McNab, Duncan; McKay, John; Bowie, Paul
2015-11-01
Small-scale quality improvement projects are expected to make a significant contribution towards improving the quality of healthcare. Enabling doctors-in-training to design and lead quality improvement projects is important preparation for independent practice. Participation is mandatory in speciality training curricula. However, provision of training and ongoing support in quality improvement methods and practice is variable. We aimed to design and deliver a quality improvement training package to core medical and general practice specialty trainees and evaluate impact in terms of project participation, completion and publication in a healthcare journal. A quality improvement training package was developed and delivered to core medical trainees and general practice specialty trainees in the west of Scotland encompassing a 1-day workshop and mentoring during completion of a quality improvement project over 3 months. A mixed methods evaluation was undertaken and data collected via questionnaire surveys, knowledge assessment, and formative assessment of project proposals, completed quality improvement projects and publication success. Twenty-three participants attended the training day with 20 submitting a project proposal (87%). Ten completed quality improvement projects (43%), eight were judged as satisfactory (35%), and four were submitted and accepted for journal publication (17%). Knowledge and confidence in aspects of quality improvement improved during the pilot, while early feedback on project proposals was valued (85.7%). This small study reports modest success in training core medical trainees and general practice specialty trainees in quality improvement. Many gained knowledge of, confidence in and experience of quality improvement, while journal publication was shown to be possible. The development of educational resources to aid quality improvement project completion and mentoring support is necessary if expectations for quality improvement are to be realised. © The Author(s) 2015.
Methodology of quality improvement projects for the Texas Medicare population.
Pendergrass, P W; Abel, R L; Bing, M; Vaughn, R; McCauley, C
1998-07-01
The Texas Medical Foundation, the quality improvement organization for the state of Texas, develops local quality improvement projects for the Medicare population. These projects are developed as part of the Health Care Quality Improvement Program undertaken by the Health Care Financing Administration. The goal of a local quality improvement project is to collaborate with providers to identify and reduce the incidence of unintentional variations in the delivery of care that negatively impact outcomes. Two factors are critical to the success of a quality improvement project. First, as opposed to peer review that is based on implicit criteria, quality improvement must be based on explicit criteria. These criteria represent key steps in the delivery of care that have been shown to improve outcomes for a specific disease. Second, quality improvement must be performed in partnership with the health care community. As such, the health care community must play an integral role in the design and evaluation of a quality improvement project and in the design and implementation of the resulting quality improvement plan. Specifically, this article provides a historical perspective for the transition from peer review to quality improvement. It discusses key steps used in developing and implementing local quality improvement projects including topic selection, quality indicator development, collaborator recruitment, and measurement of performance/improvement. Two Texas Medical Foundation projects are described to highlight the current methodology and to illustrate the impact of quality improvement projects.
Generic project definitions for improvement of health care delivery: a case-based approach.
Niemeijer, Gerard C; Does, Ronald J M M; de Mast, Jeroen; Trip, Albert; van den Heuvel, Jaap
2011-01-01
The purpose of this article is to create actionable knowledge, making the definition of process improvement projects in health care delivery more effective. This study is a retrospective analysis of process improvement projects in hospitals, facilitating a case-based reasoning approach to project definition. Data sources were project documentation and hospital-performance statistics of 271 Lean Six Sigma health care projects from 2002 to 2009 of general, teaching, and academic hospitals in the Netherlands and Belgium. Objectives and operational definitions of improvement projects in the sample, analyzed and structured in a uniform format and terminology. Extraction of reusable elements of earlier project definitions, presented in the form of 9 templates called generic project definitions. These templates function as exemplars for future process improvement projects, making the selection, definition, and operationalization of similar projects more efficient. Each template includes an explicated rationale, an operationalization in the form of metrics, and a prototypical example. Thus, a process of incremental and sustained learning based on case-based reasoning is facilitated. The quality of project definitions is a crucial success factor in pursuits to improve health care delivery. We offer 9 tried and tested improvement themes related to patient safety, patient satisfaction, and business-economic performance of hospitals.
Improvement of the cost-benefit analysis algorithm for high-rise construction projects
NASA Astrophysics Data System (ADS)
Gafurov, Andrey; Skotarenko, Oksana; Plotnikov, Vladimir
2018-03-01
The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the "Project analysis scenario" flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.
Engaging Clinical Nurses in Quality Improvement Projects.
Moore, Susan; Stichler, Jaynelle F
2015-10-01
Clinical nurses have the knowledge and expertise required to provide efficient and proficient patient care. Time and knowledge deficits can prevent nurses from developing and implementing quality improvement or evidence-based practice projects. This article reviews a process for professional development of clinical nurses that helped them to define, implement, and analyze quality improvement or evidence-based practice projects. The purpose of this project was to educate advanced clinical nurses to manage a change project from inception to completion, using the Six Sigma DMAIC (Define, Measure, Analyze, Improve, Control) Change Acceleration Process as a framework. One-to-one mentoring and didactic in-services advanced the knowledge, appreciation, and practice of advanced practice clinicians who completed multiple change projects. The projects facilitated clinical practice changes, with improved patient outcomes; a unit cultural shift, with appreciation of quality improvement and evidence-based projects; and engagement with colleagues. Project outcomes were displayed in poster presentations at a hospital exposition for knowledge dissemination. Copyright 2015, SLACK Incorporated.
ERIC Educational Resources Information Center
Wang, Heng
2017-01-01
Construction project productivity typically lags other industries and it has been the focus of numerous studies in order to improve the project performance. This research investigated the application of Radio Frequency Identification (RFID) technology on construction projects' supply chain and determined that RFID technology can improve the…
The use of process mapping in healthcare quality improvement projects.
Antonacci, Grazia; Reed, Julie E; Lennox, Laura; Barlow, James
2018-05-01
Introduction Process mapping provides insight into systems and processes in which improvement interventions are introduced and is seen as useful in healthcare quality improvement projects. There is little empirical evidence on the use of process mapping in healthcare practice. This study advances understanding of the benefits and success factors of process mapping within quality improvement projects. Methods Eight quality improvement projects were purposively selected from different healthcare settings within the UK's National Health Service. Data were gathered from multiple data-sources, including interviews exploring participants' experience of using process mapping in their projects and perceptions of benefits and challenges related to its use. These were analysed using inductive analysis. Results Eight key benefits related to process mapping use were reported by participants (gathering a shared understanding of the reality; identifying improvement opportunities; engaging stakeholders in the project; defining project's objectives; monitoring project progress; learning; increased empathy; simplicity of the method) and five factors related to successful process mapping exercises (simple and appropriate visual representation, information gathered from multiple stakeholders, facilitator's experience and soft skills, basic training, iterative use of process mapping throughout the project). Conclusions Findings highlight benefits and versatility of process mapping and provide practical suggestions to improve its use in practice.
Ford, Bradley A.; Klutts, J. Stacey; Jensen, Chris S.; Briggs, Angela S.; Robinson, Robert A.; Bruch, Leslie A.; Karandikar, Nitin J.
2017-01-01
Training in patient safety, quality, and management is widely recognized as an important element of graduate medical education. These concepts have been intertwined in pathology graduate medical education for many years, although training programs face challenges in creating explicit learning opportunities in these fields. Tangibly involving pathology residents in management and quality improvement projects has the potential to teach and reinforce key concepts and further fulfill Accreditation Council for Graduate Medical Education goals for pursuing projects related to patient safety and quality improvement. In this report, we present our experience at a pathology residency program (University of Iowa) in engaging pathology residents in projects related to practical issues of laboratory management, process improvement, and informatics. In this program, at least 1 management/quality improvement project, typically performed during a clinical chemistry/management rotation, was required and ideally resulted in a journal publication. The residency program also initiated a monthly management/informatics series for pathology externs, residents, and fellows that covers a wide range of topics. Since 2010, all pathology residents at the University of Iowa have completed at least 1 management/quality improvement project. Many of the projects involved aspects of laboratory test utilization, with some projects focused on other areas such as human resources, informatics, or process improvement. Since 2012, 31 peer-reviewed journal articles involving effort from 26 residents have been published. Multiple projects resulted in changes in ongoing practice, particularly within the hospital electronic health record. Focused management/quality improvement projects involving pathology residents can result in both meaningful quality improvement and scholarly output. PMID:28913416
Krasowski, Matthew D; Ford, Bradley A; Klutts, J Stacey; Jensen, Chris S; Briggs, Angela S; Robinson, Robert A; Bruch, Leslie A; Karandikar, Nitin J
2017-01-01
Training in patient safety, quality, and management is widely recognized as an important element of graduate medical education. These concepts have been intertwined in pathology graduate medical education for many years, although training programs face challenges in creating explicit learning opportunities in these fields. Tangibly involving pathology residents in management and quality improvement projects has the potential to teach and reinforce key concepts and further fulfill Accreditation Council for Graduate Medical Education goals for pursuing projects related to patient safety and quality improvement. In this report, we present our experience at a pathology residency program (University of Iowa) in engaging pathology residents in projects related to practical issues of laboratory management, process improvement, and informatics. In this program, at least 1 management/quality improvement project, typically performed during a clinical chemistry/management rotation, was required and ideally resulted in a journal publication. The residency program also initiated a monthly management/informatics series for pathology externs, residents, and fellows that covers a wide range of topics. Since 2010, all pathology residents at the University of Iowa have completed at least 1 management/quality improvement project. Many of the projects involved aspects of laboratory test utilization, with some projects focused on other areas such as human resources, informatics, or process improvement. Since 2012, 31 peer-reviewed journal articles involving effort from 26 residents have been published. Multiple projects resulted in changes in ongoing practice, particularly within the hospital electronic health record. Focused management/quality improvement projects involving pathology residents can result in both meaningful quality improvement and scholarly output.
Developing Quality Improvement capacity and capability across the Children in Fife partnership.
Morris, Craig; Alexander, Ingrid
2016-01-01
A Project Manager from the Fife Early Years Collaborative facilitated a large-scale Quality Improvement (herein QI) project to build organisational capacity and capability across the Children in Fife partnership through three separate, eight month training cohorts. This 18 month QI project enabled 32 practitioners to increase their skills, knowledge, and experiences in a variety of QI tools including the Model for Improvement which then supported the delivery of high quality improvement projects and improved outcomes for children and families. Essentially growing the confidence and capability of practitioners to deliver sustainable QI. 27 respective improvement projects were delivered, some leading to service redesign, reduced waiting times, increased uptake of health entitlements, and improved accessibility to front-line health services. 13 improvement projects spread or scaled beyond the initial site and informal QI mentoring took place with peers in respective agencies. Multiple PDSA cycles were conducted testing the most efficient and effective support mechanisms during and post training, maintaining regular contact, and utilising social media to share progress and achievements.
Baillie, Lesley; Bromley, Barbara; Walker, Moira; Jones, Rebecca; Mhlanga, Fortune
2014-01-01
Preparing healthcare students for quality and service improvement is important internationally. A United Kingdom (UK) initiative aims to embed service improvement in pre-registration education. A UK university implemented service improvement teaching for all nursing students. In addition, the degree pathway students conducted service improvement projects as the basis for their dissertations. The study aimed to evaluate the implementation of service improvement projects within a pre-registration nursing curriculum. A multi-method case study was conducted, using student questionnaires, focus groups with students and academic staff, and observation of action learning sets. Questionnaire data were analysed using SPSS v19. Qualitative data were analysed using Ritchie and Spencer's (1994) Framework Approach. Students were very positive about service improvement. The degree students, who conducted service improvement projects in practice, felt more knowledgeable than advanced diploma students. Selecting the project focus was a key issue and students encountered some challenges in practice. Support for student service improvement projects came from action learning sets, placement staff, and academic staff. Service improvement projects had a positive effect on students' learning. An effective partnership between the university and partner healthcare organisations, and support for students in practice, is essential. Copyright © 2013 Elsevier Ltd. All rights reserved.
Testik, Özlem Müge; Shaygan, Amir; Dasdemir, Erdi; Soydan, Guray
It is often vital to identify, prioritize, and select quality improvement projects in a hospital. Yet, a methodology, which utilizes experts' opinions with different points of view, is needed for better decision making. The proposed methodology utilizes the cause-and-effect diagram to identify improvement projects and construct a project hierarchy for a problem. The right improvement projects are then prioritized and selected using a weighting scheme of analytical hierarchy process by aggregating experts' opinions. An approach for collecting data from experts and a graphical display for summarizing the obtained information are also provided. The methodology is implemented for improving a hospital appointment system. The top-ranked 2 major project categories for improvements were identified to be system- and accessibility-related causes (45%) and capacity-related causes (28%), respectively. For each of the major project category, subprojects were then ranked for selecting the improvement needs. The methodology is useful in cases where an aggregate decision based on experts' opinions is expected. Some suggestions for practical implementations are provided.
How to conduct a clinical audit and quality improvement project.
Limb, Christopher; Fowler, Alex; Gundogan, Buket; Koshy, Kiron; Agha, Riaz
2017-07-01
Audits and quality improvement projects are vital aspects of clinical governance and continual service improvement in medicine. In this article we describe the process of clinical audit and quality improvement project. Guidance is also provided on how to design an effective audit and bypass barriers encountered during the process.
Effects of organizational context on Lean implementation in five hospital systems.
Harrison, Michael I; Paez, Kathryn; Carman, Kristin L; Stephens, Jennifer; Smeeding, Lauren; Devers, Kelly J; Garfinkel, Steven
2016-01-01
Despite broad agreement among researchers about the value of examining how context shapes implementation of improvement programs and projects, limited attention has been paid to contextual effects on implementation of Lean. To help reduce gaps in knowledge of effects of intraorganizational context, we researched Lean implementation initiatives in five organizations and examined 12 of their Lean rapid improvement projects. All projects aimed at improving clinical care delivery. On the basis of the literature on Lean, innovation, and quality improvement, we developed a framework of factors likely to affect Lean implementation and outcomes. Drawing on the framework, we conducted semistructured interviews and applied qualitative codes to the transcribed interviews. Available documents, data, and observations supplemented the interviews. We constructed case studies of Lean implementation in each organization, compared implementation across organizations, and compared the 12 projects. Intraorganizational characteristics affecting organization-wide Lean initiatives and often also shaping project outcomes included CEO commitment to Lean and active support for it, prior organizational capacity for quality improvement-based performance improvement, alignment of the Lean initiative with the organizational mission, dedication of resources and experts to Lean, staff training before and during projects, establishment of measurable and relevant project targets, planning of project sequences that enhance staff capabilities and commitment without overburdening them, and ensuring communication between project members and other affected staff. Dependence of projects on inputs of new information technology was a barrier to project success. Incremental implementation of Lean produced reported improvements in operational efficiency and occasionally in care quality. However, even under the relatively favorable circumstances prevailing in our study sites, incremental implementation did not readily change organizational culture. This study should alert researchers, managers, and teachers of management to ways that contexts shape Lean implementation and may affect other types of process redesign and quality improvement.
Homeless Veterans: Management Improvements Could Help VA Better Identify Supportive Housing Projects
2016-12-01
HOMELESS VETERANS Management Improvements Could Help VA Better Identify Supportive-Housing Projects Report to...VETERANS Management Improvements Could Help VA Better Identify Supportive-Housing Projects What GAO Found As of September 2016, for veterans who...disabled veterans. These supportive-housing EULs receive project -based HUD-VASH vouchers, which provide housing subsidies, on-site case management
7 CFR 4280.149 - Requirements after project construction.
Code of Federal Regulations, 2011 CFR
2011-01-01
... paragraphs (a) and (b) of this section, as applicable. (a) Renewable energy projects. For renewable energy... future similar projects. (7) Actual jobs created or saved. (b) Energy efficiency improvement projects. For energy efficiency improvement projects, commencing the first full calendar year following the year...
ERIC Educational Resources Information Center
North Forest Independent School District, Houston, TX.
Project ORDER is a pilot project tested in an urban middle school in Houston, Texas. The program was intended to improve the general school atmosphere; to improve students' attitudes toward the school, its program, faculty, and administration; to show significant improvement in pupil behavior; and to substantially improve teaching-learning…
ERIC Educational Resources Information Center
Doyle, John Kevin
2010-01-01
Critical Chains project management focuses on holding buffers at the project level vs. task level, and managing buffers as a project resource. A number of studies have shown that Critical Chain project management can significantly improve organizational schedule fidelity (i.e., improve the proportion of projects delivered on time) and reduce…
Improve strategic supplier performance using DMAIC to develop a Quality Improvement Plan
NASA Astrophysics Data System (ADS)
Jardim, Kevin P.
Supplier performance that meets the requirements of the customer has long plagued quality professionals. Despite the vast efforts by organizations to improve supplier performance, little has been done to standardize the plan to improve performance. This project presents a guideline and problem-solving strategy using a Define, Measure, Analyze, Improve, and Control (DMAIC) structured tool that will assist in the management and improvement of supplier performance. An analysis of benchmarked Quality Improvement Plans indicated that this topic needs more focus on how to accomplish improved supplier performance. This project is part of a growing body of supplier continuous improvement efforts. With the input of Zodiac Aerospace quality professionals this project's results provide a solution to Quality Improvement Plans and show objective evidence of its benefits. This project contributes to the future research on similar topics.
Clackamas/Hood River Habitat Enhancement Program, 1987 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
MacDonald, Ken; Cain, Thomas C.; Heller, David A.
1988-03-01
Fisheries habitat improvement work is being done on priority drainages in the Clackamas and Rood River sub-basins under program measure 704(c), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program. This report describes the work completed in 1987 for Bonneville Power Administration (BPA) project number 84-11, the Clackamas/Hood River Habitat Enhancement Program. The program is composed of six projects: Collawash River Habitat Improvement Project; Collawash River Falls Passage Improvement Project, Oak Grove Fork Habitat Improvement Project; Lake Branch/West Fork Hood River Habitat Improvement Project; Fifteenmile Creek Habitat Improvement Project; and Abundance, Behavior, andmore » Habitat Utilization by Coho Salmon and Steelhead Trout in Fish Creek, Oregon, As Influenced by Habitat Enhancement. This ongoing program was initiated in 1984, although some of the projects were begun with BPA funding support as early as 1983. The projects are complemented by a variety of habitat improvement and management activities funded from a variety of Forest Service sources. This report describes the activities implemented for five of the six projects. A separate annual report on the 1987 habitat improvement and monitoring/evaluation efforts in the Fish Creek drainage has been prepared. Species for management emphasis include spring chinook and coho salmon, and summer and winter steelhead trout. Project work in 1987 primarily focused on increasing the quantity and quality of available rearing habitat, and improving access at passage barriers. The underlying theme of the improvement work has been to increase habitat diversity through the introduction of ''structure''. Structure provided by logs and boulders serves to deflect, pond, or otherwise disrupt flow patterns within a stream channel. This alteration of flow patterns results in formation of an increased number of habitat niches (i.e. pools, glides, alcoves, etc. ) in which a variety of species and age group: of salmon and trout can rear. It also results in the sorting of gravel, rubble, and boulders being transported downstream, creating high quality spawning and rearing habitats, and food producing areas. In 1987, a total of 11.0 miles of stream were treated; 334 log structures (Including: ''deflector'', ''digger'', ''sill'', and ''cover'' logs) and 141 boulder structures (including: single boulder placement, ''berms'', ''alcoves'', and ''clusters'') were completed to meet habitat improvement objectives. In addition to these direct habitat improvement activities, BPA and the Forest Service financed a number of project and program assessment activities that have improved the efficiency and effectiveness of the Forest's fisheries management program. Notable findings relate to the durability of habitat improvement structures, the associated changes in physical habitat, and biological response to the improvement activities. A discussion of the 1987 habitat monitoring and evaluation program results can be found in the supplemental document, Appendix: Monitoring and Evaluation of Mt. Hood National Forest Stream Habitat Improvement and Rehabilitation Projects: 1987 Annual Report (Forsgren, Heller, and Ober, 1988).« less
A tool to aid the comparison of improvement projects for the Virginia Department of Transportation.
DOT National Transportation Integrated Search
1998-01-01
The goal of this effort is to assist the Virginia Department of Transportation (VDOT) in improving the comparison in planning of potential primary and secondary roadway improvement projects. Historical projects that have been implemented or considere...
Four Tools for Science Fair Success
ERIC Educational Resources Information Center
Smith, Sherry Weaver; Messmer, Barbara; Storm, Bill; Weaver, Cheryl
2007-01-01
These teacher-tested ideas will guide students in creating true inquiry-based projects. Two of the ideas, the Topic Selection Wizard and Science Project Timeline, are appropriate for all science fair programs, even new ones. For existing programs, the Black Box of Project Improvement and After-School Project Clinic improve project quality and…
Kolasinski, Vallerie A; Price, David W
2015-01-01
Context: A Maintenance of Certification Part IV project was created on the basis of an existing, multifaceted hypertension improvement program. Objective: To evaluate the impact of the Maintenance of Certification project, the effects of the improvement options on blood pressure control in hypertensive patients, and the participants’ perception of the workload related to participation in the project. Design: Nonexperimental retrospective analysis. Setting: Kaiser Permanente hospitals and medical office buildings in Northern California. Intervention: Participants used one or more options from a defined menu of strategies to attempt to increase the percentage of hypertensive patients on their patient panels who had controlled blood pressure. Main Outcome Measure: Proportion of hypertensive patients with blood pressure ≤ 139/89 mm Hg. Results: Fifty-two American Board of Family Medicine and 19 American Board of Internal Medicine certified physicians completed projects. Mean panel blood pressure control improved from 79.49% (standard deviation [SD] = 11.32) to 84.64% (SD = 7.80). The choice of improvement option was not associated with the level of improvement or with the participants’ perception of the workload related to completing the project. Conclusion: Project participants improved the care of their patients without an increased perceived burden to their practice. We found no association between the choice of improvement option and either the level of improvement or the perception of workload. PMID:25785642
Combining Project Management Methods: A Case Study of Dlstributed Work Practices
NASA Astrophysics Data System (ADS)
Backlund, Per; Lundell, Björn
The increasing complexity of information systems development (ISD) projects call for improved project management practices. This, together with an endeavour to improve the success rate of ISD projects (Lyytinen and Robey 1999; Cooke-Davies 2002; White and Fortune 2002), has served as drivers for various efforts in process improvement such as the introduction of new development methods (Fitzgerald 1997; Iivari and Maansaari 1998).
ERIC Educational Resources Information Center
Reed, Tipawan Truong-Quang
Project Employment Assistance and Skill Enhancement (EASE II) was an on-the-job literacy and basic skills improvement project for employees of small companies in the metal working industry in the Chicago area. The goal of the project was to improve literacy skills, leading to the improvement of work force productivity targeted to disadvantaged…
Quantitative CMMI Assessment for Offshoring through the Analysis of Project Management Repositories
NASA Astrophysics Data System (ADS)
Sunetnanta, Thanwadee; Nobprapai, Ni-On; Gotel, Olly
The nature of distributed teams and the existence of multiple sites in offshore software development projects pose a challenging setting for software process improvement. Often, the improvement and appraisal of software processes is achieved through a turnkey solution where best practices are imposed or transferred from a company’s headquarters to its offshore units. In so doing, successful project health checks and monitoring for quality on software processes requires strong project management skills, well-built onshore-offshore coordination, and often needs regular onsite visits by software process improvement consultants from the headquarters’ team. This paper focuses on software process improvement as guided by the Capability Maturity Model Integration (CMMI) and proposes a model to evaluate the status of such improvement efforts in the context of distributed multi-site projects without some of this overhead. The paper discusses the application of quantitative CMMI assessment through the collection and analysis of project data gathered directly from project repositories to facilitate CMMI implementation and reduce the cost of such implementation for offshore-outsourced software development projects. We exemplify this approach to quantitative CMMI assessment through the analysis of project management data and discuss the future directions of this work in progress.
DOT National Transportation Integrated Search
2013-04-01
The USDOT and Federal Highway Administration (FHWA) recommend the smart use of innovative project : delivery systems, such as design-build, to improve efficiency and effectiveness of developing transportation : projects. Although design-build provide...
76 FR 58840 - Central Valley Project Improvement Act; Refuge Water Management Plans
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-22
... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act; Refuge Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: To meet the requirements of the Central Valley Project Improvement Act of 1992 (CVPIA) and subsequent...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-04
... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Correction; Central Valley Project Improvement Act, Standard Criteria for Agricultural and Urban Water Management Plans AGENCY: Bureau of Reclamation... notice in the Federal Register at 76 FR 16818 on the Central Valley Project Improvement Act Standard...
Forest tree improvement research in the Lake States, 1965.
Paul O. Rudolf
1966-01-01
Gives brief reports on 133 forest tree improvement research projects conducted by 12 agencies and 8 developmental tree improvement projects being conducted by 4 agencies in Michigan, Minnesota, North Dakota, and Wisconsin. Reports the object, species studied, methods, accomplishments, cooperators, and assignment for each project. Includes indexes by genera and...
2016-09-30
Improvements Needed in Managing Scope Changes and Oversight of Construction Projects at Camp Lemonnier, Djibouti S E P T E M B E R 3 0 , 2 0 1 6 Report...Improvements Needed in Managing Scope Changes and Oversight of Construction Projects at Camp Lemonnier, Djibouti Visit us at www.dodig.mil Objective We...Findings (cont’d) ii │ DODIG-2016-141 (Project No. D2014-D000RE-0157.000) Results in Brief Improvements Needed in Managing Scope Changes and Oversight
Project Management Life Cycle Models to Improve Management in High-rise Construction
NASA Astrophysics Data System (ADS)
Burmistrov, Andrey; Siniavina, Maria; Iliashenko, Oksana
2018-03-01
The paper describes a possibility to improve project management in high-rise buildings construction through the use of various Project Management Life Cycle Models (PMLC models) based on traditional and agile project management approaches. Moreover, the paper describes, how the split the whole large-scale project to the "project chain" will create the factor for better manageability of the large-scale buildings project and increase the efficiency of the activities of all participants in such projects.
Devi, V; Abraham, R R; Adiga, A; Ramnarayan, K; Kamath, A
2010-01-01
Healthcare decision-making is largely reliant on evidence-based medicine; building skills in scientific reasoning and thinking among medical students becomes an important part of medical education. Medical students in India have no formal path to becoming physicians, scientists or academicians. This study examines students' perceptions regarding research skills improvement after participating in the Mentored Student Project programme at Melaka Manipal Medical College, Manipal Campus, India. Additionally, this paper describes the initiatives taken for the continual improvement of the Mentored Student Project programme based on faculty and student perspectives. At Melaka Manipal Medical College, Mentored Student Project was implemented in the curriculum during second year of Bachelor of Medicine and Bachelor of Surgery programme with the intention of developing research skills essential to the career development of medical students. The study design was cross-sectional. To inculcate the spirit of team work students were grouped (n=3 to 5) and each group was asked to select a research project. The students' research projects were guided by their mentors. A questionnaire (Likert's five point scale) on students' perceptions regarding improvement in research skills after undertaking projects and guidance received from the mentor was administered to medical students after they had completed their Mentored Student Project. The responses of students were summarised using percentages. The median grade with inter-quartile range was reported for each item in the questionnaire. The median grade for all the items related to perceptions regarding improvement in research skills was 4 which reflected that the majority of the students felt that Mentored Student Project had improved their research skills. The problems encountered by the students during Mentored Student Project were related to time management for the Mentored Student Project and mentors. This study shows that students acknowledged that their research skills were improved after participating in the Mentored Student Project programme. The Mentored Student Project programme was successful in fostering positive attitudes among medical students towards scientific research. The present study also provides scope for further improvement of the Mentored Student Project programme based on students' and faculty perspectives.
INNOVATIONS FOR INSTRUCTIONAL IMPROVEMENT.
ERIC Educational Resources Information Center
CUSHMAN, M.L.; STURGES, A.W.
THE CATSKILL AREA PROJECT IN SMALL SCHOOL DESIGN, THE ROCKY MOUNTAIN AREA PROJECT FOR SMALL HIGH SCHOOLS, THE WESTERN STATES SMALL SCHOOLS PROJECT, AND THE TEXAS SMALL SCHOOLS PROJECT ARE DESCRIBED AND COMPARED. FINANCIAL SUPPORT COMPARISONS ARE MADE. METHODS OF IMPROVING INSTRUCTION ARE DIVIDED INTO TEACHER-CENTERED AND ADMINISTRATOR-CENTERED…
The maturing of the quality improvement paradigm in the SEL
NASA Technical Reports Server (NTRS)
Basili, Victor R.
1993-01-01
The Software Engineering Laboratory uses a paradigm for improving the software process and product, called the quality improvement paradigm. This paradigm has evolved over the past 18 years, along with our software development processes and product. Since 1976, when we first began the SEL, we have learned a great deal about improving the software process and product, making a great many mistakes along the way. Quality improvement paradigm, as it is currently defined, can be broken up into six steps: characterize the current project and its environment with respect to the appropriate models and metrics; set the quantifiable goals for successful project performance and improvement; choose the appropriate process model and supporting methods and tools for this project; execute the processes, construct the products, and collect, validate, and analyze the data to provide real-time feedback for corrective action; analyze the data to evaluate the current practices, determine problems, record findings, and make recommendations for future project improvements; and package the experience gained in the form of updated and refined models and other forms of structured knowledge gained from this and prior projects and save it in an experience base to be reused on future projects.
Mohammadi, S Mehrdad; Mohammadi, S Farzad; Hedges, Jerris R; Zohrabi, Morteza; Ameli, Omid
2007-08-01
Reports addressing continuous quality improvement (CQI) methods in developing countries are scant and there are questions about the applicability of quality improvement methods in such settings. The structure and output of a formal quality improvement program implemented in a teaching hospital affiliated with the Tehran University of Medical Sciences is presented. OBJECTIVE METHOD: During a nine-month period, a multi-stage quality improvement program was implemented. It comprised: (i) training workshops; (ii) a steering committee; (iii) weekly consultation and facilitation of improvement projects; and (iv) a day-long demonstration and recognition meeting. Four cycles of workshops were held in which 132 employees were trained in the basics of CQI. Thirty improvement projects were initiated. Twenty-five of the projects were completed. In an evaluation survey more than 70% of respondents assessed a 'positive impact' on organizational culture, work efficiency and quality of services. More than 90% believed that the changes were sustained, and more than 60% reported that they have implemented additional improvement projects. Our quality improvement package supported rapid implementation of multiple projects. The underlying 'change structure' comprised the improvement teams, top management and the university's quality improvement office; it integrated project management, support and facilitation functions by the respective participant. Organization-wide change was more limited than anticipated. To institutionalize the program and ensure sustainability, a local structure for change should be organized, management coaching should be sustained, local facilitators should be developed, incentives should be established and physician involvement should be emphasized.
ERIC Educational Resources Information Center
Coast Guard, Washington, DC. Office of Personnel.
Project Improve, the new title for the Coast Guard Aircraft Repair and Supply Center (AR&SC) Testing and Counseling Program in Elizabeth City, N.C., expresses the idea of this study: to assist all employees in gaining better understanding of their full potential and their training needs. The results of Project Improve are listed in tables…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-15
...)] Notice of Availability of the Record of Decision for the I-65 to US 31W Access Improvement Final... implement the I-65 to US 31W Access Improvement project in Warren County, Kentucky. The Division... US 31W Access Improvement project can be viewed and downloaded from the project Web site at http...
Transferring skills in quality collaboratives focused on improving patient logistics.
Weggelaar-Jansen, Anne Marie; van Wijngaarden, Jeroen
2018-04-02
A quality improvement collaborative, often used by the Institute for Healthcare Improvement, is used to educate healthcare professionals and improve healthcare at the same time. However, no prior research has been done on the knowledge and skills healthcare professionals need to achieve improvements or the extent to which quality improvement collaboratives help enhance both knowledge and skills. Our research focused on quality improvement collaboratives aiming to improve patient logistics and tried to identify which knowledge and skills are required and to what extent these were enhanced during the QIC. We defined skills important for logistic improvements in a three-phase Delphi study. Based on the Delphi results we made a questionnaire. We surveyed participants in a national quality improvement collaborative to assess the skills rated as 1) important, 2) available and 3) improved during the collaborative. At two sense-making meetings, experts reflected on our findings and hypothesized on how to improve (logistics) collaboratives. The Delphi study found 18 skills relevant for reducing patient access time and 21 for reducing throughput time. All skills retrieved from the Delphi study were scored as 'important' in the survey. Teams especially lacked soft skills connected to project and change management. Analytical skills increased the most, while more reflexive skills needed for the primary goal of the collaborative (reduce access and throughput times) increased modestly. At two sense-making meetings, attendees suggested four improvements for a quality improvement collaborative: 1) shift the focus to project- and change management skills; 2) focus more on knowledge transfer to colleagues; 3) teach participants to adapt the taught principles to their own situations; and 4) foster intra-project reflexive learning to translate gained insights to other projects (inter-project learning). Our findings seem to suggest that Quality collaboratives could benefit if more attention is paid to the transfer of 'soft skills' (e.g. change, project management and communication skills) and reflexive skills (e.g. adjusting logistics principles to specific situations and inter-project translation of experiences).
A portfolio evaluation framework for air transportation improvement projects
NASA Astrophysics Data System (ADS)
Baik, Hyeoncheol
This thesis explores the application of portfolio theory to the Air Transportation System (ATS) improvement. The ATS relies on complexly related resources and different stakeholder groups. Moreover, demand for air travel is significantly increasing relative to capacity of air transportation. In this environment, improving the ATS is challenging. Many projects, which are defined as technologies or initiatives, for improvement have been proposed and some have been demonstrated in practice. However, there is no clear understanding of how well these projects work in different conditions nor of how they interact with each other or with existing systems. These limitations make it difficult to develop good project combinations, or portfolios that maximize improvement. To help address this gap, a framework for identifying good portfolios is proposed. The framework can be applied to individual projects or portfolios of projects. Projects or portfolios are evaluated using four different groups of factors (effectiveness, time-to-implement, scope of applicability, and stakeholder impacts). Portfolios are also evaluated in terms of interaction-determining factors (prerequisites, co-requisites, limiting factors, and amplifying factors) because, while a given project might work well in isolation, interdependencies between projects or with existing systems could result in lower overall performance in combination. Ways to communicate a portfolio to decision makers are also introduced. The framework is unique because (1) it allows using a variety of available data, and (2) it covers diverse benefit metrics. For demonstrating the framework, an application to ground delay management projects serves as a case study. The portfolio evaluation approach introduced in this thesis can aid decision makers and researchers at universities and aviation agencies such as Federal Aviation Administration (FAA), National Aeronautics and Space Administration (NASA), and Department of Defense (DoD), in more fully evaluating the air transportation improvement projects.
Canal, David F; Torbeck, Laura; Djuricich, Alexander M
2007-05-01
Surgery residents can learn continuous quality improvement (CQI) principles within a structured curriculum and propose quality improvement projects. Curriculum within a surgical residency program. A university surgical residency program with multiple hospital training sites. Fifteen surgical residents during the dedicated research year. A curriculum in CQI that focuses on devising a quality improvement project. Resident self-reported attitudes about quality improvement and implementation of resident-initiated quality improvement projects. Resident survey data demonstrated an improvement in knowledge, self-efficacy, and experiences within CQI. Fifteen individual residents, within smaller teams, created 4 quality improvement projects worthy of implementation. A structured CQI curriculum can be successfully integrated into a general surgery residency program. Residents can learn the skill of constructing CQI project ideas within the framework of the plan-do-study-act cycle. Residents are eager to make improvements in their local system of residency. By giving them the tools to critically investigate systems improvement and a much needed ear to hear their concerns and suggestions for improvement, we found ways to potentially enhance patient care and developed ideas to improve the education of future surgeons. In doing so, we provided the residents with "buy-in" into their residency program, while addressing the competency of practice-based learning and improvement required by the Accreditation Council for Graduate Medical Education for resident education.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-25
... Valley Project water conservation best management practices (BMPs) that shall develop Criteria for... project contractors using best available cost- effective technology and best management practices.'' The... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Standard...
7 CFR 4280.113 - Project eligibility.
Code of Federal Regulations, 2014 CFR
2014-01-01
... General Renewable Energy System and Energy Efficiency Improvement Grants § 4280.113 Project eligibility. For a renewable energy system or energy efficiency improvement project to be eligible to receive a RES... specified in paragraph (k) of this section. (a) The project must be for the purchase of a renewable energy...
7 CFR 4280.113 - Project eligibility.
Code of Federal Regulations, 2012 CFR
2012-01-01
... General Renewable Energy System and Energy Efficiency Improvement Grants § 4280.113 Project eligibility. For a renewable energy system or energy efficiency improvement project to be eligible to receive a RES... specified in paragraph (k) of this section. (a) The project must be for the purchase of a renewable energy...
7 CFR 4280.113 - Project eligibility.
Code of Federal Regulations, 2013 CFR
2013-01-01
... General Renewable Energy System and Energy Efficiency Improvement Grants § 4280.113 Project eligibility. For a renewable energy system or energy efficiency improvement project to be eligible to receive a RES... specified in paragraph (k) of this section. (a) The project must be for the purchase of a renewable energy...
I-25 truck safety improvements project : local evaluation report
DOT National Transportation Integrated Search
2004-12-29
The I-25 Truck Safety Improvements project (I-25 TSIP) is the result of a FY98 congressionally designated earmark to support improvements in transportation efficiency, promote safety, increase traffic flow, reduce emissions, improve traveler informat...
Langston, Anne; Weiss, Jennifer; Landegger, Justine; Pullum, Thomas; Morrow, Melanie; Kabadege, Melene; Mugeni, Catherine; Sarriot, Eric
2014-08-01
The Kabeho Mwana project (2006-2011) supported the Rwanda Ministry of Health (MOH) in scaling up integrated community case management (iCCM) of childhood illness in 6 of Rwanda's 30 districts. The project trained and equipped community health workers (CHWs) according to national guidelines. In project districts, Kabeho Mwana staff also trained CHWs to conduct household-level health promotion and established supervision and reporting mechanisms through CHW peer support groups (PSGs) and quality improvement systems. The 2005 and 2010 Demographic and Health Surveys were re-analyzed to evaluate how project and non-project districts differed in terms of care-seeking for fever, diarrhea, and acute respiratory infection symptoms and related indicators. We developed a logit regression model, controlling for the timing of the first CHW training, with the district included as a fixed categorical effect. We also analyzed qualitative data from the final evaluation to examine factors that may have contributed to improved outcomes. While there was notable improvement in care-seeking across all districts, care-seeking from any provider for each of the 3 conditions, and for all 3 combined, increased significantly more in the project districts. CHWs contributed a larger percentage of consultations in project districts (27%) than in non-project districts (12%). Qualitative data suggested that the PSG model was a valuable sub-level of CHW organization associated with improved CHW performance, supervision, and social capital. The iCCM model implemented by Kabeho Mwana resulted in greater improvements in care-seeking than those seen in the rest of the country. Intensive monitoring, collaborative supervision, community mobilization, and CHW PSGs contributed to this success. The PSGs were a unique contribution of the project, playing a critical role in improving care-seeking in project districts. Effective implementation of iCCM should therefore include CHW management and social support mechanisms. Finally, re-analysis of national survey data improved evaluation findings by providing impact estimates.
Hina-Syeda, Hussaini; Kimbrough, Christina; Murdoch, William; Markova, Tsveti
2013-01-01
Quality improvement education and work in interdisciplinary teams is a healthcare priority. Healthcare systems are trying to meet core measures and provide excellent patient care, thus improving their Hospital Consumer Assessment of Healthcare Providers & Systems scores. Crittenton Hospital Medical Center in Rochester Hills, MI, aligned educational and clinical objectives, focusing on improving immunization rates against pneumonia and influenza prior to the rates being implemented as core measures. Improving immunization rates prevents infections, minimizes hospitalizations, and results in overall improved patient care. Teaching hospitals offer an effective way to work on clinical projects by bringing together the skill sets of residents, faculty, and hospital staff to achieve superior results. WE DESIGNED AND IMPLEMENTED A STRUCTURED CURRICULUM IN WHICH INTERDISCIPLINARY TEAMS ACQUIRED KNOWLEDGE ON QUALITY IMPROVEMENT AND TEAMWORK, WHILE FOCUSING ON A SPECIFIC CLINICAL PROJECT: improving global immunization rates. We used the Lean Six Sigma process tools to quantify the initial process capability to immunize against pneumococcus and influenza. The hospital's process to vaccinate against pneumonia overall was operating at a Z score of 3.13, and the influenza vaccination Z score was 2.53. However, the process to vaccinate high-risk patients against pneumonia operated at a Z score of 1.96. Improvement in immunization rates of high-risk patients became the focus of the project. After the implementation of solutions, the process to vaccinate high-risk patients against pneumonia operated at a Z score of 3.9 with a defects/million opportunities rate of 9,346 and a yield of 93.5%. Revisions to the adult assessment form fixed 80% of the problems identified. This process improvement project was not only beneficial in terms of improved quality of patient care but was also a positive learning experience for the interdisciplinary team, particularly for the residents. The hospital has completed quality improvement projects in the past; however, this project was the first in which residents were actively involved. The didactic components and experiential learning were powerfully synergistic. This and similar projects can have far-reaching implications in terms of promoting patient health and improving the quality of care delivered by the healthcare systems and teaching hospitals.
Improving the quality of life of aged care residents through the joy of food: The Lantern Project.
Hugo, Cherie; Dwonczyk, Marcia; Skinner, Jan; Isenring, Liz
2018-03-23
Mealtimes directly impact the quality of life of residents in aged care. The objective of The Lantern Project is to improve the dining experience of aged care residents to reduce malnutrition risk through improving dietary intake, meal. A transdisciplinary team of aged care professionals and resident advocates was formed as a collaboration collectively known as The Lantern Project. This paper outlines the journey and timeline of The Lantern Project collaboration since its inception and the interplay between the monthly stakeholder meetings and inter-related research projects demonstrating improved outcomes. Transdisciplinary collaboration offers well-grounded benefits and realistic strategies sensitive to the complexity of the aged care setting. © 2018 AJA Inc.
Evolution and outcomes of a quality improvement program.
Thor, Johan; Herrlin, Bo; Wittlöv, Karin; Øvretveit, John; Brommels, Mats
2010-01-01
The purpose of this paper is to examine the outcomes and evolution over a five-year period of a Swedish university hospital quality improvement program in light of enduring uncertainty regarding the effectiveness of such programs in healthcare and how best to evaluate it. The paper takes the form of a case study, using data collected as part of the program, including quality indicators from clinical improvement projects and participants' program evaluations. Overall, 58 percent of the program's projects (39/67) demonstrated success. A greater proportion of projects led by female doctors demonstrated success (91 percent, n=11) than projects led by male doctors (51 percent, n=55). Facilitators at the hospital continuously adapted the improvement methods to the local context. A lack of dedicated time for improvement efforts was the participants' biggest difficulty. The dominant benefits included an increased ability to see the "bigger picture" and the improvements achieved for patients and employees. Quality measurement, which is important for conducting and evaluating improvement efforts, was weak with limited reliability. Nevertheless, the present study adds evidence about the effectiveness of healthcare improvement programs. Gender differences in improvement team leadership merit further study. Improvement program evaluation should assess the extent to which improvement methods are locally adapted and applied. This case study reports the outcomes of all improvement projects undertaken in one healthcare organization over a five-year period and provides in-depth insight into an improvement program's changeable nature.
Elementary and middle school science improvement project
NASA Technical Reports Server (NTRS)
Mcguire, Saundra Yancy
1987-01-01
The Alabama A & M University Elementary and Middle School Science Improvement Project (Project SIP) was instituted in response to a need to improve the ability of North Alabama teachers to teach science effectively using the experimental or hands-on approach. The major component of the project was a two-week workshop. Follow-up visits were made to the classrooms of many of the participating teachers to obtain information on how the program was being implemented in the classroom. The administrative aspects of the program, the delivery of the services to participating teachers, and the project outcomes are addressed.
Payback as an investment criterion for sawmill improvement projects
G. B. Harpole
1983-01-01
Methods other than presented here should be used to assess projects for likely return on investment; but, payback is simple to calculate and can be used for calculations that will indicate the relative attractiveness of alternative improvement projects. This paper illustrates how payback ratios are calculated, how they can be used to rank alternative improvement...
Approaching the Practice Quality Improvement Project in Interventional Radiology.
Reis, Stephen P; White, Benjamin; Sutphin, Patrick D; Pillai, Anil K; Kalva, Sanjeeva P; Toomay, Seth M
2015-12-01
An important component of maintenance of certification and quality improvement in radiology is the practice quality improvement (PQI) project. In this article, the authors describe several methodologies for initiating and completing PQI projects. Furthermore, the authors illustrate several tools that are vital in compiling, analyzing, and presenting data in an easily understandable and reproducible manner. Last, they describe two PQI projects performed in an interventional radiology division that have successfully improved the quality of care for patients. Using the DMAIC (define, measure, analyze, improve, control) quality improvement framework, interventional radiology throughput has been increased, to lessen mediport wait times from 43 to 8 days, and mediport infection rates have decreased from more than 2% to less than 0.4%. Copyright © 2015 American College of Radiology. Published by Elsevier Inc. All rights reserved.
Kim, Hyun; Malatesta, Theresa M; Simone, Nicole L; Den, Robert B; McAna, John; Dicker, Adam P; Bar Ad, Voichita
2016-01-01
The Next Accreditation System (NAS) requires radiation oncology residents to do a formal quality improvement project during their residency. The American Board of Radiology (ABR) Maintenance of Certification (MOC) program requires certified physicians to complete a Practice Quality Improvement (PQI) project approximately every 3 years. The purpose of our project was to develop a clinical transition of care policy via a process that resulted in quality improvement project credit for residents and PQI credit for participating faculty. Approval for project implementation was obtained from the ABR MOC committee. The PQI project consisted of an initial survey to assess resident perception on resident transition of care in our department, formal sign-out training, and 2 postintervention surveys after 1 and 11 months. The primary endpoint was the percentage of questions with ≤1 unfavorable responses. Sign-test was used to determine response difference from neutral. One hundred percent of surveyed residents completed the preintervention (n = 6), postintervention 1 (n = 7), and postintervention 2 (n = 8) surveys. In the preintervention, postintervention 1, and postintervention 2 surveys, 71.4%, 57.1%, and 57.1% of questions were answered with ≤1 unfavorable response, respectively. The number of questions with ≥75% favorable response was 7 (50%), 7 (50%), and 11 (78.5%) in the preintervention, postintervention 1, and postintervention 2 surveys, respectively (P = .13). A written sign-out template and monthly protected sign-out meetings were instituted. One resident and 3 attending physicians received credit for Accreditation Council of Graduate Medical Education NAS quality improvement and ABR MOC PQI projects, respectively. This project shows the feasibility of a combined attending and resident physician effort to improve patient care and fulfill his or her respective ABR MOC PQI and Accreditation Council of Graduate Medical Education NAS requirements. Attending and resident physicians can tailor collaborative projects to fulfill MOC and NAS requirements unique to their subspecialty. Written sign-out templates and protected sign-out time may improve transition of care. Copyright © 2016 American Society for Radiation Oncology. Published by Elsevier Inc. All rights reserved.
Umatilla River Subbasin Fish Habitat Improvement Program, 1996-2003 Summary Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
St. Hilaire, Danny R.; Montgomery, Michael; Bailey, Timothy D.
This annual report is in fulfillment of contractual obligations with Bonneville Power Administration (BPA), which is the funding source for the Oregon Department of Fish and Wildlife's (ODFW), Umatilla River Subbasin Fish Habitat Improvement Program (Program). The last Annual Program Report was submitted in 1997, and described projects undertaken in 1995. This report describes Program activities carried out in 2003, along with a summary of projects undertaken during the years 1996 through 2002. The Program works cooperatively with private landowners to develop long-term restoration agreements, under which, passive and active Habitat Improvement Projects are conducted. Historically, projects have included livestockmore » exclusion fencing (passive restoration) to protect riparian habitats, along with the installation of instream structures (active restoration) to address erosion and improve fish habitat. In recent years, the focus of active restoration has shifted to bioengineering treatments and, more recently, to channel re-design and re-construction aimed at improving fish habitat, by restoring stable channel function. This report provides a summary table of past projects (1996-2002), along with a text description of more extensive habitat improvement projects, including: (1) Implementation of a four-phased project on the Lobato property (Birch Creek) beginning in 1996 and involving a demonstration bioengineering site and riparian improvements (fencing, planting), (2) Implementation of stable channel design/instream structure placement on the Houser property, East Birch Creek, beginning in 1998, an (3) Implementation of a joint, US Army Corps of Engineers/ODFW (cost share) project beginning in 2001 on the Brogoitti property, East Birch Creek, which involved implementation of stable channel design/construction and riparian improvement treatments.« less
ERIC Educational Resources Information Center
Peterson, Norman G., Ed.
As part of the United States Army's Project A, research has been conducted to develop and field test a battery of experimental tests to complement the Armed Services Vocational Aptitude Battery in predicting soldiers' job performance. Project A is the United States Army's large-scale manpower effort to improve selection, classification, and…
Development of a Quality Improvement Curriculum in Physician Assistant Studies.
Kindratt, Tiffany B; Orcutt, Venetia L
2017-06-01
The purpose of this project was to develop and evaluate a curriculum for physician assistant (PA) students addressing knowledge, skills, and attitudes (KSA) toward quality improvement (QI). Students (N = 77) completed a pretest rating their KSA. A curriculum was developed to improve KSA among didactic and clinical students. Two department-wide QI projects were developed for student participation. Students completed a posttest after completing curriculum components and changes in KSA had been measured. Postcurriculum implementation, QI knowledge, and skills increased significantly in most areas. Large improvements were seen in knowledge of Plan, Do, Study, Act models and life cycles of QI projects (p < .0001). Seven students (20%) participated in department-wide projects. Our curriculum model (1) was effective at improving students' QI knowledge and skills; (2) allowed students to participate in community-based QI projects; and (3) can be used by other PA programs looking to enhance their QI curriculum.
Informational open houses for the Caldecott Improvement Project.
DOT National Transportation Integrated Search
2005-06-01
The Caldecott Improvement Project proposes to alleviate traffic congestion along State : Route 24 by adding a fourth bore to the Caldecott Tunnels. Environmental studies are : being conducted to identify long-term, permanent impacts of the project as...
Masoudi, F A; Ordin, D L; Delaney, R J; Krumholz, H M; Havranek, E P
2000-01-01
This is the second in a series describing Health Care Financing Administration (HCFA) initiatives to improve care for Medicare beneficiaries with heart failure. The first article outlined the history of HCFA quality-improvement projects and current initiatives to improve care in six priority areas: heart failure, acute myocardial infarction, stroke, pneumonia, diabetes, and breast cancer. This article details the objectives and design of the Medicare National Heart Failure Quality Improvement Project (NHF), which has as its goal the improvement of inpatient heart failure care. (c)2000 by CHF, Inc.
Improving patient satisfaction with pain management using Six Sigma tools.
DuPree, Erin; Martin, Lisa; Anderson, Rebecca; Kathuria, Navneet; Reich, David; Porter, Carol; Chassin, Mark R
2009-07-01
Patient satisfaction as a direct and public measure of quality of care is changing the way hospitals address quality improvement. The feasibility of using the Six Sigma DMAIC (Define, Measure, Analyze, Improve, Control) methodology to improve patient satisfaction as it relates to pain management was evaluated. This project used the DMAIC methodology to improve patients' overall satisfaction with pain management on two inpatient units in an urban academic medical center. Pre- and postintervention patient surveys were conducted. The DMAIC methodology provided a data-driven structure to determine the optimal improvement strategies, as well as a long-term plan for maintaining any improvements. In addition, the Change Acceleration Process (CAP) was used throughout the project's various DMAIC stages to further the work of the team by creating a shared need to meet the objectives of the project. Overall satisfaction with pain management "excellent" ratings increased from 37% to 54%. Both units surpassed the goal of at least 50% of responses in the "excellent" category. Several key drivers of satisfaction with pain management were uncovered in the Analyze phase of the project, and each saw rating increases from the pre-intervention to postintervention surveys. Ongoing monitoring by the hospital inpatient satisfaction survey showed that the pain satisfaction score improved in subsequent quarters as compared with the pre-intervention period. The Six Sigma DMAIC methodology can be used successfully to improve patient satisfaction. The project led to measurable improvements in patient satisfaction with pain management, which have endured past the duration of the Six Sigma project. The Control phase of DMAIC allows the improvements to be incorporated into daily operations.
Practice quality improvement during residency: where do we stand and where can we improve?
Choudhery, Sadia; Richter, Michael; Anene, Alvin; Xi, Yin; Browning, Travis; Chason, David; Morriss, Michael Craig
2014-07-01
Completing a systems-based practice project, equivalent to a practice quality improvement project (PQI), is a residency requirement by the Accreditation Council for Graduate Medical Education and an American Board of Radiology milestone. The aim of this study was to assess the residents' perspectives on quality improvement projects in radiology. Survey data were collected from 154 trainee members of the Association of University Radiologists to evaluate the residents' views on PQI. Most residents were aware of the requirement of completing a PQI project and had faculty mentors for their projects. Residents who thought it was difficult to find a mentor were more likely to start their project later in residency (P < .0001). Publication rates were low overall, and lack of time was considered the greatest obstacle. Having dedicated time for a PQI project was associated with increased likelihood of publishing or presenting the data (P = .0091). Residents who rated the five surveyed PQI steps (coming up with an idea, finding a mentor, designing a project, finding resources, and finding time) as difficult steps were more likely to not have initiated a PQI project (P < .0001 for the first four and P = .0046 for time). We present five practical areas of improvement to make PQI a valuable learning experience: 1) Increasing awareness of PQI and providing ideas for projects, 2) encouraging faculty mentorship and publication, 3) educating residents about project design and implementation, 4) providing resources such as books and funds, and 5) allowing dedicated time. Copyright © 2014 AUR. Published by Elsevier Inc. All rights reserved.
Improving Initiation and Tracking of Research Projects at an Academic Health Center: A Case Study.
Schmidt, Susanne; Goros, Martin; Parsons, Helen M; Saygin, Can; Wan, Hung-Da; Shireman, Paula K; Gelfond, Jonathan A L
2017-09-01
Research service cores at academic health centers are important in driving translational advancements. Specifically, biostatistics and research design units provide services and training in data analytics, biostatistics, and study design. However, the increasing demand and complexity of assigning appropriate personnel to time-sensitive projects strains existing resources, potentially decreasing productivity and increasing costs. Improving processes for project initiation, assigning appropriate personnel, and tracking time-sensitive projects can eliminate bottlenecks and utilize resources more efficiently. In this case study, we describe our application of lean six sigma principles to our biostatistics unit to establish a systematic continual process improvement cycle for intake, allocation, and tracking of research design and data analysis projects. The define, measure, analyze, improve, and control methodology was used to guide the process improvement. Our goal was to assess and improve the efficiency and effectiveness of operations by objectively measuring outcomes, automating processes, and reducing bottlenecks. As a result, we developed a web-based dashboard application to capture, track, categorize, streamline, and automate project flow. Our workflow system resulted in improved transparency, efficiency, and workload allocation. Using the dashboard application, we reduced the average study intake time from 18 to 6 days, a 66.7% reduction over 12 months (January to December 2015).
Pine, Michael; Sonneborn, Mark; Schindler, Joe; Stanek, Michael; Maeda, Jared Lane; Hanlon, Carrie
2012-01-01
The imperative to achieve quality improvement and cost-containment goals is driving healthcare organizations to make better use of existing health information. One strategy, the construction of hybrid data sets combining clinical and administrative data, has strong potential to improve the cost-effectiveness of hospital quality reporting processes, improve the accuracy of quality measures and rankings, and strengthen data systems. Through a two-year contract with the Agency for Healthcare Research and Quality, the Minnesota Hospital Association launched a pilot project in 2007 to link hospital clinical information to administrative data. Despite some initial challenges, this project was successful. Results showed that the use of hybrid data allowed for more accurate comparisons of risk-adjusted mortality and risk-adjusted complications across Minnesota hospitals. These increases in accuracy represent an important step toward targeting quality improvement efforts in Minnesota and provide important lessons that are being leveraged through ongoing projects to construct additional enhanced data sets. We explore the implementation challenges experienced during the Minnesota Pilot Project and their implications for hospitals pursuing similar data-enhancement projects. We also highlight the key lessons learned from the pilot project's success.
Design-Build Highway Projects : A Review of Practices and Experiences, Final Report.
DOT National Transportation Integrated Search
2016-11-01
Texas has employed different project delivery methods in recent years in an effort to add capacity, reduce congestion, and improve the effectiveness and efficiency of the states transportation system. These transportation improvement projects are ...
Project description and crowdfunding success: an exploratory study.
Zhou, Mi Jamie; Lu, Baozhou; Fan, Weiguo Patrick; Wang, G Alan
2018-01-01
Existing research on antecedent of funding success mainly focuses on basic project properties such as funding goal, duration, and project category. In this study, we view the process by which project owners raise funds from backers as a persuasion process through project descriptions. Guided by the unimodel theory of persuasion, this study identifies three exemplary antecedents (length, readability, and tone) from the content of project descriptions and two antecedents (past experience and past expertise) from the trustworthy cue of project descriptions. We then investigate their impacts on funding success. Using data collected from Kickstarter, a popular crowdfunding platform, we find that these antecedents are significantly associated with funding success. Empirical results show that the proposed model that incorporated these antecedents can achieve an accuracy of 73 % (70 % in F-measure). The result represents an improvement of roughly 14 percentage points over the baseline model based on informed guessing and 4 percentage points improvement over the mainstream model based on basic project properties (or 44 % improvement of mainstream's performance over informed guessing). The proposed model also has superior true positive and true negative rates. We also investigate the timeliness of project data and find that old project data is gradually becoming less relevant and losing predictive power to newly created projects. Overall, this study provides evidence that antecedents identified from project descriptions have incremental predictive power and can help project owners evaluate and improve the likelihood of funding success.
ERIC Educational Resources Information Center
Dearmin, Evalyn, Ed.; And Others
Program evaluation strategies and techniques based on materials developed by the California Evaluation Improvement Project were discussed at this meeting of the Regional Interstate Planning Project (RIPP). RIPP members represent the State Departments of Education of ten western states, and have met periodically over the past nine years to discuss…
The Circle in the Spiral: Up the Down Spiral with English, Volume II.
ERIC Educational Resources Information Center
Catholic Board of Education, Diocese of Cleveland, OH.
This document reports on a project on changing and improving the teaching of English, Project Insight. This project aims to improve the instruction of English on the secondary level through an organically unified English program. Initiated by the Board of Catholic Education, the project included participants from both public and Catholic high…
ERIC Educational Resources Information Center
New York City Board of Education, Brooklyn, NY. Office of Educational Evaluation.
The Metropolitan Educational Development and Research Project (MEDARP) Documentation Unit, located in the Office of Educational Evaluation (OEE) at the New York City Board of Education, is funded by the Ford Foundation to document, evaluate and provide technical assistance to the School Improvement and Local School Development Projects; these are…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chowdhury, Farhat Jahan; Amin, A.T.M. Nurul
2006-08-15
This paper reports findings from a study on slum improvement projects to show the difference that environmental assessment (EA) can make in such interventions and to suggest mechanisms for its integration into such projects. The findings are based on a field survey that was carried out in two slums of Dhaka where infrastructure projects were implemented. In one slum, the EA process was considered in designing and locating infrastructure and in the other it was not. The survey results traced the severe problems that existed in both slums before the implementation of infrastructure improvement projects and reveal that after themore » intervention the situation has considerably improved in the slum where EA was conducted. In contrast, some problems still persist in the other slum where EA was not considered. To make it worse, the newly built infrastructures have even given rise to a set of new problems. In order to avoid such negative outcomes from development interventions, the paper finally develops the mechanism for integration of EA into slum improvement project.« less
Aveling, Emma-Louise; Zegeye, Desalegn Tegabu; Silverman, Michael
2016-08-17
Access to safe surgical care represents a critical gap in healthcare delivery and development in many low- and middle-income countries, including Ethiopia. Quality improvement (QI) initiatives at hospital level may contribute to closing this gap. Many such quality improvement initiatives are carried out through international health partnerships. Better understanding of how to optimise quality improvement in low-income settings is needed, including through partnership-based approaches. Drawing on a process evaluation of an intervention to improve surgical services in an Ethiopian hospital, this paper offers lessons to help meet this need. We conducted a qualitative process evaluation of a quality improvement project which aimed to improve access to surgical services in an Ethiopian referral hospital through better management. Data was collected longitudinally and included: 66 in-depth interviews with surgical staff and project team members; observation (135 h) in the surgery department and of project meetings; project-related documentation. Thematic analysis, guided by theoretical constructs, focused on identifying obstacles to implementation. The project largely failed to achieve its goals. Key barriers related to project design, partnership working and the implementation context, and included: confusion over project objectives and project and partner roles and responsibilities; logistical challenges concerning overseas visits; difficulties in communication; gaps between the time and authority team members had and that needed to implement and engage other staff; limited strategies for addressing adaptive-as opposed to technical-challenges; effects of hierarchy and resource scarcity on QI efforts. While many of the obstacles identified are common to diverse settings, our findings highlight ways in which some features of low-income country contexts amplify these common challenges. We identify lessons for optimising the design and planning of quality improvement interventions within such challenging healthcare contexts, with specific reference to international partnership-based approaches. These include: the need for a funded lead-in phase to clarify and agree goals, roles, mutual expectations and communication strategies; explicitly incorporating adaptive, as well as technical, solutions; transparent management of resources and opportunities; leadership which takes account of both formal and informal power structures; and articulating links between project goals and wider organisational interests.
SF Bay Water Quality Improvement Fund: Projects and Accomplishments
San Francisco Bay Water Quality Improvement Fund (SFBWQIF) projects listed here are part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.
Hina-Syeda, Hussaini; Kimbrough, Christina; Murdoch, William; Markova, Tsveti
2013-01-01
Background Quality improvement education and work in interdisciplinary teams is a healthcare priority. Healthcare systems are trying to meet core measures and provide excellent patient care, thus improving their Hospital Consumer Assessment of Healthcare Providers & Systems scores. Crittenton Hospital Medical Center in Rochester Hills, MI, aligned educational and clinical objectives, focusing on improving immunization rates against pneumonia and influenza prior to the rates being implemented as core measures. Improving immunization rates prevents infections, minimizes hospitalizations, and results in overall improved patient care. Teaching hospitals offer an effective way to work on clinical projects by bringing together the skill sets of residents, faculty, and hospital staff to achieve superior results. Methods We designed and implemented a structured curriculum in which interdisciplinary teams acquired knowledge on quality improvement and teamwork, while focusing on a specific clinical project: improving global immunization rates. We used the Lean Six Sigma process tools to quantify the initial process capability to immunize against pneumococcus and influenza. Results The hospital's process to vaccinate against pneumonia overall was operating at a Z score of 3.13, and the influenza vaccination Z score was 2.53. However, the process to vaccinate high-risk patients against pneumonia operated at a Z score of 1.96. Improvement in immunization rates of high-risk patients became the focus of the project. After the implementation of solutions, the process to vaccinate high-risk patients against pneumonia operated at a Z score of 3.9 with a defects/million opportunities rate of 9,346 and a yield of 93.5%. Revisions to the adult assessment form fixed 80% of the problems identified. Conclusions This process improvement project was not only beneficial in terms of improved quality of patient care but was also a positive learning experience for the interdisciplinary team, particularly for the residents. The hospital has completed quality improvement projects in the past; however, this project was the first in which residents were actively involved. The didactic components and experiential learning were powerfully synergistic. This and similar projects can have far-reaching implications in terms of promoting patient health and improving the quality of care delivered by the healthcare systems and teaching hospitals. PMID:24052758
Langston, Anne; Weiss, Jennifer; Landegger, Justine; Pullum, Thomas; Morrow, Melanie; Kabadege, Melene; Mugeni, Catherine; Sarriot, Eric
2014-01-01
ABSTRACT Background: The Kabeho Mwana project (2006–2011) supported the Rwanda Ministry of Health (MOH) in scaling up integrated community case management (iCCM) of childhood illness in 6 of Rwanda's 30 districts. The project trained and equipped community health workers (CHWs) according to national guidelines. In project districts, Kabeho Mwana staff also trained CHWs to conduct household-level health promotion and established supervision and reporting mechanisms through CHW peer support groups (PSGs) and quality improvement systems. Methods: The 2005 and 2010 Demographic and Health Surveys were re-analyzed to evaluate how project and non-project districts differed in terms of care-seeking for fever, diarrhea, and acute respiratory infection symptoms and related indicators. We developed a logit regression model, controlling for the timing of the first CHW training, with the district included as a fixed categorical effect. We also analyzed qualitative data from the final evaluation to examine factors that may have contributed to improved outcomes. Results: While there was notable improvement in care-seeking across all districts, care-seeking from any provider for each of the 3 conditions, and for all 3 combined, increased significantly more in the project districts. CHWs contributed a larger percentage of consultations in project districts (27%) than in non-project districts (12%). Qualitative data suggested that the PSG model was a valuable sub-level of CHW organization associated with improved CHW performance, supervision, and social capital. Conclusions: The iCCM model implemented by Kabeho Mwana resulted in greater improvements in care-seeking than those seen in the rest of the country. Intensive monitoring, collaborative supervision, community mobilization, and CHW PSGs contributed to this success. The PSGs were a unique contribution of the project, playing a critical role in improving care-seeking in project districts. Effective implementation of iCCM should therefore include CHW management and social support mechanisms. Finally, re-analysis of national survey data improved evaluation findings by providing impact estimates. PMID:25276593
77 FR 33240 - Central Valley Project Improvement Act, Water Management Plans
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-05
... Project water conservation best management practices that shall ``develop criteria for evaluating the... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...
76 FR 54251 - Central Valley Project Improvement Act, Water Management Plans
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-31
... and administer an office on Central Valley Project water conservation best management practices that... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...
78 FR 63491 - Central Valley Project Improvement Act, Water Management Plans
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-24
... Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are available for review: Westside... project contractors using best available cost-effective technology and best management practices.'' These...
75 FR 70020 - Central Valley Project Improvement Act, Water Management Plans
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-16
... office on Central Valley Project water conservation best management practices that shall ``* * * develop... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior ACTION: Notice of Availability. SUMMARY: The...
78 FR 21414 - Central Valley Project Improvement Act, Water Management Plans
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-10
... Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are available for review... establish and administer an office on Central Valley Project water conservation best management practices...
77 FR 64544 - Central Valley Project Improvement Act, Water Management Plans
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-22
... Central Valley Project water conservation best management practices that shall ``develop criteria for... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...
76 FR 12756 - Central Valley Project Improvement Act, Water Management Plans
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-08
... office on Central Valley Project water conservation best management practices that shall ``* * * develop... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...
75 FR 38538 - Central Valley Project Improvement Act, Water Management Plans
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-02
... to establish and administer an office on Central Valley Project water conservation best management... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...
COURSE AND CURRICULUM IMPROVEMENT PROFECTS--MATHEMATICS, SCIENCE, ENGINEERING.
ERIC Educational Resources Information Center
FONTAINE, THOMAS D.
ELEMENTARY, SECONDARY, AND COLLEGE LEVEL SCIENCE COURSE IMPROVEMENT PROJECTS ARE DESCRIBED. INDIVIDUAL PROJECTS ARE CLASSIFIED ACCORDING TO INSTITUTIONAL LEVEL AND ACADEMIC DISCIPLINE. MANY OF THE PROJECTS REPRESENT COMPLETE EDUCATIONAL PROGRAMS AND INCLUDE SUCH MATERIALS AS STUDENT TEXTBOOKS, LABORATORY MANUALS, SUPPLEMENTARY READINGS, TEACHER…
Efficient Project Delivery Using Lean Principles - An Indian Case Study
NASA Astrophysics Data System (ADS)
Kovvuri, P. Ramachandra Reddy; Sawhney, Anil; Ahuja, Ritu; Sreekumar, Aiswarya
2016-03-01
Construction industry in India is growing at a rapid pace. Along with this growth, the industry is facing numerous challenges that are making delivery of projects inefficient. Experts believe that capacity constraints in the industry need to be addressed immediately. Government has recommended `introduction of efficient technologies and modern management techniques' to increase the productivity of the industry. In this context, lean principles can act as a lever to make project delivery more efficient and provide the much needed impetus to the Indian construction sector. Around the globe lean principles are showing positive results on the projects. Project teams are reporting improvements in construction time, cost and quality along with softer benefits of enhanced collaboration, coordination and trust in project teams. Can adoption of lean principles provide similar benefits in the Indian construction sector? This research was conducted to answer this question. Using an action research approach a key lean construction tool called Last Planner System (LPS) was tested on a large Indian construction project. The work described in this work investigates the improvements achieved in project delivery by adopting LPS in Indian construction sector. Comparison in pre- and post-implementation data demonstrates increase in the certainty of work-flow and improves schedule compliance. This is measured through a simple LPS metric called percent plan complete. Explicit improvements in schedule performance are seen during 8 week LPS implementation along with implicit improvements in coordination, collaboration and trust in the project team. This work reports the findings of LPS implementation on the case study project outlining the barriers and drivers to adoption, strategies needed to ensure successful implementation and roadmap for implementation. Based on the findings the authors envision that lean construction can make project delivery more efficient in India.
Randell, Edward W; Short, Garry; Lee, Natasha; Beresford, Allison; Spencer, Margaret; Kennell, Marina; Moores, Zoë; Parry, David
2018-06-01
Six Sigma involves a structured process improvement strategy that places processes on a pathway to continued improvement. The data presented here summarizes a project that took three clinical laboratories from autoverification processes that allowed between about 40% to 60% of tests being auto-verified to more than 90% of tests and samples auto-verified. The project schedule, metrics and targets, a description of the previous system and detailed information on the changes made to achieve greater than 90% auto-verification is presented for this Six Sigma DMAIC (Design, Measure, Analyze, Improve, Control) process improvement project.
Building an outpatient imaging center: A case study at genesis healthcare system, part 2.
Yanci, Jim
2006-01-01
In the second of 2 parts, this article will focus on process improvement projects utilizing a case study at Genesis HealthCare System located in Zanesville, OH. Operational efficiency is a key step in developing a freestanding diagnostic imaging center. The process improvement projects began with an Expert Improvement Session (EIS) on the scheduling process. An EIS session is a facilitated meeting that can last anywhere from 3 hours to 2 days. Its intention is to take a group of people involved with the problem or operational process and work to understand current failures or breakdowns in the process. Recommendations are jointly developed to overcome any current deficiencies, and a work plan is structured to create ownership over the changes. A total of 11 EIS sessions occurred over the course of this project, covering 5 sections: Scheduling/telephone call process, Pre-registration, Verification/pre-certification, MRI throughput, CT throughput. Following is a single example of a project focused on the process improvement efforts. All of the process improvement projects utilized a quasi methodology of "DMAIC" (Define, Measure, Analyze, Improve, and Control).
Heat pipe with improved wick structures
Benson, David A.; Robino, Charles V.; Palmer, David W.; Kravitz, Stanley H.
2000-01-01
An improved planar heat pipe wick structure having projections formed by micromachining processes. The projections form arrays of interlocking, semi-closed structures with multiple flow paths on the substrate. The projections also include overhanging caps at their tops to increase the capillary pumping action of the wick structure. The capped projections can be formed in stacked layers. Another layer of smaller, more closely spaced projections without caps can also be formed on the substrate in between the capped projections. Inexpensive materials such as Kovar can be used as substrates, and the projections can be formed by electrodepositing nickel through photoresist masks.
Impact of a quality improvement project on deceased organ donor management
Olmos, Andrea; Feiner, John; Hirose, Ryutaro; Swain, Sharon; Blasi, Annabel; Roberts, John P.; Niemann, Claus U.
2017-01-01
Context Donors showed poor glucose control in the period between declaration of brain death and organ recovery. The level of hyperglycemia in the donors was associated with a decline in terminal renal function. Objective To determine whether implementation of a quality improvement project improved glucose control and preserved renal function in deceased organ donors. Methods Data collected retrospectively included demographics, medical history, mechanism of death, laboratory values, and data from the United Network for Organ Sharing. Results After implementation of the quality improvement project, deceased donors had significantly lower mean glucose concentrations (mean [SD], 162 [44] vs 212 [42] mg/dL; P < .001) and prerecovery glucose concentration (143 [66] vs 241 [69] mg/dL; P < .001). When the donor cohorts from before and after the quality improvement project were analyzed together, mean glucose concentration remained a significant predictor of terminal creatinine level (P < .001). Multivariate analysis of delayed graft function in kidney recipients matched to donors indicated that higher terminal creatinine level was associated with delayed graft function in recipients (P < .001). Conclusion The quality improvement project improved donor glucose homeostasis, and the data confirm that poor glucose homeostasis is associated with worsening terminal renal function. PMID:26645930
Improved dense trajectories for action recognition based on random projection and Fisher vectors
NASA Astrophysics Data System (ADS)
Ai, Shihui; Lu, Tongwei; Xiong, Yudian
2018-03-01
As an important application of intelligent monitoring system, the action recognition in video has become a very important research area of computer vision. In order to improve the accuracy rate of the action recognition in video with improved dense trajectories, one advanced vector method is introduced. Improved dense trajectories combine Fisher Vector with Random Projection. The method realizes the reduction of the characteristic trajectory though projecting the high-dimensional trajectory descriptor into the low-dimensional subspace based on defining and analyzing Gaussian mixture model by Random Projection. And a GMM-FV hybrid model is introduced to encode the trajectory feature vector and reduce dimension. The computational complexity is reduced by Random Projection which can drop Fisher coding vector. Finally, a Linear SVM is used to classifier to predict labels. We tested the algorithm in UCF101 dataset and KTH dataset. Compared with existed some others algorithm, the result showed that the method not only reduce the computational complexity but also improved the accuracy of action recognition.
USDA-ARS?s Scientific Manuscript database
AFRICAN GOAT IMPROVEMENT PROJECT: A FEED THE FUTURE INITIATIVE HARNESSING GENETIC DIVERSITY FOR CONSERVATION, DISEASE RESISTANCE, AND IMPROVED PRODUCTIVITY Food production systems in Africa depend heavily on the use of locally adapted animals. These animals are of agricultural, cultural, and econom...
7 CFR 4280.123 - Project eligibility.
Code of Federal Regulations, 2013 CFR
2013-01-01
... General Renewable Energy System and Energy Efficiency Improvement Guaranteed Loans § 4280.123 Project..., guaranteed loan funds may be used for necessary capital improvements to an existing renewable energy system. ... 7 Agriculture 15 2013-01-01 2013-01-01 false Project eligibility. 4280.123 Section 4280.123...
7 CFR 4280.123 - Project eligibility.
Code of Federal Regulations, 2012 CFR
2012-01-01
... General Renewable Energy System and Energy Efficiency Improvement Guaranteed Loans § 4280.123 Project..., guaranteed loan funds may be used for necessary capital improvements to an existing renewable energy system. ... 7 Agriculture 15 2012-01-01 2012-01-01 false Project eligibility. 4280.123 Section 4280.123...
7 CFR 4280.123 - Project eligibility.
Code of Federal Regulations, 2014 CFR
2014-01-01
... General Renewable Energy System and Energy Efficiency Improvement Guaranteed Loans § 4280.123 Project..., guaranteed loan funds may be used for necessary capital improvements to an existing renewable energy system. ... 7 Agriculture 15 2014-01-01 2014-01-01 false Project eligibility. 4280.123 Section 4280.123...
A quality improvement project to improve admission temperatures in very low birth weight infants.
Lee, H C; Ho, Q T; Rhine, W D
2008-11-01
To review the results of a quality improvement (QI) project to improve admission temperatures of very low birth weight inborn infants. The neonatal intensive care unit at Lucile Packard Children's Hospital underwent a QI project to address hypothermic preterm newborns by staff education and implementing processes such as polyethylene wraps and chemical warming mattresses. We performed retrospective chart review of all inborn infants with birth weight <1500 g during the 18 months prior to (n=134) and 15 months after (n=170) the implementation period. Temperatures were compared between periods. Multivariable logistic regression was used to account for potential confounding variables. We compared mortality rates and grade 3 or 4 intraventricular hemorrhage rates between periods. The mean temperature rose from 35.4 to 36.2 degrees C (P<0.0001) after the QI project. The improvement was consistent and persisted over a 15-month period. After risk adjustment, the strongest predictor of hypothermia was being born in the period before implementation of the QI project (odds ratio 8.12, 95% confidence interval 4.63, 14.22). Although cesarean delivery was a strong risk factor for hypothermia prior to the project, it was no longer significant after the project. There was no significant difference in death or intraventricular hemorrhage detected between periods. There was a significant improvement in admission temperatures after a QI project, which persisted beyond the initial implementation period. Although there was no difference in mortality or intraventricular hemorrhage rates, we did not have sufficient power to detect small differences in these outcomes.
Elementary and middle school science improvement project
NASA Technical Reports Server (NTRS)
Mcguire, Saundra Y.
1989-01-01
The Alabama A and M University Elementary and Middle School Science Improvement Project (Project SIP) was instituted to improve the science knowledge of elementary and middle school teachers using the experimental or hands-on approach. Summer workshops were conducted during the summers of 1986, 1987, and 1988 in the areas of biology, chemistry, physics, and electricity, and magnetism. Additionally, a manual containing 43 lessons which included background information, experiments and activities for classroom and home use was provided to each teacher. During the course of the project activities, the teachers interacted with various university faculty members, scientists, and NASA staff. The administrative aspects of the program, the delivery of the services to participating teachers, and the project outcome are addressed.
How to Begin a Quality Improvement Project.
Silver, Samuel A; Harel, Ziv; McQuillan, Rory; Weizman, Adam V; Thomas, Alison; Chertow, Glenn M; Nesrallah, Gihad; Bell, Chaim M; Chan, Christopher T
2016-05-06
Quality improvement involves a combined effort among health care staff and stakeholders to diagnose and treat problems in the health care system. However, health care professionals often lack training in quality improvement methods, which makes it challenging to participate in improvement efforts. This article familiarizes health care professionals with how to begin a quality improvement project. The initial steps involve forming an improvement team that possesses expertise in the quality of care problem, leadership, and change management. Stakeholder mapping and analysis are useful tools at this stage, and these are reviewed to help identify individuals who might have a vested interest in the project. Physician engagement is a particularly important component of project success, and the knowledge that patients/caregivers can offer as members of a quality improvement team should not be overlooked. After a team is formed, an improvement framework helps to organize the scientific process of system change. Common quality improvement frameworks include Six Sigma, Lean, and the Model for Improvement. These models are contrasted, with a focus on the Model for Improvement, because it is widely used and applicable to a variety of quality of care problems without advanced training. It involves three steps: setting aims to focus improvement, choosing a balanced set of measures to determine if improvement occurs, and testing new ideas to change the current process. These new ideas are evaluated using Plan-Do-Study-Act cycles, where knowledge is gained by testing changes and reflecting on their effect. To show the real world utility of the quality improvement methods discussed, they are applied to a hypothetical quality improvement initiative that aims to promote home dialysis (home hemodialysis and peritoneal dialysis). This provides an example that kidney health care professionals can use to begin their own quality improvement projects. Copyright © 2016 by the American Society of Nephrology.
How to Begin a Quality Improvement Project
Harel, Ziv; McQuillan, Rory; Weizman, Adam V.; Thomas, Alison; Chertow, Glenn M.; Nesrallah, Gihad; Bell, Chaim M.; Chan, Christopher T.
2016-01-01
Quality improvement involves a combined effort among health care staff and stakeholders to diagnose and treat problems in the health care system. However, health care professionals often lack training in quality improvement methods, which makes it challenging to participate in improvement efforts. This article familiarizes health care professionals with how to begin a quality improvement project. The initial steps involve forming an improvement team that possesses expertise in the quality of care problem, leadership, and change management. Stakeholder mapping and analysis are useful tools at this stage, and these are reviewed to help identify individuals who might have a vested interest in the project. Physician engagement is a particularly important component of project success, and the knowledge that patients/caregivers can offer as members of a quality improvement team should not be overlooked. After a team is formed, an improvement framework helps to organize the scientific process of system change. Common quality improvement frameworks include Six Sigma, Lean, and the Model for Improvement. These models are contrasted, with a focus on the Model for Improvement, because it is widely used and applicable to a variety of quality of care problems without advanced training. It involves three steps: setting aims to focus improvement, choosing a balanced set of measures to determine if improvement occurs, and testing new ideas to change the current process. These new ideas are evaluated using Plan-Do-Study-Act cycles, where knowledge is gained by testing changes and reflecting on their effect. To show the real world utility of the quality improvement methods discussed, they are applied to a hypothetical quality improvement initiative that aims to promote home dialysis (home hemodialysis and peritoneal dialysis). This provides an example that kidney health care professionals can use to begin their own quality improvement projects. PMID:27016497
Rebuilding Habitat and Shoreline Resilience through Improved Flood Control Project
Information about the SFBWQP Rebuilding Habitat and Shoreline Resilience through Improved Flood Control Project, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.
Abilene Metropolitan Area Transportation Improvement Program Fiscal Years 1996-1998
DOT National Transportation Integrated Search
1995-11-30
This document contains a prioritized list of surface transportation improvement : projects which are expected to begin in the next three years. These projects are : planned to develop, improve, and maintain an integrated transportation system : for t...
Improving transition of care for veterans after total joint replacement.
Green, Uthona R; Dearmon, Valorie; Taggart, Helen
2015-01-01
Patients transitioning from hospital to home are at risk for readmission to the hospital. Readmissions are costly and occur too often. Standardized discharge education processes have shown to decrease readmissions. The purpose of this quality improvement project was to utilize evidence-based practice changes to decrease 30-day all-cause readmissions after total joint replacement. Review of literature revealed that improved discharge education can decrease unnecessary readmissions after discharge. A quality improvement project was developed including standardized total joint replacement discharge education, teach-back education methodology, and improved postdischarge telephone follow-up. The quality improvement project was initiated and outcomes were evaluated. Improving coordination of the discharge process, enhanced education for patients/caregivers, and postdischarge follow-up decreased total joint replacement readmissions.
BEMRP: Conducting research, sharing results
Greg Jones
2007-01-01
A couple of years ago the Bitterroot National Forest began planning the Trapper Bunkhouse Land Stewardship Project (Trapper-Bunkhouse Project). This project includes fuels reduction, watershed improvements, noncommercial thinning in plantations to improve resiliency to insects and disease, and commercial timber harvest to provide economic value to the community and...
1979-1981 Vocational Education Improvement Projects.
ERIC Educational Resources Information Center
Connecticut State Dept. of Education, Hartford. Div. of Vocational Education.
This brochure provides summaries of 23 exemplary, research, and curriculum projects known as the Vocational Improvement Program that share three concerns: meeting needs of underserved students, sex fairness, and excellence in vocational education. The 14 exemplary projects focus on vocational exploration and skill building in marine and related…
DOT National Transportation Integrated Search
2009-07-01
The federal-aid highway program : provides about $33 billion a year to : states for highway projects. The : federal government provides : funding for and oversees this : program, while states largely : choose and manage the projects. : As requested, ...
Recruitment and retention. The Derby Theatre Project experience.
Ainsworth, David
2003-10-01
The National Theatre Project was set up in March 2001 by the Modernisation Agency to improve the patient and carer experience, improve employee satisfaction, optimise theatre utilisation and reduce cancelled operations. This is the second article in the series where David Ainsworth, manager of a pilot site project in Derby, describes issues around the Theatre Project. This month the focus is on recruitment, retention and staff morale.
Avoiding failure: tools for successful and sustainable quality-improvement projects.
Donnelly, Lane F
2017-06-01
Involvement in successful and sustained quality improvement can be a very rewarding experience. However, it can be very difficult work. Up to 70% of attempted organizational change is not sustained. There are many reasons why quality-improvement projects might not be successful. In this article, the author reviews items associated with an increased or decreased likelihood of success. Such items have been categorized as structural issues, human issues and environmental context. This paper is intended to serve those embarking on quality-improvement projects as a resource to help position them for success.
Schleiff, Meike; Kumapley, Richard; Freeman, Paul A; Gupta, Sundeep; Rassekh, Bahie M; Perry, Henry B
2017-06-01
The degree to which investments in health programs improve the health of the most disadvantaged segments of the population-where utilization of health services and health status is often the worst-is a growing concern throughout the world. Therefore, questions about the degree to which community-based primary health care (CBPHC) can or actually does improve utilization of health services and the health status of the most disadvantaged children in a population is an important one. Using a database containing information about the assessment of 548 interventions, projects or programs (referred to collectively as projects) that used CBPHC to improve child health, we extracted evidence related to equity from a sub-set of 42 projects, identified through a multi-step process, that included an equity analysis. We organized our findings conceptually around a logical framework matrix. Our analysis indicates that these CBPHC projects, all of which implemented child health interventions, achieved equitable effects. The vast majority (87%) of the 82 equity measurements carried out and reported for these 42 projects demonstrated "pro-equitable" or "equitable" effects, meaning that the project's equity indicator(s) improved to the same degree or more in the disadvantaged segments of the project population as in the more advantaged segments. Most (78%) of the all the measured equity effects were "pro-equitable," meaning that the equity criterion improved more in the most disadvantaged segment of the project population than in the other segments of the population. Based on the observation that CBPHC projects commonly provide services that are readily accessible to the entire project population and that even often reach down to all households, such projects are inherently likely to be more equitable than projects that strengthen services only at facilities, where utilization diminishes greatly with one's distance away. The decentralization of services and attention to and tracking of metrics across all phases of project implementation with attention to the underserved, as can be done in CBPHC projects, are important for reducing inequities in countries with a high burden of child mortality. Strengthening CBPHC is a necessary strategy for reducing inequities in child health and for achieving universal coverage of essential services for children.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Compo, Gilbert P
As an important step toward a coupled data assimilation system for generating reanalysis fields needed to assess climate model projections, the Ocean Atmosphere Coupled Reanalysis for Climate Applications (OARCA) project assesses and improves the longest reanalyses currently available of the atmosphere and ocean: the 20th Century Reanalysis Project (20CR) and the Simple Ocean Data Assimilation with sparse observational input (SODAsi) system, respectively. In this project, we make off-line but coordinated improvements in the 20CR and SODAsi datasets, with improvements in one feeding into improvements of the other through an iterative generation of new versions. These datasets now span from themore » 19th to 21st centuries. We then study the extreme weather and variability from days to decades of the resulting datasets. A total of 24 publications have been produced in this project.« less
Projecting effects of improvements in passive safety of the New Zealand light vehicle fleet.
Keall, Michael; Newstead, Stuart; Jones, Wayne
2007-09-01
In the year 2000, as part of the process for setting New Zealand road safety targets, a projection was made for a reduction in social cost of 15.5 percent associated with improvements in crashworthiness, which is a measure of the occupant protection of the light passenger vehicle fleet. Since that document was produced, new estimates of crashworthiness have become available, allowing for a more accurate projection. The objective of this paper is to describe a methodology for projecting changes in casualty rates associated with passive safety features and to apply this methodology to produce a new prediction. The shape of the age distribution of the New Zealand light passenger vehicle fleet was projected to 2010. Projected improvements in crashworthiness and associated reductions in social cost were also modeled based on historical trends. These projections of changes in the vehicle fleet age distribution and of improvements in crashworthiness together provided a basis for estimating the future performance of the fleet in terms of secondary safety. A large social cost reduction of about 22 percent for 2010 compared to the year 2000 was predicted due to the expected huge impact of improvements in passive vehicle features on road trauma in New Zealand. Countries experiencing improvements in their vehicle fleets can also expect significant reductions in road injury compared to a less crashworthy passenger fleet. Such road safety gains can be analyzed using some of the methodology described here.
San Pablo Bay Tidal Marsh Enhancement and Water Quality Improvement Project
Information about the SFBWQP San Pablo Bay Tidal Marsh Enhancement and Water Quality Improvement Project, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.
Schepman, Sanneke; Valentijn, Pim; Bruijnzeels, Marc; Maaijen, Marlies; de Bakker, Dinny; Batenburg, Ronald; de Bont, Antoinette
2018-06-07
The need for organisational development in primary care has increased as it is accepted as a means of curbing rising costs and responding to demographic transitions. It is only within such inter-organisational networks that small-scale practices can offer treatment to complex patients and continuity of care. The aim of this paper is to explore, through the experience of professionals and patients, whether, and how, project management and network governance can improve the outcomes of projects which promote inter-organisational collaboration in primary care. This paper describes a study of projects aimed at improving inter-organisational collaboration in Dutch primary care. The projects' success in project management and network governance was monitored by interviewing project leaders and board members on the one hand, and improvement in the collaboration by surveying professionals and patients on the other. Both qualitative and quantitative methods were applied to assess the projects. These were analysed, finally, using multi-level models in order to account for the variation in the projects, professionals and patients. Successful network governance was associated positively with the professionals' satisfaction with the collaboration; but not with improvements in the quality of care as experienced by patients. Neither patients nor professionals perceived successful project management as associated with the outcomes of the collaboration projects. This study shows that network governance in particular makes a difference to the outcomes of inter-organisational collaboration in primary care. However, project management is not a predictor for successful inter-organisational collaboration in primary care.
Blouin-Delisle, Charles Hubert; Drolet, Renee; Gagnon, Serge; Turcotte, Stephane; Boutet, Sylvie; Coulombe, Martin; Daneau, Eric
2018-03-12
Purpose The purpose of this paper is to increase efficiency in ORs without affecting quality of care by improving the workflow processes. Administrative processes independent of the surgical act can be challenging and may lead to clinical impacts such as increasing delays. The authors hypothesized that a Lean project could improve efficiency of surgical processes by reducing the length of stays in the recovery ward. Design/methodology/approach Two similar Lean projects were performed in the surgery departments of two hospitals of the Centre Hospitalier Universitaire de Québec: Hôtel Dieu de Quebec (HDQ) and Hôpital de l'Enfant Jesus (HEJ). The HDQ project designed around a Define, Measure, Analyse, Improve and Control process revision and a Kaizen workshop focused on patients who were hospitalized in a specific care unit after surgery and the HEJ project targeted patients in a post-operative ambulatory context. The recovery ward output delay was measured retrospectively before and after project. Findings For the HDQ Lean project, wasted time in the recovery ward was reduced by 62 minutes (68 percent reduction) between the two groups. The authors also observed an increase of about 25 percent of all admissions made in the daytime after the project compared to the time period before the project. For the HEJ Lean project, time passed in the recovery ward was reduced by 6 min (29 percent reduction). Originality/value These projects produced an improvement in the flow of the OR without targeting clinical practices in the OR itself. They demonstrated that change in administrative processes can have a great impact on the flow of clinical pathways and highlight the need for comprehensive and precise monitoring of every step of the elective surgery patient trajectory.
Improving Project Management Using Formal Models and Architectures
NASA Technical Reports Server (NTRS)
Kahn, Theodore; Sturken, Ian
2011-01-01
This talk discusses the advantages formal modeling and architecture brings to project management. These emerging technologies have both great potential and challenges for improving information available for decision-making. The presentation covers standards, tools and cultural issues needing consideration, and includes lessons learned from projects the presenters have worked on.
WINS: Workplace Improvement of Necessary Skills. Final Report.
ERIC Educational Resources Information Center
Dwyer, Ann
The Workplace Improvement of Necessary Skills (WINS) project was initiated by a statewide coalition of Washington businesses and educational institutions to prepare workers in a number of high-performance workplaces to participate fully in their work environments. Together, the project's 11 sites served 872 participants. All project instructors…
Ovretveit, John; Mittman, Brian; Rubenstein, Lisa; Ganz, David A
2017-10-09
Purpose The purpose of this paper is to enable improvers to use recent knowledge from implementation science to carry out improvement changes more effectively. It also highlights the importance of converting research findings into practical tools and guidance for improvers so as to make research easier to apply in practice. Design/methodology/approach This study provides an illustration of how a quality improvement (QI) team project can make use of recent findings from implementation research so as to make their improvement changes more effective and sustainable. The guidance is based on a review and synthesis of improvement and implementation methods. Findings The paper illustrates how research can help a quality project team in the phases of problem definition and preparation, in design and planning, in implementation, and in sustaining and spreading a QI. Examples of the use of different ideas and methods are cited where they exist. Research limitations/implications The example is illustrative and there is little limited experimental evidence of whether using all the steps and tools in the one approach proposed do enable a quality team to be more effective. Evidence supporting individual guidance proposals is cited where it exists. Practical implications If the steps proposed and illustrated in the paper were followed, it is possible that quality projects could avoid waste by ensuring the conditions they need for success are in place, and sustain and spread improvement changes more effectively. Social implications More patients could benefit more quickly from more effective implementation of proven interventions. Originality/value The paper is the first to describe how improvement and implementation science can be combined in a tangible way that practical improvers can use in their projects. It shows how QI project teams can take advantage of recent advances in improvement and implementation science to make their work more effective and sustainable.
Domains associated with successful quality improvement in healthcare - a nationwide case study.
Brandrud, Aleidis Skard; Nyen, Bjørnar; Hjortdahl, Per; Sandvik, Leiv; Helljesen Haldorsen, Gro Sævil; Bergli, Maria; Nelson, Eugene C; Bretthauer, Michael
2017-09-13
There is a distinct difference between what we know and what we do in healthcare: a gap that is impairing the quality of the care and increasing the costs. Quality improvement efforts have been made worldwide by learning collaboratives, based on recognized continual improvement theory with limited scientific evidence. The present study of 132 quality improvement projects in Norway explores the conditions for improvement from the perspectives of the frontline healthcare professionals, and evaluates the effectiveness of the continual improvement method. An instrument with 25 questions was developed on prior focus group interviews with improvement project members who identified features that may promote or inhibit improvement. The questionnaire was sent to 189 improvement projects initiated by the Norwegian Medical Association, and responded by 70% (132) of the improvement teams. A sub study of their final reports by a validated instrument, made us able to identify the successful projects and compare their assessments with the assessments of the other projects. A factor analysis with Varimax rotation of the 25 questions identified five domains. A multivariate regression analysis was used to evaluate the association with successful quality improvements. Two of the five domains were associated with success: Measurement and Guidance (p = 0.011), and Professional environment (p = 0.015). The organizational leadership domain was not associated with successful quality improvements (p = 0.26). Our findings suggest that quality improvement projects with good guidance and focus on measurement for improvement have increased likelihood of success. The variables in these two domains are aligned with improvement theory and confirm the effectiveness of the continual improvement method provided by the learning collaborative. High performing professional environments successfully engaged in patient-centered quality improvement if they had access to: (a) knowledge of best practice provided by professional subject matter experts, (b) knowledge of current practice provided by simple measurement methods, assisted by (c) improvement knowledge experts who provided useful guidance on measurement, and made the team able to organize the improvement efforts well in spite of the difficult resource situation (time and personnel). Our findings may be used by healthcare organizations to develop effective infrastructure to support improvement and to create the conditions for making quality and safety improvement a part of everyone's job.
Impact of a competency based curriculum on quality improvement among internal medicine residents.
Fok, Mark C; Wong, Roger Y
2014-11-28
Teaching quality improvement (QI) principles during residency is an important component of promoting patient safety and improving quality of care. The literature on QI curricula for internal medicine residents is limited. We sought to evaluate the impact of a competency based curriculum on QI among internal medicine residents. This was a prospective, cohort study over four years (2007-2011) using pre-post curriculum comparison design in an internal medicine residency program in Canada. Overall 175 post-graduate year one internal medicine residents participated. A two-phase, competency based curriculum on QI was developed with didactic workshops and longitudinal, team-based QI projects. The main outcome measures included self-assessment, objective assessment using the Quality Improvement Knowledge Assessment Tool (QIKAT) scores to assess QI knowledge, and performance-based assessment via presentation of longitudinal QI projects. Overall 175 residents participated, with a response rate of 160/175 (91%) post-curriculum and 114/175 (65%) after conducting their longitudinal QI project. Residents' self-reported confidence in making changes to improve health increased and was sustained at twelve months post-curriculum. Self-assessment scores of QI skills improved significantly from pre-curriculum (53.4 to 69.2 percent post-curriculum [p-value 0.002]) and scores were sustained at twelve months after conducting their longitudinal QI projects (53.4 to 72.2 percent [p-value 0.005]). Objective scores using the QIKAT increased post-curriculum from 8.3 to 10.1 out of 15 (p-value for difference <0.001) and this change was sustained at twelve months post-project with average individual scores of 10.7 out of 15 (p-value for difference from pre-curriculum <0.001). Performance-based assessment occurred via presentation of all projects at the annual QI Project Podium Presentation Day. The competency based curriculum on QI improved residents' QI knowledge and skills during residency training. Importantly, residents perceived that their QI knowledge improved after the curriculum and this also correlated to improved QIKAT scores. Experiential QI project work appeared to contribute to sustaining QI knowledge at twelve months.
DOT National Transportation Integrated Search
2017-08-01
The Highway Safety Improvement Program (HSIP) aims to achieve a reduction in the number and severity of fatalities and serious injury crashes on all public roads by implementing highway safety improvement projects. Although the structure and main com...
Competitiveness Improvement Project Informational Workshop
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sinclair, Karin C; Preus, Robert W; Dana, Scott
This presentation was given at the Competitiveness Improvement Project (CIP) Informational Workshop on December 6, 2017. Topics covered during the workshop include an overview of the CIP, past projects, scoring criteria, technical support opportunities, certification body requirements, standards applicable to distributed wind generators, information on the National Electric Code, certification testing requirements, test site requirements, National Environmental Policy Act, design review, levelized cost of energy, procurement/contracting, project management/deliverables, and outreach materials.
Larson, David B; Mickelsen, L Jake; Garcia, Kandice
2016-01-01
Performance improvement in a complex health care environment depends on the cooperation of diverse individuals and groups, allocation of time and resources, and use of effective improvement methods. To address this challenge, we developed an 18-week multidisciplinary training program that would also provide a vehicle for effecting needed improvements, by using a team- and project-based model. The program began in the radiology department and subsequently expanded to include projects from throughout the medical center. Participants were taught a specific method for team-based problem solving, which included (a) articulating the problem, (b) observing the process, (c) analyzing possible causes of problems, (d) identifying key drivers, (e) testing and refining interventions, and (f) providing for sustainment of results. Progress was formally reviewed on a weekly basis. A total of 14 teams consisting of 78 participants completed the course in two cohorts; one project was discontinued. All completed projects resulted in at least modest improvement. Mean skill scores increased from 2.5/6 to 4.5/6 (P < .01), and the mean satisfaction score was 4.7/5. Identified keys to success include (a) engagement of frontline staff, (b) teams given authority to make process changes, (c) capable improvement coaches, (d) a physician-director with improvement expertise and organizational authority, (e) capable administrative direction, (f) supportive organizational leaders, (g) weekly progress reviews, (h) timely educational material, (i) structured problem-solving methods, and ( j ) multiple projects working simultaneously. The purpose of this article is to review the program, including the methods and results, and discuss perceived keys to program success. © RSNA, 2016.
Gerrein, Betsy T; Williams, Christina E; Von Allmen, Daniel
2013-01-01
Formal quality-improvement (QI) projects require that participants are educated in QI methods to provide them with the capability to carry out successful, meaningful work. However, orchestrating a portfolio of projects that addresses the strategic mission of the institution requires an extension of basic QI training to provide the division or business unit with the capacity to successfully develop and manage the portfolio. Advanced Improvement Leadership Systems is a program to help units create a meaningful portfolio. This program, used by the Division of Pediatric General and Thoracic Surgery at Cincinnati Children's Hospital Medical Center, helped establish a portfolio of targeted QI projects designed to achieve outstanding outcomes at competitive costs in multiple clinical areas aligned with the institution's strategic goals (improve disease-based outcomes, patient safety, flow, and patient and family experience). These objectives are addressed in an institutional strategic plan built around 5 core areas: Safety, Productivity, Care Coordination and Outcomes, Patient and Family Experience, and Value. By combining the portfolio of QI projects with improvements in the divisional infrastructure, effective improvement efforts were realized throughout the division. In the 9 months following the program, divisional capability resulted in a 16.5% increase (5.7% to 22.2%) of formally trained staff working on 10 QI teams. Concurrently, a leadership team, designed to coordinate projects, remove barriers, and provide technical support, provided the capacity to pursue this ongoing effort. The Advanced Improvement Leadership Systems program increased the Division's efficiency and effectiveness in pursing the QI mission that is integral at our hospital.
Gerrein, Betsy T; Williams, Christina E; von Allmen, Daniel
2013-01-01
Formal quality-improvement (QI) projects require that participants are educated in QI methods to provide them with the capability to carry out successful, meaningful work. However, orchestrating a portfolio of projects that addresses the strategic mission of the institution requires an extension of basic QI training to provide the division or business unit with the capacity to successfully develop and manage the portfolio. Advanced Improvement Leadership Systems is a program to help units create a meaningful portfolio. This program, used by the Division of Pediatric General and Thoracic Surgery at Cincinnati Children’s Hospital Medical Center, helped establish a portfolio of targeted QI projects designed to achieve outstanding outcomes at competitive costs in multiple clinical areas aligned with the institution’s strategic goals (improve disease-based outcomes, patient safety, flow, and patient and family experience). These objectives are addressed in an institutional strategic plan built around 5 core areas: Safety, Productivity, Care Coordination and Outcomes, Patient and Family Experience, and Value. By combining the portfolio of QI projects with improvements in the divisional infrastructure, effective improvement efforts were realized throughout the division. In the 9 months following the program, divisional capability resulted in a 16.5% increase (5.7% to 22.2%) of formally trained staff working on 10 QI teams. Concurrently, a leadership team, designed to coordinate projects, remove barriers, and provide technical support, provided the capacity to pursue this ongoing effort. The Advanced Improvement Leadership Systems program increased the Division’s efficiency and effectiveness in pursing the QI mission that is integral at our hospital. PMID:24361020
Improving nutritional status in a pediatric cystic fibrosis center.
Ramírez, Ixsy; Filbrun, Amy; Hasan, Aws; Kidwell, Kelley M; Nasr, Samya Z
2015-06-01
The nutritional status of patients with cystic fibrosis (CF) is strongly associated with pulmonary function, respiratory status and survival. Malnutrition could result from a discrepancy between energy needs and food intake while malabsorption results from pancreatic insufficiency which occurs in 85% of people with CF. A quality improvement (QI) project was designed to improve the nutritional status of patients with CF with low Body Mass Index (BMI) between 3 and 19 years of age. An algorithm was developed which included clinic-based assessments of patients' nutritional status and periodic assessment by a dietitian, social worker and/or psychologist during the project. Gastrostomy tube placement and feeding was offered as a last resort to improve caloric intake. 173 patients seen during January-June, 2010, were included in this project. They were classified into four BMI groups and data were collected quarterly through June, 2012. The project target population (BMI percentile ≤ 24) had a median BMI percentile at the start of the project of 11.8. At the end of the project median BMI percentile was 22 (46% improvement). Improving nutrition and BMI for patients with CF is achievable. There must be a motivated, multi-disciplinary team that includes patients and families. A patient-specific combination of interventions must be used. These interventions could be quite basic for patients with BMI percentile ≥ 25, yet more elaborate for patients with BMI percentile <25. Clinic-based algorithms such as ours can successfully improve the BMI percentile in patients with CF. © 2014 Wiley Periodicals, Inc.
Sellers, Morgan M; Hanson, Kristi; Schuller, Mary; Sherman, Karen; Kelz, Rachel R; Fryer, Jonathan; DaRosa, Debra; Bilimoria, Karl Y
2013-06-01
As patient-safety and quality efforts spread throughout health care, the need for physician involvement is critical, yet structured training programs during surgical residency are still uncommon. Our objective was to develop an extended quality-improvement curriculum for surgical residents that included formal didactics and structured practical experience. Surgical trainees completed an 8-hour didactic program in quality-improvement methodology at the start of PGY3. Small teams developed practical quality-improvement projects based on needs identified during clinical experience. With the assistance of the hospital's process-improvement team and surgical faculty, residents worked through their selected projects during the following year. Residents were anonymously surveyed after their participation to assess the experience. During the first 3 years of the program, 17 residents participated, with 100% survey completion. Seven quality-improvement projects were developed, with 57% completing all DMAIC (Define, Measure, Analyze, Improve, Control) phases. Initial projects involved issues of clinical efficiency and later projects increasingly focused on clinical care questions. Residents found the experience educationally important (65%) and believed they were well equipped to lead similar initiatives in the future (70%). Based on feedback, the timeline was expanded from 12 to 24 months and changed to start in PGY2. Developing an extended curriculum using both didactic sessions and applied projects to teach residents the theory and implementation of quality improvement is possible and effective. It addresses the ACGME competencies of practice-based improvement and learning and systems-based practice. Our iterative experience during the past 3 years can serve as a guide for other programs. Copyright © 2013 American College of Surgeons. Published by Elsevier Inc. All rights reserved.
76 FR 33589 - Standards Improvement Project-Phase III
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-08
... rule: I. Background A. Introduction B. Regulatory History II. Legal Considerations III. Summary and... without diminishing worker protections. B. Regulatory History The Standards Improvement Project (SIP...
Projection display technologies for the new millennium
NASA Astrophysics Data System (ADS)
Kahn, Frederic J.
2000-04-01
Although analog CRTs continue to enable most of the world's electronic projection displays such as US consumer rear projection televisions, discrete pixel (digital) active matrix LCD and DLP reflective mirror array projectors have rapidly created large nonconsumer markets--primarily for business. Recent advances in image quality, compactness and cost effectiveness of digital projectors have the potential to revolutionize major consumer and entertainment markets as well. Digital penetration of the mainstream consumer projection TV market will begin in the hear 2000. By 2005 digital projection HDTVs could take the major share of the consumer HDTV projection market. Digital projection is expected to dominate both the consumer HDTV and the cinema market by 2010, resulting in potential shipments for all projection markets exceeding 10 M units per year. Digital projection is improving at a rate 10X faster than analog CRT projectors and 5X faster than PDP flat panels. Continued rapid improvement of digital projection is expected due to its relative immaturity and due to the wide diversity of technological improvements being pursued. Key technology enablers are the imaging panels, light sources and micro-optics. Market shares of single panel projectors, MEMs panels, LCOS panels and low T p-Si TFT LCD panel variants are expected to increase.
Wilper, Andrew P; Smith, Curtis Scott; Weppner, William
2013-09-16
The Accreditation Council for Graduate Medical Education (ACGME) requires that training programs integrate system-based practice (SBP) and practice-based learning and improvement (PBLI) into internal medicine residency curricula. CONTEXT AND SETTING: We instituted a seminar series and year-long-mentored curriculum designed to engage internal medicine residents in these competencies. Residents participate in a seminar series that includes assigned reading and structured discussion with faculty who assist in the development of quality improvement or research projects. Residents pursue projects over the remainder of the year. Monthly works in progress meetings, protected time for inquiry, and continued faculty mentorship guide the residents in their project development. Trainees present their work at hospital-wide grand rounds at the end of the academic year. We performed a survey of residents to assess their self-reported knowledge, attitudes and skills in SBP and PBLI. In addition, blinded faculty scored projects for appropriateness, impact, and feasibility. We measured resident self-reported knowledge, attitudes, and skills at the end of the academic year. We found evidence that participants improved their understanding of the context in which they were practicing, and that their ability to engage in quality improvement projects increased. Blinded faculty reviewers favorably ranked the projects' feasibility, impact, and appropriateness. The 'Curriculum of Inquiry' generated 11 quality improvement and research projects during the study period. Barriers to the ongoing work include a limited supply of mentors and delays due to Institutional Review Board approval. Hospital leadership recognizes the importance of the curriculum, and our accreditation manager now cites our ongoing work. A structured residency-based curriculum facilitates resident demonstration of SBP and practice-based learning and improvement. Residents gain knowledge and skills though this enterprise and hospitals gain access to trainees who help to solve ongoing problems and meet accreditation requirements.
Schleiff, Meike; Kumapley, Richard; Freeman, Paul A; Gupta, Sundeep; Rassekh, Bahie M; Perry, Henry B
2017-01-01
Background The degree to which investments in health programs improve the health of the most disadvantaged segments of the population—where utilization of health services and health status is often the worst—is a growing concern throughout the world. Therefore, questions about the degree to which community–based primary health care (CBPHC) can or actually does improve utilization of health services and the health status of the most disadvantaged children in a population is an important one. Methods Using a database containing information about the assessment of 548 interventions, projects or programs (referred to collectively as projects) that used CBPHC to improve child health, we extracted evidence related to equity from a sub–set of 42 projects, identified through a multi–step process, that included an equity analysis. We organized our findings conceptually around a logical framework matrix. Results Our analysis indicates that these CBPHC projects, all of which implemented child health interventions, achieved equitable effects. The vast majority (87%) of the 82 equity measurements carried out and reported for these 42 projects demonstrated “pro–equitable” or “equitable” effects, meaning that the project’s equity indicator(s) improved to the same degree or more in the disadvantaged segments of the project population as in the more advantaged segments. Most (78%) of the all the measured equity effects were “pro–equitable,” meaning that the equity criterion improved more in the most disadvantaged segment of the project population than in the other segments of the population. Conclusions Based on the observation that CBPHC projects commonly provide services that are readily accessible to the entire project population and that even often reach down to all households, such projects are inherently likely to be more equitable than projects that strengthen services only at facilities, where utilization diminishes greatly with one’s distance away. The decentralization of services and attention to and tracking of metrics across all phases of project implementation with attention to the underserved, as can be done in CBPHC projects, are important for reducing inequities in countries with a high burden of child mortality. Strengthening CBPHC is a necessary strategy for reducing inequities in child health and for achieving universal coverage of essential services for children. PMID:28685043
Waits, Seth A; Reames, Bradley N; Krell, Robert W; Bryner, Benjamin; Shih, Terry; Obi, Andrea T; Henke, Peter K; Minter, Rebecca M; Englesbe, Michael J; Wong, Sandra L
2014-01-01
To meet the Accreditation Council for Graduate Medical Education core competency in Practice-Based Learning and Improvement, educational curricula need to address training in quality improvement (QI). We sought to establish a program to train residents in the principles of QI and to provide practical experiences in developing and implementing improvement projects. We present a novel approach for engaging students, residents, and faculty in QI efforts-Team Action Projects in Surgery (TAPS). Large academic medical center and health system. Multiple teams consisting of undergraduate students, medical students, surgery residents, and surgery faculty were assembled and QI projects developed. Using "managing to learn" Lean principles, these multilevel groups approached each project with robust data collection, development of an A3, and implementation of QI activities. A total of 5 resident led QI projects were developed during the TAPS pilot phase. These included a living kidney donor enhanced recovery protocol, consult improvement process, venous thromboembolism prophylaxis optimization, Clostridium difficile treatment standardization, and understanding variation in operative duration of laparoscopic cholecystectomy. Qualitative and quantitative assessment showed significant value for both the learner and stakeholders of QI related projects. Through the development of TAPS, we demonstrate a novel approach to addressing the increasing focus on QI within graduate medical education. Efforts to expand this multilevel team based approach would have value for teachers and learners alike. Copyright © 2014. Published by Elsevier Inc.
ERIC Educational Resources Information Center
McKeag, Janis; Todd, Laurie
The Environmental Improvement Project at Hudson Bay Mining and Smelting in Flin Flon, Manitoba, presented a unique opportunity for field observation and assessment. Field observation of the approximately 70 carpenters employed with various companies provided information on the types of communication used and the circumstances in which the…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bryan, Frank; Dennis, John; MacCready, Parker
This project aimed to improve long term global climate simulations by resolving and enhancing the representation of the processes involved in the cycling of freshwater through estuaries and coastal regions. This was a collaborative multi-institution project consisting of physical oceanographers, climate model developers, and computational scientists. It specifically targeted the DOE objectives of advancing simulation and predictive capability of climate models through improvements in resolution and physical process representation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bryan, Frank; Dennis, John; MacCready, Parker
This project aimed to improve long term global climate simulations by resolving and enhancing the representation of the processes involved in the cycling of freshwater through estuaries and coastal regions. This was a collaborative multi-institution project consisting of physical oceanographers, climate model developers, and computational scientists. It specifically targeted the DOE objectives of advancing simulation and predictive capability of climate models through improvements in resolution and physical process representation.
Oregon Alliance for Program Improvement: 1989-90 Report.
ERIC Educational Resources Information Center
Dunham, Daniel B.
This annual report describes five projects of the Oregon Alliance for Program Improvement, which provides work-relevant education and training services in leadership, professional competence, and organizational effectiveness. First is an aggregated report of nearly 30 vocational education program improvement field study projects conducted between…
Evaluation of the Corridor Safety Improvement Program : phase 1 final report.
DOT National Transportation Integrated Search
1997-09-01
This project is an analysis of Oregon's Corridor Safety Improvement Programs implemented on Oregon Route 22 and Oregon Route 34. Improvements were : made along each corridor in 1993. : The project used a mail-out survey to determine the level of awar...
Incremental Improvement of Career Education in Utah. Final Report.
ERIC Educational Resources Information Center
Utah State Board of Education, Salt Lake City.
This is a project report on Utah's plans to effect "incremental improvements" in career education implementation in seven school districts. Project objectives are formulated as follow: effect incremental improvements in attendance area cones, strengthen career education leadership capabilities, develop staff competence to diffuse the…
ERIC Educational Resources Information Center
Corbitt, Brian
1998-01-01
Describes two action research projects undertaken at an Australian university to improve quality of services to foreign students and improve the institution's image through word of mouth, or informal marketing. Each project, although small, facilitated changes or improvements to a targeted service. The role of management in empowering employees…
Dujardin, Pierre-Philippe; Reverdy, Thomas; Valette, Annick; François, Patrice
2016-06-01
Introduction : project management is on the expected proficiencies for head nurses. Context : The work on the organizations’ improvement carried out by head nurses, is rarely covered in the literature. Objectives : to follow the implementation of actions from projects led by head nurses and to analyze the parameters of success. Method : for a year, an intervention study has followed 17 projects initiating improvement measures. Semistructured interviews were conducted with health-care teams and managers. All of them reported the results of the implementation of each measure as an operational improvement. A mixed analysis containing a logistic regression investigated associations between the result of the action and the various contextual characteristics. Results : this study involved 111 actions. 71 % of them concluded an operational improvement. The organizational and supporting actions had a high success rate, which decreased when hazards were not managed by healthcare managers. Discussion : this study highlights the place of strategies through the implementing methods and the chosen actions. Recommendations are made in order to promote a collective assessment. Conclusion : scientific approaches are proposed to discuss the organizational work.
NASA Technical Reports Server (NTRS)
Lim, Christopher Yit-Seong; Klein, Janice
2004-01-01
In the summer of 2001, NASA and Ford Motor Company co-sponsored a research project aimed at improving the education process and application of lessons learned through distant education. The System Design & Management Program (SDM) was used as a laboratory for improving distance learning capabilities. The research project was a follow up to previous research on globally dispersed teams.
Preventing Stalled Quality Improvement Teams: A Written Test of Project Selectionability.
ERIC Educational Resources Information Center
Bacdayan, Paul
2002-01-01
Discusses organizations' use of quality improvement teams in total quality management and how they can benefit from training team personnel in how to select projects with a low risk of stalling. Describes an efficient written assessment test of project selection ability designed for those who conduct evaluations of training sessions. (Author/LRW)
Final Report of Project CHOICE: A Center for Helping Organizations Improve Choice in Education.
ERIC Educational Resources Information Center
Chapman, Davis W.; And Others
The purpose of the Center for Helping Organizations Improve Choice in Education (CHOICE) project, the scope of its activities, and evaluations of the effectiveness of those activities are described. One major project goal was to encourage and facilitate institutional efforts to provide more complete and accurate information to prospective…
Laycock, Alison; Bailie, Jodie; Matthews, Veronica; Cunningham, Frances; Harvey, Gillian; Percival, Nikki; Bailie, Ross
2017-01-01
Introduction Bringing together continuous quality improvement (CQI) data from multiple health services offers opportunities to identify common improvement priorities and to develop interventions at various system levels to achieve large-scale improvement in care. An important principle of CQI is practitioner participation in interpreting data and planning evidence-based change. This study will contribute knowledge about engaging diverse stakeholders in collaborative and theoretically informed processes to identify and address priority evidence-practice gaps in care delivery. This paper describes a developmental evaluation to support and refine a novel interactive dissemination project using aggregated CQI data from Aboriginal and Torres Strait Islander primary healthcare centres in Australia. The project aims to effect multilevel system improvement in Aboriginal and Torres Strait Islander primary healthcare. Methods and analysis Data will be gathered using document analysis, online surveys, interviews with participants and iterative analytical processes with the research team. These methods will enable real-time feedback to guide refinements to the design, reports, tools and processes as the interactive dissemination project is implemented. Qualitative data from interviews and surveys will be analysed and interpreted to provide in-depth understanding of factors that influence engagement and stakeholder perspectives about use of the aggregated data and generated improvement strategies. Sources of data will be triangulated to build up a comprehensive, contextualised perspective and integrated understanding of the project's development, implementation and findings. Ethics and dissemination The Human Research Ethics Committee (HREC) of the Northern Territory Department of Health and Menzies School of Health Research (Project 2015-2329), the Central Australian HREC (Project 15-288) and the Charles Darwin University HREC (Project H15030) approved the study. Dissemination will include articles in peer-reviewed journals, policy and research briefs. Results will be presented at conferences and quality improvement network meetings. Researchers, clinicians, policymakers and managers developing evidence-based system and policy interventions should benefit from this research. PMID:28710222
Grey Comprehensive Evaluation of Biomass Power Generation Project Based on Group Judgement
NASA Astrophysics Data System (ADS)
Xia, Huicong; Niu, Dongxiao
2017-06-01
The comprehensive evaluation of benefit is an important task needed to be carried out at all stages of biomass power generation projects. This paper proposed an improved grey comprehensive evaluation method based on triangle whiten function. To improve the objectivity of weight calculation result of only reference comparison judgment method, this paper introduced group judgment to the weighting process. In the process of grey comprehensive evaluation, this paper invited a number of experts to estimate the benefit level of projects, and optimized the basic estimations based on the minimum variance principle to improve the accuracy of evaluation result. Taking a biomass power generation project as an example, the grey comprehensive evaluation result showed that the benefit level of this project was good. This example demonstrates the feasibility of grey comprehensive evaluation method based on group judgment for benefit evaluation of biomass power generation project.
Maintaining Perioperative Normothermia: Sustaining an Evidence-Based Practice Improvement Project.
Levin, Rona F; Wright, Fay; Pecoraro, Kathleen; Kopec, Wendy
2016-02-01
Unintentional perioperative hypothermia has been shown to cause serious patient complications and, thus, to increase health care costs. In 2009, an evidence-based practice improvement project produced a significant decrease in unintentional perioperative hypothermia in colorectal surgical patients through monitoring of OR ambient room temperature. Project leaders engaged all interdisciplinary stakeholders in the original project, which facilitated the sustainability of the intervention method. An important aspect of sustainability is ongoing monitoring and evaluation of a new intervention method. Therefore, continued evaluation of outcomes of the protocol developed in 2009 was scheduled at specific time points after the initial small test of change with colorectal patients. This article focuses on how attention to sustainability factors during implementation of an improvement project led to the sustainability of a protocol for monitoring OR ambient room temperature with all types of surgical patients five years after the initial project. Copyright © 2016 AORN, Inc. Published by Elsevier Inc. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Keller, Carl J.
2004-07-13
BPA proposes to fund IDFG to plan and complete construction of fish passage improvements and water conservation activities that are contained within IDFG’s Statement of Work (SOW) for the period 7/1/04 to 6/30/05. The funding request contained in their SOW is part of an ongoing IDFG effort to fund anadromous fish passage projects that fall outside the scope of the Mitchell Act. The proposed SOW activities fall within the following four categories: Phase I-Planning and Design (gather data, perform investigations, and exchange information; perform surveys and assessments to be compliant; survey project sites and perform engineering designs; perform contract andmore » project management); Phase II-Construction and Implementation (procure materials and supplies, prepare contracts and solicit bids, plant native seedlings, complete capital improvements); Phase III-Operation and Maintenance (maintain office operations); and Phase IV- Monitoring and Evaluation (monitor and evaluate post-project effects, reporting). The SOW culminates with proposed construction of 18 capital improvement projects (Table 1 attached). The types of capital improvements include: screening gravity water diversions; consolidating and/or eliminating ditches; evaluating and screening pump diversions; evaluating and implementing water conservation activities; constructing screens along migration routes and rearing areas for hatchery and wild salmon; improving upstream and downstream passage for anadromous fish; and maximize benefits to aquatic habitat. Because each of the proposed projects in the SOW is still in the planning stages, the specifics of each still need to be completed.« less
Improving Reading Comprehension through Higher-Order Thinking Skills
ERIC Educational Resources Information Center
McKown, Brigitte A.; Barnett, Cynthia L.
2007-01-01
This action research project report documents the action research project that was conducted to improve reading comprehension with second grade and third grade students. The teacher researchers intended to improve reading comprehension by using higher-order thinking skills such as predicting, making connections, visualizing, inferring,…
Chapter 1: An Introduction to the Saber-Tooth Project.
ERIC Educational Resources Information Center
Ward, Phillip
1999-01-01
Introduces a theme issue on the Saber-Tooth Project, an ongoing reform effort involving a university and school district that collaborate to improve middle school physical education by improving teaching conditions and engaging teachers in professional development emphasizing curriculum improvement. The monograph explains the nature of…
Improving the completion of Quality Improvement projects amongst psychiatry core trainees.
Ewins, Liz
2015-01-01
Quality Improvement (QI) projects are seen increasingly as more valuable and effective in developing services than traditional audit. However, the development of this methodology has been slower in the mental health field and QI projects are new to most psychiatrists. This project describes a way of engaging trainees across Avon and Wiltshire Mental Health Partnership (AWP) Trust and the Severn School of Psychiatry in QI projects, using QI methodology itself. Through the implementation and development of training sessions and simple, low cost and sustainable interventions over a 10 month period, two thirds of core trainees and over a half of the advanced psychiatry trainees in the School are now participating in 28 individual QI projects and QI project methodology is to become embedded in the core psychiatry training course. As an additional positive outcome, specialty doctors, consultants, foundation doctors, GP trainees, medical students, as well as the wider multidisciplinary team, have all become engaged in QI projects alongside trainees, working with service users and their families to identify problems to tackle and ideas to test.
Riley, William; Parsons, Helen; McCoy, Kim; Burns, Debra; Anderson, Donna; Lee, Suhna; Sainfort, François
2009-10-01
To test the feasibility and assess the preliminary impact of a unique statewide quality improvement (QI) training program designed for public health departments. One hundred and ninety-five public health employees/managers from 38 local health departments throughout Minnesota were selected to participate in a newly developed QI training program and 65 of those engaged in and completed eight expert-supported QI projects over a period of 10 months from June 2007 through March 2008. As part of the Minnesota Quality Improvement Initiative, a structured distance education QI training program was designed and deployed in a first large-scale pilot. To evaluate the preliminary impact of the program, a mixed-method evaluation design was used based on four dimensions: learner reaction, knowledge, intention to apply, and preliminary outcomes. Subjective ratings of three dimensions of training quality were collected from participants after each of the scheduled learning sessions. Pre- and post-QI project surveys were administered to collect participant reactions, knowledge, future intention to apply learning, and perceived outcomes. Monthly and final QI project reports were collected to further inform success and preliminary outcomes of the projects. The participants reported (1) high levels of satisfaction with the training sessions, (2) increased perception of the relevance of the QI techniques, (3) increased perceived knowledge of all specific QI methods and techniques, (4) increased confidence in applying QI techniques on future projects, (5) increased intention to apply techniques on future QI projects, and (6) high perceived success of, and satisfaction with, the projects. Finally, preliminary outcomes data show moderate to large improvements in quality and/or efficiency for six out of eight projects. QI methods and techniques can be successfully implemented in local public health agencies on a statewide basis using the collaborative model through distance training and expert facilitation. This unique training can improve both core and support processes and lead to favorable staff reactions, increased knowledge, and improved health outcomes. The program can be further improved and deployed and holds great promise to facilitate the successful dissemination of proven QI methods throughout local public health departments.
Zhou, Yuqing; Xing, Yi; Liang, Xiaofeng; Yue, Chenyan; Zhu, Xu; Hipgrave, David
2016-01-01
Objective To evaluate interventions to improve routine vaccination coverage and caregiver knowledge in China's remote west, where routine immunisation is relatively weak. Design Prospective pre–post (2006–2010) evaluation in project counties; retrospective comparison based on 2004 administrative data at baseline and surveyed post-intervention (2010) data in selected non-project counties. Setting Four project counties and one non-project county in each of four provinces. Participants 3390 children in project counties at baseline, and 3299 in project and 830 in non-project counties post-intervention; and 3279 caregivers at baseline, and 3389 in project and 830 in non-project counties post-intervention. Intervention Multicomponent inexpensive knowledge-strengthening and service-strengthening and innovative, multisectoral engagement. Data collection Standard 30-cluster household surveys of vaccine coverage and caregiver interviews pre-intervention and post-intervention in each project county. Similar surveys in one non-project county selected by local authorities in each province post-intervention. Administrative data on vaccination coverage in non-project counties at baseline. Primary outcome measures Changes in vaccine coverage between baseline and project completion (2010); comparative caregiver knowledge in all counties in 2010. Analysis Crude (χ2) analysis of changes and differences in vaccination coverage and related knowledge. Multiple logistic regression to assess associations with timely coverage. Results Timely coverage of four routine vaccines increased by 21% (p<0.001) and hepatitis B (HepB) birth dose by 35% (p<0.001) over baseline in project counties. Comparison with non-project counties revealed secular improvement in most provinces, except new vaccine coverage was mostly higher in project counties. Ethnicity, province, birthplace, vaccination site, dual-parental out-migration and parental knowledge had significant associations with coverage. Knowledge increased for all variables but one in project counties (highest p<0.05) and was substantially higher than in non-project counties (p<0.01). Conclusions Comprehensive but inexpensive strategies improved vaccination coverage and caretaker knowledge in western China. Establishing multisectoral leadership, involving the education sector and including immunisation in public-sector performance standards, are affordable and effective interventions. PMID:26966053
[Surveillance on drinking-water-born endemic fluorosis in China, 2013].
Zhao, L J; Pei, J R; Zhang, W; Wang, W; Yu, G Q; Sun, D J; Gao, Y H
2016-06-01
To investigate the prevalence of fluorosis and related control measures on drinking water type of endemic fluorosis in China. According to the national program- "Surveillance Scheme of Drinking-Water-Borne Endemic Fluorosis" , 136 counties were selected in 29 provinces, autonomous regions and municipalities. Three epidemic villages were randomly selected as fixed monitoring sites in each county. Dental fluorosis of all the children aged 8-12 living in the villages under the monitoring program, was identified under the ariteria from "Diagnosis of dental fluorosis" (WS/T 208-2011). Operating conditions and contents of fluoride in all the'water-improved projects' were investigated. Contents of fluoride in drinking water were tested in villages without the 'water-improved projects'. "Standard Test Method for Drinking Water" (GB/T 5750.5-2006) was used to detect the water fluoride. The overall prevalence of dental fluorosis among children aged 8-12 in all the villages under monitor program, was 28.58% (7 950/27 817), with the dental fluorosis index (DFI) as 0.58. Among them, the prevalence was 22.28% (3 917/17 583) and DFI was 0.44 in the'water-improved projects' villages that under normal operation and with qualified fluoride contents. The prevalence appeared as 38.74% (1 926/4 971) with DFI as 0.84 in those villages with 'water-improved projects' but mal-operated or with excessive fluoride. The prevalence was 40.03% (2 107/5 263), and DFI was 0.81 in those villages without 'water-improved projects'. The prevalence rates of dental fluorosis in children from the three types of endemic areas were significantly different. For 'water-improved projects', the normal opration rate was 93.77% (286/305) and the qualification rate of fluoride content was 76.77% (228/297). Dental fluorosis in children living in the drinking-water-born endemic fluorosis areas was on the edge of epidemics in China. Effective improvement on the quality of drinking water can significantly reduce the severity of dental fluorosis in children. The rate of proper operation on 'water-improved projects' was near to 95% in the endemic area. However, rate that met the criteria on qualified fluoride contents of these projects was still below 80%.
Using the integrated nurse leadership program to reduce sepsis mortality.
Kliger, Julie; Singer, Sara J; Hoffman, Frank H
2015-06-01
The Integrated Nurse Leadership Program (INLP) is a collaborative improvement model focused on developing practical leadership skills of nurses and other frontline clinicians to lead quality improvement efforts. Sepsis is a major challenge to treat because it arises unpredictably and can progress rapidly. Nine San Francisco Bay Area hospitals participated in a 22-month INLP Sepsis Mortality Reduction Project to improve sepsis detection and management. The INLP focused on developing leadership and process improvement skills of nurses and other frontline clinicians. Teams of trained clinicians then implemented three strategies to improve early identification and timely treatment of sepsis: (1) sepsis screening of all patients, with diagnostic testing according to protocol; (2) timely treatment on the basis of key elements of Early Goal-Directed Therapy (EGDT); and (3) ongoing data review. Each hospital agreed to pursue the goal of reducing sepsis mortality by 15% by the end of the project. In the data collection period (baseline, July-December 2008 and project completion, January-June 2011), team members showed strong improvement in perceived leadership skills, team effectiveness, and ability to improve care quality. During this period, sepsis mortality for eight of the participating hospitals (Hospital 9 joined the project six months after it began) decreased by 43.7%-from 28% in the baseline period to 16% at project completion. Sepsis mortality rates trended downward for all hospitals, significantly decreasing (p<.05 at one hospital, p<.01 for four hospitals). In addition to improvement in safety culture and management of septic patients, hospitals participating in the INLP Sepsis Mortality Reduction Project achieved reductions in sepsis mortality during the study period and sustained reductions for more than one year later. The INLP model can be readily applied beyond sepsis management and mortality to other quality problems.
Xu, Gang; Baines, Richard; Westacott, Rachel; Selby, Nick; Carr, Susan
2014-03-20
To assess the impact of a quality improvement project that used a multifaceted educational intervention on how to improve clinician's knowledge, confidence and awareness of acute kidney injury (AKI). 2 large acute teaching hospitals in England, serving a combined population of over 1.5 million people. All secondary care clinicians working in the clinical areas were targeted, with a specific focus on clinicians working in acute admission areas. A multifaceted educational intervention consisting of traditional didactic lectures, case-based teaching in small groups and an interactive web-based learning resource. We assessed clinicians' knowledge of AKI and their self-reported clinical behaviour using an interactive questionnaire before and after the educational intervention. Secondary outcome measures included clinical audit of patient notes before and after the intervention. 26% of clinicians reported that they were aware of local AKI guidelines in the preintervention questionnaire compared to 64% in the follow-up questionnaire (χ²=60.2, p<0.001). There was an improvement in the number of clinicians reporting satisfactory practice when diagnosing AKI, 50% vs 68% (χ²=12.1, p<0.001) and investigating patients with AKI, 48% vs 64% (χ²=9.5, p=0.002). Clinical audit makers showed a trend towards better clinical practice. This quality improvement project utilising a multifaceted educational intervention improved awareness of AKI as demonstrated by changes in the clinician's self-reported management of patients with AKI. Elements of the project have been sustained beyond the project period, and demonstrate the power of quality improvement projects to help initiate changes in practice. Our findings are limited by confounding factors and highlight the need to carry out formal randomised studies to determine the impact of educational initiatives in the clinical setting.
Guiding inpatient quality improvement: a systematic review of Lean and Six Sigma.
Glasgow, Justin M; Scott-Caziewell, Jill R; Kaboli, Peter J
2010-12-01
Two popular quality improvement (QI) approaches in health care are Lean and Six Sigma. Hospitals continue to adopt these QI approaches-or the hybrid Lean Sigma approach-with little knowledge on how well they produce sustainable improvements. A systematic literature review was conducted to determine whether Lean, Six Sigma, or Lean Sigma have been effectively used to create and sustain improvements in the acute care setting. Databases were searched for articles published in the health care, business, and engineering literatures. Study inclusion criteria required identification of a Six Sigma, Lean, or Lean Sigma project; QI efforts focused on hospitalized patients; descriptions of project improvements; and reported results. Depending on the quality of data reported, articles were classified as summary reports, pre-post observational studies, or time-series reports. Database searches identified 539 potential articles. After review of titles, abstracts, and full text, 47 articles met inclusion criteria--10 articles summarized multiple projects, 12 reported Lean projects, 20 reported Six Sigma projects, and 5 reported Lean Sigma projects. Generally, the studies provided limited data, with only 15 articles providing any sort of follow-up data; of the 15, only 3 report a follow-up period greater than two years. Lean, Six Sigma, and Lean Sigma as QI approaches can aid institutions in tackling a wide variety of problems encountered in acute care. However, the true impact of these approaches is difficult to judge, given that the lack of rigorous evaluation or clearly sustained improvements provides little evidence supporting broad adoption. There is still a need for future work that will improve the evidence base for understanding more about QI approaches and how to achieve sustainable improvement.
Project Management Meets Change Management - A Success Story. Focus Area: Tech Perspectives TI012SN
NASA Technical Reports Server (NTRS)
Hall, Wayne
2011-01-01
Utilizing the concepts and terminology from Project Management, the process of planning and executing a Change Management (CM) Infrastructure improvement project is described. The primary audience for this presentation includes both experienced and relatively new CM administrators and their managers. It also includes anyone with an interest in the application of project management knowledge to CM administration. There are several benefits: the complexity of the CM tool technology is more manageable, CM administrators get to use project management knowledge to complete a project (not "firefighting"), improve relations with your customers (that means developers and managers), and get the opportunity to do it again.
McDonald, Steve; Turner, Tari; Chamberlain, Catherine; Lumbiganon, Pisake; Thinkhamrop, Jadsada; Festin, Mario R; Ho, Jacqueline J; Mohammad, Hakimi; Henderson-Smart, David J; Short, Jacki; Crowther, Caroline A; Martis, Ruth; Green, Sally
2010-07-01
Rates of maternal and perinatal mortality remain high in developing countries despite the existence of effective interventions. Efforts to strengthen evidence-based approaches to improve health in these settings are partly hindered by restricted access to the best available evidence, limited training in evidence-based practice and concerns about the relevance of existing evidence. South East Asia--Optimising Reproductive and Child Health in Developing Countries (SEA-ORCHID) was a five-year project that aimed to determine whether a multifaceted intervention designed to strengthen the capacity for research synthesis, evidence-based care and knowledge implementation improved clinical practice and led to better health outcomes for mothers and babies. This paper describes the development and design of the SEA-ORCHID intervention plan using a logical framework approach. SEA-ORCHID used a before-and-after design to evaluate the impact of a multifaceted tailored intervention at nine sites across Thailand, Malaysia, Philippines and Indonesia, supported by three centres in Australia. We used a logical framework approach to systematically prepare and summarise the project plan in a clear and logical way. The development and design of the SEA-ORCHID project was based around the three components of a logical framework (problem analysis, project plan and evaluation strategy). The SEA-ORCHID logical framework defined the project's goal and purpose (To improve the health of mothers and babies in South East Asia and To improve clinical practice in reproductive health in South East Asia), and outlined a series of project objectives and activities designed to achieve these. The logical framework also established outcome and process measures appropriate to each level of the project plan, and guided project work in each of the participating countries and hospitals. Development of a logical framework in the SEA-ORCHID project enabled a reasoned, logical approach to the project design that ensured the project activities would achieve the desired outcomes and that the evaluation plan would assess both the process and outcome of the project. The logical framework was also valuable over the course of the project to facilitate communication, assess progress and build a shared understanding of the project activities, purpose and goal.
2010-01-01
Background Rates of maternal and perinatal mortality remain high in developing countries despite the existence of effective interventions. Efforts to strengthen evidence-based approaches to improve health in these settings are partly hindered by restricted access to the best available evidence, limited training in evidence-based practice and concerns about the relevance of existing evidence. South East Asia - Optimising Reproductive and Child Health in Developing Countries (SEA-ORCHID) was a five-year project that aimed to determine whether a multifaceted intervention designed to strengthen the capacity for research synthesis, evidence-based care and knowledge implementation improved clinical practice and led to better health outcomes for mothers and babies. This paper describes the development and design of the SEA-ORCHID intervention plan using a logical framework approach. Methods SEA-ORCHID used a before-and-after design to evaluate the impact of a multifaceted tailored intervention at nine sites across Thailand, Malaysia, Philippines and Indonesia, supported by three centres in Australia. We used a logical framework approach to systematically prepare and summarise the project plan in a clear and logical way. The development and design of the SEA-ORCHID project was based around the three components of a logical framework (problem analysis, project plan and evaluation strategy). Results The SEA-ORCHID logical framework defined the project's goal and purpose (To improve the health of mothers and babies in South East Asia and To improve clinical practice in reproductive health in South East Asia), and outlined a series of project objectives and activities designed to achieve these. The logical framework also established outcome and process measures appropriate to each level of the project plan, and guided project work in each of the participating countries and hospitals. Conclusions Development of a logical framework in the SEA-ORCHID project enabled a reasoned, logical approach to the project design that ensured the project activities would achieve the desired outcomes and that the evaluation plan would assess both the process and outcome of the project. The logical framework was also valuable over the course of the project to facilitate communication, assess progress and build a shared understanding of the project activities, purpose and goal. PMID:20594325
76 FR 40370 - Agency Information Collection Activities: Proposed Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-08
... Program and Quality Improvement Project Reporting Tools; Use: Section 1852e(1), (2), (3)(a)(i) of the...), and reporting its performance to CMS. MAOs will submit their Chronic Care Improvement Programs (CCIPs) and Quality Improvement Project (QIPs) using the revised CCIP and QIP Reporting Tools that are...
Agricultural model intercomparison and improvement project: Overview of model intercomparisons
USDA-ARS?s Scientific Manuscript database
Improvement of crop simulation models to better estimate growth and yield is one of the objectives of the Agricultural Model Intercomparison and Improvement Project (AgMIP). The overall goal of AgMIP is to provide an assessment of crop model through rigorous intercomparisons and evaluate future clim...
Improving Student Naval Aviator Aircraft Carrier Landing Performance
ERIC Educational Resources Information Center
Sheppard, Thomas H.; Foster, T. Chris
2008-01-01
This article discusses the use of human performance technology (HPT) to improve qualification rates for learning to land onboard aircraft carriers. This project started as a request for a business case analysis and evolved into a full-fledged performance improvement project, from mission analysis through evaluation. The result was a significant…
Improving Student Teamwork in a Collaborative Project-Based Course
ERIC Educational Resources Information Center
Kapp, Edward
2009-01-01
While collaborative student projects can be effective in improving student learning, the failure of students to work together effectively remains a widely reported problem in collaborative learning. This article describes a team-building intervention designed to improve the students' abilities to work together in teams successfully. The…
78 FR 47480 - Notice of Funding Availability for the Tribal Transportation Program Safety Funds
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-05
... engineering improvement projects include, but are not limited to: Intersection safety improvements; Pavement..., replacement, and other improvement of highway signage and pavement markings, or a project to maintain minimum... Administration entitled `Highway Design Handbook for Older Drivers and Pedestrians'; Truck parking facilities...
Environmental Data Flow Six Sigma Process Improvement Savings Overview
DOE Office of Scientific and Technical Information (OSTI.GOV)
Paige, Karen S
An overview of the Environmental Data Flow Six Sigma improvement project covers LANL’s environmental data processing following receipt from the analytical laboratories. The Six Sigma project identified thirty-three process improvements, many of which focused on cutting costs or reducing the time it took to deliver data to clients.
Improved pupil dilation with medication-soaked pledget sponges.
Weddle, Celeste; Thomas, Nikki; Dienemann, Jacqueline
2013-08-01
Use of multiple preoperative drops for pupil dilation has been shown to be inexact, to delay surgery, and to cause dissatisfaction among perioperative personnel. This article reports on an evidence-based, quality improvement project to locate and appraise research on improved effectiveness and efficiency of mydriasis (ie, pupillary dilation), and the subsequent implementation of a pledget-sponge procedure for pupil dilation at one ambulatory surgery center. Project leaders used an evidence-based practice model to assess the problem, research options for improvement, define goals, and implement a pilot project to test the new dilation technique. Outcomes from the pilot project showed a reduced number of delays caused by poor pupil dilation and a decrease in procedure turnover time. The project team solicited informal feedback from preoperative nurses, which reflected increased satisfaction in preparing patients for cataract procedures. After facility administrators and surgeons accepted the procedure change, it was adopted for preoperative use for all patients undergoing cataract surgery at the ambulatory surgery center. Copyright © 2013 AORN, Inc. Published by Elsevier Inc. All rights reserved.
New Orleans Effective Schools Project. An Interim Report to the Orleans Parish School Board.
ERIC Educational Resources Information Center
David, Jane L.
The primary goal of the Southern Coalition for Educational Equity's New Orleans Effective Schools Project is to improve academic achievement at one middle school, Martin Behrman, in ways that can be replicated by schools facing similar problems. The Project is based on research findings about school improvement from the school effectiveness…
Special Project Grants Awarded for Improvement in Nurse Training. A Listing.
ERIC Educational Resources Information Center
National Institutes of Health (DHEW), Bethesda, MD. Div. of Nursing.
This current directory lists alphabetically by state, special projects funded by the Title II Nurse Training Act of the Health Manpower Act of 1968, which are awarded for improvement programs in nurse training. Projects funded through June 1971 are listed and briefly annotated, including planning grants awarded for the first time during the fiscal…
ERIC Educational Resources Information Center
Ecklund, Britt K.; Lamon, Kathryn M.
2008-01-01
The action research project report began when the teacher researchers determined that students at Sites A and B struggled with reading achievement. The purpose of the project was to improve students' reading achievement through increased motivation, specific skill instruction, and additional practice time. The project involved 26 students: 17…
Learning Investment for Tomorrow: ESEA Title I Project 69-092, Evaluation Report, 1968-1969.
ERIC Educational Resources Information Center
Colorado Springs Public Schools, CO. Div. of Special Services.
This evaluation report carries a description of each project then in operation, an analysis of the evaluative data collected for each, and recommendations for improvement. Objectives of the projects, geared for disadvantaged youth (K-12), were: improvement of performance of capabilities of children with learning disabilities due to psychological,…
Psychology in an Interdisciplinary Setting: A Large-Scale Project to Improve University Teaching
ERIC Educational Resources Information Center
Koch, Franziska D.; Vogt, Joachim
2015-01-01
At a German university of technology, a large-scale project was funded as a part of the "Quality Pact for Teaching", a programme launched by the German Federal Ministry of Education and Research to improve the quality of university teaching and study conditions. The project aims at intensifying interdisciplinary networking in teaching,…
ERIC Educational Resources Information Center
Rodriguez, Felix; Colon, Elsie M.
The Industry-Academia Partnership Pilot Project (IAPPP) was undertaken by Huertas Junior College (HJC), in Caguas, Puerto Rico, to improve advanced technical education, enhance the competitive capabilities of the region, and reduce the region's unemployment rate. The project consisted of three basic components: professional growth opportunities…
Improved Weather and Power Forecasts for Energy Operations - the German Research Project EWeLiNE
NASA Astrophysics Data System (ADS)
Lundgren, Kristina; Siefert, Malte; Hagedorn, Renate; Majewski, Detlev
2014-05-01
The German energy system is going through a fundamental change. Based on the energy plans of the German federal government, the share of electrical power production from renewables should increase to 35% by 2020. This means that, in the near future at certain times renewable energies will provide a major part of Germany's power production. Operating a power supply system with a large share of weather-dependent power sources in a secure way requires improved power forecasts. One of the most promising strategies to improve the existing wind power and PV power forecasts is to optimize the underlying weather forecasts and to enhance the collaboration between the meteorology and energy sectors. Deutscher Wetterdienst addresses these challenges in collaboration with Fraunhofer IWES within the research project EWeLiNE. The overarching goal of the project is to improve the wind and PV power forecasts by combining improved power forecast models and optimized weather forecasts. During the project, the numerical weather prediction models COSMO-DE and COSMO-DE-EPS (Ensemble Prediction System) by Deutscher Wetterdienst will be generally optimized towards improved wind power and PV forecasts. For instance, it will be investigated whether the assimilation of new types of data, e.g. power production data, can lead to improved weather forecasts. With regard to the probabilistic forecasts, the focus is on the generation of ensembles and ensemble calibration. One important aspect of the project is to integrate the probabilistic information into decision making processes by developing user-specified products. In this paper we give an overview of the project and present first results.
Bruce, Ian James
2011-02-01
This article outlines the nature and activities of the recently completed EU Framework Programme 6 Integrated Project, Novel and Improved Nanomaterials, Chemistries and Apparatus for Nanobiotechnology (NACBO). This project was designed to yield new nanomaterials, surface activation and synthetic nucleic acid chemistries, procedures and hardware for applications in forensics and diagnostics. It provides details on the project's structure and partnership along with its principal objectives and successes in terms of publications and commercial exploitation.
Lu, Hui; Yan, Fei; Wang, Wei; Wu, Laiwa; Ma, Weiping; Chen, Jing; Shen, Xin; Mei, Jian
2013-01-01
Tuberculosis (TB) in internal migrants is one of three threats for TB control in China. To address this threat, a project was launched in eight of the 19 districts of Shanghai in 2007 to provide transportation subsidies and living allowances for all migrant TB cases. This study aims to determine if this project contributed to improved TB control outcomes among migrants in urban Shanghai. This was a community intervention study. The data were derived from the TB Management Information System in three project districts and three non-project districts in Shanghai between 2006 and 2010. The impact of the project was estimated in a difference-in-difference (DID) analysis framework, and a multivariable binary logistic regression analysis. A total of 1872 pulmonary TB (PTB) cases in internal migrants were included in the study. The treatment success rate (TSR) for migrant smear-positive cases in project districts increased from 59.9% in 2006 to 87.6% in 2010 (P < 0.001). The crude DID improvement of TSR was 18.9%. There was an increased probability of TSR in the project group before and after the project intervention period (coefficient = 1.156, odds ratio = 3.178, 95% confidence interval: 1.305-7.736, P = 0.011). The study showed the project could improve treatment success in migrant PTB cases. This was a short-term programme using special financial subsidies for all migrant PTB cases. It is recommended that project funds be continuously invested by governments with particular focus on the more vulnerable PTB cases among migrants.
Sutton, Elizabeth; Dixon-Woods, Mary; Tarrant, Carolyn
2016-01-01
Objectives Quality improvement projects to address transitions of care across care boundaries are increasingly common but meet with mixed success for reasons that are poorly understood. We aimed to characterise challenges in a project to improve transitions for older people between hospital and care homes. Design Independent process evaluation, using ethnographic observations and interviews, of a quality improvement project. Setting and participants An English hospital and two residential care homes for older people. Data 32 hours of non-participant observations and 12 semistructured interviews with project members, hospital and care home staff. Results A hospital-based improvement team sought to reduce unplanned readmissions from residential care homes using interventions including a community-based geriatric team that could be accessed directly by care homes and a communication tool intended to facilitate transfer of information between homes and hospital. Only very modest (if any) impacts of these interventions on readmission rates could be detected. The process evaluation identified multiple challenges in implementing interventions and securing improvement. Many of these arose because of lack of consensus on the nature of the problem and the proper solutions: while the hospital team was keen to reduce readmissions and saw the problems as lying in poor communication and lack of community-based support for care homes, the care home staff had different priorities. Care home staff were unconvinced that the improvement interventions were aligned with their needs or addressed their concerns, resulting in compromised implementation. Conclusions Process evaluations have a valuable role in quality improvement. Our study suggests that a key task for quality improvement projects aimed at transitions of care is that of developing a shared view of the problem to be addressed. A more participatory approach could help to surface assumptions, interpretations and interests and could facilitate the coproduction of solutions. This finding is likely to have broader applicability. PMID:27491666
Pulver, Lisa K; Tett, Susan E; Coombes, Judith
2009-01-01
Background Multicentre drug use evaluations are described in the literature infrequently and usually publish only the results. The purpose of this paper is to describe the experience of Queensland hospitals participating in the Community-Acquired Pneumonia Towards Improving Outcomes Nationally (CAPTION) project, specifically evaluating the implementation of this project, detailing benefits and drawbacks of involvement in a national drug use evaluation program. Methods Emergency departments from nine hospitals in Queensland, Australia, participated in CAPTION, a national quality improvement project, conducted in 37 Australian hospitals. CAPTION was aimed at optimising prescribing in the management of Community-Acquired Pneumonia according to the recommendations of the Australian Therapeutic Guidelines: Antibiotic 12th edition. The project involved data collection, and evaluation, feedback of results and a suite of targeted educational interventions including audit and feedback, group presentations and academic detailing. A baseline audit and two drug use evaluation cycles were conducted during the 2-year project. The implementation of the project was evaluated using feedback forms after each phase of the project (audit or intervention). At completion a group meeting with the hospital coordinators identified positive and negative elements of the project. Results Evaluation by hospitals of their participation in CAPTION demonstrated both benefits and drawbacks. The benefits were grouped into the impact on the hospital dynamic such as; improved interdisciplinary working relationships (e.g. between pharmacist and doctor), recognition of the educational/academic role of the pharmacist, creation of ED Pharmacist positions and enhanced involvement with the National Prescribing Service, and personal benefits. Personal benefits included academic detailing training for participants, improved communication skills and opportunities to present at conferences. The principal drawback of participation was the extra burden on already busy staff members. Conclusion A national multicentre drug use evaluation project such as CAPTION allows hospitals which would otherwise not undertake such projects the opportunity to participate. The Queensland arm of CAPTION demonstrated benefits to both the individual participants and their hospitals, highlighting the additional value of participating in a multicentre project of this type. PMID:19646287
ERIC Educational Resources Information Center
Chan, Tak Cheung
To determine whether initial facility improvement costs were paid back by the reduced operational costs resulting from the improvement projects, this study examined the relationship between initial costs and operational costs of fourteen school buildings improved during the 1978-79 school year in Greenville County, South Carolina. With energy…
How to Sustain Change and Support Continuous Quality Improvement
McQuillan, Rory; Harel, Ziv; Weizman, Adam V.; Thomas, Alison; Nesrallah, Gihad; Bell, Chaim M.; Chan, Christopher T.; Chertow, Glenn M.
2016-01-01
To achieve sustainable change, quality improvement initiatives must become the new way of working rather than something added on to routine clinical care. However, most organizational change is not maintained. In this next article in this Moving Points in Nephrology feature on quality improvement, we provide health care professionals with strategies to sustain and support quality improvement. Threats to sustainability may be identified both at the beginning of a project and when it is ready for implementation. The National Health Service Sustainability Model is reviewed as one example to help identify issues that affect long-term success of quality improvement projects. Tools to help sustain improvement include process control boards, performance boards, standard work, and improvement huddles. Process control and performance boards are methods to communicate improvement results to staff and leadership. Standard work is a written or visual outline of current best practices for a task and provides a framework to ensure that changes that have improved patient care are consistently and reliably applied to every patient encounter. Improvement huddles are short, regular meetings among staff to anticipate problems, review performance, and support a culture of improvement. Many of these tools rely on principles of visual management, which are systems transparent and simple so that every staff member can rapidly distinguish normal from abnormal working conditions. Even when quality improvement methods are properly applied, the success of a project still depends on contextual factors. Context refers to aspects of the local setting in which the project operates. Context affects resources, leadership support, data infrastructure, team motivation, and team performance. For these reasons, the same project may thrive in a supportive context and fail in a different context. To demonstrate the practical applications of these quality improvement principles, these principles are applied to a hypothetical quality improvement initiative that aims to promote home dialysis (home hemodialysis and peritoneal dialysis). PMID:27016498
NASA Technical Reports Server (NTRS)
Hilbert, Kent; Anderson, Daniel; Lewis, David
2007-01-01
The 2005 hurricane season - especially Hurricane Katrina - left the Mississippi Gulf Coast devastated. In its efforts to assist in coastal re-building efforts, the U.S. Congress passed the Defense Appropriation Act of 2006. This legislation directed the Secretary of the Army, via the USACE, to generate reports discussing possible projects that would improve the State of Mississippi?s coastal region. These projects are referred to as the MsCIP. Data collected via the LDCM OLI could be used to evaluate the success of projects that result from the MsCIP by monitoring regional coastal changes associated with such projects. This Candidate Solution is in alignment with the Coastal Management, Water Management, and Disaster Management National Applications and will benefit society by improving the post-Hurricane Katrina Mississippi Gulf Coast.
Jeffs, Lianne P; Lo, Joyce; Beswick, Susan; Campbell, Heather
2013-01-01
With the movement to advance quality care and improve health care outcomes, organizations have increasingly implemented quality improvement (QI) initiatives to meet these requirements. Key to implementation success is the multilevel involvement of frontline clinicians and leadership. To explore the perceptions and experiences of frontline nurses, project leads, and managers associated with an organization-wide initiative aimed at engaging nurses in quality improvement work. To address the aims of this study, a qualitative research approach was used. Two focus groups were conducted with a total of 13 nurse participants, and individual interviews were done with 10 managers and 6 project leads. Emergent themes from the interview data included the following: improving care in a networked approach; driving QI and having a sense of pride; and overcoming challenges. Specifically, our findings elucidate the value of communities of practice and ongoing mentorship for nurses as key strategies to acquire and apply QI knowledge to a QI project on their respective units. Key challenges emerged including workload and time constraints, as well as resistance to change from staff. Our study findings suggest that leaders need to provide learning opportunities and protected time for frontline nurses to participate in QI projects.
ERIC Educational Resources Information Center
Reading Teacher, 2008
2008-01-01
How many times have researchers and professional developers approached you or your school with "the answer" to improving literacy achievement? How did it work out? If changes occurred during the engagement with these outside partners, what remained after the project ended? Did such efforts lead to lasting change and improvement in…
ERIC Educational Resources Information Center
Merrill, Ray M.; Aldana, Stephen G.; Greenlaw, Roger L.; Diehl, Hans A.
2008-01-01
Background: The Coronary Health Improvement Project (CHIP) is designed to lower cardiovascular risk factors among a group of generally healthy individuals through health education. Purpose: This study will evaluate the efficacy of the CHIP intervention at improving eating, sleep, stress, and depressive disorders. Methods: A health education…
Investing in the Improvement of Education: Lessons to be Learned from the National Writing Project
ERIC Educational Resources Information Center
St. John, Mark; Stokes, Laura
2008-01-01
This paper defines the concept of "improvement infrastructure" and "educational capital" for education, and it uses the case of the National Writing Project to develop an extended, data-based illustration of the design and generativeness of an improvement infrastructure. Since 1983 there have been multiple "waves" of…
Improving Classroom Acoustics (ICA): A Three-Year FM Sound Field Classroom Amplification Study.
ERIC Educational Resources Information Center
Rosenberg, Gail Gegg; Blake-Rahter, Patricia; Heavner, Judy; Allen, Linda; Redmond, Beatrice Myers; Phillips, Janet; Stigers, Kathy
1999-01-01
The Improving Classroom Acoustics (ICA) special project was designed to determine if students' listening and learning behaviors improved as a result of an acoustical environment enhanced through the use of FM sound field classroom amplification. The 3-year project involved 2,054 students in 94 general education kindergarten, first-, and…
ERIC Educational Resources Information Center
Data Quality Campaign, 2012
2012-01-01
Since 2007 the Oregon DATA Project has been investing resources to provide educators on-the-job training around effective data use to improve student achievement. New evidence shows that their efforts are paying off. A 2011 Oregon DATA Project report detailed the impact of their investment in the state's educators, finding the following: (1)…
Modeling the potential of the Northern China forest shelterbelt in improving hydroclimate conditions
Yongqiang Liu; John Stanturf; Houquan Lu
2008-01-01
The forest shelterbelt (afforestation) project in northern China is the most significant ecosystem project initiated in China during the past three decades. It aims to improve and conserve the ecological environment in the project areas. The tree belt stands along the southern edge of the sandy lands, nearly paralleling to the Great Wall. This study used a regional...
ERIC Educational Resources Information Center
Kane, Thomas J.; Baxter, Andrew D.; Schooley, Korynn
2012-01-01
Launched in 2008, the Strategic Data Project, housed at the Center for Education Policy Research at Harvard University, seeks to bridge the divide between educational research and practice in order to transform the use of data in education to improve student achievement. Through the project, the authors build robust research partnerships with…
Evaluating projects for improving fish and wildlife habitat on National Forests.
Fred H. Everest; Daniel R. Talhelm
1982-01-01
Recent legislation (PL. 93-452; P.L. 94-588) has emphasized improvement of fish and wildlife habitat on lands of the National Forest System. A sequential procedure has been developed for screening potential projects to identify those producing the greatest fishery benefits. The procedureâwhich includes program planning, project planning, and intensive benefit/cost...
ERIC Educational Resources Information Center
Hung, Chun-Ming; Hwang, Gwo-Jen; Huang, Iwen
2012-01-01
Although project-based learning is a well-known and widely used instructional strategy, it remains a challenging issue to effectively apply this approach to practical settings for improving the learning performance of students. In this study, a project-based digital storytelling approach is proposed to cope with this problem. With a…
ERIC Educational Resources Information Center
Crist, Courtney A.; Duncan, Susan E.; Bianchi, Laurie M.
2017-01-01
A Wiki research project was created in the Functional Foods for Health (FST/HNFE 2544) as an instructional tool and assignment for improving undergraduate students' proficiency in evaluating appropriate information sources for rapidly evolving science and research. The project design targeted improving students' information literacy skills…
ERIC Educational Resources Information Center
Felner, Robert D.; Favazza, Antoinette; Shim, Minsuk; Brand, Stephen; Gu, Kenneth; Noonan, Nancy
2001-01-01
Describes the School Transitional Environment Project and its successor, the Project on High Performance Learning Communities, that have contributed to building a model for school improvement called the High Performance Learning Communities. The model seeks to build the principles of prevention into whole school change. Presents findings from…
ERIC Educational Resources Information Center
Armbruster, Bonnie B.; And Others
The Collaboration to Improve Reading in the Content Areas (CIRCA) project, a collaborative effort between the Center for the Study of Reading and the Chicago Public Schools, is described in this paper. Noting that the project was designed to translate research about content area reading into practice, the first section briefly discusses the…
Watkins, Eren Youmans; Kemeter, Dave M; Spiess, Anita; Corrigan, Elizabeth; Kateley, Keri; Wills, John V; Mancha, Brent Edward; Nichols, Jerrica; Bell, Amy Millikan
2014-01-01
Lean Six Sigma (LSS) is a process improvement, problem-solving methodology used in business and manufacturing to improve the speed, quality, and cost of products. LSS can also be used to improve knowledge-based products integral to public health surveillance. An LSS project by the Behavioral Social Health Outcomes Program of the Army Institute of Public Health reduced the number of labor hours spent producing the routine surveillance of suicidal behavior publication. At baseline, the total number of labor hours was 448; after project completion, total labor hours were 199. Based on customer feedback, publication production was reduced from quarterly to annually. Process improvements enhanced group morale and established best practices in the form of standard operating procedures and business rules to ensure solutions are sustained. LSS project participation also fostered a change in the conceptualization of tasks and projects. These results demonstrate that LSS can be used to inform the public health process and should be considered a viable method of improving knowledge-based products and processes.
Project Loon based augmentation for global ionospheric modeling over Southern Hemisphere
NASA Astrophysics Data System (ADS)
Wang, Cheng; Shi, Chuang; Zhang, Hongping
2017-04-01
Global ionospheric products of vertical total electron content (VTEC) derived from GNSS measurements may have low accuracy over oceans and southern latitudes where there are not rich observations. Project Loon provides a great opportunity to enhance the measurements over those areas. In this contribution, a simulation of Project Loon based augmentation for global ionospheric modeling is performed by using the international reference ionosphere (IRI) which could simulate VTEC measurements for the balloons. The performance of the enhanced method based on simulation of Project Loon is investigated by comparing with VTEC maps from Ionosphere Associate Analysis Centers (IAACs) as well as IGS final GIMs. The comparison indicates that there is a better consistency between the VTEC maps by the enhanced method and IGS final GIMs. Also, obvious improvements of RMS maps in GIMs for the middle latitudes and southern latitudes are enabled by the augmentation of Project Loon. Additionally, JASON data are used to validate the specific improvement of the VTEC maps. The results show that the performance of VTEC maps is improved slightly, especially in southern latitudes. It is possible that the VTEC maps could be improved significantly by using real GPS measurements from balloons of Project Loon in the near future.
Project Loon based augmentation for global ionospheric modeling over Southern Hemisphere.
Wang, Cheng; Shi, Chuang; Zhang, Hongping
2017-04-06
Global ionospheric products of vertical total electron content (VTEC) derived from GNSS measurements may have low accuracy over oceans and southern latitudes where there are not rich observations. Project Loon provides a great opportunity to enhance the measurements over those areas. In this contribution, a simulation of Project Loon based augmentation for global ionospheric modeling is performed by using the international reference ionosphere (IRI) which could simulate VTEC measurements for the balloons. The performance of the enhanced method based on simulation of Project Loon is investigated by comparing with VTEC maps from Ionosphere Associate Analysis Centers (IAACs) as well as IGS final GIMs. The comparison indicates that there is a better consistency between the VTEC maps by the enhanced method and IGS final GIMs. Also, obvious improvements of RMS maps in GIMs for the middle latitudes and southern latitudes are enabled by the augmentation of Project Loon. Additionally, JASON data are used to validate the specific improvement of the VTEC maps. The results show that the performance of VTEC maps is improved slightly, especially in southern latitudes. It is possible that the VTEC maps could be improved significantly by using real GPS measurements from balloons of Project Loon in the near future.
Project Loon based augmentation for global ionospheric modeling over Southern Hemisphere
Wang, Cheng; Shi, Chuang; Zhang, Hongping
2017-01-01
Global ionospheric products of vertical total electron content (VTEC) derived from GNSS measurements may have low accuracy over oceans and southern latitudes where there are not rich observations. Project Loon provides a great opportunity to enhance the measurements over those areas. In this contribution, a simulation of Project Loon based augmentation for global ionospheric modeling is performed by using the international reference ionosphere (IRI) which could simulate VTEC measurements for the balloons. The performance of the enhanced method based on simulation of Project Loon is investigated by comparing with VTEC maps from Ionosphere Associate Analysis Centers (IAACs) as well as IGS final GIMs. The comparison indicates that there is a better consistency between the VTEC maps by the enhanced method and IGS final GIMs. Also, obvious improvements of RMS maps in GIMs for the middle latitudes and southern latitudes are enabled by the augmentation of Project Loon. Additionally, JASON data are used to validate the specific improvement of the VTEC maps. The results show that the performance of VTEC maps is improved slightly, especially in southern latitudes. It is possible that the VTEC maps could be improved significantly by using real GPS measurements from balloons of Project Loon in the near future. PMID:28383058
Minton, Deborah; Elias, Eileen; Rumrill, Phillip; Hendricks, Deborah J; Jacobs, Karen; Leopold, Anne; Nardone, Amanda; Sampson, Elaine; Scherer, Marcia; Gee Cormier, Aundrea; Taylor, Aiyana; DeLatte, Caitlin
2017-09-14
Project Career is a five-year interdisciplinary demonstration project funded by NIDILRR. It provides technology-driven supports, merging Cognitive Support Technology (CST) evidence-based practices and rehabilitation counseling, to improve postsecondary and employment outcomes for veteran and civilian undergraduate students with traumatic brain injury (TBI). Provide a technology-driven individualized support program to improve career and employment outcomes for students with TBI. Project staff provide assessments of students' needs relative to assistive technology, academic achievement, and career preparation; provide CST training to 150 students; match students with mentors; provide vocational case management; deliver job development and placement assistance; and maintain an electronic portal regarding accommodation and career resources. Participating students receive cognitive support technology training, academic enrichment, and career preparatory assistance from trained professionals at three implementation sites. Staff address cognitive challenges using the 'Matching Person with Technology' assessment to accommodate CST use (iPad and selected applications (apps)). JBS International (JBS) provides the project's evaluation. To date, 117 students participate with 63% report improved life quality and 75% report improved academic performance. Project Career provides a national model based on best practices for enabling postsecondary students with TBI to attain academic, employment, and career goals.
Nelson, Joan M; Cook, Paul F; Raterink, Ginger
2013-01-01
The past several years have seen explosive growth in the number of doctor of nursing practice (DNP) degree programs offered by colleges of nursing in the United States. Through a process of trial and error since 2005, the faculty at the University of Colorado, College of Nursing, have revised the course structure and procedures related to the DNP capstone project to improve the quality and usefulness of these student projects. Efforts have focused on educating and involving all nursing faculty in the DNP capstone process, distinguishing between competencies for our PhD and DNP projects, clearly aligning the DNP capstone project with quality improvement methods rather than with research, working with our campus institutional review board to clarify regulatory review requirements for quality improvement studies, developing a review committee to oversee DNP students' projects, and structuring our sequential course requirements to encourage students' professional presentations and publications. Our current capstone process reflects 7 years of iterative work, which we summarize in this article in hopes that it will help institutions currently in the process of developing a DNP program. Copyright © 2013 Elsevier Inc. All rights reserved.
Chartier, Lucas B; Cheng, Amy H Y; Stang, Antonia S; Vaillancourt, Samuel
2018-01-01
Emergency medicine (EM) providers work in a fast-paced and often hectic environment that has a high risk for patient safety incidents and gaps in the quality of care. These challenges have resulted in opportunities for frontline EM providers to play a role in quality improvement (QI) projects. QI has developed into a mature field with methodologies that can dramatically improve the odds of having a successful project with a sustainable impact. However, this expertise is not yet commonly taught during professional training. In this first of three articles meant as a QI primer for EM clinicians, we will introduce QI methodology and strategic planning using a fictional case study as an example. We will review how to identify a QI problem, define components of an effective problem statement, and identify stakeholders and core change team members. We will also describe three techniques used to perform root cause analyses-Ishikawa diagrams, Pareto charts and process mapping-and how they relate to preparing for a QI project. The next two papers in this series will focus on the execution of the QI project itself using rapid-cycle testing and on the evaluation and sustainability of QI projects.
Miami regional advanced traveler information system project : final evaluation report
DOT National Transportation Integrated Search
2002-04-01
In 1999 the U.S. Congress earmarked funds for selected projects that were assessed as supporting the improvements of transportation efficiency, promoting safety, increasing traffic flow, reducing emissions, improving traveler information, enhancing a...
Riverside County transit : ITS demonstration project : phase II evaluation final report
DOT National Transportation Integrated Search
2001-12-24
In 1999, the U.S. Congress earmarked funds for selected projects that were assessed as supporting improvements in transportation efficiency, promoting safety, increasing traffic flow, reducing emissions, improving traveler information, enhancing alte...
NASA Astrophysics Data System (ADS)
Tlhoaele, Malefyane; Suhre, Cor; Hofman, Adriaan
2016-05-01
Cooperative learning may improve students' motivation, understanding of course concepts, and academic performance. This study therefore enhanced a cooperative, group-project learning technique with technology resources to determine whether doing so improved students' deep learning and performance. A sample of 118 engineering students, randomly divided into two groups, participated in this study and provided data through questionnaires issued before and after the experiment. The results, obtained through analyses of variance and structural equation modelling, reveal that technology-enhanced, cooperative, group-project learning improves students' comprehension and academic performance.
Improving patient care through student leadership in team quality improvement projects.
Tschannen, Dana; Aebersold, Michelle; Kocan, Mary Jo; Lundy, Francene; Potempa, Kathleen
2015-01-01
In partnership with a major medical center, senior-level nursing students completed a root cause analysis and implementation plan to address a unit-specific quality issue. To evaluate the project, unit leaders were asked their perceptions of the value of the projects and impact on patient care, as well as to provide exemplars depicting how the student root cause analysis work resulted in improved patient outcome and/or unit processes. Liaisons noted benefits of having an RCA team, with positive impact on patient outcomes and care processes.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2005-06-01
This two-page performance spotlight describes how, in 2004, Austin Energy (the electric utility for the city of Austin, Texas) began saving about $1.2 million in energy and maintenance costs annually as a direct result of a pumping system efficiency project. The project was designed to improve the efficiency of the circulating water pumping system serving the utility's 405-MW steam turbine. A U.S. Department of Energy Qualified Pumping System Assessment Tool Specialist at Flowserve Corporation assisted in the initial assessment of the system.
Labor productivity, perceived effectiveness, and sustainability of innovative projects.
Makai, Peter; Cramm, Jane M; van Grotel, Marloes; Nieboer, Anna P
2014-01-01
To assess labor productivity, perceived effectiveness, and sustainability of a national quality program that sought to stimulate efficiency gains through increased labor productivity while maintaining quality through implementing small-scale innovation projects. Longitudinal measures of labor productivity and quality were collected at baseline and after completion of the innovation projects. Perceived effectiveness and sustainability (measured by routinization) were assessed cross-sectionally after project completion. This study was conducted in The Netherlands. Ninety-eight improvement projects in long-term care organizations. A national quality program to stimulate innovative approaches in long-term care. Labor productivity, perceived effectiveness, and sustainability were the main outcome measures. Labor productivity data were available for only 37 (38%) of the 98 projects, 33 (89%) of which demonstrated significantly improved efficiency. Perceived effectiveness was significantly associated with sustainability (0.29; p < .05), but not labor productivity. To achieve sustainability in long-term care, developers of innovative projects must collect better quality information on efficiency gains in terms of labor productivity and focus more on efficiency improvement. More research is necessary to explore relationships between labor productivity, perceived effectiveness, and sustainability. © 2012 National Association for Healthcare Quality.
Schonberger, Robert B; Barash, Paul G; Lagasse, Robert S
2015-08-01
Since 2006, the Surgical Care Improvement Project (SCIP) has promoted 3 perioperative antibiotic recommendations designed to reduce the incidence of surgical site infections. Despite good evidence for the efficacy of these recommendations, the efforts of SCIP have not measurably improved the rates of surgical site infections. We offer 3 arguments as to why SCIP has fallen short of expectations. We then suggest a reorientation of quality improvement efforts to focus less on reporting, and incentivizing adherence to imperfect metrics, and more on creating local and regional quality collaboratives to educate clinicians about how to improve practice. Ultimately, successful quality improvement projects are behavioral interventions that will only succeed to the degree that they motivate individual clinicians, practicing within a particular context, to do the difficult work of identifying failures and iteratively working toward excellence.
Schonberger, Robert B.; Barash, Paul G.; Lagasse, Robert S.
2015-01-01
Since 2006, the Surgical Care Improvement Project (SCIP) has promoted three perioperative antibiotic recommendations designed to reduce the incidence of surgical-site infections. Despite good evidence for the efficacy of these recommendations, SCIP's efforts have not measurably improved rates of surgical site-infections. We offer three arguments as to why SCIP has fallen-short of expectations. We then suggest a reorientation of quality improvement efforts to focus less on reporting, and incentivizing adherence to imperfect metrics, and more on creating local and regional quality collaboratives to educate clinicians about how to improve practice. Ultimately, successful quality improvement projects are behavioral interventions that will only succeed to the degree that they motivate individual clinicians, practicing within a particular context, to do the difficult work of identifying failures and iteratively working toward excellence. PMID:26197373
NASA high performance computing and communications program
NASA Technical Reports Server (NTRS)
Holcomb, Lee; Smith, Paul; Hunter, Paul
1993-01-01
The National Aeronautics and Space Administration's HPCC program is part of a new Presidential initiative aimed at producing a 1000-fold increase in supercomputing speed and a 100-fold improvement in available communications capability by 1997. As more advanced technologies are developed under the HPCC program, they will be used to solve NASA's 'Grand Challenge' problems, which include improving the design and simulation of advanced aerospace vehicles, allowing people at remote locations to communicate more effectively and share information, increasing scientist's abilities to model the Earth's climate and forecast global environmental trends, and improving the development of advanced spacecraft. NASA's HPCC program is organized into three projects which are unique to the agency's mission: the Computational Aerosciences (CAS) project, the Earth and Space Sciences (ESS) project, and the Remote Exploration and Experimentation (REE) project. An additional project, the Basic Research and Human Resources (BRHR) project exists to promote long term research in computer science and engineering and to increase the pool of trained personnel in a variety of scientific disciplines. This document presents an overview of the objectives and organization of these projects as well as summaries of individual research and development programs within each project.
Stille, Christopher J; Savageau, Judith A; McBride, Jeanne; Alper, Eric J
2012-01-01
Development of quality improvement (QI) skills and leadership for busy clinician-educators in academic medical centers is increasingly necessary, although it is challenging given limited resources. In response, the authors developed the Quality Scholars program for primary care teaching faculty. They conducted a needs assessment, evaluated existing internal and national resources, and developed a 9-month, 20-session project-based curriculum that combines didactic and hands-on techniques with facilitated project discussion. They also conducted pre-post tests of knowledge and attitudes, and evaluations of each session, scholars' projects, and program sustainability and costs. In all, 10 scholars from all 3 generalist disciplines comprised the first class. A wide spectrum of previous experiences enhanced collaboration. QI knowledge increased slightly, and reported self-readiness to lead QI projects increased markedly. Protected time for project work and group discussion of QI topics was seen as essential. All 10 scholars completed projects and presented results. Institutional leadership agreed to sustain the program using institutional funds.
Field Review of Fish Habitat Improvement Projects in Central Idaho.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Beschta, Robert L.; Griffith, Jack; Wesche, Thomas A.
1993-05-01
The goal of this field review was to provide information to the Bonneville Power Administration (BPA) regarding previous and ongoing fish habitat improvement projects in central Idaho. On July 14, 1992, the review team met at the Sawtooth National Recreation Area office near Ketchum, Idaho, for a slide presentation illustrating several habitat projects during their construction phases. Following the slide presentation, the review team inspected fish habitat projects that have been implemented in the last several years in the Stanley Basin and adjacent valleys. At each site the habitat project was described to the field team and a brief periodmore » for project inspection followed. The review team visited approximately a dozen sites on the Challis, Sawtooth, and Boise National Forests over a period of approximately two and a half days. There are two objectives of this review namely to summarize observations for specific field sites and to provide overview commentary regarding the BPA habitat improvement program in central Idaho.« less
Fan, Yeting; Jin, Xiaobin; Xiang, Xiaomin; Gan, Le; Yang, Xuhong; Zhang, Zhihong; Zhou, Yinkang
2018-01-01
Food security has always been a focus issue in China. Farmland consolidation (FC) was regarded as a critical way to increase the quantity and improve the quality of farmland to ensure food security by Chinese government. FC projects have been nationwide launched, however few studies focused on evaluating the effectiveness of FC at a national scale. As such, an efficient way to evaluate the effectiveness of FC on improving agricultural productivity in China will be needed and it is critical for future national land consolidation planning. In this study, we selected 7505 FC projects completed between 2006 and 2013 with good quality Normalized Difference Vegetation Index (NDVI) as samples to evaluate the effectiveness of FC. We used time-series Moderate Resolution Imaging Spectroradiometer NDVI from 2001 to 2013, to extract four indicators to characterize agricultural productivity change of 4442 FC projects completed between 2006 and 2010, i.e., productivity level (PL), productivity variation (PV), productivity potential (PP), and multi-cropping index (MI). On this basis, we further predicted the same four characteristics for 3063 FC projects completed between 2011 and 2013, respectively, using Support Vector Machines (SVM). We found FC showed an overall effective status on improving agricultural productivity between 2006 and 2013 in China, especially on upgrading PL and improving PP. The positive effect was more prominent in the southeast and eastern China. It is noteworthy that 27.30% of all the 7505 projects were still ineffective on upgrading PL, the elementary improvement of agricultural productivity. Finally, we proposed that location-specific factors should be taken into consideration for launching FC projects and diverse financial sources are also needed for supporting FC. The results provide a reference for government to arrange FC projects reasonably and to formulate land consolidation planning in a proper way that better improve the effectiveness of FC.
Xiang, Xiaomin; Gan, Le; Yang, Xuhong; Zhang, Zhihong; Zhou, Yinkang
2018-01-01
Food security has always been a focus issue in China. Farmland consolidation (FC) was regarded as a critical way to increase the quantity and improve the quality of farmland to ensure food security by Chinese government. FC projects have been nationwide launched, however few studies focused on evaluating the effectiveness of FC at a national scale. As such, an efficient way to evaluate the effectiveness of FC on improving agricultural productivity in China will be needed and it is critical for future national land consolidation planning. In this study, we selected 7505 FC projects completed between 2006 and 2013 with good quality Normalized Difference Vegetation Index (NDVI) as samples to evaluate the effectiveness of FC. We used time-series Moderate Resolution Imaging Spectroradiometer NDVI from 2001 to 2013, to extract four indicators to characterize agricultural productivity change of 4442 FC projects completed between 2006 and 2010, i.e., productivity level (PL), productivity variation (PV), productivity potential (PP), and multi-cropping index (MI). On this basis, we further predicted the same four characteristics for 3063 FC projects completed between 2011 and 2013, respectively, using Support Vector Machines (SVM). We found FC showed an overall effective status on improving agricultural productivity between 2006 and 2013 in China, especially on upgrading PL and improving PP. The positive effect was more prominent in the southeast and eastern China. It is noteworthy that 27.30% of all the 7505 projects were still ineffective on upgrading PL, the elementary improvement of agricultural productivity. Finally, we proposed that location-specific factors should be taken into consideration for launching FC projects and diverse financial sources are also needed for supporting FC. The results provide a reference for government to arrange FC projects reasonably and to formulate land consolidation planning in a proper way that better improve the effectiveness of FC. PMID:29874258
Wilper, Andrew P; Smith, Curtis Scott; Weppner, William
2013-01-01
Background The Accreditation Council for Graduate Medical Education (ACGME) requires that training programs integrate system-based practice (SBP) and practice-based learning and improvement (PBLI) into internal medicine residency curricula. Context and setting We instituted a seminar series and year-long-mentored curriculum designed to engage internal medicine residents in these competencies. Methods Residents participate in a seminar series that includes assigned reading and structured discussion with faculty who assist in the development of quality improvement or research projects. Residents pursue projects over the remainder of the year. Monthly works in progress meetings, protected time for inquiry, and continued faculty mentorship guide the residents in their project development. Trainees present their work at hospital-wide grand rounds at the end of the academic year. We performed a survey of residents to assess their self-reported knowledge, attitudes and skills in SBP and PBLI. In addition, blinded faculty scored projects for appropriateness, impact, and feasibility. Outcomes We measured resident self-reported knowledge, attitudes, and skills at the end of the academic year. We found evidence that participants improved their understanding of the context in which they were practicing, and that their ability to engage in quality improvement projects increased. Blinded faculty reviewers favorably ranked the projects' feasibility, impact, and appropriateness. The 'Curriculum of Inquiry' generated 11 quality improvement and research projects during the study period. Barriers to the ongoing work include a limited supply of mentors and delays due to Institutional Review Board approval. Hospital leadership recognizes the importance of the curriculum, and our accreditation manager now cites our ongoing work. Conclusions A structured residency-based curriculum facilitates resident demonstration of SBP and practice-based learning and improvement. Residents gain knowledge and skills though this enterprise and hospitals gain access to trainees who help to solve ongoing problems and meet accreditation requirements.
Improved Methodology for Benefit Estimation of Preservation Projects
DOT National Transportation Integrated Search
2018-04-01
This research report presents an improved process for evaluating the benefits and economic tradeoffs associated with a variety of highway preservation projects. It includes a summary of results from a comprehensive phone survey concerning the use and...
I-70 West Integration Project (fy 01 earmark) : local evaluation report
DOT National Transportation Integrated Search
2007-09-01
The I-70 West Integration Project is the result of an FY01 congressionally designated earmark to support improvements in transportation efficiency, promote safety, increase traffic flow, reduce emissions, improve traveler information dissemination, e...
DOT National Transportation Integrated Search
2007-11-09
The CTMC Integration Project is the result of FY01 congressionally designated earmarks to improve transportation efficiency, promote safety, increase traffic flow, reduce emissions, improve traveler information dissemination, enhance alternate transp...
Statewide Transportation Improvement Program 1997-2001
DOT National Transportation Integrated Search
1996-07-01
The Utah Department of Transportation's Statewide Transportation Improvement Plan (STIP) is a five-year program of highway and transit projects for the State of Utah. It is a compilation of projects utilizing various federal and state funding program...
This project will investigate total water management (TWM) as a way of improving water resource management and reducing waste streams. This project will also improve management of potable water, wastewater and wet-weather flow through combined management, reuse and recycling wil...
42 CFR 482.21 - Condition of participation: Quality assessment and performance improvement program.
Code of Federal Regulations, 2011 CFR
2011-10-01
... learning throughout the hospital. (3) The hospital must take actions aimed at performance improvement and... QIO cooperative project, but its own projects are required to be of comparable effort. (e) Standard...
Productivity improvement in engineering at Rocketdyne
NASA Technical Reports Server (NTRS)
Nordlund, R. M.; Vogt, S. T.; Woo, A. K.
1985-01-01
The Rocketdyne Division of Rockwell International has embarked on a productivity improvement program in engineering. This effort included participation in the White Collar Productivity Improvement (WCPI) project sponsored by the American Productivity Center. A number of things have been learned through this project. It seems that any productivity improvement project should be employee driven. The Rocketdyne project was essentially started as a result of a grassroots effort to remove some particular hindrances, and employee enthusiasm was a prime factor in the continuing progress of the effort. A significant result was that awareness of problems at all levels increased. Many issues surfaced in the diagnostic phase, and were then noted and discussed. This process added legitimacy to issues that had previously been merely unspoken concerns. The initial feelings of many members of the pilot group was that significant changes would occur relatively quickly. It is now recognized that this will have to be an ongoing, long-term effort.
Laycock, Alison; Bailie, Jodie; Matthews, Veronica; Cunningham, Frances; Harvey, Gillian; Percival, Nikki; Bailie, Ross
2017-07-13
Bringing together continuous quality improvement (CQI) data from multiple health services offers opportunities to identify common improvement priorities and to develop interventions at various system levels to achieve large-scale improvement in care. An important principle of CQI is practitioner participation in interpreting data and planning evidence-based change. This study will contribute knowledge about engaging diverse stakeholders in collaborative and theoretically informed processes to identify and address priority evidence-practice gaps in care delivery. This paper describes a developmental evaluation to support and refine a novel interactive dissemination project using aggregated CQI data from Aboriginal and Torres Strait Islander primary healthcare centres in Australia. The project aims to effect multilevel system improvement in Aboriginal and Torres Strait Islander primary healthcare. Data will be gathered using document analysis, online surveys, interviews with participants and iterative analytical processes with the research team. These methods will enable real-time feedback to guide refinements to the design, reports, tools and processes as the interactive dissemination project is implemented. Qualitative data from interviews and surveys will be analysed and interpreted to provide in-depth understanding of factors that influence engagement and stakeholder perspectives about use of the aggregated data and generated improvement strategies. Sources of data will be triangulated to build up a comprehensive, contextualised perspective and integrated understanding of the project's development, implementation and findings. The Human Research Ethics Committee (HREC) of the Northern Territory Department of Health and Menzies School of Health Research (Project 2015-2329), the Central Australian HREC (Project 15-288) and the Charles Darwin University HREC (Project H15030) approved the study. Dissemination will include articles in peer-reviewed journals, policy and research briefs. Results will be presented at conferences and quality improvement network meetings. Researchers, clinicians, policymakers and managers developing evidence-based system and policy interventions should benefit from this research. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2017. All rights reserved. No commercial use is permitted unless otherwise expressly granted.
ERIC Educational Resources Information Center
Guadalupe, Deana R.
Integrated Methods for Pupils to Reinforce Occupational and Vocational Effectiveness (Project IMPROVE) was a federally funded project in its second year of operation in two Manhattan (New York) high schools in 1992-93. It served limited-English-proficient students, 186 Latino and 13 Asian-American, in grades 9-12. Students received instruction in…
Bentley, Danielle Christine; Robinson, Andrea Cristina; Ruscitti, Robert Joseph
2015-01-01
With the growing volume of obtainable medical information and scientific literature, it is crucial that students in the field of allied health professions develop and refine the research skill set necessary to effectively find, retrieve, analyze, and use this information. This skill set can be effectively developed using student inquiry; an active learning process where students answer questions using research and data analysis. Therefore, with the pedagogical goal of developing information literacy among a cohort of allied health professional trainees, first year students studying human anatomy completed inquiry-based projects that were structured within the framework of the Information Search Process. This article thoroughly describes the conceptualization, creation, improvement, implementation, and assessment of the projects beginning with version one, the Student Inquiry Projects. Following a pilot of the Student Inquiry Projects various evidence-based improvements resulted in the final project version called the Inquiry Guided Learning Projects (IGLPs). A full assessment of the IGLPs revealed that students' self-perceived confidence improved for all tested research skills including: research question development, research question selection, exploration of peer-review literature, acquisition of resources, effective communication of results, and literature citation (all P < 0.05). Furthermore, six months following project completion students retained improved confidence in research question development and effective communication of results, with 90% of students indicating the IGLPs were directly responsible for these improvements. By guiding students through the Information Search Process, the IGLPs successfully developed research confidence among allied health trainees. © 2015 American Association of Anatomists.
Forest Tree Improvement Research in the South and Southeast
Keith W. Dorman
1966-01-01
The Committee on Southern Forest Tree improvement has directed its Subcommittee on Tree Selection and Breeding to summarize the projects by agencies doing forest tree improvement research in the South and Southeast. This area corresponds roughly to what is known as the southern pine region. The project summaries and the consolidated report were to be patterned after...
Quality initiatives: planning, setting up, and carrying out radiology process improvement projects.
Tamm, Eric P; Szklaruk, Janio; Puthooran, Leejo; Stone, Danna; Stevens, Brian L; Modaro, Cathy
2012-01-01
In the coming decades, those who provide radiologic imaging services will be increasingly challenged by the economic, demographic, and political forces affecting healthcare to improve their efficiency, enhance the value of their services, and achieve greater customer satisfaction. It is essential that radiologists master and consistently apply basic process improvement skills that have allowed professionals in many other fields to thrive in a competitive environment. The authors provide a step-by-step overview of process improvement from the perspective of a radiologic imaging practice by describing their experience in conducting a process improvement project: to increase the daily volume of body magnetic resonance imaging examinations performed at their institution. The first step in any process improvement project is to identify and prioritize opportunities for improvement in the work process. Next, an effective project team must be formed that includes representatives of all participants in the process. An achievable aim must be formulated, appropriate measures selected, and baseline data collected to determine the effects of subsequent efforts to achieve the aim. Each aspect of the process in question is then analyzed by using appropriate tools (eg, flowcharts, fishbone diagrams, Pareto diagrams) to identify opportunities for beneficial change. Plans for change are then established and implemented with regular measurements and review followed by necessary adjustments in course. These so-called PDSA (planning, doing, studying, and acting) cycles are repeated until the aim is achieved or modified and the project closed.
A residency clinic chronic condition management quality improvement project.
Halverson, Larry W; Sontheimer, Dan; Duvall, Sharon
2007-02-01
Quality improvement in chronic disease management is a major agenda for improving health and reducing health care costs. A six-component chronic disease management model can help guide this effort. Several characteristics of the "new model" of family medicine described by the Future of Family Medicine (FFM) Project Leadership Committee are promulgated to foster practice changes that improve quality. Our objective was to implement and assess a quality improvement project guided by the components of a chronic disease management model and FFM new model characteristics. Diabetes was selected as a model chronic disease focus. Multiple practice changes were implemented. A mature electronic medical record facilitated data collection and measurement of quality improvement progress. Data from the diabetes registry demonstrates that our efforts have been effective. Significant improvement occurred in five out of six quality indicators. Multidisciplinary teamwork in a model residency practice guided by chronic disease management principles and the FFM new model characteristics can produce significant management improvements in one important chronic disease.
Overview of Progress on the LANSCE Accelerator and Target Facilities Improvement Program
NASA Astrophysics Data System (ADS)
Macek, R. J.; Brun, T.; Donahue, J. B.; Fitzgerald, D. H.
1997-05-01
Three projects to improve the performance of the accelerator and target facilities for the Los Alamos Neutron Science Center have been initiated since 1994. The LANSCE Reliability Improvement Project was separated into two phases. Phase I, completed in 1995, was targeted at near-term improvements to beam availability that could be completed in a year. Phase II, now underway, consists of two projects: 1) converting the beam injection into the Proton Storage Ring (PSR) from the present two-step process H^- to H^0 to H^+) to direct injection of H^- beam in one step (H^- to H^+), and 2) an upgrade of the spallation neutron production target which will reduce the target change-out time from about a year to about three weeks. The third project, the SPSS Enhancement Project, is aimed at increasing the PSR output beam current from the present 70 μA at 20 Hz to 200 μA at 30 Hz, plus implementing seven new neutron scattering instruments. Objectives, plans, results and progress to date will be summarized.
Projection screen having reduced ambient light scattering
Sweatt, William C [Albuquerque, NM
2010-05-11
An apparatus and method for improving the contrast between incident projected light and ambient light reflected from a projection screen are described. The efficiency of the projection screen for reflection of the projected light remains high, while permitting the projection screen to be utilized in a brightly lighted room. Light power requirements from the projection system utilized may be reduced.
Creating quality improvement culture in public health agencies.
Davis, Mary V; Mahanna, Elizabeth; Joly, Brenda; Zelek, Michael; Riley, William; Verma, Pooja; Fisher, Jessica Solomon
2014-01-01
We conducted case studies of 10 agencies that participated in early quality improvement efforts. The agencies participated in a project conducted by the National Association of County and City Health Officials (2007-2008). Case study participants included health directors and quality improvement team leaders and members. We implemented multiple qualitative analysis processes, including cross-case analysis and logic modeling. We categorized agencies according to the extent to which they had developed a quality improvement culture. Agencies were conducting informal quality improvement projects (n = 4), conducting formal quality improvement projects (n = 3), or creating a quality improvement culture (n = 4). Agencies conducting formal quality improvement and creating a quality improvement culture had leadership support for quality improvement, participated in national quality improvement initiatives, had a greater number of staff trained in quality improvement and quality improvement teams that met regularly with decision-making authority. Agencies conducting informal quality improvement were likely to report that accreditation is the major driver for quality improvement work. Agencies creating a quality improvement culture were more likely to have a history of evidence-based decision-making and use quality improvement to address emerging issues. Our findings support previous research and add the roles of national public health accreditation and emerging issues as factors in agencies' ability to create and sustain a quality improvement culture.
Cañada Dorado, A; Cárdenas Valladolid, J; Espejo Matorrales, F; García Ferradal, I; Sastre Páez, S; Vicente Martín, I
2010-01-01
To describe a project carried out in order to improve the process of Continuous Health Care (CHC) on Saturdays and bank holidays in Primary Care, area number 4, Madrid. The aim of this project was to guarantee a safe and error-free service to patients receiving home health care on weekends. The urgent need for improving CHC process was identified by the Risk Management Functional Unit (RMFU) of the area. In addition, some complaints had been received from the nurses involved in the process as well as from their patients. A SWOT (Strengths, Weaknesses, Opportunities and Threats) analysis performed in 2009 highlighted a number of problems with the process. As a result, a project for improvement was drawn up, to be implemented in the following stages: 1. Redesigning and improving the existing process. 2. Application of failure mode and effect analysis (FMEA) to the new process. 3. Follow up, managing and leading the project. 4. Nurse training. 5. Implementing the process in the whole area. 6. CHC nurse satisfaction surveys. After carrying out this project, the efficiency and level of automation improved considerably. Since implementation of the process enhancement measures, no complaints have been received from patients and surveys show that CHC nurse satisfaction has improved. By using FMEA, errors were given priority and enhancement steps were taken in order to: Inform professionals, back-up personnel and patients about the process. Improve the specialist follow-up report. Provide training in ulcer patient care. The process enhancement, and especially its automation, has resulted in a significant step forward toward achieving greater patient safety. FMEA was a useful tool, which helped in taking some important actions. Finally, CHC nurse satisfaction has clearly improved. Copyright © 2009 SECA. Published by Elsevier Espana. All rights reserved.
An improvement project within urological care.
Khatami, Annelie; Rosengren, Kristina
2015-01-01
The purpose of this paper is to describe staff experiences in an on-going improvement project regarding patients with ureteral stones. A qualitative descriptive study based on eight group interviews and 48 narratives, was performed. Data were analysed using qualitative content analysis. Trustworthiness was ensured by using a well-documented improvement process method during six months. The results formed three categories: an absent comprehensive view; complexity; and vulnerability within the organisation. A holistic perspective regarding urological care at the micro-, meso- and macro-levels is needed to improve planning and caring processes. This study includes one team (six members, different health professionals) within the same urology department. Results show that staff need information, such as guidelines and support throughout the improvement work to deliver high-quality care. Moreover, there is a need for evidence-based guidelines at national level to support improvement work. Healthcare staff need to pay attention to all team member needs to improve urological care. Organisational and managerial aspect are needed to support clear and common goals regarding healthcare improvement work. Urological improvement projects, generally, are lacking, which is why this study is important to improve nephrolithiasis patient care.
NASA Technical Reports Server (NTRS)
Michaels, Jeffrey
1994-01-01
These Program/Project Management Resource Lists were originally written for the NASA project management community. Their purpose was to promote the use of the NASA Headquarters Library Program/Project Management Collection funded by NASA Headquarters Code FT, Training & Development Division, by offering introductions to the management topics studied by today's managers. Lists were also written at the request of NASA Headquarters Code T, Office of Continual improvements, and at the request of NASA members of the National Performance Review. This is the second edition of the compilation of these bibliographies; the first edition was printed in March 1994.
7 CFR 4288.11 - Eligible project costs.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 15 2013-01-01 2013-01-01 false Eligible project costs. 4288.11 Section 4288.11... Eligible Biorefineries § 4288.11 Eligible project costs. Eligible project costs will be only for project related construction costs for repowering improvements associated with the equipment, installation...
7 CFR 4288.11 - Eligible project costs.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 15 2014-01-01 2014-01-01 false Eligible project costs. 4288.11 Section 4288.11... Eligible Biorefineries § 4288.11 Eligible project costs. Eligible project costs will be only for project related construction costs for repowering improvements associated with the equipment, installation...
7 CFR 4288.11 - Eligible project costs.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 15 2012-01-01 2012-01-01 false Eligible project costs. 4288.11 Section 4288.11... Eligible Biorefineries § 4288.11 Eligible project costs. Eligible project costs will be only for project related construction costs for repowering improvements associated with the equipment, installation...
Improving Project Management with Simulation and Completion Distribution Functions
NASA Technical Reports Server (NTRS)
Cates, Grant R.
2004-01-01
Despite the critical importance of project completion timeliness, management practices in place today remain inadequate for addressing the persistent problem of project completion tardiness. A major culprit in late projects is uncertainty, which most, if not all, projects are inherently subject to. This uncertainty resides in the estimates for activity durations, the occurrence of unplanned and unforeseen events, and the availability of critical resources. In response to this problem, this research developed a comprehensive simulation based methodology for conducting quantitative project completion time risk analysis. It is called the Project Assessment by Simulation Technique (PAST). This new tool enables project stakeholders to visualize uncertainty or risk, i.e. the likelihood of their project completing late and the magnitude of the lateness, by providing them with a completion time distribution function of their projects. Discrete event simulation is used within PAST to determine the completion distribution function for the project of interest. The simulation is populated with both deterministic and stochastic elements. The deterministic inputs include planned project activities, precedence requirements, and resource requirements. The stochastic inputs include activity duration growth distributions, probabilities for events that can impact the project, and other dynamic constraints that may be placed upon project activities and milestones. These stochastic inputs are based upon past data from similar projects. The time for an entity to complete the simulation network, subject to both the deterministic and stochastic factors, represents the time to complete the project. Repeating the simulation hundreds or thousands of times allows one to create the project completion distribution function. The Project Assessment by Simulation Technique was demonstrated to be effective for the on-going NASA project to assemble the International Space Station. Approximately $500 million per month is being spent on this project, which is scheduled to complete by 2010. NASA project stakeholders participated in determining and managing completion distribution functions produced from PAST. The first result was that project stakeholders improved project completion risk awareness. Secondly, using PAST, mitigation options were analyzed to improve project completion performance and reduce total project cost.
Coe, Ryan L; Seibel, Eric J
2013-09-01
We present theoretical and experimental results of axial displacement of objects relative to a fixed condenser focal plane (FP) in optical projection tomographic microscopy (OPTM). OPTM produces three-dimensional, reconstructed images of single cells from two-dimensional projections. The cell rotates in a microcapillary to acquire projections from different perspectives where the objective FP is scanned through the cell while the condenser FP remains fixed at the center of the microcapillary. This work uses a combination of experimental and theoretical methods to improve the OPTM instrument design.
1988-03-01
INDUSTRY ANALYSIS/FINDINGS 132 12 EQUIPMENT/MACHINERY ALTERNATIVES 134 13 MIS REQUIREMENTS/IMPROVEMENTS 135 14 COST BENEFIT ANALYSIS AND PROCEDURE 137 15...SOFTWARE DIAGRAM 14.0-1 COST BENEFIT ANALYSIS METHODOLOGY 138 14.3-1 PROJECT 80 EXPENDITURE SCHEDULE 141 14.4-1 PROJECT 80 CASH FLOWS 142 15.1-1 PROJECT 80...testing, streamlining work flow, and installation of ergonomically designed work cell/work centers. The benefits associated with the implementation of ITM
Evaluating success levels of mega-projects
NASA Technical Reports Server (NTRS)
Kumaraswamy, Mohan M.
1994-01-01
Today's mega-projects transcend the traditional trajectories traced within national and technological limitations. Powers unleashed by internationalization of initiatives, in for example space exploration and environmental protection, are arguably only temporarily suppressed by narrower national, economic, and professional disagreements as to how best they should be harnessed. While the world gets its act together there is time to develop the technologies of such supra-mega-project management that will synergize truly diverse resources and smoothly mesh their interfaces. Such mega-projects and their management need to be realistically evaluated, when implementing such improvements. This paper examines current approaches to evaluating mega-projects and questions the validity of extrapolations to the supra-mega-projects of the future. Alternatives to improve such evaluations are proposed and described.
Improvement of Project Portfolio Management in an Information Technology Consulting Company
NASA Astrophysics Data System (ADS)
Kaewta, S.; Chutima, P.
2014-06-01
The scope of this research is to improve the efficiency of multiple project management in an information technology consulting company through the adaptation of the project portfolio management technique. The project management information system (PMIS) is implemented to establish effective communication channels so that internal and external teams as well as all relevant stakeholders can be employed to negotiate their work schedules. In addition, all activities created by multiple teams can be systematically reviewed and combined into a single checklist to be used as an agreed working plan for all team members. A general guideline for project portfolio management in information technology consulting companies is also proposed, which could results in a higher level of project on-time delivery.
Sutton, Elizabeth; Dixon-Woods, Mary; Tarrant, Carolyn
2016-08-04
Quality improvement projects to address transitions of care across care boundaries are increasingly common but meet with mixed success for reasons that are poorly understood. We aimed to characterise challenges in a project to improve transitions for older people between hospital and care homes. Independent process evaluation, using ethnographic observations and interviews, of a quality improvement project. An English hospital and two residential care homes for older people. 32 hours of non-participant observations and 12 semistructured interviews with project members, hospital and care home staff. A hospital-based improvement team sought to reduce unplanned readmissions from residential care homes using interventions including a community-based geriatric team that could be accessed directly by care homes and a communication tool intended to facilitate transfer of information between homes and hospital. Only very modest (if any) impacts of these interventions on readmission rates could be detected. The process evaluation identified multiple challenges in implementing interventions and securing improvement. Many of these arose because of lack of consensus on the nature of the problem and the proper solutions: while the hospital team was keen to reduce readmissions and saw the problems as lying in poor communication and lack of community-based support for care homes, the care home staff had different priorities. Care home staff were unconvinced that the improvement interventions were aligned with their needs or addressed their concerns, resulting in compromised implementation. Process evaluations have a valuable role in quality improvement. Our study suggests that a key task for quality improvement projects aimed at transitions of care is that of developing a shared view of the problem to be addressed. A more participatory approach could help to surface assumptions, interpretations and interests and could facilitate the coproduction of solutions. This finding is likely to have broader applicability. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/
Applications for improved inventory management for public transit systems
DOT National Transportation Integrated Search
2001-01-01
This report documents and presents the results of a Testing and Demonstration (T&D) Project on applications for improved inventory management for public transit systems. This project is a follow-up to an earlier study on inventory management for bus ...
Improvements in Ice-Sheet Sea-Level Projections
NASA Technical Reports Server (NTRS)
Shepherd, Andrew; Nowicki, Sophie
2017-01-01
Ice losses from Antarctica and Greenland are the largest uncertainty in sea-level projections. Nevertheless, improvements in ice-sheet models over recent decades have led to closer agreement with satellite observations, keeping track with their increasing contribution to global sea-level rise.
Improved business driveway delineation in urban work zones.
DOT National Transportation Integrated Search
2015-04-01
This report documents the efforts and results of a two-year research project aimed at improving driveway : delineation in work zones. The first year of the project included a closed-course study to identify the most : promising driveway delineation a...
West Virginia peer exchange : streamlining highway safety improvement program project delivery.
DOT National Transportation Integrated Search
2015-01-01
The West Virginia Division of Highways (WV DOH) hosted a Peer Exchange to share information and experiences : for streamlining Highway Safety Improvement Program (HSIP) project delivery. The event was held September : 22 to 23, 2014 in Charleston, We...
Land Acquisition and Relocation Assistance for Airport Improvement Program (AIP) Assisted Projects
DOT National Transportation Integrated Search
2017-07-10
This advisory circular (AC) provides guidance to sponsors of airport projects developed under the Airport Improvement Program (AIP) to meet the requirements of the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 (Pl 9...
36 CFR 222.1 - Authority and definitions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Grasslands, Land Utilization Projects, and other Federal lands for which the Forest Service has...-ground expenditure means payment of direct project costs of implementing an improvement or development...: (i) Non-structural which are practices and treatments undertaken to improve range not involving...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lamers, M.D.
One of the key needs in the advancement of geothermal energy is availability of adequate subsurface measurements to aid the reservoir engineer in the development and operation of geothermal wells. Some current projects being sponsored by the U. S. Department of Energy's Division of Geothermal Energy pertaining to the development of improved well logging techniques, tools and components are described. An attempt is made to show how these projects contribute to improvement of geothermal logging technology in forming key elements of the overall program goals.
NASA Astrophysics Data System (ADS)
Yang, Fuqiang; Zhang, Dinghua; Huang, Kuidong; Gao, Zongzhao; Yang, YaFei
2018-02-01
Based on the discrete algebraic reconstruction technique (DART), this study aims to address and test a new improved algorithm applied to incomplete projection data to generate a high quality reconstruction image by reducing the artifacts and noise in computed tomography. For the incomplete projections, an augmented Lagrangian based on compressed sensing is first used in the initial reconstruction for segmentation of the DART to get higher contrast graphics for boundary and non-boundary pixels. Then, the block matching 3D filtering operator was used to suppress the noise and to improve the gray distribution of the reconstructed image. Finally, simulation studies on the polychromatic spectrum were performed to test the performance of the new algorithm. Study results show a significant improvement in the signal-to-noise ratios (SNRs) and average gradients (AGs) of the images reconstructed from incomplete data. The SNRs and AGs of the new images reconstructed by DART-ALBM were on average 30%-40% and 10% higher than the images reconstructed by DART algorithms. Since the improved DART-ALBM algorithm has a better robustness to limited-view reconstruction, which not only makes the edge of the image clear but also makes the gray distribution of non-boundary pixels better, it has the potential to improve image quality from incomplete projections or sparse projections.
Defining a Progress Metric for CERT RMM Improvement
2017-09-14
Table 1) should be used along with clear guidance on what is to be measured, to avoid subjective interpretations by different project managers . In some...products for each CERT-RMM practice. Project managers should be trained to help the organization improve the accuracy and consistency of its reporting...and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. 1. AGENCY USE ONLY (Leave Blank) 2
Integrated Modeling and Analysis of Physical Oceanographic and Acoustic Processes
2015-09-30
goal is to improve ocean physical state and acoustic state predictive capabilities. The goal fitting the scope of this project is the creation of... Project -scale objectives are to complete targeted studies of oceanographic processes in a few regimes, accompanied by studies of acoustic propagation...by the basic research efforts of this project . An additional objective is to develop improved computational tools for acoustics and for the
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kosonen, M.; Hakola, M.
2012-07-01
Teollisuuden Voima Oyj (TVO) is a non-listed public company founded in 1969 to produce electricity for its stakeholders. TVO is the operator of the Olkiluoto nuclear power plant. TVO follows the principle of continuous improvement in the operation and maintenance of the Olkiluoto plant units. The PELE project (Plant Efficiency Improvement and Lifetime Extension), mainly completed during the annual outages in 2010 and 2011, and forms one part of the systematic development of Olkiluoto units. TVO maintains a long-term development program that aims at systematically modernizing the plant unit systems and equipment based on the latest technology. According to themore » program, the Olkiluoto 1 and Olkiluoto 2 plant units are constantly renovated with the intention of keeping them safe and reliable, The aim of the modernization projects is to improve the safety, reliability, and performance of the plant units. PELE project at Olkiluoto 1 was done in 2010 and at Olkiluoto 2 in 2011. The outage length of Olkiluoto 1 was 26 d 12 h 4 min and Olkiluoto 2 outage length was 28 d 23 h 46 min. (Normal service-outage is about 14 days including refueling and refueling-outage length is about seven days. See figure 1) The PELE project consisted of several single projects collected into one for coordinated project management. Some of the main projects were as follows: - Low pressure turbines: rotor, stator vane, casing and turbine instrumentation replacement. - Replacement of Condenser Cooling Water (later called seawater pumps) pumps - Replacement of inner isolation valves on the main steam lines. - Generator and the generator cooling system replacement. - Low voltage switchgear replacement. This project will continue during future outages. PELE was a success. 100 TVO employees and 1500 subcontractor employees participated in the project. The execution of the PELE projects went extremely well during the outages. The replacement of the low pressure turbines and seawater pumps improved the efficiency of the plant units, and a power increase of nearly 20 MW was achieved at both plant units. PELE wonderfully manifests one of the strategic goals of our company; developing the competence of our in-house personnel by working in projects. (authors)« less
Traditional Project Management and the Visual Workplace Environment to Improve Project Success
ERIC Educational Resources Information Center
Fichera, Christopher E.
2016-01-01
A majority of large IT projects fail to meet scheduled deadlines, are over budget and do not satisfy the end user. Many projects fail in spite of utilizing traditional project management techniques. Research of project management has not identified the use of a visual workspace as a feature affecting or influencing the success of a project during…
ERIC Educational Resources Information Center
California Community Colleges, Sacramento. Office of the Chancellor.
One of a series of papers resulting from a Fund for the Improvement of Postsecondary Education (FIPSE) project to improve evaluation and planning in community colleges, this working paper presents a plan of purposes and activities to experimentally test a model of delineation of responsibilities among accrediting commissions, state agencies, and…
ERIC Educational Resources Information Center
Advanced Technology, Inc., Reston, VA.
Stage Two of the Title IV Quality Control Project is an integrated study of quality in five related Federal financial aid programs for postsecondary students. Section 1 of the paper establishes a framework for defining quality improvements, in order to identify the types of changes that would tend to improve quality across all facets of the…
Dückers, Michel L A; Stegeman, Inge; Spreeuwenberg, Peter; Wagner, Cordula; Sanders, Karin; Groenewegen, Peter P
2009-08-01
The success of a Dutch program to disseminate quality improvement projects depends on the participation of physicians working in program hospitals. The leadership of hospital executives (CEOs) is considered an important explanation. This study aims to determine whether the relation, between the extent to which physicians notice their CEOs stimulate improvement initiatives and the number of projects joined by physicians, is moderated by the consensus among physicians working in the same hospital. Multilevel analyses are applied on data of 286 physicians from eight hospitals to: (1) estimate whether participation depends on noticing if CEOs stimulate improvement, (2) test if an individual's participation differs when more colleagues have the same opinion (effect modification). Significant moderator effects are found. The participation of physicians, noticing that CEOs stimulate improvement is higher when more colleagues share this opinion. For physicians not knowing whether improvement is encouraged, higher consensus coincides with lower participation. Project involvement of physicians depends on their consensus about encouragement by CEOs. This confirms the importance of strategic leaders in dissemination programs. Further research is recommended into causes of CEO leadership visibility and methods to strengthen leadership climate.
Implementing Six Sigma in The Netherlands.
van den Heuvel, Jaap; Does, Ronald J M M; Bogers, Ad J J C; Berg, Marc
2006-07-01
Six Sigma, a process-focused strategy and methodology for business improvement, can be used to improve care processes, eliminate waste, reduce costs, and enhance patient satisfaction. Six Sigma was introduced in 2001 at the 384-bed Red Cross Hospital (Beverwijk). During the Green Belt training, every participant was required to participate in at least one Six Sigma project. The hospital's total savings in 2004 amounted to 1.4 million dollars, for an average savings of 67,000 dollars for each of the completed 21 projects. In one project, the team designed a new admission process for the operating rooms, resulting in an average starting time nine minutes earlier. This relatively minor improvement made it possible to operate on an additional 400 patients a year and to achieve a net savings of >273,000 dollars. A second project reduced the number of patients receiving intravenous (IV) antibiotics by switching to oral administration, yielding annual savings, based on medication costs alone, of >75,000 dollars. A third project reduced the length of stay in the delivery room from 11.9 to 3.4 hours, yielding an annual savings of 68,000 dollars. The "Ultimate Cure?": Six Sigma, which entails involvement of health care workers; use of improvement tools (from industry); creation of trained project teams to tackle complex, often cross-departmental processes; data analyses; and investment in quality improvement may prove the "ultimate cure" to the current cost, quality, and safety issues that challenge health care.
Projections onto the Pareto surface in multicriteria radiation therapy optimization
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bokrantz, Rasmus, E-mail: bokrantz@kth.se, E-mail: rasmus.bokrantz@raysearchlabs.com; Miettinen, Kaisa
2015-10-15
Purpose: To eliminate or reduce the error to Pareto optimality that arises in Pareto surface navigation when the Pareto surface is approximated by a small number of plans. Methods: The authors propose to project the navigated plan onto the Pareto surface as a postprocessing step to the navigation. The projection attempts to find a Pareto optimal plan that is at least as good as or better than the initial navigated plan with respect to all objective functions. An augmented form of projection is also suggested where dose–volume histogram constraints are used to prevent that the projection causes a violation ofmore » some clinical goal. The projections were evaluated with respect to planning for intensity modulated radiation therapy delivered by step-and-shoot and sliding window and spot-scanned intensity modulated proton therapy. Retrospective plans were generated for a prostate and a head and neck case. Results: The projections led to improved dose conformity and better sparing of organs at risk (OARs) for all three delivery techniques and both patient cases. The mean dose to OARs decreased by 3.1 Gy on average for the unconstrained form of the projection and by 2.0 Gy on average when dose–volume histogram constraints were used. No consistent improvements in target homogeneity were observed. Conclusions: There are situations when Pareto navigation leaves room for improvement in OAR sparing and dose conformity, for example, if the approximation of the Pareto surface is coarse or the problem formulation has too permissive constraints. A projection onto the Pareto surface can identify an inaccurate Pareto surface representation and, if necessary, improve the quality of the navigated plan.« less
NASA High Performance Computing and Communications program
NASA Technical Reports Server (NTRS)
Holcomb, Lee; Smith, Paul; Hunter, Paul
1994-01-01
The National Aeronautics and Space Administration's HPCC program is part of a new Presidential initiative aimed at producing a 1000-fold increase in supercomputing speed and a 1(X)-fold improvement in available communications capability by 1997. As more advanced technologies are developed under the HPCC program, they will be used to solve NASA's 'Grand Challenge' problems, which include improving the design and simulation of advanced aerospace vehicles, allowing people at remote locations to communicate more effectively and share information, increasing scientists' abilities to model the Earth's climate and forecast global environmental trends, and improving the development of advanced spacecraft. NASA's HPCC program is organized into three projects which are unique to the agency's mission: the Computational Aerosciences (CAS) project, the Earth and Space Sciences (ESS) project, and the Remote Exploration and Experimentation (REE) project. An additional project, the Basic Research and Human Resources (BRHR) project, exists to promote long term research in computer science and engineering and to increase the pool of trained personnel in a variety of scientific disciplines. This document presents an overview of the objectives and organization of these projects, as well as summaries of early accomplishments and the significance, status, and plans for individual research and development programs within each project. Areas of emphasis include benchmarking, testbeds, software and simulation methods.
SU-C-207-04: Reconstruction Artifact Reduction in X-Ray Cone Beam CT Using a Treatment Couch Model
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lasio, G; Hu, E; Zhou, J
2015-06-15
Purpose: to mitigate artifacts induced by the presence of the RT treatment couch in on-board CBCT and improve image quality Methods: a model of a Varian IGRT couch is constructed using a CBCT scan of the couch in air. The model is used to generate a set of forward projections (FP) of the treatment couch at specified gantry angles. The model couch forward projections are then used to process CBCT scan projections which contain the couch in addition to the scan object (Catphan phantom), in order to remove the attenuation component of the couch at any given gantry angle. Priormore » to pre-processing with the model FP, the Catphan projection data is normalized to an air scan with bowtie filter. The filtered Catphan projections are used to reconstruct the CBCT with an in-house FDK algorithm. The artifact reduction in the processed CBCT scan is assessed visually, and the image quality improvement is measured with the CNR over a few selected ROIs of the Catphan modules. Results: Sufficient match between the forward projected data and the x-ray projections is achieved to allow filtering in attenuation space. Visual improvement of the couch induced artifacts is achieved, with a moderate expense of CNR. Conclusion: Couch model-based correction of CBCT projection data has a potential for qualitative improvement of clinical CBCT scans, without requiring position specific correction data. The technique could be used to produce models of other artifact inducing devices, such as immobilization boards, and reduce their impact on patient CBCT images.« less
Project Future Workplace Literacy Project. Final Performance Report.
ERIC Educational Resources Information Center
Jefferson County Public Schools, Louisville, KY.
Project Future was a 3-year project begun in 1994 as a partnership between the Jefferson County Public Schools and Futura Plastics and Engineering, Inc., Louisville, Kentucky. The project targeted the workplace basic skills of plastic injection molding production workers. The skills classes improved the general education of the workers with…
ERIC Educational Resources Information Center
Arantes do Amaral, Joao Alberto; Gonçalves, Paulo; Hess, Aurélio
2015-01-01
This article describes the project-based learning environment created to support project management graduate courses. The paper will focus on the learning context and procedures followed for 13 years, in 47 project-based learning MBA courses, involving approximately 1,400 students and 34 community partners.
7 CFR 4280.122 - Project eligibility.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 15 2010-01-01 2010-01-01 false Project eligibility. 4280.122 Section 4280.122... Efficiency Improvements Program Section B. Guaranteed Loans § 4280.122 Project eligibility. For a project to be eligible to receive a guaranteed loan under this subpart, the project must meet each of the...
Identifying strategies to improve the effectiveness of booster seat laws
DOT National Transportation Integrated Search
2008-05-01
The objective of this project was to identify strategies to improve the effectiveness of booster seat laws. The project explored the possible factors that relate to the use and nonuse of booster seats, and examined the attitudes of law enforcement of...
Town of Chino Valley Municipal Water System Improvement Project FONSI and EA
EPA Region 9 has prepared an Environmental Assessment (EA) describing the potential environmental impacts associated with, and the alternatives to, the proposed Water System Improvement Project in the town of China Valley, Arizona. This Finding of No Signi
76 FR 78252 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-16
..., Rubicon Trail Easement and Resource Improvement Project, Construction and Operation, Right-of-Way Grant...: Andrea Catanzaro (409) 766-6346 EIS No. 20110421, Draft EIS, USFS, CA, Greys Mountain Ecological...--La Crosse Transmission System Improvement Project, Proposed Construction and Operation of a 345...
MO-F-211-01: Methods for Completing Practice Quality Improvement (PQI).
Johnson, J; Brown, K; Ibbott, G; Pawlicki, T
2012-06-01
Practice Quality Improvement (PQI) is becoming an expected part of routine practice in healthcare as an approach to provide more efficient, effective and high quality care. Additionally, as part of the ABR's Maintenance of Certification (MOC) pathway, medical physicists are now expected to complete a PQI project. This session will describe the history behind and benefits of the ABR's MOC program, provide details of quality improvement methods and how to successfully complete a PQI project. PQI methods include various commonly used engineering and management tools. The Plan-Do-Study-Act (PDSA) cycle will be presented as one project planning and implementation tool. Other PQI analysis instruments such as flowcharts, Pareto charts, process control charts and fishbone diagrams will also be explained with examples. Cause analysis, solution development and implementation, and post-implementation measurement will be presented. Project identification and definition as well as appropriate measurement tool selection will be offered. Methods to choose key quality metrics (key quality indicators) will also be addressed. Several sample PQI projects and templates available through the AAPM and other organizations will be described. At least three examples of completed PQI projects will be shared. 1. Identify and define a PQI project 2. Identify and select measurement methods/techniques for use with the PQI project 3. Describe example(s) of completed projects. © 2012 American Association of Physicists in Medicine.
Bannon, Olly; Greenwood, Emma
2017-12-01
: In recent years the RVH Emergency Department (ED) had been under intense pressure and public scrutiny. This led to a demoralised workforce who had become disengaged with quality improvement (QI). QI projects had become an exercise in data collection with little focus on improving care for patients.Two consultants undertook training in QI and then decided to develop a QI project aiming to empower staff and embed QI as daily practice. An ED QI steering group of interested multidisciplinary members was formed and devised an improvement plan to increase staff engagement with QI.The steering group secured funding for a subscription to the Institute of Healthcare Improvement (IHI) online open school. This was made available to 50 staff and was used to increase knowledge of QI methodology. An aim of 250 open school modules completed by August 2017 was set. This total was surpassed in June 2017, amounting to over 330 hours of QI training undertaken in staff's own time. To date 13 staff members have achieved IHI Certificates in Quality and Safety.We designed a series of projects which were linked with the Trust Improvement plan. The QI teams are all multidisciplinary with medical and nursing staff from different grades involved in each as well as input from other professionals such as pharmacy, physio and clerical/admin staff.emermed;34/12/A880-a/F1F1F1Figure 1Through the delivery of this project the ED team's enthusiasm for QI has been reinvigorated. We have demonstrated improvements in clinical standards such as pain management where a project was undertaken, which has seen a 4 fold increase in the number of patient's who sustain a fractured hip receiving the gold standard treatment of fascia iliaca nerve block.We have shown improvements in communication with the 'Unfinished Symphony' project demonstrating significantly better ED/GP written handover correspondance and the 'What's in a name' project decreasing inter-specialty conflict during the referral process. We have also increased efficiency with senior review for Ambulance patients and subsequent significant decrease in waiting times. A recent project targeting the waste associated with unnessecary triage blood tests is showing promising early results.emermed;34/12/A880-a/F2F2F2Figure 2The ED improvement team have endeavoured to improve the environment for staff by developing a 'Grrr to Great' board, through which staff are empowered to highlight problems but are also tasked with developing solutions. We have also increased accessibility of QI data by producing a QI update board and displaying data openly and transparently in the department.emermed;34/12/A880-a/F3F3F3Figure 3. © 2017, Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.
Healthcare quality measurement in orthopaedic surgery: current state of the art.
Auerbach, Andrew
2009-10-01
Improving quality of care in arthroplasty is of increasing importance to payors, hospitals, surgeons, and patients. Efforts to compel improvement have traditionally focused measurement and reporting of data describing structural factors, care processes (or 'quality measures'), and clinical outcomes. Reporting structural measures (eg, surgical case volume) has been used with varying degrees of success. Care process measures, exemplified by initiatives such as the Surgical Care Improvement Project measures, are chosen based on the strength of randomized trial evidence linking the process to improved outcomes. However, evidence linking improved performance on Surgical Care Improvement Project measures with improved outcomes is limited. Outcome measures in surgery are of increasing importance as an approach to compel care improvement with prominent examples represented by the National Surgical Quality Improvement Project. Although outcomes-focused approaches are often costly, when linked to active benchmarking and collaborative activities, they may improve care broadly. Moreover, implementation of computerized data systems collecting information formerly collected on paper only will facilitate benchmarking. In the end, care will only be improved if these data are used to define methods for innovating care systems that deliver better outcomes at lower or equivalent costs.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Germain, Shawn St.; Farris, Ronald
2014-09-01
Advanced Outage Control Center (AOCC), is a multi-year pilot project targeted at Nuclear Power Plant (NPP) outage improvement. The purpose of this pilot project is to improve management of NPP outages through the development of an AOCC that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This report documents the results of a benchmarking effort to evaluate the transferability of technologies demonstrated at Idaho National Laboratory and the primary pilot project partner, Palo Verde Nuclear Generating Station. The initial assumption for this pilot project was that NPPs generally domore » not take advantage of advanced technology to support outage management activities. Several researchers involved in this pilot project have commercial NPP experience and believed that very little technology has been applied towards outage communication and collaboration. To verify that the technology options researched and demonstrated through this pilot project would in fact have broad application for the US commercial nuclear fleet, and to look for additional outage management best practices, LWRS program researchers visited several additional nuclear facilities.« less
(abstract) Mission Operations and Control Assurance: Flight Operations Quality Improvements
NASA Technical Reports Server (NTRS)
Welz, Linda L.; Bruno, Kristin J.; Kazz, Sheri L.; Witkowski, Mona M.
1993-01-01
Mission Operations and Command Assurance (MO&CA), a recent addition to flight operations teams at JPL. provides a system level function to instill quality in mission operations. MO&CA's primary goal at JPL is to help improve the operational reliability for projects during flight. MO&CA tasks include early detection and correction of process design and procedural deficiencies within projects. Early detection and correction are essential during development of operational procedures and training of operational teams. MO&CA's effort focuses directly on reducing the probability of radiating incorrect commands to a spacecraft. Over the last seven years at JPL, MO&CA has become a valuable asset to JPL flight projects. JPL flight projects have benefited significantly from MO&CA's efforts to contain risk and prevent rather than rework errors. MO&CA's ability to provide direct transfer of knowledge allows new projects to benefit directly from previous and ongoing experience. Since MO&CA, like Total Quality Management (TQM), focuses on continuous improvement of processes and elimination of rework, we recommend that this effort be continued on NASA flight projects.
Total Quality Management: Analysis, Evaluation and Implementation Within ACRV Project Teams
NASA Technical Reports Server (NTRS)
Raiman, Laura B.
1991-01-01
Total quality management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The Assured Crew Return Vehicle (ACRV) Project Office was identified as an excellent project in which to demonstrate the applications and benefits of TQM processes. As the ACRV Program moves through its various stages of development, it is vital that effectiveness and efficiency be maintained in order to provide the Space Station Freedom (SSF) crew an affordable, on-time assured return to Earth. A critical factor for the success of the ACRV is attaining the maximum benefit from the resources applied to the program. Through a series of four tutorials on various quality improvement techniques, and numerous one-on-one sessions during the SSF's 10-week term in the project office, results were obtained which are aiding the ACRV Office in implementing a disciplined, ongoing process for generating fundamental decisions and actions that shape and guide the organization. Significant advances were made in improving the processes for two particular groups - the correspondence distribution team and the WATER Test team. Numerous people from across JSC were a part of the various team activities including engineering, man systems, and safety. The work also included significant interaction with the support contractor to the ACRV Project. The results of the improvement activities can be used as models for other organizations desiring to operate under a system of continuous improvement. In particular, they have advanced the ACRV Project Teams further down the path of continuous improvement, in support of a working philosophy of TQM.
Improving image quality in laboratory x-ray phase-contrast imaging
NASA Astrophysics Data System (ADS)
De Marco, F.; Marschner, M.; Birnbacher, L.; Viermetz, M.; Noël, P.; Herzen, J.; Pfeiffer, F.
2017-03-01
Grating-based X-ray phase-contrast (gbPC) is known to provide significant benefits for biomedical imaging. To investigate these benefits, a high-sensitivity gbPC micro-CT setup for small (≍ 5 cm) biological samples has been constructed. Unfortunately, high differential-phase sensitivity leads to an increased magnitude of data processing artifacts, limiting the quality of tomographic reconstructions. Most importantly, processing of phase-stepping data with incorrect stepping positions can introduce artifacts resembling Moiré fringes to the projections. Additionally, the focal spot size of the X-ray source limits resolution of tomograms. Here we present a set of algorithms to minimize artifacts, increase resolution and improve visual impression of projections and tomograms from the examined setup. We assessed two algorithms for artifact reduction: Firstly, a correction algorithm exploiting correlations of the artifacts and differential-phase data was developed and tested. Artifacts were reliably removed without compromising image data. Secondly, we implemented a new algorithm for flatfield selection, which was shown to exclude flat-fields with strong artifacts. Both procedures successfully improved image quality of projections and tomograms. Deconvolution of all projections of a CT scan can minimize blurring introduced by the finite size of the X-ray source focal spot. Application of the Richardson-Lucy deconvolution algorithm to gbPC-CT projections resulted in an improved resolution of phase-contrast tomograms. Additionally, we found that nearest-neighbor interpolation of projections can improve the visual impression of very small features in phase-contrast tomograms. In conclusion, we achieved an increase in image resolution and quality for the investigated setup, which may lead to an improved detection of very small sample features, thereby maximizing the setup's utility.
Lessons learned from training peer-leaders to conduct Body Project workshops.
Vanderkruik, Rachel; Strife, Samantha; Dimidjian, Sona
2017-01-01
The Body Project is a cognitive-dissonance intervention that is effective in improving body satisfaction for high school and college aged women. The Body Project can be implemented by trained peers, thus increasing its potential for broad and cost-effective dissemination. Little is known, however, about peer-leaders' perceptions of their training needs and preferences to deliver prevention programs. This qualitative study explored the perceptions of training strengths and areas of improvement among 14 Body Project peer-leaders at a college campus through a series of focus groups. Recommendations are made to inform training for the Body Project as well as peer-led prevention and treatment interventions more broadly.
9-Ft By 7-Ft Supersonic Wind Tunnel Nozzle Improvement Study
NASA Technical Reports Server (NTRS)
Paciano, Eric N.
2014-01-01
Engineers at the Unitary Plan Wind Tunnel at NASA Ames Research Center have recently embarked on a project focused on improving flow quality and tunnel capabilities in the 9-ft by 7-ft supersonic wind tunnel. Collaborating with Jacobs Tech Group, the project has explored potential improvements to the nozzle design using computational fluid dynamics. Preliminary predictions suggest changes to the nozzle design could significantly improve flow quality at the lower operating range (M1.5-1.8), however potential improvements in the upper operating range have yet to be realized.
IMPROVING ACCESS TO INFORMATION ABOUT ORD PROJECTS
ORD project information is maintained in, and retrieved from, multiple systems and home pages. Not all sources of project information are Intranet accessible. Descriptive information may be abbreviated and not useful in conveying a comprehensive understanding of a project. The m...
Creating Quality Improvement Culture in Public Health Agencies
Mahanna, Elizabeth; Joly, Brenda; Zelek, Michael; Riley, William; Verma, Pooja; Fisher, Jessica Solomon
2014-01-01
Objectives. We conducted case studies of 10 agencies that participated in early quality improvement efforts. Methods. The agencies participated in a project conducted by the National Association of County and City Health Officials (2007–2008). Case study participants included health directors and quality improvement team leaders and members. We implemented multiple qualitative analysis processes, including cross-case analysis and logic modeling. We categorized agencies according to the extent to which they had developed a quality improvement culture. Results. Agencies were conducting informal quality improvement projects (n = 4), conducting formal quality improvement projects (n = 3), or creating a quality improvement culture (n = 4). Agencies conducting formal quality improvement and creating a quality improvement culture had leadership support for quality improvement, participated in national quality improvement initiatives, had a greater number of staff trained in quality improvement and quality improvement teams that met regularly with decision-making authority. Agencies conducting informal quality improvement were likely to report that accreditation is the major driver for quality improvement work. Agencies creating a quality improvement culture were more likely to have a history of evidence-based decision-making and use quality improvement to address emerging issues. Conclusions. Our findings support previous research and add the roles of national public health accreditation and emerging issues as factors in agencies’ ability to create and sustain a quality improvement culture. PMID:24228680
ERIC Educational Resources Information Center
Ahrens, Willis
As part of a social studies instruction improvement program, measurement instruments were developed to measure attitudes of and evaluate courses for teachers and students in grades 3-12. The measurement instruments presented are surveys used in the social studies program. The purposes of the improvement project are to use the multimedia approach…
ERIC Educational Resources Information Center
California Community Colleges, Sacramento. Office of the Chancellor.
One of a series of papers resulting from a Fund for the Improvement of Postsecondary Education (FIPSE) project to improve evaluation and planning in community colleges, this working paper presents the results of interviews with community college policymakers conducted to assess their views on matters such as non-governmental accreditation,…
An expert panel process to evaluate habitat restoration actions in the Columbia River estuary.
Krueger, Kirk L; Bottom, Daniel L; Hood, W Gregory; Johnson, Gary E; Jones, Kim K; Thom, Ronald M
2017-03-01
We describe a process for evaluating proposed ecosystem restoration projects intended to improve survival of juvenile salmon in the Columbia River estuary (CRE). Changes in the Columbia River basin (northwestern USA), including hydropower development, have contributed to the listing of 13 salmon stocks as endangered or threatened under the U.S. Endangered Species Act. Habitat restoration in the CRE, from Bonneville Dam to the ocean, is part of a basin-wide, legally mandated effort to mitigate federal hydropower impacts on salmon survival. An Expert Regional Technical Group (ERTG) was established in 2009 to improve and implement a process for assessing and assigning "survival benefit units" (SBUs) to restoration actions. The SBU concept assumes site-specific restoration projects will increase juvenile salmon survival during migration through the 234 km CRE. Assigned SBUs are used to inform selection of restoration projects and gauge mitigation progress. The ERTG standardized the SBU assessment process to improve its scientific integrity, repeatability, and transparency. In lieu of experimental data to quantify the survival benefits of individual restoration actions, the ERTG adopted a conceptual model composed of three assessment criteria-certainty of success, fish opportunity improvements, and habitat capacity improvements-to evaluate restoration projects. Based on these criteria, an algorithm assigned SBUs by integrating potential fish density as an indicator of salmon performance. Between 2009 and 2014, the ERTG assessed SBUs for 55 proposed projects involving a total of 181 restoration actions located across 8 of 9 reaches of the CRE, largely relying on information provided in a project template based on the conceptual model, presentations, discussions with project sponsors, and site visits. Most projects restored tidal inundation to emergent wetlands, improved riparian function, and removed invasive vegetation. The scientific relationship of geomorphic and salmonid responses to restoration actions remains the foremost concern. Although not designed to establish a broad strategy for estuary restoration, the scoring process has adaptively influenced the types, designs, and locations of restoration proposals. The ERTG process may be a useful model for others who have unique ecosystem restoration goals and share some of our common challenges. Copyright © 2016 Elsevier Ltd. All rights reserved.
NASA Astrophysics Data System (ADS)
Hayden-Lesmeister, A.; Remo, J. W.; Piazza, B.
2017-12-01
The Atchafalaya River (AR) in Louisiana is the principal distributary of the Mississippi River. Reach to system scale modifications on the AR and throughout its basin for regional flood mitigation, navigation, and hydrocarbon extraction have substantially altered the hydrologic connectivity between the river and its floodplain wetlands, threatening the ecological integrity of this globally-important ecosystem. Stakeholder groups agree that restoring flow connectivity is essential to maintaining the basin's water quality, and recent management efforts have focused on the 174 km2 Flat Lake Water Management Unit (WMU). Several flow-connectivity enhancement projects have been proposed by the Atchafalaya Basin Program's Technical Advisory Group, but none have been constructed. We collaborated with The Nature Conservancy and other agencies to obtain existing datasets and develop a 1D2D hydraulic model to examine whether proposed restoration projects improved lateral surface-water connectivity in the Flat Lake WMU. To do this, we employed a range of physical parameters (inundation extent, water depths, and rates of WSEL reduction) as potential indicators of improved connectivity with restoration. We ran simulations to examine two scenarios - a baseline scenario (S1) to examine current conditions (no restoration projects), and a full-implementation scenario (S2), where all restoration projects that could be examined at the model resolution were implemented. Potential indicators of improved lateral connectivity indicated that proposed projects may play an important role in improving water quality in the Flat Lake WMU. At the end of the constant-discharge portion of the run, average depths between S1 and S2 remained unchanged; however, depths and water levels were consistently lower for S2 during a drawdown. Volumetrically, up to 4.4 million m3 less water was in the Flat Lake system when projects were implemented. The results indicate that projects introduce nutrient-rich river water and improve flushing flows through backswamp areas. Our modeling approach may provide a cost-effective framework for examining the performance of proposed restoration projects along other highly-altered, low-gradient river systems.
Wai, Pyae Phyo; Shewade, Hemant Deepak; Kyaw, Nang Thu Thu; Thein, Saw; Si Thu, Aung; Kyaw, Khine Wut Yee; Aye, Nyein Nyein; Phyo, Aye Mon; Maung, Htet Myet Win; Soe, Kyaw Thu; Aung, Si Thu
2018-01-01
The Union in collaboration with national TB programme (NTP) started the community-based MDR-TB care (CBMDR-TBC) project in 33 townships of upper Myanmar to improve treatment initiation and treatment adherence. Patients with MDR-TB diagnosed/registered under NTP received support through the project staff, in addition to the routine domiciliary care provided by NTP staff. Each township had a project nurse exclusively for MDR-TB and 30 USD per month (max. for 4 months) were provided to the patient as a pre-treatment support. To assess whether CBMDR-TBC project's support improved treatment initiation. In this cohort study (involving record review) of all diagnosed MDR-TB between January 2015 and June 2016 in project townships, CBMDR-TBC status was categorized as "receiving support" if date of project initiation in patient's township was before the date of diagnosis and "not receiving support", if otherwise. Cox proportional hazards regression (censored on 31 Dec 2016) was done to identify predictors of treatment initiation. Of 456 patients, 57% initiated treatment: 64% and 56% among patients "receiving support (n = 208)" and "not receiving support (n = 228)" respectively (CBMDR-TBC status was not known in 20 (4%) patients due to missing diagnosis dates). Among those initiated on treatment (n = 261), median (IQR) time to initiate treatment was 38 (20, 76) days: 31 (18, 50) among patients "receiving support" and 50 (26,101) among patients "not receiving support". After adjusting other potential confounders (age, sex, region, HIV, past history of TB treatment), patients "receiving support" had 80% higher chance of initiating treatment [aHR (0.95 CI): 1.8 (1.3, 2.3)] when compared to patients "not receiving support". In addition, age 15-54 years, previous history of TB and being HIV negative were independent predictors of treatment initiation. Receiving support under CBMDR-TBC project improved treatment initiation: it not only improved the proportion initiated but also reduced time to treatment initiation. We also recommend improved tracking of all diagnosed patients as early as possible.
Flyer, presentation, and additional resources for the March 18, 2015 webcast, ELI/TNC Watershed Approach Handbook: Improving Outcomes and Increasing Benefits Associated with Wetland and Stream Restoration and Protection Projects
Methodologies for Improving Flight Project Information Capture, Storage, and Dissemination
NASA Technical Reports Server (NTRS)
Equils, Douglas J.
2011-01-01
This paper will discuss the drawbacks and risks of the current documentation paradigm, how Document QuickStart improves on that process and ultimately how this stream-lined approach will reduce risk and costs to the next generation of Flight Projects at JPL
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-15
... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Criteria for Developing Refuge Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The ``Criteria for Developing Refuge Water Management Plans'' (Refuge...
The agricultural model intercomparison and improvement project (AgMIP): Protocols and pilot studies
USDA-ARS?s Scientific Manuscript database
The Agricultural Model Intercomparison and Improvement Project (AgMIP) is a distributed climate-scenario simulation research activity for historical period model intercomparison and future climate change conditions with participation of multiple crop and agricultural economic model groups around the...
Taiwan: improving radiography through application of Six Sigma techniques.
Chen, Yan-Kwang; Lin, Jerry; Chang, Cheng-Chang
2005-01-01
The healthcare industry has shown significant recent growth potential in Taiwan. Associated financial problems have grown considerably since 1995, when national health insurance was implemented. Taiwan's healthcare bureau began to change the primary quantity-based healthcare expense payment method to a case-based payment model. Hospitals are now challenged to minimize healthcare waste. This article examines the application of manufacturing-based Six Sigma methods to an X-ray radiography improvement project to reduce the defect ratio of films for a teaching hospital in Taiwan. It was determined that (1) analysis of customer satisfaction data helped the Six Sigma improvement team identify critical quality elements; (2) the Six Sigma Level in this healthcare project is Lower than that in the manufacturing industry; (3) the improvement opportunity and the time required for the project had a direct correlation to the importance ascribed to the project and the cooperation received; and (4) process change can be made more quickly in the healthcare industry than in the manufacturing industry.
Researchers' Roles in Patient Safety Improvement.
Pietikäinen, Elina; Reiman, Teemu; Heikkilä, Jouko; Macchi, Luigi
2016-03-01
In this article, we explore how researchers can contribute to patient safety improvement. We aim to expand the instrumental role researchers have often occupied in relation to patient safety improvement. We reflect on our own improvement model and experiences as patient safety researchers in an ongoing Finnish multi-actor innovation project through self-reflective narration. Our own patient safety improvement model can be described as systemic. Based on the purpose of the innovation project, our improvement model, and the improvement models of the other actors in the project, we have carried out a wide range of activities. Our activities can be summarized in 8 overlapping patient safety improvement roles: modeler, influencer, supplier, producer, ideator, reflector, facilitator, and negotiator. When working side by side with "practice," researchers are offered and engage in several different activities. The way researchers contribute to patient safety improvement and balance between different roles depends on the purpose of the study, as well as on the underlying patient safety improvement models. Different patient safety research paradigms seem to emphasize different improvement roles, and thus, they also face different challenges. Open reflection on the underlying improvement models and roles can help researchers with different backgrounds-as well as other actors involved in patient safety improvement-in structuring their work and collaborating productively.
Development of a Multi-Domain Assessment Tool for Quality Improvement Projects.
Rosenbluth, Glenn; Burman, Natalie J; Ranji, Sumant R; Boscardin, Christy K
2017-08-01
Improving the quality of health care and education has become a mandate at all levels within the medical profession. While several published quality improvement (QI) assessment tools exist, all have limitations in addressing the range of QI projects undertaken by learners in undergraduate medical education, graduate medical education, and continuing medical education. We developed and validated a tool to assess QI projects with learner engagement across the educational continuum. After reviewing existing tools, we interviewed local faculty who taught QI to understand how learners were engaged and what these faculty wanted in an ideal assessment tool. We then developed a list of competencies associated with QI, established items linked to these competencies, revised the items using an iterative process, and collected validity evidence for the tool. The resulting Multi-Domain Assessment of Quality Improvement Projects (MAQIP) rating tool contains 9 items, with criteria that may be completely fulfilled, partially fulfilled, or not fulfilled. Interrater reliability was 0.77. Untrained local faculty were able to use the tool with minimal guidance. The MAQIP is a 9-item, user-friendly tool that can be used to assess QI projects at various stages and to provide formative and summative feedback to learners at all levels.
Hetherington, Erin; Eggers, Matthijs; Wamoyi, Joyce; Hatfield, Jennifer; Manyama, Mange; Kutz, Susan; Bastien, Sheri
2017-02-07
Diarrheal disease is a major cause of mortality and morbidity in low and middle income countries with children being disproportionately affected. Project SHINE (Sanitation & Hygiene INnovation in Education) is a grassroots participatory science education and social entrepreneurship model to engage youth and the wider community in the development of sustainable strategies to improve sanitation and hygiene. Based in rural and remote Tanzania, this pilot study engaged pastoralist high-school students and communities in the development and evaluation of culturally and contextually relevant strategies to improve sanitation and hygiene. Using a train-the-trainer approach, key activities included teacher workshops, school-based lessons, extra-curricular activities, community events and a One Health sanitation science fair which showcased projects related to water, sanitation and hygiene in relation to human and animal health. The process and outcome of the study were evaluated through qualitative interviews and focus group discussions with diverse project participants, as well as pre- and post- questionnaires completed by students on knowledge, attitudes and practices concerning sanitation and hygiene. The questionnaire results at baseline and follow-up showed statistically significant improvements on key measures including a decrease in unhygienic behaviors, an increase in the perceived importance of handwashing and intention to use the toilet, and increased communication in the social network about the importance of clean water and improved sanitation and hygiene practices, however there were no significant changes in sanitation related knowledge. Qualitative data highlighted strong leadership emerging from youth and enthusiasm from teachers and students concerning the overall approach in the project, including the use of participatory methods. There was a high degree of community engagement with hundreds of community members participating in school-based events. Sanitation science fair projects addressed a range of pastoralist questions and concerns regarding the relationship between water, sanitation and hygiene. Several projects, such as making soap from local materials, demonstrate potential as a sustainable strategy to improve health and livelihoods in the long-term. The Project SHINE model shows promise as an innovative capacity building approach and as an engagement and empowerment strategy for youth and communities to develop locally sustainable strategies to improve sanitation and hygiene.
Shimoda, Gilcéria Tochika; Soares, Alda Valeria Neves; Aragaki, Ilva Marico Mizumoto; McArthur, Alexa
2015-03-12
Nipple trauma in lactating women is an important issue in facilitating successful breastfeeding. Evidence suggests that early postnatal education on the positioning and attachment technique, early observation of mothers and correcting breastfeeding techniques at an early stage may reduce nipple trauma. The aim of this project was to improve breastfeeding practice and thereby reduce nipple trauma in lactating women in a public hospital in Sao Paulo. More specifically the objectives of this project were: firstly, to assess the current practice in nurses' assistance concerning the prevention of nipple trauma; secondly, to adapt and trial a Breastfeeding Assessment Form to observe and educate the lactating mother during the early post-natal period; and thirdly, to assess the impact of introducing the assessment strategy on breastfeeding and nipple trauma rates. The Joanna Briggs Institute Practical Application of Clinical Evidence System online tool was utilized for this project. A clinical audit was conducted to assess compliance with best practice in nursing assistance concerning the prevention of nipple trauma. The project concluded with a second audit, which assessed the change in practice following the implementation of strategies to improve practice. The project was successful in that there was an improvement across all of the audit criteria following the introduction of the strategy to promote best practice. Criterion 1, concerning nursing staff knowledge, improved in compliance by 73%. Criterion 2 and 4, concerning women's knowledge about prevention and management of nipple trauma, improved by 53% and 55% respectively. Breastfeeding assessment improved by 26% from baseline to follow-up audit. Moreover, an improvement in women's satisfaction and exclusive breastfeeding rates was observed; however, nipple trauma rates did not decrease. This implementation project had great impact on both nursing staff as well as lactating women's knowledge of preventing and managing nipple trauma. It also enhanced women's satisfaction with breastfeeding and exclusive breastfeeding rates. Further research is required into other aspects involved with the onset of nipple trauma. The Joanna Briggs Institute.
Information Technology Project Processes: Understanding the Barriers to Improvement and Adoption
ERIC Educational Resources Information Center
Williams, Bernard L.
2009-01-01
Every year, organizations lose millions of dollars due to IT (Information Technology) project failures. Over time, organizations have developed processes and procedures to help reduce the incidence of challenged IT projects. Research has shown that IT project processes can work to help reduce the number of challenged projects. The research in this…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-02
...; Arizona; Bradshaw Vegetation Management Project AGENCY: Forest Service, USDA. ACTION: Notice of intent to prepare an environmental impact statement. SUMMARY: This project is a proposal to improve the health of.... The project area encompasses about 55,554 acres. Within the project area, the proposal is to...
Resources for Change: A Guide to Projects, 1978-79.
ERIC Educational Resources Information Center
Fund for the Improvement of Postsecondary Education (DHEW), Washington, DC.
Descriptions are provided of the 175 projects supported by the Fund for the Improvement of Postsecondary Education in 1978-79. The projects address the broad range of educational needs represented in the proposals submitted to the Fund's Comprehensive Program. About half the projects are newly funded, and half are renewals. Project descriptions…
Benchmarking facilities providing care: An international overview of initiatives
Thonon, Frédérique; Watson, Jonathan; Saghatchian, Mahasti
2015-01-01
We performed a literature review of existing benchmarking projects of health facilities to explore (1) the rationales for those projects, (2) the motivation for health facilities to participate, (3) the indicators used and (4) the success and threat factors linked to those projects. We studied both peer-reviewed and grey literature. We examined 23 benchmarking projects of different medical specialities. The majority of projects used a mix of structure, process and outcome indicators. For some projects, participants had a direct or indirect financial incentive to participate (such as reimbursement by Medicaid/Medicare or litigation costs related to quality of care). A positive impact was reported for most projects, mainly in terms of improvement of practice and adoption of guidelines and, to a lesser extent, improvement in communication. Only 1 project reported positive impact in terms of clinical outcomes. Success factors and threats are linked to both the benchmarking process (such as organisation of meetings, link with existing projects) and indicators used (such as adjustment for diagnostic-related groups). The results of this review will help coordinators of a benchmarking project to set it up successfully. PMID:26770800
NASA Astrophysics Data System (ADS)
Balve, Patrick; Krüger, Volker; Tolstrup Sørensen, Lene
2017-11-01
Problem-based learning (PBL) has proven to be highly effective for educating students in an active and self-motivated manner in various disciplines. Student projects carried out following PBL principles are very dynamic and carry a high level of uncertainty, both conditions under which agile project management approaches are assumed to be highly supportive. The paper describes an empirical case study carried out at Aalborg University Copenhagen involving students from two different semesters of a Bachelor of Science programme. While executing the study, compelling examples of how PBL and the agile project management method Kanban blend could be identified. A final survey reveals that applying Kanban produces noticeable improvements with respect to creating, assigning and coordinating project tasks. Other improvements were found in group communication, knowledge about the work progress with regards to both the individual and the collective and the students' way of continuously improving their own teamwork.
Holve, Erin
2013-01-01
Multi-institutional research and quality improvement (QI) projects using electronic clinical data (ECD) hold great promise for improving quality of care and patient outcomes but typically require significant infrastructure investments both to initiate and maintain the project over its duration. Consequently, it is important for these projects to think holistically about sustainability to ensure their long-term success. Four "pillars" of sustainability are discussed based on the experiences of EDM Forum grantees and other research and QI networks. These include trust and value, governance, management, and financial and administrative support. Two "foundational considerations," adaptive capacity and policy levers, are also discussed.
NASA Astrophysics Data System (ADS)
Restano, Marco; Ambrózio, Américo; Cotton, David; Scoop Team; Fabry, Pierre; Shape Team; McMillan, Malcolm; Spice Team; Benveniste, Jérôme
2017-04-01
Under the ESA Scientific Exploitation of Operational Missions (SEOM) Programme, 3 Projects are currently underway to accurately characterise and improve the performance of the Sentinel-3 SRAL SAR mode altimeter. They are: 1) SCOOP (SAR Altimetry Coastal & Open Ocean Performance Exploitation and Roadmap Study) for Coastal and Open Ocean; 2) SHAPE (Sentinel-3 Hydrologic Altimetry PrototypE) for Inland Water; 3) SPICE (Sentinel-3 Performance improvement for ICE sheets) for Ice Sheets. As projects started before the launch of Sentinel-3 (a full SAR mission), calibrated Cryosat-2 data have been used as input to a processor replicating the Sentinel-3 baseline processing. For the SCOOP project, a first test dataset has been released to end users including data from 10 regions of interest. The successful SAMOSA retracker, adopted in the previous CP4O Project (CryoSat Plus for Oceans), has been readapted to re-track Sentinel-3 waveforms. An improved version of SAMOSA will be released at the end of the project. The SHAPE project is working towards the design and assessment of alternative/innovative techniques not implemented in the Sentinel-3 ground segment (performing no Inland Water dedicated processing). Both rivers and lakes will be studied. Amazon, Brahmaputra and Danube have been selected as rivers, whereas Titicaca and Vanern have been chosen as lakes. The study will include the assimilation of output products into hydrological models for all regions of interest. A final dataset will be provided to end users. The SPICE project is addressing four high level objectives: 1) Assess and improve the Delay-Doppler altimeter processing for ice sheets. 2) Assess and develop SAR waveform retrackers for ice sheets. 3) Evaluate the performance of SAR altimetry relative to conventional pulse limited altimetry. 4) Assess the impact on SAR altimeter measurements of radar wave interaction with the snowpack. Dataset used for validation include ICESat and IceBridge products. Vostok, Dome C and the Spirit Sector (all located in Antarctica) have been selected, along with the Russell Glacier in Greenland, as regions of interest. In the frame of both SCOOP and SHAPE projects, improved wet troposphere corrections will be estimated for all regions of interest.
Improving Climate Projections Using "Intelligent" Ensembles
NASA Technical Reports Server (NTRS)
Baker, Noel C.; Taylor, Patrick C.
2015-01-01
Recent changes in the climate system have led to growing concern, especially in communities which are highly vulnerable to resource shortages and weather extremes. There is an urgent need for better climate information to develop solutions and strategies for adapting to a changing climate. Climate models provide excellent tools for studying the current state of climate and making future projections. However, these models are subject to biases created by structural uncertainties. Performance metrics-or the systematic determination of model biases-succinctly quantify aspects of climate model behavior. Efforts to standardize climate model experiments and collect simulation data-such as the Coupled Model Intercomparison Project (CMIP)-provide the means to directly compare and assess model performance. Performance metrics have been used to show that some models reproduce present-day climate better than others. Simulation data from multiple models are often used to add value to projections by creating a consensus projection from the model ensemble, in which each model is given an equal weight. It has been shown that the ensemble mean generally outperforms any single model. It is possible to use unequal weights to produce ensemble means, in which models are weighted based on performance (called "intelligent" ensembles). Can performance metrics be used to improve climate projections? Previous work introduced a framework for comparing the utility of model performance metrics, showing that the best metrics are related to the variance of top-of-atmosphere outgoing longwave radiation. These metrics improve present-day climate simulations of Earth's energy budget using the "intelligent" ensemble method. The current project identifies several approaches for testing whether performance metrics can be applied to future simulations to create "intelligent" ensemble-mean climate projections. It is shown that certain performance metrics test key climate processes in the models, and that these metrics can be used to evaluate model quality in both current and future climate states. This information will be used to produce new consensus projections and provide communities with improved climate projections for urgent decision-making.
The Use of Operational Excellence Principles in a University Hospital.
Edelman, Eric R; Hamaekers, Ankie E W; Buhre, Wolfgang F; van Merode, Godefridus G
2017-01-01
The introduction of Operational Excellence in the Maastricht University Medical Center (MUMC+) has been the first of its kind and scale for a university hospital. The policy makers of the MUMC+ have combined different elements from various other business, management, and healthcare philosophies and frameworks into a unique mix. This paper summarizes the journey of developing this system and its most important aspects. Special attention is paid to the role of the operating rooms and the improvements that have taken place there, because of their central role in the working of the hospital. The MUMC+ is the leading tertiary healthcare center for the South-East region of The Netherlands and beyond. Regional, national, and international developments encouraged the MUMC+ to start significantly reorganizing its care processes from 2009 onward. First experiments with Lean Six Sigma and Business Modeling were combined with lessons learned from other centers around the world to form the MUMC+'s own type of Operational Excellence. At the time of writing, many improvement projects of different types have been successfully completed. Every single department in the hospital now uses Operational Excellence and design thinking in general as a method to develop new models of care. An evaluation in 2014 revealed several opportunities for improvement. A large number of projects were in progress, but 75% of all projects had not been completed, despite the first projects being initiated back in 2012. This led to a number of policy changes, mainly focusing on more intensive monitoring of projects and trying to do more improvement projects directly under the responsibility of the line manager. Focusing on patient value, continuous improvement, and the reduction of waste have proven to be very fitting principles for healthcare in general and specifically for application in a university hospital. Approaching improvement at a systems level while directly involving the people on the work floor in observing opportunities for improvement and realizing these has shown itself to be essential.
Wilper, Andrew P.; Smith, Curtis Scott; Weppner, William
2013-01-01
Background The Accreditation Council for Graduate Medical Education (ACGME) requires that training programs integrate system-based practice (SBP) and practice-based learning and improvement (PBLI) into internal medicine residency curricula. Context and setting We instituted a seminar series and year-long-mentored curriculum designed to engage internal medicine residents in these competencies. Methods Residents participate in a seminar series that includes assigned reading and structured discussion with faculty who assist in the development of quality improvement or research projects. Residents pursue projects over the remainder of the year. Monthly works in progress meetings, protected time for inquiry, and continued faculty mentorship guide the residents in their project development. Trainees present their work at hospital-wide grand rounds at the end of the academic year. We performed a survey of residents to assess their self-reported knowledge, attitudes and skills in SBP and PBLI. In addition, blinded faculty scored projects for appropriateness, impact, and feasibility. Outcomes We measured resident self-reported knowledge, attitudes, and skills at the end of the academic year. We found evidence that participants improved their understanding of the context in which they were practicing, and that their ability to engage in quality improvement projects increased. Blinded faculty reviewers favorably ranked the projects’ feasibility, impact, and appropriateness. The ‘Curriculum of Inquiry’ generated 11 quality improvement and research projects during the study period. Barriers to the ongoing work include a limited supply of mentors and delays due to Institutional Review Board approval. Hospital leadership recognizes the importance of the curriculum, and our accreditation manager now cites our ongoing work. Conclusions A structured residency-based curriculum facilitates resident demonstration of SBP and practice-based learning and improvement. Residents gain knowledge and skills though this enterprise and hospitals gain access to trainees who help to solve ongoing problems and meet accreditation requirements. PMID:24044686
The Use of Operational Excellence Principles in a University Hospital
Edelman, Eric R.; Hamaekers, Ankie E. W.; Buhre, Wolfgang F.; van Merode, Godefridus G.
2017-01-01
The introduction of Operational Excellence in the Maastricht University Medical Center (MUMC+) has been the first of its kind and scale for a university hospital. The policy makers of the MUMC+ have combined different elements from various other business, management, and healthcare philosophies and frameworks into a unique mix. This paper summarizes the journey of developing this system and its most important aspects. Special attention is paid to the role of the operating rooms and the improvements that have taken place there, because of their central role in the working of the hospital. The MUMC+ is the leading tertiary healthcare center for the South-East region of The Netherlands and beyond. Regional, national, and international developments encouraged the MUMC+ to start significantly reorganizing its care processes from 2009 onward. First experiments with Lean Six Sigma and Business Modeling were combined with lessons learned from other centers around the world to form the MUMC+’s own type of Operational Excellence. At the time of writing, many improvement projects of different types have been successfully completed. Every single department in the hospital now uses Operational Excellence and design thinking in general as a method to develop new models of care. An evaluation in 2014 revealed several opportunities for improvement. A large number of projects were in progress, but 75% of all projects had not been completed, despite the first projects being initiated back in 2012. This led to a number of policy changes, mainly focusing on more intensive monitoring of projects and trying to do more improvement projects directly under the responsibility of the line manager. Focusing on patient value, continuous improvement, and the reduction of waste have proven to be very fitting principles for healthcare in general and specifically for application in a university hospital. Approaching improvement at a systems level while directly involving the people on the work floor in observing opportunities for improvement and realizing these has shown itself to be essential. PMID:28752089
Prince, Lisa K.; Little, Dustin J.; Schexneider, Katherine I.
2017-01-01
The Accreditation Council for Graduate Medical Education requires that trainees show progressive milestone attainment in the practice–based learning and systems–based practice competencies. As part of the Clinical Learning Environment Review, sponsoring hospitals must educate trainees in health care quality improvement, provide them with specialty–specific quality data, and ensure trainee participation in quality improvement activities and committees. Subspecialty–specific quality improvement curricula in nephrology training programs have not been reported, although considerable curricular and assessment material exists for specialty residencies, including tools for assessing trainee and faculty competence. Nephrology–specific didactic material exists to assist nephrology fellows and faculty mentors in designing and implementing quality improvement projects. Nephrology is notable among internal medicine subspecialties for the emphasis placed on adherence to quality thresholds—specifically for chronic RRT shown by the Centers for Medicare and Medicaid Services Quality Incentive Program. We have developed a nephrology-specific curriculum that meets Accreditation Council for Graduate Medical Education and Clinical Learning Environment Review requirements, acknowledges regulatory quality improvement requirements, integrates with ongoing divisional quality improvement activities, and has improved clinical care and the training program. In addition to didactic training in quality improvement, we track trainee compliance with Kidney Disease Improving Global Outcomes CKD and ESRD quality indicators (emphasizing Quality Improvement Program indicators), and fellows collaborate on a yearly multidisciplinary quality improvement project. Over the past 6 years, each fellowship class has, on the basis of a successful quality improvement project, shown milestone achievement in Systems-Based Practice and Practice-Based Learning. Fellow quality improvement projects have improved nephrology clinical care within the institution and introduced new educational and assessment tools to the training program. All have been opportunities for quality improvement scholarship. The curriculum prepares fellows to apply quality improvement principals in independent clinical practice—while showing milestone advancement and divisional compliance with Clinical Learning Environment Review requirements. PMID:28174318
Yuasa, Motoyuki; Yamaguchi, Yoshie; Imada, Mihoko
2013-09-22
The Japan International Cooperation Agency (JICA) has focused its attention on appraising health development assistance projects and redirecting efforts towards health system strengthening. This study aimed to describe the type of project and targets of interest, and assess the contribution of JICA health-related projects to strengthening health systems worldwide. We collected a web-based Project Design Matrix (PDM) of 105 JICA projects implemented between January 2005 and December 2009. We developed an analytical matrix based on the World Health Organization (WHO) health system framework to examine the PDM data and thereby assess the projects' contributions to health system strengthening. The majority of JICA projects had prioritized workforce development, and improvements in governance and service delivery. Conversely, there was little assistance for finance or medical product development. The vast majority (87.6%) of JICA projects addressed public health issues, for example programs to improve maternal and child health, and the prevention and treatment of infectious diseases such as AIDS, tuberculosis and malaria. Nearly 90% of JICA technical healthcare assistance directly focused on improving governance as the most critical means of accomplishing its goals. Our study confirmed that JICA projects met the goals of bilateral cooperation by developing workforce capacity and governance. Nevertheless, our findings suggest that JICA assistance could be used to support financial aspects of healthcare systems, which is an area of increasing concern. We also showed that the analytical matrix methodology is an effective means of examining the component of health system strengthening to which the activity and output of a project contributes. This may help policy makers and practitioners focus future projects on priority areas.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-29
... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Westlands Water District Drainage Repayment Contract AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of Proposed Repayment Contract. SUMMARY: The Bureau of Reclamation will be initiating negotiations with the...
Program Improvement Project for Industrial Education. Annual Report.
ERIC Educational Resources Information Center
Shaeffer, Bruce W.
Designed to improve industrial education programs through the development of minimum uniform quality standards, a project developed a task list, educationally sequenced the identified tasks, and developed a recommended shop layout and equipment list for four occupational areas: diesel repair, appliance repair, office machine repair, and small…
Project Ranger Curriculum Guide.
ERIC Educational Resources Information Center
Fox, Carla; And Others
The objective of Project Ranger is to improve school behavior and academic performance of selected, primarily "disruptive," students who are failing in the traditional school program. The Ranger curriculum uses the outdoor environment as the medium for improving student self-concept and relations with peers and adults and for providing…
Report #11-R-0214, May 2, 2011. We conducted an unannounced visit of the construction site of the Perkins Public Works Authority’s wastewater treatment facility improvements project in Perkins, Oklahoma, on April 19–22, 2010.
SOCIO-ECONOMIC IMPACT EVALUATION OF LAKE IMPROVEMENT PROJECTS AND LAKE MANAGEMENT GUIDELINES
Under Public Law 92-500, the U.S. Environmental Protection Agency embarked on a major program of cost sharing grants to implement lake rehabilitation and protection projects. Improvement of water quality impacts the lives of people and organizations; however, the methods used to ...
National Quality Improvement Center on Early Childhood
ERIC Educational Resources Information Center
Browne, Charlyn Harper
2014-01-01
The national Quality Improvement Center on early Childhood (QIC-eC) funded four research and demonstration projects that tested child maltreatment prevention approaches. The projects were guided by several key perspectives: the importance of increasing protective factors in addition to decreasing risk factors in child maltreatment prevention…
DOT National Transportation Integrated Search
2014-09-01
The West Virginia Division of Highways (WV DOH) hosted a Peer Exchange to share information and experiences for streamlining Highway Safety Improvement Program (HSIP) project delivery. The event was held September 23 to 24, 2014 in Charleston, West V...
The United States Environmental Protection Agency's (EPA) National Exposure Research Laboratory (NERL) has initiated a project to improve the methodology for modeling human exposure to motor vehicle emission. The overall project goal is to develop improved methods for modeling...
The Improvement of Higher Education in Indonesia: A Project Approach.
ERIC Educational Resources Information Center
Ruitjer, Kees; Utomo, Tjipto
1983-01-01
An international project for improvement of an Indonesian university's chemical engineering curriculum and later extended to other institutions and departments, included these changes: greater emphasis on discussion and problem-solving techniques, use of learning modules, introduction of criterion-referenced grading, and extended and improved…
Collaborative Educational Ethnography: Problems and Profits.
ERIC Educational Resources Information Center
Gibson, Margaret A.
1985-01-01
The Punjabi Education Project was a collaborative research effort involving a Sikh community in California, a school district, a community organization, and an educational anthropologist. The project aimed to improve relations between the ethnic and mainstream groups at a local high school and simultaneously to improve educational performance…
Leadership, Medication Administration, and Knowledge Retention: A Quality Improvement Project
ERIC Educational Resources Information Center
Treister, Pamela
2017-01-01
A leadership and quality improvement project was undertaken in order to assist undergraduate baccalaureate nursing students in knowledge retention for medication administration during their senior semester in nursing school. Specific changes in curriculum were implemented to assist these undergraduate baccalaureate nursing students at a suburban…
Brooks, Joanna Veazey; Gorbenko, Ksenia; Bosk, Charles
Implementing quality improvement in hospitals requires a multifaceted commitment from leaders, including financial, material, and personnel resources. However, little is known about the interactional resources needed for project implementation. The aim of this analysis was to identify the types of interactional support hospital teams sought in a surgical quality improvement project. Hospital site visits were conducted using a combination of observations, interviews, and focus groups to explore the implementation of a surgical quality improvement project. Twenty-six site visits were conducted between October 2012 and August 2014 at a total of 16 hospitals that agreed to participate. All interviews were recorded, transcribed, and coded for themes using inductive analysis. We interviewed 321 respondents and conducted an additional 28 focus groups. Respondents reported needing the following types of interactional support during implementation of quality improvement interventions: (1) a critical outside perspective on their implementation progress; (2) opportunities to learn from peers, especially around clinical innovations; and (3) external validation to help establish visibility for and commitment to the project. Quality improvement in hospitals is both a clinical endeavor and a social endeavor. Our findings show that teams often desire interactional resources as they implement quality improvement initiatives. In-person site visits can provide these resources while also activating emotional energy for teams, which builds momentum and sustainability for quality improvement work. Policymakers and quality improvement leaders will benefit from developing strategies to maximize interactional learning and feedback for quality improvement teams. Further research should investigate the most effective methods for meeting these needs.
Brooks, Joanna Veazey; Gorbenko, Ksenia; Bosk, Charles
2017-01-01
BACKGROUND Implementing quality improvement in hospitals requires a multi-faceted commitment from leaders, including financial, material, and personnel resources. However, little is known about the interactional resources needed for project implementation. The aim of this analysis was to identify the types of interactional support hospital teams sought in a surgical quality improvement project. METHODS Hospital site visits were conducted using a combination of observations, interviews, and focus groups to explore the implementation of a surgical quality improvement project. Twenty-six site visits were conducted between October 2012 and August 2014 at a total of 16 hospitals that agreed to participate. All interviews were recorded, transcribed, and coded for themes using inductive analysis. RESULTS We interviewed 321 respondents and conducted an additional 28 focus groups. Respondents reported needing the following types of interactional support during implementation of quality improvement interventions: 1) a critical outside perspective on their implementation progress; 2) opportunities to learn from peers, especially around clinical innovations; and 3) external validation to help establish visibility for and commitment to the project. CONCLUSIONS Quality improvement in hospitals is both a clinical and a social endeavor. Our findings show that teams often desire interactional resources as they implement quality improvement initiatives. In-person site visits can provide these resources while also activating emotional energy for teams, which builds momentum and sustainability for quality improvement work. IMPLICATIONS Policymakers and quality improvement leaders will benefit from developing strategies to maximize interactional learning and feedback for quality improvement teams. Further research should investigate the most effective methods for meeting these needs. PMID:28375951
Gomez-Castillo, Blanca J; Hirsch, Rosemarie; Groninger, Hunter; Baker, Karen; Cheng, M Jennifer; Phillips, Jayne; Pollack, John; Berger, Ann M
2015-11-01
Spirituality is a patient need that requires special attention from the Pain and Palliative Care Service team. This quality improvement project aimed to provide spiritual assessment for all new outpatients with serious life-altering illnesses. Percentage of new outpatients receiving spiritual assessment (Faith, Importance/Influence, Community, Address/Action in care, psychosocial evaluation, chaplain consults) at baseline and postinterventions. Interventions included encouraging clinicians to incorporate adequate spiritual assessment into patient care and implementing chaplain covisits for all initial outpatient visits. The quality improvement interventions increased spiritual assessment (baseline vs. postinterventions): chaplain covisits (25.5% vs. 50%), Faith, Importance/Influence, Community, Address/Action in care completion (49% vs. 72%), and psychosocial evaluation (89% vs. 94%). Improved spiritual assessment in an outpatient palliative care clinic setting can occur with a multidisciplinary approach. This project also identifies data collection and documentation processes that can be targeted for improvement. Published by Elsevier Inc.
Fracol, Megan; Grim, Michelle; Lanier, Steven T; Fine, Neil A
2018-03-01
The latissimus dorsi myocutaneous flap is a reliable and frequently used option to bring vascularized skin and soft tissue to improve the stability and aesthetic result in breast reconstruction. Standard techniques with skin paddle inset in a horizontal or oblique fashion preferentially improve anterior projection (when inset at the mastectomy scar) or lower pole and inframammary fold constriction (when inset into the inframammary fold). Here, the authors describe a modification for inset of the latissimus dorsi myocutaneous flap that improves both anterior projection and lower pole/inframammary fold constriction, and also allows the latissimus muscle to fan out and provide complete implant coverage. The vertical inset modification brings new skin and soft tissue into both the inferior pole and the central mastectomy scar, allowing simultaneous improvement in both areas and full use of the latissimus muscle to cover the implant or expander. Therapeutic, IV.
Teaching Reform of Civil Engineering Materials Course Based on Project-Driven Pedagogy
NASA Astrophysics Data System (ADS)
Yidong, Xu; Wei, Chen; WeiguoJian, You; Jiansheng, Shen
2018-05-01
In view of the scattered experimental projects in practical courses of civil engineering materials, the poor practical ability of students and the disconnection between practical teaching and theoretical teaching, this paper proposes a practical teaching procedure. Firstly, the single experiment should be offered which emphasizes on improving the students’ basic experimental operating ability. Secondly, the compressive experiment is offered and the overall quality of students can be examined in the form of project team. In order to investigate the effect of teaching reform, the comparative analysis of the students of three grades (2014, 2015 and 2016) majored in civil engineering was conducted. The result shows that the students’ ability of experimental operation is obviously improved by using the project driven method-based teaching reform. Besides, the students’ ability to analyse and solve problems has also been improved.
2011-05-16
Project Sponsor: CAPT Chris Ray Black/Green Belt: CDR Mike Ryan Business Impact ($) KAIZEN / Rapid Improvement Event The expected impacts of this...Availability Contracts Project Methodology: DMAIC DFSS Kaizen Project Plan—list planned dates for each DMAIC phase Kaizen start and end dates...Initial Plan of Action for Kaizen Week 1) List and quantify elements that make the Big X metrics; 2) Capture the current competition categories into which
A fourth-year medical school rotation in quality, patient safety, and population medicine.
Dysinger, Wayne S; Pappas, James M
2011-10-01
Quality improvement and population medicine are skills that are increasingly important for physicians to possess. Methods to achieve foundational acquisition of these skills in medical school have not been well described in the past. The primary goal of this project is to provide hands-on, experiential learning in full-cycle population-based care. A description is given of a 4-week, team-based, rapid-cycle quality improvement project embedded in a required fourth-year medical school rotation. Over the course of 4 years a nonspecialty generic Ambulatory Care rotation was converted to a population-based learning rotation. For the last 3 years this rotation has required students to participate in teams of three to four students to assess, plan, implement, and evaluate a quality improvement project. Between 2008 and 2010 a total of 510 students completed the rotation. During this time the project component of the rotation received a 53% average rating of "excellent" or "above average." Qualitative evaluation indicates the project to be an acceptable and worthwhile educational experience for medical students, adding new insights and occasionally career-changing perspectives. Although experiential team-based quality improvement projects are a new format for learning in the medical school environment, it can be implemented in a format that is acceptable and beneficial to future physicians and healthcare systems. Copyright © 2011 American Journal of Preventive Medicine. Published by Elsevier Inc. All rights reserved.
Projecting technology change to improve space technology planning and systems management
NASA Astrophysics Data System (ADS)
Walk, Steven Robert
2011-04-01
Projecting technology performance evolution has been improving over the years. Reliable quantitative forecasting methods have been developed that project the growth, diffusion, and performance of technology in time, including projecting technology substitutions, saturation levels, and performance improvements. These forecasts can be applied at the early stages of space technology planning to better predict available future technology performance, assure the successful selection of technology, and improve technology systems management strategy. Often what is published as a technology forecast is simply scenario planning, usually made by extrapolating current trends into the future, with perhaps some subjective insight added. Typically, the accuracy of such predictions falls rapidly with distance in time. Quantitative technology forecasting (QTF), on the other hand, includes the study of historic data to identify one of or a combination of several recognized universal technology diffusion or substitution patterns. In the same manner that quantitative models of physical phenomena provide excellent predictions of system behavior, so do QTF models provide reliable technological performance trajectories. In practice, a quantitative technology forecast is completed to ascertain with confidence when the projected performance of a technology or system of technologies will occur. Such projections provide reliable time-referenced information when considering cost and performance trade-offs in maintaining, replacing, or migrating a technology, component, or system. This paper introduces various quantitative technology forecasting techniques and illustrates their practical application in space technology and technology systems management.
76 FR 20071 - Environmental Impact Statement: Oakland and Genesee Counties, MI
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-11
... pavement rehabilitation projects, safety improvement projects, intersection operation projects, and... when the narrow boulevard was found to be equal from a traffic standpoint and acceptable from a design...
Accuracy Improvement of Neutron Nuclear Data on Minor Actinides
NASA Astrophysics Data System (ADS)
Harada, Hideo; Iwamoto, Osamu; Iwamoto, Nobuyuki; Kimura, Atsushi; Terada, Kazushi; Nakao, Taro; Nakamura, Shoji; Mizuyama, Kazuhito; Igashira, Masayuki; Katabuchi, Tatsuya; Sano, Tadafumi; Takahashi, Yoshiyuki; Takamiya, Koichi; Pyeon, Cheol Ho; Fukutani, Satoshi; Fujii, Toshiyuki; Hori, Jun-ichi; Yagi, Takahiro; Yashima, Hiroshi
2015-05-01
Improvement of accuracy of neutron nuclear data for minor actinides (MAs) and long-lived fission products (LLFPs) is required for developing innovative nuclear system transmuting these nuclei. In order to meet the requirement, the project entitled as "Research and development for Accuracy Improvement of neutron nuclear data on Minor ACtinides (AIMAC)" has been started as one of the "Innovative Nuclear Research and Development Program" in Japan at October 2013. The AIMAC project team is composed of researchers in four different fields: differential nuclear data measurement, integral nuclear data measurement, nuclear chemistry, and nuclear data evaluation. By integrating all of the forefront knowledge and techniques in these fields, the team aims at improving the accuracy of the data. The background and research plan of the AIMAC project are presented.
Project LIFE, 1963-1975. Final Report.
ERIC Educational Resources Information Center
Pfau, Glenn S.
Presented is the final report on Project Life (Language Improvement to Facilitate Education), a 12-year (1963-75) project which developed filmstrips and supplementary materials for teaching language to deaf children. General overview and historical review sections include information on project goals and objectives, administration agencies and…
76 FR 12080 - TRICARE Access to Care Demonstration Project
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-04
... DEPARTMENT OF DEFENSE Office of the Secretary TRICARE Access to Care Demonstration Project AGENCY..., Section 1092, entitled Department of Defense TRICARE Access to Care Demonstration Project. The demonstration project is intended to improve access to urgent care including minor illness or injury for Coast...
Bhalla, Rohit; Jalon, Hillary S; Ryan, Lorraine
The Institute of Medicine has noted that a key factor underlying patient safety problems in the United States is a paucity of quality and safety training programs for clinicians. The Greater New York Hospital Association and United Hospital Fund created the Clinical Quality Fellowship Program (CQFP) to develop quality improvement leaders in the New York region. The goals of this article are to describe the CQFP's structure and curriculum, program participants' perceived value, improvement projects, and career paths. Eighty-seven participants completed the CQFP from 2010 to 2014. Among program participants completing self-assessment evaluations, significant improvements were observed across all quality improvement skill areas. Capstone project categories included inpatient efficiency, transitional care, and hospital infection. Fifty-six percent of participants obtained promotions following program completion. A training program emphasizing diverse curricular elements, varied learning approaches, and applied improvement projects increased participants' self-perceived skills, generated diverse improvement initiatives, and was associated with career advancement.
Neufeld, Nathan J; Hoyer, Erik H; Cabahug, Philippines; González-Fernández, Marlís; Mehta, Megha; Walker, N Colbey; Powers, Richard L; Mayer, R Samuel
2013-01-01
Lean Six Sigma (LSS) process analysis can be used to increase completeness of discharge summary reports used as a critical communication tool when a patient transitions between levels of care. The authors used the LSS methodology as an intervention to improve systems process. Over the course of the project, 8 required elements were analyzed in the discharge paperwork. The authors analyzed the discharge paperwork of patients (42 patients preintervention and 143 patients postintervention) of a comprehensive integrated inpatient rehabilitation program (CIIRP). Prior to this LSS project, 61.8% of required discharge elements were present. The intervention improved the completeness to 94.2% of the required elements. The percentage of charts that were 100% complete increased from 11.9% to 67.8%. LSS is a well-established process improvement methodology that can be used to make significant improvements in complex health care workflow issues. Specifically, the completeness of discharge documentation required for transition of care to CIIRP can be improved.
Patterson, Jan E.; Cadena, Jose; Prigmore, Teresa; Bowling, Jason; Ayala, Beth Ann; Kirkman, Leni; Parekh, Amruta; Scepanski, Theresa
2011-01-01
Significant gaps in quality and patient safety in the US health-care system have been identified and were reported in the past decade by the Institute of Medicine. Despite recognition of these gaps in “knowing versus doing,” change in health care is slow and difficult. The quality improvement and clinical safety movement is increasing among US medical centers. Our health science center implemented the UT System Clinical Safety and Effectiveness course, providing project-based teaching of quality-improvement tools and principles of patient safety. A quality-improvement project that increased healthcare workers' influenza vaccination rate by 17.8% from that in 2008 to a rate of 76.6% in 2009 serves as a paradigm of how physicians can lead quality-improvement project teams to narrow the quality chasm (1). Local efforts to narrow the chasm are discussed in the present paper, including inter-professional education in quality improvement and clinical safety. PMID:21686222
Hao, Yongchen; Liu, Jing; Liu, Jun; Smith, Sidney C; Huo, Yong; Fonarow, Gregg C; Ma, Changsheng; Ge, Junbo; Taubert, Kathryn A; Morgan, Louise; Guo, Yang; Zhang, Qian; Wang, Wei; Zhao, Dong
2016-09-01
A sizeable gap exists between guideline recommendations for treatment of acute coronary syndrome (ACS) and application of these recommendations in clinical practice. The CCC-ACS project is a novel national quality enhancement registry designed to help medical care providers bridge this gap, thereby improving clinical outcomes for ACS patients in China. The CCC-ACS project uses data collection, analysis, feedback, rapid-cycle improvement, and performance recognition to extend the use of evidence-based guidelines throughout the health care system and improve cardiovascular health. The project was launched in 2014, with 150 centers recruited representing the diversity of care for ACS patients in tertiary hospitals across China. Clinical information for patients with ACS is collected via a Web-based data collecting platform, including patients' demographics, medical history, symptoms on arrival, in-hospital treatment and procedures, in-hospital outcomes, and discharge medications for secondary prevention. Improvement in adherence to guideline recommendations is facilitated through monthly benchmarked hospital quality reports, recognition of hospital quality achievement, and regular webinars. As of April 16, 2016, a total of 35,616 ACS cases have been enrolled. The CCC-ACS is a national hospital-based quality improvement program, aiming to increase adherence to ACS guidelines in China and improve patient outcomes. Copyright © 2016 Elsevier Inc. All rights reserved.
Dryden Flight Research Center Critical Chain Project Management Implementation
NASA Technical Reports Server (NTRS)
Hines, Dennis O.
2012-01-01
In Fiscal Year 2011 Dryden Flight Research Center (DFRC) implemented a new project management system called Critical Chain Project Management (CCPM). Recent NASA audits have found that the Dryden workforce is strained under increasing project demand and that multi-tasking has been carried to a whole new level at Dryden. It is very common to have an individual work on 10 different projects during a single pay period. Employee surveys taken at Dryden have identified work/life balance as the number one issue concerning employees. Further feedback from the employees indicated that project planning is the area needing the most improvement. In addition, employees have been encouraged to become more innovative, improve job skills, and seek ways to improve overall job efficiency. In order to deal with these challenges, DFRC management decided to adopt the CCPM system that is specifically designed to operate in a resource constrained multi-project environment. This paper will discuss in detail the rationale behind the selection of CCPM and the goals that will be achieved through this implementation. The paper will show how DFRC is tailoring the CCPM system to the flight research environment as well as laying out the implementation strategy. Results of the ongoing implementation will be discussed as well as change management challenges and organizational cultural changes. Finally this paper will present some recommendations on how this system could be used by selected NASA projects or centers.
NASA Astrophysics Data System (ADS)
Radziszewska-Zielina, E.; Szewczyk, B.
2017-10-01
The aim of the article is to present examples of actions that can be undertaken in order to improve partnering cooperation in construction projects. These actions are a practical supplementation to the previously developed fuzzy system of controlling partnering relations in construction projects. The actions relate to 18 parameters of partnering relations that describe cooperation between a general contractor or a company that manages the project and four other participants: the contractors (subcontractors), the designer, the material and equipment suppliers and the real estate developer. The actions have been listed based on a review of subject literature, self-analysis, as well as interviews with participants of construction projects. They can provide examples of good practices that maintain partnering cooperation at a high level. Good cooperation, in turn, translates into a better performance of the project.
78 FR 24718 - Nez Perce-Clearwater National Forests; Idaho; Lolo Insect & Disease Project
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-26
... portions of the project area. Road decommissioning, culvert replacements, road improvements, and soils... to be cost-effective and provide maximum protection of soil and water quality. Big game, primarily... watershed restoration in the Lolo Creek drainage is associated with roads and soil improvement. Existing...
ERIC Educational Resources Information Center
Tlhoaele, Malefyane; Suhre, Cor; Hofman, Adriaan
2016-01-01
Cooperative learning may improve students' motivation, understanding of course concepts, and academic performance. This study therefore enhanced a cooperative, group-project learning technique with technology resources to determine whether doing so improved students' deep learning and performance. A sample of 118 engineering students, randomly…
International Service and Public Health Learning Objectives for Medical Students
ERIC Educational Resources Information Center
Block, Robert C.; Duron, Vincent; Creigh, Peter; McIntosh, Scott
2013-01-01
Objective: We aimed to improve the education of medical students involved in a longitudinal perinatal health improvement project in Gowa, Malawi. Design: We conducted qualitative interviews with students who participated in the project, reviewed their quantitative reports, and assessed the application of methodologies consonant with the learning…
The United States Environmental Protection Agency's National Exposure Research Laboratory has initiated a project to improve the methodology for modeling human exposure to motor vehicle emissions. The overall project goal is to develop improved methods for modeling the source t...
The United States Environmental Protection Agency's National Exposure Research Laboratory has initiated a project to improve the methodology for modeling human exposure to motor vehicle emissions. The overall project goal is to develop improved methods for modeling the source t...
The United States Environmental Protection Agency's National Exposure Research Laboratory has initiated a project to improve the methodology for modeling human exposure to motor vehicle emissions. The overall project goal is to develop improved methods for modeling the source t...
The United States Environmental Protection Agency's National Exposure Research Laboratory is pursuing a project to improve the methodology for modeling human exposure to motor vehicle emissions. The overall project is to develop improved methods for modeling the source through...
75 FR 15484 - Railroad Safety Technology Program Grant Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-29
... governments for projects that have a public benefit of improved railroad safety and efficiency. The program... State and local governments for projects * * * that have a public benefit of improved safety and network... minimum 20 percent grantee cost share (cash or in-kind) match requirement. DATES: FRA will begin accepting...
Encouraging International Perspectives through Collaborative Writing Assignments.
ERIC Educational Resources Information Center
Dittman, Nancy A.
The administrative communications course at Bloomsburg University has dual goals: to improve written and oral communication skills and to improve global business communication skills. Thus an opportunity exists to create projects that require graduate students to learn about other countries and other peoples. A project--writing a business plan for…
Essays and Addresses on Composition.
ERIC Educational Resources Information Center
Summerfield, Geoffrey, Ed.
The following book on composition in the elementary school grows out of the activities of the Tri-University Project (now called the Nebraska TTT Institute in Elementary Education). The project is concerned with improving the education of young children by working to improve the education of the teachers in Higher Education who educate the…
Work Life Improvements for Home Care Workers: Impact and Feasibility.
ERIC Educational Resources Information Center
Feldman, Penny Hollander
1993-01-01
Evaluated four work life demonstration projects designed to upgrade home aide employment, reduce turnover, and increase continuity of care. Found that projects reduced worker turnover in experimental groups from 10 to 44 percentage points. Where it was measured, continuity of care also significantly improved. Local political, economic, and…
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
This two-page performance spotlight describes how, in 2004, Austin Energy (the electric utility for the city of Austin, Texas) began saving about $1.2 million in energy and maintenance costs annually as a direct result of a pumping system efficiency project.
ERIC Educational Resources Information Center
Mosenthal, Peter B.; Hinchman, Kathleen A.
An evaluation of this Syracuse, New York workplace literacy skills improvement project had three purposes: to characterize changes in the baseline performance of adults' workplace literacy skills as a function of instructional treatment; to characterize changes in workers' and supervisors' perceptions of worker effectiveness as a function of…
Faculty Perceptions of Technology Projects
ERIC Educational Resources Information Center
Ransom, Whitney; Graham, Charles R.; Mott, Jon
2007-01-01
The Center for Teaching and Learning (CTL), formerly the Center for Instructional Design at Brigham Young University (BYU), partners with faculty to help improve teaching and learning. The CTL currently supports a broad range of faculty projects to maintain and improve on-campus instruction. It has more than 35 full-time employees and…
Improving Time Management for the Working Student.
ERIC Educational Resources Information Center
Anderson, Tim; Lott, Rod; Wieczorek, Linda
This action research project implemented and evaluated a program for increasing time spent on homework. The project was intended to improve academic achievement among five employed high school students taking geometry and physical science who were also employed more than 15 hours per week. The problem of lower academic achievement due to…
Health Activities Project (HAP): Action/Reaction Module.
ERIC Educational Resources Information Center
Buller, Dave; And Others
Contained within this Health Activities Project (HAP) learning packet are activities for children in grades 5-8. Design of the activities centers around the idea that students can control their own health and safety. Within this module are teacher and student folios describing activities in timing, improving, and practicing to improve reaction…
Project A+: School Based Improvement in AISD, 1991-92.
ERIC Educational Resources Information Center
Austin Independent School District, TX. Office of Research and Evaluation.
Outcomes of Project A+, a school-based improvement (SBI) partnership developed between International Business Machines (IBM) and the Austin Independent School District, are described in this document. SBI is a vehicle for restructuring schools to meet the goal that all students will function successfully at or beyond their appropriate grade…
Atmospheric Science Data Center
2018-06-15
... The Prediction of Worldwide Energy Resource (POWER) project was initiated to improve upon the current SSE ... continue to be focussed on the solar and wind Renewable Energy industry. New data sets will target Sustainable Buildings ... The Prediction of Worldwide Energy Resource (POWER) project was initiated to improve upon the current SSE ...
Core-Course Faculty Development Series on Methodology.
ERIC Educational Resources Information Center
Alewynse, John
This report describes a three-year project at Hampton University (Virginia) to improve the core freshman year curriculum and, ultimately, to improve student learning outcomes. The project involved the development of annual week-long seminars on the teaching of freshman courses in composition, speech, history, and mathematics. Emphasis was on…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-28
... local agencies in improving safety on local roads is critical for reducing fatalities and serious..., prioritizing, developing, and implementing safety projects on local roads. The requested information collection... agencies for road safety improvement projects. The survey will also help identify challenges and barriers...
Chapter 17. Guidelines for restoration and rehabilitation of principal plant communities
Richard Stevens; Stephen B. Monsen
2004-01-01
Range and wildland improvement projects conducted throughout the Intermountain region normally occur within specific plant communities. Each plant community has unique features that require different equipment, planting techniques, and plant materials to conduct improvement projects. Plant communities or associations discussed in this chapter are: (1) subalpine...
DOT National Transportation Integrated Search
2017-06-01
As part of an Urban Partnership Agreement project, the Minnesota Department of Transportation added lanes : and began operating a priced dynamic shoulder lane (PDSL) on parts of Interstate 35W. Following the opening of : these improvements, the frequ...
Strategic School Funding for Improved Student Achievement
ERIC Educational Resources Information Center
Chambers, Jay G.; Brown, James R.; Levin, Jesse; Jubb, Steve; Harper, Dorothy; Tolleson, Ray; Manship, Karen
2010-01-01
This article features Strategic School Funding for Results (SSFR) project, a new joint initiative of the American Institutes for Research (AIR) and Pivot Learning Partners (PLP) aimed at improving school finance, human resources, and management systems in large urban school districts. The goal of the project is to develop and implement more…
Developing a performance data suite to facilitate lean improvement in a chemotherapy day unit.
Lingaratnam, Senthil; Murray, Danielle; Carle, Amber; Kirsa, Sue W; Paterson, Rebecca; Rischin, Danny
2013-07-01
A multidisciplinary team from the Peter MacCallum Cancer Centre in Melbourne, Australia, developed a performance data suite to support a service improvement project based on lean manufacturing principles in its 19-chair chemotherapy day unit (CDU) and cytosuite chemotherapy production facility. The aims of the project were to reduce patient wait time and improve equity of access to the CDU. A project team consisting of a pharmacist and CDU nurse supported the management team for 10 months in engaging staff and customers to identify waste in processes, analyze root causes, eliminate non-value-adding steps, reduce variation, and level workloads to improve quality and flow. Process mapping, staff and patient tracking and opinion surveys, medical record audits, and interrogation of electronic treatment records were undertaken. This project delivered a 38% reduction in median wait time on the day (from 32 to 20 minutes; P < .01), 7-day reduction in time to commencement of treatment for patients receiving combined chemoradiotherapy regimens (from 25 to 18 days; P < .01), and 22% reduction in wastage associated with expired drug and pharmacy rework (from 29% to 7%; P < .01). Improvements in efficiency enabled the cytosuite to increase the percentage of product manufactured within 10 minutes of appointment times by 29% (from 47% to 76%; P < .01). A lean improvement methodology provided a robust framework for improved understanding and management of complex system constraints within a CDU, resulting in improved access to treatment and reduced waiting times on the day.
Wong, Cynthia A; Scott, Shirley; Jones, Robin L; Walzer, Jennifer; Geller, Stacie
2016-03-01
The Illinois Department of Public Health mandated that all clinicians who provide care to obstetric patients participate in the Illinois Obstetric Hemorrhage Project. The aim of the current report is to describe change in knowledge among providers engaged in the project, as assessed by pre- and post-tests. The project, implemented 2008 to 2010, included four components: a written 25-item multiple-choice examination (pre-test), a didactic lecture, skill stations (for teaching blood loss estimation), and a simulation drill and debriefing. Participants completed a post-test 6 months later. Pre- and post-test examination scores were compared. Data from 95 hospitals are included in this analysis (9456 paired test results). The proportion of participants who scored ≥88% correct answers increased from 10.9% on the pre-test to 49.1% on the post-test (p < 0.0001). Registered nurses made greater improvements in test scores than anesthesia and obstetric providers (p < 0.0001). The Illinois Obstetric Hemorrhage Project was successful in improving knowledge of obstetric hemorrhage in a large number of providers with different expertise and experience levels. Further long-term study is essential to determine whether the skills acquired during the Project contribute to improved obstetric hemorrhage outcomes for the women of Illinois.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Janke, C.J.
Electron beam (EB) curing is a technology that promises, in certain applications, to deliver lower cost and higher performance polymer matrix composite (PMC) structures compared to conventional thermal curing processes. PMCs enhance performance by making products lighter, stronger, more durable, and less energy demanding. They are essential in weight- and performance-dominated applications. Affordable PMCs can enhance US economic prosperity and national security. US industry expects rapid implementation of electron beam cured composites in aircraft and aerospace applications as satisfactory properties are demonstrated, and implementation in lower performance applications will likely follow thereafter. In fact, at this time and partly becausemore » of discoveries made in this project, field demonstrations are underway that may result in the first fielded applications of electron beam cured composites. Serious obstacles preventing the widespread use of electron beam cured PMCs in many applications are their relatively poor interfacial properties and resin toughness. The composite shear strength and resin toughness of electron beam cured carbon fiber reinforced epoxy composites were about 25% and 50% lower, respectively, than those of thermally cured composites of similar formulations. The essential purpose of this project was to improve the mechanical properties of electron beam cured, carbon fiber reinforced epoxy composites, with a specific focus on composite shear properties for high performance aerospace applications. Many partners, sponsors, and subcontractors participated in this project. There were four government sponsors from three federal agencies, with the US Department of Energy (DOE) being the principal sponsor. The project was executed by Oak Ridge National Laboratory (ORNL), NASA and Department of Defense (DOD) participants, eleven private CRADA partners, and two subcontractors. A list of key project contacts is provided in Appendix A. In order to properly manage the large project team and properly address the various technical tasks, the CRADA team was organized into integrated project teams (IPT's) with each team focused on specific research areas. Early in the project, the end user partners developed ''exit criteria'', recorded in Appendix B, against which the project's success was to be judged. The project team made several important discoveries. A number of fiber coatings or treatments were developed that improved fiber-matrix adhesion by 40% or more, according to microdebond testing. The effects of dose-time and temperature-time profiles during the cure were investigated, and it was determined that fiber-matrix adhesion is relatively insensitive to the irradiation procedure, but can be elevated appreciably by thermal postcuring. Electron beam curable resin properties were improved substantially, with 80% increase in electron beam 798 resin toughness, and {approx}25% and 50% improvement, respectively, in ultimate tensile strength and ultimate tensile strain vs. earlier generation electron beam curable resins. Additionally, a new resin electron beam 800E was developed with generally good properties, and a very notable 120% improvement in transverse composite tensile strength vs. earlier generation electron beam cured carbon fiber reinforced epoxies. Chemical kinetics studies showed that reaction pathways can be affected by the irradiation parameters, although no consequential effects on material properties have been noted to date. Preliminary thermal kinetics models were developed to predict degree of cure vs. irradiation and thermal parameters. These models are continually being refined and validated. Despite the aforementioned impressive accomplishments, the project team did not fully realize the project objectives. The best methods for improving adhesion were combined with the improved electron beam 3K resin to make prepreg and uni-directional test laminates from which composite properties could be determined. Nevertheless, only minor improvements in the composite shear strength, and moderate improvements in the transverse tensile strength, were achieved. The project team was not satisfied with the laminate quality achieved, and low quality (specifically, high void fraction) laminates will compromise the composite properties. There were several problems with the prepregging and fabrication, many of them related to the use of new fiber treatments.« less
Crall, James J; Illum, Jackie; Martinez, Ana; Pourat, Nadereh
2016-06-01
Despite the high rate of untreated tooth decay, many young children in California under six years of age have never been to a dentist. Numerous and complex barriers to access to oral health care for young children exist, and a multifaceted approach is required to improve receipt of preventive and treatment services that could improve the oral health of this population. This policy brief describes the UCLA-First 5 LA 21st Century Dental Homes Project, which was designed to improve oral health care for young children in 12 Federally Qualified Health Center (FQHC) clinic sites with co-located dental and primary care services and its accessibility in their service areas throughout Los Angeles County. The project funded infrastructure and staffing, provided technical assistance to improve operations, trained clinical personnel to provide oral health care to young children, implemented a quality improvement learning collaborative, trained parents and child care providers in oral hygiene and healthy habits, and disseminated information to promote effective policies. Early data on the project indicated twofold increases in delivery of both diagnostics and treatment visits for young children, and a threefold increase in preventive services for young children during the program.
Whitten, Stacey K; Stanik-Hutt, Julie
2013-07-01
To enhance outcomes of patients with chronic noncancer pain (CNCP) treated with opioids in a primary care setting by implementing an evidence-based quality improvement project. The project consisted of the implementation of a 6-week cognitive behavioral therapy (CBT) program. Twenty-two patients with CNCP completed the program. Impact of the project was evaluated by comparing pre- and postintervention participant self-reports of mood on the Beck Depression Inventory and functional status on the Brief Pain Inventory and Short Form-36. Patient perception of treatment benefit was also measured using the Patient Global Impression of Change. Qualitative provider perceptions of the program were also collected. Paired t-test statistics were used to analyze the data. Mood (including negative attitude, performance difficulty, and physical complaints), and patient impression of treatment benefit improved significantly after CBT was added. Primary care providers reported that the CBT supported their overall management of these complex patients. The addition of a CBT program improved selected outcomes in this self-selected sample of patients with CNCP treated with opioids. ©2012 The Author(s) ©2012 American Association of Nurse Practitioners.
Bergh, Anne-Marie; Bac, Martin; Hugo, Jannie; Sandars, John
2016-07-11
Quality improvement is increasingly becoming an essential aspect of the medical curriculum, with the intention of improving the health care system to provide better health care. The aim of this study was to explore undergraduate medical students' experiences of their involvement in quality improvement projects during a district health rotation. Student group reports from rotations in learning centres of the University of Pretoria in Mpumalanga Province, South Africa were analysed for the period 2012 to 2015. Interviews were conducted with health care providers at four learning centres in 2013. Three main themes were identified: (1) 'Situated learning', describing students' exposure to the discrepancies between ideal and reality in a real-life situation and how they learned to deal with complex situations, individually and as student group; (2) 'Facing dilemmas', describing how students were challenged about the non-ideal reality; (3) 'Making a difference', describing the impact of the students' projects, with greater understanding of themselves and others through working in teams but also making a change in the health care system. Quality improvement projects can provide an opportunity for both the transformation of health care and for transformative learning, with individual and 'collective' self-authorship.
Bandesha, G; Litva, A
2005-09-01
The new public health rejects old individualist attempts at improving health and embraces community-based approaches in reducing health inequalities. Primary Care Trusts in England face the challenge of converting community participation in health into reality. This study explores differences in perception of participation between lay and professional stakeholders of a community health project for a South Asian population in Greater Manchester. In-depth interviews and focus groups were used to explore the views of professional and lay stakeholders. All data were audio-taped, transcribed and analysed for emerging themes using a qualitative framework. Professionals talked of working in partnership with the community but lay stakeholders did not feel that they had control over the project. There were problems in engaging the community and local health professionals in the project. Lack of cultural awareness hampered participation in the project. There was agreement that the project improved the self-confidence of participants and created a more informed population. However, there was little support for claims of improvements in social cohesion and changes in lifestyle directly as a result of the project. Converting the rhetoric of community participation in health into reality is a greater challenge than was envisaged by policy makers. Marginalized communities may not be willing participants and issues of language and cultural sensitivity are important. Project outcomes need to be agreed to ensure projects are evaluated appropriately. Projects with South Asian communities should not be seen to be dealing with all 'ethnic health' issues without addressing changes in statutory organizations and other wider social determinants of health.
Zhou, Zhengdong; Guan, Shaolin; Xin, Runchao; Li, Jianbo
2018-06-01
Contrast-enhanced subtracted breast computer tomography (CESBCT) images acquired using energy-resolved photon counting detector can be helpful to enhance the visibility of breast tumors. In such technology, one challenge is the limited number of photons in each energy bin, thereby possibly leading to high noise in separate images from each energy bin, the projection-based weighted image, and the subtracted image. In conventional low-dose CT imaging, iterative image reconstruction provides a superior signal-to-noise compared with the filtered back projection (FBP) algorithm. In this paper, maximum a posteriori expectation maximization (MAP-EM) based on projection-based weighting imaging for reconstruction of CESBCT images acquired using an energy-resolving photon counting detector is proposed, and its performance was investigated in terms of contrast-to-noise ratio (CNR). The simulation study shows that MAP-EM based on projection-based weighting imaging can improve the CNR in CESBCT images by 117.7%-121.2% compared with FBP based on projection-based weighting imaging method. When compared with the energy-integrating imaging that uses the MAP-EM algorithm, projection-based weighting imaging that uses the MAP-EM algorithm can improve the CNR of CESBCT images by 10.5%-13.3%. In conclusion, MAP-EM based on projection-based weighting imaging shows significant improvement the CNR of the CESBCT image compared with FBP based on projection-based weighting imaging, and MAP-EM based on projection-based weighting imaging outperforms MAP-EM based on energy-integrating imaging for CESBCT imaging.
ERIC Educational Resources Information Center
Nurss, Joanne R.; And Others
This report describes Blalock FIRST, a 3-year collaborative research project designed to improve literacy skills of low-income, African American families living in a severely depressed urban housing project. Project implementation, and antecedents to the implementation, are described. Objectives of the project were to: (1) increase achievement in…
ERIC Educational Resources Information Center
Kanter, David E.
2010-01-01
Project-based science curricula can improve students' usable or meaningful understanding of the science content underlying a project. However, such curricula designed around "performances" wherein students design or make something do not always do this. We researched ways to design performance project-based science curricula (pPBSc) to better…
TA 55 Reinvestment Project II Phase C Update Project Status May 23, 2017
DOE Office of Scientific and Technical Information (OSTI.GOV)
Giordano, Anthony P.
The TA-55 Reinvestment Project (TRP) II Phase C is a critical infrastructure project focused on improving safety and reliability of the Los Alamos National Laboratory (LANL) TA-55 Complex. The Project recapitalizes and revitalizes aging and obsolete facility and safety systems providing a sustainable nuclear facility for National Security Missions.
DOT National Transportation Integrated Search
2016-07-01
Federal and state transportation planning statutory and regulatory laws require transportation projects to be : consistent with transportation plans and improvement programs before a federal action can be taken on a : project requiring one. Significa...
Web-Based Project Portfolio Management Portal Success: A Quantitative Investigation
ERIC Educational Resources Information Center
Excellent, Frendy
2013-01-01
Due to its centralized content-sharing features, a project portfolio management (PPM) portal enables vertical, as well as horizontal, electronic exchanges between project professionals. Such exchanges, if effective, may deliver an individual impact through improved project performance. Effectiveness engenders use and satisfaction, reflecting the…
Stockdale, Susan E; Zuchowski, Jessica; Rubenstein, Lisa V; Sapir, Negar; Yano, Elizabeth M; Altman, Lisa; Fickel, Jacqueline J; McDougall, Skye; Dresselhaus, Timothy; Hamilton, Alison B
Although the patient-centered medical home endorses quality improvement principles, methods for supporting ongoing, systematic primary care quality improvement have not been evaluated. We introduced primary care quality councils at six Veterans Health Administration sites as an organizational intervention with three key design elements: (a) fostering interdisciplinary quality improvement leadership, (b) establishing a structured quality improvement process, and (c) facilitating organizationally aligned frontline quality improvement innovation. Our evaluation objectives were to (a) assess design element implementation, (b) describe implementation barriers and facilitators, and (c) assess successful quality improvement project completion and spread. We analyzed administrative records and conducted interviews with 85 organizational leaders. We developed and applied criteria for assessing design element implementation using hybrid deductive/inductive analytic techniques. All quality councils implemented interdisciplinary leadership and a structured quality improvement process, and all but one completed at least one quality improvement project and a toolkit for spreading improvements. Quality councils were perceived as most effective when service line leaders had well-functioning interdisciplinary communication. Matching positions within leadership hierarchies with appropriate supportive roles facilitated frontline quality improvement efforts. Two key resources were (a) a dedicated internal facilitator with project management, data collection, and presentation skills and (b) support for preparing customized data reports for identifying and addressing practice level quality issues. Overall, quality councils successfully cultivated interdisciplinary, multilevel primary care quality improvement leadership with accountability mechanisms and generated frontline innovations suitable for spread. Practice level performance data and quality improvement project management support were critical. In order to successfully facilitate systematic, sustainable primary care quality improvement, regional and executive health care system leaders should engage interdisciplinary practice level leadership in a priority-setting process that encourages frontline innovation and establish local structures such as quality councils to coordinate quality improvement initiatives, ensure accountability, and promote spread of best practices.
Gimbel, Sarah; Mwanza, Moses; Nisingizwe, Marie Paul; Michel, Cathy; Hirschhorn, Lisa
2017-12-21
High-quality data are critical to inform, monitor and manage health programs. Over the seven-year African Health Initiative of the Doris Duke Charitable Foundation, three of the five Population Health Implementation and Training (PHIT) partnership projects in Mozambique, Rwanda, and Zambia introduced strategies to improve the quality and evaluation of routinely-collected data at the primary health care level, and stimulate its use in evidence-based decision-making. Using the Consolidated Framework for Implementation Research (CFIR) as a guide, this paper: 1) describes and categorizes data quality assessment and improvement activities of the projects, and 2) identifies core intervention components and implementation strategy adaptations introduced to improve data quality in each setting. The CFIR was adapted through a qualitative theme reduction process involving discussions with key informants from each project, who identified two domains and ten constructs most relevant to the study aim of describing and comparing each country's data quality assessment approach and implementation process. Data were collected on each project's data quality improvement strategies, activities implemented, and results via a semi-structured questionnaire with closed and open-ended items administered to health management information systems leads in each country, with complementary data abstraction from project reports. Across the three projects, intervention components that aligned with user priorities and government systems were perceived to be relatively advantageous, and more readily adapted and adopted. Activities that both assessed and improved data quality (including data quality assessments, mentorship and supportive supervision, establishment and/or strengthening of electronic medical record systems), received higher ranking scores from respondents. Our findings suggest that, at a minimum, successful data quality improvement efforts should include routine audits linked to ongoing, on-the-job mentoring at the point of service. This pairing of interventions engages health workers in data collection, cleaning, and analysis of real-world data, and thus provides important skills building with on-site mentoring. The effect of these core components is strengthened by performance review meetings that unify multiple health system levels (provincial, district, facility, and community) to assess data quality, highlight areas of weakness, and plan improvements.
2013-01-01
Background The Japan International Cooperation Agency (JICA) has focused its attention on appraising health development assistance projects and redirecting efforts towards health system strengthening. This study aimed to describe the type of project and targets of interest, and assess the contribution of JICA health-related projects to strengthening health systems worldwide. Methods We collected a web-based Project Design Matrix (PDM) of 105 JICA projects implemented between January 2005 and December 2009. We developed an analytical matrix based on the World Health Organization (WHO) health system framework to examine the PDM data and thereby assess the projects’ contributions to health system strengthening. Results The majority of JICA projects had prioritized workforce development, and improvements in governance and service delivery. Conversely, there was little assistance for finance or medical product development. The vast majority (87.6%) of JICA projects addressed public health issues, for example programs to improve maternal and child health, and the prevention and treatment of infectious diseases such as AIDS, tuberculosis and malaria. Nearly 90% of JICA technical healthcare assistance directly focused on improving governance as the most critical means of accomplishing its goals. Conclusions Our study confirmed that JICA projects met the goals of bilateral cooperation by developing workforce capacity and governance. Nevertheless, our findings suggest that JICA assistance could be used to support financial aspects of healthcare systems, which is an area of increasing concern. We also showed that the analytical matrix methodology is an effective means of examining the component of health system strengthening to which the activity and output of a project contributes. This may help policy makers and practitioners focus future projects on priority areas. PMID:24053583
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
In 1998, GKN Sinter Metals completed a successful compressed air system improvement project at its Salem, Indiana manufacturing facility. The project was performed after GKN undertook a survey of its system in order to solve air quality problems and to evaluate whether the capacity of their compressed air system would meet their anticipated plant expansion. Once the project was implemented, the plant was able to increase production by 31% without having to add any additional compressor capacity.
Ural-Tweed Bighorn Sheep Wildlife Mitigation Project, 1984-1990 Final Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Young, Lewis R.; Yde, Chris A.
The results of habitat improvement project activities accomplished under contract No.84-38 for bighorn sheep mitigation along Koocanusa Reservoir from September 1, 1984, through June 30, 1990, are reported here. Habitat treatments were applied to ten areas and covered 1100 acres. Treatments used were prescribed fire, slashing combined with prescribed fire, and fertilization. Several variations in season or intensity were used within the slashing and prescribed fire treatments. This project was coordinated with and complemented concurrent Kootenai National Forest habitat improvement activities.
SLAC modulator system improvements and reliability results
DOE Office of Scientific and Technical Information (OSTI.GOV)
Donaldson, A.R.
1998-06-01
In 1995, an improvement project was completed on the 244 klystron modulators in the linear accelerator. The modulator system has been previously described. This article offers project details and their resulting effect on modulator and component reliability. Prior to the project, the authors had collected four operating cycles (1991 through 1995) of MTTF data. In this discussion, the '91 data will be excluded since the modulators operated at 60 Hz. The five periods following the '91 run were reviewed due to the common repetition rate at 120 Hz.
Neubeck, Truls; Elg, Mattias; Schneider, Thomas; Andersson-Gäre, Boel
2014-01-01
Introduction: This study examines the use of quality-improvement (QI) methods in social services. Particularly the key aspects—generalizable knowledge, interprofessional teamwork, and measurements—are studied in projects from the QI program Forum for Values in Sweden. Methods: This is a mixed-method case study. Two projects using standard QI methods and tools as used in health care were chosen as critical cases to highlight some problems and prospects with the use of QI in social services. The cases were analyzed through documented results and qualitative interviews with participants one year after the QI projects ended. Results: The social service QI projects led to measurable improvements when they used standard methods and tools for QI in health care. One year after the projects, the improvements were either not continuously measured or not reported in any infrastructure for measurements. The study reveals that social services differ from health care regarding the availability and use of evidence, the role of professional expertise, and infrastructure for measurements. Conclusions: We argue that QI methods as used in health care are applicable in social services and can lead to measurable improvements. The study gives valuable insights for QI, not only in social services but also in health care, on how to assess and sustain improvements when infrastructures for measurements are lacking. In addition, when one forms QI teams, the focus should be on functions instead of professions, and QI methods can be used to support implementation of evidence-based practice. PMID:24867549
The NCC project: A quality management perspective
NASA Technical Reports Server (NTRS)
Lee, Raymond H.
1993-01-01
The Network Control Center (NCC) Project introduced the concept of total quality management (TQM) in mid-1990. The CSC project team established a program which focused on continuous process improvement in software development methodology and consistent deliveries of high quality software products for the NCC. The vision of the TQM program was to produce error free software. Specific goals were established to allow continuing assessment of the progress toward meeting the overall quality objectives. The total quality environment, now a part of the NCC Project culture, has become the foundation for continuous process improvement and has resulted in the consistent delivery of quality software products over the last three years.
Analysis of Phoenix Anomalies and IV & V Findings Applied to the GRAIL Mission
NASA Technical Reports Server (NTRS)
Larson, Steve
2012-01-01
NASA IV&V was established in 1993 to improve safety and cost-effectiveness of mission critical software. Since its inception the tools and strategies employed by IV&V have evolved. This paper examines how lessons learned from the Phoenix project were developed and applied to the GRAIL project. Shortly after selection, the GRAIL project initiated a review of the issues documented by IV&V for Phoenix. The motivation was twofold: the learn as much as possible about the types of issues that arose from the flight software product line slated for use on GRAIL, and to identify opportunities for improving the effectiveness of IV&V on GRAIL. The IV&V Facility provided a database dump containing 893 issues. These were categorized into 16 bins, and then analyzed according to whether the project responded by changing the affected artifacts or using as-is. The results of this analysis were compared to a similar assessment of post-launch anomalies documented by the project. Results of the analysis were discussed with the IV&V team assigned to GRAIL. These discussions led to changes in the way both the project and IV&V approached the IV&V task, and improved the efficiency of the activity.
Sears Point Tidal Marsh Restoration Project: Phase I
Information about the SFBWQP Sears Point Tidal Marsh Restoration Project: Phase I project, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.
25 CFR 170.202 - Does the Relative Need Distribution Factor allocate funding among tribes?
Code of Federal Regulations, 2012 CFR
2012-04-01
... self-governance tribes that negotiate IRR construction projects into their AFA, and distributed to BIA... a construction project, the project must be included in an FHWA-approved Transportation Improvement...
25 CFR 170.202 - Does the Relative Need Distribution Factor allocate funding among tribes?
Code of Federal Regulations, 2013 CFR
2013-04-01
... self-governance tribes that negotiate IRR construction projects into their AFA, and distributed to BIA... a construction project, the project must be included in an FHWA-approved Transportation Improvement...
25 CFR 170.202 - Does the Relative Need Distribution Factor allocate funding among tribes?
Code of Federal Regulations, 2014 CFR
2014-04-01
... self-governance tribes that negotiate IRR construction projects into their AFA, and distributed to BIA... a construction project, the project must be included in an FHWA-approved Transportation Improvement...
25 CFR 170.202 - Does the Relative Need Distribution Factor allocate funding among tribes?
Code of Federal Regulations, 2011 CFR
2011-04-01
... self-governance tribes that negotiate IRR construction projects into their AFA, and distributed to BIA... a construction project, the project must be included in an FHWA-approved Transportation Improvement...
25 CFR 170.202 - Does the Relative Need Distribution Factor allocate funding among tribes?
Code of Federal Regulations, 2010 CFR
2010-04-01
... self-governance tribes that negotiate IRR construction projects into their AFA, and distributed to BIA... a construction project, the project must be included in an FHWA-approved Transportation Improvement...
Venezuela's Bolivarian Schools Project.
ERIC Educational Resources Information Center
Diaz, Maria Magnolia Santamaria
2002-01-01
Discusses efforts by the Venezuelan government to improve the nation's school infrastructure through the Bolivarian Schools Project administered by the Ministry of Education, Culture and Sport. The project set educational principles which are guiding current school building efforts. (EV)
Multiple R&D projects scheduling optimization with improved particle swarm algorithm.
Liu, Mengqi; Shan, Miyuan; Wu, Juan
2014-01-01
For most enterprises, in order to win the initiative in the fierce competition of market, a key step is to improve their R&D ability to meet the various demands of customers more timely and less costly. This paper discusses the features of multiple R&D environments in large make-to-order enterprises under constrained human resource and budget, and puts forward a multi-project scheduling model during a certain period. Furthermore, we make some improvements to existed particle swarm algorithm and apply the one developed here to the resource-constrained multi-project scheduling model for a simulation experiment. Simultaneously, the feasibility of model and the validity of algorithm are proved in the experiment.
Holve, Erin
2013-01-01
Multi-institutional research and quality improvement (QI) projects using electronic clinical data (ECD) hold great promise for improving quality of care and patient outcomes but typically require significant infrastructure investments both to initiate and maintain the project over its duration. Consequently, it is important for these projects to think holistically about sustainability to ensure their long-term success. Four “pillars” of sustainability are discussed based on the experiences of EDM Forum grantees and other research and QI networks. These include trust and value, governance, management, and financial and administrative support. Two “foundational considerations,” adaptive capacity and policy levers, are also discussed. PMID:25848557
Improving care transitions through meaningful use stage 2: continuity of care document.
Murphy, Lyn Stankiewicz; Wilson, Marisa L; Newhouse, Robin P
2013-02-01
In this department, Drs Murphy, Wilson, and Newhouse highlight hot topics in nursing outcomes, research, and evidence-based practice relevant to the nurse administrator. The goal is to discuss the practical implications for nurse leaders in diverse healthcare settings. Content includes evidence-based projects and decision making, locating measurement tools for quality improvement and safety projects, using outcome measures to evaluate quality, practice implications of administrative research, and exemplars of projects that demon strate innovative approaches to organizational problems. In this article, the authors describe the elements of continuity of care documentation, how sharing information can improve the quality and safety of care transitions and the implications for nurse executives.
King, David A.; Bachelet, Dominique M.; Symstad, Amy J.
2013-01-01
Since the initial application of MC1 to a small portion of WICA (Bachelet et al. 2000), the model has been altered to improve model performance with the inclusion of dynamic fire. Applying this improved version to WICA required substantial recalibration, during which we have made a number of improvements to MC1 that will be incorporated as permanent changes. In this report we document these changes and our calibration procedure following a brief overview of the model. We compare the projections of current vegetation to the current state of the park and present projections of vegetation dynamics under future climates downscaled from three GCMs selected to represent the existing range in available GCM projections. In doing so, we examine the consequences of different management options regarding fire and grazing, major aspects of biotic management at Wind Cave.
Code of Federal Regulations, 2010 CFR
2010-07-01
... knowledge to improve the lives of individuals with disabilities. (2) The proposed project complements... Field-Initiated Project applications for funding? 350.55 Section 350.55 Education Regulations of the..., DEPARTMENT OF EDUCATION DISABILITY AND REHABILITATION RESEARCH PROJECTS AND CENTERS PROGRAM How Does the...
RCP Local School Projects in Alabama.
ERIC Educational Resources Information Center
Regional Curriculum Project, Atlanta, GA.
One of 6 state reports generated by the Regional Curriculum Project (funded under the Elementary and Secondary Education Act), the document describes 4 specific projects implemented through the Alabama State Superintendent's Office beginning in 1966. All 4 projects were designed to improve instructional leadership by defining the role(s) of the…
Nutritional considerations in project planning.
Mason, J; Garcia, M; Mitchell, J; Test, K; Henderson, C; Tabatabai, H
1985-05-01
This paper discusses procedures for "ex ante" assessment of likely nutritional effects of development projects. Reported are results of 1 field trial in the Philippines of the "ex ante" assessment procedure in terms of: its feasibility and timeliness and the recommendations for project design that can be made and their influence. In the procedure described, emphasis is placed on assessing likely direct effects--through income, environmental changes and access to services. Indirect effects through food output and prices are assessed qualitatievly. 2 primary questions are addressed in the "ex ante" assessment: 1) who is to benefit directly from the project, in relation to their need (measured in terms of nutrition) and 2) is there reason to suppose that these benefits will not improve their nutrition? The procedure began with an initial assessment to identify the main issues based on reviewing existing data and a short field visit; since there was insufficient information, a rapid nutrition survey was conducted and analyzed; recommendations for project design were made within the necessary time for inclusion. The assessment of the large-scale development project in the Philippines indicates priority to remote areas, small farmers and subsistence fishermen. It is concluded that production-oriented components (e.g., agricultural and infrastructure development) of the project appear likely to improve nutrition insofar as they reach the priority groups defiend above. There is little reason to believe that increased income will not improve nutrition. Finally, there is evidence that an intervention to improve water supply is likely to be effective. Limitations of the procedure are that the assessment is limitied to direct, microlevel effects; long-term influences on nutrition, through changes in the overall economy of the area, are not assessed. Also, the data used cannot easily quantify expected effects on nutrition of project participants. Future application of such procedures are seen to be important if they can be fully integrated with the overall project planning.
Munn, Zachary; Scarborough, Alan; Pearce, Susanne; McArthur, Alexa; Kavanagh, Sheila; Girdler, Michelle; Stefan-Rasmus, Bernie; Breen, Helen; Farquhar, Shirley; Li, Jessie; Hutchinson, Steven; Stephenson, Matthew; McBeth, Helen; Kitson, Alison
2015-09-16
Medication errors present a significant risk to patient safety. The "rights" of medication administration represent one approach to potentially reducing this risk. The aim of this project was to implement an evidence-based audit and feedback project to improve compliance with best practice in this area across a health network. A baseline audit was conducted to determine compliance with evidence-based standards by trained observers. The results of this audit were analysed and fed back to staff. An analysis of barriers to compliance was undertaken by key staff within the organization, which was followed by the implementation of targeted strategies to improve compliance. A follow-up audit was conducted and the results compared to the baseline audit. There were improvements in the percentage of compliance across all of the eight criteria audited, with statistically significant improvements found in six of the eight. In general, compliance with the criteria was high in both the baseline and follow-up audits. This audit and feedback implementation project was successful in increasing compliance and knowledge in this area and providing future direction for sustaining evidence-based practice change. It is now planned to use this approach for rolling out future implementation projects within this health system. The Joanna Briggs Institute.
ERIC Educational Resources Information Center
Chung, Henry; Klein, Michael C.; Silverman, Daniel; Corson-Rikert, Janet; Davidson, Eleanor; Ellis, Patricia; Kasnakian, Caroline
2011-01-01
Objective: To implement a pilot quality improvement project for depression identification and treatment in college health. Participants: Eight college health center teams composed primarily of primary care and counseling service directors and clinicians. Methods: Chronic (Collaborative) Care Model (CCM) used with standardized screening to…
Improving First Year Mathematics Teaching through Making Connections: An Action Research Approach
ERIC Educational Resources Information Center
Balatti, Jo; Belward, Shaun
2012-01-01
Four university lecturers at an Australian university have been undertaking an action research project for almost two years to improve first year mathematics teaching. The project is analysed here through the single idea of "connection". Making new connections or changing the nature of existing connections with colleagues and especially…
Student Team Projects in Information Systems Development: Measuring Collective Creative Efficacy
ERIC Educational Resources Information Center
Cheng, Hsiu-Hua; Yang, Heng-Li
2011-01-01
For information systems development project student teams, learning how to improve software development processes is an important training. Software process improvement is an outcome of a number of creative behaviours. Social cognitive theory states that the efficacy of judgment influences behaviours. This study explores the impact of three types…
Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May 19, 1998.
ERIC Educational Resources Information Center
Alaska State Dept. of Education, Juneau.
This workshop addresses the application process for capital improvement funding from the state, e.g., who should apply, applicant eligibility and evaluation criteria, the types of funding available, and project specifics to be included in application submissions. The evaluation and scoring process of applications is explained followed by the…
Project: Ways to Improve Education in Desegregated Schools (WIEDS). [Appendices for Final Report.
ERIC Educational Resources Information Center
Roberson, Don R.; And Others
This document consists of a literature review and the description of a field study undertaken as part of a pilot research project focusing on improving education in desegregated public schools. The review documents the organization and successful programmatic strategies of school integration. Findings are presented in terms of administrative and…
ERIC Educational Resources Information Center
Steinberg, Matthew P.; Sartain, Lauren
2015-01-01
Chicago Public Schools initiated the Excellence in Teaching Project, a teacher evaluation program designed to increase student learning by improving classroom instruction through structured principal-teacher dialogue. The pilot began in forty-four elementary schools in 2008-09 (cohort 1) and scaled up to include an additional forty-eight…
Recommended Feeding and Dietary Practices To Improve Infant and Maternal Nutrition.
ERIC Educational Resources Information Center
Academy for Educational Development, Washington, DC.
The LINKAGES Project is intended to improve breastfeeding and related complementary feeding and maternal dietary practices. The project, in consultation with technical experts and program managers, identified a set of recommended feeding and dietary practices intended to break the cycle of poor health and nutrition that passes from generation to…
ERIC Educational Resources Information Center
Brown, Chris; Taylor, Carol; Ponambalum, Lorna
2016-01-01
The Haverstock Primary to Secondary Transition Project was designed to improve the experience of transition to secondary school for vulnerable pupils in Camden (London). The project used lesson study to help primary and secondary practitioners work collaboratively, to develop effective cross-phase pedagogical approaches to teaching…
ERIC Educational Resources Information Center
Jao, Limin; McDougall, Doug
2016-01-01
The Collaborative Teacher Inquiry Project was a professional development initiative that sought to improve the teaching and learning of Grade 9 Applied mathematics by encouraging teachers to work collaboratively. The project brought together Grade 9 Applied mathematics teachers from 11 schools across four neighboring public school boards in the…
Fund for the Improvement of Postsecondary Education Project Descriptions.
ERIC Educational Resources Information Center
Fund for the Improvement of Postsecondary Education (ED), Washington, DC.
Descriptions of 155 programs supported by the Fund for the Improvement of Postsecondary Education are provided. In addition to a brief statement of the scope of each program, the project director, address, and phone number are identified. Topics addressed by the programs include: ensuring adequate math preparation for college work through…
The Use of the Software MATLAB To Improve Chemical Engineering Education.
ERIC Educational Resources Information Center
Damatto, T.; Maegava, L. M.; Filho, R. Maciel
In all the Brazilian Universities involved with the project "Prodenge-Reenge", the main objective is to improve teaching and learning procedures for the engineering disciplines. The Chemical Engineering College of Campinas State University focused its effort on the use of engineering softwares. The work developed by this project has…
Online Professional Development for Project Based Learning: Pathways to Systematic Improvement
ERIC Educational Resources Information Center
Ravitz, Jason; Mergendoller, John; Markham, Thom; Thorsen, Carolyn; Rice, Kerry; Snelson, Chareen; Reberry, Sherawn
2004-01-01
This paper describes efforts to increase the prevalence, rigor and relevance of Project Based Learning in US schools and internationally. Under a grant from the Fund for the Improvement of Post Secondary Education (FIPSE), US Department of Education, the Buck Institute for Education and partners are offering: 1) an online staff development…
A Tutorial Guide about How to Manage a Client-Financed Project
ERIC Educational Resources Information Center
Clark, Gary L.; King, Michael E.; Jurn, Iksu
2012-01-01
Today's marketing instructors are faced with the challenge of improving their students' soft skills to prepare them for today's business environment. Numerous authors have noted that client-based/-sponsored projects help students improve the soft skills they need to succeed in the business community. This article provides detailed guidelines on…
2010-04-29
Technology: From the Office Larry Smith Software Technology Support Center to the Enterprise 517 SMXS/MXDEA 6022 Fir Avenue Hill AFB, UT 84056 801...2010 to 00-00-2010 4. TITLE AND SUBTITLE Accelerating Project and Process Improvement using Advanced Software Simulation Technology: From the Office to
DOT National Transportation Integrated Search
2005-07-01
The Iowa Department of Transportation (Iowa DOT), Nebraska Department of Roads : (NDOR), and the Federal Highway Administration (FHWA) are proposing improvements : to the interstate system in the Omaha/Council Bluffs metropolitan area, extending acro...
Vertical Whiteboarding: Riding the Wave of Student Activity in a Mathematics Classroom
ERIC Educational Resources Information Center
Forrester, Tricia; Sandison, Carolyn E.; Denny, Sue
2017-01-01
In 2014 we commenced working on the Inspiring Mathematics and Science in Teacher Education (IMSITE) project, aimed at improving mathematics and science education in Australia by improving the recruitment, development, and retention of mathematics and science teachers. In this project we undertook a range of activities, the most exciting of which…
Quality Matters™: An Educational Input in an Ongoing Design-Based Research Project
ERIC Educational Resources Information Center
Adair, Deborah; Shattuck, Kay
2015-01-01
Quality Matters (QM) has been transforming established best practices and online education-based research into an applicable, scalable course level improvement process for the last decade. In this article, the authors describe QM as an ongoing design-based research project and an educational input for improving online education.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Webster, Mort D.
This report presents the final outcomes and products of the project as performed both at the Massachusetts Institute of Technology and subsequently at Pennsylvania State University. The research project can be divided into three main components: methodology development for decision-making under uncertainty, improving the resolution of the electricity sector to improve integrated assessment, and application of these methods to integrated assessment.
Oncology nurses and the experience of participation in an evidence-based practice project.
Fridman, Mary; Frederickson, Keville
2014-07-01
To illuminate the experiences of oncology nurses who participated in an evidence-based practice (EBP) project in an institution with an EBP organizational structure. A descriptive phenomenologic approach and in-depth interviews with each participant. An oncology-focused academic medical center with an established organizational infrastructure for EBP. 12 RNs working in an oncology setting who participated in an EBP project. Descriptive, qualitative phenomenologic approach through use of interviews and analysis of interview text. Four essential themes (i.e., support, challenges, evolution, and empowerment) and 11 subthemes emerged that reflected nurses' professional and personal growth, as well as the creation of a culture of EBP in the workplace. The participants described the EBP project as a positive, empowering personal and professional evolutionary experience with supports and challenges that resulted in improvements in patient care. To the authors' knowledge, the current study is the first qualitative study to demonstrate improved nursing outcomes (e.g., professional growth, improved nursing performance) and nurses' perception of improved patient outcomes (e.g., ongoing healthcare collaboration, evidence-based changes in practice).
Managing risks in the project pipeline.
DOT National Transportation Integrated Search
2013-08-01
This research focuses on how to manage the risks of project costs and revenue uncertainties over the long-term, and identifies significant : process improvements to ensure projects are delivered on time and as intended, thus maximizing the miles pave...
Strategies for improving transportation project delivery performance.
DOT National Transportation Integrated Search
2016-09-01
project delivery performance for the various contracting methods that are : applicable for CTDOTs use. The report is structured in two parts. Part A covers overall : project deliverability and Part B is focused on environmental review processes an...
Re-evaluation of Montana's air quality program.
DOT National Transportation Integrated Search
2013-08-01
This project examined the Montana DOTs current methods for determining projects for the Montana Air and Congestion Initiative (MACI) program, and made recommendations to improve and implement this program. A major project objective was to keep the...
A Project Management Approach to an ACPE Accreditation Self-study
Iwanowicz, Susan L.; Bailie, George R.; Clarke, David W.; McGraw, Patrick S.
2007-01-01
In preparation for an on-site evaluation and accreditation by the American Council on Pharmaceutical Education (ACPE), the Albany College of Pharmacy employed project management techniques to complete a comprehensive self-study. A project lifecycle approach, including planning, production, and turnover phases, was used by the project's Self-Study Steering Committee. This approach, with minimal disruption to college operations, resulted in the completion of the self-study process on schedule. Throughout the project, the Steering Committee maintained a log of functions that either were executed successfully or in hindsight, could have been improved. To assess the effectiveness of the project management approach to the the self-study process, feedback was obtained from the College community through a poststudy survey. This feedback, coupled with the Steering Committee's data on possible improvements, form the basis for the lessons learned during this self-study process. PMID:17533432
A project management approach to an ACPE accreditation self-study.
Dominelli, Angela; Iwanowicz, Susan L; Bailie, George R; Clarke, David W; McGraw, Patrick S
2007-04-15
In preparation for an on-site evaluation and accreditation by the American Council on Pharmaceutical Education (ACPE), the Albany College of Pharmacy employed project management techniques to complete a comprehensive self-study. A project lifecycle approach, including planning, production, and turnover phases, was used by the project's Self-Study Steering Committee. This approach, with minimal disruption to college operations, resulted in the completion of the self-study process on schedule. Throughout the project, the Steering Committee maintained a log of functions that either were executed successfully or in hindsight, could have been improved. To assess the effectiveness of the project management approach to the the self-study process, feedback was obtained from the College community through a poststudy survey. This feedback, coupled with the Steering Committee's data on possible improvements, form the basis for the lessons learned during this self-study process.
Ma, Deqiang; Zhang, Liyu; Fang, Qinhua; Jiang, Yuwu; Elliott, Michael
2017-05-15
Large scale coastal land-claim and sea-enclosing (CLASE) activities have caused habitat destruction, biodiversity losses and water deterioration, thus the local governments in China have recently undertaken seabed dredging and dyke opening (SDADO) as typical ecological restoration projects. However, some projects focus on a single impact on hydrodynamic conditions, water quality or marine organisms. In a case study in Xiamen, China, an integrated effects assessment framework centres on ecohydrology, using modeling of hydrodynamic conditions and statistical analysis of water quality, was developed to assess the effects of ecological restoration projects. The benefits of SDADO projects include improving hydrodynamic conditions and water quality, as a precursor to further marine biological improvements. This study highlights the need to comprehensively consider ecological effects of SDADO projects in the planning stage, and an integrative assessment method combining cumulative effects of hydrodynamic conditions, water quality and biological factors. Copyright © 2017 Elsevier Ltd. All rights reserved.
NASA Astrophysics Data System (ADS)
Chowdhury, Tamara
2013-08-01
Senior design courses are a core part of curricula across engineering and technology disciplines. Such courses offer Construction Management (CMG) students the opportunity to bring together, assimilate and apply the knowledge they have acquired over their entire undergraduate academic programme to an applied technical project. Senior or Capstone design course engages students in a real-world project, enhance leadership development, and prepare to manage and lead project teams. The CMG programme's multidisciplinary approach at Alabama A&M University, combines essential components of construction techniques with concepts of business management to develop technically qualified individuals for responsible management roles in the design, construction and operation of major construction projects. This paper analyses the performance of the students and improvement due to the interaction with the faculty advisors and industrial panel during the two semester Capstone project. The results of this Capstone sequence have shown a continuous improvement of student performance.
Shewade, Hemant Deepak; Kyaw, Nang Thu Thu; Thein, Saw; Si Thu, Aung; Kyaw, Khine Wut Yee; Aye, Nyein Nyein; Phyo, Aye Mon; Maung, Htet Myet Win; Soe, Kyaw Thu; Aung, Si Thu
2018-01-01
Background The Union in collaboration with national TB programme (NTP) started the community-based MDR-TB care (CBMDR-TBC) project in 33 townships of upper Myanmar to improve treatment initiation and treatment adherence. Patients with MDR-TB diagnosed/registered under NTP received support through the project staff, in addition to the routine domiciliary care provided by NTP staff. Each township had a project nurse exclusively for MDR-TB and 30 USD per month (max. for 4 months) were provided to the patient as a pre-treatment support. Objectives To assess whether CBMDR-TBC project’s support improved treatment initiation. Methods In this cohort study (involving record review) of all diagnosed MDR-TB between January 2015 and June 2016 in project townships, CBMDR-TBC status was categorized as “receiving support” if date of project initiation in patient’s township was before the date of diagnosis and “not receiving support”, if otherwise. Cox proportional hazards regression (censored on 31 Dec 2016) was done to identify predictors of treatment initiation. Results Of 456 patients, 57% initiated treatment: 64% and 56% among patients “receiving support (n = 208)” and “not receiving support (n = 228)” respectively (CBMDR-TBC status was not known in 20 (4%) patients due to missing diagnosis dates). Among those initiated on treatment (n = 261), median (IQR) time to initiate treatment was 38 (20, 76) days: 31 (18, 50) among patients “receiving support” and 50 (26,101) among patients “not receiving support”. After adjusting other potential confounders (age, sex, region, HIV, past history of TB treatment), patients “receiving support” had 80% higher chance of initiating treatment [aHR (0.95 CI): 1.8 (1.3, 2.3)] when compared to patients “not receiving support”. In addition, age 15–54 years, previous history of TB and being HIV negative were independent predictors of treatment initiation. Conclusion Receiving support under CBMDR-TBC project improved treatment initiation: it not only improved the proportion initiated but also reduced time to treatment initiation. We also recommend improved tracking of all diagnosed patients as early as possible. PMID:29596434
Overview of the Integrated Programs for Aerospace Vehicle Design (IPAD) project
NASA Technical Reports Server (NTRS)
Venneri, S. L.
1983-01-01
To respond to national needs for improved productivity in engineering design and manufacturing, a NASA supported joint industry/government project is underway denoted Integrated Programs for Aerospace Vehicle Design (IPAD). The objective is to improve engineering productivity through better use of computer technology. It focuses on development of data base management technology and associated software for integrated company wide management of engineering and manufacturing information. Results to date on the IPAD project include an in depth documentation of a representative design process for a large engineering project, the definition and design of computer aided design software needed to support that process, and the release of prototype software to manage engineering information. This paper provides an overview of the IPAD project and summarizes progress to date and future plans.
Rauschenbach, Ines; Keddis, Ramaydalis; Davis, Diane
2018-01-01
We have redesigned a tried-and-true laboratory exercise into an inquiry-based team activity exploring microbial growth control, and implemented this activity as the basis for preparing a scientific poster in a large, multi-section laboratory course. Spanning most of the semester, this project culminates in a poster presentation of data generated from a student-designed experiment. Students use and apply the scientific method and improve written and verbal communication skills. The guided inquiry format of this exercise provides the opportunity for student collaboration through cooperative learning. For each learning objective, a percentage score was tabulated (learning objective score = points awarded/total possible points). A score of 80% was our benchmark for achieving each objective. At least 76% of the student groups participating in this project over two semesters achieved each learning goal. Student perceptions of the project were evaluated using a survey. Nearly 90% of participating students felt they had learned a great deal in the areas of formulating a hypothesis, experimental design, and collecting and analyzing data; 72% of students felt this project had improved their scientific writing skills. In a separate survey, 84% of students who responded felt that peer review was valuable in improving their final poster submission. We designed this inquiry-based poster project to improve student scientific communication skills. This exercise is appropriate for any microbiology laboratory course whose learning outcomes include the development of scientific inquiry and literacy.
Rauschenbach, Ines; Keddis, Ramaydalis; Davis, Diane
2018-01-01
We have redesigned a tried-and-true laboratory exercise into an inquiry-based team activity exploring microbial growth control, and implemented this activity as the basis for preparing a scientific poster in a large, multi-section laboratory course. Spanning most of the semester, this project culminates in a poster presentation of data generated from a student-designed experiment. Students use and apply the scientific method and improve written and verbal communication skills. The guided inquiry format of this exercise provides the opportunity for student collaboration through cooperative learning. For each learning objective, a percentage score was tabulated (learning objective score = points awarded/total possible points). A score of 80% was our benchmark for achieving each objective. At least 76% of the student groups participating in this project over two semesters achieved each learning goal. Student perceptions of the project were evaluated using a survey. Nearly 90% of participating students felt they had learned a great deal in the areas of formulating a hypothesis, experimental design, and collecting and analyzing data; 72% of students felt this project had improved their scientific writing skills. In a separate survey, 84% of students who responded felt that peer review was valuable in improving their final poster submission. We designed this inquiry-based poster project to improve student scientific communication skills. This exercise is appropriate for any microbiology laboratory course whose learning outcomes include the development of scientific inquiry and literacy. PMID:29904518
Ridde, Valéry; Nitièma, Abdoulaye P; Dadjoari, Moussa
2005-01-01
Despite the formulation of the Bamako initiative in 1992 in Burkina Faso, not until 2001 and the launching of a project by a nongovernmental organization was the policy really implemented in a region of the country. One of the goals of this policy is to improve access to health care by using generic essential drugs. The objective of this article is to summarize the results of the evaluation of the project's ability to improve the population's access to drugs. The project lasted three years (2001-2003) and the interventions took place in 41 basic health centres of three districts. According to WHO, improving access to drugs requires consideration of four essential factors: rational use, affordable prices, financial viability, and effectiveness of the distribution. The average number of drugs prescribed per prescription sheet (n = 1061) was 2.4; 93% of the drugs were prescribed by their generic name (international non-proprietary names); 44% of infant diarrheas were treated with oral rehydration salt. National drug prices were respected but not the directives aiming at exempting from payment or subsidizing certain population sub-groups (children, indigents). The average annual cash flow of the basic health centres was 1.2 million F CFA and it increased by 854% compared to the beginning of the project. The cost-recovery scheme for administrative expenses was 106%. The average annual availability of the 10 essential drugs was 89%. Utilization rates increased (0.13 in 1999 to 0.21 in 2003) but not significantly differently than in other basic health centres of the area not supported by the project (p = 0.084). The project succeeded in improving access to these drugs for the overall population but not for the worst-off. The drugs are now geographically available for all and financially accessible for those who can afford to pay. The intervention strategy supported the sustainability of the project's activities but much remains to be done to provide the poorest with access to drugs.
Occupational health and the environment in an urban slum in India.
Shukla, A; Kumar, S; Ory, F G
1991-01-01
The Indo-Dutch Environmental & Sanitary Engineering Project under the Ganga action Plan in Kanpur and Mirzapur is being executed within the Indo-Dutch bilateral development cooperation framework. The project aims to integrate physical, social and health related improvements. It is expected that the development approach and methodology can be replicated in other urban settlements in India. The project is being supplemented by a training and institutional strengthening programme to facilitate the transfer of new technologies and improvement of operation and maintenance of the new facilities. The project is also aimed at the improvement of the living conditions of the population, by installing drinking water and drainage systems. A socio-economic unit in the project supports the technical interventions by enhancing the community to participate in project activities. The Occupational Health Programme in Jajmau, an industrial slum of Kanpur, aims to improve the working conditions of tannery workers. Four hundred and ninety-seven tannery workers and 80 employees not engaged in leather work, from 20 tanneries, were interviewed and underwent physical examination. The mean age of tannery workers was 32 years, about half of them recently migrated to Kanpur. The majority of the workers are illiterate, have temporary jobs and 85% have a monthly income between 300 and 600 Rs. Occupational morbidity was 28.2%. Regular meetings with tannery owners, the training of tannery workers in first aid, and support for the installation of safety and health councils in tanneries are the main programme activities.(ABSTRACT TRUNCATED AT 250 WORDS)
Management of the Atmosphere Resource Recovery and Environmental Monitoring Project
NASA Technical Reports Server (NTRS)
Roman, Monsi; Perry, Jay; Howard, David
2013-01-01
The Advanced Exploration Systems Program's Atmosphere Resource Recovery and Environmental Monitoring (ARREM) project is working to further optimize atmosphere revitalization and environmental monitoring system architectures. This paper discusses project management strategies that tap into skill sets across multiple engineering disciplines, projects, field centers, and industry to achieve the project success. It is the project's objective to contribute to system advances that will enable sustained exploration missions beyond Lower Earth Orbit (LEO) and improve affordability by focusing on the primary goals of achieving high reliability, improving efficiency, and reducing dependence on ground-based logistics resupply. Technology demonstrations are achieved by infusing new technologies and concepts with existing developmental hardware and operating in a controlled environment simulating various crewed habitat scenarios. The ARREM project's strengths include access to a vast array of existing developmental hardware that perform all the vital atmosphere revitalization functions, exceptional test facilities to fully evaluate system performance, and a well-coordinated partnering effort among the NASA field centers and industry partners to provide the innovative expertise necessary to succeed.
McCabe, Louise; Greasley-Adams, Corinne; Goodson, Katy
2015-11-01
This paper presents the findings from an evaluation of a creative musical project led by Scottish Opera. The project included people with dementia and their carers in the development, writing, design and performance of a musical production about their experiences of love. The project involved professional singers, artists and choreographers from the opera company. Activities involved practice sessions and performances. People with dementia and their carers reflected on positive outcomes from the project including improved confidence; being part of a group; improved physical strength and people seeing them in a new way. Within the evaluation framework they also reported on how the project had been run and gave ideas for future development. Key elements in the success of this project were the involvement of professionals, the kudos of working with a national organisation and the performances that, while daunting, provided unique and rewarding experiences. © The Author(s) 2013.
Arora, Sanjeev; Thornton, Karla; Jenkusky, Steven M; Parish, Brooke; Scaletti, Joseph V
2007-01-01
Project Extension for Community Healthcare Outcomes (Project ECHO) is a telemedicine and distance-learning program designed to improve access to quality health care for New Mexicans with hepatitis C. Project ECHO links health-care providers from rural clinics, the Indian Health Service, and prisons with specialists at the University of New Mexico. At weekly clinics, partners present and discuss patients with hepatitis C with specialists. Partners can receive continuing education credits for participating. Since June 2003, 173 hepatitis C clinics have been conducted with 1,843 case presentations. Partners have received 390 hours of training and 2,997 hours of continuing education credits. And in 2006, the State Legislature approved $1.5 million in annual funding for the project. Project ECHO has increased access to state-of-the art hepatitis C virus care for patients living in rural areas or prisons. Because of its success with hepatitis C, this project is being expanded to other chronic medical conditions.
Improve services project -- Republic of the Marshall Islands.
Langidrik, J
1995-01-01
The Republic of the Marshall Islands has 60 dispensary sites, each staffed by 1 health assistant, to cover 80-800 people/site on 34 atolls. Until the spring of 1994, only curative services were available on a regular basis, and preventive services were provided by traveling health teams from the urban centers. In 1994, the health assistants in selected outer islands were trained to administer immunizations from vaccines which are sent regularly by air. Additional project sites are being selected. In 1993, 2 dispensaries initiated a project to 1) increase the number of women with access to prenatal care during the first trimester, 2) increase immunization levels, 3) improve access to preventive services, and 4) improve reporting and record-keeping systems. This project includes an important training component for the health assistant, the wife of the health assistant, the traditional birth attendant, the youth peer educator, community leaders, and a member of the local council. By 1994, this project was expanded to 13 dispensaries on 2 atolls. In 1995, 18 more dispensaries on 4 more atolls will be able to offer these additional services.
Distributed Wind Competitiveness Improvement Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
The Competitiveness Improvement Project (CIP) is a periodic solicitation through the U.S. Department of Energy and its National Renewable Energy Laboratory. The Competitiveness Improvement Project (CIP) is a periodic solicitation through the U.S. Department of Energy and its National Renewable Energy Laboratory. Manufacturers of small and medium wind turbines are awarded cost-shared grants via a competitive process to optimize their designs, develop advanced manufacturing processes, and perform turbine testing. The goals of the CIP are to make wind energy cost competitive with other distributed generation technology and increase the number of wind turbine designs certified to national testing standards. Thismore » fact sheet describes the CIP and funding awarded as part of the project.ufacturers of small and medium wind turbines are awarded cost-shared grants via a competitive process to optimize their designs, develop advanced manufacturing processes, and perform turbine testing. The goals of the CIP are to make wind energy cost competitive with other distributed generation technology and increase the number of wind turbine designs certified to national testing standards. This fact sheet describes the CIP and funding awarded as part of the project.« less
EMPRESS: A European Project to Enhance Process Control Through Improved Temperature Measurement
NASA Astrophysics Data System (ADS)
Pearce, J. V.; Edler, F.; Elliott, C. J.; Rosso, L.; Sutton, G.; Andreu, A.; Machin, G.
2017-08-01
A new European project called EMPRESS, funded by the EURAMET program `European Metrology Program for Innovation and Research,' is described. The 3 year project, which started in the summer of 2015, is intended to substantially augment the efficiency of high-value manufacturing processes by improving temperature measurement techniques at the point of use. The project consortium has 18 partners and 5 external collaborators, from the metrology sector, high-value manufacturing, sensor manufacturing, and academia. Accurate control of temperature is key to ensuring process efficiency and product consistency and is often not achieved to the level required for modern processes. Enhanced efficiency of processes may take several forms including reduced product rejection/waste; improved energy efficiency; increased intervals between sensor recalibration/maintenance; and increased sensor reliability, i.e., reduced amount of operator intervention. Traceability of temperature measurements to the International Temperature Scale of 1990 (ITS-90) is a critical factor in establishing low measurement uncertainty and reproducible, consistent process control. Introducing such traceability in situ (i.e., within the industrial process) is a theme running through this project.
Improving Neural Recording Technology at the Nanoscale
NASA Astrophysics Data System (ADS)
Ferguson, John Eric
Neural recording electrodes are widely used to study normal brain function (e.g., learning, memory, and sensation) and abnormal brain function (e.g., epilepsy, addiction, and depression) and to interface with the nervous system for neuroprosthetics. With a deep understanding of the electrode interface at the nanoscale and the use of novel nanofabrication processes, neural recording electrodes can be designed that surpass previous limits and enable new applications. In this thesis, I will discuss three projects. In the first project, we created an ultralow-impedance electrode coating by controlling the nanoscale texture of electrode surfaces. In the second project, we developed a novel nanowire electrode for long-term intracellular recordings. In the third project, we created a means of wirelessly communicating with ultra-miniature, implantable neural recording devices. The techniques developed for these projects offer significant improvements in the quality of neural recordings. They can also open the door to new types of experiments and medical devices, which can lead to a better understanding of the brain and can enable novel and improved tools for clinical applications.
NASA Astrophysics Data System (ADS)
Olson, J.; Kenyon, J.; Brown, J. M.; Angevine, W. M.; Marquis, M.; Pichugina, Y. L.; Choukulkar, A.; Bonin, T.; Banta, R. M.; Bianco, L.; Djalalova, I.; McCaffrey, K.; Wilczak, J. M.; Lantz, K. O.; Long, C. N.; Redfern, S.; McCaa, J. R.; Stoelinga, M.; Grimit, E.; Cline, J.; Shaw, W. J.; Lundquist, J. K.; Lundquist, K. A.; Kosovic, B.; Berg, L. K.; Kotamarthi, V. R.; Sharp, J.; Jiménez, P.
2017-12-01
The Rapid Refresh (RAP) and High-Resolution Rapid Refresh (HRRR) are NOAA real-time operational hourly updating forecast systems run at 13- and 3-km grid spacing, respectively. Both systems use the Advanced Research version of the Weather Research and Forecasting (WRF-ARW) as the model component of the forecast system. During the second installment of the Wind Forecast Improvement Project (WFIP 2), the RAP/HRRR have been targeted for the improvement of low-level wind forecasts in the complex terrain within the Columbia River Basin (CRB), which requires much finer grid spacing to resolve important terrain peaks in the Cascade Mountains as well as the Columbia River Gorge. Therefore, this project provides a unique opportunity to test and develop the RAP/HRRR physics suite within a very high-resolution nest (Δx = 750 m) over the northwestern US. Special effort is made to incorporate scale-aware aspects into the model physical parameterizations to improve RAP/HRRR wind forecasts for any application at any grid spacing. Many wind profiling and scanning instruments have been deployed in the CRB in support the WFIP 2 field project, which spanned 01 October 2015 to 31 March 2017. During the project, several forecast error modes were identified, such as: (1) too-shallow cold pools during the cool season, which can mix-out more frequently than observed and (2) the low wind speed bias in thermal trough-induced gap flows during the warm season. Development has been focused on the column-based turbulent mixing scheme to improve upon these biases, but investigating the effects of horizontal (and 3D) mixing has also helped improve some of the common forecast failure modes. This presentation will highlight the testing and development of various model components, showing the improvements over original versions for temperature and wind profiles. Examples of case studies and retrospective periods will be presented to illustrate the improvements. We will demonstrate that the improvements made in WFIP 2 will be extendable to other regions, complex or flat terrain. Ongoing and future challenges in RAP/HRRR physics development will be touched upon.
Akins, Ralitsa B.; Handal, Gilbert A.
2009-01-01
Objective Although there is an expectation for outcomes-oriented training in residency programs, the reality is that few guidelines and examples exist as to how to provide this type of education and training. We aimed to improve patient care outcomes in our pediatric residency program by using quality improvement (QI) methods, tools, and approaches. Methods A series of QI projects were implemented over a 3-year period in a pediatric residency program to improve patient care outcomes and teach the residents how to use QI methods, tools, and approaches. Residents experienced practice-based learning and systems-based assessment through group projects and review of their own patient outcomes. Resident QI experiences were reviewed quarterly by the program director and were a mandatory part of resident training portfolios. Results Using QI methodology, we were able to improve management of children with obesity, to achieve high compliance with the national patient safety goals, improve the pediatric hotline service, and implement better patient flow in resident continuity clinic. Conclusion Based on our experiences, we conclude that to successfully implement QI projects in residency programs, QI techniques must be formally taught, the opportunities for resident participation must be multiple and diverse, and QI outcomes should be incorporated in resident training and assessment so that they experience the benefits of the QI intervention. The lessons learned from our experiences, as well as the projects we describe, can be easily deployed and implemented in other residency programs. PMID:21975995
Firefighters Integrated Response Equipment System
NASA Technical Reports Server (NTRS)
Kaplan, H.; Abeles, F.
1978-01-01
The Firefighters Integrated Response Equipment System (Project FIRES) is a joint National Fire Prevention and Control Administration (NFPCA)/National Aeronautics and Space Administration (NASA) program for the development of an 'ultimate' firefighter's protective ensemble. The overall aim of Project FIRES is to improve firefighter protection against hazards, such as heat, flame, smoke, toxic fumes, moisture, impact penetration, and electricity and, at the same time, improve firefighter performance by increasing maneuverability, lowering weight, and improving human engineering design of his protective ensemble.
Snijder, Mieke; Shakeshaft, Anthony; Wagemakers, Annemarie; Stephens, Anne; Calabria, Bianca
2015-11-21
Community development is a health promotion approach identified as having great potential to improve Indigenous health, because of its potential for extensive community participation. There has been no systematic examination of the extent of community participation in community development projects and little analysis of their effectiveness. This systematic review aims to identify the extent of community participation in community development projects implemented in Australian Indigenous communities, critically appraise the qualitative and quantitative methods used in their evaluation, and summarise their outcomes. Ten electronic peer-reviewed databases and two electronic grey literature databases were searched for relevant studies published between 1990 and 2015. The level of community participation and the methodological quality of the qualitative and quantitative components of the studies were assessed against standardised criteria. Thirty one evaluation studies of community development projects were identified. Community participation varied between different phases of project development, generally high during project implementation, but low during the evaluation phase. For the majority of studies, methodological quality was low and the methods were poorly described. Although positive qualitative or quantitative outcomes were reported in all studies, only two studies reported statistically significant outcomes. Partnerships between researchers, community members and service providers have great potential to improve methodological quality and community participation when research skills and community knowledge are integrated to design, implement and evaluate community development projects. The methodological quality of studies evaluating Australian Indigenous community development projects is currently too weak to confidently determine the cost-effectiveness of community development projects in improving the health and wellbeing of Indigenous Australians. Higher quality studies evaluating community development projects would strengthen the evidence base.
Reich, Stephanie M; Kay, Joseph S; Lin, Grace C
2015-01-01
Community-based participatory research is predicated on building partnerships that tackle important issues to the community and effectively improve these issues. Community-based participatory research can also be an empowering experience, especially for children. This article describes a university-community partnership in which students at a low-income middle school worked to improve the quality of the cafeteria food provided to the 986 students eligible for free and reduced price lunches. The project led to menu changes, improved communication between youth, school administrators, and district staff, and enabled youth to enact school improvements that were beneficial for their health.
Developing a Performance Data Suite to Facilitate Lean Improvement in a Chemotherapy Day Unit
Lingaratnam, Senthil; Murray, Danielle; Carle, Amber; Kirsa, Sue W.; Paterson, Rebecca; Rischin, Danny
2013-01-01
Purpose: A multidisciplinary team from the Peter MacCallum Cancer Centre in Melbourne, Australia, developed a performance data suite to support a service improvement project based on lean manufacturing principles in its 19-chair chemotherapy day unit (CDU) and cytosuite chemotherapy production facility. The aims of the project were to reduce patient wait time and improve equity of access to the CDU. Methods: A project team consisting of a pharmacist and CDU nurse supported the management team for 10 months in engaging staff and customers to identify waste in processes, analyze root causes, eliminate non–value-adding steps, reduce variation, and level workloads to improve quality and flow. Process mapping, staff and patient tracking and opinion surveys, medical record audits, and interrogation of electronic treatment records were undertaken. Results: This project delivered a 38% reduction in median wait time on the day (from 32 to 20 minutes; P < .01), 7-day reduction in time to commencement of treatment for patients receiving combined chemoradiotherapy regimens (from 25 to 18 days; P < .01), and 22% reduction in wastage associated with expired drug and pharmacy rework (from 29% to 7%; P < .01). Improvements in efficiency enabled the cytosuite to increase the percentage of product manufactured within 10 minutes of appointment times by 29% (from 47% to 76%; P < .01). Conclusion: A lean improvement methodology provided a robust framework for improved understanding and management of complex system constraints within a CDU, resulting in improved access to treatment and reduced waiting times on the day. PMID:23942927
Teaching residents about practice-based learning and improvement.
Morrison, Laura J; Headrick, Linda A
2008-08-01
The Accreditation Council for Graduate Medical Education has endorsed practice-based learning and improvement (PBLI) as a core competency for residents. Health professions educators have sought since the early 1990s to incorporate quality improvement principles, methods, and skills into training programs. A literature review indicates that questions remain regarding how to best train physicians to lead the improvement of patient care. The efficacy of two PBLI educational interventions was examined by comparing the performance of participating residents with that of controls. Personal improvement projects (PIPs) and a workshop were implemented to teach PBLI to internal medicine residents. Residents in an ambulatory block rotation were required to complete a PIP. All residents were invited to attend the workshop. Those participating in neither served as controls. An instrument was used to assess applied improvement knowledge for PIP participants at project completion and all residents six to eight months later. Analysis of variance showed no difference between the performance of PIP participants at project completion and PIP participants and controls six to eight months later. A second analysis compared six- to eight-month follow-up data for residents doing PIP only, workshop only, both PIP and workshop, and controls. No significant differences were detected among groups. Interrater reliability for the tool was good. No difference was found between intervention residents and controls in the assessment of their ability to apply improvement knowledge. This suggests that workshops and PIPs alone will not lead to competence in PBLI. Building this competency likely will require more emphasis on experiential learning and resident participation in health care improvement projects.
Perry, Henry B; Rassekh, Bahie M; Gupta, Sundeep; Freeman, Paul A
2017-01-01
Background There is limited evidence about the long–term effectiveness of integrated community–based primary health care (CBPHC) in improving maternal, neonatal and child health. However, the interventions implemented and the approaches used by projects with such evidence can provide guidance for ending preventable child and maternal deaths by the year 2030. Methods A database of 700 assessments of the effectiveness of CBPHC in improving maternal, neonatal and child health has been assembled, as described elsewhere in this series. A search was undertaken of these assessments of research studies, field project and programs (hereafter referred to as projects) with more than a single intervention that had evidence of mortality impact for a period of at least 10 years. Four projects qualified for this analysis: the Matlab Maternal Child Health and Family Planning (MCH–FP) P in Bangladesh; the Hôpital Albert Schweitzer in Deschapelles, Haiti; the Comprehensive Rural Health Project (CRHP) in Jamkhed, India; and the Society for Education, Action and Research in Community Health (SEARCH) in Gadchiroli, India. Results These four projects have all been operating for more than 30 years, and they all have demonstrated reductions in infant mortality, 1– to 4–year mortality, or under–5 mortality for at least 10 years. They share a number of characteristics. Among the most notable of these are: they provide comprehensive maternal, child health and family planning services, they have strong community–based programs that utilize community health workers who maintain regular contact with all households, they have develop strong collaborations with the communities they serve, and they all have strong referral capabilities and provide first–level hospital care. Conclusions The shared features of these projects provide guidance for how health systems around the world might improve their effectiveness in improving maternal, neonatal and child health. Strengthening these features will contribute to achieving the goal of ending preventable child and maternal deaths by the year 2030. PMID:28685045
Perry, Henry B; Rassekh, Bahie M; Gupta, Sundeep; Freeman, Paul A
2017-06-01
There is limited evidence about the long-term effectiveness of integrated community-based primary health care (CBPHC) in improving maternal, neonatal and child health. However, the interventions implemented and the approaches used by projects with such evidence can provide guidance for ending preventable child and maternal deaths by the year 2030. A database of 700 assessments of the effectiveness of CBPHC in improving maternal, neonatal and child health has been assembled, as described elsewhere in this series. A search was undertaken of these assessments of research studies, field project and programs (hereafter referred to as projects) with more than a single intervention that had evidence of mortality impact for a period of at least 10 years. Four projects qualified for this analysis: the Matlab Maternal Child Health and Family Planning (MCH-FP) P in Bangladesh; the Hôpital Albert Schweitzer in Deschapelles, Haiti; the Comprehensive Rural Health Project (CRHP) in Jamkhed, India; and the Society for Education, Action and Research in Community Health (SEARCH) in Gadchiroli, India. These four projects have all been operating for more than 30 years, and they all have demonstrated reductions in infant mortality, 1- to 4-year mortality, or under-5 mortality for at least 10 years. They share a number of characteristics. Among the most notable of these are: they provide comprehensive maternal, child health and family planning services, they have strong community-based programs that utilize community health workers who maintain regular contact with all households, they have develop strong collaborations with the communities they serve, and they all have strong referral capabilities and provide first-level hospital care. The shared features of these projects provide guidance for how health systems around the world might improve their effectiveness in improving maternal, neonatal and child health. Strengthening these features will contribute to achieving the goal of ending preventable child and maternal deaths by the year 2030.
Effective and efficient implementation of alternative project delivery : research summary.
DOT National Transportation Integrated Search
2017-05-01
Alternative project delivery (APD) methods such as Design Build (DB) and Construction Manager at Risk (CMAR), are used by state departments of transportation to improve the efficiency and effectiveness of project delivery. The Maryland Department of ...
5 CFR 470.301 - Program expectations.
Code of Federal Regulations, 2013 CFR
2013-01-01
... MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration... improved personnel methods. (b) The demonstration project must be proposed in a research context. The project plan must include a research design which contains: (1) Measurable goals or objectives; (2...
5 CFR 470.301 - Program expectations.
Code of Federal Regulations, 2011 CFR
2011-01-01
... MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration... improved personnel methods. (b) The demonstration project must be proposed in a research context. The project plan must include a research design which contains: (1) Measurable goals or objectives; (2...
5 CFR 470.301 - Program expectations.
Code of Federal Regulations, 2014 CFR
2014-01-01
... MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration... improved personnel methods. (b) The demonstration project must be proposed in a research context. The project plan must include a research design which contains: (1) Measurable goals or objectives; (2...
5 CFR 470.301 - Program expectations.
Code of Federal Regulations, 2012 CFR
2012-01-01
... MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration... improved personnel methods. (b) The demonstration project must be proposed in a research context. The project plan must include a research design which contains: (1) Measurable goals or objectives; (2...
Final Evaluation Report for Minneapolis Health and Nutrition Project.
ERIC Educational Resources Information Center
Guardian Resource Development, Inc., St. Paul, Minn.
The social, mental and physical health of children in target Minneapolis Schools has been carefully studied. The intent of this project was to design and implement a program which would improve health. This report discusses the progress of the project for the first year. The project's activities centered around planning, needs assessment and…
Developing Capacity for Social and Emotional Growth: An Action Research Project
ERIC Educational Resources Information Center
Doveston, Mary
2007-01-01
This article reports an action research project in which children, their teacher and the author, and an advisory teacher from a Local Authority collaborated as co-researchers in a project to improve working relationships in the classroom. Both appreciative enquiry and emancipatory research informed the project. This article focuses on one aspect…
Community Action Projects: Applying Biotechnology in the Real World
ERIC Educational Resources Information Center
Nguyen, Phuong D.; Siegel, Marcelle A.
2015-01-01
Project-based learning and action research are powerful pedagogies in improving science education. We implemented a semester-long course using project-based action research to help students apply biotechnology knowledge learned in the classroom to the real world. Students had several choices to make in the project: working individually or as a…
34 CFR 664.1 - What is the Fulbright-Hays Group Projects Abroad Program?
Code of Federal Regulations, 2010 CFR
2010-07-01
... Group Projects Abroad Program is designed to contribute to the development and improvement of the study... 34 Education 3 2010-07-01 2010-07-01 false What is the Fulbright-Hays Group Projects Abroad... (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION FULBRIGHT-HAYS GROUP PROJECTS ABROAD...
34 CFR 664.1 - What is the Fulbright-Hays Group Projects Abroad Program?
Code of Federal Regulations, 2011 CFR
2011-07-01
... Group Projects Abroad Program is designed to contribute to the development and improvement of the study... 34 Education 3 2011-07-01 2011-07-01 false What is the Fulbright-Hays Group Projects Abroad... (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION FULBRIGHT-HAYS GROUP PROJECTS ABROAD...
34 CFR 664.1 - What is the Fulbright-Hays Group Projects Abroad Program?
Code of Federal Regulations, 2014 CFR
2014-07-01
... Group Projects Abroad Program is designed to contribute to the development and improvement of the study... 34 Education 3 2014-07-01 2014-07-01 false What is the Fulbright-Hays Group Projects Abroad... (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION FULBRIGHT-HAYS GROUP PROJECTS ABROAD...
34 CFR 664.1 - What is the Fulbright-Hays Group Projects Abroad Program?
Code of Federal Regulations, 2012 CFR
2012-07-01
... Group Projects Abroad Program is designed to contribute to the development and improvement of the study... 34 Education 3 2012-07-01 2012-07-01 false What is the Fulbright-Hays Group Projects Abroad... (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION FULBRIGHT-HAYS GROUP PROJECTS ABROAD...
34 CFR 664.1 - What is the Fulbright-Hays Group Projects Abroad Program?
Code of Federal Regulations, 2013 CFR
2013-07-01
... Group Projects Abroad Program is designed to contribute to the development and improvement of the study... 34 Education 3 2013-07-01 2013-07-01 false What is the Fulbright-Hays Group Projects Abroad... (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION FULBRIGHT-HAYS GROUP PROJECTS ABROAD...
Effective Use of Group Projects in Online Learning
ERIC Educational Resources Information Center
Ekblaw, Robert
2016-01-01
Group projects have long been used in face-to-face instruction to improve cognitive learning among its students. Group projects not only provide practical experience and allow students to practice the concepts they have learned, but also teach the students creative construction and group dynamics. As important as group projects have proven in…
How Configuration Management (CM) Can Help Project Teams To Innovate and Communicate
NASA Technical Reports Server (NTRS)
Cioletti, Louis
2009-01-01
Traditionally, CM is relegated to a support role in project management activities. CM s traditional functions of identification, change control, status accounting, and audits/verification are still necessary and play a vital role. However, this presentation proposes CM s role in a new and innovative manner that will significantly improve communication throughout the organization and, in turn, augment the project s success. CM s new role is elevated to the project management level, above the engineering or sub-project level in the Work Breakdown Structure (WBS), where it can more effectively accommodate changes, reduce corrective actions, and ensure that requirements are clear, concise, and valid, and that results conform to the requirements. By elevating CM s role in project management and orchestrating new measures, a new communication will emerge that will improve information integrity, structured baselines, interchangeability/traceability, metrics, conformance to standards, and standardize the best practices in the organization. Overall project performance (schedule, quality, and cost) can be no better than the ability to communicate requirements which, in turn, is no better than the CM process to communicate project decisions and the correct requirements.
Ogunlana, S; Yotsinsak, T; Yisa, S
2001-11-01
Many public and large-scale construction projects in Thailand have been faced with environmental and social conflict problems. The major cause is that project sponsors do not address concerns of the public in a proper manner during EIA study. The Yadana Natural Gas Pipeline (YNGP) project is an example of a project which suffered the effects of public demonstration. A public hearing, one technique of public participation, is a good mechanism to solve conflict problems in a non-violent way which the Thai Government usually adopts to settle conflict in construction projects. In the case of the YNGP, even after the conflict was 'resolved' hostility towards the project was not eliminated, as the opponents were not satisfied with the decision. Therefore, this article examines the hearing on the YNGP project. The study found that it was too late to make any significant changes to the project after the hearing was held, most respondents were not satisfied with the project. In other words, this hearing did not improve their perception of environmental soundness of the project. The study showed that the project's impact on the environment was not properly addressed. The project sponsors did not provide sufficient publicity for the meeting and the stage at which the hearing was conducted. Suggestions are made for improving participation in future hearings.
Kalanithi, Lucy; Coffey, Charles E; Mourad, Michelle; Vidyarthi, Arpana R; Hollander, Harry; Ranji, Sumant R
2013-01-01
This article reports on a resident-led quality improvement program to improve communication between inpatient internal medicine residents and their patients' primary care physicians (PCPs). The program included education on care transitions, standardization of documentation, audit and feedback of documented PCP communication rates with public reporting of performance, rapid-cycle data analysis and improvement projects, and a financial incentive. At baseline, PCP communication was documented in 55% of patients; after implementation of the intervention, communication was documented in 89.3% (2477 of 2772) of discharges during the program period. The program was associated with a significant increase in referring PCP satisfaction with communication at hospital admission (baseline, 27.7% "satisfied" or "very satisfied"; postintervention, 58.2%; P < .01) but not at discharge (baseline, 14.9%; postintervention, 21.8%; P = .41). Residents cited the importance of PCP communication for patient care and audit and feedback of their performance as the principal drivers of their engagement in the project.
Anderson, Loretta; Kynoch, Kathryn
2017-03-01
The aim of this evidence-based practice project was to improve local practice in the treatment of breast engorgement in postnatal mothers and to ensure the treatment of engorgement in postnatal mothers is performed according to the best available evidence. This evidence-based practice project took place in a 28-bed postnatal ward in a large metropolitan tertiary hospital. Twenty midwives and 20 in-patients were recruited for the project. The project utilized an audit and feedback design. Midwives were asked a series of questions to test their knowledge on engorgement, and mothers were asked questions relating to the breastfeeding and engorgement care they received. The project was conducted in three phases: preparation for quality audit, implementation of best practice and postimplementation audit. Comparison of Audit 1 (preimplementation) and Audit 2 (postimplementation) results shows significant improvements in all eight audit criteria. An increase of 80% was achieved for the criteria 'midwives received formal education on engorgement' on completion of the project. A 20% increase in 'consistency of education regarding latch' was reported by the mothers, and there was a 30% increase in 'information given to mothers on prevention and signs of engorgement'. Sixty-five percent of midwives were able to correctly identify and manage engorgement, a significant improvement from 5% at baseline. This evidence-based practice project successfully identified and utilized best practice in the management of breast engorgement care in mothers in our clinical setting. With effective breast engorgement interventions in place, mothers could continue to successfully breastfeed their babies. The major challenges identified during the conduct of the project included: time constraints on the midwives to attend education sessions and to educate mothers on prevention. At the completion of this project, a closer relationship was forged between the lactation consultant team and the midwives in the project setting. This increased the satisfaction and productivity of the midwives, and motivated them to deliver high-quality care, which contributed to an improvement in mother's confidence and reduction in conflicting information.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Molnar, Agnes, E-mail: molnar.agnes@sph.unideb.hu; Adam, Balazs, E-mail: adam.balazs@sph.unideb.hu; Antova, Temenujka, E-mail: t.antova@ncphp.government.bg
2012-02-15
Marginalised Roma communities in European countries live in substandard housing conditions the improvement of which has been one of the major issues of the Decade of Roma Inclusion, the ongoing intergovernmental European Roma programme. The paper presents EU-funded health impact assessments of national Roma housing policies and programmes in 3 Central and Eastern European countries in light of the evaluation of a completed local project in a fourth CEE country so as to compare predicted effects to observed ones. Housing was predicted to have beneficial health effects by improving indoor and outdoor conditions, access to services, and socioeconomic conditions. Negativemore » impacts were predicted only in terms of maintenance expenses and housing tenure. However, observed impacts of the completed local project did not fully support predictions especially in terms of social networks, satisfaction with housing and neighbourhood, and inhabitant safety. In order to improve the predictive value of HIA, more evidence should be produced by the careful evaluation of locally implemented housing projects. In addition, current evidence is in favour of planning Roma housing projects at the local rather than at the national level in alignment with the principle of subsidiarity. - Highlights: Black-Right-Pointing-Pointer Predictive validity of HIA of national Roma housing policies - in light of current evidence - is low. Black-Right-Pointing-Pointer Implemented housing projects should be comprehensively evaluated to improve reliability of HIA. Black-Right-Pointing-Pointer Roma housing projects should be planned at the local rather than at the national level. Black-Right-Pointing-Pointer HIA should be used to plan Roma housing projects at the local level.« less
Ninety to Nothing: a PDSA quality improvement project.
Prybutok, Gayle Linda
2018-05-14
Purpose The purpose of this paper is to present a case study of a successful quality improvement project in an acute care hospital focused on reducing the time of the total patient visit in the emergency department. Design/methodology/approach A multidisciplinary quality improvement team, using the PDSA (Plan, Do, Study, Act) Cycle, analyzed the emergency department care delivery process and sequentially made process improvements that contributed to project success. Findings The average turnaround time goal of 90 minutes or less per visit was achieved in four months, and the organization enjoyed significant collateral benefits both internal to the organization and for its customers. Practical implications This successful PDSA process can be duplicated by healthcare organizations of all sizes seeking to improve a process related to timely, high-quality patient care delivery. Originality/value Extended wait time in hospital emergency departments is a universal problem in the USA that reduces the quality of the customer experience and that delays necessary patient care. This case study demonstrates that a structured quality improvement process implemented by a multidisciplinary team with the authority to make necessary process changes can successfully redefine the norm.
NASA Fixed Wing Project: Green Technologies for Future Aircraft Generation
NASA Technical Reports Server (NTRS)
DelRosario, Ruben
2014-01-01
The NASA Fundamental Aeronautics Fixed Wing (FW) Project addresses the comprehensive challenge of enabling revolutionary energy efficiency improvements in subsonic transport aircraft combined with dramatic reductions in harmful emissions and perceived noise to facilitate sustained growth of the air transportation system. Advances in multidisciplinary technologies and the development of unconventional aircraft systems offer the potential to achieve these improvements. The presentation will highlight the FW Project vision of revolutionary systems and technologies needed to achieve the challenging goals of aviation. Specifically, the primary focus of the FW Project is on the N+3 generation that is, vehicles that are three generations beyond the current state of the art, requiring mature technology solutions in the 2025-30 timeframe.
Risk Quantification of Systems Engineering Documents Improves Probability of DOD Project Success
2009-09-01
comprehensive risk model for DoD milestone review documentation as well as recommended changes to the Capability Maturity Model Integration ( CMMI ) Project...Milestone Documentation, Project Planning, Rational Frame, Political Frame, CMMI Project Planning Process Area, CMMI Risk Management Process Area...well as recommended changes to the Capability Maturity Model Integration ( CMMI ) Project Planning and Risk Management process areas. The intent is to
Engels, Yvonne; van den Hombergh, Pieter; Mokkink, Henk; van den Hoogen, Henk; van den Bosch, Wil; Grol, Richard
2006-01-01
Aim To study the effects of a team-based model for continuous quality improvement (CQI) on primary care practice management. Design of study Randomised controlled trial. Setting Twenty-six intervention and 23 control primary care practices in the Netherlands. Method Practices interested in taking part in the CQI project were, after assessment of their practice organisation, randomly assigned to the intervention or control groups. During a total of five meetings, a facilitator helped the teams in the intervention group select suitable topics for quality improvement and follow a structured approach to achieve improvement objectives. Checklists completed by an outreach visitor, questionnaires for the GPs, staff and patients were used to assemble data on the number and quality of improvement activities undertaken and on practice management prior to the start of the intervention and 1 year later. Results Pre-test and post-test data were compared for the 26 intervention and 23 control practices. A significant intervention effect was found for the number of improvement objectives actually defined (93 versus 54, P<0.001) and successfully completed (80 versus 69% of the projects, P<0.001). The intervention group also improved on more aspects of practice management, as measured by our practice visit method, than the control group but none of these differences proved statistically significant. Conclusion The intervention exerted a significant effect on the number and quality of improvement projects undertaken and self-defined objectives met. Failure of the effects of the intervention on the other dimensions of practice management to achieve significance may be due to the topics selected for some of the improvement projects being only partly covered by the assessment instrument. PMID:17007709
Improving critical care discharge summaries: a collaborative quality improvement project using PDSA
Goulding, Lucy; Parke, Hannah; Maharaj, Ritesh; Loveridge, Robert; McLoone, Anne; Hadfield, Sophie; Helme, Eloise; Hopkins, Philip; Sandall, Jane
2015-01-01
Around 110,000 people spend time in critical care units in England and Wales each year. The transition of care from the intensive care unit to the general ward exposes patients to potential harms from changes in healthcare providers and environment. Nurses working on general wards report anxiety and uncertainty when receiving patients from critical care. An innovative form of enhanced capability critical care outreach called ‘iMobile’ is being provided at King's College Hospital (KCH). Part of the remit of iMobile is to review patients who have been transferred from critical care to general wards. The iMobile team wished to improve the quality of critical care discharge summaries. A collaborative evidence-based quality improvement project was therefore undertaken by the iMobile team at KCH in conjunction with researchers from King's Improvement Science (KIS). Plan, Do, Study, Act (PDSA) methodology was used. Three PDSA cycles were undertaken. Methods adopted comprised: a scoping literature review to identify relevant guidelines and research evidence to inform all aspects of the quality improvement project; a process mapping exercise; informal focus groups / interviews with staff; patient story-telling work with people who had experienced critical care and subsequent discharge to a general ward; and regular audits of the quality of both medical and nursing critical care discharge summaries. The following behaviour change interventions were adopted, taking into account evidence of effectiveness from published systematic reviews and considering the local context: regular audit and feedback of the quality of discharge summaries, feedback of patient experience, and championing and education delivered by local opinion leaders. The audit results were mixed across the trajectory of the project, demonstrating the difficulty of sustaining positive change. This was particularly important as critical care bed occupancy and through-put fluctuates which then impacts on work-load, with new cohorts of staff regularly passing through critical care. In addition to presenting the results of this quality improvement project, we also reflect on the lessons learned and make suggestions for future projects. PMID:26734368
Hayes, R; Bratzler, D; Armour, B; Moore, L; Murray, C; Stevens, B R; Radford, M; Fitzgerald, D; Elward, K; Ballard, D J
2001-03-01
A multistate randomized study conducted under the Health Care Financing Administration's (HCFA's) Health Care Quality Improvement Program (HCQIP) offered the opportunity to compare the effect of a written feedback intervention (WFI) with that of an enhanced feedback intervention (EFI) on improving the anticoagulant management of Medicare beneficiaries who present to the hospital with venous thromboembolic disease. Twenty-nine hospitals in five states were randomly assigned to receive written hospital-specific feedback (WFI) of feedback enhanced by the participation of a trained physician, quality improvement tools, and an Anticoagulant Management of Venous Thrombosis (AMVT) project liaison (EFI). Differences in the performance of five quality indicators between baseline and remeasurement were assessed. Quality managers were interviewed to determine perceptions of project implementation. No significant differences in the change from baseline to remeasurement were found between the two intervention groups. Significant improvement in one indicator and significant decline in two indicators were found for one or both groups. Yet 59% of all quality managers perceived the AMVT project as being successful to very successful, and more EFI quality managers perceived success than did WFI managers (71% versus 40%). In the majority of EFI hospitals, physician liaisons played an important role in project implementation. Study results indicated that the addition of a physician liaison, quality improvement tools, and a project liaison did not provide incremental value to hospital-specific feedback for improving quality of care. Future studies with larger sample sizes, lengthier follow-up periods, and interventions that include more of the elements shown to affect practice behavior change are needed to identify an optimal feedback model for use by external quality management organizations.
Reisinger, Janine D; Wojcik, Anna; Jenkins, Ian; Edson, Barbara; Pegues, David A; Greene, Linda
2017-08-01
The Centers for Disease Control and Prevention 2016 Healthcare-Associated Infections (HAI) Progress Report documented no change in catheter-associated urinary tract infections (CAUTIs) between 2009 and 2014. There is a need for investment in additional efforts to reduce HAIs, specifically CAUTI. Quality improvement fellowships are 1 approach to expand the capacity of dedicated leaders and infection prevention champions. The fellowship used a model that expanded collaboration among disciplines and focused on partnership by recruiting a diverse cohort of fellows and by providing 1-on-1 mentoring to enhance leadership development. The curriculum supported the Association for Professionals in Infection Control and Prevention Competency Model in 2 domains: leadership and performance improvement and implementation science. The fellowship was successful. The fellows and mentors had self-reported high level of satisfaction, fellows' knowledge increased, and they demonstrated leadership, quality improvement, and implementation science competency within the completed capstone projects. A model encompassing diverse educational topics, discussions, workshops, and mentorship can serve as a template for developing infection prevention champions. Although this project focused on CAUTI, this template can be used in a variety of settings and applied to a range of other HAIs and performance improvement projects. Copyright © 2017 Association for Professionals in Infection Control and Epidemiology, Inc. All rights reserved.
['Clinical auditing', a novel tool for quality assessment in surgical oncology].
van Leersum, Nicoline J; Kolfschoten, Nikki E; Klinkenbijl, Jean H G; Tollenaar, Rob A E M; Wouters, Michel W J M
2011-01-01
To determine whether systematic audit and feedback of information about the process and outcomes improve the quality of surgical care. Systematic literature review. Embase, PubMed, and Web of Science databases were searched for publications on 'quality assessment' and 'surgery'. The references of the publications found were examined as well. Publications were included in the review if the effect of auditing on the quality of surgical care had been investigated. In the databases 2415 publications were found. After selection, 28 publications describing the effect of auditing, whether or not combined with a quality improvement project, on guideline adherence or indications of outcomes of care were included. In 21 studies, a statistically significant positive effect of auditing was reported. In 5 studies a positive effect was found, but this was either not significant or statistical significance was not determined. In 2 studies no effect was observed. 5 studies compared the combination of auditing with a quality improvement project with auditing alone; 4 of these reported an additional effect of the quality improvement project. Audit and feedback of quality information seem to have a positive effect on the quality of surgical care. The use of quality information from audits for the purpose of a quality improvement project can enhance the positive effect of the audit.
Huntington, Jonathan T; Dycus, Paula; Hix, Carolyn; West, Rita; McKeon, Leslie; Coleman, Mary T; Hathaway, Donna; McCurren, Cynthia; Ogrinc, Greg
2009-01-01
Practice-based learning and improvement (PBLI) combines the science of continuous quality improvement with the pragmatics of day-to-day clinical care delivery. PBLI is a core-learning domain in nursing and medical education. We developed a workbook-based, project-focused curriculum to teach PBLI to novice health professional students. Evaluate the efficacy of a standardized curriculum to teach PBLI. Nonrandomized, controlled trial with medical and nursing students from 3 institutions. Faculty used the workbook to facilitate completion of an improvement project with 16 participants. Both participants and controls (N = 15) completed instruments to measure PBLI knowledge and self-efficacy. Participants also completed a satisfaction survey and presented project posters at a national conference. There was no significant difference in PBLI knowledge between groups. Self-efficacy of participants was higher than that of controls in identifying best practice, identifying measures, identifying successful local improvement work, implementing a structured change plan, and using Plan-Do-Study-Act methodology. Participant satisfaction with the curriculum was high. Although PBLI knowledge was similar between groups, participants had higher self-efficacy and confidently disseminated their findings via formal poster presentation. This pilot study suggests that using a workbook-based, project-focused approach may be effective in teaching PBLI to novice health professional students.
ERIC Educational Resources Information Center
Wisconsin Early Childhood Association, Madison.
A collection of 26 fact sheets on child care administration produced by the Wisconsin Child Care Improvement Project from 1986 through 1989 is presented. Individual fact sheets concern: national trends, center start-up, family day care start-up, site and facility acquisition, public funding, effective center operation, reporting of child abuse and…
ERIC Educational Resources Information Center
RIOUX, J. WILLIAM
THE PROJECT IS DESIGNED TO ENCOURAGE AND DIRECT TEACHERS IN THE USE OF UNCOMPLICATED SCIENTIFIC RESEARCH, RELATED TO CLASSWORK, FOR THE PURPOSE OF IMPROVING INSTRUCTION. TEACHERS IN JEFFERSON COUNTY SECONDARY SCHOOLS WERE SELECTED AT RANDOM TO CONSTITUTE AN EXPERIMENTAL GROUP. THEY PLANNED INDIVIDUAL RESEARCH PROJECTS WITH THE AID OF THE…
Facilitating Student Learning. J.W. Brister Library Monograph Series 5.
ERIC Educational Resources Information Center
Mayo, G., Douglas, Ed.
In 1974 a program was undertaken at the university to improve instruction by means of providing small grants to faculty members to carry out promising proposals for instructional improvement. Eleven projects were conducted in the second year of the program and are described in reports. The projects were for : (1) computer-based instruction in a…
Moving from I to Us: The Power of Action Research To Improve Students' Writing Performance.
ERIC Educational Resources Information Center
Miller, A. Christine; Cross, Lorraine
Project WATCH! (Writing Across the Curriculum Hawks!) was the 1999-2000 schoolwide action research project at the A.D. Henderson University School grades K-8. The study question, "How can teachers build schoolwide capacity to support improved student writing across the curriculum?", examined whole-school collaboration where all teachers understand…
Social science to improve fuels management: a synthesis of research on collaboration.
Victoria Sturtevant; Margaret Ann Moote; Pamela Jakes; Anthony S. Cheng
2005-01-01
A series of syntheses were commissioned by the USDA Forest Service to aid in fuels mitigation project planning. This synthesis focuses on collaboration research, and offers knowledge and tools to improve collaboration in the planning and implementation of wildland fire and fuels management projects. It covers a variety of topics including benefits of collaboration,...
A Blended Learning Route to Improving Innovation Education in Europe
ERIC Educational Resources Information Center
Page, Tom; Thorsteinsson, Gisli
2008-01-01
This paper introduces blended learning as a pedagogical approach, which was explored through the European project InnoEd and the way InnoEd undertook by using the on-line InnoEd VRLE. European educators in the InnoEd project have utilised a range of learning activities to help to improve Innovation Education. A mixture of lectures, visual…
Developing Effective Schools: Indicators of Educational Success As Roadmarks to Improvement.
ERIC Educational Resources Information Center
Jolly, Deborah V.; And Others
The first 3 years of a 4-year project to plan and implement school change using a school improvement strategy in five low income, rural, resource-bound school sites are described in this report. One school from each of the following states--Texas, New Mexico, Oklahoma, Arkansas, and Louisiana--participated in the project. Extreme diversity…
ERIC Educational Resources Information Center
Salvatierra da Silva, Daniela; Jacobson, Susan K.; Monroe, Martha C.; Israel, Glenn D.
2016-01-01
An evaluability assessment of a program to save a critically endangered bird helped prepare the Blue-throated Macaw Environmental Education Project for evaluation and program improvement. The evaluability assessment facilitated agreement among key stakeholders on evaluation criteria and intended uses of evaluation information in order to maximize…
Improving Social Skills through the Use of Cooperative Learning
ERIC Educational Resources Information Center
Dollman, Lucinda; Morgan, Catherine; Pergler, Jennifer; Russell, William; Watts, Jennifer
2007-01-01
The purpose of this action research project is to improve student social skills through the use of cooperative learning, in order to develop a positive classroom environment that is conducive to learning. The action research project will involve approximately 95 students, 95 parents, and 200 teachers. It is the intent of the teacher researchers to…
ERIC Educational Resources Information Center
Corporation for Public/Private Ventures, Philadelphia, PA.
This volume is one of the products of the knowledge development activities mounted in conjunction with research, evaluation, and development activities funded under the Youth Employment and Demonstration Projects Act of 1977. Based on the Ventures in Community Improvement (VICI) "enhanced" job training/job placement approach, which used…
ERIC Educational Resources Information Center
Clark, Donald M.; Rinehart, Richard L.
A model is presented for establishing or improving cooperative relationships between higher education and the employment community, as part of the American Council on Education's Higher Education/Comprehensive Employment and Training Act (CETA) Project, which was supported by the Fund for the Improvement of Postsecondary Education. Attention is…
2009-09-01
Executive CAIV Cost As an Independent Variable CAP Critical Acquisition Position CAPM Certified Associate in Project Management CCCM Certified...Professionals (PMP)............................33 b. Certified Associate in Project Management ( CAPM )............34 c. Program Management...34 Table 6. CAPM Requirements (After PMI CAPM , 2009). ...........................................34 Table 7
ERIC Educational Resources Information Center
McGaw, Barry; And Others
This booklet summarizes findings of a study, the Effective Schools Project, which sought to promote public discussion about improving educational quality in Australia. Questionnaires that were distributed with 300,000 booklets elicited a total of 7,203 responses from principals, parents, staff, and schools. Respondents were asked to identify the…
ERIC Educational Resources Information Center
Gordon, C. Wayne
The purpose of this preliminary report is to describe and evaluate the Los Angeles Model Mathematics Project (LAMMP). The objectives of this project include the improvement of mathematical skills and understanding of mathematical concepts, the improvement of students' self-image, the development of instructional materials and the assessment of…
Improving Self Service the Six Sigma Way at Newcastle University Library
ERIC Educational Resources Information Center
Kumi, Susan; Morrow, John
2006-01-01
Purpose: To report on the collaborative project between Newcastle University Library and 3M which aimed to increase self-issue levels using six sigma methodology. Design/methodology/approach: The six-month long project is outlined and gives an insight into the process improvement methodology called six sigma. An explanation of why we ran the…
Using Group Projects to Teach Process Improvement in a Quality Class
ERIC Educational Resources Information Center
Neidigh, Robert O.
2016-01-01
This paper provides a description of a teaching approach that uses experiential learning to teach process improvement. The teaching approach uses student groups to perform and gather process data in a senior-level quality management class that focuses on Lean Six Sigma. A strategy to link the experiential learning in the group projects to the…
ERIC Educational Resources Information Center
Karagiorgi, Yiasemina; Nicolaidou, Maria; Yiasemis, Christos; Georghiades, Petros
2015-01-01
This article aims to illustrate a school self-evaluation project implemented in three Cyprus primary schools. The project adopted three theoretical assumptions, namely, an orientation towards school improvement, a participatory school-level approach allowing support from a critical friend and a focus on effective teaching. In line with a…
Distributed Wind Competitiveness Improvement Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
2016-05-01
The Competitiveness Improvement Project (CIP) is a periodic solicitation through the U.S. Department of Energy and its National Renewable Energy Laboratory. Manufacturers of small and medium wind turbines are awarded cost-shared grants via a competitive process to optimize their designs, develop advanced manufacturing processes, and perform turbine testing. The goals of the CIP are to make wind energy cost competitive with other distributed generation technology and increase the number of wind turbine designs certified to national testing standards. This fact sheet describes the CIP and funding awarded as part of the project.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sara, T.S.; Jones, M. Jr.
1986-08-01
The project being reported in this document had three components: (1) a research project to carry out cost-benefit analysis of an ethyl alcohol plant at Tuskegee University, (2) seminars to improve the high-technology capabilities of minority persons, and (3) a class in energy management. The report provides a background on the three components listed above. The results from the research on the ethyl alcohol plant, are discussed, along with the seminars, and details of the energy management class.
Indigenous health: effective and sustainable health services through continuous quality improvement.
Bailie, Ross S; Si, Damin; O'Donoghue, Lyn; Dowden, Michelle
2007-05-21
The Australian government's Healthy for Life program is supporting capacity development in Indigenous primary care using continuous quality improvement (CQI) techniques. An important influence on the Healthy for Life program has been the ABCD research project. The key features contributing to the success of the project are described. The ABCD research project: uses a CQI approach, with an ongoing cycle of gathering data on how well organisational systems are functioning, and developing and then implementing improvements; is guided by widely accepted principles of community-based research, which emphasise participation; and adheres to the principles and values of Indigenous health research and service delivery. The potential for improving health outcomes in Aboriginal and Torres Strait Islander communities using a CQI approach should be strengthened by clear clinical and managerial leadership, supporting service organisations at the community level, and applying participatory-action principles.
Ethical issues in using data from quality management programs.
Nerenz, David R
2009-08-01
Since the advent of formal, data-driven quality improvement programs in health care in the late 1980s and early 1990s, there are have been questions raised about requirements for ethical committee review of quality improvement activities. A form of consensus emerged through a series of articles published between 1996 and 2007, but there is still significant variation among ethics review committees and individual project leaders in applying broad policies on requirements for committee review and/or written informed consent by participants. Recent developments in quality management, particularly the creation and use of multi-site disease registries, have raised new questions about requirements for review and consent, since the activities often have simultaneous research and quality improvement goals. This article discusses ways in which policies designed for local quality improvement projects and data bases may be adapted to apply to multi-site registries and research projects related to them.
24 CFR 241.640 - Employment discrimination prohibited.
Code of Federal Regulations, 2010 CFR
2010-04-01
... AUTHORITIES SUPPLEMENTARY FINANCING FOR INSURED PROJECT MORTGAGES Eligibility Requirements-Supplemental Loans... Individual Utility Meters in Multifamily Projects Without a HUD-Insured or HUD-Held Mortgage Special... performance of constructing the improvements to the project shall provide that there shall be no...
Recommendations for Constructing Roadside Vegetation Barriers to Improve Near-Road Air Quality
Recommendations for external partners planting roadside vegetation. Intended for broad use, but immediate use will be to provide to project partners on the RESES roadside vegetation project and as an attachment to the RESES project QAPP
NREL Algal Biofuels Projects and Partnerships
DOE Office of Scientific and Technical Information (OSTI.GOV)
2016-10-01
This fact sheet highlights several algal biofuels research and development projects focused on improving the economics of the algal biofuels production process. These projects should serve as a foundation for the research efforts toward algae as a source of fuels and other chemicals.
7 CFR 4280.171 - Project eligibility.
Code of Federal Regulations, 2012 CFR
2012-01-01
... General Renewable Energy System Feasibility Study Grants § 4280.171 Project eligibility. Only renewable energy system projects that meet the requirements specified in this section are eligible for feasibility...) Be for the purchase, installation, expansion, or other energy-related improvement of a renewable...
7 CFR 4280.171 - Project eligibility.
Code of Federal Regulations, 2014 CFR
2014-01-01
... General Renewable Energy System Feasibility Study Grants § 4280.171 Project eligibility. Only renewable energy system projects that meet the requirements specified in this section are eligible for feasibility...) Be for the purchase, installation, expansion, or other energy-related improvement of a renewable...
7 CFR 4280.171 - Project eligibility.
Code of Federal Regulations, 2013 CFR
2013-01-01
... General Renewable Energy System Feasibility Study Grants § 4280.171 Project eligibility. Only renewable energy system projects that meet the requirements specified in this section are eligible for feasibility...) Be for the purchase, installation, expansion, or other energy-related improvement of a renewable...
DOT National Transportation Integrated Search
2000-03-01
Procurement of Intelligent Transportation System (ITS) projects using Federal-aid funds can present challenges that are not typically observed in traditional transportation projects. Many roadway improvement projects involve the two-step "Design-Bid-...
Viravaidya, M; Wolf, R C; Guest, P
2008-01-01
Stigmatization and discrimination against people living with HIV/AIDS (PLHA), and their families, remains a barrier to participation in prevention and care programmes. This barrier takes on added significance as Thailand expands provision of free antiretroviral therapy (ART). This paper documents an innovative approach to improve quality of life for PLHA, while reducing levels of stigma and discrimination. The Population and Community Development Association (PDA) began implementing the Positive Partnership Project (PPP) in 2002. In this project, an HIV-negative person must team up with an HIV-positive person to become eligible for a loan for income-generating activities. The use of microcredit to explicitly reduce stigma and discrimination is a unique feature of the PPP. While the microcredit component of the project is an important dimension for improving the status of participating PLHA, the impacts of the project extend far beyond the PLHA who receive loans. Both directly and indirectly, it has contributed to improved quality of life and economic conditions for PLHA, while raising their visibility and acceptance in hundreds of communities throughout urban and rural Thailand. This paper identifies key features of the project and considerations for adapting its use in other settings.
Advanced Ship Detection For Spaceborne Based Maritime Awareness
NASA Astrophysics Data System (ADS)
Radius, Andrea; Ferreira, Joao; Carmo, Paulo; Marques, Paulo
2013-12-01
In the last years the increase in marine traffic generated the necessity of global monitoring for marine environment management in terms of safety, security and fisheries. The increasing number of new satellite-based Synthetic Aperture Radar (SAR) systems, and the intrinsic capability of the transmitted electromagnetic pulses to interact with the ships and to retrieve its cinematic characteristics, made this instrument particularly fit to improve global maritime awareness through the fusion with cooperative data (AIS, VMS, LRIT). The growing need of global maritime awareness gave a push to the realization of different projects in the European context, each one focused on a different particular objective. Particularly useful is the synergy between the operational and research aspects, being the goal of the last to improve the state of the art in the field of ship detection. Two European projects are the key to strive this synergy: the project MARitime Security Service (MARISS), which implements the operational capability, and the R&D Dolphin projects, which is focused on the deep exploitation of remote sensing data and on the technological development of advanced techniques for ship detection and classification purposes, and Seabilla project, which is also dedicated to improve the current ship detection capability and to fuse all the available information from different data sources for border surveillance optimization. This paper introduces the multipurpose Edisoft Vessel Detection software (EdiVDC) implemented by the EDISOFT company, which comes from the necessity to respect increasingly stringent requirements in terms of ship detection. The EdiVDC software is being operationally used in the framework of the MARISS project and it integrates advanced processing algorithms, developed in the scope of the Dolphin project with the cooperation of ISEL-IT (Instituto de Telecomunicações), and data simulators, developed in the context of the Seabilla project, improving the software capability and introducing new functionalities. In this work we present the functionalities of the software and the main results achieved with different types of SAR data.
Ricca, Jim; Kureshy, Nazo; LeBan, Karen; Prosnitz, Debra; Ryan, Leo
2014-03-01
Evidence exists that community-based intervention packages can have substantial child and newborn mortality impact, and may help more countries meet Millennium Development Goal 4 (MDG 4) targets. A non-governmental organization (NGO) project using such programming in Mozambique documented an annual decline in under-five mortality rate (U5MR) of 9.3% in a province in which Demographic and Health Survey (DHS) data showed a 4.2% U5MR decline during the same period. To test the generalizability of this finding, the same analysis was applied to a group of projects funded by the US Agency for International Development. Projects supported implementation of community-based intervention packages aimed at increasing use of health services while improving preventive and home-care practices for children under five. All projects collect baseline and endline population coverage data for key child health interventions. Twelve projects fitted the inclusion criteria. U5MR decline was estimated by modelling these coverage changes in the Lives Saved Tool (LiST) and comparing with concurrent measured DHS mortality data. Average coverage changes for all interventions exceeded average concurrent trends. When population coverage changes were modelled in LiST, they were estimated to give a child mortality improvement in the project area that exceeded concurrent secular trend in the subnational DHS region in 11 of 12 cases. The average improvement in modelled U5MR (5.8%) was more than twice the concurrent directly measured average decline (2.5%). NGO projects implementing community-based intervention packages appear to be effective in reducing child mortality in diverse settings. There is plausible evidence that they raised coverage for a variety of high-impact interventions and improved U5MR by more than twice the concurrent secular trend. All projects used community-based strategies that achieved frequent interpersonal contact for health behaviour change. Further study of the effectiveness and scalability of similar packages should be part of the effort to accelerate progress towards MDG 4.
ERIC Educational Resources Information Center
Aquino, Karl; Serva, Mark A.
2005-01-01
This article describes a project that simulates the interplay between management and development project teams in a business environment. Each student team was assigned a management role supervising one project and a development role implementing another project. Results indicate that teams that communicate regularly and interact socially outside…
ERIC Educational Resources Information Center
Rodriguez, Jacinto
2013-01-01
This mixed method exploratory case study was used to explore the effect data overload has on project management, how data overload affects project management effectiveness, how prepared program office staff is to manage multiple projects effectively, and how the program office's organizational structure and data management systems affect project…
Chapter 12 - Mapping wildland fuel across large regions for the LANDFIRE Prototype Project
Robert E. Keane; Tracey Frescino; Matthew C. Reeves; Jennifer L. Long
2006-01-01
The Landscape Fire and Resource Management Planning Tools Prototype Project, or LANDFIRE Prototype Project, required that the entire array of wildland fuel characteristics be mapped to provide fire and landscape managers with consistent baseline geo-spatial information to plan projects for hazardous fuel mitigation and to improve public and firefighter safety. Fuel...
ERIC Educational Resources Information Center
Maqsood, Tayyab; Finegan, Andrew; Walker, Derek
2006-01-01
Purpose: With the advent of information and communication technologies (ICT), some organisations have endeavoured to develop and maintain systems commonly known as project histories. This paper aims to provide a framework to the construction organisations in order to improve the learning from projects through the development and use of project…