Sample records for xt-ads lessons learned

  1. In-orbit results of Delfi-n3Xt: Lessons learned and move forward

    NASA Astrophysics Data System (ADS)

    Guo, Jian; Bouwmeester, Jasper; Gill, Eberhard

    2016-04-01

    This paper provides an update of the Delfi nanosatellite programme of the Delft University of Technology (TU Delft), with a focus on the recent in-orbit results of the second TU Delft satellite Delfi-n3Xt. In addition to the educational objective that has been reached with more than 80 students involved in the project, most of the technological objectives of Delfi-n3Xt have also been fulfilled with successful in-orbit demonstrations of payloads and platform. Among these demonstrations, four are highlighted in this paper, including a solid cool gas micropropulsion system, a new type of solar cell, a more robust Command and Data Handling Subsystem (CDHS), and a highly integrated Attitude Determination and Control Subsystem (ADCS) that performs three-axis active control using reaction wheels. Through the development of Delfi-n3Xt, significant experiences and lessons have been learned, which motivated a further step towards DelFFi, the third Delfi CubeSat mission, to demonstrate autonomous formation flying using two CubeSats named Delta and Phi. A brief update of the DelFFi mission is also provided.

  2. Lessons Learned in Engineering

    NASA Technical Reports Server (NTRS)

    Blair, J. C.; Ryan, R. S.; Schutzenhofer, L. A.

    2011-01-01

    This Contractor Report (CR) is a compilation of Lessons Learned in approximately 55 years of engineering experience by each James C. Blair, Robert S. Ryan, and Luke A. Schutzenhofer. The lessons are the basis of a course on Lessons Learned that has been taught at Marshall Space Flight Center. The lessons are drawn from NASA space projects and are characterized in terms of generic lessons learned from the project experience, which are further distilled into overarching principles that can be applied to future projects. Included are discussions of the overarching principles followed by a listing of the lessons associated with that principle. The lesson with sub-lessons are stated along with a listing of the project problems the lesson is drawn from, then each problem is illustrated and discussed, with conclusions drawn in terms of Lessons Learned. The purpose of this CR is to provide principles learned from past aerospace experience to help achieve greater success in future programs, and identify application of these principles to space systems design. The problems experienced provide insight into the engineering process and are examples of the subtleties one experiences performing engineering design, manufacturing, and operations.

  3. Autosomal dominant frontonasal dysplasia (atypical Greig syndrome): Lessons from the Xt mutant mouse

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cunningham, M.L.; Nunes, M.E.

    1994-09-01

    Greig syndrome is the autosomal dominant association of mild hypertelorism, variable polysyndactyly, and normal intelligence. Several families have been found to have translocations or deletions of 7p13 interrupting the normal expression of GLI3 (a zinc finger, DNA binding, transcription repressor). Recently, a mutation in the mouse homologue of GLI3 was found in the extra-toes mutant mouse (Xt). The phenotypic features of this mouse model include mild hypertelorism, postaxial polydactyly of the forelimbs, preaxial polydactyly of the hindlimbs, and variable tibial hemimelia. The homozygous mutant Xt/Xt have severe frontonasal dysplasia (FND), polysyndactyly of fore-and hindlimbs and invariable tibial hemimelia. We havemore » recently evaluated a child with severe (type D) frontonasal dysplasia, fifth finger camptodactyly, preaxial polydactyly of one foot, and ispilateral tibial hemimelia. His father was born with a bifid nose, broad columnella, broad feet, and a two centimeter leg length discrepancy. The paternal grandmother of the proband is phenotypically normal; however, her fraternal twin died at birth with severe facial anomalies. The paternal great-grandmother of the proband is phenotypically normal however her niece was born with moderate ocular hypertelorism. This pedigree is suggestive of an autosomal dominant form of frontonasal dysplasia with variable expressivity. The phenotypic features of our case more closely resemble the Xt mouse than the previously defined features of Greig syndrome in humans. This suggests that a mutation in GLI3 may be responsible for FND in this family. We are currently using polymorphic dinucleotide repeat markers flanking GLI3 in a attempt to demonstrate linkage in this pedigree. Demonstration of a GLI3 mutation in this family would broaden our view of the spectrum of phenotypes possible in Greig syndrome and could provide insight into genotype/phenotype correlation in FND.« less

  4. Lesson Learning at JPL

    NASA Technical Reports Server (NTRS)

    Oberhettinger, David

    2011-01-01

    A lessons learned system is a hallmark of a mature engineering organization A formal lessons learned process can help assure that valuable lessons get written and published, that they are well-written, and that the essential information is "infused" into institutional practice. Requires high-level institutional commitment, and everyone's participation in gathering, disseminating, and using the lessons

  5. Lessons Learned in Engineering. Supplement

    NASA Technical Reports Server (NTRS)

    Blair, James C.; Ryan, Robert S.; Schultzenhofer, Luke A.

    2011-01-01

    This Contractor Report (CR) is a compilation of Lessons Learned in approximately 55 years of engineering experience by each James C. Blair, Robert S. Ryan, and Luke A. Schutzenhofer. The lessons are the basis of a course on Lessons Learned that has been taught at Marshall Space Flight Center. The lessons are drawn from NASA space projects and are characterized in terms of generic lessons learned from the project experience, which are further distilled into overarching principles that can be applied to future projects. Included are discussions of the overarching principles followed by a listing of the lessons associated with that principle. The lesson with sub-lessons are stated along with a listing of the project problems the lesson is drawn from, then each problem is illustrated and discussed, with conclusions drawn in terms of Lessons Learned. The purpose of this CR is to provide principles learned from past aerospace experience to help achieve greater success in future programs, and identify application of these principles to space systems design. The problems experienced provide insight into the engineering process and are examples of the subtleties one experiences performing engineering design, manufacturing, and operations. The supplemental CD contains accompanying PowerPoint presentations.

  6. Constellation Program Lessons Learned. Volume 2; Detailed Lessons Learned

    NASA Technical Reports Server (NTRS)

    Rhatigan, Jennifer; Neubek, Deborah J.; Thomas, L. Dale

    2011-01-01

    These lessons learned are part of a suite of hardware, software, test results, designs, knowledge base, and documentation that comprises the legacy of the Constellation Program. The context, summary information, and lessons learned are presented in a factual format, as known and described at the time. While our opinions might be discernable in the context, we have avoided all but factually sustainable statements. Statements should not be viewed as being either positive or negative; their value lies in what we did and what we learned that is worthy of passing on. The lessons include both "dos" and "don ts." In many cases, one person s "do" can be viewed as another person s "don t"; therefore, we have attempted to capture both perspectives when applicable and useful. While Volume I summarizes the views of those who managed the program, this Volume II encompasses the views at the working level, describing how the program challenges manifested in day-to-day activities. Here we see themes that were perhaps hinted at, but not completely addressed, in Volume I: unintended consequences of policies that worked well at higher levels but lacked proper implementation at the working level; long-term effects of the "generation gap" in human space flight development, the need to demonstrate early successes at the expense of thorough planning, and the consequences of problems and challenges not yet addressed because other problems and challenges were more immediate or manifest. Not all lessons learned have the benefit of being operationally vetted, since the program was cancelled shortly after Preliminary Design Review. We avoid making statements about operational consequences (with the exception of testing and test flights that did occur), but we do attempt to provide insight into how operational thinking influenced design and testing. The lessons have been formatted with a description, along with supporting information, a succinct statement of the lesson learned, and

  7. Evaluation of red blood cell and platelet antigen genotyping platforms (ID CORE XT/ID HPA XT) in routine clinical practice.

    PubMed

    Finning, Kirstin; Bhandari, Radhika; Sellers, Fiona; Revelli, Nicoletta; Villa, Maria Antonietta; Muñiz-Díaz, Eduardo; Nogués, Núria

    2016-03-01

    High-throughput genotyping platforms enable simultaneous analysis of multiple polymorphisms for blood group typing. BLOODchip® ID is a genotyping platform based on Luminex® xMAP technology for simultaneous determination of 37 red blood cell (RBC) antigens (ID CORE XT) and 18 human platelet antigens (HPA) (ID HPA XT) using the BIDS XT software. In this international multicentre study, the performance of ID CORE XT and ID HPA XT, using the centres' current genotyping methods as the reference for comparison, and the usability and practicality of these systems, were evaluated under working laboratory conditions. DNA was extracted from whole blood in EDTA with Qiagen methodologies. Ninety-six previously phenotyped/genotyped samples were processed per assay: 87 testing samples plus five positive controls and four negative controls. Results were available for 519 samples: 258 with ID CORE XT and 261 with ID HPA XT. There were three "no calls" that were either caused by human error or resolved after repeating the test. Agreement between the tests and reference methods was 99.94% for ID CORE XT (9,540/9,546 antigens determined) and 100% for ID HPA XT (all 4,698 alleles determined). There were six discrepancies in antigen results in five RBC samples, four of which (in VS, N, S and Do(a)) could not be investigated due to lack of sufficient sample to perform additional tests and two of which (in S and C) were resolved in favour of ID CORE XT (100% accuracy). The total hands-on time was 28-41 minutes for a batch of 16 samples. Compared with the reference platforms, ID CORE XT and ID HPA XT were considered simpler to use and had shorter processing times. ID CORE XT and ID HPA XT genotyping platforms for RBC and platelet systems were accurate and user-friendly in working laboratory settings.

  8. Engineering Lessons Learned and Systems Engineering Applications

    NASA Technical Reports Server (NTRS)

    Gill, Paul S.; Garcia, Danny; Vaughan, William W.

    2005-01-01

    Systems Engineering is fundamental to good engineering, which in turn depends on the integration and application of engineering lessons learned. Thus, good Systems Engineering also depends on systems engineering lessons learned from within the aerospace industry being documented and applied. About ten percent of the engineering lessons learned documented in the NASA Lessons Learned Information System are directly related to Systems Engineering. A key issue associated with lessons learned datasets is the communication and incorporation of this information into engineering processes. As part of the NASA Technical Standards Program activities, engineering lessons learned datasets have been identified from a number of sources. These are being searched and screened for those having a relation to Technical Standards. This paper will address some of these Systems Engineering Lessons Learned and how they are being related to Technical Standards within the NASA Technical Standards Program, including linking to the Agency's Interactive Engineering Discipline Training Courses and the life cycle for a flight vehicle development program.

  9. Engineering Lessons Learned and Systems Engineering Applications

    NASA Technical Reports Server (NTRS)

    Gill, Paul S.; Garcia, Danny; Vaughan, William W.

    2005-01-01

    Systems Engineering is fundamental to good engineering, which in turn depends on the integration and application of engineering lessons learned and technical standards. Thus, good Systems Engineering also depends on systems engineering lessons learned from within the aerospace industry being documented and applied. About ten percent of the engineering lessons learned documented in the NASA Lessons Learned Information System are directly related to Systems Engineering. A key issue associated with lessons learned datasets is the communication and incorporation of this information into engineering processes. Systems Engineering has been defined (EINIS-632) as "an interdisciplinary approach encompassing the entire technical effort to evolve and verify an integrated and life-cycle balanced set of system people, product, and process solutions that satisfy customer needs". Designing reliable space-based systems has always been a goal for NASA, and many painful lessons have been learned along the way. One of the continuing functions of a system engineer is to compile development and operations "lessons learned" documents and ensure their integration into future systems development activities. They can produce insights and information for risk identification identification and characterization. on a new project. Lessons learned files from previous projects are especially valuable in risk

  10. Lessons Learned for Improving Spacecraft Ground Operations

    NASA Technical Reports Server (NTRS)

    Bell, Michael; Henderson, Gena; Stambolian, Damon

    2013-01-01

    NASA policy requires each Program or Project to develop a plan for how they will address Lessons Learned. Projects have the flexibility to determine how best to promote and implement lessons learned. A large project might budget for a lessons learned position to coordinate elicitation, documentation and archival of the project lessons. The lessons learned process crosses all NASA Centers and includes the contactor community. o The Office of The Chief Engineer at NASA Headquarters in Washington D.C., is the overall process owner, and field locations manage the local implementation. One tool used to transfer knowledge between program and projects is the Lessons Learned Information System (LLIS). Most lessons come from NASA in partnership with support contractors. A search for lessons that might impact a new design is often performed by a contractor team member. Knowledge is not found with only one person, one project team, or one organization. Sometimes, another project team, or person, knows something that can help your project or your task. Knowledge sharing is an everyday activity at the Kennedy Space Center through storytelling, Kennedy Engineering Academy presentations and through searching the Lessons Learned Information system. o Project teams search the lessons repository to ensure the best possible results are delivered. o The ideas from the past are not always directly applicable but usually spark new ideas and innovations. Teams have a great responsibility to collect and disseminate these lessons so that they are shared with future generations of space systems designers. o Leaders should set a goal for themselves to host a set numbers of lesson learned events each year and do more to promote multiple methods of lessons learned activities. o High performing employees are expected to share their lessons, however formal knowledge sharing presentation are not the norm for many employees.

  11. Unmanned Ground Vehicle (UGV) Lessons Learned

    DTIC Science & Technology

    2001-11-01

    iii 1. INTRODUCTION ....................................................................................................... 1 1.1... INTRODUCTION 1.1 PURPOSE The purpose of this effort is to compile Lessons Learned from the unmanned ground vehicle (UGV) programs that could be relevant to... introduction of gunpowder, this lesson was no longer valid. Castles crumbled and new lessons had to be learned. One such lesson was that the faster

  12. Lesson Study-Building Communities of Learning Among Pre-Service Science Teachers

    NASA Astrophysics Data System (ADS)

    Hamzeh, Fouada

    Lesson Study is a widely used pedagogical approach that has been used for decades in its country of origin, Japan. It is a teacher-led form of professional development that involves the collaborative efforts of teachers in co-planning and observing the teaching of a lesson within a unit for evidence that the teaching practices used help the learning process (Lewis, 2002a). The purpose of this research was to investigate if Lesson Study enables pre-service teachers to improve their own teaching in the area of science inquiry-based approaches. Also explored are the self-efficacy beliefs of one group of science pre-service teachers related to their experiences in Lesson Study. The research investigated four questions: 1) Does Lesson Study influence teacher preparation for inquiry-based instruction? 2) Does Lesson Study improve teacher efficacy? 3) Does Lesson Study impact teachers' aspiration to collaborate with colleagues? 4) What are the attitudes and perceptions of pre-service teachers to the Lesson Study idea in Science? The 12 participants completed two pre- and post-study surveys: STEBI- B, Science Teaching Efficacy Belief Instrument (Enochs & Riggs, 1990) and ASTQ, Attitude towards Science Teaching. Data sources included student teaching lesson observations, lesson debriefing notes and focus group interviews. Results from the STEBI-B show that all participants measured an increase in efficacy throughout the study. This study added to the body of research on teaching learning communities, professional development programs and teacher empowerment.

  13. Apollo 1 Lessons Learned Show

    NASA Image and Video Library

    2017-01-27

    Mike Ciannilli, the Apollo, Challenger, Columbia Lessons Learned Program manager, far right, is pictured with panelists from the Apollo 1 Lessons Learned event in the Training Auditorium at NASA's Kennedy Space Center in Florida. In the center, are Ernie Reyes, retired, former Apollo 1 senior operations manager; and John Tribe, retired, former Apollo 1 Reaction and Control System lead engineer. At far left is Zulie Cipo, the Apollo, Challenger, Columbia Lessons Learned Program event support team lead. The theme of the program was "To there and Back Again." The event helped pay tribute to the Apollo 1 crew, Gus Grissom, Ed White II, and Roger Chaffee.

  14. Lessons Learned and Technical Standards: A Logical Marriage

    NASA Technical Reports Server (NTRS)

    Gill, Paul; Vaughan, William W.; Garcia, Danny; Gill, Maninderpal S. (Technical Monitor)

    2001-01-01

    A comprehensive database of lessons learned that corresponds with relevant technical standards would be a boon to technical personnel and standards developers. The authors discuss the emergence of one such database within NASA, and show how and why the incorporation of lessons learned into technical standards databases can be an indispensable tool for government and industry. Passed down from parent to child, teacher to pupil, and from senior to junior employees, lessons learned have been the basis for our accomplishments throughout the ages. Government and industry, too, have long recognized the need to systematically document And utilize the knowledge gained from past experiences in order to avoid the repetition of failures and mishaps. The use of lessons learned is a principle component of any organizational culture committed to continuous improvement. They have formed the foundation for discoveries, inventions, improvements, textbooks, and technical standards. Technical standards are a very logical way to communicate these lessons. Using the time-honored tradition of passing on lessons learned while utilizing the newest in information technology, the National Aeronautics and Space Administration (NASA) has launched an intensive effort to link lessons learned with specific technical standards through various Internet databases. This article will discuss the importance of lessons learned to engineers, the difficulty in finding relevant lessons learned while engaged in an engineering project, and the new NASA project that can help alleviate this difficulty. The article will conclude with recommendations for more expanded cross-sectoral uses of lessons learned with reference to technical standards.

  15. Implementation of a commercial-grade dedication program - Benefits and lessons learned

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harrington, M.; MacFarlane, I.

    1991-01-01

    The recent issuance of industry guidelines, the Nuclear Management and Resources Council procurement initiative, and a US Nuclear Regulatory Commission NRC generic letter on commercial-grade item dedication (CGD) has been viewed by many utility managers and executives as only adding to the existing burden of compliance with regulatory requirements. While the incorporation of these documents into existing CGD programs has created additional costs, the resulting enhanced dedication programs have also produced benefits beyond regulatory compliance, and some lessons have been learned. This paper discusses the benefits and the lessons learned during implementation of an enhanced CGD program at New Hampshiremore » Yankee's (NHY's) Seabrook nuclear plant. Based on NHY's experience, it is believed that the benefits described in this paper can be realized by other utilities implementing CGD programs.« less

  16. Human Spaceflight Conjunction Assessment: Lessons Learned

    NASA Technical Reports Server (NTRS)

    Smith, Jason T.

    2011-01-01

    This viewgraph presentation reviews the process of a human space flight conjunction assessment and lessons learned from the more than twelve years of International Space Station (ISS) operations. Also, the application of these lessons learned to a recent ISS conjunction assessment with object 84180 on July 16, 2009 is also presented.

  17. Launch Vehicle Propulsion Life Cycle Cost Lessons Learned

    NASA Technical Reports Server (NTRS)

    Zapata, Edgar; Rhodes, Russell E.; Robinson, John W.

    2010-01-01

    This paper will review lessons learned for space transportation systems from the viewpoint of the NASA, Industry and academia Space Propulsion Synergy Team (SPST). The paper provides the basic idea and history of "lessons learned". Recommendations that are extremely relevant to NASA's future investments in research, program development and operations are"'provided. Lastly, a novel and useful approach to documenting lessons learned is recommended, so as to most effectively guide future NASA investments. Applying lessons learned can significantly improve access to space for cargo or people by focusing limited funds on the right areas and needs for improvement. Many NASA human space flight initiatives have faltered, been re-directed or been outright canceled since the birth of the Space Shuttle program. The reasons given at the time have been seemingly unique. It will be shown that there are common threads as lessons learned in many a past initiative.

  18. Accuracy of the Garmin 920 XT HRM to perform HRV analysis.

    PubMed

    Cassirame, Johan; Vanhaesebrouck, Romain; Chevrolat, Simon; Mourot, Laurent

    2017-12-01

    Heart rate variability (HRV) analysis is widely used to investigate autonomous cardiac drive. This method requires periodogram measurement, which can be obtained by an electrocardiogram (ECG) or from a heart rate monitor (HRM), e.g. the Garmin 920 XT device. The purpose of this investigation was to assess the accuracy of RR time series measurements from a Garmin 920 XT HRM as compared to a standard ECG, and to verify whether the measurements thus obtained are suitable for HRV analysis. RR time series were collected simultaneously with an ECG (Powerlab system, AD Instruments, Castell Hill, Australia) and a Garmin XT 920 in 11 healthy subjects during three conditions, namely in the supine position, the standing position and during moderate exercise. In a first step, we compared RR time series obtained with both tools using the Bland and Altman method to obtain the limits of agreement in all three conditions. In a second step, we compared the results of HRV analysis between the ECG RR time series and Garmin 920 XT series. Results show that the accuracy of this system is in accordance with the literature in terms of the limits of agreement. In the supine position, bias was 0.01, - 2.24, + 2.26 ms; in the standing position, - 0.01, - 3.12, + 3.11 ms respectively, and during exercise, - 0.01, - 4.43 and + 4.40 ms. Regarding HRV analysis, we did not find any difference for HRV analysis in the supine position, but the standing and exercise conditions both showed small modifications.

  19. Apollo 1 Lessons Learned Show

    NASA Image and Video Library

    2017-01-27

    Mike Ciannilli, at left, the Apollo, Challenger, Columbia Lessons Learned Program manager, presents a certificate to John Tribe, retired, Apollo 1 Reaction and Control System lead engineer, during the Apollo 1 Lessons Learned presentation in the Training Auditorium at NASA's Kennedy Space Center in Florida. The theme of the program was "To there and Back Again." The event helped pay tribute to the Apollo 1 crew, Gus Grissom, Ed White II, and Roger Chaffee.

  20. Apollo 1 Lessons Learned Show

    NASA Image and Video Library

    2017-01-27

    Mike Ciannilli, the Apollo, Challenger, Columbia Lessons Learned program manager, at left, presents a certificate to Ernie Reyes, retired, former Apollo 1 senior operations manager, during the Apollo 1 Lessons Learned presentation in the Training Auditorium at NASA's Kennedy Space Center in Florida. The theme of the program was "To there and Back Again." The event helped pay tribute to the Apollo 1 crew, Gus Grissom, Ed White II, and Roger Chaffee.

  1. A performance evaluation of the IBM 370/XT personal computer

    NASA Technical Reports Server (NTRS)

    Dominick, Wayne D. (Editor); Triantafyllopoulos, Spiros

    1984-01-01

    An evaluation of the IBM 370/XT personal computer is given. This evaluation focuses primarily on the use of the 370/XT for scientific and technical applications and applications development. A measurement of the capabilities of the 370/XT was performed by means of test programs which are presented. Also included is a review of facilities provided by the operating system (VM/PC), along with comments on the IBM 370/XT hardware configuration.

  2. Apollo 1 Lessons Learned Show

    NASA Image and Video Library

    2017-01-27

    Mike Ciannilli, at left, the Apollo, Challenger, Columbia Lessons Learned Program manager, presents a certificate to Charlie Duke, former Apollo 16 astronaut and member of the Apollo 1 Emergency Egress Investigation Team, during the Apollo 1 Lessons Learned presentation in the Training Auditorium at NASA's Kennedy Space Center in Florida. The program's theme was "To There and Back Again." The event helped pay tribute to the Apollo 1 crew, Gus Grissom, Ed White II, and Roger Chaffee.

  3. Brownfields City of Cleveland: Deconstruction Lessons Learned Report

    EPA Pesticide Factsheets

    This technical memorandum presents an overview of Cleveland’s current deconstruction initiative goals and lessons learned (in the Cleveland area) and potential strategies for addressing lessons learned.

  4. Considerations for implementing an organizational lessons learned process.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fosshage, Erik D

    2013-05-01

    This report examines the lessons learned process by a review of the literature in a variety of disciplines, and is intended as a guidepost for organizations that are considering the implementation of their own closed-loop learning process. Lessons learned definitions are provided within the broader context of knowledge management and the framework of a learning organization. Shortcomings of existing practices are summarized in an attempt to identify common pitfalls that can be avoided by organizations with fledgling experiences of their own. Lessons learned are then examined through a dual construct of both process and mechanism, with emphasis on integrating intomore » organizational processes and promoting lesson reuse through data attributes that contribute toward changed behaviors. The report concludes with recommended steps for follow-on efforts.« less

  5. Logistics Lessons Learned in NASA Space Flight

    NASA Technical Reports Server (NTRS)

    Evans, William A.; DeWeck, Olivier; Laufer, Deanna; Shull, Sarah

    2006-01-01

    The Vision for Space Exploration sets out a number of goals, involving both strategic and tactical objectives. These include returning the Space Shuttle to flight, completing the International Space Station, and conducting human expeditions to the Moon by 2020. Each of these goals has profound logistics implications. In the consideration of these objectives,a need for a study on NASA logistics lessons learned was recognized. The study endeavors to identify both needs for space exploration and challenges in the development of past logistics architectures, as well as in the design of space systems. This study may also be appropriately applied as guidance in the development of an integrated logistics architecture for future human missions to the Moon and Mars. This report first summarizes current logistics practices for the Space Shuttle Program (SSP) and the International Space Station (ISS) and examines the practices of manifesting, stowage, inventory tracking, waste disposal, and return logistics. The key findings of this examination are that while the current practices do have many positive aspects, there are also several shortcomings. These shortcomings include a high-level of excess complexity, redundancy of information/lack of a common database, and a large human-in-the-loop component. Later sections of this report describe the methodology and results of our work to systematically gather logistics lessons learned from past and current human spaceflight programs as well as validating these lessons through a survey of the opinions of current space logisticians. To consider the perspectives on logistics lessons, we searched several sources within NASA, including organizations with direct and indirect connections with the system flow in mission planning. We utilized crew debriefs, the John Commonsense lessons repository for the JSC Mission Operations Directorate, and the Skylab Lessons Learned. Additionally, we searched the public version of the Lessons Learned

  6. Lessons Learned in Building the Ares Projects

    NASA Technical Reports Server (NTRS)

    Sumrall, John Phil

    2010-01-01

    Since being established in 2005, the Ares Projects at Marshall Space Flight Center have been making steady progress designing, building, testing, and flying the next generation of exploration launch vehicles. Ares is committed to rebuilding crucial capabilities from the Apollo era that made the first human flights to the Moon possible, as well as incorporating the latest in computer technology and changes in management philosophy. One example of an Apollo-era practice has been giving NASA overall authority over vehicle integration activities, giving civil service engineers hands-on experience in developing rocket hardware. This knowledge and experience help make the agency a "smart buyer" of products and services. More modern practices have been added to the management tool belt to improve efficiency, cost effectiveness, and institutional knowledge, including knowledge management/capture to gain better insight into design and decision making; earned value management, where Ares won a NASA award for its practice and implementation; designing for operability; and Lean Six Sigma applications to identify and eliminate wasted time and effort. While it is important to learn technical lessons like how to fly and control unique rockets like the Ares I-X flight test vehicle, the Ares management team also has been learning important lessons about how to manage large, long-term projects.

  7. Leveraging Lesson Learning in Tactical Units

    DTIC Science & Technology

    1997-01-01

    then it may be a lesson, but as Vetock points out, determining useful lessons requires analysis. Discovery of the wrong lesson can be as bad as not...34lesson learning is a very dangerous business.൘ Distinguishing a good" lesson from a " bad " one requires experience, a good grasp of doctrine, and...section - - boasted 3 cigarette lighters, 1 bar of soap, 2 wallets, 40 bottles, 1 suspender, and 11 French toothpaste .55 49 As Vetock points out, the

  8. Marketing physical activity: lessons learned from a statewide media campaign.

    PubMed

    Peterson, Michael; Abraham, Avron; Waterfield, Allan

    2005-10-01

    Steps taken to create, implement, and initially assess a statewide physical activity social marketing campaign targeted to 18-to 30-year-olds are presented. Included is a summary demonstration of the application of the associative group analysis in formative market research and message development. Initial postcampaign questionnaire (n = 363) results indicated that 39.1% of respondents had seen the television ad, of which 31.2% indicated they intended to be more active, and 62.5% of respondents had been exposed to either the television or outdoor media ads. Lessons learned through the social marketing process including media channel effectiveness, message development and assessment, and marketing firm relationships are provided.

  9. neXtA5: accelerating annotation of articles via automated approaches in neXtProt.

    PubMed

    Mottin, Luc; Gobeill, Julien; Pasche, Emilie; Michel, Pierre-André; Cusin, Isabelle; Gaudet, Pascale; Ruch, Patrick

    2016-01-01

    The rapid increase in the number of published articles poses a challenge for curated databases to remain up-to-date. To help the scientific community and database curators deal with this issue, we have developed an application, neXtA5, which prioritizes the literature for specific curation requirements. Our system, neXtA5, is a curation service composed of three main elements. The first component is a named-entity recognition module, which annotates MEDLINE over some predefined axes. This report focuses on three axes: Diseases, the Molecular Function and Biological Process sub-ontologies of the Gene Ontology (GO). The automatic annotations are then stored in a local database, BioMed, for each annotation axis. Additional entities such as species and chemical compounds are also identified. The second component is an existing search engine, which retrieves the most relevant MEDLINE records for any given query. The third component uses the content of BioMed to generate an axis-specific ranking, which takes into account the density of named-entities as stored in the Biomed database. The two ranked lists are ultimately merged using a linear combination, which has been specifically tuned to support the annotation of each axis. The fine-tuning of the coefficients is formally reported for each axis-driven search. Compared with PubMed, which is the system used by most curators, the improvement is the following: +231% for Diseases, +236% for Molecular Functions and +3153% for Biological Process when measuring the precision of the top-returned PMID (P0 or mean reciprocal rank). The current search methods significantly improve the search effectiveness of curators for three important curation axes. Further experiments are being performed to extend the curation types, in particular protein-protein interactions, which require specific relationship extraction capabilities. In parallel, user-friendly interfaces powered with a set of JSON web services are currently being

  10. neXtA5: accelerating annotation of articles via automated approaches in neXtProt

    PubMed Central

    Mottin, Luc; Gobeill, Julien; Pasche, Emilie; Michel, Pierre-André; Cusin, Isabelle; Gaudet, Pascale; Ruch, Patrick

    2016-01-01

    The rapid increase in the number of published articles poses a challenge for curated databases to remain up-to-date. To help the scientific community and database curators deal with this issue, we have developed an application, neXtA5, which prioritizes the literature for specific curation requirements. Our system, neXtA5, is a curation service composed of three main elements. The first component is a named-entity recognition module, which annotates MEDLINE over some predefined axes. This report focuses on three axes: Diseases, the Molecular Function and Biological Process sub-ontologies of the Gene Ontology (GO). The automatic annotations are then stored in a local database, BioMed, for each annotation axis. Additional entities such as species and chemical compounds are also identified. The second component is an existing search engine, which retrieves the most relevant MEDLINE records for any given query. The third component uses the content of BioMed to generate an axis-specific ranking, which takes into account the density of named-entities as stored in the Biomed database. The two ranked lists are ultimately merged using a linear combination, which has been specifically tuned to support the annotation of each axis. The fine-tuning of the coefficients is formally reported for each axis-driven search. Compared with PubMed, which is the system used by most curators, the improvement is the following: +231% for Diseases, +236% for Molecular Functions and +3153% for Biological Process when measuring the precision of the top-returned PMID (P0 or mean reciprocal rank). The current search methods significantly improve the search effectiveness of curators for three important curation axes. Further experiments are being performed to extend the curation types, in particular protein–protein interactions, which require specific relationship extraction capabilities. In parallel, user-friendly interfaces powered with a set of JSON web services are currently being

  11. Apollo Lesson Sampler: Apollo 13 Lessons Learned

    NASA Technical Reports Server (NTRS)

    Interbartolo, Michael A.

    2008-01-01

    This CD-ROM contains a two-part case study of the Apollo 13 accident. The first lesson contains an overview of the electrical system hardware on the Apollo spacecraft, providing a context for the details of the oxygen tank explosion, and the failure chain reconstruction that led to the conditions present at the time of the accident. Given this background, the lesson then covers the tank explosion and immediate damage to the spacecraft, and the immediate response of Mission Control to what they saw. Part 2 of the lesson picks up shortly after the explosion of the oxygen tank on Apollo 13, and discusses how Mission Control gained insight to and understanding of the damage in the aftermath. Impacts to various spacecraft systems are presented, along with Mission Control's reactions and plans for in-flight recovery leading to a successful entry. Finally, post-flight vehicle changes are presented along with the lessons learned.

  12. MC-1 Engine Valves, Lessons Learned

    NASA Technical Reports Server (NTRS)

    Laszar, John

    2003-01-01

    Many lessons were learned during the development of the valves for the MC-1 engine. The purpose of this report is to focus on a variety of issues related to the engine valves and convey the lessons learned. This paper will not delve into detailed technical analysis of the components. None of the lessons learned are new or surprising, but simply reinforce the importance of addressing the details of the design early, at the component level. The Marshall Space Flight Center (MSFC), Huntsville, Alabama developed the MC-1 engine, a LOX / FW-1, 60,000 pound thrust engine. This engine was developed under the Low Cost Boost Technology office at MSFC and proved to be a very successful project for the MSFC Propulsion team and the various subcontractors working the development of the engine and its components.

  13. Value pricing pilot program : lessons learned

    DOT National Transportation Integrated Search

    2008-08-01

    This "Lessons Learned Report" provides a summary of projects sponsored by the Federal Highway Administration's (FHWA's) Congestion and Value Pricing Pilot Programs from 1991 through 2006 and draws lessons from a sample of projects with the richest an...

  14. Multimedia Principle in Teaching Lessons

    ERIC Educational Resources Information Center

    Kari Jabbour, Khayrazad

    2012-01-01

    Multimedia learning principle occurs when we create mental representations from combining text and relevant graphics into lessons. This article discusses the learning advantages that result from adding multimedia learning principle into instructions; and how to select graphics that support learning. There is a balance that instructional designers…

  15. NASA Materials Related Lessons Learned

    NASA Technical Reports Server (NTRS)

    Garcia, Danny; Gill, Paul S.; Vaughan, William W.

    2003-01-01

    Lessons Learned have been the basis for our accomplishments throughout the ages. They have been passed down from father to son, mother to daughter, teacher to pupil, and older to younger worker. Lessons Learned have also been the basis for the nation s accomplishments for more than 200 years. Both government and industry have long recognized the need to systematically document and utilize the knowledge gained from past experiences in order to avoid the repetition of failures and mishaps. Through the knowledge captured and recorded in Lessons Learned from more than 80 years of flight in the Earth s atmosphere, NASA s materials researchers are constantly working to develop stronger, lighter, and more durable materials that can withstand the challenges of space. The Agency s talented materials engineers and scientists continue to build on that rich tradition by using the knowledge and wisdom gained from past experiences to create futuristic materials and technologies that will be used in the next generation of advanced spacecraft and satellites that may one day enable mankind to land men on another planet or explore our nearest star. These same materials may also have application here on Earth to make commercial aircraft more economical to build and fly. With the explosion in technical accomplishments over the last decade, the ability to capture knowledge and have the capability to rapidly communicate this knowledge at lightning speed throughout an organization like NASA has become critical. Use of Lessons Learned is a principal component of an organizational culture committed to continuous improvement.

  16. NASA Materials Related Lessons Learned

    NASA Technical Reports Server (NTRS)

    Garcia, Danny; Gill, Paul S.; Vaughan, William W.; Parker, Nelson C. (Technical Monitor)

    2002-01-01

    Lessons Learned have been the basis for our accomplishments throughout the ages. They have been passed down from father to son, mother to daughter, teacher to pupil, and older to younger worker. Lessons Learned have also been the basis for the nation's accomplishments for more than 200 years. Both government and industry have long recognized the need to systematically document and utilize the knowledge gained from past experiences in order to avoid the repetition of failures and mishaps. Through the knowledge captured and recorded in Lessons Learned from more than 80 years of flight in the Earth's atmosphere, NASA's materials researchers are constantly working to develop stronger, lighter, and more durable materials that can withstand the challenges of space. The Agency's talented materials engineers and scientists continue to build on that rich tradition by using the knowledge and wisdom gained from past experiences to create futurist materials and technologies that will be used in the next generation of advanced spacecraft and satellites that may one day enable mankind to land men on another planet or explore our nearest star. These same materials may also have application here on Earth to make commercial aircraft more economical to build and fly. With the explosion in technical accomplishments over the last decade, the ability to capture knowledge and have the capability to rapidly communicate this knowledge at lightning speed throughout an organization like NASA has become critical. Use of Lessons Learned is a principal component of an organizational culture committed to continuous improvement.

  17. Apollo 1 Lessons Learned Show

    NASA Image and Video Library

    2017-01-27

    Mike Ciannilli, the Apollo, Challenger, Columbia Lessons Learned Program manager, welcomes participants to the Apollo 1 Lessons Learned presentation in the Training Auditorium at NASA’s Kennedy Space Center in Florida. The program's theme was "To There and Back Again." Guest panelists included Charlie Duke, former Apollo 16 astronaut and member of the Apollo 1 Emergency Egress Investigation Team; Ernie Reyes, retired, Apollo 1 senior operations engineer; and John Tribe, retired, Apollo 1 Reaction and Control System lead engineer. The event helped pay tribute to the Apollo 1 crew, Gus Grissom, Ed White II, and Roger Chaffee.

  18. Learning from Lessons: Studying the Construction of Teacher Knowledge Catalysed by Purposefully-Designed Experimental Mathematics Lessons

    ERIC Educational Resources Information Center

    Clarke, Doug; Clarke, David; Roche, Anne; Chan, Man Ching Esther

    2015-01-01

    A central premise of this project is that teachers learn from the act of teaching a lesson and that this learning is evident in the planning and teaching of a subsequent lesson. In this project, the knowledge construction of mathematics teachers was examined utilising multi-camera research techniques during lesson planning, classroom interactions…

  19. The Network Operations Control Center upgrade task: Lessons learned

    NASA Technical Reports Server (NTRS)

    Sherif, J. S.; Tran, T.-L.; Lee, S.

    1994-01-01

    This article synthesizes and describes the lessons learned from the Network Operations Control Center (NOCC) upgrade project, from the requirements phase through development and test and transfer. At the outset, the NOCC upgrade was being performed simultaneously with two other interfacing and dependent upgrades at the Signal Processing Center (SPC) and Ground Communications Facility (GCF), thereby adding a significant measure of complexity to the management and overall coordination of the development and transfer-to-operations (DTO) effort. Like other success stories, this project carried with it the traditional elements of top management support and exceptional dedication of cognizant personnel. Additionally, there were several NOCC-specific reasons for success, such as end-to-end system engineering, adoption of open-system architecture, thorough requirements management, and use of appropriate off-the-shelf technologies. On the other hand, there were several difficulties, such as ill-defined external interfaces, transition issues caused by new communications protocols, ambivalent use of two sets of policies and standards, and mistailoring of the new JPL management standard (due to the lack of practical guidelines). This article highlights the key lessons learned, as a means of constructive suggestions for the benefit of future projects.

  20. Historical problem areas: Lessons learned for expendable and reusable vehicle propulsion systems

    NASA Technical Reports Server (NTRS)

    Fester, Dale A.

    1991-01-01

    The following subject areas are covered: expendable launch vehicle lessons learned, upper stage/transfer vehicle lessons learned, shuttle systems - reuse, and reusable system issues and lessons learned.

  1. DT&E Forum for Best Practices and Lessons Learned

    DTIC Science & Technology

    2013-05-01

    E A N A L Y S E S IDA Paper P-4975 DT&E Forum for Best Practices and Lessons Learned L. B. Scheiber, Project Leader...and accessing from the DT&E Forum website. A. Collection of Lessons Learned and Best Practices We began the effort by reviewing approximately 30...Forum’s Home Page 1. Searching for BPLL Documents The DT&E Forum website contains DT&E Best Practice and Lessons Learned (BPLL) documents along with the

  2. Lessons Learned from JTA Tester Safety Studies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    R. L. Bierbaum

    2001-05-01

    EP401575, Issue C, calls out a requirement to perform safety studies for testers that are used to accept Joint Test Assembly (JTA) product at Pantex (Reference 1). The underlying motivation is to ensure that personnel hazards due to inadvertent initiation of electro-explosive devices (EEDs) during JTA testing are understood and minimized. Studies have been performed on the B61-7/11 JTA, B61-3/4/10 JTA, B83 JTA, and W76 Type 2F testers at Pantex (References 2-5). Each of these studies includes an examination of the relevant Pantex tester as well as the instrumentation and War Reserve (WR) hardware. In performing these analyses, several themesmore » have emerged that could be useful for the Phase 6.3 design efforts for the weapons, the associated instrumentation, and the JTA testers. This report summarizes the lessons learned from these studies. Note that in some cases, the recommendations provided below to enhance safety during JTA testing operations (e.g., adding isolation resistors in the monitoring lines) may result in a reliability degradation or other surety impact. Thus it is important to consider these lessons learned in the context of the overall design and to make tradeoffs in light of the integrated surety objectives. The lessons learned are listed in five different categories, summarized as: (1) Instrumentation considerations; (2) WR design considerations; (3) Tester considerations; (4) Administrative procedures during JTA assembly; and (5) Administrative procedures prior to and during JTA testing. The first three focus on minimizing the probability of inadvertent application of power to EED initiation lines due to component, connector, and assembly failures. The last two describe procedural steps that can be taken at Pantex to either minimize the risk (e.g., by ensuring that tester power supplies cannot supply excessive power to the unit under test) or to mitigate the consequences of unexpected EED initiation (e.g., by instructing test operators to

  3. Summary of Planned Implementation for the HTGR Lessons Learned Applicable to the NGNP

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ian Mckirdy

    2011-09-01

    This document presents a reconciliation of the lessons learned during a 2010 comprehensive evaluation of pertinent lessons learned from past and present high temperature gas-cooled reactors that apply to the Next Generation Nuclear Plant Project along with current and planned activities. The data used are from the latest Idaho National Laboratory research and development plans, the conceptual design report from General Atomics, and the pebble bed reactor technology readiness study from AREVA. Only those lessons related to the structures, systems, and components of the Next Generation Nuclear Plant (NGNP), as documented in the recently updated lessons learned report are addressed.more » These reconciliations are ordered according to plant area, followed by the affected system, subsystem, or component; lesson learned; and finally an NGNP implementation statement. This report (1) provides cross references to the original lessons learned document, (2) describes the lesson learned, (3) provides the current NGNP implementation status with design data needs associated with the lesson learned, (4) identifies the research and development being performed related to the lesson learned, and (5) summarizes with a status of how the lesson learned has been addressed by the NGNP Project.« less

  4. Brentwood Lessons Learned Project Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rivkin, Carl H.; Caton, Melanie C.; Ainscough, Christopher D.

    The purpose of this report is to document lessons learned in the installation of the hydrogen fueling station at the National Park Service Brentwood site in Washington, D.C., to help further the deployment of hydrogen infrastructure required to support hydrogen and other fuel cell technologies. Hydrogen fueling is the most difficult infrastructure component to build and permit. Hydrogen fueling can include augmenting hydrogen fueling capability to existing conventional fuel fueling stations as well as building brand new hydrogen fueling stations. This report was produced as part of the Brentwood Lessons Learned project. The project consisted of transplanting an existing modularmore » hydrogen fueling station from Connecticut to the National Park Service Brentwood site. This relocation required design and construction at the Brentwood site to accommodate the existing station design as well as installation and validation of the updated station. One of the most important lessons learned was that simply moving an existing modular station to an operating site was not necessarily straight-forward - performing the relocation required significant effort and cost. The station has to function at the selected operating site and this functionality requires a power supply, building supports connecting to an existing alarm system, electrical grounding and lighting, providing nitrogen for purging, and providing deionized water if an electrolyzer is part of the station package. Most importantly, the station has to fit into the existing site both spatially and operationally and not disrupt existing operations at the site. All of this coordination and integration requires logistical planning and project management. The idea that a hydrogen fueling station can be simply dropped onto a site and made immediately operational is generally not realistic. Other important lessons learned include that delineating the boundaries of the multiple jurisdictions that have authority over a

  5. Orbiter Water Dump Nozzles Redesign Lessons Learned

    NASA Technical Reports Server (NTRS)

    Rotter, Hank

    2017-01-01

    Hank Rotter, NASA Technical Fellow for Environmental Control and Life Support System, will provide the causes and lessons learned for the two Space Shuttle Orbiter water dump icicles that formed on the side of the Orbiter. He will present the root causes and the criticality of these icicles, along with the redesign of the water dump nozzles and lessons learned during the redesign phase.

  6. Lessons learned from first year cistern monitoring in Camden ...

    EPA Pesticide Factsheets

    Invited panelist for Webinar 08/16/2016 by Office of Water : Lessons Learned from Past Green Infrastructure Projects Invited panelist for Webinar 08/16/2016 by Office of Water : Lessons Learned from Past Green Infrastructure Projects

  7. Lessons learned from case studies of inhalation exposures of workers to radioactive aerosols

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoover, M.D.; Fencl, A.F.; Newton, G.J.

    1995-12-01

    Various Department of Energy requirements, rules, and orders mandate that lessons learned be identified, evaluated, shared, and incorporated into current practices. The recently issued, nonmandatory DOE standard for Development of DOE Lessons Learned Program states that a DOE-wide lessons learned program will {open_quotes}help to prevent recurrences of negative experiences, highlight best practices, and spotlight innovative ways to solve problems or perform work more safely, efficiently, and cost effectively.{close_quotes} Additional information about the lessons learned program is contained in the recently issued DOE handbook on Implementing U.S. Department of Energy Lessons Learned Programs and in October 1995 DOE SAfety Notice onmore » Lessons Learned Programs. This report summarizes work in progress at ITRI to identify lessons learned for worker exposures to radioactive aerosols, and describes how this work will be incorporated into the DOE lessons learned program, including a new technical guide for measuring, modeling, and mitigating airborne radioactive particles. Follow-on work is focusing on preparation of {open_quotes}lessons learned{close_quotes} training materials for facility designers, managers, health protection professionals, line supervisors, and workers.« less

  8. Lessons learned from facilitating the state and tribal government working group

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kurstedt, H.A. Jr.

    1994-12-31

    Thirteen lessons learned from my experience in facilitating the State and Tribal Government Working Group for the U.S. Department of Energy have been identified. The conceptual base for supporting the veracity of each lesson has been developed and the lessons are believed to be transferable to any stakeholder group. The crux of stakeholder group success if the two-directional, two-mode empowerment required in this case. Most of the lessons learned deal with the scope of that empowerment. A few of the lessons learned deal with the operations of the group.

  9. NASA's Lessons Learned and Technical Standards: A Logical Marriage

    NASA Technical Reports Server (NTRS)

    Gill, Paul; Vaughan, William W.; Garcia, Danny; Weinstein, Richard

    2001-01-01

    Lessons Learned have been the basis for our accomplishments throughout the ages. They have been passed down from father to son, mother to daughter, teacher to pupil, and older to younger worker. Lessons Learned have also been the basis for NASA's accomplishments for more than forty years. Both government and industry have long recognized the need to systematically document and utilize the knowledge gained from past experiences in order to avoid the repetition of failures and mishaps. Lessons Learned have formed the foundation for discoveries, inventions, improvements, textbooks, and Technical Standards.

  10. The Oklahoma bombing. Lessons learned.

    PubMed

    Anteau, C M; Williams, L A

    1997-06-01

    The Oklahoma City bombing experience in April of 1995 provided a unique opportunity to test the effectiveness of an existing disaster plan. The critical care nurses at Columbia Presbyterian Hospital learned valuable lessons about managing intense activity, equipment and supplies, staffing resources, and visitor issues. The degree to which the bombing affected the emotional state of personnel was unanticipated, and leaders learned that critical stress management interventions should be included in every emergency preparedness plan. Additionally, recommendations include using runners for communication; assigning specific roles (supplies, staffing, triage); keeping additional staff in reserve for shift relief; ensuring ample hospital staff members are available to coordinate visitors and media; and setting up record systems to preserve continuity. The unique lessons learned as a result of this terrorist attack can be used by other critical care nurses to understand and refine disaster plans.

  11. Constellation Program: Lessons Learned. Volume 1; Executive Summary

    NASA Technical Reports Server (NTRS)

    Rhatigan, Jennifer L. (Editor)

    2011-01-01

    This document (Volume I) provides an executive summary of the lessons learned from the Constellation Program. A companion Volume II provides more detailed analyses for those seeking further insight and information. In this volume, Section 1.0 introduces the approach in preparing and organizing the content to enable rapid assimilation of the lessons. Section 2.0 describes the contextual framework in which the Constellation Program was formulated and functioned that is necessary to understand most of the lessons. Context of a former program may seem irrelevant in the heady days of new program formulation. However, readers should take some time to understand the context. Many of the lessons would be different in a different context, so the reader should reflect on the similarities and differences in his or her current circumstances. Section 3.0 summarizes key findings developed from the significant lessons learned at the program level that appear in Section 4.0. Readers can use the key findings in Section 3.0 to peruse for particular topics, and will find more supporting detail and analyses in Section 4.0 in a topical format. Appendix A contains a white paper describing the Constellation Program formulation that may be of use to readers wanting more context or background information. The reader will no doubt recognize some very similar themes from previous lessons learned, blue-ribbon committee reviews, National Academy reviews, and advisory panel reviews for this and other large-scale human spaceflight programs; including Apollo, Space Shuttle, Shuttle/Mir, and the ISS. This could represent an inability to learn lessons from previous generations; however, it is more likely that similar challenges persist in the Agency structure and approach to program formulation, budget advocacy, and management. Perhaps the greatest value of these Constellation lessons learned can be found in viewing them in context with these previous efforts to guide and advise the Agency and its

  12. Planning and scheduling lessons learned study, executive summary

    NASA Technical Reports Server (NTRS)

    Robinson, Toni

    1990-01-01

    The study was performed to document the lessons on planning and scheduling activities for a number of missions and institutional facilities in such a way that they can be applied to future missions; to provide recommendations to both projects and Code 500 that will improve the end-to-end planning and scheduling process; and to identify what, if any, mission characteristics might be related to certain lessons learned. The results are a series of recommendations of both a managerial and technical nature related to the underlying lessons learned.

  13. Learning from Lessons: Teachers' Insights and Intended Actions Arising from Their Learning about Student Thinking

    ERIC Educational Resources Information Center

    Roche, Anne; Clarke, Doug; Clarke, David; Chan, Man Ching Esther

    2016-01-01

    A central premise of this project is that teachers learn from the act of teaching a lesson and that this learning is evident in the planning and teaching of a subsequent lesson. We are studying the knowledge construction of mathematics teachers utilising multi-camera research techniques during lesson planning, classroom interactions and…

  14. The lift-fan aircraft: Lessons learned

    NASA Technical Reports Server (NTRS)

    Deckert, Wallace H.

    1995-01-01

    This report summarizes the highlights and results of a workshop held at NASA Ames Research Center in October 1992. The objective of the workshop was a thorough review of the lessons learned from past research on lift fans, and lift-fan aircraft, models, designs, and components. The scope included conceptual design studies, wind tunnel investigations, propulsion systems components, piloted simulation, flight of aircraft such as the SV-5A and SV-5B and a recent lift-fan aircraft development project. The report includes a brief summary of five technical presentations that addressed the subject The Lift-Fan Aircraft: Lessons Learned.

  15. Providing Community Education: Lessons Learned from Native Patient Navigators

    PubMed Central

    Burhansstipanov, Linda; Krebs, Linda U.; Harjo, Lisa; Watanabe-Galloway, Shinobu; Pingatore, Noel; Isham, Debra; Duran, Florence Tinka; Denny, Loretta; Lindstrom, Denise; Crawford, Kim

    2014-01-01

    Native Navigators and the Cancer Continuum (NNACC) was a community-based participatory research study among five American Indian organizations. The intervention required lay Native Patient Navigators (NPNs) to implement and evaluate community education workshops in their local settings. Community education was a new role for the NPNs and resulted in many lessons learned. NPNs met quarterly from 2008 through 2013 and shared lessons learned with one another and with the administrative team. In July 2012, the NPNs prioritized lessons learned throughout the study that were specific to implementing the education intervention. These were shared to help other navigators who may be including community education within their scope of work. The NPNs identified eight lessons learned that can be divided into three categories: NPN education and training, workshop content and presentation, and workshop logistics and problem-solving. A ninth overarching lesson for the entire NNACC study identified meeting community needs as an avenue for success. This project was successful due to the diligence of the NPNs in understanding their communities’ needs and striving to meet them through education workshops. Nine lessons were identified by the NPNs who provided community education through the NNACC project. Most are relevant to all patient navigators, regardless of patient population, who are incorporating public education into navigation services. Due to their intervention and budget implications, many of these lessons also are relevant to those who are developing navigation research. PMID:25087698

  16. Lessons Learned Study Final Report for the Exploration Systems Mission Directorate

    NASA Technical Reports Server (NTRS)

    Van Laak, Jim; Brumfield, M. Larry; Moore, Arlene A.; Anderson, Brooke; Dempsey, Jim; Gifford, Bob; Holloway, Chip; Johnson, Keith

    2004-01-01

    This report is the final product of a 90-day study performed for the Exploration Systems Mission Directorate. The study was to assemble lessons NASA has learned from previous programs that could help the Exploration Systems Mission Directorate pursue the Exploration vision. It focuses on those lessons that should have the greatest significance to the Directorate during the formulation of program and mission plans. The study team reviewed a large number of lessons learned reports and data bases, including the Columbia Accident Investigation Board and Rogers Commission reports on the Shuttle accidents, accident reports from robotic space flight systems, and a number of management reviews by the Defense Sciences Board, Government Accountability Office, and others. The consistency of the lessons, findings, and recommendations validate the adequacy of the data set. In addition to reviewing existing databases, a series of workshops was held at each of the NASA centers and headquarters that included senior managers from the current workforce as well as retirees. The full text of the workshop reports is included in Appendix A. A lessons learned website was opened up to permit current and retired NASA personnel and on-site contractors to input additional lessons as they arise. These new lessons, when of appropriate quality and relevance, will be brought to the attention of managers. The report consists of four parts: Part 1 provides a small set of lessons, called the Executive Lessons Learned, that represent critical lessons that the Exploration Systems Mission Directorate should act on immediately. This set of Executive Lessons and their supporting rationale have been reviewed at length and fully endorsed by a team of distinguished NASA alumni; Part 2 contains a larger set of lessons, called the Selected Lessons Learned, which have been chosen from the lessons database and center workshop reports on the basis of their specific significance and relevance to the near

  17. Teacher Responses to Learning Cycle Science Lessons for Early Childhood Education

    NASA Astrophysics Data System (ADS)

    Kraemer, Emily N.

    Three learning cycle science lessons were developed for preschoolers in an early childhood children's center in Costa Mesa, California. The lessons were field tested by both novice and experienced teachers with children ranging from three to five years old. Teachers were then interviewed informally to collect feedback on the structure and flow the lessons. The feedback was encouraging remarks towards the use of learning cycle science lessons for early childhood educators. Adjustments were made to the lessons based on teacher feedback. The lessons and their implications for preschool education are discussed.

  18. Higher Education ERP: Lessons Learned.

    ERIC Educational Resources Information Center

    Swartz, Dave; Orgill, Ken

    2001-01-01

    Shares experiences and lessons learned by chief information officers of large universities about enterprise resource planning (ERP). Specifically, provides a framework for approaching an ERP that could save universities millions of dollars. (EV)

  19. Extension Learning Exchange: Lessons from Nicaragua

    ERIC Educational Resources Information Center

    Treadwell, Paul; Lachapelle, Paul; Howe, Rod

    2013-01-01

    There is a clear need to support global professional development, international education, and collaborative learning opportunities in Extension. The program described here established an international learning exchange in Nicaragua to lead to global professional development and future international collaboration. The primary lessons and outcomes…

  20. After-Action Reports: Capturing Lessons Learned and Identifying Areas for Improvement. Lessons Learned from School Crises and Emergencies. Volume 2, Issue 1, 2007

    ERIC Educational Resources Information Center

    US Department of Education, 2007

    2007-01-01

    "Lessons Learned" is a series of publications that are a brief recounting of actual school emergencies and crises. This issue of "Lessons Learned" addresses after-action reports, which are an integral part of the emergency preparedness planning continuum and support effective crisis response. After-action reports have a threefold purpose. They…

  1. Solid-State Lighting: Early Lessons Learned on the Way to Market

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sandahl, Linda J.; Cort, Katherine A.; Gordon, Kelly L.

    2013-12-31

    The purpose of this report is to document early challenges and lessons learned in the solid-state lighting (SSL) market development as part of the DOE’s SSL Program efforts to continually evaluate market progress in this area. This report summarizes early actions taken by DOE and others to avoid potential problems anticipated based on lessons learned from the market introduction of compact fluorescent lamps and identifies issues, challenges, and new lessons that have been learned in the early stages of the SSL market introduction. This study identifies and characterizes12 key lessons that have been distilled from DOE SSL program results.

  2. Online Conferencing: Lessons Learned.

    ERIC Educational Resources Information Center

    Green, Lyndsay

    This guide summarizes lessons learned from the author's experience of organizing and moderating five non-pedagogical online conferences that use World Wide Web-based conferencing software, whether synchronous or asynchronous. Seven sections cover the following topics: (1) the pros and cons of online conferencing; (2) setting objectives; (3)…

  3. Research Administration: Lessons Learned.

    ERIC Educational Resources Information Center

    Dummer, George H.

    1995-01-01

    The ways in which accountability issues have affected federal-university relationships, particularly in the area of academic research, are examined. Lessons university administrators have learned since issuance of Office of Management and Budget Circular A-21 in 1958, Congressional hearings on the operations of the National Institutes of Health…

  4. Lesson Closure: An Important Piece of the Student Learning Puzzle

    ERIC Educational Resources Information Center

    Ganske, Kathy

    2017-01-01

    As we seek ways to improve literacy teaching and learning, we need to be careful not to overlook lesson closure as an opportunity to solidify student learning. This Teaching Tip describes the importance of taking time at the ends of lessons, days, and weeks to revisit what students have learned as a means for helping them synthesize and assimilate…

  5. Improving the quality of learning in science through optimization of lesson study for learning community

    NASA Astrophysics Data System (ADS)

    Setyaningsih, S.

    2018-03-01

    Lesson Study for Learning Community is one of lecturer profession building system through collaborative and continuous learning study based on the principles of openness, collegiality, and mutual learning to build learning community in order to form professional learning community. To achieve the above, we need a strategy and learning method with specific subscription technique. This paper provides a description of how the quality of learning in the field of science can be improved by implementing strategies and methods accordingly, namely by applying lesson study for learning community optimally. Initially this research was focused on the study of instructional techniques. Learning method used is learning model Contextual teaching and Learning (CTL) and model of Problem Based Learning (PBL). The results showed that there was a significant increase in competence, attitudes, and psychomotor in the four study programs that were modelled. Therefore, it can be concluded that the implementation of learning strategies in Lesson study for Learning Community is needed to be used to improve the competence, attitude and psychomotor of science students.

  6. The JPEG XT suite of standards: status and future plans

    NASA Astrophysics Data System (ADS)

    Richter, Thomas; Bruylants, Tim; Schelkens, Peter; Ebrahimi, Touradj

    2015-09-01

    The JPEG standard has known an enormous market adoption. Daily, billions of pictures are created, stored and exchanged in this format. The JPEG committee acknowledges this success and spends continued efforts in maintaining and expanding the standard specifications. JPEG XT is a standardization effort targeting the extension of the JPEG features by enabling support for high dynamic range imaging, lossless and near-lossless coding, and alpha channel coding, while also guaranteeing backward and forward compatibility with the JPEG legacy format. This paper gives an overview of the current status of the JPEG XT standards suite. It discusses the JPEG legacy specification, and details how higher dynamic range support is facilitated both for integer and floating-point color representations. The paper shows how JPEG XT's support for lossless and near-lossless coding of low and high dynamic range images is achieved in combination with backward compatibility to JPEG legacy. In addition, the extensible boxed-based JPEG XT file format on which all following and future extensions of JPEG will be based is introduced. This paper also details how the lossy and lossless representations of alpha channels are supported to allow coding transparency information and arbitrarily shaped images. Finally, we conclude by giving prospects on upcoming JPEG standardization initiative JPEG Privacy & Security, and a number of other possible extensions in JPEG XT.

  7. Learning to Lead, Leading to Learn: How Facilitators Learn to Lead Lesson Study

    ERIC Educational Resources Information Center

    Lewis, Jennifer M.

    2016-01-01

    This article presents research on how teacher developers in the United States learn to conduct lesson study. Although the practice of lesson study is expanding rapidly in the US, high-quality implementation requires skilled facilitation. In contexts such as the United States where this form of professional development is relatively novel, few…

  8. LDCM Ground System. Network Lesson Learned

    NASA Technical Reports Server (NTRS)

    Gal-Edd, Jonathan

    2010-01-01

    This slide presentation reviews the Landsat Data Continuity Mission (LDCM) and the lessons learned in implementing the network that was assembled to allow for the acquisition, archiving and distribution of the data from the Landsat mission. The objective of the LDCM is to continue the acquisition, archiving, and distribution of moderate-resolution multispectral imagery affording global, synoptic, and repetitive coverage of the earth's land surface at a scale where natural and human-induced changes can be detected, differentiated, characterized, and monitored over time. It includes a review of the ground network, including a block diagram of the ground network elements (GNE) and a review of the RF design and testing. Also included is a listing of the lessons learned.

  9. DSCOVR Contamination Lessons Learned

    NASA Technical Reports Server (NTRS)

    Graziani, Larissa

    2015-01-01

    The Triana observatory was built at NASA GSFC in the late 1990's, then placed into storage. After approximately ten years it was removed from storage and repurposed as the Deep Space Climate Observatory (DSCOVR). This presentation outlines the contamination control program lessons learned during the integration, test and launch of DSCOVR.

  10. Selected Lessons Learned in Space Shuttle Orbiter Propulsion and Power Subsystems

    NASA Technical Reports Server (NTRS)

    Hernandez, Francisco J.; Martinez, Hugo; Ryan, Abigail; Westover, Shayne; Davies, Frank

    2011-01-01

    Over its 30 years of space flight history, plus the nearly 10 years of design, development test and evaluation, the Space Shuttle Orbiter is full of lessons learned in all of its numerous and complex subsystems. In the current paper, only selected lessons learned in the areas of the Orbiter propulsion and power subsystems will be described. The particular Orbiter subsystems include: Auxiliary Power Unit (APU), Hydraulics and Water Spray Boiler (WSB), Mechanical Flight Controls, Main Propulsion System (MPS), Fuel Cells and Power Reactant and Storage Devices (PRSD), Orbital Maneuvering System (OMS), Reaction Control System (RCS), Electrical Power Distribution (EPDC), electrical wiring and pyrotechnics. Given the complexity and extensive history of each of these subsystems, and the limited scope of this paper, it is impossible to include most of the lessons learned; instead the attempt will be to present a selected few or key lessons, in the judgment of the authors. Each subsystem is presented separate, beginning with an overview of the hardware and their function, a short description of a few historical problems and their lessons, followed by a more comprehensive table listing of the major subsystem problems and lessons. These tables serve as a quick reference for lessons learned in each subsystem. In addition, this paper will establish common lessons across subsystems as well as concentrate on those lessons which are deemed to have the highest applicability to future space flight programs.

  11. Lift-fan aircraft: Lessons learned-the pilot's perspective

    NASA Technical Reports Server (NTRS)

    Gerdes, Ronald M.

    1993-01-01

    This paper is written from an engineering test pilot's point of view. Its purpose is to present lift-fan 'lessons learned' from the perspective of first-hand experience accumulated during the period 1962 through 1988 while flight testing vertical/short take-off and landing (V/STOL) experimental aircraft and evaluating piloted engineering simulations of promising V/STOL concepts. Specifically, the scope of the discussions to follow is primarily based upon a critical review of the writer's personal accounts of 30 hours of XV-5A/B and 2 hours of X-14A flight testing as well as a limited simulator evaluation of the Grumman Design 755 lift-fan aircraft. Opinions of other test pilots who flew these aircraft and the aircraft simulator are also included and supplement the writer's comments. Furthermore, the lessons learned are presented from the perspective of the writer's flying experience: 10,000 hours in 100 fixed- and rotary-wing aircraft including 330 hours in 5 experimental V/STOL research aircraft. The paper is organized to present to the reader a clear picture of lift-fan lessons learned from three distinct points of view in order to facilitate application of the lesson principles to future designs. Lessons learned are first discussed with respect to case histories of specific flight and simulator investigations. These principles are then organized and restated with respect to four selected design criteria categories in Appendix I. Lastly, Appendix Il is a discussion of the design of a hypothetical supersonic short take-off vertical landing (STOVL) fighter/attack aircraft.

  12. Commercial Orbital Transportation Services (COTS) Program Lessons Learned

    NASA Technical Reports Server (NTRS)

    Lindenmoyer, Alan; Horkachuck, Mike; Shotwell, Gwynne; Manners, Bruce; Culbertson, Frank

    2015-01-01

    This report has been developed by the National Aeronautics and Space Administration (NASA) Human Exploration and Operations Mission Directorate (HEOMD) Risk Management team in close coordination with the COTS Program. This document provides a point-in-time, cumulative, summary of actionable key lessons learned derived from the design project. Lessons learned invariably address challenges and risks and the way in which these areas have been addressed. Accordingly the risk management thread is woven throughout the document.

  13. Communication and Collaboration During Natural Disasters: The Lessons Learned From Past Experience. Lessons Learned From School Crises and Emergencies, Volume 3, Issue 2, 2008

    ERIC Educational Resources Information Center

    US Department of Education, 2008

    2008-01-01

    "Lessons Learned" is a series of publications that are a brief recounting of actual school emergencies and crises. This "Lessons Learned" issue focuses on the response and recovery efforts to wildfires by the San Diego County Office of Education (SDCOE) and its school and community partners. Natural disasters such as floods,…

  14. Development of potent anti-infective agents from Silurana tropicalis: conformational analysis of the amphipathic, alpha-helical antimicrobial peptide XT-7 and its non-haemolytic analogue [G4K]XT-7.

    PubMed

    Subasinghage, Anusha P; Conlon, J Michael; Hewage, Chandralal M

    2010-04-01

    Peptide XT-7 (GLLGP(5)LLKIA(10)AKVGS(15)NLL.NH(2)) is a cationic, leucine-rich peptide, first isolated from skin secretions of the frog, Silurana tropicalis (Pipidae). The peptide shows potent, broad-spectrum antimicrobial activity but its therapeutic potential is limited by haemolytic activity (LC(50)=140 microM). The analogue [G4K]XT-7, however, retains potent antimicrobial activity but is non-haemolytic (LC(50)>500 microM). In order to elucidate the molecular basis for this difference in properties, the three dimensional structures of XT-7 and the analogue have been investigated by proton NMR spectroscopy and molecular modelling. In aqueous solution, both peptides lack secondary structure. In a 2,2,2-trifluoroethanol (TFE-d(3))-H(2)O mixed solvent system, XT-7 is characterised by a right handed alpha-helical conformation between residues Leu(3) and Leu(17) whereas [G4K]XT-7 adopts a more restricted alpha-helical conformation between residues Leu(6) and Leu(17). A similar conformation for XT-7 in 1,2-dihexanoyl-sn-glycero-3-phosphocholine (DHPC) micellular media was observed with a helical segment between Leu(3) and Leu(17). However, differences in side chain orientations restricting the hydrophilic residues to a smaller patch resulted in an increased hydrophobic surface relative to the conformation in TFE-H(2)O. Molecular modelling of the structures obtained in our study demonstrates the amphipathic character of the helical segments. It is proposed that the marked decrease in haemolytic activity produced by the substitution Gly(4)-->Lys in XT-7 arises from a decrease in both helicity and hydrophobicity. These studies may facilitate the development of potent but non-toxic anti-infective agents based upon the structure of XT-7. Copyright 2009 Elsevier B.V. All rights reserved.

  15. Lessons Learned from the Advanced Topographic Laser Altimeter System

    NASA Technical Reports Server (NTRS)

    Garrison, Matt; Patel, Deepak; Bradshaw, Heather; Robinson, Frank; Neuberger, Dave

    2016-01-01

    The ICESat-2 Advanced Topographic Laser Altimeter System (ATLAS) instrument is an upcoming Earth Science mission focusing on the effects of climate change. The flight instrument passed all environmental testing at GSFC (Goddard Space Flight Center) and is now ready to be shipped to the spacecraft vendor for integration and testing. This presentation walks through the lessons learned from design, hardware, analysis and testing perspective. ATLAS lessons learned include general thermal design, analysis, hardware, and testing issues as well as lessons specific to laser systems, two-phase thermal control, and optical assemblies with precision alignment requirements.

  16. Lessons Learned: The Pale Horse Bioterrorism Response Exercise

    DTIC Science & Technology

    2003-12-01

    to define what the professional and personal liability of private health care providers is for Table 1. Participants in Pale Horse Tabletop Planning...Lessons Learned Lessons Learned: The “Pale Horse ” Bioterrorism Response Exercise Col. David Jarrett, MD, FACEP The city of San Antonio, Texas, and...Editorial, see p. 98 And I looked, and behold, a pale horse : and his name that sat on him was Death, and Hell followed with him. Book of Revelation 6:8 I n

  17. Lessons learned for improving spacecraft ground operations

    NASA Astrophysics Data System (ADS)

    Bell, Michael; Stambolian, Damon; Henderson, Gena

    NASA has a unique history in processing the Space Shuttle fleet for launches. Some of this experience has been captured in the NASA Lessons Learned Information System (LLIS). This tool provides a convenient way for design engineers to review lessons from the past to prevent problems from reoccurring and incorporate positive lessons in new designs. At the Kennedy Space Center, the LLIS is being used to design ground support equipment for the next generation of launch and crewed vehicles. This paper describes the LLIS process and offers some examples.

  18. Lessons Learned for Improving Spacecraft Ground Operations

    NASA Technical Reports Server (NTRS)

    Bell, Michael A.; Stambolian, Damon B.; Henderson, Gena M.

    2012-01-01

    NASA has a unique history in processing the Space Shuttle fleet for launches. Some of this experience has been captured in the NASA Lessons Learned Information System (LLIS). This tool provides a convenient way for design engineers to review lessons from the past to prevent problems from reoccurring and incorporate positive lessons in new designs. At the Kennedy Space Center, the LLIS is being used to design ground support equipment for the next generation of launch and crewed vehicles. This paper describes the LLIS process and offers some examples.

  19. EMR Database Upgrade from MUMPS to CACHE: Lessons Learned.

    PubMed

    Alotaibi, Abduallah; Emshary, Mshary; Househ, Mowafa

    2014-01-01

    Over the past few years, Saudi hospitals have been implementing and upgrading Electronic Medical Record Systems (EMRs) to ensure secure data transfer and exchange between EMRs.This paper focuses on the process and lessons learned in upgrading the MUMPS database to a the newer Caché database to ensure the integrity of electronic data transfer within a local Saudi hospital. This paper examines the steps taken by the departments concerned, their action plans and how the change process was managed. Results show that user satisfaction was achieved after the upgrade was completed. The system was stable and offered better healthcare quality to patients as a result of the data exchange. Hardware infrastructure upgrades improved scalability and software upgrades to Caché improved stability. The overall performance was enhanced and new functions were added (CPOE) during the upgrades. The essons learned were: 1) Involve higher management; 2) Research multiple solutions available in the market; 3) Plan for a variety of implementation scenarios.

  20. Lessons Learned and Technical Standards: A Logical Marriage for Future Space Systems Design

    NASA Technical Reports Server (NTRS)

    Gill, Paul S.; Garcia, Danny; Vaughan, William W.; Parker, Nelson C. (Technical Monitor)

    2002-01-01

    A comprehensive database of engineering lessons learned that corresponds with relevant technical standards will be a valuable asset to those engaged in studies on future space vehicle developments, especially for structures, materials, propulsion, control, operations and associated elements. In addition, this will enable the capturing of technology developments applicable to the design, development, and operation of future space vehicles as planned in the Space Launch Initiative. Using the time-honored tradition of passing on lessons learned while utilizing the newest information technology, NASA has launched an intensive effort to link lessons learned acquired through various Internet databases with applicable technical standards. This paper will discuss the importance of lessons learned, the difficulty in finding relevant lessons learned while engaged in a space vehicle development, and the new NASA effort to relate them to technical standards that can help alleviate this difficulty.

  1. Lesson Plans: Road Maps for the Active Learning Classroom.

    PubMed

    Moore-Cox, Annie

    2017-11-01

    Lesson planning is a documentation process used extensively in education from kindergarten through 12th grade, but rarely in higher education, including undergraduate, prelicensure nursing education. Lesson plans help teachers plan what will happen during a class period from moment to moment. Trends in nursing education, such as the incorporation of active learning strategies in the classroom, make lesson plans a timely addition to the nurse educator's toolkit. This article describes the components of a lesson plan and offers an author-developed template for use in nursing education. Using the template helps nurse educators map out activities for all class participants, such as students, student pairs and teams, and faculty. The lesson plan enables faculty to plot out the many dynamic components of an active learning class period. It also serves as a road map for subsequent faculty, which is an important feature as the profession faces a wave of retirements in the coming decade. [J Nurs Educ. 2017;56(11):697-700.]. Copyright 2017, SLACK Incorporated.

  2. Solid-State Lighting. Early Lessons Learned on the Way to Market

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sandahl, L. J.; Cort, K. A.; Gordon, K. L.

    2014-01-01

    Analysis of issues and lessons learned during the early stages of solid-state lighting market introduction in the U.S., which also summarizes early actions taken to avoid potential problems anticipated based on lessons learned from the market introduction of compact fluorescent lamps.

  3. Reflections on Designing a MPA Service-Learning Component: Lessons Learned

    ERIC Educational Resources Information Center

    Roman, Alexandru V.

    2015-01-01

    This article provides the "lessons learned" from the experience of redesigning two sections (face-to-face and online) of a core master of public administration class as a service-learning course. The suggestions made here can be traced to the entire process of the project, from the "seed idea" through its conceptualization and…

  4. Blended learning: strengths, challenges, and lessons learned in an interprofessional training program.

    PubMed

    Lotrecchiano, G R; McDonald, P L; Lyons, L; Long, T; Zajicek-Farber, M

    2013-11-01

    This field report outlines the goals of providing a blended learning model for an interdisciplinary training program for healthcare professionals who care for children with disabilities. The curriculum blended traditional face-to-face or on-site learning with integrated online interactive instruction. Credit earning and audited graduate level online coursework, community engagement experiences, and on-site training with maternal and child health community engagement opportunities were blended into a cohesive program. The training approach emphasized adult learning principles in different environmental contexts integrating multiple components of the Leadership Education in Neurodevelopmental and Related Disabilities Program. This paper describes the key principles adopted for this blended approach and the accomplishments, challenges, and lessons learned. The discussion offers examples from training content, material gathered through yearly program evaluation, as well as university course evaluations. The lessons learned consider the process and the implications for the role of blended learning in this type of training program with suggestions for future development and adoption by other programs.

  5. Implementing a lessons learned process at Sandia National Laboratories

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fosshage, Erik D.; Drewien, Celeste A.; Eras, Kenneth

    2016-01-01

    The Lessons Learned Process Improvement Team was tasked to gain an understanding of the existing lessons learned environment within the major programs at Sandia National Laboratories, identify opportunities for improvement in that environment as compared to desired attributes, propose alternative implementations to address existing inefficiencies, perform qualitative evaluations of alternative implementations, and recommend one or more near-term activities for prototyping and/or implementation. This report documents the work and findings of the team.

  6. MSL Lessons Learned and Knowledge Capture

    NASA Technical Reports Server (NTRS)

    Buxbaum, Karen L.

    2012-01-01

    The Mars Program has recently been informed of the Planetary Protection Subcommittee (PPS) recommendation, which was endorsed by the NAC, concerning Mars Science Lab (MSL) lessons learned and knowledge capture. The Mars Program has not had an opportunity to consider any decisions specific to the PPS recommendation. Some of the activities recommended by the PPS would involve members of the MSL flight team who are focused on cruise, entry descent & landing, and early surface operations; those activities would have to wait. Members of the MSL planetary protection team at JPL are still available to support MSL lessons learned and knowledge capture; some of the specifically recommended activities have already begun. The Mars Program shares the PPS/NAC concerns about loss of potential information & expertise in planetary protection practice.

  7. Lessons Learned from Ares I Upper Stage Structures and Thermal Design

    NASA Technical Reports Server (NTRS)

    Ahmed, Rafiq

    2012-01-01

    The Ares 1 Upper Stage was part of the vehicle intended to succeed the Space Shuttle as the United States manned spaceflight vehicle. Although the Upper Stage project was cancelled, there were many lessons learned that are applicable to future vehicle design. Lessons learned that are briefly detailed in this Technical Memorandum are for specific technical areas such as tank design, common bulkhead design, thrust oscillation, control of flight and slosh loads, purge and hazardous gas system. In addition, lessons learned from a systems engineering and vehicle integration perspective are also included, such as computer aided design and engineering, scheduling, and data management. The need for detailed systems engineering in the early stages of a project is emphasized throughout this report. The intent is that future projects will be able to apply these lessons learned to keep costs down, schedules brief, and deliver products that perform to the expectations of their customers.

  8. Lesson Study as Professional Development within Secondary Physics Teacher Professional Learning Communities

    NASA Astrophysics Data System (ADS)

    Collins, Tonya Monique Nicki

    Two Professional Learning Communities of physics teachers from different high schools voluntarily participated in Lesson Study as a means of professional development. The five teacher-participants and one participant-researcher partook of two Lesson Study cycles, each of which focused on student physics misconceptions. The Lesson Study resulted in two topics of physics: projectiles and gravitation. The researcher aimed to determine what happens to secondary physics teachers who undergo Lesson Study through this phenomenological case study. Specifically, (1) What is the process of Lesson Study with secondary physics teachers? and (2) What are the teacher-reported outcomes of Lesson Study with secondary physics teachers? Overall, Lesson Study provided an avenue for secondary physics teachers to conduct inquiry on their students in an attempt to better understand student thinking and learning. As a result, teachers collaborated to learn how to better meet the needs of their students and self-reported growth in many areas of teaching and teacher knowledge. The study resulted in twelve hypotheses to be tested in later research centering on idealizing the process of Lesson Study and maximizing secondary physics teacher growth.

  9. Lessons learned from the Space Flyer Unit (SFU) mission.

    PubMed

    Kuriki, Kyoichi; Ninomiya, Keiken; Takei, Mitsuru; Matsuoka, Shinobu

    2002-11-01

    The Space Flyer Unit (SFU) system and mission chronology are briefly introduced. Lessons learned from the SFU mission are categorized as programmatic and engineering lessons. In the programmatic category are dealt with both international and domestic collaborations. As for the engineering lessons safety design, orbital operation, in-flight anomaly, and post flight analyses are the major topics reviewed. c2002 Elsevier Science Ltd. All rights reserved.

  10. Integrating Instruments of Power and Influence: Lessons Learned and Best Practices

    DTIC Science & Technology

    2008-01-01

    practices developed by ACT’s Joint Analysis and Lessons Learned Centre in Monsanto , Portugal. Summary xix European Union An increasing European role in...oversees the Joint Analysis and Lessons Learned Centre in Monsanto , Por- tugal, the mission of which is critical for the purposes of this report. These

  11. MSFC Skylab lessons learned

    NASA Technical Reports Server (NTRS)

    1974-01-01

    Key lessons learned during the Skylab Program that could have impact on on-going and future programs are presented. They present early and sometimes subjective opinions; however, they give insights into key areas of concern. These experiences from a complex space program management and space flight serve as an early assessment to provide the most advantage to programs underway. References to other more detailed reports are provided.

  12. NeXT Application Development Workshop. [Use and Design of Instructional Applications on the NeXT Computer.

    ERIC Educational Resources Information Center

    Kiel, Don; And Others

    Instructional applications for NeXT computers were developed by nine faculty members from the biology, mathematics and computer science, fine arts, chemistry, physics and astronomy, and geology departments as part of a grant awarded to the California State University at Los Angeles. These notes provide a schedule of events and reports from a 2-day…

  13. Lessons learned and their application to program development and cultural issues

    NASA Technical Reports Server (NTRS)

    Roth, Gilbert L.

    1991-01-01

    The main objectives of space product assurance are, in effect, the same as those of Total Quality Management (TQM) or its many variants. The most significant ingredients are the lessons learned and their application to ongoing and future programs as they are affected by changes in the cultural environment. The cultural issues which affect almost everything done in technical programs and projects are considered. Understanding the lessons learned and the synergism which results from this combination of knowledge, culture, and lessons learned is identified as crucial. A brief discussion of the closed loop linkage that should exist between the world of hands on activities and that of educational institutions is presented.

  14. Key Events in Student Leaders' Lives and Lessons Learned from Them

    ERIC Educational Resources Information Center

    Sessa, Valerie I.; Morgan, Brett V.; Kalenderli, Selin; Hammond, Fanny E.

    2014-01-01

    This descriptive study used an interview protocol developed by the Center for Creative Leadership with 50 college student leaders to determine what key developmental events young college leaders experience and the leadership lessons learned from these events. Students discussed 180 events and 734 lessons learned from them. Most events defined by…

  15. The Value of Identifying and Recovering Lost GN&C Lessons Learned: Aeronautical, Spacecraft, and Launch Vehicle Examples

    NASA Technical Reports Server (NTRS)

    Dennehy, Cornelius J.; Labbe, Steve; Lebsock, Kenneth L.

    2010-01-01

    Within the broad aerospace community the importance of identifying, documenting and widely sharing lessons learned during system development, flight test, operational or research programs/projects is broadly acknowledged. Documenting and sharing lessons learned helps managers and engineers to minimize project risk and improve performance of their systems. Often significant lessons learned on a project fail to get captured even though they are well known 'tribal knowledge' amongst the project team members. The physical act of actually writing down and documenting these lessons learned for the next generation of NASA GN&C engineers fails to happen on some projects for various reasons. In this paper we will first review the importance of capturing lessons learned and then will discuss reasons why some lessons are not documented. A simple proven approach called 'Pause and Learn' will be highlighted as a proven low-impact method of organizational learning that could foster the timely capture of critical lessons learned. Lastly some examples of 'lost' GN&C lessons learned from the aeronautics, spacecraft and launch vehicle domains are briefly highlighted. In the context of this paper 'lost' refers to lessons that have not achieved broad visibility within the NASA-wide GN&C CoP because they are either undocumented, masked or poorly documented in the NASA Lessons Learned Information System (LLIS).

  16. Co-Creation Learning Procedures: Comparing Interactive Language Lessons for Deaf and Hearing Students.

    PubMed

    Hosono, Naotsune; Inoue, Hiromitsu; Tomita, Yutaka

    2017-01-01

    This paper discusses co-creation learning procedures of second language lessons for deaf students, and sign language lessons by a deaf lecturer. The analyses focus on the learning procedure and resulting assessment, considering the disability. Through questionnaires ICT-based co-creative learning technologies are effective and efficient and promote spontaneous learning motivation goals.

  17. WHC significant lessons learned 1993--1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bickford, J.C.

    1997-12-12

    A lesson learned as defined in DOE-STD-7501-95, Development of DOE Lessons Learned Programs, is: A ``good work practice`` or innovative approach that is captured and shared to promote repeat applications or an adverse work practice or experience that is captured and shared to avoid a recurrence. The key word in both parts of this definition is ``shared``. This document was published to share a wide variety of recent Hanford experiences with other DOE sites. It also provides a valuable tool to be used in new employee and continuing training programs at Hanford facilities and at other DOE locations. This manualmore » is divided into sections to facilitate extracting appropriate subject material when developing training modules. Many of the bulletins could be categorized into more than one section, however, so examination of other related sections is encouraged.« less

  18. Social support and child protection: Lessons learned and learning.

    PubMed

    Thompson, Ross A

    2015-03-01

    Social support has been a topic of research for nearly 50 years, and its applications to prevention and intervention have grown significantly, including programs advancing child protection. This article summarizes the central conclusions of the 1994 review of research on social support and the prevention of child maltreatment prepared for the U.S. Advisory Board on Child Abuse and Neglect, and surveys advances in the field since its publication. Among the lessons learned twenty years ago are (a) the diversity of the social support needs of at-risk families and their association with child endangerment, (b) the need to supplement the emotionally affirmative aspects of social support with efforts to socialize parenting practices and monitor child well-being, (c) the desirability of integrating formal and informal sources of social support for recipients, and (d) the importance of considering the complex recipient reactions to receiving support from others. The lessons we are now learning derive from research exploring the potential of online communication to enhance social support, the neurobiology of stress and its buffering through social support, and the lessons of evaluation research that are identifying the effective ingredients of social support interventions. Copyright © 2014 Elsevier Ltd. All rights reserved.

  19. Heritage Adoption Lessons Learned: Cover Deployment and Latch Mechanism

    NASA Technical Reports Server (NTRS)

    Wincentsen, James

    2006-01-01

    Within JPL, there is a technology thrust need to develop a larger Cover Deployment and Latch Mechanism (CDLM) for future missions. The approach taken was to adopt and scale the CDLM design as used on the Galaxy Evolution Explorer (GALEX) project. The three separate mechanisms that comprise the CDLM will be discussed in this paper in addition to a focus on heritage adoption lessons learned and specific examples. These lessons learned will be valuable to any project considering the use of heritage designs.

  20. The lift-fan powered-lift aircraft concept: Lessons learned

    NASA Technical Reports Server (NTRS)

    Deckert, Wallace H.

    1993-01-01

    This is one of a series of reports on the lessons learned from past research related to lift-fan aircraft concepts. An extensive review is presented of the many lift-fan aircraft design studies conducted by both government and industry over the past 45 years. Mission applications and design integration including discussions on manifolding hot gas generators, hot gas dusting, and energy transfer control are addressed. Past lift-fan evaluations of the Avrocar are discussed. Lessons learned from these past efforts are identified.

  1. Experiential Learning: Lessons Learned from the UND Business and Government Symposium

    ERIC Educational Resources Information Center

    Harsell, Dana Michael; O'Neill, Patrick B.

    2010-01-01

    The authors describe lessons learned from a limited-duration experiential learning component of a Master's level course. The course is open to Master's in Business and Master's in Public Administration students and explores the relationships between government and business. A complete discussion of the Master's in Business and Master's in Public…

  2. Lessons learned on the Skylab program

    NASA Technical Reports Server (NTRS)

    1974-01-01

    Lessons learned in the Skylab program and their application and adaptation to other space programs are summarized. Recommendations and action taken on particular problems are described. The use of Skylab recommendations to identify potential problems of future space programs is discussed.

  3. Seizing the Moment: State Lessons for Transforming Professional Learning

    ERIC Educational Resources Information Center

    Learning Forward, 2013

    2013-01-01

    Explore this first look at lessons learned through Learning Forward's ongoing initiative to develop a comprehensive system of professional learning that spans the distance from the statehouse to the classroom. This policy brief underscores the importance of a coordinated state professional learning strategy, the adoption of professional learning…

  4. Lessons Learned from the Node 1 Temperature and Humidity Control Subsystem Design

    NASA Technical Reports Server (NTRS)

    Williams, David E.

    2010-01-01

    Node 1 flew to the International Space Station (ISS) on Flight 2A during December 1998. To date the National Aeronautics and Space Administration (NASA) has learned a lot of lessons from this module based on its history of approximately two years of acceptance testing on the ground and currently its twelve years on-orbit. This paper will provide an overview of the ISS Environmental Control and Life Support (ECLS) design of the Node 1 Temperature and Humidity Control (THC) subsystem and it will document some of the lessons that have been learned to date for this subsystem and it will document some of the lessons that have been learned to date for these subsystems based on problems prelaunch, problems encountered on-orbit, and operational problems/concerns. It is hoped that documenting these lessons learned from ISS will help in preventing them in future Programs. 1

  5. Lessons learned applying CASE methods/tools to Ada software development projects

    NASA Technical Reports Server (NTRS)

    Blumberg, Maurice H.; Randall, Richard L.

    1993-01-01

    This paper describes the lessons learned from introducing CASE methods/tools into organizations and applying them to actual Ada software development projects. This paper will be useful to any organization planning to introduce a software engineering environment (SEE) or evolving an existing one. It contains management level lessons learned, as well as lessons learned in using specific SEE tools/methods. The experiences presented are from Alpha Test projects established under the STARS (Software Technology for Adaptable and Reliable Systems) project. They reflect the front end efforts by those projects to understand the tools/methods, initial experiences in their introduction and use, and later experiences in the use of specific tools/methods and the introduction of new ones.

  6. Applying ergonomics to systems: some documented "lessons learned".

    PubMed

    Hendrick, Hal W

    2008-07-01

    Based on evidence accumulated during the author's 45 years of professional experience, the author presents 23 important "lessons learned" regarding applying ergonomics to systems. Documented results from reported cases or other evidence are presented to validate each of these practical learning points.

  7. Lessons learned in crisis management.

    PubMed

    Olson, Chris

    2014-01-01

    This paper will explore lessons learned following a series of natural and man-made disasters affecting the Massachusetts Mutual Life Insurance Company and/or its subsidiaries. The company employs a team of certified continuity professionals who are charged with overseeing resilience on behalf of the enterprise and leading recovery activities wherever and whenever necessary.

  8. Commissioning MMS: Challenges and Lessons Learned

    NASA Technical Reports Server (NTRS)

    Wood, Paul; Gramling, Cheryl; Reiter, Jennifer; Smith, Patrick; Stone, John

    2016-01-01

    This paper discusses commissioning of NASA's Magnetospheric MultiScale (MMS) Mission. The mission includes four identical spacecraft with a large, complex set of instrumentation. The planning for and execution of commissioning for this mission is described. The paper concludes by discussing lessons learned.

  9. Ada/Xt Architecture: Design Report for the Software Technology for Adaptable, Reliable Systems (STARS)

    DTIC Science & Technology

    1990-01-25

    N Task: UR20 CDRL: 01000 N UR2O--ProcesslEnvironmentx Ada/Xt. Architecture : Design Report ~ ~ fFCp Informal Technical Data I? ,LECp Sofwar Tehoog for...S. FUNDING NUMBERS Ada/Xt Architecture : Design Report STARS Contract 6.AUTHOR(S)_ Ft9628-88-D-0031 6. AUTHOR(S) Kurt Wallnau 7. PERFORMING...of the STARS Prime contract under the Process Environment Integration task (UR20). This document "Ada Xt Architecture : Design Report", type A005

  10. Constellation Lessons Learned Executive Summary

    NASA Technical Reports Server (NTRS)

    Thomas, L. Dale; Neubek, Deb

    2011-01-01

    This slide presentation reviews the lessons learned from the Constellation Program (CxP) and identified several factors that contributed to the inability of the CxP to meet the cost and schedule commitments. The review includes a significant section on the context in which the CxP operated since new programs are likely to experience the same constraints.

  11. Atmospheric/Space Environment Support Lessons Learned Regarding Aerospace Vehicle Design and Operations

    NASA Technical Reports Server (NTRS)

    Vaughan, William W.; Anderson, B. Jeffrey

    2005-01-01

    In modern government and aerospace industry institutions the necessity of controlling current year costs often leads to high mobility in the technical workforce, "one-deep" technical capabilities, and minimal mentoring for young engineers. Thus, formal recording, use, and teaching of lessons learned are especially important in the maintenance and improvement of current knowledge and development of new technologies, regardless of the discipline area. Within the NASA Technical Standards Program Website http://standards.nasa.gov there is a menu item entitled "Lessons Learned/Best Practices". It contains links to a large number of engineering and technical disciplines related data sets that contain a wealth of lessons learned information based on past experiences. This paper has provided a small sample of lessons learned relative to the atmospheric and space environment. There are many more whose subsequent applications have improved our knowledge of the atmosphere and space environment, and the application of this knowledge to the engineering and operations for a variety of aerospace programs.

  12. Improving the primary school science learning unit about force and motion through lesson study

    NASA Astrophysics Data System (ADS)

    Phaikhumnam, Wuttichai; Yuenyong, Chokchai

    2018-01-01

    The study aimed to develop primary school science lesson plan based on inquiry cycle (5Es) through lesson study. The study focused on the development of 4 primary school science lesson plans of force and motion for Grade 3 students in KKU Demonstration Primary School (Suksasart), first semester of 2015 academic year. The methodology is mixed method. The Inthaprasitha (2010) lesson study cycle was implemented in group of KKU Demonstration Primary School. Instruments of reflection of lesson plan developing included participant observation, meeting and reflection report, lesson plan and other document. The instruments of examining students' learning include classroom observation and achievement test. Data was categorized from these instruments to find the issues of changing and improving the good lesson plan of Thai primary school science learning. The findings revealed that teachers could develop the lesson plans through lesson study. The issues of changing and improving were disused by considering on engaging students related to societal issues, students' prior knowledge, scientific concepts for primary school students, and what they learned from their changing. It indicated that the Lesson Study allowed primary school science teachers to share ideas and develop ideas to improve the lesson. The study may have implications for Thai science teacher education through Lesson Study.

  13. Global polio eradication initiative: lessons learned and legacy.

    PubMed

    Cochi, Stephen L; Freeman, Andrew; Guirguis, Sherine; Jafari, Hamid; Aylward, Bruce

    2014-11-01

    The world is on the verge of achieving global polio eradication. During >25 years of operations, the Global Polio Eradication Initiative (GPEI) has mobilized and trained millions of volunteers, social mobilizers, and health workers; accessed households untouched by other health initiatives; mapped and brought health interventions to chronically neglected and underserved communities; and established a standardized, real-time global surveillance and response capacity. It is important to document the lessons learned from polio eradication, especially because it is one of the largest ever global health initiatives. The health community has an obligation to ensure that these lessons and the knowledge generated are shared and contribute to real, sustained changes in our approach to global health. We have summarized what we believe are 10 leading lessons learned from the polio eradication initiative. We have the opportunity and obligation to build a better future by applying the lessons learned from GPEI and its infrastructure and unique functions to other global health priorities and initiatives. In so doing, we can extend the global public good gained by ending for all time one of the world's most devastating diseases by also ensuring that these investments provide public health dividends and benefits for years to come. Published by Oxford University Press on behalf of the Infectious Diseases Society of America 2014. This work is written by (a) US Government employee(s) and is in the public domain in the US.

  14. Lessons Learned from the NASA Plum Brook Reactor Facility Decommissioning

    NASA Technical Reports Server (NTRS)

    2010-01-01

    NASA has been conducting decommissioning activities at its PBRF for the last decade. As a result of all this work there have been several lessons learned both good and bad. This paper presents some of the more exportable lessons.

  15. Lessons Learned for Collaborative Clinical Content Development

    PubMed Central

    Collins, S.A.; Bavuso, K.; Zuccotti, G.; Rocha, R.A.

    2013-01-01

    Background Site-specific content configuration of vendor-based Electronic Health Records (EHRs) is a vital step in the development of standardized and interoperable content that can be used for clinical decision-support, reporting, care coordination, and information exchange. The multi-site, multi-stakeholder Acute Care Documentation (ACD) project at Partners Healthcare Systems (PHS) aimed to develop highly structured clinical content with adequate breadth and depth to meet the needs of all types of acute care clinicians at two academic medical centers. The Knowledge Management (KM) team at PHS led the informatics and knowledge management effort for the project. Objectives We aimed to evaluate the role, governance, and project management processes and resources for the KM team’s effort as part of the standardized clinical content creation. Methods We employed the Center for Disease Control’s six step Program Evaluation Framework to guide our evaluation steps. We administered a forty-four question, open-ended, semi-structured voluntary survey to gather focused, credible evidence from members of the KM team. Qualitative open-coding was performed to identify themes for lessons learned and concluding recommendations. Results Six surveys were completed. Qualitative data analysis informed five lessons learned and thirty specific recommendations associated with the lessons learned. The five lessons learned are: 1) Assess and meet knowledge needs and set expectations at the start of the project; 2) Define an accountable decision-making process; 3) Increase team meeting moderation skills; 4) Ensure adequate resources and competency training with online asynchronous collaboration tools; 5) Develop focused, goal-oriented teams and supportive, consultative service based teams. Conclusions Knowledge management requirements for the development of standardized clinical content within a vendor-based EHR among multi-stakeholder teams and sites include: 1) assessing and meeting

  16. Turning Operational Lessons Learned into Design Reality

    NASA Technical Reports Server (NTRS)

    Brady, David A.

    2009-01-01

    The capabilities and limitations of a particular system design are well known by the people who operate it. Operational workarounds, operational notes and lessons learned are traditional methods for dealing with and documenting design shortcomings. The beginning of each new program brings the hope that hard-learned lessons will be incorporated into the next new system. But often operations personnel find their well-intentioned efforts frustrated by an inability to have their inputs considered by design personnel who have strictly-scoped requirements that are coupled with ambitious cost and schedule targets. There is a way for operational inputs to make it into the design, but the solution involves a combination of organizational culture and technical data. Any organization that utilizes this approach can realize significant benefits over the life cycle of their project.

  17. Mobile Learning vs. Traditional Classroom Lessons: A Comparative Study

    ERIC Educational Resources Information Center

    Furió, D.; Juan, M.-C.; Seguí, I.; Vivó, R.

    2015-01-01

    Different methods can be used for learning, and they can be compared in several aspects, especially those related to learning outcomes. In this paper, we present a study in order to compare the learning effectiveness and satisfaction of children using an iPhone game for learning the water cycle vs. the traditional classroom lesson. The iPhone game…

  18. NASA Access Mechanism: Lessons learned document

    NASA Technical Reports Server (NTRS)

    Burdick, Lisa; Dunbar, Rick; Duncan, Denise; Generous, Curtis; Hunter, Judy; Lycas, John; Taber-Dudas, Ardeth

    1994-01-01

    The six-month beta test of the NASA Access Mechanism (NAM) prototype was completed on June 30, 1993. This report documents the lessons learned from the use of this Graphical User Interface to NASA databases such as the NASA STI Database, outside databases, Internet resources, and peers in the NASA R&D community. Design decisions, such as the use of XWindows software, a client-server distributed architecture, and use of the NASA Science Internet, are explained. Users' reactions to the interface and suggestions for design changes are reported, as are the changes made by the software developers based on new technology for information discovery and retrieval. The lessons learned section also reports reactions from the public, both at demonstrations and in response to articles in the trade press and journals. Recommendations are included for future versions, such as a World Wide Web (WWW) and Mosaic based interface to heterogeneous databases, and NAM-Lite, a version which allows customization to include utilities provided locally at NASA Centers.

  19. CAT/RF Simulation Lessons Learned

    DTIC Science & Technology

    2003-06-11

    IVSS-2003-MAS-7 CAT /RF Simulation Lessons Learned Christopher Mocnik Vetronics Technology Area, RDECOM TARDEC Tim Lee DCS Corporation...developed a re- configurable Unmanned Ground Vehicle (UGV) simulation for the Crew integration and Automation Test bed ( CAT ) and Robotics Follower (RF...Advanced Technology Demonstration (ATD) experiments. This simulation was developed as a component of the Embedded Simulation System (ESS) of the CAT

  20. Apollo 1 Lessons Learned Show

    NASA Image and Video Library

    2017-01-27

    John Tribe, retired, Apollo 1 Reaction and Control System lead engineer, answers questions during the Apollo 1 Lessons Learned event in the Training Auditorium at NASA’s Kennedy Space Center in Florida. The theme of the presentation was "To There and Back Again." The event helped pay tribute to the Apollo 1 crew, Gus Grissom, Ed White II, and Roger Chaffee.

  1. Apollo 1 Lessons Learned Show

    NASA Image and Video Library

    2017-01-27

    Ernie Reyes, retired, former Apollo 1 senior operations manager, signs a book for a worker after the Apollo 1 Lessons Learned presentation in the Training Auditorium at NASA's Kennedy Space Center in Florida. The theme of the program was "To there and Back Again." The event helped pay tribute to the Apollo 1 crew, Gus Grissom, Ed White II, and Roger Chaffee.

  2. Reconstructing High School Chemical Reaction Lessons to Motivate and Support Conceptual Learning

    NASA Astrophysics Data System (ADS)

    Ndiforamang, Nathan Moma

    The primary focus of this education leadership portfolio is to reconstruct lessons on chemical reaction concepts for teachers to use and reach all learners of chemistry in Cecil County Public Schools. As a high school chemistry teacher, I have observed that student enrollment in chemistry is relatively low, and students show little enthusiasm about being successful in chemistry compared to other science subjects. To understand these issues, I researched conceptual learning, misconceptions, and best practices; prepared open-ended questions in a survey for chemistry teachers in my district; distributed the survey; received their responses; and processed the information received. I analyzed the data using qualitative techniques, and the results revealed that many of the tools provided in the district's curriculum guide for chemistry were not effective in class. I used the data to search for learning tools and classroom resources that could improve students understanding of chemistry concepts. I then reconstructed eight lessons on chemical reaction concepts utilizing those tools and resources. I redistributed the reconstructed lessons to teachers who had volunteered to review the lessons and provide professional feedback. The teachers' feedback revealed that the tools and resources incorporated in the reconstructed lessons included interactive activities that would excite students. The teachers indicated that the lessons were technology rich and included a variety of learning strategies. They also noted that the lessons included too many activities to cover within a day's lesson, and some of the recommended weblinks had technical issues. Most of the suggestions received were used to improve the quality of the reconstructed lessons and will serve as a resource for future fine-tuning of the lessons.

  3. Teachers' Self-Regulated Learning Lesson Design: Integrating Learning from Problems and Successes

    ERIC Educational Resources Information Center

    Michalsky, Tova; Schechter, Chen

    2018-01-01

    Teachers' design of a lesson is critical for helping their students develop academically effective forms of self-regulating learning (SRL) in classrooms. Using a quasi-experimental design, the researchers integrated systematic collaborative learning from problematic and successful experiences into teachers' preparatory programs and examined how…

  4. Kinesthetic Astronomy: Significant Upgrades to the Sky Time Lesson that Support Student Learning

    NASA Astrophysics Data System (ADS)

    Morrow, C. A.; Zawaski, M.

    2004-12-01

    This paper will report on a significant upgrade to the first in a series of innovative, experiential lessons we call Kinesthetic Astronomy. The Sky Time lesson reconnects students with the astronomical meaning of the day, year, and seasons. Like all Kinesthetic Astronomy lessons, it teaches basic astronomical concepts through choreographed bodily movements and positions that provide educational sensory experiences. They are intended for sixth graders up through adult learners in both formal and informal educational settings. They emphasize astronomical concepts and phenomenon that people can readily encounter in their "everyday" lives such as time, seasons, and sky motions of the Sun, Moon, stars, and planets. Kinesthetic Astronomy lesson plans are fully aligned with national science education standards, both in content and instructional practice. Our lessons offer a complete learning cycle with written assessment opportunities now embedded throughout the lesson. We have substantially strengthened the written assessment options for the Sky Time lesson to help students translate their kinesthetic and visual learning into the verbal-linguistic and mathematical-logical realms of expression. Field testing with non-science undergraduates, middle school science teachers and students, Junior Girl Scouts, museum education staff, and outdoor educators has been providing evidence that Kinesthetic Astronomy techniques allow learners to achieve a good grasp of concepts that are much more difficult to learn in more conventional ways such as via textbooks or even computer animation. Field testing of the Sky Time lesson has also led us to significant changes from the previous version to support student learning. We will report on the nature of these changes.

  5. New Horizons Risk Communication Strategy, Planning, Implementation, and Lessons Learned

    NASA Technical Reports Server (NTRS)

    Dawson, Sandra A.

    2006-01-01

    This paper discusses the risk communication goals, strategy, planning process and product development for the New Horizons mission, including lessons from the Cassini mission that were applied in that effort, and presents lessons learned from the New Horizons effort that could be applicable to future missions.

  6. 77 FR 64565 - Solicitation of Feedback and Lessons-Learned from the Pilot of the Revised Construction Reactor...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-22

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0249] Solicitation of Feedback and Lessons-Learned from... or the Commission) is soliciting feedback and lessons-learned from members of the public, licensees... constructed in accordance with the licensing basis. The NRC has applied lessons- learned from the prior plants...

  7. Developing and Sustaining Partnerships: Lessons Learned.

    ERIC Educational Resources Information Center

    Wills, Joan L.; Kaufmann, Barbara A.

    This paper reports on a study that examined skill standards pilot programs to identify lessons learned in the selection and involvement of representatives from the various stakeholder communities and the potential for sustaining the efforts of the pilot programs. Data were gathered through structured conversations with staff and committee members…

  8. Lessons Learned from MSG-048

    DTIC Science & Technology

    2010-02-01

    reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of... data producer/consumer issue! Need to control the simulation reporting rates. 11 Lessons Learned from MSG-048 Requirements for BML-enabled...Simulation Model Requirements vary depending on: – Model domain – Echelon – Complexity – Level of automation – Level of detail – Nation-specific data

  9. CLIPS on the NeXT computer

    NASA Technical Reports Server (NTRS)

    Charnock, Elizabeth; Eng, Norman

    1990-01-01

    This paper discusses the integration of CLIPS into a hybrid expert system neural network AI tool for the NeXT computer. The main discussion is devoted to the joining of these two AI paradigms in a mutually beneficial relationship. We conclude that expert systems and neural networks should not be considered as competing AI implementation methods, but rather as complimentary components of a whole.

  10. Multi-Modal Traveler Information System - Lessons Learned

    DOT National Transportation Integrated Search

    1997-05-19

    The purpose of this working paper is to provide an information base of lessons learned from activities similar to the design of the Gary Chicago Milwaukee (GCM) Corridor Architecture and the Gateway Traveler Information System (TIS). Many similar act...

  11. WHY CAN'T WE LEARN FROM OUR MISTAKES LEARN THE LESSON TELL THE STORY

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LANGSTAFF, D.C.

    2005-02-03

    Tell the story well and people can learn from the lesson. The United States Department of Energy (DOE) Office of Environmental Management (EM) and its contractors are pursuing environmental remediation at the Hanford Site. This endeavor has been underway for a number of years, both at Hanford and at other sites across the DOE complex. Independently, the occurrence of two fatalities on two Sites at opposite ends of the country within two weeks raised the question, ''What is going on in the Field?'' Corporate EM management communicated directly with Field Office Managers to answer the question. As a result ofmore » this intense interest and focused communication, EM identified four areas that need additional exploration. One of those is, ''EM's ability to learn from its mistakes.'' The need to cultivate the ability to learn from our mistakes is not unique to DOE. A quick review of EM Lessons Learned reports shows that most of the reports in the EM system originate at the sites with the largest budgets doing the most work. A second look, however, reveals that many reports are repetitive, that many people might consider many reports trivial, and that reports on some of the more significant events sometimes take a long time to get distributed across the DOE Complex. Spot checks of event reports revealed frequent identification of symptoms rather than root causes. With a high percentage of identified root causes in the questionable category, it is highly unlikely that the real root causes of many events are being corrected, thus leading to recurrences of events. To learn the lesson from an event, people need to be aware of the root causes of the event. Someone has to tell a story the reader can learn from, i.e., include all the information needed to understand what happened and why it happened. Most importantly, they need to understand the lesson to be learned.« less

  12. Lessons Learned from Developing a Patient Engagement Panel: An OCHIN Report.

    PubMed

    Arkind, Jill; Likumahuwa-Ackman, Sonja; Warren, Nate; Dickerson, Kay; Robbins, Lynn; Norman, Kathy; DeVoe, Jennifer E

    2015-01-01

    There is renewed interest in patient engagement in clinical and research settings, creating a need for documenting and publishing lessons learned from efforts to meaningfully engage patients. This article describes early lessons learned from the development of OCHIN's Patient Engagement Panel (PEP). OCHIN supports a national network of more than 300 community health centers (CHCs) and other primary care settings that serve over 1.5 million patients annually across nearly 20 states. The PEP was conceived in 2009 to harness the CHC tradition of patient engagement in this new era of patient-centered outcomes research and to ensure that patients were engaged throughout the life cycle of our research projects, from conception to dissemination. Developed by clinicians and researchers within our practice-based research network, recruitment of patients to serve as PEP members began in early 2012. The PEP currently has a membership of 18 patients from 3 states. Over the past 24 months, the PEP has been involved with 12 projects. We describe developing the PEP and challenges and lessons learned (eg, recruitment, funding model, creating value for patient partners, compensation). These lessons learned are relevant not only for research but also for patient engagement in quality improvement efforts and other clinical initiatives. © Copyright 2015 by the American Board of Family Medicine.

  13. Nursing 1000: a mosaic of lessons learned from patients.

    PubMed

    Quinlan-Colwell, Ann

    2010-09-01

    Throughout my nursing career, I have been most grateful for the education and lessons that I received from the many gifted women and men faculty in the nursing programs I attended. From learning how to give a bed bath and intramuscular injections to writing a doctoral research proposal, the information, wisdom, guidance, and resources they shared with me are invaluable. I also am fortunate to have had the privilege of caring for many patients from whom I also learned invaluable lessons. Together, this latter group of women and men formed the faculty of Nursing 1000. They are the patients who were instrumental in shaping me and my nursing career. Many of them are no longer alive, and all of our paths have diverged, yet they remain influential in how I work with patients on a daily basis. The lessons they taught me form a most special montage. This mosaic article is a way to share with others what the faculty of Nursing 1000 taught me. It is also, in a small way, a tribute to all of the unique men and women with whom, as a nurse, I have shared transpersonal caring experiences and from whom I have learned much. The faculty of Nursing 1000 is composed of a variety of patients for whom I cared and who taught me valuable lessons that guided me in how to better care for patients in the future. Although the Nursing 1000 faculty are no longer physically part of my life, each day they continue to influence how I interact with others. The lessons they taught form a very special mosaic. To protect their confidentiality, all patient names are pseudonyms.

  14. Integration of CW / Radionucleotide Detection Systems to the Fido XT Explosives Detector

    DTIC Science & Technology

    2008-07-31

    explosives detected by the Fido XT. Additionally, a platform for centralized storage and processing of Fido XT data files collected in house, targeted...fused silica glass wool (obtained from Restek). The fluorescent signal was easily washed out of the flow cell by a nominal amount of buffer...detector with supporting NRE was processed . The Interceptor components were configured to operate under a Windows CE processor environment, and to

  15. The roles of lesson study in the development of mathematics learning instrument based on learning trajectory

    NASA Astrophysics Data System (ADS)

    Misnasanti; Dien, C. A.; Azizah, F.

    2018-03-01

    This study is aimed to describe Lesson Study (LS) activity and its roles in the development of mathematics learning instruments based on Learning Trajectory (LT). This study is a narrative study of teacher’s experiences in joining LS activity. Data collecting in this study will use three methods such as observation, documentations, and deep interview. The collected data will be analyzed with Milles and Huberman’s model that consists of reduction, display, and verification. The study result shows that through LS activity, teachers know more about how students think. Teachers also can revise their mathematics learning instrument in the form of lesson plan. It means that LS activity is important to make a better learning instruments and focus on how student learn not on how teacher teach.

  16. Defining a risk-informed framework for whole-of-government lessons learned: A Canadian perspective.

    PubMed

    Friesen, Shaye K; Kelsey, Shelley; Legere, J A Jim

    Lessons learned play an important role in emergency management (EM) and organizational agility. Virtually all aspects of EM can derive benefit from a lessons learned program. From major security events to exercises, exploiting and applying lessons learned and "best practices" is critical to organizational resilience and adaptiveness. A robust lessons learned process and methodology provides an evidence base with which to inform decisions, guide plans, strengthen mitigation strategies, and assist in developing tools for operations. The Canadian Safety and Security Program recently supported a project to define a comprehensive framework that would allow public safety and security partners to regularly share event response best practices, and prioritize recommendations originating from after action reviews. This framework consists of several inter-locking elements: a comprehensive literature review/environmental scan of international programs; a survey to collect data from end users and management; the development of a taxonomy for organizing and structuring information; a risk-informed methodology for selecting, prioritizing, and following through on recommendations; and standardized templates and tools for tracking recommendations and ensuring implementation. This article discusses the efforts of the project team, which provided "best practice" advice and analytical support to ensure that a systematic approach to lessons learned was taken by the federal community to improve prevention, preparedness, and response activities. It posits an approach by which one might design a systematic process for information sharing and event response coordination-an approach that will assist federal departments to institutionalize a cross-government lessons learned program.

  17. Life After Being a Pathology Department Chair II: Lessons Learned.

    PubMed

    Bailey, David N; Lipscomb, Mary F; Gorstein, Fred; Wilkinson, David; Sanfilippo, Fred

    2017-01-01

    The 2016 Association of Pathology Chairs annual meeting featured a discussion group of Association of Pathology Chairs senior fellows (former chairs of academic departments of pathology who have remained active in Association of Pathology Chairs) that focused on how they decided to transition from the chair, how they prepared for such transition, and what they did after the transition. At the 2017 annual meeting, the senior fellows (encompassing 481 years of chair service) discussed lessons they learned from service as chair. These lessons included preparation for the chairship, what they would have done differently as chair, critical factors for success as chair, factors associated with failures, stress reduction techniques for themselves and for their faculty and staff, mechanisms for dealing with and avoiding problems, and the satisfaction they derived from their service as chair. It is reasonable to assume that these lessons may be representative of those learned by chairs of other specialties as well as by higher-level academic administrators such as deans, vice presidents, and chief executive officers. Although the environment for serving as a department chair has been changing dramatically, many of the lessons learned by former chairs are still valuable for current chairs of any length of tenure.

  18. Propulsion Ground Testing with High Test Peroxide: Lessons Learned

    NASA Technical Reports Server (NTRS)

    Bruce, Robert; Taylor, Gary; Taliancich, Paula

    2002-01-01

    Propulsion Ground Testing with High Test Peroxide (85 to 98% concentration) began at the NASA John C. Stennis Space Center in calendar year 1998, when the E3 Test Facility was modified to accomodate hydrogen peroxide (H2O2) in order to suport the research and development testing of the USAF Upper Stage Flight Experiment rocket engine. Since that time, efforts have continued to provide actual and planned test services to various customers, both U.S. Government and Commercial, in the ground test of many test articles, ranging from gas generators, to catalyst beds, to turbomachinery, to main injectors, to combustion chambers, to integrated rocket engines, to integrated stages. Along this path, and over the past 4 years, there has been both the rediscovery of previously learned lessons, through literature search, archive review, and personal interviews, as well as the learning of many new lessons as new areas are explored and new endeavors are tried. This paper will summarize those lessons learned in an effort to broaden the knowledge base as High Test Peroxide is considered more widely for use in rocket propulsion applications.

  19. Professional Learning through the Collaborative Design of Problem-Solving Lessons

    ERIC Educational Resources Information Center

    Wake, Geoff; Swan, Malcolm; Foster, Colin

    2016-01-01

    This article analyses lesson study as a mode of professional learning, focused on the development of mathematical problem solving processes, using the lens of cultural-historical activity theory. In particular, we draw attention to two activity systems, the classroom system and the lesson-study system, and the importance of making artefacts…

  20. Lessons Learned from School Crises and Emergencies, Vol. 1, Issue 2, Fall 2006

    ERIC Educational Resources Information Center

    US Department of Education, 2006

    2006-01-01

    "Lessons Learned" is a series of publications that are a brief recounting of actual school emergencies and crises. School and student names have been changed to protect identities. Information for this publication was gathered through a series of interviews with school stakeholders involved in the actual incident. This "Lessons Learned" issue…

  1. NASA Lessons Learned from Space Lubricated Mechanisms

    NASA Technical Reports Server (NTRS)

    Predmore, Roamer E.

    2000-01-01

    This document reviews the lessons learned from short-life and long life lubricated space mechanisms. A short-life lubricated mechanisms complete their life test qualification requirements after a few cycles. The mechanisms include the hinges, motors and bearings for deployment, release mechanisms, latches, release springs and support shops. Performance testing can be difficult and expensive but must be accomplished. A long-life lubricated mechanisms requires up to 5 years of life testing, or 10 to 100 years of successful flight. The long-life mechanisms include reaction wheels, momentum wheels, antenna gimbals, solar array drives, gyros and despin mechanisms. Several instances of how a mechanisms failed either in test, or in space use, and the lessons learned from these failures are reviewed. The effect of the movement away from CFC-113 cleaning solvent to ODC (Ozone-Depleting Chemical) -free is reviewed, and some of the alternatives are discussed.

  2. Webinar Presentation: Phthalates Exposures through Diet: Lessons Learned

    EPA Pesticide Factsheets

    This presentation, Phthalates Exposures through Diet: Lessons Learned, was given at the NIEHS/EPA Children's Centers 2015 Webinar Series: Phthalates in the Diet and in our Homes held on June 10, 2015.

  3. Effects of Providing a Rationale for Learning a Lesson on Students' Motivation and Learning in Online Learning Environments

    ERIC Educational Resources Information Center

    Shin, Tae Seob

    2010-01-01

    This study examined whether providing a rationale for learning a particular lesson influences students' motivation and learning in online learning environments. A mixed-method design was used to investigate the effects of two types of rationales (former student vs. instructor rationales) presented in an online introductory educational psychology…

  4. Japanese Lesson Study Sustaining Teacher Learning in the Classroom Context

    ERIC Educational Resources Information Center

    Loose, Crystal Corle

    2014-01-01

    The purposes of this action research study were first to explore teacher perceptions of Japanese lesson study as a method of professional development, and second to take teachers through an action research process as they observed the implementation of a literacy lesson in the classroom. Situated Learning Theory, particularly related to teacher…

  5. Scheduling lessons learned from the Autonomous Power System

    NASA Technical Reports Server (NTRS)

    Ringer, Mark J.

    1992-01-01

    The Autonomous Power System (APS) project at NASA LeRC is designed to demonstrate the applications of integrated intelligent diagnosis, control, and scheduling techniques to space power distribution systems. The project consists of three elements: the Autonomous Power Expert System (APEX) for Fault Diagnosis, Isolation, and Recovery (FDIR); the Autonomous Intelligent Power Scheduler (AIPS) to efficiently assign activities start times and resources; and power hardware (Brassboard) to emulate a space-based power system. The AIPS scheduler was tested within the APS system. This scheduler is able to efficiently assign available power to the requesting activities and share this information with other software agents within the APS system in order to implement the generated schedule. The AIPS scheduler is also able to cooperatively recover from fault situations by rescheduling the affected loads on the Brassboard in conjunction with the APEX FDIR system. AIPS served as a learning tool and an initial scheduling testbed for the integration of FDIR and automated scheduling systems. Many lessons were learned from the AIPS scheduler and are now being integrated into a new scheduler called SCRAP (Scheduler for Continuous Resource Allocation and Planning). This paper will service three purposes: an overview of the AIPS implementation, lessons learned from the AIPS scheduler, and a brief section on how these lessons are being applied to the new SCRAP scheduler.

  6. The Joint Lessons Learned System and Interoperability

    DTIC Science & Technology

    1989-06-02

    Learned: 1988-1989 As mentioned in the introduction to this chaoter, the Organizacion of the JcinC Chiefs cf Staff .OJCS) ueren significant transformatioi...Organization and Functions Manual . Washington, D.C.: HQDA, Office of the Deputy Chief 0f Staff for Operations and Plans, June 1984. ’..S. Army. Concept...U.S. Department of Defense. Joint Universal Lessons Learned System (JULLS) User’s Manual . Orlando, Florida: University of Central Florida, Institute

  7. Systems Engineering Lessons Learned from Solar Array Structures and Mechanisms Deployment

    NASA Technical Reports Server (NTRS)

    Vipavetz, Kevin; Kraft, Thomas

    2013-01-01

    This report has been developed by the National Aeronautics and Space Administration (NASA) Human Exploration and Operations Mission Directorate (HEOMD) Risk Management team in close coordination with the Engineering Directorate at LaRC. This document provides a point-in-time, cumulative, summary of actionable key lessons learned derived from the design project. Lessons learned invariably address challenges and risks and the way in which these areas have been addressed. Accordingly the risk management thread is woven throughout the document.

  8. Space Shuttle Reusable Solid Rocket Motor Program Overview and Lessons Learned

    NASA Technical Reports Server (NTRS)

    Graves, Stan R.; McCool, Alex (Technical Monitor)

    2001-01-01

    An overview of the Space Shuttle Reusable Solid Rocket Motor (RSRM) program is provided with a summary of lessons learned since the first test firing in 1977. Fifteen different lessons learned are discussed that fundamentally changed the motor's design, processing, and RSRM program risk management systems. The evolution of the rocket motor design is presented including the baseline or High Performance Solid Rocket Motor (HPM), the Filament Wound Case (FWC), the RSRM, and the proposed Five-Segment Booster (FSB).

  9. Web Cast on Arsenic Demonstration Program: Lessons Learned

    EPA Science Inventory

    Web cast presentation covered 10 Lessons Learned items selected from the Arsenic Demonstration Program with supporting information. The major items discussed include system design and performance items and the cost of the technologies.

  10. Lessons Learned from the Private Sector

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robichaud, Robert J

    This session is focused on lessons learned from private sector energy projects that could be applied to the federal sector. This presentation tees up the subsequent presentations by outlining the differences between private and federal sectors in objectives, metrics for determining success, funding resources/mechanisms, payback and ROI evaluation, risk tolerance/aversion, new technology adoption perspectives, and contracting mechanisms.

  11. Retrieval Lesson Learned from NAST-I Hyperspectral Data

    NASA Technical Reports Server (NTRS)

    Zhou, Daniel K.; Smith, William L.; Liu, Xu; Larar, Allen M.; Mango, Stephen A.

    2007-01-01

    The retrieval lesson learned is important to many current and future hyperspectral remote sensors. Validated retrieval algorithms demonstrate the advancement of hyperspectral remote sensing capabilities to be achieved with current and future satellite instruments.

  12. Applying Universal Design for Learning to Instructional Lesson Planning

    ERIC Educational Resources Information Center

    McGhie-Richmond, Donna; Sung, Andrew N.

    2013-01-01

    Universal Design for Learning is a framework for developing inclusive instructional lesson plans. The effects of introducing Universal Design for Learning Principles and Guidelines in a university teacher education program with pre-service and practicing teachers were explored in a mixed methods approach. The results indicate that the study…

  13. Safety Assurances at Space Test Centres: Lessons Learned

    NASA Astrophysics Data System (ADS)

    Alarcon Ruiz, Raul; O'Neil, Sean; Valls, Rafel Prades

    2010-09-01

    The European Space Agency’s(ESA) experts in quality, cleanliness and contamination control, safety, test facilities and test methods have accumulated valuable experience during the performance of dedicated audits of space test centres in Europe over a period of 10 years. This paper is limited to a summary of the safety findings and provides a valuable reference to the lessons learned, identifying opportunities for improvement in the areas of risk prevention measures associated to the safety of all test centre personnel, the test specimen, the test facilities and associated infrastructure. Through the analysis of the audit results the authors present what are the main lessons learned, and conclude how an effective safety management system will contribute to successful test campaigns and have a positive impact on the cost and schedule of space projects.

  14. MODIS Science Algorithms and Data Systems Lessons Learned

    NASA Technical Reports Server (NTRS)

    Wolfe, Robert E.; Ridgway, Bill L.; Patt, Fred S.; Masuoka, Edward J.

    2009-01-01

    For almost 10 years, standard global products from NASA's Earth Observing System s (EOS) two Moderate Resolution Imaging Spectroradiometer (MODIS) sensors are being used world-wide for earth science research and applications. This paper discusses the lessons learned in developing the science algorithms and the data systems needed to produce these high quality data products for the earth sciences community. Strong science team leadership and communication, an evolvable and scalable data system, and central coordination of QA and validation activities enabled the data system to grow by two orders of magnitude from the initial at-launch system to the current system able to reprocess data from both the Terra and Aqua missions in less than a year. Many of the lessons learned from MODIS are already being applied to follow-on missions.

  15. Learning To Serve, Serving To Learn: A View from Higher Education. Integrating Service-Learning into Curriculum: Lessons Learned. Teacher Education Consortium in Service-Learning.

    ERIC Educational Resources Information Center

    2003

    This collection of papers includes lessons learned from a 3-year collaboration among faculty who had pursued a scholarly inquiry of service-learning, integrated service-learning into their curricula, altered their teaching, forged partnerships with community based organizations, and developed measures and methodologies for assessing results. The…

  16. Two Approaches to Distance Education: Lessons Learned.

    ERIC Educational Resources Information Center

    Sedlak, Robert A.; Cartwright, G. Phillip

    1997-01-01

    Outlines lessons learned by the University of Wisconsin-Stout in implementing two distance education programs, a technology program using interactive television and a hospitality program using Lotus Notes to deliver courses. Topics discussed include program concept vs. technology as stimulus for innovation, program planning/administration,…

  17. Receiver System: Lessons Learned from Solar Two

    NASA Astrophysics Data System (ADS)

    Litwin, R. Z.

    2002-03-01

    The Boeing Company fabricated the Solar Two receiver as a subcontractor for the Solar Two project. The receiver absorbed sunlight reflected from the heliostat field. A molten-nitrate-salt heat transfer fluid was pumped from a storage tank at grade level, heated from 290 to 565DGC by the receiver mounted on top of a tower, then flowed back down into another storage tank. To make electricity, the hot salt was pumped through a steam generator to produce steam that powered a conventional Rankine steam turbine/generator. This evaluation identifies the most significant Solar Two receiver system lessons learned from the Mechanical Design, Instrumentation and Control, Panel Fabrication, Site Construction, Receiver System Operation, and Management from the perspective of the receiver designer/manufacturer. The lessons learned on the receiver system described here consist of two parts: the Problem and one or more identified Solutions. The appendix summarizes an inspection of the advanced receiver panel developed by Boeing that was installed and operated in the Solar Two receiver.

  18. Learning from Lessons: studying the structure and construction of mathematics teacher knowledge in Australia, China and Germany

    NASA Astrophysics Data System (ADS)

    Chan, Man Ching Esther; Clarke, David J.; Clarke, Doug M.; Roche, Anne; Cao, Yiming; Peter-Koop, Andrea

    2018-03-01

    The major premise of this project is that teachers learn from the act of teaching a lesson. Rather than asking "What must a teacher already know in order to practice effectively?", this project asks "What might a teacher learn through their activities in the classroom and how might this learning be optimised?" In this project, controlled conditions are created utilising purposefully designed and trialled lesson plans to investigate the process of teacher knowledge construction, with teacher selective attention proposed as a key mediating variable. In order to investigate teacher learning through classroom practice, the project addresses the following questions: To what classroom objects, actions and events do teachers attend and with what consequence for their learning? Do teachers in different countries attend to different classroom events and consequently derive different learning benefits from teaching a lesson? This international project combines focused case studies with an online survey of mathematics teachers' selective attention and consequent learning in Australia, China and Germany. Data include the teacher's adaptation of a pre-designed lesson, the teacher's actions during the lesson, the teacher's reflective thoughts about the lesson and, most importantly, the consequences for the planning and delivery of a second lesson. The combination of fine-grained, culturally situated case studies and large-scale online survey provides mutually informing benefits from each research approach. The research design, so constituted, offers the means to a new and scalable vision of teacher learning and its promotion.

  19. VLT/I Instrumentation: Lessons Learned FORUM

    NASA Astrophysics Data System (ADS)

    Monnet, G.; Bacon, R.

    2003-09-01

    This paper is the result of a joint effort by ESO and its Scientific and Technical Committee (STC) to extract the main lessons from last April's 'VLT/VLTI Instrumentation: Lessons learned' Forum and start applying them, in particular in the framework of the development of second generation VLT -and soon VLTI- instruments. This is but one step in a continuing effort to optimize these complex and challenging developments which involve a significant fraction of Europe's astronomical instrument builders in the near-UV to mid-IR range. With a major effort in the European radio community to build multiple receiver systems for ALMA now being pursued at an accelerated pace, it was also vital to revisit very quickly our whole procurement strategy in this area.

  20. Lessons learned in the development of the STOL intelligent tutoring system

    NASA Technical Reports Server (NTRS)

    Seamster, Thomas; Baker, Clifford; Ames, Troy

    1991-01-01

    Lessons learned during the development of the NASA Systems Test and Operations Language (STOL) Intelligent Tutoring System (ITS), being developed at NASA Goddard Space Flight Center are presented. The purpose of the intelligent tutor is to train STOL users by adapting tutoring based on inferred student strengths and weaknesses. This system has been under development for over one year and numerous lessons learned have emerged. These observations are presented in three sections, as follows. The first section addresses the methodology employed in the development of the STOL ITS and briefly presents the ITS architecture. The second presents lessons learned, in the areas of: intelligent tutor development; documentation and reporting; cost and schedule control; and tools and shells effectiveness. The third section presents recommendations which may be considered by other ITS developers, addressing: access, use and selection of subject matter experts; steps involved in ITS development; use of ITS interface design prototypes as part of knowledge engineering; and tools and shells effectiveness.

  1. Planning to Serve: Using Backwards Planning to Design Service-Learning Lesson Plans in the Preservice Curriculum

    ERIC Educational Resources Information Center

    Stiler, Gary

    2009-01-01

    The author describes how the Understanding by Design (backwards planning) lesson plan format was used by his preservice K-12 students to develop service-learning lesson plans. Preservice teachers in a multicultural education course were given an assignment to develop service-learning lesson plans using the Understanding by Design planning process.…

  2. 77 FR 46127 - Interim Staff Guidance on Changes to the Generic Aging Lessons Learned (GALL) Report Revision 2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-02

    ... Aging Lessons Learned (GALL) Report Revision 2 AMP XI.M41, ``Buried and Underground Piping and Tanks... AMPs in NUREG-1801, Revision 2, ``Generic Aging Lessons Learned (GALL) Report,'' and the NRC staff's... issues LR-ISG to communicate insights and lessons learned and to address emergent issues not covered in...

  3. Lessons Learned: Reflections of a University President

    ERIC Educational Resources Information Center

    Bowen, William G.

    2010-01-01

    "Lessons Learned" gives unprecedented access to the university president's office, providing a unique set of reflections on the challenges involved in leading both research universities and liberal arts colleges. In this landmark book, William Bowen, former president of Princeton University and of the Andrew W. Mellon Foundation, and…

  4. Reinventing Teacher Professional Norms and Identities: The Role of Lesson Study and Learning Communities

    ERIC Educational Resources Information Center

    Lieberman, Joanne

    2009-01-01

    The present article addresses how lesson study can facilitate changing traditional norms of individualism, conservatism and presentism that constrain American teachers from learning from one another. The article investigates how lesson study can serve as a vehicle for developing teacher learning communities by developing or redeveloping teachers'…

  5. Lessons Learned from Optical Payload for Lasercomm Science (OPALS) Mission Operations

    NASA Technical Reports Server (NTRS)

    Sindiy, Oleg V.; Abrahamson, Matthew J.; Biswas, Abhijit; Wright, Malcolm W.; Padams, Jordan H.; Konyha, Alexander L.

    2015-01-01

    This paper provides an overview of Optical Payload for Lasercomm Science (OPALS) activities and lessons learned during mission operations. Activities described cover the periods of commissioning, prime, and extended mission operations, during which primary and secondary mission objectives were achieved for demonstrating space-to-ground optical communications. Lessons learned cover Mission Operations System topics in areas of: architecture verification and validation, staffing, mission support area, workstations, workstation tools, interfaces with support services, supporting ground stations, team training, procedures, flight software upgrades, post-processing tools, and public outreach.

  6. From the Games Industry: Ten Lessons for Game-Based Learning

    ERIC Educational Resources Information Center

    Hollins, Paul; Whitton, Nicola

    2011-01-01

    This paper draws on lessons learned from the development process of the entertainment games industry and discusses how they can be applied to the field of game-based learning. This paper examines policy makers and those wishing to commission or develop games for learning and highlights potential opportunities as well as pitfalls. The paper focuses…

  7. Bee SAFE, a Skill-Building Intervention to Enhance CAM Health Literacy: Lessons Learned.

    PubMed

    Shreffler-Grant, Jean; Nichols, Elizabeth G; Weinert, Clarann

    2018-05-01

    The purpose is to describe a feasibility study of a skill-building intervention to enhance health literacy about complementary and alternative (CAM) therapies among older rural adults and share lessons learned. A study was designed to examine the feasibility of an intervention to enhance CAM health literacy. The theme was "Bee SAFE" for Be a wise user of CAM, Safety, Amount, From where, and Effect. Modules were presented face to face and by webinar with older adults at a senior center in one small rural community. The team achieved its purpose of designing, implementing, and evaluating the intervention and assessing if it could be implemented in a rural community. The implementation challenges encountered and lessons learn are discussed. By improving CAM health literacy, older rural adults with chronic health conditions can make well-reasoned decisions about using CAM for health promotion and illness management. The goal is to implement the Bee SAFE intervention in other rural communities; thus team members were attentive to lessons to be learned before investing time, effort, and expense in the larger intervention. It is hoped that the lessons learned can be instructive to others planning projects in rural communities.

  8. Ares I-X Thermal Model Correlation and Lessons Learned

    NASA Technical Reports Server (NTRS)

    Amundsen, Ruth M.

    2010-01-01

    The Ares I-X vehicle launched and flew successfully on October 28, 2009. This paper will describe the correlation of the vehicle thermal model to both ground testing and flight data. A main purpose of the vehicle model and ground testing was to ensure that the avionics within the vehicle were held within their thermal limits prior to launch and during flight. The correlation of the avionics box temperatures will be shown. Also, the lessons learned in the thermal discipline during the modeling, test, correlation to test, and flight of the Ares I-X flight test vehicle will be described. Lessons learned will cover thermal modeling, as well as management of the thermal discipline, thermal team, and thermal-related actions in design, testing, and flight.

  9. Effective Contracting: Trends and Lessons-Learned

    DTIC Science & Technology

    2011-01-25

    present a briefing on their current state of medical contracting; covering trends and lessons- learned from over the past 24 months. Their perspective...basing • Future opportunities in the MHS with a focus on strategic sourcing. • SECDEF guidance 2011 MHS Conference HCAA Mission To provide sound...including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing

  10. Gemini Observatory base facility operations: systems engineering process and lessons learned

    NASA Astrophysics Data System (ADS)

    Serio, Andrew; Cordova, Martin; Arriagada, Gustavo; Adamson, Andy; Close, Madeline; Coulson, Dolores; Nitta, Atsuko; Nunez, Arturo

    2016-08-01

    Gemini North Observatory successfully began nighttime remote operations from the Hilo Base Facility control room in November 2015. The implementation of the Gemini North Base Facility Operations (BFO) products was a great learning experience for many of our employees, including the author of this paper, the BFO Systems Engineer. In this paper we focus on the tailored Systems Engineering processes used for the project, the various software tools used in project support, and finally discuss the lessons learned from the Gemini North implementation. This experience and the lessons learned will be used both to aid our implementation of the Gemini South BFO in 2016, and in future technical projects at Gemini Observatory.

  11. Bringing authentic service learning to the classroom: benefits and lessons learned

    NASA Astrophysics Data System (ADS)

    Chamberlain, Leslie C.

    2016-06-01

    Project-based learning, which has gained significant attention within K-12 education, provides rich hands-on experiences for students. Bringing an element of service to the projects allow students to engage in a local or global community, providing an abundance of benefits to the students’ learning. For example, service projects build confidence, increase motivation, and exercise problem-solving and communication skills in addition to developing a deep understanding of content. I will present lessons I have learned through four years of providing service learning opportunities in my classroom. I share ideas for astronomy projects, tips for connecting and listening to a community, and helpful guidelines to hold students accountable in order to ensure a productive and educational project.

  12. James Webb Space Telescope - Applying Lessons Learned to I&T

    NASA Technical Reports Server (NTRS)

    Johns, Alan; Seaton, Bonita; Gal-Edd, Jonathan; Jones, Ronald; Fatig, Curtis; Wasiak, Francis

    2008-01-01

    The James Webb Space Telescope (JWST) is part of a new generation of spacecraft acquiring large data volumes from remote regions in space. To support a mission such as the JWST, it is imperative that lessons learned from the development of previous missions such as the Hubble Space Telescope and the Earth Observing System mission set be applied throughout the development and operational lifecycles. One example of a key lesson that should be applied is that core components, such as the command and telemetry system and the project database, should be developed early, used throughout development and testing, and evolved into the operational system. The purpose of applying lessons learned is to reap benefits in programmatic or technical parameters such as risk reduction, end product quality, cost efficiency, and schedule optimization. In the cited example, the early development and use of the operational command and telemetry system as well as the establishment of the intended operational database will allow these components to be used by the developers of various spacecraft components such that development, testing, and operations will all use the same core components. This will reduce risk through the elimination of transitions between development and operational components and improve end product quality by extending the verification of those components through continual use. This paper will discuss key lessons learned that have been or are being applied to the JWST Ground Segment integration and test program.

  13. 77 FR 55230 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-01; Compliance With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0068] Japan Lessons-Learned Project Directorate Interim... Commission (NRC). ACTION: Japan Lessons-Learned Project Directorate interim staff guidance; issuance. SUMMARY...-Learned Project Directorate Interim Staff Guidance (JLD-ISG), JLD-ISG-2012-01, ``Compliance with Order EA...

  14. 77 FR 55232 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-03; Compliance With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0067] Japan Lessons-Learned Project Directorate Interim...-Learned Project Directorate Interim Staff Guidance; issuance. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing the Final Japan Lessons-Learned Project Directorate (JLD...

  15. 77 FR 55231 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-02; Compliance With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0069] Japan Lessons-Learned Project Directorate Interim...-Learned Project Directorate interim staff guidance; issuance. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing the Final Japan Lessons-Learned Project Directorate Interim...

  16. Pregnancy and Parenting Support for Incarcerated Women: Lessons Learned

    PubMed Central

    Shlafer, Rebecca J.; Gerrity, Erica; Duwe, Grant

    2017-01-01

    Background There are more than 200,000 incarcerated women in U.S. prisons and jails, and it is estimated that 6% to 10% are pregnant. Pregnant incarcerated women experience complex risks that can compromise their health and the health of their offspring. Objectives Identify lessons learned from a community–university pilot study of a prison-based pregnancy and parenting support program. Methods A community–university–corrections partnership was formed to provide education and support to pregnant incarcerated women through a prison-based pilot program. Evaluation data assessed women’s physical and mental health concerns and satisfaction with the program. Between October 2011 and December 2012, 48 women participated. Lessons Learned We learned that providing services for pregnant incarcerated women requires an effective partnership with the Department of Corrections, adaptations to traditional community-based participatory research (CBPR) approaches, and resources that support both direct service and ongoing evaluation. Conclusions Effective services for pregnant incarcerated women can be provided through a successful community– university–corrections partnership. PMID:26548788

  17. Hydrogen Fuel Cell Analysis: Lessons Learned from Stationary Power Generation Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Scott E. Grasman; John W. Sheffield; Fatih Dogan

    2010-04-30

    This study considered opportunities for hydrogen in stationary applications in order to make recommendations related to RD&D strategies that incorporate lessons learned and best practices from relevant national and international stationary power efforts, as well as cost and environmental modeling of pathways. The study analyzed the different strategies utilized in power generation systems and identified the different challenges and opportunities for producing and using hydrogen as an energy carrier. Specific objectives included both a synopsis/critical analysis of lessons learned from previous stationary power programs and recommendations for a strategy for hydrogen infrastructure deployment. This strategy incorporates all hydrogen pathways andmore » a combination of distributed power generating stations, and provides an overview of stationary power markets, benefits of hydrogen-based stationary power systems, and competitive and technological challenges. The motivation for this project was to identify the lessons learned from prior stationary power programs, including the most significant obstacles, how these obstacles have been approached, outcomes of the programs, and how this information can be used by the Hydrogen, Fuel Cells & Infrastructure Technologies Program to meet program objectives primarily related to hydrogen pathway technologies (production, storage, and delivery) and implementation of fuel cell technologies for distributed stationary power. In addition, the lessons learned address environmental and safety concerns, including codes and standards, and education of key stakeholders.« less

  18. Space Station Control Moment Gyroscope Lessons Learned

    NASA Technical Reports Server (NTRS)

    Gurrisi, Charles; Seidel, Raymond; Dickerson, Scott; Didziulis, Stephen; Frantz, Peter; Ferguson, Kevin

    2010-01-01

    Four 4760 Nms (3510 ft-lbf-s) Double Gimbal Control Moment Gyroscopes (DGCMG) with unlimited gimbal freedom about each axis were adopted by the International Space Station (ISS) Program as the non-propulsive solution for continuous attitude control. These CMGs with a life expectancy of approximately 10 years contain a flywheel spinning at 691 rad/s (6600 rpm) and can produce an output torque of 258 Nm (190 ft-lbf)1. One CMG unexpectedly failed after approximately 1.3 years and one developed anomalous behavior after approximately six years. Both units were returned to earth for failure investigation. This paper describes the Space Station Double Gimbal Control Moment Gyroscope design, on-orbit telemetry signatures and a summary of the results of both failure investigations. The lessons learned from these combined sources have lead to improvements in the design that will provide CMGs with greater reliability to assure the success of the Space Station. These lessons learned and design improvements are not only applicable to CMGs but can be applied to spacecraft mechanisms in general.

  19. Lunar Prospector: First Results and Lessons Learned

    NASA Astrophysics Data System (ADS)

    Scott Hubbard, G.; Feldman, William; Cox, Sylvia A.; Smith, Marcie A.; Chu-Thielbar, Lisa

    2002-01-01

    Lunar Prospector, the first competitively selected mission in NASA's Discovery Program, is conducting a one-year orbital survey of the Moon's composition and structure. Launched on January 6 1998, the suite of five instruments is measuring water/ice to a sensitivity of 50 ppm (hydrogen), detecting key elemental constituents, gas release events and mapping the Moon's gravitational and magnetic fields. The mission is described with emphasis on the first scientific results and lessons learned from managing a very low cost project. A mission overview and systems description is given along with final mission trajectories. Lessons learned from government-industry teaming, new modes of project management, and novel contractual arrangements are discussed. The suite of five instruments (neutron spectrometer, alpha particle spectrometer, gamma-ray spectrometer, electron reflectometer and magnetometer) is outlined with attention to final technical performance as well as development on a constrained budget and schedule. A review of our novel approaches to education and public outreach is discussed and a summary with suggestions and implications for future missions is provided.

  20. Receiver System: Lessons Learned From Solar Two

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LITWIN, ROBERT Z.; PACHECO, JAMES E.

    The Boeing Company fabricated the Solar Two receiver as a subcontractor for the Solar Two project. The receiver absorbed sunlight reflected from the heliostat field. A molten-nitrate-salt heat transfer fluid was pumped from a storage tank at grade level, heated from 290 to 565 C by the receiver mounted on top of a tower, then flowed back down into another storage tank. To make electricity, the hot salt was pumped through a steam generator to produce steam that powered a conventional Rankine steam turbine/generator. This evaluation identifies the most significant Solar Two receiver system lessons learned from the Mechanical Design,more » Instrumentation and Control, Panel Fabrication, Site Construction, Receiver System Operation, and Management from the perspective of the receiver designer/manufacturer. The lessons learned on the receiver system described here consist of two parts: the Problem and one or more identified Solutions. The appendix summarizes an inspection of the advanced receiver panel developed by Boeing that was installed and operated in the Solar Two receiver.« less

  1. Apollo 1 Lessons Learned Show

    NASA Image and Video Library

    2017-01-27

    NASA Kennedy Space Center Director Bob Cabana, at left, moderates a panel discussion during the Apollo 1 Lessons Learned event in the Training Auditorium at NASA’s Kennedy Space Center in Florida. The theme of the presentation was "To There and Back Again." Answering questions are Ernie Reyes, retired, Apollo 1 senior operations engineer; and John Tribe, retired, Apollo 1 Reaction and Control System lead engineer. The event helped pay tribute to the Apollo 1 crew, Gus Grissom, Ed White II, and Roger Chaffee.

  2. Lessons Learned on "Scaling Up" of Projects

    ERIC Educational Resources Information Center

    Viadero, Debra

    2007-01-01

    Having developed a technology-based teaching unit on weather that appeared to work well for middle school students, Nancy Butler Songer and her colleagues at the University of Michigan decided in the late 1990s to take the next logical step in their research program: They scaled up. This article discusses lessons learned by several faculty…

  3. Columbines 10th Anniversary Finds Lessons Learned

    ERIC Educational Resources Information Center

    Trump, Kenneth S.

    2009-01-01

    When school administrators hear that the 10th anniversary of the Columbine High School attack is approaching, most shake their heads in disbelief. They are amazed that 10 years have passed since this watershed event, which changed the landscape of K-12 school safety. In this article, the author reflects on the lessons learned from the Columbine…

  4. Library 101: Why, How, and Lessons Learned

    ERIC Educational Resources Information Center

    Porter, Michael; King, David Lee

    2010-01-01

    This article describes how and why the Library 101 Project was created and the lessons that the developers learned out of this project. The Library 101 is a project that challenges librarians to revise the paradigm of "basic" library services in order to remain relevant in this technology-driven world. It was developed by Michael Porter,…

  5. Spelling Endings Added to e: Level III, Unit 5, Lesson 1; Capitalization: Lesson 2; Question Marks and Exclamation Points: Lesson 3; Quotation Marks: Lesson 4; Spelling Double Letter Demons: Lesson 5; Colons and Dashes: Lesson 6; Punctuating Series with Commas and Semicolons: Lesson 7; More Confusing Word Pairs: Lesson 8; Separating Sentence Parts with Punctuation: Lesson 9; Other Uses for Commas and Semicolons.

    ERIC Educational Resources Information Center

    Manpower Administration (DOL), Washington, DC. Job Corps.

    This self-study program for the high-school level contains lessons in the following subjects: Spelling Endings Added to e; Capitalization; Question Marks and Exclamation Points; Quotation Marks; Spelling Double Letter Demons; Colons and Dashes; Punctuating Series with Commas and Semicolons; More Confusing Word Pairs; Separating Sentence Parts with…

  6. Lessons learned in acquiring new regulations for shipping advanced electric vehicle batteries

    NASA Astrophysics Data System (ADS)

    Henriksen, Gary; Hammel, Carol; Altemos, Edward A.

    1994-12-01

    In 1990, the Electric and Hybrid Propulsion Division of the US Department of Energy established its ad hoc EV Battery Readiness Working Group to identify regulatory barriers to the commercialization of advanced EV battery technologies and facilitate the removal of these barriers. A Shipping Sub-Working Group (SSWG) was formed to address the regulatory issues associated with the domestic and international shipment of these new battery technologies. The SSWG invites major industrial developers of advanced battery technologies to join as members and work closely with appropriate domestic and international regulatory authorities to develop suitable regulations and procedures for the safe transport of these new battery technologies. This paper describes the domestic and international regulatory processes for the transport of dangerous goods; reviews the status of shipping regulations for sodium-beta and lithium batteries; and delineates the lessons learned to date in this process. The sodium-beta battery family was the first category of advanced EV batteries to be addressed by the SSWG. It includes both sodium/sulfur and sodium/metal chloride batteries. Their efforts led to the establishment of a UN number (UN 3292) in the UN Recommendations, for cold cells and batteries, and establishment of a US Department of Transportation general exemption (DOT-E-10917) covering cold and hot batteries, as well as cold cells. The lessons learned for sodium-beta batteries, over the period of 1990--94, are now being applied to the development of regulations for shipping a new generation of lithium battery technologies (lithium-polymer and lithium-aluminum/iron sulfide batteries).

  7. E-Learning and Development: Lessons from Multi-Disciplinary Capacity Strengthening

    ERIC Educational Resources Information Center

    Babu, Suresh Chandra

    2014-01-01

    This paper documents the experience and lessons from implementing an e-learning program aimed at creating multidisciplinary research capacity. It presents a case study of bringing together a multidisciplinary group of professionals on-line to learn the skills needed to be a successful researcher in the context of HIV/AIDS and food security…

  8. Apollo 1 Lessons Learned Show

    NASA Image and Video Library

    2017-01-27

    Charlie Duke, former Apollo 16 astronaut and member of the Apollo 1 Emergency Egress Investigation Team, speaks to participants during the Apollo 1 Lessons Learned presentation in the Training Auditorium at NASA's Kennedy Space Center in Florida. The program's theme was "To There and Back Again." Other guest panelists included Ernie Reyes, retired, Apollo 1 senior operations engineer; and John Tribe, retired, Apollo 1 Reaction and Control System lead engineer. The event helped pay tribute to the Apollo 1 crew, Gus Grissom, Ed White II, and Roger Chaffee.

  9. Apollo 1 Lessons Learned Show

    NASA Image and Video Library

    2017-01-27

    Kennedy Space Center Director Bob Cabana welcomes participants to the Apollo 1 Lessons Learned presentation in the Training Auditorium at NASA’s Kennedy Space Center in Florida. The program's theme was "To There and Back Again." Guest panelists included Charlie Duke, former Apollo 16 astronaut and member of the Apollo 1 Emergency Egress Investigation Team; Ernie Reyes, retired, Apollo 1 senior operations engineer; and John Tribe, retired, Apollo 1 Reaction and Control System lead engineer. The event helped pay tribute to the Apollo 1 crew, Gus Grissom, Ed White II, and Roger Chaffee.

  10. Unintended Learning in Primary School Practical Science Lessons from Polanyi's Perspective of Intellectual Passion

    NASA Astrophysics Data System (ADS)

    Park, Jisun; Song, Jinwoong; Abrahams, Ian

    2016-03-01

    This study explored, from the perspective of intellectual passion developed by Michael Polanyi, the unintended learning that occurred in primary practical science lessons. We use the term `unintended' learning to distinguish it from `intended' learning that appears in teachers' learning objectives. Data were collected using video and audio recordings of a sample of twenty-four whole class practical science lessons, taught by five teachers, in Korean primary schools with 10- to 12-year-old students. In addition, video and audio recordings were made for each small group of students working together in order to capture their activities and intra-group discourse. Pre-lesson interviews with the teachers were undertaken and audio-recorded to ascertain their intended learning objectives. Selected key vignettes, including unintended learning, were analysed from the perspective of intellectual passion developed by Polanyi. What we found in this study is that unintended learning could occur when students got interested in something in the first place and could maintain their interest. In addition, students could get conceptual knowledge when they tried to connect their experience to their related prior knowledge. It was also found that the processes of intended learning and of unintended learning were different. Intended learning was characterized by having been planned by the teacher who then sought to generate students' interest in it. In contrast, unintended learning originated from students' spontaneous interest and curiosity as a result of unplanned opportunities. Whilst teachers' persuasive passion comes first in the process of intended learning, students' heuristic passion comes first in the process of unintended learning. Based on these findings, we argue that teachers need to be more aware that unintended learning, on the part of individual students, can occur during their lesson and to be able to better use this opportunity so that this unintended learning can be

  11. Keeping Kids Smokefree: Lessons Learned on Community Participation

    ERIC Educational Resources Information Center

    Charlier, N.; Glover, M.; Robertson, J.

    2009-01-01

    Community participation in program decision-making and implementation is an ideal that community and academic stakeholders aspire to in participatory research. This ideal, however, can be difficult to achieve. We describe lessons learned about community participation from a quasi-experimental trial aimed at reducing the uptake of smoking among…

  12. Internet Architecture: Lessons Learned and Looking Forward

    DTIC Science & Technology

    2006-12-01

    Internet Architecture: Lessons Learned and Looking Forward Geoffrey G. Xie Department of Computer Science Naval Postgraduate School April 2006... Internet architecture. Report Documentation Page Form ApprovedOMB No. 0704-0188 Public reporting burden for the collection of information is...readers are referred there for more information about a specific protocol or concept. 2. Origin of Internet Architecture The Internet is easily

  13. Let's Cooperate! Integrating Cooperative Learning Into a Lesson on Ethics.

    PubMed

    Reineke, Patricia R

    2017-04-01

    Cooperative learning is an effective teaching strategy that promotes active participation in learning and can be used in academic, clinical practice, and professional development settings. This article describes that strategy and provides an example of its use in a lesson about ethics. J Contin Nurs Educ. 2017;48(4):154-156. Copyright 2017, SLACK Incorporated.

  14. Why undertake a pilot in a qualitative PhD study? Lessons learned to promote success.

    PubMed

    Wray, Jane; Archibong, Uduak; Walton, Sean

    2017-01-23

    Background Pilot studies can play an important role in qualitative studies. Methodological and practical issues can be shaped and refined by undertaking pilots. Personal development and researchers' competence are enhanced and lessons learned can inform the development and quality of the main study. However, pilot studies are rarely published, despite their potential to improve knowledge and understanding of the research. Aim To present the main lessons learned from undertaking a pilot in a qualitative PhD study. Discussion This paper draws together lessons learned when undertaking a pilot as part of a qualitative research project. Important methodological and practical issues identified during the pilot study are discussed including access, recruitment, data collection and the personal development of the researcher. The resulting changes to the final study are also highlighted. Conclusion Sharing experiences of and lessons learned in a pilot study enhances personal development, improves researchers' confidence and competence, and contributes to the understanding of research. Implications for practice Pilots can be used effectively in qualitative studies to refine the final design, and provide the researcher with practical experience to enhance confidence and competence.

  15. Performance evaluation of the Abbott CELL-DYN Ruby and the Sysmex XT-2000i haematology analysers.

    PubMed

    Leers, M P G; Goertz, H; Feller, A; Hoffmann, J J M L

    2011-02-01

    Two mid-range haematology analysers (Abbott CELL-DYN Ruby and Sysmex XT-2000i) were evaluated to determine their analytical performance and workflow efficiency in the haematology laboratory. In total 418 samples were processed for determining equivalence of complete blood count (CBC) measurements, and 100 for reticulocyte comparison. Blood smears served for assessing the agreement of the differential counts. Inter-instrument agreement for most parameters was good although small numbers of discrepancies were observed. Systematic biases were found for mean cell volume, reticulocytes, platelets and mean platelet volume. CELL-DYN Ruby WBC differentials were obtained with all samples while the XT-2000i suppressed differentials partially or completely in 13 samples (3.1%). WBC subpopulation counts were otherwise in good agreement with no major outliers. Following first-pass CBC/differential analysis, 88 (21%) of XT-2000i samples required further analyser processing compared to 18 (4.3%) for the CELL-DYN Ruby. Smear referrals for suspected WBC/nucleated red blood cells and platelet abnormalities were indicated for 106 (25.4%) and 95 (22.7%) of the XT-2000i and CELL-DYN Ruby samples respectively. Flagging efficiencies for both analysers were found to be similar. The Sysmex XT-2000i and Abbott CELL-DYN Ruby analysers have broadly comparable analytical performance, but the CELL-DYN Ruby showed superior first-pass efficiency. © 2010 Blackwell Publishing Ltd.

  16. Lessons We Learned Designing and Building the Chandra Telescope

    NASA Technical Reports Server (NTRS)

    Arenberg, Jonathan; Matthews, Gary; Atkinson, C.; Cohen, L.; Golisano, C.; Havey, K.; Hefner, K.; Jones, C.; Kegley, J.; Knollenberg, P.; hide

    2014-01-01

    2014 marks the crystal (15th) anniversary of the launch of the Chandra X-ray Observatory. This paper offers some of the major lessons learned by some of the key members of the Chandra Telescope team. We offer some of the lessons gleaned from our experiences developing, designing, building and testing the telescope and its subsystems, with 15 years of hindsight. Among the topics to be discussed are the early developmental tests, known as VETA-I and VETA-II, requirements derivation, the impact of late requirements and reflection on the conservatism in the design process.

  17. Delta clipper lessons learned for increased operability in reusable space vehicles

    NASA Astrophysics Data System (ADS)

    Charette, Ray O.; Steinmeyer, Don A.; Smiljanic, Ray R.

    1998-01-01

    Important lessons were learned from the design, development, and test (DD&T), and operation of the Delta Clipper Experimental (DC-X/XA) Reusable Launch Vehicle (RLV) which apply to increased operability for the operational Reusable Space Vehicles (RSVs). Boeing maintains a continuous process improvement program that provides the opportunity to ``institutionalize'' the results from projects such as Delta Clipper for application to product improvement in future programs. During the design phase, operations and supportability (O&S) were emphasized to ensure aircraft-like operations, traceable to an operational RSV. The operations personnel, flight, and ground crew and crew chief were actively involved in the design, manufacture, and checkout of the systems. Changes and additions to capability were implemented as they evolved from knowledge gained in each phase of development. This paper presents key lessons learned with respect to design and implementation of flight systems, propulsion, airframe, hydraulics, avionics, and ground operations. Information was obtained from discussions with personnel associated with this program concerning their experience and lessons learned. Additionally, field process records and operations timelines were evaluated for applicability to RSVs. The DC-X program pursued reusability in all aspects of the design, a unique approach in rocket system development.

  18. 77 FR 14446 - Changes to the Generic Aging Lessons Learned (GALL) Report Revision 2 AMP XI.M41, “Buried and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-09

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0055] Changes to the Generic Aging Lessons Learned (GALL... Aging Lessons Learned (GALL) Report,'' and the NRC staff's aging management review procedure and... into ADAMS. II. Background The NRC issues LR-ISGs to communicate insights and lessons learned and to...

  19. Project Interface Requirements Process Including Shuttle Lessons Learned

    NASA Technical Reports Server (NTRS)

    Bauch, Garland T.

    2010-01-01

    Most failures occur at interfaces between organizations and hardware. Processing interface requirements at the start of a project life cycle will reduce the likelihood of costly interface changes/failures later. This can be done by adding Interface Control Documents (ICDs) to the Project top level drawing tree, providing technical direction to the Projects for interface requirements, and by funding the interface requirements function directly from the Project Manager's office. The interface requirements function within the Project Systems Engineering and Integration (SE&I) Office would work in-line with the project element design engineers early in the life cycle to enhance communications and negotiate technical issues between the elements. This function would work as the technical arm of the Project Manager to help ensure that the Project cost, schedule, and risk objectives can be met during the Life Cycle. Some ICD Lessons Learned during the Space Shuttle Program (SSP) Life Cycle will include the use of hardware interface photos in the ICD, progressive life cycle design certification by analysis, test, & operations experience, assigning interface design engineers to Element Interface (EI) and Project technical panels, and linking interface design drawings with project build drawings

  20. Documentation for the “XT3D” option in the Node Property Flow (NPF) Package of MODFLOW 6

    USGS Publications Warehouse

    Provost, Alden M.; Langevin, Christian D.; Hughes, Joseph D.

    2017-08-10

    This report describes the “XT3D” option in the Node Property Flow (NPF) Package of MODFLOW 6. The XT3D option extends the capabilities of MODFLOW by enabling simulation of fully three-dimensional anisotropy on regular or irregular grids in a way that properly takes into account the full, three-dimensional conductivity tensor. It can also improve the accuracy of groundwater-flow simulations in cases in which the model grid violates certain geometric requirements. Three example problems demonstrate the use of the XT3D option to simulate groundwater flow on irregular grids and through three-dimensional porous media with anisotropic hydraulic conductivity.Conceptually, the XT3D method of estimating flow between two MODFLOW 6 model cells can be viewed in terms of three main mathematical steps: construction of head-gradient estimates by interpolation; construction of fluid-flux estimates by application of the full, three-dimensional form of Darcy’s Law, in which the conductivity tensor can be heterogeneous and anisotropic; and construction of the flow expression by enforcement of continuity of flow across the cell interface. The resulting XT3D flow expression, which relates the flow across the cell interface to the values of heads computed at neighboring nodes, is the sum of terms in which conductance-like coefficients multiply head differences, as in the conductance-based flow expression the NPF Package uses by default. However, the XT3D flow expression contains terms that involve “neighbors of neighbors” of the two cells for which the flow is being calculated. These additional terms have no analog in the conductance-based formulation. When assembled into matrix form, the XT3D formulation results in a larger stencil than the conductance-based formulation; that is, each row of the coefficient matrix generally contains more nonzero elements. The “RHS” suboption can be used to avoid expanding the stencil by placing the additional terms on the right-hand side

  1. The X-15 airplane - Lessons learned

    NASA Technical Reports Server (NTRS)

    Dana, William H.

    1993-01-01

    The X-15 rocket research airplane flew to an altitude of 354,000 ft and reached Mach 6.70. In almost 200 flights, this airplane was used to gather aerodynamic-heating, structural loads, stability and control, and atmospheric-reentry data. This paper describes the origins, design, and operation of the X-15 airplane. In addition, lessons learned from the X-15 airplane that are applicable to designing and testing the National Aero-Space Plane are discussed.

  2. 2010 CEOS Field Reflectance Intercomparisons Lessons Learned

    NASA Technical Reports Server (NTRS)

    Thome, Kurtis; Fox, Nigel

    2011-01-01

    This paper summarizes lessons learned from the 2009 and 2010 joint field campaigns to Tuz Golu, Turkey. Emphasis is placed on the 2010 campaign related to understanding the equipment and measurement protocols, processing schemes, and traceability to SI quantities. Participants in both 2009 and 2010 used an array of measurement approaches to determine surface reflectance. One lesson learned is that even with all of the differences in collection between groups, the differences in reflectance are currently dominated by instrumental artifacts including knowledge of the white reference. Processing methodology plays a limited role once the bi-directional reflectance of the white reference is used rather than a hemispheric-directional value. The lack of a basic set of measurement protocols, or best practices, limits a group s ability to ensure SI traceability and the development of proper error budgets. Finally, rigorous attention to sampling methodology and its impact on instrument behavior is needed. The results of the 2009 and 2010 joint campaigns clearly demonstrate both the need and utility of such campaigns and such comparisons must continue in the future to ensure a coherent set of data that can span multiple sensor types and multiple decades.

  3. Integrating the Core Curriculum through Cooperative Learning. Lesson Plans for Teachers.

    ERIC Educational Resources Information Center

    Winget, Patricia L., Ed.

    Cooperative learning strategies are used to facilitate the integration of multicultural and multi-ability level students into California regular education classrooms. This handbook is a sampling of innovative lesson plans using cooperative learning activities developed by teachers to incorporate the core curriculum into their instruction. Three…

  4. University Educators' Instructional Choices and Their Learning Styles within a Lesson Framework

    ERIC Educational Resources Information Center

    Mazo, Lucille B.

    2017-01-01

    Research on learning styles often focuses on the learning style of the student; however, the learning style of the educator may affect instructional choices and student learning. Few studies have addressed the lack of knowledge that exists in universities with respect to educators' learning styles and a lesson framework (development, delivery, and…

  5. Lessons Learned

    PubMed Central

    Davis, Michaela

    2015-01-01

    The public health nurses’ scope of practice explicitly includes child protection within their role, which places them in a prime position to identify child protection concerns. This role compliments that of other professions and voluntary agenices who work with children. Public health nurses are in a privileged position as they form a relationship with the child’s parent(s)/guardian(s) and are able to see the child in its own environment, which many professionals cannot. Child protection in Ireland, while influenced by other countries, has progressed through a distinct pathway that streamlined protocols and procedures. However, despite the above serious failures have occurred in the Irish system, and inquiries over the past 20 years persistently present similar contributing factors, namely, the lack of standardized and comprehensive service responses. Moreover, poor practice is compounded by the lack of recognition of the various interactional processes taking place within and between the different agencies of child protection, leading to psychological barriers in communication. This article will explore the lessons learned for public health nurses practice in safeguarding children in the Republic of Ireland. PMID:27335944

  6. Lessons Learned from Becoming an Independent Standards Board.

    ERIC Educational Resources Information Center

    Board, John C.

    This paper discusses lessons learned from becoming an independent standards board. It begins by explaining that teachers lacked adequate academic preparation during the two World Wars and shortly thereafter. At the end of World War II, public education had to deal with poor pay, little job security, inadequate pensions, and inadequate and…

  7. Lessons learned: clinicians' post-occupancy perspective of facility design involvement.

    PubMed

    Reno, Kathy; Okland, Kathy; Finis, Nanne; Lamantia, Gina; Call, Roger; Cardon, Kerrie; Gerber, Deborah; Zeigler, Janet

    2014-01-01

    The research was conducted to determine clinician knowledge needs for competent involvement with the facility design process as well as to gather lessons learned on building stronger design teams. As clinical stakeholders are invited to the healthcare facility design table, the question arises as to the ability of professionally diverse team members to translate each other's comments and ideas accurately. In the past, hospitals were designed by a handful of hospital leaders and architects. More recently, multiple players have become involved throughout the design and construction of new healthcare facilities. Clinical consultants from two international healthcare companies observed that many clinicians were unprepared to effectively translate their needs to the architectural community or to competently utilize architectural tools and documents. A qualitative, post-occupancy cross-case study was conducted to understand how clinicians could increase their competencies for successful involvement in facility design. Focus group interviews were held with teams from healthcare facilities occupying their new facility for more than 6 months and less than 2 years. Curriculum topics were validated and additional areas recommended based on the interviews. Open-ended questioins on lessons learned provided several new dimensions to the research. Although validating the curriculum was the initial intent, the feedback from the focus groups on lessons learned provided rich concepts for practice implications and further research on post-occupancy. Decision-making, design process, interdisciplinary, planning, post-occupancy.

  8. Lessons Learned from Introducing Social Media Use in Undergraduate Economics Research

    ERIC Educational Resources Information Center

    O'Brien, Martin; Freund, Katarina

    2018-01-01

    The research process and associated literacy requirements are often unfamiliar and daunting obstacles for undergraduate students. The use of social media has the potential to assist research training and encourage active learning, social inclusion and student engagement. This paper documents the lessons learned from developing a blended learning…

  9. Comparison of acute elastic recoil between the SAPIEN-XT and SAPIEN valves in transfemoral-transcatheter aortic valve replacement.

    PubMed

    Garg, Aatish; Parashar, Akhil; Agarwal, Shikhar; Aksoy, Olcay; Hammadah, Muhammad; Poddar, Kanhaiya Lal; Puri, Rishi; Svensson, Lars G; Krishnaswamy, Amar; Tuzcu, E Murat; Kapadia, Samir R

    2015-02-15

    The SAPIEN-XT is a newer generation balloon-expandable valve created of cobalt chromium frame, as opposed to the stainless steel frame used in the older generation SAPIEN valve. We sought to determine if there was difference in acute recoil between the two valves. All patients who underwent transfemoral-transcatheter aortic valve replacement using the SAPIEN-XT valve at the Cleveland Clinic were included. Recoil was measured using biplane cine-angiographic image analysis of valve deployment. Acute recoil was defined as [(valve diameter at maximal balloon inflation) - (valve diameter after deflation)]/valve diameter at maximal balloon inflation (reported as percentage). Patients undergoing SAPIEN valve implantation were used as the comparison group. Among the 23 mm valves, the mean (standard deviation-SD) acute recoil was 2.77% (1.14) for the SAPIEN valve as compared to 3.75% (1.52) for the SAPIEN XT valve (P = 0.04). Among the 26 mm valves, the mean (SD) acute recoil was 2.85% (1.4) for the SAPIEN valve as compared to 4.32% (1.63) for the SAPIEN XT valve (P = 0.01). Multivariable linear regression analysis demonstrated significantly greater adjusted recoil in the SAPIEN XT valves as compared to the SAPIEN valves by 1.43% [(95% CI: 0.69-2.17), P < 0.001]. However, the residual peak gradient was less for SAPIEN XT compared to SAPIEN valves [18.86 mm Hg versus 23.53 mm Hg (P = 0.01)]. Additionally, no difference in paravalvular leak was noted between the two valve types (P = 0.78). The SAPIEN XT valves had significantly greater acute recoil after deployment compared to the SAPIEN valves. Implications of this difference in acute recoil on valve performance need to be investigated in future studies. © 2014 Wiley Periodicals, Inc.

  10. Apollo 1 Lessons Learned Show

    NASA Image and Video Library

    2017-01-27

    Suzy Cunningham, with the Communication and Public Engagement Directorate, sings the National Anthem before the start of the Apollo 1 Lessons Learned presentation in the Training Auditorium at NASA’s Kennedy Space Center in Florida. The program's theme was "To There and Back Again." Guest panelists included Charlie Duke, former Apollo 16 astronaut and member of the Apollo 1 Emergency Egress Investigation Team; Ernie Reyes, retired, Apollo 1 senior operations engineer; and John Tribe, retired, Apollo 1 Reaction and Control System lead engineer. The event helped pay tribute to the Apollo 1 crew, Gus Grissom, Ed White II, and Roger Chaffee.

  11. System safety management lessons learned from the US Army acquisition process

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Piatt, J.A.

    1989-05-01

    The Assistant Secretary of the Army for Research, Development and Acquisition directed the Army Safety Center to provide an audit of the causes of accidents and safety of use restrictions on recently fielded systems by tracking residual hazards back through the acquisition process. The objective was to develop lessons learned'' that could be applied to the acquisition process to minimize mishaps in fielded systems. System safety management lessons learned are defined as Army practices or policies, derived from past successes and failures, that are expected to be effective in eliminating or reducing specific systemic causes of residual hazards. They aremore » broadly applicable and supportive of the Army structure and acquisition objectives. Pacific Northwest Laboratory (PNL) was given the task of conducting an independent, objective appraisal of the Army's system safety program in the context of the Army materiel acquisition process by focusing on four fielded systems which are products of that process. These systems included the Apache helicopter, the Bradley Fighting Vehicle (BFV), the Tube Launched, Optically Tracked, Wire Guided (TOW) Missile and the High Mobility Multipurpose Wheeled Vehicle (HMMWV). The objective of this study was to develop system safety management lessons learned associated with the acquisition process. The first step was to identify residual hazards associated with the selected systems. Since it was impossible to track all residual hazards through the acquisition process, certain well-known, high visibility hazards were selected for detailed tracking. These residual hazards illustrate a variety of systemic problems. Systemic or process causes were identified for each residual hazard and analyzed to determine why they exist. System safety management lessons learned were developed to address related systemic causal factors. 29 refs., 5 figs.« less

  12. Lessons learned for composite structures

    NASA Technical Reports Server (NTRS)

    Whitehead, R. S.

    1991-01-01

    Lessons learned for composite structures are presented in three technology areas: materials, manufacturing, and design. In addition, future challenges for composite structures are presented. Composite materials have long gestation periods from the developmental stage to fully matured production status. Many examples exist of unsuccessful attempts to accelerate this gestation period. Experience has shown that technology transition of a new material system to fully matured production status is time consuming, involves risk, is expensive and should not be undertaken lightly. The future challenges for composite materials require an intensification of the science based approach to material development, extension of the vendor/customer interaction process to include all engineering disciplines of the end user, reduced material costs because they are a significant factor in overall part cost, and improved batch-to-batch pre-preg physical property control. Historical manufacturing lessons learned are presented using current in-service production structure as examples. Most producibility problems for these structures can be traced to their sequential engineering design. This caused an excessive emphasis on design-to-weight and schedule at the expense of design-to-cost. This resulted in expensive performance originated designs, which required costly tooling and led to non-producible parts. Historically these problems have been allowed to persist throughout the production run. The current/future approach for the production of affordable composite structures mandates concurrent engineering design where equal emphasis is placed on product and process design. Design for simplified assembly is also emphasized, since assembly costs account for a major portion of total airframe costs. The future challenge for composite manufacturing is, therefore, to utilize concurrent engineering in conjunction with automated manufacturing techniques to build affordable composite structures

  13. Lessons Learned JSC Micro-Wireless Instrumentation Systems on Space Shuttle and International Space Station CANEUS 2006

    NASA Technical Reports Server (NTRS)

    Studor, George

    2007-01-01

    A viewgraph presentation on lessons learned from NASA Johnson Space Center's micro-wireless instrumentation is shown. The topics include: 1) Background, Rationale and Vision; 2) NASA JSC/Structural Engineering Approach & History; 3) Orbiter Wing Leading Edge Impact Detection System; 4) WLEIDS Confidence and Micro-WIS Lessons Learned; and 5) Current Projects and Recommendations.

  14. Lessons Learned from Recent Failure and Incident Investigations of Composite Structures

    NASA Technical Reports Server (NTRS)

    Ransom, J. B.; Glaessgen, E. H.; Raju, L. S.; Knight, N. F., Jr.; Reeder, J. R.

    2008-01-01

    During the past few decades, NASA Langley Research Center (LaRC) has supported several large-scale failure and incident investigations and numerous requests for engineering consultations. Although various extenuating circumstances contributed to each of these incidents, in all cases, the failure resulted from accumulation and/or propagation of damage that reduced the load carrying capability of the structure to a level below that which was needed to sustain structural loads. A brief overview of various failure and incident investigations supported by LaRC, including some of the computational and experimental methodologies that have been applied, is presented. An important outcome of many of these failure and incident investigations is the development of an improved understanding of not only the state-of-the-art in experimental and analytical methods but also the state-of-the-art in the design and manufacturing processes that may contribute to such failures. In order to provide insight into such large-scale investigations, a series of lessons learned were captured. Awareness of these lessons learned is highly beneficial to engineers involved in similar investigations. Therefore, it is prudent that the lessons learned are disseminated such that they can be built upon in other investigations and in ensuing research and development activities.

  15. [Looking back but facing ahead: implementing lessons learned from the 2nd Lebanon War].

    PubMed

    Adini, Bruria; Laor, Danny; Lev, Boaz; Israeli, Avi

    2010-07-01

    The medical system utilizes a structured culture for learning lessons in order to improve the supply of services. Various tools are utilized to evaluate performance. The aim of the article is to describe the processes for learning lessons which were carried out following the Second Lebanon War and the major lessons that were identified and implemented. Three processes were performed: a process of learning Lessons of the heaLthcare system, initiated and led by the Supreme HeaLth Authority (SHA); After action review (AAR), initiated and led by the military Medical Corps and; at a later stage, a critique, initiated and led by the State Comptroller, that examined the performance of the medical system, as part of a critique on the preparedness of the home front. The following elements were defined as highly prioritized for improvement to elevate the preparedness for a future war: (1) deployment of unified clinics in conflict areas; (2) supply of medical services to the population in shelters; (3) deploying emergency medicine services, including the relationship between the Ministry of Health (MOH) and the Home Front Command (HFC); (4) defining the relationships between the MOH and HFC in deploying the community health services in emergencies; (5) protecting medical facilities and personal protection equipment for medical teams and; (6) treating acute stress reactions. The AAR, critique and learning lessons signify three different processes that can sometimes be contradictory. Nevertheless, it is possible to achieve organizational improvement white integrating between these three processes, as was displayed by the SHA.

  16. Change in Chaos: Seven Lessons Learned from Katrina

    ERIC Educational Resources Information Center

    Carr-Chellman, Alison A.; Beabout, Brian; Alkandari, Khaled A.; Almeida, Luis C.; Gursoy, Husra T.; Ma, Ziyan; Modak, Rucha S.; Pastore, Raymond S.

    2008-01-01

    This article discusses seven lessons learned from Katrina, suggesting that after chaos: (1) there is hope; (2) there is a strong atmosphere of indeterminacy; (3) things tend to break apart and reform in somewhat similar ways but with different values; (4) there is a desire for organization, leadership, and familiarity; (5) there is a sense of…

  17. Circulating Laptops: Lessons Learned in an Academic Library

    ERIC Educational Resources Information Center

    Sharpe, Paul A.

    2009-01-01

    Laptops have become ubiquitous in academic libraries, as has the practice of circulating laptops for student use. Several studies have analyzed the how-to of loaning laptops, and a number of surveys have focused on how they are being used. However, little has been written of the practical lessons learned; the trial and error of those on the…

  18. Report from the School of Experience: Lessons-Learned on NASA's EOS/ICESat Mission

    NASA Technical Reports Server (NTRS)

    Anselm, William

    2003-01-01

    Abstract-NASA s Earth Observing System EOS) Ice, Cloud, and Land Elevation Satellite (ICESat) mission was one of the first missions under Goddard Space Flight Center s (then-) new Rapid Spacecraft Development Office. This paper explores the lessons-learned under the ICESat successful implementation and launch, focusing on four areas: Procurement., Management, Technical, and Launch and Early Operations. Each of these areas is explored in a practical perspective of communication, the viewpoint of the players, and the interactions among the organizations. Conclusions and lessons-learned are summarized in the final section.

  19. Lessons Learned and Flight Results from the F15 Intelligent Flight Control System Project

    NASA Technical Reports Server (NTRS)

    Bosworth, John

    2006-01-01

    A viewgraph presentation on the lessons learned and flight results from the F15 Intelligent Flight Control System (IFCS) project is shown. The topics include: 1) F-15 IFCS Project Goals; 2) Motivation; 3) IFCS Approach; 4) NASA F-15 #837 Aircraft Description; 5) Flight Envelope; 6) Limited Authority System; 7) NN Floating Limiter; 8) Flight Experiment; 9) Adaptation Goals; 10) Handling Qualities Performance Metric; 11) Project Phases; 12) Indirect Adaptive Control Architecture; 13) Indirect Adaptive Experience and Lessons Learned; 14) Gen II Direct Adaptive Control Architecture; 15) Current Status; 16) Effect of Canard Multiplier; 17) Simulated Canard Failure Stab Open Loop; 18) Canard Multiplier Effect Closed Loop Freq. Resp.; 19) Simulated Canard Failure Stab Open Loop with Adaptation; 20) Canard Multiplier Effect Closed Loop with Adaptation; 21) Gen 2 NN Wts from Simulation; 22) Direct Adaptive Experience and Lessons Learned; and 23) Conclusions

  20. Unintended Learning in Primary School Practical Science Lessons from Polanyi's Perspective of Intellectual Passion

    ERIC Educational Resources Information Center

    Park, Jisun; Song, Jinwoong; Abrahams, Ian

    2016-01-01

    This study explored, from the perspective of intellectual passion developed by Michael Polanyi, the unintended learning that occurred in primary practical science lessons. We use the term "unintended" learning to distinguish it from "intended" learning that appears in teachers' learning objectives. Data were collected using…

  1. Involving users with learning difficulties in health improvement: lessons from inclusive learning disability research.

    PubMed

    Walmsley, Jan

    2004-03-01

    In this paper the author considers the lessons to be drawn from what is termed "inclusive" learning disability research for user involvement around health improvement. Inclusive learning disability research refers to research where people with learning difficulties (intellectual disability) are involved as active participants, as opposed to passive subjects. There is by now a considerable body of such research, developed over the past 25 years. From the review, the author draws attention to areas which can inform practice in involvement of users in a way that adds value.

  2. CYGNSS: Lessons We are Learning from a Class D Mission

    NASA Technical Reports Server (NTRS)

    Tumlinson, Jessica

    2015-01-01

    CYGNSS: Lessons Learned from NASA Class D Mission and how they selected their parts for the program to include balance between cost, risk, schedule and technology available as well as balancing cost restraints with mission risk profile.

  3. Best Practices and Lessons Learned In LANL Approaches to Transportation Security

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Drypolcher, Katherine Carr

    Presentation includes slides on Physical Protection of Material in Transit; Graded Approach for Implementation Controls; Security Requirements; LANL Lessons Learned; Shipping Violation; Unmonitored Shipment; Foreign shipment; and the Conclusion.

  4. Responding To School Walkout Demonstrations. Lessons Learned From School Crises and Emergencies, Volume 3, Issue 1, 2008

    ERIC Educational Resources Information Center

    US Department of Education, 2008

    2008-01-01

    "Lessons Learned" is a series of publications that are a brief recounting of actual school emergencies and crises. This "Lessons Learned" issue examines the incidence of student walkout demonstrations and the various ways in which administrators, school staff, law enforcement, and the community at large can help keep youths…

  5. Stereotype Threat Effects on Learning From a Cognitively Demanding Mathematics Lesson.

    PubMed

    Lyons, Emily McLaughlin; Simms, Nina; Begolli, Kreshnik N; Richland, Lindsey E

    2018-03-01

    Stereotype threat-a situational context in which individuals are concerned about confirming a negative stereotype-is often shown to impact test performance, with one hypothesized mechanism being that cognitive resources are temporarily co-opted by intrusive thoughts and worries, leading individuals to underperform despite high content knowledge and ability (see Schmader & Beilock, ). We test here whether stereotype threat may also impact initial student learning and knowledge formation when experienced prior to instruction. Predominantly African American fifth-grade students provided either their race or the date before a videotaped, conceptually demanding mathematics lesson. Students who gave their race retained less learning over time, enjoyed the lesson less, reported a diminished desire to learn more, and were less likely to choose to engage in an optional math activity. The detrimental impact was greatest among students with high baseline cognitive resources. While stereotype threat has been well documented to harm test performance, the finding that effects extend to initial learning suggests that stereotype threat's contribution to achievement gaps may be greatly underestimated. Copyright © 2017 Cognitive Science Society, Inc.

  6. Safety and Mission Assurance for In-House Design Lessons Learned from Ares I Upper Stage

    NASA Technical Reports Server (NTRS)

    Anderson, Joel M.

    2011-01-01

    This viewgraph presentation identifies lessons learned in the course of the Ares I Upper Stage design and in-house development effort. The contents include: 1) Constellation Organization; 2) Upper Stage Organization; 3) Presentation Structure; 4) Lesson-Importance of Systems Engineering/Integration; 5) Lesson-Importance of Early S&MA Involvement; 6) Lesson-Importance of Appropriate Staffing Levels; 7) Lesson-Importance S&MA Team Deployment; 8) Lesson-Understanding of S&MA In-Line Engineering versus Assurance; 9) Lesson-Importance of Close Coordination between Supportability and Reliability/Maintainability; 10) Lesson-Importance of Engineering Data Systems; 11) Lesson-Importance of Early Development of Supporting Databases; 12) Lesson-Importance of Coordination with Safety Assessment/Review Panels; 13) Lesson-Implementation of Software Reliability; 14) Lesson-Implementation of S&MA Technical Authority/Chief S&MA Officer; 15) Lesson-Importance of S&MA Evaluation of Project Risks; 16) Lesson-Implementation of Critical Items List and Government Mandatory Inspections; 17) Lesson-Implementation of Critical Items List Mandatory Inspections; 18) Lesson-Implementation of Test Article Safety Analysis; and 19) Lesson-Importance of Procurement Quality.

  7. Conduction Abnormalities and Pacemaker Implantations After SAPIEN 3 Vs SAPIEN XT Prosthesis Aortic Valve Implantation.

    PubMed

    Husser, Oliver; Kessler, Thorsten; Burgdorf, Christof; Templin, Christian; Pellegrini, Costanza; Schneider, Simon; Kasel, Albert Markus; Kastrati, Adnan; Schunkert, Heribert; Hengstenberg, Christian

    2016-02-01

    Transcatheter aortic valve implantation is increasingly used in patients with aortic stenosis. Post-procedural intraventricular conduction abnormalities and permanent pacemaker implantations remain a serious concern. Recently, the Edwards SAPIEN 3 prosthesis has replaced the SAPIEN XT. We sought to determine the incidences of new-onset intraventricular conduction abnormalities and permanent pacemaker implantations by comparing the 2 devices. We analyzed the last consecutive 103 patients undergoing transcatheter aortic valve implantation with SAPIEN XT before SAPIEN 3 was used in the next 105 patients. To analyze permanent pacemaker implantations and new-onset intraventricular conduction abnormalities, patients with these conditions at baseline were excluded. Electrocardiograms were recorded at baseline, after the procedure, and before discharge. SAPIEN 3 was associated with higher device success (100% vs 92%; P=.005) and less paravalvular leakage (0% vs 7%; P<.001). The incidence of permanent pacemaker implantations was 12.6% (23 of 183) with no difference between the 2 groups (SAPIEN 3: 12.5% [12 of 96] vs SAPIEN XT: 12.6% [11 of 87]; P=.99). SAPIEN 3 was associated with a higher rate of new-onset intraventricular conduction abnormalities (49% vs 27%; P=.007) due to a higher rate of fascicular blocks (17% vs 5%; P=.021). There was no statistically significant difference in transient (29% [20 of 69] vs persistent 19% [12 of 64]; P=.168) left bundle branch blocks (28% [19 of 69] vs 17% [11 of 64]; P=.154) when SAPIEN 3 was compared with SAPIEN XT. We found a trend toward a higher rate of new-onset intraventricular conduction abnormalities with SAPIEN 3 compared with SAPIEN XT, although this did not result in a higher permanent pacemaker implantation rate. Copyright © 2015 Sociedad Española de Cardiología. Published by Elsevier España, S.L.U. All rights reserved.

  8. Job Oriented Training ’Lessons Learned

    DTIC Science & Technology

    2008-11-01

    Job Oriented Training ’Lessons Learned’ Job Oriented Training (JOT), een vorm van trainen waarbij de cursist zelfstandig, zonder theorie vooraf...39 77 lnfo-DenV@tno.nl TNO-rapportnummer TNO-DV 2008 A447 Opdrachtnummer Datum november 2008 Auteur (s) drs. H.E. Stubbe dr. A.H. van der...onderlinge discussie over achterliggende overwegingen te stimuleren. Zij hebben op dat moment nog geen theorie aangeboden gekregen en zijn niet op de hoogte

  9. PUREX/UO3 Facilities deactivation lessons learned history

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gerber, M.S.

    1996-09-19

    and were accompanied by and were an integral part of sweeping ``culture changes,`` the story of the lessons learned during the PUREX Deactivation Project are worth recounting. Foremost among the lessons is recognizing the benefits of ``right to left`` project planning. A deactivation project must start by identifying its end points, then make every task, budget, and organizational decision based on reaching those end points. Along with this key lesson is the knowledge that project planning and scheduling should be tied directly to costing, and the project status should be checked often (more often than needed to meet mandated reporting requirements) to reflect real-time work. People working on a successful project should never be guessing about its schedule or living with a paper schedule that does not represent the actual state of work. Other salient lessons were learned in the PUREX/UO3 Deactivation Project that support these guiding principles. They include recognizing the value of independent review, teamwork, and reengineering concepts; the need and value of cooperation between the DOE, its contractors, regulators, and stakeholders; and the essential nature of early and ongoing communication. Managing a successful project also requires being willing to take a fresh look at safety requirements and to apply them in a streamlined and sensible manner to deactivating facilities; draw on the enormous value of resident knowledge acquired by people over years and sometimes decades of working in old plants; and recognize the value of bringing in outside expertise for certain specialized tasks.This approach makes possible discovering the savings that can come when many creative options are pursued persistently and the wisdom of leaving some decisions to the future. The essential job of a deactivation project is to place a facility in a safe, stable, low-maintenance mode, for an interim period. Specific end points are identified to recognize and document this state. Keeping

  10. Active Learning Institute: Energizing Science and Math Education. A Compilation of Lesson Plans.

    ERIC Educational Resources Information Center

    Cuyahoga Community Coll. - East, Cleveland, OH.

    The middle school and high school lessons featured in this collection were crafted by science and math teachers who participated in a week-long seminar sponsored by the Eisenhower Professional Development Program administered by the Ohio Board of Regents. The lessons showcase a variety of active learning strategies from using hands-on, low-tech…

  11. The role of failure/problems in engineering: A commentary of failures experienced - lessons learned

    NASA Technical Reports Server (NTRS)

    Ryan, R. S.

    1992-01-01

    The written version of a series of seminars given to several aerospace companies and three NASA centers are presented. The results are lessons learned through a study of the problems experienced in 35 years of engineering. The basic conclusion is that the primary cause of problems has not been mission technologies, as important as technology is, but the neglect of basic principles. Undergirding this is the lack of a systems focus from determining requirements through design, verification, and operations phases. Many of the concepts discussed are fundamental to total quality management (TQM) and can be used to augment this product enhanced philosophy. Fourteen principles are addressed with problems experienced and are used as examples. Included is a discussion of the implication of constraints, poorly defined requirements, and schedules. Design guidelines, lessons learned, and future tasks are listed. Two additional sections are included that deal with personal lessons learned and thoughts on future thrusts (TQM).

  12. Implementation of the Generic Safety Analysis Report - Lessons Learned

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Blanchard, A.

    1999-06-02

    The Savannah River Site has completed the development, review and approval process for the Generic Safety Analysis Report (GSAR) and implemented this information in facility SARs and BIOs. This includes the yearly revision of the GSAR and the facility-specific SARs. The process has provided us with several lessons learned.

  13. Achieving Balance: Lessons Learned from University and College Presidents

    ERIC Educational Resources Information Center

    Havice, Pamela A.; Williams, Frankie K.

    2005-01-01

    This study investigated strategies used by college and university presidents in balancing their professional and personal lives. The conceptual framework for this study comes from the work of Schein (1985, 1992). Lessons learned and words of wisdom from these presidents can enhance leadership effectiveness at all levels in higher education.

  14. University Hospital Struck Deaf and Silent by Lightning: Lessons to Learn.

    PubMed

    Dami, Fabrice; Carron, Pierre-Nicolas; Yersin, Bertrand; Hugli, Olivier

    2015-08-01

    We describe how an electromagnetic wave after a lightning strike affected a university hospital, including the communication shutdown that followed, the way it was handled, and the lessons learned from this incident.

  15. Assessment and Program Accountability in Early Childhood Education: Lessons Learned in Ohio

    ERIC Educational Resources Information Center

    Boat, Mary; Zorn, Debbie; Austin, James T.

    2005-01-01

    Ensuring that children, especially those from disadvantaged backgrounds, start school ready to learn is an important goal. This paper presents lessons learned from the state of Ohio's multi-year program to develop a standards-based assessment system for programs delivering state-funded early childhood education (ECE) through programs receiving…

  16. Academic-Community Partnership for Medical Missions: Lessons Learned and Practical Guidance for Global Health Service-Learning Experiences.

    PubMed

    Dang, Yen H; Nice, Frank J; Truong, Hoai-An

    2017-01-01

    To facilitate an academic-community partnership for sustainable medical mis-sions, a 12-step process was created for an interprofessional, global health educational, and service-learning experience for students and faculty in a school of pharmacy and health professions. Lessons learned and practical guidance are provided to implement similar global health opportunities.

  17. Perceived Advantages of 3D Lessons in Constructive Learning for South African Student Teachers Encountering Learning Barriers

    ERIC Educational Resources Information Center

    de Jager, Thelma

    2017-01-01

    Research shows that three-dimensional (3D)-animated lessons can contribute to student teachers' effective learning and comprehension, regardless of the learning barriers they experience. Student teachers majoring in the subject Life Sciences in General Subject Didactics viewed 3D images of the heart during lectures. The 3D images employed in the…

  18. Learning to Learn: Lessons from a Collaboration

    ERIC Educational Resources Information Center

    Chadha, Anita

    2017-01-01

    E-learning has become one of the primary ways to deliver education around the globe. Research is keeping pace with the use of various techno-aids as educators evaluate how to effectively use these aids in an ever-changing e-classroom. Adding to this body of work, and in assessing the effectiveness of techno-tools, this study evaluates meaningful…

  19. SABER on Orbit Performance Evaluation and Lessons Learned

    NASA Astrophysics Data System (ADS)

    Jensen, Scott M.; Batty, J. Clair

    2004-06-01

    The Sounding of the Atmosphere using Broadband Emission Radiometry (SABER) instrument, launched into orbit December 7, 2001, utilized a miniature pulse-tube cryocooler to maintain the SABER focal plane assembly (FPA) at 75 K. The limited cooling capacity of the cryocooler necessitated the development of a new never before flown Fiber Support Technology (FiST) for supporting and thermally isolating the FPA. A very precise predictive thermal modeling effort to ensure successful operation was also needed due to the very small capacity margin of the cryocooler. A high performance thermal link that minimized the temperature difference between the FPA and the cryocooler cold block and also the mechanical dynamic loading on the fragile pulse tube was developed and space qualified. This paper presents a comparison of the thermal modeling predictions with on orbit measurements, and discusses the lessons learned concerning long term performance issues of thermal isolation systems which utilize cryocoolers for cooling focal plane assemblies (FPA's). The effect of ice deposition on the thermal blankets and other FPA cooled structures, as well as the lessons learned in dealing with this ice deposition, will also be presented.

  20. Lessons offered, lessons learned: reflections on how doing family therapy can affect therapists.

    PubMed

    Heatherington, Laurie; Friedlander, Myrna L; Diamond, Gary M

    2014-08-01

    Only in working conjointly with couples and families do therapists literally witness clients struggling to improve their most intimate relationships. In writing this article, we realized that, in true systemic fashion, not only have many of our clients benefited from working with us, but also we have learned some invaluable lessons from them. Indeed, practicing couple and family therapy gives therapists many opportunities to learn about themselves, especially when it is done thoughtfully. In this article, we reflect on myriad ways in which couples and family therapy has affected each of us personally-as individuals, as partners, as parents, as adult children in our families of origin, and as educators. © 2014 Wiley Periodicals, Inc.

  1. The Virginia Generalist Initiative: Lessons Learned in a Statewide Consortium.

    ERIC Educational Resources Information Center

    Morse, R. Michael; Plungas, Gay S.; Duke, Debra; Rollins, Lisa K.; Barnes, H. Verdain; Brinson, Betsy K.; Martindale, James R.; Marsland, David W.

    1999-01-01

    To increase supply of generalist physicians, three state-supported Virginia medical schools formed a partnership with governmental stakeholders in the Generalist Physician Initiative. Lessons learned concerning stakeholder participation in planning, shared philosophical commitment, support for risk-taking, attitudes toward change, and trust are…

  2. Flight Planning Branch Space Shuttle Lessons Learned

    NASA Technical Reports Server (NTRS)

    Price, Jennifer B.; Scott, Tracy A.; Hyde, Crystal M.

    2011-01-01

    Planning products and procedures that allow the mission flight control teams and the astronaut crews to plan, train and fly every Space Shuttle mission have been developed by the Flight Planning Branch at the NASA Johnson Space Center. As the Space Shuttle Program ends, lessons learned have been collected from each phase of the successful execution of these Shuttle missions. Specific examples of how roles and responsibilities of console positions that develop the crew and vehicle attitude timelines will be discussed, as well as techniques and methods used to solve complex spacecraft and instrument orientation problems. Additionally, the relationships and procedural hurdles experienced through international collaboration have molded operations. These facets will be explored and related to current and future operations with the International Space Station and future vehicles. Along with these important aspects, the evolution of technology and continual improvement of data transfer tools between the shuttle and ground team has also defined specific lessons used in the improving the control teams effectiveness. Methodologies to communicate and transmit messages, images, and files from Mission Control to the Orbiter evolved over several years. These lessons have been vital in shaping the effectiveness of safe and successful mission planning that have been applied to current mission planning work in addition to being incorporated into future space flight planning. The critical lessons from all aspects of previous plan, train, and fly phases of shuttle flight missions are not only documented in this paper, but are also discussed as how they pertain to changes in process and consideration for future space flight planning.

  3. Eco-Schools Scotland: Lessons Learned from First-Hand Experience

    ERIC Educational Resources Information Center

    Fraser, Neil

    2010-01-01

    Secondary schools are tasked with becoming sustainable institutions but this can be difficult to achieve because of a lack of time, shortage of project ideas and limited environmental management expertise. The Eco-Schools initiative exists to overcome these issues, and lessons learned from some schools in Scotland can help other schools implement…

  4. Landscape-scale carbon sampling strategy-lessons learned. Chapter 17

    Treesearch

    John B. Bradford; Peter Weishampel; Marie-Louise Smith; Randall Kolka; David Y. Hollinger; Richard A. Birdsey; Scott Ollinger; Michael Ryan

    2008-01-01

    Previous chapters examined individual processes relevant to forest carbon cycling, and characterized measurement approaches for understanding those processes at landscape scales. In this final chapter, we address our overall approach to understanding forest carbon dynamics over large areas. Our objective is to identify any lessons that we learned in the course of...

  5. LESSONS LEARNED Biosurveillance Mobile App Development Intern Competition (Summer 2013)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Noonan, Christine F.; Henry, Michael J.; Corley, Courtney D.

    2014-01-14

    The purpose of the lessons learned document for the BEOWulf Biosurveillance Mobile App Development Intern Competition is to capture the project’s lessons learned in a formal document for use by other project managers on similar future projects. This document may be used as part of new project planning for similar projects in order to determine what problems occurred and how those problems were handled and may be avoided in the future. Additionally, this document details what went well with the project and why, so that other project managers may capitalize on these actions. Project managers may also use this documentmore » to determine who the project team members were in order to solicit feedback for planning their projects in the future. This document will be formally communicated with the organization and will become a part of the organizational assets and archives.« less

  6. Measurements of particle backscatter, extinction, and lidar ratio at 1064 nm with the rotational raman method in Polly-XT

    NASA Astrophysics Data System (ADS)

    Engelmann, Ronny; Haarig, Moritz; Baars, Holger; Ansmann, Albert; Kottas, Michael; Marinou, Eleni

    2018-04-01

    We replaced a 1064-nm interference filter of a Polly-XT lidar system by a 1058-nm filter to observe pure rotational Raman backscattering from atmospheric Nitrogen and Oxygen. Polly-XT is compact Raman lidar with a Nd:YAG laser (20 Hz, 200 mJ at 1064 nm) and a 30-cm telescope mirror which applies photomultipliers in photoncounting mode. We present the first measured signals at 1058 nm and the derived extinction profile from measurements aboard RV Polarstern and in Leipzig. In combination with another Polly-XT system we could also derive particle backscatter and lidar ratio profiles at 1064 nm.

  7. Teaching Inquiry using NASA Earth-System Science: Lessons Learned for Blended, Scaffolded Professional Development

    NASA Astrophysics Data System (ADS)

    Ellis, T. D.; TeBockhorst, D.

    2013-12-01

    Teaching Inquiry using NASA Earth-System Science (TINES) is a NASA EPOESS funded program exploring blended professional development for pre- and in-service educators to learn how to conduct meaningful inquiry lessons and projects in the K-12 classroom. This project combines trainings in GLOBE observational protocols and training in the use of NASA Earth Science mission data in a backward-faded scaffolding approach to teaching and learning about scientific inquiry. It also features a unique partnership with the National Science Teachers Association Learning Center to promote cohort building and blended professional development with access to NSTA's collection of resources. In this presentation, we will discuss lessons learned in year one and two of this program and how we plan to further develop this program over the next two years.

  8. Designing Academic Audit: Lessons Learned in Europe and Asia.

    ERIC Educational Resources Information Center

    Dill, David D.

    2000-01-01

    Reviews lessons learned from early experiments with academic audits in the United Kingdom, Sweden, New Zealand, and Hong Kong in areas such as: focus of audits, selection and training of audit teams, nature of audit self-studies, conduct of audit visits, audit reports, and audit follow-up and enhancement activities. Suggests guidelines for design…

  9. Psychiatric lessons learned in Kandahar

    PubMed Central

    Jetly, Rakesh

    2011-01-01

    Not since the Korean War have the Canadian Forces engaged in combat missions like those in Afghanistan. Combat, asymmetric warfare, violent insurgency and the constant threat of improvised explosive devices all contribute to the psychological stressors experienced by Canadian soldiers. Mental health teams deployed with the soldiers and provided assessment, treatment and education. Lessons learned included refuting the myth that all psychological disorders would be related to trauma; confirming that most patients do well after exposure to trauma; confirming that treating disorders in a war zone requires flexible and creative adaptation of civilian treatment guidelines; and confirming that in a combat mission mental health practice is not limited to the clinical setting. PMID:22099328

  10. Psychiatric lessons learned in Kandahar.

    PubMed

    Jetly, Rakesh

    2011-12-01

    Not since the Korean War have the Canadian Forces engaged in combat missions like those in Afghanistan. Combat, asymmetric warfare, violent insurgency and the constant threat of improvised explosive devices all contribute to the psychological stressors experienced by Canadian soldiers. Mental health teams deployed with the soldiers and provided assessment, treatment and education. Lessons learned included refuting the myth that all psychological disorders would be related to trauma; confirming that most patients do well after exposure to trauma; confirming that treating disorders in a war zone requires flexible and creative adaptation of civilian treatment guidelines; and confirming that in a combat mission mental health practice is not limited to the clinical setting.

  11. Implementing large-scale food fortification in Ghana: lessons learned.

    PubMed

    Nyumuah, Richard Odum; Hoang, Thuy-Co Caroline; Amoaful, Esi Foriwa; Agble, Rosanna; Meyer, Marc; Wirth, James P; Locatelli-Rossi, Lorenzo; Panagides, Dora

    2012-12-01

    Food fortification began in Ghana in 1996 when legislation was passed to enforce the iodization of salt. This paper describes the development of the Ghanaian fortification program and identifies lessons learned in implementing fortification initiatives (universal salt iodization, fortification of vegetable oil and wheat flour) from 1996 to date. This paper identifies achievements, challenges, and lessons learned in implementing large scale food fortification in Ghana. Primary data was collected through interviews with key members of the National Food Fortification Alliance (NFFA), implementation staff of the Food Fortification Project, and staff of GAIN. Secondary data was collected through desk review of documentation from the project offices of the National Food Fortification Project and the National Secretariat for the Implementation of the National Salt Iodization in Ghana. Reduction of the prevalence of goiter has been observed, and coverage of households with adequately iodized salt increased between 1996 and 2006. Two models were designed to increase production of adequately iodized salt: one to procure and distribute potassium iodate (KIO3) locally, and the second, the salt bank cooperative (SBC) model, specifically designed for small-scale artisanal salt farmers. This resulted in the establishment of a centralized potassium iodate procurement and distribution system, tailored to local needs and ensuring competitive and stable prices. The SBC model allowed for nearly 157 MT of adequately iodized salt to be produced in 2011 in a region where adequately iodized salt was initially not available. For vegetable oil fortification, implementing quantitative analysis methods for accurate control of added fortificant proved challenging but was overcome with the use of a rapid test device, confirming that 95% of vegetable oil is adequately fortified in Ghana. However, appropriate compliance with national standards on wheat flour continues to pose challenges due to

  12. Lessons learned after three years of legalized, recreational marijuana: The Colorado experience.

    PubMed

    Ghosh, Tista S; Vigil, Daniel I; Maffey, Ali; Tolliver, Rickey; Van Dyke, Mike; Kattari, Leonardo; Krug, Heather; Reed, Jack K; Wolk, Larry

    2017-11-01

    In November 2012 Colorado voters approved legalized recreational marijuana. On January 1, 2014 Colorado became the first state to allow legal sales of non-medical marijuana for adults over the age of 21. Since that time, the state has been monitoring potential impacts on population health. In this paper we present lessons learned in the first three years following legal sales of recreational marijuana. These lessons pertain to health behaviors and health outcomes, as well as to health policy issues. Our intent is to share these lessons with other states as they face the prospect of recreational marijuana legalization. Copyright © 2017 Elsevier Inc. All rights reserved.

  13. Contamination and UV lasers: lessons learned

    NASA Astrophysics Data System (ADS)

    Daly, John G.

    2015-09-01

    Laser induced damage to optical elements has been a subject of significant research, development, and improvement, since the first lasers were built over the last 50 years. Better materials, with less absorption, impurities, and defects are available, as well as surface coatings with higher laser damage resistance. However, the presence of contamination (particles, surface deposition films, or airborne) can reduce the threshold for damage by several orders of magnitude. A brief review of the anticipated laser energy levels for damage free operation is presented as a lead into the problems associated with contamination for ultraviolet (UV) laser systems. As UV lasers become more common in applications especially in areas such as lithography, these problems have limited reliability and added to costs. This has been characterized as Airborne Molecular Contamination (AMC) in many published reports. Normal engineering guidelines such as screening materials within the optical compartment for low outgassing levels is the first step. The use of the NASA outgassing database (or similar test methods) with low Total Mass Loss (TML) and Condensed Collected Volatiles Collected Mass (CVCM) is a good baseline. Energetic UV photons are capable of chemical bond scission and interaction with surface contaminant or airborne materials results in deposition of obscuring film laser footprints that continue to degrade laser system performance. Laser systems with average powers less than 5 mW have been shown to exhibit aggressive degradation. Lessons learned over the past 15 years with UV laser contamination and steps to reduce risk will be presented.

  14. Five Important Lessons I Learned during the Process of Creating New Child Care Centers

    ERIC Educational Resources Information Center

    Whitehead, R. Ann

    2005-01-01

    In this article, the author describes her experiences of developing new child care sites and offers five important lessons that she learned through her experiences which helped her to create successful child care centers. These lessons include: (1) Finding an appropriate area and location; (2) Creating realistic financial projections based on real…

  15. Lessons learned from starting Rochester Precision Optics

    NASA Astrophysics Data System (ADS)

    Hurley, William P.

    2014-12-01

    Thank you very much for coming to attend this talk. I see a few familiar faces in the crowd that have had their own journeys, and if you're thinking of starting your own optics business, this is not the authoritative talk on how to do. It's just a talk on what I've learned from my journey and some of my own stories on Lessons Learned. It does tie into some of the previous talks, and I do give credit to some mentors. The developments I've been involved with do make use of the ability to adapt and change, and there have been Bumps in the Road here and there, and I'll tell you a little bit more about that during this Talk.

  16. Providing Simulated Online and Mobile Learning Experiences in a Prison Education Setting: Lessons Learned from the PLEIADES Pilot Project

    ERIC Educational Resources Information Center

    Farley, Helen; Murphy, Angela; Bedford, Tasman

    2014-01-01

    This article reports on the preliminary findings, design criteria and lessons learned while developing and piloting an alternative to traditional print-based education delivery within a prison environment. PLEIADES (Portable Learning Environments for Incarcerated Distance Education Students), was designed to provide incarcerated students with…

  17. Lessons Learned from Autonomous Sciencecraft Experiment

    NASA Technical Reports Server (NTRS)

    Chien, Steve A.; Sherwood, Rob; Tran, Daniel; Cichy, Benjamin; Rabideau, Gregg; Castano, Rebecca; Davies, Ashley; Mandl, Dan; Frye, Stuart; Trout, Bruce; hide

    2005-01-01

    An Autonomous Science Agent has been flying onboard the Earth Observing One Spacecraft since 2003. This software enables the spacecraft to autonomously detect and responds to science events occurring on the Earth such as volcanoes, flooding, and snow melt. The package includes AI-based software systems that perform science data analysis, deliberative planning, and run-time robust execution. This software is in routine use to fly the EO-l mission. In this paper we briefly review the agent architecture and discuss lessons learned from this multi-year flight effort pertinent to deployment of software agents to critical applications.

  18. Selected Distance Education Disaster Planning Lessons Learned from Hurricane Katrina

    ERIC Educational Resources Information Center

    McLennan, Kay L.

    2006-01-01

    This paper details one institution's experience developing post disaster online instructional capability without access to the institution's courseware platform and help desk services. In turn, the post disaster distance education lessons learned include the possible need for all institutions to: prearrange an interruption of service agreement…

  19. Writing Learning Outcomes for English Language Lessons in Multilingual Schools

    ERIC Educational Resources Information Center

    Jones, Sally Ann

    2016-01-01

    This article proposes a pedagogic innovation in teacher education by articulating a method for writing learning outcomes for English language lessons in multilingual school contexts. The argument for this approach is founded on curriculum studies; however, the practice also draws specifically on applied psycholinguistic and sociolinguistic…

  20. My Time as a Professor in Residence: Lessons Learned

    ERIC Educational Resources Information Center

    Marsh, Josephine Peyton

    2013-01-01

    This commentary is based on two of the lessons the author learned as the professor in residence at ASU Preparatory Academy-Phoenix (ASU Prep), a Title I school operated in partnership with the Phoenix Elementary School District. Her role as a university professor on special assignment as a literacy coach, staff developer, and co-researcher. The…

  1. Implementation of problem-based learning in geometry lessons

    NASA Astrophysics Data System (ADS)

    Ahamad, S. N. S. H.; Li, H.-C.; Shahrill, M.; Prahmana, R. C. I.

    2017-12-01

    The aim of this study is twofold. Firstly, it aims to examine the effects of the Problem-Based Learning (PBL) approach on students’ performance in the learning of geometry. Secondly, it seeks to gain insights from the students regarding the implementation of PBL in geometry lessons. The participants were 22 students from one Year 10 class in a co-educational secondary school in Brunei Darussalam. A mixed method design was employed with data collected from the pre-, post- and retention tests, and interviews. The findings from this study revealed positive influences on students’ performance in learning geometry as gain and retention of knowledge was observed. Meanwhile, mixed responses from the interviews implied that in terms of 1) learning attitudes, students favoured the idea of independent learning but some critiqued that the process of PBL might be time-consuming; 2) learning difficulties, some students struggled in assimilating information leading to poor decision- making; and 3) knowledge and skills, some students believed to have nurtured some skills such as communication and research skills.

  2. Applying lessons learned in communities to programs and policies at the federal level.

    PubMed

    Chang, Debbie I

    2006-01-01

    As solutions to the problems of the uninsured are debated, there are lessons to be learned from community-based initiatives. Such efforts can provide information on different models as well as key political lessons. Defining the specific role that community efforts play is also critical. Actively involving community stakeholders of such community initiatives in health care policy debates will result in more workable policies.

  3. Shaping Interpersonal Learning in the Jazz Improvisation Lesson: Observing a Dynamic Systems Approach

    ERIC Educational Resources Information Center

    de Bruin, Leon Rene

    2018-01-01

    Music institutions predominantly utilize the one-to-one lesson in developing and supporting music students' learning of skill and knowledge. This article explores the effect that interpersonal interaction plays in shaping pedagogical applications between teacher and student. Observing the learning of improvisation within this individualized social…

  4. Novice Teachers' Perspectives on Learning in Lesson Rehearsals in Second Language Teacher Preparation

    ERIC Educational Resources Information Center

    Troyan, Francis John; Peercy, Megan Madigan

    2016-01-01

    Although scholars working in core practices have put forth lesson rehearsals as central to novice teachers' learning and development, there is little work on how novice teachers experience rehearsals. This qualitative research investigated learning opportunities for novice teachers of language learners during rehearsals. The analysis examines two…

  5. Supporting Shared Resource Usage for a Diverse User Community: the OSG Experience and Lessons Learned

    NASA Astrophysics Data System (ADS)

    Garzoglio, Gabriele; Levshina, Tanya; Rynge, Mats; Sehgal, Chander; Slyz, Marko

    2012-12-01

    The Open Science Grid (OSG) supports a diverse community of new and existing users in adopting and making effective use of the Distributed High Throughput Computing (DHTC) model. The LHC user community has deep local support within the experiments. For other smaller communities and individual users the OSG provides consulting and technical services through the User Support area. We describe these sometimes successful and sometimes not so successful experiences and analyze lessons learned that are helping us improve our services. The services offered include forums to enable shared learning and mutual support, tutorials and documentation for new technology, and troubleshooting of problematic or systemic failure modes. For new communities and users, we bootstrap their use of the distributed high throughput computing technologies and resources available on the OSG by following a phased approach. We first adapt the application and run a small production campaign on a subset of “friendly” sites. Only then do we move the user to run full production campaigns across the many remote sites on the OSG, adding to the community resources up to hundreds of thousands of CPU hours per day. This scaling up generates new challenges - like no determinism in the time to job completion, and diverse errors due to the heterogeneity of the configurations and environments - so some attention is needed to get good results. We cover recent experiences with image simulation for the Large Synoptic Survey Telescope (LSST), small-file large volume data movement for the Dark Energy Survey (DES), civil engineering simulation with the Network for Earthquake Engineering Simulation (NEES), and accelerator modeling with the Electron Ion Collider group at BNL. We will categorize and analyze the use cases and describe how our processes are evolving based on lessons learned.

  6. Science Highlights and Lessons Learned from the Atmospheric Infrared Sounder (AIRS)

    NASA Technical Reports Server (NTRS)

    Pagano, Thomas S.; Fetzer, Eric J.; Suda, Jarrod; Licata, Steve

    2011-01-01

    The Atmospheric Infrared Sounder (AIRS) and companion instrument, the Advanced Microwave Sounding Unit (AMSU) on the NASA Earth Observing System Aqua spacecraft are facility instruments designed to support measurements of atmospheric temperature, water vapor and a wide range of atmospheric constituents in support of weather forecasting and scientific research in climate and atmospheric chemistry. This paper is an update to the science highlights from a paper by the authors released last year and also looks back at the lessons learned and future needs of the scientific community. These lessons not only include requirements on the measurements, but scientific shortfalls as well. Results from the NASA Science Community Workshop in IR and MW Sounders relating to AIRS and AMSU requirements and concerns are covered and reflect much of what has been learned and what is needed for future atmospheric sounding from Low Earth Orbit.

  7. Learning with and about Advertising in Chemistry Education with a Lesson Plan on Natural Cosmetics--A Case Study

    ERIC Educational Resources Information Center

    Belova, Nadja; Eilks, Ingo

    2015-01-01

    This paper describes a case study on the chemistry behind natural cosmetics in five chemistry learning groups (grades 7-11, age range 13-17) in a German comprehensive school. The lesson plan intends to promote critical media literacy in the chemistry classroom and specifically emphasizes learning with and about advertising. The lessons of four…

  8. Evaluating Primary School Student's Deep Learning Approach to Science Lessons

    ERIC Educational Resources Information Center

    Ilkörücü Göçmençelebi, Sirin; Özkan, Muhlis; Bayram, Nuran

    2012-01-01

    This study examines the variables which help direct students to a deep learning approach to science lessons, with the aim of guiding programmers and teachers in primary education. The sample was composed of a total of 164 primary school students. The Learning Approaches to Science Scale developed by Ünal (2005) for Science and Technology lessons…

  9. What Positive Lessons Have You Learned from English Class about Working with Other People?

    ERIC Educational Resources Information Center

    Cook, Bailey; Keefe, Bailey; Gray, Angela; Li, Justin; Miller, Kevin

    2010-01-01

    This article provides a forum for students to share their experiences and lessons learned from English class about working with other people. The first author thinks it is a good idea to have split-level classes because it opens up new opportunities to meet people and teaches one many good lessons about working with other people. The second author…

  10. The neXtProt peptide uniqueness checker: a tool for the proteomics community.

    PubMed

    Schaeffer, Mathieu; Gateau, Alain; Teixeira, Daniel; Michel, Pierre-André; Zahn-Zabal, Monique; Lane, Lydie

    2017-11-01

    The neXtProt peptide uniqueness checker allows scientists to define which peptides can be used to validate the existence of human proteins, i.e. map uniquely versus multiply to human protein sequences taking into account isobaric substitutions, alternative splicing and single amino acid variants. The pepx program is available at https://github.com/calipho-sib/pepx and can be launched from the command line or through a cgi web interface. Indexing requires a sequence file in FASTA format. The peptide uniqueness checker tool is freely available on the web at https://www.nextprot.org/tools/peptide-uniqueness-checker and from the neXtProt API at https://api.nextprot.org/. lydie.lane@sib.swiss. © The Author(s) 2017. Published by Oxford University Press.

  11. System 80+{trademark} standard design incorporates radiation protection lessons learned

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Crom, T.D.; Naugle, C.L.; Turk, R.S.

    1995-03-01

    Many lessons have been learned from the current generation of nuclear plants in the area of radiation protection. The following paper will outline how the lessons learned have been incorporated into the design and operational philosophy of the System 80+{trademark} Standard Design currently under development by ABB Combustion Engineering (ABB-CE) with support from Duke Engineering and Services, Inc. and Stone and Webster Engineering Corporation in the Balance-of-Plant design. The System 80+{trademark} Standard Design is a complete nuclear power plant for national and international markets, designed in direct response to utility needs for the 1990`s, and scheduled for Nuclear Regulatory Commissionmore » (NRC) Design Certification under the new standardization rule (10 CFR Part 52). System 80+{trademark} is a natural extension of System 80{sup R} technology, an evolutionary change based on proven Nuclear Steam Supply System (NSSS) in operation at Palo Verde in Arizona and under construction at Yonggwang in the Republic of Korea. The System 80+{trademark} Containment and much of the Balance of Plant design is based upon Duke Power Company`s Cherokee Plant, which was partially constructed in the late 1970`s, but, was later canceled (due to rapid declined in electrical load growth). The System 80+{trademark} Standard Design meets the requirements given in the Electric Power Research Institute (EPRI) Advanced Light Water Reactor (ALWR) Requirements Document. One of these requirements is to limit the occupational exposure to 100 person-rem/yr. This paper illustrates how this goal can be achieved through the incorporation of lessons learned, innovative design, and the implementation of a common sense approach to operation and maintenances practices.« less

  12. Ebola: lessons learned and future challenges for Europe.

    PubMed

    Quaglio, GianLuca; Goerens, Charles; Putoto, Giovanni; Rübig, Paul; Lafaye, Pierre; Karapiperis, Theodoros; Dario, Claudio; Delaunois, Paul; Zachariah, Rony

    2016-02-01

    The Ebola virus epidemic has topped media and political agendas for months; several countries in west Africa have faced the worst Ebola epidemic in history. At the beginning of the disease outbreak, European Union (EU) policies were notably absent regarding how to respond to the crisis. Although the epidemic is now receding from public view, this crisis has undoubtedly changed the European public perception of Ebola virus disease, which is no longer regarded as a bizarre entity confined in some unknown corner in Africa. Policy makers and researchers in Europe now have an opportunity to consider the lessons learned. In this Personal View, we discuss the EU's response to the Ebola crisis in west Africa. Unfortunately, although ample resources and opportunities for humanitarian and medical action existed, the EU did not use them to promote a rapid and well coordinated response to the Ebola crisis. Lessons learned from this crisis should be used to improve the role of the EU in similar situations in the future, ensuring that European aid can be effectively deployed to set up an improved emergency response system, and supporting the establishment of sustainable health-care services in west Africa. Copyright © 2016 Elsevier Ltd. All rights reserved.

  13. International Space Station Materials: Selected Lessons Learned

    NASA Technical Reports Server (NTRS)

    Golden, Johnny L.

    2007-01-01

    The International Space Station (ISS) program is of such complexity and scale that there have been numerous issues addressed regarding safety of materials: from design to manufacturing, test, launch, assembly on-orbit, and operations. A selection of lessons learned from the ISS materials perspective will be provided. Topics of discussion are: flammability evaluation of materials with connection to on-orbit operations; toxicity findings for foams; compatibility testing for materials in fluid systems; and contamination control in precision clean systems and critical space vehicle surfaces.

  14. First Spacelab mission status and lessons learned

    NASA Technical Reports Server (NTRS)

    Craft, H. G., Jr.; Smith, M. J.; Mullinger, D.

    1982-01-01

    There are 38 experiments and/or facilities currently under development, or undergoing testing, which will be incorporated into Spacelab for its first mission. These experiments cover a range of scientific disciplines which includes atmospheric research, life sciences, space plasma research, materials science, and space industrialization technology. In addition to the full development of individual experiments, the final design of the integrated payload and the development of all requisite integration hardware have been accomplished. Attention is given to the project management lessons learned during payload integration development.

  15. MINE WASTE TECHNOLOGY PROGRAM: RECENT RESULTS: LESSONS LEARNED AND FUTURE OPPORTUNITIES

    EPA Science Inventory

    In the EPA sponsored AML workshop, a number of Mine Waste Technology Program (MWTP) projects will be presented in order to highlight the most successful technology demonstrations. Recent results, lesson learned and future opportunities will be presented. The MWTP projects includ...

  16. Process Improvement for Next Generation Space Flight Vehicles: MSFC Lessons Learned

    NASA Technical Reports Server (NTRS)

    Housch, Helen

    2008-01-01

    This viewgraph presentation reviews the lessons learned from process improvement for Next Generation Space Flight Vehicles. The contents include: 1) Organizational profile; 2) Process Improvement History; 3) Appraisal Preparation; 4) The Appraisal Experience; 5) Useful Tools; and 6) Is CMMI working?

  17. Collaboration Technology in Military Operations: Lessons Learned from the Corporate Domain

    DTIC Science & Technology

    2006-02-01

    Learned from the Corporate Domain Topics: Social Domain Issues, Cognitive Domain Issues, C2 Experimentation Authors: Stacey D. Scott, M. L. Cummings, David...AFRL-HE-WP-TP-2006-0029 AIR FORCE RESEARCH LABORATORY Collaboration Technology in Military Operations: Lessons Learned from the Corporate Domain...OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 1 hour per response , including the time for

  18. Lessons Learned from the Node 1 Atmosphere Control and Storage and Water Recovery and Management Subsystem Design

    NASA Technical Reports Server (NTRS)

    Williams, David E.

    2010-01-01

    Node 1 flew to the International Space Station (ISS) on Flight 2A during December 1998. To date the National Aeronautics and Space Administration (NASA) has learned a lot of lessons from this module based on its history of approximately two years of acceptance testing on the ground and currently its twelve years on-orbit. This paper will provide an overview of the ISS Environmental Control and Life Support (ECLS) design of the Node 1 Atmosphere Control and Storage (ACS) and Water Recovery and Management (WRM) subsystems and it will document some of the lessons that have been learned to date for these subsystems based on problems prelaunch, problems encountered on-orbit, and operational problems/concerns. It is hoped that documenting these lessons learned from ISS will help in preventing them in future Programs.

  19. Lessons Learned from the Node 1 Atmosphere Control and Storage and Water Recovery and Management Subsystem Design

    NASA Technical Reports Server (NTRS)

    Williams, David E.

    2011-01-01

    Node 1 flew to the International Space Station (ISS) on Flight 2A during December 1998. To date the National Aeronautics and Space Administration (NASA) has learned a lot of lessons from this module based on its history of approximately two years of acceptance testing on the ground and currently its twelve years on-orbit. This paper will provide an overview of the ISS Environmental Control and Life Support (ECLS) design of the Node 1 Atmosphere Control and Storage (ACS) and Water Recovery and Management (WRM) subsystems and it will document some of the lessons that have been learned to date for these subsystems based on problems prelaunch, problems encountered on-orbit, and operational problems/concerns. It is hoped that documenting these lessons learned from ISS will help in preventing them in future Programs.

  20. Empirically Derived Lessons Learned about What Makes Peer-Led Exercise Groups Flourish.

    PubMed

    Fletcher, Kathlyn E; Ertl, Kristyn; Ruffalo, Leslie; Harris, LaTamba; Whittle, Jeff

    2017-01-01

    Physical exercise confers many health benefits, but it is difficult to motivate people to exercise. Although community exercise groups may facilitate initiation and persistence in an exercise program, reports regarding factors that allow such groups to flourish are limited. We performed a prospective qualitative evaluation of our experience starting a program of community-based, peer-led exercise groups for military veterans to identify important lessons learned. We synthesized data from structured observations, post-observation debriefings, and focus groups. Our participants were trained peer leaders and exercise group members. Our main outcomes consisted of empirically derived lessons learned during the implementation of a peer-led group exercise program for veterans at multiple community sites. We collected and analyzed data from 40 observation visits (covering 14 sites), 7 transcribed debriefings, and 5 focus groups. We identified five lessons learned. (1) The camaraderie and social aspect of the exercise groups provided motivation for people to stay involved. (2) Shared responsibility and commitment to each other by the group members was instrumental to success. (3) Regular meeting times encouraged participation. (4) Variety, especially getting outdoors, was very popular for some groups. (5) Modest involvement of professionals encouraged ongoing engagement with the program. Both social and programmatic issues influence implementation of group exercise programs for older, predominantly male, veterans. These results should be confirmed in other settings.

  1. Lessons learned in using IPE model for IPEEE study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Guey, C.

    1995-12-31

    This paper summarizes lessons learned in applying the plant model developed in the Individual Plant Examination (IPE) to the IPE for External Events (IPEEE). Both core damage frequency and containment performance features are addressed. The IPE model applications are discussed for internal fires, hurricanes, and tornadoes. Areas in which the IPE model may be improved and general findings are described.

  2. An Evaluation of Privatized Military Family Housing: Lessons Learned

    DTIC Science & Technology

    2012-06-01

    NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA MBA PROFESSIONAL REPORT An Evaluation of Privatized Military Family Housing...TYPE AND DATES COVERED MBA Professional Report 4. TITLE AND SUBTITLE An Evaluation of Privatized Military Family Housing: Lessons Learned 5...Peeler et al. 2007, chap. 5, 105). Baldwin (1996) reports that during the 1960s and 1970s military family housing privatization programs fell out of

  3. Transforming Effective Army Units: Best Practices and Lessons Learned

    DTIC Science & Technology

    2013-08-01

    Unlimited 106 Dorothy Young 703-545-2316 ii iii Technical Report 1326 Effective Army Units: Best Practices and Lessons Learned...SBCT units at Joint Base Lewis -McChord (JBLM), and two civilian subject matter experts on transformation from the Program Manager (PM) Stryker and...ISR Intelligence, Surveillance, Reconnaissance JBLM Joint Base Lewis -McChord JRTC Joint Readiness Training Center A-2 LNO Liaison

  4. Sharing lessons learned and best practices in deactivation and decommissioning techniques among U.S. Department of Energy contractors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lackey, Michael B.; Waisley, Sandra L.; Dusek, Lansing G.

    2007-07-01

    Approximately $153.2 billion of work currently remains in the United States Department of Energy's (DOE's) Office of Environmental Management (EM) life cycle budget for United States projects. Contractors who manage facilities for the DOE have been challenged to identify transformational changes to reduce the life cycle costs and develop a knowledge management system that identifies, disseminates, and tracks the implementation of lessons learned and best practices. At the request of the DOE's EM Office of Engineering and Technology, the Energy Facility Contractors Group (EFCOG) responded to the challenge with formation of the Deactivation and Decommissioning (D and D) and Facilitymore » Engineering (DD/FE) Working Group. Since October 2006, members have already made significant progress in realizing their goals: adding new D and D best practices to the existing EFCOG Best Practices database; participating in lessons learned forums; and contributing to a DOE initiative on identifying technology needs. The group is also participating in a DOE project management initiative to develop implementation guidelines, as well as a DOE radiation protection initiative to institute a more predictable and standardized approach to approving authorized limits and independently verifying cleanup completion at EM sites. Finally, a D and D hotline to provide real-time solutions to D and D challenges is also being launched. (authors)« less

  5. Solar Decathlon 2017: Final Report and Lessons Learned

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Incorporated, Energetics

    This final report introduces the Solar Decathlon 2017 Program Administrator, Core Advisory Committee, event sponsors and donors, and regional stakeholders that were integral to the success of Solar Decathlon 2017. The substantial balance of this report presents evaluative metrics and lessons learned about the primary aspects of administering Solar Decathlon 2017, including Project Management, Competition and Site Management, Stakeholder Engagement, Communications, Sponsor Management, Education Programming, and Volunteer Coordination. Several appendices compliment the discussion.

  6. Denmark's Master of Public Governance Program: Assessment and Lessons Learned

    ERIC Educational Resources Information Center

    Greve, Carsten; Pedersen, Anne Reff

    2017-01-01

    This paper focuses on Denmark's Master of Public Governance and its assessments and lessons learned. Denmark is seen to have an efficient economy and public sector, a digitalized public service delivery system, and an advanced work-life balance. The Danish government invested substantial resources into developing a Master of Public Governance…

  7. Using Noldus Observer XT for research on deaf signers learning to read: an innovative methodology.

    PubMed

    Ducharme, Daphne A; Arcand, Isabelle

    2009-08-01

    Despite years of research on the reading problems of deaf students, we still do not know how deaf signers who read well actually crack the code of print. How connections are made between sign language and written language is still an open question. In this article, we show how the Noldus Observer XT software can be used to conduct an in-depth analysis of the online behavior of deaf readers. First, we examine factors that may have an impact on reading behavior. Then, we describe how we videotaped teachers with their deaf student signers of langue des signes québécoise during a reading task, how we conducted a recall activity to better understand the students' reading behavior, and how we used this innovative software to analyze the taped footage. Finally, we discuss the contribution this type of research can have on the future reading behavior of deaf students.

  8. Project-Based Learning Using Discussion and Lesson-Learned Methods via Social Media Model for Enhancing Problem Solving Skills

    ERIC Educational Resources Information Center

    Jewpanich, Chaiwat; Piriyasurawong, Pallop

    2015-01-01

    This research aims to 1) develop the project-based learning using discussion and lesson-learned methods via social media model (PBL-DLL SoMe Model) used for enhancing problem solving skills of undergraduate in education student, and 2) evaluate the PBL-DLL SoMe Model used for enhancing problem solving skills of undergraduate in education student.…

  9. Lessons Learned During Instrument Testing for the Thermal Infrared Sensor (TIRS)

    NASA Technical Reports Server (NTRS)

    Peabody, Hume L.; Otero, Veronica; Neuberger, David

    2013-01-01

    The Themal InfraRed Sensor (TIRS) instrument, set to launch on the Landsat Data Continuity Mission in 2013, features a passively cooled telescope and IR detectors which are actively cooled by a two stage cryocooler. In order to proceed to the instrument level test campaign, at least one full functional test was required, necessitating a thermal vacuum test to sufficiently cool the detectors and demonstrate performance. This was fairly unique in that this test occurred before the Pre Environmental Review, but yielded significant knowledge gains before the planned instrument level test. During the pre-PER test, numerous discrepancies were found between the model and the actual hardware, which were revealed by poor correlation between model predictions and test data. With the inclusion of pseudo-balance points, the test also provided an opportunity to perform a pre-correlation to test data prior to the instrument level test campaign. Various lessons were learned during this test related to modeling and design of both the flight hardware and the Ground Support Equipment and test setup. The lessons learned in the pre-PER test resulted in a better test setup for the nstrument level test and the completion of the final instrument model correlation in a shorter period of time. Upon completion of the correlation, the flight predictions were generated including the full suite of off-nominal cases, including some new cases defined by the spacecraft. For some of these ·new cases, some components now revealed limit exceedances, in particular for a portion of the hardware that could not be tested due to its size and chamber limitations.. Further lessons were learned during the completion of flight predictions. With a correlated detalled instrument model, significant efforts were made to generate a reduced model suitable for observatory level analyses. This proved a major effort both to generate an appropriate network as well as to convert to the final model to the required

  10. Human biomonitoring in Israel: Recent results and lessons learned.

    PubMed

    Berman, Tamar; Goldsmith, Rebecca; Levine, Hagai; Grotto, Itamar

    2017-03-01

    The use of human biomonitoring (HBM) as a tool for environmental health policy and research is developing rapidly in Israel. Despite challenges in securing political and financial support for HBM, the Ministry of Health has initiated national HBM studies and has utilized HBM data in environmental health policy decision making. Currently, the Ministry of Health is collecting urine samples from children and adults in the framework of the National Health and Nutrition Study (MABAT), with the goal of ongoing surveillance of population exposure to pesticides and environmental tobacco smoke, and of combining HBM data with data on diet and health behavior. In academic research studies in Israel, biomarkers are used increasingly in environmental epidemiology, including in three active birth cohort studies on adverse health effects of phthalates, brominated flame retardants, and organophosphate pesticides. Future Ministry of Health goals include establishing HBM analytical capabilities, developing a long term national HBM plan for Israel and participating in the proposed HBM4EU project in order to improve data harmonization. One of the lessons learned in Israel is that even in the absence of a formal HBM program, it is possible to collect meaningful HBM data and use it in an ad hoc fashion to support environmental health policy. Copyright © 2016 Elsevier GmbH. All rights reserved.

  11. Utilization of Lesson Analysis as Teacher Self Reflection to Improve the Lesson Design on Chemical Equation Topic

    NASA Astrophysics Data System (ADS)

    Edyani, E. A.; Supriatna, A.; Kurnia; Komalasari, L.

    2017-02-01

    The research is aimed to investigate how lesson analysis as teacher’s self-reflection changes the teacher’s lesson design on chemical equation topic. Lesson Analysis has been used as part of teacher training programs to improve teacher’s ability in analyzing their own lesson. The method used in this research is a qualitative method. The research starts from build lesson design, implementation lesson design to senior high school student, utilize lesson analysis to get information about the lesson, and revise lesson design. The revised lesson design from the first implementation applied to the second implementation, resulting in better design. This research use lesson analysis Hendayana&Hidayat framework. Video tapped and transcript are employed on each lesson. After first implementation, lesson analysis result shows that teacher-centered still dominating the learning because students are less active in discussion, so the part of lesson design must be revised. After second implementation, lesson analysis result shows that the learning already student-centered. Students are very active in discussion. But some part of learning design still must be revised. In general, lesson analysis was effective for teacher to reflect the lessons. Teacher can utilize lesson analysis any time to improve the next lesson design.

  12. The CanMars Analogue Mission: Lessons Learned for Mars Sample Return

    NASA Astrophysics Data System (ADS)

    Osinski, G. R.; Beaty, D.; Battler, M.; Caudill, C.; Francis, R.; Haltigin, T.; Hipkin, V.; Pilles, E.

    2018-04-01

    We present an overview and lessons learned for Mars Sample Return from CanMars — an analogue mission that simulated a Mars 2020-like cache mission. Data from 39 sols of operations conducted in the Utah desert in 2015 and 2016 are presented.

  13. Self-expanding Portico Valve Versus Balloon-expandable SAPIEN XT Valve in Patients With Small Aortic Annuli: Comparison of Hemodynamic Performance.

    PubMed

    Del Trigo, María; Dahou, Abdellaziz; Webb, John G; Dvir, Danny; Puri, Rishi; Abdul-Jawad Altisent, Omar; Campelo-Parada, Francisco; Thompson, Chris; Leipsic, Jonathon; Stub, Dion; DeLarochellière, Robert; Paradis, Jean-Michel; Dumont, Eric; Doyle, Daniel; Mohammadi, Siamak; Pasian, Sergio; Côté, Melanie; Pibarot, Philippe; Rodés-Cabau, Josep

    2016-05-01

    The self-expanding Portico valve is a new transcatheter aortic valve system yielding promising preliminary results, yet there are no comparative data against earlier generation transcatheter aortic valve systems. The aim of this study was to compare the hemodynamic performance of the Portico and balloon-expandable SAPIEN XT valves in a case-matched study with echocardiographic core laboratory analysis. Twenty-two patients underwent transcatheter aortic valve implantation with the Portico 23-mm valve and were matched for aortic annulus area and mean diameter measured by multidetector computed tomography, left ventricular ejection fraction, body surface area, and body mass index with 40 patients treated with the 23-mm SAPIEN XT. Mean aortic annulus diameters were 19.6±1.3mm by transthoracic echocardiography and 21.4±1.2mm by computed tomography, with no significant between-group differences. Doppler echocardiographic images were collected at baseline and at 1-month of follow-up and were analyzed in a central echocardiography core laboratory. There were no significant between-group differences in residual mean transaortic gradients (SAPIEN XT: 10.4±3.7mmHg; Portico: 9.8±1.1mmHg; P=.49) and effective orifice areas (SAPIEN XT: 1.36±0.27cm(2); Portico, 1.37±.29cm(2); P=.54). Rates of severe prosthesis-patient mismatch (effective orifice area<0.65cm(2)/m(2)) were similar (SAPIEN XT: 13.5%; Portico: 10.0%; P=.56). No between-group differences were found in the occurrence of moderate-severe paravalvular leaks (5.0% vs 4.8% of SAPIEN XT and Portico respectively; P=.90). Transcatheter aortic valve implantation with the self-expanding Portico system yielded similar short-term hemodynamic performance compared with the balloon-expandable SAPIEN XT system for treating patients with severe aortic stenosis and small annuli. Further prospective studies with longer-term follow-up and in patients with larger aortic annuli are required. Copyright © 2015 Sociedad Española de

  14. IVHS Institutional Issues and Case Studies, Analysis and Lessons Learned, Final Report

    DOT National Transportation Integrated Search

    1994-04-01

    This 'Analysis and Lessons Learned' report contains observations, conclusions, and recommendations based on the performance of six case studies of Intelligent Vehicle-Highway Systems (IVHS) projects. Information to support the development of the case...

  15. Lessons Learned from the Space Shuttle Engine Cutoff System (ECO) Anomalies

    NASA Technical Reports Server (NTRS)

    Martinez, Hugo E.; Welzyn, Ken

    2011-01-01

    The Space Shuttle Orbiter's main engine cutoff (ECO) system first failed ground checkout in April, 2005 during a first tanking test prior to Return-to-Flight. Despite significant troubleshooting and investigative efforts that followed, the root cause could not be found and intermittent anomalies continued to plague the Program. By implementing hardware upgrades, enhancing monitoring capability, and relaxing the launch rules, the Shuttle fleet was allowed to continue flying in spite of these unexplained failures. Root cause was finally determined following the launch attempts of STS-122 in December, 2007 when the anomalies repeated, which allowed drag-on instrumentation to pinpoint the fault (the ET feedthrough connector). The suspect hardware was removed and provided additional evidence towards root cause determination. Corrective action was implemented and the system has performed successfully since then. This white paper presents the lessons learned from the entire experience, beginning with the anomalies since Return-to-Flight through discovery and correction of the problem. To put these lessons in better perspective for the reader, an overview of the ECO system is presented first. Next, a chronological account of the failures and associated investigation activities is discussed. Root cause and corrective action are summarized, followed by the lessons learned.

  16. Lessons learned from modern military surgery.

    PubMed

    Beekley, Alec C; Starnes, Benjamin W; Sebesta, James A

    2007-02-01

    The era of global terrorism and asymmetric warfare heralded by the September 11, 2001 attacks on the United States have blurred the traditional lines between civilian and military trauma. The lessons learned by physicians in the theaters of war, particularly regarding the response to mass casualties, blast and fragmentation injuries, and resuscitation of casualties in austere environments, likely resonate strongly with civilian trauma surgeons in the current era. The evolution of a streamlined trauma system in the theaters of operations, the introduction of an in-theater institution review board process, and dedicated personnel to collect combat casualty data have resulted in improved data capture and realtime, on-the-scene research.

  17. Coping with Multiple Suicides among Middle School Students. Lessons Learned from School Crises and Emergencies. Volume 2, Issue 2

    ERIC Educational Resources Information Center

    US Department of Education, 2007

    2007-01-01

    "Lessons Learned" is a series of publications that are a brief recounting of actual school emergencies and crises. This "Lessons Learned" issue addresses the experience of a school district where three middle school students hung themselves within a three-week timeframe. Although deaths were apparently unconnected, the school district is part of a…

  18. Lessons Learned from the Arizona Galileoscope Star Party Program

    NASA Astrophysics Data System (ADS)

    Pompea, Stephen M.; Sparks, R. T.; Dugan, C.; Walker, C. E.

    2013-01-01

    The National Optical Astronomy Observatory has joined together multiple audiences in various communities to conduct outreach using Galileoscopes. The audience consists of 5th grade students and teachers, their families and friends, and anyone else who wants to attend a special star party led by students using Galileoscopes. However, across one community there are many subcultures that one should be responsive to in the program design. The program model, which has been independently evaluated, combines professional development and classroom visits by NOAO education practitioners with the goal of a community star party. We have conducted the program in several mid-sized Arizona cities after an initial prototype star party held near the state capitol building in Phoenix. In this program, with Galileoscopes purchased with funding from Science Foundation Arizona, we have now held Galileoscope star parties in Flagstaff, Safford, and Globe, with two programs in Yuma, Arizona. We will discuss planning efforts, professional development plans and lessons learned, and specific logistical issues that have arisen in the program. Although the professional development component for teachers is rather traditional, the overall lessons learned are applicable to many astronomy programs for non-traditional audiences.

  19. Lessons Learned from the Wide Field Camera 3 TV1 and TV2 Thermal Vacuum Test Campaigns

    NASA Technical Reports Server (NTRS)

    Peabody, Hume; Stavely, Richard; Bast, William

    2008-01-01

    The Wide Field Camera 3 (WFC3) instrument has undergone two complete thermal vacuum tests (TV1 and TV2), during which valuable lessons were learned regarding test configuration, test execution, model capabilities, and modeling practices. The very complex thermal design of WFC3 produced a number of challenging aspects to ground testing with numerous ThermoElectric Coolers and heat pipes, not all of which were functional. Lessons learned during TV1 resulted in significant upgrades to the model capabilities and a change in the test environment approach for TV2. These upgrades proved invaluable during TV2 when pretest modeling assumptions proved to be false. Each of the lessons learned relate to one of two following broad statements: 1. Ensure the design can be tested and that the effect of non-flight like conditions is well understood, particularly with respect to non passive devices (TECs, Heat Pipes, etc) 2. Ensure that the model is sufficiently detailed and is capable of predicting off-nominal behavior and the power dissipation of any thermal devices, especially TECs This paper outlines a number of the lessons learned over these two test campaigns with respect to the thermal design, model, and test configuration and presents recommendations for future tests.

  20. The 2015 Nepal earthquake disaster: lessons learned one year on.

    PubMed

    Hall, M L; Lee, A C K; Cartwright, C; Marahatta, S; Karki, J; Simkhada, P

    2017-04-01

    The 2015 earthquake in Nepal killed over 8000 people, injured more than 21,000 and displaced a further 2 million. One year later, a national workshop was organized with various Nepali stakeholders involved in the response to the earthquake. The workshop provided participants an opportunity to reflect on their experiences and sought to learn lessons from the disaster. One hundred and thirty-five participants took part and most had been directly involved in the earthquake response. They included representatives from the Ministry of Health, local and national government, the armed forces, non-governmental organizations, health practitioners, academics, and community representatives. Participants were divided into seven focus groups based around the following topics: water, sanitation and hygiene, hospital services, health and nutrition, education, shelter, policy and community. Facilitated group discussions were conducted in Nepalese and the key emerging themes are presented. Participants described a range of issues encountered, some specific to their area of expertize but also more general issues. These included logistics and supply chain challenges, leadership and coordination difficulties, impacts of the media as well as cultural beliefs on population behaviour post-disaster. Lessons identified included the need for community involvement at all stages of disaster response and preparedness, as well as the development of local leadership capabilities and community resilience. A 'disconnect' between disaster management policy and responses was observed, which may result in ineffective, poorly planned disaster response. Finding time and opportunity to reflect on and identify lessons from disaster response can be difficult but are fundamental to improving future disaster preparedness. The Nepal Earthquake National Workshop offered participants the space to do this. It garnered an overwhelming sense of wanting to do things better, of the need for a Nepal-centric approach

  1. Creating the High-Resolution Settlement Layer - lessons learned

    NASA Astrophysics Data System (ADS)

    Gros, A.

    2017-12-01

    Facebook publishes the High-resolution Settlement Layer (HRSL: https://ciesin.columbia.edu/data/hrsl/) in collaboration with Columbia University's CIESIN institute and the World Bank. So far, data for 13 countries have been published over the past nine months. HRSL data for Burkina Faso, Ghana, Haiti, Ivory Coast, Madagascar, Malawi, Mexico, The Philippines, Rwanda, South Africa, Sri Lanka, Thailand, and Uganda are available for download. We will present a status update and report on lessons learned.

  2. Lessons Not Learned: Civil-Military Disconnect in Afghanistan

    DTIC Science & Technology

    2010-09-01

    NATO- COL. CHARLES D. ALLEN is a retired Army officer and a professor of cultural science at the Army War College. PERSPECTIVES Lessons not learned...T he relief of two four-star operational commanders inAfghanistan, America’s “ war of necessity,” warrants anexamination of not only civil-military...respected offi- cer with a stellar reputation within the Army, he was responsi- ble for the secondary theater of war while the national focus was on

  3. NASA Flight Planning Branch Space Shuttle Lessons Learned

    NASA Technical Reports Server (NTRS)

    Clevenger, Jennifer D.; Bristol, Douglas J.; Whitney, Gregory R.; Blanton, Mark R.; Reynolds, F. Fisher, III

    2011-01-01

    Planning products and procedures that allowed the mission Flight Control Teams and the Astronaut crews to plan, train and fly every Space Shuttle mission were developed by the Flight Planning Branch at the NASA Johnson Space Center in Houston, Texas. As the Space Shuttle Program came to a close, lessons learned were collected from each phase of the successful execution of these Space Shuttle missions. Specific examples of how roles and responsibilities of console positions that develop the crew and vehicle attitude timelines have been analyzed and will be discussed. Additionally, the relationships and procedural hurdles experienced through international collaboration have molded operations. These facets will be explored and related to current and future operations with the International Space Station and future vehicles. Along with these important aspects, the evolution of technology and continual improvement of data transfer tools between the Space Shuttle and ground team has also defined specific lessons used in improving the control team s effectiveness. Methodologies to communicate and transmit messages, images, and files from the Mission Control Center to the Orbiter evolved over several years. These lessons were vital in shaping the effectiveness of safe and successful mission planning and have been applied to current mission planning work in addition to being incorporated into future space flight planning. The critical lessons from all aspects of previous plan, train, and fly phases of Space Shuttle flight missions are not only documented in this paper, but are also discussed regarding how they pertain to changes in process and consideration for future space flight planning.

  4. Development of X-33/X-34 Aerothermodynamic Data Bases: Lessons Learned and Future Enhancements

    NASA Technical Reports Server (NTRS)

    Miller, C. G.

    1999-01-01

    A synoptic of programmatic and technical lessons learned in the development of aerothermodynamic data bases for the X-33 and X-34 programs is presented in general terms and from the perspective of the NASA Langley Research Center Aerothermodynamics Branch. The format used is that of the aerothermodynamic chain, the links of which are personnel, facilities, models/test articles, instrumentation, test techniques, and computational fluid dynamics (CFD). Because the aerodynamic data bases upon which the X-33 and X-34 vehicles will fly are almost exclusively from wind tunnel testing, as opposed to CFD, the primary focus of the lessons learned is on ground-based testing.

  5. AFRL Solid Propellant Laboratory Explosive Siting and Renovation Lessons Learned

    DTIC Science & Technology

    2010-05-19

    AFRL Solid Propellant Laboratory Explosive Siting and Renovation Lessons Learned Daniel F. Schwartz Air Force Research Laboratory ...9. SPONSORING / MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S) Air Force Research Laboratory (AFMC) AFRL /RZS...provide the United States Air Force with advanced rocket propulsion technologies, the Air Force Research

  6. Soft x-ray imager (SXI) onboard the NeXT satellite

    NASA Astrophysics Data System (ADS)

    Tsuru, Takeshi Go; Takagi, Shin-Ichiro; Matsumoto, Hironori; Inui, Tatsuya; Ozawa, Midori; Koyama, Katsuji; Tsunemi, Hiroshi; Hayashida, Kiyoshi; Miyata, Emi; Ozawa, Hideki; Touhiguchi, Masakuni; Matsuura, Daisuke; Dotani, Tadayasu; Ozaki, Masanobu; Murakami, Hiroshi; Kohmura, Takayoshi; Kitamoto, Shunji; Awaki, Hisamitsu

    2006-06-01

    We give overview and the current status of the development of the Soft X-ray Imager (SXI) onboard the NeXT satellite. SXI is an X-ray CCD camera placed at the focal plane detector of the Soft X-ray Telescopes for Imaging (SXT-I) onboard NeXT. The pixel size and the format of the CCD is 24 x 24μm (IA) and 2048 x 2048 x 2 (IA+FS). Currently, we have been developing two types of CCD as candidates for SXI, in parallel. The one is front illumination type CCD with moderate thickness of the depletion layer (70 ~ 100μm) as a baseline plan. The other one is the goal plan, in which we develop back illumination type CCD with a thick depletion layer (200 ~ 300μm). For the baseline plan, we successfully developed the proto model 'CCD-NeXT1' with the pixel size of 12μm x 12μm and the CCD size of 24mm x 48mm. The depletion layer of the CCD has reached 75 ~ 85μm. The goal plan is realized by introduction of a new type of CCD 'P-channel CCD', which collects holes in stead of electrons in the common 'N-channel CCD'. By processing a test model of P-channel CCD we have confirmed high quantum efficiency above 10 keV with an equivalent depletion layer of 300μm. A back illumination type of P-channel CCD with a depletion layer of 200μm with aluminum coating for optical blocking has been also successfully developed. We have been also developing a thermo-electric cooler (TEC) with the function of the mechanically support of the CCD wafer without standoff insulators, for the purpose of the reduction of thermal input to the CCD through the standoff insulators. We have been considering the sensor housing and the onboard electronics for the CCD clocking, readout and digital processing of the frame date.

  7. Lessons that Last: Former Youth Organizers' Reflections on What and How They Learned

    ERIC Educational Resources Information Center

    Conner, Jerusha

    2014-01-01

    This study examines the learning outcomes and learning environment of a youth organizing program that has been effective in promoting individual as well as social change. Drawing on interviews with 25 former youth organizers from the program, this study explores the lessons that stay with them as they transition to young adulthood and the factors…

  8. Dynamic Lesson Planning in EFL Reading Classes through a New e-Learning System

    ERIC Educational Resources Information Center

    Okada, Takeshi; Sakamoto, Yasunobu

    2015-01-01

    This paper illustrates how lesson plans, teaching styles and assessment can be dynamically adapted on a real-time basis during an English as a Foreign Language (EFL) reading classroom session by using a new e-learning system named iBELLEs (interactive Blended English Language Learning Enhancement system). iBELLEs plays a crucial role in filling…

  9. Managing an Infectious Disease Outbreak in a School. Lessons Learned from School Crises and Emergencies. Volume 2, Issue 3

    ERIC Educational Resources Information Center

    US Department of Education, 2007

    2007-01-01

    "Lessons Learned" is a series of publications that are a brief recounting of actual school emergencies and crises. This "Lessons Learned" issue focuses on an infectious disease incident, which resulted in the death of a student, closure of area schools and the operation of an on-site school vaccine clinic. The report highlights the critical need…

  10. Patient safety: lessons learned.

    PubMed

    Bagian, James P

    2006-04-01

    The traditional approach to patient safety in health care has ranged from reticence to outward denial of serious flaws. This undermines the otherwise remarkable advances in technology and information that have characterized the specialty of medical practice. In addition, lessons learned in industries outside health care, such as in aviation, provide opportunities for improvements that successfully reduce mishaps and errors while maintaining a standard of excellence. This is precisely the call in medicine prompted by the 1999 Institute of Medicine report "To Err Is Human: Building a Safer Health System." However, to effect these changes, key components of a successful safety system must include: (1) communication, (2) a shift from a posture of reliance on human infallibility (hence "shame and blame") to checklists that recognize the contribution of the system and account for human limitations, and (3) a cultivation of non-punitive open and/or de-identified/anonymous reporting of safety concerns, including close calls, in addition to adverse events.

  11. Mobile English Learning: An Evidence-Based Study with Fifth Graders

    ERIC Educational Resources Information Center

    Sandberg, Jacobijn; Maris, Marinus; de Geus, Kaspar

    2011-01-01

    Three groups participated in a study on the added value of mobile technology for learning English as a second language for primary school students. The first group had classroom lessons in English about zoo animals and their characteristics. The second group took classroom lessons and worked with a mobile application on location in a public zoo.…

  12. Special nuclear materials cutoff exercise: Issues and lessons learned. Volume 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Libby, R.A.; Segal, J.E.; Stanbro, W.D.

    1995-08-01

    This document is appendices D-J for the Special Nuclear Materials Cutoff Exercise: Issues and Lessons Learned. Included are discussions of the US IAEA Treaty, safeguard regulations for nuclear materials, issue sheets for the PUREX process, and the LANL follow up activity for reprocessing nuclear materials.

  13. E-Learning and the iNtegrating Technology for InQuiry (NTeQ) Model Lesson Design

    ERIC Educational Resources Information Center

    Flake, Lee Hatch

    2017-01-01

    The author reflects on the history of technology in education and e-learning and introduces the iNtegrating Technology for inQuiry (NTeQ) model of lesson design authored by Morrison and Lowther (2005). The NTeQ model lesson design is a new pedagogy for academic instruction in response to the growth of the Internet and technological advancements in…

  14. Preparing for the Worst: Psychological Excellence of First Responders - A Katrina Lessons Learned Study

    DTIC Science & Technology

    2008-01-01

    cases on human cognition and performance. For instance, when you learn to fly an airplane, you will be instructed to use a simple rule to avoid...Existing Training Technologies; First Responders; Katrina; Lesson Learned 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT 18. NUMBER... student . Based in Maryland, the training institute prepares first responders using online learning courses or training exercises. Such topics

  15. Issues in Violent Risk Assessment: Lessons Learned and Future Directions

    ERIC Educational Resources Information Center

    Kroner, Daryl G.

    2005-01-01

    Realizing that the assessment of dangerousness with a yes/no format as a poor form of violent risk assessment has been the most important lesson learned about violence in the last 20 years. Further examining (a) what outcome and (b) how the indicators of the outcome should be measured has resulted in better violent risk assessment. The most…

  16. SOCAP: Lessons learned in applying SIPE-2 to the military operations crisis action planning domain

    NASA Technical Reports Server (NTRS)

    Desimone, Roberto

    1992-01-01

    This report describes work funded under the DARPA Planning and Scheduling Initiative that led to the development of SOCAP (System for Operations Crisis Action Planning). In particular, it describes lessons learned in applying SIPE-2, the underlying AI planning technology within SOCAP, to the domain of military operations deliberate and crisis action planning. SOCAP was demonstrated at the U.S. Central Command and at the Pentagon in early 1992. A more detailed report about the lessons learned is currently being prepared. This report was presented during one of the panel discussions on 'The Relevance of Scheduling to AI Planning Systems.'

  17. Spent Nuclear Fuel Trasportation: An Examination of Potential Lessons Learned From Prior Shipping Campaigns

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    M. Keister; K, McBride

    The Nuclear Waste Policy Act of 1982 (NWPA), as amended, assigned the Department of Energy (DOE) responsibility for developing and managing a Federal system for the disposal of spent nuclear fuel (SNF) and high-level radioactive waste (HLW). The Office of Civilian Radioactive Waste Management (OCRWM) is responsible for accepting, transporting, and disposing of SNF and HLW at the Yucca Mountain repository (if licensed) in a manner that protects public health, safety, and the environment; enhances national and energy security; and merits public confidence. OCRWM faces a near-term challenge--to develop and demonstrate a transportation system that will sustain safe and efficientmore » shipments of SNF and HLW to a repository. To better inform and improve its current planning, OCRWM has extensively reviewed plans and other documents related to past high-visibility shipping campaigns of SNF and other radioactive materials within the United States. This report summarizes the results of this review and, where appropriate, lessons learned. The objective of this lessons learned study was to identify successful, best-in-class trends and commonalities from past shipping campaigns, which OCRWM could consider when planning for the development and operation of a repository transportation system. Note: this paper is for analytical and discussion purposes only, and is not an endorsement of, or commitment by, OCRWM to follow any of the comments or trends. If OCRWM elects to make such commitments at a future time, they will be appropriately documented in formal programmatic policy statements, plans and procedures. Reviewers examined an extensive study completed in 2003 by DOE's National Transportation Program (NTP), Office of Environmental Management (EM), as well as plans and documents related to SNF shipments since issuance of the NTP report. OCRWM examined specific planning, business, institutional and operating practices that have been identified by DOE, its transportation

  18. Skylab lessons learned as applicable to a large space station, 1967-1974. Ph.D. Thesis - Catholic Univ. of Am.

    NASA Technical Reports Server (NTRS)

    Schneider, W. C.

    1976-01-01

    This report records some of the lessons learned during Skylab development. The approach taken is to list lessons which could have wide application in the development of a large space station. The lessons are amplified and explained in light of the background and experiences of the Skylab development.

  19. An Interview with Joe McMann: Lessons Learned from Fifty Years of Observing Hardware and Human Behavior

    NASA Technical Reports Server (NTRS)

    McMann, Joe

    2011-01-01

    Pica Kahn conducted "An Interview with Joe McMann: Lessons Learned in Human and Hardware Behavior" on August 16, 2011. With more than 40 years of experience in the aerospace industry, McMann has gained a wealth of knowledge. This presentation focused on lessons learned in human and hardware behavior. During his many years in the industry, McMann observed that the hardware development process was intertwined with human influences, which impacted the outcome of the product.

  20. The Effects of Variations in Lesson Control and Practice on Learning from Interactive Video.

    ERIC Educational Resources Information Center

    Hannafin, Michael J.; Colamaio, MaryAnne E.

    1987-01-01

    Discussion of the effects of variations in lesson control and practice on the learning of facts, procedures, and problem-solving skills during interactive video instruction focuses on a study of graduates and advanced level undergraduates learning cardiopulmonary resuscitation (CPR). Embedded questioning methods and posttests used are described.…

  1. 77 FR 21813 - Changes to the Generic Aging Lessons Learned (GALL) Report Revision 2 AMP XI.M41, “Buried and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-11

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0055] Changes to the Generic Aging Lessons Learned (GALL) Report Revision 2 AMP XI.M41, ``Buried and Underground Piping and Tanks'' AGENCY: Nuclear Regulatory... NUREG-1801, Revision 2, ``Generic Aging Lessons Learned (GALL) Report,'' and the NRC staff's aging...

  2. Lessons Learned Planning a Statewide Conference: "Alabama's Choice--Tobacco or Health?"

    ERIC Educational Resources Information Center

    Geiger, Brian F.

    This paper describes lessons learned while planning a statewide conference to increase the knowledge of tobacco control advocates and promote implementation of the Alabama Comprehensive Tobacco Use Prevention and Control Plan (Plan) within the state. The Plan has three overall goals: preventing youth from becoming tobacco users; promoting…

  3. Early Lessons Learned from Extramural School Programs That Offer HPV Vaccine

    ERIC Educational Resources Information Center

    Hayes, Kim A.; Entzel, Pamela; Berger, Wendy; Caskey, Rachel N.; Shlay, Judith C.; Stubbs, Brenda W.; Smith, Jennifer S.; Brewer, Noel T.

    2013-01-01

    Background: There has been little evaluation of school-located vaccination programs that offer human papillomavirus (HPV) vaccine in US schools without health centers (ie, extramural programs). This article summarizes lessons learned from such programs. Methods: In July to August 2010, 5 programs were identi?ed. Semistructured, in-depth telephone…

  4. Operations to Research: Communication of Lessons Learned

    NASA Technical Reports Server (NTRS)

    Fogarty, Jennifer

    2009-01-01

    This presentation explores ways to build upon previous spaceflight experience and communicate this knowledge to prepare for future exploration. An operational approach is highlighted, focusing on selection and retention standards (disease screening and obtaining medical histories); pre-, in-, and post-flight monitoring (establishing degrees of bone loss, skeletal muscle loss, cardiovascular deconditioning, medical conditions, etc.); prevention, mitigation, or treatment (in-flight countermeasures); and, reconditioning, recovery, and reassignment (post-flight training regimen, return to pre-flight baseline and flight assignment). Experiences and lessons learned from the Apollo, Skylab, Shuttle, Shuttle-Mir, International Space Station, and Orion missions are outlined.

  5. Examining Teachers' Understanding of the Mathematical Learning Progression through Vertical Articulation during Lesson Study

    ERIC Educational Resources Information Center

    Suh, Jennifer; Seshaiyer, Padmanabhan

    2015-01-01

    This study examines elementary- and middle-grade teachers' understanding of the mathematical learning progression as they participated in a 6-month professional learning project. Teachers participated in a professional development project that consisted of a 1-week summer content-focused institute with school-based follow-up Lesson Study cycles in…

  6. Lessons from 30 Years of Flight Software

    NASA Technical Reports Server (NTRS)

    McComas, David C.

    2015-01-01

    This presentation takes a brief historical look at flight software over the past 30 years, extracts lessons learned and shows how many of the lessons learned are embodied in the Flight Software product line called the core Flight System (cFS). It also captures the lessons learned from developing and applying the cFS.

  7. OPAL: An Open-Source MPI-IO Library over Cray XT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yu, Weikuan; Vetter, Jeffrey S; Canon, Richard Shane

    Parallel IO over Cray XT is supported by a vendor-supplied MPI-IO package. This package contains a proprietary ADIO implementation built on top of the sysio library. While it is reasonable to maintain a stable code base for application scientists' convenience, it is also very important to the system developers and researchers to analyze and assess the effectiveness of parallel IO software, and accordingly, tune and optimize the MPI-IO implementation. A proprietary parallel IO code base relinquishes such flexibilities. On the other hand, a generic UFS-based MPI-IO implementation is typically used on many Linux-based platforms. We have developed an open-source MPI-IOmore » package over Lustre, referred to as OPAL (OPportunistic and Adaptive MPI-IO Library over Lustre). OPAL provides a single source-code base for MPI-IO over Lustre on Cray XT and Linux platforms. Compared to Cray implementation, OPAL provides a number of good features, including arbitrary specification of striping patterns and Lustre-stripe aligned file domain partitioning. This paper presents the performance comparisons between OPAL and Cray's proprietary implementation. Our evaluation demonstrates that OPAL achieves the performance comparable to the Cray implementation. We also exemplify the benefits of an open source package in revealing the underpinning of the parallel IO performance.« less

  8. Initial impressions from the Northern California 2008 lightning siege: A report by a Wildland Fire Lessons Learned Center Information Collection Team

    Treesearch

    Jonetta T. Holt; David Christenson; Anne Black; Brett Fay; Kim Round

    2009-01-01

    This event in NorCal is another of the major events we have experienced in fire management. In line with our desire to learn, we ought to line up a team to help us capture lessons learned from this event." This statement, and a regional delegation, was the impetus for an information collection team from the Wildland Fire Lessons Learned Center to visit with...

  9. Lessons Learned: An Open Letter to Recreational Therapy Students and Practitioners

    ERIC Educational Resources Information Center

    Austin, David R.

    2010-01-01

    "Lessons Learned" provides a personalized approach and a fresh, bold guide for students and practitioners in recreational therapy. This thought-provoking, inspiring, and accessible text will help the next generation of recreational therapists to find purpose, meaning, and fulfillment in their own lives and to bring health and happiness to their…

  10. Lessons learned on 50,000 acres of plantation in northern California

    Treesearch

    Jeff Webster; Ed Fredrickson

    2005-01-01

    Many lessons have been learned during reforestation of large wildfires and clearcuts in interior Northern California, a region of low rainfall and summer drought typical of a Mediterranean climate. Challenges appeared from time of establishment right up to commercial thinning. Establishment issues included procurement of improved seed, site preparation, soil mitigation...

  11. Microplastics: addressing ecological risk through lessons learned.

    PubMed

    Syberg, Kristian; Khan, Farhan R; Selck, Henriette; Palmqvist, Annemette; Banta, Gary T; Daley, Jennifer; Sano, Larissa; Duhaime, Melissa B

    2015-05-01

    Plastic litter is an environmental problem of great concern. Despite the magnitude of the plastic pollution in our water bodies, only limited scientific understanding is available about the risk to the environment, particularly for microplastics. The apparent magnitude of the problem calls for quickly developing sound scientific guidance on the ecological risks of microplastics. The authors suggest that future research into microplastics risks should be guided by lessons learned from the more advanced and better understood areas of (eco) toxicology of engineered nanoparticles and mixture toxicity. Relevant examples of advances in these two fields are provided to help accelerate the scientific learning curve within the relatively unexplored area of microplastics risk assessment. Finally, the authors advocate an expansion of the "vector effect" hypothesis with regard to microplastics risk to help focus research of microplastics environmental risk at different levels of biological and environmental organization. © 2015 SETAC.

  12. Lessons Learned from Twelve Years of Partnered Tobacco Cessation Research in the Dominican Republic

    PubMed Central

    Ossip, Deborah J.; Diaz, Sergio; Quiñones, Zahira; McIntosh, Scott; Dozier, Ann; Chin, Nancy; Weber, Emily; Holderness, Heather; Torres, Essie; Bautista, Arisleyda; Sanchez, Jose Javier; Avendaño, Esteban; De Ver Dye, Timothy; McDonald, Paul; Bianco, Eduardo

    2017-01-01

    Engaging partners for tobacco control within low and middle income countries (LMICs) at early stages of tobacco control presents both challenges and opportunities in the global effort to avert the one billion premature tobacco caused deaths projected for this century. The Dominican Republic (DR) is one such early stage country. The current paper reports on lessons learned from 12 years of partnered United States (US)-DR tobacco cessation research conducted through two NIH trials (Proyecto Doble T, PDT1 and 2). The projects began with a grassroots approach of working with interested communities to develop and test interventions for cessation and secondhand smoke reduction that could benefit the communities, while concurrently building local capacity and providing resources, data, and models of implementation that could be used to ripple upward to expand partnerships and tobacco intervention efforts nationally. Lessons learned are discussed in four key areas: partnering for research, logistical issues in setting up the research project, disseminating and national networking, and mentoring. Effectively addressing the global tobacco epidemic will require sustained focus on supporting LMIC infrastructures for tobacco control, drawing on lessons learned across partnered trials such as those reported here, to provide feasible and innovative approaches for addressing this modifiable public health crisis. PMID:29104673

  13. Lessons Learned from Twelve Years of Partnered Tobacco Cessation Research in the Dominican Republic.

    PubMed

    Ossip, Deborah J; Diaz, Sergio; Quiñones, Zahira; McIntosh, Scott; Dozier, Ann; Chin, Nancy; Weber, Emily; Holderness, Heather; Torres, Essie; Bautista, Arisleyda; Sanchez, Jose Javier; Avendaño, Esteban; De Ver Dye, Timothy; McDonald, Paul; Bianco, Eduardo

    2016-06-01

    Engaging partners for tobacco control within low and middle income countries (LMICs) at early stages of tobacco control presents both challenges and opportunities in the global effort to avert the one billion premature tobacco caused deaths projected for this century. The Dominican Republic (DR) is one such early stage country. The current paper reports on lessons learned from 12 years of partnered United States (US)-DR tobacco cessation research conducted through two NIH trials (Proyecto Doble T, PDT1 and 2). The projects began with a grassroots approach of working with interested communities to develop and test interventions for cessation and secondhand smoke reduction that could benefit the communities, while concurrently building local capacity and providing resources, data, and models of implementation that could be used to ripple upward to expand partnerships and tobacco intervention efforts nationally. Lessons learned are discussed in four key areas: partnering for research, logistical issues in setting up the research project, disseminating and national networking, and mentoring. Effectively addressing the global tobacco epidemic will require sustained focus on supporting LMIC infrastructures for tobacco control, drawing on lessons learned across partnered trials such as those reported here, to provide feasible and innovative approaches for addressing this modifiable public health crisis.

  14. Research challenges and lessons learned from conducting community-based research with the Hmong community.

    PubMed

    Kue, Jennifer; Thorburn, Sheryl; Keon, Karen Levy

    2015-05-01

    Conducting research with underserved communities with little exposure to research presents a number of challenges and opportunities. Our study used a community-based approach to better understand factors that influence breast and cervical cancer screening among Hmong women. This article shares lessons learned during the process of developing and conducting qualitative research with a Hmong community with limited experience with research. We conducted 17 key informant and 84 in-depth interviews with Hmong women and men. Research team discussions, insights from Hmong research team members, input from our Community Advisory Committee, and project documents were sources of information about the process of conducting research in this community. Lessons learned concern including a cultural insider as an investigator; building community partnerships and support; establishing and working with a community advisory committee; hiring and training bilingual, bicultural staff; and using culturally appropriate materials and methods in a small, kinship-based community. We used multiple strategies to ensure that this study was conducted in a culturally appropriate manner. The lessons learned from our experiences can provide guidance to researchers on methodological and practical issues in conducting research with the Hmong and can inform future research with the Hmong and other similar underserved populations. © 2014 Society for Public Health Education.

  15. Qualification and Lessons Learned with Space Flight Fiber Optic Components

    NASA Technical Reports Server (NTRS)

    Ott, Melanie

    2007-01-01

    This presentation covers lessons learned during the design, development, manufacturing and qualification of space flight fiber optic components. Changes at NASA, including short-term projects and decreased budgets have brought about changes to vendors and parts. Most photonics for NASA needs are now commercial off the shelf (COTS) products. The COTS Tecnology Assurance approach for space flight and qualification plans are outlined.

  16. Lessons learned: wrong intraocular lens.

    PubMed

    Schein, Oliver D; Banta, James T; Chen, Teresa C; Pritzker, Scott; Schachat, Andrew P

    2012-10-01

    To report cases involving the placement of the wrong intraocular lens (IOL) at the time of cataract surgery where human error occurred. Retrospective small case series, convenience sample. Seven surgical cases. Institutional review of errors committed and subsequent improvements to clinical protocols. Lessons learned and changes in procedures adapted. The pathways to a wrong IOL are many but largely reflect some combination of poor surgical team communication, transcription error, lack of preoperative clarity in surgical planning or failure to match the patient, and IOL calculation sheet with 2 unique identifiers. Safety in surgery involving IOLs is enhanced both by strict procedures, such as an IOL-specific "time-out," and the fostering of a surgical team culture in which all members are encouraged to voice questions and concerns. Copyright © 2012 American Academy of Ophthalmology. Published by Elsevier Inc. All rights reserved.

  17. Previous experience in manned space flight: A survey of human factors lessons learned

    NASA Technical Reports Server (NTRS)

    Chandlee, George O.; Woolford, Barbara

    1993-01-01

    Previous experience in manned space flight programs can be used to compile a data base of human factors lessons learned for the purpose of developing aids in the future design of inhabited spacecraft. The objectives are to gather information available from relevant sources, to develop a taxonomy of human factors data, and to produce a data base that can be used in the future for those people involved in the design of manned spacecraft operations. A study is currently underway at the Johnson Space Center with the objective of compiling, classifying, and summarizing relevant human factors data bearing on the lessons learned from previous manned space flights. The research reported defines sources of data, methods for collection, and proposes a classification for human factors data that may be a model for other human factors disciplines.

  18. Global Consultation Processes: Lessons Learned from Refugee Teacher Consultation Research in Malaysia

    ERIC Educational Resources Information Center

    O'Neal, Colleen R.; Gosnell, Nicole M.; Ng, Wai Sheng; Clement, Jennifer; Ong, Edward

    2018-01-01

    The process of global consultation has received little attention despite its potential for promoting international mutual understanding with marginalized communities. This article details theory, entry, implementation, and evaluation processes for global consultation research, including lessons learned from our refugee teacher intervention. The…

  19. The art and science of data curation: Lessons learned from constructing a virtual collection

    NASA Astrophysics Data System (ADS)

    Bugbee, Kaylin; Ramachandran, Rahul; Maskey, Manil; Gatlin, Patrick

    2018-03-01

    A digital, or virtual, collection is a value added service developed by libraries that curates information and resources around a topic, theme or organization. Adoption of the virtual collection concept as an Earth science data service improves the discoverability, accessibility and usability of data both within individual data centers but also across data centers and disciplines. In this paper, we introduce a methodology for systematically and rigorously curating Earth science data and information into a cohesive virtual collection. This methodology builds on the geocuration model of searching, selecting and synthesizing Earth science data, metadata and other information into a single and useful collection. We present our experiences curating a virtual collection for one of NASA's twelve Distributed Active Archive Centers (DAACs), the Global Hydrology Resource Center (GHRC), and describe lessons learned as a result of this curation effort. We also provide recommendations and best practices for data centers and data providers who wish to curate virtual collections for the Earth sciences.

  20. EMU Lessons Learned Database

    NASA Technical Reports Server (NTRS)

    Matthews, Kevin M., Jr.; Crocker, Lori; Cupples, J. Scott

    2011-01-01

    As manned space exploration takes on the task of traveling beyond low Earth orbit, many problems arise that must be solved in order to make the journey possible. One major task is protecting humans from the harsh space environment. The current method of protecting astronauts during Extravehicular Activity (EVA) is through use of the specially designed Extravehicular Mobility Unit (EMU). As more rigorous EVA conditions need to be endured at new destinations, the suit will need to be tailored and improved in order to accommodate the astronaut. The Objective behind the EMU Lessons Learned Database(LLD) is to be able to create a tool which will assist in the development of next-generation EMUs, along with maintenance and improvement of the current EMU, by compiling data from Failure Investigation and Analysis Reports (FIARs) which have information on past suit failures. FIARs use a system of codes that give more information on the aspects of the failure, but if one is unfamiliar with the EMU they will be unable to decipher the information. A goal of the EMU LLD is to not only compile the information, but to present it in a user-friendly, organized, searchable database accessible to all familiarity levels with the EMU; both newcomers and veterans alike. The EMU LLD originally started as an Excel database, which allowed easy navigation and analysis of the data through pivot charts. Creating an entry requires access to the Problem Reporting And Corrective Action database (PRACA), which contains the original FIAR data for all hardware. FIAR data are then transferred to, defined, and formatted in the LLD. Work is being done to create a web-based version of the LLD in order to increase accessibility to all of Johnson Space Center (JSC), which includes converting entries from Excel to the HTML format. FIARs related to the EMU have been completed in the Excel version, and now focus has shifted to expanding FIAR data in the LLD to include EVA tools and support hardware such as

  1. Implementing Telerehabilitation Research for Stroke Rehabilitation with Community Dwelling Veterans: Lessons Learned

    PubMed Central

    Chumbler, Neale R.; Quigley, Patricia; Sanford, Jon; Griffiths, Patricia; Rose, Dorian; Morey, Miriam; Ely, E. Wesley; Hoenig, Helen

    2010-01-01

    Telerehabilitation (TR) is the use of telehealth technologies to provide distant support, rehabilitation services, and information exchange between people with disabilities and their clinical providers. This article discusses the barriers experienced when implementing a TR multi-site randomized controlled trial for stroke patients in their homes, and the lessons learned. The barriers are divided into two sections: those specific to TR and those pertinent to the conduct of tele-research. The TR specific barriers included the rapidly changing telecommunications and health care environment and inconsistent equipment functionality. The barriers applicable to tele-research included the need to meet regulations in diverse departments and rapidly changing research regulations. Lessons learned included the need for: telehealth equipment options to allow for functionality within a diverse telecommunications infrastructure; rigorous pilot testing of all equipment in authentic situations; and on-call and on-site biomedical engineering and/or IT staff. PMID:25945169

  2. LESSONS LEARNED AND NEXT STEPS FOR BUILDING KNOWLEDGE ABOUT TRIBAL MATERNAL, INFANT, AND EARLY CHILDHOOD HOME VISITING.

    PubMed

    Whitmore, Corrie B; Sarche, Michelle; Ferron, Cathy; Moritsugu, John; Sanchez, Jenae G

    2018-05-16

    Authors in this Special Issue of the Infant Mental Health Journal shared the work of the first three cohorts of Tribal Maternal, Infant, and Early Childhood Home Visiting (MIECHV) grantees funded by the Administration for Children and Families. Since 2010, Tribal MIECHV grantees have served families and children prenatally to kindergarten entry in American Indian and Alaska Native (AI/AN) communities across the lower 48 United States and Alaska. Articles highlighted challenges and opportunities that arose as grantees adapted, enhanced, implemented, and evaluated their home-visiting models. This article summarizes nine lessons learned across the articles in this Special Issue. Lessons learned address the importance of strengths-based approaches, relationship-building, tribal community stakeholder involvement, capacity-building, alignment of resources and expectations, tribal values, adaptation to increase cultural and contextual attunement, indigenous ways of knowing, community voice, and sustainability. Next steps in Tribal MIECHV are discussed in light of these lessons learned. © 2018 Michigan Association for Infant Mental Health.

  3. Hand Gesture and Mathematics Learning: Lessons From an Avatar.

    PubMed

    Cook, Susan Wagner; Friedman, Howard S; Duggan, Katherine A; Cui, Jian; Popescu, Voicu

    2017-03-01

    A beneficial effect of gesture on learning has been demonstrated in multiple domains, including mathematics, science, and foreign language vocabulary. However, because gesture is known to co-vary with other non-verbal behaviors, including eye gaze and prosody along with face, lip, and body movements, it is possible the beneficial effect of gesture is instead attributable to these other behaviors. We used a computer-generated animated pedagogical agent to control both verbal and non-verbal behavior. Children viewed lessons on mathematical equivalence in which an avatar either gestured or did not gesture, while eye gaze, head position, and lip movements remained identical across gesture conditions. Children who observed the gesturing avatar learned more, and they solved problems more quickly. Moreover, those children who learned were more likely to transfer and generalize their knowledge. These findings provide converging evidence that gesture facilitates math learning, and they reveal the potential for using technology to study non-verbal behavior in controlled experiments. Copyright © 2016 Cognitive Science Society, Inc.

  4. Lessons Learned from an Industry, Government and University Collaboration to Restore Stream Habitats and Mitigate Effects

    NASA Astrophysics Data System (ADS)

    Jones, Nicholas E.; Scrimgeour, Garry J.; Tonn, William M.

    2017-01-01

    Restoration ecologists conduct both basic and applied research using a diversity of funding and collaborative models. Over the last 17 years we have assessed the effectiveness of a stream compensation project in Canada's north, where an independent university-based research program was a condition of the regulatory approval process. This resulted in a non-traditional university-government-industry partnership. Here we share seven lessons that we learned from our collective experiences with the research partnership and use the Ekati diamond mine as a case study to illustrate and support lessons learned. Our advice includes opinions on the importance of: engaging collaborators early, defining roles and responsibilities, data sharing and standardization, the use of natural streams to set restoration targets, expect setbacks and surprises, treating restoration as an opportunity to experiment, and how to define success. Many of the lessons learned are broadly applicable to those whom embark on research collaborations among industry, universities, and consulting companies within a regulatory framework and may be of particular value to collaborators in early stages of their career.

  5. Lesson Study: Evaluation Report and Executive Summary

    ERIC Educational Resources Information Center

    Murphy, Richard; Weinhardt, Felix; Wyness, Gill; Rolfe, Heather

    2017-01-01

    Lesson Study is a popular approach to teacher professional development used widely in Japan. It involves a small group of teachers co-planning a series of lessons based on a shared learning goal for the pupils, with one teacher leading the co-constructed lesson and their colleagues invited to observe pupil learning in the lesson. The team then…

  6. Lessons Learned from Migrating to an Online Electronic Business Management Course

    ERIC Educational Resources Information Center

    Walstrom, Kent A.

    2014-01-01

    This article describes the lessons learned while migrating an Electronic Business Management course from traditional face-to-face delivery to online delivery across a six and a half year time frame. The course under review teaches students how to develop and construct a working information-based online business using free versions of online…

  7. Patient and Stakeholder Engagement in the PCORI Pilot Projects: Description and Lessons Learned.

    PubMed

    Forsythe, Laura P; Ellis, Lauren E; Edmundson, Lauren; Sabharwal, Raj; Rein, Alison; Konopka, Kristen; Frank, Lori

    2016-01-01

    Patients and healthcare stakeholders are increasingly becoming engaged in the planning and conduct of biomedical research. However, limited research characterizes this process or its impact. We aimed to characterize patient and stakeholder engagement in the 50 Pilot Projects funded by the Patient-Centered Outcomes Research Institute (PCORI), and identify early contributions and lessons learned. A self-report instrument was completed by researchers between 6 and 12 months following project initiation. Forty-seven principal investigators or their designees (94 % response rate) participated in the study. MAIN MEASURES Self-report of types of stakeholders engaged, stages and levels of engagement, facilitators and barriers to engagement, lessons learned, and contributions from engagement were measured. Most (83 %) reported engaging more than one stakeholder in their project. Among those, the most commonly reported groups were patients (90 %), clinicians (87 %), health system representatives (44 %), caregivers (41 %), and advocacy organizations (41 %). Stakeholders were commonly involved in topic solicitation, question development, study design, and data collection. Many projects engaged stakeholders in data analysis, results interpretation, and dissemination. Commonly reported contributions included changes to project methods, outcomes or goals; improvement of measurement tools; and interpretation of qualitative data. Investigators often identified communication and shared leadership strategies as "critically important" facilitators (53 and 44 % respectively); lack of stakeholder time was the most commonly reported challenge (46 %). Most challenges were only partially resolved. Early lessons learned included the importance of continuous and genuine partnerships, strategic selection of stakeholders, and accommodation of stakeholders' practical needs. PCORI Pilot Projects investigators report engaging a variety of stakeholders across many stages of research, with specific

  8. Cumulative risk assessment lessons learned: a review of case studies and issue papers.

    PubMed

    Gallagher, Sarah S; Rice, Glenn E; Scarano, Louis J; Teuschler, Linda K; Bollweg, George; Martin, Lawrence

    2015-02-01

    Cumulative risk assessments (CRAs) examine potential risks posed by exposure to multiple and sometimes disparate environmental stressors. CRAs are more resource intensive than single chemical assessments, and pose additional challenges and sources of uncertainty. CRAs may examine the impact of several factors on risk, including exposure magnitude and timing, chemical mixture composition, as well as physical, biological, or psychosocial stressors. CRAs are meant to increase the relevance of risk assessments, providing decision makers with information based on real world exposure scenarios that improve the characterization of actual risks and hazards. The U.S. Environmental Protection Agency has evaluated a number of CRAs, performed by or commissioned for the Agency, to seek insight into CRA concepts, methods, and lessons learned. In this article, ten case studies and five issue papers on key CRA topics are examined and a set of lessons learned are identified for CRA implementation. The lessons address the iterative nature of CRAs, importance of considering vulnerability, need for stakeholder engagement, value of a tiered approach, new methods to assess multiroute exposures to chemical mixtures, and the impact of geographical scale on approach and purpose. Copyright © 2014 Elsevier Ltd. All rights reserved.

  9. Lessons learned in applying ecosystem goods and services to community decision making

    EPA Science Inventory

    This report is intended to describe lessons learned from the application of FEGS-based research in a series of PBS conducted by EPA’s Office of Research and Development (ORD) and make this information available and useful for planning future research into local decision sup...

  10. Lcross Lunar Impactor - Lessons Learned from a Small Satellite Mission

    NASA Technical Reports Server (NTRS)

    Andrews, Daniel

    2010-01-01

    The Lunar CRater Observation and Sensing Satellite (LCROSS) launched with the Lunar Reconnaissance Orbiter (LRO) on June 18, 2009. While the science purpose of the LCROSS mission was to determine the presence of water-ice in a permanently-shadowed crater on the moon, the functional purpose was to be a pioneer for future low-cost, risk-tolerant small satellite NASA missions. Recent strategic changes at the Agency level have only furthered the importance of small satellite missions. NASA Ames Research Center and its industry partner, Northrop-Grumman, initiated this spacecraft project two-years after its co-manifest mission had started, with less than one-fifth the budget. With a $79M total cost cap (including operations and reserves) and 31-months until launch, LCROSS needed a game-changing approach to be successful. At the LCROSS Confirmation Review, the ESMD Associate Administrator asked the Project team to keep a close record of lessons learned through the course of the mission and share their findings with the Agency at the end of the mission. This paper summarizes the Project, the mission, its risk position, and some of the more notable lessons learned.

  11. LCROSS Lunar Impactor - Lessons Learned from a Small Satellite Mission

    NASA Technical Reports Server (NTRS)

    Andrews, Daniel R.

    2010-01-01

    The Lunar CRater Observation and Sensing Satellite (LCROSS) launched with the Lunar Reconnaissance Orbiter (LRO) on June 18, 2009. While the science function of the LCROSS mission was to determine the presence of water-ice in a permanently-shadowed crater on the moon, the operational purpose was to be a pioneer for future low-cost, risk-tolerant small satellite NASA missions. Recent strategic changes at the Agency level have only furthered the importance of small satellite missions. NASA Ames Research Center and its industry partner, Northrop-Grumman, initiated this spacecraft project two-years after its co-manifest mission had started, with less than one-fifth the budget. With a $79M total cost cap (including operations and reserves) and 31-months until launch, LCROSS needed a game-changing approach to be successful. At the LCROSS Confirmation Review, the ESMD Associate Administrator asked the Project team to keep a close record of lessons learned through the course of the mission and share their findings with the Agency at the end of the mission. This paper summarizes the Project, the mission, its risk position, and some of the more notable lessons learned.

  12. Habitability and Human Factors: Lessons Learned in Long Duration Space Flight

    NASA Technical Reports Server (NTRS)

    Baggerman, Susan D.; Rando, Cynthia M.; Duvall, Laura E.

    2006-01-01

    This study documents the investigation of qualitative habitability and human factors feedback provided by scientists, engineers, and crewmembers on lessons learned from the ISS Program. A thorough review and understanding of this data is critical in charting NASA's future path in space exploration. NASA has been involved in ensuring that the needs of crewmembers to live and work safely and effectively in space have been met throughout the ISS Program. Human factors and habitability data has been collected from every U.S. crewmember that has resided on the ISS. The knowledge gained from both the developers and inhabitants of the ISS have provided a significant resource of information for NASA and will be used in future space exploration. The recurring issues have been tracked and documented; the top 5 most critical issues have been identified from this data. The top 5 identified problems were: excessive onsrbit stowage; environment; communication; procedures; and inadequate design of systems and equipment. Lessons learned from these issues will be used to aid in future improvements and developments to the space program. Full analysis of the habitability and human factors data has led to the following recommendations. It is critical for human factors to be involved early in the design of space vehicles and hardware. Human factors requirements need to be readdressed and redefined given the knowledge gained during previous ISS and long-duration space flight programs. These requirements must be integrated into vehicle and hardware technical documentation and consistently enforced. Lastly, space vehicles and hardware must be designed with primary focus on the user/operator to successfully complete missions and maintain a safe working environment. Implementation of these lessons learned will significantly improve NASA's likelihood of success in future space endeavors.

  13. Lessons Learned from a Community Engagement Initiative within Irish Higher Education

    ERIC Educational Resources Information Center

    Quillinan, Bernie; McEvoy, Eileen; MacPhail, Ann; Dempsey, Ciara

    2018-01-01

    This paper focuses on a community-university partnership built around a programme of study co-created by residents of a disadvantaged community and situated, for the most part, within that community. The aim of this paper is to share lessons learned from this community engagement initiative, as identified through a research study which ran…

  14. Noncombatant Evacuation Operations: Department of State’s Lessons Learned Program

    DTIC Science & Technology

    2016-06-10

    student author and do not necessarily represent the views of the U.S. Army Command and General Staff College or any other U.S. governmental agency...68 viii ACRONYMS AAR After Action Review CALL Center for Army Lessons Learned CMS Crisis Management Support CMU Crisis Management ...Knowledge Management Chart .......................................................................25 Figure 5. Organization Chart

  15. MILSTAR's flexible substrate solar array: Lessons learned, addendum

    NASA Technical Reports Server (NTRS)

    Gibb, John

    1990-01-01

    MILSTAR's Flexible Substrate Solar Array (FSSA) is an evolutionary development of the lightweight, flexible substrate design pioneered at Lockheed during the seventies. Many of the features of the design are related to the Solar Array Flight Experiment (SAFE), flown on STS-41D in 1984. FSSA development has created a substantial technology base for future flexible substrate solar arrays such as the array for the Space Station Freedom. Lessons learned during the development of the FSSA can and should be applied to the Freedom array and other future flexible substrate designs.

  16. Lessons Learned from Radioactive Waste Storage and Disposal Facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Esh, David W.; Bradford, Anna H.

    2008-01-15

    The safety of radioactive waste disposal facilities and the decommissioning of complex sites may be predicated on the performance of engineered and natural barriers. For assessing the safety of a waste disposal facility or a decommissioned site, a performance assessment or similar analysis is often completed. The analysis is typically based on a site conceptual model that is developed from site characterization information, observations, and, in many cases, expert judgment. Because waste disposal facilities are sited, constructed, monitored, and maintained, a fair amount of data has been generated at a variety of sites in a variety of natural systems. Thismore » paper provides select examples of lessons learned from the observations developed from the monitoring of various radioactive waste facilities (storage and disposal), and discusses the implications for modeling of future waste disposal facilities that are yet to be constructed or for the development of dose assessments for the release of decommissioning sites. Monitoring has been and continues to be performed at a variety of different facilities for the disposal of radioactive waste. These include facilities for the disposal of commercial low-level waste (LLW), reprocessing wastes, and uranium mill tailings. Many of the lessons learned and problems encountered provide a unique opportunity to improve future designs of waste disposal facilities, to improve dose modeling for decommissioning sites, and to be proactive in identifying future problems. Typically, an initial conceptual model was developed and the siting and design of the disposal facility was based on the conceptual model. After facility construction and operation, monitoring data was collected and evaluated. In many cases the monitoring data did not comport with the original site conceptual model, leading to additional investigation and changes to the site conceptual model and modifications to the design of the facility. The following cases are

  17. ISS Training Best Practices and Lessons Learned

    NASA Technical Reports Server (NTRS)

    Barshi, Immanuel; Dempsey, Donna L.

    2017-01-01

    Training our crew members for long duration exploration-class missions (LDEM) will have to be qualitatively and quantitatively different from current training practices. However, there is much to be learned from the extensive experience NASA has gained in training crew members for missions on board the International Space Station (ISS). Furthermore, the operational experience on board the ISS provides valuable feedback concerning training effectiveness. Keeping in mind the vast differences between current ISS crew training and training for LDEM, the needs of future crew members, and the demands of future missions, this ongoing study seeks to document current training practices and lessons learned. The goal of the study is to provide input to the design of future crew training that takes as much advantage as possible of what has already been learned and avoids as much as possible past inefficiencies. Results from this study will be presented upon its completion. By researching established training principles, examining future needs, and by using current practices in spaceflight training as test beds, this research project is mitigating program risks and generating templates and requirements to meet future training needs.

  18. ISS Training Best Practices and Lessons Learned

    NASA Technical Reports Server (NTRS)

    Dempsey, Donna L.; Barshi, Immanuel

    2018-01-01

    Training our crew members for long-duration Deep Space Transport (DST) missions will have to be qualitatively and quantitatively different from current training practices. However, there is much to be learned from the extensive experience NASA has gained in training crew members for missions on board the International Space Station (ISS). Furthermore, the operational experience on board the ISS provides valuable feedback concerning training effectiveness. Keeping in mind the vast differences between current ISS crew training and training for DST missions, the needs of future crew members, and the demands of future missions, this ongoing study seeks to document current training practices and lessons learned. The goal of the study is to provide input to the design of future crew training that takes as much advantage as possible of what has already been learned and avoids as much as possible past inefficiencies. Results from this study will be presented upon its completion. By researching established training principles, examining future needs, and by using current practices in spaceflight training as test beds, this research project is mitigating program risks and generating templates and requirements to meet future training needs.

  19. Integrating TeamSTEPPS® into ambulatory reproductive health care: Early successes and lessons learned.

    PubMed

    Paul, Maureen E; Dodge, Laura E; Intondi, Evelyn; Ozcelik, Guzey; Plitt, Ken; Hacker, Michele R

    2017-04-01

    Most medical teamwork improvement interventions have occurred in hospitals, and more efforts are needed to integrate them into ambulatory care settings. In 2014, Affiliates Risk Management Services, Inc. (ARMS), the risk management services organization for a large network of reproductive health care organizations in the United States, launched a voluntary 5-year initiative to implement a medical teamwork system in this network using the TeamSTEPPS model. This article describes the ARMS initiative and progress made during the first 2 years, including lessons learned. The ARMS TeamSTEPPS program consists of the following components: preparation of participating organizations, TeamSTEPPS master training, implementation of teamwork improvement programs, and evaluation. We used self-administered questionnaires to assess satisfaction with the ARMS program and with the master training course. In the first 2 years, 20 organizations enrolled. Participants found the preparation phase valuable and were highly satisfied with the master training course. Although most attendees felt that the course imparted the knowledge and tools critical for TeamSTEPPS implementation, they identified time restraints and competing initiatives as potential barriers. The project team has learned valuable lessons about obtaining buy-in, consolidating the change teams, making the curriculum relevant, and evaluation. Ambulatory care settings require innovative approaches to integration of teamwork improvement systems. Evaluating and sharing lessons learned will help to hone best practices as we navigate this new frontier in the field of patient safety. © 2017 American Society for Healthcare Risk Management of the American Hospital Association.

  20. Enriching Formal Language Learning with an Informal Social Component

    ERIC Educational Resources Information Center

    Dettori, Giuliana; Torsani, Simone

    2013-01-01

    This paper describes an informal component that we added to an online formal language learning environment in order to help the learners reach relevant Internet pages they can freely use to complement their learning activity. Thanks to this facility, each lesson is enriched, at run time, with a number of links automatically retrieved from social…

  1. Store Separation Lessons Learned During the Last 30 Years

    DTIC Science & Technology

    2010-01-01

    the same time period the Influence Function Method (IFM) was also developed5. This method allowed for a straight STORE SEPARATION LESSONS LEARNED...developed at Grumman under an Air Force contract. The Influence Function Method (IFM)5,6,7 was used to determine the effect of the aircraft flowfield on...A Chimera Grid Scheme,” Advances in Grid Generation, ASME, June 1983. 5. Meyer, R., Cenko, A., and Yaros, S., “An Influence Function Method for

  2. Mobile clinics in Haiti, part 2: Lessons learned through service.

    PubMed

    Haley, Janice M; Cone, Pamela H

    2016-11-01

    Learning from experience is a positive approach when preparing for mobile clinic service in a developing country. Mobile clinics provide healthcare services to people in hard to reach areas around the world, but preparation for their use needs to be done in collaboration with local leaders and healthcare providers. For over 16 years, Azusa Pacific University School of Nursing has sponsored mobile clinics to rural northern Haiti with the aim to provide culturally sensitive healthcare in collaboration with Haitian leaders. Past Haiti mobile clinic experiences have informed the APU-SON approach on best practices in study abroad, service-learning, and mission trips providing healthcare services. Hopefully, lessons learned from these experiences with mobile clinic service-learning opportunities in Haiti will benefit others who seek to plan study abroad service-learning trips for students in healthcare majors who desire to serve the underserved around the world. Copyright © 2016 Elsevier Ltd. All rights reserved.

  3. Using CBPR for Health Research in American Muslim Mosque Communities: Lessons Learned

    PubMed Central

    Killawi, Amal; Heisler, Michele; Hamid, Hamada; Padela, Aasim I.

    2015-01-01

    Background American Muslims are understudied in health research, and there are few studies documenting community-based participatory research (CBPR) efforts among American Muslim mosque communities. Objectives We highlight lessons learned from a CBPR partnership that explored the health care beliefs, behaviors, and challenges of American Muslims. Methods We established a collaboration between the University of Michigan and four Muslim-focused community organizations in Michigan. Our collaborative team designed and implemented a two-phase study involving interviews with community stakeholders and focus groups and surveys with mosque congregants. Lessons Learned Although we were successful in meeting our research goals, maintaining community partner involvement and sustaining the project partnership proved challenging. Conclusions CBPR initiatives within mosque communities have the potential for improving community health. Our experience suggests that successful research partnerships with American Muslims will utilize social networks and cultural insiders, culturally adapt research methods, and develop a research platform within the organizational infrastructures of the American Muslim community. PMID:25981426

  4. Research lessons learned: occupational therapy with culturally diverse mothers of premature infants.

    PubMed

    Reid, Denise T; Chiu, Teresa M L

    2011-06-01

    Evaluation studies of the effectiveness of home-based occupational therapy are scarce but are needed to justify the impact of occupational therapy intervention. When the intervention is for persons from diverse cultural backgrounds, additional research challenges arise. To share lessons learned in conducting home-based occupational therapy research with Canadian, and immigrant South Asian and Chinese mothers of premature infants in a large Canadian city. Lessons learned were to implement a culturally sensitive recruitment process, change the research design to include more interviews and focus groups, and be aware of the need for culturally appropriate instruments. Researchers need to be sensitized to the Western cultural values upon which most research designs and instrumentation are constructed. Involvement of a culturally diverse research team, openness to feedback, adaptability, and critical reflection on what is important to the cultural groups are among the suggestions for researchers planning home-based occupational therapy research with culturally diverse populations.

  5. Lessons Learned from the Clementine Mission

    NASA Technical Reports Server (NTRS)

    1997-01-01

    According to BMDO, the Clementine mission achieved many of its technology objectives during its flight to the Moon in early 1994 but, because of a software error, was unable to test the autonomous tracking of a cold target. The preliminary analyses of the returned lunar data suggest that valuable scientific measurements were made on several important topics but that COMPLEX's highest-priority objectives for lunar science were not achieved. This is not surprising given that the rationale for Clementine was technological rather than scientific. COMPLEX lists below a few of the lessons that may be learned from Clementine. Although the Clementine mission was not conceived as a NASA science mission exactly like those planned for the Discovery program, many operational aspects of the two are similar. It is therefore worthwhile to understand the strengths and faults of the Clementine approach. Some elements of the Clementine operation that led to the mission's success include the following: (1) The mission's achievements were the responsibility of a single organization and its manager, which made that organization and that individual accountable for the final outcome; (2) The sponsor adopted a hands-off approach and set a minimum number of reviews (three); (3) The sponsor accepted a reasonable amount of risk and allowed the project team to make the trade-offs necessary to minimize the mission's risks while still accomplishing all its primary objectives; and (4) The development schedule was brief and the agreed-on funding (and funding profile) was adhered to. Among the operational shortcomings of Clementine were the following: (1) An overly ambitious schedule and a slightly lean budget (meaning insufficient time for software development and testing, and leading ultimately to human exhaustion); and (2) No support for data calibration, reduction, and analysis. The principal lesson to be learned in this category is that any benefits from the constructive application of higher

  6. Near-Range Receiver Unit of Next Generation PollyXT Used with Koldeway Aerosol Raman Lidar in Arctic

    NASA Astrophysics Data System (ADS)

    Stachlewska, Iwona S.; Markowicz, Krzysztof M.; Ritter, Christoph; Neuber, Roland; Heese, Birgit; Engelmann, Ronny; Linne, Holger

    2016-06-01

    The Near-range Aerosol Raman lidar (NARLa) receiver unit, that was designed to enhance the detection range of the NeXT generation PollyXT Aerosol-Depolarization-Raman (ADR) lidar of the University of Warsaw, was employed next the Koldeway Aerosol Raman Lidar (KARL) at the AWI-IPEV German-French station in Arctic during Spring 2015. Here we introduce shortly design of both lidars, the scheme of their installation next to each other, and preliminary results of observations aiming at arctic haze investigation by the lidars and the iCAP a set of particle counter and aethalometer installed under a tethered balloon.

  7. Lessons learned and their application to program development and cultural issues

    NASA Technical Reports Server (NTRS)

    Roth, Gilbert L.

    1991-01-01

    The knowledge used today is contained in an untold number of technical and managerial handbooks. This knowledge is derived from the known strengths and weaknesses experienced during the execution of programs and projects that are being used today. The purpose is to stir up thought, not on specific experiences, but on implementation of lessons learned from these experiences.

  8. The Value Simulation-Based Learning Added to Machining Technology in Singapore

    ERIC Educational Resources Information Center

    Fang, Linda; Tan, Hock Soon; Thwin, Mya Mya; Tan, Kim Cheng; Koh, Caroline

    2011-01-01

    This study seeks to understand the value simulation-based learning (SBL) added to the learning of Machining Technology in a 15-week core subject course offered to university students. The research questions were: (1) How did SBL enhance classroom learning? (2) How did SBL help participants in their test? (3) How did SBL prepare participants for…

  9. Big Missiles and Big Decks: The Viability of Aircraft Carriers in an A2/AD World

    DTIC Science & Technology

    2016-06-01

    RESEARCH DESIGN This thesis centers on a historical case study of two periods in which the United States and its carrier fleet faced some degree...19 3. Lessons Learned ...........................................................................21 C. APPLICABILITY OF CASE STUDIES ...employed the strategic concepts behind A2/AD since the Persian War of 480 BC. In his analysis of several historic case studies , Tangredi notes that a

  10. Lessons learned from public health campaigns and applied to anti-DWI norms development

    DOT National Transportation Integrated Search

    1995-05-01

    The purpose of this study was to examine norms development in past public health campaigns to direct lessons learned from those efforts to future anti-DNN'l programming. Three campaigns were selected for a multiple case study. The anti-smoking, anti-...

  11. Buyer Beware: Lessons Learned from EdTPA Implementation in New York State

    ERIC Educational Resources Information Center

    Greenblatt, Deborah; O'Hara, Kate E.

    2015-01-01

    As states across the country continue their implementation of the Teacher Performance Assessment Portfolio (edTPA), a complex and high-stakes certification requirement for teacher certification, there are important lessons for educators and education advocates to learn from New York State's implementation. As Linda Darling-Hammond, developer and…

  12. Making Interdisciplinary Collaboration Work: Key Ideas, a Case Study and Lessons Learned

    ERIC Educational Resources Information Center

    McMurtry, Angus; Clarkin, Chantalle; Bangou, Francis; Duplaa, Emmanuel; MacDonald, Colla; Ng-A-Fook, Nicholas; Trumpower, David

    2012-01-01

    This article discusses the "lessons learned" from an attempt to establish an interdisciplinary education research group. The growth, development and dissolution of the group are treated as an instrumental case study. Current literature on interdisciplinary collaboration is synthesized in order to provide a frame for analysis. Data was collected…

  13. Lessons learned from KSC processing on STS science, applications, and commercial payloads

    NASA Technical Reports Server (NTRS)

    Williams, W. E.; Ragusa, J. M.

    1984-01-01

    The present investigation is concerned with an evaluation of the lessons learned in connection with the flights of the Shuttle orbiters Columbia, Challenger, and Discovery. A description is provided of several general and specific lessons related to the processing of free-flying and attached payloads. John F. Kennedy Space Center (KSC), as the prime launch and landing site, is responsible for managing all payload-to-payload, payload-to-simulated orbiter, and payload-to-orbiter operations. For each payload, a KSC Launch Site Support Manager (LSSM) is named as the primary point of contact for the customer. Attention is given to aspects of planning interaction, payload types, and problems of ground processing. The discussed lessons are partly related to the value of early contact between customers and KSC representatives, the primary point of contact, the launch site support plan, and the importance of customer participation.

  14. Automatic Dance Lesson Generation

    ERIC Educational Resources Information Center

    Yang, Yang; Leung, H.; Yue, Lihua; Deng, LiQun

    2012-01-01

    In this paper, an automatic lesson generation system is presented which is suitable in a learning-by-mimicking scenario where the learning objects can be represented as multiattribute time series data. The dance is used as an example in this paper to illustrate the idea. Given a dance motion sequence as the input, the proposed lesson generation…

  15. Bayes, Bugs, and Bioterrorists: Lessons Learned from the Anthrax Attacks

    DTIC Science & Technology

    2005-04-01

    characteristics of Bacillus anthracis, the causative organism. Anthrax was known primarily as a disease of cattle, sheep, and other types of livestock, but it...REPORT TYPE N/A 3. DATES COVERED - 4. TITLE AND SUBTITLE Bayes, Bugs, and Bioterrorists: Lessons Learned from the Anthrax Attacks 5a. CONTRACT...develop a strategy for managing the risks of bioterrorism. Using this type of approach, the government can better characterize the costs, risks and

  16. Fifteen Years of Chandra Operation: Scientific Highlights and Lessons Learned

    NASA Technical Reports Server (NTRS)

    Weisskopf, Martin C.

    2014-01-01

    NASA's Chandra X-Ray Observatory, designed for three years of operation with a goal of five years is now entering its 15-th year of operation. Thanks to its superb angular resolution, the Observatory continues to yield new and exciting results, many of which were totally unanticipated prior to launch. We will review some scientific highlights and present "lessons learned" from the experience of operating this great observatory.

  17. CloudSat Anomaly and Return to the A-Train: Lessons Learned for Satellite Constellations

    NASA Technical Reports Server (NTRS)

    Vane, Deborah

    2015-01-01

    In April 2011, CloudSat suffered a severe battery anomaly, leaving the space-craft in emergency mode without the ability to command or maneuver the spacecraft. Before the team was able to recover spacecraft operability, CloudSat passed close to the Aqua satellite in the A-Train and then exited the A-Train. A new mode of operations, termed Daylight Only Operations (DO-Op) mode was developed to enable CloudSat to resume science operations in an orbit under the A-Train by November 2011, and in July 2012 CloudSat re-entered the A-Train. This paper describes challenges and lessons-learned during the anomaly, the exit from the A-Train and the return to the A-Train. These lessons-learned may ap-ply to other current and future satellite constellations in Earth orbit.

  18. Unintended knowledge learnt in primary science practical lessons

    NASA Astrophysics Data System (ADS)

    Park, Jisun; Abrahams, Ian; Song, Jinwoong

    2016-11-01

    This study explored the different kinds of unintended learning in primary school practical science lessons. In this study, unintended learning has been defined as student learning that was found to occur that was not included in the teachers learning objectives for that specific lesson. A total of 22 lessons, taught by five teachers in Korean primary schools with 10- to 12-year-old students, were audio-and video recorded. Pre-lesson interviews with the teachers were conducted to ascertain their intended learning objectives. Students were asked to write short memos after the lesson about what they learnt. Post-lesson interviews with students and teachers were undertaken. What emerged was that there were three types of knowledge that students learnt unintentionally: factual knowledge gained by phenomenon-based reasoning, conceptual knowledge gained by relation- or model-based reasoning, and procedural knowledge acquired by practice. Most unintended learning found in this study fell into the factual knowledge and only a few cases of conceptual knowledge were found. Cases of both explicit procedural knowledge and implicit procedural knowledge were found. This study is significant in that it suggests how unintended learning in practical work can be facilitated as an educative opportunity for meaningful learning by exploring what and how students learnt.

  19. XML technology planning database : lessons learned

    NASA Technical Reports Server (NTRS)

    Some, Raphael R.; Neff, Jon M.

    2005-01-01

    A hierarchical Extensible Markup Language(XML) database called XCALIBR (XML Analysis LIBRary) has been developed by Millennium Program to assist in technology investment (ROI) analysis and technology Language Capability the New return on portfolio optimization. The database contains mission requirements and technology capabilities, which are related by use of an XML dictionary. The XML dictionary codifies a standardized taxonomy for space missions, systems, subsystems and technologies. In addition to being used for ROI analysis, the database is being examined for use in project planning, tracking and documentation. During the past year, the database has moved from development into alpha testing. This paper describes the lessons learned during construction and testing of the prototype database and the motivation for moving from an XML taxonomy to a standard XML-based ontology.

  20. Attitude symbology for helmet-mounted displays: lessons learned

    NASA Astrophysics Data System (ADS)

    Drewery, Chris C.; Davy, Eleanor C.; Dudfield, Helen J.

    1997-06-01

    This paper will review recent research on attitude symbology on helmet-mounted displays (HMDs) for the air-to-ground mission. General issues concerned with HMDs will be discussed and the lessons learned during the research will be outlined. It is suggested that a sound development approach to HMD symbology is critical since such symbology will constantly follow the pilot's line of sight (LOS). Further, the HMD field-of-view (FOV) is likely to be limited. Hence, if HMDs are to be used operationally for more than weapon aiming a number of human factors issues need to be investigated, such as the optimal method of presenting attitude information. The pitch ladder was designed to be presented along the boresight, directly in the pilot's LOS, at a fixed frame of reference. As pilots are used to and have been trained upon attitude information presented in consistency with the forward LOS, information representative of the pitch ladder may be beneficial on HMDs. None the less, since the pitch ladder was not designed for the HMD, novel formats may be more appropriate. As with all novel attitude symbology, enhanced operational performance must always be demonstrated and substantiated against the conventional existing symbology. Several experiments will be described which compared the pitch ladder to novel symbology, namely: the cylinder display; the arc segmented attitude reference display; and the modified roll-pitch display. These experiments were conducted using a variety of operationally relevant mission tasks and scenarios. The results will be summarized and the lessons learned for prototyping attitude symbology on HMDs will be discussed.

  1. Teacher Perspectives about Lesson Study in Secondary School Departments: A Collaborative Vehicle for Professional Learning and Practice Development

    ERIC Educational Resources Information Center

    Cajkler, Wasyl; Wood, Phil; Norton, Julie; Pedder, David; Xu, Haiyan

    2015-01-01

    Two departments in a secondary school in England participated in "lesson study" projects over a five-month period to explore its usefulness as a vehicle for professional development. Through a cycle of two research lessons, conducted separately in each department, teachers identified challenges that inhibited the learning of their…

  2. A College That Relied on NeXT Computers Plans To Switch to Apple.

    ERIC Educational Resources Information Center

    Wilson, David L.

    1997-01-01

    Allegheny College (Pennsylvania), which uses NeXT computers, was dismayed when the technically superior operating system was orphaned but are now delighted that the company has been bought by Apple Computer and will make the operating system standard on Apple computers. The object-oriented operating system allows relatively unsophisticated users…

  3. Importance Of Quality Control in Reducing System Risk, a Lesson Learned From The Shuttle and a Recommendation for Future Launch Vehicles

    NASA Technical Reports Server (NTRS)

    Safie, Fayssal M.; Messer, Bradley P.

    2006-01-01

    This paper presents lessons learned from the Space Shuttle return to flight experience and the importance of these lessons learned in the development of new the NASA Crew Launch Vehicle (CLV). Specifically, the paper discusses the relationship between process control and system risk, and the importance of process control in improving space vehicle flight safety. It uses the External Tank (ET) Thermal Protection System (TPS) experience and lessons learned from the redesign and process enhancement activities performed in preparation for Return to Flight after the Columbia accident. The paper also, discusses in some details, the Probabilistic engineering physics based risk assessment performed by the Shuttle program to evaluate the impact of TPS failure on system risk and the application of the methodology to the CLV.

  4. Team Collaboration: Lessons Learned Report

    NASA Technical Reports Server (NTRS)

    Arterberrie, Rhonda Y.; Eubanks, Steven W.; Kay, Dennis R.; Prahst, Stephen E.; Wenner, David P.

    2005-01-01

    An Agency team collaboration pilot was conducted from July 2002 until June 2003 and then extended for an additional year. The objective of the pilot was to assess the value of collaboration tools and adoption processes as applied to NASA teams. In an effort to share knowledge and experiences, the lessons that have been learned thus far are documented in this report. Overall, the pilot has been successful. An entire system has been piloted - tools, adoption, and support. The pilot consisted of two collaboration tools, a team space and a virtual team meeting capability. Of the two tools that were evaluated, the team meeting tool has been more widely accepted. Though the team space tool has been met with a lesser degree of acceptance, the need for such a tool in the NASA environment has been evidenced. Both adoption techniques and support were carefully developed and implemented in a way that has been well received by the pilot participant community.

  5. Risk management and lessons learned solutions for satellite product assurance

    NASA Astrophysics Data System (ADS)

    Larrère, Jean-Luc

    2004-08-01

    The historic trend of the space industry towards lower cost programmes and more generally a better economic efficiency raises a difficult question to the quality assurance community: how to achieve the same—or better—mission success rate while drastically reducing the cost of programmes, hence the cost and level of quality assurance activities. EADS Astrium Earth Observation and Science (France) Business Unit have experimented Risk Management and Lessons Learned on their satellite programmes to achieve this goal. Risk analysis and management are deployed from the programme proposal phase through the development and operations phases. Results of the analysis and the corresponding risk mitigation actions are used to tailor the product assurance programme and activities. Lessons learned have been deployed as a systematic process to collect positive and negative experience from past and on-going programmes and feed them into new programmes. Monitoring and justification of their implementation in programmes is done under supervision from the BU quality assurance function. Control of the system is ensured by the company internal review system. Deployment of these methods has shown that the quality assurance function becomes more integrated in the programme team and development process and that its tasks gain focus and efficiency while minimising the risks associated with new space programmes.

  6. Creating a Community of Practice: Lessons Learned from the Center for Astronomy Education (Invited)

    NASA Astrophysics Data System (ADS)

    Brissenden, G.

    2009-12-01

    The Center for Astronomy Education (CAE) is devoted to improving teaching and learning in Astro 101. To accomplish this, a vital part of CAE is our broader community of practice which includes over 1000 instructors, graduate and undergraduate students, and postdocs. It is this greater community of practice that supports each other, helps, and learns from each other beyond what would be possible without it. As our community of practice has grown, we at CAE have learned many lessons about how different facets of CAE can best be used to promote and support our community both as a whole and for individual members. We will discuss the various facets of CAE, such as our online discussion group Astrolrner@CAE (http://astronomy101.jpl.nasa.gov/discussion) and its Guest Moderator program, our CAE Regional Teaching Exchange Coordinator program, our CAE Workshop Presenter Apprenticeship Training program, our online This Month’s Teaching Strategy, monthly newsletters, and various types of socializing and networking sessions we hold at national meetings. But more importantly, we will discuss the lessons we’ve learned about what does and does not work in building community within each of these facets.

  7. Lessons Learned from Coordinating Relay Activities at Mars

    NASA Technical Reports Server (NTRS)

    Gladden, Roy E.; Hwang, Pauline; Waggoner, Bruce; McLaughlin, Bruce; Fieseler, Paul; Thomas, Reid; Bigwood, Maria; Herrera, Paul

    2005-01-01

    The Mission Management Office at the Jet Propulsion Laboratory was tasked with coordinating the relay of data between multiple spacecraft at Mars in support of the Mars Exploration Rover Missions in early 2004. The confluence of three orbiters (Mars Global Surveyor, Mars Odyssey, and Mars Express), two rovers (Spirit and Opportunity), and one lander (Beagle 2) has provided a challenging operational scenario that required careful coordination between missions to provide the necessary support and to avoid potential interference during simultaneous relay sessions. As these coordination efforts progressed, several important lessons were learned that should be applied to future Mars relay activities.

  8. Two gimbal bearing case studies: Some lessons learned

    NASA Technical Reports Server (NTRS)

    Loewenthal, Stuart H.

    1988-01-01

    Two troublesome, torque related problems associated with gimbal actuators are discussed. Large, thin section angular contact bearings can have a surprisingly high torque sensitivity to radial thermal gradients. A predictive thermal-mechanical bearing analysis, as described, was helpful in establishing a safe temperature operating envelope. In the second example, end-of-travel torque limits of an oscillatory gimbal bearing appoached motor stall during limit cycling life tests. Bearing modifications required to restore acceptable torque performance are described. The lessons learned from these case studies should benefit designers of precision gimbals where singular bearing torque related problems are not uncommon.

  9. USMC Ground Surveillance Robot (GSR): Lessons Learned

    NASA Astrophysics Data System (ADS)

    Harmon, S. Y.

    1987-02-01

    This paper describes the design of an autonomous vehicle and the lessons learned during the implementation of that complex robot. The major problems encountered to which solutions were found include sensor processing bandwidth limitations, coordination of the interactions between major subsystems, sensor data fusion and system knowledge representation. Those problems remaining unresolved include system complexity management, the lack of powerful system monitoring and debugging tools, exploratory implementation of a complex system and safety and testing issues. Many of these problems arose from working with underdeveloped and continuously evolving technology and will probably be resolved as the technological resources mature and stabilize. Unfortunately, other problems will continue to plague developers throughout the evolution of autonomous system technology.

  10. Smart border: ad-hoc wireless sensor networks for border surveillance

    NASA Astrophysics Data System (ADS)

    He, Jun; Fallahi, Mahmoud; Norwood, Robert A.; Peyghambarian, Nasser

    2011-06-01

    Wireless sensor networks have been proposed as promising candidates to provide automated monitoring, target tracking, and intrusion detection for border surveillance. In this paper, we demonstrate an ad-hoc wireless sensor network system for border surveillance. The network consists of heterogeneously autonomous sensor nodes that distributively cooperate with each other to enable a smart border in remote areas. This paper also presents energy-aware and sleeping algorithms designed to maximize the operating lifetime of the deployed sensor network. Lessons learned in building the network and important findings from field experiments are shared in the paper.

  11. Organizing an NGO-Sponsored English-Medium School in South India: Lessons Learned

    ERIC Educational Resources Information Center

    Gibb, Gordon S.

    2012-01-01

    This paper describes lessons learned from the first-year education efforts of Rising Star Outreach of India, a U.S.-based nongovernmental charitable organization (NGO) working with leprosy colonies in Tamil Nadu, India. In 2008, Rising Star Outreach established a residential school to provide English-medium schooling for 180 colony children in…

  12. Lessons Learned in Designing and Implementing a Computer-Adaptive Test for English

    ERIC Educational Resources Information Center

    Burston, Jack; Neophytou, Maro

    2014-01-01

    This paper describes the lessons learned in designing and implementing a computer-adaptive test (CAT) for English. The early identification of students with weak L2 English proficiency is of critical importance in university settings that have compulsory English language course graduation requirements. The most efficient means of diagnosing the L2…

  13. Lessons learned from a regional strategy for resource allocation.

    PubMed

    Edwards, Janine C; Stapley, Jonathan; Akins, Ralitsa; Silenas, Rasa; Williams, Josie R

    2005-01-01

    Two qualitative case studies focus on the allocation of CDC funds distributed during 2002 for bioterrorism preparedness in two Texas public health regions (each as populous and complex as many states). Lessons learned are presented for public health officials and others who work to build essential public health services and security for our nation. The first lesson is that personal relationships are the cornerstone of preparedness. A major lesson is that a regional strategy to manage funds may be more effective than allocating funds on a per capita basis. One regional director required every local department to complete a strategic plan as a basis for proportional allocation of the funds. Control of communicable diseases was a central component of the planning. Some funds were kept at the regional level to provide epidemiology services, computer software, equipment, and training for the entire region. Confirmation of the value of this regional strategy was expressed by local public health and emergency management officials in a focus group 1 year after the strategy had been implemented. The group members also pointed out the need to streamline the planning process, provide up-to-date computer networks, and receive more than minimal communication. This regional strategy can be viewed from the perspective of adaptive leadership, defined as activities to bring about constructive change, which also can be used to analyze other difficult areas of preparedness.

  14. Lessons Learned From Community-Based Approaches to Sodium Reduction

    PubMed Central

    Kane, Heather; Strazza, Karen; Losby PhD, Jan L.; Lane, Rashon; Mugavero, Kristy; Anater, Andrea S.; Frost, Corey; Margolis, Marjorie; Hersey, James

    2017-01-01

    Purpose This article describes lessons from a Centers for Disease Control and Prevention initiative encompassing sodium reduction interventions in six communities. Design A multiple case study design was used. Setting This evaluation examined data from programs implemented in six communities located in New York (Broome County, Schenectady County, and New York City); California (Los Angeles County and Shasta County); and Kansas (Shawnee County). Subjects Participants (n = 80) included program staff, program directors, state-level staff, and partners. Measures Measures for this evaluation included challenges, facilitators, and lessons learned from implementing sodium reduction strategies. Analysis The project team conducted a document review of program materials and semi structured interviews 12 to 14 months after implementation. The team coded and analyzed data deductively and inductively. Results Five lessons for implementing community-based sodium reduction approaches emerged: (1) build relationships with partners to understand their concerns, (2) involve individuals knowledgeable about specific venues early, (3) incorporate sodium reduction efforts and messaging into broader nutrition efforts, (4) design the program to reduce sodium gradually to take into account consumer preferences and taste transitions, and (5) identify ways to address the cost of lower-sodium products. Conclusion The experiences of the six communities may assist practitioners in planning community-based sodium reduction interventions. Addressing sodium reduction using a community-based approach can foster meaningful change in dietary sodium consumption. PMID:24575726

  15. Perspectives on Blended Learning through the On-Line Platform, LabLessons, for Chemistry

    ERIC Educational Resources Information Center

    Jihad, Teeba; Klementowicz, Edward; Gryczka, Patrick; Sharrock, Chappel; Maxfield, MacRae; Lee, Yongjun; Montclare, Jin Kim

    2018-01-01

    The effectiveness of blended learning was evaluated through the integration of an online chemistry platform, LabLessons. Two modules, "Formation of Hydrogen" and "Titration," were designed by college mentors alongside classroom chemistry teachers to engage and allow high school students to better comprehend these scientific…

  16. International Space Station Passive Thermal Control System Analysis, Top Ten Lessons-Learned

    NASA Technical Reports Server (NTRS)

    Iovine, John

    2011-01-01

    The International Space Station (ISS) has been on-orbit for over 10 years, and there have been numerous technical challenges along the way from design to assembly to on-orbit anomalies and repairs. The Passive Thermal Control System (PTCS) management team has been a key player in successfully dealing with these challenges. The PTCS team performs thermal analysis in support of design and verification, launch and assembly constraints, integration, sustaining engineering, failure response, and model validation. This analysis is a significant body of work and provides a unique opportunity to compile a wealth of real world engineering and analysis knowledge and the corresponding lessons-learned. The analysis lessons encompass the full life cycle of flight hardware from design to on-orbit performance and sustaining engineering. These lessons can provide significant insight for new projects and programs. Key areas to be presented include thermal model fidelity, verification methods, analysis uncertainty, and operations support.

  17. Lessons Learned Designing and Using an Online Discussion Forum for Care Coordinators in Primary Care.

    PubMed

    Ferrante, Jeanne M; Friedman, Asia; Shaw, Eric K; Howard, Jenna; Cohen, Deborah J; Shahidi, Laleh

    2015-10-18

    While an increasing number of researchers are using online discussion forums for qualitative research, few authors have documented their experiences and lessons learned to demonstrate this method's viability and validity in health services research. We comprehensively describe our experiences, from start to finish, of designing and using an asynchronous online discussion forum for collecting and analyzing information elicited from care coordinators in Patient-Centered Medical Homes across the United States. Our lessons learned from each phase, including planning, designing, implementing, using, and ending this private online discussion forum, provide some recommendations for other health services researchers considering this method. An asynchronous online discussion forum is a feasible, efficient, and effective method to conduct a qualitative study, particularly when subjects are health professionals. © The Author(s) 2015.

  18. Lessons Learned Designing and Using an Online Discussion Forum for Care Coordinators in Primary Care

    PubMed Central

    Ferrante, Jeanne M.; Friedman, Asia; Shaw, Eric K.; Howard, Jenna; Cohen, Deborah J.; Shahidi, Laleh

    2016-01-01

    While an increasing number of researchers are using online discussion forums for qualitative research, few authors have documented their experiences and lessons learned to demonstrate this method’s viability and validity in health services research. We comprehensively describe our experiences, from start to finish, of designing and using an asynchronous online discussion forum for collecting and analyzing information elicited from care coordinators in Patient-Centered Medical Homes across the United States. Our lessons learned from each phase, including planning, designing, implementing, using, and ending this private online discussion forum, provide some recommendations for other health services researchers considering this method. An asynchronous online discussion forum is a feasible, efficient, and effective method to conduct a qualitative study, particularly when subjects are health professionals. PMID:26481942

  19. Evaluation and lessons learned from an undergraduate service learning course providing youth-focused relationship education.

    PubMed

    McElwain, Alyssa; Finnegan, Vanessa; Whittaker, Angela; Kerpelman, Jennifer; Adler-Baeder, Francesca; Duke, Adrienne

    2016-10-01

    Adolescent romantic relationships are known to have a significant impact on individual well-being and development. However, few teens experience formal education about the knowledge and skills necessary for building healthy romantic relationships. In response, a statewide relationship education initiative was developed at a large university in a Southeastern state. Undergraduates who enrolled in a service learning course in Human Development and Family Studies partnered with this initiative and implemented a relationship education program targeting high school students. A service learning model is used in this initiative because it offers opportunities for students' professional development and experiential learning. The present article provides a formative and illustrative summative evaluation of the service learning program. Specifically, the primary aims of this paper are to 1) provide an overview of the service learning course components; 2) describe preparation of the service learning students and their implementation of the relationship education program; 3) discuss challenges and lessons learned; and 4) offer initial evidence of effectiveness by showing change in targeted outcomes for the high school student recipients of the relationship education program. Copyright © 2016 Elsevier Ltd. All rights reserved.

  20. How Is the Learning Environment in Physics Lesson with Using 7E Model Teaching Activities

    ERIC Educational Resources Information Center

    Turgut, Umit; Colak, Alp; Salar, Riza

    2017-01-01

    The aim of this research is to reveal the results in the planning, implementation and evaluation of the process for learning environments to be designed in compliance with 7E learning cycle model in physics lesson. "Action research", which is a qualitative research pattern, is employed in this research in accordance with the aim of the…

  1. Experiences and lessons learned for delivery of micronutrient powders interventions

    PubMed Central

    Reerink, Ietje; Poonawala, Alia; Nyhus Dhillon, Christina; Aburto, Nancy; Chaudhery, Deepika; Kroeun, Hou; Griffiths, Marcia; Haque, Mohammad Raisul; Bonvecchio, Anabelle; Jefferds, Maria Elena; Rawat, Rahul

    2017-01-01

    Abstract An effective delivery strategy coupled with relevant social and behaviour change communication (SBCC) have been identified as central to the implementation of micronutrient powders (MNP) interventions, but there has been limited documentation of what works. Under the auspices of “The Micronutrient Powders Consultation: Lessons Learned for Operational Guidance,” three working groups were formed to summarize experiences and lessons across countries regarding MNP interventions for young children. This paper focuses on programmatic experiences related to MNP delivery (models, platforms, and channels), SBCC, and training. Methods included a review of published and grey literature, interviews with key informants, and deliberations throughout the consultation process. We found that most countries distributed MNP free of charge via the health sector, although distribution through other platforms and using subsidized fee for product or mixed payment models have also been used. Community‐based distribution channels have generally shown higher coverage and when part of an infant and young child feeding approach, may provide additional benefit given their complementarity. SBCC for MNP has worked best when focused on meeting the MNP behavioural objectives (appropriate use, intake adherence, and related infant and young child feeding behaviours). Programmers have learned that reincorporating SBCC and training throughout the intervention life cycle has allowed for much needed adaptations. Diverse experiences delivering MNP exist, and although no one‐size‐fits‐all approach emerged, well‐established delivery platforms, community involvement, and SBCC‐centred designs tended to have more success. Much still needs to be learned on MNP delivery, and we propose a set of implementation research questions that require further investigation. PMID:28960878

  2. Teamwork situated in multiteam systems: Key lessons learned and future opportunities.

    PubMed

    Shuffler, Marissa L; Carter, Dorothy R

    2018-01-01

    Many important contexts requiring teamwork, including health care, space exploration, national defense, and scientific discovery, present important challenges that cannot be addressed by a single team working independently. Instead, the complex goals these contexts present often require effectively coordinated efforts of multiple specialized teams working together as a multiteam system (MTS). For almost 2 decades, researchers have endeavored to understand the novelties and nuances for teamwork and collaboration that ensue when teams operate together as "component teams" in these interdependent systems. In this special issue on the settings of teamwork, we aim to synthesize what is known thus far regarding teamwork situated in MTS contexts and offer new directions and considerations for developing, maintaining, and sustaining effective collaboration in MTSs. Our review of extant research on MTSs reveals 7 key lessons learned regarding teamwork situated in MTSs, but also reveals that much is left to learn about the science and practice of ensuring effective multiteam functioning. We elaborate these lessons and delineate 4 major opportunities for advancing the science of MTSs as a critical embedding context for collaboration and teamwork, now and in the future. (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  3. Head and neck trauma in Iraq and Afghanistan: different war, different surgery, lessons learned.

    PubMed

    Brennan, Joseph

    2013-10-01

    The objectives are to compare and contrast the head and neck trauma experience in Iraq and Afghanistan and to identify trauma lessons learned that are applicable to civilian practice. A retrospective review of one head and neck surgeon's operative experience in Iraq and Afghanistan was performed using operative logs and medical records. The surgeon's daily operative log book with patient demographic data and operative reports was reviewed. Also, patient medical records were examined to identify the preoperative and postoperative course of care. The head and neck trauma experiences in Iraq and Afghanistan were very different, with a higher percentage of emergent cases performed in Iraq. In Iraq, only 10% of patients were pretreated at a facility with surgical capabilities. In Afghanistan, 93% of patients were pretreated at such facilities. Emergent neck exploration for penetrating neck trauma and emergent airway surgery were more common in Iraq, which most likely accounted for the increased perioperative mortality also seen in Iraq (5.3% in Iraq vs. 1.3% in Afghanistan). Valuable lessons regarding soft tissue trauma repair, midface fracture repair, and mandible fracture repair were learned. The head and neck trauma experiences in Iraq and Afghanistan were very different, and the future training for mass casualty trauma events should reflect these differences. Furthermore, valuable head and neck trauma lessons learned in both war zones are applicable to the civilian practice of trauma. Level 4. Copyright © 2013 The American Laryngological, Rhinological and Otological Society, Inc.

  4. Lessons learned from implementing service-oriented clinical decision support at four sites: A qualitative study.

    PubMed

    Wright, Adam; Sittig, Dean F; Ash, Joan S; Erickson, Jessica L; Hickman, Trang T; Paterno, Marilyn; Gebhardt, Eric; McMullen, Carmit; Tsurikova, Ruslana; Dixon, Brian E; Fraser, Greg; Simonaitis, Linas; Sonnenberg, Frank A; Middleton, Blackford

    2015-11-01

    To identify challenges, lessons learned and best practices for service-oriented clinical decision support, based on the results of the Clinical Decision Support Consortium, a multi-site study which developed, implemented and evaluated clinical decision support services in a diverse range of electronic health records. Ethnographic investigation using the rapid assessment process, a procedure for agile qualitative data collection and analysis, including clinical observation, system demonstrations and analysis and 91 interviews. We identified challenges and lessons learned in eight dimensions: (1) hardware and software computing infrastructure, (2) clinical content, (3) human-computer interface, (4) people, (5) workflow and communication, (6) internal organizational policies, procedures, environment and culture, (7) external rules, regulations, and pressures and (8) system measurement and monitoring. Key challenges included performance issues (particularly related to data retrieval), differences in terminologies used across sites, workflow variability and the need for a legal framework. Based on the challenges and lessons learned, we identified eight best practices for developers and implementers of service-oriented clinical decision support: (1) optimize performance, or make asynchronous calls, (2) be liberal in what you accept (particularly for terminology), (3) foster clinical transparency, (4) develop a legal framework, (5) support a flexible front-end, (6) dedicate human resources, (7) support peer-to-peer communication, (8) improve standards. The Clinical Decision Support Consortium successfully developed a clinical decision support service and implemented it in four different electronic health records and four diverse clinical sites; however, the process was arduous. The lessons identified by the Consortium may be useful for other developers and implementers of clinical decision support services. Copyright © 2015 Elsevier Ireland Ltd. All rights reserved.

  5. Competencies: From Deconstruction to Reconstruction and Back Again, Lessons Learned

    PubMed Central

    Leach, David C.

    2008-01-01

    I address the potential impact of the Association of Schools of Public Health’s development of a competency model for the graduate Master of Public Health. I reflect on the model in relation to the Accreditation Council for Graduate Medical Education’s adoption of a competency-based model for medical education. Six lessons learned by the Accreditation Council for Graduate Medical Education that the Association of Schools of Public Health might consider in moving forward are how learning outcomes can be enhanced by using competency models, the effect of competency development processes in “creating a common language” among educators, the benefits and challenges of numerous competencies within a model, the usefulness of the Dreyfus model for progressive competency development, the need for multiple assessment tools used over time, and the value of learning portfolios. PMID:18633085

  6. EDSN Development Lessons Learned

    NASA Technical Reports Server (NTRS)

    Chartres, James; Sanchez, Hugo S.; Hanson, John

    2014-01-01

    The Edison Demonstration of Smallsat Networks (EDSN) is a technology demonstration mission that provides a proof of concept for a constellation or swarm of satellites performing coordinated activities. Networked swarms of small spacecraft will open new horizons in astronomy, Earth observations and solar physics. Their range of applications include the formation of synthetic aperture radars for Earth sensing systems, large aperture observatories for next generation telescopes and the collection of spatially distributed measurements of time varying systems, probing the Earths magnetosphere, Earth-Sun interactions and the Earths geopotential. EDSN is a swarm of eight 1.5U Cubesats with crosslink, downlink and science collection capabilities developed by the NASA Ames Research Center under the Small Spacecraft Technology Program (SSTP) within the NASA Space Technology Mission Directorate (STMD). This paper describes the concept of operations of the mission and planned scientific measurements. The development of the 8 satellites for EDSN necessitated the fabrication of prototypes, Flatsats and a total of 16 satellites to support the concurrent engineering and rapid development. This paper has a specific focus on the development, integration and testing of a large number of units including the lessons learned throughout the project development.

  7. Learning and Forgetting New Names and Objects in MCI and AD

    ERIC Educational Resources Information Center

    Gronholm-Nyman, Petra; Rinne, Juha O.; Laine, Matti

    2010-01-01

    We studied how subjects with mild cognitive impairment (MCI), early Alzheimer's disease (AD) and age-matched controls learned and maintained the names of unfamiliar objects that were trained with or without semantic support (object definitions). Naming performance, phonological cueing, incidental learning of the definitions and recognition of the…

  8. Learning lessons from a traditional midwifery workforce in western Kenya.

    PubMed

    Dietsch, Elaine; Mulimbalimba-Masururu, Luc

    2011-06-01

    To learn lessons from a traditional midwifery workforce in Western Kenya. With the assistance of an interpreter, qualitative data was collected during in-depth individual and group interviews with traditional midwives. English components of the interviews were transcribed verbatim and the data thematically analysed. A rural, economically disadvantaged area of Western Kenya. 84 participants who practise as traditional midwives. It was common for these traditional midwives to believe they had received a spiritual gift which enabled them to learn the skills required from another midwife, often but not always their mother. The participants commenced their midwifery practice by learning through an apprenticeship or mentoring model but they anticipated their learning to be lifelong. Lifelong learning occurred through experiential reflection and reciprocal learning from each other. Learning in colleges, hospitals and through seminars facilitated by non-government organisations was also desired and esteemed by the participants but considered a secondary, though more authoritative source of learning. The primary learning strategies used by the participants enabled them to have confidence in physiological birth; birthing women; and their own skills as traditional midwives. Learning from women and continued professional reflection are ways of learning for midwives that may increase their confidence in women, birthing and their midwifery skills. These attributes are essential for midwives, regardless of their workforce context. Copyright © 2011 Elsevier Ltd. All rights reserved.

  9. Y&E Lessons in Learning: Youth and Education Program News, Summer 2003

    ERIC Educational Resources Information Center

    Cournoyer, David, Ed.

    2003-01-01

    This Summer 2003 issue of "Y&E Lessons in Learning" contains the following articles: (1) Playgrounds Where All Kids Are Able to Play; (2) Kellogg Foundation Promotes Youth Voices in Special Comic Book; (3) Families for Kids: A Powerful Approach to System Reform; (4) New Program Focuses Community Leaders on Educational Change; (5)…

  10. Effects of Training in Universal Design for Learning on Lesson Plan Development

    ERIC Educational Resources Information Center

    Spooner, Fred; Baker, Joshua N.; Harris, Amber A.; Ahlgrim-Delzell, Lynn; Browder, Diane M.

    2007-01-01

    The effects of training in Universal Design for Learning (UDL) on lesson plan development of special and general educators in a college classroom environment were investigated. A true experimental group design with a control group was used for this study. A one-hour teacher training session introduced UDL to the experimental group; the control…

  11. The Whys, Hows, and Lessons Learned from Our 780-Person Writing Class

    ERIC Educational Resources Information Center

    Bowse, Robert; Lawrence, Holly

    2017-01-01

    Two business communication faculty share the story of teaching a 780-person business writing class. The article discusses the challenges of teaching such a large writing class. Challenges ranged from adopting a hybrid course model to hiring adjunct faculty for help with the task of grading. The article offers lessons learned, and recommends that…

  12. Lessons Learned Developing an Extension-Based Training Program for Farm Labor Supervisors

    ERIC Educational Resources Information Center

    Roka, Fritz M.; Thissen, Carlene A.; Monaghan, Paul F.; Morera, Maria C.; Galindo-Gonzalez, Sebastian; Tovar-Aguilar, Jose Antonio

    2017-01-01

    This article outlines a four-step model for developing a training program for farm labor supervisors. The model draws on key lessons learned during the development of the University of Florida Institute of Food and Agricultural Sciences Farm Labor Supervisor Training program. The program is designed to educate farm supervisors on farm labor laws…

  13. Notification: Lessons Learned from Implementing the American Recovery and Reinvestment Act of 2009 (Recovery Act)

    EPA Pesticide Factsheets

    Project #OA-FY12-0360, March 5, 2012. The Recovery Funds Working Group of the Recovery Accountability and Transparency Board has initiated a project to capture lessons learned from Recovery Act implementation.

  14. "Lessons learned" : evaluation of intelligent transportation systems (ITS) implementation at Santee Wateree Regional Transportation Authority.

    DOT National Transportation Integrated Search

    2002-06-01

    The purpose of this lessons learned is to document the experience with Intelligent Transportation Systems (ITS) : implementation at the Santee Wateree Regional Transportation authority (SWRTA). SWRTA is a public : transportation provider servin...

  15. NASA Space Mechanisms Handbook: Lessons Learned Documented

    NASA Technical Reports Server (NTRS)

    Fusaro, Robert L.

    1999-01-01

    The need to improve space mechanism reliability is underscored by a long history of flight failures and anomalies caused by malfunctioning mechanisms on spacecraft and launch vehicles. Some examples of these failures are listed in a table. Because much experience has been gained over the years, many specialized design practices have evolved and many unsatisfactory design approaches have been identified.NASA and the NASA Lewis Research Center conducted a Lessons Learned Study (refs. 1 and 2) and wrote a handbook to document what has been learned in the past. The primary goals of the handbook were to identify desirable and undesirable design practices for space mechanisms and to reduce the number of failures caused by the repetition of past design errors. Another goal was to identify a variety of design approaches for specific applications and to provide the associated considerations and caveats for each approach in an effort to help designers choose the approach most suitable for each application. This technical summary outlines the goals and objectives of the handbook and study as well as the contents of the handbook.

  16. Applying a quality assurance system model to curriculum transformation: transferable lessons learned.

    PubMed

    Kayyal, Mohamad; Gibbs, Trevor

    2012-01-01

    As curricula are transformed throughout the world in response to the need for modern medical education, much attention is given to curriculum content and associated teaching, learning and assessment methodologies. However, an important component of any curriculum is its organisational management, how it is all held together, the way the process is conducted and what mechanisms are applied to ensure quality. In 2008, the Faculty of Medicine at Damascus University embarked on a journey of curriculum transformation. The transformation process was specifically and initially based on a quality assurance model. This entailed a concept for realising curriculum transformation; a framework for organisational management, which ensures that the necessary enabling conditions are met and issues of conflicts in roles and responsibilities are resolved; a plan for securing resources and creating the necessary governance structures needed to carry the transformation process forward; and a systematic analysis of risks facing the effective realisation of the transformation process and the corresponding mitigation measures to alleviate their impacts. Although a full evaluation of such an activity produces reliable results only after a period of time, this article demonstrates the principles and structures applied to the initial process based on some of the early lessons learned. We perceive that the lessons learned from this activity are capable of being translated to other Universities, in other similar developing countries; our hope is that others can learn from our experiences.

  17. Learning the Blues. [Lesson Plan].

    ERIC Educational Resources Information Center

    2001

    This lesson introduces students to the "blues," one of the most distinctive and influential elements of African-American musical tradition. With this lesson plan, students can take a virtual field trip to Memphis, Tennessee, one of the prominent centers of blues activities, and explore the history of the blues in the work of W. C. Handy…

  18. Lessons learned from translators and interpreters from the Dinka tribe of southern Sudan.

    PubMed

    Baird, Martha B

    2011-04-01

    This article discusses the methodological challenges associated with working with translators and interpreters from the Dinka tribe of southern Sudan during an ethnographic study with refugee Dinka women who were resettled with their children in the United States. Navigating the cultural differences between the researcher, the translator, and the interpreters provided a deeper understanding about the culture of the study population. The lessons learned included the importance of cultural congruence between the interpreters and participants; the education, training, and experience of the interpreters; and the difficulties encountered in preparing interpreters according to university institutional review board requirements. Cultural differences such as time perception and communication and literacy styles were negotiated throughout each phase of the study. The most valuable lesson learned from this experience was the importance of the relationship between the researcher, the translator, and the interpreters as well as between the interpreters and participants to achieve credibility and trustworthiness of the study results.

  19. Lessons Learned and Future Goals of the High Lift Prediction Workshops

    NASA Technical Reports Server (NTRS)

    Rumsey, Christopher L.; Lee-Rausch, Elizabeth; Slotnick, Jeffrey P.

    2016-01-01

    The American Institute of Aeronautics and Astronautics (AIAA) High Lift Prediction Workshop series is described. Two workshops have been held to date. Major conclusions are summarized, and plans for future workshops are outlined. A compilation of lessons learned from the first two workshops is provided. This compilation includes a summary of needs for future high-lift experiments that are intended for computational fluid dynamics (CFD) validation.

  20. Lessons Learned From Developing A Streaming Data Framework for Scientific Analysis

    NASA Technical Reports Server (NTRS)

    Wheeler. Kevin R.; Allan, Mark; Curry, Charles

    2003-01-01

    We describe the development and usage of a streaming data analysis software framework. The framework is used for three different applications: Earth science hyper-spectral imaging analysis, Electromyograph pattern detection, and Electroencephalogram state determination. In each application the framework was used to answer a series of science questions which evolved with each subsequent answer. This evolution is summarized in the form of lessons learned.

  1. Learning from Lessons: Studying the Structure and Construction of Mathematics Teacher Knowledge in Australia, China and Germany

    ERIC Educational Resources Information Center

    Chan, Man Ching Esther; Clarke, David J.; Clarke, Doug M.; Roche, Anne; Cao, Yiming; Peter-Koop, Andrea

    2018-01-01

    The major premise of this project is that teachers learn from the act of teaching a lesson. Rather than asking "What must a teacher already know in order to practice effectively?", this project asks "What might a teacher learn through their activities in the classroom and how might this learning be optimised?" In this project,…

  2. Papermaking and Poetry. ArtsEdge Curricula, Lessons and Activities.

    ERIC Educational Resources Information Center

    Withroe, J.

    In this lesson, designed to be taught within a unit on China, primary-grade students will learn about the history of papermaking and its origins in China and even learn how to make their own paper. After learning about Chinese art and culture in the lesson, students will write their own "cinquain" poem about China. The lesson presents an…

  3. Lesson Study: Researching Learning about Teaching from Research Mathematics Lessons

    ERIC Educational Resources Information Center

    Corcoran, Dolores

    2009-01-01

    Lesson study is a form of teacher professional development that is intrinsic to the Japanese educational system in first and second level schools and in teacher education. Lesson study has been credited with the success of Japanese pupils in international comparative tests of mathematics achievement (Stigler and Hiebert, 1999). It is gaining…

  4. Carbon Monitoring System Applications Framework: Lessons Learned from Stakeholder Engagement Activities

    NASA Astrophysics Data System (ADS)

    Sepulveda Carlo, E.; Escobar, V. M.; Delgado Arias, S.; Forgotson, C.

    2017-12-01

    The NASA Carbon Monitoring System initiated by U.S. Congress in 2010 is developing products that characterize and quantify carbon sources and sinks in the United States and the global tropics. In 2013, an applications effort was selected to engage potential end users and gather feedback about their data needs. For the past four years the CMS applications efforts has expanded and implemented a number of strategies to connect carbon scientists to decision-makers, contributing to the societal benefits of CMS data products. The applications efforts use crowd sourcing to collects feedback from stakeholders on challenges and lessons learned in the use of CMS data products. Some of the most common data needs from engaged organizations include above and below-ground biomass and fluxes in forestlands and wetlands, and greenhouse gas (GHG) emissions across all land use/cover and land use changes. Stakeholder organizations' needs for CMS data products support national GHG inventories following the Paris Agreement, carbon markets, and sub-national natural resources management and policies. The lessons learned report presents stakeholder specific applications, challenges, and successes from using CMS data products. To date, the most common uses of CMS products include: conservation efforts, emissions inventory, forestry and land cover applications, and carbon offset projects. The most common challenges include: the need for familiar and consistent products over time, budget constraints, and concern with uncertainty of modeled results. Recurrent recommendations from stakeholder indicate that CMS should provide high resolution (30m) and frequent data products updates (annually). The applications efforts have also helped identified success stories from different CMS projects, including the development of the GHG emissions inventory from Providence, RI, the improvement of the U.S. GHG Inventory though the use of satellite data, and the use of high resolution canopy cover maps for

  5. Evidence for Ancient Life in Mars Meteorites: Lessons Learned

    NASA Technical Reports Server (NTRS)

    McKay, D. S.

    1998-01-01

    The lines of evidence we first proposed as supporting a hypothesis of early life on Mars are discussed by Treiman, who presents pros and cons of our hypothesis in the light of subsequent research by many groups. Our assessment of the current status of the many controversies over our hypothesis is given in reports by Gibson et al. Rather than repeat or elaborate on that information, I prefer to take an overview and present what I think are some of the "lessons learned" by our team in particular, and by the science community in general.

  6. Transformation of an academic medical center: lessons learned from restructuring and downsizing.

    PubMed

    Woodard, B; Fottler, M D; Kilpatrick, A O

    1999-01-01

    This article reviews management literature on health care transformation and describes the processes, including restructuring, job redesign, and downsizing, involved in one academic medical center's experience. The article concludes with lessons learned at each of the stages of the transformation process: planning, implementation, and process continuation. Managerial implications for similar transformation efforts in other health care organizations are suggested.

  7. Learning with Multiple Representations: An Example of a Revision Lesson in Mathematics

    ERIC Educational Resources Information Center

    Wong, Darren; Poo, Sng Peng; Hock, Ng Eng; Kang, Wee Loo

    2011-01-01

    We describe an example of learning with multiple representations in an A-level revision lesson on mechanics. The context of the problem involved the motion of a ball thrown vertically upwards in air and studying how the associated physical quantities changed during its flight. Different groups of students were assigned to look at the ball's motion…

  8. International academic service learning: lessons learned from students' travel experiences of diverse cultural and health care practices in morocco.

    PubMed

    Kaddoura, Mahmoud; Puri, Aditi; Dominick, Christine A

    2014-01-01

    Academic service learning (ASL) is an active teaching-learning approach to engage students in meaningful hands-on activities to serve community-based needs. Nine health professions students from a private college and a private university in the northeastern United States volunteered to participate in an ASL trip to Morocco. The participants were interviewed to reflect on their experiences. This article discusses the lessons learned from students' ASL experiences regarding integrating ASL into educational programs. The authors recommend a paradigm shift in nursing and dental hygiene curricula to appreciate diversity and promote cultural competency, multidisciplinary teamwork, and ethics-based education. Copyright 2014, SLACK Incorporated.

  9. Applications and Lessons Learned using Data from the Atmospheric Infrared Sounder

    NASA Astrophysics Data System (ADS)

    Ray, S. E.; Fetzer, E. J.; Olsen, E. T.; Lambrigtsen, B.; Pagano, T. S.; Teixeira, J.; Licata, S. J.; Hall, J. R.

    2016-12-01

    Applications and Lessons Learned using Data from the Atmospheric Infrared SounderSharon Ray, Jet Propulsion Laboratory, California Institute of Technology The Atmospheric Infrared Sounder (AIRS) on NASA's Aqua spacecraft has been returning daily global observations of Earth's atmospheric constituents and properties since 2002. With a 12-year data record and daily, global observations in near real-time, AIRS can play a role in applications that fall under many of the NASA Applied Sciences focus areas. AIRS' involvement in applications is two years in, so what have we learned and what are the pitfalls? AIRS has made gains in drought applications with products under consideration for inclusion in the U.S. Drought Monitor national map, as also with volcano rapid response with an internal alert system and automated products to help characterize plume extent. Efforts are underway with cold air aloft for aviation, influenza outbreak prediction, and vector borne disease. But challenges have occurred both in validation and in crossing the "valley of death" between products and decision makers. AIRS now has improved maps of standard products to be distributed in near real-time via NASA LANCE and by the Goddard DAAC as part of the Obama's administration Big Earth Data Initiative. In addition internal tools have been developed to support development and distribution of our application products. This talk will communicate the status of the AIRS applications effort along with lessons learned, and provide examples of new product imagery designed to best communicate AIRS data.

  10. Fast, Affordable, Science and Technology Satellite (FASTSAT) Huntsville-01 (HSV-01) Spacecraft Lessons Learned Report

    NASA Technical Reports Server (NTRS)

    Smith, Timothy A.

    2012-01-01

    The Fast Affordable Science and Technology Satellite (FASTSAT) project is a path finding effort to produce reliable satellite busses for different applications at an unprecedented speed and low cost. The project is designed to be a generational project and the first satellite produced is the Huntsville -01 (HSV-01) spacecraft. The subject of this report is the lessons learned gained during the development, testing, and up to the delivery of the FASTSAT HSV -01 spacecraft. The purpose of this report is to capture the major findings that will greatly benefit the future FASTSAT satellites and perhaps other projects interested in pushing the boundaries for cost and schedule. The FASTSAT HSV -01 primary objectives, success criteria, and team partners are summarized to give a frame of reference to the lessons learned.

  11. Lessons Learned (3 Years of H2O2 Propulsion System Testing Efforts at NASA's John C. Stennis Space Center)

    NASA Technical Reports Server (NTRS)

    Taylor, Gary O.

    2001-01-01

    John C. Stennis Space Center continues to support the Propulsion community in an effort to validate High-Test Peroxide as an alternative to existing/future oxidizers. This continued volume of peroxide test/handling activity at Stennis Space Center (SSC) provides numerous opportunities for the SSC team to build upon previously documented 'lessons learned'. SSC shall continue to strive to document their experience and findings as H2O2 issues surface. This paper is intended to capture all significant peroxide issues that we have learned over the last three years. This data (lessons learned) has been formulated from practical handling, usage, storage, operations, and initial development/design of our systems/facility viewpoint. The paper is intended to be an information type tool and limited in technical rational; therefore, presenting the peroxide community with some issues to think about as the continued interest in peroxide evolves and more facilities/hardware are built. These lessons learned are intended to assist industry in mitigating problems and identifying potential pitfalls when dealing with the requirements for handling high-test peroxide.

  12. Rapid Spacecraft Development: Results and Lessons Learned

    NASA Technical Reports Server (NTRS)

    Watson, William A.

    2002-01-01

    The Rapid Spacecraft Development Office (RSDO) at NASA's Goddard Space Flight Center is responsible for the management and direction of a dynamic and versatile program for the definition, competition, and acquisition of multiple indefinite delivery and indefinite quantity contracts - resulting in a catalog of spacecraft buses. Five spacecraft delivery orders have been placed by the RSDO and one spacecraft has been launched. Numerous concept and design studies have been performed, most with the intent of leading to a future spacecraft acquisition. A collection of results and lessons learned is recorded to highlight management techniques, methods and processes employed in the conduct of spacecraft acquisition. Topics include working relationships under fixed price delivery orders, price and value, risk management, contingency reserves, and information restrictions.

  13. Mining Mathematics in Textbook Lessons

    ERIC Educational Resources Information Center

    Ronda, Erlina; Adler, Jill

    2017-01-01

    In this paper, we propose an analytic tool for describing the mathematics made available to learn in a "textbook lesson". The tool is an adaptation of the Mathematics Discourse in Instruction (MDI) analytic tool that we developed to analyze what is made available to learn in teachers' lessons. Our motivation to adapt the use of the MDI…

  14. Ballistic trauma: lessons learned from iraq and afghanistan.

    PubMed

    Shin, Emily H; Sabino, Jennifer M; Nanos, George P; Valerio, Ian L

    2015-02-01

    Management of upper extremity injuries secondary to ballistic and blast trauma can lead to challenging problems for the reconstructive surgeon. Given the recent conflicts in Iraq and Afghanistan, advancements in combat-casualty care, combined with a high-volume experience in the treatment of ballistic injuries, has led to continued advancements in the treatment of the severely injured upper extremity. There are several lessons learned that are translatable to civilian trauma centers and future conflicts. In this article, the authors provide an overview of the physics of ballistic injuries and principles in the management of such injuries through experience gained from military involvement in Iraq and Afghanistan.

  15. Space shuttle launch vehicle aerodynamic uncertainties: Lessons learned

    NASA Technical Reports Server (NTRS)

    Hamilton, J. T.

    1983-01-01

    The chronological development and evolution of an uncertainties model which defines the complex interdependency and interaction of the individual Space Shuttle element and component uncertainties for the launch vehicle are presented. Emphasis is placed on user requirements which dictated certain concessions, simplifications, and assumptions in the analytical model. The use of the uncertainty model in the vehicle design process and flight planning support is discussed. The terminology and justification associated with tolerances as opposed to variations are also presented. Comparisons of and conclusions drawn from flight minus predicted data and uncertainties are given. Lessons learned from the Space Shuttle program concerning aerodynamic uncertainties are examined.

  16. Ballistic Trauma: Lessons Learned from Iraq and Afghanistan

    PubMed Central

    Shin, Emily H.; Sabino, Jennifer M.; Nanos, George P.; Valerio, Ian L.

    2015-01-01

    Management of upper extremity injuries secondary to ballistic and blast trauma can lead to challenging problems for the reconstructive surgeon. Given the recent conflicts in Iraq and Afghanistan, advancements in combat-casualty care, combined with a high-volume experience in the treatment of ballistic injuries, has led to continued advancements in the treatment of the severely injured upper extremity. There are several lessons learned that are translatable to civilian trauma centers and future conflicts. In this article, the authors provide an overview of the physics of ballistic injuries and principles in the management of such injuries through experience gained from military involvement in Iraq and Afghanistan. PMID:25685099

  17. STGT program: Ada coding and architecture lessons learned

    NASA Technical Reports Server (NTRS)

    Usavage, Paul; Nagurney, Don

    1992-01-01

    STGT (Second TDRSS Ground Terminal) is currently halfway through the System Integration Test phase (Level 4 Testing). To date, many software architecture and Ada language issues have been encountered and solved. This paper, which is the transcript of a presentation at the 3 Dec. meeting, attempts to define these lessons plus others learned regarding software project management and risk management issues, training, performance, reuse, and reliability. Observations are included regarding the use of particular Ada coding constructs, software architecture trade-offs during the prototyping, development and testing stages of the project, and dangers inherent in parallel or concurrent systems, software, hardware, and operations engineering.

  18. 10 lessons learned by a misguided physician.

    PubMed

    Levin, Barry E

    2017-07-01

    It was a great and humbling honor to receive the 2016 Distinguished Career Award from my SSIB colleagues. This paper summarizes the major points of my DCA talk at the 2016 annual meeting. It is a reflection on my 50year medical and research career and 10 lessons I have learned over those years which might be of help to young investigators near the beginning of their own research careers. These lessons include: the value of being receptive to the opportunities provided you; how clinician-scientists can serve as critical role models for young investigators like me and a history of how my career developed as a result of their influence; the importance of carefully examining your own data, particularly when it doesn't agree with your preconceived ideas; the critical role that students, postdocs and PhD (and even veterinarian) colleagues can play in developing one's career; the likelihood that your career path will have many interesting twists and turns determined by changes in your own scientific interests and how rewarding various areas of research focus are to you; the importance of building a close-knit laboratory staff family; the fact that science and romance can mix. Finally, I offer 3 somewhat self-evident free pieces of advice for building and maintaining a rewarding career. Copyright © 2016 Elsevier Inc. All rights reserved.

  19. Lessons Learned on Implementing Fault Detection, Isolation, and Recovery (FDIR) in a Ground Launch Environment

    NASA Technical Reports Server (NTRS)

    Ferell, Bob; Lewis, Mark; Perotti, Jose; Oostdyk, Rebecca; Goerz, Jesse; Brown, Barbara

    2010-01-01

    This paper's main purpose is to detail issues and lessons learned regarding designing, integrating, and implementing Fault Detection Isolation and Recovery (FDIR) for Constellation Exploration Program (CxP) Ground Operations at Kennedy Space Center (KSC).

  20. Risk communication in the case of the Fukushima accident: Impact of communication and lessons to be learned.

    PubMed

    Perko, Tanja

    2016-10-01

    Risk communication about the Fukushima Daiichi nuclear power plant accident in 2011 was often not transparent, timely, clear, nor factually correct. However, lessons related to risk communication have been identified and some of them are already addressed in national and international communication programmes and strategies. The Fukushima accident may be seen as a practice scenario for risk communication with important lessons to be learned. As a result of risk communication failures during the accident, the world is now better prepared for communication related to nuclear emergencies than it was 5 years ago The present study discusses the impact of communication, as applied during the Fukushima accident, and the main lessons learned. It then identifies pathways for transparent, timely, clear and factually correct communication to be developed, practiced and applied in nuclear emergency communication before, during, and after nuclear accidents. Integr Environ Assess Manag 2016;12:683-686. © 2016 SETAC. © 2016 SETAC.

  1. Development and Implementation of a School-based Obesity Prevention Intervention: Lessons Learned from Community-Based Participatory Research

    PubMed Central

    Uyeda, Kimberly; Bogart, Laura M.; Hawes-Dawson, Jennifer; Schuster, Mark A.

    2010-01-01

    Background National, state, and local policies aim to change school environments to prevent child obesity. Community-based participatory research (CBPR) can be effective in translating public health policy into practice. Objectives We describe lessons learned from developing and pilot testing a middle school-based obesity prevention intervention using CBPR in Los Angeles, California. Methods We formed a community–academic partnership between the Los Angeles Unified School District (LAUSD) and the UCLA/RAND Center for Adolescent Health Promotion to identify community needs and priorities for addressing adolescent obesity and to develop and pilot test a school-based intervention. Lessons Learned Academic partners need to be well-versed in organizational structures and policies. Partnerships should be built on relationships of trust, shared vision, and mutual capacity building, with genuine community engagement at multiple levels. Conclusion These lessons are critical, not only for partnering with schools on obesity prevention, but also for working in other community settings and on other health issues. PMID:20208226

  2. Open Distance Learning for Development: Lessons from Strengthening Research Capacity on Gender, Crisis Prevention, and Recovery

    ERIC Educational Resources Information Center

    Babu, Suresh Chandra; Ferguson, Jenna; Parsai, Nilam; Almoguera, Rose

    2013-01-01

    This paper documents the experience and lessons from implementing an e-learning program aimed at creating research capacity for gender, crisis prevention, and recovery. It presents a case study of bringing together a multidisciplinary group of women professionals through both online and face-to-face interactions to learn the skills needed to be a…

  3. Lessons learned in detailed clinical modeling at Intermountain Healthcare

    PubMed Central

    Oniki, Thomas A; Coyle, Joseph F; Parker, Craig G; Huff, Stanley M

    2014-01-01

    Background and objective Intermountain Healthcare has a long history of using coded terminology and detailed clinical models (DCMs) to govern storage of clinical data to facilitate decision support and semantic interoperability. The latest iteration of DCMs at Intermountain is called the clinical element model (CEM). We describe the lessons learned from our CEM efforts with regard to subjective decisions a modeler frequently needs to make in creating a CEM. We present insights and guidelines, but also describe situations in which use cases conflict with the guidelines. We propose strategies that can help reconcile the conflicts. The hope is that these lessons will be helpful to others who are developing and maintaining DCMs in order to promote sharing and interoperability. Methods We have used the Clinical Element Modeling Language (CEML) to author approximately 5000 CEMs. Results Based on our experience, we have formulated guidelines to lead our modelers through the subjective decisions they need to make when authoring models. Reported here are guidelines regarding precoordination/postcoordination, dividing content between the model and the terminology, modeling logical attributes, and creating iso-semantic models. We place our lessons in context, exploring the potential benefits of an implementation layer, an iso-semantic modeling framework, and ontologic technologies. Conclusions We assert that detailed clinical models can advance interoperability and sharing, and that our guidelines, an implementation layer, and an iso-semantic framework will support our progress toward that goal. PMID:24993546

  4. Conservation Learning in Wildlife Tourism Settings: Lessons from Research in Zoos and Aquariums

    ERIC Educational Resources Information Center

    Ballantyne, Roy; Packer, Jan; Hughes, Karen; Dierking, Lynn

    2007-01-01

    Zoos and aquariums have shifted their focus over recent years, taking a much more active role in wildlife conservation and in promoting conservation learning among their visitors. Research in these settings provides a valuable foundation for the emerging field of non-captive wildlife tourism. In particular, valuable lessons regarding the potential…

  5. Lessons Learned from the USAID Girls' Education Activity in Guatemala, Morocco, and Peru.

    ERIC Educational Resources Information Center

    Rugh, Andrea; Brush, Lorelei

    The Girls' Education Activity (GEA) is a project of the United States Agency for International Development's (USAID's) Office of Women in Development (WID) in the Bureau for Economic Growth, Agriculture and Trade. This report summarizes the experiences and lessons learned from 12 project initiatives in the 3 participating countries (Guatemala,…

  6. Looking within and beyond the community: lessons learned by researching, theorising and acting to address urban poverty and health.

    PubMed

    Hodgetts, Darrin; Chamberlain, Kerry; Tankel, Yadena; Groot, Shiloh

    2014-01-01

    Urban poverty and health inequalities are inextricably intertwined. By working in partnership with service providers and communities to address urban poverty, we can enhance the wellness of people in need. This article reflects on lessons learned from the Family100 project that explores the everyday lives, frustrations and dilemmas faced by 100 families living in poverty in Auckland. Lessons learned support the need to bring the experiences and lived realities of families to the fore in public deliberations about community and societal responses to urban poverty and health inequality.

  7. Operational Lessons Learned from the Ares I-X Flight Test

    NASA Technical Reports Server (NTRS)

    Davis, Stephan R.

    2010-01-01

    The Ares I-X flight test, launched in 2009, is the first test of the Ares I crew launch vehicle. This development flight test evaluated the flight dynamics, roll control, and separation events, but also provided early insights into logistical, stacking, launch, and recovery operations for Ares I. Operational lessons will be especially important for NASA as the agency makes the transition from the Space Shuttle to the Constellation Program, which is designed to be less labor-intensive. The mission team itself comprised only 700 individuals over the life of the project compared to the thousands involved in Shuttle and Apollo missions; while missions to and beyond low-Earth orbit obviously will require additional personnel, this lean approach will serve as a model for future Constellation missions. To prepare for Ares I-X, vehicle stacking and launch infrastructure had to be modified at Kennedy Space Center's Vehicle Assembly Building (VAB) as well as Launch Complex (LC) 39B. In the VAB, several platforms and other structures designed for the Shuttle s configuration had to be removed to accommodate the in-line, much taller Ares I-X. Vehicle preparation activities resulted in delays, but also in lessons learned for ground operations personnel, including hardware deliveries, cable routing, transferred work and custodial paperwork. Ares I-X also proved to be a resource challenge, as individuals and ground service equipment (GSE) supporting the mission also were required for Shuttle or Atlas V operations at LC 40/41 at Cape Canaveral Air Force Station. At LC 39B, several Shuttle-specific access arms were removed and others were added to accommodate the in-line Ares vehicle. Ground command, control, and communication (GC3) hardware was incorporated into the Mobile Launcher Platform (MLP). The lightning protection system at LC 39B was replaced by a trio of 600-foot-tall towers connected by a catenary wire to account for the much greater height of the vehicle. Like Shuttle

  8. Top 10 Lessons Learned from Electronic Medical Record Implementation in a Large Academic Medical Center.

    PubMed

    Rizer, Milisa K; Kaufman, Beth; Sieck, Cynthia J; Hefner, Jennifer L; McAlearney, Ann Scheck

    2015-01-01

    Electronic medical record (EMR) implementation efforts face many challenges, including individual and organizational barriers and concerns about loss of productivity during the process. These issues may be particularly complex in large and diverse settings with multiple specialties providing inpatient and outpatient care. This case report provides an example of a successful EMR implementation that emphasizes the importance of flexibility and adaptability on the part of the implementation team. It also presents the top 10 lessons learned from this EMR implementation in a large midwestern academic medical center. Included are five overarching lessons related to leadership, initial approach, training, support, and optimization as well as five lessons related to the EMR system itself that are particularly important elements of a successful implementation.

  9. Top 10 Lessons Learned from Electronic Medical Record Implementation in a Large Academic Medical Center

    PubMed Central

    Rizer, Milisa K.; Kaufman, Beth; Sieck, Cynthia J.; Hefner, Jennifer L.; McAlearney, Ann Scheck

    2015-01-01

    Electronic medical record (EMR) implementation efforts face many challenges, including individual and organizational barriers and concerns about loss of productivity during the process. These issues may be particularly complex in large and diverse settings with multiple specialties providing inpatient and outpatient care. This case report provides an example of a successful EMR implementation that emphasizes the importance of flexibility and adaptability on the part of the implementation team. It also presents the top 10 lessons learned from this EMR implementation in a large midwestern academic medical center. Included are five overarching lessons related to leadership, initial approach, training, support, and optimization as well as five lessons related to the EMR system itself that are particularly important elements of a successful implementation. PMID:26396558

  10. Experiences and lessons learned for delivery of micronutrient powders interventions.

    PubMed

    Reerink, Ietje; Namaste, Sorrel Ml; Poonawala, Alia; Nyhus Dhillon, Christina; Aburto, Nancy; Chaudhery, Deepika; Kroeun, Hou; Griffiths, Marcia; Haque, Mohammad Raisul; Bonvecchio, Anabelle; Jefferds, Maria Elena; Rawat, Rahul

    2017-09-01

    An effective delivery strategy coupled with relevant social and behaviour change communication (SBCC) have been identified as central to the implementation of micronutrient powders (MNP) interventions, but there has been limited documentation of what works. Under the auspices of "The Micronutrient Powders Consultation: Lessons Learned for Operational Guidance," three working groups were formed to summarize experiences and lessons across countries regarding MNP interventions for young children. This paper focuses on programmatic experiences related to MNP delivery (models, platforms, and channels), SBCC, and training. Methods included a review of published and grey literature, interviews with key informants, and deliberations throughout the consultation process. We found that most countries distributed MNP free of charge via the health sector, although distribution through other platforms and using subsidized fee for product or mixed payment models have also been used. Community-based distribution channels have generally shown higher coverage and when part of an infant and young child feeding approach, may provide additional benefit given their complementarity. SBCC for MNP has worked best when focused on meeting the MNP behavioural objectives (appropriate use, intake adherence, and related infant and young child feeding behaviours). Programmers have learned that reincorporating SBCC and training throughout the intervention life cycle has allowed for much needed adaptations. Diverse experiences delivering MNP exist, and although no one-size-fits-all approach emerged, well-established delivery platforms, community involvement, and SBCC-centred designs tended to have more success. Much still needs to be learned on MNP delivery, and we propose a set of implementation research questions that require further investigation. © 2017 The Authors. Maternal and Child Nutrition Published by John Wiley & Sons, Ltd.

  11. Lessons from school: what nurse leaders can learn from education.

    PubMed

    Davies, Nigel

    2015-07-01

    The drive to improve quality in the education sector is similar to that in health care, and lessons from the schools system are relevant to nursing leadership. This article discusses these shared traits, and details how school improvement was achieved in London and how a model of learning-centred leadership helped to transform pupil attainment in schools that had been performing poorly. Parallels are drawn between the education inspection system undertaken by Ofsted and the hospital inspections undertaken by the Care Quality Commission, and between the practice discipline-based managerial roles of nurse directors and head teachers. The article suggests that a learning-centred approach to improving the quality of patient care is needed, with a focus on the education and continuing professional development of staff.

  12. User observations on information sharing (corporate knowledge and lessons learned)

    NASA Technical Reports Server (NTRS)

    Montague, Ronald A.; Gregg, Lawrence A.; Martin, Shirley A.; Underwood, Leroy H.; Mcgee, John M.

    1993-01-01

    The sharing of 'corporate knowledge' and lessons learned in the NASA aerospace community has been identified by Johnson Space Center survey participants as a desirable tool. The concept of the program is based on creating a user friendly information system that will allow engineers, scientists, and managers at all working levels to share their information and experiences with other users irrespective of location or organization. The survey addresses potential end uses for such a system and offers some guidance on the development of subsequent processes to ensure the integrity of the information shared. This system concept will promote sharing of information between NASA centers, between NASA and its contractors, between NASA and other government agencies, and perhaps between NASA and institutions of higher learning.

  13. Comparisons of Field Tests with Simulations: Abrams Program Lessons Learned

    DTIC Science & Technology

    1990-03-01

    observed field out conme. Thiirtv-.-ixI\\ (3(-) of thle com parisons resulted in complete iuj .muatchves: thatif -. S ~u,-VSII inever )in its J000...2.REPORT DAE j3 EOTTP ~ AE OEE IMairch 1990 I-Final Jul 87 - Oct 89 4. TitE AND SUBTMTE S . PUNOING NUMBWERS (Comparisons or Field Tests with...Simulations: Abrams Program Lessons Learned 6. AUTHOR( S ) lPaul 11. lDcvtz, Jill I[. Smith. John 11. Stickling 7. PERFORMING ORGANIZATION NAME( S ) AND AIDDRESS

  14. Veggie Hardware Validation Test Preliminary Results and Lessons Learned

    NASA Technical Reports Server (NTRS)

    Massa, Gioia D.; Dufour, Nicole F.; Smith, T. M.

    2014-01-01

    The Veggie hardware validation test, VEG-01, was conducted on the International Space Station during Expeditions 39 and 40 from May through June of 2014. The Veggie hardware and the VEG-01 experiment payload were launched to station aboard the SpaceX-3 resupply mission in April, 2014. Veggie was installed in an Expedite-the-Processing-of-Experiments-to-Space-Station (ExPRESS) rack in the Columbus module, and the VEG-01 validation test was initiated. Veggie installation was successful, and power was supplied to the unit. The hardware was programmed and the root mat reservoir and plant pillows were installed without issue. As expected, a small amount of growth media was observed in the sealed bags which enclosed the plant pillows when they were destowed. Astronaut Steve Swanson used the wet/dry vacuum to clean up the escaped particles. Water insertion or priming the first plant pillow was unsuccessful as an issue prevented water movement through the quick disconnect. All subsequent pillows were successfully primed, and the initial pillow was replaced with a backup pillow and successfully primed. Six pillows were primed, but only five pillows had plants which germinated. After about a week and a half it was observed that plants were not growing well and that pillow wicks were dry. This indicated that the reservoir was not supplying sufficient water to the pillows via wicking, and so the team reverted to an operational fix which added water directly to the plant pillows. Direct watering of the pillows led to a recovery in several of the stressed plants; a couple of which did not recover. An important lesson learned involved Veggie's bellows. The bellows tended to float and interfere with operations when opened, so Steve secured them to the baseplate during plant tending operations. Due to the perceived intensity of the LED lights, the crew found it challenging to both work under the lights and read crew procedures on their computer. Although the lights are not a safety

  15. M-learning in a geography lesson

    NASA Astrophysics Data System (ADS)

    Mirski, Katri

    2014-05-01

    their work in Google Earth where they did a tour of their journey. In the feedback students said that it was a very interesting and an educational practical task. A new opportunity in M-learning is to use QR codes. This means that you don't have to print out worksheets with questions. You can hide question in the code and students can read them with their own devices on site. From the Master's thesis I also developed a tutorial material named "M-learning in a geography lesson" (in Estonian: M-õpe geograafiatunnis), you can see it in the webpage katrimope@wordpress.com. The tutorial received a second place on the Estonian study material contest in 2013. This is only one example on how to use M-learning. In Gustav Adolf Grammar School we use M-learning in lots of different subjects because it's really important in modern school to link new technologies, surrounding environment and learning for the purpose of better obtainment of knowledge.

  16. Supporting Teachers Learning Through the Collaborative Design of Technology-Enhanced Science Lessons

    NASA Astrophysics Data System (ADS)

    Kafyulilo, Ayoub C.; Fisser, Petra; Voogt, Joke

    2015-12-01

    This study used the Interconnected Model of Professional Growth (Clarke & Hollingsworth in Teaching and Teacher Education, 18, 947-967, 2002) to unravel how science teachers' technology integration knowledge and skills developed in a professional development arrangement. The professional development arrangement used Technological Pedagogical Content Knowledge as a conceptual framework and included collaborative design of technology-enhanced science lessons, implementation of the lessons and reflection on outcomes. Support to facilitate the process was offered in the form of collaboration guidelines, online learning materials, exemplary lessons and the availability of an expert. Twenty teachers participated in the intervention. Pre- and post-intervention results showed improvements in teachers' perceived and demonstrated knowledge and skills in integrating technology in science teaching. Collaboration guidelines helped the teams to understand the design process, while exemplary materials provided a picture of the product they had to design. The availability of relevant online materials simplified the design process. The expert was important in providing technological and pedagogical support during design and implementation, and reflected with teachers on how to cope with problems met during implementation.

  17. The Purposeful Classroom: How to Structure Lessons with Learning Goals in Mind

    ERIC Educational Resources Information Center

    Frey, Nancy; Fisher, Douglas

    2011-01-01

    One of the best ways to make sure the spirit of accountability is reflected in your teaching practice is to make sure everything you do in the classroom relates to a specific learning outcome. ASCD best-selling authors Doug Fisher and Nancy Frey explain exactly how to do that and take you through all the steps of making sure every lesson plan has…

  18. ATLAS Beam Steering Mechanism Lessons Learned

    NASA Technical Reports Server (NTRS)

    Blumenstock, Kenneth A.; Cramer, Alexander K.; Gostin, Alan B.; Hakun, Claef F.; Haney, Paul G.; Hinkle, Matthew R.; Lee, Kenneth Y.; Lugo, Carlos F.; Matuszeski, Adam J.; Morrell, Armando; hide

    2016-01-01

    This paper describes the design, testing, and lessons learned during the development of the Advanced Topographic Laser Altimeter System (ATLAS) Beam Steering Mechanism (BSM). The BSM is a 2 degree-of-freedom tip-tilt mechanism for the purpose of pointing a flat mirror to tightly control the co-alignment of the transmitted laser and the receiver telescope of the ATLAS instrument. The high resolution needs of the mission resulted in sub-arcsecond pointing and knowledge requirements, which have been met. Development of the methodology to verify performance required significant effort. The BSM will fly as part of the Ice, Cloud, and Elevation Satellite II Mission (ICESat II), which is scheduled to be launched in 2017. The ICESat II primary mission is to map the earth's surface topography for the determination of seasonal changes of ice sheet thickness and vegetation canopy thickness to establish long-term trends.

  19. Lessons Learned with Metallized Gelled Propellants

    NASA Technical Reports Server (NTRS)

    1996-01-01

    During testing of metallized gelled propellants in a rocket engine, many changes had to be made to the normal test program for traditional liquid propellants. The lessons learned during the testing and the solutions for many of the new operational conditions posed with gelled fuels will help future programs run more smoothly. The major factors that influenced the success of the testing were propellant settling, piston-cylinder tank operation, control of self pressurization, capture of metal oxide particles, and a gelled-fuel protective layer. In these ongoing rocket combustion experiments at the NASA Lewis Research Center, metallized, gelled liquid propellants are used in a small modular engine that produces 30 to 40 lb of thrust. Traditional liquid RP-1 and gelled RP-1 with 0-, 5-, and 55-wt% loadings of aluminum are used with gaseous oxygen as the oxidizer. The figure compares the thrust chamber efficiencies of different engines.

  20. A Telepresence Learning Environment for Opera Singing: Distance Lessons Implementations over Internet2

    ERIC Educational Resources Information Center

    Alpiste Penalba, Francisco; Rojas-Rajs, Teresa; Lorente, Pedro; Iglesias, Francisco; Fernández, Joaquín; Monguet, Josep

    2013-01-01

    The Opera eLearning project developed a solution for opera singing distance lessons at the graduate level, using high bandwidth to deliver a quality audio and video experience that has been evaluated by singing teachers, chorus and orchestra directors, singers and other professional musicians. Prior to finding a technological model that suits the…

  1. Aviation Safety Risk Modeling: Lessons Learned From Multiple Knowledge Elicitation Sessions

    NASA Technical Reports Server (NTRS)

    Luxhoj, J. T.; Ancel, E.; Green, L. L.; Shih, A. T.; Jones, S. M.; Reveley, M. S.

    2014-01-01

    Aviation safety risk modeling has elements of both art and science. In a complex domain, such as the National Airspace System (NAS), it is essential that knowledge elicitation (KE) sessions with domain experts be performed to facilitate the making of plausible inferences about the possible impacts of future technologies and procedures. This study discusses lessons learned throughout the multiple KE sessions held with domain experts to construct probabilistic safety risk models for a Loss of Control Accident Framework (LOCAF), FLightdeck Automation Problems (FLAP), and Runway Incursion (RI) mishap scenarios. The intent of these safety risk models is to support a portfolio analysis of NASA's Aviation Safety Program (AvSP). These models use the flexible, probabilistic approach of Bayesian Belief Networks (BBNs) and influence diagrams to model the complex interactions of aviation system risk factors. Each KE session had a different set of experts with diverse expertise, such as pilot, air traffic controller, certification, and/or human factors knowledge that was elicited to construct a composite, systems-level risk model. There were numerous "lessons learned" from these KE sessions that deal with behavioral aggregation, conditional probability modeling, object-oriented construction, interpretation of the safety risk results, and model verification/validation that are presented in this paper.

  2. Lessons learned during the successful eradication of bovine tuberculosis from Australia

    PubMed Central

    More, S. J.; Radunz, B.; Glanville, R. J.

    2015-01-01

    There are very few international examples of the successful eradication of bovine tuberculosis (TB, caused by infection with Mycobacterium bovis) from a national cattle population. This paper presents a brief overview of the successful TB eradication programme in Australia from 1970, with primary emphasis on lessons of international relevance that were learned from the Australian experience. The national brucellosis and tuberculosis eradication campaign ran for 27 years from 1970 to 1997 and has been followed by ongoing abattoir surveillance. Rapid progress towards eradication was made in southern Australia, but proved much more challenging in extensive pastoral areas of northern Australia. Declaration of TB freedom was made on December 31, 1997. A range of factors were critical to this success, including a compelling rationale for eradication, an agreed final outcome, industry commitment and financial support, a business model for programme planning, implementation and review, consistent and transparent technical standards underpinned by a strict regulatory regime and applied research, the critical role of abattoir surveillance, effective elimination of residual infection and objective measures of programme progress. Although direct translation of some of these experiences may not be possible, many of the lessons learned from the Australian experience may be relevant to other countries. PMID:26338937

  3. The Effect of Cooperative Learning Method and Systematic Teaching on Students' Achievement and Retention of Knowledge in Social Studies Lesson

    ERIC Educational Resources Information Center

    Korkmaz Toklucu, Selma; Tay, Bayram

    2016-01-01

    Problem Statement: Many effective instructional strategies, methods, and techniques, which were developed in accordance with constructivist approach, can be used together in social studies lessons. Constructivist education comprises active learning processes. Two active learning approaches are cooperative learning and systematic teaching. Purpose…

  4. Developing Noticing of Reasoning through Demonstration Lessons

    ERIC Educational Resources Information Center

    Bragg, Leicha A.; Vale, Colleen

    2014-01-01

    Observation of fellow educators conducting demonstration lessons is one avenue for teachers to develop sensitivity to noticing students' reasoning. We examined teachers' noticing of children's learning behaviours in one demonstration lesson of the "Mathematical Reasoning Professional Learning Research Program" (MRPLRP). The observations…

  5. Lessons Learned from Applying Design Thinking in a NASA Rapid Design Study in Aeronautics

    NASA Technical Reports Server (NTRS)

    McGowan, Anna-Maria; Bakula, Casey; Castner, Raymond

    2017-01-01

    In late 2015, NASA's Aeronautics Research Mission Directorate (ARMD) funded an experiment in rapid design and rapid teaming to explore new approaches to solving challenging design problems in aeronautics in an effort to cultivate and foster innovation. This report summarizes several lessons learned from the rapid design portion of the study. This effort entailed learning and applying design thinking, a human-centered design approach, to complete the conceptual design for an open-ended design challenge within six months. The design challenge focused on creating a capability to advance experimental testing of autonomous aeronautics systems, an area of great interest to NASA, the US government as a whole, and an entire ecosystem of users and developers around the globe. A team of nine civil servant researchers from three of NASA's aeronautics field centers with backgrounds in several disciplines was assembled and rapidly trained in design thinking under the guidance of the innovation and design firm IDEO. The design thinking process, while used extensively outside the aerospace industry, is less common and even counter to many practices within the aerospace industry. In this report, several contrasts between common aerospace research and development practices and design thinking are discussed, drawing upon the lessons learned from the NASA rapid design study. The lessons discussed included working towards a design solution without a set of detailed design requirements, which may not be practical or even feasible for management to ascertain for complex, challenging problems. This approach allowed for the possibility of redesigning the original problem statement to better meet the needs of the users. Another lesson learned was to approach problems holistically from the perspective of the needs of individuals that may be affected by advances in topic area instead of purely from a technological feasibility viewpoint. The interdisciplinary nature of the design team also

  6. Data Standardization for Carbon Cycle Modeling: Lessons Learned

    NASA Astrophysics Data System (ADS)

    Wei, Y.; Liu, S.; Cook, R. B.; Post, W. M.; Huntzinger, D. N.; Schwalm, C.; Schaefer, K. M.; Jacobson, A. R.; Michalak, A. M.

    2012-12-01

    Terrestrial biogeochemistry modeling is a crucial component of carbon cycle research and provides unique capabilities to understand terrestrial ecosystems. The Multi-scale Synthesis and Terrestrial Model Intercomparison Project (MsTMIP) aims to identify key differences in model formulation that drive observed differences in model predictions of biospheric carbon exchange. To do so, the MsTMIP framework provides standardized prescribed environmental driver data and a standard model protocol to facilitate comparisons of modeling results from nearly 30 teams. Model performance is then evaluated against a variety of carbon-cycle related observations (remote sensing, atmospheric, and flux tower-based observations) using quantitative performance measures and metrics in an integrated evaluation framework. As part of this effort, we have harmonized highly diverse and heterogeneous environmental driver data, model outputs, and observational benchmark data sets to facilitate use and analysis by the MsTMIP team. In this presentation, we will describe the lessons learned from this data-intensive carbon cycle research. The data harmonization activity itself can be made more efficient with the consideration of proper tools, version control, workflow management, and collaboration within the whole team. The adoption of on-demand and interoperable protocols (e.g. OPeNDAP and Open Geospatial Consortium) makes data visualization and distribution more flexible. Users can customize and download data in specific spatial extent, temporal period, and different resolutions. The effort to properly organize data in an open and standard format (e.g. Climate & Forecast compatible netCDF) allows the data to be analysed by a dispersed set of researchers more efficiently, and maximizes the longevity and utilization of the data. The lessons learned from this specific experience can benefit efforts by the broader community to leverage diverse data resources more efficiently in scientific research.

  7. Human Systems Integration in Practice: Constellation Lessons Learned

    NASA Technical Reports Server (NTRS)

    Zumbado, Jennifer Rochlis

    2012-01-01

    NASA's Constellation program provided a unique testbed for Human Systems Integration (HSI) as a fundamental element of the Systems Engineering process. Constellation was the first major program to have HSI mandated by NASA's Human Rating document. Proper HSI is critical to the success of any project that relies on humans to function as operators, maintainers, or controllers of a system. HSI improves mission, system and human performance, significantly reduces lifecycle costs, lowers risk and minimizes re-design. Successful HSI begins with sufficient project schedule dedicated to the generation of human systems requirements, but is by no means solely a requirements management process. A top-down systems engineering process that recognizes throughout the organization, human factors as a technical discipline equal to traditional engineering disciplines with authority for the overall system. This partners with a bottoms-up mechanism for human-centered design and technical issue resolution. The Constellation Human Systems Integration Group (HSIG) was a part of the Systems Engineering and Integration (SE&I) organization within the program office, and existed alongside similar groups such as Flight Performance, Environments & Constraints, and Integrated Loads, Structures and Mechanisms. While the HSIG successfully managed, via influence leadership, a down-and-in Community of Practice to facilitate technical integration and issue resolution, it lacked parallel top-down authority to drive integrated design. This presentation will discuss how HSI was applied to Constellation, the lessons learned and best practices it revealed, and recommendations to future NASA program and project managers. This presentation will discuss how Human Systems Integration (HSI) was applied to NASA's Constellation program, the lessons learned and best practices it revealed, and recommendations to future NASA program and project managers on how to accomplish this critical function.

  8. Ebola Virus Epidemic in West Africa: Global Health Economic Challenges, Lessons Learned, and Policy Recommendations.

    PubMed

    Elmahdawy, Mahmoud; Elsisi, Gihan H; Carapinha, Joao; Lamorde, Mohamed; Habib, Abdulrazaq; Agyie-Baffour, Peter; Soualmi, Redouane; Ragab, Samah; Udezi, Anthony W; Usifoh, Cyril; Usifoh, Stella

    2017-09-01

    The Ebola virus has spread across several Western Africa countries, adding a significant financial burden to their health systems and economies. In this article the experience with Ebola is reviewed, and economic challenges and policy recommendations are discussed to help curb the impact of other diseases in the future. The West African Ebola virus disease epidemic started in resource-constrained settings and caused thousands of fatalities during the last epidemic. Nevertheless, given population mobility, international travel, and an increasingly globalized economy, it has the potential to re-occur and evolve into a global pandemic. Struggling health systems in West African countries hinder the ability to reduce the causes and effects of the Ebola epidemic. The lessons learned include the need for strengthening health systems, mainly primary care systems, expedited access to treatments and vaccines to treat the Ebola virus disease, guidance on safety, efficacy, and regulatory standards for such treatments, and ensuring that research and development efforts are directed toward existing needs. Other lessons include adopting policies that allow for better flow of relief, averting the adverse impact of strong quarantine policy that includes exaggerating the aversion behavior by alarming trade and business partners providing financial support to strengthen growth in the affected fragile economies by the Ebola outbreak. Curbing the impact of future Ebola epidemics, or comparable diseases, requires increased long-term investments in health system strengthening, better collaboration between different international organizations, more funding for research and development efforts aimed at developing vaccines and treatments, and tools to detect, treat, and prevent future epidemics. Copyright © 2017. Published by Elsevier Inc.

  9. Lessons Learned for Space Safety from the Fukushima Nuclear Power Plant Accident

    NASA Astrophysics Data System (ADS)

    Nogami, Manami; Miki, Masami; Mitsui, Masami; Kawada, Ysuhiro; Takeuchi, Nobuo

    2013-09-01

    On March 11 2011, Tohoku Region Pacific Coast Earthquake hit Japan and caused the devastating damage. The Fukushima Nuclear Power Station (NPS) was also severely damaged.The Japanese NPSs are designed based on the detailed safety requirements and have multiple-folds of hazard controls to the catastrophic hazards as in space system. However, according to the initial information from the Tokyo Electric Power Company (TEPCO) and the Japanese government, the larger-than-expected tsunami and subsequent events lost the all hazard controls to the release of radioactive materials.At the 5th IAASS, Lessons Learned from this disaster was reported [1] mainly based on the "Report of the Japanese Government to the IAEA Ministerial Conference on Nuclear Safety" [2] published by Nuclear Emergency Response Headquarters in June 2011, three months after the earthquake.Up to 2012 summer, the major investigation boards, including the Japanese Diet, the Japanese Cabinet and TEPCO, published their final reports, in which detailed causes of this accident and several recommendations are assessed from each perspective.In this paper, the authors examine to introduce the lessons learned to be applied to the space safety as findings from these reports.

  10. Recruitment and retention of rural African Americans in diabetes research: lessons learned.

    PubMed

    Loftin, Wanda Anderson; Barnett, Steven K; Bunn, Peggy Summers; Sullivan, Patra

    2005-01-01

    The purpose of this article was to describe lessons learned about recruitment and retention of rural African Americans from published literature, the authors' research, and research experience. Two rural, community-based research studies with African Americans with diabetes are used to illustrate different issues and strategies in recruitment and retention. Relevant MEDLINE articles and clinical studies were reviewed, and the design, implementation, and results of the 2 community-based studies were evaluated. Information from the literature, research results, and sample selection, participation, and attrition experiences were synthesized to determine effective approaches for recruitment and retention. Research funding, design, and implementation; recruitment methods; culturally competent approaches; caring, trusting provider-patient relationships; incentives; follow-up; and factors in the rural environment emerged as important issues influencing recruitment and retention. Recruitment and retention of African Americans in rural diabetes research is a significant challenge, and adequate funding should be sought early in the research process. Culturally competent approaches; caring, trusting relationships; incentives; and follow-up are important concepts in successful recruitment, participation, and retention of African Americans. The lessons learned may be applicable to the more widespread issue of recruitment and retention of rural African Americans in diabetes education programs.

  11. Japanese Lesson Study Comes to California

    ERIC Educational Resources Information Center

    Jetter, Madeleine; Hancock, Gwen

    2012-01-01

    Japanese lesson study--Jugyou kenkyuu--which is a cornerstone of Project DELTA (Developing Educators Learning to Teach Algebraically), adds a new twist: the teachers take turns publicly teaching the collaboratively planned lessons with their own students for the rest of the team to observe and then analyze, based on the students' learning. Lesson…

  12. Stardust-next : Lessons Learned from a Comet Flyby Mission

    NASA Technical Reports Server (NTRS)

    Wolf, Aron A.; Larson, Timothy; Thompson, Paul; McElrath, Timothy; Bhaskaran, Shyam; Chesley, Steven; Klaasen, Kenneth P.; Cheuvront, Allan

    2012-01-01

    The Stardust-NExT (New Exploration of Tempel) mission, a follow-on to the Stardust prime mission, successfully completed a flyby of comet Tempel-1 on 2/14/11. However there were many challenges along the way, most significantly low propellant margin and detection of the comet in imagery later than antici-pated. These challenges and their ramifications forced the project to respond with flexibility and ingenuity. As a result, the flyby at an altitude of 178 km was nearly flawless, accomplishing all its science objectives. Lessons learned on Stardust-NExT may have relevance to other spacecraft missions.

  13. Partial Testing Can Potentiate Learning of Tested and Untested Material from Multimedia Lessons

    ERIC Educational Resources Information Center

    Yue, Carole L.; Soderstrom, Nicholas C.; Bjork, Elizabeth Ligon

    2015-01-01

    Test-potentiated learning occurs when testing renders a subsequent study period more effective than it would have been without an intervening test. We examined whether testing only a subset of material from a multimedia lesson would potentiate the restudy of both tested and untested material. In Experiments 1a and 1b, participants studied a…

  14. Local markets for global health technologies: lessons learned from advancing 6 new products.

    PubMed

    Matthias, Dipika Mathur; Taylor, Catharine H; Sen, Debjeet; Metzler, Mutsumi

    2014-05-01

    Key components to support local institutional and consumer markets are: supply chain, finance, clinical use, and consumer use. Key lessons learned: (1) Build supply and demand simultaneously. (2) Support a lead organization to drive the introduction process. (3) Plan for scale up from the start. (4) Profitability for the private sector is an absolute.

  15. Lessons Learned from School Crises and Emergencies. Volume 1, Issue 1, Fall 2006

    ERIC Educational Resources Information Center

    US Department of Education, 2006

    2006-01-01

    This issue of "Lessons Learned" addresses "Dealing with Weapons on Campus." Each year, school administrators, faculty and staff must deal with the possibility of students planning and carrying out pranks such as toilet-papering trees, egging automobiles or spray painting school property. These high jinks often occur at the end of the school year,…

  16. First External Evaluations of Quality Assurance Agencies--Lessons Learned. ENQA Workshop Report 10

    ERIC Educational Resources Information Center

    Costes, Nathalie; Curvale, Bruno; Kraft, Michael G.; Llavori, Rafael; Malan, Thierry; Szanto, Tibor

    2010-01-01

    This report is a product of an ENQA (European Association for Quality Assurance in Higher Education) seminar on the first external evaluations of quality assurance agencies, held in Paris in July 2008. The seminar took stock of the achieved reviews of agencies to learn lessons from these first outcomes and, hence, provided a platform for…

  17. Zika Virus Emergence and Expansion: Lessons Learned from Dengue and Chikungunya May Not Provide All the Answers

    PubMed Central

    Christofferson, Rebecca C.

    2016-01-01

    Following the emergence of Zika in the past decade, there are lessons to be learned from similar emergence events of dengue (DENV) and chikungunya (CHIKV). Specifically, as Zika emerges in the Americas there is a natural tendency to apply the knowledge base of DENV and CHIKV to mitigation and control of a virus with such a similar transmission system. However, there are marked differences that may preclude such broad stroke application of this knowledge base without making potentially faulty assumptions. Herein, Zika virus (ZIKV) transmission is reviewed, and the commonalities among these three arboviruses are discussed. Importantly, the divergence of this particular arbovirus is discussed, as is the need to develop ZIKV-specific knowledge base for mitigation of this disease. Specifically reviewed are 1) emergence and persistence patterns, 2) genetic and phenotypic diversity, 3) vector host range, and finally, 4) alternate transmission routes and added complexity of ZIKV transmission and presentation. PMID:26903610

  18. Learning from Experience, Volume 3: Lessons from the United Kingdom’s Astute Submarine Program

    DTIC Science & Technology

    2011-01-01

    Learning from Experience, Volume III what had been installed and led to significant additional, unplanned hours for rework. Although VSEL and GEC Marconi...sions, although many can fall into multiple categorizations. In this chapter, we first describe lessons learned at the strategic level. We go on to...That is, if certain operational goals are beyond the state of current technology, what operations can existing technologies support? This relates to

  19. The final days of Solar Max - Lessons learned from engineering evaluation tests

    NASA Technical Reports Server (NTRS)

    Donnelly, Michael L.; Croft, John W.; Ward, David K.; Thames, Michael A.

    1990-01-01

    End-of-life engineering evaluation tests were performed on Solar Max between October and November 1989. The tests included four-wheel control law operation; reaction wheel rundowns; modular power subsystem standard power regulator unit voltage-temperature level tests; battery rundown/2nd plateau determination; high gain antenna retraction and jettison; and solar array jettison. This paper presents these tests, their results, and the lessons learned from them.

  20. Health Communications in Rural America: Lessons Learned from an Arthritis Campaign in Rural Arkansas

    ERIC Educational Resources Information Center

    Balamurugan, Appathurai; Rivera, Mark; Sutphin, Kim; Campbell, Debbie

    2007-01-01

    Context: Lack of awareness about diseases and associated risk factors could partially account for some rural health disparities. Health communications campaigns can be an effective means of increasing awareness in these areas. Purpose: To review findings and lessons learned from a rural health communications campaign. Methods: The health…

  1. Learning lessons from Natech accidents - the eNATECH accident database

    NASA Astrophysics Data System (ADS)

    Krausmann, Elisabeth; Girgin, Serkan

    2016-04-01

    When natural hazards impact industrial facilities that house or process hazardous materials, fires, explosions and toxic releases can occur. This type of accident is commonly referred to as Natech accident. In order to prevent the recurrence of accidents or to better mitigate their consequences, lessons-learned type studies using available accident data are usually carried out. Through post-accident analysis, conclusions can be drawn on the most common damage and failure modes and hazmat release paths, particularly vulnerable storage and process equipment, and the hazardous materials most commonly involved in these types of accidents. These analyses also lend themselves to identifying technical and organisational risk-reduction measures that require improvement or are missing. Industrial accident databases are commonly used for retrieving sets of Natech accident case histories for further analysis. These databases contain accident data from the open literature, government authorities or in-company sources. The quality of reported information is not uniform and exhibits different levels of detail and accuracy. This is due to the difficulty of finding qualified information sources, especially in situations where accident reporting by the industry or by authorities is not compulsory, e.g. when spill quantities are below the reporting threshold. Data collection has then to rely on voluntary record keeping often by non-experts. The level of detail is particularly non-uniform for Natech accident data depending on whether the consequences of the Natech event were major or minor, and whether comprehensive information was available for reporting. In addition to the reporting bias towards high-consequence events, industrial accident databases frequently lack information on the severity of the triggering natural hazard, as well as on failure modes that led to the hazmat release. This makes it difficult to reconstruct the dynamics of the accident and renders the development of

  2. Value-Based Requirements Traceability: Lessons Learned

    NASA Astrophysics Data System (ADS)

    Egyed, Alexander; Grünbacher, Paul; Heindl, Matthias; Biffl, Stefan

    Traceability from requirements to code is mandated by numerous software development standards. These standards, however, are not explicit about the appropriate level of quality of trace links. From a technical perspective, trace quality should meet the needs of the intended trace utilizations. Unfortunately, long-term trace utilizations are typically unknown at the time of trace acquisition which represents a dilemma for many companies. This chapter suggests ways to balance the cost and benefits of requirements traceability. We present data from three case studies demonstrating that trace acquisition requires broad coverage but can tolerate imprecision. With this trade-off our lessons learned suggest a traceability strategy that (1) provides trace links more quickly, (2) refines trace links according to user-defined value considerations, and (3) supports the later refinement of trace links in case the initial value consideration has changed over time. The scope of our work considers the entire life cycle of traceability instead of just the creation of trace links.

  3. Outcomes and lessons learned from evaluating TRICARE's disease management programs.

    PubMed

    Dall, Timothy M; Askarinam Wagner, Rachel C; Zhang, Yiduo; Yang, Wenya; Arday, David R; Gantt, Cynthia J

    2010-06-01

    To share outcomes and lessons learned from an evaluation of disease management (DM) programs for asthma, congestive heart failure (CHF), and diabetes for TRICARE patients. Multiyear evaluation of participants in voluntary, opt-out DM programs. Patient-centered programs, administered by 3 regional contractors, provide phone-based consultations with a care manager, educational materials, and newsletters. The study sample consisted of 23,793 asthma, 4092 CHF, and 29,604 diabetes patients with at least 6 months' tenure in the program. Medical claims were analyzed to quantify program effect on healthcare utilization, medical costs, and clinical outcomes. Multivariate regression analysis with an historical control group was used to predict patient outcomes in the absence of DM. The difference between actual and predicted DM patient outcomes was attributed to the program. A patient survey collected data on program satisfaction and perceived usefulness of program information and services. Modest improvements in patient outcomes included reduced inpatient days and medical costs, and (with few exceptions) increased percentages of patients receiving appropriate medications and tests. Annual per patient reductions in medical costs were $453, $371, and $783 for asthma, CHF, and diabetes program participants, respectively. The estimated return on investment was $1.26 per $1.00 spent on DM services. Findings suggest that the DM programs more than pay for themselves, in addition to improving patient health and quality of life. Lessons learned in program design, implementation, effectiveness, and evaluation may benefit employers contemplating DM, DM providers, and evaluators of DM programs.

  4. Bhopal: lessons learned

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Greenly, G.D. Jr.

    1986-03-01

    The risk assessment lesson learned from the Bhopal tragedy is both simple and complex. Practical planning for toxic material releases must start with an understanding of what the risks and possible consequences are. Additionally, plans must be formulated to ensure immediate decisive actions tailored to site specific scenarios, and the possible impacts projected on both the plant and surrounding communities. Most importantly, the planning process must include the communities that could be affected. Such planning will ultimately provide significant financial savings and provide for good public relations, and this makes good business sense in both developed and developing countries. Paraphrasingmore » the adage ''a penny saved is a penny earned,'' a penny spent on emergency preparedness is dollars earned through public awareness. The complex aspect of these simple concepts is overcoming human inertia, i.e., overcoming the ''it can't happen here'' syndrome in both government and private industry. A world center of excellence (ITRAC), acting as a center for education, research, and development in the area of emergency planning and response, will be the conduit for needed technology transfer to national centers of excellence in emergency planning and response. These national emergency planning and response centers (NARACS), managed by private industry for governments, will be catalysts to action in formulating effective plans involving potentially affected communities and plant management. The ITRAC/NARAC proposal is a simple concept involving complex ideas to solve the simple problem of being prepared for the Bhopal-like emergency which, as experience has demonstrated, will have complex consequences for the unprepared.« less

  5. Flipped Learning, MOOCs and Learning Analytics: Lessons learnt from a Web Map Design course redesign

    NASA Astrophysics Data System (ADS)

    Treves, R.

    2013-12-01

    Five weeks content of a 12 week course in web map design were converted to 'flipped learning': Lecture sessions were replaced by online short video lectures and multiple choice questions to be completed outside class. Class time was taken up with activities and exercises linked to the online learning. Students use of the online content was carefully tracked and detailed student feedback gathered. The response from students was good, 90% of them completed all the out of class activities and their feedback was very positive. The format has the advantage of being easily repurposed as a MOOC or scaled up in other ways. Lessons learnt from the implementation of the materials and the analysis of the VLE logs will be discussed as will ongoing efforts to reuse the materials in a MOOC.

  6. Implementing the Japanese Problem-Solving Lesson Structure

    ERIC Educational Resources Information Center

    Groves, Susie

    2013-01-01

    While there has been worldwide interest in Japanese Lesson Study as a model for teacher professional learning, there has been less research into authentic implementation of the problem-solving lesson structure that underpins mathematics research lessons in Japan. Findings from a Lesson Study project involving teachers from three Victorian primary…

  7. Assistant practitioners: lessons learned from licensed practical nurses.

    PubMed

    Whittingham, Katrina

    The role of the assistant practitioner (AP) needs to be defined so they have clear career pathways and opportunities for professional development. The author sought to learn from other countries where a sustained effort had been made to support practitioners fulfilling this intermediate role. The equivalent of an AP in Canada is the licensed practical nurse (LPN); LPNs are subject to clear regulation and practice within their remit of their license. The author travelled to Alberta, Canada, and performed a qualitative study to investigate the role of the LPN. LPNs undertake a 2-year diploma-level course and have the opportunity to enhance their careers through specialist courses or to train as a RN. LPNs benefit from careful regulation, enabling them to have a clear scope of practice, a career structure with opportunities for development and consistent ethical standards. Lessons can be learned from the LPN model and put in practice in the UK; APs need a consistent education programme, a career pathway that promotes development and effective regulation.

  8. Space Mechanisms Lessons Learned Study. Volume 1: Summary

    NASA Technical Reports Server (NTRS)

    Shapiro, Wilbur; Murray, Frank; Howarth, Roy; Fusaro, Robert

    1995-01-01

    Hundreds of satellites have been launched to date. Some have operated extremely well and others have not. In order to learn from past operating experiences, a study was conducted to determine the conditions under which space mechanisms (mechanically moving components) have previously worked or failed. The study consisted of: (1) an extensive literature review that included both government contractor reports and technical journals; (2) communication and visits (when necessary) to the various NASA and DOD centers and their designated contractors (this included contact with project managers of current and prior NASA satellite programs as well as their industry counterparts); (3) requests for unpublished information to NASA and industry; and (4) a mail survey designed to acquire specific mechanism experience. The information obtained has been organized into two volumes. Volume 1 provides a summary of the lessons learned, the results of a needs analysis, responses to the mail survey, a listing of experts, a description of some available facilities and a compilation of references. Volume 2 contains a compilation of the literature review synopsis.

  9. Preliminary Lessons Learned from the “Native Navigators and the Cancer Continuum” (NNACC)

    PubMed Central

    Krebs, Linda U.; Watanabe-Galloway, Shinobu; Petereit, Daniel G.; Pingatore, Noel L.; Eschiti, Valerie

    2012-01-01

    This community-based participatory research (CBPR) study was based on patient navigation (Navigator) among three original sites: Colorado, Michigan, and South Dakota. During 2010, the study added two sites: the Comanche Nation and the Muscogee (Creek) Nation (Oklahoma). The intervention includes 24-h of a Navigator-implemented cancer education program that addresses the full continuum of cancer care. The partners include agreements with up to two local Native American organizations each year, called Memorandum Native Organizations, who have strong relationships with local American Indians. Family fun events are used to initiate the series of workshops and to collect baseline data and also to wrap up and evaluate the series 3 months following the completion of the workshop series. Evaluation data are collected using an audience response system (ARS) and stored using an online evaluation program. Among the lessons learned to date are: the Institutional Review Board processes required both regional and national approvals and took more than 9 months. All of the workshop slides were missing some components and needed refinements. The specifics for the Memorandum Native Organization deliverables needed more details. The ARS required additional training sessions, but once learned the Navigator use the ARS well. Use of the NACR website for a password-protected page to store all NNACC workshop and training materials was easier to manage than use of other online storage programs. The community interest in taking part in the workshops was greater than what was anticipated. All of the Navigators’ skills are improving and all are enjoying working with the community. PMID:22410710

  10. Epidemiologic methods lessons learned from environmental public health disasters: Chernobyl, the World Trade Center, Bhopal, and Graniteville, South Carolina.

    PubMed

    Svendsen, Erik R; Runkle, Jennifer R; Dhara, Venkata Ramana; Lin, Shao; Naboka, Marina; Mousseau, Timothy A; Bennett, Charles

    2012-08-01

    Environmental public health disasters involving hazardous contaminants may have devastating effects. While much is known about their immediate devastation, far less is known about long-term impacts of these disasters. Extensive latent and chronic long-term public health effects may occur. Careful evaluation of contaminant exposures and long-term health outcomes within the constraints imposed by limited financial resources is essential. Here, we review epidemiologic methods lessons learned from conducting long-term evaluations of four environmental public health disasters involving hazardous contaminants at Chernobyl, the World Trade Center, Bhopal, and Graniteville (South Carolina, USA). We found several lessons learned which have direct implications for the on-going disaster recovery work following the Fukushima radiation disaster or for future disasters. These lessons should prove useful in understanding and mitigating latent health effects that may result from the nuclear reactor accident in Japan or future environmental public health disasters.

  11. Lessons Learned From 104 Years of Mobile Observatories

    NASA Astrophysics Data System (ADS)

    Miller, S. P.; Clark, P. D.; Neiswender, C.; Raymond, L.; Rioux, M.; Norton, C.; Detrick, R.; Helly, J.; Sutton, D.; Weatherford, J.

    2007-12-01

    As the oceanographic community ventures into a new era of integrated observatories, it may be helpful to look back on the era of "mobile observatories" to see what Cyberinfrastructure lessons might be learned. For example, SIO has been operating research vessels for 104 years, supporting a wide range of disciplines: marine geology and geophysics, physical oceanography, geochemistry, biology, seismology, ecology, fisheries, and acoustics. In the last 6 years progress has been made with diverse data types, formats and media, resulting in a fully-searchable online SIOExplorer Digital Library of more than 800 cruises (http://SIOExplorer.ucsd.edu). Public access to SIOExplorer is considerable, with 795,351 files (206 GB) downloaded last year. During the last 3 years the efforts have been extended to WHOI, with a "Multi-Institution Testbed for Scalable Digital Archiving" funded by the Library of Congress and NSF (IIS 0455998). The project has created a prototype digital library of data from both institutions, including cruises, Alvin submersible dives, and ROVs. In the process, the team encountered technical and cultural issues that will be facing the observatory community in the near future. Technological Lessons Learned: Shipboard data from multiple institutions are extraordinarily diverse, and provide a good training ground for observatories. Data are gathered from a wide range of authorities, laboratories, servers and media, with little documentation. Conflicting versions exist, generated by alternative processes. Domain- and institution-specific issues were addressed during initial staging. Data files were categorized and metadata harvested with automated procedures. With our second-generation approach to staging, we achieve higher levels of automation with greater use of controlled vocabularies. Database and XML- based procedures deal with the diversity of raw metadata values and map them to agreed-upon standard values, in collaboration with the Marine Metadata

  12. Formation of Community-Based Hypertension Practice Networks: Success, Obstacles, and Lessons Learned

    PubMed Central

    Dart, Richard A.; Egan, Brent M.

    2014-01-01

    Community-based practice networks for research and improving the quality of care are growing in size and number but have variable success rates. In this paper we review recent efforts to initiate a community-based hypertension network modeled after the successful Outpatient Quality Improvement Network (O’QUIN) project, located at the Medical University of South Carolina. We highlight key lessons learned and new directions to be explored. PMID:24666425

  13. EOS MLS Lessons Learned: Design Ideas for Safer and Lower Cost Operations

    NASA Technical Reports Server (NTRS)

    Miller, Dominick

    2012-01-01

    The Earth Observing System (EOS) Microwave Limb Sounder (MLS) is a complex instrument with a front end computer and 32 subsystem computers. MLS is one of four instruments on NASA's EOS Aura spacecraft With almost 8 years in orbit, MLS has a few lessons learned which can be applied during the design phase of future instruments to effect better longevity, more robust operations and a significant cost benefit during operations phase.

  14. 78 FR 64202 - Meeting To Discuss Lessons Learned From Commerce Spectrum Management Advisory Committee Working...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-28

    ....'' \\2\\ \\2\\ Memorandum for Heads of Executive Departments and Agencies, Expanding America's Leadership in...-leadership-wireless-innovatio . Matters To Be Considered: At this meeting, NTIA will facilitate a forum for the CSMAC Working Group participants to discuss lessons learned from the collaborative efforts within...

  15. Integrating Grid Services into the Cray XT4 Environment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NERSC; Cholia, Shreyas; Lin, Hwa-Chun Wendy

    2009-05-01

    The 38640 core Cray XT4"Franklin" system at the National Energy Research Scientific Computing Center (NERSC) is a massively parallel resource available to Department of Energy researchers that also provides on-demand grid computing to the Open Science Grid. The integration of grid services on Franklin presented various challenges, including fundamental differences between the interactive and compute nodes, a stripped down compute-node operating system without dynamic library support, a shared-root environment and idiosyncratic application launching. Inour work, we describe how we resolved these challenges on a running, general-purpose production system to provide on-demand compute, storage, accounting and monitoring services through generic gridmore » interfaces that mask the underlying system-specific details for the end user.« less

  16. Building a quality culture in the Office of Space Flight: Approach, lessons learned and implications for the future

    NASA Technical Reports Server (NTRS)

    Roberts, C. Shannon

    1992-01-01

    The purpose of this paper is to describe the approach and lessons learned by the Office of Space Flight (OSF), National Aeronautics and Space Administration (NASA), in its introduction of quality. In particular, the experience of OSF Headquarters is discussed as an example of an organization within NASA that is considering both the business and human elements of the change and the opportunities the quality focus presents to improve continuously. It is hoped that the insights shared will be of use to those embarking upon similar cultural changes. The paper is presented in the following parts: the leadership challenge; background; context of the approach to quality; initial steps; current initiatives; lessons learned; and implications for the future.

  17. Building a quality culture in the Office of Space Flight: Approach, lessons learned and implications for the future

    NASA Astrophysics Data System (ADS)

    Roberts, C. Shannon

    The purpose of this paper is to describe the approach and lessons learned by the Office of Space Flight (OSF), National Aeronautics and Space Administration (NASA), in its introduction of quality. In particular, the experience of OSF Headquarters is discussed as an example of an organization within NASA that is considering both the business and human elements of the change and the opportunities the quality focus presents to improve continuously. It is hoped that the insights shared will be of use to those embarking upon similar cultural changes. The paper is presented in the following parts: the leadership challenge; background; context of the approach to quality; initial steps; current initiatives; lessons learned; and implications for the future.

  18. Project LEAN--lessons learned from a national social marketing campaign.

    PubMed Central

    Samuels, S E

    1993-01-01

    The Henry J. Kaiser Family Foundation initiated a social marketing campaign in 1987 to reduce the nation's risk for heart disease and some cancers. Consensus on recommendations for dietary change have stimulated the development of a variety of social marketing campaigns to promote behavior change. Project LEAN (Low-Fat Eating for America Now) is a national campaign whose goal is to reduce dietary fat consumption to 30 percent of total calories through public service advertising, publicity, and point-of-purchase programs in restaurants, supermarkets, and school and worksite cafeterias. The public service advertising reached 50 percent of the television viewing audience and the print publicity, more than 35 million readers. The toll-free hotline received more than 300,000 calls. Thirty-four organizations joined the foundation in partnership and raised $350,000 for collaborative activities. Thirteen States implemented local campaigns. Lessons have been learned about the use of the media, market segmentation, effective spokespersons, and successful partnerships. These lessons will be valuable to others planning social marketing campaigns on nutrition and other preventive behaviors. Images p48-a PMID:8434097

  19. Project LEAN--lessons learned from a national social marketing campaign.

    PubMed

    Samuels, S E

    1993-01-01

    The Henry J. Kaiser Family Foundation initiated a social marketing campaign in 1987 to reduce the nation's risk for heart disease and some cancers. Consensus on recommendations for dietary change have stimulated the development of a variety of social marketing campaigns to promote behavior change. Project LEAN (Low-Fat Eating for America Now) is a national campaign whose goal is to reduce dietary fat consumption to 30 percent of total calories through public service advertising, publicity, and point-of-purchase programs in restaurants, supermarkets, and school and worksite cafeterias. The public service advertising reached 50 percent of the television viewing audience and the print publicity, more than 35 million readers. The toll-free hotline received more than 300,000 calls. Thirty-four organizations joined the foundation in partnership and raised $350,000 for collaborative activities. Thirteen States implemented local campaigns. Lessons have been learned about the use of the media, market segmentation, effective spokespersons, and successful partnerships. These lessons will be valuable to others planning social marketing campaigns on nutrition and other preventive behaviors.

  20. Prototyping with Application Generators: Lessons Learned from the Naval Aviation Logistics Command Management Information System Case

    DTIC Science & Technology

    1992-10-01

    Prototyping with Application Generators: Lessons Learned from the Naval Aviation Logistics Command Management Information System Case. This study... management information system to automate manual Naval aviation maintenance tasks-NALCOMIS. With the use of a fourth-generation programming language