emission battery electric buses at King County Metro in King County, Washington. NREL developed this preliminary results report to quickly disseminate evaluation results to stakeholders. Detailed evaluation results will be published in future reports.« less

  9. Evaluating the completeness of the national ALS registry, United States.

    PubMed

    Kaye, Wendy E; Wagner, Laurie; Wu, Ruoming; Mehta, Paul

    2018-02-01

    Our objective was to evaluate the completeness of the United States National ALS Registry (Registry). We compared persons with ALS who were passively identified by the Registry with those actively identified in the State and Metropolitan Area ALS Surveillance project. Cases in the two projects were matched using a combination of identifiers, including, partial social security number, name, date of birth, and sex. The distributions of cases from the two projects that matched/did not match were compared and Chi-square tests conducted to determine statistical significance. There were 5883 ALS cases identified by the surveillance project. Of these, 1116 died before the Registry started, leaving 4767 cases. We matched 2720 cases from the surveillance project to those in the Registry. The cases identified by the surveillance project that did not match cases in the Registry were more likely to be non-white, Hispanic, less than 65 years of age, and from western states. The methods used by the Registry to identify ALS cases, i.e. national administrative data and self-registration, worked well but missed cases. These findings suggest that developing strategies to identify and promote the Registry to those who were more likely to be missing, e.g. non-white and Hispanic, could be beneficial to improving the completeness of the Registry.

  10. 75 FR 53701 - Clinical Studies of Safety and Effectiveness of Orphan Products Research Project Grant (R01...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-01

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2010-N-0394] Clinical Studies of Safety and Effectiveness of Orphan Products Research Project Grant (R01); Correction AGENCY: Food and Drug Administration, HHS. ACTION: Notice; correction. SUMMARY: The Food and Drug...

  11. 43 CFR 404.51 - Are proposed projects under the Rural Water Supply Program reviewed by the Administration?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Water Supply Program reviewed by the Administration? 404.51 Section 404.51 Public Lands: Interior... SUPPLY PROGRAM Feasibility Studies § 404.51 Are proposed projects under the Rural Water Supply Program... the Reclamation's Rural Water Supply Program. This includes review under Executive Order 12322 to...

  12. Administrative Aspects of Third World Library Development: The Five "Pillars" of Sustainable Information Transfer.

    ERIC Educational Resources Information Center

    Emerson, Susan Vince; And Others

    Third World libraries, as a rule, receive information technology, technical assistance, and training as part of international development projects. Library improvements and their intended objective, information transfer, are more effective and lasting if key administrative and policy issues are addressed by the projects. Critical success factors…

  13. Health Care Administrators. Project TEAMS. (Techniques and Education for Achieving Management Skills).

    ERIC Educational Resources Information Center

    Platte Technical Community Coll., Columbus, NE.

    The result of a project to develop short courses to help health care administrators and supervisors in developing practical, up-to-date management skills, this instructional workbook provides information and exercises applicable to on-the-job situations. Unit I covers the following leadership considerations: self-awareness, time management,…

  14. Using the Virtual Vee Map for Inquiry with Geoscience Research Data

    NASA Astrophysics Data System (ADS)

    Rutherford, S.

    2009-04-01

    The Vee Map is a method by which any teacher can implement guided inquiry in their classroom. It was originally designed to work with classic laboratories. However, Coffman and Riggs (2006) used the idea so that students could gather online scientific data to answer a research question. This is known as the "Virtual Vee Map" because the scientific data collected is online or virtual. Students have great difficulty with designing and conducting a research project. They also are not able to work with scientific data. Many organizations are now making their scientific data available for use by the educational community. However, many educators and students have found geoscience data difficult to find and use. Ledley et al. (2008) suggests that organizations use educationally relevant review criteria for their data sites. As part of a National Oceanic and Atmosphere Administration (NOAA) research project, a website was developed using the Great Lakes Environmental Research Laboratory's (GLERL) scientific data about the Great Lakes. This data was made available such that pre-service Earth Science elementary teachers could design a research question for use with the Virtual Vee Map's guided inquiry approach.

  15. Denver airport pumping systems achieve optimal [Delta] T's

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mannion, G.F.; Krist, G.D.

    1994-07-01

    This article describes how the pumping and generating systems at the new Denver Airport operate efficiently with the user loops in the buildings producing design temperature rise at all load levels. Fifteen miles east of Denver's Stapleton International Airport lies the newly completed Denver International Airport (DIA)--the world's largest and most high-tech airport. Besides being one of the largest construction projects in the works, it has many of the latest technical innovations available. Of particular interest to the HVAC industry is the design of the heating and cooling water systems. These systems provide environmental cooling and heating water to themore » three concourses, the airport office building, and the main terminal. The mechanical engineers for the project were all from the Denver area. The central plant design was the work of Behrent Engineering Co.; the three concourses were designed by Swanson-Rink Associates; and the main terminal and administrative office building were designed by Abeyta Engineering Consultants. The overall system concept was developed during the initial design phase by engineers from these firms, members of the DIA staff, and application engineers from several manufacturers.« less

  16. 25 CFR 900.113 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... contract. This does not involve construction project management as defined in paragraph (d) of this section...) Construction project management means direct responsibility for the construction project through day-to-day on-site management and administration of the project. Activities may include cost management, project...

  17. 5 CFR 470.305 - Submission of proposals for demonstration projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... projects. 470.305 Section 470.305 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration Projects § 470.305 Submission of proposals for demonstration projects. (a) OPM...

  18. 23 CFR 505.5 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION TRANSPORTATION INFRASTRUCTURE MANAGEMENT PROJECTS OF... efficient management of the project in accordance with applicable Federal statutes, regulations, and policy... of State Transportation Departments, with one State acting as the project lead. Eligible project...

  19. The art of improvisation: the working process of administrators at a Federal University Hospital.

    PubMed

    Littike, Denilda; Sodré, Francis

    2015-10-01

    The scope of this article is to analyze the working process of administrators at a Federal University Hospital (HUF). It includes research with a qualitative approach conducted through interviews with twelve administrators. The work process, the work tools and the human activity per se are understood to be under scrutiny. Work is acknowledged as a category that analyzes the management methods used by professional health workers. The HUFs are responsible for two social policies, namely education and health. The aim of the administrators' work is an organizational issue, and the administration tools used are bureaucratic and out-of-date for the current political context of hospital management. The most significant feature of this hospital administration is improvisation, which reduces the potential of the administrators in such a way that, instead of introducing innovative changes into their work process, they prefer to leave their jobs. Improvisation is caused by the production of sequential obstacles in management decision-making at this teaching hospital. In short, the transfer of administration at the HUF, from direct government administration by the University to the Brazilian Company of Hospital Services (EBSERH), was analyzed on the grounds that this would establish a "new" management model.

  20. Clackamas/Hood River Habitat Enhancement Program, 1987 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MacDonald, Ken; Cain, Thomas C.; Heller, David A.

    1988-03-01

    Fisheries habitat improvement work is being done on priority drainages in the Clackamas and Rood River sub-basins under program measure 704(c), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program. This report describes the work completed in 1987 for Bonneville Power Administration (BPA) project number 84-11, the Clackamas/Hood River Habitat Enhancement Program. The program is composed of six projects: Collawash River Habitat Improvement Project; Collawash River Falls Passage Improvement Project, Oak Grove Fork Habitat Improvement Project; Lake Branch/West Fork Hood River Habitat Improvement Project; Fifteenmile Creek Habitat Improvement Project; and Abundance, Behavior, andmore » Habitat Utilization by Coho Salmon and Steelhead Trout in Fish Creek, Oregon, As Influenced by Habitat Enhancement. This ongoing program was initiated in 1984, although some of the projects were begun with BPA funding support as early as 1983. The projects are complemented by a variety of habitat improvement and management activities funded from a variety of Forest Service sources. This report describes the activities implemented for five of the six projects. A separate annual report on the 1987 habitat improvement and monitoring/evaluation efforts in the Fish Creek drainage has been prepared. Species for management emphasis include spring chinook and coho salmon, and summer and winter steelhead trout. Project work in 1987 primarily focused on increasing the quantity and quality of available rearing habitat, and improving access at passage barriers. The underlying theme of the improvement work has been to increase habitat diversity through the introduction of ''structure''. Structure provided by logs and boulders serves to deflect, pond, or otherwise disrupt flow patterns within a stream channel. This alteration of flow patterns results in formation of an increased number of habitat niches (i.e. pools, glides, alcoves, etc. ) in which a variety of species and age group: of salmon and trout can rear. It also results in the sorting of gravel, rubble, and boulders being transported downstream, creating high quality spawning and rearing habitats, and food producing areas. In 1987, a total of 11.0 miles of stream were treated; 334 log structures (Including: ''deflector'', ''digger'', ''sill'', and ''cover'' logs) and 141 boulder structures (including: single boulder placement, ''berms'', ''alcoves'', and ''clusters'') were completed to meet habitat improvement objectives. In addition to these direct habitat improvement activities, BPA and the Forest Service financed a number of project and program assessment activities that have improved the efficiency and effectiveness of the Forest's fisheries management program. Notable findings relate to the durability of habitat improvement structures, the associated changes in physical habitat, and biological response to the improvement activities. A discussion of the 1987 habitat monitoring and evaluation program results can be found in the supplemental document, Appendix: Monitoring and Evaluation of Mt. Hood National Forest Stream Habitat Improvement and Rehabilitation Projects: 1987 Annual Report (Forsgren, Heller, and Ober, 1988).« less

  1. Control and Non-Payload Communications (CNPC) Prototype Radio - Generation 2 Security Flight Test Report

    NASA Technical Reports Server (NTRS)

    Iannicca, Dennis C.; Ishac, Joseph A.; Shalkhauser, Kurt A.

    2015-01-01

    NASA Glenn Research Center (GRC), in cooperation with Rockwell Collins, is working to develop a prototype Control and Non-Payload Communications (CNPC) radio platform as part of NASA Integrated Systems Research Program's (ISRP) Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) project. A primary focus of the project is to work with the Federal Aviation Administration (FAA) and industry standards bodies to build and demonstrate a safe, secure, and efficient CNPC architecture that can be used by industry to evaluate the feasibility of deploying a system using these technologies in an operational capacity. GRC has been working in conjunction with these groups to assess threats, identify security requirements, and to develop a system of standards-based security controls that can be applied to the GRC prototype CNPC architecture as a demonstration platform. The proposed security controls were integrated into the GRC flight test system aboard our S-3B Viking surrogate aircraft and several network tests were conducted during a flight on November 15th, 2014 to determine whether the controls were working properly within the flight environment. The flight test was also the first to integrate Robust Header Compression (ROHC) as a means of reducing the additional overhead introduced by the security controls and Mobile IPv6. The effort demonstrated the complete end-to-end secure CNPC link in a relevant flight environment.

  2. Social Work Values in Human Services Administration: Implications for Social Work Education

    ERIC Educational Resources Information Center

    Watson, Larry D.; Hoefer, Richard

    2014-01-01

    The perceived wisdom in the social work education community, based on empirical research from the 1990s and the early part of this century, says that the master of social work (MSW) degree is not competitive with the master of business administration or the master of public administration to obtain top-level administration jobs in nonprofit…

  3. The Joy of Social Work Administration: An Exploratory Qualitative Study of Human Service Administrators' Positive Perceptions of Their Work

    ERIC Educational Resources Information Center

    Watson, Larry D.; Hoefer, Richard A.

    2016-01-01

    Positive organizational psychology suggests that researchers should focus on the rewarding elements of work life, yet those in the fields of social work and nonprofit administration have not conducted research in line with this admonition. Indeed, the current focus on administrative challenges and problems may be part of the reason there is…

  4. 23 CFR 810.304 - Submission of projects.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PUBLIC TRANSPORTATION MASS TRANSIT AND SPECIAL USE HIGHWAY PROJECTS Federal-Aid Urban System Nonhighway Public Mass Transit Projects § 810.304 Submission of projects. (a) An application for an urban system nonhighway public mass transit project shall...

  5. 23 CFR 810.304 - Submission of projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PUBLIC TRANSPORTATION MASS TRANSIT AND SPECIAL USE HIGHWAY PROJECTS Federal-Aid Urban System Nonhighway Public Mass Transit Projects § 810.304 Submission of projects. (a) An application for an urban system nonhighway public mass transit project shall...

  6. 5 CFR 470.317 - Project evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 5 Administrative Personnel 1 2014-01-01 2014-01-01 false Project evaluation. 470.317 Section 470... MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration Projects § 470.317 Project evaluation. (a) Compliance evaluation. OPM will review the operation of the...

  7. 5 CFR 470.317 - Project evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 5 Administrative Personnel 1 2012-01-01 2012-01-01 false Project evaluation. 470.317 Section 470... MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration Projects § 470.317 Project evaluation. (a) Compliance evaluation. OPM will review the operation of the...

  8. Grande Ronde Basin Fish Habitat Enhancement Project, Annual Report 2002-2003.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McGowan, Vance

    On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an agreement to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In July of 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the intergovernmental contract, and on March 1, 1996 the Wallowa River subbasin was added. The primary goal of 'The Grande Ronde Basin Fish Habitat Enhancement Project' is to create, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing opportunitiesmore » for natural fish production within the basin. This project provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife is on private lands and therefore requires that considerable time be spent developing rapport with landowners to gain acceptance of, and continued cooperation with this program throughout 10-15 year lease periods. This project calls for passive regeneration of habitat, using riparian exclosure fencing as the primary method to restore degraded streams to a normative condition. Active remediation techniques using plantings, off-site water developments, site-specific instream structures, or whole channel alterations are also utilized where applicable. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and local watershed councils. Work undertaken during 2002 included: (1) Implementing 1 new fencing project in the Wallowa subbasin that will protect an additional 0.95 miles of stream and 22.9 acres of habitat; (2) Conducting instream work activities in 3 streams to enhance habitat and/or restore natural channel dimensions, patterns or profiles; (3) Planting 31,733 plants along 3.7 stream miles, (4) Establishing 71 new photopoints and retaking 254 existing photopoint pictures; (5) Monitoring stream temperatures at 12 locations on 6 streams; (6) Completing riparian fence, water gap and other maintenance on 100.5 miles of project fences. Since initiation of the project in 1984 over 68.7 miles of anadromous fish bearing streams and 1,933 acres of habitat have been protected, enhanced and maintained.« less

  9. Oblique Photogrammetry and Usage on Land Administration

    NASA Astrophysics Data System (ADS)

    Kisa, A.; Ozmus, L.; Erkek, B.; Ates, H. B.; Bakici, S.

    2013-08-01

    Projects based on Geographic Information Systems (GIS) have started within the body of the General Directorate of Land Registry and Cadastre (GDLRC) by the Land Registry and Cadastre Information System (LRCIS) in the beginning of 2000s. LRCIS was followed by other projects which are Turkish National Geographic Information System (TNGIS), Continuously Operating GPS Reference Stations (CORS-TR), Geo Metadata Portal (GMP), Orthophoto Web Services, Completion of Initial Cadastre, Cadastre Renovation Project (CRP), 2B and Land Registry Achieve Information System (LRAIS). When examining the projects generated by GDLRC, it is realized that they include basic functions of land administration required for sustainable development. Sustainable development is obtained through effective land administration as is known. Nowadays, land use becomes more intense as a result of rapid population increase. The importance of land ownership has increased accordingly. At this point, the necessity of cadastre appears. In Turkey, cadastral registration is carried out by the detection of parcels. In other words, it is obtained through the division of land surface into 2D boundaries and mapping of them. However, existing land administration systems have begun to lose their efficiency while coping with rights, restrictions and responsibilities (RRRs) belonging to land which become more complicated day by day. Overlapping and interlocking constructions appear particularly in urban areas with dense housing and consequently, the problem of how to project these structures onto the surface in 2D cadastral systems has arisen. Herein, the necessity of 3D cadastre concept and 3D property data is confronted. In recent years, oblique photogrammetry, whose applications are gradually spreading, is used as an effective method for producing 3D data. In this study, applications of oblique photogrammetry and usability of oblique images as base for 3D Cadastre and Land Administration projects are examined.

  10. How can payback from health services research be assessed?

    PubMed

    Buxton, M; Hanney, S

    1996-01-01

    Throughout the world there is a growing recognition that health care should be research-led. This strengthens the requirement for expenditure on health services research to be justified by demonstrating the benefits it produces. However, payback from health research and development is a complex concept and little used term. Five main categories of payback can be identified: knowledge; research benefits; political and administrative benefits; health sector benefits; and broader economic benefits. Various models of research utilization together with previous assessments of payback from research helped in the development of a new conceptual model of how and where payback may occur. The model combines an input-output perspective with an examination of the permeable interfaces between research and its environment. The model characterizes research projects in terms of Inputs, Processes, and Primary Outputs. The last consist of knowledge and research benefits. There are two interfaces between the project and its environment. The first (Project Specification, Selection and Commissioning) is the link with Research Needs Assessment. The second (Dissemination) should lead to Secondary Outputs (which are policy or administrative decisions), and usually Applications (which take the form of behavioural changes), from which Impacts or Final Outcomes result. It is at this final stage that health and wider economic benefits can be measured. A series of case studies were used to assess the feasibility both of applying the model and the payback categorization. The paper draws various conclusions from the case studies and identifies a range of issues for further work.

  11. Model for Developing Educational Research Productivity: The Medical Education Research Group.

    PubMed

    Perry, Marcia; Hopson, Laura; House, Joseph B; Fischer, Jonathan P; Dooley-Hash, Suzanne; Hauff, Samantha; Wolff, Margaret S; Sozener, Cemal; Nypaver, Michele; Moll, Joel; Losman, Eve D; Carney, Michele; Santen, Sally A

    2015-11-01

    Education research and scholarship are essential for promotion of faculty as well as dissemination of new educational practices. Educational faculty frequently spend the majority of their time on administrative and educational commitments and as a result educators often fall behind on scholarship and research. The objective of this educational advance is to promote scholarly productivity as a template for others to follow. We formed the Medical Education Research Group (MERG) of education leaders from our emergency medicine residency, fellowship, and clerkship programs, as well as residents with a focus on education. First, we incorporated scholarship into the required activities of our education missions by evaluating the impact of programmatic changes and then submitting the curricula or process as peer-reviewed work. Second, we worked as a team, sharing projects that led to improved motivation, accountability, and work completion. Third, our monthly meetings served as brainstorming sessions for new projects, research skill building, and tracking work completion. Lastly, we incorporated a work-study graduate student to assist with basic but time-consuming tasks of completing manuscripts. The MERG group has been highly productive, achieving the following scholarship over a three-year period: 102 abstract presentations, 46 journal article publications, 13 MedEd Portal publications, 35 national didactic presentations and five faculty promotions to the next academic level. An intentional focus on scholarship has led to a collaborative group of educators successfully improving their scholarship through team productivity, which ultimately leads to faculty promotions and dissemination of innovations in education.

  12. AN ADVANCED TOOL FOR APPLIED INTEGRATED SAFETY MANAGEMENT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Potts, T. Todd; Hylko, James M.; Douglas, Terence A.

    2003-02-27

    WESKEM, LLC's Environmental, Safety and Health (ES&H) Department had previously assessed that a lack of consistency, poor communication and using antiquated communication tools could result in varying operating practices, as well as a failure to capture and disseminate appropriate Integrated Safety Management (ISM) information. To address these issues, the ES&H Department established an Activity Hazard Review (AHR)/Activity Hazard Analysis (AHA) process for systematically identifying, assessing, and controlling hazards associated with project work activities during work planning and execution. Depending on the scope of a project, information from field walkdowns and table-top meetings are collected on an AHR form. The AHAmore » then documents the potential failure and consequence scenarios for a particular hazard. Also, the AHA recommends whether the type of mitigation appears appropriate or whether additional controls should be implemented. Since the application is web based, the information is captured into a single system and organized according to the >200 work activities already recorded in the database. Using the streamlined AHA method improved cycle time from over four hours to an average of one hour, allowing more time to analyze unique hazards and develop appropriate controls. Also, the enhanced configuration control created a readily available AHA library to research and utilize along with standardizing hazard analysis and control selection across four separate work sites located in Kentucky and Tennessee. The AHR/AHA system provides an applied example of how the ISM concept evolved into a standardized field-deployed tool yielding considerable efficiency gains in project planning and resource utilization. Employee safety is preserved through detailed planning that now requires only a portion of the time previously necessary. The available resources can then be applied to implementing appropriate engineering, administrative and personal protective equipment controls in the field.« less

  13. National Aeronautics and Space Administration (NASA)/American Society for Engineering Education (ASEE) Summer Faculty Fellowship Program, 1998. Volume 1

    NASA Technical Reports Server (NTRS)

    Bannerot, Richard B. (Editor); Sickorez, Donn G. (Editor)

    1999-01-01

    JSC NASA/ASEE Summer Faculty Fellowship Program was conducted by the University of Houston and JSC, under ASEE. The objectives of the program are to further the professional knowledge of qualified engineering and science members; stimulate an exchange of ideas between participants and NASA; enrich and refresh the research and teaching activities of participants; and contribute to the research objectives of the NASA Centers. Each faculty fellow spent at least 10 weeks at JSC engaged in a research project commensurate with his/her interests and background and worked in collaboration with a NASA/JSC colleague. This document is a compilation of the final reports on the fellows' research projects performed during the summer of 1998. Volume 1, current volume, contains the first reports, and volume 2 contains the remaining reports.

  14. Technology transfer program: Perspective

    NASA Technical Reports Server (NTRS)

    Toyshov, A. J.

    1981-01-01

    Most of NASA's technology transfer activities are in the area of land use (development, suitability, and planning); forestry (including wildlife and range and vegetation inventories) agriculture related activities; and water resources. The technology dissemination function is exercised through three regional applications centers which are involved in 91 applications projects within 22 states. In addition there are approximately eight application system verification transfer (ASVT) projects, 21 university applications branches, institutionalized liason activities with public interest groups, and user requirements activities. As the result of budget cuts, the ASVT and user requirements and awareness programs are to be phased out at the end of FY81. The university applications programs are to be phased down and terminated by 1985. NASA will continue to work with the user more in an R & D and an applications development capacity, and not in a national scale or administrative way.

  15. Greenland to gather more exploration data

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-01-28

    Danish authorities are taking steps to make more exploration data available on Greenland in advance of a possible West Greenland shelf licensing round in 1993. Seismic data acquisition and other studies continue toward more fully evaluating Greenland's oil and gas potential. Geological Survey of Greenland (GGU), Copenhagen, Denmark, is processing 2,041 line miles of reflection seismic data shot on the West Greenland shelf in August and September of 1990. Sixty-fold stacks and migrations will be obtained. Total field magnetic data were also recorded during the survey, known as project Syd Vest Seis. Early work is under way to kick offmore » the multicompany Kanumas seismic acquisition project, proposed in 1986, during 1991. Meanwhile, the Mineral Resources Administration for Greenland (MRA), Copenhagen, the Danish and Greenland governments aim to sweeten Greenland's exploration regulations prior to making areas available.« less

  16. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  17. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  18. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  19. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  20. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  1. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  2. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  3. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  4. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  5. 23 CFR 810.102 - Eligible projects.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PUBLIC TRANSPORTATION MASS TRANSIT AND SPECIAL USE HIGHWAY PROJECTS Highway Public Transportation Projects and Special Use Highway Facilities... Federal-aid system projects which facilitate the use of high occupancy vehicles and public mass...

  6. 75 FR 19670 - Marine Highway Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-15

    ... DEPARTMENT OF TRANSPORTATION Maritime Administration Marine Highway Projects ACTION: Solicitation of applications for Marine highway projects. SUMMARY: The Department of Transportation is soliciting applications for Marine Highway Projects as specified in the America's Marine Highway Program Final Rule, MARAD...

  7. Administrative Rules of the Illinois Community College Board.

    ERIC Educational Resources Information Center

    Illinois Community Coll. Board, Springfield.

    This document is a collection of administrative rules of the Illinois Community College Board (ICCB). It is divided into seven subparts: Illinois Community College Board Administration; Local District Administration; Programs; Students; Finance; Capital Projects; and Personnel. Highlights are as follows: Independent organizations may be considered…

  8. Going national with EPI in Nigeria.

    PubMed

    Reid, R S; Smith, E A

    1984-01-01

    The basic purposes set out for the Owo Local Government Area (LGA) Expanded Program on Immunization (EPI) model project in Ondo State, Nigeria, were: to demonstrate in 1 LGA that 80% EPI coverage can be achieved within the resources that the government normally provides to EPI; to dispel the unquestioning acquiescence that 10-15% coverage is all that can be done; to demonstrate that the health establishment at large can be convinced of these approaches and processes and can be expected to adopt them for a much wider dissemination; to show that a substantial number of health officers and workers are willing to work toward a higher EPI achievement; and to prove that resources from various origins can be integrated given the proper operational environment and a tight organization. The problems associated with EPI are basically similar in all Nigeria, leading to the decision to undertake a model project in a selected area. The EPI project was designed to break ground in Owo for further elements of primary health care. The project's objective was to capitalize upon the success and experience in EPI to introduce other health-related and self-help activities to communities. The project was organized with an overall project director exercising broad control and supervision over a management group at the project level. The management group is made up of a project manager, an assistant project manager, and heads of functional areas such as field operation, vaccine management system, transport system, mobile operation, health education, and administration and finance. The simple organization was designed to grow gradually to meet heavier volumes of work, altering and modifying approaches as required. The 2 key technical elements in the Owo approach were greatly increased use of cold packs and a decreased reliance on refrigerators; and increased use of simple static centers to reach remote catchment areas, instead of relying heavily on the mobile units. In both elements, the reduction of vulnerability to breakdown was the overriding objective. According to the results of an evaluation conducted in late October 1983, 52% of all children eligible for immunization had been vaccinated in the first 3 months of the project year. The main obstacle was defaults children not brought back for the 2nd and 3rd DPT shots. Another problem was in reaching mothers and children in remote catchment areas. The project is implementing its plan to incorporate weighing services in the clinics, oral rehydration therapy, essential drugs, and health education, using EPI as an entry point. Within Ondo State, LGAs are being opened up for accelerated EPI work following the Owo approach.

  9. Programme on the recyclability of food-packaging materials with respect to food safety considerations: polyethylene terephthalate (PET), paper and board, and plastics covered by functional barriers.

    PubMed

    Franz, R

    2002-01-01

    Stimulated by new ecology-driven European and national regulations, news routes of recycling waste appear on the market. Since food packages represent a large percentage of the plastics consumption and since they have a short lifetime, an important approach consists in making new packages from post-consumer used packages. On the other hand, food-packaging regulations in Europe require that packaging materials must be safe. Therefore, potential mass transfer (migration) of harmful recycling-related substances to the food must be excluded and test methods to ensure the safety-in-use of recycled materials for food packaging are needled. As a consequence of this situation, a European research project FAIR-CT98-4318, with the acronym 'Recyclability', was initiated. The project consists of three sections each focusing on a different class of recycled materials: polyethylene terephthalate (PET), paper and board, and plastics covered by functional barriers. The project consortium consists of 28 project members from 11 EU countries. In addition, the project is during its lifetime in discussion with the US Food and Drug Administrations (FDA) to consider also US FDA regulatory viewpoints and to aim, as a consequence, to harmonizable conclusions and recommendations. The paper introduces the project and presents an overview of the project work progress.

  10. Work hazards for an aging nursing workforce.

    PubMed

    Phillips, Jennan A; Miltner, Rebecca

    2015-09-01

    To discuss selected work hazards and safety concerns for aging nurses. Greater numbers of older nurses remain in the workforce. Projections suggest that one-third of the nursing workforce will be over age 50 years by 2015. Employers will struggle to find ways to protect the health and safety of their aging workforce and prevent a massive loss of intellectual and human resources when these experienced nurses exit the workforce. Review of recent relevant literature in English language journals. Repetitive motion injuries, fatigue and slips, trips and falls are three major work hazards older nurses face. We discuss several factors for each hazard, including: the normal physiological aging effects of diminished strength, hearing and vision; workplace variables of work schedules, noise and clutter; and personal characteristics of sleep disturbances, overexertion and fatigue. Inconclusive evidence exists to guide best practices for designing safe workplace environments and shift patterns for nursing work. There are at least two areas administrators can reduce work hazards for older workers: (1) modification of the workplace, and (2) creating the infrastructure to support the aging workforce to encourage healthy behaviours. © 2014 John Wiley & Sons Ltd.

  11. Data Present a Clear Picture of Time Spent on Instructional Tasks

    ERIC Educational Resources Information Center

    Seid, Carol

    2010-01-01

    The author had been an elementary administrator for about nine years when she first heard about the SAM (School Administration Manager) project. SAM is a national pilot project funded by The Wallace foundation to better understand how principals spend their time and to develop strategies to help principals focus more of their time on teaching and…

  12. Try Caring...For a Living. Wisconsin Child Care Improvement Project Child Care Administration Series.

    ERIC Educational Resources Information Center

    Wisconsin Early Childhood Association, Madison.

    A collection of 26 fact sheets on child care administration produced by the Wisconsin Child Care Improvement Project from 1986 through 1989 is presented. Individual fact sheets concern: national trends, center start-up, family day care start-up, site and facility acquisition, public funding, effective center operation, reporting of child abuse and…

  13. NASA Report to Educators, Vol. 4, No. 4, December 1976.

    ERIC Educational Resources Information Center

    National Aeronautics and Space Administration, Washington, DC.

    This periodical presents a transcript of a speech by Dr. James C. Fletcher, Administrator of the National Aeronautics and Space Administration (NASA), commemorating the Apollo-Soyuz Test Project and outlining the significance of this joint project; preliminary results of the Viking Mission to Mars, including details of the view of Mars from orbit,…

  14. 75 FR 19168 - Federal Acquisition Regulation; FAR Case 2009-005, Use of Project Labor Agreements for Federal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-13

    ... located on Indian reservations. Response: GSA, DoD, and NASA have clarified in the final rule that project... Administration (GSA), and National Aeronautics and Space Administration (NASA). ACTION: Final rule. SUMMARY: GSA, DOD, and NASA are issuing a final rule amending the Federal Acquisition Regulation (FAR) to implement...

  15. 23 CFR 810.102 - Eligible projects.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Eligible projects. 810.102 Section 810.102 Highways... SPECIAL USE HIGHWAY PROJECTS Highway Public Transportation Projects and Special Use Highway Facilities § 810.102 Eligible projects. Under this subpart the Federal Highway Administrator may approve on any...

  16. 23 CFR 810.102 - Eligible projects.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Eligible projects. 810.102 Section 810.102 Highways... SPECIAL USE HIGHWAY PROJECTS Highway Public Transportation Projects and Special Use Highway Facilities § 810.102 Eligible projects. Under this subpart the Federal Highway Administrator may approve on any...

  17. 23 CFR 810.102 - Eligible projects.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Eligible projects. 810.102 Section 810.102 Highways... SPECIAL USE HIGHWAY PROJECTS Highway Public Transportation Projects and Special Use Highway Facilities § 810.102 Eligible projects. Under this subpart the Federal Highway Administrator may approve on any...

  18. 23 CFR 810.102 - Eligible projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Eligible projects. 810.102 Section 810.102 Highways... SPECIAL USE HIGHWAY PROJECTS Highway Public Transportation Projects and Special Use Highway Facilities § 810.102 Eligible projects. Under this subpart the Federal Highway Administrator may approve on any...

  19. [Decision-making process and administrative practice: managing the State Health Secretariat in Bahia, Brazil].

    PubMed

    Coelho, Thereza Christina Bahia; Paim, Jairnilson Silva

    2005-01-01

    This case study is based on research performed by the Bahia State Health Secretariat (SESAB), aimed at analyzing management practices during the implementation of a State government administrative reform. The institutional agenda shows evidence of limited participation by civil society and technical and operational staff in problem selection and prioritization, resulting from a work process pressured by high-level executive government staff. Decisions regarding "output" (projects, services, and activities) were made under the responsibility of subordinate operational levels and did not appear as issues in the institutional routine. Concerns related to "input" (financial and human resources) consumed most of the high-level efforts, with internal and external negotiations and compromises to assure access to them. Meanwhile the possible "outcome", namely public health status, represents the "occult subject" of the institutional discourse. Information emerges in institutional disputes as a technical "power resource" in its medical, epidemiological, health, and administrative dimensions. The issue of government "representation" and allied interests is based on ideological dispositions and authoritarian practices, thus contradicting the need for management transparency and modernization.

  20. 75 FR 32940 - Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-10

    ... high-voltage transmission system carries electricity from 57 power plants encompassing 14 multi-purpose... DEPARTMENT OF ENERGY Southwestern Power Administration Western Area Power Administration Request... Act of 2005 AGENCY: Southwestern Power Administration and Western Area Power Administration...

Top